HomeMy WebLinkAboutRES 4532CITY OF RENTON, WASHINGTON
RESOLUTION NO. 4532
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AMENDING THE
2023/2024 CITY OF RENTON FEE SCHEDULE.
WHEREAS, on November 23, 2009, the Council adopted Ordinance No. 5509, which
removed many fees from the Renton Municipal Code and consolidated them into the 2010 City
of Renton Fee Schedule brochure, which has been subsequently amended; and
WHEREAS, on November 14, 2022, the City Council passed Resolution No. 4484, adopting
an amended fee schedule for 2023 and 2024; and
WHEREAS, the fee schedule for 2023 and 2024 was subsequently amended by Resolution
Nos. 4492, 4501, 4513 and 4526; and
WHEREAS, it is necessary to approve an amended fee schedule to make periodic updates
as part of the City's 2"d Quarter Budget amendment;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS:
SECTION I. The fee schedule is amended and replaced with the 2023-2024 City of
Renton Fee Schedule brochure, which is attached hereto and adopted by this reference ("Fee
Schedule"). An updated copy of the Fee Schedule shall at all times be filed with the City Clerk as
required by Ordinance No. 5509.
SECTION II. The amended Fee Schedule adopted by Section I of this resolution shall be
effective on July 22, 2024 and thereafter act as the City of Renton's Fee Schedule for all fees or
changes referenced therein. The Fee Schedule shall remain in effect until amended or otherwise
1
RESOLUTION NO. 4532
replaced by the City Council. In the event the Fee Schedule is not amended prior to the year 2025,
the fees specified for the year 2024 shall continue to apply into and beyond 2025 until amended by
the City Council.
PASSED BY THE CITY COUNCIL the 8th day of July 2024.
APPROVED BY THE MAYOR this 8th
Approved as to form:
Shane Moloney, City Attorney
RES-FI N:24RES015:06/10/2024
2
day of July 2024.
Art5ddlavone, Mayor
* = SEAL
s��Ky09p���'��u�n���a�`��`
0N TE D� SE?
�
City of Renton Fee Schedule
2023-2024
2023-2024"
U y of Renton Fee Schedule
Rev. May 2024
City of Renton Fee Schedule
2023-2024
Table of Contents Page
SECTION I. MISCELLANEOUS FEES
1
SECTION II. MAPLEWOOD GOLF COURSE
2
SECTION III. CITY CENTER PARKING FEES
2
SECTION IV. AQUATIC FEES
3
SECTION V. CARCO THEATER (REPEALED)
3
SECTION VI. PARKS AND FACILITIES USE AND RENTAL
3
SECTION VII. COMMUNITY CENTER PASS CARD & FEES
4
SECTION VIII. AIRPORT CHARGES
4
SECTION IX. ANIMAL LICENSES FEES - RMC 5-4-2
4
SECTION X. BUSINESS LICENSES
5
SECTION XI. ADULT ENTERTAINMENT LICENSES
5
SECTION XII. DEVELOPMENT FEES
6
Building Fees:
6
Land Use Review Fees:
8
Site Work, Utilities, and Right of Way Fees:
10
Technology Surcharge Fee
14
Impact Fees:
14
Miscellaneous Fees:
15
SECTION XIII. FIRE DEPARMENT FIRE MARSHAL FEES (RFA)
15
SECTION XIV. MONETARY PENALTY SCHEDULE FOR INFRACTIONS ISSUED UNDER
17
THE AUTHORITY OF CHAPTER 7.80 RCW
City of Renton Fee Schedule
2023-2024
SECTION
t
I.
Maps:
a. Zoning maps -standard 11 x 17
$4
54
Is. Zoning maps -large 24 x 36
$
$
c. Comprehensive Plan map - standard 11 x 17
$4
$4
d. Comprehensive Plan map - large 24x 36
$12
$12
e. Precmct maps
55
SS
2.
Plat:
a. First page
$2
52
b. Each additional page
51
$1
3.
Photocopies:
A. Each 8.5 x 11 or 8.5 x 30
$0.15
$0 15
b. Each 11" x 17"
$0.20
$0 20
c. Each 8.5"x11"or 8.5"x14"color
$0.25
$025
4.
Budget:
a. City's Budget
$to
$10
Is. City Budget to other municipality or quasi -municipal corporation or other nonprofit charitable or education organization
N/C
N/C
S.
Audio or Video Recording Copies:
a. Audio recording, each copy
$2
$2
It. Video retarding, each copy
S2
52
6.
Regulations and Plans:
a. Comprehensive Plan and Map
$30
$30
b. Title IV, Development Regulations:
(i) text and Zoning Map
$1
$log
(ii) Text only
00 op
$t
$1m
c. Individual Chapters of Development Regulations
$10
$]0
d. Renton Municipal Code (two volumes)
$400
5400
e. Code supplements, per year:
(i( Titles l - Ill and Vl -X
570
$70
Title IV
570
$70
7.
Miscellaneous Services:
a. Certification and Notary Fees- Clerk's Certification
$to
SID
b. Notary Public Attestation or Acknowledgement or as
$to
SID
otherwise provided for in RCW 42.28,090, per signature
c. H old Harm less Agreem ents an d oth er similar documents
520
$20
not otherwise provided for
d. Lamination of licenses, pictures
56
$6
e. Community Development Block Grants(CDBG) Loan Program:
li) Application Fee
$zao
$200
Loan Origination Fee
$150 or 0.25%of loan amount,
5150 or0.25%of loan amount,
whichever is greater
whichever is greater
Closing Costs including any legal fees)
50%of total actual costs
SO%of total actual costs
8.
Miscellaneous Charges for Police Services:
a. Police Reports per page
$0
$
b. Record Checks (Written Response)
SS5
$S $5
c. Photographs - Digital on CD
$2
$2
d. Photographs - black&white or color- Cost of developing film
Cost
Cost
e. Fingerprint Cards
$5
$5
(i) Each additional card
$1
$1
9.
Charges for Fire Documents:
a. Fire reports per page
$0.15
SOAS
Is. Fire investigative report on CD
$2
52
c. First copy - black&white or color- Cost of developing film
Cost
Cost
d. Additional copy - black&white or color- Cost of developing film
Cost
Cost
10.
Computer Listings:
a. City of Renton new business list
$
0
b. List of all business licenses
S20 0
$2
c. Copies requested to he faxed, local number
$3
$3
d. Copies requested to 6e fazed, long distance number
(d Multi -family: 2 units, Duplexes, & Accessory Dwelling Unit (ADU) s
SID
sic
(ii) Six(6)or more pages (ten (10) page limit)
$20
$20
11.
Utility Fee.
a. Special Request Water Meter Reading
$30
$30
Is. Utility New Account Setup
S25
$25
c. Utility Billing Account Transfer )tenant billingform)
$5
$5
d. Water utility outstanding balance search requested by
$25
$25
fax, messenger, or letter
e Water turn off and turn on fee
$60
$60
f Water utility shutoff list processing fee
$60
$60
g Water delinquent late fee of 10% of past due charges but not less than fifty cents
10%
10%
h Water after hours service charge to turn on water after 3 p.m. (additional fee)
$90
$90
I Tenant notification fee for impending shutoff of water per tenant
$5
$5
I Petition filing fee for stormwater appeal from category determination and assessment
$75
$75
k Meter Accuracy Reading - For testing 3/4" through 2" meter
$40
540
1 Meter Accuracy Reading- For testing meters larger than 2"
Time& Materials, requires
Time& Materials, requires
a S60 refundable deposit
a $60 refundable deposit
prior to test
p c,Ip test
12
Schedule of Fines for False Alarms - Scanty/Burglar: (effective Febrwryl, 2019)
a. One-time Registration Fee
$25
$25
Is. Annual Registration Renewal
N/C
N/C
c. First False Alarm in a registration year'
N/C
N/C
d. Second False Alarm in a registration years
$100
$100
o. Third or more False Alarm in a registration year'
$250
$250
f. Late Payment Fee
525
$ 25
g. Unregistered Alarm System Fee
$SO
$5050
s A registration year shall mean January 1 thou December 31 each year.
13.
NSF Check Fees
525
$25
14.
Veteran Park Tile. Three lines
$75
S75
City of Renton Fee Schedule
2023-2024
SECTION• • ■
2023
2024
15. Electronic Records"
a. Photocopies or printed copies of electronic records, per page
$0 15
SOIS
b. Scanning paper records, per page
$0.30
$0 10
C. Electronic files or attachments u ploaded for electronic delivery(email,cloud-based data storage service, or other means of electronic
5005
$005
delivery), for each four (4) files
d. Transmission of records in an electronic format or for the use of agency equipment to send the records electronically, per gigabyte (GB)
$010
5010
e. Body worn camera footage redaction, per minute of documented staff time, plus other documented costs of redact on
$0 64
50 64
' The charges identified in RCW 4256.120(31(b) (and referenced above) may be combined to the extent that more than one type of charge applies to copies produced In response to a
request. The
particular
actual cost of any digital storage media or device provided by the agency. Alternatively, the City may charge a Rat fee of up to $2 for the entire request as long as the cost of uploading and trans mixing the
electronic records is reasonably estimated to equal or exceed that amount. Only one $2 Rat fee per request is authorized for electronic records produced in Installments. When records
are provided electronically
on a CO, DVD, thumb drive, flash drive, or other electronic device, the requestor will be charged for the cost of the electronic storage device. The City may charge an actual-com service charge for requests that
require use of IT expertise to prepare data compila tons or provide customized electronic access services when not used by the City for other purposes. A cost estimate and explanation will be provided to the
requester before incurring the costs.
' Option to waive charges. The City may waive charges associated with fulfilling a request. The decision will be based on various factors, including the volume and format of the responsive documents, The
decision to assess fees for full a public records request shall be made on a consistent and equitable basis, dependent primarily upon the amount
of stall time required for copying, scanning, shipping,
uploading, and/or transmitting the records associated with fulfilling a request.
' Certified copies. If the requestor Is seeking a certified copy of a City record, an additional charge of $2.00 per each complete document maybe applied to cover the additional expense
and time required for
certification.
