HomeMy WebLinkAboutMiscD.R. STRONG
CONSULTING ENGINEERS
Technical Information Report
(TIR)
for
Saddlebrook Div. II
13422 1561h Avenue SE, Renton, Washington
DRS Project No. 13030
City of Renton File No. LUA 13-XXX
Owner/Applicant
ACH Homes, LLC
9675 SE 36 1h Street, Suite 105
Mercer Island, Washington 98040
Report Prepared by
lbliiJ)
D. R. STRONG Consulting Engineers, Inc.
10604 N.E. 38th Place, Suite 232
Kirkland WA 98033
(425) 827-3063
© 2013 D. R. STRONG Consulting Engineers Inc.
Report Issue Date
May 20, 2013
MAY ? ~ 1013
TECHNICAL INFORMATION REPORT
Saddlebrook
TABLE OF CONTENTS
SECTION 1 ••••••••••••••••.•.••••••••••••••••••••••••••••••••••••••••••••••••.••••••••••••••••••••••••••••.••••••••••••••••••••••••••••••••••••••••••••••••••• 1
PROJECT OVERVIEW:........................................... .. ................................ 1
PREDEVELOPED SITE CONDITIONS:.................................................. .. ................................ 1
DEVELOPED SITE CONDITIONS:............................................ ... .. ................................. 1
NATURAL DRAINAGE SYSTEM FUNCTIONS:.................................................... ... ......... . ..... 2
FIGURE 1. TIR WORKSHEET.......................................................... . ..... 3
FIGURE 2. VICINITY MAP............................ . ... ......... ... . .................. ............. ...... ........... .. ...... 6
FIGURE 3. DRAINAGE BASINS, SUBBASINS, AND SITE CHARACTERISTICS ............................ 7
FIGURE 4. SOILS ............................................................................................................................... 8
SECTION 11 ................................................................................................................................................. 10
CONDITIONS AND REQUIREMENTS SUMMARY.......................... . ................. 10
SECTION 111 ................................................................................................................................................ 12
OFF-SITE ANALYSIS ............................................................................................................................. 12
SECTION IV ............................................................................................................................................... 13
FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN ........................ 13
EXISTING SITE HYDROLOGY (PARTA)..... . ................. 13
FIGURE 5. PREDEVELOPMENT AREA MAP...... . ........ 14
DEVELOPED SITE HYDROLOGY (PART B). .......... ...................... ...... .. ....... 15
BYPASS AREA HYDROLOGY............................. . ............ 17
FIGURE 6. POST DEVELOPMENT AREA MAP.............. .. ....................................... 18
PERFORMANCE STANDARDS (PART C) ............................................................................................ 19
FLOW CONTROL SYSTEM (PART D) ....................... .... .. ............................................. 19
FLOW CONTROL BMP SELECTION ................................................................................................... 19
FLOW CONTROL SYSTEM ................................................................................................................... 20
WATER QUALITY TREATMENT (PART E) ..................................................................................... 28
FIGURE 7. DETENTION FACILITY DETAILS AND BAYFILTER SIZING ........................................ 29
SECTION V ................................................................................................................................................ 30
CONVEYANCE SYSTEM ANALYSIS AND DESIGN ............................ .. .. .............. 30
DEVELOPED 15-MINUTE TIME SERIES ........................ . . .............. 30
BACKWATER ANALYSIS .......................................... .
BACKWATER ANALYSIS MAP ........................................................................................... ..
. .. 32
. .. 34
BACKWATER ANALYSIS RESULTS ......................... . . .......... 35
SECTION VI ............................................................................................................................................... 39
SPECIAL REPORTS AND STUDIES ............. . . ................................... 39
SECTION VII .............................................................................................................................................. 40
OTHER PERMITS, VARIANCES AND ADJUSTMENTS ....................................... 40
SECTION VIII ............................................................................................................................................. 41
ESC PLAN ANALYSIS AND DESIGN (PART A)....... . ........ 41
SWPPS PLAN DESIGN (PART B) ........................................................................................................ 41
SECTION IX ............................................................................................................................................... 43
BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT ................. 43
STORMWATER FACILITY SUMMARY SHEET .................. 44
SECTION X ................................................................................................................................................ 46
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
Saddlebrook Div. II
Renton, Washington
OPERATIONS AND MAINTENANCE MANUAL. ................................................... . ........ 46
APPENDICES ............................................................................................................................................. 47
APPENDIX "A" LEGAL DESCRIPTION ..
APPENDIX "B" BOND QUANTITY WORKSHEET ...................... .
APPENDIX "C" OPERATIONS AND MAINTENACE MANUAL .. .
APPENDIX "D" CSWPPP ..
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
. ................ 48
. .. 49
50
. ...... 51
Saddlebrook Div. 11
Renton, Washington
SECTION I
PROJECT OVERVIEW:
The Site is located at 13422 1561
h Avenue SE in Renton, Washington, also known as
King County Tax Parcel Number 366450-0250. The Project is the subdivision of this
existing parcel zoned R4 (0.89 ac. total) into three single-family residential lots, per the
City of Renton's (City) short plat process. The Site will utilize the detention facility within
Saddlebrook Div. I to meet flow control requirements. The pond will be redesigned to
Level Three Flow Control Standards. The Project will meet the drainage requirements
of the 2009 King County Surface Water Design Manual (Manual), as adopted by the
City.
PREDEVELOPED SITE CONDITIONS:
Total existing Site area is approximately 38,715 s.f. (0.89 ac). Total proposed Project
area is 41,095 s.f. (0.94 ac) which includes 2,380 s.f. (0.05 ac) for the right-of-way
frontage improvements on 1561h Avenue SE. The Parcel is currently developed with a
single-family home, covered patio and a gravel driveway. The remainder of the Site is
lawn, landscaping, and scattered trees.
The 0.89 acre parcel contains a single natural discharge point near the southwest
corner of the Site. The Site sheet flows towards the southwest corner of the Site and
into the right-of-way. From there, it is collected into the conveyance system within 1561
h
Avenue and is conveyed south.
For the purpose of hydrologic calculations, the entire Site is modeled as till forest.
DEVELOPED SITE CONDITIONS:
The applicant is seeking approval to subdivide 0.89 acres into three single-family
residential lots (Project), with lot sizes ranging from approximately 10,249 to 10,983 s.f.
All existing improvements will be demolished or removed during plat construction. The
proposed impervious surface area will include a new shared driveway tract with 16 feet
of pavement. Impervious surface are will also include offsite half-street improvements
along 1561h Avenue SE. The proposed shared driveway improvements total
approximately 4,474 s.f. The three single-family residences and their driveways
combined will create approximately 10,875 s.f. of impervious area (reduced from
maximum allowable, see next paragraph for details). Post-developed impervious areas
including driveways, roofs, and site frontage improvements total approximately 17,729
s.f. (includes Bypass area). The remainder of the Project will be modeled as till grass
totaling approximately 23,366 s.f. (See Section IV)
Per the 2009 King County Surface Water Design Manual (Manual), Appendix C, each
lot within a new subdivision is required to mitigate for impervious surface area equal to
10% of the lot area. Per Figure C.1.3.A, Flow Control BMP Flowchart, the Project will
utilize Basic Dispersion with the use of splash blocks. Two splash blocks mitigating a
total of 1,400 s.f. of impervious area, will be installed with each residence. This shall
mitigate for 12.75% to 13.66% of impervious area for each lot. Also, each lot will be
restricted to an area less than 4,000 s.f. (see table below). Additionally, use of Basic
© 2013 D. R STRONG Consulting Engineers Jnc.
Technical Information Report
Saddlebrook Div. II
Renton, Washington
Dispersion allows for a 50% flow control BMP sizing credit which was used in detention
facility calculations. See table below for lot area, restricted impervious area per lot, and
percent impervious mitigated per Jot.
ROOF AREA ROUTED TO RESTRICTED IMPERVIOUS TOTAL AREA PERCENT IMPERVIOUS
LOT NO. LOT AREA (S.F.) SPLASH BLOCK (S.F.) AREA PER LOT MITIGATED MITIGATED
1 10249 1400 3505 1895 18.49
2 10983 1400 3485 1915 17.44
3 10877 1400 3885 1515 13.93
All surface water runoff from impervious surfaces will be collected and conveyed to a
storm detention pond located within Tract "A of Saddlebrook Div. I. From there, runoff
will be conveyed through a BayFilter vault before entering the existing conveyance
system within 1561h Avenue SE.
NATURAL DRAINAGE SYSTEM FUNCTIONS:
A review of the SCS soils map for the area (see Figure 4, Soils) indicates Alderwood
gravelly sandy loam with 6 to 15 percent slopes (AgC). Per the Manual, this soil type is
classified as "Till" material. The SCS Soil series descriptions follow Figure 4.
In evaluating the upstream area, we reviewed the existing offsite analysis and King
County IMAP aerial topography and imagery and conducted field reconnaissance and
have concluded that upstream tributary area for the Site is negligible.
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
2 Saddlebrook Div. II
Renton, Washington
FIGURE 1. TIR WORKSHEET
King County Department of Development and Environmental Services
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER
Project Owner:
ACH Homes, LLC
Address/Phone:
9675 SE 36 1h Street, Suite 105
Mercer Island, Washington 98040
(206) 588-1147
Project Engineer:
Maher A. Joudi, P.E.
Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Name:
Saddlebrook Div. II
Location:
Township: 23 North
Range: 05 East
Section: 14
D. R. STRONG Consulting Engineers
Inc.
Address/Phone:
10604 NE 38 1
h Place, Suite 232
Kirkland WA 98033
(425) 827-3063
Part 3 TYPE OF PERMIT
APPLICATION
D Subdivision
~ Short Subdivision
~ Clearing and Grading
D Commercial
D Other:
Part 4 OTHER REVIEWS AND PERMITS
D DFWHPA D Shoreline
Management
0 COE404 D Rockery
D DOE Dam Safety D Structural Vault
0 FEMA Floodplain D Other:
D COE Wetlands
Part 5 SITE COMMUNITY AND DRAINAGE BASIN
Community:
Newcastle
Drainage Basin
Lower Cedar River
© 2013 D.R. STRONG Consulting Engineers lnc.
Technical Information Report
3 Saddlebrook Div. ll
Renton, Washington
Part 6 SITE CHARACTERISTICS
0River: D Floodplain
D Wetlands
D Stream: D Seeps/Springs
D Critical Stream Reach D High Groundwater Table
D Depressions/Swales D Groundwater Recharge
D Lake: D Other:
D Steep Slopes
Part 7 SOILS
Soil Type: Slopes: Erosion Potential: Erosive Velocities:
Alderwood 6-15% Moderate Slow to Medium
(AgC)
~ Additional Sheets Attached: SCS Map and Soil Description, Figure 4
Part 8 DEVELOPMENT LIMITATIONS
REFERENCE LIMITATION/SITE CONSTRAINT
~ Level 1 Downstream Analysis None _____________ _
~ Geotechnical Engineering Study
D Environmentally Sensitive Areas
D Level 2 Off-Site Stormwater Analysis
~ Level I Traffic Impact Analysis
D Structural Report
D Additional Sheets Attached
Part 9 ESC REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
~ Sedimentation Facilities
~ Stabilized Construction
Entrance
~ Perimeter Runoff Control
~ Clearing and Grading
Restrictions
~ Cover Practices
~ Construction Sequence
D Other
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
~ Stabilize Exposed Surface
~ Remove and Restore Temporary ESC
Facilities
~ Clean and Remove All Silt and Debris
~ Ensure Operation of Permanent Facilities
D Flag Limits of SAO and open space
preservation areas
D Other
4 Saddlebrook Div. II
Renton, Washington
Part 10 SURFACE WATER SYSTEM
D Grass Lined
Channel
[2J Pipe System
D Open Channel
[2J Dry Pond
D Wet Pond
D Tank
D Vault
D Energy Dissipater
D Wetland
D Stream
D Infiltration
D Depression
D Flow Dispersal
D Waiver
D Regional
Detention
Method of Analysis:
KCRTS
Compensation/
Mitigation of Eliminated
Site Storage
N/A
Brief Description of System Operation: Runoff from impervious surfaces will be collected
and conveyed to the detention pond in Tract A of Saddlebrook Div. I. From there it will
be discharged to the existing conveyance system within 1561h Avenue SE.
Facility Related Site Limitations:
Reference Facility
Part 11 STRUCTURAL ANALYSIS
D Cast in Place Vault
D Retaining Wall
D Rockery > 4' High
D Structural on Steep Slope
D Other:
Limitation
Part 12 EASEMENTS/TRACTS
[2J Drainage Easement
[2J Access Easement
D Native Growth Protection Easement
[2J Tracts
D Other:
Part 13 SIGNATURE OF PROFESSIONAL ENGINEER
I or a civil engineer under my supervision have visited the site. Actual site conditions
as observed were -~ncorporated into this worksheet and the attachments. To the best
of my knowledge rw information provided here is accurate.
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
5 Saddlebrook Div. II
Renton, Washington
i
! ' ' -~ ~<it'ICA
--~
r
• • l
• ' I
FIGURE 2. VICINITY MAP
' ' !
Renton
...
'"'""""
I •
' ! l
'
The information included on this map has been compiled by King County staff from a variety of sources and is subject to change
without notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness,
or rights to the use of such information. King County shall not be liable for any general, special, indirect, incidental, or consequential
damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on
this map. Any sale of this map or information on this map is prohibited except by written permission of King County.
© 2013 0. R. STRONG Consulting Engineers Inc.
Technical Information Report
6 Sadd!ebrook Div. JI
Renton, Washington
FIGURE 3. DRAINAGE BASINS, SUBBASINS, AND SITE CHARACTERISTICS
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
7 Saddlebrook Div. II
Renton, Washington
I
I
I
I
I
1~-~
I
L_
,~-
_____ ,f
0'· _('.. '-'---
' • ~ , ·l1--._._ l TD~ J/89 AC~
. lun---_ --J --
/,. ::s: ,, -. -
" re 2 I
' [ __ !
1 1
339 LF FROM FAflTHEST 3 ~ '. j I UPSTREAM END fQ
' ---) ';:: . -, I
-T>-____ ·1
'_, •_:_-1-_ t-_'---_ _· __ , -DE-T,_E ____ N_ TION POND,
, j ~-----~-._'_c_i ___ /_1 J_r,wit.'-x-:. _-=---_ =J I --.~ . -"° •-1= ---1 ----. :~:------=:----,-__ .-·~----'-c
~--:-·-~ ---------
--~-----~,_ .. ·>-1-n ·
1, I',/_ :,1
----
~~XIS-:;;;; AND CON;
0
TRUC;;N -
RUNOFF EXIT SITE HERE• -
---
I
----] •-.,
'
j I
·. '_-1· : \~
-.,,_
!I l , I
C
~~--------._--._Ji -~---__ -_---:,~~=-~ -c--·-~'----------. .,/1
=-/ ~ ---71----l i_'-;
LEGEND
SITE BOUNDARY
't\.. / 7
---~-""'=== r" ,---·v-
·I
[~~ --c_~~) ,_ J . J
DEVELOPED RUNOFF
.. Ef<I T SI TE HERE
•
I
~>I:,
/. •I -,
' -: I
!" ·1
(
0
@
NORTH
GRAPHIC SCALE
40 80
' ' --
1 INCH= 80 FT.
120
---BASIN BOUNDARY
R \2013 \0\13030\J\Drcwir1gs \PcsA\f<,,oort Figureq \01-.\_'-IG.31..1030 c;·~·q 5/3/2013 1;: 11: 23 AM PDT
CC,'YRl'.-HT@ 2012 , JR. s~ROC<JG CONS·JL TING E'JGtNEERS 1'1::::.
"' ili ~ (!)
~
~~ ~ i::: s " 0: ii <:i l;)
~ i'.::
.... !':!2
,q: 8j
• i ~ ~ ~ ~ o' ~
• ~ ij
~ i! ~ ffi ~ ~
! ! ~ • ij
ffi ~ ~ ~ ~ 0 ~ I
~ t; .... ~
Q:: ~ ~ ~~~ (/) !::: lJJ ~
Cl) ::::s (!)
:::: ~ ::c: ::c: ...... :C:~:i: ... '<c Cl)
;::;: Cl) '<c :;c .... ~~~ 5 i~~
0 ~ &l~ a:: Cl) ~ lJJ !:Q Cl) ,._ a::
IJ.i ~
..... Cl)
Q a§
Q lJJ ~ ~ ~
DRAFrED BY: 't7.P
DESIGNED BY: 't7.P
PROJECT ENGINEER: IJAJ
DA TE: (H,.JO.t.J
PRO£CT NO.: 1,JO.JO
ncuRE 3 I
FIGURE 4. SOILS
King County Area, Washington
AgC-Alderwood gravelly sandy loam, 6 to 15 percent slopes
Map Unit Setting
Elevation: 50 to 800 feet
Mean annual precipitation: 25 to 60 inches
Mean annual air temperature: 48 to 52 degrees F
Frost-free period: 180 to 220 days
Map Unit Composition
Aldeiwood and similar soils: 95 percent
Minor components: 5 percent
Description of Alderwood
Setting
Landfonn: Moraines, till plains
Parent material: Basal till with some volcanic ash
Properties and qualities
Slope: 6 to 15 percent
Depth to restrictive feature: 24 to 40 inches to dense material
Drainage class: Moderately well drained
Capacity of the most limiting fayer to transmit water (Ksat): Very low
to moderately low (0.00 to 0.06 in/hr)
Depth to water table: About 18 to 37 inches
Frequency of flooding: None
Frequency of ponding: None
Available water capacity: Very low (about 2,5 inches)
Interpretive groups
Land capability (nonirrigated): 4s
Typical profile
0 to 12 inches: Gravelly sandy loam
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
8
SITE
Sadd!ebrook Div. II
Renton, Washington
12 to 27 inches: Very gravelly sandy loam
27 to 60 inches: Very gravelly sandy loam
Minor Components
Norma
Percent of map unit: 1 percent
Landform: Depressions
Bellingham
Percent of map unit: 1 percent
Landform: Depressions
Seattle
Percent of map unit: 1 percent
Landform: Depressions
Tukwila
Percent of map unit: 1 percent
Landform: Depressions
Shalcar
Percent of map unit: 1 percent
Landform: Depressions
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
9 Saddlebrook Div. II
Renton, Washington
SECTION II
CONDITIONS AND REQUIREMENTS SUMMARY
The Project must comply with the following Core and Special Requirements:
• C.R. #1 -Discharge at the Natural Location: The Site will discharge at its natural
discharge location.
• C.R. #2 -Offsite Analysis: An Offsite Analysis is included in Section Ill. The
Analysis describes the Site's runoff patterns in detail.
• C.R. #3 -Flow Control: The Project is required to adhere to Level 3 Flow Control
Standards per Adjustment 2012-03 for Saddlebrook Div. I. A detention pond will
provide flow control as required for both drainage basins within Saddlebrook Div. I
as well as Saddlebrook Div. II. The Project is required to "match developed
discharge durations to predeveloped durations for the range of predeveloped
discharge rates from 50% of the two-year peak flow up to the full 50-year peak
flow." (KCSWDM, Sec. 1.2) Also match developed peak discharge rates to
predeveloped peak discharge rates for the 2, 10 and 100 year return periods.
Furthermore, the Project must meet the Flow Control BMP requirements as
specified in Section 1.2.3.3 of the Manual. The Project will utilize basic dispersion
and restricted footprint to meet this requirement.
• C.R. #4 -Conveyance System: New pipe systems and ditches/channels are
required to be designed with sufficient capacity to convey and contain (at minimum)
the 25-year peak flow, assuming developed conditions for onsite tributary areas and
existing conditions for any offsite tributary areas. Pipe system structures and
ditches/channels may overlap for runoff events that exceed the 25-year design
capacity, provided the overflow from a 100-year runoff event does not create or
aggravate a "severe flooding problem" or "severe erosion problem" as defined in
C.R. #2. Any overflow occurring onsite for runoff events up to and including the
100-year event must discharge at the natural location for the project site. In
residential subdivisions, such overflow must be contained within an onsite drainage
easement, tract, covenant or public right-of-way. The proposed conveyance system
was analyzed using the KCBW program, and is capable of conveying the 100-year
peak storm without overlapping any structures or channels (see Section V).
• C.R. #5 -Erosion and Sediment Control: The Project provides the nine minimum
ESC measures.
• C.R. #6 -Maintenance and Operations: Maintenance of the proposed storm
drainage facility will be the responsibility of the City. An Operation and Maintenance
Manual is included in Section X.
• C.R. #7 -Financial Guarantees: Prior to commencing construction, the Applicant
must post a drainage facilities restoration and site stabilization financial guarantee.
For any constructed or modified drainage facilities to be maintained and operated by
the City, the Applicant must: 1) Post a drainage defect and maintenance financial
guarantee for a period of two years, and 2) Maintain the drainage facilities during the
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
10 Saddlebrook Div. II
Renton, Washington
two-year period following posting of the drainage defect and maintenance financial
guarantee.
• C.R. #8 -The Project is located in the Basic Water Quality Treatment area.
Stormwater runoff will be collected in the detention pond and then conveyed through
a BayFilter vault which will accommodate water quality requirements.
• S.R. #1 -Other Adopted Area-Specific Requirements: Not applicable for this
Project.
• S.R. #2 -Floodplain/Floodway Delineation: Not applicable for this Project.
• S.R. #3 -Flood Protection Facilities: Not applicable for this Project.
• S. R. #4 -Source Control: Not applicable for this Project.
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
11 Saddlebrook Div. II
Renton, Washington
SECTION Ill
OFF-SITE ANALYSIS
A Level One Downstream Analysis was prepared by DR Strong Consulting Engineers.
A copy has been included in this Section.
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
12 Saddlebrook Div. II
Renton, Washington
LEVEL ONE DOWNSTREAM ANALYSIS
for
SADDLEBROOK DIV. II
Short Plat
13422 1561
" Avenue SE, Renton, Washington
DRS Project No. 13030
Renton File No. LUA 13-XXX
Owner/Applicant
ACH Homes, LLC
9675 SE 35th Street, Suite 105
Mercer Island, WA 98040
Report Prepared by
il!ki.11
D. R. STRONG Consulting Engineers, Inc.
10604 N.E. 38th Place, Suite 232
Kirkland WA 98033
(425) 827-3063
©2012 D.R. STRONG Consulting Engineers Inc.
