HomeMy WebLinkAboutCM_Construction_Mitigation_Description_180308_v1Cho Short Plat
Construction Mitigation Description
Proposed Construction Dates are unknown at the time.
Hours of operation will be between 7 am and 8 pm and primarily on week days, Monday through Friday.
Proposed Hauling and Transportation Routes will be on SE 192nd Street.
If necessary a water truck will be employed to minimize dust and when required traffic control measures
including flagging, signage etc. will be employed.
No special hours for construction or hauling are proposed at the time.