Loading...
HomeMy WebLinkAboutERC_Report_Sunset_Multi-Service_Center_180312DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ENVIRONMENTAL REVIEW COMMITTEE MEMORANDUM SUNSET AREA PLANNED ACTION CONCURRENCE LAND USE FILE NUMBER: LUA18-000127, CU-H APPLICANT: Renton Housing Authority PROJECT NAME: Sunset Multi-Service & Career Development Center DESCRIPTION OF PROPOSAL: The applicant is requesting concurrence from the Environmental Review Committee (ERC) for the proposed Sunset Multi-Service & Career Development Center to be located in the former Highlands Library building located at 2900 NE 10th St. The site is located within the boundaries of the Sunset Area Planned Action Study Area and environmental review was conducted as part of the Sunset Area Planned Action Environmental Impact Statement (EIS) (Exhibits 2 and 3). Repurposing the former library is consistent with Sunset Area Community EIS assumptions and mitigation measures; therefore a SEPA threshold determination is not required for the proposal. The applicant is also requesting Hearing Examiner Conditional Use Permit approval for the proposed Sunset Multi-Service and Career Development Center (Exhibits 4 and 5). The former library property was recently purchased by the Renton Housing Authority (RHA). The existing 6,160 square foot building is located on a 1.4 acre lot. No exterior site construction improvements or building additions are proposed. Proposed interior improvements would support multiple services such as job training assistance, ESL and adult education classes, and potentially a foodbank. While the property is owned by the RHA, the regional non-profit Neighborhood House would manage the proposed service center. Access to the site will remain in the two existing driveways along NE 12th St. The subject property contains 26 vehicle parking spaces. PROJECT MITIGATION: Mitigation measures identified in the EIS that are applicable to this proposal include those related to transportation. Planned Action applicants shall pay a Transportation Impact Fee as determined by the Renton Municipal Code at the time of payment, payable to the City as specified in the Renton Municipal Code. Planned Action applicants shall provide a traffic analysis estimating trips generated by their proposed development and demonstrate conformance with the Planned Action Ordinance (Ordinance #5813) trip ranges and thresholds as well as demonstrate conformance with the City’s concurrency requirements in RMC 4-6-070. The applicant’s traffic analysis (Exhibit 6) identifies a trip reduction of 264 average daily trips from the previous library use. Weekday AM peak would generate six new net trips and weekday PM peak would decrease by 32 net trips. The proposal passed the City’s Concurrency test (Exhibit 7) and are within the Planned Action trip ranges. CONCURRENCE: Upon determination by the City’s Environmental Review Committee that the proposal meets the criteria outlined in the Planned Action Ordinance and qualifies as a planned action, the proposal shall not require a SEPA threshold determination, preparation of an EIS, or be subject to further review pursuant to SEPA. LOCATION OF PROPOSAL: 2900 NE 10th Street – Former Highlands Library LEAD AGENCY/RESPONSIBLE ENTITY: City of Renton Environmental Review Committee The City’s Environmental Review Committee designates the proposal as a “planned action”, pursuant to RCW 43.21C.030, as it meets all of the following conditions: CityofRentonDepartmentofCommunity&EconomicDevelopmentEnvironmentalReviewCommitteeMemoSUNSETMULTI-SERWCECENTERLUA8-000127,CU-HMarch12,2018Page2of2f’TheproposalislocatedwithintheSunsetPlannedActionArea..TheproposedusesandactivitiesareconsistentwiththosedescribedinthePlannedActionEISandPlannedActionQualifications.,,TheproposaliswithinthePlannedActionthresholdsandothercriteriaofthePlannedActionQualifications.,,TheproposalisconsistentwiththeCityofRentonComprehensivePlanandapplicablezoningregulations.,Theproposal’ssignificantadverseenvironmentalimpactshavebeenidentifiedinthePlannedActionElS.Theproposal’simpactshavebeenmitigatedbyapplicationofthemeasuresidentifiedin/AttachmentBofOrdinance#5813,andotherapplicableCityregulations,togetherwithanymodificationsorvariancesorspecialpermitsthatmayberequired.,,Theproposalcomplieswithallapplicablelocal,stateand/orfederallawsandregulations,andtheEnvironmentalReviewCommitteedeterminesthattheseconstituteadequatemitigation./TheproposalisnotanessentialpublicfacilityasdefinedbyRCW.36.70A.200(1).SIGNATURES:‘RickM.Marshall,AdministratorDatePublicWorksepartmentRentonRegionalFireAuthority____________________(KellyBeymer,AdministratorDateC.E.Vincent,AdministratorDateCommunityServicesDepartmentDepartmentofCommunity&EconomicDevelopmentExhibitsExhibit1ERCMemoExhibit2SunsetAreaCommunityEISExhibit3SunsetAreaPlannedActionOrdinanceExhibit4SitePlanExhibit5FloorPlanExhibit6TripGenerationandAssessmentpreparedbyHeathandAssociates,datedFebruary2018Exhibit7ConcurrencyTestMemorandumpreparedbyBrianneBannwarth,DevelopmentEngineeringManager,datedMarch2,2018 SUNSET AREA COMMUNITY PLANNED ACTION FINAL NEPA/SEPA ENVIRONMENTAL IMPACT STATEMENT • VOLUME 1 • APRIL 2011 Issued by: City of Renton NEPA Responsible Entity and SEPA Lead Agency Prepared in partnership with: Renton Housing AuthorityRenton Housing Authority CITY OF RENTON, WASHINGTON ORDINANCE NO. 5813 AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING ORDINANCE NOS. 5610 AND 5740, ADDING FIVE PARCELS AND REDISTRIBUTING, BUT NOT INCREASING, THE TOTAL NUMBER OF HOUSING UNITS IN THE SUNSET TERRACE REDEVELOPMENT AREA, AND REVISING A PLANNED ACTION DESIGNATED FOR THE SUNSET AREA PURSUANT TO THE STATE ENVIRONMENTAL POLICY ACT(SEPA). THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES ORDAIN AS FOLLOWS: SECTION I. Findin s. The Council finds as follows: A. The City is subject to the requirements of the Growth Management Act, RCW 36.70A ("GMA") and is located within an Urban Growth Area; B. The City has adopted a Comprehensive Plan complying with the GMA, and has amended the Comprehensive Plan to address transportation improvements and capital facilities specific to the Sunset Area; C. The City has adopted a Community Investment Strategy, development regulations, and design guidelines specific to the Sunset Area, as designated in Attachment A, which will guide growth and revitalization of the area, including the Sunset Terrace public housing redevelopment area identified in Attachment C; D. The City has prepared an Environmental Impact Statement (EIS) for the Sunset Area, supplemented by addenda, that addresses the probable significant environmental impacts associated with the location, type, and amount of development anticipated in the Planned Action area; 1 41° 01' 40"295.00'NE10° 23' 13"11.74'NE79° 09' 57"51.77'SE0° 34' 38"289.98'S E 67° 02' 29"52.62'SW0° 18' 30"41.86'S E 88° 58' 08"168.16'NW3° 38' 16"125.63'NE(E) LIBRARY BUILDING6,160 SF(E) PARKINGPARCEL # 722780-204061,133 SF (1.40 ACRES)ZONING = R-141234567891011121314151617181920212223242526722780-1776ZONE: CV722780-1655ZONE: R-14 722780-1651ZONE: R-14722780-1645ZONE: R-14722780-1715ZONE: R-14722780-1710ZONE: R-14722780-1705ZONE: R-14722780-1700ZONE: R-14722780-1685ZONE: R-14NE 12TH STREETROW WIDTH = 50'-0"OUTLINE OF ROOF ABOVE7'-7 3/4"20'-8 5/8"72'-0 1/2"5 2 '-1 0 3 /8 "TYP9'-0"13'-4 3/4"12'-0"8'-0"108'-0"4'-8 1/4"12'-9 3/4"6'-0"3'-2 7/8"6'-0"18'-0"26'-0"18'-0"16'-7 5/8"8'-6" 7'-0" 8'-6"45'-2"48'-0"12'-0"53'-2"36'-0"57'-2"16'-0"33'-2"10'-10"37'-2"(E) STREET LIGHT, TYP(E) BENCH(E) SCULPTURE(E) BENCH(E) BIKE RACK(E) CHAIN-LINK FENCE, TYP(E) DUMPSTER AREA89° 25' 21"41.14'SW(E) GATE(E) CHAIN-LINK FENCE1720 12th AvenueSeattle, WA 98122CONTACT: Grace Kim, AIAv (206) 285.1589e grace@schemataworkshop.comCopyright Schemata Workshop, Inc.1234512345DCBADCBAarchitectSchemata Workshop, Inc.ownerRenton Housing AuthorityAuthor:Checker:2900 NE 10th StRenton, WA 98056CONTACT: Mark Gropperv (425) 226.1850CITY OF RENTON STAMPArchitect Project No:NOTE: FULL SCALE SHEET SIZE IS 22" X 34"2/9/2018 1:12:51 PMA002SITE PLAN1604SUNSETMULTI-SERVICE& CAREERDEVELOPMENTCENTER2902 NE 12th StreetRenton, WA 98056CONDITIONAL USE PERMIT2/9/18JW, CP, SHGK 1" = 20'-0"A3SITE PLANNO DATE DESCRIPTION WH1EA75432CDB692'-0"80'-0"A201A3A201B4COUNSELING ROOM 1CLASSROOM 2CLASSROOM 1 STORAGE MECHANICAL MEETING ROOM SITE COORDINATOR/RECEPTIONFLEX SPACE/CHILDCAREOFFICE WCWCSTORAGEMANAGERCOMPUTER LAB STORAGE MAINTENANCEGLASS FOLDING OR SLIDING WALLRELITE ABOVECOUNSELING ROOM 2NEW HARDWARE IN (E) DOORNEW HARDWARE IN (E) DOOR12'-0"52'-0"16'-0"36'-0"56'-0"A201B1A201D2(E) WINDOWS AT 12'-1 1/2" A.F.F.