Report Issue Date
May 14, 2013
LEVEL ONE DOWNSTREAM ANALYSIS
SADDLEBROOK DIV. 11
TABLE OF CONTENTS
TASK 1 DEFINE AND MAP THE STUDY AREA ......................................................... 1
TASK 2 RESOURCE REVIEW ..................................................................................... 5
TASK 3 FIELD INSPECTION ..................................................................................... 15
Upstream Tributary Area ............................................................................................ 15
General Onsite and Offsite Drainage Description ...................................................... 15
TASK 4 DRAINAGE SYSTEM DESCRIPTION AND PROBLEM DESCRIPTIONS ... 16
Drainage System Description ..................................................................................... 16
Downstream Path ................................................................................................... 16
TASK 5 MITIGATION OF EXISTING OR POTENTIAL PROBLEMS ......................... 21
List of Figures
Figure 1 Vicinity Map ....................................................................................................... 2
Figure 2 Site Map ............................................................................................................ 3
Figure 3 King County iMap Topography ......................................................................... .4
Figure 4 Streams and 100-Year Floodplains and Floodway ............................................ 6
Figure 5 King County iMap Wetlands .............................................................................. 7
Figure 6 King County iMap Erosion Hazard Areas .......................................................... 8
Figure 7 King County iMap Landslide Hazard Areas ....................................................... 9
Figure 8 King County iMap Seismic Hazard Areas ........................................................ 10
Figure 9 FEMA -Flood Insurance Rate Map ................................................................ 11
Figure 10 King County iMap Drainage Complaints ........................................................ 12
Figure 11 USDA King County Soils Survey Map ....................................................... 13
Figure 12 Downstream Map .......................................................................................... 18
Figure 13 Downstream Table ........................................................................................ 19
©2013 D.R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Div. II Short Plat
Page i ofi
City of Renton
TASK 1 DEFINE AND MAP THE STUDY AREA
This Offsite Analysis was prepared in accordance with Core Requirement #2, Section
1.2.2 of the 2009 King County Surface Water Design Manual (Manual). The Site is
located at 13422 1561h Avenue SE in Renton, Washington.
See Figure 1, Figure 2, and Figure 3 for maps of the study area.
©2013 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Sadd!ebrook Div. II Short Plat
Page 1
City of Renton
FIGURE 1
VICINITY MAP
SITE
• I
~ 0
R-4 Sli1l1Sis;r • i • R-4
R-4
SE ll!STL.h"
R-4 "-~
R-4 SE ID>tCPL
!
S£1ll>cOCT • •• • 1'. R-4 I NE!STPI.
• l,'\;1STIST a
;; SllilJCTifST
§ :1 i I ·'
NE1S'Tl>I. R-4 ,.,,rn
• f """"~ !
I • Renton • ""'~ R-4 .....
SE1JIITMS
• """~ <
I • • • ~ "'""' < • < SEl1'TIITI'II, ~ t I ~ """'~ \~ • • ~ < <
Sli~OPL SE:¥lOPl· I
81811
The information included on this map has been compiled by King County staff from a variety of sources and is subject to change
without notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness,
or rights to the use of such information. King County shall not be liable for any general, special, indirect, incidental, or consequential
damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on
this map. Any sa!e of this map or information on this map is prohibited except by written permission of King County.
©2013 D.R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Div. II Short Plat
Page 2
City of Renton
©2013 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis
FIGURE 2
SITE MAP
Saddlebrook Div. II Short Plat
Page 3
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I~ Li'
,t ct
: :2·
1_ -·
-
\ 1
\ 1 I,
, I 1
',' 1-, 'jl _/''
! I ...._1'_,,....
1 J1+L,J _\ , _ ,J.-J,, Jl'jl' --'<', -,-" ' '' -,, .. ,, -
1 (f i :/
\iii'':
11 ' i_ 'I'-
-'i ·::~ ,·''
_I I \ I" • 1<~,,{-c,;-·_c· __ -= -3, -· __ \ -•• \' II I -1:' :', ,s i \--------~;--~~,,·-' 1;, ;,-~, X------X~ ~' -' IL
, 1 '·,I , ,ci i'(u -~--· · '-\--: ",,>>-,_ -~ ---_ , •. I: 1 • I I,);'-';' :r \ I !"'---' '". -' ,---C ,-,/ ,''.' -' I • -' I' ,, • ' ' . , ,,-, ' -~ ., ,, , ----------------------~ I i t,,! \ i j ,; ---,,, ,,,,
:::, , : 1'' ' \ -, Go{ 'I ~i ): \ -,-h" ---f,~
t > : <
1
: ; ! 1 ___ ,---'i_-'7:',1 _ ,,--) ,~,.,--..._ C I
' , ::c --,---\ ,,----cl"£· /_
.______:>\ F ' :: '1'· '' < _C •' ,-;"\'{' C
-·>,, ! \~ I Hi%, . ' "' lii,I
I. I
1
'-~J ,f,Jj ,r! )i, ' \ \ ( ~--::-' •·
J
r l'-C--:, 1J:,:•,,-,-,; -\ c~ I ,:;··£i.·
"' " --, --~ l f "<, -_--_'°, _;;-.": r,'.':'"-'_''"', \ 'o'')_ ;:;._ ,,0.'--( :;c_ -'" -'1 ,----' '----:-=-~ r:c-::, 'r:J "" ,: ',;. I -I .. .-Iv , r "-" ' , ,,_,., ,'---'I
~L .-_ \'~t ,, ~-,_•' -,L .J -, · ._,; '' ,, .
1
1' ' -i I 'I -I '
I -' , 1·: 'j I 'I, I I ' -
-.-...... ::,
·1' '-------',J , , ,-',,1_ rl 1 =\--=1·~(~) I
L __ fr\'/ __ J I 11
I! 1, : [ I_
I I I
'I i'
),i '_ I r I
i~,
j\/il
I i ; , I
1:: I
1· !
1·: I
:·: ,i
I, f,!
G ·.,:
...------i-i.·: C
/ "\\ / i ' , __ , \ \'
)',,f\ .. (
(.' ,,.( ,i· l
\ -
;· ~
\
t c:~
(?/\)
' / '-.. ... ,
r{I
\.,_~·(
.. -f. \_
·< 13 .,_ C
'.C'._ ..• v ______
cc.
@
NORTH
GRAPHIC SCALE
0 20 40 60
1 INCH= 40 FT.
II
.,
ffi "' ~ "' iii
"'"' ii ~ e: :5 ., .,
{t ~
c:i '-'
....
~ .... a:: ~
I i
~ ~ -~ . "; ~ , ~
" " " -~ ffi :ii:: Ii.. ! t ij
" i;i " I ~ I ~ ~ -.
ffi !
~ Cl)
:::: ~
:::::.: Cl. -.J -~~ Q !IJ '( ~ ~ I!:! 0 CJ) ii>
0 lt a:: Q
fB
~
Q
~
DRAFTED BY: Ill'
DESIGNED BY: U
PROJECT ENGINEER: ltlAI
DATc:: Of.&0
PROJECT NO.: ,...
R:\'OU\0\UOJO\J\O,ow!ogs\Bose\Ropoc> F;g,<es\OHDS_FIG2_cwg 5/3/20'3 2 39 30 PM PDT [ ~GURE, 2 I
COPYRIGHT @ 2012, !).R._ ST'3._0N_Q_ C~SULTING ENGINEERS INC
FIGURE 3
KING COUNTY IMAP TOPOGRAPHY
Ill Highlighted Feature -. County Bounda ,y
·-X Mountain Peaks
Contours (5ft dark)
/V 100:500;1000
;V Othm
©2013 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis
V
Renton
Legend
Highways D
Streets I'/
HighW3)'
Artcriilts
La.cal
Parcels
Saddlebrook Div. II Short Plat
Lakes and Large Rivers
Streams
Page 4
City of Renton
TASK2 RESOURCE REVIEW
• Adopted Basin Plans: May Creek Basin Action Plan was adopted in April 2001.
• FloodplainlFloodway (FEMA) Map: No floodplains exist on site, See Figure 9.
• Other Offsite Analysis Reports: Saddlebrook Div. I
• Sensitive Areas Folio Maps: See Figures 4-8 for documentation of the distance
downstream from the proposed project to the nearest critical areas. Included, are
sections of the King County Sensitive Areas Folio which indicate the following:
• Figure 4 Streams and 100-Year Floodplains and Floodway: There is a
Class 2 Stream within one mile of the Site along the downstream path.
• Figure 5 Wetlands: There are no mapped Wetlands within one mile of the
Site along the downstream path.
• Figure 6 Erosion Hazard: There are mapped Erosion Hazard Areas
within one mile of the Site along the downstream path.
• Figure 7 Landslide Hazard: There are mapped Landslide Hazard Areas
within one mile of the Site along the downstream path.
• Figure 8 Seismic Hazard: There are mapped Seismic Hazard Areas
within one mile of the Site along the downstream path.
• DNRP Drainage Complaints and Studies: As shown in Figure 10,there are no
drainage complaints, within the last 10 years, within 1 mile of the Site along the
downstream path.
• Road Drainage Problems: None noted.
• USDA King County Soils Survey: See Figure 11.
• Wetlands Inventory: Vo/. 3South (1990) -The wetland inventory revealed no
additional wetlands within the downstream path.
• Migrating River Studies: None are applicable to the site.
• Washington State Department of Ecology's latest published Clean Water Act Section
303d list of polluted waters: None listed along the downstream path.
• King County Designated Water Quality Problems: None at this time.
• Adopted Stormwater Compliance Plans: None applicable to this site.
• Basin Reconnaissance Summary Reports: None available at this time
©2013 D.R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Div. II Short Plat
Page 5
City of Renton
FIGURE 4
STREAMS AND 100-YEAR FLOODPLAINS AND FLOODWAY
SITE
Ill Highlighted Feature -, County Boundary ,t '-X Mountaln Peaks
Highways ;,/
Streets /V
Jlighw~ .......... D
lo<>' ,
/s"
Parcels D
©2013 D.R. STRONG Consulting Engineers Jnc.
Level One Downstream Analysis
Legend
SAO Stream
c .... 1
Cbn2Paranni;JJ
C Ins 2 Salmon id
c1.,n 3
Und.nsifiod
Lakes alld Large River&
Streams
100 Year Floodplaln
; " . ---.-.,_):;!
Knm,._ -~ •
Saddlebrook Div. II Short Plat
Page6
City of Renton
"
" ~
•
" t ' ! ;;
~
'
~ ·-x
(
:ii ~; ~ 1:m11PL • • s1 t ~ -; § i ..• • f • a • ~ i • ' .-" a ,$' .. + !
Highlighted Feature
County Boundary
Mouhtain Peaks
Highways
Streets
t-lig.hW3)'
(cont)
FIGURE 5
KING COUNTY IMAP WETLANDS
' • ]
/
SITE
SIE1l!ST/'l ,....._,._.,,
l~P.IJ '
-;;,;;;,,;;,---"'i!l:'.lll~__J 11£ 1ST Pl
SlirlTS'TST
~ f • • ~
f ~ 3 g g
./' KE \STST
if "' ~-~ ~-~
Legend
La<al
Parcels
D Lakes and large River&
1
.,-./ Straams
lz3 SAO Wetland
,p
• • ~
Sli IGTHST
©2013 D.R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Div. II Short Plat
• ' i
• ' !
' '
' I
' a
i 4 (
"'
:.~_)3,JT
' ' ' .L
-..... ~-----.. ,
, r
-" ! .~ r
I
Page 7
City of Renton
FIGURE 6
KING COUNTY IMAP EROSION HAZARD AREAS
SITE
"
\
"
• < ~
Ill -1
I_
X
(
Highlighted Feature
County Boundary
Mountain Peaks
Highways
Streets
11,gh~
(cont)
!
!
D
;./
©2013 D. R STRONG Consulting Engineers Inc.
Level One Downstream Analysis
SE !llTflST
Arlcri:ib
Loc,i
ii·-··i41-:<;_E.l4~l!:I St
• • § !
,0
Legend
Parcels
• • ~ •
Lakes and Large Rivers
Streams
SAO Eror;ion
' SE1"ffi!ST
• • < ~ i i
S6l.milff
Saddlebrook Div. II Short Plat
• • < • i §
Page 8
City of Renton
FIGURE 7
AP LANDSLIDE KING COUNTY IM
SITE
"-,· ., ;, '~'//,
·-~:\-';; .!'.//.;'
Ill -. ·-x
Highlighted Feature
County Boundary
Mountain Peaks
Highways
Streets
IHgh~
(oont)
Legend
L<,cad
D
Parcels Rivers
Lake& and Large
/ streams
/ SAO Landslide ~
. ineers Inc. ONG Consulting Eng
HAZARD AREAS
©2013 D. R ST~tream Analysis Level One Down Saddlebrook D1v. I . I Short Plat
Page 9
City of Renton
FIGURE 8
KING COUNTY IMAP SEISMIC HAZARD AREAS
SITE
" ;[
Renton • I ,
'<! . • z 8 j, ~ • g t ~ /* I
5€2Ht>cT . / ""'°" SE2HOCT
"''"'"'
Ill Highlighted Featuro -, County Boundary ,_
X Mountain Peaks
Highways D
Streets //
; Highw.1)' ~
(cont)
©2013 D.R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis
Legend
Meri:iit;
Local
Parcels
SI> IJm1 ST SE'!llTHSf
'""'" r---.,1
k1lST/fPL :Ii.
Lakes and Large Rivers
Streams
SAO Seismic
Saddlebrook Div. II Short Plat
'"
Page 10
City of Renton
s
FIGURE 9
FEMA-FLOOD INSURANCE RATE MAP
l);f;(i
CJ
CJ
ZONE X
1J8Tf!
I
LEGEND
~Pr(]-\l IHJUIJ H~?-.>.RD ,\f,([.\~ INUNP,\(Ll)
ll',' ]rnl-YJ:,W HOOi)
ZONE A
ZONE AE ll,I" , .. ,,.r ,.r, ,,,,.,,,.,~.,,,,,,,.~.i
ZONE AH 11,,,d nr I'" I,-,,~ •,J.,.,.,11·,
"I i,,N' ]!,.,(' ,!,·,Hi••"
(iej,·,m">,<I
ZONE AO d,-;,:h , I "" l k~-, u,,,,,1;, ..f~·d
ZONE A99
ZONE V
"" •I•·;>"~ :, "·"''; .,·.n.1~,· ,~ l~i,,. ,:,1o•,m,~,·d. r,,. .,,,,1-.. , .,f!,.,,.,1 i.,,, n,,.,!,·'.~
>,•l<s<!w, ,,,~, ,l,·t<·""""'I
( , .. ,~.,! ~.,,,,1 ,,,,,, "'""'" h,,m,I '"·"·"
,UI"'" ,,., hN' ,1,.,1 ,,I,,.,,""'' dc,,,,.,,,,,,.,I
Fl.()()D\V.W Af(b\S IN zOr-.l A(
OHitR fl ()OD ARFA~
ZONE X V,·a• d '-0" )'"' 11 .. ,,1-.,,,.J, "' JC~)-\u'
,l<a,d ~,t:, ·'"''•'ilC cl,·,<h, ,,( l.-,, ,be,
1 h,, "' '"'h "'·""'"'' "~'•" le-,. 11,,,,
1 ><IY•"'' rr,le: ,,,,,f '"'"'°' p,~•,,,:,.,cf 1,1
11"<"-' /,i,o, hM·"'~" ol,~1
onirn AR~AS
ZONE X
ZONE 0
·'"'-'> ,f<-1,,,n,;ne<J '" 1~, (nO~~<' 5lM}-I'"'
1/,,dp:,,,n.
,,,,." ,, .. o;,h '''""! ,.,,.,.,1, ., .. ,,
u,·,k:,·rm·m~I
©2013 D.R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis
14
1:IBTH
-
Saddlebrook Div. II Short Plat
-
\
Page 11
City of Renton
Ill -,
I -
X
/I'
FIGURE 10
KING COUNTY IMAP DRAINAGE COMPLAINTS
SITE
~
Renton
" I I
§ ! i 4' I 4"
,s,"'
SEo'M>CT
S0l1etod Puco11
County Boundary
Mountain Ptak•
Hlgl'lw1y1,
Incorporated Arna
Streets
(cont)
'I ~;~"s", ~."'
;j !5tl~Ct N,
Legend
lhgh....-,
Artonahi
Cod
Parcol1
D l1kct1 and Largo Rlvon
;I Streamli
l:J Drainago Complalnll
0
©2013 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Div. II Short Plat
,-.,,, se,.crwsr,
i
Page 12
City of Renton
FIGURE 11
USDA KING COUNTY SOILS SURVEY MAP
AgC-Alderwood gravelly sandy loam, 6 to 15 percent slopes
Map Unit Setting
• Elevation: 50 to 800 feet
• Mean annual precipitation: 25 to 60 inches
• Mean annual air temperature: 48 to 52 degrees F
• Frost-free period: 180 to 220 days
Map Unit Composition
• Alderwood and similar soils: 95 percent
• Minor components: 5 percent
Description of Alderwood
Setting
• Landform: Moraines, till plains
• Parent material: Basal till with some volcanic ash
• Properties and qualities
• Slope: 6 to 15 percent
• Depth to restrictive feature: 24 to 40 inches to dense material
• Drainage class: Moderately well drained
• Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately
low (0.00 to 0.06 in/hr)
©2013 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Div. II Short Plat
Page 13
City of Renton
• Depth to water table: About 18 to 37 inches
• Frequency of flooding: None
• Frequency of ponding: None
• Available water capacity: Very low (about 2.5 inches)
Interpretive groups
• Land capability (nonirrigated): 4s
Typical profile
• 0 to 12 inches: Gravelly sandy loam
• 12 to 27 inches: Very gravelly sandy loam
• 27 to 60 inches: Very gravelly sandy loam
Minor Components
Norma
• Percent of map unit: 1 percent
• Landform: Depressions
Bellingham
• Percent of map unit: 1 percent
• Landform: Depressions
Seattle
• Percent of map unit: 1 percent
• Landform: Depressions
Tukwila
• Percent of map unit: 1 percent
• Landform: Depressions
Shalcar
• Percent of map unit: 1 percent
• Landform: Depressions
©2013 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Div. II Short Plat
Page 14
City of Renton
TASK3 FIELD INSPECTION
UPSTREAM TRIBUTARY AREA
In evaluating the upstream area, we reviewed King County IMAP aerial topography and
imagery and conducted field reconnaissance and have concluded that upstream
tributary area for the Site is negligible. The upstream properties developed portions
drain in southeasterly and southwesterly directions almost directly to the respective
rights of way.
GENERAL ONSITE AND OFFSITE DRAINAGE DESCRIPTION
The 0.89 acre parcel contains a single natural discharge point near the southwest
corner of the Site. The Site sheet flows towards the southwest corner of the Site and
into the right-of-way. From there, it is collected into the conveyance system within 1561h
Avenue and is conveyed south.
Runoff from the developed Site will be collected and conveyed by a typical catch basin/
pipe network to a detention pond in the southwest corner of Saddlebrook Div. I. The
pond will discharge to the conveyance system in 1561h Avenue SE.
©2013 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Div. II Short Plat
Page 15
City of Renton
TASK 4 DRAINAGE SYSTEM DESCRIPTION AND PROBLEM
DESCRIPTIONS
DRAINAGE SYSTEM DESCRIPTION
The downstream analysis is further illustrated and detailed in the Downstream Map and
Downstream Table located in Appendix A. The downstream area is located within the
Cedar River; more specifically the Lower Cedar River sub basin. The downstream area
was evaluated by reviewing available resources, and by conducting a field
reconnaissance on July 12, 2012 under overcast conditions.
Downstream Path
Point "A" is the natural discharge point of the Site. Runoff exits the Site as sheet flow to
the southwest.
From Point "A" to Point "B", runoff heads southwest as sheet flow and into a Type 1
Catch Basin located along the east side of 1561h Avenue SE. (O' -±50')
From Point "B" to Point "C", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 1 CB with a storm manhole lid. (±50'-±350')
From Point "C" to Point "D", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 1 Catch Basin. (±350' -±440')
From Point "D" to Point "E", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 1 Catch Basin. (±440' -±665')
From Point "E" to Point "F", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 2 Catch Basin. (±665' -±680')
From Point "F" to Point "G", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 2 Catch Basin. (±680' -±695')
From Point "G" to Point "H", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 2 Catch Basin. (±695' -±770')
From Point "H" to Point "I", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 2 Catch Basin. (±770' -±815')
From Point "I" to Point "J", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 2 Catch Basin. (±815' -±890')
From Point "J" to Point "K", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 2 Catch Basin. (±890' -±930')
From Point "K" to Point "L", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 1 Catch Basin. (±930' -±945')
From Point "L" to Point "M", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 1 Catch Basin. (±945' -±1,085')
From Point "M" to Point "N", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 1 Catch Basin. (±1,085' -±1, 185')
©2013 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Div. II Short Plat
Page 16
City of Renton
From Point "N" to Point "O", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 1 Catch Basin. (±1, 185' -±1,260')
From Point "O" to Point "P", runoff continues south as pipe flow via a 12-inch PVC Pipe.
The pipe connects to a Type 1 Catch Basin. (±1,260' -±1,360')
Qualitative Analysis of the downstream path continued along 1561h Avenue SE. The
analysis was concluded at the intersection of 1561h Avenue SE and SE 1441h Street.
©2013 0. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Div. II Short Plat
Page 17
City of Renton
FIGURE 12
DOWNSTREAM MAP
©2013 D.R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Div. II Short Plat
Page 18
City of Renton
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-.
I j
,---
_(_:,_~ _:::_: ..
' i,
~
-.. -~.~1,: · .... -. , ·. . . i ··I
[-.~.,-.i!I , ,
1s
d _ .. ~:l ; ;,
'I-·
I
, 1 ID -I
/
J
J
~-
· 1't1r ~-
_JhL_
J
111t
I IM
N
0
p
NORTH
GRAPHIC SCALE
0 100 200 400
1 INCH= 200 FT.
"' lli !!! OJ ili
"'"' ts ~
~5 "'"' n: ;e
c:i 8
....
~ ....
~
• I ! ~ ~
!l: ~ ~ , ~ ~
; i ~ ! i i
i li " i ~ I • o 5 ~
~ I
i Cl.. !I)
=::: :!i ~ s ::i;...., ..... ili ~ Q ~ <'( ~ !I) I:!
0 i !iS 0 Q lf: 0:: Cl Q
m
..J ~
~
DRA(T£D BY: nP
DESIGNED BY: 'l'1P
PROJECT £NG!NffR: MAJ
DA TE: 04.30.13
PROJECT NO.: 13030
"'\2013\0\13030\3\0,ow;ccs\Bcse\Repcd f;q,,es\Of 3DSJfG'2dwg 5/j/2CU HS. '7 PM PD1 E72 · 1
COPYRIGHT © 2012, D.R. STRONG CONSULTING ENGll\EERS !NC.
