Loading...
HomeMy WebLinkAboutSR_HEX_Report_Exhibits_LUA18000082_180327DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Project Location Map SR_HEXReport_SunsetMultiService_LUA18000127_180320 A. REPORT TO THE HEARING EXAMINER HEARING DATE: March 27, 2018 Project Name: Sunset Multi-Service & Career Development Center Owner/Applicant: Mark Gropper, Renton Housing Authority, 2900 NE 10th Street, Renton, WA 98056 Contact: Grace Kim, Schemata Workshop, 1720 12th Ave, Seattle, WA 98122 Project File Number: PR18000082 Land Use File Number: LUA18-000127, CU-H Project Manager: Matt Herrera, Senior Planner Project Summary: The applicant is requesting a Hearing Examiner Conditional Use Permit approval to locate the proposed Sunset Multi-Service and Career Development Center in the former Highlands Library building. The subject property is located at 2902 NE 12th St and was recently purchased from the City by the Renton Housing Authority (RHA). The existing 6,160 square foot building is located on a 1.4 acre lot. No exterior site construction improvements or building additions are proposed. Proposed interior improvements would support multiple services such as job training assistance, ESL adult education classes, and potentially a foodbank. While the property is owned by the RHA, the regional non-profit Neighborhood House would manage the proposed service center. Access to the site will remain in the existing locations along NE 12th St. The subject property contains 26 parking spaces. Project Location: 2902 NE 12th St. Site Area: 1.4 acres City of Renton Department of Community & Economic Development Hearing Examiner Recommendation SUNSET MULTI-SERVICE CENTER LUA18-000127,CU-H Report of March 27, 2018 Page 2 of 12 SR_HEXReport_SunsetMultiService_LUA18000127_180320 B. EXHIBITS: Exhibit 1: Staff Report to the Hearing Examiner Exhibit 2: Environmental Review Committee Memorandum Exhibit 3: Sunset Area Community Environmental Impact Statement Exhibit 4: Sunset Area Planned Action Ordinance Exhibit 5 Site Plan Exhibit 6: Floor Plan Exhibit 7: Trip Generation and Assessment prepared by Heath and Associates, dated February 2018 Exhibit 8: Concurrency Test Memorandum prepared by Brianne Bannwarth, Development Engineering Manager, dated March 2, 2018 Exhibit 9: Exterior Elevations Exhibit 10: Landscape Memorandum prepared by Nakano Associates, dated February 9, 2018 Exhibit 11: Advisory Notes to Applicant C. GENERAL INFORMATION: 1. Owner(s) of Record: Mark Gropper, Renton Housing Authority, 2900 NE 10th St, Renton, WA 98056 2. Zoning Classification: Residential – 14 (R-14) 3. Comprehensive Plan Land Use Designation: Residential High Density 4. Existing Site Use: Vacant – Former Highlands Library 5. Critical Areas: Wellhead Protection Area – Zone 2 6. Neighborhood Characteristics: a. North: Attached Housing/Duplexes – R-14 b. East: Attached Housing/Duplexes – R-14 c. South: Attached Housing/Flats – Center Village (CV) d. West: Attached Housing/Duplexes – R-14 6. Site Area: 1.4 acres D. HISTORICAL/BACKGROUND: Action Land Use File No. Ordinance No. Date Comprehensive Plan N/A 5758 06/22/2015 Zoning N/A 5758 06/22/2015 Epstein Annexation N/A 1246 04/16/1946 Old Library Short Plat LUA16-000960 03/1/2017 Sunset Area Planned Action EIS LUA10-052 N/A 06/06/2011 City of Renton Department of Community & Economic Development Hearing Examiner Recommendation SUNSET MULTI-SERVICE CENTER LUA18-000127,CU-H Report of March 27, 2018 Page 3 of 12 SR_HEXReport_SunsetMultiService_LUA18000127_180320 Planned Action Ordinance (Amended) N/A 5813 12/8/2014 E. PUBLIC SERVICES: 1. Existing Utilities a. Water: Water service will be provided by the City of Renton. There is an existing 8-inch water main located in NE 12th St. The existing building is served by an existing 1-1/2” domestic water service and 1-1/2” irrigation water service. b. Sewer: Sewer service is provided by the City of Renton. There is an existing eight-inch PVC gravity sewer main located in NE 12th St. c. Surface/Storm Water: There are stormwater mains located in NE 12th St. Runoff from the existing site includes one existing building and associated parking lot where no stormwater infrastructure currently exists on-site. 2. Streets: NE 12th Street is a Collector Street with an existing right of way (ROW) width of 50-feet per the King County Assessor’s Map. There is currently a five-foot wide sidewalk fronting the project site. 3. Fire Protection: Renton Regional Fire Authority F. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE: 1. Chapter 2 Land Use Districts a. Section 4-2-020: Purpose and Intent of Zoning Districts b. Section 4-2-070: Zoning Use Table c. Section 4-2-110: Residential Development Standards 2. Chapter 3 Environmental Regulations a. Section 4-3-050: Critical Area Regulations 3. Chapter 4 City-Wide Property Development Standards 4. Chapter 8 Permits – General and Appeals 5. Chapter 9 Permits – Specific a. Section 4-9-030: Conditional Use Permits 6. Chapter 11 Definitions G. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN: 1. Land Use Element 2. Housing and Human Services 3. Economic Development H. FINDINGS OF FACT (FOF): 1. The Planning Division of the City of Renton accepted the above master application for review on February 16, 2018 and determined the application complete on February 22, 2018. The project complies with the 120-day review period. City of Renton Department of Community & Economic Development Hearing Examiner Recommendation SUNSET MULTI-SERVICE CENTER LUA18-000127,CU-H Report of March 27, 2018 Page 4 of 12 SR_HEXReport_SunsetMultiService_LUA18000127_180320 2. The project site is located at 2902 NE 12th Street. The site was recently subdivided to separate the mid- block alley portion of the property that extended to Harrington Ave NE. 3. The project site is the former Highlands Library which contains the existing 6,160 square foot building, landscaping, and parking spaces for 26 vehicles. The library operated in this building from 1973 to 2016. 4. Access to the site would not change as the two existing driveways located on the east and west perimeter of the property abutting NE 12th Street would be utilized. 5. The property is located within the Residential High Density Comprehensive Plan land use designation. 6. The site is located within the Residential – 14 (R-14) zoning classification. 7. The site is located within the boundaries of the Sunset Area Planned Action Study Area and environmental review was conducted as part of the Sunset Area Planned Action EIS. 8. The City’s Environmental Review Committee has determined the proposal meets the criteria of the Planned Action Ordinance and qualifies as a planned action; therefore no SEPA determination was required (Exhibits 1, 2, and 3). 9. There are approximately 39 trees located on site. No tree removal is proposed with the application. 10. The site is mapped with Wellhead Protection Area – Zone 2. 11. The applicant proposes no exterior construction on the site at this time. Proposed improvements would be interior to the building to support the new use. 12. The applicant is proposing to begin interior improvements to the building in April/May 2018. 13. Staff has received no public or agency comments prior to the issuance of this recommendation. 14. Representatives from various city departments have reviewed the application materials to identify and address issues raised by the proposed development. These comments are contained in the official file, and the essence of the comments has been incorporated into the appropriate sections of this report and the Departmental Recommendation at the end of this report. 15. Comprehensive Plan Compliance: The site is designated Residential High Density (HD) on the City’s Comprehensive Plan Map. The purpose of the MD designation is to allow both single-family and multi- family development and support cost-efficient housing that is near transit service. Projects in HD areas will be compatible with existing uses and where infrastructure is adequate to handle impacts from higher density uses. The proposal is compliant with the following development standards if all conditions of approval are met: Compliance Comprehensive Plan Analysis  Policy L-56: Preserve natural landforms, vegetation, distinctive stands of trees, natural slopes, and scenic areas that contribute to the City’s identity, preserve property values, and visually define the community and neighborhoods.  Policy L-61: Improve the appearance of parking lots through landscaping and screening.  Policy HHS-17: Work with community partners to support people who face barriers to getting and staying employed, need job training, and desire career advancement.  