Loading...
HomeMy WebLinkAboutP_Turning_Radii_Exhibit_240607_v1 STRIDE Bus Rapid Transit South Renton Transit Center (SRTC) Site Plan Review, Conditional Use Permit, Master Site Plan Review, and Lot Line Adjustment Application Attachment 10 Turning Radii Exhibit June 2024 Prepared by the UTH H H H EECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3" CORAINIER AVE SHARDIE AVE SWBU S B A Y 1^^ ^ ^ ^ ^ ^ ^ ^UTH H H H EECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3" CORAINIER AVE SHARDIE AVE SWBU S B A Y 1^^ ^ ^ ^ ^ ^ ^ ^UTH H H H EECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3" CORAINIER AVE SHARDIE AVE SWBU S B A Y 1^^ ^ ^ ^ ^ ^ ^ ^ Lock to Lock Time Track Width : : : feet Coach45-bike AASHTO 6.0 8.50 8.50 28.5010.20 48.50 Steering Angle 45.2: Lock to Lock Time Track Width : : : feet Coach45-bike AASHTO 6.0 8.50 8.50 28.5010.20 48.50 Steering Angle 45.2: Lock to Lock Time Track Width : : : feet Coach45-bike AASHTO 6.0 8.50 8.50 28.5010.20 48.50 Steering Angle 45.2: GENERAL NOTES: 1.ALL TURNING MOVEMENTS WERE RAN AT 10 MPH.NSCALE IN FEET 025 5050 100 (1" = 50') No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV:LINE IS 1" ATFULL SCALEDESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY:05/30/24 | 8:20 AM | LREDMANC:\PWWORKING\JACOBS_B&I\JEG_EX-REDMANL\D0544696\AUTOTURNS.DWGAUTOTURNS FACILITY ID: FOR INFORMATION ONLY Xrefs: Transmission_Maint_Vehicle_AutoTURN Autoturn_08102022 xS1-BT120-CPP001 xS1-BT120-CMP001 xBRT-CUD05-TB22x34 xS1-BT120-VSF100 SRTC_SurfaceParkingLot_AutoTURN SRTC_SurfaceParkingLot AlternativeLayoutAutoTurns xS1-BT120-SFP101 xS1-BT120-APP211 CUP SUBMITTAL UTH H H H E ECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3" CORAINIER AVE SHARDIE AVE SWBU S B A Y 1^^ ^ ^ ^ ^ ^ ^ ^ Track Width : :Steering Angle Lock to Lock Time : : feet Bus60-bike AASHTO 38.3 6.0 8.50 8.50 Articulating Angle 50.0: 22.00 21.20 13.206.20 2.00 11.60 37.80UTH H H H E ECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3" CORAINIER AVE SHARDIE AVE SWBU S B A Y 1^^ ^ ^ ^ ^ ^ ^ ^UTH H H H E ECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3" CORAINIER AVE SHARDIE AVE SWBU S B A Y 1^^ ^ ^ ^ ^ ^ ^ ^ Lock to Lock Time Track Width : : : feet Coach45-bike AASHTO 6.0 8.50 8.50 28.5010.20 48.50 Steering Angle 45.2: Lock to Lock Time Track Width : : : feet Coach45-bike AASHTO 6.0 8.50 8.50 28.5010.20 48.50 Steering Angle 45.2: GENERAL NOTES: 1.ALL TURNING MOVEMENTS WERE RAN AT 10 MPH.NSCALE IN FEET 025 5050 100 (1" = 50') No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV:LINE IS 1" ATFULL SCALEDESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY:05/30/24 | 8:21 AM | LREDMANC:\PWWORKING\JACOBS_B&I\JEG_EX-REDMANL\D0544696\AUTOTURNS.DWGAUTOTURNS FACILITY ID: FOR INFORMATION ONLY Xrefs: Transmission_Maint_Vehicle_AutoTURN Autoturn_08102022 xS1-BT120-CPP001 xS1-BT120-CMP001 xBRT-CUD05-TB22x34 xS1-BT120-VSF100 