Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutReport 2 - 1 of 71. PROJECT OVERVIEW:
Evendell is located between 156 1
h Avenue SE and 1601
h Avenue SE on the south side of
the unimproved ROW of SE 1361h Street within Section 14, Township 23N, Range SE in
King County, Washington. See attached vicinity map. The 13.8-acre property is
currently occupied by two single-family residences with associated outbuildings.
Existing ground cover consists of a combination of forest, pasture, lawn, and landscaping.
A wetland is also located at the northeast comer of the site. A boundary line adjustment
will be completed to except one existing residence located along 1561h Avenue SE. The
second residence will be included within a proposed lot within the development.
Proposed development of the property will include the demolition of all structures on the
property except for the excepted residence and the house within proposed Lot 52 and
construction of 70 proposed single-family lots, 69 new and I existing residence lot, along
with associated open space, roadway and utilities. Along with site improvements, an 8'
wide shoulder will be added to l 60'h Avenue SE and SE 136 1h Street will be constructed
through the existing unimproved ROW along the property's frontage.
A drainage basin ridge runs through the property separating the onsite drainage into two
drainage basins. On-site generated runoff will be directed to one of two detention/water
quality facilities. A small amount of upstream area is tributary to the eastern portion of
the site and will be routed through the detention/water quality facility. Level 2 Flow
Control will be utilized for the East Basin along with downstream improvements. Level
3 Flow Control will be utilized for the West Basin. Both basins will be treating the
drainage with Basic Water Quality Treatment.
King County Department of Development and.Environmental Services
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
ParU .·P.ROJECTOWNERAND-
PROUECTENGINEER . . . :· . ···,,i.,:·:-.. -..
Project Owner
SRI Developing, I,I,C
Address
PO Box 73790, Puyallup, WA
Phone
253-539-8116
Project Engineer
David Cayton. P.E.
Company Core_ Design, Inc.
Part 2 PROJECT LOCATION AND
DESCRIPTION.
Project Name
Evendell
Location
Township __ 2~3~N __ _
Range SE
............. Section ___ 1_4 ___ _
Address/Phone14711 NE 29th Pl, Se 101, Bellevue, WA 425-885-787'
x Subdivison
Short Subdivision
Grading
Commercial
Other ________ _
PartA .OTHER REVIEWS AND PERM.ITS
DFW HPA Shoreline Management
COE 404 (Rockery '\
DOE Dam Safety <'Structural Vaults)
FEMA Floodplain Other
COE Wetlands
Part 5 SITE COMMUNITY AND.DRAINAGE BASIN
.
Community
Ni:::i.wc~ .... -1-1 o
Drainage Basin
Lower .. Cedar River
Part6}plTE···~W,flACTERIST1pS·.
.
River
Stream __________ _
Critical Stream Reach
Depressions/Swales
Lake-'-----------~
Steep Slopes---------
Floodplain ________ _
Wetlands __ ..,Jt'c:!-____ '---
Seeps/Springs
High Groundwater Table
Groundwater Recharge
Other __________ _
ParVi SOl[S . . . ;. ' .. ":~
Soil Type
Alderwood (AGC)
Slopes
6-15%
Additional Sheets Attached
. ,. .
.Part 8. DEVEL:OPMENTLIMITATIONS
REFERENCE
Ch. 4 -·oownstream Analysis
Additional Sheets Attached
.
Erosion Potential
Moderate
Erosive Velcoties
LIMITATION/SITE CONSTRAINT
.
~----------~-----------------'-------_j
Part 9 ESC REQUIREMENTS .
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
Sedimentation Facilities
Stabilized Construction Entrance
Perimeter Runoff Control
Clearing and Graing Restrictions
Cover Practices
Construction Sequence
Other
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
Stabilize Exposed Surface
Remove and Restore Temporary ESC Facilities
Clean and Remove All Silt and Debris
Ensure Operation of Permanent Facilities
Flag Limits of SAO and open space
preservation areas
Other
" ... _.·,: ··. ·' ' ., .· ... " · ...
Pardo< SURFAyl=WATER S)'.STEM .
Grass Lined Tank Infiltration Method of Analysis
Channel G0 Depression
SBUH
(:Pipe System"") Compensation/Mitigati
Energy Dissapator Flow Dispersal on of Eliminated Site
Open Channel Wetland Waiver Storage
Dry Pond Stream Regional
{vvetPond) Detention
Brief Description of System Operation Developed drainage collected in pipe
/catchbasin system and treated in detention/water quality
Facility Related Site Limitations
facilities on-site.
Reference Facility Limitation
Part 11 · STRUCTURAL ANALYSIS
(cast in Place Vault)
Retaining Wall
C§"ockery > 4' Higi0
Structural on Steep Slope
Other
Part12 EASEMENTS/TRACTS
rainage Easement
Native Growth Protection Easement
Other
. Part 13 SIG.NATURE OF PROFESSIONAL ENGINEEl'l
I or a civil engineer under my supervision my supervision have visited the site. Actual site
conditions as observed were incorporated into this worksheet and the atiachments. To the best of
my knowledge the information provided here is accurate.
?(z-1(0
Si ned/Date
169
NE 4TH ST
SITE
SE 128TH ST
w
V) w
~ V) w
V)
~ ~ iE iE
<(
<D
"' :r: a:, ,__
"' 0
<D
38TH 'o':<~~o
SE 139TH ST
SE 141ST ST
~'S'~ SE 142ND ST ,•
s'<-SE 143RD ST
~" SE 144TH ST
11/CINITY MAP
•
200 400 r4 .• , ~
SCALE IN F't£T
(""J t"l t"l I:, (""J ;;i
~~~~~~ -= I:, t"'l > "l [:;;
::i:,~t"lC'J~~ 8 t"' ~ t"l 3: 'O
t"'l 2 > ... 0
(""J "12'"1
--3 '@~~~
2 t"'l >< t"'l
0 t"'l "' t"'
• C"l:l~W "' f = ~
t"'l i:,:, I:,
(""J >< 0
::! = ~ 0>2
2 0"'
as N --3
"'l O [;;
0 r:: ~ ::,::, "'
(""J
0
J
U} --~~
\
\
r, 1
/
'
"··, .•... :
!!
11 1
,,.
I• \ 1 '
'· \ \ i ·1
I
I I ~., ( : .. ,, I
), j,I ' .. \ I'
\ -i:i \.-11, \;.f.1r
t,.il t·i: 'I,
iii \ -i h
\ ii\ \ --f,!j
\:)
\ ~I:
\ •'"! \.
\ ~(i
\1·{!
i=}.' ,, 'itll \~,-, ,/;
' 'II•
\~ :
i
w2
'..J c.:~:·'"i
' (.( .. r
w2,:
el
/'
,/"
,
i"'
j
··1 ,/ ,;'tJ,,"''"'"'''"
•.,.·C,'",)"-''''.,-',•:.,,_.., ·~"'"'~;Jt:~1~;;:-;,;;:z\~~:::_~'.\\ {k''' -!-~'
\ '. \. 'l It \ ·1·.,,. '. I'
U \
1 ~~~-·~ \JI\~ ,., ,... ·-r. \1 I \l -., 1J.., 1_ \___ '~ ·\
ri\r \, '1 1\: "·<:ii"
'.:::-~~· ~''f'i"''ll:::.:.":t~: '"' .. ,,,,., · n. .
. ' J.' \'' ! .i ~-./ !
·, ~ ' e '
j_ :, /' ;~' / 1. ·'I ~ I i' ,.-\·•·i l ; ~.
' I '
'----•• 1ii,
'· > \ ·n\•c
l --,\~ · \ ... 1r i /~· " 1
. I ,.,·\11.•... •. 1, ,,. '\ \ • { • . .. ·
I l . ; ·•-, ·,-I ! ,. " ',I \ .:.i\)· \ .. r.A •. ( -;_, ( \, 'I' ,/::•:· ' ~ °1,d(,\\q \f\J,,:·'
. ___ .. ____ --· .. ~>\_,.. · .J . I[:/_ "'~( ,. · \ .:(~:iI~l;
") \~. '. 1., ,)• V /\ \
t \1 :'.~ h.. '.., -. . 'i ., \ 1\
\ · ···, 11 , 1, \ t ·+-····--\ .5 \". .\ -.• ~-} f-
l '-.. ~ H ~ 'n1 l 1 \ r... • , f /'· i, • -... ; t_._,1_ "1.--.,'•-l"-';I<. '·\.,11 , ... , ... , 1,, ·-•'-, •••• J,· \ i
.1 r··1 ~ · · 1'-1·1,, ~. -'·.,, ."' ,~~~ ..... ~~ .• ( 1 ... r~ i .. , . . ·t,. i , .>···.. . J. ·1u i \ . ·. • l\ .. ··V1
.•• ,,,,__ , .. ~ \ I. \ \ ,/ '\
._, •, •• ,. .• ,.. : i .,~ ,I l, \I '1 /' ,' ~ '·. '• . I /· ' ./ ' I '•"j :. l .,t.·' : } I i
•. ::~,.. . ,,.., .. "'(~'c'<''··· ': '\t; . 1{,f:'?E:: : : .. ·._.·:·
1, e 2 ''-. I lit ; ~1(/()., ) f '; ·l ' ·..... ' b "\, , /i. '·:, ~f.-\..._ , i I .. ·-
'f'.:::·•;.;:.:::::.c:c:·:::::·::.c-::::::oc=:.::.·,,, \ l ·A
ljl' ,, ·;,;'),·~·"'·'<'.U,,it.i·'<:".t"' '-..V <..-t--' t. ll · i' •: ,..., .. 1.,-... "'·,.· -j . ., ..
,., [ I i i "'· '··~,, .• .._ .• , i f J''-,., .. '·,,, 11·-~ !I' ·, I .J., J ;'\,. \ 1 (,,...._ ...
;I .• ,., lf\ ..
".:,.,."" !' .
;; \ r'1 ;· .... , .... · ··.-.,:,
. 1··
r.,,,..
,·,,,_,~ .... ~,.-••<1'~''"'"""'"'' .. ,..,~I ~I\ [J w > <t•
i!:.
a,
"'' -
Cl
/") t,,
\ ..
-''') C. •"";; ,.-,., ... ),> ,. ,.;;:",,-..~¥•,,-..... C
)
l f.,,,•"r,,.,,,, ...
·:· .b
ft
\;.. H/ qf.
l!i..'I
;h ..
e5
'• ' I ,.
/'
' l:
' ' I,.
\ ' I' .,/''?~··~\: :
' "''<''~.::::~_]:(:~: .:. :J. ··,,
"""i ,,t,;··
"',.• ·····,., J __ , ..... q\· -... ·.
.• •?:'. .'.,.
.:ii.
,,
q
"i_
' ··~;
"<-r-.vir:
17
. ,~···~··· "\_
4 I
,r~.I
) ~ r';,;;'
'60TH AVE SEc'HA~IN
'1 ;~.:ne: i .. ·· .-'·:\.-?''.\:;', >-. ;: :f;.:;:;,:::~~/~-·· .. ~ , ,·.
,,.w ~ ' . ·. >,-,.,.
."(\. ·-~t
\I
•. ··· ... ~;
I• 1..i
.,
·,;_1
·,1
l
.,·1., i't
f ,.
fEVENDELL =~ .. ~
\.IF' · 7 ··~, . ·.,, ''«. -t
'ex~;~t'
./(9,3 AC>
:ll .
.}
C}
·lf.J
\· ..
156TH r···}· . ·. A\IE
' !
!'
i
•w7
"-".·, -,,
w8.
...
[~i-.. , .. .;:..,.-···
"··----~····-
··~. ""\.
'. 1 . \ I ., , I . ./
slrE rs, 1jr, bF / ;/1
•TRTllllTARY \t,Ri; A ·:. ~· ··'\. \ \ )tc.:J
., "-1 \ \•1 \
'•,\;·:+~·:.:\\ \,.,
SITE IS :5% OF
TRIBUTARY AREA' .. , .......
\,, ·<"'\,!
·':\ ··,, ., .•
i \~
I. ', i
:.-r.
·\>;·-
····---· ··,,, ·., .... ,?~~:\,···:
. ·:~:·,--.,·-~ ""~: ~ ..
·• .... ,
\
Haozous Engineering
CIVIL ENGIIEERING
1'4816 SE U6TH ST, RENTON, VA 980:59
'42S-235-2707 _ ..
DATO
&Ill 8/12/02 ........ DATO
E.JM 8/12/02
1,1'
. .... · '•. 'J;
'(.,,) .... _ ; 1( '.
c."t:-~t !~
4~g·~
ti ")'''''
.. .,., ... ,·~1,r,·~~~:.~\~">-:>(
-·:~.::.:.>::·:· .. ,,.,,_,.
.,.,...,.~ ..... .,
\
_/
.~&dlon
C.O of tK.15.
. ~povt-:Ser
A~.·
SITE IS 97. OF
TRIBUTARY AREA
PROJECT
NO.
EVENDELL PLAT
FlGUR·
Drainage Basins 2
£ sad,{1 .JaAoJ/asn puo1
3NOOU
"ON
lOJrO!ld
J..V1.d 113CTN3A3
ZO/tl/8 .. """' ffl'3 .....
ZO/Zl/8 nl'.l .... .. _
LOL2-sc2-g;.
6i;;.oe& ¥/\ 'Na.um • is H19n 1s 9t81't
!JNil:IDNIDN3 1IAI:I
~UJJ:00UJ1h:13 BilOZOlJH
133J NI 31VJS
lEzd 't -<-;,.*+
oo• ooa
··.;;
,
' •,
--; . .
..
•i
.. "' : ..
.. . . r. . : . : .
:
0
••
'
I slf' AGRICULTURE
KING COUNT:ON SERVICE
(RENT
• • " . " ' -:,
·I I
...... AaC . .
: . : i
:
--.....:.1.1 :·
.-
...
11 ...
...
.. ...
I
. .
: I . .: = m,
.... :;.:1.:.::·· ·. ,::····
I •• •
"'==:db;!~~
I I A,iC
I
I
.. . .. . . ··~ . . .... . ..
c..,,_II'-. ~ tr~ : : . : . . ..
I
I
. . . . . . ....... . .
. :
..
~./ Ml. TO U.S.10
I
• I
•••• I
• • • I
KING COUNTY
SOIL SURVEY
EVENDELL
CORE PROJECT NO. 04009
2. CONDITIONS AND REQUIREMENTS SUMMARY:
Listed below are the Hearing Examiner's Conditions. The postmaster approval is
included in Section 6 of this report. Attached at the end of this section is an email
between Kurt Wilson (developer) and Corey Thomas (City of Renton Fire) regarding the
emergency access cable and/or chain gate option, a copy of the SWM Adjustment
L02V0024, and a copy of the title report regarding drainage easement.
The preliminary plat revision ofEvendell, as received October 1, 2003, is APPROVED, subject
to the following conditions for final plat approval:
I. Compliance with all platting provisions of Title 19 of the King County Code.
To be address during final plat.
2. All persons having an ownership interest in the subject property shall sign on the face of
the final plat a dedication which includes the language set forth in King County Council
Motion No. 5952.
To be address during final plat.
3. a. The plat shall comply with the maximum density (and minimum density)
requirements of the R-4 zone classification. All lots shall meet the minimum
dimensional requirements of the R-6 zone classification or shall be as shown on the
face of the approved preliminary plat, whichever is larger, except that minor
revisions to the plat which do not result in substantial changes may be approved at
the discretion of the Department of Development and Environmental Services.
To be address during final plat.
b. The Applicant shall provide transfer of density credit documentation to DDES prior
to final approval to allow transfer of a maximum of 20 density credits to achieve a
maximum of 70 lots on the subject property.
To be address during final plat.
4. All construction and upgrading of public and private roads shall be done in accordance
with the King County Road Standards established and adopted by Ordinance No. 11187,
as amended (1993 KCRS), subject to any variances that may be approved by the King
County Road Engineer.
Construction of the roads comply with KCRS. See sheet Cl.02 and C3.31 of the civil plan set for
road sections and pavement design.
5. A Boundary Line Adjustment (BLA) shall be completed prior to final plat approval to
except from the plat that portion of the 200 (approximate) feet on the far west that is not
part of the proposed plat. Documentation demonstrating the resolution of boundary
issues with the property to the south (Nichols Place) also shall be provided to DDES.
To be address during final plat.
6. The Applicant must obtain the approval from the King County Fire Protection Engineer
for the adequacy of the fire hydrant, water main, and fire flow standards of Chapter
17 .08 of the King County Code.
Joint Use Development Tract Has shown on the plat will provide access to Lots 28 and
29. Additionally, it is a future emergency vehicle access tract to and from 160'h Avenue
SE, which the Applicant proposes to create in response to concerns raised by the City of
Renton. The Applicant shall include proposed protocols for the construction and
maintenance of Tract H, plus any related plat notes, with its engineering plans submittal,
meeting the following standards:
The emergency vehicle access to 160"' A venue SE shall have a minimum driving surface
width of 20 feet, with an all-weather surface capable of supporting 25 tons. Any locking
device shall be approved by the Renton Fire Department (KCFD # 25). Chains, cable or
bollards will not be permitted. The gate shall be located at least 50 feet from 160"'
Avenue SE to allow space for fire apparatus to stop while opening the gate or to wait
before entering the public roadway. If these conditions are not met any future residence
constructed on Lots 28 and 29 will have to be sprinklered NFPA 13D. These
requirements concerning adequate fire and emergency access may be modified in a
manner approved by the King County Fire Protection Engineer and King County Fire
District no. 25.
Approval of the fire hydrant placement is attached on the following page. See sheet CJ.02 of the
civil plan set for Tract H road section. The Renton Fire Department is okay with a cable or
chain within the emergency vehicle access per the attached email located at the end of this
section. Also the cable or chain can be located 50 'from the edge of the driving lane on J 6(/h or
61 'from the centerline of J 61Jh.
; , lO'!XJ.
I
Ntt7d 1:/3.1 lfM
17:JGN:IA:l NO.LN~lf
dO }..11:)
II
-c::::::{~)= ,§ ~ ~ 8
~ ~-
<(
@ ·=-=--n: I --· --~ ··~..:r,::-
U 0
(/)
=,I'H
I m=; J " _., . , -
0
°' 0
,! z ,~ ti
~ ~~ a:,
ll ili ~ s
i;, ls" I ;~.,
.,11:1:5 ..,
-"""' 31.., "' NOJS\,\3" "ON ----
8. Drainage adjustment L02V0024 is approved for this project. All conditions of approval
for this adjustment shall be met upon submittal of the engineering plans.
All conditions required for the adjustment have been addressed. See the end of this section for a
copy of the adjustment. See TI.R. for detention sizing which includes limiting release rates to
existing conditions plus the addition of a 10%factor of safety. See TJ.R.for calculation of water
quality volumes which includes the site improvements along with frontage improvements that are
captured by the proposed drainage system. The two drainage tracts will be dedicated to King
County during final plat. SEPA conditions have been addressed per Hearing Examiner's
Condition I 9.
9. A drainage easement for the conveyance from the Tract N drainage facility to 156th Ave
SE shall be provided upon engineering plan submittal.
The drainage easement is attached within the title report for the property. See the end of this
section for the title report.
I 0. The following road improvements are required to be constructed according to the 1993
King County Road Standards (KCRS):
a. The internal access road from SE 1361h Street to the beginning of the internal loop
road shall be improved to the urban subcollector standard, except that portion on the
west side between Lot 11 and Lot 12 is not required to be improved with a sidewalk.
See sheet CJ.02 of the civil plan set for the I 58'• Ave. SE and Portion of SE 137" St.
section and sheets C4.21 and C4.22for road centerline profiles.
b. The internal loop road shall be improved to the urban subaccess road standard with
sidewalks. on the outside frontage of the loop road.
See sheet CJ.02 of the civil plan set for the Portion of SE /371
' St., I 59'' Pl. SE, SE !38'h
St., I 58'' Pl. SE section and sheet C4.2 I for road centerline profile.
c. SE 136"' Street (frontage and offsite) shall be dedicated, designed and improved in
general conformance with the Preliminary Road Improvement Plan received
3/26/2002 with the Plat ofEvendell:
The frontage from 158th Ave NE to 160th Ave NE shall be improved to the urban
one-half street standard. Eighteen feet of additional right-of way shall be dedicated
for this improvement.
See sheet CJ.02 of the civil plan set for the SE /361
• St (Between I 58'• Ave. SE and 16(/'
Ave. SE) section and sheet C4.21 for road centerline profile.
SE 136th Street frontage from the west side of J.U.D.T. 'A' boundary to 158th Ave
NE shall be improved to the urban neighborhood collector standard; EXCEPT that
no sidewalk construction is required on the north side. Twenty feet of additional
right-of-way shall be dedicated for this improvement.
See sheet Cl.02 of the civil plan set for the SE 136'' St (Between 1561
• Ave. SE and 158'•
Ave. SE) section and sheet C4.21 for road centerline profile.
SE 136'" Street from 156th Ave SE to J.U.D.T. 'A' shall be improved to the urban
neighborhood collector standard; EXCEPT that no sidewalk construction is required
on the north side. Twenty-six feet of additional right-of-way shall be provided for
this improvement. An additional 25-foot right-of-way radius is required at the
southeast corner of 156th Ave SE and SE 136th Street. Striping for a second
westbound lane shall be provided within the 150-foot widened section approaching
156th Avenue SE, in a manner to be worked out at the time of submission of
engineering plans.
See sheet CJ.02 of the civil plan set for the SE 1361
• St (Between 156'' Ave. SE and 158''
Ave. SE) section and sheet C4.21 for road centerline profile. See sheet CJ.32 for
striping of SE 1361
• Street.
d. 160th Ave SE FRONT AGE: The 160th Ave SE frontage shall be improved with an 8-
foot paved shoulder on the west side. Adequate provisions for road drainage shall be
provided.
See sheets CJ.OJ and CJ.31 for shoulder construction information and pavement section.
Drainage will be conveyed either to the bypass ditch along 160'' or to the proposed
drainage system.
e. Tracts A,C,F,G,H, and I shall be improved to the joint use driyeway standard per
Section 3.01 of the KCRS. Tract A shall include an easement to King County for the
maintenance of the Tract N drainage facility. Tract A shall be owned and
maintained by the owners of Lots I and 2.
See sheet CJ.02 of the civil plan set for the Tracts A, C. F, H, & I section. Ownership
and maintenance of tracts will be dedicated during final plat.
f. Tracts B, D and E shall be improved to the private access tract standard per Section
2.09 of the KCRS.
See sheet Cl.02 of the civil plan set for the Tracts B, D, & E section and sheet C4.22for
road centerline profiles.
g. The Applicant shall revise the channelization that has been constructed in
conjunction with the plat of Highland Estates (LOOP0009). These modifications to
the channelization shall incorporate a revision of the current proposed painted
'island' to a southbound left turn lane with at least 60 feet of storage for left turning
vehicles to (a) encourage the use of 156th Avenue SE in lieu of 158th Avenue SE
and 160th Avenue SE, and (b) mitigate the potential deficient condition that would
result.from southbound left turning vehicles making left turns from the southbound
through lane, or using the painted island as a deceleration and refuge area while
waiting for gaps in northbound traffic.
Channelization and illumination plans must be submitted to King County Traffic
Engineering Section for review and approval of the turn lane channelization.
Modifications to the above road conditions may be considered according to the
variance provisions in Section 1.08 of the KCRS.
See sheet CJ.32 of the civil plan set for the revised channelization and modification of
the existing street lighting along 15 61
h Ave. SE.
11. There shall be no direct vehicular access to or from 160th Avenue SE from those lots
which abut this street. A note to this effect shall appear on the engineering plans and
final plat.
To be addressed duringfina/ plat. See sheet CJ.OJ on the civil plan set for a duplicate of the
above condition listed under "Hearing Examiner's Conditions".
12. All utilities within proposed rights-of-way must be included within a franchise approved
by the King County Council prior to final plat recording.
To be addressed during final plat.
13. The Applicant or subsequent owner shall comply with King County Code 14.75,
Mitigation Payment System (MPS), by paying the required MPS fee and administration
fee as determined by the applicable fee ordinance. The Applicant has the option to
either: (I) pay the MPS fee at final plat recording, or (2) pay the MPS fee at the time of
building permit issuance. If the first option is chosen, the fee paid shall be the fee in
effect at the time of plat application and a note shall be placed on the face of the plat that
reads, "All fees required by King County Code 14.75, Mitigation Payment System
(MPS), have been paid." If the second option is chosen, the fee paid shall be the amount
in effect as of the date of building permit application.
To be addressed during final plat.
14. The proposed subdivision shall comply with the Sensitive Areas Code as outlined in
KCC 21 A.24. Preliminary plat review has identified the following specific requirements
that apply to this project. All other applicable requirements from KCC 21 A.24 shall also
be addressed by the Applicant.
a. This site contains a Class 2 wetland. The majority of the wetland will be protected
from alteration during and after construction, with a 50-foot wide buffer around the
wetland boundary. An additional 15-foot building setback is required beyond the
edge of the buffer.
See sheets CJ.OJ and C4.01 of the civil plan set for delineation of 50' wetland buffer and
15' BSBL.
b. A maximum of 200 square feet of wetland will be filled for construction of SE 136th
Street. Mitigation shall consist of at least 400 square feet of wetland enhancement to
degraded portions of the existing wetland.
Wetland Mitigation plans are currently under review.
c. Road improvements for SE 136th Street and 160th Avenue SE will eliminate 6,989
square feet of wetland buffer. Mitigation shall consist of providing replacement
buffer in the northeast portion of the site at approximately a 2: I ratio to provide
additional protection for the wetland pursuant to KCC 21A.24.320B. Reduced
impact will result in reduced mitigation.
Wetland Mitigation plans are currently under review
d. The proposed sewer main within the SE 136th Street right-of-way will intrude into
the wetland buffer along with the road improvements. In order to protect wetland
hydrology: (I) the sewer line shall be installed during the dry season (June through
September), and (2) the design shall incorporate the use of pipe bed dams of
bentonite or other material at intervals to preclude draining possible subsurface
water flows through the gravel pipe bedding.
Design of the proposed sewer force main adjacent to the wetland along SE 13 6'' Street
has been designed with the required note and design of pipe bed dams adjacent to the
wetland buffer. See Sanitary Sewer Plan set that will be approved through the City of
Renton.
e. Downstream drainage improvements to existing culverts and stormwater
conveyances required through the SEP A MDNS shall cause no adverse alteration to
existing wetlands or streams in the vicinity of the drainage improvements.
Noted.
f. Critical Areas staff shall review engineering plans for the plat and sewer main for
conformance with these requirements.
Noted.
15. The following note shall be shown on the final engineering plan and recorded plat:
RESTRICTIONS FOR SENSITIVE AREA TRACTS AND SENSITIVE
AREAS AND BUFFERS
Dedication of a sensitive area tract/sensitive area and buffer conveys to the public a
beneficial interest in the land within the tract/sensitive area and buffer. This interest
includes the preservation of native vegetation for all purposes that benefit the public
health, safety and welfare, including control of surface water and erosion, maintenance
of slope stability, and protection of plant and animal habitat. The sensitive area
tract/sensitive area and buffer imposes upon all present and future owners and occupiers
of the land subject to the tract/sensitive area and buffer the obligation, enforceable on
behalf of the public by King County, to leave undisturbed all trees and other vegetation
within the tract/sensitive area and buffer. The vegetation within the tract/sensitive area
and buffer may not be cut, pruned, covered by fill, removed or damaged without
approval in writing from the King County Department of Development and
Environmental Services or its successor agency, unless otherwise provided by law.
The common boundary between the tract/sensitive area and buffer and the area of
development activity must be marked or otherwise flagged to the satisfaction of King
County prior to any clearing, grading, building construction or other development
activity on a lot subject to the sensitive area tract/sensitive area and buffer. The required
marking or flagging shall remain in place until all development proposal activities in the
vicinity of the sensitive area are completed.
No building foundations are allowed beyond the required 15-foot building setback line,
unless otherwise provided by law.
To be addressed during final plat. See sheet Cl.OJ on the civil plan set for a duplicate of the
above condition listed under "Hearing Examiner's Conditions".
16. Suitable recreation space shall be provided consistent with the requirements KCC
21A.14.180 and KCC 21A.14.!90 in providing sport court[s), children's play equipment,
picnic table[s], benches, etc.
a. A detailed recreation space plan (i.e., landscape specs, equipment specs, etc.) shall
be submitted for review and approval by ODES and King County Parks prior to or
concurrent with the submittal of the engineering plans. This plan shall comply with
Ordinance# 14045.
See sheets Cl.OJ and Cl.02 of the civil plan set for the Recreational Park Plan.
b. A performance bond for recreation space improvements shall be posted prior to
recording of the plat.
To be addressed during final plat.
17. A homeowners' association or other workable organization shall be established to the
satisfaction ofDDES which provides for the ownership and continued maintenance of
' the recreation, open space and/or sensitive area tract(s).
To be addressed during final plat.
18. Street trees shall be included in the design of all road improvements, and shall comply
with Section 5.03 of the KCRS and KCC ZlA.16.050:
a. Trees shall be planted at a rate of one tree for every 40 feet of frontage along all
roads. Spacing may be modified to accommodate sight distance requirements for
driveways and intersections.
See sheet C7.03 of the civil plan set for the Street Tree Planting Notes.
b. Trees shall be located within the street right-of-way and planted in accordance with
Drawing No. 5-009 of the 1993 King County Road Standards, unless King County
Department of Transportation determines that trees should not be located in the
street right-of-way.
See sheet C7.03 of the civil plan set for the Street Tree Planting Notes.
c. If King County determines that the required street trees should not be located within
the right-of-way, they shall be located no more than 20 feet from the street right-of-
way line.
See sheet C7.03 of the civil plan set for the Street Tree Planting Notes.
d. The trees shall be owned and maintained by the abutting lot owners or the
homeowners association or other workable organization unless the County has
adopted a maintenance program. Ownership and maintenance shall be noted on the
face of the final recorded plat.
See sheet C7. 03 of the civil plan set for the Street Tree Planting Notes. Ownership and
maintenance shall be addressed during final plat.
e. The species of trees shall be approved by DDES if located within the right-of-way,
and shall not include poplar, cottonwood, soft maples, gum, any fruit-bearing trees,
or any other tree or shrub whose roots are likely to obstruct sanitary or storm sewers,
or that is not compatible with overhead utility lines.
See sheet Cl. 03 of the civil plan set for the Street Tree Planting Notes.
f. The Applicant shall submit a street tree plan and bond quantity sheet for review and
approval by DDES prior to engineering plan approval.
See sheet C7.03 of the civil plan set for the Street Tree Planting Plan along with tree
count quantities.
g. The street trees must be installed and inspected, or a performance bond posted prior
to recording of the plat. If a performance bond is posted, the street trees must be
installed and inspected within one year of recording of the plat. At the time of
inspection, if the trees are found to be installed per the approved plan, a maintenance
bond must be submitted or the performance bond replaced with a maintenance bond,
and held for one year. After one year, the maintenance bond may be released after
DDES has completed a second inspection and determined that the trees have been
kept healthy and thriving.
A landscape inspection fee shall also be submitted prior to plat recording. The
inspection fee is subject to change based on current County fees.
To be addressed during final plat.
19. The following have been established by SEP A as necessary requirements to mitigate the
adverse environmental impacts of this development. The Applicants shall demonstrate
compliance with these items prior to final approval.
a. East Drainage Basin:
The 160th Ave SE downstream conveyance system shall be upgraded to provide for
the I 00-year storm capacity. Downstream driveway culverts/ditches and a cross-
culvert under 160th Avenue SE shall be improved as follows: Culverts P-117 and P-
116 on the west side of 160th Avenue SE, cross-culvert P-115, and culverts P-114 and
P-113 on the east side of 160th Avenue SE shall be improved as needed. The culvert
designations are according to the Level 3 Downstream Drainage Analysis by
Haozous Engineering dated August 26, 2002. To address a related localized
flooding condition, bank and channel stabilization are also required in the unopened
right-of-way for 162"d Avenue SE, in the vicinity of the easterly line of Lot 12, Rich
Lea Crest (address 16046 SE 142"d Street). It is estimated that stabilizing and re-
grading approximately 50 to I 00 feet of channel, east of 16046 SE 142"' Street, will
be adequate to resolve flooding that has occurred in the past location. The culverts
and channel described are located from the south site boundary to a distance of
approximately I, 700 feet downstream.
Level 2 Flow Control design is required for the proposed stormwater detention
facility. A factor of safety of 5 to 15 percent, determined by the design engineer,
shall be required for detention storage volumes.
Level 2 Flow Control was utilized for sizing of the East Basin wetpond. A 10%factor of
safety was added per the minimum required as a condition of the Drainage adjustment
L02V0024. Culverts Pl 15, Pl 14, and Pl 13 have already been replaced by others. Pl 15
is now a 24" N-12 and Pll4 and Pl 13 are both 30" N-12. Culvert Pll6 and Pll7 will
be replaced as part of this development.
b. West Drainage Basin:
The stormwater detention facilities shall be designed to the Level 3 Flow Control
Standard as described in the 1998 King County Surface Water Design Manual
(KCSWDM). As an option, Level 2 Flow Control with downstream improvements
can be proposed according to Core Requirement 2 of the KCSWDM. The minimum
Flow Control Standard shall be Level 2. A factor of safety of 5 to 15 percent,
determined by the design engineer, shall be required for detention storage volumes.
The downstream impacts of the 1,700 feet of conveyance improvements shall be
reviewed by the developer's engineer, and any recommendations necessary to
prevent flooding or other damage from occurring as a consequence of the required
conveyance improvements shall be included with the plans for review by DOES.
Level 3 Flow Control was utilized for sizing of the West Basin wetvault. A 10%
factor of safety was added per the minimum required as a condition of the
Drainage adjustment L02V0024.
School Mitigation Fees
20. Lots within this subdivision east of 158th Avenue SE are subject to King County Code
21A.43, which imposes impact fees to fund school system improvements needed to serve
new development. As a condition of final approval, fifty percent ( 50%) of the impact
fees due for the plat shall be assessed and collected immediately prior to recording, using
the fee schedules in effect when the plat receives final approval. The balance of the
assessed fee shall be allocated evenly to the dwelling units in the plat and shall be
collected prior to building permit issuance.
To be addressed during final plat.
School Walkways
21. A pedestrian access easement between 158'h Place SE and 160th Avenue SE shall be
provided over either Tract Hor L (as shown in Exhibit 62). The easement shall have a
minimum I 0-foot width and be improved with a 5-foot wide paved surface.
A pedestrian access easement will be provided through Tract L & H See sheet Cl.OJ for
location.
22. The Applicant, individually or in conjunction with other developers, shall construct an
off-site walkway to Liberty High school from the site. The walkway shall be constructed
within the right-of-way from 160th Ave SE, east along SE 135th Street to 166th Ave SE,
and south to Liberty High School at SE 136th Street, or via alternative right-of-way and
easements that become available and are approved by DOES. One acceptable alternative
would be to use future right-of-way of Southeast 136th Street and 162nd Avenue
Southeast to connect with the sidewalk improvement of "five lot subdivision," and
through the plat of"five lot subdivision"/LOOP0023 to the southwest gate of Liberty
High School. The walkway shall be designed and constructed in accordance with the
1993 King County Road Standards and shown on the engineering plans for DOES review
and approval.
Any surfacing alternative from the King County Road Standards (KCRS 3.09) may be
submitted for approval through a road variance application.
Off-site walkway is currently being constructed by others.
,,
®
King County
Department of Development
and Environmental Services
900 Oakesdale Avenue SW
Renton, WA 98055-1219
October 17, 2002
Mike Romano
Centurion Development Services
22617 Eighth Drive SE
Bothell, WA 98021
Edward J, McCarthy, P.E.
Haozous Engineering, P.S.
14816 SE 1161h Street
Renton, WA 98059
RE: Evendell Subdivision SWM Adjustment Request (File No. L02V0024)
Dear Applicant and Engineer:
The Land Use Services Division, Engineering Review Section, has completed review of the
adjustment request for the Evendell subdivision. You are requesting approval for an
adjustment from the 1998 King County Surface Water Design Manual (KCSWDM) Core
Requirement No. 1, Section 1.2.1, Discharge at the Natural Location. Our review of the
information and a site visit provides the following findings:
1. The prorosed Evendell subdivision is located west of 1601h Avenue SE and south of
SE 1361 Street. The 7 5 lot, 11. 7 acre, proposed E~dell subdivision is filed under
Land Use Services Division (LUSD) file number l1P0016.
2. The Evendell subdivision is located in the Orting Hills subbasin of the Lower Cedar
River basin. The site is subject to the Level Two flow control and Basic water quality
requirements of the 1998 KCSWDM.
3. The site consists of two adjoining, rectangular areas south of SE 1361h Street split by
1581h Avenue SE. The smaller, western rectangle is 1.9 acres in size, while the larger,
eastern rectangle is 9 .8 acres. A common ridgeline passes approximately north-
northwest to south-southeast through the two areas with the majority of the site
draining to the east. The western subbasin sheetflows in a southwest direction through
large, single family f arcels and is eventually intercepted by a ditch drainage system on
the east side of 1561 A venue SE and flows south. The eastern subbasin sheetflows to
the southeast and is eventually intercepted by a ditch system on the west side of 160th
A venue SE and flows south. Both downstream drainage paths eventually recombine
in an unclassified tributary of the Lower Cedar River. Most upstream flow is
intercepted by ditches on the north side of SE 136th Street and is bypassed around the
project site or through the wetland area in the northeast comer of the site.
'il • •
",
0
~
l :
0
• ,
; •
~
:j. • 0
N g
N ;;,
"' ~
0
i ..,.
0
' "i .
0 ..
E
~
'
C
~
" i
~
a • • ,.._
a;:
\_
\
\
1
\ M~t 'devwest'-i-_ 'deveast'
\ I \ ·~~~t ~ L / _...,,\~'---=~~--------==-·__jj, --==-~ .,L./
I
<O ..;----
93ll' 623
JO'W X'loo'L X 7.5'9 (INSIOE ~
10P OF VNJLT• -482.&
WA1IR SURFACE• -481.0 ear. DET.• 475.0
REQ'O OET. VOL~ 18,000 CF r· DET. VOL• 20.200 CF (6.73'0)
:;r t,lfflW w.tJtB m war YNttf
10'W X JO'L X &.5'0 (lNS1llE DIM.)
· lOP OF VNJlT• 48U
WATER SURfACE= 482.0
N88d!4 3811 !306 DET. VOL• 1,500 CF
. ~ ear. DET.• •n.o
---=-·-· S?}}j!J.ea4t _ _J._36th SMe~ ~CF~: --~ ==---::,.... --. • • . . -~. • • _3 ·_-. -,:.
I
WEF!AND &
B~
79\ AC
\\
""'\
Y"".\ \-
o~ " ~
I]
0.58 />C DIVERiED L_ FROM EAST TO WEST I I __ __,,-~ --:'<l,l>?I ,seS-~.
56 / 75 j 1/i 73
__J L I I I :______=:---I
J I I
I
L_l_l_j
~
0.73 J DIVERTED
FROM WEST TO EAST
lot 7
Rose
'
I
I .v -,c--.--/-/; J_,,_ __ _
57 y--t-/--1-"' 72
-~-. ..J / ( --1----
I /.>9~7 I · 58 _ I · _ 71
---L-ISlTE. l'~-/-----,z. ·.a.e-r ---
! 61/60 j 69 j) .68
~-: . I / \------_" :J' ,:-t-i-_r
63 I 64 j 65 ~ 66 .
----· ----~=-~
u
~ \ -
~,-=::::
I .
,-+
I
i ~<O
::a
j I~%
IL -~j
::i ! « IL
wD ~ ~z
0 z <lit C,
:z 1i IP.i ~ i ai=;O
Id " ~
1,;
~ ~ 'r;,· e;o o» ~· • = ,. ~ ~ ..... -.., ti§~ ~ S-
Q) ~i:!18 ~ .s ;!;5~~ ~151;.(r---F--lj
r-1 :18~ l ; ";.; ~Ii
0 ~ .... 0 N
c,j ;,;
ti:: -
~
lj! l'l,fS
&
§.,.
0
2
' ........ '-~ \._./
Evendell/L02V0024
October 17, 2002
Page 2 of3
4. The proposal is to collect most runoff from the project site and direct it to two
facilities designed to separately accommodate drainage from the western and eastern
areas of the site. The result is that 0.58 acres of the eastern subbasin will be diverted
to the flow control vault and bioswale of the western rectangle of the site; and 0.73
acres of the western subbasin will be diverted to the combined wetpond/detention
pond serving the eastern rectangle of the site. In the developed condition, the net
effect is that 0.15 acres of the western subbasin will become tributary to the eastern
subbasin's downstream drainage system. As a result, controlled outflows from the
western area will be released farther upstream in the ditch system of 1561h Avenue SE
reducing nuisance sheetflow through the intervening parcels. The release location
from the eastern subbas.in will remain the same. A negligible shift in flows in the two
downstream drainage paths will result. The current conceptual drainage plan indicates
that a significant amount of frontage improvement drainage will bypass the planned
RID facilities.
5. No decorative ponds or shallow wells have been identified that would be affected by
the proposed diversion.
6. The Level One and Three Downstream Drainage Analyses identified conveyance
restrictions and nuisance flooding problems associated with both of the proposed
downstream discharge locations. Although this adjustment is not addressing the
potential for increased flow control standards as a result of the downstream drainage
problems, the net impact of the proposed diversion will have a negligible impact on
either downstream drainage path.
Based on these findings, we hereby approve this adjustment to allow the diversion of on-site
runoff between the two drainage subbasins to two separate facilities ultimately draining to
their natural discharge locations with the following conditions:
1. The release rates for the detention facilities will be based on the natural and diverted
tributary areas being directed to the facilities.
2. The volume for the detention facility will be basect'on all flows directed to the
facilities at full development under current zoning. The allowed release rates will be
reduced by any tindetained flows that would bypass the proposed subdivision drainage
facilities. A IO to 20 percent volumetric factor of safety must be applied to all storm
events requiring detention. The design Technical Information Report shall state the
factor of safety selected and the basis of that determination.
3 .. Water quality facilities must be sized based on the entire proposed subdivision
draining to the facilities including any required frontage improvements.
4. All onsite or offsite drainage facilities must be located in a public right-of-way or
storm drainage tract dedicated to King County.
Evendell/L02V0024
October 17, 2002
Page 3 of3
5. Additional storm drainage requirements identified by SEPA or the plat hearing review
wiJl apply to this project. ·
If you have any further questions regarding this KCSWDM adjustment or the design
requirements, please contact Mark Bergam at (206) 296-7270.
Sincerely,
James Sanders, P.E.
Development Engineer
Engineering Review Section
Land Use Services Division
· Jim Chan, P.E.
Supervising Engineer
Site Engineering and Planning Section
Building Services Division
cc: Curt Crawford, P.E., Managing Engineer, Stormwater Services, KCDNR
Randall Parsons, P.E., Senior Engineer, Engineering Review Section, LUSD
Bruce Whittaker, Senior Engineer, Engineering Review Section, LUSD
Karen Scharer, Planner II, Current Planning Section, LUSD
Mark Bergam, P .E., Senior Engineer, Engineering Review Section, LUSD
King County
Department of Development
And Environmental Services
900 Oakesdale A veuue SW
Renton, WA 98055-1219
Project Name:
Evendell Plat
Project Address:
Portions of Sections 25 36 ofT23N R5E
Appricant:
Mr. Mike Romano
Address:
Centurion Development Services
22617 8th Drive SE ·
Bothell WA 98021
Phone:
' ( 425) 486-2563"
Date:
-*c:hz_
DOES File No.
LOIP0016
DOES Engineer/Planned Name:
Bruce Whittaker P.E.
Design Engineer (submitting variance):
Edward J. McCarth P.E.
Signature:
tJwar-d D· f(/cCart~
Engineering Firm Name:
Haozous Engineering, P.S.
Address:
14816 S.E. I 16th Street
Renton, WA 98059
Phone:
425 235:2707
Date: 2/25/02
DESCRIPTION OF THE VARIANCE REQUEST: !_Standard Request
We request that the design of the storm water facility that manages storm water from
developed portions ofEvendell be allowed to divert drainage from a net area of0.15 acre
from the west basin to the east basin on the site.
APPLICABLE SECTION($) OF STANDARDS:
The adjustment request is applicable to Core Requirement# 1: Discharge at the Natural
Location, Section 1.2.1 of the Surface Water Design Manual (King County Department
of Natural Resources, 1998).
1'-J4 JUSTIFICATION (see ORO-page attachment):
AUTHORIZED SIGNATURES:
DDES Dlreetor/Deslgnee Determination:
_ Approval
CDNDITIDNS OF APPROVAL:
I'. See attached memo dated: lb/vt{o,-..
_Denial
Date: i,o/11-/ fr'?--,
ODES, Land Use Services DMsion, Engineering Review Supervisor: ODES, Bldg. Serv. Div., Site Engineering & Planning Supervisor:
Date: Signed:
MAR2}!0;@
K.C. D.D.E.S.
King Comly
Depllrtment of Development
And Envirorunental Services
900 Oakesdale Avenue SW
Renton, WA 98055·1219
Even dell -Diversion of Drainage -Adjustment Request
JUSTIFICATION:
Description of Site
The Evendell Plat project is a proposed residential development located within the Renton
Highlands area of unincorporated King County. The proposal for development includes
building 75 single-family dwellings on approximately 12 acres. Road improvements along
SE 1361h Street are also proposed.
The site is located within the Orting Hills subbasin of the Cedar River watershed (King
County Department ofNatural Resources, 1999). The site and area of offsite
improvements consist of two basins. The east basin consists of 9. 84 acres under existing
conditions. The topography of the east basin generally slopes from the northwest to the
southeast. The west basin consists of 1. 92 acres under existing conditions. The topography
of the west basin generally slopes from the east to the west. The southwest comer of the
site has an area of 0. 73 acre that is included in the westerly subbasin. Runoff from this
subbasin sheet flows to adjacent yards of single-family residences to the southwest.
Stormwater Design
Under developed conditions, stormwater from the site and off site road improvements will
be collected and treated onsite to basic water quality standards. A combined
wetpond/detention pond will be used to manage runoff in the easterly basin. A vault
followed by a biofiltration swale will be used to manage runoff in the westerly basin.
Level 2 RID standards are required by the King County Flow Application Maps and are
recommended by Lower Cedar River Basin and Nonpoint Action Plan.
Under developed conditions, the 0.73-acre area in the southwest comer of the site will be
diverted from the westerly basin and collected in the onsi_te stormwater system in the.
easterly basin. To compensate for this diversion of drainage, an area of0.58 acre in the
northwest portion of the site will be diverted from the east basin to the west. The net
result will be a diversion of 0.15 acre from the west basin to the east basin.
Managing runoff with the proposed diversions results in the following features:
0 Two stormwater facilities will be constructed. A larger combined
wetpond/detention pond will manage runoff in the easterly basin and will
discharge to the ditch system along 1601h Avenue SE. Avault will be used
'
to manage runoff from the smaller westerly basin and will discharge to the
ditch system along 1561h Avenue SE.
• The discharge locations from each basin will be to an engineered
conveyance system.
• The net diversion of0.15 acre is not anticipated to cause any problems in
either of the two basins.
References
King County Department of Parks, Planning, and Resources, 1990. Sensitive Areas Map
Folio.
King County Environmental Division, 1990. Wetlands Inventory Notebook Volume 2
East.
King County Department ofNatural Resources, 1998. Surface Water Design Manual.
King County Surface Water Management Division, 1993a. Cedar River Current and
Future Conditions Report.
1
CORE -Dave Cayton
oin:
..,ent: ·
To:
Subject:
Kurt Wilson [kurt@soundbuilthomes.com]
Thursday, April 29, 2004 2:48 PM
CORE -Dave Cayton
FW: Evendell Fire Access Requirement (Tract H)
FYI-please work this out with KC fire for approval. Lets propose the cable or chain for now.
Kurt Wilson
SBI Developing, LLC
Office: (253) 539-8116
Fax: (253) 539-0514
cell: (253) 377-7147
cc;<;·;;:
,,.,,,,_..,.~"··,·,-:
c~c--Original Message-----
c/iriJ.'fi( Corey W Thomas [mailto:CThomas@ci.renton.wa.us]
~fi\(Thursday, April 29, 2004 11 :38 AM
To: Kurt Wilson
Subject: Re: Evendell Fire Access Requirement (Tract H)
'ie Renton Fire Department will accept chain or cable type gating
~ystems as Jong as the posts supporting them are fully clear of the
20,feet width when the chain or cable is unlocked. We will not accept
bollards. The distance of 50-feet may be measured from the drive lane
rather than the right of way.
'~,:•I.
>>> "Kurt Wilson" <kurt@soundbuilthomes.com> 04/28/2004 11 :55:27 >>>
Perc.ondition # 6 we are required to provide a Jocking device which can
n"ofbt, 'a cable or chain, per our discussion you would allow this so long
. I . . .
a~;)V,fllid not propose bollards. Can you affirm this in a response back
t~1.ttrn?·'.".Also, is there any possibility in locating the cable 50ft from
v .. ,.", ' ( tbe!tlriviilg lane on 160th rather than 50ft from the ROW? It would
~~~ilyhelp our access to the lot closest to 160th.:
6. The Applicant must obtain the approval from the
King County Fire Protection Engineer for the adequacy of the fire
hydrant, water main, and fire flow standards of Chapter 17.08 of the
I<.in'g County Code. <?xml:namespace prefix = o ns =
"uril:schemas-microsoft-com:office:office" />
c\irti Use Development Tract H as shown on the plat will provide access
_,;!.,~.ts 28 and 29. Additionally, it is a future emergency vehicle
a'c{~~s tract to and from 160th Avenue SE, which the Applicant propose::s
t~cr,1~tfin response to concerns raised by the City of Renton. The
~pplic:'ant shall include proposed protocols for the construction and
t~C·t~;·:~ · 1
~ ..
.maintenance.of Tract H, plus any related plat notes, with its
: engineering plans submittal, meeting the following standards:
. The emergency vehicle access to 160th Avenue SE shall have a minimum
driving surface width of20 feet, with an all-weather surface capable of
,supporting 25 tons. Any locking device shall be approved by the Renton
;Wfe Department (KCFD # 25). Chains, cable or bollards will not be
i,i?~tin,i)ted. The gate shall be located at least 50_ feet fro?1160th Avenue
S.Eto allow space for fire apparatus to stop while opemng the gate or
1.t,{0Jit'before entering the public roadway. If these conditions are not
',ri{~laAy future residence constructed on Lots 28 and 29 will have to be
sprinklered NFP A 13D. These requirements concerning adequate fire and
emergency access may be modified in a manner approved by the King County
Fire Protection Engineer and King County Fire District no. 25.
Thanks for your consideration>
,J(ifrt Wilson
· ~~I D.eveloping
3~539-8116 office
23:,!5~9-0514 fax
is:f1'h-7147 cell . ,, . ._.
' . . This message has been scanned by the City ofRenton's filtering gateway.
2
CHICAGO TITLE INSURANCE COMPANY
701 FIFfH AVENUE, #3400, SEATTLE, WA 98104
A.L.T.A. COMMITMENT
SCHEDULE A
Title Unit: U-06
Phone: (206)628-5610
Fax: (206)628-9717
THIRD COMMITMENT
Order No.: 1077234
Officer: SA VIDIS/W AGNER/CAMPBELL/MINOR Your No.: US LAND/SB! DEVELOPING
Commitment Effective Date: MAY 5, 2004
1 . Polley or Policies to be Issued:
at 8:00A.M.
ALTA Owner's Policy
1992 EXTENDED
SUBDIVIDER SALE -EXTENDED RATE
Amount:
Premium:
Tax:
$3,124,000.00
$4,158.00
$ 365.90
Proposed Insured:
SB I DEVELOP I NG, L. LC. , A WASHINGTON LIM I TEO LI AB IL ITV COMPANY
Policy or Policies to be issued:
ALT A Loan Policy
Proposed Insured:
Policy or Policies to be issued:
ALT A Loan Policy
Proposed Insured:
Amount: $0.00
Premium:
Tax:
Amount: $0. 00
Premium:
Tax:
2 . The estate or Interest in the land which Is covered by this Commitment is:
FEE SIMPLE
3. Title to the estate or interest in the land is at the effective date hereof vested in:
DAVID A. NYBLOM AND DEBRA L. ALBISO, HUSBAND ANO WIFE, AS TD PARCEL A; AND
ROBERT A. MAIR ANO CLYOERAE MAIR, HUSBAND AND WIFE, AS TO PARCEL B
4. The land referred to In this Commitment is described as follows:
SEE ATTACHED LEGAL DESCRIPTION EXHIBIT
WLTACOMA/RDA/0999
PARCEL A:
CHICAGO TITLE INSURANCE COMPANY
A.LT.A. COMMITMENT
SCHEDULE A
(Continued)
Order No.: 1077234 ·
Your No.: US LAND/SB I DEVELOPING
LEGAL DESCRIPTION EXHIBIT
(Paragraph 4 of Schedule A continuation)
THE EAST HALF OF THE NORTHWEST QUARTER OF THE SOUTHEAST QUARTER OF SECTION
14, TOWNSHIP 23 NORTH. RANGE 5 EAST, WILLAMETTE MERIDIAN, IN KING COUNTY,
WASHINGTON;
EXCEPT THAT PORTION OF SAID EAST HALF OF THE NORTHWEST QUARTER OF THE
SOUTHEAST QUARTER OF SAID SECTION 14 DESCRIBED AS FOLLOWS:
BEGINNING AT THE SOUTHEAST CORNER OF SAID EAST HALF OF THE NORTHWEST QUARTER
OF THE SOUTHEAST QUARTER AS THE POINT OF TRUE BEGINNING;
THENCE NORTH 00'25'21" EAST 523.99 FEET ALONG THE EAST LINE OF SAID EAST HALF
OF THE NORTHWEST QUARTER OF THE SOUTHEAST QUARTER;
THENCE NORTH 88'07'58" WEST 653.61 FEET TO THE WEST LINE OF SAID EAST HALF OF
THE NORTHWEST QUARTER OF THE SOUTHEAST QUARTER;
THENCE SOUTH 0'27'05" WEST 525.82 FEET TO THE SOUTH LINE OF SAID EAST HALF OF
THE NORTHWEST QUARTER OF THE SOUTHEAST QUARTER;
THENCE SOUTH 88'17'35" EAST 653.84 FEET ALONG THE SOUTH LINE OF SAID EAST
HALF OF THE NORTHWEST QUARTER OF THE SOUTHEAST QUARTER TO THE TRUE POINT OF
BEGINNING; AND
EXCEPT COUNTY ROADS.
PARCEL B:
THE NORTH HALF OF THE NORTH HALF OF THE NORTHWEST QUARTER OF THE NORTHWEST
QUARTER OF THE SOUTHEAST QUARTER OF SECTION 14, TOWNSHIP 23 NORTH, RANGE 5
EAST, WILLAMETTE MERIDIAN, IN KING COUNTY, WASHINGTON;
EXCEPT THE WEST 30 FEET CONVEYED TO KING COUNTY FOR ROAD PURPOSES BY DEED
RECORDED UNDER RECORDING NUMBER 1094243.
TOGETHER WITH A NON-EXCLUSIVE EASEMENT FOR INGRESS, EGRESS AND UTILITIES
OVER, UNDER AND ACROSS THE NORTH 15 FEET OF THE WEST 187 FEET (AS MEASURED
FROM THE EASTERLY MARGIN OF COUNTY ROAD RIGHT OF WAY) OF LOT 2 OF SHORT PLAT
NO. 878133 1 RECORDED UNDER RECORDING NUMBER 8002250639, IN KING COUNTY,
W/\SHINGTON;
~\Y'I~ ~~m'T 'Fo"(( c.on\/l::.YIDrnlf. ~
~T n 1)t.f\-\nAf:it. "Fl4UUT'Y.
CLTACMA&/RDA/0999
)
CHICAGO TITLE INSURANCE COMPANY
A.LT.A. COMMITMENT
SCHEDULEB Order No.: 1077234
Your No.: US LAND/SB I DEVELOPING
Schedule B of the policy or policies to be issued will contain exceptions to the following matters
unless the same are disposed ofto the satisfaction of the Company.
GENERAL EXCEPTIONS
A. Rights or claims of parties in possession not shown by the public records.
B. Encroachments, overlaps, boundary line disputes, or other matters which would be disclosed by an
accurate survey and inspection of the premises.
C. Easements, or claims of easements, not shown by the public records.
D. Any lien, or right to a lien, for contributions to employee benefit funds, or for state workers'
compensation, or for services, labor, or material heretofore or hereafter furnished, all as
imposed by law, and not shown by the public records.
E. Taxes or special assessments which are not shown as existing liens by the public records.
F. Any service, installation, connection, maintenance, tap, capacity or construction charges for sewer, water,
electricity, other utilities, or garbage collection and disposal.
G. Reservations or exceptions in patents or in Acts authorizing the issuance thereof;
Indian tribal codes or regulations, Indian treaty or aboriginal rights, including easements or equitable servitudes.
H. Water rights, claims, or title to water.
I. Defects, liens, encumbrances, adverse claims or other matters, if any, created, first appearing In the
public records, or attaching subsequent to the effective date hereof but prior to the date the
proposed Insured acquires of record for value the estate or interest or mortgage thereon covered by
this Commitment.
SPECIAL EXCEPTIONS FOLLOW
WLTACOMB/RDA/0999
CHICAGO TITLE INSURANCE COMP ANY
A.L.T.A. COMMITMENT
SCHEDULEB
(Continued)
Order No.: 001077234
Your No.:
SPECIAL EXCEPTIONS
A 1. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
GRANTEE:
PURPOSE:
AREA AFFECTED:
RECORDED:
RECORDING NUMBER:
KING COUNTY WATER DISTRICT NUMBER
90, A MUNICIPAL CORPORATION
WATER AND SEWER MAINS WITH
NECESSARY APPURTENANCES
NORTHERLY 30 FEET OF PARCEL B
JULY 17, 1975
7507170570
B 2. EASEMENT AND THE TERMS AND CONDITIONS THEREOF:
GRANTEE:
PURPOSE:
AREA AFFECTED:
RECORDED:
RECORDING NUMBER:
PUGET SOUND POWER & LIGHT COMPANY,
A WASHINGTON CORPORATION
ELECTRIC TRANSMISSION AND/OR
DISTRIBUTION LINES
A RIGHT OF WAY 10 FEET IN WIDTH
HAVING 5 FEET OF SUCH WIDTH ON EACH
SIDE OF A CENTERLINE DESCRIBED AS
FOLLOWS:
THE CENTERLINE OF GRANTEE'S
FACILITIES AS CONSTRUCTED OR TO BE
CONSTRUCTED, EXTENDED OR RELOCATED,
LYING WITHIN PARCEL A
FEBRUARY 23, 1995
9502230476
C 3. PAYMENT OF THE REAL ESTATE EXCISE TAX, IF REQUIRED.
THE PROPERTY DESCRIBED HEREIN IS SITUATED WITHIN THE BOUNDARIES OF
LOCAL TAXING AUTHORITY OF UNINCORPORATED KING COUNTY. PRESENT RATE IS
1.78%.
ANY CONVEYANCE DOCUMENT MUST BE ACCOMPANIED BY THE OFFICIAL
WASHINGTON STATE EXCISE TAX AFFIDAVIT. THE APPLICABLE EXCISE TAX
MUST BE PAID AND THE AFFIDAVIT APPROVED AT THE TIME OF THE RECORDING
OF THE CONVEYANCE DOCUMENTS.
D 4. GENERAL AND SPECIAL TAXES AND CHARGES, PAYABLE FEBRUARY 15,
DELINQUENT IF FIRST HALF UNPAID ON MAY 1, SECOND HALF DELINQUENT IF
CLTACMBJ/RDA/0999
CHICAGO TITLE INSURANCE COMPANY
A.LT.A. COMMITMENT
SCHEDULEB
(Continued)
Order No.: 1077234
Your No.: US LAND/SB I DEVELOPING
SPECIAL EXCEPTIONS
UNPAID ON NOVEMBER 1 OF THE TAX YEAR (AMOUNTS DO NOT INCLUDE INTEREST
AND PENAL Tl ES) :
YEAR:
TAX ACCOUNT NUMBER:
LEVY CODE:
ASSESSED VALUE-LAND:
ASSESSED VALUE-IMPROVEMENTS:
GENERAL & SPECIAL TAXES:
AFFECTS: PARCEL A
2004
142305-9009-04
6870
$ 257,000.00
$ 336,000.00
BILLED:
PAID:
UNPAID:
$ 7,280.03
$ 3,640.02
$ 3,640.01
E 5. GENERAL AND SPECIAL TAXES AND CHARGES, PAYABLE FEBRUARY 15, DELINQUENT
IF FIRST HALF UNPAID ON MAY 1, SECOND HALF DELINQUENT IF UNPAID ON
NOVEMBER 1 OF THE TAX YEAR (AMOUNTS DO NOT INCLUDE INTEREST AND
PENALTIES):
YEAR:
TAX ACCOUNT NUMBER:
LEVY CODE:
ASSESSED VALUE-LAND:
ASSESSED VALUE-IMPROVEMENTS:
GENERAL & SPECIAL TAXES:
AFFECTS: PARCEL B
2004
142305-9022-07
4350
$ 95,000.00
$110,000.00
BILLED:
PAID:
UNPAID:
$ 2,635.06
$1,317.53
$1,317.53
F 6. DEED OF TRUST AND THE TERMS AND CONDITIONS THEREOF:
GRANTOR:
TRUSTEE:
BENEFICIARY:.
AMOUNT:
DAVID A. NYBLOM AND DEBRA L. ALBISO,
HUSBAND AND WIFE
NORTHWEST FINANCIAL CORPORATION, A
WASHINGTON CORPORATION
FIRST SAVINGS BANK OF WASHINGTON
$ 203,150.00
CLTACMB2/RDA/099t
CHICAGO TITLE INSURANCE COMP ANY
A.L.T.A. COMMITMENT
DATED:
RECORDED:
RECORDING NUMBER:
LOAN NUMBER:
SCHEDULEB
( Continued)
Order No.: 1077234
Your No.: US LAND/SB I DEVELOPING
SPECIAL EXCEPTIONS
JULY 21, 1995
AUGUST 1, 1995
9508010201
7 744958 17
THE AMOUNT NOW SECURED BY SAID DEED OF TRUST AND THE TERMS UPON WHICH
THE SAME CAN BE DISCHARGED OR ASSUMED SHOULD BE ASCERTAINED FROM THE
HOLDER OF THE INDEBTEDNESS SECURED.
H AFFECTS: PARCEL A
7. DEED OF TRUST AND THE TERMS AND CONDITIONS THEREOF:
GRANTOR:
TRUSTEE:
BENEFICIARY:
AMOUNT:
DATED:
RECORDED:
RECORDING NUMBER:
LOAN NUMBER:
ROBERT A. MAIR AND CLYDERAE MAIR,
HUSBAND AND WIFE
FIDELITY MORTGAGE TRUSTEE SERVICE, A
CALIFORNIA CORPORATION
IMC MORTGAGE COMPANY DBA COREWEST
MORTGAGE COMPANY
$122,000.00
JULY 18, 1997
JULY 31, 1997
9707311685
3WA-11028
THE AMOUNT NOW SECURED BY SAID DEED OF TRUST AND THE TERMS UPON WHICH
THE SAME CAN BE DISCHARGED OR ASSUMED SHOULD BE ASCERTAINED FROM THE
HOLDER OF THE INDEBTEDNESS SECURED.
J AFFECTS: PARCEL B
L 8. DEED OF TRUST AND THE TERMS AND CONDITIONS THEREOF:
GRANTOR:
TRUSTEE:
BENEFICIARY:
AMOUNT:
DAVID A. NYBLOM AND DEBRA L. ALBISO,
HUSBAND AND WIFE
CHICAGO TITLE INSURANCE COMPANY
KING COUNTY CREDIT UNION
$ 98,000.00
CL T ACMBZ/RDA/0999
CHICAGO TITLE INSURANCE COMPANY
A.L.T.A. COMMITMENT
SCHEDULEB
(Continued)
Order No.: 1077234 Your No.: US LAND/SB I DEVELOPING
DATED:
RECORDED:
RECORDING NUMBER:
LOAN NUMBER:
SPECIAL EXCEPTIONS
SEPTEMBER 17, 2001
SEPTEMBER 24, 2001
20010924002679
NOT DISCLOSED
THE AMOUNT NOW SECURED BY SAID DEED OF TRUST AND THE TERMS UPON WHICH
THE SAME CAN BE DISCHARGED OR ASSUMED SHOULD BE ASCERTAINED FROM THE
HOLDER OF THE INDEBTEDNESS SECURED.
AFFECTS: PARCEL A
Z 9. MATTERS DISCLOSED BY SURVEY RECORDED UNDER RECORDING NUMBER
9508099008, AS FOLLOWS:
A. BARN APPURTENANT TO PARCEL A ENCROACHES UP TO 1.0 FEET INTO
SOUTHERLY ADJOINER;
B. FENCES NEAR WESTERLY AND SOUTHERLY PROPERTY BOUNDARIES OF PARCEL A
DO NOT CONFORM WITH PROPERTY LINES.
N 10. A PORTION OF THE IMPROVEMENTS LOCATED ON THE HEREIN DESCRIBED PROPERTY
WAS PREVIOUSLY A MOBILE HOME WHICH HAS BEEN CONVERTED TO REAL PROPERTY
BY MANUFACTURED HOME TITLE ELIMINATION CERTIFICATE RECORDED UNDER
RECORDING NUMBER 20010919001892.
D AFFECTS: PARCEL B
P 11. RIGHT, TITLE AND INTEREST OF U.S. LAND DEVELOPMENT ASSOCIATES, A
WASHINGTON GENERAL PARTNERSHIP, PRESUMED BY THE APPLICATION FOR TITLE
INSURANCE TO HAVE AN INTEREST IN SAID PREMISES.
Q NOTE: SAID INTEREST, IF ANY, IS SUBJECT TO THE FOLLOWING MATTERS
SHOWN AT PARAGRAPHS 12 AND 13.
R 12. TERMS AND CONDITIONS OF THE PARTNERSHIP AGREEMENT FOR U.S. LAND
DEVELOPMENT ASSOCIATES.
S NOTE: A COPY OF THE PARTNERSHIP AGREEMENT, AND AMENDMENTS THERETO, IF
ANY, MUST BE SUBMITTED.
CLTACMBZ/RDA/0999
CHICAGO TITLE INSURANCE COMPANY
A.LT.A. COMMITMENT
SCHEDULEB
(Continued)
Order No.: 1077234
Your No.: US LAND/SB I DEVELOPING
SPECIAL EXCEPTIONS
T 13. ANY CONVEYANCE OR MORTGAGE BY U.S. LAND DEVELOPMENT ASSOCIATES, MUST
BE EXECUTED IN ACCORDANCE WITH THE PARTNERSHIP AGREEMENT AND BY ALL
THE GENERAL PARTNERS AND THEIR RESPECTIVE SPOUSES AS OF THE DATE OF
ACQUISITION, OR EVIDENCE MUST BE SUBMITTED THAT CERTAIN DESIGNATED
PARTNERS HAVE BEEN AUTHORIZED TO ACT FOR THE PARTNERSHIP.
AK 14. PHYS I CAL INSPECTION MADE MARCH 4, 2003 VERIFIED THE REQUIREMENT FOR A
SURVEY DUE TO LACK OF ACCESS TO SITE AND OVERALL SIZE OF PROPERTY.
V 15. PRIOR TO ISSUING AN EXTENDED FORM OWNER'S POLICY THIS COMPANY REQUIRES
THAT THE PARTIES TO THE TRANSACTION PROVIDE AN ALTA/ASCM CERTIFIED,
AS-BUILT SURVEY.
AD 16. THE LEGAL DESCRIPTION IN THIS COMMITMENT IS BASED ON INFORMATION
PROVIDED WITH THE APPLICATION AND THE PUBLIC RECORDS AS DEFINED IN THE
POLICY TO ISSUE. THE PARTIES TO THE FORTHCOMING TRANSACTION MUST
NOTIFY THE TITLE INSURANCE COMPANY PRIOR TO CLOSING IF THE DESCRIPTION
DOES NOT CONFORM TO THEIR EXPECTATIONS.
AF 17. IT IS OUR UNDERSTANDING THAT THE INTENDED TRANSACTION INVOLVES THE
SUBDIVISION OF PARCEL B BY MEANS OF A LOT LINE ADJUSTMENT. UPON THE
SUBMISSION AND REVIEW OF THE FINAL LEGAL DESCRIPTION OF THE PROPERTY
TO BE CONVEYED, THIS COMMITMENT WILL BE REVISED ACCORDINGLY.
AE THE PREMIUM FOR THE FORTHCOMING OWNER'S POLICY IS COMPUTED AS FOLLOWS:
STANDARD COVERAGE -
EXTENDED SURCHARGE -
INSPECTION FEE -
AL NOTE 1:
$ 2,138.00 PLUS TAX OF$ 188.14
$1,870.00 PLUS TAX OF$ 164.56
$ 150.00 PLUS TAX OF$ 13.20
IN THE EVENT THE OWNER'S POLICY COVERAGE IS CHANGED FROM EXTENDED TO
STANDARD COVERAGE A CHARGE OF $150.00, PLUS $13.20 SALES TAX, WILL BE
ADDED TO COVER THE COSTS RELATING TO THE EXTENDED COVERAGE INSPECTION.
AA NOTE 2:
EFFECTIVE JANUARY 1, 1997, DOCUMENT FORMAT AND CONTENT REQUIREMENTS
HAVE BEEN IMPOSED BY WASHINGTON LAW. FAILURE TO COMPLY WITH THE
FOLLOWING REQUIREMENTS MAY RESULT IN REJECTION OF THE DOCUMENT BY THE
CLTACMB2/RDA/0999
)
CHICAGO TITLE INSURANCE COMP ANY
A.LT.A. COMMITMENT
SCHEDULEB
(Continued)
Order No.: 1077234
Your No.: US LAND/SB I DEVELOPING
SPECIAL EXCEPTIONS
COUNTY RECORDER OR IMPOSITION OF A $50.00 SURCHARGE.
FIRST PAGE OR COVER SHEET REQUIREMENTS:
3" TOP MARGIN CONTAINING NOTHING EXCEPT THE RETURN ADDRESS.
1" SIDE AND BOTTOM MARGINS CONTAINING NO MARKINGS OR SEALS.
TITLE($) OF DOCUMENTS.
RECORDING NO. OF ANY ASSIGNED, RELEASED OR REFERENCED DOCUMENT(S).
GRANTORS NAMES (AND PAGE NO. WHERE ADDITIONAL NAMES CAN BE FOUND).
GRANTEES NAMES (AND PAGE NO. WHERE ADDITIONAL NAMES CAN BE FOUND).
ABBREVIATED LEGAL DESCRIPTION (AND PAGE NO. FOR FULL DESCRIPTION).
ASSESSOR'S TAX PARCEL NUMBER(S).
RETURN ADDRESS (IN TOP 3" MARGIN).
**A COVER SHEET CAN BE ATTACHED CONTAINING THE ABOVE FORMAT AND DATA
IF THE FIRST PAGE DOES NOT CONTAIN ALL REQUIRED DATA.
ADDITIONAL PAGES:
1" TOP, SIDE AND BOTTOM MARGINS CONTAINING NO MARKINGS OR SEALS.
ALL PAGES:
NO STAPLED OR TAPED ATTACHMENTS. EACH ATTACHMENT MUST BE A SEPARATE
PAGE.
ALL NOTARY AND OTHER PRESSURE SEALS MUST BE SMUDGED FOR VISIBILITY.
FONT SIZE OF B POINTS OR LARGER.
ALL INFORMATION MUST BE LEGIBLE AND CAPABLE OF BEING IMAGED.
THE FOLLOWING MAY BE USED AS AN ABBREVIATED LEGAL DESCRIPTION ON THE
DOCUMENTS TO BE RECORDED TO COMPLY WITH THE REQUIREMENTS OF RCW 65.04.
SAID ABBREVIATED LEGAL DESCRIPTION IS NOT A SUBSTITUTE FOR A COMPLETE
LEGAL DESCRIPTION WHICH MUST ALSO APPEAR IN THE BODY OF THE DOCUMENT:
POR OF NW 1/4 OF SE 1/4 OF SEC 14, TWP 23 N, RGE 5 E, W.M.
END OF SCHEDULE B
CLTACMBZ1RDA/09!l9
CHICAGO TITLE INSURANCE COMPANY
A.LT.A. COMMITMENT
SCHEDULEB
(Continued)
Order No.: 1077234
Your No.: US LJ\ND/SBI DEVELOPING
SPECIAL EXCEPTIONS
AC THE FOLLOWING PARTIES HAVE BEEN SENT A COPY OF THIS COMMITMENT:
CTI/SCOTT SMOUSE
SCOTT SMOUSE
HOWARD STANSBURY
MICHAEL UTT
SBI DEVELOPING, L.L.C.
1/1
KURT WILSON 1 /1
CLTACMBZ/RDA/0999
3. OFFSITE ANALYSIS:
A Level I and Level 3 Offsite Drainage Analyze were completed by Haozous
Engineering during preliminary engineering. A copy of the report is attached in Section 6
of this report.
Upstream Tributary Area
Drainage from the area north of SE 1361h Street, that would otherwise enter the property,
is cut off by an existing ditch that runs along the north side of SE 136 1h Street. Proposed
development will either preserved the existing ditch or a rockery and/or perforated pipe
will be installed behind the rockery or the proposed back of curb to direct the upstream
drainage into the existing ditch or downstream to 1561h Avenue SE conveyance system.
The existing ditch that runs along the north side of SE 1361h Street naturally drains to an
existing ditch that runs south along the west side of l 60'h Avenue SE. Proposed
improvements to SE 136 1h Street will include the installation of a culvert that crosses
under SE 1361h Street and directs the upstream drainage to a proposed ditch that will be
located approximately 8' west of the existing ditch that runs along 1601h Avenue NE due
to proposed shoulder construction along l 60'h Avenue SE. This upstream drainage will
bypass proposed detention/water quality facilities.
The East Basin receives approximately 0.36 acres of upstream drainage from forested
land. See Existing and Developed Conditions Exhibit in Section 4 of this report. This
area will be routed through the proposed East Basin wetpond.
Downstream Analysis
A Level 1 and Level 3 Offsite Drainage Analyze were completed by Haozous
Engineering during preliminary engineering. A copy of the report is attached in Section 6
of this report.
7. Final plat approval shall require full compliance with the drainage provisions set forth in
King County Code 9.04. Compliance may result in reducing the number and/or location
of lots as shown on the preliminary approved plat. Preliminary review has identified the
following conditions of approval which represent portions of the drainage requirements.
All other applicable requirements in KCC 9.04 and the Surface Water Design Manual
(SWDM) must also be satisfied during engineering and final review.
a. Drainage plans and analysis shall comply with the 1998 King County Surface Water
Design Manual and applicable updates adopted by King County. DDES approval of
the drainage and roadway plans is required prior to any construction.
Drainage facilities and analysis comply with the 1998 KCSWDM. See sheets C4.0l,
C4.21, C4.22, C4.31, C4.32, C4.33 o the civil plan set for storm drainage design and
T.J.R. for storm drainage analysis.
b. Current standard plan notes and ESC notes, as established by DDES Engineering
Review, shall be shown on the engineering plans.
Plan notes are no sheets CUJ2, C2.0l, CJ.31, and C4.33 of the civil plan set.
c. The following note shall be shown on the final recorded plat:
"All building downspouts, footing drains, and drains from all impervious surfaces
such as patios and driveways shall be connected to the permanent storm drain outlet
as shown on the approved construction drawings# on file with DDES
and/or the King County Department of Transportation. This plan shall be submitted
with the application of any building permit. All connections of the drains must be
constructed and approved prior to the final building inspection approval. For those
lots that are designated for individual lot infiltration systems, the systems shall be
constructed at the time of the building permit and shall comply with plans on file."
To be address during final plat.
d. The stormwater detention design shall comply with the Level 2 or Level 3 Flow
Control requirements, as applicable, per the 1998 King County Surface Water
Design Manual (KCSWDM). (See SEPA conditions in condition no. 19.)
The West Basin drainage facility was sized using Level 3 Flow Control. The East Basin
drainage facility was sized using Level 2 Flow Control. See T.I.R. for detention analysis.
e. The storm water control facility shall be located in a separate tract and dedicated to
King County unless portions of the drainage tract are used for required recreation
space in accordance with KCC 2\A.14.180.
The wetvault for the West Basin is located in a separate tract labeled "Tract N". The
wetpondfor the East Basin is located in a separate tract labeled "Tract M". These
tracts will be dedicated to King County during final plat.
)
4. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND
DESIGN:
A. Hydraulic Analysis
The drainage analysis was modeled using the King County Runoff Time Series software.
The onsite soils are Alderwood (AgC), KCRTS group Till per the Soils Map attached on
the following pages. The site is located in the Sea-Tac rainfall region with a location
scale factor of 1.0.
EXISTING CONDITIONS
TRADING OF EXISTING IMPERVIOUS PAVEMENT FOR PROPOSED
IMPERVIOUS AREA BYPASSING DETENTION/WATER QUALITY FACILITIES
Areas ofroad improvements along SE 1361h Street and shoulder addition along 1601h
Avenue SE will be bypassing the proposed storm drainage facilities. As a trade off,
existing asphalt areas equal to or more than the bypass areas will be collected and treated
within the proposed storm drainage facilities. The existing asphalt areas will be
considered pasture in the existing condition and impervious in the proposed condition.
Since these existing impervious surfaces were not treated and/or detained for in the past,
the total runoff from the bypass areas plus the outflows from the detention/water quality
facilities will be the same or less than the outflows as they exist today. See Existing and
Developed Conditions Exhibit on the following pages for delineation of the existing
impervious areas to be collected and proposed pavement areas to be bypassed.
WEST BASIN
The basin boundary delineated for the West Basin includes the development and SE 1361h
Street west of the existing basin ridge. A portion of the most western portion of SE 1361h
Street will not be included in the existing condition, i.e. not captured in the proposed
drainage system, since an equal amount of existing asphalt will be included within the
developed West Basin and treated as pasture in the existing condition. For the reasons
stated above, detention does not need to account for the bypass area since existing asphalt
will be treated in the place of the bypass impervious surfaces.
The western portion of the site is 1.81 acres. The existing coverage is a combination of
impervious surfaces associated with the existing outbuildings, pasture, landscaping, lawn,
and forest. The existing landscaping and lawn will be considered pasture per Table
3.2.2.C in the 1998 KCSWDM for existing developed areas with densities less than 4
DU/ AC. The site is covered with 1.57 acres of pasture and 0.20 acre of forest. Existing
impervious surfaces from the existing outbuildings cover a total area of0.04 acre. Per
Table 3.2.2.E in the 1998 KCSWDM, the effective impervious fraction for the site is 0.40
for existing rural areas. The effective impervious area is therefore 0.40*0.04 acre = 0.02
acre. Pasture will be utilized for the non-effective impervious surfaces (0.04 acre -0.02
acre= 0.02 acre). The following information was used for generating time series and
flow frequencies.
WEST BASIN Total Area= 1.81 acres
EXISTING CONDITIONS
(exwest)
GROUND COVER AREA(acre)
Till-Forest 0.20
Till-Pasture (1.57 + 0.02) 1.59
Imoervious 0.02
. ,• -· . .. .. .
..... J.
••
••
..
,'
I s:if AGRICULTURE
t
KING COUNT?N SERVICE
II ' ... • ' : ,
..• -. A,JC . . . . . : .. :
:
_ ...... -.:J ,·
. . . . -
(RENT
.-
Eve
' II
" " .. ~ . "· •\\.
\\",.
, ..
•sc
.·· . ,
•" I • • •
.. .. . .. ..... . . . . . . . . :.
.....
. :
..
: ":; ...
: : :" . ··,·.;.,\/(.~~~
• • "••" . I
II
1: ~:f
" II• • i( ABC
• .... 1
• • II
I " II " " " . " ._:._ ____ _
II .. ~,~"'='i5f1'ri
'-=:i.,,-:-'11, .. .. ,:
KING COUNTY
~OIL SURVEY
EVENDELL
! CORE PROJECT NO. 04009 ·
)
--->;,>
3.2.2 KCRTS/RUNOFFFILES METHOD-GENERATING TIME SERIES
SCS Soil Type scs KCRTS Soil Notes
Hydrologlc Group
Soil Group -Alderwood (AgB, Age, AgD) e I Till J
Arents, Alderwood Material (AmB, Ame) e Till
Arents, Everett Material (An) B Outwash 1
Beausite (Bee, BeD, BeF) e Till 2
Bellingham (Bh) D Till 3
Brisco! (Br) D Till 3
Buckley (Bu) D Till 4
Earlmont (Ea) D Till 3
Edgewick (Ed) e Till 3
Everett (EvB, Eve, EvD, Ewe) NB Outwash 1
Indianola (lne, lnA, lnD) A Outwash 1
Kitsap (KoB, Kpe, KpD) e Till
Klaus /Kse) e Outwash 1
Naillon (Nee) A Outwash 1
Newberg (Ng) B Till 3
Nooksack (Nk) e Till 3
Norma (No) D Till 3
Orcas (Or) D Wetland
Oridia (Os) D Till 3
Ovall (Ove, OvD, OvF) e Till 2
Pilchuck (Pc) e Till 3
Puget (Pu) D Till 3
Puyallup (Py) B Till 3
Ragnar (Rae, RaD, Rae, RaE) B Outwash 1
Renton (Re) D Till 3
Salal (Sa) e Till 3
Sammamish (Sh) D Till 3
Seattle (Sk) D Wetland
Shalcar (Sm) D Till 3
Si (Sn) e Till 3
Snohomish (So, Sr) D Till 3
Sultan (Su) C Till 3
Tukwila (Tu) D Till 3
Woodinville (Wo) D Till 3
Notes:
1. Where outwash soils are saturated or underlain at shallow depth {<5 feet) by glacial till, they should
be treated as till soils.
2. These are bedrock soils, but calibration of HSPF by King County DNR shows bedrock soils to have
similar hydrologic response to till soils.
3. These are alluvial soils, some of which are underlain by glacial till or have a seasonally high water
table. In the absence of detailed study, these soils should be treated as till soils.
4. Buckley soils are formed on the low-permeability Osceola mudflow. Hydrologic response is
assumed to be similar to that of till soils.