(E) WINDOWS AT 10'-0" A.F.F.(E) WALL TO REMAIN LEGENDNEW WALL 1720 12th AvenueSeattle, WA 98122CONTACT: Grace Kim, AIAv (206) 285.1589e grace@schemataworkshop.comCopyright Schemata Workshop, Inc.1234512345DCBADCBAarchitectSchemata Workshop, Inc.ownerRenton Housing AuthorityAuthor:Checker:2900 NE 10th StRenton, WA 98056CONTACT: Mark Gropperv (425) 226.1850CITY OF RENTON STAMPArchitect Project No:NOTE: FULL SCALE SHEET SIZE IS 22" X 34"2/9/2018 1:12:58 PMA101FLOOR 1 PLAN1604SUNSETMULTI-SERVICE& CAREERDEVELOPMENTCENTER2902 NE 12th StreetRenton, WA 98056CONDITIONAL USE PERMIT2/9/18JW, CP, SHGK 1/8" = 1'-0"A3FLOOR 1 PLAN - OPTION BNO DATE DESCRIPTION RHA MULTI-SERVICE CENTER TRIP GENERATION AND ASSESSMENT – LEVEL 1 TABLE OF CONTENTS 1. Project Description ......................................................................................................3 2. Existing Conditions ......................................................................................................3 3. Future Traffic Conditions .............................................................................................8 4. Summary .....................................................................................................................10 Appendix LIST OF TABLES 1. Bus Routes ..................................................................................................................7 2. Project Trip Generation ...............................................................................................8 LIST OF FIGURES 1. Vicinity Map & Roadway System .................................................................................4 2. Site Plan ......................................................................................................................5 2 RHA MULTI-SERVICE CENTER TRIP GENERATION AND ASSESSMENT – LEVEL 1 1. PROJECT DESCRIPTION This report summarizes anticipated traffic impacts related to the proposed RHA Multi- Service Center project in the City of Renton. The project consists of using an existing 6,160 square foot building which was previously occupied by the Renton Highland Library and converting into a multi-service and career development center. The project site is located on the north side of NE 12th Street on parcel number 722780-2040 and comprises approximately 1.4 acres. Access and parking configuration is proposed to remain via one eastern ingress and one western egress and offers 26 on-site parking stalls. Surrounding development consists of commercial uses to the east and a mixture of residential and local school uses in the remaining areas. Figure 1 on the following page shows the general site location and roadway network serving the vicinity. A site plan for of the project is given on Figure 2. 2. EXISTING CONDITIONS 2.1. Existing Roadway Characteristics The street network serving the proposed project consists of a variety of roadways including SR-900 to the east and local residential streets. Characteristics for these roadways vary with respect to lane widths, grades, speeds, and function. The major roadway bordering and providing access to the site is listed and described below. NE 12th Street.: is an east-west, two-lane collector that borders the south side of the project site. The total width of the roadway near the project is approximately 38 feet and includes on-street parking along either side. A posted speed limit of 25 mph in conjunction with a school speed limit of 20 mph when children are present is found directly west of the site. Complete curb, gutter, and sidewalk are offered along both sides of the roadway from Lynwood Avenue NE to Dayton Place NE. 3 4 5 2.2. Non-Motorist Traffic The surrounding vicinity currently offers non-motorist facilities in the form of complete sidewalk networks and marked pedestrian crossings on the primary NE 12th Street roadway. ADA accessible ramps with detectable truncated domes were identified at the nearby intersections. Complete sidewalk paths are also available to the nearby transit routes which are discussed below. No safety issues to pedestrian traffic are anticipated. 