STRIDE Bus Rapid Transit
South Renton Transit Center (SRTC) Site Plan Review, Conditional Use Permit, Master Site
Plan Review, and Lot Line Adjustment Application
Attachment 34
Grading Plan
June 2024
Prepared by the
2827292728272626 2626
27
27
2828
27
27
272827
302829
27
28 262727 26 2728292
9
28
26
242728
26
2725
262627262728 27
26
26
30
29
30
29
2
9
2
8
2
7
2728
27
26
26272
8
28
29
29
29
2828
27 27
26
2829 28
27
27
28292928
26 262627
28
29
3029
28 272626
26262628272626
2726
27
2626
27
262727272929282729
28
27
28
2627
28
26 26 27 2726
26
26 26
26
2
7
26 26 27 27CONC
SIGN
SIGN SIGNSIGN UTH
H
H
H
H
H
HDRWDRW
DRW
E
EEEE
EE
E
E E E
E
E
CO
2VLTS
HH
CONC
SLEE
E
FO FO FO
FO FO FOWWWWWW W
W
WWW
W
WWEEEEEEC
FOFOFO
PC
BUS B
A
Y
7
BUS B
A
Y
6
BUS B
A
Y
5
B
U
S
B
A
Y
2
B
U
S
B
A
Y
8
BUS B
A
Y
3
BUS B
A
Y
4
B
U
S
B
A
Y
1^^
^
^
^
^
^
^
^
^
^
^
^
^
^
^
^^^^^^^^^^^^^^^^^^^^
100.01'
62.50'
63.68'
8
9
.
7
0
'21.11'43.02'67.72'27.45'31.41
'113.36'16.00'51
.
3
5
'
2
3
.
3
3
'16.00'81.23'30.00'84
.
0
0
'30.00'6
0
.
0
0
'30.00'180.00'
28.17
28.17
28.17
28.17
28.17
28.17
17.50'28.50'24.73'8" SD
8" SD15.0
0'
15' MINIMUM FRONT
YARD SETBACKRAINIER AVE SS GRADY WAY LAKE AVE SHARDIEAVE SW31
2
.
3
2
401.76
220.13184.43651.42
109
.8
660.86100.82330.5220.5
6
70.51BUS CH
A
R
G
I
N
G
A
R
E
A
COREFACILITYSECURITYBUILDINGREFUSE AND
RECYCLING AREA
EX FOUNDATION
TO BE REMOVED
EX FOUNDATION
TO BE REMOVED
EX FOUNDATION
TO BE REMOVED
PROPERTY LINE
GANTRY
3.
3
2
%1.06%2.11
%
1.55
%
2.
1
2
%
1.89
%
0.57
%
2.
7
5
%1.98%1.74%
2.21%
2.09%
22025708STATE O F WASHIN
G
T
ONREGISTE R E DPROFESSIONAL E N G INEERLORI B E T H RED
MANSCALE IN FEET
0 4020 8040
(1" = 40')
N
NOT FOR CONSTRUCTION
05/29/24 | 9:51 PM | LREDMANC:\PWWORKING\JACOBS_B&I\JEG_EX-REDMANL\D0512859\GRADINGPLAN.DWG CUP SUBMITTAL
GRADING PLAN
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
GENERAL NOTES:
1.AREA OF PROPERTY: 328,666 SF
2.AREA OF WORK: 328,666 SF
3. TOTAL REMOVED:
SOIL: 12,906 CY
TOTAL ADDED:
GRAVEL BORROW: 14,150 CY
CSBC: 10,405 TONS
CSTC: 3,279 TONS
4. ORIGIN OF FILL SOIL AND
DESTINATION OF SOIL NOT KNOWN
AT THIS TIME, WILL BE DETERMINED
BY THE CONTRACTOR.
5.ALL INFORMATION FOR TREE SIZE,
SPECIES, APPROXIMATE DRIP LINE
AND ASSOCIATED SETBACK AREAS,
SEE TREE RETENTION / LAND
CLEARING (TREE INVENTORY) PLAN.
6.METHOD OF TREE PROTECTION
DURING CONSTRUCTION FOUND
WITHIN TREE INVENTORY TABLE AND
ARBORIST REPORT.
7.PROPOSED DRAINAGE CHANNELS
AND PIPES, SEE DRAINAGE CONTROL
PLAN.
8.SEE RIGHT-OF-WAY MONUMENTATION
PLAN (SURVEY) FOR ROW AND
EASEMENTS INFORMATION.
LEGEND:
TREE TO BE REMOVED
EXISTING CONTOURS
PROPOSED CONTOURS29
27