Loading...
HomeMy WebLinkAboutMFP24002619.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP24002619 IVR Number: 24002619 Permit Information Permit Name: JB0001845475 Comcast Cable Franchise Permit Address/Location:05/21/2024Application Date:0823059171Parcel Number: 915 HOUSER WAY N Permit Type:07/09/2024Issue Date:Franchise Permit Work Class:07/09/2025Expiration Date:Minor Utility Job Number: JB0001845475Franchise Type:Cable Description: JB0001845475 Comcast proposes to proof and pull 96ct fiber through existing conduit approx 614lf. Contacts Name Address PhoneTypeBilling Ashley Kiehn 4610 Tacoma Avenue Sumner, WA 98390 ApplicantX Jessica Bucholtz MasTec H: (253) 264-9898 C: (253) 264-9898 Applicant Joshua Ashley Comcast 410 Valley Ave NW, Suite 12 Bldg C Puyallup, WA 98371 B: (503) 939-7931Contact Andrew Parker comcast 410 Valley Ave NW Puyallup, WA 98371 B: (253) 864-4249Contact Tom Donnelly Comcast Business Communications 1701 Jfk Blvd, 32nd Floor Philadelphia, PA 19103 B: (215) 286-7347 C: (215) 286-7557 Contact Mastec North America Inc 800 S Douglas Road, 1200 Coral Gables, FL 33134 Contractor Business License Number: 51687Construction Contractor: MASTENA991KJ PARK DRIVE II LLC 9125 10TH AV S SEATTLE , WA 98108 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 3/18/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 3/18/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1.Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2.The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: ▪Include map(s) showing the location of the project and work area. ▪Be legible lettering and clear, contrasting, symbols of viewing or printing. ▪Must indicate street names, and north arrow and scale. ▪Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. -Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3.Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering (253) 4610 Tacoma Ave Sumner, WA 98390 9:00am 3:30pm1/4/2023 2/4/2023 JB0001845475 915 HOUSER WAY N, RENTON, WA 98057 MASTEC Jessica Bucholtz 264-9898 JB0001845475 - Comcast proposes to proof/pull 96ct fiber through existing conduit ~614'. 6/21/24 7/21/24MondayFriday 3:00pm9:00am MFP24002619 Scott Warlick CED 7/9/2024 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 3/18/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: •Must have approved Traffic Control Plan (TCP) prior to commencing the work. •Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. •WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •All permit conditions shall be met. NOTES: •Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. •Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. •Approved Temporary Traffic Control Plan must be at the work site during work hours. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. •Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. •In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 3/18/2021 •The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) 5/21/2024 Jessica Bucholtz REVISIONSDATE DESCRIPTION INITIAL1ADVANCED WARNING SIGN SPACINGROAD TYPE SPEEDDISTANCE BETWEEN ADVANCEDWARNING SIGNSXXXXFREEWAYS & EXPRESSWAYS55/75 MPH1500 ±1500 ±1500 ±1500 ±RURAL HIGHWAYS 60/65 MPH800 ±800 ±800 ±800 ±RURAL ROADS45/55 MPH500 ±500 ±500 ±500 ±RURAL ROADS & URBANARTERIAL35/40 MPH350 ±350 ±350 ±N/ARURAL ROADS, RESIDENTIAL &BUSINESS DISTRICTS25/30 MPH200 ± (2)200 ± (2)200 ± (2)N/AURBAN STREETS25 MPH ORLESS100 ± (2)100 ± (2)100 ± (2)N/A(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,AT-GRADE INTERSECTIONS, AND DRIVEWAYS.