2.3. Transit Service A review of the Metro Transit System indicates that transit service is provided in the vicinity. A summary of the closest routes and approximate walking distance is provided in Table 1 below. Table 1 Bus Routes Route Description Weekday Service Weekend Nearest Stop 105 Renton Highland to Renton TC 4:30 AM – 11:20 PM 30 minute headways 6:20 AM – 11:30 PM 60 minute headways 450’ west 111 Maplewood to Lake Kathleen to Downtown Seattle 7:20 AM – 11:20 PM 60 minute headways N/A 700’ east 240 Bellevue TC to Renton TC 5:00 AM – 11:50 PM 30 minute headways 7:00 AM – 11:50 PM 30 minute headways 1000’ southeast As shown from the table above, multiple frequent transit routes are available within walking distance to the project site. Complete sidewalk networks with marked crosswalks at major crossings are offered leading to each bus stop. Given the nature of the project and proximity to nearby bus stops, public transit is anticipated to be utilized. Refer to the Metro Transit System schedule for detailed Route information. 2.4. Access Driveway Safety Access to the site is proposed to remain via one inbound only and one outbound only configuration (see Figure 2). Assessments of driveway sight distance were analyzed to determine if available visibility meets standards needed to ensure project traffic can safely exit the site and enter NE 12th Street. Sight distance requirements are based on AASHTO’s Green Book (2011) standards. Based on the 25 mph posted speed limit on NE 6 12th Street, 240 and 280 feet of unobstructed sight distance are needed for outbound right- and left turn movements, respectively. Preliminary measurements at the outbound access location indicate sight distance requirements are met with lines of sight exceeding 300 feet in either direction. No safety issues are identified with the continued use of the existing access location. 2.5. Roadway Improvements A review of the City of Renton’s 2018-2023 Six-Year Transportation Improvement Program indicates improvement projects are planned in the vicinity. A summary of the nearest project descriptions are provided below. NE Sunset Boulevard (SR 900) Corridor Improvements (TIP No. 15) This scope of this project intends to perform a number of improvements to the SR-900 corridor starting from I-405 to the west and ending at the City of Renton limits to the east. The total length is approximately 3.0 miles. Improvements consists of lane channelization, traffic signal modification, access management, among others. Pedestrian, transit, and bicycle needs will also be addressed. The design of the project is 30 percent complete and has an estimated cost of $33,125,833. The project is not fully funded at this time. Sunset Area Green Connections (TIP No. 16) This scope of this project intends to construct multi-modal improvements to a number of residential roadways located in the Sunset Area Community. These roadways are planned to be widened, extended, and/or realigned and improve pedestrian mobility. Roadways included are NE 10th Street, NE Sunset Lane, Harrington Avenue NE, NE 12th Street, Edmonds Avenue NE, Jefferson Avenue NE, Kirkland Avenue NE, and Glennwood Avenue NE. The project has an estimated cost of $22,200,000 and is currently not fully funded. 