HomeMy WebLinkAboutRS_TRAF-2017-12-14-TENW Forest Terrace Preliminary Plat Renton, WA Transportation Impact Analysis December 14, 2017 Prepared for: PulteGroup 3535 Factoria Blvd SE, Suite 110 Bellevue, WA 98006 Prepared by: TENW Transportation Engineering NorthWest 11400 SE 8th Street, Suite 200 Bellevue, WA 98004 Office: (425) 889-6747 Fax: (425) 889-8369 Transportation Impact Analysis Forest Terrace Preliminary Plat TENW December 14, 2017 Page i Table of Contents FINDINGS/CONCLUSIONS ........................................................................................ 1 INTRODUCTION ....................................................................................................... 2 Project Description ..................................................................................................... 2 Project Approach ...................................................................................................... 2 Primary Data and Information Sources ........................................................................... 2 EXISTING CONDITIONS ............................................................................................. 5 Roadway Network .................................................................................................... 5 Existing Traffic Volumes ............................................................................................... 5 Public Transportation Services ...................................................................................... 5 Level of Service ......................................................................................................... 7 Collision History ........................................................................................................ 8 FUTURE TRAFFIC CONDITIONS ................................................................................... 9 Planned Transportation Improvements ............................................................................ 9 Project Trip Generation ............................................................................................. 10 Project Trip Distribution and Assignment ....................................................................... 10 Future Traffic Volumes ............................................................................................... 10 Future Level of Service .............................................................................................. 14 MITIGATION .......................................................................................................... 14 Appendices Appendix A – Peak Hour Turning Movement Counts Appendix B – Level of Service (LOS) Calculations Appendix C – Trip Generation Calculations Transportation Impact Analysis Forest Terrace Preliminary Plat TENW December 14, 2017 Page ii List of Figures and Tables Figure 1 Project Site Vicinity ....................................................................................................... 3 Figure 2 Preliminary Site Plan ..................................................................................................... 4 Figure 3 Year 2017 Existing Peak Hour Traffic Volumes .................................................................. 6 Figure 4 Project Trip Distribution & Assignment ............................................................................. 11 Figure 5 2021 No Action Peak Hour Traffic Volumes ................................................................... 12 Figure 6 2021 With-Project Peak Hour Traffic Volumes ................................................................. 13 Table 1 Existing Roadway Network Summary – Project Site Vicinity .................................................. 5 Table 2 LOS Criteria for Signalized and Stop-Controlled Intersections1 .............................................. 7 Table 3 2017 Existing Peak Hour LOS Summary .......................................................................... 