Minor Franchise Permit: MFP24003278
IVR Number: 24003278
Permit Information
Permit Name: P.24049773 - 1622 Blaine Ave NE
Address/Location:06/27/2024Application Date:6882200170Parcel Number: 1622 BLAINE AVE NE
Permit Type:07/17/2024Issue Date:Franchise
Permit Work Class:07/17/2025Expiration Date:Minor Utility
Job Number: 24049773Franchise Type:Telephone
Description: Placement of underground telephone service wire to our customer. Pothole all existing utilities. Restoration per City
of Renton standards.
Contacts
Name Address PhoneTypeBilling
Marites Parin
Lumen
B: (360) 626-0274Applicant
Nathan Macleod
Lumen
7850 S Trafton St, Bldg B
Tacoma, WA 98409
C: (253) 583-6283ApplicantX
Kim Parker
QWest Corporation
931 14th St, Suite 1000A
Denver, CO 80202
B: (303) 992-0752Contact
Cheyenne Classen
North Sky Communications
2112 97th Ave E
Tacoma, WA 98444
Contact
Nathan Macleod
Lumen
7850 S Trafton St, Bldg B
Tacoma, WA 98409
C: (253) 583-6283Contact
Michael Smith
North Sky Communications
21320 84th Ave S
Kent, WA 98032
C: (206) 305-5881Contractor
Business License Number: 36846Construction Contractor: NORTHSC857Q4
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
QWest/Century Link - Billing 23315 66th Ave S
Kent, WA 98032
Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
X
X
24049773
1622 BLAINE AVE NE
7/29/2024 8/2/2024 8:00 AM 5:00 PM
NORTH SKY COMMUNICATIONS, LLC
Heather Huskey 360-450-3287
16701 SE McGillivray Blvd., Ste. 200 Vancouver/WA 98661
Permit is for the placement of underground telephone service wire to our customer.
MFP24003278
Monday Friday 3:00pm
Scott Warlick CED 7/17/2024
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
7/11/2024
Marites Parin
Traffic Control PlannerElite Traffic Solutions206-922-9205julian@elitetrafficsolutions.comRentonKing Cover Sheet1:50CMS 24094773 98056
Scope of Work: Boring & TrenchingTraffic Control Plan: Cover Sheet
(1) All spacing may be adjusted to accommodate interchange ramps, at-grade intersections, and driveways.(2) This spacing may be reduced in urban areas to fit roadway conditions.
RURAL HIGHWAYSRURAL ROADSRURAL ROADS & URBAN ARTERIALSRURAL ROADS, URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSALL SIGNS ARE 48'' X 48'' BLACK ON ORANGE UNLESS OTHERWISEDESIGNATED.
60/65 MPH45/55 MPH35/40 MPH25/30 MPH25 MPH OR LESS 800'SIGN SPACING=X (FEET) (1)500'350'200'100'(2)(2)
FREEWAYS & EXPRESSWAYS 55/70 MPH 1500 (OR ASPER MUTCD)MINIMUM TAPER LENGTH (L) IN FEETLaneWidthFeetPosted Speed (mph)101112 25 30 35 40 45 50 55 60 65 70105115125150165180205225245265295320450495540500550600550605660660720780840
BUFFER DATALONGITUDINAL BUFFER SPACE = BSPEED (MPH)LENGTH (FEET)25 30 35 40 45 50 55 60 65 70155200250305360425495570645730
CHANNELIZING DEVICE SPACING (FEET)MPH TAPER TANGENT50/7035/4525/30 403020 806040 General Notes:1. All signs and spacing shall conform to The MUTCD and WAC.2. Priority passage through the work area for emergencyvehicles vehicles shall be provided at all times.3. Alert Metro Transit 5 days in advance4. Protective vehicle recommended may be a work vehicle.5. Devices should not encroach into adjacent lanes.6. All signs min. 36 x 36 B/O unless otherwise specified.7. Channelization devices are 28" reflective cones8. All sign spacing may be adjusted to accommodate at-gradeintersections and/or driveways.9. Traffic Control Supervisor required for ROW impacts.06/4/2024 by:Elite Traffic Solutions206.922.9205Julian MoralesTCS #012813Exp.4/30/2025Juʙiʋn MoralesAll Signs & Spacing to conform to the MUTCD Standards-reference WSDOT"Work Zone Traffic Control Guidelines M54-44.04 January 2021" & The City of Renton's Standards.
SHEET 1 SHEET 2
www.invarion.comMFP24003278
1622 BLAINE AV NE
32'
22'
ROADWORKAHEADW20-1
SHOULDERWORKW21-5
ROADWORKAHEADW20-1
X
X
L/3
BLAINE AV NE25MPH
S8'30'80'NO PARK 24 HRS NOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555R7-T3980'NO PARK 24 HRSNOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555R7-T39
1717 BLAINE AV NE
LegendConeSign StandSSpotterWork Area
Traffic Control PlannerElite Traffic Solutions206-922-9205julian@elitetrafficsolutions.comRentonKing 1 021:50CMS 24094773 98056
Scope of Work: BoringTraffic Control Plan: Shoulder Closure
Plan Scale1 : 600 (1'' = 50')
(1) All spacing may be adjusted to accommodate interchange ramps, at-grade intersections, and driveways.(2) This spacing may be reduced in urban areas to fit roadway conditions.
RURAL HIGHWAYSRURAL ROADSRURAL ROADS & URBAN ARTERIALSRURAL ROADS, URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSALL SIGNS ARE 48'' X 48'' BLACK ON ORANGE UNLESS OTHERWISEDESIGNATED.
