TECHNICAL INFORMATION REPORT
for
SADDlEBROOK
Preliminary Plat
13426156'· Avenue SE Renton, Washington
DRS Project No. 12040
Renton File No.
Owner/Applicant
PNW Holdings LLC
9675 SE 36 tn Street, Suite 105
Mercer Island, WA 98040
Report Prepared by
I~I
D. R. STRONG Consulting Engineers, Inc.
10604 N.E. 38th Place, Suite 232
Kirkland WA 98033
(425) 827·3063
©2012 D. R STRONG Consulting Engineers Inc.
Report Issue Date
August 27,2012
c· fty Of Rent
Planning O ... On IVISlon
Sf!' -4 2012
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TECHNICAL INFORMATION REPORT
SADDLE BROOK
Preliminary Plat
TABLE OF CONTENTS
SECTION I ....................................................................................................................... 1
Project Overview .......................................................................................................... 1
Predeveloped Site Conditions ...................................................................................... 1
Developed Site Conditions ........................................................................................... 1
Natural Drainage System Functions ............................................................................. 2
SECTION II .................................................................................................................... 1 0
Conditions and Requirements Summary .................................................................... 10
SECTION III ................................................................................................................... 12
Off-Site Analysis ......................................................................................................... 12
SECTION IV .................................................................................................................. 13
Flow Control and Water Quality Facility Analysis and Design .................................... 13
Existing Site Hydrology (Part A) .............................................................................. 13
Pre-developed Hourly Time Step Modeling Input .................................................. 14
Pre-developed Hourly Time Step Modeling Output ................................................ 14
Developed Site Hydrology (Part B) ......................................................................... 16
Developed Site Area Hydrology .............................................................................. 16
Developed Hourly Time Step Modeling Input ......................................................... 17
Developed Hourly Time Step Modeling Output ...................................................... 17
BYPASS Hourly Time Step Modeling Input ........................................................... 18
BYPASS Hourly Time Step Modeling Output ......................................................... 18
Performance Standards (Part C) ................................................................................ 20
Flow Control System (Part D) ..................................................................................... 20
Flow Control BMP Selection ................................................................................... 20
Flow Control Facility Design Output.. ...................................................................... 22
Water Quality Treatment System (Part E) .................................................................. 29
SECTION V ................................................................................................................... 31
Conveyance System Analysis and Design ................................................................. 31
SECTION VI .................................................................................................................. 33
Special Reports and Studies ...................................................................................... 33
SECTION VII ................................................................................................................. 34
Other Permits, Variances and Adjustments ................................................................ 34
©2012 O. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat Page i of ji
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SECTION VIII ................................................................................................................ 35
ESC Plan Analysis and Design (Part A) ..................................................................... 35
SWPPS Plan Design (Part B) ..................................................................................... 36
SECTION IX .................................................................................................................. 37
Bond Quantities, Facility Summaries, and Declaration of Covenant .......................... 37
Stormwater Facility Summary Sheet .......................................................................... 38
SECTION X ................................................................................................................... 40
Operations and Maintenance Manual ....................................................................... .40
APPENDICES ............................................................................................................... 41
Appendix "A" Adjustment 2012-03 ............................................................................. 42
List of Figures
Figure 1 TIR Worksheet... ................................................................................................ 3
Figure 2 Vicinity Map ....................................................................................................... 6
Figure 3 Drainage Basins, Subbasins, and Site Characteristics ...................................... 7
Figure 4 Soils ................................................................................................................... 8
Figure 5 Predevelopment Area Map .............................................................................. 15
Figure 6 Post Development Area Map ........................................................................... 19
Figure 7 Detention & Water Quality Facility Details ....................................................... 30
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat Page ii of ii
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SECTION I
PROJECT OVERVIEW
The Project is the subdivision of two existing parcels zoned R4 (4.36 ac. total) into 14
single-family residential lots, per the City of Renton's (City) subdivision process. The
Tax Parcel Numbers are 3664500260 and 3664500261. The Project location (Site)
fronts on the east side of 156th Avenue SE (156 th ) and the west side of 158th Avenue SE
(158 th ) at 13426 156th Avenue SE. Although the Site drains in two directions, an
adjustment has been granted to combine the drainage into one detention pond
designed to Level Three Flow Control Standards (Adjustment 2012-03). The Project will
meet the drainage requirements of the 2009 King County Surface Water Oesign Manual
(Manual), as adopted by the City.
PREOEVELOPED SITE CONDITIONS
Total existing Site area is approximately 189,797 s.f. (4.36 ac). Total proposed Project
area is 200,420 s.f. (4.60 ac) which includes 10,623 s.f. (0.24 ac) for the right-of-way
frontage improvements on 156 th and 158th. The Parcels are currently developed with
two single-family residences,out buildings and a gravel driveway. The remainder of the
Site is lawn, landscaping, scattered trees and horse pasture.
The 4.36 acre parcel is situated atop a ridge and discharges runoff into two subbasins.
TOA West is approximately 1.78 acres and discharges to 156 th Avenue SE while TOA
East is comprised of the remaining 2.58 acres and discharges to 158th Avenue SE. The
discharge elevation of TOA West is approximately six feet lower than that of TOA East.
These two flowpaths converge at a point approximately 3,000 feet downstream of TOA
West and 4,900 feet downstream of TOA East at the corner of 156 th Avenue SE and SE
144 th Street.
For the purpose of hydrologic calculations, the entire Site is modeled as till forest.
DEVELOPED SITE CONDITIONS
The applicant is seeking approval to create 14 lots with lot sizes ranging from
approximately 9,400 s.f. to 11,734 s.f. All existing improvements will be demolished or
removed during plat construction. The 14 single-family residences combined with their
driveways will create approximately 61,230 s.f. (3.12 ac) of impervious area. The
proposed 53-foot right of way will be improved with 26 feet of pavement, vertical curb,
gutter, 8-foot planter strip and 5-foot sidewalk. The half street frontage improvements
on 156th will consist of 17 feet of pavement, vertical curb, gutter, 8-foot planter strip and
a 5-foot sidewalk. The half street frontage improvements on 158 th will consist of 16 feet
of pavement, vertical curb, gutter, 8-foot planter strip and a 5-foot sidewalk. The
improvements from right-of ways and private access tract will add approximately 39,130
s.f. (0.90 ac) of impervious surface. The Project will result in a total of 2.54 ac of new
impervious surfaces. The remainder of the developed Site (2.06 ac) will consist of
landscaping and lawns.
The Project has gained approval to combine runoff from TOA East with that of TOA
West and construct one drainage facility in Tract A. As a condition of this adjustment,
the Project drainage facility is required to adhere to Level 3 Flow Control Criteria.
©2012 D. R. STRONG Consulting Engineers Inc.
Technicallnfonnation Report
Saddlebrook Preliminary Plat Page 1
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
The Project has gained approval to combine runoff from TDA East with that of TDA
West and construct one drainage facility in Tract A. As a condition of this adjustment,
the Project drainage facility is required to adhere to Level 3 Flow Control Criteria.
The Project is required to provide Basic Water Quality treatment and Level 3 Flow
Control, per the 2009 KCSWDM (Manual). All surface water runoff from impervious
surfaces will be collected and conveyed to a storm detention/water quality pond located
in Tract "A.
NATURAL DRAINAGE SYSTEM FUNCTIONS
The Site topography slopes from the center of the site to the southeast and southwest.
The vegetation consists of lawn, landscaping, scattered trees and horse pasture. Site
runoff travels southeasterl~ and southwesterly and sheet flows off the site to
conveyance systems in 1561 and 158th.
A review of the SCS soils map for the area (see Figure 4, Soils) indicates Alderwood
gravelly sandy loam with 6 to 15 percent slopes (AgC). Per the Manual, this soil type is
classified as "Till" material. The SCS Soil series descriptions follow Figure 4.
In evaluating the upstream area, we reviewed King County IMAP aerial topography and.
imagery and conducted field reconnaissance and have concluded that upstream
tributary area for the Site is negligible. The upstream properties developed portions
drain in southeasterly and southwesterly directions almost directly to the respective
rights of way and the areas producing runoff that may enter the Site are densely
vegetated.
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Infonnation Report
Saddlebrook Preliminary Plat Page 2
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FIGURE 1
TIR WORKSHEET
King County Department of Development and Environmental Services
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
iPart·"1'" PRCDJECT CDWNER~AND;';'" , . ''.i 'PRCDJE(11)~NGftJ~E~"i;'.",,~,:;;:':: . "ic' ".~~rt:2~,PRO. ~sH,".O<?~TI?N.· :tt:!P:'J"-(~''';'''''''>
~:"~~"~"~" ~"1~J;:"~'nl<>L>~ _ ';' ~l ~,... :·~~~d;';'·h_. _ ~~ '~~¥. ·t~.~, _ _.kh
DESCRIPTION'''¥' . .. '" .. ~', "~i:~ ... h_~_. ,~"",f: .:,.;.....-::-':'-~' '1:'. "'.4~', ~~'~:')~"' . ./'. .~:.~
L ... __ .. ~ .• ,.'" ' __ 0.,..';' •• t.. __ .1~'_ : .... ,1; _".-:':' ."
Project Owner:
PNW Holdings LLC
Address/Phone:
9675 SE 36th Street, Suite 105
Mercer Island, WA 98040
Project Engineer:
Maher A. Joudi, P.E.
Project Name:
Piper's Bluff
Location:
Township:
Range:
Section:
23 North
05 East
14
D. R. STRONG Consulting Engineers Inc.
Address/Phone:
10604 NE 38th Place, Suite 101
Kirkland WA 98033
(425) 827-3063
Community:
Newcastle
Drainage Basin
Lower Cedar River
©2012 O. R. STRONG Consulting Engineers Inc.
Technicallnfonnation Report
:Piiif~bTI'lERRE\{IEWSAND RERMITS"', I" 'i,
~~~:+:~~ ~,~ :.<~~j::;:':.. _~~~_~"::.: ~f ~'_, ::~ :~,'~~:' _":~':'''' (: '~,~ 1:' ,.,." r+ J' :> '-~~ .~.
[J DFW HPA
Management
0 COE404
0 DOE Dam Safety
0 FEMA Floodplain
0 COE Wetlands
Saddlebrook Preliminary Plat
0
0
0
0
Shoreline
Rockery
Structural Vault
Other:
Page 3
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
o Stream: o Critical Stream Reach o Depressions/Swales o Lake: ________ _ o Steep Slopes
Soil Type:
Alderwood
(AgC)
Slopes:
6-15%
~Additional Sheets Attached:
Erosion Potential: Erosive Velocities:
Slight Slow
SCS Map and Soil Description, Figure 4
Part 8~DEVEI!OPMEi\FIi;~IMITA'fIONS"~1:f'"'I!:"!;'t" :~,. : 'r~I,:·,~!~::;;;'i:· ,. -:·:f~~"*)..&..;!~),~w:.e l;-r.~ ,:~:·:r~. ~' .: y ',~' .::fi :': ::
REFERENCE
~ Level 1 Downstream Analysis None _____________ _
~ Geotechnical Engineering Study o Environmentally Sensitive Areas o Level 2 Off-Site Stormwater Analysis
~ Levell Traffic Impact Analysis o Structural Report o Additional Sheets Attached
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
~Sedimentation Facilities
~Stabilized Construction Entrance
~Perimeter Runoff Control
~Clearing and Grading
Restrictions
~Cover Practices
~Construction Sequence o Other
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
~Stabilize Exposed Surface
~Remove and Restore Temporary ESC Facilities
~Clean and Remove All Silt and Debris
~Ensure Operation of Permanent Facilities
DFlag Limits of SAO and open space preservation
areas o Other
Saddlebrook Preliminary Plat Page 4
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
:i¥~ft:,19:" ;S4t~~~G ~l\f'{A,J~R,$Y:~l,~foJ1\"'l: ;"ii''''fJ~r .. ~+;.~~ ;:. '~i/!',!ji~ . {<::;:.;";-:',, ,;;",',/'~i' .. ; .::~~:
" .. '1"t~ _k.'}' c,~c.:!~~"~l. ~"~_~~~,Jr:',f",~:.,* . .".~;>, :,;.:,,,.,,, c' ~.·~k" '_' , __ ".,e : ~', iI',..-.: "'<;." ",',.', -. ,1' ~ __ .,:, .:. ... _ " 1!1 _:;.,.'.t., '}. ',/ j,,., ._ ";1>-• o Grass Lined B Tank 0 Infiltration Method of Analysis:
Channel Vault 0 Depression KCRTS
~ Pipe System 0 Energy Dissipater 0 Flow Dispersal Compensation/Mitigatio
0 Open Channel 0 Wetland 0 Waiver n of Eliminated Site
0 Dry Pond 0 Stream 0 Regional Storage
~ Wet Pond Detention N/A
Brief Description of System Operation: Runoff from impervious surfaces will be collected
and conveyed to the detention facility. From there it will be discharged to the
conveyance system in 15Sth Avenue SE.
Facility Related Site Limitations:
Reference Facility Limitation
,part·11'~\· STROc:rURfo,.[ ANALYSIS'I;;! ... , '~.: ~~'. .{>';-!;~':' '.';~ ":1$''1&''~:~'' ;,:.~_ ~'1\". "f;, ':~t'~~l~~: ''''-~ >"~::','; o Cast in Place Vault
~ Retaining Wall o Rockery > 4' High o Structural on Steep Slope o Other:
....... P~rF12, ;::~;t..sEMgN'fSIT:Rf..C"'$:·:~I.J\~ "" .• ,. ". '" . '" ... "... '~'"'' ....~. ~. "'.,\.,," .' ,",._,,:,"'1\"" ~ ,", l. "," 1.' '/!',. " ".-•. ~ . .;r . ,,,.'""" '_ ,-,. ,:';;'J,' " ~.;;' , ' ... , .•• ' _ ... -. I"~,;_~.::i>;~.,~ ..... , • ' .> _." ","
~ Drainage Easement o Access Easement o Native Growth Protection Easement
~ Tracts o Other:
.:part·13TSlqt::J~:r9FE:PIT-'i!~9Fl;sgJqN.At:.'ENGINE:ER,<;~ "J,: ':Z~:"l> '". . ":""' .
• '1Il:<-"f'1~";:;"""~ "">"''''~'I,,':~''~' '4~r~·"'.'~;·l~. ,_ ;j.yf.\~ \!.il~"~jil(_ .. t~ ~--~,.I~J~'" ~.H-,h'I'lIIrf:W~':9~~''''-.':':.;";',,,~ &-,,, %1 .' :~,0.11\";.,~,.,.:.:.........;_::.-.. :a.... .. ~.,..:_::.~",:.. .... _,,._~~ .... -:~, ~~_. _:~" -'-'~ , ' '.-~..L:.IO>-~~~.-:'~~
I or a civil e ineer under my supervision have visited the site. Actual site conditions
as observed ere incorporated into this worksheet and the attachments. To the best
of my kn Ide the information provided here is accurate.
©2012 D. R STRONG Consulting Engineers Inc.
Technical Information Report
Si nedlDate
Saddlebrook Preliminary Plat Page 5
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
FIGURE 2
VICINITY MAP
The information included on this map has been compiled by King County staff from a variety of sources and is subject to change
without notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or
rights to the use of such information. King County shall not be liable for any general, special, indirect, incidental, or consequential
damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on this I map. Any sale of this map or information on this map is pro,hibited except by written permission of King County.
I
I
I
I
I
I
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat PageS
City of Renton
I
I
I
•
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FIGURE 3
DRAINAGE BASINS, SUBBASINS, AND SITE CHARACTERISTICS
©2012 D. R. STRONG Consulting Engineers Inc.
Technicallnfonnation Report
Saddlebrook Preliminary Plat Page 7
City of Renton
I
..
..
H
II
..
I
I
I
I
I
I
I
I
I
I
I
I
I
~~>-", , ". "''' "-""." ii I
' V'
,,.,, "~ ""'''' n y' "'-" i f' •• -~,." U , " ,,. ,~ ,.-""''' ,
, •• , .. _ •• _. 'VA WEST IDA EAST "_ •• _"" r · -x' 1\ 2.58 AG. ~ ~ . GO ~ ... , ,,''''' I', , , 11: 78 f\§':l.;,. --1\ ~, --AI ""~f">-&--__ " l.,J.,:)." ~ " JC
" .. I ;1 (d.:) I: '_~'i-;ci'1\M~M ~ '( -"-,,' .-,1 \111 ,'II~'?I"'" I,· In 0 t--J, J.-. ,Y';y' -n I ..., _ , I 1'1 I , n ~ "e "~ "0" /' " " '''' ", ,
r ---=]r-"" -" r -1:' -, r::, 7-'~"', }' .., .--"<)1 ,,~ , -:T;' " 1 '-I I 'So, --, I I I I I _ -' . n' I I _ ' " I I I I I -: ~ ~ , IJ.J
-': " .. ' 'o,. -rr, 9 "!' '" / " "!' , , , ',J ~
;';'i ( rt l\j, ;r.=~~, 's· I I 7 I J \ 6 I I " I I 4 I I " 3 I I 2 I I 1 I "1 i'C ~~. 1 ,,";~"'"~" 'I", I,' 5 " ".. , , , , , ;,-~ I "I~ 00 ,', "." "" u" " ", " : .... 1].. , " g I ~ ~. lll'~ '~" "." , .~;r ... ,. ... , , , , " ; "':" ····i· "::~'.r "'''''''''''Rmm ::;;: i~ \ (. lL _....J' L -r·.L.J., L --'~ -jJ L - - -_..J L - - -_..J L,. ___ ..J L -,. __ ..J L... ___ ....J " I UPSTREAM END TO
'« -,~" , I ~ ~ " 1 IY UJ ~. DETENTION POND
.,., ~'~ , k-~... 1 ~
r-; . !11>1, , , .... f"';. >;: l' I_ .. ' __ ~" , '~, .-, \ I ~. ~, \. D 1 ... N.) -4.\ ~
III '" , ~. 0 0 ",J'L '....L '"'" "~ "" ~ ';,:-, r' "'.'".. • lrF0
'I ""'"", " 0 u .. .~, ...,. ~ """ .Me .1.,I.! L' ,~ .kC ~ "-,,, • (. , • £:; ,,"' ,.. ~J -.. L.. _ .<~ _ L\:., .',.. -. ',.,' _ ol~ '. • ---:4 N , ...... ,,-, " '.-" ROAD 'o~ ·IL " L .' :I~ I
"" I t.1 ~,~ 1.1! ".L' . .,:j, ... L.1... -' ..h.L J.. l' -" ..1. ...L'..t:::,...L ~.J "" I\. I1(Jj , '~ '\, 'i' . 'iI'" ' 'T' ,'-,.L... .L...,' '\r .' r' '~I! 4' . ' , I 1 'l,'" ~ ::::--.~ 'AA' -.....; < .'" __ , __ " 1-_ I , = ~ , 'I ., " :--It'-,, ,_ I ~' , ' '.', :--...'~ -. I , . ' . ' . . X I .. ' " , ;;;:
V) I i\' " -2 ...... -.~ I:" I' --r I - --,"7-I I - - - -I I 7-- -I ,-- - -., • 1\ IV)
" 1" ~\ \ I I I I 1 .. / I I I V I I I I il'l ~ f'll II I 1 ~. -, ",-' ~\--------j ~ -'''''-.:!1.''''r-l I I I -1 I I 1./ 'f-!
'1 • ... . ~7' '.~ -(] 9" 10 I " 11 " 12 l 1 13 " 14 / >f f • 0
IW..l1 ~, 1 niAcn"'A o. , , I ': ' , 'I. 1 : : I' ~ ~.I~lIl."f ~,I"i.111 " 'll~-~.;~fUtl~l\l!1 " I I I I I I I I # ~ ,1::01'
I I I. ~" I I ~.. I I I I I I"~ I I '~~~AA'"~"ak""'" ; ~\l .. , , , 'LL 'L ~""."'. ~ , ,j '1\\ .. '-.J -.J -.J L -.J:::..., ..J -,,?,' ","0 .~ , I' ' II' ,. ,". .. 1 '" ,---~.,. , '0" )(12 "'~ I' 'i ' . , -... ....IL' , , , •• .... r LI~""" . ~ __ • , '"
0' ~ j If)~~~i' "-i-d"~ -, a -~.. ..~, ,.W''' 'T' ~ ""'" ' ';; ,',", .. "I" ;: ,'Q.V • .' ~"I~ ~ I' ~" -I. '..... . "''''''''''''''',-.,E . " .. ... , " :;;:
11 ~ ~ k t-~~~~!o ;~;~TlNG' CONSTRUCTlOFiNF, g ""OW,"-~' J~ I EXISTING AND CONSTRUCTION ' Il" ',\:!';'~,~.:;~~:' AND DEVELOPED RUNO u , • )1
1
1 '-iRUNOFiF EXIT SITE HERE low,." H"" __ , 0 i!l,o
i 'I I J
12" Ci'f' 1(~4Q5.76 --1
h
"" , "
LEGEND NORTH
SITE BOUNDARY GRAPHIC SCALE
=-= co BASIN BOUNDARY o 30 60 120
fQ til ~ ~I ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
'" '" ~ i ~ Q8 !; ~ II.~'·.'.· ~l;
fD ,,'I !Ii 0 , ' I ~ -
~:::<:-:~
~ i:::
..... CI)
'C[ ~
.,.J ~
Q.,: 0
~ ~
Q: ~ ~ (jlJJ~
;:: ~ C/) 0
;!is iii ~ I'
-!:l;;e ~ i':'! <:!Jj:t .,.. '«::>: CIj ~ ~~~ ... -" ~ C/)lO~
O Q!i~o !lllOI'
C) ~~rfi ~ !fi ... a:
LLi ~ C/) ~ Q!i
Q ~ ~ ~ -~
DRAFTED B~ CIM
DESIGNED 8Y: IIAJ
PR(}.£CT CNGlNEER: lIN
DA Tf:: 0427..,,2
PRO.ECT NO.: r204D
I I I*' "I ~4 ....
R: \2012\O\12040\3\Drowings \Plots \PP\Report 1 INCH = 60 FT. ,-... " ..... , .. "-.".,, .. \1 8/27/2012 11:53:3~ AM PDT FIGURE: :s ]
) 2012, CoR STRONG CONSULTING ENGINEERS INC.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FIGURE 4
SOILS
AgC-Alderwood gravelly sandy loam, 6 to 15 percent slopes
Map Unit Setting
Elevation: 50 to 800 feet
Mean annual precipitation: 25 to 60 inches
Mean annual air temperature: 48 to 52 degrees F
Frost-free period: 180 to 220 days
Map Unit Composition
Alderwood and similar soils: 95 percent
Minor components: 5 percent
Description of Alderwood
Setting
Landform: Moraines, till plains
Parent material: Basal till with some volcanic ash
©2012 D. R. STRONG Consulling Engineers Inc.
Technicallnfonnation Report
Saddlebrook Preliminary Plat Page 8
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
i
I
I
I
Properties and qualities
Slope: 6 to 15 percent
Depth to restrictive feature: 24 to 40 inches to dense material
Drainage class: Moderately well drained
Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately low
(0. 00 to 0.06 inlhr)
Depth to water table: About 18 to 37 inches
Frequency of flooding: None
Frequency of ponding: None
Available water capacity: Very low (about 2.5 inches)
Interpretive groups
Land capability (nonirrigated): 4s
Typical profile
o to 12 inches: Gravelly sandy loam
12 to 27 inches: Very gravelly sandy loam
27 to 60 inches: Very gravelly sandy loam
Minor Components
Norma
Percent of map unit: 1 percent
Landform: Depressions
Bellingham
Percent of map unit: 1 percent
Landform: Depressions
Seattle
Percent of map unit: 1 percent
Landform: Depressions
Tukwila
Percent of map unit: 1 percent
Landform: Depressions
Shalcar
Percent of map unit: 1 percent
Landform: Depressions
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat Page 9
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SECTION II
CONDITIONS AND REQUIREMENTS SUMMARY
The Project must comply with the following Core and Special Requirements:
o C.R. #1 -Discharge at the Natural Location: An adjustment has been granted to
allow for combination of runoff from two basins into one; Adjustment 2012-03.
o C.R. #2 -Offsite Analysis: Analysis is included in Section III. The Analysis
describes the Site's runoff patterns in detail.
o C.R. #3 -The Project is located in the Level 2 Flow Control area but per the
approved drainage adjustment, must adhere to Level 3 Flow Control Standards. A
detention pond will provide flow control as required. The Project is required to match
durations for 50% of the two-year peak flow up to the full 50-year peak flow. Also
match developed peak discharge rates to predeveloped peak discharge rates for the
2-year and 1 O-year and 1 OO-year return periods (KCSWDM, Sec. 1.2.)
Furthermore, the Project must meet the Flow Control BMP requirements as specified
in Section 1.2.3.3 of the Manual. The Project will utilize the reduced impervious
surface credit to meet this requirement.
o C.R. #4 -Conveyance System: New pipe systems and ditches/channels are
required to be designed with sufficient capacity to convey and contain (at minimum)
the 25-year peak flow, assuming developed conditions for onsite tributary areas and
existing conditions for any offsite tributary areas. Pipe system structures and
ditches/channels may overtop for runoff events that exceed the 25-year design
capacity, provided the overflow from a 100-year runoff event does not create or
aggravate a "severe flooding problem" or "severe erosion problem" as defined in
C.R. #2. Any overflow occurring onsite for runoff events up to and including the 100-
year event must discharge at the natural location for the project site. In residential
subdivisions, such overflow must be contained within an onsite drainage easement,
tract, covenant or public right-of-way. The proposed conveyance system was
analyzed using the KCBW program, and is capable of conveying the 100-year peak
storm without overtopping any structures or channels. This analysis will be
performed at time of construction plan preparation.
o C.R. #5 -Erosion and Sediment Control: The Project provides the nine minimum
ESC measures.
o C.R. #6 -Maintenance and Operations: Maintenance of the proposed storm
drainage facilities will be the responsibility of the City. An Operation and
Maintenance Manual will be included in Section X at the time of construction plan
preparation.
o C.R. #7 -Financial Guarantees: Prior to commencing construction, the Applicant
must post a drainage facilities restoration and site stabilization financial guarantee.
For any constructed or modified drainage facilities to be maintained and operated by
the City, the Applicant must: 1) Post a drainage defect and maintenance financial
guarantee for a period of two years, and 2) Maintain the drainage facilities during the
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat Page 10
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
two-year period following posting of the drainage defect and maintenance financial
guarantee.
o C.R. #8 -The Project is located in the Basic Water Quality Treatment area. The
combined detention/wetpond facility will accommodate this requirement.
o S.R. #1 -Other Adopted Area-Specific Requirements: Not applicable for this
Project.
o S.R. #2 -Floodplain/Floodway Delineation: Not applicable for this Project.
o S.R. #3 -Flood Protection Facilities: Not applicable for this Project.
o S.R. #4 -Source Control: Not applicable for this Project.
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat Page 11
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SECTION III
OFF-SITE ANALYSIS
An offsite Level One Downstream Analysis was prepared by D.R. STRONG Consulting
Engineers Inc. and is included in this Section.
©2012 D. R. STRONG Consulting Engineers Inc.
Technicallnfonnation Report
Saddlebrook Preliminary Plat Page 12
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
LEVEL ONE DOWNSTREAM ANALYSIS
for
SADDLE BROOK
Preliminary Plat
13426 1561h Avenue SE, Renton, Washington
DRS Project No. 12040
Renton File No .. ___ _
Owner/Applicant
PNW Holdings LLC
9675 SE 36t~ Street, Suite 105
Mercer Island, WA 98040
Report Prepared by
[~)
D. R. STRONG Consulting Engineers, Inc.
10604 N.E. 38th Place, Suite 232
Kirkland WA 98033
(425) 827-3063
©2012 D. R. STRONG Consulting Engineers Inc.
Report Issue Date
August 27,2012
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
lEVEL ONE DOWNSTREAM ANALYSIS
SADDLE BROOK
TABLE OF CONTENTS
TASK 1 DEFINE AND MAP THE STUDY AREA ......................................................... 1
TASK 2 RESOURCE REVIEW ..................................................................................... 5
TASK 3 FIELD INSPECTION ..................................................................................... 15
Upstream Tributary Area ............................................................................................ 15
General Onsite and Offsite Drainage Description ...................................................... 15
TASK 4 DRAINAGE SYSTEM DESCRIPTION AND PROBLEM DESCRIPTIONS ... 16
Drainage System Description ..................................................................................... 16
Downstream Path TDA East ................................................................................... 16
Downstream Path TDA West .................................................................................. 17
TASK 5 MITIGATION OF EXISTING OR POTENTIAL PROBLEMS ... ~ ..................... 24
List of Figures
Figure 1 Vicinity Map ....................................................................................................... 2
Figure 2 Site Map ............................................................................................................ 3
Figure 3 King County iMap Topography ......................................................................... .4
Figure 4 Streams and 100-Year Floodplains and Floodway ............................................ 6
Figure 5 King County iMap Wetlands ............................................................................... 7
Figure 6 King County iMap Erosion Hazard Areas .......................................................... 8
Figure 7 King County iMap Landslide Hazard Areas ....................................................... 9
Figure 8 King County iMap Seismic Hazard Areas ........................................................ 1 0
Figure 9 FEMA -Flood Insurance Rate Map ................................................................. 11
Figure 10 King County iMap Drainage Complaints ........................................................ 12
Figure 11 USDA King County Soils Survey Map ........................................................... 13
Figure 12 Downstream Map ........................................................................................... 19
Figure 13 Downstream Table ......................................................................................... 20
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Preliminary Plat
Page i of i
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TASK 1 DEFINE AND MAP THE STUDY AREA
This Offsite Analysis was prepared in accordance with Core Requirement #2, Section
1.2.2 of the 2009 King County Surface Water Design Manual (Manual). The Site is
located at 13426 156th Avenue SE in Renton, Washington.
See Figure 1, Figure 2, and Figure 3 for maps of the study area.
©2012 D. R. STRONG Consulting Eng"lneers Inc.
Level One Downstream Analysis Saddlebrook Preliminary Plat
Page 1
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I SITE
FIGURE 1
VICINITY MAP
The information included on this map has been compiled by King County staff from a variety of sources and is subject to change
without notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness,
or rights to the use of such information. King County shall not be liable for any general, special, indirect, incidental, or consequential
damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on
this map. Any sale of this map or information on this map is prohibited except by written permission of King County.
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Preliminary Plat
Page 2
City of Renton
I
I FIGURE 2
I SITE MAP
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
©2012 D. R. STRONG Consulting Engineers Inc. Page 3
I Level One Downstream Analysis Saddlebrook Preliminary Plat City of Renton
an-o:tIWf':I t9IJG' J.ZBTiZt 0
CCOfJ6 VM "ONV'1>n/DI ZU# '1d IIIIJe !!IN taJ(Jl
B~S S~NNnd fn/33NJ0N3
S/J33NIDN3 DNU 7nSNOa
DNO/JJ.s "/J"O
~ , • ~
;,
~~=iiiii!!)
~ ~
8
;,
~-------
-----, ,
I
,
I ,
I
I ,
I ,
\
I
I
,
\
, ,
,
\,
, ,
\
\
\
\
I
I
, ,
,
\
, ,
\ , ,
\ ,
\
/
/
)
If /
/ ,
,
,
101
I
"'~g ~~.
" ," .~ , :0':" • w.
-.. -.. -..
~-
, , ,
,
I ,
@
I ,
,
\
\
\
/
/
..
S'(S'( 7'1N'I3.LISddO
d'lW3.LIS
.1 tnd AHtfNlIIiI113Hd )JOOH83700tfS
I
, , ,
,
\
, , ,
, , ,
,
, ,
,
, , ,
'0· ~~i
I' ." ~ ,
•
w
,
\ , , , ,
, , , , ,
-
, ,
\ ,
\
I
I
I
'!
~ ON ~ aii 2"'~" ~ ;,.-"!!J, ~. i ~.1~~ ~~~-• ~
~ , w
,
\ , ,
~
~
~
\
\ /
'\ /
'-~ J
-/
, , , , , , , , , , ,
/
,
, / , /
"
, ,
\
\
\ ,
\ ,
\
, ,
,
r-~-"-x-+
I I & ' ,
X ,
,
5§
11 "w ~~
'" -< ••
, .-, , ,
I
-
I
I
\
\
I
I
I
-
/ ,
"
~
\
, ,
,
-
;j • §
a
N
I ~
I-UJ ti: ..J «
~ (.) a rJJ <0
!:2 a " <0 :c :c
0 0-(.)
~ Z
a ~ (9 '" Z a
~ ;l:;::;1
s~s , , ,
zitvi
~~~ .. <
';01010
!!!!o!!!!
-- ---
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FIGURE 3
KING COUNTY rMAP TOPOGRAPHY
~ Hlghllghlad Feature
1-_1 County Boundary
X Mountain Peaks
Contours (5ft dar1<)
IV' 1GD;1OG;1000
j'/Olhot
Legend
HIghways
Streets
"'-Hlgh...,
~.N ..-o Parcels
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Preliminary Plat
CJ Lakes and Large Rlve ...
j'/ Streams
Page 4
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TASK 2 RESOURCE REVIEW
o Adopted Basin Plans: May Creek Basin Action Plan was adopted in April 2001.
o Floodplain/Floodway (FEMA) Map: No floodplains exist on site, See Figure 9.
o Other Offsite Analysis Reports: None available at this time.
o Sensitive Areas Folio Maps: See Figures 4-8 for documentation of the distance
downstream from the proposed project to the nearest critical areas. Included, are
sections of the King County Sensitive Areas Folio which indicate the following:
o Figure 4 Streams and 100-Year Floodplains and Floodway: There is a
Class 2 Stream within one mile of the Site along the downstream path.
o Figure 5 Wetlands: There are no mapped Wetlands within one mile of the
Site along the downstream path.
o Figure 6 Erosion Hazard: There are mapped Erosion Hazard Areas
within one mile of the Site along the downstream path.
o Figure 7 Landslide Hazard: There are mapped Landslide Hazard Areas
within one mile of the Site along the downstream path.
o Figure 8 Seismic Hazard: There are no mapped Seismic Hazard Areas
within one mile of the Site along the downstream path.
o DNRP Drainage Complaints and Studies: As shown in Figure 10,there are no
drainage complaints within 1 mile of the Site along the downstream path.
o Road Drainage Problems: None noted.
o USDA King County Soils Survey: See Figure 11.
o Wetlands Inventory: Vol. 3South (1990) -The wetland inventory revealed no
additional wetlands within the downstream path.
o Migrating River Studies: None are applicable to the site.
o Washington State Department of Ecology's latest published Clean Water Act Section
303d list of polluted waters: None listed along the downstream path.
o King County Designated Water Quality Problems: None at this time.
o Adopted Stormwater Compliance Plans: None applicable to this site.
o Basin Reconnaissance Summary Reports: None available at this time
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Preliminary Plat
Page 5
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FIGURE 4
STREAMS AND 100-YEAR FLOODPLAINS AND FLOODWAY
~ Hlghfigh1sd ""atun!
,-_, County Boundary ~ X _lnPaak.
Highway. j'/
SlnIats ;V
~ -" . ......... 0
iV ...... ;V
0 Parcel. [!§)
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis
Legend
SAOSlnlam
CloD'
ClalsJ Panmniat
Ctass21a1mDnid
CloD.
u_
Lake. and Largo Rivers
Streams
100 Vaar floodplain
Saddlebrook Preliminary Plat
Page 6
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FIGURE 5
KING COUNTY IMAP WETLANDS
~ Highlighted Feature ~ -I County Boundary
I-
x Mountain Peaks 0
Highway. D
Stre.ts ;./
tJ:? -1m!
(cont)
©2012 D. R. STRONG Consulting Engineers Inc.
level One Downstream Analysis
Legend ....-....
Pareals
Lakes and Large Rivers
Streams
SAO WeUand
Saddlebrook Prelimi~ary Plat
Page 7
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FIGURE 6
KING COUNTY IMAP EROSION HAZARD AREAS
~ Hlghlightad Feature ~ -I County Boundary IV I-
X Mountain Peaks 0
Highways 0
Snata ,N
V# "-W;g
(coni)
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis
Legend -.-
Parcels
Lake8 and Large Rivera
Straams
SAO El'OIion
Saddlebrook Preliminary Plat
Page 8
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FIGURE 7
KING COUNTY IMAP LANDSLIDE HAZARD AREAS
~ ~ HlghllghtDd F •• tun>
-I County Boundary
I-
X Mountain Peak. 0
Highway. [J
Stre ... ;V
v.f -~
(coni)
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis
Legend -load
Parcel,
Lakos and Largo Rivera
Streams
SAO Landollda
Saddlebrook Preliminary Plat
Page 9
City of Renton
I
I
I
I
I
I
I
I
I
I
J
I
I
I ,
I
,I
I
FIGURE 8
KING COUNTY (MAP SEISMIC HAZARD AREAS
~ ;;# Highlighted Feature
-I County Boundary IV I-
X Mountain Peaks 0
Highways D
Slrae'" ;/
~ -~
(cont)
©2012 D. R. STRONG Consul1ing Engineers Inc.
Level One Downstream Analysis
Legend -......
Parcels
Lakes and Large ItiV8rti
Streams
SAOSellmic
Saddlebrook Preliminary Plat
Page 10
City of Renton
I
I
I
I
I
I
I
I
I
I
I
•
I
I
I
I
I
FIGURE 9
FEMA -FLOOD INSURANCE RATE MAP
ZONE X 14
SO!JTHfA.ST
!¥Jlli!l
D
LEGEND
SPEO-\I ruxm It"'lARO "RCA." INUNj'J,\lW
UY I~NI-YtAR flOOD
ZONt AH fI.ot! r~i"~' •• 1 ~) , "'l , ..... ,"1' , ... ."
d "".'''1):.' 1>"". I'j,.~r ... ,~,~ ... .
,"'-VI""",,",.
