Loading...
HomeMy WebLinkAboutC_Secondary Review Letter_171212_v1 December 14, 2017 Yoshio Piediscalzi, P.E. DR Strong Consulting Engineers Inc. 620 7th Ave Kirkland, WA 98033 SUBJECT: Otak Secondary Wetlands Study Cedar at the Highlands, LUA17-000189 Dear Mr. Piediscalzi: The Planning Division of the City of Renton accepted the above master application for review on April 25, 2017. The application was put on hold on May 10, 2017 and taken off hold on August 2, 2017. The application was put on-hold again on August 17th, 2017 due to continuing inconsistencies within the submitted wetland report prepared by Sewall Wetland Consulting. In order to gather additional information on the wetlands, Otak, Inc was hired prepare a secondary wetlands report. On December 11, 2017, Otak submitted a new report, dated December 6, 2017, to the Current Planning Project Manager (enclosed with this letter). The report contains findings and analysis based on a November 20, 2017 site visit completed by Otak staff. The report concludes that the original wetlands categorization in the report submitted by Sewall Wetland Consulting was calculated in correctly. At this time, your project will remain “on hold” pending receipt of a response to the secondary review report prepared by Otak. Please contact me at (425) 430-7219 if you have any questions. Sincerely, Alex Morganroth Associate Planner Enclosure(s): Otak Report cc: Gerald Smith, Owner(s) Jamie Waltier, Harbor Homes, LLC Richard Claypole, Party of Record