8 Table 4 Collision Data Summary, January 1, 2014 to December 31, 2016 ...................................... 8 Table 5 Trip Generation Summary ............................................................................................ 10 Table 6 Project Trip Distribution................................................................................................ 10 Table 7 Year 2021 Peak Hour Level of Service Summary ............................................................. 14 Transportation Impact Analysis Forest Terrace Preliminary Plat TENW December 14, 2017 Page 1 FINDINGS/CONCLUSIONS This traffic impact analysis (TIA) has been prepared for the proposed Forest Terrace Preliminary Plat project located on the west side of Union Avenue NE in the vicinity of NE 27th Place in Renton, WA. Project Proposal. The proposed Forest Terrace Preliminary Plat project includes the development of 25 detached single-family lots. The existing site includes one single-family home, which will be removed with the proposed project. Vehicular access to the site will be provided to Union Avenue NE by a proposed road that would align with the existing NE 27th Place. Project buildout is expected by 2021. Trip Generation. The proposed project is estimated to generate 281 net new weekday daily trips with 22 net new trips occurring during the weekday AM peak hour (6 in, 16 out) and 26 net new trips occurring during the weekday PM peak hour (16 in, 10 out). The trip generation reflects credit for the existing home that will be removed. Future Year LOS. LOS analyses were conducted for future year 2021 AM and PM peak hour conditions at the Union Avenue NE/NE 27th Place study intersection. Based on the analysis results, all controlled movements are expected to operate at LOS B or better in 2021 with the proposed Forest Terrace Preliminary Plat project. Mitigation Off-Site Improvements. Based on the results of the LOS analysis, no project-specific off-site transportation mitigation is proposed. Transportation Impact Fees. To mitigate long-term traffic impacts, the City of Renton requires payment of a traffic impact fee. The CityÊs currently adopted 2017 impact fee rate is $5,430.85 per single family house. Based on the current proposed lot count and credit for the existing home to removed, the net transportation impact fee for the proposed project would be $130,340.40. The CityÊs transportation impact fee rate is subject to change. Transportation Impact Analysis Forest Terrace Preliminary Plat TENW December 14, 2017 Page 2 INTRODUCTION This traffic impact analysis (TIA) has been prepared for the proposed Forest Terrace Preliminary Plat project located on the west side of Union Avenue NE in the vicinity of NE 27th Place as shown in the Figure 1 Vicinity Map. Project Description The proposed Forest Terrace Preliminary Plat project would include the development 25 detached single-family lots. The existing site includes one single-family home, which will be removed with the proposed project. Vehicular access will be provided to Union Avenue NE by a proposed road that would align with the existing NE 27th Place. Full buildout of the project is expected by 2021. An analysis year of 2021 was used for this study. A preliminary site plan is provided in Figure 2. Project Approach To analyze the traffic impacts from the project, the following tasks were undertaken: • Assessed existing conditions through field reconnaissance and reviewed existing planning documents; • Described and assessed existing transportation conditions in the area; • Documented collision histories at study intersections; • Documented planned transportation improvements in the site vicinity; • Documented existing traffic volumes and intersection levels of service (LOS) at the Union Avenue NE/NE 27th Place study intersection during the weekday AM and PM peak hours; • Estimated trip generation and documented trip distribution and assignment of weekday daily, AM and PM peak hour project-generated traffic; • Documented traffic forecasts and assumptions for year 2021 