FIGURE 13
DOWNSTREAM TABLE
Basin: Cedar River Subbasin Name: Lower Cedar River Subbasin Number: NIA
Symbol Drainage Drainage Component Slope Distance Existing Potential
Component Type, Description From site Problems Problems
Name, and Size Discharqe
Type: sheet flow, Constrictions, under capacity, ponding,
See map swale, Stream, drainage basin, vegetation, cover, % 1 /4 mi=1,320 ft overtopping, flooding, habitat or organism
channel, pipe, depth, type of sensitive area, volume destruction, scouring, bank sloughing,
Pond; Size: diameter sedimentation, incision, other erosion
Surface area
A Natura! Discharge Sheet flow across southwest property ±0' None Observed None Anticipated
Point corner
A-B Southwesterly Sheet Sheet flow into a Type 1 CB ±50' None Observed None Anticipated
Flow
B-C Southerly Pipe Flow 12" PVC to a Type 1 CB ±350' None Observed None Anticipated
C-D Southerly Pipe Flow 12" PVC to a Type 1 CB ±440' None Observed None Anticipated
D-E Southerly Pipe Flow 12" PVC to a Type 1 CB =665' None Observed None Anticipated
E-F Southerly Pipe Flow 12" PVC to a Type 2 CB ±680' None Observed None Anticipated
F-G Southerly Pipe Flow 12" PVC to a Type 2 CB ±695' None Observed None Anticipated
G-H Southerly Pipe Flow 12" PVC to a Type 2 CB ±770' None Observed None Anticipated
H-1 Southerly Pipe Flow 12" PVC to a Type 2 CB ±815' None Observed None Anticipated
1-J Southerly Pipe Flow 12" PVC to a Type 2 CB ±890' None Observed None Anticipated
J-K Southerly Pipe Flow 12" PVC to a Type 2 CB ±930' None Observed None Anticipated
Page 19 ©2013 0. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Div. 11 Short Plat City of Renton
Observations of field inspector
resource reviewer, or resident
tributary area, likelihood of problem,
overflow pathways, potential impacts.
Trickle Flow
Trickle Flow
Trickle Flow
Trickle Flow
Trickle Flow
Trickle Flow
No Flow
No Flow
No Flow
K-L
L-M
M-N
N-0
0-P
Southerly Pipe Flow 12" PVC to a Type 1 CB
Southerly Pipe Flow 12" PVC to a Type 1 CB
Southerly Pipe Flow 12" PVC to a Type 1 CB
Southerly Pipe Flow 12" PVC to a Type 1 CB
Southerly Pipe Flow 12" PVC to a Type 1 CB
©2013 D.R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis
±945'
±1,085'
±1,185'
±1,260'
±1,360'
Saddlebrook Div. II Short Plat
None Observed None Anticipated
None Observed None Anticipated
None Observed None Anticipated
None Observed None Anticipated
None Observed None Anticipated
Page 20
City of Renton
No Flow
No Flow
No Flow
No Flow
No Flow
TASKS MITIGATION OF EXISTING OR POTENTIAL PROBLEMS
A review of the King County Water and Land Resources Division -Drainage Services
Section Documented Drainage Complaints within one mile of the downstream flow
paths revealed no complaints within the last ten years.
The project should not create any problems as specified in Section 1.2.2.1 of the
Manual and therefore is not required to provide Drainage Problem Impact Mitigation
subject to the requirements of Section 1.2.2.2.
Project runoff will be collected and released per the Manual's requirements to
accommodate Level 3 Flood Problem Flow Control and Basic Water Quality
requirements. During construction, standard sediment and erosion control methods will
be utilized. This will include the use of a stabilized construction entrance, perimeter silt
fencing, and other necessary measures to minimize soil erosion during construction.
R:\2013\0\13030\3\0ocuments\Reports\Preliminary\Level 1 OS 13030.docx
©2013 D. R. STRONG Consulting Engineers Inc.
Level One Downstream Analysis Saddlebrook Div. II Short Plat
Page 21
City of Renton
SECTION IV
FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN
As previously stated, Saddlebrook Div. II will utilize the detention facility within
Saddlebrook Div. I to meet flow control requirements. For purposes of facility sizing,
Divisions I and II will be analyzed as one project.
EXISTING SITE HYDROLOGY (PARTA)
KCRTS was used to model the peak runoff from the Site. Per Table 3.2.2.b of the
Manual the soil type is modeled as "Till" for the Alderwood gravelly sandy loam SGS
classification as shown in Figure 4. Soils. The entire Site is modeled as "Forest."
Results of the KCRTS analysis are included in this section.
Modeling input
Land cover Entire
Site
Till forest (ac) 5.544
Till Grass (ac) 0.000
Wetland (ac) 0.000
Impervious (ac) 0.000
Scale Factor: 1.00
Time Step: Hourly
Data Type: Reduced
Project location: Seatac
Total Area: 5.544
Table 1 Pre-Developed KCRTS Modeling Input
Modeling results
Entire Site
Flow Frequency Analysis
Time Series File:predev.tsf
Project ~ocation:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak.
(CFS)
0.350 2 2/09/01 18:00
0.095 7 1/06/02 3:00
0.259 4 2/28/03 3:00
0.009 8 3/24/04 20:00
0.154 6 1/05/05 8:00
0.268 3 1/18/06 21:00
0.226 5 11/24/06 4:00
0.447 1 1/09/08 9:00
Computed Peaks
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
--Peaks Rank
(CFS)
0.447 l
0.350 2
0.268 3
0.259 4
0. 226 5
0.154 6
0.095 7
0.009 8
0.415
13
Return
Period
100.00
25.00
10.00
5.00
3.00
2.00
1. 30
1.10
50.00
Prob
0.990
0. 960
0.900
0.800
0.667
0.500
0.231
0.091
0.980
Saddlebrook Div. 11
Renton, Washington
FIGURE 5. PREDEVELOPMENT AREA MAP
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
14 Saddlebrook Div. II
Renton, Washington
I
I
I
I
I !:'
I (
I
I
I
I
I
I
I
I
I
I
I
I
I
I •
i •
~· ... ·.· .. ···.· ... ··· .. \'··.··· ' '. --.. , -. . . -.
-· -. . .,
/ ' ' . .
'
·, ' >
~ ~
-1.
j._
.
. ·. ·.· .. ·.. . ,,,,,,,,,,,,,"
i ! < . . . . ,··.··· . ) : . ·-.,-· _-_·--: . -"-~--.--·_. ·:_ ·,.-~ --"·._. __ -·:_, ·-_: _. -_--· __ ·_·_ _. ·._· .. _-: ~;-~e--~ -
, ... I
Ii
' I
I
I ,
I
I
AREA BREAKDOWN
TOTAL EXISTING SITE AREA:
TOTAL PROJECT AREA:
TOTAL PROJECT DEVELOPMENT AREA:
228,512 SF. (5.25 ACRES)
241,515 SF. (5.54 ACRES)
241,515 S.F. (5.54 AC)
MODELED AS TILL FOREST
I
I
'
' ' '
'j i
i'
v 36 '.',·_ )( V X X Y { X X X-?(X X X/))'Y\:Iv-,. ,
LEGEND
---PROJECT BOUNDARY
~ TILL FOREST
··c.1 r ,
·1,,
', I'• I,' •• , I
@
NOR.TH
GRAPHIC SCALE
0 40 80 120
1 INCH= 80 FT.
R: \2013\0\1.30J0\.\\1r8'~-:ngs\8ose \;;>P.port H~1.res \01., 3FIG513030. dwg 5/3/20i 3 11: 07: 17 AM PD-
COPYRI-JHT @ 2012, D.R. STRONG CONSUL TING [NGIN[ERS INC.
"' lli !!l C,
~
~~ Q j::
~ 5 ~ ~ a: 0 <:i Cl
....
~
),..
Et:
~ i ~ ~ ~
!k: ti ~ ~ ~ ~
~ fJ ~ ffi Sc lL.
! ! ~ ~ i ~ ~ ~ 0 ~ I
~ ).. I 8~;s ..... 5 !-LI 1-C-
l.lJ ~~~ a: ~~5: :J:: "'( (/)
::::: ~ i!: ~ s ii5 lg :.::· i5 (!) .... Q
::: £\I 1-C-~ § ~lG g ~-~
I L(j .....
is
~
{)RAFTED BY. YLP
!HSIGN/:1) BY· YIP
· 1-Ro.1r·c1 f-Nr;/NffR MAJ
DA TE: 04.30.13
PROJECT NO.: 13030
f1GURt 5 )
DEVELOPED SITE HYDROLOGY (PART B)
Soil type
The soil types are unchanged from pre-developed conditions.
Land covers
KCRTS was used to model the developed peak runoff from the Site. The portions of
the Site within the proposed clearing limits tributary to the proposed detention pond
were modeled as "Till Grass" and Impervious as appropriate. Results of the KCRTS
analysis are included in this section.
Modeling input
Land cover Entire
Site
Till forest ( ac) 0.000
Till Grass (ac) 2.540
Wetland (ac) 0000
Impervious (ac) 2.857
Scale Factor: 100
Time Step: Hourly
Data Type: Reduced
Project location: Seatac
Total Area: 5.397
Table 2 Developed KCRTS Modeling Input
Detailed Impervious Area Breakdown:
TOTAL LOT AREA= 169295 S.F.
TOTAL R.O.W. AREA= 39688 S.F.
TRACT A AREA (DIV. I) = 20130 S.F.
TRACT A AREA (DIV. II)= 4412 S.F.
TRACT B AREA (DIV. II)= 1554
IMPERVIOUS= 70278 S.F.
100% IMPERVIOUS= 39688 S.F.
50% IMPERVIOUS= 10065 S.F.
IMPERVIOUS= 4412 S.F.
IMPERVIOUS= 0 S.F.
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
15
PERVIOUS = 99017 S.F.
0% PERVIOUS
50% PERVIOUS = 10065 S.F.
PERVIOUS = 0 S.F.
PERVIOUS = 1,554 S.F.
Saddlebrook Div. II
Renton, Washington
Modeling Results
Saddlebrook Div. I and Div. II
Flow Frequency Analysis
Time Series File:rdin.tsf
Project Location:Sea-Tar,
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
0.920 6 ?/09/01 2:00
0. 726 8 1/05/02 16:00
1.11 3 2/27/03 7:00
0.759 7 8/26/04 ?:00
0. 920 5 10/28/04 16:00
0.973 4 1/18/06 16:00
1.10 ? 10/26/06 0:00
1. 89 1 1/09/08 6:00
Computed Peaks
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
-----Flow Frequency Analysis-------
--Peaks
(CFS)
l. 89
1.11
1.10
0. 973
0.920
0. 920
0.759
0. 726
1. 63
16
Rank
1
2
3
4
5
6
7
8
Return
Period
100.00
25.00
10.00
5.00
3.00
2.00
1. 30
1.10
50.00
Prob
0.990
0. 960
0.900
0.800
0.667
0.500
0.231
0. 091
0.980
Saddlebrook Div. II
Renton, Washington
BYPASS AREA HYDROLOGY
Modeling input
Land cover
Till forest (ac)
Till Grass (ac)
Wetland (ac)
Impervious (ac)
Scale Factor:
Time Step:
Data Type:
Project location:
Total Area:
Entire
Site
0.000
0.053
0.000
0.095
1.00
Hourly
Reduced
Seatac
0.148
Table 3 Bypass KCRTS Modeling Input
Modeling results
Bypass
Flow Frequency Analysis
Time Series File:bypass.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak -Peaks Rank Return Prob
(CFS) (CFS) Period
0.028 5 2/09/01 2:00 0.056 1 100.00 0.990
0.023 8 1/05/02 16:00 0.036 2 25.00 0. 960
0.034 2 2/27/03 7:00 0.034 3 10.00 0.900
0.025 7 8/26/04 2:00 0.030 4 5.00 0.800
0.029 6 10/28/04 16:00 0.029 5 3.00 0.667
0.030 4 1/18/06 16:00 0.028 6 2.00 0.500
0.036 3 10/26/06 0:00 0.025 7 1. 30 0.231
0.056 1 1/09/08 6:00 0.023 8 1.10 0.091
Computed Peaks 0.049 50.00 0.980
The flow control facility is designed to compensate for uncontrolled bypass. The 1 OD-
year discharge from the bypass areas is 0.056 cfs, which is less than the 0.4 cfs
threshold. There should be no adverse downstream impacts to the downstream
drainage system created by the runoff from the bypass.
There is a bypass area associated with each TOA of Saddlebrook Div. I. For purposes
of detention calculations, both bypass areas were used as the approved drainage
adjustment calls for a combination of the TDA's.
The onsite bypass areas satisfy all the requirements set forth in the Manual, Section 1.2
with the exception of TOA East (Saddlebrook Div. I) as it pertains to convergence with
the downstream path of the facility within a quarter mile. This is further detailed in the
following section.
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
17 Saddlebrook Div. II
Renton, Washington
FIGURE 6. POST DEVELOPMENT AREA MAP
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
18 Saddlebrook Div. II
Renton, Washington
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
i I
I -
1////
•i I,
0
~
D
D
II
AREA BREAKDOWN
TOTAL EXISTING SITE AREA:
TOTAL PROJECT AREA:
LOT AREA (COLLECTED):
IMPERVIOUS:
TILL GRASS:
ROW AREA (COLLECTED):
IMPERVIOUS:
TILL GRASS:
TRACT A DIV. I AREA (COLLECTED).
IMPERVIOUS:
TILL GRASS:
TRACT A/B DIV. II AREA (COLLECTED):
IMPERVIOUS:
TILL GRASS:
BYPASS:
IMPERVIOUS:
TILL GRASS:
/ +I
"---------"--• -+ -~cz:. -:-· _. ~.
..... ..... ..... ..... ..... .....
/ /
228,512 S.F. (5.25 ACRES)
241,515 S.F. (5.54 ACRES)
169,295 S.F. (3.886 AC)
70,278 S.F. (1.613 AC)
99,017 S.F. (2.273 AC)
39,688 S.F. (0.911 AC)
39,688 S.F. (0.911 AC)
0
20,130 S.F. (0.462 AC)
10,065 S.F. (0.231 AC)
10,065 S.F. (0.231 AC}
5,966 S.F. (0.137 AC)
4,412 S.F. (0.101 AC)
1,554 S.F. (0.036 AC)
6,436 (0.148 AC)
4,143 (0.095 AC)
2,293 (0.053 AC)
LEGEND
---PROJECT BOUNDARY
(
I I
. I I I L I
1 I !~~~~~~%?~~I~.
5 UJ ' ~ CJ)
~
"(
i'::
~ -
• -~-. . ~-..... "..... ..... ,.. -. V W ..... . .
..... " "" "' "'
•
.., TRACT"A""' • Q. 1,
• •
• •
//
).-'.•,-
/// ///
I i1l ~····1~ • I~
~
~
"(
i
::':
@
NOR.TH
GRAPHIC SCALE
0 40 80 120
1 INCH= 80 FT.
R: \2013\0\ 13030\3\Crowings\Bose\Reµur/ Fi!Jores\01-Jn{;(,/.3030.dwg 5/11/2013 1:25:03 PM PDT
:::CP'f:''ICHT (D 2012. CY SIRDrJG C~:~h'.Jl 1tt\G ENGIN[['xS INC.
~ Ill ;;,;
(.')
iii
(.') (.')
~~
I!': s
"'"' re ~ Ci 0
I-
~
I-:,..
" i ~ S M ~ ~;· ~ ~ ~ . ~ ffi 5( ~
! ! ~ ~ j; ~
1H ~ "If
:ii; !!l C) ~ I
Q:: (!)
0 a LJJ~ ~ a~e 0:: :::i C!)
::::: ~ ;;!:: ;;!:: s :i: ~ ~
-~ "( ::I: Cl U)~~
~ @~~-
~ ~ f.::. 0 ,_,~nj m ~ -0::
LU ~
2
~
DRAFTED BY: YLP
DES!GN[D BY: Yl.P
PROJECT ENGINEER: MAJ
DAT£: 04.30.13
PROJECT NO.: 13030
FIGURE: 6 J
PERFORMANCE STANDARDS (PART C)
The Project is required to meet the Level 3 Flow Control and Basic Water Quality
Treatment requirements. The Level 3 performance requires the developed condition
discharge rates to match the predeveloped rates ranging from 50% of the two-year
peak up to the 50-year peak. Also match developed peak discharge rates to
predeveloped peak discharge rates for the 2-, 10-and 100-year return periods.
The Basic Water Quality Treatment goal is to remove 80% of TSS for flows or volumes
up to and including the WQ design flow or volume.
Conveyance criteria for the Project require that all new pipes be designed to convey
and contain (at minimum) the 25-year peak flow.
FLOW CONTROL SYSTEM (PART D)
Both Saddlebrook Div. I and Div. II will utilize a detention pond meeting the Level 3
Flow Control Criteria. The King County Runoff Time Series (KCRTS) software was
used to size the detention facility. The detention pond design information is included in
this section.
FLOW CONTROL BMP SELECTION
Subdivision projects are required to mitigate for impervious surface equal to a minimum
of 10% of each lot area by use of Flow Control Best Management Practices (BMP's).
Projects are required to first analyze the feasibility of dispersal and infiltration before
choosing another method. The Site will utilize basic dispersion with the use of splash
blocks. Two splash blocks mitigating a total of 1,400 s.f. of impervious area, will be
installed with each residence. This shall mitigate for 12.75% to 13.66% of impervious
area for each lot. Also, each lot will be restricted to an area less than 4,000 s.f. (see
table below).
ROOF AREA ROUTED TO
LOT NO. LOT AREA (S.F.) SPLASH BLOCK (S.F.)
1 10249 1400
2 10983 1400
3 10877 1400
© 2013 D.R. STRONG Consulting Engineers lnc.
Technical Information Report
RESTRICTED IMPERVIOUS
AREA PER LOT
3505
3485
3885
19
TOTAL AREA
MITIGATED
1895
1915
1515
PERCENT IMPERVIOUS
MITIGATED
18.49
17.44
13.93
Saddlebrook Div. II
Renton, Washington
FLOW CONTROL SYSTEM
The Project will utilize one detention pond to meet Level Three Flow Control criteria for
the Site. The King County KCRTS software was used to size the detention facility.
Saddlebrook Div. I and Saddlebrook Div. II
Retention/Detention Facility
Type of Facility: Detention Pond
Side Slope: 3.00 11:lV
Pond Bottom Length: 71. 50 ft
Pond Bottom Width: 71. 50 ft
Pond Bottom Area: 5112. sq. ft
Top Area at 1 ft. FB: 14496. sq. ft
0.333 acres
Effective Storage Depth: 7.15 ft
Stage O Elevution: 488.35 ft
Storage Volu::ne: 62868. cu. ft
1.443 ac-ft
Riser Head:
Riser Diameter:
Number of orifices:
Ori.fice #
1
2
3
Height
(ft)
0.00
4. 95
6.37
7.15
18.00
3
Diameter
(in)
1.11
2.14
2.54
Top Notch Weir: None
Outflow Rating Curve: None
ft
inches
Full Head
Discharge
(CFS)
0.090
0.185
0.155
Pipe
Diameter
(in)
6.0
6.0
Stage Elevation Storage Discharge Percolation
(ft) (ft) (cu. ft)
0.00 488.35 0.
0.01 488.36 51.
0.02 488.37 102.
0.03 488.38 151.
0.05 488.10 257.
0.06 4 88. 4 J. 308.
0.07 488.42 360.
0.08 488.43 412.
0.09 488.44 4 64.
0.10 488.45 516.
0.24 488.59 1252.
0.38 488.73 2005.
0.53 488.88 2832.
0.67 489.02 3621.
0.81 489.16 4 429.
0.95 489.30 5254.
1. 09 489.44 6097.
1. 23 489.58 6959.
1. 37 489.72 7839.
1. 51 489.86 8739.
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
(ac-ft) (cfs) (cfs)
0.000 0.000 0.00
0.001 0.004 0.00
0.002 0.005 0.00
0.004 0.006 0.00
0.006 0.007 0.00
0.007 0.008 0.00
0.008 0.009 0.00
0.009 0.010 0.00
0. 011 0.010 0.00
0.012 0. 011 0.00
0.029 0.017 0.00
0. 04 6 0.021 0.00
0.065 0.024 0.00
0.083 0.027 0.00
0.102 0.030 0.00
0.121 0.033 0.00
0.140 0.035 0.00
0 .160 0.037 0.00
0.180 0.039 0.00
0.201 0.041 0.00
20
Surf Area
(sq. ft)
5112.
5121.
5129.
5138.
5155.
5164.
5172.
5181.
5189.
5198.
5320.
5443.
557'1.
5703.
5831.
5959.
6090.
6222.
6355.
6490.
Saddlebrook Div. II
Renton, Washington
l. 65 490.00 9657. 0.222 0.043 0.00 6626.
1. 79 4 90. 14 10594. 0.243 0.045 0.00 6763.
1. 93 490.28 11550. 0. 265 0.047 0.00 6902.
2.07 490.42 12526. 0.288 0.048 0.00 7042.
2.21 490.56 13522. 0.310 0.050 0.00 7184.
2.35 4 90. 7 0 14538. 0.334 0.052 0.00 7327.
2.49 490.84 l~:574. 0.358 0.053 0.00 74·11.
2.63 490.98 16630. 0.382 0.055 0.00 7617.
2.n 4 91. 12 17707. 0.406 0.056 0.00 77 65.
2.91 491.26 18804. 0.432 0.057 0.00 7913.
3.05 491.40 19973. 0.457 0.059 0.00 8064.
3.19 491.54 21062. 0.484 0.060 0.00 8215.
3.33 491.68 22223. 0.510 0.061 0.00 8368.
3.47 491.82 23405. 0.531 0.063 0.00 8523.
3.61 491.96 24609. 0.565 0.064 0.00 8678.
3.75 492.10 25835. 0.593 0.065 0.00 8 836.
3.89 492.74 27083. 0.622 0.066 0.00 8994.
4.03 4 92. 38 28354. 0.651 0.068 0.00 9154.
4. 17 4 92. 52 2964 7. 0.681 0.069 0.00 9316.
4.31 492.66 30962. 0.111 0.070 0.00 94 7 9.
4.45 4 92. 80 32301. 0.742 o. 071 0.00 9643.
4.59 192. 94 33662. 0. 773 0.072 0.00 9808.
4.73 493.08 35047. 0.805 0.073 0.00 9976.
4.87 493.22 36455. 0.837 0.074 0.00 10144.
4.95 493.30 37271. 0. 856 0. 0/5 0.00 10241.
4. 97 493.32 37476. 0. 860 0.076 0.00 10265.
4.99 493.34 37681. 0.865 0.080 0.00 10290.
5.02 493.37 37991. 0. 872 0.086 0.00 10326.
5.04 493.39 38197. 0. 877 0.094 0.00 1.0351.
5.06 493.41 38405. 0.882 0.105 0.00 10375.
5.08 4 93. 4 3 38612. 0.886 0.117 0.00 10399.
5 .11 4 93. 4 6 389?,5. 0.894 0.125 0.00 10436.
5 .13 493.48 39134. 0.898 0.129 0.00 10461.
5. 27 493.62 40610. 0.932 0 .148 0.00 10633.
