HomeMy WebLinkAboutReport 01cky of DEPARTMENT DE COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: December 9, 2013 TO: Gerald Wasser, Planner FROM: Rohini Nair, Plan Review SUBJECT: 2001 Union Avenue NE Short Plat PRE13-001619 NOTE: The applicant is cautioned that information contained in this summary is preliminary and non- binding and may be subject to modification and/or concurrence by official city decision -makers. Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant_ I have completed a preliminary review for the above -referenced proposal. The fol{owing comments are based on the pre -application submittal made to the City of Renton by the applicant. WATER The proposed development is within the City of Renton's Highlands 565 pressure zone water service area. There is an existing 12 -inch water main in on the east side of Union Ave NE that can deliver 3000 gpm fire flow at 20 psi residual pressure. The static water pressure at the site is approximately 54 psi (at elevation 440 feet). There currently is a 3/ -inch meter serving the existing house on the property. According to Renton Fire Department review comments, the fire flow requirement for a single family home is 1,000 gpm minimum for dwellings up to 3,600 square feet (including garage and basements). If the dwelling exceeds 3,600 square feet, a minimum of 1,500 gpm fire flow would be required. A minimum of one fire hydrant is required within 300 -feet of the proposed buildings and two hydrants if the fire flow goes up to 1,500 gpm. In order to provide adequate fire protection and to conform to City of Renton Code and Development Standards, the following water main improvements will be required. (see attached conceptual water main layout): 1. Construction of approximately 460 feet of 8 -inch water main connecting to the existing 12 -inch water main in Union Ave NE and extending westward to the west property line of the subject property. 2. Installation of fire hydrants as required by Renton Fire Dept. F F D JUL 14 H14 2001 Union Ave Short Plat- PRE13-0 Page 2 of 4 December 9, 2013 3. Installation of 1 -inch minimum domestic water services and meters to the new lots from the new 8 -inch water main. If the houses are to have fire sprinkler systems the sprinkler designer will determine the service size. 4. The development is subject to payment of a water system development charge (SDC) fee of $2,809.00 (2014 fee rate) and a water meter installation fee of $3,310.00 (2014 fee rate) for each 1 -inch meter. These fees, as well as any related permit fees, are collected at the time a construction permit is issued and the rate that is current at that time will be applicable. The meters will be installed by the City_ 5. Civil plans for the water main improvements will be required and must be prepared by a registered professional engineer in the State of Washington. SANITARY SEWER 1. Sewer service is provided by the City of Renton. 2_ The sewer main on Union Ave Street has an 8 -inch diameter pipe. Extension of 8" diameter sewer main through the proposed site access up to the west property line of the site is required. All the lots must connect to the new sewer main using new side sewer stubs installed by the developer. The sites must be graded suitably to achieve gravity sewer flow (otherwise forced sewer service may be required). 3. SDC fee for sewer is based on the size of the new domestic water to serve the new home on each lot. The sewer fee for a %-inch or 1 -inch meter install is $2,033.00 in 2014. 4_ The Honey Creek sewer Interceptor Special Assessment District fee will be applicable on the project. SURFACE WATER A drainage report complying with the City adopted 2009 icing County Surface Water Manual and City Amendments will be required. Based on the City's flow control map, the site falls within the Flow Control Duration Standard (Forested Site Can i ns). The project is required to use the Flow Control Duration Standard (forested conditions) as the existing pre -developed condition. Refer to Figure 1.1.2.A -- Flow chart, for determining the type of drainage review required in the City of Renton 2009 Surface Water Design Manual Amendment. Stormwater BMPs applicable to the individual lots must be provided. The drainage report must account for all the improvements provided by the project. Stormwater improvements based on the drainage report study will be required to be provided by the developer_ A�eotechnicawlreportor the site is required. Information on the water table, and soilpe,mmendations of appropriate flow control BMP options with typical /. designs for the site from the geotechnical engineer, shall be submitted with the application. 3. Surface water system development (SDC) fee will be $1,2280.00 (2014 rate) for each lot. TRANSPORTATION H:\CED\Planning\Current Planning\PREAP PS\13-001619_lerry\PIan Review Comments PRE13-001619.doc 2001 Union Ave Short Plat- PRE13-- - 619 Page 3of4 December 9, 2013 1. Internal street access Option A. Private streets are allowed for access to six lots, provided at least two lots abut a public right of way, so that there are only four lots not abutting the public right of way. In the site layout included in the current submittal, only one lot abuts a public right of way, so the internal street will serve five lots not abutting the public right of way. A public street is to be provided as the access. A limited access public street may be considered with Fire Department approval. Available space to provide adequate separation between utility lines must also be considered. Option B: Reduce the total number of lots to 4 lots not abutting the right of way. Then a private street may be used as access. As per RMC 4-6-060, a private street must have a minimum access easement of 26 feet and paved width of 20 feet. Consider adequate separation between utility lines. 2. As per RMC 4-6-060, dead end streets longer than 150 feet length require a hammer head or cul-de-sac turnaround. Dead end streets longer than 300 feet in length require a cul-de-sac. The turnaround / cul-de-sac must also meet with Fire Department approval. A street lighting level analysis is to be done by the developer and street lights are required to be provided. by the developer on Union Ave and on the internal public street. If the internal street is private, street lighting analysis is required on Union Ave. 4. Payment of the transportation impact fee is applicable on the construction of the single family houses at the time of building.permit application. The current transportation impact fee rate is $717.75 per single family house. The impact fee for this type of land use will increase on January 1, 2014, to $1,430.72 per single family house. The transportation impact fee that is current at the time of building permit application will be levied, payable at issuance of building permit. 5. Union Ave is a Minor Arterial. The existing right-of-way (ROW) width on Union Ave is 60 feet as per the King County assessor map. Asper the RMC 4-6-060, A Minor Arterial with 4 lanes requires a right of way width of 91 feet with a paved travel width of 54 feet. However, Transportation Department has determined that the existing paved width is sufficient for this portion of Union Ave. The frontage improvements of the frontage on Union Ave consists of 0.5 feet wide curb, gutter, storm drainage, 8 feet wide landscaped planter, and 8 feet wide sidewalk. The frontage improvements are to be provided by the developer along with the necessary right of way dedication. A street modification request may be submitted by the developer to the City, for the Rgln& ���� 6. The residential public street requirements, per city street standards Renton Municipal Code 4-6- 060, include a 53 feet ROW width with 20 -foot wide paved roadway, 6 -foot wide on street parking, 0.5 -foot wide curb, 8 -foot wide landscaped planter, and a 5 -foot wide sidewalk. A limited residential access public street may be considered as the access to serve up to 25 lots- A limited access public street has a ROW width of 45 feet and 18 feet paved width with 0.5 feet wide curbs, gutters, storm drainage, 5 feet wide sidewalks, and 8 feet wide landscaped planter strips between the curb and sidewalk. Available space to provide adequate separation between utility lines must also be considered. 7. Driveway requirements are based on section I of the Renton Municipal code4-4-080. The maximum width of a single family driveway with single loaded garage is 9 feet and with double H:\CED\Planning\Current Planning\PREAPPS\13-001619.Jerry\Plan Review Comments PRE13-001619.doc 2001 Union Ave short Plat— PRE13-0 Page 4 of 4 December 9, 2013 loaded garage is 16 feet. The minimum distance between a driveway and a property line is 5 feet. Traffic safety guidelines include a minimum distance of 20 feet between driveways (to avoid potential traffic turning movement conflicts). H:\CED\Planning\Current Planning\PREAPPS\13-001519.Jerry\Plan Review Comments PRE13-001619.doc Fire & Emergency Services r City o Department M E M O R A N D U M DATE: 11/27/2013 12:00:00AM TO: Gerald Wasser, Associate Planner FROM: Corey Thomas, Plan Review/Inspector SUBJECT. (2001 Union Short Plat Preapplication) PRE13-001619 1. The fire flow requirement for a single family home is 1,000 gpm minimum for dwellings up to 3,600 square feet (including garage and basements). If the dwelling exceeds 3,600 square feet, a minimum of 1,500 gpm fire flow would be required. A minimum of one fire hydrant is required within 3DD-feet of the proposed buildings and two hydrants if the fire flow goes up to 1,500 gpm. There is one existing fire hydrant that can be counted toward the requirement, it does not have the required storz fitting however. A minimum of one new hydrant and a water main extension will be required. It appears there is adequate fire flow in this area. 2. The fire impact fees are applicable at the rate of $479.28 per single family unit_ This fee is paid prior to recording the plat. Credit will be granted for the existing home to be removed. 3. Fire department apparatus access roadways are required to be a minimum of 20 -feet wide fully paved, with 25 -feet inside and 45 -feet outside turning radius. Fire access roadways shall be constructed to support a 30 -ton vehicle with 322 -psi point loading. Access is required within 150 -feet of all points on the buildings. Approved apparatus turnarounds are required for dead end roads exceeding 150 -feet Hammerhead turnarounds are allowed for dead end streets up to 300 -feet long_ Access as proposed appears adequate_ Page 1 of 1 0 PREAPPLICATION MEETING FOR 2001 Union Ave Short Plat 2001 Union Ave PRE 13-001619 CITY OF RENTON Department of Community & Economic Development Planning Division December 12, 2013 Contact Information: pi:V —731, q— Planner: Jerry Wasser, 425.430.7382 Public Works Plan Reviewer: Rohini Nair, 425.430.7298 Fire Prevention Reviewer: Corey Thomas, 425.430.7024 Building Department Reviewer: Craig Burnell, 425.430.7290 Please retain this packet throughout the course of your project as a reference. Consider giving copies of it to any engineers, architects, and contractors who work on the project. You will need to submit a copy of this packet when you apply for land use and/or environmental permits. Pre-screening: When you have the project application ready for submittal, call and schedule an appointment with the project manager to have it pre-screened before making all of the required copies. The pre -application meeting is informal and non-binding. The comments provided on the proposal are based on the codes and policies in effect at the time of review. The applicant is cautioned that the development regulations are regularly amended and the proposal will be formally reviewed under the regulations in effect at the time of project submittal. The information contained in this summary is subject to modification and/or concurrence by official decision -makers (e.g., Hearing Examiner, Planning Director, Development Services Director, Department of Community & Economic Development Administrator, Public Works Administrator and City Council). ei _:, DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: December 1Z, 2013 TO: Pre -Application Fife No. 13-001619 FROM: Jerry Wasser, Associate Planner (Comments Prepared by Jennifer Henning) SUBJECT: 2001 Union Ave Short Plat (#042305-9077) General: We have completed a preliminary review of the pre -application for the above - referenced development proposal. The following comments on development and permitting issues are based on the pre -application submittals made to the City of Renton by the applicant and the codes in effect on the date of review. The applicant is cautioned that information contained in this summary may be subject to modification and/or concurrence by official decision -makers (e.g., Hearing Examiner, Community & Economic Development Administrator, Public Works Administrator, Planning Director, Development Services Director, and City Council). Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant. The applicant is encouraged to review all applicable sections of the Renton Municipal Code. The Development Regulations are available for purchase for $50.00 plus tax, from the Finance Division on the first floor of City Hall or online at www.rentonwa.gov Project Proposal: The subject property is located on the west side of Union Ave NE on a parcel developed with a single family home and detached garage. The project site totals 49,093 SF in area 0.12 acres); and is zoned Residential -8 (R-8) du/ac The proposal is to subdivide the existing parcel into 6 lots for the future construction of single family residences. Access to site is proposed via a 26 -foot wide private street with an emergency hammerhead turnaround. Two tracts are shown for access. Storm drainage is proposed to be either infiltration or via a storm dispersion trench on the western portion of the site_ Current Use: The site contains an existing single family home and detached garage which would be removed in order to accommodate the short plat- Zoning/Density Requirements: The subject property is zoned Residential - 8 dwelling units per acre (R-8). The density range allowed in the R-8 zone is a minimum of 4.0 to a maximum of 8.0 dwelling units per acre (du/ac). The area of public and private streets and critical areas would be deducted from the gross site area to determine the "net" site area prior to calculating density_ Based on the provided design there appears to be approximately 9,719 SF of access easements. Following the deduction of the access easement, the net area for development would be 39,374 SF. Using the net square footage and the proposal of 6 lots arrives at a net density of approximately 6.66 du/ac (6 lots / 0.90 acres = 6.66 du/ac), which is within the density h:\ced\planning\current plan ning\preapps\13-00D1619.jerry\13-001.619 (2001 union ave ne short plat, 6 -Sots, r-8 zone).doc 2001 Union Ave NE Short Plat Page 7 of 4 December 12, 2013 range permitted in the R-8 zone. The project would need to meet density requirements using "net" square footage. Development Standards. The project would be subject to RMC 4-2-110A, "Development Standards for Single Family Zoning Designations" effective at the time of complete application (noted as "R-8 standards" herein). Minimum Lot Size Width and Depth —The minimum lot size permitted in the R-8 is 4,500 square feet for parcels greater than 1 acre in size and 5,000 square feet for lots 1 acre or less in size_ The total lot area of the subject site is more than 1 acre; therefore a minimum lot size of 4,500 square feet is applicable to the proposed project. A minimum lot width of 50 feet for interior lots and 60 feet for corner lots, as well as a minimum lot depth of 65 feet, is also required. The proposal appears to comply with the lot size, width and depth requirements of the zone. Building Standards —The R-8 zone allows a maximum building coverage of 35% of the lot area or 2,500 square feet, whichever is greater for lots over 5,000 square feet in size and a maximum impervious surface 75%. Building height is restricted to 30 feet from existing grade. Detached accessory structures must remain below a height of 15 feet. The gross floor area must be less than that of the primary structure. Accessory structures are also included in building lot coverage calculations. The proposal's compliance with the building standards would be verified at the time of building permit review for the new residences to be located on all lots. Building Design Standards -- All single family residences would be subject to the Residential Design Standards outlined in RMC 4-2-115. The proposal's compliance with the residential design standards would be verified at the time of building permit review for the new residences to be located on all lots. Please take not of the following standards One of the following is required: • Lot width variation of 10 feet (10') minimum of one per four (4) abutting street -fronting lots, or • Minimum of four (4) lot sizes (minimum of four hundred (400) gross square feet size difference) for at least every four (4) abutting street fronting lots, or • A front yard setback variation of at least five feet (5') minimum for at least every four (4) abutting street fronting lots. Setbacks Setbacks are the minimum required distance between the building footprint and the property line and any private access easement. The required setbacks in the R -S zone are 15 feet in front for the primary structure and 20 feet in front for the attached garage, 20 feet in the rear, 5 feet on interior side yards, and 15 feet on side yards along streets (including access easements) for the primary structure and 20 feet on side yards along streets (including access easements) for the attached garage_ The setbacks for the new residences would be reviewed at the time of building permit. Access/Parking. Access to site appears to be proposed via a 26 -foot access tract in combination. The access tract would extend from Union Ave NE. Note: Private streets are allowed for access to six lots, provided at least two of the lots abut a public right -of --way. The proposal shows that only one lot would abut the public right-of-way, therefore, either a public street is needed, or the project would need to be reduced to a maximum of five lots. h:\ced\planning\currert planning\preapps\13-o0o1619.jerry\13-001619 (2001 union ave ne short plat, 6 -lots, r-8 zone).dac 20C1 Union Ave NF Short Fiat Page 3 of 4 December 12, 2013 Alley: Alley access is the preferred access pattern in the R-8 zoning classification. However, an Administrative Code Interpretation (CI -41) requires the decision maker to evaluate the practicality of alleys within a development when the development is a short plat with densities Between 6.01 du/ac and 8 du/ac. Due to the density identified with the application alley access would be required to be evaluated based on the following. All new development in an area that has existing alleys shall take access off the alley_ New development in areas without existing alleys shall utilize alley access on interior lots_ If it can be demonstrated through an evaluation that the use of alley(s) is not feasible practical, the use of alleys may not be required_ Any or all of the following factors may apply and should be considered in evaluating whether the use of alleys is not practical: a_ Size: the new development is o short plat b_ Topography: the topography of the site proposed for development is not conducive for on alley configuration. c_ Environmental Impacts: the use of alleys would have more of a negative impact on the environment than a street pattern without alleys. Driveways: The maximum driveway slopes cannot exceed 15%/provided that driveways exceeding W. are to provide slotted drains at the lower end of the driveway_ If the grade exceeds 15%, a variance is required. Landscaping — Except for critical areas, all portions of the development area not covered by structures, required parking, access, circulation or service areas, must be landscaped with native, drought -resistant vegetative cover, The development standards require that all pervious areas within the property boundaries be landscaped. The minimum on-site landscape width required along street frontages is 10 feet. (Vote: The project would be required to provide an 8 -foot landscaped strip and 5 -foot sidewalk. Please refer to landscape regulations (RMC 4-4-070) for further general and specific landscape requirements (enclosed). Significant Tree Retention: If significant trees (greater than 6 -inch caliper) are proposed to be removed a tree inventory and a tree retention plan along with a tree retention worksheet skull be provided with the formal land use application. The tree retention plan must show preservation of at feast 30 percent of significant trees, and indicate how proposed building footprints would be sited to accommodate preservation of significant trees that would be retained. If the trees cannot be retained, subject to review and approval, they may be replaced with minimum 2 inch caliper trees at a ratio of six to one. Critical Areas: The City of Renton's Critical Areas maps indicate the subject site is located within the Aquifer Protection Zone. The overall purpose of the aquifer protection regulations is to protect aquifers used as potable water supply sources by the City from contamination by hazardous materials. Some uses are restricted that store, handle, treat, use, or produce substances that pose a hazard to groundwater quality. If fill is used, then a fill source statement is needed. Environmental Review: Short plats are exempt from Environmental (SEPA) Review unless critical areas are found to exist on the subject property. h:\ced\planning\current planning\preapps\13-0001619.jerry\13-001619 (2001 union ave ne short plat, 6 -lots, r-8 zone).doc 2041 Union Ave NE Short Plat Page 4 of 4 December 12, 2013 Permit Requirements: The proposed subdivision would require a Preliminary Short Plat Approval. All land use permits would be processed within an estimated time frame of 6-8 weeks. The Preliminary Short Plat Review application fee is $1,400. A 3% technology fee would also be assessed at the time of land use application_ Detailed information regarding the land use application submittal is provided in the attached handouts. Fees: In In addition to the applicable building and construction fees, the following impact fees would be required prior to the issuance of building permits: • A Fire Mitigation fee of $479.28 per new single family residence; and • A Transportation Mitigation Fee based on $717.75 per new single family residence; and • A Parks Mitigation Fee based on $530.76 per new single family residence, and A 10 • A Renton School District Impact Fee based on $6,395 per new single family k/ f residence.11-], Fees will change January 1, 2014. A handout listing all of the City's Development related fees is attached for your review. Expiration: The preliminary short plat approval is valid for two years with a possible one-year extension. h:\ced\planning\current planning\preapp5\13-0001619.jerry\13-001619 (2001 union ave ne short plat, 6 -lots, r-8 zone).doc it �' =� ."✓<7 5E ^9G v1Ga t g IT' IL }c a I slll� 3 R§ oR'� RN. Q, y IQ �_ Cl iii I 2 �1�c Y 111 v {p OA Z� ' nz , fill', it > 7f. nX- o a t I,RgL�Z Z. n [,? Z r mf I r 3 .f10' 95. 1' i�i fii pian' a`J VVV� ffl� as rm�, vi p \ O 4 � i 7 O I I a5 � n n CI4 t 20.83' 1 2o.a4' $o Q ;u a $ o !� O v m a l 7J I . 