Policy ED-19: Support the Departments of Public Works and Community Services, the Department of Community and Economic Development Planning Division, and the Renton Housing Authority to encourage economic development strategies that address disparities in income and employment opportunities for economically disadvantaged populations, including minorities and women. City of Renton Department of Community & Economic Development Hearing Examiner Recommendation SUNSET MULTI-SERVICE CENTER LUA18-000127,CU-H Report of March 27, 2018 Page 5 of 12 SR_HEXReport_SunsetMultiService_LUA18000127_180320 16. Zoning Development Standard Compliance: The purpose of the Residential-14 Zone (R-14) is to encourage development, and redevelopment, of residential neighborhoods that provide a mix of detached and attached dwelling structures organized and designed to combine characteristics of both typical single family and small-scale multi-family developments. Structure size is intended to be limited in terms of bulk and scale so that the various unit types allowed in the zone are compatible with one another and can be integrated together into a quality neighborhood. Project features are encouraged, such as yards for private use, common open spaces, and landscaped areas that enhance a neighborhood and foster a sense of community. Civic and limited commercial uses may be allowed when they support the purpose of the designation. The proposal is compliant with the following development standards, as outlined in RMC 4-2-110A, if all conditions of approval are met: Compliance R-14 Zone Develop Standards and Analysis Compliant if CUP criteria are met, see FOF 18 Use: The applicant proposes a service and social organization use in the former Highlands Library building. The library moved to a new facility in 2016 and the City owned property was recently sold the Renton Housing Authority. The non-profit Neighborhood House will operate the proposed multi-service center. Staff Comment: Pursuant to RMC 4-2-060 Zoning Use Table, a service and social organization use may be located in an R-14 zone with Hearing Examiner Conditional Use Permit Approval. N/A Density: The density range permitted in the R-14 zone is a minimum 7.0 up to a maximum of 14.0 dwelling units per net acre. Net density is calculated after the deduction of sensitive areas, areas intended for public right-of-way, and private access easements. Staff Comment: Not applicable, no residential uses are proposed.  Lot Dimensions: The minimum lot size permitted in the R-14 zone is 3,000 sq. ft. for detached dwellings. There is no minimum lot size for attached dwellings. A minimum lot width of 30 feet is required (40 feet for corner lots) and a minimum lot depth of 60 feet is required. The following table identifies the existing lot size and dimensions: Lot Size (sq. ft.) Lot Width (feet) Lot Depth (feet) 61,133 200+ 300+ Staff Comment: The proposed use is not a dwelling however it meets minimum dimensional requirements.  Setbacks: The required setbacks in the R-14 zone are as follows: front yard is 15 feet except when all access is taken from an alley then 10 feet, side yard is 4 feet for detached units, for attached units the side yard is 0 feet for the attached sides and 4 feet for the unattached sides, secondary front yard (applies to corner lots) is 15 feet, and the rear yard is 10 feet. Staff Comment: The existing building is setback from NE 12th (front yard) approximately 110-feet. The closest side yard setback is approximately 21-feet on the northwest corner of the building. The rear yard setback is +100-feet.  Building Standards: The R-14 zone has a maximum building coverage of 65% and a maximum impervious surface coverage of 80%. In the R-14 zone, a maximum building height of 3 stories with a wall plate height of 24 feet is permitted. Roofs with a pitch equal to or greater than 4:12 may project an additional six (6) vertical feet from the City of Renton Department of Community & Economic Development Hearing Examiner Recommendation SUNSET MULTI-SERVICE CENTER LUA18-000127,CU-H Report of March 27, 2018 Page 6 of 12 SR_HEXReport_SunsetMultiService_LUA18000127_180320 maximum wall plate height. If the height of wall plates on a building are less than the states maximum the roof may project higher to account for the difference, yet the combined height of both features shall not exceed the combined maximums. Common rooftop features, such as chimneys, may project an additional four (4) vertical feet from the roof surface. Non-exempt vertical projections (e.g., roofs pitched less than 4:12, decks, railings, etc.) may extend up to six (6) vertical feet above the maximum wall plate height if the projection is stepped back one-and-a-half (1.5) horizontal feet from each minimum building setback line for each one (1) vertical foot above the maximum wall plate height. Wall plates supporting a primary roof surface that has only one (1) sloping plane (e.g., shed roof) may exceed the stated maximum if the average of wall plate heights is equal or less than the maximum wall plate height allowed. Staff Comment: The existing building coverage is approximately 10-percent and existing impervious surface coverage is approximately 25-percent. The existing building is single- story with a maximum overall roof height of approximately 18.5-feet (Exhibit 8). N/A Maximum Number of Units per Building: In the R-14 zone, no more than 6 units per building are permitted. Staff Comment: Not applicable, no residential uses are proposed. See FOF 18: Landscaping Landscaping: The City’s landscape regulations (RMC 4-4-070) require a 10-foot landscape strip along all public street frontages. Additional minimum planting strip widths between the curb and sidewalk are established according to the street development standards of RMC 4-6-060. Street trees and, at a minimum, groundcover, are to be located in this area when present. Spacing standards shall be as stipulated by the Department of Community and Economic Development, provided there shall be a minimum of one street tree planted per address. Any additional undeveloped right-of- way areas shall be landscaped unless otherwise determined by the Administrator. Where there is insufficient right-of-way space or no public frontage, street trees are required in the front yard subject to approval of the Administrator. A minimum of two trees are to be located in the front yard prior to final inspection for the new Single Family Residence. Staff Comment: The subject property contains a 17 to 19-foot wide landscaping strip with four mature Western Red Cedar trees approximately 50-feet in height. Existing mature landscaping is located along the perimeter of the subject property and in those areas not encumbered with the building footprint, parking lot, or pedestrian circulation. The applicant does not propose to remove any of the existing mature landscaping with the new multi-service center use. See FOF 18 Conditional Use Analysis: Landscaping for additional analysis and recommended condition of approval. N/A Tree Retention: The City’s adopted Tree Retention and Land Clearing Regulations (4-4- 130) require the retention of 20 percent of trees in a residential development. Significant trees shall be retained in the following priority order: Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees on slopes greater than twenty percent (20%); significant trees adjacent to critical areas and their associated buffers; and significant trees over sixty feet (60') in height or greater than eighteen inches ( 18") caliper. City of Renton Department of Community & Economic Development Hearing Examiner Recommendation SUNSET MULTI-SERVICE CENTER LUA18-000127,CU-H Report of March 27, 2018 Page 7 of 12 SR_HEXReport_SunsetMultiService_LUA18000127_180320 Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; other significant native evergreen or deciduous trees; and other significant non- native trees. Priority Three: Alders and cottonwoods shall be retained when all other trees have been evaluated for retention and are not able to be retained, unless the alders and/ or cottonwoods are used as part of an approved enhancement project within a critical area or its buffer. A minimum tree density shall be maintained on each residentially zoned lot. Lots developed with detached single family dwelling units in the R-14 zone are exempt from the minimum tree density requirements. For multi-family development, the minimum tree density is four (4) significant trees for every five thousand (5,000) square feet. The tree density may consist of existing trees, replacement trees, trees required pursuant to RMC 4-4-070F1, Street Frontage Landscaping Required, or a combination. Staff Comment: The applicant does not propose to remove any of the 39 trees located on the site. Further, no land development or routine vegetation management activities are proposed and therefore the RMC 4-4-130 is not applicable.  Parking: Service and social organizations is not an identified use in the City’s parking space quantity table set forth in RMC 4-4-08010.f.d. For those uses not specifically identified in the table, the code states that City staff shall determine which of the listed uses is most similar to the proposal and base the required number of spaces on that similar use. Driveway cuts are required to be a minimum of 5 feet from property lines and new driveways may be a maximum of 16 feet in width at the property line. Maximum driveway slopes shall not exceed fifteen percent (15%); provided, that driveways exceeding eight percent (8%) shall provide slotted drains at the lower end with positive drainage discharge to restrict runoff from entering the garage/residence or crossing any public sidewalk. Staff Comment: The site currently contains 26 parking spaces for the 6,160 square foot building or one space per approximately 237 square feet of gross floor area. The multi- service center includes services such as job training, ESL classes, and other adult education classes. The proposed floor plan (Exhibit 5) identifies spaces with cubicles, meeting rooms, receptionist space, and offices that are indicative of general office uses. There are also areas shown that are typical of learning spaces such as the computer lab and classrooms. The on-site services use specifically excludes service and social organizations from its definition even though this use may be similar to the proposal. Note that the existing parking capacity at the subject property exceeds the 3 spaces per 1,000 square feet of net floor area the parking space quantity table prescribes to the on- site services use. The RMC parking space table noted above requires general office uses to provide between 2 and 4.5 spaces per 1,000 square feet of net floor area. Vocational schools require one space per employee plus 