5.41 4 93. 7 6 42111. 0. 967 0.163 0.00 10807.
5.55 493. 90 43637. 1. 002 0.176 0.00 10983.
5.69 494.04 45186. l. 037 0.188 0.00 11159.
5.83 494.18 46761. 1. 073 0.198 0.00 11338.
5. 9'/ 4 94. 32 48 361. 1.110 0.208 0.00 11517.
6.11 49C46 49986. 1. 14 8 0.218 0.00 11698.
6. 25 4 94. 60 51637. 1.185 0.226 0.00 11881.
6.37 4 94. 72 53072. l. 718 0.234 0.00 12038.
6.40 494.75 53433. 1. 227 0.237 0.00 12078.
6.42 494.77 53675. 1.232 0.243 0.00 12104.
6.45 494.80 54039. 1. 241 0.253 0.00 12144.
6. 4 8 494.83 54c04. 1. 249 0.266 0.00 12183.
6.50 494.85 54 648. 1. 255 0.281 0. 00 12210.
6.53 491.88 55015. 1.263 0.300 0.00 12250.
6.56 494.91 55383. 1.271 0.320 0.00 12289.
6.58 4 94. 93 55629. 1.277 0.326 0.00 12316.
6.61 4 94. 96 5:,999. 1. 286 0.333 0.00 12356.
6.75 195.10 57742. 1. 326 0.362 0.00 12544.
6.89 495.24 59511. 1. 366 0.388 0.00 12732.
7.03 495.38 61307. 1. 4 07 0. 411 0.00 129n.
© 2013 D. R. STRONG Consulting Engineers Inc. 21 Saddlebrook Div. II
Technical Information Report Renton, Washington
7.15 495.50 62868. 1. 443 0.430 0.00
7.25 495.60 64183. 1. 473 0.906 0.00
7.35 495.'/0 65512. 1. 504 1. 760 0.00
7.45 495.80 66856. 1.535 2.870 0.00
7.55 495.90 68213. 1. 566 4.180 0.00
7. 65 4 96. 00 69584. 1. 597 5.660 0.00
7.75 496.10 70969. 1. 629 7.100 0.00
7.85 496.20 72369. 1.661 7.640 0.00
7.95 496.30 73782. 1.694 8.140 0.00
8.05 496.40 75210. 1. 727 8.620 0.00
8.15 496.50 76653. 1. 760 9.060 0.00
8.25 4 96. 60 78110. 1. 7 93 9. 4 90 0.00
8.35 496. 70 7 9581. 1. 827 9.900 0.00
8.45 496.80 81067. 1. 8 61 10.290 0.00
8.55 196. 90 82567. 1. 895 10.660 0.00
8. 65 4 97. 00 84083. 1. 930 11. 030 0.00
8.75 497.10 85613. 1. 965 11. 380 0.00
8.85 497.20 87158. 2.001 11.720 0.00
8.95 497.30 88718. 7.037 12.050 0.00
9.05 4 97. 10 90293. 2.073 12.370 0.00
Hyd Inflow Outflow Peak Storage
Stage Elev (Cu-Ft) (Ac-Ft)
1 1. 89 0.43 7.15 495.50
2 0.92 0.35 6.69 495.04
3 1.11 0.22 6.16 494.51
4 0.92 0. 21 6.04 4 94 . 3 9
5 0. 97 0.15 5.32 4 93. 67
6 0.57 0.08 4. 95 493.30
7 0.73 0.07 1. 27 4 92. 62
8 0.76 0.06 3.02 491.37
Hyd R/D Facility Tributary Reservoir
Outflow Inflow Inflow
1 0.43 0.06 ********
2 0.35 0.03 ********
3 0.22 0.03 **7'.·"A·*-J"**
4 0.21 0.03 *******·k
5 0.15 0.03 ********
6 0.08 0.02 ********
7 0.07 0. 0?. ********
8 0.06 0.02 ·k·k*-k****
Route Time Series through Facility
Inflow Time Series File:rdin.tsf
Outflow Time Series File:rdout
POC Time Series File:dsout
Inflow/Outflow Analysis
Peak Inflow Discharge:
Peak Outflow Discharge:
Peak Reservoir Stage:
Peak Reservoir Elev:
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
1. 89 CFS
0.432 CFS
7.15 Ft
495.50 Ft
22
62870. 1.443
56962. 1.308
50523. 1.160
49188. 1.129
41150.
37295.
30617.
19659.
~oc Outflow
Target Cale
0.45 0.44
*****"'* 0.36
* ·k -;..--is· ·k ·k ·/.: 0.23
***·k·k** 0.22
******* 0.16
******* 0.08
******* 0.08
-Jc!d< ·k * ·k * 0.08
at 6:00 on J'an
at 11: 00 on Jan
0.945
0.856
0.703
0. 451
9 in
9 in
13087.
13224.
13363.
13502.
13642.
13782.
13923.
14065.
14208.
14 352.
14496.
14640.
14786.
14932.
15079.
15227.
15375.
15525.
15 67 4.
15825.
Year 8
Year 8
Saddlebrook Div. II
Renton, Washington
Peak Reservoir Storage: 62870. Cu-Ft
1.443 Ac-Ft
Add Time Series:bypass.tsf
Peak Sumn1ed Discharge: 0.444 CFS at 11:00 on Jan 9 in Year 8
Point of Compliance File:dsout.tsf
Flow Frequency Analysis
Time Serles File:rdout.tsf
Project Locat.ion:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
0.353
0.070
0 .221
0.059
0.07:,
0.153
0. 213
0.432
Computed Peaks
2 2/09/01 20:00
7 1/07/02 4:00
3 3/06/03 22:00
8 8/26/04 7:00
6 1/08/05 5:00
5 1/19/06 2:00
4 11/24/06 9:00
1 1/09/08 11:00
Flow Frequency Analysis
Time Series File:dsout.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
0.361 2 2/09/01 20:00
0.081 7 1/05/02 16:00
0.228 3 3/06/03 21:00
0. 077 8 8/26/04 2:00
0.083 6 1/0o/05 8:00
0.157 5 1/19/06 1:00
0.220 4 11/24/06 7:00
0.444 1 1/09/08 11: 00
Computed Peaks
-----Flow Frequency Analysis-------
--Peaks --Rank Return Prob
(CFS) (ft) Period
0.432 7.15 1 100.00 0.990
0.353 6.70 2 25.00 0. 960
0. 221 6.16 3 10.00 0.900
0. 213 6.04 4 5.00 O. 800
0.153 5.32 5 3.00 0.667
0.075 4.95 6 2.00 0.500
0.070 4. 27 7 1. 30 0. 231
0.059 3.02 8 1.10 0.091
0.405 7.00 50.00 0. 98 0
-----Flow Frequency Analysis-------
--Peaks
(CFS)
0.444
0.361
0.228
0.220
0.157
0.083
0.081
0. 077
0.416
Rank
1
2
3
4
5
6
7
8
Return Prob
Period
100.00 0.990
25.00 0. 960
10.00 0.900
5.00 0.800
3.00 0.667
7.00 0.500
1. 30 0.231
1.10 0.091
50.00 0.980
Flow Duration from Time Series File:rdout.tsf
Cutoff Count Frequency CDF
CFS % %
O.C05 33549 54.711 54.711
0.015 6223 10.148 64.860
0.025 5918 9. 651 74.511
0.035 4748 7.743 82.254
0.045 4536 7.397 89.651
0.055 2455 4.004 93.655
0.064 2006 3.n1 96. 92 6
0.074 1439 2.347 99.273
0.084 110 0.179 99.452
0.094 23 0.038 99.490
0.104 14 0.023 99.512
0.114 11 0.018 99.530
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
Exceedence
%
45.289
35.140
25.489
17.746
10. 34 9
6.345
3.074
0. 727
0.548
0.510
0.488
0.470
23
Probability
0.453E+OO
0.351E+OO
0.255E+OO
O. l 77E+OO
0.103E+OO
0.635E-01
0.307E-Ol
0. '/?)E-02
0.548E-02
0.510E-02
0. 488E-02
0.470E-02
Saddlebrook Div. II
Renton, Washington
0.124 26 0.042 99.573 0.427 0.427E-02
0.134 29 0.047 99.620 0.380 0.380E-02
0.144 38 0.062 99.682 0.318 0. 318E-02
0.154 35 0.057 99.739 0.261 0.261E-02
0.163 19 0.031 99. 770 0.230 0.230E-02
0.173 25 0.041 99. 811 0.189 0.189E-02
0.183 16 0.026 99.837 0.163 0.163E-02
0 .193 15 0.024 99.861 0.139 0 .139E-02
0.203 18 0.029 99. 8 91 0.109 0.109E-02
0. 213 19 0.031 99.922 0.078 0.783E-03
0.223 19 0.031 99.9S3 0.047 0. 4 73E-03
0.233 14 0.023 99.976 0.024 0.245E-03
0.243 2 0.003 99.979 0.021 0.212E-03
0.253 2 0.003 99.982 0.018 0.179E-03
0.263 1 0.002 99.984 0.016 0.163E-03
0 .272 0 0.000 99.984 0.016 0.163E-03
0.282 1 0.002 99.985 0.015 0.147E-03
0.292 0 0.000 99.985 0.015 0.147E-03
0.302 1 0.002 99.987 0.013 0 .130E-03
0.312 1 0.002 99.989 0. 011 0 .114E-03
0.322 0 0.000 99.989 0. 011 0 .114E-03
0.332 2 0.003 99.992 0.008 0.815E-04
0.342 1 0.002 99.993 0.007 0.652E-04
0.352 3 0.005 99.998 0.002 0.163E-04
Flow Duration from Time Series File:dsout.tsf
Cutoff Count Frequency CDF Exceede!lce Probability
CFS % % %
0.005 33512 54.651 54.651 45.349 0.453E+00
0.015 6220 10.144 64.795 35.205 O.J52E+OO
0.025 5951 9.705 74.499 25.501 0.255E+OO
0.036 4709 7. 679 82.179 17. 821 0.178E+OO
0. 04 6 4486 7.316 8 9. 4 94 10.506 0.105E+OO
0.056 25'/8 4.204 93.699 6.301 0.630E-01
0.066 1922 3.134 96. 833 3 .167 0.317E-01
0.076 1411 2.301 99.134 0.866 0.866E-02
0.086 175 0.285 99.119 0.581 0.581E-02
0. 096 36 O.OS9 99.418 O.S?2 0. 522F.-02
0.106 22 0.036 99.514 0.486 0.486E-02
0 .117 11 0.018 99.532 0. 4 68 0. 4 68E-02
0.127 25 0.041. 99.573 0.427 0.427E-02
0.137 26 0.042 99.615 0.385 0.385£-02
0.147 34 0.055 99.671 0.329 0.3292:-02
0.157 43 0.070 99.741 0.259 0.259E-02
0.167 19 0.031 99. 772 0.228 0.228E-02
0.177 24 0.039 99. 811 0.189 0.189E-02
0.188 16 0.026 99.837 0.163 0 .163E-02
0.198 15 0.024 99.861 0.139 0.139E-02
0.208 18 0.029 99.891 0 .109 0.109E-02
0.218 18 0.029 99.920 0.080 0.799E-03
0.228 18 0.029 99.949 0.051 O.S06E-03
0.238 14 0.023 99. 972 0.028 0.277E-03
0.248 3 0.005 99.977 0.023 0.228E-03
0.258 2 0.003 99.980 0.020 0.196E-03
© 2013 D.R. STRONG Consulting Engineers Inc. 24 Saddlebrook Div. II
Technical Information Report Renton, Washington
0.269 ? 0.003 99.984 0.016 0.163E-03
o.n9 0 0.000 99.984 0.016 0.163E-03
0.289 1 0.002 99.985 0.015 0.147E-03
0.299 0 0.000 99.985 0.015 0.147E-03
0.309 0 0.000 99.985 0.015 0 .14 7E-03
0.319 2 0.003 99.989 0. 011 O.lHE-03
0.329 0 0.000 99.989 0. 011 0. ll.4F.-03
0.340 1 0.002 99.990 0.010 0.978E-04
0.350 3 0.005 99.995 0.005 0.489E-04
0.360 1 0.002 99.997 0.003 0.326E-04
Duration Comparison Anaylsis
Base File: predev.tsf
New File: dsout. tsf
Cutoff Units: Discharge in CFS
-----Fraction of Time--------------Check of
Cutoff Base ::-::'ew %Change Probability Base
0. 077 0.95E-02 0.81E-02 -14.6 I 0.95E-02 0.077
0.098 0.63E-02 0.52E-02 -18.3 I 0.63E-02 0.098
0 .119 0.50E-02 0.46E-02 -6.3 I 0.50E-02 0.119
0.140 0.37E-02 0.37E-02 -0.1 I 0.37E-02 0.140
0.161 0.29E-02 0.25E-02 -14.2 I 0.29E-02 0.161
0.182 0.22E-02 0.18E-02 -17. 8 I 0.22E-02 0.182
0.203 O.lSE-02 0.13E-02 -13. 3 I O.lSE-02 0.203
0.224 O.lOE-02 0.65E-03 -36.5 I O.lOE-02 0.224
0.245 0. 62E-03 0.23E-03 -63.2 I 0.62E-03 0.245
0.266 0.34E-03 0.lSE-03 -47.6 I 0.34E-03 0.266
0.287 0. 21E-03 0.15E-03 -30.8 0.21.E-03 0.287
0.308 0.16E-03 0.15E-03 -10.0 0.16E-03 0.308
0.328 0.98E-04 0.111::-03 16. 7 0.98E-04 0.328
0. 34 9 0.16E-04 0.49E-04 200.0 0.16E-04 0.319
Maximum positive excursio~ = 0.022 cfs 6.4%)
occurring at 0.338 c=s on the Base Data:predev.tsf
and at 0.360 cfs on the New Data:dsout.tsf
Maximum negative excursion= 0.020 cfs (-18.4%)
occurring at 0.107 cfs on the Base Data:predev.tsf
and at o.oa·, cfs on the New Data:dsout.tsf
© 2013 D. R. STRONG Consulting Engineers lnc.
Technical Information Report
25
Tolerance-------
New
0.075
0.082
0.104
0.139
0.154
0.169
0.194
0. 211
0.225
0.235
0.251
0.285
0.340
0.361
%Change
-1. 8
-15.8
-12.7
-0.2
-4.2
-6.9
-4.0
-5.6
-8.0
-11. 4
-12.2
-7.5
3.4
3.2
Saddlebrook Div. II
Renton, Washington
Peaks Plot
, rdoul pks in Sea-Tac
• -dsoutpks
' µredev p!cs
10-1_
• in
"-0
\!,
• e' ro
~
~ -
5
10·2 :
-
-
" -
-
10·3
1 2 5 10 20
Duration Curve ..
0
000
;;+-----------
00
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
" • 0
30
Return P~riod
2 5
R
000 0 --v-•
0 •
! 00 ---~~----
40 50 60 70 80
Cumulative Probability
Pmbabilil Exceedence
26
10
' •
90
20 ----'-
95
50 100
Q
98 99
rdout dur <>
dsout.dur •
1arget dur c
Saddlebrook Div. II
Renton, Washington
FLOW CONTROL PRIMARY OVERFLOW
Using standard orifice equation to determine stand pipe diameter in control structure
Ref. KCSWDM '09 Figure 5.3.4.H
0 100 = 100-Year Peak Storm calculated using KCRTS 15-Minute Time Steps
0100 = 4.65 cfs
HMAX = Maximum available head in feet measured from crest of weir
0.75 ft.
D = Riser Diameter
D = (0100 / (3.782 * HMAX0'5))05
D = 1.19 ft. (min. diameter) round up to nearest standard pipe diameter
use D = 18 in. or 1.5 ft.
Calculate actual height above the weir expected during the 100-year peak storm
H = Actual head above weir achieved with 0 100
H = (0100 I (9. 739 * D))'0.67
H = 0.47 ft.
JAILHOUSE SECONDARY OVERFLOW
Using standard weir equation to determine length of window opening in control structure
Ref. KCSWDM '09 Figure 5.3.4.E
D= Control structure diameter
D= 60 in.
0 100= 100-Year Peak Storm calculated using KCRTS 15-Minute Time Steps
0100= 4.65 cfs
HMAX= Head above weir achieved with 0 100
HMAX= 0.47 ft.
P= Height of overflow above outlet invert elevation
P= 7.15 ft.
c= Constant
c= 3.27+0.4*HMAxiP
C= 3.30 ft.
L= Arc length of the jailhouse window as necessary but not to exceed 50% of
the control structure's internal circumference
L= (0100 /(c*HMAx 1
·51 )+0.2*HMAx
L= 4.47 ft. (min. length)
C= Control Structure Circumference
C= 16 ft.
Calculate corrected L due to vertical bars in window.
Laai= adjusted arc length of the jail-house window
Laai= L +0.083*(L/0.33)
Laaj= 5.60 ft.
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
27 Saddlebrook Div. II
Renton, Washington
BIRDCAGE EMERGENCY OVERFLOW SPILLWAY
Using sharp crested weir equation to determine stand pipe diameter in control structure
Ref. KCSWDM '09 Figure 5.3.4.E
0 100 = 100-Year Peak Storm calculated using KCRTS 15-Minute Time Steps
0100= 4.65 els
P= Height of primary overflow above outlet invert elevation
P= 7.62 ft.
D= Control structure diameter
D= 60 in.
L= Control structure circumference
L= 15.71 ft.
C= 3.27+0.4H/P (ft)
use ..
0100= 3.27+0.4H/P(L-0.2H)HA1 .5
H= Emergency overflow water surface elevation
H= 0.20 ft.
WATER QUALITY TREATMENT (PART E)
The Project is located in the Basic Water Quality (WQ) Treatment area. The Project
will utilize a BayFilter vault meeting Basic Water Quality treatment criteria. See Figure
7 for details.
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
28 Saddlebrook Div. II
Renton, Washington
FIGURE 7. DETENTION FACILITY DETAILS AND BAYFILTER SIZING
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
29 Saddlebrook Div. II
Renton, Washington
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I s ;,;
' ~
I
I
~
' 1
!
' j
'.>
~
I f ,
I
1
8
~
"" 0
0 a: co w
_J
0
0 ..,:
(fJ
18 SE 1/4 SE OF SECTION 32, TOWNSHIP 23N, RANGE 5£, W.M. ,-
SADDLE BROOK
I ,.
4• INLH
OR!F!Cf
/8" INLH
RUfJBfR
'""
SOUD TOI'
fOM ~ 4!15-00 rouna
0RlflC£
LsL Mf"IR W)LL Al SOI.ID TOP
R!M~ 196.00
M'.i.R
CREST -4/lB 27
12" OUTLH PIPC IN\l[RT -485 S7
f" OU TLfT PIP£
/N',f;RT -485.97
PLAN VIEW
$}C;Q1pN A_A_
18" l~'L[T P1PE
/N\l[flj -488.27
4" OR/FIC[ TO
Fil Tf:RS !N'.lfRT -
486.47 NOT£: INLET A~'D
OUTI.H PIPE NOT
51/0~i.J FDR
CLARITY
OUTLE:T IN\/.
[LEY
485 ~7
SECTION 8 B
78" Mli
P!IH!M!NARY SIZING SUMMARY
BAYFII ffR STC.~UWAllR fflr:AW{NT SYST[M
~::.;, ~;ORJ!WA-~R U~~AC£i,!£NT SYSTEM IS Al
STOR.1/WATE'I FILTRATION onia: OES!CNW ro f/£1.JO\lc .
fJNt· SWIMWJS, HEAVY MUALS, AND PHOS.~HORUS.
t----------~-----------j TIIF fl A Ynl T[R SYST[!J !IH/£5 ON A SPIRAL WOUNO
PROJtCf SACDLEBROO><: M[DIA Fn.TF:R CA.RTR1Q(;€ ~TH APPROXl((ATE:cY 4J
t--------------j------------j SOOAR[ {[fr CF {/[ TRA non .'.R[A.. TH[ Fil TER
LOCAi/ON RfNTON, WA CARfmOGfS MIC HOUSED IN A CONC,RH[ STRUCTUP[
t-------------j------------j THAT EVfNlY 01STRIBUT£S THE FLOW BfTM'.[N
WAl!"R DUALITY now 0.ClS CFS CAF0Rl[)0£S. Tr/£ SYSlfM IS Off/.lN[ ','/ITH AN
CKirnWL BYPASS TH.'<T R0Ur£S HIGI-! /llr£11S!TY
DRA!NAG{ AR{A 5.397 AC. STOIWS A/IOU/ID iHE SYSTEM TH£ Fil TER CARTRIDGES
CARTRIDG[ D{S/GN now RA!£ 3D GF'M i!~f;,r.,;~;~;:i::J:T)OM_,,:%~°tJC::n~~-TRAflON , f!A'ffllTfR CARTRIDGES 2 (8AS£fJ ON MASS WADING)
ADS BA YFILTER DETAILS, PER ADVANCED DRAINAGE SYSTEMS, INC.
ROCKERY /,IAX/MlJ/J
HEIGHT 4-mr (TYP.
5££ DETAIL SHEU Cl~
6' CHAINUIIK FE/IC£
Pt/I ~OT SID. PiA
*RIP RAP PAD SPECIF/CATIONS
RIPRAP SHAH 8[ R{ASONABlY J\HL CRADEO l\1JH GRADATION AS
ff!LlOWSc
MAXIMUM STOii£ s,z£:
MtOiAN SfON{ SILE·
M!llli./Ul.< S fON< $!7F:
2'1 INCHES (NO/ill/AL {!J}U[Tt.~)
16 !//CHES
4 INC/1£5
RIPRAP Sil/NG G0',/[/11/[D BY SID[ Sl0P[S ON mm.ET C.'fANNEL JS
ASStJ!.'£D fO 8£ APPROX/MA TEL Y 3. I
___.B
@
NORTH
GRAPHIC SCALE L-~~.'~: :i: :-el 15 30 4,5
SWING/NG StCnoosi
D£TENnON POND PLAN VIEW
_!.L__
Call 2 Worki'lg Days Before You Dig
1-800-424-5555
Utilffieo Undergrouid Locatior, Cenlar
CID.t.IT.ND,OA,WA)
L. 1 INCll ~ 30 FT.
~ !l DR STRONG
[[ [O) [fQJ .~~~ ' ' • ---so.