'm` r p !cl a � x< K C) ri111 Ik > 2 S Z SS o MoD a � > I ,9i S6 u c y$ m gI qmo .._ ....1_ _ 1•� ! INION AVE _ Ex;]din I b i o D VCL.IFACE ................._.._--•----------•--.._.._. �;-----••---- r- PRE13-uOl619 2001 Union Ave SHPL Notes NDne 1:1,554 130 0 65 '30 eet VJ S_1534_%lVeb_Me-caior_Auxiliary_Sphere Ci�.xenrfW i � . Finance & IT Division Legend City and County Labels City and County f3ourdary Jlher �;I1 of Renlan Adtesses aarcels Environment Designations 11 \d, if al ElSrorrlre 77Hi h Ircnr.;i{,d Sromllrc Isola; rd Hlgh inran,ir� lWormation Technology- GIs R entor W1apSu p ports Rent onwa.gov � 17_i61?Oi3 1 his mnp s a i er aerr -. +' slay r. - f n . �-� n te�F' �napp ❑p ' =and r r, -'e -e cr rcy Lia _ Ayers th2l, a .ear tii -n—me may n_t :e a._ura_, E]Terl of utl e mr s , acle. THIS MAP IS NOT TO BE'JSED FOR NAVIGATION PROJECT NARRATIVE FOR 2001 Union Ave Short Plat 2001 UNION AVE NE RENTON, WA 58056 This project involves a single parcel of approximately 1.12 acres. The project is situated in the northeast end of the City of Renton. It is located within Southeast quarter of Section 4, Township 23 North, Range 5 East, W. M. The proposal is to create 5 single-family lots, "Fill in" subdivision. Access to the proposed project will be from existing street, Union Avenue NE. The site is bounded on the north, east and south by single-family lots, and it is bounded on the west by Union Avenue NE. The land use permit required for this project will be the Short Plat permit. The soils on the site are composed of Alderwood (AgC) fine sand and sandy loam per the King County Soil Survey. This type of soil is designated by King County as Type C soil, The site is flat with average grade of 2-3 percent. There are no steep slopes on the site. The surface water flows from East to West. The existing utilities on Union Ave NE will be for water and sewer_ There are two types of storm system that will be explored for this site for the new impervious surfaces. The fiat will be an infiltration system for each lot depending on how the soil perks. The second would be a detention system with a dispersion trench to the west and that will control the water runoff from the site. The flow from the site will be directed to the southwest. The proposed development of the property is considered as "infill" project and it is located in a Single Family (SF) zone. The City of Renton designates the site with the SF zoning. The SF zoning allows for a minimum lot size of 4500 square feet and a maximum density of 8 units per acre_ The setbacks allowed in the SF zone are as follows: front yard setbacks, 20 feet; rear yard setbacks, 20 feet, and side yards setbacks, 5 feet on all interior lots, and 15 feet on comer lots. The City of Renton Comprehensive Plan designates the site as Single -Family Residence, which is consistent with present zoning. The density for the proposed six lots yield a density of 6.74 DU/ACRE which is more than the minimum of 5.0 and less than 8.0 required by Code. We will be request a deferment of certain street off-site improvements from the City Code RMC 4-6-060. The City of Renton Transportation Department has determined that the existing width of paved road on Union Ave NE meets the requirements of the RMC 4-6-060 code. This request is to defer the frontage improvements of an 8' wide planter and 8' wide sidewalk along the Westerly side of Union Ave NE. There is 8.50 feet of Right of way dedication that will be acquired by the city on the easterly side of the site. There will be grading for the pond and for the private road serving the proposed lots. The access to the proposed lots will be thru a 26' access and utilities easement from Union Ave NE. Lot 1 will access from Union Ave NE. The quantity of excavation for the private road is estimated at less than 150 cu. Yd. Of course additional grading will be required when the new homes are built There is approximate of 2200 cy.yds needed for the construction of the detention pond and the westerly lots of the short plat. The estimated construction costs of the proposed short Plat will be approximately $ 20,000_ The proposed private road will follow existing contour. The development of the private road and associated utilities extension do not required great amount of grading. JUL 14 L0, �J V There are trees scattered over the site particularly in the westerly portion of the lot. There are some smaller firs lying on the in the easterly boundary of the lot and a few fruit trees scattered though out the property. There are a total of 27 trees on site. Majority of the trees will fall within the building envelopes, Tract A and B, and the Right of way dedicated area and will be removed and similarly, the trees situated along the perimeter out site the property will not be affected and will remain, Dan Touma Touma Engineers and Land Surveyors, PLLC 255 SW 41st Street Renton, WA 98057 CONSTRUCTION MITIGATION PLAN For 2001 Union Ave Short Plat PROPOSED CONSTRUCTION DATES The proposed construction of the street and utilities on the project will proceed once the final construction drawings are approved by the City of Renton, and all applicable permits are received. This construction will be performed under one contract for the entire development without phasing. Extension of construction time may be required. The construction of the houses will begin after the road and utilities have been completed and accepted by the City. HOURS OF OPERATION The hours of operation will be limited to Hours between 5:00 am to 5:00 PM. These hours may be shortened or lengthened with the approval of the City of Renton Department of Public Works. Typically, construction of this nature will occur during the daytime hours, 5 or 6 days a week. PROPOSED HAULING/TRANSPORTATION ROUTES The eartbwork that anticipated on this project is not significant_ All vegetation and non -marketable small trees will be chipped and hauled off site to an approved disposal site. Stripping (topsoil) that may be taken from the site area depending on the quality of the material may be taken from the site. If the material is acceptable, it may be spread along the front and back of the lots for planting of lawns. In the event disposal of the chipped material is required, then the hauling and disposal will be to an acceptable site, as allowed by the City of Renton. All marketable trees designated to be removed will be cut and removed from the site. See attached preliminary traffic control for the connections of water, Sewer and storm to Union Ave NE. The hauling and transportation routes will be mainly via 2001 Union Ave NE. Thence South on Union Ave NE to Sunset Boulevard NE and depending on location of fill or export. The hauling of Transportation will head East or West along Sunset Boulevard N.E. The hauling will be limited to excavated access material and new material to be used for construction of the plat improvements. CONSTRUCTION MITIGATION Construction equipment used on this site will be typical backhoes, a small CAT and grader, and roller. The equipment will be used in accordance with the City of Renton requirements. The measures to be implemented during construction to minimize dust, traffic and transportation impacts, mud, noise, etc. will be in accordance with the City's requirements. Erosion control measures will be implemented during construction, such as silt fences, temporary ditches and ponds. Detail erosion plans will be prepared showing control facilities. ,JUL i 4 2014 Print Form Reset Form CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT N?,IME', 1-�, ,. Cab l (:, I el- -- PER%q T # CONSTRUCTION rT'O?l CO1 P ?11Y; uh1 o A Me PHONE#: CONTACT NAME: ADDRESS_ E-%-IAdL ADDRESS: FAX? €'ROjECT LOCATION: Zab 6 Un(arl Adm N!E,,'S,,W OF: V.j0RK T1ME: APPROVED BY. P remit Holder agrees tc a!i tfie fcllcvaing: con"Ply w4h all traffic regtdation-s of thic City of ,Rti-�!ntor; and the State of Prepare a traffic control plan and olatain City approval of that plan. ;11at pla€� shall i,e i€�pien er'aci for aii Street and One CiC5Ures. and the pan shall --n i ornpi-iance 'wjth the Manual or, Unitcrrt) Trafflc Coritrol Devices. FJC't fy cm; crgenry s%rvf ces (253-852-2121) twenty- our i24) hoiwlrs befoi"e any street or 'sane CiCsL-res_ - Ary lame or snee_t n4sures not to ionfor-, rant v ith tiiE7 app7oveu r-affiC i.L nt-, of pian and/or v',' thi o,.,t ;:i.'EifiC;a'jcn of emegency spokes may r esuh in rewWnE a citadon Wr Vt; I ion of ROtvA 1-7.36000 _h ilu66 4T3S220. 9A-36.0150 Reckless rriangeinne3t" and othor v-'i;:abz'P :tare _-)d City cod2C. 1r demn.ify and hold harmless the City of Renton trOrl any and a l claims, actions, and judgments, Mudog af' cc^St5 defense and altomey's fees hwurrad in a__fedKiIg rigtnk Sal q ad ing f:`om and ii•=llttd *01mmpll "mr.nt'aticn "-or the ;pproed wairiL corwrK f ns W4°i] ng cidims arising fro(i_I]�fiv"i?b '~. physe vehicle_ and the acts of the Permit Holder's agents a-nd employees. T he i by f Renton ~hail be entitled, in is reasonable discreTion, ro 4ettle claims prior is sU€t OF ;ldgment, and in such event shad ir1CJeET my and Wald , arrric5s 're City for any such ClaM paid, fila, City(', attoti-teVs ties and ii f ation. co'S S resljit:ng from Such dlaim a in the Event 1,% or suh is brought cai~Mnk CRY rifirli� the _CDUe cfthiSAgreement, Permit Holder .'Si:i pay a- iega: counsel chosen by the City to defend agAnsi same. • dagger and sign ; lacernent are Si,1byct to reAMon by t1 c "..ity lnspector on Sit£', needi=c! to Bddlre�Ss ti affic or pedestrian safety or travel. 8y my si; nnture herein, i acknowledge all the above red ,irerrF�i ts. PRINT TIAME: DATE; N -41 '_"in. NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City's PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must beat the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow -away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the fallowing apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. if deemed abandoned, City crews will remove and store them at the City's maintenance shop (3555 NE 20d Street). LANE CLOSURE WITH FLAGOM CONTROL STANDARD PLAN K-30.4040 x x x x q q N N q 50 MIN. SIGN SPACING - % (1) RURAL HIDIW AYS 00165 MPH 800't RURAL ROADS �. 45 J 55 µPH 500 t RURAL RDADS k URBAN ARTERIALS 36140 MPH 3w:k RURAL ROADS, URBAN ARTERIALS, 2b J Ili MPH RESVENML d BUSINESS UISTRICT8 200' t M_ URBAN ME2b MPH OR LESS 100' t {2) All BIL3N6 ARE BLACK ON ORANGE UNLESS DESIGNATED OTHERWISE SKETCH T'QAFF►c- PATES -N t D i% o-� NORTH - 40111111V 1 4p� 10 50' MON, T ISO B 1OP MAX X X X X �0 DEYIGES' MIN, 14 V p f - uWiO�a Ado 1AW LONGITUDINAL BUFFER SPACE ■ B POSTED SPEW (MPH) LENGTH B (FEET) 25 W 36 155 200 26O 1 40 146 50 06 fm I B6 1 305 1 39D 425 496 670 I MS DENSITY WORKSHEET City of Renton Development Servs Division 1055 South Grady Way -Renton, WA 98055 Phone:425-430-7200 Fax 425-430-7231 1. Gross area of property: 1 49,093 square feet 2. Deduction: Certain areas are excluded from density calculations. Public street ** Private access easements`* Critical Areas* Total excluded area: 3. Subtract Line 2 from line 1 for net area: 4. Divide lien 3 by 43,560 for net acreage 5. Number of dwelling units or lots planned 6. Divide line 5 by line 4 for net density 1,029 square feet 9291 square feet square feet 2 10,320 square feet 3 38,773 square feet 4 0.890 acres 5 6 unittlots 6 6.74 du/acre * Critical Areas are defined as "Areas determined by the City to be not suitable for development and which are subject to the City's Critical Areas Regulations including very high landslide areas, protected slopes, wetlands or floodways" Critical Areas buffers are not deducted/excluded. ** Alleys (public or private) donor have to be excluded, Project: 2001 UNION AVE SHORT PLAT Date 06/16/14 JUL 14 ; low Gry of Renton TREE RETENTION WORKSHEET 1. Total number of trees over 6" in diameter' on project site: 1. 24 trees 2. Deductions: Certain trees are excluded from the retention calculation: Trees that are dead, diseased or dangerous2 1 trees Trees in proposed public streets trees Trees in proposed private access easements/tracts 17 trees Trees in critical areas and buffers trees Total number of excluded trees: 2. 18 trees 3. Subtract line 2 from fine 1: 3. 6 trees 4. Next, to determine the number of trees that must be retained4, multiply line 3 by: 0.3 in zones RC, R-1, RA or R-8 0.1 in all other residential zones 0.05 in all commercial and industrial zones 4. 1.8 trees 5. List the number of 6" or larger trees that you are proposing to retain 4: 5. D trees 6. Subtract line 5 from line 4 for trees to be replaced: 6. 1.8 trees (If line 6 is less than zero, stop here. No replacement trees are required). 7. Multiply line 6 by 12" for number of required replacement inches: 7. 21 inches 8. Proposed size of trees to meet additional planting requirement: (Minimum 2" caliper trees required) 8. 2 Inches per tree 9. Divide line 7 by line 8 for number of replacement trees6: (if remainder is .5 or greater, round up to the next whole number) 9. 10 trees i. Measured at chest height. 