Loading...
HomeMy WebLinkAboutMFP24003058.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP24003058 IVR Number: 24003058 Permit Information Permit Name: Comcast Cable Franchise Permit Address/Location:06/14/2024Application Date:3664500185Parcel Number: 13014 156TH AVE SE, LOT Permit Type:08/01/2024Issue Date:Franchise Permit Work Class:08/01/2025Expiration Date:Minor Utility Job Number: JB0001857260Franchise Type:Cable Description: 13014 156TH AVE SE LOT Comcast JB0001857260. DELASH/RELASH 297' OF AERIAL CABLE. Contacts Name Address PhoneTypeBilling Danielle Hughes Prince Telecom LLC 13701 24th St E Bldg G Sumner, WA 98390 ApplicantX Joshua Ashley Comcast 410 Valley Ave NW, Suite 12 Bldg C Puyallup, WA 98371 B: (503) 939-7931Contact Akisha Brown Prince Telecom Inc 551A Mews Dr New Castle, DE 19720 B: (302) 482-8893 C: (302) 482-8892 Contractor Business License Number: 29850Electrical Contractor: PRINCTL834BF Construction Contractor: PRINCTL862PS Joshua Ashley Comcast 410 Valley Ave NW, Suite 12 Bldg C Puyallup, WA 98371 B: (503) 939-7931Emergency Contact VARMA KUSHAL S+RAM KAJAL A 2609 NE 5TH CT RENTON , WA 98056 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐ Electronic Copy of the TCP Application ☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:  Include map(s) showing the location of the project and work area.  Be legible lettering and clear, contrasting, symbols of viewing or printing.  Must indicate street names, and north arrow and scale.  Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Construction Company: PRINCE TELECOM LLC Project Name: JB0001857260 Permit #: Site Address: 13014 156TH AVE SE RENTON WA 98059 Work Date: From MONDAY To FRIDAY Work Time: Start 8:00 AM End 3:00 PM Contact Name: Business Address: 13701 24TH ST E BLDG G City/State: SUMNER, WA Zip: 98390 Description of Work: OCCUPY ROW FOR AERIAL WORK ONLY. NO GROUND DISTURBANCE. _____ Approval By: Date: Transportation Engineering Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 3 | Published: 10/27/2021 BILL WALKER Phone/Cell: 253-208-8108 MFP24003058 Scott Warlick CED PERMIT HOLDER AGREES TO ALL THE FOLLOWING:  Must have approved Traffic Control Plan (TCP) prior to commencing the work.  Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians.  WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way.  Comply with all traffic regulations of the City of Renton and the State of Washington.  Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices.  Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.  Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work.  Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions.  Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.  Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees.  The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.  In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same.  Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel.  All permit conditions shall be met. NOTES:  Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.  Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT.  Approved Temporary Traffic Control Plan must be at the work site during work hours.  Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone.  Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours.  Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021  In the case of Temporary No Parking Zones, all the following apply in addition to previous:  Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage.  Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time.  The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site.  Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 Danielle Hughes Danielle Hughes 07/19/2024 ROADWORKAHEADW20-1W20-7aW20-4100'ABC100'100'ONE LANEROADAHEADcones -flagger -13014 X ROADWORKAHEADW20-1 W20-7aW20-4 1 00'A B C100'100 'ONE LANEROADAHEADpoleexisting XEquipmentVehicleStaging X 156th Ave SeXSe 132nd StDriveway Driveway Driveway Driveway13128 13111 Prince telecomtelecommunicationsinstallationDanielle Hughes509-798-1762JOB # JB0001857260 NORTHNOT TO SCALE - Flagger will help Vehicles at Driveways, Guide Pedestrians and Bicycles's pass the work area - Minimum 10' Lanes NOTES :TYPICAL PROTECTIVE VEHICLE TYPE WITH TMA TYPICAL PROTECTIVE VEHICLE (WITH TMA) LOADED WEIGHT (LBS)STATIONARYOPERATION (ft)30 MIN.100 max. MINUMIM WEIGHT 16000 LBS(MAXIMUM WEIGHT SHALL BE IN ACCORDANCE WITH MANUFACTURER RECOMMENDATION4 YARD DUMP TRUCK SERVICE TRUCK FLAT BED, ETC PROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCELONGITUDINAL BUFFER SPACE = B ROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENTA PROTECTIVE VEHICLE IS RECOMMENDED REGARDLESS IF A TMA IS AVAILABLE IF NO TMA IS USED,THE PROTECTIVE VEHICLE SHALL BE STRATEGICALLY LOCATED IN THE FIELD TO SHIELD WORKERS ANDNO ROLL AHEAD DISTANCE IS SPECIFIED. REFER TO CHAPTER 1.5.5 FOR ADDITIONAL INFORMATION CHANNELIZING DEVICE SPACING CHART (FEET)50/7035/4520/30mph *Half-Spacing*TAPER TANGENT20N/A 403020 806040N/A BUFFER DATALONGITUDINAL BUFFER SPACE = BSPEED (mph)LENGTH (ft)25 30 35 40 45 50 55 60 65 70155200250305360425495570645730 MINIMUM TAPER LENGTH = L (feet)POSTED SPEED (mph)25 30 35 40 45 50 55 60 65 70 LANEWIDTH (feet)101112 105115125 150165180 205225245 270295320 450495540 500550600 550605660 660720-----780 840 SIGN SPACING = X (FEET) (1)FREEWAYS & EXPRESSWAYSRURAL HIGHWAYSRURAL ROADSRURAL ROADS and URBAN ARTERIALSRURAL ROAD, URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED 55/70 mph 60/65 mph45/55 mph35/40 mph25/30 mph25mph or less 1500ft +/-800ft +/-500ft +/-350ft +/-200ft +/- (2)100ft +/- (2)(1) All spacing may be adjusted to accomodate interchange ramps, at-gradeintersections, and driveways.(2) This spacing may be reduced in urban areas to fit roadway conditions. MERGING, SHIFTING, and SHOULDER TAPER LENGTHSand NUMBER OF CHANNELIZATION DEVICES USED10ft LANE 11ft LANE 12ft LANELLL1/2L 1/2L 1/2L Lane widthMPH Merging Merging MergingDevicesShiftingDevicesDevicesDevicesDevices DevicesShiftingShifting SHOULDER TAPERS(assume 10ft shoulders)1/3L Devices (FT)LengthMPH2025303540455055606570 70105150205270450500550600650700 668810161415161719 355575105135225250275300325350 345569889910 75115165225295495550605660715770 679911181516181920 406085115150250285305330370385 3455698991011 80125180245320540600660720780840 6710912191618192122 406590125160270300330360390420 345561099101112 2025303540455055606570 2535507090150170185200220235 33344666677 Shoulder tapers equalsshoulder Width x Speed/3Taper Length Criteria forType of TaperMerging TaperShifting TaperShoulder TaperOne-Lane, Two-Way Traffic TaperDownstream Taper at least Lat least 0.5 L50 Feet Minimum, 100 Feet maximumTemporary Traffic Control Zones Taper Lengthat least 0.33 L50 Feet Minimum, 100 Feet maximum KENNY'S TRAFFIC ZONE PLANSTRAFFIC CONTROL PLAN PREPARATIONPH # 425-223-7689TRAFICPLAYR@AOL.COMLongview, Wa STOPKENNY STERTZTRAFFIC CONTROL SUPERVISORWashington Oregon((ID# WA016416 SJ833B D.O.E 03/29/2026 5/31/2024ROADWORKAHEADW20-1W20-7bABBEPREPAREDTO STOP100'100'W20-7aC100'aerial cable/ Relash297'Delash www.invarion.comMFP24003058 PRINCE TELECOM LLC Construction Manager Scott Barker 509-342-5832 Engineer Bill Walker 253-208-8108 13701 24TH ST E BLD G Permit Coordinator Danielle Hughes 