UTILITIES COMMITTEE
COMMITTEE REPORT
November 16, 2020
Request for Release of Utility Easement from Renton School Districgt related to the Sartori
School Property Project
(Referred November 9, 2020)
As part of the Sartori School Project, the original easement location will need to be released
to allow for the utilities to be relocated for the overall development of the property. An
easement with the City of Renton (recording #20080707000225 and 20081028000318) was
granted to the City at no cost, for the operation and maintenance of the utilities within the
subject property.
The developer has already provided new utility easements for the site utilities and the
existing easement is no longer needed.
All new public and private utilities are located within the current site and there is no future
need for the use of the portion of the easement being requested for release. No public funds
were spent on the acquisition or maintenance of this portion of the easement, therefore it is
classified as a “Class B” release of easement as defined in City Code 9-1-4 and requires no
further compensation to the City, other than the processing fee to be paid by the applicant.
Valerie O’Halloran, Chair
Angie Benedetti, Vice-Chair
Ryan McIrvin, Member