2. dead, diseased or dangerous trees must be Certified as such by a forester, registered landscape architect, or certified arborist, and approved by the City. 9. Critical Areas, such as wetlands, streams, floodplains and protected slopes, are defined in Section 4-3-050 of the Renton Municipal Code (RMC). ` Count only those trees to be retained outside of critical areas and buffers. s' The City may require modification of the tree retention plan to ensure retention of the maximum number of trees per RMC 4-4-130H7a Inches of street trees, inches of trees added to critical areas/buffers, and inches of trees r i e ,ori That are less than 6" but are greater than 2" can be used to meet the tree replacement requiremeft: .' U i_ dl C:lUsers%Dan\Documents%Word Doucurnentsltree inventory work sheetslTreeRetentionWorksheet 917003.doc 12/08 APPLICATION FOR CITY OF RENTON RIGHT OF WAY USE - DEFERRALS - WAIVERS - VARIANCES -- FEE IN LIEU 1055 South Grady Way, Renton, WA 98055 (425) 430-7216 PROJECT NAME: -2to t QvNkon A4e, tllc t))A0zT P(AT- SITE ADDRESS: On\o,-% AA.At lx1 LEGAL DESCRIPTION OF PROPERTY: See - Include King County Assessors Parcel APPLICANT: +►, V S" PHONE: CELL: 20(0-- 3fv3 -5 y 4g BUSINESS ADDRESS: 'ZotLe U � t °, Soy Zip Code ATTACH A SEPARATE LETTER WITH THIS APPLICATION STATING IN DETAIL: 1. The request 2. Applicable City Code 3. Items and quantities involved 4. Justification for request 5. Amount of time requested 6. Provide vicinity map (8-112 x 11 inches) Attach a drawing or sketch of your proposal. Mail or drop off the completed application and map to: CITY OF RENTON Development Services Division Jan Illian, Coordinator 1055 --- S. Grady Way 6`f` Floor Renton, WA 98057 425-430-7216 Completed applications will be reviewed and a written determination issued approximately 3-4 weeks from date of receipt of application. You will be c:=Ecation incomplete or if additional information is required. APPLICANT'S SIGNATURE: DATE: 01'* -1-, It OFFICE USE ONLY OFFICE USE ONLY OFFICE USE ONLY OFFICE USE ONLY DEFERRAL ( ) New Offsite Onsite O Extension VARIANCE ( ) New O Extension ( } Underground ( ) Driveway EXCESS R/W () FEE IN LIEU ( ) WAIVER ( } HAFilc Sys113PW -Board of Public Wo6 3WPLICAT10N1BPW2007.doe () Slope Grades () Noise P Fr'% F.M V F D JUL 14 ?014 Touma Engineers & Land Surveyor, PLLC July 3, 2014 Department of Development Services City of Renton 1055 S Grady Way Renton, WA 98057 RE: APPLICATION FOR CITY OF RENTON BOARD OF PUBLIC WORKS 2001 Union Ave NE Short Plat (PRE 13-001619) 1. The Request We request deferment of certain street off-site improvements from the City Code RMC 4-6- 060. The City of Renton Transportation Department has determined that the existing width of paved road on Union Ave NE meets the requirements of the RMC 4-6-060 code. This request is to defer the frontage improvements of an 8' wide planter and 8' wide sidewalk along the Westerly side of Union Ave NE. The applicant is providing the necessary right of way dedication to allow the planter and side walk to be installed in a future date. The adjacent property to the North and South are consistent to the existing conditions of the subject property. 2. Applicable City Code City of Renton Code RMC -4-6-060, a minor arterial street 3. Items and Quantities Involved Defer installation of 8 foot planter and 8' sidewalk along The Westerly side of Union Ave S. 4. Justification for Request The applicant request is to delay installation of the planter and sidewalk improvements. because of the adjacent properties to the North and South are consistent to the existing conditions of the subject property. 5. Time Allotment Required for Request The applicant request to deferment of the construction of the addition of 8' planter and 8' sidewalk street improvements until the City of Renton improves Union Ave to meet the RMC 4-6-060 code 255 SW 41st Street, Renton, Washington 98057 425-251-0665 mhtouma@aol.com r FILE NO. 719-003-014 PREPARED BY TOUMA ENGINEERS 255 SW 41St STREET RENTON, WA. 98057 (425) 251-0665 July 1,2014 JUL 14 TABLE OF CONTENTS I. PROJECT OVERVIEW Figure 1: T.I.R. Worksheet Figure 2: Site Location Figure 3: Soil Map H. CONDITIONS & REQUIREMENTS SUMMARY NIA III. OFF-SITE ANALYSIS Figure 4: Downstream Analysis Map Offsite Analysis Drainage System Table Appendix A IV. FLOW CONTROL & WATER QUALITY FACILITY ANALYSIS AND DESIGN Part A — Existing Site Hydrology Part B — Developed Site Hydrology Part C Performance Standards Part D — Flow Control System Part E — Water Quality System Map -A - Existing Area Map Map —B -Post Development Area Map V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN Figure 6: Conveyance Map VI. SPECIAL REPORTS AND STUDIES Soil Report By GeoResources, LLC, dated May 23, 2014 VIL OTHER PERMITS Building Permits VIIL CSWPPP ANALYSIS AND DESIGN IX. BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT X. OPERATIONS AND MAINTENANCE MANUAL PROJECT OVERVIEW The subject property involved in this plat covers an area of approximately 1.12 acres. The property is situated in the north end of the City, and bounded on the East by Union Ave NE and residential single families to the North, West and South. Access to the property will be from. Union Ave NE with a 26' wide access road. This site is within a conservation flow control area and must match the developed peak discharge rates to the existing site conditions for 50% of the 2 year through the 50 year return periods. We will design a detention/retention pond facility situated on the West side of the site for flow control and water quality measures. The project area slopes down to the west with average slopes of 3%. The development falls within one basin. The existing surface water flows to the East to the West to a local low point on the westerly side of the site. The surface runoff on the site will be directed through smooth lined LCPE pipes to open pond serving both detention and water quality treatment The controlled outflow will be directed to existing storm system situated on Union Ave NE. Detention and water quality systems will be designed using the Renton amendment of the 2009 King County Surface Water Design Manual. The runoff will be tributary to May Creek. See the downstream description later in this report. The soil type of the site is Alderwood AgC, glacial till. Existing groundcover consists mainly of Alder and Fir forest, with ground cover shrubs. Refer to Geotechnical Engineering Study, performed by Gco Group NW, Inc. The proposed plat will create 5 lots with lot ranging in size from 4829 square feet to 7606 square feet. The plat improvements will be designed to City of Renton Standards and requirements for streets. storm, sewer, water and streetlights. ll. CONDITIONS AND REQUIREMENTS SUMMARY Conditions and requirements for this project include all eight Core Requirements and all five Special Requirements listed in the CORE REQUIREMENT 41: DISCHARGE AT NATURAL LOCATION The allowable outflow from the site will be discharged to its natural location. The lowest elevation on the site is approximately 434. Refer to Figure 3 for visual representation of discharge locations. CORE REQUIREMENTS #2: OFF-SITE ANALYSIS The Off-site analysis is included in this report on subsequent pages. CORE REQUIREMENTS 43: FLOW CONTROL2009 City of Renton amendments to King County Surface Water Design Manual (KCSWDM)_ Dated February 2010 The detention calculations will be based on Level 2 flow control standard which matches historic duration's fair '12 the 2 year through the 50 year peaks, and also matches historic 2 year and 10 year peaks. Roadways, sidewalks, roof top, driveway, landscape, and grassed areas will be picked up and directed open a pond used for both detention and water quality_ The new impervious surfaces subject to traffic or automobiles will be more than 5000 square feet._ The calculations are provided on subsequent pages addressing runoff rate. The sizing for detention and runoff control facility and its routing calculations are included in this report. CORE REQUIREMENTS #4: CONVEYANCE SYSTEM New conveyance system will be installed in conjunction with this development. The system will be designed to collect and convey the 25 -year peak flow. Refer to Section V: Conveyance System Analysis and Design for a more detailed description. Refer to the "Analysis of Conveyance Pipes" calculation provided under this item. CORE REQUIREMENTS #5: EROSION/SEDD4ENTATION CONTROL PLAN The Era sion/Sedimentation control facilities will consist of filter fabric fences to be placed along the north, northeast and northwest boundaries of the site. Temporary Erosion and Sedimentation traps and ground cover measures will be considered for water quality control during construction of plat improvements. CORE REQUIREMENTS #6: MAINTENANCE AND OPERATION Maintenance of the conveyance system within the site will be the responsibility of the property owners within this subdivision. CORE REQUIREMENTS 47: FINANCIAL GUARANTEES AND LIABILITY The developer will post financial guarantees and liabilities for this project as required. CORE REQUIREMENTS #S WATER QUALITY The new impervious surfaces that are added in this development is greater than 5000 square feet. There will be water quality facility is designed for this development consisting of we -pond situated below live detention storage_ SPECIAL REQUIREMENTS (KCSWDM Section 1.3) Special Requirement #1: Other adopted Area -Specific Requirements There are no known adopted area -specific requirements. The site falls within the May Creek Basin area. Level 2 criteria for storm analysis. Special Requirement 92: Flood Hazard Area Delineation There are no flood hazard areas associated with the project site. A review the iMap information shows that there is no flood plain within this site. Special Requirement #3: Flood Protection Facilities Not Applicable. Special Requirement #4: Source Controls MIA Special Requirement #S: Oil Control Per the thresholds given in Section 1.3.5 of the 2009 KCSWDM, the proposed site is not a high -use site. KING COUNTY, WAStlINGTON, SURFACE WATER DESIGN ]MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 1 PROJECT OWNER AND PROJECT ENGINEER Project Owner k Phone Address 67 Project Engineer Company Phone ,a Part 3 TYPE OF PERMIT APPLICATION W3_Landuse Services Subdivison I Short Subd. / UPD ❑ Building Services MJF 1 Commerical I SFR ❑ Clearing and Grading ❑ Right -of -Way Use ❑ Other Part 2 PROJECT LOCATION AND DESCRIPTION Project Name DDES Permit # Location Township C T Range Section Site Address Part 4 OTHER REVIEWS AND PERMITS ❑ DFW HPA ❑ Shoreline ❑ COE 404 Management ❑ DOE Dam Safety ❑ Structural Date (include revision RockeryNault/ Ll FEMA Floodplain Ll Section 7 L3 COE Wetlands Date of Final: ❑ Other Part 5 PIAN AND REPORT INFORMATION Technical Information Report Site Improvement Plan (Engr. Plans) Type of Drainage Review Fulll Targeted / Type (circle one):Full~' Modified 1 (circle): arge Site Small Site Date (include revision Date (include revision dates): dates): Date of Final: Date of Final: Part B ADJUSTMENT APPROVALS Type (circle one):`Standdar )l Complex / Preapplication I Experimental ! Blanket Description: (include conditions in TIR Section 2) Date of Approval: 2009 Surface Water Design Manual I/9?2009 r/(�i - l KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL. TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 7 MONITORING REQUIREMENTS Monitoring Required: Yes --, Start Date: `�� Completion Date: Describe: ❑ Lake ❑ Erosion Hazard ❑ Wetlands Part 8 SITE COMMUNITY AND DRAINAGE BASIN Community Plan: ` r is Special District Overlays: n Drainage Basin:i"G Stormwater Requirements. Part9 ONSITE AND ADJACENT SENSITIVE AREAS ❑ River/Stream ❑ Steep Slope ❑ Lake ❑ Erosion Hazard ❑ Wetlands ❑ Landslide Hazard ❑ Closed Depression ❑ Coal Mine Hazard ❑ Floodplain ❑ Seismic Hazard ❑ Other ❑ Habitat Protection ❑ Part 10 SOILS Soil Type Slopes Erosion Potential ❑ High Groundwater Table (within 5 feet) ❑ Sole Source Aquifer ❑ Other ❑ Seeps/Springs ❑ Additional Sheets Attached 2009 Surface Watcr Design Manual 2 1/9/2009 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part11. DRAINAGE DESIGN LIMITATIONS REFERENCE LIMITATION / SITE CONSTRAINT ❑ Core 2 -- Offsite Analysis ❑ Sensitive/Critical Areas ❑ SEPA ❑ Other La ❑ Additional Sheets Attached i Part 12 TIR SUMMARY SHEET(provide one TIR Summary Sheet per Threshold Discharge Area Threshold Discharge Area: name or description) Core Requirements (all 8 apply) Discharge at Natural Location Number of Natural Discharge Locations: Offsite Analysis Level: 1 1 2 / 3 dated:.