Loading...
HomeMy WebLinkAboutREPORT 01CITY OF RENrl .-.- 4' DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT MEMORANDUM Date: October 11, 2013 To: City Clerk's Office From: Lisa McElrea Subject: Land Use File Closeout Please complete the following information to facilitate project closeout and indexing by the City f iprk'c C)ffirp_ Project Name: Replace Sewer Lift Station LUA (file) Number: LUA-12-091, SME Cross -References: Project Manager: Vanessa Dolbee [AKA's: Acceptance Date: November S, 2012 Applicant, Mark Clement, Boeing Owner: Boeing Contact: Mark Clement, Boeing PID Number: 0723059001 ERC Determination: Date: Appeal Period Ends: Administrative Decision: Approved Date: November 8, 2012 Appeal Period Ends: November 22 2012 Public Hearing Date: Date Appealed to HEX: By Whom: HEX Decision: Date: Appeal Period Ends: Date Appealed to Council: By Whom: Council Decision:Date: Mylar Recording Number: Project Description: The applicant is proposing to install a new sanitary sewer lift station including the vault, duplex pumps, pump controls, force main and gravity main approximately 40 feet from an existing lift station and 196 feet from the Ordinary High Water Mark (OHWM) of the Cedar River. The new lift station will replace the existing lift station 4-45. The existing lift station shall be in operation during the construction and until the new lift station if fully operational. Once the new station is fully operational the old lift station would be shut down. Location: 737 Logan Ave N Comments: ERC Determination _Types: DNS - Determination of Non -Significance; DNS -M - Determination or Non -Significance -Mitigated; DS - Determination of Significance. DEPARTMENT OF COMMUNITY#ryP 0,1 AND ECONOMIC DEVELOPMENT PLANNING DIVISION CERTIFICATE OF EXEMPTION FROM SHORELINE SUBSTANTIAL DEVELOPMENT DATE: PROJECT NAME: PROJECT NUMBER: EVALUATION FORM & DECISION November 7, 2012 Replace Sewer Lift Station LUA12-091, SME DATE 0 L1 NAME INITIAIlDATE IL PROJECT MANAGER: OWNER: CONTACT/APPLICANT: PROJECT LOCATION: Vanessa Dolbee, Senior Planner Boeing Corporation, 737 Logan Avenue N, Renton, WA 98055 Mark Clement, 737 Logan Avenue N, Renton, WA 98055 737 Logan Avenue N PROJECT DESCRIPTION: The applicant is proposing to install a new sanitary sewer lift station including the vault, duplex pumps, pump controls, force main and gravity main approximately 40 feet from an existing lift station and 196 feet from the Ordinary High Water Mark (OHWM) of the Cedar River. The new lift station will replace the existing lift station 4-45. The existing lift station shall be in operation during the construction and until the new lift station if fully operational. Once the new station is fully operational the old lift station would be shut down. The project is located within the Urban Center North 2 zone. However, the Boeing Company entered into a development agreement ("2002 agreement") on June 28, 2002, by Resolution No. 3568 which, among other things vested the subject site to 2002 Industrial Heavy (IH) zoning. The project is located in Reach A of the Cedar River, Shoreline High Intensity overlay. The subject site would be considered a non -conforming site pursuant to the Shoreline Master Program, however the subject project would not result in an increase in impervious service area or a change in building footprint. Therefore no site changes are required. Furthermore, the applicant has indicated that the