conditions at the study intersection without and with the proposed development; • Analyzed weekday AM and PM peak hour LOS for year 2021 conditions at the study intersection without and with the proposed development; • Identified transportation mitigation to the City of Renton. Primary Data and Information Sources • City of Renton Comprehensive Plan Transportation Element, June 22, 2015. • City of Renton 2018 - 2023 Transportation Improvement Program. • ITE Trip Generation Manual, 10th edition, 2017. • AM and PM Peak Hour traffic counts by All Traffic Data, June 2017. • Highway Capacity Manual (HCM 6th Edition), 2016. • Washington State Department of Transportation (WSDOT) Collision Data, 2014- 2016. Transportation Impact Analysis Forest Terrace Preliminary Plat TENW December 14, 2017 Page 3 Figure 1 Project Site Vicinity Transportation Impact Analysis Forest Terrace Preliminary Plat TENW December 14, 2017 Page 4 Figure 2 Preliminary Site Plan Transportation Impact Analysis Forest Terrace Preliminary Plat TENW December 14, 2017 Page 5 EXISTING CONDITIONS Roadway Network The primary travel route to and from the site in the City of Renton includes Union Ave NE. A description of this roadway is included in Table 1 below. Table 1 Existing Roadway Network Summary – Project Site Vicinity Roadway Orientation Classification Speed Limit Number of Lanes Street Parking Edge Condition Union Ave NE N-S Minor Arterial 35 2 None Paved Shoulder Existing Traffic Volumes Existing weekday AM and PM peak hour traffic volumes at the Union Ave NE / NE 27th Place study intersection were based on counts conducted by All Traffic Data in June 2017. Figure 3 illustrates the 2017 existing AM and PM peak hour traffic volumes at the study intersection. The detailed peak hour turning movement count sheets are provided in Appendix A. Public Transportation Services Public transportation in the project vicinity is served by King County Metro Transit. The Renton Bible Church Park & Ride lot located at 973 Union Ave NE is approximately 1 mile south of the project site. The existing park & ride lot includes 50 parking stalls and provides access to King County Metro Transit routes 105 and 114. Transit routes 105 and 114 provide service to downtown Renton and downtown Seattle. Transportation Impact Analysis Forest Terrace Preliminary Plat TENW December 14, 2017 Page 6 Figure 3 Year 2017 Existing Peak Hour Traffic Volumes Transportation Impact Analysis Forest Terrace Preliminary Plat TENW December 14, 2017 Page 7 Level of Service Level of service (LOS) analyses were conducted at the Union Ave NE/NE 27th Place study intersection. LOS generally refers to the degree of congestion on a roadway or intersection. It is a measure of vehicle operating speed, travel time, travel delays, and driving comfort. A letter scale from A to F generally describes intersection LOS. At signalized intersections, LOS A represents free-flow conditions (motorists experience little or no delays), and LOS F represents forced-flow conditions where motorists experience an average delay in excess of 80 seconds per vehicle. The LOS reported at stop-controlled intersections is based on the average control delay and can be reported for each controlled minor approach, controlled minor lane group, and controlled major- street movement (and for the overall intersection at all-way stop controlled intersections. Additional v/c ratio criteria apply to lane group or movement LOS only). Table 2 outlines the current HCM 6th Edition LOS criteria for signalized and stop-controlled intersections based on these methodologies. Table 2 LOS Criteria for Signalized and Stop-Controlled Intersections1 SIGNALIZED INTERSECTIONS STOP-CONTROLLED INTERSECTIONS LOS by Volume-to Capacity (V/C) Ratio2 LOS by Volume-to Capacity (V/C) Ratio3 Control Delay (sec/veh) £ 1.0 > 1.0 Control Delay (sec/veh) £ 1.0 > 1.0 £ 10 A F £ 10 A F > 10 to £ 20 B F > 10 to £ 15 B F > 20 to £ 35 C F > 15 to £ 25 C F > 35 to £ 55 D F > 25 to £ 35 D F > 55 to £ 80 E F > 35 to £ 50 E F > 80 F F > 50 F F 1 Source: Highway Capacity Manual (6th Edition), Transportation Research Board, 2016. 