July 26, 2024
Dante Palmaffy
DBA D Palmaffy Design
12925 47th Dr SE
Everett, WA 98208
SUBJECT: "On Hold" Notice
Billing Short Plat / LUA24-000190
Dear Mr. Palmaffy,
The Planning Division of the City of Renton accepted the above master application for review on July 2, 2024.
During our review, staff has determined that additional information is necessary in order to proceed further.
The following information will need to be submitted before October 26, 2024 so that we may continue the review
of the above subject application:
Engineering
See attached comments from Development Engineering.
Fire
See attached comments from Renton Fire Authority.
At this time, your project has been placed “on hold” pending receipt of the requested information. The maximum
time for resubmittal shall be within ninety (90) days of this notice. Please contact me at (425) 430-7286 if you
have any questions.
Sincerely,
Andrew Van Gordon
Associate Planner
cc: Badanvir Billing / Owner(s)
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: July 23rd, 2024
TO: Andrew Van Gordon, Senior Planner
FROM: Huy Huynh, Civil Engineer II
SUBJECT: Billing Short Plat
14103 160th Ave SE
LUA24-000190
I have reviewed the above-referenced proposal located at parcel(s) 1423059011. The following comments
are based on the Land-Use submittal made to the City of Renton by the applicant.
The following comments represent additional information or corrections that are required to be
made:
1. A preliminary TIR dated August 23, 2022 was submitted with the Land Use Application. Based on
the City of Renton’s flow control map, the site falls within the Flow Control Duration Standard-
Matching Forested and falls within a Flood Problem Flow Control Standard and is within the
Lower Cedar River Drainage Basin. Therefore, the project must match the Existing site conditions
for the 100-year peaks, in addition to matching the Forested site conditions for the 2-year and 10-
year peaks and the discharge durations from 50% of the 2-year peak to the full 50-year peak. The
report is based on a Full drainage review and Core Requirements 1 thru 9 and the six Special
Requirements have been discussed in the Technical Information Report.
a. Flow Control, RSWDM Core Requirement #3: Any proposed detention and/or water
quality vault shall be designed in accordance with the RSWDM that is current at the time
of civil construction permit application. The preliminary TIR claims an exemption from
flow control facility as the new/replaced impervious areas for road asphalt paving,
driveway drop and sidewalk totaled 3,992 SF. Therefore, the project meets the basic
exemption from Core Requirement #3, as less than 5,000 SF of new plus replaced
impervious are proposed, and less than 3/4 areas of new pervious surface will be added.
i. Staff does not concur with the exemption based on the conceptual plan
included with the land use application. The new/replaced impervious surface
area of 3,992 SF does not consider impervious surfaces from new roof areas and
driveways. Based on preliminary take-off, the added impervious surface
exceeds 5000sf. Applicant to revise report
b. Water Quality, RSWDM Core Requirement #8: All projects that add more than 5,000
square feet of pollution generating impervious surface that is not fully dispersed and less
than 0.75 acre of pollution generating pervious surface that is not fully dispersed require
water quality. The TIR states that this project will have under 5,000 sf of new plus replaced
PGIS, therefore not requiring water quality.
i. Staff does not concur with the cited exemption based on the conceptual plan
included with the land use application. Based on preliminary estimate, the fire
turnaround creates over 5000 sqft of pollution generating impervious surface
area. Therefore, water quality is not exempt, and the applicant will be required
to provide basic water quality treatment.
The following comments represent additional information or corrections that should be made when
considering surface water layout and configuration:
1. Flow Control, RSWDM Core Requirement #3: Any proposed detention and/or water quality
vault shall be designed in accordance with the RSWDM that is current at the time of civil
construction permit application. The project proposes a detention facility to meet the flow
control requirement.
a. In the current configuration, the grading associated with the detention facility may
conflict with the critical root zone of saved tree(s) to the east in Lot 3.
b. The vault placement is close to the southern property border at significant depth.
Applicant should show or provide narrative pertaining to planned construction
method; any offsite work will require an executed temporary construction
easement prior to construction permit issuance.
1
Andrew Van Gordon
From:Corey Thomas <cthomas@rentonrfa.org>
Sent:Monday, July 8, 2024 1:51 PM
To:Andrew Van Gordon
Cc:Huy Huynh
Subject:LUA24-000190, Billings Short Plat Comments
Attachments:billingssp.docx; billingssp2.docx
Andrew,
I have concerns about this proposal proceeding. They have not addressed the standard access roadway or
turnaround requirements of 20 feet minimum width on the private roadway and the turnaround. They are showing
a 16-foot roadway and a 16 foot wide hammerhead turnaround.
