Loading...
HomeMy WebLinkAboutVarma SFR (C23001527) - Construction Close Out CompleteHello Kushal, All construction work associated with the Varma SFR has been completed and the City has signed off on the Construction Portion of the Civil Construction Permit today. Please note that with the sign off of this permit, your 2-year Maintenance Period begins today with your maintenance period ending on 07/10/2026. If you have any questions, please let us know. SAMUEL MORMAN | Civil Engineer II City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=17625638> | Online Applications and Inspections <https://permitting.rentonwa.gov/#/home> (425) 430-7383 | SAMorman@rentonwa.gov