W£1R CREST -
488.27
SECTION A-A
!HO R/W -
,oo
'"'
I Ci ..,· ..;; .. "'' s "1 L_
MOO
""
"" /
_'lQP_OF 6 • W/Of 8£RJ.J EJc._ 496.2~,,.------',...J
,oo -
' ~I
SECTION 8-8 MOO
OTY COI.IWOITS DATED JANUARY 10, 2013 V
"""' V
Pl.AN OfANGE 1 "" Pl.AN OfANGE: 2 V
REVISiQr,; "
6°° CHA/Ill.INK FENC[
''ft
ROCk[IIY MAXll.!UJ.I
'HfJCHT 4~£r -
_fX. CRA0£ _______ _
I 6" C/'iNNUNK FE~·IT I_ ,---~
-. ------------------------------"""' ·1·""'''"00 "'"
;"-.,
7.15" W£ SrDRAG£
_J"_;,
IO 5 SED!l.l[NT STOF/AC[ --1 -
PDJ,,D 801TOU [L!VATiON 4878~--------'--------------TOP OF SEO!l.<[N!.._~!2ft.G.£.£l_!_8,!!~----
,-
' ~1 s[ ij ~! ", I
Mm ""'
6' CHA/NL/NI( FDIC[
CONTROi. smucru.~r
Sff DtfA1l Sh'ffT ~J:f. ---
SECTION A-A
;j "I "' I
MO
el ~I
M"'
I;_X_ G!jA_2[
~I
>,OO
I
I
i
DESIGN ~5, El[VA l/ON 495 50 I
~
);\
C
~!
><m
,",)
GRAPHIC SCALE
' , "
~I ~-----1 --~ 1 INCH c 10FT
HORIZONTAL
2,s ;
1+40 t INCH m 5FT.
VERTICAL
----
-;,/J.
I
/ fi' Cl·/Al~UNI( FENCE:
-------
,--.
IIO(X[/IY J./AX/1.!UM
---_VHE1GHT~ta.,-
" I
,,
--------------------------------------------------r---------i ------. -----------------c:J
1.15· LI\£ SrDRAC£
18" Oi.JTI.U 1£ 488.:5;; 18" INLU •E 48./1.3~ l ;
I ~ '-/---------___ if),S S£0!J.1£NT STO!IACf ----------TOP OF S[D1MENT JTCRAC[ El 488]5
PO.~·o BOTTC!J f;!.f:VA l)qN 48! /,{, _
~I ~
M"
01.28.13 "" --··-··s.is
OJ.14.13 "" """"""'w..i 04.18.13 "" 04.29.1 "" ,,,.
"" DATF APr'f\ --,..,
I c' 'I ,~i4NB-B "I I "I J ,I 'I -1 ~ ~! ' '[ ~1 e -~ ' --~ sl ~ e "I ~
M<O M"' M"' >,OO
---_1t.:,';.;',;;.,,""'.,J.j'.",.,, AS NOTED ~ ~ Ci IY OF
RENTON
c,.c,..-"
Plonn:ng/Duildir,q/Put:lic Works De?l
""'"-'""""""'-'
><m 1+10 H60
RECOMMENDED FOR APPOVAL
BY: ___ _ _ Date: __ _
BY-Date: __ _
BY. Date: ---
BY ______ _ Date: __ _
SADDLEBROOK
DE!Ei'ITION POND DETAILS
11-14-12
;;:;:;;;;:;---
C13
13 "'11
AI-ININININIAIA
I
I
I
I '.LJ y::
:f 0 ~ 0
8 rr:
3 CJ
ii' w I ...J
0
0
<(
(/)
I
I
I
I
I
I
I
I
I
' '
I ~
5
r ~
! I 1
~
l
/
I i
!
i
i
5
SE 1/4 SE OF SECTION 32, TOWNSHIP 23N, RANGE 5£, W.M.
SADDLEBROOK
~ ~ :•!/!\~ I ·--'"'"'"'"'-'""-'"""""' "" [id-· .. -,~ ... , ..
--, ~;~"'""""'"''""' ,· • .. ~ /' ~~~~
~
,;_;.y''<
"-.J,' '· ' -:.-,/}-"
---/-
~;;~;:,,,1 I
~
'It' -~~~~:-nr.i::~,;.,,
~ISCTANOULAH Ao,usn.,EMT SECTION
L A""'°""'""'"'"="tv,,•~,t,,.,,,.,....,..,...,...,,REC ... CHASS sec110,. ,,,.~ (Ob"''""""'"'' lo ih, ,~,,,~• s,«111c>o,os)."'
'""'"'-"'"""i•m"'~"m'"""'""'""""'"'°''"'"'""'>II be um''"'""' ...i,,mum ""'""'' "'°'' , .• ,,.,, c,""' ALT••NA1we i~~J:a.sesec1,M. I\,~ """''"'""'""'"'P"a"'"'"'
, 1"•'"""'"''a,,,,,.,.,.,.,,,.,'"''""''""''"zr-· ""°"''""""'' ,,,.... o w,h.,lclm• .. ori-mlolertL•" le , ,. ~o,in<.•m. r,_, o 1.,·
-~0•00<,_0,..,,kT°"""''Mdl,,..-...,00,-.>iool<',eplO"
'""'"''~'~'""'"·""''"'""")>lo'""'''""""'°'".,.,. ~,-hSlaooanlSl"""""'o,.,..,:,_
:,_ it::r::~·m "'"'' ,~m 1" '"'"'"" , .. ,. ~ ~. '°""'' ~ ........
<. T>o .. ""' _. O~lo n;S h, in.,~..,"""'""' ,,..,,, """"
>. "~"••ca,1Sa,oSect°'~B>"'"''"""""'°""'•''""'"~""'mo, ... ~'""'""""'' ""'"''"'"·
,. "' ,,,,.,, ·"" ... ,,., ...... , .1 l'-o I'< ,,~. ,_,, ..... """""
'·"'"'"'"°"' .. ""''""""'""""~""'I"""""''"""''""' •. "'0-''~ •!no, a"'1 ''"I "l> ,h~I ,0 "'tin ,oor~,~ •=·~"= .oh """'"""""'"'"""'"-"'-
' =·-~·-' nt ·-J ,.:: -I [--~~ l' , .... c., :l ~ ,,,,.CP
l~._-1 ,i=t:
--~ ~
'''""~1~;;;;;-•:: ~:;~~ '-, ~~'~:~" 1
·l:~-"'"-"'"""
NOTES
, Nos<op.,,.,...:iuOodwno,,n,ign,;,,·or,.,.
,. The bes""" of 0,e pc.,st catcJ, b,,_., ""' t< <lof>"cl "''·""'1"1' "'-·~,~.,_
~ ra, "'"'"''"" "~"" ""'' ,,,,.. """1 "" '"'""'' "''~ ""'''""' """"'-, ,., ,~m, m•>"" "" ''"""' '"''-"""""' "'"""-
• ~"'~'"'''' ·'"'" m,e o """ !-icb,o,s of2' ""'""""' to, S-..,.,;m,n. Pm"'"' a 1.S"mlal..,.mgapbe...,.,n>h••••oeim,_.~alhML,o°"'i,:;,'111"P/>O· Afia<
"'"""'"'''"''"''"'·°"l',o<1Bps,11,JciaLn,;,'°r<1,ceord,"°"~ic,s1andard
""'"''"'"""9--04'-
"'-"'';:;;;.,."'&:'.:':~~~-_/-"''"
"~'-'""~,,·"''"',i;,zt:.:::,:::.. Al>.lUSTMENTS•CTl<lN r; '? 5-9i'i'53
THE CO\.CR OR GAATINSOF ~ CATCI< BASIN s~ALL NOT
BC 01'0U"TEOTO rlN/J. ~""'re UITTJC THE FINAL
ElE\.IA11CS 0' THS eAV'-MEITT.OlJrTCR. OITCH, 00
SIOEWfJ.K INWHCHJT rs T() ''-PL<ICEO 11/\S O[m
FSTSRO 'S>IEO, mo UITTIL """"'SS'ONTHE'aOJ"TERIS
GIVFN av n<E FNGl<ffR TO GROUTO~ OAAT"O'>G IN ;it,c,~ IN .u:coar,'"r.' "'"'" STAND= SOECIFIC,,TION
SHl~S Sf-\1\l.L ,m "" usrn ro s>T ""''" TO mv,cs. TUE USEC" SHIMS IS PROH!Silcl]
µo,,-r,,, Sfll,U ., PlACEOBETWECNAD.l!JSTh<>HT
RING$~NO OR,Cl<S ?RIC<>. TO i'".M:Er.,ENl
THC USC C.' O•SK:KS JS PSRMIITIDWHC~• l~S •RJcK.s
AJ!S a,a:SC,SRFO TO CRE~TE A RU,'N1HG BONO QR ~
"ONO.
AUERNATIVE PHC,.,.,. BU• SECTICN
L AJl~ra<o MOQ<, tu<co.>od casdno,<hal""'°''°""'"''" """""""'""'"
Stanoan,Sp,,Sfic.o<lco9-0<S !-.. -·-, ....... _..__,.,..,""-"'-"" <"'•~··"'"''" "''"'""-""' e PUIILlC WORKS
~IPARTl,l,'NT
CATCH BASIN TYPE 1 STD, PLAN -200.00
i" DIA!.IUER SMO(:,U-/
/URS f"OU,,J[Y SPJC["Q
(-!" 0.C. !./AX}
MARCH 2008
!~~5· (ITT') SU; NOT[: t
~~ ,..---P1A1~g(sfi:A%:i'A2"Il/6w
~ PUBL:C WORKS
-~~~--°'-'''-'ITT-Ml'KT J CATCH BASIN TYPE 2
FRAMF: & ROUND SOUD COVl::R
SID. PLAN -201.00
MARCH 2~0B e PllBL'.I: Wil:lXS
::Jl:?ARTMENT
CATCH BASIN INSTALLATION STD. PU..'< -202.DD
J.IARC:i 2003
PRO\ADE l,U1NTfNANC[ ACCESS
BY ltf:LDING 'I CROSS9ARS !Q -4
vfRTICAL BARS AS SHOWN.
HU/G[ UPPER ENDS ~TH F!.ANGES/
BO/. TS ANO PR0\1/0E LOCK/NG
J./ECHANJSJ./ (PAOWCK} CN
WWfR END.
"'""' ·,e,as" W/ '°"'"' eo, ,S~-
____ Rf'}_~ )-49WO __l
'1£W LOO. If S1£PS OIRECTl Y BELOW
' SI.IOOT/1
1-f"RnCAl 8A
LOlt£R 51£H BAND,;" X 4" ~DE
fDRJ.JFD m nr IN GROvf
OF C.8. RiSf:fl 2-<" SEE
NOTE I
UPPFR ST([[
BAND 1° X 1·
\\WE
--,M
CB R1eER
:I" D!A. SMOOTH RDWID BARS
wnorn £DUA!!. Y 5PAC£0
BARS SHAH 8[ 'M:lOEO TO
UPPER Ji WW[R SANDS
(24 BAI/OS EVfNLY SPACEO SIT NOTE 1)
,/)
FUD'G&CY O\UO ON £
WS FffV--4.~6.17 w
TOf OF r,.i[RG(N[r S1
ovrnncw~49597 ""
STANDARD
CA(VAN!ZEO
STEPS DR
UDD<R
~
,~um
SECTION A-A
HOOK CLAMP
ANCHO'<EO
70 CB RISER
DETAIL HOOK CLAMP
~
,. DIUEI/S!ONS ARE FDR 11.wsmA T!ON ON 54• DiAME !ER CB fOR Di'FlRENO DIAJ./UER CR'S ADJUST TO !.'AINTAI.\/ 45·
ANGLE ON "l;fR!!CAi" BA.~S AND 7" DC. MAXIMUM S/'AC/NG Of BARS A.~OUND LOWER SlffL DANO
,_ METAL PARIS MUST .9[ CORRCSIO,'I R[SIST}NT.· STffL BARS MtJST B[ GAlVA.'IIZEO
J, THIS DEBRIS BARR1[R IS ALSO RiXOUV[NOEO FOR /.IS[ 01/ THE !NifJ ID ROADWAY CRCSS· CULvfRTS !'lffH HIGH
POT[I/T!At FCR OE&RrS COLLECTION (EXCEPT ON TYPE 2 SrR£AVS)
~ THIS 0[8P.!S BARRI[.~ IS FOR US[ OUTSIDE OF ROAD RIGH{-0/-WAY CI/L~. FOil DEBR1S CAGES WfT/11.'I ROAO
RiG/IT-C/"-WAY. 5[[ DRA~M, 2-0W l<C.~S
BIRDCAGE EMERGENCY OVERFLOW
-~-
""
JA/U-/0US£
~NDOW. SEE----------
/J[JAIL. ffllS ---
SHffT
18" INif:T PiP£
1,~l,,[Rf = 488.15
~?'!JI,.
PfR PLANS -'-,--,'
SHEAR GAf[ W/ CON/ROI. RQIJ fOR
ClEANDUT f!RA/N (ROD BENT AS
REO'D FDR l,,[R/JCAL AL/GN!.llNI W/ .
COo,,[R) SEl KCRS QM,_ 53
CONTROL STRUCTURE
ClTY COllllENTS OATEO J,n,JAAY 10~ 2013
g" !./IN.
,e'or OUTtET f'lf'E
J[-'18835
DE';.JGN W S. -495 50
PIPC SUPPORTS
SEE NOTE 6
~4-1TU2-
0R1ncr -=2.54"
/;" f"IROW
1E -49JJO
ORIFICE e-2.1-4·
1.5 X DIA
18" OUT/.fT PIPE ,.~·,rnr • 1ea.x, 'rr---i-----LJ...--1 -PER PLA!,iS
I" SECMI/ OF PIPE ATTACHED SY
-CASKETfD BAND TO ALLOW R[!.IOVAL
C RFSTRICrGFI PIATf" W/ I n·e
ORIFICE SMOOTH EOG[
484 . .15
'"' '"' 03.1~.1~ MAJ "'""'"'~, ..
"'-18"~ !MIT PIPC
--...-.., FROU PO/ID
!E-488.1~
PIAN W[W
SG)lf 1· -2'-o·
= ), US£ A ViNIU'.JU OF A sr 0/AU[T[R TYP[ rwo CArCH BASIN.
2. OUTlfT CAPACITY· 100-YR 01::vE:1.Cl'CO P['A,< nr,,-
J METAL PARTS: COR/WS/0// RES/STA/IT. NON GALVANIZED PARTS
PREFERRED. CAL\."AI//ZEO Pif'C PARTS TO HA >'f" ASPHAlT TR[.Hl.f[NT
' 'I. FRAM[ ANO UDDER OR STfPS OF{S[T $0;
A, Cl[ANO,.,T GA T[ IS V/S!BLE f"ROAJ TOP.
e. C(IMB-DOMJ sPACf /$ CLEAR OF R1S£R AND CtEN•our CATE.
5 IF !./UAL OUTLET PIPE CDIINECTS TO CDJENT CONCRlJC PIPE:
am.ET PIPE ro HAI-£ S!.IOOirl 0.0. [OOAL TO CONCR[Tc P!Pt !.0.
LESS 1/4"
Ii. PR0,110[ A 1 LEAST 0/![ .1·x IJ90 (;A/)(;£ SUPPORT BR,CK[T
ANCHGRED Ta CONCRC7£ WALL. (UAXiJ./UM J' VERTICAL SPACING)
7. LOCA f£ ELBOW R£STRICTOR(S) AS N£CESSARY TO PROVIDE
UWJMU!.I C,EAIIANCE AS SHOJI?,/
""
CITY
,.:r~_ /;, "' ----~-1• ;...---------O>'<"'""g'"' 1--~~-
-·-
o,n,1. S,CTJON 0
I·"·· -•. I
1-~.,r~~~~,,·· .. --']-c f,;;'t°"' ! ~
I
I --
1/G
I.· /f)-f SJ -------1
! \...._;_./_, L, __ --ce::
i-·
::~~';;0
•. Tho;.,,.....-.,,yoflh, C""'''"''~"'~"''""""'""''a.'"d""""
"''""''"" Oh< oW,<ldlsLaaco le, ti-a ,aka Com. Se, SECTIOS ~-
_:~::;:;:'-,_./'
"'""''<""'""'"\ / .----./~
~:"""'""","'""""
~ TM<llm<cslonooi.-..rca,aoacd•loodmay,...,,lgeo,amoogd!C ,,,.,.,,w~nur,c1a,o."' Th,F,.,,.,.,,..,.,-,."""'"''"'·""''"''""1~1
""'""~•,,·,too<•·"' Hrn>.!O"'''""'"''"'''o"bd,oftlao
fame. T,-., rnathDds!o.-fa,,e~"""'" Ss!•ty Sor/Pete, ~u,"'".Dd
tot'>cH,od,,,,.,,,.,_ 1'•>!oodm"Jlr,.,a1,aeeo,c,9109,. Th•<,p
a'TheH,c,dmaeba"'"'"11h•?O••m
>. Arac.hlh•J-oc.-tather,,.,.,,,.o,,...,,,. .• ,., . .,h,_,,""'"·"""'
'·"'"''"''"~",~""· "'''"'"'''"'"''""'""°''""''"''""'""'' ""'''""'"""''""'"'""""'""~
e
~
Pl/KIC 11'0::lKS
DF:rARTIJENT
<.we,,a~..:l-g,al"'aro,poc:r;,.,1,lhoaa,Wad,p""1datwo
oole< la C,s •om• tia! oce '°"'"'V al,g...a .<,ht,.""'" ~"'''-
"""'"' ""'' tocrc,,plo ,,,. • • "1 NC• 2·.:,,,,.,.,,,,, =~~
:.OCS•llcmol""'·""""hale,,,..,,.,""""di!"e·antman.ffacfurera.
s .. e.ocr-POWNOETIJL
• o,~du<!IT<.-OOv,,...,u,.,,,.,-,.uc,ous.a
0. '"''""'-'"''""'~''""''=\..,ln,tallal<oado1a0sofomaa<ra<,
iuod """'"" 11 I,""' <he lnt.ncol ;., ;Ian 1o srow U., ,,,.c11,;;
a,tarr,,ece,,s,ytoflabrfc,IOthoc,<IJo,is,h<,-;.<,or,lhbd:....it,g.
OPEN CURB FACE
FRAME AND GRATE
INSTALLATION DETAIL
STD. PUN -203.00
l!lt:lCP. 2008
CIRCUMFERENCE lfl/CTH r-~--~~oOP:/1:i.t::.£05.~?f
ulll1ilf71 '"'°'" ' w,, S5 97
FRAME/GRAT[ FOR
SECONDARY IN.ET. Pi/OVIOE
',fR/ICAL BARS IN FRAU[
0 4 O.C. (OTHER FLOW
SYSTEMS ACCEPTABif If
APPROVfD IIY ODES} SE£
A(SO THE $£PARA 7£
OV[RflOW S!RUCT'JRE
SHOI\I\/ IN FIGURE 5 J.1.C
JAILHOUSE H1NDOW DETAIL
R£MOV.A5ff WA a[llr!GJIT
COUPLl!IIJ OR Fl.ANG£
I::)· I MM
Pl A!£ WE"L0£D TO ELBOW
111TH OR!hCE AS SPEC1F1£0
:...I_~
, I,
_]'
ELBOW RESTRJCTOR DETAIL
Of
Cal 2 Working D.o.~s Before You Dia
1-800-424-5555 [[ [) ~~·11 dstfr!tJ/;s:t.~ERS I : 1=~ .. , 1,., 1~,.,~ ~ r-s
ENGINEfiRS P!.,WNERS SUR\,9'Q;'S • PL..\N CHANGE 2 "<> ru. ~"' • ., •. , .,..... ~ n
1°1.2e.1JI MAJ 1 ·-.. ···SJs
;-;::, ~ '~~' 1 ..
I >S NOTED I ,.,~'/',\'.,~,%"'U't'«,,,
11 "~"·:m I I ~ ;R RC:N TON
SADDLEBROOK
STORM DRAINAGE DETAILS
l/t!ltie8 UnderlJl'"O<nd Loca~on Center
(D,MT.ND,Ofl.WA)
IOIIIUNE.»thPl.l!D1}(JRJ(U,NU,~96033'
0"25.IJU.9063 Fa:5.127.3123
--~alffl
·-
NO. I REVIS;ON "'
,-
= Plc,nn1ng/Buildinq/Pc1~lic \h'c,rks De;.,!
"'"-<"-==• =
N>S
""
11-14-12
C14
1-4 =,1
A[-[N[N[N[N[A[A
ADS Representative:
Date:
ISite Information
Proiect Name
Citv
State
Drainaee Area
lmoervious Area
Pervious Area
% lmoervious
I Upstream Detention System
Peak release rate from detention
Treatment release rate from detention
System Configuration
Detention pretreatment credit
IWA DOE Approval
BayFilter Sizing
Details
Saddlebrook
Seattle
WA
5.397
2.857
2.54
53%
0.432
0.o75
Offline
60%
I General Use Desi,nation I Ives
11-'A=eie~n~cv~,e~,a~u-ir~e~d~%~, ~,e~m~a~v-a-1---------tl 180%
I Filter System
Filtration Brand BayFilter
CartridRe Hei,ht 28
Cartridge Filter Area 43
Maximum Cartridge Flow Rate 0.7
Specific Flow Rate 30
Determine Critical Sizing Value
Number of Cartrid es Usin Flow Rate 2
!SUMMARY
Treatment Flow Rate 0.075
Cartride:e Flow Rate 30
Number of Cartridges 2
acres
acres
acres
cfs
cfs
i n
sf
gpm/sf
gpm
cfs
gpm
SECTIONV
CONVEYANCE SYSTEM ANALYSIS AND DESIGN
Per Core Requirement #4 of the KCSWDM, the conveyance system must be analyzed
and designed for existing tributary and developed onsite runoff from the proposed
project. Pipe systems shall be designed to convey the 100-year design storm. The
Rational Method was used to calculate the Q-Ratio for each pipe node.
A conveyance system consisting primarily of pipes and catch basins has been designed
for Saddlebrook Div. I and Div. II. Onsite runoff will be collected by the multiple catch
basins. Pipes are typically twelve-and eighteen-inch diameter LCPE material. The
pipes will have a minimum slope of 0.87%.
The pond primary overflow riser is designed to convey the 100-year peak storm (design
storm), based on the KCRTS 15-minute time series for developed, undetained
conditions on site. This is calculated at 4.65 cfs. The results of the 15-minute KCRTS
time series and KCBW Calculations are included in this Section.