project would not result in any changes to vegetation. -a"{ DEPARTMENT OF COMMUNITY �y�,,"' I f r I AND ECONOMIC DEVELOPMENT PLANNING DIVISION CERTIFICATE OF EXEMPTION FROM SHORELINE SUBSTANTIAL DEVELOPMENT EVALUATION FORM & DECISION DATE: November 8, 2012 PROJECT NAME: Replace Sewer Lift Station PROJECT NUMBER: LUA12-091, SME PROJECT MANAGER: Vanessa Dolbee, Senior Planner OWNER: Boeing Corporation, 737 Logan Avenue N, Renton, WA 98055 CONTACT/APPLICANT: Mark Clement, 737 Logan Avenue N, Renton, WA 98055 PROJECT LOCATION: 737 Logan Avenue N PROJECT DESCRIPTION: The applicant is proposing to install a new sanitary sewer lift station including the vault, duplex pumps, pump controls, force main and gravity main approximately 40 feet from an existing lift station and 196 feet from the Ordinary High Water Mark (OHWM) of the Cedar River. The new lift station will replace the existing lift station 4-45. The existing lift station shall be in operation during the construction and until the new lift station if fully operational. Once the new station is fully operational the old lift station would be shut down. The project is located within the Urban Center North 2 zone. However, the Boeing Company entered into a development agreement ("2002 agreement") on June 28, 2002, by Resolution No. 3568 which, among other things vested the subject site to 2002 Industrial Heavy (IH) zoning. The project is located in Reach A of the Cedar River, Shoreline High Intensity overlay. The subject site would be considered a non -conforming site pursuant to the Shoreline Master Program, however the subject project would not result in an increase in impervious surface area or a change in building footprint. Therefore no site changes are required. Furthermore, the applicant has indicated that the project would not result in any changes to vegetation. LEGAL DESCRIPTION: POR OF E 1/2 OF SEC 7-23-05 LY ELY OF CWW #2 & NLY OF N 6TH ST IN SE 1/4 OF SEC LESS NP R/W LESS ST City of Renton Department of Comr & Economic Development Certificate of Exe on from Shoreline Substantial Development Replace Sewer Lift Station LUA12.091, SME DATE OF PERMIT: November 8, 2012 Page 2 of 3 TGW VAC LOGAN ST LY NWLY OF LN 30 FT NWLY OF GOV MDR LN TGW 2ND CL SH LDS ADJ SUBJ TO TWO 20 FT R/W ESMTS & POR OF SE 1/4 OF SE 1/4 OF SEC BEG NXN S MGN OF N 6TH ST WITH W MGN LOGAN AVE TH SLY ALG SD ST 995.34 FT TH S 89-18-45 W TO ELY MGN CWW #2 TH N ALG SD MGN TO S MGN N 6TH ST TH E TO BEG LESS BEG NW COR THOF TH SELY ALG WLY LN 328.75 FT TH N 89-45-45 E 366.34 FT TH N 00- 14-15 W TO S MGN N 6TH ST TH W TO BEG LESS 137.70 FT THOF TGW PORS OF NW 1/4 SEC 08-23-05 & SE 1/4 SEC 06-23-05 & SW 1/4 SEC 05-23-05 LY NWLY OF NP R/W & SWLY OF LN BEG NXN WLY EXT OF N LN OF GL 1 WITH W MGN SD R/W TH W 763.39 FT TH N 43-06-56 W 680.06 FT M/L TO INNER HARBOR LN TH S 46-52-27 W ALG SD LN 607.89 FT TO TPOB TH S 43-06- 56 E 713.87 FT TH S 46-53-04 W 215 FT TH S 20-38-24 W TO NWLY MGN SD NP R/W SUBJ TO SD 20 FT ESMTS LESS BN OPER STRIP ADJ POR OF SELY LN IN SD SEC 08- 23-05 LESS ST RD #7 TGW VAC LOGAN ST LY NLY OF SPUR TRACKS TGW BILK C LK WASH SH LDS 3RD SUPPL LESS POR FOR RD PER DEED 20060817000676 LESS POR PER DEED 20061212000338 SEC-TWN-R: SEC 7 TWN 23N R 5E WATER BODY/WETLAND: Cedar River, Reach A An exemption from a Shoreline Management Substantial Development Permit is hereby granted on the proposed project in accordance with RMC 4-9-190C.3 Exemptions from Permit