0.5 spaces for every full-time student not residing on campus. The existing 26 parking spaces would provide adequate parking for a general office use or adult vocational instruction per the parking space quantity table and based on the following analysis. The general office use requires a range of between 2 and 4.5 parking spaces per 1,000 square feet of net floor area. The existing building contains 6,160 square feet of gross floor area. Using the gross floor calculation, the existing 26 space parking lot would City of Renton Department of Community & Economic Development Hearing Examiner Recommendation SUNSET MULTI-SERVICE CENTER LUA18-000127,CU-H Report of March 27, 2018 Page 8 of 12 SR_HEXReport_SunsetMultiService_LUA18000127_180320 provide approximately 4.2 parking spaces per 1,000 square feet of gross floor area (26 spaces / 6.16 = 4.22 spaces per 1,000sf). The vocational school use requires one parking space per employee and 0.5 spaces per student. The applicant’s trip generation and assessment report (Exhibit 6) identifies the facility will have 12 full time employees and up to 20 visitors to the site throughout the day. The existing 26 space parking lot would provide enough spaces for each of the 12 employees and 10 spaces for the visitors with four spaces available for overflow. The existing driveway cuts are setback greater than the minimum five-foot requirement and their respective slopes are less than eight percent. N/A Fences and Retaining Walls: In any residential district, the maximum height of any fence, hedge or retaining wall shall be seventy two inches (72"). Except in the front yard and side yard along a street setback where the fence shall not exceed forty eight inches (48") in height. There shall be a minimum three-foot landscaped setback at the base of retaining walls abutting public rights-of-way. Staff Comment: Not applicable, no fencing or retaining walls are proposed. Compliant if condition of approval is met Refuse and Recycling: In office, educational and institutional developments, a minimum of two (2) square feet per every one thousand (1,000) square feet of building gross floor area shall be provided for recyclables deposit areas and a minimum of four (4) square feet per one thousand (1,000) square feet of building gross floor area shall be provided for refuse deposit areas. A total minimum area of one hundred (100) square feet shall be provided for recycling and refuse deposit areas. Staff Comment: The applicant’s site plan (Exhibit 4) provides a noted space for a “Dumpster area” however no enclosure is shown or exists that meets the spatial and collection requirements such as minimum area and architectural design set forth in RMC 4-4-090. Therefore staff recommends as a condition of approval, the applicant submit a refuse and recycling screening detail with the building permit application. The screening detail shall be reviewed and approved by the Current Planning Project Manager prior to building permit issuance. 17. Critical Areas: Project sites which contain critical areas are required to comply with the Critical Areas Regulations (RMC 4-3-050). The proposal is consistent with the Critical Areas Regulations:  Wellhead Protection Areas: Staff Comment: A Wellhead Protection Area Zone 2 is mapped on the project site. The applicant is not proposing any site construction and therefore no fill will be brought to the site. Additionally, no hazardous material use or storage is anticipated with the proposed multi-service center. 18. Conditional Use Analysis: The applicant proposes to locate a service and social organization use within the R-14 zone. Pursuant to RMC 4-2-060, the proposal requires Hearing Examiner Conditional Use Permit approval to occupy the former Highlands Library building. The proposal is compliant with the following conditional use criteria, pursuant to RMC 4-9-030. Therefore, staff recommends approval of the requested Conditional Use Permit. City of Renton Department of Community & Economic Development Hearing Examiner Recommendation SUNSET MULTI-SERVICE CENTER LUA18-000127,CU-H Report of March 27, 2018 Page 9 of 12 SR_HEXReport_SunsetMultiService_LUA18000127_180320 Compliance Conditional Use Criteria and Analysis  a. Consistency with Plans and Regulations: The proposed use shall be compatible with the general goals, objectives, policies and standards of the Comprehensive Plan, the zoning regulations and any other plans, programs, maps or ordinances of the City of Renton. Staff Comment: The applicant states “The goal of the Sunset Multi-Service and Career Development Center is to provide job training, ESL classes, school readiness assistance, and other family assistance services to local low-income residents. That these services are proposed in what technically is a residential zone is not unusual. First, that the site served as a library for more than 40 years provides precedent for the proposed use at this location. Additionally, the Housing and Human Services element of the city’s Comprehensive Plan specifically integrates “Human Services goals and policies with Housing goals and policies, because housing and human service needs are often intertwined (page 36)”. Similarly, the description of the R-14 zone highlights the enhancement of a neighborhood and the fostering of a sense of community. Neighborhood House’s mission is literally to help build community.” Staff concurs the proposal is consistent with City plans and regulations. See FOF 15 for Comprehensive Plan and FOF 16 zoning regulation compliance.  b. Appropriate Location: The proposed location shall not result in the detrimental overconcentration of a particular use within the City or within the immediate area of the proposed use. The proposed location shall be suited for the proposed use. Staff Comment: The applicant states “The proposed location is nearly equal distance between McKnight Middle School and the commercial services available on NE Sunset Blvd. As the site of a former library, the proposed use can be seen simply as a continuation of a use that fosters a sense of community and focuses on the well-being and continued development of local residents.” Staff concurs that the proposed location will not result in an overconcentration of the proposed use. The proposed multi-service and career development center will be unique to the neighborhood. While the location is zoned R-14, the historic use of the site has been community oriented, which would continue on with an approved conditional use permit.  c. Effect on Adjacent Properties: The proposed use at the proposed location shall not result in substantial or undue adverse effects on adjacent property. Staff Comment: The applicant states “The existing building has already been part of the neighborhood for over 40 years. The minimal bulk of the one-story building fits the scale of the predominantly residential neighborhood. The proposed use will not change either the scale or the character of the building.” Staff concurs that no substantial or undue adverse effects on adjacent property would occur with the proposed multi-service and career development center. The Highlands Library utilized this space from 1973 to 2016. The continued community oriented use of the site would be consistent and analogous to the previous use. Repurposing the building will also provide activity and “eyes on the street” which has been absent since the relocation of the Highlands Library.  d. Compatibility: The proposed use shall be compatible with the scale and character of the neighborhood. City of Renton Department of Community & Economic Development Hearing Examiner Recommendation SUNSET MULTI-SERVICE CENTER LUA18-000127,CU-H Report of March 27, 2018 Page 10 of 12 SR_HEXReport_SunsetMultiService_LUA18000127_180320 Staff Comment: The applicant states “The existing building has already been part of the neighborhood for over 40 years. The minimal bulk of the one-story building fits the scale of the predominantly residential neighborhood. The proposed use will not change either the scale or the character of the building.” Staff concurs that the proposed use will be compatible with the scale and character of the neighborhood. No new construction or exterior building additions/improvements are proposed. Mature vegetation provides a buffer between the subject property and abutting high density residential properties. The existing one-story building has been a part of the neighborhood since 1973 and would continue as a community oriented use should the conditional use permit be approved.  