Loading...
HomeMy WebLinkAboutP_Floor_Elevation_Plans_180309_v1w U Z w w LL w r'l 0 5 4 0 J Z3 0 c� J 0 0 0 0 0 0 Q 2 co co N It N N J Q W U w U Q , Q Q U) H w w 2 co N D Q U � 1 0 0 0 c� o m o c � � EL m o E m 0g m 0 cQ M ~ N U N N -0 66 cn o U) C) � r c N o U I� CV o > c . U Q Y �W�(n LLI kI~-- LL w Q cn O � U d X 7. A ♦ B ♦ C ♦ D ♦ E ♦ F ® G ♦ H A ♦ B ♦ C ♦ D ♦ E ♦ F ♦ G ♦ H II i 4 1 i 1 MATERIALS AND SYMBOLS LEGEND EGRESS PLAN SYMBOLS REFLECTED CEILING PLAN SYMBOLS MATERIALS ARCHITECTURAL SYMBOLS CEILING MATERIALS & SYMBOLS SMOKE PARTITION WORK POINT FOR CEILING + TILE/PANEL GRID @ WALL = _ ` _` `=' -"`_ °_` " ` GYPSUM BOARD DOOR IDENTIFICATION W.P. INTERSECTIONS, OR AS NOTED F) 1 HOUR RATED - FIRE BARRIER Z EXIT SIGN EXTERIOR SHEATHING (REF: DRAWINGS) 2 HOUR RATED -FIRE BARRIER SUSPENDED T -GRID & ACT, 2'x4' - GYPSUM SHEATHING, TYP. - PLYWOOD SHEATHING AS NOTED OA3 WALL TYPE SUSPENDED T -GRID & ACT, 2'x2' COMMON PATH OF TRAVEL OR EXIT mom BATT INSULATION ACCESS TRAVEL, AS NOTED AS EED ♦ EMERGENCY EXIT DISCHARGE EXPOSED STRUCTURAL DECKING WINDOW /STOREFRONT TYPE AC - ALUM. CURTAINWALL AS - ALUM. STOREFRONT RIGID INSULATION AW - ALUM. WINDOW EXIT EXIT ENCLOSURE HM - HOLLOW METAL LIGHT FIXTURES 'qL 1 LOUVER TYPE ACCESSIBLE AREA OF REFUGE ® PENDANT LINEAR FIXTURE SUSPENDED ACOUSTIC AL - ALUM. LOUVER HM - HM LOUVER CEILING TILE OPENDANT FIXTURE (S.A.C.T) EXIT SIGN, REFER TO RCP'S FOR EXACT LOCATIONS D WALL MOUNTED FIXTURE a a"a a e. o ° ,Q .,ao CONCRETE A� TOILET ACCESSORY INDICATOR AOR AREA OF REFUGE SIGN, REFER TO Q EXTERIOR WALL MOUNTED FIXTURE RCP'S FOR EXACT LOCATION RECESSED 2'x4' FIXTURE BRICK FEC FIRE EXTINGUISHER CABINET ST1 STAIR INDICATOR � ❑ RECESSED 2'x2' FIXTURE DR EXIT LOAD DR OCCUPANT CAPACITY DOOR TAG CONCRETE MASONRY UNITS (CMU) O RECESSED DOWNLIGHT ROOM NAME 101 ROOM TAG SF SF =ROOM AREA MECHANICAL & ELECTRICAL FIXTURES STEEL SF / OLF / OCC LOAD OLF = OCCUPANT LOAD FACTOR OCC LOAD = OCCUPANCY LOAD El MECH RETURN GRILLES (REF: MECH) SOLID WOOD BLOCKING STAI EXIT OAD STAIR OC PAN CAPACITY STAIR TAG MECH SUPPLY GRILLES (REF: MECH) a SIDEWALL SUPPLY GRILLE (REF: MECH) WOOD FRAMING, CONTINUOUS WOOD WOOD TRIM METAL STUD FRAMING 1 I I1 I I1 I I1 1I— NATIVE OR COMPACTED SOIL GRAVEL JAMES Brown K R ESS BAC H 6605 REGISTERED ARCHITECT DESIGNED/DRAWN: J. Kressbach CHECKED: � � DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISION SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTS DATE: NOV 2017 PRELIMINARY ISSUE DRAWING INFORMATION ONLY PROJECT ENGINEER: J. Kressbach SCALE: As Noted PROJECT FILE NO: 15—XXXXXXX AND . Caldwell AIA ARCHITECT O 6 0 O REVIEW JAMES WA SSBACH STATE OF WASHINGTON King Count