16. Document Recording Fees:
a. The applicant shall pay all document recording fees charged by King countyand all administrative fees charged by the title company for
Actual Casts
Actua Costs
processing. Payment in full shall by submitted to the City before documents are sent for recording,
b. Miscellaneous charges associated with documentrecording such as courier fees
Actual Costs
Actual Costs
17. Publication Fees:
The applicant shall pay all Publication fees charged by publication outlet used by the Clty (The Seattle Times or equiva ent) Payment in full shall be
Actual Costs
Actual Costs
made to the City prior to public hearing permit approval or issuance whichever comes first
Should Section I fees due total less than 54.00 and no other fee is due to the City at the same time, the department administrator may authorize to waive the entbe amount due at their discretion.
�5tCTION 11, MAPLEWOOD GOLF COURSE
1. Green Fees:
2023
2024
a. Weekday:
(1) 18 Hale
$43
$43
IS) 9 Hole
$ 32
$34
(111) 18 Hole, Senior
4
$
(N) 9 Hole, Senior
$26
26
$26
1v) 18 Hole, Junior
S2
$2
(vl) 9 Hole, Junior
S19
$20
b. Weekend
(i) 18 Hole
$
$
(ii) 9 Hole
$32
$3355
For purposes of this section, "weekend" shall mean Friday, Saturday, and Sunday. "Weekday" shall mean the remaining four days of the week.
"Junior' shall mean ages 17 and under, "Smi l'shall mean
ages 62 and over.
OH -season and promotional rates determined by management; posted on website.
2. Club Rental:
a. Regular
S30
$35
b. Premium
$60
$65
3. Golf Cart Fees.
a. 18 Hole
$36
$38
b. 18 Hole Single Rider
52
$2
c. 9 Hole
$24
$26
d. 9 Hole Single Rider
$18
$18
e. Trail Fee
$15
S15
I. Half Cart, 18 Hole
$18
$19
g. Half Cart, 9 Hole
512
S13
4. Whiling Range Fees:
a. Large Bucket
$13
$14
b. Small Bucket
S10
$11
C. Warm-up Bucket
$6
$7
S. lesson Fees:
a, 112 Hour rivate
b. 1 Hour Private
S 55 55
$80
$6S6 0
0
c. 1/2 Hour Series Private
$
$220
d. 1 Hour Series Private
5300
e. Group Series
$140
$160
160
If. 1/2 Hour Private, tun or
$35
$40
S. Playing Leswr(3-hole minimum/9-hole maximum) per hole
525
S30
�SECTION 111. CITY CENTER PARKING FEES 2023r
1. City Center Parking Garage Fees':
Parking rates for retail parking will be as follows:
a. Zero (0)- two (2)hours N/C N/C
Is. Two (2) - four (4) hours $2 $2
c. Four (4) - six (6) hours $4 $4
d. Six (61 - (10) h— rs 56 $6
e. 10 hour: or more $10 $lo
I. Monthly pass -holders, tax included $35 S35
s Parking garage fees for periods of up to 10 hours are waived by Ord 6131 until 12/31/2024.
City of Renton Fee Schedule
2023-2024
!SECTIONa
r
1. Admission forthe Aquatic Centershall beesfoliows:
a. Regular Session
IQ Infants -under 1 year
N/C
N/C
(il) Youth - 1 to 4 years
58
$8
(III) Ages S and up
$16
516
(iv) Lap swim - water wa king tinny
SS
$7
(y) Locker Rental
5025
$025
Is. Canopy Rental Fees' (includes can opy and admission for one leisure swim seas on)
(I) Henry Moses Party Tent 41
(IV x 20' far up to twenty-five guests on wave pool)
(1) Resident Rate, per session
$600
5600
(2) Non-resident Rate, per session
$700
$7D0
fill Henry Moses Party Tent 42
(10' x 20' for up to twenty-five (251 guests):
(1) Resident Rate
$500
$500
(2) NomResident Rate
$600
$600
(ehl Henry Moses Party Tent 43
(10' x 10' for up to ten (10) guests(:
(1) Resident Rate, per session
$250
$250
(2) Non-resident Rate, per session
$30D
$300
c. Resident Rate all inclusive'
$3,800
$3,800
d. Non-resident Rate all inclusive'
54,800
54,800
e. Swim Lesson Program- Fees and associated descriptionsare published in the "Let's Go Renton - Renton Acbv ties Gwde
I. End -of -year School Party Rentals
0) Renton School D strict
(1) 001-299students $1,900 $1,900
(2) 300-3993tudenu $2,250 $2,250
(3) 400-499students $2,400 $2,400
(4) 500-599studeri 52,550 52,550
fill Other Schools and D striets
11) 001 - 299 students $2,450 $2,450
(2) 300-399students $2.850 $2.850
13) 400-499students $3.150 $3,150
(4) 500-S99 students $3.360 $3,360
' Sales tax not Included In the rental fee
2. Boat Launch Rates:
a. Oairy resident - 7 days a week $20 $20
Is. Daily Nam resident-7 days a week $25 $25
c. Overnight resident - 7 days a week S25 $25
d. Overnight N on-resdent - 7 days a week S45 $45
e. Annual parking boat launch permit - resident $70 $70
f. Annual parking boat launch permit -non-resident $130 $130
I. Fishing Tournaments at Coulon Beach (additional rental fee if using the Pavilion area forweigh m and or electricity at the current rental rate) per
event
(i) Resident rate $110 $110
b. Nonresident 10am-7pm
5290
$290
2. Gene Coulon Beach Park Shelters (South el, South a2 and Creeksidel Maximum of 75 people:
a. Resident 10am-7pm
$350
$1S0
b. Non-resident 10am.7pm
$290
$290
e. South Shelters 1 & 2 Resident rate
5310
5310
I. South Shelters 1 & 2 Non-resident rate
S610
$610
3. Gene Coulon Beach Park Shelters (North Shelter):
a. Resident 10ari
$200
S200
b. Non-resident loam-7pm
$360
$360
4. Basketball court at. per hour (Tournament Play Only):
a. Resident rate
$2$
$25
b. Non-resident rate
$30
$30
S. pen Space Area in t e Parks (Cascade, Teasdale,Philip Arnold, Cedar River, Earlington, Gene ou on, encoe, enny a e ions, Sunset, an
Riverview Parks):
a. Resident rate per hour
525
$25
b. Non-resident rate per hour
S30
$30
City of Renton Fee Schedule
2023-2024
a e a a
r
9.
Athletic Field Rental, Lights and Prep Fees:
Sports Held rental per hour-resden;
$30
$30
b. Sports field rental per hour-non.resident
$36
$36
c. Renton Area Youth Sports Agencies, per hour
$8
58
d. Field prep for softball/baseball -resident perocarrence
$35
$35
e. Field prep for soccer - resident peroccurrence
$50
S50
f. Custom Field prep- resident per occurrence
$300
$100
X. Field prep for softball/baseball- non-resident per occurrence
$35
$40
h. Field prep for soccer - non-resident per occurrence
$SO
S55
I. Custom Field prep - non-resident per occurrence
$IDO
$100
(. Field lights all sports . resident per hour
$30
$30
it. Field lights all sports - non-resident per hour
$36
536
10,
Banquet& Classroom Rental - Community Center& Senior Activity Center:
a. Friday evening 5 hour minimum - resident
$750
S7S0
b. Weekend Rates 10 hour minimum - resident
$1,500
S1,S00
c. Extra hours - per hour - resident
$150
5150
d. Friday 5 hour minimum -non-resident
$900
$900
e. Weekend Rates 10 hour minimum -non-resident
$1,800
$1,800
f. Extra hours - per hour - non-resident
$180
S1B0
g Banquet Room - Mon - Fri - daytime - res-clar 3 hour min hr
5300
20
Is Banquet Room -Mon-Fri-daytime-non-resident/hr3 hour m.n
$90
S
$1220
I. Damage deposit
$550
$550
1 Cancellation Fee - Less than 90 days
S550
$550
11.
Classroom and Gymnasium Rental- Renton Community Center:
a. Resident single gym athletic - per hour
550
$50
b. Nan -resident single gym athletic - per hour
$60
S60
c. Resident double gym athletic -per hour
$300
$100
J. Non-resident double gym athletic - per hour
$120
$120
e. Resident single gym non -athletic
51,000
$1,D00
I. Non-resident single gym non -athletic
$1,200
S1,200
g. Resident double gym non -athletic
$2,000
$2,000
h. Non-resident douh a gym non -athletic
$2,400
52,400
I. Carpet fee s ngle gym - resident & non- sident
$
$325
1. Carpet fee daub a gym - resident & non-revd
50
$650
$650em
50
It. C assroom resdem
$40
$40
I. C assroom Non-resident
S48
549
12.
Facility Rental- Neighborhood Center.
a. Meeting room - resident
$35
$411
b. Gymnas um -resident
S35
$40
c. Meet ng room - non-resident
$40
S48
d. Gymnasium - non-resident
$40
548
13.
Farmer's Market
a. 10x10 Lot
$40
$40
b. Ha f Lot
$20
$20
c. Appllcat on fee
S30
$30
d. Electr cal fee
$5
$5
14.
Parklet Rental,
a Parklet Rental mauding Insta lanon per Occurrence"
$500
$73/month, S876/year
' Lang -Term Right of Way Permit will he required if looted within the City Right of Way. See Section KII, Development Fees,
of the City of Renton Fee Schedule Brochure: Subsection
a of subsection 3, Site Work,
Utilities, and Right of Way Fees
' Parklet rental Is subject to sates tax
15.
Outlying Park Buildings (Tiffany Park Buliding, Kennydale Park Building, Teasdale Park Building)
a. 6-hour block - resident
$200
$200
b. 6-hour h rick - non-resident
S240
$240
c. Deposit resident & non-res dent
$250
S250
d. Non-profit fee - per hour (no depas t required)
S40
$40
16.
Renton History Museum
a Adult(18 yrs. up)
SS
to Chdd(9 yrs. 17 yrs)
S2
SECT10N
VII. COMMUNITYa, FEES
r
Fees and associated descriptions are published and available in the "Let's Go Renton" Recreation Gulde.
rre.se riv , impuunaea... m." are—J.. to ie:eme lees, mlcrocripping costs, and other out-af-pocket costs as specified In RMC &&2.