ION! AO 1i".1 ,I.,."" ." I ,,, I ",1 '"".,U~ oJ • .,
I~ ... ,., .I",""A 1m,,",'. 4"~.0!I" <I'l~'"
.\0-1",,,,,,,,'<1. r,~ ~"".,,/ .~"I L., Ib<l","
\ .. ~d • .,. ..... , d,lI ........ ,.l
'lON( A" To> ",. ,m"" "., IN"" I' .. · .. ," ,h.1 I,,·
, ... h.d (l, •• 1 1""''''''"' ~"'.", _~
""""".,_"" •• ' b.t.< •• "'~ ... "" rI. .......... .r
ZONE V {".'''.d ~,"", .... It ,,4"~' ""'.',1 i .... ",,~
.. 1."'10 , .. ["".. iIo •• 1 ..... .>1><> ... , ... ,~ ........ d
ZONE \IE I ,,1>1,\1 ~,,"I ,,"" ,~, .. ,~ t,. ... nI ' .. "" ... , ..... , !>,'". 1 •• >tI " ... ~ri, ... "' .. ¥, ........ J
flOQ()W!W AR[A" IN ZONE AI
Oni[R fLOOD ARMS
ZONf lC ~ ..... ~ '\QIJ.}N' Ikoud, .lIN> ,~ 10:>-\'0'.
11.<.<l ..... "'<'f,,!,:," ""'''' .. Ii ~ .... ~ •••
I J" ... ," "ilh dl,"""," "tt' •• I,,,,, U ... n
1 ,..tw". ",110: ~",I ...... pM .. ~to.'<l l~
1", ...... I""" 1~ fk>o<l
OTHER ARrAS
ZONE X
ZONE D I,,,,,, In ",hi,h ~, .. I h.IUm.. .".
...... Ioo.......-od
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis
'"""
'3OT" ,m"
I
-
Saddlebrook Preliminary Plat
\
Page 11
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FIGURE 10
KING COUNTY IMAP DRAINAGE COMPLAINTS
E:SI S.IOClad PI',,~I.
",_1 CoIIIIy IIoundary
x Mountain Poaks
Highway.
# li1cori>arolad "",'
Slreota
(conll
l.egand
#..."V-~~ o PaRolo . D Lllkoo and LIIrgo Rlv.ro
,M Streams
E) orolnago Complalnla
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Preliminary Plat
Page 12
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•
FIGURE 11
USDA KING COUNTY SOILS SURVEY MAP
.. ".,.
AgC-Alderwood gravelly sandy loam, 6 to 15 percent slopes
Map Unit Setting
o Elevation: 50 to 800 feet
o Mean annual precipitation: 25 to 60 inches
o Mean annual air temperature: 48 to 52 degrees F
o Frost-free period: 180 to 220 days
Map Unit Composition
o Alderwood and similar soils: 95 percent
o Minor components: 5 percent
Description of Alderwood
Setting
o Landform: Moraines, till plains
©2012 D. R. STRONG Consulting Engineers Inc.
level One Downstream Analysis Saddlebrook Preliminary Plat
Page 13
City of Renton
I
I
I
I
I
I
I
.1
I
I
I
I
I
I
I
I
I
I
I
o Parent material: Basal till with some volcanic ash
o Properties and qualities
o Slope: 6 to 15 percent
o Depth to restrictive feature: 24 to 40 inches to dense material
o Drainage class: Moderately well drained
o Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately
low (0.00 to 0.06 in/hr)
o Depth to water table: About 18 to 37 inches
o Frequency of flooding: None
o Frequency of ponding: None
o Available water capacity: Very low (about 2.5 inches)
Interpretive groups
o Land capability (nonirrigated): 4s
Typical profile
o 0 to 12 inches: Gravelly sandy loam
o 12 to 27 inches: Very gravelly sandy loam
o 27 to 60 inches: Very gravelly sandy loam
Minor Components
Norma
o Percent of map unit: 1 percent
o Landform: Depressions
Bellingham
o Percent of map unit: 1 percent
o Landform: Depressions
Seattle
o Percent of map unit: 1 percent
o Landform: Depressions
Tukwila
o Percent of map unit: 1 percent
o Landform: Depressions
Shalcar
o Percent of map unit: 1 percent
o Landform: Depressions
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Preliminary Plat
Page 14
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TASK 3 FIELD INSPECTION
UPSTREAM TRIBUTARY AREA
In evaluating the upstream area, we reviewed King County IMAP aerial topography and
imagery and conducted field reconnaissance and have concluded that upstream
tributary area for the Site is negligible. The upstream properties developed portions
drain in southeasterly and southwesterly directions almost directly to the respective
rights of way and the areas producing runoff that may enter the Site are densely
vegetated.
GENERAL ONSITE AND OFFSITE DRAINAGE DESCRIPTION
The 4.36 acre parcel is situated atop a ridge and discharges runoff into two subbasins.
TDA West is approximately 1.78 acres and discharges to 156 th Avenue SE while TDA
East is comprised of the remaining 2.58 acres and discharges to 158th Avenue SE. The
discharge elevation of TDA West is approximately six feet lower than that of TDA East.
These two flowpaths converge at a point approximately 3,000 feet downstream of TDA
West and 4,900 feet downstream of TDA East at the corner of 156th Avenue SE and SE
144th Street.
Runoff from the developed Site will be collected and conveyed by a typical catch basin!
pipe network to a detention pond in the southwest corner of the Site. The pond will
discharge to the conveyance system in 156th Avenue SE.
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Preliminary Plat
Page 15
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TASK 4 DRAINAGE SYSTEM DESCRIPTION AND PROBLEM
DESCRIPTIONS
DRAINAGE SYSTEM DESCRIPTION
The downstream analysis is further illustrated and detailed in the Downstream Map and
Downstream Table located in Appendix A. The downstream area is located within the
Cedar River; more specifically the Lower Cedar River sub basin. The downstream area
was evaluated by reviewing available resources, and by conducting a field
reconnaissance on July 12, 2012 under overcast conditions.
Downstream Path TDA East
Point "A" is the natural discharge point of this subbasin. Runoff exits the Site as sheet
flow to the southeast.
From Point "A" to Point "8", runoff heads southeast as sheet flow and into a roadside
ditch. (0' -±10')
From Point "8" to Point "C", runoff travels southerly as channel flow. The grass-lined
channel is approximately 3 feet wide and 2 feet deep. The water depth was 2 inches at
the time of analysis. (±1 0' -±25')
From Point "C" to Point "0", runoff continues south as pipe flow via a 12-inch Lined
Corrugated Polyethylene (LCPE) Pipe. The pipe discharges into a channel at Point "0".
(±25' -±55')
From Point "0" to Point "E", runoff travels southerly as channel flow. The grass-lined
channel is approximately 3 feet wide and 2 feet deep. The water depth was 3 inches at
the time of analysis. (±55' -±1 00')
From Point "E" to Point "F", runoff continues south as pipe flow via a 12-inch LCPE
Pipe. The pipe discharges into a channel at Point "F". At the point of discharge, the
water depth was 6 inches at the time of analysis. (±1 00' -±130')
From Point "F" to Point "G", runoff travels southerly as channel flow. The grass-lined
channel is approximately 3 feet wide and 2 feet deep. The water depth was 6 inches at
the time of analysis. (±130' -±155')
From Point "G" to Point "H", runoff continues south as pipe flow via a 12-inch Reinforced
Concrete Pipe (RCP). The pipe discharges into a channel at Point "H". At the point of
discharge, the water depth was 6 inches at the time of analysis. (±155' -±190')
From Point "H" to Point "I", runoff travels southerly as channel flow. The grass-lined
channel is approximately 3 feet wide and 2 feet deep. The water depth was 3 inches at
the time of analysis. (±190' -±31 0')
From Point "I" to Point "J", runoff heads east as pipe flow via a 12-inch Corrugated
Metal Pipe (CMP). This is located near the intersection of 15Sth Avenue SE and SE 2nd
Place. The Pipe tees into a 15-inch LCPE Pipe heading south on the eastern side of
15Sth Avenue SE. (±310' -±340')
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Preliminary Plat
Page 16
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
From Point "J" to Point "K", runoff is directed south as pipe flow via a 15-inch LCPE
Pipe. The pipe connects to a Type 2 Catch Basin located near the intersection of 158th
Avenue SE and SE 2 nd Place. (±340' -±370')
From Point "K" to Point "L", runoff heads east as pipe flow via a 15-inch Ductile Iron
Pipe (DIP). The pipe connects to a Type 2 Catch Bain. (±370' -±440')
From Point "L" to Point "M", runoff heads east as pipe flow via a 15-inch DIP. The pipe
connects to a Type 1 Catch Bain. (±440' -±650')
From Point "M" to Point "N", runoff heads east as pipe flow via a 15-inch DIP. The pipe
connects to a Type 1 Catch Bain. (±650' -±BOO')
From Point "N" to Point "0", runoff heads east as pipe flow via a 15-inch DIP. The pipe
connects to a Type 1 Catch Bain. (±BOO' -±950')
From Point "0" to Point "P", runoff heads east as pipe flow via a 15-inch DIP. The pipe
connects to a Type 2 Catch Bain located near the intersection of SE 2 nd Place and 160th
Avenue SE. (±950' -±990')
From Point "P" to Point "Q", runoff is directed south as pipe flow via a 24-inch DIP. The
pipe discharges into a roadside ditch along the west side of 160th Avenue SE. (±990' -
±1100')
From Point "Q" to Point "R", runoff continues southerly as channel flow. The grass-lined
channel is approximately 4 feet wide and 2 feet deep. (±1100' -±1560')
Qualitative analysis of the downstream path continued through the conve~ance system
in 160th Avenue SE, then west through the conveyance system in SE 144 h Street. The
analysis was concluded at the intersection of SE 144th Street and 156th Avenue SE
which was found to be the point of convergence with the downstream path from TDA
West. (±4925')
Downstream Path TDA West
Point "A" is the natural discharge point of this subbasin. Runoff exits the Site as sheet
flow to the southwest.
From Point "A" to Point "B", runoff heads southwest as sheet flow and into a Type 2
Catch Basin located along the east side of 156th Avenue SE. (0' -±15')
From Point "B" to Point "C", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 1 Catch Basin. (±15' -±1 05')
From Point "C" to Point "0", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 1 Catch Basin. (±1 05' -±330')
From Point "D" to Point "E", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 2 Catch Basin. (±330' -±345')
From Point "E" to Point "F", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 2 Catch Basin. (±345' -±360')
From Point "F" to Point "G", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 2 Catch Basin. (±360' -±435')
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Preliminary Plat
Page 17
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•
From Point "G" to Point "H", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 2 Catch Basin. (±435' -±480')
From Point "H" to Point "I", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 2 Catch Basin. (±480' -±555')
From Point "I" to Point "J", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 2 Catch Basin. (±555' -±595')
From Point "J" to Point "K", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 1 Catch Basin. (±595' -±61 0')
From Point "K" to Point "L", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 1 Catch Basin. (±610' -±750')
From Point "L" to Point "M", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 1 Catch Basin. (±750' -±850')
From Point "M" to Point "N", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 1 Catch Basin. (±850' -±925')
From Point "N" to Point "0", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 1 Catch Basin. (±925' -±1025')
From Point "0" to Point "P", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 1 Catch Basin. (±1025' -±1185')
From Point "P" to Point "Q", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 1 Catch Basin. (±1185' -±1215')
From Point "Q" to Point "R", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 1 Catch Basin. (±1215' -±1350')
Qualitative Analysis of the downstream path continued along 156th Avenue SE. The
analysis was concluded at the intersection of 156th Avenue SE and SE 144th Street
which was found to be the convergence point with the downstream path from TDA East.
(±3010')
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Preliminary Plat
Page 18
City of Renton
I
I
I
I
I
I
Q
I
I
I
I
I
I
I
I
I
I
I
I
©2012 D .. R. STRONG Consulting Engineers Inc.
Lever One Downstream Analysis
FIGURE 12
DOWNSTREAM MAP
SaddJebrook Preliminary Plat Page 19
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I,
I
I
I
I
TDA WEST .m
II
II I /,,-/.-" I"'-~ ~I:
TDA EAST '" , --"' ,
!W~'\_-l ' , , ~ IAlllbi II
Jp
Q
R
VERGENCE POINT
I .,
ffi ~ • g 15 iii ~ ~ ~ "'''' .. ~ q~ ~5 III .,~ l! ~ ! ~8 !H
m fi ~
• Ii 0 ~ ~
III~
NORTH
GRAPHIC SCALE
o 175 350 700
I,· "\ I' ,,%Ii"'''' W,*, I -S&;-~ -o·
1 INCH = 350 FT
....
~
:>..
~ ~ 0.. ~
;!l] ~ ~ ..... ~
rd ~ ~ a: g: iii ::c !2 ~ o ~ 1£ o go
m lI,j a
Q
~
DRAFTUJ BY: CIZ4
DESIGNED BY: lIN
PRO.£CT ENGINEER: IIAJ
DA TE: 0B.21.2OJ2
PRO.ECT NO.: 12tH{)
R:\2012\O\12040\3\Drowings\PJots\PP\Report F1gures\Ol-3DSJ1G12.dwg 6/27/2012 12;18;48 PM PDT III RGURE: 12 -~
COPYRIGHT © 2012. D.R. SlRONG CONSULTING ENGINEERS INC. n
- ------
Basin: Cedar River
-----
FIGURE 13
DOWNSTREAM TABLE
TDA EAST
Subbasin Name: Lower Cedar River
.. ----I!!!!I -
Subbasin Number: N/A
-~X~~ciIC-~ii=~~:if~~::.~ : ·:~~~·,8,:~i,n~~~~~~~~o~n~t-.:~ r~!pp'~;-; ~!t~fi~ ~-~~~I~~~::e~ 1~i~~;~~~F~ ~~,?~\~~~~~~~~~~;i~i~P
~-.-.... ~. ~ ,-, ~-~~"">-""'_-"" -.-.o;-~~"'"'!_-~~-"_--'-.~-_"' ........... -.).~1r~=."-,,'!> ,,""--~'""~-"":' ,~_-~,,,,.'~: ,'_; __ , •. -,-;:, __ .--~,~ "~",,-""'~ -'_-'C_"' ___ "_ .0 __ ,_'" ~"'-
"" .; t~-:"-,-· "Type:. sh~et flow, ~ "? ~'-a _ i' "'~ .,. -~: ~h " -• ~'" ' ~'-' "-r,'~ , ,1 :tConstridions~' under",-capacity, "'pondirm. _ -Jribuljny ~areai 'likelihoo:d--:ioCprob:!~m;.::
'~zf~;~i~~:'j\~~1i~~~~k.~"'V:JE~;:(:;~,~~~~~~t~\rtt~?~'~"t;
A
A-8
8-C
C-D
D-E
E-F
F-G
G-H
H-t
I-J
J-K
Natural Discharge Sheet flow across southeast property
Point corner
Southeasterly Sheet Sheet flow into roadside Ditch
Flow
Southerly Channel I Trapezoidal Channel: 2' Deep, 3' wide
Flow
Southerly Pipe Flow 12" LCPP to a ditch
-
Southerly Channel Trapezoidal Channel: 2' Deep, 3' wide
Flow
I Southerly Pipe Flow 12" LCPE Pipe to a ditch I I
I Southerly Channel Trapezoidal Channel: 2' Deep, 3' wide
Flow
I Southerly Pipe Flow 12" RCP to a dijch
I Southerly Channel Trapezoidal Channel: 2' Deep, 3' wide
Flow
Easterly Pipe Flow 12" CMP to a Tee I I
Southerly Pipe Flow I 15" LCPE Pipe to a Type 2 C8
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Preliminary Plat
±O'
±10'
±25'
±55'
±100'
±130'
±155'
±190'
±310'
±340'
±370'
I None Observed I None Anticipated
None Observed I None Anticipated
None Observed I None Anticipated
None Observed None Anticipated
None Observed None Anticipated
I None Observed I None Anticipated
None Observed None Anticipated
None Observed None Anticipated
None Observed None Anticipated
I None Observed I None Anticipated
I None Observed I None Anticipated
Page 20
City of Renton
I Standing Water 2~ Deep
Standing Water 2" Deep
Standing Water 3-Deep
I Standing Water 6-Deep At South End
of Pipe
Standing Water 6-Deep Throughout
Channel
Standing Water 6-Deep
Standing Water 3-Deep
I Trickle Flow
I Trickle Flow
----- -----
K-L Easterly Pipe Flow 15" DIP to a Type 2 CB ±440'
L-M Easterly Pipe Flow 15" DIP to a Type 1 CB ±650'
M-N Easterly Pipe Flow 15" DIP to a Type 1 CB ±800'
N-O Easterly Pipe Flow 15" DIP to a Type 1 CB ±950'
O-P Easterly Pipe Flow 15" DIP to a Type 2 CB ±990'
P-Q Southerly Pipe Flow 24" DIP to a Roadside Ditch ±1110'
Q-R Southe~y Channel Trapezoidal Channel: 2' Deep, 4' wide ±1560'
Flow
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Preliminary Plat
------
None Observed None Anticipated
None Observed None Anticipated
None Observed None Anticipated
None Observed None Anticipated
None Observed None Anticipated
None Observed None Anticipated
None Observed None Anticipated
Page 21
City of Renton
No Flow
No Flow
No Flow
No Flow
No Flow
No Flow
No Flow
---
- - ----- --- ------ ---
TDAWEST
Basin: Cedar River Subbasin Name: Lower Cedar River Subbasin Number: N/A
. ~yj)1!i21~1 .~. ·Elrai~,~ge"·'l'~.,···. !i>r~iq~g~C::0I11R0!1!lnt,ft; :'S}~j:>e,:: .~;pisian~e:'.' :·:~""5iisting.' ~\: >7~bte~ti~I;r::: ;;'Q,9SE1(v~W)n,~~Qf:fieLd'irJsp~t;:!9r.
" . .q.o.mp.9n~n,"ype,., ~j • p.ll~.9nptlon.:.o· I': .. :. . .• '" ,F[o.rn:~ltE1,,·:grobl.l!ms • ';'" ,Propl,elll.s; c. ; .. res0l!r.~er~.vI~'t"~L()rr~!\lp~nl .'
',' ·.Name,and$ize'· .. '.' '.' '·Oiscnar·e'·; ..... ,. v· ... "'''',:'l''\.}. ' ........ ;'.. .,.,.C·,S
-'I"~ .".'" __ ~ 'I~~_~ -_, ___ '. __ • -.,...._~"<__ --~ .. ~ __ . ;-..... ~", ___ 'J._.~."_'.'_."., .. ~. ~ "-'_
-! \yp~:; ,-st'le_et ,fl~w,) "-~_ -. -_ ,.' .'~:, '~,~:.-. ~~ . 'I' '_ ~ 7~' "-~-~;'. ':; (' qon~triaio~~f, .. U.~d_~r.<' _CP_~~Cjty:,;'PsmQing" 'tritlUta~~ ~re.~t: 1!~lIh~!,d-'<?f -pro~I~~( .~, 'i" ,-
_ ~wale;' .?!re,am, d~':l_~~age"_l3asin, v~getation. gpvE!r, ' '-,'~ %,,_.i -~ -1!4,ijli:=J ,3)g.~_·'; ,.:~y~rfoPPin.gLfli?~iQg,-~a~~-it_~t'QX>;!fg~~j§~ ~ :;Qy~r{l6~, pat~~a~,_pQ,iemi~nm~~~,:
,,:! -_ e-__ ch. '. . " ". ,--.-- -• _ '_' ,--: --_ '_' .' --" ,..-~ -. --l
: cl:la.nnel,-pJp~" ~ ._"., .:' depth, ty~ of sensitive area; volume ~. ~ " """ -k _ ~~. ~.;1, __ :..:, (testfudi.on"t. sco~uring, _-.banl<'. sloughing, ~,.-'~ -.... , -,'~ $' .-., '---: ",,'~ - -~ '-',',-" --• ~'~ ....:: ... -;>r ~ .--, '_, " ;: ~ _~ -\ --' __ ,. .. -_-~ :' "'" -_ -'", "-~: • ,--= ,o.._ .:;, 'c' --, ~ .. -~,Rond; Size>,diameter ''''~-r-'t-'~" ... • , -~ , ~ ·sedimentation,~'incision.~other,erosion"·: -,.~-. ,;, 5~ _" "-~.
S~~a1/~re~~':}-,:r 1>1',:; .. -.,.."':. :.~. ,_ ~_ ,_ ,,-' ::-; .-;' _ ;'.:~:~--'">::''' =-~"t-<::"~ ,,-,!:~ ,~---i-.=,=~-;;::'''_ ,~1-;=;~." :~':i -,;,.';; "H_
. See,inap,
',''''' <-', -r.c
'--t-
"'-
Lf"
A Natural Discharge Sheet flow across southwest property I I ±O' I None Observed I None Anticipated
POint corner I I I I
A·B Southwesterly Sheet Sheet flow into a Type 2 CB I I ±15' I None Observed I None Anticipated
Flow
B-C Southerty Pipe Flow 12" PVC to a Type 1 CB ±105' None Observed None Anticipated Trickle Flow
C-D Southerly Pipe Flow 12" PVC 10 a Type 1 CB ±330' None Observed None Anticipated Trickle Flow
D,E Southerly Pipe Flow I 12" PVC to a Type 2 CB ±34S' None Observed None Anticipated Trickle Flow
E-F Southerly Pipe Flow 12" PVC to a Type 2 CB ±360' None Observed None Anticipated Trickle Flow
F-G Southerly Pipe Flow 12" PVC to a Type 2 CB ±43S' None Observed None Anticipated Trickle Flow
G-H Southerly Pipe Flow 12" PVC to a Type 2 CB ±480' None Observed None Anticipated No Flow
H-I Southerly Pipe Flow 12" PVC to a Type 2 CB ±SSS' None Observed None Anticipated No Flow
I-J Southerly Pipe Flow 12" PVC to a Type 2 CB ±S9S' None Observed None Anticipated No Flow
J-K Southerly Pipe Flow 12" PVC 10 a Type 1 CB ±610' None Observed None Anticipated No Flow
K,L Southerly Pipe Flow 12" PVC to a Type 1 CB ±7S0' None Observed None Anticipated No Flow
L-M Southerly Pipe Flow 12" PVC to a Type 1 CB ±8S0' None Observed None Anticipated No Flow
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Preliminary Plat
Page 22
City of Renton
- ------ ----- ----
M-N Southerly Pipe Flow 12" PVC 10 a Type 1 CB ±92S' None Observed None Anticipated No Flow
N-O Soulherly Pipe Flow 12" PVC 10 a Type 1 CB ±102S' None Observed None Anticipated No Flow
O-P Southerly Pipe Flow 12" PVC 10 a Type 1 CB ±118S' None Observed None Anticipated No Flow
P-Q Southerly Pipe Flow 12" PVC to a Type 1 CB ±121S' None Observed None Anticipated No Flow
Q-R Southerly Pipe Flow 12" PVC to a Type 1 CB ±13S0' None Observed None Anticipated No Flow
._---------~------------L __ ------------
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Preliminary Plat
Page 23
City of Renton
.. --
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TASKS MITIGATION OF EXISTING OR POTENTIAL PROBLEMS
A review of the King County Water and Land Resources Division -Drainage Services
Section Documented Drainage Complaints within one mile of the downstream flow
paths revealed no complaints within the last ten years.
The project should not create any problems as specified in Section 1.2.2.1 of the
Manual and therefore is not required to provide Drainage Problem Impact Mitigation
subject to the requirements of Section 1.2.2.2.
Project runoff from both TDA's will be combined, collected and released per the
Manual's requirements to accommodate Level 3 Flood Problem Flow Control and Basic
Water Quality requirements. During construction, standard sediment and erosion
control methods will be utilized. This will include the use of a stabilized construction
entrance, perimeter silt fencing, and other necessary measures to minimize soil erosion
during construction.
R:1201210\12040\3IDocumentsIReportslPreliminaryILeveI1 DS 12040.docx
©2012 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Preliminary Plat
Page 24
City of Renton
U
I
I
I
I
I
I
I
I
I
I
I
i I
I
I
I
I
I
I
SECTION IV
FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN
EXISTING SITE HYDROLOGY (PART A)
KCRTS was used to model the peak runoff from the Site. Per Table 3.2.2.b of the
Manual the soil type is modeled as "Till" for the Alderwood gravelly sandy loam SCS
classification as shown in Figure 4. Soils. The entire Site is modeled as "Forest."
Results of the KCRTS analysis are included in this section.
Area Breakdown
Till Forest 200420 4.60
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat Page 13
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PRE-DEVELOPED HOURLY TIME STEP MODELING INPUT:
PRE-DEVELOPED HOURLY TIME STEP MODELING OUTPUT:
Flow Frequency Analysis
Time Series File:predev.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak
(CFS)
0.290 2 2/09/01 18:00
0.079 7 1/06/02 3:00
0.215 4 2/28/03 3:00
0.007 8 3/24/04 20:00
0.128 6 1/05/05 8:00
0.223 3 1/18/06 21:00
0.188 5 11/24/06 4:00
0.371 1 1/09/08 9:00
Computed Peaks
©2012 D. R STRONG Consulting Engineers Inc.
Technical Information Report
-Peaks Rank
(CFS)
0.371 1
0.290 2
0.223 3
0.215 4
0.188 5
0.128 6
0.079 7
0.007 8
0.344
Saddle brook Preliminary Plat
Return
Period
100.00
25.00
10.00
5.00
3.00
2.00
1. 30
1.10
50.00
Prob
0.990
0.960
0.900
0.800
0.667
0.500
0.231
0.091
0.980
Page 14
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FIGURE 5
PREDEVELOPMENT AREA MAP
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddtebrook Preliminary Plat Page 15
City of Renton
SS/.I1l -,
RIIoI .. S03.7J
IE 8" PVC S.~494.SO
r<>.j'j .
~~_~~.47 ~ I~r-I'"" '"
~ . -,
Iffi \ W1-
, , ,
12" CONe 1t-50J.e.8 ' "-~
, ~ ~ :i :;: ~ ~:i::g
" II'! " 1..--:-"....'3'_ ~(.':ln.." ~¥'<.A __ -.'
I,. \!L-rot. ' -. -, ~:, ~~'~'~ }y" >y<>s(Y?Q< w _._~
Il' ~'li0 ~~, .0< (X) ,,_ I )< N~ x,x,x.><x
", xx x " ~<X~)«.>< ,x. -Y ~~ . x ' _ x "xx I ~ x-x )\?V)(~ ~ ~ J
)(><K; x "( xx -x x X 'Xx x; >t' >t')(' _.J,';"r . '~. . \ ,~ )< -~x , )< . ~ h':><.> :)<)::.)<./-N )< ;;xv..;q:.)' J<0,
"'-,-e •• m."" I , ~. I:X !i()<
IE Ii" P" .. C " ...... 2.81 1 4t,; I ~X:~~. " , ~
".~'''_'''''m~
Ol-l-;::' if x x'X'X
\ qiil ~~ ~ VQ<,
oi-K ~x . "x )()(~
"f K' " XX; f,<~' , \ t y
11, ,~~_~ ~~S0<S
~\ ~., 1 )':0'«-." )( ": )( )( Xx' " ~ :7<. XX
~ ~
f---
x ~ 1«; ~ ~'> ~ x')( 'F 'X xxs< XX:
? ~c '~19<. W \
'''''------J ~ ":l')~ 'v _ c";:::::1: >--I ~~.' , j>~ ~)< ~ II i . "~ r). >0 x: "
" • ~'.,1 , " x)< ,:)W~ ,
f,' ~ ~ . >< ;)< ?<x xx~ x -x "'" , "l_______ I. .,' " 'V f<x, ~ , ,l 1 i!>< ~.
, [rj 1---, ' , . ~
,'!>.<;' "x ~6'Vi~ ~.x . X ' I)I,:X x x )< ~ .)< , ,I I! tb< r" 'xx· ,'X' ~ '. . ~(0. ~ ~~~~_
. ~ ~, )( )( )< x ,.)1' )1 Y x ,~ X) . ", .~
>(>< XJ\) ~~ X ~ >0:VX ><y ,IY')X.)< "»x,, x (X)
!x:' ' X 'y: ~. ~''7;. 0<0
1\ ,
" ~
b( . \ Y.~~'!&' xxx.
I 1<' .Ix' \ x0 A' -, "'0xY
, ,~, ,)% ~> ~~x )OX-{1t mm' ,x ;)< x,: . 'Y3tx ~,~ (J'p-• I I. ~~/-~.... ~ RJY-~~ ~ ~ \ ... --
e" PVC N •• ·Hl.5J I I n'Pt: u ce \ ~
8" PVC W _473 63 I RIIo\.o489.40
I!" PVC i"47J:5J ~ IE 12" PVC N.-4PlS.57
, -IE 12" PVC $._4M.74
IE 4" CPP E.-486.78
r-Jr I, ~
AREA BREAKDO WN
TOTAL EXISTING SITE AREA:
TOTAL PROJECT AREA:
TOTAL PROJECT DEVELOPMENT AREA:
189,797 S.F. (4.36 ACRES)
200,420 S.F. (4.60 ACRES)
200,420 S.F. (4.60 AC)
MOOELED AS TILL FOREST
x
~ ~~
:)< X
Ii ,-:' )('X 'X 'X 'X x)<
x
& x
~
xQQ< ~ . ,
::.. -".;.... '-~ 'SHED' ..... ~
LEGEND
= == = PROJECT BOUNDARY
f88l TILL FOREST
V''J''''~ I--
.,""
x
, ,
I--
~
,f'
NORTH
GRAPHIC SCALE
o 30 60 120
I· ""''''\''o. '1.1 ·F "",,I
1 INCH = 60 FT.
'" !Ii ~ (5
~
\!)\!)
~~
I!:s
"'!(,! <':0 tio
...
~
)..
I I ~ ~ q~ : ~ ~ ffi ~ ~ ~ u ~
(I) is! ~ u~
• ~ 0 ~ I
a:: ). ~ 8~~ ;;;;; a!JJ ~
!!=:: Cl::::S ~ ;::J r:l r5 ~ ~ :S::s: ~ Q:: J::" ~ " -I!:!;X: s: .... _ J-;:
~ CI) l8 :;::-
"" (!) ..... 0 g ~~~
a:: ~~~ ffi
8
~
DRAFTFO 8Y: CII4
DESIGNED 8Y: IIAJ
PRO.£CT ENGINEER: lIN
DATE: f1IJ.27~fl
PRO.ECT NO.: ,/lOtI()
R: \2012\0\12040\.3\Orawings\PJots\PP\Report Figures\0I-.3flG512040.d'llg B/27/2012 11: 55: 45 AM POT AGtJR£.: 5 J
COPYRIGHT © 2012, O.R. STRONG CONSUL l1NG ENGINEERS INC.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DEVELOPED SITE HYDROLOGY (PART B)
DEVELOPED SITE AREA HYDROLOGY
KCRTS was used to model the developed peak runoff from the Site. The soil types are
unchanged from the pre-developed conditions. The portions of the Site within the
proposed clearing limits tributary to the proposed detention vault were modeled as "Till
Grass" and Impervious as appropriate. Results of the KCRTS analysis are included in
this section.
Area Breakdown
RD In, Collected
Lot Area
Impervious (45%)
Pervious
ROW
Impervious
Pervious
Tract A
Impervious
Pervious
Totals
Impervious
Pervious (Till Grass)
Bypass
ROW
Impervious
Pervious
Lots, Tract A
Impervious
Pervious
Totals
136063
61228
74835
35190
35190
0
20747
10374
10374
106792
85208
7120
3936
3184
1305.00
0.00
1305.00
3.124
1.406
1.718
0.808
0.808
0.000
0.476
0.238
0.238
2.452
1.956
0.163
0.090
0.073
0.030
0.000
0.030
Impervious 3936 0.090
Pervious (Till Grass) 4489 0.103
©2012 D. R. STRONG Consulting Engineers Inc. Saddlebrook Preliminary Plat
Technical Information Report
Page 16
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DEVELOPED HOURLY TIME STEP MODELING INPUT:
DEVELOPED HOURLY TIME STEP MODELING OUTPUT:
Flow Frequency Analysis
Time Series File:rdin.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak
(CFS)
0.769 6 2/09/01 2:00
0.613 8 1/05/02 16:00
0.928 3 2/27/03 7:00
0.647 7 8/26/04 2:00
0.783 5 10/28/04 16:00
0.815 4 1/18/06 16: 00
0.940 2 10/26/06 0:00
1. 57 1 1/09/08 6:00
Computed Peaks
©2012 D. R. STRONG Consulting Engineers Inc.
Technicallnfonnation Report
-Peaks Rank
(CFS)
1. 57 1
0.940 2
0.928 3
0.815 4
0.783 5
0.769 6
0.647 7
0.6l3 8
1. 36
Saddlebrook Preliminary Plat
Return
Period
100.00
25.00
10.00
5.00
3.00
2.00
1. 30
1.10
50.00
Prob
0.990
0.960
0.900
0.800
0.667
0.500
0.231
0.091
0.980
Page 17
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BYPASS HOURLY TIME STEP MODELING INPUT:
BYPASS HOURLY TIME STEP MODELING OUTPUT:
Flow Frequency Analysis
Time Series File:bypass.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
0.031 5 2/09/01 2:00
0.024 8 1/05/02 16:00
0.037 2 2/27/03 7:00
0.025 7 8/26/04 2:00
0.030 6 10/28/04 16:00
0.033 4 1/18/06 16:00
0.036 3 10/26/06 0:00
0.064 1 1/09/08 6:00
Computed Peaks
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
-----Flow Frequency Analysis-------
- -Peaks Rank Return Prob
(CFS) Period
0.064 1 100.00
0.037 2 25.00
0.036 3 10.00
0.033 4 5.00
0.031 5 3.00
0.030 6 2.00
0.025 7 1.30
0.024 8 1.10
0.055 50.00
Saddlebrook Preliminary Plat
0.990
0.960
0.900
0.800
0.667
0.500
0.231
0.091
0.980
Page 18
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FIGURE 6
POST DEVELOPMENT AREA MAP
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat Page 19
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
~
'«
i!: :g .....
[Z]
~
D
• • •
• • •
• • • • • •
• • • • • • • •
• • • • •
• • • • • • • • • •
• • • • • • •
• • • • tF?jfcrtl"" • • •
• • • • •
• • • • • • • • •
• • • • • • •
• • • • •
• • • • • • •
• • • • • •
AREA BREAKDOWN
TOTAL EXISTING SITE AREA:
TOTAL PROJECT AREA:
LOT AREA (COLLECTEO):
IMPERVIOUS:
TILL GRASS:
ROW AREA (COLLECTED):
IMPERVIOUS:
TILL GRASS:
mACT A AREA (COLLECTED):
IMPER VlOUS:
TILL GRASS:
BYPASS:
IMPERVIOUS:
TILL GRASS:
• • • •
•
189,797 S.F. (4.35 ACRES)
200,420 S.F. (4.60 ACRES)
135.063 S.F. (3.124 AC)
61,228 S.F. (1.405 AC) (45%)
51,840 S.F. (1.718 AC)
35,191 S.F. (0.808 AC)
35,191 S.F. (0.808 AC) o
20,747 S.F. (0.475 AC)
10,373 S.F. (0.238 AC)
10,374 S.F. (0.238 AC)
8,425 (0.193 AC)
3,935 (0.090 AC)
4,490 (0.103 AC)
LEGEND
em = "'" PROJECT BOUNDARY
~
~
'«
i!:
~ .....
NORTH
GRAPHIC SCALE
o 30 60 120 I . . (" .. 10., '¥. ",oO "F "I
1 INCH = 60 FT.
OJ
ill !II <5
ifi
~~
I!:s
OJ!!.l
o:~ ciS
....
~ >-
~ I I i. ~ ~h
~n !u
(I) i ~
m fi ~ ~ ~ 0 ~ I
a:: G
:51: 0 II.! ;;: ~ 5~~ ~ ~~~ jj:f :J: ~ :x:
Q:: ~ '« ~ a.: (j) i!: s:
!O • ~ 6l ~~ o Q.: co j;:;
o 9 ~rn a::: ~ ..... [t m ~
~
~
ORM7rn BY: CIM
O£SlGNED BY: IIAJ
PRO.£CT ENGINEER: IIAJ
DATE: 04».2tnR
PR()'£CT NO.: r2DfD
R: \2012\O\12040\3\Drowings\Plols\PP\Reporl F1gures\01-YlG612040.dwg 8/27/2012 II: 56: 56 AM PDT FlGUR£: 6 J
COPYRIGHT@2012. O.R. STRONG CONSULTING ENGINEERS INC.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PERFORMANCE STANDARDS (PART C)
The Project is required to adhere to Level 3 Flow Control criteria. The Level 3
performance criteria requires that the developed condition's durations must match the
predeveloped durations ranging from 50% of the two-year peak flow up to the full 50-
year peak flow and also match developed peak discharge rates to predeveloped peak
discharge rates for the 2-year, 10-year and 100-year return periods (KCSWDM, Sec.
1.2). The Project was evaluated for onsite infiltration and dispersion of roof downspout
runoff. The lots have insufficient space to allow for infiltration or dispersion of roof runoff
and will utilize the reduced impervious footprint BMP option.
The Basic Water Quality Treatment goal is to remove 80% of TSS for flows or volumes
up to and including the WQ design flow or volume.
Conveyance criteria for the Project require that all new pipes be designed to convey and
contain (at minimum) the 25-year peak flow. The conveyance system design will be
analyzed at time of final engineering.
FLOW CONTROL SYSTEM (PART D)
The Site will utilize a detention vault meeting the Level 3 Flow Control Criteria. The
King County Runoff Time Series (KCRTS) software was used to size the detention
facility. The detention vault design information is included in this section.
FLOW CONTROL BMP SELECTION
Subdivision projects are required to mitigate for impervious surface equal to a minimum
of 10% of each lot area by use of Flow Control Best Management Practices (BMP's).
