Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutReport 1A 4k
PARTIES OF RECORD
fOOTBALL NORTHWEST PLATFORM Ll
LUA09-134, ECF, SM, SMC
Alan Foltz
Waterfront Construction, Inc.
205 NE Northlake Way ste: #230
Seattle, WA 98105
tel: (206) 548-9800
eml:
Foltz@waterfrontconstruction.com
(contact)
Lance Lopes
Football Northwest LLC
12 Seahawks Way
Renton, WA 98056
(owner / applicant)
Updated: 11/10/09 (Page 1 of 1)
PROJECT DESIGNED DY:
',N,--A,erfrcrt C�rS%rllG�fON r�
TIAs DOCUMENT �; PROPRIETARY PROPERTY 07 WATERFRONT
C2N$IJ IUCIION INC., AND IS NOT :0 RF IISFD, IN WHO[ F OR IN
PART, FOR ANY OTHER PROJECT WITHOUT -HE %NR[T7EN
AUTHORI2ATON OF W'ATERFFfONT CONSTRJCT.ON INC,
T.
fiRtn St - SE FIRM 31
_ Pioneer
u7
a 3 Park a '
a � �
L
- SF ?2f5U� r
ISI P
cf7
d N
C
Clark j
p sE;B.ns Beaty
Pon
=a
r4 'Ml
,A
Vy
-f
LAKE
WASHINGTON
I
IAI
m
1�
a
;i
Baa
SITE
4May Geek
a �
a`
W
3
IN 18,h Si
VICINITY MAP/NO SCALE
LEGAL DESCRIPTION
1/4 SEC: SW 29 -24N -05L
TAXLOT #: 292405 9015
?92405 15 "BAXTER PARCEL NORTH' PENTON
LUA-00-044 LLA RLC NO 20010105900005
WCH IS POP OF SSV 1/4 29-24-05 LY WLY
OF BN RR CO R/W
C'ty Of Ren
Planning Divis,
OCT -
KFNMOR3
LAKE
FORESI
PARK
AJANITA
k
I
RLN UN
AREA MAPIScale:1 3miles
LAT: 1 4 " r+ l EcEp vz o
LONG -- 1122-* t 1' 53"
PURPOSE: TO PROVIDF PLATFORM I IFF
DATUM: C.O.E. 0.0' EST 1919
ADJACENT OWNERS:
�j MISTY COVE CONDCVINIUMS
5021 RIPI_Y LN N
RENTON, WA 98056
i OOFBALL NW
LAKE WAHINGTON BLVD
RENTON, WA. 98G6F,
OL'TBALL NW LLC
REFERENCE #:
12-SLAIIAWKS WAY
RENTON. WA 98056
2924059015
0+-32020.A-1.1
PROPOSED: PROVIDL I RLE STANDINC IULLY
GRATED aLATFORM LIFT.
IN: LAKE WASHINGTON
NEAR: PENTON
COUNTY: KING STATE: WASHINGTON
APPL BY: FOOTBALL NW '-'_C
SHEET: 1 OF: 5 DATE:
PI� O,_G1 CESIGNILD BY
'V'/f' r
dv�;tteE�ror.t��.crlstru�:�lol� Ilia
Tr < OCCJ',IIENT I; PROPRIETARY 'ROPE— o" WATIE ZONT
CCiv STRUCTIC� I�'C:., f,ND 13 NOT TO BE US�q 1N
PLF] FDR AN' OTHER PRO,r.OT v77ti0Uj 'yE. ltiRiITEI%
A'JT-IORIS.TIUN C ---'FA EYRTRO'dT CUNSTRJCT:DN INN .
LXIS TNG
ROCK
H? A K iitiAl)
EXISTING �� q
PIFRV"
S-�
16 4]
.-4.
't
5'-10 1/2"
PL'
/XIS7 ING FULEYZ
GRATED PIER
T EXISTING FULLY
GRATED RAMP
OH'JJL 21.80' - -
EXISTING
SHCREL:NE
PROPOSED
PLATFORM �IFT
35-16 112..
" SITE
CD
MISTY CCVE CCNDOMINII,MS
\ 5021YV18 N
� REN -GN,, WA A '?8056
EXISTING
- \ ''Bo�
BOATHOUSE TO
BE RETAINED \9.
E00TRk, NW /
LAKE WASHINGTON BL VD
RENTON, WA 98056
2924059015
Y �Y�
City of
\ plannin ����f?
�-
oc
BAXTER CLIVE 4
FOOTBALLG NW ��
Z11-
RENTGN,
LAKE WASHINGTDN BLVG'�1,�U1292 WA 9805fi�'�e2924059001 PSL
LAKE WASHINGTON BLVD
RENTCv. WA 98056
EXISTING PLOT PLAN
` 200' i oU' 4c' 0' 200'
1
SCALE 1`200'
�4 n
Ir
OUENDALL TERMINALS REFERENCE :
4503 LAKE WAIIINGTON BLVD APPLICANT: FOOTBALL NW LLC
RENTON, VSA 98056 PROPOSED:PROVIDL FRLL SIANDING FULLY
GRATED PLATFORM UFT,
NEAR/AT: LAKL WA.S#iINGIUN/RLhION
SHEET:2 OF:5
DATE: 10-7-09 DWG!: 97-3202C.A--2.1
G
232'-4"
GHWL 21.80' AT
/ LXISIINc
//____OPLA�
1 2 SHOREINROPOSFD
FORM LIFT
EXISTING FULLY
GRATED PIER-
LXISIING I ULLY
GRATED RAMP
3'-10"
"po.jkc- 1=.9GdFn FY
,i rfl`0h1kc.
-HIS ;i7CJh1Ef,.T IS PROPRIETARY MCFERTY OF '.tiATERFRC%T
CONSTRUC-ON INC., AND IS NO' TO EEUSED. IN WHCLE CR IN
RAR', EGFR ANY O'H;_R PRCJk C:I Wl I HOUT 11-L WRI-TFN
AU71,0R,2A71O14 OF W,%7ERMONT CONSTRLiC-ION INC,
f
EXISTING
DOAISHLD 10 JL
RETAINED
N, bk c„
p8G 4
l �
�ti6 1
Q1_11
1
J 1
1 9,
%PARCEL : 292405 9015
City of
Renton
piannin9 Division /h
1
PLAN VIEW
100' 50' 20' 0' 100' REFERENCE :
z3� APPLICANT:FOOTRALL NW LLC
PROPOSED: PROVIDE FREE STANDING FU' -LY
SCALL: 1"='00' Z GRATED PLATFORM LIFT -
+u+ eJQ NEAR AT: LAKE WASHINGTON/RENTON
SHEET:3 OF:5
DATE: 1C-7-09 JDWG: 07-='20.A-3.'
�kJJEC--� �FSIGRICD i?`-:
r
Wa—z--rfrod i. oi-t1 diori Irc.
�H-5D'JCUMEN PROMETMT FFfp"HIY CF WA-FRFROV-
N4T4JCIiiiN INC„ Ar, --ND- TL' `- LSE . IN N, H.:LE ”. IN
PART, F[? ANY GT -I=F. PH[iJF�' Y+IIHOJ- -i IL NRI-�ch!
A'JrORIi,=T^UN C� ltiA FRF RC'h!' CONSTaJ:;T.UN INC.
P: P,D-EC DES GVE,) 3Y.
`J't��tcrror�t Corlstruc�lon nc
t-s U'>GLa+ENr 15 PMPRIETARY 'PORERTY OF WATE r�oNT
COn,57RIJC10,N INC., AND IS 'JOT TO DE JS -D, IN WH{)
PkHT,FDK 4N- OIHE4 DKV.. -CT YV.7F,OIJT THE YJRITTEN
AJT�I CRIZATION ( 7 VATERVRONT ONSTKUCTIGN INC.
:z
A... -)"T [YQ
�m U? Li0]W0y a>
elfYaf
��
Panning Dlvlsiaa
OC7
LIJUy
neceg
V
yr.r.r
LL
Q
J J
0:2
M wr�
W rV I
V
O Q
O w
J
O _ a
� J n
W o
JEL'7
m Q
D LL.
CL
z
t4
ZONING
P/AaYW MCMUCAL SMVlCES
COR
C4 - 32 TUN R5E W 1/2
- - - - 2-l- MY umttp
Ect� Yl
EXHIBIT I
29 T24N R5E W 1/1
54291
Uu
cc
NOTE;
INFORMATION GATHERER
FROM KING COUNTY
PARCEL VIEWER WEB SITE
200' 100' 40' 0'
200'
SCALE.- 1"=200'
YvulidALL NW LLC ----
REMoVE EXISTING S,E AND REPLACE:
NEW PIER IN NEW LOCATION.
COMWERCLA
,........... .... r
.,..,
` VACANI
COMMERCIAL
.....
(ASE),
COMMERCIAL
(HEAVY INDUSTRIAL) `
...,.,..,..:
f
:
f
NOTE;
INFORMATION GATHERER
FROM KING COUNTY
PARCEL VIEWER WEB SITE
200' 100' 40' 0'
200'
SCALE.- 1"=200'
YvulidALL NW LLC ----
REMoVE EXISTING S,E AND REPLACE:
NEW PIER IN NEW LOCATION.
Y SANITARY SEWERS
+ + P/B/PW TECHMCAL SERVICES
O 04/1/07
" w .3k JLZIAFIN K= 7■ 1/L
N
16 200 400
.1:-teoo
B4
29 T24N ME W 1/2
5429
i
zz`„° 'sfF�F L
azo3 u
oJ m 8ylF y:Z:
o m a °
c� a
C) ti.,„ 13.1j�z o oN
O N
(-),7
z
cr
r
~0 4
z uwi z �s
WCE m / 2y - UIQ ~ a
xOw o
wmm
o
v
CD
M Lo
z oZ Yy �pEpr _II
o Q z i M a
MMM 0
3: FO N f`I
O /✓ Y�
0s
CL
s
EL O_ /
C7 Of
J r
W
w LL Z n j
10
caw mQ
,cc:� f~Zn WU p0LLI �OrnO 'r
Z Z - 4
W _ H J ISVI Z Q
I 1 In LJ � U) z CN
dN
3 w3�CN
_0 =O r QY /
6- 1
I vy� co m
m un
K
O
z
w
y
�5Qa
o n
zc m m
J
a
LJ z 3 Z In
J �
d = Z Q O
UIz mil O1
h�3
W w
SJ a
I s owfl
w
x
¢
II %�
i
M W
z
Y J
� w
Y Q m •y�
2 ONWISI E953 4
is
3111VI S
Q
U
(r]
O
z
Z
m
Ili
Q03
Z
oo�
LO
al
zoo
a
6
w
Quo
wow
J
Ul r
w
F
n
w
o Orn
O
a
L11 r)
�o
%r
O J
¢
o �
O
'�^^-'�
Z N
L
Z
H
W
F--
���
VI iY
w o
o
tW}
a 4
V7
o¢
�f
W S
LL0-z
f
z
a�
N �
z
w
n
o
O
CD
a
3 a7
o¢
z
m
CLO
a
zz
z
E
oo
o
a
flo`"z
z
�x
NQ(=j m
Lu
w
w
w
O
a
z
z
v
a
a (A
o n
zc m m
J
a
LJ z 3 Z In
J �
d = Z Q O
UIz mil O1
h�3
W w
SJ a
I s owfl
w
x
¢
II %�
i
M W
z
Y J
� w
Y Q m •y�
2 ONWISI E953 4
is
3111VI S
Q
U
(r]
O
z
Z
m
Ili
Q03
Z
oo�
LO
al
zoo
a
6
w
Quo
wow
J
Ul r
w
F
°n'
w
o Orn
O
L11 r)
�o
Qo
U
¢
o �
Fy
6
Z N
L
Z
H
O
O
N
U
/��J
V/
o
tW}
a 4
(}-
W
N O
U
w
f
z
a�
N �
3 a7
mJOp
j
o
a
flo`"z
W
�x
NQ(=j m
N J O
Z
O
F -
z
w
M
;E
NO
J
J
J
m
Ili
Q03
Z
�
LO
al
y 0
a
6
w
Quo
>o
0
Ul r
w
F
O
LJ
w
o Orn
O
I.
w W
U
¢
EL
Ir
O
6
o
z o
Z
H
W
Z
Fa N
U M
U
w
4
it
cr
J O
L
W
zm
o�z
wo z
a jr z
wQ
—wz=�
m U W 7 0
0
W4WmC
S140rZ
�
O � O�ac
z P
wC� v1�3
a Lo2�
foo
�L•rz
-v o
Wz�N
7 :2.2=
O O
Ul y d
_V)
U
Q
m
�
g
�
U
z a
a
6
w
z u� m
>o
0
+ ,Zm om
U J m R rn
CL
O
LJ
z w�3 Zz3
0 oa �a
�O
U
H m'�Q
wZ
EL
Ir
�g�
D
o
a n
W
zm
o�z
wo z
a jr z
wQ
—wz=�
m U W 7 0
0
W4WmC
S140rZ
�
O � O�ac
z P
wC� v1�3
a Lo2�
foo
�L•rz
-v o
Wz�N
7 :2.2=
O O
Ul y d
_V)
U
Ln
cn
Q
O
O
7
7�1
Rll
LD
rl
Ln
z
is
00
z
VJ
ROB --w
= Oz
0- -
U
Baa
,3
L.' z- 2
m7we
0
<
Z
0
0
' � c
I m
m
J
spm M17-, _ J o
oW ^o
0 C7
I +27" w w U
3wr Z�
of ���
a000
I-- o¢ o
o
Waw 3
c> a i
wzdm ¢'o
U O
a
Ll d O W
zu=in
z
z w
pox
�3
rpx�l
�Wo
O V � o=x
OW F— m Q O V w O� O
CL- Cif
Wi JO Z ~ V)mm }fit UJ 'x 6p
W W J U m W u
CL
to r d m
OQcn O� a� zrp
W U p w _ a0
�j>zd
�z
o Yana mm nolo
22 Lo V =
VI O C7 o p
H G
H Q J cn
w Wzo UmN m ow Fo
nconcr
7 w w x m m y
J Ln 2 2 W W V)
V1
- JO pm mw ¢� v�V)
w cn
? o= O V)— pm
Irl 22
mz
y! z
Lis
•Ll. �`�' F 'i-. 7" O V -f v1 J 2 <
•.,. - i
�a
J .x (N Li d a af (i1
'-- 0
W V z_ x
i
f z xo� o
_ 1
o Lei
r ' m (!)
y- —� V)
J a
I F� o
O
0 -
to
-to J
0
r
LTJ a
m
�O
0 Q w J
ma U}
rW InmJ
0m
> U J W V
J m d Q w
waX r r
¢oz �LJ
��
mLLI
J o
-x0 U �a p�Q x
S O O W
m3m o U O
J
LJ w
O o Fw-
} z cn
J >-
m>cn
g U w
L°z
¢ a
r
w �
x
Q
}
j a
a
i
I
i
I
i
c �' tow
� 0 ,,, `L J ' r, � � .� y � �, c .--; � v v u ✓' ai .M
A Wz S L �yr0.^ w.�t v
� L
.a��,jWrE�"„'�� � ° �• rn�� y ov v o � y L ��Vo'•�E ;� y � � �'c � air �c � � �� y�
FZ•Z.E+r v _ U e c��on c'� ._• L 0.•m ^_� L J.� �Ciav v j o r �s ax
fs. .rZ� O °) c17 n L� `�v, _ N^ avr_Q >'�Q y„ r, y.= v a.� Fr•i
W Wt..� � ... �U u � v y.� �.-oo � �— ..'��h � 5':� v 3 `o�' ;� W �•b w c �a
W�HWtu]�s r,
3
J�z��a� c.c '� � fl.,: wN _ �•.., q.�,.. � .. � �L x pc � c; `.�� c c cn � � L.v.�� � �C
^rj'ri<t
z7�p7,�^Oca7
Z47z�E a �Q n.�' n�e� y.� c ''. ^� c c x c y r , t v❑ a o.� c_ 3 �'� oq o
LTJ LU°cE6o.?c1�oo ��M.U��_u
.j3ccM Q y a ❑ � � � m � a� � Cs �C
a.ee� Y o �Gcr, n.0 CL rl c
L)
CC�7:�zs
U
wz
s
v° Sao
8,�����
CIO
�r4l
U4 ami C.
a
Con
�I
c
1
c ;z izcoo
U
i�•I
C
a�
^r
tr
CAA
wQ
o ai w
O
o
cl� �
3a.ocin°-'
�F
3
EL-
L)
AFFIDAVIT OF SERVICE BY MAILING
STATE OF WASHINGTON }
ss.
County of King )
Nancy Thompson being first duly sworn, upon oath, deposes and states:
That on the 23rd day of November 2009, affiant deposited via the United States Mail a
sealed envelope(s) containing a decision or recommendation with postage prepaid,
addressed to the parties of record in the below entitled application or petition.
Signature
r�
SUBSCRIBED AND SWORN to before me thi&) day of 2009.
1
Nota Public ��d for the State of Wa inoton
..gesiding at m , therein.
Application, Petition or Case No.: Football Northwest Platform Lift
LUA 09-134, ECF, SM, SMC
The Decision or Recommendation contains a complete list of the Parties of Record.
•
HEARING EXAMINER'S REPoR,r
J-
•
November 23. 2009
OFFICE OF THE HEARING EXA11NTINER
CITY OF RENTON
REPORT AND RECOMMENDATION
APPLICANTJOWNER: Football Northwest LLC
Attn: Lance Lopes
12 Seahawks Way
Renton, WA 98056
CONTACT: Alan Foltz
Waterfront Construction, Inc.
205 NE Northlake Way, Ste. 230
Seattle, WA 98105
LUA-09-134, EFC, SM, SMC
LOCATION: 12 Seahawks Way
SUMMARY OF REQUEST: Shoreline Conditional Use Permit and a Shoreline Substantial
Development Permit for the installation of a pre -manufactured,
freestanding platform (boat) lift in association with an existing
dock on Lake Washington.
SUMMARY OF ACTION: Development Services Recommendation: Approve
DEVELOPMENT SERVICES REPORT: The Development Services Report was received by the Examiner
on November 10, 2009.
PUBLIC HEARING: After reviewing the Development Services Report, examining
available information on file with the application, field checking
the property and surrounding area; the Examiner conducted a
public hearing on the subject as follows:
MINUTES
The following minutes are a summary of the November 17, 2009 hearing.
The legal record is recorded on CD.
The hearing opened on Tuesday, November 17, 2009, at 9:01 a.m. in the Council Chambers on the seventh floor
of the Renton City Hall. Parties wishing to testify were affirmed by the Examiner.
The following exhibits were entered into the record:
Exhibit No. 1: Yellow file containing the original Exhibit No. 2: Vicinity Map
application, reports, staff comments and other
documentation pertinent to this request.
Exhibit No. 3: Zoning Map Exhibit No. 4: Plan View
1
Football Northwest PlatfornTC.ift Shoreline Conditional Use
File No.: LUA-09-134, ECF, SM, SMC
November 23, 2009
Page 2
The hearing opened with a presentation of the staff report by Gerald Wasser, Associate Planner, Community and
Economic Development, City of Renton, 1055 S Grady Way, Renton, Washington 98055. The platform lift is 10'
x 20' and is proposed to be freestanding, marine grade aluminum that would be operated by non-toxic hydraulic
fluid and solar powered. It would sit directly on the lake bottom on four foot pads that would be approximately
12" x 18" and would be on the north side of the existing 150' dock. The boatlift would be approximately 230-
240' south of the northerly property line. The installation would be within the established fish window of July 16
through December 31 unless extended by the appropriate agency. The actual installation would take part of one
day and would be installed via a construction barge with a barge mounted crane.
The Environmental Review Committee issued a Determination of Nan -Significance, no appeals were filed.
The platform lift will be installed as a safety measure. The level of the lake is low for approximately eight
months of the year. The level of the deck of the dock is approximately 2.5 feet above lake level and at low water
levels it is approximately 4.5 feet above the lake level. This platform lift is intended for smaller vessels to
provide a step up to the dock level. The dock is for day use only, no storage of vessels are permitted on the dock,
next to the dock or on the platform lift itself.
The Examiner inquired as to how the lift would work and what exactly is the plan for this lift.
Mr. Wasser stated that it would be just on a day use basis where smaller boats, including kayaks would be
temporarily moored to the dock, it would be only one vessel at a time.
The project is compatible with the five Shoreline Conditional Use Permit approval criteria which include
compatibility with other permitted uses in the area, the use does not interfere with the public use of the shoreline,
the design would be compatible with the surroundings and the City's Master Program, the use would be in
harmony with the general purpose and intent of the City's Master Program, and the use meets code requirements.
One Misty Cove owner called and complained that the building and platform lift would impede views and I ight to
her property, she further felt that the lift was not necessary and views from her property would suffer as a result of
the boatlift. Mr. Wasser stated that he believed the comments regarding the building are untimely since it is an
existing use and has already been approved. The boatlift would be a low profile and allows light penetration, no
boats would be stored on it. Some views could be impeded due to the construction, but would be very short term.
Alan Foltz, Waterfront Construction LLC, 205 NE Northlake Way, Ste. 230, Seattle 98105 stated that he is a
permit coordinator with Waterfront Construction. When the dock was completed and final inspection was done
by the City of Renton, the dock was constructed as designed at 2.6" above ordinary high water. In the winter the
lake started to go down, and the lake drops about two feet, the client found the dock to be too high off the water
and too difficult for people to get onto the dock from a small boat_ The platform lift appears to compensate for
Exhibit No. 5: Detail View and Elevation View
Exhibit No. 6: Platform Lift Assembly
Exhibit No. 7: ERC Determination (DNS)
Exhibit No. 8: Shoreline Substantial Development
Permit
Exhibit No. 9: Picture of Platform Lift in UP Position
Exhibit No. 10: Letter from Washington State Fish
and Wildlife stating a HPA would not be required.
The hearing opened with a presentation of the staff report by Gerald Wasser, Associate Planner, Community and
Economic Development, City of Renton, 1055 S Grady Way, Renton, Washington 98055. The platform lift is 10'
x 20' and is proposed to be freestanding, marine grade aluminum that would be operated by non-toxic hydraulic
fluid and solar powered. It would sit directly on the lake bottom on four foot pads that would be approximately
12" x 18" and would be on the north side of the existing 150' dock. The boatlift would be approximately 230-
240' south of the northerly property line. The installation would be within the established fish window of July 16
through December 31 unless extended by the appropriate agency. The actual installation would take part of one
day and would be installed via a construction barge with a barge mounted crane.
The Environmental Review Committee issued a Determination of Nan -Significance, no appeals were filed.
The platform lift will be installed as a safety measure. The level of the lake is low for approximately eight
months of the year. The level of the deck of the dock is approximately 2.5 feet above lake level and at low water
levels it is approximately 4.5 feet above the lake level. This platform lift is intended for smaller vessels to
provide a step up to the dock level. The dock is for day use only, no storage of vessels are permitted on the dock,
next to the dock or on the platform lift itself.
The Examiner inquired as to how the lift would work and what exactly is the plan for this lift.
Mr. Wasser stated that it would be just on a day use basis where smaller boats, including kayaks would be
temporarily moored to the dock, it would be only one vessel at a time.
The project is compatible with the five Shoreline Conditional Use Permit approval criteria which include
compatibility with other permitted uses in the area, the use does not interfere with the public use of the shoreline,
the design would be compatible with the surroundings and the City's Master Program, the use would be in
harmony with the general purpose and intent of the City's Master Program, and the use meets code requirements.
One Misty Cove owner called and complained that the building and platform lift would impede views and I ight to
her property, she further felt that the lift was not necessary and views from her property would suffer as a result of
the boatlift. Mr. Wasser stated that he believed the comments regarding the building are untimely since it is an
existing use and has already been approved. The boatlift would be a low profile and allows light penetration, no
boats would be stored on it. Some views could be impeded due to the construction, but would be very short term.
Alan Foltz, Waterfront Construction LLC, 205 NE Northlake Way, Ste. 230, Seattle 98105 stated that he is a
permit coordinator with Waterfront Construction. When the dock was completed and final inspection was done
by the City of Renton, the dock was constructed as designed at 2.6" above ordinary high water. In the winter the
lake started to go down, and the lake drops about two feet, the client found the dock to be too high off the water
and too difficult for people to get onto the dock from a small boat_ The platform lift appears to compensate for
Football Northwest Platform Lift Shoreline Conditional Use
File No.: LUA-09-134, ECF, SM, SMC
November 23, 2009
Page 3
the varying levels of the lake and allows small boats including kayaks to reach the dock anytime during the year.
The lift would have a grating on top that matches the grating on the dock itself. This lift is very useful due to the
safety characteristics. The lift can come to the dock level, but the main intent is to have it at an intermediate level
so that it is safer for boaters to use that dock. The top of the lift can be lowered all the way to the lake bottom so
it is not a hazard to boats coming alongside the dock. The lift would be lowered just enough for a low draft boat
to pull over the lift and be raised to the dock level for safe exiting.
The client would like to have this installed as soon as possible, they would like to have it operating for the 2010
practice season and the work window does not open until July 16. They would like to have this installed prior to
the end of December this year. A Corps of Engineer permit has been applied for and a note has been received
stating that the boatlift complies with their Regional General Permit 1, which approves boatlifts for Lake
Washington. A condition states that if this is the first boatlift for the pier facility, which this is, it can be instal led
prior to receiving the Corps permit. This lift does comply with RGP 1 Category A.
Kayren Kittrick, Community and Economic Development stated everything look good, the Metro seN er line is on
the east side of this property but that before doing any work, they should always call before digging or working on
the bottom of the lake.
The Examiner called for further testimony regarding this project. There was no one else wishing to speak, and
no further comments from staff. The hearing closed at 9:32 a.m.
FINDINGS, CONCLUSIONS & RECOMMENDATION
Having reviewed the record in this matter, the Examiner now makes and enters the following:
FINDINGS:
The applicant, Football Northwest LLC, filed a request for a Shoreline Conditional Use Permit as well as
a Shoreline Substantial Development Permit to install a boatlift in Lake Washington.
2. The yellow file containing the staff report, the State Environmental Policy Act (SEPA) documentation
and other pertinent materials was entered into the record as Exhibit ##1.
The Environmental Review Committee (ERC), the City's responsible official issued a Determination of
Non -Significance (DNS).
4. The subject proposal was reviewed by all departments with an interest in the matter.
There was no opposition from the public regarding the subject proposal.
6. The subject site is located at 12 Seahawks Way. The subject site is located west of Lake Washington
Boulevard on the shoreline of Lake Washington.
The map element of the Comprehensive Plan designates the area in which the subject site is located as
suitable for the development of commercial, office and residential uses, but does not mandate such
development without consideration of other policies of the Plan.
The subject site is currently zoned COR (Commercial, Office and Residential).
Football Northwest Platfowift Shoreline Conditional Use
File No.: LUA-09-134, ECF, SM, SMC
November 23, 2009
Page 4
9. The subject site was annexed to the City with the adoption of Ordinance 1823 enacted in April 1960.
10. The subject site is approximately 16.56 acres of 721,580 square feet_ A portion of the property extends
out into the lake.
it. The Seattle Seahawks Headquarters and Training facility is located on the subject site. An existing 150
foot long dock or pier extends out into the lake. The dock is approximately 250 feet from the north
property line.
12_ The applicant proposes installing a boatlift near the end of the pier. The boatlift would be installed on the
north side of the pier.
13. The boatlift would be approximately 10 feet wide by 20 feet long. It would have a surface area of
approximately 200 square feet. The boatlift would be freestanding and portable. It would be constructed
of marine grade aluminum. It would have a grated deck that allows light to pass making it less likely to
harbor salmon predators. It would rest directly on the lake bottom on four 12 -inch by 18 -inch footpads.
14. The applicant noted that the lake's surface level varies during the year as the lake is lowered to
accommodate increased flows and/or drawdowns. The lift would allow smaller craft to be lifted out of
the lake, no matter what the water level is. The lift is intended for interim use to lift smaller, day -craft out
of the water so that they can access the overall Seahawks training site. It would be a flat surfaced grate
and not contain a cradle. No permanent storage would be accommodated by the lift. It would only be
used for day use to allow entry and exit to/from the water.
15. The lift would be installed via a barge. It would take approximately one -day for installation.
16. The work will be done in the time window specified by the state to avoid interfering with salmon activity
in the lake. In this case, the applicant hopes to meet the deadline of December 31.
17. Lake Washington's shoreline is classified as a Shoreline of Statewide Significance and therefore any
development adjacent to it or, as in this case, in the lake, is subject to the City's Shoreline Master
Program. This section of the shoreline is designated as an Urban Shoreline.
1$_ Docks are permitted in this area of the lake. Boatlifts are not a listed use nor are they a prohibited use
and, therefore, are subject to a shoreline conditional use review.
CONCLUSIONS:
The criteria for approving a Shoreline Conditional Use permit are twofold. There are City criteria and
those City criteria require compliance with additional State criteria. Those criteria are as follows:
Renton: Section 4-9-190.1.5:
5. Conditional Use:
a. Purpose: Upon proper application, a conditional use permit may be granted. The objective of a
conditional use provision is to provide more control and flexibility for implementing the
Football Northwest Platform Lift Shoreline Conditional Use
File No.: LUA-09-134, ECF, SM, SMC
November 23, 2009
Page 5
regulations of the Master Program. With provisions to control undesirable effects, the scope of
uses can be expanded to include many uses.
b. Decision Criteria: Uses classified as conditional uses can be permitted only after consideration
and by meeting such performance standards that make the use compatible with other permitted
uses within that area. A conditional use permit will be granted subject to each of the following
conditions:
i. The use must be compatible with other permitted uses within that area.
ii. The use will not interfere with the public use of public shorelines.
iii. Design of the site will be compatible with the surroundings and the City's Master
Program.
iv. The use shall be in harmony with the general purpose and intent of the City's Master
Program.
v. The use meets the conditional use criteria in WAC 173-27-160.
Washington State: WAC 173-27-160:
Review criteria for conditional use permits. The purpose of a conditional use permit is to provide a
system within the master program which allows flexibility in the application of use regulations in a
manner consistent with the policies of RCW 90.58.020. In authorizing a conditional use, special
conditions may be attached to the permit by local government or the department to prevent undesirable
effects of the proposed use and/or to assure consistency of the project with the act and the local master
program.
(1) Uses which are classified or set forth in the applicable master program as conditional uses
may be authorized provided that the applicant demonstrates all of the following:
(a) That the proposed use is consistent with the policies of RCW 90.58.020 and the
master program;
(b) That the proposed use will not interfere with the normal public use of public
shorelines;
(c) That the proposed use of the site and design of the project is compatible with other
authorized uses within the area and with uses planned for the area under the
comprehensive plan and shoreline master program;
(d) That the proposed use will cause no significant adverse effects to the shoreline
environment in which it is to be located; and
(e) That the public interest suffers no substantial detrimental effect.
Football Northwest Platfoi4llR,ift Shoreline Conditional Use
File No.: LUA-09-134, ECF, SM, SMC
November 23, 2009
Page 6
(2) In the granting of all conditional use permits, consideration shall be given to the cumulative
impact of additional requests for like actions in the area. For example, if conditional use perm its
were granted for other developments in the area where similar circumstances exist, the total of the
conditional uses shall also remain consistent with the policies of RCW 90.58.020 and shall not
produce substantial adverse effects to the shoreline environment.
(3) Other uses which are not classified or set forth in the applicable master program may be
authorized as conditional uses provided the applicant can demonstrate consistency with the
requirements of this section and the requirements for conditional uses contained in the master
program.
(4) Uses which are specifically prohibited by the master program may not be authorized pursuant
to either subsection ( I ) or (2) of this section.
The area in which the subject site is located is zoned to allow commercial, residential and office uses_
Docks and piers associated with those types of uses are permitted in the COR zone and have been
developed in that zone_ Some of those properties with docks have recently received approvals to install
boatlifts in combination with those docks. The boatlift proposed by the applicant appears to be
compatible with the uses located in this area. It will rise up out of the lake to approximately two feet
below the existing dock. In no case will it rise above the level of the dock. The applicant does not intend
to use the lift to store boats so no boat or boats will be permanently moored or stored on the lift.
Therefore, the profile of structures above the lake will not change other than the potential small craft
temporarily located on the lift.
3. The proposed boatlift should not interfere with any public use of the shoreline. The applicant already has
a dock and this proposal will add a flat lift. It will not create any additional obstacles toward navigation.
This shoreline is privately owned with public access granted by the Seahawks.
4. The lift will be setback from property lines more than required by code and will not create any untoward
impacts on adjacent uses or on water -oriented uses.
The next series of criteria are contained within the Washington Administrative Code. One of the
paramount goals is to protect the ecology of the shoreline. In this case, there should be no change other
than some disturbance of the lake bottom but this will occur at a time that limits interference with salmon.
6. The lot, as noted, is private and it extends out into the lake. The proposed lift will serve the lot. Private
uses are permitted in this area of the shoreline. The use is similar to those uses permitted in an urban
shoreline. The use should not impair the public use of this section of the lakeshore or the water in its
vicinity.
7. The low -scale boatlift will not interfere with any uses that might occur in this area of the lake. The
comprehensive plan designates this area as suitable for commercial, residential and office uses and the
normal complement of accessory uses. On a lakeshore property, piers,docks and similar uses including a
boatlift are considered reasonable accessory uses.