(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.LONGITUDINAL BUFFER SPACE =LBSSPEED (MPH)20 25 30 35 40 45 50 55 60 65 70DISTANCE (FT)115 155 200 250 305 360 425 495 570 645 730TAPER LENGTH IN FEET=L (FEET)LANEWIDTH(FEET)POSTED SPEED LIMIT (MPH)25 30 35 40 45 50 55 60 65 7010 105 150 205 270 450 500 550---11115 160 225 295 495 550 605 660--12125 180 245 320 540 600 660 720 780 8401Know what'sR915 HOUSER WAY N RENTON WA 98057915 HOUSER WAY NRENTON, WA 98057JB0001845475REVISIONSDATE DESCRIPTION INITIALCOMCASTSHEET OFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS:COMCAST JOB NUMBER: STAMPDRAWN BY:CB05/21/2024WARNING SIGNREGULATORY SIGNTRAFFIC CONEFLAGGER STATIONPATROL CARPOLICEOFFICERPOLICE OFFICERWORK VEHICLELIT INTERSECTIONUNLIT INTERSECTIONSPOTTER STATIONKEEPRIGHTTCP DEVICE LEGENDFLASHING ARROWFLASHING DOUBLE ARROW(MERGE LEFT OR RIGHT)FLASHING CAUTION1. AN ARROWBOARD SHALL MEET THE MINIMUM SIZE,LEGIBILITY DISTANCE, NUMBER OF ELEMENTS ANDOTHER SPECIFICATIONS SHOWN.2. LENGTH OF ARROW EQUALS 48", WIDTH OFARROWHEAD EQUALS 24".3. TYPE A, B AND C ARROW BOARDS SHALL HAVESOLID RECTANGULAR APPEARANCES. A TYPE DARROW BOARD SHALL CONFORM TO THE SHAPE OFTHE ARROW.4. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES5. SIDEWALK ARE EITHER OPEN OR NOT OPEN. ASIDEWALK IS CLOSED IF A MINIMUM 5' PATH CANNOTBE MAINTAINED MEASURED FROM PROPERTY LINE,OR 5.5' IF CREATED FROM FACE OF CURB.(PEDESTRIAN PATH PROVIDED WHERE REQUIRED)AND WILL BE MONITORED BY A SPOTTER TOENSURE FLOW AND SAFETY DURING WORK UNLESSOTHERWISE NOTED. A SPOTTER SHALL NOT DIRECTTRAFFIC.6. NO EXCEPTION TAKEN- CONTRACTOR ISRESPONSIBLE FOR ADA COMPLIANCE.7. ALL CONTROL SET-UP, SIGN SPACING ANDPROCEDURES. WILL CONFORM TO SPECIFICATIONSSTATED IN THE FEDERAL MANUAL ON UNIFORMEDTRAFFIC CONTROL DEVICES (M.U.T.C.D).8. CITIES AND VARIOUS MUNICIPALITIES MAY HAVEALSO ADOPTED SPECIALIZED GUIDELINES FORTRAFFIC CONTROL WITHIN THEIR JURISDICTION. ITIS THE RESPONSIBILITY OF THE ON-SITE TRAFFICCONTROL PERSONAL TO SEE IF AND ANY SPECIALCONDITIONS EXIST.9. FLAGGERS SHALL BE USED IN ACCORDANCE WITHWAC 468-95-302.10. IF ONLY ONE LANE IS OPEN IN A DIRECTION,THATLANE SHALL BE A MINIMUM OF 11' WIDE, UNLESSSPOTTER/FLAGGERS ARE USED, IN WHICH CASETHE LANE CAN BE A MINIMUM OF 10'.11. ALL ROW WORK MUST YIELD TO SCHOOL TRANSIT,EMPLOYEES AND CHILDREN. WHILE PASSENGERLOADING/UNLOADING, STOPPED OR SLOWING:CEASE WORK, YIELD. WHEN SCHOOL TRANSIT,AND/OR PEDESTRIANS, DEPART COMMENCE WORK.N1. TRAFFIC CONTROL WILLCONSIST OF A ONE LANE,TWO-WAY TRAFFIC WITHFLAGGERS.2. THIS SET UP IS TYPICAL ONHOUSER WAY N.3. SPEED LIMIT : 25MPH㻲㻵㻸㻱㻌㻺㻭㻹㻱㼀㻵㻹㻱㻰㻭㼀㻱㻰㻱㻿㻵㻳㻺㻱㻰㻌㻮㼅㻱㻺㼀㻱㻾㻱㻰㻌㻮㼅㻯㻴㻱㻯㻷㻱㻰㻌㻮㼅㻼㻾㻻㻶㻚㻌㻱㻺㻳㻾㻚㻾㻱㻳㻵㻻㻺㻭㻸㻌㻭㻰㻹㻚㻾㻱㼂㻵㻿㻵㻻㻺 㻰㻭㼀㻱㻮㼅㻿㻴㻱㻱㼀㻻㻲㻿㻴㻱㻱㼀㻿㻼㻚㻱㻚㻌㻿㼀㻭㻹㻼㻌㻮㻻㼄 㻼㻚㻱㻚㻌㻿㼀㻭㻹㻼㻌㻮㻻㼄㻰㻭㼀㻱 㻰㻭㼀㻱㻸㻻㻯㻭㼀㻵㻻㻺㻌㻺㻻㻚㻯㻻㻺㼀㻾㻭㻯㼀㻌㻺㻻㻚㻶㻻㻮㻌㻺㼁㻹㻮㻱㻾㻾㻱㻳㻵㻻㻺㻺㻻㻚㻿㼀㻭㼀㻱㻲㻱㻰㻚㻭㻵㻰㻌㻼㻾㻻㻶㻚㻺㻻㻚㼃㻭㻿㻴㻼㻸㻻㼀㼀㻱㻰㻌㻮㼅Plot 1㼀㻾㻭㻲㻲㻵㻯㻌㻯㻻㻺㼀㻾㻻㻸㻌㻼㻸㻭㻺LEGEND(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERSECTIONS AND DRIVEWAYS.(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.URBAN STREETS35 / 40 MPH25 / 30 MPH45 / 55 MPH60 / 65 MPH50/65TAPER TANGENT10 TO 20MPH㻯㻴㻭㻺㻺㻱㻸㻵㼆㻭㼀㻵㻻㻺㻌㻰㻱㼂㻵㻯㻱㻿㻼㻭㻯㻵㻺㻳㻌㻔㻲㻱㻱㼀㻕35/4525/3010 TO 2010 TO 20 406080㻿㻵㻳㻺㻌㻿㻼㻭㻯㻵㻺㻳㻌㻩㻌㼄㻌㻔㻝㻕RURAL HIGHWAYSRURAL ROADSRURAL ROADS & URBAN ARTERIALSRURAL ROADS, URBAN ARTERIALS,RESIDENTIAL & BUSINESS DISTRICTS25 MPH OR LESS 100' (2)200' (2)350' 500' 800' 㻌㻻㻺㻱㻙㻸㻭㻺㻱㻘㻌㼀㼃㻻㻙㼃㻭㼅㻌㼀㻾㻭㻲㻲㻵㻯㻌㻯㻻㻺㼀㻾㻻㻸㼃㻵㼀㻴㻌㻲㻸㻭㻳㻳㻱㻾㻿FLAGGING STATIONTEMPORARY SIGN LOCATIONCHANNELIZING DEVICESPROTECTIVE VEHICLE1.2.3.4.