e. Parking: Adequate parking is, or will be made, available. Staff Comment: The applicant contends the 26 stall parking lot is sufficient for the proposed use. Staff concurs that the existing parking lot would provide adequate capacity for the proposed multi-service and career development center. The existing parking lot contains approximately one parking space per 237 square feet of building square footage. While the City’s standards do not contain specific parking quantity requirements for service and social organization uses, the parking capacity contains adequate parking for similar uses such as on-site services, general office, and vocational education. See FOF 16 Zoning and Development Standards Compliance: Parking for analysis. Compliant if condition of approval is met f. Traffic: The use shall ensure safe movement for vehicles and pedestrians and shall mitigate potential effects on the surrounding area. Staff Comment: The applicant contends the proposed multi-service center will not generate more vehicular or pedestrian traffic than the former library. Staff concurs that the use will ensure safe movement for pedestrians and potential effects on the surrounding area with regard to vehicle trips would likely be less than the former library. Pedestrian access to the site is provided via a delineated concrete pathway from the public sidewalk on NE 12th St to the building’s entrance. The concrete pathway abuts the eastern driveway and is separated via curb from the parking lot. As provided in the applicant’s Trip Generation and Assessment Report (Exhibit 6), average daily trips to the site would decrease by 264 trips. The proposal also passed the City’s Concurrency Test (Exhibit 7) which considers such factors as the citywide transportation plan and trip capacity within allowed growth levels. The existing access to the site contains two relatively narrow driveways approximately 12-13 feet in width that bookend the property frontage. A one-way traffic pattern was used for the former library and the site plan (Exhibit 4) provides for the same pattern. The ingress driveway is located on the eastern edge of the property with traffic movements in a westerly direction to the egress driveway on the western frontage. The former library provided directional signage at the ingress and egress driveways that notified drivers of the one-way nature of the onsite circulation pattern. Those signs have since been removed with facility’s relocation. Therefore, staff recommends as a condition of approval, the applicant submit a traffic control plan that identifies the entrance and exit driveways on the subject site with the building permit application. The traffic control plan shall be reviewed and approved by the Current Planning Project Manager prior to building permit issuance. City of Renton Department of Community & Economic Development Hearing Examiner Recommendation SUNSET MULTI-SERVICE CENTER LUA18-000127,CU-H Report of March 27, 2018 Page 11 of 12 SR_HEXReport_SunsetMultiService_LUA18000127_180320  g. Noise, Light and Glare: Potential noise, light and glare impacts from the proposed use shall be evaluated and mitigated. Staff Comment: The applicant states “The proposed use and building upgrades will not generate new light and glare impacts. Noise may occur to a limited extent during construction work. But since all work is expected to be within the existing building, it is anticipated that any noise would be minimal and during normal working hours.” Staff concurs the proposed use would not generate additional noise impacts to the surrounding neighborhood. Activities would be held indoors. Exterior noise impacts would be limited to vehicles arriving and departing the site and short term impacts related to the tenant improvements. The applicant has not proposed and has not shown the need for any additional lighting to utilize the existing building. The parking lot contains three light standards approximately 20-feet in height. The site’s mature landscaping mitigates potential glare impacts. Compliant if condition of approval is met h. Landscaping: Landscaping shall be provided in all areas not occupied by buildings, paving, or critical areas. Additional landscaping may be required to buffer adjacent properties from potentially adverse effects of the proposed use. Staff Comment: The applicant contends the existing landscaping will be maintained with no vegetation removal associated with the proposed change of use. The applicant has provided a Landscape Memo (Exhibit 9) that details existing conditions and provides recommendations for future planting to meet the goals and intent of the landscaping conditional use criteria. The existing landscaping along the street frontage, eastern perimeter, and northern portion of the property consist of mature vegetation that provides a buffer to NE 12th St with a gentle berm and four large western red cedar trees and wide bands of landscaping along the north and east consisting of numerous large trees with understory that provides sight-obscuring or visual buffers to abutting properties. The memo provides recommendations for planting in areas along the western portion of the property to fill in gaps along the perimeter and additional planting in a bare area located near the northwest façade of the building. Proposed planting in these areas are strategic as they attempt to fill in gaps of existing mature landscaping while not impacting the root zones of the established vegetation. Additionally, there are areas on the subject property that are shaded from the mature vegetation and it would be difficult to establish new plantings without the requisite solar exposure. Staff concurs with the applicant’s proposal to provide additional landscaping as suggested in order to buffer adjacent residential properties from the proposed use. Therefore staff recommends as a condition of approval, the applicant submit a landscape plan with the building permit application. The plan shall be based on the recommendations of the Landscape Memo prepared by Nakano Associates dated February 9, 2018 (Exhibit 9) and be reviewed and approved by the Current Planning Project Manager prior to building permit issuance. 19. Availability and Impact on Public Services: Compliance Availability and Impact on Public Services Analysis City of Renton Department of Community & Economic Development Hearing Examiner Recommendation SUNSET MULTI-SERVICE CENTER LUA18-000127,CU-H Report of March 27, 2018 Page 12 of 12 SR_HEXReport_SunsetMultiService_LUA18000127_180320  Police and Fire: Police and Fire Prevention staff indicates that sufficient resources exist to furnish services to the proposed development; subject to the condition that the applicant provides Code required improvements and fees. Fire impact fees may be applicable based on the square footage as determined by the Fire Department. Impact fees are paid at time of building permit issuance.  Storm Water: An adequate drainage system shall be provided for the proper drainage of all surface water. Staff Comment: The project does not propose to add or replace any impervious surface. Drainage review is not required.  Water: The tenant improvement is not proposing any substantial plumbing changes, however water system improvements may be necessary to provide service as indicated by the Development Engineering plan reviewer (Exhibit 10). The Renton Regional Fire Authority has not required any changes to the fire flow demand for this project.  Sanitary Sewer: The tenant improvement is not proposing any substantial plumbing changes or a commercial kitchen. No upgrades to the sewer service is required. I. CONCLUSIONS: 1. The subject site is located in the Residential High Density (HD) Comprehensive Plan designation and complies with the goals and policies established with this designation, see FOF 15. 2. The subject site is located in the Residential – 14 (R-14) zoning designation and complies with the zoning and development standards established with this designation provided the applicant complies with City Code and conditions of approval, see FOF 16. 3. The proposed Conditional Use complies with the Critical Areas Regulations provided the applicant complies with City Code and conditions of approval, see FOF 17. 4. The proposed Conditional Use complies with the Conditional Use Permit criteria as established by City Code provided the applicant complies all advisory notes and conditions of approval, see FOF 18. 5. There are adequate public services and facilities to accommodate the proposed Conditional Use, see FOF 19. J. RECOMMENDATION: Staff recommends approval of the Sunset Multi-Service and Career Development Center Conditional Use Permit, File No. LUA18-000127, as depicted in Exhibit 4, subject to the following conditions: 1. The applicant shall submit a refuse and recycling screening detail with the building permit application. The screening detail shall be reviewed and approved by the Current Planning Project Manager prior to building permit issuance. 2. The applicant shall submit a traffic control plan that identify the entrance and exit driveways on the subject site with the building permit application. The traffic control plan shall be reviewed and approved by the Current Planning Project Manager prior to building permit issuance. 3. The applicant shall submit a final landscape plan with the building permit application. The plan shall be based on the recommendations of the Landscape Memo prepared by Nakano Associates dated February 9, 2018 (Exhibit 9) and be reviewed and approved by the Current Planning Project Manager prior to building permit issuance. CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT REPORT TO THE HEARING EXAMINER, EXHIBITS Project Name: Sunset Multi-Service & Career Development Center Project Number: LUA18-000127, CU-H Date of Hearing March 27, 2018 Staff Contact Matt Herrera, Senior Planner Project Contact/Applicant Mark Gropper, Renton Housing Authority Project Location 2902 NE 12th St. The following exhibits were entered into the record: Exhibit 1: Staff Report to the Hearing Examiner Exhibit 2: Environmental Review Committee Memorandum Exhibit 3: Sunset Area Community Environmental Impact Statement Exhibit 4: Sunset Area Planned Action Ordinance Exhibit 5: Site Plan Exhibit 6: Floor Plan Exhibit 7: Trip Generation/Assessment prepared by Heath & Associates, dated February 2018 Exhibit 8: Concurrency Test Memorandum prepared by Brianne Bannwarth, Development Engineering Manager, dated March 2, 2018 Exhibit 9: Exterior Elevations Exhibit 10: Landscape Memorandum prepared by Nakano Associates, dated February 9, 2018 Exhibit 11: Advisory Notes to Applicant CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT HEARING EXAMINER DECISION, EXHIBITS Project Name: Sunset Multi-Service & Career Development Center Project Number: LUA18-000127, CU-H Date of Hearing March 27, 2018 Staff Contact Matt Herrera, Senior Planner Project