System and/or for the following reason(s): Maintenance and Repair: Normal maintenance or repair of existing structures or developments, including damage by accident, fire or elements: a. "Normal maintenance" includes those usual acts to prevent a decline, lapse, or cessation from a lawfully established condition. b. "Normal repair" means to restore a development to a state comparable to its original condition, including but not limited to its size, shape, configuration, location and external appearance, within a reasonable period after decay or partial destruction, except where repair causes substantial adverse effects to the shoreline resource or environment. City of Renton Department of Comr & Economic Development Certificate of Exe )n from Shoreline Substantial Development Replace Sewer Lift Station LUA12-091, SME DATE OF PERMIT: November 8, 2012 Page 3 of 3 c. Replacement of a structure or development may be authorized as repair where such replacement is the common method of repair for the type of structure or development and the replacement structure or development is comparable to the original structure or development including, but not limited to, its size, shape, configuration, location and external appearance and the replacement does not cause substantial adverse effects to shoreline resources or environment The proposed development is consistent or inconsistent with (check one): CONSISTENT INCONSISTENT Policies of the Shoreline Management Act. N/A The guidelines of the Department of Ecology where no Master Program has been finally approved or adapted by the Department. X DATE OF DECISION ON LAND USE ACTION: SIGNATURE: k The City of Renton Shoreline Master Program. C.E. "Chip" Vincent, Administrator " Department of Community & Economic Development Attachments: Vicinity/Neighborhood Detail Map Site Plan cc: Owner Applicant/Contact City of Renton Official File I If / 2a Z Dat '"ity O ������ F} l��il7ff� Washington - Renton J. vision North 8th and Logan Avenue North, Renton, WA 98055 OCT 2 2 291; 51 52 53 54 to From ~os From , ; r S {� [1 o V Seattle 7 �m Bellevue �21 z 0 LAKE WASHINGTON ~ �4/+. i A FRQ�F H EX57 A 1: 4'04496 Medical ;� `" Guard Clinic Shack North y Boeing Bridge��QQ � °' `_y n�r' 4-95 "4 From rS.At _ iA. Shed Issaquah B l- -gp77u a.a'j� Cyd NBin � r t6 419 0 N 9TH 5T B c 5 P ry �kA7��17 489 10.60 z 0 C- � J 486 Huh of". ❑ L.Fd Z p 04-M n 15 Y ❑ 14 m n ti �713A 12 z w Renton, .f S27tli 8 N6TH 57 i['i'j 10-16 y Airport ` Apron 10131 I EXIT Boein 1 t O iT N 5TH 51 U 4 South 5403 Bridge penton f: y s g Stadiu Z Z F N 4TH ST ys 150 z _ 9firyr n < Z N ST �y 5-08 O c a qs _ From $ z z o k Seattle ys LL .SIRP6R7WAY -'} ¢ 6 EXITa 48 z Ste? F E%IT .. 4A F 52NDST �� �� p ° 169 ty w 5 3RD ST y r 9041 SUNSET 54TH 5T F q �5 CFOAq RIVEFrom Enumclaw T Rivertech 167 z wm x Corporate Center z r y SW 7TH ST 000- 3 7-207 q9� E J Briton Tower Three 7 a Triton Tower Two s EXIT 2B GM�Y ANY S� i Employee gates From AMS Turnstile gates I -S Laos 5W 16TH ST Fence lines From 0 Boeing property F LongacresQ 167 General parking Park SW 19TH 57 4 0 Restricted parking From o 515 90 Bus Stop w o and Helistop A Kent r 51 52 53 S4 35 Revised 07-10 Copyright 2012 0 The Boeing Company. All rights reserved. ®J/V/308 _-aF" OjV NOIIVIS ONIMVdO IIN63d dNrd EMS V .11d3X3 3NR 3dOHSP—t, Illl.lil�'.11l -00 City of Renton LAND USE PERMIT -7 - "00 oivisiQ TI OCT 2 2 2012 MASTER APPLICATIONii c PROPERTY