㻺㻻㼀㻱㻿ALL SIGNS ARE BLACK ON ORANGE.EXTENDING THE CHANNELIZING DEVICE TAPER ACROSSSHOULDER IS RECOMMENDED.NIGHT WORK REQUIRES ADDITIONAL ROADWAY LIGHTING ATFLAGGING STATIONS. SEE THE STANDARD SPECIFICATIONSFOR ADDITIONAL DETAILS.SEE SPECIAL PROVISIONS FOR WORK HOUR RESTRICTIONS.SPEED (MPH) 2530 35 40 455055 60 65 70LENGTH (feet) 250 305 360 425 495 570 645 730155 200TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = RHOST VEHICLE WEIGHT9,900 TO 22,000 lbs.HOST VEHICLE WEIGHT> 22,000 lbs.PROTECTIVE VEHICLE (WORK VEHICLE) = R50' TO 100'6 DEVICEMIN.50' TO 100'6 DEVICEMIN.50' TO300'COMCASTNTSMFP24002619 PROPOSED UNDERGROUND FIBER INSTALLATIONCOMCAST915 HOUSER WAY N RENTON WA 98057915 HOUSER WAY N, RENTON, WA 98057JB0001845475MFP24002619 Know what'sbelow.CallR81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.915 HOUSER WAY N RENTON WA 98057 915 HOUSER WAY N RENTON, WA 98057 JB0001845475REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS: COMCAST JOB NUMBER: STAMPDRAWN BY:CB05/21/2024VICINITY MAP851 HOUSER WAY NRenton,WA 98057CONTACTSPG#SHEET INDEX1COVER SHEET2VICINITY MAP, CONTACTS & SHEET INDEX3GENERAL NOTES4KING COUNTY GENERAL NOTES5LEGEND6SITE-PLAN7SITE-PLAN7N/AN/ADESCRIPTION OF WORKTOTALPROOF & PULL 96 CT FIBER THRU EXISTING CONDUIT (WRECK OUT TEMP)614LFEXISTING VAULTTOTAL:614LFVICINITY MAPBEGIN 925 HOUSER WAYN Renton,WA 98057END2PERMITTINGASHLEY KIEHN4610 TACOMA AVESUMNER, WA 98390PHONE: (253) 999-2271EMAIL: ASKIEHN@SEFNCO.COMCOMCASTSEFNCO OPEDIANE NICAISE4610 TACOMA AVESUMNER, WA 98390PHONE: (253) 389-0920EMAIL: DIANE.NICAISE@MASTEC.COMJOSHUA ASHLEY11308 SW 68TH PKWYTIGARD, OR 97223PHONE: (503) 939-7931EMAIL: JOSHUA_ASHLEY@COMCAST.COMMFP24002619 Know what'sbelow.CallR81148 HOURS BEFORE YOU D IGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.915 HOUSER WAY N RENTON WA 98057 915 HOUSER WAY N RENTON, WA 98057 JB0001845475REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS: COMCAST JOB NUMBER: STAMPDRAWN BY:CB05/21/20247N/AN/AGENERAL NOTES3 THE LOCATIONS OF UTILITIES SHOWN ON THESE DRAWING ARE ONLY APPROXIMATE. SEFNCO HEREBY DISCLAIMS ANYRESPONSIBILITY TO THIRD PARTIES FOR THE ACCURACY OF THIS INFORMATION. PERSONS WORKING IN THE AREACOVERED BY THIS DRAWING MUST CONTACT THE STATEWIDE CALL-BEFORE-YOU-DIG SYSTEM TO ASCERTAIN THELOCATION OF UNDERGROUND UTILITIES PRIOR TO PERFORMING ANY EXCAVATION.1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEEDSITE WORK STANDARDS AND THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LOCAL JURISDICTIONREGULATIONS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEENTHESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE HIGHER QUALITY STANDARDSHALL APPLY. ALL WORK WITHIN PUBLIC R.O.W. OR EASEMENTS MAY REQUIRE INSPECTED AND APPROVED BYTHE LOCAL JURISDICTION INSPECTOR. INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TO BEPROVIDED BY DESIGNEE OF PROJECT SPONSOR/OWNER.2.