The reduced Impervious Surface Credit BMP as described in Appendix C, Section C.2.9
of the KCSWDM will be utilized for the Project. The maximum impervious surface
coverage allowed per zoning code for the total lot area 55%. Lots 1-14 inclusive shall
be restricted to a maximum impervious coverage equal to 45% of each lot area. A
restricted footprint covenant shall be recorded on the face of the final plat map. This
satisfies the flow control BMP requirements in Section 1.2.3.3 and 5.2 of the 2009
KCSWDM.
©2012 D. R. STRONG Consulting Engineers Inc.
Technical1nformation Report
Saddlebrook Preliminary Plat Page 20
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I MAXIMUM ALLOWABLE RESTRICTED
LOTNO. LOT AREA I IMPERVIOUS AREA PER CODE IMPERVIOUS FOOTPRINT
1 10690 r S880 4811
2 9400 5170 4230
3 9400 5170 4230
4 9400 5170 4230
5 9400 5170 4230
6 9400 5170 4230 _.-
7 9400 5170 4230
8 11734 6454 5280
9 9445 5195 4250
10 9437 5190 4247
11 9429 5186 4243
12 9421 I 5182 4239
13 9413 I 5177
I
4236
14 10704 I 5887 4817 "._---_ .. _---.
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat Page 21
City of Renton
I
I
I
I
I
I
I
I
I
I
I .,
I
I
I
I
I
I
I
FLOW CONTROL FACILITY DESIGN OUTPUT
Retention/Detention Facility
Type of Facility:
Side Slope:
Pond Bottom Length:
Pond Bottom Width:
Pond Bottom Area:
Top Area at 1 ft. FB:
Effective Storage Depth:
Stage 0 Elevation:
Storage Volume:
Riser Head:
Riser Diameter:
Number of orifices:
Orifice # Height
(ft)
1 0.00
2 3.25
3 4.50
Detention Pond
3.00 H:IV
123.40 ft
61. 70 ft
7614. sq. ft
15573. sq. ft
0.358 acres
5.00 ft
490.00 ft
53451. cu. ft
1. 227 ac-ft
5.00
18.00
3
Diameter
(in)
1.10
2.30
2.19
ft
inches
Full Head
Discharge
(CFS)
0.073
0.190
0.092
Top Notch Weir: None
Outflow Rating Curve: None
Pipe
Diameter
(in)
6.0
6.0
Stage Elevation Storage Discharge Percolation
Area
(ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs)
0.00 490.00 O. 0.000 0.000 0.00
0.01 490.01 76. 0.002 0.003 0.00
0.02 490.02 153. 0.004 0.005 0.00
0.03 490.03 229. 0.005 0.006 0.00
0.05 490.05 382. 0.009 0.007 0.00
0.06 490.06 459. 0.011 0.008 0.00
0.07 490.07 536. 0.012 0.009 0.00
0.08 490.08 613. 0.014 0.009 0.00
0.09 490.09 690. 0.016 0.010 0.00
0.19 490.19 1467. 0.034 0.014 0.00
0.29 490.29 2255. 0.052 0.018 0.00
0.39 490.39 3055. 0.070 0.020 0.00
0.49 490.49 3865. 0.089 0.023 0.00
0.59 490.59 4688. 0.108 0.025 0.00
0.69 490.69 5522. 0.127 0.027 0.00
0.79 490.79 6367. 0.146 0.029 0.00
0.89 490.89 7225. 0.166 0.031 0.00
0.99 490.99 8093. 0.186 0.033 0.00
1. 09 491. 09 8974. 0.206 0.034 0.00
1.19 491.19 9867. 0.227 0.036 0.00
1. 29 491.29 10771. 0.247 0.037 0.00
1. 39 491. 39 11688. 0.268 0.039 0.00
1. 49 491. 49 12617. 0.290 0.040 0.00
©2012 D. R. STRONG Consulting Engineers Inc. Saddlebrook Preliminary Plat
Technical Information Report
Surf
(sq. ft)
7614.
7625.
7636.
7647.
7669.
7680.
7692.
7703.
7714 .
7826.
7939.
8052.
8166.
8281.
8397.
8513.
8631.
8748.
8867.
8986.
9106.
9227 .
9348.
Page 22
City of Renton
I
I 1. 59 491.59 13558. 0.311 0.041 0.00 9471.
1. 69 491.69 14511. 0.333 0.042 0.00 9593.
I 1. 79 491. 7 9 15477. 0.355 0.044 0.00 9717.
1. 89 491. 89 16454. 0.378 0.045 0.00 9841.
1. 99 491.99 17445. 0.400 0.046 0.00 9966.
I 2.09 492.09 18448. 0.424 0.047 0.00 10092.
2.19 492.19 19463. 0.447 0.048 0.00 10219.
2.29 492.29 20491. 0.470 0.049 0.00 10346.
2.39 492.39 21532. 0.494 0.050 0.00 10474.
I 2.49 492.49 22586. 0.519 0.052 0.00 10602.
2.59 492.59 23653. 0.543 0.053 0.00 10732.
2.69 492.69 24733. 0.568 0.054 0.00 10862.
2.79 492.79 25825. 0.593 0.055 0.00 10992.
I 2.89 492.89 26931. 0.618 0.056 0.00 11124.
2.99 492.99 28050. 0.644 0.056 0.00 11256.
3.09 493.09 29182. 0.670 0.057 0.00 11389.
I 3.19 493.19 30328. 0.696 0.058 0.00 11523.
3.25 493.25 31022. 0.7l2 0.059 0.00 11603.
3.27 493.27 31254. 0.717 0.060 0.00 11630.
3.30 493.30 31603. 0.726 0.065 0.00 11671.
I 3.32 493.32 ' 31837. 0.731 0.072 0.00 11698.
3.35 493.35 32189. 0.739 0.081 0.00 11738.
3.37 493.37 32424. 0.744 0.093 0.00 11765.
I
3.39 493.39 32659. 0.750 0.107 0.00 11792.
3.42 493.42 33014 . 0.758 0.119 0.00 11833.
3.44 493.44 33251. 0.763 0.123 0.00 11860.
3.54 493.54 34443. 0.791 0.139 0.00 11996.
I 3.64 493.64 35650. 0.818 0.152 0.00 12133.
3.74 493.74 36870. 0.846 0.164 0.00 12271.
3.84 493.84 38104. 0.875 0.174 0.00 12409.
3.94 493.94 39352. 0.903 0.184 0.00 12548.
I 4.04 494.04 40614. 0.932 0.193 0.00 12688.
4.14 494.14 41890. 0.962 0.202 0.00 12829.
4.24 494.24 43180. 0.991 0.210 0.00 12970.
I 4.34 494 . 34 44484. 1. 021 0.218 0.00 13112.
4.44 494 .44 45802. 1. 051 0.226 0.00 13254.
4.50 494 .50 46600. 1. 070 0.230 0.00 13340.
4.52 494.52 46867. 1. 076 0.233 0.00 13369.
I 4.55 494.55 47269. 1. 085 0.238 0.00 13412.
4.57 494.57 47537. 1. 091 0.246 0.00 13441.
4.59 494.59 47806. 1. 097 0.256 0.00 13470.
I 4.61 494.61 48076. 1.104 0.268 0.00 13499.
4.64 494.64 48481. 1.113 0.282 0.00 13542.
4.66 494.66 48753. 1.119 0.293 0.00 13571.
4.68 494.68 49024. 1.125 0.298 0.00 13600.
I 4.78 494.78 50392. 1.157 0.319 0.00 13745.
4.88 494 .88 51773. 1.189 0.336 0.00 13891.
4.98 494 . 98 53170. 1. 221 0.353 0.00 14037.
5.00 495.00 53451. 1. 227 0.355 0.00 14067.
I 5.10 495.10 54865. 1. 260 0.832 0.00 14214 .
5.20 495.20 56294. 1.292 1.690 0.00 14362.
5.30 495.30 57737. 1. 325 2.800 0.00 14511.
I 5.40 495.40 59196. 1.359 4.110 0.00 14661.
5.50 495.50 60669. 1. 393 5.590 0.00 14811.
5.60 495.60 62158. 1. 427 7.030 0.00 14962.
5.70 495.70 63662. 1.461 7.570 0.00 15114.
I 5.80 495.80 65181. 1. 496 8.070 0.00 15266.
©2012 D. R. STRONG Consulting Engineers Inc. Saddlebrook Preliminary Plat Page 23
Technical Information Report City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Hyd
1
2
3
4
5
6
7
8
Hyd
1
2
3
4
5
6
7
8
5.90 495.90
6.00 496.00
6.10 496.10
6.20 496.20
6.30 496.30
6.40 496.40
6.50 496.50
6.60 496.60
6.70 496.70
6.80 496.80
6.90 496.90
7.00 497.00
Inflow Outflow
1. 57 0.35
0.77 0.27
0.93 0.20
0.77 0.20
0.82 0.14
0.48 0.07
0.61 0.06
0.65 0.05
66715. 1. 532
68265. 1.567
69830. 1.603
71410. 1. 639
73006. 1. 676
74618. 1.713
76246. 1. 750
77889. 1.788
79548. 1.826
81223. 1. 865
82914 . 1. 903
84621. 1. 943
Peak
Stage
5.00
4.61
4.16
4.13
3.57
3.32
2.98
2.01
Elev
495.00
494.61
494.16
494.13
493.57
493.32
492.98
492.01
R/D Facility Tributary Reservoir
Outflow Inflow Inflow
0.35 0.06 ********
0.27 0.03 ********
0.20 0.04 ********
0.20 0.03 ********
0.14 0.03 ********
0.07 0.02 ********
0.06 0.02 ********
0.05 0.02 ********
Route Time Series through Facility
Inflow Time Series File:rdin.tsf
Outflow Time Series File:rdout
POC Time Series File:dsout
Inflow/Outflow Analysis
Peak Inflow Discharge: 1. 57 CFS
Peak Outflow Discharge: 0.355 CFS
Peak Reservoir Stage: 5.00 Ft
Peak Reservoir Elev: 495.00 Ft
8.540 0.00
8.990 0.00
9.410 0.00
9.820 0.00
10.210 0.00
10.590 0.00
10.950 0.00
11.300 0.00
11. 640 0.00
11. 970 0.00
12.290 0.00
12.600 0.00
Storage
(Cu-Ft) (Ac-Ft)
53448. 1.227
48051. 1.103
42110. 0.967
41822. 0.960
34772. 0.798
31889. 0.732
27883. 0.640
17649. 0.405
POC Outflow
Target Calc
0.37 0.37
******* 0.28
******* 0.21
******* 0.21
******* 0.15
******* 0.08
******* 0.07
******* 0.07
at 6:00 on Jan 9 in
at 11: 00 on Jan 9 in
Peak Reservoir Storage: 53448. Cu-Ft
1.227 Ac-Ft
Add Time Series:bypass.tsf
15419.
15573.
15728.
15883.
16039.
16196 .
16354.
16512.
16671.
16830.
16991.
17152.
Year 8
Year 8
Peak Summed Discharge: 0.371 CFS at 10:00 on Jan 9 in Year 8
Point of Compliance File:dsout.tsf
Flow Frequency Analysis
Time Series File:rdout.tsf
Project Location:Sea-Tac
©2012 D. R. STRONG Consulting Engineers Inc.
Technicallnfonnation Report
Saddlebrook Preliminary Plat Page 24
City of Renton
I
I
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
I Flow Rate Rank Time of Peak - -Peaks - -Rank Return Prob
(CFS) (CFS) (ft) Period
0.285 2 2/09/01 20:00 0.355 5.00 1 100.00 0.990
I 0.056 7 1/07/02 4:00 0.285 4.64 2 25.00 0.960
0.203 3 3/06/03 22:00 0.203 4.16 3 10.00 0.900
0.046 8 8/26/04 8:00 0.202 4.13 4 5.00 0.800
0.073 6 1/08/05 3:00 0.143 3.57 5 3.00 0.667
I 0.143 5 1/19/06 0:00 0.073 3.32 6 2.00 0.500
0.202 4 11/24/06 8:00 0.056 2.97 7 1. 30 0.231
0.355 1 1/09/08 11: 00 0.046 2.01 8 1.10 0.091
I computed Peaks 0.332 4.85 50.00 0.980
Flow Frequency Analysis
Time Series File:dsout.tsf
I
Project Location:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak -Peaks Rank Return Prob
I (CFS) (CFS) Period
0.296 2 2/09/01 20:00. 0.37l 1 100.00 0.990
0.07l 7 1/05/02 16:00 0.296 2 25.00 0.960
I 0.213 3 3/06/03 19:00 0.213 3 10.00 0.900
0.066 8 8/26/04 2:00 0.212 4 5.00 0.800
0.076 6 1/08/05 3:00 0.150 5 3.00 0.667
0.150 5 1119/06 0:00 0.076 6 2.00 0.500
I 0.212 4 11/24/06 6:00 0.07l 7 1. 30 0.231
0.37l 1 1/09/08 10:00 0.066 8 1.10 0.091
Computed Peaks 0.346 50.00 0.980
I Flow Duration from Time Series File:rdout.tsf
Cutoff Count Frequency CDF Exceedence Probability
CFS % % %
I 0.004 32147 52.425 52.425 47.575 0.476E+00
0.012 6957 11.345 63.770 36.230 0.362E+00
0.020 6220 10.144 73.914 26.086 0.261E+00
I 0.028 5093 8.306 82.220 17.780 0.178E+00
0.036 4537 7.399 89.618 10.382 0.104E+00
0.044 2617 4.268 93.886 6.114 0.611E-01
0.052 1897 3.094 96.980 3.020 0.302E-01
I 0.060 1460 2.381 99.361 0.639 0.639E-02
0.068 53 0.086 99.447 0.553 0.553E-02
0.076 38 0.062 99.509 0.491 0.491E-02
I 0.084 26 0.042 99.552 0.448 0.448E-02
0.092 15 0.024 99.576 0.424 0.424E-02
0.100 8 0.013 99.589 0.411 0.411E-02
I 0.108 13 0.021 99.610 0.390 0.390E-02
0.116 12 0.020 99.630 0.370 0.370E-02
0.124 20 0.033 99.662 0.338 0.338E-02
0.132 34 0.055 99.7l8 0.282 0.282E-02
I 0.140 22 0.036 99.754 0.246 0.246E-02
0.148 26 0.042 99.796 0.204 0.204E-02
0.156 17 0.028 99.824 0.176 0.176E-02
I 0.164 9 0.015 99.839 0.161 0.161E-02
©2012 D. R STRONG Consulting Engineers Inc. Saddle brook Preliminary Plat Page 25
Technical Information Report City of Renton
I
I
I 0.172 15 0.024 99.863 0.137 0.137E-02
0.180 13 0.021 99.884 0.116 o . 116E-02
I 0.188 9 0.015 99.899 0.101 0.101E-02
0.196 13 0.021 99.920 0.080 0.799E-03
0.204 19 0.031 99.951 0.049 0.489E-03
I 0.212 11 0.018 99.969 0.031 0.310E-03
0.220 4 0.007 99.976 0.024 0.245E-03
0.228 4 0.007 99.982 0.018 0.179E-03
0.236 4 0.007 99.989 0.011 o .114E-03
I 0.244 2 0.003 99.992 0.008 0.815E-04
0.252 0 0.000 99.992 0.008 0.815E-04
0.260 1 0.002 99.993 0.007 0.652E-04
I 0.268 0 0.000 99.993 0.007 0.652E-04
0.276 2 0.003 99.997 0.003 0.326E-04
0.284 1 0.002 99.998 0.002 0.163E-04
I Flow Duration from Time Series File:dsout.tsf
Cutoff Count Frequency CDF Exceedence Probability
CFS % % %
I 0.004 32207 52.523 52.523 47.477 0.475E+00
0.013 6975 11.375 63.898 36.102 .0.361E+00
0.021 6155 10.038 73.935 26.065 0.261E+00
I 0.029 5108 8.330 82.265 17.735 0.177E+00
0.037 4656 7.593 89.858 10.142 0.101E+00
0.046 2506 4.087 93.945 6.055 0.606E-01
0.054 1832 2.988 96.932 3.068 0.307E-01
I 0.062 1360 2.218 99.150 0.850 0.850E-02
0.071 151 0.246 99.397 0.603 0.603E-02
0.079 60 0.098 99.494 0.506 0.506E-02
I 0.087 31 0.051 99.545 0.455 0.455E-02
0.096 19 0.031 99.576 0.424 0.424E-02
0.104 8 0.013 99.589 0.411 0.411E-02
0.112 13 0.021 99.610 0.390 0.390E-02
I 0.121 14 0.023 99.633 0.367 0.367E-02
0.129 21 0.034 99.667 0.333 0.333E-02
0.137 29 0.047 99.715 0.285 0.285E-02
I 0.146 23 0.038 99.752 0.248 0.248E-02
0.154 26 0.042 99.795 0.205 0.205E-02
0.162 17 0.028 99.822 0.178 0.178E-02
0.170 9 0.015 99.837 0.163 0.163E-02
I 0.179 14 0.023 99.860 0.140 0.140E-02
0.187 13 0.021 99.881 0.119 o .119E-02
0.195 12 0.020 99.901 0.099 0.995E-03
I 0.204 10 0.016 99.917 0.083 0.832E-03
0.212 16 0.026 99.943 0.057 0.571E-03
0.220 12 0.020 99.962 0.038 0.375E-03
I 0.229 7 0.011 99.974 0.026 0.261E-03
0.237 5 0.008 99.982 0.018 0.179E-03
0.245 3 0.005 99.987 0.013 0.130E-03
0.254 2 0.003 99.990 0.010 0.978E-04
I 0.262 1 0.002 99.992 0.008 0.815E-04
0.270 1 0.002 99.993 0.007 0.652E-04
0.279 1 0.002 99.995 0.005 0.489E-04
I 0.287 0 0.000 99.995 0.005 0.489E-04
©2012 D. R. STRONG Consulting Engineers Inc. Saddlebrook Preliminary Plat Page 26
Technical Information Report City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
'.
I
I
I
0.295 2 0.003 99.998 0.002 0.163E-04
Duration Comparison Anaylsis
Base _File: predev.tsf
New File: dsout. tsf
Cutoff Units: Discharge in CFS
-----Fraction of Time--------------Check of Tolerance-------
Cutoff Base New %Change Probability
0.064 0.95E-02 0.77E-02 -19.0 I 0.95E-02
0.081 0.63E-02 0.49E-02 -22.3 I 0.63E-02
0.098 0.50E-02 0.42E-02 -15.8 I 0.50E-02
0.116 0.37E-02 0.38E-02 2.6 I 0.37E-02
0.133 0.29E-02 0.30E-02 6.9 I 0.29E-02
0.151 0.22E-02 0.22E-02 -2.2 I 0.22E-02
0.168 0.15E-02 0.17E-02 14.4 I 0.15E-02
0.185 0.10E-02 0.12E-02 21. 0 I 0.10E-02
0.203 0.62E-03 0.86E-03 39.5 I 0.62E-03
0.220 0.34E-03 0.38E-03 9.5 I 0.34E-03
0.238 0.21E-03 0.18E-03 -15.4 I 0.21E-03
0.255 o . 16E-03 0.98E-04 -40.0 I 0.16E-03
0.272 o . 11E-03 0.65E-04 -42.9 I o .l1E-03
0.290 0.16E-04 0.16E-04 0.0 I 0.16E-04
Maximum positive excursion = 0.014 cfs ( 7.5%)
occurring at 0.189 cfs on the Base Data:predev.tsf
and at 0.203 cfs on the New Data:dsout.tsf
Maximum negative excursion = 0.018 cfs (-18.6%)
occurring at 0.098 cfs on the Base Data:predev.tsf
and at 0.080 cfs on the New Data:dsout.tsf
and at 0.206 cfs on the New Data:dsout.tsf
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat
Base New
0.064 0.061
0.081 0.069
0.098 0.080
0.116 0.119
0.133 0.138
0.151 0.150
0.168 0.177
0.185 0.195
0.203 0.210
0.220 0.221
0.238 0.234
0.255 0.242
0.272 0.249
0.290 0.296
%Change
-3.7
-14.9
-18.6
3.0
3.3
-0.5
5.2
5.3
3.8
0.2
-1. 6
-5.1
-8.6
2.1
Page 27
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PEAK PLOT
lep;m:.;!:!~~ f',!~~~~~,RTi¥:.~"-;-=~~.:;~~~f!c:~---~":2:i::~±""/~'~_~_.0....t:1~~~':::.~~ i·:.~~iSW -! -.Aih!l£0~:~q,4-':'1!.:~:"~~~t~~':'::":_~~1
Retum Period '
2 5 10 ~ ~ 100
I n
II ~ I~
j
dl
o rdout.pks in SEi&-Tee
• dsout pks
<) pr",d<;ovpks
R
'"
0
, ,
0 • •
",.~-------------------------------------------------------------------------------
0 • •
0 00
"'':1--------------------------------------------
o
"''-'---~------"------~-----:.,------."----~--~--.,,...--....,,.----~-----:.,------~----~--~
, 2 10 20 30 "0 50 60 70 80 00 filS 98 ~
CtmuIa\Ne Prool!lbliity
DURATION ANALYSIS
N ~
0
!-
~
N
0
• N ~
0
0
N
'" ~
Ii> 0
!;].
J ~
0
~
0
1l
0
~
l!
0
,
i i i i i i Iii i i i
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
i
,~
" \" ~
i i iii i i i i i i Iii i
Probability Exceedence
Saddlebrook Preliminary Plat
--
i i , i t I i I
_,..; ":'"0
rdOl1_dur o
dsOlt du'"
target au-
~
i i i , i i, i ,,"
Page 28
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
WATER QUALITY TREATMENT SYSTEM (PART E)
The Project is located in the Basic Water Quality Treatment area. The treatment goal is
80% removal of total suspend solids for a typical rainfall year, assuming typical pollutant
concentrations in urban runoff.
A combined detentionlwater quality pond will accommodate this requirement.
Rainfall (R) of the mean annual storm = 0.47 in. From KCSWDM Fig. 6.4.1.A
Area of impervious surface (Ai) = 106,793 s.f.
Area of till soil covered with till grass (Atg) = 85,208 s.f.
Area of till soil covered with till forest (Atf) = 0 s.f.
Area of outwash soil covered with grass or forest (Ao) = 0 s.f.
Volume factor (I) = 3 N/A From KCSWDM Sec. 6.4.1.1
Calculations Units Notes
Volume of runoff from mean annual storm (Vr) -4598.782 c.f. -(O.9Ai oj. O.25Atg oj. O.10Atf oj. O.01Ao) • R/12
Minimum Wetpool volume required (Vb) = 13,796 c.f. =1· Vr
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat Page 29
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FIGURE 7
DETENTION & WATER QUALITY FACILITY DETAILS
This will be provided at time of final engineering.
©2012 D. R. STRONG Consulting Engineers Inc.
Technicallnforrnation Report
Saddlebrook Preliminary Plat Page 30
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SECTION V
CONVEYANCE SYSTEM ANALYSIS AND DESIGN
Per C.R. #4 of the KCSWDM, the conveyance system must be analyzed and designed
for existing tributary and developed onsite runoff from the proposed project. Pipe
systems shall be designed to convey the 100-year design storm. The Rational Method
will be used to calculate the Q-Ratio for each pipe node.
A conveyance system consisting primarily of pipes and catch basins has been designed
for the Project. Onsite runoff will be collected by the multiple catch basins. Pipes are
typically twelve-inch diameter LCPE material. The pipes will have a minimum slope of
0.50%.
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat Page 31
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BACKWATER ANALYSIS
A backwater analysis will be provided at time of final engineering.
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat Page 32
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SECTION VI
SPECIAL REPORTS AND STUDIES
The following report and studies have been provided with this submittal.
1. Traffic Impact Analysis -TraffEx, Inc. August 10, 2012
2. Critical Areas Study -Sewall Wetland Consulting, Inc. August 20,2012
3. Geotechnical Engineering Study -Earth Solutions NW LLC, August 21,2012.
4. Arborist Report -GreenForest, Inc. August 27,2012.
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat Page 33
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SECTION VII
OTHER PERMITS, VARIANCES AND ADJUSTMENTS
Approved Drainage Adjustment 2012-03 (See Appendix A)
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat Page 34
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SECTION VIII
ESC PLAN ANALYSIS AND DESIGN (PART A)
The Erosion and Sedimentation Control Design meets the nine minimum requirements:
1. Clearing Limits -Areas to remain undisturbed shall be delineated with a high-
visibility plastic fence prior to any site clearing or grading.
2. Cover Measures -Disturbed Site areas shall be covered with mulch and
seeded, as appropriate, for temporary or permanent measures.
3. Perimeter protection -Perimeter protection shall consist of a silt fence down
slope of any disturbed areas or stockpiles.
4. Traffic Area Stabilization - A stabilized construction entrance will be located at
the point of ingress/egress.
5. Sediment Retention -Surface water collected from disturbed areas of the Site
shall be routed through a sediment vault or sediment traps prior to release
from the Site. The sediment vault or traps will be installed prior to grading of
any contributing area. .
6. Surface Water Control -Interceptor berms or swales shall be installed to control
and intercept all surface water from disturbed areas. Surface water controls
shall be installed concurrently with and/or immediately following rough
grading.
7. Dewatering Control-Will be provided as needed.
8. Dust Control -Dust control shall be provided by spraying exposed soils with
water until wet. This is required when exposed soils are dry to the point that
wind transport is possible which would impact roadways, drainage ways,
surface waters, or neighboring residences.
9. Flow Control -Runoff collected in the sediment vault will discharge to the
permanent detention vault outfall system.
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat Page 35
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SWPPS PLAN DESIGN (PART B)
Construction activities that could contribute pollutants to surface and storm water
include the follciwing, with applicable BMP's listed for each item:
1. Storage and use of chemicals: Utilize source control, and soil erosion and
sedimentation control practices, such as using only recommended amounts of
chemical materials applied in the proper manner; neutralizing concrete wash
water, and disposing of excess concrete material only in areas prepared for
concrete placement, or return to batch plant; disposing of wash-up waters from
water-based paints in sanitary sewer; disposing of wastes from oil-based paints,
solvents, thinners, and mineral spirits only through a licensed waste
management firm, or treatment, storage, and disposal (TSD) facility.
2. Material delivery and storage: Locate temporary storage areas away from
vehicular traffic, near the construction entrance, and away from storm drains.
Material Safety Data Sheets (MSDS) should be supplied for all materials stored,
and chemicals kept in their original labeled containers. Maintenance, fueling,
and repair of heavy equipment and vehicles shall be conducted using spill
prevention and control measures. Contaminated surfaces shall be cleaned
immediately following any spill incident. Provide cover, containment, and
protection from vandalism for all chemicals, liquid products, petroleum products,
and other potentially hazardous materials.
3. Building demolition: Protect stormwater drainage system from sediment-laden
runoff and loose particles. To the extent possible, use dikes, berms, or other
methods to protect overland discharge paths from runoff. Street gutter,
sidewalks, driveways, and other paved surfaces in the immediate area of
demolition must be swept daily to collect and properly dispose of loose debris
and garbage. Spray the minimum amount of water to help control windblown fine
particles such as concrete, dust, and paint chips. Avoid excessive spraying so
that runoff from the site does not occur, yet dust control is achieved. Oils must
never be used for dust control.
. 4. Sawcutting: Slurry and cuttings shall be vacuumed during the activity to prevent
migration offsite and must not remain on permanent concrete or asphalt paving
overnight. Collected slurry and cuttings shall be disposed of in a manner that
does not violate ground water or surface water quality standards.
The complete CSWPPP will be submitted at the time of final engineering.
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat Page 36
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SECTION IX
BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT
1. Bond Quantity Worksheet -will be submitted at final engineering
2. The Stormwater Facility Summary Sheet is included in this section
3. Declaration of Covenant-will be provided prior to final engineering approval.
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat Page 37
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
STORMWATER FACILITY SUMMARY SHEET
Development, __ -""S""ad""d""I"'e""b""'roo<:o,.,k"--____ Date August 27. 2012
Location 13426 156th Avenue SE. Renton. Washington
ENGINEER
Name Maher A. Joudi, P.E.
Firm D. R. STRONG Consulting
Engineers, Inc.
Address 10604 NE 38'" Place, #101
Kirkland, WA 98033
Phone (425) 827-3063
Developed Site: 4.60 acres
Number of lots 14
Number of detention facilities on site:
_-:-_vaults
_...J1,--pond
DEVELOPER
Name
Firm PNW Holdings LLC
Address 9675 SE 36'n Street, #105
Mercer Island, WA 98040
Phone (206) 588-1147
Number of infiltration facilities on site:
___ vaults
___ vaults
___ tanks _--,-_tanks
Flow control provided in regional facility (give
location),_-:--:--_-:---:-_--=::--_-::-__ -:--
No flow control required, ___ Exemption number
D ownstream D . ralnage B . asms
Immediate Major Basin
Basin Lower Cedar River Cedar River
Number & type of water quality facilities on site:
biofiltration swale (regular/wet! or continuous inflow?)
.,------",-sand filter (basic or large?) ___ sand filter, linear (basic or
large?) ___ CONTECH Stormfilter
_-:-:-_combined detentionNVQ vault ___ sand filter vault (basic or large?)
X combined detention/wetpond ___ stormwater wetland
___ compost filter ___ wetvault (basic or large?)
___ filter strip ___ Wetvault
___ flow dispersion ___ pre-settling pond
___ farm management plan ___ flow-splitter catchbasin
___ landscape management plan
___ oil/water separator (baffle or coalescing plate?)
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddle brook Preliminary Plat Page 38
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.,..,-_,-catch basin inserts:
Manufacturer-:-:::-_,-----,--______________ _
-;--;-----,;-pre-settling structure:
Manufacturer __________________ _
DESIGN INFORMATION INDIVIDUAL BASIN
Water Quality design flow
Water Quality treated volume
Drainage basin(s)
Onsite area (inlcudes frontage) 4.60
Offsite area
Type of StoraQe Facility Vault
Live Storage Volume (ree uired) 62,622
Predev Runoff Rate 2-year 0.128 . 10-year 0.223
100-year 0.371
Developed Runoff Rate 2-year 0.799
(includes bypass) 10-year 0.964
100-year 1.634
Type of Restrictor Frop-Tee
Size of orifice/restriction No.1 0.96
No.2 1.91
NO.3 2.22
©2012 O. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddtebrook Preliminary Plat Page 39
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SECTION X
OPERATIONS AND MAINTENANCE MANUAL
Excerpts from the 2009 KCSWDM will be provided at final engineering.
©2012 D. R. STRONG Consulting Engineers Inc.
Technicallnfonnation Report
Saddlebrook Preliminary Plat Page 40
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
APPENDICES
Saddlebrook Preliminary Plat Page 41
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
APPENDIX "A" ADJUSTMENT 2012-03
©2012 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Preliminary Plat Page 42
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PUBLIC WORKS DEPARTMENT
M E M 0 RAN DUM
DATE: August 16 , 2012
TO: "J Arneta Henninger, Plan Reviewer
FROM: U~-Ron Straka, Surface Water Utility Supervisor, x7248
STAFF CONTACT: Hebe Bernardo, Surface Water Utility Engineer, x7264
SUBJECT: SadlUebroolt Plat Adjustment 2012-03
The City of Renton Surface Water Utility has completed review of the adjustment
request for the Saddlebrook Plat in accordance with City adopted 2009 King County
surface Water Design Manual (KCSWDM) and City Amendments tl) the 2009 KCSWDM.
Our review of the information leads us to understand that the applicant's engineering is
requesting an adjustment from the 2009 King County Surface Water Design Manual to
core requirement #1 (section 1.2.1), Discharge at the Natural Location. Our review of
the Information provided by the applicant engineer on August 13, 2012, provides the
following findings:
1. The proposed project has not completed the process preliminary plat approval
or SEPA review.
2. The site is located in two existing parcels (3664500260 and 3664500261) with a
total area of 4.36 acers. Parcels are situated atop a ridge and discharges
runoff into two subbasins. Tributary Drainage Area (TDA) West is
approximately 1.78 acres and discharges to 156th Avenue SE while TDA East is
comprised of the remaining 2.58 acres and discharges to 158th Avenue SE.
The discharge elevation of TDA West Is approximately six feet lower than that of
TDA East. These two flowpaths converge at a point approximately 3,000 feet
downstream of TDA West and 4,900 feet downstream ofTDA East at the
corner of 156th Avenue SE and SE 144th Street (convergence point).
3. The proposal is to collect much of the runoff from the project site (4.36 acres)
and direct it to a single combined detention and water quality facility located in
the west portion of the site. The allowed release would then discharge through
an existing conveyance system into the right-of-way of 156th Avenue SE where it
continues to go south and converges with TDA East in SE 144th Street.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Jan lilian
Page 20f4
August 16, 2012
4. No downstream analysis has been completed and submitted to the City for
review. However, a preliminary field recognizance of the downstream drainage
system was completed by the applicant and applicant's engineer. Findings were
discussed in the adjustment letter. Preliminary analysis demonstrated that the
downstream path from TDA West is mostly comprised of a constructed
conveyance system from the site to the convergence point. This conveyance
system is made up of grass and rock-lined ditches as well as culverts, pipes,
and catch basins.
5. King County drainage complaints in the area were reviewed and the basin
draining to the conveyance system was determined using King County
iMAP. This resource review revealed an overall basin size of approximately
73.5 acres and no relevant drainage complaints in the last 15 years
downstream ofthe Site.
6. To analyze the Impact of the discharge· rate, the King County Runoff Time
Series Software was used to examine the overall site In a forested condition,
TDA West's existing condition, and the 73.5 acre basin in a forested condition as
well as a full build-out condition (undetalned,based on KCSWDM Table
3.2.2.0 for 4.0 DU/GA, 42% impervious). TDA West (in its existing condition)
generates approximately 0.29 cfs of runoff for the 100-year return interval.
The total site, when analyzed for the forested condition, will generate
approximately 0.35 cfs of runoff for the 100-year return interval. The existing
conveyance system downstream of the proposed plat would receive a net
increase in runoff of 0.06 cfs, which is less than 0.1 cfs. The total drainage
basin currently generates 5.93 cfs and 23.59 cfs, for forested and build-out
conditions assuming no flow control, respectively.
Based on these understandings, findings, and per section 1.2.1 of the 2009 Surface
Water Design Manual as amended by the City, the adjustment to allow the diversion of
runoff to a single combined stormwater flow control and water quality treatment facility
draining ~o SE 156th Avenue Is approved with the following conditions:
1. A level one downstream analysis in accordance with section 1.2.1 ofthe 2009
KCSWDM as amended by the City shall be submitted to the City for review.
Based on this analysis, the City may require the completion of a downstream
analysis and/or improvements to the downstream system.
H;\Flle Sys\SWP -Surface Water ProJects\SWP-27 -Surface Water Projects (CIP)\27-3129 Renton Stormwater
Manual\ADJUSTMENTS\2012\2012-3 Saddlebrook.doc\HBah
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Jan lilian
Page 3 of4
August 15, 2012
2. The proposed combined detention and water quality treatment facility to be
constructed on the northwest corner of the site shall be designed as a level 3
flow control for the entire site In using the two basins as the existing (forested)
site conditions. The stormwater facility shall be designed In accordance with
section 1.2.3 of the 2009 KCSWDM.
3. Surface water discharge from the west basin is required to follow Its existing
drainage course.
4. Water quality treatment in accordance with section 1.2.8 of the 2009 KCSWDM
shall be provided for all targeted surfaces prior to discharging from the site. The
water quality facility shall be sized based on the entire proposed subdivision
draining to the facility Including any required frontage Improvements.
5. The release rate from the detention facility will be based on ail of the tributary
area being directed to the facility.
6. The volume of the stormwater detention facility shall be based on ail flows
directed to the facility at full development under current zoning. The detention
volume shall be sized using Level 3 Flood Problem Flow Control Standards In the
2009 KCSWDM. The pre-developed condition runoff rates for the sizing of the
facility shall be based on the entire site using forested as pre-developed site
conditions. The TIR shall include ail required documentation detailed in chapter
2 of the 2009 KCSWDM for the sizing of the facility.
7. Additional storm drainage requirements identified by the City cif Renton as part
of the SEPA review process or preliminary plat approval may apply to this
project. Please note that the approval of this adjustment does not relieve the
applicant from other conditions that may be stipulated in future city, state, or
federal permits/requirements.
Notes to applicant:
1. Ali lots within the Saddlebrook Plat are required to provide flow control BMPs In
accordance with figure C.1.3.A of the 2009 KCSWDM. Flow control BMP credits
In accordance with section 1.2.3 of the 2005 KCSWDM may be used to reduce
the size of the required flow control facility. The feasibility to implement full
dispersion BMPs and full infiltration BMPs shall be verified first. If
implementation of fulrdisperslon BMPs and full infiltration BMPS are not
feasible alternatives, then any of the BMPs listed In figure C.1.3.A shall be
provided. The selected flow control BMP to be implemented on each lot shall be
shown on the construction plans. Drainage calculations for the sizing of the
proposed BMPs to be constructed on each lot shall be included in the TIR.
H:\File Sys\SWP -Surface Water ProJects\SWP·27 -Surface Water Projects (CIP)\27-3129 Renton Stormwater
Manual\ADJUSTMENTS\201Z\201Z-3 Saddlebrook.doc\HBah
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Jan lilian
Page 4 of 4
August 16, 2012
Construction of the proposed flow control BMPs may be differed for
construction on the lot at time of building permit.
If you have any questions about this adjustment, please contact Hebe Bernardo or me.
Attachments
cc: lys Hornsby, P.E., Utility Systems Director
Kayren Kittrick, Development Engineering Supervisor
Vanessa Oolbee, Planner
File
H:\FJle Sys\SWP -Surface Water ProJects\SWP-27 -Surface Water Projects (CIP)\27-3129 Renton Stormwater
Manual\ADJUSTMENTS\2012\2012-3Saddlebrook.doc\HBah
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I'
I
D. R. STRONG
CONSUL liNG ENGINEERS
August 13.2012
Project No. 12040
City of Renton Development Services
1055 South Grady Way
Renton Washington 98057
Re: Saddlebrook. PRE12·050
Surface Water Design Manual Standards Adjustment Request
To whom it may concern:
We are writing to formally request approval for an adjustment from the 2009 King County
Surface Water Design Manual and City of Renton Amendments (KCSWDM) for the proposed
Saddlebrook Subdivision (Project). The requested adjustment. if approved. will result in one
City of Renton maintained detentionfwetpond facility (Facility). located at the southwestern
corner of the site. serving the two Threshold Discharge Areas (TDA).
