Loading...
HomeMy WebLinkAboutP_Civil_Plans_180309_v1MA T E R I A L S Y M B O L S LI N E T Y P E S Y M B O L S CIVIL LINE DESIGNATIONS YARD PIPING LEGEND TO B E R E M O V E D EX I S T I N G R O C K W A L L EX I S T I N G S T R U C T U R E TO B E R E M O V E D TO B E R E M O V E D EX I S T I N G G R A V E L / VE G E T A T I O N / L A N D S C A P I N G GR A S S - L I N E D CH A N N E L RO C K D R A I N A G E DI T C H CE N T E R L I N E MA T C H L I N E IN V I S I B L E O R H I D D E N L I N E BR E A K L I N E GR I D L I N E BU I L D I N G L I M I T S RO C K E R Y DE M O L I T I O N S Y M B O L S CA S T - I N - P L A C E CO N C R E T E PR E C A S T C O N C R E T E IN S E C T I O N MO R T A R , G R O U T , SA N D O R P L A S T E R QU A R R Y S P A L L S OR R I P R A P NA T U R A L G R O U N D OR G R A D E ( E A R T H ) BA C K F I L L ST E E L O R S T A I N L E S S ST E E L CO N C R E T E M A S O N R Y UN I T BA T T O R F I L L IN S U L A T I O N RI G I D I N S U L A T I O N OR W O O D GR A T I N G O R A C P A V E M E N T IN S E C T I O N CH E C K E R E D P L A T E GR A T I N G ( S P A N I S I N DI R E C T I O N O F M O R E CL O S E L Y S P A C E D B A R S ) GR A T I N G ( T W O W A Y S P A N ) BL O C K R E T A I N I N G W A L L ER O S I O N C O N T R O L SE E D I N G WE T L A N D R E S T O R A T I O N CI V I L S Y M B O L S RE M O V E P I P E TR E E P R O T E C T I O N AB A N D O N P I P E | | | || | =†==†==†==†==†==†==†==†==†==†==†==†== PP PP // // // X X X FENCE CONSTRUCTION FENCE PERIMETER PROTECTION GUARDRAIL HANDRAIL SCREENING WALL SAWCUT EDGE OF GRAVEL ROAD PI P E B E D D I N G A N D FO U N D A T I O N EX I S T I N G C A T C H B A S I N TY P E 2 CA T C H B A S I N T Y P E 2 EX I S T I N G C A T C H B A S I N TY P E 1 CA T C H B A S I N T Y P E 1 IN L E T T Y P E 2 5 0 A EX I S T I N G S T R U C T U R E AB A N D O N I N P L A C E NORTH ARROW ENGINEERING GRAPHIC SCALE (FOR 20 SCALE) TR E E R E M O V A L SL I D E G A T E O P E N I N G AN D D E S I G N A T I O N OP E N I N G O R DE P R E S S I O N I N S L A B OR W A L L LA N D S C A P E A R E A MW GM ST O R M / S E W E R C L E A N O U T AB A N D O N & P L U G P I P E TH R U S T B L O C K EX I S T I N G F I R E H Y D R A N T NE W F I R E H Y D R A N T FI R E D E P A R T M E N T C O N N E C T I O N EX I S T I N G W A T E R M E T E R EX I S T I N G V A L V E NE W V A L V E IR R I G A T I O N C O N T R O L V A L V E PR E S S U R E R E L I E F V A L V E BO L L A R D EX I S T I N G G A S M E T E R EX I S T I N G G A S V A L V E EX S I G N S A N D / O R P O S T S SI G N S A N D / O R P O S T S DE C I D U O U S T R E E CO N I F E R O U S T R E E BR U S H O R T R E E L I N E CU L V E R T SO I L B O R I N G & DE S I G N A T I O N MO N I T O R I N G W E L L MO N U M E N T I N C A S E HO R I Z O N T A L A N D V E R T I C A L CO N T R O L P O I N T SP O T E L E V A T I O N SL O P E EA S E M E N T N O . PI P E I D E N T I F I C A T I O N XX X . X X CA T C H B A S I N P R O T E C T I O N IR R V W W W W W W W W W W CO WW WV GA S V W. S . UP FI N I S H G R A D E E L E V A T I O N TO P O F C U R B ( O R WA L L ) E L E V A T I O N B O T T O M O F C U R B (O R W A L L ) E L E V A T I O N WA T E R S U R F A C E WA T E R S U R F A C E L E V E L WA T E R M A N H O L E EX I S T I N G U T I L I T Y P O L E EX I S T I N G U T I L I T Y P O L E WI T H A N C H O R NE W U T I L I T Y P O L E NE W U T I L I T Y P O L E WI T H A N C H O R PO W E R B O X HA N D H O L E PO W E R O R U T I L T Y VA U L T PO W E R T R A N S F O R M E R EL E C T R I C A L M A N H O L E EL E C T R I C A L B O X SE C T I O N C O R N E R QU A R T E R S E C T I O N CO R N E R TR A F F I C D I R E C T I O N AR R O W TR A F F I C T U R N A R R O W CE N T E R L I N E PR O P E R T Y L I N E HU B XX X XX X XX X UP UP UP HH E C L P LW FO U N D R E B A R A S NO T E D H E R E O N LU M I N A I R E CI T Y W O O D P O L E W/ H P S AN C H O R TE M P O R A R Y J E R S E Y BA R R I E R CO M P O S T S O C K PP ME T A L L A M P P O S T WO O D P O W E R P O L E W / LU M I N A I R E X" X X XX X CO N S T R U C T I O N R E Q U I R E D OU T S I D E C O N S T R U C T I O N LI M I T S PE R V I O U S C O N C R E T E PA V E M E N T I N S E C T I O N CR U S H E D G R A V E L TR E E P R O T E C T I O N ZO N E MA I L B O X C L U S T E R ^ ^ ^^^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^ ^^^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^ ^^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^ ^^^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ ^ ^ ^ ^^ ^ ^ ^ ^ ^ KEY NOTE INDICATOR020 4 0 6 0 1" = 20' EX I S T I N G A S P H A L T TO B E R E M O V E D EX I S T I N G C O N C R E T E TO B E R E M O V E D NE W A S P H A L T CO N C R E T E P A V E M E N T NE W C E M E N T CO N C R E T E S I D E W A L K NE W A S P H A L T CO N C R E T E S I D E W A L K W W W W W W 1. T H I S I S A G E N E R A L L E G E N D S H E E T . N O T A L L T H E I N F O R M A T I O N SH O W N M A Y B E U S E D O N T H I S P R O J E C T . 2. T E S C D E T A I L S S H A L L B E I N A C C O R D A N C E W I T H A P P E N D I X D O F T H E 20 1 7 C I T Y O F R E N T O N S U R F A C E W A T E R D E S I G N M A N U A L 8" SDRNOMINAL PIPE DIAMETER =>THIS CONTRACT PIPING < 12" DIAMETER PIPING 12" DIAMETER INDICATOR POST VALVENON-FREEZE HOSE VALVE (V-X)X = NO. IN SPECIFICATIONS GATE VALVE AND VALVE BOX BUTTERFLY VALVE AND VALVE BOX PLUG VALVE AND VALVE BOX FLEXIBLE COUPLING 90° ELBOW UP 90° ELBOW DOWN BEND < 90° UP BEND < 90° DOWN CONCENTRIC REDUCER CAP OR PLUG CLEANOUT FIRE HYDRANT EX I S T I N G 84" BEPIPE USE IDENTIFICATION.SEE ABBREVIATIONS NON-FREEZE HOSE VALVE WITH HOSE RACK (V-X) X = NO. IN SPECIFICATIONS VALVE BOXVALVE ON EXISTING UTILITIES LDSPRVV V DCVA DETECTOR CHECK VALVE ASSEMBLY (DCVA)CHEMICAL LEAK DETECTION STATION RPBA REVERSE PRESSURE BACKFLOW ASSEMBLYPRVPRESSURE REDUCING VALVEOR 12 5 12 5 TC E PE EX I S T I N G C O N T O U R PR O P O S E D C O N T O U R S EX I S T I N G E A S E M E N T TE M P O R A R Y C O N S T R U C T I O N E A S E M E N T PE R M A N E N T E A S E M E N T PR O P E R T Y L I N E / R I G H T O F W A Y EX I S T I N G G R A D E EX I S T I N G D I T C H XX" SS 57+00/ / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / /CURB AND GUTTER EDGE OF ASPHALT OR CONCRETE CLEARING LIMITS / LIMITS OF CONSTRUCTION DOWN SLOPE ARROW AND VALUE ALIGNMENT STATIONING RAILROAD PAINT STRIPINGVERTICAL CURB WALL GE N E R A L N O T E S GENERAL SYMBOLS 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 0 0 0 0 0 0 1 . d w g | L a y o u t : C 0 0 0 0 0 0 1 M A T E R I A L S A N D S Y M B O L S L E G E N D P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 4 5 : 0 8 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C0000001 D. S a a r e n a s B. I d d i n s E. D a v i d o NONE 0E. Davido 33 7 2 3 CI T Y O F R E N T O N E R O S I O N C O N T R O L NO T E S : 1. B E F O R E A N Y C O N S T R U C T I O N O R D E V E L O P M E N T A C T I V I T Y O C C U R S , A PR E - C O N S T R U C T I O N M E E T I N G M U S T B E H E L D W I T H T H E C I T Y O F RE N T O N , P U B L I C W O R K S D E S I G N E N G I N E E R . 2. A L L L I M I T S O F C L E A R I N G A N D A R E A S O F V E G E T A T I O N P R E S E R V A T I O N A S PR E S C R I B E D O N T H E P L A N ( S ) S H A L L B E C L E A R L Y F L A G G E D I N T H E F I E L D AN D O B S E R V E D D U R I N G C O N S T R U C T I O N . 3. A L L R E Q U I R E D S E D I M E N T A T I O N / E R O S I O N C O N T R O L F A C I L I T I E S M U S T B E CO N S T R U C T E D A N D I N O P E R A T I O N P R I O R T O L A N D C L E A R I N G A N D / O R CO N S T R U C T I O N T O E N S U R E T H A T S E D I M E N T L A D E N W A T E R D O E S N O T EN T E R T H E N A T U R A L D R A I N A G E S Y S T E M . A L L E R O S I O N A N D S E D I M E N T FA C I L I T I E S S H A L L B E M A I N T A I N E D I N A S A T I S F A C T O R Y C O N D I T I O N U N T I L SU C H T I M E T H A T C L E A R I N G A N D / O R C O N S T R U C T I O N I S C O M P L E T E A N D PO T E N T I A L F O R O N - S I T E E R O S I O N H A S P A S S E D . T H E I M P L E M E N T A T I O N , MA I N T E N A N C E , R E P L A C E M E N T A N D A D D I T I O N S T O ER O S I O N / S E D I M E N T A T I O N C O N T R O L S Y S T E M S S H A L L B E T H E RE S P O N S I B I L I T Y O F T H E P E R M I T E E . 4. T H E E R O S I O N A N D S E D I M E N T A T I O N C O N T R O L S Y S T E M S D E P I C T E D O N TH I S D R A W I N G A R E I N T E N D E D T O B E M I N I M U M R E Q U I R E M E N T S T O M E E T AN T I C I P A T E D S I T E C O N D I T I O N S . A S C O N S T R U C T I O N P R O G R E S S E S A N D UN E X P E C T E D O R S E A S O N A L C O N D I T I O N S D I C T A T E , T H E P E R M I T E E SH A L L A N T I C I P A T E T H A T M O R E E R O S I O N A N D S E D I M E N T A T I O N C O N T R O L FA C I L I T I E S W I L L B E N E C E S S A R Y T O E N S U R E C O M P L E T E S I L T A T I O N CO N T R O L O N T H E P R O P O S E D S I T E . D U R I N G T H E C O U R S E O F CO N S T R U C T I O N , I T S H A L L B E T H E O B L I G A T I O N A N D R E S P O N S I B I L I T Y O F TH E P E R M I T E E T O A D D R E S S A N Y N E W C O N D I T I O N S T H A T M A Y B E CR E A T E D B Y T H E A C T I V I T I E S A N D T O P R O V I D E A D D I T I O N A L F A C I L I T I E S , OV E R A N D A B O V E M I N I M U M R E Q U I R E M E N T S , A S M A Y B E N E E D E D , T O PR O T E C T A D J A C E N T P R O P E R T I E S A N D W A T E R Q U A L I T Y O F T H E RE C E I V I N G D R A I N A G E S Y S T E M . 5. A P P R O V A L O F T H I S P L A N I S F O R E R O S I O N / S E D I M E N T A T I O N C O N T R O L ON L Y . I T D O E S N O T C O N S T I T U T E A N A P P R O V A L O F S T O R M D R A I N A G E DE S I G N , S I Z E N O R L O C A T I O N O F P I P E S , R E S T R I C T O R S , C H A N N E L S , O R RE T E N T I O N F A C I L I T I E S . 