City of Renton Fee Schedule
2023-2024
SECTION X. BUSINESS LICENSES 2023 2024
a. Registration Fee
b. Appeal of Business License Decision Mill 5150
5250 $250
2. Penalties:
a. The penalty to reinstate an expired business tense tat ecn
6. The penalty far failure to pbtam a businessterse $250 $250
c. FaAure to pay the license fee within one day after the day on which a Is due and payable pursuant to subsection C7 of Chapter 5 of the AMC
shall render the business enterprise subject to a penaltycii of the amount of the license fee for the first month of the delinquency and an
additional penalty of i for each succeeding month of delinquency, but not exceeding a total penalty of iof the amount of such license Si S%-15%
fee.
,SECTIONa
2024
1 EverypersonappIingfor a adultentertain mentlker— shall paythe applkable nonrefundable applicatbnfee:
a.Adult Entenainment Business License $750 $750
b. Entertainer $75 $7s
c. Manager
d. License Replacement $75 $75
S30 $10
2. Penalties:
a. Cndl Penalty, per violation $1,ODO $1,000
Crty of Renton Fee Schedule
2023-2024
SECTION XII. DEVELOPMENT FEES 2023 2024
a. Building and Demolition Permit Fees:'
(1) Base Fee/Valuation $1.00 to $500.00
$42
$42
(III Valuation $501.00 to $2,000.00
$42 + $4,70 x each
$42+$4.70 x each
$100 value
$100 value
(iii) Valuation $2001.00 to 25,000.00
$112.57+ $21.63 x each
$112.57 + $21.63 x each
$1,000 value
$1,000 value
(iv) Valuation$25,DO1.00 to$50,000.00
$610.06 + $15.57 x each
$610.06+$15.57 xeach
$1,000 value
$1,00D value
(VI Valuation$50,001.00 to$100.000.00
$999.31 + $10.85 xeach
$999.31 + $10.85 x each
$1,000 value
$1,000 value
(vi) Valuation $100,DO1.00 to $500,000.00
$1,541.81+$8.63 x each
$1,541.81 + $8.63 x each
$1,000 value
$1,DDO value
(Vii) Val uation $SDD,001.00 to$1,D00,000.00
$4,993.81 + $7.33 x each
$4,993.91 + $7.33 x each
$1,13DO value
$1,000 value
(vili) Valuation$1,000,001.00 and up
58,659.81+$5.66 x each
$8,659.81 + $5.66 x each
$1,000 value
$1,D00 value
s This fee shall be $0 for Accessory Dwelling Units (ADUI.
b• Combination Building Permit Fees'''
(1) Plumbing up to 3,000 sq ft
$317
$317
(i i) Plumbing over 3,000 sq it
$348
$348
(iii) Mechanical up to 3,000 sq it
$254
$2S4
(iv) Mechanical over 3,DDO sq ft
$285
$285
(v) Electrical up to 3,DOO sq it
$285
$285
(vil Electrical over 3,000 sq ft
$348
$348
' This fee shall be $0 for Accessory Dwelling Units (ADU).
' Combination Building Permit fees are required for each new single family residential structure.
C. Building Plan Check Fee'
(i) Initial Building Plan Check Fee'
65%of permit fee
65%of permit fee
(if) Additional Building Plan Check Fee
50% of initial plan Check Fee
50% of initial plan Check Fee
' This fee shall be $0 for Accessory Dwelling Units (ADU).
' Building Plan Check Fee Is In addition to the building permit fees, demolition permit fees, and combination building permit fees.
The plan check fee Is equal to
65%at the building permit
fee, or the demolition permit fee, or the combination building permit fee. Includes three (3) review cycles.
d. State Building Code Fee
(I) Non-residential projects
$25
$25
(i i) Residential projects
(1) Base Residential Fee
$6.50
$6.50
(2) Each additional unit after first unit
$2
$2
e. Electrical Permit Fees':
(i) Residential Fees - Single -Familyand Duplex
(1) New Service -Single Family and Duplex'
lal upt0200AMP
$269
$269
(b) Over 200 AMP
$285
$285
(2) Service Changes/NewCircuits -Single Family and Duplex
(a) Change up to 200 AMP
$209
$209
(b) Change over 200 AMP
$221
$221
(c) Any new circuits added to above price is per each up to a maximum of $80.00
$26
$26
(d) Minimum fee for remodel/addition of new circuits without a service charge
$209
$209
(e) Cooling system circuit for new or replaced appliance
$93
$93
(if) Multi -Family, Commercial and Industrial Fees: Fees based an value of work.
(1) $1.00to$500.00
$82
$82
(2) $500.01to$1,000.00
$82+4.99%of value
$82+4.99%of value
(3) $1,000.01 to 5,000.00
$106.45 + 4.93% of value
$1D6.45+4.93%of value
Mult$5,000.01 to$50,000.00
$303.78 + 2.58% of value
$303.78 + 2.58% of value
(5) $50,000.01to$250,000.00
$1,463.10 + 1.7D% of value
$1,463.10 + 1.70% of value
(6) $250,000.D1to$1,000,000.00
$4.870.92 + 1.45% of value
$4,970.92 + 1.45% of value
(7) $1,D00,000.01 and up
$15,775.97 + 0.53% of value
$15,775.97 + MS3% of value
(111) Temporary Electrical Services
$209
$209
(IV) Miscellaneous Electrical Fees
(1) lob Trailers
$209
$209
(2) Signs per each
$209
$209
(3) Mobile Homes
$209
$209
(4) Low Voltage Work (e.g., alarm systems; thermostats; computer, data, or phone lines; fiber optics, cable
50% of commercial fees
SO%of commercial fees
television, etc.)
Minimum $209
Minimum $209
(5) Residential Photovoltaic (PV) Solar Panel
(a) Review Fee
5135
$135
(h) Permitfee
$209
$2119
' This fee shall be $0 for Accessory Dwelling Units (ADUI.
' Exemption: Residential telephone communication systems, thermostats, securlty systems, and cable television Installations are exempt from fees
f- House Moving'- minimum per hour Inspection Fee
$190
$190
' This covers only the Building Section Inspection of the structure prior to move. There Is a separate additional fee charged by the Public Works Department to cover
the actual house move
permit. A building permit Is also required in order to site the structure on the new site.
g. Inspection Fee For Condominium Conversions
$190 on 1st unit / $24 each
$190 on Ist unit / $24 each
add') unit
add'I unit
City of Renton Fee Schedule
2023-2024
SECTIONDEVELOPMENT (CONTINUED 2023 2024
1. Building Fees: (Continued)
h. Manufactured/Mobile Home Installation Fees`
(i) Within a manufactured home park $190 $190
(ii) Outside of a manufactured home park Building Permit Fees Building Permit Fees
`Includes plan review and Inspection fees for the foundation (electrical, plumbing, mechanical, sewer and water connection fees are in addition to the below amountsi.
I• Mechanical Permit Fees:`
(i) Residential- Mechanical Permit base fee plus itemized fees below:
$65
$65
(1) Heating system (furnace, heat pump, suspended heater, fireplace, wood stove, etc.). A/C system (air
$26
$26
conditioner, chiller or Air Handling Unit (VAV) including ducts and vents)
12) Boiler or Compressor
$26
$26
(3) Appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for
$26
526
which no other fee is listed in this code
(4) Ventilation/exhaust fan
$26
$26
(5) Fuel Gas Piping (each gas piping system up to 6 outlets)
$26
$26
(i i) Commercial or Multi -Family - Mechanical Permit base fee plus itemized fees below:
$96
$96
(1) Heating system (furnace, heat pump, suspended heater, fireplace, wood stove, etc.). A/C system (air
$45
545
conditioner, chiller or Air Handling Unit (VAV) including ducts and vents)
(2) Boiler or Compressor
$96
$96
(3) Refrigeration System
$96
$96
(4) Commercial Hood: Installation of each served by a mechanical exhaust, including the ducts for such hood each
$96
$96
(5) Incinerator: Installation orrelocation ofeach
5127
$127
(6) Appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for
$45
$45
which no other fee is listed in this code
(7) Fuel Gas Piping (each gas piping system up to 6 outlets)
$45
$45
` This fee shall be $0 for Accessory Dwelling Units (AOUI.
Plumbing Permit Fees:`
(i) Residential - Plumbing Permit base fee plus itemized fees below:
$65
$65
(11 Per plumbing fixture (e.g., sink, shower, toilet, dishwasher, tub, etc.1 or set of fixtures on one trap
$12
$12
(2) Water Service: For meter to house
$12
$12
(3) Per fixture for repair or alteration of drainage orvent piping
$12
$12
(4) Per drain for rainwater systems
$12
$12
(5) Per lawn sprinkler system, Includes backfiow prevention
$12
$12
(6) Per vacuum breaker or backfiow protection device on tanks, vats, etc.
$12
$12
(7) Per interceptor for industrial waste pretreatment
$12
$12
(8) Fuel Gas Piping: (each gas piping system up to 6 outlets)
526
$26
(f) Commercial or Multifamily: Plumbing Permit base fee plus itemized fees below:
$96
$96
(1) Per plumbing fixture (e.g., sink, shower, toilet, dishwasher, tub, etc.) or set of fixtures on one trap
$19
$19
(2) Water Service: For meter to building
$19
$19
(3) Per fixture for repair or alteration of drainage or vent piping
$19
$19
14) Per drain for rainwater systems
$19
$19
(5) Per lawn sprinkler system, Includes backfiow prevention
$19
$19
(6) Per vacuum breaker or backflow protection device on tanks, vats, etc.