1998 Surface Water Design Manual 9/1/98
3-25
ST 1.1
ST 1.0
Rainfall Regions and
Regional Scale Factors
vn Incorporated Area
-...= River/Lake
Major Road
LA 0.9 LA 1.2
EAST BASIN
The basin boundary delineated for the East Basin includes the development, SE 1361h
Street east of the existing basin ridge, and a portion of 1601h Avenue SE. A portion of the
shoulder additional along 1601h Avenue SE will not be included in the existing condition,
i.e. not captured in the proposed drainage system, since an equal amount of existing
asphalt will be included within the existing/developed East Basin and treated as pasture in
the existing condition. For the reasons stated above, detention does not need to account
for the bypass area since existing asphalt will be treated in the place of the bypass
impervious surfaces.
The eastern portion of the site is I 0.06 acres. The existing coverage is a combination of
impervious surfaces associated with the existing residence, pasture, landscaping, lawn,
and forest. The existing landscaping and lawn will be considered pasture per Table
3.2.2.C in the 1998 KCSWDM for existing developed areas with densities less than 4
DU/AC. The site is covered with 3.00 acres of pasture and 6.62 acres of forest. Existing
impervious surfaces from the existing residence and outbuildings cover a total area of
0.44 acre. Per Table 3.2.2.E in the 1998 KCSWDM, the effective impervious fraction for
the site is 0.40 for existing rural areas. The effective impervious area is therefore
0.40*0.44 acre= 0.18 acre. Pasture will be utilized for the non-effective impervious
surfaces (0.44 acre -0.18 acre= 0.26 acre). The following information was used for
generating time series and flow frequencies.
EAST BASIN Total Area= 10.06 acres
~:XISTING CONDITIONS
(ex east)
GROUND COVER AREA/acre)
Till-Forest 6.62
Till-Pasture (3.00 + 0.26) 3.26
Imnervious 0.18
TRIBUTARY AREA CONDITIONS
EAST BASIN
The East Basin receives 0.36 acre of upstream drainage from forest area just west of the
site. The following information was used for generating time series and flow frequencies.
EAST UPSTREAM Total Area= 0.36 acre
TRIBUTARY CONDITIONS
(uosteast)
GROUND COVER AREA(acre)
Till-Forest 0.36
Flow Frequency Analysis
Time Series File:exwest.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak --Peaks Rank Return Prob
(CFS) (CFS) Period
0.128 2 2/09/01 18:00 0 .216 1 100.00 0.990
0.049 7 1/05/02 16:00 0.128 2 25.00 0. 960
0 .116 3 2/28/03 3:00 0.116 3 10.00 0.900
0.014 8 3/24/04 19:00 0.109 4 5.00 0.800
0.066 6 1/05/05 8:00 0.105 5 3.00 0.667
0.109 4 1/18/06 16:00 0.066 6 2.00 0.500
0.105 5 11/24/06 4:00 0. 049 7 1. 30 0.231
0.216 1 1/09/08 6:00 0. 014 8 1.10 0.091
Computed Peaks 0.187 50.00 0.980
Flow Frequency Analysis
Time Series File:preeast.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak --Peaks Rank Return Prob
(CFS) (CFS) Period
0.698 2 2/09/01 18:00 0.999 1 100.00 0.990
0.238 7 1/05/02 16:00 0.698 2 25.00 0. 960
0.580 3 2/28/03 3:00 0.580 3 10.00 0.900
0.060 8 8/26/04 2:00 0.559 4 5.00 0.800
0.339 6 1/05/05 8:00 0.516 5 3.00 0.667
0.559 4 1/18/06 20:00 0.339 6 2.00 0.500
0.516 5 11/24/06 4:00 0.238 7 1. 30 0.231
0.999 1 1/09/08 9:00 0.060 8 1.10 0.091
Computed Peaks 0.899 SO.OD 0.980
Flow Frequency Analysis
Time Series File:posteast.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
1. 94 6 2/09/01 2:00
1.59 8 1/05/02 16:00
2.32 3 2/27/03 7:00
1. 73 7 8/26/04 2:00
2.08 4 10/28/04 16:00
2.06 5 1/18/06 16:00
2.52 2 10/26/06 0:00
3.90 l 1/09/08 6:00
Computed Peaks
-----Flow Frequency Analysis-------
--Peaks Rank Return Prob
(CFS) Period
3.90 l 100.00 0.990
2.52 2 25.00 0. 960
2.32 3 10.00 0.900
2.08 4 5.00 0.800
2.06 5 3.00 0.667
1. 94 6 2.00 0.500
1. 73 7 1. 30 0.231
1. 59 8 1.10 0. 091
3.44 50.00 0.980
Flow Frequency Analysis
Time Series File:exeast.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak --Peaks Rank Return Prob
(CFS) (CFS) Period
0.675 2 2/09/01 18:00 0.970 1 100.00 0.990
0.232 7 1/05/02 16:00 0.675 2 25.00 0.960
0.564 3 2/28/03 3:00 0.564 3 10.00 0.900
0.060 8 8/26/04 2:00 0.541 4 5.00 0.800
0. 329 6 1/05/05 8:00 0.501 5 3.00 0.667
0.541 4 1/18/06 20:00 0. 329 6 2.00 0.500
0.501 5 11/24/06 4:00 0.232 7 1. 30 0.231
0.970 1 1/09/08 9:00 0.060 8 1.10 0.091
Computed Peaks 0. 872 50.00 0.980
Flow Frequency Analysis
Time Series File:upsteast.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
0.023 2 2/09/01 18:00
0.006 7 1/06/02 4:00
0.017 4 2/28/03 3:00
0.001 8 3/24/04 20:00
0.010 6 1/05/05 8:00
0.018 3 1/18/06 20:00
0.015 5 ll/24/06 6:00
0.029 1 1/09/08 9:00
Computed Peaks
-----Flow Frequency Analysis-------
--Peaks Rank Return Prob
(CFS) Period
0.029 1 100.00 0.990
0.023 2 25.00 0. 960
0.018 3 10.00 0.900
0.017 4 5.00 0.800
0.015 5 3.00 0.667
0.010 6 2.00 0.500
0.006 7 1. 30 0. 231
0.001 8 1.10 0.091
0.027 50.00 0.980
DEVELOPED CONDITIONS
The developed basin ridge delineated and allowed per SWM Adjustment L02V0024 was
regraded at a different location than what currently exists. See Existing and Developed
Conditions Exhibit on the following pages. The relocation was logical based on the
property boundary and basin ridge relationship. A small triangle of area adjacent to the
existing basin ridge within the existing West Basin is currently located at the most
southwestern end of the property. This triangle of area is approximately 300' from the
West Basin located within the property boundary, therefore this small area will be
conveyed to the East Basin in the developed condition and an equal amount of area within
the existing East Basin located along adjacent to the basin ridge at the north end of the
site will be conveyed to the West Basin. Since an adjustment was required to relocate the
basin ridge, an automatic 10% safety factor was added to the detention calculations.
The maximum impervious area per lot was calculated using the criteria in the 1998 ](jng
County Surface Water Design Manual page 3-27 and K.C.C.2 lA.12.030. The proposed
development is urban residential. The site is R-6 zoning. The maximum impervious area
per lot is 70%.
WEST BASIN
The lots within the West Basin cover a total area of 1.15 acres.
Maximum Lot Impervious Area= 70%*1.15 acres= 0.81 acre
West Basin Impervious Area Delineation
Onsite road and sidewalk 0.49 acres
Impervious area oflots 0.81 acres
Total impervious area 1.30 acres
The input used for the KCRTS analysis is summarized in the table below:
WEST BASIN To ta! Area = I. 81 acres
DEVELOPED CONDITIONS
(devwest)
GROUND COVER AREA(acre)
Till-Grass (Landscapine:) 0.51
Impervious 1.30
21A.12.030 A. Densities and dimensions -residential zones . --~-:.
RESIDENTIAL
z RURAL 0 URBAN URBAN
N RESERVE R!S10EN11AI.
E
s
' STANDARDS RA·2.5 .... RA-10 RA-20 UR •. , .... ~ ... R-12 .. ,. R-24 .....
1171
Base Denstty: D..2 D..2 u o.os D..2 , • • • 12 18 .. .. -----dWK ·------du/ac -Unl1/ .... (21) ti)
(1S)
Maximum Density: 0A 0A • 9 12 11 27 ,. 72
Dwelflng Unlt/Acr9 ------"""' ..... ·-(1) (20) (20) (22)
IUnlmum Detwly: --.... '"' "'" -...,,
(2) (12) (12) (12) MIi) (18) M•l (18)
118) (111) (18)
(23)
Minimum Lot 1:1,n 135ft ,,.. '135ft 35ft 35ft ,Oft ,Oft ,Oft ,Oft ... 30ft "'ft
Wldlh (7) (7)
(>) .
Minimum street ,Oft ,Oft ,.. 30ft 30ft 20ft 10ft 10ft 10ft 10ft 10ft 10ft 10ft -(1) (9) (9) (9) (7) (7) (8) (8) (II) (8) (8) (II) (I)
(>)
lllnlmum-Sft 10ft 10 ft 10 ft 5ft .ft 5ft •• 8ft Sft 5ft .. 5ft ....... (9) (9) (9) (9) (7) (7) (10) (10) (10) (10)
(3) (18}
BaNHoight .. ft .. ft ... <Oft 35ft 35ft "'ft 35ft 35ft 6Gft 80ft ... 80ft
(4) 48ft 45ft 80ft 80ft 80ft
(1Al (1-1) {14) 11•1 (1-1)
/ -..,m '\ .... "" "" 12.5% '°" ""' "" 70% "" "" "" "" -I
lmpervlous (11) {11) (11) M1) (11) (11) .__./
Surtace: (19) (18) (19) (19)
' Pffl:entage (S) I
12-2 (King County 6-00)
Flow Frequency Analysis
Time Series File:devwest.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak --Peaks Rank Return Prob
(CFS) (CFS) Period
0.361 6 2/09/01 2:00 0. 722 1 100.00 0.990
0.301 8 1/05/02 16:00 0.485 2 25.00 0. 960
0.432 3 2/27/03 7:00 0.432 3 10.00 0.900
0.333 7 8/26/04 2:00 0.399 4 5.00 0.800
0.399 4 10/28/04 16:00 0.384 5 3.00 0.667
0.384 5 1/18/06 16:00 0.361 6 2.00 0.500
0.485 2 10/26/06 0:00 0.333 7 1. 30 0.231
0.722 1 1/09/08 6:00 0.301 8 1.10 0.091
Computed Peaks 0.643 50.00 0.980
EAST BASIN
The lots within the East Basin cover a total area of 6.62 acres.
Maximum Lot Impervious Area= 70%*6.62 acres = 4.63 acres
East Basin Imnervious Area Delineation
Onsite road and sidewalk 2.06 acres
Imoervious area of lots 4.63 acres
Total impervious area 6.69 acres
The input used for the KCRTS analysis is summarized in the table below:
EAST BASIN Total Area= I 0.06 acres
DEVELOPED CONDITIONS
(deveast)
GROUND COVER AREA(acre)
Till-Grass (Landscaoing) 3.37
lmoervious 6.69
Flow Frequency Analysis
Time Series File:deveast.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak -Peaks Rank Return Prob
(CFS) (CFS) Period
1. 92 6 2/09/01 2:00 3. 88 1 100.00 0.990
1. 58 8 1/05/02 16:00 2.52 2 25.00 0.960
2.31 3 2/27/03 7:00 2.31 3 10.00 0.900
1. 73 7 8/26/04 2:00 2.08 4 5.00 0.800
2.08 4 10/28/04 16:00 2.05 5 3.00 0.667
2.05 5 1/18/06 16:00 1. 92 6 2.00 0.500
2.52 2 10/26/06 0:00 1.73 7 1. 30 0.231
3.88 1 1/09/08 6:00 1.58 8 1.10 0. 091
Computed Peaks 3.42 50.00 0.980
B. Detention Routing Calculatious
Per the Hearing Examiner's Conditions, the West Basin wetvault will mitigate for
increased drainage flows from the developed West Basin utilizing Level 3 Flow Control.
The East Basin wetpond will mitigate for increased drainage flows from the developed
East Basin utilizing Level 2 Flow Control. All storn1water mitigation facilities will be
designed according to the 1998 KCSWDM. Since an adjustment was required to relocate
the basin ridge, an automatic 10% safety factor was added to the detention calculations.
WEST BASIN
The West Basin will utilize a wetvault to accommodate the required Level 3 Flow
Control. The West Basin wetvault (wvault.rdf) was sized based on the 1998 KCSWDM
and KCRTS Computer Software Reference Manual. See attached KCRTS printouts.
The wetvault per KCRTS will have a surface area of2,967 square feet and a depth of7.42
feet. To accommodate the required 10% safety factor, the vault will be constructed with a
surface area of3,264 square feet (34 feet by 96 feet).
West Basin Wetvault Overflow Elevation
The primary overflow for the vault is the riser pipe within the control structure. The
water surface elevation above the riser for the 100 year developed flow is calculated
assuming all orifices are plugged. To pass the 100-year return period storm, 0. 72 cfs,
through a 12" overflow riser will require 0.47 feet of head (From Figure 5.3.4.H in the
1998 KCSWDM: Qweir = 9.739DH 312 => 0.72 = 9.739(12/12)H 312 => H = 0.18 feet).
The primary overflow elevation would therefore, be equal to the elevation of the top of
the riser plus the amount of head required to pass the I 00-year return period storm, Elev.
478.47 + 0.18 feet= Elev. 478.65. The ceiling of the vault is located at elevation 459.0
and will accommodate the required overflow elevation.
Retention/Detention Facility lj.:)\J (-\L)LT. DO(.,
Type of Facility:
Facility Length:
Facility Width:
Facility Area:
Effective Storage Depth:
Stage O Elevation:
Storage Volume:
Riser Head:
Riser Diameter:
Number of orifices:
Detention Vault
87.27 ft
34.00 ft
2967. sq.
7.42 ft
471.08 ft
22016. cu.
7.39 ft
ft
ft
12.00 inches
3
Full Head Pipe
Orifice # Height Diameter Discharge Diameter
(ft) (in) (CFS) (in)
1 0.00 0.81 0.048
2 3.60 1.20 0.076 4.0
3 5.20 a.so 0.010 4.0
Top Notch Weir: None
Outflow Rating .Curve: None
Stage Elevation Storage Discharge Percolation
(ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs)
0.00 471.08 89. 0.002 0.000 0.00
0.01 471. 09 119. 0.003 0.002 0.00
0.02 471.10 148. 0.003 0.002 0.00
0.03 471.11 178. 0.004 0. 003 0.00
0.04 4 71.12 2o·s. 0.005 0.004 0.00
0.05 471.13 237. 0.005 0. 004 0.00
0.06 471.14 267. 0.006 0. 004 0.00
0.07 471.15 297. 0.007 0.005 0.00
0.21 471.29 712. 0.016 0.008 0.00
0.36 471.44 1157. 0.027 0. Oll 0.00
0.50 471.58 1573. 0.036 0.013 0.00
0.65 471.73 2018. 0.046 0.014 0.00
0.79 471.87 2433. 0.056 0.016 0.00
0.94 4 72. 02 2878. 0.066 0.017 0.00
1. OB 472.16 3294. 0.076 0.019 0.00
1. 23 472.31 3739. 0.086 0. 020 0.00
1. 37 472.45 4154. 0.095 0. 021 0.00
1. 52 472.60 4599. 0.106 0.022 0.00
1.66 472.74 5015. 0.115 0.023 0.00
1.81 4 72. 89 5460. 0.125 0.024 0.00
1. 95 473.03 5875. 0 .135 0. 025 0.00
2.10 473.18 6320. 0.145 0.026 0.00
2.24 473.32 6736. 0.155 0.027 0.00
2.39 473.47 7181. 0.165 0.027 0.00
2.53 473.61 7596. 0.174 0.028 o.oo
2.68 473.76 8041. 0.185 0.029 0.00
2.82 473.90 8457. 0.194 0.030 0.00
2.97 474.05 8902. 0.204 0.031 0.00
3.11 474.19 9317. 0. 214 0.031 0.00
3.26 474.34 9762. 0.224 0.032 0.00
3.40 474.48 10177. 0.234 0.033 0.00
3.55 474.63 10623. 0.244 0.034 0.00
3.60 474.68 10771. 0.247 0.034 o.oo
3.61 474.69 10801. 0.248 0.034 0.00
3.63 474.71 10860. 0. 249 0.035 0.00
3.64 474.72 10890. 0.250 0.037 0.00
3.65 474.73 10919. 0.251 0.039 0.00
3.66 474.74 10949. 0.251 0.041 0.00
3.68 474.76 11008. 0.253 0.045 0.00
3.69 474.77 11038. 0.253 0.046 0.00
3.70 474.78 11068. 0.254 0.047 0.00
3.84 474.92 11483. 0.264 0.054 0.00
3.99 475.07 11928. 0.274 0.060 0.00
4.13 475.21 12343. 0.283 0.065 0.00
4.28 475.36 12789. 0. 294 0.069 0.00
4.42 475.50 13204. 0.303 0.073 0.00
4.57 475.65 13649. 0.313 0.076 0.00
4.71 475.79 14064. 0.323 0.080 0.00
4.86 475.94 14510. 0.333 0.083 0.00
5.00 476.08 14925. 0.343 0.086 0.00
5.15 476.23 15370. 0.353 0.089 0.00
5.20 476.28 15518. 0.356 0.090 0.00
5.21 476.29 1554 8. 0.357 0.090 0.00
5.22 476.30 15578. 0.358 0.091 0.00
5.23 476.31 15607. 0.358 0.092 0.00
5.24 476.32 15637. 0.359 0. 092 0.00
5.39 476.47 16082. 0.369 0. 096 0.00
5.53 476.61 16498. 0.379 0.100 0.00
5.68 476.76 16943. 0.389 0.103 o.oo
5.82 476.90 17358. 0.398 0.106 0.00
5.97 477.05 17803. 0.409 0.109 0.00
6 .11 477.19 18218. 0. 418 0 .112 0.00
6.26 477.34 18664. 0.428 0 .115 0.00
6.40 477.48 19079. 0.438 0.118 0.00
6.55 477.63 19524. 0.448 0 .120 0.00
6.69 477.77 19939. 0.458 0 .123 0.00
6.84 4 77. 92 20385. 0.468 0.125 0.00
6.98 478.06 20800. 0.478 0.128 0.00
7.13 478.21 21245. 0.488 0.130 0.00
7.27 478.35 21660. 0. 497 0 .133 0.00
7. 39 478.47 22016. 0.505 0 .134 0.00
7.49 478.57 22313. 0.512 0.444 0.00
7.59 478.67 22610. 0.519 1.010 0.00
7.69 478.77 22907. 0.526 1. 740 0.00
7.79 478.87 23203. 0.533 2.530 0.00
7.89 478.97 23500. 0.539 2.820 0.00
7.99 479.07 23797. 0.546 3.070 0.00
8.09 479.17 24094. 0.553 3.310 0.00
8.19 479.27 24390. 0.560 3.530 0.00
8.29 479.37 24687. 0.567 3.740 0.00
8.39 479.47 24 984. 0.574 3.930 0.00
8. 49 479.57 25280. 0.580 4.120 0.00
8.59 479.67 25577. 0.587 4.290 0.00
8.69 479.77 25874. 0.594 4.470 0.00
8.79 479.87 26171. 0.601 4.630 0.00
8.89 479.97 26467. 0.608 4.790 0.00
8.99 480.07 26764. 0. 614 4. 94 0 0.00
9.09 480.17 27061. 0.621 5.090 0.00
9.19 480.27 27357. 0.628
9.29 480.37 27654. 0.635
Hyd Inflow Outflow Peak
Target Cale Stage Elev
1 0. 72 0.22 0.22 7.42 478.50
2 0.36 ******* 0 .12 6.54 477.62
3 0.37 ******* 0 .11 5.87 476.95
4 0.38 ******* 0.09 5.07 476.15
5 0.43 ******* 0.09 5.01 476.09
6 0.23 ******* 0.06 3.91 474.99
7 0.30 ******* 0.03 3.29 474.37
8 0.33 ******* 0. 03 2.75 473.83
Route Time Series through Facility
Inflow Time Series File:devwest.tsf
Outflow Time Series File:wout
Inflow/Outflow Analysis
Peak InflOw Discharge:
Peak Outflow Discharge:
Peak Reservoir Stage:
Peak Reservoir Elev:
0.722 CFS
0.222 CFS
7.42 Ft
478.50 Ft
at
at
Peak Reservoir Storage: 22102. Cu-Ft
0.507
Flow Frequency Analysis
Time Series File:wout.tsf
Project Location:Sea-Tac
Ac-Ft
5.230 0.00
5.370 0.00
Storage
(Cu-Ft) (Ac-Ft)
22102. 0.507
19496. 0.448
17498. 0.402
15128. 0.347
14956. 0.343
11683. 0.268
9839. 0.226
8260. 0.190
6,00 on Jan 9 in Year 8
11,00 on Jan 9 in Year 8
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak --Peaks --Rank Return Prob
(CFS) (CFS) (ft) Period
0.120 2 2/09/01 20,00 0.222 7.42 1 100.00 0.990
0.032 7 12/28/01 18,00 0.120 6.54 2 25.00 0. 960
0.086 5 3/06/03 22,00 0.107 5.87 3 10.00 0.900
0.030 8 8/26/04 7,00 0.087 5.07 4 5.00 0.800
0.057 6 1/05/05 15,00 0.086 5.01 5 3.00 0.667
0.087 4 1/18/06 23,00 0.057 3.91 6 2.00 0.500
0.107 3 11/24/06 7,00 0.032 3.29 7 1. 30 0.231
0.222 1 1/09/08 11,00 0.030 2.77 8 1.10 0.091
Computed Peaks 0.188 7. 41 50.00 0.980
Flow Duration from Time Series File,wout.tsf
Cutoff Count Frequency CDF Exceedence Probability
CFS % % %
0.002 34644 56.497 56.497 43.503 0.435E+OO
0.005 4824 7:867 64.364 35.636 0.356E+OO
0.008 5399 8.805 73.169 26.831 0.268E+OO
0.012 3897 6.355 79.524 20.476 0.205E+OO
0.015 4088 6.667 86.190 13.810 0.138E+OO
0.018 2706 4.413 90.603 9.397 0.940E-01
0.022 2069 3.374 93.977 6.023 0.602E-01
0.025 1286 2.097 96.075 3. 925 0.393E-01
0.028 1042 1. 699 97.774 2.226 0.223E-01
0.032 703 1.146 98. 920 1. 080 O.lOBE-01
0.035 327 0.533 99.454 0.546 0.546E-02
0.039 7 0. 011 99.465 0.535 0.535E-02
0.042 11 0.018 99.483 0.517 0.517E-02
0.045 12 0.020 99.503 0.497 0.497E-02
0. 049 32 0.052 99.555 0.445 0.445E-02
0.052 35 0.057 99.612 0.388 0.388E-02
0.055 31 0.051 99.662 0.338 0.338E-02
0.059 20 0.033 99.695 0.305 0.305E-02
0.062 13 0.021 99. 716 0.284 0.284E-02
0.065 12 0.020 99.736 0.264 0.264E-02
0.069 16 0.026 99.762 0.238 0.238E-02
0.072 16 0.026 99.788 0. 212 0. 212E-02
0.075 18 0. 029 99.817 0.183 0 .183E-02
0.079 18 0. 029 99.847 0.153 0.153E-02
0.082 19 0.031 99.878 0.122 0.122E-02
0.085 10 0.016 99. 894 0.106 0.106E-02
0.089 17 0.028 99.922 0.078 0.783E-03
0. 092 5 0.008 99.930 0.070 0. 701E-03
0.095 10 0.016 99.946 0.054 0.538E-03
0.099 3 0.005 99.951 0. 049 0.489E-03
0.102 7 0.011 99.962 0.038 0.375E-03
0.105 5 0.008 99.971 0.029 0. 294E-03
0.109 6 0.010 99.980 0.020 0 .196E-03
0.112 2 0.003 99.984 0.016 0.163E-03
0.116 3 0.005 99.989 0. 011 0 .114E-03
0.119 4 0.007 99.995 0.005 0.489E-04
Duration Comparison Anaylsis
Base File: exwest.tsf
New File: wout.tsf
Cutoff Units: Discharge in CFS
-----Fraction of Time--------------Check of Tolerance-------
Cutoff Base New %Change Probability
0.034 0.81E-02 0.71E-02 -12.1 I 0.81E-02
0.041 0.59E-02 0.52E-02 -11.1 I 0.59E-02
0.048 0.46E-02 0.45E-02 -2.8 I 0.46E-02
0.056 0.34E-02 0.33E-02 -2.4 I 0.34E-02
0.063 0.26E-02 0.28E-02 5.6 I 0.26E-02
0.070 0.19E-02 0.23E-02 19.8 I 0.19E-02
0.078 0.14E-02 0.16E-02 15.3 I 0.14E-02
0.085 0.96E-03 O.llE-02 10.2 I 0.96E-03
0. 092 0.68E-03 0.68E-03 0.0 I 0.68E-03
0.100 0.41E-03 0.47E-03 16.0 I 0.41E-03
0.107 0.21E-03 0.26E-03 23.1 I 0.21E-03
0.114 0.15E-03 0.13E-03 -11.1 I 0.15E-03
0.121 0.65E-04 O.OOE+OO -100.0 I 0.65E-04
Maximum positive excursion= 0.004 cfs ( 6.4%)
occurring at 0.070 cfs on the Base Data:exwest.tsf
and at 0.075 cfs on the New Data:wout.tsf
Maximum negative excursion= 0.008 cfs (-18.7%)
occurring at 0.043 cfs on the Base Data:exwest.tsf
and at 0.035 cfs on the New Data:wout.tsf
Base New %Change
0.034 0.033 -1. 4
0.041 0.034 -17.3
0.048 0.048 -1. 3
0.056 0.055 -1. 4
0.063 0.066 4.9
0.070 0.075 6.0
0.078 0.081 3.7
0.085 0.086 1. 3
0. 092 0 .. 092 0.0
0.100 0.102 2.3
0.107 0.109 1. 7
0 .114 0 .113 -0.6
0.121 0 .119 -2.4
7
'
N
I
R ____ _
8:-r---:;:2:~:;--------
N
0
wout.dur +
wtarget.dur x
O-f-.Dlll]...._ ________ ........::5i:,-------------------
o-
0
0 "~:-t-----------------'\:-----------------
(./) <O
LL u
'-'
g
00 -----
• Probability Exceedence o·+-"'-'-.----..--r.n,nr---,--,-r,--,m-rr--.----r--.,.,..,..,.,.,---,----,r-r-,--,....;.r,--~~..,:r:.,.~=
VAULT
FREQUENCY/ DURATION COMPARISON
EVENDELL
CORE PROJECT NO. 04009
1
Retention/Detention Facility
Type of Facility:
Side Slope:
Pond Bottom Length:
Pond Bottom Width:
Pond Bottom Area:
Top Area at 1 ft. FB:
Effective Storage Depth:
Stage O Elevation:
Storage Volume:
Riser Head:
Riser Diameter:
Number of orifices:
Detention Pond
3.00 H:lV
165.00 ft
78.00 ft
12870. sq. ft
25135. sq. ft
0.577 acres
6.15 ft
452.00 ft
109514. cu. ft
2.514 ac-ft
6.15 ft
18.00 inches
3
Pipe
Orifice # Height
(ft)
Diameter
( in)
1. 75
3.00
2.00
Full Head
Discharge
(CFS)
0.206
0.358
0 .111
Diameter
(in)
1 0.00
2 4.00
3 5.10
Top Notch Weir: None
Outflow Rating Curve: None
Stage Elevation Storage
(ft) (ft) (cu. ft) (ac-ft)
0.00 452.00 0. 0.000
0.02 452.02 258. 0.006
0.04 452. 04 516. 0.012
0.05 452.05 645. 0.015
0.07 452.07 905. 0.021
0.09 452.09 1164. 0.027
0 .11 452 .11 1425. 0.033
0 .13 452.13 1685. 0.039
0.15 452.15 1947. 0.045
0.27 452.27 3528. 0.081
0. 39 452.39 5131. 0 .118
0.51 452.51 6755. 0.155
0.63 452.63 8400. 0.193
0.75 452.75 10068. 0.231
0.87 452.87 11757. 0.270
0.99 452.99 13467. 0.309
1.11 453.11 15200. 0. 349
1. 23 453.23 16955. 0.389
1.35 453.35 18733. 0.430
1.47 453.47 20532. 0.471
1.59 453.59 22355. 0 .513
1. 71 453.71 24199. 0.556
1.83 453.83 26067. 0.598
1.95 453.95 27958. 0.642
2.08 454.08 30032. 0.689
2. 20 454.20 31970. 0.734
2.32 454.32 33932. 0.779
6.0
4.0
Discharge
(cfs)
0.000
0. 011
0.016
0.019
0.022
0.025
0.027
0.030
0.032
0.043
0.052
0.059
0.066
0. 072
0. 077
0.083
0.088
0. 092
0.097
0.101
0.105
0.10~
0 .112
0 .116
0 .120
0.123
0.126
Percolation
(cfs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
o.oo
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Surf Area
(sq. ft)
12870.
12899.
12 92 8.
12943.
12 972.
13002.
13031.
13060.
13090.
13266.
13444.
13623.
13803.
13984.
14166.
14349.
14533.
14718.
14904.
15091.
15279.
15468.
15659.
15850.
16058.
16252.
16446.
2.44 454.44 35917. 0.825 0.130 0.00 16642.
2.56 454.56 37926. 0.871 0.133 0.00 16838.
2.68 454. 68 39959. 0.917 0.136 0.00 17036.
2.80 454.80 42015. 0. 965 0.139 0.00 17235.
2.92 454.92 44095. 1.012 0 .142 0.00 17434.
3.04 455.04 46199. 1.061 0.145 0.00 17635.
3.16 455.16 48327. 1.109 0 .148 0.00 17837.
3.28 455.28 50480. 1.159 0.150 0.00 18040.
3.40 455.40 52657. 1.209 0.153 0.00 18243.
3.52 455.52 54858. 1.259 0.156 0.00 18448.
3.64 455.64 57085. 1. 310 0.159 0.00 18654.
3.76 455.76 59335. 1. 362 0.161 0.00 18861.
3.88 455.88 61611. 1. 414 0.164 o.oo 19069.
4.00 456.00 63912. 1. 467 0.166 0.00 19278.
4.03 456.03 64491. 1. 481 0.169 0.00 19330.
4.06 456.06 65072. 1. 494 0.176 0.00 19383.
4.09 456.09 65654. 1. 507 0.189 0.00 19435.
4 .13 456.13 66433. 1.525 0. 205 0.00 19506.
4.16 456.16 67019. 1.539 0.225 0.00 19558.
4.19 456.19 67606. 1. 552 0. 249 0.00 19611.
4.22 456.22 68196. 1.566 0.275 0.00 19664.
4.25 456.25 68786. 1.579 0. 293 0.00 19717.
4.37 456.37 71165. 1. 634 0.322 0.00 19929.
4.49 456.49 73569. 1.689 0.347 o.oo 20142.
4.61 456.61 75999. 1.745 0.369 0.00 20356.
4.73 456.73 78455. 1.801 0.390 0.00 20572.
4.85 456.85 80936. 1.858 0.408 0.00 20788.
4.97 456.97 83444. 1.916 0.426 0.00 21005.
5.09 457.09 85978. 1.974 0.443 0.00 21224.
5.10 457.10 86190. 1. 979 0.444 0.00 21242.
5.12 457.12 86615. 1.988 0.447 0.00 21279.
5 .14 457.14 87041. 1. 998 0.452 0.00 21315.
5.16 457.16 87468. 2.008 0.459 0.00 21352.
5.18 457.18 87895. 2.018 0.468 0.00 21388.
5.20 457.20 88323. 2.028 0.478 0.00 21425.
5.23 457.23 88967. 2.042 0.489 0.00 21480.
5.25 457.25 89397. 2.052 0.501 0.00 21517.
5.27 457.27 89828. 2.062 0.510 0.00 21553.
5.39 457.39 92427. 2.122 0.538 0.00 21774.
5.51 457.51 95054. 2.182 0.564 0.00 21997.
5.63 457.63 97707. 2.243 0.587 0.00 22220.
5.75 457.75 100386. 2.305 0.609 0.00 22444.
5.87 457.87 103093. 2.367 0.630 0.00 22669.
5.99 457.99 105827. 2.429 0.650 0.00 22895.
6.11 458 .11 108588. 2 .493 0.669 0.00 23122.
6.15 458.15 109514. 2.514 0.675 0.00 23198.
6.25 458.25 111844. 2.568 1.150 0.00 23389.
6.35 458.35 114192. 2.621 2.010 0.00 23580.
6.45 458.45 116560. 2.676 3.120 0.00 23772.
6.55 458.55 11894 7. 2.731 4.430 0.00 23964.
6.65 458.65 121353. 2.786 5.910 0.00 24158.
6.75 458.75 123778. 2.842 7.350 0.00 24352.
6.85 458.85 126223. 2. 8 98 7.890 0.00 24547.
6.95 458.95 128687. 2.954 8.400 0.00 24742.
7.05 459.05 131171. 3. Oll 8.870 0.00 24938.
7.15 459.15 133675. 3.069 9. 320 0.00 25135.
7.25 459.25 136199. 3 .127 9.750 0.00 25333.
7.35 459.35 138742. 3.185 10.160 0.00 25531.
7.45 459.45 141305. 3.244 10.550 0.00 25730.
7.55 459.55 143888. 3.303 10.930 0.00 25930.
7.65 459.65 146491. 3.363 11.290 o.oo 26131.
7.75 459.75 149114. 3.423 11.640 0.00 26332.
7.85 459.85 151757. 3.484 11. 990 0.00 26534.
7.95 459.95 154421. 3.545 12.320 0.00 26736.
8.05 460.05 157104. 3.607 12.640 0.00 26940.
8.15 460.15 159809. 3.669 12.960 0.00 27144.
Hyd Inflow Outflow Peak Storage
Target Cale Stage Elev (Cu-Ft) (Ac-Ft)
1 3.90 ******* 2. 62 6.40 458.40 115486. 2.651
2 1. 94 ******* 0.67 6.14 458.14 109398. 2.511
3 1. 96 0.58 0.58 5.60 457.60 96982. 2.226
4 2.32 ******* 0.50 5.25 457.25 89499. 2.055
5 2.06 ******* 0.42 4.96 456.96 83147. 1.909
6 1. 22 0.17 0.20 4 .13 456.13 66386. 1.524
7 1. 59 ******* 0.16 3.61 455.61 56504. 1. 297
8 1. 73 ******* 0.14 2. 92 454. 92 44126. 1.013
Duration Comparison Anaylsis
Base File: preeast.tsf
New File: eout.tsf
Cutoff Units: Discharge in CFS
-----Fraction of Time--------------Check of Tolerance-------
Cutoff Base New %Change Probability Base New %Change / 0.170 0.82E-02 0.52E-02 -36.7 I 0.82E-02 0.170 0.160 -5.8
0.187 0.70E-02 0.44E-02 -36.3 I 0.70E-02 0.187 0.164 -12.6
0.204 0.62E-02 0.38E-02 -38.5 I 0.62E-02 0. 204 0.165 -19.2
0.222 0.55E-02 0.37E-02 -32.2 I 0.55E-02 0.222 0.168 -24.3
0.239 0.50E-02 0.36E-02 -28.1 I 0.50E-02 0.239 0.174 -26. 9
0.256 0.45E-02 0.35E-02 -22.7 I 0.45E-02 0.256 0.183 -28.4
0.273 0.40E-02 0. 34E-02 -13. 5 0.40E-02 0.273 0.201 -26.4
0. 290 0.36E-02 0. 34E-02 -5.5 0.36E-02 0.290 0.248 -14.5
0.307 0.31E-02 0.31E-02 0.5 0. 31E-02 0.307 0.308 0.5
0.324 0.28E-02 0.29E-02 4.7 0.28E-02 0.324 0.339 4.6
0.341 0.25E-02 0.27E-02 9.2 0.25E-02 0. 341 0.361 5.8
0.358 0.23E-02 0.25E-02 10.8 0.23E-02 0.358 0.375 4.7
0.375 0.20E-02 0.23E-02 15.0 0.20E-02 0.375 0.387 3.3
0.392 0.17E-02 0.19E-02 9.6 0.17E-02 o. 392 0.399 1. 9
0.409 0.14E-02 0.14E-02 3.5 0.14E-02 0.409 0.412 0.7
0.426 0.12E-02 0 .12E-02 -4. 0 0.12E-02 0.426 0.422 -1. 0
0.443 O.lOE-02 0.99E-03 -1. 6 O.lOE-02 0.443 0.441 -0.5
0 .460 0.90E-03 0.90E-03 0.0 0.90E-03 0.460 0.464 0.9
0.477 0.82E-03 0.83E-03 2.0 0.82E-03 0.477 0.478 0.2
0. 494 0.62E-03 0. 72E-03 15.8 0.62E-03 0. 494 0.519 5.0
0 .511 0.52E-03 0. 64E-03 21. 9 0.52E-03 0 .511 0.531 4.0
0.528 0.39E-03 0.55E-03 41. 7 0.39E-03 0.528 0.560 6.0
0.545 0.33E-03 0.44E-03 35.0 0.33E-03 0.545 0.574 5.3
0.562 0.24E-03 0.38E-03 53.3 0.24E-03 0.562 0.594 5.7
0.579 0.20E-03 0.29E-03 50.0 0.20E-03 0.579 0.618 6.6
0.596 0.15E-03 0.23E-03 55.6 0.15E-03 0.596 0.639 7.1
0. 613 0.13E-03 0.20E-03 50.0 0.13E-03 0.613 0.641 4.5
0.630 0. llE-03 0.15E-03 28.6 O.llE-03 0.630 0. 649 2.9
0.648 O.llE-03 0. llE-03 0.0 0. llE-03 0.648 0.649 0.2
0.665 0.49E-04 0.65E-04 33.3 0.49E-04 0.665 0.668 0.5
0.682 0.33E-04 O.OOE+OO -100.0 0.33E-04 0.682 0. 671 -1. 6
Maximum positive excursion = 0. 049 cfs 8.H) v
occuring at 0.590 cfs on the Base Data:preeast.tsf
and at 0.639 cfs on the New Data,eout.tsf
Maximum negative excursion = 0.073 cfs (-28.4%)
occuring at 0.256 cfs on the Base Data:preeast.tsf
and at 0.183 cfs on the New Data:eout.tsf
Flow Frequency Analysis
Time series File:eout.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
0.674 2 2/09/01 20:00
0.158 7 12/29/0110:00
0.503 4 3/06/03 22:00
0.142 8 8/26/04 7:00
0.204 6 1/08/05 3:00
0.424 5 1/18/06 23:00
0.581 3 11/24/06 8:00
2.61 1 1/09/08 10:00
computed Peaks
EOUT. PKS
-----Flow Frequency Analysis-------
--Peaks --Rank Return Prob
(CFS) (ft) Period
2.61 6.40 1 100.00
0.674• 6.15 2 25.00
0.580V 5.60 3 10.00
0.503 5.25 4 5.00
0.424 4.96 5 3.00
0.204,/ 4.13 6 2.00
0. 158 3. 61 7 1. 30
0.142 2.92 8 1.10
1.97 6.35 50.00
Page 1
0.990
0.960
0.900
0.800
0.667
0. 500
0. 231
0.091
0.980
Flow Frequency Analysis
Time series File:preeast.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
0.698 2 2/09/01 18:00
0.238 7 1/05/02 16:00
0. 580 3 2/28/03 3:00
0.060 8 8/26/04 2:00
0.339 6 1/05/05 8:00
0.559 4 1/18/06 20:00
0. 516 5 11/24/06 4:00
0.999 1 1/09/08 9:00
Computed Peaks
PREEAST.PKS
-----Flow Frequency Analysis-------
--Peaks Rank Return Prob
(CFS) Period
0.999 1 100.00 0.990
0.698 2 25.00 0.960 o. 580 ,,,, 3 10.00 0.900
0. 559 4 5.00 0.800
0. 516 5 3.00 0.667
0. 339,/ 6 2 .00 0. 500
0.238 7 1. 30 o. 231
0.060 8 1.10 0.091
0.899 50.00 0.980
Page 1
ELEVATION
459.0
. ~-r ..... ·-
458.0
-~-fr·· \. ,. •~
\,. ' ~-, .
456.0
455.0
454.0
;_ ,;,,
452.0
Actual POND
VOLUME CALCULATIONS
CORE PROJECT NO. 04009
PROJECT NAME: EVENDELL
. '
INCREMENTAL
VOLUME
SF CF
27600 ''
• i . ~-· ' 26,450
25300' '
1-~ ~1 ,. 51,511 ·~
26211 ,. .. "h . . 24,109
22007 ' ..
20,064 ' .. ,
18120 ""' 1i:Y : "11
' . .. ,r
'' 32,638 -_:,;
14518 ,
,. .. t
•·.
.
' .
""
.
'•
i
452.0 12140. .
TOTAL
VOLUME
CF
_n.·:· '_
154,772 .-'
,,,;;:: '' If-".·.
128,322
• i \'-'-~
76,811 -· ;;;• .
52,702
't ·, ;: ~j: q
32,638
.
' -""--
*
""~·.':~-?" i; -~-{ -f.-.,: _,,.{:J'lL, -'· ' .. -'\w; 21,095 36,110 **
450.0 8955 ' ... ,·: ... '..;··, ~-rtr,;t. ..
•
448.0 6060 , 'J
''.-• .J; .,
15,015
·f'!-"' ..
' ,.!--'-.,
* = Total Live Storage m Pond
**=Total Dead Storage in Pond
t---------~ ,. ·-.....·~+ ,,
1.~ o·+-------"'\r;-~-------
<0
0
l(1
eout..dur +
etarget.dur x
.... ,-oo-o======-------~-------------------0
0 ~~+---------------~~---------------
V)O
LL
; ~ Ol.(} oo
£-+--------------------~~~---------vci
(f) ·-0
POND
FREQUENCY/ DURATION COMPARISON
EVENDELL
CORE PROJECT NO. 04009
1
EAST BASIN
The East Basin will utilize a wetpond to accommodate the required Level 2 Flow Control.
The East Basin wetpond will receive runoff from the upstream tributary area as well as
runoff from onsite. The upstream tributary area will be routed through the onsite storm
drainage system to the wetpond.
The allowable release rates will be established by the sum of the upstream tributary runoff
plus the existing onsite runoff. The allowable release rate will be delineated as preeast.tsf
and will be the sum of exeast.tsf + upsteast.tsf. The flows entering the wetpond will be
the sum of the upstream tributary area and the developed site going to the pond. The total
developed flows discharging to the pond will be delineated as posteast.tsf and will be the
sum of deveast.tsf and upsteast.tsf.
The East Basin wetpond (epond.rdf) was sized based on the 1998 KCSWDM and
KCRTS Computer Software Reference Manual. See attached KCRTS printouts and
attached pond volume calculation spreadsheet on the following pages. The stage-storage
of the pond produced by KCRTS was utilized to calculate storage values at the elevations
used to calculate the proposed wetpond that will actually be constructed onsite. The
KCRTS interpolated storage values are listed below.
Elevation Length x Width KCRTS Storage KCRTS Storage *
I 0% Safety Factor
452 165'x78' 0 0
454 177' X 90' 29,000 CF 31,900 CF
456 189'xl02' 63,900CF 70,290 CF
458 20]' X 114' 106,000 CF 116,600 CF
Per the proposed Pond Volume Calculations spreadsheet on the following pages, the
storage values at each delineated elevation is more than the required 10% safety factor
storage values calculated above. The pond is therefore, adequately sized to accommodate
the required I 0% safety factor.
East Basin Wetpond Overflow Elevations
The primary overflow for the pond is the riser pipe within the control structure. The
water surface elevation above the riser for the 100 year developed flow is calculated
assuming all orifices are plugged. To pass the 100-year return period storm, 3.90 cfs,
through a 18" overflow riser will require 0.47 feet of head (From Figure 5.3.4.H in the
1998 KCSWDM: Qweir = 9.739DH312 ~ 3.90 = 9.739(15/12)8312 ~ H = 0.41 feet).
The primary overflow elevation would therefore, be equal to the elevation of the top of
the riser plus the amount of head required to pass the 100-year return period storm, Elev.
458.15 + 0.41 feet= Elev. 458.55.
The secondary overflow for the pond is the jailhouse weir located on the control structure
catch basin. To pass the 100-year return period storm at 0.41 feet of head, a minimum
4.60-foot wide jailhouse weir will be required. The jailhouse weir is analyzed as a notch
weir using the following equation:
Q = C (L-0.2H)H312
where Q = flow (3.90 cfs)
C = 3.27 + 0.40 HIP
H = head above weir (0.41 ft¢:: Use Same Head as Req'd Head Over Riser)
P = depth of storage at weir (Elev. 458.15 -Elev. 452.0 = 6.15 feet)
L = length of the riser (ft)
An emergency overflow spillway will be installed and constructed also as a 12-foot wide
access road to the control structure. The emergency overflow/access road will be
surfaced with asphalt. The emergency overflow spillway will be located at the primary
and secondary overflow elevation 458.41. The 12' wide spillway can accommodate the
100-year return period flow of 3.90 cfs at a head of 0.2'.
Qwo = C (2g)1'2 [(2/3)LH312 + (8/15)(Tan El)H 512 ]
where Q 100 = peak flow (3.90 cfs)
C=0.6
G = 32.2 ft/sec 2
H = head above weir
L = length of weir (12 ft)
El= angle of side slopes (Tan 0 = 10)
3.90= 0.6 (2*32.2)112 [(2/3)(I2)(H)312 + (8/l5)(I0)(H)5'2
]
H=0.2'
C. Water Quality Volume Calculations
Per the Water Quality Applications Map, Basic Water Quality Treatment shall be utilized
to mitigate for the developed storm drainage flows. The wet portion of the wetpond and
wetvault will satisfy this requirement. The required volume will be designed per
KCSWDM Section 6.4.1.1. The following variables were used in the calculation:
Volume Factor (f) = 3
Rainfall= 0.039 feet or 0.47 inches
Area= developed basin
Where Ai= area of impervious surface (sf)
A,g = area of till soil covered with grass (sf)
A,r= area of till soil covered with forest (sf)
Ao= area of outwash soil covered with grass or forest (sf)
V, = [0.9Ai + 0.25A,g + O.IA,r+ O.O!Ao] * (R/12)
Vb= f*Vr
WEST BASIN
Vb= 3*[(0.9)(1.30) + (0.25)(0.51)]0.039 * (43560sf/ac) = 6,613 CF
The dead storage portion of the wetvault is 4.06' deep and has a surface area of 17 feet by
96 feet. The dead storage therefore, has a volume of 6,626 CF which exceeds the
required 6,613 CF.
A minimum flow path length to width ratio of3:l is required for the wet portion of the
vault. The average width is 17' and the length from inlet to outlet is 199'. The length to
width ratio for the vault is therefore, 199' /17' = 11. 7: I which exceeds the required
minimum 3:1.
The sediment storage within the I st cell was designed with I' of average storage and the
sediment storage within the 2nd cell was designed with 0.5' of average storage with
bottom slopes within the vault sloping toward the exterior walls. See email on the
following pages for allowance to slope the bottom toward the exterior walls rather than
towards the center. The average bottom elevation within the!'' cell is (465.44 + 465.59 +
466.29 + 466.44)/4 = 465.94. The top of the sediment storage within the I st cell is
elevation 467.02. The average storage depth within the !st cell is therefore, 467.02-
465.94 = 1.08' which exceeds the required I' average. The average bottom elevation
within the 2"d cell (following the!'' cell) is (466.94 + 466.09)/2 = 466.52. The top of the
sediment storage within the 2nd cell (following the I'' cell) is elevation 467.02. The
average storage depth within the 2nd cell (following the I st cell) is therefore, 467.02 -
466.52 = 0.5 ', which is equal to the required 0.5' average. The average bottom elevation
with the 2nd cell(detention only) is (471.00 + 470.15)/2 = 470.58. The top of the sediment
storage within the 2"d cell (detention only) is elevation 471.08. The average storage depth
within the 2"d cell is therefore, 471.08 -470.58 = 0.5', which is equal to the required 0.5'
average.
EAST BASIN
Vb= 3*[(0.9)(6.69) + (0.25)(3.37))0.039 * (43560sf/ac) = 34,980 CF
The dead storage portion of the wetpond has a volume of36,l lO CF which exceeds the
required 34,980 CF. See Pond Volume Calculations spreadsheet in Section 4B of this
report.
LENGTH TO WIDTH RATIO
A minimum flow path length to width ratio of 4:1 is required for the wet portion of the
pond. (see the attached "Length to Width Ratio" exhibit). If this 4: I ratio can be achieved
then it is not required for the pond to have a dividing berm. The location of the flow path
and and the location that the width of the pond is measured is at one half the water depth.
The MWS of the dead storage is 452.0 and the pond bottom is 448.0. Therefore the travel
path and width is measured at elevation 450.0 (452.0 + 448.0 / 2). The travel path at this
point is 195 feet and the average width of the pond is 39'. This calcu_lates to a length to
width ratio of 5:1 (195/39 = 5.0) which is greater then the 4:1 required.
1 _ __.,..,/
I
i
I
i
I
I
I
--------····
0
'1. E:l
u'S
q'S
&O
t]~
3'.)
? ...,
!,l ..
~Liq
----------·~·-·--
I •
DETENTION POND PLAN
1~5
-:::..
3~ ~;O: \ J
/ 4-·.1
-J l !i ; -. ' C84 • ; f I >-=-'--
I I: !
I ! ! ! '-t-t-+-+, • I !
i:
I
I
I
I
I
I
I
L
I ' I
I
I
k ' I
I ~· I
RE: Evendell Vault Revision Page I of I
CORE -Gina Brooks
From: Hancock, Dave [Dave.Hancock@METROKC.GOV]
Sent: Tuesday, July 20, 2004 7:08 AM
To: CORE -Gina Brooks
Cc: Walken, Jerry; Wong, Wylie
Subject: RE: Evendell Vault Revision
Gina,
I have discussed your proposed revision to the vault design for the plat of Evendell with staff, and have determined that
sloping the floor towards the exterior walls will not impact our ability to maintain the systemin the future. Sediment removal
will be available through the access ports, also located along the exterior of the vault. I would recommend that Wylie
document this revision by approving a minor field change, so the revision will not be challenged when the project is
inspected at later dates.
If you need additional assistance please feel free to e-mail me or call me at 206-296-8230. Dave Hancock
-----Original Message-----
From: CORE -Gina Brooks [mailto:grb@coredesigninc.com]
Sent: Monday, July 19, 2004 1:39 PM
To: dave.hancock@metrokc.gov
Subject: Evendell
Dave,
I am hoping you can help me document your approval of the vault design for Evendell in regards to the bottom sloping
towards the exterior walls rather than the interior. Per Jerry Walken, if I can get approval from maintenance for the sloping
of the vault bottom towards the exterior walls then Comment 3 under Title "Sheet C4.32" of the !st Review Comments will
become non-applicable. Please reply to this email with your approval so that I may attach this email to my response letter for
Wylie Wong's review.
Thanks for your help.
Gina R. Brooks, P.E.
Core Design, Inc.
14 711 NE 29th Place, Suite IO I
Bellevue, WA 98007
425-885-7877
425-885-7963 (fax)
7/20/2004
£llhdl
Ba,
KING COUNTY
WATER QUALITY
APPLICATIONS MAP
EVENDELL
CORE PROJECT NO. 04009
;ii;;: 0.,..
6.4.1 WETPONDS -BASIC AND LARGE-METHODS OF ANALYSIS
FIGURE 6.4.1.A PRECIPITATION FOR MEAN ANNUAL STORM IN INCHES (FEET)
ST 1.1
0.54"
(0.045')
C:::z:J Incorporated Area
~ River/Lake
Major Road
0.47"
(0. 039')
0.47"
(0. 039')
NOTE: Areas east of the easternmost isopluvial should use 0.65
inches unless rainfaJI data is available for the location of interest
~ The mean annual storm is a conceptual storm found
by dividing the annual precipitation by the total number
of storm events per year
ST 1. 0/
LA
0.52"
(0.043'/i.56"
(0.047')
LA 1.0 LA 1.2
0 " 9 ~~~hUkHh C,>~N~?
result, generates large amounts of runoff. For this application, till soil types include Buckley and
bedrock soils, and alluvial and outwash soils that have a seasonally high water table or are underlain at
a shallow depth (less than 5 feet) by glacial till. U.S. Soil Conservation Service (SCS) hydrologic soil
groups that are classified as till soils include a few B, most C, and all D soils. See Chapter 3 for
classification of specific SCS soil types.
1998 Surface Water Design Manual 9/1/98
.6-69
Wetland Recharge Calculations
The following calculation compare the monthly volume of runnoff to the wetland before and
after development. 4 lots have been selected to discharge roof and footing drains to recharge
the wetland.
Predeveloped Condition
Total Upstream Area 54,000 sf
Using the same relative landcovers as the east basin
(see Drainage Report)
Total Basin 10.06 Ac
6.62 Ac
3.26 Ac
0.18 Ac
Therefore, Landcovers for Predeveloped Basin:
Total Basin 1.24 Ac
0.82 Ac
0.40 Ac
0.02 Ac
From WetPRE Timeseries, Total runoff for 8 Water Years=
= 1.24 Ac
% of Basin
Forested 66%
Pasture 32%
Impervious 2%
Forested
Pasture
Impervious
% of Basin
66%
32%
2%
Predeveloped Condition =
6.5 Ac-FT
2,949 cf/month
Developed Condition
Area east of wetland, unchanged in landcover
Using the same relative landcovers as the east basin
(see Drainage Report)
Areas 0.38 Ac
0.25 Ac
0.12 Ac
0.01 Ac
4 Lots conveying to Wetland (Lots 34,35,37 and 38)
Area (measured) 25,060 sf
subract 4 driveways (20'x 30') 2400 sf
Building Area 22,660 sf
assume 70% buildings
Total Basin (A+B)
15,862 sf
0.36 Ac
0.74 Ac
0.25 Ac
0.12 Ac
0.37 Ac
=
(A)
Forested
Pasture
Impervious
=
=
(B)
Forested
Pasture
Impervious
From WetDEV Timeseries, Total runoff for 8 Water Years=
Developed Condition =
0.38 Ac
0.58 Ac
0.52 Ac
8.7 Ac-FT
3,948 cf/month
----=-=------/---·--
-:'."~::-:-:-:-----~-··-"'A > :-~>.••
3
',2 40
,7[H S7:
)Q, I
:;;i
<(
0
~
00 b4
~ 56 "' 55
Sf 0
0
~ 70
68 69
THA<:T G
' • "' r "· -----------
IE 12"
481.66 ~ ."'
..
i(--:-.. ·--·-~----------
...,
"' .,;
0, ....
w\ \ . ~l 1
--... ~-1,·v--.. ---·~i
z\ \
I
29 . I
/ A
1
1I
28
I
J___----;;, I
5. CONVEYANCE SYSTEM ANALYSIS AND DESIGN:
ON-SITE DRAINAGE SYSTEM
The conveyance system for the site was designed for both the 25-year, 24-hour storm and
the 100-year, 24-hour storm. A backwater analysis sheet was generated for both the 25-
year and 100-year return period storms. Total flows from each basin and upstream
tributary area using 15-minute time steps were calculated. The inputs to calculate the
total flows were the same for the West Basin and Upstream Tributary Area (See Section 4
ofthis report) but, varied for the East Basin. The total flows calculated for the East Basin
excludes the Storm and Recreational Tracts (Tracts L & M) since these areas do not enter
the conveyance system.
The inputs used for the KCRTS analysis for the East Basin is sununarized in the table
below:
REVISED EAST BASIN Total Area= 8.94 acres
DEVELOPED CONDITIONS
(deast15)
GROUND COVER AREA/acre)
Till-Grass (Landscapini,) 2.25
Imoervious 6.69
The West Basin flow frequency analysis is attached as dwest15.tsf. The total KCRTS 25-
year return period flow and thelOO-year return period flow for the West Basin are 1.28 cfs
and 1.79 cfs consecutively. The East Basin flow frequency analysis is attached as
<least 15. tsf. The East Basin Upstream Tributary flow frequency analysis is attached as
upeastl5.tsf. And the combination of both time series for onsite and upstream areas for
the East Basin is attached as postel5.tsf. The total KCRTS 25-year return period flow
and the 100-year return period flow for the East Basin are 6.54 cfs and 9.06 cfs
consecutively.
For simplicity, large basin areas going to multiple catch basins were used. For the West
Basin, it was simply assumed that the total flows for the entire basin enter all drainage
pipe. Flows for the large areas within the East Basin were simply calculated as a portion
of the overall 15-minute flows based on the area ratio.
There will be four large basins delineated for the East Basin. See Catch Basin Subbasin
Map on the following pages. The flows for each sub basin is calculated below.
Subbasin Subbasin Percent 25-year Percent 100-year Return
Area Area/East Basin Return Period Period Flow
Flow
Basin A 0.51 AC 0.51/8.94 = 5.70%*6.54 = 5.70%*9.06 = 0.52 cfs
5.70% 0.37 cfs
BasinB 0.80AC 0.80/8.94 = 8.95%*6.54 = 8.95%*9.06 = 0.81 cfs
8.95% 0.59 cfs
Basin C 3.87 AC 3.87/8.94 = 43.29%*6.54 = 43.29%*9.06 = 3.92 cfs
43.29% 2.83 cfs
Basin D 3.76AC 3.76/8.94 = 42.06%*6.54 = 5.70%*9.06 = 3.81 cfs
42.06% 2.75 cfs
Total 8.94AC 8.94/8.94 = 6.54 cfs 9.06 cfs
100%
The tailwater elevations within the wetpond and wetvault were derived from the KCRTS
outfall information (wout.tsf and eout.tsf). The tailwater elevations within the wetvault
for the 25-year and 100-year return periods are El. 477.62 and El. 478.50 consecutively.
The tailwater elevations within the wetpond for the 25-year and 100-year return periods
are El. 458.15 and EL 458.40, respectively.
The backwater analysis was performed to ensure that during the 25-year design storm, the
maximum water surface elevation in each stmcture did not exceed an elevation equal to
0.5' less the rim and during the 100-year design storm, ensuring that if the maximum
water surface elevation does exceed the rim, topography of the basin would allow the
overflow to be conveyed to the next downstream catch basin or the topography would
allow for ponding without causing structural damage.
During the 25-year, the headwater elevations do not exceed 0.5' less the rim. During the
100-year, the headwater elevations exceed the rims of CB 3, CB 30 and CB 31. Overflow
at CB 3 will simply drain to the next downstream catch basin. Drainage overflowing CB
30 and CB 31 will pond and overflow the crown of the road before jumping the curb and
flow to the next downstream catch basin.
····· ... ,, ... ~ os x.nrn: I I OBNllMBER:
\oN
PJPE b HEADWATER
FROM TO FLOW L ENGTJ; ELEVATION CB CB {CFS) {FEE!b-) ffEET) RIMEL
SA 4 0.52 2 .00 4S9.39 462.00 4 3 0.52 s"i.OO 459.42 459.JO .
Outfall SA 8.54 B3 .17 459.34 463.41
•
5A 5 4.73 .05 461.35 465.56
5 6 J.81 i':' .00 461.14 463.15
6 7 3.81 24 .00 462.04 463.15
7 8 J.81 44 .00 462.84 463.36
8 9 3.81 142 .20 464.61 466.16 .
9 10 J.81 2~).00 465.41 466.33 .
9 Ii 3.81 102,.20 466.32 468.23
• Ii 12 3.81 l~l.00 467.02 468.73
11 13 3.81 53 .00 467.43 469.30
13 14 3.81 24'.oo 468.33 469.30
14 15 J,81 1831 .00 472.79 474.76
15 16 3.81 26).00 473.59 475.08 .
SA 17 4.73 32_1_13 464.48 466.76 .
17 18 4.73 24_).oo 465.12 466.76
18 19 4.73 1 Ll.oo 466.13 467.39
17 20 4.73 73 .13 466.66 469.42 .
20 21 4.73 24 i.oo 468.06 469.42
~
20 22 4.73 81 · .00 470.37 472.24
22 23 4.73 90\31 473.00 474.57 .
23 24 4.73 24...1.00 474.20 414.55 .
23 25 4.73 21131 473.94 41511
• 25 26 4.73 24_J.oo 475.14 475.43 .
ZS 27 4.73 99 .00 476.26 477.66 .
23 28 4.73 112 .00 474.95 476.55
28 29 4.73 142 .00 477.46 479.07
29 30 4.73 28 .68 479.70 479.22 .
30 31 4.73 29 .00 480.98 479.25
30 32 0.81 293 '.00 479.86 49!.04
32 33 0.81 181 '.01 479.96 486.52
33 34 0.81 67 .00 480.02 480.60
34 35 0.81 20 '.00 480.05 480.60 .
33 36 0.81 150 .00 480.03 483.81
36 36A 0.81 150 .00 480.11 482.64
36A 37 0.81 89 .00 480.17 482.01
40A 40 1.79 16 .04 477.75 482.10
40 40B 1.79 16 .00 479.38 481.74
40 41 1.19 IOI .04 478.16 482.87
41 42 1.79 66 .00 478.45 478.99
42 43 l.79 34 .00 478.64 478.99
41 44 1.79 189 .04 485.10 490.12
44 45 1.19 30 .00 488.14 490.12
44 46 1.79 78 .04 485.SO 487.83
46 47 1.19 ,,
.00 485.75 487 .83
46 48 l.79 35 .00 485.88 487.84
44 49 1.79 172 .00 489.13 491.8! 49 50 1.79 30 .00 4S9 .70 491.78
L
JOB !'.,\.\IE:
OB NUJ\IB£R:
FROM
CB
TO FLOW
CB tCFS'
SA 4 OJ7
4 0.37
Outfall 5A 6.17
SA 3.42
6 2.75
7 2.75
7 2.75
9 2.15
9 10 2.75
9 11 2.75
11 12 2.15
11 13 2,75
13 14 2.75
14 15 2.75
15 16 2.75
SA 17 3.42
17 18 3.42
18 19 3.42
17 20 3.42
20 21 3.42
20 22 3.42
22 23 3.42
23 24 3A2
23 2S 3.42
25 26 3.42
25 27 3.42
23 28 3.42
28 29 3.42
29 30 3.42
30 31 3.42
30 32 0.59
32 33 0.59
33 34 0.59
34 3S 0.59
33 36 0.59
36 36A 0.59
36A 37 059
40A 40
40 40B 128
40 41 1.28
41 42
42 43 1.28
41 44 1.28
44 4S 1.28
44 46 J.28
46 47 J.'.!8
46 48 128
44 49 1.28
49 so 1.28
.. ·-:-:-:,=:11
It
PIPEbN
LENGj
(FEET
HEADWATER
~:LEVATION
,oo
~00 .
•.09
9
•.03
•.II
2'
•.00
10'
•.II
s,
,,oo
•.00 ,,
·.07
24
11'·00
•,00
731
•.07
241
•.00
811
90',00
r.16
241
•.oo
211
'.16
241
1.00
991
ll2 1
142 1·00
28 00
JS
29
.00
293
181 .00
.00
67
20 .00
.00
150
150 .00
89 .00
•.00
16
16
1.00
IOI I
1,0?
66 I
34 !.00
1.00
189
1.02
30
1.00
78
).02
22
1,00
35 l
1.0-0
\72 I
30 J.00
.00
{FEET) RIM EL
458.67 462.00
458.68 459.30
458.64 463.41
460.52 465.56
4o0.77 463.15
461.23 463.15
461.65 46336
463.36 466.16
464.12 466.33
465.88 468.23
466.24 468.73
466.88 469.30
467.34 469.30
472.53 474.76
47295 475.08
464.36 466.76
464.69 466.76
4(,5.24 467.39
466.68 469.42
467 .39 469.42
469.93 472.24
472.41 474.57
473.04 474.55
473.01 475.22
473.64 475.43
475.60 477.66
473.88 476.55
475.35 479.07
476.52 47912
477 .68 479.25
476.77 491.04
477 .67 486.52
478.02 480.60
478.21 480.60
478.71 483.81
479.46 482.64
479.92 482.01
477.69 482.10
479.32 481.74
477.90 482.87
478.04 478.99
478.14 478.99
485.06 490.12
488.08 490.12
485.45 487.83
485.69 487.83
485.82 487 .84
489.06 49l.8\
489.64 491.78
Flow Frequency Analysis
Time Series File:dwestlS.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
0.619 6 8/27/01 18:00
0.432 8 9/17/02 17:45
1. 28 2 12/08/02 17:15
0.499 7 8/23/04 14:30
0.689 5 11/17 /04 5:00
0. 726 4 10/27/05 10:45
0.857 3 10/25/06 22:45
1. 79 1 1/09/08 6:30
Computed Peaks
-----Flow Frequency Analysis-------
--Peaks Rank Return Prob
(CFS) Period
l. 79 1 100.00 0.990
1. 28 2 25.00 0.960
0.857 3 10.00 0.900
0. 726 4 5.00 0.800
0.689 5 3.00 0.667
0.619 6 2.00 0.500
0 .499 7 1. 30 0.231
0.432 8 1.10 0.091
1. 62 50.00 0.980
Flow Frequency Analysis
Time Series File:deastl5.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
3.18 6 8/27/01 18:00
2.22 8 9/17/02 17:45
6.52 2 12/08/02 17:15
2.57 7 8/23/04 14 :30
3.51 5 10/28/04 16:00
3.71 4 10/27/05 10:45
4.40 3 10/25/06 22:45
9.03 1 1/09/08 6:30
Computed Peaks
-----Flow Frequency Analysis-------
--Peaks Rank Return Prob
(CFS) Period
9.03 1 100.00 0.990
6.52 2 25.00 0.960
4.40 3 10.00 0.900
3.71 4 5.00 0.800
3.51 5 3.00 0.667
3.18 6 2.00 0.500
2.57 7 1. 30 0.231
2.22 8 1.10 0.091
8.19 50.00 0.980
Flow Frequency Analysis
Time Series File:upeastlS.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
0.024 2 2/09/01 17:15
0.007 7 1/06/02 2:30
0.017 4 3/06/03 18:30
0.001 8 3/08/04 22:45
0. Oll 6 1/05/05 7: 30
0.018 3 1/18/06 20:15
0.015 5 11/24/06 4:15
0.039 1 1/09/08 9:30
Computed Peaks
-----Flow Frequency Analysis-------
--Peaks Rank Return Prob
(CFS) Period
0.039 1 100.00 0.990
0.024 2 25.00 0.960
0.018 3 10.00 0.900
0.017 4 5.00 0.800
0.015 5 3.00 0.667
0.011 6 2.00 0.500
0.007 7 1. 30 0.231
0.001 8 1.10 0.091
0.034 50.00 0.980
Flow Frequency Analysis
Time Series File:postel5.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak --Peaks Rank Return Prob
(CFS) (CFS) Period
3.18 6 8/27/01 18:00 9.06 1 100.00 0.990
2.22 8 9/17/02 17:45 6.54 2 25.00 0.960
6.54 2 12/08/02 17:15 4.40 3 10.00 0.900
2.57 7 8/23/04 14:30 3. 71 4 5.00 0.800
3.51 5 10/28/04 16:00 3.51 s 3.00 0.667
3.71 4 10/27/05 10:45 3.18 6 2.00 0.500
4.40 3 10/25/06 22:45 2.57 7 1. 30 0.231
9.06 1 1/09/08 6:30 2.22 8 1.10 0.091
Computed Peaks 8.22 50.00 0.980
Flow Frequency Analysis
Time Series File: wout. tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak --Peaks --Rank Return
(CFS) (CFS) (ft) Period
0.120 2 2/09/01 20:00 0.222 7.42 1 100.00
0.032 7 12/28/01 18,00 0.120 6.54 2 25.00
0.086 5 3/06/03 22:00 0.107 5.87 3 10.00
0.030 8 8/26/04 7,00 0.087 5.07 4 5.00
0.057 6 1/05/05 15:00 0.086 5.01 5 3.00
0.087 4 1/18/06 23,00 0.057 3.91 6 2.00
0.107 3 11/24/06 7:00 0.032 3.29 7 1. 30
0.222 1 1/09/08 11 :00 0.030 2. 77 8 1.10
Computed Peaks 0.188 7.41 50.00
0 6~, L00Q_(Q_u.:: ~,103--t (o.:A--_4,7.(pf
I ou L~( 1_;0 ':) c_\.,Lu :c-4, 1. 06 -\-, .4;1..= 4;, '6 .. X)
Prob
0.990
0. 960
0.900
0.800
0.667
0.500
0.231
0. 091
0.980
Flow Frequency Analysis
Time series File:eout.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
0.673 2 2/09/01 20:00
0.164 7 12/29/01 10:00
0.505 4 3/06/03 22:00
0.148 8 8/26/04 7:00
0.177 6 1/08/05 2:00
0.408 5 1/18/06 23: 00
0.572 3 11/24/06 8:00
2.20 1 1/09/08 10:00
computed Peaks
EOUT. PKS
-----Flow Frequency Analysis-------
--Peaks --Rank Return Prob
(CFS) (ft) Period
2.20 7.11 1 100.00 0.990
0.673 6.69 2 25 .oo 0.960
0. 572 6.11 3 10.00 0.900
0. 505 5.81 4 5 .00 0.800
0.408 5.47 5 3.00 0.667
0.177 4.55 6 2.00 0. 500
0.164 3.87 7 1. 30 0.231
0.148 3.19 8 1.10 0.091
1.69 7.06 50.00 0.980
25-year water surface= 451.0 + 6.69 = 457.69
100-year water surface= 451.0 + 7.11 = 458.11
Page 1
OFF-SITE DRAINAGE SYSTEM
Some culverts along SE 136th Street and l 60'h Avenue SE are to be relocated, added,
and/or replaced. Also, due to proposed shoulder construction along 160th Avenue SE, the
existing ditch along the west side of the road will be relocated behind the proposed
shoulder. A tightlined storm line will bypass stormwater from the l 60'h roadside ditch
and areas upstream of the project site down to the a discharge point near the southeast
comer of the proposed Nichols development. Storm water from the Evendell plat' s
stormwater pond will enter this system at the project site's southeast comer, upstream of
the system's discharge point. The off-site drainage system was sized to convey the 25-
year and 100-year flows calculated in the Level 3 Downstream Drainage Analysis by
Haozous Engineering, dated August 26, 2002. See Section 6 of this report for a copy of
the report. The King County Backwater (KCBW) program was used to analyze the
capacity of this entire system along 160'\ including the tightlined portion, the open
channel and the culvert under 136th Street. The output from the KCBW analysis follows
at the end of this section.
In order to determine a tailwater depth at the conveyance system's discharge point, the
existing ditch downstream of this point was analyzed to determine the flow depth that
would be realized to convey the 100-year storm event flows. The flows provided in the
Haozous report at node #117 were used to analyze this system. The discharge from the
Evendell detention pond will match the existing site discharge for the 25-year event, but
will exceed the existing by 1.6 cfs for the 100-year event. So, the total flow at the
downstream discharge point will be: Q25 = 18.3 cfs and Qioo = (22.5 + 1.6) = 24.1 cfs. In
Section 3 of their report, Table 1 -Description of Downstream Conveyance System ,
describes the ditch in this area as having a 2' wide bottom, 1.5' of depth, 3:1 sideslopes
and a 2% slope. A Manning's 'n' value of0.050 was used to represent a "constructed
channel with a clean bottom and brush on the sides". As shown on the attached
spreadsheet titled J 6dhDitch Analysis -Existing@ Outfall, the flow depth in the ditch
would be 1.26 feet and the velocity 3.4 fps, when conveying the 100-year storm event
flow of 25 cfs. The outfall has an invert elevation of 444.86, so the tailwater elevation
was determined to be 446.12, which was used for all of the KCBW analyses, both for the
25-year and 100-year events.
Flows input into the KCBW program for each segment of the conveyance system were
adjusted to account for the stormwater contributed to the system by runoff from 160th and
from the Evendell pond discharge. The flows used were as follows:
Downstrean1 of Outfall 1 B:
CB 1 to Outfall lB:
Input to CB 1 from Pond:
Input to CB 1 from 160'h:
CB IA to CB 1 and upstream:
llis {cfs)
18.3
17.6
0.7
0.4
16.5
Q100 (cfs)
24.1
23.0
2.6
0.5
19.9
The same flow values calculated for the run from CB I A to CB I were used for the rest of
the system upstream of CB I A, rather than attempting to approximate the gradually
increasing flows that will enter the open channel due to runoff from 160'\
As shown on the KCBW program output that follows this report, the system of pipes,
open channel and culverts proposed for the project's frontage on 160 1h Avenue SE will
have adequate capacity to convey the design storm events. Additionally, the velocity in
the open channel portion of this system is shown to be Jess than 5 fys, so grass lining is
appropriate for this channel.
,,.··, .,f
1··.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·. ·.· .•. ·.· .·. ·.·.·.·.·.·.· .•. ·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.· ·.·.·.·.·.· .•. ·.·.· ·.·.· ·.·.· .·.·.·.· .·.· .. ·.·.·.·.·.·.·.· .. ·.·.·.· .. 1. ·•1··60· ·T· ·H· .... D. ·1'T'n·H· ... A. ·N·A·· ·L··•'7 S·1·s·>•·• ·EX·I·s=1G· ··>@· · ·· .. o· T·T'T'F·A· >t···t·· ::>::.-:./:.>..:_ /_:::..:.:J:Y:._:/\: .·: :. .. :.:.:-::_·:::J::: :· .. :.: :· .. :::::-::: .. .::,:.:-:-:.: .· .. :~:~{:'!:..·:·.::::: .· :::.:·:.};.;;i_:}.::·.-< :-..:-.·:.:.:·:
DITCH DATA:
BOTTOM WIDTH (FT)=
LEFT SIDE SLOPE (L:1)
RIGHT SIDE SLOPE (R:l
BOTTOM SLOPE (FT/FT
MANNING'S n =
FLOW FLOW
DEPTH
(FEET)
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60
0.65
0.70
0.75
0.80
0.85
0.90
0.95
1.00
1.10
1.20
1.24
1.30
1.40
1.50
1.60
1.70
1.80
1.90
2.00
AREA
(SQ l<'T)
0.0000
0.1075
0.2300
0.3675
0.5200
0.6875
0.8700
1.0675
1.2800
1.5075
1.7500
2.0075
2.2800
2.5675
2.8700
3.1875
3.5200
3.8675
4.2300
4.6075
5.0000
5.8055
6.7200
7.1230
7.6700
8.6800
9.7500
10.8800
12.0700
13.3200
14.6300
16.0000
2.00 JOB NAME: EVENDELL
3.00 JOB#: 04009
3.00 OPERATOR: S.R.B.
0.0200 DATE: 10/9/2004
0.050
WETTED
PERIMETER
(FEET)
0.0000
2.3162
2.6325
2.9487
3.2649
3.5811
3.8974
4.2136
4.5298
4.8460
5.1623
5.4785
5.7947
6.1110
6.4272
6.7434
7.0596
7.3759
7.6921
8.0083
8.3246
8.9390
9.5895
9.8627
10.2219
10.8544
11.4868
12.1193
12.7517
13.3842
14.0167
14.6491
HYDRAULIC
RADIUS
(FEET)
0.0000
0.0464
0.0874
0.1246
0.1593
0.1920
0.2232
0.2533
0.2826
0.3111
0.3390
0.3664
0.3935
0.4201
0.4465
0.4727
0.4986
0.5243
0.5499
0.5753
0.6006
0.6495
0.7008
0.7222
0.7503
0.7997
0.8488
0.8977
0.9465
0.9952
1.0438
1.0922
DITCH
CAPACITY
(CFS)
0.000
0.058
0.190
0.385
0.642
0.962
1.346
1.796
2.317
2.909
3.576
4.321
5.146
6.054
7.047
8.129
9.303
10.570
11.933
13.396
14.960
18.300
22.283
24.100
26.620
31.431
36.737
42.556
48.906
55.805
63.271
71.322
FLOW
VELOCITY
(FPS)
0.000
0.543
0.828
1.049
1.235
1.399
1.547
1.683
1.810
1.930
2.043
2.152
2.257
2.358
2.455
2.550
2.643
2.733
2.821
2.907
2.992
3.152
3.316
3.383
3.471
3.621
3.768
3.911
4.052
4.190
4.325
4.458
Plat of Evendell -KCBW Program Output
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:04009bl.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:446.12 feet
Discharge Range:17.6 to 23. Step of 5.4 [cfs]
Overflow Elevation:461. feet
Weir:NONE
Upstream Velocity:3.4 feet/sec
PIPE NO. 1: 59 LF -24"CP @ 1.00%
OVERFLOW-EL: 449.91 BEND:
OUTLET: 444.86 INLET: 445.45 INTYP: 5
JUNC NO. 1: 0 DEG DIA/WIDTH: 2.0 Q-RATIO: 0.00
Q (CFS) HW (FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
17.60
23.00
2.09
2.65
447.54 * 0.012 1.52 1.26 1.26 1.26 1.52 *****
448.10 * 0.012 1.71 1.54 1.26 1.54 1.71 *****
2.09
2.65
PIPE NO. 2:
JUNC NO. 2:
239 LF -24"CP @
OVERFLOW-EL: 454.77
1. 80%
BEND:
OUTLET: 445.45 INLET: 449.75 INTYP: 5
0 DEG DIA/WIDTH: 6.0 Q-RATIO: 0.18
Q (CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
17.60
23.00
2.26
2.95
452.01 * 0.012 1.52 1.05 2.09 2.09 1.52 *****
452.70 * 0.012 1.71 1.24 2.65 2.65 1.71 *****
2.26
2.95
PIPE NO. 3: 291 LF -24"CP @ 2.84% OUTLET: 449.75 INLET: 458.00 INTYP: 5
Q (CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
14.92
19.49
2.04
2.66
460.04
460.66
* 0.012
* 0.012
1. 40
1.59
0.84
0.97
2.26
2.95
2.26
2.95
1.40 *****
1.59 *****
2.04
2.66
BACKWATER COMPUTER PROGRAM FOR OPEN CHANNELS
Channel Data Filename,04009b3.bwc
Tailwater from HW/TW File,04009bl.bwt
Discharge Range,16.5 to 19.9 Step of 3.4 [cfs]
STATION 0.00, INVERT= 461.00 FT EC=l. 15 Q-RATI0=0. 00
CROSS-SECTION DATA,
DIST/STAGE IS MEASURED FROM INVERT; N-FAC IS MEASURED BETWEEN STAGES
LEFT(FT) STAGE(FT)
4.50 1.50
N-FACTOR
0.050
*
*
RIGHT(FT) STAGE(FT)
4.50 1.50
N-FACTOR
0.050
Q(CFS) Yl (FT) WS ELEV. * YC-IN YN-IN Q-TW TW-HT N-Yl A-Yl WP-Yl V-Yl
*******************************************************************************
16.50 1.17
****************
19.90 1.26
462.17 * 1.17 1.15 16.50
RANGE EXCEEDED IN HW/TW FILE -
462.26 * 1.26 1.23 19.90
0.00 0.050 4 .11 7.40 4.02
DATA EXTRAPOLATED*************
0.00 0.050 4.76 7.97 4.18
****REACH NO. 1:
STATION 110.00,
CROSS-SECTION DATA,
LENGTH= 110.00 FT
INVERT= 466.00 FT
AVG.GRADE= 4.55% ****
EC=l.15 Q-RATI0=0. 00
DIST/STAGE IS MEASURED FROM INVERT; N-FAC IS MEASURED BETWEEN STAGES
LEFT(FT) STAGE(FT) N-FACTOR
0.050
*
*
RIGHT(FT) STAGE(FT) N-FACTOR
0.050 4.50 1.50 4.50 1.50
Q(CFS) Yl (FT) WS ELEV. * YC-IN YN-IN YC-OT YN-OT N-Yl A-Yl WP-Yl V-Yl
*******************************************************************************
16.50
19.90
1.16
1.24
****REACH NO. 2:
STATION 203.00,
CROSS-SECTION DATA,
467.16 * 1.17 1.16 1.17 1.15 0.050
467.24 * 1.26 1.24 1.26 1.23 0.050
4.04
4.61
LENGTH= 93.00 FT
INVERT= 470.00 FT
AVG.GRADE= 4.30% ****
EC=l.15 Q-RATI0=0.00
7.34 4.09
7.84 4.31
DIST/STAGE IS MEASURED FROM INVERT; N-FAC IS MEASURED BETWEEN STAGES
LEFT(FT) STAGE(FT)
4.50 1.50
N-FACTOR
0.050
*
*
RIGHT(FT) STAGE(FT)
4.50 1.50
Q (CFS) Yl (FT) WS ELEV. * YC-IN YN-IN YC-OT YN-OT N-Yl
N-FACTOR
0.050
A-Yl WP-Yl V-Yl
*******************************************************************************
16.50
19.90
1.16
1.24
471.16
4 71. 24
*
*
1. 17 1.15
1.26 1.23
1.17
1. 26
1.16 0.050
1.24 0.050
4.04
4.61
7.34
7.84
4.09
4.31
****REACH NO. 3:
STATION 290.00:
CROSS-SECTION DATA:
LENGTH= 87.00 FT
INVERT= 474.00 FT
AVG.GRADE= 4.60% ****
EC=l.15 Q-RATI0=0.00
DIST/STAGE IS MEASURED FROM INVERT; N-FAC IS MEASURED BETWEEN STAGES
LEFT(FT) STAGE(FT)
4.50 1.50
N-FACTOR
0.050
*
*
RIGHT(FT) STAGE(FT)
4.50 1.50
Q(CFS) Yl (FT) WS ELEV. * YC-IN YN-IN YC-OT YN-OT N-Yl
N-FACTOR
0.050
A-Yl WP-Yl V-Yl
*******************************************************************************
16.50
19.90
1.17
1.26
****REACH NO. 4:
STATION 400.00:
CROSS-SECTION DATA:
475.17 *
475.26 *
1.17
1.26
LENGTH= 110.00 FT
INVERT= 478.00 FT
1. 20
1.28
1.17
1.26
1. 15 0. 050
1.23 0.050
4.11
4.76
AVG.GRADE= 3.64% ****
EC=l.15 Q-RATI0=0. 00
7.40
7.97
4.02
4.18
DIST/STAGE IS MEASURED FROM INVERT; N-FAC IS MEASURED BETWEEN STAGES
LEFT(FT) STAGE(FT)
4.50 1.50
N-FACTOR
0.050
*
*
RIGHT(FT) STAGE(FT)
4.50 1.50
Q(CFS) Yl (FT) WS ELEV. * YC-IN YN-IN YC-OT YN-OT N-Yl
N-FACTOR
0.050
A-Yl WP-Yl V-Yl
*******************************************************************************
16.50
19.90
1. 28
1. 38
479.28 * 1.17 1.28 1.17 1.20 0.050
479.38 * 1.26 1.38 1.26 1.28 0.050
4.92
5.71
8.10 3.36
8.73 3.48
****REACH NO. 5: LENGTH= 30.00 FT
INVERT= 478.75 FT
AVG.GRADE= 2.50% ****
STATION 430.00: EC=l.15 Q-RATI0=0.00
CROSS-SECTION DATA:
DIST/STAGE IS MEASURED FROM INVERT; N-FAC IS MEASURED BETWEEN STAGES
LEFT(FT) STAGE(FT)
4.50 1.50
N-FACTOR
0:050
*
*
RIGHT(FT) STAGE(FT)
4.50 1.50
Q (CFS) Yl (FT) WS ELEV. * YC-IN YN-IN YC-OT YN-OT N-Yl
N-FACTOR
0.050
A-Yl WP-Yl V-Yl
*******************************************************************************
16.50
19.90
1. 28
1. 38
480.03
480.13
ROUTING DATA RESULTS:
STAGE(FT) DISCHARGE(CFS)
0.00
1.17
1. 26
0.00
16.50
19.90
ROUTING DATA RESULTS:
STAGE(FT) DISCHARGE(CFS)
0.00 0.00
1.17 16.50
1.26 19.90
* 1.17 0.00
* 1.26 0.00
STORAGE(CU-FT)
0.0
1821.2
2100.1
STORAGE(CU-FT)
0.0
1821. 2
2100.1
File Opened for Writing:04009b3.bwt
Save results to HW/TW file:04009b3.bwt
File Opened for Writing:04009b3.RS1
Save results to Routing file:04009b3.RS1
1.17 1.28 0.050
1.26 1.38 0.050
PERM-AREA(SQ-FT)
0.0
3228.9
3466.9
PERM-AREA (SQ-FT)
0.0
3228.9
3466.9
4.92
5. 71
8.10 3.36
8.73 3.48
BACKWATER PROGRAM FOR ROUND/ARCH CULVERTS
Tailwater from HW/TW File:04009b3.bwt
Discharge Range:16.5 to 19.9 Step of 3.4 [cfs]
Overflow Elevation:483.5 feet
Weir:NONE
Upstream Velocity:4. feet/sec
CULV NO. l: 94 LF -24"CP @ 0.80% OUTLET: 478.75 INLET: 479.50 INTYP: 3
TW DATA ADJUSTED BASED ON CROSS-SECTIONAL AREA
Q-TOT(CFS) TW(FT) TW-ELEV(FT) Q-ADJ(CFS) AREA(SQ-FT)
********************************************************************
Q(CFS)
0.00
16.50
19.90
HW (FT)
0.00
1. 28
1. 38
478.75
480.03
480.13
HW ELEV. * N-FAC DC
0.00
16.50
19.90
DN TW
0.00
2.12
2.31
DO DE HWO HWI
*******************************************************************************
16.50
19.90
2.35
3.12
481.85 * 0.012
482.62 * 0.012
1.47
1. 61
1. 30
1. so
1.28
1. 38
1.30
1.50
1. 47
1.61
*****
*****
2.35
3.12
6. SPECIAL REPORTS AND STUDIES:
Included in this section are the postmaster approval; the Preliminary T.l.R. by Haozous
Engineering., dated June 15, 200 I; the Level 3 Downstream Drainage Analysis by
Haozous Engineering., dated August 26, 2002; the Preliminary Geotechnical Engineering
Report by US Land Development Associates, dated November 16, 2001; the Wetland
Report by Habitat Technologies, dated October 28, 2002 (addendum) and May 15, 2001;
the vault structural plans as prepared by Miles Consulting, dated May 2004, a letter from
Bruce and Joyce Osgoodby (property owners on north side of SE 1361h Street), dated July
14'\ 2004, allowing permission to enter the property for installation of rockery and
regrading of existing driveway; a letter from Bruce and Joyce Osgoodby, dated September
27'\ 2004, allowing permission to enter the property for reconstruction of keystone wall;
transfer of density credit documentation; copy of Boundary Line Adjustment; copy of
recorded drainage easement; response to Hearing Examiner's Condition #19-a; Technical
Memorandum addressing Retaining Wall along north edge of SE 1361h St., prepared by
Associated Earth Sciences, Inc., dated November 3, 2004; Pedestrian Path approval letter
from Issaquah School District, dated November 7, 2004.