MATERIALS AND SYMBOLS LEGEND DESIGN APPROVAL: G. Newman FACILITY NUMBER: DRAWING NO: A0000001 SHT NO / TOTAL REV NO: 0 PROJECT ACCEPTANCE: S. Hildreth CONTRACT NO: �/ NO REVISION DESCRIPTION BY APVD DATE A ♦ B ♦ C ♦ D ♦ E ♦ F ♦ G ♦ H II i 4 1 i 1 w U Z W W LL W ME 0 J 0 J U) N 0 0 0 0 0 0 Q N 4 N N J Q U w _ U Q g I - w w co N 0 Q U E 0 0 0 c� 0 o Fn c I.0 � m o E m 0 0m)m CQL� c9 0 U N m N Q co p cn o cn0 � r Y o N o U I- C, 2,> c . U C) Y �W C/) L61 LL U) W � � I U d X 0 IV C ABBREV MEANING x E A F A G A H GENERAL ARCHITECTURAL NOTES 5 AL ALUMINUM 1. DO NOT SCALE THE DRAWINGS. THE CONTRACTOR SHALL USE THE ACTUAL FIELD MEASUREMENTS, 5 ALT ALTERNATIVE, ALTERNATE DIMENSIONED DRAWINGS AND WRITTEN SPECIFICATIONS. B/ BOTTOM OF BLDG BUILDING 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, TRADES AND EXISTING CONDITIONS PRIOR TO BOT BOTTOM STARTING CONSTRUCTION. IN CASE OF CONFLICTS BETWEEN DRAWINGS AND/OR EXISTING CDF CONTROLLED DENSITY FILL CONDITIONS, NOTIFY THE PROJECT REPRESENTATIVE IMMEDIATELY. DO NOT PERFORM RELATED CJ CONSTRUCTION JOINT WORK UNTIL THE CONFLICT HAS BEEN RESOLVED. CJP COMPLETE JOINT PENETRATION CL CENTERLINE 3. REPETITIVE FEATURES WHICH ARE DRAWN AND/OR LABELED ONCE, SHALL APPLY TO ALL OTHER LIKE CMU CONCRETE MASONRY UNIT PORTIONS OF THE WORK AND SHALL BE PROVIDED AS IF DRAWN AND/OR LABELED IN FULL. COL COLUMN CONC CONCRETE 4. VERIFY ALL ROUGH -IN REQUIREMENTS AND DIMENSIONS. CONT CONTINUOUS CSK COUNTERSUNK 5. ALL DIMENSIONS ARE FROM FACE OF CONCRETE, CMU, OR METAL FRAMING OR FROM CENTER LINE CTR CENTER OF STRUCTURE. DET DETAIL DIA DIAMETER 6. ALL OPENINGS ARE DIMENSIONED FROM FACE OF EXPOSED CONCRETE OR CMU UNLESS NOTED DIST DISTANCE OTHERWISE. DWG DRAWING 4 EF EACH FACE 7. CONTRACTOR SHALL VERIFY THE SIZES AND LOCATIONS OF ALL OPENINGS FOR MECHANICAL AND 4 EL ELEVATION HVAC EQUIPMENT. THE CONTRACTOR SHALL PROVIDE SHOP DRAWINGS TO BE REVIEWED BY THE EMBED EMBEDMENT PROJECT REPRESENTATIVE FOR COORDINATION BEFORE PROCEEDING. EQ EQUAL EQUIP EQUIPMENT EXIST EXISTING EXP EXPANSION EXT EXTERIOR FD FLOOR DRAIN FLG FLANGE FRP FIBERGLASS REINFORCED PLASTIC BUILDING CODE INFORMATION GA GAGE GRTG GRATING JURISDICTION CITY OF RENTON HORIZ HORIZONTAL APPLICABLE CODE UNIFORM BLDG CODE (IBC) LATEST EDITION HSS HOLLOW STEEL SECTION OCCUPANCY F-1 FACTORY MODERATE HAZARD IBC INTERNATIONAL BUILDING CODE CONSTRUCTION TYPE II -B, NONCOMBUSTIBLE MATERIALS IE INVERT ELEVATION ALLOWABLE FLOOR AREA 62,000 SQ FT IF INSIDE FACE GROSS FLOOR AREA 8506 SQ FT 3 INSUL INSULATION OCCUPANT LOAD 28 (300 SQ FT / OCCUPANT) 3 INT INTERIOR BUILDING HEIGHT L ANGLE ALLOWED PER ZONING35 FT LVL LEVEL PROPOSED 30 FT MAX MAXIMUM ZONING HEAVY