7 3. FUTURE TRAFFIC CONDITIONS 3.1. Trip Generation Trip generation is used to determine the magnitude of project impacts on the surrounding street system. This is denoted by the quantity or specific number of new trips that enter or exit a project during a designated time period, such as a specific peak hour or an entire day. As the site has previously been used as a library, the goal of the analysis is to determine the estimated net difference in traffic subsequent to the RHA Multi-Service Center buildout. Trip generation data for the library use was obtained from the Institute of Transportation Engineer's (ITE) publication Trip Generation, 10th Edition. ITE has no defined use that reflects the proposed project so trips are estimated using employee count, hours of operations, and services provided. Proposed Use: The project is a multi-service career development and social center providing services such as job training assistance, ESL and other adult education classes to individuals or small groups. The project proponent indicates that no more than 20 clients a day are anticipated during the Monday through Friday, 8:00 AM to 5:00 PM hours of operations. Additionally, the building will staff 12 full-time employees. As services provided are generally held midday, the AM and PM peak hour will primarily constitute employee trips. Table 2 below summarizes and compares peak hour trips from the proposed library using ITE Library (LUC 590) data and estimated project trips. Assuming 1 employee translates to 1 inbound trip for the AM and 1 outbound trip in the PM, total trips are calculated at 12 inbound AM peak hour trips and 12 outbound PM peak hour trips. 6 miscellaneous trips were included in the PM peak hour to reflect potential clients (3 in/3 out). The average daily traffic (ADT) was estimated to be ten times the total PM peak hour trips. Table 2 Project Trip Generation Land Use Size (th.sq.ft) ADT AM Peak-Hour Trips PM Peak-Hour Trips In Out Total In Out Total Existing Library 6.16 444 2 4 6 24 26 50 Proposed Service Center 6.16 180 0 12 12 3 15 18 Net New -264 -2 8 6 -21 -11 -32 8 Based on Table 2, the proposed multi-service center is anticipated to generate significantly less traffic than the previous library use. The AM peak hour is anticipated to increase by 6 AM peak hour trips due to employee count; ADT and PM peak hour trips are significantly lower. 3.2. Parking The existing site offers 26 parking stalls (including 2 ADA stalls) and will remain unchanged. Given the anticipated reduced use with respective to vehicular demand, the 26 parking stalls are anticipated to adequately support the project’s parking demands. For reference, the 85th percentile peak parking demand for a library based on ITE’s Parking Generation, 4th Edition is 4.19 vehicles per 1,000 square foot. Applying ITE’s demand to the previous library is as follows: 4.19 vehicles x 6,160 s.f. = 25.8 or 26 stalls Given that the existing parking lot adequately supports a more intense use, the 26 stalls are anticipated to meet project demands. A library attracts many more than the approximate 20 visitors per day the multi-service center would serve. Moreover, the services provided will be scheduled sequentially throughout the day and are targeted towards individuals or small groups. As such, not all 20 visitors will arrive simultaneously but rather throughout the business operating hours. Assuming each employee occupies a stall, 14 unoccupied stalls will be available for clients (26 stalls less 12 employees = 14 open stalls). The proximity to local transit in conjunction with complete sidewalk networks may also encourage other modes of transportation. As indicated in Section 2.3 Transit Service, three bus routes are available in walking distance to the site with frequent service. Furthermore, the vicinity allows on-street parking opportunities along either side of the roadway in the unlikely event should spillover parking ever occur. 9 4. SUMMARY The RHA Multi-Service Center project plans on using the old 6,160 square foot library building in the City of Renton to convert into a social service hub. The project site is located on the north side of NE 12th Street on parcel number: 722780-2040. Provided services include, but not limited to, job training assistance, ESL classes, and other adult education opportunities targeted to individuals or small groups. The overall site and access configuration is proposed to remain via one easterly inbound entrance and one westerly outbound entrance. Public transit routes are offered within walking distance to the site with complete sidewalk networks. The traffic generated from the proposed project was estimated using employee count, hours of