8. The proposed boatlift should not create any significant adverse affects on the shoreline environment.
9. The installation of the boatlift should not further harm the public interest.
Football Northwest Platform Lift Shine Conditional Use
File No.: LUA-09-134, ECF, SM, SMC
November 23, 2009
Page 7
10. As noted in earlier decisions, the analysis of cumulative impact or impacts is hard to judge. A dock
already protrudes out into the lake at this location and other docks extend from many of the homes in the
area. Clearly, there have had to be impacts to water quality and habitat as a result of motor boating and
docks shading the lake and some of the shallow areas. This additional action will probably not have
much effect on the overall circumstances.
11. Since boatlifts are neither permitted nor prohibited outright, they do require review under the Conditional
Use criteria. The proposal use and restoration are generally consistent with the criteria noted above.
RECOMMENDATION:
The Conditional Use Permit and the Shoreline Substantial Development Permit for the single boatlift
should be approved.
ORDERED THIS 23rd day of November 2009.
FRED J. KA Zg\4AN
HEARING EXAMINER
TRANSMITTED THIS 23rd day of November 2009 to the parties of record:
Gerald Wasser Alan Foltz Kayren Kittrick
1055 S Grady Way Waterfront Construction, Inc. Community & Economic Dcv.
Renton, WA 98055 205 NE Northlake Way, Ste. 230 City of Renton
Seattle, WA 98105
Football Northwest LLC
Lance Lopes
12 Seahawks Way
Renton, WA 98056
TRANSMITTED THIS 23rd day of November 2009 to the following:
Mayor Denis Law
Jay Covington, Chief Administrative Officer
Julia Medzegian, Council Liaison
Marty Wine, Assistant CAO
Gregg Zimmerman, PBPW Administrator
Alex Pietsch, Economic Development
Jennifer Henning, Development Services
Stacy Tucker, Development Services
Dave Pargas, Fire
Larry Meckling, Building Official
Planning Commission
Transportation Division
Utilities Division
Neil Watts, Development Services
Janet Conklin, Development Services
Renton Reporter
Football Northwest PlatfoWift Shoreline Conditional Use
File No.: LUA-09-131, ECF, SM, SMC
November 23, 2009
Page 8
Pursuant to Title IV, Chapter 8, Section I OOGof the City's Code, request for reconsideration must be filed in
writing on or before 5.00 p.m., December 7, 2009 Any aggrieved person feeling that the decision of the
Examiner is ambiguous or based on erroneous procedure, errors of law or fact, error in judgment, or the discovery
of new evidence which could not be reasonably available at the prior hearing may make a written request for a
review by the Examiner within fourteen (14) days from the date of the Examiner's decision. This request shall set
forth the specific ambiguities or errors discovered by such appellant, and the Examiner may, after review of the
record, take further action as lie deems proper.
An appeal to the City Council is governed by Title IV, Chapter 8, Section 110, which requires that such appeal be
filed with the City Clerk, accompanying a filing fee of $250,00 and meeting other specified requirements. Copies
of this ordinance are available for inspection or purchase in the Finance Department, first floor of City Hall. An
appeal must be filed in writing on or before 5:00 .m. December 7 2009.
If the Examiner's Recommendation or Decision contains the requirement for Restrictive Covenants, the
executed Covenants will be required prior to approval by City Council or final processing of the file. You
may contact this office for information on formatting covenants.
The Appearance of Fairness Doctrine provides that no ex parte (private one-on-one) communications may occur
concerning pending land use decisions. This nxeans that parties to a land use decision may not communicate in
private with any decision -maker concerning the proposal. Decision -makers in the land use process include both
the Hearing Examiner and members of the City Council.
All communications concerning the proposal must be made in public. This public communication permits all
interested parties to know the contents of the communication and would allow them to openly rebut the evidence.
Any violation of this doctrine would result in the invalidation of the request by the Court.
The Doctrine applies not only to the initial public hearing but to all Requests for Reconsideration as well as
Appeals to the City Council.
- — - -- - — - EXHIBIT 3
r
- - ---
COR
CA - 32 T24N R5E W 1/2
ZONING — — — — RenLOa ti ifs I -L oo — —
P�B/M TEC@ZLCAL 9FR'nCU
��. ,o, 29 T24N R5E W 1/Z
PRCJE_, DES:CNED 5" EXHIBIT 4
W�r$'mit Con t udi71 h1c,
THIS DOC UMEW IS PROPRIETARY FIROPERIY OF 'NATERFRONT
CONSTRUCTION INC.. ANP IS NOT TO DEUSED. IN WHOLE OR IN
PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN
AUTHORIZATION CF WATERFRONT CONSTRUCT]ON 1NC_
'A'E&,.Tfr,)%Corl.,}ridlon 4nC, EXHIBIT 6
THh D,)CUTAENT iE M)PRUAkY F'BpI+F.RTY Oi WATEY.}R( NI
I:ON STHtj;.TIpN WC... a,VD IS NOT TO QE U�CD, IN R'aOLE OR :N
PART. FOR 4NY CITHER f°Ti{'JI'.f:i WITHDOT TkE Vr'P.ITTEN
nllTHORIWTIpN' Of 'tin'i:Itl-RONT CDNITRUC?IGN I+JC.
i
w(, O
_ V
L)7
r _r _
W O
r x C7 I
La
O Com] _ U q � ` C7
Q v) w ,� Ln Q O
H` ff }} 1 yC ` w cn U O v�
iXii 2 y_ i!1 J W J J W H
[] w 7 D 'o ED I-- W Z IY yr
z z s n w x o o¢ J a Lo f:
a (A 3 ¢ a o
o'
Ozr x O
l¢ a X Itfn 4 u] n
w w
i Z (f7 CC F
J ¢ Q l_ w a c
x p J O CD a s z fn o
�i F n z
'_1�`. J zw� }moo tea'
s J m CC ('!
�o
v z _x
< 7 -
if tfof J
_77=fJ_� .rJ - JLLJ
�
—J Q
l J CD
CD
ul
C Dwj -
�7 -- - w15:
I � ' CD
LL-
-_— O ~
l m J r cc
� O
` � w
� � U
_ � r M
S J m O Q x
w d x
V, Z W W
.._ a fJ S W J
D x } Q
W~'> aF-
Q W-1- m ¢
�
o= zo
Lj
LLd Y- o tJ ' Z
�
pian _
ni h w 5 m W
n9 Div 0 io n � o W (�
(Jcz F-
T In
J J
cnz
a
n
ci
>
F�
4
Q
Denis Law
Mayor
November 30, 2009
State Department of Ecology
Northwest Regional Office
3190 160th Ave. SE
Bellevue, WA 98008-5452
\lcI ID,Q,�
City of, s' c�
RN
Department of Community and Economic Development
Alex Pietsch,Administrator
SUBJECT: Shoreline Management Substantial Development Permit and Shoreline Conditional
Use Permit for Football Northwest Platform Lift
File No. LUA09-134, ECF, SM, SMC
Dear Sir or Madam:
Enclosed is the Shoreline Substantial Development Permit and Shoreline Conditional Use Permit for
the above referenced project. The permit was issued by the City of Renton on November 30, 2009.
A Determination of Non -Significance was issued by the City's Environmental Review Committee on
October 26, 2009. The appeal period ended November 13, 2009, no appeals of the threshold
determination were filed.
We are filing this action with the Department of Ecology and the Attorney General per WAC 173-14-
090. Please review this permit and attachments and contact me at (425) 430-7382 if you have any
questions or need additional information.
SincereV
♦ f
Gerald Wasser
Associate Planner
Enclosures: Shoreline Substantial Development Permit
Notice of Application
SEPA Checklist
SEPA Determination
DNS Advisory Notes
cc: Office of Attorney General
Owner/Applicant: Football Northwest LLC, Attn: Lance Lopes
Karen Walter, Muckleshoot Indian Tribe Fisheries Division
Jennifer Henning, Planning Manager
Yellow File
Plan view
Hearing Examiner Decision
Legal Description
Copy of Master Application
Project Narrative
Neighborhood Detail Map
LUA09-074. d o c
Renton City Hall 0 1055 South Grady Way • Renton, Washington 98057 • ren ton wa.gov
•
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
PLANNING DIVISION
SHORELINE MANAGEMENT ACT OF 197
PERMIT FOR SHORELINE MANAGEMENT
EVALUATION FORM & DECISION
DATE OF PERMIT ISSUANCE:
LAND USE ACTION FILE NO.:
DATE RECEIVED
DATE OF PUBLIC NOTICE:
TYPE OF ACTION(S):
November 30, 2009
LUA09-134, ECF, SM, SMC
October 8, 2009
October 9, 2009
® Substantial Development Permit
® Conditional Use Permit
❑ Variance Permit
Pursuant to Chapter 90.58 RCW, the Hearing Examiner recommends that the City of Renton
grant a Shoreline Substantial Development Permit and a Shoreline Conditional Use Permit.
This action is proposed on the following application:
PROJECT NAME: Football Northwest Platform Lift
PROJECT MANAGER: Gerald Wasser, Associate Planner
OWNER/APPLICANT: Football Northwest LLC, 12 Seahawks Way, Renton,
WA 98056
CONTACT: Alan Foltz, Waterfront Construction, Inc., 205 NE
Northlake Way, Suite 230, Seattle, WA 98105
PROJECT LOCATION: 12 Seahawks Way
LEGAL DESCRIPTION: See Attachment A
SEC-TWN-R: NE 1/4 Section 31, Township 24N, Range 5E
WITHIN THE SHORELINES OF: Lake Washington
APPLICABLE MASTER PROGRAM: City of Renton
PROPOSAL DESCRIPTION: The applicant has requested an Environmental
Determination, approval of a Shoreline Conditional Use Permit and a Shoreline Substantial
Development Permit for the installation of a pre -manufactured, freestanding platform (boat)
lift in association with an existing dock on Lake Washington, a Shoreline of Statewide
0
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
•
Gly
PLANNING DIVISION
SHORELINE MANAGEMENT ACT OF 1971
PERMIT FOR SHORELINE MANAGEMENT
EVALUATION FORM & DECISION
DATE OF PERMIT ISSUANCE:
LAND USE ACTION FILE NO.:
DATE RECEIVED
DATE OF PUBLIC NOTICE.
TYPE OF ACTION(S):
November 30, 2009
LUA09-134, ECF, SM, SMC
October 8, 2009
October 9, 2009
® Substantial Development Permit
® Conditional Use Permit
❑ Variance Permit
Pursuant to Chapter 90.58 RCW, the Hearing Examiner recommends that the City of Renton
grant a Shoreline Substantial Development Permit and a Shoreline Conditional Use Permit.
This action is proposed on the following application:
PROJECT NAME: Football Northwest Platform Lift
PROJECT MANAGER: Gerald Wasser, Associate Planner
OWNER/APPLICANT: Football Northwest LLC, 12 Seahawks Way, Renton,
WA 98050
CONTACT: Alan Foltz, Waterfront Construction, Inc., 205 NE
Northlake Way, Suite 230, Seattle, WA 98105
PROJECT LOCATION: 12 Seahawks Way
LEGAL DESCRIPTION: See Attachment A
SEC-TWN-R: NE 1/4 Section 31, Township 24N, Range 5E
WITHIN THE SHORELINES OF: Lake Washington
APPLICABLE MASTER PROGRAM: City of Renton
PROPOSAL DESCRIPTION: The applicant has requested an Environmental
Determination, approval of a Shoreline Conditional Use Permit and a Shoreline Substantial
Development Permit for the installation of a pre -manufactured, freestanding platform (boat)
lift in association with an existing dock on Lake Washington, a Shoreline of Statewide
City of Renton Deportment of Community & Fconomic development Shoreline Management Permit
Football Northwest Platform Lift LUA09-334, ECF, SM, SMC
DATE OF PERMIT: November 30, 2009 Page z of 3
Significance. The proposed project is associated with the Seattle Seahawks Headquarters and
Training Facility on a 721,580 square foot lot in the Commercial/Office/Residential (COR)
Zone. The proposed platform lift would be transported to the site by barge and positioned by
a barge -mounted crane. All work would take place within the construction window
established for this area of Lake Washington (July 16 through December 31).
The following section/page of the Master Program is applicable to the development:
RMC Section
Description
Page
4-3-090J
Urban Environment
3-25
4-3-090K
General Use Regulations for All Shoreline Uses
3-26
4-3-090L
Specific Use Regulations
3-27
4-3-090M
Variances and Conditional Uses
3-39
4-9-1901.1, 2, 3, 5
Variances and Conditional Uses
9-54
Development of this project shall be undertaken pursuant to the following terms and
conditions:
1. The applicant shall comply with all construction conditions of State agencies.
This Permit is granted pursuant to the Shoreline Management Act of 1971 and pursuant to the
following:
1. The issuance of a license under the Shoreline Management Act of 1971 shall not release
the applicant from compliance with federal, state, and other permit requirements_
2. This permit may be rescinded pursuant to Section 14(7) of the Shoreline Management
Act of 1971 in the event the permittee fails to comply with any condition(s) hereof.
3. Construction permits shall not be issued until twenty-one (21) days after approval by
the Washington State Department of Ecology or until any review proceedings initiated
within this twenty-one (21) day review period have been completed.
V
C. E. "Chip" Vincent, Planning Director Date
Planning Division
APPEALS: Appeals of Shoreline Substantial Development Permit issuance must be made
directly to the Shorelines Hearings Board. Appeals are made by filing a request in writing within
the twenty-one (21) days of receipt of the final order and concurrently filing copies of such
request with the Washington State Department of Ecology and the Attorney General's office as
City of Reotoo Department of Community & Economic Development 9horelioe l uoogemerrt Permit
Football Northwest Platform Lift LUA09-134, ECF, SM, SMC
DATE OF PERMIT: November 30, 2009
Page 3 of 3
provided in section 18(1) of the Shorelines Management Act of 1971. All copies of appeal
notices shall also be filed with the City of Renton Planning Division and the City Clerk's office.
EXPIRATION: Unless a different time period is specified in the shoreline permit as authorized
by RCW 90.58.143 and subsection J1 of RMC 4-9-190, construction activities, or a use or
activity, for which a permit has been granted pursuant to this Master Program must be
commenced within two (2) years of the effective date of a shoreline permit, or the shoreline
permit shall terminate, and a new permit shall be necessary. However, the Planning Division
may authorize a single extension for a period not to exceed one year based on reasonable
factors, if a request for extension has been filed with the Planning Division before the
expiration date, and notice of the proposed extension is given to parties of record and the
Washington State Department of Ecology. DEFINITION OF COMMENCEMENT OF
CONSTRUCTION ACTIVITIES: the construction applications must be submitted, permits must be
issued, and foundation inspections must be completed before the end of the two (2) year
period.
Attachments:
A. Legal Description
B. Plan View
cc: Attorney General's Office
Owner/Applicant — Football Northwest LLC
Contact — Alan Foltz, waterfront Construction, Inc.
City of Renton Offical File
•
LEGAL DESCRIPTION
BAXTER PARCEL SOUTH RENTON LUA-00-044 LUA REC NO 20010105900005 WCH IS POR OF SW 114
29-24-05 LY \NLY OF BN RR CO RAN
BAXTER PARCEL NORTH RENTON LUA-00-044 LLA REC NO 20010105900005 WCH IS POR OF S'v'V 114
29-24-05 LY WLY OF BN RR CO RM
1p PROJECT DESIUNM av
Vd��r{r[JIIi l,GY1��n"UCilC�l1 1i3C.
THIS DOCOMENT JS PRDPWETARY Pp;)PERTY OF WATFHFRpNi
CDN57tuLiIGN INC., WD IS NDT To SE ULO. IN WHOLE OR IN
fA4T, Fr}H ANY OT}1ER PROJECT WITHOUT THE WR17F14
-.�— Fl!7HOP.d.'A.I Il1N GF WATERFHON'T CONSTRUCTION INC.
�-_� Ex15TIYJG
4�P UIOWSHED TO BL
RCANED
---- --
\Y < 1
CHWL 71 t'0' AT
5-1D 1/2'• ExiSTIhG � % � \ ins,
ShiORELINE °' k
PROPOSED
PLATFORM LIFT
150' y
EVSTING f -ULLY
GRATED PIER
EXISTING FULLY
GF'ATED RAMP
PLAN VIEW
100' 50' ZO' D' 00
SCALF 1 "= 100'
APPLIC' T. OTBALL NW LLC
PRfJPOSED:PROVIDE FREE STAraDING FULLY
GRATED PLATFORM LIFT.
NEAR/AT- LAKE WAS1HNGT01y7'RE4TON
SHEEi:3 OF:S —
DATE: 10-7-09 pvf—cp 07-52020-A-3.1
L
PLAN VIEW
100' 50' ZO' D' 00
SCALF 1 "= 100'
APPLIC' T. OTBALL NW LLC
PRfJPOSED:PROVIDE FREE STAraDING FULLY
GRATED PLATFORM LIFT.
NEAR/AT- LAKE WAS1HNGT01y7'RE4TON
SHEEi:3 OF:S —
DATE: 10-7-09 pvf—cp 07-52020-A-3.1
�1
E
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
Northwest Regional Office • 3190 160th Avenue SE • Bellevue, Washington 98008-5452 • (425) 649-7000
December 11, 2009
Football Northwest LLC
Atte: Lance Lopes
12 Seahawks Way
Renton., WA 98056
Dear Lance Lopes:
Subject: City of Renton Local Permit 4LUA-09-134, RFC, SM, SMC
Football Northwest - Applicant
Shoreline Conditional Use Permit 2009 NW 70065 - APPROVED
Purpose: Notification of Receipt and Approval of Conditional Use Permit
City of Renton
Plat_;0io,q Division
DEL I6ii1
On December 2, 2009, the Department of Ecology (Ecology) received the City of Renton decision on
your Shoreline Conditional Use Permit for installation of a free-standing boatlift.
By law, Ecology must review all Conditional Use Permits for compliance with the following:
• The Shoreline Management Act (Chapter 90.58 RCW)
0 Ecology's Conditional Use Permit approval criteria (Chapter 173-27-160 WAC)
• The City of Renton Local Shoreline Master Program
After reviewing Conditional Use Permits for compliance, Ecology must decide whether to
approve, approve with conditions, or disapprove a Conditional Use Permit.
Our Decision:
Ecology approves your Conditional Use Permit provided your project complies with the
conditions required by the City of Renton. Please note, however, that other federal, state, and
local permits may be required in addition to this shoreline permit.
What Happens Next?
Before you begin activities authorized by this permit, the law requires you to wait at least 21
days from the mailing date of this letter {see certification above). This waiting period allows
anyone (including you) who disagrees with any aspect of this permit, to appeal the decision to
0
f
Football Northwest LLC
December 11, 2009
Page 2 of 2
the state Shorelines Hearings Board. You must wait for the conclusion of an appeal before you
can begin the activities authorized by this permit.
If no appeal is submitted you may begin activities any time after December 23, 2009
The Shorelines Hearings Board will notify you by letter if they receive an appeal. We
recommend, however, you contact the Shorelines Hearings Board before you begin permit
activities to ensure no appeal has been received. They can be reached at (360) 454-6327 or
hU:llwww.eho.wa.gov
If ,you want to appeal this decision, you can find appeal instructions (Chapter 461-08 WAC) at
the Shorelines Hearings Board website above. They are also posted on the website of the
Washington State Legislature at: http://aMs.leg wa. ova.
If you have any questions, please contact Barbara Nightingale at 425-649-4309.
Sincerely,
Geoff Tallent, Section Manager
Shorelands and Environmental Assistance Program
GT:BN:cja
Enclosure
cc: Gerald Wasser, City of Renton, Department of Community and Economic Development
Alan Foltz, Waterfront Construction Inc.
Dale Cramer, Football Northwest LLC
0 0
THIS SECTION FOR DEPARTMENT OF ECOLOGY USE ONLY IN REGARD TO A
CONDITIONAL USE
City of Renton Conditional Use Permit # LUA-09-134. ERFC SM, SMC
APPLICANT: Football Northwest LLC
DEPARTMENT OF ECOLOGY PERMIT # 2009 NW 70065
DATE RECEIVED BY THE DEPARTMENT: December 2, 2009
APPROVED: YES December 11, 2049
THIS CONDITIONAL USE PERMIT IS APPROVED BY THE DEPARTMENT PURSUANT
TO CHAPTER 90.58RCW with the following additional conditions:
1. The applicant hereby authorizes Ecology staff and their designees to have access to the
subject property for the purposes of compliance inspection and monitoring. Such right of
access shall begin from the date of the receipt of this letter, during construction, and
extend for a period of five years following project completion. Ecology staff must
provide reasonable verbal notice to the applicant or their designee prior to coming onto
the site.
2. Satisfy the City of Renton requirements and conditions for this project.
DATE: December 11, 2009
— z --z-
Geoff Tallent, Section Manager
..0
k
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
Northwest Regional Office • 3190 160th Avenue SE • Bellevue, Washington 98004-5452 * (425) 649-7000
December 11, 2009
Football Northwest LLC
Attn: Lance Lopes
12 Seahawks Way
Renton, WA 98056
Dear Lance Lopes:
city. of
plar7,�lr�g � �.��Qri
rQf7
DEc 16
�i ii C4 L
(�
e
Subject: City- of Renton Permit # LUA-09-134, EFC, SM. SMC
Football Northwest - Applicant
Shoreline Substantial Development Permit 4 2009 NW 70065 - APPROVED
Purpose: Notification of Receipt of Concurrent Permit Filings - Approval
On December 2, 2009, the Department of Ecology received notice that the City of Renton
approved your application for a substantial development permit. Your permit authorizes
installation of a freestanding boatlift within the shoreline jurisdiction of Lake Washington
(Chapter 90.58, RCW).
What Happens Next?
Before you begin activities authorized by this permit, the law requires you to wait at least 21
days from the date we received the decision letter from the City of Renton on December 2, 2009.
This waiting period allows anyone who may disagree with any aspect of this permit, including
you, to appeal the decision to the state Shorelines Hearings Board. If no appeal is submitted, you
may begin activities any time after December 23, 2009.
You must wait for the conclusion of an appeal before you can begin the activities authorized by
this pennit.
The Shorelines Hearings Board will notify you by letter if they receive an appeal. We
recommend, however, you contact the Shorelines Hearings. Board before you begin permit
activities to ensure no appeal has been received. They can be reached at (360) 459-6327 or
hh ://ww,,v.eho.wa.gov/Boards/SHB.asp.
If no appeal is submitted you may begin activities any time after December 23, 2009.
OW
to
C
Football Northwest LLC
December 11, 2009
Page 2 of 2
If you want to appeal this decision, you can find appeal instructions (Chapter 461-08 WAC) at
the Shorelines Hearings Board website above. They are also posted on the website of the
Washington State Legislature at: http://aT)ps.leg.wa. ovg_ /wac.
Please Be Advised:
A Shoreline Conditional Use Permit was concurrently filed with your substantial development
permit. Within 30 days we will notify you by letter of our decision on your Conditional Use
Permit. This permit has its own 21 day appeal period. You may not begin that portion of your
project until that appeal period has ended.
Other federal, state and local permits may be required in addition to this shoreline permit.
If you have any questions about this letter, please contact Barbara Nightingale at 425-649-4309.
Sincerely,
Barbara Nightingale, Regional Shoreline Planner
Shorelands and Environmental Assistance Program
BN:cja
cc: Gerald Wassser, City of Renton, Department of Community and Economic Development
Alan Foltz, Waterfront Construction Inc.
Dale Cramer, Football Northwest LLC
CITY OF RENTON
DEPARTMENT OF COMMUNTY & ECONOMIC DEVELOPMENT - PLANNING DIVISION
AFFIDAVIT OF SERVICE BY MAILING
On the 10th day of November, 2009, 1 deposited in the mails of the United States, a sealed envelope containing
Preliminary Report to the Hearing Examiner documents. This information was sent to:
Name
Representing
Alan Foltz
Contact
Football Northwest, LLC - Lance Lopes
Owner/Applicant
(Signature of Sender):
v'
STATE OF WASHINGTON
SS
COUNTY OF KING )
certify that I know or have satisfactory evidence that Stacy M. Tucker
signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses and purposes
mentioned in the instrument, _0 �r�lfi� �yti Ilan
Dated: t�ID,D ; . ,1 7
Notary Public in JAd for the State & Washington
- r
_r
Notary (Print):- ''04��FJ�� �+
My appointment expires: gj_jc ,_%C) F''Fw��;,.■�*-�F�,��
1111 a ��w
MOPFootball
.:mm ;:_
NW Platform Lift
amLUA09-134,
ECF, SM, SMC
Denis Law
Mayor City
i
Department of Community and Economic Development
Alex Pietsch, Administrator
November 10, 2009
Alan Foltz
Waterfront Construction, Inc.
205 NE Northlake Way #230
Seattle, WA 98105
SUBJECT: Football NW Platform Lift
LUA09-134, ECF, SM, SMC
Dear Mr. Foltz:
This letter is to inform you that the appeal period will end November 13, 2009 for the
Environmental Review Committee's (ERC) Determination of Non -Significance for the above -
referenced project.
If no appeals are filed on the ERC determination, the decision will be final. If the ERC
determination is appealed, the appeal will be heard as part of the Hearing Examiner public
hearing scheduled on November 17, 2009, where Site Plan Conditions may also be issued. The
applicant or representative(s) of the applicant are required to be present.
Enclosed is a copy of the Preliminary Report to the Hearing Examiner for your review. If you
have any questions, please feel free to contact me at (425) 430-7219.
For the Environmental Review Committee,
Gerald C. Wasser
Associate Planner
Enclosure
cc: Football Northwest LLC / Owner(s)
Renton City Hall 9 1055 South Grady Way • Renton, Washington 98057 • rentonwa.gov
DEPARTMENT OF COMMUNITY D cityof
AND ECONOMIC DEVELOPMENT
HEARING EXAMINER PUBLIC HEARING
November 17, 2009
AGENDA
COMMENCING AT 9:00 AM,
COUNCIL CHAMBERS, 7TH FLOOR, RENTON CITY HALL
The application(s) listed are in order of application number only and not necessarily the order in which they will be
heard. Items will be called for hearing at the discretion of the Hearing Examiner.
PROJECT NAME: Football NW Platform Lift
PROJECT NUMBER: LUA09-134, ECF, SM, SMC
PROJECT DESCRIPTION; The applicant has requested an Environmental Determination, approval of a
Shoreline Conditional Use Permit and a Shoreline Substantial Development Permit for the installation of
a pre -manufactured, freestanding platform (boat) lift in association with an existing dock on Lake
Washington, a Shoreline of Statewide Significance. The proposed project is associated with the Seattle
Seahawks Headquarters and Training Facility on a 721,580 square foot lot in the
Commercial/Office/Residential (COR) Zone. The proposed platform lift would be transported to the site
by barge and positioned by a barge -mounted crane. All work would take place within the established
construction window for this area (July 16 through December 31).
HEX Agenda 11-17-09.doc
PUBLIC
HEADING
City of Renton
Department of Community & Economic Development
PRELIMINARY REPORT TO THE HEARING EXAMINER
A. SUMMARY AND PURPOSE OF REQUEST:
Public Hearing Date:
November 17, 2009
Project Name:
Football Northwest Platform Lift
Applicant/Owner:
Football Northwest LLC, Attention: Lance Lopes, 12 Seahawks Way, Renton,
WA 98056
Contact:
Alan Foltz, Waterfront Construction, Inc., 205 NE Northlake Way, Suite 230,
Seattle, WA 98105
File Number:
LUA 09-134, ECF, SM, SMC Project Manager: Gerald Wasser,
Associate Planner
Project Description: The applicant has requested an Environmental Determination, approval of a
Shoreline Conditional Use Permit and a Shoreline Substantial Development
Permit for the installation of a pre -manufactured, freestanding platform
(boat) lift in association with an existing dock on Lake Washington, a
Shoreline of Statewide Significance. The proposed project is associated with
the Seattle Seahawks Headquarters and Training Facility on a 721,580 square
foot lot in the Commercial/Office/Residential (COR) Zone. The proposed
platform lift would be transported to the site by barge and positioned by a
barge -mounted crane. All work would take place within the established
construction window for this area (July 16 through December 31).
Project Location: 12 Seahawks Way
Exist. Structure Area: N/A Proposed New Structure Area: N/A
Site Area: 721,580 sf (16.56 ac) Total Building Area gsf: N/A
-0 0
City of Renton Deportment Ccutimuoity & Cconomic Development Prelimieory Report to the Heorioq Eruminer
Football Northwest Platform Lift LUA09-13.4, ECF, SMC, SM
Repert of November 17, 2p09 Page 2 of's
B. EXHIBITS:
Exhibit 1: Project file ("yellow file") containing the application, reports, staff comments, and
other material pertinent to the review of the project.
Exhibit 2:
Vicinity Map
Exhibit 3:
Zoning Map
Exhibit 4:
Plan View
Exhibit 5:
Detail View and Elevation View
Exhibit 6:
Platform Lift Assembly
Exhibit 7:
Determination of Non -Significance (DNS)
Exhibit S:
Shoreline Substantial Development Permit
C. GENERAL INFORMATION:
1. Owner of Record:
Football Northwest LLC, 12 Seahawks Way, Renton, WA 98056
2. Zoning Designation:
Commercial/Office/Residential (COR)
3. Comprehensive Pion
Commercial/Office/Residential (COR)
Land Use Designation:
4. Existing Site Use:
Seahawks Headquarters and Training Facility (Virginia Mason
Athletic Center [VMAC])
5. Neighborhood
Characteristics:
North: Misty Cove Condominiums, Commercial/Office/Residential
(COR) zoning
East: Railroad Tracks, Seahawks Way, Lake Washington Boulevard
North and 1-405 Freeway
South: Vacant, Commercial/Office/Residential (COR) zoning
West: Lake Washington
6. Access: Seahawks Way
7. Site Area: 721,580 sf (16.56 ac)
8. Project Data: Area comments
Proposed Platform (boat) Lift 200 sf 10 -feet wide by 20 -feet long
HEX Rpt. 09-134.doc
City of Renton Deportment Community & Economic Development
Football Northwest Platform Lift
Preiimmury Report to the Hearing Cxar7riner
LUA09-134, ELF, 5MC, SM
ReporL of November 17, 2009 Page .3 of 8
D. HISTORICAL/BACKGROUND:
Action
Land Use File No.
Ordinance No.
Date
Annexation
N/A
1823
04/21/1960
Comprehensive Plan
N/A
5100
11/01/2004
Zoning
N/A
5100
11/01/2004
Site Plan Review
LUA06-073
N/A
12/07/2006
Shoreline Substantial
LUA07-137
N/A
04/21/2008
Development Permit
Shoreline Substantial
LUA08-098
N/A
1/26/2009
Development Permit
E. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE:
1. Chapter 2 Land Use Districts
Section 4-2-020: Purpose and Intent of Zoning Districts
Section 4-2-070: Zoning Use Table
Section 4-2-120.13: Development Standards for Commercial Zoning Designations
2. Chapter 3 Environmental Regulations and Special Districts
Section 4-3-090: Shoreline Regulations
3. Chapter 4 Property Development Standards
Section 4-4-030; Development Guidelines and Regulations — General
4. Chapter 9 Procedures and Review Criteria
Section 4-9-190; Shoreline Permits
5. Chapter 11 Definitions
F. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN:
1. Land Use Element
2. Environmental Element
G. DEPARTMENT ANALYSIS:
I. PROJECT DESCRIPTION/BACKGROUND
The applicant's proposal is a request to install a freestanding, fully grated platform
(boat) lift at the northwest end of an existing dock on the shore of Lake Washington, a
Shoreline of Statewide Significance, at the Seahawks Headquarters. The platform lift
would be used by headquarters staff and may be used periodically by the public during
training seasons.
The platform lift would be 10 feet in width and 20 feet in length and would rest directly
on the lake bottom on four 12 -inch by 18 -inch footpads. The primary purpose of the
platform lift is to provide an intermediate level of safe boarding of smaller vessels when
the lake is at low water levels. The existing dock structure, with a deck level of 2 -feet, 6 -
inches above the Ordinary High Water Line (OHWL) is up to 4 -feet, 6 -inches above lake
HEX Rpt. 09-134.dac
L
City of Renton Deportment Community & Economic development Prelirninory Report to the Neorwg Examiner
Football Northwest Platform Lift LUA09-134, ECF, SMC, SM
Report of November 17, 2009 Page 4 of 8
leve] during approximately eight months of the year when the lake level is lowered by
the U.S. Army Corps of Engineers. The platform lifting mechanism uses hydraulic
cylinders, operated with a solar powered hydraulic pump system. The fully grated
decking of the platform lift allows light transmission to the lake. It would be at a low
profile to the water and existing dock and would not generate a reflection or visible
distraction to the surrounding area.
The upland area of the project site is zoned Commercial/Office/Residential (COR) which
implements the policies of the Commercial/Office/Residential Comprehensive Plan land
use policies.
The platform lift would be assembled offsite and transported to the site via construction
barge. Installation of the platform lift would be by a construction barge -mounted crane.
A portion of one day would be required to install the lift during the approved fish
window of July 16 through December 31.