`._�u+r'� Flow Control Level: 1 1 3 or Exemption Number incl. facility summary sheet Small Site B s Conveyance System Spill containment located at: Erosion and Sediment Control ESC Site Supervisor: Contact Phone: After Hours Phone: Maintenance and Operation Responsibility: Private 1 Public If Private, Maintenance LoQ Re uire& Yes No Financial Guarantees and Provided: Yes /(,No-) Liability Water Quality Type: Basic Sens_ Lake / Enhanced Basicm / Bog (include facility summary sheet) or Exemption No. Landscape Management Plan: Yes / No Special Requirements as applicable) Area Specific Drainage Type: CDA 1 SDO / MDP / BP 1 LMP / Shared Fac. / one Requirements Name: FlaodplainlFloodway Delineation Type: Major / Minor / Exemption P None 100 -year Base Flood Elevation (or range): Datum: Flood Protection Facilities Describe-. �r Source Control Describe landuse: (comm./industrial landuse) Describe any structural controls: ,•'f % 2009 Surface Water Design Manual 3 1/9/2009 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Oil Control Other Drainage Describe: High -use Site: Yes ! No Treatment BMP; Maintenance Agreement: Yes 1 No with whom? Part.13 EROSION AND SEDIMENT CONTROL REQUIREMENTS MINIMUM ESC REQUIREMENTS Flow Control MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION Water Quality AFTER CONSTRUCTION n C `' �7t" �C� � LJ"Stabilize Exposed Surfaces ring Limits Cover Measures emove and Restore Temporary ESC Facilities ❑ Perimeter Protection Yclean and Remove All Silt and Debris, Ensure c Area Stabilization Operation of Permanent Facilities YSediment ❑ Flag Limits of SAO and open space Retention preservation areas LJSurface Water Collection ❑ Other ❑ ewatering Control LYJ Dust Control ❑ Flow Control Part 14 STORMWATER FACILITY DESCRIPTIONS Note: Include Facili Summa and Sketch Flow Control T e/Descri tion Water Quality Type/Description 12"Detention ❑ Infiltration ❑ Regional Facility ❑ Shared Facility ❑ Flow Control BMPs ❑ Other `' �7t" �C� ❑ filtration Wetpool ❑ Media Filtration ❑ Oil Control ❑ Spill Control ❑ Flow Control BMPs ❑ Other 2009 Surface Water Design Manual 1/9/2009 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 16 EASE MENTSTTRACTS Part 16 STRUCTURAL ANALYSIS ❑D . nage Easement LJ Cast in Place Vault Covenant ❑ Retaining Wall ❑ Native Growth Protection Covenant ❑ Rockery > 4' High ❑ Tract ❑ Structural on Steep Slope ❑ Other ❑ Other Vg— Part 17 SIGNATURE OF PROFESSIONAL ENGINEER I, or a civil engineer under incorporated into this w94 knowledg0the informs on supervision, have visited the site. Actual site conditions as observed were d the attached Technical Information Report. To the best of my vide ere is arcuta#e. 2009 Surface Water Design Manual 1/9/2009 71 f SE 9 th DI AhTl, ,,SE 98t1j,,St 6 Nk: 25W PC SE 8i 4. 0V 9 P SE lootl�, R-8 R� R c g L__L_AE_L22iU ;P 22n S[.�, c, CCU)) N E 241 ��iL a NEi 2fi t is N A z I 151 R W R-1 R R-1 nth- R i'Ah F at ........... R2 Rp' Oj 10 R I CD CA -CD C_ A op ZA _h F4A N c. FR,-? FA E5 9 T23N R51E E 1/2 ZONING - D 5 P/&TW TWMUCAL SMRM CM&06 4 T23N ME E 1/2 5304 S"17 -Z 1 y"��-----7jj, Fy, �T{eigh � }1� � I 'i' ,�> "�� • . �A <22 L = 965 ■ Pleasure 'B Point. .21 PC- az • r I �'f1kF AgD'C I g h ;r f i K A AkF BNy 2 3'2A �IcC, ,�� ��11 `�-�R`' I Bec p� O Ago< Ag j LM �//i in r ` ur v. Hills: _P T s AgC'; I U Ur c;, inA j 0a "• Be❑ I • II B '-44 ArnC: � 1 B Ev i ter_ ; 1MT .RpD v C� G k NeW J s X593 AgD : 3 M Y (- I �r �h4��� 1 EVC {seD •eC t . • B s ] �,AmC � •.l � � ASC r a Hh' t• .y AgQ H ' I ArC Y.pC EvC �� r Ads ay OVD--..- --�~-- - qtr � BMd A'BM I AgO ASC Na I ,p - M ! __ • E I AgC BMA i Ovq �k L' 1 605V. — N AgC W- a ---- '� F�" AgD ASC ��I 34 _ A$c IlI1 Ag5 J 1—.. ,J1,••• ` ��at- I �• /� II{ ': jl !nC AkF AkF ABC E p rig IA VEL AhFc N A U I k3aG EvG I ••• �P,1'r'1 I _ r+: tj� I - Gg .T• I �/ PITInA —1 - I y - 3i9 Cve BMy'l11 4. D !, BM'Is03 i n 6Up r ; R ABC` ,, ` 1IIIl!II �II I1 !I ��, :wk Sm• 1nC -..� .1 ``� I "b 1l EVC' nnn 'Ur '• _ AniC tel• S y�dC :r �i ��`'F] t�. 7railer ark d, � l)r^ I I •� �.'� t ��i.a,i , _ I�• T� j II _ �, .. � d.�M s.:, s C7 1 Bf? \�� 4. — L.'�' I �II �,�ki� < .�•• i�l ly.i=J�l'y--�+�1� I I`'ll �} iEYC a.'9r ���$� 1 � I �'!lt `t r. . 4.. P1a.,rr - , J'; fir; J IIS _,�_ V4----jtil_ 1�•_ �.f }L__. e r4sF, I J:E r•r '; Uh I - .,Ir - I.I �lC.•. Ill. OFF-SITE ANALYSIS The analysis contains information and data obtained through site visit observation, survey data and research of existing records provided by King County DDES. Task 1. Study Area Defmition and Maps The site is the situated west of Union Avenue NE. The surface runoff drains generally to the west.to a low area along the west portion of the site. The basin area including negligible off-site is calculated at 1.12 acres. Refer to Figure 5 for general site location. Task 2. Resource Review Based on a review of available resources, including the County's Sensitive Areas Map Folio (King County Department of Parks, Planning and Resources, 1990), the site and downstream system within a mile are characterized as follows: The drainage course from the site is directed east to existing storm system on Union Avenue NE. The flow is directed south along Union Avenue NE to Honey Creek crossing 1800 feet to the Honey Creek crossing located 150 feet north of NE Sunset Blvd. The flow is directed west following Honey Creek to approximately 1.5 miles connecting to May Creek and eventually into Lake Washington. i Based on a review of available resources, including the County's Sensitive Area Map Folio (King County Department of Parks, Planning and Resources, 1990), the site and downstream system within one mile from the site are characterized as follows: DDES Observatiion Report as provided by Bill Priest, dated September 27, 2007 • Floodplain/Floodway (FEMA) Maps -- the site is not within flood plain. • Erosion Hazard — the site is not classified as erosion hazard area • Landslide Hazard none on site • Seismic Hazard -- none on site • Coal Mine Hazard — none on site • USDA Soil Conservation Service Soil Survey • King County Assessor' Parcel Map Task 3. Field inspection The downstream analysis was conducted in the summer of 2014 assessing potential offsite drainage impact that may be associated with development of this project. The primary discharge locations from the project were evaluated, as well as the downstream system for approximately more 2200 feet downstream from the project site. Task 4. Drainage System Description and Problem Description There were no eroding or unstable side slopes for the ditches noted during this analysis in May of 2012. TASK 5: N LITIGATION OF EXISTING OR POTENTIAL PROBLEMS Conservation flow control standards are required based on the City's flow control applications. IV. FLOW CONTROL AND WATER QUALITY FACILITY ANAYLSIS AND DESIGN Flow control and water quality treatment for the project are subject to the requirements of the City of Renton amendment of 2009 King County Surface Water Design Manual.. We used the historic existing conditions for the development of the runoff calculations for Conservation Flow Control area. This is Level 2 flow control standard which matches historic duration's for % the 2 year through the 50 year peaks, and matches historic 2 year and 10 year peaks. Conservation flow control and enhanced basic water quality treatment are proposed. Existin2 Site H drolo Part A The existing conditions of the site were modeled as historic forested condition for purposes of stormwater flow control sizing. The area of the site that is being considered in this calculations is 1.12 acres with the existing frontage improvements already in place. Proposed, is a single-family development Basic Area Site Area Forest Refer to MAPA 1.12 Acres 1.12 Acres. Developed Site Hydrology Part B The area of the plat to be developed is 1.12 acres, to include asphalt paving, driveways, houses and landscaping. The frontage along Union Avenue NE is fully developed. The plat drainage basin, new added houses, asphalt paving and driveways will be directed through a detention/wet-open pond for flow control and Water Quality measures. The roof runoff from the new houses will be collected in catch basin pick-ups and directed to the conveyance system. Post -Developed Conditions For this Level 2 analysis of the 20 lot preliminary plat we will use the following areas: per Section 32.2.1 KCSWDM). Total Area of homes and driveways (5x2500) 12,500 SF = 0.28 Ac Total Asphalt Area 3,500 = 0.08 Ac Total Impervious = 0.36 AC. Pervious Lawn & Landsca = 0.76 AC Total Basin in developed condition = 1.12 Acres The above information will be used in the King County KCRTS computer program to establish the existing and proposed time series for the peak flow analysis_ Performance Standards (C) The conveyance system is designed with sufficient capacity to convey and contain the 25 -year peak flow (1.2.4.1 KCS""). Rational method is used to check the conveyance capacity of the design storm water system using the developed 25 -year peak flow. Conservation Flow Control Conservation Flow Control applies the historic Level 2 flow control standard, which matches historic duration for 50% of the 2 -year through 50 -year peaks and matches historic 2- and 10 -year peaks. Flow Control System (D) The total storage volume required is 10,326 cu. Ft. The detention/wet vault dimensions provided is sufficient to hand needed storage Water Quality Systern (E) The wet pond is sized to provide water quality storage. i MAP Imo' �^.Ji - �-s '� "— - ��,,. . .1,- LL 3 � i�:'� �--��" � `--� _ L • ' f1,3�,,, j ,.`` - � pC'`�,I t` d7xrE ST .�l1Y'fTd )iEffJh#SPalk, _kfE 25TH ?. (.ic ��F T' jl� i r�t19fl Tl4 SF I xy-t AFS?. fl'CT {`Y- Yt r- .' } I ( if�� i }j ❑ 1 '1 { }�jyiG ► {`,J, ,• '•' 4 ' x{7.:1 ,_; � `� e `- i L'� rl 3� C '" ?�rm 2e7'1ti. ST 144 23R5P,(r NE23RD ar'T 1 'yam.` - NS22''4LT+'y w - 's r-{ z t 1£D t R- ST t tti I r<'.7aT-P!�''1T 1 ;;�iar'Ta.SY' - �_�1->. KY�2iST.� t t r�� ( ? � t�'e��ryl^� ) yj 7 - -._. � i1��i •4 ,tr �T `r�Sl.- ^ {SdST} P �'J' f4f� fll Ei 7 J tt%� ,t �,-h *^•"r r -- _ `'c tr [+•4 � '�) Ls Y'E mTW.7r 'JI '1'�. 1YrM ST, tt7iFG35c�;�-. —C s �;i fa_37fkcg- ' NE '7T44 sT Renion y �wr r J •. 1 f� l�Ir ; �. ti t t(y _._4 Q H' T21+1 STF; ti f= IF' ;fir 'r" '� � rt l � 7i � ' I '� =_—�.i � • ti `-' '� _ � I i !' � ,� � �r ' 1riTN tzLrf i Wr i fir. j II.- ftiifT4'sT J �, f r F �3 I lra T1T�F5T 'U I lE iTT�f`y , iNr _f-4 i `• �, {{�'�F1f1 �'tp_!.? r, � r� �'�fE• � �� 1 r ��, I If iE y I7 �T rrr 1 j ' t• -Nt tOTMtT `- 'I ' �`' 2YE 1pTh E T , 17" I +Y 1 6� ZIP �, 1h \..S N*n lOTal LN _-, a '�.,'•7 t� I• 7 - ,� 't 1r ! .w Nr1DT!iST o-- f j C. i_ P j}5,i i ,�.���iE Z {-- til =.1.f Q-` N='9Trl� •r41I":CI ST L Nr S _- � `4 �'� `�4 - '~ �liiwan7s-P2rit - Ren#art• '`� r� 1 ° I"�,,{ j rl�'I'��. — (C( tB icing Cain ty 't'`� j'� r D $65ft€ The -irdormation.induded on this map. has teen rnnpiled by FingCourdy staff from:a variety of sources and is subject to change without notice. Pang County makes.no repres4rrlalions or warrmaties, expmsa a implied. ss to accuracy s�mgleieness. timeliness a rights to tfra use af.such infurmahon. This document is not intended fa use as a survey product. King County shall.tot be liable for any general, speaat, indirect, Incidental, or consequential a A- darteges in0ludlrtg, lrut not limited to, lost revenues or Tos-profrta resultirx� from the use or -misuse of the iritorri,ation contained wMis map. My sale of Kin County this map ar,information on ibis map is prohibited eicepf tri -written pemvssmn of King County. pate:7/lr41d Source: King County TAMP- Property Information(httpJw.wr.Tnetinkc.govfGlSrMAP) - Z?O A1S7 E4 W_ R f � I f� KUSHAL.TXT KCRTS Command ------------- CREATE a new Time series ------------------------ Production of Runoff Time Series Project Location : Sea -Tac Computing Series : PREDEV.tsf Regional scale Factor : 1.00 Data Type : Reduced Creating Hourly Time Series File Loading Time series File:C:\KC_SWDM\KC_DATA\STTF60R.rnf Till Forest 1.12 acres -------------- Total Area 1.12 acres Peak Discharge: 0.090 CFS at 9:00 on ]an 9 in Year 8 storing Time series File:PREDEV.tsf Time series Computed KCRTS Command ------------- CREATE a new Time Series ------------------------ Production of Runoff Time Series Project Location sea -Tac Computing Series DEV.tsf Regional Scale Factor : 1.00 Data Type Reduced Creating Hourly Time series File Loading Time series File:C:\KC_sWDM\KC_DATA\STTG60R.rnf Till Grass 0.76 acres Loading Time Series File:C:\KC_SWDM\KC—DATA\STEI60R.rnf Impervious 0.36 acres -------------- Total Area 1.12 acres Peak Discharge: 0.331 CFS at 6:00 on fan 9 in Year 8 storing Time series File:DEV.tsf Page 1 Flow Frequency Analysis Time Series File:predev.