Background
The 4.36 acre parcel is situated atop a ridge and discharges runoff into two subbasins. TDA
West is approximately 1.78 acres and discharges to 1561h Avenue SE while TDA East is
comprised of the remaining 2.58 acres and discharges to 15810 Avenue SE. The discharge
elevation of TDA West is approximately six feet lower than that of TDA East. These two
flowpaths converge at a point approximately 3.000 feet downstream of TDA West and 4.900
feet downstream of TDA East at the corner of 15610 Avenue SE and SE 1441h Street
(convergence point).
Adjustment Requested
KCSWDM 1.2.1: Core Requirement #1: Discharge at Nalural Location
All surface and storm waler runoff from a project must be discharged at the
naturat location so as not to be diverted onto or away from downstream
propertIes. The manner In which runoff Is discharged from the project slle must
not create a significant adverse Impact to downhill properties for drainage
systems.
Intent: To prevenl adverse impacts to downstream properties caused by
diversion of flow from one (towpath to another and to discharge In a manner that
does not significantly Impact downhill properties or drainage systems. Diversions
can cause greater impacts (from greater runoff volumes) than would otherwise
occilr from new development discharging runoff at the natural location.
Diversio!ls can atso Impact properties Ihat rely on runoff water 10 replenish wells
and ornamental and fish ponds.
The adjustment requested will require diverting runoff from TDA East (2.58
acres) to TDA West and utilizing one detention facility designed to meet Level 3
flow control criteria.
10004 N.E. 3S!rl Place
Suite 232
K(rkland, WA98033·3063
Phone; (425) 827·3003
Fax: (425) 827·2423
Toll Free: (BOO) 962·1402
wWW,dtstrong.oom
EngIneers Surveyors Landscape Architects
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
City of Renton Development Services
August 13. 2012
Page 2 of 3
Justification
The City of Renton Amendments to the SWDM Section 1.4.3 states that approval of
adjustments is based on the following criteria:
1. The request produces a compensating or comparable result that is in the public interest,
AND
2. Meets the objectives of safety, function, appearance, environmental protection, and
maintainability based on sound engineering judgment.
In general, combining drainage facilities where possible allows for land area to be utilized as
usable space rather than encumbering that land with utilities. One facility can meet the same
objectives of safety, function, appearance, environmental protection and maintainability
provided that no drainage problems are exacerbated or created in either basin.
Field reconnaissance and document research reveals that the downstream path from TDA
West is mostly comprised of a man-made conveyance system from the site to the convergence
point. This conveyance system is made up of grass and rock-lined ditches as well as culverts,
pipes and catch basins. It does not appear that there are any man-made or natural features
such as ponds or natural wetlands that rely on upstream runoff for sustainability. It appears
that allowance to divert runoff away from TDA East would meet the City of Renton criteria for
approval of drainage adjustments. .
In analyzing the potential impacts to the conveyance system in 156th Avenue SE (discharge
location for TDA West) caused by diverting runoff from TDA East, the conveyance system from
the site to the convergence point was observed. King County drainage complaints in the area
were reviewed and the basin draining to the conveyance system was determined using King
County iMAP. This resource review revealed an overall basin size of approximately 73.5 acres
and no relevant drainage complaints in the last 15 years downstream of the Site.
The downstream path from TDA West to the convergence point is fully comprised of a man-
made conveyance system made up of grass and rock-lined ditches as well as culverts, pipes
. and catch basins. Therefore, the diversion of volume of runoff is a negligible Impact; more
important is the rate at which runoff discharges from the site. To analyze the impact of the
discharge rate, the King County Runoff Time Series Software was used to examine the overall
site in a forested condition, TDA West's existing condition, and the 73.5 acre basin in a
forested condition as well as a full bUild-out condition (undetained, based on KCSWDM Table
3.2.2.0 for 4.0 DU/GA, 42% impervious). Analysis of the basin in a forested condition is an
ultra-conservative approach assuming all existing and fulure build-out would be detained 10
Level 3 flow control standards, while the laller scenario would assume full build-out with no
detention.
TDA West (in its existing condition) generates approximately 0.29. cIs of runoff for the 1 ~O-year
return Interval. The total site, when analyzed lor the forested condition, will generate
approximately 0.35 cIs of runoff for the 1 DO-year return interval and the total drainage basin
currently generates 5.93 cfs and 23.59 cfs, for forested and build-oul conditions, respectively.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
,I
I
I
•
I
City of Renton Development Services
AugUS113,2012
Page 3 of 3
The proposal to adhere to Level 3 flow control criteria would limit the discharge from the
Facility to match the predeveloped forested condition for the site thus limiting the maximum
peak discharge to 0.35 cfs. Therefore, it appears that the conveyance system would see a net
increase in runoff of 0.06 cfs. This equates to a maximum one-percent (1%) increase in
. discharge rate to the receiving conveyance system when compared to a forested basin and
0.25 percent (0.25%) increase when compared to flill bllild-out (undetained). It is important to
note that given the current limited bllild-out, the existing undetained impervious surfaces and
the likelihood that the future developments will be required to adhere to Level Two flow control
criteria, it would be safe to assume that the actual basin runoff is somewhere between the two
land-use coverage scenatios.
Given the lack of known drainage complaints along the downstream path coupled with
increased flow control and a negligible increase in discharge rate, it appears that approval to
divert runoff to TDA West would rneet the City of Renton criteria for approval of drainage
adjustments. The proposal provides a comparable result that is in the public interest as well
meets· the objectives of safety, function, appearance, environmental protection, and
maintainability based on sound engineering judgment.
Thank you for your time and consideration in this matter. If you have any questions or
concerns with regard to this matter, please do not hesitate to contact me.
Sincerely yours,
D. R. STRO('? Consulting Engineers Inc.
~ )f;;;-("" / ('
Maher A.I Joj, P.E.
Senior p~;~ngineer, Vice President
MAJ
Enlcosures: KCRTS .Land Use Input and Modeling Output
Basin Boundary Map
Site Plan
cc: Hebe Bernardo, via email
Arneta Henninger, via email
Justin Lagers, via email
R:12012101 12040\3\DocumentsIDrelnBge AdjustmentlL 120813_Dr81n8geAdjllstmentdocK
I
I
156TH AVE S£ (VE:STA AVE NE)
.--.~--' -" ..•. ,. .'~ -.. -.-' .....-----_. ", I
I
I
I
~ I
~ I §Q~
~~ I t::)J: r---C! mi I :::at:
c)'" ~ I a~ ~'" ,..
)Ii I it
I
I
I
I
I
I
I
1
j ,
I !\:l~@ n I. • I» -n ' -I -• I
,I
~! pm ,I , ~H~~
~ in
!
,', .-~~'-----:=~_~---~-::~lf-: ;-~~-~:.~~~
-, 11,$1' .!~ ! 1«".., ,1J.r
r------, ":. ~ r------1
I ",i3 I , ~~<o I I ~.;: I
~ I , I • I ~~O:I I .~
--I-n" I ~ ~"
\
, ~ , I I
I I
,
I I I
L_ --TJm'--~ L J
! I"
-,,...-
r -, --,
I I
r 1
, "'': I' I I I
l I t::~-• Q'':
I ~"Q I .. I ~S" I •
I
, I I ~" I •
I I
, I
L __ ~,--..J L __ ,rrl~ __ ..J !
r -, ,
I I I r -, .II
I $;)l! I • I I
~~-P~
~ I ~.-I .. , , I ~S I • .. ' 0\ -I 5 ..
I -, I I I ~~
L._ -nm·--.....i
I I
--, ,..-;
I 1
I I I r 1
, I "'-': I • I I
~~-
p-
~ I '. '" I .. • I ~8 I \~
i
0, I I .. , ~. '" I
I
, I
L_--nm--"';
I
L __ nrlr __ ..J
I _I I r --1
• I 1:)': I • I I
.. ~1s-.. ~.~~
I ~" t., i • I I •
I
,
I I " I ~" I ..
I
, I
!.... __ .. mn---....J
r --, ' ... _ -,Jr;'--_.J
I I r ,
• P~ i • I I .. , :::::J-" p-
I ,." I • I :::t~t.. I ~
I n,' I I .. , 1l~ I
'-~, ... ..I i I
r;::;
L __ ~l1 ___ .J
~ -,
I -0-I
I • I ~§'" I • .. I '. I •
,:;J ~ I
n, I
, $ Ql'"h
, l __ ,So'n--_...1
,
~
.~(') I ---
~. "i r 1
:-> }:.t , ~ I p~ I
, I
, I I
~ ~ ~L 8
I ~~ I ..
-
L j
I
I !lQlr
fUJI'
i" . T :;-~§";-::-.:i--:,:::::::;~: ltt-- -~-"-->,,--~~:::',
~,_ --,c __ ~~ -_-.. ~,:, -, f58-TH-A 'IE-5HYAKIMA-AVE-N£)--
~ ___ ~ __ ~L_---------
... ~'it" ; . . ',,'-.
PNW HOLDINGS LLC SADDLE8ROOK
I ii' l~ ... """" -SJrt!1'fA.V
tJdr~ $I! 36TH ,r. $WE IllS mid ,58THAtlfhVE$I! lilll "£RCCR/SLAAfJ.IVA RENrOH. IVA
po6J5U-U4T
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
KCRTS Modeling
for
Saddlebrook
DRS Project No. 12040
City of Renton Project No. PRE12·050
Owner/Applicant
PNW Holdings LLC
9675 SE 36 th Street, Suite 105
Mercer Island, Washington 98040
P,ep8lOdby
D. R. STRONG Consulting Engineers, Inc.
10604 N.E. 38th Place, Suite 101
Kirkland WA 98033
(425) 827-3063
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
KCRTS MODELLING
Modeling input
Land·cover Entire
Site
Till forest (ac) 4.357
Till Grass (ac) 0.000
Till Pasture (ac) 0.000
Wetland (ac) 0.000
Impervious (ac) 0.000
Scale Factor: 1.00
Time Step: Hourly
Data Type: Reduced
Project location: Seatac
Total Area: 4.357
TDA Basin Basin
West Forested Bulldout
0.000 73.490 0.000
0.000 0.000 . 42.624
1.566 0.000 0.000
0.000 0.000 0.000
0.218 0.000 30.866
1.00 1.00 1.00
Hourly Hourly Hourly
Reduced Reduced Reduced
Seatac Seatac Seatac
1.784 73.490 73.490
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Modeling results
Entire Site
Flow Frequenoy Analysis
Time Series File:wholesitehistorio.tsf
Projeot Location:Sea-Tao
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak --Peaks
(CFS) (CFS)
0.275 2 2/09/01 18:00 0.352
0.075 7 1/06/02 3:00 0.275
0.204 4 2/28/03 3:00 0.211
0.007 8 3/24/04 20:00 0.204
0.121 6 1/05/05 8:00 0.178
0.211 3 1/18/06 21:00 0.121
0.178 5 11/24/06 4:00 0.075
0.352 1 1/09/08 9:00 0.007
Computed Peaks 0.326
TDA West
Flow Frequency Analysis
Xime Series File:tdaweatexisting.tsf
Projeot Loaation:Sea-Tao
Rank Return Prob
Period
1 100.00 0.990
2 25.00 0.960
3 10.00 0.900
4 5.00 0.800
5 3.00 0.667
6 2.00 0.500
7 1.30 0.231
8 1.10 0.091
50.00 0.980
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak --Peaks Rank Ret.urn Prob
(CFS) (CFS) Period
0.148 4 2/09/01 15:00 0.292 1 100.00 0.990
0.088 7· 1/05/02 16:00 0.158 2 25.00 0.960
0.158 2 2/27/03 7:00 0.150 3 10.00 0.900
0.061 8 8/26/04 2:00 0.148 4 5.00 0.800
0,090 6 1/05/05 8:00 0.142 5 3.00 0.667
0.150 3 1/18/06 16:00 0.090 6 2.00 0.500
0.142 5 11/24/06 3:00 0.088 7 1.30 0.231
0.292 1 1/09/08 6:00 0.061 8 1.10 0.091
Computed Peaks 0.248 50.00 0.980
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Basin Forested
F~o\'1 Frequency Analysis
Time Series File:basinforested.tsf
Project Location:Sea-Tao
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
4.63 2 2/09/01 18:00
1.26 7 1/06/02 3:00
3.43 4 2/28/03 3:00
0.122 8 3/24/04 20:00
2.04 6 1/05/05 8:00
3.56 3 1/18/06 21:00
3.00 5 11/24/06 4:00
5.93 1 1/09/08 9:00
Computed Peaks
Basin Buildout
Flow Frequenoy Analysis
Time Series File:basinbuildout.tsf
Projeot Looation:Sea-Tao
-----Flow Frequency Analysis-------
--Peaks Rank RetUrn Prob
(CFS) Period
5.93 1 100.00 0.990
4.63 2 25.00 0.960
3.56 3 10.00 0.900
3.43 4 5.00 0.800
3.00 5 3.00 0.667
2.04 6 2.00 0.500
1.26 7 . 1.30 0.231
0.122 8 1.10 0.091
5.50 50.00 0.980
---Annual Peak Flow Rates--------Fl.ow Frequency Ana1ysio-------
Fl.ow Rate Rank Time of Peak --Peaks Rank Return Prob
(CFS) (CFS) Period
11.30 5 2/09/01 2:00 23.59 1 100.00 0.990
6.54 7 1/05/02 16:00 13.74 2 25.00 0.960
13.74 2 2/27/03 7:00 12.33 3 10.00 0.900
6.49 6 8/26/04 2:00 11.90 4 5.00 0.800.
10.38 6 10/28/04 16:00 11.30 5 3.00 0.667
11.90 4 1/18/06 16:00 10.38 6 2.00 0.500
12.33 3 10/26/06 0:00 8.54 7 1.30 0.231
23.59 1 1/09/08 6:00 8.49 8 1.10 0.091
Computed Peaks 20.31 50.00 0.980
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PUBLIC WORKS DEPARTMENT
MEMORAND
DATE: August 16 , 2012
TO: Arneta Henninger, Plan Reviewer --------_. ------
-------~
FROM: Ron Straka, Surface Water Utility SlJ!)enlisclr,.~:n~~8-__ i .. _ .. _. __ ~_ .. _-.J
Hebe Bernardo, Surface Water Utility Engineer, x7264 STAFF CONTACT:
SUBJECT: Saddlebrool{ Plat Adjustment 2012-03
The City of Renton Surface Water Utility has completed review of the adjustment
request for the Saddlebrook Plat in accordance with City adopted 2009 King County
Surface Water Design Manual (KCSWDM) and City Amendments to the 2009 KCSWDM.
Our review of the Information leads us to understand that the applicant's engineering is .
requesting an adjustment from the 2009 King County Surface Water Design Manual to
core requirement #1 (section 1.2.1), Discharge at the Natural Location. Our review of
the Information provided by the applicant engineer on August 13, 2012, provides the
following findings:
1. The proposed project has not completed the process preliminary plat approval
or SEPA review.
2. The site Is located in two existing parcels (3664500260 and 3664500261) with a
total area of 4.36 acers. Parcels are situated atop a ridge and discharges
runoff into two subbasins. Tributary Drainage Area (TDA) West is
approximately 1.78 acres and discharges to 156th Avenue SE while TDA East is
comprised of the remaining 2.58 acres and discharges to 158th Avenue SE.
The discharge elevation of TOA West is approximately six feet lower than that of
TOA East. These two flowpaths converge at a point approximately 3,000 feet
downstream of TDA West and 4,900 feet downstream ofTDA East at the
corner of 156th Avenue SE and SE 144th Street (convergence point).
3. The proposal is to collect much of the runoff from the project site (4.36 acres)
and direct it to a single combined detention and water quality facility located in
the west portion of the site. The allowed release would then discharge through
an eXisting conveyance system into the right-of-way of 156th Avenue SE where it
continues to go south and converges with TDA East in SE 144th Street.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Jan lilian
Page 2 014
August 16, 2012
4. No downstream analysis has been completed and submitted to the City for
review. However, a preliminary field recognizance ofthe downstream drainage
system was completed by the applicant and applicant's engineer. Findings were
discussed In the adjustment letter. Preliminary analysis demonstrated that the
downstream pat h from TDA West is mostly comprised of a constructed
conveyance system from the site to the convergence point. This conveyance
system Is made up of grass and rock-lined ditches as well as culverts, pipes,
and catch basins.
5. King County drainage complaints In the area were reviewed and the basin
dra./nlng to the conveyance system was determined using King County
iMAP. This resource review revealed an overall basin size of approximately
73.5 acres and no relevant drainage complaints in the last 15 years
downstream ofthe Site.
6. To analyze the impact of the discharge rate, the King County Runoff Time
Series Software was used to examine the overall site in a forested condition,
TDA West's existing condition, and the 73.5 acre basin In a forested condition as
well as a fuli build-out condition (undetained, based on KCSWDM Table
3.2.2.0 for 4.0 DU/GA, 42% impervious). TDA West (in its existing condition)
generates approximately 0.29 cfs of runoff for the 100-year return interval.
The total site, when analyzed for the forested condition, will generate
approximately 0.35 cfs of runoff for the 100-year return Interval. The existing
conveyance system downstream of the proposed plat would receive a net
increase in runoff of 0.06 cfs, which is less than 0.1 cfs. The total drainage
basin currently generates 5.93 cfs and 23.59 cfs, for forested and build-out
conditions assuming no flow control, respectively.
Based on these understandings, findings, and per section 1.2.1 of the 2009 Surface
Water Design Manual as amended by the City, the adjustment to allow the diversion of
runoff to a single combined stormwater flow control and water quality treatment facility
draining to SE 156th Avenue is approved with the following conditions:
1. A level one downstream analysis In accordance with section 1.2.1 of the 2009
KCSWDM as amended by the City shall be submitted to the City for review.
Based on this analysis, the City may require the completion of a downstream
analysis and/or improvements to the downstream system.
H:\File Sy.\swP -Surface Water Projects\SWp·27 • Surface Water Projects (CIP)\27·3129 Renton Stormwater
Manual\ADJUSTMENTS\2012\2012·35addlebrook.doc\HBah
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Jan Jlllan
Page 3 of 4
August 16, 2012
2. The proposed combined detention and water quality treatment facility to be
constructed on the northwest corner of the site shall be designed as a level 3
flow control for the entire site in using the two basins as the existing (forested)
site conditions. The stormwater facility shall be designed in accordance with
section 1.2.3 of the 2009 KCSWDM.
3. Surface water discharge from the west basin is required to follow its existing
drainage course.
4. Water quality treatment in accordance with section 1.2,8 of the 2009 KCSWDM
shall be provided for all targeted surfaces prior to discharging from the site. The
water quality facility shall be sized based on the entire proposed subdivision
draining to the facility including any required frontage improvements.
5. The release rate from the detention facility will be based on all of the tributary
area being directed to the facility.
6. The volume of the stormwater detention facility shall be based on all flows
directed to the facility at full development under current zoning. The detention
volume shall be sized using level 3 Flood Problem Flow Control Standards in the
2009 KCSWDM, The pre-developed condition runoff rates for the sizing of the
facility shall be based on the entire site using forested as pre-developed site
conditions. The TIR shall include all required documentation detailed In chapter
2 of the 2009 KCSWDM for the sizing of the facility.
7. Additional storm drainage requirements identified by the City of Renton as part
of the SEPA review process or preliminary plat approval may apply to this
project. please note that the approval of this adjustment does not relieve the
applicant from other conditions that may be stipulated in future city, state, or
federal permits/reqLlirements.
Notes to applicant:
1. All lots within the Saddlebrook Plat are required to provide now control BMPs in
accordance with figure C.1.3.A of the 2009 KCSWDM. Flow control BMP credits
in accordance with section 1.2.3 of the 2005 KCSWDM may be used to reduce
the size of the required flow control facility. The feasibility to implement full
dispersion BMPs and full Infiltration BMPs shall be verified first. If
implementation of full dispersion BMPs and full Infiltration BMPS are not
feasible alternatives, then any of the BMPs listed in figure C.1.3.A shall be
provided. The selected flow control BMP to be implemented on each lot shall be
shown on the construction plans. Drainage calculations for the sizing of the
proposed BMPs to be constructed on each lot shall be Included in the TIR.
H:\File Sys\SWP -Surface Water ProJects\SWP-27 -Surface Water ProJects (CIP)\27-3129 Renton Stormwater
Manual\AOJUSTMENTS\2012\2012-3 Saddlebrook.doc\HBah
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Jan lilian
Page 4 014
August 16, 2012
Construction of the proposed flow control BMPs may be differed for
construction on the lot at time of building permit.
If you have any questions about this adjustment, please contact Hebe Bernardo or me.
Attachments
cc: Lys Hornsby, P.E., Utility Systems Director
Kayren Kittrick, Development Engineering Supervisor
Vanessa Dolbee. Planner
File
H:\File Sys\SWP -Surface Water Projects\SWP·27 -Surface Water Projects (CIP)\27-3129 Renton Stormwater
Manual\ADJUSTMENTS\2012\2012·3 Saddlebrook.doc\HBah
Form No. 14
Subdivision Guarantee
Issued by
Guarantee No,: 4209-1942808
City of Renton
Planning Division
SEP - 4 2011
First American Title Insurance Company
818 Stewart Sf, Ste 800, Seattle, WA 98101
Title Officer: Lavonne Bowman
Phone: (206)728-0400
FAX:
A"rst American ntle
Form No. 14 Guarantee No.: 4209-1942808
Page No.: 1 Subdivision Guarantee (4~10~75)
First AmericaJlJJ.
First American Tille Insurance COmpany
818 Stewart St, Ste 800
Seattle, WA 98101
Phn -(206)728-0400 (800)826-7718
Fax ~
LaVonne Bowman
(206) 336-0728
lavbowman@firstam.com
Peter Child
(206) 336-0726
pchild@firstam.com
King County Title Team Two
818 Stewart St, Ste. 800, Seattle, WA 98101
Fax No. (866) 561-3729
Kelly Cornwall
(206) 336-0725
kcomwall@firstam.com
Curtis Goodman
(206) 615-3069
cgoodman@firstam.com
Kathy Turner
(206) 336-0724
kturner@firstam.com
PLEASE SEND AJ-L RECORDING PAC~G.ES TO 81~. STEW~.!{T ST, STE. 800, SEATTLE, WA
~8101.
LIABILITY
FEE
$
$
SUBDIVISION GUARANTEE
1,000.00 ORDER NO.:
350.00 TAX $ 33.25 YOUR REF.:
First American Title Insurance Company
a Corporation, herein called the Company
4209-1942808
Subject to the Liability Exclusions and Limitations set forth below and in Schedule A.
GUARANTEES
PNW Holdings LLC
herein called the Assured, against loss not exceeding the liability amount stated above which the Assured
shall sustain by reason of any incorrectness in the assurances set forth in Schedule A.
LIABILITY EXCLUSIONS AND LIMITATIONS
1. No guarantee is given nor liability assumed with respect to the validity, legal effect or priority of
any matter shown therein.
2. The Company's liability hereunder shall be limited to the amount of actual loss sustained by the
Assured because of reliance upon the assurance herein set forth, but in no event shall the
Company's liability exceed the liability amount set forth above.
3. This Guarantee is restricted to the use of the Assured for the purpose of providing title evidence
as may be required when subdividing land pursuant to the provisions of Chapter 58.17, R.C.W.,
and the local regulations and ordinances adopted pursuant to said statute. It is not to be used
as a basis for closing any transaction affecting title to said property.
A'rst American Title
Form No. 14
Subdivision Guarantee (4~ 1() 75)
Dated: August 07,2012 at 7:30 A.M.
First American Title
Guarantee No.: 4209-1942808
Page No.: 2
Form No. 14
Subdivision Guarantee (4-10-75)
SCHEDULE A
The assurances referred to on the face page are:
A. Title is vested in:
MICHAEL J. PERRY, AS HIS SOLE AND SEPARATE PROPERTY
Guarantee No.: 4209-1942808
Page No.: 3
B. That according to the Company's title plant records relative to the following described real
property (including those records maintained and indexed by name), there are no other
documents affecting title to said real property or any porition thereof, other than those shown
below under Record Matters.
The following matters are excluded from the coverage of this Guarantee:
1. Unpatented Mining Claims, reservations or exceptions in patents or in acts authorizing the
issuance thereof.
2. Water rights, claims or title to water.
3. Tax Deeds to the State of Washington.
4. Documents pertaining to mineral estates.
DESCRIPTION:
LOTS 1 AND 2, KING COUNTY SHORT PLAT NO. 976093, RECORDED UNDER RECORDING NO.
7612010798, IN KING COUNTY, WASHINGTON.
APN: 366450-0261-04 and 366450-0260-05
First American Title
Form No. 14
Subdivision Guarantee (4-10-75)
RECORD MATTERS:
Guarantee No.: 4209-1942808
Page No.: 4
1. General Taxes for the year 2012. The first half becomes delinquent after April 30th. The second
half becomes delinquent after October 31st.
Tax Account No.: 366450-0261-04
1st Half
Amount Billed: $ 736.04
Amount Paid: $ 736.04
Amount Due: $ 0.00
Assessed Land Value: $ 102,000.00
Assessed Improvement Value: $ 7,000.00
2nd Half
Amount Billed: $ 736.03
Amount Paid: $ 0.00
Amount Due: $ 736.03
Assessed Land Value: $ 102,000.00
Assessed Improvement Value: $ 7,000.00
Affects: Lot 1
2. General Taxes for the year 2012. The first half becomes delinquent after April 30th. The second
half becomes delinquent after October 31st.
Tax Account No.: 366450-0260-05
1st Half
Amount Billed: $ 2,351.99
Amount Paid: $ 2,351.99
Amount Due: $ 0.00
Assessed Land Value: $ 284,000.00
Assessed Improvement Value: $ 68,000.00
2nd Half
Amount Billed: $ 2,351.98
Amount Paid: $ 0.00
Amount Due: $ 2,351.98
Assessed Land Value: $ 284,000.00
Assessed Improvement Value: $ 68,000.00
Affects: Lot 2
3. Deed of Trust and the terms and conditions thereof.
Grantor/Trustor:
Grantee/Beneficiary:
Trustee:
Amount:
Recorded:
Recording Information:
Michael J. Perry, an unmarried man, as his separate estate
Equity Network LLC, A Washington Limited Liability Company
Ticor Title Company
$237,807.72
September 23, 2008
20080923000291
First American T7t1e
Form No. 14
Subdivision Guarantee (4-10-75)
Guarantee No.: 4209-1942808
Page No.: 5
According to the public records, the beneficial interest under the deed of trust was assigned to
Equity Trust Company Custodian FBO Kenneth E. Mills IRA No, 41888, as to an undivided Forty
Five percent (45%) interest, Equity Trust Company Custodian FBO Jerry Evans IRA No. 58162, as
to an undivided Eighteen percent (18%) interest, Terrance B. Evans, a married man as his
separate estate, as to an undivided Fifteen percent (15%) interest and Kenneth E. Mills and
Jessatha M. Mills, husband and wife, as to an undivided Four percent (4%) interest; and Equity
Trust Company Custodian FBO Jerry Evans Roth IRA No. 90574, as to an undivided Eighteen
percent (18%) by assignment recorded September 30, 2008 and October 31,2011 as
20080930000439 and 20111031000972 of Official Records.
A document recorded August 04, 2011 as 20110804001209 of Official Records provides that
Robert N. Faber was substituted as trustee under the deed of trust.
4. Judgment.
In Favor of:
Against:
Amount:
Dated:
Filed:
Judgment No. (if applicable) :
Case/Cause No.:
State of Washington
Michael J C Perry
$1,700.00, together with interest, costs and attorneys' fees, if
any
February 01, 2010
February 01, 2010
10-9-03388-8
08-1-02922-7
Attorney for Judgment Creditor: King County, Prosecuting Atty
5. Lien for Utility Service in favor of City of Renton
Against: Lucille Perry
Amount: $498.20
Recorded: April 23, 2012
Recording Information: 20120423000670
Affects: Lot 1
6. Lien for Utility Service in favor of City of Renton
Against: Lucille Perry
Amount: $498.20
Recorded:
Recording Information:
Affects:
April 23, 2012
20120423000671
Lot 2
7. Deed of Trust and the terms and conditions thereof.
Grantor/Trustor: Michael J. Perry, an unmarried man
Grantee/BenefiCiary: PNW Holdings, LLC, a Washington limited liability company
Trustee: First American Title Insurance Company, a Corporation
Amount: $250,000.00
Recorded: August 10, 2012
Recording Information: 20120810001229
First Amedcan Title
Form No. 14
Subdivision Guarantee (4-10-75)
Guarantee No.: 4209-1942808
Page No.: 6
8. Any and all offers of dedication, conditions, restrictions, easements, fence line/boundary
discrepancies, notes and/or provisions shown or disclosed by Short Plat No. 976093 recorded
under recording number 7612010798.
9. Conditions, notes, easements, provisions and/or encroachments contained or delineated on the
face of the Survey recorded under Recording No. 8102099006.
10. Conditions, notes, easements, provisions and/or encroachments contained or delineated on the
face of the Survey recorded under Recording No. 9712159015.
INFORMATIONAL NOTES
A. Any sketch attached hereto is done so as a courtesy only and is not part of any title commitment
or policy. It is furnished solely for the purpose of assisting in locating the premises and First
American expressly disclaims any liability which may result from reliance made upon it.
First American Tltle
Form No. 14
Subdivision Guarantee (4-10-75)
Guarantee No.: 4209-1942808
Page No.: 7
SCHEDULE OF EXCLUSIONS FROM COVERAGE OF THIS GUARANTEE
1. Except to the extent that specific assurance are provided In this Guarantee, the Company assumes no liability for loss or damage by reason of the foliowlng:
(a) Defects, liens, encumbrances, adverse cialms or other matters against the title, whether or not shown by the public records.
(b) (1) Taxes or assessments of any taxing authority that levies taxes or assessments on real property; or, (2) Proceedings by a public agency which may result in taxes
or assessments, or notices of such proceedings, whether or not the matters excluded under (1) or (2) are shown by the records of the taxing authority or by the public
records.
(c) (1) Unpatented mining claims; (2) reservations or exceptions In patents or In Acts authorizing the Issuance thereof; (3) water rights, cialms or title to water, whether
or not the matters excluded under (1), (2) or (3) are shown by the public records.
2. Notwithstanding any specific assurances which are provided in this Guarantee, the Company assumes no liability for loss or damage by reason of the following:
(a) Defects, liens, encumbrances, adverse cialms or other matters affecting the title to any property beyond the lines of the land expressly described In this Guarantee, or
title to streets, roads, avenues, lanes, ways or waterways to which such land abuts, or the right to maintain therein vaults, tunnels, ramps, or any structure or Improvements;
or any rights or easements therein, unless such property, rights or easements are expressly and specifically set forth In said description.
(b) Defects, liens, encumbrances, adverse claims or other matters, whether or not shown by the public records; (1) which are created, suffered, assumed or agreed to by
one or more of the Assureds; (2) which result In no loss to the Assured; or (3) which do not result In the Invalidity or potential invalidity of any judicial or non~judiclal
proceeding which Is wlth!n the scope and purpose of the assurances provided.
(c) The Identity of any party shown or referred to In this Guarantee.
(d) The validity, legal effect or priority of any matter shown or referred to In this Guarantee.
GUARANTEE CONDITIONS AND STIPULATIONS
1. Definition of Terms.
The following terms when used In the Guarantee mean:
(a) the "Assured": the party or parties named as the Assured In this Guarantee, or
on a supplemental writing executed by the Company.
(b) "land": the land described or referred to In this Guarantee, and Improvements
affixed thereto which by law constitute real property. The term "land" does not
include any property beyond the lines of the area described or referred to In this
Guarantee, nor any right, title, Interest, estate or easement In abutting streets, roads,
avenues, alleys, lanes, ways or waterways.
(c) "mortgage": mortgage, deed of trust, trust deed, or other security Instrument.
(d) "public records" : records established under state statutes at Date of
Guarantee for the purpose of imparting constructive notice of matters relating to real
property to purchasers for value and without knowledge.
(e) "date": the effective date.
2. Notice of Claim to be Given by Assured Claimant.
An Assured shall notify the Company promptly In writing In case knowledge shall
come to an Assured hereunder of any claim of title or interest which is adverse to the
title to the estate or Interest, as stated herein, and which might cause loss or damage
for which the Company may be liable by virtue of this Guarantee. If prompt notice
shall not be given to the Company, then all liabllity of the Company shall terminate
with regard to the matter or matters for which prompt notice is required; provided,
however, that failure to notify the Company shall In no case prejudice the rights of
any Assured under this Guarantee unless the Company shall be prejudiced by the
failure and then only to the extent of the prejudice.
3. No Duty to Defend or Prosecute.
The Company shall have no duty to defend or prosecute any action or proceeding to
which the Assured is a party, notwithstanding the nature of any allegation In such
action or proceeding.
4. Company's Option to Defend or Prosecute Actions; Duty of Assured.
Claimant to Cooperate.
Even though the Company has no duty to defend or prosecute as set forth In
Paragraph 3 above:
(a) The Company shall have the right, at Its sole option and cost, to Institute and
prosecute any action or proceeding, Interpose a defense, as limited In (b), or to do
any other act whIch in Its opInion may be necessary or desirable to establish the title
to the estate or Interest as stated hereIn, or to establish the lien rights of the
Assured, or to prevent or reduce loss or damage to the Assured. The Company may
take any appropriate action under the terms of this Guarantee, whether or not It shall
be liable hereunder, and shall not thereby concede liability or waive any provision of
this Guarantee. If the Company shall exercise Its rights under this paragraph, It shall
do so diligently.
(b) If the Company elects to exercise Its options as stated in Paragraph 4{a) the
Company shall have the right to select counsel of Its choIce (subject to the right of
such Assured to object for reasonable cause) to represent the Assured and shall not
be liable for and will not pay the fees of any other counsel, nor will the Company pay
any fees, costs or expenses Incurred by an Assured in the defense of those causes of
act/on which allege matters not covered by this Guarantee.
(c) Whenever the Company shall have brought an action or Interposed a defense
as permitted by the provisions of this Guarantee, the Company may pursue any
litigation to final determination by a court of competent jurisdiction and expressly
reserves the right, In Its sole discretion, to appeal from an adverse judgment or order.
(d) In all cases where this Guarantee permits the Company to prosecute or
provide for the defense of any action or proceeding, an Assured shall secure to the
Company the right to so prosecute or provide for the defense of any action or
proceeding, and all appeals therein, and permit the Company to use, at tts option, the
name of such Assured for this purpose. Whenever requested by the Company, an
Assured, at the Company's expense, shall gIve the Company all reasonable aid In any
action or proceeding, securing eVidence, obtaining witnesses, proseaJtlng or
defending the action or lawful act whIch In the opInion of the Company may be
necessary or desirable to establish the title to the estate or Interest as stated herein,
or to establish the lien rights of the Assured. If the Company Is prejudiced by the
failure of the Assured to furnish the required cooperation, the Company's obligations
to the Assured under the Guarantee shan terminate.
S. Proof of Loss or Damage.
In addition to and after the notices required under Section 2 of these Conditions and
Stipulations have been provided to the Company, a proof of loss or damage signed
and sworn to by the Assured shall be furnished to the Company within ninety (90)
days after the Assured shall ascertain the facts gIving rise to the loss or damage. The
proof of loss or damage shall describe the matters covered by this Guarantee which
constitute the basis of loss or damage and shall state, to the extent poSSible, the
basis of calculating the amount of the loss or damage. If the Company Is prejudiced
by the failure of the Assured to provide the required proof of loss or damage, the
Company's obligation to such Assured under the Guarantee shall terminate. In
addition, the Assured may reasonably be requIred to submit to examination under
oath by any authorized representative of the Company and shall produce for
examination, Inspection and copying, at such reasonable times and places as may be
deSignated by any authorized representative of the Company, all records, books,
ledgers, checks, correspondence and memoranda, whether bearing a date before or
after Date of Guarantee, which reasonably pertaIn to the loss or damage. Further, If
requested by any authorized representative of the Company, the Assured shall grant
Its permiSSion, In writing, for any authorized representative of the Company to
examIne, Inspect and copy all records, books, ledgers, checks, correspondence and
memoranda In the custody or control of a third party, which reasonably pertain to the
loss or Damage. All information deSignated as confidential by the Assured provided
to the Company, pursuant to this Section shall not be disclosed to others unless, In
the reasonable judgment of the Company, It Is necessary in the adminlstratfon of the
claim. Failure of the Assured to submit for examination under oath, produce other
reasonably requested Information or grant permission to secure reasonably necessary
Information from third parties as required In the above paragraph, unless prohibited
by law or governmental regulation, shall terminate any liability of the Company under
this Guarantee to the Assured for that claim.
Form No. 1282 (Rev. 12/15/95)
First American Title
Form No. 14
Subdivision Guarantee (4-10-75)
6. Options to Payor Otherwise Settle Claims: Termination of Liability.
In case of a claim under this Guarantee, the Company shall have the following
additional options:
(a) To Payor Tender Payment of the Amount of Liability or to Purchase the
Indebtedness.
The Company shall have the option to payor settle or compromise for or In the name
of the Assured any claim which could result in loss to the Assured within the coverage
of this Guarantee, or to pay the full amount of this Guarantee or, If this Guarantee Is
Issued for the benefit of a holder of a mortgage or a lienholder, the Company shall
have the option to purchase the Indebtedness secured by said mortgage or said lien
for the amount owing thereon, together with any costs, reasonable attomeys' fees and
expenses Incurred by the Assured claimant which were authorized by the Company up
to the time of purchase.