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTINGUTILITIES, AS SHOWN ON THESE PLANS, IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND,WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED UPON ASBEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE LOCAL UTILITY LOCATION CENTER AT LEAST 48HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF EXISTING UTILITIES. THECONTRACTOR SHALL VERIFY PERTINENT LOCATIONS AND ELEVATIONS, ESPECIALLY AT THE CONNECTIONPOINTS AND AT POTENTIAL UTILITY CONFLICTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TORELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESEPLANS.3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLEAGENCIES. THE CONTRACTOR SHALL NOTIFY THE LOCAL JURISDICTION INSPECTOR AT LEAST 48 HOURS PRIORTO THE START OF ANY EARTH DISTURBING ACTIVITY OR CONSTRUCTION ON ANY AND ALL PUBLICIMPROVEMENTS IF REQUIRED.4.THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE LOCAL JURISDICTION AND ALL UTILITYCOMPANIES WITH REGARD TO RELOCATIONS OR ADJUSTMENTS OF EXISTING UTILITIES DURINGCONSTRUCTION, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION, AND WITH A MINIMUMDISRUPTION OF SERVICE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL PARTIESAFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE.5.THE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THEAPPROPRIATE STANDARDS AND SPECIFICATIONS, AND ONE (1) COPY OF ANY PERMITS AND EXTENSIONAGREEMENTS NEEDED FOR THE JOB ON-SITE AT ALL TIMES.6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO:EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY.7.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR, HISSUBCONTRACTORS, OR OTHER AFFECTED PARTIES WHICH COULD INDICATE A SITUATION THAT IS NOTIDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE ENGINEERIMMEDIATELY.8.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD,UNLESS SPECIFICALLY STATED OTHERWISE.9.FOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY THE LOCAL JURISDICTION, THE CONTRACTORSHALL SUBMIT A TRAFFIC CONTROL AND PHASING PLAN IN ACCORDANCE WITH M.U.T.C.D. FOR APPROVAL.PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN OR AFFECTING THE RIGHT-OF-WAY, THE CONTRACTOR SHALLBE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY SAIDPLANS. PRIOR TO INSTALLATION A PRECONSTRUCTION CONFERENCE SHALL BE HELD WITH LOCALJURISDICTION.10.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THECOMPLETION OF THE INTENDED IMPROVEMENTS SHOWN ON THESE DRAWINGS OR DESIGNATED TO BEPROVIDED, INSTALLED, CONSTRUCTED, REMOVED OR RELOCATED UNLESS SPECIFICALLY NOTED OTHERWISE.11.PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE ANDCLEAR OF ALL CONSTRUCTION DEBRIS AND DIRT TRACKED FROM THE SITE.12.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SET OF RECORDDRAWINGS KEPT AT THE CONSTRUCTION SITE AND AVAILABLE TO THE LOCAL JURISDICTION INSPECTOR AT ALLTIMES.13.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. FOR ADDITIONALINFORMATION CONTACT THE ENGINEER FOR CLARIFICATION AND NOTE ON THE RECORD DRAWINGS.14.ALL EROSION AND SEDIMENT CONTROL (E.S.C.) MEASURES SHALL BE INSTALLED AT THE LIMITS OFCONSTRUCTION PRIOR TO GROUND DISTURBING ACTIVITY. ALL E.S.C. MEASURES SHALL BE MAINTAINED INGOOD REPAIR BY THE CONTRACTOR UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS ARE STABILIZED WITHHARD SURFACE OR LANDSCAPING.15.ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE LOCAL JURISDICTIONENGINEERING DEPARTMENT STANDARD DETAILS AND SPECIFICATIONS.16.ALL CONSTRUCTION OPERATIONS, INCLUDING THE WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR RUNNINGOF TRUCKS, EARTH MOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATEDEQUIPMENT SHALL GENERALLY BE LIMITED TO THE TIME PERIOD APPROVED BY THE LOCAL JURISDICTION.17.CALL THE "CALL BEFORE YOU DIG" NUMBER 48HRS IN ADVANCE AT 1-800-424-5555 PRIOR TO DIGGING.RENTON1.ALL METHODS AND MATERIALS SPECIFICATION