operation, and services provided given the unique use with limited comparable ITE data. The project overall is anticipated to generate significantly less traffic than the previous library use. A trip generation summary is provided in Table 2. Similarly, the parking demand is anticipated to be adequately met with the existing 26 on-site parking stalls. Based on the analysis provided, no off-site mitigation is identified at this time. 10 RHA MULTI-SERVICE CENTER TRIP GENERATION AND ASSESSMENT – LEVEL 1 APPENDIX 11 1/23/2018 https://itetripgen.org/PrintGraph.htm?code=590&ivlabel=QFQAF&timeperiod=AWDVTE&x=6.16&edition=385&locationCode=General Urban/Su… https://itetripgen.org/PrintGraph.htm?code=590&ivlabel=QFQAF&timeperiod=AWDVTE&x=6.16&edition=385&locationCode=General%20Urban/Subur…1/1 Library (590) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday Setting/Location: General Urban/Suburban Number of Studies: 6 Avg. 1000 Sq. Ft. GFA: 16 Directional Distribution: 50% entering, 50% exiting Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate Range of Rates Standard Deviation 72.05 57.30 - 78.80 7.34 Data Plot and Equation T = Trip EndsX = 1000 Sq. Ft. GFA Study Site Average RateFitted Curve Fitted Curve Equation: Ln(T) = 0.99 Ln(X) + 4.28 R²= 0.97 Trip Generation Manual,10th Edition Institute of Transportation Engineers 0 5 10 15 20 25 300 500 1,000 1,500 6 444 437 12 1/23/2018 https://itetripgen.org/PrintGraph.htm?code=590&ivlabel=QFQAF&timeperiod=TASIDE&x=6.16&edition=385&locationCode=General Urban/Sub… https://itetripgen.org/PrintGraph.htm?code=590&ivlabel=QFQAF&timeperiod=TASIDE&x=6.16&edition=385&locationCode=General%20Urban/Suburb…1/1 Library (590) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies: 4 Avg. 1000 Sq. Ft. GFA: 19 Directional Distribution: 71% entering, 29% exiting Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate Range of Rates Standard Deviation 1.00 0.52 - 1.33 0.30 Data Plot and Equation Caution – Small Sample Size T = Trip EndsX = 1000 Sq. Ft. GFA Study Site Average RateFitted Curve Fitted Curve Equation: T = 1.75(X) - 14.59 R²= 0.86 Trip Generation Manual,10th Edition Institute of Transportation Engineers 0 5 10 15 20 25 300 5 10 15 20 25 30 6 6 13 1/23/2018 https://itetripgen.org/PrintGraph.htm?code=590&ivlabel=QFQAF&timeperiod=TPSIDE&x=6.16&edition=385&locationCode=General Urban/Sub… https://itetripgen.org/PrintGraph.htm?code=590&ivlabel=QFQAF&timeperiod=TPSIDE&x=6.16&edition=385&locationCode=General%20Urban/Suburb…1/1 Library (590) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location: General Urban/Suburban Number of Studies: 9 Avg. 1000 Sq. Ft. GFA: 15 Directional Distribution: 48% entering, 52% exiting Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate Range of Rates Standard Deviation 8.16 4.00 - 12.25 2.52 Data Plot and Equation T = Trip EndsX = 1000 Sq. Ft. GFA Study Site Average RateFitted Curve Fitted Curve Equation: T = 9.33(X) - 17.13 R²= 0.75 Trip Generation Manual,10th Edition Institute of Transportation Engineers 0 5 10 15 20 25 300 100 200 300 6 50 40 14 14 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: March 2, 2018 TO: Matt Herrera, Senior Planner FROM: Brianne Bannwarth, Development Engineering Manager SUBJECT: Traffic Concurrency Test – Sunset Multi-Service Center; LUA18-000127, CU-H The applicant is requesting a Hearing Examiner Conditional Use Permit approval to locate the proposed Sunset Multi-Service and Career Development Center. The subject property and building is the site of the former Sunset Neighborhood Library located at 290 2 NE 12th St that was recently acquired by the Renton Housing Authority (RHA). The project site is located within the Residential-14 (R-14) zone. The existing 6,160 square foot building is located on a 1.4 acre lot. No exterior site construction improvements or building additions are proposed. Proposed interior improvements would support multiple services such as job training assistance, ESL and adult education classes, and potentially a foodbank. While the property is owned by the RHA, the regional non-profit Neighborhood House would manage the proposed service