2 For approach-based and intersection-wide assessments at signals, LOS is defined solely by control delay. 3 For two-way stop controlled intersections, the LOS criteria apply to each lane on a given approach and to each approach on the minor street. LOS is not calculated for major-street approaches or for the intersection as a whole at two-way stop controlled intersections. For approach-based and intersection-wide assessments at all-way stop controlled intersections, LOS is solely defined by control delay. Level of service calculations for intersections were based on methodology and procedures outlined in the latest Highway Capacity Manual (6th Edition) using Synchro 10.1 traffic analysis software. The 2017 existing AM and PM peak hour LOS analysis results for the Union Ave NE / NE 27th Place study intersection are summarized in Table 3. The 2017 existing LOS worksheets are included in Appendix B. Transportation Impact Analysis Forest Terrace Preliminary Plat TENW December 14, 2017 Page 8 Table 3 2017 Existing Peak Hour LOS Summary Time Period / Study Intersection LOS Delay (sec) AM Peak Hour 1. Union Ave NE / NE 27th Place Westbound Shared Left- Right B 10.3 Southbound Left-Turn A 0.0 PM Peak Hour 1. Union Ave NE / NE 27th Place Westbound Shared Left- Right A 9.9 Southbound Left-Turn A 7.5 As shown in Table 3, the controlled movements at the study intersection currently operate at LOS B or better. Collision History Historic collisions at the study intersections were analyzed for the three-year period from 2014 to 2016. Collision data was provided by WSDOT. Summaries of the total and yearly average collisions during this period are provided in Table 4. Table 4 Collision Data Summary, January 1, 2014 to December 31, 2016 Location 2014 2015 2016 Three-Year Total Collisions Average Annual Collisions Intersection Union Ave NE / NE 27th Place 0 0 0 0 0.00 Segment Union Ave NE between SE 95th Way and NE 25th Pl 2 0 0 2 0.67 Source: WSDOT Collision Records. Transportation Impact Analysis Forest Terrace Preliminary Plat TENW December 14, 2017 Page 9 FUTURE TRAFFIC CONDITIONS Planned Transportation Improvements This section documents the known planned transportation improvements in the study area. There is one planned transportation improvement project identified in the City of RentonÊs adopted 2018- 2023 Transportation Improvement Program (TIP) in the project vicinity. • TIP #15 NE Sunset Boulevard (SR 900) Corridor Improvements Description: This project will seek to address pedestrian, transit and bicycle needs. This corridor needs a series of key improvements to improve traffic operations such as channelization, traffic signal modifications, signal treatments, possible queue jumps, access management through installation of medians. The corridor limits are from I-405 on the west and to the east City limits. Total project cost is $33,125,833. Transportation Impact Analysis Forest Terrace Preliminary Plat TENW December 14, 2017 Page 10 Project Trip Generation The weekday daily, AM and PM peak hour trip generation estimates for the existing and future single- family homes were based on trip rates published in the Institute of Transportation Engineers (ITE) Trip Generation manual, 10th edition. The resulting weekday daily, AM and PM peak hour trips are summarized in Table 5. Table 5 Trip Generation Summary Net New Trips Generated Weekday Time Period In Out Total Weekday Daily 141 140 281 Weekday AM Peak Hour 6 16 22 Weekday PM Peak Hour 16 10 26 As shown in Table 5, the proposed project is estimated to generate 281 net new weekday daily trips, with 22 net new trips occurring during the weekday AM peak hour (6 entering, 16 exiting), and 26 net new trips occurring during the weekday PM peak hour (16 entering, 10 exiting). Detailed trip generation calculations are included in Attachment C. Project Trip Distribution and Assignment The distribution and assignment of the net new AM and PM peak hour