$19
$19
(7) Per interceptor for industrial waste pretreatment
$19
$19
(8) Fuel Gas Piping: (each gas piping system up to 6 outlets)
$33
$33
(9) Medical Gas Piping: (each gas piping system up to 6 outlets)
$96
$96
` This fee shall be $o for Accessory Dwelling Unfits (AOU).
c. Sign Permit Fees:
(I) Permanent Signs:
(1) Roof, projecting, awning, canopy, marquee, and wall signs
$317
$317
(2) Freestanding ground and pole signs
$317
$317
(ill Temporary and Portable Signs:
(1) Real Estate Directional Signs, pursuant to RMC 44-100)2, permit valid for a 12-months period
$96
$96
(2) Grand Opening Event Signs, pursuant to RMC 44-10(b6dji)
$96
$96
(3) Event Signs, pursuant to RMC 4-4-100J6d(ii) and (iii) per sign, per promotion
$63
$63
(41 A -Frame Signs, pursuant to RMC 4-4-100J5 Charge is for the first sign, all subsequent signs are 550 DO
$158
$158
(5) Commercial Property Real Estate Banner each sign permit is valid for 12 months.
$96
$95
(6) Decorative Flags fee is per entrance and valid until Rag(s) are removed
$96
$96
Miscellaneous Fees:
(I) Inspection Fees:
(1) Minimum Housing Inspection
$158
$158
(2) WABO- Adult Family Home; Misc building inspection
$158
$158
(3) Reinspection Fee; Misc building inspection
$158
$158
(4) After hours inspection'
$175/hr
$175/hr
(ill Plan Review Fees:
(I) Electrical, Plumbing, or Mechanical Permits (percentage of permit fee)
40%
40%
(2) Additional Plan Review Fees Over three review cycles (percentage of plan review fee)
SO%
50%
(3) Miscellaneous Plan Review hourly fee.
$158/hr
$158/hr
(4) Site Plan/Zoning Review
5%of Permit Fee
5%of Permit Fee
(5) Engineering Review
5%of Permit Fee
5%of Permit Fee
(III) Work commencing before permit Issuance: Where work for which the permit is required is started prior to
2 X Permit Fee
2 X Permit Fee
obtaining the permit, a special investigation fee in an amount equal to twice the permit fee shall be charged. The
special investigation fee shall be paid in addition to the required permit fees.
' This fee shall be $o for Accessory Dwelling Units (ADU).
' Applies to inspection performed on Saturdays, Sundays, observed City of Renton holidays, and non -holiday Monday -Fridays
outside the hours of 7:00AM to 3:30PM
City of Renton Fee Schedule
2023-2024
SECTIONDEVELOPMENT
FEES (CONTINUED)e
2. Land Use Review Fees:
a. General Land Use Review':
ji)
Additional Animals Permit
$56
$56
(i 1)
Address Change
$120
$120
(iiij
Annexation:
(1) Less than 10 acres
$5,900
$5,900
(2) 10 acres or mare
$5,900
$5,900
(iv)
Appeal of:
(1) Hearing Examiner's Decision
$560
$560
(2) Administrative Decision
$560
$550
(3) Environmental Decision
$560
$560
(v)
Binding Site Plan
(1) Preliminary
$2,965
$2,965
(2) Final
$5,930
$5,930
(VI)
Code Text Amendment
(vill
Comprehensive Plan Map or Text Amendment (each)
$5,900
$5,900
(viii)
Conditional Use Permit:
(1) HEX
$3.710
$3,710
(2) Administrative
$1,800
$1,800
(31 Revision (minor, administrative)
50% of Application Fee
SO%of Application Fee
(4) Revision (major)
Application Fee
Application Fee
IN)
Critical Areas Exemption
N/C
N/C
(x)
Critical Areas Permit
$1A10
$1,410
NO
Critical Areas Review Fee: forthose projects that propose impacts to critical areas and will be billed at the cost of
100% of contract cost
100%of contract cost
contract biologist's review!
(xii)
Development Agreement
$11,240
$11,240
(xiii)
Environmental Impact Statement Cost include the coordination, review and appeal. Draft and Final'
100%of cost
100%of cost
(xiv)
Environmental Checklist Review
$1,800
$1,800
(xv)
Environmental (SEPA) Addendum
$1.800
$1,8D0
(xvi)
Fence Permit (special)
$180
$180
(xvii)
Grading and Filling Permit (Hearing Examiner)
$6,080
$6,080
(xviii)
Home Occupation Permit (Special)
$230
(xix)
Landscape Review Fee
$1g0
$180
(xx)
Legal Lot Segregation
N/C
N/C
(xxi)
Lot Consolidation
$570
$570
(xxii)
Lot Line Adjustment
$1,230
$1,230
(xxiiij
Manufactured/Mobile Home Park:
(1) Tentative
$1,230
$1,230
(2) Preliminary
$3,650
$3,650
(3) Final
$1,800
$1,800
(xxiv)
Open Space Classification Request
$170
$170
(xxv)
Plats:
(1) Preliminary Short Plat
$6,080
$6,080
(2) Final Short Plat
$3,040
$3,040
(3) Preliminary Plat
$12,170
$12,170
(4) Final Plat
$6,080
$6,090
(5) Minor Plat Amendment
50% of Application Fee
50% of Application Fee
(6) Major Plat Amendment
Application Fee
Application Fee
(xxvi)
Planned Urban Development .
(1) Preliminary Plan
$6,080
56,080
(2) Final Plan
$3,030
$3,030
(xxvii)
Reasonable Use Exception:
(1) In conjunction with land use permit
$570
$570
12) Stand alone
$1,730
$1,730
(xxviii)
Public Arts Exemption
N/C
N/C
(xxix)
Rezone
$5,900
$5,900
jxxx)
Routine Vegetation Management Permit without Critical Areas
$120
$120
jxxxi)
Shoreline -Related Permits:
(1) Shoreline Permit Exemption
N/C
N/C
(2) Substantial Development Permit
$3,030
$3,030
MultConditional Use Permit
$3,650
$3,650
(4) Variance
$3,650
$3,650
(xxxil)
Site Development Plan (She Plan or Master Plan which includes design review fee for projects subject to RMC 4-3-300):
(1) Hearing Examiner Review
$4,270
$4,270
(2) Administrative Review
$3,030
$3,030
(3) Modification Iminor, administrative)
50% of Application Fee
50% of Application Fee
(4) Modification (major) required new application and repayment of fee required
Application Fees
Application Fees
(xxxiii)
Small Cell Permit, per site
$570
SS70
(xxxiv)
Special Permit (Hearing Examiner)
$3,030
53,030
(xxxv)
Street Naming (Honorary)
(1) Application
$280
$280
(21 Installation
$290
$ZB0
(xxxvi)
Temporary Use Permits
(1) Tier 1
$120
$120
(2) Tier
$230
$230
(xxxvii)
Variance (per each variance requested) Administrative or Hearing Examiner
$1,490
$1,490
(xxxviii)
Waiver or Modification of Code Requirements cost is per request
5290
$290
(xxxix)
Zoning Compliance Letter
$540
$540
City of Renton Fee Schedule
2023-ZO24
SECTION X11. DEVELOPMENT FEES (CONTINUED) s
2. Land Use Review Fees: (Continued)
a. General Land Use Review' (Continued)
s Exception for Projects Vested in the County: For those projects that have vested to a land use permit under the development regulations of King County, the King County Land Use Review
Fee Schedule shall aoply, and is hereby, adopted by reference. A copy of that fee schedule has been filed with the City Clerk and Is available at the City Clerk's office for Public review.
r Per RMC 4-3-1 the City may charge and collect fees from any applicant to cover costs Incurred by the City in review of plans, studies, monitoring reports and other documents related to
evaluation of impacts to or hazards from critical areas and subsequent code-requlred monitoring.
s When the City Is the lead agency for a proposal requiring an Environmental Impact Statement (EIS) and the Environmental Review Committee (ERCI determines that the EIS shall be
prepared, the City may charge and collect a reasonable fee from any applicant to cover costs incurred by the City In preparing the EIS. The ERC shall advise the applicants) of the projected
costs for the EIS prior to actual preparation; the applicant shall post bond or otherwise ensure payment of such costs. The ERC may determine that the City will contract directly with a
consultant for preparation of an EIS, or a portion of the EIS, and may bill such costs and expenses directly to the applicant. Such consultants shall be selected by mutual agreement of the City
and applicant after a call for proposals. If a proposal Is modified so that an EIS is no longer required, the ERC shall refund any fees collected under this subsection which remain after incurred
costs are paid. The City may collect a reasonable fee from an applicant to cover the cost of meeting the public notice requirements of this Title relating to the applicant's proposal. The City
shall not collect a fee for performing its duties as a consulted agency. The City may charge any person for copies of any document prepared under this Title, and for mailing the document, in a
manner orovided by chanter 42.17 RCW.
r Prior to Issuance of a small cell permit, the applicant shall pay the actual administrative expenses incurred by the City that are directly related to the City's review of the application,
Including plan Inspection, and approval, as authorized by RCW 35.21.860(1)(b), as may be amended.
Miscellaneous Fees':
(i) Permit review staff overtime (applies only if permit review is requested by the applicant to be performed on $175/hr $175/hr
Saturdays, Sundays, observed City of Renton holidays, and non -holiday Monday -Fridays outside ofthe hours of uty
staff regular work schedule)
s Exception for Projects Vested In the County: For those projects that have vested to a land use permit under the development regulations of King County, the King County land Use Review
Fee Schedule shall apply, and is hereby adopted by reference. A copy of that fee schedule has been filed with the City Clerk and is available at the City Clerk's office for cubllc review.