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates --- Flow Rate Rank Time of Peak (CFS) 0.331 Period 100.00 0.071 2 2/09/01 18:00 0.019 7 1/06/02 3:00 0.052 4 2/28/03 3:00 0.002 8 3/24/04 20:00 0.031 6 1/05/05 8:00 0.054 3 1/18/06 20:00 0.046 5 11/24/06 4:00 0.091 1 1/09/08 9:00 Computed Peaks 50.00 Flow Frequency Analysis Time Series File:dev.tsf Project Location:Sea-Tac ---.Annual Peak Flow Rates --- Flow Rate Rank Time of Peak (CFS) 0.331 Period 100.00 0.155 4 2/09/01 2:00 0.112 7 1/05/02 16:00 0.190 2 2/27/03 7:00 0.104 8 8/26/04 2:00 0.129 6 10/28/04 16:00 0.163 3 1/18/06 1.6:00 0.152 5 11/24/06 3:00 0.331 1 1/09/08 6:00 Computed Peaks 50.00 -----Flow Frequency Analysis------- Return - - Peaks - - Rank Return Prob (CFS) 0.331 Period 100.00 0.091 1 100.00 0.990 0.071 2 25.00 0.960 0.054 3 10.00 0.900 0.052 4 5.00 0.800 0.046 5 3.00 0.667 0.031 6 2.00 0.500 0.019 7 1.30 0.231 0.002 8 1.10 0.091 0.084 50.00 0.980 Flow Frequency Analysis------- - - Peaks - - Rank Return Prob (CFS) Period 0.331 1 100.00 0.990 0.190 2 25.00 0.960 0.163 3 10.00 0.900 0.155 4 5.00 0.800 0.152 5 3.00 0.667 0.129 6 2.00 0.500 0.112 7 1.30 0.231 0.104 8 1.10 0.091 0.284 50.00 0.980 Flow difference between pre-dev and post-dev is 0.331 - 0.091 = 0.24 cfs. Detention is required First Interval = 50S of 2yr = 0.5 * 0.031 = 0.016 Interval Size = (50yr-50$ of 2yr)/35 (0.085 - 0.016)/35 = 0.021 Qmax = 4/3 of 2yr 1.33 * 0.016 = 0.021 w ° 10-0 10-` 10-3 0 1-` 10 10 Probability Exceedence Retention/Detention Facility Type of Facility: Detention Pond Side Slope: 3.00 H:lV Pond Bottom Length: 95.00 ft Pond Bottom Width: 45.00 ft Pond Bottom Area: 4275. sq. ft Top Area at 1 ft. FB: 7119. sq. ft 0.163 acres Effective Storage Depth: 2.00 ft Stage 0 Elevation: 0.00 ft Storage Volume: 10326. cu, ft 0.237 ac -ft Riser Head: 2.00 ft Riser Diameter: 12.00 inches Number of orifices: 2 Full Head Pipe Orifice # Height Diameter Discharge Diameter (f t) (in) (CFS) (in) 1 0.00 0.76 0.022 2 1.20 1.40 0.048 4.0 Top Notch Weir: None Outflow Rating Curve: None Stage Elevation Storage Discharge Percolation Surf Area (ft) (ft) (cu. ft) (ac -ft) (cfs) (cfs) (sq. ft) 0.00 0.00 0. 0.000 0.000 0.00 4275, 0.01 0.01 43. 0.001 0.001 0.00 4283. 0.02 0.02 86. 0.002 0.002 0.00 4292. 0.03 0.03 129. 0.003 0.003 0.00 4300. 0.04 0.04 172. 0.004 0.003 0.00 4309. 0.05 0.05 215. 0.005 0.003 0.00 4317. 0.06 0.06 258. 0.006 0,004 0.00 4326. 0.16 0.16 695. 0.016 0.006 0.00 4410. 0.26 0.26 1140. 0.026 0.008 0.00 4496. 0.36 0.36 1594. 0.037 0.009 0.00 4582. 0.46 0.46 2057. 0.047 0.011 0.00 4669. 0.56 0.56 2528. 0.058 0.012 0.00 4757. 0.66 0.66 3008. 0.069 0.013 0.00 4845. 0.76 0.76 3497. 0.080 0.014 0.00 4934. 0.86 0.86 3995. 0.092 0.015 0.00 5024. 0.96 0.96 4502. 0.103 0.015 0.00 5115. 1.06 1.06 5018, 0.115 0.016 0.00 5206. 1.16 1.16 5543_ 0.127 0.017 0.00 5298. 1.20 1.20 5756. 0.132 0.017 0.00 5335. 1.21 1.21 5809. 0.133 0.018 0.00 5344. 1.23 1.23 5916. 0.136 0.019 0.00 5363. 1.24 1.24 5970. 0.137 0,021 0.00 5372. 1.26 1.26 6077. 0.140 0.024 0.04 5391. 1.27 1.27 6131, 0.141 0.028 0.00 5400. 1.29 1.29 6239. 0.143 0.032 0.00 5419. ---------------------------------- Route Time Series through Facility Inflow Time Series File:dev.tsf Outflow Time Series File:rdout Inflow/Outflow Analysis Peak Inflow Discharge: 0.331 CFS at 6:00 on Jan 9 in Year 8 Peak Outflow Discharge: 0.069 CFS at 14:00 on Jan 9 in Year 8 Peak Reservoir Stage: 1.96 Ft Peak Reservoir Elev: 1.96 Ft Peak Reservoir Storage: 10094. Cu -Ft 0.232 Ac -Ft 1.30 1.30 6294. 0.144 0.035 0.00 5428. 1.32 1.32 6402. 0.147 0.036 0.00 5447. 1.42 1.42 6952. 0.160 0.043 0.00 5540. 1.52 1.52 7511. 0.172 0.049 0.00 5635. 1.62 1.62 8079. 0.185 0.054 0.00 5730. 1,72 1.72 8657. 0.199 0.059 0.00 5826. 1.82 1.82 9244. 0.212 0.063 0.00 5923. 1.92 1.92 9841. 0.226 0.067 0.00 6021. 2.00 2.00 10326. 0.237 0.070 0.00 6099. 2.10 2.10 10941. 0.251 0.381 0.00 6198. 2.20 2.20 11566. 0.266 0.947 0.00 6297. 2.30 2.30 12200. 0.280 1.680 0.00 6397. 2.40 2.40 12845. 0.295 2.470 0.00 6498. 2.50 2.50 13500. 0.310 2.750 0.00 6600. 2.60 2.60 14165. 0.325 3.020 0.00 6702. 2.70 2.70 14840. 0.341 3.260 0.00 6805. 2.80 2.80 15526. 0.356 3.480 0.00 6909. 2.90 2.90 16222. 0.372 3.680 0.00 7014. 3.00 3.00 16929. 0.389 3.880 0.00 7119. 3.10 3.10 17646. 0.405 4.070 0.00 72.25. 3.20 3.20 18374. 0.422 4.250 0.00 7332. 3.30 3.30 19113. 0.439 4.420 0.00 7439. 3,40 3.40 19862. 0.456 4.580 0.00 7547, 3.50 3.50 20622. 0.473 4.740 0.00 7656. 3.60 3.60 21393. 0.491 4.900 0.00 7766. 3.70 3.70 22175. 0.509 5.050 0.00 7876, 3.80 3.80 22968. 0.527 5.190 0.00 7987. 3.90 3.90 23773. 0.546 5.330 0.00 8099. 4.00 4.00 24588, 0.564 5.470 0.00 8211. Hyd Inflow Outflow Peak Storage Target Calc Stage Elev (Cu -Ft) (Ac -Ft) 1 0.33 0.09 0.07 1.96 1.96 10094, 0.232 2 0.16 ******* 0.06 1.75 1.75 8852, 0.203 3 0.19 ******* 0.05 1.48 1.48 7267. 0.167 4 0.15 ******* 0.05 1..48 1.48 7297. 0.168 5 0,16 ******* 0.04 1.33 1.33 6440. 0.148 6 0.09 ******* 0.02 1.22 1.22 5853. 0.134 7 0.11 ******* 0.01. 0.95 0.95 4433. 0.102 8 0.10 ******* 0.01 0.47 0.47 2104. 0.048 ---------------------------------- Route Time Series through Facility Inflow Time Series File:dev.tsf Outflow Time Series File:rdout Inflow/Outflow Analysis Peak Inflow Discharge: 0.331 CFS at 6:00 on Jan 9 in Year 8 Peak Outflow Discharge: 0.069 CFS at 14:00 on Jan 9 in Year 8 Peak Reservoir Stage: 1.96 Ft Peak Reservoir Elev: 1.96 Ft Peak Reservoir Storage: 10094. Cu -Ft 0.232 Ac -Ft Flow Duration from Time Series File:rdout.tsf Cutoff Count Frequency CDF Exceedence Probability CFS 0.001 37097 60.497 60.497 39.503 0.395E+00 0.003 4285 6.988 67.485 32.515 C.325E+00 0.004 4720 7.697 75.183 24.817 C.248E+00 0.006 4699 7.663 82.846 17.154 0.172E+OC 0.008 2820 4.599 87.445 12.555 0.126E+00 0.009 2892 4.716 92.161 7.839 0.784E-01 0.011 1017 1.659 93.819 6.181 0.618E-01 0.013 1376 2.244 96.063 3.937 0.394E-01 0.014 724 1.181 97.244 2.756 0.276E-01 0.016 905 1.476 98.720 1.280 0.128E-01 0.018 413 0.674 99.393 0.607 0.607E-02 0.019 65 0.106 99.499 0.501 0.501E-02 0.021 19 0.031 99.530 0.470 0.470E-02 0.023 34 O.C55 99.586 0.414 0.414E-02 0.024 24 0.039 99.625 0.375 0.375E-02 0.026 7 0.011 99.636 0.364 0.364E-02 0.028 8 0.013 99.649 0.351 0.351E-02 0.029 17 0.028 99.67'1 0.323 0.323E-02 0.031 13 0.021 99.698 0.302 0.302E-02 0.033 9 0.015 99.713 0.287 0.287E-02 0.034 4 0.007 99.720 0.280 0.280E-02 0.036 20 0.033 99.752 0.248 0.248E-02 0.038 20 0.033 99.785 0.215 0.215E-02 0.039 24 0.039 99.824 0.176 0.176E-02 0.041 13 0.021 99.845 0.155 0.155E-02 0.043 16 0.026 99.871 0.129 0.129E-02 0.044 10 0.016 99.887 0.113 0.113E-02 0.046 16 O.C26 99.914 0.086 0.864E-03 0.048 12 0.020 99.933 0.067 0.669E-03 0.049 4 0.007 99.940 0.060 0.603E-03 0.051 3 0.005 99.945 0.055 0.554E-03 0.053 2 0.003 99.948 0.052 0.522F-03 0.054 8 0.013 99.961 0.039 0.391E-03 0.056 8 0.013 99.974 0.026 0.261E-03 0.058 4 0.007 99.980 0.020 0.196E-03 0.059 4 0.007 99.987 0.013 0.130E-03 Duration Comparison Anaylsis Base File: predev.tsf New File: rdout.tsf Cutoff Units: Discharae in CFS -----Fraction of Time-- - ---- - --Check of Tolerance ------- Cutoff Base New $Change Probability Base New .Change There is no positive excursion There is no negative excursion w 10 -t) 10 1` 10-11 10-Z 1 f 10 Probability Exceedence V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN Runoff from the developed site is carried through underground series of pipes directing the flows from the site (refer to attached sub -basin maps) to the detention facility situated on the west portion of the site. The 100 -year and 25 -year developed runoff from the site calculated to determine capacity of pipe from its initial point to its discharge point within the pond_ The proposed storm system consists of one 1.2 - inch pipe (double wall N-12 pipe). The formula used to determine flow is the Rational Method Equation Qr--CIrA Qr — peak flow for a storm return frequency r C — rainfull runoff coefficient Ir — peak rainfall intensity (inch/hr) for a storm return frequency r A — Drainage subbasin Fourth column of Pipe Report - A Fifth column of Pipe Report - C Eight column of Pipe Report - Ir Ir is determined from the formula 1r=-(Pr)(ir) Pr total precipitation for a 24 -hr duration is found on the Isopluviam Maps Figurre 3.2.1 A to D it — the unit peak rainfall intensity derived from the following formula it = (ar)(T) to the power of (-br) ar — values determined from Table 3.2.1.8 for a 25 -yr & 100 -yr storm return Br — values determined from Table 3.2.1.B for a 25 -yr & 100 -yr storm return T — time of concentration — the short overland path, a 6.3 minute time is used for initial time T Calculations will be providedf VI. SPECIAL REPORTS AND STUDIES Geotechnical Report- by Georesources, Attached to this xeport Ph 253-896-1011 Fx 253-896-2633 Mr. Kushal Varma 2609 NE 5" Court Renton, WA 98056 (206) 353-3168 GeoResources, LLC 5007 Pacific Hwy E., Ste. 16 Fife, Washington 98424 May 23, 2014 Geotechnical Infiltration Feasibility Letter 2401 Union Ave NE Renton, Washington PN: 0423059077 Job No. Varma.UnionAvNE.IR INTRODUCTION & SCOPE This report addresses the feasibility of stormwater infiltration for the proposed residential short plat to be located at 2001 Union Avenue NE in Renton, Washington. We understand that you propose to construct a new residence on each of the new lots. We further understand that access to the lots will be a shared driveway along the south portion of the site. We also understand that you propose to infiltrate the stormwater from the proposed roofs on each lot, where feasible. The King County Surface Water Design Manual (2009) requires soil logs to confirm subsurface conditions and to determine the feasibility of stormwater infiltration at the site. On May 16, 2014, we monitored the excavation of five test pits across the site and logged the subsurface conditions encountered. Soil samples were collected and a representative sample tested for grain size distribution. The purpose of our services was to evaluate the surface and subsurface conditions at the site as a basis for developing and providing geotechnical stormwater recommendations for the proposed development. Specifically, our scope of services for the project included the following: 1. Visiting the site and conducting a geologic reconnaissance to assess the site's soil, groundwater and slope conditions; 2. Exploring the subsurface conditions across the site by monitoring the excavation of test pits; 3. Completing laboratory grain size analysis for representative site soils; and 4_ Providing infiltration rates for the stormwater facilities, as appropriate. SITE CONDITIONS Surface Conditions The site is situated in an area of established residential development in Renton, Washington. The site is currently developed with an existing single family residence with a basement configuration. The site is rectangular in shape, measures approximately 330 feet by 135 feet, and encompasses 1.02 acres. The ground surface on the site generally slopes from the east to the west at inclinations of less than 10 percent. Total topographic relief on the site is on the order of 5 vertical feet. Site Soils and Geologic Conditions The USDA Natural Resource Conservation Service (NRCS) Web Soil Survey for King County maps the soils in the area of the site as Alderwood gravelly sandy loam Varma, UnionAveNE.I RR May 23, 2014 Page 2 (Ag C). The Alderwood soils are derived from glacial till that form on 6 to 15 percent slopes and are listed as having a "slight to moderate" erosion hazard. The near surface soils at the site have been disturbed by natural weathering processes that have occurred since their deposition. The geologic map for the site area indicates the site is situated in an area of glacial till (Ogt). An excerpt from the geologic map is included at Figure 4. Subsurface Conditions Subsurface conditions were evaluated by excavating five test pits across the site. The near surface soils consisted of 0 to 112- to 1 -foot of topsoil with numerous roots over medium dense fine grained sand with silt and varying amounts of small gravel. We interpret these sandy soils to represent the weathered sandy outwash deposits. At depths of 3 to 4 feet, we encountered a dense indurate silty sand with gravel, representative of glacial till. The indurate glacial till was observed to the full depth explored in all our test pits- The observed stratigraphy generally confirmed the mapped stratigraphy. The locations of our explorations are included on the Site Plan as Figure 2. The soils encountered were visually classified in accordance with the unified Soil Classification System (USCS), a copy of which is attached as Figure 5. The Test Pit Logs are attached as Figures 6a and 6b - Laboratory Analysis Our geotechnical laboratory tests were completed on a representative soil sample collected from the test pits at the site. The tests performed included a grain size analysis, cation exchange capacity and organic content. Our grain size laboratory test results indicated that the soils on the site consist of sand with silt