Such purchase, payment or tender of payment of the full amount of the Guarantee
shall terminate all liability of the Company hereunder. In the event after notice of
claim has been given to the Company by the Assured the Company offers to purchase
said Indebtedness, the owner of such Indebtedness shall transfer and assign said
indebtedness, together with any collateral security, to the Company upon payment of
the purchase price.
Upon the exercise by the Company of the option provided for In paragraph (a) the
Company's obllgation to the Assured under thIs Guarantee for the claimed loss or
damage, other than to make the payment required In that paragraph, shall terminate,
Including any obligation to continue the defense or prosecution of any litIgation for
which the Company has exercised Its options under Paragraph 4, and the Guarantee
shall be surrendered to the Company for cancellatiOn.
(b) To Payor Otherwise Settle With Parties Other Than the Assured or With the
Assured Claimant.
To payor otherwise settle with other parties for or in the name of an Assured claimant
any claim Assured against under this Guarantee, together with any costs, attomeys'
fees and expenses Incurred by the Assured claimant whIch were authorized by the
Company up to the time of payment and which the Company Is obligated to pay.
Upon the exercise by the Company of the option provided for In Paragraph (b) the
Company's obligation to the Assured under this Guarantee for the claimed loss or
damage, other than to make the payment required In that paragraph, shall terminate,
Including any obligation to continue the defense or prosecution of any litigation for
which the Company has exercised Its options under Paragraph 4.
7. Determination and Extent of Liability.
This Guarantee Is a contract of IndemnIty agaInst actual monetary loss or damage
sustained or Incurred by the Assured claimant who has suffered loss or damage by
reason of reliance upon the assurances set forth In this Guarantee and only to the
extent herein described, and subject to the Exclusions From Coverage of This
Guarantee.
The Uablllty of the Company under this Guarantee to the Assured shall not exceed the
least of:
(a) the amount of liability stated In this Guarantee;
(b) the amount of the unpaid principal Indebtedness secured by the mortgage of an
Assured mortgagee, as limited or provided under Section 6 of these ConditIons and
Stipulations or as reduced under Section 9 of these Conditions and StIpulations, at the
time the loss or damage Assured against by this Guarantee occurs, together with
Interest thereon; or
(c) the difference between the value of the estate or Interest covered hereby as
stated hereIn and the value of the estate or Interest subject to any defect, lien or
encumbrance Assured against by this Guarantee.
8. limitation of Liability.
(a) If the Company establishes the title, or removes the alleged defect, lien or
encumbrance, or cures any other matter Assured against by this Guarantee In a
reasonably diligent manner by any method, Including litigatIon and the completIon of
any appeals therefrom, It shall have fully performed Its obligations with respect to that
matter and shall not be liable for any loss or damage caused thereby.
(b) In the event of any litigation by the Company or with the Company's consent,
the Company shall have no lIabll1ty for loss or damage until there has been a final
determInation by a court of competent jurisdiction, and disposition of all appeals
therefrom, adverse to the title, as stated herein.
Guarantee No.: 4209-1942808
Page No.: 8
(c) The Company shall not be JJable for loss or damage to any Assured for liability
voluntarily assumed by the Assured In settling any claim or suit without the
prior written consent of the Company.
9. Reduction of Liability or Termination of liability.
All payments under this Guarantee, except payments made for costs, attorneys' fees
and expenses pursuant to Paragraph 4 shalf reduce the amount of liability pro tanto.
10. Payment of Loss.
(a) No payment shaIJ be made without producing this Guarantee for endorsement
of the payment unless the Guarantee has been lost or destroyed, In which case proof
of loss or destructIon shall be furnIshed to the satisfaction of the Company.
(b) When liability and the extent of loss or damage has been definitely fixed in
accordance with these Conditions and StipulatIons, the loss or damage shall be
payable withIn thirty (30) days thereafter.
11. Subrogation Upon Payment or Settlement.
Whenever the Company shall have settled and paid a claim under this Guarantee, all
right of subrogation shall vest In the Company unaffected by any act of the Assured
claimant.
The Company shall be subrogated to and be entitled to all rights and remedies which
the Assured would have had against any person or property in respect to the claim had
this Guarantee not been Issued. If requested by the Company, the Assured shall
transfer to the Company all rights and remedies against any person or property
necessary In order to perfect this rJght of subrogation. The Assured shall permit the
Company to sue, compromise or settle In the name of the Assured and to use the
name of the Assured in any transaction or litigation Involving these rights or remedies.
If a payment on account of a claim does not fully cover the loss of the Assured the
Company shall be subrogated to all rights and remedies of the Assured after the
Assured shall have recovered Its principal, Interest, and costs of collection.
12. Arbitration.
Unless prohibited by applicable law, either the Company or the Assured may demand
arbitration pursuant to the Title Insurance Arbitration Rules of the American Arbitration
AssocIation. Arbitrable matters may Include, but are not Ilmlted to, any controversy or
claim between the Company and the Assured ariSIng out of or relating to this
Guarantee, any service of the Company In connection with its Issuance or the breach
of a Guarantee provision or other obligation. All arbitrable matters when the Amount
of UabJilty Is $1,000,000 or less shall be arbitrated at the option of either the Company
or the Assured. All arbitrable matters when the amount of liability is In excess of
$1,000,000 shall be arbitrated only when agreed to by both the Company and the
Assured. The Rules In effect at Date of Guarantee shall be binding upon the parties.
The award may Include attorneys' fees only if the laws of the state In whIch the land Is
located permits a court to award attorneys' fees to a prevailing party. Judgment upon
the award rendered by the Arbltrator(s) may be entered in any court having
jurisdiction thereof.
The law of the situs of the land shall apply to an arbitration under the l1tle Insurance
Arbitration Rules.
A copy of the Rules may be obtained from the Company upon request.
13. Liability Limited to This Guaranteej Guarantee Entire Contract.
(a) This Guarantee together with all endorsements, If any, attached hereto by the
Company Is the entire Guarantee and contract between the Assured and the
Company. In Interpreting any provision of this Guarantee, this Guarantee shall be
construed as a whole.
(b) Any claim of loss or damage, whether or not based on negligence, or any action
asserting such claim, shall be restricted to this Guarantee.
(c) No amendment of or endorsement to this Guarantee can be made except by a
wrIting endorsed hereon or attached hereto signed by either the PreSident, a Vice
PreSident, the Secretary, an AssIstant Secretary, or validating officer or authorized
Signatory of the Company.
14. Notices, Where Sent.
All notices required to be given the Company and any statement In writing required to
be furnished the Company shall include the number of this Guarantee and shall be
addressed to the Company at 2 First AmerIcan Way. Bldg. 2, Santa Ana, CA. 92707.
Form No. 1282 (Rev. 12/15/95)
A'rst American Title
First American Title
113.82
;J:,2
15076'
0020
'" 29 • LOT 2
0.44 AC
9035
First American Title
"' .. " ."
PAR, 1
o.
0
00
-0
JANETT'S RENTON
BOULEVARD TRACTS
VOL 17-60
0.26"
0251
~l"
0285
390001
0250
(SP)
PAR. 2
366450
KC 7612010798
366450
KCSP577011
(5. P. )
7711160735 .,.
om
LOT 1
LOT 3
1098915 SE' 5
2.52 N:;
0240
31700.
0245
6
4.1 AC
0260
1. 36 AC
0278
7
": ~,
• ~i
~ ,
" :",i
SltNSITlVE
ARijA
12
13
14
First American Title
After Recording Mail To:
MOGREN, GLESSNER & ROT! P.S.
Attorneys at Law
P.O. Box 90
E2360il28
08/21/2008 18:0' KING COUNTY, lolA
20080821001273.001
Renton, WA 98057-0090 TAX $10.00
SALE $0.00 PAGE-001 OF 001
QUIT CLAIM DEED
THE GRANTOR, JEFF GAIDJIERGIS, Executor of the Estate of LUCILLE M.
PERRY, Deceased, King County Probate No. 07-4-02105-9 KNT, for and in
consideration of his distributive share, conveys and quit claims the following described
real property situated in King County, Washington, to MICHAEL J. PERRY, as his
separate estate, including any interest therein which Grantor may hereafter acquire:
Lots I and 2, King County Short Plat No. 976093, recorded under
Recording No. 7612010798, in King County, Washington.
Tax Account Nos. 366450-0261-04 and 366450-0260-05.
DATED this JL day of August, 2008.
Estate of LUCILLE M. PERRY
STATE OF WASHINGTON )
) ss
COUNTY OF KING )
. ON THIS DAY personally appeared before me JEFF GAIDJIERGIS to me
known to be the individual described in and who executed the within and foregoing
instrument, and acknowledged to me that he signed the same as his free and voluntary act
and deed, for the uses and Pllrposes therein mentioned.
First American Title
First American Title
20080821001273.002
GIVEN und~fJlll&-b.l!nd and official .seal this If> day of August, 2008. eef~: tINE ~'-... . .
First American Title
eee "'v.;; ....... ~ A:=" ~I ~ •• ;.;.~SIO,;~~(O "-\"A . C 'A _ ~ ::tl8 NOT'~ :<0\0' -;-~IV(aL4!=~.~Q~''''.,,;..e''''''_.';-c...'':--'-'; T lU-C"-"--c:=o.:::::::..-__ ~: 'VIr 't. \-13 ~ :;. ~ i -.... !:l:rn ~ Notary Public in and for the State "t '!? '" "'lIeLlC j I of Washington, residing at Renton. ",~",~·.0~1-\'l. .{~l My Conun. expires: /-;:"1 -\ 'Z..
QP"·'.u ..... ~~~ ." .
IV A""'~ /111 'i#'''''''''~111I11
First American Title
. ,
AFTER RECORDING RETIJRN TO:
Name:
Address:
City/State/Zip:
Trust Accounting Center
P. O. Box 730
Amicortes WA 98221
DEED OF TRUST
(for lISe in the State of Washington only) TICOR TITLE
File No.: ~731 / /'I{-< (;
Title Order No.: Ticor Title #6416759,1 {p-flv Y:>@I;"''-
Reference Numbers· of Related Documents: . .i.
Abbreviated Legal Desc:Lots I and 2, KCSPNo. 976093, Rec. no. 7612010798 . '1
THIS DEED OF TRUST, mede this 12th day of September
Michael J. Perry, an unmarried man. as his separate estate
who •• address is 13426 156thAvenue SE,Renton WA 98059
Ticor Title Company .
who.e address i. 600 SW 39th Street, Ste 100, Renton Wa 98057
Equity Network LLC, A Washington Limited Liability Company
whose address is PO Box 67; Snohomi.h WA 98291
,2008 between
,GRANTOR,
,and
, TRUSTEE,
,and
BENEFICIARY
WITNESSETH: Grantor hereby bargains, sells, and conveys to Trustee in trust, with power of sale, the
following described real property in King County, Washington:
Lots 1 and 2, King County Short Plat Number 976093, recorded under recording Number 7612010798, In
King County, Washington.
Assessor'. Property Tax PareeVAccount Number(.): 366450·0261-04 and 366450·0260·05
ADDITIONAL TERMS AND CONDITIONS ATTACHED AS EXHIBIT 'A' AND BY TIllS MENTION BECOME A
PART HEREOF.
20080923000291.001
which real property is not used principally for agricultural or fanning purposes, together with all the
tenements, hereditaments, md appurtenances now or hereafter thereUIito belonging or in any wise
appertaining. and the rents. issues and profits thereof.
This deed is for the purpose of securing perfonnance of each agreement of Grantor herein contained, and
payment of the sum of Two Hundred Thirty Seven Thousand Eight Hundred Seven ·and 721100
. Dollars ($ 237,807.72 ) .
with into.rest. in accordanCe with the terms of a·promiss~ry note of even date herewith,payable t.o Beneficiary.
or order, and made by Grantor, and all renewals, mQdification,s, and extensions thereof, and also such further
sums as may be edvm>ced or loaned by Beneficiary to Grantor, or any of their SUccessors or assigns, together
with interest thereon at such rate as shall be agreed upon.
Pa~e 10f3
First American Title
First American Title
20080923000291.002
To protect the security of this Deed of Trust, Grantor covenants anQ. agrees:
). To keep the prope~ in good ,condition and repair; to pennit no waste thereof; tQ com'p1ete an building,
structure, or improvement being built·or about to be built thereon; to restore promptly any building, structure,
or improvement thereon which may be damaged or destroyed; and to comply with all laws, ordinances,
regulations, covenants, conditions and restrictions affecting the property.
2. To pay before delinquent aU lawful taxes and assessments upon the property; to keep the property free and
clear of all other charges,liens, or encumbrances impairing the security of this Deed of Trust.
3. To keep all bUildings now or hereafter erected on the property descnbed herein continuously insured
against loss by fire or other hazards In an amount not less than the total debt secured by this Deed of Trust.
All policies shall be held by the BenefiCiary, and be in such companies as the Beneficiary may approve and
have loss payable first to the Beneficiary, as its interest may appear, and then to the Grantor. The amount
collected \Ulder any insurance policy may be 8{>plied upon any indebtedness hereby secured in such order as
fhe Beneficiary shall detennine. Such ~pplication by the Beneficiary shall not cause discontinuance of any
proceedings to foreclose this Deed of Trust. In the event offoreclosure, all rights of the Grantor in insurance
policies then in force sIt.all pass to the purchaser at the foreclosure sale. '
4. To defend any action or proceeding purporting to affect the security hereof or the rights or powers of
Beneficiary or Trustee, and to pay all costs and expenses, including cost oftitle search and attorney's fees in a
reasonable amount, in any such action or proceeding, and in any suit brQught by Be~eficfary to foreclose this
Deed of Trust.
5. To pay all costs, fees and expenses in connection with this Deed of Trust, including the expenses of the
Trustee incurred in enforcing the obligation secured hereby and Trustee's and attorney's tees actually
incurred. as provided by statute.
6. Should Grantor fail ,to pay when due any taxes. assessments. insurance' premiums, iiens, encumbrances or
other charges against the property hereinabove described, Beneficiary may pay the same, and the amount so
paid, with interest !II the rate set forth in the note secured hereby, shall be added to and become a part of the
debt secured in this Deed ofTrnst. .'
IT IS MUTUALLY AGREED 1HA T:
I. In the event any portion of the property is taken or damaged in an emmen! domain proceeding, the entire
amount of the award or such portion as may be necessary to fully satistY the obligation secured hereby, shall
be paid to Beneficiary to be applied to said obligation.
2. By acceptitig payment of any sum secured hereby after its due date, BenefiCiary does not waive its right to
require prompt payment when due ofan other sums so secured or to de<>lare default for faUure to .so pay.
3. The Trustee sbaU reconvey all or any· part of the property covered the this Deed of Trust to the person
entitled thereto, on written request of the Grantor and the Beneficim:y. or upon satisfaction of1he obligation
secured and written request fon:econveyance made by the Beneficiary -or the person en~tled thereto.
4. Upon default by GIantor in the payment of any indebtedness secnred hereby or in the performance of any
agreement contained herein, all sums ,secured hereby shall immediately becottre due and payable at the option
of the Beneficiary. In such event and upon written request of Beneficiary. Trustee shaH sell the trust property.
in accordance with the Deed ofTrus! Act of the State of Washington, at public auction to the highest bIdder.
Any pelson except Trustee may bid at Trustee's sale. Trustee sban apply the proceeds of the sale as follows:
(1) to 'the expense of the sale, including a reasonable Trustee's fee and attorney's fee; (2) in the obligation
secured by this Deed ofTrust; end (3) the sUIplu., if any, shall be distributed to the persons entitled thereto.
5. Trustee shall deliver to the purchaser at the sale its deed, without warranty, which shall convey to the
purchaser the interest in the property which Grantor had or had the power to convey at the time of his
execution of this Deed of Trust, and such as he may have acquired thereafter. Trustee's deed shall recite the
facts showing that the sa1e was conducted in compliance with all the requirements of law and of this Deed of
Trust. which recital shan be _prima facie evidence of such compliance and conclusive evidence thereof in
favor of bona fide purchaser and encumbrancers for value.
File #2731 Page 2 of3
First American Title
First American Title
6. The power of sale confenod by this Deed ofTrust and by the Deed of Trust Act of the Slate of Washington
is not.an exclusive remedr; Beneficiary may cause this Deed of Trust to be foreclosed as a mortgage.
7. In the event of the death. incapacity, disability or resignation of Trustee, Beneficiary may appoint in
writing a successor trustee, and upon the recording of such I;lppointment in the mortgage records of the county
in which this Deed of Trust is recorded, the successor trustee shall be vested with all powers of the original
trustee. The trustee is not obligated to notify any party hereto of pending sale under any other Deed of Trust
or of any action or proceeding in which Grantor, Trustee or Beneficiary shaIt be a party unless such action or
proceeding is brought by the Trustee.
8. This Deed of Trust applies to, inures to the benefit of,' and is binding not only on the parties hereto, but on
their heirs. devisees, legatees, administrators. executors and assigns. The term BeneficiaI)' shall mean the
holder and. owner of the note secured hereby ether or not named as Beneficiary herein.
State Ofwasbj:$tp~n )
County of -:>j;.di:"'l"~-I-;:J---.-"
I certilY that I know or ave satisfactory evidence that ~M~i~'11a=:.I"J:c. p~eny:!!.!:-7-;-::-""";:---:--:="""""'-"":":-;
is/are the person(s) who appe8!ed before me, and.said person(s) acknowledged that ~ sisned this instrument and acknowle~ itio !e his free and voluiltary a.ct for the uses and p ses mentio~eu In thIS instrum<:nt.
aIed: "4" t~
File #2731
First American Title
",,'\\\\1\111/ .::$'~ .. \..EYV"I 11111/
.::: "" !I..,'''\\\\I\II, It: :: ;:y :§,oVa ~Ptt~/l I/.
E!g g"'11 ,,~R.. ...~ ... ~
.,... ""of! 0 ~ ,.,. " ~ ~I& it .'" ~ 0 ~ .,.. :::0 .. CI == L , ~~.., '~PJ='r-~ 'Z ~ . pue f5§ 1= ~ '1'1 11 ,\'b ~~'~ = 1"/ d'~'III"\\\\~'''''*''''O ~.::
1111 1"1;" OF ~ #'
tI11\\\\\\\"""
. Notary Pubh i f ashington ReS'dinga'~M~~~~~~~~~= My appointment expires
Page30f3
20080923000291.003
First American Title
File #2731
EXHIBIT 'A'
Attachment to Deed of Trust wherein Michael 1. Perry is Grantor and
Equity Network LLC is Beneficiary
DUE ON SALE CLAUSE,
20080923000291.004
It is acknowledged that all unpaid balances of principal and accrued interest together with
any unpaid late charges shall be due and immediately payable in full if Grantor sells,
conveys, or assigns Grantor's interest in any portion of the real estate herein described prior
to complete satisfaction of the debt herein described.
LATE PAYMENT PENALTY,
It is acknowledged that the late payment pen8ity is ten percelit (10%) or the payinent due if
payment is· not received within ten (10) days after its due date. Said late tee shall be paid in
addition to the regular principal and interest payment and shall not apply towatds either
principal reduction or accrued interest.
End Exhibit 'A'
J1LInitial
l1!J-Initial
First American Title
First American Title
AFTER RECQRDING, RETURN TO:
Trust Accounting Center
PO Box 730
Anacortes, WA 98221
ASSIGNMENT OF DEED OF TRUST
FileNo. 2731
Title Order No.: Ticor Title Company #6416759-1
Reference Numbers of Related Documents:
Abbreviated Legal Description:Lots I and 2, KCSPNo. 976093, Rec. NQ. 7612010798
For value received, the undersigned, hereby grants, conveys, assigns and
undivided
whose address isclo pO Box 67, Snohomish WA 98291
all beneficial interest under that certain Deed of Trust, dated September 12, 2008
executed by GRANTOR(S),
20060930000439.001
TRUSTEE,
o\Mortgages, at page __
Records of Kmg
County,
Lots 1 and 2. King County Short Plat Number 976093, recorded under Recording Number 7612010798,
in King County, Washington.
Assessor's Property Tax Parcel/Account Number: 366450-0261-04 and 366450-0260-05
Together with note or ootes therein described or referred to, the money due
and to become due thereon, with interest, and all rights accrued or to accrue under
said Deed of Trust.
State of Washington }
County of Snohomish
On this ~t.-f!::: day of y?rnbP.c . .;J.ooB. ~efore me, the undersigned, a Notary Public
in and for the State of W 1JlgtOD, duly commissioned and sworn, penonaUy appeared DONNA L.
HOUGNON to me known to be the Authorized Agent ofEQVITY NETWORK LLC the company that
executed the foregoing instrument, and acknowledged the said instrument to be the free and voluntruy
act and deed of said company, for the uses and purposes therein mentioned, and on oath stated that she
is authorized to executo the said instrument and"that the seal affixed (if any) Is the corporato seal of
said company"
SIDNEY E. DUKE.
NOTARV PUBliC
First American Title
First American Title
Electronically Recorded
20111031000972
SIMPLIFILE ADT 17.00
RETURN ADDRESS: Page 001 of 004
10/311201112:58
King County, WA
HART AND WINFREE (RNF)
P.O. BOX 210
SUNNYSIDE WA 98944
ASSIGNMENT OF DEED OF TRUST
Reference #1 of related documents: De",1 of Trust, recorded as Auditor's File
No. 20080923000291.
Reference #2 of relAted documents: Assignment of Deed of Trust, recorded as
Auditor's File No. 20080930000439.
GRANTOR:
1.
GRANTEE:
1.
EQUITY TRUST COMPANY Custodian FRO Jerry Evans IRA No. 58162,
holde,' of an undivided thirty-six percent (36%) of tire beneficial Jnterest
before the elTectlveness of this Assignment, and holde,' of an wldlvlded
elglrteen percent (18%) of tire beneficial inte,"est after' the elTectiveness of tlrls
Assignment.
EQUITY TRUST COMPANY Custodian FIlO Je,'ry Evans Roth IRA No.
90574, hoiller of 91, undivided eighteen percent (18%) of the beneficial
u,terest ofte," the elTectlveness of tills Assigrunent.
Legal Description (abbreviated): LOTS 1 & 2, KING COUNTY SHORT
PLAT NO. 976093.
Additional (complete) legal description is on page 2 ofllocumen!.
Assessor's P,"operty Tax Parcel Nos. 366450-0261-04 & 366450-0260-05
Assignml!nto/Deedo/Tl'ustIPage J of4
14 G:\Forj'e(tur/!s\Mills, Ken· Perry DOT Foreclosure #23J0253'IAsslgmnellt ojDfll!doJTrosll110J3.docx
First American Title
First American Title
For value received. the ullde.~igned as Beneficiary, Equity Tl"lIst Company Custodian
FBO Jerry Evans IRA No. 58162, holde,' of an nndlvlded thirty-six percent (36%) of the
heneficial hlterest before the effectiveness of this Assignment, and holder of an wtdlvlded
eighteen percent (18%) of the beneflclallnterest after the effectiveness of thls Assignment,
bereby grants, conveys, assigns and transfers to Equity Trust Company Custodian FBO Jerry
Evans Roth IRA No. 90574, holder of an undlvlded eighteen percent (18%) of the beneficial
Interest after the effectiveness offhls Assignment, whose address is 16801 NE 3S 1H PLACE,
BELLEVUE. WA 98008, as to an undivided eighteen percent (18%) interest under that certain
Deed of Trust, dated September 12, 2008, executed by MICHAEL J. PERRY, Grantor, to
TlCOR TITLE COMPANY, Tn.stee, and recorded on September 23, 2008, under Auditor's
File No. 20080923000291, records of King County, Washington, describing land therein as:
LOTS I AND 2, KING COUNTY SHORT PLAT NUMBER 976093,
RECORDED UNDER RECORDING NUMBER 7612010798, IN KING
COUNTY, WASHINGTON.
Assessor's Property Tax Pal'ceI Nos. 366450-0261-04 & 366450-0260-05
Together with an undivided eighteen percent (18%) interest in the note or notes therein
described or referred to, the money due and to become due thereon, with interest, nnd all rights
accrued or to accrue under said Deed ofTrus!.
.lj).
DATED this '7)/) day of October, 2011
EQUITY TRUST COMPANY CUSTODIAN FBO JERRY EVANS IRA NO. 58162. "oldel'
of an undivided thirty-six percent (36%) Interest before the effe<t1veness of this
Endorsement, and holder of an wldlvlded eighteen percent (18oio) Interest after the
effectiveness
By:
Print Nrune:tI!\,U1lj mmmtf4lt~ CI1S'1a1 iOxl !'ibo $1'j61(g t 1~·I'I\.t\()l V1Mt lll-trrt'st
Its: GAIL PRIBAN16
CORPORATE ALTERNATE SIGNER
AssigJtmeJ,t of Deed of Trust I Page 2 of 4
14 0; IF or!eltu,.esl.Mflla, Kell • Perry Dar Foreclosure N23L0253W3sigllmelll oj Deed ojTrwll110I3.docx
First American Title
First American Title
111is AssiglUnent of Deed of Trust as to an undivided eighteen percent (18%) interest ill
Ihe beneficial interest is hereby acknowledged and accepled.
i!l-
DATED this '/fJ day of October, 2011.
EQUITY TRUST COMPANY CUSTODIAN FDO JERRY EVANS ROTH IRA NO,
90574, lIolder ofRn undlvllled elgllleen pCl'cent (18%) Interest after tile efTeclivene •• oftlli.
Endorsement.
By:
P;illl Name:t}Wmwrt6llJ j>.tnij fyS-hitllo 1\ flJ;o&-q061t 1~·h.tntllvltlAd In+t'l'fst
Its: IVill PRIBANI(' . .
CORPoAAT!'! ALTERNATE SIGNER
Assignment of Deed of TrustlPage 30/4
14 G:\For/eltures'IMJIb, Ken -Perry DOT Forec/osw'e 1J2310253l4ssiIPlnlelli qfDeeJ oJTnul J11013.Jocx
First American Title
First American Title
STATE OF OHIO
COUNTY OF LORAIN
)
)ss
)
~IL PRUlANIG
I certify Ihal I know or have salisfactory evidence Ihal ___________ _
is the person who appeared before me, and said persons acknowledged that he signed this
instrument, on ~ath stated that he was authorized to execute the instrument and acknowledged it
as the n G" f Equity Trust Company Custodian FBO Jerry Evans IRA No.
58162, to be Ule free an volunlary acl of such party for Ihe uses and purposes menlioned in Ule
instnllnellt.
Daled: OClobe~ 2011.
• V :,0(' TAYLOR
-: Nocary P::l:":c. State of Ohio
• My C,:o;mmissioo Expires
Jwne 30. 2016
STATE OF OHIO
COUNTY OF LORAIN
)
) ss
)
Printed Name
I certify that I know or have satisfactory evidence that ___ CWl. __ I1_R_'_B __ ~=JC:..... __ _
is the person who appeared before me, nnd said persons acknowledged that he signed this
instn~ll:lt: oath s~ted that he was authorized to execute the instrument and acknowledged it
as th _ nbtV-~\IIr of Equity T",st Company Custodian FBO Jeny Evans Roth IRA
No.905 4, to be the free and volwltary act of such party for the uses and purposes mentioned in
the instrument.
Dated: October 1!2. 2011.
N T BLIC in nd for the
Stale o[Ohio. I . /}./)~ III
My a~intmellt expires: .l.f'-I_»=~_\.f!-",-___ _
Y.lcki Taylor
Printed Name
Assignment o/Dl!ed of Truu/Pagt 40/4
14 G:1FarJeltureslMiIls, Ken -Perry DOT Forec/oSloY! #13102J3lAssigmntnl a/Deed o/Tmsf J I JOJ3.docx
First American Title
First American Title
RETURN ADDRESS:
HART AND WINFREE (RNF)
P.O. BOX 210
SUNNYSIDE W A 98944
nCOR TITI..E
\llllllllil'IIII' ~!~A~~A~~400J~09
PAGE-001 OF 008
06/04/2011 15~~4
KING COUNTY I
lR,-\1 "'Ci)'1 APPOINTMEN1' OF SUCCESSOR TRUSTEE
Pursuant to the Revised Code of Washington, Chapter 61.24
Reference #1 of related documents:
Reference #2 of related documents:
GRANTOR:
1. PERRY, MICHAEL J.
CURRENT BENEFICIARY:
Deed of Trust, recorded under Auditor's File No.
20080923000291.
Assignment of Deed of Trust, recorded under
Auditor's File No. 20080930000439.
1. EQUITY TRUST COMPANY Custodian FBO Kenneth E. MIlls IRA No.
41888
2.
3.
4.
5.
EQUITY TRUST COMPANY Custodian FBO Jerry Evans IRA No. 58162
EVANS, TERRANCE B.
MILLS, KENNETH E.
MILLS, JESSA THA M.
SUCCESSOR TRUSTEE:
1. FABER, ROBERT N., Attorney
Abbreviated Legal Description:
TlCOR TITLE COMPANY has placed . t f record as a customer thiS documcn ° liability for thE
counesy and acceal.diP.lStynoofthe document accuracyorv 1
Lots 1 and 2, King County Short Plat
Number 976093.
Additional (complete) legal description Is on page 7 of document.
Assessor's Property Tax Parcel Number: 366450·0261·04 & 3664511-0260·05
First American Title
First American Title
.'
KNOW ALL MEN BY THESE PRESENTS:
Michael J. Pe"y, all IlIInUI"ied mon, as his separate estate, is the GRANTOR, and
Ticor Title CompallY, is the TRUSTEE, and Equity Trust Company Custodian FBO Kenneth
E. Mills IRA No. 41888, as to an untUvided Forty Five percent (45%) interest, Equity Trust
Company CustotUan FBO Jerry Evans IRA No. 58162, as to an untUvided Thirty Six percent
(36%) interest, T~ance B. Evans, a married nUln as his Separate Estate, as to all ullliivided
Fifteen percent (15%) interest, and Kenneth E. Mills alld Jessatha M. Mills, Husband and
Wife, as to an untUvided Four percent (4%) interest, is the present BENEFICIARY, under that
certain Deed of Trust dated the 12th day of September, 2008, and recorded under Auditor's File
No. 20080923000291, records of King County, State of Washington. The beneficial interest
under said Deed of Trust was assigned to the present beneficiary by assignment dated the 2611>
day of September, 2008, and recorded under Auditor's File No. 20080930000439. The property
encumbered by said deed of trust is set forth on Exhibit "A" attached hereto and incorporated by
reference.
The undersigned, who are the present beneficiaries under said Deed of Trust, desire to
appoint a new trustee in the place and stead of the original trustee named above.
NOW, THEREFORE, the undersigned hereby appoints Robert N. Faber, whose address
is 910 Franklin Avenue Suite I, Post Office Box 210, Sunnyside, Washington 98944, as
Successor Trustee under said trust deed, and said Successor Trustee shall have all the powers of
the original Trustee, effective immediately. This appointment is deemed a resignation of the
original trustee pursuant to RCW 61.24.010(2).
SIGNATURES ON FOLLOWING PAGES
First American Title
First American Title
.'
DATED: '7 -'7 -,2011.
EQUITY TRUST COMPANY CUSTODIAN FBO KENNETH E, MILLS IRA NO, 41888
UndiVi~erest BY:~ •
Print Name: .Iamle Reed
Its: '~6EPRe::;II)ENJ •
STATE OF OHIO
County of Lon~-n ) ss
)
This is to certify that on this '7 "1;y of Jo{t~ 2011 personally appeared before me
.famie Reed (Name), the 'ltCEPRES N:r (Title) of EQIDTY TRUST
COMPANY the Company that executed the within 'lnslrumenl and acknowledged the same inslrumenl to
be the free and voluntary acl and deed of said Company for the uses and purposes therein mentioned and
on oath. stated that they were authorized to execute the same and that the seal aftixed J if any, is the seal of
said Company_ GIVEN under my hand and official seal on the date above stated.
LORIOKES
Notary PubliC, State of OhIo My commIssion expIres
October 24. 2014
b6V\dQl
NOTARY PUBLIC in and for the State of Ohio.
My Appointment Expires: lo -'fp(' Itt
WfiO't45'J
Printed Name
First American Title
First American Title
"I om signing below aDd paying aD additional $50 rocordlng fee (as provided I. RCW 36.18.010 and
referred to as an emergency nonstandard document), because thi.! document does DOt meet margin aDd
forbtntting requirements. Furthermore, I bereby understand that the re~rding process may COYer up or
otberwlse obscure .ome po"::!e ten oftbe original dornm •• I ••• result ortills request."
d/1 ~ ~ Signature of Requesting Party ~~ .
Note to submitter: Do Dot ,fEn above nGl' Dav additional $50 fCfl if the document mcd!j mnrldnltot'IDattin£ requirements
" "
. --------------
First American Title
First American Title
.'
DATED: =k~=¥F:....x:.....2011.
STATE OF OHIO ) to. ' )os
Cowtly of M uJ )
Tl)is is to certify that on this ~ day of q ,n 'JJ 2011 personally appeared before me awl PBIBANIf: (Name), the -< ~ (Title) of EQllTY TRUST
COMPANY the Company that executed the within instrument and acknowledged the same instrument to
be the free and volwttary act and deed of said Company for the uses and purposes therein mentioned and
on oath stated that they were authorized to execute the same and that the seal affixed, if any, is the seal of
said Company. GIVEN under my hand and official sea on the date above. ed.
~' . )
NOTARYPUBD" .. in an 0
First American Title
First American Title
.'
~4~
TERRANCE B. EVANS
STATE OF WllStt/rVG712/IJ
COUNTY OF O/Clt-NOG 1M!
)
) 55
)
I certify that I know or have satisfactory evidence that Terrance B. Evans, a married
man as his separate estate, is the person who appeared before me, and said person
acknowledged that he signed this instrument and acknowledged it to be his free and voluntary act
for the uses and purposes mentioned in the instrument.
Dated: >Jut'!" c;, ,20 II.
NOTAR UBLIC in and for the
State of Wt?<J"flJ~ M~ APPointmj~~ Jljl!
Prmt Name: h; owl
I
First American Title
First American Title
.'
STATE OF WAfu©TON
COUNTY OF H
)
) ss
)
~;? ~< , ;;;?z ;::Q5~e!Z-
SSATHA M.LLS
I certify that I know or have satisfactory evidence that Kenneth E. Mills and Jessalha
M. Mills, husband and wife, are the persons who appeared before me, and said persons
acknowledged that they signed this instrument and acknowledged it to be their free and voluntary
act for the uses and purposes mentioned in the instrument.
Dated: j'J::3 G . 20 II.
KYLE JOSEPH MAl(
STATE OF WASIflNG'roH
NOTARY PUBLIC
I.IY COMMtSS~ EXPIRE!!
07·25011
NOTAR P LIe i d for the
State of .
My Ap intme~ Expires: Er 2)· Q.,,{(
Print N e:~ c...:1P {. tUJ,,=
First American Title
First American Title
..
EXHIBIT "A"
Legal Description
Lots 1 and 2, King County Short Plat Number 976093, recorded under recording
Number 7612010798, in King County, Washington.
Assessor's Property Tax Parcel Number: 366450-0261-04 & 366450-0260-05
First American Title
First American Title
City Of Renton
Finance Department
1055 5 Grady Way
Renton,WA 98055
Friday, April 06, 2012
NOTICE OF LIEN FOR UTILITY SERVICE
NOTICE IS HEREBY GIVEN that the City of Renton, State of Washington, has and claims a
lien for utility service charges and penalties against the following described premises
situated in Renton, King County, Washington. In addition, said lien also secures coilection
costs and future utility charges incurred against said premises.
Grantor/Reputed Owner!s): LUCILLE PERRY
Account NO.: 39295·0 Lien Amount: $498.20 (Through December 30, 2011)
Service Address: 13430 156TH AVE SE Parcel No.: 3664500261
legal: 6 lJANEnS RENTON BOULEVARD TRSPARCEll KC SP 976093AF 7612010798 SO PlAT OAF LOT 6 9LK 2 JANETTS
RENTON BLVDTRS
Pursuant to Renton Municipal Code, Title VIII, Chapter 1, 8-1-8, Chapter 2, 8-2-1, Chapter
4, 8-4-12 and Chapter 5, B-5-16, and Revised Code of Washington, Chapter 35, "Such
charges and penalties shail be a lien against the herein above described real properties."
I, Iwen Wang, Finance and Information Technology Administrator of the City of Renton
Finance/IT Division, King County, Washington, hereby certify that the above referenced
account is delinquent In the sum stated.
Iwen Wang
FIT Administrator
City of Renton
Phone: (425) 430·6852
First American Title
Page 1 of 1
First American Title
City Of Renton
Finance Department
1055 5 Grady Way
Renton, WA 98055
Friday, April 06, 2012
\ ~\\\ ~\\ \~~ \~\ \\\ \~I \\\\\ ~\\\ \~ ~~ \\~ \\\\ \I \\\~ ~~ \\~
20120423000611
RENTON cITY OF l 62.00
PAGE-0~n OF 001 04/23/2012 11:14
KING caUNTY I \J~
NOTICE OF LIEN FOR UTILITY SERVICE
NOTICE 15 HEREBY GIVEN that the City of Renton, State of Washington, has and claims a
lien for utility service charges and penalties against the following described premises
situated in Renton, King County, Washington. In addition, said lien also secures collection
costs and future utility charges incurred against said premises.
Grantor/Reputed Owner(s): LUCILLE PERRY
Account No.: 39296-0 lien Amount: $498.20 (Through December 30,2011)
Service Address: 13426 156TH AVE SE Parcel No.: 3664500260
legal: 6 2lANETTS RENTON BLVD TRSPARCEL 2 KC SP 976093Af 7612010798 SO PLAT OAF TRS TAX POR PAR EX UNO
RCW84.36.381 THRU .389 NOTINCLUDEO
Pursuant to Renton Municipal Code, Title VIIi, Chapter 1, 8-1-8, Chapter 2, 8-2-1, Chapter
4, 8-4-12 and Chapter 5, 8-5-16, and Revised Code of Washington, Chapter 35, "Such
charges and penalties shall be a lien against the herein above described real properties."