project trips were estimated based existing travel patterns, and confirmed by City of Renton staff as part of the Traffic Scoping for the project. The following Table 6 summarizes the resulting general trip distribution patterns. Table 6 Project Trip Distribution Route (Direction) Trip Distribution Union Ave NE (north) 25% Union Ave NE (south) 75% TOTAL 100% The project trip distribution and assignment through the study intersection is shown in Figure 4. Future Traffic Volumes Year 2021 No Action (without project) peak hour traffic volumes were estimated by applying a 2 percent annual background growth rate to the existing volumes (confirmed by City as part of Traffic Scoping). No pipeline projects were identified by the City of Renton, King County, or the City of Newcastle in the project vicinity. The resulting future 2021 No Action AM and PM peak hour traffic volumes are shown in Figure 5. The 2021 With-Project traffic volumes were determined by adding the trip assignment from the proposed development (shown in Figure 4) to the future 2021 No Action traffic volumes. The resulting 2021 With-Project AM and PM peak hour traffic volumes at the study intersection are shown in Figure 6. Transportation Impact Analysis Forest Terrace Preliminary Plat TENW December 14, 2017 Page 11 Figure 4 Project Trip Distribution & Assignment Transportation Impact Analysis Forest Terrace Preliminary Plat TENW December 14, 2017 Page 12 Figure 5 2021 No Action Peak Hour Traffic Volumes Transportation Impact Analysis Forest Terrace Preliminary Plat TENW December 14, 2017 Page 13 Figure 6 2021 With-Project Peak Hour Traffic Volumes Transportation Impact Analysis Forest Terrace Preliminary Plat TENW December 14, 2017 Page 14 Future Level of Service Future year 2021 Level of Service (LOS) analyses were conducted at the Union Ave NE / NE 27th Place study intersection for year 2021 weekday AM and PM peak hour No Action (without project) conditions and for year 2021 With-Project conditions. The future 2021 with-Project conditions at the Union Ave NE/NE 27th Street intersection includes a west leg to the intersection which would provide access to the site. The 2021 weekday AM and PM peak hour LOS results at the study intersections without and with the proposed project are summarized in Table 7. The LOS worksheets are included in Appendix C. Table 7 Year 2021 Peak Hour Level of Service Summary 2021 No Action 2021 With-Project Time Period / Study Intersection (movement)LOS Delay (sec) LOS Delay (sec) AM Peak Hour 1. Union Ave NE / NE 27th Place Northbound Left-Turn - - A 7.3 Eastbound Shared Left-Thru-Right - - A 9.2 Westbound Shared Left-Thru-Right B 10.5 B 11.1 Southbound Left-Turn A 0.0 A 0.0 PM Peak Hour 1. Union Ave NE / NE 27th Place Northbound Left-Turn - - A 7.7 Eastbound Shared Left-Thru-Right - - A 9.9 Westbound Shared Left-Thru-Right B 10.0 B 10.4 Southbound Left-Turn A 7.5 A 7.5 1. Results based on HCM Methodologies (6th Edition). As shown in Table 7, the controlled movements at the study intersection are expected to operate at acceptable levels (LOS B or better) in the future with the project during the weekday AM and PM peak hours. MITIGATION Off-Site Improvements. Based on the results of the LOS analysis shown in this report, no project- specific off-site transportation mitigation is proposed. Transportation Impact Fees. To mitigate long-term traffic impacts, the City of Renton requires payment of a traffic impact fee. The CityÊs currently adopted 2017 impact fee rate is $5,430.85 per single family house. Based on the current proposed lot count and credit for the existing home to removed, the net transportation impact fee for the proposed project would be $130,340.40. The CityÊs transportation impact fee rate is subject to change. Transportation Impact Analysis Forest Terrace Preliminary Plat Appendix A Peak Hour Turning Movement Counts Transportation Impact Analysis Forest Terrace Preliminary Plat Appendix B Level of Service (LOS) Calculations Transportation Impact Analysis Forest Terrace