2. ENVIRONMENTAL REVIEW
Pursuant to the City of Renton's Environmental Ordinance and SEPA (RCW 43.21C, 1971
as amended) on October 26, 2009 the Environmental Review Committee (ERC) issued a
Determination of Non -Significance (DNS) for the Football Northwest platform Lift. A 14 -
day appeal period ends on November 13, 2009. No appeals of the threshold
determination were filed as of the writing of this report.
3. STAFF REVIEW COMMENTS
Representatives from various city departments have reviewed the application materials
to identify and address site plan issues from the proposed development. These
comments are contained in the official file, and the essence of the comments has been
incorporated into the appropriate sections of this report and the Departmental
Recommendation at the end of the report.
4. CONSISTENCY WITH SHORELINE CONDITIONAL USE CRITERIA:
RMC Section 4-9-190.1 lists S criteria that the Hearing Examiner is asked to consider
when making a decision on a Shoreline Conditional Use application. These include the
following:
(1) The use must be compatible with other permitted uses within that area.
The applicant proposes to install a pre -manufactured, freestanding platform (boat) lift in
association with an existing dock at the Seattle Seahawks Headquarters and Training
Facility. This professional athletic facility is unique to this area and the platform (boat)
lift would be compatible with the existing use.
Boatlifts for residential projects in the vicinity of the Seahawks Headquarters and
Training Facility have been recently approved.
HEX Rpt. 09-134.doc
E
0
City of Renton Deportment Community & Economic development Prelrrmoury Report to the Heoring Exominer
Footbaff Northwest Platform Lift LVA09-134, ECF, SMC, SM
Report of November 17, 2009 Page 5 of 8
(2) The use will not interfere with the public use of public shorelines.
The proposed platform lift would be installed in association with an existing dock which
services the Seahawks Headquarters and Training Facility. It would provide safe
boarding of vessels using the dock when Lake Washington is at low water levels
approximately eight months of the year.
The Seahawks have dedicated a section of the shoreline to the north as public property
and are providing public access. This public access is along the northern property
boundary approximately 250 -feet to the north of the proposed project. The platform
lift would be installed in conjunction with the existing dock and would not interfere with
the public use of the shoreline.
(3) Design of the site will be compatible with the surroundings and the City's Master
Program.
The proposed pre -manufactured, freestanding platform lift would be installed in
association with the existing dock which services the Seahawks Headquarters and
Training Facility. It would be situated at a low profile to the water and the existing dock.
In that the facility is a unique use in this area and is located on a large parcel of land, it is
compatible with the surrounding area.
The City's Shoreline Master Program (WAC 173-26-230 b) states the design and
construction shall avoid or, if that is not possible, shall minimize and mitigate the
impacts to ecological functions, and critical areas resources. The proposed platform lift
is compatible with the objectives and policies of the City's Master Program as an
accessory water use to an existing commercial use. The platform lift would provide safe
accessibility to the existing dock especially when Lake Washington is at low water levels.
(4) The use shall be in harmony with the general purpose and intent of the City's
Master Program.
The City's Shoreline Master Program gives preference to uses which preserve the
natural character of the shoreline; result in long term over short term benefit; and,
protect the resources and ecology of the shoreline. Platform (boat) lifts provide a way
of securing watercraft to docks and would allow the dock to be used during the eight
months of the year when the lake is at low water levels. The proposed platform lift
would be fully grated (as is the existing dock) allowing light transmission to the lake.
This design would aid in the preservation of the natural character and would protect the
resources and ecology of the shoreline while resulting in long term benefit.
(5) The use meets the conditionol use criteria in WAC 173-27-350, to provide a
system within the Master Program, which allows flexibility in the applicotion of use
regulations in a manner consistent with the policies of RCW 90.58.020. in authorizing a
conditional use, special conditions may be attached to the permit by local government or
the department to prevent undesirable effects of the proposed use and/or to assure
consistency of the project with the act and the local master program.
(A) Uses which are classified or set forth in the application mosterprogramas
conditional uses may be authorized provided that the applicant demonstrates all
the following:
HEX Rpt. 09-134.doc
r 0
City of Heritoo Uepartrmeot Corormmity & Economic Development Preliminary Neport to NIE Nearing Examiner
Football Northwest Platform Lift LUA09-134_, ECF, SMC, SM
Report of November 17, 2009 page 0 of g
i) That the proposed use is consistent with the policies of RCW
90.58.020 and the master program. Lake Washington is classified as a
Shoreline of Statewide Significance. The state provides for the
management of shorelines of the state by planning for and fostering all
reasonable and appropriate uses which will promote the public interest.
The proposed platform lift would be installed in conjunction with an
existing dock. The installation of the platform lift would not affect public
access to the shoreline in this area of Lake Washington. Public access is
provided along the northern property boundary and would not change as
a result of this project. The proposed platform lift demonstrates
compliance with the policies of RCW 90.58.020 and the master program.
ii) That the proposed use will not interfere with the normal public use of
public shorelines. The subject site is commercial/office/residential private
property on the shore of Lake Washington. No interference with the
public use of public shoreline is anticipated to occur because the platform
lift would be located over water in conjunction with an existing dock.
Public access is provided on-site to the north.
iii) That the proposed use of the site and design of the project is
compatible with other authorized uses within the area and with uses
planned for the area under the comprehensive pian and shoreline master
program. The subject site is designated Commercial/Office/Residential in
the City's Comprehensive Plan and the proposed use qualifies as an
accessory use to the waterfront property. The proposed platform lift
would be installed in conjunction with an existing dock and would be
compatible in design to the adjacent lakefront properties and the
Shoreline Master Program as discussed previously,
iv) That the proposed use will cause no significant adverse effects to the
shoreline environment in which it is to be located. This section of Lake
Washington is designated as "Urban" Environment in the Shoreline
Master Program regulations and is a developed shoreline of commercial,
office and residential uses. If the proposed platform lift is installed and
maintained according to all required permits, the use is not expected to
cause significant adverse effects to the shoreline environment. This is
because the platform lift would be: fully grated allowing light
penetration; located in 10 -feet of water and approximately 130 -feet
beyond the Ordinary High Water Line (OHWL) which is well outside the
typical near shore juvenile salmonid migration corridor; operated using
non-toxic hydraulic fluid; and installed within the appropriate fish
window (July 16 through December 31).
v) That the public interest suffers no substantial detrimental effects.
A telephone call from a resident of the Misty Cove Condominiums in
opposition to the proposed project was received by staff. The caller
HEX Rpt. 09-134.doc
City of Rerrtori Deportment Community & Ccoilornic Development Prelimirmcry Report to the Hecmog Exorrwner
Football Northwest Platform Lift LUA09-134, ECF, SMC, SM
Report of November 11, 2009 Page 7 of 8
stated that the existing Seahawks Headquarters and Training Facility
building blocks views and light and that the proposed boatlift would
exacerbate this issue. The caller expressed that there was no need for a
boatlift for vessels using the existing dock. The comments received
regarding the existing facility are untimely. Because the proposed
platform lift would be raised and lowered during use and will be
maintained level with or below the height of the existing dock, it would
not impact views to the water from the Misty Cove Condominiums.
However, vessels raised and lowered by the platform lift will be above
the level of the dock for short periods of time.
The applicant indicates that the platform lift is necessary for safe
boarding of vessels, particularly when the lake is at low water levels
during eight months of the year. The platform lift would be at a low
profile to the water surface and the dock- Because the existing dock is
for day use of vessels visiting the Seahawks Headquarters and Training
Facility staff believes that any view obstruction to the surrounding area
would be short term and temporary. Therefore, no substantial
detrimental effects on shoreline views are anticipated.
(B) In the granting of all conditional use permits, consideration shall be given
to the cumulative impact of additional requests for like actions in the area.
Other shoreline conditional uses granted for the Lake Washington shoreline
have generally been for residential boat lifts. A Stream and Lake Study: Dock
Replacement, prepared by Cedarock Consultants, Inc., dated October 2, 2007
was submitted with the application for the existing dock. That study
evaluated the impacts of installing the existing dock- The applicant submitted
a Dock Platform Lift -- Stream and Lake Study Addendum, prepared by
Cedarock Consultants, Inc., dated October 9, 2009, which assesses the
potential impacts of the proposed platform lift. The analysis contained in the
Lake Study Addendum states that the design and location of the proposed
platform lift mitigate any cumulative impacts. Also, because the platform lift
would be installed in conjunction with an existing dock located on a large
parcel of property which contains a unique use in the area, the Seattle
Seahawks Headquarters and Training Facility, and that it would be
approximately 250 -feet from the nearest property boundary, the cumulative
impact of other conditional use permits plus the proposal is not considered to
result in detrimental effects to the shoreline environment.
(C) Other uses which are not classified or set forth in the applicable master
program may be authorized as conditional uses provided the applicant can
demonstrate consistency with the requirements of this section and the
requirements for conditional uses contained in the master program.
A platform (boat) lift is not a use set forth in the Shoreline Master Program.
Therefore, this project requires a Shoreline Conditional Use Permit. The
HEX Rpt. 09-134.doc
L J
•
City of Reirtoo Deportment Comrroility & Fcanomic Development Preliminary Report to the Nearing Fx(iminer
Football Northwest Platform Lift LUA09-134, ECF, SMC, SM
Report of November 17, 2049 Page 8 of 8
criteria discussed in this report have demonstrated the applicant's request is
consistent with the requirements.
(D) Uses which are specifically prohibited by the master program may not be
authorized pursuant to either subsection (A) or (B) of this section.
A platform lift is not specifically prohibited by the City's Shoreline Master
Program.
H. SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT
A Shoreline Substantial Development Permit is required for the proposed platform lift. The
following sections/pages of the Master Program are applicable to the development:
RMC Section Description Page
4-3-090J Urban Environment page 3-25
4-3-090.K. General Use Regulations for All Shoreline Uses Page 3-25
4-3-0901 Specific Use Regulations page 3-27
4-3-090.M. Variances and Conditional Uses page 3-39
4-9-190.1.1, 2, 3, 5 Variances and Conditional Uses Page 9-54
Pursuant to chapter 90.58 RCW, staff recommends that a Shoreline Substantial Development
Permit be granted subject to the following condition:
(1) The applicant shall comply with all construction conditions by the State agencies and all
construction conditions provided in the application and modifications submitted to the
City.
The Shoreline Substantial Development Permit for the Football Northwest Platform Lift project
is provided in Exhibit 8.
I. RECOMMENDATION:
Staff recommends approval of the Shoreline Conditional Use and Shoreline Substantial
Development Permits for the Football Northwest Platform Lift, Project File No. LUA09-134, ECF,
SMC, SM subject to the following condition:
1. The applicant shall comply with all construction conditions by the State agencies and all
construction conditions provided in the application and modifications submitted to the City.
HEX Rpt. 09-134.doc
EXHIBIT 2
PROJECT OESICNEO BY:
Waterfront Con5imcbon Inc.
THIS DOCUMENT IS PROPPoETARY PROPERTY OF WATERFRONT
CONSTRUCTON INC-, AND IS NOT TO DE USED. IN WHOLE OR IN KENMORE
PART.
FOR ANY OTHER PROJECT WITHOUT THE WRFTTEN
AUTHORIZATION OF WATERFRONT CONSTRUCTION INC. LAKE
FOREST
PARK
JUANITA
s 6iSth f GaQr 5t Y 4 3� s'pwq,� tis`
%r.*`J
—SC
72x17 _ r'y
KIRKLAND
BE 186 St �3
F M
s Q,TtdS` .� `l",-.����$r-,yl r� 'xSi� y� £ `' y�� W .'7�.,..:'•.
fes- NtEDINA
' A� 1 cam` kxy
n 7,5i''i�}. x < T •.
LLi ':•�-r::-' :-. .
i �s` j a1NAai1J�i�O�V
V.
t k x qhs }� vT Is§ a-s1 + fir BELLEVUE
1
` '' Y"L"-. -€'c �ilZ �,a�k�SxPi. ;``�iT-'w"-sz a"r�w(,.�5, �X� -- _ `� •:':•
� - t r ,� S}� �+ � �t� } r s� �� ass "% -,-A, v �� 4 A{?lih f 1 `•
VICINITY MAP/NO SCALE ::..
LEGAL DESCRIPTION -
1/4 SEC: SW 29--24N-05E
TAKLOT #: 292405 9015
292405 15 "BAXTER PARCEL NORTH" RENTON ' JOB
LUA-00--044 LLA REG NO 2001010590D005
WCH IS POR OF SW 1/4 29-24-05 LY WLYry SITE
P
OF ON RR CO R/W �ity l Rent
g Division
RENTON
�f( �/yh
� fU1V�� AREA MAP Scale.1--3mlles
LAT: 47' 32' 14"
LONG: -122' 11' 53"
PURPOSE:TO PROVIDE PLATFORM LIFT PROJECT NAME: PROPOSED: PROVIDE FREE STANDING FULLY
GRATED PLATFORM 'LIFT-
FOOTBALL NW LLC
DATUM: C.O.E. 0.0' EST 1919
4DJACENT OWNERS; REFERENCE:
MISTY COVE CONDOMINIUMS SITE LOCATION ADDRESS: IN: LAKE WASHINGTON
5021 RIPLY LN N NEAR: RENTON
RFNTON• WA 98056 12-SEAHAWKS WAY
FOOTBALL NW RENTON, 2924 59095056 COUNTY; KING STATE: -WASH INGTON
LAKE WAHiNGTON BLVD APPL BY: FOOTBALL NW LLC
RENTON, WA 98056 WG#: 07-32020.A-1.1 SHEET: 1 OF: 5 DATE: 10-7--09
EXHIBIT 3
C 10 R
C4 - 32 T24N R5E W I/Z
ZONING
P/D/FW TECHNICAL 9MVICE4
0212WO7
ti
c IfIl L
0tan
sion
(Dig
VED
LAsoo
29 T24N R5E W 1/2
PROJECT CESIGNED 6Y: EXHIBIT 4
Wa�c:rfrorr CorAru:tion Inc,
THIS DOCUMENT iS PROPRIETAZY PROPERTY OF WATERFRONT
CONSTRUCTuN ENC., AND IS NOT TO 8E USFO. IN WHOLE OR IN
PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN
AUTHORIZATION OF WATERFRONT CONSTRUCTION INC.
PRWECT DESIGNED BY.
Waterfrorrtconstruction Inc EXHIBIT 5
TH15 QOCLIUENT IS PROPRIETARY PROPERTY OE WATERFRONT
CONSTRUCTION INC., AND IS NOT TO 8E U5ED. iN WHOLE OR IN
PART, FOR ANY OTHER PROJECT WITHOUT THE WRITFEN
AUTHORIZATION OF WATERFRONT CONSTRUCTION INC.
PROJFCI DESIGNED BY
Watcr#fror+ Cors uc�on Inc,
THIS OOCUTAENT 15 PROPRETARY PROPERTY OF WATERFRONT
CONSTRUCTION M - . AND IS NOT TO BE USED. IN WHOLE OR IN
PART, FOR ANY OTHER PROJECT WITHOJT THE WRITTEN
AUTHORIZATION OF WATERFRONT CONSTRUCTION INC.
EXHIBIT 6
_.
w FF- n0
»ter
JI m 0
w UO
m
mU)
u7 x
OQw
w
Y
U O Q
C7
m < _
m Q �
Z O x
O �
LL'i
Z
z
O
U
J
M
m W
J
O
ILL)
Q L U
J 4
I-
Lio
Z
m p
O
D
n
rn
z w�
o
C
�o
ILS <0
o
> m
Lb
az p
m Z
� T
z F O
L° w
w
O n s
n x
Orn
Ln
0
z
g
0o
LlCDJ
"U
Ln
X'
w w
p
z x
Q N_x
N
cr F
Cf W^�
of
m =
q
c—
iD
'o
z
O
}O
wCO
��
w x
c�
O
I
w
w
[�J
a
lJ
Lj-J
ww
m� W
J}
m =
z
o¢v~i
om
o�
�V)s
O
o
3
Yuj N
00
Jw
W
J J
_
WF-'
F
Z
4
Q }� J
Q O
f b
p O
Z
Ll
a
_
LL
61F_ O
0 <
¢
O
to
Q `"
m
p0
ri
~ w p�
LL co
~ n
a
o
O
oa
a f'
w'
Y
�
o
I
r
�
CL d 'I m uj
>
w w
cr w
U
Le
F-
O
n
%
-
v W X K
� H m ww
w
m V
��
Z
W�
z
w
O
a
� wo m m w
a n
w n
mF
La
aQ
a_
0d
a
L5
Z:
i
no
s
_.
w FF- n0
»ter
JI m 0
w UO
m
mU)
u7 x
OQw
w
Y
U O Q
C7
m < _
m Q �
Z O x
O �
LL'i
Z
z
O
U
J
M
m W
J
O
ILL)
Q L U
J 4
I-
Lio
Z
m p
O
D
n
rn
z w�
o
C
�o
ILS <0
o
> m
Lb
az p
m Z
� T
z F O
L° w
w
O n s
n x
Orn
� �w
x
dpQ
Qom
"U
Ln
X'
w w
p
z x
Q N_x
Q�
Cf W^�
2
m =
q
c—
zoo
'o
z
1
LD
of
_.
w FF- n0
»ter
JI m 0
w UO
m
mU)
u7 x
OQw
w
Y
U O Q
C7
m < _
m Q �
Z O x
O �
LL'i
Z
z
O
U
J
M
m W
J
O
ILL)
Q L U
J 4
I-
Lio
Z
m p
O
D
n
EXHIBIT 7
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
ENVIRONMENTAL (SEPA) DETERMINATION OF NON -SIGNIFICANCE (DNS)
APPLICATION NUMBER: LUA09-134, ECF, SM, SMC
APPLICANT: Football NW LLC - Lance Lopes
PROJECT NAME: Football NW Platform Lift
DESCRIPTION OF PROPOSAL: The applicant has requested an Environmental Determination, approval
of a Shoreline Conditional Use Permit and a Shoreline Substantial Development Permit for the installation of a
pre -manufactured, freestanding platform (boat) lift in association with an existing dock on Lake Washington, a
Shoreline of Statewide Significance. The proposed project is associated with the Seattle Seahawks Headquarters
and Training Facility on a 721,580 square foot lot in the Commercial/Office/Residential (COR) Zone. The
proposed platform lift would be transported to the site by barge and positioned by a barge -mounted crane.
LOCATION OF PROPOSAL: 12 Seahawks Way
LEAD AGENCY: City of Renton
Environmental Review Committee
Department of Community & Economic Development
This Determination of Non -Significance is issued under WAC 197-11-340. Because other agencies of jurisdiction may be
involved, the lead agency will not act on this proposal for fourteen (14) days.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on November 13, 2009.
Appeals must be filed in writing together with the required fee with: Hearing Examiner, City of Renton, 1055 South
Grady Way, Renton, WA 98057. Appeals to the Examiner are governed by City of Renton Municipal Code Section 4-8-
110.B. Additional information regarding the appeal process may be obtained from the Renton City Clerk's Office, (425)
430-6510.
PUBLICATION DATE:
DATE OF DECISION:
SIGNATURES:
October 30, 2009
October 26, 2009
QA I
j. WPV,"V - f___
14&V & A24r4� /7-C /t) 9 2I 0
Gregg Zimmer&A�cl inistrator Date 1 41.avid Daniels, Admin��aistrator Dat
Public Works Dent Fire & Emergency Services
to
Terry Higashiyama, Administrator Date Alex Pi tsch, Adminis rator Date
Community Services Department Department of Community &
Economic Development
EXHIBIT 8
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT .:; V,
PLANNING DIVISION
SHORELINE MANAGEMENT ACT OF 1971
PERMIT FOR SHORELINE MANAGEMENT
EVALUATION FORM & DECISION
DATE OF PERMIT ISSUANCE:
LAND USE ACTION FILE NO.:
DATE RECEIVED
DATE OF PUBLIC NOTICE:
TYPE OF ACTION(S):
LUA09-134, ECF, SM, SMC
October 8, 2009
October 9, 2009
® Substantial Development Permit
® Conditional Use Permit
❑ Variance Permit
Pursuant to Chapter 90.58 RCW, staff recommends that the City of Renton grant a Shoreline
Substantial development Permit and a Shoreline Conditional Use Permit. This action is
proposed on the following application:
PROJECT NAME: Football Northwest Platform Lift
PROJECT MANAGER: Gerald Wasser, Associate Planner
OWNER/APPLICANT: Football Northwest LLC, 12 Seahawks Way, Renton,
WA 98056
CONTACT: Alan Foltz, Waterfront Construuction, Inc., 205 NE
Northlake Way, Suite 230, Seattle, WA 98105
PROJECT LOCATION: 12 Seahawks Way
LEGAL DESCRIPTION: See Attachment A
SEC-TWN-R: NE 1/4 Section 31, Township 24N, Range 5E
WITHIN THE SHORELINES OF: Lake Washington
APPLICABLE MASTER PROGRAM: City of Renton
PROPOSAL DESCRIPTION: The applicant has requested an Environmental
Determination, approval of a Shoreline Conditional Use Permit and a Shoreline Substantial
Development Permit for the installation of a pre -manufactured, freestanding platform (boat)
lift in association with an existing dock on Lake Washington, a Shoreline of Statewide
• i
City of Renton Department of Community & Economic Development Shoreline Management Permit
football Northwest Platform Lift LUA09-134, ECF, SM, SMC
DATE OF PERMIT: Page 2 of 3
Significance. The proposed project is associated with the Seattle Seahawks Headquarters and
Training Facility on a 721,580 square foot lot in the Commercial/Office/Residential (COR)
Zone. The proposed platform lift would be transported to the site by barge and positioned by
a barge -mounted crane. All work would take place within the established construction
window for this area of Lake Washington (July 16 through December 31).
The following section/page of the Master Program is applicable to the development:
RMC Section Description Page
4-3-090J Urban Environment 3-25
4-3-090K General Use Regulations for All Shoreline Uses 3-26
4-3-090L Specific Use Regulations 3-27
4-3-090M Variances and Conditional Uses 3-39
4-9-1901.1, 2, 3, 5 Variances and Conditional uses 9-54
Development of this project shall be undertaken pursuant to the following terms and
conditions:
1. The applicant shall comply with all construction conditions of State agencies.
This Permit is granted pursuant to the Shoreline Management Action of 1971 and pursuant to
the following:
1. The issuance of a license under the Shoreline Management Act of 1971 shall not release
the applicant from compliance with federal, state, and other permit requirements.
2. This permit may be rescinded pursuant to Section 14(7) of the Shoreline Management
Act of 1971 in the event the permittee fails to comply with any condition(s) hereof.
3. Construction permits shall not be issued until twenty-one (21) days after approval by
the Washington State Department of Ecology or until any review proceedings initiated
within this twenty-one (21) day review period have been completed.
L- 1 i���_��a'd'�Gd'tril , � ��cib,�`�bi�'�ii��1
C. E. "Chip" Vincent, Planning Director
Planning Division
Date
APPEALS: Appeals of Shoreline Substantial Development Permit issuance must be made
directly to the Shorelines Hearings Board. Appeals are made by filing a request in writing within
the twenty-one (21) days of receipt of the final order and concurrently filing copies of such
request with the Washington State Department of Ecology and the Attorney General's office as
9 0
City of Renton Department of Community & Economic Development Shoreline Management Permit
Football Northwest Platform Lift LUA09-134, ECF, SM, SMC
DATE OF PERMIT: Page 3 of 3
provided in section 18(1) of the Shorelines Management Act of 1971. All copies of appeal
notices shall also be filed with the City of Renton Planning Division and the City Clerk's office.
EXPIRATION: Unless a different time period is specified in the shoreline permit as authorized
by RCW 90.58.143 and subsection J1 of RMC 4-9-190, construction activities, or a use or
activity, for which a permit has been granted pursuant to this Master Program must be
commenced within two (2) years of the effective date of a shoreline permit, or the shoreline
permit shall terminate, and a new permit shall be necessary. However, the Planning Division
may authorize a single extension for a period not to exceed one year based on reasonable
factors, if a request for extension has been filed with the Planning Division before the
expiration date, and notice of the proposed extension is given to parties of record and the
Washington State Department of Ecology. DEFINITION OF COMMENCEMENT OF
CONSTRUCTION ACTIVITIES: the construction applications must be submitted, permits must be
issued, and foundation inspections must be completed before the end of the two (2) year
period.
Attachments:
A. Legal Description
B. Plan View
cc: Attorney General's office
Owner/Applicant-- Football Northwest LLC
Contact—Alan Foltz, Waterfront Construction, Inc.
City of Renton Offical File
9
9 AT TAc-H �q-v- &
LEGAL DESCRIPTION
BAXTER PARCEL SOUTH RENTON LUA-00-044 LUA REC NO 20010105900005 WCH IS POR OF SW 114
29-24-05 LY WLY OF BN RR CO RNV
BAXTER PARCEL NORTH RENTON LUA-00-044 LLA REC NO 20010105900005 WCH IS POR OF SW 1/4
29-24-05 LY WLY OF BN RR CO R/VV
0 0
PROJECT DESIGNED HY!
Warerfronl Construction Inc,
THIS DOCUMENT IS PROARIETARY PROPERTY OF WATER>-RONT
CONSTRUCTION INC., ANO IS NOT TO HE USED, IN WHCLE OR IN
PART, EOR ANr OTriER PROJECT WITHOUT THE WRITTEN
Farm WA -5 (6/76) File No.: NCS-236628-WA1
Commitment Face Page
Cady ��
t��c3�l�lflf� ��sJl�l�n
COMMITMENT FOR TITLE INSURANCEi3V itiQ9
Issued by
FIRST AMERICAN TITLE MSURANCE COMPANY
First American Title Insurance Company, herein called the Company, for valuable consideration, hereby
commits to issue its policy or policies of title insurance, as identified in Schedule A, in favor of the
proposed Insured named in Schedule A, as owner or mortgagor of the estate or interest covered
hereby in the land described or referred to in Schedule A, upon payment of the premiums and charges
therefor; all subject to the provisions of Schedules A and B and to the Conditions and Stipulations
hereof.
This Commitment shall be effective only when the identity of the proposed Insured and the amount
of the policy or policies committed for have been inserted in Schedule A hereof by the Company, either
at the time of the issuance of the Commitment or by subsequent endorsement.
This Commitment if preliminary to the issuance of such policy or policies of title insurance and all
liability and obligations hereunder shall cease and terminate six (6) months after the effective date
hereof or when the policy or policies committed for shall issue, whichever first occurs, provided that
the failure to issue such policy or policies is not the fault of the Company. This Commitment shall not
be valid or binding until countersigned by an authorized officer or agent.
IN WITNESS WHEREOF, the Company has caused this commitment to be signed and sealed, to
become valid when countersigned by an authorized officer or agent of the Company, all in -accordance
with its By-laws. This Commitment is effective as of the date shown in Schedule A as "Effective Date."
Exy�*'P
First American Title Insurance Company
`R�tiie
•caPap�•
By: President
'._ SEPTEMIEA 24, ? b
79EI ?
�A1IE60
Attest: Secretary
By: Countersigned
First American Title Insurance Company
Form WA -5 (6/76) File No.: NCS -236628 -WA>!
Commitment Page No. 1
First American Title Insurance Company
National Commercial Services
2101 Fourth Avenue, Suite 800, Seattle, WA 98121
(206)728-0400 - FAX(206)448-6348
Mike Cooper
(206)615-3107
mcooper@firstam.com
To: Vulcan
505 Fifth Avenue S, Suite 900
Seattle, WA 98104
Attn: Clint Chase
THIRD REPORT
SCHEDULE A
1. Commitment Date: October 05, 2007 at 7:30 A.M.
2. Policy or Policies to be issued:
Vincent Nguyenpham
(206)615-3267
vnguyenpham@firstam.com
File No.: NCS-236628-WA1
Your Ref No.: Baxter parcel
AMOUNT PREMIUM TAX
Standard Owner's Coverage $ To Follow $ $
Proposed Insured:
To Follow
3. The estate or interest in the land described on Page 2 herein is Fee Simple, and title thereto is
at the effective date hereof vested in:
Port Quendall Company, a Washington corporation
4. The land referred to in this Commitment is described as follows:
The land referred to in this report is descdt>ed in Exhibit "A" attached hereto.
FirstAmencan Title Insurance Company
0 _ _ i
Form WA -5 (6/76)
Commitment
EXHIBIT 'A'
LEGAL DESCRIPTION:
File Na; NCS-236628-WAl
Page No. 2
"BAXTER PARCEL NORTH" AND "BAXTER PARCEL SOUTH" OF CITY OF RENTON LOT LINE ADJUSTMENT NO.
LUA-00-044, RECORDED JANUARY 5, 2001 UNDER RECORDING NO. 20010105900005, IN KING COUNTY,
WASHINGTON.
First American irtle Insurance Company
Form WA -5 (6/76)
Commitment
• 0
SCHEDULE B - SECTION I
REQUIREMENTS
The following are the Requirements to be complied with:
Fife No.: NCS-236628-WAI
Page No. 3
Item (A) Payment to or for the account of the Grantors or Mortgagors of the full consideration for the
estate or interest to be insured.
Item (B) Proper instrument(s) creating the estate or interest to be insured must be executed and duly
filed for record.
Item (C) Pay us the premiums, fees and charges for the policy.
Item (D) You must tell us in writing the name of anyone not referred to in this Commitment who will
get an interest in the land or who will make a loan on the land. We may then make
additional requirements or exceptions
SCHEDULE B - SECTION 2
GENERAL EXCEPTIONS
-Me Policy or Policies to be issued will contain Exceptions to the following unless the same are disposed
of to the satisfaction of the Company.
A. Taxes or assessments which are not shown as existing liens by the records of any taxing
authority that levies taxes or assessments on real property or by the public records.
B. Any facts, rights, interest, or claims which are not shown by the public records but which could
be ascertained by an inspection of said land or by making inquiry of person in possession thereof.
C. Easements, claims of easement or encumbrances which are not shown by the public records.
D, Discrepancies, conflicts in boundary lines, shortage in area, encroachments, or any other facts
which a correct survey would disclose, and which are not shown by public records.
E. (1) Unpatented mining claims; (2) reservations or exceptions in patents or in acts authorizing the
issuance thereof; (3) Water rights, claims or title to water; whether or not the matters excepted
under (1), (2) or (3) are shown by the public records; (4) Indian Tribal Codes or Regulations,
Indian Treaty or Aboriginal Rights, including easements or equitable servitudes.
F. Any lien, or right to a lien, for services, labor, materials or medical assistance theretofore or
hereafter furnished, imposed by law and not shown by the public records.
G. Any service, installation, connection, maintenance, construction, tap or reimbursement
charges/costs for sewer, water, garbage or electricity.
H. Defects, liens, encumbrances, adverse claims or other matters, if any, created, first appearing in
the public records or attaching subsequent to the effective date hereof but prior to the date the
proposed insured acquires of record for value the estate or interest or mortgages thereon
covered by this Commitment.
First American Title Insurance Company .
Form WA -5 (6/76) File No.: NCS-236628-WAl
Commitment Page No. 4
SCHEDULE B - SECTION 2
(continued)
SPECIAL EXCEPTIONS
1. Lien of the Real Estate Excise Sales Tax and Surcharge upon any sale of said premises, if
unpaid. As of the date herein, the excise tax rate for the City of Renton is at 1.78%.
Levy/Area Code: 2151
For all transactions recorded on or after July 1, 2005:
• A fee of $10.00 will be charged on all exempt transactions;
• A fee of $5.00 will be charged on all taxable transactions in addition to the
excise tax due.
2. This item has been intentionally deleted.
3. This item has been intentionally deleted.
9. Facility Charges, if any, including but not limited to hook-up, or connection charges and
latecomer charges for water or sewer facilities of King County Water District No. 107 as disclosed
by instrument recorded April 1, 1981 under recording no. 8104010618.
5. Easement, including terms and provisions contained therein:
Recording Information: April 23, 1963 under Recording No. 5573335
In Favor of: Puget Sound Power and Light Company
For: Power line
Affects: as described therein
6. This item has been intentionally deleted.
7. Easement, including terms and provisions contained therein:
Recording Information: September 24, 1964 under Recording No. 5790408
In Favor of: Municipality of Metropolitan Seattle, its successors and assigns
For: A sewerline with all connections, manholes and appurtenances
Affects: as described therein
8. Easement, including terms and provisions contained therein:
Recording Information: December 15, 1964 under Recording No. 5823182
In Favor of: Puget Sound Power and Light Company, a Washington
corporation
For: Ingress and egress to tax parcel 12 across existing roadways
Affects: as described therein
First American Title Insurance Company
Form WA -5 (6/76)
Commitment
File No.: NCS-236628-WAI
Page No. 5
Easement, including terms and provisions contained therein:
Recording Information: December 15, 1964 under Recording No. 5823184
In Favor of: Puget Sound Power and Light Company, a corporation
For: The construction, maintenance, operation and repair of
submarine power cable
Affects: The Southwesterly portion of said premises
This easement is given to correct the description of that certain easement recorded April 23,
1963 under Recording No. 5573336, in Volume 4399 of Deeds, Page 461, records of King County
and will supersede and terminate said easement.