and minor gravel. The attached laboratory testing sheets graphically present these results. Copies of the grain size and cation/organic tests are attached. TABLE 1 LABORATORY TEST RESULTS FOR ON-SITE SOILS SlltlClay Content Gravel Content Depth - Soil Type percent 2 to 3,5 feet 23.0 Outwash Sand wl Silt Sand Content 45.0 1 27-0 The minimum required CFC is 5 mEq/1009 in order for soils to be used as a treatment layer beneath a water quality facility, such as porous pavement. The cation exchange capacity for the sample was 15.7 Na, mEq/100g and the organic content was 4.4% dry weight, which meets the requirement. A porous pavement section can be provided at your request - Groundwater Conditions No evidence of seasonal groundwater such, as mottling, was observed at the upper contact of the glacial till at 3 to 4 feet below the ground surface in the test pits at the time of excavation. Based on the nature of the near surface soils, we anticipate fluctuations in the local groundwater levels will occur in response to precipitation patterns, general development in the area, and site utilization. Va rma. U nionAveNE.I RR May 23, 2014 Page 3 CONCLUSIONS AND RECOMMENDATIONS Based on the soils encountered in our explorations, laboratory analysis, and our engineering analysis, we conclude that limited infiltration of storm water is feasible in the shallow on site soils encountered on the site. The shallow soils appear to have adequate permeability and storage capacity to infiltrate a portion of the stormwater on the site, provided adequate design, construction and maintenance practices are used. We recommend that pervious pavement or pavers be considered for the soared driveway and parking areas of the residences_ In filtration trenches or dry wells may be utilized for the roof runoff at the site. Specific geotechnical recommendations for earthwork and building development may be provided upon request. Stormwater Infiltration We recommend that pervious pavement or pavers be utilized for the shared driveway and parking areas of the residences_ This will reduce the amount of required infiltration via trench systems. For the roof systems, storm water infiltration rates were determined in accordance with the King County Surface Water Design (2009) (KCSWDM). We performed a sieve analysis on a representative soil sample collected from the test pits at the site. We expect that the trenches will need to be relatively shallow, 2.5 to 3 feet bgs (below ground surface) to provide the minimum separation from the underlying till soils. Based on the results of our sieve analysis and our experience, the sand with minor silt and gravel are comparable to "medium sand" (Soil Type 2B) to `fine sand, loamy sand" (Soil Type 3). According to the KCSWDM section 4.5.1, the "fine sand, loamy, soils related to 60 feet per 1,000 sq fit of roof area for limited infiltration in gravel filled trenches. The following formula is used to calculate the length of roof downspout trenches: L= (Ar/1000)(1)(k) 1 heAr is the area of the roof, I is the length of the trench required per soil type, and k is the regional scale factor. The scale factor for the subject site is 1. Appropriate design, construction and maintenance measures will be required to ensure the infiltration rate can be effectively maintained over time. It should be noted that special care is required during the grading and construction periods to avoid fine sediment contamination of the infiltration system. This may be accomplished by using an alternative storm water management location during grading and construction activities. All contractors working on the site (builders and subcontractors) should be advised to avoid "dirty' stormwater flowing to the site's stormwater system during construction and landscaping activities at the site. Concrete trucks should not be washed or cleaned on-site. Suspended solids could clog the underlying soil and reduce the infiltration rate for the system_ To reduce potential clogging of the infiltration systems, the infiltration system should not be connected to the stormwater runoff system until after construction is complete and the site area is landscaped, paved or otherwise protected. Temporary systems may be utilized through construction. Periodic sweeping of the paved areas will help extend the life of the infiltration system. Particle Size Distribution Report c c o 0 0 Q m o V N c E 4Z 100 i i I 1 1 1 I I I V I I I SQ I I I I I I I I I I I! I€ 70 I I 1 1 1 1 1 I I I ! I I I Z so z 50LU I I V I I I I I I l i CJ I I I I I 1 1 i I I I I I UJ 11.i ' 30 1 I I I I I I I I I I I I I I I l l l l l 20 I k i l l 1 1 1 I 1 1 1 1 1 Ui 1a a°J I 1 1 1 1 1 I I I I I I I a� M0 100 10 1 0.1 0.01 0.001 GRAIN SIDE - %Gravel 'fe Sand � " Goarse, Medium FI., i (D > 1 0 1 16 1 12 j 1$ W � W 0 0 5 a 0 C C D c a� w a) ro o m = as � N UJ a u x N Cx o E S-- Ed STEVE SIZE PERCENT FINER SPEC.' PERCENT PASS? (X=NO) 314 100 112 95 PL.= L1_= 318 91 Coefficients #4 84 k D50= 03516 #10 72 D1 Cu= #20 63 Classification #40 54 #60 43 #100 34 #200 27 � [na specification provided} o N w � p Sample Number: 090840 � > _ GeoResources, LLC m m N Fife, WA % Flnes Fine silt 27 27 Remarks Date: Client: Varma-Kushal Project: Union Ave. NF Prosect No: Varma- _Figure Tested By:Timothy Bergstrom Checked By: Brad 8-Lgersta#f Materiai Descri tion Brown Silty Sand with Trace Gravel Natural Moisture = 19_75% Atte_rberq Limits PL.= L1_= P1= Coefficients Dg0= 8.4038 Dgr,= 5.3837 1000= 0.6669 D50= 03516 D30= 0.0975 D1 5-- _Di0= D1 Cu= Cc= Classification USCS= AASHTO= Remarks Date: Client: Varma-Kushal Project: Union Ave. NF Prosect No: Varma- _Figure Tested By:Timothy Bergstrom Checked By: Brad 8-Lgersta#f V arm a. U n i onAveN E. I R R May 23, 2014 Page 4 We trust this is sufficient for your current needs. Should you have any questions, or require additional information, please contact us at your earliest convenience. Respectfully submitted, GeoResources, LLC Brad Biggerstaff, LHG Principal BPB:bpb DodD. Varma.UNWAve.IR Attachmnts: Figure t: Site Vicinity Map Figure 2: Exploration Map Figure 3: MRCS Saks Map Figure 4: Getlogy Map Figure 5: Unified Sail OassiflcatiOrl System Figare 6: Test Pit Logs Grain Size Analyses (2) ' - rrzrr,lsF N! IH sr, NE:2STHST �� I lti �T_..C reek Parte -County `4tH F;` N62,rri P NE 78TH CT ui 59c'TiA r- 2 Si 28TH ST 1+E 2 H P_ \ I_ yy ul H'S 2}T gT a S9 947u SA z i i _ 3� NG2-r'T45.r� N2Krt(STNc2TH 97 \ Z 7 w u `C2,jR3 5T o �..N A'Q zl yJ N_24TO ST .1; < g f; a NE 27TH P_ o ?1E25FHPL ' NS 25TH CT j NE24TH CT y' S U r TIE2IR❑ P1. ?tE22,4}PCr !j _ AA w �' k622Hp ST w 7 srr2tsrsr r - 1 H[ f9Tlr Y yy Cy 4f > y' S U r NLATs1 r M Krwa.ni.7 park - Reaton z - 1 H[ f9Tlr y IJ __r{i1:-- ... ..... 1 faT.-.Tii ST L4 � s: Ir --I HE 17rir P1 ��� - ------ kYE iLTIl ST -_- .._ `'_ - .. ;i a L NE 17r+r ST -..l •' leE kiTH ST %VPd V Renta n y, p Y NE 13Ti1 p- 0. 4 n t 1 H- lrli PL a H=tiTlr ST m s N8 ?mak Ct 7' � NE 14rii PL NZ 1dTlI ST �' ' a _ r i' NE 1"m vi rr rt R H� IOrH ST ; ZZ N_9TTIP' Y N_ iGT,y ST rr, �jgcH : ZF M H_4TIIST m. 121r7eKngCVUhty - 'I Approximate Site Location (map created from Pierce County Public GIS website) GeoResources, LLC 5007 Pacific Highway East, Suite 16 Fife, Washington 98424 Phone: 253-896-1011 Fax: 253-896-2633 Not to Scale Site Vicinity Map 2001 Union Avenue NE Renton, Washington Joh ID: VarmaK.NUnionAve.F May 2011 Figure 1 > c NE9T4 ST NLATs1 M Krwa.ni.7 park - Reaton z - 1 yam, rn y IJ __r{i1:-- ... ..... 1 faT.-.Tii ST Nom_ Yr LTH ST i - ------ _ -_- .._ `'_ - .. ;i a 111 16 Ott N_7rJf CT _.-. 121r7eKngCVUhty - 'I Approximate Site Location (map created from Pierce County Public GIS website) GeoResources, LLC 5007 Pacific Highway East, Suite 16 Fife, Washington 98424 Phone: 253-896-1011 Fax: 253-896-2633 Not to Scale Site Vicinity Map 2001 Union Avenue NE Renton, Washington Joh ID: VarmaK.NUnionAve.F May 2011 Figure 1 U Not tD Scale May 2014 Figure 2 —MN 4. A— wo _� EPP IF 71 ' Tt. , A hi 7 or J.��` Y �7 T.,4 d. MIR -.5 Fll.: 1pon', 4; ,a., It- "AR: —.0m '! 71 A) !F9 le SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP GROUP NAME SYMBOL GW WELL -GRADED GRAVEL, FINE TO COARSE GRAVEL GRAVEL CLEAN GRAVEL GP POORLY -GRADED GRAVEL COARSE GRAINED SOILS More than 50% Of Coarse Fraction GRAVEL GM SILK GRAVEL Retained on WITH FINES No. 4 Sieve GC CLAYEY GRAVEL SAN❑ CLEAN SAND SW WELL -GRADED SAND, FINE TO COARSE SAND Adore than 50°h Retained on SP POORLY -GRADED SAND No. 200 Sieve More than 50% Of Coarse Fraction SAND SM SILTY SAND Passes WITH FINES No, 4 Sieve SILT AND CLAY INORGANIC SC ML CLAYEY SAND SILT FINE CL CLAY GRAINED SOILS Liquid Limit Less than 50 ORGANIC OL ORGANIC SILT, ORGANIC CLAY SILT AND CLAY INORGANIC MH SILT OF HIGH PLASTICITY, ELASTIC SILT CH CLAY OF HIGH PLASTICITY, FAT CLAY More than 50 Passes ORGANIC OH ORGANIC CLAY, ORGANIC SILT No. 200 Sieve Liquid Limit 50 or more HIGHLY ORGANIC SOILS PT PIAT SOIL MOISTURE MODIFIER& NOTES: Field is based on visual examination of soil Dry- Absence of moisture, dry to the touch 1. classification in general accordance with ASTM D2488-90. Moist- Damp, but no visible water 2. Soil classification using laboratory tests is based on Wet- Visible free water or saturated, usually soil is ASTM D2487-90. obtained from below water table 3. Description of soil density or consistency are based on interpretation of blow count data, visual appearance of soils, and or test data. GeoResources, LLC 5007 Pacific Hwy. E, Ste 20 Fife, Washington 98424-2648 Ph. 253-896-1011 Fx. 253-896-2633 SOIL CLASSIFICATION SYSTEM FIGURES Test Pit TP -1 Location: South central portion of site Depth feet Soil Type Soil Description 0 - 0.3 Sod/TS 0.3 4.5 SP Org Brn SAND wl si, occ. gravel (loose to med. dense, moist) 4.5 - 5.0 SM Gry brown silty SAND w/ gravel, occ. cobbles (v. dense, moist) (Glacial Till?) Terminated at 5 feet below ground surface. No caving observed. No groundwater seepage or mottling observed_ Test Pit TP -2 Location: Southwest portion of site Depth (feet) Soil Type Soil Description 0 Q,5 Sod/Dark brown sdyTS 0.5 - 4.0 SP frown SAND w/ minas silt, occ gravel (loose to medium dense, moist) 4.0 - 4.5 SM Gry brown silty SAND w/ gravel, cobbles (v. dense, moist) Terminated at 4.5 feet below ground surface_ Moderate sidewall caving observed to full depth explored. No groundwater seepage or mottling observed_ Test Pit TP -3 Location: Southwest c of site Depth (feet) Soil Type Soil Description 0 - 0.3 SodITS 0.3 - 1.0 SM Dk Brn si SAND w/ organics (loose, damp) 0.3 - 3.5 SP Org Brn SAND w/ si, occ. gravel (loose to med. dense, moist) 3.5 4.0 Gry brown silty SAND w/ gravel, occ. cobbles (v. dense, moist) (Glacial Till?) Terminated at 4 feet below ground surface. No caving observed. No groundwater seepage or mottling observed. GeoResources, LLC 5007 Pacific Highway East, Suite 16 Fife, Washington 984.24 Phone: 253-896-1011 Fax: 253-896-2633 Test Pit Logs Proposed Single Family Residence 6610 South Tyler Tacoma, Washington JOB# Ben jam! nRyan,STy(er.SFR.TP 1 May 2014 1 Figureha Test Pit TP -4 Location: NW portion of site Depth Meet Soil Type Soil Description 0 0.3 Sod/TS 0.3 - 3.5 SP Org Brn SAND wl si, occ. gravel (loose to med. dense, moist) 3.5 - 4.0 SM Gry brown silly SAND w/ gravel, occ. cobbles (v_ dense, moist) (Glacial Till?) Terminated at 4 feet below ground surface. No caving observed. No groundwater seepage or mottling observed. Test Pit TP -5 Location: Southwest portion of site _Depth (feet) Soil Type Soil Description 0 - 0.5 Sod/Dark brown sdy TS 0.5 - 4.5 SP Brown SAND w/ minor silt, occ gravel (loose to medium dense, moist) 4.5 - 5.0 SM Gry brown silty SAND w/ gravel, cobbles (v. dense, moist) Terminated at 4.5 feet below ground surface. Moderate sidewall caving observed to full depth explored. No groundwater seepage or mottling observed. By:BPB May 16, 2014 GeoResources, LLC 5007 Pacific Highway f=ast, Suite 16 Fife, Washington 98424 Phone: 253-896-1011 Fax: 253-896-2633 Test Pit Logs Proposed Single Family Residence 6610 South Tyler Tacoma, Washington JOB# varma.UnlonAve_IR May 2014 Rgure6b SPECTRA Laboratories 2221 Ross Way ° Tac ma, WA 98421 • (253) 272-4850 • Fax (253) 572-9838 www_spwtra-Iab_cnm 05/20/2014 Geo Resources, LLC 5007 Pacific Hwy. E Suite 16 Fife, WA 98424 Analyte Organic Matter Cation Exchange Capacity SPECTRA LABORATORIES Steve Hibbs, Labora ory Manager a6fmkw Project: Varma, Kushal-Union Ave NE Client 1D; 090839 TP -1 Sample Matrix.: Soil Date Sampled: 05/15/2014 Date Received: 05/15/2014 Spectra