Preliminary Plat 2017 Existing Lanes, Volumes, Timings 1: Union Ave NE & NE 27th Place 12/14/2017 Forest Terrace Preliminary Plat Synchro 10 Report 2017 Existing - AM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 5 0 247 1 0 38 Future Volume (vph) 5 0 247 1 0 38 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Grade (%) 0% -11% 11% Link Speed (mph) 25 30 30 Link Distance (ft) 262 298 294 Travel Time (s) 7.1 6.8 6.7 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%) 0% 0% 4% 4% 0% 0% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 1: Union Ave NE & NE 27th Place 12/14/2017 Forest Terrace Preliminary Plat Synchro 10 Report 2017 Existing - AM Peak Hour Intersection Int Delay, s/veh 0.2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 5 0 247 1 0 38 Future Vol, veh/h 5 0 247 1 0 38 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - -11 - - 11 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 0 4 4 0 0 Mvmt Flow 5 0 268 1 0 41 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 310 269 0 0 269 0 Stage 1 269 - - - - - Stage 2 41 - - - - - Critical Hdwy 6.4 6.2 - - 4.1 - Critical Hdwy Stg 1 5.4 - - - - - Critical Hdwy Stg 2 5.4 - - - - - Follow-up Hdwy 3.5 3.3 - - 2.2 - Pot Cap-1 Maneuver 687 775 - - 1306 - Stage 1 781 - - - - - Stage 2 987 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 687 775 - - 1306 - Mov Cap-2 Maneuver 687 - - - - - Stage 1 781 - - - - - Stage 2 987 - - - - - Approach WB NB SB HCM Control Delay, s 10.3 0 0 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 687 1306 - HCM Lane V/C Ratio - - 0.008 - - HCM Control Delay (s) - - 10.3 0 - HCM Lane LOS - - B A - HCM 95th %tile Q(veh) - - 0 0 - Lanes, Volumes, Timings 1: Union Ave NE & NE 27th Place 12/14/2017 Forest Terrace Preliminary Plat Synchro 10 Report 2017 Existing - PM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 1 2 123 7 5 197 Future Volume (vph) 1 2 123 7 5 197 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Grade (%) 0% -11% 11% Link Speed (mph) 25 30 30 Link Distance (ft) 262 298 294 Travel Time (s) 7.1 6.8 6.7 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 33% 33% 1% 1% 1% 1% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 1: Union Ave NE & NE 27th Place 12/14/2017 Forest Terrace Preliminary Plat Synchro 10 Report 2017 Existing - PM Peak Hour Intersection Int Delay, s/veh 0.2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 1 2 123 7 5 197 Future Vol, veh/h 1 2 123 7 5 197 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - -11 - - 11 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 33 33 1 1 1 1 Mvmt Flow 1 2 129 7 5 207 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 350 133 0 0 136 0 Stage 1 133 - - - - - Stage 2 217 - - - - - Critical Hdwy 6.73 6.53 - - 4.11 - Critical Hdwy Stg 1 5.73 - - - - - Critical Hdwy Stg 2 5.73 - - - - - Follow-up Hdwy 3.797 3.597 - - 2.209 - Pot Cap-1 Maneuver 589 840 - - 1454 - Stage 1 822 - - - - - Stage 2 751 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 587 840 - - 1454 - Mov Cap-2 Maneuver 587 - - - - - Stage 1 819 - - - - - Stage 2 751 - - - - - Approach WB NB SB HCM Control Delay, s 9.9 0 0.2 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 734 1454 - HCM Lane V/C Ratio - - 0.004 0.004 - HCM Control Delay (s) - - 9.9 7.5 0 HCM Lane LOS - - A A A HCM 95th %tile Q(veh) - - 0 0 - Transportation Impact Analysis Forest Terrace Preliminary Plat 2021 No Action Lanes, Volumes, Timings 1: Union Ave NE & NE 27th Place 12/14/2017 Forest Terrace Preliminary Plat Synchro 10 Report 2021 Baseline - AM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 5 0 267 1 0 41 Future Volume (vph) 5 0 267 1 0 41 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Grade (%) 0% -11% 11% Link Speed (mph) 25 30 30 Link Distance (ft) 262 298 294 Travel Time (s) 7.1 6.8 6.7 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%) 0% 0% 4% 4% 0% 0% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 1: Union Ave NE & NE 27th Place 12/14/2017 Forest Terrace Preliminary Plat Synchro 10 Report 2021 