509-798-1762 Job Owner Ian Hulsey SUMNER WA 98390 Comcast Permit Contact Josh Ashley Job Type SDU - HFC POWER GAS WATER STORM • • • • • • • RENTON WA 98059 ROW SITE PLAN CONTRACTOR INFORMATION PERMIT INFORMATION JOB ADDRESS 13014 156TH AVE SE PROJECT ID: JB0001857260 LEGEND PED/VAULT TIE IN POLE NEW UG NEW AERIAL EXISTING UG EXISTING AERIAL 0 WORK AREA JOB ADDRESS COMMUNICATION SEWER SOFT SURFACE POTHOLE PROJECT DESCRIPTION OCCUPY/ PARK IN ROW TO ACCESS AERIAL CABLE 0 0 TOTAL UG 0 TOTAL AERIAL 297 GENERAL NOTE: •ALL SUBSTRUCTURE TO HAVE 36" COVER. •RESTORATION SHALL COMPLY TO JURISDICTION STANDARD. •CONTRACTOR TO COMPLY WITH ALL PROVISIONS OF LAW AND ORDINANCES GOVERNING THIS WORK AND WITH ALL STATE AND LOCAL LAWS AND ORDINANCES. UTILITY DISCLAIMER ALL LOCATIONS OF UTILITIES SHOWN AREAPPROXIMATE. LOCATION OF ALL UTILITIESTO BE VERIFIED PRIOR TO CONSTRUCTION.CALL UTILITY UNDERGROUND LOCATION CENTER AT 1-800-424-5555 PROPOSED PATH DISCALIMERS 1. PROPOSED PATH MAY CHANGE AT TIME OF CONSTRUCTION DUE TO UTILITY LOCATIONS AND INSPECTOR REQUIREMENTS2. UNKNOWN UTILITY DEPTHS TO BE VERIFIED IN 297' DELASH/RELASH ALL AERIAL OCCUPY/PARK IN ROW TO ACCESS AERIAL CABLE 156TH AVE SE MFP24003058 PRINCE TELECOM LLC Construction Manager Scott Barker 509-342-5832 Engineer Bill Walker 253-208-8108 13701 24TH ST E BLD G Permit Coordinator Danielle Hughes 509-798-1762 Job Owner Ian Hulsey SUMNER WA 98390 Comcast Permit Contact Josh Ashley Job Type SDU - HFC POWER GAS WATER STORM • • • • • • • TOTAL AERIAL 297 TOTAL UG 0 PROJECT ID: PROJECT DESCRIPTION OCCUPY/ PARK IN ROW TO ACCESS AERIAL CABLE 0 0 JB0001857260 LEGEND PED/VAULT TIE IN POLE NEW UG NEW AERIAL EXISTING UG EXISTING AERIAL WORK AREA JOB ADDRESS COMMUNICATION SEWER SOFT SURFACE POTHOLE 0 RENTON WA 98059 STREET VIEW CONTRACTOR INFORMATION PERMIT INFORMATION JOB ADDRESS 13014 156TH AVE SE GENERAL NOTE: •ALL SUBSTRUCTURE TO HAVE 36" COVER. •RESTORATION SHALL COMPLY TO JURISDICTION STANDARD. •CONTRACTOR TO COMPLY WITH ALL PROVISIONS OF LAW AND ORDINANCES GOVERNING THIS WORK AND WITH ALL STATE AND LOCAL LAWS AND ORDINANCES. UTILITY DISCLAIMER ALL LOCATIONS OF UTILITIES SHOWN AREAPPROXIMATE. LOCATION OF ALL UTILITIESTO BE VERIFIED PRIOR TO CONSTRUCTION.CALL UTILITY UNDERGROUND LOCATION CENTER AT 1-800-424-5555 PROPOSED PATH DISCALIMERS 1. PROPOSED PATH MAY CHANGE AT TIME OF CONSTRUCTION DUE TO UTILITY LOCATIONS AND INSPECTOR REQUIREMENTS2. UNKNOWN UTILITY DEPTHS TO BE VERIFIED IN OCCUPY/PARK IN ROW TO ACCESS AERIAL CABLE OCCUPY/PARK IN ROW TO ACCESS AERIAL CABLE MFP24003058 PRINCE TELECOM LLC 13701 24th St E Bldg G Sumner, WA 98390 07/19/2024 City of Renton 1055 South Grady Way Renton, WA 98057 RE: Aerial Variance Request for JB0001857260 To whom it may concern: Prince Telecom has been contracted to design and engineer this project on behalf of Comcast Cable Communications Management. Comcast is applying for a variance request in order to upgrade their existing facilities. Comcast proposes to OCCUPY ROW AT 13014 156TH AVE SE RENTON WA 98059 TO DELASH AND RELASH EXISTING COAXIAL CABLE ON THE W SIDE OF 156TH AVE SE. Comcast is requesting that the City of Renton approve this variance request based on the fact that the requirements for undergrounding this proposed over-lash on existing plant will cause undue hardship. 1. Installation of undergrounding facilities will increase the total cost of construction roughly 15-25 times the amount of an aerial over-lash on the existing Comcast strand. 2. Risk of potential damage to underground facilities will be increased. 