SRTC_SurfaceParkingLot_AutoTURN SRTC_SurfaceParkingLot AlternativeLayoutAutoTurns xS1-BT120-SFP101 xS1-BT120-APP211 CUP SUBMITTAL UTH H H H E ECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3" CORAINIER AVE SHARDIE AVE SWBU S B A Y 1^^ ^ ^ ^ ^ ^ ^ ^UTH H H H E ECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3" CORAINIER AVE SHARDIE AVE SWBU S B A Y 1^^ ^ ^ ^ ^ ^ ^ ^UTH H H H E ECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3" CORAINIER AVE SHARDIE AVE SWBU S B A Y 1^^ ^ ^ ^ ^ ^ ^ ^ Track Width : :Steering Angle Lock to Lock Time : : feet Bus60-bike AASHTO 38.3 6.0 8.50 8.50 Articulating Angle 50.0: 22.00 21.20 13.206.20 2.00 11.60 37.80 Track Width : :Steering Angle Lock to Lock Time : : feet Bus60-bike AASHTO 38.3 6.0 8.50 8.50 Articulating Angle 50.0: 22.00 21.20 13.206.20 2.00 11.60 37.80 Track Width : :Steering Angle Lock to Lock Time : : feet Bus60-bike AASHTO 38.3 6.0 8.50 8.50 Articulating Angle 50.0: 22.00 21.20 13.206.20 2.00 11.60 37.80 GENERAL NOTES: 1.ALL TURNING MOVEMENTS WERE RAN AT 10 MPH.NSCALE IN FEET 025 5050 100 (1" = 50') No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV:LINE IS 1" ATFULL SCALEDESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY:05/30/24 | 8:22 AM | LREDMANC:\PWWORKING\JACOBS_B&I\JEG_EX-REDMANL\D0544696\AUTOTURNS.DWGAUTOTURNS FACILITY ID: FOR INFORMATION ONLY Xrefs: Transmission_Maint_Vehicle_AutoTURN Autoturn_08102022 xS1-BT120-CPP001 xS1-BT120-CMP001 xBRT-CUD05-TB22x34 xS1-BT120-VSF100 SRTC_SurfaceParkingLot_AutoTURN SRTC_SurfaceParkingLot AlternativeLayoutAutoTurns xS1-BT120-SFP101 xS1-BT120-APP211 CUP SUBMITTAL UTH H H H EECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3" CORAINIER AVE SHARDIE AVE SWBU S B A Y 1^^ ^ ^ ^ ^ ^ ^ ^ CO EEE E E E E EE E EEEE E E CO CO BU S B A Y 2 BU S B A Y 8 BU S B A Y 1^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ CO EEE E E E E EE E EEEE E E CO CO BU S B A Y 2 BU S B A Y 8 BU S B A Y 1^^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ Track Width : :Steering Angle Lock to Lock Time : : feet Bus60-bike AASHTO 38.3 6.0 8.50 8.50 Articulating Angle 50.0: 22.00 21.20 13.206.20 2.00 11.60 37.80 Track Width : :Steering Angle Lock to Lock Time : : feet Bus60-bike AASHTO 38.3 6.0 8.50 8.50 Articulating Angle 50.0: 22.00 21.20 13.206.20 2.00 11.60 37.80 Lock to Lock Time Track Width : : : feet Coach45-bike AASHTO 6.0 8.50 8.50 28.5010.20 48.50 Steering Angle 45.2: GENERAL NOTES: 1.ALL TURNING MOVEMENTS WERE RAN AT 10 MPH.NSCALE IN FEET 025 5050 100 (1" = 50') No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV:LINE IS 1" ATFULL SCALEDESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY:05/30/24 | 8:23 AM | LREDMANC:\PWWORKING\JACOBS_B&I\JEG_EX-REDMANL\D0544696\AUTOTURNS.DWGAUTOTURNS FACILITY ID: FOR INFORMATION ONLY Xrefs: Transmission_Maint_Vehicle_AutoTURN Autoturn_08102022 xS1-BT120-CPP001 xS1-BT120-CMP001 xBRT-CUD05-TB22x34 xS1-BT120-VSF100 