6. D U R I N G T H E T I M E P E R I O D O F O C T O B E R 1 S T T H R O U G H A P R I L 3 0 T H , A L L PR O J E C T D I S T R I B U T E D S O I L A R E A S G R E A T E R T H A N 5 , 0 0 0 S Q U A R E F E E T , TH A T A R E T O B E L E F T U N - W O R K E D F O R M O R E T H A N 1 2 H O U R S , S H A L L BE C O V E R E D B Y M U L C H , S O D D I N G O R P L A S T I C C O V E R I N G . 7. I N A N Y A R E A W H I C H H A S B E E N S T R I P P E D O F V E G E T A T I O N A N D W H E R E NO F U R T H E R W O R K I S A N T I C I P A T E D F O R A P E R I O D 3 0 D A Y S O R M O R E , AL L D I S T U R B E D A R E A S M U S T B E I M M E D I A T E L Y S T A B I L I Z E D W I T H MU L C H I N G , G R A S S P L A N T I N G O R O T H E R A P P R O V E D E R O S I O N C O N T R O L TR E A T M E N T A P P L I C A B L E T O T H E T I M E O F Y E A R . G R A S S S E E D I N G AL O N E W I L L B E A C C E P T A B L E O N L Y D U R I N G T H E M O N T H S O F A P R I L TH R O U G H S E P T E M B E R , I N C L U S I V E . S E E D I N G M A Y P R O C E E D , H O W E V E R , WH E N E V E R I T I S I N T H E I N T E R E S T O F T H E P E R M I T E E , B U T M U S T B E AU G M E N T E D W I T H M U L C H I N G , N E T T I N G O R O T H E R T R E A T M E N T AP P R O V E D B Y T H E C I T Y O F R E N T O N , O U T S I D E T H E S P E C I F I E D T I M E PE R I O D . 8. F O R A L L E R O S I O N / S E D I M E N T A T I O N C O N T R O L P O N D S W H E R E T H E D E A D ST O R A G E D E P T H E X C E E D S 6 I N C H E S , A F E N C E I S R E Q U I R E D W I T H A MI N I M U M H E I G H T O F T H R E E ( 3 ) F E E T , 3 : 1 S I D E S L O P E S . 9. A T E M P O R A R Y G R A V E L C O N S T R U C T I O N E N T R A N C E , 2 4 F E E T X 5 0 F E E T X 8 I N C H E S O F 4 T O 6 I N C H Q U A R R Y S P A L L S S H A L L B E L O C A T E D A T A L L PO I N T S O F V E H I C U L A R I N G R E S S A N D E G R E S S T O T H E C O N S T R U C T I O N SI T E . CI T Y O F R E N T O N S A N I T A R Y S E W E R NO T E S A N D S P E C I F I C A T I O N S : 1. A L L W O R K A N D W O R K M A T E R I A L S H A L L B E I N C O N F O R M A N C E W I T H T H E ST A N D A R D S A N D S P E C I F I C A T I O N S O F T H E C I T Y O F R E N T O N PL A N N I N G / B U I L D I N G / P U B L I C W O R K S D E P A R T M E N T A N D T H E L A T E S T ED I T I O N O F T H E W S D O T / A P W A S T A N D A R D S A N D S P E C I F I C A T I O N S , A S AP P R O V E D A N D M O D I F I E D B Y T H E C I T Y O F R E N T O N I N T H E R E N T O N ST A N D A R D P L A N S & S P E C I F I C A T I O N S . A S E T O F A P P R O V E D P L A N S S H A L L BE K E P T O N S I T E A T A L L T I M E S D U R I N G C O N S T R U C T I O N . 2. T H E H O U R S O F W O R K I N T H E S T R E E T R I G H T O F W A Y S H A L L B E P E R C I T Y SP E C I F I C A T I O N S O N W E E K D A Y S U N L E S S O T H E R W I S E A P P R O V E D I N WR I T I N G B Y T H E P L A N N I N G / B U I L D I N G / P U B L I C W O R K S D E P A R T M E N T . A N AP P R O V E D T R A F F I C C O N T R O L P L A N M U S T B E O B T A I N E D P R I O R T O BE G I N N I N G A N Y W O R K W I T H I N P U B L I C R I G H T O F W A Y . 3. A L L L O C A T I O N S O F E X I S T I N G U T I L I T I E S S H O W N A R E A P P R O X I M A T E A N D I T SH A L L B E T H E C O N T R A C T O R ' S R E S P O N S I B I L I T Y T O V E R I F Y T H E T R U E A N D CO R R E C T L O C A T I O N S O A S T O A V O I D D A M A G E O R D I S T U R B A N C E . 4. A P R E - C O N S T R U C T I O N C O N F E R E N C E A N D A 2 4 H O U R N O T I C E S H A L L B E RE Q U I R E D P R I O R T O S T A R T I N G N E W C O N S T R U C T I O N . I T S H A L L B E T H E CO N T R A C T O R ' S R E S P O N S I B I L I T Y T O S E C U R E A L L N E C E S S A R Y P E R M I T S PR I O R T O S T A R T I N G C O N S T R U C T I O N . ( I N S P E C T I O N W I L L B E AC C O M P L I S H E D B Y A R E P R E S E N T A T I V E O F T H E C I T Y O F R E N T O N . ) I T SH A L L B E T H E C O N T R A C T O R ' S R E S P O N S I B I L I T Y T O N O T I F Y T H E P U B L I C WO R K S I N S P E C T O R 2 4 H O U R S I N A D V A N C E O F B A C K F I L L I N G A L L CO N S T R U C T I O N . 5. C O N T R A C T O R I S S O L E L Y R E S P O N S I B L E F O R T H E M E A N S , M E T H O D S A N D SE Q U E N C E S O F C O N S T R U C T I O N A N D F O R T H E S A F E T Y O F W O R K E R S A N D OT H E R S O N T H E C O N S T R U C T I O N S I T E . 6. I T S H A L L B E T H E R E S P O N S I B I L I T Y O F T H E C O N T R A C T O R T O O B T A I N ST R E E T U S E A N D A N Y O T H E R R E L A T E D P E R M I T S P R I O R T O A N Y CO N S T R U C T I O N . 7. P L A N S A P P R O V E D B Y T H E C I T Y O F R E N T O N , P U B L I C W O R K S D E P A R T M E N T SH A L L T A K E P R E C E D E N C E O V E R A L L O T H E R P L A N S . 8. A C O P Y O F T H E S E A P P R O V E D P L A N S M U S T B E O N T H E J O B S I T E WH E N E V E R C O N S T R U C T I O N I S I N P R O G R E S S . 9. T H E C O N T R A C T O R S H A L L P R O V I D E T H E C I T Y O F R E N T O N W I T H A N AS - B U I L T D R A W I N G O F T H E S A N I T A R Y S E W E R S Y S T E M , W H I C H H A S B E E N ST A M P E D A N D S I G N E D B Y A L I C E N S E D P R O F E S S I O N A L E N G I N E E R O R LI C E N S E D P R O F E S S I O N A L S U R V E Y O R . 10 . B A C K F I L L S H A L L B E P L A C E D E Q U A L L Y O N B O T H S I D E S O F T H E P I P E I N LA Y E R S W I T H A L O O S E A V E R A G E D E P T H O F 6 I N C H E S , M A X I M U M D E P T H OF 8 I N C H E S , T H O R O U G H L Y T A M P I N G E A C H L A Y E R T O 9 5 P E R C E N T O F MA X I M U M D E N S I T Y . T H E S E C O M P A C T E D L A Y E R S M U S T E X T E N D F O R O N E PI P E D I A M E T E R O N E A C H S I D E O F T H E P I P E O R T O T H E S I D E O F T H E TR E N C H . M A T E R I A L S T O C O M P L E T E T H E F I L L O V E R P I P E S H A L L B E T H E SA M E A S D E S C R I B E D . 11 . O P E N C U T R O A D C R O S S I N G S F O R U T I L I T Y T R E N C H E S O N E X I S T I N G TR A V E L E D R O A D W A Y S H A L L B E B A C K F I L L E D W I T H C R U S H E D R O C K A N D ME C H A N I C A L L Y C O M P A C T E D U N L E S S O T H E R W I S E A P P R O V E D B Y T H E CI T Y O F R E N T O N . 12 . D A T U M F O R V E R T I C A L C O N T R O L S H A L L B E N O R T H A M E R I C A N V E R T I C A L DA T U M 1 9 8 8 M E T E R S , A N D F O R H O R I Z O N T A L C O N T R O L S H A L L B E N O R T H AM E R I C A N D A T U M 1 9 8 3 / 1 9 9 1 M E T E R S U N L E S S O T H E R W I S E A P P R O V E D B Y TH E C I T Y O F R E N T O N P U B L I C W O R K S D E P A R T M E N T . R E F E R E N C E BE N C H M A R K A N D E L E V A T I O N S A R E N O T E D O N T H E P L A N S . 13 . A L L D I S T U R B E D A R E A S S H A L L B E S E E D E D A N D M U L C H E D O R O T H E R W I S E ST A B I L I Z E D T O T H E S A T I S F A C T I O N O F T H E D E P A R T M E N T F O R T H E PR E V E N T I O N O F O N - S I T E E R O S I O N A F T E R T H E C O M P L E T I O N O F CO N S T R U C T I O N . 14 . A L L P I P E A N D A P P U R T E N A N C E S S H A L L B E L A I D O N A P R O P E R L Y PR E P A R E D F O U N D A T I O N I N A C C O R D A N C E W I T H T H E S T A N D A R D S A N D SP E C I F I C A T I O N S O F T H E C I T Y O F R E N T O N P L A N N I N G / B U I L D I N G / P U B L I C WO R K S D E P A R T M E N T A N D T H E L A T E S T E D I T I O N O F T H E W S D O T / A P W A ST A N D A R D S A N D S P E C I F I C A T I O N S , A S A P P R O V E D A N D M O D I F I E D B Y T H E CI T Y O F R E N T O N I N T H E R E N T O N S T A N D A R D P L A N S & S P E C I F I C A T I O N S . TH I S S H A L L I N C L U D E N E C E S S A R Y L E V E L I N G O F T H E T R E N C H B O T T O M O R TH E T O P O F T H E F O U N D A T I O N M A T E R I A L , A S W E L L A S P L A C E M E N T A N D CO M P A C T I O N O F R E Q U I R E D B E D D I N G M A T E R I A L , T O U N I F O R M G R A D E S O TH A T T H E E N T I R E L E N G T H O F T H E P I P E W I L L B E S U P P O R T E D O N A UN I F O R M L Y D E N S E , U N Y I E L D I N G B A S E . P I P E B E D D I N G S H A L L B E P E A GR A V E L 6 I N C H E S A B O V E A N D B E L O W T H E P I P E . 15 . S A N I T A R Y S E W E R P I P E S H A L L B E P O L Y V I N Y L C H L O R I D E ( P V C ) R U B B E R GA S K E T E D A S T M D 3 0 3 4 , S D R 3 5 , O R D U C T I L E I R O N C L A S S 5 0 , U N L E S S OT H E R W I S E A P P R O V E D B Y T H E W A S T E W A T E R U T I L I T Y . 16 . I N U N I M P R O V E D A R E A S , M A N H O L E T O E X T E N D M I N I M U M 6 I N C H E S A N D MA X I M U M 1 2 I N C H E S A B O V E F I N I S H E D G R A D E O R M U S T H A V E M I N I M U M 2 ' DI A M E T E R C O N C R E T E R I N G P O U R E D A T G R A D E . I N P A V E D A R E A , C O V E R MU S T S L O P E I N A L L D I R E C T I O N S T O M A T C H P A V I N G . CI T Y O F R E N T O N S U R F A C E W A T E R DR A I N A G E N O T E S A N D SP E C I F I C A T I O N S : 1. B E F O R E A N Y C O N S T R U C T I O N O R D E V E L O P M E N T A C T I V I T Y O C C U R S , A PR E - C O N S T R U C T I O N M E E T I N G M U S T B E H E L D W I T H T H E C I T Y O F RE N T O N P L A N R E V I E W E R . 2. A L L C O N S T R U C T I O N S H A L L B E I N A C C O R D A N C E W I T H T H E 1 9 9 6 ST A N D A R D S P E C I F I C A T I O N S F O R R O A D , B R I D G E A N D M U N I C I P A L CO N S T R U C T I O N P R E P A R E D B Y W S D O T A N D T H E A M E R I C A N P U B L I C WO R K S A S S O C I A T I O N ( A P W A ) , A S A M E N D E D B Y T H E C I T Y O F R E N T O N PU B L I C W O R K S D E P A R T M E N T . 3. T H E S U R F A C E W A T E R D R A I N A G E S Y S T E M S H A L L B E C O N S T R U C T E D AC C O R D I N G T O T H E A P P R O V E D P L A N S , W H I C H A R E O N F I L E I N T H E PU B L I C W O R K S D E P A R T M E N T . A N Y D E V I A T I O N F R O M T H E A P P R O V E D PL A N S W I L L R E Q U I R E W R I T T E N A P P R O V A L F R O M T H E C I T Y O F R E N T O N PU B L I C W O R K S D E P A R T M E N T , S U R F A C E W A T E R U T I L I T Y S E C T I O N . 