City of Renton Fee Schedule
2023-2024
SECTIONDEVELOPMENT aNTINUED) 2023 2024
3. Site Work, Utilities, and Right of Way Fees:
a. Site Work and Civil Construction Fees
I.) Clearine. Gradine. Excavation. and Mining Permits and License Fero Fee, shall he hasrd ran rhr, hmhro rl-rr,orrrrd
Tier
Grade and Fill Quantity
Cleared or Disturbed Area
New or Replaced Hard Surface
0
< 50 c
< 7,000 sf
c 2,000 sf
1
50 cy-499ry
7,000 sf-<3/4 acre
2,D00 sf-4,999 sf
2
500c- 4,999 cy
3/4 ac-<1ac
5,000 sf -clac
3
5,000c-49,999
1ac-<25ac
lac-<2.5 ac
4
50,000c-99,999
25ac-<5 ac
2.5 ac-<5 ac
5
100,000 cy and larger
5ac and larger
5ac and larger
t+f ne ewr mraxe Fee:
(a) Tier 0(no permit required)
N/A
(b) Tier 1
$520
(c) Tier
5700
(d) Tier
$1,05D
(q Tier
$1,400
(e) Tier
$1,750
(2) Inspection/Issuance Fee:
(a) Tier 0 (no permit required)
N/A
(b) Tier 1
$500
(c) Tier
$1,000
(d) Tier
$1,330
(1) Tier
$2,660
(e) Tier
$3,990
(3) Solid Waste Fills Review Feet:
1.5 x Review/Intake Fee
(4) Annual Licenses of Solid Waste Fills Review Fee1 r
1.5 x Review/Intake Fee
(ii) Civil construction plan review and inspection fees"
(1) $150,000,00 or less
6%of cost
(2) Over $150,000.00 but less than $350,000 00
$9,000+ 5%over $150,000
(3) $3S0,000.00 and over
$17,500. 4%over $350,000
(lit) Site Plan/Zoning Review and Inspection Fee °'
0.5% of cost
(Iv) Plan Revision following Permit Issuance
N/A
$520
$7D0
$1,050
$1,400
$1,750
N/A
$500
$1,000
$1,330
$2,660
$3,990
1.5 x Review/Intake Fee
1.5 x Review/Intake Fee
6% of cost
$9,000 + 5% over $150,000
$17,500 + 4% over $350,000
0 5% of cost
(1) Minor (Results in a change 10%or less than the cost of improvements' Excludes minor adjustments that are $280 $290
approved by the City to be shown on record drawings )
(2) Major (Results in a change of greater than 10%of the cost of,mprovements ) $1,700 51,700
(v) Wet weather lannual fee)
$3,000 $3,000
' The fee for a grading license authorizing additional work to that under a valid license shall be the difference between the fee paid for the original license and the fee shown for the entire project.
t Any unused fee may be carried forward to the next year. If any work Is done before the license is issued, the grading license fee shall be doubled.
' All developers, municipal or quasi -municipal entities, or utility corporations or companies, except those specifically exempted, shall pay fees under this Section. Exempted entitles Include City -
franchised cable TV, cable modem, natural gas, telecommunications, and electrical power.
' Includes three (3) review cycles. Additional reviews will be charged $1,700 each.
s If deemed necessary by the City in its sole discretion, the City will contract with one or more consultants to provide plan reviews and/or Inspections with the related costs and expenses payable by
the applicant.
` The fee shall be based up percentage of the estimated cost of improvements.
r Cost of Improvements shall be based on the City's bond quantity worksheet and shall include all project related improvements outside of the building envelopes, including, but not limited to, all costs
required to construct the following: paved parking lots, private sidewalks or walkways; private and public storm water management facilities; temporary erosion and sedimentation control facilities;
water quality facilities; public and private streets; public and private sanitary sewers; public water main improvements; required off -site street, bike and pedestrian improvements; street lighting
improvements; required landscaping and street tree improvements; and site grading and mobilization costs. The applicant may elect to submit a separate, Itemized cost estimates for each item of
improvement subject to the approval by the City.
` Fifty Percent (50%) of the fee is due at Civil Construction Permit Application and the remaining shall be due prior to permit issuance.
b. Latecomers' Agreement Application Fees'
Processing fee' (Nonrefundable)
(1) $50,000 orless
(2) Over$50,000 but less than $200,000
13) $200,000 and aver
$1,120 $1,220
$2,250 $2,250
$4,S00 $4,500
Jul Muiti-family: 2 units, Duplexes, & Accessory Dwelling Unit (ADU)'
(1) $50,000orless 15%of total 15%of total
(2) Over $50,000 but less than $200,000 10%of total 10%of total
(3) $200,000 and over 5% of total 5% of total
(iii) Segregation processing fee, if applicable 5840 $940
` Fees are based on the amount covered by the latecomers'.
' The administration and collection fee is deducted from each Individual latecomer fee payment and the balance forwarded to the holder of the latecomer's agreement pursuant to RMC 9-5, Tender of
Fee.
C. Utility5ystem Development Charges(SDC)
(i) Water and Wastewater System Development Charges (SOC)
(1) 5/8 x 3/4 inch and 1 inch
(a) Waterservicefee"
$4,850
$4,850
(b) Fire sprinkler service fee "
$648
$648
(Q Wastewater fee'"
$3,650
$3,650
1-1/2 inch:
(a) Water service fee'
$24,250
$24,250
(b) Fire sprinkler service fee rs
$3,239
$3,238
(c) Wastewater fee'
$16,250
$18,250
2 inch:
(a) Water service fee
$38,800
$38,800
(b) Fire sprinkler service fee"
$5.181
$5,181
(c) Wastewater fee'
$29,200
$29,200
10
City of Renton Fee Schedule
2023-2024
SECTION DEVELOPMENT (CONTINUED
t
3. Site Work, Utilities, and Right of Way Fees: (Continued)
c. Utility System Development Charges (SDCI: (Continued)
(4) 31nch:
III) Waterservicefee°
$77,600
$77,600
I Fire sprinkler service fee
$10,362
$20,362
(c) Wastewater fee'
$58,400
$58,400
(5) 4 inch:
(a) Waterservicefee'
$121,250
$121,2So
(b) Fire sprinkler service fee
$16,191
$16,191
(c) Wastewaterfee°
$92,250
$91,250
(6) 6 inch:
(a) Water service fee
$242,S00
$242,500
(b) Fire sprinkler service fee r'
$32,383
$32,393
(c) Wastewater fee
$182,500
$182,500
(7) 8 inch:
(a) Water service fee
$388,0DO
$388,000
(b) Fire sprinkler service fee ',°
$51.812
$51,812
(c) Wastewaterfee°
$292,000
$292,000
4ii) Storm Water System Development Charges (SDCI:
(1) New single family residence (including mobile/manufactured homes) & Accessory Dwelling Unit (ADU) s
$2,300
$2,300
(2) Addition to existing single family residence greater than 500 square feet (including mobile/manufactured homes) Fee
$0.920 per so foot
50 920 per sq foot
not to exceed $2,300
(3) All other uses charge per square foot of new impervious surface, but not less than $2,300
$0.920 per so foot
$0.920 per so foot
(i if) Utility SDC Segregation Requests
$940+ administrative costs
$840 +administrative costs
(iv) Temporary Utility Connection':
(1) Storm Water Fee; Fee equal to thirty percent (30%) of the current SDC applicable to that portion of the property.
30%of SDC
30%of SDC
(2) Wastewater Fee; Annual fee equal to thirty percent 130%) of the Current SDC applicable to the size of the temporary 30%of SDC 30%of SDC
domestic water meter(s)
(3) Water Fee; Annual fee equal to thirty percent (30%) of the current SDC applicable to the size of the temporary water 30%of SDC 30%of SDC
meter(s).
r This fee shall be reduced by fifty percent (50%) for Accessory Dwelling Units (ADU).
' Based upon the size of the fire sprinkler service (NOT detector bypass meter)
' Unless a separate fire sprinkler service Is provided, the system development chattels) shall be based upon the size of the meter Installed and a separate Fire sprinkler service fee will net be charged.
' Any parcel that currently has water and or sewer service is eligible for a prorated system development charge is eligible for credit of the existing connection. Feels) based upon meter(s) proposed for
final project will be reduced by the feels) based upon meter existing on site.
s The applicant shall pay the City's administrative costs for the preparation, processing and recording of the partial payment of the feels). If the same segregation Is used for more than one utility's
special assessment district, and/or latecomer's charge, then only one administrative fee Is collected.
Temporary connection may be granted for a one-time, temporary, short-term use of a portion of the property for a period not to exceed three (3) consecutive years. Fee shall be paid annually (non -
prorated), and shall be nonrefundable, nontransferable (from one portion of the property to another) and shall not constitute a credit to the system development charge due at the time of permanent
use of the utility system. The application for temporary connection shall consist of a detailed plan and a boundary line of the proposed development service area for use in the fee determination.
III. Utility Construction Permit Fees
(i) Water Construction Permit Fees
(1) Water Testing, Construction, and Administration Fees
(a) Water meter tests for 3/4-to 2- meter
(b) Water meter tests on meters 2" or larger
(c) Open and close fire hydrants for fire flow tests conducted by others.
(d) Water service disconnection (cut at main)
(e) Meter resets
(f) Repair of damage to service
(g) Water main connections
(h) Water main cut and cap
(i) Water quality/inspection/purity tests
6) Specialty water tests (lead, copper, etc)
(k) Water turn ons/offs after hours
(1) Installation of isolation valve.
(m) New waterline chlorination fee. Fee plus $0.15 per lineal foot for any footage after the first two hundred fifty
(250) lineal feet
(n) Miscellaneous water installation fees.
(o) Service size reductions
(p) Installation fees for ring and cover castings
(2) Water meter installation fees - City installed:
(a) 3/4" meter installed by City within City limits.'
(I) Installation ofstub service and meter setteronly.
(ii) Drop in meter only
(b) 3/4" meter installed by City outside City limits'
(i) Installation of stub service and meter setter only.
(h) Crop in meter only
(c) I' meter installed by the City.'
(i) Installation of stub service and meter setter only
(li) Drop in meter only
(d) 1-1/2" meter installed by the City.
(i) Installation of stub service and meter setter only
(if) Drop in meter only
11
$50
$50
$60 deposit +
$60 deposit+
time and materials
time and materials
Time and materials
Time and materials
$275
$275
$95
$95
$250
$250
$560
$560
$1,025
$1.025
$80
$80
Cost of test +
Cost of test +
$70 processing fee
$70 processing fee
$185
$185
$2,000 deposit +
$2,000 deposit +
time and materials
time and materials
$250+$0.15 per lineal foot
$250+$0.15 per lineal foot
Time and materials
Time and materials
$50
$50
S200
$200
$2,975
$2,875
$400
$400
$2,935
$2,935
$400
$400
$2,875
$2,875
$460
$460
$4,605
$4,605
$750
$750
City of Renton Fee Schedule
2023-2024
'SECTIONDEVELOPMENT (CONTINUED
F2024
3. Site Work, Utilities, and Right of Way Fees (Continued]
d. Utility Construction Permit Fees: (Continued)
(e) 2" meter installed by the City.
