HomeMy WebLinkAboutPRE-APP_Meeting SummaryDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
|www.rentonwa.gov
PREAPPLICATION MEETING FOR
King County South Treatment Plant Gate Upgrades
1200 Monster Rd SW, Renton, WA 98057
PRE 24-000201
August 1, 2024
Contact Information:
Planner: Jill Ding, 425-430-6598, jding@rentonwa.gov
Public Works Plan Reviewer: Sam Morman, 425-430-7383, smorman@rentonwa.gov
Fire Prevention Reviewer: Corey Thomas, 425.276.9582, cthomas@RentonRFA.org
Building Department Reviewer: Rob Shuey, 206.550.8523, rshuey@rentonwa.gov
Please retain this packet throughout the course of your project as a reference. Consider
giving copies to engineers, architects, and contractors who will work on the project. You will
need to submit an PDF copy of this packet when you apply for land use and/or
environmental permits.
When the project application is ready for submittal, you may email the project planner to
start the prescreen process. Similarly, you may contact the assigned planner if there are any
questions regarding submittal requirements.
The pre-application meeting is informal and non-binding. The comments provided on the
proposal are based on the codes and policies in effect at the time of review. The applicant is
cautioned that the development regulations are regularly amended and the proposal will be
formally reviewed under the regulations in effect at the time of project submittal. The
information contained in this summary is subject to modification and/or concurrence by
official decision-makers (e.g., Hearing Examiner, Planning Director, Development Services
Director, Development Engineering Director, Department of Community & Economic
Development Administrator, Public Works Administrator and City Council).
M E M O R A N D U M
DATE: July 19, 2024
TO: Jill Ding, Senior Planner
FROM: Corey Thomas, Lead Plans Review Inspector
SUBJECT: King County Metro Access Gates
1. Fire department apparatus access roadways are required to be a minimum of 20 feet
wide fully paved, with 25-feet inside and 45-feet outside turning radius. Fire access roadways
shall be constructed to support a 30-ton vehicle with 75-psi point loading. All changes to fire
access gates shall meet department minimums. Approved Click2Enter devices shall be added to
all fire access gates. See attached gate standard for detail. Subject to plan review and
permitting.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: August 1, 2024
TO: Jill Ding, Senior Planner
FROM: Sam Morman, Civil Engineer II
SUBJECT: King County South Treatment Plant Gate
1200 Monster Rd SW
PRE24-000201
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-
binding and may be subject to modification and/or concurrence by official City decision-makers. Review
comments may also need to be revised based on site planning and other design changes required by
City staff or made by the applicant.
I have completed a preliminary review for the above-referenced proposal located at parcel(s)
2423049006. The following comments are based on the pre-application submittal made to the City of
Renton by the applicant.
Water
1. Based on the submittal items and project description, there are not anticipated to be additional
water requirements associated with this scope of work.
Sewer
2. Based on the submittal items and project description, there are not anticipated to be additional
sewer requirements associated with this scope of work.
Surface Water
1. There is a 12-inch gravity surface water main in Oakesdale Ave SW (see record R-199805).
2. There is a 12-inch surface water main in Monster Rd SW (see record drawing R-281609).
3. On-site critical areas that may impact surface water review are on-site wetlands, regulated
shorelines, regulated slopes, landslide hazard area, FEMA 100-year flood plain.
4. Any new on or off-site drainage systems must be designed in accordance with Chapter 4 of the 2022
RSWDM.
5. Drainage plans and a drainage report complying with the adopted 2022 Renton Surface Water Design
Manual will be required. Refer to Figure 1.1.2.A – Flow Chart of the 2022 Renton Surface Water Design
Manual (RSWDM) to determine what type of drainage review is required for this site. The site falls
within the City’s Peak Rate Flow Control (Matching Existing) Standard. The site falls within the Black
River drainage basin and Springbrook Creek sub basin.
6. The current Surface Water Standard Plans shall be used in all drainage plan submittals. The current
City of Renton Standard Details are available online in the City of Renton website
https://edocs.rentonwa.gov/Documents/Browse.aspx?id=990403&dbid=0&repo=CityofRenton
7. If the new plus replaced pollution generating impervious surface exceeds 5,000 SF, the applicant will
be required to provide enhanced basic water quality treatment. Any proposed detention and/or water
quality vault shall be designed in accordance with the RSWDM that is current at the time of civil
construction permit application. Separate structural plans will be required to be submitted for review
and approval under a separate building permit for the detention and/or water quality vault.