Baseline - AM Peak Hour Intersection Int Delay, s/veh 0.2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 5 0 267 1 0 41 Future Vol, veh/h 5 0 267 1 0 41 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - -11 - - 11 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 0 4 4 0 0 Mvmt Flow 5 0 290 1 0 45 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 336 291 0 0 291 0 Stage 1 291 - - - - - Stage 2 45 - - - - - Critical Hdwy 6.4 6.2 - - 4.1 - Critical Hdwy Stg 1 5.4 - - - - - Critical Hdwy Stg 2 5.4 - - - - - Follow-up Hdwy 3.5 3.3 - - 2.2 - Pot Cap-1 Maneuver 663 753 - - 1282 - Stage 1 763 - - - - - Stage 2 983 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 663 753 - - 1282 - Mov Cap-2 Maneuver 663 - - - - - Stage 1 763 - - - - - Stage 2 983 - - - - - Approach WB NB SB HCM Control Delay, s 10.5 0 0 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 663 1282 - HCM Lane V/C Ratio - - 0.008 - - HCM Control Delay (s) - - 10.5 0 - HCM Lane LOS - - B A - HCM 95th %tile Q(veh) - - 0 0 - Lanes, Volumes, Timings 1: Union Ave NE & NE 27th Place 12/14/2017 Forest Terrace Preliminary Plat Synchro 10 Report 2021 Baseline - PM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 1 2 133 8 5 213 Future Volume (vph) 1 2 133 8 5 213 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Grade (%) 0% -11% 11% Link Speed (mph) 25 30 30 Link Distance (ft) 262 298 294 Travel Time (s) 7.1 6.8 6.7 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 33% 33% 1% 1% 1% 1% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 1: Union Ave NE & NE 27th Place 12/14/2017 Forest Terrace Preliminary Plat Synchro 10 Report 2021 Baseline - PM Peak Hour Intersection Int Delay, s/veh 0.2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 1 2 133 8 5 213 Future Vol, veh/h 1 2 133 8 5 213 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - -11 - - 11 Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 33 33 1 1 1 1 Mvmt Flow 1 2 140 8 5 224 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 378 144 0 0 148 0 Stage 1 144 - - - - - Stage 2 234 - - - - - Critical Hdwy 6.73 6.53 - - 4.11 - Critical Hdwy Stg 1 5.73 - - - - - Critical Hdwy Stg 2 5.73 - - - - - Follow-up Hdwy 3.797 3.597 - - 2.209 - Pot Cap-1 Maneuver 567 828 - - 1440 - Stage 1 813 - - - - - Stage 2 737 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 565 828 - - 1440 - Mov Cap-2 Maneuver 565 - - - - - Stage 1 810 - - - - - Stage 2 737 - - - - - Approach WB NB SB HCM Control Delay, s 10 0 0.2 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 717 1440 - HCM Lane V/C Ratio - - 0.004 0.004 - HCM Control Delay (s) - - 10 7.5 0 HCM Lane LOS - - B A A HCM 95th %tile Q(veh) - - 0 0 - Transportation Impact Analysis Forest Terrace Preliminary Plat 2021 With-Project Lanes, Volumes, Timings 1: Union Ave NE & Site Access/NE 27th Place 12/14/2017 Forest Terrace Preliminary Plat Synchro 10 Report 2021 With-Project - AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 4 0 12 5 0 0 5 267 1 0 41 1 Future Volume (vph) 4 0 12 5 0 0 5 267 1 0 41 1 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 0% 0% -11% 11% Link Speed (mph) 25 25 30 30 Link Distance (ft) 234 262 298 294 Travel Time (s) 6.4 7.1 6.8 6.7 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%) 2% 2% 2% 0% 0% 0% 4% 4% 4% 0% 0% 0% Shared Lane Traffic (%) Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 1: Union Ave NE & Site Access/NE 27th Place 12/14/2017 Forest Terrace Preliminary Plat Synchro 10 Report 2021 With-Project - AM Peak Hour Intersection Int Delay, s/veh 0.