OWNER(S) NAME: Boeing Corp. ADDRESS: 737 Logan Ave n. CITY: Renton ZIP: 98055 TELEPHONE NUMBER: (206 617-2944) APPLICANT (if other than owner) NAME: Mark Clement COMPANY (if applicable): Boeing ADDRESS: 737 Logan Ave n. CITY: Renton ZIP: 98055 TELEPHONE NUMBER 206 617-2944 CONTACT PERSON NAME: Mark Clement COMPANY (if applicable): Boeing Co. ADDRESS: 737 Logan Ave n. CITY: Renton ZIP: 98055 TELEPHONE NUMBER AND E-MAIL ADDRESS: 206 617- 2944 Mark.d.clement@boei'ng.com PROJECT INFORMATION PROJECT OR DEVELOPMENT NAME Replace sanitary sewer lift station PROJECT/ADDRESS(S)/LOCATION AND ZIP 737 Logan Ave n Renton WA 98055: KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S): 0723059001 EXISTING LAND USE(S): Manufactoring PROPOSED LAND USE(S): Manufactoring EXISTING COMPREHENSIVE PLAN MAP DESIGNATION: UCN PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION (if applicable): NA EXISTING ZONING Urban Center north 2 PROPOSED ZONING (if applicable): same as existing SITE AREA (in square feet): 6,618,761 sq. ft SQUARE FOOTAGE OF PUBLIC ROADWAYS TO BE DEDICATED:none SQUARE FOOTAGE OF PRIVATE ACCESS EASEMENTS: PROPOSED RESIDENTIAL DENSITY IN UNITS PER NET ACRE (if applicable): NA Q;web/pw/dev%ery/formslplanning/masterapp.doc 1 10/22/12 PR CT INFORMATION contin NUMBER OF PROPOSED LOTS (if applicable): NA PROJECT VALUE: 21 million NUMBER OF NEW DWELLING UNITS (if applicable): NA NUMBER OF EXISTING DWELLING UNITS (if applicable): SQUARE FOOTAGE OF PROPOSED RESIDENTIAL BUILDINGS (if applicable): NA SQUARE FOOTAGE OF EXISTING RESIDENTIAL BUILDINGS TO REMAIN (if applicable): NA SQUARE FOOTAGE OF PROPOSED NON-RESIDENTIAL BUILDINGS (if applicable): 90,000 SQUARE FOOTAGE OF EXISTING NON-RESIDENTIAL BUILDINGS TO REMAIN (if applicable): 155,7686 NET FLOOR AREA OF NON-RESIDENTIAL BUILDINGS (if applicable): NA NUMBER OF EMPLOYEES TO BE EMPLOYED BY THE NEW PROJECT (if applicable): na. IS THE SITE LOCATED IN ANY TYPE OF ENVIRONMENTALLY CRITICAL AREA, PLEASE INCLUDE SQUARE FOOTAGE (if applicable): ❑ AQUIFER PROTECTION AREA ONE J AQUIFER PROTECTION AREA TWO J FLOOD HAZARD AREA sq. ft. GEOLOGIC HAZARD 6,618,761 sq. ft sq. ft. J HABITAT CONSERVATION sq. ft. SHORELINE STREAMS AND LAKES 5,600 LF. ft. ❑ WETLANDS sq. ft. I LEGAL DESCRIPTION OF PROPERTY (Attach legal description on separate sheet with the followinsa information included) I SITUATE IN THE _ne QUARTER OF SECTION 7_, TOWNSHIP _23n_, RANGE -5e_, IN THE CITY OF RENTON, KING COUNTY, WASHINGTON. TYPE OF APPLICATION & FEES List all land use applications being applied for: 1. _X—Shoreline exemption 2. 9 Staff will calculate applicable fees and postage: $ Billed I AFFIDAVIT OF OWNERSHIP I I,Namels Print ( ) l ,declare that I am (please check one) _the current owner of the property involved in this application or the authorized representative to act for a corporation (please attach proof of authorization) and that the foregoing statements and answers herei/conta' ed and the information herewith are in all respects true and correct to the best of my knowledge and belief. I certify that I know or have satisfactory evidence that /i (ICLII1E-o— / / signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses and purposes mentioned fn the instrument. (Signature of Owner/Representative) Notary Public in and for the State of Washington Q: weblpw/devsery/forms/planning/masterapp.doc 2 16/22/12 (Signature of Owner/Representative) `,�av,�a�pt�r►r �/ N 11SUP z o- Farr a 'D -, -,- W. , �r�huntvMa''OP WASO' :OJECT INFORMATION (contin Notary (Print) j,� c My appointment expires: ( -1 t Q weblpwldevseryfformslplanninghnasterapp.doc 3 10122A2 PLANNING DIVISION WAIVE OF SUBMITTAL REQUI MENTS FOR LAND USE APPLICATIONSIli VI�101 This requirement may be waived by: n I _ Property Services PROJECT NAME: , �%in� 2. Public Works Plan Review 3. Building DATE: �� f 4. Planning - - H:10EDlDatalForms-Templates\Self-Help HandoutaNPlanninglwaiverofsubmittalregs.xis 06109 PLANNING DIVISION WAIVEIN JF SUBMITTAL REQUIK.AENTS Of Relito, FOR LAND USE APPLICATIONS This requirement may be waived by: 1. Property Services 2. Public Works Plan Review 3. Building 4. Planning PROJECT NAME: 429j4dro- Sam� &YwLyahp) F DATE: 10 ? 1 1 J12- H:10EDNDatakForms-TempialesZelf-Help Handc)uts%Planningkwaiverafsubmitt2lreqs.xls 06109 Q!J R.E!4.E.NTS-� Plat Name Reservation 4 n ID Y. ............ Public Works Approval Lettere ..... ...... .. .... . . Screening Detail 4 .............. z . .. ..... .... Stream or Lake Study, Standard 4 /U uppl-0 Stream or Lake Mitigation Plan 4 Title Report or Plat Certificate 4 -bra Traffic Study 2 MAW Urban Design Regulations Analysis 4 Wetlands Mitigation Plan, Final 4 1N aidsf4iEi Aik a Wetlands Report/Delineation 4 -W Applicant Agreement Statement 2 AND 3 Inventory of Existing Sites 2 AND 3 Lease Agreement, Draft 2 AND 3 Map of Existing Site Conditions.2 AND 3 Map of View Area 2 AND 3 Photos im ulatio ns 2 AND 3 This requirement may be waived by: 1. Property Services 2. Public Works Plan Review 3. Building 4. Planning PROJECT NAME: 429j4dro- Sam� &YwLyahp) F DATE: 10 ? 1 1 J12- H:10EDNDatakForms-TempialesZelf-Help Handc)uts%Planningkwaiverafsubmitt2lreqs.xls 06109 Project narrative BOEING COMMERCIAL AIRPLANE GROUP RENTON WASHINGTON Replace sanitary sewer lift station with new lift station 737 Logan avenue north Renton WA 98055 Main Boeing Renton manufacturing plant The lot size is 6618761 sq ft Shoreline Exemption Zoning designation is Urban Center north 2 No Special site features Sandy silt loam is the soil type. Drainage to Lake Washington from storm water system to multiple outfalls to Lake Washington The project is in the 200ft Shoreline zone. Excavation is less than 500 cubic yards No new increase in impervious service. No change to any vegetation. Project Description Boeing proposes a new sanitary sewer lift station including the vault, duplex pumps, pump controls, force main, and gravity main. The new lift station shall replace the existing lift station 4-45 and installed at a new location. It will provide new 4" sanitary piping to connect the new lift station to the existing sanitary force main at the inlet of the main meter vault. The existing lift station shall be in operation during the construction. The trench will be 155 linear feet. The new sanitary lift station shall be installed and fully operational before shutting down the existing lift station to complete the work inside the existing vault. The existing vault shall be cleaned, new 8" diameter sewer connection piping installed inside the vault and the vault shall be in -filled with gravel, and paved to match existing The connection of the new 4" diameter sewer piping to the existing piping at the sanitary force main meter vault Shall be completed during the same shutdown as mention above. Contractor will notify proper utilities before starting work and provide temporary erosion control measures