I, Iwen Wang, Finance and Information Technoiogy Administrator of the City of Renton
Finance/iT Division, King County, Washington, hereby certify that the above referenced
account is delinquent in the sum stated.
Iwen Wang
FIT Administrator
City of Renton
Phone: (425) 430-6852
First American Title
Page 1 of 1
First American Title
Fm§1I' AMERICAN
AFTER RECORDING MAIL TO:
PNW Holdings, LLC
9675 5E 36th Street, SUite 105
Mercer Island, WA 98040
Fired for Record at Request of: Spateabtl¥elhlslneforR~~seClll1
FirSt American Title Insurance Company ~URl'XSY.8BCOIIDING 0!It .
. NO LIABItm FOR VALlIll'l'Y ANlJ I OR
. A.c.GUIlACY ASSUllfJl BY PIRIIT AI/il:UCAlII Short Form 1'I'IU !Joi81JlWICl COMPAJOV .
DEED OF TRUST
File No: 4243-1901657 (BS) Date: July 3D, 2012
Grantor(s): Michael J. Perry, an unmarried man
Grantee(s): PNW Holdings, LLC, a Washington limited liability company
Trustee: First American Title Insurance Company, a Corporation
Abbreviated Legal: LOTS 1-2, KING COUNTY SP NO. 976093, REC. 7612010798, KING
COUNTY
Additional Legal on page: 1
Assessor's tax parcel/Aerount Nos: 366450-0261-04 and 366450-0260-05
THIS DEED OF TRUST, made this ThirtIeth day of July, 2012, between Michael J. Perry, an
unmarried man, as GRANTOR(S), whose address Is 13426 156th Avenue SE, Renton, WA
98055, and First American Title Insurance Company, a Corporation, as TRUSTEE, whose
address Is 11400 SE 8th St, Ste 250, Bellevue, WA 98004, and PNW Holdings, LLC, a
Washington limited liability company, as BENEFICIARY, whose address Is 9675 SE 36th
Street, Suite 105, Mercer lsland, WA 9804O.
Grantor(s) hereby Irrevocably grants, bargains, sells and conveys to Trustee In trust, with power of
sale, the following described property In King County, WashIngton:
LEGAL DESCRIPTION: Real property In the County of King, State of Washington, described as
follows:
LOTS 1 AND 2, KING COUNTY SHORT PLAT NO. 976093, RECORDED UNDER
RECORDING NO. 7612010798, IN KING COUNTY, WASHINGTON.
TOGETHER WITH all the tenements, hereditaments and appurtenances, now or hereafter
thereunto belonging or In anywise appertaining, and the rents, Issues, and profits thereof and all
other property or rights of any kind or nature whatsoever further set forth in the Master Form
Deed of Trust hereinafter referred to, SUBJECT, HOWEVER, to the right, power and authority
hereinafter given to and conferred upon Benefidary to collect and apply such rents, Issues and
prOfits.
Page 1 cf4 LPB 20-05
First American Title
First American Title
A.P,N.: 366450-o161~04 Deed of Trust M continued File No.: 4243~1901657 (8S)
THIS DEED IS FOR THE PURPOSE OF SECURING PERFORMANCE of each agreement of Grantor(s),
Incorporated by reference or contained herein and payment of the sum of two hundred fifty
thousand dollars and zero cents dollars ($250,000.00) according to the terms of the
purchase and sale agreement dated June 5, 2012 of even date herewith, payable to Beneficiary
or order and made by Grantor(s); all renewals, modifications or extensions thereof, and also SUCh
further sums as may be advanced or loaned by Beneficiary to Grantor(s), or any of his/her/their
successors or assigns, together with interest thereon at such rate as shall be agreed upon.
By executing and delivering this Deed of Trust and the Note secured hereby. the parnes agree that
all provisions of Paragraphs 1 through 35 Inclusive of the Master Form Deed of Trust herelnaiter
referred to, except such paragraphs as are specifically excluded or modified herein, are hereby
Incorporated herein by reference and made an Integral part hereof for all purposes the same as if
set forth herein at length, and the Grantor(s) hereby makes said covenants and agrees to fully
perform all of said provisions. The Master Form Deed of Trust above referred to was recorded on
the twenty·fifth (25th) day of July, 1968, in the Official Records of the offices of the COunty
Auditors of the following counties in Washington in the book, and at the page designated after the
name of each county, to-wit:
A copy of such Master Fonm Deed of Trust is hereby furnished to the person executing this Deed of
Trust and by executing this Deed of Trust the Grantor(s) acknowledges receipt of such Master
Form Deed of Trust.
The undersigned Grantor(s) requests that a copy of any Notice of Default and of any Notice of Sale
hereunder be mailed to him at the address hereinbefore set forth.
Page 2 or 4 LPB20.(J5
First American Title
First American Title
A.P.N.: 36645CH)1151-G4 Deed of Trust -Olntinued File No,; 4243-1901657 (BS)
WITNESS the hand(s) and seal(s) of the Grantor(s) on the day and year first above written.
sellers
STATE OF Idaho )
COU~ OF JjrxJ..kI'I(JA. ;-SS
On this C3 day of July, 2012, before me personally appeared Randy J. Gaidjiergis to me
known to be the Individual who executed the foregoing instrument as Attomey In Fact for Michael J.
Perry and acknowledged that he/she signed the same as his/her free and voluntary act and deed as
Attomey In Fact for said principal for the uses and purposes therein mentloned, and on oath stated that
the Power of Attomey authorizing the execution of this instrument has not been revoked and that the
said principal Is now living, and Is not Incompetent. ,
GIVEN under my hand and official seal the day and year last above written. (/J /Z2... d--. . /.
~6 fW_MU'K. r. 1(#.l[X)<Ud<./J
First American Title
SHANNON L. BRICKWEOEL
Notary Public
Stat. 01 Idaho
Page 3 of 4
Notary Public il).. and for ttle State of Idaho
Residing at: c.p i4-,1f 0
My appointment expires: lR / I ;-/15
LPB 20-05
First American Title
..
A.P.N.: 366450-0261-04 Deed of Trust • continued Rle No.: 4243-1901657 (85)
(Do Not Record)
REQUEST FOR FULL RECONVEYANCE
To be used only when all obligations have been paid under the Note and this Deed of Trust.
To: mUSTEE
The undersigned is the legal owner and holder of the note and all Indebtedness secured by the
within Deed of Trust. Said note, together with all other Indebtedness secured by said Deed of
TNst has been fully paid and satisfied; and you are hereby requested and directed, on payment to
you of any sums owing to you under the terms of said Deed of Trust, to cancel said note above
mentioned, and all other evidences of Indebtedness secured by said Deed of TNst delivered to you
herewith, together with the said Deed of TNst, and to reconvey, without warranty, to the parties
designated by the terms of said Deed of TNst, all the estate now held by you thereunder.
Mail Reconveyance to: Dated: -'-__________ _
By ___________ _
By ___________ _
By ___________ _
By ____________ _
Do not losa or desb'oy this Deed ofTrust OR ntE NOTE which It secures.
Both must be delivered to the Trustee before cancellation wlll be made.
Page 4 of4 lPB20·0S
First American Title
First American Title
:'.=
~ ""
0 ",
:-
'" ....
: =>
N .... . ~
" .-,.
~ 0
0
~, " 0
0
. ., r:-
~r-
w
~
~
,
1
:
I
I • f
I
t
1 ,
1
!
I ,
[
E
t
I , , • ;
1
!
1
I
SHO R T P L AT N 0 _'~J -"'/~":..:"::..;9:..::3~ __
S.~ T.2:2... ll.~ KI NG COUNTY, WASHINGTON
LEGAL
This &p.ce t •• ~rv.d tOI APPROVAL
TtJcrJrdtt,'5 u_e
• .:':!
Wlp.!IIrtment of PJ.annJngo and CODlClunl ty Dovcrlopment
BuIlding and Land DevoJopment Division
EXlSmnt:ld MJd approvod thIs .3....2. da!l of
Building, Land Dovelopment DIVJSJ~
DePJIrtrntmt 01 plJbJJto Werk!;
£ulI'unud and approvad this /t 7"1/ day ot
rJlod {or r~oord at the
r"quest 01:
Lue.1I1! AA t{."1
~~ ... 2h
DJI'OC'tor . .. -c./o TAiI£.''''.oJ ,:,;"'''':' DepartlllCnt 01 Asses$MCnts
d •• of
I.!.C.tt.. :.i.. /l,tJ:.r
i!L .... J~ .... .J" (rb"~~ l: •• JltUlIf!d lJnd approved £.Ius -.,'? £.If'
dc-rlEe., j!>fR. J9..zlL
Return to:
IJulUil'l9 , Land Drwolopmmt
450 KC AbrinistNti<>n Bldg
B •• ttl., ~ .. hingtcn USI0'
DESCRIPTION
HARLEY H. HOPPE
DopUf'i AJoses$or
TOTAL AR£Ar Lot 6 f Block 2, Janetta Renton aoul~Yard Tracts
as recordc:d in Volume 17. Page 60. in Kine county Washington.
PARceL '1. The South 76 feet of the ~:CGt HtO {aet.o! Lot 6.
~ R1 nton
Blockr of Janetts Boulevard Tract6.a~ recorded in Volume 17.
Pege GO, king CountJ Washington.
PARC£L .2, Lot~. Blect. Z, Janetts Renton Boulav4rd Tra'tG
as recorded in Volume 17. Page GO, King County WaBhington~
C
except the Soutn 76 feet Of tho West l~D teut.
Map 'On Filo 'n Vault J'''IJCt / 01
First American Title
;
·
< ..
J ,
:
· · · : ·
:.
.-
First American Title
I;
, • : :.
[ · i ;
~
i
1 ,
I
\
!
1 • !
I
I
i
f
t
i
I
t
!
!
t
!
I \" ,
',/, J
" I
I
:
~ I -
,
I
<
; , :
,
~
• '~2: .
,
1': I" .••
".
Cl. ~ r,
I~·""
'.
Short Pl •• 110' 9 Y "0'7 3
First American Title
I. # z!
:. , [',.< .. , ./
<D
&"11 ' ... , l. <f b,.., L .. ~ ", " , ...... "l
. '
Mtlp on File In Vault fJ
" ,.
.
,
,
Dlro"'ctlon/ Vv -.---+t----
SCAlf"
= o
First American Title
---_._-----_._-_ .. _--=---_:--:-:------~:.:-=---==-.---==--~--
!
~
1
DECLARATION:
Know nll men by these presents that we, the undersiGned, owner(s) in Icc
~impl~ (and contract purchasor(s)lof the l~nd herein described do hereby
make a short subdivision thereot pursuant to ROW 58.11.060 and doclare
this sbort plat to be the graphic representatIon of same, and that said
short sub~vislon is made with tbe free consent and in accordance with
the des1re of the owner(s).
In witnoss wboreot we h~vc set our handa and seals.
Hn. LucUl(' M. I'e.ry
Name
Name Nome
Nt .. :Ile Nome
STATE OF WASJUNG'rON,l IS.
CQLlnt"y Ol._~Y.l~,~·c,-___ 1
to 1M knOtm to bit Chit !ncUvldulil de!lcri,bed In Bnd ":.,, o,uCLIted ths tlith~ and foxogoJllg
In::tZi!lZItfnt, and ac.tnCW'ledgad that the slgnad the .,..me IJ!1 her frae IInd'voJtzntary
..... r .. md rf_d, for tho use. and pur~orcJn JnQt:Itloned. ----• _ •
01 VE~ under .lIlY hiU1d and o!lIr:JaJ seal this -!L ~V ot OctclJer .' .n12..-
--A1 ' "",-, ' Yf/-t-h-!L-.D ~_
NotarJI Pr.tblJ r: in lind far the Sr~e 'DI "i.2shJn!1ton.
TO.$ldlng at Renton '
• STA.E OF WASHINGTON,!" t -• COunty at ____ _
! I On thJs <fag pc-uonal1v dv~.rGd b%ro mo ________________ _
i ! to /lID known to bo the Jmllvldual de:ft:rlbed In and who erecutcd the within and loro~lng ! lll:ltrumcnt, Gild ,ar:A:IlWJo~S'l!d th4t ____ signed the .arm ,U ____ freo Md voluntDZ'!/
l IIct jUld deed, tor the wrcs and ~urp03o:l therojn .mcnt!onl!'d.
GIVEN undor ~ h4r1d -'lid oEflcl.IJJ Ileal this __ cIa!l oC _______ " 1' __ ,
MO-
Sbort Ph' Numbor <'176':: 2' "!
First American Title
Notery PubJir: In lind lor tho Stllto oE h'a!"hJngtoll.
residJlIg .t
"
.,
"
;.,/ .... / ... ~::.:~/.
,~' ...... :,: .. ,~.
_.,-
.,' :.". /",/'" ,//' .. ' ,'/' .. /' ....... .
,; " .' I~ 11 ." .' ... --"._ _ s.E. 128th ST.
.. ," .. / .. .. ~.
8102099006
~~. I~ ••• :: •••• ,.,... ;>4-r .-i ", "r"'(}~·'Z(;·w 1$3T.,I1 (n.tnJ 1/ fl
:-:\ .. :" .' ~"I!J~D1M ;: -:~t.~~ -~-~~DtM ·"·---·~<1/·><~/f~··::·=.;··) [r;Zr-" <. . " ~ .. """""!
.... ". ", "" ... ", ;.' ,.' ;! .,.' •. ".~ ,' ..... ,' ~ "".,'o<mll~O"",".,.I.DT"'LOCK', \··:::/:;;/:z./,)/.:.·J fE~~=-, ~
OCr-
B'" I
'.H'
-
'~:.
N""~'J~ __ ";'_.\,
-"'.\-.,(":;''' ...•. ::.
":.:~:.,
26-206
~~.~ .,./ ... /, •. ". ' .• l' -.. r..,
> .. Irl.. _,'-'7..5n ~ PT. .. ~l~:i ./ .. ~~:.~./' ~ .>' ... ;i
.;. .,t' .... ...::., """,. u. ~~ r~
··'it :::·:,,,.:·;/
.. ~, .
." -,'-
.. " ..... -...... , ..• " ... {/~~~~~:::.:~:~}
···,:,i·
.~ .. '
.. ,,; .. ;;
!!.6~(U·~/·w 1 ~:::JI t!:.:aI .~: '--;t" ... :: /:-.... - : ... -· .. ·~l.. ~; .... ---y:GENQ
S.£. .136,( ST. ,;",.tJo, ~) '.~.~';" a:.;~1 .: .::' -&L ',:,.v... -:~ ;tt;.:;:;:: 1)'1!i.Low
~~o'~A~\~~~~;:) /'>"'\ . r7
~ .. -.. _ .... -
;"co ...
~~8mzQ99~
..... ·_~flhL...l~
,,_ 26 "s,,,,y.~ ... ...-,,
WA."t'HlI ~. eUA.8TAIN
t':I.,,,,. tl. IfL~QJ1 ... JAME' & nC,C'
I.,t. "_...c-A o_ "8
...... ~n 1l1li_--"'..-. __ .......... .. ......... ___ ... ....-01 .. .......
-.. Jd III ......... ., "81M nurrHlfB .-W"" 111ft E. ('1.'6
(ooftIooIo ....J!l.'-~
~ """"'(;,~"':='"'BOU'KOARY SURvE4 .iF '" ';; . ./,/"'" .,/
""EF.5-_. -:~::'~fL-i:.:,/(·/]
First American Title
,
• I
i ,
i
J
First American Title
First American Title
:'..=
~ '"'
c:> --,
:-
'-" ....
: :::>
N ....
• J .-.
~ 0
0
'. ."7
0
0
. .,
ro-o..,
i
0-6
~
~
:
l · ,
i ,
~
I • ,
· • \
I
I
~
!
E
t
1 • • • • 1
I
1
!
SHO R T P L A T NO _'!...' ...!.·/~.c.:o:..:'j:.::3~ __
S . ...!.:!.... T. 2., ll.~ KI NG COUNTY, WASHINGTON
LEGAL
this .p~ce r ••• rved lot APPROVAL
recDrdttr'tI U_t
:' .... v
£.tIp.!Irtmcnt of PJannjn~ lind COllCunJt/J Dovolopment
BuJlding And Land DevoJopment DIvision
EJt4J:UnK and .pproVDd t.his ..!aJ2. day of
Di!p.!Irtrnent 01 PubJ1C' fior"
E)(4rrunud and appro\ltld this /t 7"" day of
'JJed {or r~t:Ord ,u. the
r"qu~t 01:
lUGII/c' AI/ I"~ "1
~~ ."zt
D'toctor .. -c./(> -rAl!.l' ........ ~& .... 1 r Dt1p.1TtIIlCnt of Asses.menf.S
do" of
,~c.~" ~l. ILtJ!.r
ilL ... ,o...,.,...J", (ror'~{ ~1C.mJnlfd lind apptovt:d Llus 4 z.II'
"'&'
Return tol
BuiUi"l1 4 Land D"".!"P" ....
450 XC Adm.i ...... ltm Bldg
S.attle, ~ .. 'ington 88704
DESCRIPTION
HARLEY H. HOPPE
TOT/;L ARtA: Lot 6.block 2. JanettD p.enton aoul~vard Tracts
as rccordtd in Volume 111 Page 60, in Kine county Washington.
PARCEL '1. The South 1ij fect of the WeGt ISO [eetto! Lot 6,
~ R~nton
Blockr of Janetts Boulevard Tracts,~5 recorded in Volume 17.
Poge 60, king Count/ Washington.
PARCtL 12t Lot 6, Block 21 JanettG Renton Bculavard Tra~tG
fta recorded in Volume 17. Page SOt King County Washington.
C
except the South 76 fect Of the West ISO fact.
&lap on Fllo In V.un /'iJfJlt J 01
First American Title
,
:
~
1
:
-.
:
" ..
First American Title
I;
, •
• ;.
;
[ ,
i
i
!
I ,
!
!
i
i
t
I
!
!
t ,
I \' ,
,I' " " Z
.P
<.. n
,
:
-
,
-i , .
,
I ,
t
4~ .
,
,,' I"."
,,0
(f, < f'\
I:"'"
"
short Pl_. /lo, 9 ;/ 6 C '7 :=
First American Title
~ *2:
:. -, l:' , .. ' ..
~"I' ~ .. 4.
, ,/
<D
\.'1I,r' L .. i .. , 1".1 •• "l 'Z
<
" .' ,
,
l.~# (. 1'01 .... " t, J" •••... ~ .....• ~. &",D "'''.~T$
Mop on File In Vault N " I DlrDctlon," Vv -... ---1----
o =
Z. .3 1'4'./U __ 0( __
:
First American Title
---=-=-.--:-------------=--=-----:-:-:------.' .. __ :......,..,.., ----"' ... "---== ~---.. ~=--
I
~
1
i
i
! ,
j
I
i ,
;
co
~
b
=> N
'""' .-
DECLARAT ION:
Know all men by these presents that we, the undersigned, owner(s) in fcc
61mplp {and contract purchn.sor(s)l of the la.nd herein descdbed do hereby
make a short subdivision tbereof pursuant to ncw 58.17.060 and doclare
this short plat to be the grarblc representation of samo, and that said
short subJivision is made with the freo consent and in accordance with
the desire of the owner(s).
In witness whereof we have set our hands and seals.
MrG. Lucl11~ H. Ferry
Nome
Nr .. :ne
STATE OF IfASlIlNGTON.l"-
countv OI_Y.l~"nc,-_-,_1
Nome
i'hune
to at! knoom to blt the 1ndJvJ.dual d_c::rlbed J.n lind ,,:.0 oxecuted tho wjthbl and t'Ql:o~J1I9
Instl'Wlllrnt. and lIc.knDlo'led!1od that ~signed the saJIe 4$ ~Iree and'voJuntary
", .. ,. ..tnd d_d, tor tblt writS and purposes tho¥oi-n mentloned. .. • '
01 VE~ under my hand lind oUlr::J.al seal thls ...!!-dill} of Oct~bCt' W " .19~
'1ft)~l'-.D ~ ____ ,
NQtlll'!/ PublJr:: in and for the St:ue'oi li:JsbJngton,
rosJ.dln9 at Reaton "
STA"i'E OF WASHINGTON,t l1.
County ot ____ _
On thJ.1I da!J J*rsoMIJ!I dl'Pellrctd baloro _________________ _
to ~ known to be the !ndJvldual descrLbed In and who eXDcutcd the u1thln and rorcgoJng
In,,trumcnt, and acJcnofllcl!,~d tb4e ___ "lgn06 c:.hlt sarru alJ ____ trt!t! .and voluntDry
.~ and deod, tor cha u.cs and purposes theTa!n mcntlaned.
GIVEN under tfI.J hand .Ind ottIt:1aJ lHlltl thlll __ cr.a!l ot _______ "' ,, __ ,
.."
Notary PubHf: In and 101' the State of W"I'h1ngton,
rcsldJng at
First American Title
",
:
To:
RE:
PR: NWEST
PNW Holdings LLC
9725 SE 36th ST STE 214
Mercer Island, W A 98040
Attention: Justin Lagers
Your Reference No.:
Property:
First American
First American Title Insurance Company
818 Stewart St, Ste 800
Seattle, WA 98101
Phone: (206)728-0400! Fax:
Final Invoice
Invoice No.:
Date:
Our File No.:
Title Officer:
Escrow Officer:
Customer ID:
Ofc: 4209 (874)
874 -420962000
08/20/2012
4209-1942808
Lavonne Bowman
5524272
13426 156th Ave SE, Renton, W A 98059
Liability Amounts
Owners:
Lendcrs: $1,000.00
Buyers: Michael Perry
Sellers:
DescriptIon of Charge Invoice Amount
Guarantee: SubdivisionIPlat Certificate
Sales Tax
INVOICE TOTAL
Comments:
Thank you for your business!
To assure proper credit, please send a copy oj this Invoice and Payment to:
Printed On: 812012012,8:18 AM
Attention: Accounts Receivable Department
818 Stewart St, Ste 800
Seattle, WA 98101
Requester: ADEC
$350.00
$33.25
$383.25
Page: 1
SADDLEBROOK PLAT
TRAFFIC IMPACT ANALYSIS
CITY OF RENTON
Prepared for
Mr. Justin Lagers·
PNW Holdings, LLC.
9675 SE 36th St., Suite 105
Mercer Island, WA 98040
Prepared by
/llf/!lifgz
TRAFFIC EXPERTS
11410 NE 124th St., #590
Kirkland, Washington 98034
Telephone: 425.522.4118
Fax: 425.522.4311
August 10,2012
City of Renton
. Planning Division
SEP -4 2012
August 10, 2012
Mr. Justin Lagers
PNW Holdings, LLC.
9675 SE 36th St., Suite 105
Mercer Island, WA 98040
Re: Saddlebrook Plat -City of Renton
Traffic Impact Analysis
Dear Mr. Lagers:
NORTHWEST TRAF"F"IC EXPERTS
11410 NE 124th SI. #590 Kirkland, WA 98034
Phone: 425.522.4118 Fax: 425.522.4311
We are pleased to present this traffic impact analysis report for the proposed 14
lot Saddlebrook Residential plat located on two parcels between 156th Ave. SE and
158th Ave. SE and north of SE 2 nd PI. in the City of Renton.
The scope of this analysis is based upon the preliminary plat site plan and the
City of Renton Policy Guidelines for Traffic Impact Analysis for New Development.
Our summary, conclusions and recommendations begin on page 5 of this report.
PROJECT DESCRIPTION
Figure 1 is a vicinity map showing the location of the site and study area.
Figure 2 shows the preliminary site plan.
The site access street runs from the 156th Ave SE to 158th Ave SE. The site
access street will have curb, gutter and sidewalk on both sides. Curb, gutter and
sidewalk will also be installed on the site frontage on 156th Ave. SE and 158th Ave. SE
as shown on the site plan.
Development of the Saddlebrook plat is expected to occur by the year 2014.
Therefore, for purposes of this study, 2014 is used as the horizon year.
Two existing single family residences within the project site will be removed with
this development.
Page 1
Saddle brook Plat
TRIP GENERA TlON AND DISTRIBUTION
The 14 single-family units in the proposed Saddlebrook Plat are expected to
generate the vehicular trips during an average weekday and during the street traffic
peak hours as shown below:
Time Period Trip Rate Trips Trips Total Trips per unit Entering Exiting
67 67
Average Weekday 9.57 134
50% 50%
AM Peak Hour 0.75 3 S 11 25% 75%
PM Peak Hour 1.01 9 5 14 63% 37%
A vehicle trip is defined as a single or one direction vehicle movement with either
the origin or destination (exiting or entering) inside the study site.
The trip generation is calculated using the average trip rates in the Institute of
Transportation Engineers (ITE) Trip Generation, Eighth Edition, for Single Family
Detached Housing (ITE Land Use Code 210). These trip generation values account for
all site trips made by all vehicles for all purposes, including resident, visitor, and service
and delivery vehicle trips.
Figure 3 shows the estimated trip distribution and the calculated site-generated
traffic volumes. The distribution is based on existing traffic volume patterns, the
characteristics of the road network, the location of likely trip origins and destinations
(employment, shopping, social and recreational opportunities), expected travel times,
and previous traffic studies.
EXISTING PHYSICAL CONDITIONS
Street Facilities
The streets in the study area are classified per the City of Renton
Comprehensive Plan as follows:
NE 4th St. (12S th St. SE)
156th Ave. SE
15Sth Ave. SE
Page 2
Principal Arterial
Minor Arterial
Local access
Saddlebrook Plat
156th Ave. SE has a speed limit of 35 mph and consists of two 12 ft. lanes and a
shoulder approximately six feet wide in the vicinity of the proiect site. There is curb,
gutter, landscape strip and sidewalk on the west side of 156t Ave SE starting in the
area approximately across from the project site running south to SE 2nd Place. There is
a left tum lane for southbound left turns from 156th Ave. SE to SE 2nd Place. 156'h Ave
SE is straight and flat at the Site Access St. with excellent sight distance in both
directions.
158th Ave SE has a speed limit of 25 mph and consists of two lanes with a
pavement width of approximately 25 ft. and unpaved shoulder. There is no curb, gutter
or sidewalk except for a section north of the project site along the east side of the street.
158'h Ave SE is straight and flat at the Site Access St. with excellent sight distance in
both directions.
EXISTING TRAFFIC CONDITIONS
Traffic Volumes
Figure 4 shows existing, future without project and future with project PM peak
hour traffic volumes at the proposed Site Access St.l156 th Ave. SE and Site Access
St.l158th Ave SE intersections. The proposal generates less than 30 PM peak hour trips
and no other intersection or street segment in the City of Renton will experience an
increase of 5% in traffic volumes due to this development. Therefore, only the Site
Access .St.l156'h Ave. SE and site Access St.l158'h Ave intersections require a level of
service (LOS) analysis per the City of Renton Policy Guidelines for Traffic Impact
Analysis for New Development, PM peak hour traffic counts were performed on 156th
Ave SE and 158,h Ave. SE on Tuesday, August 2,2012 and are included in the
Technical Appendix.
Level of Service Analysis
Level of Service (LOS) is a qualitative measure describing operational conditions
within a traffic flow, and the perception of these conditions by drivers or passengers.
These conditions include factors such as speed, delay, travel time, freedom to
maneuver, traffic interruptions, comfort, convenience, and safety. Levels of service are
given letter designations, from A to F, with LOS A representing the best operating
conditions (free flow, little delay) and LOS F the worst (congestion, long delays).
Generally, LOS A and B are high, LOS C and D are moderate and LOS E and Fare
low.
Table 1 shows calculated level of service (LOS) for existing and future conditions
including project traffic at the pertinent street intersection. The LOS was calculated
using the procedures in the Transportation Research Board Highway Capacity Manual
The LOS shown indicates overall intersection operation. At intersections, LOS is
Page 3
Saddle brook Plat
determined by the calculated average control delay per vehicle. The LOS and
corresponding average control delay in seconds are as follows:
TYPE OF A B C D E INTERSECTION
< >20.0 and Signalized 10. >10.0 and >35.0 and >55.0 and
0 ~20.0 ~35.0 ~55.0 ~80.0
Stop Sign Control ~10 >10 and ~15 >15 and ~25 >25 and ~35 >35 and ~50 .0
FUTURE TRAFFIC CONDITIONS WITHOUT THE PROJECT
Figure 4 shows projected 2014 PM peak hour traffic volumes without the project.
These volumes include the existing traffic volume counts plus background traffic growth.
The background growth factor accounts for traffic volumes generated from other
approved but unbuilt subdivisions and general growth in traffic traveling through the
area.
A 3% per year annual background growth rate was added for each year of the
two year time period (for a total of 6%) from the 2012 traffic count to the 2014 horizon
year of the proposal. The 3% per year growth rate should result in a conservative
analysis since the growth in traffic volumes has remained relatively flat the last several
years.
FUTURE TRAFFIC CONDITIONS WITH PROJECT
Figure 4 shows the projected future 2014 PM peak hour traffic volumes with the
proposed project. The site-generated PM peak hour traffic volumes were added to the
projected future without project volumes to obtain the future with project volumes.
Table 1 shows calculated LOS for future with project volumes at the study
intersections. The study intersections operate at an acceptable LOS of A and B for
future 2014 conditions including project-generated traffic.
Page 4
F
>80.
0
>50
Saddlebrook Plat
TRAFFIC MITIGA TlON REQUIREMENTS
The City of Renton requires a Transportation Mitigation Fee payment of $75 per
new daily trip attributed to new development. Two existing single family residences on
site will be removed with this development resulting in a net increase of 12 single family
homes. The net new daily trips due to this development are 115 trips (12 units x 9.57
daily trips per unit). The estimated Transportation Mitigation Impact Fee is $8,625 (115
daily trips X $75 per daily trip).
SUMMARY, CONCLUSIONS AND RECOMMENDA TlONS
We recommend that the Saddlebrook Plat be constructed as shown on the site
plan with the following traffic impact mitigation measures:
o Construct the street improvements includin~ curb, gutter and sidewalk for
site access street and site frontage on 156t Ave. SE and 158th Ave. SE.
o Contribute the approximately $8,625 Transportation Mitigation fee to the
City of Renton.
No other traffic mitigation should be necessary. If you have any
questions, please call 425-522-4118. You may also contact us via e-mail at
vince@nwtraffex.corii or larrv@nwtraffex.com.
Very truly yours,
Vincent J. Geglia
Principal
TraffEx
Page 5
Larry D. Hobbs, P.E.
Principal
TraffEx
TABLE 1
PM PEAK HOUR LEVEL OF SERVICE SUMMARY
SADDLEBROOK PLAT
TRAFFIC IMPACT ANALYSIS
, EXISTING 2014 WITHOUT 2014 WITH INTERSECTION 2012 PROJECT PROJECT
Site Access St!
156th Ave. SE. NA NA WB (B 13.8)
Site Access St!
158th Ave. SE. NA NA EB (A 8.9)
* Number shown is the average control delay in seconds per vehicle for the worst
approach or movement which determines the LOS for an unsignalized
intersection per the Transportation Research Board Highway Capacity Manual
(XX) LOS and average control delay
WB westbound approach
EB eastbound approach
Page 6
.. w .c Z " "" '" ¥ ~ w ~
.5 < z
.g 1i
'" 5 ~
'" 0 ...
PI &
----==SEJ28Ih SI.-___ -" I
NE 3td Ct
NHmt 51
SE 2nd St
SUndCt
S~ ,391h PI
Sf \l2nd 5t
SE 133td
N[ I" 51
~
" ~
SE 12811> SI ~
Sf 3Jd PI
41h PI
Sf 130th 5t ~
~
'" £
~ NE 2nd PI
~
w
'" ~ '" .c
~
SE 5th 5t
SE 7th SI
N
&
S£ 13 hI 51 ~
~
SF. 1341hSI
SEI351h 51
;;;
~
w 0.
'" ~ 0: " -'" ~ '" ~
Saddlebrook Plat -City of Renton
Vicinity Map
I'
l[/!7fdtflffxr
TRAFFIC EXPeRTS
5E 13SIh $1
Sf l!61h 51
51
Figure
1
, I
! r I 8
~ --, -I I I I I 7 I I ;
I I I I -. , ---L
I
-. , -.
I
. -
I I
I I I
6 I I I ; I 5 4
I
I
--. , -.. -.
Saddlebrook Plat· City of Renton
Site Plan
I , --, -
I I I
I I I
I 3 I I
I I
I I
I I . -'. -,
---
I
I
2
---.
-
I
I
1 I
I
I
I ,
Figure
2
"' '" ~
'<
i!:
~
.. w oS II 1Z/!:r!]t~jJ '" z ~ v ~ ~ ~ i I .10 z " ...
0 .g t' T"RArrtC EXPERTS « I I :lI ~ '" 0 '" 50% , " ~ ~ '" PI 2. ~ 20% .c ~+-3 .. -2 ~ · .:. =::-.: SE.12ath St:::=-==-·· . .. -.c , · SE lZllth 51 ~. -. --. ------NE3rdCl 4 -+ 'I -----
'#.C"') t 1 -+ ... ~ .... ~ z ~ ~ '" ~ " IS N .,
~
SE 130th St 'G'-~ « 0 ""j,t ~ lo( •• ;1;' " <fl. N ;j e ~ ~ & ~ ::: I.C) "'N SE 131st St >-l:l "" .. ~ '-j
, ~ Q ~ ~ '" N[ 2nd 51 51: U],nd Sl -5 ... ...
" '" &i Nf 2nd PI l> '" ;j -SE 133rd si I !!l ~ L.. prOjectv NE 101 PI
NE '" 51 0 Site 2 w SF. !3~lhS, " '" 1 « ~ Sf 2mi St '" SE 1351h 51 t « Sf 135th 51 .c ;;; SE 7.rui' Ct > ~ ~ SUnd PI N
w U w ~ Sf !.loth 5. '" '" ~ ~ 0:
~ ~ '" .c m ;; ,> Sf 3m PI ;<
<fl. ~ ~S~4thPI '" S
SE ~rh S. '" 0 ~ n~5thPl ~ :ll "" 'ill: 139th PI ~ .c
Iii-• «
:2 , '0 -C
N
! !!l SE 7th SI !I,~b'JO<l<! Halllh ..
o '"
I ... '-2
CD'1
I r
ON
Site Access/156th Ave
'" 0
2 J I
PM Peak Hour Traffic Volume JeD
Legend 0'"'" I Enter 9 ~ 0 15% Percentage of Project Traffic Exit 5
Total 14 Site Access 158th ave -3 PM Peak Hour Traffic Volume
Saddlebrook Plat· City of Renton
Figure
PM Peak Hour Trip Generation and Distribution 3
·C·:.,,-_-::SE"28Ih 51 -_
NE'3rd Ct
w
Z o
~
-= SE 128\h SI' ~.
j SE .130lh SI ~
NE2nd SI 5E,tl2nd 5,
w
'" ~ ;;
~ :: N C 2nd'PI -., -
SE 133ro si I ~
NE I" $, 1 Site UJ -q>' Project..... Nf 'n PI
" ~ ~ SE 2nd 51
SE2nd CI
Existing
Site Access /156th Ave
Future
without Project
Site Access 1156th Ave
~
&
5F.'!J'n 51 > ..
SE 1341h 51
5E 135\1' 51
~ ~
Project
Traffic
S ita Access 11 56th Ave
SE .,51h SI
SE 13l;lh SI
Future
with Project
Site Access 1156th Ave
Site Access 158th ave Site Access 1SBth ave Site Access 158th ave Site Access 158th ave
+-3
Saddlebrook Plat -City ot-Renton
PM Peak Hour Traffic Volumes
Legend
PM Peak Hour Traffic Volume
Figure
4
TECHNICAL APPENDIX
~ Prepared for: TraffEx
Traffic Count Consultants, Inc,
Phone: (253) 926-6009 FAX: (253) 922-7211 E-Mail: Te;:m@TC2In c.com
WBE/[)BE
Intersection: 156m Ave SE & SE 2nd PI Date 01 Count: Tues 8/0712012
Location; Rentl>o, Washington Checked By: Jess
Time From North on (SB) From South on (NS) Flam East on (W8) From West on (ES) Interval
Interval 1561hAvcSE [56th Ave 51::: SE 2nd PI SE 2nd PI Total
Ending at T L S R T L S R T L S R T L S R
4:15 P 0 l 69 l 2 l " , 0 l 0 , 0 0 , , '54
4:30 P , 2 60 3 0 2 " l 0 2 2 , 0 , 0 • III
4:4~ P • , 96 2 , • " , 0 , , l , 0 , • m
5:00 P 0 3 80 0 , , " 7 0 , , , 0 , l • [76
5:15 r • 2 '30 , 2 3 57 7 0 l 0 2 0 0 0 • 209
5:30 r 2 to "3 , , , 44 , 0 6 0 , 0 0 , • 262
5:45 P , , [7, 0 0 l "' 8 0 6 0 0 0 0 0 • 289
6:00 P 0 • [8, , , • 64 8 0 • 0 l 0 0 0 2 27'
6:15 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
(!:45 P 0 0 0 0 0 0 0 0 0 0 0 0 '0 0 0 0 0
7:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total
Survey 12 3D 98' " 8 25 .79 45 0 26 • 2l , 2 6 II 1666
Peak 1I0ur: 5:00 PM .. 6:00 PM --" -
Total 7 I 21 I 68\ f l • 1 " 1 25' 1 24 o 1 " 1 0 1 6 o 1 o 1 1 I 14 1034
~roach ", 289 25 " 1034
"101 IV 1.0% 1.4% "" "" , "
Pllf 0.89
0 -I
~ 156th Ave SE
1 965 1
GLJ ~ c~· .,p<>-l
r---·-, , 0 ,Bike
SE 2nd PI ) IlK! 1 " [:::X:::J',' SE 2nd PI
1 .. 1 ped!=~~] ~ I2sl r-2-Bike 0 " 1 "I
1 "I -"--0 .Bike
L_~.J -'-5:00 PM " 6:00 PM t"o--jred W
" I'EO.