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 0 12 5 0 0 5 267 1 0 41 1 Future Vol, veh/h 4 0 12 5 0 0 5 267 1 0 41 1 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - -11 - - 11 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 0 0 0 4 4 4 0 0 0 Mvmt Flow 4 0 13 5 0 0 5 290 1 0 45 1 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 347 347 46 353 347 291 46 0 0 291 0 0 Stage 1 46 46 - 301 301 - - - - - - - Stage 2 301 301 - 52 46 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.1 6.5 6.2 4.14 - - 4.1 - - Critical Hdwy Stg 1 6.12 5.52 - 6.1 5.5 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.1 5.5 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.5 4 3.3 2.236 - - 2.2 - - Pot Cap-1 Maneuver 607 576 1023 606 580 753 1549 - - 1282 - - Stage 1 968 857 - 712 669 - - - - - - - Stage 2 708 665 - 966 861 - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 605 574 1023 596 578 753 1549 - - 1282 - - Mov Cap-2 Maneuver 605 574 - 596 578 - - - - - - - Stage 1 964 857 - 709 666 - - - - - - - Stage 2 705 662 - 954 861 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 9.2 11.1 0.1 0 HCM LOS A B Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1549 - - 872 596 1282 - - HCM Lane V/C Ratio 0.004 - - 0.02 0.009 - - - HCM Control Delay (s) 7.3 0 - 9.2 11.1 0 - - HCM Lane LOS A A - A B A - - HCM 95th %tile Q(veh) 0 - - 0.1 0 0 - - Lanes, Volumes, Timings 1: Union Ave NE & Site Access/NE 27th Place 12/14/2017 Forest Terrace Preliminary Plat Synchro 10 Report 2021 With-Project - PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 2 0 8 1 0 2 12 133 8 5 213 4 Future Volume (vph) 2 0 8 1 0 2 12 133 8 5 213 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 0% 0% -11% 11% Link Speed (mph) 25 25 30 30 Link Distance (ft) 250 262 298 294 Travel Time (s) 6.8 7.1 6.8 6.7 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 2% 2% 2% 33% 33% 33% 1% 1% 1% 1% 1% 1% Shared Lane Traffic (%) Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 1: Union Ave NE & Site Access/NE 27th Place 12/14/2017 Forest Terrace Preliminary Plat Synchro 10 Report 2021 With-Project - PM Peak Hour Intersection Int Delay, s/veh 0.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 2 0 8 1 0 2 12 133 8 5 213 4 Future Vol, veh/h 2 0 8 1 0 2 12 133 8 5 213 4 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - -11 - - 11 - Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 33 33 33 1 1 1 1 1 1 Mvmt Flow 2 0 8 1 0 2 13 140 8 5 224 4 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 407 410 226 410 408 144 228 0 0 148 0 0 Stage 1 236 236 - 170 170 - - - - - - - Stage 2 171 174 - 240 238 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.43 6.83 6.53 4.11 - - 4.11 - - Critical Hdwy Stg 1 6.12 5.52 - 6.43 5.83 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.43 5.83 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.797 4.297 3.597 2.209 - - 2.209 - - Pot Cap-1 Maneuver 555 531 813 501 488 828 1346 - - 1440 - - Stage 1 767 710 - 764 703 - - - - - - - Stage 2 831 755 - 699 655 - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 547 523 813 490 481 828 1346 - - 1440 - - Mov Cap-2 Maneuver 547 523 - 490 481 - - - - - - - Stage 1 759 707 - 756 695 - - - - - - - Stage 2 820 747 - 689 652 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 9.9 10.4 0.6 0.2 HCM LOS A B Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1346 - - 741 673 1440 - - HCM Lane V/C Ratio 0.009 - - 0.014 0.005 0.004 - - HCM Control Delay (s) 7.7 0 - 9.9 10.4 7.5 0 - HCM Lane LOS A A - A B A A - HCM 95th %tile Q(veh) 0 - - 0 0 0 - - Transportation Impact Analysis Forest Terrace Preliminary Plat Appendix C Trip Generation Calculations ITE Trip Rate Land Use Units LUC 1 In Out Total In Out Total Weekday Daily Proposed Use Single-Family 25 Dwelling Units 210 50%50%Equation 145 145 290 Less Existing Use Single-Family 1 Dwelling Units 210 50%50%9.44 -4 -5 -9 Total Net New Weekday Daily Trips Generated = 141 140 281 Weekday AM Peak Hour Proposed Use Single-Family 25 Dwelling Units 210 25%75%Equation 6 17 23 Less Existing Use Single-Family 1 Dwelling Units 210 25%75%0.74 0 -1 -1 Total Net New AM Peak Hour Trips Generated = 6 16 22 Weekday PM Peak Hour Proposed Use Single-Family 25 Dwelling Units 210 63%37%Equation 17 10 27 Less Existing Use Single-Family 1 Dwelling Units 210 63%37%0.99 -1 0 -1 Total Net New PM Peak Hour Trips Generated = 16 10 26 Note: 1 Institute of Transportation Engineers, Trip Generation Manual, 10th Edition, 2017 Land Use Code. Directional Split Trips Generated