4. A C O P Y O F T H E S E A P P R O V E D P L A N S M U S T B E O N T H E J O B S I T E WH E N E V E R C O N S T R U C T I O N I S I N P R O G R E S S . 5. D A T U M F O R V E R T I C A L C O N T R O L S H A L L B E N O R T H A M E R I C A N V E R T I C A L DA T U M 1 9 8 8 M E T E R S , A N D F O R H O R I Z O N T A L C O N T R O L S H A L L B E N O R T H AM E R I C A N D A T U M 1 9 8 3 / 1 9 9 1 M E T E R S U N L E S S O T H E R W I S E A P P R O V E D BY T H E C I T Y O F R E N T O N P U B L I C W O R K S D E P A R T M E N T . R E F E R E N C E BE N C H M A R K A N D E L E V A T I O N S A R E N O T E D O N T H E P L A N S . 6. A L L S E D I M E N T A T I O N / E R O S I O N F A C I L I T I E S M U S T B E I N O P E R A T I O N P R I O R TO C L E A R I N G A N D B U I L D I N G C O N S T R U C T I O N , A N D T H E Y M U S T B E SA T I S F A C T O R I L Y M A I N T A I N E D U N T I L C O N S T R U C T I O N I S C O M P L E T E D A N D TH E P O T E N T I A L F O R O N - S I T E E R O S I O N H A S P A S S E D . 7. A L L R E T E N T I O N / D E T E N T I O N F A C I L I T I E S M U S T B E I N S T A L L E D A N D I N OP E R A T I O N P R I O R T O O R I N C O N J U N C T I O N W I T H A L L C O N S T R U C T I O N AC T I V I T Y U N L E S S O T H E R W I S E A P P R O V E D B Y T H E P U B L I C W O R K S DE P A R T M E N T , S U R F A C E W A T E R U T I L I T Y S E C T I O N . 8. G R A S S S E E D M A Y B E A P P L I E D B Y H Y D R O S E E D I N G . T H E G R A S S S E E D MI X T U R E , O T H E R T H A N C I T Y O F R E N T O N A P P R O V E D S T A N D A R D M I X E S , SH A L L B E S U B M I T T E D B Y A L A N D S C A P E A R C H I T E C T A N D A P P R O V E D B Y TH E P U B L I C W O R K S D E P A R T M E N T , S U R F A C E W A T E R U T I L I T Y S E C T I O N . 9. A L L P I P E A N D A P P U R T E N A N C E S S H A L L B E L A I D O N A P R O P E R L Y PR E P A R E D F O U N D A T I O N I N A C C O R D A N C E W I T H S E C T I O N 7 - 0 2 . 3 ( 1 ) O F TH E C U R R E N T S T A T E O F W A S H I N G T O N S T A N D A R D S P E C I F I C A T I O N F O R RO A D A N D B R I D G E C O N S T R U C T I O N . T H I S S H A L L I N C L U D E N E C E S S A R Y LE V E L I N G O F T H E T R E N C H B O T T O M O R T H E T O P O F T H E F O U N D A T I O N MA T E R I A L , A S W E L L A S P L A C E M E N T A N D C O M P A C T I O N O F R E Q U I R E D BE D D I N G M A T E R I A L , T O U N I F O R M G R A D E S O T H A T T H E E N T I R E L E N G T H OF T H E P I P E W I L L B E S U P P O R T E D O N A U N I F O R M L Y D E N S E , U N Y I E L D I N G BA S E . A L L P I P E B E D D I N G S H A L L B E A P W A C L A S S “ C ” , W I T H T H E EX C E P T I O N O F P V C P I P E . A L L T R E N C H B A C K F I L L S H A L L B E C O M P A C T E D TO M I N I M U M 9 5 % F O R P A V E M E N T A N D S T R U C T U R A L F I L L A N D 9 0 % OT H E R W I S E P E R A S T M D - 1 5 5 7 - 7 0 . P E A G R A V E L B E D D I N G S H A L L B E 6 IN C H E S O V E R A N D U N D E R P V C P I P E . 10 . G A L V A N I Z E D S T E E L P I P E A N D A L U M I N I Z E D S T E E L P I P E F O R A L L DR A I N A G E F A C I L I T I E S S H A L L H A V E A S P H A L T T R E A T M E N T # 1 O R B E T T E R IN S I D E A N D O U T S I D E . 11 . S T R U C T U R E S S H A L L N O T B E P E R M I T T E D W I T H I N 1 0 F E E T O F T H E S P R I N G LI N E O F A N Y S T O R M D R A I N A G E P I P E , O R 1 5 F E E T F R O M T H E T O P O F A N Y CH A N N E L B A N K . 12 . A L L C A T C H B A S I N G R A T E S S H A L L B E D E P R E S S E D 0 . 1 0 F E E T B E L O W PA V E M E N T L E V E L . 13 . O P E N C U T R O A D C R O S S I N G S T H R O U G H E X I S T I N G P U B L I C R I G H T O F W A Y WI L L N O T B E A L L O W E D U N L E S S S P E C I F I C A L L Y A P P R O V E D B Y C I T Y O F RE N T O N P L A N N I N G / B U I L D I N G / P U B L I C W O R K S A D M I N I S T R A T O R . 14 . R O C K F O R E R O S I O N P R O T E C T I O N O F R O A D S I D E D I T C H E S , W H E R E RE Q U I R E D , S H A L L B E O F S O U N D Q U A R R Y R O C K P L A C E D T O A D E P T H O F ON E ( 1 ) F O O T A N D M U S T M E E T T H E F O L L O W I N G S P E C I F I C A T I O N S : 4 - 8 IN C H R O C K / 4 0 - 7 0 % P A S S I N G ; 2 - 4 I N C H R O C K / 3 0 - 4 0 % P A S S I N G ; A N D LE S S T H A N 2 I N C H R O C K / 1 0 - 2 0 % P A S S I N G . 15 . A L L B U I L D I N G D O W N S P O U T S A N D F O O T I N G D R A I N S S H A L L B E CO N N E C T E D T O T H E S T O R M D R A I N A G E S Y S T E M , U N L E S S A P P R O V E D B Y TH E C I T Y P L A N R E V I E W E R O R S U R F A C E W A T E R U T I L I T Y S E C T I O N . A N AC C U R A T E L Y D I M E N S I O N E D , C E R T I F I E D A S - B U I L T D R A W I N G O F T H I S DR A I N A G E S Y S T E M W I L L B E S U B M I T T E D T O T H E C I T Y U P O N CO M P L E T I O N . 16 . I S S U A N C E O F T H E B U I L D I N G O R C O N S T R U C T I O N P E R M I T S B Y T H E C I T Y OF R E N T O N D O E S N O T R E L I E V E T H E O W N E R O F T H E C O N T I N U I N G L E G A L OB L I G A T I O N A N D / O R L I A B I L I T Y C O N N E C T E D W I T H S T O R M S U R F A C E WA T E R D I S P O S I T I O N . F U R T H E R , T H E C I T Y O F R E N T O N D O E S N O T AC C E P T A N Y O B L I G A T I O N F O R T H E P R O P E R F U N C T I O N I N G A N D MA I N T E N A N C E O F T H E S Y S T E M P R O V I D E D D U R I N G C O N S T R U C T I O N . 17 . T H E C O N T R A C T O R S H A L L B E R E S P O N S I B L E F O R P R O V I D I N G A D E Q U A T E SA F E G U A R D , S A F E T Y D E V I C E S , P R O T E C T I V E E Q U I P M E N T , F L A G G E R S , AN D A N Y O T H E R N E E D E D A C T I O N S T O P R O T E C T T H E L I F E , H E A L T H , A N D SA F E T Y O F T H E P U B L I C , A N D T O P R O T E C T P R O P E R T Y I N C O N N E C T I O N WI T H T H E P E R F O R M A N C E O F W O R K C O V E R E D B Y T H E C O N T R A C T . A N Y WO R K W I T H I N T H E T R A V E L E D R I G H T O F W A Y T H A T M A Y I N T E R R U P T NO R M A L T R A F F I C F L O W S H A L L R E Q U I R E A T R A F F I C C O N T R O L P L A N AP P R O V E B Y T H E P U B L I C W O R K S D E P A R T M E N T , T R A N S P O R T A T I O N SY S T E M S D I V I S I O N . A L L S E C T I O N S O F T H E W S D O T S T A N D A R D SP E C I F I C A T I O N S 1 - 0 7 - 2 3 T R A F F I C C O N T R O L S H A L L A P P L Y . 18 . S P E C I A L D R A I N A G E M E A S U R E S W I L L B E R E Q U I R E D I F T H E P R O J E C T LO C A T I O N I S W I T H I N T H E A Q U I F E R P R O T E C T I O N A R E A ( A P A ) . CI T Y O F R E N T O N W A T E R U T I L I T Y NO T E S A N D S P E C I F I C A T I O N S : 1. A L L W O R K M A T E R I A L S H A L L B E I N C O N F O R M A N C E W I T H T H E S T A N D A R D S AN D S P E C I F I C A T I O N S O F T H E C I T Y O F R E N T O N PL A N N I N G / B U I L D I N G / P U B L I C W O R K S D E P A R T M E N T A N D T H E L A T E S T ED I T I O N O F T H E W S D O T / A P W A S T A N D A R D S A N D S P E C I F I C A T I O N S , A S AP P R O V E D A N D M O D I F I E D B Y T H E C I T Y O F R E N T O N I N T H E R E N T O N ST A N D A R D P L A N S & S P E C I F I C A T I O N S . A S E T O F A P P R O V E D P L A N S S H A L L BE K E P T O N S I T E A T A L L T I M E S D U R I N G C O N S T R U C T I O N . 2. T H E H O U R S O F W O R K I N T H E S T R E E T R I G H T O F W A Y S H A L L B E L I M I T E D T O 8: 3 0 A M T O 3 : 3 0 P M O N W E E K D A Y S U N L E S S O T H E R W I S E A P P R O V E D I N WR I T I N G B Y T H E P U B L I C W O R K S D E P A R T M E N T A T ( 4 2 5 ) 4 3 0 - 7 3 0 1 . T H E PO L I C E D E P A R T M E N T , F I R E D E P A R T M E N T , A N D 9 1 1 S H A L L B E N O T I F I E D 2 4 HO U R S I N A D V A N C E O F A N Y W O R K I N T H E R I G H T O F W A Y . 3. A L L L O C A T I O N S O F E X I S T I N G U T I L I T I E S S H O W N A R E A P P R O X I M A T E A N D I T SH A L L B E T H E C O N T R A C T O R ' S R E S P O N S I B I L I T Y T O V E R I F Y T H E T R U E A N D CO R R E C T L O C A T I O N S O A S T O A V O I D D A M A G E O R D I S T U R B A N C E . F O R UT I L I T Y L O C A T E S C A L L 4 8 - H O U R L O C A T O R S 8 0 0 - 4 2 4 - 5 5 5 5 . 4. A N A P P R O V E D T R A F F I C C O N T R O L P L A N I S R E Q U I R E D T O B E S U B M I T T E D AT T H E P R E - C O N S T R U C T I O N M E E T I N G . 5. D A T U M F O R V E R T I C A L C O N T R O L S H A L L B E N O R T H A M E R I C A N V E R T I C A L DA T U M 1 9 8 8 M E T E R S , A N D F O R H O R I Z O N T A L C O N T R O L S H A L L B E N O R T H AM E R I C A N D A T U M 1 9 8 3 / 1 9 9 1 M E T E R S U N L E S S O T H E R W I S E A P P R O V E D B Y TH E C I T Y O F R E N T O N P U B L I C W O R K S D E P A R T M E N T . R E F E R E N C E BE N C H M A R K A N D E L E V A T I O N S A R E N O T E D O N T H E P L A N S . 6. A L L W A T E R M A I N P I P E I S T O B E C E M E N T L I N E D D U C T I L E I R O N P I P E CO N F O R M I N G T O A W W A C 1 1 0 A N D C 1 1 1 O R L A T E S T R E V I S I O N , T H I C K N E S S CL A S S 5 2 . C E M E N T M O R T A R L I N I N G A N D S E A L C O A T I N G S H A L L C O N F O R M TO A W W A C 1 0 4 O R L A T E S T R E V I S I O N . P I P E J O I N T S T O B E P U S H - O N O R ME C H A N I C A L J O I N T . B E D D I N G T O B E C L A S S C . A L L D U C T I L E I R O N P I P E AN D F I T T I N G S S H A L L B E P O L Y E T H Y L E N E W R A P P E D P E R A N S I / A W W A C1 0 5 / A 2 1 . 5 - 9 3 S T A N D A R D S . 7. C A S T I R O N A N D D U C T I L E I R O N F I T T I N G S S H A L L B E C E M E N T L I N E D , PR E S S U R E R A T E D A S N O T E D O N P L A N S , A N D I N A C C O R D A N C E W I T H AN S I / A W W A C 1 1 0 / A 2 1 . 