Contact/Applicant Mark Gropper, Renton Housing Authority Project Location 2902 NE 12th St. The following exhibits were admitted during the hearing: Exhibits 1-11: Hearing Examiner Staff Report and Exhibits Exhibit 12: PowerPoint Presentation Exhibit 13: City of Renton Mapping System - COR Maps http://rp.rentonwa.gov/HTML5Public/Index.HTML?viewer=CORMaps Exhibit 14: Google Maps http://www.google.com/maps/ DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ENVIRONMENTAL REVIEW COMMITTEE MEMORANDUM SUNSET AREA PLANNED ACTION CONCURRENCE LAND USE FILE NUMBER: LUA18-000127, CU-H APPLICANT: Renton Housing Authority PROJECT NAME: Sunset Multi-Service & Career Development Center DESCRIPTION OF PROPOSAL: The applicant is requesting concurrence from the Environmental Review Committee (ERC) for the proposed Sunset Multi-Service & Career Development Center to be located in the former Highlands Library building located at 2900 NE 10th St. The site is located within the boundaries of the Sunset Area Planned Action Study Area and environmental review was conducted as part of the Sunset Area Planned Action Environmental Impact Statement (EIS) (Exhibits 2 and 3). Repurposing the former library is consistent with Sunset Area Community EIS assumptions and mitigation measures; therefore a SEPA threshold determination is not required for the proposal. The applicant is also requesting Hearing Examiner Conditional Use Permit approval for the proposed Sunset Multi-Service and Career Development Center (Exhibits 4 and 5). The former library property is under contract for purchase by the Renton Housing Authority (RHA). The existing 6,160 square foot building is located on a 1.4 acre lot. No exterior site construction improvements or building additions are proposed. Proposed interior improvements would support multiple services such as job training assistance, ESL and adult education classes, and potentially a foodbank. While the property will be owned by the RHA, the regional non-profit Neighborhood House would manage the proposed service center. Access to the site will remain in the two existing driveways along NE 12th St. The subject property contains 26 vehicle parking spaces. PROJECT MITIGATION: Mitigation measures identified in the EIS that are applicable to this proposal include those related to transportation. Planned Action applicants shall pay a Transportation Impact Fee as determined by the Renton Municipal Code at the time of payment, payable to the City as specified in the Renton Municipal Code. Planned Action applicants shall provide a traffic analysis estimating trips generated by their proposed development and demonstrate conformance with the Planned Action Ordinance (Ordinance #5813) trip ranges and thresholds as well as demonstrate conformance with the City’s concurrency requirements in RMC 4-6-070. The applicant’s traffic analysis (Exhibit 6) identifies a trip reduction of 264 average daily trips from the previous library use. Weekday AM peak would generate six new net trips and weekday PM peak would decrease by 32 net trips. The proposal passed the City’s Concurrency test (Exhibit 7) and are within the Planned Action trip ranges. CONCURRENCE: Upon determination by the City’s Environmental Review Committee that the proposal meets the criteria outlined in the Planned Action Ordinance and qualifies as a planned action, the proposal shall not require a SEPA threshold determination, preparation of an EIS, or be subject to further review pursuant to SEPA. LOCATION OF PROPOSAL: 2900 NE 10th Street – Former Highlands Library LEAD AGENCY/RESPONSIBLE ENTITY: City of Renton Environmental Review Committee The City’s Environmental Review Committee designates the proposal as a “planned action”, pursuant to RCW 43.21C.030, as it meets all of the following conditions: CityofRentonDepartmentofCommunity&EconomicDevelopmentEnvironmentalReviewCommitteeMemoSUNSETMULTI-SERWCECENTERLUA8-000127,CU-HMarch12,2018Page2of2f’TheproposalislocatedwithintheSunsetPlannedActionArea..TheproposedusesandactivitiesareconsistentwiththosedescribedinthePlannedActionEISandPlannedActionQualifications.,,TheproposaliswithinthePlannedActionthresholdsandothercriteriaofthePlannedActionQualifications.,,TheproposalisconsistentwiththeCityofRentonComprehensivePlanandapplicablezoningregulations.,Theproposal’ssignificantadverseenvironmentalimpactshavebeenidentifiedinthePlannedActionElS.Theproposal’simpactshavebeenmitigatedbyapplicationofthemeasuresidentifiedin/AttachmentBofOrdinance#5813,andotherapplicableCityregulations,togetherwithanymodificationsorvariancesorspecialpermitsthatmayberequired.,,Theproposalcomplieswithallapplicablelocal,stateand/orfederallawsandregulations,andtheEnvironmentalReviewCommitteedeterminesthattheseconstituteadequatemitigation./TheproposalisnotanessentialpublicfacilityasdefinedbyRCW.36.70A.200(1).SIGNATURES:‘RickM.Marshall,AdministratorDatePublicWorksepartmentRentonRegionalFireAuthority____________________(KellyBeymer,AdministratorDateC.E.Vincent,AdministratorDateCommunityServicesDepartmentDepartmentofCommunity&EconomicDevelopmentExhibitsExhibit1ERCMemoExhibit2SunsetAreaCommunityEISExhibit3SunsetAreaPlannedActionOrdinanceExhibit4SitePlanExhibit5FloorPlanExhibit6TripGenerationandAssessmentpreparedbyHeathandAssociates,datedFebruary2018Exhibit7ConcurrencyTestMemorandumpreparedbyBrianneBannwarth,DevelopmentEngineeringManager,datedMarch2,2018 SUNSET AREA COMMUNITY PLANNED ACTION FINAL NEPA/SEPA ENVIRONMENTAL IMPACT STATEMENT • VOLUME 1 • APRIL 2011 Issued by: City of Renton NEPA Responsible Entity and SEPA Lead Agency Prepared in partnership with: Renton Housing AuthorityRenton Housing Authority CITY OF RENTON, WASHINGTON ORDINANCE NO. 5813 AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING ORDINANCE NOS. 5610 AND 5740, ADDING FIVE PARCELS AND REDISTRIBUTING, BUT NOT INCREASING, THE TOTAL NUMBER OF HOUSING UNITS IN THE SUNSET TERRACE REDEVELOPMENT AREA, AND REVISING A PLANNED ACTION DESIGNATED FOR THE SUNSET AREA PURSUANT TO THE STATE ENVIRONMENTAL POLICY ACT(SEPA). THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES ORDAIN AS FOLLOWS: SECTION I. Findin s. The Council finds as follows: A. The City is subject to the requirements of the Growth Management Act, RCW 36.70A ("GMA") and is located within an Urban Growth Area; B. The City has adopted a Comprehensive Plan complying with the GMA, and has amended the Comprehensive Plan to address transportation improvements and capital facilities specific to the Sunset Area; C. The City has adopted a Community Investment Strategy, development regulations, and design guidelines specific to the Sunset Area, as designated in Attachment A, which will guide growth and revitalization of the area, including the Sunset Terrace public housing redevelopment area identified in Attachment C; D. The City has prepared an Environmental Impact Statement (EIS) for the Sunset Area, supplemented by addenda, that addresses the probable significant environmental impacts associated with the location, type, and amount of development anticipated in the Planned Action area; 1 41° 01' 40"295.00'NE10° 23' 13"11.74'NE79° 09' 57"51.77'SE0° 34' 38"289.98'S E 67° 02' 29"52.62'SW0° 18' 30"41.86'S E 88° 58' 08"168.16'NW3° 38' 16"125.63'NE(E) LIBRARY BUILDING6,160 SF(E) PARKINGPARCEL # 722780-204061,133 SF (1.40 ACRES)ZONING = R-141234567891011121314151617181920212223242526722780-1776ZONE: CV722780-1655ZONE: R-14 722780-1651ZONE: R-14722780-1645ZONE: R-14722780-1715ZONE: R-14722780-1710ZONE: R-14722780-1705ZONE: R-14722780-1700ZONE: R-14722780-1685ZONE: R-14NE 12TH STREETROW WIDTH = 50'-0"OUTLINE OF ROOF ABOVE7'-7 3/4"20'-8 5/8"72'-0 1/2"5 2 '-1 0 3 /8 "TYP9'-0"13'-4 3/4"12'-0"8'-0"108'-0"4'-8 1/4"12'-9 3/4"6'-0"3'-2 7/8"6'-0"18'-0"26'-0"18'-0"16'-7 5/8"8'-6" 7'-0" 8'-6"45'-2"48'-0"12'-0"53'-2"36'-0"57'-2"16'-0"33'-2"10'-10"37'-2"(E) STREET LIGHT, TYP(E) BENCH(E) SCULPTURE(E) BENCH(E) BIKE RACK(E) CHAIN-LINK FENCE, TYP(E) DUMPSTER AREA89° 25' 21"41.14'SW(E) GATE(E) CHAIN-LINK FENCE1720 12th AvenueSeattle, WA 98122CONTACT: Grace Kim, AIAv (206) 285.1589e grace@schemataworkshop.comCopyright Schemata Workshop, Inc.1234512345DCBADCBAarchitectSchemata Workshop, Inc.ownerRenton Housing AuthorityAuthor:Checker:2900 NE 10th StRenton, WA 98056CONTACT: Mark Gropperv (425) 226.1850CITY OF RENTON STAMPArchitect Project No:NOTE: FULL SCALE SHEET SIZE IS 22" X 34"2/9/2018 1:12:51 PMA002SITE PLAN1604SUNSETMULTI-SERVICE& CAREERDEVELOPMENTCENTER2902 NE 12th StreetRenton, WA 98056CONDITIONAL USE PERMIT2/9/18JW, CP, SHGK 1" = 20'-0"A3SITE PLANNO DATE DESCRIPTION WH1EA75432CDB692'-0"80'-0"A201A3A201B4COUNSELING ROOM 1CLASSROOM 2CLASSROOM 1 STORAGE MECHANICAL MEETING ROOM SITE COORDINATOR/RECEPTIONFLEX SPACE/CHILDCAREOFFICE WCWCSTORAGEMANAGERCOMPUTER LAB STORAGE MAINTENANCEGLASS FOLDING OR SLIDING WALLRELITE ABOVECOUNSELING ROOM 2NEW HARDWARE IN (E) DOORNEW HARDWARE IN (E) DOOR12'-0"52'-0"16'-0"36'-0"56'-0"A201B1A201D2(E) WINDOWS AT 12'-1 1/2" A.F.F.(E) WINDOWS AT 10'-0" A.F.F.