(i) Installation of stub service and meter setter only.
$4,735
$4,735
(ii) Orap in meter only
$950
$950
(3) Water meter processing fees—Applicantinstalled: For meters larger than 2", the applicant must provide materials
$220
$220
and install the meter.
(4) Hydrant Meter fees:
(a) Hydrant meter permit fee
$So
$SD
(b) Deposits:
(1) 314" meter and backnow prevention assembly
$500
$500
(if) 3" meter and backnow prevention assembly.
$2,000
$2,000
(iii) Deposit processing charge, nonrefundable.
$25
$25
(c) Meter rental (begins on day of pickup):
(i) 3/4" meter and backnow prevention assembly. Per month
$50
$50
(111 3' meter and backnow prevention assembly. Per month.
$250
$250
Wastewater and Surface Water Construction Permit Fees':
(1) Residential:
(a) Wastewater permit fee
$375
$375
(b) Surface water permit fee
$375
$375
(21 Commercial:
(a) Wastewater permit fee
$375
$375
(b) Surface water permit fee
$375
$375
(3) Industrial:
(a( Wastewater permit fee
$375
$375
(b( Surface water permit fee
$375
$375
(4) Repair or modification of any of the above
(a) Wastewater permit fee
$375
$375
(b) Surface water permit fee
$375
$375
(5) Cut and Cap/Demolition Permit:
(a) Wastewater permit fee
$375
$375
(b) Surface water permit fee
$375
$375
(6) Reinspection for Wastewater or Surface Water Permits
$375
$375
(7) Ground water discharge ltemporary connection to wastewater system for dlschargeof contaminated ground water
$375
$375
over 50,D00 gallons) Rate plus billed far current Renton and King County sewer rate on discharged amount (meter
plus King County sewer rate on
plus King County sewer rate on
provided by property owner)
discharged amount
discharged amount
(iv) Street light system fee, per new connection to power system
$525
$525
(v) Utility Locate Refresh Fee (Fee is due each time excavator calls in for locate refresh during 45-day locate ticket)
(1) Standard locate
$500
$500
(2) Large project locate
$1,000
$1,OD0
' This fee shall be $0 for Accessory Dwelling Units (ADU).
z This fee shall be reduced by fifty percent 150%) for Accessory Dwelling Units (ADU).
Right of Way (ROW) Use Permits Fees'
(i) Franchise Permit Fees:
(1) Master Service Agreement Application Fee'
5S,620
$5,620
12) Franchise Permit Fees: I
(a) Small work, including trenching less than 60 linear feet or installation of 6 or less utility poles
$670
$670
(b) All other work, permit fee plus staff time per hour'
$670+Time and Materials
$670+Time and Materials
(c) Other public agencies constructing utilities within City right-of-way
$670
$670
(3) Small Cell Master Lease Agreement including Site License Addendum and Small Cell Permits
(a) Master Lease Agreement Administrative Costs, Staff time per hour and/or cost of materials.°
Time and Materials
Time and Materials
(b) Pole Reservation, per pole
$135
$135
(c) Administrative Fee, Base plus time and/or cost of materials.°
$850 deposit +Time and
$850 deposit +Time and
(d) Public Reimbursement (any costs incurred by the City on behalf of the permit applicant forinstallation or
operation of site equipment)
(1) Electrical service (annual fee)
(1) Tier 1, Daily peak kWh <20
$725 38
$715.38
(2) Tier 2, Daily peak kWh 21. 40
$1,43076
$1,430.76
(3) Tier 3, Daily peak kWh 41 - 60
$2,146 14
$2,146.14
(4) Tier 4, Daily peak kWh 61-80
$2,861.51
$2,861.51
(5) Tier S, Daily peak kWh>81
$3,57669
$3,576.89
(4) All other reimbursement
Actual cost
Actual cost
(e) Site License Addendum Rent
$270
$270
(f) Allotherfeess
Actual cost
Actualcost
14) Conduit Lease Rates per Lineal Foot (annual fee):
(a) Tier 1, conduit in existing planter strips
$10 00
$10.00
(b) Tier 2, conduit outside of planter strips excluding signalized intersection crossings, bridges and train tracks
$2000
$20.00
(c( Tier 3, conduit within signalized intersection crossings, bridges and train tracks
$30 00
$30.00
Short -Term ROW Permit Fees (duration 30 days or less)";
(1) Single family residence, one unit only
$370
$370
(2) All other uses, excluding those listed
$700
$700
(3) Wastewater or storm water service
$375
$375
12
City of Renton Fee Schedule
2023-2024
t✓ (• • a 1
3. Site Work, Utilities, and Right of Way Fees: (Continued)
e. Right Of Way Use Permits Fees' (Continued)
Long Term ROW Permit Fees (duration over 30 days)z
(1) Duration greater than thirty (30) days but no more than one (1) year
(a) Within City Limits'; Short -Term ROW Permit Fee associa led with use plus leasehold excise tax (LET)'
Short -Term ROW
Short -Term ROW
Permit Fee +LET'
Permit Fee +LET'
lb) King County ROW Perm its/Inspections:
(i) Service Installation Only
$1,025
$1,025
(ii) Utility Extension per 100' of Length (M'n 200' Length)
$1,025
$1,025
Duration greater than one (1) year' 10.
(i) Single family and two family uses1p; fee assessed annually plus leasehold excise tax (LET)', if applicable
$50+ LET'
$50+LET'
(ii) All uses without public benefit fee is a per month charge assessed annually based on property value 1° of
0.5%x Value' LET'
0.5%x Valuers. LET'
land to be utilized, plus leasehold excise tax', if applicable.
'
(id) All other uses, fee is a per year charge of assessed value of land adjoining the property' z, plus leasehold
D.5%x Valuers+LET'
S
0.5%x Value" + LET
excise tax', if applicable. In no case less than $50 OD.
6v) Oversize Load Permits
$10 $10
' Bond required pursuant to RMC 9-10-5
s Work and/or use of the right of way, including those associated with a civil Construction Permit and excludes utilities from other public agencies and service providers which shall be considered
under a franchise permit.
' The fixed application fee established herein Is Intended to cover the Cityfs Internal administrative costs In processing and administenng the franchise. In addition to the fixed application fee, the City
may require applicants to either directly pay or reimburse the City for external costs reasonably incurred to process the application and/or administer the franchise agreement. The City may require
applicants to deposit funds In advance to cover legal and/or other professional services fees as they are Incurred.
' The City may decide to contract with a consultant to perform plan reviews and inspections and may bill such costs and expenses directly to the applicant.
' If a franchise agreement does not specify the fee amount, the generic fee, as identified in this fee schedule, shall be collected.
' Regular hours and standard after hour and overtime fees apply.
'A no fee permit may be Issued for the following: Individual homeowners performing work In street ROW for street tree or parking strip Irrigation systems; residential moving pods or moving trucks
provided that they are In the ROW for no more than three (3) days; use in CD zone provided ground disturbing activity is not proposed; and work associated with City of Renton capital improvement
Protects or Citv funded projects.
r A no fee permit may be Issued for the following: A public agency and when the proposed use of the right-of-way provides a direct service to the public (e.g., Metro applications for right-of-way far
bus shelters); and work associated with City of Renton capital Improvement projects or City funded projects.
' Leasehold excise tax (LET) imposed pursuant to Chapter 82.29A RCW on leasehold Interests for the use of real or personal public property shall be collected from the permittee at a rate established
by the State of Washington.
10 Insurance Required: Public Liability and property damage Insurance is also required pursuant to RMC 9.2-51 Minimum Permit Requirements for Excess Right -of -Way Use.
rr Except those single family and two family uses that utilize right of way along a waterfront.
" Right-of-way value shall be based on the assessed value of the land adjoining the property as established by the King County Assessor.
f. Release of easement fees: The Imooslti on, collection, payment and other specifics concerning this charge are detailed in chapter 9-1
RMC, Easements.
(i) Filing fee
$280
$280
(ill Processing fee
$280
$280
I. Street and Alley vacation Fees: The imposition, collection, payment and other specifics concerning this charge are detailed in chapter
9.14 RMC, Vacations.
W Filing fee
$560
$560
(i i) Processing and completion fee, payable upon Council approval of the vacation and upon administrative determination of
appraised value of vacated right-of-way. Appraised Value of Vacated right-of-way
(1) Less than $25,000
$840
$ 40
(2) $25,000 to $75.000
$1,430
$1, 430
(3) Over$75,000
$2,250
$2,250
h. Miscellaneous Fees:
(I) Street Frontage Improvements Fee-Il
(1) All eligible uses except Single Family Additions less than 1,1ri0 sq ft:
(a) Street with existing storm drainage main line
$130/LF
$130/1
to) Street with existing conveyance ditch
5150/LF
$150/1
(2) Single Family Additions less than 1.160 Sq Ft: Proportional share of the fee in lieu of all eligible uses fee based on
(Sq Ft of addition / 1,160 sq ft)
(Sq Ft of addition 11,160 sq it)
square footage of addition.
o1 Feetin-heu
of Fee -in -lieu
(li) Re -inspection Fee
$158
$158
(iii) Inspection for Unscheduled Work'
$158
$158
(w) Regular Staff Review and Inspection Hours'
$158/hr
$158/hr
(v) After hours inspection
$175/hr
$175/hr
(vi) Permit review staff overtime'
$175/hr
5175/hr
(vn) Public Works Reimbursement' Actual cost Actual cast
(viii) Standard or minor drainage adjustment review $670 $670
' This fee shall be $0 for Accessory Dwelling Units (ADU).
s Unscheduled work Includes, but is not limited to, site work that is found to be occurring, or did occur, for which an inspection was not scheduled. Fee is subject to be applied for each occurrence but
does not replace a stop work order or other code violation as determined applicable by the City. The fee is in addition to any other applicable inspection fees. The fee may provide day of inspection at
the discretion and availability of the City inspector.