1 0 - 8 7 . C E M E N T L I N I N G S H A L L B E I N A C C O R D A N C E WI T H A N S I / A W W A C 1 0 4 / 4 2 1 / 4 - 9 0 . I F F I T T I N G S A R E 3 T O 1 2 I N C H E S I N DI A M E T E R A N D H A V E M E C H A N I C A L J O I N T S , T H E F I T T I N G S S H A L L I N AC C O R D A N C E W I T H E I T H E R A N S I / A W W A C 1 1 0 - A 2 1 . 1 0 - 8 7 O R A N S I / A W W A C1 5 3 / A 2 1 . 5 3 - 9 4 . T H R E E ( 3 ) I N C H T O 1 2 I N C H D I A M E T E R F I T T I N G S , W H I C H HA V E M E C H A N I C A L J O I N T S A N D / O R F L A N G E D J O I N T S , S H A L L B E I N AC C O R D A N C E W I T H A N S I / A W W A C 1 1 0 / A 2 1 . 1 0 . 8 7 O R A C O M B I N A T I O N O F AN S I / A W W A C 1 1 0 / A 2 1 . 1 0 . 8 7 A N D A N S I / A W W A C 1 5 3 / A 2 1 . 5 3 - 9 4 S U C H T H A T TH E P O R T I O N O F T H E F I T T I N G W I T H A M E C H A N I C A L J O I N T ( S ) M A Y B E W I T H AN S I / A W W A C 1 5 3 / A 2 1 . 5 3 - 9 4 A N D T H A T P O R T I O N O F T H E F I T T I N G W I T H FL A N G E D J O I N T ( S ) S H A L L B E I N A C C O R D A N C E W I T H A W W A C 1 1 0 / A 2 1 . 1 0 - 8 7 . AC C E P T A N C E T E S T I N G I N A C C O R D A N C E W I T H S E C T I O N 5 3 . 5 3 O F A N S I / AW W A S E C T I O N 1 0 - 4 . 3 O F A N S I / A W W A C 1 1 0 / A 2 1 . 1 0 8 7 S H A L L B E O B T A I N E D BY T H E C O N T R A C T O R A N D T R A N S M I T T E D T O T H E O W N E R . 8. G A T E V A L V E S S H A L L B E I R O N B O D Y , B R O N Z E D - M O U N T E D , D O U B L E D I S C WI T H B R O N Z E W E D G I N G D E V I C E A N D O - R I N G S T U F F I N G B O X ( A W W A C 5 0 0 ) OR O F R E S I L I E N T S E A T E D T Y P E ( A W W A C 5 0 9 ) . V A L V E S S H A L L B E DE S I G N E D F O R A M I N I M U M W A T E R O P E R A T I N G P R E S S U R E O F 2 0 0 P S I . GA T E V A L V E S S H A L L B E C L O W L I S T 1 4 , M U E L L E R C O M P A N Y N O . A 2 3 8 0 O R M & H . 9. F I R E H Y D R A N T S S H A L L B E C O R E Y T Y P E ( O P E N I N G W I T H T H E P R E S S U R E ) OR C O M P R E S S I O N T Y P E O P E N I N G A G A I N S T P R E S S U R E ) C O N F O R M I N G T O AW W A C - 5 0 2 - 8 5 W I T H A 6 I N C H M E C H A N I C A L J O I N T I N L E T A N D A M A I N VA L V E O P E N I N G ( M . V . O . ) O F 5 - 1 / 4 I N C H , T W O 2 - 1 / 2 I N C H H O S E N O Z Z L E S WI T H N A T I O N A L S T A N D A R D T H R E A D S 7 - 1 / 2 T H R E A D S P E R I N C H A N D O N E 4 IN C H P U M P E R N O Z Z L E W I T H T H E N E W S E A T T L E P A T T E R N 6 T H R E A D S P E R IN C H , 6 0 D E G R E E S V . T H R E A D S : O U T S I D E D I A M E T E R O F M A L E T H R E A D 4. 8 7 5 A N D R O O T D I A M E T E R 4 . 6 2 6 3 . H Y D R A N T S S H A L L H A V E A 1 - 1 / 4 I N C H PE N T A G O N O P E R A T I N G N U T O P E N E D B Y T U R N I N G C O U N T E R C L O C K W I S E (L E F T ) . 10 . T H E T W O 2 - 1 / 2 I N C H H O S E N O Z Z L E S S H A L L B E F I T T E D W I T H C A S T I R O N TH R E A D E D C A P S W I T H O P E R A T I N G N U T O F T H E S A M E D E S I G N A N D PR O P O R T I O N S A S T H E H Y D R A N T S T E M N U T . C A P S S H A L L B E F I T T E D W I T H SU I T A B L E N E O P R E N E G A S K E T S F O R P O S I T I V E W A T E R T I G H T N E S S U N D E R TE S T P R E S S U R E S . 11 . T H E 4 I N C H P U M P E R N O Z Z L E S H A L L B E F I T T E D W I T H A S T O R Z A D A P T E R , 4 IN C H S E A T T L E T H R E A D X 5 I N C H S T O R Z . S T O R Z A D A P T E R S H A L L B E FO R G E D A N D / O R E X T R U D E D 6 0 6 1 - T 6 A L U M I N U M A L L O Y , H A R D C O A T AN O D I Z E D . T H R E A D E D E N D P O R T I O N S H A L L H A V E N O L U G S A N D T W O S E T SC R E W S 1 8 0 D E G R E E S A P A R T . S T O R Z F A C E T O B E M E T A L , N O G A S K E T T O WE A T H E R . S T O R Z C A P T O H A V E S Y N T H E T I C M O L D E D R U B B E R G A S K E T , AN D S H A L L B E A T T A C H E D T O H Y D R A N T A D A P T E R W I T H 1 / 8 I N C H , C O A T E D , ST A I N L E S S S T E E L , A I R C R A F T C A B L E . 12 . F I R E H Y D R A N T S S H A L L B E P A I N T E D W I T H T W O C O A T S O F P A I N T . PR E S E R V A T I V E P A I N T N U M B E R 4 3 - 6 5 5 S A F E T Y Y E L L O W O R A P P R O V E D EQ U A L . 13 . P U M P E R C O N N E C T I O N T O F A C E R O A D W A Y A S S E M B L Y . 14 . F I R E H Y D R A N T S S H A L L B E I N S T A L L E D P E R C I T Y O F R E N T O N S T A N D A R D DE T A I L F O R F I R E H Y D R A N T S , L A T E S T R E V I S I O N . 15 . A L L W A T E R M A I N S 1 0 I N C H E S A N D S M A L L E R T O M A I N T A I N A M I N I M U M CO V E R O F 3 6 I N C H E S B E L O W F I N I S H G R A D E . A L L W A T E R M A I N 1 2 I N C H E S AN D L A R G E R S H A L L B E A T A M I N I M U M O F 4 8 I N C H E S B E L O W F I N I S H GR A D E . W H E R E U T I L I T Y C O N F L I C T S O C C U R , W A T E R M A I N S A R E T O B E LO W E R E D T O C L E A R . 16 . A L L W A T E R M A I N S 6 I N C H E S A N D L A R G E R I N D I A M E T E R S H A L L B E C L E A N E D WI T H P I P E C L E A N I N G P I G S ” P R I O R T O D I S I N F E C T I O N . T H E “ P O L Y P I G S ” SH A L L B E G I R A R D I N D U S T R I E S A Q U A S W A B - A S O R A P P R O V E D E Q U A L , 2 LB / C U . F T . D E N S I T Y F O A M W I T H 9 0 A D U R O M E T E R U R E T H A N E R U B B E R CO A T I N G O N T H E R E A R O F “ P I G ” O N L Y . 17 . “ P I G S ” S H A L L B E C Y L I N D E R S H A P E D W I T H B U L L E T N O S E O R S Q U A R E E N D . TH E C O N T R A C T O R W I L L P E R F O R M T H E C L E A N I N G O P E R A T I O N . CITY OF RENTON WATER UTILITY NOTES AND SPECIFICATIONS (CONTINUED):18. A L L W A T E R M A I N S A N D S E R V I C E S S H A L L B E P R E S S U R E T E S T E D T O A MINIMUM OF 200 PSI OR 150 PSI OVER OPERATING PRESSURE, IN ACCORDANCE WITH THE SPECIFICATIONS OF THE CITY OF RENTON AND THE WASHINGTON STATE HEALTH DEPARTMENT. ALL PRESSURE TESTING SHALL BE DONE IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY OF RENTON. THE QUANTITY OF WATER LOST FROM THE MAIN SHALL NOT EXCEED THE NUMBER OF GALLONS PER HOUR AS LISTED IN CITY OF RENTON STANDARD PLANS & SPECIFICATIONS 7-11.3(11). THE LOSS IN PRESSURE SHALL NOT EXCEED 5 PSI DURING THE 2 HOUR TEST PERIOD.19. A L L W A T E R M A I N S A N D S E R V I C E S S H A L L B E D I S I N F E C T E D B Y T H E INJECTION OF A 50 PPM (MINIMUM CONCENTRATION) CHLORINE/WATER SOLUTION. DRY CALCIUM HYPOCHLORITE SHALL NOT BE PLACED IN THE PIPE AS LAID. CHLORINE SHALL BE METERED/INJECTED IN ACCORDANCE WITH SECTION 7-11.3(12)E OR 7-11.3(12)F OF THE STANDARD SPECIFICATIONS REFERENCED ABOVE.20. A P R E - C O N S T R U C T I O N C O N F E R E N C E I S R E Q U I R E D P R I O R T O A N Y CONSTRUCTION. A MINIMUM OF FIVE (5) WORKING DAYS NOTICE IS REQUIRED FOR SCHEDULING.21. T W E N T Y - F O U R ( 2 4 ) H O U R S N O T I C E W I L L B E R E Q U I R E D P R I O R T O STARTING NEW CONSTRUCTION.22. I T S H A L L B E T H E C O N T R A C T O R ' S R E S P O N S I B I L I T Y T O S E C U R E A L L NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION.23. I N S T A L L A T I O N O F C O R P O R A T E S T O P S , W A T E R S E R V I C E S , L I N E S A N D METERS SHALL NOT BE DONE UNTIL ALL SERVICE AGREEMENTS, METER APPLICATIONS, CONSTRUCTION PERMITS, AND PAYMENT OF FEES HAVE BEEN MADE TO THE CITY OF RENTON.24. A L L C O N N E C T I O N T O E X I S T I N G M A I N S I S T O B E A C C O M P L I S H E D B Y T H E CITY OF RENTON, EXCEPT WET TAPS, WHICH MAY BE MADE BY APPROVED WET TAP CONTRACTORS WITH PRIOR APPROVAL FROM THE PUBLIC WORKS DEPARTMENT. ALL NECESSARY EXCAVATION AND MATERIALS ARE TO BE SUPPLIED BY THE CONTRACTOR AND BE ON-SITE PRIOR TO CITY NOTIFICATIONS.25. I N S P E C T I O N W I L L B E A C C O M P L I S H E D B Y A R E P R E S E N T A T I V E O F T H E C I T Y OF RENTON. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY DEVELOPMENT SERVICES TWENTY FOUR (24) HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION. THE CONTRACTOR, AS WELL AS THE ENGINEERS, SHALL KEEP AS-BUILT DRAWINGS.26. C O N T R A C T O R T O P R O V I D E P L U G S A N D T E M P O R A R Y B L O W - O F F ASSEMBLIES FOR TESTING AND PURITY ACCEPTANCE PRIOR TO FINAL TIE-IN.27. A L L J O I N T R E S T R A I N T S Y S T E M S ( S H A C K L E R O D S , N U T S , B O L T S , E T C . ) SHALL BE AS MANUFACTURED BY THE STAR MANUFACTURING COMPANY OF COLUMBUS OHIO, OR EQUAL, APPROVED IN WRITING BY THE PUBLIC WORKS DEPARTMENT.28. A S P H A L T A N D C O N C R E T E S T R E E T P A V I N G S H A L L B E S A W C U T T O A MINIMUM DEPTH OF TWO (2) INCHES. OIL MAT STREETS MAY BE SPADE CUT. ALL SURFACE CONCRETE, PAVEMENT, SIDEWALKS, CURB, GUTTERS,AND DRIVEWAY APPROACHES SHALL BE SAWCUT TO A MINIMUM DEPTH OF TWO (2) INCHES OR REMOVED TO AN EXISTING EXPANSION JOINT.29. A T E M P O R A R Y C O L D M I X A S P H A L T P A T C H S H A L L B E P L A C E D O N T H E D A Y OF INITIAL EXCAVATION WITH A PERMANENT, SEALED PATCH TO BE PLACED, TO CITY OF RENTON POLICY, WITHIN 10 DAYS. CALL FOR SUBGRADE INSPECTION PRIOR TO PLACEMENT OF FINAL PATCH. *30. F O R C I T Y P R O J E C T S S U C H A S T E L E M E T R Y C O N D U I T , T H E P V C P I P E U S E D SHALL BE ALL CHEMICAL PROCESS LINES SHALL BE SCHEDULE 80 PVC PIPE. SCHEDULE 40 IN UNIMPROVED AREAS AND SCHEDULE 80 PVC PIPE UNDER IMPROVED AREAS. 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 0 0 0 0 0 0 2 . d w g | L a y o u t : C 0 0 0 0 0 0 2 G E N E R A L N O T E S P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 4 5 : 2 3 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C0000002 D. S a a r e n a s B. I d d i n s E. D a v i d o NONE 0E. Davido 33 7 2 3 AREA SHOWN ON THIS PLAN WWTP KEY PLAN NO SCALE 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 0 1 . d w g | L a y o u t : C 2 2 4 0 1 0 1 D E M O A N D T E S C P L A N A R E A 1 6 P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 4 5 : 4 9 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; 2 2 4 - 1 1 2 3 6 2 6 E x i s t S u r v . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l E x i s t i n g B a s e m a p . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; W W T P K e y P l a n . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l L i m i t s . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l T E S C . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S h e e t N o t e s . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240101 D. S a a r e n a s B. I d d i n s E. D a v i d o 1" = 20'.0E. Davido MA T C H L I N E - S E E D W G C 2 2 4 0 1 0 2 33 7 2 3 M A T C H L I N E - S E E D W G C 2 2 4 0 1 0 5 .KEY NOTES:INSTALL 132 LF PERIMETER PROTECTION (36 THIS SHEET) PER GENERAL NOTE 1 INSTALL 44 LF PERIMETER PROTECTION PER GENERAL NOTE 1 INSTALL 95 LF PERIMETER PROTECTION PER GENERAL NOTE 1 DELINEATE DISTURBANCE LIMITS WITH HIGH-VISIBILITY FENCE IN PERVIOUS AREAS INSTALL CATCH BASIN FILTER12345 1 2 5 3 5 4 3 C2240151 5 C2240151 1 C22401513C22401513C22401515C22401515C2240151 AREA SHOWN ON THIS PLAN WWTP KEY PLAN NO SCALE 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 0 2 . d w g | L a y o u t : C 2 2 4 0 1 0 2 D E M O A N D T E S C P L A N A R E A 1 7 P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 4 6 : 1 9 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; 2 2 4 - 1 1 2 3 6 2 6 E x i s t S u r v . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l E x i s t i n g B a s e m a p . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; W W T P K e y P l a n . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l L i m i t s . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l T E S C . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S h e e t N o t e s . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S i t e I n d e x . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240102 D. S a a r e n a s B. I d d i n s E. D a v i d o 1" = 20'0E. Davido MA T C H L I N E - S E E D W G C 2 2 4 0 1 0 3 33 7 2 3 MA T C H L I N E - S E E D W G C 2 2 4 0 1 0 1 KEY NOTES:INSTALL 335 LF (114 LF THIS SHEET)PERIMETER PROTECTION PER GENERAL NOTE 1 INSTALL CATCH BASIN FILTER INSTALL 132 LF (96 THIS SHEET)PERIMETER PROTECTION PER GENERAL NOTE 1 DELINEATE DISTURBANCE LIMITS WITH HIGH-VISIBILITY FENCE IN PERVIOUS AREAS INSTALL 252 LF PERIMETER PROTECTION PER GENERAL NOTE 11234512 3 2 4 5 3 C22401515 C2240151 1 C2240151 3 C22401515 C2240151 3 C22401515 C2240151 AREA SHOWN ON THIS PLAN WWTP KEY PLAN NO SCALE 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 0 3 . d w g | L a y o u t : C 2 2 4 0 1 0 3 D E M O A N D T E S C P L A N A R E A 1 8 P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 4 6 : 4 4 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; 2 2 4 - 1 1 2 3 6 2 6 E x i s t S u r v . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l E x i s t i n g B a s e m a p . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; W W T P K e y P l a n . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l L i m i t s . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l T E S C . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S h e e t N o t e s . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240103 D. S a a r e n a s B. I d d i n s E. D a v i d o 1" = 20'.0E. Davido 33 7 2 3 MA T C H L I N E - S E E D W G C 2 2 4 0 1 0 2 .KEY NOTES:CONSTRUCTION EQUIPMENT ENTRY/EXIT (FROM SW 7TH ST)INSTALL CATCH BASIN FILTER CONTRACTOR TO SWEEP STREETS DAILY OR MORE FREQUENTLY AS REQUIRED TO REMOVE TRACKED SEDIMENT EX CURB TO BE REMOVED FOR CONSTRUCTION ACCESS INSTALL 335 LF (221 LF THIS SHEET)PERIMETER PROTECTION PER GENERAL NOTE 1 CONSTRUCTION STAGING & STOCKPILING AREA DELINEATE DISTURBANCE LIMITS WITH HIGH-VISIBILITY FENCE IN PERVIOUS AREAS INSTALL 175'L x 25'W STABILIZED CONSTRUCTION ENTRANCE LAY BACK SLOPE FOR CONSTRUCTION ENTRANCE TO BE 3H:1V MAX123456789 1 2 4 3 2 5 6 7 8 3 1 C2240151 4 C22401513C22401515C2240151 AP P R O X 2 0 0 - F T S H O R E L I N E JU R I S D I C T I O N P E R C O R G I S MA P P I N G AP P R O X I M A T E O H W M (N O T S U R V E Y E D ) 9 AREA SHOWN ON THIS PLAN WWTP KEY PLAN NO SCALE 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 0 4 . d w g | L a y o u t : C 2 2 4 0 1 0 4 D E M O A N D T E S C P L A N A R E A 2 1 P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 4 7 : 0 9 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; 2 2 4 - 1 1 2 3 6 2 6 E x i s t S o l i d T u n n e l U p d a t e . d w g ; 2 2 4 - 1 1 2 3 6 2 6 E x i s t S u r v . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l E x i s t i n g B a s e m a p . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; W W T P K e y P l a n . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l T E S C . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l L i m i t s . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S h e e t N o t e s . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240104 D. S a a r e n a s B. I d d i n s E. D a v i d o 1" = 20'0E. Davido MA T C H L I N E - S E E D W G C 2 2 4 0 1 0 5 33 7 2 3 KE Y N O T E S : CO N S T R U C T I O N EQ U I P M E N T E N T R Y / E X I T (F R O M M O N S T E R R D S W ) IN S T A L L C A T C H BA S I N F I L T E R IN S T A L L 1 6 8 L F ( 1 1 L F T H I S SH E E T ) P E R I M E T E R PR O T E C T I O N P E R GE N E R A L N O T E 1 EX C U R B T O B E R E M O V E D FO R C O N S T R U C T I O N AC C E S S IN S T A L L 1 0 0 ' L x 2 5 ' W ST A B I L I Z E D CO N S T R U C T I O N EN T R A N C E CO N S T R U C T I O N S T A G I N G & S T O C K P I L I N G A R E A IN S T A L L 5 1 2 L F ( 3 7 0 L F TH I S S H E E T ) P E R I M E T E R PR O T E C T I O N P E R GE N E R A L N O T E 1 FL A G W E T L A N D PE R I M E T E R W I T H S . A . S . B . TA P E PROTECT EXISTING WETLAND & 50' BUFFER.NO GRADING OR OTHER GROUND DISTURBANCE TO OCCUR WITHIN WETLAND BUFFER DELINEATE DISTURBANCE LIMITS WITH HIGH-VISIBILITY FENCE IN PERVIOUS AREAS INSTALL CATCH BASIN FILTER IN ALL DRAINAGE STRUCTURES IN VICINITY CONTRACTOR TO SWEEP STREETS DAILY OR MORE FREQUENTLY AS REQUIRED TO REMOVE TRACKED SEDIMENT 3 2 5 6 7 8 9 12 10 2 12 2 1 2 4 11 1 C2 2 4 0 1 5 1 4 C2 2 4 0 1 5 1 3 C2 2 4 0 1 5 1 5 C2240151 3 C2 2 4 0 1 5 1 5 C22401511C2240151 AREA SHOWN ON THIS PLAN WWTP KEY PLAN NO SCALE 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 0 5 . d w g | L a y o u t : C 2 2 4 0 1 0 5 D E M O A N D T E S C P L A N A R E A 2 2 P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 4 7 : 3 3 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; 2 2 4 - 1 1 2 3 6 2 6 E x i s t S u r v . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l E x i s t i n g B a s e m a p . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; W W T P K e y P l a n . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l T E S C . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l L i m i t s . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S h e e t N o t e s . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240105 D. S a a r e n a s B. I d d i n s E. D a v i d o 1" = 20'0E. Davido MA T C H L I N E - S E E D W G C 2 2 4 0 1 0 4 33 7 2 3 MATCH LINE - SEE DWG C2240101 KE Y N O T E S : CO N T R A C T O R T O S W E E P S T R E E T S DA I L Y O R M O R E F R E Q U E N T L Y A S RE Q U I R E D T O R E M O V E T R A C K E D SE D I M E N T IN S T A L L C A T C H B A S I N F I L T E R I N A L L DR A I N A G E S T R U C T U R E S I N V I C I N I T Y IN S T A L L C A T C H B A S I N F I L T E R RE P L D E C O R A T I V E C O N C B A N D IN - K I N D DE L I N E A T E D I S T U R B A N C E L I M I T S WI T H H I G H - V I S I B I L I T Y F E N C E I N PE R V I O U S A R E A S IN S T A L L 5 1 2 L F ( 3 7 0 L F T H I S S H E E T ) PE R I M E T E R P R O T E C T I O N P E R GE N E R A L N O T E 1 IN S T A L L 1 6 8 L F ( 1 5 7 L F T H I S S H E E T ) PE R I M E T E R P R O T E C T I O N P E R GE N E R A L N O T E 1 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 C2240151 3 C22401515 C2240151 3 C22401515 C22401511C2240151 AREA SHOWN ON THIS PLAN WWTP KEY PLAN NO SCALE 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 1 1 . d w g | L a y o u t : C 2 2 4 0 1 1 1 P A V I N G A N D G R A D I N G P L A N A R E A 1 6 P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 4 8 : 0 4 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; 2 2 4 - 1 1 2 3 6 2 6 E x i s t S u r v . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l E x i s t i n g B a s e m a p . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; W W T P K e y P l a n . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S i t e P l a n _ C 3 D . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l L i m i t s . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l W i p e o u t . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S h e e t N o t e s . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240111 D. S a a r e n a s B. I d d i n s E. D a v i d o 1" = 20'0E. Davido MA T C H L I N E - S E E D W G C 2 2 4 0 1 1 2 33 7 2 3 M A T C H L I N E - S E E D W G C 2 2 4 0 1 1 5 C C 2 2 4 0 1 5 2 KEY NOTES:EX CONTOUR (TYP)PROPOSED CONTOUR (TYP)HIGH-VISIBILITY FENCING DELINEATING CONSTRUCTION LIMITS123 2 1 3 AREA SHOWN ON THIS PLAN WWTP KEY PLAN NO SCALE 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 1 2 . d w g | L a y o u t : C 2 2 4 0 1 1 2 P A V I N G A N D G R A D I N G P L A N A R E A 1 7 P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 4 8 : 3 7 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; 2 2 4 - 1 1 2 3 6 2 6 E x i s t S u r v . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l E x i s t i n g B a s e m a p . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; W W T P K e y P l a n . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S i t e P l a n _ C 3 D . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l L i m i t s . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l W i p e o u t . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S h e e t N o t e s . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240112 D. S a a r e n a s B. I d d i n s E. D a v i d o 1" = 20'0E. Davido MA T C H L I N E - S E E D W G C 2 2 4 0 1 1 3 33 7 2 3 MA T C H L I N E - S E E D W G C 2 2 4 0 1 1 1 C C 2 2 4 0 1 5 2 E C2240152DC2240152KEY NOTES:EX CONTOUR (TYP)PROPOSED CONTOUR (TYP)HIGH-VISIBILITY FENCING DELINEATING CONSTRUCTION LIMITS123 3 1 2 AREA SHOWN ON THIS PLAN WWTP KEY PLAN NO SCALE 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 1 3 . d w g | L a y o u t : C 2 2 4 0 1 1 3 P A V I N G A N D G R A D I N G P L A N A R E A 1 8 P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 4 9 : 1 0 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; 2 2 4 - 1 1 2 3 6 2 6 E x i s t S u r v . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l E x i s t i n g B a s e m a p . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; W W T P K e y P l a n . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S i t e P l a n _ C 3 D . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l L i m i t s . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l W i p e o u t . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S h e e t N o t e s . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240113 D. S a a r e n a s B. I d d i n s E. D a v i d o 1" = 20'0E. Davido 33 7 2 3 MA T C H L I N E - S E E D W G C 2 2 4 0 1 1 2 B C 2 2 4 0 1 5 2 KEY NOTES:EX CONTOUR (TYP)PROPOSED CONTOUR (TYP)HIGH-VISIBILITY FENCING DELINEATING CONSTRUCTION LIMITS123 1 2 3 AREA SHOWN ON THIS PLAN WWTP KEY PLAN NO SCALE 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 1 4 . d w g | L a y o u t : C 2 2 4 0 1 1 4 P A V I N G A N D G R A D I N G P L A N A R E A 2 1 P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 4 9 : 4 3 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; 2 2 4 - 1 1 2 3 6 2 6 E x i s t S u r v . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l E x i s t i n g B a s e m a p . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S i t e P l a n _ C 3 D . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; W W T P K e y P l a n . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l L i m i t s . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l W i p e o u t . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S h e e t N o t e s . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240114 D. S a a r e n a s B. I d d i n s E. D a v i d o 1" = 20'0E. Davido MA T C H L I N E - S E E D W G C 2 2 4 0 1 1 5 33 7 2 3 A C2 2 4 0 1 5 2 B C 2 2 4 0 1 5 2 KEY NOTES:EX CONTOUR (TYP)PROPOSED CONTOUR (TYP)CONSTRUCTION LIMITS INSTALL CEMENT CONCRETE TRAFFIC CURB & GUTTER THERMAL OXIDIZER SAWCUT AND MATCH EG SHELTER FOR CONTROL PANEL REPLACE EX ADA RAMP WITH DIRECTIONAL ADA RAMP 2'x5' DETECTABLE WARNING STRIP12345678 9 6 7 4 1 3 5 9 4 C2240153 3 8 AREA SHOWN ON THIS PLAN WWTP KEY PLAN NO SCALE 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 1 5 . d w g | L a y o u t : C 2 2 4 0 1 1 5 P A V I N G A N D G R A D I N G P L A N A R E A 2 2 P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 5 0 : 2 5 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; 2 2 4 - 1 1 2 3 6 2 6 E x i s t S u r v . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l E x i s t i n g B a s e m a p . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S i t e P l a n _ C 3 D . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; W W T P K e y P l a n . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l P i p e _ C 3 D . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l L i m i t s . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l W i p e o u t . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S h e e t N o t e s . d w g ; 2 2 I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240115 D. S a a r e n a s B. I d d i n s E. D a v i d o 1" = 20'0E. Davido MA T C H L I N E - S E E D W G C 2 2 4 0 1 1 4 HE R B FF 1 2 6 . 0 0 33 7 2 3 MATCH LINE - SEE DWG C2240111 1 KEY NOTES:CONSTRUCTION LIMITS SAWCUT & MATCH EG INSTALL CONCRETE WALKWAY INSTALL ASPHALT WALKWAY INSTALL CEMENT CONCRETE TRAFFIC CURB & GUTTER (TYP)NEW ASPHALT ROADWAY NEW ASPHALT PARKING123456 7 2 2 3 4 5 2 5 3 C2240153 4 C22401532C2240153 6 7 1 C2240153 1 C2240153 AREA SHOWN ON THIS PLAN WWTP KEY PLAN NO SCALE 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 2 1 . d w g | L a y o u t : C 2 2 4 0 1 2 1 C H A N N E L I Z A T I O N P L A N A R E A 2 1 P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 5 0 : 4 7 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; 2 2 4 - 1 1 2 3 6 2 6 E x i s t S u r v . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l E x i s t i n g B a s e m a p . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S i t e P l a n _ C 3 D . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l P i p e _ C 3 D . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; W W T P K e y P l a n . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l L i m i t s . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240121 D. S a a r e n a s B. I d d i n s E. D a v i d o 1" = 20'0E. Davido MA T C H L I N E - S E E D W G C 2 2 4 0 1 2 2 33 7 2 3 KEY NOTES:PAINT CURB FACE AND TOP BRIGHT RED 18" BRIGHT RED PAINT STRIPE ON PAVEMENT. PAINT STRIPE TO SPAN ENTIRE WIDTH OF ROADWAY12 1 2 AREA SHOWN ON THIS PLAN WWTP KEY PLAN NO SCALE 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 2 2 . d w g | L a y o u t : C 2 2 4 0 1 2 2 C H A N N E L I Z A T I O N P L A N A R E A 2 2 P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 5 1 : 1 3 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; 2 2 4 - 1 1 2 3 6 2 6 E x i s t S u r v . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l E x i s t i n g B a s e m a p . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S i t e P l a n _ C 3 D . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l P i p e _ C 3 D . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; W W T P K e y P l a n . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l L i m i t s . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l W i p e o u t . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240122 D. S a a r e n a s B. I d d i n s E. D a v i d o 1" = 20'0E. Davido 33 7 2 3 MA T C H L I N E - S E E D W G C 2 2 4 0 1 2 1 1 2 3 4 5 8 7 6 KEY NOTES:ADA VAN PARKING STALL SIGN R7-8 OVER R7-8P OR APPROVED EQUAL 4" PARKING STRIPE (TYP)WHEEL STOPS TO BE LOCATED 2' FROM FACE OF WALK PAINT VERTICAL CURB FACE AND 4" OF WALKWAY BRIGHT RED 20' WIDTH FROM FACE OF BOLLARD TO FACE OF CURB 18" BRIGHT RED PAINT STRIPE ON PAVEMENT. PAINT STRIPE TO SPAN ENTIRE WIDTH OF ROADWAY INSIDE RADIUS OF 20' FIRE LANE BOLLARDS ALONG WALKWAY AT 5' O.C. ARE PERMANENT UNLESS OTHERWISE NOTED BOLLARDS FRONTING H2S REMOVAL VESSELS AND POLISHING VESSELS SHALL BE REMOVABLE TYPE AND SPACED AT 5' O.C.2 3 4 9 9 AREA SHOWN ON THIS PLAN WWTP KEY PLAN NO SCALE 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 3 1 . d w g | L a y o u t : C 2 2 4 0 1 3 1 U T I L I T Y P L A N A R E A 2 1 P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 5 1 : 4 8 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; 2 2 4 - 1 1 2 3 6 2 6 E x i s t S u r v . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l E x i s t i n g B a s e m a p . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S i t e P l a n _ C 3 D . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l P i p e _ C 3 D . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; W W T P K e y P l a n . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l W i p e o u t . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S h e e t N o t e s . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240131 D. S a a r e n a s B. I d d i n s E. D a v i d o 1" = 20'0E. Davido MA T C H L I N E - S E E D W G C 2 2 4 0 1 3 2 A. 1 C2 2 4 0 1 6 0 33 7 2 3 1 KE Y N O T E S : TH E R M A L O X I D I Z E R P A D RE L O C A T E U T I L I T Y V A U L T RE L O C A T E D I R R I G A T I O N B O X , W A T E R ME T E R A N D H O S E B I B CO N N E C T T O E X I S T I N G 2 4 " L S G FL A N G E A T I N V E R T E L E V A T I O N 1 2 0 . 2 . RE F E R T O M E C H A N I C A L D E T A I L X X X FO R A D D I T I O N A L R E Q U I R E M E N T S . RE M O V E 1 0 " L S G P I P I N G T O E X I S T I N G BO I L E R . C O O R D I N A T E W O R K W I T H SE Q U E N C I N G C O N S T R A I N T S . CO N N E C T T O E X I S T I N G 3 " H P N G A N D 2" H S S G A T I N V E R T E L E V A T I O N 1 2 3 . 0 . CO O R D I N A T E W O R K W I T H SE Q U E N C I N G C O N S T R A I N T S . CO N N E C T T O E X I S T I N G 3 0 " L S G FL A N G E A T I N V E R T E L E V A T I O N 1 2 0 . 5 . RE F E R T O M E C H A N I C A L D E T A I L X X X FO R A D D I T I O N A L R E Q U I R E M E N T S . CO O R D I N A T E W O R K W I T H SE Q U E N C I N G C O N S T R A I N T S . CO N N E C T T O E X I S T I N G 1 " I A A T IN V E R T E L E V A T I O N 1 2 0 . 0 . RE F E R T O M 2 2 2 3 1 0 1 F O R A B O V E GR A D E P I P I N G I N T H I S A R E A . 1 2 3 4 5 6 7 8 2 3 7 8 5 C C2 2 4 0 1 6 1 6 4 6 AREA SHOWN ON THIS PLAN WWTP KEY PLAN NO SCALE C2240132 D. S a a r e n a s B. I d d i n s E. D a v i d o 1" = 20'0E. Davido MA T C H L I N E - S E E D W G C 2 2 4 0 1 3 1 (W A S T E ) A. 2 C2 2 4 0 1 6 0 C C2 2 4 0 1 6 1 B C2 2 4 0 1 6 1 33 7 2 3 D C2 2 4 0 1 5 7 KE Y N O T E S : 6" T A P P I N G T E E O N E X 1 2 " M A I N W/ C O N C T H R U S T B L O C K I N G 6" 1 1 . 