(E) WALL TO REMAIN LEGENDNEW WALL 1720 12th AvenueSeattle, WA 98122CONTACT: Grace Kim, AIAv (206) 285.1589e grace@schemataworkshop.comCopyright Schemata Workshop, Inc.1234512345DCBADCBAarchitectSchemata Workshop, Inc.ownerRenton Housing AuthorityAuthor:Checker:2900 NE 10th StRenton, WA 98056CONTACT: Mark Gropperv (425) 226.1850CITY OF RENTON STAMPArchitect Project No:NOTE: FULL SCALE SHEET SIZE IS 22" X 34"2/9/2018 1:12:58 PMA101FLOOR 1 PLAN1604SUNSETMULTI-SERVICE& CAREERDEVELOPMENTCENTER2902 NE 12th StreetRenton, WA 98056CONDITIONAL USE PERMIT2/9/18JW, CP, SHGK 1/8" = 1'-0"A3FLOOR 1 PLAN - OPTION BNO DATE DESCRIPTION RHA MULTI-SERVICE CENTER TRIP GENERATION AND ASSESSMENT – LEVEL 1 TABLE OF CONTENTS 1. Project Description ......................................................................................................3 2. Existing Conditions ......................................................................................................3 3. Future Traffic Conditions .............................................................................................8 4. Summary .....................................................................................................................10 Appendix LIST OF TABLES 1. Bus Routes ..................................................................................................................7 2. Project Trip Generation ...............................................................................................8 LIST OF FIGURES 1. Vicinity Map & Roadway System .................................................................................4 2. Site Plan ......................................................................................................................5 2 RHA MULTI-SERVICE CENTER TRIP GENERATION AND ASSESSMENT – LEVEL 1 1. PROJECT DESCRIPTION This report summarizes anticipated traffic impacts related to the proposed RHA Multi- Service Center project in the City of Renton. The project consists of using an existing 6,160 square foot building which was previously occupied by the Renton Highland Library and converting into a multi-service and career development center. The project site is located on the north side of NE 12th Street on parcel number 722780-2040 and comprises approximately 1.4 acres. Access and parking configuration is proposed to remain via one eastern ingress and one western egress and offers 26 on-site parking stalls. Surrounding development consists of commercial uses to the east and a mixture of residential and local school uses in the remaining areas. Figure 1 on the following page shows the general site location and roadway network serving the vicinity. A site plan for of the project is given on Figure 2. 2. EXISTING CONDITIONS 2.1. Existing Roadway Characteristics The street network serving the proposed project consists of a variety of roadways including SR-900 to the east and local residential streets. Characteristics for these roadways vary with respect to lane widths, grades, speeds, and function. The major roadway bordering and providing access to the site is listed and described below. NE 12th Street.: is an east-west, two-lane collector that borders the south side of the project site. The total width of the roadway near the project is approximately 38 feet and includes on-street parking along either side. A posted speed limit of 25 mph in conjunction with a school speed limit of 20 mph when children are present is found directly west of the site. Complete curb, gutter, and sidewalk are offered along both sides of the roadway from Lynwood Avenue NE to Dayton Place NE. 3 4 5 2.2. Non-Motorist Traffic The surrounding vicinity currently offers non-motorist facilities in the form of complete sidewalk networks and marked pedestrian crossings on the primary NE 12th Street roadway. ADA accessible ramps with detectable truncated domes were identified at the nearby intersections. Complete sidewalk paths are also available to the nearby transit routes which are discussed below. No safety issues to pedestrian traffic are anticipated. 2.3. Transit Service A review of the Metro Transit System indicates that transit service is provided in the vicinity. A summary of the closest routes and approximate walking distance is provided in Table 1 below. Table 1 Bus Routes Route Description Weekday Service Weekend Nearest Stop 105 Renton Highland to Renton TC 4:30 AM – 11:20 PM 30 minute headways 6:20 AM – 11:30 PM 60 minute headways 450’ west 111 Maplewood to Lake Kathleen to Downtown Seattle 7:20 AM – 11:20 PM 60 minute headways N/A 700’ east 240 Bellevue TC to Renton TC 5:00 AM – 11:50 PM 30 minute headways 7:00 AM – 11:50 PM 30 minute headways 1000’ southeast As shown from the table above, multiple frequent transit routes are available within walking distance to the project site. Complete sidewalk networks with marked crosswalks at major crossings are offered leading to each bus stop. Given the nature of the project and proximity to nearby bus stops, public transit is anticipated to be utilized. Refer to the Metro Transit System schedule for detailed Route information. 2.4. Access Driveway Safety Access to the site is proposed to remain via one inbound only and one outbound only configuration (see Figure 2). Assessments of driveway sight distance were analyzed to determine if available visibility meets standards needed to ensure project traffic can safely exit the site and enter NE 12th Street. Sight distance requirements are based on AASHTO’s Green Book (2011) standards. Based on the 25 mph posted speed limit on NE 6 12th Street, 240 and 280 feet of unobstructed sight distance are needed for outbound right- and left turn movements, respectively. Preliminary measurements at the outbound access location indicate sight distance requirements are met with lines of sight exceeding 300 feet in either direction. No safety issues are identified with the continued use of the existing access location. 2.5. Roadway Improvements A review of the City of Renton’s 2018-2023 Six-Year Transportation Improvement Program indicates improvement projects are planned in the vicinity. A summary of the nearest project descriptions are provided below. NE Sunset Boulevard (SR 900) Corridor Improvements (TIP No. 15) This scope of this project intends to perform a number of improvements to the SR-900 corridor starting from I-405 to the west and ending at the City of Renton limits to the east. The total length is approximately 3.0 miles. Improvements consists of lane channelization, traffic signal modification, access management, among others. Pedestrian, transit, and bicycle needs will also be addressed. The design of the project is 30 percent complete and has an estimated cost of $33,125,833. The project is not fully funded at this time. Sunset Area Green Connections (TIP No. 16) This scope of this project intends to construct multi-modal improvements to a number of residential roadways located in the Sunset Area Community. These roadways are planned to be widened, extended, and/or realigned and improve pedestrian mobility. Roadways included are NE 10th Street, NE Sunset Lane, Harrington Avenue NE, NE 12th Street, Edmonds Avenue NE, Jefferson Avenue NE, Kirkland Avenue NE, and Glennwood Avenue NE. The project has an estimated cost of $22,200,000 and is currently not fully funded. 7 3. FUTURE TRAFFIC CONDITIONS 3.1. Trip Generation Trip generation is used to determine the magnitude of project impacts on the surrounding street system. This is denoted by the quantity or specific number of new trips that enter or exit a project during a designated time period, such as a specific peak hour or an entire day. As the site has previously been used as a library, the goal of the analysis is to determine the estimated net difference in traffic subsequent to the RHA Multi-Service Center buildout. Trip generation data for the library use was obtained from the Institute of Transportation Engineer's (ITE) publication Trip Generation, 10th Edition. ITE has no defined use that reflects the proposed project so trips are estimated using employee count, hours of operations, and services provided. Proposed Use: The project is a multi-service career development and social center providing services such as job training assistance, ESL and other adult education classes to individuals or small groups. The project proponent indicates that no more than 20 clients a day are anticipated during the Monday through Friday, 8:00 AM to 5:00 PM hours of operations. Additionally, the building will staff 12 full-time employees. As services provided are generally held midday, the AM and PM peak hour will primarily constitute employee trips. Table 2 below summarizes and compares peak hour trips from the proposed library using ITE Library (LUC 590) data and estimated project trips. Assuming 1 employee translates to 1 inbound trip for the AM and 1 outbound trip in the PM, total trips are calculated at 12 inbound AM peak hour trips and 12 outbound PM peak hour trips. 6 miscellaneous trips were included in the PM peak hour to reflect potential clients (3 in/3 out). The average daily traffic (ADT) was estimated to be ten times the total PM peak hour trips. Table 2 Project Trip Generation Land Use Size (th.sq.ft) ADT AM Peak-Hour Trips PM Peak-Hour Trips In Out Total In Out Total Existing Library 6.16 444 2 4 6 24 26 50 Proposed Service Center 6.16 180 0 12 12 3 15 18 Net New -264 -2 8 6 -21 -11 -32 8 Based on Table 2, the proposed multi-service center is anticipated to generate significantly less traffic than the previous library use. The AM peak hour is anticipated to increase by 6 AM peak hour trips due to employee count; ADT and PM peak hour trips are significantly lower. 3.2. Parking The existing site offers 26 parking stalls (including 2 ADA stalls) and will remain unchanged. Given the anticipated reduced use with respective to vehicular demand, the 26 parking stalls are anticipated to adequately support the project’s parking demands. For reference, the 85th percentile peak parking demand for a library based on ITE’s Parking Generation, 4th Edition is 4.19 vehicles per 1,000 square foot. Applying ITE’s demand to the previous library is as follows: 4.19 vehicles x 6,160 s.f. = 25.8 or 26 stalls Given that the existing parking lot adequately supports a more intense use, the 26 stalls are anticipated to meet project demands. A library attracts many more than the approximate 20 visitors per day the multi-service center would serve. Moreover, the services provided will be scheduled sequentially throughout the day and are targeted towards individuals or small groups. As such, not all 20 visitors will arrive simultaneously but rather throughout the business operating hours. Assuming each employee occupies a stall, 14 unoccupied stalls will be available for clients (26 stalls less 12 employees = 14 open stalls). The proximity to local transit in conjunction with complete sidewalk networks may also encourage other modes of transportation. As indicated in Section 2.3 Transit Service, three bus routes are available in walking distance to the site with frequent service. Furthermore, the vicinity allows on-street parking opportunities along either side of the roadway in the unlikely event should spillover parking ever occur. 