HomeMy WebLinkAboutC_Water_Availabilty_Certificate_180111_v1OKing County
DDES
DEPARTMENT OF DEVELOPMENT AND
ENVIRONMENTAL SERVICES
900 Oakesdale Avenue Southwest
Renton, Wa 98055-1219
This certificate provides the Seattle King
County Department of Public Health and
the Department of Development and
Environmental Services with information
necessary to evaluate development
proposals.
King County Certificate of Water Availability
Do not write in this box
number name
❑ Building Permit
❑ Short Subdivision
0 Preliminary Plat or PUD
❑ Rezone or other
Applicant's name: Norman and Cynthia Green (Contact Dale Lydin @ 206-431-7970)
Proposed use: Single Family Residences — 7 Lots (Green's Landing)
Location: 5008 Hoquiam Avenue NE, Renton WA 98059
attach map and legal description if necessary)
Water purveyor information:
1. ❑ a. Water will be provided by service connection only to an existing (8") water main that is fronting the site.
OR/AND
0 b. Water service will require an improvement to the water system of:
❑ (1) feet of water main to reach the site; and/or
0 (2) The construction of a distribution system on the site; and/or
El (3) Other (describe) See below.
2. 0 a. The water system is in conformance with a County approved water comprehensive plan.
OR
❑ b. The water system improvement is not in conformance with a County approved water comprehensive
plan and will require a water comprehensive plan amendment. (This may cause a delay in issuance of a permit or
approval).
O a. The proposed project is within the corporate limits of the district, or has been granted Boundary Review Board
approval for extension of service outside the district or city, or is within the County approved service area of a
private water purveyor.
OR
❑ b. Annexation or Boundary Review Board (BRB) approval will be necessary to provide service.
4. 0 a. Water will be available at the rate of flow and duration indicated below at no less than 20 psi measured at the
nearest fire hydrants within 300 feet from all buildings/property (or as marked on the attached map):
Rate of flow at Peak Demand
Duration
❑
less than 500 gpm (approx. gpm)
❑
less than 1 hour
❑
500 to 999 gpm
❑
1 hour to 2 hours
❑
1000 gpm or more
El
2 hours or more
❑
flow test of gpm
❑
other
El
calculation of 1,000 gpm
(Note: Commercial building permits which includes multifamily structures require flow test or
calculation.)
❑ b. Water system isnot capable of providing fire flow.
O a. Water system has certificates of water right or water right claims sufficient to provide service.
OR
❑ b. Water system does not currently have necessary water rights or water right claims.
Comments/conditions: WAC @ $300.00 = initial deposit. Fees per lot: WAC @ $125, GFC @ $5500, SPUFC @ $936, 5/8
Meter Drop @ $500 = Fees per lot: $7,061.00 + Developer Extension Costs. FEES SUBJECT TO CHANGE WITHOUT PRIOR
NOTICE. Paving plus 20% to be billed separately where applicable.
Provide developer extension agreement for onsite and future looping, and replacement of approximately 120 linear
feet of 6" AC water main with 8" ductile iron water main on SE 132nd Street frontage.
I certify that the above water purveyor information is true. This certification shall be valid for 1 year from date of signature.
KING COUNTY WATER DISTRICT #90 Darcey Peterson RENEWAL FEES: W/ IN 1 YEAR $50.00
Agency name Signatory name AFTER 1 YEAR $125.00
District Manager/
Title Signatu Date
C:\Users\donal\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\220MUX3T\Greens Landing DE WAC.doc