SHALL MEET ALL CITY OF RENTON STANDARDS.2.ALL RENTON STANDARD DETAIL DRAWINGS CAN BE FOUND AT THE FOLLOWING WEBSITE:https://edocs.rentonwa.gov/Documents/Browse.aspx?startid=13637033.ALL ASPHALT REPAIR TO BE DONE IN ACCORDANCE WITH RENTON STANDARDS. SEE RENTON STANDARD DETAIL -SECTION F 110.0-110.2.4.ALL SIDEWALK REPAIR TO BE DONE IN ACCORDANCE WITH RENTON STANDARDS. SEE RENTON STANDARD DETAIL- SECTION F 102.0.5.ALL CURB AND GUTTER REPAIR TO BE DONE IN ACCORDANCE WITH RENTON STANDARDS. SEE RENTONSTANDARD DETAIL - SECTION F 103.0.6.UTILITY LOCATIONS SHOWN ON THIS PLAN ARE BASED ON DOCUMENT RESEARCH AND FIELD EVALUATION. THEINFORMATION MAY NOT BE ACCURATE OR COMPLETE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PHYSICALLYLOCATE AND VERIFY LOCATION AND DEPTH OF ALL UTILITIES WITHIN THE CONSTRUCTION PATH. ALLINSTALLATIONS MUST COMPLY WITH MINIMUM HORIZONTAL AND VERTICAL CLEARANCES FROM UTILITIES.MFP24002619 4Know what'sbelow.CallR81148 HOURS BEFORE YOU D IGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.915 HOUSER WAY N RENTON WA 98057 915 HOUSER WAY N RENTON, WA 98057 JB0001845475REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS: COMCAST JOB NUMBER: STAMPDRAWN BY:CB05/21/20247N/AN/AKING COUNTY GENERAL NOTES THE LOCATIONS OF UTILITIES SHOWN ON THESE DRAWING ARE ONLY APPROXIMATE. SEFNCO HEREBY DISCLAIMS ANYRESPONSIBILITY TO THIRD PARTIES FOR THE ACCURACY OF THIS INFORMATION. PERSONS WORKING IN THE AREACOVERED BY THIS DRAWING MUST CONTACT THE STATEWIDE CALL-BEFORE-YOU-DIG SYSTEM TO ASCERTAIN THELOCATION OF UNDERGROUND UTILITIES PRIOR TO PERFORMING ANY EXCAVATION.1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEED SITEWORK STANDARDS AND THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LOCAL JURISDICTION REGULATIONSAND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THESPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE HIGHER QUALITY STANDARD SHALL APPLY. ALL WORK WITHINPUBLIC R.O.W. OR EASEMENTS MAY REQUIRE INSPECTED AND APPROVED BY THE LOCAL JURISDICTION INSPECTOR.INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TO BE PROVIDED BY DESIGNEE OF PROJECTSPONSOR/OWNER.2.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES, ASSHOWN ON THESE PLANS, IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE,MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED UPON AS BEING EXACT OR COMPLETE.THE CONTRACTOR MUST CALL THE LOCAL UTILITY LOCATION CENTER AT LEAST 48 HOURS BEFORE ANY EXCAVATIONTO REQUEST EXACT FIELD LOCATIONS OF EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY PERTINENTLOCATIONS AND ELEVATIONS, ESPECIALLY AT THE CONNECTION POINTS AND AT POTENTIAL UTILITY CONFLICTS. ITSHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THEPROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLEAGENCIES. THE CONTRACTOR SHALL NOTIFY THE LOCAL JURISDICTION INSPECTOR AT LEAST 48 HOURS PRIOR TO THESTART OF ANY EARTH DISTURBING ACTIVITY OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS IFREQUIRED.4.THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE LOCAL JURISDICTION AND ALL UTILITY COMPANIESWITH REGARD TO RELOCATIONS OR ADJUSTMENTS OF EXISTING UTILITIES DURING CONSTRUCTION, TO ASSURE THATTHE WORK IS ACCOMPLISHED IN A TIMELY FASHION, AND WITH A MINIMUM DISRUPTION OF SERVICE. THECONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITYSERVICE.5.THE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATESTANDARDS AND SPECIFICATIONS, AND ONE (1) COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FORTHE JOB ON-SITE AT ALL TIMES.6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO:EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY.7.