9 4. SUMMARY The RHA Multi-Service Center project plans on using the old 6,160 square foot library building in the City of Renton to convert into a social service hub. The project site is located on the north side of NE 12th Street on parcel number: 722780-2040. Provided services include, but not limited to, job training assistance, ESL classes, and other adult education opportunities targeted to individuals or small groups. The overall site and access configuration is proposed to remain via one easterly inbound entrance and one westerly outbound entrance. Public transit routes are offered within walking distance to the site with complete sidewalk networks. The traffic generated from the proposed project was estimated using employee count, hours of operation, and services provided given the unique use with limited comparable ITE data. The project overall is anticipated to generate significantly less traffic than the previous library use. A trip generation summary is provided in Table 2. Similarly, the parking demand is anticipated to be adequately met with the existing 26 on-site parking stalls. Based on the analysis provided, no off-site mitigation is identified at this time. 10 RHA MULTI-SERVICE CENTER TRIP GENERATION AND ASSESSMENT – LEVEL 1 APPENDIX 11 1/23/2018 https://itetripgen.org/PrintGraph.htm?code=590&ivlabel=QFQAF&timeperiod=AWDVTE&x=6.16&edition=385&locationCode=General Urban/Su… https://itetripgen.org/PrintGraph.htm?code=590&ivlabel=QFQAF&timeperiod=AWDVTE&x=6.16&edition=385&locationCode=General%20Urban/Subur…1/1 Library (590) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday Setting/Location: General Urban/Suburban Number of Studies: 6 Avg. 1000 Sq. Ft. GFA: 16 Directional Distribution: 50% entering, 50% exiting Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate Range of Rates Standard Deviation 72.05 57.30 - 78.80 7.34 Data Plot and Equation T = Trip EndsX = 1000 Sq. Ft. GFA Study Site Average RateFitted Curve Fitted Curve Equation: Ln(T) = 0.99 Ln(X) + 4.28 R²= 0.97 Trip Generation Manual,10th Edition Institute of Transportation Engineers 0 5 10 15 20 25 300 500 1,000 1,500 6 444 437 12 1/23/2018 https://itetripgen.org/PrintGraph.htm?code=590&ivlabel=QFQAF&timeperiod=TASIDE&x=6.16&edition=385&locationCode=General Urban/Sub… https://itetripgen.org/PrintGraph.htm?code=590&ivlabel=QFQAF&timeperiod=TASIDE&x=6.16&edition=385&locationCode=General%20Urban/Suburb…1/1 Library (590) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies: 4 Avg. 1000 Sq. Ft. GFA: 19 Directional Distribution: 71% entering, 29% exiting Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate Range of Rates Standard Deviation 1.00 0.52 - 1.33 0.30 Data Plot and Equation Caution – Small Sample Size T = Trip EndsX = 1000 Sq. Ft. GFA Study Site Average RateFitted Curve Fitted Curve Equation: T = 1.75(X) - 14.59 R²= 0.86 Trip Generation Manual,10th Edition Institute of Transportation Engineers 0 5 10 15 20 25 300 5 10 15 20 25 30 6 6 13 1/23/2018 https://itetripgen.org/PrintGraph.htm?code=590&ivlabel=QFQAF&timeperiod=TPSIDE&x=6.16&edition=385&locationCode=General Urban/Sub… https://itetripgen.org/PrintGraph.htm?code=590&ivlabel=QFQAF&timeperiod=TPSIDE&x=6.16&edition=385&locationCode=General%20Urban/Suburb…1/1 Library (590) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location: General Urban/Suburban Number of Studies: 9 Avg. 1000 Sq. Ft. GFA: 15 Directional Distribution: 48% entering, 52% exiting Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate Range of Rates Standard Deviation 8.16 4.00 - 12.25 2.52 Data Plot and Equation T = Trip EndsX = 1000 Sq. Ft. GFA Study Site Average RateFitted Curve Fitted Curve Equation: T = 9.33(X) - 17.13 R²= 0.75 Trip Generation Manual,10th Edition Institute of Transportation Engineers 0 5 10 15 20 25 300 100 200 300 6 50 40 14 14 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: March 2, 2018 TO: Matt Herrera, Senior Planner FROM: Brianne Bannwarth, Development Engineering Manager SUBJECT: Traffic Concurrency Test – Sunset Multi-Service Center; LUA18-000127, CU-H The applicant is requesting a Hearing Examiner Conditional Use Permit approval to locate the proposed Sunset Multi-Service and Career Development Center. The subject property and building is the site of the former Sunset Neighborhood Library located at 290 2 NE 12th St that was recently acquired by the Renton Housing Authority (RHA). The project site is located within the Residential-14 (R-14) zone. The existing 6,160 square foot building is located on a 1.4 acre lot. No exterior site construction improvements or building additions are proposed. Proposed interior improvements would support multiple services such as job training assistance, ESL and adult education classes, and potentially a foodbank. While the property is owned by the RHA, the regional non-profit Neighborhood House would manage the proposed service center. Access to the site will remain in the existing locations along NE 12th St. The subject property contains 26 parking spaces. The proposed development would generate a decrease of approximately 264 net new average weekday daily trips. During the weekday AM peak hour, the project would generate approximately 6 net new trips (4 inbound and 2 outbound). During the weekday PM peak hour, the project would generate a decrease of approximately 32 net new trips (-15 inbound and -17 outbound). The proposed project passes the City of Renton Traffic Concurrency Test per RMC 4- 6-070.D as follows: Transportation Concurrency Test – Sunset Multi-Service Center Page 2 of 3 March 7, 2018 Traffic Concurrency Test Criteria Pass Implementation of citywide Transportation Plan Yes Within allowed growth levels Yes Project subject to transportation mitigation or impact fees No Site specific street improvements to be completed by project No Traffic Concurrency Test Passes Evaluation of Test Criteria Implementation of citywide Transportation Plan: The City’s investment in completion of the forecast traffic improvements is 130% of the scheduled expenditure through 2017. Within allowed growth levels: As shown on the attached citywide traffic concurrency summary, the calculated citywide trip capacity for concurrency with the city adopted model for 2017 is 2,078 trips, which provides sufficient capacity to accommodate a decrease of 32 trips from this project. A resulting 2,110 trips are remaining. Project subject to transportation mitigation or impact fees: The project will be subject to transportation impact fees at time of building permit for the project. Site specific street improvements to be completed by project: The project will be required to complete all internal and frontage street improvements for the building prior to occupancy. Any additional off-site improvements identified through SEPA or land use approval will also be completed prior to final occupancy. Background Information on Traffic Concurrency Test for Renton The City of Renton Traffic Concurrency requirements for proposed development projects are covered under Renton Municipal Code (RMC) 4-6-070. The specific concurrency test requirement is covered in RMC 4-6-070.D, which is listed for reference: D. CONCURRENCY REVIEW PROCESS: 1. Test Required: A concurrency test shall be conducted by the Department for each nonexempt development activity. The concurrency test shall determine consistency with the adopted Citywide Level of Service Index and Concurrency Management System established in the Transportation Element of the Renton Comprehensive Plan, according to rules and procedures established by the Department. The Department shall issue an initial concurrency test result describing the outcome of the concurrency test. Transportation Concurrency Test – Sunset Multi-Service Center Page 3 of 3 March 7, 2018 2. Written Finding Required: Prior to approval of any nonexempt development activity permit application, a written finding of concurrency shall be made by the City as part of the development permit approval. The finding of concurrency shall be made by the decision maker with the authority to approve the accompanying development permits required for a development activity. A written finding of concurrency shall apply only to the specific land uses, densities, intensities, and development project described in the application and development permit. 