SRTC_SurfaceParkingLot_AutoTURN SRTC_SurfaceParkingLot AlternativeLayoutAutoTurns xS1-BT120-SFP101 xS1-BT120-APP211 CUP SUBMITTAL E E E E LAKE AVE SBUS BAY 5 BUS BAY 4 ^^^^^^^^^^^^ E E E E LAKE AVE SBUS BAY 5 BUS BAY 4 ^^^^^^^^^^^^ Lock to Lock Time Track Width : : : feet Coach45-bike AASHTO 6.0 8.50 8.50 28.5010.20 48.50 Steering Angle 45.2: Track Width : :Steering Angle Lock to Lock Time : : feet Bus60-bike AASHTO 38.3 6.0 8.50 8.50 Articulating Angle 50.0: 22.00 21.20 13.206.20 2.00 11.60 37.80 GENERAL NOTES: 1.ALL TURNING MOVEMENTS WERE RAN AT 10 MPH.NSCALE IN FEET 025 5050 100 (1" = 50') No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV:LINE IS 1" ATFULL SCALEDESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY:05/30/24 | 8:25 AM | LREDMANC:\PWWORKING\JACOBS_B&I\JEG_EX-REDMANL\D0544696\AUTOTURNS.DWGAUTOTURNS FACILITY ID: FOR INFORMATION ONLY Xrefs: Transmission_Maint_Vehicle_AutoTURN Autoturn_08102022 xS1-BT120-CPP001 xS1-BT120-CMP001 xBRT-CUD05-TB22x34 xS1-BT120-VSF100 SRTC_SurfaceParkingLot_AutoTURN SRTC_SurfaceParkingLot AlternativeLayoutAutoTurns xS1-BT120-SFP101 xS1-BT120-APP211 CUP SUBMITTAL E E E E LAKE AVE SBUS BAY 5 BUS BAY 4 ^^^^^^^^^^^^ Lock to Lock Time Track Width : : : feet Coach45-bike AASHTO 6.0 8.50 8.50 28.5010.20 48.50 Steering Angle 45.2: Track Width : :Steering Angle Lock to Lock Time : : feet Bus60-bike AASHTO 38.3 6.0 8.50 8.50 Articulating Angle 50.0: 22.00 21.20 13.206.20 2.00 11.60 37.80 E E E E LAKE AVE SBUS BAY 5 BUS BAY 4 ^^^^^^^^^^^^ GENERAL NOTES: 1.ALL TURNING MOVEMENTS WERE RAN AT 10 MPH.NSCALE IN FEET 025 5050 100 (1" = 50') No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV:LINE IS 1" ATFULL SCALEDESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY:05/30/24 | 8:25 AM | LREDMANC:\PWWORKING\JACOBS_B&I\JEG_EX-REDMANL\D0544696\AUTOTURNS.DWGAUTOTURNS FACILITY ID: FOR INFORMATION ONLY Xrefs: Transmission_Maint_Vehicle_AutoTURN Autoturn_08102022 xS1-BT120-CPP001 xS1-BT120-CMP001 xBRT-CUD05-TB22x34 xS1-BT120-VSF100 SRTC_SurfaceParkingLot_AutoTURN SRTC_SurfaceParkingLot AlternativeLayoutAutoTurns xS1-BT120-SFP101 xS1-BT120-APP211 CUP SUBMITTAL UTH H H H EECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3"RAINIER AVE SHARDIE AVE SWBU S B A Y 1 ^ ^ ^ ^ ^ ^ ^ ^UTH H H H EECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3"RAINIER AVE SHARDIE AVE SWBU S B A Y 1 ^ ^ ^ ^ ^ ^ ^ ^UTH H H H EECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3"RAINIER AVE SHARDIE AVE SWBU S B A Y 1 ^ ^ ^ ^ ^ ^ ^ ^ Lock to Lock Time Track Width : : : feet Coach45-bike AASHTO 6.0 8.50 8.50 28.5010.20 48.50 Steering Angle 45.2: Lock to Lock Time Track Width : : : feet Coach45-bike AASHTO 6.0 8.50 8.50 28.5010.20 48.50 Steering Angle 45.2: Lock to Lock Time Track Width : : : feet Coach45-bike AASHTO 6.0 8.50 8.50 28.5010.20 48.50 Steering Angle 45.2: GENERAL NOTES: 1.ALL TURNING MOVEMENTS WERE RAN AT 10 MPH.NSCALE