N S £ W ;"""'''''-'1 " 1 '" 1 ,. ~ I.OPIII' Peakllour Volume Acr,,,,.· Pedi __ -,,--"
INT 01 +-f--0 Hikcl __ 9._J PIIF %IIV
INT 02 0 EB 0;'
INT 03 ---. 0 ~ ~ Check WB ",.
INT ()4 0 In: ]034 NB 1.4%
INT 05 0 1 1003 I Oul: 1034 SB 1.0%
INT 06 NO PEDS 0 156th Ave SE TIot. 0.89 1.1%
INT 07 0 6lcycl" From: N S E W ICondition~: 1
INT OS , IN101
=L..1 I
0
INT 09 0 INT02 0
INT 10 0 INT03 0
INT11 0 INT ()4 0
INT 12 0 INT 05 0
0 INT 00 0
S ccial NOles INT07 1---------0
The south leg of 1561h Ave SE was under INT08 0
construction from 4-5: 15PM. INT 09 0
INT 10 0
INT 11 0
INT 12 -,..----0
0 0 01 00
TRA12096M O1p
Prepared for TraffEx
Traffic Count Consultants, Inc.
Phone: (253) 926-6009 FAX: (253) 922-nt1 E-Ma'I: Tem@TC2inc.com
WBEIDBE
Intersection: 15~lh Ave SE & NE 1st PI Date 01 Counl: Tues 810712012
Location: Renton. Washington
Time
Interval
ErulinR at
From North on (SB)
15111h Ave SE
T L 5 R
From South on (NB) From East on (WB)
158tbAveSE NE hi PI
Checked By: Jm
From Weaton (EB)
o
TLSRTL SRTLSR
Interval
Total
4:15 P o I 10 0 0 0 3 0 0 0 0 I 0 0 0 0 15
4:3(1P r-"0-t-"'-t-"2C-r-0~r-0~r-0"-r-~4C--t-"0C-r-'0-lr--"'---t--,0--t-"2C-t-"O~-CO~t-~O~-"O~ ____ "'O~ __ i
4:4SP r-"0-t-,4-t-"')L-r-0~r-0"-r-0"-r--"3Cc-t-"0C-r-~O~r--"2---t--,0--t--C'-t-"0~-C0C-t-~0-l-"0~ ____ ~2)L-__ i
s:oop r-"0-t-"'-t~4C-r-0~r-0~r-0~r--"'c--t-"0C-r-~0-lr--"'---t--~0--t--C'-t-,0~-"0~t-~0-l-"0~ ____ l'2C-__ i
5: IS P r-"0-+..1.)-+--!8c-r-0~r-0~r-"0-+ __ 10c--+..l0c-r-~0-"r--,0,----+ __ ~0 __ t-CO~+-"0'-j-"0!-+-~°-l-"°'-j~ __ l' C' ---t
5:30 P 1--"0-+--,,0-+--:.'"' +_O~I--0~1--"0+ __ -" __ -+-"0'-1--'0-lI---,o,-+ __ "0 __ +-"2C-+-"0'-1-C0~f-'0'-1--'0'-1,-__ "14'---i
5:4SP 1--"0-+--:.'-+-"6C-1-0~I--0~1--"0-+ __ "4C--+--" __ I--~O'-I---'O'-+ __ "0 __ +--'0~+-"0'-1-C0~f-~0'-1--'0'-1I---"'2C---i
6:00P r-"0-t-"'-t-"'O~r-0~r-0"-r-"0-t--")C--t-"OC-r-~O'---r---'O'----t--"O--t--C'-t-"O~-CO~t-~O~--'O~r---"""---i
6:1SP r-"O-+-"0-t-"OCcr-0~r-"O-+-"O-+ __ lOCc-+-"OCcr-~OC-r--,OC--+ __ "O __ t-_O~+-"0'-j-"O~t-~O'-!-"0~r-__ 10C-__ i
6:30 P r-"O-+-"O-+..lOCcr-0~r-0~r-"O-+ __ lOCc-+-"OCcr-~o'---r--'O'----t __ "O __ t-_O~+-"0'-j-"O~t-~0~--'O~r-__ 10C-__ i
6:4SP f-"O-+-"O-+..lOCcr-0~r-"O-+-"O-+ __ JOCc-+--'OCcr-~o'---r--,oc--+ __ ~O __ +-_O~+-Jo'-j-CO!-+-~O,-!--'O'-!r-__ JOCc __ i
7:00P 0 (I 0 0 (I 0 0 (I 0 0 0 0 0 0 0 0 0
Tutai
Survey ()
Tutai () I 7 I 29 I 0
Approach )6
'VoHV ro,
PUF
N E W
'''''' ~.-I--' INT02
''''''
INTt14 --t 4
INT05 +-'-'-f---I :::-l-,[--:~: __ 1-_ -1....
INTIO t I--
INTII =-.-
INT12
S ecial Nutes
23
Peak Hour: 4:00 PM " 5:00 PM
01011510
,
o
o
4 ,
o
4 ,
" o
o
,
o
o
o
o
o
11
15
""
158th Ave SE
I 56 I
,------1
1 " l~.=.~.=j::e
4:00 PM '" 5:00 PM
::f~~:,--! I ~
~
158th Ave SE
BIc:yc:l .. From: N 5 E w
INTOI (I
INT 02 0
INT03._ 0
''''~III~IO INT05 0
INTD6 0
INT~ I I
INToa 0
::~ -------------:
INT II 0
INT 12 0
01
112
olojolo 60
60
", 0.0%
0_65
NE 1st PI
~ 1.0 PHF Peak Hour Volume
PHf %I{V
0.,'
'" 0111:
EB I---I----'"~ .• '----I
WB f---r---""O"~--I
60 NBr::::~=~oJ~'==l 6(1 SB~ nfa
r:;;;ii;;;;:::JT Int. 0.65 0.0%
konditio"'" I
TRA12096M 02p
HCM Unsignalized Intersection Capacity Analysis
5: Site Access St & 156th Ave SE
t
8/10/2012
~M~ov~em~e~nt~~ ______ ~W~B~L~~W~BR~~N~B~T __ ~N~BR~_S~B~L __ ~S~BT~ ________________________ ~I
Lane Configurations ¥ _ to <f
Volume (veh/h) 1 2 276 2 3 748
Sign Conirol Stop Free Free
~ra~e-_ 0%· 0%
Peak Hour Factor 0.89 0.89 0.89 0.89
Hquiiyiiow rate (vph) 1 2' 310 2
Pedestrians
L.a.ne. Wi~th (ft)
Walking Speed (ft/s)
p'?rc~n_t ~1Q.ckage
Right turn flare (veh)
M~~aDfype '
Median storage veh)
ppstre.?n1 signal (ft)
pX, platoon unblocked
"C, CODfllCting volume
vCl, stage 1 conf vol
yQ.T ~a~ 2 conf vol'
vCu, unblocked vol
tC, ~n9ie(sj
tC, 2 stage (s) iF (s) .
pO queue free %
,M ,apa9ty (vehlh)
Direction, Lane #
yol~I11~Total
Volume Left
Y()iufTl~R!ght
cSH
i£OIurii~io_ Qapacity
Queue Length 95th (ft)
Qojitroigelay(s)
Lane LOS
Apll.ro~ch Delay (s)
Approach LOS
Intersection Summary
Average Delay
j~te-rsection' Capacity l!tiliiaJlon
Analysis Period (min)
Baseline
1158 311
1158 311
6.4 --6.2
3.5 3.3
99 100
218 734
WB 1 NB 1
3 3.1g
1 0
21
410 1700
0.01 0.18 .
1 0
1~.!l· 0.0
B
13.8 0.0-
B
SB 1
~44
3
o
1259
0.00
o '0:1-.. ,
A
0.1
0%
0.89 0.89
3 '-~O
31?
-
312
4.1
2.2
100
1259
A
Synchro 7 -Report
Page 1
HCM Unsignalized Intersection Capacity Analysis
6: Site Access St & 158th Ave SE
.P ~ '\ t ! <t'
~ovement EBl EBR NBl NBT SBT SBR
lane Configurations ¥ of l>
Volume (vehlh) 2 6 f6 35 3
Sign Control Stop Free Free
Grade"" . 00;, 00/0 0'/0
Peak Hour Factor 0.65 0.65 0.65 0.65 0.65 0.65
HourlifT£w rate (vph) 3 0 g 25 54 5
Pedestrians
~ane Wfciih(ft)
WalkingJ'peed (ft/s)
Percent lllQckage
Rig~t t~rnflare (veh)
"None None 1'Aedian type
Median storage veh)
iip§tre~m signal(ft)
pX, platoon unblocked
vC, co"iiictfng volume 84 56 -S8
vC!. s~a.ge 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 84 56 58
te, sin9le (~) 6.4 6~ 4.1
tC, 2 stage (s)
tF (s) -3.5 33 .-2.2
pO queu.e free % 100 100 100
cM cap'acity (vehlh) 922 1"[16" 1556
~irection, lane # EB 1 NB 1 SB 1
Volume Tgtal 3 26 §~
Volume left 3 2 0
Volume Right 0 " 6 --5--
cSH 922 1558 1700
Y.QIUI119 t9 9ap~city QJJQ 0.9.Q _" O~03
Queue length 95th (ft) 0 0 0
ContrQfDel~y (s) 8.9 0.4 .<f·Q
lane lOS A A
Approach ~Delay (s) 8.9 0.4 0:0
Approach lOS A
Intersection Summar~
Av~~ag~_Delay 0.4
Intersll2lion Capacity Utilization. . -1330G Ic:ln~vel of~ervjce_
Analysis Period (min) 15
Baseline
A
8/10/2012
Synchro 7 -Report
Page 2
'\ --------------- - - -,
lAND USE PUBLIC HEARING S~GN~IN SHEET gJt~
Saddlebrook Prelimsnary P!at/lUA12-011 ~.9) ~
PLEASE PRINT LEGiSt Y ~
\ ADDRESS Phone # with area code V Email
NAME (including City & Zip) (optional) (optional)
.s~\\.~\'C:... .:s I\. '-\ J. e.. (' \/53t~ f I 3::106 fl . 1.:1';;) -51<.( -3R <+ 3> /
'-" /sl/3l/ 15u, AvE ;;; E
~H(}CK' f/f{L-L 17F~;,) , 7'g&>S.:;7 425-5~-oB~
~f."-Jf)CL\.j 10 ~ IGt-/ 1<5,5 VAt',MA-fllJl.-~ Nl: lifzC; .917.011 7
,
-~
-~
.
November 13, 2012
· :,
PARTIES Of RECORD
Saclldlellnook Preliminary Plat
LUA12-077, ECF, PP
Justin Lagers
PNW Holdings LLC
9675 SE 36th Street ste: #105
Mercer Island, WA 98040
tel: (206) 588-1147
eml: justin@pnwholdings.com
(applicant / contact)
Diana Nacu Palanciuc
120 Yakima Avenue NE
Renton, WA 98059
(party of record)
Updated: 10/30/12
Michael J. Perry
13436 156th Avenue SE
Renton, WA 98059
(owner)
b W~V'6 0 \~ ~ \~\% ~
Charles Mill & Cathy Deering
13434 156th Avenue SE
Renton, WA 98059
tel: (425) 306-0808
(party of record)
IS-':) V~A-U~N£
~J WtA-q~Q~'1
(Page 1 of 1)
Va~lessilDolbee
From:
Sent:
To:
Subject:
Here's her address:
HIGH, GWENDOLYN
155 Yakima Avenue NE
Renton, WA 98059
From: Vanessa Dolbee
Judith Subia
Wednesday, November 07, 2012 12:34 PM
Vanessa Dolbee
RE: Saddlebrook Preliminary Plat
Sent: Wednesday, November 07, 2012 12:29 PM
To: Stacy Tucker
Cc: Judith Subia
Subject: RE: Saddlebrook Preliminary Plat
Stacy,
--,-~,,-,,--.
I sent Gwen a PDF of the report via e-mail so I think we are ok from that stand point. Judith, once you have a chance to
give me the address, I will take it upstairs. Thank you. .
Vanessa Va{6ee
CED, x7314
From: Stacy Tucker
Sent: Wednesday, November 07, 2012 12:25 PM
To: Vanessa Dolbee
Cc: Judith Subia
Subject: RE: Saddlebrook Preliminary Plat
I've already sent the file upstairs in preparation of the hearing on Tuesday and the HEX staff report mailing was done
yesterday. Ifshe wants a copy of the report, I will have to use your copy from your file and please forward the address
for Gwendolyn up to the City Clerk's office to Cindy. Thank you.
From: Vanessa Dolbee
Sent: Wednesday, November 07, 2012 11:15 AM
To: Stacy Tucker
Subject: FW: Saddlebrook Preliminary Plat
Stacy,
Can you please add Gwendolyn High (Planning Commissioner) to the POR list for Saddlebrook Preliminary Plat. Judith I
believe has here mailing address (Judith can you please send that to Stacy?)
Thank you,
1
Vanessa ([)o{6ee
CEO, x7314
From: Gwendolyn High [mailto:gwendolynhigh@hotmail.comj
Sent: Wednesday, November 07, 2012 10:59 AM
To: Vanessa Dolbee
Subject: RE: Saddlebrook Preliminary Plat
Wait!
I though the hearing was the 13th? That is what is on my calendar.
Yes, please add me to POR. Since I am next door, doesn't that automatically add me to the POR? Since I got the
initial notice, I thought I was already on the POR.
I will read the report ASAP.
Thanks so much for the heads-up, Vanessa. I don't know.how I could have gotten the date wrong. Oh! I think I have the
notice in my bag ... Yep. It says November 13th! (attached). Shouldn't we have gotten revised notice if the date
changed?
Gwendolyn
From: VDolbee@Rentonwa.gov
To: gwendolynhigh@hotmail.com
Date: Wed, 7 Nov 2012 09:00:55 -0800
Subject: Saddlebrook Preliminary Plat
Gwendolyn,
I do not have your name on the party of record (POR) list for the subject subdivision. However, I know you live next
door and may be interested in this project. Would you like to be added to the POR list? Lastly, I thought I would
attached a copy of the Hearing Examiners Report for your information. Let me know if you have any questions.
Have a great day,
'Vanessa Cf)o{6ee
Senior Planner
Department of Community & Economic Development
City of Renton
Renton City Hall -6th Floor
1055 South Grady Way
Renton, WA 98057
425.430.7314
2
PROJECT ....... E
o
,
! i '" !'
,
l r
"
;g
.. ~ I, ,., ~ i 01 . , i i-' In
, ! ' ~
.. , ~ :A , ,
~; .... ~ ~i~ ,,-I
:::tJ
r~ ""'" , ~
, ri ,
!i .... ' --
!' " ;
......,
~ , ~
,
Be ....
,. ~
! I:; t.) 11
,
Ii" -, I'"'"" '"
'\\ j ~ !'1
~ '"
~,
r<
/-" , " i' ~
_.-___ .... JO_ ...
!IIIII: II"" . " II"
V> rn
-0
I ....
-0 0
~~
::l -, 0 .3-
0::0 <' ('I)
(ii' ::l -, .... o 0
::J ::l
8
SADDLEBROOK
'0
Ii,
\_: ~ " " §!
;;:
Ci
" ~ " " ~
'"
@)(I
(J~ ,
! q~ ; i I~ ~
II
!
III!I! ~ ail~U~~ ~
jjlli i
Ii £ ~
.. ~tI ..... ~ ~
i", ,
./ ,
i
,
i
._._._._._._._._._._,.-_.--'--_._._._._.
,
V> rn
-0
I ....
, . . , ., ,
.,
I .. " I II
-, , ,
, , , , , , ,
., . ,
I
I i
!
I
i
I 6
" 0 w no i <D • W
-' g .,
Ul
..
.~
'!....!.!!< .. ~
........ JJ
~ ~r :: ~".:.~~i.:
, .. ....,~nfi
~ .. "" ,,-,,7'.,
~""'""'<llr
.~\¥ O.R.STRONG
CONSUL T1NG ENGiNEERS ---_ .. -... --.-... -"_.lOUF __ •
I I I I I :.p' I
5 I I 4 I I i3 I I I I I I uan: ..... I I UQ.C'<_" I I vaa ••• ,,' I I I I I I I I L ____ ...J L ___
r-----,
I I
I I
I I 12 11
r.Fan:..... I I '.Fen __
I I
I I I L ____ ...1 L ____ ...1
L __
13
----'
-, 1----,
I I
I I
I I
I I
I I
I I
City of Renton
Planning Division
SEP - 4 2011
®
NORTH
~~ '_'$" GO!
d.QJ
ItiJiJ
<OJ
ItiJiJ = ~
©l
J>
J z z
, 1)0 nr:+ 5'<
1 1 1 5 ' 0
i '-~ ~ ::c
.~
'::J
!.~ • .....
Ii; : ~ 0
::J
@ II '. ~
1;Jj
Al" i S2 =i ..,,-<
1 00 z~
f
;~~ ~~g i~~ ~o
~~
~
II ,-
"
!~i5® l! ~
• I
,
1
-.-.-
r----
I
J
J
I L _____ _
r------,
I • J
J i J
I ~ ~ I
J • I
L_
, .I , j'
.~ ~
J ! J
L J ______ --1
,------l
I ;;: )
~ ~ ,
I __ J
SADOLEBROOK
r--::,----l·
I ~ """ I
J ! '. I
Ii'" ". I
J' I
L _____ ',J
r-----
I
J
I
J
,
! ..
!
. ----
!
I
i
, " , 0
, 0
i il5
" "' ~
" " «
Vl
NE 1/4 SECTION 14. TOWNSHIP 23 N. RANGE 5 E. W.M ..
'--r---' ---,~-~.::.:~ -J-r--~-r""-' , -::;--::::: .~ _~l·-~ -... ; _.--~l~:~'" ~~Io _!',-:'ti--,-----=-------=-. r' -,JT 1:-: . .. "" . ----,-.. , ' " -~f-----".~:.-:::rt--1---....L _~ ~I IT ljjJtl'±ll---1~~-[:-l~
-+---l-----1·-----1 -r--t-+--+----l .
I.!!'>-_
ROAO -A"
City Of Renton
Planning DiViSion
~
D.R.STRONG
CONSULTING ENGINEERS
...... = ~-..:::-:..=..
SfP -41012
fPd~({;~O~~©
Am CITY OF SADDLEBROOK
PREUMINARY PLAT
-~ L...W IJI
\1I'CH_30FT.
~.
L..J ~
'lNOIoIOFT.
~
01-21-12 jJ 16),' . 00I._g..,.-. ..... c:ra @ ~ RENTON ROAD PROFllE AND CROSS SECTION DETAILS . \Y
.. L ",'1' ---... -----a ___ • __ ... ~
-~
8Y 10.<.11:1_1_"",
I .: . .':. I :... ... ~
~-()opL
i
I
I
!
L
-'" I 8 , '" 3 <D
g; ~
" ~
NE 1/4 SECTION 14. TOWNSHIP 23 N. RANGE 5 E. W.M ..
]-I j-=r=J-=-: ____ ~'~~~c~-'--O----' --<--~r~=~--==~~,TI~-J---:--:~_:_~--I---~_-
I
15'6m A NUE 5£
JU ff
! I ! I I I -,-----,." , ", QI~ wt-1#+
.C---j I I 1 I ~. 4-L I I I I
I I I I I I ;~ ___ J---L-±=t--L-L-J---I -
! j----~ --_.----
,--II I I--+--I .. .j
158m A Vf'NU£ S£
--~ ...
, """'·30Fr.
-~ L-J ~
'"",_IUFT. -
.ff.l __ 00I2-,o.,.-.V .. CIg
~~ti~ "".\7 ---
DR. STRONG
CONSUL TlNG ENGINEERS
-~-_ .. -....... --... -P ..... T.-~_J<Q
~ ~~
.,.
-;;;;---
-..
11'1' II».TtIAPPRI~
~-
I L:'::::' I
... ..... 4. 1WF.0f
I ,,. -I:-~-'
I, , i
! ' . I~I I~
'·="£7/JI . -1/= .----... -_.
=..~
"'"l iii = =" .-,
~,-""",,-.. --
t-.. .,.,.......cao ....... '"" .....
(11"--"'''''''·1'''' \~ItI1Ot __ '"
:.:s' =-.,,~~...:-:.
:" .... ~"":~~
EAST HAlF 156TH AVf ~f&
J!:IJ~, . "I" !
N70
,'''-.-1
"'=~ ~~
•. ........""""",J
(".-~-,,/ .. --...-\<I'L'HPROaf_ ..... _ ...... _--""". -....-_ .... a:utSQ
,r-...so;.,.... ...... , .. J -_ ... -. """'**
~ '-&.s.~-
,.,:=,---,_ ... .....,
=..~..:.
!!!'Sf HAlf 158'" A\f" i{~ity of Renton
Planning Division
@ am CITY OF
~ RENTON
_""'IIf3uiO;ng/Pu",'" "or .. o.pl
SEP --4 lOll
~~CG~nW'~ff»
SADDLEBROOK
PREUMINARY PLAT
ROAD PROFILE AND CROSS SECTION DETAILS
IAI-IN!
It.-"
f...-;;-..-
· '" , 0
~ ~ ~ o o « <n
NE 1/4 SECTION 14. TOWNSHIP 23 N. RANGE 5 E. W.M ..
~~-'-:!ll::: ___ lLWll ~:l.JaJ _ JIT I t\~ ~lli:rl U llL W f -\ -Ir=
~ -4i~ !-r-I I J rit= IT* I! iii I I it IU i rrr~I'3drnsT1tD ~ I "HtaHrl r-
l ! ! 11 f-~-"'SHT-~~
c::::: I J1SF-Yfjl I 1, r-
--'1 -~~. t--LJ" -1 I-Ih I I ,~ I, J=-c!:::!: i-p I r-! ~ ~'~"~r-Ie-
, ~ ---"'1~"-:::'.j :I R ~i r-I' I Ii/, ,! !Ul 111~r i
'-J.-I~/f I 1_ I ,. ~ II 1
I >JF)If= RIc-' 1 1 ' I r-,--l~ ~Ll * -jj§, 1-~ 1 I§] II : jj;t ~IH I I I" r ~r--r-~ fr=---'----fr= ~ -1 i ~"Jt--I _Jfi, _ruB 1\ \ \ I \[ l l,~~8~11 I J'f l~i=M'~ l' =m ' II ~H~ I IIIIR+-lr\ IWrQIRIl
City of Renton
Planning Division
SEP -4 2011
~[grG[gOW'[g[Q)
NOTE: ......... _"" .... ___ ... _on. __ """',.,._,
J:l J~ D.R.STRONG
CONSULTING eNGINEERS -------... ---... -0_.-'___ .
~ ~
-.. ........
-..
BY I o..rr 1"""'1--..., --
~~-,I@ -"'-I ~ CITY OF ~ RENTON
I .. -:.. I IWIM ~~ _ DopL
SAODLEBROOK
PREUMINARY PLAT
NEK3Ii!lOROOOO OETAI. MAP
®
NORTH
SADDLEBROOK
~ eo ~
,~
.~ !~
~ ~
~
i
I
5ADtUBI<OOK
,
,
" il
, '. . ~~ ... "'c. !' i
.' ". ~,~
"~ ~~
U~a
156THAVE SE a;j~
,
~§1Ji .
f~
~L,
!~
'''l •• n
, . ,
,
I
I,
I--
I
-I
,I
I
I
I
I'
-I
I
• •
I
I
• ,.
I'
...
C, ·h. of Renton \., , ' ' n
Planning OIVISIO •
I , . ~ •
" S£? -4 10\1
'.
I '
. 1805 -136TH PLACEN,E" SUITE 201 BELLEVUE,W.A 98005
, PHONE (425) 284-3300 OR (425) 449-4704' fAx (425) 449-4711 •
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PREPARED FOR
PNW HOLDINGS, LLC
June 28, 2012
Revised August 21,2012
-=::--' C~~~~~;~~~~;;;;:>~ __ ___ -------Stephen H. Avril
Staff Geologist
Kyle R. Campbell, P.E.
Principal
GEOTECHNICAL ENGINEERING STUDY
PROPOSED RESIDENTIAL DEVELOPMENT
SADDLEBROOK
13426 -156TH AVENUE SOUTHEAST
RENTON, WASHINGTON
ES-2441
Earth Solutions NW, LLC
1805 _136 th Place Northeast, Suite 201
Bellevue, Washington 98005
Phone: 425-449-4704 Fax: 425-449-4711
Toll Free: 866-336-8710
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-Important Information About Your
leal Report
-Subsurface plOD/ems are a prmc/pal cause of cons/lUc/lOn deliys, cost overruns, claims, and disputes .-The following mformatlon IS plOvlded to help you manage your (Jsks
Geotechnical Services Are Performed 101'
Specific Purposes, Persons, and Projects
Geotechnical engineers structure their services to meet the specific needs of
their clients, A geotechnical engineering study conducted for a civil engi-
neer may not fulfill the needs of a construction contractor or even another
civil engineer. Because each geotechnical engineering study is unique, each
geotechnical engineering report is unique, prepared so/e/yfor the client No
one except you should rely on your geotechnical engineering report without
first conferring with the geotechnical engineer who prepared it And no one
-no/even you -should apply the report for any purpose or project
except the one originally contemplated.
Read tile Full Report
Serious problems have occurred because those relying on a geotechnical
engineering report did not read it all. Do not rely on an executive summary.
Do not read selected elements only.
A Geotechnical Engineering Report Is Based on
A Unique Set 01 Project-SpecUic Factors
Geotechnical engineers consider a number of unique, project-specific fac-
tors when establishing the scope of a study. Typical factors include: the
client's goals, objectives, and risk management preferences; the general
nature of the structure involved, its size, and configuration; the location of
the structure on the site; and other planned or existing site improvements,
such as access roads, parking lots, and underground utilities. Untess the
geotechnical engineer who conducted the study specifically indicates oth-
erwise, do not rely on a geotechnical engineering report that was:
o not prepared for you,
o not prepared for your project,
o not prepared for the specific site explored, or
o completed before important project changes were made.
Typical changes that can erode the reliability of an existing geotechnical
engineering report include those that affect:
o the function of the proposed structure, as when it's changed from a
parking garage to an office building, or from a light industrial plant
to a refrigerated warehouse,
o elevation, configuration, location, orientation, or weight of the
proposed structure,
o composition of the design team, or
o project ownership.
As a general rule, a/ways inform your geotechnical engineer of project
changes-even minor ones-and request an assessment of their impact
Geotechnica/ engineers cannot accept responsibility or liability for problems
that occur because their reports do not conSIder developments of which
they were not inlormed.
Subsurllce COnditions Can Change
A geotechnical engineering report is based on conditions that existed at
the time the study was pertormed. Do not rely on a geotechnical engineer-
ing report whose adequacy may have been affected by: the passage of
time; by man-made events, such as construction on or adjacent to the site;
or by natural events, such as floods, earthquakes, or groundwater fluctua-
tions. Always contact the geotechnical engineer before applying the report
to determine if it is still reliable. A minor amount of additional testing or
analysis could prevent major problems.
iVlost Geotechnical Andings Are Prolesslonal
Opinions
Site exploration identifies subsurtace conditions only at those points where
subsurtace tests are conducted or samples are taken. Geotechnical engi-
neers review field and laboratory data and then apply their professional
judgment to render an opinion about subsurtace conditions throughout the
site. Actual subsurtace conditions may differ-sometimes significanUy-
from those indicated in your report. Retaining the geotechnical engineer
who developed your report to provide construction observation is the
most effective method of managing the risks associated with unanticipated
conditions.
A Report's Recommendations Are IUtIt Final
Do not overrely on the construction recommendations included in your
report. Those recommendations are not final, because geotechnical engi-
neers develop them principally from judgment and opinion. Geotechnical
engineers can finalize their recommendations only by observing actual
subsurtace conditions revealed during construction. The geotechnical
engineer who developed your report cannot assume responsibility or
liability for the report's recommendations if that engineer does not perform
construction observation.
A Geotechnical EngJneerlng Report is SUbject to
Misinterpretation
Other deSign team members' misinterpretation of geotechnical engineering
reports has resulted in costly problems. Lower that risk by having your geo-
technical engineer confer with appropriate members of the design team after
submitting the report. Also retain your geotechnical engineer to review perti-
nent elements of the design team's plans and specifications. Contractors can
also misinterpret a geotechnical engineering report. Reduce that risk by
having your geotechnical engineer participate in prebid and preconstructibn
conferences, and by providing construction observation.
Do Not Redraw the EngJneer's n.ogs
Geotechnical engineers prepare final boring and testing logs based upon
their interpretation of field logs and laboratory data. To prevent errors or
omissions, the logs included in a geotechnical engineering report should
never be redrawn for inclusion in architectural or other design drawings.
Only photographic or electronic reproduction is acceptable, but recognize
that separating logs from the report can elevate risk.
Give Contractors a Complete Report and
Guidance
Some owners and design professionals mistakenly believe they can make
contractors liable for unanticipated subsurlace conditions by limiting what
they provide lor bid preparation. To help prevent costly problems, give con-
tractors the complete geotechnical engineering report, but preface it with a
clearty written letter of transmittal. In that letter, advise contractors that the
report was not prepared for purposes of bid development and that the
report's accuracy is limited; encourage them to confer with the geotechnical
engineer who prepared the report (a modest fee may be required) and/or to
conduct addilional study to obtain the specific types of infonmation they
need or prefer. A prebid conference can also be valuable. Be sure contrac-
tors have sufficient time to pertonm additional study. Only then might you
be in a position to give contractors the best information available to you,
while requiring them to at least share some of the financial responsibilities
stemming from unanticipated conditions.
Read Responsibility Provisions Closely
Some clients, design professionals, and contractors do not recognize that
geotechnical engineering is far less exact than other engineering disci-
plines. This lack of understanding has created unrealistic expectations that
have led to disappointments, claims, and disputes. To help reduce the risk
of such outcomes, geotechnical engineers commonly include a variety of
explanatory provisions in their reports. Sometimes labeled "limitations'
many of these provisions indicate where geotechnical engineers' responsi-
bilities begin and end, to help others recognize their own responsibilities
and risks. Read these provisions closely. Ask questions. Your geotechnical
engineer should respond fully and frankly.
Geoemllronmental Concerns JUte iIIot ClDverelB
The equipment, techniques, and personnel used to pertorm a geoenviron-
mental study differ significantly from those used to pertorm a geotechnical
study. For that reason, a geotechnical engineering report does not usually
relate any geoenvironmental findings, conclusions, or recommendations;
e.g., about the likelihood of encountering underground storage tanks or
regulated contaminants. UnantiCipated environmental problems have led
to numerous project failures. If you have not yet obtained your own geoen-
vironmental information, ask your geotechnical consultant for risk man-
agement guidance. Do not rely on an environmental report prepared for
someone else.
Obtain Professional ASSistance Yo Deai wItID iVlold
Diverse strategies can be applied during building design, construction,
operation, and maintenance to prevent significant amounts of mold from
growing on indoor surtaces. To be effective, all such strategies should be
devised for the express purpose of mold prevention, integrated into a com-
prehensive plan, and executed with diligent oversight by a professional
mold prevention consultant. Because just a small amount of water or
moisture can lead to the development of severe mold infestations, a num-
ber of mold prevention strategies focus on keeping building surtaces dry.
While groundwater, water infiltration, and similar issues may have been
addressed as part of the geotechnical engineering study whose findings
are conveyed in·this report, the geotechnical engineer in charge of this
project is not a mold prevention consultant; none of the services per-
formed in connection with the geotechnical engineer's study
were designed or conducted for the purpose of mold preven-
tion. Proper implementation of the recommendations conveyed
in this report wi/l not of Itself be sufficient to prevent mold from
growing in or on the strocture Involved.
Rely, on Vour ASFE-iVlember Geotechncial
. Engineer lor Additional Assistance
Membership in ASFE!The Best People on Earth exposes geotechnical
engineers to a wide array of risk management techniques that can be of
genuine benefit for everyone involved with a construction project. Confer
with you ASFE-member geotechnical engineer for more information.
ASFE
fbi 0111 PDDPII on IDrib
8811 Colesville RoadlSuite G106, Silver Spring, MD 20910
Telephone: 301/565-2733 Facsimile: 301/589-2017
e-mail: info@asfe.org www.asfe.org
CopyrlOht 2004 by ASFf, Inc. Duplication. reproduction, or copying of this document, In whole or in pari, by any means whatsoever. is strictly prohibited, except with ASFE's
specific written permission. Excerpting, quoting, or otherwise extnJcting wording from this document is permitted only with the express written permiSSion of ASFE, and only for
purposes of scholarly research or book review. Only members of ASFE may use this document as a complement to or as an element of a geotechnical engineering repOri. Any other
firm, individual, or ather entity that so uses this document without beIng an ASFE member could be committing negligent or intentional (fraudulent) misrepresentation.
IIGER06045.0M
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
June 28,2012
Revised August 21,2012
ES-2441
PNW Holdings, LLC
9675 Southeast 36th Street, Suite 105
Mercer Island, Washington 98040
Attention: Mr. Justin Lagers
Dear Mr. Lagers:
Earth Solutions NW LLC
• Geotechnical Engineering
• Construction Monitoring
• Environmental Sciences
Earth Solutions NW, LLC (ESNW) is pleased to present this report titled "Geotechnical
Engineering Study, Proposed Residential Development, Saddlebrook, 13426 -156th Avenue
Southeast, Renton, Washington". In general, the site is underlain by layers of topsoil and fill
soil transitioning to native soils consisting primarily of firm sandy glacial till deposits. Loose
topsoil was observed at all the test locations in variable thicknesses ranging from four inches to
twenty-eight inches. In our opinion, the proposed residential buildings can be supported on
conventional continuous and spread footing foundations bearing on competent native soils, re-
compacted native soils, or structural fill. Competent soils suitable for support of foundations
should be encountered at depths of between one to three feet below existing grades at most
locations. Where loose or unsuitable soil conditions are exposed at foundation subgrade
elevations, compaction of the soils to the specifications of structural fill, or overexcavation and
replacement with a suitable structural fill material will be necessary.
Light groundwater seepage was observed at the majority of test pit locations. The seepage
was observed to be perched at the glacial till contact. In our opinion, light perched seepage
should be expected during grading activities.
Recommendations for foundation design, site preparation, drainage, and other pertinent
recommendations are provided in this study. We appreciate the opportunity to be of service to
you on this project. If you have questions regarding the content of this geotechnical
engineering study, please call.
Sincerely,
EARTH SOLUTIONS NW, LLC
~~ ..
Stephen H. Avril
Staff Geologist
1805 -136lh Place N.E., Suite 201 • Bellevue, WA 98005 • (425) 449-4704 • FAX (425) 449-4711
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE OF CONTENTS
ES-2441
INTRODUCTION .................................................................. .
General ..................................................................... .
Project Description ...................................................... .
SITE CONDITIONS ................................................................. .
Surface ....................................................................... .
Subsurface .................................................................. .
Fill. ................................................................... .
Topsoil. ............................................................. .
Native Soil ......................................................... .
Geologie Setting ................................................. .
Groundwater ................................................................ .
DISCUSSION AND RECOMMENDATIONS ................................. .
General ....................................................................... .
Site Preparation and General Earthwork .......................... .
Wet Season Grading ............................................ .
In-situ Soils ................................................................... .
Imported Soils .............................................................. .
Structural Fill. ............................................................... .
Foundations ............................................................... .
Seismic Design Considerations ..................................... .
Slab-On-Grade Floors ................................................... .
Retaining Walls ........................................................... .
Drainage .................................................................................. .
Infiltration ...................................................................... .
Excavations and Slopes ......................................................... .
Utility Trench Backfill. ................................................... .
Pavement Sections ...................................................... .
LIMITATIONS ....................................................................... .
Additional Services ...................................................... .
Earth Solutions fNV. LLC
PAGE
1
1
1
2
2
2
2
2
3
3
3
3
3
4
5
5
5
5
6
6
6
7
7
7
8
8
8
9
9
I
I
I TABLE OF CONTENTS
I Cont'd
ES-2441
I
GRAPHICS
I PLATE 1 VICINITY MAP
I PLATE 2 TEST PIT LOCATION PLAN
PLATE 3 RETAINING WALL DRAINAGE DETAIL
I PLATE 4 FOOTING DRAIN DETAIL
I APPENDICES
I Appendix A Subsurface Exploration
Test Pit Logs
I Appendix B Laboratory Test Results
I
I
I
I
I
I
I
I Earth Solutions NW. LLC
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
General
GEOTECHNICAL ENGINEERING STUDY
PROPOSED RESIDENTIAL DEVELOPMENT
SADDLEBROOK
13426 -156TH AVENUE SOUTHEAST
RENTON, WASHINGTON
ES-2441
INTRODUCTION
This geotechnical engineering study was prepared for the proposed residential development to
be constructed east of 156 th Avenue Southeast and north of Southeast 2nd Place in Renton,
Washington. The purpose of this study was to explore subsurface conditions across the site
and develop geotechnical recommendations for the proposed development. Our scope of
services for completing this geotechnical engineering study included the following:
o Conducting subsurface explorations within accessible portions of the development
envelope;
o Laboratory testing of soil samples obtained from the subsurface exploration;
o Engineering analyses, and;
o Preparation of this report.
The following documents/maps were reviewed as part of our report preparation:
o Preliminary Site Plan prepared by D.R. Strong Consulting Engineers dated June 15,
2012;
o Geologic Map of the Renton Quadrangle, Minard 1965, and;
o King County USDA Soil Conservation Survey (SCS).
Project Description
We understand the subject site will be developed with 14, single family residences, access
roadways, and associated utility improvements. The remainder of the site will be developed
with general landscaping and a storm water retention pond. We anticipate the residential
structures will be constructed near existing site grades using a slab-on-grade configuration.
Grading activities will likely involve cuts and fills of less than ten feet to establish the final design
grades. Stormwater will be conveyed to a retention pond located in the southeastern portion of
the subject site.