'" ll.
--s
'" I\J
2
u -r
,'.::j
z: 1•.· ;:,
'-" ~-'.
~:
U. •;!
'"
.. ,
t,)
l'-1
'" "'
,, ....
• • • ' ' ' \ ..
' ' ' ' ' • ' ' ' • \
\
'
L-.--~C'> :.-, ••• I',,..,..., ----=-=-·=-----------r----= ~ ., 'I ,. .. ....
-'
'~
.
ii
~ ~
1 i I •
R
~ij) -.
.
~
• ·--
• e
•
..
• i I
~ '31\\il-:P.L. r---------------
t,. d t,02 'ON JNI N~I53CT 3~0) WdSE:T t,002'S ·~dtJ
•
i
Even.dell Plat
Preliminary Technical Information Report
Submitted to:
King County DDES
900 Oakesdale Avenue S.W.
Renton, WA 98055
Prepared by:
Haozous Engineering, P.S.
14816 SE 116th Street
Renton, WA 98059
Tel. ( 425) 235-2707
Fax ( 425) .254-0579
June 15, 2001
@fj§!W&Sf,<,·S§lti&"3'1@i&¥&¥&:a: i· 't #5 's1ki!@ g,, 0 ,; 5 ii.
t''?
TABLE OF CONTENTS
1. Project Overview ...................................................... : ........................................................ 1-1
2. Conditions and Requirements Summary ........................................................................... 2-1
3. Offsite Analysis ................................................................................................................. 3-1
4. Flow Control and Water Quality Facility Analysis and Design ....................................... .4-1
5. Conveyance System Analysis and Design ......................................................................... 5-1
6. Special Reports and Studies .............................................................................................. 6-1
7. Other Permits ................................................................................. : .................................. 7-1
8. ESC Analysis and Design ................................................................................................. 8-1
9. Bond Quantities, Facility Summaries, and Declaration of Covenant.. .............................. 9-1
10. Operations and Maintenance Manual.. .......................................................................... 10-1
11. References ..................................................................................................................... 11-l
LIST OF TABLES
Table 1. Description of Downstream Conveyance System ................................................... 3-5
Table 2. Existing and Developed Site Basin Conditions ..................................................... .4-2
Table 3. Summary of Performance Standards ....................................................................... 4-3
Table 4. Wet Pond Sizing Calculations .............................................................................. .4-11
Table 5. Summary of Special Reports and Studies ............................................................... 6-1
Table 6. Summary of Other Permits Required ....................... : ........................................ : ..... 7-1
Table 7. Summary of Maintenance Requirements for Stormwater Facilities ..................... 10-1
".~
'·
)
b
D
I
D
b
LIST OF FIGURES
Figure 1. TIR Worksheet.. ........................................................................... : ......................... 1-2
Figure 2. Vicinity Map .......................................................................................................... 1-5
Figure 3. Drainage Basins ..................................................................................................... 1-6
Figure 4. Soils Map ............................................................................................................... 1-7
Figure 5. Downstream Conveyance System .......................................................................... 3-4
Figure 6. Stormwater System Design .................................................................................... 4-6
Figure 7 A. Flow Duration Curves for RID -East Basin ...................................................... .4-7
Figure 7B. Flow Duration Curves for RID -West Basin ...................................................... 4-9
Figure 8. Erosion and Sedimentation Control Plan ............................................................... 8-2
Figure 9. Site Improvement Bond Quantity Worksheet ........................................................ 9-2
Figure 10. Flow Control and Water Quality Facility Summary ............................................ 9-3
APPENDICES
Appendix A. Downstream System
Appendix B. Stormwater RID System Design
Appendix C. Conveyance Calculations
Appendix D. Hydrologic Model Documentation
;;
1. Project Oierview
Project Description
A swnmary of the Evendell Plat project is provided in the TIR Worksheet (Figure I). This
preliminary technical information report (TIR) addresses the design of stormwater facilities and
the offsite drainage analysis for the Evendell Plat project. The Evendell Plat project is a
proposed residential development located within the Renton Highlands area of unincorporated
King County (Figure 2). The proposal for development includes building 75 single-family
dwellings on approximately 12 acres. Road improvements along SE 136th Street are also
proposed. The proposed site plan is provided in Figure 6 of Section 4.
Site Description
The site is located within the Orting Hills subbasin of the Cedar River watershed (King County
Department ofNatural Resources, 1999). The site consists of two basins. The topography of the
east basin generally slopes from the northwest to the southeast (Figure 3). The topography of the
west basin generally slopes from the east to the west. The elevation of the site ranges from about
494 feet (NAVD 88) in the north portion of the site to 456 feet in the southeast comer.
The project is located east of 156th Avenue SE and is bordered by SE 136th Street on the north
and by 1601h Avenue SE on the east. Cover types on the site include a single-family residence,
pasture, and forest (Photo I in Appendix A. I). A Class 2 wetland has been identified in the
northeast portion of the site. Based on King County Soil Survey (U.S. Department of
Agriculture, 1973) the site consists of Alderwood soils (Figure 4).
Drainage from an approximately 0.94-acre tributary subbasin adjacent to the west boundary of
the easterly basin sheet flows onto the site (Figure 3). The easterly basin drains to a conveyance
system along 1601h Avenue SE. The westerly basin drains to a conveyance system along 156th
Avenue SE. Both downstream drainage courses eventually discharge to an unclassified tributary
of the Cedar River (King County Department of Parks, Planning, and Resources, 1990).
Stormwater Design
Under developed conditions, stormwater from the site and offsite road improvements will be
collected and treated onsite to basic water quality standards. A combined wetpond/detention
pond will be used to manage runoff in the easterly basin. A small wetvault will provide water
quality treatment to a portion of SE 136th Street that bypasses the stormwater facility in the east
basin. A vault followed by a biofiltration swale will be used to manage runoff in the westerly
basin. Level 2 RID standards are required by the King County Flow Application Maps and
recommended by Lower Cedar River Basin and Nonpoint Action Plan. Natural discharge
locations from the site will be maintained at the outlet of the proposed stormwater facilities.
1-1
Evenddl Pim Pn:liminary 71R-.Jure 2001
Figure 1. TIR Worksheet
I
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER
Project Owner:
U.S. Land Development Associates, Inc.
Address:
Clo: Mike Romano
Centurion Development Services ·
22617 8th Dr. SE
Bothell, WA 98021
Phone:
(425) 486-2563
Project Engineer:
Ed McCarthy, P.E.
Company:
Haozous Engineering, P.S.
Address/Phone:
14816 SE 116th Street
Renton, WA 98059
/425) 235-2707
Part 3 TYPE OF PERMIT APPLICATION
jg] Residential
jg] Grading
Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Name:
Evendell Plat
Location:
West of 160th Avenue SE and bordered by
SE 136th Street on the north.
Township: 23N
Range: 5E
Section: 14
Description:
The proposal for development includes building
75 single-family dwellings on approximately 12
acres.
Part 4 OTHER REVIEWS AND PERMITS
D DFWHPA
~ Wetlands
~ National .Pollutant Discharge Elimination
System (NPDES) Stormwater Permit
~ Forest Practices Class IV General
Part 5 SITE COMMUNITY AND DRAINAGE BASIN
Community: King County
Drainaqe Basin: Lower Cedar River Watershed; Ortina Hills subbasin
Part 6 SITE CHARACTERISTICS
D River: NIA
D Stream: N/A
D Critical Stream Reach: N/A
D Depressions/Swales: N/A
D Lake: NIA
D Steep Slopes: N/A
D Floodplain: N/A
~ Wetlands: Onsite Class 2 Wetland
D Seeps/Springs: NIA
D High Groundwater Table: N/A
D Groundwater Recharge: N/A
1-2
1.
Part 7 SOILS
Soil Type
Alderwood
Slopes
Moderate
Part 8 DEVELOPMENT LIMITATIONS
REFERENCE
Ch 6 Water Quality Requirements
Ch 5 -Flow Control
Part 9 ESC REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
. ~ Sedimentation Facilities
~ Stabilized Construction Entrance
~ Perimeter Runoff Control
~ Cover Practices
~ Construction Sequence
Part 10 SURFACE WATER SYSTEM
Erosion Potential Erosive Velocities
LIMITATION/SITE CONSTRAINT
Onsite treatment -basic standards
Level 2 R/D standards
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
~ Stabilize Exposed Surface
~ Remove and Restore Temporary ESC Facilities
~ Clean and Remove All Silt and Debris
~ Ensure Operation of Permanent Facil.ities
Basin Water Qualitv Treatment Detention
East Wetoond/Wetvault Level 2 Pond
West Biofiltration swale Level 2 Vault
Facility Related Site Design Considerations:
Reference Facility Design Consideration
1-3
I Part 11 STRUCTURAL ANALYSIS
00 Rockery> 4' High
D Berms > 6': NIA
Part 12 EASEMENTS/TRACTS
D Drainage Easement: NIA
D Access Easement: N/A
D Native Growth Protection Easement
~ Sensitive areas
00 Stormwater tracts
Part 13 SIGNATURE OF PROFESSIONAL ENGINEER
I or a civil engineer under my supervision have visited the site. Actual site conditions as observed
were incorporated into this worksheet and the attachments. To the best of my knowledge the
information provided here is accurate.
1-4
\: \. . '"',,
'\\\\:\\ \ la,_;_\ ' : 01 . .::; \. :\ \, \' .
:
::, r '
0
• • ·' g
:······ ..
..--:. .... ~
SOURCE: USGS 7.5 x 15 Minute Series -Renton, Washington
SCALE: 1 :25 000
TITLE
Figure 2. Vicinity Map
PAGE DA1la
1-6 01/03/01
~:,:;,1:a:~?'.~': q
,. .~· 'C7' ~
SCIU ~ fttT
0 200
DATE NO.
-~ -,r:::J" -C7 '··-,.I --"'1:7' -·-
lfl' ..._ ._,., ._ -~ ,r -. ':"'.".,. -c-
"'
UI
.
:::,
i:?
:::J
~ 0
u
D c::::'.J
111\
D
. 1·.··:·i
I.,
~\\
~LI
J
uJ
0~ -......,)..
• • I·
"'~-
~J
·r-.\.,
\.,1~0.L .)"~ I~ 1\...,.7f
~<"'5
iP..o [
[
'!/ [ ~ I_,"'·"' .• ,....,..,.,'<..., l
' I.I r
RE\'1SION BY
• )(
[
[
,.,r:;;-·· ..
(
.t= _. ~
.IA • 0 ] -_e
[ -A,..
(,,_, -Jr
\
\.,w../'i... l
r--, .
~ 6 ~~ ~ ">,
l
\ir"'r~N">.
·c j~ I l Uh, 2c \ "', d~
• ""-I ....,..,,., \ J } '\ [ [
[ r I,.
I[ lp
-\.../" -. ~~
Haozous Engineering
CIVIL ENGINEERING EVENDELL PL.AT
PROJECT
NO.
1-4816 SE 116TH ST, RENTON, v/A 98059
-425-235-2707 ----·i--.. ·---............. -------------------. I I
DCSIONED 11'1'1 '"" 1/08/01 SHEET
Figure 3. Drainage Basins 1-6 EJ"
DIIAMI &YI
EJM
---------
'"" 1/08/01 CX'
1.
)
SCALE: 1 :24 000
1" = 2,000'
TITl.E
PAGE
Figure 4. Soils Map
DAlE
1-7 01J!l3/01
'·
-···-.-~-~·J..,'"'" "'"'
2. Co11ditioiis anifRequiremtntsSummary .
A summary of conditions and requirements for the project are presented in this section. The
following is a summary of core and special requirements from the 1998 King County Surface
Water Design Manual:
Core Requirement 1: Discharge at the Natural Location
The natural discharge locations from the site will be maintained at the outlets of the proposed
stormwater facilities. ·
Core Requirement 2: Off-site Analysis
A Level 1 downstream drainage analysis is presented in Section 3.
Core Requirement 3: Runoff.Control .
Level 2 RID standards are required for the site.
Core Requirement 4: Conveyance System
The onsite stormwater conveyance system and offsite improvements will be designed to
convey the 25-year storm.
Core Requirement 5: Erosion/S~di1Dentation Control Plan
. ··,,-···: .
Proposed erosion/sedimentation ci:mtrol pmced~es are described in Section 8. An
erosion/sedimentation control plan (ES,CP) wiil be developed for the project during
engineering design. · · ·
Core Requirement 6: Maintenanc~ a1,11l Op~ration
The proposed systems for mana~{ng ~t~rmf~te; wiU be maintained and operated by King
County. Recommended maintenance a~tiviJie~ are provided in Section I 0.
Core Requirement 7: Bonds and J,,iabllio/
Bonds and liability requirements will be developed for the project during engineering design
(Section 9).
2-1
Evendell Plat Preliminary VR-Jwie 2001
p
,.
Core Requirement 8: Water Quality
As described in Section 5.E, basic water quality standards apply to the site. A basic wetpond
will provide water quality treatment for stormwater collected from the site's east basin. A
biofiltration swale will provide water quality treatment for stormwater collected from the
site's west basin. Alternatively, a wetvault may be used to treat stormwater collected from
the site's west basin. A small wetvault will provide water quality treatment for stormwater
collected a portion of road improvements along SE 136th Street.
Special Requirement 1: Other Adopted Area-Specific Requirements
The site is within the Cedar River Basin. Basin-wide requirements have been recommended
by the Lower Cedar River Basin and Nonpoint Action Plan that apply to the site. These
requirements are covered by the 1998 King County Surface Water Design Manual
Applications Maps.
Special Requirement 2: Delineation of 100-Year Floodplain
The site is not within a 100-year floodplain.
Special Requirement 3: Flood Protection Facilities
The project does not contain nor is it adjacent to a flood protection facility.
Special Requirement 4: Source Controls
Source controls are not proposed for the development.
Special Requirement 5: Oil Control
The proposed development does not meet the definition of a high-use site requiring oil
control.
2-2
Evoufell Plat Prelimu,ary T1R-June 2001
'.
L.
3. Offsite Analysis
The site and project area are in two separate basins. The majority of the site is in the easterly
basin. Topography in this basin slopes primarily from the northwest to the southeast towards
1601h Avenue SE. A smaller portion of the site flows the west. This includes the northwest and
southwest corners of the site, as well as a portion of proposed road improvements along SE 136th
Street. These portions of the site flow to the west towards 156th Avenue SE.
A downstream drainage analysis for the site, including drainage routes along both 160th Avenue
SE and 1561h A venue SE, is presented in this section. The drainage courses from the site were
assessed on O 1/05/01. Moderate rainfall occurred during the morning prior to the site visit. The
downstream conveyance system is described below and illustrated in Figure 5. Further
descriptions of downstream structures are summarized in Table 1.
Upstream Drainage
Drainage from an approximately 0.94-acre tributary subbasin adjacent to the site's western
boundary sheet flows onto the site's easterly basin (Figure 3). Runoff from areas north of the site
is collected in the roadside ditch along 158th Avenue SE (Location 2 in Figure 5). Runoff
collected in the ditch on the west side of I58'h Avenue SE is conveyed to the east through a 12-
inch diameter culvert (Location 1) under the cul-de-sac of 158th Avenue SE. The culvert at
Location I also conveys drainage from a section of ditch along the north side of SE 136'h Street
(Location 30). The 12-inch diameter culvert discharges to an earth-lined ditch on the site's north
boundary (Location 3, Photo 3 in Appendix A. I). Segments of the ditch show signs of minor
erosion. The northerly ditch also collects runoff from the roadside ditch on the east side of 158th
A venue SE and from properties to the north. The vegetation and dimensions of the northerly
ditch change as it proceeds from west to east (Locations 4 and 5). At the northeast corner of the
site, a ditch on the west side of 160th Avenue SE joins the system. The system subsequently jogs
around a utility box (Location 6). The ditch continues along the east boundary of the site
(Location 7). No scouring or erosion was observed in the grass-lined ditch along this segment.
The road embankment on the west side of 160th A venue SE is steep, but stable. A side channel
from the onsite wetland merges with the roadside ditch at Location 8. (Photo 4 in Appendix A. I).
A small amount of flow was observed exiting the wetland at the time of the site visit. The ditch
continues along the east boundary of the site to the site's southeast corner.
Downstream Drainage Course -1601
h Avenue SE
Upon leaving the site's southeast corner, the grass-lined ditch continues in a southerly direction
through 12-inch diameter driveway culverts (Locations 10 through 13, Photo 5 in Appendix A.I).
At a distance of about 660 feet from the site, a 12-inch diameter concrete pipe conveys drainage
to the east side of 160th A venue SE (Location 14 ). The site comprises approximately 17 percent
of the tributary basin area at this point in the drainage system. Drainage is then conveyed
through a 24-inch diameter CMP driveway culvert with a crimped end (Location 15). From
Location 15, drainage is conveyed through a short section of ditch with accumulated sediment
3-1
Evmddl 1'1111 Preliminary 11R-June 2001
(Location 16). At a distance of about 860 feet from the site, drainage flows through an 18-inch
diameter pipe at the residence of 14028 -1601h Avenue SE (Location 17). A past drainage
problem (Drainage Complaint No. 97-0423) was reported at this location. The complaint was not
available but was related to overflow from the roadside ditch (Appendix A.2).
The 18-inch diameter pipe discharges to an earth-lined section of ditch (Location 18). Minor
erosion was observed at the outlet of the 18-inch diameter pipe. At a distance of about 1,000 feet
from the site, drainage flows away 160th A venue SE to the east, among trees on a forested parcel
(Location 19). The channel is somewhat flat and braided after leaving the roadside ditch and
passes through a ponded area (Location 20), The channel then becomes more well-defined
(Location 21) and enters a 12-inch diameter pipe (Location 22) located near a horse corral.
Drainage is then conveyed through a 12-inch diameter driveway culvert (Location 23) and then to
an open channel. The open channel flows along the north boundary of residential lots that are
along SE 142"d Place. A segment of the channel has been reinforced with concrete blocks
(Location 24 ). Drainage then enters an 18-inch diameter pipe that has a trash rack and concrete
headwall inlet (Location 25). At Location 26, the channel turns to the south and has significant
. bank erosion at the bend. The site comprises approximately 9 percent of the tributary basin area
at this point in the drainage system. The channel then flows down the hill (Location 27) towards
SE 144th Street.
A past drainage problem (Drainage Complaint No. 97-0206) was reported at Location 25
(Appendix A.2). The resident at 16046 -SE 142"d Place has had problems from runoff in the
channel along his property .. The 18-inch diameter pipe has likely been installed since the
complaint was filed to reduce groundwater seepage from the ditch that was apparently
compromising the performance of the homeowner's onsite sewage treatment system. The
homeowner also stated in the complaint that he maintains the ditch long the north and east
boundaries of his property by removing accumulations of debris and sediment. King County
investigated the problem for the Neighborhood Drainage Assistance Program.
Downstream Drainage Course -1561h Avenue SE
A break in grade approximately 250 feet west of the intersection of SE 136th Street and! 58th
A venue SE divides surface water flow to the east and west. From the grade break, drainage
flows west along a shallow grass-lined ditch along the north side of SE 136th Street (Location
31 ). Road improvements end about 375 feet west of 1581h Avenue SE, at which point the
roadside ditch discharges to a grassy area in the road right-of-way (Location 31 ). There is no
distinct flow path in the road right-of-way and drainage likely reaches the ditch along 1561
h
Avenue SE by sheet or shallow flow. At the intersection of SE 136th Street (Location 33, Photo 6
in Appendix A.I), the earth-lined ditch along 156th Avenue SE flows to the south. At a distance
of about 150 feet south of SE 136th Street, drainage enters a series of Type 1 catch basins
connected by segments of ditch and 12-inch diameter pipe (Locations 34 through 52). No signs
of capacity problems were observed along the drainage route at these locations. At Locations 35
and 37, leaves and other debris have accumulated, presenting the potential for plugging
downstream sections of pipe.
3-2
Evenddl Plat Preliminary TJR-June 2001
l.
At Locations 42 and 43, drainage from SE 1381h Place enters the conveyance system. Runoff
from the southeast comer of the site sheet flows towards the backyards of homes at the end of SE
138th Place. Runoff from this area of the site eventually drains to the conveyance system along
SE 138th Place. A past drainage problem (Drainage Complaint No. 97-0107) was reported by the
resident at 15641 SE 138th Place (Appendix A.2). Based on King County's record, the complaint
was related to a change in drainage pattern due to a broken culvert at the cul-de-sac (Appendix
A.2).
AtLocations 46 and 47, drainage from SE 139th Place enters the conveyance system.
Downstream from Location 52, a grass-lined ditch conveys drainage to the south along a pasture
(Location 53). At the lower end of the pasture (Location 54) the ditch flattens and it appears that
high flow rates could flow onto a portion of the pasture. At Location 55, drainage enters a 12-
inch diameter pipe. A past drainage problem (Drainage Complaint No. 97-0318) was reported at
Location 55 by the resident at 14038 561h Avenue SE (Appendix A.2). The complaint is a claim
and was not available from King County. Based on King County's record, the complaint was
related to flooding due to a plugged culvert (Appendix A.2).
Downstream Drainage Complaints
Drainage complaints along the downstream system were investigated at King County Water and
Land Resource Division. Drainage Complaint Nos. 97-0423, 97-0206, 95-0107, and 97-0318 are
along the drainage route and are described in the narrative above. A map showing the locations
of residents that filed drainage complaints is provided in Appendix A.2. Copies ofregistered
drainage complaints are listed in Appendix A.2. A summary of the drainage complaints is
provided in Table A.I of Appendix A.2.
3-3
Evende/1 Plat Preliminary T1R-June 2001
·=~'
I,
II e.. ,~
I•® .. lll
,··-,· -··-· .... -·" .~.. ·-· .·~·'
(2)
';;1
!:
el S.P. 976093
[ e ..
(§'
i r-----1 ®
. ,, .~· ' .. ...:,,.-: _'')-.:::;:7 • .:IP 'Q.. ' ~
!
@I,, • JI se~H
Ou.n ; ---tfe""\~
nu • .~,2., -.sS.E. 135TH
• ~:e: .. . 2 --.•
'C7'
ST.: "'· ['NIU·-y.
~ "
• '• 1 • & ""' .•.• •11011 : : 0 ' -. .
'. .. i w, . " ~ I~ _i ~ s ; , ~ . .
t.,. / t 0i: • ~ " • 4 = 5 i ' • Cedar River :; ,._ (31 "" · 7 l ,-z -
r.: : '@ 9.a•.aao,.,. • ~ ;; • .,, , " · ..., Watershed
;;
t i@> @ \\V 1,)3 (u'\ fs\.o • -1311 14~ llS I I t .1 ~ 31 3 -/ I._V \...:.!..) ~-1!3 • '°'E I~= = : I!! --, "J.o'° I '-0/1' ® rii' , ... ..._~. , ~ ··· ,,. •~~.-.. hno~ ··-.) n11 ,.,.,, • • • n'1 lw.,, 5'2.!
cEl,Ps . <RENTON AVE.,, "' •S.E. 136TH ST. !-<-
"'"·~' ·~U3 I . \ .... • G". T I .... -..."'''.~ . 0i 'j," 'I T IJ ;,\3A8~ ·i 4, ~ @_
1
~ :ii <
1: G:' · ® ~: 0"\ ·: It ~ F I V E ~ ;~A CR E
11~ \ ~ ~ IV. 1 · i! Si
. (ll t . l """
ll ~,(l~ ,.P,.11) . : a•a1a.1\3 0 ~:, i , ·; , .. -(<mo> -,m _ _;.~
-•-£:Ii 0,· '';[' \ >,,""" . \ I SITE I \·® i Ii -~ I .:·,-n s'
••
0 W4~ ~ # l · t •, ! I
:11 !"'l!:f's.; :!! "~ '' "' l,.:'>\Ac. .,-·.._ : I a 2 !: • -• '
i:J -,,.-';" ""@ ,. . , · · -----+ j • S.E. 137 ~ ' ' • . j 1ir ~ • ~
-, 0) \' • ".l .... -~ . I,:;;,, . '\ 0)' . ~ I
' I I ~ r;:;;, lri, ··-· t,. G I : , ll 11 10 @ I!!, ,0 ® ® ~I"' ·. -, I ' ..... .. .. ,, ' ·""-" ·----·-"" . . " -~ I I Z ,; 4 0 & I ;--·~;-R:Q\ : I •
. l.l ' • _ · i F o 5 E _ '~ , , 0 •c\ -\'/ ® ~ _
1
I 8 T R _ ~ g T S .
~ ' " ; • ~ ... ·' , l ,\ IV , . 0 ' S E 138TH PL • ~ ~ U , p , •t, . ..,.. r -. ,;J ~ ~
-" . · 1~.~ .. & /ltlr ~.) l?"~ ~ ; ' :; ::
NOT
• • . -• " 1' f· ' \ --=•-·:::-----·::.----~-~---~·,1; 1 • ~ -
. I <' A R C E N-: -:, ,'' \' : -;;:, · ~,,e e ~ w ~ \ ·G.; ~ 1.6 15 l 14; I)' I IZ ,-II ~O. . ·-• :-!. f!1
" r_~ '. ~, ! j u. .. .,.j '5'"1."J") e • sn· "· ·"I~ (/) ,-, • ' , "t.O >.c. , , . .-. · · '\ 0..!.) (I)
. --@ @) i@ @' ®" ~ / /@) @ j, , c• ~\. , _
~{rs)\, ·.\:;; <'. ,_1i ,1''1· / 3H&I . '· ·-. "" ~l.'6l : I~ /'./~\ ~ ~
_.-". " .., --i. : ' . ' ; ·.·"\ ' -f 'i -··!::' ·~ --. _ l: .. ' . ' < ,' @ i 9:/ -@ Ft : ~ .~ --'s --, l' .. ' ----' ' '.' -\'c'.Y • !l
i,; Jo .J~.E . 13. STH'i -1T>L ~,· .. ·, .'· , ·1,, , 12, ,2. • /I 2 w· . , ~ ~ ~
7 ?! . , , --,· j, : • I r , . ~ , ; , . , : ~ • .t./ ~ w ~ .
~u,, }'i i;· ~~: 5.
1
-~~J~ iv\ ~;9f E~ ae .. ,o._.___ • A _ .. ~3 : --:1 JJ,tj, I-. "'·" : ,.,.,,, 8 ~ I ... ,
,, ,.::. ,,.·~ •. ·1 • ;-•"',··-··'8 '"'·'\o , 1,,, S1t.: 1s 17% of I &!• _ ,d'.., .-. · ,__ f , A,. .,-:.·-·, ... 1·t.rn--....., a......... ~II:! JV·-~ ~ ~ ... o · t. ~,. ,,~. i.'; .. ,,Y, J.·. :: , • ® Trihuta,·v Area i ;:; .., _ , i;-., \ : .• ~ ;::I:'.:;:::)-,'"""'='"'°""""' ,r·, --,__::_ -• -. "',.,· 'i!. ·o.c· 5 1\ ~ !!.
w . . -[HluLf It! li2\1.c:. --':! ...
M'l t g O.S5Ac. ~ ,_ ~-~ ! \.'.::) /7\. /Jq)) , ~ ~ ~ . £\ @ ·-® .• • .. ...-@ .o/ -!'.":"\\:Vi .· 'f,-r/ ( er\f' N . i.:e IL5 • -. co I ~~€\" ~.\:s-.1 . , y .. ~ ·" i.(9 8 58 A ~ ( .. i-<··· ). .· ... -I .... ..-:-..... .,(.' .. ' i,;.,, S't ·s 9°1 of v . c. • :-,-.,.,.. . , , ® I ,. , . . , ;-r-I e I · ,,Jo
f 5'-( · • ~ ® ·"'l· . ~ ·/ : 18. .. ·sic · iit, // I Tribu't.-lJt Area
.-.!!!!J
~ : < -. ' / ,I.'-,. ¢i ,',.,I'.
Ir;;\. .. ® / / ~®-~ .; / ]' "' _ .... '\ l\ l<ojf~ I.Olk. 1'4><a ;.· -~ ,~ ·-~. / · ,;t(:;\ .~, ... -~-(.,'.···:./ D --1v ;;g ... @ •• @ , · @ • n r:;;v ~. ,·'6 ., ; · •. ,....;., '.
'/Iii, ' ,~ \:!,I {j]J,.~:/!fi., ~ .... & ·~~
. , ,,,, la :,,. &s~ I::.-:::::· :c: -:lH'.\~ 9. ,Y ·· .·r:; ~. (;:;d) ·/ . . , ,, ~ I @) .,.,,@ @) .. ~ ..,. ' .·· a..! ~,. . ... . &os
/] I: -. ''"' ". .... , I, ..; I c 7 ii ~" ~ '¥'~; -~~[i)-·-1.: ., .. I .1 ,\ r 1#111; .,. >aH j I , H v · • .. ··· I ,, . . D .a: .-· n • "' i ,,' ~ ()!\ . f·,;,,, 2.82 Ac. l.46Ao. • , S.E. I•'-.. '-· n I n
I~ ;;,slu , , i' ' @ ® ® .~,t,D Pl!' ~~ •--:-t !!. . ' J-,,0.1,o JJe ISO 1r----.-.. I '!._ • IO ~ ...
. LO'.: ··.·,.: /;.; TR'A' I ~: jt{:·11,2; $ • l ''"Z~ ~ ~ tl I ~ '-~I. i!
,,i, .. J "'''. c • ". , , ~ ·-·R·' 0'' U ... "'W O ; 0 ~) !' I · -,, C R, ~ S j ' • 19 , (., . A -ll ,, ~> • ' ' , 'i , -· . 1
'--... · , .,.,-r:· .•• ...,~;""• .,. u -ct •tu. ,u~, .. , •• ·• -U::\> · ~ l:l (,DL I i! _! !_ ! t I
"II j,. 143RD ST. a_. ~ f, iui$ ' I --SJ!~t6 ltHJ 11 j -
~, -· , m •Ul . 4 I 5 -'~ 6 I "'·-... -""'. "' ,,,u .... ·-,,~, .. _ ~· ·1 o. ,· I " . , ~!~ o~ ... ; .Ii C ," , 2 R 1 · q LL, , ", 1
, Cl, (; , i ~! • .J~:\1 .. 1 JF.~:,;, 5<•>c•~a_o~ s; l'N,s1 •, :
I• ® : @ @ ~ "'"' -@ @ ® ' , ' \l I ~ ., } . -~I -=~ 2 I sf' r 080 9 • 1~ ~ GJ. · ! !iii i ',5.-11' "",,,.,. CJ ~ v P • ~~~. e I I" I @< ;fl ~c. . @ . ..~ T,'S"' _,,;; . . ___ _ ,... ~ .. _ .... .;, ~-------
--1 t= c "''· r., . : .Sn,.~, ' ;,,: . _·, •• 4 -• ~ ... ---I. T . -·-·-ST-·-'; _____ ,_,_
--~.!..:._,---,,·-'--·-·-·-·-·-·-·-·-·-·-·-·~·S.E-:-·-·y-·-144 H--· ~ ·rJ ''---------
ii
i!
-; 23 1j, t (N:L.SHULT~~. NOT O,EOEO. ..•. . _. >, • -
LEGEND ;;ii''. ,.) ·
Culvert t-t
Ditch
Catch Basin IE,
Sheet Flow
Location
ID
·~
®
lt~OZO~J lr.i'lQ!IU'.flmJ((!, IP' .1 ®
SCALE: 1" = 300'
TITl.E
Figure 5. Dowm,tream Conveyance System
PAGE OA1"
3-4 6/11/01
's::;, 137 .
Table 1. Description of Downstream Conveyance System
Site Visit on 0110510!
Basin: Easterly basin draining to 160"' Ave SE (including upstream areas) Weather: Rainr
Ili'<i:tatiinc /i .• • Diainage. < . • . • iJ)rJ1iriage . . Slope Distancefrom/ • Observatfoiis'o(Fielil' 111\ri ;, :}:;:]in;g~~rf~~· tl~~!t~i,~f, • • ... · . .. SitiI>iicharge' ; Irs;iEf £tilThi1
ll~~1%!t ~~~ffii ~:~l~t~~?: ·114 ~~~;;~D,~ t,,s~~~"iI~~!i~~1t·g,·~:~~a;~fir~i
56
58
I .
2
3
4
5
Sheet flow / Pasture ar_ea drains I 2 j "Yest boundary of
towards site site
Sheet flow
12-inch diameter CP
Length =90'
Roadside ditch
Width: 1.5'
Depth: 2'
Side slope: 2: I
North boundary ditch
Width: 1.5'
Depth: 1.5'
Side sl<>I'_e: I: I
North boundary ditch
Width: 1.5'
Depth: 3,0'
Side slope: 2: I
North boundary ditch
Width: 2,0'
Depth: 3.0'
Side slo]>_e: 2: I
Forested area I I I South portion of
HW=l'
Earth-lined ditch; east
sideofl581h Avenue
SE
Earth-lined ditch
Grass-lined ditch w/
briars
Earth-lined ditch
2
4
3
2
2
site
Northwest corner
of site
North of site
North boundary
of site
/ North boundary
of site
North boundary
of site
Minor erosion
Somewhat undulating
topography; runoff from
south boundary of site
flows south
Conveys drainage from
west ditch of 158th
Avenue SE
Collects fll)lOff from
roadside ditches along
158th Avenue SE and
areas to north of site
Collects runoff from
areas to north of site
Collects runoff from
areas to north of site
Table 1 (continued)
Basin: Easterly basin draining to 160"' Ave SE
i;jo~~iit:o . . . Drainage . · .. ·•· .J>rainage ·
[)F}?Jif -'.•'Coniporieiit Type, . . ; Compiirient rf;i~Jt Name, iifd,:c~!Ze :::·•··. ,j:;!Jf!~~r~:011 ·
'ig:;Ji; }:'ype: sheet. tl~.w; ~)Vale, ••. ' . t•.i!f*1ag~ ~!!Sin, ... ·.. .
·;,, .. stream, channel;'p1pe. yegebitton;ct9yer;depth,
f/· :; size: diairieteiLwidiJ!; ,.'/iypkofsi:nsiiive area .
6 I North boundary ditch I Dense briars
7
8
9
10
11
12
Width: 2.0'
Depth: 3.0'
Side slope: 2: 1
Roadside ditch
Width: 1.5'
Depth: 2'
Side slope: 1.5:1
Side channel from
onsite wetland
Width: 2'
Depth: 1.5'
Side slC>])e: 2: 1
Roadside ditch
Width: 1.5'
Depth: 2'
Side slope: 3:1
12-inch diameter CP
Roadside ditch
Width: 2'
Depth: 1.5'
Side slope: 3: 1
Grass-lined ditch;
west side ofl58"'
Avenue SE
Wetland
Grass-lined ditch
HW=l'
Grass-lined ditch
12-inch diameter CMP I HW=l.5'
Slope Distance from
SitfDischiifge
·,.I. .. . .;.,.,,:,\\:t 1 ·
I
I (%)
3
4
I 0.5
3
2
3
2
1• J/4ri~'.320
0
~,
. -_-.,, ...... _.,··,·,.
Northeast corner
of site
East boundary of
site
I East boundary of
site
East boundary of
site
40
60-400
400
Existing
Problems
Potential
Problems
constrictions, under capacity, ponding,
overtopping, scOuring, bank sloughing, '
sedimentation, incision, other .erosion
No scouring or
erosion; road
embankment is
stee but stable
None
None
Observations of Field.··
Inspector:· Resliui'ci"
Rt:~t:::~1:fci{ii'
tributary area,· likelih~od of;
. problcm,'overtlow'.,t.~:;:.,.,
pathways, potb1tial urtpacts'
Collects runoff from
areas to north; ditch jogs
around utility box; ditch
from west side of 160th
Avenue SE ioins in
Small amount of flow
observed
'-___/
Table 1 ( continued)
Basin: Easterly basin draining to 160" Ave SE
I~~ f ~~I~if ~l\l:t~;··&,..,. ·~::~i~t i~1·~r.t:J,p ;;;i::r&:~11 f ~;r'd
j9~;!!'ril 1~!1~1:1~1} ttl8'1i~{ . ,::ri1f.tl!!lfrit Jt,tt!!ii·;iJ!l:!i!:1~!i1 m:;;~iSi'
13 Roadside ditch Grass-lined ditch 3 420-660
Width: 2'
Depth: 1.5'
Side slope: 2: I
14 \ 12-inch diameter CP I HW=l.5' I 3
Length=40'
15 I 24-inch diameter CMP I HW=l' I 2
16
17
18
19
Length= 20'
Roadside ditch I Grass-lined ditch
Width: 2'
Depth: 1.5'
Side slope: 2: I
18-inch diameter CMP I HW=l'
Length = 80'.
Roadside ditch
Width: 3'
Depth: 3'
Side slope: 2: I
Braided channel
Earth-lined ditch
Forested
3
3
2
I
660
780
820-860
860
950-1,000
l,000-1,100
Downstream end
of culvert is
crimped
Some sediment at
culverts
Past drainage
problem reported
at this location;
See Drainage
Complaint No.
97-0423
Minor erosion at
outlet of 18-inch
diameter CMP
Culvert crosses from
west to east side ofroad
Water flows east among
trees
,-
~
Table 1 ( continued)
Basin: Easterly basin draining to 1601h Ave SE
'"'"~1~-!tB&11~~~;~~,,~~~2;:~·~:;t:~~I
21
22
23
24
25
26
.,., .·~~-· c.~·c.·nc,c.· ~,~'"''' ,.,cc,~~&i11~~!~~%:~i~:~~~~iUir 1!~1:i~bt!!=~S!iI!1 ;~~E;&wi
Channel
Width: 2.5'
Depth: I'
Side slope: 2: I
12-inch diameter CMP
12-inch diameter
culvert
Channel
Width:2.5'
Depth: 2.5'
Side slope: Vertical
24-inch diameter
culvert
Channel
Width: 3'
Depth: 4'
Side slope: I: I
Forested, potential 0.5 l,100-1,200 I Flow path through
wetland area middle of ponded area
Earth-lined I 2 I l,200-1,350
Earth-lined bottom;
concrete block walls
Earth-lined
1-2
1-2
2
3
I 1,350
I 1,450
I 1,4 70-1,600
1,600
1,660-1,700
I Water likely
backs up under
hi flows
I Potential
overtopping of
drivewa
Past drainage
problem reported
at this location;
See Drainage
Complaint No.
97-0206
Highly eroded
banks
I
Erosion likely to
continue
I Culvert passes under
horse corral
Culvert passes under
driveway
Culvert has trash rack
and concrete headwall
inlet
__ ,.-,';
Table 1 ( continued)
Basin: Easterly basin draining to 160 1• Ave SE
1t~!\rf 1i~,i ri[iijiL,ri'."!l[ilJii · :~:r~~jji~-J 11lilf1tl t~11Jiix1;: 'ti~i]~i) ;H~tii,!i~iu} 1 '.:JL~ii;it~6=i;;1J;:0~1~lrlii1
27 Channel Earth-lined 1,700-2,000 Eroded banks Erosion likely to Channel heads down hill
Width: 3' continue towards SE 144th Street
Depth: 4'
Side slope: I: l
Table 1 ( continued)
Basin: Westerly basin draining to 156th Ave SE
l:'.i~-;f ,i@;l~!l1W:~}~~rf~~~!!!!~=;i~:~,~~i't~:~:m1
1il~~i1i: .t;~rLt:tAt l~-~~.; ''.:~!::~ t '.::1{~.;u~,~i;;i~ :i;.:a~~~!i:!i.riY..r:;·: -~~~~if~
I 57 Sheet flow Forested area 2 Southwest comer I Runoff from southwest
of site comer of site sheet flows
towards SE 13 8th Place
30 I Roadside ditch.
Width: 1.5'
Depth: 1.5'
Side slope: 3: l
31 I Ditch
Width: 0.5'
Depth: 0.5'
Side slope: 3: l
32 I Sheet and/or shallow
channel
33 I Roadside ditch
Width: 2'
Depth: 3.5'
Side slope: 2: I
34 I 12-inch diameter CP
35 12-inch diameter CP
36 12-inch diameter CP
Grass-lined ditch
Shallow grass-lined
ditch
Grass area; no distinct
flow path
Earth-lined ditch
HW=l'
HW=l.5'
HW=l.5'
2
2
3
5
4
4
4
Road
improvement
along SE 136th
Street
Road
improvement
along SE 136th
Street
Road
improvement
along SE 136th
Street
0-150
150
220
310
None
Upstream end of
culvert partially
blocked with
leaves
Flows to east towards
Location I
Flows to grass area to
west in road ROW
Access to vacant lot
Table 1 ( continued)
Basin: Westerly basin draining to 156th Ave SE
J?~ '.J;~~~.'1ffle~,·~~~1~ftt~~,~,i~~i;F;;!;~~~;g
iflllitt~i!~~}'};am~~ , .. · i: jW~;!~Jil1i;tJx,~!!ili~!JE$1~;il~\~~i~1flt1
37 Roadside ditch Earth-lined ditch 5 340-470 4-6 inches of Debris has
Width: 2' leaves in bottom potential to block
Depth: 2.5' of ditch downstream
Side slope: 2: I culverts
38 \ 12-inch diameter CP I HW=l' I 4 I 470 I Upstream end of
39
40
41
42
43
44
12-inch diameter CP I HW=i.5'
crossing SE 137th
Place
Type I CB
12-inch diameter CMP
in
12-inch diameter Nl2
out
Type I CB -grate inlet
12-inch diameter Nl2
Type I CB
12-inch diameter N12
Type I CB
12-inch diameter Nl2
Type I CB
12-inch diameter N12
4
4
4
4
3
3
550
600
660
870
950
1,100
culvert partially
blocked with
leaves
Table 1 (continued)
Basin: Westerly basin draining to 156th Ave SE
~J.{o.~atj9n .·•·· .. · ... .Dtiiinage ......... ·.. <Dfai11ilge . ~lope· .. ·· Distance from Potential Obsen'litfon(~ftieft(
':f Jfi~'Iri ;.c;t~;~;i:}[fe, d;%~J!f~JI{{\ .. \ . Sit,e pisc~~rg~, . . . Probl~y:s :1~s~if~r1t11~
~t~tt~ =!¥1~~~::, ;;;2:;!f~~~ · :;,1
1~i§~;~~\~~:~;:1t:ii~~ii!:8:i~t;r:~'?i~f~li1
45 12-inch diameter CP 2 1,240 Collects runoff from SE
from east 139th Place
46 I Type I CB -grate inlet I I 3 I 1,240
47
48
49
50
51
52
53
54
12-inch diameter Nl2
in
12-inch diameter CP
out
Type I CB -grate inlet
12-inch diameter CP
from east
Type I CB -grate inlet
1,2-inch diameter Nl2
out
12-inch diameter Nl2
outlet
12-inch diameter CP
12-inch diameter CP
Roadside ditch
Width: 1.5'
Depth: 2'
Side slope: 2:l / ', r
Roadside ditch
HW= l'
HW= I'
Grass-lined ditch
Grass-lined ditch;
ditch flattens out
3
I
1,290
2 1,290
3 I 1,320
3 I 1,460
3 1,470
. 3 1,520
3 1,550-1,750
2 1,750-2,000
I I
I Half-filled with
sediment
I Collects nmoff from SE
139th Place
Water likely spreads out
onto adjacent pasture
Table 1 ( continued)
Basin: Westerly basin draining to 156 1
• Ave SE
, ])rJ!inage . > .. .'.:Draitfa.ge .· · Shipe Distance}i:o!n;
... Conip1111e~tTy~,, · _ '~opip~·nent--· . )Site])isc~iitg~{ .··
,,,Na\!!~~~~eJ>; .~;-~;~~~ie::~~-·'•·• ~~~ > · •.. ,. ;,:f~~J,f,1--./
·1 •• B;;rf'·· ,i;1~jfi~1
( ).·u
4 '1iltli1~-z' ._.1tili~iJI~~E~1--
12-inch diameter CP \ HW = l' \ 2 I 2,000 I Past drainage
problem reported
at this location;
See Drainage
Complaint No.
97-0318
~
Observ.i.dioniof•!ieJd;., . In~~~t~~~tf ~1t~l
t~l&tlfi
,.
)
!4. :Flow Control and Water Quality Facility'Analysis and Design
Part A: Existing Hydrology
The site consists of two basins. The topography of the east basin generally slopes from the
northwest to the southeast (Figure 3). The topography of the west basin generally slopes from
the east to the west. Cover types on the site include a single-family residence (Photo I in
Appendix A. I), forest (Photo 2 in Appendix A. I), and pasture. A Class 2 wetland has been
identified in the northeast portion of the site. Cover types and areas used in the stormwater
design for existing onsite conditions are summarized in Table 2.
Part B: Developed Site Hydrology
The proposal for development includes building 75 single-family dwellings on about 12 acres.
The proposed site plan is provided in Figure 6. Cover type areas for developed onsite conditions
are summarized in Table 2. Under developed conditions, the developed portion of the site,
including offsite road improvements, will consist of 4.53 acres of grass and 7.23 acres of
impervious area. Under developed conditions, stormwater from the site and road improvements
will be collected and treated onsite to basic water quality standards. Stormwater will be managed
separately in the east and west basins.
In the east basin, stormwater from the site and a portion of improvements along SE 136th Street
will be collected and managed in an onsite combined wetpond/detention pond. The outfall of the
pond will discharge to the drainage ditch along the west side of 160th Avenue SE. Stormwater
from a 0.33-acre portion of SE 1361h Street will bypass the onsite stormwater facility, but will be
treated to basic water quality standards with a small wetvault located near the intersection of SE
136th Street and 160th Avenue SE. The stormwater pond in the southeast corner of the site will
be designed using a downstream point-of-compliance to account for the bypass from SE 136th
Street.
In the west basin, stormwater from the site and a portion of improvements along SE 1361h Street
will be collected and managed in an onsite detention vault and subsequently treated by a
biofiltration swale. Stormwater from a 0.19-acre portion of SE 136th Street will bypass the onsite
storm water facility. The storm water vault in the southwest corner of the site will be designed
using a downstream point-of-compliance to account for the bypass from SE 136th Street. Runoff
from the existing impervious area of 0.16 acre on SE 136th Street will be treated onsite in lieu of
the bypass.
4-1
Evenddl Plat Pre/imfr,ary 11R-June 2001
Table 2. Existing and Developed Site Basin Conditions
Existing Conditions
Suhhasins KCRTS Till-forest Till-pasture Wetland Till-grass lmperv
Basin (AC) (AC) (AC) (AC). (AC)
East Basin exeast
Site 7.54 · 1.74 ---
SE 136th Street
Improvements -0.47 --0.09
Subtotal 7.54 2.21 --0.09
West Basin exwest
Site 0.44 1.12 ---
SE 136th Street
Improvements -0.29 0.07
Subtotal 0.44 1.41 --0.07
Grand Total 7.98 3.62 --0.16
Developed Conditions
Subhasins KCRTS Till-forest Till-pasture Wetland Till-grass Imperv ·
Basin (AC) (AC) (AC) (AC) (AC)
East Basin deveast
Lots 3.79 4.82
RID 0.16 0.66
SE 13 6th Street
Improvements -0.56
Subtotal ---3.95 6.04
West Basin devwest
Lots 0.58 0.73
RID 0.10
SE 136th Street
hnprovements -0.36
Subtotal ---0.58 1.19
Grand Total ---4.53 7.23
Note: 0.19 acre of impervious of SE 136 Street improvements bypass the RID facility in the west basin.
0.33 acre of impervious of SE 136 Street improvements bypass the RID facility in the east basin.
4-2
Total
(AC)
9.28
0.56
9.84
1.56
0.36
1.92
11.76
Total
(AC)
8.61
0.82
0.56
9.99
1.31
0.10
0.36
1.77
11.76
Part C: Performance Standards
A summary of flow control, conveyance, and water quality treatment performance standards for
the project is presented in Table 3, below.
Table 3. Summary of Performance Standards
Cateiwrv Performance Standard Source
Flow Control • Level 2 RID a 1998 King County
Surface Water Design
Manual; Applications
Map
Conveyance System a Provide conveyance for a Surface Water Design
Capacity developed 25-year storm Manual Section 1.2.4.1
Water Quality a Basic water quality treatment a Surface Water Design
Treatment Menu using a wetpond in the east Manual Section 1.2.8.1;
basin and a biofiltration swale Applications Map
or wetvault in the west basin
Source Control a None proposed
Oil Control • The site does not meet the • Surface Water Design
definition of a high-use site Manual Section 1.3.5
4-3
Evende/1 Plat Preliminary 11R -June 200 I
Part D: Flow Control System
KCRTS was used to design the proposed stormwater facilities. Procedures and design criteria
specified in the 1998 King County Surface Water Design Manual were followed for hydrologic
modeling. Descriptions of the storm water systems and details of the design analysis are provided
below. A plan view of the storm water systems is provided in Figure 6.
For stormwater facility designs, the reduced KCRTS time series data set was used for the Sea-
Tac rainfall region with a correction factor of 1.0. Documentation of the KCRTS input and
output including descriptions of executable files, reservoirs, and times series is provided in
Appendices C and D.
Under developed conditions, stormwater from the site and offsite road improvements will be
collected and treated onsite to basic water quality standards. A combined wetpond/detention
pond will be used to manage runoff in the easterly basin. A small wetvault will provide water
quality treatment to a portion of SE 136th Street that bypasses the stormwater facility. A
biofiltration swale will be used to manage runoff in the westerly basin. Level 2 RID standards
are required by the King County Flow Application Maps and recommended by Lower Cedar
River Basin and Nonpoint Action Plan. The natural discharge locations from the site will be
maintained at the outlet of the proposed stormwater facilities.
Stormwater from the development in the easterly basin will be managed with a combined
wetpond/detention facility. Stormwater from the development in the westerly basin will be
managed with a detention vault facility followed by a biofiltration swale. Level 2 RID standards
are proposed for both facilities. The stormwater facilities shown in Figure 6 meets Level 2 RID
criteria and basic water quality requirements. Flow duration curves at the downstream point-of-
compliance are provided in Figures 7 A and 7B. Peak flow rates for the downstream point-of-.
compliance, under existing and developed site conditions follow Figures 7 A and 7B. The
downstream point-of-compliance includes runoff from portions of SE 1361
h Street that bypasses
the stormwater facilities. The duration curves and peak flow rates; shown for existing and
developed conditions, indicate that Level 2 RID criteria are met. The stormwater facility in the
east basin requires approximately 117,770 cubic feet oflive storage, excluding a factor of safety,
to meet Level 2 RID standards. The stormwater facility in the east basin requires approximately
17,921 cubic feet of live storage, excluding a factor of safety, to meet Level 2 RID standards. A
factor of safety of 5 to 10 percent will be added to the final design volume.
Part E: Water Quality System
Basic water quality standards apply to the site. A basic wetpond will provide treatment for the
site's easterly basin. A small wetvault will provide treatment for a portion of road improvements
along SE 1361h Street that bypasses the easterly stormwater facility. A biofiltration swale will
provide treatment for the site's westerly basin. Alternatively, a wetvault may be used to treat
stormwater collected from the site's west basin. A treatment trade is proposed for stormwater
collected from the road improvement area along SE 136th Street in the site's westerly basin to
account for a small area of the road improvement that bypasses the westerly stormwater facility.
4-4
Evendell Plat Preliminary DR-June 2001
Runoff from an area of existing pollution generating impervious surfaces equivalent to the area
bypassed will be collected from SE 136th Street and treated onsite. ·
The required wetpool volumes for the treatment facilities were determined using equations
provided in Chapter 6 of the 1998 Surface Water Design Manual. Basin areas, annual runoff
volumes, VbNr ratios, and required volume for the wetpond are given in Table 4.
4-5
EPenddl Plat Preliminary TIR-June 2001
D
D
• '.
1.
'·
\\
•
~?.'::~._-~::.~·-.
(:.·
• I • I • I •
I
I
"' ..;-----
-/l
'deveast/
<t \ \ = ~ ___,, -~----·
.. -
3~'5G---8 ~ 9~
·-·-~~~.--;Jt~d(Yllei
4 V 11 7 Ferj!_ ,...:J,1
·s;--~_.; ~-. . i --·----r--=-v G · 11
. iiUDIDDllflifii:QDJ1a1ijl,lliif
Offsite AC ~ Area= o.94
'~
IL__l
-·~~
_J L
llf-
J -·I
_J_ _J _J
5'Wood~
I
Lot 7
Rhse
'
~
~
~
I
I .
I . SE 1Jffilf WAJIB QlWuY Yftl:H
I \ / ur« X JO'L -X 11.S'll ONSIDE DIii.) TOP OF VNJLT• ,48U
' • I . WATER SURFACE--482,.0 I ear. DEr.• 4n .D
1• -IC&SdH")rG' I DEi'. YOL-1:aD a:' . -~-=-~'!11!/.J~~-d~ 3f!!:Jf7 St;fi4~-~-~ ~:
; .. -
~· y/ r---.! , -:---
.', I --W£1lAND &
I j 4:-. 8UfITR--_ ,!l , ((0 _ -0,z~\ AC .
'~--47_) 51 i ~~n~ . ~ . _ (\)i _ \\ FQ) t -i-. J__ ~-H ./ ·J ~-"',
l::s fl· I . . · ./ . ;f/ "-\ •-f-f-'·-'-__ 43 I ~. 37 '· / )! "-
" L~ I --· -~ --· '-;,-"-'"-
-~ 1-7·1 I~! 41 ! /1 36 j 35 _/ '. o"'--. ~
Jz"-¥e'.'!1.',~~d-.J. ;:::, ,. X, 1r~
-""( -r, 1· -------....s,11
~ r -r--,-7 . ' _,,. ..
11"-=. ... • 56 I 75 i 74 i 73 "·~ '( /· : '· .. ,/ ~ I; Iii --/ I y y· -JI I-·-· ·-' "l',.1' ·.r'·-/: . ·-· I I ·i: ·...._
57 y-~/-72 j ~ 32 ..< . :
_J ( __ 1-~ i ru·---/-.:..J 30
~/ _i~ ,$~i j_ -;;·j ~~1-· .J/ .l.~
---.£---TE 1 -·-?"·i ,• / ! .
/---·-·1 · . -~e-r....-L·-·i ii7·JBACi~.=-
e1 Yeo! 89 y 68 i jii: ~mr.sii-~ . .l he! ear.-<a,i-~ :z
·--~---i I / 1-·-·-·Lt 1...,-~ur-____..._;.-,, _ _.;-·
82~-i 1· ? •, '1~ PROY •. ~ocr: :~:~ ~ -.;r-t -· '"< REQ'D WET • 31,400
/ . • • PR<N'. VOL• ~
--~--. 1B4 I 65 / --·-·1/ ,oo . s. -51'
I I /I 88.A ---
u
-,~__J
l
r-~
• I
-~ =-~-~~)(~~=;·,--..aj.=1.-3= • / '~r rr-i 7 ,li\~ ? \ ~~n~:r y ~~{J.[iif~Sfi-eef-1W "I. \\\IV r Ar. I I /111 +~
19 j :iq j 21 /'. 22 I 23 biJ I ! 26
, . I 1, ,.. I ,1 ... !
1
I::;
4~ ~
~
:::E
l,J
I-I-
-<( Ill z
_J ~:s a.
_J a::: Q.
.JI Wz LL' I-(!) 0 <-z := Ill w :::E l,J > a::: C L,.J 0
I-
Ill
u:i "' . ,..
fl. :;t •
C I
bG i [ A . -.<.,g .
J,,t ~ j .••
GI ~:..J IW iW
II) 5' I~ '~ .a =, lo [O
Z:::1 1--·-,-·-Q ' . t,Gi:;l;f !
A_,=> I
_l,a:l~8 i
i ! 1,8 i'-'
o ;,j § 1?
as_vi10:.
t:t= i~ lo
!!
~ l"l{:i!
~
t,.a
:ii
I .
1.
ui u.
~
I ' Cl> -"' 0::
;:
0
ii:
0.7 -+--Existing --s -Developed
0.6
0.5
0.4
0.3
0.2
0.1
O+------+-----t-------l-------1----"'-----l
1.00E-05 1.00E-04 1.00E-03 · 1.00E-02 1.00E-01 1.00E+OO
Probability of Exceedence
Figure 7 A-Flow Duration Curves for RID -East Basin. Duration curves are shown at the
downstream point of compliance in the easterly basin. The pond is designed to meet
Level 2 RID standards.
4-7
Predeveloped Peak Flow Rates -East Basin
Flow Frequency Analysis
Time Series File:exeast.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak -Peaks Rank Return Prob
(CFS) (CFS) Period
0.645 2 2/09/01 18:00 0.891 1 100.00 0.990
0. 200 7 1/05/02 16:00 0. 645 2 25.00 0. 960
0.517 3 2/28/03 3:00 0.517 3 10.00 0.900
0.037 8 3/24/04 19:00 0.508 4 5.00 0.800
0.303 6 1/05/05 8:00 0.457 5 3.00 0. 667
0.508 4 1/18/06 20:00 0.303 6 2.00 0.500
0. 457 5 11/24/06 4:00 0.200 7 1.30 0.231
0. 891 1 1/09/08 9:00 0.037 8 1.10 0.091
Computed Peaks 0.809 50.00 0.980
1 ..
Developed Peak Flow Rates -East Basin
Flow Frequency Analysis
Time Series File:poceast.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak -Peaks Rank Return Prob
(CFS) (CFS) Period
0. 611 2 2/09/01 19:00 1.13 1 100.00 0.990
0.177 7 1/05/02 16:00 0. 611 2 25.00 0.960
0.517 3 3/06/03 20:00 0.517 3 10.00 0.900
0.182 6 8/26/04 2:00 0. 472 4 5.00 0.800
0.173 8 1/05/05 8:00 0.214 5 3.00 0.667
0.214 5 1/19/06 2:00 0.182 6 2.00 0.500
0. 472 4 11/24/06 6:00 0 .177 7 1. 30 0.231
1.13 1 1/09/08 11: 00 0.173 8 1.10 0. 091
Computed Peaks 0.955 50.00 0.980
4-8
Evende/J Plat l'n,/iminary 11R-June 2001
b
•
0.2
_..__Existing --El -Developed
0.18
0.16
0.14 13_
if 0.12
!2.-
Cl) -..
0::
;:
0
ii:
0.1
0.08
0.06
0.04
0.02
0
1.00E-05 1.00E-04 1.00E-03 1.00E-02 1.00E-01 1.00E+OO
Probability of Exceedence
Figure 7B. Flow Duration Curves for RID -West Basin. Duration curves are shown at the
downstream point of compliance in the westerly basin. The pond is designed to meet
Level 2 RID standards.
4-9
)
Predeveloped Peak Flow Rates -West Basin
Flow Frequency Analysis
Time Series File:exwest.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak -Peaks Rank Return Prob
(CFS) (CFS) Period
0.138 2 2/09/01 18:00 0.235 1 100.00 0.990
0.059 7 1/05/02 16: 00 0.138 2 25.00 0. 960
0 .129 3 2/28/03 3:00 0.129 3 10.00 o. 900
0.024 8 8/26/04 2:00 0.122 4 5.00 0.800
0.074 6 1/05/05 8:00 0.116 5 3.00 0.667
0.122 4 1/18/06 16:00 0.074 6 2.00 0.500
0.116 5 11/24/06 4:00 0.059 7 1. 30 0~231
0.235 1 1/09/08 6:00 0.024 8 1.10 0.091
Computed Peaks 0.202 50.00 0.980
Developed Peak Flow Rates -West Basin
Flow Frequency Analysis
Time Series File:pocwest.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak -Peaks Rank Return Prob
(CFS) (CFS) Period
0.140 2 2/09/01 18:00 0.197 1 100.00 0.990
0. 059 8 1/05/02 16:00 0.140 2 25.00 0. 960
0.110 4 3/06/03 19:00 0.135 3 10.00 0.900
0.067 7 8/26/04 2:00 0.110 4 5.00 0.800
0.068 6 10/28/04 16:00 0.107 5 3.00 0.667
0.107 5 1/18/06 20:00 0. 068 6 2.00 0.500
0.135 3 11/24/06 4:00 o. 067 7 1. 30 0.231
0.197 1 1/09/08 9:00 0.059 8 1.10 0. 091
Computed Peaks 0.178 50.00 0.980
4-10
Evenddl PlatPreUminary 11R-June 2001
..
' '
'
Table 4. Wetponil Sizing Calculations
East Basin
Residential
Lots/Onsite Road 0.00 3.79 4.82 8.61 9,018 3.0
RID Tract 0.00 0.16 0.66 0.82 1,082 3.0
SE 136th Street
Improvements 0.00 0.00 0.23 0.23 353 3.0
!Total 0.001 3.95! 5.711 9.6611 10,4521
E t B . SE 136th St t I as as1n -ree t mprovemen s
5071 3.0 I SE 136th Street
Improvements 0.00 0.00 0.33 0.33
'-lT_ot_a1 ___ __,_ __ o_.oo_.! __ o_.o_o.._! ___ 0._33_..! __ o_.3__,3 j ~j __ 5_07~!
West Basin*
Residential
Lots/Onsite Road 0.00 0.58 0.73 1.31 1,368 3.0
RID Tract 0.00 0.00 0.10 0.10 154 3.0
SE 136th Street
Improvements 0.00 0.00 0.17 0.17 261 3.0
!Total o.ooj 0.581 1.001 1.581 j 1,783 j
~-~-~
Mean annual
storm= 0.47
* Either a wetvault or biofiltration swale will be used to treat water in the west basin.
4-11
27,053
3,245
1,059
31,3571
1,520 I
1,520 i
4,105
461
783
5,3491
I
, .
••
Stormwater RID System Conveyance
The onsite stormwater system will be designed to convey the 25-year peak flow rate for
conveyance systems upstream of the stormwater facility. A conceptual design of the conveyance
system is shown in Figure 6 of Section 4.
5-1
Evenddl Plat Preliminary T1R-June 20/JJ
t
i.
:..1
6; '.SpecialReports and Studies · .
A summary of special reports and studies conducted for the Evendell Plat is presented below.
Table 5. Summary of Special Reports and Studies
Study/Report
GeotechnicaVsoils
Wetlands
Evendell Plat, King County, Washington. Wetland Delineation
and Report
Floodplains
Groundwater
Anadromous fisheries impacts
Hydrology
Level I Downstream Drainage Analysis (Section 3 Evendell Plat
Preliminary Technical Information Report)
Water quality
Structural fill
Evenddl PfaJ Preliminary 11R-June 2001
6-1
Date Conducted
NIA
June 2001
NIA
NIA
NIA
January 2001
NIA
NIA
9?'Bond Quantities,7Fiicilify Summaries; and Declaration of Covenant.·
A bond quantities worksheet for the project will be prepared during final engineering for the
submittal. A summary of onsite conveyance and water quality facilities is given in Figure I 0.
None of the facilities will be privately owned or maintained. Therefore a declaration of covenant
is not needed.
9-1
EvemldJ Plat P,./uninary 77R-.June 2001
)
Figure 9. Site Improvement Bond Quantity Worksheet
'.
,.
~
.)
9-2
Evendd/ Plat Preliminary T1R-June 2001
Figure 10. Flow Control and Water Quality Facility Summary
Development: Evendell Plat Date: 6-11-01
Location: King County Township 23N, Range 5E, Section 14
ENGINEER
Name: Ed McCarthy
Firm: Haozous Engineerino, P.S.
Address:
14816 SE I 16th Street
Renton, WA 98059
Phone: ( 425) 235-2707
Developed Site: 12 Acres
Number of detention facilities on site:
1 Combined Wetpond/R/D
1 Vault
Downstream Drainae.e Basins
Lower Cedar River
Number & type of water quality facilities on site:
_l __ biofiltration swale (regular/wet/ or
continuous inflow?)
_I __ combined detention/WQ ponds
__ flow dispersion trenches
___ combined detention/wetvault
___ compost filter
__ filter strip
___ landscape management plan
DEVELOPER
Name: Mike Romano (representing U.S. Land
Develonment, Jnc.i
Firm: U.S. Land Develooment Associates. Inc.
Address:
Clo Centurion Development Services
22617 8th Dr. SE
Bothell, WA 98021
Phone: ( 425) 486-2563
Number oflots: 75 single-family residences
Number of infiltration facilities on site: 0
Immediate MaiorBasin
Orting Hills Cedar River
__ sand filter (basic or large?)
___ sand filter, linear (basic or large?)
___ sand filter vault (basic or large?)
_] __ vault
_2 __ energy dissipation structure(s)
Basic pond (basic or large?)
___ oil/water separator (baffle or coalescing plate?)
___ catch basin inserts: Manufacturer __________________ _
___ pre-settling pond
___ pre-settling structure: Manufacturer __________________ _
__ flow-splitter catch basin
DESIGN INFORMATION
Easterly Basin SE 136" Street Westerly Basin
!Easterlv Basin)
Water "ualitv Desi= Volume (CF) 31,400 5,300 Biofiltration Swale
Onsite Area (AC) 9.43 0.00 1.41
Offsite Area(AC) 0.56 0.33 0.36
Type of Storage Facility Combined Wetvault Vault
Wetoond/R/D
Reauired Live Sto=e Volume (CF) 118,000 N/A 18,000
Figure 10 ( continued)
DESIGN INFORMATION ..
Easterly Basin SE l 36~ Street Westerly Basin
(Easterlv Basin)
Predeveloped Runoff Rates
25-year (CFS)** 0.645 0.023 0.138
Post-RID Developed Runoff Rates
25-vear /CFS)** 0.611 0.069 0.140
•• Based on KCRTS I-hour peak rates for the proposed developed area.
I.
The conveyance and water quality facilities for the Evendell Plat will not be privately maintained
nor do they contain non-standard features. The table below specifies the maintenance
requirements for each component of the storm water facility being constructed. Applicable
maintenance requirements, taken from the 1998 Surface Water Design Manual, are referenced to
the pages that follow.
Table 7. Summary of Maintenance Requirements for Stormwater Facilities
Maintenance Requirement
• No. I -Detention Ponds
• No. 4 -Control Structure Restrictor
• No. 5 -Catch Basins
• No. 6 -Debris Barriers
• No. IO -Conveyance Systems
• · No. 13 -Water Quality Facilities -Wetponds
• No. 13 -Water Quality Facilities -Wetvaults
• No. 13 -Water Quality Facilities -Biofilration Swales
10-1
Evendell P/gJ Preliminary 71R-June 2001
0. 1 -DETENTION PONDS
General Trash & Debris Any trash and debris which exceed 1 cubic foot
per 1,000 square feet (this is about equal to the
amount of trash it would take to fill up one
standard size office ~arbage can). In general,
there should be no visual evidence of dumping.
Poisonous Vegetation Any poisonous or nuisance vegetation which
may constitute a hazard to County personnel or
the public.
Pollution Oil, gasoline, or other contaminants of one
gallon or more Q! any amount found that could:
1) cause damage to plant, animal, or marine life;
2) constttute a fire hazard; or 3) be flushed
downstream during rain stonns.
Unmowed Grass/ If facility is located in private residential area,
Ground Cover mowing is needed when grass exceeds 18
inches in height. In other areas, the general
policy is to make the pond site match adjacent
ground cover and terrain as long as there is no
interference with the function of the facility.
Rodent Holes Any evidence of rodent holes if facility is acting
as a dam or benn, or any evidence of water
piping through dam or berm via rodent holes.
Insects When insects such as wasps and hornets
interfere with maintenance activities.
Tree Growth Tree growth does not allow maintenance access
or interferes with maintenance activity (i.e., slope
mowing, silt removal, vactoring, or equipment
movements). If trees are not interfering with
access, leave trees alone.
Side Slopes of Pond Erosion Eroded damage over 2 inches deep where
cause of damage is still present or where there
is potential for continued erosion.
Storage Area Sediment
Pond Dikes Settlements
Emergency Rock Missing
Overflow/Spillway
Accumulated sediment that exceeds 10% of the
designed pond depth.
Any part of dike which has settled 4 inches lower
than the design elevation.
Only one layer of rock exists above native soil in
area five square feet or larger, or any exposure
of native soil at the top of out flow path of
spillway. Rip.rap on inside slopes need not be
replaced.
10-2
Trash and debris cleared from site.
No danger of poisonous vegetation
where County personnel or the
public might normally be.
(Coordination with Seattle-King
County Health Department)
No contaminants present other than
a surface film. (Coordination with
Seattle/King County Health
Department)
When mowing is needed,
grass/ground cover should be
mowed to 2 inches in height
Mowing of selected higher use
areas rather than the entire slope
may be acceptable for some
situations.
Rodents destroyed and dam or
benn repaired. (Coordination with
Seattle/King County Health
Department) ·
Insects destroyed or removed from
site.
Trees do not hinder maintenance
activities. Selectively cultivate trees
such as alders for firewood.
Slopes should be stabilized by
using appropriate erosion control
measure(s): e.g., rock
reinforcement, planting of grass,
compaction.
Sediment cleaned out to designed
pond shape and depth; pond re-
seeded if necessary to control
erosion.
Dike should be built back to the
design elevation.
Replace rocks to design standards.
). 4 -CONTROL STRUCTURE/FLOW RESTRICTOR
Structural Damage
Cleanout Gate Damaged or Missing
Orifice Plate Damaged or Missing
Obstructions
Overflow Pipe Obstructions
Manhole
Catch Basin
Structure is not securely attached to manhole wall
and outlet pipe structure should support at least
1,000 lbs. of up or down pressure.
Structure is not in upright position (allow up to
· 10% from plumb).
Connections to outlet pipe are not watertight and
show signs of rust.
Any holes-other than designed holes-in the
structure.
Cleanout gate is not watertight or is missing.
Gate cannot be moved up and down by one
maintenance person.
Chain leading to gate is missing or damaged.
Gate is rusted over 50% of its surface area.
Control device is not working properly due to
missing, out of place, or bent orifice plate.
Any trash, debris, sediment, or vegetation
blocking the plate.
Any trash or debris blocking (or having the
potential of blocking) the overflow pipe.
Structure securely attached to
wall and outlet pipe.
Structure in correct position. ·
Connections to outlet pipe are
water tight; structure repaired or
replaced and works as
designed.
Structure has no holes other
than designed holes.
Gate is watertight and works as
designed.
Gate moves up and down easily
and is watertight.
Chain is in place and works as
designed.
Gate is repaired or replaced to
meet design standards ..
Plate is in place and works as
designed.
Plate is free of all obstructions
and works as designed.
Pipe is free of all obstructions
and works as designed.
See ·c1osed Detention Systems· Standards No. 3 See ·c1osed Detention Systems'
Standards No. 3
See ·catch Basins· Standards No. 5 See 'Catch Basins~ Standards
No. 5
10-3
Structure Damage to
Frame and/or Top Slab
Cracks in Basin Walls/
Bottom
Sediment/
Misalignment
Trash or debris of more than 1/2 cubic foot which is
located immediately in front of the. catch basin
opening· or is blocking capacity of the basin by
more than 10%
Trash or debris (in the basin) that exceeds 1/3 the
depth from the bottom of basin to invert the lowest
pipe into or out of the basin.
Trash or debris in any inlet or outlet pipe blocking
more than 1/3 of its height.
Dead animals or vegetation that could generate
odors that could cause complaints or dangerous
gases (e.g., methane).
Deposits of garbage exceeding 1 cubic foot in
volume
Comer of frame extends more than 3/4 Inch past
curb face into the street (If applicable).
Top slab has holes larger than 2 square inches or
cracks wider than 1/4 inch (intent is to make sure
all material is running into basin").
Frame not sitting flush on top slab, i.e., separation
of more than 3/4 inch of the frame from the top
slab.
Cracks wider than 1/2 inch and longer than 3 feet,
any evidence of soil particles entering catch Qasin
through cracks, or maintenance person judges that
structure is unsound.
Cracks wider than 1 /2 inch and longer than 1 foot
at the joint of a"ny inlet/ outlet pipe or any evidence
of soil particles entering catch basin through
cracks.
Basin has settled more than 1 inch or has rotated
more than 2, inches out of alignment.
10-4
No Trash or debris located
immediately in front of catch
basin opening.
No trash or debris in the catch
basin.
Inlet and outlet pipes free of
trash or debris.
No dead animals or vegetation
present within the catch basin.
No condition present which
would attract or support the
breeding of Insects or rodents.
Frame is even with curb.
Top slab is free of holes and
cracks.
Frame is sitting flush on top
slab.
Basin replaced or repaired to
design standards.
No cracks more than 1/4 inch
wide at the joint of inleVoutlet
pipe.
Basin replaced or repaired to
design standards.
Catch Basin Cover
Ladder
Metal Grates
(If Applicable)
Vegetation
Pollution
Cover Not in Place
Locking Mechanism
Not Working
Cover Difficult to
Remove
ladder Rungs
Unsafe
Trash and Debris
Damaged or
Missing.
Presence of chemicals such as natural gas, oil and
gasoline.
Vegetation growing across and blocking more than
10% of the basin opening.
Vegetation growing in inleUoutlet pipe joints that is
more than six inches tall and less than six inches
apart.
Nonflammable chemicals of more than 1/2 cubic foot
per three feet of basin length.
Cover is missing or only partially in place. Any open
catch basin requires maintenance.
Mechanism cannot be opened by on maintenance
person with proper tools. Bolts into frame have less
than 1/2 inch of thread.
One maintenance person cannot remove lid after
applying 80 lbs. of lift; intent is keep cover from
sealing off access to maintenance.
Ladder is unsafe due to missing rungs, misalignment,
rust, cracks, or sharp edges.
Grate with opening wider than 7 /8 inch.
Trash and debris that is blocking more than 20% of
grate surface.
Grate missing or broken member(s) of the grate.
NO. 6 DEBRIS BARRIERS (E.G., TRASH RACKS)
11r!·i~i~:~~;?~~~,ttit tiit;; ..
Metal
Trash and Debris
Damaged/ Missing
Bars.
Trash or debris that is plugging more than 20% of
the openings in the barrier.
Bars are bent out of shape more than 3 inches.
Bars are missing or entire barrier missing.
Bars are loose and rust is causing 50% deterioration
to any part of barrier.
10-5
No flammable chemicals
present.
No vegetation blocking opening
to basin. ·
No vegetation or root growth
present.
No pollution present other than
surface film.
Catch basin cover is closed
Mechanism opens with proper
tools. ·
Cover can be removed by one
maintenance person.
Ladder meets design standards ·
and allows maintenance person
safe access.
Grate opening meets design
standards.
Grate free of trash and debris.
Grate is in place and meets
design standards.
Bars in place with no bends more
than 3/4 inch.
Bars in place according to
design.
Repair or replace barrier to
design standards.
0. 10-CONVEYANCE SYSTEMS (PIPES & DITCHES)
Vegetation
Damaged
Accumulated sediment that exceeds 20% of the
diameter of the pipe.
Vegetation that reduces free movement of water
through pipes.
Protective coating is damaged; rust is causing
more than 50% deterioration to any part of pipe.
Pipe cleaned of all sediment
and debris.
All vegetation removed so water
flows freely through pipes.
Pipe repaired or replaced.
Any dent that decreases the cross section area of Pipe rep3ired or replaced.
Open Ditches
Catch Basins
Debris Barriers
(e.g., Trash Rack)
Trash & Debris
Sediment
Vegetation
Erosion Damage to
Slopes
Rock Lining Out of
Place or Missing (If
Applicable).
pipe by more than 20%.
Trash and debris exceeds 1 cubic foot per 1,000
square feet of ditch and slopes.
Accumulated sediment that exceeds 20 % of the
design depth.
Vegetation that reduces free movement of water
through ditches.
See "PondsQ Standard No. 1
Maintenance person can see native soil beneath
the rock lining.
See "Catch Basins: Standard No. 5
See "Debris Barriers" Standard No.6
10-6
Trash and debris cleared from
ditches.
Ditch cleaned/ flushed of all
sediment and debris so that it
matches design.
Water flows freely through
ditches.
See "Ponds" Standard No. 1
Replace rocks to design
standards.
See ~catch Basins· Standard
No.5
See "Debris Barriers" Standard
No.6
'0. 13-WATER QUALITY FACILITIES
Trash and Debris
Inlet/ Outlet Pipe
Sediment
Accumulation in Pond
Bottom
Oil Sheen on Water
Erosion
Settlement of Pond
Dike/ Berm
Rock Window
Overflow Spillway
Vegetation such as grass and weeds need to be
mowed when It starts to impede aesthetics of pond.
Mowing is generally required when height exceeds
18~inches. Mowed vegetation should be removed
from areas where it could enter the pond, either
when the pond level rises, or by rainfall runoff.
Accumulation that exceeds 1 CF per 100Q..SF of
pond area.
Inlet/ Outlet pipe clogged with sediment and/ or
debris material.
Sediment accumulations in pond bottom that
exceeds the depth of sediment zone plus 6~inches,
usually the first cell. ·
Prevalent and visible oil sheen.
Erosion of the pond's side slopes and/ or scouring of
the pond bottom, that exceeds 6-inches, or where
continued erosion is prevalent.
Any part of these components that has settled 4-
inches or lower than the design elevation, or
inspector determines dike/ berm is unsound.
Rock window is dogged with sediment.
Rock is missing and soil is exposed at top of
spillway or outside slope.
10-7
Vegetation should be mowed to
4 to 5 inches in height. Trees
and bushes should be removed
where they are interfering with
pond maintenance activities.
Trash and debris removed from
pond.
No clogging or blockage in the
inlet and outlet piping.
Removal of sediment from pond
bottom.
Removal of sediment from pond
bottom.
Slopes should be stabilized by
using proper erosion control
measures, and repair methods.
Dike/ berm is repaired to
specifications.
Window is free of sediment and
debris.
Replace rocks to specifications.
'·
.~O. 13-WATER QUALITY FACILITIES
Wetvaults
Sediment
Accumulation in Vault
Damaged Pipes
Access Cover
Damaged/ Not
Working
Vault Structure
Damaged
Baffles
Access Ladder
Damage
Trash and debris accumulated in vault, pipe or
inleU outlet, (includes floatables and non-
floatables).