IN FEET 025 5050 100 (1" = 50') No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV:LINE IS 1" ATFULL SCALEDESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY:04/09/24 | 1:10 PM | LREDMANC:\PWWORKING\JACOBS_B&I\JEG_EX-REDMANL\D0544696\AUTOTURNS.DWGAUTOTURNS FACILITY ID: FOR INFORMATION ONLY Xrefs: Transmission_Maint_Vehicle_AutoTURN Autoturn_08102022 xS1-BT120-CPP001 xS1-BT120-CMP001 xBRT-CUD05-TB22x34 xS1-BT120-VSF100 SRTC_SurfaceParkingLot_AutoTURN SRTC_SurfaceParkingLot AlternativeLayoutAutoTurns xS1-BT120-SFP101 xS1-BT120-APP211 CONC//////// //// //////////////// / ///////////////// /////////IER AVE S NBDIE AVE SWSR-167 NBSR-167 SBUTH H H////SW SWSWSWSWSS SS SS SWSWSWSW L RD ///////////////// / ///RAINIER AVE SHARDIE AVE SWRAINIER AVE S8:1 TAPERBUS B A Y 7 BUS B A Y 6 BUS B A Y 5 BUS BAY 2 BUS BAY 8 BUS B A Y 3 BUS B A Y 4 BUS BAY 1 X X X X X X X X CORE F A C STOR A G E LAKE AVES G R A D Y W A Y8:1 TAPERBUS B A Y 7 BUS B A Y 6 BUS B A Y 5 BUS BAY 2 BUS BAY 8 BUS B A Y 3 BUS B A Y 4 BUS BAY 1 X X X X X X X X CORE F A C STOR A G E 801+47 246+0 0 247+0 0 248+0 0 SCALE IN FEET 0 4020 8040 (1" = 40')NTrack Width : :Steering Angle Lock to Lock Time : : feet Bus60-bike AASHTO 38.3 6.0 8.50 8.50 Articulating Angle 50.0: 22.00 21.20 13.206.20 2.00 11.60 37.80 CUP SUBMITTAL UTH H H H E ECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3"RAINIER AVE SHARDIE AVE SWBU S B A Y 1 ^ ^ ^ ^ ^ ^ ^ ^ Track Width : :Steering Angle Lock to Lock Time : : feet Bus60-bike AASHTO 38.3 6.0 8.50 8.50 Articulating Angle 50.0: 22.00 21.20 13.206.20 2.00 11.60 37.80UTH H H H E ECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3"RAINIER AVE SHARDIE AVE SWBU S B A Y 1 ^ ^ ^ ^ ^ ^ ^ ^UTH H H H E ECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3"RAINIER AVE SHARDIE AVE SWBU S B A Y 1 ^ ^ ^ ^ ^ ^ ^ ^ Lock to Lock Time Track Width : : : feet Coach45-bike AASHTO 6.0 8.50 8.50 28.5010.20 48.50 Steering Angle 45.2: Lock to Lock Time Track Width : : : feet Coach45-bike AASHTO 6.0 8.50 8.50 28.5010.20 48.50 Steering Angle 45.2: GENERAL NOTES: 1.ALL TURNING MOVEMENTS WERE RAN AT 10 MPH.NSCALE IN FEET 025 5050 100 (1" = 50') No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV:LINE IS 1" ATFULL SCALEDESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY:04/09/24 | 1:27 PM | LREDMANC:\PWWORKING\JACOBS_B&I\JEG_EX-REDMANL\D0544696\AUTOTURNS.DWGAUTOTURNS FACILITY ID: FOR INFORMATION ONLY Xrefs: Transmission_Maint_Vehicle_AutoTURN Autoturn_08102022 xS1-BT120-CPP001 xS1-BT120-CMP001 xBRT-CUD05-TB22x34 xS1-BT120-VSF100 SRTC_SurfaceParkingLot_AutoTURN SRTC_SurfaceParkingLot AlternativeLayoutAutoTurns xS1-BT120-SFP101 xS1-BT120-APP211 CONC//////// //// /////////////// ////////////////// / /////////IER AVE S NBDIE AVE SWSR-167 NBSR-167 SBUTH H H////SW SWSWSWSWSS SS SS SWSWSWSW LRD ////////////// / / / / / //RAINIER AVE SHARDIE AVE SWRAINIER AVE S8:1 TAPERBUS B A Y 7 