2 5 ° ( M J ) H O R I Z O N T A L B E N D W/ C O N C T H R U S T B L O C K I N G IN S T A L L 6 " D O U B L E D E T E C T O R C H E C K A S S E M B L Y (D D C A ) FI R E D E P A R T M E N T D O U B L E C O N N E C T I O N ( F D D C ) P E R DD C A S C H E M A T I C IN D I C A T O R P O S T V A L V E ( I P V ) P E R D D C A S C H E M A T I C 1- 1 / 2 " T A P P I N G T E E O N E X 1 2 " M A I N W/ C O N C T H R U S T B L O C K I N G BU I L D I N G T O B E E Q U I P P E D W / N F P A 1 3 A N D 8 2 0 SP R I N K L E R S Y S T E M PR O T E C T E X C I T Y W M T H R O U G H O U T C O N S T R U C T I O N . CO N N E C T I O N S T O C I T Y W M A R E N O T P E R M I T T E D . RE L O C A T E I R R I G A T I O N B O X RE L O C A T E W A T E R M E T E R 6" I N S I D E D R O P C O N N E C T I O N T O E X S M H AL L P O R T I O N S O F H E R B A R E W I T H I N 1 5 0 ' O F F I R E TR U C K A C C E S S . S E E A R E A 2 2 C H A N N E L I Z A T I O N P L A N FO R F I R E A C C E S S L O C A T I O N S CO N N E C T T O E X I S T I N G 2 " H S S G A T I N V E R T EL E V A T I O N 1 2 3 . 0 0 . 1 2 3 4 5 6 7 8 9 10 11 12 13 1 23 4 5 6 8 9 9 10 A C2 2 4 0 1 5 7 B C2 2 4 0 1 5 7 11 7 12 13 14 16 KEY NOTES (CONTINUED):CONNECT TO EXISTING 3" HPNG AT INVERT ELEVATION 123.00.REMOVE EXISTING 2" HSSG LINE BACK TO CONNECTION IN NORTH ROADWAY. COORDINATE WORK WITH SEQUENCING CONSTRAINTS.BOLLARDS WITHIN CLOUD ARE TO BE REMOVABLE .6" SS @ 2.00% MIN SLOPE 6" SSCO RIM 126.41 6" IE 118.90 6" SSCO RIM 126.40 6" IE 119.26 6" SSCO RIM 125.54 6" IE 120.4014151617181920 16 17 3 C2240158 18 2 C2240158 17 17 19 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 3 2 . d w g | L a y o u t : C 2 2 4 0 1 3 2 U T I L I T Y P L A N A R E A 2 2 P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 5 2 : 2 4 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; 2 2 4 - 1 1 2 3 6 2 6 E x i s t S u r v . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l E x i s t i n g B a s e m a p . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S i t e P l a n _ C 3 D . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l P i p e _ C 3 D . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; W W T P K e y P l a n . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l W i p e o u t . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S h e e t N o t e s . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 20 15 4 C2240159 5 C2240159 6 C2240159 1 C22401582C22401582C2240158 AREA SHOWN ON THIS PLAN WWTP KEY PLAN NO SCALE 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 4 1 . d w g | L a y o u t : C 2 2 4 0 1 4 1 S T O R M W A T E R M A N A G E M E N T P L A N A R E A 2 1 P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 5 2 : 5 8 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; 2 2 4 - 1 1 2 3 6 2 6 E x i s t S u r v . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l E x i s t i n g B a s e m a p . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S i t e P l a n _ C 3 D . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l P i p e _ C 3 D . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; W W T P K e y P l a n . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l L i m i t s . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l W i p e o u t . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S h e e t N o t e s . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240141 D. S a a r e n a s B. I d d i n s E. D a v i d o 1" = 20'0E. Davido MA T C H L I N E - S E E D W G C 2 2 4 0 1 4 2 33 7 2 3 4 KEY NOTES:DRAINAGE FROM THERMAL OXIDIZER PAD TO BE COLLECTED IN EX STORM SYSTEM IN ROAD (2,437 SF).SEE AREA 21 PAVING & GRADING PLAN FOR THERMAL OXIDIZER PAD GRADING AREA OF EX ROADWAY TO DRAIN TO PROPOSED STORMWATER FACILITIES. 2,935 SF TOTAL (1,490 SF THIS SHEET). SEE AREA 21 PAVING & GRADING PLAN FOR ROADWAY GRADING CATCH BASIN - TYPE 1 W/ VANED GRATE W/ 90° DOWNTURNED ELBOW RIM 124.51 8" IE (S) 120.62 8" IE (E) 120.62 2' MIN SUMP 51 LF 8" SD @ 1.00%(5 LF THIS SHEET)118 LF 8" SD @ 1.00%CATCH BASIN - TYPE 1 W/ VANED GRATE W/ 90° DOWNTURNED ELBOW RIM 124.43 8" IE (SE) 121.81 8" IE (N) 121.81 2' MIN SUMP 61 LF 8" SD @ 1.00%(8 LF THIS SHEET) 2 5 7 6 3 1 C22401552C22401552C22401553 C2240155 4 C22401551C22401553C22401554C2240155 B C 2 2 4 0 1 5 4 A C 2 2 4 0 1 5 4 2 C2240155 1 4 C22401553C2240155 AREA SHOWN ON THIS PLAN WWTP KEY PLAN NO SCALE 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 4 2 . d w g | L a y o u t : C 2 2 4 0 1 4 2 S T O R M W A T E R M A N A G E M E N T P L A N A R E A 2 2 P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 5 3 : 3 2 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; 2 2 4 - 1 1 2 3 6 2 6 E x i s t S u r v . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l E x i s t i n g B a s e m a p . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S i t e P l a n _ C 3 D . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l P i p e _ C 3 D . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; W W T P K e y P l a n . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l L i m i t s . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S h e e t N o t e s . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l W i p e o u t . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240142 D. S a a r e n a s B. I d d i n s E. D a v i d o 1" = 20'0E. Davido MA T C H L I N E - S E E D W G C 2 2 4 0 1 4 1 33 7 2 3 KE Y N O T E S : ST O R M W A T E R D E T E N T I O N S Y S T E M W/ F L O W R E S T R I C T O R T E E VA U L T : 1 4 ' W x 7 0 ' L x 1 0 ' D ( I N T E R I O R D I M E N S I O N S ) TO P E L E V 1 2 2 . 5 2 ( I N S I D E O F V A U L T ) BO T T O M E L E V 1 1 2 . 5 2 ( I N S I D E O F V A U L T ) 6" I E ( E ) 1 2 1 . 0 6 ( I N L E T ) 8" I E ( W ) 1 1 9 . 6 1 ( I N L E T ) 8" I E ( N ) 1 1 3 . 0 2 ( O U T L E T ) FL O W R E S T R I C T O R T E E ( L O C A T E D A B O V E SU M P ) : 12 " O V E R F L O W E L E V : 1 2 2 . 0 2 OR I F I C E # 1 : 0 . 6 8 " Ø EL E V : 1 0 9 . 0 2 OR I F I C E # 2 : 1 . 4 7 " Ø EL E V : 1 2 0 . 9 2 OR I F I C E # 3 : 0 . 9 1 " Ø EL E V : 1 2 1 . 6 7 4' x 4 ' x 4 ' V A U L T S U M P L O C A T E D B E N E A T H F L O W RE S T R I C T O R T E E AR E A O F E X R O A D W A Y T O D R A I N T O P R O P O S E D ST O R M W A T E R F A C I L I T I E S . 2, 9 3 5 S F T O T A L ( 1 , 4 4 5 S F T H I S S H E E T ) . SE E A R E A 2 2 P A V I N G & G R A D I N G P L A N F O R RO A D W A Y G R A D I N G RO O F D O W N S P O U T S P E R AR C H I T E C T U R A L P L A N S PE R I M E T E R F O O T I N G D R A I N : 4 " P V C I N 6 " WA S H E D R O C K W R A P P E D I N N O N - W O V E N GE O T E X T I L E F A B R I C 8" W Y E C O N N E C T I O N I N T O E X 1 8 " S T O R M M A I N 8" I E 1 1 2 . 5 8 EX 1 8 " I E 1 1 1 . 3 3 35 L F 4 ' S O L I D W A L L P V C F O O T I N G D R A I N TI G H T L I N E A T 2 . 0 0 % M I N S L O P E CA T C H B A S I N - T Y P E 1 W/ V A N E D G R A T E W/ 9 0 ° D O W N T U R N E D E L B O W RI M 1 2 4 . 8 6 8" I E ( N E ) 1 2 2 . 0 0 2' M I N S U M P 4' x 6' STORMWATER BIOFILTRATION SYSTEM (MWS-L-4-6.33-G-UG)W/ SOLID LID RIM 125.40 8" IE (N) 120.11 8" IE (W) 120.11 8" IE (E) 119.61 6" SDCO RIM 125.94 6" IE 123.40 2' Ø MANHOLE LID ACCESS TO DETENTION FACILITY W/ INTERNAL LADDER. RIM FLUSH WITH FG (TYP)25 LF 8" SD @ 2.00%5 LF 8" SD @ 2.00%51 LF 8" SD @ 1.00%(46 LF THIS SHEET)61 LF 8" SD @ 1.00%(53 LF THIS SHEET)CATCH BASIN - TYPE 1 W/ VANED GRATE W/ 90° DOWNTURNED ELBOW RIM 125.10 8" IE (NE) 122.42 2' MIN SUMP 117 LF 6" SD @ 2.00%6 LF 8" SD @ 33.33% MIN 10' MINIMUM VEGETATED FLOWPATH FOR BASIC DISPERSION. ARROW INDICATES DIRECTION OF FLOW.ROOF OVERHANG PER ARCHITECTURAL PLANS 2 13 4 5 6 7 8 9 10 17 11 12 13 14 15 16 18 20 1 C22401551C22401566C22401555C22401552C22401552C22401552C22401552C22401553C22401551C22401554C22401552C22401552C2240155 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 5 1 . d w g | L a y o u t : C 2 2 4 0 1 5 1 D E M O A N D T E S C D E T A I L S P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 5 4 : 1 0 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g I M A G E S : 2 1 3 . 3 _ C O R P W _ P l a s t i c C o v e r i n g . t i f ; 2 1 3 . 4 _ C O R P W _ S t r a w W a t t l e s . t i f ; 2 1 4 . 0 _ C O R P W _ S i l t F e n c e . t i f ; 2 1 5 . 1 _ C O R P W _ S t a b i l i z e d C o n s t r u c t i o n E n t r a n c e . t i f ; 2 1 6 . 3 _ C O R P W _ C a t c h B a s i n F i l t e r . t i f ; SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240151 D. S a a r e n a s B. I d d i n s E. D a v i d o NONE 0E. Davido 33 7 2 3 SC A L E : SC A L E : SC A L E : SC A L E : SCALE: NT S CA T C H B A S I N F I L T E R C2 2 4 0 1 0 1 - C 2 2 4 0 1 0 5 1 NT S PL A S T I C C O V E R I N G C2 2 4 0 1 0 1 - C 2 2 4 0 1 0 5 2 NT S SI L T F E N C E C2 2 4 0 1 0 1 - C 2 2 4 0 1 0 5 3 NTSSTABILIZED CONSTRUCTION ENTRANCE C2240101-C22401054 NT S ST R A W W A T T L E S C2 2 4 0 1 0 1 - C 2 2 4 0 1 0 5 5 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 5 2 . d w g | L a y o u t : C 2 2 4 0 1 5 2 P A V I N G A N D G R A D I N G P R O F I L E S P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 5 4 : 3 2 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S i t e P l a n _ C 3 D . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240152 D. S a a r e n a s B. I d d i n s E. D a v i d o NTS 0E. Davido 33 7 2 3 SC A L E : SC A L E : SC A L E : SC A L E : SC A L E : SC A L E : MATCH LINE MATCH LINE H. 1 " = 2 0 ' ; V . 1 " = 1 0 ' EX I S T I N G S P O I L S R E G R A D I N G ( N O R T H - S O U T H ) C2 2 4 0 1 1 4 - C 2 2 4 0 1 1 5 A H. 1 " = 2 0 ' ; V . 1 " = 1 0 ' EX I S T I N G S P O I L S R E G R A D I N G ( E A S T - W E S T ) C2240114B H. 1 " = 2 0 ' ; V . 1 " = 1 0 ' PR O P O S E D S P O I L S P I L E G R A D I N G ( E A S T - W E S T ) C2 2 4 0 1 1 1 - C 2 2 4 0 1 1 3 C H. 1 " = 2 0 ' ; V . 1 " = 1 0 ' PR O P O S E D S P O I L S P I L E G R A D I N G ( E A S T - W E S T ) C2 2 4 0 1 1 1 - C 2 2 4 0 1 1 3 C H. 1 " = 2 0 ' ; V . 1 " = 1 0 ' PR O P O S E D S P O I L S P I L E G R A D I N G ( N O R T H - S O U T H ) C2 2 4 0 1 1 2 D H. 1 " = 2 0 ' ; V . 