Sediment accumulation in vault bottom that
exceeds the depth of the sediment zone plus 6-,
inches.
JnleV outlet piping damaged or broken and in
need of repair.
Cover cannot be opened or removed, especially
by one person.
Vault: Cracks wider than 1/2-inch and any
evidence of soil particles entering the structure
through the cracks, or maintenance/ inspection
personnel determines that the vault is not
structurally -sound.
Baffles corroding, cracking, warping and/ or
showing signs of failure as determined by
maintenance/ inspection staff.
Ladder is corroded or deteriorated, not functioning
property, missing rungs, has cracks and/ or
misaligned.
10-8
Trash and debris removed from
vault.
Removal of sediment from vault.
Pipe repaired and/ or replaced.
Pipe repaired or replaced to
proper working specifications.
No cracks wider than 1/4-inch at
the joint of the inleU outlet pipe.
Vault is determined to be
structurally sound.
Repair or replace baffles to
specifications.
Ladder replaced or repaired to
specifications, and is safe to
use as determined by inspection
personnel.
• _ J• 13-WATER QUALITY FACILITIES
Biofiltration Swales
Biofiltration swale Sediment Accumulation Sediment depth exceeds 2-inches
on Grass Layer
Vegetation
Inlet Outlet Pipe
Trash and Debris
Accumulation
Erosion/ Scouring
When the· grass becomes excessively tall
(greater than 10-inches); when nuisance weeds
and other vegetation starts to take over.
Inlet/ outlet pipe clogged with sediment and/ or
debris.
Trash and debris accumulated in the bio-swale.
Where the bio-swale has eroded or scoured
the bottom due to flow channelization, or higher
flows.
10-9
No sediment deposits on grass
layer of the bio-swale, which
would impede.filtration of runoff.
Vegetation ls mowed or
nuisance vegetation is
eradicated, such that flow not
impeded. Grass should be
mowed to a height between 4
inches and 9 inches.
No clogging or blockage in the
inlet and outlet piping.
Trash and debris removed from
bioswale.
Bioswale should be re-graded
and re-seeded to specification,
to eliminate channeled flow.
Overseeded when bare spots
are evident.
I
•
'·
King County Department ofNatural Resources, 1998. King County Surface Water Design
Manual. Seattle .
King County Department ofNatural Resources, 1997. Lower Cedar River Basin and Nonpoint
Pollution Action Plan. Seattle.
King County Department of Parks, Planning, and Resources, 1990. Sensitive Areas Map Folio.
Seattle.
U.S. Department of Agriculture, Soil Conservation Service, 1973. Soil Survey of King County
Area, Washington. Seattle.
JJ-1
Evenddl Plat Preliminary 17R -June 200/
•
I .
'·
Appendix A.I Photographs of the Downstream System
Appendix A.2 Drainage Complaints
Appendix A.3 Orting Hills Subbasin Map
Evendell Plat Preliminary 11R-June 2001
».::·
··~~ .. ~
I""' ~;
V Photo Number 1
Date of Photo: 01/05/01
Location: Existing single-family residence in north
oortion of oarcel.
Description: The site currently contains one single-family
residence, shed, and lawn area.
$t ,.ti~·-
w
lJ.. I
V Photo Nwnber 2
Date of Photo: 01/05/01
Location: Northwest portion of parcel, looking south.
Description: Cover types on the site include mature forest,
pasture, lawn, wetland, and a single-family
home.
Evendell.Plat -Offsite Drainage System
V Photo Number 3
Date of Photo: I 01/05/01
Location:
Description:
Location 1 in Figure 51 looking east.
A drainage ditch flows to the east along the
north boundary of the site and turns south on
1 1 the site's east bound~1 .
tmiilfa~ "»T-:V~:l' ~ .•
V Photo Number 4
Date of Photo:
Location:
Description:
01/05/01
Location 8 in Figure 5, looking north.
The open ditch along the east boundary of the
site flows to the south along l 6oth A venue SE.
-::· .·~;~.:.:
Evendell Plat -Offsite Drainage System
V Photo Number 5 V Photo Number 6
Date of Photo: 01/05/01 Date of Photo: 01/05/01
Location: Location 11 in Figure 5, looking south. Location: Location 33 in Figure 5, looking south.
Description: After leaving the southeast comer of the site, Description: A drainage ditch flows to the south along
the ditch along 160th Avenue SE continues to 156th Avenue SE. The ditch has several
flow to the south. driveway and road culverts along its path.
41 Evendell Plat -Offsite Drainage System
Table A.I. Summary of Downstream Drainage Complaints
;Co111p_laint . Date Property Owner Description of Complaint
?'.'~~J,~~~' 1 ..
. . ·' .. ·:..··. '· .. ' .
89-0867 13802 160"' Avenue SE Drainage complaint not available.
95-0107 2/01/95 Steve Kohr Broken culvert at entrance to cul-de-sac ..
15641 SE 13 8th Place
97-0206 1/10/97 Don Gregg Offsite flows impacting private property.
16046 SE I42"d Place Backyard flooded with larger storms. Septic
system operation impacted. Investigated for V
Neighborhood Drainage Assistance Program.
97-0318 14038 56'" Avenue SE Flooding due to plugged culvert. Drainage
complaint is a claim and is not currently
available.
97-0423 14028 1601
" Avenue SE Roadside flooding -overflow of ditch along
160th A venue SE. Drainage complaint not
available.
98-0202 3/19/97 Paul Huff Drainage from neighbor impacting low area of
14312 160th Avenue SE private property. t./
Evende/J Plat Preliminary 71R-.hme 200/
,..::::·
; ' I'
-I
'
·"
' . ·:
. ' ' _, '-:. : -,
1-·I
'.1.
' '
mLE
'. '
5 Ii ' --
i.
·-)j-.
'·
•. ·1 ·•
.i .. :_J _·; L
, -r Ir;(:
·,
I -l / ~.
t'._i i
Drainage Complaints -From the Files of KCWLRD
,, ,,
; :t
f I
i" i.' r
;.
111nU eumrty Watsr and llllll HIISIIUl'C8S DMslnn -Dl'8lna!l8 Sorvlc8s Section
~Seardl Printed: 12/28100 7:36:58 AM
fl CllmldaiDI : Typaal~ Addrellall'rdd8m -lbrol 1'11118 -197,4.0095 C RIPRAP 15225 JONES RO ROCKSJOIKE/15219 JONES RD/CEDAR RIV 657A4
1974..{)()96 C RIPRAP 15224 JONES RO ROCK/DIKE/JONES RO/CEDAR RIVER 657A4
1974-0103 C 15631 JONES RD SE W/0 BACKFILUJONES RO 657A4
1974-0106 C DRNG 15005 JONES RO DITCH/ALONG CEDAR 657A4
1975-0128 C FLOG 16418 SE 145TH ST STORM SEWERS/BRIARWOOD S 65784
1976-0084 C 156TH Pl SE/JONES RD DAMAGE ALONG RD/CEDAR RIVER AREA 657A4
1976-0091 C DEBRI 15463 SE JONES RO CEDAR RIVER 657A4
1979--0090 C ORNG 14406 162ND AV SE 657B3
1980-0117 C DRNG 13405 158TH AVE SE 657A2
i. 1981-0316 C 15035 SE JONES RD DIKE JETTY/CEDAR RIVER 657M ,-,
1962-0520 C FLOG 13612 160THAVE SE 65782
1982-0521 C FLOG 16426 SE 145TH Pl BRIARWOOD AREA 65764
1983--0357 C DRNG 14827 SE JONES RD CHNL OVERFLO/MADSEN CRK 657A4
1983-0386 C DRNG 15243 SE 132ND ST DRNG DITCH/SE 132ND ST/152ND AVE SE 657A2
1983-0387 C FLOG 14063 171ST AVE SE BRIARWOOD AREA 65783
1984-0224 C FLOG 16211 SE 145TH ST 65764
1985-0710 E FILL 15035 SE JONES RO KG CTY NOT RESP•WILLnotENF 657M
1986-0372 C VIOLATE 15817 SE JONES RO MOBILE HOME IN FLOOD PLAIN 657A4
1986-0372 E ILL OVLT 15817 SE JONES RD TO BALO FOR CM(CHK STAT BY CMOT). 657A4
1986-0378 C FLOG 13129 160TH AVE SE BLOCKED DITCH 65782
1986-0437 C CULVERT 15252 SE 142ND PL INSTALLATION-NEED CB 657A3
1986-0651 C FILLING 15045 SE JONES RD SEE 86-0745, 1158 657A4
1986-0745 C FILL 15045 SE JONES RO ILLEGAL FILL.CEDAR RIVER 657M
1986-0812 C EROSION 15421 SE JONES RD CEDAR RIVER 657A4
1986-1158 C FLOG 15059 SE JONES RO SEE: 86·0745 BRAMBLETT 86-0745 657A4
1987-0430 C TRFO TO SWM-FM/RO DRNG. 65782
1987-0430 ER OH/SWM DIV PLY. 65782
1987-0430 NOA OH/SWM DIV Pl Y. 65782
1987-0496 C ORNG 16423 SE 135TH ST SEEPAGE 65782
1967-0589 C SEE 87-0430 WILSON. 65782
1987-0593 C DRNG 16904 SE 136TH ST ORNG ESMT WATER/DITCH NEEDS MAINT 65782
1987-1001 X FILL 16861 SE JONES RO ILLEGAL FILL IN FLDPLAtN 65784
1988-0377 C DRNG 14250 161ST AVE SE HAZARDOUS POND OH/TO CM. 06/10189 65783
1989-0020 C FILL 13400 168TH AVE SE NEAR DRNG CHNL 65782
1989-0086 C DRNG 14820 154TH PL SE INSTALLING DRAINAGE 657A4
1989-0863 .C ORNG 13224 168TH AVE SE DITCH CLEANING/LOSING YARD 65782
1989-0867 CL DRNG 13802 160TH AVE SE CL#12735 DUE APRIL 65782
Page 1 of 4
1lTlE
Drainage Complaints -From the Files of KCWLRD
L
I.
I
,r~;{i:ks::APP~~~~J~--.••. ~~i:>·~~iitfr~ ·.~ysfrm,P~1@~!,,r'.{~:if:,••·••:;,,,,, •'.. ·i,/·:.:,,·i.·,::•
Appendix B. 1 Stonnwater Facility Control and Overflow Design
Appendix B.2 KCRTS Pond Design
Evende/J Plat Preliminary TJR-June 2001
Evende/1 Plat Preliminary TJR-.June 2001
,·
'··
East Basin -Retention/Detention Facility
Type of Facility:
Side Slope:
Pond Bottom Length:
Pond Bottom Width:
Pond Bottom Area:
Top Area at 1 ft. FB:
Effective Storage Depth:
Stage O Elevation:
Storage Volume:
Riser Head:
Riser Diameter:
Nwnber of orifices:
Orifice # Height
(ft)
1 o.oo
2 5.50
3 5.90
Top Notch Weir:
Outflow Rating Curve:
Hyd Inflow Outflow
Detention Pond
3. 00 H: lV
167. 00 ft
58 .oo ft
9686. sq. ft
23762. sq. ft
0.546 acres
7. 50 ft
452.00 ft
115676. cu. ft
2.656 ac-ft
7. 50 ft
18.00 inches
3
Full Head
Diameter Discharge
(in) (CFS)
1.50 0 .167
2.30 0.203
2.80 0.269
None
None
Peak
Pipe
Diameter
(in)
6.0
6.0
Storage
Stage Elev (Cu-Ft) (Ac-Ft)
1 3.53 1.10 7. 60 459.60 117770. 2.704
2 1. 74 0.58 7.13 459 .13 107632. 2 .471
3 2.09 a.so 6.65 458.65 97838. 2.246
4 1. 74 0.46 6.47 458.47 94092. 2.160
5 1. 84 0.21 5. 72 457. 72 79774. 1. 831
6 1. 50 0.11 3.30 455.30 39784. o. 913
7 1. 40 0.13 4.41 456.41 568 65. 1.305
8 1. 09 0.14 5 .11 457 .11 68 64 7. 1.576
Hyd R/D Facility Tributary Reservoir POC Outflow
Outflow Inflow Inflow Target Cale
1 1.10 0.16 ******** ******* 1.13
2 0.58 0.08 ******** ******* 0.61
3 0.50 0.09 ******** ******* 0.52
4 0.46 0.08 ******** ******* 0.47
5 0.21 0.09 ******** ******* .0.21
6 0.11 0.08 ******** ******* 0.18
7 0.13 0.07 ******** ******* 0.18
8 0.14 0.05 ******** ""****** 0.17
Evende/1 Pim Preliminary 1JR-June 2001
West Basin -Retention/Detention Facility
Type of Facility:
Facility Length:
Facility Width:
Facility Area:
Effective Storage Depth:
Stage O Elevation:
Storage Volume:
Riser Head:
Riser Diameter:
Number of orifices:
Orifice # Height
(ft)
1 0.00
2 4.75
Top Notch Weir:
Length:
Weir Height:
Outflow Rating Curve:
Hyd Inflow Outflow
Detention Vault
80.00 ft
25.00 ft
2000. sq. ft
9. 00 ft
470.00 ft
18000. cu. ft
9. 00 ft
12. 00 inches
2
Full Head
Diameter Discharge
(in) (CFS)
0.70 0.040
1.30 0.094
Rectangular
3.00 in
8.90 ft
None
Peak
Pipe
Diameter
(in)
4.0
Storage
Stage Elev (Cu-Ft) (Ac-Ft)
1 0.60 0.15 8.96 478. 96
2 0.29 0.11 7. 61 4 77. 61
3 0.30 0.10 6. 91 476.91
4 0.31 0.08 6.00 476.00
5 0.35 0.09 6.07 476.07
6 0.26 0.02 3 .11 4 73 .11
7 0.31 0.02 2.40 472.40
8 0.24 0.03 3. 97 473.97
Hyd R/D Facility Tributary Reservoir
Outflow Inflow Inflow
1 0.15 0.09 ********
2 0.11 0.05 ********
3 0.10 0.05 ********
4 0.08 0.05 ********
5 0.09 0.05 ********
6 0.02 0.05 ********
7 0.02 0.06 ********
8 0.03 0.04 ********
Route Time Series through Facility
Inflow Time Series File:devwest.tsf
Outflow Time Series File:rdoutw
POC Time Series File:pocwest
Inflow/Outflow Analysis
Peak Inflow Discharge:
Peak Outflow Discharge:
Peak Reservoir Stage:
Peak Reservoir Elev:
0.595
0.146
8.96
478.96
CFS
CFS
Ft
Ft
17 921.
15219.
13815.
12009.
12133.
6214.
4797.
7942.
POC Outflow
Target Cale
******* 0. 20
******* 0.14
******* 0.13
******* 0 .11
******* 0.11
******* 0. 07
******* 0. 07
******* 0. 06
at 6:00 on Jan
at 11: 00 on Jan
Peak Reservoir Storage: 17921. Cu-Ft
o. 411 Ac-Ft
Evendell Plat Preliminary 17R-June 2001
0.411
0. 34 9
0.317
0.276
0.279
0.143
0.110
0.182
9 in
9 in
Year 8
Year 8
I
Appendix C.1 Storrnwater System Conveyance
Appendix C.2 KCRTS Time Series Calculations
Appendix C.3 KCRTS Peak Flow Rates
Evendell Plat Preliminary TJR-June 2001
Loading Time Series File:bywest.tsf
Computing Interval L6cations
Computing Flow Durations
Durations & Exceedence Probabilities to File:bywest.dur
Evende/1 Plat Preliminary 71R-June 2001
Analysis Tools Command
RETURN to Previous Menu
KCRTS Command
eXit KCRTS Program
ffl
~ • ri
~ r
r, • • ~ • • ff' .;
~
Flow Frequency Analysis
Time Series File:exeast.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
0.645 2 2/09/01 18:00
0.200 7 1/05/02 16:00
0.517 3 2/28/03 3:00
0.037 8 3/24/04 19:00
0.303 6 1/05/05 8:00
0.508 4 1/18/06 20:00
0.457 5 11/24 /06 4:00
0.891 1 1/09/08 9:00
Computed Peaks
Flow Frequency Analysis
Time Series File:exwest.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
0.138 2 2/09/01 18:00
0.059 7 1/05/02 16:00
0.129 3 2/28/03 3:00
0.024 8 8/26/04 2:00
0.074 6 1/05/05 8:00
0.122 4 1/18/06 16:00
0.116 5 11/24 /06 4:00
0.235 1 1/09/08 6:00
Computed Peaks
Flow Frequency Analysis
Time Series File:deveast.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
1. 74 6 2/09/01 2:00
1. 40 8 1/05/02 16: 00
2.09 3 2/27/03 7:00
1. 50 7 8/26/04 2:00
1. 80 5 10/28/04 16: 00 .
1. 84 4 1/18/06 16:00
2.17 2 10/26/06 0:00
3.53 1 1/09/08 6:00
Computed Peaks
Evemldl Plat Preliminary 11R-June 20()/
-----Flow Frequency Analysis-------
--Peaks Rank Return Prob
·(CFS) Period
_0.891 1 100.00
o·.645 2 25.00
0.517 3 10.00
0.508 4 5.00
0.457 5 3.00
0.303 6 2.00.
0.200 7 1.30
0.037 8 1.10
0.809 50.00
0.990
0. 960
0.900
0.800
0. 667
0.500
0.231
0.091
0.980
-----Flow Frequency Analysis-------
-Peaks Rank Return Prob
(CFS) Period
0.235 1 100.00 0.990
0.138 2 25.00 0.960
0 .129 3 10.00 0.900
0.122 4 5.00 0.800
0.116 5 3.00 0.667
0.074 6 2.00 0.500
0.059 7 1. 30 0.231
0.024 8 1.10 0.091
0.202 50.00 0.980
-----Flow Frequency Analysis-------
-Peaks Rank Return Prob
.(CFS) Period
3.53 1 100.00 0.990
2.17 2 25.00 0.960
2.09 3 10.00 0.900
1. 84 4 5.00 0.800
1.80 5 3.00 0.667
1. 74 6 2.00 0.500
1. 50 7 1.30 0.231
1. 40 8 1.10 0.091
3.08 50.00 0.980
Flow Frequency Analysis
Time Series File:devwest.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
0. 294 6 2/09/01 2:00
0.240 8 1/05/02 16:00
0.354 3 2/27/03 7:00
0 .260 7 8/26/04 2:·00
0. 313 4 10/28/04 16: 00
0.312 5 1/18/06 16:00
0.378 2 10/26/06 0:00
0.595 1 1/09/08 6:00
Computed Peaks
Flow Frequency Analysis
Time Series File:byeast.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
0.080 7 2/09/01 2:00
0.070 8 1/05/02 16: 00
0.098 3 12/08/02 18:00
0.082 6 8/26/04 2:00
0.097 4 10/28/04 16:00
0.085 5 1/18/06 16: 00
0.120 2 10/26/06 0:00
0.156 1 1/09/08 6:00
Computed Peaks
Flow Frequency Analysis
Time Series File:bywest.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
0.046 7 2/09/01 2:00
0.040 8 1/05/02 16:00
0.056 3 12/08/02 18:00
0.047 6 8/26/04 2:00
0.056 4 10/28/04 16:00
0.049 5 1/18/06 16:00
0.069 2 10/26/06 0:00
0.090 1 1/09/08 6:00
Computed Peaks
E vende/1 PUii Preliminary 11R -June 200 I
-----Flow Frequency Analysis-------
-Peaks Rank Return Prob
(CFS) Period
0.595 1 100.00 0.990
0.378 2 25.00 0. 960
0.354 3 10.00 0.900
0.313 4 5.00 0.800
0.312 5 3.00 0.667
o; 294 6 2.00 0.500
0.260 7 1.30 0.231
0.240 8 1.10 0.091
0.523 50.00 0. 980
-----Flow Frequency Analysis--~----
-Peaks Rank Return Prob
(CFS) Period
0.156 1 100.00 0.990
0.120 2 25.00 0.960
0. 098 3 10.00 0.900
0.097 4 5.00 0.800
0.085 5 3.00 0. 667
0.082 6 2.00 0.500
0.080 7 1. 30 0.231
0.070 8 1.10 0.091
0.144 50.00 0.980
-----Flow Frequency Analysis-------
-Peaks Rank Return Prob
(CFS) Period
0.090 1 100.00 0.990
0.069 2 25.00 o. 960
0.056 3 10.00 0. 900
0.056 4 5.00 0.800
0.049 . 5 3.00 0. 667
0. 047 6 2.00 0.500
0.046 7 1.30 0.231
0.040 8 1.10 0.091
0.083 50.00 0. 980
~
&
p
p
Flow Frequency Analysis • Time Series File:poceast.tsf
Project Location:Sea-Tac ..
D ---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
0. 611 2 2/09/01 19:00
0.177 7 1/05/02 16:00
0.517 3 3/06/03 20:00
0.182 6 8/26/04 2:00
p 0.173 8 1/05/05 8:00
0.214 5 1/19/06 2:00
0.472 4 11/24/06 6:.00
1.13 1 1/09/08 11:00
I
Computed Peaks
Flow Frequency Analysis
Time Series File:pocwest.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
0.140 2 2/09/01 18:00
0.059 8 1/05/02 16:00
'· 0.110 4 3/06/03 19:00
0. 067 7 8/26/04 2:00
0.068 6 10/28/04 16:00
0.107 5 1/18/06 20:00
'· 0.135 3 11/24/06 4:00
0.197 1 1/09/08 9:00
Computed Peaks
Evendell Plat Preliminary TJR-June 2001
-----Flow Frequency Analysis-------
--Peaks Rank Return Prob
(CFS) Period
1.13 1 100.00
0.611 2 25.00
0.517 3 10.00
0.472 4 5.00
0.214 5 3.00
0.182 6 2.00
0.177 7 1.30
0.173 8 1.10
0.955 50.00
0.990
0. 960
0.900
0.800
0. 667
0.500
0.231
0.091
0.980
-----Flow Frequency Analysis~------
-Peaks Rank Return Prob
(CFS) Period
0.197 1 100.00 0 .. 990
0.140 2 25.00 0.960
0.135 3 10.00 0.900
0.110 4 5.00 0.800
0.107 5 3.00 0.667
0.068 6 2.00 0.500
0 .067 7 1. 30 0.231
0.059 8 1.10 0. 091
0 .178 50.00 0.980
b
• ;,/ .::i{%:i>Pl!i4!i.:i.t')!r4i!!i!~giffil9.~~Lifii~#m:~i:ft?:ti~i,i\S·?;?l::.}> :/\\'i·ffi\Q;;fi!CfiL;,;;e;:·:;)f:t
•
The following is a description of KCRTS input and output files used
in designing the R/D facilities and conducting the downstream drainage
analysis for the Evendell Plat.
EXECUTABLE FILES
basins.exc:
This executable file creates time series for all contributing areas to
P the downstream system.
tar.exc:
This executable creates target duration files for RID design.
b.
TIME SERIES FILES
D R/D Design
D
• •
D
p
exeast.tsf:
The site's easterly basin under existing conditions. Includes area of
proposed road improvements along SE 136th Street.
exwest.tsf:
The site's westerly basin under existing conditions. Includes area of
proposed road improvements along SE 136th Street.
byeast.tsf:
The portion of proposed road improvements along SE 136th Street in the
easterly basin that bypasses the stormwater facility.
bywest.tsf:
The portion of proposed road improvements along SE 136th Street .in the
westerly basin that bypasses the stormwater facility.
deveast.tsf:
The site's easterly basin under proposed developed conditions.
• Includes area of proposed road improvements along SE 136th Street.
D
devwest.tsf:
The site's westerly basin under proposed developed conditions.
Includes area of proposed road improvements along SE 136th Street.
poceast.tsf:
Time series for developed conditions at the site's easterly downstream
point-of-compliance.
pocwest.tsf:
Time series for developed conditions at the site's westerly downstream
point-of-compliance.
Evendell Plat Preliminary 11R-June 2001
tare.tsf:
Target duration
easterly basin.
tarw.tsf:
Target duration
westerly basin.
RESERVOIRS
rdeas.rdf:
curve for the
Based on the
curve for the
Based on the
proposed R/D system ~or the site's
following times series: exeast.tsf.
proposed R/D system for the site's
following times series: exwest. ts f.
The Evendell Plat R/D facility managing stormwater from the easterly
basin of the developed site, including an offsite road improvements.
rdwes.rdf:
The Evendell Plat R/D facility managing stormwater from the westerly
basin of the developed site, including an offsite road improvements.
GENERAL NOTES
1. Seatac regional rainfall runoff files with a scale factor of 1.0
were used in the hydrologic simulations.
'.1. R/D facilities were designed with the 8-year data set. 1-hour peak
flow rates were used for detention calculations.
3. 15-minute peak flow rates were used for conveyance calculations.
4. Gravel areas were modeled in KCRTS by assuming that 50 percent of
the area is impervious and the remaining .50 percent are the same
cover type as that surrounding the gravel area.
EvendeU PlatPrelimintuy T1R-JWJe 2001
~ r
fF:
~
01
(IF
tfll: r
~ ~
~
~
~
~
~
"<il
'Ii
JEvendell Plat
Level 3 Downstream Drainage Analysis
!EXPIRES:
Submitted 10:
King County DOES
900 O.akesdale A venue S. W.
Renton, WA 98055
Prepared by:
Haozous Engineering, P.S.
9957 !71~ Avenue SE
Renton, WA 98059
Tel. (425) 235-2707
Fa, (425) 254-0579
August 26, 2002
-1
,, " /ff ,,, fJ I " " " r I n g ,
9957 171u Avenue SE
Jax (425) 254-0579 _
August 26. 2002
Mr. Michael Romano
Renton, WA 98059
(425) 235-2707,
Centurion Development Services
22617 8th Drive SE
Bothell, WA 98021
Re: Evendell Plat -Level 3 Downstream Drainage Analysis
DOES File No.
Dear Mr. Romano:
§>. s.
This letter report documents the methods and results of a Level 3 Downstream Drainage
Analysis requested by DDES for the Evendell Plat. Separate analyses were conducted for
the two drainage courses from the Evendell site.
Project Description
The Evendell Plat is a proposed residential development located within the Renton
Highlands area of unincorporated King County (Figure l ). The proposal for development
includes building single-family dwellings on approximately 12 acres (Haozous
Engineering, June 2001)-Road improvements along SE l36'h Street are also proposed.
Level 2 RID standards are being proposed for the onsite stormwater facility as is required
by the King County Flow Application Maps and recommended by Lower Cedar River
Basin and Nonpoint Action Plan.
Site Description
The site is located within the Orting Hills subbasin of the Cedar River watershed (King
County Department ofNatural Resources, 1999). The site is located east of 156 1h Avenue
SE and is bordered by SE 1361h Street on the north and by 1601h A venue SE on the east.
Cover types on the site include a single-family residence, pasture, and forest. A Class 2
wetland has been identified in' the northeast portion of the site.
The site consists of two basins with most of the project area draining to the easterly basin.
The easterly basin drains to a conveyance system along 1601h A venue SE. The westerly
basin drains to a conveyance system along 1561h Avenue SE. Both downstream drainage
courses eventually discharge to an unclassified tributary of the Cedar River (King County
Department of Parks, Planning, and Resources, 1990).
Drainage Complaints
Drainage complaints along the downstream systems were investigated at King County
Water and Land Resource Division as part of the Level l Downstream Drainage Analysis
submitted with the project's preliminary technical information report (TIR)(Haozous
Engineering, June 2001 ). Since the preliminary TIR was prepared, neighborhood
comment fonns, collected by C.A.R.E., have been reviewed for information about
drainage-related problems in the basins. Ofparticular note, flooding from the ditch on
the east boundary of the Evendell site has been observed by Mr. Bret Bowden, a resident
at 13814 160th A veriue SE. When flooding occurs, water crosses the road and flows onto
Mr. Bowden's property. Mr. Don Gregg, a resident at 16046 SE 142"d Place, has also
observed portions of 160th Avenue SE inundated by flooding during the past 5 years.
Methodology
A hydraulic analysis was conducted for conveyance systems along both 160th A venue SE
and 1561h Avenue SE. The conveyance system along 1601h Avenue SE was evaluated
from the east boundary of the site for a distance of 2,300 feet. The conveyance system
along 156th A venue SE was evaluated from a location due west of the site for a distance
of 1,900 feet. Both systems consist of driveway culverts, pipe segments, and open
channel.
The model Stormshed™ was used to predict runoff rates from contributing basins and to
model the hydraulics of the conveyance systems. Stormshed™ is widely applied in
similar projects and has been adopted by Washington State Department of Transportation
for assessing and designing highway conveyance systems.
A field survey of the downstream systems was conducted by a licensed surveyor. Ditch
cross sections, pipe inverts, catch basin rims, and road surface elevations were surveyed
to obtain data for the Stormshed™ hydraulic model. A summary of each structure
surveyed is provided in Table l.
Basin boundaries contributing to the conveyance system were based on aerial topography
and the Cedar River Basin Plan. The basin boundaries were field-verified and divided
into subbasins contributing to various branches of the conveyance system (Figure 2). The
easterly basin was divided into seven subbasins (el -e7), ranging from I .I to 33.9 acres
in size (Table 2). The westerly basin was divided into eight subbasins ( w 1 -w8), ranging
from 1.2 to 16.3 acres in size.
Cover types and land uses in the subbasins were based on a 1990 aerial photograph and
updated for recent development by conducting a field reconnaissance. The basins consist
of mostly single-family residential land use with housing densities ranging from about J
to 6 dwelling units per acre. Land uses and cover types are shown in Figure 3. The east
basin was estimated to have a total of 124.4 acres, with 35.6 acres in forest, 20.2 in
2
pasture, and 68. 7 acres in single-family residential land use (Table 3). The west basin
was estimated to have a total of 48.3 acres, with 6.5 acres in forest, 7 .0 in pasture, and
33.4 acres in single-family residential la'nd use, and I .4 acres occupied by a church.
Based on King County Soil Survey (U.S. Department of Agriculture, 1973) soil types in
the basins consist of Alderwood soils. ·
The Santa Barbara Urban Hydrograph (SBUH) model was used to model the runoff from
each of the subbasins contributing to the conveyance systems. Curve numbers for the
subbasins were based on the weighted averages of the various land uses in the watershed
(Table 4). Hydro graphs for the 2-, I 0-, 25-, 50-, and I 00-year storms were routed through
the Stormshed™ hydraulic model of the conveyance systems to determine flooding
locations and their approximate return periods. The Evendell site and other contributing
areas in the basins were modeled under their existing land use conditions.
Travel paths for each subbasin were based on aerial topography. The type of flow, flow
length, and slope used to calculate time-of-concentrations are summarized in Table 5.
Rainfall amounts of2.0, 3.0, 3.5, 3.75, and 4.0 inches were used for the 2-, JO-, 25-, 50-,
and JOO-year storms design storms in the SBUH model.
Modeling Results
Details of each subbasin modeled in Stormshed are presented in Appendix A. I for the
easterly basin and in Appendix A.2 for the westerly basin. Model results for routing the
design storm hydrographs through the drainage networks are presented in Tables B. I
through B.12 of Appendix B. Table 6 presents a summary of flow rates at key locations
in each of the conveyance systems.
A summary of predicted flooding, for all surveyed structures, including open channels, is
provided in Table B.6 for the easterly basin and in Table B.12 for the westerly basin. The
locations and return periods of flooding related to pipes and culverts are identified in
Figure 4.
Many of the driveway culverts and pipes along 160th A venue SE flood at a return period
of2-years (Table B.6 and Figure 4). Several reaches of ditch also overtop at this return
period, likely as a result of constrictions in the pipe capacities. Modeling results are
consistent with drainage complaints from residents along this reach of the drainage
course.
Similar modeling results were obtained for the westerly drainage course, where several
culverts and catch basins were predicted to overtop at 2-year or I 0-year return periods
(Table B.12 and Figure 4).
Conclusions
Several flooding locations with return periods of 2°years were identified in the
downstream conveyance systems. Flooding in the east basin that overtops and inundates
1601h Avenue SE is considered a severe road flooding problem by the King County
3
. ·l
Surface Water Drainage Manual. Residential structures have been flooded at 14028 160th
Avenue SE and at 16046 SE 142nd Place. If the finished space or the electrical/heating
components of these residential structures were flooded in the past, the flooding would be
classified as a severe problem. Otherwise, flooding that occurs at these residences is
considered a nuisance problem. Channel erosion observed along the east boundary of the
nd . property at 16046 SE 142 Place, downstream from Pipe P-110, has been a persistent
problem over the past several years and would likely be considered a severe erosion
problem. Continued bank erosion is likely at this location, with potential for reducing the
capacity of channel sections further downstream where sediment is deposited. The
flooding that occurs at the adjacent residence is likely related to the reduction in channel
capacity due to sediment deposition from the eroded banks.
Based on modeling results and information available, flooding problems in the westerly
basin would likely be classified as nuisance problems by the King County Surface Water
Drainage Ma,mal (1998). We found no documentation indicating that 1561h Avenue SE
or residential structures along the westerly drainage course have flooded in the past.
However, a drainage complaint (Complaint No. 97-0318) related to flooding due to a
plugged culvert, was not available for review (Haozous Engineering, June 2001).
Proposed Mitigations
Level 2 RID standards are currently being proposed for new development in the westerly
basin of the Evendell Plat. No additional flow control or other mitigations are therefore
required in this basin to reduce project impacts to nuisance flooding problems.
Level 2 RID standards are also currently being proposed for new development in the
easterly basin of the Evendell Plat. With severe flooding and severe erosion problems
located in the downstream drainage course, additional measures to mitigate drainage
impacts could be required. For the severe road flooding problem along 1601h Avenue SE
either of the following mitigations could be required:
• Providing Level 3 detention in the easterly basin, OR
• Upgrading the downstream conveyance system along 1601h Avenue SE to eliminate
road flooding. This would likely entail replacing driveway culverts P-117 and P-
116 on the west side of 1601h Avenue SE, cross culvert P-115, and pipes P-114
and P-113 on the east side of 1601h Avenue SE (Figure 4).
For the severe erosion problem along the east boundary of the property at 16046 SE 142""
Place, the Level 2 RID standards provide the mitigation required by code. Other types of
mitigations to reduce erosion at this location, such as bank stabilization in the eroded
section of channel or Level 3 RID standards, can be imposed through the King County
Surface Water Drainage Manual under certain circumstances. It is our opinion that either
stabilizing the eroding section of channel or the use of Level 3 RID standards would
mitigate project-related drainage impacts that occur at this location.
4
. ·I
If you have questions regarding these analyses or need additional documentation, please
do not hesitate to call me.
Sincerely,
Edward McCarthy, Ph.D. P.E.
Hydrologist
5
, .. ,
References
Haozous Engineering, June 15, 2001. Evendell Plat -Preliminary Technical Information
Report. Renton, Wash. ·
King County Department ofNatural Resources, 1998. King County Surface Water
Design Manual. Seattle.
King County Department of Natural Resources, 1997. Lower Cedar River Basin and
Nonpoint Pollution Action Plan. Seattle.
King County Department of Parks, Planning, and Resources, 1990. Sensitive Areas Map
Folio. Seattle.
U.S. Department of Agriculture, Soil Conservation Service, 1973. Soil Survey of King
County Area, Washington. Seattle.
6
. ·I
Table 1 (continued)
Reach ID Reach Pipe Dia. Manning's Length UpstrlE Dwnst IE Slope
Type (IN) n . (FT) (FT) (Ff) (O/o)
West Basin
P-001 Circular 12 0.013 113 378.62 372.66 5.27
D-001 X-Section 0.035 3 379.22 378.62 20.00
D-002 X-Section 0.035 114 381.68 379.22 2.16
D-003 X-Section 0.035 153 388.9 381.68 4.72
D-004 X-Section 0.035 157 397.4 388.9 5.41
D-005 X-Section 0.035 2 396.77 397.4 -31.50
P-002 Circular 12 0.013 25 397.51 396.77 2.96
D-006 X-Section 0.035 3 398.49 397.51 32.67
D-007 X-Section 0.035 35 399.58 398.49 3.11
P-003 Circular 12 0.013 19 400.17 399.58 3.11
D-008 X-Section 0.035 2 400.4 400.17 11.50
D-009 X-Section 0.035 36 400.91 400.4 1.42
P-004 Circular 12 0.013 59 403.71 400.91 4.75
P-005 Circular 12 0.013 9 404.21 403.51 7.78
P-006 Circular 12 0.013 42 406.09 404.26 4.36
P-007 Circular 12 0.013 150 411.17 406.34 3.22
P-008 Circular 12 0.013 157 417.58 411.77 3.70
P-008A Circular 12 0.013 28 418.1 417.58 1.86
P-009 Circular 12 0.013 142 427.25 420.75 4.58
P-010 Circular 12 0.013 86 431.9 427.35 5.29
P-011 Circular 12 0.013 62 434.34 432 3.77
P-012 Circular 12 0.013 33 435.68 434.39 3.91
D-010 X-Section 0.035 3 436.07 435.68 13.00
D-011 X-Section 0.035 48 438.87 436.07 5.83
D-012 X-Section 0.035 53 442.78 438.87 7.38
P-013 Circular 12 0.013 19 444.46 442.78 8.84
D-014 X-Section 0.035 3 444.63 444.46 5.67
D-015 X-Section 0.035 43 446.52 444.63 4.40
P-014 Circular 12 0.013 23 447.67 446.52 5.00
D-016 X-Section 0.035 3 448.08 447.67 13.67
D-017 X-Section 0.035 57 450.3 448.08 3.89
P-015 Circular 12 0.013 22 451.33 450.3 4.68
D-018 X-Section 0.035 3 451.83 451.33 16.67
D-019 X-Section 0.035 52 454.6 451.83 5.33
P-016 Circular 12 0.013 34 457.55 454.6 8.68
D-020 X-Section 0.035 3 457.71 457.55 5.33
D-021 X-Section 0.035 107 465.05 457.71 6.86
Table 2. Summary of Existing Basin Cover Types by Subbasin
Curve
Number=
Subbasin
East Basin
. el
e2
e3
e4
e5
e6
e7
Site -East
Subtotal
West Basin
wl
w2
w3
w4
w5
w6
w7
w8
Site -
West
Subtotal
81 0 85 0
Till-forest Till-pasture
(AC} (AC}
-5.8
6.0 5.2
-1.7
--
4.0 1.8
14.9 3.5
1.8 -
8.9 2.2
35.6 20.2
--
-0.7
--
--
--
0.8 -
1.6 -
3.8 4.9
0.4 1.4
6.6 7.0
98 0 86 0 98 0
Cover Type
Wetland Till-grass Imperv
(,4C) (AC) (,4C)
12.0 1.9
15.6 7.0
0.7 0.1
0.9 0.2
12.3 5.4
9.8 2.3
--
0.4 -O.l
0.4 51.4 16.9
2.3 0.6
13.8 1.8
1.0 0.2
2.7 0.5
1.8 0.4
1.8 1.3
3.8 2.4
0.4 0.0
--0.1
-27.6 7.2
Total
(AC)
19.7
33.9
2.4
I.I
23.5
30.4
1.8
11.6
124.5
2.9
16.3
1.2
3.2
2.2
3.8
7.8
9.1
1.9
48.4
.·l
Table 4. Curve Numbers for Subbasius
Subbasin Pervious Pervious Jmperv
CN (AC} (,4C)
East Basin
el 85.7 17.8 1.9
e2 84.7 26.9 7.0
e3 85.3 2.3 0.1
e4 86.0 .0.9 0.2
e5 84.8 18.1 5.4
e6 83.2 28.1 2.3
e7 81.0 1.8 -
Site -East 81.8 I I.I 0.5
West Basin
wl 86.0 2.3 0.6
w2 86.0 14.5 1.8
w3 86.0 1.0 0.2
w4 86.0 2.7 0.5
w5 86.0 1.8 0.4
w6 84.5 2.5 1.3
w7 84.5 5.4 2.4
w8 83.4 9.0 0.0
Site -
West 84.0 1.8 0.1
.·1
Table 5. Travel Path Distances and Slopes for Pervious Land Areas
Sheet Flow Delta Shallow Flow Delta Channel Flow . Delta
Subbasin Distance Elev. Slope Distance Elev. Slope Distance Elev. Slope
(FI) (FI) (FT/Fl) (Fl) (Fl) (FT/Fl) (Fl) (FI) (FT/Fl)
East Basin
el 300.0 5.0 0.017 1,484.0 20.0 0.013 950.0 10.0 0.011
e2 300.0 5.0 0.017 922.0 15.0 0.016 1,824.0 18.0 0.010
e3 300.0 5.0 0.017 264.0 3.0 0.011 106.0 3.0 0.028
. e4 300.0 5.0 0.017 200.0 4.0 0.020
e5 300.0 8.0 0.027 1,248.0 23.0 0.018 705.0 10.0 0.014
e6 300.0 3.0 0.010 1,777.0 35.0. 0.020
e7 300.0 3.0 0.010
Site -East 300.0 3.0 0.010 876.0 13.0 0.015
West Basin
wl 2,610.0 70.0 .0.027
w2 300.0 5.0 0.017 585.0 70.0 0.120
w3 300.0 32.0 0.107 272.0 13.0 0.048
w4 300.0 10.0 0.033 292.0 22.0 0.075
w5 300.0 30.0 0.100 322.0 22.0 0.068
w6 300.0 2.0 0.007 613.0 40.0 0.065
w7 300.0 20.0 0.067 655.0 40.0 0.061
w8 300.0 20.0 0.067 1,020.0 70.0 0.069
Site -
West 210.0 10.0 0.048
....
..:..
Table 3. Summary of Land Uses by Subbasin
Subbasin
East Basin
el
e2
e3
e4
e5
e6
e7
Site -East
Total
West Basin
wl
w2
w3
w4
w5
w6
w7
w8
Site -West
Total
% Grass
% lm_JJ_erv
Forest Pasture
(AC) (,4C)
-5.8
6.0 5.2
-l.7
--
4.0 1.8
14.9 3.5
1.8 -
8.9 2.2
35.6 . 20.2
--
-0.7
--
--
--
0.8 -
1.6 . -
3.8 4.9
0.4 1.4
6.5 7.0
92.5%
7.5%
SFJ
(AC)
4.5
2.1
0.8
-
-
4.7
-
0.1
12.1
-
14.5
-
-
-
-
0.6
0.4
0.1
15.6
83.5%
16.5%
SF2
(AC)
9.5
6.7
-
l. l
7.9
4.5
-
29.8
2.6
-
1.2
3.2
2.2
-
-
-
9.2
58.4%
41.6%
SF6
(AC)
-
13.8
-
-
9.8
2.8
-
26.4
-
-
-
-
-
3.0
5.6
-
8.6
0.0%
100.0%
Wetland
(AC)
0.4
Notes: SF!= Single-family residential with I DU/Ac; SF2 = 2 DU/Ac; SF6 = 6 DU/Ac
36.0%
64.0%
Church
(AC)
-
-
-
-
-
-
-
-
0.3
1.1
-
-
-
-
-
-
1.4
.
Total
(AC)
19.7
33.9
2.4
I. I
23.5
30.4 .
1.8
11.6
124.4
2.9
16.3
1.2
3.2
2.2
3.8
7.8
9.1
1.9
48.3
Table 1. Sumary of Surveyed Structures in Downstream System
,
Reach JD Reach Pipe Dia. Manning's Length Upstr IE Dwnst IE Slope.
Type (IN) n (FT) (FT) (FT) (%)
East Basin
D-110 X-Scction 0.035 48 408.54 407.59 1.99
D-111 X-Scction 0.035 58 409.57 408.54 1.78
D-112 X-Section 0.035 20 411.25 409.57 8.57
D-113 X-Section 0.035 12 411.86 411.25 5.28
D-114 X-Section 0.035 48 412.96 411.86 2.31
P-110 Circular 24 0.010 60 413.6 412.96 1.06
D-115 X-Section 0.035 3 414.27 413.6 25.24
D-116 X-Scction 0.035 33 415.1 414.27 2.48
D-117 X-Section 0.035 24 415.34 415.l 1.01
. D~ll8 X-Section 0.035 25 417.07 415.34 7.01
D-119 X-Section 0.035 48 419.77 417.07 5.61
D-120 X-Section 0.035 79 420.05 419.77 0.35
P-111 Circular 18 0.013 29 419.3 420.05 -2.56
D-121 X-Section 0.035 6 421.94 419.3 45.68
D-122 X-Scction 0.035 24 422.17 421.94 0.96
P-112 Circular 12 0.013 85 423.42 422.17 1.47
D-123 X-Section 0.035 43 424.16 423.42 J.73
D-124 X-Scction 0.065 90 424.6 424.16 0.49
D-125 X-Section 0.065 107 426.13 424.6 1.43.
D-126 X-Section 0.065 48 428.17 426.13 4.27
D-127 X-Section 0.035 79 429.74 428.17 1.99
D-128 X-Section 0.035 56 431.36 429.74 2.87
P-113 Circular 18 0.01 124 434.95 431.36 2.91
D-129 X-Section 0.035 12 434.81 434.95 -1.21
D-130 X-Section 0.035 61 436.28 434.81 2.40
D-131 X-Section 0.035 66 439.1 436.28 4.30
P-114 Circular 24 0.024 21 439.59 439.1 2.37
D-132 X-Section 0.035 JO 440.26 439.59 7.02
P-115 Circular 12 0.013 45 441.31 439.59 3.78
D-133 X-Scction 0.035 2 441. 15 441.31 -7.30
D-133A X-Section 0.035 35 442.14 441.15 2.80
D-134 X-Section 0.035 50 443.4 442.14 2.53
D-135 X-Section 0.035 106 444.67 443.4 1.20
0-136 X-Section 0.035 54 445.89 444.67 2.25
P-116 Circular 18 0.024 28 446.34 445.89 I.62
D-137 X-Section 0.035 3 . 446.6 446.34 10.15
0-138 X-Section 0.035 88 448.4 446.6 2.04
D-139 . X-Section 0.035 106 451.13 448.4 2.58
D-140 X-Section 0.035 55 452.3 451.13 2.15
P-117 Circular 12 0.013 18 452.9 452.3 3.39
D-141 X-Section 0.035 3 452.65 452.9 -9.42
D-142 X-Section 0.035 102 454.76 452.65 2.07
D-143 X-Section 0.035 160 459.46 454.76 2.93
D-144 X-Section 0.035 103 462.79 459.46 3.24
D-145 X-Section 0.035 !00 466.72 462.79 3.92
'
Table 6 Peak Flow Rates at Selected Locations . . .
Storm Return Period
Location 2-Year JO-year 25-Year 50-Year JOO-Year
(CFS) (CFS) (CFS) (CFS) (CFS)
East Basin
P-110 12.0 24.5 31.6 3.5.3 38.9
P-111 12.1 24.9 32.0 35.6 39.4
P-112 9.9 20.0 25.5 28.3 31.2
P-113 10.2 20.3 25.9 28.7 31.6
P-114 10.2 20:4 25.9 28.8 31.7
P-115 7.4 15.2 19.4 21.6 23.8
P-116 7.3 14.9 19.1 21.2 23.4
West Basin
P-001 6.8 13.7 17.5 19.4 21.2
P-002 6.2 12.2 15.4 17.0 18.6
P-006 4.8 9.6 12.2 13.5 14.7
P-008A 4.1 8.4 10.8 . 11.9 13.1
P-009 3.8 7.7 9.8 10.9 11.9
P-013 3.2 6.7 8.5 9.4 10.4
P-015 3.0 6.2 8.0 8.8 9.7
P-016 2.8 5.7 7.3 8.1 8.9
Note: Flow rates are those predicted by Stormshed using the SBUH method.
.·l
::,
0
• 0
C
.. ~ :~
!:
. ·eta_~)\,
J). ·, \
o• 167 ~
SOURCE: USGS 7.5 x 15 Minute Series -Renton, Washington
SCALE: 1 :25 000
Tlll.E
PAGE
Figure 1. Vicinity Map
DATE
1-5 01/03/01
,uu ~DO
..• :. 4 1 .,.do· ·#-ifij
SCALC IN rtET
,. ) --
,---"" \"" ,: I , .J .
] \ ..•
I
11
i
\\ I:
1• ,i; /\
/ ~
',,,. ~
.... )
u
'I" I'
\,.
t 11.
' ' \,!
! ., I 'l• ' ~ '
~:,, ·1·-
' '. \1:1 '\-p_ ·111 I,\\
~;:
ii: \ .tµ,
···-...... ,,,'
el
/
w2
,
_/-
·.J c:::.".''..J
c,·t·"'·'' b• '~'.7:y:·,;·; .. ,.}{::·;yfl{:;: ' ' .::·wl:·::··;
\ ~ n... , I \ ! . .., ,
1··' Ut.,, 'l,; ·<'l' ' ,, ' qc<, \·1•\ i·\' ,
ci ·n .. f,. \1_\ I~ .,, ,/ l _ (.
---i}\J -\,_ \11\:c;>-,}~,\_ t--· ;\_ -B~_·_.
,.. ',, "l \ \ ! ,;, /\ :, ' ' ,}, __ ...... ~·("
( \ ''1 ,' ' \i \ i' :'. ,,;.
.,.11 I \.,.JJ\...... ·\. 1
1
i <1>·
· J.j t .--', ' c"\_ .'·-)':.\ 1 _ __., __ •
---~::--.....;,-~,.;.' C J ', ····•?·•--") ,· ·---~\ __ · 1rr;;=,{---, \ji;Jv
! 1 ·t 1:t-~ ··: / 'i \ I
j. j it l "-\,.l_l ,,.,..... \. ~ ;,: " '··,, ·t f~·-.
i \ :/ if '',.\ \
'•,+t.-, •. !1..,,.>-;.A.,,_)l!,.l-,..;i,,· l (~ 1. -'-,.,, .:,, ~ -~•'•~,-1
1
1
f""\ 'r ~--~ ~-1~,_.:,,,..._, r,... ~ '>" '-~-•• ,..,~~ l
i,.... l .', ' -~-r, . J
I , , · , "• ; ) 1
JHf\ ',•, '}-'~111 _. ·,,, I ; "· '1 , ·, " n , ;
_,--,, -------~--i-'1 ··-; i ,_ -, f' / '1 I ,, -·, , i lj.. , --' I ·
: 1_;: · • ,0
, ,."'"' : i1 .. __ Lf ..... J._ -:::.:tt::.:·.:·;·-~ ,· t·,, ·,"p,-,;c;f,~>'··,:" ,' ;~ . .':~:::· .... \ .. ~ ,.-.-,--~-.. -~···•·,•·'-.•
",t .... ' 2 '' 1/'i ' ,P.'.''")8~ •1... e ,..,,, : \ ~·•·r .-· -:::rt., :." ., . .._ !• '~ I' ,\
i:,,,_:;~•••••::cc::·:::~:::::c::_o;::;~ l \ :/
.Ir .J!;.,..:::,• .. ,,,-JJ:;:.j,.,.t.,(,,_(-1,_.1l kJ..,> '\A,,,1 (, !· \ \,. . v<, .. ,.. , [.... 'j l
,..,"'-·w,._ ..} i , Jf"-',
: '•., I! 'JJ
.-;) -. ', \
'i
)
,.~
ti
,_ !'-' I_·' ·l )]!\\ \ iji1 \
I k \ jl:.:: .: ; ~~ i.L\
.I '. ''1.,. f 1 \ __
,•!" : ·,:...,_ 4<>1 ............ ,.... '.\ • ""'•·w,,:·-.."""'" .'
l
1
\ ,,,,N•·• \
' I, . { ' '"",.... '\ t ,,-., .. , ..... ,,.,. '"' -I:! '· Q 'II'"
l w ' Cl "\1·1·:' ·:,M·•·,,.,,,' -~!: 1~\'.· ) \,n, w r ~-·-----'81 I \ \ ~,(
\··1r
~·1 ,,,.,,:I' > , it ,~,,--.. [J . . \ -i= '/'
~ ., •. ·1 f
C''lr·,.., ... , ,,., .. , ... ;:,'..:;: '"·~---------~ C 1 JL·
~,-, '; (,f
\_ ''· '
,) i\i
j IK
I
e5
' ' ¥J:~\' :~/
,,---k. ,,,,_ :.:;_.· ....... ,kr: _ -· . ' ,,,
·-----..... 1------•!,. <, 60TH A-VE
.) ,: . ;"t "-, ; t··~-~, ",~ .. ;.';', .:/ ,, .. ,
,.r, t .-· t "
):::/·lfl .c:?·, ---,/!..-,,, ('· .,.. 'illi} ("'<''
,i , .
'qJ
' " ~\
J
. t.
_ _ tEVENDELL . ' . ' ... , --------" ,.
~r-,-,
LI 1 ,
'F' > . I • 1 ·,1Jr ~ /
•exl?~;t•
./(<J.3 AC>
~ J,
~ ~
;:
'{, ..
156TH AVE r '!, ·-"_"c,w7 ·--.
wEl_
1-
,I
, ~....) ls·u,1 ,1., . .,Ji,
' ~----·-"
., ,., ..... ~ \ ' \
' i
,: ',.,, \ j I
SITE; IS ·, b. /
, /i'RllJIITAlJ?:.,.,n! } ~:~ ·;.., -.. \ , .. r .. A.,. "'·
'/;_. ''·'\ \. \~·~ .. J
·1·1 ~ , ;,,1
;i I\ ·:,':°"1• \
"'("'"
\, \. \
SITE JS 5% OF
TRIBU;rflRY AREA':
·.1:,.··'cy·
'\ ..
,. ...
I ,,
·:· .. ,-... : .... ···~-
.. ~-:·-.,"
' l ,. 11 .• .,-·
\! (/
HT ~ 1 \ ..
!i'
! :
·•'' (
; {
''· ,d
\\:,.-:.
,:'..'""
' ,·~·-, _,. . .,..'.-,("""')("", !//''
'"·:·~.-.,.,.~,.'.;?~,~~::(~··:
' ···:ca.L
·1: i<'•
'-til > ,.._,):,. ,!u
. 451;, ·~:· (:; ;1,:.
e6 '\.,, C w, .. ~.' I"/ '' '
•''•'\ !"''''!, ~~:.;, ~.,., .. /'
...... ,
.(,,.
<""\
;)
\
r·;
SITE IS 9% OF
TRIBUTARY AREA
PROJECT
NO. Haozous Engineering
CIVJL ENGIIEERING EVENDELL PLAT.
l!I ll:fll
1'1-816 SE U6TH ST, RENTON, IJA 98059
425-235-2707 -·· .. ,..
£'.JM S/12/02 ....... DATO
E:JM S/12/02
rfGlJRE
Drainage Basins 2
• ... ....
SCM.£ 1H FIJ:T
LEGEND
a CQ tch BQsln
PS Pipe ID
~0-YeQr ! Floocllng Return Perlocl
,.
a
. -······-~l·-··1:~···::::·::.·~·-"
"}
;j i:
.::\ i
,:') ::
.l j'i ,, 'l (
I .
P15 1/ . •·•·
P16t;~ ·· ".'
~~~ :1:: ', . J~O-YeQ~T··~:
P121:I, , · . . , I '"' PU-'.• ··· .... , ....• ,,,
Pl :.:: .. · . ~25-Yeo.1 L
,. '·:.,.:· .... ':'"'' .. .'.;.;: .. : .... ,;{'.:Jt
·'. U fl F.' , "I ,,, ~
P7
P6
.• -!i ';·.-·
P117 n,
p«--llt,· .. ·· I P4 ·tt .... . , I . .'.. . . 1 ·• P116
Pl J/
··1'
, P115
.,, ..
i·;·
!2-Yeo,r j \)
·.'//
.,
'!
it;:
;;;tr;,,:];,· io
'·i[/
'"1ll'<"'I
i,-1 \;, Ci; 11 ;1·: ·i
<i ! .i) ~ f 1 ~I , l ···----.. --... -,----.-··-----_,: s-i (l?: : .. :
,_'J,:'''' I
Haozous llm.gineering
CML D!lilkWdlG
14816 8E 116TH IT, IElffllX. \IA ta99
42J.8ZI C,GI
D[SIGliED UY: """ w Q/12/111
ORA-. D~ w DATE:
11,111/111
r ,
~.\\'• ::
"fl·
1.·.1·:,:
'• I .
1~-YeQr I
......•...• \!.• ... ;"·.
-,
12,,,YeQr\ I
P110f\\ 110-YeQr I
:_ r,;~( ·i CJ·
lii,11 .;{]\;t,·
~ Ul,\I t I ' / •• , ' '.. \, ~i i •
EVENDELL PLAT
Flooding Locations·
PROJECT
NO.
FIGURE
4
200 400
,} ,Q .Pi-)
SCAt.£ IN F'[tl
Haozous Engineering
CIVIL ENGil£ERING
14816 SE U6TH ST, RENTON, \,IA 980:59
4ll5-235-2707
......,, .. .. ,..
E'JM B/12/02 ...... .,. ....
B/12/02 E'JM
}I~~l~:.
EVENDELL PLAT
Land Use/Cover Types
PROJECT
NO.
FlGlJRE
3
Appendix A. Stonnshed Model lnpuUOutput
Design Storm Rainfall Amounts
Return Rainfall
Period Amount
(YRS) (IN)
2 2.00
JO 3.00
25 3.50
50 3.75
JOO 4.00
' .,
Appendix A.1. Subbasin Summary-East Basin
Drainage Area: e-001
Hyd Method: SBUH Hyd
Peak Factor: 484.00
Storm Dur: 24.00 hrs
Area CN
Pervious 17. 8000 ac 85. 70
Impervious 1.9000 ac 98.00
Total 19. 7000 ac
Pervious CN Data:
Subbasin e-001 Perv .
Impervious CN Data:
Subbasin el Imperv
Pervious TC Data:
Flow type: Description:
Sheet e I sheet
Shallow e 1 shallow
Channel e 1 channel
Impervious TC Data:
Flow type: Description:
Fixed None Entered
85.70
98.00
Loss Method: SCS CN Number
SCS Abs: 0.20
Intv: 10.00 min
TC
0.98 hrs
0.17 hrs
17.8000 ac
1.9000 ac
Length: Slope:
300.00 ft 1. 70%
1484.00 ft 1.50%
950.00 ft 1.10%
Length: Slope:
0.00 ft 0.00%
Coeff:
0.1500
11.0000
17.0000
Travel Time
31.85min
18.36 min
8.88 min
Coeff: Travel Time
10.0000 10.00 min
Drainage Area: e-002
Hyd Method: SBUHHyd
Peak Factor: 484.00
Storm Dur: 24.00 hrs
Area
Pervious 26.9000 ac
Impervious 7.0000 ac
Total 33.9000 ac
Pervious CN Data:
Subbasin e-002 Perv
Impervious CN Data:
Subbasin el Imperv
Pervious TC Data:
Flow type: Description:
Sheet e2 sheet
Shallow e2 shallow
Channel e2 channel
Impervious TC Data:
Flow type: Description:
Fixed None Entered
CN
84.70
98.00
84.70
98.00
Loss Method: SCS.CN Number
SCS Abs: 0.20
lntv: 1000 min
TC
1.01 hrs
0.17 hrs
26.9000 ac
7.0000 ac
Length: Slope:
300.00 fl 1.70%
922.00fl 1.60%
1824.00 fl 1.00%
Length: Slope:
0.00 fl 0.00%
Coeff: Travel Time
0.1500 31.85 min
11. 0000 I l. 04 min
17.0000 17.88 min
Coeff: Travel Time
10.0000 10.00 min
Drainage Area: e-003
Hyd Method: SBUHHyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: · 10.00 min
Area CN TC
Pervious 2.3000 ac 85.30 0.60 hrs
Impervious 0.1000 ac 98.00 0.17 hrs
Total 2.4000 ac
Pervious CN Data:
Subbasin e-003 Perv 85.30 2.3000 ac
Impervious CN Data:
Subbasin e3 lmperv 98.00 0.1000 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel
Time
Sheet e3 sheet 300.00 ft 1.70% 0. 1500 31.85 min
Shallow e3 shallow 264.00 ft 1.10% 11.0000 3.81 min
Channel e3 channel 106.00 ft 2.80% I 7.0000 0.62 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel
Time
Fixed None Entered 0.00 ft 0.00% 10.0000 10.00 min.
.·1
Drainage Area: e-004
Hyd Method: SBUHHyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 0.9000ac 86.00 0.55 hrs
Impervious 0.2000 ac 98.00 0.17hrs
Total 1.1000 ac
Pervious CN Data:
Subbasin e-004 Perv 86.00 0.9000 ac
Impervious CN Data:
Subbasin e4 Imperv 98.00. 0.2000ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff Travel Time
Sheet e4 sheet 300.00 ft 1.70% 0.1500 31.85min
Channel e4 channel 200.00 ft 2.00% 17.0000 1.39 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Fixed None Entered 0.00 ft 0.00% 10.0000 10.00min
Drainage Area: e-005
Hyd Method SBUH Hyd
Peak Factor: 484.00
Stonn Dur: 24.00 hrs
Area CN
Pervious 18.1000 ac 84 .80
Impervious 5.4000 ac 98.00
Total 23.5000 ac
Pervious CN Data:
Subbasin e-005 Perv
Impervious CN Data:
Subbasin e5 Imperv
Pervious TC Data:
Flow type: Description:
Sheet e5 sheet
Shallow eS shallow
Sheet e5 channel
Impervious TC Data:
Flow type: Description:
Fixed None Entered
84.80
98.00
Loss Method: SCS CN Number
SCS Abs: 0.20
· Intv: 10.00 min
TC
1.81 hrs
0.17 hrs
18.1000 ac
5.4000 ac
Length: Slope:
300.00 ft 2.70%
1248.00 fl 1.80%
705. 00 ft 1.40%
Length: Slope:
0.00 ft . 0.00%
Coeff: Travel Time
0.1500 26.47 min
11.0000 14.09 min
0.1500 68.19 min
Coeff: Travel Time
10.0000 10.00 min
Drainage Area: e-006
Hyd Method: SBUHHyd
Peak Factor: 484.00
Storm Dur: 24.00 hrs
Area CN
Pervious 28.1000 ac 83.20 .
Impervious 2.3000 ac 98.00
Total 30.4000 ac
Pervious CN Data:
Subbasin e-006 Perv 83.20
Impervious CN Data:
Subbasin e5 Imperv 98.00
Pervious TC Data:
Flow type: Description: Length:
Sheet e6 sheet
Shallow e6 shallow
Impervious TC Data:
Flow type: Description:
Fixed None Entered
Loss Method: SCS CN Number
SCS Abs: 0.20
Intv: 10.00 min
TC
1.35 hrs
0.17 hrs
28.1000 ac
2.3000 ac
Slope: Coeff: Travel Time
300.00 ft 1.00%
I 777.00 ft 2.00%
Length: Slope:
0.00 ft 0.00%
0.1500 39.38 min
5.0000 41.88 min
Coeff: Travel Time
10.0000 10.00 min
.,
Drainage Area: e-007
Hyd Method: SBUH Hyd
Peak Factor: 484. 00
Stonn Dur: 24.00 hrs
Area
Pervious 1 .8000 ac
Impervious 0.0000 ac
Total 1.8000 ac
Pervious CN Data:
Subbasin e-007 Perv
Pervious TC Data:
Flow type: Description:
Sheet e7 sheet
CN
81.00
98.00
81.00
Loss Method: SCS CN Number
SCS Abs:
lntv:
TC
1.44 hrs
0.00 hrs
1.8000 ac
0.20
10.00min
Length: Slope:
300.00 ft 1.00%
Coeff: Travel Time
0.4000 86.31 min
-, Drainage Area: ex_ east
Hyd Method: SBUHHyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs lntv: 10.00min
Area CN TC
Pervious 11.1000 ac 81.80 2.10 hrs
Impervious 0.5000 ac 98.00 0:17 hrs
Total 11.6000 ac
Pervious CN Data:
Subbasin ex_ east Perv 81.80 11.IOOOac
Impervious CN Data:
Subbasin ex_east Imperv 98.00 0.5000 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet ex east sheet 300.00 ft 1.00% 0.4000 86.31 min
Shallow ex east shallow 876.00 ft 1.50% 3.0000 39.74 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Fixed None Entered 0.00 ft 0.000/o 10.0000 10.00 min
Appendix A.2. Subbasin Summary-West Basin
Drainage Area: w-001
Hyd Method: SBUHHyd
Peak Factor: 484.00
Storm Dur: 24.00 hrs
Area
Pervious 2.3000ac
Impervious 0.6000 ac
Total 2.9000 ac
Pervious CN Data:
Subbasin wl Perv
Impervious CN Data:
Subbasin wl
Pervious TC Data:
Flow type: Description:
Time
Channel wl
Impervious TC Data:
Flow type: Description:
Time
Fixed wl
Loss Method: SCS CN Number
SCS Abs: 0.20
Intv: 10.00 min
CN TC
86.00 0.26 hrs
98.00 0.17 hrs
86.00 2.3000 ac
98.00 0.6000 ac
Length: Slope: Coeff: Travel
2610.00 ft 2.70% 17.0000 15.57 min
Length: Slope: Coeff: Travel
0.00 ft 0.00%,. 10.0000 10.00 min
.,
Drainage Area: w-002
HydMethod: SBUHHyd
Peak Factor: 484.00
Storm Dur: 24.00 hrs
Area
Pervious 14.5000 ac
Impervious L8000ac
Total 16.3000 ac
Pervious CN Data:
Subbasin w2 Perv
Impervious CN Data:
Subbasin w2 Imperv
Pervious TC Data:
Flow type: Description:
Time
Sheet None Entered
Shallow None Entered
Impervious TC Data:
Flow type: Description:
Time
Fixed None Entered
CN
86.00
98.00
86.00
98.00
Loss Method: SCS CN Number
SCS Abs: 0.20
Jlitv: 10.00 min
TC
0.57 hrs
0.17 hrs
14.5000 ac
1.8000 ac
Length: Slope: Coeff: Travel
300.00 ft 1.70% 0.1500 31.85 min
585.00 ft 12.00% 11.0000 2.56 min
Length: Slope: Coeff: Travel
0.00 ft 0.00%, 10.0000 10.00 min
Drainage Area: w-003
-
Hyd Method: SBUHHyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 1.0000 ac 86,00 0.27 hrs
Impervious 0.2000 ac 98.00 0.17 hrs
Total l.2000 ac
Pervious CN Data:
Subbasin w3 Perv 86.00 1.0000 ac
Impervious CN Data:
Subbasin w3 Imperv 98.00 0.2000 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel
Time
Sheet w3 sheet 300.00 ft 10.70% 0.1500 15.26 min
Channel w3 channel 272.00 ft 4.80% 17.0000 1.22 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel
Time
Fixed None Entered 0.00 ft 0.00% 10.0000 10.00 min
Drainage Area: w-004
HydMethod: SBUHHyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: J0.00 min
Area CN TC
Pervious 2.7000 ac 86.00 0.43 hrs
Impervious 0.5000 ac 98.00 0.17hrs
Total 3.2000 ac
Pervious CN Data:
Subbasin w4 Perv 86.00 2.7000 ac
Impervious CN Data:
Subbasin w4 98.00 0.5000 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel
Time
Sheet w4 sheet 300.00 ft 3.30% 0.1500 24.43 min
Shallow w4 shallow 292.00 ft 7.50% 11.0000 1.62 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel
Time
Fixed None Entered 0.00 ft 0.00% 10.0000 J0.00 min
, .,
Drainage Area: w-005
Hyd Method: SBUHHyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 1.8000 ac 86.00 0.29 hrs
Impervious 0.4000 ac 98.00 0.17hrs
Total 2.2000 ac
Pervious CN Data:
Subbasin w5 Perv 86.00 1.8000 ac
Impervious CN Data:
Subbasin w5 98.00 0.4000 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet w5 sheet 300.00 ft 10.00% 0.1500 15.68 min
Shallow w5 shallow 322.00 ft 6.80% 11.0000 1.87 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel
Time
Fixed None Entered 0.00 ft 0.00% 10.0000 10.00min
,
:I
Drainage Area: w-006
.
Hyd Method: SBUHHyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10:00 min
Area CN TC
Pervious 2.5000 ac 84.50 0.82 hrs
Impervious 1.3000 ac 98.00 0.17hrs
Total 3.8000 ac
Pervious CN Data:
Subbasin w6 Perv 84.50 2.5000 ac
Impervious CN Data:
Subbasin w6 98.00 1.3000 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff Travel
Time
Sheet w6 sheet 300.00 ft 0.70% 0.1500 45.42 min
Shallow w6 shallow 613.00 ft 6.50% 11.0.000 3.64 min
Impervious TC Data: ·
Flow type: Description: Length: Slope: Coeff Travel
Time
Fixed None Entered 0.00 ft 0.00% 10.0000 10.00 min
Drainage Area: w-007
HydMethod: SBUHHyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur: 24.00 hrs Intv: 10.00 min
Area CN TC
Pervious 5.4000 ac 84.50 0.53 hrs
Impervious 2.4000 ac 98.00 0.17 hrs
Total 7.8000 ac
Pervious CN Data:
Subbasin w7 Perv 84.50 5.4000 ac
Impervious CN Data:
Subbasin w7 98.00 2.4000 ac
Pervious TC Data;
Flow type: Description: Length: Slope: Coeff: Travel
Time
Sheet w7 sheet 300.00 ft 6.10% 0.2400 27.83 min
Shallow w7 shallow 655.00 ft 6.10% 11.0000 4.02 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel
Time
Fixed None Entered 0.00 ft 0.00% 10.0000 10.00 min
)
'
Drainage Area: w-008
Hyd Meth.ad: SBUHHyd
Peak Factor: 484.00
Stonn Dur: 24.00 hrs
Area
· Pervious 9.0000 ac
Impervious 0.0000 ac
Total 9.0000 ac
Pervious CN Data:
Subbasin w8 Perv
Pervious TC Data:
Flow type: Description:
Time
Sheet w8 sheet
Shallow w8 shallow
Impervious TC Data:
Flow type: Description:
Time
Fixed None Entered
CN
83.40
0.00
83.40
Loss Method: SCS CN Number
SCS Abs:
Intv:
0.20
10.00 min
TC
0.79 hrs
0.17 hrs
9.0000ac
Length: Slope:
300.00ft 6.70%
]020.00ft 6.90%
Length: Slope:
0.00 ft 0.00%
Coeff: Travel
0.4000 40.33 min
9.0000 7.19 min
Coeff:: Travel
10.0000 10.00 min
.,
Drainage Area: ex_west
Hyd Method: SBUH Hyd
Peak Factor: 484.00
Stonn Dur: 24.00 hrs
Area
Pervious I. 8000 ac
Impervious O. l 000 ac
Total 1.9000 ac
Pervious CN Data:
Subbasin ex_ west Perv
Impervious CN Data:
Subbasin ex west Imperv
Pervious TC Data:
Flow type: Description:
Time
Sheet ex west sheet
Impervious TC Data:
Flow type: Description:
Time
Fixed wl
CN
84.00
98.00
84.00
98.00
Loss Method: SCS CN Number
SCS Abs:
lntv:
0.20
10.00 min
TC
0.38 hrs
0.17 hrs
1.8000 ac
0.1000 ac
Length: Slope:
210.00 ft 4.80%
Length: Slope:
Coeff:
0.2400
Coeff:
Travel
23.02 min
Travel
0.00 ft 0.00% 10.0000 10.00 min
Table B.1. Hydrograph Routing -East Basin -2-Year Storm
ROUTEHYD O THRU [Existing East] USING TYPE1A AND [2 yr] NOTZERO ACTUAL
Reach Area Flow Full Q % Full nDepth Size nVel Nel CBasin / Hyd
ac cfs cfs ratio fl fl/s fl/s ------------
D-Dum2 19.7 2.1303 122.33 0.02 0.3312 X-Sect 3.0688 ---e-001
D-Dum1 53.6 6.625 122.33 0.05 0.5728 X-Sect 4.4532 ---e-002
D-145 53.6 6.5953 121.12 0.05 0.5744 X-Sect 4.4169 -
D-144 53.6 6.5642 117.92 0.06 0.6659 X-Sect 4.3432 --
D-143 53.6 6.5478 122.41 0.05 0.6381 X-Sect 4.0213 --
D-142 53.6 6.5467 82.3869 0.08 0.6881 X-Sect 3.5759-
D-141 53.6 6.5465 10.3949 0.63 1.6141 X-Sect 1.1146 --
P-117 65.2 7.0246 6.5804 1.07 0.9037 12" Diam 9.4073 8.3784 ex_east
D-140 65.2 7.0224 124.5 0.06 0 .4 782 X-Sect 3.1305 ----
D-139 65.2 7.018 117.81 0.06 0.4685 X-Sect 3.4675-
D-138 65.2 7.013 94.8108 0.07 0.6314 X-Sect .3.4413 ---
D-137 67.6 7.2807 279 0.03 0.4113 X-Sect 5.3323 --e-003
P-116 67.6 7.2787 7.2535 1 1.2342 18" Diam 4.6787 4.1046
D-136 67.6 7.2745 61.7242 0.12 0.6832 X-Sect 3.5858 --
D-135 67.6 7.2645 66.6905 0.11 0.7836 X-Sect 2.9393 --
D-134 67.6 7.2596 70.9939 0.1 0.5719 X-Sect 3.6244 ----
D-133A 67.6 7.2557 93.7984 0.08 0.6719 X-Sect 3.6325 ----
D-133 67.6 7.2549 26.6671 0.27 1.4156 X-Sect 1.1841 --
P-115 68.7 7.4254 6.9473 1.07 0.9067 12" Diam 9.9203 8.8456 e-004
D-132 68.7 7.4237 226.87 0.03 0.5902 X-Sect 5.7063-
P-114 92.2 10.2247 18.9199 0.54 1.0474 24" Diam 6.1392 6.0224 e-005
D-131 92.2 10.2216 338.51 0.03 0.5631 X-Sect 4.9185 -
D-130 92.2 10.2183 33.2703 0.31 0.8395 X-Sect 4.3224-
D-129 92.2 10.2164 8.6723 1.18 -1 X-Sect 1.178 ---
P-113 92.2 10.212 23.5738 0.43 0.6902 18" Diam 12.8615 13.34
D-128 92.2 10.2081 266.41 0.04 0.6392 X-Sect 4.3565 --
D-127 92.2 10.1973 1354.11 0.01 0.6263 X-Sect 2.0863 ----
D-126 92.2 10.1853 491.48 0.02 0.3323 X-Sect 1.4977 -'--
D-125 92.2 10.132 3470.27 0 0.3539 X-Sect 0.8642 --
D-124 92.2 9.9841 549.84 0.02 0.2991 X-Sect 0.5983-
D-123 92.2 9.9643 3827.85 0 0.4105 X-Sect 1.946-
P-112 92.2 9.9216 4.3371 2.29 -1 12" Diam 2.2876 5.5221
D-122 92.2 9.9128 50.2681 0.2 0.904 X-Sect 2.771 ----
D-121 122.6 12.0698 594.02 0.02 0.2893 X-Sect 10.2968 --e-006
P-111 122.6 12.0648 15.3148 0.79 1.0036 18" Diam 9.6013 8.6664
D-120 122.6 12.0245 18.2879 0.66 1.4658 X-Sect 2.1936 ----
D-119 .122.6 12.0107 17.5281 0.69 0.6067 X-Sect 4.6997 --
D-118 122.6. 12.0027 179.94 0.07 0.4436 X-Sect 5.2531 -
D-117 122.6 11".9926 61.1492 0.2 · 1.0638 X-Sect 2.9017 -
D-116 122.6 11.9823 27.9865 0.43 1.096 X-Sect 4.2499-
D-115 122.6 11.9814 78.2241 0.15 1.2007 X-Sect 4.2155 -
P-110 122.6 11.972 30.6525 0.39 0.868 24" Diam 9.156 9.757
D-114 122.6 11.9572 47.75 0.25 1.1715 X-Sect 4.2164 --
D-113 124.4 12.0112 319.76 0.04 0.6751 X-Sect 5.8978 -----e-007
D-112 124.4 12.0055 1134.16 0.01 0.5548 X-Sect 5.7484 --
D-111 124.4 11.9853 413.21 0.03 0. 7639 X-Sect 3.7479 --
.·1
D-110 124.4 11.9689 241.55 0.05 0.698 X-Sect 3.9096 -----
Reh App Bend Junct HW Max El/
Loss Head Loss Loss Elev Rim El
Fr Node To Node fl fl fl ft ft ft
N-110 408.288
N-111 N-110 409.238 -na----na----na--409.238 411.92
N-112 N-111 409.9703 --na---na----na--409.9703 414.13
N-113 N-112 411.6608 --na----na----na--411.6607 415.64
N-114 N-113 412.5349 -na--na----na--412.5349 415.67
N-115 N-114 414.1314 -na----na---na--414.18 414.08
N-116 N-115 415.5033 -na--na---na-415.5033 416.5
N-117 N-116 415.5562 -na--na--na--415.5562 416.39
N-118 N-117 416.3861 -na---na---na-416.3861 416.39
N-119 N-118 416.626 --na--na---na--416.71 416.61
N-120 N-119 418.44 --na---na----na--418.24 418.14
N-121 N-120 420.9399 --na----na----na-420.43 420.33
N-122 N-121 421.5157 -na--na---na-421.5157 422.69
N-123 N-122 422.9861 -na--na---na-422.9861 423.31
N-124 N-123 425.626 -na--na---na--423.41 423.31
N-125 N-124 423.64 --na---na---na--423.64 424.05 ·
N-126 N-125 433.8967 --na---na----na--424.9 424.8
N-127 N-126 425.6399 --na---na----na--425.6399 426.02
N-128 N-127 426.0798 --na--na---na--426.0798 426.52
NC129 N-128 427 .6098 --na--na----na-427.6097 428.27
N-130 N-129 429.6497 -na--na--na-429.4 429.3
N-131 N-130 430.9699 -na---na---na-430.83 430.73
N-132 N-131 432.4499 --na---na---na-432.45 432.79
N-133 N-132 437.2623 --na----na----na--436.5 436.4
N-134 N-133 436.5119 --na---na----na--436.03 435.93
N-135 N-134 437.4999 -na---na---na--437.57 437.47
N-136 N-135 440.3899 --na----na---na--440.25 440.15
N-137 N-136 441.418 -na--na----na-441.418 442.1
N-137A N-137 442.088 --na---na---na--441.99 441.89
N-138 N-137A 445.5185 --na--na----na-442.9 442.8
N-139 N-138 442.9019 -na---na---na-442.9 442.8
N-140 N-139 443.8899 --na---na---na--443.14 443.04
N-141 N-140 444.3999 -na-. --na---na-444.3999 444.84
N-142 N-141 445.6699 -na--na--na--445.6699 446.11
N-143 N-142 446.8898 -na--na---na-446.8898 447.71
N-144 N-143 448.3436 --na---na---na--448.2 448.1
N-145 N-144 448.4599 --na---na--na-" · 447.84 447.74
N-146 N-145 449.6399 --na---na--na--449.6399 449.84
N-147 N-146 452.3699 --na---na--na-452.3698 452.71
N-148 N-147 453.5398 -na--na--na-453.5398 453.89
N-149 N-148 456.7368 -na--na--na-454.3 454.2
N-150 N-149 454.303 -na--na--na-454.3029 454.65
N-151 N-150 456.4129 --na--na--na-455.87 455.77
N-152 N-151 460.5699 -na---na--na-460.56 460.46
N-153 N-152 463.89 -na--na---na--463.89 464.17
N-154 N-153 467.8199 --na----na---na-467.44 467.34
.·!
Table B.2. Hydrograph Routing-East Basin -10-Year Storm
ROUTEHYD [] THRU [Existing East] USING TYPE1A AND [10 yr] NOTZERO ACTUAL
Reach Area Flow Full a % Full nDepth Size nVel Nel CBasin /Hyd
ac cfs cfs ratio ft ft/s ft/s ----------
D-Dum2 19.7 4.4884 122.33 0.04 0.4719 X-Sect 3.935 ----e-001
D-Dum1 53.6 13.1058 122.33 0.11 0.81 X-Sect 5.5304 ---e-002
D-145 53.6 13.1051 121.12 0.11 0.8142 X-Sect 5.4927 -
D-144 53.6 13.1036 117.92 0.11 0.9649 X-Sect 5.2679 -----
D-143 53.6 13.1 122.41 0.11 0. 9032 X-Sect 4.856 ----
D-142 53.6 13.0953 82.3869 0.16 0.9821 X-Sect 4.3102 --
D-141 53.6 13.0948 10.3949 1.26 -1 X-Secl 1.2597 ---
P-117 65.2 14.3238 . 6.5804 2.18 -1 12" Diam 2.1767 8.3784 ex_ east
0-140 65.2 14.3181 124.5 0.12 0.6926 X-Sect 3.9913 ---
0-139 65.2 14.3076 117.81 0:12 0.6891 X-Sect 4.3262-
0-138 65.2 14.2973 94.8108 0.15 0.9065 X-Sect 4.2086 ---
0-137 67.6 14.8971 279 0.05 0.5622 X-Sect 6.5644-e-003
P-116 67.6 14.8875 7.2535 2.05 -1 18" Diam 2.0525 4.1046
0-136 67.6 14.8791 61.7242 0.24 0.9641 X-Sect 4.5155 --
0-135 67.6 14.86 66.6905 0.22 1 .1209 X-Sect 3.6062 ----
D-134 67.6 14.8509 70.9939 0.21 0.8189 X-Sect 4.472--
D-133A 67.6 14.8437 93.7984 0.16 0.899 X-Sect 4.4767 --·
0-133 67.6 14.8424 26.6671 0.56 1.9795 X-Sect 1.4503 --
P-115 68.7 15.1643 6.9473 2.18 -1 12" Diam 2.1828 8.8456 e-004
0-132 68.7 15.1617 226.87 0.07 0.8315 X-Secl 7.0313 --
P-114 92.2 20.3817 18.9199 1.08 -1 24" Diam 1.0773 6. 0224 e-005
0-131 92.2 20.3728 338.51 0.06 0.8183 X-Secl 6.0985 -
D-130 92.2 20.3642 33.2703 0.61 1.2093 X-Secl 5.2653 --
D-129 92.2 20.3511 8.6723 2.35 -1 X-Sect 2.3467 ---
P-113 92.2 20.3415 23.5738 0.86 1.0749 18" Diam 15.0091 13.34
D-128 92.2 20.3328 266.41 0.08 0.9398 X-Sect 5.4109 ·-
D-127 92.2 20.3088 1354.11 0.01 0. 7502 X-Sect 2.4283 ---
0-126 92.2 20.2866 491.48 0.04 0.428 X-Sect 1.9106 ----
D-125 92.2 20.1873 3470.27 0.01 0.4582 X-Sect 1.0267 ··---
D-124 92.2 20.03 549.84 0.04 0.4223 X-Sect 0.7679-
D-123 92.2 19.9985 3827.85 0.01 0.5331 X-Sect 2.3162-
P-112 92.2 19.9587 4.3371 4.6 -1 12" Diam 4.6019 5.5221
D-122 92.2 19.9456 50.2681 0.4 1.2487 X-Sect 3.3192 ··-
0-121 122.6 24.93 594.02 0.04 0.4161 X-Sect 13.223-e-006
P-111 122.6 24.8832 15.3148 1.62 -1 18" Diam 1.6248 8.6664
D-120 122.6 24.6416 18.2879 1.35 -1 X-Sect 1.3474-
0-119 122.6 24.5438 17.5281 1.4 -1 X-Sect 1.4002 -
0-118 122.6 24.5308 179.94 0.14 0.6339 X-Sect 6.562-
D-117 122.6 24.5144 61.1492 0.4 1.4223 X-Sect 3.6544-
0-116 122.6 24.4971 27.9865 0.88 1.4271 X-Sect 5.1474 -
0-115 122.6 24.4955 78.2241 0.31 1.6574 X-Sect 5.1522 -
P-110 122.6 24.4801 30.6525 0.8 1.3515 24" Diam 10.8367 9.757
D-114 122.6 24.4557 47.75 0.51 1.5399 X-Sect 5.2816 -
0-113 124.4 24.6393 319.76 0.08 1.0057 X-Secl 7.2971 --e-007
D-112 124.4 24.6301 1134.16 0.02 0. 7 42 X-Sect 7.4221 -
D-111 124.4 24.5979 413.21 0.06 1 .1252 X-Sect 4.6448 --
D-110 124.4 24.5719 241.55 0.1 1. 0455 X-Sect 4.8977 -----
Reh App Bend Junct HW Max Ell
Loss Head Loss Loss Elev Rim El ..
