HomeMy WebLinkAboutAddendum - 6AMENDMENT NO. _6_ TO AGREEMENT FOR COULON
MEMORIAL BEACH PARK NORTH WATER WALK
IMPROVEMENTS
THIS AMENDMENT, dated for reference purposes only as __________________, 202 , is by
and between the City of Renton (the City), a Washington municipal corporation, and
PND Engineers, Inc. (Consultant), a Washington corporation. The City and the
Consultant are referred to collectively in this Amendment as the Parties. Once fully
executed by the Parties, this Amendment is effective as of the last date signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-20-010, dated
January 13, 2020, to provide necessary services for the Coulon Memorial Beach North Water
Walk Improvements (referred to herein as the Agreement);
Whereas, the Parties wish to amend the Agreement to change the scope of work, change the
time for performance, and change the compensation in order to provide professional services
associated with design, permitting, bidding, and construction administration for the above
referenced project.
NOW THEREFORE, It is mutually agreed upon that CAG-20-010 is amended as follows:
1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit
A-6, which is attached and incorporated herein.
2.Time of Performance:Section 3, Time of Performance, is amendedto complete the scope
of services per the agreement CAG-20-010. All Work shall be performed by no later than
August 30, 2024.
3. Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased by $_6,736.06_ from $549,195.96 to
$_555,932.02, plus any applicable state and local sales taxes. The additional
compensation shall be paid based upon Work actuallyperformed according to the rate(s)
or amounts specified in Exhibit A-6 of the Agreement.
4.All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
CAG-20-010, Adden #6-24
July 11
PAGE 2 OF 2
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date
last signed by the Parties below.
CITY OF RENTON
By:_____________________________
CONSULTANT
By:____________________________
Maryjane Van Cleave Jon B. Keiser
Vice President
_____________________________
Date
_____________________________
Date
Approved as to Legal Form
By: __________________________
Shane Moloney
Renton City Attorney
Contract Template Updated 06/17/2021
Approved by Cheryl Beyer via email 7/3/2024
PND ENGINEERS, INC.
SEATTLE STANDARD RATE SCHEDULE
EFFECTIVE JANUARY 2024
Professional:Staff Engineer I $116.00
Staff Engineer II $134.00
Staff Engineer III $144.00
Staff Engineer IV $150.00
Staff Engineer V $155.00
Staff Engineer VI $173.00
Senior Engineer I $168.00
Senior Engineer II $179.00
Senior Engineer III $192.00
Senior Engineer IV $206.00
Senior Engineer V $225.00
Senior Engineer VI $246.00
Senior Engineer VII $265.00
Environmental Scientist I $121.00
Environmental Scientist II $144.00
Environmental Scientist III $163.00
Environmental Scientist IV $179.00
Environmental Scientist V $197.00
Environmental Scientist VI $207.00
Surveyors:Senior Land Surveyor I $134.00
Senior Land Surveyor II $144.00
Senior Land Surveyor III $155.00
Technicians:Technician I $68.00
Technician II $100.00
Technician III $110.00
Technician IV $121.00
Technician V $150.00
Technician VI $173.00
CAD Designer III $100.00
CAD Designer IV $116.00
CAD Designer V $139.00
CAD Designer VI $150.00
Expenses:
Mileage: Current Federal IRS Rate
Expenses and Subconsultants: Direct Cost, Plus 10%