8. Appropriate on-site BMPs satisfying Core Requirement #9 will be required to help mitigate the new
runoff created by this development to the maximum extent feasible. On-site BMPs shall be evaluated
as described in Section C.1.3 of the 2022 RSWDM. A preliminary drainage plan, including the
application of on-site BMPs, shall be included with the land use application, as applicable to the
project. The final drainage plan and drainage report must be submitted with the utility construction
permit application.
9. A geotechnical soils report for the site is required per the 2022 Renton Surface Water Design Manual
Section C.1.3. Information on the water table and soil permeability (measured infiltration rates), with
recommendations of appropriate on-site BMPs per Core Requirement #9 and Appendix C shall be
included in the report. The report should also include information concerning the soils, geology,
drainage patterns and vegetation present shall be presented in order to evaluate the drainage,
erosion control and slope stability for site development of the proposed plat. The applicant must
demonstrate the development will not result in soil erosion and sedimentation, landslide, slippage,
or excess surface water runoff.
10. Erosion control measures to meet the City requirements shall be provided.
11. The development is subject to a surface water system development charge (SDC) fees. Fees will be
charged based on the rate at the time of construction permit issuance.
• The current SDC fee is $0.92 per square foot of new impervious, but not less than $2,300.
• The full fee schedule can be found at:
https://edocs.rentonwa.gov/Documents/DocView.aspx?id=10067864&dbid=1&repo=Cityof
Renton
Transportation
3. Based on the submittal items and project description, there are not anticipated to be additional
transportation requirements associated with this scope of work.
General Comments
1. If frontage improvements are required, all existing and proposed utility lines (i.e. electrical, phone, and
cable services, etc.) along property frontage or within the site must be underground as outlined in
RMC 4-6-090 – UTILITY LINES - UNDERGROUND INSTALLATION. The construction of these franchise
utilities must be inspected and approved by a City of Renton inspector.
2. Adequate separation between utilities as well as other features shall be provided in accordance with
code requirements.
a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other utilities is
required with the exception of water lines which require 10-ft horizontal and 1.5-ft vertical.
b. The stormwater line should be minimum 5 feet away from any other structure or wall or
building.
c. Trench of any utility should not be in the zone of influence of the retaining wall or of the
building.
3. All construction utility permits for utility and street improvements will require separate plan
submittals. All utility plans shall confirm to the Renton Drafting Standards. A licensed Civil Engineer
shall prepare the civil plans. Please visit the Development Engineering Forms page for the most up-
to-date plan submittal requirements:
http://rentonwa.gov/business/default.aspx?id=42473
4. A landscaping plan shall be included with the civil plan submittal. Each plan shall be on separate sheets.
5. Fees quoted in this document reflect the fees applicable in the year 2023 only and will be assessed
based on the fee that is current at the time of the permit application or issuance, as applicable to the
permit type. Please visit www.rentonwa.gov for the current development fee schedule.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: August 1, 2024
TO: Pre-Application File No. PRE24-000201
FROM: Jill Ding, Senior Planner
SUBJECT: King County South Treatment Plant Gate Upgrades –
1200 Monster Rd SW, Renton, WA 98057
Parcel No. 2423049006
General: We have completed a preliminary review of the pre-application for the above-
referenced development proposal. The following comments on development and permitting
issues are based on the pre-application submittals made to the City of Renton by the applicant
and the codes in effect on the date of review. The applicant is cautioned that information
contained in this summary may be subject to modification and/or concurrence by official decision-
makers (e.g., Hearing Examiner, Community & Economic Development Administrator, Public
Works Administrator, Planning Director, Development Services Director, Development
Engineering Director, and City Council). Review comments may also need to be revised based on
site planning and other design changes required by City staff or made by the applicant. The
applicant is encouraged to review all applicable sections of the Renton Municipal Code. The
Development Regulations are available online at https://www.codepublishing.com/WA/Renton.
Project Proposal: The project site is located at King County’s South Treatment Plat (South Plat) in
Renton at 1200 Monster Rd SW (Parcel Nos. 242304-9006). The South Plant is a secondary
wastewater treatment facility owned and operated by King County Department of Natural
Resources and Parks (DNRP) Wastewater Treatment Division (WTD). The City of Renton issued a
Conditional Use Permit, Site Plan, Shoreline Exemption, and Street Modification for the King
County South Plant Biogas & Heating Systems Improvement Project on June 12, 2018 (Hearing
Examiner’s Final Decision on LUA18-000188). King County is preparing an alternatives analysis to
which will be used for the construction of improvements to their South Treatment Plant’s two
existing entrances. Proposed improvements will include new gate operating mechanisms, likely
new gates to meet a new fencing standard, signage, and new gate controls such as badge readers.