INDUSTRIAL MECH MECHANICAL SPRINKLERS PROVIDED OC ON CENTER FIRE ALARMS PROVIDED OF OUTSIDE FACE GAS LEAKAGE ALARMS PROVIDED OPNG OPENING VENTILATION MEET NFPA 820 REQUIREMENTS OPP OPPOSITE EXIT HARDWARE PANIC DEVICE ON ELECTRICAL ROOM DOORS PJF PREMOULDED JOINT FILLER FIRE SEPARATION DISTANCE PROVIDED, 10 FT FROM ADJACENT BUILDING PL PLATE, PROPERTY LINE TWO EXITS PROVIDED FROM COMPRESSOR, BOILER AND ELECTRICAL ROOMS R RISER REINF REINFORCING, REINFORCEMENT ACCESSIBILITY NOT REQUIRED, ACCESS IS ONLY TO SERVICE EQUIPMENT RET RETURN RO ROUGH OPENING ENERGY CODE SIM SIMILAR SL SLOPE CONFORM TO ALL REQUIREMENTS OF THE NON-RESIDENCIAL WASHINGTON STATE ENERGY CODE, LATEST EDITION, SP SPACE PRESCRIPTIVE METHOD, INCLUDING THE FOLLOWING: 2 SPEC SPECIFICATION 2 SST STAINLESS STEEL ALL SPACES ARE SEMI -HEATED EXCEPT THE CONTROL ROOM. ST STEEL ELECTRIC RESISTANT HEAT IS NOT ALLOWED. STD STANDARD OPAQUE DOORS: MAX U/A 0.60 SYM SYMMETRICAL VERTICAL GLAZING: MAX U/A 0.90 T TREAD WALL INSULATION R-19 T&B TOP AND BOTTOM ROOF INSULATION R-42 T/ TOP OF TOS TOP OF SLAB, TOP OF STEEL TOT TOTAL TS STRUCTURAL TUBE TYP TYPICAL UNO UNLESS NOTED OTHERWISE VERT VERTICAL W WIDE FLANGE W WIDE, WIDTH W/ WITH W/0 WITHOUT WSTP WATERSTOP WWF WELDED WIRE FABRIC F 1 PNO A REVISION DESCRIPTION a DATE FBwnAND well JAMES K R ESS BAC H AIA ARCHITECT L PRELIMINARY ISSUE DRAWING INFORMATION ONLY 60% REVIEW 0 6605 REGISTERED ARCHITECT JAMES KRESSBACH STATE OF WASHINGTON Lm DESIGNED/DRAWN: CHECKED: J. Kress PROJECT ENGINEER: SCALE: J. Kressbach As Noted DESIGN APPROVAL: FACILITY NUMBER: R, New PROJECT ACCEPTANCE: CONTRACT NO: S. Hildreth F 110 King County DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISION SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTS ABBREVIATIONS AND GENERAL NOTES BUILDING CODE INFORMATION L DATE: NOV 2017 PROJECT FILE NO: 15-xxxxxxx DRAWING NO: A0000002 SHT NO / TOTAL REV 0 NO: H w U Z W W LL W ME E N N N Y co m c W N r 4 N � N � J � Q U L U coo W N H � 2 N U r Q N Q M 0 N o � cn N N O) _O m E L Amo Em 0 O M M cf) N ~ C O O U N U) �r � r L[) N O I U - CV o > c . U C) Y �W Cl)(i LL U) w O Er U d X DIN on on no f1 B A C D A E A F I----------------- OUTLINE ----------------OUTLINE OF BUILDING ABOVE EDGE OF FOUNDATION SLAB n\/C AI 1 TI InIKICI DI AKI EXISTING SOLIDS MCC BUILDING GENERAL NOTES: 1. XXXXXX in ■[! IN LEGEND CAST IN PLACE CONCRETE WALLS N 000 00 0000 X IN 00 � 1 0000 ® AREA SHOWN ON THIS PLAN HERB KEY PLAN NO SCALE DESIGNED/DRAWN: CHECKED: DEPARTMENT OF NATURAL RESOURCES & PARKS DATE: PRELIMINARY ISSUE DRAWING J.Kressbach WASTEWATER TREATMENT DIVISION NOV 2017 JAMES 6605 REGISTERED SOUTH TREATMENT PLANT INFORMATION