10. Easement, including terms and provisions contained therein:
Recording Information: December 15, 1964 under Recording No. 5823185
In Favor of: Puget Sound Power and Light Company, a corporation, its
successors and assigns
For: The construction, maintenance, operation and/or repair of
power lines
Affects: The Southerly and Southwesterly portion of said premises
11. Easement, including terms and provisions contained therein:
Recording Information: January 11, 1973 under Recording No. 7301110427
In Favor of: City of Renton, a municipal corporation
For: Public utilities (including water and sewer) with necessary
appurtenances
Affects: A portion of Northeasterly 10 feet of said premises
12. Easement, including terms and provisions contained therein:
Recording Information: October 8, 1975 under Recording No. 7510080739
In Favor of: City of Renton, a municipal corporation
For: Public utilities (including water and sewer) with necessary
appurtenances
Affects: as described therein
13. The terms and provisions contained in the document entitled "Land Use Agreement", exceuted by
and between J. H. Baxter & Co., a California corporation and Lakeside Associates, a limited
partnership and Ripley Lane Investments, a limited partnership, recorded January 7, 1980 as
Recording No. 8001070208 of Official Records.
14. The terms and provisions contained in the document entitled "Boundary Line Agreement",
exceuted by and between J. H. Baxter & Co., a California corporation and Lakeside Associates, a
limited partnership and Ripley Lane Investments, a limited partnership, recorded February 27,
1980 as Recording No. 8002270469 of Official Records.
Said instrument is a re-record of Recording No. 8001070207 recorded January 7, 1980.
First American Title Insurance Company
0
Form WA -5 (6/76)
Commitment
E
Fife No.: NCS-236628-WA1
Page No. 6
15. The terms and provisions contained in the document entitled "Agreement', exceuted by and
between J. H. Baxter & Co., a California corporation, its successors and assigns and The
Municipality of Metropolitan Seattle, a municipal corporation, its successors and assigns, recorded
November 3, 1981 as Recording No. 8111030611 of Official Records.
16. Covenants, conditions, restrictions and/or easements:
Recorded:
Recording No.:
February 15, 1996
9602150689
17. Conditions, notes, easements, provisions contained and/or delineated on the face of the Survey
recorded February 9, 2000 udder Recording No. 20000209900005, in King County, Washington.
18. Terms, covenants, conditions and restrictions as contained in recorded Lot Line Adjustment
(Boundary Line Revision) LUA-00-044-LLA :
Recorded: January 5, 2001
Recording Information: 20010105900005
19. Any question as to the true location of the lateral boundaries of the second class shorelands.
20. Any question that may arise due to the shifting and/or changing in the course of Lake
Washington.
21. Rights of the general public to the unrestricted use of all the waters of a navigable body of water
not only for the primary purpose of navigation, but also for corollary purposes; including (but not
limited to) fishing, boating, bathing, swimming, water skiing and other related recreational
purposes, as those waters may affect the tidelands, shorelands or adjoining uplands and whether
the level of the water has been raised naturally or artificially to a maintained or fluctuating level,
all as further defined by the decisional law of this state. (Affects all of the premises subject to
such submergence)
22
23
24.
This item has been intentionally deleted.
Evidence of the authority of the officers of Port Quendall Company, a Washington corporation, to
execute the forthcoming instrument, copies of the current Articles of Incorporation, By -Laws and
certified copies of appropriate resolutions should be submitted prior to closing
Title to vest in an incoming owner whose name is not disclosed. Such name must be furnished
to us so that a name search may be made.
First American Title Insurance Company
Form WA -5 (6/76) File No.: NCS-236628-WA1
Commitment Page No. 7
25. Unrecorded leaseholds, if any, rights of vendors and security agreement on personal property
and rights of tenants, and secured parties to remove trade fixtures at the expiration of the term.
26. General Taxes for the year 2007
Tax Account No.:
292405-9015-08
Amount Billed:
$
85,672.91
Amount Paid:
$
42,836.46
Amount Due:
$
42,836.45
Assessed Land Value:
$
7,829,100.00
Assessed Improvement Value:
$
1,000.00
(As to Baxter Parcel North)
27. General Taxes for the year 2007
Tax Account No.:
292405-9001-04
Amount Billed:
$
48,078.69
Amount Paid:
$
25,878.88
Amount Due:
$
22,199.81
Assessed Land Value:
$
4,393,700.00
Assessed Improvement Value:
$
0.00
(As to Baxter Parcel South)
2B. Easement, including terms and provisions contained therein:
Recording Information: May 21, 2007 under Recording No. 20070521001647
In Favor of: Puget Sound Energy, Inc.
For: Utility Systems
Affects: as described therein
FirstAmerican Title Insurance Company
Form WA -5 (6/76)
Commitment
_ INFORMATIONAL NOTES
File No.: NCS-236628-WAl
Page No. 8
A. Effective January 1, 1997, and pursuant to amendment of Washington State Statutes relating to
standardization of recorded documents, the following format and content requirements must be
met. Failure to comply may result in rejection of the document by the recorder.
Any sketch attached hereto is done so as a courtesy only and is not part of any title commitment
or policy. It is furnished solely for the purpose of assisting in locating the premises and First
American expressly disclaims any liability which may result from reliance made upon it.
C. The description can be abbreviated as suggested below if necessary to meet standardization
requirements. The full text of the description must appear in the document(s) to be insured.
Baxter Parcels North and South, LLA No. LUA-00-044, Rec No. 20010105900005
APN: 292405-9001-04
APN: 292405-9015-08
D. A fee will be charged upon the cancellation of this Commitment pursuant to the Washington
State Insurance Code and the filed Rate Schedule of the Company.
END OF SCHEDULE B
FirstQmerican Title Insurance Company
Form WA -5 (6/76)
Commitment
0.j d�vl�;ki
First American Title Insurance Company
National Commercial Services
COMMITMENT
Conditions and Stipulations
Fife No.: NCS-236628-WA1
Page No. 9
The term "mortgage" when used herein shall include deed of trust, trust deed, or other security
instrument.
2. If the proposed Insured has or acquires actual knowledge of a defect, lien, encumbrance,
adverse claim or other matter affecting the estate or interest or mortgage thereon covered by
this Commitment, other than those shown in Schedule B hereof, and shall fail to disclose such
knowledge to the Company in writing, the Company shall be relieved from liability for any loss or
damage resulting from any act or reliance hereon to the extent the Company is prejudiced by
failure to so disclose such knowledge. If the proposed Insured shall disclosure such knowledge
to the Company, or if the Company otherwise acquires actual knowledge of any such defect, lien,
encumbrance, adverse claim or other matter, the Company at its option, may amend Schedule B
of this Commitment accordingly, but such amendment shall not relieve the Company from liability
previously incurred pursuant to paragraph 3 of these Conditions and Stipulations.
3. Liability of the Company under this Commitment shall be only to the named proposed Insured
and such parties included under the definition of Insured in the form of Policy or Policies
committed for, and only for actual loss incurred in reliance hereon in undertaking in good faith
(a) to comply with the requirements hereof, or (b) to eliminate exceptions shown in Schedule B,
or (c) to acquire or create the estate or interest or mortgage thereon covered by this
Commitment. In no event shall such liability exceed the amount stated in Schedule A for the
Policy or Policies committed for and such liability is subject to the Insuring provisions, exclusion
from coverage, and the Conditions and Stipulations of the form of Policy or Policies committed for
in favor of the proposed Insured which are hereby incorporated by references, and are made a
part of this Commitment except as expressly modified herein.
4. Any claim of loss or damage, whether or not based on negligence, and which arises out of the
status of the title to the estate or interest or the lien of the Insured mortgage covered hereby or
any action asserting such claim, shall be restricted to the provisions and Conditions and
Stipulations of this Commitment.
First American Title Insurance Company
Form WA -5 (6/76)
Commitment
0 0
The First American Corporation
First American Title Insurance Company
National Commercial Services
PRIMACY POLICY
We Are Committed to Safeguarding Customer Information
File No.: NCS-236628-WA1
Page No. 10
In order to better serve your needs now and in the future, we may ask you to provide us with certain Information. We understand that you may be
concerned about what we will do with such information particularly any personal or financial information. We agree that you have a right to know how
we will utilize the personal information you provide to us. Therefore, together with our parent company, The First American Corporation, we have
adopted this Privacy Policy to govern the use and handling of your personal information.
Applicability
This Privacy Policy governs our use of the information which you provide to us. It does not govern the manner in which we may use Information we
have obtained from any other source, such as information obtained from a public record or from another person or entity. first American has also
adopted broader guidelines that govern our use of personal information regardless of its source. First American calls these guidelines its Fair
Information Values, a copy of which can be found on our website at www.firstam.com_
Types of Information
Depending upon which of our services you are utilizing, the types of nonpublic personal information that we may collect include:
Information we receive from you on applications, forms and in other communications to us, whether in writing, in person, by
telephone or any other means;
Information about your transactions with us, our affiliated companies, or others; and -
Information we receive from a consumer reporting agency.
Use of Information
We request information from you for our own legitimate business purposes and not for the benefit of any nonaffiliated party. Therefore, we w€ I not
release your information to nonaffiliated parties except: (1) as necessary for us to provide the product or service you have requested of us; or (2) as
permitted by law. We may, however, store such information indefinitely, including the period after which any customer relationship has ceased. Such
information may be used for any internal purpose, such as quality control efforts or customer analysis, We may also provide all of the types of
nonpublk personal information listed above to one or more of our affiliated companies. Such affiliated companies include financial service providers,
such as title insurers, property and casualty insurers, and trust and investment advisory companies, or companies involved in real estate services, such
as appraisal companies, home warranty companies, and escrow companies. Furthermore, we may also provide all the Information we collect, as
described above, to companies that perform marketing services on our behalf, on behalf of our affiliated companies, or to other financial institutions
with whom we or our affiliated companies have joint marketing agreements.
Former Customers
Even if you are no longer our customer, our Privacy Policy will continue to apply to you.
Confidentiality and Security
We will use our best efforts to ensure that no unauthorized parties have access to any of your information. We restrict access to nonpublic personal
information about you to those individuals and entities who need to know that information to provide products or services to you_ We will use our best
efforts to train and oversee our employees and agents to ensure that your information will be handled responsibly and in accordance with this Privacy
Policy and First American's Fair Information Values. We currently maintain physical, electronic, and procedural safeguards that comply with federal
regulations to guard your nonpublic personal information.
c 2001 The First American Corporation - All Rights Reserved
First Amerlcan Title Insurance Company
r 20070521001647.001
RETURN AI?i712J=SS:
Puget Sound Energy, Inc.
Atte: ROW Department (OW
PO BOX 90868 EST -06W
Bellevue, WA 98009-4888
EASEMENT
REFERENCE#;
GRANTOR: PORT QUENDALL COMPANY, a Washington corporation
GRANTEE: PUGET SOUND ENERGY, INC.
SHORT LEGAL: Section 28, Township 2", Range $E, SW Quarter
ASSESSOR'S PROPERTY TAX PARCEL: 292405.9015 and 292405-9001
For and In consWMtlon or One Dollar (51.00) and other valuable consideration In hand paid, (Orantae herein),
hereby convays and warrants to PUGET SOUND ENERGY, INC., a Washington Corporation r0ratMee" herein), .
for the purposes hereinafter Be (orth, a nonexclusive perpetual easement over, under, along across and through the
hAuMng described real properly CPropcdy' herein) in King County, Washinglom
BAXTER PARCEL NORTH AND BAXTER PARCEL SOUTH OF CRY OF RENTON LOT LINE
ADJUSTMENT LUA-OM44-LILA, AS RECORDED UNDER IGNG COUNTY RECORDING
No. 240101069D0005t SITUATE 1N THE SOUTiiWF.t4T QUARTER. OF SECTION 2.9,
TOWNSHIP 24 NORTHt RANGE 5 EAST W.M., 1N THR CITY OF RENTON, HMO COUNTY,
WASHINGTON.
Except as may be otherwise set hath herein Grantee's rights shall be exercised upon that portion of tha Property
('Easement Area" herein) described as an Easement Area tan (10) feet In width having five (5) feet of such width on
each side of a centerline dssWbed as follows;
THE CENTFRt,1NE OF GRANTEE'S FACILITIES AS NOW CONSTRUCTED, TO 13E CONSTRUCrM,
EXTENDED OR RELOCATED LYING WITHIN THE ABOVE DESCRIBED PARCEL
1. Purpose. Grantee shall have the right to use the Easement Area to cons"ol, operate, maintain, repair,
rapfaoe, improve, remove, and enlarge one Or more ul9lty systema for purposes of transmission, dlstrfbutlan and sale
of electricity. Such systems may incWo. but are not limited to:
a. Overhead faclilttes. Poles, towef& find o0w support structures vrith crossamts, braces.
guys and w3chors; electric Iransrrdssion and dlsIdbution lines; fiber optic table and othertines, cables
and fadlides for commw0callons: transformers, street lights, meters; fixtures, attachments and any and
all olhar fadlilles or appurtenances necessary or convenient to any or all of the foregoing; and.
b. Undergnourrd facilities. Conduits, Ones, cables, vaults, swit hes and transformers for
eleaMolly; flier optic cable and other lines, cables and faeftes for communications: semi -buried or
ground -mounted fadlitlez and pada, manholes, meters, fudures, attachments and any and all other
facilities or appurtenances necessary or convenlent to any or all orthe foregoing_
Following the initial construction of OR or a portion of its systems. Grantee may, from time to time, construct
such additional iaci088 eG it may require for such systems. Grantee shall have the right of access to the Easement
Area over and across the Property to enable Grantee to exorcise Its rigk is hareurtdar. Grantee shall compensate
Grantor for any damage to the Property caused by Tho a axdse of such right of access by Grantor.
2. Easement Area Clearing and Maintenance. Grantee shall have the right to cul, remove and dispose
of any and an brush, areas or othervegetallon In the IrasamentArea. Grantee shat also have the light to conlrolr fin
a continuing bask and by arty pnxient and reasonable means, the establishment and growth of bnmh, trees or other
vegetation In the Easement Area.
3. Trees Outside Easement Area. GrentCe shall have the tight to WL trim, remove and disposo or any,
trees located an the Property.outglge the Ea;s�'tA(A-6r+ea thgt.grb,old,-fD$.r ep�g�[q.jt ant,_Lrterfere with or
create a hazard to Grantee's systems. Grantee Shall, prior to tare exercise of such Mehl, Idan6fy such trees and
matte a reasonable ettart to give grantor prior notice Mal such trees will be CA trimmed, removed or disposed of
(except that Grantee shall have no ob6gallon to Identify such lace or give Grantor such prior notice when trees aro
CA trimmed, removed or otherwise disposed of In response to emergeney conditions). Grantor shall be entified to
no compensation for trees VA trimmed, removed or disposed Of except for the actual market value of merchantable
timber (if any) cut and removed from the Properly by Grantee.
Football s'lw
OEXGM TAX NOT REQII�p
HM1JG EbWlc r3ssernonll W2003
WO* 105043100/laS007250 Co.
RW -064107 %j .en,4 tt„
Page 1012
Y 20070521001647.002
4. Grantoea Use of Easement Area. Grantor reserves the right to use the Easement Area for any
purpose not inconsistent with the rights herein granted, provided, however, Grantor shag not oonstnrct or maintain
any bullrings, strictures or other objects on the Easement Area and Grantor shalt do rw blasting within 300 feet of
Grantee's facilldes vAihart Grantee's prior written consent.
5_ indemnity. Grantee agrees to Indemnify Grantor Nom and against liability incurred by Grantor as a
result of Grantees neg.genca In the exerclse of the It" herein granted to Grantee, but nothing herein shall taqulra
Grartee to indemnify Grantor for that portion of any such liatMly attributable to the negllgence of Grantor or the
nagligance of others.
8. Abandonment, The rights heretn granted shall continue until such time as Grantea ceases 10 use the
Easement Area for a period of thm (5) suooesslVe years, In which event, this ememard shell ternlnate and all rights
hereunder, and arty Improvements romalnhp in the Easement Area, short revert to or atherwtsa became the property
of Grantor, provided, however, VW no abandonment start be deemed to have occurred by reason of Grantee's
failure to irdllally Install its system an rhe Easement Area w" Any period of time from the date hereof,
T. Successors and Assigns. Grantee shall have the right to assign, apportion or otherwise transfer any
or all of its rights, benefits, privileges and interests arlsN►g in and under this easement Without limiting the
goneraldy of the foregoing, the rights and obligations of the parties shall Inure to the bonsfit of and be binding upon
their respective successors and asalgns.
DATED this IDS day of 2007.
GRANTOR:
PORT QUENDALL COMPAN ,e Washfngtoncorparadon
13Y_ //Li v
ITS:
STATE OF WASHINGTON)
. )ss
COUNTY OF KING }
On this day of 71147, before me, the undersigned, a Notary Public In
an pr the§tate of Washin m
on, duty commiasloned and swam, personally appeared
th
dk (7l art _. Jo my km" to be the person(s) who signed
as .Nf.i.tn' r?S� _ __ of PORT QUENDA.1, COMPANY, the
Washington oorporadon that exeouted the within and foregoing Instrument and acknowledged said instrument to be
1n�rf� free and voluntary act and dead and the tree and rot mh" aux and d�ieed of PORT QUENDAIL .
GOMPANY for the uses and purposes thereln mentioned; and on oath stated that a'L was authorized to
execute the said Inatrumemt on behalf of said PORT GUENDALL COMPANY.
IN WETNESS WHEREOF I have hereunto set my nd and offwiar seal the day and year first above written.
(56gnature of Notary)
(Print or stamp name of Notary)
d P M.
Footbalf NW
OMO Electac Easement 1012003
WO# 145041180 /185037250
RW-0e41a7
Page 2 of 2
NOTARY PUBLIC In and forth Site of
Washingtan, residing atm
W Appointment Esplres: t c7a l
2047052MI S47.DD1
200 �p05210Y 1647
R TtWAt7t7RESS: T "T' EN
ER6 Mee
Puget Sound Energy, Inc. �e� @ 11
Attn: ROW Department. (tliMFj KIHO GDUNTY, WR
PO BOX 90868 EST -06W
Bellevue, WA 98009-0860
EASEMENT
REFERENCE #:
GRANTOR: PORT OUMALL C01{iIPANY, a Washington corporation
GRANTEE: PUGET SOUND ENERGY, INC.
SHORT LEGAL: Seotlors 20, Township 24N, Runge BE, SW Quarter
ASSESSOR'S PROPERTYTAX PARCEL• 2924054015 and 292405-9047
For and In considera@on of One DOLar 67.00}'and other valuable consideration In hand paid, (•Grantor' herein),
hereby carways and warrants to PUM SOUND ENERGY, INC., a Washington Corporation CGrantee• hereln), ..
for the purposes hereinafter set forth, a nonexclusive perpetual easemard aver, under, along across and through the
fonawfng deaoribed real property CProperly"herein) In IXing County. Washirhgton:
BAXTER PARCEL NORTH AND BAXTER PARCEL SOUTH OP CRY OP PJ9170N LOT LINE
AOJUSTIdENT LUA-00-044-LLA, AS RECORDED UNDER VJNG COUNTY WORDING
No. 211010105900005, srruATE iN THE SOUTHWEST QUARTER OF SECMN 2B,
TowNsmp 24 NORTH, RANGE 5 EAST W.flfl., IN THE CITY 8F RENTON, KING COUNTY,
Except as may be otherwise set forth herein Grantee's rights shall be exarclsed upon that porkn of the Property
("Easement Area" hsrelnj described as an Easement Area ten (1 OJ feet In width having five (6) feet ofsuch width on
each side of a oentedfne described as fonows:
THE cEwrERumt OF GRANTEE'S FAcAuy ES As NOW CONRTRUCTEDr TO 13E CONSTRUCTED,
EXTENDED OR RELOCATED LYING WITHIN THE ABOVE OESCRwED PARCEL
1. Purpose, Grantee shall have the right to use the Easement Area to oxxrtruoi, operate, maintah, repair,
raplave, improve, remove, and enlarge one or more ul8ny syslems far purpo3ea of trenamissfon, dlstrlbution and sate
of electricity. Such ayatems may include, bW ere not limited to:
a. Overhead faalllffea. Poles, towers and other support slructum whh cmasarms, braces,
guys and enchors; eleobic transrdssion and dlstribulion lines; Ober optic cable and olherilnos, cables
and fariMles for COM0130108110rh3; Iransform$rs, straat lights, meters; fixtures, attachments and any and
aU olher fAdill ea or aplxrrlenances necessary or cnnvonient to arty or all of the forbgoira and.
b. Underground faattties. Conduits, fines, sabres, vauhs, aVAches and b tsforrnm for
elecWcI ; fiber optic table and other Imes, cebies and faciutles for communications; aml-buried or
gmund-mounted fadfOles and pada, manholes, meters. 8tmures, attachments and any and all other
facilities or appturfenar,om necessary or cotwentent to any or all of the foregoing..
Following the iat[tlal construction of an or a pmlon of its systems, Grantee may, from limts to bane, corwirud
such additional facilities ae it may require for such systems. - Grantee shall have the right of Dome to the Easement
Area over and across the Property to enable Grantee to axerciss its milts hereunder. Grarrles shall oo;mpensate
Granter for any damage to the Properly caused by the exercise of such right of atoess by Grantee.
2. Easement Area Clearing and Maintenance. Grantas shall have the right to out, remove and dispose
of any and ell brushtre
, es or otharvecelatlon In the Easement Area. Grantee shah also have the tight to control, on
a continuing baste and by any prudent and reasonable means, the eatsbrishnent and growth of bnuh, trees or other
vegetation to the Easement Area.
3. Trees Dufalde Fa3ementArea. Grantee shah have the right to" trim, remove and dlepose of any
trees located on the Property.cutWe the Ea;eWAL&ga.O;t-MId„1rj-(�ragl9p!§ $AV. .jtA 1p fit, Jnterfere with or
create a hazard to Grantee's systems. Grantee shall, price' to the exercise of such right, identify such trees and
make a reasonable effort to give Grantor prior notice that such trees will be tut, trimmed, removed or disposed of
(except that Grantee shall have no obligation to Identify such trees or give Grantor such prior nonce when frees are
cut, trimmed, removed or otherwise disposed of In response to emergency oonditions). Grantor shall be entitled to
no compensation for trees cut, trimmed, removed or disposed of except for the actual market value of merchantable
timber (if any) out and removed from the P"Tly by Grantee.
Footbell NW
OEXGM TAX NOT REQUIRED
HNG FaBGnG Easement 1t7120p3
WO#I05N3S O/IM7250 Co. rds
Page 1 of Y /J .
Mai By
— — T — 20=521001647,002
4. Grantor's Use of Easement Area. Grantor reservas the .right to Use the Easement Area for any
purpose not inconsistent with the rights hereln granted, Provided, however, Grantor shall not construct or maintain
any buildings, structures or other object% on the Easement Arca and Grantor shell do no blasting wMn 300 feet or
Grantee's facilities without Grantee's prior written consent.
S. Indemnity. Grarnae agrees to lndemnify Grantor from and agalnst liablifty Incurred by Grantor as a
result of Orarrtoe s negligence In the exercise of the rights herein gr&AW to Grantee• but m2hing heroin shell lequlre
Grantee to indemnify Grantor for that portion of any such liabtliy ettrfbutable to the negligence of Grantor or the
negfigence of others.
S. Abandonment. The rights herein granted shall continue until such time as Grantee ceases to use the
Easement Area for a pebod of fire (5) suxesa)ve years. In which event, this eassmsnt shell terminate and all rights
hereunder, and arty improvements remaining in the Easement Area, shall revert to or dharwiss beoome the property
of Grantor; provided, however, that no abandonment shat be dawned to have accurmd by resson of Grantee's
failure to initially Install its systems on the Easement Area YvWn any period of time from The dale hereof.
7. S uccessore and Assigns, Grantee shall have the right to assign, apportion or otherwise transfer tory
or all of its rights, benefits, privioges and Interests arlsing in and under this easement. Without limiting the
generality of the foregoing, the dWs and ob8gations of the psdles ehd0 Inure to the benefit of and be binding upon
their respective successor% and assigns,
DATED this day of 2007.
GRANTOFC
PORT QUENDALL COMPAN , a Washinglon corporation
BY_ Gip- �C
ITS: r f _ �-
STATE OJ: WASHINGTON)
)as
GOUNTYDFtUNG )
On thls � day of 2007, before me, the tarrderslgned, a Notary Public in
anr� iQr the tale of Washin on, duty eomadsODnea and swum, personally appeared
¢' CkIJP__to me known to be the person(s) who signed
8% -L'~f� of PORT QUENDAL]., COMPANY, the
Waeidngton owporedon Thal executed the within and foregoing instrument, and ackrloWedged sold Instrument to he
1�y-t, -- free and voirmiery act and dead and the free and voluntary act and Ord of PORT QUENDALL
GOIWPANY for the uses and purposes thereln mentioned; and on 061h slated that Sti y was authorized to
execule the said Instrument on behalfof said PORT QUENDALL COMPANY.
IN WITNESS WHEREOF 1 have hereunto set my nd and of lal seal the day and year first above written
(Signature of Notary
ti Sim 4Tc T—�a.�1 S
[Print or clamp riamb of N¢tary)
Football NW
OFUU(3 Electric Eagemer{ 1012003
VVM 1050431801185007250
RW -W4107
Page 2 ort
r""ft
NOTARY PU IWC In and for iqqq Stara of
Washington, reeidingat
M9 Appointment Exptresr _ \ � rib 1'0
0
CITY OF RENTON
DEPARTMENT OF COMMVNITY & ECONOMIC DEVELOPMENT - PLANNING DIVISION
'AFFIDAVITOF SERVICE BY MAILING
On the 28th day of October, 2009, 1 deposited in the mails of the United States, a sealed envelope containing
ERC Determination documents. This information was sent to-.
34, ECF, SM, SIVIC
Agencies
See Attached
Alan Foltz, Waterfront Construction Inc.
Contact
Football NW LLC - Lance Lopes
Owner/Applicant
(Signature ofSendeh:
STATE OFWASH |NGTON ) -
) SS
COUNTY OF KING
| certify that | know nrhave satisfactory evidence that Stacy M. Tucker
signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses and purposes
mentioned inthe instrument.
Datnd�
NoTary Public in anh6r the Sate of WAI�ISVOT-
ev
Notary (Phnd
appointment expires'
,x�`��/4
template - affidavit of service by mailing
F tball NW Platform Lift
34, ECF, SM, SIVIC
template - affidavit of service by mailing
a
AGENCY (DOE) LETTER MAILING
(ERC DETERMINATIONS)
Dept. of Ecology *
WDFW - Larry Fisher*
Muckle -shoot Indian Tribe Fisheries Dept.
Environmental Review Section
1775 12th Ave. NW Suite 201
Attn: Karen Walter or SEPA Revtewer
PO Box 47703
Issaquah, WA 98027
39015 —172'd Avenue SE
Olympia, WA 98504-7703
Auburn, WA 98092
WSDOT Northwest Region *
Duwamish Tribal Office *
Muckleshoot Cultural Resources Program
Attn_ Ramin Pazooki
4717 W Marginal Way SW
Attn: Ms Melissa Calvert
King Area Dev. Serv., M5-240
Seattle, WA 98106-1514
39015172 nd Avenue SE
PO Box 330310
Auburn, WA 98092-9763
Seattle, WA 98133-9710
US Army Corp. of Engineers *
KC Wastewater Treatment Division *
Office of Archaeology & Historic Preservation*
Seattle District Office
Environmental Planning Supervisor
Attn: Gretchen Kaehler
Attn: SEPA Reviewer
Ms. Shirley Marroquin
PO Box 48343
PO Box C-3755
201 S. Jackson ST, MS KSC-NR-050
Olympia, WA 98504-8343
Seattle, WA 98124
Seattle, WA 98104-3855
Boyd Powers *
Depart. of Natural Resources
PO Box 47015
Olympia, WA 98504-7015
KC Dev. & Environmental 5erv.
City of Newcastle
City of Kent
Attn: SEPA Section
Attn: Steve Roberge
Attn: Mr. Fred Satterstrom, AICP
900 Oakesdale Ave. SW
Director of Community Development
Acting Community Dev. Director
Renton, WA 98055-1219
13020 Newcastle Way
220 Fourth Avenue South
Newcastle, WA 98059
Kent, WA 98032-5895
Metro Transit
Puget Sound Energy
City of Tukwila
Senior Environmental Planner
Municipal Liaison Manager
Steve Lancaster, Responsible Official
Gary Kriedt
Joe Jainga
6200 Southcenter Blvd.
201 South Jackson Street KSC-TR-0431
PO Box 90868, MS: XRD-01W
Tukwila, WA 98188
Seattle, WA 98104-3856
Bellevue, WA 98009-0868
Seattle Public Utilities
Real Estate Services
Attn: SEPA Coordinator
700 Fifth Avenue, Suite 4900
PO Box 34018
Seattle, WA 98124-4018
*Note: If the Notice of Application states that it is an "Optional DNS", the marked agencies and cities
will need to be sent a copy of the checklist, Site Plan PMT, and the notice of application.
template - affidavit of service by mailing
City of �>—_11:
NIOTICE
OF ENVIRONMENTAL DETERMENATION AND PUBLIC HEARING
ISSUANCE OF A DETERMINATION OF NON -SIGNIFICANCE (DNS)
POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION
PROJECT NAME: Football NW Platform Lift
PROJECT NUMBER: LUA09-134, ELF, SNS, SMC
LOCATION: 12 Seahawks Way
DESCRIPTION: The applicant has requested an Environmental Review, Shoreline Conditional Use
Permit and a Shoreline SuLstantial Development Permit approval for the installation of a pre-manufacturfeE
freestanding platform IbaaQ lift in association with an existing dock on take Washington. The proposed project is
ociated with the Seattle Seahawks Headquarters and Trairime Facility on a 721,560 sq, ft. lot in the
Cammerci.I/Cffice/R'1Ldentiai (COR] Zone. The proposed platform lift would he transported to the site by barge
and positioned by a barge -mounted crane.
THE CITY OE RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC} HAS DETERMINED THAT THE
PROPOSED ACTION DOES NOT HAVE A SIGNIFICANT ADVERSE IMPACT ON THE ENVIRONMENT,
Appeals of the environmental determination must be filed in writing on or hefore 5:00 p.m. an November 13, 2009.
Appeals most be filed in writing together with the required fee with: Hearing Examiner, Cdy of Renton, 1055 South Grady
Way, Renton, WA 96057. Appeals to the Examiner are governed by City of Renton Municipal Code Section 4.6-110.0.
Additional information regarding the appeal process may be obtained from the Renton City Clerk's Office, (42S) 430-
6510.
A PUBLIC HEARING 'ldILL DE HLI-D BY THE RENTON HEAPING EXAMINER AT HIS REGULAR
MEETING IN THE COUNCIL CHAMBERS ON THE 7TH FLOOR OF CITY HALL, 1455 SOUTH GRALJY
VVAY, RENTON, 1h'ASHING70N, ON NOVEMBER 17, 2009 AT 9:00 AM TO CONSIDER THE
SHORELINE CONDITIONAL USE PFRN1IT AND SHORELINE SU65TANTIAL DEVFLCPMENT PERMIT,
IF THE ENVNONMFNTAL DETERMINATION IS APPEALED, THE APPEAL WILL BE HEARD AS PART OF
115 PUBLIC HEARING.
FOR FURTHER INFORMATION, PLEASE CONTACI THE CITY OF RENTON, DEPARTMENT OF
COMf41UNHY & ECONOMEC OEVELOPNIENTAT 1425( 43()-7200.
DO NOT REMOVE THIS NOTICE WITHOUT PROPER AUTHORIZATION
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE ID110TIFICATION.
CERTIFICATION
r 1
I4gLhereby certify that 3 co of thea d Um 11lIIf
01 I
Wv4erpoWver pome in sted by conspicuous places or nearby scrib y �{
1
DATE: SIGNED:
ATTEST: Subscribed and sworn before me. a Notary Public, in and for the State of Washington re.siding:in _�
rr.
on the day of }I" •`�``i�i,`
NOTARY PU LIC SIGN
0
OF ENVIRONMENTAL. DETERMINATION AND PUBLIC HEARING
ISSUANCE OF A DETERMINATION OF NON -SIGNIFICANCE (DNS)
POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION
PROJECT NAME: Football NW Platform Lift
PROJECT NUMBER: LUA09-134, ECF, 5M, SMC
LOCATION: 12 Seahawks Way
DESCRIPTION: The applicant has requested an Environmental Review, Shoreline Conditional Use
Permit and a Shoreline Substantial Development Permit approval for the installation of a pre -manufactured,
freestanding platform (boat) lift in association with an existing dock on Lake Washington. The proposed project is
associated with the Seattle Seahawks Headquarters and Training Facility on a 721,580 sq. ft. lot in the
Commercial/Office/Residential (COR) Zone. The proposed platform lift would be transported to the site by barge
and positioned by a barge -mounted crane.
THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERQ HAS DETERMINED THAT THE
PROPOSED ACTION DOES NOT HAVE A SIGNIFICANT ADVERSE IMPACT ON THE ENVIRONMENT.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on November 13, 2009.
Appeals must be filed in writing together with the required fee with: Hearing Examiner, City of Renton, 1055 South Grady
Way, Renton, WA 98057. Appeals to the Examiner are governed by City of Renton Municipal Code Section 4-8-110.13.
Additional information regarding the appeal process may be obtained from the Renton City Clerk's Office, (425) 430-
6510.