One of the entrances is from Monster Road SW. Alternatives for the Monster Road SW entrance
include replacing the gate in its existing location and setting the gate farther back in the site using
slide or swing gates. Setting the gate farther back would include the addition of two gates and
removal of the existing gate, a negligible widening of the site road to maintain truck access
through the new gates, addition of approximately 300 feet of new fencing, a small amount of
landscape restoration, and repaving a small portion of the site road. Sliding gates would add a
negligible amount of grading and vegetation removal to provide space for the gates to slide back,
compared with swinging gates.
King County South Treatment Plant Gate Upgrades
Page 2 of 6
August 1, 2024
The other entrance is off Oakesdale Avenue SW across from 7th Street SW. This entrance is
accessed by a bridge over Springbrook Creek. All alternatives will keep or replace the existing gate
in its existing location. The access pad may be replaced in its existing location, across the entry
road creating single lane traffic, or in the center of the access road. No landscaping will be
modified, impervious surface areas will not be changed, and a portion of existing paved surface
will be repaved.
The project site has been mapped, by City of Renton (COR) Maps, with moderate coalmine
hazards, regulated shoreline – shoreline high intensity, high seismic hazards, regulated slopes,
moderate/high landslide hazards, special flood hazard area (100 year flood) – FEMA Zone AE, and
wetlands. The project site has been mapped with moderate coalmine hazards and high seismic
hazards. Springbrook Creek is located offsite to the east.
Current Use: Currently the site is occupied by King County’s South Treatment Plat (South Plant).
1. Zoning /Land Use Designation, and Overlays: The property is located within the Employment
Area (EA) land use designation and the Heavy Industrial (IH) zoning designation. Sewage
disposal and treatment plants also require a Hearing Examiner Conditional Use Permit in
the IH zone. According to the submittal summary, the plant was previously permitted under
a Conditional Use Permit (CUP) as part of a previous site enlargement project (Metro
Treatment Plant at Renton – Enlargement III project).
2. Development Standards: The project would be subject to RMC 4-2-130A, “Development
Standards for Industrial Zoning Designations” effective at the time of complete application
(noted as “IH standards” herein).
Minimum Lot Size, Width and Depth – The minimum lot size in the IH zone is 35,000 square
feet. There are no minimum lot width or depth requirements. The existing lot totals
3,151,155 square feet in area and would exceed the minimum lot size requirements of the
IH zone.
Setbacks – Setbacks are the distance between the building and the property line or any private
access easement. The required setbacks in the IH zone are as follows: 15 feet for a front yard
or secondary front yard (20 feet from a principal arterial street); zero for the rear yard or side
yards, except 50 feet if the lot abuts a lot zoned residential. Not applicable, the proposal does
not include the construction of new structures.
Building Height – There is no maximum building height requirement within the IH zone.
Building Coverage – There are no minimum lot coverage or impervious surface coverage
requirements within the IH zone.
3. Screening: Screening must be provided for all surface-mounted and roof top utility and
mechanical equipment. The site plan application will need to include elevations and details
for the proposed methods of screening (see RMC 4-4-095).
4. Fences/Walls: The proposed project includes the installation/replacement of approximately
300 feet of fencing, the location of the new/replaced fencing must be designated on the
landscape plan or grading plan. A fence and/or wall detail should also be included on the
plan. A fence taller than 6 feet shall require a building permit or an explicit exemption from
the Building Official. A retaining wall that is 4 feet or taller, as measured by the vertical
King County South Treatment Plant Gate Upgrades
Page 3 of 6
August 1, 2024
distance from the bottom of the footing to the finish grade at the top of the wall requires a
building permit. A fence shall not be constructed on top of a retaining wall unless the total
combined height of the retaining wall and the fence does not exceed the allowed height of a
standalone fence.
The maximum height of any fence, hedge or retaining wall shall be eight feet (8'), provided
the fence, hedge, or retaining wall does not pose a traffic vision hazard. Fences, hedges, and
retaining walls shall not stand in or in front of any required landscaping. Electric fences are
permitted in all industrial zones. All electric fences shall be posted with permanent signs a
minimum of thirty six (36) square inches in area at intervals of fifteen feet (15') stating that
the fence is electrified. Electric fences and any related equipment and appliances must be
installed in accordance with the manufacturer’s specifications and in compliance with the
National Electrical Code. Barbed wire fences are permitted in all industrial zones. Barbed wire
may only be used on top of fences at least six feet (6') high. For more information about fences
and retaining walls refer to RMC 4-4-040. No elevations of the proposed gates were included
with the pre-application submittal materials, however according to the project narrative
the existing fencing has a height of six feet (6’) and the proposed fencing may be as tall as
eight feet (8’), which would comply with the commercial fencing height requirements.