Fr Node To Node fl fl fl fl fl fl
N-110 408.6355
N-111 N-110 409.5854 -na---na--na-409.5854 411.92
N-112 N-111 410.6952 --na----na---na--410.6952 414.13
N-113 N-112 412.3751 --na--na----na-412.3751 415.64
N-114 N-113 412.985 -na---na--na-412.985 415.67
N-115 N-114 414.5504 -na--na--na-414.18 414.08
N-116 N-115 417.346 -na--na--na-416.6 416.5
N-117 N-116 416.6529 -na--na--na-416.49 416.39
N-118 N-117 417.3199 -na--na---na-416.49 416.39
N-119 N-118 416.7623 --na-. 0-na----na-416.71 416.61
N-120 N-119 418.4399 -na---na---na-418.24 418.14
N-121 N-120 420.9399 -na----na---na-420.43 420.33
N-122 N-121 421.3322 -na----na--na-421.3322 422.69
N-123 N-122 427.5867 -na---na--na-423.41 423.31
N-124 N-123 426.0499 -na---na----na--423.41 423.31
N-125 N-124 423.6399 -na---na----na-423.64 424.05
N-126 N-125 465.1461 -na--na---na-424.9 424.8
N-127 N-126 425.6399 -na--na---na-425.6399 426.02
N-128 N-127 426.0798 -na--na--na-426.0798 426.52
N-129 N-128 427.6098 -na--na--na-427.6097 428.27
N-130 N-129 429.6497 -na--na---na-429.4 429.3
N-131 N-130 430.9699 -na--na--na-430.83 430.73
N-132 N-131 432.4499 -na--na--na-432.45 432.79
N-133 N-132 441.2068 -na---na--na--436.5 436.4
N-134 N-133 436.5119 -na--na---na-436.03 435.93
N-135 N-134 437.4999 -na--na---na-437.57 437.47
N-136 N-135 440.3699 -na---na----na-440.25 440.15
N-137 N-136 442.9103 -na---na---na-442.2 442.1
N-137A N-137 442 .67 --na---na---na--441.99 441.69
N-136 N-137A 458.8656 -na--na--na-442.9 442.6
N-139 N-138 443.1294 -na--na-. -na-442.9 442.8
N-140 N-139 443.69 --na---na---na--443.14 443.04
N-141 N-140 444.3999 -na--na----na-444.3999 444.84
N-142 N-141 445.7908 -na--na--na-445.7908 446.11
N-143 N-142 447.0106 -na--na---na-447.0107 447.71
N-144 N-143 451 .3791 -na---na--na-448.2 446.1
N-145 N-144 448.46 -na---na---na-447.84 447.74
N-146 N-145 449.6399 -na--na---na--449.6399 449.84
N-147 N-146· 452.3698 -na--na--na-452.3698 452.71
N-148 N-147 453.5397 -na--na--na-453.5397 453.89
N-149 . N-148 464.129 -na--na--na-454.3 454.2
N-150 N-149 454.3029 -na-. -na--na-454.3029 454.65
N-151 N-150 456.4128 --na---na---na-455.87 455.77
N-152 N-151 460.5699 -na~ -na---na-460.56 460.46
'J-153 N-152 . 463.6899 -na----na--na-463.89 464.17
4-154 N-153 467.8199 -na--na----na-467.44 467.34
:·{
Table B.3. Hydrograph Routing -East Basin -25-Year Stonn
ROUTEHYD O THRU (Existing East] USING TYPE1A ANO [25 yr] NOTZERO ACTUAL
Reach Area Flow Full Q % Full nDepth Size nVel Nel CBasin 1
ac cfs cfs. ratio ft ft/s ft/s
.. ~ __ .. ___
D-Dum2 19.7 5.7736 122.33 0.05 0.5347 X-Sect 4.2649 ---e-001
D-Oum1 53.6 16.6641 122.33 0.14 0 .9204 X-Sect 5.9522--e-002
0-145 53.6 16.6623 121.12 0.14 0.9253 X-Sect 5.911 ---
D-144 53.6 16.6597 117.92 0.14 1. 095 X-Sect 5.6189 --
D-143 53.6 16.6543 122.41 0.14 1.0158 X-Sect 5.1748 ---
D-142 53.6 16.6481 82.3869 0.2 1.1029 X-Sect 4.6242--
0-141 53.6 16.6444 10.3949 1.6 -1 X-Sect 1.6012--
P-117 65.2 18.3188 6.5804 2.78 -1 12" Diam 2.7838 8.3784 ex_east
0-140 65.2 18.3118 124.5 0.15 0. 7894 X-Sect 4.3271 ·-
D-139 65.2 18.2992 117.81 0.16 0.786 X-Sect 4.6556--
0-138 65.2 18.2868 94.8108 0.19 1.0247 X-Sect 4.5015 -
0-137 67.6 19.0686 279 0.07 0.6269 X-Sect 7.0354 ·-· e-003
P-116 67.6 · 19.0592 7.2535 2.63 -1 18" Diam 2.6276 4.1046
D-136 67.6 19.0493 61.7242 0.31 1.0913 X-Sect 4.8719 --
D-135 67.6 19.0273 66.6905 0.29 1.2672 X-Sect 3.86 ··--
D-134 67.6 19.0167 70.9939 0.27 0.926 X-Sect 4.7959 ---
D-133A 67.6 19.0082 93.7984 0.2 0.9908 X-Sect 4.8691 ---
D-133 67.6 19.0069 26.6671 0.71 2.2289 X-Sect 1.5584-
P-115 68.7 19.4194 6.9473 2.8 -1 12· Diam 2.7952 8.8456 e-004
0-132 68.7 19.4163 226.87 0.09 0.9372 X-Sect 7.5367--
P-114 92.2 25.943 18.9199 1.37 -1 24" Diam 1.3712 6.0224 e-005
0-131 92.2 25.9323 338.51 0.08 0.9321 X-Sect 6.5545-
0-130 92.2 25.9219 33.2703 0.78 1.3721 X-Sect 5.6512 ---
D-129 92.2 25.9106 8.6723 2.99 -1 X-Sect 2.9877--
P-113 92.2 25.8992 23.5738 1.1 -1 18" Diam 1.0986 13.34
D-128 92.2 25.8888 266.41 0.1 1.076 X-Sect 5.818 -·
D-127 92.2 25.8608 1354.11 0.02 0.8003 X-Sect 2.5676-
0-126 92.2 25.8358 491.48 0.05 0.4713 X-Sect 2.076 -··-
D-125 92.2 25.7224 3470.27 0.01 0.5018 X-Sect 1.0908 -
0-124 92.2 25.5489 549.84 0.05 0.478 X-Sect 0.836-
D-123 92.2 25.5134 3827.85 0.01 0.584 X-Sect 2.4616-
P-112 92.2 25.4763 4.3371 5.87 -1 12· Diam 5.8741 5.5221
0-122 92.2 25.4617 50.2681 0.51 1.3879 X-Sect 3.5601 --
D-121 122.6 32.0486 594.02 0.05 0.4735 X-Sect 14.376-e-006
P-111 122.6 32.0049 15.3148 2.09 -1 18" Diam 2.0898 8.6664
D-120 122.6 31.7866 18.2879 1.74 -1 X-Sect 1.7381-
0-119 122.6 31.6961 17.5281 1.81 -1 X-Sect 1.8083 -
D-118 122.6 31.6812 179.94 0.18 0. 7203 X-Sect 7.0837-
D-117 122.6 31.6627 61.1492 0.52 1 ,5908 X-Sect 3.9591 --
D-116 122.6 31.6418 27.9865 1.13 -1 X-Sect 1.1306-
D-115 122.6 31.64 78.2241 0.4 1 . 866 X-Sect 5.5186-
P-110 122.6 31.6228 30.6525 1.03 1.7027 24" Diam 11.096 9.757
D-114 122.6 31.5955 47.75 0.66 1.7176 X-Sect 5.6991 -
D-113 124.4 31.8576 319.76 0.1 1 .1584 X-Sect 7.8462-e-007
0-112 124.4 31.8471 1134.16 0.03 0.8307 X-Sect 8.1092-
D-111 124.4 31.8116 413.21 0.08 1.2906 X-Sect 4.9987-
D--110 124.4 31.7828 241.55 0.13 1 .207 X-Sect 5.2894-
Reh App Bend · Junct HW Max El/
Loss Head Loss Loss Elev Rim El
Fr Node To Node fl fl fl fl fl fl
N-110 408.797
N-111 N-110 409.747 --na----na----na-409.747 411.92
N-112 N-111 410.8606 -na----na---na-410.8606 414.13
N-113 N-112 412. 5405 --na----na----na--412.5405 415.64
N-114 N-113 413.1504 --na---na--na-413.1505 415.67
N-115 N-114 414.8065 -na---na---na-414.18 414.08
N-116 N-115 418.962 -na----na--na-416.6 416.5
N-117 N-116 416.6529 -na----na--na-416.49 416.39
N-118 N-117 417.3199 -na--na--na-416.49 416.39
N-119 N-118 416.9307 -na---na--na-416.71 416.61
N-120 N-119 418.4399 -na---na--na-418.24 418.14
N-121 N-120 420. 9399 --na----na---na-420.43 420.33
N-122 N-121 421.5229 --na----na----na-421.5229 422.69
N-123 N-122 431.8698 -na----na--na-423.41 423.31
N-124 N-123 426.0499 -na--na--na-423.41 423.31
N-125 N-124 423.64 --na----na---na-423.64 424.05
N-126 N-125 491.2671 --na----na--na--424.9 424.8
N-127 N-126 425.6399 -na--na--na-425.6399 426.02
N-128 N-127 426.0798 -na--na--na-426.0798 426.52
N-129 N-128 427.6098 -na--na--na-427.6097 428.27
N-130 N-129 429.6497 -na--na--na-429.4 429.3
N-131 N-130 430.9699 --na---na--na-430.83 430.73
N-132 N-131 432.45 -na--na---na-432.45 432.79
N-133 N-132 437 .2202 --na--na---na-436.5 436.4
N-134 N-133 436.5119 -na---na---na-436.03 435.93
N-135 N-134 437 .85 --na---na---na-437.57 437.47
N-136 N-135 440.39 --na--na---na-440.25 440.15
N-137 N-136 444.033 --na--na---na-442.2 442.1
N-137A N-137 442.8699 -na--na---na-441.99 441.89
N-138 N-137A 469.665 --na---na---na-442.9 442.8
N-139 N-138 443.3789 -na--na--na-442.9 442.8
N-140 N-139 443.89 --na--na---na-443.14 443.04
N-141 N-140 444.3999 -na--na--na-444.3999 444;84
N-142 N-141 445.9371 -na---na--na-445.9371 446.11
N-143 N-142 447.157 -na---na--na-447.157 447.71
N-144 N-143 453.928 -na----na---na-448.2 448.1
N-145 N-144 448.46 -na--na--na-447.84 447.74
N-146 N-145 449.6399 -na---na---na-449.6399 449.84
N-147 N-146 452.3699 -na---na--na-452.3699 452.71
N-148 N-147 453.5398 -na---na--na-453.5398 453.89
N-149 N-148 470.8597 -na---na--na-454.3 454.2
N-150 N-149 454.3029 -na---na--na-454.3029 454.65
N-151 N-150 456.4129 -na---na---na--455.87 455.77
N-152 N-151 460.5699 -na.:. -na---na--460.56 460.46
1-153 N-152 463.8981 -na---na--na-463.8981 464.17
N-154 N-153 467.828 -na--na--na-467.44 467.34
, .,
Table 8.4. Hydrograph Routing -East Basin -SO-Year Stonn
ROUTEHYD O THRU [Existing East] USING TYPE1A AND [50 yr] NOTZERO-ACTUAL
Reach Area Flow Full Q % Full. nDepth Size nVel Nel CBasin I Hyd
ac cfs cfs ratio ft ft/s ftls -----------
D-Dum2 19.7 6.4328 122.33 0.05 0.5644 X-Sect 4.4125 ----e-001
D-Dum1 53.6 18.4875 122.33 0.15 0.9737 X-Sect 6.1401 -----e-002
D-145 53.6 18.4851 121.12 0.15 0. 9789 X-Sect 6.0973-
D-144 53.6 18.482 117.92 0,16 1.1561 X-Sect 5.7757 --
D-143 53.6 18.4757 122.41 0.15 1.0682 X-Sect 5.3178 ----
D-142 53.6 18.4689 82.3869 0.22 1.16 X-Sect 4.7688 --
D-141 53.6 18.4652 10.3949 1.78 -1 X-Sect 1.7764-
P-117 65.2 20.3744 6.5804 3.1 -1 12" Diam 3.0962 8.3784 ex_east
D-140 65.2 20.3667 124.5 0.16 0.8355 X-Sect 4.4786-
D-139 65.2 20.3531 117.81 0.17 0.8317 X-Sect 4.8035-
D-138 65.2 20.3398 94.8108 0.21 1.0799 X-Sect 4.6329 ----
D-137 67.6 21.2149 279 0.08 0.6572 X-Sect 7.2468 -e-003
P-116 67.6 21.2056 7.2535 2.92 -1 18" Diam 2.9235 4.1046
D-136 67.6 21.1949 61.7242 0.34 1 . 152 X-Sect 5.0314 --
D-135 67.6 21.1716 66.6905 0.32 1.3357 X-Sect 3.9737 --
D-134 67.6 21.1602 70.9939 0.3 0.9762 X-Sect 4.9411 ----
D-133A 67.6 21.1511 93.7984 0.23 1.035 X-Sect 5.0466-
D-133 67.6 21.1496 26.6671 0.79 2. 3487 X-Sect 1.6064 --
P-115 68.7 21.6082 6.9473 3.11 -1 12" Diam 3.1103 8.8456 e-004
D-132 68.7 21.605 226.87 0.1 0.9869 X-Sect 7.7628-
P-114 92.2 28.7909 18.9199 1.52 -1 24" Diam 1.5217 6.0224 e-005
D-131 92.2 28.7784 338.51 0.09 0.9857 X-Sect 6.7585-
D-130 92.2 28.7663 33.2703 0.86 1 .4508 X-Sect 5.8219 -
D-129 92.2 28.7555 8.6723 3.32 -1 X-Sect 3.3158 ---
P-113 92.2 28.7428 23.5738 1.22 -1 18" Diam 1.2193 13.34
D-128 92.2 28.731 266.41 0.11 1. 1405 X-Sect 5.9997-
D-127 92.2 28.699 1354.11 0.02 0.8231 X-Sect 2.6309 --
D-126 92.2 28.6712 491.48 0.06 0.4918 X-Sect 2.1506 --
D-125 92.2 28.5445 3470.27 0.01 0.5218 X-Sect 1.1196 --
D-124 92.2 28.3566 549.84 0.05 0.5043 X-Sect 0.8666 -----
D-123 92.2 28.3183 3827.85 0.01 0.6073 X-Sect 2.5267-
P-112 92.2 28.2813 4.3371 6.52 -1 12" Diam 6.5208 5.5221
D-122 92.2 28.2656 50.2681 0.56 1.4497 X-Sect 3.6834-
D-121 122.6 35.6853 594.02 0.06 0.5006 X-Sect 14.8923 ---e-006
P-111 122.6 35.6419 15.3148 2.33 -1 18" Diam 2.3273 8.6664
D-120 122.6 35.4329 18.2879 1.94 -1 X-Sect 1.9375-
D-119 122.6 35.3437 17.5281 2.02 -1 X-Sect 2.0164 -
D-118 122.6 35.3278 179.94 0.2 0. 7605 X-Sect 7.315 --
D-117 122.6 35.308 61.1492 0.58 1.6707 X-Sect 4.0938-
D-116 122.6 35.2852 27.9865 1.26 -1 X-Sect 1.2608 -
D-115 122.6 35.2833 78.2241 0.45 1.9632 X-Sect 5.68-
P-110 122.6 35.2651 30.6525 1.15 -1 24" Diam 1.1505 9.757
D-114 122.6 35.2359 47.75 0.74 1.8022 X-Sect 5.8823-
D-113 124.4 35.5397 319.76 0.11 1.2299 X-Sect 8.0881 ----e-007
)-112 124.4 35.5284 1134.16 0.03 0.8726 X-Sect 8.4163 -
D-111 124.4 35.4908 413.21 0.09 1.3677 X-Sect 5.1548 --
D-110 124.4 35.4602 241.55 0.15 1.2828 X-Sect 5.4622 ---
Reh App Bend Junct HW Max El/
Loss Head Loss Loss Elev Rim El ...
Fr Node To Node ft ft ft ft ft ft
N-110 · 408.8728
N-111 N-110 409.8228 --na----na---na--409.8228 411.92
N-112 N-111 410.9377 -na----na---na--410.9377 414.13
N-113 N-112 412.6176 -na---na---na--412.6176 415.64
N-114 N-113 413.2275 -na----na---na-413:2275 415.67
N-115 N-114 414.9305 --na--na---na-414.18 414.08
N-116 N-115 415.8377 -na--na--na-415.8377 416.5
N-117 N-116 416.2331 --na---na--na-416.2331 416.39
N-118 N-117 417.0631 -na--na---na-416.49 416.39
N-119 N-118 417.0166 -na--na---na-416.71 416.61
N-120 N-119 418.4399 --na----na----na-418.24 418.14
N-121 N-120 420.9399 --na----na---na-420.43 420.33
N-122 N-121 421.6109 -na---na--na-421.6109 422.69
N-123 N-122 434.4431 -na---na---na--423.41 423.31
N-124 N-123 426.0499 -na---na--na-423.41 423.31
N-125 N-124 423.6399 -na---na----na-423.6399 424.05
N-126 N-125 506.9789 -na--na---na-424.9 424.8
N-127 N-126 425.6399 -na--na--na-425.6399 426.02
N-128 N-127 426.0798 -na--na---na-426.0798 426.52
N-129 N-128 427.6098 -na--na---na-427.6097 428.27
N-130 N-129 429.6497 --na--na--na-429.4 429.3
N-131 N-130 · 430.9699 -na--na---na-430.83 430.73
N-132 N-131 432.5004 -na--na--na-432.5004 432.79
N-133 N-132 438.2302 -na---na----na-436.5 436.4
N-134 N-133 436.5119 -na--na--na-436.03 435.93
N-135 N-134 437.85 -na----na--na-437.57 437.47
N-136 N-135 440.3899 --na---na---na-440.25 440.15
N-137 N-136 444.7122 --na--na--na-442.2 442.1
N-137A N-137 442.8699 -na----na---na-441.99 441.89
N-138 N-137A 476.2553 -na---na--na-442.9 442.8
N-139 N-138 443.4986 -na--na--na-442.9 442.8
N-140 N-139 443.8899 --na----na--na-443.14 443.04
N-141 N-140 444.3999 --na---na--na-444.3999 444.84
N-142 N-141 446.0057 -na---na--na-446.0057 446.11
N-143 N-142 447.2256 --na----na--na-447.2256 447.71
N-144 N-143 455.4835 -na--na--na-448.2 448.1
N-145 N-144 448.46 -na--na--na-447.84 447.74
N-146 N-145 449.6399 -na--na--na-449.6399 449.84
N-147 N-146 452 .3699 --na--na--na-452.3698 452.71
N-148 N-147 453.5398 -na--na--na-453.5398 453.89
N-149 N-148 474.9647 -na--na--na-454.3 454.2
N-150 N-149 454.3029 -na--na--na-454.3029 454.65
N-151 N-150 456.4129 -na--na--na-455.87 455.77
N-152 N-151 460.5836 -na;_ -na--na-460.56 460.46
1-153 N-152 463.9726 -na---na---na-463.9726 464.17
.~-154 N-153 467.9025 -na--na--na-467.44 467.34
Table B.5. Hydrograph Routing -East Basin -100-Year Stonn
ROUTEHYD O THRU [Existing East] USING TYPE1A AND [100 yr] NOTZERO ACTUAL
Reach Area Flow Full Q % Full nDepth Size nVel Nel CBasin l Hyd
O-Dum2
O-Dum1
0-145
0-144
0-143
0-142
0-141
P-117
0-140
0-139
D-138
D-137
P-116
0-136
0-135
0-134
0-133A
0-133
P-115
0-132
P-114
0-131
0-130
0-129
P-113
0-128
D-127
D-126
D-125
0-124
D-123
P-112
D-122
0-121
P-111
D-120
0-119
0-118
0-117
D-116
0-115
P-110
0-114
0-113
'1-112
-111
ac cts ratio ft fl/s tus
19.7 7.1007 0.06 0.5932 X-Sect 4.5504 ----
53.6 20,334 0.17 1.0256 X-Sect 6.3154 --·--
53.6 20.3311 121.12 0.17 1.0311 X-Sect 6.2711 --
53.6 20.3274 117.92 0.17 1.2148 X-Sect 5.9225 -----
53.6 20.3204 122.41 0.17 1.1183 X-Sect 5.4519 ----
53.6 20.3129 82.3869 0.25 1.2157 X-Sect 4.9037 -
53.6 20.3094 1.95 -1 X-Sect 1.9538 --
e-001
e-002
65.2 22.46 • 3.41 -1 12· Diam 3.4132 8.3784 ex east
65.2 22.4518. 0.18 0.8802 X-Sect 4.6208 --
65.2 22.4372 117.81 0.19 0.8757 X-Sect 4.9419 ----
65.2 22.4229 0.24 1.1329 X-Sect 4.756 ---
67.6 23.3927 0.08 0.6862 X-Sect 7.4448 --e-003
67.6 23.3835 3.22 -1 18" Diam 3.2238 4.1046
67.6 23.3721 61.7242 0.38 1.2109X-Sect 5.1805----
67.6 23.3475 66.6905 0.35 1.4016 X-Sect 4.08 -
67.6 23.3353 70.9939 0.33 1.0244 X-Sect 5.0771 ----
67.6 23.3254 93.7984 0.25 1.0782 X-Sect 5.2133 --
67.6 23.3239 26.6671 0.87 2.4653 X-Sect 1.6511 --
68. 7 23.829 6.9473 3.43 -1 12" Diam 3.43 8.8456 e-004
68.7 23.8256 226.87 0.11 1.0347 X-Sect 7.9743 -
92.2 31.6894 18.9199 1.67 -1 24" Diam 1.6749 6.0224 e-005
92.2 31.6761 338.51 0.09 1.0378 X-Sect 6.9502 ---
92.2 31.6628 33.2703 0.95 1.5281 X-Sect 5.9813 --
92.2 31.6529 8.6723 3.65 -1 X-Sect 3.6499 ----
92.2 31.6395 23.5738 1.34 -1 18" Diam 1.3421 13.34
92.2 31.627 266.41 0.12 1.2034 X-Sect 6.1704 ----
92.2 31.5932 1354.11 0.02 0.8449 X-Sect 2.6909 -
92.2 31.5642 491.48 0.06 0.5117 X-Sect 2.2214 ----
92.2 31.4314 3470.27 0.01 0.541 X-Sect 1.1469 ----
92.2 31.2367 549.84 0.06 0.5301 X-Sect 0.8959 --
92.2 31.1967 3827.85 0.01 0.6298 X-Sect 2.5886 ---
92.2 31.1607 4.3371 7.18 -1 12" Diam 7.1847 5.5221
92.2 31.1444 50.2681 0.62 1.5106 X-Sect 3.8005 --
122.6 39.4139 594.02 0.07 0.527 X-Sect 15.3819 ----e-006
122.6 39.3717 15.3148 2.57 -1 18" Diam 2.5708 8.6664
122.6 39.1738 18.2879 2.14 ,1 X-Sect 2.1421 ----
122.6 39.0873 17.5281 2.23 -1 X-Sect 2.23 --
122.6 39.0705 179.94 0.22 0.7996 X-Sect 7.5336 .. ----
122.6 39.0498 61.1492 0.64 1.7492 X-Sect 4.2208 -
122.6 38.9434 27.9865 1.39 -1 X-Sect 1.3915 ---
122.6 38.9414 78.2241 0.5 2.0557 X-Sect 5.829 --
122.6 38.9219 30.6525 1.27 -1 24" Diam 1.2698 9.757
122.6 38.8904 47.75 0.81 1.8838 X-Sect 6.0508 ---
124.4 39.2371 319.76 0.12 1.298 X-Sect 8.3113 ---
124.4 39.225 1134.16 0.03 0.9129 X-Sect 8.7019 -
124.4 39.1846 413.21 0.09 1.4411 X-Sect 5.2991 ----
e-007
·1
D-110 124.4 39.1518 241.55 0.16 1.3552 X-Sect 5.6219 ---
Reh App Bend Junct HW Max El/
Loss Head Loss Loss Elev Rim El
Fr Node To Node ft ft ft ft ft ft
N-110 408.9452
N-111 N-110 409.8951 -na--na---na--409.8951 411.92
N-112 N-111 411.0111 -na---na----na-411.0111 414.13
N-113 N-112 412.691 -na--na----na--412.691 415.64
N-114 N-113 413.3009 --na---na----na--413.3009 415.67
N-115 N-114 415.03 --na--na--na-414.18 414.08
N-116 N-115 416.0292 -na--na--na-416.0292 416.5
N-117 N-116 416.3256 -na--na--na-416.3256 416.39
N-118 N-117 417.1555 -na---na--na-416.49 416.39
N-119 N-118 417.1629 -na---na---na-416.71 416.61
N-120 N-119 418.4399 -na---na---na-418.24 418.14
N-121 N-120 420.9399 --na----na---na--420.43 420.33
N-122 N-121 421.696 --na----na----na-421.696 422.69
N-123 N-122 437 .3544 --na---na----na--423.41 423.31
N-124 N-123 426.0499 -na--na---na--423.41 423.31
N-125 N-124 423.6805 --na----na----na-423.6805 424.05
· N-126 N-125 524.8533 -na---na---na-424.9 424.8
N-127 N-126 425.6399 -na----na---na-425.6399 426.02
N-128 N-127 426.0798 -na---na---na-426.0798 426.52
N-129 N-128 427.6098 -na--na---na-427.6097 428.27
N-130 N-129 429.6497 -na----na--na-429.4 429.3
N-131 N-130 430.9699 -na--na----na-430.83 430.73
N-132 N-131 432.5633 --na----na---na--432.5633 432.79
N-133 N-132 439.3671 -na---na----na-436.5 436.4
N-134 N-133 436.5119 --na---na---na--436.03 435.93
N-135 N-134 437.85 -na---na---na-437.57 437.47
N-136 N-135 440.3899 --na--na--na--440.25 440.15
N-137 N-136 445.4762 -na----na---na--442.2 442.1
N-137A N-137 442.8699 --na----na----na-441.99 441.89
N-138 N-137A 483.6605 -na--na---na--442.9 442.8
N-139 N-138 443.6152 -na---na--na-442.9 442.8
N-140 N-139 443.8899 -na--na----na--443.14 443.04
N-141 N-140 444.4243 -na----na----na-444.4243 444.84
N-142 N-141 446.0716 -na---na---na--446.0716 446.11
N-143 N-142 447.2915 -na----na---na-447.2915 447.71
N-144 N-143 457.2313 -na---na---na-448.2 448.1
N-145 N-144 448.4599 --na---na--na-447.84 447.74
N-146 N-145 449.6399 -na---na---na-449.6399 449.84
N-147 N-146 452.3698 -na--nas--na-452.3698 452.71
N-148 N-147 . 453.5398 -na---na--na-453.5398 453.89
N-149 N-148 479.5756 --na---na---na-454.3 454.2
N-150 N-149 454.3031 --na--na---na-454.3031 454.65
N-151 N-150 456.413 --na---na----na-455.87 455.77
N-.152 N-151 460.6481 -na-s -na---na--460.56 460.46
'1-153 N-152 464.0445 --na---na---na-464.0445 464.17
,-154 N-153 467 .9954 --na----na--na--467.44 467.34
Table B.6. Hydrograph Routing -East Basin -Summary Table
2-Year 10-Year 25-Year 50-Year 100-Year
Freeboard ·Freeboard Freeooard Freeboard Freeboard
Reach ID From Node To Node (FT} (FT) (FT) (FT) (FT)
N-110
D-110 N-111 N-110 2.68 2.33 2.17 2.10 2.02
D-111 N-112 N-111 4.16 3.43 3.27 3.19 3.12
D-112 N-113 N-112 3.98 3.26 3.10 3.02 2.95
D-113 N-114 N-113 3.14 2.69 2.52 2.44 2.37
D-114 N-115 N-114 Overtop Overtop Overtop Overtop Overtop
P-110 · N-116 N-115 1.00 Overtop Overtop 0.66 0.47
0-115 N-117 N-116 0.83 Overtop Overtop 0.16 0.06
D-116 N-118 N-117 0.00 Overtop Overtop Overtop Overtop
D-117 N-119 N-118 Overtop Overtop Overtop Overtop Overtop
D-118 N-120 N-119 Overtop Overtop Overtop Overtop Overtop
D-119 N-121 N-120 Overtop Overtop Overtop Overtop Overtop
D-120 N-122 N-121 1.17 1.36 1.17 1.08 0.99
P-111 N-123 N-122 0.32 Overtop Overtop Overtop Overtop
D-121 N-124 N-123 Overtop Overtop Overtop Overtop Overtop
D-122 N-125 N-124 0.41 0.41 0.41 0.41 0.37
P-112 N-126 N-125 Overtop Overtop Overtop Overtop Overtop
0-123 N-127 N-126 0.38 0.38 0.38 0.38 0.38
D-124 N-128 N-127 0.44 0.44 0.44 0.44 0.44
0-125 N-129 N-128 0.66 0.66 0.66 0.66 0.66
D-126 N-130 N-129 Overtop Overtop Overtop Overtop Overtop
0-127 N-131 N-130 Overtop Overtop Overtop Overtop Overtop
D-128 N-132 N-131 0.34 0.34 0.34 0.29 0.23
P-113 N-133 N-132 Overtop Overtop Overtop Overtop overtop
D-129 N-134 N-133 Overtop Overtop Overtop Overtop Overtop
D-130 N-135 N-134 Overtop Overtop Overtop Overtop Overtop
D-131 N-136 N-135 Overtop Overtop Overtop Overtop Overtop
P-114 N-137 N-136 0.68 Overtop Overtop Overtop Overtop
D-132 N-137A N-137 Overtop Overtop Overtop Overtop Overtop
P-115 N-138 N-137A Overtop Overtop Overtop Overtop Overtop
D-133 N-139 N-138 Overtop Overtop Overtop Overtop Overtop
D-133A N-140 N-139 Overtop Overtop Overtop Overtop OVertop
D-134 N-141 N-140 0.44 0.44 0.44 0.44 0.42
0-135 N-142 N-141 0.44 0.32 0.17 0.10 0.04
D-136 N-143 N-142 0.82 0.70 0.55 0.48 0.42
P-116 N-144 N-143 Overtop Overtop Overtop Overtop Overtop
0-137 N-145 N-144 Overtop OVertop Overtop Overtop Overtop
D-138 N-146 N-145 0.20 0.20 0.20 0.20 0.20
D-139 N-147 N-146 0.34 0.34 0.34 0.34 0.34
0-140 N-148 N-147 0.35 0.35 0.35 0.35 0.35
P-117 N-149 N-148 Overtop Overtop Overtop Overtop Overtop
D-141 N-150 N-149 0.35 0.35 0.35 0.35 0.35
D-142 N-151 N-150 Overtop Overtop Overtop Overtop Overtop
D-143 N-152 N-151 Overtop Overtop Overtop Overtop Overtop
D-144 N-153 N-152 0.28 0.28 0.27 0.20 0.13
D-145 N-154 N-153 Overtop Overtop Overtop Overtop Overtop
Table B.7. Hydrograph Routing -West Basin -2-Year Storm
ROUTEHYD O THRU [Existing West) USING TYPE1A AND [2 yr) NOTZERO ACTUAL.
Reach Area Flow Full Q % Full nDepth Size nVel Nel CBasin / Hyd
D-021
D-020
P-016
D-019
D-018
P-015
0-017
0-016
P-014
D-015
D-014
P-013
D-012
0-011
0-010
P-012
P-011
P-010
P-009
P-008A
P-008
P-007
P-006
P-005
P-004
D-009
0-008
P-003
0-007
D-006
P-002
D-005
0-004
D-003
D-002
D-001
P-001
ac cfs cfs ratio ft tus ft/s
2.9 0.5767 215.99 0 0.3321 X-Sect 3.0535 ---w-001
2.9 0.5766 75.0242 0.01 0.3244 X-Sect 2.7143 •••.•
19.2 2.8102 10.5228 0.27 0.3529 12'" Diam 11.3425 13.398 w-002
19.2 2.8096 212.76 0.01 0.6667 X-Sect 4.1816 -·-
21.1 3.0333 251 .93 0.01 0.2382 X-Sect 5.8108 --ex_west
21.1 3.0325 7.7298 0.39 0.4351 12" Diam 9.2462 9.8418
21.1 3.0318 138.18 0.02 0.3561 X-Sect 3.5277 --
21.1 3.0316 452.04 0.01 0.254 X-Sect 5.0894 -
22.3 3.2439 7.9881 0.41 0.4436 12" Diam 9.6423 10.1708 w-003
22.3 3.2432 160.64 0.02 0.451 X-Sect 3.7541 --
22.3 3.2429 200 0.02 0.6317 X-Sect 4.3238 --
22.3 3.2423 10.6228 0.31 0.3791 12" Diam 11.8787 13.5253
22.3 3.2413 290.67 0.01 0.6234 X-Sect 4.8101 -
22.3 3.2403 320.43 0.01 0.3609 X-Sect 4.0339 --
25.5 3. 7564 1040.88 0 0.5771 X-Sect 6.1421 ---w-004
25.5 3.7551 7.0631 0.53 0.5186 12'" Diam 9.1309 8.9931
25.5 3.7536 6.9402 0.54 0.5239 12" Diam 9.0097 8.8365
25.5 3.7521 8.217 0.46 0.4742 12" Diam 10.2249 10.4623
25.5 3.7507 7.6431 0.49 0.4945 12" Diam 9.6859 9.7315
27.7 4.1444 4.8684 0.85 0.709 12" Diam 6.9597 6.1986 w-005
31.5 4.8063 6.8722 0.7 0.6161 12" Diam 9.4657 8.75 w-006
31.5 4.8057 6.4104 0.75 0.6459 12" Diam 8.9569 8.162
31.5 4.8039 7.4569 0.64 0.5839 12" Diam 10.0875 9.4945
39.3 6.248 9.9629 0.63 0.574 12" Diam 13.3954 12.6852 w-007
39.3 6.2406 7.7824 0.8 0.6778 12" Diam 11.0133 9.9088
39.3 6.2233 93.993 0.07 0.6278 X-Sect 2.79 --
39.3 6.2231 112.96 0.06 0.414 X-Sect 6.2056 •••·•
39.3 6.2205 6.2952 0.99 0.8091 12" Diam 9.1373 8.0153
39.3 6.2079 107.57 0.06 0.5256 X-Sect 3.8357 --
39.3 6.2077 964.56 0.01 0.3936 X-Sect 8.1166 -
39.3 6.204 6.1462 1.01 0.8284 12" Diam 8.9179 7.8256
39.3 6.2035 --· 0 0.915 X-Sect 2.1497 ---
39.3 6.1864 44.3354 0.14 0.5256 X-Sect 4.8288 --
39.3 6.1853 313.41 0.02 0.5341 X-Sect 4.3358 -
39.3 6.1799 770.99 0.01 0.6454 X-Sect 1.5651 --
39.3 6.1797 146.32 0.04 0.4209 X-Sect 7.1705 ---
.48.3 6. 7994 8.2043 0.83 0.6946 12" Diam 11.6778 10.4461 w-008
Reh App Bend June! HW
Loss Head Loss Loss Elev
From Nod To Node ft ft ft ft ft
Max El/
Rim El
ft
N-002
N-003
'11-004
.~-005
N-001 373.6321
N-001 382.2466 -na-
N-002 381.0999 --na-'-
N-003 382.8899 --na--
N-004 389.8769 -na-
-na--
--na-
--na-
-na-
--na-
-na-
-na--
-na-
380.5
380.43
382.3
389.8769
380.4
380.33
382.2
390.25
' .,
N-006 N-005 398.3768 --na---na----na--398.3768 398.68
N-007 N-006 397. 7699 --na----na----na--397.7699 398.68
N-008 N-007 400.6486 --na----na----na-399.4 ·399.3
N-010 N-008 400.3799 --na----na----na--399.4 399.3
N-011 N-010 400.4899 --na---na----na-400.32 400.22
N-012 N-011 403.3211 --na---na----na--401.7 401.6
N-014 N-012 401.9299 --na----na----na-401.9 401.8
N-015 N-014 402.4099 --na----na----na--402.4099 402.6
N-016 N-015 406.8691 0.9827 0. 0089 ------405.8952 406.01
N-017 N-016 407.6445 0.5809 0.0075 ------406.41 406.31
N-018 N-017 408.2272 0.5814 0.0023 ----407.6481 408.14
N-019 N-018 411 . 1539 ------411.1539 413.72
N-019A N-019 419.722 0.4324 0.0032 --419.2928 420.68
N-020 N-019A 420.102 ---420.102 422.5
N-021 N-020 428.8048 0.3544 0.0039 --428.4543 429.85
N-022 N-021 431.8735 1.2605 0.0049 -----430.6179 434
N-023 N-022 435.9002 0.355 0.0013 ----435.5465 436.59
N-024 N-023 437.2402 --na----na----na--437.2402 438.2
N-025 N-024 437.6302 --na---na----na--437.6302 438.9
N-026 N-025 440.4301 --na----na----na--440.4301 441.52
N-028 N-026 444.3401 --na----na----na--444.3401 444.82
N-029 N-028 445.7641 --na---na----na-445.764 446.2
N-031 N-029 445.934 -na--na--na-445.934 446.47
N-032 N-031 447.8239 -na---na---na-447.8239 449.01
N-033 N-032 448.994 --na---na--na-448.994 450.1
N-035 N-033 449.4039 -na----na---na--449.4039 451.24
N-036 N-035 451.6238 -na--· --na---na-451.6238 452.98
N-037 N-036 452.5651 --na---na----na-452.5651 453.8
N-039 N-037 453.065 --na----na----na--453.065 454.27
N-040 N-039 455.835 --na----na----na--455.835 457.02
N-041 N-040 458.6864 --na----na---na-458.6864 459.3
N-043 N-041 458.8464 --na----na----na-458.8463 459.71
N-044 N-043 466. 1862 -na----na---na--466.1862 467.86
Table B.8. Hydrograph Routing -West Basin -10-Year Stonn
ROUTEHYD [] THRU [Existing West] USING TYPE1A AND [10 yr) NOTZERO ACTUAL
Reach Area Flow Full Q % Full nOepth Size nVel Nel CBasin / Hyd
D-021
D-020
P-016
D-019
D-018
P-015
D-017
D-016
P-014
D-015
D-014
P-013
0-012
D-011
D-010
P-012
P-011
P-010
P-009
P-008A
P-008
P-007
P-006
P-005
P-004
D-009
D-008
P-003
0-007
0-006
P-002
D-005
D-004
D-003
D-002
D-001
P-001
ac cfs cfs ratio ft ft/s ft/s
2.9 1.1262 215.99 0.01 0.4269 X-Sect 3.6099 --w-001
2.9 1.126 75.0242 0.02 0.417 X-Sect 3.2085 ---
19.2 5.7252 10.5228 0.54 0.5258 12" Diam 13.6802 13.398 w-002
19.2 5.7243 212.76 0.03 0.8706 X-Sect 4.9958 --
21.1 6.2369 251.93 0.02 0.3597 X-Sect 7.2932 -ex_west
21.1 6.2355 7.7298 0.81 0.6807 12" Diam 10.9508 9.8418
21.1 6.2346 138.18 0.05 0.5336 X-Sect 4.3923 -
21.1 6.2343 452.04 0.01 0.3664 X-Sect 6.4244 -
22.3 6.6546 7.9881 0.83 0.6973 12" Diam 11.3797 10.1708 w-003
22.3 6.6534 160.64 0.04 0.6285 X-Sect 4.6707 ----
22.3 6.653 200 0.03 0.827 X-Sect 5.1746 ---
22.3 6.652 10.6228 0.63 0.5735 12" Diam 14.2771 13.5253
22.3 6.6504 290.67 0.02 0.8162 X-Sect 5.757 --
22.3 6.6488 320.43 0.02 0.516 X-Sect 5.0632 -
25.5 7.6794 1040.88 0.01 0.7546 X-Sect 7.3444 ---w-004
25.5 7.6772 7.0631 1.09 -1 12" Diam 1.0869 8,9931
25.5 7.6747 6.9402 1.11 -1 12" Diam 1.1058 8.8365
25.5 7.6721 8.217 0.93 0.7657 12" Diam 11.8884 10.4623
25.5 7.6702 7.6431 1 0.8229 12" Diam 11.0927 9.7315
27.7 8.4447 4.8684 1.73 -112"Diam 1.7346 6.1986 w-005
31.5 9.6483 6.8722 1.4 -1 12" Diam 1 .404 8. 75 w-006
31.5 9.6459 6.4104 1.5 -1 12" Diam 1.5047 8.162
31.5 9.6425 7.4569 1.29 -1 12" Diam 1.2931 9.4945
39.3 12.2397 9.9629 1.23 -1 12· Diam 1.2285 12.6852 w-007
39.3 12.2337 7.7824 1.57 -1 12" Diam 1.572 9.9088
39.3 12.2305 93.993 0.13 0.867 X-Sect 3.43 --
39.3 12.2302 112.96 0.11 0.5807 X-Sect 7.6019 --
39.3 12.2269 6.2952 1.94 -1 12" Diam 1.9423 8.0153
39.3 12.2225 107.57 0.11 0.7439 X-Sect 4.7079 --
39.3 12.2223 964.56 0.01 0.5074 X-Sect 9.6143 ---
39.3 12.2172 6.1462 1.99 -1 12" Diam 1.9878 7.8256
39.3 12.2169 -0 0.915 X-Sect 4.2335 ----
39.3 12.207 44.3354 0.28 0.7349 X-Sect 5.8637 ---
39.3 12.1945 313.41 0.04 0.7226 X-Sect 5.3815 -
39.3 12.1624 770.99 0.02 0.7234 X-Sect 1.7335 -
39.3 12.1621 146.32 0.08 0.5527 X-Sect 8.9201 --
.48.3 13.7386 8.2043 1.67 -1 12" Diam 1.6746 10.4461 w-008
Reh
Loss
App
Head
From Nod To Node fl fl
Bend
Loss
fl
Junct
Loss
fl
HW
Elev
fl
Max EV
Rim El
fl
N-002
N-003
J-004
N-005
N-001
N-001
N-002
N-003
N-004
373.66
397.4953 -na-
381.0999 -na-
382.8899 -na-
390.363 --na--
-na---na--
-na--na-
-na--na--
-na----na-
380.5
380.43
382.3
390.35
380.4
380.33
382.2
390.25
•1
N-006 N-005 398.8499 --na----na----na--398.78 398.68
N-007 N-006 398.1499 --na----na----na--398.1499 398.68
N-008 N-007 406.7091 --na----na----na--399.4 .. 399.3
N-010 N-008 400.3799 --na----na----na--399.4 399.3
N-011 N-010 400.4899 --na----na----na--400.32 400.22
N-012 N-011 402.893 -'na----na---na--401.7 401.6
N-014 N-012 401. 9299 -na----na---na--401.9 401.8
N-015 N-014 402.4099 -na----na----na--402.4099 402.6
N-016 N-015 414.9783 3.7712 0. 0341 ------406.11 406.01
N-017 N-016 412.823 2.3405 0.0303 ------406.41 406.31
N-018 N-017 412.9798 2.3422 0.0092--408.24 408.14
N-019 N-018 421.5153-. 413.82 413.72
N-019A N-019 428.7839 1.7952 0.0134 ---420.78 420.68
N-020 N-019A 424.1394 --422.6 422.5
N-021 N-020 431.693 1.4817 0.0162 ------429.95 429.85
N-022 N-021 431.8735 1.4827 0.0057 -----· 430.3965 434
N-023 N-022 438.0848 1.4837 0.0053 ------436.69 436.59
N-024 N-023 440.4391 --na----na----na--438.3 438.2
N-025 N-024 438.69 --na--na----na--438.69 438.9
N-026 N-025 441 .4899 -na---na----na-441.4899 441.52
N-028 N-026 445.3998 --na----na----na--444.92 444.82
N-029 N-028 447.9408 .--na----na---na--446.3 446.2
N-031 N-029 446.47 --na---na----na-446.47 446.47
N-032 N-031 448.3599 --na--na--na-448.3599 449.01
N-033 N-032 451.1722 -na--na---na-450.2 450.1
N-035 N-033 450.6099 --na---na--na-450.6099 451.24
N-036 N-035 452.8299 --na---na---na-452.8299 452.98
N-037 N-036 454.9681 --na----na---na-453.9 453.8
N-039 N-037 454.3999 --na----na----na-454.37 454.27
N-040 N-039 457 .14 --na----na----na-457.12 457.02
N-041 N-040 460.2915 --na--na---na--459.4 459.3
N-043 N-041 459 .5599 --na---na----na--459.5599 459.71
N-044 N-043 466.8998 --na----na---na--466.8998 467.86
:,
Table B.9. Hydrograph Routing -West Basin -25-Year Storm
ROUTEHYD [] THRU [Existing West] USING TYPE1A AND [25 yr) NOTZERO ACTUAL
Reach Area Flow Full Q % Full nDepth Size nVel Nel CBasin / Hyd
D-021
0-020
P-016
D-019
D-018
P-015
D-017
0-016
P-014
D-015
D-014
P-013
D-012
0-011
D-010
P-012
P-011
P-010
P-009
P-008A
P-008
P-007
P-006
P-005
P-004
D-009
D-008
P-003
0-007
0-006
P-002
D-005
0-004
Dc003
D-002
D-001
P-001
ac cfs cfs ratio fl · · tus tus
2.9 1.4193 215.99 0.01 0.4655 X-Sect 3.8249 --w-001
2.9 1.419 75.0242 0.02 0.4548 X-Sect 3.3995 --
19.2 7.2941 10.5228 0.69 0.6125 12" Diam 14.4658 13.398 w-002
19.2 7.2903 212.76 0.03 0.9533 X-Sect 5.3071 ----
21.1 7.9622 251.93 0.03 0.4124X-Sect 7.8517----ex_west
21.1 7.9606 7.7298 1.03 0.8494 12" Diam 11.1952 9.8418
21.1 7.9596 138.18 0.06 0.6103 X-Sect 4.7161 -
21.1 7.9593 452.04 0.02 0.4154 X-Sect 6.9302-
22.3 8.4903 7.9881 1.06 0.8943 12" Diam 11.4571 10.1708 w-003
22.3 8.4889 160.64 0.05 0.7052 X-Sect 5.0142 -
22.3 8.4884 200 0.04 0.9062 X-Sect 5.4996 --
22.3 8.4872 10.6228 0.8 0.676 12" Diam 15.0227 13.5253
22.3 8.4854 290.67 0.03 0.8943 X-Sect 6.1186 ----
22.3 8.4835 320.43 0.03 0.5836 X-Sect 5.4511 ---·
25.5 9.7892 1040.88 0.01 0.8265 X-Sect 7.8039 ---w-004
25.5 9.7867 7.0631 1.39 -1 12" Diam 1.3856 8.9931
25.5 9.7842 6.9402 1.41 -1 12" Diam 1.4098 8.8365
25.5 9.7811 8.217 1.19 -1 12" Diam 1.1903 10.4623
25.5 9.7791 7.6431 1.28 -1 12" Diam 1.2795 9.7315
27.7 10.7564 4.8684 2.21 -1 12" Diam 2.2095 6.1986 w-005
31.5 12.2532 6.8722 1.78 -1 12"Diam 1.783 8.75 w-006
31.5 12.2295 6.4104 1.91 -1 12" Diam 1.9077 8.162
31.5 12.214 7.4569 1.64 -1 12" Diam 1.6379 9.4945
39.3 15.4537 9.9629 1.55 -1 12" Diam 1.5511 12.6852 w-007
39.3 15.439 7.7824 1.98 -1 12" Diam 1.9838 9.9088
39.3 15.4332 93.993 0.16 0.9703 X-Secl 3.6728 -
39.3 15.4329 112.96 0.14 0.6524 X-Sect 8.1307 ----
39.3 15.4277 6.2952 2.45 -1 12" Diam 2.4507 8.0153
39.3 15.4211 107.57 0.14 0.8378 X-Sect 5.0372 ---·
39.3 15.4209 964.56 0.02 0.5537 X-Sect 10.1896 -·
39.3 15.4136 6.1462 2.51 -1 12" Diam 2.5078 7.8256
39.3 15.4133 ---0 0.915 X-Sect 5.3412 --
39.3 15.3973 44.3354 0.35 0.8232 X-Sect 6.2522 ----
39.3 15.3784 313.41 0.05 0.8043 X-Sect 5.7771 --
39.3 15.3305 770.99 0.02 0.749 X-Sect 1.8482 --
39.3 15.3302 146.32 0.1 0.61 X-Sect 9,5841 --
48.3 17.4789 8.2043 2.13 -1 12" Diam 2.1304 10.4461 w-008
Reh
Loss
Max El/ ·
Rim El
From Nod To Node fl
App
Head
fl
Bend
Loss
fl
June!
Loss
fl
HW
Elev
fl fl
N-002
N-003
N-004
N-005
N-001
N-001
N-002
N-003
N-004
373.66
412.2399 --na--
381.1 --na-
382.8899 -na-
390.6017 -na-
-na--
--na-
-na,-
--na--
--na--
-na-
-na-
-na-
380.5
380.43
382.3
390.35
380.4
380.33
382.2
390.25
,
.'1
N-006 N-005 398.85 --na----na---na-398.78 398.68
N-007 N-006 398.1499 --na----na----na-398.1499 398.68
N-008 N-007 411. 7735 --na----na----na-399.4 399.3
N-010 N-008 400.3799 --na----na----na--399.4 399.3 ..
N-011 N-010 400.4899 --na---:na----na--400.32 400.22
N-012 N-011 404.2625 --na----na-~ --na--401.7 401.6
N-014 N-012 401.9299 --na---na----na-401.9 401.8
N-015 N-014 402.4099 --na----na----na--402.4099 402.6
N-016 N-015 422.4271 6.0118 0. 0544 ------406.11 406.01
N-017 N-016 416.8114 3.7554 0. 0486 ------406.41 406.31
N-018 N-017 416.9514 3.7649 0.0148 --408.24 408.14
Ns019 N-018 429.5789 ----413.82 413.72
N-019A N-019 437.9548 2.9125 0.0218 ---420.78 420.68
N-020 N-019A 426.2303--422.6 422.5
N-021 N-020 436.8487 2.4083 0.0264 -----429.95 429.85
N-022 N-021 438.8036 2.4098 0. 0093 ------434.1 434
N-023 N-022 442.3643 2.4111 0.0087 --436.69 436.59
N-024 N-023 442.7826 --na----na----na--438.3 438.2
N,025 N-024 438.69 --na----na----na--438.69 438.9
N-026 N-025 441.4899 -na----na----na-441.4899 441.52
N-028 N-026 445.3998 --ria----na----na--444.92 444.82
N-029 N-028 449. 7335 --na----na----na-446.3 446.2
N-031 N-029 446. 4 7 --na----na--na--446.47 446.47
N-032 N-031 448.3599 --na----na---na--448.3599 449.01
N-033 N-032 452.966 -na---na--na-450.2 450.1
N-035 N-033 450.6099 --na---na---na-450.6099 451.24
N-036 N-035 452.8299 -na---na---na-452.8299 452.98
N-037 N-036 456.3148 -na---na--na-453.9 453.8
N-039 N-037 454.3999 -na----na--na--454.37 454.27
N-040 N-039 457.1399 --na----na---na--457.12 457.02
N-041 N-040 461.6094 -na----na----na-459.4 459.3
N-043 N-041 459.5599 -na----na--na-459.5599 459.71
N-044 N-043 466.8998 --na---na----na--466.8998 467.86
)
Table 8.10. Hydrograph Routing -West Basin -50-Year Stonn
ROUTEHYD [] THRU [Existing West) USING TYP!=1A AND [50 yr] NOTZERO ACTUAL
Reach Area Flow Full Q % Full nDepth Size nVel Nel CBasin / Hyd
D-021
D-020
P-016
D-019
D-018
P-015
D-017
D-016
P-014
D-015
D-014
P-013
D-012
D-011
D-010
P-012
P-011
P-010
P-009
P-008A
P-008
P-007
P-006
P-005
P-004
D-009
D-008
P-003
D-007
D-006
P-002
D-005
D-004
D-003
D-002
D-001
P-001
ac els els ratio ft · · fUs fUs
2.9 1.5685 215.99 0.01 0.4833 X-Sect 3.9215 ---w-001
2.9 1.5683 75.0242 0.02 0.4722 X-Sect 3.4853 ---
19.2 8.0999 10.5228 0.77 0.6581 12' Diam 14.7787 13.398 w-002
19.2 8.0896 212.76 0.04 0.9912 X-Sect 5.4469 ---
21.1 8.8435 251.93 0.04 0.4372 X-Sect 8.1008---ex_west
21.1 8.8417 7.7298 1.14 -1 12" Diam 1.1439 9.8418
21.1 8.8407 138.18 0.06 0.6463 X-Sect 4.8603 --
21.1 8.8404 452.04 0.02 0.4384 X-Sect 7.156 ---
22.3 9.434 7.9881 1.18 -1 12"Diam 1.181 10.1708 w-003
22.3 9.4262 160.64 0.06 0.7412 X-Sect 5.1673 --
22.3 9.4257 200 0.05 0.9425 X-Sect 5.6454 ----
22.3 9.4245 10.6228 0.89 0.7329 12" Diam 15.2781 13.5253
22.3 9.4224 290.67 0.03 0.9301 X-Sect 6.2809 ----
22.3 9.4204 320.43 0.03 0.6154 X-Sect 5.6241 ---
25.5 10.8663 1040.88 0.01 0.8595 X-Sect 8.0101 -w-004
25.5 10.8659 7.0631 1.54 -1 12" Diam 1.5384 8.9931
25.5 10.8622 6.9402 1.57 -1 12" Diam 1.5651 8.8365
25.5 10.8581 8.217 1.32 -1 12" Diam 1.3214 10.4623
25.5 10.8544 7.6431 1.42 -1 12" Diam 1.4201 9.7315
27.7 11.9326 4.8684 2.45 -1 12" Diam 2.4511 6.1986 w-005
31.5 13.5621 6,8722 1.97 -1 12' Diam 1.9735 8.75 w-006
31.5 13.5297 6.4104 2.11 -112"Diam 2.1106 8.162
31.5 13.5123 7.4569 1.81 -1 12" Diam 1.8121 9.4945
39.3 17.0801 9.9629 1.71 -1 12" Diam 1.7144 12.6852 w-007
39.3 17.0634 7.7824 2.19 -1 12" Diam 2.1926 9.9088
39.3 17.0568 93.993 0.18 1.0185 X-Sect 3.7809 --
39.3 17.0564 112.96 0.15 0.6858 X-Sect 8.366 -
39.3 17.0509 6.2952 2.71 -1 12" Diam 2.7086 8.0153
39.3 17.0435 107.57 0.16 0.8816 X-Sect 5.1838 ----
39.3 17.0432 964.56 0.02 0.5748 X-Sect 10.4477 --
39.3 17.0355 6.1462 2.77 -1 12' Diam 2.7717 7.1!256
39.3 17.0353 --0 0.915 X-Sect 5.9032 -
39.3 17.0172 44.3354 0.38 0.8642 X-Sect 6.4254 -
39.3 16.9961 313.41 0.05 0.8428 X-Sect 5.9539 --
39.3 16.9427 770.99 0.02 0.7591 X-Sect 1.9232 -
39.3 16.9424 146.32 0.12 0.6369 X-Sect 9.8817 --
48.3 19.3916 8.2043 2.36 -1 12" Diam 2.3636 10.4461 w-008
Reh
Loss
From Nod To Node fl
App
Head
fl
Bend
Loss
fl
Junct -
LOSS
fl
HW
Elev
fl
Max El/
Rim El
fl
N-002
N-003
N-004
N-005
N-001
N-001
N-002
N-003
N-004
373.66
421.1453 -na--
381.1 -na--
382.8899 -na-
390.6621 --na-
-na---na-
-na---na-
-na--na-
-na--na-
380.5
380.43
382.3
390.35
380.4
380.33
382.2
390.25
N-006 N-005 398.8499 --na----na----na--398.78 398.68
N-007 N-006 398.1499 --na--na----na--398.1499 398.68
N-008 N-007 414.7916 --na----na-, ·--na--399.4 ·399.3
N-010 N-008 400.3799 --na----na--.--na--399.4 399.3
N-011 N-010 400.5191 --na----na----na--400.32 400.22
N-012 N-011 405.0781 --na----na----na--401.7 401.6
N-014 N-012 401.9299 --na----na----na--401.9 401.8
N-015 N-014 402.4099 --na----na----na--402.4099 402.6
N-016 N-015 426.8611 7.3437 0.0665 -----406.11 406.01
N-017 N-016 419.1824 4.5962 0.0595 ----406.41 406.31
N-018 N-017 419.3115 4.6079 0.0181 -408.24 408.14
N-019 N-018 434.3575 ---. 413.82 413.72
N-019A N-019 443.3864 3.5843 0.0268 ----420.78 420.68
N-020 N-019A 427 .4875 ----422.6 422.5
N-021 N-020 440.1545 2.9679 0. 0325 ------429.95 429.85
N-022 N-021 440.8607 2.9701 0.0115 ------434.1 434
N-023 N-022 444.2857 2.9721 0.0107 ---436.69 436.59
N-024 N-023 444.2004 --na----na----na--438.3 438.2
N-025 N-024 438.6899 --na---na----na--438.6899 438.9
N-026 N-025 441.4899 -na---na---na--441.4899 441.52
N-028 N-026 445.3998 -na----na----na--444.92 444.82
N-029 N-028 450.8166 -na--na----na--446.3 446.2
N-031 N-029 446.47 -na---na----na--446.47 446.47
N-032 N-031 448.3599 -na--na---na--448.3599 449.01
N-033 N-032 453.324 -na--na---na-450.2 450.1
~-035 N-033 450.6099 -na---na----na-450.6099 451.24
N-036 N-035 452.8299 --na----na----na-452.8299 452.98
N-037 N-036 457.129 --na----na----na--453.9 453.8
N-039 N-037 454.3999 --na----na----na--454.37 454.27
N-040 N-039 457.1399 --na---na----na-457.12 457.02
N-041 N-040 462.4097 --na----na----na-459.4 459.3
N-043 N-041 459.5599 --na--na----na--459.5599 459.71
N-044 N-043 466.8998 --na----na----na--466.8998 467.86
Table 8.11. Hydrograph Routing -West Basin -100-Year Stonn
ROUTEHYD O THRU [Existing West] USING TYPE1A AND [100 yr] NOTZERO ACTUAL
Reach Area Flow Full Q % Full nDepth Size nVel Nel CBasin / Hyd
D-021
D-020
P-016
D-019
D-018
P-015
D-017
D-016
P-014
D-015
D-014
P-013
D-012
D-011
D-010
P-012
P-011
P-010
P-009
P-008A
P-008
P-007
P-006
P-005
P-004
D-009
D-008
P-003
0-007
0-006
P-002
D-005
D-004
D-003
0-002
0-001
P-001
ac cfs cfs ratio ft ft/s fl/s
2.9 1.7191 215.99 0.01 0.5002 X-Sect 4.0124 ---w-001
2.9 1.7188 75.0242 0.02 0.4887-X-Sect 3.5662 ---
19.2 8.9147 10.5228 0.85 0.7064 12" Diam 15.0315 13.398 w-002
19.2 8.8982 212.76 0.04 1.0272 X-Sect 5.5783 ----
21.1 9.7341 251.93 0.04 0.4611 X-Sect 8.3334 ---ex_west
21.1 9.7323 7.7298 1.26 -1 12" Diam 1.2591 9.8418
21.1 9.7313 138.18 0.07 0.6809 X-Sect 4.9949 -
21.1 9.7309 452.04 0.02 0.4605 X-Sect 7.3672 -
22.3 10.3918 7.9881 1.3 -1 12" Diam 1.3009 10,1708 w-003
22.3 10.3745 160.64 0.06 0.7757 X-Sect 5.3102 ---
22.3 10.3736 200 0.05 0.977 X-Sect 5.7823 --
22.3 10.3718 10.6228 0.98 0.7991 12" Diam 15.4151 13.5253
22.3 10.3694 290.67 0.04 0.9642 X-Sect 6.4331 ----
22.3 10.3672 320.43 0.03 0.6459 X-Sect 5.7856 ---
25.5 11.9547 1040.88 0.01 0.8908 X-Sect 8.2036 -w-004
25.5 11.9546 7.0631 1.69 -1 12" Diam 1.6925 8.9931
25.5 11.9518 6.9402 1.72 -1 12" Diam 1.7221 8.8365
25.5 11.9391 8.217 1.45 -1 12" Diam 1.453 10.4623
25.5 11.8994 7 .6431 1.56 -1 12" Diam 1.5569 9.7315
27.7 13.0768 4.8684 2.69 -1 12" Diam 2.6861 6.1986 w-005
31.5 14.8216 6.8722 2.16 -1 12" Diam 2.1567 8.75 w-006
31.5 14.7641 6.4104 2.3 -1 12" Diam 2.3031 8.162
31.5 14.7397 7.4569 1.98 -1 12" Diam 1.9766 9.4945
39.3 18.6376 9.9629 1.87 -1 12" Diam 1.8707 12.6852 w-007
39.3 18.6131 7.7824 2.39 -1 12" Diam 2.3917 9.9088
39.3 18.6037 93.993 0.2 1.0612 X-Sect 3.8828 -
39.3 18.6034 112.96 0.16 0.7161 X-Sect 8.5744 -
39.3 18.5959 6.2952 2.95 -1 12" Diam 2.954 8.0153
39.3 18.5866 107.57 0.17 0.9214 X-Sect 5.3133 -
39.3 18.5863 964.56 0.02 0.5938 X-Sect 10.6766 --
39.3 18.5762 6.1462 3.02 -1 12" Diam 3.0224 7.8256
39.3 18.576 --0 0.915 X-Sect 6.4371 -----
39.3 18.5514 44.3354 0.42 0.9012 X-Sect 6.5778 -
39.3 18.5234 313.41 0.06 0.8774 X-Sect 6.1089 ---
39.3 18.4536 770.99 0.02 0.7682 X-Sect 1.9897 --
39.3 18.4532 146.32 0.13 0.6611 X-Sect 10.141 ---
48.3 21.1994 8.2043 2.58 -1 12" Diam 2.5839 10.4461 w-008
Reh
Loss
From Nod To Node fl
App
Head
fl
Bend
LOSS
fl
Junct
Loss
fl
HW
Elev
fl
Max El/
Rim El
fl
N-002
N-003
N-004
N-005
N-001
N-001
N-002
N-003
N-004
373.66
430.4121 --na--
381.0999 -na~-
382.8899--na--
390.6975 -na-
-na-
-na-
-na-
-na-
--na--
--na-
--na0 -
-na-
380.5
380.43
382.3
390.35
380.4
380.33
382.2
390.25
.·l
N-006 N-005 398.8499 -na---na----na-398.78 398.68
N-007 N-006 398.1499 -na----na----na--398.1499 398.68
N-008 N-007 417.9379 --na----.na----na--399.4 399.3
N-010 N-008 400.3799 --na----na--. --na--399.4 . 399.3
N-011 N-010 400.5711 --na----na--.--na--400.32 400.22
N-012 N-011 405.9302 --na----na----na--401.7 401.6
N-014 N-012 401.9299 -na----na----na--401.9 401.8
N-015 NC014 402.4099 --na--. --na---na--402.4099 402.6
N-016 N-015 431.5039 8.7441 . 0.0791 -----406.11 406.01
N-017 N-016 421.6752 5.469 0.0707 --406.41 406.31
N-018 N-017 421.7617 5.4872 0.0216-408.24 408.14
N-019 N-018 439.3409 --. 413.82 . 413.72
N-019A N.019 449.133 4.3046 0.0322--420.78 420.68
N-020 N-019A 428.8355-422.6 422.5
N-021 N-020 443.6975 3.5882 0.0393 ---429.95 429.85
N-022 N-021 443.1411 3.5959 0.0139 ----434.1 434
N-023 N-022 446.4317 3.5976 0.0129 -----436.69 436.59
N-024 N-023 445. 7808 --na---na----na--438.3 438.2
N-025 N-024 438.6899 --na----na---na--438.6899 438.9
N-026 N-025 441.4899 -na----na----na-441.4899 441.52
N-028 N-026 445.3998 --na----na---na--444.92 444.82
N-029 N-028 452.0266 --na---na----na-446.3 446.2
N-031 N-029 446.47 -na---na---na-446.47 446.47
N-032 N-031 448 .3599 --na--na--na-448.3599 449.01
N-033 N,032 454.3832 -na---na---na-450.2 450.1
.~-035 N-033 450.6099 -na--na---na-450.6099 451.24
N-036 N-035 452.8299 -na--na-· -na-452.8299 452:98
N-037 N-036 458.0387 -na--na----na--453.9 453.8
N-039 N-037 454 .3999 --na----na----na-454.37 454.27
N-040 N-039 457 .1399 --na----na----na-457.12 457.02
N-041 N-040 463.3042 --na----na--na-459.4 459.3
N-043 N-041 459.5599 -na----na---na-459.5599 459.71
N-044 N-043 466.8998 -na----na----na-466.8998 467.86
.,
) Table 8.12. Hydrograph Routing -West Basin -Summary Table
2-Year 10-Year 25-Year SO-Year 100-Year
Freeboard Freeboard Freeboard Freeboard Freeboard
Reach ID From Node To Node ft ft ft ft ft
N-001
P-001 N-002 N-001 Overtop Overtop Overtop Overtop Overtop
D-001 N-003 N-002 Overtop Overtop Overtop Overtop Overtop
D-002 N-004 N-003 Overtop Overtop Overtop Overtop Overtop
·D-003 N-005 N-004 0.37 Overtop Overtop Overtop Overtop
D-004 N-006 N-005 0.30 Overtop Overtop Overtop Overtop
D-005 N-007 N-006 0.91 0.53 0.53 0.53 0.53
P-002 N-008 N-007 Overtop Overtop Overtop Overtop Overtop
D-006 N-010 N-008 Overtop Overtop Overtop Overtop Overtop
D-007 N-011 Ns010 Overtop Overtop Overtop Overtop Overtop
P-003 N-012 N-011-Overtop Overtop Overtop Overtop Overtop
D-008 N-014 N-012 Overtop Overtop Overtop Overtop· Overtop
D-009 N-015 N-014 0.19 0.19 0.19 0.19 0.19
P-004 N-016 N-015 0.11 Overtop Overtop Overtop Overtop
P-005 N-017 N-016 Overtop Overtop Overtop Overtop Overtop
P-006 N-018 N-017 0.49 Overtop Overtop Overtop Overtop
P-007 N-019 N-018 2.57 Overtop Overtop Overtop Overtop
P-008 N-019A N-019 1.39 Overtop Overtop Overtop Overtop
P-008A N-020 N-019A 2.40 Overtop Overtop Overtop Overtop
P-009 N-021 N-020 1.40 Overtop Overtop Overtop Overtop
P-010 N-022 N-021 3.38 3.60 Overtop Overtop Overtop
P-011 N-023 N-022 1.04 Overtop Overtop Overtop Overtop
P-012 N-024 N-023 0.96 Overtop Overtop Overtop Overtop
D-010 N-025 N-024 1.27 0.21 0.21 0.21 0.21
D-011 N-026 N-025 1.09 0.03 0.03 0.03 0.03
D-012 N-028 N-026 0.48 Overtop Overtop Overtop Overtop
P-013 N-029 N-028 0.44 Overtop Overtop Overtop Overtop
D-014 N-031 N-029 0.54 0.00 0.00 0.00 0.00
D-015 N-032 N-031 1.19 0.65 0.65 0.65 0.65
P-014 N-033 N-032 1.11 Overtop Overtop Overtop Overtop
D-016 N-035 N-033 1.84 0.63 0.63 0.63 0.63
D-017 N-036 N-035 1.36 0.15 0.15 0.15 0.15
P-015 . N-037 N-036 1.23 Overtop Overtop Overtop Overtop
D-018 N-039 N-037 1.20 Overtop Overtop Overtop Overtop
D-019 N-040 N-039 1.19 Overtop Overtop Overtop Overtop
P-016 N-041 N-040 0.61 Overtop Overtop Overtop Overtop
D-020 N-043 N-041 0.86 0.15. 0.15 0.15 0.15
D-021 N-044 N-043 1.67 0.96 0.96 0.96 0.96
)
'
Subsurface Explorat/<m
and Preliminary Geotechnical Engineering Report
. EVENDELL PRELIMINARY PLAT
,King County, Washington
Prepared for
U.S. Land Development Associates
·· Pn;iject No. K.EOI617 A
· November 16, 2001
)
Associated Earth Sciences, Inc.
November 16, 2001
Project No. KE01617A
U.S. Land Development Associates
c/o Centurion Development Services
22617 gm Drive SE
Bothell, _Washington 98021
Attention: Mr. Mike Romano
Subject: · Subsurface Exploration and
Preliminary Geotechnical Engineering .Report
Evendell Preliminary Plat
SE Renton-Issaquah Road (SR 900) and 148m A venue SE ·
King County, Washington
De<1r Mr. Rg_mano:
We are pleased to present the enclosed copies of the above-referenced report.· This report-
. summarizes the results of our subsurface exploration and geotechnical engineering study, and
offers preliminary recommendations for design and development of the proposed project. We ·
have enjoyed working with you on 'this study and are confident that the recommendations
presented in this report will aid m a successful completion of your project. lf you should have
any questions or if we can be. of additional help to you; please do not hesitate to call.
Sincerely,
ASSOCIATED EARTH SCIENCES, INC.
Kirkland, Washington ·
Bruce LBlyto~·
Principal Engineer
BLB/d;i -KED1617A I -Projc:cts\2001617\KE\WP -W:!K I
91 J Fifth Avenue. Suite 100 • Kirkland, WA 98033 • Phone 425 827-770 I • Fax 425 827-S424
,·
SUBSURFACE EXPLORATION AND·
PRELIMINARY GEOTECHNICAL ENGINEERING REPORT
EVENDELLPRELIMINARYPLAT
King County, Washington
Prepared for:
U.S. Land Development Associates
c/o Centurion Development Services
22617 8 .. Drive SE
Bothell, Washington 98021
Prepared by:
Associated Earth Sciences, Inc.
911 5m Avenue, Suite 100
Kirkland, Washington 98033
425-827-7701
Fax: 425-827-5424
November 16, 2001
Project No. KE0!617A
Evendel/ Preliminary Plat
King County, Washington
Subsurface Exploration and
Preliminary Geotechnical Engineering Repon
Project and Site Conditions
I. PROJECT AND SITE CONDITIONS
1.0 INTRODUCTION
This report presents the results of our subsurface exploration and preliminary geotechnical
engineering study for the proposed Evendell Preliminary Plat located at the intersection of SE
136111 Street and 160m Avenue SE in King County, Washington (Figure !). The approximate
locations of the explorations completed for this study are presented on the Site and Exploration
Plan, Figure 2.
I. I Purpose and Scope
The purpose of this study was to provide subsurface data to be used in the preliminary design
and development of the above-mentioned project. Our study included reviewing available
geologic literature, excavating exploration pits, and performing geologic studies to assess the
type, thickness, distribution, and physical properties of the subsurface soils and shallow
ground water conditions. Geotechnical engineering studies were also conducted to determine
the type of suitable foundation, allowable bearing pressures, anticipated settlements, floor
support recommendations, and drainage considerations. This report summarizes our current
fieldwork and offers development recommendations based on our present understanding of the
project.
1.2 Authorization
Authorization to proceed with this study was granted by Mr. Mike Romano of Centurion
Development Services on behalf of U.S. Land Development Associates. Our study was
accomplished in general accordance with our scope of work letter dated September 24, 2001.
This report has been prepared for the exclusive use of U.S. Land Development Associates and
their agents, for specific application to this project. Within the limitations of scope, schedule,
and budget, our services have been performed in accordance with generally accepted
geotechnical engineering and engineering geology practices in effect in this area at the time our
report was prepared. No other warranty, express or implied, is made.
2.0 PROJECT AND SITE DESCRJPTION
Our understanding of the proposed project is based on our discussions with Centurion
Development Services, and on a plan sheet titled Plat of Evendell, dated May 20, 2001. The
proposed project would include construction of a new plat. The new plat would include 75
new detached, single-family home sites, a recreation tract, two surface water detention tracts,
and an existing area that has been identified as a wetland area that will remain. New paved
November 16, 2001 ASSOCIATED EARTH SCIENCES., INC.
MAMlda -KE0/617AI -Projt!Cls\100/6/7\KE\WP-W2K Page I
Evendell Preliminary Plat
King County, Washington
Subswface Exploration and
Preliminary Geotechnica/ Engineering Repon
Project and Site Conditions
access roads, buried utilities, and other typical improvements are also planned. At the time
this report was prepared, no grading plans were available; however, we assume that most of
the project will be built near existing grades, without large excavation cuts or structural fills: . ·
Preliminary plat plans call for an open detention pond in the south detention tract, and a buried
detention vault in the west detention tract.
The project site is irregularly shaped, and approximately 12.4 acres in total area. The site is
bordered to the north by SE 136<h Street, to the west by I60<h Avenue SE, and to the south and
west by existing residential development. Overall vertical relief across the site is on the order
of 35 feet, and areas in excess of 15 percent slope are not present, based on topographic
information on the previously referenced plan sheet. No surface water was observed on site
during our subsurface exploration. At the time of our field study, site vegetation consisted of
mature evergreen and deciduous trees, with moderately dense undergrowth, pasture on the
west and south parts of the site, and landscaping around the existing house on the north central
part of the site. A wetland, mapped by others, was located in the northeast corner of the site.
Existing site development included a home with outbuildings on the north central part of the
site, a fenced pasture and several outbuildings on th.e west part of the site, and a fenced pasture
on the south edge of the site. The existing house on the north central part of the site has an
existing septic drainfield southwest of the house.
3.0 SUBSURFACE EXPLORATION
Our field study included excavating 12 exploration pits to gain information about the site. The
various types of sediments, as well as the depths where characteristics of the sediments
changed, are indicated on the exploration logs presented in the Appendix. The depths
indicated on the logs where conditions changed may represent gradational variations between
sediment types in the field. Our explorations were approximately located in the field by
measuring from known site features shown on the previously referenced site plan.
The conclusions and recommendations presented in this report are based on the 12 exploration
pits completed for this study. The number, location, and depth of the explorations were
completed within site and budgetary constraints. Because of the nature of exploratory work
below ground, extrapolation of subsurface conditions between field explorations is necessary.
It should be noted that differing subsurface conditions may sometimes be present due to the
random nature of deposition and the alteration of topography by past grading and/or filling.
Existing fill should be expected around the existing buildings and drainfield. The nature and
extent of any variations between the field explorations may not become fully evident until
construction. If variations are observed at that time, it may be necessary to re-evaluate specific
recommendations in this report and make appropriate changes.
November 16, 2001 ASSOCIATED EARTH SCIENCES, INC.
MAM!da -K£0/6/7AI -Projms\200/6/71K£l\VP-w.?K Page 2
Evendell Preliminary Plat
King County, Washington
3 .1 Exploration Pits
Subsurface Exploration and
Preliminary Geotechnica/ Engineering Repon
Projeet and Site Conditions
Exploration pits were excavated with a track-mounted backhoe. The pits permitted direct,
visual observation of subsurface conditions. Materials encountered in the exploration pits were
studied and classified in the field by a geologist from our firm. All exploration pits were
backfilled immediately after examination and logging. Selected samples were then transported
to our laboratory for further visual classification and testing, as necessary.
4.0 SUBSURFACE CONDITIONS
Subsurface conditions on the parcel were inferred from the field explorations accomplished for
this study and a visual reconnaissance of the site. As shown on the field logs, the exploration
holes generally encountered medium dense grading to very dense, silty sand with gravel
interpreted as lodgment till. Topsoil thickness observed in our exploration pits varied from a
minimum of approximately 0.5 foot to 1.2 feet.
4.1 Stratigraphy
Natural soils observed in our exploration pits consisted of silty sand with gravel, trace cobbles,
and trace boulders interpreted as lodgment till. The till was observed to be loose to medium
dense at the ground surface, and progressively more dense with increasing depth below the
ground surface. The till was typically dense to very dense below approximately 5 feet in
depth. The color of the till soils typically graded from brown near the ground surface, to
mottled gray at a depth of 2 feet to 5 feet, to gray below approximately 5 feet.
Lodgment till was deposited at the base of an active continental glacier, and was compacted by
the weight of the overlying glacial ice. Till typically has high strength and low compressibility
characteristics, and .is considered suitable for structural support with proper preparation. Till
sediments typically contain a significant amount of silt, and are considered moisture sensitive.
Moisture sensitive soils are prone to disturbance when wet, and typically perform best in
construction applications when dry site and weather conditions prevail.
Our interpretations of subsurface conditions are consistent with published information sources,
as represented by the Washington State Department of Water Resources Water Supply Bulletin
28, Plate I, Geologic Map of Southwestern King County, Washington. This map indicates that
the site is underlain by lodgement till.
Although not encountered in our exploration pits, disturbed/fill soil is present, adjacent to the
existing structures on the site and around any underground utilities. This non-structural fill is
not considered to be suitable for foundation support.
November 16, 2001 ASSOCIATED EARTH SCIENCES. INC.
MAMlda -KEOJ617rll -Projrcu1200/617\X£1WP -\Al.:?K Page 3
Evende/l Preliminary Plat
King County, Washington
4.2 Hydrology
Subswface Exploration and
Preliminary Geotechnica/ Engineering Report
Project and Site Conditions
Ground water seepage was encountered in exploration pit EP 0 8 near the interface between
weathered till and till sediments. Wet soil conditions were also observed in exploration pit EP-
12 near the interface between weathered till and till sediments at a depth of 8 feet, though no
free ground water was observed. The observed ground water conditions are interpreted to
represent a perched ground water condition where vertical infiltration of surface water is.
impeded by lower permeability soils at depths. Ground water conditions should be expected to
vary with changes in season, weather, on-and off-site land usage, and other factors.
November 16, 2001 ASSOCIATED EARm SCIENCES. INC.
MAM/do. -KE0/617Al -Projws1200/6171KE\WP-W2K Page 4
Evende/1 Preliminnry Plat
King County, Washington
Subsurface Exploration and
Preliminary Geotechnical Engineering Repon
Design Recommendations
II. DESIGN RECOMMENDATIONS
5.0 INTRODUCTION
Our exploration indicates that from a geotechJ;iical standpoint, the parcel is suitable for the
proposed development provided the recommendations contained herein are properly followed.
The bearing stratum of dense lodgement till is located at approximately 1 foot to 2 feet below
existing grades. Conventional spread footing foundations that bear on the medium dense
lodgement till may be used for building support.
6.0 EROSION HAZARDS AND MITIGATION
To mitigate and reduce the erosion hazard potential and off-site soil transport, we recommend
the following:
1) All storm water from impermeable surfaces should be tightlined into approved
storm water drainage systems or temporary storage.
2) Silt fences should be placed along the lower elevations of cleared and disturbed
areas on the site. ·
3) Construction should proceed during the drier periods of the year or temporary
erosion and sediment control plans should be developed if construction is to
proceed during the winter months. Disturbed areas should be revegetated as
soon as possible.
4) Soils that are to be reused around the site should be stored in such a manner as
to reduce erosion. Protective measures may include, but are not necessarily
limited to, covering with plastic sheeting or the use of hay bales/silt fences.
7.0 SITE PREPARATION
Old foundations presently on the site that are under building areas or not part of future plans
should be removed. Any buried utilities should be removed or relocated if they are under
building areas. The resulting depressions should be backfilled with structural fill as discussed
under the Structural Fill section.
Site preparation of planned building and road areas should include removal of all trees, brush,
debris, and any other deleterious material. Additionally, the upper organic topsoil and any fill
. November 16, 2001 ASSOCIATED EARTH SCIENCES, INC.
MAM!da -KE016!7,H -Projwsl'XXH6/71K£UVP -\V2K Page 5
Evende/1 Preliminary Plat
King County, Washington
Subsurface Exploration and
Preliminary Geotechnical Engineering Repon
Design Recommendations
soils, if encountered, should be removed and any remaining roots grubbed. Areas where loose
surficial soils exist due to grubbing operations, should be considered as fill to the depth of
disturbance and treated as subsequently recommended for structural fill placement.
