Loading...
HomeMy WebLinkAboutNOA_Notice_of_Application_180320 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 www.rentonwa.gov If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED, Planning Division, 1055 South Grady Way, Renton, WA 98057. File Name / No.: King County South Plant Biogas and Heating Systems Improvements Project / LUA18-000188, SA-A, CU- H, SME, MOD NAME: MAILING ADDRESS: CITY/STATE/ZIP: TELEPHONE NO.: NOTICE OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 20, 2018 PROJECT NAME: King County South Plant Biogas and Heating Systems Improvements Project PROJECT NUMBER: LUA18-000188, SA-A, CU-H, SME, MOD PROJECT DESCRIPTION: King County is requesting Administrative Site Plan Review, Hearing Examiner Conditional Use Permit, Shoreline Exemption, and a Street Modification to replace South Plant's Biogas Upgrading System (BUS) and heating system to improve the beneficial use of digester gas at King County Wastewater Treatment Division's South Treatment Plant (STP) while also reliably supplying heat to meet process and space heating demands. The proposed project is located at 1200 Monster Rd SW (King County Parcel Nos. 2423049006, 2423049097 and 2423049111). The project site is approximately 4 acres of the 50-acre STP site. The South Plant Biogas and Heating Systems Project would include the construction of a Heat and Energy Recovery Building (HERB), a new thermal oxidizer, heating system improvements within the Digester Equipment Building, and utility connections. The parcel contains one Category IV wetland (Wetland A) and is located approximately 1,000 feet from the Black River and 250 to 450 feet from Springbrook Creek. No work would be completed within either the wetland or the wetland buffer. A flood hazard area associated with Springbrook Creek is mapped on a portion of the project site. A portion of the 4,375 square foot (175-foot by 25-foot) temporary stabilized construction entrance would be located within this area, but no permanent facilities or fill would be located within the mapped flood hazard area. The temporary stabilized construction entrance would provide construction machinery access to the proposed spoils placement area onsite. Construction and use of the temporary construction entrance would occur within a portion of the shoreline jurisdiction of Springbrook Creek. The temporary construction entrance would require approximately 290 cubic yards of cut soil and approximately 120 cubic yards of quarry spalls. Following grading activities on the spoils placement site, the temporary stabilized construction entrance would be removed, grades would be restored to their preconstruction condition, and the area would be permanently stabilized with mulch followed by seeding. Runoff from the building roof and most of the impervious areas would be collected and routed to a detention vault before being discharged to the existing stormwater system onsite. Site improvements include a new driveway around the west and south sides of the HERB, seven uncovered parking stalls north of the HERB, and concrete walkways and equipment staging areas surrounding the HERB on three sides. Runoff from a portion of the asphalt walkway would disperse via sheet flow into new and existing landscaped areas where it would infiltrate. No changes to vehicular or pedestrian access to the site would occur as a result of the proposed project. Primary access to the northern portion of the Plant is via SW 7th St. There are additional driveways located off of Monster Rd SW, Longacres Dr SW and SW Grady Way. No frontage improvements or work within the public rights -of-way are proposed. Roughly 17,000 cubic yards of soil would be excavated and placed on a 1-acre area on open lawn within the center of the STP site. Spoils would be compacted and seeded to match existing grades and vegetation type. Of the 180 assessed trees, 42 significant trees are proposed to be removed. The applicant has submitted an Arborist Report, Wetland Assessment Report, Geotechnical Report, Technical Information Report, Trip Generation Memo, and Standard Stream Study with the application. PROJECT LOCATION: 1200 Monster Rd SW, Renton, WA 98057 PERMITS/REVIEW REQUESTED: Administrative Site Plan Review, Hearing Examiner Conditional Use Permit, Shoreline Exemption, and Street Modification APPLICANT/PROJECT CONTACT PERSON: Chris Dew, King County Wastewater Treatment Division (WTD) / Chris.Dew@kingcounty.gov / 201 S Jackson St., Seattle, WA 98104 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 www.rentonwa.gov If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED, Planning Division, 1055 South Grady Way, Renton, WA 98057. File Name / No.: King County South Plant Biogas and Heating Systems Improvements Project / LUA18-000188, SA-A, CU- H, SME, MOD NAME: MAILING ADDRESS: CITY/STATE/ZIP: TELEPHONE NO.: PUBLIC HEARING: Public hearing is tentatively scheduled for April 24, 2018 before the Renton Hearing Examiner at 11:00 AM, in Renton Council Chambers on the 7th floor of Renton City Hall. Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, Department of Community & Economic Development, 1055 South Grady Way, Renton, WA 98057, by 5:00 p.m. on April 3, 2018. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager at (425) 430-7289. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION DATE OF APPLICATION: MARCH 12, 2018 NOTICE OF COMPLETE APPLICATION: MARCH 20, 2018