' Applies only to those fees that are noted as time and materials and performed during city staff regular work schedule.
x Applies to inspections performed on Saturdays, Sundays, observed City of Renton holidays, and non -holiday Monday -Fridays outside the hours of 7:OOam to 3:30pm.
' Applies only if permit review Is requested by the applicant to be performed on Saturdays, Sundays, observed City of Renton holidays, and non -holiday Monday -Fridays outside of the hours of city
staff regular work schedule
s Any work performed by City forces or under City contract on behalf of a permit applicant to repair damage to the City infrastructure or caused by the permit applicant or contractor under Its control,
or any and all roadway or right-of-way cleanup efforts performed by City forces or under City contract that resulted from the work performed by the permit applicant or contractors under its control.
13
City of Renton Fee Schedule
2023-2024
SECTIONDEVELOPMENT e a
4. Technology Surcharge Fee
s
r 24
An additional technology surcharge shall be required for all fees included in the following Subsections of Section XII, Development Fees,
5.0%
5.0%
of the City of Renton Fee Schedule Brochure: Subsection 1, Building Fees; Subsection a, except for appeals, critical areas review fee, and
direct EIS casts, of subsection 2, Land Use Review Fees; Subsections a, In, c(iii), d, and e, except Master Franchise/Small Celt Permit
Application Fee and Long Term ROW Permit Fees Iduration over one year), of subsection 3, Site Work, Utilities, and Right of Way Fees;
and Section XIII, Fire Department Fire Marshall Fees
S. Impact Fen:
a. Schaal Impact Fees.
Ill Issaquah School District
(1) Single Family Fee
$11,377
$15,510
(2) Multi Family, Duplex, & Accessory Dwelling Fee (ADUI
Sill
$3,514
(ill Kent School District
(11 Single Family Fee
$0,00
$moo
(21 Multi Family, Duplex, & Accessory Dwelling Fee (ADU)
$0.00
SCIDO
(ill) Renton School District
(1) Single Family Fee
$2,911
$2,161
12) Multi Family, Duplex, & Accessary Owe Ping Fee (ADU)'
$3,697
$4.257
fwI School Impact Fee Administration
5% X School Impact Fee
5% X School Impact Fee
' This fee shall be $0 for Accessory Dwelling Units (ADUI.
Is. Transportation Impact Fees" 4:
ITE Land Use
Codes
11) Accessory,Dwelling Unit ADU, per dwelling
[ ( 1 P 8
ITE LUC 2z0
.02
00
$4,.79
(if) Church, per sq foot
ITE LUC 560
$6$6.0
$
(ill) Coffee/Donut Shop, no drive up, per sq foot
ITE LUC 996
SZ48.51
$175 21
(IV) Coffee/Donut Shop, with drive up, per sal foot
ITE LUC 931
$261,04
$211.59
(V) Convenience market -24 hour, per sq foot
ITE LUC 851
$24994
7.87
$20.81
(vi) Daycare, per sq foot
$69.16
$19.81
(WI) Drinking Place, per sq foot
7E LUC 975
$69..1
514..9
(Vill) Drive-in bank, per sq foot
ITC LUC 912
$157.10
$120.84
04 Fast Casual Dining with 30 seat max, incl, only walk-up w ndow, per sq foot
ITE LUC 930
568.10
(x) Fast food, no drivii per sq foot
ITE LUC 933
$
23
(xi) Fast food, with circa p, per sq foot
ITC LUC 930
$203..13
032.87
$18$182
(xR) Gas station with convenience store, per pump
ITE LUC 945
$73,411.90
S89,966 30
(XIII) Gas station, per pump
ITE LUC 944
5
36.72
$8$636
(xiv) General Light Industrial, per sq foot
ITE LUC 210
SIO.6,27
S16.39
$40
(■sr) General office, per sq foot
ITE LUC 710
$40.49
$14.07
(xvl) Health/fitness club, per sq foot
ITE LUC 492
$g0.49
$35,23
(will High -Cube Warehouse: Cold Storage, per sq foots
ITE LUC 357
$2 57
Will High -Cube Warehouse: Fulfillment Center INS), per sq foots
ITE LUC 1SS
$2 33
(tdXl High -Cube Warehouse: Parcel Hub, persist (oats
ITE LUC 156
$10.12
lax) High -Cube Warehouse: Transload/Shan-Term, per sq foot'
ITE LUC 154
$161
(nl) Hospital, per sq foot
mE LUC 610
$8
(nil) Hotel, per room
ITE LUC 310
$q,819.19.16
$4,Z16,216.05
Inlii) Industrial Park, per sq foot'
ITE LUC 230
$5 62
poly) Manufacturing, per sq foot'
ITE LUC 140
$04
(XXv) Marina, per boat berth
ITE LUC 42U
52,S 70.22
$2,2116$10,
(tal Medical office, per sq foot
ITE LUC 0
$37.0E
,28fi.67
$36 23
(Xavli) Mobile home, per dwelling
4
ITE LUC 20
$7,228.75
$7,068 Il
(Mill) Motel, per room
ITE LUC 32D
$4,417.57
$3,001 2S
(xxix) Movie theater, per seat
ITE LUC 445
$72E 88
$718.04
(last) Multifamily Housing, per dwelling
ITE LUC 220
57,550,0E
459
$1,28511
(Mill Nursing home, per bed
ITE LUC
5$68.51
$SS6023
(xXvii) Restaurant: sit-down, per sq foot
ITE LUC 932
932
568.51
$5602
(Xniii) Self-service Storage, per sq footITELUC
(axxiv) Senor housing- detached, per dweling
ITE LUC 251
$3,293
5
Xxv) (xShopping center, per sq foot
ITC LUC 820
$29.8g
,694
$24$24 37 37
(nxvil Single family house, per dweGng
ITE LUC 210
$12,
$11,49567
xsnA (Xl) Supermarket, per sq foot
ITE Luc gsD
$73.97 3.97
$6317
(Xal Townhouses, per twisting
ITE LUC 2IS
56,345.23
$6,987.79
(MIX) Warehouse, per sq foot'
ITE LUC ISO
$3 29
(xxzx) Net New PM Peak Hour Person Vehicle Trip (Proposed • Existing, Per PM Peak Hoer Person Vehicle Trip
$8,031.94
$8,031.94
L ITE LUC: Institutue of Transportation Engineers Land Use Codes defined in the 11th Edition ITE Trip Generation Handbook
' Impact lees include a Passenger Car -Equivalent (PCE) factor.
' Applied fee reductions based on uses by percentage of Net New PM Peak Hour Person Vehkle Trip: Early teaming Facilities
(i.e. Davcarel is 20%and Commercial/Retall/Industrial Is 88.97% except uses with PCE factors which w18 remain at 100%.
All uses within the Center Downtown ICD) Zone shall be reduced to 20%of the assessed transportation Impact fee.
C. Park Impact Fees:
(I) Single family
53.276.44
$3,27644
110 Multi -family: 2 units, Duplexes, & Accessory Dwelling Unit (ADL I
S2.659.70
$2,659.70
(8i) Multi -family: 3 or4 units
$2,531.21
$2,531.21
(IV) Multi -family: S or more units
$2,2.6
$2.2 254
I'd Mobile home
$2,325.63
$2,3256363
s This fee shall be $0 far Accessory Dwelling Units (ADII{.
d. Fire Impact Fees:
(I) Residential - single farm y (detached dwellings & duplexes), per dwelling unit
$029.77
$42198
(n) Residential - multifamily& Accessory Dwelling Unit (ADO)', per dwelling un It
$964.S3
$57941
(hi) Hotel/motel/resort, per room
$3.
2
I.) Med cal care facility, per bed
$3.92
$1,05 00
(vl Office, per sq foot
$O Z6
,052
$0.14
14
City of Renton Fee Schedule
2023.2024
,SECTIONDEVELOPMENT •
r
S. Impact Fees: (Continued)
(vi) Medical/dental office, per sq foot
$125
61
(vt) Retail, per sq foot
$236
$066
$042
(viii) Leisure facilities, per sq foot
$142
(ixl Restaurant/lounge, per sq foot
S592
559s
$144
(x) Indusvial/manufacturing, persq foot
5015
OS
$024
(xi) Church, per sq foot
$072
$0.24
(ail) Education, per student
$2802
(xiii) Special public facilities, per sq foot
S448
49
$01313
r This fee shall be SO for Accessory Dwelling Units (ADU).
e. Independent Fee Calculation Review(or unless otherwise established by School District or Renton Regional Fire Authority)
$560
SS60
I. Impact Fee Deferral Administration
(i) Each Lot, Single Family Owe Ong, or Condominium
$100
$lOD
(ii) Each Multi -fatuity Building
$100
Sim
6. Miscellaneous Fees
a. Multifamily Tax Exemption Application
SI,000 00
$1,000.00
b. Tree Fee In lieu, credit replacement, and/or credit supplement
Ill Per diameter inch measured at 45 feet above grade
S22S00
$225.00
fill Labor cost for each 2' caliper(or 6ft tall) tree to be planted
$50000
$50000
c• Affordable Housing Cash Payment in L eit" t:
(i) Zip Code 98055
(1) Stud.
$227.51020
(2) 1-Bedroom
(3) 2-Bedroom
$253,46939
$253,46939
(4) 3-Bedroom
$406,775 51
(5) 4-Bedroom
$495,673 47
111) Zip Code 98056
(11 Stud
,265 31
$156,48990
12) 1-Bedroom
$170.20408
(3) 2-Bedroom
$296,57243
(4) 3-Bedroom
$368,32653
(5) 44Bedroom
$3fi8,32fi 53
(1111 Zip Code 9BOS7
(1) Studo
$1
12) 1-Bedroom
$124,,65306
(3) 2-Bedroom
$ 33,46939
(4) 3•Badrtwm
247,4
$ 591
(5) 4-Bedroom
$31414,4488a8 98
(iv) 21p Code 99058
(1) Studio
$203,551O2
(2) 1-Bedroom
$
(3) 2-Bedroom
$211,11,936 3673 73
(4) 3 Bedroom
$ 2,89796
(5) 4 Bedroom
$432,000.00
IWI Zip Code 98059
(1) Studio
12245
$262,79592
(2) 1-Bedroom
(3) 2-Bedroom
$292,65306
08
(4) 3.3edroom
$458,204
$555,89708
(5) 4-Bedroom
$556,897 9fi
'The cash payment In lieu iscakulaled by multiplying the fee shown In the table by the number of affordable housing units
requested for cash payment In Ileu of ort-site development.
z The cash payment In lieu shall be based on the zipcode of the project site. If the project she Is located Ina zipcode not listed
In the table above, the closest abutting zipcode shall be utilized to determine payment calculation.
s The bedroom count utilized to calculate the cash payment in lieu shall be based on the bedroom count majority developed on•
site. if the bedroom counts developed on -site are equally divided (11 50%1 bedrooms and 50%2 bedrooms), the higher
bedroom count shall be utilized for calculation. The bedroom number selection for payment calculation shall also comply with
RMC4.4-155 D, Number of Bedrooms.