BUilding construction is anticipated to consist of relatively lightly-loaded wood framing and slab-
on-grade floors. Perimeter foundation loading is expected to range from approximately one to
two kips per foot. Slab-on-grade loading is expected to be on the order of 150 psf.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PNW Holdings, LLC
June 28,2012
Revised August 21,2012
ES-2441
Page 2
If the above design assumptions are incorrect or change, ESNW should be contacted to review
the recommendations in this report. ESNW should review the final design to confirm that our
geotechnical recommendations have been incorporated into the plans.
SITE CONDITIONS
Surface
The site is located on the east side of 156th Avenue Southeast, and north of Southeast 2nd
Place in Renton, Washington. The approximate location of the property is illustrated on Plate 1
(Vicinity Map) included in this study. The site is rectangular in shape and consists of several
adjoining tax parcels. The site is currently occupied by a single family residence and
outbuildings at the west side of 156th Avenue Southeast. The majority of the east side of the
subject site is being used as a horse paddock. The site is bordered to the north by existing
residential parcels, to the east by Yakima Avenue Southeast, to the south by residential
development, and to the west by 156th Avenue Southeast.
The existing site topography generally descends gently to the east as a result of past grading
activities; with elevation change on the order of less than ten feet. Vegetation across the site
consists primarily of field grass.
Subsurface
An ESNW representative observed, logged and sampled six test pits excavated using a
trackhoe and operator provided by the client. The approximate locations of the test pits are
depicted on the Test Pit Location Plan (Plate 2). Please refer to the test pit logs provided in
Appendix A for a more detailed description of the subsurface conditions. The soil conditions
within the proposed development envelope consist primarily of firm native glacial till-type
deposits overlain by topsoil and layers of silty sand fill soil in variable thicknesses.
Fill
Fill was encountered during our fieldwork at all test locations except at test locations TP-2 and
TP-3; where the topsoil layer was observed to be approximately 24 to 28 inches thick. Fill was
observed at all other test locations which consisted of medium dense silty sand (Unified Soil
Classification SM). The fill soil transitioned to dense to very dense silty sand with gravel (SM)
weathered glacial till material at the remainder of the test locations. The fill was observed in
thicknesses ranging from one and a half to two feet.
Topsoil
Topsoil was encountered at all test pit locations extending to depths of between about nine to
twenty-eight inches. Areas of thicker topsoil are likely the result of past grading activities
where organic laden material was spread over the site for leveling purposes throughout usage
as a cattle/horse pasture. Topsoil is not suitable for use as structural fill nor should it be mixed
with material to be used as structural fill. Topsoil or otherwise unsuitable material can be used
in landscaping areas if desired.
Earth Solutions NW. LLC
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PNW Holdings, LLC
June 28,2012
Revised August 21, 2012
Native Soil
ES-2441
Page 3
In general, underlying the fill and topsoil, dense to very dense native silty sand with gravel (SM)
was encountered extending to the maximum termination depth of about six feet below existing
grades. The native soil consists of weathered glacial till transitioning to unweathered glacial till
material.
Geologic Setting
The referenced geologic map resource identifies Vashon subglacial till (Qvt) deposits across
the site and surrounding areas. The referenced SCS soil survey identifies Alderwood gravelly
sandy loam series soils across the entirety of the site. Alderwood soils formed in glacial till and
typically present a slight to moderate erosion hazard and slow to medium runoff.
The soil conditions observed at the test pit locations are generally consistent with glacial till
deposits.
Groundwater
Perched groundwater was observed at several test pit locations during the fieldwork (June
2012). Perched seepage should be anticipated in general site excavations at the contact
between the weathered and unweathered glacial till material. Groundwater seepage rates and
elevations fluctuate depending on many factors, including precipitation duration and intensity,
the time of year, and soil conditions. In general, groundwater flow rates are higher during the
wetter, winter months.
DISCUSSION AND RECOMMENDATIONS
General
In our opinion, construction of the proposed residential development is feasible from a
geotechnical standpoint. The proposed residential buildings can be supported on conventional
continuous and spread footing foundations bearing on competent native soils, re-compacted
native soils, or structural fill. Slab-on-grade floors should be supported on dense native soil or
structural fill. Competent soils suitable for support of foundations should be 'encountered at
depths of between one to three feet below existing grades. Where loose or unsuitable soil
conditions are exposed at foundation subgrade elevations, compaction of the soils to the
specifications of structural fill, or overexcavation and replacement with a suitable structural fill
material will be necessary. Organic fill should be removed and replaced with structural fill.
Recommendations for foundation design, site preparation, drainage, and other pertinent
geotechnical recommendations are provided in the following sections of this study.
This study has been prepared for the exclusive use of PNW Holdings, LLC and their
representatives. No warranty, expressed or implied, is made. This study has been prepared in
a manner consistent with the level of care and skill ordinarily exercised by other members of the
profeSSion currently practicing under similar conditions in this area.
Earth Solutions NW, LLC
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
pNw Holdings, LLC
June 28,2012
Revised August 21, 2012
Site Preparation and Earthwork
ES-2441
Page 4
Site preparation activities will involve removal of existing structures, site clearing and stripping,
and implementation of temporary erosion control measures. The primary geotechnical
considerations associated with site preparation activities include building pad subgrade
preparation, underground utility installations, and preparation of pavement subgrade areas.
Temporary construction entrances and drive lanes, consisting of at least 12 inches of quarry
spalls can be considered in order to minimize off-site soil tracking and to provide a stable
access entrance surface. Erosion control measures should consist of silt fencing placed. along
the down gradient side of the site. Soil stockpiles should be covered or otherwise protected to
reduce soil erosion. Temporary sedimentation ponds or other approaches for controlling
surface water runoff should be in place prior to beginning earthwork activities.
Topsoil and organic-rich soil was encountered generally within the upper approximately nine to
twenty-eight inches at the test pit locations. Topsoil and organic-rich soil is not suitable for
foundation support, nor is it suitable for use as structural fill. Topsoil or organic-rich soil can be
used in non-structural areas if desired. Over-stripping of the site, however, should be avoided.
A representative of ESNW should observe the initial stripping operations, to provide
recommendations for stripping depths based on the soil conditions exposed during stripping.
Subgrade conditions expected to be exposed throughout the proposed building and pavement
areas will likely be comprised of silty sand deposits. Loose organic or otherwise unsuitable
material should be removed from foundation areas and replaced with structural fill. After the
completion of site stripping and rough grading activities ESNW recommends a proofroll utilizing
a fully loaded solo dump truck in order to determine the suitability of the exposed native soils for
support of foundations and roadways. ESNW should be retained during this phase of
earthwork to observe the proofroll and other earthwork activities.
The soils exposed throughout subgrade areas should be compacted to structural fill
speCifications prior to constructing the foundation, slab, and pavement elements. The subgrade
throughout pavement areas should be compacted as necessary and exhibit a firm and
unyielding condition when subjected to the proofrolling with a loaded solo dump truck.
Structural fill soils placed throughout foundation, slab, and pavement areas should be placed
over a firm base. Loose or otherwise unsuitable areas of native soil exposed at subgrade
elevations should be compacted to structural fill requirements or overexcavated and replaced
with a suitable structural fill material. Where structural fill soils are used to construct foundation
subgrade areas, the soil should be compacted to the requirements of structural fill described in
the following section.
Foundation subgrade areas should be protected from disturbance, construction traffic, and
excessive moisture. Where instability develops below structural fill areas, use of a woven
geotextile below the structural fill areas may be required. A representative of ESNW should
observe structural fill placement in foundation, slab, and pavement areas.
Earth Solutions NW, LLC
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PNW Holdings, LLC
June 28,2012
Revised August 21, 2012
Wet Season Grading
ES-2441
Page 5
The high moisture sensitivity of the site soils expected to be exposed during excavations will
make grading during periods of rain and/or snow difficult or impossible. Mass grading should
take place during the late summer months when conditions are more favorable. If grading
takes place during the wetter winter or spring months, a contingency in the project budget
should be included to allow for export of native soil and import of structural fill as described
below.
In-situ Soils
The soils encountered throughout the majority of the test sites have a high sensitivity to
moisture and were generally in a moist condition at the time of the exploration (June 2012). In
general, soils encountered during site excavations that are excessively over the optimum
moisture content will require moisture conditioning (aeration) prior to placement and
compaction. Conversely, soils that are below the optimum moisture content will require
moisture conditioning through the addition of water prior to use as structural fill. If the in-situ
soils are determined to not be suitable for use as structural fill, then use of a suitable imported
soil may be necessary.
Imported Soils
Imported soil intended for use as structural fill should consist of a well graded granular soil with
a moisture content that is at or near the optimum level. During wet weather conditions,
imported soil intended for use as structural fill should consist of a well graded granular soil with
a fines content of 5 percent or less defined as the percent passing the #200 sieve, based on the
minus three-quarter inch fraction.
Structural Fill
Structural fill is defined as compacted soil placed in foundation, slab-on-grade, and roadway
areas. Fills placed to construct permanent slopes and throughout retaining wall and utility
trench backfill areas are also considered structural fill. Soils placed in structural areas should
be placed in loose lifts of 12 inches or less and compacted to a relative density of 90 percent,
based on the laboratory maximum dry density as determined by the Modified Proctor Method
(ASTM 0-1557). Soil placed in the upper 12 inches of slab-on-grade, utility trench, and
pavement areas should be compacted to a relative compaction of at least 95 percent.
Additionally, more stringent compaction specifications may be required for utility trench backfill
zones, depending on the responsible utility district or jurisdiction.
Earth Solutions f'NV. LLC
I
I
I
I
I
I
I
I
I
I
I
I
I
!I
I
I
I
I
I
PNW Holdings, LLC
June 28,2012
Revised August 21, 2012
Foundations
ES-2441
Page 6
Based on the results of our study, the proposed residential structures can be supported on
conventional spread and continuous footings bearing on competent native soils, re-compacted
native soils, or structural fill. Based on the soil conditions encountered at the test sites,
competent native soils suitable for support of foundations should be encountered at depths of
between one to three feet below existing grades. Where loose or unsuitable soil conditions are
exposed at foundation subgrade elevations, compaction of the soils to the specifications of
structural fill, or overexcavation and replacement with structural fill, may be necessary. If
subgrade conditions warrant, a woven geotextile fabric should be placed at the subgrade prior
to placement of structural fill.
Provided foundations will be supported as described above, the following parameters can be
used for design of new foundations:
o Allowable soil bearing capacity 2,500 psf
o Passive earth pressure 350 pet (equivalent fluid) ,
o Coefficient of friction 0.4
A one-third increase in the allowable soil bearing capacity can assumed for short-term wind and
seismic loading conditions. The above passive pressure and friction values include a factor-of-
safety of 1.5. With structural loading as expected, total settlement in the range of one inch and
differential settlement of about one-half inch is anticipated. The majority of the settlements
should occur during construction, as dead loads are applied.
Seismic Design Considerations
The 2009 International Building Code specifies several soil profiles that are used as a basis for
seismic design of structures. Based on the soil conditions observed at the test sites, Site Class
D, from table 1613.5.2, should be used for design. In our opinion, the site is not susceptible to
liquefaction based on the relative density of the native soils and the lack of a shallow
groundwater table.
Slab-en-Grade Floors
Slab-on-grade floors for residential buildings constructed at this site should be supported on a
firm and unyielding subgrade. Where feasible, the existing native soils exposed at the slab-on-
grade subgrade level can be compacted in place to the specifications of structural fill. Unstable
or yielding areas of the subgrade should be recompacted or overexcavated and replaced with
suitable structural fill prior to construction of the slab. A capillary break consisting of a minimum
of four inches of free draining crushed rock or gravel should be placed below the slab. The free
draining material should have a fines content of 5 percent or less (percent passing the #200
sieve, based on the minus three-quarter inch fraction). In areas where slab moisture is
undesirable, installation of a vapor barrier below the slab should be considered. If a vapor
barrier is to be utilized it should be a material specifically designed for use as a vapor barrier
and should be installed in accordance with the manufacturer's specifications.
Earth Solutions NW, LLC
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PNW Holdings, LLC
June 28,2012
Revised Aug ust 21, 2012
Retaining Walls
ES-2441
Page 7
Retaining walls must be designed to resist earth pressures and applicable surcharge loads.
The following parameters can be used for retaining wall design:
o Active earth pressure (yielding wall)
o At-rest earth pressure (restrained wall)
o Traffic surcharge for passenger vehicles
(where applicable)
o Passive resistance
o Coefficient of friction
o Seismic surcharge
35 pcf (equivalent fluid)
55 pcf
70 psf (rectangular distribution)
350 pcf (equivalent fluid)
0.4
6H (where H equals retained height)
Additional surcharge loading from adjacent foundations, sloped backfill, or other loads should
be included in the retaining wall design. Drainage should be provided behind retaining walls
such that hydrostatic pressures do not develop. If drainage is not provided, hydrostatic
pressures should be included in the wall design.
Retaining walls should be backfilled with free draining material that extends along the height of
the wall, and a distance of at least 18 inches behind the wall. The upper one foot of the wall
backfill can consist of a less permeable soil, if desired. A perforated drain pipe should be
placed along the base of the wall, and connected to an approved discharge location. A typical
retaining wall drainage detail is provided on Plate 3.
Drainage
Perched groundwater should be anticipated in site excavations. Temporary measures to
control surface water runoff and groundwater during construction would likely involve
interceptor trenches and sumps. ESNW should be consulted during preliminary grading to
identify areas of seepage and to provide recommendations to reduce the potential for instability
related to seepage effects.
In our opinion, foundation drains should be installed along building perimeter footings. A typical
foundation drain detail is provided as Plate 4.
Infiltration
Based on the presence of glacial till (hardpan) deposits and perched groundwater, in our
opinion infiltration on the site or individual lots is not feasible.
Earth Solul;ons NW. LLC
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PNW Holdings, LLC
June 28,2012
Revised August 21, 2012
Excavations and Slopes
ES-2441
Page 8
The Federal Occupation Safety and Health Administration (OSHA) and the Washington
Industrial Safety and Health Act (WISHA) provide soil classification in terms of temporary slope
inclinations. Based on the soil conditions encountered at the test pit locations, the weathered
native soils encountered in the upper approximately three feet of the test pit locations and
where fill and/or groundwater seepage is exposed are classified as Type C by OSHAIWISHA.
Temporary slopes over four feet in height in Type C soils must be sloped no steeper than
1.5H: 1V (Horizontal:Vertical). Dense native soils encountered below about three feet and
where no groundwater seepage is exposed would be classified as Type A by OSHAIWISHA.
Temporary slopes over four feet in height in Type A soils must be sloped no steeper than
0.75H:1V. The presence of perched groundwater may cause caving of the temporary slopes
due to hydrostatic pressure. ESNW should observe site excavations to confirm the soil type
and allowable slope inclination are suitable for the exposed soil conditions. If the
recommended temporary slope inclination cannot be achieved, temporary shoring may be
necessary to support excavations.
Permanent slopes should maintain a gradient of 2H:1V, or flatter, and should be planted with
vegetation to enhance stability and to minimize erosion. A representative of ESNW should
observe temporary and permanent slopes to confirm the slope inclinations, and to provide
additional excavation and slope recommendations, as necessary.
Utility Support and Trench Backfill
In our opinion, the soils anticipated to be exposed in utility excavations should generally be
suitable for support of utilities. Organic or highly compressible soils encountered in the trench
excavations should not be used for supporting utilities. The native soils are moisture sensitive
and will therefore be difficult to use as structural trench backfill if the moisture content of the soil
is high. Moisture conditioning of the soils will likely be necessary prior to use as structural
backfill. Utility trench backfill should be placed and compacted to the specifications of structural
fill provided in this report, or to the applicable City of Renton specifications. Groundwater·
seepage should be anticipated within utility trench excavations. Caving of the trench sidewalls
due to hydrostatic pressure may occur and temporary shoring may be necessary.
Pavement Sections
The performance of site pavements is largely related to the condition of the underlying
subgrade. To provide adequate pavement performance, the subgrade should be in a firm and
unyielding condition when subjected to proofrolling with a loaded dump truck. Structural fill in
pavement areas should be compacted as recommended in the "Site Preparation and
Earthwork" section of this report. It is possible that soft, wet, or otherwise unsuitable subgrade
areas may still exist after base grading activities. Areas of unsuitable or yielding subgrade
conditions will require remedial measures such as overexcavation, placement of a geotextile
and thicker crushed rock or structural fill sections prior to pavement.
Earth Solutions NW. LLC
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PNW Holdings, LLC
June 28,2012
Revised August 21, 2012
ES-2441
Page 9
For lightly loaded pavement areas subjected primarily to passenger vehicles, the following
preliminary pavement sections can be considered:
o Two inches of hot-mix asphalt (HMA) placed over four inches of crushed rock base
(CRB), or;
o Two inches of HMA placed over three inches of asphalt treated base (ATB).
For relatively high volume, heavily loaded pavements subjected to moderate to high, loaded
truck traffic, the following preliminary pavement sections can be considered:
o Three inches of hot-mix asphalt (HMA) placed over six inches of crushed rock base
(CRB), or;
o Three inches of HMA placed over four and one half inches of asphalt treated base
(ATB).
The HMA, ATB and CRB materials should conform to WSDOT specifications. All soil base
material should be compacted to at least 95 percent of the maximum dry density. Final
pavement design recommendations can be provided once final traffic loading has been
determined.
If areas of seepage are exposed in roadway excavations, drains should be installed in these
areas to allow removal of the water. Specific recommendations and details for roadway
drainage can be provided upon request.
LIMITATIONS
The recommendations and conclusions provided in this geotechnical engineering study are
professional opinions consistent with the level of care and skill that is typical of other members
in the profession currently practicing under similar conditions in this area. A warranty is not
expressed or implied. Variations in the soil and groundwater conditions observed at the test
locations may exist, and may not become evident until construction. ESNW should reevaluate
the conclusions in this geotechnical engineering study if variations are encountered.
Additional Services
ESNW should have an opportunity to review the final deSign with respect to the geotechnical
recommendations provided in this report. ESNW should also be retained to provide testing and
consultation services during construction.
Earth Solutions NW, LLC
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.1
Reference:
• 1 \&4T~ A,V st
King County, Washington
Map 657
By The Thomas Guide
Rand McNally
32nd Edition
Vicinity Map
Saddlebrook -13426 -156th Avenue S.E.
Renton, Washington
NOTE: This plate may contain areas of color. ESNW cannot be Drwn. GLS Date 06/27/2012 Proj. No. 2441
responsible for any subsequent miSinterpretation of the information
resulting from black & white reproductions of this plate. Checked SHA Date June 2012 Plate 1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
:-----1----IIT~-~-I--------I ------------I
-0-
uJ
vi
1 :1
: 8 7 1 6
I I I I
I I I
~ '------1_ _ _ I. 1
5 4 3 2 1 I
I
TP-41 I -o-J.
1 ~ I 1 --------
I TP-1
-D-TP-2
LEGEND
TP-1-0
1
1
-Approximate Location of
ESNW Test Pit, Proj. No.
ES-2441, June 2012
---I
1 I Subject Site L __ _
12 Proposed Lot Number
NOTE: The graphics shown on this plate are not intended for design
purposes or precse scale measurements, but only to illustrate the
approximate test locations relative to the approximate locations of
existing and f or proposed site features. The information illustrated
is largely based on data provided by the client at the time of our
study. ESNW cannot be responsible for subsequent design changes
or interpretation of the data by others.
NOTE: This plate may contain areas of color. ESNW cannot be
o 50
m
1"=100' LI
1 00 200
U Scale in Feet
uJ
vi
IJ..J
::J
as
~
:r:
I-
00
!:Q
Test Pit Location Plan
Saddlebrook -13426 -156th Avenue S.E.
Renton, Washington
responsible for any subsequent misinterpretation of the information DlWn. GLS Date 08/13/2012 Proj. No. 2441
resulting from blacl< & white reproduclions of this plate.
Checked SHA Date Aug. 2012 Plate 2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
18" Min. <l~-I
0°0000 °00
0<> 0 0° «) <> cO 0 0 0
'" 00 0 00
<> 0 obo 0°0 <> 0 000 °0° ~
00 0 <> 0 0 <> 0 <>
o 0 0 0 o <> 0 0° 0 '0 °0 <>
o 00 <> 0
o 0
<> 0 0 00()
00 <> <>
o <> 0° ~
NOTES:
o Free Draining Backfill should consist
of soil having less than 5 percent fines.
Percent passing #4 should be 25 to
75 percent.
Structural
Fill
o Sheet Drain may be feasible in lieu
of Free Draining Backfill, per ESNW
recommendations.
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAWING
o Drain Pipe should consist of perforated,
rigid PVC Pipe surrounded with 1"
Drain Rock.
LEGEND:
Free Draining Structural Backfill
1 inch Drain Rock RETAINING WALL DRAINAGE DETAIL
Saddlebrook -13426 -156th Avenue S.E.
Renton, Washington
Drwn. GLS Date06/28/2012 Proj. No. 2441
Checked SHA Date June 2012 Plate 3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Slope
Il> · . · . . . . . · ..... · . . . .. .. · ..... · . . . . . · .... . · .... . · .... . · .... . · .... . · .... .
-~
2" (Min.)
Perforated Rigid Drain Pipe
(Surround with 1" Rock)
NOTES:
o Do NOT tie roof downspouts
to Footing Drain.
o Surface Seal to consist of
"'" .",_"'.r/' ............. rI'-".".",.", .......... "". "'.". .... ". .............
12" of less permeable, suitable
soil. Slope away from building.
LEGEND:
Surface Seal; native sailor
other low permeability material.
1" Drain Rock
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAWING
FOOTING DRAIN DETAIL
Saddlebrook -13426 -156th Avenue S.E.
Renton, Washington
Drwn. GLS Date 06/28/2012 Proj. No. 2441
Checked SHA Date June 2012 Plate 4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
APPENDIX A
SUBSURFACE EXPLORATION
ES-2441
The subsurface conditions at the site were explored by excavating a total of six test pits across
accessible portions of the property. The subsurface explorations were completed on June 14,
2012. The approximate test pit locations are illustrated on Plate 2 of this report. Logs of the
test pits are provided in this Appendix. The test pits were excavated to a maximum depth of six
feet below existing grades.
Earth Solutions NW. LLC
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Earth Solutions NWLLC
SOil CLASSIFICATION CHART
IIIlAJOR DIVISIONS TYPICAL
DESCRIPTIONS
COARSE
GRAINED
SOILS
MORE THAN SO'll
OF MATERIAL IS
LARGER THAN
NO. 200 SIEVE
SIZE
FINE
GRAINED
SOILS
MORE THAN 50%
OF MATERIALIS .
SMALLER THAN
NO. 200 SieVE
SIZE
GRAVEL
AND
GRAVELLY
SOILS
MORE THAN 50%
OF COARSE
FRACTION
RETAINED ON NO.
4 SIEVE
SAND
AND
SANDY
SOILS
MORE THAN 50%
OF COARSE
FRACTION
PASSING ON NO.
4 SIEVE
SILTS
AND
CLAYS
SILTS
AND
CLAYS
CLEAN
GRAVELS
(LITTLE OR NO FINES)
GRAVELS WITH
FINES
(APPRECIABLE
AMOUNT OF FINES)
CLEAN SANDS
(LITTLE OR NO FINES)
SANDS WITH
FINES
(APPRECIABLE
AMOUNT OF FINES)
LIQUID LIMIT
LESS THAN SO
UQUIDLIMIT
GREATER THAN SO
HIGHLY ORGANIC SOILS
GW
GP
GM
GC
SW
SP
SM
SC
ML
CL
OL
MH
CH
OH
PT
WELL-GRADED GRAVELS. GRAVEL-
SAND MIXTURES. LITTLE OR NO
FINES
POORLY-GRADED GRAVELS.
GRAVEL -SAND MIXTURES. LITTLE
OR NO FINES
SILlY GRAVELS. GRAVEL -SAND-
SILT MIXTURES
CLAYEY GRAVELS. GRAVEL -SAND-
eLA Y MIXTURES
WELL-GRAOED SANDS, GRAVELLY
SANDS. LITTLE OR NO FINES
POORLY-GRADED SANDS.
GRAVELLY SAND. LITTLE OR NO
FINES
SILlY SANDS. SAND -SILT
MIXTURES
CLAYEY SANDS. SAND -CLAY
MIXTURES
INORGANIC SILTS AND VERY FINE
SANDS. ROCK FLOUR. SILlY OR
CLAYEY FINE SANDS OR CLAYEY
SILTS WITH SLIGHT PLASTICITY
INORGANIC CLAYS OF LOW TO
MEDIUM PlASTICITY, GRAVELLY
CLAYS, SANDY CLAYS. SILTY
CLAYS, lEAN CLAYS
ORGANIC SILTS AND ORGANIC
SILlY CLAYS OF LOW PLASTICITY
INORGANIC SILTS. MICACEOUS OR
DIATOMACEOUS FINE SAND OR
SllTY$OILS
INORGANIC CLAYS OF HIGH
PLASTlCrrY
ORGANIC CLAYS OF MEDIUM TO
HIGH PlASTICITY. ORGANIC SILTS
PEAT. HUMUS. SWAMP SOILS WITH
HIGH ORGANIC CONTENTS
DUAL SYMBOLS are used to indicate borderline soil classifications.
The discussion in the text of this report is necessary for a proper understanding of the nature
of the material presented in the attached logs.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I N
iii
Ii!
is
'" I ~
" .... z
<5
a:
'" I i
~
~ ~
~
I c:
I
~
~ w z
I w
'"
Earth Solulions NW TEST PIT NUMBER TP-1 • 1805 136th Place N.E., Suite 201 PAGE 1 OF 1
Bellevue, Washington 98005
Telephone: 425-284-3300
CLIENT PNW Holdings
PROJECT NUMBER 2441
DATE STARTED 6/14/12 COMPLETED
EXCAVATION CONTRACTOR Client Provided
EXCAVATION METHOD
LOGGED BY SHA CHECKED BY
NOTES Depth of Topsoil & Sod 12": field grass
w a.
r ~ffi ~¢? WID
w-.J::;;
Q A." ~z
TESTS
0
MC = 30.40% ~
SM
Me= 10.40% 3.0
SM
4.0
6/14/12
PROJECT NAME Saddlebrook -13426 -156th Avenue S.E.
PROJECT LOCATION Renton, Washington
GROUND ELEVATION ~5",0",5C!.fI,--__
GROUND WATER LEVELS:
TEST PIT SIZE ______ _
AT TIME OF EXCAVATION -.:-=-'-__________ _
SHA ATENDOFEXCAVATlON-.:-~ ____________ _
AFTER EXCAVATION
MATERIAL DESCRIPTION
TOPSOIL
Brown silty SAND with gravel, medium dense to dense, moist (Fill)
Brown silty SAND with gravel, very dense, moist (Weathered Till)
-light iron oxide staining
Test pit terminated at 4.0 feet below existing grade. No groundwater encountered during
excavation.
Bottom of test pit at 4.0 feet.
504.0
502.0
501.0
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Earth Solutions NW
1805 136th Place N.E., Suite 201
Bellevue, Washington 98005
Telephone: 425-284-3300
CLIENT PNW Holdings
PROJECT NUMBER
DATE STARTED -'62!./1.!.'4!C/1!.<2'-__ _ COMPLETED -,6~/1~4L.!/1£2 __ _
EXCAVATION CONTRACTOR ..lC,dli'!!e!!!ntuP:rrQ'ov(!!id;!le!l!d'--______ _
EXCAVATION METHOD ______________ _
LOGGED BY -'S!!:H~A'__ ___ _ CHECKED BY -'S"'HA= ___ _
NOTES Depth of Topsoil & Sod 22"-24"; field grass
w
"-
J: ~ffi h:i2' wID
w--':2
Q "-::>
::Oz ..:
(J)
TESTS
vi
ti
vi
::>
TEST PIT NUMBER TP-2
PAGE 1 OF 1
PROJECT NAME Saddlebrook -13426 -156th Avenue S.E.
PROJECT LOCATION
GROUND ELEVATION ~5",0",5-"fl~ __
GROUND WATER LEVELS:
TEST PIT SIZE _____ _
ATTIMEOFEXCAVATION~~ __________ ___
ATENDOFEXCAVATION~~ ___________ _
AFTER EXCAVATION -
MATERIAL DESCRIPTION
SM
-perched seepage
-becomes very dense
MC = 10.00%
seepage
Bottom of test pit at 5.0 feet.
I
I
I
I
I
I
•
Earth Solutions NW
1805 136th Place N.E., Suite 201
Bellevue, Washington 98005
Telephone: 425-284-3300
CLIENT PNW Holdings
PROJECT NUMBER 2441
DATE STARTED -'6"""'14!!.'-"12'---__ _ COMPLETED -'6"-'1 .... 4"-"1£2 __ _
EXCAVATION CONTRACTOR ~C"I",ie"-n"-t.<:P"ro"v"id,,,e,,,d ________ _
EXCAVATIONMETHOD _______________ _
LOGGED BY -'S"'HA=-_____ _ CHECKED BY -'S"'H"'A"---__ _
NOTES Depth of Topsoil & Sod 2.5': field grass
W
0.
J: ~ffi ~= w'" TESTS w---'::0
0 0.::>
::Oz «
'" 0
0 CIi
<3 I" 0.0 CIi ~--' :j "
• , .' TOPSOIL
!,'~
TPSL<'II"
~-~
,I 1.1, ~ 2.5
TEST PIT NUMBER TP-3
PAGE 1 OF 1
PROJECT NAME Saddlebrook -13426 -156th AVenue S.E.
PROJECT LOCATION Renton, Washington
GROUND ELEVATION -,5",0",5-"ft~ __
GROUND WATER LEVELS:
TEST PIT SIZE _____ _
AT TIME OF EXCAVATION -==--___________ _
AT END OF EXCAVATION -= ______________ _
AFTER EXCAVATION --
MATERIAL DESCRIPTION
502.5
Brown silty SAND with gravel, very dense, moist (Weathered Till)
SM
•. 0
-light perched seepage
Test pit terminated at 6.0 feet below existing grade. Groundwater seepage encountered
at 2.5 feet during excavation.
Bottom of test pit at 6.0 feet.
499.0
I • Earth Solutions NW TEST PIT NUMBER TP-4
1805 136th Place N.E .• Suite 201 PAGE 1 OF 1
Bellevue, Washington 98005
Telephone: 425-284-3300
CLIENT PNW Holdings PROJECT NAME Saddlebrook -13426 -156th Avenue S.E. I
PROJECT NUMBER 2441 PROJECT LOCATION Renton, Washington
DATE STARTED 6/14/12 COMPLETED 6/14/12 GROUND ELEVATION 505 ft TEST PIT SIZE
EXCAVATION CONTRACTOR Client Provided GROUND WATER LEVELS: I
EXCAVATION METHOD AT TIME OF EXCAVATION
LOGGED BY SHA CHECKED BY SHA AT END OF EXCAVATION -I
NOTES Del2th of To~soi1 & Sod 9": field grass AFTER EXCAVATION -
UJ <1. U :r: ~ffi ui I(!) ~= UJIn TESTS <.i <1.0 MATERIAL OESCRIPTION UJ--':::E ui ~-' 0 <1.::>
:::Ez ::> (!) « Ul
0
I
I
, , , TOPSOIL
TPSL". ,II,
504.0 .-:-1.0
SM~ Brown silty SAND with gravel, medium dense, moist (Fill) I
2.0 503.0
I MC = 14.70%
Brown silty SAND with gravel, very dense, moist (Weathered Till)
-very light seepage
SM
4.5 -becomes unweathered 500.5
Test pit terminated at 4.5 feet below existing grade. Groundwater seepage encountered I
at 2.5 feet during excavation.
I Bottom of test pit at 4.5 feet.
I
I
I
I
N
iii
iii
e-I
o
'" on :>
e-z
<3 I
~
'" ;;
~ N
~
~ ~ I
~ c:
r
~
~
~ I
w z w
'" I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Earth Solutions NW
1805 136th Place N.E., Suite 201
Bellevue, Washington 98005
Telephone: 425-284-3300
CLIENT PNW Holdings
PROJECT NUMBER
DATE STARTED --,6,,-/1,,4!C/1!..<2~ __ _ COMPLETED -,6,,-1,,14!!./1!..<2~ __ _
EXCAVATION CONTRACTOR -,C"-I",ie,,,n,,-t .::P"ro"v"id"e"d _______ _
EXCAVATION METHOD ______________ _
LOGGED BY -'S"'HJ!A"-____ _ CHECKED BY -'S"'H"'A'-__ _
NOTES Depth of Topsoil & Sod 4": field grass
w a.
I ~ffi u; u
[2 wID u IC)
-'::E u; 0.0 w-~-' 0 a.'" ::Ez '" C) « (J)
TEST PIT NUMBER TP-5
PAGE 1 OF 1
PROJECT NAME Saddlebrook -13426 -156th Avenue S.E.
PROJECT LOCATION
GROUND ELEVATION -'5,,0"'5-"11'--__
GROUND WATER LEVELS:
TEST PIT SIZE _____ _
AT TIME OF EXCAVATION -='--__________ _
AT END OF EXCAVATION -='--___________ _
AFTER EXCAVATION -
MATERIAL DESCRIPTION
Brown silty SAND with gravel, very dense, moist (Weathered Till)
SM
Test feet below existing grade. No groundwater
Bottom of test pit at 3.5 feet.
during excavation.
I
I • Earth Solutions NW TEST PIT NUMBER TP-6
1805 136th Place N.E .• Suite 201 PAGE 1 OF 1
Bellevue, Washington 98005
Telephone: 425-284-3300
CLIENT PNW Holdings PROJECT NAME Saddlebrook -13426 -156th Avenue S.E.
I
PROJECT NUMBER 2441 PROJECT LOCATION Renton, Washington
DATE STARTED 6/14/12 COMPLETED 6/14/12 GROUND ELEVATION 505 It TEST PIT SIZE
EXCAVATION CONTRACTOR Client Provided GROUND WATER LEVELS:
I EXCAVATION METHOD AT TIME OF EXCAVATION -
LOGGED BY SHA CHECKED BY SHA AT END OF EXCAVATION -
NOTES De~th of T oQsoil & Sod 8": grass AFTER EXCAVATION -
I
I
w a. U >-<1: u; J: I-w Ie> 1--wID 0 a.¢: 0.0 MATERIAL DESCRIPTION w-...J::!! u; ~...J 0 a.", ::i ::!!z e> < (J)
0
I
h"PSL '-' , 0.' TOPSOIL 504.5
Brown silty SAND with gravel, medium dense to dense, moist
SM
I ',3.0 -Weathered Till 502.0
Test pit terminated at 3.0 feet below existing grade. No groundwater encountered during excavation.
I
Bottom of test pit at 3.0 feet.
I
I
I
I
I
I N
" :;; ...
" " I '" " ~
" ~
" I ;
N
~ ~
\!! ;:
I !::
~
~
~
W z
I w
"
I
I
I APPENDIX B
I LABORATORY TEST RESULTS
ES-2441
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I Earth Solutions NW. LLC
I
I til Earth Solutions NW GRAIN SIZE DISTRIBUTION ' .. "
~r, 1805 -136th Place N.E., Suite 201 -~ \, 1-' I, '-_\~:', ·H Bellevue, WA 98005
Telephone: 425-284-3300
CLIENT PNW Holdings, LLC PROJECT NAME 13426156th Ave SE
I PROJECT NUMBER ES-2441 PROJECT LOCATION Renton
u.s. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER
6 4 3 2 1.5 1 ~ 1/2318 3 4 6 810 1416 20 30 40 5060 100 140200
I
100 I I r\1 I I I I I I
95
I
90
\ 85
80
I 75
70
I
I
65 t-:r: .,\ C) 60 ~ I'" >-55
'" ~ a: w 50 z
I u:
t-45 z w ir u 40 a:
I
I
I
w \ a.
35
30 1\
\
25
20 1\
~
15
10
I 5
0
100 10 1 0.1 0.01 0.001
I
I
GRAIN SIZE IN MILLIMETERS
I COBBLES 1 GRAVEL I SANO J SILT OR CLAY I coarse I fine I coarse medium I fine I
Specimen Identification Classification LL PL PI Cc Cu
g
I " w
r
" "
0 TP-3 6.0ft. Brown silty SAND with gravel, SM
:I
I 00
:> r z
" ~
Specimen Identification 0100 060 030 010 %Gravel %Sand %Sil! %Clay ..
" I " V
N
00
W
.0 TP-3 6.Oft. 19 3.02 0.252 33.5 51.9 14.6
W
N
00
I z ;:;
"
I
I
I
I
I EMAIL ONLY
I
I
I
I
I
I
I
I
I
I
I
I I
I
I I
I
REPORT DISTRIBUTION
ES-2441
PNW Holdings, LLC
9675 Southeast 36th Street, Suite 105
Mercer Island, Washington 98040
Attention: Mr. Justin Lagers
Earth Solutions WY, LLC
I
I
I
'I
••
AT EARTH SOLUTIONS 'NW ,
OUR,MISSION IS TO
I
~ HONOR OUR COMMITMENTS I
~ PROVIDE INNOVATIVE
SOLUTIONS THAT CREATE
VALUE I
~ RECOGNIZE THAT OUR
POWER AND EFFECTIVENESS l
LIES WITH OUR PEPPLE
~ TREAT ALL FAIRLY AND ' I,
HONESTLY ,
~ DEDICATE OURSELVES To I
BRINGING OUT THE BEST IN
EVERYONE
~ MAINTAIN AN ATMOSPHERE
I
OF PROFESSIONAL. FRIENDLY
CUSTOMER RELATIONS I
~ CONTINUE TO SEEK
OPPORTUNITIES FOR I
LEARNING AND GROWTH
~ MAINTMN A CLEAN,
WELL ORGANIZED WORK , II
ENVIRONMENT
~ IMPLEMENT CONSISTENT, -I
RELIABLE ACCOUNTING
PROCEDURES I
~ BE A RESOURCE TO THE
COMMUNITY I
I