BUS B A Y 6 BUS B A Y 5 BUS BAY 2 BUS BAY 8 BUS B A Y 3 BUS B A Y 4 BUS BAY 1 X X X X X X X X CORE F A C STOR A G E LAKE AVES GR A D Y W A Y8:1 TAPERBUS B A Y 7 BUS B A Y 6 BUS B A Y 5 BUS BAY 2 BUS BAY 8 BUS B A Y 3 BUS B A Y 4 BUS BAY 1 X X X X X X X X CORE F A C STOR A G E 801+47 246+0 0 247+0 0 248+0 0 SCALE IN FEET 0 4020 8040 (1" = 40')NTrack Width : :Steering Angle Lock to Lock Time : : feet Bus60-bike AASHTO 38.3 6.0 8.50 8.50 Articulating Angle 50.0: 22.00 21.20 13.206.20 2.00 11.60 37.80 CUP SUBMITTAL UTH H H H E ECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3"RAINIER AVE SHARDIE AVE SWBU S B A Y 1 ^ ^ ^ ^ ^ ^ ^ ^UTH H H H E ECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3"RAINIER AVE SHARDIE AVE SWBU S B A Y 1 ^ ^ ^ ^ ^ ^ ^ ^UTH H H H E ECO EEEE EGVGVGV EEEEGV //////////////////////E E EEE E GV 2'11" DP 6'9" DP 1'DP 1'11" DP2'3"DP2' DP2' DP 3'11" DP 3'11" DP 6'4" D P 6'3" D P 6'7" D P 2' DP 3'2"DP 2'6" DP 4'11" DP3'11" DP2'8" DP3'10" DP3'3" DP5'6" DP2'DP3'1" 2'11"3'3"RAINIER AVE SHARDIE AVE SWBU S B A Y 1 ^ ^ ^ ^ ^ ^ ^ ^ Track Width : :Steering Angle Lock to Lock Time : : feet Bus60-bike AASHTO 38.3 6.0 8.50 8.50 Articulating Angle 50.0: 22.00 21.20 13.206.20 2.00 11.60 37.80 Track Width : :Steering Angle Lock to Lock Time : : feet Bus60-bike AASHTO 38.3 6.0 8.50 8.50 Articulating Angle 50.0: 22.00 21.20 13.206.20 2.00 11.60 37.80 Track Width : :Steering Angle Lock to Lock Time : : feet Bus60-bike AASHTO 38.3 6.0 8.50 8.50 Articulating Angle 50.0: 22.00 21.20 13.206.20 2.00 11.60 37.80 GENERAL NOTES: 1.ALL TURNING MOVEMENTS WERE RAN AT 10 MPH.NSCALE IN FEET 025 5050 100 (1" = 50') No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV:LINE IS 1" ATFULL SCALEDESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY:04/09/24 | 1:36 PM | LREDMANC:\PWWORKING\JACOBS_B&I\JEG_EX-REDMANL\D0544696\AUTOTURNS.DWGAUTOTURNS FACILITY ID: FOR INFORMATION ONLY Xrefs: Transmission_Maint_Vehicle_AutoTURN Autoturn_08102022 xS1-BT120-CPP001 xS1-BT120-CMP001 xBRT-CUD05-TB22x34 xS1-BT120-VSF100 SRTC_SurfaceParkingLot_AutoTURN SRTC_SurfaceParkingLot AlternativeLayoutAutoTurns xS1-BT120-SFP101 xS1-BT120-APP211 CONC/// / //// //// /////////////// ////////////////// //////////IER AVE S NBDIE AVE SWSR-167 NBSR-167 SBUTH H H////SW SWSWSWSWSS SS SS SWSWSWSW L R D ///////////// / / / / / / //RAINIER AVE SHARDIE AVE SWRAINIER AVE S8:1 TAPERBUS B A Y 7 BUS B A Y 6 BUS B A Y 5 BUS BAY 2 BUS BAY 8 BUS B A Y 3 BUS B A Y 4 BUS BAY 1 X X X X X X X X CORE F A C STORA G E LAKE AVES G R A D Y W A Y8:1 TAPERBUS B A Y 7 BUS B A Y 6 BUS B A Y 5 BUS BAY 2 BUS BAY 8 BUS B A Y 3 BUS B A Y 4 BUS BAY 1 X X X X X X X X CORE F A C STORA G E 801+47 246+0 0 247+0 0 248+0 0 SCALE IN FEET 0 4020 8040 (1" = 40')NTrack Width : :Steering Angle Lock to Lock Time : : feet Bus60-bike AASHTO 38.3 6.0 8.50 8.50 Articulating Angle 50.0: 22.00 21.20 13.206.20 2.00 11.60 37.80 CUP SUBMITTAL