3. Failure of Test: If no reconsideration is requested, or if upon reconsideration a project fails the concurrency test, the project application shall be denied by the decision maker with the authority to approve the accompanying development activity permit application. The Concurrency Management System established in the Transportation Element on page XI -65 of the Comprehensive Plan states the following: Based upon the test of the citywide Transportation Plan, consideration of growth levels included in the LOS-tested Transportation Plan, payment of a Transportation Mitigation Fee, and an application of site specific mitigation, development will have met City of Renton concurrency requirements. FLOOR 10"T.O. BRICK - LOW ROOF10'-0"EACDT.O. PLATE - LOW ROOF12'-1 1/2"T.O.BRICK - HIGH ROOF12'-0"T.O.PLATE - HIGH ROOF15'-1 1/2"BT.O.HIGH ROOF18'-7 1/2"(E) ROOFTOP UNITSFLOOR 10"175432T.O.BRICK - HIGH ROOF12'-0"T.O.PLATE - HIGH ROOF15'-1 1/2"6T.O.HIGH ROOF18'-7 1/2"3 (E) ROOFTOP UNITSFLOOR 10"T.O. BRICK - LOW ROOF10'-0"175432T.O. PLATE - LOW ROOF12'-1 1/2"6(E) EXTERIOR RECESSED SQUARE LIGHT FIXTURE, TYP(E) BOOK RETURN3 (E) ROOFTOP UNITSFLOOR 10"T.O. BRICK - LOW ROOF10'-0"EACDT.O. PLATE - LOW ROOF12'-1 1/2"T.O.BRICK - HIGH ROOF12'-0"T.O.PLATE - HIGH ROOF15'-1 1/2"BT.O.HIGH ROOF18'-7 1/2"(E) ROOFTOP UNITS(E) DARK GRAY STANDING SEAM METAL(E) DARK GRAY PAINTED WOOD(E) RED BRICK(E) LOUVERS(E) GLAZINGELEVATION LEGENDGENERAL NOTES - ELEVATIONS1. NO SURVEY INFORMATION AVAILABLE. GRADES SHOWN ARE RELATIVE.1720 12th AvenueSeattle, WA 98122CONTACT: Grace Kim, AIAv (206) 285.1589e grace@schemataworkshop.comCopyright Schemata Workshop, Inc.1234512345DCBADCBAarchitectSchemata Workshop, Inc.ownerRenton Housing AuthorityAuthor:Checker:2900 NE 10th StRenton, WA 98056CONTACT: Mark Gropperv (425) 226.1850CITY OF RENTON STAMPArchitect Project No:NOTE: FULL SCALE SHEET SIZE IS 22" X 34"2/9/2018 1:13:01 PMA201EXTERIOR ELEVATIONS1604SUNSETMULTI-SERVICE& CAREERDEVELOPMENTCENTER2902 NE 12th StreetRenton, WA 98056CONDITIONAL USE PERMIT2/9/18JW, CP, SHGK 1/8" = 1'-0"D2ELEVATION - EAST 1/8" = 1'-0"B1ELEVATION - NORTH 1/8" = 1'-0"B4ELEVATION - SOUTH - NE 12TH ST 1/8" = 1'-0"A3ELEVATION - WESTNO DATE DESCRIPTION NAKANOASSOCIATES DESIGN FOR HEALTHY COMMUNITIES Memo 1 | Page LANDSCAPE ARCHITECTS 853 Hiawatha Place S Seattle WA 98144 Tel. 206 292 9392 www.nakanoassociates.com Project RHA Sunset Multi-Service & Career Development Center Date 02/09/2018 From Paula Gilmour, PLA, ASLA Subject CUP – Code compliance of existing landscape This memorandum addresses City of Renton CUP criterion #8 Landscaping: Landscaping shall be provided in all areas not occupied by buildings, paving, or critical areas. Additional landscaping may be required to buffer adjacent properties from potentially adverse effects of the proposed use. To this end, this memorandum addresses compliance of the existing landscape with Renton Municipal Code. RETENTION OF EXISTING LANDSCAPING AND EXISTING TREES ENCOURAGED: RMC 4-4-070 Section G.3 This requirement is met. Existing landscape and trees will be retained. STREET FRONTAGE LANDSCAPE AND FRONT YARD TREES: RMC 4-4-070 Sections F.1 and F.3 These requirements are met with a wide landscape bed and four large mature cedar trees along the front of the property. See Area C on L002. PARKING LOT LANDSCAPE: RMC 4-4-070 Sections F.6.a, F.6.b, H.4, and H.5 Renton Municipal Code requires 15 square feet of interior parking lot landscaping for each parking space. There are 26 existing stalls. No modifications to layout of the existing parking lot are proposed for this building remodel project. Per code 390 square feet of interior parking landscape is required for 26 stalls. The existing parking lot includes a total of 72 square feet of interior parking landscape in two parking islands. These parking islands are vegetated with mature evergreen shrubs. See Area C on drawing L002. Pole lighting for the parking lot is located in each parking island. These islands do not include trees. Installation of trees in these islands would conflict with illumination of the parking lot. The perimeter parking landscape area between the parking lot and the right-of-way boundary at the edge of the public sidewalk exceeds 17 feet in width. See Area C on drawing L002. This width is greater than code required 10 feet minimum perimeter parking lot landscaping. Four large cedar trees create a nearly continuous canopy over the landscape area. This landscape bed is gently bermed (See drawing L002, View 8). There are no shrubs or groundcover plants in this landscape bed. Establishment of a new planting of shrubs or groundcover under these mature trees would be very difficult and attempts to do so could compromise the health of the cedars. NAKANOASSOCIATES DESIGN FOR HEALTHY COMMUNITIES Memo 2 | Page LANDSCAPE ARCHITECTS 853 Hiawatha Place S Seattle WA 98144 Tel. 206 292 9392 www.nakanoassociates.com The tree roots are near the soil surface, cedars inhibit growth of plants within their root zone, and a new planting would require irrigation. Even if shrubs could be established under the trees, these shrubs could negatively impact safety by blocking surveillance of the parking area and building entry from the street. The cedars provide a buffer between the street and parking area. PROJECTS ABUTTING LESS INTENSIVE ZONES OR USES: RMC 4-4-070 Section F.4.a, Renton Municipal Code requires a fifteen-foot (15’) wide partially sight-obscuring landscaped visual barrier, or ten-foot (10’0) wide fully sight obscuring landscape visual barrier along common property lines for a Nonresidential Developments in Residential Zones. Perimeter Landscape Areas (See attached drawings L001 through L003) AREA A – North portion of property: The area north of the building is heavily vegetated. There are numerous large trees. No changes are proposed for this area. This landscape provides a wide visual buffer between the building and neighboring residential properties. Sight-obscuring code requirements are met. AREA B - East property boundary: Code screening requirements are exceeded along this stretch of the property boundary. This wide band of naturalized landscape with trees and understory plants is greater than fifteen feet in width. AREA D – South section of west property boundary: The existing landscape with numerous trees and several understory plants creates a landscape buffer between properties, but it does not provide a visual barrier. See drawing L002 for images, a description of the landscape area, and proposed actions to increase screening along this property boundary. AREA E – Property boundary west of the building: The existing landscape with five large, mature, cherry trees creates a landscape buffer between properties, but it does not provide a visual barrier. See drawing L002 for images, a description of the landscape area, and proposed actions to increase screening along this property boundary. PERVIOUS AREAS SHALL HAVE LANDSCAPE TREATMENT: RMC 4-4-070 Section F.5. Landscape Area F currently has a landscape treatment of bark mulch over soil (See drawing L003). Shrubs and groundcover are not present in this area. Nearly half of this area is within the dripline of large cherry trees along the property boundary. Roots of these trees are visible at the soil surface and extend far from the tree trunks and extend beyond the dripline. See drawing L003 for images and proposed actions to enhance the landscape in this area. END OF MEMO DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 LUA18-000127 ADVISORY NOTES TO APPLICANT The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal process for the land use action. Planning: (Contact: Matt Herrera, 425-430-6593, mherrera@rentonwa.gov) 1. Commercial, multi-family, new single family and other nonresidential construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. 2. The applicant may not fill, excavate, stack or store any equipment, dispose of any material s, supplies or fluids, operate any equipment, install impervious surfaces, or compact the earth in any way within the area defined by the drip line of any tree to be retained. Development Engineering: (Contact: Ann Fowler, 425-430-7382, afowler@rentonwa.gov) 1. See Attached Development Engineering Memo March 2, 2018 Fire Authority: (Contact: Corey Thomas, 425-430-7024, cthomas@rentonwa.gov) 1. Separate plans and permits are required for the fire alarm system updates needed to accommodate the proposed tenant improvements. 2. Separate plans and permits would be needed if the applicant volunteers to install an approved fire sprinkler system. Sunset Multi-Service and Career Development Center File LUA18-000127, CU-H Public HearingMatt Herrera, Senior PlannerMarch 27, 2018 Project Proposal 2902 NE 12th St •Provide support services such as job training, ESL, and adult education classes. •6,160 square foot building. •No site or building construction. Proposed change of use to allow a service and social organization in the former Highlands Library building. Project Location •1.4 acre property •Renton Highlands Neighborhood •Building constructed in 1973. •Surface parking for 26 vehicles •Sunset Planned Action Area •Wellhead Protection Zone 2. Zoning and Land Use Designations •Residential-14 (R-14) Zoning. •Residential High Density Land Use. •Residential-14 and Center Village (CV) zoning surrounding. •Service and Social Organizations allowed use with Conditional Use Permit. Property Characteristics •Property contains frontage and access via two driveways onto NE 12th St. •Mature vegetation with new planting proposed. •Existing 25-foot lighting standards. Public Notice and Environmental Review •No public or agency comments since the February 22, 2018 Notice of Application. •Environmental Review Committee determined the project is compliant with Sunset Area Planned Action Ordinance and EIS. •No environmental threshold determination necessary. Transportation and Parking •Parking compliant with minimum standards for similar uses. •One space per 237sf of gfa. •Average Daily Trips would decrease from previous use. Staff Recommendation Staff finds the applicant has met the City’s Conditional Use Permit criteria with three conditions regarding: •Traffic control in parking lot; •Augment existing landscaping with new planting; and •Provide refuse and recycling enclosure Staff recommends approval of the Sunset Multi-Service and Career Development Center land use application.