Since the density and moisture content of the soil at the site are variable, random loose or wet
pockets may exist, and the depth and extent of stripping can, therefore, be best determined in
the field by the geotechnical engineer. Stripping depths are expected to be on the order of 1
foot, but are expected to vary locally.
We recommend that building and roadway areas be proof-rolled with a loaded, tandem-axle
dump truck to identify any soft spots. Soft areas should be overexcavated and backfilled with
structural fill.
In our opinion, stable construction slopes should be the responsibility of the contractor and
should be determined during construction. For estimating purposes, however, we anticipate
that temporary, unsupported cut slopes in the till sedim~nts can be planned at a maximum slope
of lH: 1 V (Horizontal: Vertical). As is typical with earthwork operations, some sloughing and
raveling may occur, and cut slopes may have to be adjusted in the field. In addition,
WISHA/OSHA regulations should be followed at all times.
8.0 STRUCTURAL FILL
All references to structural fill in this report refer to subgrade preparation, fill type, and
placement and compaction of materials as discussed in this section. If a percentage of
compaction is specified under another section of this report, the value given in that section
should be used.
Construction plans are preliminary at this stage and do not include site grading information or
building footprint locations. However, placement of structural fill may be necessary in order
to achieve the desired site grades in some areas. After overexcavation/stripping has been
performed to the satisfaction of the geotechnical engineer, the upper 12 inches of exposed
ground in building areas or areas to receive fill should be recompacted to 90 percent of the
modified Proctor maximum density using ASTM:D 1557 as the standard. · If the subgrade
contains too much moisture, adequate recompaction may be difficult or impossible to obtain
and should probably not be attempted before allowing the subgrade to dry/drain adequately.
After recompaction of the exposed ground is tested and approved, structural fill may be placed
to attain desired grades. Structural fill is defined as non-organic soil, acceptable to the
geotechnical engineer, placed in maximum 8-inch loose lifts with each lift being compacted to
at least 95 percent of ASTM:D 1557 as the standard. Organic topsoil is not considered
suitable for use as structural fill. Lodgement till soils may be used as structural fill if properly
November 16, 2001 ASSOCIATED EARTH SCIENCES, INC.
.l,UMtdtJ -KE0/6/7,H -Projwsl::!0016/71KEl\VP-W:?K Page 6
Evendell Preliminary Plat
King County, Washington
Subswface Exploration and
Preliminary Geotechnical Engineering Repon
Design Recommendations
handled and moisture conditioned. In the case of roadway and utility trench filling, the
backfill should be placed and compacted in accordance with applicable municipal codes and
standards. The top of the compacted fill should extend horizontally outward a minimum
distance of 3 feet beyond the location of the perimeter footings or roadway edge before sloping
down at an angle of 2H: 1 V.
The contractor should note that any proposed fill soils should be evaluated by Associated Earth
Sciences, Inc. (AESI) prior to their use in fills. This would require that we have a sample of
the material 72 hours in advance of filling activities to perform a Proctor test and determine its
field compaction standard. Soils in which the amount of fine-grained material (smaller than the
No. 200 sieve) is greater than approximately 5 percent (measured on the minus No. 4 sieve
size) should be considered moisture-sensitive. Virtually all of the on-site soils are classified as
moisture-sensitive, and were judged to be at or above optimum moisture for compaction.
Thus, they should be considered suitable for reuse as structural fill only for dry weather and
dry subgrade conditions. In addition, construction equipment traversing the till soils when wet
can cause considerable disturbance. If fill is placed during wet weather above the till
sub grades or if proper compaction cannot be obtained in these areas, a select import material
consisting of a clean, free-draining gravel and/or sand should be used. Free-draining fill
consists of non-organic soil with the amount of fine-grained material limited to 5 percent by
weight when measured on the minus No. 4 sieve fraction.
A representative from our firm should inspect the stripped subgrade and be present during
placement of structural fill to observe the work and perform a representative number of in-
place density tests. In this way, the adequacy of the earthwork may be evaluated as filling
progresses and any problem areas may be corrected at that time. It is important to understand
that taking random compaction tests on a part-time basis will not assure uniformity or
acceptable performance of a fill. As such, we are available to· aid the owner in developing a
suitable monitoring and testing frequency.
9.0 FOUNDATIONS
Spread footings may be used for building support when founded directly on structural fill
placed as previously discussed or on medium dense to very dense, lodgement till soils. We
recommend that an allowable bearing pressure of 2,000 pounds per square foot (psf) be used
for design purposes, including both dead and live loads, for footings placed on till or approved
structural· fill placed as discussed above. An increase of one-third may be used for short-term
wind or seismic loading. Perimeter footings should be buried at least 18 inches into the
surrounding soil for frost protection. All footings must penetrate. to the prescribed bearing
stratum, and no footing should be founded in or above organic, non-structural fill, or
soft/loose soils. Footings should have a minimum width of 14 inches for I-story structures,
with 2 inches of width added for each additional story.
November 16, 2001 ASSOCIATED EARTH SCIENCES. INC.
MAM!da -KE0/6/7AI -Projws\XJ0/617\KEIWP-w:?K Page 7
Evende/1 Preliminary Plat
King County, Washington
Subsurface Exploration and
Preliminary Georechnical Engineering Repon
Design Recommendations
The area bound by lines extending downward at lH: 1 V from any footing must not intersect
another footing or intersect a filled area that has not been compacted to at least 95 percent of
ASTM: D 1557. In addition, a 1.5H: 1 V line extending down from any footing must not
daylight because sloughing or raveling may eventually undermine the footing. Thus, footings
should not be placed near the edge of steps or cuts in the bearing soils.
Anticipated settlement of footings founded as described above should be on the order of 1 inch
or less. However, disturbed soil not removed from footing excavations prior to footing
placement could result in increased settlements. All footing areas should be inspected by AESI
prior to placing concrete to verify that the design bearing capacity of the soils has been attained
and that construction conforms to the recommendations contained in this report. Such
inspections may be required by the governing municipality. Perimeter footing drains should be
provided as discussed under the section on Drainage Considerations.
10.0 FLOOR SUPPORT
· A slab-on-grade floor may be constructed directly on structural fill or medium dense, natural
ground. Areas of slab subgrade that are disturbed (loosened) during construction should be
compacted to a non-yielding condition. Where moisture migration through the floor slab is to
be controlled, such as in occupied portions of the house, the floor should be cast atop a
capillary break. The capillary break layer should consist of 4 inches of washed pea gravel
covered with a polyethylene plastic vapor barrier. Based on American Concrete Institute
recommendations, we also suggest placing a 2-to 3-inch layer of clean sand over the vapor
barrier to protect the vapor barrier and to allow some moisture loss through the bottom of the
slab to aid in the curing process. Sand should be used to aid in the fine-grading process of the
subgrade to provide uniform support under the slabs.
11.0 DRAINAGE CON SID ERA TIO NS
Traffic across the site soils when they are moist or wet will result in disturbance of the
otherwise firm stratum. Therefore, prior to site work and construction, the contractor should
be prepared to provide drainage and subgrade protection, as necessary.
All perimeter footing walls should be provided with a drain at the footing elevation. Drains
should consist of rigid, perforated, PVC pipe surrounded by washed pea gravel. The level of
the perforations 1n the pipe should be set approximately 2 inches below· the bottom of the
footing. The drains should be constructed with sufficient gradient to allow gravity discharge
away from the building. Roof and surface runoff should not discharge into the footing drain
system but should be handled by a separate, rigid tightline drain. In planning, exterior grades
November 16, 2001 ASSOCIATED EARTH SCIENCES, INC.
MAM!da -KE0/617,H -Projwsl20016/7\K£!WP-\V:!K Page 8
Evende/1 Preliminary Plat
King County, Washington
Subswface Exploration and
Preliminary Geotechnical Engineering Repon
Design Recommendations
adjacent to walls should be sloped downward away from the structure to achieve surface
drainage.
12.0 PROJECT DESIGN AND CONSTRUCTION MONITORING
At the time of this report, site grading, structural plans, and construction methods have not
been finalized. We are available to provide additional geotechnical consultation as the project
design develops and possibly changes from that upon which this report is based. We
recommend that AESI perform a geotechnical review of the plans prior to final design
completion. In this way, our earthwork and foundation recommendations may be properly
interpreted and implemented in the design.
We are also available to provide geotechnical engineering and monitoring services during
construction. The integrity of the foundation depends on proper site preparation and
construction procedures. In addition, engineering decisions may have to be made in the field
in the event that variations in subsurface conditions become apparent. Construction monitoring
services are not part of this current scope of work.· If these services are desired, please let us
know and we will prepare a proposal.
We have enjoyed working with you on this study and are confident that these recommendations
will aid in the successful completion of your project. If you should have any questions, or
require further assistance, please do not hesitate to call.
Sincerely,
ASSOCIATED EARTH SCIENCES, INC.
Kirkland, Washington
Melissa A. Magirnson, P.E.
Senior Staff Engineer
Attachments: Figure I:
Figure 2:
Appendix:
November 16, 2001
Vicinity Map
Site and Exploration Plan
Exploration Logs
MAM!da -K£0/617AI -Projects\'2001617\KEI\VP-......-.:?K
Bruce L. Blyton, P.E.
Principal Engineer
ASSOCIATED EARTH SCIENCES, INC.
Page 9
~
E
.f
~ ;;
ij Associated Earth Sciences, Inc.
~
l~ ;; ~ ~ ~ ~
11
/
~000 FUl O 000"'
Printed lkiM TOPOI Cl99S Wikilbw11 P:ocii.x:tions (ITinl'.topo.com)
VICINITY MAP ,
EVENDELL PRELIMINARY PLAT
KING COUNTY, WASHINGTON
FIGURE 1
DATE 11/01
PRDJ. NO. KE01617A 0-----------------------------------------------------------------
"'o o'>
<o' o'>
'~:;; 2
R-4
90'
"'" o'>
:-,j ~ S>-10;
1Q'
" ,µ·· 90' ;~ ~ :· i 4 ~,
~
~l' II) EP-1211\' ...
-v rfTIMPI )Nil
.s,'W~>a;l\.l1-"1)~111L) --~ -~·4'1.11
kll bCl. '~ ~m'«ll•Jo..ZIJr;r
,_W'Q.•2D.lDIJCSj&.1J'~
]!Q'._
5· ~ 103'
'~ •
{~
90'
8
90•
7 -90•
6 -lOJ'
"'o o'>
"
9 .,.
...,
!2'b6P·11'
99'
11
JO,'
ll
;,, •
• ,.
~
~
R-4
--
,,,--' x,,,,,,,,, ~,,,,,,,, ''-'-' '"""'"'
48 0 eo~ I
87'
48
,,· . .,. ...
47 ~ 51 f:. 132··.. ~
--1' .,. I Jo,' I
46 ~ ~!~~ R2'
413 .,. \
•' o'
@ I ,. ,( 44_ J l:e 42 :el 41 l!., 8 " "'l,n -,• ~·
R-4
@\ @
,.
G 12 ~ _,,._
13 ' 0 • •
@\~ .,.
14 ~ ,,.
~ 15 I
M"
,. ,• 111 i:;
/
r. !l8 • 76° 74 ,,.
8 . • 69' . --~ -57 0 45· 45• ~ 72 95' •
85' -! ----ll
.2.0· 0 ,. 31 ~ ~· I 20· }.~ 70:e~ !l8 \lJ 59~ 71 ~ ~
-.., PRIVATE ACC(SS IS,
i<" TR,i,CT T ·~
, ..
N'
... 9· r· -"~"',,,,i\T_,,,,._'_EP., · ~..,-fll EP-4 i::::tf"ca,T. US£ ORM:W"l ' 4_9_" ,,. 20 ~ 11V,CT ")l' /
88 ~ ea ~l'".i. 81 ·~1 80 ~ 151 ~-.2_4'
~
IJ:'
27 ~I 28 !i
11.Q.'
205'
R(CREATIOM i'AACT 'K'
14,868 SF ' ' = t G2~gt.1~
i'~ 17 8fi' ~----! 1 ·, M' 20s·
@ ® 10
79
• 83 'g 84 9
I 11: 1S ~-·J c 79' 1-'
00~ I I~ ..; --,-.. . J '° ! ~....,I.....,.,.'' -,--.,.,.., -:.
~~~==-~
e6 ;I, 1!111 :. J J ; \ \ \[]( f ~ OCT / ~\c\\ !,,
S,' ! ~, w / , :~ EP,.3\j'
..:'> I (\\\1 . ,:1/gl N
A
~ IJO ,,.
Fm
~.-.... ... : c..-o..*'P'N .. ~
Associated Earth Sciences, Inc.
~m~[!i~
[O I : I j i~ 19 ° 20 !J 2.1 -~ 2.2 gt 23 'al
~" i I I I I I r:,u , ! I I I '
Cl \ !:O' I so· i ~o· ~o· . 50· J
e,O .,c
G;
'-'
.,-~ =I 2.6 ;: 'l l c¢l i ~
24 ~1 25 ", ' -, .
. i •o ! ';j --· ··:_;,
. I 50 ~-.. ,.o ~o -rc:11:::0~~
=~-:! ·~gf7,: ::,o,<'O,J =~-~--·~~; .. s~, ~ ~ ";'-"°;~~= 7 ..........
SITE AND EXPLORATION PLAN
EVENDELL PRELIMINARY PLAT
KING COUNTY, WASHINGTON
<h" d" .,.,
o"'
.,o
o'
sP
o"'
"" <>"'
"'" c:?
"'" o"'
R-4
LEGEND
EP-1 IE] Approxima1 e location of exploration pit
FIGURE 2
DATE 11/01
PROJECT NO. KE01617A
.j
'.
i
" > " u.i
0
0
"' ci z
C o.
"' " C s
" a:
~
0
"' C ..
,5
e
0 ::; ..
'a
Cl]
"' " .s e
'!! .. e
8
C
0 = u e
IL
C:
0
'ii
it
..
"l! ..
CD
Well-graded gravel and
GW gravel with sand, little to
no fines
GP
Poorly-graded gravel
and gravel with sand,
little to no fines
Silty gravel and silty
GM gravel with sand
Clayey gravel and
GC clayey gravel with
sand
Well-graded sand and
:Ni sand with gravel, little
to no fines
SM
SC
Poorly-graded sand
and sand with gravel,
little to no fines
Silty sand and
silty sand with
gravel
Clayey sand and
clayey sand with
gravel
Sil~ sandy silt, gravelly silt,
ML silt with sand or gravel
CL
Clay of low to medium
plasticity; silty, sandy, or
gravelly clay, lean clay
Organic clay or silt of low
OL plasticity
·.-· ···-= .. ·:··.···.:·
,. _):/-r:r~;;:i·
Tenns Describing Relative Density and Consistency
Co=a-
Grained Soils
F'111&-
Grained Soils
Density SPT"\,1ows1root
Ve,y Loose O to 4
loose 4 ID 10
Medlum Dense 10 ID 30
Dense 30 to so
Ve,y Dense >50
Consistency SP"r2'blowsifuot
Ve,y Soft O ID 2
Soft 2 to 4
Med"11J1T1 Stiff 4 to 8
Stiff 8 to 15
Ve,y Stiff 15 to 30
Hard >30
Component Definitions
Test Symbols
G = Grain Size
M = Moisture Cootent
A = Atterberg Limits
C = Chemical
DD = Diy Del);lity
K = Permeability
Desaiptive Term Size Range and Sieve Number
Bouldem Larger than 12'
Cobbles 3" to 12'
Gravel 3" to No. 4 (4.75 rm,)
Coarse Gravel 3' to 'J/4'
Fine Gravel 'J/4' lo No. 4 (4.75 mm)
Sand No. 4 (4.75 rm,) to No. 200 (0.075 mm)
Coarse Sand No. 4 (4.75 mm) to No. 10 (2.00 mm)
Medium Sand No. 10 (2.00 mm) to No. 40 (0.425 mm)
Fine Sand No. 40 (0.425 mm) to No. 200 (0.075 mm)
Silt and Clay Smaller than No. 200 (0.075 mm)
(Jl Estimated Percentage Moisture Content
Component
Percentage by Diy • Absence of moisture,
Weight dusty, dry to lhe touch
Trnce
Fe,v
Little
Wrth
-Sampler
Type
<S Sightly Moist -Perceptible
5 to 1 O moisture
15 to 25 Moist· Damp but no visible
• Non-prinaiy coarse water
constltllents: ~ 15% Ve,y Moist -Waler visible but
-Fines content between not free draining
5%and15%
Blows/6' or
portbn of 6'
Wet-Visible free water, usually
from belcw water table
Symbols
Bastic silt, clayey silt. silt 2.0" 00 with micaceous or
I • •
Sampler Type
Oesaiption eemome -Fiae,padcwih
Splij-Spoon
dialomaceous fine sand or Sampler
lliWJr---t"s"'ilt~-:-:-:-.-:--:--.-:-.-:--1 (SP1)
Clay of high plasticity,
sandy or gravelly clay. fat Bulk sample
MH
c!ay with sand or gravel
•
3.0' 00 Splft-Spoon Sampler
325' OD Spla-Spoon Ring Sampler
• JD' OD Thin-Wall Tube Sampler
(mduding Shelby tube)
Pornon not recovered
,.,
blank casirg
sedlon
Sa....-..l casirg
orHyaotlp --pad<
End cap
Organic clay or silt of
medium to high
plastic:ty
111 Percentage by dry weigh<
C2l (SFT] Slal1dan:I Penelralion Test
i"J Depth cf grcunC'Nater
crl;,---+--------1 (ASTM D-1586)
,-. .!l Peat, muck and other (3) 1n General Acccrdaflca with 8" :Ci~
:'l Am = Al time of dnlling
'fl_ --Slalic waler level (dale)
151 Combined uses symbols used ror
lines between 5% and 15%
~ _g, e.:l highly organic soils Standard Practice lcr Desoiption
j :c O and ldef11ific:al!on cl Soils (ASTM D-2488) ;;'-----==:=__ _ _L _________ _L ____________________________ __,
;ii: ~ns of .soil.s in :his report are b~ed on V$1.d fi&kl md/Ot laboratory obseC'vations. \IIOich indude density/consistency, moi:stun, o:n:filion, grain size,
d plasticity e::stfmat.e.s and should not be co~ed to imply fl'*I or laboratory te:stfng unless p~nt&d heretl'T. 1./buah'nanual and/or laboratory ~as:sn'!catk>n
.othcds ot ASTM G-2487 and D-24.88 ware~ ill an idemtl'lcadon guide ror the Un.iffcd Soil ~rlkatlon s~
E i======================================= i i 1c111~:~IATEO !H~ ' SCIENCES, INC
FlQJRE
Exploration Log Key A-1
:a-----------------------------------------'---------
1 -
2 -
3 -
4 -
5 -
6 -
7 -
__ LOG OF EXPLORATION PIT NO. EP-1
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for U,e named project and should be
read lqgelher with that report for complete interpretation. This summary applies only to the location of this trench at the
time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are
a simplflcatlon of actual conditions encountered.
DESCRIPTION
Topsoil and Grass
Weathered Till
Loose to medium dense, damp, reddish brown, SIL TY fine SAND, little fine gravel. (SM)
. TIii
Medium dense to dense, damp, mottled gray, SIL TY fine to coarse SAND, some fine to coarse
gravel, trace cobbles. (SM)
Becomes very dense and less mottled. (SM)
8-1------------------------------------
9 -
B~ttom of exploration pit at depth 8 feet
No ground water seepage or caving. Elevation 467'.
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
g ~-------------------------------------------.;
~
j
;;:
~ ;;;
0
~
~ u
Logged by: BWG
Approved by:
Evendell Preliminary Plat
King County, WA
ASSOCIATED
EARTH
SCIENCES, INC
Project No, KE01617A
November 2001
~-------------------------------------------
g
£
Q. ..
0
1 -
2
_ LOG OF EXPLORATION PIT NO. EP-2
This log Is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
read tqgeUier with that report for complete interpretation. This summary applies onty to the location of this trench at the
time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are
a simplflcatfon of actual condiUons encountered.
DESCRIPTION
Topsoil and Forest Duff
Weathered TIii
Loose to medium dense, moist, reddish brown, SIL TY fine to medium SAND, little fine gravel. (SM)
Till
Medium dense to dense, damp, mottled gray, SIL TY fine to coarse SAND, some fine to coarse
3 -gravel, trace cobbles. (SM)
4 -
5 -Becomes very dense and less mottled. (SM)
6 -
7 -
8 -
9-1---------------------------------
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
Bottom of exploration pit at depth 9 feet
No ground water. seepage or caving. Elevation 465'.
~-----------------------------------~-------:!
I • Ji
ii'.
C>
"' w :;
f
Logged by: BWG
Approved by:
!.! ___________ -'-----------------~·
Project No, KE01617A
November 2001
LOG OF EXPLORATION PIT NO. EP-3
This Jog is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
read tqgether with that report for complete Interpretation. This summary applles only to the location of this trench at the
time of excavation. Subsurface condifions may change at this location with the passage of time. The data presented are
a simplfication of actual conditions encountered.
DESCRIPTION
Topsoil and Forest Duff
1 -Weathered Till
Loose to medium dense, damp, reddish brown, SIL TY fine SAND, trace fine gravel. (SM)
2 -
TIii 3 -Medium dense to dense, damp, mottled gray, SIL TY fine to coarse SAND, some fine to coarse
4 -
5 -
6 -
7 -
8 -
9 -
10
11
12 -
13 -
15 ..
16 -
17 -
18 -
19 -
gravel, few cobbles. (SM)
Grades to moist to wet (no free water) to bottom of exploration pit.
Grades to very dense and less mottled. (SM)
Bottom of exploration pit at depth 14 feet
No ground water seepage or caving. Elevation 458'.
~-------------------------------------------,;
-Evendell Preliminary Plat j King County, WA
~
<.1 &S1"7 ASSOCBATEC ~ Logged by: BWG I" .<t!l!)ill!!l. EARTIHI
0 Approved by: Mmi!i:C SCIENCES, INC
~----------------------------
Project No. KE01617A
November 2001 ·
g
5
Q.
" 0
LOG OF EXPLORATION PIT NO: EP-4
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
read together with that report for complete Interpretation. This summary applies only to the location of this trench at the
time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are a simplfication of actual conditions encountered.
DESCRIPTION
Topsoil and Forest Duff
1 -~---------------=--cc--,-=~---------------Weathered TIii
2 -Loose to medium dense, moist, reddish brown, SIL TY fine SAND, little fine gravel. (SM)
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
TIii
Medium dense to dense, damp, mottled gray, SIL TY fine to coarse SAND, little to some fine gravel.
(SM)
Very dense, damp, gray, SILTY fine SAND, little fine gravel. (SM)
Bottom of exploraUon pit at depth 1 O feet
No ground water seepage or caving. Elevation 464 ',
1::-------------------------------------------ri
n
~
~
Logged by: BWG
Approved by:
!;! ____________________ _
Project No, KE01617A
November 2001
1
2 -
3
__ LOG OF EXPLORATION PIT NO. EP-5
This log is part of the report prepared by Associated Earth Sciences, Inc. {AES!) for the named project and should be
read together with that report for complete interpretation. This summary applies only to the location of this trench at the
time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are
a simplfication of actual conditions encountered.
· DESCRIPTION
Topsoil and Forest Duff
Weathered Till
Loose to medium dense, damp, reddish brown, SIL TY fine SAND, little fine gravel. (SM)
Till
Medium dense to dense, damp, mottled gray, SIL TY fine to coarse SAND, some fine gravel. (SM)
4 -
5 -
6 -
7 -
8 -
g
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
Becomes very dense and gray. (SM)
Bottom of exploration pit at depth 9 feet
No ground water seepage or caving. Elevation 468'.
~----------------------------------------
ii
I
~
!:
~
0
~
~
Logged by: BWG
Approved by:
Evendell Preliminary Plat
King County, WA
&SIASSCJCIATEC r~ . EARTH
._,~ SCIENCES, INC
Project No, KE01617A
November 2001
~-------------------------------------------
g
g
£
C.
" 0
LOG OF EXPLORATION PIT NO. EP-6
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
read tqgettier with that report for complete interpretation. This summary applies only to the location of this trench at the
time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are
a simplficatlon of actual conditions encountered.
DESCRIPTION
Topsoil and Forest Duff
1 -Weathered TIii
Loose to medium dense, damp, reddish brown, SIL TY fine SAND, little fine gravel. (SM)
2 -
3 -1-----------------T=m----------------
Medium dense to dense, damp, mottled gray, SIL TY fine SAND, little fine gravel, trace cobbles,
4 -trace boulders. (SM)
5 -Becomes very dense and gray. (SM)
6 -
7 -
8 -
9-1-------------------------------------''-
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
Bottom of exploration pit at depth 9 feet
No ground water seepage or caving. Elevation 474'.
N----------------------------------------------M
' l
a:
;!
w
0
M
~
~
Logged by: BWG
Approved by:
Evendell Preliminary Plat
King County, WA
&SI~ ASSOCIATED
V' K,Jl!!A EARTH
~ SCIENCES, INC
Project No, KE01617A
November 2001 s! _________________________________________ _
g
5
C. w
0
LOG OF EXPLORATION PIT NO. EP-7
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
read tqgelher with that report for complete Interpretation. This summary applies only to the location of this trench at the
time of excavation. Subsurface conditions may change at this location WIU1 the passage of Urne. The data presented are
a simplfication of actual conditions encountered.
DESCRIPTION
Topsoil and Forest Duff
1 -1------------------,-,,,....-,,.-~=~-------------Weathered Till
2 _ Loose to medium dense, damp, reddish brown, SIL TY fine SAND, some fine gravel. (SM)
Till 3 -Medium dense to dense, damp, mottled gray, SIL TY fine to coarse SAND, little to some fine to
4 -
coarse gravel, trace cobbles. (SM)
5 -
Becomes very dense and gray. (SM) 6 -
7 -
8 -
9
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
Bottom of exploration pit at depth 9 feet
No ground water seepage or caving. Elevation 473'.
~-------------------------------------------,.;
i z
o'.
;!
;;;
0
le
~
Logged by: BWG
Approved by:
Project No. KE01617A
November 2001
!;! ____________________________________ _..;. _____ _
LOG OF EXPLORATION PIT NO. EP-8
g This log is part of lhe report ,l'repared by Associated Earth Sciences, Inc. (AESI) for lhe named e,roject and should be
5 read together with that repq for comlllete interpretation. This summary ~plies only to the loca ·on of this trench at the a. ·ume of excavation. Subsurface condl ·ens may change at this location wi llle passage of time. The data presented are " Cl a simplfication of actual conditions encountered.
DESCRIPTION
Topsoil and Forest Duff
1
Weathered Till
2 -Loose to medium dense. moist, reddish brown, SIL TY fine to medium SAND, little fine gravel. (SM)
3 Till
4 -Medium dense to dense, wet, mottled gray, SIL TY fine to coarse SAND, little to some fine gravel,
trace cobbles. (SM)
5 -
6 -Becomes very dense and gray. (SM)
7 -
8 -
9
10 -Bottom of exploration pit at depth 9 feet
Weak ground water seepage from 3'-6 developed after 1/2 hour. No caving. Elevation 476'.
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
.
19 -
~---------------------------------------------,.;
~
~ ;.
0
:;'
Logged by: BWG
Approved by:
Project No. KE01617A
November 2001
~---------------------------------------------
g
= a.
~
D
LOG OF EXPLORATION PIT NO. EP-9
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
read together with that report for complete interpretation. This summary applies only to the location of this trench at the
time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are
a simpllicatlon of actual conditions encountered.
DESCRIPTION
Topsoil and Forest Duff
1 Weathered Till
Loose to medium dense, damp, reddish brown, SIL TY fine to medium SAND, trace fine gravel.
2 -(SM)
TIii 3 -Medium dense to dense, damp, mottled gray, SIL TY fine to coarse SAND with fine to coarse gravel,
4 -trace cobbles. (SM)
5 -Grades to very dense and gray. (SM)
6 -
7 -
8 -
9-t--------------------------------
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
Bottom of exploration pit at depth 9 feet
No ground water seepage or caving. Elevation 482'.
.
~----------------------------------------------
" ? • £
~
~ :: ;;
;;
ii'.
~
Logged by: BWG
Approved by:
Project No. KE01617A
November 2001
------------------------------------
g
5
C.
~
1 -
__ LOG OF EXPLORATION PIT NO. EP-10
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI} for the named project and should be
read togeUier with that report for complete interpretation. This summary applles only to the locafion of this trench at lhe
Ume of excavation. Subsurface condiUons may change at this location with the passage of time. The data presented are
a simplfication of actual conditions encountered.
DESCRIPTION
Topsoil and Grass
Weathered Till
Loose to medium dense, damp, reddish brown, SIL TY fine to medium SAND, little fine to coarse
2 _ gravel. (SM)
3 -
4 -
5 -
6 -
7 -
8 -
9
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
Till
Medium dense to dense, moist, mottled gray, SIL TY fine to coarse SAND, some fine to coarse
gravel. (SM)
Becomes very dense and gray. (SM)
Bottom of exploration pit at depth 9 feet
No ground water seepage or caving. Elevation 492'.
~---------------------------------------------
:; Evendell Preliminary Plat I j King County, WA
ii'.
:: ASSCCBATEC Project No, KE01617A ;;; Logged by: BWG , EARTH
0
Approved by: SCIENCES, INC November 2001
~---------------------------------------------
__ LOG OF EXPLORATION PIT NO. EP-11
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
read tqgetJier with that report for complete interpretation. This summary applies only to the locafion of this trench at the
time of excavation. Subsurface conditions may change at this location with the passage of Ume. The data presented are
a slmplfication of actual condiUons encountered. .
DESCRIPTION
Topsoil and Grass
Weathered TIii 1 -Loose to medium dense, damp, reddish brown, SIL TY fine SAND, little fine to coarse gravel. (SM)
2 -
3 Till
Medium dense to dense, moist, mottled gray, SIL TY fine to coarse SAND with fine to coarse gravel,
4 -trace cobbles. (SM)
5 -
Grades to very dense and gray. (SM) 6 -
7 -
8 -
9 -4--------------------------------------1
10
11 -
12 -
13
14 -
15 -
16 -
17 -
18 -
19 -
Bottom of exploration pit at depth 9 feet
No ground water seepage or caving. Elevation 488'.
~-------------------------------------------
I
;:
;!
m
0
2
Logged by: BWG
Approved by:
Evendell Preliminary Plat
King County, WA
ASSOCIATED
EARTIHI
SCIENCES, INC
Project No. KE01617 A
November 2001
~-------------------------------------------
g
5 g.
0
1 -
2 -
3 -
4 -
5 -
_ LOG OF EXPLORATION PIT NO. EP-12
This log ls part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
read tqgettier with that report for complete interpretation. This summary applies onty to the location of this trench at the
time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are
a slmplfication of actual condiUons encountered.
DESCRIPTION
Topsoil
Weathered Till
Loose to medium dense, damp, reddish brown, SIL TY fine to medium SAND, few fine gravel. (SM)
Till
Medium dense to dense, moist to wet, mottled gray, SIL TY fine to coarse SAND, some fine to
coarse gravel, trace cobbles. (SM)
Becomes very dense, wet, and gray. (SM) 6 -
7 -
8 -
9 -
10 -
11
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
Bottom of exploration pit at depth 11 feet
No ground water seepage or caving. Elevation 484'.
i--------------------------------------,.;
~
~ ;;;
0
M
~
Logged by: BWG
Approved by:
Project No. KE01617A
November 2001 g __________________________________________ _
,,
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES
October 28, 2002
Centurion Development Services
22617·-8111 Drive SE .
Bothell, Washington 98021
RE: ADDENDUM to the Wetland Evaluation and Delineation Report, Wildlife
Habitat Evaluation, and Conceptual Wetland Mitigation Plan for the Evendell
. Project Site
Dear Mr. Romano,
PAGE 02
Subsequent to the preparation of the "Wetland Evaluation and Delineation
Report, Wildlife Habitat Evaluation, and Conceptual Wetland Mdigation Plan' for
the Evendell Project Site, (Habitat Technologies, May 2001) the Selected Action
Plan has been modified. This addendum describes U,e changes from the original
report.
The Evendell Project Site is approximately 14 acres in total size and is located
east of the City of Renton, King County, Washington. Onsite assessment of the
project site following the procedures outlined in the Washfngton State Welfands
Identification and Delineation Manual (Wast,. Manual) and the Corps of
Engineers Wetlands Delineation Manual (1987 Manual) resulted. in the
identification of one area (Wetland A) that exhibited hydric soils, wetland
hydrology, and hydrophytic vegetation consistent with the established criteria of
both the Wash. and 1987 Manuals.
The preliminary Selected Action Plan of the l:vendell project site included the
creation of independent lots suitable for the development of single-family
homesites consistent with the King County Comprehensive Plan. Buffer
averaging was to be used along the western boundary of the onsite wetland as a
part of this lot creation.
Selected Actfion Plan
The Selected Action Plan of the E,vendell project site focuses on the creation of
independent lots suitable for the development of single-family homesites
consistent with the King County Comprehensive Plan (Attachment 1 -
Preliminary Plat}. An essential element of this process is the development of
access roadways and utillty corridors that meet both King County health and
safety standards and the goal of avoidancs and minimization of potential short-
term or Jong-term adverse impacts to aquatic environments.
wetlands, stnlams, flsherios, vrildllfe -mitigation and pc;,rmittlng solutions
, P.O. Box 1088, P11yalliap, Washington 98371 ,
voice 253•845-5'119 fan 253~1-1942 Evendetl-1
00082 Wetlendl'lifddl'ifa Report ADDENOUM
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 03
A primary feature in the creation of these homesite lots will be the establishment
of a protective buffer adjacent to the identified onsite wetland consistent with
King County Sensitive Area codes. The creation of these homesite lots will not
require placement of fill within identified wetland areas or reduction of the
standard buffer width as previously proposed.
Site development requires construction of road improvements within existing
unopened SE 138 111 Street right-of-way along the northern project boundary. This
will require the unavoidable filling of the northem 200 square feet of Wetland A
and reduction of the associat,d buffer by 4,649 square feet. In addition, in
response to King County staff concems, the applicant has proposed constructing
road frontage improvements along 1601h Avenue SE consisting of a paved
shoulder and relocation of the drainage ditch. This will require the unavoidable
intrusion into 2,340 square feet of the buffer for Wetland A. As mitigation for the
unavoidable loss of wetland and buffer associated with required . road
improvements, the wetland_buffer will be increased by the addition of 15,495
square feet of forested_area located in the northeast comer of the site between
the eastern boundary of the wetland and 16ott' Ave. SE. Provision of this
additional buffer fully compensates for the unavoidable · intrusions into the
wetland and standard buffer areas and will not adversely impact the remaining
wetland area.
ELEMENTS OF THE BUFFER ADDITION AND WETLAND RESTORATION
PLAN
1. The buffers associated with the identified onsite wetland will be established to
the King County standard 50-foot width. Identified onsite wetland and
associated buffers will run be adversely impacted by future onsite land uses.
2. As a part of the development of the required roadway improvements the
actual encroachment into buffer area of Wetland A will be held to the
minimum necessary to meet County roadway requirements. Following
placement of the roadway improvements the roadway side slopes within the
buffer areas will be revegetated by seeding with an appropriate seed mixture.
3. As compensation for unavoidable encroachment into the north end of
Wetland A, 400 square feet (a 2 to 1 ratio} of degraded wetland in the
proximity of the edge of the roadbed will be enhanced through the planting of
native trees and shrubs. This restoration will enhance wetland function by
providing structural diversity in the plant community.
4. As compensation for unavoidable encroachment into the north end of the
buffer associated with Wetland A and a portion of the buffer on the east side
of Wetland A the standard buffer will be inaeased to encompass the entire
northeast comer of the property. This buffer width increase will enhance
Evendell -2
OOD62 WellandM/ildlife Report ADDENDUM
•
I -.
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 04
~·
wetland function relative to that provided by standard buffers through
increased visual and auditory blockage from 1601h Ave. SE and greater
conservation of wildlife habitat opportunities .
!!ii. In order to protect the wetland and associated buffer erosion control Best
Management Practices will be implemented during all phases of construction.
These measures include silt fencing along the buffer prior to any onsite
actions. In addition, all exposed areas will be seeded with low growing
grasses upon the completion of onsite actions.
6. All activities related to the establishment of the buffer areas will be .. monitored
by the project'biologist.
WETLAND RESTORATION AND BUFFER ENLARGEMENT PLAN
The GOAL of the identified buffer addition plan is to ensure that proposed site
development actions (i.e. the upgrading of an existing right-of-way roadway to
meet King County health and safety standards) do not create a short-term or
long-term adverse impact to the onsite wetlands or associated buffer areas.
The total amount of King County jurisdictional wetland area to be unavoidably
modified by this project equals 200 square feet. As compensation · for this
unavoidable impact to Wetland A, 400 square feet (a 2:1 ratio) of remaining
degraded wetland will be restored through the planting of native trees and
shrubs.
The total amount of King County jurisdictional buffer area to be unavoidably
modified by this project equals 6,986 square feet. As compensation for this
unavoidable impact to Wetland A, 15,495 square feet (a 2.2:1 ratio) of area at
the northeastem comer of the project will be dedicated to buffer area.
The purpose of the Wetland Restoration Plan is two fold.
Finrt, to define the wetland restoration plan proposed as an element of the
construction of the Evendell development.
Second, to identify the objectives and Cl'ileria whereby the success of the
completed wetland and buffer restoration plan will be determined.
EvandeJI • 3
00082 W'!llandlWlldlifB Report ADDENDUM
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 05
·"'·-·
WETLAND IEVAlUATION AND IDEllN!EATION REPORT,
WillDlilFE HABITAT EVALUATION, AND
COMPIENSATOR:Y WETLAND MITIGATION Pl.AN
EVENDELL RESIDENTIAL COMMUNITY
King County, Washington
Part of Section 14, Township 23 North, Range 5 East, W.M.
prepared for
Centurion Development Services
22617 -81h Drive SE
Bothell, Washington 98021
prepared by
HAB.ITAT TECHNOLOGIES ·
P .0. Boit 1088
Puyallup, Washington 98371-1088
253-845-5119
May 15, 2001
wetlands, streams, fisheries, WIidiife -mitigation and permitting solutions
P.O. Box 1088, Puyallup, W38hington 98371
voice 253•845•5.119 fax 253-841-1942
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 06
EXECUTIVE SUMMARY
The Evendell Residential Community is approximately 14 acres in total size and
located to the east of the City of Renton, King County, Washington. The project site is
comprised of two adjacent parcels; Parcel A of 11.5 acres, and Parcel B of 2.5 acres
directly to the west of Parcel A. The Parcel A portion of the project site is dominated by
a mature Douglas fir (Pseudotsuga menziesi1) forest plant community on the periphery
of the parcel that has been planted following prior forest harvest activities. A single-
family dwelling is located in the northern portion of Parcel A The center of Parcel A has
been cleared and is dominated by a dense canopy of Himalayan blackberries (Rubus
procera). The southern portion of Parcel A is dominated by active livestock pasture.
Parcel B portion is dominated by an active livestock pasture which also contains a
single-family dwelling and four associated buildings.
Onsite assessment of the project site following the procedures outlined in the
Washington State Wetlands Identification and Delineation Manual (Wash. Manual) and
the Corps of Engineers Wetlands Delineation Manual (1987 Manual) resulted in the
identification of one area that exhibited hydric soils, wetland hydrology, and hydrophytic
vegetation consistent with the established criteria of both the Wash. and 1987 Manuals.
This area had been impacted by prior forest harvest activities and grading and was
dominated by a mixture of deciduous trees and shrubs.
This assessment, completed in accordance with King County regulations, included an
evaluation of the function and value rating for the identified wetland, a classification of
the wetland following the U.S. Fish and Wildlife methods, and an identification of the
standard King County buffer width required for this ·wetland. Onsite assessment also
included an evaluation of the wildlife habitat availability and utilization. Species
presence and habitat utilization were evaluated following the methods identified by
Horner and Raedeke (1989) and within U.S. Fish and Wildlife Service Publication 80/58
(Mikol, 1980). In addition, the King County Wildlife Study Guidelines (Draft Wildlife
Management in King County, Issue Paper, 1993) were followed to assure consistency
with the King County permit process and documentation of habitat types.
WETLAND SIZE ONSITE CLASSIFICATION KING COUNTY FUNCTION STANDARD
(square feet) (USFWS) RATING AND VALUE BUFFER
RATING WIDTH
A 17,162 PFOE, PEME 2 low 50 feet
PFOE palustnne, forested, seasonally flooded/saturated
PEME palustrlne, emergent, seasonally flooded
The "habitat type" best represented within the site would be that of •young conifer
upland forest -low understory." This habitat type included three isolated freshwater
wetlands and a mixed freshwater wetland drainage corridor.
•
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 07
··-··
PRIMARY HABITAT TYPES INCLUDED MINOR HABITAT TYPES
Conifer Upland Forest Deciduous Forested wetland
. low understorv Aaricultural Lands
Persistent Lowland Shrub
The U.S. Army Corps of Engineers and King County, as well as a number of other local,
state, and federal agencies, regulate activities in and around identified wetland and
drainage corridor areas. Such regulations focus on the avoidance of adverse impacts to
wetlands, streams, associated buffers and the mitigation of such impacts that cannot be
avoided. King County has established criteria to categorize wetlands for purposes of
regulation and the establishment of buffers. In addition, King County allows a limited
amount of alterations to wetlands (i.e. isolated wetlands, roadway crossings) provided
such impacts are mitigated pursuant to an approved mitigation plan.
The Selected Action Plan of the Evendell project site focuses on the creation of
independent lots suitable for the development of single-family homesites consistent with
the King County Comprehensive Plan. Buffer averaging will be used along the western
boundary of the onsite King County Class 2 Wetland (I.e. Wetland A) as a part of this lot
creation. Such averaging will provide additional protection to wetlands and enhance the
wetland's functions. In addition, improvements to the existing right-of-way (South 136th
Street -a primary collector route for the area) which fronts the project along its northern
boundary will require the unavoidable filling of the northern 200 square feet of Wetland
A and the reduction of the buffer associated with this area of the wetland. Through
restoration of the existing onsite wetland, addition of buffer area along the eastern side
of Wetland A, and onsite erosion protections this unavoidable wetland intrusion will be
fully compensated, will enhance onsite wildlife habitats, and will not adversely impact
the remaining wetland area.
The GOAL of the wetland mitigation and buffer averaging plan is to ensure that
proposed site development actions (I.e. the improvement of an existing right-of-way to
meet King County health and safety standards) do not create a sh.art-term or long-term
adverse impact to the onsite wetland or associated buffer areas.
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 08
TABLE OF CONTENTS
INTRODUCTION ..................... u., ............... ,n,, ....................................... ,n,uouoo•••••••;··· .... 1
STUDY PURPOSE .................................................................................................... · 1
SITE DESCRIPTION ................................................................................................... 1
BACKGROUND INF.ORMATION ...•....... ; ........................................................................ 2
NATIONAL WETLAND INVENTORY MAPPING ......................................................... 2
STATE OF WASHINGTON PRIORITY HABITATS AND SPECIES ............................ 2
STATE OF WASHINGTON STREAM CATALOG ....................................................... 2
KING COUNTY SENSITIVE AREAS MAPPING ......................................................... 2
SOILS MAPPING ........................................................................................................ 2
AERIAL PHOTO ANALYSIS ....................................................................................... 3
ONSITE EVALUATION -WETLANDS ........................................................................... 3
WETLAND STUDY METHODS ................................................................................... 3
FIELD OBSERVATION ............................................................................................... 4
'.J Vegetation ..................................................................................... : ................. 4
c. Soils ................................................................................................................ 5
Ci Hydrology ........................................................................................................ 5
WETLAND AND STREAM DETERMINATION ............................................................... 6
WETLAND FUNCTION AND VALUE ASSESSMENT .................................................... 6
ONSITE WETLAND VALUATION ............................................................................... 8
ONSITE EVALUATION -WILDLIFE .............................................................................. 9
WILDLIFE STUDY METHODS .................................................................................. 9
ONSITE HABITAT TYPES ........................................................................ , .............. 10
PLANT AND ANIMAL SPECIES OBSERVATIONS .................................................. 10
MOVEMENT CORRIDORS ...................................................................................... 12
PRIORITY SPECIES ................................................................................................. 12
STATE CANDIDATE SPECIES ................................................................................ 12
REGULATORY CONSIDERATION .............................................................................. 12
U.S. ARMY CORPS OF ENGINEERS· SECTION 404 ............................................... 13
KING COUNTY -"ENVIRONMENTALLY SENSITIVE AREAS" ORDINANCE 21A.24 ............. 13
D Wetland and Stream Classes ........................................................................ 13
o Wetland/Stream Alteration ............................................................................. 14
D Roadway Improvements ................................................................................ 14
o Required Buffers ........................................................................................... 15
SELECTED ACTION PLAN ................................ ., ....................................................... 15
ELEMENTS OF THE COMPENSATORY MITIGATION PLAN ..................................... 16
DESCRIPTION OF THE COMPENSATORY MITIGATION PROGRAM .................... 17
GOAL AND OBJECTIVE OF THE MITIGATION PLAN ............................................. 18
PERFORMANCE CRITERIA ..................................................................................... 18
MITIGATION REPLACEMENT/ENHANCEMENT ..................................................... 19
SUMMARY TABLE OF WETLAND FUNCTIONAL BENEFITS ................................. 20
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 09
SELECTED PLANT COMMUNITIES ........................................................................ 20
CONSTRUCTION INSPECTION ............................................................................... 21
WATER QUALITY PROTECTIONS DURING CONSTRUCTION ............................. 22
CONSTRUCTION SEQUENCE ................................................................................ 22
PROJECT MONITORING ......................................................................................... 22
STANDARDS OF SUCCESS .................................................................................... 23
Vegetation Sampling Methodology and Monitoring Schedule ................................ 23
Vegetation Monitoring ........................................................................................... 23
Vegetation Monitoring Sequencing ............................. : .......................................... 24
.WILDLIFE OBSERVATIONS .................................................................................... 25
VEGETATION MAINTENANCE PLAN ...................................................................... 25
CONTINGENCY PLAN ............................................................................................. 26
PLANTING NOTES ....................................................................... , ........................... 26
FINANCIAL GUARANTEE ........................................................................................ 26
FIGURESREFERENCE LIST ..................................... ; ................................................. 27
REFERENCE LIST ....................................... : ............................................................. ,. 28
APPENDIX A .... ; ........................................................................................................... 29
APPENDIX 8 .................................................................................................................... 30
•
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 10
STANDARD OF CARE.
Prior to extensive site planning, this document should be reviewed and the wetland
boundaries verified by the appropriate resource and permitting agencies. Wetland
boundaries, wetland classifications, wetland ratings, and all proposed wetland
restoration and enhancement activities should· be reviewed and approved by King
County and potentially other regulatory staff. The above consultants have provided
professional services that are in accordance with the degree of care and skill generally
accepted in the nature of the work accomplished. No other warranties are expressed or
implied.· The consultant is not responsible for design costs incurred before this
document is approved by the appropriate resource and permitting agencies.
Mark Heckert
Senior Wetla.nd Ecologist
'
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 11
INTRODUCTION
This report details the culmination of activities and onsite evaluations undertaken to
complete both a wetlands evaluation and a wildlife habitats assessment as an element
of the planning and site development of the Evendell Project Site. The project area is
approximately 14 acres in total size and generally located within a quickly urbanizing
area east of the City of Renton, King County, Washington. The evaluation and
delineation of onsite and adjacent wetlands; drainage corridors, and wildlife habitats is a
vital element in the planning and selection of a site development action. The goal of this
approach is to assure that planned site platting does not result in adverse environmental
impacts to such areas.
Wetlands are generally defined as "those areas of King County that are inundated
or saturated by ground or surface water at a frequency and duration sufficient
to support, and that under normal circumstances do support, a prevalence of
vegetation typically adapted for life in saturated soil conditions."
(King County Environmentally Sensitive Areas).
STUDY PURPOSE
This purpose of this document is to present the results of the onsite assessment and
evaluation of the wetland/drainage corridor areas and the wildlife habitats within the
project area. Included within this report is an assessment of the proposed impacts and
compensatory actions to be taken to ensure that proposed onsite actions do not
adversely impact environmentally sensitive areas. This study was . designed to
accommodate site planning and potential regulatory actions. This report is suitable for
submittal to federal, state, and local authorities for wetland boundary verification and
permitting actions.
SITE DESCRIPTION
The project site is generally square in shape, approximately 14 acres in total size, and
located within a rapidly urbanizing area generally east of the City of Renton, King
County, Washington (Figure 1). The project site is comprised of two adjacent parcels;
Parcel A of 11.5 acres, and Parcel B of 2.5 acres directly to the west of Parcel A. The
Parcel A portion of the project site is dominated by a mature Douglas fir (Pseudotsuga
menziesi,) forest plant community on the periphery that has been planted following prior
forest haivest activities. A single-family dwelling is located in the northern portion of
Parcel A. The center of Parcel A has· been cleared and is dominated by a dense
canopy of Himalayan blackberries (Rubus procera). The southern portion of Parcel A is
dominated by active livestock pasture. Parcel B portion is dominated by an active
livestock pasture which also contains a single-family dwelling and four associated
buildings.
Evendell -1
WetlandNVBdlife Report. 00062
·>
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 12
The project site is generally flat and rolling and a narrow drainage corridor area is
present generally through the northeast corner of tlie Parcel A portion of the site. This
narrow drainage corridor had been impacted by prior forest harvest actions (i.e.
clearing, harvest, roadways, slash piles), and subsequent clearing and grading as part
of homesite development activity. Surface drainage within this corridor is conveyed as
overland flow to tl1e southeast to the ditch that runs south along the western side of
1601h Avenue South. However, there is no evidence onsite of a continuous stream
channel.
BACKGROUND INFORMATION
NATIONAL WETLAND INVENTORY MAPPING
The National Wetland Inventory (NWI) mapping completed by the U.S. Fish and Wildlife
Service was reviewed as a part of this assessment. This mapping resource did not
identify any wetlands or drainage corridors on the project site. (Figure 2).
STATE OF WASHINGTON PRIORITY HABITATS AND SPECIES
Tl1e State of Washington Priority Habitats and Species (PHS) Mapping was reviewed as
a part of this assessment. This mapping resource did not identify any Priority Habitats
or Species orisite or within the immediate vicinity.
STATE OF WASHINGTON STREAM CATALOG
The State of Washington Stream Catalog for Puget Sound was reviewed as a part of
this assessment. This mapping resource did not identify any streams within the project
site. This mapping did identify the Green River to the south of the project site. The
Green River was identified to provide habitat for a number of anadromous and resident
salmonid fish species.
KING COUNTY SENSITIVE AREAS MAPPING
The King County Sensitive Areas Mapping was reviewed as a part of this assessment.
This mapping resource did not identify any wetland areas or streams within or adjacent
to the project site. (Figure 3).
SOILS MAPPING
A review of the mapping of soil types within the project area completed by the U.S. Soils
Conservation Service (SCS) identified that the onsite soils consist primarily of
Evendell -2
Wetland/Wildlife Report· 00062
.,
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 13
Alderwood gravelly sandy loam (Soils Survey of King County Area Washington, Nov.
1973) (Figure 4). This soil is described as:
Age -Alderwood gravelly sandy loam: This series consists of moderately well
drained soils that have a weakly consolidated to strongly consolidated
substratum at a depth of 24 to 40 inches. This soil is on uplands and formed
in glacial deposits. A typical pedon of Alderwood soils from O -12 inches is
dark brown (10YR 4/3) gravelly sandy loam. From 12 to 27 inches the soil is
grayish-brown (2.SYR 5/2) gravelly sandy loam with many medium, distinct
mottles. This soil series is not listed as a hydric soil.
AERIAL PHOTO ANALYSIS
Recent aerial photos of the project site were used within the background data collection
process. These aerial photos identified that a coniferous forest plant community which
has been altered by prior forest harvest actions dominated the majority of the project
site. A deciduous forest/shrub community was identified to pass generally within a
narrow corridor north to south through the central portion of the project site. This
deciduous forest/shrub community appeared to continue offsite to the south until
reaching the top of slope leading in the Green River Valley. A few small pockets also
dominated by a deciduous forest/shrubs were present in the north-central and west
central portions of the site. The project site was within an area of large-Jot single-family
homesites and a number of internal roadways were present through the site.
ONSITE EVALUATION -WETLANDS
WETLAND STUDY METHODS
Presently accepted wetland identification is based on a three parameter criteria test as
established within both the Corps of Engineers Wetlands Delineation Manual (1987
Manual) and the Washington State. Wetlands Identification and Delineation Manual
(Wash. Manual). These criteria are:
1. A predominance of hydrophytlc vegetation.
2. The presence of hydric soils, and
3. The presence of wetland hydrology.
Initial onsite assessment and evaluation was completed during several site visits in
June and. July 2000. Specific identification of wetland boundaries was completed on
July 17, 2000. Assessment transects were established on a north/south pattern through
the project area. Wetland assessment within the project site followed the methods and
procedures outlined in both the Wash. Manual and the 1987 Manual. Onsite
assessment noted that there were no differences in the identified wetland boundaries as
a result to using either the Wash. Manual or the 1987 Manual. Drainage corridors were
Evendell -3
Wetland/Wildlife Report -00082
' .
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 14
assessed and identified in accordance with the criteria established by King County and
the State of Washington Department of Natural. Resources (WDNR) Forest Practice
Rules (WAC 222-16-030).
The boundary between wetland and non-wetland areas was established by examining
the transitional gradient between wetland criteria along transects through the site.
Delineation was performed using the routine methodology for areas greater than five
acres as detailed in the 1987 Manual. Field data sheets are provided in Appendix A.
Identified boundaries were marked in the field with number flagging. These boundaries
were then surveyed and made a part of the site plan mapping.
FIELD OBSERVATION
o Vegetation
·A mature coniferous forest plant community that had been planted following prior forest
harvest actions dominated approximately two-thirds of the project site. The dominant
onsite species was Douglas fir (Pseudotsuga menziesi,). These mature trees formed
open stands across the treed portion of the site. Additional tree species occurring
onsite included Westem red cedar (Thuja p/icata), Western hemlock (Tsuga
heterophylla), big leaf maple (Acer macrophy/lum), red alder (A/nus rubra), black
cottonwood (Popu/us trichocarpa), cherry (Prunus spp), and cascara (Rhamnus
purshiana).
The understory included a wide variety of shrubs and herb species including vine maple
(Acer circinatum), salal (Gaultheria shallon), Oregon grape (Berberis spp.), hazelnut
(Cory/us comuta), salmonberry (Rubus spectabilis), Scot's broom (Cytisus scoparius),
Himalayan blackberry (Rubus procera), evergreen blackberry (Rubus /aciniatus), Pacific
red elderberry (Sambucus racemosa), snowberry (Symphoricarpus a/bus), bracken fern
(Pteridium aquilium). and sword fern (Polystichum munitum). Throughout the project
site this plant community had been altered by prior forest harvest actions. This plant
community was identified as non-hydrophytic (i.e. typical of non-wetlands).
The central area of Parcel A was dominated by dense stands of Himalayan blackberry.
This area had apparently been cleared of the tree canopy in the recent past, and the
blackberry had colonized after the clearing.
The plant community within the central drainage corridor (Wetland A) that was identified
to generally pass from north to south through the site was dominated by a young, mixed
deciduous forest and emergent plant community. This plant community had also been
altered by prior forest harvest and grading actions which had removed the mature trees,
created slash piles, and created an internal drag-road across this drainage. Observed
tree species included sapling red alder, Western red cedar, black cottonwood, Oregon
ash (Fraxinus latifolia), and Pacific willow (Salix /ssiandra). The understory was dense
and included salmonberry, Douglas spiraea (Spiraea doug/asil), Western crabapple
(Pyrus fusee), Sitka willow (Salix sitchensis), slough sedge (Carex obnupta),horsetail
Evendell-4
Wetland/Wildlife Report. 00062
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 15
(equisetum arvensis), buttercup _ (Ranunculus repens), reed canarygrass (Phalaris
arundinacea), softrush (Juncus effusus), and lady fern (Athyrium filix-femina). This
plant association was identified as hydrophytic in character (i.e. typical of wetlands).
o Soils
As identified by numerous sample plot$ throughout the project site, the majority of the
site exhibited a soil profile typical of the Alderwood _soil series. The soil was defined as
gravelly sandy loam with a soil matrix color of dark brown (10YR 3/3) to brown (10YR
4/4). These soils did not exhibit redoximorphic features such as prominent soil mottles,
oxidized root channels, or glayed soil layers within the first 20 inches of soil depth. The
majority of the project site exhibited soil which would not be considered "hydric."
Representative sample plots are identified on Figure 4. (Special note -many more
sample plots were completed during the field assessment than are shown within Figure
4 or reported within Appendix A).
Sample plots within the defined drainage corridor that was identified to generally pass
from north to southeast through the northeast corner of the site exhibited a mixed
gravelly loam soil texture. These soils appeared to be mineral in character. Soils
ranged in color from very dark brown (10YR 3/1) to dark grayish brown (10YR 4/2).
Redoximorphic features were present and often very prominent. Soils within these
areas exhibited "hydric" characteristics.
o Hydrology
Onsite hydrology appeared to be the result of seasonal stormwater runoff from onsite
and adjacent properties. In addition, the pattern of surface water movement appeared
to have been modified by prior land use activities. These activities have included the
development of offsite homesites, the development of roadways and. utilities, and the
placement of culverts.
The general movement of surface water runoff across the site was generally to the
south. The movement of surface water through the central drainage corridor did not
form a continuous drainage pattern and no areas within these swales exhibited
characters typical of a "stream." This area had also been impacted by an internal
roadway and draglines and logging slash piles. Based on field indicators (i.e. water
stained leaves, drift lines, surface water, soil saturation, oxidized root channels, wetland
drainage pattern) this drainage corridor met the wetland hydrology criteria of the 1987
Manual and the Wash. Manual.
Wrthin an area located in the north-central portion of the site, directly south of the
homesite and past the edge of the landscaping, pooled water was also documented.
This area was in a small, isolated depression, and had been impacted by prior land use
actions (i.e. root pull up, slash pile, compaction). However, based on field indicators
(i.e. water stained leaves, drift lines, soil saturation, oxidized root channels, wetland
Evendell-5
WetlandNl/ildlife Report· 00062
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 16
drainage pattern) these isolated depressions met the wetland hydrology criteria of the
1987 Manual and the Wash. Manual.
WETLAND AND STREAM DETERMINATION
Wetland determination was based on sample plots which contained hydrophytic
vegetation, hydric soils, and wetland hydrology in accordance with the 1987 Manual and
the Wash. Manual. Based on these methods one wetland area was identified onsite
(Figure 4). No area was identified onsite to exhibit characters typical of a "stream· (i.e.
a continuous pattern of surface water movement, either permanent or intermittent).
WETLAND SIZEONSITE CLASSIFICATION KING COUNTY FUNCTION STANDARD
(square feet) (USFWS) RATING AND VALUE BUFFER
RATING WIDTH
A 17.162sqft PFOE, PEME 2 low 50 feet
PFOE palustnne, forested, seasonally flooded/saturated
PEME palustrine, emergent, seasonallY,flooded
Wetland A: This wetland was identified within a topographic drainage that passed
generally from the central northern boundary to southeast through the northeast corner
of the project site. · This wetland complex was dominated by a young, mixed deciduous
forest and emergent community that had formed following prior forest harvest and
grading activities. This plant community was very dense in the southern end and open
on the north end. This wetland complex exhibited shallow ponded surface water during
the winter and early growing season as a result of topography, the internal logging road
and draglines, a created berm, and an offsite roadway culvert. Soil saturation to the
surface was noted to occur within a majority of this wetland complex into the early part
of the growing season. As noted by a slash pile within this area forest harvest activities
had been undertaken within this wetland complex. This wetland plant community ended
adjacent to, but separated from, the roadside berm to 1601h Avenue South to the south.
Wetland A was identified to meet the U.S. Fish and Wildlife Service (USFWS) criteria for
classification as palustrine, forested, seasonally flooded(PFOC) and palustrine,
emergent, seasonally flooded/saturated (PEME). Based on the young ·forested plant
community this wetland complex was identified to meet the criteria for designation a
King County Class 2 Wetland.
WETLAND FUNCTION AND VALUE ASSESSMENT
Wetlands are known to perform significant roles in the ecosystem, some of which are of
immediate value to society. These roles vary greatly with the size, type, hydrology,
vegetation, and location of wetland areas. Although.the ecological functions performed
by this wetland are complex, interrelated, and difficult to assess and quantify, methods
Evende/1-6
Wetland/Wildlife Report -00062
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 17
have been developed for the U.S. Army Corps of Engineers (Adamus et al. 1987:
Reppert etal. 1979). The functions provided by wetlands include hydrologic support,
shoreline protection, stormwater and floodwater storage, water quality, groundwater
recharge, and provision of wildlife habitat.
The HYDROLOGIC SUPPORT FUNCTION is defined by the measure of
hydrologic stability and environmental integrity which the wetland provides. This
function is measured by the frequency of inundation and saturation by tidal
actions, stream flow, runoff, and precipitation. Wetlands permanently inundated
or saturated, or intertidal wetlands are valued as high. Medium valued wetlands
are seasonally flooded or are open water systems that remain saturated during
most of the growing season. Wetlands that are intermittently flooded or
hydrologically isolated are considered of low value.
The SHORELINE PROTECTION FUNCTION is defined by the measure of
shielding from wave action, erosion, or storm damage which a wetland provides.
This function is measured by the location and width of the wetland along
shoreline areas, types of vegetation present, and the extent of development
along the shoreline. A high value is given to wetlands along a shoreline that
have a width greater than 200 yards and dense woody vegetation. A medium
value is given to a wetland with a width of 100 to 200 yards, sparse woody
vegetation, and dense emergent vegetation. Wetlands less than 100 yards in
width and emergent or lacking vegetation are considered of low value.
The STORMWATER AND FLOODWATER STORAGE FUNCTION is defined by
the ability of a wetland to store water and retard flow during periods of flood or
storm discharge. Wetlands of larger size are generally considered to have
greater ability to provide this function. In addition, wetlands nearer to urban or
potentially develop-able areas are also considered to provide greater flood
protections than wetlands which are in undeveloped areas.
The WATER QUALITY FUNCTION is defined by the physical, biological, and
chemical processes which wetlands provide to naturally purify water. This
function removes organic and mineral particulates through natural filtration. In
general, wetlands of greater size, more dense vegetation, and those which are
close to point sources of pollution are considered to be of higher value.
Wetlands which are small (<5 acres), lacking dense vegetation, and not close ta
point or non-point sources of pollution are considered of low value.
The GROUNDWATER RECHARGE FUNCTION is defined by the interaction of
the underlying geology and soils, and the surface topography. This function
provides for the movement of surface water into groundwater systems. Important
to this function is wetland size, period of inundation, and depth of standing water
within the wetland. High value is given to permanently inundated wetlands
greater than 10 acres in size. Medium value is given to wetlands which are
Evendell-7
WetlandNVildlife Report -00062
•
05/10/2004 15:08 2535390514 SDUNDBUILT HOMES PAGE 18
seasonally flooded and 5 to 10 acres is size. Wetlands less than 5 acres in size,
isolated, and temporarily saturated are considered of low value.
The NATURAL BIOLOGICAL FUNCTION is defined by the complexity of
physical habitats and biological species within the wetland area. The value given
to a wetland depends upon its ability to provide habitat for nesting (spawning),
incubation, feeding, rearing, and cover of aquatic and terrestrial animal and fish
species. In addition, the ability of a wetland to provide support for varying food
chains is an important element in value assessment. Wetlands of high species
diversity, three or more habitat types, unique habitat features, large in size, and .
associated with a permanent stream or tidal marsh are considered of high value.
Wetlands with moderate species diversity, two habitat types, moderate in size,
and associated with an intermittent stream or high salt marsh are considered of
medium value. A low value is given to wetlands of low species diversity, small
size, and isolated.
These six functions are rated low, moderate, or high, based on the criteria outlined
above. These criteria are guidelines compiled from Adamus (1987)and Reppert (1979)
and professional judgment must be exercised in assessing these criteria. Overall
values for a wetland are assigned, based on a synthesis of individual values. In
addition to intrinsic functions, extrinsic functions are also recognized. These extrinsic
functions provide social values that have indirect benefits to wetlands. Education and
recreational opportunities are most often mentioned as extrinsic functions. Associated
values are often subjective and are thus difficult to evaluate. As such, these functions
are not rated, but are nonetheless important when considering creation, restoration, or
enhancement projects.
ONSITE WETLAND VALUATION
Following the function and value assessment process noted above Wetland A was rated
as exhibiting a low rating:
0 Water Quality Benefits -This wetland was small, isolated, and had been
impacte_d by prior forest harvest and clearing. This wetland appeared to
retain less than 25% of the runoff which occurred within the local area. This
wetland also exhibited a limited vegetation density as a result of prior forest
harvest and grading. The primary water quality benefit provided by this
wetland was a very limited amount of biofiltration of surface stormwater.
o Stormwater Storage -This wetland appeared within a topographic
depression and had been impacted by prior land uses. This wetland was
located in a rapidly developing part of King County. This wetland was small
and exhibited a very limited ability to store stormwater.
Evendell-8
Wetland/Wildlife Report -00062
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 19
o Hydrologic Support -This wetland appeared small, isolated, and to pond a
limited amount of surface water early in the growing season. Evidence of
seasonal ponding and saturation to the surface was limited.
o Groundwater Recharge -This wetland appeared small, isolated, and to
pond a limited amount of surface water early in the growing season.
Evidence of seasonal ponding and saturation to the surface was limited.
o Natural Biological Function · This wetland was small, isolated, and
exhibited a very limited range of plant diversity and vegetation complexity.
Available habitat was dominated to young deciduous trees and a dense .shrub
community. Unique habitat features (i.e. snags, fallen trees, mature trees
along the wetland boundary) were absent. This wetland included a large
slash pile resulting from prior forest harvest.
ONSITE EVALUATION -WILDLIFE
WILDLIFE STUDY METHODS
The onsite assessment of wildlife species presence and available wildlife habitats was
completed as a part of the onsite assessment of wetland characteristics. This
assessment included both early morning and late afternoon observations. Species
presence and habitat utilization were evaluated following the methods identified by
Horner and Raedeke (1989) and within U.S. Fish and Wildlife Service Publication 80/58
(Mikol, 1980). In addition, the King County Wildlife Study Guidelines (Draft Wildlife
. Management in King County, Issue Paper, 1993) were also followed to assure
consistency with the King County permit process and documentation of habitat types.
Onsite activities documented observations of individual species presence, the general
location of the species sighting, and the life history activity being undertaken. Sample
stations were established within the site for these observations. This range of
observations were documented because for many of the smaller, less mobile species
(i.e. small mammals, amphibians) the project site may provide all of their life history
requirements (nesting, cover, feeding, and reproduction) while for the more mobile
species (i.e. waterfowl, songbirds, medium sized mammals) the project site may be
used for only a few of the life history requirements. These more mobile species may
depend more upon adjacent habitat for more critical habitat needs such as nesting and
cover from predators. It is unlikely based upon the existing site conditions, coupled with
adjacent land uses, that species which require large areas of undisturbed habitat would
exist onsite.
Evendell-9
Wetland/Wildlife Report. 00062
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 20
ONSITE HABITAT TYPES
The site exhibited one primary habitat type that had been manipulated as a part of past
land use activities. An upland coniferous forest plant community dominated this primary
habitat type. This plant community had been retained following prior forest harvest
activities. Included within this primary habitat type were two additional habitat types.
As defined by King County, the "habitat type" best represented within the site was
"Conifer Upland Forest -low understory. • The primary tree within this habitat type is
Douglas fir that is 80 to 200 years old with a well developed understory. One additional
habitat type was Persistent Lowland shrub. This upland habitat type has been
manipulated and modified by prior forest harvest activities. In parcel B, and in the
southern portion of parcel A, the areas were developed into active pastures, and qualify
as Agricultural lands under the County designation. The adjacent properties also
exhibited similar land use actions along with the development of single family
homesites.
The "deciduous forested wetland" habitat type was identified as present within the
central drainage corridor (Wetland A). This habitat type had also been impacted by
prior forest harvest activities and adjacent land uses. This habitat type included young
deciduous trees (i.e. red alder, black cottonwood, Oregon ash, Pacific willow) and a
wide variety of shrubs and herbs (i.e. Douglas spiraea, salmonberry, willows, sedges,
rushes, reed canarygrass, lady fern, buttercup).
PRIMARY HABITAT TYPES INCLUDED MINOR HABITAT TYPES
Conifer Upland Forest Deciduous Forested wetland
-low understorv . Aaricultural Lands
Persistent Lowland Shrub
PLANT AND ANIMAL SPECIES OBSERVATIONS
Conifer Upland Forest: The majority of the 14-acre project site was identified to be
dominated by a coniferous upland forest plant community. Total crown cover exceeded
60 percent. The primary tree species was Douglas fir that had been retained following
prior forest harvest. Additional tree species include Western hemlock, big leaf maple,
western red cedar, hawthorn, cascara, black cottonwood, and red alder. The
understory was dense and composed of a wide variety of shrubs and herbaceous
species. Avian species observed within this coniferous upland forest habitat type
included tree swallow (Tachycineta bicolor}, song sparrow (Melospiza melodia), dark
eyed junco (Junco hyema/is), American crow (Corvus brachynchos), American robin
(Turdus migratorius), golden crown kinglet (Regulus satrapa), bushtit (Psaltriparus
minimus), house finch (Passer domesticus), Steller's jay (Cyanocitta ste/fen), pine siskin
(Cardue/is pinus), black-capped chickadee (Parus atricapillus), brown creeper (Certhia
americana), ruffed grouse (Bonasa umbelfus). varied thrush (lxoreus naevius), rufous
sided towhee (Pipi/o erythrophtha/mus), Northern flicker (Co/aptes auratus), and hairy
woodpecker (Picoides vi//osus). These avian species were feeding throughout this
Evendell -10
Wetland/Wildlife Report • 00062
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 21
habitat type with the greatest number of observations noted along the edge between
this upland forested habitat type and the mixed wetland areas. This habitat type also
appeared to provide cover to many species that also used the adjacent areas,
particularly the residential areas.
A number of nests were observed onsite and appeared to have been used during the
2000 breeding season. A limited number of stumps and snag trees are present within
this plant community. These stumps and snags appeared well utilized as feeding areas
by a wide variety of avian species, particularly hairy woodpeckers, creepers, and
Northern flicker. A few of these snags also exhibited a limited use by pileated
woodpecker (Drpocopus pileatus).
Mammal species observed within this habitat type included deer mouse (Peromyscus
manicufatus), shrew (Sorex spp.), opossum (Dide/phis virginianus), Douglas squirrel
(Tamiasciurus dougfasii), mountain beaver (Aptodontia rufa), raccoon (Procyon lotor),
and black tailed deer (Odocoileus hemionus).
Freshwater Deciduous Wetland: A deciduous wetland area was identified to pass
generally from north to southeast through the northeastern portion of the project site.
This wetland represented less than 5% of the total project area, had been greatly
modified by prior forest harvest activities, and was dominated by a young mixed forest
composed of red alder, black cottonwood, and Pacific willow trees. Crown cover
exceeded 50% in some areas where dense thickets of sapling red alder trees, Douglas
spiraea, and salmonberry dominated. The northern portion of this area had been
cleared and graded and .was dominated by herbaceous species. This grading has
enhanced an existing swale that ran through the property.
Avian species observed within this freshwater wetland habitat type included tree
swallow, violet green shallow (Tachycineta thal/assina), barn shallow (Hirundo rustica),
song sparrow, dark eyed junco, American crow, American robin, golden crown kinglet,
house finch, Stelle r's jay, pine sis kin, black-capped chickadee,· rufous sided towhee,
Northern flicker, pileated woodpecker, and hairy woodpecker. These avian species
were noted to use the "edge" between the mixed wetland habitat type and the upland
young conifer forest habitat type. Many of these avian species were feeding, nesting,
and seeking cover either within the forested portions of this wetland habitat type or
within the adjacent upland forest plant community.
This wetland plant community included . a number of downed logs and a-slash pile.
These habitat features were noted as heavily used as feeding areas·, cover, and
perches. A number of small cavities were also noted to be used by swallows.
Mammal species observed within this habitat type included deer mice, opossum, black
tailed deer, and raccoon.
E11endell -11
Wetland/Wildlife Report -00062
•
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 22
Pacific tree frogs (Hyta regilla) were also noted within this habitat type. As identified the
apparent length of surface water ponding resulting from water retention by the wetland
would be inadequate to provide spawning habitat for this species.
MOVEMENT CORRIDORS
As identified by onsite wildlife trials, small and medium size mammals appeared to be
moving throughout the project site and into the adjacent areas. The larger of these
trails (many of which are loggir:ig roadways and draglines) also appeared to be used by
domestic cats, domestic dogs, horses, and neighbors. Wetland A also appeared to
serve as a movement corridor for a wide variety of wildlife species.
PRIORITY SPECIES
Two wildlife species identified by the State of Washington as "Priority Species" were
observed onsite during this assessment. Black tailed deer and ruffed grouse are noted
by the State of Washington as a "priority species" because these species are regulated
as "game" species. The project site may also provides suitable habitat for other game
species such as mourning dove (Zenaida marroura) and band-tailed pigeon (Columba
fascfata).
STATE CANDIDATE SPECIES
A single "State Candidate" species -the pileated woodpecker -was observed to utilize
the forested wetland area along with the adjacent upland forested areas onsite. State
candidate species are presently under review by the State of Washington Department of
Fish. and Wildlife (WDFW) for possible listing as endangered, threatened, or sensitive.
WDFW has developed a list of recommendations for management of the pileated
woodpecker that focused on the preservation of nesting habitat. As defined by WDFW
the most popular nest trees are typically hard snags with bark and broken tops within
riparian areas. ,
REGULATORY CONSIDERA TIOI\I
The proposed alteration of lands defined by various federal, state, and local authority
rules and regulations as "wetlands" raises environmental concerns that are generally
addressed in the development review process. These concerns center around the
development's potential adverse impacts to the structure, function, value,· and size of
these "wetland" areas. Such adverse impacts may include a reduction in wildlife
habitats, reduced surface water quality, reduced water retention, a reduced ground
water recharge rate, reduced plant species diversity, and the reduction in the function
and value of other associated wetland and non-wetland characteristics.
Evendell -12
Wetland/Wildlife Report -00062
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 23
U.S. ARMY CORPS OF ENGINEERS -Section 404
Section 404 of the Clean Water Act (33 U.S.C. 1344) prohibits the discharge of dredged
or fill material into 'Waters of the United States" without a permit from the Corps of
Engineers (Corps). The Corps has jurisdiction over freshwater systems waterward from
the ordinary high water line of a water body or waterward from the upland boundary of
the adjacent wetland. The definition of fill materials includes the replacement of aquatic
areas with dry land, grading which changes the surface contour of a wetland, and
mechanized land clearing in wetlands. For the purposes of Section 404 permitting the
Corps makes the final determination as to whether an area meets the wetland definition
and would be subject to regulation under the Corps program.
Currently the Corps has two specific types of permits which apply to wetland fill
proposals. These two types are a series of specific Nationwide Permits and the
Individual Permit. The Nationwide Permit process identifies specific categories of
work that can be undertaken following a set of specific conditions applicable to each
Nationwide Permit number. For example; NWP#12 allows for the limited, short term
impacts to wetlands for the placement of utilities, and NWP#14 allows for a limited
impact to wetlands as a part of the development of a roadway crossing. The Corps has
noted several times within information papers, documents, and workshops that a project
proponent that places fill within a wetland without specific Corps authorization does so
at the proponent's own risk.
The Corps requires an Individual Permit where a proposed activities within an
identified jurisdictional wetland area can not be.authorized under one of the Nationwide
Permits. Within the Individual Permit process the Corps undertakes a much more in-
depth review of the proposed project and the proposed impacts. The Corps must
evaluate whether the benefits derived from the project outweigh the foreseeable
environmental impacts of the project's completion. ·
KING COUNTY -"Environmentally Sensitive Areas" Ordinance 21A.24
• Wetland and Stream Classes
King County regulates activities in and around wetland areas. Such regulations also
require that an undisturbed native vegetation buffer be retained along the upland side of
the identified wetland areas. To assist in this regulation the County has defined classes
by which to regulate wetlands, streams, and their associated buffer area. These
categories are based on such features as size; the presence ·of endangered or
threatened plants, fish, or animals; regionally rare wetlands; wetlands of local
significance for wildlife or stormwater functions; the number of wetland classes and
subclasses; and percentage of open water.
A Class 1 Wetland means a wetland assigned the Unique/Outstanding rating in the
King County Wetlands Inventory, or any wetland which meets any of the
following criteria:
Evendell -13
Wetland/Wildlife Report • 00062
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 24
'·-·
1. The presence of species listed by the federal government or state as
endangered, or threatened, or the presence of critical or outstanding actual
habitat for those species; · .
2. Wetlands having 40% to 60% permanent open water in dispersed patches
with two or more classes of vegetation;
3_ Wetlands equal to or greater than ten acres in size and having three or more
wetland classes, one of which is open water; or
4_ The presence of plant associations of infrequent occurrence.
A Class 2 Wetland means a wetland assigned the Significant #2 Rating in the King
County Wetlands Inventory; or any wetlands which meet any of the following
criteria:
1. Wetlands greater that one acre in size;
2: Wetlands equal to or less that one acre in size and having three or more
wetland classes;
3. Wetlands equal to or less than one acre that have a forested wetland class;
4. The presence of heron rookeries or raptor nesting trees_
A Class 3 Wetland· means a wetland assigned a Lesser Concern #3 Rating in the
King County Wetlands Inventory, 1983, or uninventoried wetlands that area equal
to or less than one acre in size and that have two or fewer wetland classes.
A Class 3 Stream means those streams that are intennittent or ephemeral during
years of normal rainfall and are not used by salmonids.
• Wetland/Stream Alteration
King County allows a limited amount of alterations to wetlands provided all impacts are
mitigated pursuant to an approved mitigation plan. For example, on a site larger than
20 acres in size, up to three isolated wetlands may be altered by combining their
functions into one or more replacement wetlands pursuant to an approved mitigation
plan (21A.24.330.K)_ The County defines an "isolated wetland" as those Class 3
Wetlands whose total size is less than 2,500 square feet and which area hydrologically
.isolated from other wetlands or streams.
• Roadway Improvements
King County will allow a roadway to cross a wetland or associated buffer where the
following are met (21A.24.330.N):.
1. King County determines that no alternative access is practical;
2. all crossings minimize impact to the wetland and provide mitigation for
unavoidable impacts through restoration, enhancement, or replacement of
disturbed areas; ·
Evendell • 14
Wetland/Wildlife Report -00062
'
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 25
3. crossings do not change the overall wetland hydrology;
4. crossings do no diminish the flood storage capacity of the ~etland; and
5. all crossings are constructed during summer low water periods.
o Required Buffers
King County has established a standard buffer to be applied to a wetland or stream to
assure protection of the wetland function and value. This buffer area is measured
perpendicular to the defined wetland edge or perpendicular to the identified ordinary
high water mark of a stream.
WETLAND CLASS STANDARD BUFFER WIDTH
1 100 feet
2 50 feet
3 25 feet
King County allows the standard buffer to be modified where such actions would
provide additional protection to wetlands or enhance the wetland's functions
(21A.24.320.B). Buffer averaging may be allowed as long as the total area contained in
the buffer on the development proposal site does not decrease and the minimum width
of the final buffer is not less than 65% of the standard buffer width.
SELECTED ACTION PLAN
The Selected Action Plan of the Evendell Residential Community focuses on the
creation of independent lots suitable for the development of single-family homesites
consistent with the King County Comprehensive Plan. An essential element of this
process is the development of access roadways and utility corridors which both meet
King County health and safety standards and meet the goal of avoidance and
minimization of potential short-term or long-term adverse impacts to aquatic
environments.
A primary feature in the creation of these homesite lots will be the establishment of a
protective buffer adjacent to the identified onsite wetland consistent with the King
County Environmental Sensitive Areas Ordinance. The creation of these homesite lots
will not require the adverse impact or placement of fill within identified wetland areas.
To provide additional protection for the onsite wetland, the buffer in the northwest corner
· will be increased by the addition of 15,495 square feet. Through averaging, the buffer
on the west side of the wetland will be reduced to 32.5 feet, a total of 9,340 square feet.
Through buffer averaging these unavoidable intrusions into the standard buffer areas
will be fully compensated and will not adversely impact the adjacent wetland areas.
) The development of this residential community will require the creation of a public
roadway access by extending the existing 1581h Avenue South roadway which presently
Evendell -15
Wetland/Wildlife Report -00062
. ,
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 25
ends at Southeast 136th. In addition, site development requires improvements to the
existing right-of-way (SE 135th Street -a primary collector route for the area) which
fronts the project along its northern boundary. This will require the unavoidable filling of
the northern 200 square feet of Wetland A and the reduction of the buffer associated .
with this area of the wetland by 4,649 square feet. Through restoration of the existing
onsite wetland, additional of buffer area along the eastern side of Wetland A, and onsite
erosion protections these unavoidable intrusions into the wetland and standard buffer
areas will be fully compensated and will not adversely impact the remaining wetland
area .
ELEMENTS OF THE COMPENSATORY MITIGATION PLAN
Site planning for the Evendell Residential Community project site has focused on the
mandated hierarchy of wetland impact reduction: 1) avoidance, Z) minimization, and
3) compensation. These avoidance and ;minimization strategies included a site design
to reduce impacts to onsite wetland systems .
. The total amount of wetland area to be unavoidably modified by this project equals 200
square feet. As compensation for this unavoidable impact to Wetland A resulting from
the development of SE 136th Street approximately 4,000 square feet of existing
degraded wetland area will be enhanced through the planting of native trees and
shrubs. The presently degraded buffer adjacent to the restored wetland area will also
be restored and enhanced.
Through buffer averaging the final protective buffer will be established to ensure that
there is no reduction in the total area of buffer onsite and that the final buffer enhances
the on site wildlife habitats and greater long-term protection of the wetland.
PROJECT EL.EMENT IDENTIFIED IMPACT
Reduction of the standard 50 9,340 sqft of buffer
fool buffer along the western eliminated
edge of Wetland A to 32.5
feet.