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR, HISSUBCONTRACTORS, OR OTHER AFFECTED PARTIES WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED INTHE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY.8.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD,UNLESS SPECIFICALLY STATED OTHERWISE.9.FOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY THE LOCAL JURISDICTION, THE CONTRACTOR SHALLSUBMIT A TRAFFIC CONTROL AND PHASING PLAN IN ACCORDANCE WITH M.U.T.C.D. FOR APPROVAL. PRIOR TO ANYCONSTRUCTION ACTIVITIES WITHIN OR AFFECTING THE RIGHT-OF-WAY, THE CONTRACTOR SHALL BE RESPONSIBLEFOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY SAID PLANS. PRIOR TOINSTALLATION A PRECONSTRUCTION CONFERENCE SHALL BE HELD WITH LOCAL JURISDICTION.10.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETIONOF THE INTENDED IMPROVEMENTS SHOWN ON THESE DRAWINGS OR DESIGNATED TO BE PROVIDED, INSTALLED,CONSTRUCTED, REMOVED OR RELOCATED UNLESS SPECIFICALLY NOTED OTHERWISE.11.PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE AND CLEAR OFALL CONSTRUCTION DEBRIS AND DIRT TRACKED FROM THE SITE.12.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SET OF RECORD DRAWINGSKEPT AT THE CONSTRUCTION SITE AND AVAILABLE TO THE LOCAL JURISDICTION INSPECTOR AT ALL TIMES.13.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. FOR ADDITIONALINFORMATION CONTACT THE ENGINEER FOR CLARIFICATION AND NOTE ON THE RECORD DRAWINGS.14.ALL EROSION AND SEDIMENT CONTROL (E.S.C.) MEASURES SHALL BE INSTALLED AT THE LIMITS OF CONSTRUCTIONPRIOR TO GROUND DISTURBING ACTIVITY. ALL E.S.C. MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THECONTRACTOR UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS ARE STABILIZED WITH HARD SURFACE ORLANDSCAPING.15.ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE LOCAL JURISDICTIONENGINEERING DEPARTMENT STANDARD DETAILS AND SPECIFICATIONS.16.ALL CONSTRUCTION OPERATIONS, INCLUDING THE WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR RUNNING OFTRUCKS, EARTH MOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATED EQUIPMENT SHALLGENERALLY BE LIMITED TO THE TIME PERIOD APPROVED BY THE LOCAL JURISDICTION.17.CALL THE "CALL BEFORE YOU DIG" NUMBER 48HRS IN ADVANCE AT 1-800-424-5555 PRIOR TO DIGGING.KING COUNTY1.ALL DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH PERMIT CONDITIONS, THE KING COUNTY CODE(KCC), ROAD STANDARDS (KCRS), WASHINGTON STATE DOT (WSDOT) STANDARD SPECIFICATIONS AND THECONDITIONS OF PRELIMINARY APPROVAL. IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT AND THEPROFESSIONAL CIVIL ENGINEER TO CORRECT ANY ERROR, OMISSION, OR VARIATION FROM THE ABOVEREQUIREMENTS FOUND IN THESE PLANS. ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST OR LIABILITY TOKING COUNTY.2.THE DESIGN ELEMENTS WITHIN THESE PLANS HAVE BEEN REVIEWED ACCORDING TO THE KING COUNTYDEPARTMENT OF DEVELOPMENT AND ENVIRONMENTAL SERVICES (DDES) ENGINEERING REVIEW CHECKLIST. SOMEELEMENTS MAY HAVE BEEN OVERLOOKED OR MISSED BY THE DDES PLAN REVIEWER. ANY VARIANCE FROMADOPTED STANDARDS IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY KING COUNTY PRIOR TOCONSTRUCTION.3.APPROVAL OF THIS ROAD, GRADING, PARKING AND DRAINAGE PLAN DOES NOT CONSTITUTE AN APPROVAL OF ANYOTHER CONSTRUCTION (E.G. DOMESTIC WATER CONVEYANCE, SEWER CONVEYANCE, GAS, ELECTRICAL, ETC.)4.BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, A PRECONSTRUCTION MEETING MUST BE HELDBETWEEN THE DDES'S LAND USE INSPECTION SECTION, THE APPLICANT, AND THE APPLICANT'S CONSTRUCTIONREPRESENTATIVE.5.A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.6.GRADING ACTIVITIES (SITE ALTERATION) ARE LIMITED TO THE HOURS OF 7 A.M. TO 7 P.M. MONDAY THROUGHSATURDAY AND 10 A.M. TO 5 P.M. ON SUNDAY, UNLESS OTHERWISE APPROVED WITH A WRITTEN DECISION BY THEREVIEWING AGENCY.7.IT SHALL BE THE APPLICANT'S/CONTRACTOR'S RESPONSIBILITY TO OBTAIN ALL CONSTRUCTION EASEMENTSNECESSARY BEFORE INITIATING OFF-SITE WORK. EASEMENTS REQUIRE REVIEW AND APPROVAL PRIOR TOCONSTRUCTION.8.FRANCHISED UTILITIES OR OTHER INSTALLATIONS THAT ARE NOT SHOWN ON THESE APPROVED PLANS SHALL NOTBE CONSTRUCTED UNLESS AN APPROVED SET OF PLANS THAT MEET ALL REQUIREMENTS OF KCRS CHAPTER 8 ARESUBMITTED TO THE DDES'S LAND USE INSPECTION SECTION THREE DAYS PRIOR TO CONSTRUCTION.9.DATUM SHALL BE KCAS UNLESS OTHERWISE APPROVED BY DDES.10.DEWATERING SYSTEM (UNDERDRAIN) CONSTRUCTION SHALL BE WITHIN A RIGHT-OF-WAY OR APPROPRIATEDRAINAGE EASEMENT, BUT NOT UNDERNEATH THE ROADWAY SECTION. ALL UNDERDRAIN SYSTEMS MUST BECONSTRUCTED IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATIONS.11.ALL UTILITY TRENCHES AND ROADWAY SUBGRADE SHALL BE BACKFILLED AND COMPACTED TO 95 PERCENTDENSITY, STANDARD PROCTOR.12.OPEN CUTTING OF EXISTING ROADWAYS FOR NON-FRANCHISED UTILITY OR STORM WORK IS NOT ALLOWEDUNLESS SPECIFICALLY APPROVED BY DDES AND NOTED ON THESE APPROVED PLANS. ANY OPEN CUT SHALL BERESTORED IN ACCORDANCE WITH KCRS.13.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, SAFETY DEVICES,PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH, ANDSAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORKCOVERED BY THE CONTRACTOR. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT NORMALTRAFFIC FLOW SHALL REQUIRE AT LEAST ONE FLAGGER FOR EACH LANE OF TRAFFIC AFFECTED. MANUAL ONUNIFORM TRAFFIC CONTROL DEVICES (MUTCD) SHALL APPLY. WORK IN RIGHT-OF-WAY IS NOT AUTHORIZED UNTIL ATRAFFIC CONTROL PLAN IS APPROVED BY KING COUNTY.MFP24002619 Know what'sbelow.CallR81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig. 915 HOUSER WAY N RENTON WA 98057 915 HOUSER WAY N RENTON, WA 98057 JB0001845475REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS: COMCAST JOB NUMBER: STAMPDRAWN BY:CB05/21/20247N/AN/ALEGEND 5LEGENDTELECOMMUNICATIONSANITARY SEWERGAS LINEWATERSTORM DRAINRECYCLED WATERPOWERPARCEL LINERIGHT OF WAYDITCH LINECENTER LINEEDGE OF PAVEMENTFACE OF CURBPROPERTY LINELIP OF GUTTERGUARDRAILSDSDWWSSSSGGTTLIPD/LEOPFOCRWRWBUILDING OUTLINEPFLFOG LINESIDEWALKSWSWTRENCHDIRECT BOREPROPOSED AERIAL STRAND PROOF/PULLPROPOSED OVERLASHMINOR ARTERIALCOLLECTOR ARTERIALINTERSTATE FREEWAYACCESS STREETPRINCIPAL ARTERIALBUILDINGR/WWARNING SIGN PLACEMENT (W/ PART #)TRAFFIC BARRELHYDRO-VAC TRENCHKEEPRIGHTREGULATORY SIGN (W/ PART #)LIMITSPEEDR2-125SPEED LIMIT CALLOUTSIGN PLACEMENT / DIRECTIONTRAFFIC CONEFLAGGER STATIONFLAGGER STATIONPATROL CARPOLICEOFFICERUNIFORMED POLICE OFFICERWORK VEHICLEFENCESTREET LIGHT HANDHOLETELECOM MANHOLETELECOM HANDHOLETELECOM CABINETTRAFFIC SIGNAL MANHOLETRAFFIC CABINETTRAFFIC SIGNAL PEDESTALSTREET LIGHT POLETRAFFIC SIGNAL HANDHOLECATV MANHOLECATV HANDHOLECATV PEDESTALTRAFFIC SIGNAL POLESTORM MANHOLEWATER VALVEWATER METERTELECOM PEDESTALSTORM INLETSTORM DRAIN