3. Over-lash will not cause substantial adverse impact to other persons or entities in the immediate area. Over-lashing the cable will be accomplished in a few days, and the residents will not notice any impact. Comcast will clean up the over-lashed spans as necessary and identify and remove any existing dead cables along this route. 4. The variance is necessary to prevent any undue hardship due to the increased construction costs if forced to install the proposed extension underground. 5. The granting of the variance will not be materially detrimental to the public welfare. Comcast does agree to participate in future underground improvements for its proportionate share of the undergrounding costs, waiving the obligation into the future when all other utilities are undergrounded to prevent an undue hardship against Comcast currently. Upon the granting of the variance, Comcast will coordinate construction and traffic control as per your requirements. Comcast and their contractors want to cooperate at the highest level and agree to adhere to all provisions and requirements set forth by the City of Renton to insure safe installation and maintenance of the proposed facilities. If you have any further questions regarding this project, please contact Bill Walker 253‐208‐8108 Thank you for your consideration in this matter. Danielle Hughes Permit Coordinator Prince Telecom LLC 509‐798‐1762 | danielle.hughes@princetelecom.com August 1, 2024 Danielle Hughes Prince Telecom LLC 13701 24th St E Bldg G Sumner, WA 98390 Via Email: danielle.hughes@princetelecom.com SUBJECT: Request for Undergrounding Exemption (JB#1857260, MFP24003058, 13014 156th Ave SE) Dear Mr. Hughes: The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed underground, pursuant to the standards of the section of RMC. Comcast proposes to have Prince Telecom LLC overlash Coaxial Cable for a total of approximately 297 lineal feet to existing Puget Sound Energy (PSE) poles along 156th Ave SE within the City. See the enclosed Site Plan showing the proposed overlashing limits. ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5720 grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below, through and across the streets, avenues and alleys of City of Renton within the right-of-way of Renton. Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline service providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility service provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area are underground, Grantee shall place its Cable System’s distribution cables underground within that area; provided that such underground locations are actually capable of accommodating Grantee’s cable and other equipment without technical degradation of the Cable Systems’ signal quality. The proposal would utilize existing poles with other attached franchisee communication facilities and overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need to be provided for, any existing obsolete cable will need to be removed; staff recommends these as conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast franchise agreement which allows new overhead facilities to be placed overhead provided there are other similar providers overhead as well. Comcast is required to obtain all necessary private utility easements for work on private property. DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C) as requested by the applicant is approved with conditions subject to the conditions below as the request complies with the Comcast Franchise Agreement. Comcast Job JB#1857260 Page 2 of 2 August 1, 2024 Conditions of Approval: 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or designee, from the first event triggering the requirement to underground the aerial lines. This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk, along with the required appeal fee, by 5:00 pm, August 15, 2024. Appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday.  