ONLY ARCHITECT PROJECT ENGINEER: SCALE: BIOGAS AND HEAT SYSTEMS IMPROVEMENTS PROJECT FILE NO: Brown AND . K R ESS BAC H J. Kressbach As Noted 15-XXXXXXX Caldwell AIA JAMES KRESSBACH DESIGN APPROVAL: FACILITY NUMBER: HEATING AN D ENERGY RECOVERY BUILDING DRAWING NO: La 6 �o REVIEW STATE OF WASHINGTON R. Newman King County OVERALL TUNNEL A2240001 ARCHITECT PROJECT ACCEPTANCE: CONTRACT NO: r/ IS. Hildreth PLAN SHT NO / TOTAL REV NO REVISION DESCRIPTION BY APVD DATE NO: A v B v C v D v E vF G v H CMU WALLS RIGID INSULATION STUD WALLS N 000 00 0000 X IN 00 � 1 0000 ® AREA SHOWN ON THIS PLAN HERB KEY PLAN NO SCALE DESIGNED/DRAWN: CHECKED: DEPARTMENT OF NATURAL RESOURCES & PARKS DATE: PRELIMINARY ISSUE DRAWING J.Kressbach WASTEWATER TREATMENT DIVISION NOV 2017 JAMES 6605 REGISTERED SOUTH TREATMENT PLANT INFORMATION ONLY ARCHITECT PROJECT ENGINEER: SCALE: BIOGAS AND HEAT SYSTEMS IMPROVEMENTS PROJECT FILE NO: Brown AND . K R ESS BAC H J. Kressbach As Noted 15-XXXXXXX Caldwell AIA JAMES KRESSBACH DESIGN APPROVAL: FACILITY NUMBER: HEATING AN D ENERGY RECOVERY BUILDING DRAWING NO: La 6 �o REVIEW STATE OF WASHINGTON R. Newman King County OVERALL TUNNEL A2240001 ARCHITECT PROJECT ACCEPTANCE: CONTRACT NO: r/ IS. Hildreth PLAN SHT NO / TOTAL REV NO REVISION DESCRIPTION BY APVD DATE NO: A v B v C v D v E vF G v H w U Z w LU w O 0 -a 0 E cr LU 0 N 0 M N 4 N N Y d of p M O O Q' U 2 co N 0 M N 4 N N 3 ca a E CL 07 LU U a� LU 0 N 0 M c ca d 4 N O N O U- D o, ca d J CJ U) L N 0 0 C) M O N T Q N co N M N -2'O g N d J00 Qry � U I 1--U Q LU 0 M 0 M r Q T (n N w LU -0 = E cn � N p al Q o U _O I L 0 M 0 O M N0, N i 0 � y N O N O OE oa c � � ca >, am0 m (E6 m U) O M M ~ N O UN O O •O C) C/) r I cn0 Y o N O U f� N p O > I.— �zU �pY I0 w U) U YL C w U0 -X 41 IM 21 0 N M 40701 B A C D A E A F n1w S 134'-0" 45'-0" 1 88'-0" 405B 405C 1 L I I I I I BOILER ROOM 22405 HVAC ROOM 22406 43'-0" A224051 A r, HM 2 /ll a 411 v El ENTRYWAY 22404IX STAIR 22403 N IXP 0 r .q c5� Q a PRODUCT COMPRESSOR ROOM 22410 10C II II � INSTRUMENT ROOM 22409 0 I o 1) A2240701 a 10B A A22�051 1 11-011 134'-0" FLOOR PLAN SCALE: 1/8"=l' -O" 1'-0" MCC Room I I I I I 1372 I I IIL------------------------ ________ L — — — — — — — — — — — — — — — — — — — — — — — L-------------------------Ln-L--------- 12C ELECTRICAL ROOM -K 22412 FEED COMPRESSOR ROOM 22411 OUTLINE OF CANOPY ROOF O _1 co N O N M 10 ~ lq4- N a G H GENERAL NOTES: 1. XXXXXX 15 14 13 LEGEND 0 CAST IN PLACE CONCRETE WALL 8" CMU WALLS 2 RIGID INSULATION STUD WALLS ® AREA SHOWN ON THIS PLAN NO SCALE DESIGNED/DRAWN: CHECKED: DEPARTMENT OF NATURAL RESOURCES & PARKS DATE: PRELIMINARY ISSUE DRAWING J. Kressbach WASTEWATER TREATMENT