UNKNOWN D?SISEWER VALVESSEWER VAULT SSSEWER UNKNOWN S?STORM DRAIN VAULT SDSEWER CLEANOUTSEWER MANHOLESCSEWER CATCH BASIN SSSTORM ACCESS POINTBASE LAYERSEXISTING UTILITIESROAD HATCH CLASSIFICATIONROW WORK LINETYPECOMCAST UNDERGROUND SYMBOLSEXISTING UTILITY SYMBOLSTRAFFIC CONTROL SYMBOLSSTORM CATCH BASIN SDTRAFFIC SIGNAL VAULTGAS METERTEST VALVEPEDESTAL UNK UTILITYFIRE HYDRANTGAS VALVEGAS TEST POINTGAS MANHOLEWATER PUMPGGGWATER AIR CONTROL VALVEWATER WELLWATER SAMPLING STATIONPOWER HANDHOLEPOWER MANHOLEPOWER CABINETPOWER VAULTPOWER PEDESTALPPOWER UNKNOWN PPPPPP?SIGN POSTCULVERTTRANSIT STOPBUSSTOPDRIVEWAY (FOC OR EOP)SDSSANCHORSIDEWALK ANCHOR & GUY(P) FIBER & COUNTF48(P) .625 COAX(P) .875 COAXCOMCAST AERIAL SYMBOLSPROPOSEDEXISTINGWRECKOUTPOLE W/O RISERRISERARMVERTICAL GROUNDSLACK SPANOVERHEAD GUYTANGENT ATTACHMENTDEAD-ENDDOUBLE DEAD-END(E) FIBER & COUNTF48(E) .625 COAX(E) .875 COAXSLSLTSTSTSTSCCCTTTTTSTS?PUMPFWELLTREE TRIMLIGHT/MEDIUM/HEAVYLMH//WRECKOUTVAULTSPLICE CASEMANHOLEPEDESTALPPPAMINIBRIDGERTTTAATAPAMPLIFER POTHOLEBORE PIT / EXCAVATIONMMMPROPOSEDEXISTINGWRECKOUTNODENode SymbolABCDNode SymbolSTORAGE LOOPX'X'LIT INTERSECTIONFASFLASHING ARROWSEQUENTIAL ARROWSEQUENTIAL CHEVRONFLASHING DOUBLE ARROW(MERGE LEFT OR RIGHT)FLASHING CAUTIONORFLASHING DIAMOND CAUTIONARROWBOARD PLACEMENT (SEE BELOW)CHANNELIZING DEVICES / MIN DIMENSIONSNOTE(S):1.AN ARROWBOARD SHALL MEET THE MINIMUM SIZE, LEGIBILITYDISTANCE, NUMBER OF ELEMENTS AND OTHERSPECIFICATIONS SHOWN.2.LENGTH OF ARROW EQUALS 48", WIDTH OF ARROWHEADEQUALS 24".3.TYPE A, B AND C ARROW BOARDS SHALL HAVE SOLIDRECTANGULAR APPEARANCES. A TYPE D ARROW BOARDSHALL CONFORM TO THE SHAPE OF THE ARROW.ARROWBOARD TYPE MIN LEGIBILITYDISTANCEMIN SIZE MINIMUM# OFELEMENTSABCD48"×24"60"×30"96"×48"NONE12 MILE1 MILE34 MILE12 MILE121315125FT MIN4FT MIN8-12"45°TYPE 3 BARRICADE3FT MIN45°2FT MIN8-12"TYPE 1 BARRICADE3FT MIN8-12"2FT MIN45°TYPE 2 BARRICADE3-4"6"2"4"28'-36" MAXSPEED < 45MPHNIGHT AND/OR FREEWAYMORE THAN 36"4-6" TYPCONECONESPEED ≥ 45MPHDIRECTION INDICATOR BARRICADE12"8"36" MIN 24" MIN45°UNLIT INTERSECTIONDBTRENCHAVAC-TSPOTTER STATIONALL TRAFFIC CONTROL DEVICES / ANNOTATIONS PER MUTCDAMPLIFIER PICTURETAP PICTUREEquipmentMFP24002619 R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/WEOP EOPEOPEOPEOP EOPSWSWSWSWSW SW SWSWSWEOPEOPEOPEOPEOP EOPEOPSWSWSWSWSW SW SWSWSW168'925 HOUSER WAY N302'S MELBOURNE ST919 HOUSER WAY N915 HOUSER WAY NKnow what 'sbelow.CallR81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.915 HOUSER WAY N RENTON WA 98057 915 HOUSER WAY N RENTON, WA 98057 JB0001845475REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS: COMCAST JOB NUMBER: STAMPDRAWN BY:CB05/21/20247SITE PLAN - 1 EXISTING VAULT126SITE PLAN CONSTRUCTION NOTESPROOF & PULL 96 CT FIBER THRUEXISTING CONDUITN2211MFP24002619 R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/WR/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W EOPEOPEOPEOPEOPEOPEOPSWSWSWSWSWSWSWSWSWSWSWSWSWSWEOPEOPEOPEOPEOPEOPSWSWSWSWSWSWSWSWSWSWSWSWSWSWS MELBOURNE ST302'94'50'915 HOUSER WAY N903 HOUSER WAY N851 HOUSER WAY NKnow what 'sbelow.CallR81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.915 HOUSER WAY N RENTON WA 98057 915 HOUSER WAY N RENTON, WA 98057 JB0001845475REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS: COMCAST JOB NUMBER: STAMPDRAWN BY:CB05/21/20247SITE PLAN - 2 7NEXISTING VAULT12SITE PLAN CONSTRUCTION NOTESPROOF & PULL 96 CT FIBER THRUEXISTING CONDUIT222111MFP24002619