HomeMy WebLinkAboutSC_Submittal_Requirements_CUP_LDC_171227_v1VERIZON SEA LOGAN AVE 12/22/17 Submittal Requirement - Conditional Use Permit # 1 Pre Application Meeting N/A # 2 Waiver Form Attached # 3 Master Application Form Attached # 4 Fees To be paid by CC # 5 Project Narrative Response #1 Verizon is filing the attached Master Use Application for Conditional Use Permit (CUP) regarding the Verizon wireless proposal at 231 Burnett Ave N. on property owned by the Pacific Northwest Regional Council of Carpenters (Carpenters Union) referenced as Verizon site SEA Logan Ave. Verizon proposes a raw land Wireless Communications Facility (WCF) to a tower height of 60’. There are 6 panel antennas and 1 microwave dish proposed, 6 Remote Radio Units (RRUs) and 1 OVP box (surge protector) proposed on the tower. Hybrid cables are proposed to run inside the tower to the antennas from the equipment cabinets. The proposed “monopine” structure will have branches and needles that will camouflage the antennas with textured exterior of the tower to replicate tree bark appearance. The antennas and ancillary tower equipment will be painted a dark color to be non-reflective and to be integrated into the structure. The use of short standoffs will keep antennas closer to the tower than traditional standoffs. The proposed cabinets at the base of the structure are for housing of electronic equipment associated with the WCF. In addition, there are other equipment cabinets proposed for back up batteries and a small diesel emergency backup power generator, all inside the WCF fenced compound approximately 15’ x 20’ in size. An 8’ tall chain link fence with opaque screening is proposed for security of the facility and to screen the base of the tower and ground equipment. (See Plans) Response #2 Per Pre-Application meetings and scoping with City of Renton staff, the proposal will require a CUP, Building Permit, and Electrical Permit for the project. Response # 3 The subject property is zoned Urban Center (UC)  The property to the North is zoned UC.  The property to the West is zoned UC.  The property to the South is zoned R 10.  The properties to the East are zoned R 6. RECEIVED 12/29/2017 amorganroth PLANNING DIVISION Response #4 The use of the subject property if a Union Hall used for office & administrative, training and meeting purposes for union members. Response #5 There are no identified special site features in commercially zoned property. Response #6 The site is flat, used mostly for parking and office buildings, and is not subject to drainage issues as a built environment in a commercial zone. Response #7 The site is not subject to plat, subdivision, or lot adjustment of record. Response #8 The project does not include or require any off-site improvements or change to public improvements on the property or adjacent properties. Response #9 The current Project valuation is estimated at $ 46,000.00. Response # 10 The project excavation envelope for the proposed tower and associated compound is approximately 300 square feet with an estimated depth of 1 foot for the construction of concrete slabs for anchorage of ground based equipment. Proposed excavation of a drilled pier foundation for the tower is estimated at 6’ x 6’ by 20’ depth. As a result, estimated excavation volumes are: 11 cy for clearing. and 25 Cy for excavation of tower foundation for a total project estimated volume of 36 CY. The fill is predominately concrete with rebar for the tower foundation and concrete slabs and approximately 5-6 cy in gravel. Response # 11 No trees will be removed or affected. Response # 12 No lands are proposed or required to be dedicated to the City. Response # 13 No proposed job shacks, sales trailers, and or model homes are proposed or required. Response # 14 Verizon proposes a reduction in tower setbacks and has requested a letter from a 3rd party Professional Engineer regarding the request. Responses # 15 & 16 The site is not within 100’ of stream or wetland or within 200’ of Cedar River. # 6 Environmental Checklist SEPA Exempt # 7 CUP Justification Waived # 8 Density Worksheet Waived # 9 Construction Mitigation Description Response # 1 Forecast for proposed construction is June 2018. Response # 2 Verizon proposed work days of Mon-Friday; work hours 7am – 5pm. Response # 3 Verizon proses ingress and egress to site from Burnett Ave to 3rd Street. Likely haul route includes transport to Sunset Blvd then to I-405 or Hwy 169. Response # 4 Best Construction Practices to be used including Temporary Erosion and Sediment Control measures and immediate haul out of excavated materials. Response # 5 The need for a Traffic Control Plan is not anticipated. Response #6 A small crane will be needed for construction of tower, and installation of tower equipment. The selected contractor will contact the City’s Airport Manager as required by the City. # 10 Title Report Attached and noted on Survey Plan Sheet C1 # 11 Draft Legal Documents N/A # 12 Neighborhood Detail Map See Plans # 13 Affidavit of Sign Posting Attached # 14 Site Plan See Plans # 15 Architectural Elevations See Plans # 16 Landscape Plan Waived # 17 Floor Plans N/A # 18 Topography Map See Plans Survey Sheet C1 # 19 Tree Retention Plan N/A No Trees of vegetation to be removed or impacted # 20 Tree Retention Worksheet N/A No Trees of vegetation to be removed or impacted # 21 Arborist Report N/A No Trees of vegetation to be removed or impacted # 22 – 27 Waived # 28 Letter – Geologic Risk N/A, however a Geotechnical Study will be obtained for tower and foundation engineering design. # 29 – 34 Waived Please see cover letter and attachments for Wireless materials.