A PUBLIC HEARING WILL BE HELD BY THE RENTON HEARING EXAMINER AT HIS REGULAR
MEETING IN THE COUNCIL CHAMBERS ON THE 7TH FLOOR OF CITY HALL, 1055 SOUTH GRADY
WAY, RENTON, WASHINGTON, ON NOVEMBER 17, 2009 AT 9:00 AM TO CONSIDER THE
SHORELINE CONDITIONAL USE PERMIT AND SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT.
IF THE ENVIRONMENTAL DETERMINATION IS APPEALED, THE APPEAL WILL BE HEARD AS PART OF
THIS PUBLIC HEARING. _ ,;_�w,F..
FOR FURTHER INFORMATION, PLEASE CONTACT THE CITY OF RENTON, DEPARTMENT OF
COMMUNITY & ECONOMIC DEVELOPMENT AT (425) 430-7200.
DO NOT REMOVE THIS NOTICE WITHOUT PROPER AUTHORIZATION
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION.
9
Denis Law
Mayor
October 28, 2009
Alan Foltz
Waterfront Construction, Inc.
205 NE Nothlake Way #230
Seattle, WA 98105
L'Ak
iti of.-
-� _ -
t
;I
Department of Community & Economic Development
SUBJECT: ENVIRONMENTAL THRESHOLD (SEPA) DETERIMINATION
Football NW Platform Lift, LUA09-134, ECF, SM, SMC
Dear Mr. Foltz:
This letter is written on behalf of the Environmental Review Committee (ERC) and is to inform you that
they have completed their review of the environmental impacts of the above -referenced project. The
Committee, on October 26, 2009, decided that your project will be issued a Determination of Non -
Significance.
The City of Renton ERC has determined that it does not have a probable significant adverse impact on
the environment. An Environmental Impact Statement (EIS) is not required under RCW
43,21C.030(2)(c). This decision was made by the ERC under the authority of Section 4-6-6, Renton
Municipal Code, after review of a completed environmental checklist and other information, on file with
,the lead agency. This information is available to the public on request.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on
November 13, 2009. Appeals must be filed in writing together with the required fee with: Hearing
Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057. Appeals to the Examiner are
governed by City of Renton Municipal Code Section 4-8-110.13. Additional information regarding the
appeal process may be obtained from the Renton City Clerk's Office, (425) 430-6510.
A Public Hearing will be held by the Renton Hearing Examiner in the Council Chambers on the seventh
floor of City Hall, 1055 South Grady Way, Renton, Washington, on November 17, 2009 at 9:00 a.m. to
consider the Shoreline Conditional Use Permit and Shoreline Substantial Development Permit. The
applicant or representative(s) of the applicant is required to be present at the public hearing. A copy of
the staff report will be mailed to you prior to the hearing. If the Environmental Determination is
appealed, the appeal will be heard as part of this public hearing.
if you have any questions or desire clarification of the above, please call me at (425) 430-7382.
For the FnvironmentaI Review Committee,
C/, j5
Gerald C. Wasser
Associate Planner
cc: Football NW LLC / Owner
Renton City Half • 1055 South Grady Way • Renton, Washington 98057 • rentonwa.gov
Denis Law -1tY Of
Mayor
October 28, 2009 '" X
Department of Community & Economic Development
Washington State
Department of Ecology
Environmental Review Section
PO Box 47703
Olympia, WA 98504-7703
Subject: ENVIRONMENTAL (SEPA) DETERMINATION
Transmitted herewith is a copy of the Environmental Determination for the following project
reviewed by the Environmental Review Committee (ERC) on October 26, 2009:
DETERMINATION OF NON -SIGNIFICANCE
PROJECT NAME: Football NW Platform Lift
PROJECT NUMBER: LUA09-134, ECF, SM, SMC
LOCATION: 12 Seahawks Way
DESCRIPTION: The applicant has requested an Environmental Review, Shoreline
Conditional Use Permit and a Shoreline Substantial Development Permit approval for the
installation of a pre -manufactured, freestanding platform (boat) lift in association with an
existing dock on Lake Washington. The Proposed project is associated with the Seattle
Seahawks Headquarters and Training Facility on a 721,580 sq. ft. lot in the
Commercial/Office/Residential (COR) Zone. The proposed platform lift would be transported
to the site by barge and positioned by a barge -mounted crane.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on
November 13, 2009. Appeals must be filed in writing together with the required fee with: Hearing
Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057. Appeals to the Examiner are
governed by City of Renton Municipal Code Section 4-8-110.B. Additional information regarding the
appeal process may be obtained from the Renton City Clerk's Office, (425) 430-6510.
Please refer to the enclosed Notice of Environmental Determination for complete details. If you
have questions, please call me at (425) 430-7382.
For the Environmental Review Committee,
Gerald C. Wasser �
Associate Planner
Enclosure
cc: King County Wastewater Treatment Division Ramin Pazooki, WSDOT, NW Region
Boyd Powers, Department of Natural Resources Larry Fisher, WDFW
Karen Walter, Fisheries, Muckleshoot Indian Tribe Duwamish Tribal Office
Melissa Calvert, Muckleshoot Cultural Resources Program US Army Corp. of Engineers
Gretchen Kaehler, Office of Archaeology & Historic Preservation
Renton City Hall • 1055 South Grady Way • Renton, Washington 98057 • rentonwa.gov
0
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
City of
T
DETERMINATION OF NON -SIGNIFICANCE
ADVISORY NOTES
APPLICATION NO(S): LUA09-134, ECF, SM, SMC
APPLICANT: Lance Lopes, Football NW LLC
PROJECT NAME: Football NW Platform Lift
DESCRIPTION OF PROPOSAL: The applicant has requested an Environmental Review, Shoreline
Conditional Use Permit and a Shoreline Substantial Development Permit approval for the installation of
a pre -manufactured, freestanding platform (boat) lift in association with an existing dock on Lake
Washington, The proposed project is associated with the Seattle Seahawks Headquarters and Training
Facility on a 721,580 sq. ft. lot in the Commercial/Office/Residential (COR) Zone. The proposed
platform lift would be transported to the site by barge and positioned by a barge -mounted crane.
LOCATION OF PROPOSAL: 12 Seahawks Way
LEAD AGENCY: The City of Renton
Department of Community & Economic Development
Planning Division
Advisory Notes to Applicant:
The following notes are supplemental information provided in conjunction with the environmental
determination. Because these notes are provided as information only, they are not subject to the appeal
process for environmental determinations.
Planning:
1, Construction activities shall be restricted to the hours between 7:00 a.m. and 8:00 p.m., Monday through
Friday. Work on Saturdays shall be restricted to the fours between 9:00 a.m. and 8:00 p.m. No work shall
be permitted on Sundays.
ERC Advisory Notes Page 1 of 1
0 0
City of
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
ENVIRONMENTAL (SEPA) DETERMINATION OF NON -SIGNIFICANCE (DNS)
APPLICATION NUMBER:
LUA09-134, ECF, SM, SMC
APPLICANT: Football NW LLC - Lance Lopes
PROJECT DAME: Football NW Platform Lift
DESCRIPTION OF PROPOSAL: The applicant has requested an Environmental Determination, approval
of a Shoreline Conditional Use Permit and a Shoreline Substantial Development Permit for the installation of a
pre -manufactured, freestanding platform (boat) lift in association with an existing dock on Lake Washington, a
Shoreline of Statewide Significance. The proposed project is associated with the Seattle Seahawks Headquarters
and Training Facility on a 721,580 square foot lot in the Commercial/Office/Residential (COR) Zone. The
proposed platform lift would be transported to the site by barge and positioned by a barge -mounted crane.
LOCATION OF PROPOSAL: 12 Seahawks Way
LEAD AGENCY: City of Renton
Environmental Review Committee
Department of Community & Economic Development
This Determination of Non -Significance is issued under WAC 197-11-340. Because other agencies of jurisdiction may be
involved, the lead agency will not act on this proposal for fourteen (14) days.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on November 13, 2009.
Appeals must be filed in writing together with the required fee with: Hearing Examiner, City of Renton, 1055 South
Grady Way, Renton, WA 98057. Appeals to the Examiner are governed by City of Renton Municipal Code Section 4-8-
110.6. Additional information regarding the appeal process may be obtained from the Renton City Clerk's Office, (425)
430-6510.
PUBLICATION DATE:
DATE OF DECISION:
SIGNATURES:
October 30, 2009
October 26, 2009
QA
/(- vma )"n- 12-C 7 ld 0
Gregg Zimmer&4cl inistrator Date f I. avid Daniels, Administrator Date
Public Works enit Fire & Emergency Services
L Na 610 04 C'� �
Terry Higashiyama, Administrator Date Alex Pi tsch, Adminis rotor Date
Community Services Department Department of Community &
Economic Development
•
0
DEPARTMENT OF COMMUNITY p City °`
AND ECONOMIC DEVELOPMENT a
ENVIRONMENTAL REVIEW COMMITTEE
MEETING AGENDA
TO: Gregg Zimmerman, Public Works Administrator
Terry Higashiyama, Community Services Administrator
I. David Daniels, Fire & Emergency Services Administrator
Alex Pietsch, CED Administrator
FROM: Jennifer Henning, Current Planning Manager
MEETING DATE: Monday, October 26, 2009
TIME: 3:00 p.m.
LOCATION: Sixth Floor Conference Room #620
THE FOLLOWING IS A CONSENT AGENDA
Drofrak Apartments
(Timmons)
L UA 09-112, ECF, SA -H
Location: 12228 SE Petrovitsky Road. Description: The applicant is requesting Hearing Examiner Site
Plan Review and Environmental (SEPA) Review for the construction of a 3 -story, approximately 33 -foot
tall multi -family apartment building. The 19,889 square foot site is located within the Residential Multi -
Family (RMF) zoning designation. The proposed building would include 10,879 square feet of residential
space within 8 residential units. The applicant is requesting a parking modification in order to reduce
the number of parking spaces required; from 16 to 14 stalls. The 14 stalls would be located within a
surface parking lot west of the proposed building. Access to the site would be provided from SE
Petrovitsky Road via one curb cut. There are no critical areas located on site.
ACCES Renton (Arai)
LUA09-329, ECF
Location: 4208 Lind Avenue SW, Description: The applicant is requesting an Environmental Review to
change the use of a print shop to a veterinarian clinic on a 36,677 square foot site. The site consists of
an existing 7,275 square foot one-story building which would be retrofitted to meet the needs of a
satellite hospital location that provides specialty care and emergency veterinary services. There is no
proposed boarding of animals or long term care within the facility. The site is located within the
Commercial Office (CO) zoning designation. There are no critical areas located onsite.
ENVIRONMENTAL REVIEW COMMITTEE MEETING AGENDA
October 26, 2009
PAGE 2OF2
Football NW Platform & Soatlift (Wassel
LUA09-134, ECF, SM, SMC
Location: 12 Seahawks Way. Description: The applicant has requested an Environmental
Determination, approval of a Shoreline Conditional Use Permit and a Shoreline Substantial
Development Permit for the installation of a pre -manufactured, freestanding platform (boat) lift in
association with an existing dock on Lake Washington, a Shoreline of Statewide Significance. The
proposed project is associated with the Seattle Seahawks Headquarters and Training Facility on a
721,580 square foot lot in the Commercial/Office/Residential (COR) Zone. The proposed platform lift
would be transported to the site by barge and positioned by a barge -mounted crane.
cc: D. Law, Mayor
J. Covington, Chief Administrative Officer
S. Dale-Estey, CED Director
W. Flora, Deputy Chief/Fire Marshal
P. Hahn, Transportation Director
C. Vincent, CED Planning Director
N. Watts, Development Services Director
L. Warren, City Attorney
F. Kaufman, Hearing Examiner
D. Pargas, Assistant Fire Marshal
J. Medzegian, Council
0
DEPARTMENT OF COMMUNITY 5hl
AND ECONOMIC DEVELOPMENT I
ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC MEETING DATE: October 26, 2009
Project Name: Football Northwest Platform Lift
Owner: Football Northwest LLC, Attention: Lance Lopes, 12 Seahawks Way, Renton, WA
98056
Applicant. Same as owner.
Contact: Alan Foltz, Waterfront Construction, Inc., 205 NE Northlake Way, Suite 230,
Seattle, WA 98105
File Number:
Project Manager:
Project Summary:
LUA09-134, ECF, SM, SMC
Gerald Wasser, Associate Planner
The applicant has requested an Environmental Determination, approval of a
Shoreline Conditional Use Permit and a Shoreline Substantial Development Permit
for the installation of a pre -manufactured, freestanding platform (boat) lift in
association with an existing dock on Lake Washington, a Shoreline of Statewide
Significance. The proposed project is associated with the Seattle Seahawks
Headquarters and Training Facility on a 721,580 square foot lot in the
Commercial/Office/Residential (COR) Zone. The proposed platform lift would be
transported to the site by barge and positioned by a barge -mounted crane.
Project Location: 12 Seahawks Way
Exist. Bldg. Area SF:
Site Area:
STAFF
RECOMMENDATION:
N/A
Proposed New Bldg. Area (footprint)
Proposed New Bldg. Area (gross):
N/A
N/A
721,580 sf Total Building Area GSF: N/A
Staff Recommends that the Environmental Review Committee issue a
Determination of Non -Significance (DNS).
Project Location Map
09-134 ERC Report. doe
City of Renton Deportment of CommunitoEconomic Development E*nmentaf Review Committee Report
FOOTBALL NORTHWEST PLATFORM LIFT LUA09-134, ECF, SM, SMC
Report of October 26, 2009 Page 2 of 4
PART ONE: PROJECT DESCRIPTION / BACKGROUND
The applicant's proposal is a request to install a freestanding, fully grated platform (boat) lift at the
northwest end of an existing dock on the shore of Lake Washington, A Shoreline of Statewide Significance,
at the Seahawks Headquarters. The platform lift would be used by headquarters staff and may be used
periodically by the public during training seasons.
The platform lift would be 10 feet in width and 20 feet in length and would rest directly on the lake bottom
on four 12 -inch by 18 -inch footpads. The primary purpose of the platform lift is to provide an intermediate
level of safe boarding of smaller vessels when the lake is at low water levels. The existing dock structure,
with a deck level of 2 -feet, 6 -inches above the Ordinary High Water Line (OHWL) is up to 4 -feet, 6 -inches
above lake level during approximately eight months of the year when the lake level is lowered by the U.S.
Army Corps of Engineers. The platform lifting mechanism uses hydraulic cylinders, operated with a solar
powered hydraulic pump system. The fully grated decking of the platform lift allows light transmission to
the lake. It would be at a low profile to the water and existing dock and would not generate a reflection or
visible distraction to the surrounding area.
The upland area of the project site is zoned Commercial/Office/Residential (COR) which implements the
policies of the Commercial/Office/Residential Comprehensive Plan land use policies.
The platform lift would be assembled offsite and transported to the site via construction barge.
Installation of the platform lift would be by a construction barge -mounted crane. A portion of one day
would be required to install the lift.
A Stream and Lake Study: Dock Replacement, prepared by Cedarock Consultants, Inc., dated October 2,
2007 was submitted with the application for the existing dock. That study evaluated the impacts of
installing the existing dock. The applicant submitted a Dock Platform Lift — Stream and Lake Study
Addendum, prepared by Cedarock Consultants, Inc., dated October 9, 2009 which assesses the potential
impacts of the proposed platform lift. The assessment contained in this Addendum is discussed below.
PART TWO: ENVIRONMENTAL REVIEW
In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those
project impacts that are not adequately addressed under existing development standards and
environmental regulations.
A. Environmental Threshold Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible
Officials:
Issue a DNS with a 14 -day Appeal Period.
B. Mitigation Measures
No mitigation measures are proposed.
09-134 ERCReport.doc
City of Renton Deportment of Comm tin Aykonomic Development
FOOTBALL NORTHWEST PLATFORM LIFT
Report of October 26, 2009
C. Exhibits
Exhibit 1
Vicinity and Area Maps
Exhibit 2
Plan View
Exhibit 3
Detail View and Elevation View
Exhibit 4
Zoning Map
D. Environmental Impacts
AM,nmenta! Review Committee Report
LUA09-134. ECF. SM. SMC
Page 3 of 4
The Proposal was circulated and reviewed by various City Departments and Divisions to determine
whether the applicant has adequately identified and addressed environmental impacts anticipated to
occur in conjunction with the proposed development. Staff reviewers have identified that the proposal
is likely to have the following probable impacts:
1. Wildlife
Impacts: Impacts of replacing a previous dock with the existing dock on functions and values of the
lakefront, including near shore habitat, were evaluated in a Stream and Lake Study: Dock
Replacement, prepared by Cedarock Consultants, Inc., dated October 2, 2007. No mitigation
measures were proposed for that project (LUA07-137). A Dock Platform Lift — Stream and Lake
Study Addendum, prepared by Cedarock Consultants, Inc., dated October 9, 2009 was submitted by
the applicant. That addendum addresses the fact that the biological consultant reviewed the
impacts of the existing dock on water quality, organic nutrient input, microclimate, temperature
and shade, human access control, large woody debris recruitment, bank stability, fish migration
and wildlife habitat and concluded that there would be no significant differences with the addition
of the proposed platform lift. The addendum states that of most concern would be the potential of
the platform lift to interfere with fish migration. However, the proposed location in 10 feet of
water and approximately 130 feet beyond the Ordinary High Water Line (OHWL) places the
platform lift outside of the typical near shore juvenile salmonid migration corridor and, therefore,
any impact would be minimal. Furthermore, inwater work in the south end of Lake Washington is
limited by the U.S. Army Corps of Engineers to two short work windows, November 16 to
December 31 and July 16 to July 31. The installation of the proposed project would take place
within one of these work windows or as otherwise allowed by state or federal entities.
Mitigation Measures: No further mitigation is proposed.
Nexus: Not applicable.
E. Comments of Reviewing Departments
The proposal has been circulated to City Department and Division Reviewers. Where applicable, their
comments have been incorporated into the text of this report and/or "Advisory Notes to Applicant."
✓ Copies of all Review Comments are contained in the Official File and maybe attached to this
report.
Environmental Determination Appeal Process: Appeals of the environmental determination must be
filed in writing on or before 5:00 PM, November 13, 2009.
Renton Municipal Code Section 4-8-110.6 governs appeals to the Hearing Examiner. Appeals must be filed
in writing at the City Clerk's office along with the required fee. Additional information regarding the
09-134 ERCReport- doc
City of Renton Department of Comm unityoconomic Development Env mental Review Cornrnittee Report
FOOTBALL NORTHWEST PLATFORM LIFT LUA09-134, ECF, SM, SMC
Report of October 26, 2009 Page 4 of 4
appeal process may be obtained from the City Clerk's Office, Renton City Hall - 7th Floor, 1055 S. Grady
Way, Renton WA 98057.
ADVISORY NOTES TO APPLICANT
The following notes are supplemental information provided in conjunction with the
administrative land use action. Because these notes are provided as information only, they are not
subject to the appeal process for the land use actions.
Planning:
1. Construction activities shall be restricted to the hours between 7:00 a.m. and 8:00 p.m.,
Monday through Friday. Work on Saturdays shall be restricted to the hours between 9:00 a.m.
and 8:00 p.m. No work shall be permitted on Sundays.
09-134 ERC Report. doc
0
PROJECT DESEGNEO HY_
Wata froa Coma Amd l on Inc.
THIS DOCUMENT IS PROPRIETARY PROPERTY OF WATERFRONT
CONSTRUCTION INC., AND IS NOT TO BE USED, IN WHOLE OR IN
PART. FOR ANY OTHER PROJECT WITHOUT THE WRITTEN
AUT}tORIZATION OF WATERFRONT CONSTRUCTION INC.
Ijj
6 Lh at 5E SEL, 51to
zju 3151 Fr
DT1fSE 72W
U$S
Iri'.
.Dia -. Y A
T �
P Jc Ma) 4 eek
n� a '.
�71
v ;
:e.-��� -§
l-AKE� s
twt �IN
s ' WEXSf31�GTQ1J -, �
3.
M m � rs z ,y-!��tV ��'� ?ti-�d `� 'Yf• rr7gr+r _^ ii l.... -S 4 e{. 4 161 Si
VICINITY MAP/NO SCALE
LEGAL DESCRIPTION
1/4 SEC: SW 29 -24N -05E
TAKLOT #: 292405 9015
292405 15 "BAXTER PARCEL NORTH" RENTON
LUA-00-044 LLA REC NO 20010105900005P`
WCH IS POR OF SW 1/4 29-24-05 LY WILY City Of
OF AN RR CO R/W RI
LAT: 47' 32' 14"
LONG: —122' 11' 53"
PURPOSE: TO PROVIDE PLATFORM LIFT
DATUM: C.C.E. 0.0' EST 1919
ADJACENT OWNERS:
MISTY COVE CONDOMINIUMS
5021 RIPLY LN N
RENTON, WA 98056
FOOTBALL NW
LAKE WAHINGTON BLVD
RENTON, WA 98056
oLr -84!
lea
PROJECT NAME:
FOOTBALL NW LLC
REFERENCE #:
SITE LOCATION
12—SEAHAWKS WAY
RENTON, WA 9BO56
2924059015
07 -3202O -A— 1 .1
0
EXHIBIT 1
KENMORE
LAKE
FOREST
PARK
JUANITA
L L1
.:
J
MEDINA
w
u7
z T
LA
5
KIRKLAND
BELLEVUE
RENTON
k
N
I
JOB
S ITE
AREA MAP/Scale: 1 "=3miles
PROPOSED, PROVIDE FREE STANDING FULLY
"GRATED PLATFORM LIFT.
1N: LAKE WASHINGTON
NEAR;RENTON
COUNTY: KING STATE: WASHINGTON
APPL 9Y: FOOTBALL NW LLC
SHEET: 1 OF: 5 DATE: 10-7-09
PROJECT CESICNEo BY: 0
WaL.,rfrok Construction Inc EXHIBIT 2
THIS COMMENT IS MPRIETARY PROPERTY OF WATERFRONT
CONSTRUCTIONINC., AND IS NOT TO eC USED, IN WHOLE OR IN
PART F(1R ANY IITHFR PPfL,T WIT44
if[IT TLIr WRITTCN
PROJECT DESIGNED BY:
W-Acrfron� Con5tnciion Inc.
TPS DOCUMENT 15 PROPPoETARY PROPERTY DF WATERFRONT
CONSTRUCTION INC., ANDIS NOT TO SE USED, IN WHOLF VR IN
PART, FOR ANY OTTER PROJECT WITHOUT THE WRITTEN
AUTHORIZATION OF WATERFRONT CUNSTRUCTlON INC-
1 �\
a 0
xao
v7
aaz�
_
w
m
U
. o
�
4
er
a
o
X
0
m
0
=F
T
Q
_
Lo
-
U
- _
O
N
- -
J Of
u d
L-
O
C� Li
Z 4
K
u> C?
X
LI
auiz
X O J
UaO —
a V) 0
w L-
C) jc¢
d�L`a
0
Ir -
a
0
QLLI
J
D
m
o L
xao
aaz�
o_jw11
m
. o
er
a
o
0
m
N
T
Q
EXHIBIT 3
J O
j Z �
� U I
_z z 0
J
Q'
V h i Z C7
� l/7 cx�
D O O
z Z w
Z D` a t=17 Li
a o U 3 O
0 ofm ILLI
Y 4
ZH O I
d V) ~
E
R O a uj
LO 4Ll
i rte= _ _ •
EXHIBIT 4
LAKF--WA8RWl9T0F--.
XK-
R
CUR
rA - 32 TZAN ME W I/Z
A
Z.
N
-,
ZONING
4,
ZONING 3111kf-U MY TJ-ftl Dov
P/a/PW TECMCAL 8mvicm
02/Z&07 29 T24N R5E W YZ
q4z9l
0
City of Renton Department of Community & Economic Development
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT:
COMMENTS DUE: OCTOBER 23, 2009
APPLICATION NO: LUA09-134, ECF, SM, SMC
DATE CIRCULATED: OCTOBER 9, 2009
APPLICANT: Football NW, Lance Lopes
PLANNER: Jerry Wasser
PROJECT TITLE: Football NW Platform Lift
PLAN REVIEWER: Arneta Henninger
SITE AREA: 721,580 square feet
EXISTING BLDG AREA (gross): N/A
LOCATION: 12 Seahawks Way
PROPOSED BLDG AREA (gross) N/A
WORK ORDER NO: 78141
PLEASE RETURWfO JERRY WASSER I�,CURRENT PLANNING 6T" FLOOR
SUMMARY OF PROPOSAL: The ap licant has requested an Envir�me tal Determination, approval of a Shoreline Conditional Use
Permit and a Shoreline SubstantiI Development Permit for the inst ation of a pre -manufactured, freestanding platform (boat) lift
in association with an existing doc on Lake Washington, a Shor ne of Statewide Significance. The proposed project is associated
with the Seattle Seahawks Headqua s and Training F ' on a 721,580 square foot lot in the Commercial/Office/Residential
(COR) Zone. The proposed platform lift wou ransported to the site by barge and positioned by a barge -mounted crane. All
work would take place within the construction window established by the Washington Department of Fish and Wildlife.
A. ENVIRONMENTAL IMPACT (e.g. Non -Code) COMMENTS
Elementafthe Probable Probable More
Environment Minor Major information
Impacts Impacts Necessary
Earth
Air
Water
Plants
Land/Shoreline Use
Animals
Environmental Health
Energy]
Natural Resources
n lC(__
B. POLICY -RELATED COMMENTS
C. CODE -RELATED COMMENTS
Element of the Probable Probable More
Environment Minor Major Information
Impacts Impacts Necessary
Housing
Aesthetics
L ht/Glare
Recreation
Utilities
Transportation
Public Services
Historic/Cultural
Preservation
Airport Environment
10,000 Feet
14,000 Feet
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact
or areas where additional iatormation is needed to properly assess thi�.pFap�sal.
Signature of Director or Authorized Representative
Date
0 0
City of Renton Department of Community & Economic Development
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: { �,L(;
�' 'y'1
COMMENTS DUE: OCTOBER 23, 2009
APPLICATION NO: LUA09-134, ECF, SM, SMC
DATE CIRCULATED: OCTOBER 9, 2009
p
APPLICANT: Football NW, Lance Lopes
PLANNER: Jerry Wasser
NECE I VE D
PROJECT TITLE: Football NW Platform Lift
PLAN REVIEWER: Arneta Henninger
OCT 14 2009
SITE AREA: 721,580 square feet
EXISTING BLDG AREA (gross): N/A
BUILDING
LOCATION: 12 Seahawks Way
PROPOSED BLDG AREA (gross) N/A
WORK ORDER NO: 78141
SUMMARY OF PROPOSAL: The applicant has requested an Environmental Determination, approval of a Shoreline Conditional Use
Permit and a Shoreline Substantial Development Permit for the installation of a pre -manufactured, freestanding platform (boat) lift
in association with an existing dock on Lake Washington, a Shoreline of Statewide Significance. The proposed project is associated
with the Seattle Seahawks Headquarters and Training Facility on a 721,580 square foot lot in the Commercial/Office/Residential
(COR) Zone_ The proposed platform lift would be transported to the site by barge and positioned by a barge -mounted crane. All
work would take place within the construction window established by the Washington Department of Fish and Wildlife.
A. ENVIRONMENTAL IMPACT (e.g. Non -Code) COMMENTS
Element of the Probable Probable More
Environment Minor Major information
Impacts Impacts Necessary
Earth
Air
Water
Plants
Land/Shoreline Use
Animals
Environmental Health
Energyf
Noturol Resources
B. POLICY -RELATED COMMENTS
444f_
C. CODE -RELATED COMMENTS
1' lom
Element of the Probable Probable More
Environment Minor Major Information
Impacts Impacts Necessary
Housing
Aesthetics
Li ht Glare
Recreation
Utilities
Transportation
Public Services
HistoricfCulturol
Preservation
Airport Environment
IO, 000 Feet
14, 000 Feet
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact
or aregstvhere additional information is needed to properly assess this proposal.
re of DirrKtor or Authorized Represe
a �
Date
• i
City of Benton Department of Community & Economic Development
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: k ,r.
COMMENTS DUE. OCTOBER 23, 2009
APPLICATION NO: LUA09-134, ECF, SM, SMC
DATE CIRCULATED: OCTOBER 9, 2009
APPLICANT: Football NW, Lance Lopes
PLANNER: Jerry Wasser
PROJECT TITLE: Football NW Platform Lift
PLAN REVIEWER: Arneta Henninger
SITE AREA: 721,580 square feet
EXISTING BLDG AREA (gross): N/A
LOCATION: 12 Seahawks Way
PROPOSED BLDG AREA (gross) N/A
WORK ORDER NO: 78141
SUMMARY OF PROPOSAL: The applicant has requested an Environmental Determination, approval of a Shoreline Conditional Use
Permit and a Shoreline Substantial Development Permit for the installation of a pre -manufactured, freestanding platform (boat) lift
in association with an existing dock on Lake Washington, a Shoreline of Statewide Significance_ The proposed project is associated
with the Seattle Seahawks Headquarters and Training Facility on a 721,580 square foot lot in the Commercial/Office/Residential
(COR) Zone. The proposed platform lift would be transported to the site by barge and positioned by a barge -mounted crane. All
work would take place within the construction window established by the Washington Department of Fish and Wildlife.
A. ENVIRONMENTAL IMPACT (e.g. Non -Code) COMMENTS
Element of the Probable Probable More
Environment Minor Major information
Impacts Impacts Necessary
Earth
Air
Water
Plants
Land/Shoreline Use
Animals
Environmental Health
Energy/
Natural Resources
Element of the Probable Probable More
Environment Minor Major information
Impacts Impacts Necessary
Housing
Aesthetics
Li ht Glore
Recreation
Utilities
Transportation
Public Services
Historic/Cultural
Preservation
Airport Environment
10,000 Feet
14,000 Feet
B. POLICY -RELATED COMMENTS
C. CODE -RELATED COMMENTS
dYt/I G�
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact
or areas wdere additional inforr aabion is needed to properly assess this proposal.
Signature of Director or Authorized Representative
�L�-J? -02
Date
! •
City of Renton Deportment of Community & Economic Development
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT:l
COMMENTS DUE: OCTOBER 23, 2009
APPLICATION NO: LUA09-134, ECF, SM, SMC
APPLICANT: Football NW, Lance Lopes
DATE CIRCULATED: OCTOBER 9, 2009
PLANNER: Jerry Wasser R E C E I V E D
PROJECT TITLE: Football NW Platform Lift
PLAN REVIEWER: Arneta Henninger OCT 14 7009
SITE AREA: 721,580 square feet
LOCATION: 12 Seahawks Way
EXISTING BLDG AREA (gross): N/*;l III DING DIVISION
PROPOSED BLDG AREA (gross), N/A
WORK ORDER NO: 78141
SUMMARY OF PROPOSAL: The applicant has requested an Environmental Determination, approval of a Shoreline Conditional Use
Permit and a Shoreline Substantial Development Permit for the installation of a pre -manufactured, freestanding platform (boat) lift
in association with an existing dock on Lake Washington, a Shoreline of Statewide Significance. The proposed project is associated
with the Seattle Seahawks Headquarters and Training Facility on a 721,580 square foot lot in the Commercial/Office/Residential
(COR) Zone. The proposed platform lift would be transported to the site by barge and positioned by a Marge -mounted crane. All
work would take place within the construction window established by the Washington Department of Fish and Wildlife.
A. ENVIRONMENTAL IMPACT (e.g. Non -Code) COMMENTS
Element of the Probable Probable More
Environment Minor Major information
Impacts Impacts Necessary
Earth
Air
Water
Plants
Land/Shoreline Use
Animals
Environmentol Health
Energy/
Natural Resources
B. POLICY -RELATED COMMENTS
C. CODE -RELATED COMMENTS
Element of the Probable Probable More
Environment Minor Major Information
Impacts Impacts Necessary
Housin
Aesthetics
Li ht Glare
Recreation
Utilities
Transportation
Public Services
Historic/Cultural
Preservation
Airport Environment
10,000 Feet
14,000 Feet
We have reviewed this application with particular attention id'those areas in which we have expertise and have identified areas of probable impact
or areas where addition alinformation is needed to properly assess this proposal,
Signature of Director or Authorized Representative
Date
0 0
City of Renton Department of Community & Economic Development
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: }'
COMMENTS DUE: OCTOBER 23, 2009
APPLICATION NO: LUA09-134, ECF, SM, SMC
DATE CIRCULATED: OCTOBER 9, 2009
APPLICANT: Football NW, Lance Lopes
PLANNER: Jerry Wasser
PROJECT TITLE: Football NW Platform Lift
PLAN REVIEWER: Arneta Henninger
SITE AREA: 721,580 square feet
EXISTING BLDG AREA (gross): N/A
LOCATION: 12 Seahawks Way
I PROPOSED BLDG AREA (gross) N/A
WORK ORDER NO: 78141
SUMMARY OF PROPOSAL: The applicant has requested an Environmental Determination, approval of a Shoreline Conditional Use
Permit and a Shoreline Substantial Development Permit for the installation of a pre -manufactured, freestanding platform (boat) lift
in association with an existing dock on Lake Washington, a Shoreline of Statewide Significance. The proposed project is associated
with the Seattle Seahawks Headquarters and Training Facility on a 721,580 square foot lot in the Commercial/Office/Residential
(COR) Zone. The proposed platform lift would be transported to the site by barge and positioned by a barge -mounted crane. All
work would take place within the construction window established by the Washington Department of Fish and Wildlife.