SECTION XIII. FIRE DEPARIMENT FIRE MARSHAL FEES (RFA)
a. Fire pan review and ns pection fees
1
(1) SO to $249.99
$50
$50
(ii) $250.00 to$999.99
$50+ 2%of the cost
$50-2 %of the mat
(Ili) $1,000 00 to $4.999.99
$75+2%of the cost
$75+2%ofthe cost
(W) 55,000 OD to $49,999.99
$49,999999
5200+15%of the cost
$200+15%ofthe cost
Iv) $SO,OOO.o0
$450+12%o(the cost
$450+12%of the cast
(till $100,000D0 and above
$950+75%of the cost
5950+7.1%of the cost
(vill Construction Re -Inspection In Is per hour with a 2 hour minimum. The minimum may be assessed if the requested
$175
$175
:nspect:on does not meet the approval of the inspector.
(vill) Violation/Second Re4nspection after 30-day period (whenever 30 days or more have passed since Fire Department
5150
5150
notification of a violation, which required a first re4ropecdon, and such violation has not been remedied or granted an
extension)
(Ix) Third and subsequent re-Inspection/Pre-Citation Follow -Up Inspection when re -Inspections are required beyond the first
$250
$250
and second re -Inspections
Ix) Preventable Fire alarm fee
(1) First, second, and third preventable alarms
N/C
N/C
(2) Fourth and fifth preventable alarms in a calendar year, fee is per each alarm.
575
$75
(3) Sixth preventable alarm and successive preventable alarms in a calendar year, in Is per each alarm.
$15D
5150
(xi) Late Payment Penalty
$35
$35
Fire Permit type:
(i) Operational fire mtle permit (Issued in accordance with Section 105.6 of the IFC) fee is yearly lincludes items such as fire
special events, covered stages, mobile food facilities, hot works, etc.(
(11) Permits for Mobile food facilities that have passed a Ore and life safety inspection in another jurisdiction that has
reciprocity with Renton RFA
(Ili) Hazardous materials and HPM facilities yearly
(iv) Construction permit:
Hazardous production materials permit (for businesses storing, handling, or using hazardous production m ateria s as
regulated in the fire code) permit is yearly
Underground tank removal permit (commercial)
15
FM
$75
$250
20%of plan review fee
M.n.575
5250
$150
S75
$250
20% of plan review fee -
Min $75
S2S0
See Fire plan review and See Fire plan reviewand
construction permit fees construction permit fees
City of Renton Fee Schedule
1023-2024
[ON X III. FIRE IDEPARMENTIF• NTINU ED)
I
2023 2024
(v.i) Underground tank removal or a bandonirr in- place permit(residentia l) 5200 5200
tvii( Other requested inspection when not required by the fire code, or when requested for after hours inspections Fee is per $175 $175
hour with a minimum 2 hours when approved by the Fire Marshal, such as home daycares.
(ix) (Vill) Non -emergency Billable Semites (ie: boat assists, etc) Rates published at:
www.washingtonf irechief s. cons
(x) NSF check fees
(xi) RFA technology surcharge fee app�ied to Fire Department Fire Marshal Fees, subsection a, (i, ii, ill, Iv, v, vi) and subsection
Is (ill)
16
WFCCument Wagri WFC Current Wage and
Equipment Rate Equipment Rate
$25 $25
5% 5%
City of Renton Fee Schedule
2023-2024
1. Effect of Schedule. This schedule establishes default base penalties for violations of the Renton Municipal Code that are issued as infractions under the authority cf RCW 7 80 RCW, but these
penalties do not include any state -imposed statutory assessments. Except as otherwise prohibited by law or court rule, a court with jurisdiction over the infraction may impose on a defendant a
lesser penalty in an individual case. Provided that, whenever the base penalty plus mandatory statutory assessments results in a total payment that is not an even dollar amount, the base penalty is
deemed to be amended to a higher amount which produces the next greatest even dollar total
2. Penalties Established by Court Rule or Specific Penalty Established by Law. This schedule does notapply to penalties established by state
or local court rule or to a penalty that is established In law
with a specific amount (i.e ordinance or statute setting a penalty
equal to a specified amount rather than a penalty up to a maximum amount).
To the extent a penalty
scheduled herein conflicts
_ with a state or local court ru'e or a penalty that is established in law, this schedule shall be deemed preempted bythe court rule or penalty established In law
3. Penalties.
The following violations shall carry the following listed default base penalty, not including statutory assessments
a. Violation of Park Rules (Civil Infract on)
RMC 2-9-B.0
$73
$73
i Activities Prohibited in a Park
RMC 2-9-8.C.1
$73
$73
ii. D sregard Park Trail Sign
RMC 2-9-e.C.2
$73
$73
iii. Unauthorized Vehicle in a Park
RMC 2-9-B.C.3
$73
$73
iv. Operating Motorized Vehicle on Park Trail
RMC 2-9-B.C.4
$73
$73
v. Dismount Zone Violation
RMC 2-9-B.C.5
$73
$73
vi. Speeding on Trails
RMC 2-9-B.C.6
$73
$73
vd. Vehicle/Boat Repair in Park
RMC 2-9-8.C.7
$73
$73
vlii. Racing in Park
RMC 2-94C.8
$73
$73
Ix. SCUBA Diving in Park
RMC 2-9-B.C.9
$73
$73
x. Camping/Overnight Stay In Parks
RMC 2-9-8.C.10
$73
$73
11. Fire/Barbeque in Park
RMC 2-9-8.C.11
$73
$73
Al. Metal Detecting
RMC 2-9-B.C.12
$73
$73
xlli. Glass Container in Park with Swimming Area
RMC 2-9-B.C.13
$73
$73
xiv. Group Rally/Specoal Use Permit
RMC 2-9-8.C.14
$73
$73
xv. Parking & Mooring Violation
RMC 2-9-S.C.15
$73
$73
xvii. City Events Violation
RMC 2.94C, 16
$73
$73
xvii. Alcohol in Park
RMC 2.9.8,C.17
$73
$73
�
xviii. Smokingin Park
RMC 2A-8 C.17
$73
$73
b. Possession/Sale/Discharge of Fireworks
RMC 4-5-070.C. 102
549
$49
c. Animal Control - No License
RMC 5.4.1
$49
$49
d. Littering
RMC 6-14.22
$50
$50
i. Litter in Public Spaces
RMC 6-14.3
$50
$50
ii. Placement of Utter in Receptacles
RMC 6.14.4
$50
$50
ill. Sweeping Litter in Gutters
RMC 6-14-5
550
$50
iv. Merchants' Duty
RMC 6.14-6
$50
$50
v. Litter Thrown By Persons in Vehicles
RMC 6.14.7
$50
$50
vi. Truck Loads Causing Utter
RMC 6-14.8
$50
$SO
vii. Litter in Lakes and Fountains
RMC 6-14-10
$50
$50
viil. Throwing/Distributing Commercial Handbills in
RMC 6-14-11
Public Places
$50
$50
ix. Placing Handbills on Vehicles
RMC 6-14-12
$50
$50
X. Depositing Handbills on Uninhabited/Vacant
RMC 6.24-13
Premises
$50
$50
III. Prohibiting Distribution of Handbills Where
RMC 614-14
Properly Posted
$50
$SD
xii. Distributing Handbills at Inhabited Private Premises RMC 6.14-15
$50
$50
.iii. Dropping Litter from Aircraft
RMC 6.14-16
$50
$50
xiv Posting Notices Prohibited
RMC 6.14.17
$50
$50
xv. Litter on Occupied Private Property
RMC 6.14.18
$50
$50
xvi Owner to Maintain Premises Free of Utter
RMC 6.14-19
$50
$50
xvii Litter of Vacant Lots
RMC 6.14-20
$50
$50
e. Animal Control -Animal at Large
RMC 6.6.1 A
S49
$49
I. Animal Control -Animal/Fowl Habitual Noise
RMC 6.6-SA
$49
$49
g. Encroachment on Public Property
RMC 9.17-10
$100
$100
h. Negligent Operation of Watercraft
RMC9-3.5
S42
542
1. Speed Regulations of Watercraft
RMC 9-3-7
$42
$42
J. Obstructions of Waterways
RMC9-3-10
$122
$122
It. Equipment Numbering Violation
RMC9-3-26
$42
$42
I. Violation of Rules of the Road
RMC 9-3-31
$42
$42
m. Inattentive Driving
RMC 10.12-25
$67
$67
n. Truck Route Violation
RMC 10-12-26
542
$42
a. Avoiding Intersection
RMC 10.12-27
$42
$42
p. Unsafe Use of Scooter
RMC 10-22-28.0
$42
$42
q. Use of Scooter Where Prohibited
RMC 10.12-28 D
542
$42
r. Use of Scooter Without a Helmet
RMC 1D-12.28 E.1
$42
$42
s. No Reflectors on Scooter
RMC M22.29 E.2
$42
$42
t. No Muffler on Scooter
RMC 10 12-28 F
$42
$42
u. Scooter Operator Under Age 13
RMC 10.12-28.G
$42
$42
V. Operating Scooter When Prohibited
RMC 10.12-28.H
$42
$42
w. Violation of ATV Ordinance
RMC 10.2-5
$47
$47
All other violations identified by Renton Municipal Code
as an infraction not listed or otherwise specified by court rule Or law.
$49
$48
17