Loading...
HomeMy WebLinkAboutP_Colored_Rendering_240607_v1 STRIDE Bus Rapid Transit South Renton Transit Center (SRTC) Site Plan Review, Conditional Use Permit, Master Site Plan Review, and Lot Line Adjustment Application Attachment 39 Colored Rendering June 2024 Prepared by the DRAWING NO.: FACILITY ID: SHEET No:REV: SCALE: FILENAME: CONTRACT No.: SUBMITTAL DATE:DATE:LINE IS 1" ATFULL SCALEREVIEWED BY:DATE:SUBMITTED BY: DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: NOT FOR CONSTRUCTION CUP SUBMITTAL BIM 360://US WA_D3458600_BUS_RAPID_TRANSIT_GEC/S1-BT120-A-v2020.rvt5/29/2024 3:28:54 PMBT120 S1-BT120-A-v2020 RTA/OA 0206-19 10/22/2024 04/05/2024 C. CHEANG J. CHAN D. HOGAN C. CHEANG STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 BT120-AES811 04/05/2024R. PARGAS J. ALTCHECH ARCHITECTURE EXTERIOR RENDERING TRANSIT CENTER VIEW OF TRANSIT CENTER SOUTHWEST ELEVATION FROM RAINER AVENUE SOUTH VIEW OF TRANSIT CENTER AND CORE FACILITY WEST ELEVATIONS FROM RAINER AVENUE SOUTH VIEW OF TRANSIT CENTER EAST ELEVATION FROM LAKE AVENUE SOUTH VIEW OF GANTRY SOUTHEAST ELEVATION FROM LAKE AVENUE SOUTH DRAWING NO.: FACILITY ID: SHEET No: REV: SCALE: FILENAME: CONTRACT No.: SUBMITTAL DATE:DATE:LINE IS 1" ATFULL SCALEREVIEWED BY:DATE:SUBMITTED BY: DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: NOT FOR CONSTRUCTION CUP SUBMITTAL BIM 360://US WA_D3458600_BUS_RAPID_TRANSIT_GEC/S1-BT120-A-v2020.rvt5/29/2024 3:28:54 PMBT120 S1-BT120-A-v2020 RTA/OA 0206-19 10/22/2024 04/05/2024 C. CHEANG J. CHAN D. HOGAN C. CHEANG STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 BT120-AES812 04/05/2024R. PARGAS J. ALTCHECH ARCHITECTURE EXTERIOR RENDERING TRANSIT CENTER VIEW OF CORE FACILITY WEST ELEVATION FROM RAINIER AVENUE SOUTH VIEW OF TRANSIT CENTER AND CORE FACILITY SOUTH ELEVATIONS FROM SOUTH GRADY WAY VIEW OF CHARGING STATION SOUTH ELEVATION FROM SOUTH GRADY WAY VIEW OF CHARGING GANTRY SOUTH ELEVATION FROM SOUTH GRADY WAY