A. ENVIRONMENTAL IMPACT (e.g. Non -Code) COMMENTS
Element of the Probable Probable More
Environment Minor Major Information
Impacts impacts Necessary
Earth
Air
Water
Plants
Lond/Shoreline Use
Animals
Environmental Health
Energy/
Natural Resources
S. POLICY -RELATED COMMENTS
r/_�/'V-L-
C. CODE -RELATED COMMENTS
Element of the Probable Probable More
Environment Minor Major Information
Impacts Impacts Necessary
Housing
Aesthetics
Li htfGlore
Recreation
Utilities
Transportation
Public Services
Historic/Cultural
Preservation
Airport Environment
10,000 Feet
14,000 Feet
We have reviewed this opplicotion with particular attention to those areas in which we have expertise and have identified areas of probable impact
or areas where additional information is needed to/properly assess this proposal.
Signature of Director or Authorized Representative
�Li
Date
0 0
City of Renton Department of Community & Economic Development
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPART ME
COMMENTS DUE: OCTOBER 23, 2009 CRY OFRENTON
APPLICATION NO: LUA09-134, ECF, SM, SMC
DATE CIRCULATED: OCTOBER 9, 2009
APPLICANT: Football NW, Lance Lopes
OCT Ni 2009
PLANNER: Jerry Wasser
PROJECTTITLE: Football NW Platform Lift
PLAN REVIEWER: Arneta Henninger BUILDING DIVISI
SITE AREA: 721,580 square feet
EXISTING BLDG AREA (gross): N/A
LOCATION: 12 Seahawks Way
PROPOSED BLDG AREA (gross) N/A
WORK ORDER NO: 78141
SUMMARY OF PROPOSAL: The applicant has requested an Environmental Determination, approval of a Shoreline Conditional Use
Permit and a Shoreline Substantial Development Permit for the installation of a pre -manufactured, freestanding platform (boat) lift
in association with an existing dock on Lake Washington, a Shoreline of Statewide Significance. The proposed project is associated
with the Seattle Seahawks Headquarters and Training Facility on a 721,580 square foot lot in the Commercial/Office/Residential
(COR) zone. The proposed platform lift would be transported to the site by barge and positioned by a barge -mounted crane. All
work would take place within the construction window established by the Washington Department of Fish and Wildlife_
A. ENVIRONMENTAL IMPACT(e.g. Non -Code) COMMENTS
Element of the Probable Probable More
Environment Minor Major Information
Impacts Impacts Necessary
Earth
Air
Water
Pian is
Land/Shoreline Use
Animals
Environmental Health
Energy/
Natural Resources
Aare
B. 1 POLICY -RELATED COMMENTS
C. CODE -RELATED COMMENTS
Q avii
Element of the Probable Probable More
Environment Minor Major Information
impacts Impacts Necessary
Housing
Aesthetics
Light/Glare
Recreation
Utilities
Trans ortotion
Public Services
Historic/Cultural
Preservation
Airport Environment
10,000 Feet
14,000 Feet
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact
or areas where additional in ormation is needed to properly assess this proposal.
AAIJAA r
Ve"1:31=11 I I Lwot-
Sign itur of Director or Authorized Representative Date
ON
0 0
City of Renton Department of Community & Economic Development
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: �� } t mil!
COMMENTS DUE: OCTOBER 23, 2009
APPLICATION NO: LUA09-134, ECF, SM, SMC
DATE CIRCULATED: OCTOBER 9, 2009
APPLICANT: Football NW, Lance Lopes
PLANNER: Jerry Wasser
PROJECT TITLE: Football NW Platform Lift
PLAN REVIEWER: Arneta Henninger
SITE AREA: 721,580 square feet
EXISTING BLDG AREA (gross): N/A
LOCATION: 12 Seahawks Way
PROPOSED BLDG AREA (gross) N/A
WORK ORDER NO: 78141
SUMMARY OF PROPOSAL: The applicant has requested an Environmental Determination, approval of a Shoreline Conditional Use
Permit and a Shoreline Substantial Development Permit for the installation of a pre -manufactured, freestanding platform (boat) lift
in association with an existing dock on Lake Washington, a Shoreline of Statewide Significance. The proposed project is associated
with the Seattle Seahawks Headquarters and Training Facility on a 721,580 square foot lot in the Commercial/Office/Residential
(COR) Zone. The proposed platform lift would be transported to the site by barge and positioned by a barge -mounted crane. All
work would take place within the construction window established by the Washington Department of Fish and Wildlife.
A. ENVIRONMENTAL IMPACT (e.g. Non -Code) COMMENTS
Elementof the Probable Probable More
Environment Minor Major information
Impacts Impacts Necessary
Earth
Air
Woter
Pian is
Land/Shoreline Use
Animals
Environments! Health
Energy/
Natural Resources
B. POLICY -RELATED COMMENTS
C. CODE -RELATED COMMENTS
Element of the Probable Probable More
Environment Minor Major information
Impacts impacts Necessary
Housing
Aesthetics
Li ht Glare
Recreation
Utilities
Transportation
Public 5ervices
Historic/Cultural
Preservation
Airport Environment
10,000 Feet
14,000 Feet
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact
or areas where additional information is needed to properly assess this proposal.
Signatu 74Dir ctor or Authorized Representative Date
CAV of
h1c
NOTICE OF APPLICATION AND PROPOSED DETERMINATION
OF NON -SIGNIFICANCE -MITIGATED (DNS -M)
DATE: Ocroher 9 2009
LAND Use NUMBER. LUA0�1'3a, ECF. Sh7, SfAC
PROJECT NAME'. Footba'I N.i� nt =latfom Lilt
PROJECT DESCRIPTION. Tne applicant has requested an Environmental Oelem„•,.tion. approves cF a
Siorelire Cgndlliona: Use ? n, II and a Shdrebre SJbst.nti.� Ueielopment Pil l for the iaslall?Iwn of a pre-
—irsoctured. `eeslandng oI,l m (boat) if i., assoc,aLe, ,wth an exstng dock an Lake �.v- rglurr a Shoreline of
Statewide Sig, lhcance the; ;-posed project is assoc,teed wiz. the Seattle Seahawks Roadquarlers ar.d Training Faulllly
or a 721,550 square fun! Int ,n ;ha Commercial'Ulhce'Revdenlial ICOR) Zone. The p-upaserl platform lift —.1c be
transported to the site by !,arga and oositianec by a barge -mounted crane. All -
All 71, IMke "I".. within :he
constructionmode. eslaal'st„_d by the 41'ashinoton Department of Fish are 117ildlife.
PROJECT LOCATIONS 12 Seanawks Way
OPTIONALDETERMINATION OF NON -SIGNIFICANCE, MITIGATED (Di As the Lead Agency. ;he City of Rel -
as determined that significant envhonmeutal impects a unhkefy to d5111 from the proposed project Therefore. s
milled uadcr the PC 4321C 110 the Cdy of Ren!., is wing the Cptioral DNS -M process to g... not— it,.[ a DNS -
h1 . likely to be sued ('era—ht ser ads.or the protect enc the proposed DNS -M are irtegmted Inrn a single comment
per did There wr. he „ cot period 101i rig theIssuance of Il,e threshold Determination of Non-Sign.ficance-
ivili ed ;UNS�) A 14 -day appeal p(, -OC V,111 III lire issuaoee of th.e ONS -M -
PERMIT APPLICATION DATE: O<:tnhar S. 2007
NOTICE OF COMPLETE APPLICATION. Oclaber 9, 20118
APPLICANTIPROJECT CONTACT PERSON, Alan Foltz, Walertront Construction, Ino.: Tei: (2061 548-9800
Pirl-F lReview Requested. Env mental (SEPAI Review, Shoreline Substantiae Development
P.—L. Shoreline Canthi nal Use Pe—ft
Other Permits which may be required: NA
Requested Studien Stream and Lake Study Addendum
Location where application may
be r—iiewod: Department of Community 8 Economic Development (CED) - Planning
Dlvlsinn, Sixth Floor Renton City Hall, 1055 South Grady Way, Renton- WA
98057
PUBLIC HEARING: Public howl.. I, lentalivehy scheduled for November 17, 2009 before the Renton
He. Hr„q Exa m Renton Coundl Chcmbers. Heanrgs hegrr, st 8 00 AV on
the 1,In Ilod of fee rew Re,tor Cl, 11.11 located ul 1055 &,,Wr G,ady (Nay.
CONSISTENCY OVERVIEW:
ZanenglLand Use. Ire ILI 1-11 is rleslg sated Ccm n—iall.OtTrc.111"ider lel on the Gdy of
Fenton Ccmpreh.—ve Land Use Map and Commerelaii0fi,ceiResldential or
the G i,'s Zoning Map
Environmental Documents that
Eval Jate the Proposed Proj.el Er ,rcnmerlal (SFPA1 Checks st
Development Ragulafrons
Used For Project Mitigation: Ihe project 'n+ll :re sonjv::l to me City orc
s SEPA inance, RMC 4-3-090, RMC 4.9-
1901 and olhcr a]olicaole cotes and regula4ar,s as appropriates.
I,
w
U
Proposed IV siRil Measures_ Tile fclluwirg Mltigaho„ fleasvres will i Leh .sed or, Ore proposed prolec:
Treses recommended Mirgstlon McbleIes address p-olect �mpects nes: covered
by exising codes and regulaWl as _ded above
•
Af 10-k WO ite aC:gr10 reed wnh;n rhe .vrnoo,v e !,,bushed by the 'rVa h!d9!r r, Depa or—I ar Fish
and bx+rdfde,
Comments on the above aPpiicallon must be submitted in writing to Gerald Wasser, Associate Planner, CED -
Plannir,y Division, 1x55 Seldh Grady Way, Renton, WA 98057, by 5:00 PM on October 23, 2009. This matter is
also tentatively scheduled for a public hearing on November 17, 2009. at 9:00 AM. Council Chaod:ers. S....h
Fleur, Revlon Citl°J
City Hal. 1055 South Grady ay, Revlon. If you are in;eresled in sttondirg rhe hearing, phase contact Pre
De—lopmenl Services Division to ensure that t8c hcarinp has -1 been resul¢culed a1 (4251 430-7282 If cnr,mentis
.n nothe svl•mdI:efu-etec m wrdmg by ;he date �rdicated III you may sl appear at :he hearing and present your con„ne„Is
it a I,-upusal t1 e HiExaminer. 1' you lave questions spew this proposal. 0r wish to be made a party of
rer;u:d hid re^..elves cduldi-al chlorination by rials, glosses contact tees out ma�naAer. Anyans who su5-',ils w'rillen
coc,c,ents w.11 aulunatoally became a party of record and will be notified of any decision on this project
CONTACT PERSON: Gerald Wasser, Associate Planner; Tel: (425) 430.7382
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION
If qnr. would like le be mads a party of record to -eceive further irrormation or, this proposed prnjecf, cowp!ele
this roan and return !m City of Renton, CED - Pianning Division. 10155 So. Grady Wuv, Rerlion, WA 98[1(7.
Nal Ic No Fnolha-. Nurmwes: Platicrrr LIrS'LUA09-134. LCF SM, %]MC
NA64E
MAI LIN3 ADDRESS.
TELEPHUN_n NO
CERTIFICATION
—,hereby certify that ,3 1
conspicuous places or nearby
r SIGNED
. � �_YNN (fir till
of the above d 7:= ,V 1:•
scribe
t y
ATTEST: Subscribed and sworn before me, a Notary Public, in and for the State of Washington residing in"i Q
1111P"t�+e111r�t`�
1 I,AS
k
on the �day of
NOTARY PU13LIC SIGN EIRE:
0
0
Agencies — NOA, Env. Checklist, PMT See Attached
Lance Lopes, Football NW — Accpt Ltr Only Owner
Alan Foltz, Waterfront Construction — Accpt Ltr Only Contact
Surrounding Property Owners - NOA only I See Attached
(Signature of Sender):
STATE OF WASHINGTON )
) Ss
COUNTY OF KING )
I certify that I know or have satisfactory evidence that Gerald C. Wasser
signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses an urposes
mentioned in the instrument.
Dated: b Q�d u
Notary Public in an f r the Sate of Washington
Notary (Print): IQrvtir u tntlt0 Yvth
M appointment expires: O
Y PP p Z-
-11D
template - affidavit of service by mailing
Football NW Platform Lift
LUAD9-134 ECF 5M SMC
template - affidavit of service by mailing
AGENCY (DOE) LETTER MAILING
(ERC DETERMINATIONS)
Dept. of Ecology *
WDFW - Larry Fisher*
Muckleshoot Indian Tribe Fisheries Dept.
Environmental Review Section
1775 12th Ave. NW Suite 201
Attn: Karen Walter or SEPA Reviewer
PO Box 47703
Issaquah, WA 98027
39015 —172nd Avenue SE
Olympia, WA 98504-7703
Auburn, WA 98092
WSDOT Northwest Region *
Duwamish Tribal Office *
Muckleshoot Cultural Resources Program
Attn: Ramin Pazooki
4717 W Marginal Way SW
Attn: Ms Melissa Calvert
King Area {}ev, Serv., MS -240
Seattle, WA 98106-1514
39015 172nd Avenue SE
PO Box 330310
Auburn, WA 98092-9763
Seattle, WA 98133-9710
US Army Corp. of Engineers *
KC Wastewater Treatment Division *
Office of Archaeology & Historic Preservation*
Seattle District Office
Environmental Planning Supervisor
Attn: Gretchen Kaehler
Attn: SEPA Reviewer
Ms. Shirley Marroquin
PO Box 48343
PO Box C-3755
201 S. Jackson ST, MS KSC-NR-050
Olympia, WA 98504-8343
Seattle, WA 98124
Seattle, WA 98104-3855
Boyd Powers *
Depart. of Natural Resources
PO Box 47015
Olympia, WA 98504-7015
KC Dev. & Environmental Serv.
City of Newcastle
City of Kent
Attn: SEPA Section
Attn: Steve Roberge
Attn: Mr. Fred Satterstrom, AICP
900 Oakesdale Ave. SW
Director of Community Development
Acting Community Dev. Director
Renton, WA 98055-1219
13020 Newcastle Way
220 Fourth Avenue South
Newcastle, WA 98059
Kent, WA 98032-5 89 5
Metro Transit
Puget Sound Energy
City of Tukwila
Senior Environmental Planner
Municipal Liaison Manager
Steve Lancaster, Responsible Official
Gary Kriedt
Joe Jainga
6200 Southcenter Blvd.
201 South Jackson Street KSC-TR-0431
PO Box 90868, MS: XRD-01W
Tukwila, WA 98188
Seattle, WA 98104-3856
Bellevue, WA 98009-0868
Seattle Public Utilities
Real Estate Services
Attn: SEPA Coordinator
700 Fifth Avenue, Suite 4900
PO Box 34018
Seattle, WA 98124-4018
*Note: If the Notice of Application states that it is an "Optional DNS", the marked agencies and cities
will need to be sent a copy of the checklist, Site Plan PMT, and the notice of application.
template - affidavit of service by mailing
r
334330288005
CROSETTO FRED A
5025 RIPLEY LN N
RENTON WA 98056
0 0
292405901508
PORT QUENDALL COMPANY
C/O VULCAN INC
505 5TH AV S #900
SEATTLE WA 98104
292405901201
PUGET SOUND ENERGY/ELEC
PROPERTY TAX DEPT
PO BOX 90868
BELLEVUE WA 98009
292405900203 334330300008 334330287502 "
QUENDALL TERMINALS THOMAS DAVID L+SUZANNE E WILLARD RICK+RENEE
PO BOX 477 5029 RIPLEY LN N 5031 RIPLEY LN N
RENTON WA 98055 RENTON WA 98056 RENTON WA 98056
City of
NOTICE OF APPLICATION AND PROPOSED DETERMINATION
OF NONSIGNIFICANCE -MITIGATED (DNS -M)
DATE: October 9, 2009
LAND USE NUMBER: LUA09-134, ECF, SM, SMC
PROJECT NAME: Football Northwest Platform Lift
PROJECT DESCRIPTION: The applicant has requested an Environmental Determination, approval of a
Shoreline Conditional Use Permit and a Shoreline Substantial Development Permit for the installation of a pre -
manufactured, freestanding platform (hoat) lift in association with an existing dock on Lake Washington, a Shoreline of
Statewide Significance. The proposed project is associated with the Seattle Seahawks Headquarters and Training Facility
on a 721,580 square foot lot in the CommerciailOfficelResidential (COR) Zone. The proposed platform lift would be
transported to the site by barge and positioned by a barge -mounted crane. All work would take place within the
construction window estabt,shed by the Washington Department of Fish and Wildlife.
PROJECT LOCATION: 12 Seahawks Way
OPTIONAL DETERMINATION OF NON -SIGNIFICANCE, MITIGATED (DiAs the Lead Agency. the City of Renton
has determined that significant environrnenial impacts are unlikely to result from the proposed project- Therefore, as
permitted under the RCW 43.21 C_110, the City of Renton is using the Optional Di process to give notice that a DNS -
M is likely to be issued. Comment periods for the project and the proposed DNS -M are integrated into a single cornment
period. There will be no comment period following the issuance of the Threshold Determination of Non -Significance -
Mitigated (DNS -M). A 14 -day appeal pericd will follow the issuance of the DNS -M.
PERMIT APPLICATION DATE: October S, 2009
NOTICE OF COMPLETE APPLICATION: October 9, 2009
APPLICANTIPROJECT CONTACT PERSON: Alan Foltz, Waterfront Construction, Inc.; Tet: (206) 548-9800
Permits/Review Requested: Environmental (SEPA) Review, Shoreline Substantial Development
Permit, Shoreline Conditional Use Permit
Other Permits which may be required: NIA
Requested Studies: Stream and Lake Study Addendum
Location where application may
be reviewed: Department of Community & Economic Development (CED) -- Planning
Division, Sixth Floor Renton City Halt, 1055 South Grady Way, Renton, WA
98057
PUBLIC HEARING: Public hearing is tentatively scheduled for November 17, 2409 before the Renton
}-fearing Examiner in Renton Council Chambers. Hearings begin at 9'00 AM on
the 7th floor of the new Renton City Hall located at 1055 South Grady Way.
CONSISTENCY OVERVIEW;
ZoninglLand Use: The subject site is designatedfl'ierVlal'Jffi&iReSidntiai on the City of
Renton Comprehensive Land Use Map and CommercifillOffIaeiResidential nn
the City's Zoning Map.
Environmental Documents that
Evaluate the Proposed Project: Environmental (SEPA) Checklist
Development Regulations
Used For Project Mitigation: The project will be subject to the City's SEPA ordinance, Ri. 4-3-090, RMC 4-9-
190i and other applicable codes and regulations as appropriate_
0
0
Proposed Mitigation Measures: The following Mitigation Measures will likely be imposed on the proposed project.
These recommended Mitigation Measures address project impacts not covered
by existing codes and regulations as cited above.
Aft work will be accomplished within the construction window established by the Washington Department of Fish
and Wildlife.
Comments on the above application must be submitted in writing to Gerald Wasser, Associate Planner, CED —
Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on October 23, 2009. This matter is
also tentatively scheduled for a public hearing on November 17, 2009, at 9:00 AM, Council Chambers, Seventh
Floor, Renton City Hall, 1055 South Grady Way, Renton. If you are interested in attending the hearing. please contact the
Development Services Division to ensure that the hearing has not been rescheduled at (425) 430-7282. If comments
cannot be submitted in writing by the date indicated above, you may still appear at the hearing and present your comments
on the proposal before the Hearing Examiner. If you have questions about this proposal, or wish to be made a party of
record and receive additional information by mail, please contact the project manager. Anyone who submits written
comments will automatically become a party of record and will be notified of any decision an this project,
CONTACT PERSON: Gerald Wasser, Associate Planner; Tel: (425) 430-7382
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION
If you would like to be made a party of record to receive further information on this proposed project, complete
this form and return to: City of Renton, CED — Planning Division, 1055 So. Grady Way. Renton, WA 98057.
NameiFile No.: Football Northwest Platform Lift/Li 34, ECF, SM, SMC
NAME
MAILING ADDRESS:
TELEPHONE NO.
Denis Law
Mayor
October 9, 2009
Alan Foltz
Waterfront Construction, Inc.
205 Northlake Way, Suite
Seattle, WA 98105
City
J
4
"IVV L
Department of Community & Economic Development
Subject: Notice of Complete Application
Football Northwest Platform Lift, LUA09-134, ECF, SM, SMC
Dear Mr. Foltz:
The Planning Division of the City of Renton has determined that the subject application is
complete according to submittal requirements and, therefore, is accepted for review.
It is tentatively scheduled for consideration by the Environmental Review Committee on
October 25, 2009. Prior to that review, you will be notified if any additional information is
required to continue processing your application.
In addition, this matter is tentatively scheduled for a Public Hearing on November 17, 2009 at
9:00 AM, Council Chambers, Seventh Floor, Renton City Hall, 1055 South Grady Way, Renton.
The applicant or representative(s) of the applicant are required to be present at the public
hearing. A copy of the staff report will be mailed to you prior to the scheduled hearing.
Please contact me at (425) 430-7382 if you have any questions.
Sincer ,
Gerald C. Wasser
Associate Planner
cc: Football Northwest LLC / Owner/Applicant
Renton City Hall 0 1055 South Grady Way • Renton, Washington 98057 • rentonwa.gov
City of Renton
LAND USE PERMIT
�lty Of Ronton
DiviSiOrt
MASTER APPLICATIORE
PROPERTY OWNER(S)
Football Northwest LLC
NAME: Attn: Lance Lopes
12 Seahawks Way
ADDRESS:
Renton, WA 98056
CITY: ZIP:
Agent: Alan Foltz
TELEPHONE NUMBER: 206-548-9800
APPLICANT (if other than owner)
NAME:
COMPANY (if applicable):
ADDRESS:
CITY:
TELEPHONE NUMBER:
CONTACT PERSON
Alan Foltz
NAME:
Waterfront Construction, Inc.
COMPANY (if applicable):
205 NE Northlake Way, Suite 230
ADDRESS:
Seattle 98105
CITY: ZIP:
TELEPHONE NUMBER AND EMAIL ADDRESS:
206-548-9800
foltz waterfrontconstruction.com
C:1Dncuments and SettingsWanlDesktopWy LettersTNW Platform Liftlmaster app.doc
PROJECT INFORMATION
PROJECT OR DEVELOPMENT NAME:
FNW Platform Lift
PROJECTIADDRESS(S)ILOCATION AND ZIP CODE:
12 Seahawks Way
KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S):
292405 9015
EXISTING LAND USE(S):
Virginia Mason Athletic Center, FNW LLC Facility
PROPOSED LAND USE(S):
Unchanged
EXISTING COMPREHENSIVE PLAN MAP DESIGNATION:
PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION
(if applicable)
EXISTING ZONING:
COR
PROPOSED ZONING (if applicable):
NIA
SITE AREA (in square feet):
NIA
SQUARE FOOTAGE OF PUBLIC ROADWAYS TO BE
DEDICATED:
NIA
SQUARE FOOTAGE OF PRIVATE ACCESS EASEMENTS:
NIA
PROPOSED RESIDENTIAL DENSITY IN UNITS PER NET
ACRE (if applicable)
N.A
NUMBER OF PROPOSED LOTS (if applicable)
NIA
NUMBER OF NEW DWELLING UNITS (if applicable):
NIA
PAJECT INFORMAT
NUMBER OF EXISTING DWELLING UNITS (if applicable):
N.A
SQUARE FOOTAGE OF PROPOSED RESIDENTIAL
BUILDINGS (if applicable):N/A
SQUARE FOOTAGE OF EXISTING RESIDENTIAL
BUILDINGS TO REMAIN (if applicable):NJA
SQUARE FOOTAGE OF PROPOSED NON-RESIDENTIAL
BUILDINGS (if applicable):N/A
SQUARE FOOTAGE OF EXISTING NON-RESIDENTIAL
BUILDINGS TO REMAIN (if applicable):N/A
NET FLOOR AREA ON NON-RESIDENTIAL BUILDINGS (if
applicable):N/A
NUMBER OF EMPLOYEES TO BE EMPLOYED BY THE NEW
PROJECT (if applicable):
i
ION contil%ed
PROJECT VALUE: $20,000.00
IS THE SITE LOCATED IN ANY TYPE OF
ENVIRONMENTALLY CRITICAL AREA, PLEASE
INCLUDE
SQUARE FOOTAGE (if applicable):
❑ AQUIFIER PROTECTION AREA ONE
❑ AQUIFIER PROTECTION AREA TWO
❑ FLOOD HAZARD AREA
sq, ft.
0 GEOLOGIC HAZARD
sq. ft.
❑ HABITAT CONSERVATION
sq. ft_
X SHORELINE STREAMS & LAKES
200sq_ ft.
❑ WETLANDS
sq. ft.
LEGAL DESCRIPTION OF PROPERTY
(Attach legal description on separate sheet with the following information included
SITUATE 1N THE SW QUARTER OF SECTION _29_, TOWNSHIP `24N_, RANGE
05EIN THE CITY OF RENTON, KING COUNTY, WASHINGTON
TYPE OF APPLICATION & FEES
List all land use applications being applied for:
1. Platform Lift Installation•
2. 4.
Staff will calculate applicable fees and postage: $
AFFIDAVIT OF OWNERSHIP
I, (Print Name/s} o declare under penalty of perjury under the laws of the State of Washington that I am (please check one) _the current
owner of the property involved in this application or—X the authorized representative to act for a corporation (please attach proof of authorization)
and that the foregoing statements and answers herein contained and the information herewith are in all respects true and correct to the best of my
knowledge am belief. ��,,� I �_
' I certify that I know or have satisfactory evidence that. L-{ 4,f,- W�F�
_ signed this instrument and acknowledge it to be hislhedtheir free and voluntary
act for the uses and purposes mentioned in the instrument.
ignature Ow resentati��NQ�
Q� ��t'b►y'�,� f Notary Public in and for the State of Washington
(Signature of Owner/Represe�Ab�G Y
^ -�,. 3. s10.
_. Notary (Print)K=(
My appointment expires:
CADocuments and SettingsWan\Desktop%My LetterslI NW Platform Liftlmaster app.doc - 2 -
J?
PROJECT NARRATIVEfi�'(;}fir _
Project: Football NW Fee Standing Fully Grated Platform Lift
Section SW 29, Township 24N, Range 05E
LAT: 47.537N LON:122.20W
Waterbody: Lake Washington, County. King
Parcel: 292405 9015 08 and 292405 9001
Land Use Permits Required: Shoreline Substantial Development Permit
Zoning:
and SEPA Determination
COR 1245 Ind, Heavy Industry
Proposed Activity: The addition / placement of one 10' wide by 20' long free
standing, fully grated platform lift at the northwest end of the
existing pier structure. The lift will allow an intermediate level
for safe boarding of smaller vessels when the lake is at low water
levels. The pier structure, with deck level at 2'-6" above OHW by
regulatory requirement, is up to 4'-6" above lake level during
approximately eight months of the year when the lake level is
lowered by the Corps of Engineers. See Permit Drawings.
Estimated Construction Cost: $ 20,000.00
Construction Access: All proposed construction (lift placement) is waterward of
Ordinary High Water OHW). The platform lift is to be fabricated
off site at contractor's facility, transported to the pier site by
Contractor's barge, and positioned at the northwest end of the
existing pier by barge mounted crane.
Applicant: Football Northwest, LLC
Attn: Lance Lopes, Vice President
Seattle Seahawks, FNW LLC
12 Scahawks Way
Renton, WA 98056
Mail to: Alan Foltz, Permit Coordinator
Waterfront Construction, Inc.
205 NE Northlake Way, Suite 230
Seattle, WA 98105
Foltzgwaterftontconstruction. cam
Date: October 7, 2009
`' +�IiJj,3jQ
is
Conditional Use Permit Justification
Football Northwest LLC Fully Grated Platform Lift -1p
Reasons to favor the proposed free standing fully grated platform lift are summated in its purpose.
-- Purpose of die lift will -allow a variable intermediate -level -for -safe -boarding -of smaller vessels -when -the lake
is at low water levels. The existing pier structure, with deck level at 2'-6" above OHW, directed by
regulatory requirement, is up to 4'-6" above lake level during approximately eight months of the year when
the lake level is lowered by the Corps of Engineers. In that the lifting mechanism, functioning with
contained hydraulic cylinders, operated with a solar powered hydraulic pump system, can position the fully
grated decking at any elevation from close to lake bottom to pier deck elevation, the platform can be
positioned for best safety locations of many uses. The platform will generally be positioned mid way
between dock deck height and water level to facilitate access to small boats temporarily moored to allow
people to move from small boats to the dock and land. For many months of the year this can be a precarious
transfer, expecially for seniors. The platform can offer a more secure tie for small vessels, or even float
planes should they seek temporary moorage for visitors.
With the platforms'fully grated decking, it offers the same light transmission as the fully decked pier
structure. In fact the material is identical. The platform lift is low profile to the water and pier, thus does not
generate a reflection or visible distraction to the neighborhood.
7. A: Comprehensive Plan
The purpose and objectives of the proposed platform lift are compatible with the General Purpose,
Objectives and Policies of the City of Renton... The continued protection of Renton's natural systems,
natural beauty, and environmental quality.
Policy EN -57 regulates sensitive areas through regulations addressing uses. The safety measure to
prevent damage to boats by mooring at compatible deck elevations, or persons from the danger of
falling when traversing elevations from small boats to the pier offers a major safety enhancement.
Policy EN60 encourages preservation through regulations which will provide for public health and
safety. The health and safety afforded by use of the platform lift as a transition from water based
vessels to the pier eliminates a safety hazard for approved visitors.
7. S: Purpose and Need
The proposed platform lift is an enhancement to the safety of water access/moorage to the pier.
This is most advantageous during the practice sessions and summer seasonal use of the facility.
7. C: Effect on Adjacent Properties
The primary purpose and safety benefits of the platform lift protect human safety. The platform
lift offers the most practical way to achieve safety. No effect to adjacent properties is anticipated.
The platform lift location maintains the conforming characteristics of the pier structure and does
not generate an encroachment concern.
The lift could not possibly block the view from neighboring properties. It would not interfere with
neighboring property water access, or neighboring enjoyment of the recreational uses of the lake.
CONSTRUCTION MITIGATION DESCRIPTION
Proposed Construction:
The addition / placement of one 10' wide by 20' long free
standing, fully grated platform lift at the northwest end of the
existing pier structure. The lift will allow an intermediate level
for safe boarding of smaller vessels when the lake is at low water
levels. The pier structure, with deck level at 2'-6" above OHW by
regulatory requirement, is up to 4'-6" above lake level during
approximately eight months of the year when the lake level is
lowered by the Corps of Engineers.
Installation Date: As permits allow. A portion of one day only will be
required to place the free standing lift. Lift to be pre
assembled/constructed off site.
Hauling, Delivery: Lift to be delivered by water with construction barge.
Minimization Measures: With the proposed delivery and placement of the
platform lift, there is no need to address negative dust,
traffic, erosion, mud, noise, delivery, or other noxious
characteristics.
Special Hours Proposed: None.
Preliminary Traffic
Control Plan: Not required.
Alan Foltz
Permit Coordinator
Waterfront Construction, Inc.
Agent for FNW LLC
r
FOSTER PEPPER,,,,
VIA FED -EX
Mr. Alan Foltz
Waterfront Construction
205 NE Northlake Way
Ste. 230
Seattle, WA 98105
Re: Baxter Property
Dear Mr_ Foltz- -
Direct Phone (206) 447-4676
Direct Facsimile (206) 749-1947
November 9, 2007 E -Mail PearRefoster-conn
Here is the updated title report, with the new Puget Sound Energy casement, plus the
older title report which has all the other easements affecting the Banter property.
Very truly yours,
FOSTER PEPPER PLLC
Roger A. Pearce
Enclosures
Tr.>~ 206.4= 7.4400 z-Ax.206.447.9700 111L THIRD AVENUE, SUITE 3400 SEATTLE, WASHINGTON 98101-3299 WWW FOSTER.COM
50a53602.1
F.ATT3.'P.wAqu4mir:Tnra.gPOYANFlDnP'TI ANT r
0
Alan Foltz
Page 1 of 1
°ity f
�r01;
------------
From: Roger Pearce [Pearn@foster-com]
Seat: Thursday, October 11, 2007 12:20 PM
To: Tom Chiado; Alan Foltz; lance Lopes; Roger Pearce
Subject: Baxter Property - Updated Title Commitment
Here is the updated title report for the Baxter Property that is currently being developed as the
Seahawks Corporate Headquarters and Practice Facility.
There is only one addition from the report the City received last year, a new PSE easement
(attached as Exception no. 28).
Feel free to send to the City of Renton, with or without the easement.
Note that Port Quendall Company, a Washington corporation, is still the fee simple owner.
The property is ground leased from Part Quendall Company to Lakefront Joint Venture LLC,
whose managing member is Football Northwest LLC (the Seabawks).
If the City needs signature from the property owner or lessor, we can either get them a Port
Quendall Company signature, or get them a notice of ground lease and a Lakefront Joint
Venture LLC signature.
