Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutExhibit02_P_SitePlan_LUA24-000200_111AirportWay_ApprovedAirport way
160°
EXIST.TREE
26
4 PROJECTDATA
LANDSCAPEDAREAIN 17 PROJECTNAVE EI Muchacho Alegro
ADORESS 111ARAORT WAY,Rerton We o057
PARCEL 3osSERVC€HOST LEGACorteme TAT36
AAT LOT
Mat Orocket210OANERSNAME
34224 Ma e waaszroDININGAREATDNTSNAMAEJsusOrorcooo271ana111AlrportWay,Renton Wa30(1.959 +)/15 -131 Occ 11
LOT UL 1600oM (100%100)
BUROINGrE 1063 x s9)-7%)31
12 21 ASSEMOLYIQINNG sZL 1,5af
T OVERSOEATEYSERVCEAREAwON32PRODOSEOUSEAN0CMcE
REST 13 22 CONSTRUCTION TYYPE NON-RNGỰR
NOCOO
wẠCS142 Accr130uY
tALON3cocs 2s NTEANMBLADNG3ARY15PROPOSEDOUTDOORDININGDISHWASHCOORNGAREA"
KITCHEN(1218s)/I200-7 OcC
or stoac411 34 oN SCATSPROHOED 131 on 1%2/15)
onHERSoaT STR ETCY 7 A 120 dI20o)
WALK-4N
FREEZERMECHOFFICE w TOTAL OCCUPANTS:138
35OUMPSTLR PROPOSED TEMPORARY OUTDOOR DINING2
testco sOFTABLES7 00x o
OFCHUWRSt4264
EXIT DOORS (EMERGENCYEATS)160
B1 &2 00UBLE SW NTRANCEON
OUTDOOR DINING (OPERATION SCHEDULE)
SINGLE yW
OTERSWX65H AKEDOOR
EuTSTillicumStreetSEASON:MAY-SEPTEMBER
AYS.HOURS 11 I.9 PM
OUGONLTRAMLNOOSTANCE 0 lotTWELNEUTDOOSS$et (70%)
SCOPE OF WORK:
SUMMARY
TPE YA(TONAWTIMPROVtMENT,NO NITRE
2 PROPosETOADOIDNMNGTABLESAND14peNG CHus
PARKING REQUIREMENT
/100
SITE PLAN 111 Airport Way,Renton Wa
"EI Muchacho Alegre"Restaurant
(FORREFERANCE ONLY,NOT FOR CONSTRUCTION)
REOUREDPANO1TALLS *STALS(
NGUCN 2HAN
NOTE Da1t,PARNÓWLLE rEMPRAYRUPACLO
NOCAPH04FNISHNGWORKROORCƠVERINGANOCOATING
YPAOPOSOOUTDOORDNNOSCALE:(1/8°=1-0")
CONTACT
ate AacesComonCa oananeh co
Example of barrier/separation materials
Applicant has revised
proposal to 3 tables and 6
chairs
3
6
3
RECEIVED
06/26/2024
bburroughs
PLANNING DIVISION
06/21/2024
bburroughs 07/19/2024
CURRENT PLANNING
EXHIBIT 1EXHIBIT 1