Elimination of 4,649 square 4,649 sqfl of buffer
feet of buffer along the eliminated
northern edge of Wetland A
to develop SE 136th Street.
Elimination of 200 square feet 200 sqft of wetland
of buffer along the northern eliminated
edae of Wetland A to develop
COMPENSATION PROVIDED
10,000 square feet of buffer will be
added to the eastern side of Wetland A.
This addition of buffer will provide
greater protection to the wetland
through the addition of mature trees
and a very dense vegetation
communitv
5,495 square feet of buffer will be
added to the eastern side of Wetland A.
This addition of buffer will provide
greater protection to the wetland
through the addition of mature trees
and a very dense vegetation
community
The existing degraded part of Wetland
A onsite will be enhancement with the
Planting of native trees and shrubs.
Evendell-16
Wetland/Wildlife Report • 00062
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 27
I SE 1361" Street.
DESCRIPTION C>F THE COMPENSATORY MITIGATION PROGRAM
1. As compensation for the unavoidable impact to 200 square feet of onsite King
County Class 2 Wetland a presently degraded area of wetland adjacent the existing
homesite equal to 4,000 square feet will be restored. Wetland restoration will be
accomplished through the planting of native trees and shrubs. In addition, site
design will ensure that there will be no adverse changes in the existing wetland
hydrology patterns (Attachment 1).
2. The buffer associated with the identified onsite wetland will be established and
identified onsite. The width of the protective buffer area shall be averaged so the
total square footage surrounding the buffer does not decrease and that additional
protection to the wetland is provided. Along the western buffer boundary the buffer
width will be reduced to 65% of the standard buffer width for a Class 2 Wetland, to
32.5 feet as measured perpendicular for the identified wetland boundary. For the
eastern buffer boundary, the buffer width will be increased to a maximum of 100
feet, and will encompass the entire comer to the project site. Once identified the
wetlands and associated buffers will not be adversely modified by future land use
actions.
3. As a part of the development of the required roadway improvements the actual
encroachment into buffer area of Wetland A will be held to the minimum necessary
to meet County roadway requirements along the SE 1361h Street Corridor. Following
placement of the roadway improvements the roadway side slope within the buffer
areas will be seeded with the defined grass seed mixture (Attachment 1).
4. As compensation for the unavoidable encroachment into the buffer associated with
Wetland A as a part of the development of SE136th Street the standard buffer along
the east side of this wetland will be increased. This buffer width increase is
designed enhance the . wetland's function through improved visual and auditory
blockage from the street crossing and greater wildlife habitat opportunities.
5. As a part of the development of the required roadway improvements the actual
encroachment into buffer area of Wetland A will be held to the minimum necessary
to meet County roadway requirements along.the SE 1361h Street Corridor. Following
placement of the roadway improvements the roadway side slope within the buffer
areas will be seeded with the defined grass seed mixture (Attachment 1).
6. All onsite activities will be monitored by the onsite biologist. The onsite biologist
shall identify planting locations and planting patterns within the restored wetland and
buffer. Following the completion of onsite planting activities a "record-drawing" plan
will be prepared and submitted to King County .. A five-year monitoring program will
be undertaken to assure the success of the compensatory mitigation plan. A project
Evendell -17
Wetland/Wildlife Report -00062
'
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 28
financial guarantees will also be implemented to assure that the proposed work is
completed and is successful.
7. Temporary and long-term erosion control measures will be implemented .. These
measures include silt fencing during site preparation and wetland construction, and
seeding of exposed soil areas.
B. The outer boundary of the wetland buffer will be marked and fenced to limit intrusion
into these areas.
GOAL ANO OBJECTIVE OF THE MITIGATION PLAN
The GOAL of the Compensatory Mitigation Plan is to fully compensate for the
unavoidable adverse impact to 200 square feet of wetland area and to enact a buffer
averaging program that provides greater protection to the onsite wetland. This wetland
area meets the criteria for designation as a King County Class 2 Wetland and presently
exhibits a low function and value rating. The proposed restored wetland area will be
within with the northern portion of Wetland A will provide full compensation for
unavoidable project impacts while also enhancing the function and value of the wetland.
Upon the completion of this mitigation plan there will be no net loss of King
County regulated wetland functions or values, an increase in the potential for the
buffer to protect aquatic habitats, and an increase in the potential to provide long-
term protection of wetland and buffer areas through an enhancement of a
degraded wetland.
To achieve the defined GOAL, the following OBJECTIVES are defined:
• Plant Community Structure
A. The enhanced compensatory mitigation wetland area will total 4,000 square
feet and will exhibit a scrub/shrub and sapling tree vegetation classes within
five years following initial planting (palustrine, scrub/shrub, seasonally flooded
-PSSC).
• Natural Biological Attributes
B. The compensatory mitigation wetland and the associated buffer will include
the placement of snags and downed logs which provide nesting and cover
habitat for passerine birds common to the area within five years.
PERFORMANCE CRITERIA
Evendell -18
Wetland/Wildlffe Report -00062
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 29
To establish whether the defined project OBJECTIVES have been met by the wetland
mitigation plan. the following PERFORMANCE CRITERIA have been established to
apply to the compensatory mitigation wetland area.
Objective A. The compensatory mitigation wetland· area will total 4,000 square
feet in size and will exhibit scrub/shrub and sapling vegetation classes within five years
following initial planting (palustrine, scrub/shrub, seasonally flooded -PSSC).
Performance Criteria: As defined by Canopy Coverage Method sampling (0.25
m2 plot frame) the emergent plant community within the 4,000 square feet of
the compensatory mitigation wetland area will exhibit at least an 80%
coverage within five years following initial planting. As defined by Line-
intercept Method sampling the scrub/shrub and sapling vegetation class will
exhibit at least a 50% aerial coverage within five years following initial
planting in those areas not identified as open water. ·
Performance Criteria: At the end of the first growing season 100% of the
installed trees and shrubs will be alive and exhibit growth. Those species
identified as dead will be replaced prior to the start of the second growing
season.
Performance Criteria: At the end of the fifth growing season 80% of the trees
and shrubs (species combined) will be alive and exhibit growth.
Objective B. The compensatory mitigation wetland and the associated buffer will
include the placement of snags and downed logs which provide nesting and cover
habitat for passerine birds common to the area within five years.
Performance Criteria: A minimum of three (3) stumps (minimum 10 feet in
length, minimum 20 inch diameter at the top, minimum 1 O foot diameter at
bottom of rootball) and a minimum of three (3) downed logs (minimum 20 feet
in length, minimum 20 inch diameter at 10 feet above root collar, minimum 10
foot diameter at bottom of rootball) will be placed within the compensatory
mitigation area to provide habitat for passerine birds common to the area.
(Appendix B).
Performance Criteria: The compensatory mitigation area will be used for cover
by at least two species of passerine birds common to the area within five
years of completion of construction of the mitigation area.· This will be
monitored through observations and photographs of individual birds and
habitat utilization.
MITIGATION REPLACEMENT/ENHANCEMENT
Evendell -19
WetlandNVndlife Report -00062
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 30
The selected mitigation area will make an improvement to the functions and values
offered by the existing onsite wetland and buffer while also providing a wider range of
functions and values not presently exhibited onsite.
Primary features offered by the selected mitigation plan includes a higher functioning
wetland area, greater water quality protection to downstream resources, greater
opportunity for biofiltration of surface water, greater water storage capacity, greater
diversity of plant species and plant community associations, greater diversity of wildlife
habitats.
Overall, the proposed mitigation plan will provide a higher quality and a wider
range of functions and values per unit area that presently exiting onsite within
Wetland A. The proposed mitigation plan offers the opportunity to replace existing low
function wetland with an area of greater functions and values. In addition, provisions
will be put into place that will allow for the long-term protection and preservation of the
entire wetland mitigation area, together with monitoring to ensure that the plant
communities and wetland hydrology features are established.
SUMMARY TABLE OF WETLAND FUNCTIONAL BENEFITS
MITIGATION ELEMENT WETLAND FUNCTION BENEFITS
Establishment of a diverse plant community • Natural Biological Function
and habitat features within the wetland and • Water Quality
buffer areas.
Enhancement of the mitigation wetland area • Hydrologic Support
through selective site excavation. • Stormwater & Floodwater Storage
• Water Quality
• Natural Biological Function
• Groundwater Rectiarqe
Removal and management of invasive • Water Quality
soecles. • Natural Biolo11ical Function
Use of temporary and long-term erosion • Water Quality
control technolonv.
SELECTED PLANT COMMUNITIES
The plant communities and plants selected for the created wetland and restored/
enhanced wetland and buffer areas will be obtained as nursery stock. These selected
species are native and commonly occur in the local area. The plant species are
selected to increase plant diversity, match present onsite communities, increase wildlife
habitats, and enhance the aquatic environment.
NUMBER COMMON NAME LOCATION
SCIENTIFIC NAME
20 Western red cedar (THP) Wetland and
Thuia n//cata buffer
PROPOSED PROPOSED INDICATOR
SPACING locl SIZE STATUS
12-15fl 5 ft height FAC
minimum
Evendell -20
Wetland/WIidiife Report -00062
05/10/2004 15:08 2535390514 :SOUNDBUILT HOMES PAGE 31
20 Sitka spruce (PIS) Wetland and 12-15/t 5 ft height FAC
Picea sitchensis buffer minimum
10 Oregon ash (FRL) Wetland 10-15/t 4 ft height FACW
Fraxinus /atifolia minimum
20 Black Winberry (LOI) Wetland and 4 ft 2 gal FAC""
Lonicera invo/ucrata buffer
20 Pacific ninebark {PHC) Wetland 4 ft 2 gal FACW-
Ph=ocamus caoitatus
20 Red-osier dogwood {COS) Wetland 4 ft 2gal FACW
Comus stolonifera
20 Salmonberry (RUS) Wetland 4 ft 2gal FAC+
Rubus soectabi/is
20 Sitka willow (SAS) Wetland 10-15/t 2 gal FACW
Sa/ix sitchensis
SEEDING MIXTURES
Wetland Area Soil Moisture Conditions
Common name Scientific name cercent b" welaht
Redtoo Aarostis alba 50%
Water foxtail Alooecurus oenicu/atus 50%
apply at the rate of 120 pounds per acre
Upland Buffer Area Soil Moisture Conditions
Common name Scientific name nercent bv weiaht
Colonial bentQrass Aorostis tenuis 15%
Tall fescue Festuca arundinacea 40%
Perennial rvearass Lolium perenne 30%
Creeoina red fescue Feistuca rubra 15%
apply at the rate of 120 pounds per acre
CONSTRUCTION INSPECTION
Essential to the success of the compensatory mitigation plan is the accurate inspection
of onsite activities immediately prior to and during the construction phase. These
activities include pre-construction site inspection, onsite inspection and technical
direction during construction and planting activities, and post-construction site
inspection and evaluation.
The pre-construction site inspection allows the project proponent and the project
biologist to evaluate and, if necessary, adjust the onsite construction steps. These
steps include analysis of project site elevation features, project sequencing and timing,
final grade analysis, unforeseen required minor modifications to the original
establishment plan, and the establishment of environmental protections (silt fences,
etc.) required during construction. Interaction with King County wetland staff is also an
Evendell • 21
Weiland/Wildlife Report -00062
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 32
essential element during pre-construction site inspections and discussions. Onsite
technical inspection during construction and planting activities will be implemented by
the combined efforts of the project biologist and King County wetland staff. The project
biologist will perform construction oversight and address minor unforeseen construction
difficulties to assure that the intent of the buffer establishment plan is met
The project biologist shall also be responsible for assuring that the species and sizes of
native plants selected and noted within the final planting plan are utilized during
construction. The project biologist shall also be responsible for the placement of all
trees and shrubs. If selected native species become unavailable, the project biologist
will consult with King County wetland staff for substitute plant _species to assure that the
intent of the stream buffer establishment plan is met. Post-construction site inspection/
evaluation will include the preparation of a "record-drawings" which will be submitted to
King County wetland staff.
WATER QUALITY PROTECTIONS DURING CONSTRUCTION
The project team will implement a wide range of water quality protective measures
during and immediately following the construction of the compensatory mitigation area.
This protective measures include the placement of appropriate silt fencing along the
outer boundary of the buffer area to be established, short-term silt fencing adjacent to
the specifically identified wetland and buffer excavation areas, work during the drier
season of the year, the use of well maintained machinery, the seeding/mulching of all
exposed soil surfaces within two weeks from the final completion of site excavation, and
the irrigation of the wetland and buffer areas to ensure plant community establishment.
In addition, best management practices as identified within the erosion control plan
prepared for this project site will be used during the entire construction phase to protect
water quality.
CONSTRUCTION SEQUENCE
TASK APPROXIMATE DATE
OF COMPLETION
Initial onsite team meeting to define final construction steps September 30, 2001
and oroiect team tasks.
Onsite marking of wetland creation area and outer buffer October 15, 2001
boundaries. Placement of protective silt fencing and other
erosion orotections as needed.
Plantina of wetland and buffer areas.
Final construction reoort
PROJECT MONITORING
November 15, 2001
November 30, 2001
Evendell-22
Wetland/Wildlife Report -00062
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 33
Following the successful completion _of the proposed compensatory mitigation plan a
five-year monitoring and evaluation program will be undertaken. The purpose of this
program is to assure the success of the selected mitigation as measured by an
established set of performance criteria (see above). This monitoring will also provide
valuable information on the effectiveness of mitigation procedures.
STANDARDS OF SUCCESS
Vegetation Sampling Methodology and Monitoring Schedule
Permanent vegetation sampling plots will be located within each planting community in
areas representative of the communities being sampled. These sampling plots will be
located along specific transects and at stationary identified points. Observations and
measurements will be recorded for all plant species in order of dominance based on the
relative percent cover for each species within the various vegetation strata. Sampling
for tree and shrub species will be completed in 30-foot radius sampling plots. Stratified
methods will be used to increase the precision of sampling data while also maintaining
elements necessary for statistical inferences.
,,
The evaluation of the success of the enhancement program will be based on the
expected cover percentages to be defined within the final compensatory mitigation plan
and the selected 80% survival rate at the end of the fifth growing season following initial
planting. The percent of aerial cover and the percent survival rate will be based on
combined counts of existing and planted species during vegetation monitoring. Sample
location will be shown on the design and the "record drawings" plans, and will
correspond to identified photo points. Trees and shrubs will be visually evaluated to
determine the rate of survivorship, health, and vigor of each plant. The categories to be
used will include live, stressed, tip dieback, basal sprouts. not found, apparently dead,
and dead.
Vegetation ll/lonitoring
1. Upon the completion. of initial planting and as a part of each monitoring period the
project biologist will count the number of plants which were planted within the
wetland and buffer areas. -Plants will be identified to species and observations of
general plant condition (i.e., plant health, amount of new growth) are to be recorded
for each plant.
2. At identified sample plots within the created wetland and the enhanced buffer areas
the project biologist will. determine percent coverage of vegetation using the Canopy
Coverage Method sampling (0.25 m2 plot frame) procedure for emergent species
and by using the Line-intercept Method sampling procedure for the scrub/shrub and
sapling tree species.
3. Within the entire mitigation area the project biologist will count the number of
undesirable invasive plants and estimate the aerial coverage (as if the observer
Evendell-23
Wetland/Wildlife Report -00062
'
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 34
were looking straight down from above) of these invasive plants. Undesirable plants
include blackberries, Scot's broom, tansy ragwort, reed canarygrass, and other such
plants listed in the Washington State Noxious Weed List
4. Within the entire mitigation area the project biologist will count the number of
desirable "volunteer'' plants and estimate the aerial coverage of these plants.
5. The project biologist will take photographs that show the entire mitigation area.
During the five-year monitoring period photos will be taken in the same direction and
at the same location to provide a series of photos. These photos will show plant
growth, plant species, and plant coverage.
6. Upon the completion of the initial project planting and upon the completion of each
monitoring period the project biologist will prepare a report defining methods,
observations, and results along with the date the observations were completed.
Each report will be sent to King County wetlands staff.
7. The monitoring schedule is defined as:
A. At the completion of initial project planting. This report will include a ·record
drawing" defining the species used, locations, and general site conditions. This
report will also include a "lessons learned" section to assist in future monitoring and
final project assessment. This "record drawing' and report will be provided to the
County within two weeks after the completion of onsite planting.
B. Twice a year for years one through three following the completion of initial
onsite planting. For each monitoring year, onsite monitoring will be completed
once early in the growing season (late March to mid-April) and once again near the
end of the growing season (mid-September). For each onsite monitoring activity a
report will be prepared and provided to the County within two weeks after the
completion of onsite monitoring.
C. Once a year for years four and five following the completion of initial onsite
planting. For each monitoring year, onsite monitoring will be completed once near
the end of the growing season (mid-September). A report will be prepared and
provided to the County within two weeks after the completion of onsite monitoring.
MONITORING
YEAR
YEAR-1
YEAR-2
YEAR-3
Vegetation Monitoring Sequencing
VEGETATION MONITORING
On or about Aoril 15, 2002
on or about Sept. 15, 2002
On or about Acri! 15, 2003
on or about Sept. 15 2003
On or about Acri! 15. 2004
SUBMITTAL OF MONITORING
REPORT
Report due Mav 25, 2002
Reoort due Oct. 15. 2002
Report due Mav 25, 2003
Reoort due Oct. 15, 2003
Reoort due Mav 15 2004
Evendell • 24
Wetland/Wildlife Report· 00062
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 35
on or about Sept. 15. 2004 Reoort due Oct. 15. 2004
YEAR-4 on or about Sept. 15, 2005 Report due Oct. 15, 2005
YEAR-5 on or about Seo!. 15, 2006 Reoort due Oct. 15, 2006
The last monitoring report dated October 15, 2006 will include notification to the County
biologist that the monitoring program has concluded and that County review and site
inspection is required for project analysis and release of the financial guarantee. This
final report will also include a . "lessons learned" section to assist and final project
assessment and to potentially assist in the evaluation other mitigation projects.
WILDLIFE OBSERVATIONS
Observations of wildlife will coincide with the onsite activities undertaken as part of the
Vegetation Monitoring Program. The onsite team will document the extent of bird
species abundance, site utilization, nesting and feeding activities, and species diversity.
In addition, documentation of terrestrial and aquatic reptiles, amphibians, and mammals
observable without trapping will also be documented. Wildlife observations will be
documented within the Vegetation Monitoring Reports noted above.
VEGETATION MAINTENANCE PLAN
Maintenance of the enhanced wetland and buffer plant communities may be required to
assure the long-term health and welfare of the wetland's and buffer's environmental
functions. Such maintenance would be identified during the monitoring period and
undertaken only following discussion and coordination with King County wetland staff.
The overall objective is to establish undisturbed plant communities that do not require
maintenance. ·
Activities may include, but are not limited to, the removal of invasive non-native
vegetation and the irrigation of selected areas. Established maintenance activities
include the removal of any trash within the wetland and buffer. Temporary irrigation will
be established (if necessary) to ensure one-inch of water from June through September
of the first year following installation of the plantings. The need for temporary irrigation
of these areas during subsequent years will be defined during the spring monitoring
period.
REMOVAL OF INVASIVE NON-NATIVE VEGETATION
As a contingency, should the removal of invasive non-native vegetation become
necessary, the project proponent will contact King County wetland staff to establish and
define specific actions to be taken. Resultant contingency plan activities will be
implemented when the ongoing vegetation monitoring program indicates that plants
listed in the Washington State Noxious Weed List, blackberries, Scot's broom, tansy
ragwort, or reed canarygrass are becoming dominant in the community.
Evendell-25
Welland/Wildlife Report -00062
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 36
CONTINGENCY PLAN
As a contingency, should the proposed compensatory plan fail to meet the performance
criteria, the project proponent will undertake required remedial actions. Where plant
survival is the failing component, the project proponent will replant and assure the
success of this second planting which would be held to the same standard of success
as measured by threshold criteria and monitoring processes. Should additional
remedial actions be required, the project proponent will meet with King County wetland
staff to establish and define actions to be taken to meet the desired goal of this
program.
PLANTING NOTES
All plant materials shall be native to the Puget Sound Region. The onsite biologist shall
inspect plant materials to assure the appropriate plant schedule and plant
characteristics are met. The project proponent shall warrant that all plants will remain
alive and healthy for a period of one-year following completion of planting activities.
The project proponent shall replace all dead and unhealthy plants with plants of the
same specifications.
FINANCIAL GUARANTEE
Financial guarantee will be provided for this project to ensure project completion and
performance: This guarantee is defined using the standard King County Bond Quantity
Worksheet (Appendix B).
Evendell-26
WetlandNVildlife Report -00062
05/10/2004 15:08 2535390514
C=flAIBBTA 1r
YECll=llN@ll.,@~8~$
SOUNDBUILT HOMES
I
t.s I
"1
i
I
I I ST::;.!' ' l I vi/
SE/ 131ST / ST <Cl ~ ::1,1 . /' J 13lST i.., / <C ;,,.• I : PL Ul•
...:/ SE 132ND,_;E 132ND ~ f ni SE
l PL /a ~ ; ;C
' C\J ;l;; c::
II J C-, I-" "
.... <c ~::
~, ~ SE 134TH ;e ST :c,
,.... I ::/ /~
~! ST/ ,'~ .... , l i .
~6DOO / ::,:!
/;51
~~L ; ,....1SE
LIBERTY ~
I
HS I
i
I
Lu
V')'
figuire 'ii
Sfite Vecn1n16ey
PAGE 38
05/10/2004 15:08 2535390514
,; .
··.~ ..
'I
~SC.---*lli'
i,
.............. -1
'?-·-....
-· ......... ' \
IHIA~DTA¥
Tf!CHINIOlla@GHli:$
', '
SOUNDBUILT HOMES PAGE 39
\
' .,,., • . .;,,..,~
. I;!..
,I, • ' • ..,,. __ ...... .. t -, ·~ -';,---
\ ·~ . '·
__ ..._~.--
.-
.. ~twe
------.. \,,,<-.••. ' --~ t ·? ,,. j
IRgure 2
NWD ReSOl/!!i'C<e Mappili'llg
05/10/2004 15:08 2535390514
I
I
!
I
I
I
I
I
I
I
f ---·
ll=BA~DT.A'iF
TEeHN@lbOGIES
I
I
SOUNDBUILT HOMES PAGE 40
Fig11.B6"e 3
PHS Resource Mappiing
• 05/10/2004 15:08 2535391:1514
..
..... It ..
• • • ~. o,
tHI.AB BT AT
TECHNOLOGHES
•
..
..
...
IS Iii', 111"-Q., ....
• • ..
SOUNDBUILT HOMES
..
• ----
D'" 0 •
a _DI D"
-.;i:, ..
•
"
•
. .. ·Q ••
:~ ·:. ~..,_:ir--:-'·\' ··;.:.;: .• .
_.,..
:'.'.~-; _:-.:'
---
,: ; .. ,
'•';-
... a• ID 111 oaR .. •·
•
.. • • • tt; .. • a •• •
• • • . .. . ··o:·
]:"a• ~f .· : aa·ao\~
• • a •.
• • 0 0 D
Fngl!.llli'e 4
D
•
Soil Mapping
PAGE 41
B5/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 42
REFERENCE LIST
Adamus, P.R., E.J. Clairain Jr., RD. Smith, and R.E. Young. 1987. Wetland Evaluation
Technique (WET); Volume II: Methodology, Operational Draft Technical Report Y-87,
U.S. Army Engineer Waterways Experiment Station, Vicksburg, Mississippi.
Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of Wetlands
and Deepwater Habitats of the United States. Office of Biological Services, U.S. Fish
and Wildlife Service, U.S. Department of the Interior, FWS/OBS-79/31.
Environmental Laboratory. 1987. "Corps of Engineers Wetlands Delineation Manual,"
Technical Report Y-87-1, US army Engineer Waterways Experiment Station, Vicksburg,
Miss.
Hitchcock, C.L., A. Cronquist. 1977. Flora of the Pacific Northwest. University of
Washington Press. Seattle, Washington.
Horner, R.R. and K.J. Raedeke. 1989. Guide for Wetland Mitigation Project Monitoring.
Washington State Department of Transportation. contract number GC8286, task 6.
King County Department of Natural Resources. 1993. DRAFT Wildlife Management in
King County: Issue Paper.
Mikol, S.A. 1980. Field Guidelines for Using Transects to Sample Nongame Bird
Populations. U.S. Fish and Wildlife Service publication FWS/OBS -80/58.
Reppert, R.T., W. Sigleo, E. Stakhiv, L. Messman, and C. Meyers. 1979. Wetland
Values -Concepts and Methods for Wetland Evaluation. Research Report 79-R1, U.S.
Army Corps of Engineers, Institute for Water Resources, Fort Belvoir, Virginia.
U.S. Department of Agriculture, Soils Conservation Service. Soils Survey of King
County Area Washington, Nov. 1973.
Washington State Department of Ecology. 1997. Washington State Wetlands
Identification and Delineation Manual. Publication Number 96-94.
Washington State Department of Fisheries, Catalog of Washington Streams and
Salmon Utilization, Volume 1., 1975
Evendell -28
Welland/WIidiife Report -00062
05/10/2004 15:08 2535390514
.. ,_. ..
SOUNDBUILT HOMES
APPENDIX A
FIELD DATA FORMS
Evendell-29
Wetland/Wildlife Report -00062
PAGE 43
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 44
SAMPLEPLOT_S~P~1:...-~~~~~-
DATAFORM
Projed/Site
Applicant/Owner:
Investigator:
ROUTINE WETLAND DETERMINATION
(1987 COE WETLANDS DELINEATION MANUAL)
....;;;E.;,;ve::.:n.:.;:d::::e::.11 ____________________ Date:
...;;;M~~~M~i~ke:.;.:R~om~a~no~------------------County.
...!.!H:::ab::!it:!!:a~t .:,T,:::ec::::h::.:n:::o:::I :ii:i:::es::._ _________ -=------State:
Have vegetation, soils, or hydrology been disturbed?
Is the area a potential Problem area?
YES
YES
Community ID:
Transect 10: .
Plot 10: (If needed. explain on reverse)
17 July 2000
Pierce
Washington
SP1
VEGETATION (Note those species observed to have morphological adaptations to watlands with an•)
no 1--~ Plan• "--c1-S•""u"' ln'""n•or I 0o""'"a"' p1 .. nt Soe...i .. ., Stratum 10 r1;,...,0 r
1.
2. Acer macronhvilum Tree FACU
3. Sao. Corvlus comuta Shrub FACU
4. Rubus snectabllls Shrub FAC+
5. Rubus nrocera Shrub FACU
8. Rubus lacinatus Shrub FACU-
7. P1eridlum anuilium Herb FACU
8.
I Percent of Dominant species that are OBL, FACW, or 0%
C (except FAC-). Include species noted (") as showing
.Jrphological adaptations to wetlands --------------------------1 I Describe Morphological Adaptations:
Remarks: Near nraded roadbed
HYDROLOGY
Recorded Data (Desatbe in Remarks):
-stream, Lake, orTide Gage
__ Aerial Photograph
__ Other
_!_ No Recorded Data Avallable
FIELD OBSERVATIONS:
Depth of Surface Water: O'
Depth to Fn:e Water Pit: O •
' Depth to Saturated Sot1: o•
Remarks:
Deciduous forest
Wetland Hydrology Indicators:
-Inundated
--Saturated in upper 12"
-Water Marks
Drift Lines
Sediment Deposits
Drainage Patterns in Wetlands
-2L_ Oxidized Root Channels in Upper 12 •
Water-stained Leaves
-Local Soll Survey Data
-Other {Explain In Remarlcs)
'• 05/10/2004 15:08 2535390514
iap Unit Name: Alderwood gravelly sandy
, a)(Onomy (Subgroup):Oystrie Entlc Ourochrepts
Profile Description:
Depth
(inches) Horizon
Matrix Color
(Munsell Moist)
0-18 10 YR 313
Hydric Soll Indicators:
Hlstosol ---Histic Epipedon
---Sulfldic Odor
___ Probable Aquic Moisture Regime
___ Reducing Conditions
___ Gleyed or Low Chroma Colors
Remarlcs:
41d indicators of hydric soil NOT pntsent
WETLAND DETERMINATION
Hydrophytlc Vegetation Present?
Hydric Soils Present?
Wetland Hydrology Present?
Remarks:
WETLAND CRITERIA NOT MET
YES' YES
YES
SOUNDBUILT HOMES PAGE 45
SAMPLE PLOT _S_P __ 1 _____ _
Drainage Class: ·
Field Observations
Confirm Mapped Type Yes No
Mottle Colors
(Munsell Moist)
Mottte Texture, Concretions
None
AbUndance/Contrast Rhizospheres, etc.
None Gravelly loam
Concretions ------High Organic Content in Surface Layer
___ Organic Streaking
___ Listed on Local Hydric Solis List
___ Listed on National Hydric Solis Ust
___ Other (Explain in Remarks}
Is this Sampling Poin~ within a ~
WeUand? c::.,,;
Area appears to drain well following seasonal stonn events
•• 05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 45
SAMPLE PLOT SP 2 ---------
DAT AF ORM
ROUTINE WEllAND DETERIVIINA TION .
(1987 COE WETLANDS DELINEATION MAI\IUAL)
Project/Site
Applicant/Owner:
...;:;Ev;.;.e:;;n;,;:d.;:;e;;.11..,. _________________ Date: 17 July 2000
~M.r .... M..:l;;;ke=R;.;..;;om=an;;,;o_,.. ______________ County: ..,Pa.,;i,;.erce~----
Investigator: ...;.;H;:;ab:;.;il;;;at;;...;.Te;;.;Ch=n.;:;ol"'OQl .. ·;;;es;_ _____________ State: Washington
Have vegetation, soils, or hydrology been disturbed?
Is the area a potential Problem area?
(If needed. explain on reverse)
YES M
YES '(!!!! Community 10:
Transect ID:
Plot ID: SP2
VEGETATION (Note those species observed to have morphological adaptations to wetlands with an •1
Dn nfnant Pia"' "'-cles s or I D0 ... 1n""' Pia"' <>-~ies Stratum fndfcator
1.
2. Sao. Pooulus trichocama Shrub FAC
3. Carex obnunta Hert, OBL
4. Juncus effusus Herb FACW
5.
6.
7.
8.
t Percent of Dominant spacies that are OBL, FACW, or 100%
C (except FAC.). Include species noted (") as showing
Jrphological adaptations to wetlands
I Describe Morphological Adaptations: --------------------------;
Remarks: . swale deoression on edve of homesite area
HYDROLOGY
Recorded Data (Describe in Remarks):
-Stream, Lake, orTide Gage
Aerial Photograph --Other ..,..,.._
X No Recorded Data Available
FIELD OBSERVATIONS:
Depth of Surface Water. o·
Depth to Free Water Pit: o •
. -Depth to Saturated Soll: _o_·_
Remarks:
Depr,assionional swala on i!f of cleared lnomesite
. Nelll to slash pile and root
~and Hydrology Indicators:
Inundated
-Saturnted lri upper 12"
Y-Water Marks
-X-Drift Lines
--Sediment Deposits
~ Drainage Pattems in Wetlands
--Oxidized Root Channels in UJJPBr 12 •
-Y-water-Stained Leaves = Local Soil survey Data
Other (Explain In Remerks)
05/10/2004 15:08 2535390514
lap Unit Name: Alderwood gravelly sandy
raxonomy (Subgroup):Oystnc Entic Ourochrepts
Profile Description:
Depth
(inches) Horizon
Matrix Color
(Munsell Moist)
0-6 10 YR2/1
~18 10 YR 4/1
Hydrlc Soil Indicators:
Histosol ------Hlstic Eplpeclon
Sulfldlc Odor ---_x__ Probable Aquic Moisture Regime
Reducing Conditions ...,.,. __
X Gleyed or Low Chroma Colors ---
Remarks:
. ,eld indicators of hydric soil presem
WETLAND DETERMINATION
Hydrophytic Vegetation Present?
Hydric Soils Present?
Wetland Hydrology Present?
Remarks:
WETLAND CRITERIA MET
NO
NO
NO
SOUNDBUILT HOMES PAGE 47
SAMPLE PLOT SP 2 ---------D ra In age Class:
Field Observations
Confirm Mapped Type Yes No
Mottle Colors
(Munsell Moist)
Mottle Texture, Concretions
Abundance/Contrast Rhizospheres, etc.
None None Gravelly loam
10YR3/2 PromJcommon Clay loam
X Concretions -------High Organic Content in Surface Layer
___ Organic streaking
---Listed on Local Hydric Soils Lisi
---Listed on National Hydric Soils Ust
Other (l:xplain in Remarks) ---
Is this Sampling Point within a ~
Wetland? ~
Area appears to drain poorly following seasonal storm events
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 48
·-·· SAMPLE PLOT SP 3 ---------
DATA FORM
ROUTINE WEll.AND DETERMINATION
(1987 COE WETLAIIIDS DELINEATION MAI\IUAL)
Projed/Site
Applicant/Owner:
EvendeD Date: ...;;,,-;,a,,.;.;..,,..----------------17 July 2000
Pierce
Investigator:
.. M""""r. ,..;;M.i_k ee,R:-=om ... a n_o-e-______________ County:
-"H"'ab_itc:a:.:.t.;..T.;;.eeh __ n_ol .. og.,.l"'e-s ______________ State: Washington
Have vegetation, soils, or hydrology been disturbed?
Is the area a potential Problem area?
(If needed, explain on reverse)
YES 'NO
YES NO
Community ID:
Transect ID:
Plot ID: SP3
VEGETATION (Note those species observed to have morphologlcal adaptations to wetlands with an •1
Oomjn,on+ Dh•nt $NO"l"S SI""""" I I Dom•"&"' Dlant ~="'es Stn»um lnd1-or
1.
2. Sa1>. Alnus rubra Shrub FAC
3. Carex obnuma Herb OBL
4. Phalaris arundinacea Herb FACW
5. Salix Sltehensls Scrub FACW
6.
7.
8.
j Percent of Dominant species that are OBL, FACW, or 100%
C (except FAC-). Include species noted (") as showing
,rphological adaptations to wetlands --------------------------;
I Describe Morphological Adaptations:
Remarlc:s: swale depression on Beige of llomesite area
HYDROLOGY
Recorded Data (Describe in Remarks):
---Stream, Lake, or ride Gage
--Aerial Photograph
Other ---_!._ No Recorded Data Available
FIELD OBSERVATIONS:
Depth of Surface Water: o·
Depth to Free Water Pit: O "
_ Depth to Saturated Soil: O" ---
Remarfls:
Depl9Ssionional swale on edge of cleared llomeslte
~and Hydrology Indicators:
Inundated
Saturated in upper 12"
X Water Marks
--;c-Drift Unes
-Sediment Deposits
--X-D,ainage Patterns In Wetlands
-O>cidlzed Root Channels In Upper 12 •
Jt Water.stained Leaves
Local Sotl Survey Data
-Other (Explain ln Remerb).
> 05/10/2004 15:08 2535390514
ap Unit Name: Alderwood gravelly sandy
, axonomy (Subgroup):Oystrlc Entic Ourochrepts
Proflle Description:
Depth
Qnches) Horizon
D-6
6-18
Hydric Son Indicators:
Hislosol ------Histlc Epipedon
Sulfidlc Odor ---
Malrtx Color
(Munsell Moist)
10 YR 212
10 YR 3/4
---Probable Aquic Moisture Regime
---Reducing Conditions
---Gleyed or Low Chroma Colors
Aqmarks:
r ,eld Indicators or hydric soil not present
WETLAND DETERMINATION
Hydrophytic Vegetation Present? ~~
Hydrlc Soils Present? ~.,.
weuand Hydrology Present? YES
Remarks:
WETLAND CRITERIA NOT llllET
Sample plot on edge of defined wetland
SOUNDBUILT HOMES PAGE 49
SAMPLE PLOT SP 3
Drainage C~la_ss_: -------
Field Observations
Confinn Mapped Type Yes No
Mottle Colora
(Munsell Moist)
MotUe Texture, Concretions
None
None
Abundance/Contrast Rhlzospheres, etc.
None Gravelly loam
none gravelly .loam
Concretions
---High Organic Content In Surface Layer
___ Organic Streaking
___ Listed on Local Hydric Soils list
Listed on National Hydric Solis list ------other (Explain In Remarb)
Is this Sampling Point within a @
Wetland?
Area appears to drain well following seasonal stann events
•
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 50
--SAMPLE PLOT SP 4 -------------
Projed/Site
ApplicanUOwner:
Investigator:
DATA FORM
ROUTINE WETLAND DETERMINATION
(1987 COE WETLANDS DELINEATION MANUAL)
Evendell Date: ~,.-;,~'-:,-----------------.....,M"'~"'llni"''-k e,,,,_;..;R .. o m;.;..;;;a ;..no...,... _____________ ~ County:
___ H_abi;;:';;:tat::..;.T .. ech=n .. o;;;logai;,;;es;;;,_ _____________ state:
Have vegetation, soils, or hydrology been disturbed?
Is the area a potentlal Problem area?
YES NO
YES NO
Community ID:
Transed ID:
(If needed, explain on reverse) Plot ID:
17 July 2000
Pierce
Washington
SP4
VEGETATION (Note those species observed to haw morphotoglcal adaptations to wetlands with an •1
On ,1nant Dlant S"""'es ,,,...,.um . f""f,....nr I Do · · Plant "'necies """"'um
1.
2. Sap. Alnus rubra Shrub FAC
3. Carex obnuma Hero OBL
4. Phalaris arundinacea Herb FACW
5.
8.
7.
8.
j Percent Of Dominant species that are OBL, FACW, or 100%
~ (except FAC-). Include species noted (") as showing
,rphologlcal adaptations to wetlands
I Describe Morphological Adaptations:
Remarks: swale depression on edae of homesilll! a111a
HYDROLOGY
Recorded Data (Describe in Remarks):
-Stream, Lake, orTide Gage
Aerial Photograph
--Other
X No Recorded Data Available
FIELD OBSERVATIONS:
Wetland Hydrology Indicators:
-Inundated
Saturated in upper 12·
X Water Merits
-X-Drift Unes
Sediment Deposits
'""icator
,r-Drainage Patterns in Wetlands
-Oxidized Root Channels In Upper 12 '
Depth Of Surface Water: O'
Depth to Free Water Pit: O •
Depth to Saturated Soil: __ o· __
Remartts:
Depressioniom,I swale on edge of cleared llomesite
X Water-Stained Leaves
-Local Soil Survey Data
-Other (Explain In Remar!ts)
•
05/10/2004 15:08 2535390514
lap Unit Name: Aldeiwood graveny sandy
<'axonomy (Subgroup):DySlric Entic Durochrapts
Profile Description:
Depth
(inches) Horizon
Matrix Color
(Munsell Moist)
0-8
6-18
H)'dric SoD Indicators:
___ Histosol
___ Histic Epipedon
___ Sullidic Odor
10 YR 211
10 YR 411
..;.:X__ Probable Aquic Moisture Regime
___ Reducing Conditions
,JC Gleyed or Low Chroma Colors
Remarks:
• .eld indicators of hydric soil present
WETLAND DETERMINATION
H)'droph)ltlc Vegetation Present?
H)'dric Soils Present?
Wetland Hydrology Present?
Remarlts:
WETLANID CRITERIA MET
NO
NO
NO
SOUNDBUILT HOMES PAGE 51
SAMPLE PLOT SP 4 ,.,------.:....._ ....... __
Drainage Class:
Fleld Observations
Conflnn Mapped Type Yes No
Mottle Colors
(Munsell Moist)
Mottle Te,iture. Concretions
Abundance/Contrast Rhizospheres, etc.
None None Gravelly loam
10YR 3/2 Prom./common Clay loam
X Concretions """"-----High Organic Content In Surface Layer
___ Organic Streaking
___ Listed on Local Hydrlc Soils List
___ Listed on National Hydric Soils List
-----Other (Explain in Remarks)
Is this Sampling Point within a ~
Wetland? L/
Area appears to drain poorfy following se4sonal storm events
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 52
·sAMPLE PLOT SPS -=,;..;;. ______ _
Project/Site
Applicant/Owner.
Investigator.
DATA FORM
ROUTINE WETLAND DETERMINATION
(1987 COE WETLANDS DEUNEA 110N MANUAL)
Evendell Date: -===:.-.----------------_M;:;:,:.;r · ,.,M;::l :::ke;;,:R~o:;:m.;.;;:;a n::.:O;.,...--------------County:
Habnat Technol ies State: ~=~=~------=,-.,..---
Have vegetation, soils. or hydrology been disturbed?
Is the area a potential Problem area?
CommunHy ID:
Transect 10:
(If needed, explain on reverse) Plot ID:
17 July 2000
Pierce
Washington
SP6
VEGETATION (Note those species observed to have morphological adaptations to wetlands with an •1
nft njnant C>necles (n .. lMlor I Do-inftM l:llant S-"'0 " -· -· fnd;c..tnr
1.
2. Alnus rubra Tree FAC
3.
4.
5. Rubus "'"C8ra Shrub FACU
8. Rubus laclnatus Shrub FACU·
7. Ptericlium aaumum Herb FACU
8. .
J Petcent of Dominant species that are OBL, FACW, or 25%
\C (except FAC-). Include species noted (") as showing
Jrphological adaptations to wetlands -------------------------1
I Describe Morphological Adaptations:
Remarks: Cleared homesite area
HYDROLOGY
Recorded Data (Describe In Remarks):
-stream, Lake, orTide Gage
__ Aerial Photograph
__ Other
_2L No Recorded Data Available
FIELD OBSERVATIONS:
Depth of Surface Water: o·
Depth to Free Water Pit: 0 •
Depth to Saturated Son: o•
-Remarks:
Deciduous forest
Welland Hydrology Indicators:
-Inundated
Saturated in upper 12'
. __ Water Marks
Drill Lines
Sediment Deposils
Drainage Pattems in Wetlands
Oxidized Root Channels In Upper 12 •
X-Water-Stained Leaves
Local Soll Survey Data -Other (Explain in Remarks)
05/10/2004 15:08 2535390514
ap Unit Name: Afderwood gravelly sandy
i'axonomy (Subgroup):Oystric Entlc Ourochrepts
Profile Description:
Depth
(inches) Horizon
0-8
Matrix Color
(Munsell Moist)
10YR2/2
8-18 10YR2/2
Hydric Soil Indicators:
___ Histosol
___ Histic Epipedon
___ Sullldic Odor
___ Probable Aquic Moisture Regime
---Reducing Condttions
___ Gleyed or Low Chroma Colors
~emarlt!I:
.-meld indicators of hydric soil NOT present
WETLAND DETERMINATION
Hydrophytic Vegetation Present?
Hydric Soils Present?
Wetland Hydrology Present?
Remarks:
WETLAND CRITERIA NOT MET
YES~ YES
YES NO
SOUNDBUILT HOMES PAGE 53
SAMPLE PLOT SP& ~---------Drainage Class:
Field Observations
Confirm Mapped Type Yes No
Mottle Colors
(Munsell Moist)
Mottle Texture. Concretions
Abundance/Contrast Rhizospheres, etc.
None None Gravelly loam
10YR5/8 FainVuncommon loam
Concretions ------High Organic Content In Surface Layer
___ Organic Streaking
---Listed on Local Hyd!ic Soils List
___ Listed on National Hydric Soils List
---Other (Explain In Remarks)
Is this Sampling Point within a ~
Wetland? ~
Area appears to drain well following seasonal storm events
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 54
SAMPLE PLOT SP 8 _;;;;...;; ______ _
DATA FORM
ROUTINE WETLAND DETeRMINA TION
11987 COE WETLANDS DELINEATION MANUAL)
Project/Site
Applicant/Owner: _E;:,,V::..:B:,:nd:;;.e;;;l;.,I -----------------Date: 17 July 2000
.... M~r-,..;,M .. l::.;.ke;;,;..;R.;;;om=an""o'---------------County: . _P_i_erce _____ _
Investigator: ...;H:.:a::b::::il::.at!..T:..:e:::ch:.::no:.:::.::I ::cies=--------------State: Washington
Have vegetation, soils, or hydrology been disturbed?
Is the area a potential Problem area?
(If needed, explain on reverse)
YES
YES
Community 10:
Transed ID:
Plot ID: SP 8
VEGETATION (Note those species observed to have morphological adaptations to wetlands WitfJ an •1
Domin•·• Plan• s•~cies ""'ratu-ncfl~ ... ft, I Oo • p1.n1 "'-cie" s•-·-'·"'cator
1.
2. Sao. Pnnuius trichocarna Shrub FAC
3.
4. Juncus effusus Herb FACW
5. Rubus laciniatus Shrub FACU-
6.
7.
8.
I Percent of Dominant species that are OBL., FACW, or 66%
c (except FAC.). Include species noted (*) as showing
,rphological adaptations to wetlands --------------------------1
I Describe Morphological Adaptations:
Remarks: Sl"'ht deoression on edae of homeslte area
HYDROLOGY
Recorded Data (Desaibe in Remarlls):
-Stream, Lake, orTide Gage
__ Aerial Photograph
__ Other
. X No Recorded Data Available
FIELD OBSERVATIONS:
Depth of Surface Water: o·
Depth to Free Water Pit O •
Depth to satumted Soil: o•
, -Remarks:
Slight depression on edge of cleared homeslle
Next to slaSh pile and root ball
weuand Hydrology Indicators:
-Inundated
Saturated in upper 12"
X-Water Maru
Drift Unes
Sediment Deposits
Drainage Patterns in Wetlands
OJdd~ed Root Channels in Upper 12 •
X-Water-Stained Leaves
Local Soll Sun,ey Data
Other (Ellplaln in Remaru)
05/10/2004 15:08 2535390514
9P Unit Name: Aldenvood gravelly sandy
• axonomy (Subgroup):Oystric Entic Durochrepts
Profile Description:
Depth
(inches) Horil:on
Matrix Color
(Munsell Moist)
0-4 10YR3/2
8-18
Hydric Soil Indicators:
Histosof
--Hlsllc Epipedon
Sulfidic Odor --
10 YR 413
--Probable Aqulc Moisture Regime
--Reducing Conditions
--Gleyed or Low Chroma Colors
"1&_marks:
.Id indicators of hydric soil NOT present
wen.AND DETERMINATION
Hydrophytic Vegetation Present?
Hydric Soils Present?
Wetland Hydrology Present?
Remarks:
WETLAND CRITERIA NOT MET
SOUNDBUILT HOMES PAGE 55
SAMPLE PLOT SP&
Drainage C.:=:l~ass".'."'"": -------
Freid Observations
Confinn Mapped Type Yes No
MotUe Colors
(Munsell Moist)
Mottle Texture, Concretions
Abundance/Contrast Rhizospheres, etc.
None
None
None Gravelly loam
none loam
Concretions ------High Organic Content in Sulfaca Layer
Organic streaking
---Listed on Local Hydric Soils List
Listed on National Hydric Soils List
---other (Explain in Remar11S)
Is this Sampling Point within a ~
Watland? \..J
Area appears to drain well following seasonal stonn events
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 55
SAMPLE PLOT SP12 ---------
Project/Sile
Applicant/Owner:
Investigator.
DAT AF ORM
ROUTINE WETLAND DETERMINATION
(1987 COE WETLANDS DELINEATION MANUAL)
Evendell Date: ~~-==--:------------------· ~M ... r.~M":"i~ke-=--R..,o_m_a~no....,. ______________ County:
_...H ... abit""· .. at ...... T ... ech ...... n ... o_lOQ...._le ... s ______________ state:
Have vegetation, soils, or hydrology been disturbed?
Is the area a potential Problem area?
YES~
YES @Ji) Commun~y ID:
Transect ID:
(If needed, explain on reverse) Plot ID:
17 Juty2000
Pierce
Washington
SP12
VEGETATION (Note those species observed to liava morphological adaptations to wetlands with an ")
D . PJ:>nt Sner.i«~ 1n,tj<,:,tnr . l nnm1nant Plant ~-,,.es Slmtnm lndl.....tnr "' 1.
2. Alnus rubra Tree FAC
3.
4.
5. Rubus nmcera Shrub FACU
6. Rubus lacinatus Shrub FACU-
7. Pteridium aauifium Herb FACU
8.
I Percent or Dominant speC!es that are OBL, FACW, or 25%
c (except FAC-). Include species noted (") as shoWlng
Jrphological adaptations to wetlands --------------------------i
I Describe Morphological Adaptations:
Remarks: Cleared homeslte area
HYDROLOGY
Recorded Data (Describe in Remarks):
-Stream, Lake, or Tide Gage
__ Aerial Photograph
other
2._'""N.,..o""'R""ecorded Data AvaUable
FIELD OBSERVATIONS:
Depth of Surface Water. o·
Depth to Free Water Pit O •
Depth to saturated son: _o __ ·_
Remarb:
Deciduous forest
Wetland Hydrology Indicators:
-Inundated
-Saturated In upper 12"
-Water Mar11s
Drift Lines
-Sediment Deposits
-Drainage Patterns In Wetlands
. -Oxidized Root ChannelS in Upper 12 •
-Water-Stained Leaves
-Local Soll Suniey Dabt
-Other (Explain in Remarks)
05/10/2004 15:08 2535390514
ap Unit Name: Alderwood gravelly sandy
laxonomy {Subgroup):Dystric Entic Durochrepts
Profile Description:
Depth
(inches) Horizon
Matrb( Color
(Munsell Moist)
0-4 10YR 3/2
4-18 10 YR 413
Hydric Soil Indicators:
Hlstosol ------Histic Epipedon
Sulfidic Odor ------Probable A.quic Moisture Regime
---Reducing Conditions
___ Gleyed orlowChroma Colors
Remarks:
, .eld indicators of hydric soil NOT present
WETLAND DETERMINATION
Hydrophytic Vegetation Present?
Hydric Soils Present?
Wetland Hydrology Present?
Remarks:
WETLAND CRITERIA NOT 11/lET
YES~ YES .
YES 111.0
SOUNDBUILT HOMES PAGE 57
... .,.·
SAMPLE PLOT ,,,s ... P_1;;;;2 _____ _
Drainage Class:
Field Observations
Confirm Mapped Type Yes No
Mottle Colors
(Munsell Moist)
Mottle Texture. Concretions
None
None
Abundance/Contrast Rhizospheres, etc.
None Gravelly loam
None loam
Concretions ------High Oiganic Content in Surface Layer
---Organic Streaking
Usted on Local Hydric Solis Ust
---Listed on National H)dric sous List
other (Explaln in Remarils) ---
Is this Sampling Point within a ~
Wettand? ~
Area appears to drain well followlng seasonal stonn events
•
Herbs and Groundcovsrs I
!lc.tentlf1c NUUi! CtllmMn Ma.me Unit Pric1 · Qtv U'nit: P~ici Qtv Unit Prio40tv
4" PClt 1 cra.llon Se«.ds/aa.
Achlllea adlletol!um Yarr<>lf • ll,S2
AD.aohalis urnarltac Pearlv everlaat,11 , s ?.69
A:rctoatanhVJo,, uva-u JUnniltinnick $. l.l? • 33.~8
AnJnCUB dJ gj CUI/ Qoat • s bea:rd s 13 .S4 s 33,28
C.Hba oalustr1Y tie.Zeh fM.!:'J.gold $ 14. l9 s .o, 08
Ulc~tra formosa Bleed.Ina heai,t • 2.27 s ll.22 S 122. 88
R»Jlob1um aagustJlol Vireweed ~ U,44
Praaa.rJi111 ch1lot!J11ij.t Coa.et atra.Wbe~ $ 2,27 • S7,60
a.um macronhvJJum B.ia-leilf' avena s 2.27 ~ 51. 20
Hdracleum laz:tatum cow narsniu s l..45
hvllu10 tenujn, Pacific waterle.tf A J • .l? 4 11,91
liJnns:-.a boNal :ls Tlf!nUower s 2.27 • 143. 46
.LUDJtt\.ld llOl•rnb11JluS Sti:r-leat' lu1:>ine • 6,72
LYs.tah1~C'llJ. •tnar1ca~u Skunk cabbage s 13 .a,
Na1antb.ttmum dil-atatr Wild lily or the •• 2.l7
lfJmulus n'11Ctat:us Yellciv monkev tl § l.27 $ llS.00
INOsot:JJJ lUa S'nlall foruet-me-not 8 2,. ea
O..naatlul sa:rme.ntasa tl&te.t' DUSl!!IV ll 12 .58 s 44.80
OamarbJza ahJl0ttJ1si• !ilfa.et cic:ely .!I 44,·. BO
Qx-a11B Ol:'80'.t»il 9'o-cd.-sot-rel $ 2.27 $ 89.GO
Petasitep lrigiduu Coltafoot • 13.22
l'ol naniaaria i.a.tu 1s thumb
Pot~nt11ls tn.itioosa Bush DOt:.ett.tilla
SD.ilacins stalJata solc1n0n's Star ~ 2.27
Sta.c1rtna ccolevae area.t beitonv S 102,40
r<t!lJma aroncUllor• P'ringecup 4 lEL40
7Jarella trJroJiata foa•1Uower • 143,46
Tol~Jea rnen•JesJl Pi09rtu-baak ola.nt & 2.:t7 $ 102,40
VJol• <Jlaball.a Btreatn \riolat. $ 2.27
W<!b-llolldQ....,tityW-..iRnal,ldll Sansll:lve Arttas Bond Quantity wor/tsheet
•
Qtv 'total
Coat
• -
s -
s -
g -
s -
$ .
• .
s .
$ -
s .
ii -
$ -
s -
A -
$ .
5 .
s .
• -
s .
s -
$ -• .
s -• -
$ .
$ -
$ -
PoG• 4 Augu,t a, 1998
Q
U1 -.... ,_.
Q -....
"' Q
Q
A
,_.
U1
Q
CD
"' U1 w
U1 w
<D
Q
U1 ,_.
A
I
H r -<
!
~
~
"' "'
05/10/2004 15:08 2535390514 SOUNDBUILT HOMES PAGE 58
·-.~·
APPENDIX B
KING COUNTY BOND QUANTITY WORKSHEET
Evendell-30
Wetland/Wildlife Report • 00062
-mu KilJgCcrwuy Oepuimec• afOtrclopn:i~t md l!nri.onmenr.d Su,ice,
VOO 01..uldale AWAl:lc S0uthwts1
Rttttxm. WA taO:SS...1119 D<ltili //2--1/0L
AppendixE: Bond Quantity Worksheet for Sensitive Area Mitigations
l'rojoct Name, e:,,b/V/. I/
~rojaot ~81'1
r.o~atiaa.1
Coutaet lfamo, Address,
l'SJUl'.I' MA'l'BlltAJ.S , I I
J»luc Hl.t•dmJ pr1c1111 Jaolude labor, 1MealJatJt3n, con~ai:::ton' mat'ho and aall!'& tu, but dOll't: include dsli~ry. (1:281 ot •hoJ,t1ule plar
naas
ScientU!c lla111e Coa:oum. Halite Unit Pric twv unit Pric Otv Gnit Pric Qtv CJnit. Pr.le Qty Tota:i.
4'll not l aallon l aallon '5 aallcn ~oat.
Ab!es ,.....&ndi.•• "'""'and fir
Acsr nracro»bYllum big leaf maple $ IJ, 54 ~ .
AJnus rubr• sted alder ' l3 ,2l • .
Ar'butua areai.!esjj Pa.citlc mad:rone s 14, 50 • .
BetuJa. aantn'-J.te:r11 naner bJ.:rc:b s 13 ,23 $ .
""A Pr11.Jt1nus 1.at.it'olia Ore<1on ash s 13 ,22 s 2J.Sl ., -/. ~// //} • "17 ~ .(T)
.?(~ic&a at~che~sis• Sitka Ul'lruce. ! ll .54 $ 24,lS ti 5.oo 1.(7 ~ '100 · Ocl
PJ.JJUB COJ1torta* Sh.ore nine /J 13.54 $ 24 .15 " .
PJnus mont1aola• Heste~n white cine s 13 .S4 • 24. lS s .
Pom.olus t:remuloide• Miattir,,q ut1en $ 24.lS $ .
»'ooulu• trtchocarPllil black cottonwood s ll .54 s 21.Sl s .
PrwtLlB emanT.tn&ta bitter chsrrv $ 13.54 s .
»seudotauga llMn~Jesf llnltnlae fir 8 L3 .SC $ 2j_5i s 44, 74 $ .
7axus brevjfolia• Pacific vsw s .
>f Tbuja ,:,J.f(:',aca• M!tStern. r!!d. ceda s ll .54 s 21. 51 s 44. 74 7.n ii ')(' I i./ • •w
rsuoa haterop.11ylla• weatol:'n hemlock $ lJ .54 ~ :Zl.82 $ 44.14 s .
All Dlaut l)rJt"ss are frot1t. Youreh Corner Nu:rseri~s. Sound Native .Pl.m.t:s, storm Lake OroQi6ira. and Wabash Natives (contat
and Abund'c1Dt LJ~e and Frostv Holl()W (teedsJ. I I I I I I '
WQI). ElofidQuan~tyWorbheet:Ai.t .xbl Sensitive Areas Bond Quantity WOl'lt'Shfft Pagel August 8, 1998
•
CT)
U1
'-....
CS)
'-
N
CS)
CS)
"' ....
U1
<S)
ro
N
U1 w
UJ
CJ
cD
CS)
U1 ....
A
§
g
C
H r::;
a { ffl ·. en
-u
~
UJ
cD
SHRUBS U'nit Price unit Price ttni t Price
Sclent.Hic Name C'ob'lllOn Na.me 4" Dot QtV 1 O"&llon QtV ::i aa11on
Acu clrcinatum v.lne maple • l3.S4 s 23.Sl
IL1!elaaahJ•r ala!foli aervlt:eber-rv s 13 .54 $ 23.92
Berberia a-41/oltum tall Oregon orace • 14.15
BQrberjs ner'll'Claa short ~...,.en ara1 e. s ll. 80
comas st"olo.oi tera red~o1ier dom.ioo, $ 13.22 in s 33.51
('(J1"VJUS COl'llUta haaelnut • 13 .54 • al.s1
l".rataearJa douqla&1i blaok havthom s lJ.32 s .23.Sl
Gau1ther1a ahallaa aal.al $ l. 89 !1. 13.9,
Bolodiscus djecolo~ ocean -ra.v 9 l3 .54 s 2l.5L
lio..aJ.ca.ra lavolUC"ra.ta black twin.berry s ll.54 Z.CI • 32.87
Mvrlce aa.le aweetgale
r-.1ori41lSJr; horrJ.dus Devil's c:il\lb s 1J. a, • 24 .ls
Qhlladal""us le~isli mock or"'""e s ll.54 s 32,87
Plw1111aaQl"ffUS CaDjtattJ Pacific ninebark s 13.:23 .., " $ 2l ,Sl
Pru.qua viia1a1.taa ~oke cher%Y
Pvn,s ~usca we.tern trabu,,.", • 13. l2 & 23.51
Rbumua JJursb.J a.ca CLISCU& $ u.n 4 23.51
~ f>lmtli:IOJJ At.e-"·•lJWI PedUc rhcidcd•ndrllil s u.19
~fbfts braeeeoeum stink: currant ~ 13.22
IUbes lacustre nt"icklv currant s 13 .8!
Rlbes s~1.neu:m r~d-tlowQring crurrant s ll. 86
Rosa ........,""Ca "'"a Nood roae • lJ .34 s 2.4 , 15
Roa.t nutkana Bootka rose $ !l .54 $ 21.51.
Ros.II Di•ooa-a clustered rose • ll,S4 e 22,87
lt1.1lN.r,1 leucoderm1s black rasobe:t>YV
Rubus ...... rv.itlorua tbitllblehen,> .; ll , .S4
Rubus .meatab.llJs salt11onberrv s 13.22 1~ s 23.51
SalJx aevel"'J.4lta GeYer winow • 13 .22 $ 22.B7
saJtx hookeriaoa .l:lookar•s wil.lo'lf .. 12.91 $ 22,87
salJx las1Mcfra Pacitio willow • n.n • 2~. 87
Sa1Ja •coul~rlana S-cauler willow
saljx sttchausls Sitka willow $ 13.22 1_ 0 • 22.87
S1mbucus racearosa red eld:erber-~ • 13.54 • ;13,51
Sorbus s1tcb.8ZJsJa Caacad~ mountain ash
~b.o~lcarntla albu• enowberty I • 13.23 -• 23.51
vaoct.ajt.Jtll ovatum eveP'Plre&tt huckleber.....u ~ 13.8'
vacoJnJum osrvJtolJu nd hUcklebe~ I $ 2.91 $ 15.4'7
w•b-B<>ndQ"""til'IW-Anal.>hi Sensitlva Areas Bond Quantity worhhset
Total
lltY Othe:r ntv e.:iat.
s .
$ .
• -
$ .
$ ll]Q. 7{'
s .
• .
s -
; .
s /ff'7-l/'0
$ -
s .
s .
,:-$ u 10-W
5 .
$ .
$ .
• .
~ .
$ -
$ .
• -• .
$ .
• .
$ .
~ • u70 -z,.
s .
$ .
a -• .
$ ui:-,./Jr,
s .
~ .
s .
$ .
a .
Pagel Augu;t a, 1999
•
co
lJl ..__ ....
co .....
N co co
"' ....
(JI
co
CD
N
(JI w
(JI w u,
co
(JI ....
"'
§
~
H r ....
I
. D
I, ffl
en
;g
fj1
()'1
co
Seelaes and Rushe• I
Scientilic Name oomu:m Mam.ei Unit Pric Qtv ll'nit Pric~otv Onl t Pric
411 nnt saeds/oz. 2 '10llon
C'areJt aomosa Br.1.stlv sedae s 1.32
CSt'ex lent.tcular.ts Sbor& eel'lne $ 1.ll
C'arex l ~ .... ··0 •uai Lvnaby BtMlne • 1.32
Carex ob.rUJi:,ta SlOUnh BddCJ~ s l.l2 s l!L20
Car«x rostrata (utrJ B&ake-d s e:dge $ 1.12
c..ux Bt1Data. Sa.Wb&a>i: seaae • 1.32
BleOCIUlrts actcu1ar1 solkerueb
Bleochar1a »aluat.r1• CMmon Spik:erush $ l.32
-J\uJous a~Wldnatus 'l'a~ered rush s l.32
J\Jn(!Us art1aulatus .Jointed n1111h .
..tlmtnw &f"ct.raiu•lva.r. p.:,,dt Bott. rush $ 1,32
J'u.tiou• a.t1BJ~ol1us Dac'n'Jer leaf :ruab s 1.32
Juncus t'l1nlllMr J s Pointed rush s I.06
St!j r-nrn11 i!IICUtua ltardsts~ bulrush $ l.3J $ 23.04
Salrnua marittmus e<.,..rsh bulrusl s 1.n
&aJ..-nua 111.icroearnua sr.au -ft'UJ ted tiul s 1, 32
Grasses
Scientitic H~e t'Off'JnC.n Nam.e Ohit Pric Otv Unit Pric1 Qtv unit PrJ.01
4" got .8eeda/o.a. 2 aallon
Alooecurus deduaJJs Sho:tt.-awn fo.)(tai
AloDecurwr ae.lllculzu Wati,r foxtail s LOO
8aaltmi&ml1s sYz..1gach1J Au:lertcan alo~ang1 • 1.~o . a J .04
Cal.t1rruun"n&t1e c:anadana1 Bl~e1oillt reedr't'raaa
Cfona lat.ito.J.la l(cod reed
lJeB~hA111tist• aaeBDlto TU.fted bair9~ass s 1·. 06 s 9.60
Bl y,-,w, alauoua Blue wiJ.-....,a • 1., 36
Pescuca JdabCensJe Id.a.ha t•scue: /; 3.52
VsBtuc•'rubra va~. r Sled feScue $ 4.79
Gltmeria boreaJJg (o H'ortb.arn m.annaoraaa • 1.60
OlvcerJa •liu:a Tall mal'maora.., I $ 1,45 ~ l.60
PanJ.cwa oct:.1da1:1tale He:stern 1,1,anicaaTa.sa
l'erns
Sa:leacJ.Ltc Name CCCilllcm flame Unit Pric Otv U'ili t 13:ri C Qty Unit Pric
4n 1'0t l aallon 2 dallon
Atb•~llllll tlllll•f•mJn lady fern ! l3, 86
Sl•chnum saicaat deer fe:rn $ ll ,U
Drtn:JnterJ.s ~Ba abield tern < 13 .:it
Polvstlallwlr l!IWlltum \Nteterh sword tern s 11.aG
Nt•ridlum anu11JaJ1n bracken
wob-BandQU11nll~Fl111l.idt Sensruve Areas Bond Quantity wol'ICrllleet
Otv Otv Total
Ot:her coat
• .
$ .
• .
• .
• .
s .
$ .
s .
s .
s .
s .
s .
$ .
s .
$ .
Qtv Qtv Total .,., ..
$ .
• .
$ -
s .
• .
5 .
• -
s -
A -
$ -
s .
8 .
Qty O<V Total
o::..n
$ -
f .
s .
$ .
s -
f'ago 3 Auaust e, 199&
•
CS)
(JJ .._, ,_,
CS) --"' CS)
CS)
" ,_,
(JJ
CS) m
N
(JJ w
(JJ w
U)
CS)
(JJ ,_,
"
gi
~
~
H r -,
~
Ul
-;],
G) r,
en ..,
INST"'··~~oN COST>i r I.ABOit. !OUil> . ow~.,"
""'o I Ullit Filo Ollit
Co'mllO•t. vegetable, delivered and 1ml' $ 37.88 C'{
D8camnactinn till/ha'l"ll~an, medium, to • 1.97 C'{
l>e~nfflflaCting till/bardhan, mediu~ to s I.S7 er
Pe¥tilize, alow relea,e tablets, loam • l.21 Bach
(tvdroaaadino I • O.Sl SY
t,abor. ueneral (lan~•caoAn<rl s 25.00 "" Labor, .:1eneral tcOl'latruct ion) $ 37.00 H1I
tabor, consultant, su1:1enieil'ln • 55.00 HR.
Labor: Consultant, on•sice ra-deaitm. ~ 95.0D llR
fLAIITS, Petted. 4" diameter. rnadium • 0,68 sacb
Pl.Mn'St ~nteinar, l qallon, ·ntediutn s s 10. 02 Ba.ch
PLIWTS1 Container, 2 gallon, mediums $ 16.47 each h 17 ian
Pl.ANTS, Contatna:r, S aallon, med.iU?n • 29.lB Koch .. -,,, ~~
PLANTS, seed.1.na. by hand s 0.44 SY
PLJIIITS: Slios (tirl.llow. red~csier) s l.l.2 S4cb
ft.ANTS, stak.ea !"1llow) $ 0.9d Bach
li.ental of deooffll'lactina tne.cb1ne..-v &, o"' s 70,65 !lcur
Sand, co4~aa buJ.lder•B, delivered and s 42. 06 CT
8tak.ina ~at&rlal (sat 'O&r tree} • 7, oc Bach
SUrvevinR, line & nrade s 605.H DAY
survevtn~. lot locacloD ~ lines .$ 1,lSJ.60, ACR!
8\.lrvevina, ton-raab1c.tl .S 2 UO.og A=
T(lllllld tnoaoil, i:,bJc: l:lan'OW, 20MI tr.t.etOt't s 1. 02 SY
OTHn COSTS -1'111lOV!JHOU'J.' MONITORINQ ~BR!OD
J'YJ>e O'nit Pr.le O'nit
Inao&c1tion, annual S. 460. 00 BACH
JftttnectiCl'J. final s S75, 00 BACH
HaJntenance, setni-annual
Maintenance, :am'I.Ual I
MonitOl'inn. annual I
W'aterini:a, 1~ or water, 60' agaker hos • 3.U 1-!SF
IrriJ:retion -tem.n.Ornrv ! 1,000.00 Ac:re
lrriqation. bUl:ie~ S 4,500.00 Acre
I
web-110m!Q1r.1n~ty\Vorlca/,oelflnal,•f1 S.nsltlve Area• Bond quantity Worltsheet
jorITI
'total
$ .
ll .
s -
s .
$ .
• -
s .
• -
a -
s ,w~ .z.o
,&ilJ.01 .. rr
$ -
s -
$ .
$ .
s -
! -
$ .
• .
s -
'l'ot&l
~ iUt!O-ct)
• ,;-7fi'.OO
s .
$ -
s .
• .
Page 5 AuQtut 8, 1!198
•
<S)
U1 ...._ ....
<S) ...._
10
<S)
<S)
"' ....
U)
<S)
co
10 rn w
U) w
U)
<S)
U1 ....
"'
~
~
H r
-l
~
f'1
U)
,,
~
a, w
HABITAT STRUCTUJl:!S (J.aolud•a ~eliverv\
ITBMS Uni: t'ost Unit
faaoine.a iw1110~1 I iSc1cb
Loga, (c:eda~), 'ti/ root wad•, 1~•-;.i:4• dia11.1 S 1,000.00 sach
tog• {cad.Ir) li/o root 1t!lds, 1,•-24 11 di4111., $ U0.00 Bach
r.oa •• tl/0 root wa.c:L!!, un-:24,~ 4iaiD., 10' lon $ 2415, 00 lfach
Y.n.ot.9 w/ root Vada~ lf' .. 2.f" dhru., 40' long t' 46<1,lJ(I 3acb
Rocke. . one ~man • 60,00 Ba.ch
Rocks, two-man ' B5,00 B&eh
Root wads • t63.00 liach
RnawninQ' aravel, l:Vre l s ,2.00 (!'{
Ne.ir -l ..... $ 1,,00.00 saoh
Weir -ad1Uatable ~ 4 000.00 Bac:b'
:,, · woodv c!,,bris, laW18 $ 163. 00 Bach 3
Bnaae • a&nchorad S 400. 00 Bach.
· SfiAd8 -on site o( s SO.DO Baell ~
sn.aa.s -i-rt!ld • 900.00 Bach
DOSION CONTJIOL
ITBl!S thl!t Cost Onit
Backfill ana COIJ\Daction-embtmkllient G 4.B9 CY
Crushed sut-facina, J 1/41' rrd.nua $ 7C.30 t"Y
Ditc:h!na s 7.0l C'I
8xcant1on bulk $ 1.30 .CT .. , Fence, silt ·s 1.20 LP .:1 Oc..1
J\lte Mesh $ !. 26 SY
MUlch, hv hand. straw, :il 1' deeo g l,27 SY
Mulch, bv hand. wood chigs, ~· deep $ ~.25 SY
Mulch, bv aiaohJne, straw, l" daen · s 0,3, SY
Pl...,inn, t_..,orarv, CPP, 6" s 9.lO LP
Plnl....,,.,, te-oruv, CPP, e• s 14. 00 LP
Pininu, tefflnoray-U, CPP, 1•~ . s 18. 00 LP
Plaat.ic covarina, Eil'lllll thick, d&JldnaCIC $ 2.00 SY
a1o aao, tnac:hlne olaoed, alooes s H.98 t"Y
Rock CQJJ&tr. Jfn.t~ance l00 1 ~1SJ:rtl $ l,545,68 ltach
Rock Conat~. lntrance S0 1~1S'XL 1 $ 1,l71.l4 !!ach
Sediment 1u:md :riser aeBemblv 9 1,695.U Saoh
Sediment tZ"a"' 51 hiah berm s 15.51 LP'
Sadilrei:i.t t.rap, 5 1 high bUlll w/ap!11wy ind. $ 59.EO "" Sodding, 111 deeo, level ground $ 5,24 SY
ecddi.nq, 111 dasim., sl oned qround s Ei. 48 SY
straw-bales, n1.ac:e and ramove $ <32 .00 'roll
ToDsoil, delivez•d and sgrsad s lS. 73 CT
I
web-Bon0Qu1m1tyWoriahee1Fin1l.ldJ SensJttv., ANlllfl Band Quantity Worksheet
Total
$ .
$ .
s .
s .
$ .
$ .
s .
$ .
s .
S Ul('i -CO
J§'(l.0(7
'l'otal
$ .
$ .
$ .
$ .
$ 6,~o-ro
s .
$ .
$ .
4 .
s .
$ .
~ .
s .
s .
s .
$ .
s .
s .
$ .
$ .
s -
$ .
$ .
?1ga6 August 8, 1998
•
co u,
' ....
co
' "' co co
" ....
u,
co co
"' u, w u, w
"' co u, ....
"
CJ)
~
~
H r
-I
I
~
Gl
~
en
"
G8N!lltAL ITDIB
I Unit Cost Ul>it 'I'otal
@encing1 cbain link, 6• biah s 18. 89 LP • .
.renclnn cbatn link, corner ~osta S Ul.17 BacB • .
tencinq, chain link, aata $ 211. il aach $ .
Pencin.M snlit rail, l' hloh (2-rail) t 10.,4 LP -. .
lencina, tem~ora:rv INGPB) s 1, :io LF s .
Sirms, sensitive area bou:nda_, • 2.50 !a<:h • -
STBBP SLOPS rsLOPB INSTABILIT'll
.
WRIT.B-IN I'l'BMS
....
O'l"llllll
NOTlr All plant pri<:ea tte t:rotn Storm Lake Orowers; Mabaab. Natives, Fourth Comer, and SoWld NatlV& "lants
reontil1nttlfl, and tram rroatv Hol.low-a~d Abundant t,ife (seeds).
lOl Clll>ITIIIOi!IICY & M08ILIZATtON,
1'01'l\L'
web•l!GndQu.ontlty\Yotl<,heetFJn,1.>11 Setis,ltlve Areas Bond Quantify worl<,sheet
i lZ76'· 'i/J
$ l,<OO"J.11'L
~I /37(,, Jl.
Paga 7 August 8, 1998
•
CSI
lJ1
' ....
CSI
' "' CSI
CSI
" ....
lJ1
CSI
(D
"' lJ1 w
U1 w
U)
CSI
U1 ....
"
~ g
C
H ,::;
a
r'li en
<l :,;,
ill
"' lJ1
_,_
=I: __,_
........
05/10/2004 15:08 2535390514 SOIJNDBUILT HOMES
SE 1./4 S14--T23N-R5E
PAGE 55
~
_ R-4 -1--~-
-
~ '11:aOOlblial ......
TtlDl IUl!Ellt,lOla
UAld~.IQ:lla __ .. .......
......... 1NIII ....... ---_,_
Jltff'Gll.R _ ...... ..,_
"111114-tDWIE ..,
.......
.. .
-I JDIIQ aJlllin' M -.. """""""' IDltal:fRQUII,:. --...... .....,, ... ...,.,. --"""" --'"'""
---Cll'l'lll'Jll!llft:II '
11:1110a»ffr....,fflllD8rR!tTa , -. OlltJ.IJIITJllll!!tlffllltl'III' .... --------
__ .... ---· _ ..... ... .....
scu r • ,on· es, 11, , .
'"' 0
100
I R-4-j
.... llll9IU,l:I alaf -------~-:::-
4 u,
, . <a!), WE.Tl.ANO Fill. • 200 SO. FT.
'&. ~ BUFFER Dl";TUA"B,,.NCE
· A. El't' R.O.W. • 4,849 SO. .FT •
n.. h' .t..O'!SI ... 0.340 so. rr .
J, ~ 91.JF'Fffl 11:tf'V.cEMOO/.\~ AAtA • 1$.495 SQ, FT.
._ c:::> 8Um:A EN>W<CEMtNT Al<!:< • •S,ooo SQ. FT. (IF REll'O)
{TO DE: 5U.EClm 6T BIOl.OG.31) .
UT, 'O'
A. 9Ul!ffrl ARl:A --$11,• SQ. FT.
B, W£n.AN0 ARD-• 1~,'TCl2 SO. FT.
PERMET!R ROW AAE4 • 24.llgJ SQ, n".
ltMRIOFl PUBuC R1'Wl AR£A. .• M,.~i SO. n.
INTDl:IOR PAIVA'R: RO'J> ARE11 • 17.SZS so. FT.
ST'ORMWAJEJI Dl::TMCM lP.ACT '1(' ~ • 4,'21 SQ, FT •
Sl'ORWW-.TER Dtl'Dl1'tON 1MCT V AR!1i • 35,835 SQ. FT.
~lJON 'TRACT ,. .. ~ • 14.871 SQ. "·
ARt4 OF TRACT "U"' OUTSCE Of 100 'l'tAR WA'Tffl SLIRf"JoCE
L£VEl • 11 Jloa so. n
3,ul
!l
li i ~
., ..
I
• ! Pl 'Ii I .r t1. ! l-i
;1i' .
'Ji
1,
" ;f
©
-;,-
·!"
,'i' :~
I ' " I " .. ' t-1 '
~ ...
·"
.if J t,--~---1
..,,.,
,r..
j
i ~
3
1
~ ..
/
cr
0
i
jj'.
~ i ~
I .,.
'3
1.
0
I
'
\p tr
' ' ,,. --
'
.,
.•,.,.
[t .<&
f ,o-,r.. I
,~\
pit~
~
f ,if
I t
I
j
-d
~
0~ " ... }8 ~~('4, .,.._ J~ ~~ ..
~ >
~i
@~ ,.
~
~ -
;., .-~
:i ~
C
"' r
,1·
'o
1 ·o
'" ~$~ { & '?
;~© '\© -©
~~
I
' -a.:...t:
"': ' ,. ,, '
~
' ,& w
'o ~ ... 1 .-"' ' "'i
!;,_ .••• : ,-.
(· "
?. ~
!C ~ ~t
r.~ \_ ' '
I~ '. '
'" "
I=;
\J ,',
" If ~ .... n·· ... ~ • .....
.. !! . --.~, JI .. o,~ .0,2..1
t
)
;1'
'cl' ~J
1 ; i
C J .
~3 .. ~ .,
:,-08
'
' ""' w
@
'~· -~,
,,. 1~
~·
J ...
I
I
I
I'
I
.I
Ji
11 I
ti
ii'
-l.1
II
11
11
=i]
--
... ._
0 -
"' %
ti
0~
J ~
!i "
;l ~ ,. ~
I
• I
' :
07/14/2004 13:07 2535390514
July!/:2004
Bruce and Joyce Osgoodby
13456 156" Ave. SE
Renton, WA. 98055
206-200-6612
Dear Bruce and Joyce Osgoodby:
SOUNDBUILT HOMES
Confirming our conversation today, you grant the developer permission to enter your property for
the purpose of installing a rockery on your South property line and re-grading your driveway to
match the elevation of the new proposed roadway in the existing King County 136'h Ave. ROW.
SBI Developing, LLC further agrees to re-gravel your dri'leway after the re-grading is completed
and install a new 4ft tall chain link fence along top of the newly Installed rockery. Your signature
below Indicates your agreement to grant the developer of"Evendell" permission to perform the
work described above. We will do our best to minimize the impact to you during the construction
and will communicate a timeline for construction to you as soon as one is defined. Your
cooperation in this matter is greatly appreciated.
ully,
Kurt Wilson
Land Acquisition, Mgr.
PAGE 02
10/04/2004 17:10 2535390514
September 27, 2004
Bruce and Joyce Osgoodby
13456 156th Ave. SE
Renton, WA. 98055 ·,
Dear Bruce and Joyce Osgoodby:
SOUNDBUILT HOMES PAGE 02
Confirming our conversation today, you grant SBI Developing,LLC and its contractor to enter
your property for the purpose of reconstructing a keystone wall located at the Southwest comer
of your property. As discussed, we will step the wall back to your fence. Your signature below
indicates your agreement to grant SBI Developing and its contractor permission to perform the
work described above. Your cooperatfo11 in this matter is greatly appreciated.
Respectfully,
~-··
Land Acquisition Mgr.
.JJ~2o~t;
Bruce Osgoodby
09/01/2004 15:04 2535390514 SOUNDBUILT HOMES PAGE 02
Recording Requested By And
When Recorded Mail To:Mark Sollitto CONFOIU1EII COP'i
~J) ~:~~?1i~0!~33
King County · S,~1 ~i~1v~4 i>i3
Transfer of Development Rights Program
Water and Land Resources Division · CONFOR"ED COPY
201 So. Jackson St .. Suite 600
MS: KSC-NR-0600
Seattle. WA 98104
Transfer of Development Rights
Certificate Number: 78
20 URBAN Development Rights
Date Issued: July 29, 2004
Certificate Issued To:
Name: SBI Developing. LLC .
Address: PO Box 73790
City & Zip: Puyallup. WA 98373
E2061'142
lt~A 1 ~!5~1v!4 ~:a
TAX ~373.80
SAL.& $21 , eee . ee PAGEeet OF 081
This development right(s) is/are transferred from the following certified sending site,
pursuant to K.C.C. 21A.37:
Sending site file number: ~V01.1.Q
Granter: King County, a polltlcaJ subdivision of the State of Washington
Parcel Numbers: 332305-9002: 332305-9062:282305-9101
This certifies that SBI Developing,LLC owns twenty (20) urban development rights
removed from the sending site identified above, which has been qualified as a transfer
of development rights sending site pursuant to K.C.C. 21A.37.
Receiving site tax lots: 142305-9009 &142305-9022 ODES FIie # L01 P0016A &
L03RE03B
The official record of these developmc.tit rights is maintained by King County. If there Is
any discrepancy between the numbe,· of rights identified on this certificate and !he
official record, the official record shall control.
If a_ny of the development rights identified on this certificate are sold, conveyed or
transferred, the person acquiring the rights shall within ten (10) business days deliver to
the King County Transfer of Developrnent Rights Program this original certificate. A
new certificate In the buyer's name shall then be issued.
The development rights may be used only on a receiving slte(s) that has/have been
given final approval for additional residential density achieved through the transfer of
development rights in accordance with King County Zoning Code (K.C.C. 21A.37).
Approved by Representative of the King County Transfer of Development Rights
Program fnteragency Review Coni"mlttee
Signature
Cenificate NumbeT ~
Date Issued 71 29104 ·,
Page 1 of4
-
09/01/2004 15:04 2535390514 SOUNDBUILT HOMES PAGE 03
ii
STATE OF WASHINGTON)
)SS.
COUNTY OF KING )
I certify that I know or have satisfactory eviderice that fiVkf,~ >o< ~, f'-'-1~. i_s the
person who appeared before_ me, an.d said,person acknowledged that he srgned this
instrument on oath stated that he is authorized to execute the instrument and
acknowled~ed it as the Program Manager, Transferable Development Rights Program
of King County to be the free and voluntary act of such party for the uses and purposes
mentioned in the instrument.
To Redeem Development Rights:
State of Washington
Residing at 1.4../'S7.JAI
My appointment expires r,h~(o6
In applying for receiving site approval, the applicant shall provide the Department of
Development and Environmental Services with either a copy of this certificate issued in
the name of the applicant or a copy of this certificate with a signed option to purchase
these development rlght(s). For receiving sites within incorporated municipal
jurisdictions, the applicant shall provide the above documentation to the munlcipal
jurisdiction and shall follow that jurisdiction's development application review process.