Roger A. Pearce
Fos'1'ER PEPPER nLLC
I111 TTiird Avenue, Suite 3400
Seattle, WA 98101-3299
Phone: 206-447-4676
Mobile: 206-226-1623
Fax: 206-749-1997
earn -�,] oster_com
www.foster.com
, � F ()S`E'ER PEP13 E R
10/11/2007
Form WA -5 (61176)
Commitment Face Page
0
0
File No.: NCS-736528-WAI
COMMITMENT FOR TITLE INSURANCE
Issued by
FIRST AMERICAN TITLE INSURANCE COMPANY
First American Title Insurance Company, herein called the Company, for valuable consideration, hereby
commits to issue its policy or policies of title insurance, as identified in Schedule A, in favor of the
proposed Insured named in Schedule A, as owner or mortgagor of the estate or interest covered
hereby in the land described or referred to in Schedule A, upon payment of the premiums and charges
therefor; all subject to the provisions of Schedules A and B and to the Conditions and Stipulations
hereof.
This Commitment shall be effective only when the identity of the proposed Insured and the amount
of the policy or policies committed for have been inserted in Schedule A hereof by the Company, either
at the time of the issuance of the Commitment or by subsequent endorsement.
This Commitment if preliminary to the issuance of such policy or policies of title insurance and all
liability and obligations hereunder shall cease and terminate six (6) months after the effective date
hereof or when the policy or policies committed for shall issue, whichever first occurs, provided that
the failure to issue such policy or policies is not the fault of the Company. This Commitment shah not
be valid or binding until countersigned by an authorized officer or agent.
IN WITNESS WHEREOF, the Company has caused this commitment to be signed and sealed, to
become valid when countersigned by an authorized officer or agent of the Company, all in accordance
with its By -Laws. This Commitment is effective as of the date shown in Schedule A as "Effective pate."
By: .f.,e4-- Countersigned
First American Title Insurance CompanY
FirstAlmericaii fele assurance Companir
T
By: President
'. SE71l A.1[12c. � s
Attest: Secretary
By: .f.,e4-- Countersigned
First American Title Insurance CompanY
Farm WA -5 (6176)
Commitment
0
i
F.� AAf�:kJ
FirstAmerican ride Insurance Company
National Commercial Services
2101 Fourth Avenue, Suite 800, Seattle, WA 98121
(206)728-0400 - FAX(206)448-6348
Mike Cooper
(206)615-3107
mcooper@firstam.corn
To: Vulcan
505 Fifth Avenue S, Suite 900
Seattle, WA 98104
Attn: Clint Chase
I.
2.
3.
4.
THIRD REPORT
SCHEDULE A
Commitment Date: October 05, 2047 at 7:30 A.M.
Policy or Policies to be issued:
File No.: NCS-236628-WAI
Page No. 1
Vincent Nguyenpham
(206)615-3267
vnguyenpham@firstarn.com
File No.: HCS-236628-WA1
Your Ref No.: Banter parcel
AMOUNT PREMIUM TAX
Standard Owner's Coverage $ To Follow $
Proposed Insured:
To Follow
The estate or interest in the land described on Page 2 herein is Fee Simple, and title thereto is
at the effective date hereof vested in:
Fort Quendali Company, a Washington corporation
The land referred to in this Commitment is described as follows:
The land referred to in this report is described in Exhibit "A" attached hereto.
First American Tyle Insurance Company
0 Q 00 ---------AGENCY USE ONLY
.............
Us Army Corps ' Date received;
WASHINGTON STATE °„, Qi¢�
Joint Aquatic Resources P&"'�
Application (JARPA) Form lir r � fo
'l/i8lOrl Agency reference #:
#(s):
'
USE BLACK OR BLUE INF( TO ENTER ANSWERS IN WHITE SPACES BELOW. f'L �� i Tax Parcel,
77ffjj�C i
zoo,
Part 'I—Project Identification
Unique project information that makes it easy to IdenqW Vli_�v_ l�� ---------------------------------------
1a. Unique Project Identifier Number (UPI #)heipa
• Don't have one yet? Get one at hftp://www.epermitting.wa.gov or call the Washington Governor's Office of Regulatory Assistance
at (800) 917-0043.
902193-09-01
I b. Project Name (Examples: Smith's Dock or Seabrook Lane Development)[t@jPJ
Football Northwest LLC Platform Lift
Part 2—Applicant
The person or organization legally responsible for the project.h[ i
2a. Name (Last, First, Middle) and Organization (if applicable)
Football Northwest LLC, Attn, Lance Lopes
2b. Mailing Address (street or PO Box)
12 Seahawks Lane
2c. City, State, Zip
Renton, WA 98056
2d. Phone (1)
2e. Phone (2)
2f. Fax
2g. E-mail
( 425-203-8000 )
( }
( }
foitz@waterfrontconstruction,com
Part 3—Authorized Agent or Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b. of this
application.) LbLeM
3a. Name (Last, First, Middle) and Organization (if applicable)
Foltz, Alan D. , Waterfront Construction, Inc.
3b. Mailing Address (Street or Po Box)
205 NE Northlake Way, Suite 230
3c. City, State, Zip
Seattle, WA 98105
3d. Phone (1)
3e. Phone (2)
3f. Fax
3g, E-mail
( 206 ) 548-9800
( }
( 206) 548-1022
foitz@waterfrontconstruction,com
JARPA 2009 Page 1 of 11
Part 4 --Property Owner( hel
Contact information for people or organizations owning the property(ies) where the project will occur.h[ jp]
® Same as applicant. (Skip to Part 5.)
❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.)
❑ There are multiple property owners. Complete the section below and use DARPA Attachment A for each
additional property owner.
4a. Name (Last, First, Middle) and Organization (if applicable)
12 Seahawks Lane, (Formerly 5015 Ripley Lane)
4b. Mailing Address (Street. or PO Boit)
12 Seahawks Lane,
4c. City, State, Zip
Renton, WA 98056
. Phone (1)
4e. Phone (2)
4f. Fax
A E-mail
{ 425 ) 203-8000
{ )
{ )
24N
Part 5—Project Location(s)
Identifying information about the property or properties where the project will occur. hgjpj
❑ There are multiple properties or project locations (e.g., linear projects). Complete the section below and use
DARPA Attachment B for each additional property.
5a. Street Address (Cannot be a PO Bax. if there is no address, provide other location information in ;5n)hjh l ]
12 Seahawks Lane, (Formerly 5015 Ripley Lane)
5b. City, State, Zip (If the project is not in a city or town, provide the name of the nearest city or town.) , hLelpj
Renton, WA 98056
5c. County he(�l
King
5d. Provide the section, township, and -range for the project location. hel
'A Section
Sections.
Township
=, Ran ge
SW
29
24N
05E
5e. Provide the latitude and longitude of the project location. hel
• Example: 47.03922 N [at, l -122.89.142 :W long
47* 32' 14" LAT, 122* 11' 53" LON
5f. List the tax parcel number(s) for the, project location.[hel
• The local county assessor's office can, provide this information.
292405 9015
5 g•Indicate the type of ownership of the rope y {check all that apply,) [ help]
❑ State awned Aquatic Land ❑ Tribal ® Private
❑ Other publicly owned (federal, state, county, city, special districts like schools, ports, etc.)
DARPA 2009 Page 2 of 11
C�
C�
5h. Contact information for all adjoining property owners, lessees, etc. (If you need more space, use JARPA
Attachment C.)h[ eJ
Name
Mailing Address
Tax Parcel # (if known)
Misty Cove Condominiums
Football NW LLC
5021 Ripley Lane, Renton, WA 98056
Lake Washington Blvd,, Renton, WA 98056
292405 9001
5i. Is any part of the project area within a 1 00 -year flood plain'?. lhelAi
❑ Yes ❑ No ® Don't !snow
5j. Briefly describe the Vegetation and, habitat condition's on the property. h
Planting Plan recently applied ( See Corps NWS2007-1899}
5k. Describe hove the property is currently used.hf elal.
Private Football NW LLC Pier situated at FNW LLC Facilities.
51. Describe how the adjacent properties are currently .used i
Condominiums to the North. Open lot to the south.
JARPA 2009 Page 3 of 11
s
•
6m. Describe the structures (above and below ground) on the property, including their purpose(s). jhgid
Virginia Mason Athletic Center, containing FNW LLC facilities. Open football geld. Closed field within
Center.
5n. Provide driving directions from the closest highi►vay to1he project location, and attach -a reap.
1. b. Take ramp right for SR -520 East 5.9 mi
2.07. Take ramp right for I-405 South toward Renton 7.4 mi
3. 8. At exit 7, take ramp right toward NE 44th St 0.2 mi
4. 9. Turn right onto N 44th St, and then immediately turn right onto Lake Washington Blvd N 0.4 mi
5. EPB 10. Arrive at Ripley Ln N
Part 6—Project Description
6a. Summarize;;the overall project. You can provide more.detail in 6d. fteio
Install pre fabricated boatlift with fully grated platform top.
6b. Indicate the project category. (Check au #hat apply } hoc,
❑ Commercial ❑ Residential ❑ Institutional ❑ Transportation
® Recreational
❑ Maintenance ❑ Environmental Enhancement
66. Indicate the major elements of your project. ' (Check all th,% a ft!a gj
❑ Aquaculture
❑ Culvert
❑ Float
❑ Road
❑ Bank Stabilization
❑ Dam 1 Weir
❑ Geotechnical Survey
❑ Scientific Measurement
❑ Boat House
❑ Dike / Levee / Jetty
❑ Land Clearing
Device
❑ Boat Launch
❑ Ditch
❑ Marina / Moorage
❑ Stairs
® Boat Lift
❑ Dock ! Pier
❑ Mining
❑ Stormwater facility
❑ Bridge
❑ Dredging
❑ Outfall Structure
❑ Swimming Pool
❑ Bulkhead
❑ Fence
❑ Piling
❑ Utility Line
❑ Buoy
❑ Ferry Terminal
❑ Retaining Wall (upland)
❑ Channel Modification
❑ Fishway
❑ Other:
JARPA 2009 Page 4 of 11
0 0
6d. Describe how you plan to construct each project element checked in 6c. Include specific construction
methods and equipment to be used. [helpl
• Identify where each element will occur in relation to the nearest waterbody.
Indicate which activities are within the goo -year flood plain.
Pre assembled boatlift with 10' x 20' fully grated platform deck to be transported by barge to site, and lowered
alongside the existing pier in water depth of 10'-1 V. Delivery and all work performed from barge. Barge shall not
ground out at any time.
; 6e. ,What are'the start and end dates for project construction? (monthtyear), lel ..a
If. the project will be constructed in phases or stages, use JARPA Attachment D to list the''start and end 'dates of -each phase or
stage. .
Start date: Est. as 12-26-09 to 12-31-09 ❑ See JARPA Attachment D
E Describe the purpose of the work.and why you want or need to perform it. hf�]
The lift will allow an intermediate level for safe boarding of smaller vessels when the lake is at low water
levels. The pier structure, with deck level at 2'-6" above OHW by regulatory requirement, is up to 4'-6"
above lake level during approximately eight months of the year when the lake level is lowered by the
Corps of Engineers. See Permit Drawings.
.69. Fair market value of the project, including materials, labor, machine rentals, etc. `el
$20,000.00
Bh. Will,any poriron df the project receive federal funding? fteA
• Ifyesagency lisfeach a g'nc
y . y providing funds.
❑ Yes ® No ❑ Don't know
Part 7—Wetlands: Impacts and Mitigation
❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.)
Ta Descnbe 1,aw the project.has. been designed to avoid and minimize adverse impacts to wetlands. heAt
® Not applicable
JARPA 2009 Page 5 of 11
9
7b. Will the project impact wetlands?he( el
❑ Yes ® No ❑ Don't know
7c. Will the project impact wetland buffers?h[ e�
❑ Yes ® No ❑ Don't know
7d. Has a wetland delineation report been prepared?heel ]
• If yes, submit the report, including data sheets, with the JARPA package.
El Yes ®No
7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating.
System?hl_e1P]
If yes, submit the wetland rating forms and figures with the JARPA package.
❑ Yes ® No ❑ Don't know
7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? JPAI
• If yes, submit the plan with the JARPA package.
❑ Yes ❑ No ® Not applicable See RGP1
7g. Use the table below to list the type and rating of each wetland that will be impacted; the extent and duration
of the impact; and the type and amount of compensatory mitigation proposed. If you are submitting a
compensatory mitigation plan with a similar table, you may simply state (below) where we can find this
information in the mitigation plan. hel
Activity causing
Wetland type
Impact area Duration
Proposed
Wetland
impact (fill,
and ratin.V
(sq, tL or acres) of imp3ct2
mitigation
mitigation area
drain, excavate,
category
type,
(sq. ft or acres)
flood, etc.
NA
NA
NA NA
NA
NA
' Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System. Provide the wetland
rating forms with the JARPA package.
2 Indicate the time (in months or years, as appropriate) the wetland will be measurably impacted by the activity. Enter "permanent" if
applicable.
3 Creation (C), Re-establishment/Rehabilitation (R), Enhancement (E), Preservation (P), Mitigation Bank/ln-lieu fee (B)
Page number(s) for similar information in the mitigation plan, if available:
7h:; For all filling activities identified in 7g., describe the source and nature of the fill material;the amount in
cubic yards that will be used, and how and,itUhere it will be placed into the wetland.ht go
NA
71. For all excavating activities identified in 7g., describe the excavation method, type and airpunt of material in
cubic yards you will remove, and where the material will be disposed. rheipi
NA
JARPA 2009 Page 6 of 11
7j. Summarize what the comperMory mitigation plan is meant to accomTish, and describe how a watershed
approach was used to design the plan.h[�I
Mitigation not required. First and only lift at site_
Part 8—Waterbodies (other than wetlands): Impacts and Mitigation
In Part 8, "waterbodies" refers to non -wetland waterbodies. (See Part 7 for information related to wetlands.) MIP]
❑ Check here if there are waterbodies on or adjacent to the project area_ (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
I
® Not applicable
8b. Will your project impact a waterbody or the area around a waterbody? "ei
® Yes ❑ No
w.
8c. Summarize impact(s) to each waterbody in the table below. Del
Activity causing
impact (clear,
dredge, fill, pile
drive, etc.)
Waterbody
name
Impact
location'
Duration
of impact
Amount of material
to be placed in or
removed from
waterbody
Area (sq. ft. or
linear fL) of
waterbody
directly affected
Lift sits on lake
bottom
Lake
Washington
End of
Pier
Minimal
Boatlift mechanism
on 4 -pad feet
Less than 9 sq.ft.
total
Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent, provide the distance between the impact and the
waterbody and indicate whether the impact will occur within the 100 -year flood plain.
Indicate the time (in months or years, as appropriate) the waterbody will be measurably impacted by the work. Enter permanent" if
applicable.
'$d,' Have you prepared a mitigation plan•to compensate for the project's adverse impacts to nol) Otland
waterbodies? heI
* ` if yes, submit the plan with the DARPA package.
❑ Yes ❑ No ® Not applicable
8e."Summarize what the compensatory mitigation planismeant to accomplish. Describe how .a watershed
approach was used to design the plan.
• .If you already completed 7j.; you do not need to restate your answer here,hf elpl
NA
JARPA 2009 Page 7 of 11
$f.
For all activities identified in., describe the source and nature of th . I material, amount (in cubic yards)
you will use, and Crow and where it will be placed into the waterbody.h[ M
NA
Phone
-8g.
For all excavating or dredging activities identified in 8c., describe the method for excavating or dredging,
type and amount of material you will remove, ;and where the material will be disposed. h( elp]
NA
( 428-430-7382 )
Part 9—Additional Information
Any additional information you can provide helps the reviewer(s) understand your project.
9a..: If you have already worked with any government agencies on this project, 'list them>below: fFi21p1
Agency Name
Contact Name.
Phone
Most Recent
Date of Contact
City of Renton
Gerry Wasser
( 428-430-7382 )
Oct. 7 & 8, 2009
9b. Are any of the wetlands orwaterbodies identified.in Part 7; or Part 8 on the Washington department of
Ecology's 303(d) List?
• If yes, list the parameter(s), below.
• if you don't know, use Washington Department of Ecology's Wafer Quality Assessment tools at: -
http://%vww.ecy.wa.gov/programstwq/303d/.
❑ Yes ® No
-91C..What U.S. Geological Survey. Hydrological Unit Code (NUG) is the project in?hf eM
• Go.to http:llcfoub epa:_gov/surfhocateCndex.cfm to help identify the HUC.
17110012
9d. What Water Resource inventory Area Number (WRIA #) is the project in? h[. elp
+ Go to hftp:/AvwW.ecy.wa.gov/servj*oe§/Ais/mapstwriatwria-htm to find the WRIA #.
JARPA 2009 Page 8 of 11
9e. Will the in-water construction work comply with the State of Washington water quality standards for
turbidity?ht eM
• Go to http:/hvww.ecv.wa.gov/programslwg/swgs/criteria.html for the standards.
® Yes ❑ No ❑ Not applicable
9f If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline.
environment designation? [!IeI
• If you don't know, contact the local planning department.
• For more information, go to: http://www.egy.n _govlprograms/sea/sma/laws rules/173-261211 designations.html.
❑ Rural ® Urban ❑ Natural ❑ Aquatic ❑ Conservancy ❑ Other
9g. What is the Washington Department of Natural Resources Water Type? hi elP
• Go to htt ://www.dnr_wa. ov/BusinessPermits[ o ies/ForestPracticesA lications/Pa es watertyping.aspx for the Forest
Practices Water Typing System.
❑S ®F ❑Np ❑Ns
9h. Will this project be designed to meet the Washington Department.of Ecology's most current stormwater
manual?hf ell
• If no, provide the name of the manual your project is designed to meet_
® Yes ❑ No
Name of manual:
91. If you know what the property was used for in the past, describe below. Whelp]
Unknown
9j. Has a cultural resource (archaeological) survey been performed on the project area? aelp�
+ If yes, attach it to your JARPA .package.
❑ Yes ® No
9k Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project
area or might be affected by the proposed work. heI
NA
91. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. heI
None Known
JARPA 2009 Page 9 of 11
Part 10-Identify the Peros You Are Applying For
Use the resources and checklist below to identify the permits you are applying for.
+ Online Project Questionnaire at http://apps.ecy.wa_.qov/opas/.
• Governor's Office of Regulatory Assistance at (804) 917-0043 or helps—ora.wa.gov.
10a. Compliance with the State Environmental Policy Act (SEPA), (Check all that apply.) ftAl
• For more information about SEPA, go to www.ecy.wa.gov/programs/sea/seoate-review.htmi.
❑ A copy of the SEPA determination or letter of exemption is included with this application.
® A SEPA determination is pending with City of Renton (lead agency). The expected decision date is
❑ I am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 10b.)
• Submit the Fish Habitat Enhancement Project form with this application. The form can be found at
hftp://www.epermitting-we.gov/Portals/ Jar aResourceCenterlima es/defaultlfishenhancement.doc
❑ This project: is exempt (choose type of exemption below).
❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt?
❑ Other:
❑ SEPA is pre-empted by federal law. bel
I Ob. Indicate the permits you0r6 applying for. (check all that apply,) tlel .
LOCAL GOVERNMENT
Local Government Shoreline permits:
® Substantial Development ❑ Conditional Use ❑ Variance
❑ Shoreline Exemption Type (explain):
Other citylcounty permits:
❑ Floodplain Development Permit ❑ Critical Areas Ordinance City of Renton
STA O RNMENT
Washington Department of Fish and Wildlife: NA l WAC 220-110-224
❑ Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption
Washington Department of Ecology:
❑ Section 401 Water Quality Certification
Washington Department of Natural Resources:
❑ Aquatic Resources Use Authorization
FEDERAL. GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404 (discharges into waters of the U.S.) ® Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects)
JARPA 2009 Rage 10 of 11
Part I1 -Authorizing Si^ures fs
Signatures required before submitting the JARPA package-
Ila.
ackage_
I la. Applicant Signature (required) LheM
certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work
only after I have received all necessary permits.
1 hereby authi t e agent named in Part 3 of this application to act on my behalf in matters related to this
application.' (initial)
By initialing here, i statet t have the authority to grant access to the property. I also give my consent to the
permitting agencies enter ,.,h operty where the project is located to inspect the project site or any work
related to project. (initial)
October 8. 2009
licant Date
71 b. Authorized Agent Signaturehf eM
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work
only after all necessary permits have been issued.
October 8, 2009
Authorized Agent Date
IIc. Property Owner Signature (if not applicant) tei
consent to the permitting agencies entering the property where the project is located to inspect the project site
or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the
landowner.
.9
Property Owner Date
18 U.S.0 §1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies, conceals, or covers up by any trick, scheme, or device a material fact or makes any false, fictitious, or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false, fictitious, or fraudulent statement or
entry, shall be fined not more than $10,000 or imprisoned not more than 5 years or both.
If you require this document in another format, contact The Governor's Office of Regulatory Assistance (ORA)_ People with hearing loss
can call 711 for Washington Relay Service_ People with a speech disability can call (877) 833-6341.
ORA publication number: ENV -019-09
DARPA 2009 Page 11 of 11
CENWS-0D-RG-RGP-1 0 9 face ] of
City Of
APPENDIX A
Application Form 41:
For RGP 1, Watercraft Lifts
Version: January 29, 2007;
Please fully complete this form and attach vicinity, plan and elevation drawings and any other relevant
information. Submit the information to: U.S. Army Corps of Engineers, Regulatory Branch,
P.O. Box 3755, Seattle, Washington 98124-3755.
This application is for watercraft lifts and canopies in certain fresh and marine/estuarine waters within
the State of Washington for the purpose of safe watercraft moorage. You may use this application
whether or not your project meets all requirements of Regional General Permit I (RGP 1). However,
projects not meeting all requirements or for_Category B and E in the Lake Washington and Sammamish
system, must undergo Section 7 Endangered Species Act (ESA) consultation with the National Marine
Fisheries Service (NMFS) and U.S. Fish and Wildlife Service (USFWS)_ Section 7 ESA consultation
may involve a more conservative design or additional mitigation. Therefore, projects not meeting all
requirements should provide a greater amount of mitigation than is required by RGP 1 in order to offset
impacts to the aquatic environment.
Eligibility for RGP
a. Corps reference number: f To be completed by the Corps]
b_ This application:
❑ Meets all of the requirements of RGP 1.
❑ Does not meet all of the requirements of RGP 1. This form constitutes an application for an
individual permit and a reference biological evaluation in association with
NMFS reference: 2403/01572
USFWS reference: I -3 -05 -PI -0432
1. Permittee name, address, and telephone number:
Football Northwest LLC, Attn: Lance Lopes
12 Seahawks Lane
Renton, WA 98056
Single or Joint Use (adjacent waterfront structure): Single If joint use, you must list the other waterfront
property owners: name, address, and telephone number, as co -applicants.
Authorized agent's name, address, and telephone number:
Alan Foltz, Waterfront Construction, Inc.
205 NE Northlake Way, Suite 234
Seattle, WA 98105
3. Contractor name, address, telephone number, and point of contact:
Waterfront Constrwon, Inc.
205 NE Northlake Way, Suite 230
Seattle, WA 98105
206-548-9800
4_ Specific location of project area:
Name of Waterway Lake Washington
Street Address 12 Seahawks Lane
Section 29 Township 24N Range 05E
Latitude 47* 32' 14" Longitude -122* 11'53"
City/County Renton, King County, Washington State
Adjacent Property Owners (names and addresses)
Misty Cove Condominiums, 5021 Ripley Lane, Renton, WA 98056
Football NW LLC, Lake Washington Blvd., Renton, WA 98056
5. Description of the proposed work and drawings (attach drawings on 8'/2- by 11 -inch sheets, including a
vicinity map, a plan view, and an elevation view; the drawings must include information as detailed on
Appendix E -- Drawing Checklist). The drawings must clearly show the factors detailed in the project
description section of this RGP. The work is proposed under Category A of RGP 1.
Install pre fabricated boatlift with fully grated platform top. First and only lift at site_
6. Description of the Single or Joint Use Overwater Structure adjacent to proposed activity:
Condominium piers to the north.
To the south, no structures on adjacent property. See permit drawings.
7. Number of exist in watercraft lifts and/or canopy(ies) at the existing overwater structure.-
ground-based
tructure:ground-based lifts 0 floating lifts 0 suspended lifts 0 canopies 0
8. Number of the previously identified (item 8) existing lifts to be replaced, maintained, or repaired: ground-
based lifts 0 floating lifts 0 suspended lifts 0 canopies 0
9_ Number of brand new: ground-based lifts 1 floating lifts 0 suspended lifts 0 canopies 0
10. Depth of landward most end of proposed watercraft lift(s) and/or canopy(ies) 10'-11 " feet
H. Pile driving. YIN N_ ; If yes, number of. wood piling steel piling; If using an impact hammer
for steel piling, list sound attenuation device(s):
12_ In marine waters: Eelgrass survey performed: preliminary NIA intermediate ; attach findings
13. In marine waters: Forage fish habitat? YM N; attach documentation
14. Required Mitigation Points (MP): None- Category A, First Lift (show calculations); location of mitigation
site onsite/offsite N/A; Mitigation Measure Option(s) # 0; Description of proposed mitigation activity:
15. Work Window.
Work will be performed in the dry: ❑ Yes ® No
Work will contact substrate: ® Yes ❑ No
Distance to bald eagle nest: 1 Mi.+
Types) of equipmeAlized for watercraft installation: Bare inountrane
Date Work Completed: (if application is submitted after completion of work)
Endangered Species Act (ESWOrmation: Special Project Information 9
In order to meet all ESA requirements for authorization under this Regional General Permit (RGP), all applicable
Requirements summarized below must be implemented. Check each item that you agree to implement. Check each
item "not applicable" if they do not apply to your project. For example, if your project is in freshwater, check "not
applicable" next to the Requirement 5 regarding eelgrass and macroalgae beds.
Will
Will Not Not
Requirements
Implement
Implement Applicable
® ❑ ❑
1. The proposed work is within the limitations of Category A — F types
of work authorized by RGP 1.
❑ ❑ ®
2. Pile Driving Requirements: if a drop hammer pile driver for steel
piling is utilized, a sound attenuation device or system must be
implemented during pile driving. The diameter of any steel piling
cannot exceed 12 inches.
® ❑ ❑
3. The required fish work window will be met.
® ❑ ❑
4. The required bald eagle work window will be met.
® ❑ ❑
S. The appropriate amount of project impact reduction and mitigation
measures will be implemented.
❑ ❑ ®
6. Mitigation must be completed within one year of permit issuance_ A
report on mitigation completion, including as -built drawings, must
be submitted to the Corps 12 months from the date the Corps issues
an RGP to the permittee.
❑ ❑ ®
7. For projects with mitigation, a copy of this permit, permit drawings,
mitigation planting plan (if applicable), and final authorization letter
shall be recorded with the Registrar of Deeds, within 60 days after
final Corps authorization, to ensure that subsequent property owners
are aware of the installation, use, and mitigation requirements.
Proof of this must be provided to the Corps within 65 days after the
date of the Corps' RGP verification letter to the permittee (General
Condition 26).
❑ ❑ ®
8. Mitigation planting monitoring reports will be due annually, no later
than November 30 of each monitoring year, for 5 years from when
Corps accepts the as -built drawings.
® ❑ ❑
9. The permittee must put the Department of the Army (DA) permit
reference name and number on the authorized watercraft lifts. The
name and number must be written such that the marking is
permanent, is located above the water surface, and can be clearly
seen. The Corps will provide the DA reference name and number to
the permittee (Special Condition 1).
❑ ❑ ®
10. No work may be performed over or within 50 feet of ec[grass and
macroal ae beds (Special Condition 2).
® ❑ ❑
11. No work may be performed in or within 50 feet of Washington State
documented spawning habitat for listed or proposed forage fish
species (Special Condition 3).
® ❑ ❑
12. During the installation and utilization of the watercraft lift(s) no
large woody debris is removed (Special Condition 4).
® ❑ ❑
9. All structural steel members are pre -painted and dried prior to
installation (Special Condition 5).
4
Will
Will Not
t Requirements
Implement
Implement
Applicable
® ❑
❑ 10. If watercraft lifts include wood, only non -treated wood shall be used
in fresh waters. In tidal waters, no creosote, pentachlorophenol,
CCA, or comparably toxic compounds not approved for marine use,
shall be used for any portion of the overwater structure. For any
ACLA treated wood, the wood must be treated by the manufacturer
per the Post Treatment Procedures outlined in "BMP Amendment
#I - Amendment to the Best Management Practices (BMPs) for the
Use of Treated Wood in Aquatic Environments; USA Version -
Revised July 1446", by the Western Wood Preservers Institute, as
amended April 17, 2002 or the most current BMPs. This
information is available on the intemet at www.WVvrP]nstitute.org.
Third party certification that the material was produced according to
these BMPs must be provided to the Corps before authorized work
can commence (Special Condition 6).
❑ ❑
® IL Only two (2) new piles may be driven and only if necessary for
watercraft lift installation (Special Condition 7).
® ❑
❑ 12. If a barge is used, the barge does not ground out and the barge is not
over or adjacent to vegetated shallows (except where such
vegetation is limited to Washington State designated noxious weeds)
(Special Condition 8).
❑ ❑
® 13. Existing watercraft lifts to be removed are removed in their entirety
(Special Condition 9).
❑
® 14. If a floating watercraft lift is installed, it must not rest on the
substrate at any time (Special Condition 10).
® ❑
❑ 15. Work that disturbs the substrate, bank, or shore of a water of the
United State shall occur in the dry whenever practicable (Special
Condition 11).
® ❑
❑ 16. Equipment shall be operated from an out -of --water location
whenever possible. Equipment shall be operated in a manner that
minimizes the suspension of particulates. All equipment used in or
around waters shall be clean and inspected daily prior to use to
ensure that the equipment has no fluid leaks. Should a leak develop
during use, the leaking equipment shall be removed from the site
immediately and not used again until it has been adequately
repaired. No equipment may be stored or fueled so close to a
surface water that the activity could adversely affect the waterbody
(Special Condition 12).
® ❑
❑ 17. All applicable General Conditions will be met.
I CERTIFY THAT l AM FAIAR WITH THE INFORMATION CONTA IN THIS APPLICATION, AND
THAT TO TI IE BEST OF MY KNOWLEDGE AND BELIEF, SUCH INFORMATION IS TRUE, COMPLETE,
AND ACCURATE. I FURTHER CERTIFY THAT I POSSESS THE AUTHORITYTO UNDERTAKE TIME
PROPOSED ACTIVITIES. I HEREBY GRANT TO THE AGENCIES TO WHICH THIS APPLICATION IS
MADE, THE RIGHT TO ENTER THE ABOVE-DESCRIBED LOCATION TO INSPECT THE PROPOSED, IN -
PROGRESS, OR COMPLETED WORK. I AGREE TO START WORK ONLY AFTER ALL NECESSARY
PERMITS HAVE BEEN RECEIVED.
If the applicant has checked "Will Not Implement" for any of the above items, then the
following items must be completed by the applicant:
❑ You must attach a completed Coastal Zone Management form.
Note: This form can be found on the Corps' website: www.nws.usace.aM.mil/reg click on Regulatory -
Regulatory/Permits — Forms.
❑ Based on the existing environmental conditions and the proposed work, the applicant is proposing additional
mitigation (beyond the requirements of Table 1) as described below:
of
Signature of Auorized Agent �P
Signature of Contractor `
0
,.
Date
Date
Date
DEVELOPMENT SERVICES DIVISION y
pra9 I',
ENVIRONMENTAL CHECKLIST-"
City of Renton Development Services DivisionG(Ir
1055 South Grady Way, Renton, WA 98055
Phone: 425-430-7200 Fax: 425-430-7231 f
PURPOSE OF CHECKLIST:'`'
The State Environmental Policy Act (SEPA), Chapter 43.21 C RCW, requires all governmental agencies to
consider the environmental impacts of a proposal before making decisions. An Environmental Impact
Statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the
quality of the environment. The purpose of this checklist is to provide information to help you and the
agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be
done) and to help the agency decide whether an EIS is required.
INSTRUCTIONS FOR APPLICANTS:
This environmental checklist asks you to describe some basic information about your proposal.
Governmental agencies use this checklist to determine whether the environmental impacts of your
proposal are significant, requiring preparation of an EIS_ Answer the questions briefly, with the most
precise information known, or give the best description you can.
You must answer each question accurately and carefully, to the best of your knowledge. In most cases,
you should be able to answer the questions from your own observations or project plans without the need
to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write
"do not know" or "does not apply". Complete answers to the questions now may avoid unnecessary
delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark
designations. Answer these questions if you can. If you have problems, the governmental agencies can
assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your proposal
or its environmental effects. The agency to which you submit this checklist may ask you to explain your
answers or provide additional information reasonably related to determining if there may be significant
adverse impact.
USE OF CHECKLIST FOR NONPROJECT PROPOSALS:
Complete this checklist for nonproject proposals, even though questions may be answered "does not
apply." IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D).
For nonproject actions (actions involving decisions on policies, plans and programs), the references in the
checklist to the words "project," "applicant," and "property or site" should be read as "proposal,"
"proposer," and "affected geographic area," respectively.
