STRIDE Bus Rapid Transit
South Renton Transit Center (SRTC) Site Plan Review, Conditional Use Permit, Master Site
Plan Review, and Lot Line Adjustment Application
Attachment 23
Hazardous Materials Management Statement
June 2024
Prepared by the
South Renton Transit Center and Roadway Improvements
Project
Hazardous Materials Management Statement
A. Refueling and Hazardous Materials Inventory
Refueling of construction equipment and a hazardous materials inventory will be per the Spill
Prevention, Control, and Countermeasures (SPCC) Plan consistent with applicable City standards,
including Renton Municipal Code (RMC) 4-3-050G.8 and 4-4-030C.8, to be provided by the contractor.
B. RMC 4-4-030.C.8 Construction Activity Standards – Aquifer Protection Area Zone 2
The construction activity standards applicable in Aquifer Protection Area Zone 2, including a designated
person, secondary containment, securing hazardous materials, removal of leaking vehicles and
equipment, flammable and combustible liquids – storage and dispensing, clean-up equipment and
supplies, and unauthorized releases, will be addressed in the SPCC to be provided by the contractor. No
use of pesticides and fertilizers is proposed. The contractor is required to provide an SPCC for review
and approval.
The applicant will ensure this project construction will comply with requirements imposed by the City of
Renton Surface Water Design Manual that specify water quality standards that must be met during
construction. A Stormwater Pollution Prevention Plan, including a TESC Plan, will be prepared and
implemented to reduce and control potential groundwater and surface water runoff impacts and
comply with permit requirements during construction.