1 " = 1 0 ' PR O P O S E D S P O I L S P I L E G R A D I N G ( N O R T H - S O U T H ) C2240112E SC A L E : AS P H A L T R O A D W A Y A N D PA R K I N G P A V E M E N T NT S DE T A I L C2 2 4 0 1 1 4 - C 2 2 4 0 1 1 5 1 SC A L E : AS P H A L T W A L K P A V E M E N T NT S DE T A I L C2 2 4 0 1 1 5 2 3" H M A ( C L 1 / 2 ) 6" C S B C CO M P A C T E D SU B G R A D E 3" H M A ( C L 1 / 2 ) 4" C S B C SC A L E : CE M E N T C O N C R E T E T R A F F I C C U R B A N D G U T T E R NT S DE T A I L C2 2 4 0 1 1 4 - C 2 2 4 0 1 1 5 4 SC A L E : AS P H A L T R O A D W A Y NT S SE C T I O N C2240114-C2240115A 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 5 3 . d w g | L a y o u t : C 2 2 4 0 1 5 3 P A V I N G A N D G R A D I N G D E T A I L S P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 5 4 : 5 0 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g I M A G E S : C E M E N T C O N C R E T E C U R B S . t i f ; SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240153 D. S a a r e n a s B. I d d i n s E. D a v i d o NO SCALE 0E. Davido 33 7 2 3 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 5 4 . d w g | L a y o u t : C 2 2 4 0 1 5 4 S T O R M W A T E R M A N A G E M E N T P R O F I L E S P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 5 5 : 0 9 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S i t e P l a n _ C 3 D . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240154 D. S a a r e n a s B. I d d i n s E. D a v i d o AS NOTED 0E. Davido 33 7 2 3 SC A L E : H. 1 " = 1 0 ' ; V . 1 " = 5 ' PR O F I L E A C2 2 4 0 1 4 1 - C 2 2 4 0 1 4 2 NOTES:CONTRACTOR TO POTHOLE EXISTING CROSSING UTILITIES PRIOR TO ONSITE WORK SC A L E : H. 1 " = 1 0 ' ; V . 1 " = 5 ' PR O F I L E B C2 2 4 0 1 4 1 - C 2 2 4 0 1 4 2 EG FG 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 5 5 . d w g | L a y o u t : C 2 2 4 0 1 5 5 S T O R M W A T E R M A N A G E M E N T D E T A I L S P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 5 5 : 2 0 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g I M A G E S : 2 0 0 _ C a t c h B a s i n T y p e 1 . t i f ; 2 0 4 . 0 _ R e c t a n g u l a r F r a m e . t i f ; 2 0 4 . 2 _ R e c t a n g u l a r V a n e d G r a t e . t i f ; 2 0 4 . 5 _ S t o r m R o u n d F r a m e a n d C o v e r . t i f ; 2 2 0 _ P i p e C o m p a c t i o n D e s i g n a n d B a c k f i l l . t i f ; 2 2 6 _ S t o r m w a t e r F a c i l i t y C l e a n o u t . t i f ; M W S - L - 4 - 6 . 3 3 - G - U G _ S t a n d a r d 1 1 0 3 2 0 1 7 . t i f ; SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240155 D. S a a r e n a s B. I d d i n s E. D a v i d o NONE 0E. Davido 33 7 2 3 SC A L E : SC A L E : SC A L E : SCALE: SC A L E : SC A L E : NT S CA T C H B A S I N T Y P E 1 C2 2 4 0 1 4 1 - C 2 2 4 0 1 4 2 1 NT S PI P E C O M P A C T I O N D E S I G N A N D B A C K F I L L 2 NT S RE C T A N G U L A R F R A M E 3 NTSRECTANGULAR VANED GRATE 4 NT S ST O R M W A T E R F A C I L I T Y C L E A N O U T 5 NT S MW S - L - 4 - 6 . 3 3 - G - U G S T O R M W A T E R B I O F I L T R A T I O N S Y S T E M 6 SCALE:NTSSTORM ROUND FRAME AND COVER 7 C2 2 4 0 1 4 1 - C 2 2 4 0 1 4 2 C2 2 4 0 1 4 1 - C 2 2 4 0 1 4 2 C2240141-C2240142 C2240142 C2 2 4 0 1 4 2 C2 2 4 0 1 4 2 GA S K E T I N S T A L L A T I O N D E T A I L SE C T I O N V I E W WA L L C O N N E C T I O N D E T A I L PL A N V I E W WELDED ELBOW WITH ORIFICE DRILLED IN END PLATE6" MIN.6"MAX.STANDPIPE ELBOW DETAIL ROUND SOLID COVER MARKED "STORM"WITH LOCKING BOLTS,UNLESS OTHERWISE APPROVED BY ENGINEER 220# CAPACITY ROD SHEAR GATE (SEE DD/C16)2'- 0" PI P E S U P P O R T ( S ) : 3" x . 0 9 0 G A G E BO L T E D O R I M B E D D E D 2" I N W A L L A T M A X . 3" S P A C I N G , M I N . ON E S U P P O R T MULTI-ORIFICE ELBOW (CC/C16)ORIFICE #2: OU T L E T P I P E 8" I N V E R T E L E V : 1 1 3 . 0 2 RE S T R I C T O R P L A T E WI T H O R I F I C E OR I F I C E # 1 : 6 " M I N . 2 0 " M A X . 6" 1' - 0 " MI N 1 ' - 0 " M I N 2 ' - 6 " M I N . NOTES:1. PIPE SIZES AND SLOPES: PER PLANS 2. FRAME & LADDER OF STEPS OFF SET SO A. CLEANOUT GATE IS VISIBLE FROM TOP B. CLIMB-DOWN SPACE IS CLEAR OF RISER AND CLEANOUT GATE C. FRAME IS CLEAR OF CURB 3. MULTI-ORIFICE ELBOWS MAY BE LOCATED AS SHOWN OR ENTIRELY ON ONE SIDE OF RISER ASSURING ADEQUATE LADDER ACCESSDIA: 1.47"4. INSTALLATION TO MEET WSDOT STANDARDS FOR TYPE II INSTALLATION. 2 ' M I N . 30 ° MI N . MIN.2'- 0"MIN. DI A : 0 . 6 8 " EL E V : 1 0 9 . 0 2 ELEV: 120.92MULTI-ORIFICE ELBOW (CC/C16)ORIFICE #3:DIA: 0.94"ELEV: 121.67OVERFLOWELEV: 122.02 6" DEAD STORAGE 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 5 6 . d w g | L a y o u t : C 2 2 4 0 1 5 6 S T O R M W A T E R M A N A G E M E N T D E T A I L S P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 5 5 : 3 1 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240156 D. S a a r e n a s B. I d d i n s E. D a v i d o NTS 0E. Davido 33 7 2 3 SC A L E : NT S DE T E N T I O N V A U L T 1 VAULT INLET/OUTLET TABLE # S I Z E I N L E T / O U T L E T E L E V A T I O N W A L L L O C A T I O N 16"INLET 121.06 E A S T 2 . 7 5 ' N O F S E C O R N E R 28"INLET 119.61 W E S T 3 ' N O F S W C O R N E R 3 8" O U T L E T 1 1 3 . 0 2 N O R T H 2 . 7 5 ' N O F N W C O R N E R SCALE:NTSACCESS LADDER 2 SC A L E : NTS MU L T I - O R I F I C E F L O W R E S T R I C T O R T E E C22401563C2240156 C2 2 4 0 1 4 2 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 5 7 . d w g | L a y o u t : C 2 2 4 0 1 5 7 S E W E R A N D W A T E R C O N N E C T I O N P R O F I L E S P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 5 5 : 5 0 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l S i t e P l a n _ C 3 D . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240157 D. S a a r e n a s B. I d d i n s E. D a v i d o AS NOTED 0E. Davido 33 7 2 3 SC A L E : H. 1 " = 2 0 ' ; V . 1 " = 1 0 ' 6" S A N I T A R Y S E W E R P R O F I L E C2 2 4 0 1 3 2 D SC A L E : H. 1 " = 1 0 ' ; V . 1 " = 5 ' 6" F I R E S P R I N K L E R S E R V I C E C2 2 4 0 1 3 2 A SC A L E : H.1"=10'; V.1" =5' 1- 1 / 2 " W A T E R S E R V I C E C2240132BNOTES:CONTRACTOR TO POTHOLE EXISTING CROSSING UTILITIES PRIOR TO ONSITE WORK 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 5 8 . d w g | L a y o u t : C 2 2 4 0 1 5 8 S E W E R A N D W A T E R C O N N E C T I O N D E T A I L S P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 5 6 : 0 0 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g I M A G E S : 4 0 2 . 2 _ I n s i d e D r o p C o n n e c t i o n . t i f ; 4 0 3 . 1 _ 8 i n C l e a n o u t . t i f ; 4 0 5 _ S e w e r P i p e B e d d i n g . t i f ; SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240158 D. S a a r e n a s B. I d d i n s E. D a v i d o NONE 0E. Davido 33 7 2 3 SC A L E : NT S IN S I D E D R O P C O N N E C T I O N F O R S A N I T A R Y M A N H O L E C2 2 4 0 1 3 2 1 SC A L E : NT S 6" C L E A N O U T F O R S E W E R C2 2 4 0 1 3 2 2 SC A L E : NT S PI P E B E D D I N G F O R S E W E R C2 2 4 0 1 3 2 3 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 5 9 . d w g | L a y o u t : C 2 2 4 0 1 5 9 S E W E R A N D W A T E R C O N N E C T I O N D E T A I L S P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 5 6 : 1 0 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g I M A G E S : 3 0 0 . 1 _ C o n n e c t i o n t o W a t e r M a i n w i t h T a p p i n g T e e & V a l v e . t i f ; 3 3 0 . 2 _ C o n c r e t e T h r u s t B l o c k i n g . t i f ; 3 6 0 . 2 _ 8 i n D D C A w i t h S t a n d p i p e O u t s i d e I n s t a l l a t i o n . t i f ; SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240159 D. S a a r e n a s B. I d d i n s E. D a v i d o NONE 0E. Davido 33 7 2 3 SC A L E : NT S CO N N E C T I O N T O W A T E R M A I N W I T H T A P P I N G T E E & V A L V E C2 2 4 0 1 3 2 1 SC A L E : NT S AN D D O W N W A R D V E R T I C A L B E N D S C2 2 4 0 1 3 2 2 SC A L E : NT S 6" D D C A W I T H S T A N D P I P E O U T S I D E I N S T A L L A T I O N C22401323 CO N C R E T E B L O C K I N G F O R H O R I Z O N T A L 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 6 0 . d w g | L a y o u t : C 2 2 4 0 1 6 0 S I T E U T I L I T Y A N D P I P I N G C O R R I D O R P R O F I L E 1 P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 5 6 : 2 5 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l P i p e _ C 3 D . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240160 D. S a a r e n a s B. I d d i n s E. D a v i d o H.1"=20'; V.1"=10'0E. DavidoMATCH LINE M A T C H L I N E SC A L E : SC A L E : 33 7 2 3 H. 1 " = 2 0 ' ; V . 1 " = 1 0 ' ME C H A N I C A L P I P I N G P R O F I L E C2 2 4 0 1 3 2 A. 2 H. 1 " = 2 0 ' ; V . 1 " = 1 0 ' ME C H A N I C A L P I P I N G P R O F I L E C2 2 4 0 1 3 1 A. 1 RE F E R T O M 2 2 2 3 1 0 1 FO R A B O V E G R A D E PI P I N G I N T H I S A R E A 12345 DE S I G N E D / D R A W N : PR O J E C T E N G I N E E R : PR O J E C T A C C E P T A N C E : DE S I G N A P P R O V A L : CONTRACT NO:DRAWING NO:PROJECT FILE NO:SCALE:FACILITY NUMBER:DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISIONDATE:SHT NO / TOTAL REV NO: B O R D E R F I L E E D I T I O N : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r 12345EFGH BC D A CHECKED: R E F E R E N C E 1 " 0 P : \ C l i e n t s \ k i n g c o u n t y \ B C \ o n - c a l l b c \ s o u t h p l a n t w w t p \ _ C A D \ 0 2 - S H E E T S \ C - C I V I L \ 2 2 4 - 1 1 2 3 6 2 6 C 2 2 4 0 1 6 1 . d w g | L a y o u t : C 2 2 4 0 1 6 1 S I T E U T I L I T Y A N D P I P I N G C O R R I D O R P R O F I L E 2 P L O T T E D : D e c 2 2 , 2 0 1 7 - 0 6 : 5 6 : 4 0 p m B y d s a a r e n a s X R E F S : K C W T D - 2 0 1 5 R 0 - D s i z e - T B - B o r d e r . d w g ; 2 2 4 - 1 1 2 3 6 2 6 C i v i l P i p e _ C 3 D . d w g ; _ W A S H I N G T O N - S E A L _ E D . d w g I M A G E S : SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTSJAN 2018 15-xxxxxxx NO R E V I S I O N D E S C R I P T I O N B Y A P V D D A T E EFGH BC D A S. H i l d r e t h PR E L I M I N A R Y I S S U E D R A W I N G 60 % R E V I E W JA N U A R Y 2 0 1 8 C2240161 D. S a a r e n a s B. I d d i n s E. D a v i d o H.1"=20'; V.1"=10'0E. Davido SC A L E : SC A L E : 33 7 2 3 H. 1 " = 2 0 ' ; V . 1 " = 1 0 ' ME C H A N I C A L P I P I N G P R O F I L E C2 2 4 0 1 3 2 B H. 1 " = 2 0 ' ; V . 1 " = 1 0 ' ME C H A N I C A L P I P I N G P R O F I L E C2 2 4 0 1 3 2 C