DEVELOPED 15-MINUTE TIME SERIES
Modeling input
Land cover Entire
Site
Till forest (ac) 0.000
Till Grass (ac) 2.540
Wetland (ac) 0.000
Impervious (ac) 2.857
Scale Factor: 1.00
Time Step: 15-Min
Data Type: Reduced
Project location: Seatac
Total Area: 5.397
Table 5 Developed 15-Min KCRTS Modeling Input
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
30 Saddlebrook Div. II
Renton, Washington
Modeling results
Developed 15-Min
Flow Frequency Analysis
Time Series File:15-min-sea.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates---
Flow Rate Rank Time of Peak
(CFS)
1. 36 6 8/27/01 18:00
1. 01 8 1/05/02 15:00
3.13 2 12/08/0? 17:15
1.10 7 8/23/04 14:30
1. 96 4 11/17 /04 5:00
1. 69 5 10/27/05 10:45
1. 93 3 10/25/06 22: 45
4.65 1 1/09/08 6:30
Computed Peaks
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
-----Flow Frequency
--Peaks Rank
(CFS)
4.65 1
3.13 2
1. 96 3
1. 93 4
1. 69 5
1. 36 6
1.10 7
1. 01 8
4.15
31
Analysis-------
Return
Period
100.00
25.00
10.00
5.00
3.00
2.00
l. 30
1.10
50.00
Prob
0.990
0. 960
0.900
0.800
0. 667
0.500
0.231
0. 091
0.980
Saddlebrook Div. II
Renton, Washington
BACKWATER ANALYSIS
Storm Water Runoff Variables:
A= Tota! of Subasin and Tributary Areas
C= Runoff Coefficient {the anticipated proportion of rainfall volume that runs off the areal see 2009 KCSWM Table 3.2.1A
CC= Composite Runoff Coefficient
CC= S(Cn•An)IATotal
Tc= Time of Concentration (Typically 6.3 minutes which is the minimum value used in calculations)
R= design return frequency
iR= Unit peak rainfall intensity factor
iR= (aR)(Tc)A(-bR)
aR,bR= coefficients from '09 KCSWM Table 3.2.1.B used to adjust the equation for the desi_g_n storm
lR= Peak rainfall intensity factor for a storm of return frequency 'R'
IR= PWiR
PR= total precipitation (inches) for the 24-hour storm event for the given frequency. See lssopluvial Maps in 2009 KCSWM Figures 3.2.1.A w D
OR= peak flow (cfs) for a storm of return frequency 'R'
QR= CC*iR*A
The O~Ratio describes the ratio of the tributary flow to the main upstream flow.
R= iai'&oi -year storm
aR= 2.61
bR= 0.63
PR= RIBJi inches
Conveyance System Variables:
d= pipe diameter
n= Manning's Number
I= length of pipe
© 2013 D. R. STRONG Consulting Engineers lnc.
Technical Information Report
32 Saddlebrook Div. II
Renton, Washington
Pipe Structures Subasins & A A
Tributaries
FROM CB To CB Sf Ac
4 4 3 4 589 0.01
IRU~ 103-3
3
39482 0.91
2 3 36336 0.83
3 3 2 3 75818 1.74
RUN 102-2 21239 0.49
2 2 1 2 30748 0.71
2 2 2 51987 1.19
RUN 101-1 1006 0.02
RUN 703-1 81331 1.87
INLET 1 1 5477 0.13
INLET 1 1 67814 2.02
703 703 702 703 36095 0.83
702 702 701 702 4210 0.10
701 701 7 701 4217 0.10
7 7 5 7 735 0.02
5 5 1 5 36074 0.83
81331 1.87
101 101 1 101 1006 0.02
102 102 2 102 21239 0.49
103 103 3 103 39482 0.91
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
C cc Tc ;a IR QR SQR Q-
subasin Ratio
Ac Min. ct, els
CB#4 TO INLET 1
0.90 6.3 0.82 3.27 O.D4 0.04 0.00
0.63
I 0.61
0.62 6.3 0.82 3.27 3.54 3.58 88.91
0.58
0.57
0.58 6.3 0.82 3.27 2.25 5.83 0.63
0.90
0.59
0.90
0.61 6.3 0.82 3.27 4.06 9.89 0.70
CB#703 TO CB#1
0.51 6.3 0.82 3.27 1.36 1.38 0.00
0.90 6.3 0.82 3.27 0.28 1.66 0.21
0.90 6.3 0.82 3.27 0.29 1.95 0.17
0.90 6.3 0.82 3.27 0.05 2.00 0.03
0.60 6.3 0.82 3.27 1.62 3.62 0.81
0.59
CB#101 TO CB#1
0.90 6.3 0.82 3.27 0.07 0.07 0.00
CB#102 TO CB#2
0.58 6.3 0.82 3.27 0.93 0.93 0.00
CB#103 TO CB#3
0.63 6.3 0.82 3.27 1.88 1.88 0.00
33
d Material n I Slope invert invert
in °"'
in ft % ft ft
12 N-12 0.012 36 1.46 498.50 497.98
12 N-12 0.012 222 0.87 497.98 496.05
18 N-12 0.012 299 1.10 495.55 492.27
18 N-12 0.012 63 6.25 492.27 488.35
12 N-12 0.012 77 3.88 502.61 499.63
12 N-12 0.012 122 3.51 499.63 495.35
12 N-12 0.012 23 1.00 495.35 495.12
12 N-12 0.012 31 2.28 495.12 494.42
12 N-12 0.012 25 6.73 494.42 492.77
12 N-12 0.012 21 0.98 492.98 492.77
12 N-12 0.012 24 20.05 500.93 496.05
12 N-12 0.012 24 0.99 498.22 497.98
over-
flow
elev.
ft
501.50
501.22
505.93
499.73
507.61
502.63
498.50
498.12
499.42
497.86
505.93
501.22
Q V Bend
Full Full
Flow Flow
ct, fps
4.68 5.95 0
3.61 4.60 0.2
11.95 6.76 0.2
28.52 16.14 124.59
7.62 9.70 0
7.25 9.23 88.23
3.87 4.92 18.74
5.54 7.44 44.11
10.04 12.78 57.44
3.83 4.88 0
17.33 22.06 o
3.84 4.89 0
Saddlebrook Div. II
Renton, Washington
CB
Dia
2
2
4
4
2
2
2
2
2
2
2
2
BACKWATER ANALYSIS MAP
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
34 Saddlebrook Div. II
Renton, Washington
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
~
'<(
~
!fl ....
• II ' I L -, l I
32,622 S.F. L LOT 703
~~~ II' r--t J--.. -----h
-. J RO D 703 ,
_3. 3 5.. ---·~ ~+ -··
1 r----..1.-1::. ____ r ___ .]1-----t-----r----l-----T------,.J I •
ROAD 707
4,277 S.F.
~ JI
~
'<(
LOT 5
30,538 S.F. LOT 102
18,801 S.F.
~ ~ ~ L _____ ------!fl
,_ . ROAD 5 .. ROAD 702 ]
ROAD 7 ' .....,""""".-·~~-.• --.
1 5 536Sf~~-----··-·-.. ... . ~2,43!,~---
LOT 103
29,492 S.F.
CE~ .. 1+-----~----j
.. . L --"..~EOAQ 103Ll?1J ' ... ' .· ) 9JJgrrs:r. . -L . ~" . f
~
~
'<(
~ S::
~
7 35 S. F. ROAD 1 ROAD 2
-,-~~-~-~--=-~nr~ ~-J43T°ST~ =-r
ROAD 101 --.! 917 S.F. ~-~-3~:LYJ·~JL-~-~nJ,r--·-----.~=~
rt-----~-, .
i j
r1
i I
I 1
i ) I(,) . I I(
~
'
G
@
LOT 2
28,317 SF. LOT 3
29,539 S.F.
!
~
~
'<(
~ Sc
~
@
NOR.TH
GRAPHIC SCALE
0 30 60
1 INCH= 60 FT.
90
R: \2012\0\ 12010\3\Drawin~·s \Base\38#12010.dwg 5/3/2013 9: 55: 16 AM PDT
COPYRIGHT @ ::'GI 2, DR. S'RONG CONSULT. \IG ENGlt\'::ERS INC.
~ '" !:\! <!l
Ci
(!) (!)
is i1i ~~
0: <:
c; 8
:::::
s
cS
~
0
ffi Ll.j
6 Q
~
a..
:li
!!.l ~ .....
~
<(
fli i-;:
~ (j
~
~ i ! I ~
!t ti ~ ~ ~ ~ ~ I ~ ! ij ij
a' ~ ~ ~ . ei ~ ~ ~ ~ C ~ I
DRAFTW BY: YLP
DESIGNED BY: YI.P
PROJFCT FNG!NfER: MAJ
DA TE: 04_.Ja 13
PROJECT NO.: 130.JO
ORA WING: 1
SHffT: 1 OF 1 I
BACKWATER ANALYSIS RESULTS
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB#4 TO INLET 1.bwp
Surcharge condition at intermediate junctions
Tailwaler Elevation:494.51 feet
Discharge Range:0.985 to 9.89 Step of 0.985 [cfs]
Overflow Elevation:501.5 feet
Weir:NONE
Upstream Velocity:O. feet/sec
PIPE NO. 1: 62 LF -18"CP @
OVERFLOW-EL: 499.73
6.25% OUTLET: 488.35 INLET: 492.27 INTYP: 5
JUNC NO. 1: BEND: 90 DEG DIA/WIDTH: 4. 0 Q-RATIO: 0. 70
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN DO DE HWO HWI
*******************************************************************************
0.99 2. 2 6 494.53 * 0.012 0.38 0.20 6.16 6.16 2.25 2.26 0. 4 6
1. 97 2. 2 9 194.56 * 0.012 0.53 0.27 6.16 6.16 2.26 2. 2 9 0.69
2.95 2.36 494.63 * 0.012 0.66 0.33 6.16 6.16 2.28 2.36 0.89
3. 94 2. 45 4 94. 72 * 0.012 CJ. 7 6 0.38 6.16 6.16 2.32 2. 45 1. 08
1.93 2.57 494.84 * 0.012 0.86 0.43 6.16 6.16 2.36 2.57 1. 2 6
5. 91 2.72 4 94. 99 * 0.012 0.94 0.47 6.16 6.16 2.41 2.72 1.45
6.90 2.89 495.16 * 0.012 1. 02 0.51 6.16 6.16 2.47 2.89 1. 64
7.88 3. 09 495.36 * 0.012 l. 09 0.51 6.16 6.16 2.51 3.09 1. 83
8.87 3.31 195. 58 * 0.012 1.16 0.58 6.16 6.16 2. 62 3.31 2.06
9.85 3.56 4 95. 83 * 0.012 1.22 0.61 6.16 6.16 2. 71 3.56 2.32
10.84 3.84 496.11 * O.Oll 1.27 0. 65 6.16 6.16 2.81 3.84 2.61
PIPE NO. 2: 2 99 LF -18"CP @ 1.10% OUTLET: 492. 27 INLET: 495.55 INTYP: 5
JUNC NO. 2: OVERFLOlil-EL: 505.93 BEND: 0 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.63
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.58 0.37 495.92 * 0. OJ 2 0. 29 0.23 2.26 2.26 0. 2 9 ***** 0.37
1. 16 0.51 496.09 * 0.012 0.41 0.32 2. 2 9 2.29 0.41 ***·!;-}; 0.54
1. 74 0.66 496.21 * 0.012 0.50 0.39 2.36 2.36 0.50 ***** 0. 66
2.32 o.n 4 96. 32 * 0.012 0.58 0.45 2.45 2. 45 0.58 ***** 0.77
2.90 0.87 4 96. 42 * 0.012 0.65 0.51 2.57 2.57 0.65 ***** 0.87
3.49 0.95 496.50 * 0.012 0.72 0.56 2. 72 2.72 0.72 ***** 0.95
4.07 1. 03 496. 58 * 0.012 0.78 0.61 2.89 2.89 0.78 ***** 1. 03
4.65 1. 10 496. 65 * 0. 012 0.83 0.66 3.09 3.09 0.83 ***** 1. 10
5.23 1.1 7 496.72 * 0.012 0.89 0.70 3.31 3.31 0. 8 9 ·k·k*** l.U
5.81 1. 32 496.87 * 0.012 0.94 0. 74 3.56 3.56 1. 08 1. 32 1. 24
6.39 1. 53 497.08 * 0.012 0.98 0.79 3.84 3.84 1. 4 4 1. 53 1.30
PIPE NO. 3: 221 LF -12"CP @ 0.87% OUTLET: 4 96. 05 INLET: 497.98 INTYP: 5
JUNC NO. 3: OVERFLOW-EL: 501. 22 BEND: 0 DEG DIA/WIDTH: 2.0 Q-Rl\TIO: 88. 91
Q(CFS) HW(FT) HW ELEV. * N-FAC DC ON TW DO DE HWO HWI
*******************************************************************************
0.36 0.33 498.31 * 0.012 0.25 0.22 0.00 0.22 0.25 ***** 0.33
0. 71 0. 4 9 498.47 * 0.012 0.36 0.31 0.04 0.31 0.36 *·!d:** 0. 4 9
1.07 0.61 198.59 * 0.012 0.44 0.38 0.16 0.38 0.44 ***** 0.61
1. 43 0. 73 498.71 * 0.012 0.51 0.44 0. 2·1 0.44 0.51 ***** 0.73
1. "/8 0.85 498.83 * 0.012 0.57 0.50 0.37 0.50 0.57 ***** 0.85
2.14 o. 96 498.94 * 0.012 0.63 0.56 0.45 0.56 0.63 ***** 0. 96
2.50 1. 07 499.05 * 0.012 0.68 0.62 0.53 0.62 0.68 ****·k 1. O"/
2.85 1.19 199.17 * 0.012 0.73 0.68 0.60 0.68 0.73 ***** l. 19
3.21 1. 33 499.31 * 0.012 0.77 0.74 0. 6"/ 0.74 o.n ***** 1. 33
3.57 1. 4 9 499.47 * 0.012 0.81 0.82 0.82 0.82 0.82 1. 4 4 1. 49
3.92 1. 97 499.95 * 0.012 0.85 1. 00 1. 03 1. 03 1. 39 1. 97 1. 66
© 2013 D.R. STRONG Consulting Engineers Inc. 35 Saddlebrook Div. II
Technical Information Report Renton, Washington
PIPE NO. 4: 35 LF -l2 11 CP @ 1.46% OUTLET: 197.98 INLET: 498.50 INTYP: 5
Q(CFS) HW(l'T) HW ELEV. * N-FAC DC DN ?W DO DE HWO HWI
*******************************************************************************
0.00
0.01
0.01
0. 02
0.02
0.02
0.03
0.03
0.04
0.04
0.01
0.04
0.06
0.10
0.22
0.33
0.45
0.56
0.68
0.82
0.97
1. 4 6
498.54
498.56
498.60
498.72
498.83
498.95
499.06
499.18
4 99. 32
499.47
499.96
* 0.012
* 0.012
* 0.012
* 0.012
* 0.012
* 0.012
* 0.012
* 0.012
* 0.012
* 0.012
., 0.012
0.03
0.04
0.05
0.06
0.06
0.07
0.07
0.08
0.08
0.09
0.09
0.03
0.04
0.04
0.05
0.05
0.06
0.06
0.06
0.07
0. O"/
0.07
BACKWATER COMPUTER PROGRAM FOR PIPES
0.33
0.49
0.61
0.73
0.85
0. 96
1. 07
1. 19
1. 33
1. 49
1. 9"/
Pipe data from file:CB#703 TO CB#l.bwp
Surcharge condition at intermediate junctions
Tailwater EJ.evation:495.84 feet
0.33
0.49
0.61
0.73
0.85
0. 96
1. O"/
1.19
1. 33
1.49
1. 97
Discharge Range:l.38 to 3.62 Step of 0.224 [cfs]
Overflow Elevation:507.61 feet
Weir:NONE
Upslream Velocity:0. f~ct/scc
0.03
0.05
0.10
0.22
0.33
0.45
0.56
0.68
0.82
0.97
1. 4 6
0.04
0.06
0.10
0.22
0.33
0.45
0.56
0.68
0.82
0.97
1. 46
0.03
0.04
0.05
0.06
0.07
0.08
0.08
0.09
0.10
0.10
0.11
PIPE NO. 1: 24 LF -12"CP @
OVERFLOW-EL: 499.42
6.73% OUTLET: 492.77 INLET: 494.42 INTYP: 5
JUNC NO. 1: BEND: 57 DEG DIA/WIDTH: 2.0 Q-Rl\TIO: 0.81
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
1. 38
1. 60
1. 83
2.05
2.28
2.50
2.72
2.95
3.17
3.10
3. 62
1. 53
1. 56
1. 60
1. 65
1. 70
1. 7 6
1. 83
1. 90
1. 97
2.05
2.14
495.95
495.98
496.02
496.07
496.12
496.18
496. 2:)
496. 32
4 96. 39
496.47
4 96. 56
* 0.012
* 0.012
* 0.012
* 0.012
* 0. OJ?
* 0.012
* 0.012
* 0.012
* 0.012
* 0.012
' 0.012
0.50
0.54
0.58
0. 62
0. 65
0.68
0. 71
0.74
0.77
0.79
0.82
0.26
0 . ?. 8
0. 2 9
0.31
0.33
0.35
0.36
0.38
0.39
0. 41
0.42
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
3.07
1. 4 6
1. 4 6
1. 47
1. 4 9
1. 51
1. ~2
1. 54
1. 56
1. 59
l. 61
1. 64
1. 53
1. 56
1. 60
1. 65
1. 70
1. 7 6
1. 83
1. 90
1.97
2.05
2 .14
0.69
0.76
0.83
0.91
0. 98
1. 05
1.12
1. 20
1. 2 9
1. 39
1. 4 9
PIPE NO. 2: 30 LF -12''CP @
OVERF!,OW-EL: 4 98 .12
2.28% OUTLET: 494.42 INLET: 495.12 INTYP: 5
JUNC NO. 2: BEND: 44 D~G DIA/WlD'l'H: 2.0 Q-RATIO: 0.03
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0. 7 6
0.89
1. 01
1.13
1. 26
1.38
1. 50
1. 63
1.75
1. 88
2.00
0.87
0.90
0. 96
1. 01
1. 08
1.15
1.23
1. 31
1. 41
1.51
1. 61
495.99
4 96. 02
496.08
196 .13
4 96. 20
4 96. 27
4 96. 35
496.43
4 96. 53
496. 63
496. 73
' 0.012
* 0.012
' 0.012
* 0.012
* 0.012
* 0.012
* 0.012
* 0.012
* 0.012
* 0.01?.
* 0.012
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
0.37
0.40
0.43
0.45
0. 4 8
0.50
0.53
0.55
0.57
0.59
0.61
36
0.25
0.27
0.29
0.30
0.32
0.34
0.35
0.37
0.38
0.40
0. 41
1. 53
1. 56
1. 60
1. 65
1. 70
1. 76
1. 83
1.90
1. 97
2.05
?. .14
l. 53
1. 56
1.60
1. 65
1. ·10
1. 7 6
1. 83
1. 90
1. 97
2. 05
2 .14
0.85
0.88
0.93
0.98
1. 04
1.10
1.17
1. 25
1. 33
1. 42
1. 52
0.87
0.90
0. 96
1. 01
1. 08
1.15
1. 23
1. 31
1.11
1. 51
1. 61
0.49
0.53
0.57
0.61
0.65
0.68
0. 72
0.75
0.79
0.82
0.85
Saddlebrook Div. II
Renton, Washington
PIPE NO. 3: 23 LF -12"CP @ 1. 00% OUTLET: 4 95. J 2 INLET: 495.35 INTYP: 5
JUNC NO. 3: OVERFLOW-EL: 498.50 BEND: 18 DEG DIA/WIDTH: 2.0 Q-RATIO: 0 .17
Q(CFS) HW(FT) HW ELEV. * N-FAC DC ON TW DO DE HWO HWI
*******************************************************************************
0.74 0.68 496. 03 * 0.012 0.37 0.30 0.87 0.87 0. 64 0.68 0. 4 9
0.86 0.72 4 96. 07 * 0.012 0.39 0.33 0.90 0.90 0.68 0. 72 0.53
0.98 0.78 496.13 * 0.012 0.42 0.35 0. 96 0. 96 0.73 0.78 0.57
1.11 0.84 496.19 * 0.012 0.45 0.37 1. 01 1. 01 0.79 0.84 0.61
1.23 0. 92 496.27 * 0.012 0.47 0.39 1. 08 1. 08 0.87 0.92 0.65
1. 35 0.99 496.34 * 0.012 0.50 0.41 1.15 1. 15 0.94 0.99 0.68
1. 4 7 1. 08 4 96. 43 * 0.012 0.52 0.43 l. 23 1. 23 1. 03 1. 08 0.72
1.59 1. 18 4 96. 53 * 0.012 0.54 0.45 1. 31 1. 31 1.12 1.18 0.75
1. 71 1. 29 496.64 * 0.012 0.56 0.47 1. 41 1. 41 1.22 1. 29 0. 78
1. 83 1. 41 496.76 ., 0.012 0.58 0.49 1. 51 1. 51 1. 33 1. 41 0.81
1. 95 1. 53 496.88 * 0.012 0.60 0.51 1. 61 1.61 1. 44 1.53 0.85
PIPE, NO. 4: 121 LF -12"CP @ 3.51% OUTLET: 495.35 INLET: 499.63 INTYP: 5
JUNC NO. 4: OVERFLOW-EL: 502.63 BEND: 88 DEG DIA/WID'n: 2.0 Q-RATIO: 0.21
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.63 0.44 500.0/ * 0.012 0.31 0.21 0.68 0.68 0.34 ***** 0.44
0.74 0. 4 9 500.12 * 0.012 0.36 0.22 0.72 0. 72 0.36 ***** 0.49
0.84 0.53 500.16 * 0.012 0.39 0.24 0.78 0.78 0.39 ***** 0.53
0.94 0.56 500.19 * 0.012 0.41 0.25 0.84 0.84 0. 41 ***** 0.56
1. 05 0.60 500.23 * 0.012 0.44 0. 2 6 0. 92 0. 92 0.44 ***** 0.60
1.15 0.64 500. 27 * 0.012 0. 4 6 0.27 0.99 0.99 0. 4 6 ***** 0. 64
1. 25 0.67 500.30 * 0.012 0.48 0.29 1. 08 1. 08 0.48 ***** 0.67
1. 36 0.71 500.34 * 0.012 0.50 0.30 1.18 1.18 0.50 ***** 0.71
1. 4 6 0.75 500.38 * 0.012 0.52 0.31 1.29 1. 2 9 0.52 ***** 0.75
1. 56 0. 78 500.41 * 0.012 0.54 0.32 l. 4 l 1. 41 0.54 ***** 0.78
1.66 0.82 500.45 * 0.012 0.55 0.33 1. 53 1. 53 0.55 ***** 0.82
PIPE NO. 5: 76 LF -12"CP @ 3.88% OUTLET: 499.63 INLET: 502.61 INTYP: 5
Q(CFS) HW(FT) IIW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.53 0. 4 0 503.01 * 0.012
0.61 0.43 503.04 * 0.012
0.70 0.46 503.07 * 0.012
0. /8 0.50 503. 11 * 0.012
0.87 0.53 503.14 * 0.012
0.95 0.56 503.l"/ * 0.012
1. 04 0.59 503.7-0 * 0.012
1. 12 0.62 503.23 * 0.012
1.21 0.65 503.26 * 0.012
1. 2 9 0.68 503.29 * 0.012
1. 38 0.70 503.31 * 0.012
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
0.31
0.33
0.35
0.37
0. 4 0
0. 41
0.43
0.45
0.47
0.49
0. 50
37
0.18 0.44 0.44
0.20 0.19 0.49
0.21 0.53 0.53
0.22 0.56 0.56
0.23 0.60 0.60
0.24 0. 64 0.64
0.25 0.67 0.67
0. 2 6 0.71 0. 71
0.27 0.75 0.75
0.28 0.78 0. '/8
0.29 0.82 0.82
0.31
0.33
0.35
0.37
0.40
0.41
0.43
0.45
0.47
0. 4 9
0.50
****·k 0.40
***** 0.43
***** 0.46
***** 0.50
·k**** 0.53
***** 0.56
***** 0.59
***** 0. 62
***** 0.65
***** 0.68
***** 0.70
Sadd!ebrook Div. II
Renton, Washington
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB#lOl TO CB#l.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:495.84 feet
Discharge Range:0.07 to 0.07 Step of 0.07 [cfs]
Overflow Elevation:497.86 feet
Weir:NONE
Upstream Velocity:O. feet/sec
PIPE NO. 1: 21 LF -12"CP @ 0.98% OUTLET: 492.7'1 INLET: 492.98 INTYP: 5
Q(CFS) HW(FT) HW ELEV. ·k N-Fl\.C DC DN TW DO DE HWO HWI
*******************************************************************************
0.07 2. 87 495.85 * 0.012 0.11 0.10 3.07 3.07 2.87
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB#102 TO CB#2.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:496.87 feet
Di_scharge Range: 0. 93 to O. 93 Step of O. 93 [cfs I
Overflow Elevation:505.93 feet
Weir;NONE
Upstream Velocity:O. feet/sec
2.87 0 .14
PIPE NO. 1: 24 LF -12"CP @ 20.05% OUTLET: 496.05 INLE~: 500.93 INTYP: 5
Q(CFS) HW(FT) HW ELEV. * N-FAC DC ON TW DO DE HWO HWI
*******************************************************************************
0.93 0.47 501.40 * 0.012 0.41 0.16 0.82 0.82 0.41 ***** 0.47
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:CB#103 TO CB#3.bwp
Surcharge condition at intermediate j~nctions
Tailwater Elevation:499.47 feet
Discharge Range:1.88 to 1.88 Step of 1.88 [cfs]
Overflow Elevation:501.22 feet
Weir:NONE
Upstream Velocity:0. feet/sec
PIPE NO. 1: 24 LF -12"CP @ 0.99% OUTLET: 497.98 INLET: 498.22 INTYP: 5
Q(CFS) HW(F7) HW ELEV. * N-FAC DC ON TW DO DE HWO HWI
*******************************************************************************
1. 88 1. 4 4 499.66 * 0.012 0.59 0.50 1.49 1.49 1.31
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
38
l. 44 0.88
Saddlebrook Div. 11
Renton, Washington
SECTION VI
SPECIAL REPORTS AND STUDIES
The following report and studies have been provided with this submittal.