Also, we stated originally that one new fire hydrant would be required, and they have shown no new
hydrants. There are some other new fire hydrants in this area, however, none of them are within the 300-foot
requirement. There is an existing fire hydrant on the northern property line. There are two issues with this fire
hydrant. It is on a dead end 6 inch water main that will not flow the minimum 1,000 gpm requirement and more
importantly, it is not on a standard usable fire access roadway.
We will not approve construction documents if this is presented as it is now.
I have updated the memo above and included the original memo with the same requirements they have not
addressed.
Up you to your department if you want this proposal to proceed. Thanks.
Corey Thomas, Lead Plans Review Inspector
Renton Regional Fire Authority
Fire Plans Review Section
18002 108th Ave SE, Renton, WA 98055
425-276-9582
cthomas@rentonrfa.org
Professionalism . Integrity . Leadership . Loyalty . Accountability . Respect
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless
you know the content is safe.
M E M O R A N D U M
DATE: February 4, 2022
TO: Andrew Van Gordon, Senior Planner
FROM: Corey Thomas, Lead Plans Review Inspector
SUBJECT: Billings Short Plat
1. The fire flow requirement for a single-family home is 1,000 gpm minimum for dwellings
up to 3,600 square feet (including garage and basements). If the dwelling exceeds 3,600 square
feet, a minimum of 1,500 gpm fire flow would be required. A minimum of one fire hydrant is
required within 300-feet of the proposed buildings and two hydrants if the fire flow goes up to
1,500 gpm. Water in this area of the city is supplied by King County Water District 90. A water
availability certificate shall be required from them. It appears from our records that only a 4-
inch water main is available in this area, this will not be able to supply the minimum fire flow
for the proposed project. Water main extensions and a minimum of one new fire hydrant will
be required. Confirm our findings with the water district for exact existing conditions and
construction requirements to meet the minimum requirements.
2. The fire impact fees are currently applicable at the rate of $829.77 per single family unit.
This fee is paid at building permit issuance. Credit will be granted for the removal of the one
existing home.
3. Fire department apparatus access roadways are required to be a minimum of 20-feet
wide fully paved, with 25-feet inside and 45-feet outside turning radius. Fire access roadways
shall be constructed to support a 30-ton vehicle with 75-psi point loading. Access is required
within 150-feet of all points on the buildings. Dead end streets that exceed 150-feet in length
require an approved turnaround. A hammerhead type turnaround would meet minimum
requirements. See attached specification sheet.
M E M O R A N D U M
DATE: July 8, 2024
TO: Andrew Van Gordon, Senior Planner
FROM: Corey Thomas, Lead Plans Review Inspector
SUBJECT: Billings Short Plat
Environmental Impact Comments:
1. The fire impact fees are currently applicable at the rate of $421.98 per single family unit.
This fee is paid at building permit issuance. Credit will be granted for the removal or retention
of the one existing home.
Fire Code Comments:
1. The fire flow requirement for a single-family home is 1,000 gpm minimum for dwellings
up to 3,600 square feet (including garage and basements). If the dwelling exceeds 3,600 square
feet, a minimum of 1,500 gpm fire flow would be required. A minimum of one fire hydrant is
required within 300-feet of the proposed buildings and two hydrants if the fire flow goes up to
1,500 gpm. Water in this area of the city is supplied by King County Water District 90. A
minimum of one new fire hydrant will be required at the public street access roadway to this
new lot. No new fire hydrant is shown to be proposed. The existing fire hydrant on the north
side of the property is not on the access roadway and is fed by a dead end 6-inch water main
and will not flow the minimum 1,000 gpm requirement.
2. Fire department apparatus access roadways are required to be a minimum of 20-feet
wide fully paved, with 25-feet inside and 45-feet outside turning radius. Fire access roadways
shall be constructed to support a 30-ton vehicle with 75-psi point loading. Access is required
within 150 feet of all points on the buildings. Dead end streets that exceed 150-feet in length
require an approved turnaround. A hammerhead type turnaround would meet minimum
requirements. The proposed hammerhead turnaround and access roadway do not meet
minimum requirements of 20 feet wide and will not be approved.