center. Access to the site will remain in the existing locations along NE 12th St. The subject property contains 26 parking spaces. The proposed development would generate a decrease of approximately 264 net new average weekday daily trips. During the weekday AM peak hour, the project would generate approximately 6 net new trips (4 inbound and 2 outbound). During the weekday PM peak hour, the project would generate a decrease of approximately 32 net new trips (-15 inbound and -17 outbound). The proposed project passes the City of Renton Traffic Concurrency Test per RMC 4- 6-070.D as follows: Transportation Concurrency Test – Sunset Multi-Service Center Page 2 of 3 March 7, 2018 Traffic Concurrency Test Criteria Pass Implementation of citywide Transportation Plan Yes Within allowed growth levels Yes Project subject to transportation mitigation or impact fees No Site specific street improvements to be completed by project No Traffic Concurrency Test Passes Evaluation of Test Criteria Implementation of citywide Transportation Plan: The City’s investment in completion of the forecast traffic improvements is 130% of the scheduled expenditure through 2017. Within allowed growth levels: As shown on the attached citywide traffic concurrency summary, the calculated citywide trip capacity for concurrency with the city adopted model for 2017 is 2,078 trips, which provides sufficient capacity to accommodate a decrease of 32 trips from this project. A resulting 2,110 trips are remaining. Project subject to transportation mitigation or impact fees: The project will be subject to transportation impact fees at time of building permit for the project. Site specific street improvements to be completed by project: The project will be required to complete all internal and frontage street improvements for the building prior to occupancy. Any additional off-site improvements identified through SEPA or land use approval will also be completed prior to final occupancy. Background Information on Traffic Concurrency Test for Renton The City of Renton Traffic Concurrency requirements for proposed development projects are covered under Renton Municipal Code (RMC) 4-6-070. The specific concurrency test requirement is covered in RMC 4-6-070.D, which is listed for reference: D. CONCURRENCY REVIEW PROCESS: 1. Test Required: A concurrency test shall be conducted by the Department for each nonexempt development activity. The concurrency test shall determine consistency with the adopted Citywide Level of Service Index and Concurrency Management System established in the Transportation Element of the Renton Comprehensive Plan, according to rules and procedures established by the Department. The Department shall issue an initial concurrency test result describing the outcome of the concurrency test. Transportation Concurrency Test – Sunset Multi-Service Center Page 3 of 3 March 7, 2018 2. Written Finding Required: Prior to approval of any nonexempt development activity permit application, a written finding of concurrency shall be made by the City as part of the development permit approval. The finding of concurrency shall be made by the decision maker with the authority to approve the accompanying development permits required for a development activity. A written finding of concurrency shall apply only to the specific land uses, densities, intensities, and development project described in the application and development permit. 3. Failure of Test: If no reconsideration is requested, or if upon reconsideration a project fails the concurrency test, the project application shall be denied by the decision maker with the authority to approve the accompanying development activity permit application. The Concurrency Management System established in the Transportation Element on page XI -65 of the Comprehensive Plan states the following: Based upon the test of the citywide Transportation Plan, consideration of growth levels included in the LOS-tested Transportation Plan, payment of a Transportation Mitigation Fee, and an application of site specific mitigation, development will have met City of Renton concurrency requirements.