1. Geotechnical Engineering Study -Earth Solutions NW, LLC, August 21, 2012
2. Geotechnical Consult Saddlebrook Phase II -Earth Solutions NW, LLC, May 15,
2013
3. Tree Inspection Report-Greenforest, Inc., May 1, 2013
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
39 Saddlebrook Div. II
Renton, Washington
SECTION VII
OTHER PERMITS, VARIANCES AND ADJUSTMENTS
Approved Drainage Adjustment 2012-03 (Attached)
Approved ADS BayFilter Adjustment 2012-04 (Attached)
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
40 Saddlebrook Div. II
Renton, Washington
PUBLIC WORKS DEPARTMENT
MEMORANDUM
DATE: August 16, 2012
TO: Arneta Henninger, Plan Reviewer J '
FROM: {)2~-Ron Straka, Surface Water Utility Supervisor, x7248
STAFF CONTACT: Hebe Bernardo, Surface Water Utility Engineer, x7264
SUBJECT: Saddlcbrook Plat Adjustment 2012-03
The City of Renton Surface Water Utility has completed review of the adjustment
request for the Saddlebrook Plat in accordance with City adopted 2009 l(ing County
Surface Water Design Manual (KCSWDM) and City Amendments to the 2009 KCSWDM.
Our review of the information leads us to understand that the applicant's engineering is
requesting an adjustment from the 2009 King County Surface Water Design Manual to
core requirement #1 (section 1.2.1), Discharge at the Natural Location. Our review of
the information provided by the applicant engineer on August 13, 2012, provides the
following finding£:
1. The proposed project has not completed the process preliminary plat approval
or SEPA review.
2. The site is located in two existing parcels (3664500260 and 3664500251) with a
total area of 4.36 acers. Parcels are situated atop a ridge and discharges
runoff into two subbasins. Tributary Drainage Area {TOA) West is
approximately 1.78 acres and discharges to 156th Avenue SE while TOA East is
comprised of the remaining 2.58 acres and discharges to 158th Avenue SE.
The discharge elevation of TOA West is approximately six feet lower than that of
TDA East. These two flowpaths converge at a point approximately 3,000 feet
downstream of TOA West and 4,900 feet downstream of TOA East at the
corner of 155th Avenue SE and SE 144th Street (convergence point).
3. The proposal is to collect much of the runoff from the project site (4.35 acres)
and direct it to a single combined detention and water quality facility located iri
the west portion of the site. The allowed release would then discharge through
an existing conveyance system into the right-of-way of 156th Avenue SE where it
continues to go south and converges with TOA East. in SE 144th Street.
Jan Illian
Page2of4
August 16, 2012
4. No downstream analysis has been completed and submitted to the City for
review. However, a preliminary field recognizance of the downstream drainage
system was completed by the applicant and applicant's engineer. Findings were
discussed in the adjustment letter. Preliminary analysis demonstrated that the
downstream path from TDA West is mostly comprised of a constructed
conveyance system from the ·site to the convergence point. This conveyance
system is made up of grass and rock-lined ditches as well as culverts, pipes,
and catch basins.
5. King County drainage complaints in the area were reviewed and the basin
draining to the conveyance system was determined using King County
iMAP. This resource review revealed an overall basin size of approximately
73.5 acres and no relevant drainage complaints in the last 15 years
downstream of the Site.
6. To analyze the impact of the discharge rate, the King County Runoff Time
Series Software was used to examine the overall site in a forested condition,
TDA West's existing condition, and the 73.5 acre basin in a forested condition as
well as a full build-out condition (undetained, based on KCSWDM Table
3.2.2.0 for 4.0 DU/GA, 42% impervious). TDA West (in its existing condition)
generates approximately 0.29 cfs of runoff for the 100-year return interval.
T)1e total site, when analyzed for the forested condition, will generate
approximately 0.35 cfs of runoff for the 100-year return interval. The existing
conveyance system downstream of the proposed plat would receive a net
increase in runoff of 0.06 cfs, which is less than 0.1 cfs. The total drainage
basin currently generates 5,93 cfs and 23.59 cfs, for forested and build-out
conditions assuming no flow control, respectively.
Based on these understandings, findings, and per section 1.2.1 of the 2009 Surface
Water Design Manual as amended by the City, the adjustment to allow the diversion of
runoff to a single combined storm water flow control and water quality treatment facility
draining to SE 156th Avenue is approved with the following conditions:
1. A level one downstream analysis in accordance with section 1.2.1 of the 2009
KCSWDM as amended by the City shall be submitted to the City for review.
Based on this analysis, the City may require the completion ofa downstream
analysis and/or improvements to the downstream system.
H:\File Sys\SWP -Surface Water Projects\SWP-27 -Surface Water Projects (ClP)\27-3129 Renton Stormwater
Ma nu al\ADJ USTMENTS\2012\2012-3 Saddlebroo k.doc\H Bah
Jan Jllfan
Page 3 of4
August lG, 2012
2. The proposed combined detention and water quality treatment facility to be
constructed on the northwest corner of the site shall be designed as a level 3
flow control for the entire site in using the two basins as the existing (forested)
site conditions. The stormwater facility shall be designed in accordance with
section 1.2.3 of the 2009 KCSWDM.
3. Surface water discharg·e from the west basin is required to follow its existing
drainage course.
4. Water quality treatment in accordance with section 1.2.8 of the 2009 KCSWDM
shall be provided for all targe.ted surfaces prior to discharging from th.e site. The
water qualityfacility shall be sized based on the entire proposed subdivision
draining to the facility including any required frontage improvements.
5. The release rate from the detention facility will be based on all of the tributary
area being directed to the facility.
5. The vo.lume of the stormwater detention facility shall be based on all flows
directed to the facility at full development under current zoning. The detention
volume shall be sized using Level 3 Flood Problem Flow Control Standards in the
2009 KCSWDM. The pre-developed condition runoff rates for the sizing of the
facility shall be based on the entire site using forested as pre-developed site
conditions. The TIR shall include all required document~tion detailed in chapter
2 of the 2009 KCSWDM for the sizing of the facility.
7. Additional storm drainage requirements identified by the City of Renton as part
of the SEPA review process or preliminary plat approval may apply to this
project. Please note that the approval of this adjustment does not relieve the
applicant from other conditions that may be stipulated in future city, state, or
federal permits/requirements.
Notes to applicant:
1. All lots within the Saddlebrook Plat are required to provide flow control BMPs in
accordance with figure C.1.3.A of the 2009 KCSWDM. Flow control BMP credits
in accordance with section 1.2.3 of the 2005 KCSWDM may be used to reduce
the size of the required flow control facility. The feasibility to implement full
· dispersion BMPs and full infiltration BMPs shall be verified first. If
implementation of full dispersion BMPs and full infiltration BMPS are not
feasible alternatives, then any of.the BMPs listed in figure C.1.3.A shall be
provided. The selected flow control BMP to be implemented on each lot shall be
shown on the co.nstruction plans. Drainage calculations for the sizing of the
proposed BMPs to be constructed on each lot shall be included in the TIR.
H:\File Sys\SWP-Surface Water Projects\SWP-27 -Surface Water Projects {CIP)\27-3129 Renton Stormwater
Manual\ADJUSTMENTS\2012\2012-3 Saddlebrook.doc\HBah
Jan Illian
Page4of4
August 16, 2012
Construction of the proposed flow control BMPs may be differed for
construction on the lot at time of building permit.
If you have any questions about this adjustment, please contact Hebe Bernardo or me.
Attachments
cc: Lys Hornsby, P.E., Utility Systems Director
Kayren Kit:t:ri_ck, Development Engineering Supervisor
Vanessa Dolbee, Planner
File
H:\File Sys\SWP -Surface Water Projects\SWP-27 -Sutface Water Projects {CIP)\27-3129 Renton Stormwater
Ma nual\ADJ USTMENTS\2012\2012·3 Saddlebrook.doc\H Bah
PUBLIC WORKS DEPARTMENT
M E M O R A N D U M
DATE: October 31, 2012
TO: Arneta Henninger, Plan Reviewer
FROM: Ron Straka, Surface Water Utiiity Supervisor, x7248
STAFF CONTACT: Hebe C. Bernardo, Surface Water Utility Engineer, x7248
Saddlebrook Plat-ADS Bay Filter™ Adjustment 2012-04 SUBJECT:
The City of Renton Surface Water Utility has completed review of the adjustment request from.
DR Strong Consultant Engineer for the Saddlebrook Plat in accordance with City adopted 2009
King County.Surface Water Design Manual (KCSWDM) and City Amendments to the 2009
KCSWDM. Our review of the information leads us to understand that the applicant's
engineering is requesting an adjustment from the 2009 King County Surface Water Design
Manual.to core requirement #8), Water Quality. Our review of the information provided by the
applicant engineer on October 16, 2012, provides the following findings:
1. The proposed project has not completed the process preliminary plat approval or SEPA
review.
2. The site is located in two existing parcels (3664500260 and 3664500261) with a total
ar~a of4.36 acres. Paree ts are situated atop a ridge and discharges runoff into two
sub-basins. An adjustment to Core Requirement 111, Discharge at the Natural Location
was approved in December 11, 2012 allowing the project to collect much of the runoff
from the project site (4.36 acres) and direct it to a single combined detention and water
quality facility located in the west portion of the site.
The adjustment request proposes to use the BayFilter'" System for Basic Water Quality
treatment. The Washington State Department of Ecology has approved the BayFilter'" System
for General Use Level Designation for Basic Water Quality treatment.
Based on the information provided in the adjustment request; the BayFilter'" System for Basic
Water Quality Treatment is approved with the following conditions:
1. _The water quality design flow shall be as follows, whichever is applicable:
a. Downstream offlow control facility: The full 2-year pre-developed allowable
rate release rate from the flow control facility.
Ms. Henninger
Page2of3
October 31, 2012
2. The Storm Filter system shall be sized as described in the BayFilter™ Technical and
Design Manual, and the designer shall select the result yielding the larger number of
cartridges.
3. Pre-settling shall be provided per Section 6.5.1 of the 2009 KCSWDM, General
Requirements for Media Filtration Facilities.
4. BayFilter'M systems shall be installed in such a manner that the flows exceeding the
design flow rates are bypassed around the Bayfilter Water Quality treatment facility. An
external bypass to handle flow exceeding the facility design shall be provided.
5. The following maximum flow rates per cartridge system is limited to the following:
a. BayFilterCartridge (BFC) Cartridge maximum flow rate of0.7 gpm/sf.
i. 30 gpm (0.067 cfs) per cartridge (43 sf filter area).
ii. 26 inches in diameter and approximately 28.75 inches tall.
6. Media combinations for the BayFilter'" cartridges are limited to Silica Sand, Perlite,
Zeolite, and Activated Alumina. All filters are limited to the 19" vertical component to
the spiral filter layers.
7. Vaults used for the BayFilter™ System shall conform to the "Materials" and "Structural
Stability" requirements specified in Section 5.3.3 of the 2009 KCWDM for detention
vaults.
8. The BayFilter'" system must be installed in an area that is accessible to maintenance
equipment. The maintenance of a BayFilter'" system requires a vacuum truck as well as
the removal and replacement of the filter cartridges. The manhole covers, and/or
access hatches of the BayFilter'" System must be placed in locations that can be easily
reached by such a vehicle.
9. Access Requirements:
a. Access consistent with City confined entry policy must be provided by either
removable panels or other City approved accesses to allow for removal and
· replacement of the BayFilter cartridges. Approved access details for the Storm
Filter system may be used as example and are available in Reference Section 7C
of the 2009 KCSWDM.
b. Removable panels, if used, shall be at grade, have stainless steel lifting eyes, and
weigh no more than 5 tons per panel.
c. Access to the inflow and outlet cells must also be provided.
d. Ladder access is required whe·n vault height exceeds 4 feet.
e. Structures and access covers shall be designed for HS20 traffic loading.
f. Removable panel access for vault shall not be located within the street
pavement section.
10. !nstailation of a 8ayFilter™ system shall follow the manufacturer 1s recommended
procedures.
H:\File Sys\SWP -Surface Watt:r Projects\SWP-27 -Surface VJater Projects. (CIP)\27-3129 Renton Stormwater
Manua!\ADJUSTMENTS\2012\2012-4 Sattlebrook Plat-bayfi!ter.doc\H82h
Ms. Henninger
Page3of3
October 31, 2012
11. The Bay Filter'" system shall be inspected every six (6) months during the 2-year
maintenance defect bond period following completion of construction and plat
recording .. The owner is responsible for the_ maintenance of the Bay Filter'" system
during the 2-year defect bod period. The City will maintain the facility after the two
year maintenance and defect bond period expires.
12. When Bay Filter exhibits flows below design levels, the system should be inspected and
maintained as soon as practical. Replacing a Bay Filter cartridge should be considered at
or above the level of the 4" collector pipes to the manifold. Maintenance procedures
can be found in the BayFilter System Technical and Design Manual. The maintenance
process comprises the removal and replacement of each BayFilter cartridge and the
cleaning of the vault or manhole with a vacuum truck.
13. This is a conceptual approval for using the Bay Filter for Basic Water Quality Treatment.
Further analysis and design calculations shall be included in the TIR for final approval.
14. The approval of this adjustment to use the BayFHter System for the Saddle brook Plat
does not authorize the use of the BayFilter System on future projects without prior
approval from the City of Renton.
15.-The BayFilter system shall be installed in accordance with the approved drawings and
shall not be located within City right-of-way or easements.
Please note that the approval of this adjustment does not relieve the applicant from other city,
state, or federal requirements. If you have any questions about this adjustment, please contact
Hebe C. Bernardo or me.
Attachments
cc: Lys Hornsby1 P.E., Utiiity Systems Director
Kayren Kittrick, Development Engineering Supervisor
Richard Marsha!, Surface Water and Water Maintenance Manager
Vanessa Dolbee, Planner
File
H:\File Sys\SWP-Surface Weiter Projects\SWP-27-Surface Water Projects (CIPj\27-3129 Renton Stormwater
Mein ual\A DJUSTMENTS\2012\2012-4 Sattlebrook Plat-bayfi!ter.doc\HBah
SECTION VIII
ESC PLAN ANALYSIS AND DESIGN (PART A)
The Erosion and Sedimentation Control Design will meet the nine minimum
requirements:
1. Clearing Limits -Areas to remain undisturbed shall be delineated with a high
visibility plastic fence prior to any site clearing or grading.
2. Cover Measures -Site disturbed areas shall be covered with mulch and
seeded, as appropriate, for temporary or permanent measures.
3. Perimeter Protection -Perimeter protection shall consist of a silt fence down
slope of any disturbed areas or stockpiles.
4. Traffic Area Stabilization -A stabilized construction entrance will be located at
the point of ingress/egress.
5. Sediment Retention -The proposed detention pond will be used as a sediment
pond.
6. Surface Water Control -Surface water control will be provided by interceptor
swales.
7. Dewatering Control -Not Applicable to this Site.
8. Dust Control -Dust control shall be provided by spraying exposed soils with
water until wet. This is required when exposed soils are dry to the point that
wind transport is possible which would impact roadways, drainage ways,
surface waters, or neighboring residences.
9. Flow Control -Flow control will be provided by the detention pond.
SWPPS PLAN DESIGN (PART B)
Construction activities that could contribute pollutants to surface and storm water
include the following, with applicable BMP's listed for each item:
1. Storage and use of chemicals: Utilize source control, and soil erosion and
sedimentation control practices, such as using only recommended amounts of
chemical materials applied in the proper manner; neutralizing concrete wash
water, and disposing of excess concrete material only in areas prepared for
concrete placement, or return to batch plant; disposing of wash-up waters from
water-based paints in sanitary sewer; disposing of wastes from oil-based paints,
solvents, thinners, and mineral spirits only through a licensed waste
management firm, or treatment, storage, and disposal (TSO) facility.
2. Material delivery and storage: Locate temporary storage areas away from
vehicular traffic, near the construction entrance, and away from storm drains.
Material Safety Data Sheets (MSDS) should be supplied for all materials stored,
and chemicals kept in their original labeled containers. Maintenance, fueling,
and repair of heavy equipment and vehicles shall be conducted using spill
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
41 Saddlebrook Div. II
Renton, Washington
prevention and control measures. Contaminated surfaces shall be cleaned
immediately following any spill incident. Provide cover, containment, and
protection from vandalism for all chemicals, liquid products, petroleum products,
and other potentially hazardous materials.
3. Building demolition: Protect stormwater drainage system from sediment-laden
runoff and loose particles. To the extent possible, use dikes, berms, or other
methods to protect overland discharge paths from runoff. Street gutter,
sidewalks, driveways, and other paved surfaces in the immediate area of
demolition must be swept daily to collect and properly dispose of loose debris
and garbage. Spray the minimum amount of water to help control windblown
fine particles such as concrete, dust, and paint chips. Avoid excessive spraying
so that runoff from the site does not occur, yet dust control is achieved. Oils
must never be used for dust control.
4. Sawcutting: Slurry and cuttings shall be vacuumed during the activity to prevent
migration offsite and must not remain on permanent concrete or asphalt paving
overnight. Collected slurry and cuttings shall be disposed of in a manner that
does not violate ground water or surface water quality standards.
The complete CSWPPP will be provided prior to final engineering approval.
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
42 Saddlebrook Div. II
Renton, Washington
SECTION IX
BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT
1. Bond Quantity Worksheet -will be provided prior to final engineering approval.
2. Facility Summary-attached.
3. Declaration of Covenant -will be provided prior to final engineering approval.
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
43 Sadd!ebrook Div. II
Renton, Washington
STORMWATER FACILITY SUMMARY SHEET
Development Saddlebrook Div. I and Div. II Date April 30, 2013
Location 13422 1561h Avenue SE, Renton, Washington
ENGINEER DEVELOPER
Name Maher A. Joudi, P.E. Name
Firm D. R. STRONG Consulting Firm: ACH Homes, LLC
Engineers, Inc.
Address 10604 NE 38'" Place, #232 Address 9675 SE 36'" Street,# 105
Kirkland, WA 98033 Mercer Island, WA 98040
Phone (425) 827-3063 Phone (206) 588-1147
Developed Site: 5.54 acres
Number of lots Seventeen (Total for Div. I and Div. Ill
Number of detention facilities on site:
_ _,1'--pond
vaults ---tanks ---
Number of infiltration facilities on site:
ponds ---
vaults ---
tanks ---Flow control provided in regional facility (give
location) ______________ _
No flow control required __ Exemption number
D ownstream D . ra1naqe B . as1ns
Immediate Major Basin
Basin Lower Cedar River Cedar River
Number & type of water quality facilities on site:
___ biofiltration swale (regular/weU or continuous inflow?)
___ sand filter (basic or large?)
large?)
1 detention pond
___ combined detention/wetvault
___ compost filter
___ filter strip
34 flow dispersion
___ farm management plan
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
---sand filter, linear (basic or
1 BayFilter
___ sand filter vault (basic or large?)
stormwater wetland ---
---wetpond (basic or large?)
wetvault ---
___ pre-settling pond
---flow-splitter catchbasin
44 Saddlebrook Div. II
Renton, Washington
___ landscape management plan
___ oil/water separator (baffle or coalescing plate?)
catch basin inserts: ---
Manufacturer ---------------------
--,----pre-settling structure:
Manufacturer ___________________ _
DESIGN INFORMATION
Water Quality design flow
Water Quality treated volume
Drainaoe basin(s)
Onsite area (inlcudes frontage)
Offsite area
Type of Storage Facility
Live Storaoe Volume (required)
Predev Runoff Rate
Developed Runoff Rate
(Including Bypass Rate)
Type of Restrictor
Size of orifice/restriction
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
2-year
10-year
100-vear
2-year
10-year
100-year
No. 1
No. 2
No. 3
No. 4
INDIVIDUAL BASIN
East
2
5.54 ac.
0
Pond
62,868
0.154
0.268
0.447
0.083
0.228
0.444
Froo-Tee
1.11
2.14
2.54
N/A
45 Saddlebrook Div. II
Renton, Washington
SECTION X
OPERATIONS AND MAINTENANCE MANUAL
See Appendix C for excerpts from the 2009 King County Surface Water Design Manual
with regard to Operations and Maintenance.