60/65 MPH45/55 MPH35/40 MPH25/30 MPH25 MPH OR LESS 800'SIGN SPACING=X (FEET) (1)500'350'200'100'(2)(2)
FREEWAYS & EXPRESSWAYS 55/70 MPH 1500 (OR ASPER MUTCD)MINIMUM TAPER LENGTH (L) IN FEETLaneWidthFeetPosted Speed (mph)101112 25 30 35 40 45 50 55 60 65 70105115125150165180205225245265295320450495540500550600550605660660720780840BUFFER DATALONGITUDINAL BUFFER SPACE = BSPEED (MPH)LENGTH (FEET)25 30 35 40 45 50 55 60 65 70155200250305360425495570645730 CHANNELIZING DEVICE SPACING (FEET)MPH TAPER TANGENT50/7035/4525/30 403020 806040Pedestrian Escort: Stop work, secure passableADA compliant Pedestrian access on existingsidewalk (4' min.). Clear zone must be free ofoverhead hazards when Pedestrians are movingthrough the work area.
General Notes:1. All signs and spacing shall conform to The MUTCD and WAC.2. Priority passage through the work area for emergencyvehicles vehicles shall be provided at all times.3. Alert Metro Transit 5 days in advance4. Protective vehicle recommended may be a work vehicle.5. Devices should not encroach into adjacent lanes.6. All signs min. 36 x 36 B/O unless otherwise specified.7. Channelization devices are 28" reflective cones8. All sign spacing may be adjusted to accommodate at-gradeintersections and/or driveways.9. Traffic Control Supervisor required for ROW impacts.
06/4/2024 by:Elite Traffic Solutions206.922.9205Julian MoralesTCS #012813Exp.4/30/2025Juʙiʋn Morales
50' BORE
All Signs & Spacing to conform to the MUTCD Standards-reference WSDOT"Work Zone Traffic Control Guidelines M54-44.04 January 2021" & The City of Renton's Standards.
SPOTTER SHALL ASSIST PEDESTRIANSTHROUGH WORKZONE SAFELY.SIDEWALK WILL REMAIN OPEN AT ALL TIMES.
www.invarion.comMFP24003278
180'NO PARK24 HRS1622 BLAINE AV NE
32'
22'
ROADWORKAHEADW20-1
SHOULDERWORKW21-5
B
X
X
L/3
8'30'
ROADWORKAHEADW20-1
BLAINE AV NE25MPH
S
1701 BLAINE AV NE
NO PARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555R7-T39180'NO PARK24 HRSNOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555R7-T39
LegendConeSign StandSSpotterWork Area
Traffic Control PlannerElite Traffic Solutions206-922-9205julian@elitetrafficsolutions.comRentonKing 2 021:50CMS 24094773 98056
Scope of Work: TrenchingTraffic Control Plan: Shoulder Closure
Plan Scale1 : 600 (1'' = 50')
(1) All spacing may be adjusted to accommodate interchange ramps, at-grade intersections, and driveways.(2) This spacing may be reduced in urban areas to fit roadway conditions.
RURAL HIGHWAYSRURAL ROADSRURAL ROADS & URBAN ARTERIALSRURAL ROADS, URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSALL SIGNS ARE 48'' X 48'' BLACK ON ORANGE UNLESS OTHERWISEDESIGNATED.
60/65 MPH45/55 MPH35/40 MPH25/30 MPH25 MPH OR LESS 800'SIGN SPACING=X (FEET) (1)500'350'200'100'(2)(2)
FREEWAYS & EXPRESSWAYS 55/70 MPH 1500 (OR ASPER MUTCD)MINIMUM TAPER LENGTH (L) IN FEETLaneWidthFeetPosted Speed (mph)101112 25 30 35 40 45 50 55 60 65 70105115125150165180205225245265295320450495540500550600550605660660720780840BUFFER DATALONGITUDINAL BUFFER SPACE = BSPEED (MPH)LENGTH (FEET)25 30 35 40 45 50 55 60 65 70155200250305360425495570645730 CHANNELIZING DEVICE SPACING (FEET)MPH TAPER TANGENT50/7035/4525/30 403020 806040Pedestrian Escort: Stop work, secure passableADA compliant Pedestrian access on existingsidewalk (4' min.). Clear zone must be free ofoverhead hazards when Pedestrians are movingthrough the work area.
General Notes:1. All signs and spacing shall conform to The MUTCD and WAC.2. Priority passage through the work area for emergencyvehicles vehicles shall be provided at all times.3. Alert Metro Transit 5 days in advance4. Protective vehicle recommended may be a work vehicle.5. Devices should not encroach into adjacent lanes.6. All signs min. 36 x 36 B/O unless otherwise specified.7. Channelization devices are 28" reflective cones8. All sign spacing may be adjusted to accommodate at-gradeintersections and/or driveways.9. Traffic Control Supervisor required for ROW impacts.
06/4/2024 by:Elite Traffic Solutions206.922.9205Julian MoralesTCS #012813Exp.4/30/2025Juʙiʋn Morales
70' TRENCH
All Signs & Spacing to conform to the MUTCD Standards-reference WSDOT"Work Zone Traffic Control Guidelines M54-44.04 January 2021" & The City of Renton's Standards.
SPOTTER SHALL ASSIST PEDESTRIANSTHROUGH WORKZONE SAFELY.SIDEWALK WILL REMAIN OPEN AT ALL TIMES.
CONSTRUCTION SHALL NOTIFY RESIDENTS DRIVEWAYTHAT IS AFFECTED BY THE WORK OF DATES & TIMES.
www.invarion.comMFP24003278
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
MFP24003278