CADocuments and Setting Malan\Desktop\My LetterslFNW Platform Liftlenvchlst.doc10107109
E
A. BACKGROUND
1. Name of proposed project, if applicable:
Football Northwest Platform Lift
2. Name of applicant:
Lance Lopes, Football NW; Alan Foltz, Agent
3. Address and phone number of applicant and contact person:
Alan Foltz,Waterfront Construction, In c.,205 NE Northlake Way,Suite 230, Seattle, WA 98105
Alan Foltz: 206-548-9800 (Contact) . Lance Lopes: 425-203-8000 (Applicant)
4. Date checklist prepared:
October 7, 2009
5. Agency requesting checklist:
City of Renton, WA
6. Proposed timing or schedule (including phasing, if applicable):
As permits allow. No phasing. 1 Day
7. Do you have any plans for future additions, expansion, or further activity related to or connected
with this proposal? If yes, explain.
No. None known.
8. List any environmental information you know about that has been prepared, or will be prepared,
directly related to this proposal.
None known.
9. Do you know whether applications are pending for governmental approvals of other proposals
directly affecting the property covered by your proposal? If yes, explain.
None known.
10. List any governmental approvals or permits that will be needed for your proposal, if known.
Renton SDP, SEPA, BP; Corps RGP1
11. Give brief, complete description of your proposal, including the proposed uses and the size of the
project and site.
The addition / placement of one 10' wide by 20' long free standing, fully grated platform lift at the
northwest end of the existing pier structure.
CADocuments and SetGngslalan\Desktop%My Letters%FNW Plafform Ld*nvchlst.doc 2
12. Location of the proposal. Give sufficient information for a person to understand the precise
location of your proposed project, including a street address, if any, and section, township, and
range if known. If a proposal would occur over a range of area, provide the range or boundaries
of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if
reasonably available. While you should submit any plans required by the agency, you are not
required to duplicate maps or detailed plans submitted with any permit applications related to this
checklist.
1A Sec: SW 29 24N 05E; Parcels 292485 9015 & 292405- 9001; LAT 47*32'14", LON 122*11153"
12 Seahawks Lane, Renton 98056
B. ENVIRONMENTAL ELEMENTS
1. EARTH
a. General description of the site (circle one); flat• rolling, hilly, steep slopes, mountainous,
other
b. What is the steepest slope on the site (approximate percent slope?)
NIA
C. What general types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them and note any
prime farmland.
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe.
None Known
e. Describe the purpose, type, and approximate quantities of any filling or grading proposed.
Indicate source of fill.
IMI
f, Could erosion occur as a result of clearing, construction, or use? If so, generally
describe.
NIA
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)?
N/A
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
None Proposed
C:Oocuments and Settingslalan\Desktop\My Letters\FNW Platform Liftlenvchlst.doc 3
2. AIR
a. What types of emissions to the air would result from the proposal (i.e., dust, automobile,
odors, industrial wood smoke) during construction and when the project is completed? If
any, generally describe and give approximate quantities if known.
Muffled diesel exhaust from construction crane and tug during 1 to 2 hour
placement.
b. Are there any off-site sources of emission or odor that may affect your proposal? If so,
generally describe_
None known.
C. Proposed measures to reduce or control emissions or other impacts to air, if any:
Use of equipment only as needed.
3. WATER
a. Surface Water:
1) Is there any surface water body on or in the immediate vicinity of the site (including year-
round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type
and provide names. If appropriate, state what stream or river it flows into.
Lake Washington
2) Will the project require any work over, in, or adjacent to (within 200 feet) the described
waters? If yes, please describe and attach available plans.
Yes, placement of one free standing platform lift.
3) Estimate the amount of fill and dredge material that would be placed in or removed from
surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material.
NIA
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known.
No. NIA
5) Does the proposal lie within a 100 -year flood plain? If so, note location on the site plan.
Not known
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge.
No. NIA
CADocuments and 5ettingsWan0esktoplMy LettersTNW Platform Liftlenvchlst.doc 4
b. Ground Water:
1) Will ground water be withdrawn, or will water be discharged to ground water? Give
general description, purpose, and approximate quantities if known.
No. N/A
2) Describe waste material that will be discharged into the ground from septic tanks or other
sources, if any (for example: Domestic sewage; industrial, containing the following
chemicals...; agricultural; etc.). Describe the general size of the system, the number of
such systems, the number of houses to be served (if applicable), or the number of
animals or humans the system(s) are expected to serve.
N/A
C. Water Runoff (including storm water):
1 } Describe the source of runoff (including storm water) and method of collection and
disposal, if any (include quantities, if known). Where will this water flow? Will this water
flow into other waters, If so, describe.
NIA
2) Could waste material enter ground or surface waters? If so, generally describe.
No. NIA
d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if
any:
None proposed
4. PLANTS
a. Check or circle types of vegetation found on the site:
x deciduous tree: alder, maple, aspen, other
evergreen tree: fir, cedar, pine, other
x shrubs
x grass
pasture
crop or grain
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eel grass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
None
C. List threatened or endangered species known to be on or near the site_
None known
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any: None. Corps RGP1 does not require mitigation of any
sort for the first installed lift.
CADocuments and settingslalan\Desktop\My Letters\FNW Platform Liftlenvchlst.doc 5
0
a. ANIMALS
a. Circle any birds and animals which have been observed on or near the site or are known
to be on or near the site:
Birds: hawk, heron, eagle, songbirds, other
Mammals: deer, bear, elk, beaver, other
Fish: bass, salmon, trout, herring, shellfish, other
b. List any threatened or endangered species known to be on or near the site.
Salmon
C. Is the site part of a migration route? If so, explain
Adult fish migrate through the area early January and early May. No spawning
occurs in the project area.
d. Proposed measures to preserve or enhance wildlife, if any:
None proposed
&. ENERGY AND NATURAL RESOURCES
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the
completed project's energy needs? Describe whether it will be used for heating,
manufacturing, etc.
Lift is solar battery powered
b. Would your project affect the potential use of solar energy by adjacent properties? If so,
generally describe.
NIA
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any:
NIA None
7. ENVIRONMENTAL HEALTH
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous waste, that could occur as a result of this
proposal? If so, describe.
No
1) Describe special emergency services that might be required.
Emergency spill contacts posted with permits
2) Proposed measures to reduce or control environmental health hazards, if any:
None proposed
Caaocuments and Setting slalan0esktoplMl y LettersTNW Platform Liftlenvchlst.doc 6
b. Noise
1) What types of noise exist in the area which may affect your project (for example: traffic,
equipment, operation, other)?
NIA
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)?
Indicate what hours noise would come from the site.
Short term muffled exhaust of diesel crane operation
3) Proposed measures to reduce or control noise impacts, if any:
None proposed
8. LAND AND SHORELINE USE
a_ What is the current use of the site and adjacent properties?
Football NW facilities and sports playing field
b_ Has the site been used for agriculture? If so, describe.
No NIA
c. Describe any structures on the site.
Existing pier and boathouse (to the north)
d_ Will any structures be demolished? If so, what?
No New pier under B070755.
e. What is the current zoning classification of the site?
COR
f. What is the current comprehensive plan designation of the site?
Not known
g. If applicable, what is the current shoreline master program designation of the site?
Not known if, as applicable
h. Has any part of the site been classified as an "environmentally sensitive" area? If so,
specify.
Shoreline area
i. Approximately how many people would reside or work in the completed project?
NIA
CADocuments and SetUngslalan\Desktop%My LettersTM Platform Liftlenvchlst.doc 7
j. Approximately how many people would the completed project displace?
NIA
k. Proposed measures to avoid or reduce displacement impacts, if any:
None proposed
I. Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any:
None proposed
9. HOUSING
a. Approximately how many units would be provided, if any? Indicate whether high, middle,
or low-income housing.
NIA
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing.
NIA
C. Proposed measures to reduce or control housing impacts, if any:
NIA
10. AESTHETICS
a. What is the tallest height of any proposed structure(s), not including antennas; what is the
principal exterior building materials) proposed.
NIA Proposed boom is approx. 8" above waterline
b. What views in the immediate vicinity would be altered or obstructed?
None
C. Proposed measures to reduce or control aesthetic impacts, if any:
Mitigation for the facilities results in shoreline restoration, including clean-up of
contaminated material, removal of creosote timber and concrete, and man made
flotsam.
11. LIGHT AND GLARE
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur?
None
b. Could light or glare from the finished project be a safety hazard or interfere with views?
NIA No
CADocuments and Settingslalan\Desktop\My LettersTNW Platform Liftlenvchlst,doc 8
0 0
c. What existing off-site sources of light or glare may affect your proposal?
NIA
d. Proposed measures to reduce or control light and glare impacts, if any:
None proposed
12. RECREATION
a. What designated and informal recreational opportunities are in the immediate vicinity?
Lakeside boating, water sports
b_ Would the proposed project displace any existing recreational uses? If so, describe.
M.
C. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any:
Safety Enhancement.
The lift will allow an intermediate level for safe boarding of smaller vessels when the lake is
at low water levels. The pier structure, with deck level at 2'-6" above OHW by
regulatory requirement, is up to 4'-6" above lake level during approximately eight months of
the year when the lake level is lowered by the Corps of Engineers.
13. HISTORIC AND CULTURAL PRESERVATION
a. Are there any places or objects listed on, or proposed for, national state, or local
preservation registers known to be on or next to the site? If so, generally describe.
No
b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or
cultural importance known to be on or next to the site.
C. Proposed measures to reduce or control impacts, if any:
None proposed
14. TRANSPORTATION
a. Identify public streets and highways serving the site, and describe proposed access to the
existing street system. Show on site plans, if any.
Seahawks Way, formerly Ripley Lane
b. Is site currently served by public transit? If not, what is the approximate distance to the
nearest transit stop?
Not known
c. How many parking spaces would the completed project have? How many would the project
eliminate?
NIA
CADocuments and 5ettingsWanlDesktoplMy LetterslFNW Platform Liftlenvchlst.doc
J
0 0
d. Will the proposal require any new roads or streets, or improvements to existing roads or
streets, not including driveways? If so, generally describe (indicate whether public or
private?
No
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation?
If so, generally describe.
NIA
f. How many vehicular trips per day would be generated by the completed project? If
known, indicate when peak volumes would occur.
NIA
g. Proposed measures to reduce or control transportation impacts, if any:
None proposed
15. PUBLIC SERVICES
a. Would the project result in an increased need for public services (for example: fire
protection, police protection, health care, schools, other)? If so, generally describe.
12
b. Proposed measures to reduce or control direct impacts on public services, if any.
None proposed
16. UTILITIES
a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service,
telephone, sanitary sewer, septic system, other.
None in proposed project area
b. Describe the utilities that are proposed for the project, the utility providing the service, and
the general construction activities on the site or in the immediate vicinity which might be
needed.
None proposed NIA
C. SIGNATURE
I, the undersigned, state that to the best of my knowledge the above information is true and
complete. It is understood that the lead agency may withdraw any declaration of non -significance
that it might issue in reliance upon this checklist should there be any willful misrepresentation or
willful lack of full disclosure on my part.
Proponent:
— --
Name Printed: Alan D. Foltz OV
Date:
CADocuments and Settingslalan\DesktopWy LettersTNW Platform Liftlenvchlst.doc 10
CITY OF RENTON cit
1055 S. Grady Way -� of
Renton, WA 98055fr�; tit�9#�d3
Printed: 10-08-2009
Land Use Actions
RECEIPT LQ
Permit#: LUA09-134
Payment Made: 10/08/2009 03:33 PM Receipt Number: R0904316
Total Payment: 250.00 Payee: SEATTLE SEAHAWKS
Current Payment Made to the Following Items:
Trans Account Code Description Amount
------------------------------------------------------ ----------------
5009 000.345.81.00.0006 Conditional Use Fees 250.00
Payments made for this receipt
Trans Method Description Amount
Payment Check 017971 250.00
Account Balances
Trans
Account Code
Description
Balance Due
------
3021
------------------
303.000.00.345.85
------------------------------
Park Mitigation Fee
---------------
.00
5006
000.345.81.00.0002
Annexation Fees
.00
5007
000.345.81.00.0003
Appeals/Waivers
.00
5006
000.345.81.00.0004
Binding Site/Short Plat
.00
5009
000.345.81.00.0006
Conditional Use Fees
1,750.00
5010
000.345.81.00.0007
Environmental Review
500.00
5011
000.345.81.00.0008
Prelim/Tentative Plat
.00
5012
000.345.81.00.0009
Final Plat
.00
5013
000.345.81.00.0010
PUD
.00
5014
000.345.81.00.0011
Grading & Filling Fees
.00
5015
000.345.81.00.0012
Lot Line Adjustment
.00
5016
000.345.81.00.0013
Mobile Home Parks
.00
5017
000.345.81.00.0014
Rezone
.00
5018
000.345.81.00.0015
Routine Vegetation Mgmt
.00
5019
000.345.81.00.0016
Shoreline Subst Dev
250.00
5020
000.345.81.00.0017
Site Plan Approval
.00
5021
000.345.81.00.0018
Temp Use, Hobbyk, Fence
.00
5022
000.345.81.00.0019
Variance Fees
.00
5024
000.345.81.00.0024
Conditional Approval Fee
.00
5036
000.345.81.00.0005
Comprehensive Plan Amend
.00
5909
000.341.60.00.0024
Booklets/EIS/Copies
.00
5941
000.341.50.00.0000
Maps (Taxable)
.00
5954
650.237.00.00.0000
DO NOT USE - USE 3954
.00
5955
000.05.519.90.42.1
Postage
.00
5998
000.231.70.00.0000
Tax
.00
Remaining Balance Due: $2,500.00
Printed. 10-08-2009
CITY OF RENTON
1055 S. Grady Way
Renton, WA 98055
Land Use Actions
RECEIPT
Permit#: LUA09-134
Payment Made: 10/08/2009 03:35 PM Receipt Number:
Total Payment: 500.00 Payee: SEATTLE SEAHAWKS
Current Payment Made to the Fallowing Items:
Trans Account Code Description Amount
----------------------------------------------------------------------
5009
------- __--___5009 000.345.81.00.0006 Conditional Use Fees 500.00
Payments made for this receipt
Trans Method Description Amount
---------- -------- --------------------------- --------___--__-
Payment Check 017972 500.00
Account Balances
Trans
Account Code
Description
Balance Due
------
3021
------------------
303.000.00.345.85
-------------------------------
Park Mitigation Fee
---------------
.00
5006
000.345.81.00.0002
Annexation Fees
.00
5007
000.345.81.00.0003
Appeals/Waivers
.00
5008
000.345.81.00.0004
Binding Site/Short Plat
-00
5009
000.345.81.00.0006
Conditional Use Fees
1,250.00
5010
000.345.81.00.0007
Environmental Review
500.00
5011
000.345.81.00.0008
Prelim/Tentative Plat
.00
5012
000.345.81.00.0009
Final Plat
.00
5013
000.345.81.00.0010
PUD
.00
5014
000.345.81.00.0011
Grading & Filling Fees
.00
5015
000.345.81.00.0012
Lot Line Adjustment
.00
5016
000.345.81.00.0013
Mobile Home Parks
.00
5017
000.345.81.00.0014
Rezone
-00
5018
000.345.81.00.0015
Routine Vegetation Mgmt
.00
5019
000.345.81.00.0016
Shoreline Subst Dev
250.00
5020
000.345.81.00.0017
Site Plan Approval
.00
5021
000.345.81.00.0018
Temp Use, Hobbyk, Fence
.00
5022
000.345.81.00.0019
Variance Fees
.00
5024
000.345.81.00.0024
Conditional Approval Fee
.00
5036
000.345.81.00.0005
Comprehensive Plan Amend
.00
5909
000.341.60.00.0024
Booklets/EIS/Copies
.00
5941
000.341.50.00.0000
Maps (Taxable)
.00
5954
650.237.00.00.0000
DO NOT USE - USE 3954
.00
5955
000.05.519.90.42.1
Postage
.00
5998
000.231.70.00.0000
Tax
.00
Remaining Balance Due: $2,000.00
R0904317
Printed: 10-08-2009
Payment Made
CITY OF RENTON
1055 S. Grady Way
Renton, WA 98055
Land Use Actions
RECEIPT
Permit#: LUA09-134
10/08/2009 03:36 PM
Total Payment: 2,000.00
Current Payment Made to the Following Items:
Receipt Number:
Payee: SEATTLE SEAHAWKS
Trans
Account Code
Description
Amount
------
5009
------------------
000.345.81.00.0006
------------------------------
Conditional Use Fees
----------------
1,250.00
5010
000.345.81.00.0007
Environmental Review
500.00
5019
000.345.81.00.001.6
Shoreline Subst Dev
250.00
Payments made for this receipt
Trans Method Description Amount
Payment Check 017973 2,000.00
Account Balances
Trans
Account Code
Description
Balance Due
------
3021
------------------
303.000.00.345.85
------------------------------
Park Mitigation Fee
---------------
.00
5006
000.345.81.00.0002
Annexation Fees
.00
5007
000.345.81.00.0003
Appeals/Waivers
.00
5008
000.345.81.00.0004
Binding Site/Short Plat
.00
5009
000.345.81.00.0006
Conditional Use Fees
00
5010
000.345.81.00.0007
Environmental Review
04
5011
000.345.81.00.0008
Prelim/Tentative Plat
.00
5012
000.345.81.00.0009
Final Plat
.00
5013
000.345.81.00.0010
PUD
.00
5014
000.345.81.00.0011
Grading & Filling Fees
.00
5015
000.345.81.00.0012
Lot Line Adjustment
.00
5016
000.345.81.00.0013
Mobile Home Parks
.00
5017
000.345.81.00.0014
Rezone
.00
501.8
000.345.81.00.0015
Routine Vegetation Mgmt
.00
5019
000.345.81.00.0016
Shoreline Subst Dev
.00
5020
000.345.81.00.0017
Site Plan Approval
.00
5021
000.345.81.00.0018
Temp Use, Hobbyk, Fence
.00
5022
000.345.81.00.0019
Variance Fees
.00
5024
000.345.81.00.0024
Conditional Approval Fee
.00
5036
000.345.81.00.0005
Comprehensive Plan Amend
.00
5909
000.341.60.00.0024
Booklets/EIS/Copies
.00
5941
000.341.50.00.0000
Maps (Taxable)
.00
5954
650.237.00.00.0000
DO NOT USE - USE 3954
.00
5955
000.05.519.90.42.1
Postage
00
5998
000.231.70.00.0000
Tax
.00
Remaining Balance Due: $0.00
R0904318
PROJECT DESIGNED BY:
Wat&, rai Con -,"Rion Inc,
THIS nOCUMENT iS PROPRIETARY PROPERLY OF WATERFRONT
CONSTRUCTION INC.. AND IS NOT TO SE USED, IN WHOLE OR IN
PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN
AUTHCRZATION OF WATERFRONT CCNSTRUCTION INC.
LEGAL DESCRIPTION
1/4 SEC: SW 29 -24N -05E
TAXLOT �: 292405 9015
292405 15 "BAXTER PARCEI- NORTH' RENTON
LUA-00-044 LLA RFC NO 20010105900005
WCH 1S POR OF SW 1/,t 29-24-65 LY WLY City
OF E314 RR CO R/W � ��
p1anoing Diui?
LAT: 47' 32' 14"
LONG: —122• 11' 53"
PRUVIDE PLATFORM LIFT
DATUM: C.Q.E. 0.0' EST 1919
ADJACENT OWNERS:
MISTY COVE CONDOMINIUMS
5021 RIPLY LN
RENTON, WA 98056
F00TGALL NW
LAKE WAHINGTON BLVD
RENTON, WA 98056
OCT
8 ��pr
PROJECT NAME:
FOOTBALL NW LLC
REFERENCE f
SITE LOCATION ADDRESS:
12-SFAHAWKS WAY
RENTOR, WA 98t]Ss
2924059015
WG#: 07-32020,A-1,1
LAKE
FOREST
PARK
EXHIBIT 2
KENMORE
JUANITA
KIYRKLAND
r JOB
SITE
RENTON
AREA MAP/Scale: =Smiles
PROPOSED: PROVIDE FREE STANDING FULLY
GRATED PLATFORM LIFT.
IN! LAKE WASH{NGTON
NEAR: RENTON
COUNTY: KING STATE: WASIiINGTQN
APDL BY: FOOTBALL NW LLC
SHEET: I OF: 5 DATE 10 7-09
�T
LLJ
ME,OINA
LtJ
BELLEVUE
r JOB
SITE
RENTON
AREA MAP/Scale: =Smiles
PROPOSED: PROVIDE FREE STANDING FULLY
GRATED PLATFORM LIFT.
IN! LAKE WASH{NGTON
NEAR: RENTON
COUNTY: KING STATE: WASIiINGTQN
APDL BY: FOOTBALL NW LLC
SHEET: I OF: 5 DATE 10 7-09
EXHIBIT 3
ZONING
P/Blyw JTcA --Jcu 9MVIM
OA , 17 T'7AK R tM, W J/Z
9-
CA I
CA
e ton
r fon
r
I y I
COVED
Fenton City blinto
29 T24N R5E W I/Z
.5429
PROJFCT DESIGNED BY: EXHIBIT 4
�fda�erfi�or� � cn5fnac�ir�r� enc,
THIS DOCU04 Nr Is PROPRIETARY PROPERTY OF WATERFRONT
CONSIRUCTION INC., AND IS NOT TO BE USED, IN WHOLE OR IN
PA4T, F7R ANY OFHER PROJECT WITIOUT THE WRITTEN
PROJECT DEtiIi:NFD SY.
Waterfront Con5"ctiori Ir,c,
TI f15 DOCUMENT ti KOPMETARY PROPERLY DF WATERFRONT
OONSTRUC-PON {NC., AND 15 NOT TO BE USED, IN WHOLE OR iN
FART, FOR ANY OTHER PHOJFCT WITHOUT THE WR{ITI.N
AUTHORILATIUN OF WATERFRONT CONMHUCYION INC.
1-- -J
In W
X W
F
W L'1
r
I
(d�
D
u� A
Uf
EXHIBIT 5
O
J
i
U
Fitt'
onO
on
Pea
YROJECI UESIGNFO BY:
Way—rfrACoinhbdion Inc.
THIS DOCUMENT IS PRGPREETARY PROPERTY CE WAIERFRONI
CONSTRUCTION INC., AND IS NOT TO SF USED. IN WHOLE OR IN
PARI. F IR ANY OTHER PROJECT NITIQUT THC WRIT -EN
AUTHORIL4TION OF WATERFRONT CONSTRUCTION INC.
EXHIBIT 6
�J
Q ti
JJ
w
x
Ic]
F
Z
Z3 z
nr
o�j
N
r
7)
M
crI
z
'-
w
U v
m Lo W
J �..
m
O¢ In
O m
O 3
J
v7 iY
p
O
W Vi
U p -2
J
`�
''�
W O
Z
T
o �w
¢ o
a
0o
Z
1�
4
T
Ln
Ln
.
L�
a }off
t
©aw
r
1,11U
��
JI.J
c
a o
Q
�
(7
Tom. -7
a
��
~v
¢U
0Qa
w
x
a
c�
OW
Ofnf
V
d
I
w r x
W
V V)tj
¢
lop
10�
T
n Iwil
o
U
O
_
pCG m �4
4•�
iLd
O
W
!
LJ
Waw
7 -r y
�r�S'loo
o
fr -
C)o zLj
Q ti
JJ
w
� J
— Cfl
0
LJ
m �
C) Q
w
D _ U
CDJo
w
LIJ = o
n` z
Q
D L`
Q ~
EXHIBIT 7
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
ENVIRONMENTAL. (SEPA) DETERMINATION OF NON -SIGNIFICANCE (DNS)
APPLICATION NUMBER: LUA09-134, ECF, SM, SMC
APPLICANT: Football NW LLC - Lance Lopes
PROJECT NAME: Football NW Platform Lift
DESCRIPTION OF PROPOSAL: The applicant has requested an Environmental Determination, approval
of a Shoreline Conditional Use Permit and a Shoreline Substantial Development Permit for the installation of a
pre -manufactured, freestanding platform (boat) lift in association with an existing dock on Lake Washington, a
Shoreline of Statewide Significance. The proposed project is associated with the Seattle Seahawks Headquarters
and Training Facility on a 721,580 square foot lot in the Commercial/Office/Residential (COR) Zone. The
proposed platform lift would be transported to the site by barge and positioned by a barge -mounted crane.
LOCATION OF PROPOSAL: 12 Seahawks Way
LEAD AGENCY: City of Renton
Environmental Review Committee
Department of Community & Economic Development
This Determination of Nan -Significance is issued under WAC 197-11-340. Because other agencies of jurisdiction may be
involved, the lead agency will not act on this proposal for fourteen (14) days.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on November 13, 2009.
Appeals must be filed in writing together with the required fee with: Hearing Examiner, City of Renton, 1055 South
Grady Way, Renton, WA 98057. Appeals to the Examiner are governed by City of Renton Municipal Code Section 4-8-
110.B. Additional information regarding the appeal process may be obtained from the Renton City Clerk's Office, (425)
430-6510.
PUBLICATION DATE:
DATE OF DECISION:
SIGNATURES:
October 30, 2009
October 26, 2009
f le
_b /� �8 -10
Gregg Zimmerm Ad inistrator Date ! I. avid Daniels, Administrator Date
Public Warks De art ' ent Fire & Emergency Services
Terry Hiigashiyama, Administrator Date kPPiih, Adminis rator Date
Community Services Department Department of Community &
Economic Development
EXHIBIT 8
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENTJ ,L. `
PLANNING DIVISION
SHORELINE MANAGEMENT ACT OF 1971
PERMIT FOR SHORELINE MANAGEMENT
EVALUATION FORM & DECISION
DATE OF PERMIT ISSUANCE:
LAND USE ACTION FILE NO.:
DATE RECEIVED
DATE OF PUBLIC NOTICE:
TYPE OF ACTION(S):
LUA09-134, ECF, SM, SMC
October 8, 2009
October 9, 2009
❑ Substantial Development Permit
® Conditional Use Permit
❑ Variance Permit
Pursuant to Chapter 90.58 RCW, staff recommends that the City of Renton grant a Shoreline
Substantial development Permit and a Shoreline Conditional Use Permit. This action is
proposed on the following application:
PROJECT NAME: Football Northwest Platform Lift
PROJECT MANAGER: Gerald Wasser, Associate Planner
OWNER/APPLICANT: Football Northwest LLC, 12 Seahawks Way, Renton,
WA 98056
CONTACT: Alan Foltz, Waterfront Construuction, Inc., 205 NE
Northlake Way, Suite 230, Seattle, WA 98105
PROJECT LOCATION: 12 Seahawks Way
LEGAL DESCRIPTION: See Attachment A
SEC-TWN-R: NE 1/4 Section 31, Township 24N, Range 5E
WITHIN THE SHORELINES OF: Lake Washington
APPLICABLE MASTER PROGRAM: City of Renton
PROPOSAL DESCRIPTION: The applicant has requested an Environmental
Determination, approval of a Shoreline Conditional Use Permit and a Shoreline Substantial
Development Permit for the installation of a pre -manufactured, freestanding platform (boat)
lift in association with an existing dock on Lake Washington, a Shoreline of Statewide
City of Renton Department of Community & Economic Development Shoreline Monogement Permit
Football Northwest Platform Lift LUA09-134, ECF, SM, SMC
DATE OF PERMIT: Page Z cf 3
Significance. The proposed project is associated with the Seattle Seahawks Headquarters and
Training Facility on a 721,580 square foot lot in the Commercial/Office/Residential (COR)
Zone. The proposed platform lift would be transported to the site by barge and positioned by
a barge -mounted crane. All work would take place within the established construction
window for this area of Lake Washington (July 15 through December 31)_
The following section/page of the Master Program is applicable to the development:
RMC Section Description Fade
4-3-090J Urban Environment 3-25
4-3-090K General Use Regulations for All Shoreline Uses 3-26
4-3-090L Specific Use Regulations 3-27
4-3-090M Variances and Conditional Uses 3-39
4-9-1901.1, 2, 3, 5 Variances and Conditional uses 9-54
Development of this project shall be undertaken pursuant to the following terms and
conditions:
1. The applicant shall comply with all construction conditions of State agencies.
This Permit is granted pursuant to the Shoreline Management Action of 1971 and pursuant to
the following:
1. The issuance of a license under the Shoreline Management Act of 1971 shall not release
the applicant from compliance with federal, state, and other permit requirements.
2. This permit may be rescinded pursuant to Section 14(7) of the Shoreline Management
Act of 1971 in the event the permittee fails to comply with any condition(s) hereof.
3. Construction permits shall not be issued until twenty-one (21) days after approval by
the Washington State Department of Ecology or until any review proceedings initiated
within this twenty-one (21) day review period have been completed.
C. E. "Chip" Vincent, Planning Director Date
Planning Division
APPEALS: Appeals of Shoreline Substantial Development Permit issuance must be made
directly to the Shorelines Hearings Board. Appeals are made by filing a request in writing within
the twenty-one (21) days of receipt of the final order and concurrently filing copies of such
request with the Washington State Department of Ecology and the Attorney General's office as
City of Renton Deportment of Community & Economic development Shoreline Management Permit
Football Northwest Platform Lift LVA09-134, ECF, SM, SMC
DATE OF PFRKT: Page 3 of 3
provided in section 18(1) of the Shorelines Management Act of 1971. All copies of appeal
notices shall also be filed with the City of Renton Planning Division and the City Clerk's office.
EXPIRATION: Unless a different time period is specified in the shoreline permit as authorized
by RCW 90.58.143 and subsection J1 of RMC 4-9-190, construction activities, or a use or
activity, for which a permit has been granted pursuant to this Master Program must be
commenced within two (2) years of the effective date of a shoreline permit, or the shoreline
permit shall terminate, and a new permit shall be necessary. However, the Planning Division
may authorize a single extension for a period not to exceed one year based on reasonable
factors, if a request for extension has been filed with the Planning Division before the
expiration date, and notice of the proposed extension is given to parties of record and the
Washington State Department of Ecology, DEFINITION OF COMMENCEMENT OF
CONSTRUCTION ACTIVITIES: the construction applications must be submitted, permits must be
issued, and foundation inspections must be completed before the end of the two (2) year
period.
Attachments:
A. Legal Description
B. Plan View
cc: Attorney General's Office
Owner/Applicant—Football Northwest LLC
Contact — Alan Foltz, Waterfront Construction, Inc.
City of Renton Offical File
A-T-TAc H tAt-7K-F &
LEGAL DESCRIPTION
BAXTER PARCEL SOUTH RENTON LUA-00-044 LUA REG NO 20010105900005 WCH IS PDR OF SVV 114
29-24-05 LY WLY OF BN RR CO RNV
BAXTER PARCEL NORTH RENTON LUA-00-044 LLA REC NO 20010105900005 WCH IS POR OF SW 114
29-24-05 LY WLY OF BN RR CO RIW
-LA l 1 4 v
FRCJEZT OE=IGNEU By
�Va{,�rfratf Cr�isrn..lcti�r� If�c
THIS COCUINENI 15 PROPRIETARY PROPERTY OF WATEF.FRCN1
OONSIRlI(:TIUN INC AND IS NOT TO BE US£D, IN WHOLE OR IN
PhkT, OR ANY OTHER PROJECT WITHOUT THE WRITTEN
AlJTFOPlZATf)N OF WATERFRONT CONSTRUCTION INC_
NMI[=
L I
�X 4 (43 FT -
I
�F.Ij ji-i I
WWY/ 9WHII
top
WAC 220-110-223 Freshwater lake bulkheads. Bio-engincering is the preferred method of bank
protection where practicable. Freshwater lake bullhead projects shall incorporate mitigation measures as
necessary to achieve no -net -loss of productive capacity of fish and shellfish habitat. The following technical
provisions shall apply to freshwater bulkhead projects:
(1) The toe of the bulkhead shall be placed landward of the ordinary high water line.
(2) Rock used for the bulkhead construction shall be composed of clean, angular material of a sufficient
size to prevent its being washed away by high water or wave action.
(3) Material that is waterward of the ordinary high water line shall not be utilized for backfill.
(4) Excavated or dredged material shall not be stockpiled waterward of the ordinary high water line.
(5) All trenches, depressions, or holes created within the ordinary high water line shall be backfilled prior
to inundation by high water or wave action.
(6) All piling, lumber, or other materials treated with preservatives shall be sufficiently cured to minimize
leaching into the water or bed. The use of wood treated with creosote or pentachlorophenol is not allowed in
lakes.
[Statutory Authority: RCW 75.08.080. 94-23-058 (Order 94-160), § 220-110-223, filed 11/14/94, effective 12/15194.]
llatio-a and ops Won of
� a m vvs not znre a IMPA, prmvitied-
1. Equipment is not operated below the ordinary high water line during installation;
2. The hoist is not installed at the mouth of any watercourse; and
3. Dredging, filling, or pile driving is not conducted as part of the project. Freshwater boat hoist, ramp, and
launch projects shall incorporate mitigation measures as necessary to achieve no -net -loss of productive
capacity of fish and shellfish habitat.
The following technical provisions shall apply to boat ramps and launches in freshwater areas.
(1) Structures containing concrete shall be sufficiently cured to prevent leaching prior to contact with
http://www. leg.wa.gov/wac/index . cfm?. useaction=chapter&chapter=220.110&Requ.estfimeout... 7/21/2004
WAC 220 -110 CHAPTER Page 46 of 67
water.
(2) All piling, limber, or other materials treated with preservatives shall be sufficiently cured to minimize
leaching into the water or bed. The use of wood treated with creosote or pentachlorophenol is not allowed in
lakes.
(3) Overburden material resulting from this project shall be deposited so as not to reenter the water.