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
46 Saddlebrook Div. II
Renton, Washington
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
APPENDICES
47 Saddlebrook Div. II
Renton, Washington
APPENDIX "A" LEGAL DESCRIPTION
THE SOUTH 130 FEET OF LOT 5 IN BLOCK 2 OF JANETT'S RENTON BOULEVARD
TRACTS, ACCORDING TO PLAT RECORDED IN VOLUME 17 OF PLATS AT
PAGE(S) 60, IN KING COUNTY, WASHINGTON; EXCEPT THE EAST 290 FEET
THEREOF.
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
48 Saddlebrook Div. II
Renton, Washington
APPENDIX "B" BOND QUANTITY WORKSHEET
This will be provided during final engineering.
© 2013 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
49 Saddlebrook Div. II
Renton, Washington
APPENDIX "C" OPERATIONS AND MAINTENACE MANUAL
© 2013 0. R. STRONG Consulting Engineers Inc.
Technical Information Report
50 Saddlebrook Div. ll
Renton, Washington
APPENDIX A MAINTENANCE REQUJREMENTS PLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 1 -DETENTION PONDS
Maintenance Defect or Problem Conditions When Maintenance Is Needed Results Expected When
Component Maintenance Is Performed
Site Trash and debris Any trash and debris which exceed 1 cubic foot Trash and debris cleared from site.
per 1,000 square feet (this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oll film.
Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a
height. height no greater than 6 inches.
Top or Side Slopes Rodent holes Any evidence of rodent holes if facility is acting Rodents removed or destroyed and
of Dam, Berm or as a dam or berm, or any evidence of water dam or berm repaired.
Embankment piping through dam or berm via rodent holes.
Tree growth Tree growth threatens integrity of slopes, does Trees do not hinder facility
not allow maintenance access, or interferes with performance or maintenance
maintenance activity. If trees are not a threat or activities.
not interfering with access or maintenance, they
do not need to be removed.
Erosion Eroded damage over 2 inches deep where cause Slopes stabilized using appropriate
of damage is still present or where there is erosion control measures. If erosion
potential for continued erosion. Any erosion is occurring on compacted slope, a
observed on a compacted slope. licensed civil engineer should be
consulted to resolve source of
erosion.
Settlement Any part of a dam, berm or embankment that has Top or side slope restored to design
settled 4 inches lower than the design elevation. dimensions. If settlement is
significant, a licensed civil engineer
should be consulted to determine
the cause of the settlement.
Storage Area Sediment Accumulated sediment that exceeds 10% of the Sediment cleaned out to designed
accumulation designed pond depth. pond shape and depth; pond
reseeded if necessary to control
erosion.
Liner damaged Liner is visible or pond does not hold water as Liner repaired or replaced.
(If Applicable) designed.
Inlet/Outlet Pipe. Sediment Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inleUoutlet No trash or debris in pipes.
pipes (includes floatables and non-floatab!es).
Damaged Cracks wider than %-inch at the joint of the No cracks more than X-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
Emergency Tree growth Tree growth impedes flow or threatens stability of Trees removed.
Overflow/Spillway spillway.
Rock missing Only one layer of rock exists above native soil in Spillway restored to design
area five square feet or larger or any exposure of standards.
native soil on the spillway.
1/9/2009 2009 Surface Water Design Manual -Appendix A
A-2
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 4 -CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Structure Trash and debris Trash or debris of more than% cubic foot which No Trash or debris blocking or
is located immediate!y in front of the structure potentially blocking entrance to
opening or is blocking capacity of the structure by structure.
more than 10%.
Trash or debris in the structure that exceeds 1
/3 No trash or debris in the structure.
the depth from the bottom of basin to invert the
lowest pipe into or out of the basin.
Deposits of garbage exceeding 1 cubic foot in No condition present which would
volume. attract or support the breeding of
insects or rodents.
Sediment Sediment exceeds 60% of the depth from the Sump of structure contains no
bottom of the structure to the invert of the !owe st sediment.
pipe into or out of the structure or the bottom of
the FROP-T section or is within 6 inches of the
invert of the lowest pipe into or out of the
structure or the bottom of the FROP-T section.
Damage to frame Corner of frame extends more than % inch past Frame is even with curb.
and/or top slab curb face into the street (If applicable).
Top slab has holes larger than 2 square inches or Top slab is free of holes and cracks.
cracks wider than Y.t inch.
Frame not sitting flush on top slab, i.e., Frame is sitting flush on top s!ab.
separation of more than % inch of the frame from
the top slab.
Cracks in walls or Cracks wider than % inch and longer than 3 feet, Structure is sealed and structurally
bottom any evidence of soil particles entering structure sound.
through cracks, or maintenance person judges
that structure Is unsound.
Cracks wider than Yz inch and longer than 1 foot No cracks more than 1h inch wide at
at the joint of any inlet/outlet pipe or any evidence the joint of inleUout!et pipe.
of soil particles entering structure through cracks.
SettlerrienU Structure has settled more than 1 inch or has Basin replaced or repaired to design
misalignment rotated more than 2 inches out of alignment. standards.
Damaged pipe joints Cracks wider than %-inch at the joint of the No cracks more than X.-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of inlet/outlet pipes.
the structure at the joint of the inlet/outlet pipes.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Ladder rungs missing Ladder is unsafe due to missing rungs, Ladder meets design standards and
or unsafe misalignment, rust, cracks, or sharp edges. allows maintenance person safe
access.
FROP-T Section Damage T section is not securely attached to structure T section securely attached to wall
wall and outlet pipe structure should support at and outlet pipe.
least 1,000 lbs of up or down pressure.
Structure is not in upright position (allow up to Structure in correct position.
10% from plumb).
Connections to outlet pipe are not watertight or Connections to outlet pipe are water
show signs of deteriorated grout. tight; structure repaired or replaced
and works as designed.
Any holes-other than designed holes-in the Structure has no holes other than
structure. designed holes.
Cleanout Gate Damaged or missing Cleanout gate is missing. Replace cleanout gate.
2009 Surface Water Design Manual-Appendix A 1/9/2009
A-7
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 4 -CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Cleanout gate is not watertight. Gate is watertight and works as
designed.
Gate cannot be moved up and down by one Gale moves up and down easily and
maintenance person. is watertight.
Chain/rod leading to gate is missing or damaged. Chain is in place and works as
designed.
Orifice Plate Damaged or missing Control device is not working properly due to Plate is in place and works as
missing, out of place, or bent orifice plate. designed.
Obstructions Any trash, debris, sediment, or vegetation P!ate is free of all obstructions and
blocking the plate. works as designed.
Overflow Pipe Obstructions Any trash or debris blocking {or having the Pipe is free of all obstructions and
potential of blocking) the overflow pipe. works as designed.
Deformed or damaged Lip of overflow pipe is bent or deformed. Overflow pipe does not allow
lip overflow at an elevation lower than
design
lnleVOutlet Pipe Sediment Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes.
pipes {includes floatables and non-floatables).
Damaged Cracks wider than Yz-inch at the joint of the No cracks more than Xi-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inleUoutlet pipes.
Metal Grates Unsafe grate opening Grate with opening wider than 7
/8 inch. Grate opening meets design
(If Applicable) standards.
Trash and debris Trash and debris that is blocking more than 20% Grate free of trash and debris.
of grate surface. footnote to guidelines for disposal
Damaged or missing Grate missing or broken member(s) of the grate. Grate is in place and meets design
standards.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place. Cover/lid protects opening to
Any open structure requires urgent structure.
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
Not Working maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and
Remove cover/lid after applying 80 !bs. of lift. reinstalled by one maintenance
person.
1/9/2009 2009 Surface Water Design Manual-Appendix A
A-8
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 5 -CATCH BASINS AND MANHOLES
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Structure Sediment Sediment exceeds 60% of the depth from the Sump of catch basin contains no
bottom of the catch basin to the invert of the sediment.
lowest pipe into or out of the catch basin or is
within 6 inches of the invert of the !owe st pipe
into or out of the catch basin.
Trash and debris Trash or debris of more than% cubic foot which No Trash or debris blocking or
is located immediately in front of the catch basin potentially blocking entrance to
opening oris blocking capacity of the catch basin catch basin.
by more than 10%.
Trash or debris in the catch basin that exceeds No trash or debris in the catch basin.
1
/3 the depth from the bottom of basin to invert the
lowest pipe into or out of the basin.
Dead animals or vegetation that could generate No dead animals or vegetation
odors that could cause complaints or dangerous present within catch basin.
gases (e.g., methane).
Deposits of garbage exceeding 1 cubic foot in No condition present which would
volume. attract or support the breeding of
insects or rodents.
Damage to frame Corner of frame extends more than % inch past Frame is even with curb.
and/or top slab curb face into the street (lf applicable).
Top slab has holes larger than 2 square inches or Top s!ab is free of holes and cracks.
cracks wider than X inch.
Frame not sitting flush on top slab, i.e., Frame is sitting flush on top slab.
separation of more than % inch of the frame from
the top slab.
Cracks in walls or Cracks wider than % inch and longer than 3 feet. Catch basin is sealed and
bottom any evidence of soil particles entering catch structurally sound.
basin through cracks, or maintenance person
judges that catch basin is unsound.
Cracks wider than % inch and longer than 1 foot No cracks more than 1
/4 inch wide at
at the joint of any inleVoutlet pipe or any evidence the joint of inleVoutlet pipe.
of soil particles entering catch basin through
cracks.
Settlement! Catch basin has settled more than 1 inch or has Basin replaced or repaired to design
misalignment . rotated more than 2 inches out of alignment. standards.
Damaged pipe joints Cracks wider than X-inch at the joint of the No cracks more than /'4-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of inleVout!et pipes.
the catch basin at the joint of the inleUoutlet
pipes.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil fi!m.
lnleVOutlet Pipe Sediment Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inleVoutlet No trash or debris in pipes.
pipes (includes floatables and non-floatab!es).
Damaged Cracks wider than Yz-inch at the joint of the No cracks more than %-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
2009 Surface Water Design Manual -Appendix A 1/9/2009
A-9
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 5 -CATCH BASINS AND MANHOLES
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Metal Grates Unsafe grate opening Grate with opening wider than 7
/8 inch. Grate opening meets design
(Catch Basins) standards.
Trash and debris Trash and debris that is blocking more than 20% Grate free of trash and debris.
of grate surface. footnote to guidelines for disposal
Damaged or missing Grate missing or broken member(s) of the grate. Grate is in place and meets design
Any open structure requires urgent standards.
maintenance.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place. Cover/lid protects opening to
Any open structure requires urgent structure.
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
Not Working maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficu·lt to One maintenance person cannot remove Cover/lid can be removed and
Remove cover/lid after applying 80 lbs. of lift. reinstalled by one maintenance
person.
1/9/2009 2009 Surface Water Design Manual-Appendix A
A-10
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 6 -CONVEYANCE PIPES AND DITCHES
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Pipes Sediment & debris Accumulated sediment or debris that exceeds Water flows freely through pipes.
accumulation 20% of the diameter of the pipe.
Vegetation/roots Vegetation/roots that reduce free movement of Water flows freely through pipes.
water through pipes.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Damage to protective Protective coating is damaged; rust or corrosion Pipe repaired or replaced.
coating or corrosion is weakening the structural integrity of any part of
pipe.
Damaged Any dent that decreases the cross section area of Pipe repaired or replaced.
pipe by more than 20% or is determined to have
weakened structural integrity of the pipe.
Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 Trash and debris cleared from
square feet of ditch and slopes. ditches.
Sediment Accumulated sediment that exceeds 20% of the Ditch cleaned/flushed of all sediment
accumulation design depth. and debris so that it matches design.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normaJ1y be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
po!Jution as oi!, gasoline, concrete slurries or paint. according to applicable regulaUons.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Vegetation Vegetation that reduces free movement of water Water flows freely through ditches.
through ditches.
Erosion damage to Any erosion observed on a ditch slope. Slopes are not eroding.
slopes
Rock lining out of One layer or less of rock exists above native soil Replace rocks to design standards.
place or missing (!f area 5 square feet or more, any exposed native
Applicable) soil.
2009 Surface Water Design Manual -Appendix A 1/9/2009
A-11
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 7 -DEBRIS BARRIERS (E.G., TRASH RACKS)
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed.
Site Trash and debris Trash or debris plugging more than 20% of the Barrier clear to receive capacity flow.
area of the barrier.
Sediment Sediment accumulation of greater than 20% of Barrier clear to receive capacity flow.
accumulation the area of the barrier
Structure Cracked broken or Structure which bars attached to is damaged -Structure barrier attached to is
loose pipe is loose or cracked or concrete structure is sound.
cracked, broken of loose.
Bars Bar spacing Bar spacing exceeds 6 inches. Bars have at most 6 inche spacing.
Damaged or missing Bars are bent out of shape more than 3 inches. Bars in place with no bends more
bars than% inch.
Bars are missing or entire barrier missing. Bars in place according to design.
Bars are loose and rust is causing 50% Repair or replace barrier to design
deterioration to any part of barrier. standards.
119/2009 2009 Surface Water Design Manual -Appendix A
A-12
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 9 -FENCING
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Erosion or holes Erosion or holes more than 4 inches high and 12-No access under the fence.
under fence 18 inches wide permitting access through an
opening under a fence.
Wood Posts, Boards Missing or damaged Missing or broken boards, post out of plumb by No gaps on fence due to missing or
and Cross Members parts more than 6 inches or cross members broken broken boards, post plumb to within
1 X inches, cross members sound.
Weakened by rotting Any part showing structural deterioration due to All parts offence are structurally
or insects rotting or insect damage sound.
Damaged or failed Concrete or metal attachments deteriorated or Post foundation capable of
post foundation unable to support posts. supporting posts even in strong
wind.
Metal Posts, Rails Damaged parts Post out of plumb more than 6 inches. Post plumb to within 1Yz inches.
and Fabric Top rails bent more than 6 inches. Top rail free of bends greater than
1 inch.
Any part of fence (including post, top rails, and Fence is aligned and meets design
fabric) more than 1 foot out of design alignment. standards.
Missing or loose tension wire. Tension wire in place and holding
fabric.
Deteriorated paint or Part or parts that have a rusting or scaling Structurally adequate posts or parts
protective coating condition that has affected structural adequacy. with a uniform protective coating.
Openings in fabric Openings in fabric are such that an 8-inch Fabric mesh openings within 50% of
diameter ball could fit through. grid size.
1/9/2009 2009 Surface Water Design Manual-Appendix A
A-14
APPENDIX A MAINTENAi'ICE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 10 -GATES/BOLLARDS/ACCESS BARRIERS
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Chain Link Fencing Damaged or missing Missing gate. Gates in place.
Gate members
Broken or missing hinges such that gate cannot Hinges intact and lubed. Gate is
be easily opened and closed by a maintenance working freely.
person.
Gate is out of plumb more than 6 inches and Gate is aligned and vertical.
more than 1 foot out of design alignment.
Missing stretcher bar, stretcher bands, and ties. Stretcher bar, bands, and ties in
place.
Locking mechanism Locking device missing, no-functioning or does Locking mechanism prevents
does not lock gate not link to all parts. opening of gate.
Openings in fabric Openings in fabric are such that an 8-inch Fabric mesh openings within 50% of
diameter ball could fit through. grid size.
Bar Gate Damaged or missing Cross bar does not swing open or closed, is Cross bar swings fully open and
cross bar missing or is bent to where it does not prevent closed and prevents vehicle access.
vehicle access.
Locking mechanism Locking device missing, no-functioning or does Locking mechanism prevents
does not lock gate not !ink to all parts. opening of gate.
Support post Support post does not hold cross bar up. Cross bar held up preventing vehicle
damaged access into facility.
Bollards Damaged or missing Bollard broken, missing, does not fit into support No access for motorized vehicles to
hole or hinge broken or missing. get into facility.
Does not lock Locking assembly or lock missing or cannot be No access for motorized vehicles to
attached to lock bollard in place. get into faclllty.
Boulders Dislodged Boulders not located to prevent motorized vehicle No access for motorized vehicles to
access. get into facility.
Circumvented Motorized vehicles going around or between No access for motorized vehicles to
boulders. get into faci!ity.
2009 Surface Water Design Manual -Appendix A 1/9/2009
A-15
APPENDIX A MAINTENA,"\ICE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 11 -GROUNDS (LANDSCAPING)
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash or litter Any trash and debris which exceed 1 cubic foot Trash and debris cleared from site.
per 1,000 square feet (this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there shou!d be no visual evidence of dumping.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other tha'n a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a
height. height no greater than 6 inches.
Trees and Shrubs Hazard Any tree or limb of a tree identified as having a No hazard trees in facility.
potential to fall and cause property damage or
threaten human life. A hazard tree identified by
a qualified arborist must be removed as soon
as possible.
Damaged Umbs or parts of trees or shrubs that are split or
broken which affect more than 25% of the total
Trees and shrubs with less than 5%
of total foliage with split or broken
foliage of the tree or shrub. limbs.
Trees or shrubs that have been blown down or No blown down vegetation or
knocked over. knocked over vegetation. Trees or
shrubs free of injury.
Trees or shrubs which are not adequately Tree or shrub in place and
supported or are leaning over, causing exposure adequately supported; dead or
of the roots. diseased trees removed.
1/9/2009 2009 Surface Water Design Manual -Appendix A
A-16
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 12 -ACCESS ROADS
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 Roadway drivable by maintenance
square feet (i.e., trash and debris would fill up vehicles.
one standards size garbage can).
Debris which could damage vehicle tires or Roadway drivable by maintenance
prohibit use of road. vehicles.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Blocked roadway Any obstruction which reduces clearance above Roadway overhead clear to 14 feet
road surface to less than 14 feet. high.
Any obstruction restricting the access to a 10-to At !east 12-foot of width on access
12 foot width for a distance of more than 12 feet road.
or any point restricting access to less than a 1 O
foot width.
Road Surface Erosion, settlement, Any surface defect which hinders or prevents Road drivable by maintenance
potholes, soft spots, maintenance access. vehicles.
ruts
Vegetation on road Trees or other vegetation prevent access to Maintenance vehicles can access
surface facility by maintenance vehicles. facility.
Shoulders and Erosion Erosion within 1 foot of the roadway more than 8 Shoulder free of erosion and
Ditches inches wide and 6 inches deep. matching the surrounding road.
Weeds and brush Weeds and brush exceed 18 inches in height or Weeds and brush cut to 2 inches in
hinder maintenance access. height or cleared in such a way as to
allow maintenance access.
Modular Grid Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
Pavement pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Damaged or missing Access surface compacted because of broken on Access road surface restored so
missing modular block. road infiltrates.
2009 Swface Water Design Manual -Appendix A 1/9/2009
A-17
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 20 -SAND FILTER VAULT
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash and debris Trash and debris accumulated on facility site. Trash and debris removed from
facility site.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Gr.ass/groundcover Grass or groundcover exceeds 18 iriches in Grass or groundcover mowed to a
height. height no greater than 6 inches.
Pre-Treatment Sediment Sediment accumulation exceeds the depth of the Sediment storage contains no
Chamber accumulation sediment zone plus 6 inches. sediment.
Sand Filter Media Sediment Sediment depth exceeds %-inch on sand filter Sand filter freely drains at normal
accumulation media. rate.
Trash and debris Trash and debris accumulated in vault (floatables No trash or debris in vault.
and non-floatables).
Plugging Drawdown of water through the sand filter media, Sand filter media drawdown rate is
takes longer than 24 hours, and/or flow through normal.
the overflow pipes occurs frequently. A sieve
analysis of >4% -100 or >2% -200 requires
replacing sand filter media.
Short circuiting Seepage or flow occurs along the vault walls and Sand filter media section re-laid and
corners. Sand eroding near inflow area. compacted along perimeter of vault
Cleanout wyes are not watertight. to form a semi-seal. Erosion
protection added to dissipate force
of incoming flow and curtail erosion.
Vault Structure Damaged to walls, Cracks wider than Yz-inch, any evidence of soil Vault replaced or repaired to provide
frame, bottom and/or entering the structure through cracks or qualified complete sealing of the structure.
top slab. inspection personnel determines that the vault is
not structurally sound.
Ventilation Ventilation area blocked or plugged. No reduction of ventilation area
exists.
Underdrains and Sediment/debris Underdrains or clean-outs partially plugged, filled Underdrains and clean-outs free of
Cleanouts with sediment and/or debris or not watertight. sediment and debris and sealed.
lnleUOutlet Pipe Sediment Sediment filling 20% or more of the pipe. Inlet/outlet pipes c!ear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged Cracks wider than Yz-inch at the joint of the No cracks more than %-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
1/9/2009 2009 Surface Water Design Manual-Appendix A
A-28
APPENDIX A MAJNTENANCE REQUffiEMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 20 -SAND FILTER VAULT
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Access Manhole Cover/lid not in place Cover/lid is missing or only partially in place. Manhole access covered.
Any open manhole requires immediate
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
not working maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and remove cover/lid after applying 80 lbs of lift. reinstalled by one maintenance
person.
Ladder rungs unsafe Missing rungs, misalignment, rust, or cracks. Ladder meets design standards.
Allows maintenance person safe
access.
Large access Damaged or difficult Large access doors or plates cannot be Replace or repair access door so it
doors/plate to open opened/removed using normal equipment. can opened as designed.
Gaps, doesn't cover Large access doors not flat and/or access Doors close flat and covers access
completely opening not completely covered. opening completely.
Lifting Rings missing, Lifting rings not capable of lifting weight of door Lifting rings sufficient to Ifft or
rusted or plate. remove door or plate.
2009 Surface W atcr Design Manual -Appendix A 119/2009
A-29
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 24-CATCH BASIN INSERT
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Media Insert Visible Oil Visible oil sheen passing through media Media inset replaced.
Insert does not fit Flow gels into catch basin without going through A!! flow goes through media.
catch basin properly media.
Filter media plugged Filter media plugged. Flow through filter media is norm a!.
Oil absorbent media Media oil saturated. Oil absorbent media replaced.
saturated
Water saturated Catch basin insert is saturated with water, which Insert replaced.
no longer has the capacity to absorb.
Service life exceeded Regular interval replacement due to typical Media replaced at manufacturer's
average life of media insert product, typically one recommended interval.
month.
Seasonal When storms occur and during the wet season. Remove, clean and replace or install
maintenance new insert after major storms,
monthly during the wet season or at
manufacturer's recommended
interval.
2009 Surface Water Design Manual -Appendix A 1/9/2009
A-35
APPENDIX "D" CSWPPP
This will be provided during final engineering.
© 2013 D.R. STRONG Consulting Engineers Inc.
Technical Information Report
51 Saddlebrook Div. II
Renton, Washington
D.R. STRONG
CONSULTING ENGINEERS