STRIDE Bus Rapid Transit
South Renton Transit Center (SRTC) Site Plan Review, Conditional Use Permit, Master Site
Plan Review, and Lot Line Adjustment Application
Attachment 39
Colored Rendering
June 2024
Prepared by the
DRAWING NO.:
FACILITY ID:
SHEET No:REV:
SCALE:
FILENAME:
CONTRACT No.:
SUBMITTAL DATE:DATE:LINE IS 1" ATFULL SCALEREVIEWED BY:DATE:SUBMITTED BY:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
NOT FOR CONSTRUCTION
CUP SUBMITTAL
BIM 360://US WA_D3458600_BUS_RAPID_TRANSIT_GEC/S1-BT120-A-v2020.rvt5/29/2024 3:28:54 PMBT120
S1-BT120-A-v2020
RTA/OA 0206-19
10/22/2024 04/05/2024
C. CHEANG
J. CHAN
D. HOGAN
C. CHEANG
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
BT120-AES811
04/05/2024R. PARGAS J. ALTCHECH
ARCHITECTURE
EXTERIOR RENDERING
TRANSIT CENTER
VIEW OF TRANSIT CENTER SOUTHWEST ELEVATION FROM RAINER AVENUE SOUTH
VIEW OF TRANSIT CENTER AND CORE FACILITY WEST ELEVATIONS FROM
RAINER AVENUE SOUTH
VIEW OF TRANSIT CENTER EAST ELEVATION FROM LAKE AVENUE SOUTH
VIEW OF GANTRY SOUTHEAST ELEVATION FROM LAKE AVENUE SOUTH
DRAWING NO.:
FACILITY ID:
SHEET No: REV:
SCALE:
FILENAME:
CONTRACT No.:
SUBMITTAL DATE:DATE:LINE IS 1" ATFULL SCALEREVIEWED BY:DATE:SUBMITTED BY:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
NOT FOR CONSTRUCTION
CUP SUBMITTAL
BIM 360://US WA_D3458600_BUS_RAPID_TRANSIT_GEC/S1-BT120-A-v2020.rvt5/29/2024 3:28:54 PMBT120
S1-BT120-A-v2020
RTA/OA 0206-19
10/22/2024 04/05/2024
C. CHEANG
J. CHAN
D. HOGAN
C. CHEANG
STRIDE BUS RAPID TRANSIT
SOUTH RENTON TRANSIT CENTER
BT105
BT120-AES812
04/05/2024R. PARGAS J. ALTCHECH
ARCHITECTURE
EXTERIOR RENDERING
TRANSIT CENTER
VIEW OF CORE FACILITY WEST ELEVATION FROM RAINIER AVENUE SOUTH
VIEW OF TRANSIT CENTER AND CORE FACILITY SOUTH ELEVATIONS
FROM SOUTH GRADY WAY
VIEW OF CHARGING STATION SOUTH ELEVATION FROM SOUTH GRADY WAY
VIEW OF CHARGING GANTRY SOUTH ELEVATION FROM SOUTH GRADY WAY