Landscaping: Except for critical areas, all portions of the development area not covered by
structures, required parking, access, circulation or service areas, must be landscaped with
native, drought-resistant vegetative cover. The minimum on-site landscape width required
along street frontages is 10 feet and shall contain trees, shrubs, and landscaping. Street trees
in the ROW planter will also be required. Please refer to landscape regulations (RMC 4-4-070)
for additional general and specific landscape requirements. The proposal would be exempt
from compliance with the landscaping requirements as no new buildings are proposed.
5. Significant Tree Retention: When significant trees (greater than 6-inch caliper or 8-caliper
inches for alders and cottonwoods) are proposed to be removed, a tree inventory and a tree
retention plan along with an arborist report, tree retention plan and tree retention worksheet
shall be provided with the formal land use application as defined in RMC 4-8-120. The tree
retention plan must show preservation of at least 30% of significant trees. Please refer to RMC
4-4-130, Tree Retention and Land Clearing Regulations for further general and specific tree
retention and land clearing requirements.
In addition to retaining a minimum of 30% of existing significant trees, properties subject to
an active land development permit shall comply with minimum tree credit retention
requirements of a minimum of 30 credits per net acre. Tree credits encourage retention of
existing significant trees with larger trees being worth more tree credits.
TREE SIZE TREE CREDITS
New small species tree 0.25
New medium species tree 1
New large species tree 2
Preserved tree 6 – 9 caliper inches 4
King County South Treatment Plant Gate Upgrades
Page 4 of 6
August 1, 2024
TREE SIZE TREE CREDITS
Preserved tree 10 – 12 caliper inches 5
Preserved tree 12 – 15 caliper inches 6
Preserved tree 16 – 18 caliper inches 7
Preserved tree 19 – 21 caliper inches 8
Preserved tree 22 – 24 caliper inches 9
Preserved tree 25 – 28 caliper inches 10
Preserved tree 29 – 32 caliper inches 11
Preserved tree 33 – 36 caliper inches 12
Preserved tree 37 caliper inches and greater 13
Significant trees shall be retained in the following priority order:
Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees
on slopes greater than twenty percent (20%); significant trees adjacent to critical areas and
their associated buffers; significant trees over sixty feet (60') in height or greater than
eighteen inches (18") caliper; and trees that shelter interior trees or trees on abutting
properties from strong winds, which could otherwise allow such sheltered trees to be blown
down if removed.
Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; other
significant native evergreen or deciduous trees; and other significant non-native trees.
Priority Three: Alders and cottonwoods shall be retained when all other trees have been
evaluated for retention and are not able to be retained unless the alders and/ or cottonwoods
are used as part of an approved enhancement project within a critical area or its buffer.
The Administrator may require independent review of any land use application that involves
tree removal and land clearing at the City's discretion.
The Administrator may authorize the planting of replacement trees on the site if it can be
demonstrated to the Administrator's satisfaction that replacement requirements in RMC 4-4-
130H.1.e can be met.
Tree retention standards shall be applied to the developable area, as defined in RMC 4-11-
040, Definitions D, of a property. A formal tree retention/planting plan and tree retention
and tree credit worksheet prepared by an arborist or landscape architect would be reviewed
at the time of the land use application.
6. Parking: The following ratios would be applicable to the site:
USE NUMBER OF REQUIRED SPACES
King County South Treatment Plant Gate Upgrades
Page 5 of 6
August 1, 2024
Uses not specifically
identified in this
Section
Department of Community and Economic Development staff
shall determine which of the below uses is most similar based
upon staff experience with various uses and information
provided by the applicant. The amount of required parking for
uses not listed above shall be the same as for the most similar
use listed below.
Warehouses and indoor
storage buildings:
A minimum and maximum of 1 per 1,500 square feet of net
floor area.
It should be noted that the parking regulations specify standard stall dimensions. Surface
parking stalls must be a minimum of 9 feet x 20 feet, compact dimensions of 8½ feet x 16 feet,
and parallel stall dimensions of 9 feet x 23 feet; compact surface parking spaces shall not
account for more than 30 percent of the spaces in the surface parking lots. ADA accessible
stalls must be a minimum of 8 feet in width by 20 feet in length, with an adjacent access aisle
of 8 feet in width for van accessible spaces. The appropriate amount of ADA accessible stalls
based on the total number of spaces must be provided. Compliance with the parking
regulations would not be required, as no new buildings are proposed.