Before building permit issuance or before final plat or short plat recording, the applicant
shall deliver the appropriate TOR certificates issued in the applicant's name to the
TranSfer of Development Rights Program. The applicant shall receive an
extingulshment document showing that the development rights have been applied to an
approved receiving site. The TDR Program shall confirm for ODES or the municipal
jurisdiction that the requirements of K.C.C. 21A.37 have beer. met.
Ceni.fieate Number 78
Date Issued 7/ 29104
!',
Pae;c 2 of4
-
-
09/01/2004 15:04 2535390514 'SOUNDBUILT HOMES
. l
·,, CONFORIIED COPY
Recording Requested By And ,
When Recorded Mall To:Mark Solllt10
® 20040811001634
KC IJATER L Lt=lN ET"ISC m.09
-.. ,, 0~ 084 88111 2 ee~ 14:13
KtNG COUNT~, UA.
King County
Transfer of Development Rights Program
Water and Land Resources Division
201 So. Jackson St., Suite 600 CONFORIIEtl COPY
MS: KSC-NR-0600
Seattle, WA 98104
PAGE 04
Transfer of Development Rights
Certificate Number: 79
PAGE001 OF 001
8 URBAN Development Rights
Date Issued: July 29. 2004
Certificate Issued To:
Name: SB! Developing. LLC
Address: PO Box 73790
City & Zip: Puyallup. WA 98373
This development rlght(s) is/are transferred·from the following certified sending site,
pursuant to K.C.C. 21A.37: ; , :
Sending site file number: A98V011 o
Granter: King County a poHtlcal subdivision of the State of Washington
Parcel Numbers: 332305-9002: 332305-9062:282305-9101
• This certifies that SBI Developing, LLC owns eight (8) urban development rights
removed from the sending site identified above, which has been qualified as a transfer
of development rights sending site pursuant to K.C.C. 21A.37.
Receiving site tax lots: 142305-9058 DDES File# L03P0015
The official record of these development rights is maintained by King County. If there is
any discrepancy between the number of rights Identified on this certificate and the
official record, the official record shall control.
If any of the development rights identified on this certificate are sold, conveyed or
transferred, the person acquiring the rights' shall within ten (10) business days deliver to
the King County Transfer of Development Rights Program this original certificate. A
new certificate In the buyer's name shall then be issued.
The development rights may be used only on a receiving site(s) that has/have been
given final approval for additional residential density achieved through the transfer of
development rights in accordance with King County Zoning Code (K.C.C. 21A.37).
Approved by Representative of the King County Transfer of Development Rights
Program lnteragency Review Committee
Vl,c~'
Signature ~
Certificate Numbe,. 12
Date Issued 7/ 29/04
Page 1 of4
09/01/200~ 15:04 2535390514 SOUNDBUILT HOMES PAGE 05
STATE OF WASHINGTON)
)SS.
COUNTY OF KING )
I certify that I know or have satisfaciqry evidence that Mark S~Ultto Is th~ person who
appeared before me, and said person acknowledged that he signed this instrument, on
oath staled that he is authorized to execute the instrument and acknowledged it as the
Program Manager, Transferable Development Rights Program of King County to be the
free and voluntary act of such party for the uses and purposes mentioned In the
instrument.
:q/~ Notary P~bli:: and fort
State of Washington .z ' d
R~sicling at .!4=A-S7 • ,J
M,y appointment expires coMC;,
Tb Redeem Development Rights:
In applying for receiving site approval, .the applicant shall provide the Department of
Development and Environmental Services with either a copy of this certificate issued in
the name of the applicant or a copy of this certificate with a signed option to purchase
these development rlght(s). For recelvlng·sltes within incorporated municipal
jurisdictions, the applicant shall pmV,ide tho above documentation to the municipal
jurisdiction and shall follow that Jurisdiction's development application review process.
Before building permit issuance or before final plat or short plat recording, the applicant
shall deliver the appropriate TOR certificates issued In the applicant's name to the
· Transfer of Development Rights Program. The applicant shall receive an
extinguishment document showing t,hat the development rights have been applied to an
approved receiving site. The TOR Program shall confirm for DDES or the municipal
jurisdiction that the requirements of K.C.C. 21A.37 have been met.
Certificate Number 79
Date Issued 11 29/04
·,
Page 2 of4
G COUNTY, WASHINGTON APPROVAL
~g~j~;~~N~INE
Nd .. L03LOO 13
DEPAR™DIT Of OEVEl.OF'li!ENT ANO f/MRONMENTAL SERVIC,
re~~'" "\Jl!l~--'"'*
~~G UNIT, LAND USE SERVICES OMSION
KING COUNlY DEPARTMENT OF -"5SESSli!£NTS i
APPROVAL NOTES:
THIS REQUEST QUALIFIES FOR EXEl,WTION UNDER
KCC 19A.28. IT DOES NOT GUAAANTE:E THAT THE
LOTS WILL BE SUITAEL£ fOR DEVELOPMENT NOW OR IN
THE FUTURE. THE LEGAL TRANSFER Of THE PROPERTY
MUST BE DOt,JE l3Y SEPARATE INSTRUMENT UNLESS AU
LOTS HEREIN ARE UNDER THE SAME OWNERSHIP.
RECORDING NO VOL_.i'AG[
j4Jl.-'-'IU"li-f,vJCIWJU,<, I 1_7f! I .to?
•
PORTION or EX.WlNEO &. APPROVED THIS~ OAzof ~ •• 2o:21'
5;,qtt Mahk ffe .. 4ti,, ~rw •
KING COUNTY ASSESSOR ~@!r_l<~Jm:.JSSESSOR !Y.[1;4 of _§.ff...,;., s.H. T._g~N .. R . .!:1£..w.M
DECLARATION
KNOW ALL: ,M~ IN TKi.sE PRESEITTS Tt,L.t,T 'II[ ;KE UNDERSIGNED" O\YNER{S) OF THE t.ANO 1:1-..G~IBEO 00 HERE8'f W;(E ~ 80lm°"81' lr<E ,l,DJUSTl,jEJ,if THER(OF PURSllO.'IT TO RCW 5e 17 040P+CVRE ;flS AWUSl}EtlT TO & THC GAAl'111C REPRESENTATION
OF mt l>o'J,IE. N,O l>l;t.T SOJO .&dJuSl\o\fNT IS ~-~ ffiE'. f'liEE cotl5ENT ""10 ~-~ORDANCE ~,lHE D£SIRE:S OF THE OWNE!l(S) IN WITN£SS WHEREOF WE'. HAVE: SET OUR HN«lS »ID I t,t, lfl~.
•' .... -.,• ... _, \ 0 ' " · · ~ m· ··· ,~ orru M1.I -. ~@ ~_;,, -~· Y~&__-, ------~ ,,.s,,,,P,,;i, Yd'.'* ~:.li ~ .-.,.~·~:'~r'!.<\,
/~iON·~\ f t8~~~\ \
\ \ """' l _J
l~~-r.;i~-·~.I
STAlit'"6t'-~ASHI~T(IN': _./ ] ., f (~~~ \~~)'11,. $TATE OF WASHINGTON.
•·.-.,~~.:~.o~,,,• /f!t'"~~-_}.;:=' / ~ f0 ti~y COl.ViTY CW f"{eY(:,e..~ J Y,,-' .,· I " / ~w,~, .,, J "
On th1~·day per1om1.~!Y appuir~_!;l-"betor• H .-::• \ 111,\ ~ On thle day p1r11onally appearecl b1fo,,e me
ROBERT ,.._ I.WR MIO _CL'TtJ[RA[ ~ •• ·•· \~-[~~.... 0.,,'w1) ,._ HY8LOM Al'fO OEBAA L ALBSO ..... ~..,....,. to 11• kno><n to_l>ol·tt,.• lndl.,tiduab d11c~1b1d in af'l?·wno ,~ t.o ae. kno-to b1_th1 1ndiY!dua1a ducrll,ed ,n and ...,0 executed the "' thln a...i. (c,'-ego,ng in'ltnnNlnt an11· .:· .. • °""'.._-eucuted tne wltrnn and ror,golng Jnltru .... nt and
acknowledged that u,ey 5lilned tile•!!• H thel.<:'"frn .,· .,:· , ,,. eckno·dedg•c! that they signed the.a...., as tnelr /ree
e:,d volunhry act ene: dud, tor i.r;hs .• GOd_,~\Jri;,:,.~u._,,· .Y :;/ and volunt•ry act and aeed, lar • use~-~Od purpa~n
l'lereln m•ntlons~. , L,.,.'~·'c." 11,diJL-) ., r:/ ··. herein HnHanso. . (\t, . t, , ~~t";,~~~~c La,vn· . . 1./'l-JJ.t}..'r ,n O YUJ,1 ,17 .... • l·O'r
~pi~ntrr,enl 10.og · li c; <-.~::.::'/ .... I /0 ·Ok6f( -O<lte,
oLo LEGAL .-rfEscR1P-TibNs
LOT A (P.aRE... f!4Z30:5 0022J-".:· toJ.433 5q Ft \·.
THAT POOT1CN Of nE 1-0RlH J'lll_.F Of Tl£-~ HALF CF TI-I;:. ~1™EST 111ARTEA CF THE ,um•IIES1 ll.J,O,Ri1:JI
CF THE 50011-f.AST l).JAATI:llci:F SECTI!N t~-'TlJNtl9iIP 23 ~ RAN3E 5 E.-lST W.l,t, LYIN'.i EJ.STm.Y CF n£ EI.SleR.Y
AARGIN CF 156th AVEN..E.st •s OCEIEl.'ltl KOO tp.my 6Y U;c--o IECCR:EQ U'aA KW. C(lJHY IECCRlil'G NJ. 1094243;
TOGETI-EA WITI-J A tol-EXO.lBlYE EASEW0/1" Fo, Itq:ESS. €61£51; 00 UTILITIES OV8l I.KER AIO 4CRlS5 Tl£ ~TH
l!i FEET CF U£ \E'ST.·±$7 FEET V.S.1£.lSl.RD FFO\ nE EASTffi..Y ~lN Q= CCUiTY OOlO F\IaiT-<F·W~Yl ll' LOT 2 Of
SIO'lT PLAT l-0. 878~ l'ECCREl .lJIEl KOO q:µ,lTY flW:lll_.lµi t,{)_ 80022'3l639. IEa.Hl5 CF KOO crum. NJSlin;T(}t
Al..9J T!XlETI-£R l!ri'H A ~I\IE ~: Fm ~· EGESS »o UTn.rrIES OVER \HSI ~ .lf.:RliS TI-E
SOJl'H 15 FEET ._(F U£ E,.ST 22 FEET tF Tt£ IIIEST l99 F.Elc,, AS ~'ffOt TIE EAS?m..Y IIAA,lN IF SAlO 156th
Aveu' SE. ci,::11"11.l PCFITIOt!'U' THE IOll:,,r t-11,l.F CF n1;:·rumtJ-el..F Of TI-E ~Si WNITEJ:I CF Tt£ romtEST
~y Of~l£p. ~Jl~\~·~~r::nttl I~}~--~ IDlTH lWa 5 051:_.~.II. LYIMi E.lSTE!l..Y IF TI-E
r~;,;~~;~07:::,.f~:;,L,~f,~;·;;:;;·~··· ..
E1CCl:J'T m.o.T PG!Tla-1 Of um EAST HALF CJ' TIE IG'ITHEST (JJ,/.ffl°El'l"tF Tt£ ~.l$'.f' IJ.IARTEA O:,s.utl:~
~~ ~F~ CC1ffR CF $.UC EAST ~.(F TI-£ tamt£ST,~,:~ THE ~"T ~ /
~~ ~~~ ~CF~~25~~Jiff:i-~~=~l~~-~:,,,/
JEST LIIE CF" 51.ID EAST HALF CF n£ tam1£ST a.wlTUI CF TtE 6WTl£AST IJ.WA"EA; ~ SOJTK 0077U5"
~~£tt~\~Tt£E~1~.t:f~SA:o:~~ L~ ~~~~~ ~ 1';f~r-~ ::"
~ ~ ~y ~ml~ ~V:I~¥ ~~~;~C[KE) 1,wi ~w; -~,:£CXfOOO ~;,a;ii~\::.;:
SITUATE IN fl,£ CD..HTY CF Kit«i. STATE CF IUS'llNGTcl'I. .,.,,., •.• ,• .
'°.-. s.l;J·~~EY9.-~).··:-,c:'c)RR't<:r~~~, LEG..;~·,/~q~-l:1PrroN
-. ~tj$f~#~~~?~~~l£-~~.:~~R .. ~·-;.,CTI04 14. ro.t&fII' 23 Wln{ FWa
~ . .. .. ..
~ n1ufkRmt1 IF. TI-£ SttrJ#"~ a.wrrei{ CF ~··"-iam~s1::~TER CF Tl£ SDJ1l£AsT WA!lTER Of' SA.IO SECTION 14 Clp,G &JJTll "CF"•i1¥ Fi:.u.owoo i;e'.DUeED:lltE: .,·:
OMel:IMi A~·:tt-e·llffll;(IS>-·~ CF~-~ ~r ~ CF THE /Glnt£ST·QJAATEl1 CF TIE ~1
OOoRnJ1; Ttea. 500Tii 00~1· IEST ..q__(tG n£ EAST LIit? CF SI.IO &ul}£.lSJ C1.J1R1ER !35.66 Fm TO TIE
!EiWm.G CF SAIC LDE; 1t£M:E ,amfoow.'51· IEST, eAAAU..a WllH Tl-£ ra:ntt LDE IF SAID SWl"1£lST
111ARTUI tF n£ N:RTaEST ~,tF Tt£ !µJTIEAST GUlF!TU\ ~.61 FEET TO Tl£ 1£51 LOC lf SAW EAST
::; :CEP7 =:a=!:::==.:=== ::w:: ::Ll:~lrl> ~. 2500004:
SITUATE IN 11-E co..trn' CF K!Nl STATE CF II~.
SURVEYOR'S NOTE
Tl£ /el l.EGlL !EDIIPTilJ,I FCII UT/ 9 lil.s BEEN lflITTfiH l£IEtN WITH n£ INTENT tF S..lMlN.I.TIK: Tt£ POSSIEl.E
HIATIJS BETiEEN 1rE SW1H L»E CF TI£ l'IU'EFITY 1-BEDi OfSCPJBEO NO ,l£ NJlJH LJIE CF TI--E ~ 14lIOt
.l,().JJJNS TO 11-£ swrn. 11-£ POSSIBn.m CF A HIATW IS CAlaO BY A OIFFER;HT S1olAT?I-G P()Jt,T FCII Ir£ F.!11'.&Tm;
10 UT/ 9 THAN Tt£ 4C1Uo>L DEED teiCUFTlDi FOi TmT EXCVTICN. THIS JEW a::s:::JIIPrnJ,1 CIESCRI2£S Tt£ /OiTii Lit£
CF TI-£ EXtEPTD>I IN TI-£ 5.uE IWtER AS n£ CEED FCJ:I Tiil.T EXCEPTICN, Tl£Rc8Y Rl'.ITECTTo6 Tl-€ 1NTEGIITY N'IJ UM"IHJm CF 11-£ LEGAL IESCAIPT1CN5.
·· .. EASEMENT, COVENANTS, AND RESTRICTIONS,
,(iAOM ;;~·~!'1.&.HOt!.}ITLE INSURANCE COMPANY SUBO!VISION GUARANTEE No. 870890
ITEM -;: •' E..I.SEIENT: ._.'..GRANTEE; !<ING COIMTY WATER DISTRICT No. 90
.• ····•~· :~ .. :WATER AND SEWER MAINS
_ .. ,· ·.. ·RE~~~t~Y ~~~~: ~~c~~I.% ,!~~~1~10551
.:"'iTEM a .. '-EASBIENT!--'iRANTEE: KING COLNTY WATER OISTRICT No. 90
' ~POSE: lt.c:J"ER ANO_.SEWEB..>J•INS
AFJ'i.A .I.FFE(;l°f:D; NCIATHERLV J"d-'·f~T OF P~RCEL A
•. .. ef:COROEO:.~· ,XJJ,.¥'·11. 1975. i:ie:coRO.lf"G No. 7507170570 ~ "'"£MO&,;, II)' "''"'"-"'o.
ITEM'.9. EASEMENT: ·."GRANTEE~·:Pu13ET SOUNO POWER & LIGH"J. 1r.oo-,.o._:t-,oe><:>1wo
RECORDER'S CERTIFICATE .................... 11:f',
FILED FOR RECORD. nHS a:!/ .... OAY DF f\!kr, 20 Q!,\. AT P,M,
IN BOOK __ (JK.oFf.-.~ PAGEJ01.AT ntt1REOU£ST OF
G. PHIL SARGENT
''Wi!AGtlC·····
,'1 . LL ,I! 1/-,d.4:-,;~i;·'·
l.ANO SURVEYOR'S CERTIF!CATE
THts 80llNDARY LINE ADJUSTMENT CORRECTLY REPRESENTS
A SU~ MADE BY ME OR UNDER MY DIRECTION IN
COHFOIU,•,ANCE W1rH STATE AND COUNTY STATUTES.
ii QVC?.J G. f'HlL S>RGM J'J•1•s 1-tS-01{
""'
. . .·. PURPOSF!. ,afCTRIC Tf\A1$1USSION OR: OlSTRI~IlON
AREA.:.l.i=fRt"TED: A!:; C!iilsJf!l,lt:TEO 0¥$1 PA.r:it!fl er·-,,.-
·· •. ;: •• REC_(]RDE!I{ FEBR~:?3_. ·1s~. REcttAoms Mo. 9.562~30.C'lf.i..
ITEM 10. RIG1:f1:TO IW<.E"NECE"SSAAY GUTS OR"¥-I.LJS UPOl:,1.Vn-fE.·.u.ND .~·.,,·
·•.... J1iREIN;!IESCAI!lal. AS ESTABtI~ W:·VOUJkE 31 OF ., .. •.=!~~~~~ ·~rn~r-it~?_E ·,ns_/. .;:'· .. , ..... ,, !" . .:.''':, ... ,,,·
~D S "· '., .... -····1···' . Marr/.Nyblom. Bound,y~Lin.:.-AdJus~me~.~ ryco urveyrng, nc. . , . ,.--, . ,
1 2714 VALLEY AVENUE EAST OWN BY • 0.TE l;'ftlNTEO Joa NO
SUMNER, WA 98390 LS 3,/~&/2:004 . 20030\'2
253-826-0300 fox 253-826..:.9703 CHl<O. 8Y
P.S.
SCALE ,·-100· ·.:!i.HEET j\, 2
~
IG CO.LINTY, WASHINGTON
sou£ibARY LINE
ADJUSTMENT
::i
• ,
~
AREA
'°' CLO -·
R-ECOROlNG NO VOLt;·AGE
ua:-e F••t lo 11
NEW 1-,wo· .... SCALE: Q;'2'Q NO .,,l,.D3L0013 .. A
B """" ""'"' '9
,00 0 LOO 200
•NOTE: PORTION OF
Cent_e•_. '~tion_ ,i:~rner .r,:::·· I-_ ~ __ _
Sect,ll,n 14, .fncosed :.= I
:S
:;l
~
lHE:HGIRTH UN[ o, NI:Ml.Ol" a IS al 51.J--_ l'al!l0:11,
WENOl<TH U11E Of'NNUlTA IS ~IIIIIIIJ.f;l.Wlffi iONOJOFWSIJl.l111 Of'
THEEXISllf<• -o.otNTI.JMt.~ 1:in-lA'IEKll:U:• 1111:l'M-U. !fW 1/<1 of _§fl_ 1/4. s.J.:1-_, T.~J_N., R.Q.c: .. w.~.
r.,rfon P!P;,:1" with 8~-9"9,S I ---... \. I I J ttrr· DERRl'HURS'..r
t.·-Pin \t1SITE?" ~uly, :z904 .. / ,· .. I ··,·-:. I .. ,. I • cen;oo 0';oo VOL.166 PAGE 7,1 J" Bross Cop ln
HELD peJ nm,rencild .·.· I e·-~ l ~ ~ j A~-:,. I 6D -,. c.,p & P\it? I I Concrete Cose pe survey;~~) ;_;-· · .-.=1 · I 1~!0ll ,. --.,. 3ll6C50 ~19 ,,,-,.·,,:-· J:iii<:D Of!Jd' ~ .. -. ~ 01~1 f...,.. P., c..~so·i I LOT J I Lm." lS ROS 9508099008
. --~-==----=---:.~t_r-_ :-;~;~~~-I 1;. -/0!-:-mf._ ~~ -ms-i:;··-~ -,C'" ... !,9. -·--: -------____ ~~ _ .! ~ .-___ ~ _ _ ~ ~~~~:~~:Comer -----, f --·1~_;~~1fQ!E ~--___ ll_~-~~W~.!...~-+.;.\ ll 18tw'mp~_....,._~~-NJJl.Jm .... 12~« rw..,.,,/ _ w~ '!.o~s_t~-str;et i
T
~~ 4 ~ ~-,., """"' ' ~ ---::;;~---\"""I -.;;.~ -;-----#.Jr~ = _j -~ 9li9'17W"f WliAI A ----+-----J•_ .Jl v-.., I ./J:..,'4?.JC,:~ ,s -~~, ~'\ \ .-.rer. r----..-----------
1.«,3,l(loo,c; 1:t,· ... ;o·'tV 4 ·,~·.,,_,_ ••• ·5~ ..--f· "--. ., -· ~ \-.·. 1·1. .:.-: ,.,1 Pr'iQ)os 1 -
• -· i'!'. ,-~1 \ .,· <;.q.., ... ,. • •• --1 f:"' t= ll006 I I •,, ~ ~ 2 , .,-..: . ..J-,' , .• ~t1:'.'!·" . .;,C ->l \. 1 I I , •... Lot A~ .. ' ,.·\ ,.• ~--, ;' I "'1'
....J ·• .. ··---:93m· .. A" .IL:.::.:. .... """.-.·· •.2"1· .·.-.. . · ~-1 : \v I t Ct:i I
•-I 1-ot=-,c···· Slle"lS':ll"f6il.?l· ~:-~i'!,~;~~·;™ .. '~-tt.:i.c.o ';·>-9;:':t·:··."ft 19... j· I .I----J. ---<bl
14fiJCl(l),l'I I l)',JZ" ll~lV<ltll ~-::.·:.,·::.~•,! ·,~_,. ::, ... ;: 11 OPlltt ::i:,
j wnol"RII< ~ Jfl:m!lll2 · ~:.: ·-·-·-~?JB ""'I l.j!'j751)0Jl!i c::I
~ .i.oiuu Lot 2 · · _ .... ,,.,. ~
I 1 • UU.SPOIU]J KCSP 878133 ~-.. ../ "" J _!;P-!,J ,_.. ,,~!~ . 8002250639 ··.,.,;. ''· 1 I /·' CEDAR }A.,.~ "'(I
I ·· ,. ---:.:.:.,,,...... ·------------------. -,. c.op ,,,,· ,,,,, ........ ,..... \: I .:!FfVE ACP..E r;;,,ir-.''S 1
J·".-~ r...t.~_, ___ , .. -·· --·· .... ,..,"'··-"~··_. .. ;.,; .. JI i-~ --., .. ~ --vvi:-··: .. F;,·;.:;;;.: :S/
,,·· ~ ,, I@ ,: ""' :'' ,,· .. ,~,._,. ':.O! '<:t,
•• I O.~ S~l~ler . I".·"() J-•' CO
l lt2)l!! 00-12 f O....in/;ek!-rl ):--:-:. .,,;. ,{ :S 1.t·."· I ,. VERTIC.lol DATUM """'11
5'W d f ~1001·::::it PR(}_.f0SED° "Pri[T ·. Iii _gr· JJOT 2 KINGCDUNTYSUAVev CONTROi. P{J. INT f~ENT210r
: · uo •r,c +:"",5,-Ev.<:ndell ti'.! I .-. · ELEVATIUN 468.87 /
;.,{,·:-' a'i.;',~,-·of sU1'.0~( · ·"""'" ----i •· LOlPo'oi'ii .,/· ~ ,_ -:-{ __ ,· ;!u~:'Es~: ~!E~om $JHION ,
·'t°Jl,.,f-···nns SURVEY 15 ca~SEO DNA PAEVrous SliA'/l"Y OF : ""'"'"'"''"'E•s,...,o,H""'',oar ~IT-t<P-atesx DATA COLLECTOR
co 1111s l'Rtf'ERTY. P.EcoRD OF ,SUIWl::v AfN 9s_oe099000 0 .... 1r : a """''"' ... 11£ :Dmbs, -~"' sm!tll.. I!-· 1 I
il.) KI14G ,~a(M\. ~~lti:ii:-:w,• t<l.llS !E15! : "< I PROC(OUR£ USED
·:,. .q I ij; .,' _·.· ·' .. .. ' :S FlELO TJIAVEnSE Ii. EU:"CTRO!HC DATA COLLEt:TlONI
··-·.,~"J·-"'·llASIS Of B[ARINC .( /.' _. ..-· ·t-li!J:\I;~~-:-,;::i I I 11EETS OR EXCEEO:; J3.:-lClD-O',O I 8 MONUME.~TS::THE W!:Sf,UNE CJ",,TIE SOUTH!l-1.Sl_[JUJJITER ·::. : ;;cr~'?'9 CO v-, "'•lffi AFN950GO!i9008, ROT~'l'rn·:.0·1s·4g·_,; •: _,-:.. :·.:]II" .... ,..,... _ 1 ..!!2!l... C ,?; OF SECTlOl'I l4. AS -s-t[JIIN _or.I AECORO Cf.• SUlYEY, ·: ' ~-'""I J i'51SO 009Q
°i ~ ·::,,_ ,,.•·' -7-:f--·',";".,--:.:> ,,,-~/-.::::;----~Of~~~~~~<F-~~°""':!:"--.._ ! tf lotONUlotENTfOUNOTH/SSURVEY
Cl,) "'1 :;:!; ~SU!!-~ .,•' . '•· ... ,.,.:,• . :.' ><-x?S-~-><-~-J.-x-><-><-><-x _ 1 r--0 FtU<ll PFIIPERTY COONER AS JJ,(lJCAT£0 :, 'I~ PL.H Of CAROL~ood' . .''M'l4-·7t0h2110!!8~ •• .·. I . ,y .. . :: ::-,... . I • SET REl!AR i; CAP LSI 6228/3<1145 I q., 1v PLAT OF ROSE G~R~S. AFN 6?61014:: ''· J Lul 7 / ,:· -:·· 4• Bo.<5~d w·,;:.;
1
1 <J FIRE HYDRANT §::1
~] ~ ~~~.,gFO~l~~~e~/~~N;B~~:~~:u.lJ'~-.5597966-·,f)p··-''s: . .t:,:l / ::·~ .-.-" feo_•.O .• lla'.'l·,. I ll. WATEl!VALVE: ~,
-AECOFlO OF SURVEY, Afll 9~08099008 (R);._ 11, \.;-.·,., lot.a· -.:: 2e.t<"Jt ·'··.,. \!;J' WATER METER ~·
"' 2,'. ··::-. .,•' W!!O(l."llCUI J '--1,' !f .-:·· I SL Ji. nECTRlCMEIER '
I el _ ~''..:_'_,,,_,,).;:.•V • . . ~-E -51¥f'Z/.'D"E"t;:,j-55,.... t-"o750~ 0 PHONE 011 CABl£ PEOESTAL 5 1 · \ · x-0< x-><--X I I m' CAS t,(ETfR \"I •-~ SE J38lh Place ---.,,, .. ..:· L 4;·11 ,.,,-;::, ~-::::-;. "=s~ _ 1·i -~-CHAIN u_NK 011 WIRE FENCE ~1 ""-' ~ j I .-. "9 .-:-~ ,•--......---,.. -,1, c.op t --IIOOCI F<eNCE \Q , _ _ _ _ ·;. ,... ;:Frnce .. Born . • 4'l-1og wi,-LB~ -__ ..::--.JI-IIATfRLlNE ? I
""-I ~ ] _ /, ·: •.•••. }··_..-, Encn,QClia .. r~.-..:e r-· I =BlJI.OING_S :.:1 'i<J G d Lot !I ;: 1 loot" .;: ..... ,,. (M) M£ASI.JR£0 ":! 1~ ar ens ' 1 •· 1~ _._. ,, .,:· 1 .J.,
±
§ VOL tJ:J PAGE 69! lol 10 ' I .. . -PRf:JP~$ED p4.r 11 1::.aJ: 3 . I
-, Nu:h:ols Place S' 8rcss Cap in t
'------"-J J:iJ3POOJ-5 _ .. l,. Concrete Ccse per
; , -: • •· ROS 9508099008 . . t:.-._. .. . ··-.,.-Nat Visited
~-------------------------~~-_J_±_4_t!!-~t}"~'!.!.__ ----' -__ ·_ --:___ . -__:__.,,/~ ----~~··:,-· ·--i;l:i~~os,t4 c~;~;.sy
South 1/4 Corner CONC MON W/COPPER PLUG Slla"56'56:E 2617.72 'Sil!l'111i'07:'( IRJ ::,-··~ ----,.--_.~
Section 14 VISITED March, 1999 •. . .
~ Survey & Map~lng-.. b( ..
Dryco Surveying, Inc.
12714 VALLEY AV£NUE EAST
SUMNER, WA 98390
253-826-0300 fax 253-826-9703
" .-:· .,-.-·· y ·=-,,, •.
Mair/Nyblom.''lloundiy LirHt Ad justmenV
;: ,. ·. .-'"'=· '
OWN. 6Y -. I [»,fE f1llNT£ll I JQ6r NO_~-.. _.:-
LS .. · .. ·.7/J-.°i/200•· (2003012,/
Ct.KO. FJY I sc,cc '[ s~_n.. .J,.
P.S. 1·-100· ··::.2 or.:' 2
08/18/2004 12:29 2535390514
AFTER RECORDING MAIL TO:
Name
Address
City/State
SB! Developing LLC
PO Box 73790
Puyallup, WA 98373
Document Tltle(s) (for transactions contained therein):
-1. Temporary Construction Easement
SOUNDBUILT HOMES
Reference Number(s)-of Documents Assigned or released:
Grantor( s): (Laot name flrsr, then fim name and mlddle Initial)
1. Mair, Robert
2. Mair, Clyderae
[ J Additional information on page of document
Grantee(s): (Last name Hrst. then first name and middle Initial)
l. SBI Developing LLC,
2.
[ J Additional Information on page of document
Abbreviated Legal Description as follows: (I.e. lor/block/plat or sect!on/township/range/quartcr/quaitor)
ptn of Nl/2 Nl/2 NW 1/4 NW 1/4 SE 1/4 Sec. 14 Twn 23 N R 5 E
Assessor's Property Tax Parcel/ Account l\lumber(s):
142305902207
[ X J Complete legal description Is on page 4 and S of document
PAGE 02
[ ] I am requesting an emergency nonstandard recording for an additional fee as provided in RCN
36.18.010. I understand the recording, processing requirements may cover up or otherwise
obscure some part of the text of the original document.
-
08/18/2004 12:29 2535390514 SOUNDBUILT HOMES PAGE 03
After recording return to:
TEMPORARY CONSTRUCTION EASEMENT
Reference#: N/ A
Granter: ROBERT MAIR and CL YDERAE MAIR
Grantee: SB! DEVELOPING, LLC
. Ulgal Description: PTN ofNl/2 Nl/2 NW 1/4 NW 'A SEl/4 SEC.14 TWN 23 N RS£
Additici!!al Legal Description: Attachments l and 2
Assessor's Tax parcel ID#: 142305-9022-07
The Grantors, as named above, for and in consideration of mutual benefits, do hereby grant,
bargain, sell, convey and warrant to the above named Grantee, its successors and assigns, a non-exclusive
temporary construction easement for purposes of constructing, reconstructing. installing, enlarging,
operating, maintaining, repairing and replacing an underground stonn drainage pipe and associated
appurtenances over, under, through, across and upon the following described property in King County,
Washington:
. That certain perfectly square area of land, in the southeastern most corner of the property described in
Exhibit A ("Parcel A"J, that has, as two of its sides, forty (40) feet along the south boundary line from the
southea.qt comer of Parcel A and forty (40) feet along the east boundary line from the southeast comer of
Partel A ("Temporary Easement Area"].
For the purpose of constructing, reconstructing, installing, repairing, replacing, enlarging, operating
and maintaining .an underground storm drainage pipe and associated appurtenances, together with the right
of ingress and egress thereto as required and approved by King County, for the purpose of providing
drainage service to the property described in Exhibit B [~Property").
This easement is granted subject to the following terms and conditions:
I. Grantee agrees to use reasonable care not to damage any structures or utilities on Parcel A and
agrees to immediately repair the same at Grantee's cost and expense if Grantee, or Grantee's agents damage
Parcel A structures or utilities. Grantee further agrees to use reasonable care not to damage the landscaping
on Parcel A or the Temporary Easement Area and to return said landscaping to at least as good a condition
as it was in on the date of this Amendment, prior to expiration of this Easement.
08/18/2004 12:29 2535390514 SOUNDBUILT HOMES PAGE 04
Construction Easement 2
2. Grantee further agrees to indemnify ancl defend Seller for any claims resulting from the acts or
omissions of Grantee or Grantee's agents upon Parcel A.
3. This Temporary Construction Easement shall expire upon the date Grantee's construction of the
storm system. and related appurtenances is complete and Granter has signed a non-exc.lusive permanent
easement within the Temporary Easement Area as are required by King County with respect to the actually
constructed stonn water system and appurtenances described above. Grantee agrees to use its best efforts to
have such permanent easement area not exceed the south 18 feet of the east 25 feet of Parcel A, and to
minimiz.e any above ground appurtenances on Parcel A. Notwithstanding the foregoing, Granter shall not
be obligated to execute any permanent easement which so far exceeds the south 18 feet of the east 25 feet of
Parcel A as to, (i) interfere with any structures or improvements located on Parcel A as of the date on which
the easement is requested, or (ii) to materially diminish the fair market value of Parcel A.
This easement shall run with the Property, and shall be binding upon the parties, their heirs, successors in
~~~ . ~
IN WITNESS WHEREOF, the Grantor has caused this instrument to be exeaited thiJJ.. day of July,
2004.
c:~ a -zyezu,;_ ' Nl 111, D,
Robert Mair
08/18/2004 12:29 2535390514 SOUNDBUILT HOMES PAGE 05
Construction Easement 3
COUNTYOF~e,yCQ.)
) ss
STATE OF WASHTNGTON J
On this day of J:JJ · day o , ~ before me, the undersigned, a
Notary Publ.ic; in and for the State of Washin , duly commissioned and sworn, personally appeared
ROBERT and CL YDERAE MAIR, to me known to be the individuals described in, and who eitecuted the
within and foregoing instrument, and acknowledged that they signed the same as their free and voluntary act
and deed for the uses and purposes therein mentioned.
WITNESS my hand and official seal hereto affixed the day and year first above written.
-
-
08/18/2004 12:29 2535390514
Construction Easement
SOUNDBUILT HOMES
EXHIBIT A
PARCEL A
PAGE 06
4
THE WESTERLY 199 FEET OF THAT PORTION OF THE NORTH HALF OF THE NORTH HALF
OF THE NORTHWEST QUARTER OF THE NORTHWEST QUARTER OF THE SOUTHEAST
QUARTER OF SECTION 14, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M., L YJNG EASTERLY
OF THE EASTERLY MARGIN OF I 56TH A VENUE S.E. AS DEEDED TO !GING COUNTY BY
DEED TU:CORDED UNDER TU:CORDING NUMBER 1094243;
TOGETHER WITH A NON-EXCLUSIVE EASEMENT FOR INGRESS, EGRESS AND lJfILITIES
OVER, UNDER AND ACROSS THE NORTH l 5 FEET OF THE WEST 187 FEET (AS MEASURED
FROM THE EASTERLY MARGIN OF SAID \56rn AVENUE S.E.) OF LOT 2 OF SHORT PLAT NO
878133, RECORDED UNDER KING COUNTY RECORDING NO. 8002250639, IN THE RECORDS
OF KING COUNTY, WASHINGTON.
SITUATE IN COUNTY OF KING, STATE OF WASHINGTON.
08/18/2004 12:29 2535390514 SOUNDBUILT HOMES PAGE 07
)
Construction Easement
EXHIBITB
PROPERTY
5
THE EAST HALF OF THE NORTHWEST QUARTER OF THE SOUTHWEST QUARTER OF
SECTION 14, TOWNSHIP 23 NORTH, RANGE 5 EAST, WILLAMETTE MERIDIAN, IN KING
COUNTY, WASHINGTON; EXCEPT THAT PORTION OF SAID EAST HALF OF TIIB
NORTHWEST QUARTER OF THE SOUTHEAST QUARTER OF SAID SECTION 14 DESCRIBED
AS FOLLOWS: .
BEGJNNTNG AT THE SOUTHEAST CORNER OF SAID EAST HALF OF THE NORTHWEST
QUARTER OF THE SOUTHEAST QUARTER AS THE POINT OF TRUE BEGINNING; THENCE
NORTH 25 DEGREES 21 MINUTES EAST 523.99 FEET ALONG THE EAST LINE OF SAID EAST
HALF OF THE NORTHWEST QUARTER OF THE SOUTHEAST QUARTER; THENCE NORTH 88
DEGREES 7 MINUTES 58 SECONDS WEST. 653.61 FEET TO THE WEST. LINE OF SAID EAST
HALF OF THE NORTHWEST QUARTER OF THE SOUTHEAST QUARTER; THENCE SOUTH 0
DEGREES 27 MINITTES S SECONDS WEST 525.82 FEET TO THE SOUTH LINE OF SAID EAST.
HALF OF THE NORTHWEST QUARTER OF THE SOUTHEAST QUARTER; THENCE SOUTH 88
DEGREES 17 MINUTES 35 SECONDS EAST 653.84 FEET ALONG THE SOUTH LINE OF SAID
EAST HALF OF THE NORTHWEST QUARTER OF Tll! SOUTHEAST QUARTER TO THE TRUE
POINT OF BEGJNNING; AND EXCEPT COUNTY ROADS.
THAT PORTION OF THE NORTH HALF OF THE NORTH HALF OF THE NORTHWEST
QUARTER OF THE NORTHWEST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 14,
TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M., LYING.EASTERLY OF THE EASTERLY
MARGIN OF 156111 A VENUE S.E. AS DEEDED TO KUNG COUNTY BY DEED RECORDED
UNDER RECORDING NUMBER 1094243;
EXCEPT THE WESTERLY 199 FEET THEREOF, AS MEASURED FROM THE EASTERLY
MARGIN OF SATD 156111 AVENUE S.E., LYING SOUfHERL Y OF THE NORTH 30 FEET
THEREOF;
TOGETHER WITH A NON-EXCLUSIVE EASEMENT FOR INGRESS, EGRESS AND UTILITIES
OVER, UNDER AND ACROSS THE NORTH 15 FEE OF THE WEST 187 FEET (AS MEASURED
FROM THE EASTERLY MARGIN OF SAID 1561 H A VENUE S.E.} OF LOT 2 OF SHORT PLAT NO
878133, RECORDED UNDER KING COUNTY RECORDING NO. 8002250639, RECORDS OF KING
COUNTY, WASINGTON.
ALSO TOGETHER WITH A NON-EXCLUSIVE EASEMENT FOR INGRESS, EGRESS AND
ITTILITIES OVER, UNDER AND ACROSS THE SOUTH 15 FEE OF THE EAST 22 FEET OF THE
WEST l 99 FEET, AS MEASURED FROM THE EASTERLY MARGIN OF SAID IS6 111 A VENUEN
S.E., OF THAT PORTION OF THE NORTH HALF OF THE NORTH HALF OF THE NORTHWEST
QUARTER OF THE NORTHWEST QUARTER OF THE SOITTHEAST QUARTER OF SECTION 14,
08/18/2004 12:29 2535390514 SOUNDBUILT HOMES PAGE 08
Construction Easement 6
TOWNSH1P 23 NORTH, RANGE 5 EAST, W.M., LYING EASTERLY OF THE EASTERLY MARGIN
OF SAID 156TH A VENUE S.E. IN KING COUNTY, W ASHJNGTON.
CORE DESIGN, INC.
BELLEVUE WA 98007
Regarding Hearing Examiners Condition #19-a
Core Project No: 04009
11/10/04
On Nov. 2, 2004, a field visit was performed to verify/review the drainage issue
associated with the existing ditch in the vicinity of the easterly line of Lot 12, Rich
Lea Crest (address 16046 S.E. 142nd Street). A drainage complaint was filed by
the adjacent homeowner, Don Gregg, on Jan. 10, 1997 (complaint #97-206). A
condition of approval of the Evendell Project includes stabilizing and re-grading
approximately 50 to 100 feet of the existing channel to adequately resolve flooding
that has occurred in this area.
Based on field observations, this work appears to have been completed. See
attached photos. The timing of the work performed is unknown, but probably
occurred more than one year ago as the ditch excavation has naturally re-
vegetated. The ditch is now approximately 5' wide and 5' deep in this location,
which is substantially larger than upstream or downstream of Lot 12.
04009 HE Condition 19a, 11/10/04, page I
:"t------~
) .,
' +'
,,
-?"IQF t,3.43
{. ' •,.
5 ;
U ' j ..
L6C"ft7t OIN
f;:XL'77'IN (J·
Dt7.1H
®. L-oo~,~{:. w&5-, e ~J;~7f;(Z.t,,vvx: () ~ ex15,,wf:>
l:::>\TCH /tto..-.J6 -rr1E IYOf2.7rt /flo(,;~7y ltl'V'€ OF
l-o-r l-Z../ fc.A-7 OF-"/-/CH ~FA (!flF"?i F/Z-On-IV..€.
COa~~ll C:>1=-L.-01 11,. \/\i'~H lCr ftf'Pf>o:,(1V1t'i7t;t,-f
~ ' "t>E-Ef' ,, 5' w ,t;, e A7 -r,-.,t ~ o 77 oM A-r-> r> lf!l'-171
W, t7 G-A-7 ll-'1 ~ -?"c:::>P.
T.;>,-rrH \N lb'Z.,...,( AvE Sf (Z..1C>"t7-OF-L.v~y ff{.,oM,
1\)_'f3;. l!e>(t~.At c,-F-WT LI , Pvt"r-r Of fZ..\CJ.1 l-~'4-Cfl~r,
\ I
~ l O -1..0
~· L ooic,~ 6 (\) 0 ~.,....., (!:! C 'f3 ,,•.rr F fZ t.1 w E Of-~)('.L5'7 J11Vf>
1:, \ ,(!)-t 1~ }b-Z..R f+vE 5£ f2.1 6'1'fT-Of=· Wl+y (Sit-;,,
/ OF-l-OT 10/11 0~ PLA-7 OF TZ-IC,t /....EA (!'p.£57, 1:::>1,('J.,(
l'7 ft-ff ~oy_, M /t'7 &t-Y 5' °'t>Fr;p ft-vv'#i;> Io '--z.v · vJ •OE
ffT -roP frwP 5' W 1t>E +/-lt7 "f.:!;o 77 DM,
,
-
11/03/2004 16:36 2535390514
11/03/2004 16: 56 4258275424 .
SOUNDBUILT HOMES
AES!
Associated Earth Sciences. Inc:.
Tecbnncal Memo:randUJ1m
Date: November 3, 2004
To:
From:
Kurt Wilson
SBI Developing, LLC
2S3·.S39-05l4
Melissa Magnuson. P.E.
Bru~ Slyton, P.E.
Subject: Off-Site Retaining Wall
Project NIIJlle: Evendell Plat
Project No: KE04323A
PAGE 02 .
PAGE lill/02
Associated Earth Sciences, Inc. (AESl) bas prepared this memorandum to prO'o'Jde geotechnical
recommendations for construction oft.he proposed cast-in-place retaining wall located on the o.orth
side of SE 136"' Street. The wall will be constructed as part ofrigh1-of-way improvements and will
StJpport the neighboring property· to the north of the east-west trending wall. Based on plans
prepared by Core Design, the retained heights will range from 2 feet at the ea..<rt end of the wall to 10
fe<et near the west end of the wall.
AESI completed a report for the Evendell Plat titled "Subsurface Exploration and PreJimiriary
Geotechnical Enginee,:ing Report-Evendell Plat" dated November 16, 2001. The wils encountered
during the field study for this repo;t consfati:d ofV ashon lodgement till. It is anticipated, but should
be confinned by AESI during oonstructi.on, that the subject cast-in-place retaining wall location will
also comprised of this same aoil. TiJJ typically has high strength and low compressibility
characteristics. As such, the temporary cut slopes necessa:y for1he cast-in-place wall can be planned
for 4 vertical feet transi.tioning to a 'hH: IV (Hi:rrizontal:Vertical) slope.
Horizont11,1ly backfilled walls that are free to yield laterally at least 0.1 percent of their height may be
designed using an equivalent fluid equal to 3 5 pounds per cubic: foot (pcf). Fully restrain.ad,
horizontally backfilled rigid walls that cannot yield should be designed for an equivalent fluid of 55
pcf. Surcharges due to traffic, foundations, or sloping ground muet be added t'O the above values.
The lateral pressures presented above are based on tbe conditions ofa uniform backfill consisting of
on-site soils .compacted to 90 percent of ASTM:D 1557. A higher degree of compaction ls not
recommended, !IS this will increase the pressure acting on the wall. A. J.ower compaction may result
in settlement behind the wall. Thus, the compaction level is critical and must be tested by our firm
during placement. ·
1
-
11/03/2004 15:35 2535390514
:1/03/2004 16:56 4258275424
SOUNDBUILT HOMES
AES!
PAGE 03
PAGE 02/02
Footing drains should be provided for all retaining walls. It is imperative that proper drainage be
provided so that hydrostatic pressw:es do not develop against the wall. A minimum 1-foot-wide
washed gravel blanket drain should be placed behind the wall. This wall drainage ~ould connect
with the per.imeh:r footing drai.n and e,i:tend to within l foot of the ground surface.
Lateral loads can be resi.sted by friction between the foundation and the natural glacial soils or
·supporting structural fill soils, or by passive earth pressure acting on the bmied ponions of the
foundations and keyways. The foundations must be backfilled with structural fill compacted to at
least 9S percent of the maximum dry density to achieve the passive resistance provided below. We
recommend the following design parameters:
o Passive equivalent fluid = 300 pcf
o Coefficient of friction = 0.30
The above values are allowable and include a safety facto, of at least 1.5.
If you should have any questions, or require further assistance, please do not hesitate to call.
2
11/09/2004 17:19 2535390514 SOUNDBUILT HOMES PAGE 02
Issaquah School District Ne. 411
565 NW Holly Street • Issa ueh, WA 98027.-2899 • Phone 425 837. 7000
Janet N. Barry, Ed. D.
November 7, 2004
Kurt WIison, Land Acquisition Manager
SBI Developing, LLC
Box73790
Puyallup, WA 98373
RE: Pedestrian Access to Liberty High School
Dear Kurt:
The proposed pedestrian connection Via Tract "A' in the existing Liberty Lane
subdivision has been reviewed and approved. ·
This should provide the necessary authorization reques1ed by King County and aUow
your design work to proceed. Let me know If you need anything else to continue the
process.
If you need access to the school site to take measurements, gather information etc.
contact the school office where you will need to signs in and sign-out. Please forward
design drawings to me as they are developed for review.and approval.
SI
S Crawford
D1 ctor of Capital Projects
Board of Dlraclol'9
Constance L. Fletcher• Lany W. Ishmael • Mark Wamer • Mlctiael Winkler• Jan Woldaalh
Superintendent
)
..
7. OTHER PERMITS:
Permits from City of Renton and Water District 90 are required for the water and sewer
design.
1
: I I I ' i I J ' I !
--·~ __ :_i_ __ ;r --~ _1 -~--.. ~ -~ -~ _ ~ -l . ;_ _ ! _ ·r-L _ ; . , ' j I ' I r ' i ' ! 1 , f j ! \ : I j I , ! ! --·r·~---1---i---l .L. --~ ·1 ·•·· · · ....... i ·i· r
. I .L ~---i--·i--ewv• el ~-: -~~!-ui -!~-:··t .. :
I ! l I . ' ) I I ' ' ' ' -·+ -;··•·! ---,-.J .. --. !9~-I.,~ I.,,• ' ,.,~, ~ ~ '"'" 'I •... :-... j
· , , I 1 f ' . i , ! ~ . 1
"6iE \~/ti_/6f !WALL
:Kr\\(<::, Go.····
____ _j_ •
. . . , I .
:~ ; . . . ' ' , ·,·
---r· -~~@'t)·r"""\<tt·to:~-jo \''' /"•At· ·04 --L--·
.... ~1.-... ~--~--\':'-!, L ~ v..r~ ~~~ .~ . __ ~ C J,
-·---1 ...
' '
--1.. . ..... -! -·
i..
Miles Consulting
PO Box· 40143
Bellevue, WA 98015
. '
profec;t
loclllon
· c;11tnt
fFUECIE~VIED
ncr f Ii 2004 ·
., ..
KING COUNTY
LAND USE SERVICES
. } . ; ..
checked
date
·--\ ·-
··(
. Design loads are for the actual dead loads,. soils loads as
determined from the Civil Engineering·Plans and an HS20
vehicle AASHTO distributed.
Construction should be in acciordance with latest edition of
UBC and inspection should include;
'
1. All concrete work phases and strength. .
2. Provide special.inspection by Geotechnical Engineer
confirming assumed soils parameters.
3. Any fill placed below footings or slab has
sufficient ooll)paotion to.at least 95% ASTM D-1557.
Prior to excavation the Contractor will determine if any·
underground utilities exist in the area of work.
-foundations have. been desi·gnE!d based on;
Allowable Bearing '2.~00 PSF I // ·
Active Earth Pressure . ~ PCF (Ret·aining)
Active Earth Pressure 5:0 ;PcF (R4;1s_tra.lned)
Passive Earth Pressure 300' PCF ·
Soil Wt 120 PCF Coef. of Friction .4 (SF= 1.5)
. . .
Foundation exoavat.ion · shall extend into undisturbed soil.
If.filling shoul(J occur it will. be place to 95% compaction
and shall be.inspected for adequacy per ASTM D-1557.
Back-filling of the walls shall be accomplished using a free
draining material. When required, a· sub-drain should be
installed to carry away any local ground wat'er which might
accumulate. in th.e back-fill or pond· behind wall. Raise fill
evenly around tank to prevent overlo~ding walls at any
specific .point. ·
Concrete construction· for oast-in~plaoe ·concrete shall. be.
inspected and tested. The concrete sh~ll attain a·minimum
28 day strength of fa'= 3000 psi. Use of add mixtures
shall have OWner approval. (Strength required to back-fill.)
Provide forms ·and falsework as ·required for construction.
Reinforcing steel shall.conform to ASTM A..;615-68, Grade 60.
Lap splices shall be a minimum of 30 bar diameters.
Fy= 60,000 psi. All horizontal reinforcing bar·s in walls
shall be lapped around the corners.. The reinforcing s_hall
be protected by minimum cover as detailed on the plans, or
when not detailed per UBC Concrete Construction. ·
I
. TO[ 469.2 •'
·-'-' l-~-
·--, 'L ····-. ;.,-
·~~:-.
J
-/,--.;: .. k-,,,5,
·-~-<:.!·-·::c·j'" 1. ··. -. ~-
'
STA. 0+5dF.G. TOP 479.6 , , · . . TOE 469.J'
STA. 1 +odfF. c. TOR 484. o -. · TOE 471''
CONCR(lE RETAINING
WALL, BY. 0 llj_f_RS \
"-'<.fJVtlnt•'71...'\.IV VL.I '-''-'
\ \ STA. L. ., ('C. TOP 490. 0
f ' \[OE 480.2
-• ' •• -• --1 ---.
END CONCRElE WALL
BEGIN ROCKERY
$TA. 2+50 F.G. TOP 492.0
TOP 492.5
F. G. TOE 1485. 5,
..._ TOE 483.2 .
v;~ (,._,{;": :._, 1_;. loP. 494.0
' --• 0 ''"'' f.i,T-OE 488.0
1------1
.. --,;_ -~ --_-_-\o;::; ·~qJ·,___ __
J~ -I 11'
--+L._'_c_ ----'=---~-t--
\
--~--.-"···---~~
---'··---·.·.\·----·--... __ 'e:. ·n:
26' R!GHT-'OF"cHWY"" -, "'· )· ·_ ·--.--sc:c-
·<iJ£DICA TTON ·--.\ ·& \ \ '·-'• . "''" _-·~-
!o{)Rl~WA Y PER
-,-REMOflt E_ X!ST. KEYST(}t(E_ \,\\'--... , _
5
"-...._
·:WALL W(THIN PROPOSF/} \ .\ ~Ji , _ '---'~---!
\ \: ROAD J-,S/W. . i: i \ ' I
--.,_ 5
-,--·==----~
Rt
TC
6~
I
Dl
--·----· ,~
-. 6'l0.f!C '{M!t/.) CEMfNT CONCRET(_B(:f P \ __ ,;: ,;~ ~1! : _ , --,s6 r•
·W/ !2."1-.,SLOPE (MAX)fER p '. , a:: __ f F. • 1 -4--..__,=--,.Ll\,I~~ '£'"·-,,.-'--'-II
K.C.R.S owe NO._ 4-41_04 ---~Ii, · --. ~ -~,/ Ii
\;)-i ;, :" __ ",., •, :. -' -. --'J___ 481. . --· ··· \ ., -._ , ..._ · 488.51 A
\I',.. ,'. t. -. '~ . -.,.., :.• 'I:"..,;,
i),. ,., .. ,.. ' " ·--s -STA -0+00 -''-, ' ·, _ _ __ ' -"••
--/NrX f.--136TH ,A VE. Sf -'< .. '. ~--,-' .. ·-, ,,J.L,j-'c-. --\ .i SE(SHEE{ C3.~ FOR ',
,--· V'):. ',,.. _, '
• -i' --", , 5£ '136th ST., '•. \, -· i -\_~ I ~ ' f \ CHANNEflZA TION AND f : . ,L '
I '' '· <!;(,-~' \ !Lf-UMINAlfON PL4_N \ I . i 1, \.. i'/NSTALL .. ______
, -': _\ ) >-. \ .. FOf?.. STREET !MPR~VEMENTS , ' \ ··cx. TH!GK{NED EDGE -, •.
-1--..._._ '! '1 )!';':"/.,-£_ --.____ ', .: .--': _ \ '· '<t( ENEJ .• OF TRACT -••.•
\ ' ~: :-!,;;_ ', ·:·1~;-' -,;-, . -., ',· ._..,__. .\ "' ·---.. ··-.
"' \ I,:. ~-~"-;,' -'· ' • \ BOUNDARY LINf_ ADJ/./.,STME't{T .,_ ·--,. "-,,__ ----. -. -·, •• ~<, __ , -., · NO.', L03L0013 -.___ ·-' '··--. 2-c:.Fl_Xff!::-! 3-REl.f.OVABLE --..__
's)1(· , _ _ t \ (AFN. 200~0723~~00d2) __ '·,, ..._ ._BOIJ:Af?DS P(J!___ KCRS-0.l!C: NO.
1i , , ·,, _ "/ii_ , -~, -; \..,,:,._ '· -• 5-013 ·-"'-y -
; !\ • <;f ·, \ ' ' ~''"' ',". '' .:", ~· ' '
..-· . . r' , -, "'-..... ·, ~ ...._ \.:: t, \ ', ' '·,___ '-, . '--..... ,..... .................. . '--........ ~ ' --~,._
• \. I " \ '-... ,...._' -....,, "' :..._, "', '., "-.., " ~-·-, '• '· ' ·--. :' ', --,, ', '"' .... . -:,_ ' ' ' ....... . ...... _ ,,_ '•,t,
1-...__
·,., ----' L
5 --F.. ---I
TRACT cJ.'5
i:Jas·oo'o"'
~
--. .Jl]-5 __
' .-: \\!
·----
··-.°?',.Yet.
•. --....
----1_":J.. ___ _
--;NS[ALL
THICKEN/
AT END
Sl
-"sj
tt.l) \'t.rl.l Q ft, LC
' \<. \ V"y '\ (. c.:>•
~~ \ "?<c "C' -S, ~ Leo C::lt ~v'fl. ..S. fc...
'
~ll.~
~c.. -= ~ ~ ~\ ~'\AT l c{ C:. I 1)t2.tA I Al G't0
?c,., ---S° 0 t't=t ~~~,0A,1A.,~O
q :: 300}'~
~(~Ga. 2'5'DO TD ~~ f~ •
17 *-~ \'?~. ?r.
"6/LW\. '7 rt,'\"" /i<-/ 11.J l lU 6,. VJ~ v '-'
--(t><" -Zo\'£-
~P-..
D +'3-5 <\13' 0 4(oQ,c.., ~,8'.
o-+46 417. o -4 <c,O,. 4 1.~
+-s"o 4'1'1, o 4(a9.7 q.~
\._ + 00 -raio .:.I 7!J,€f rmc'.o
\ tt:;o ~ e,g.c, '9"7~o l\.o
~+-00 cle;,o,o ct&:>.?'.. q1B
'Z I-~o <f1~.o .Ys~.::: a.B
3-1-oo c../9z,£" 487.? "7.0
,1/
Wvi-l-;(_ o~ Po.~R,~ · · l ( ~~'
I
l "Z.
i;O~~·
NoN
'I '12.A-t== ~ l 7 \.
"' ~~1P(
•• \0
C. I
<)UAAL~
4<:\0
\ l _,;, J $' -:k
)~
1 (.,..-;;. ?~1r7 Po"{~,1~
()c.-. ~ '5"o1c1 ~!MJJ(J\5?
f? ~ ?00~
~( N.b ::= 'Z ?C:C) f 7'-.
~f """'?CO
~~ ~) r-\l:::>
() = f1 ~ (,~ = ~~zo
M ~ 'z'?zo(i %) :: \0/:>eD
(v\, "::-1c, oeo ( 1 A) ,:. l 4) ~ \ -z..
i ~ ' -..-,
l.. -::... ~ e::. <.oo.?::oo ';,::;:
tn .A\... L to'' ·
t\ -:. \ L... d ,::. &~
\4... z:: \t.l..t( l'zcoo) c:. z~ z
\ -z._ ( ~ l'E,
~::. 1-.~ ~~ t4.z ~ .4'2.
8 (4.7.'b)
(\') U\ ":. l w~<{i c:.)(10)-:: I""°
~/ ~~~, 40
~l Dl~ ~ ~'JO (14) :=. "3c../~O . -z. .
e~ ~ ~~(~l (~) =(oco
~i~l1iC I NG .4 ( 3'114) ft::,ro
. . ~ I '] Ci:, (i, -1-~ (:)O .
--::: / C,~4, <
'3 "/'J; 0
,,4-(; () 10~ fJ
~ "Z I
1"00 't
e f t:. ~e;x:.,fFr
~': l 'Z~( ~) -
. -:: "Z4 t:o~
-+~""!. '7 l '71' ' I\J~
:: l~c'o(o4 "'l.400-;;.
8'
td'
ti,;-e ;~''
Hi(;.(! IZ"
I
,
\-\~ \Q J "-~
l..<..'.)(-\--U... le:, -:. \ "1..
9-:: ,z 4" "ZO
,· ~ ~ \ • 4 ( -'Z..;'~~ ~ ~~~: ~OCX)
8. ESC ANALYSIS AND DESIGN:
Design of the erosion/sedimentation control plan was completed in conformance with
Core Requirement #5 per the 1998 KCSWDM. Compliance with the 7 minimum
requirements are summarized below.
I. Clearing Limits: Clearing limits have been delineated on sheet C2.0I of the civil
plans. The clearing limits extend only to those areas that will be disturbed during
construction of the subject project.
2. Cover Measures: The Construction Sequence listed on sheet C2.0I of the civil
plans specify specific times at which temporary and permanent cover measures
will be installed.
3. Perimeter Protection: Per sheet C2.01 of the civil plans, silt fence will be used for
perimeter protection. Silt fence will be installed along the perimeters of those
areas that will be receiving silt-laden runoff.
4. Traffic Area Stabilization: A construction entrance will be installed. See sheets
C2.0I and C2.31 for location of construction entrance and detail.
5. Sediment Retention: The wetpond will be used for sediment retention. Sediment
retention will be designed per the 1998 KCSWDM Appendix D.
Surface Area:
East Basin Q2 (posteast.tsf) = 1.94 cfs
SA= 2080 sf/cfs * Q2
SA= 2080 sf/cfs * 1.94 cfs = 4,035 SF
Available Wetpond SA (Elev. 458.5) = 120'x35'=4,200 SF> 4,035 SF=> OK
Riser Diameter:
The riser diameter will be 18".
Emergency Overflow Spillway:
The emergency overflow spillway as designed in Section 4B of this report will be
installed as part of the erosion/sedimentation ponds.
Dewatering Orifice:
A,= A,(2h)°5/(0.6*3600Tg05)
D = 24(A,,/3.14)05
Pond A,= 4,200(2*2.0)05/(0.6*3600*24*32.2°5 ) = 0.029 SF
Pond D = 24(0.029/3.14)05 = 2.31" Use 2-3/8"
6. Surface Water Control: Interceptor swales will be used to direct all sediment-
laden runoff to the sediment retention facility. See sheets C2.0l and C2.31 for
location of swales and details.
7. Dust Control: A note on sheet C2.0l addresses the procedure for dust control
should soils become too dry.
9. BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF
COVENANT:
The bond quantities worksheet and facility summaries will be completed upon
engineering plan approval. A Declaration of Covenant will be completed prior to
engineering plan approval.
Site Improvement Bond Quantity Worksheet
@ King County
Department of Development & Environmental Services
900 Oakesdale Avenue Southwest
Renton, Washington 98055-1219
206-296-6600 TTY 206-296-7217
Project Name: Plat of Evendell
Location: SE 136th St & 157th Ave SE
Clearing greater than or equal to 5,000 board feet of timber?
X yes
If yes,
Forest Practice Perm~ Number:
(RCW76.09)
Page 1 of 9
no
L04GF042
For alternate formats, call 206-296-6600.
Date: 10-Nov-04
Project No.: t...ol Po-v tb
Activity No.: LrJ I f"rJrJ 16Afl93RE838
Lo4-SRo2.f
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
R,uffe"'~dd r t2ffY~
~~7
11 /3o/ZD01
040098QW03.xls Check out the DDES Web site at www.metrokc.gov/ddes
Unit prices updated: 02/12/02
Version: 04/22/02
Report Date: 11/30/2004
Site Improvement Bond Quantity Worksheet
EROSiON/SEDIMENT coNXROlli} {
Backfill & compaction-embankment
Check dams, 4" minus rock
Crushed surfacing 1 1/4" minus
Ditching
Excavation-bulk
Fence, silt
Fence, Temporary (NGPE)
Hydroseeding
Jute Mesh
Mulch, by hand, straw, 3" deep
Mulch, by machine, straw, 2" deep
Piping, temporary, CPP, 6"
Piping, temporary, CPP, 8"
Piping, temporary, CPP, 12"
Plastic covering, 6mm thick, sandbagged
Rip Rap, machine placed; slopes
Rock Construction Entrance, 50'x15'x1'
Rock Construction Entrance, 100'x15'x1'
Sediment pond riser assembly
Sediment trap, 5' high berm
Sed. trap, 5' high, riprapped spillway berm section
Seeding, by hand
Sodding, 1" deep, level ground
Sodding, 1" deep, sloped ground
TESC Supervisor
Water truck, dust control
WRJT:E4N4TEMS1!!M{seeRii9iiir9I J r '
Concrete Vault
Page 2 of 9
04009BQW03.xls
ESC-1
ESC-2 SWDM 54.6.3
ESC-3 WSDOT 9-03.9(3)
ESC-4
ESC-5
ESC-6 SWDM 54. 3.1
ESC-7
ESC-8 SWDM 5.4.2.4
ESC-9 SWDM 5.4.2.2
ESC-10 SWDM 54.2.1
ESC-11 SWDM 5.4.2.1
ESC-12
ESC-13
ESC-14
ESC-15 SWDM 5.4.2.3
ESC-16 WSDOT 9-13.1(2)
ESC-17 SWDM 5.44.1
ESC-18 SWDM 5.4.4.1
ESC-19 SWDM54.5.2
ESC-20 SWDM 5.4.5.1
ESC-21 SWDM 54.5.1
ESC-22 SWDM 5.4.2.4
ESC-23 SWDM 5.4.2.5
ESC-24 SWDM 5.4.2.5
ESC-25
ESC-26 SWDM 5.4.7
I
$ 5.62 CY 1 150001
$ 67.51 Each I 161
$ 85.45 CY
$ 808 CY 275
$ 1.50 CY 15000
$ 1.38 LF 2400
$ 1.38 LF
$ 0.59 SY
$ 1.45 SY
$ 2.01 SY
$ 0.53 SY I 500001
$ 10.70 LF
$ 16.10 LF
$ 20.70 LF I 2001
$ 2.30 SY
$ 39.08 CY I 51
$ 1,464.34 Each
$ 2,928.68 Each 1 11
$ 1,949.38 Each I 11
$ 17.91 LF
$ 68.54 LF
$ 0.51 SY
$ 6.03 SY
$ 7.45 SY
$ 74.75 HR I 101
$
I $120.000.00 I Each I 11
ESC SUBTOTAL:.
30% CONTINGENCY & MOBILIZATION:
ESCTOTAL:
COLUMN:
Check out the DDES Web site at www.metrokc.gov/ddes
11
11
1
1
1
1
1 I
11
11
11
11
1
1 I
84300
1080
2222
22500
3312
26500
4140
195
29291
19491
120000
$ 270,852.62
$ 81,255.79
$ 352,108.41
A
Unit prices updated: 02/12/02
Version: 04/22/02
Report Date: 11/30/2004
Site Improvement B d Quantity Worksheet
Backfill & Compaction-embankment GI -1 $ 5.62
Backfill & Compaction-trench GI -2 $ 8.53
Clear/Remove Brush, by hand GI -3 $ 0.36
Clearing/Grubbing/Tree Removal Gl-4 $ 8,876.16
Excavation -bulk GI -5 $ 1.50
Excavation -Trench Gl-6 $ 4.06
Fencing, cedar, 6' high GI -7 $ 18.55
Fencing, chain link, vinyl coated, 6' hig GI -8 $ 13.44
Fencing, chain link, gate, vinyl coated, 2 Gl-9 $ 1,271.81
Fencing, split rail, 3' high GI -1 $ 12.12
Fill & compact -common barrow GI -11 $ 22.57
Fill & compact -gravel base GI -1, $ 25.48
Fill & compact -screened topsoil GI -11 $ 37.85
Gabion, 12" deep, stone filled mesh GI -14 $ 54.31
Gabion, 18" deep, stone filled mesh GI-H $ 74.85
Gabion, 36" deep, stone filled mesh GI -1E $ 132.48
Grading, fine, by hand GI -1 $ 2.02
Grading, fine, with grader GI -1! $ 0.95
Monuments, 3' long GI-H $ 135.13
Sensitive Areas Sign GI -20 $ 2.88
Sodding, 1" deep, sloped ground GI -21 $ 7.46
Surveying, line & grade GI ·2~ $ 788.26
Surveying, lot location/lines GI -2, $ 1,556.64
Traffic control crew ( 2 flaggers) GI -24 $ 85.18
Trail, 4" chipped wood GI -2~ $ 7.59
Trail, 4" crushed cinder GI -2E $ 8.33
Trail, 4" top course GI -2 $ 8.19
Wall, retaining, concrete GI -2 $ 44.16
Wall, rockery GI -21 $ 9.49
Page3of9 SUBTOTAL
.. KCC 27 A authorizes only one bond reduction.
04009BQW03.xls
CY I I I 20001 11,240.001 150001
CY j 35oJ. 2,985.5oj 6001 5,118 oq]_ 105qt
SY
Acre 2 17,752.32 2 17,752.321 9j
CY 5750 8,625.001
CY 400 1,624.00 650 2,639.ool 11501
LF
LF
Each
LF
CY
CY
CY
SY
SY
SY
SY
SY
Each I 51 675.651 121 1,621.56
Each
SY
Day I i I 788.261 21 1,576.521 11
Acre
HR
SY
SY
SY
SF T 2,sooT 11 o,400.ooT
SF 11251 10,676.25
144,901.98 -~572.40
Check out the DDES Web site at www_metrokc_qovlddes
84,300.00
-~956.50
79,885.44
4,669.00
788.26
178,599.20
Unit prices updated: 02/12/02
Version: 4/22/02
Report Date: 11/30/2004
Site Improvement B
' .
.d Quantity Worksheet
·····•tt{fi@t{!'.®Ji§
ROAOIMPROVEMENt\t·••J••••···········
AC Grinding, 4' wide machine < 1 OOOs
AC Grindirig, 4' wide machine 1000-200f RI -2 $ 5.75 SY
AC Grinding, 4' wide machine > 2000s RI -3 $ 1.38 SY
AC Removal/Disposal/Repair RI -4 $ 41.14 SY
Barricade, type I RI -5 $ 30.03 LF
Barricade, type Ill ( Permanent) RI -6 $ 45.05 LF
Curb & Gutter, rolled RI -7 $ 13.27 LF I I I 3300\ 43,791.00
Curb & Gutter, vertical RI -8 $ 9.69 LF l 25001 24,225.ool
Curb and Gutter, demolition and dispos RI -9 $ 13.58 LF
Curb, extruded asphalt RI -10 $ 2.44 LF
RI -11 $ 2.56 LF
RI -1~ $ 1.85 LF
Sawcut, concrete, oer 1" death Rl-13 $ 1.69 LF
Sealant, asphalt RI -14 $ 0.99 LF
Shoulder, AC, ( see AC road unit price 1'1-H $ . SY
Shoulder, gravel, 4" thick RI -1€ $ 7.53 SY
Sidewalk, 4" thick RI -1i $ 30.52 SY I 11001 33,572.001 9251 2!3,231.00
Sidewalk, 4" thick, demolition and disnns RI -1: $ 27.73 SY
Sidewalk, 5" thick Rl-19 $ 34.94 SY
Sidewalk, 5" thick, demolition and dispos RI -20 $ 34.65 SY
Sign, handiCap RI -21 $ 85.28 Each
Striping, per stall RI -2 $ 5.82 Each
Striping, thermoplastic, ( for crosswalk RI -2: $ 2.38 SF I 1201 285.60\ I I 50\
Striping, 4" reflectorized line RI -24 $ 0.25 LF I 5600\ 1,400.00
Page4of9 SUBTOTAL 59,482.60 72,022.00
*KCC 27 A authorizes only one bond reduction.
04009BOW03.xls Check out the ODES Web site at www.metrokc.gov/cldes
119.00
119.00
Unit prices updated: 02/12/02
Version: 4/22/02
Report Date: 11/30/2004
Site Improvement B ,d Quantity Worksheet
For KCRS '93, (additional 2.5" base) add RS -1 $ 3.60
AC Overlay, 1.5" AC RS -2 $ 7.39
AC Overlay, 2" AC RS-3 $ 8.75
AC Raad, 2", 4" rock, First 2500 SY RS-4 $ 17.24
AC Road, 2", 4" rock, Oty. over 2500S RS-5 $ 13.36
AC Road, 3", 4" rock, First 2500 SY RS-6 $ 19.69
AC Road, 3", 4 .. rock, Qty. over 2500 S !RS -7 $ 15.81
AC Road, 5 .. , First 2500 SY RS-8 $ 14.57
AC Road, 5", Qty. Over 2500 SY RS-9 $ 13.94
AC Road, 6", First 2500 SY RS -1( $ 16.76
AC Road, 6", Qty. Over 2500 SY RS -1 1 $ 16.12
Asphalt Treated Base, 4" thick <S-1 $ 9.21
Gravel Road, 4" rock, First 2500 SY ,5 .1 $ 11.41
Gravel Road, 4" rock, Qty. over 2500 S RS-1• $ 7.53
PCC Road, 5", no base, over 2500 SY RS-11 $ 21.51
PCC Road, 6", no base, over 2500 SY RS-11 $ 21.87
Thickened Edge RS -1· $ 6.89
Page5of9 SUBTOTAL
"KCC 27 A authorizes only one bond reduction.
04009BQW03.xls
I1il11111I•••••
SY I 35001 12,600.001 27701 9,972.00\ 14501
SY
SY
SY 25001 43,100.001 1450\
SY 27oJ. __ 3,607.201
SY 2500 49,225.00
SY 1000 15,810.00
SY
SY
SY
SY
SY
SY
SY
SY
SY
LF t t T T 1 6401
77,635.00 -~.679.20
Check out the DOES Web site atwww.metrokc.gov/ddes
5,220.00
24,998.00
4,409.soi
34,627.60
Unit prices updated: 02/12/02
Version: 4/22/02
Report Date: 11/30/2004
Site Improvement B .d Quantity Worksheet
bMlNAGe 1¢\:i!Jiili~~liii ili~i;iii; ifa¥: M?~i~~i4~ii i iit;B&&~Ui&J! i;w~&.~i~;;:;;;;;;;;;;;.;~;;;~~;;;;;;;;;;;wlt\;id~£;;;;~ J;;;;;;;;; ihi1ii~;,;;;;i
AccessRoad,R/D .... J D-1 J $ 16.74 J SY J I I J I J J I
Bollards -removable I D -3 I $ 452.34 I Each
481.481 I I 452.34
Bollards -fixed I D -2 I $ 240.74 I Each I 2
* (CBs include frame and lid)
257.64 CBTypel ID-41$1,r-Each 15,091.68 22 27,668.08
CB Type IL D-5 $ 1,433.59 Each
CB Type II, 48" diameter D-6 $ 2,033.57 Each 8 16,268.56 9 18,302.13
for additional de.e_th over 4' D-7 $ 436.52 FT 29 12,659.08 9 3,928.68
CB Type II, 54" diameter D-8 $ 2,192.64 Each
for additionat de_e_th over 4' D-9 $ 486.53 FT
CB Type II, 60" diameter D-10 $ 2,351.52 Each 1 2,351.52'
for additional depth over 4' D -11 $ 536.54 FT 536.54
-D-12 $ 3,212.64 Each CB Type_J_L_ 72" diameter
-D-13 $ 692.21 FT for additional de.e_th over 4'
1,098.27 -, D -14 $ 366.09 Each
D-15 $ 130.55 Each
Throu~h-curb Inlet Framework (Add)
Cleanout, PVC, 4"
3
' Cleanout.!. PVC, 6" D-16 $ 174.90 Each
Cleanout, PVC, 8" D-17 $ 224.19 Each
Culvert. PVC, 4" D-18 $ 8.64 LF
Culvert, PV9, 6" D-19 $ 12.60 LF
Culvert, PV_C, 8" D-20 $ 13.33 LF
Culvert, PVC, 12" D-21 $ 21.77 LF
Culvert, CMP, 8" D-22 $ 17.25 LF
Culvert! CMP, 12" D-23 $ 26.45 LF
Culvert,~~£'! 15" D-24 $ 32.73 LF
Culvert, CMP, 18" D-25 $ 37.74 LF
Culvert, C_~P ~ 24" D-26 $ 53.33 LF
Culvert, CMP, 30" D -27 $ 71.45 LF
Culvert, C~~. 36" D -28 $ 112.11 LF
Culvert, CMP, 48" D -29 $ 140.83 LF
Culvert! CMP, 60" D-30 $ 235.45 LF
Culvert, CMP, 72" D-31 $ 302.58 LF
Page 6 of9 SUBTOTAL 46,587.95 52,250.41
*KCC 27 A authorizes only one bond reduction.
04009BOW03.xls Check out the DOES Web site at www.metrokc.gov/ddes
2
2
11
3
17
53
481.48
904.68
13,834.04
6,100.71
7,420.84
2,351.52
9,269.70
40,362.97
Unit prices updated: 02/12/02
Version: 4/22/02
Report Date: 11/30/2004
Site Improvement B .d Quantity Worksheet
Culvert, Concrete, 8" D • 32 $ 21.02
Culvert, Concrete, 12" D-33 $ 30.05
Culvert, Concrete, 15" D -34 $ 37.34
Culvert, Concrete, 18" D -35 $ 44.51
Culvert, Concrete, 24" D -36 $ 61.07
Culvert, Concrete, 30" D -37 $ 104.18
Culvert, Concrete, 36" D -38 $ 137.63
Culvert, Concrete, 42" D-39 $ 158.42
Culvert, Concrete, 48" D -40 $ 175.94
Culvert, CPP, 6" D -41 $ 10.70
Culvert, CPP, 8" D-42 $ 16.10
Culvert, CPP, 12" D -43 $ 20.70
Culvert, CPP, 15" D-44 $ 23.00
Culvert, CPP, 18" D-45 $ 27.60
Culvert, CPP, 24" D-46 $ 36.80
Culvert, CPP, 30" D-47 $ 48.30
Culvert, CPP, 36" D-48 $ 55.20
Ditching D-49 $ 8.08
Flow Dispersal Trench (1,436 base+) D -50 $ 25.99
French Drain (3' depth) D • 51 $ 22.60
Geotextile, laid in trench, polvpropylem D -52 $ 2.40
Infiltration pond testing D -53 $ 74.75
Mid.tank Access Riser, 48" dia, .6' dee D-54 $ 1,605.40
Pond Overflow Spillway D-55 $ 14.01
Restrictor/Oil Separator, 12" D • 56 $ 1,045.19
Restrictor/Oil Separator, 15" D -57 $ 1,095.56
Restrictor/Oil Separator, 18" D -58 $ 1,146.16
Riprap, placed D • 59 $ 39.08
Tank End Reducer (36" diameter) D-60 $ 1,000.50
Trash Rack, 12" D-61 $ 211.97
1Trash Rack, 15" D-62 $ 237.27
Trash Rack, 18" D -63 $ 268.89
[Trash Rack, 21" D-64 $ 306.84
Page 7 of9 SUBTOTAL
·KCC 27A authorizes only one bond reduction.
04009BQW03.xls
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF ·1 51a]
LF I 501
LF
LF I 5891
LF
LF
CY I 501
LF
LF
SY
HR
Each
SY
Each
Each
Each
CY
Each
Each
Each
Each
Each
Jrnrra1t~mgmt~1f]JI1It ...... . ••••·t•·•·•fg~!ml/mYm\iimlf I••• ····•·ttiraiiiiigl/,fi.icmt;_.,, > •
=?:94~6W+
10722.sl 2181 45146.7
11501 73 1679
21675.2
404
33951.8 46825.7
Check out the DOES Web site atwww.metrokc.gov/ddes
2700
935
165
50
28890
19354.5
4554
700.5
1146.16
268.89
54914.05
Unit prices updated• 02/12/02
Version: 4/22/02
Report Date: 11/30/2004
Site Improvement B .d Quantity Worksheet
No.
2" AC, 2" top course rock & 4" borrow PL -1 $ 15.84 SY
2" AC, 1.5" top course & 2.5" base cou PL-2 $ 17.24 SY
4" select borrow PL -3 $ 4.55 SY
1.5" top course rock & 2.5" base coursE PL -4 $ 11.41 SY
rteJWJ:ti:MS@t•••' n nr t
l(Such as detention/water quality vaults. No.
!School Walkway WI -1 Each
Concrete Sidewalk Wl-2 $ 30.52 SY
Grading Wl-3 $ 5,000.00 LS
Concrete Stairs Wl-4 $ 5,000.00 LS
Metal Handrail Wl-5 $ 50.00 FT
Wl-6
Wl-7
Wl-8
Wl-9
Wl-10
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):
30% CONTINGENCY & MOBILIZATION:
GRANDTOTAL:
COLUMN:
Page 8 of9
I 140 4272.8 500 15,260.00'
5,000.00
4,272.80 20,260.00
366,832.13 v 296,609.71 ,-
110,049.64 88,982.91
476,881.77 385,592.62 _,,
B C
*KCC 27 A authorizes only one bond reduction.
04009BQW03.xls Check out the ODES Web site at www.metrokc.gov/ddes
50
60
1,526.00
5,000.00
3,000.00
9,526.00
318,148.82-/
95,444.65
413,593.47 ,/
D E
Unit prices updated: 02/12/02
Version: 4/22/02
Report Date: 11/30/2004
Site Improvement Bond Quantity Worksheet
Original bond computations prepared by:
Name: Plat of Evendell Date: 1 O-Nov-04
PE Registration Number: 33713 Tel.#: 425-885-7877
Firm Name:
Address:
Core Desi_g_n, Inc.
14711 NE 29th Place, Suite #101 Project No: LO IF OOib
ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND·
AMOUNT
Stabilization/Erosion Sediment Control (ESC} (A) $ 352.108.4
Existing Right-of-Way Improvements · (8) $ 476,881.8
Future Public Road Improvements & Drainage Facilities (C) $ 385,592.6
Private Improvements (D) $ 413,593.5
Calculated Quantity Completed
Total Right-of Way and/or Site Restoration Bond•r
(First $7,500 of bond· shall be cash.)
(A+B) $ 828,990.2
Performance Bond• Amount (A+B+C+D) =. TOTAL
Reduced Performance Bond* Total***
Maintenance/Defect Bond• Total
(T) $ 1,628,176.3
Minimum bond" amount is $1000.
BOND.AMOUNT
REQUIRED AT RECORDING OR
TEMPORARY OCCUPANCY •••
(E) $
TX 0.30 $ 488,452.9
(T-E) $ 1,628,176.3
Use larger of 1 x30% or { 1-E)
OR
NAME OF PERSON PREPARING BOND• REDUCTION: Date:
* NOTE: The word "bond" as used in this document means any financial guarantee acceptable to King County.
"'* NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
PUBLIC ROAD & DRAINAGE
MAINTENANCE/DEFECT BOND•
(B+C) x
0.25 = $ 215,618.6
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on-and off-site needs to be included.
Quantities shatl reflect worse case scenarios not just minimum requirements. For example, if a salmon id stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilizatior:, costs are computed in this quantity.
-NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
SURETY BOND RIDER NOTE: If a bond rider is used. minimum additional performance bond shall be ! $ 799,186.1 !(C+D)-E
REQUIRED BOND' AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY DOES
Page 9 of 9
04009BQW03.xls
Check out the DDES Web site at www.metrol<c.gov/ddes
Unit prices updated: 02/12/02
Version: 4/22/02
Report Date: 11/30/2004
V
10. OPERATIONS AND MAINTENANCE MANUAL:
A maintenance and operations manual is not required since all drainage facilities will be
public.