The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.   Sincerely, Brianne Bannwarth, PE Development Engineering Director cc: Justin Johnson, Construction Engineering Manager Nathan Janders, Development Engineering Manager Scott Warlick, Engineering Specialist III Holly Powers, Engineering Specialist III Franchise Permits Enclosures: Site Plan PRINCE TELECOM LLC Construction Manager Scott Barker 509-342-5832 Engineer Bill Walker 253-208-8108 13701 24TH ST E BLD G Permit Coordinator Danielle Hughes 509-798-1762 Job Owner Ian Hulsey SUMNER WA 98390 Comcast Permit Contact Josh Ashley Job Type SDU - HFC POWER GAS WATER STORM • • • • • • • RENTON WA 98059 ROW SITE PLAN CONTRACTOR INFORMATION PERMIT INFORMATION JOB ADDRESS 13014 156TH AVE SE PROJECT ID: JB0001857260 LEGEND PED/VAULT TIE IN POLE NEW UG NEW AERIAL EXISTING UG EXISTING AERIAL 0 WORK AREA JOB ADDRESS COMMUNICATION SEWER SOFT SURFACE POTHOLE PROJECT DESCRIPTION OCCUPY/ PARK IN ROW TO ACCESS AERIAL CABLE 0 0 TOTAL UG 0 TOTAL AERIAL 297 GENERAL NOTE: •ALL SUBSTRUCTURE TO HAVE 36" COVER. •RESTORATION SHALL COMPLY TO JURISDICTION STANDARD. •CONTRACTOR TO COMPLY WITH ALL PROVISIONS OF LAW AND ORDINANCES GOVERNING THIS WORK AND WITH ALL STATE AND LOCAL LAWS AND ORDINANCES. UTILITY DISCLAIMER ALL LOCATIONS OF UTILITIES SHOWN AREAPPROXIMATE. LOCATION OF ALL UTILITIESTO BE VERIFIED PRIOR TO CONSTRUCTION.CALL UTILITY UNDERGROUND LOCATION CENTER AT 1-800-424-5555 PROPOSED PATH DISCALIMERS 1. PROPOSED PATH MAY CHANGE AT TIME OF CONSTRUCTION DUE TO UTILITY LOCATIONS AND INSPECTOR REQUIREMENTS2. UNKNOWN UTILITY DEPTHS TO BE VERIFIED IN 297' DELASH/RELASH ALL AERIAL OCCUPY/PARK IN ROW TO ACCESS AERIAL CABLE 156TH AVE SE MFP24003058 PRINCE TELECOM LLC Construction Manager Scott Barker 509-342-5832 Engineer Bill Walker 253-208-8108 13701 24TH ST E BLD G Permit Coordinator Danielle Hughes 509-798-1762 Job Owner Ian Hulsey SUMNER WA 98390 Comcast Permit Contact Josh Ashley Job Type SDU - HFC POWER GAS WATER STORM • • • • • • • TOTAL AERIAL 297 TOTAL UG 0 PROJECT ID: PROJECT DESCRIPTION OCCUPY/ PARK IN ROW TO ACCESS AERIAL CABLE 0 0 JB0001857260 LEGEND PED/VAULT TIE IN POLE NEW UG NEW AERIAL EXISTING UG EXISTING AERIAL WORK AREA JOB ADDRESS COMMUNICATION SEWER SOFT SURFACE POTHOLE 0 RENTON WA 98059 STREET VIEW CONTRACTOR INFORMATION PERMIT INFORMATION JOB ADDRESS 13014 156TH AVE SE GENERAL NOTE: •ALL SUBSTRUCTURE TO HAVE 36" COVER. •RESTORATION SHALL COMPLY TO JURISDICTION STANDARD. •CONTRACTOR TO COMPLY WITH ALL PROVISIONS OF LAW AND ORDINANCES GOVERNING THIS WORK AND WITH ALL STATE AND LOCAL LAWS AND ORDINANCES. UTILITY DISCLAIMER ALL LOCATIONS OF UTILITIES SHOWN AREAPPROXIMATE. LOCATION OF ALL UTILITIESTO BE VERIFIED PRIOR TO CONSTRUCTION.CALL UTILITY UNDERGROUND LOCATION CENTER AT 1-800-424-5555 PROPOSED PATH DISCALIMERS 1. PROPOSED PATH MAY CHANGE AT TIME OF CONSTRUCTION DUE TO UTILITY LOCATIONS AND INSPECTOR REQUIREMENTS2. UNKNOWN UTILITY DEPTHS TO BE VERIFIED IN OCCUPY/PARK IN ROW TO ACCESS AERIAL CABLE OCCUPY/PARK IN ROW TO ACCESS AERIAL CABLE MFP24003058 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit MFP24003058 Engineering 1 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 2 A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 3 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15'-6". 4 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or designee, from the first event triggering the requirement to underground the aerial lines. Page 1 of 1