DIVISION NOV 2017 JAMES 6605 REGISTERED SOUTH TREATMENT PLANT INFORMATION ONLY ARCHITECT PROJECT ENGINEER: SCALE: � BIOGAS AND HEAT SYSTEMS IMPROVEMENTS PROJECT FILE NO: Brown AND . K R ESS BAC H J. Kressbach As Noted 15-XXXXXXX Caldwell AIA JAMES KRESSBACH DESIGN APPROVAL: FACILITY NUMBER: HEATING AN D ENERGY RECOVERY BUILDING DRAWING NO:60 REVIEW STATE OF WASHINGTON R. Newman GROUNDFLOOR A224 0101ARCHITECT PROJECT ACCEPTANCE: CONTRACT NO: King County 1 HT N NO REVISION DESCRIPTION BY APVD DATES. Hildreth PLAN TOTAL REV 0 NO: A v B v C v D v E v F G v H w I Z W LU W O 0 c U ca d =0 N C N D O N J N NCZ C) d O > � O N Y Nd Q m M M N N N cz J C C w I O C Q ry M Q C9 M Q N w W N 2 N N_ p Q � C d _il U c0 � E (.o � N c/) cfl M N0, N y N O N O) O_ m oa c ca Amo 0mm m O N N ~ LOO U N O •� - p C/) r I c') c) a�ry Y o 6) N o U f� N .O = p 0>� �zU �pY �WUU Y W C W Ca -X 0 5 4 3 2 A RESTROOM 22407 2 A22�� 1 REVISION DESCRIPTION IV C I] E F EXISTING SOLIDS MCC BUILDING I I I I I I I I I IIL------------------------ II IL------------------------ -------- I'll L — — — — — — — — — — — — — — — — — — — — — — — — — Lru ---------JLr-Li J BY IAPVD DATE B 1 A2240701 REFLECTED CEILING PLAN SCALE: 1/8"=l' -O" FBrown,�o . Caldwell JAMES KRESSBACH AIA ARCHITECT L PRELIMINARY ISSUE DRAWING INFORMATION ONLY 60% REVIEW 0 6605 REGISTERED ARCHITECT JAMES KRESSBACH STATE OF WASHINGTON C J OUTLINE OF CANOPY ROOF DESIGNED/DRAWN: CHECKED: J. Kress PROJECT ENGINEER: SCALE: J. Kressbach As Noted DESIGN APPROVAL: FACILITY NUMBER: R. Newman PROJECT ACCEPTANCE: CONTRACT NO: S. Hildreth F s 0 King County A GENERAL NOTES: 1. XXXXXX H ® AREA SHOWN ON THIS PLAN WWTP KEY PLAN DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISION SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTS HEATING AND ENERGY RECOVERY BUILDING REFLECTED CEILING PLAN Le NO SCALE DATE: NOV 2017 PROJECT FILE NO: 15-xxxxxxx DRAWING NO: A2240102 SHT NO / TOTAL REV 0 NO: H 5 H 3 2 w I Z W w LL w rP M. c �a � Y cz w 4- o r 0 o >. p cB J 4L O O ry � U Q O > N = O O N N (p N co r co co 4 N N � N r N N J Q (B r d Uc/) w C/) CO N 2 co U co ry N 04 (/) N w 2 � p wl U o ry I cB 0 L Q co co : O co N i o � I O , N N O I p � i m E o a m o Em O -05 � N i Q N 0 r ry Y o N O I U CV I>� A- zv p Y i �wc� i Y LL C W I �OJcr-Z I U d x 51 41 31 21 1 PNO 0 A REVISION DESCRIPTION B A C A D A E A F TAPERED INSULATION nr+) mr�rr-� o nom) ir�r�rr� o FBrown,�o . Caldwell JAMES K R ESS BAC H AIA ARCHITECT L PRELIMINARY ISSUE DRAWING INFORMATION ONLY 60% REVIEW 0 CANOPY ROOF BELOW DESIGNED/DRAWN: CHECKED: 6605 REGISTERED J. Kressbach ARCHITECT PROJECT ENGINEER: SCALE: J. Kressbach As Noted DESIGN APPROVAL: FACILITY NUMBER: JAMES KRESSBACH STATE OF WASHINGTON G. Newman PROJECT ACCEPTANCE: CONTRACT NO: S. Hildreth LZ F TAPERED INSULATION SLOPED 1/4" PER FT, TYP. Ll King County G GENERAL NOTES: 1. xxxxxx H ® AREA SHOWN ON THIS PLAN WWTP KEY PLAN DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISION SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTS HEATING AND ENERGY RECOVERY BUILDING ROOF PLAN If NO SCALE DATE: NOV 2017 PROJECT FILE NO: 15-xxxxxxx DRAWING NO: A2240201 SHT NO / TOTAL REV 0 NO: H 15 4 13 2 w U Z w w LL w M. V) c O U O cn O7 C m 7 O cB J O) O U-) O It N N Q co co N r 4 N N J Q ry U w U ry Q Q w w 2 cl? Im N U � m (B � E U) N coco N0, N O 4 cn N m N 17)O m o -P L LL W OO E 'W OO W '^ Vf! O C NO U N U) cn�o � r L[7 N O U I� CV o > c . U C) Y �wCf) (i LL U) w O Er U d X 5 4 3 2 A A B A C A D A E A F A G HVAC AND BOILER ROOMS SECTION SCALE: 1/8" -l' -O" A22�050 1 SMALL COMPRESSOR ROOM AND LOBBY SECTION SCALE: 1/8"-1'-0" A22�050 1 LARGE COMPRESSOR AND ELECTRICAL ROOM SECTION SCALE: 1/8"-1'-0" A22�� 1 LARGE COMPRESSOR ROOM ELECTRICAL ROOM AND TUNNEL SECTION SCALE: 1/8"-1'-0" A22�050 1 H DESIGNED/DRAWN: CHECKED: DEPARTMENT OF NATURAL RESOURCES & PARKS DATE: PRELIMINARY ISSUE DRAWING J. Kressbach WASTEWATER TREATMENT DIVISION NOV 2017 JAMES 6605 REGISTERED SOUTH TREATMENT PLANT INFORMATION ONLY ARCHITECT PROJECT ENGINEER: SCALE: BIOGAS AND HEAT SYSTEMS IMPROVEMENTS PROJECT FILE NO: Brown AND . K R ESS BAC H J. Kressbach As Noted 15-XXXXXXX Caldwell AIA JAMES KRESSBACH DESIGN APPROVAL: FACILITY NUMBER: HEATING AND ENERGY RECOVERY BUILDING DRAWING NO: 60% REVIEW Lj STATE OF WASHINGTON G. Newman • ARCHITECT KingCount BUILDING SECTIONS A2240501 PROJECT ACCEPTANCE: CONTRACT NO: r/ IS. Hildreth SHT NO / TOTAL REV 0 NO REVISION DESCRIPTION BY APVD DATE NO: A v B v C v D v E v F G v H 5 4 3 2 U-1 U Z w W LL w ME V) c O U O U) O7 C m 7 O cB J O) N 0 L(7 O N N Q c) N r 4 N N J Q U w U Q Q I— w w 2 cl? o N D � U � m (B � E U) N coco N0, N O 4 cn N m N O) O m o -P Amo Em 0 o mm Cn M ~ C MO U N U) o � r Y o N O U I� CV o>� c . U C) Y �W Cf) L61 LL U) W � � I U m x 5 4 3 2 1 PNO A A B A C A D A E A F A G A REVISION DESCRIPTION FBwnAND well JAMES K R ESS BAC H AIA ARCHITECT If BOILER ROOM LOBBY AND ELECTRICAL ROOM SECTION SCALE: 1/8"-1'-0" A22�� 2 PRELIMINARY ISSUE DRAWING INFORMATION ONLY 60% REVIEW 0 BOILER ROOM SMALL AND LARGE COMPRESSOR ROOMS 6605 REGISTERED ARCHITECT JAMES KRESSBACH STATE OF WASHINGTON LZ SECTION SCALE: 1/8" -l' -O" A22�� 2 DESIGNED/DRAWN: CHECKED: J. Kress PROJECT ENGINEER: SCALE: J. Kressbach As Noted DESIGN APPROVAL: FACILITY NUMBER: G. Newman PROJECT ACCEPTANCE: CONTRACT NO: S. Hildreth F 110 King County DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISION SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTS HEATING AND ENERGY RECOVERY BUILDING BUILDING SECTIONS L W DATE: NOV 2017 PROJECT FILE NO: 15-xxxxxxx DRAWING NO: A2240502 SHT NO / TOTAL REV 0 NO: H 5 4 2 w U Z W W LL W ME I 0 w 0 m J U) L(7 O N N Q C-0 3 c) -o N � N r W N (n / L J � Q O N O (h U N w = N U N Q � Q U 1— o w m w > r cn w N 0 U X w I �. U Q O M 0 N o 4 cn N N o m o -P Amo Em 0 o mm r- cf)L� d -o U N U) 1 o � r Y o N O U I� CV >� c . U C) Y �W Cl) L61 LL U) W � � I U m X 5 4 3 2 1 PNO 0 A REVISION DESCRIPTION IV a DATE FBwnAND well C A D A E A F A G A H JAMES K R ESS BAC H AIA ARCHITECT L LOUVER SEE MECF 25 CIP CON( \ hl WEST ELEVATION SCALE: 1/8" -l' -O" A2240511 E F G S2240502 S2240502 S2240503 PRELIMINARY ISSUE DRAWING INFORMATION ONLY 60% REVIEW 0 J J J A VIVIIRAM , TYP. AND FRAME, TYP. 6605 REGISTERED ARCHITECT JAMES KRESSBACH STATE OF WASHINGTON LZ DESIGNED/DRAWN: CHECKED: J. Kress PROJECT ENGINEER: SCALE: J. Kressbach As Noted DESIGN APPROVAL: FACILITY NUMBER: G. Newman PROJECT ACCEPTANCE: CONTRACT NO: S. Hildreth F NORTH ELEVATION SCALE: 1/8" -l' -O" A2240511 110 King County KEY NOTES OA CONCRETE TEXTURE A © CONCRETE TEXTURE B © CONCRETE TEXTURE C DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISION SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTS HEATING AND ENERGY RECOVERY BUILDING EXTERIOR ELEVATIONS If DATE: NOV 2017 PROJECT FILE NO: 15-xxxxxxx DRAWING NO: A2240511 __ SHT NO / TOTAL REV 0 NO: H .01 4 91 2 w U Z W W LL W ME 0 0 w Z3 0 m J O) N L(7 O N N Q C-0 3 M -O N � N r W N (n / L J � Q O N O I- M U N w = N U N Q � Q U 1- o III m w > r cn w N L 6 O Q UI x w I cB L) �. U Q O M � M 0 N o 4 cn N N o m o -P c � � Amo Em 0m m 0 � a� C N_ UCO o � r Y o N O U I-- cV >� c . U C) Y �W Cl) L61 LL U) W � � I U m X 51 41 31 21 1 PNO 0 A REVISION DESCRIPTION IV a DATE FBwnAND well C A D A E A F A G A H JAMES K R ESS BAC H AIA ARCHITECT If G S2240503 F S2240502 E S2240502 PRELIMINARY ISSUE DRAWING INFORMATION ONLY 60% REVIEW 0 DESIGNED/DRAWN: CHECKED: 6605 REGISTERED J. Kressbach ARCHITECT PROJECT ENGINEER: SCALE: J. Kressbach As Noted DESIGN APPROVAL: FACILITY NUMBER: JAMES KRESSBACH STATE OF WASHINGTON G. Newman PROJECT ACCEPTANCE: CONTRACT NO: S. Hildreth LZ F 110 King County KEY NOTES OA CONCRETE TEXTURE A © CONCRETE TEXTURE B © CONCRETE TEXTURE C DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISION SOUTH TREATMENT PLANT BIOGAS AND HEAT SYSTEMS IMPROVEMENTS HEATING AND ENERGY RECOVERY BUILDING EXTERIOR ELEVATIONS L DATE: NOV 2017 PROJECT FILE NO: 15-xxxxxxx DRAWING NO: A2240512 SHT NO / TOTAL REV 0 NO: H r 4 2