7. Access/Driveways: The primary access to the northern portion of the Plant, where the project
will be developed, is across from SW 7th Street. However, there are additional driveways
located off Monster Road SW, Longacres Dr SW, and SW Grady Way. No changes in site access
are proposed.
The maximum driveway slopes cannot exceed 15%. If the grade exceeds 15%, a variance is
required. Driveways exceeding 8% shall provide slotted drains at the lower end.
8. Critical Areas: The project site has been mapped with moderate coalmine hazards and high
seismic hazards. The applicant shall contract with a geotechnical engineer in order to verify
that the earthwork, foundation and other recommendations have been properly interpreted
and implemented in the design and engineering plan documents. Any work proposed within
fifty feet (50’) of a coal mine hazard area would be required to complete an analysis on Coal
Mine Hazards in the area pursuant to RMC 4-8-120D.7 Geotechnical Report, Coalmine-
Medium.
Springbrook Creek is located offsite to the east. Springbrook Creek is a Shoreline of the State
and is subject to the provisions of the Shoreline Management Act. Any work proposed within
200 feet of Springbrook Creek, the proposal would be required to comply with the City’s
Shoreline Master Program. Proposed improvements within the 200-foot Shoreline
Jurisdiction include the replacement of an existing access pad, the keeping or replacing of
the existing gate in its current location, and the re-pavement of existing paved surfaces. No
new impervious surfaces are proposed at this location.
In addition, a floodplain is mapped on the project site. If any development is proposed within
the floodplain, a flood hazard study and Biological Assessment would be required at the
time of formal land use application. The study would need to demonstrate that the
proposed development would be constructed one (1) foot above base floor elevation for the
1995 Flood Insurance Rate Map (1995 FIRM Map) and provide an analysis as to whether the
proposal would require compensatory storage.
King County South Treatment Plant Gate Upgrades
Page 6 of 6
August 1, 2024
Finally, the City’s COR mapping system has identified a wetland within 200-feet of the site.
This wetland could be associated with Springbrook Creek. If this wetland is associated with
Springbrook Creek it would be regulated by the Shoreline Master Program (RMC 4-3-090). All
reasonable efforts should be taken to ensure that the proposed activities do not result in net
loss of ecological functions.
If the wetland is found to be separated from Springbrook Creek, then the wetland would be
regulated by the Critical Areas Regulations. As the project is separated from the wetland via
an access road, the Critical Area Regulations may not apply to development per RMC 4-3-
050B.1.g, as determined by the Administrator. Beyond the established critical area buffer, all
structures would be required to provide a minimum 15-foot building setback.
9. Environmental Review: In accordance with WAC 197-11-800, the repair, remodeling,
maintenance, or minor alteration of existing private or public structures, facilities or
equipment, including utilities, recreation, and transportation facilities involving no material
expansions or changes in use beyond that previously existing would be exempt from
Environmental (SEPA) Review.
10. Permit Requirements: The proposal would require a Shoreline Exemption. Shoreline
Exemptions would be processed within an estimated timeframe of four (4) weeks. There is no
fee for a Shoreline Exemption. Detailed information regarding the land use application
submittal can be found on the City’s Permit Center website (www.Rentonwa.gov). The City
now requires electronic plan submittal for all applications.
In addition to the required land use permits, separate construction and building permits may
be required.
11. Waivers of Submittal Requirements: The submittal checklist is not an exhaustive list of
submittal requirements and may be modified in cases where additional information is
required to complete the review of an application. In addition, non-applicable submittal
requirements may be waived. The applicant should contact the assigned Project Manager if
there are any questions regarding submittal requirements.
12. Impact Fees: As the proposal would not include the construction of new buildings, Impact
Fees would not be required.
The city’s 2023-2024 fee schedule is available for your review on the City’s website.
13. Next Steps: When the formal application materials are complete, the applicant shall have the
materials pre-screened prior to submitting the complete application package. Please contact
Jill Ding, Senior Planner, at 425-430-6598 or jding@rentonwa.gov to submit prescreen
materials and subsequent land use application.
14. Expiration: Once the Shoreline Exemption application has been approved, the applicant has
two (2) years to commence construction activities, or a use or activity, for which a permit has
been granted pursuant to the Shoreline Master Program. However, the Planning Division may
authorize a single extension for a period not to exceed one year based on reasonable factors,
if a request for extension has been filed with the Planning Division before the expiration date,
and notice of the proposed extension is given to parties of record and the Department of
Ecology. It is the applicant’s responsibility to monitor the expiration dates.