Project: 2014050454 Spectra plumber: 1 Result Units Method 4.4 wt. % Dry ASTM D-2974-13 15.7 Na, mEq/ 1008 SW846 9081 Page 9 of 9 >' cl [IiLU z 0 moa z Q ff�� Vn Q U H m m x0 -H JI A4N w V a b J LJ fl 0~ wp O " Q Z o rn La icz Q J-HJLMWX3i9 V5 � X319 0 CL Z r U V • /�y � � Chi C N cl U cs�(Jd CCS hw L (� �U� ta, N N V �J r� y OJt03dS) SO[IOS 009 INIOd HSV1f X03/XOIIX1 SY06IA�D6 Hd � (Aim5dS) SIVi3W dloi z E V140H 8IV13W 43101 w („4d103dS) SIVi3W IVIOi Q 81lI0L3 S-1vi3W IVLD-L � SOd 8091ESOE z VNd/HVd DZU Q VOA [k'43S SZ9-WG Q SiNDAOS bOIHO 09EE Von MgMgU Z (903)1N3H 1991 C l� m (Hdl) W3H 1`JS t•99 L '4 C C } x0 -H JI A4N -~ ` V L Z b J LJ fl c O " Q J-H61MN o rn La W a Lu Q J-HJLMWX3i9 V5 � X319 a U) Lit � W 9= C110H Hd1MN r •C 21 o 5d3NiV1NOO d0'dD9h 3N C Q N X_ o N � T L r fr d a o c3 X3 b J : C [Q N � N LiJ J 71 7 V N w V L Y at 0 0 — tl7 Z cP W m o m E M uo f Q 0 > ! m Zw Z ::J U � w U E C w w w ¢ rc ¢ w ¢ 0 Li Li J s 1 ` F < tvJ U<- "1 J L CL LIJ � { JQ 0 cr I [fl CO v U Lu d a- C) CL w 7 j7 W Q a 0 H z a C C l� '4 C C } f2 -~ ` V G a U b J LJ fl c O " O > x c n o rn La W a Lu o N .o a Lit � r •C 21 o C y N Q7 `ke C C } f2 V b J LJ fl c � O > x c n o rn La W a Lu O U m 6y Lit � r C Q N o N � T L r a o c3 X3 b : C [Q 1>-6 71 7 V N w V L Y at 0 0 — tl7 Z cP W m o m E M Q 0 > ! m Zw Z ::J U � w U E C w w w ¢ rc ¢ w ¢ 0 C C } f2 V b J LJ fl c � O > x c n W a Lu VH. OTHER PERMITS • Building Permit • ROW Use Permit • Sanitary Sewer and Water Connection Permit — City of Renton State Permits: • SWPPP (Stormwater Pollution Prevention Plan Permit from the Department of Ecology VIII. EROSION/SEDIMENTA'TION CONTROL DESIGN All temporary erosion and sediment control requirements designed in accordance with Core Requirement 45 of the 2009 KCSWDM, section 1.2.5, Erosion and Sediment Control' These standards prevent or reduce pollution of stormwater runoff cause by construction activities. Temporary Erosion and Sediment Control Plan is designed to minimize the amount of sediment laded runoff that Ieaves the project site, protecting downstream properties from construction and grading activities. The project site proposes more than 1 acre of disturbed area and is therefore required to seek coverage under the Department of Ecology's General Permit for Construction Stormwater. A Construction Stormwater Pollution Prevention Plan (CSWPPP) ESC Plan Analysis and Design (Part A) The following narrative describing proposed TESC measures: Clearing Limits: Clearing limits are shown clearly on TESC plans with details sufficient to install and maintain during construction. Cover Protection: The type and location of temporary cover measures to be used onsite is shown on the TESC plans. Compost filter socks may also be used where a silt fence could cause more disturbance that would be mitigated. Perimeter Protection: Silt fencing location and details for installation are shown on the TESC plans_ Traffic Area Stabilization: A single construction entrance is shown on the TESC plans. The contractor may adjust this road location as necessary during construction upon approval of the 3ounty inspector. Dust control measures per D.2.8 of 05 KCSWDM shall also be utilized as indicated on plans. Additional information will be provided IX. BOND QUANTITIES WORKSHEET, FACILITY SUMMARIES, & DECLARATION OF COVENANT On the following information will be provided upon approval of preliminary short plat. Bond Quantity Worksheet Facility Summaries Declaration of Covenant X. MAINTENANCE AND OPERATION MANUAL m Ph 253-896-1011 Fx 253-896.2633 Mr. Kushal Varma 2609 NE 5 1 Court Renton, WA 98056 (206) 353-3168 GeoResources, LLC 5007 Pacific Hwy E., Ste. 16 Fife, Washington 98424 May 23, 2014 Geotechnical Infiltration Feasibility Letter 2001 Union Ave NE Renton, Washington PN: 0423059077 Job No. Varma.UnionAvNE.IR INTRODUCTION & SCOPE This report addresses the feasibility of stormwater infiltration for the proposed residential short plat to be located at 2001 Union Avenue NE in Renton, Washington. We understand that you propose to construct a new residence on each of the new lots. We further understand that access to the lots will be a shared driveway along the south portion of the site. We also understand that you propose to infiltrate the stormwater from the proposed roofs on each lot, where feasible. The King County Surface Water Design Manual (2009) requires soil logs to confirm subsurface conditions and to determine the feasibility of stormwater infiltration at the site. On May 16, 2014, we monitored the excavation of five test pits across the site and logged the subsurface conditions encountered. Soil samples were collected and a representative sample tested for grain size distribution. The purpose of our services was to evaluate the surface and subsurface conditions at the site as a basis for developing and providing geotechnical stormwater recommendations for the proposed development. Specifically, our scope of services for the project included the following: 1. Visiting the site and conducting a geologic reconnaissance to assess the site's soil, groundwater and slope conditions; 2. Exploring the subsurface conditions across the site by monitoring the excavation of test pits; 3. Completing laboratory grain size analysis for representative site soils; and 4. Providing infiltration rates for the stormwater facilities, as appropriate. SITE CONDITIONS Surface Conditions The site is situated in an area of established residential development in Renton, Washington. The site is currently developed with an existing single family residence with a basement configuration. The site is rectangular in shape, measures approximately 330 feet by 135 feet, and encompasses 1.02 acres. The ground surface on the site generally slopes from the east to the west at inclinations of less than 10 percent. Total topographic relief on the site is on the order of 5 vertical feet. Site Soils and Geologic Conditions The USDA Natural Resource Conservation Service (MRCS) Web Soil Sgrvey.ffl. r . King County maps the soils in the area of the site as Alderwood gravelly sandy lic3am JUL 14 2011 Varma,UnionAveNEARR May 23, 2014 Page 2 (AgC). The Aiderwood soils are derived from glacial till that form on S to 15 percent slopes and are listed as having a "slight to moderate" erosion hazard. The near surface soils at the site have been disturbed by natural weathering processes that have occurred since their deposition. The geologic map for the site area indicates the site is situated in an area of glacial till (Qgt). An excerpt from the geologic map is included at Figure 4. Subsurface Conditions Subsurface conditions were evaluated by excavating five test pits across the site. The near surface soils consisted of 0 to 112- to 1 -foot of topsoil with numerous roots over medium dense fine grained sand with silt and varying amounts of small gravel. We interpret these sandy soils to represent the weathered sandy outwash deposits. At depths of 3 to 4 feet, we encountered a dense indurate silty sand with gravel, representative of glacial till. The indurate glacial till was observed to the full depth explored in all our test pits. The observed stratigraphy generally confirmed the mapped stratigraphy. The locations of our explorations are included on the Site Plan as Figure 2. The soils encountered were visually classified in accordance with the Unified Soil Classification System (USCS), a copy of which is attached as Figure 5. The Test Pit Logs are attached as f=igures 6a and 6b. Laboratory Analysis Our geotechnical laboratory tests were completed on a representative soil sample collected from the test pits at the site. The tests performed included a grain size analysis, cation exchange capacity and organic content. Our grain size laboratory test results indicated that the soils on the site consist of sand with silt and minor gravel. The attached laboratory testing sheets graphically present these results. Copies of the grain size and cation/organic tests are attached. TABLE 1 LABORATORY TEST RESULTS FOR ON-SITE SOILS Gravel Content Sand Content SiitlClay Content Depth - Soil Type percent(percent) (percent) 2 to 3.5 feet 28.0 45.0 27.0 Outwash Sand wl Silt The minimum required CEC is 5 mEq/100g in order for soils to be used as a treatment layer beneath a water quality facility, such as porous pavement. The cation exchange capacity for the sample was 15.7 Na, mEq/l OOg and the organic content was 4.4% dry weight, which meets the requirement. A porous pavement section can be provided at your request_ Groundwater Conditions No evidence of seasonal groundwater such, as mottling, was observed at the upper contact of the glacial till at 3 to 4 feet below the ground surface in the test pits at the time of excavation. Based on the nature of the near surface soils, we anticipate fluctuations in the local groundwater levels will occur in response to precipitation patterns, general development in the area, and site utilization. Va rma. UnionAveNE_ I R R May 23, 2014 Page 3 CONCLUSIONS AND RECOMMENDATIONS Based on the soils encountered in our explorations, laboratory analysis, and our engineering analysis, we conclude that limited infiltration of storm water is feasible in the shallow on site soils encountered on the site. The shallow soils appear to have adequate permeability and storage capacity to infiltrate a portion of the stormwater on the site, provided adequate design, construction and maintenance practices are used. We recommend that pervious pavement or pavers be considered for the shared driveway and parking areas of the residences. In filtration trenches or dry wells may be utilized for the roof runoff at the site. Specific geotechnical recommendations for earthwork and building development may be provided upon request. Stormwater Infiltration We recommend that pervious pavement or pavers be utilized for the shared driveway and parking areas of the residences. This will reduce the amount of required infiltration via trench systems. For the roof systems, storm water infiltration rates were determined in accordance with the King County Surface Water Design (2009) (KCSW DM). We performed a sieve analysis on a representative soil sample collected from the test pits at the site. We expect that the trenches will need to be relatively shallow, 2.5 to 3 feet bgs (below ground surface) to provide the minimum separation from the underlying till soils. Based on the results of our sieve analysis and our experience, the sand with minor silt and gravel are comparable to "medium sand" (Soil Type 2B) to "tine sand, loamy sand" (Soil Type 3). According to the KCSWDM section 4.5.1, the "fine sand, loamy, soils related to 60 feet per 1,000 sq ft of roof area for limited infiltration in gravel filled trenches. The following formula is used to calculate the length of root downspout trenches: L= (Ar11000)(1)(k) where Ar is the area of the roof, I is the length of the trench required per soil type, and k is the regional scale factor. The scale factor for the subject site is 1. Appropriate design, construction and maintenance measures will be required to ensure the infiltration rate can be effectively maintained over time. It should be noted that special care is required during the grading and construction periods to avoid fine sediment contamination of the infiltration system. This may be accomplished by using an alternative storm water management location during grading and construction activities. All contractors working on the site (builders and subcontractors) should be advised to avoid "dirty' stormwater flowing to the site's stormwater system during construction and landscaping activities at the site. Concrete trucks should not be washed or cleaned on-site. Suspended solids could clog the underlying soil and reduce the infiltration rate for the system. To reduce potential clogging of the infiltration systems, the infiltration system should not be connected to the stormwater runoff system until after construction is complete and the site area is landscaped, paved or otherwise protected. Temporary systems may be utilized through construction. Periodic sweeping of the paved areas will help extend the life of the infiltration system. L F-- Q5 C 0 N N 7, W s E 0 L 3 a C _0 U a� 0 0 w a� CO 0 X N L a a� 3 m ar CG L F- 104 90 80 70 CC W 60 Z U- z 50 LIJ U LLil 40 LL Mill 20 10 n SIEVE SIZE PERCENT FINER SPEC.* PERCENT PASS? (X=NO) 314 100 112 95 PL= LL= 318 91 Coefficients #4 84 DBD= 0.6669 D50= 0.3516 #10 72 Dtp= Cu= #20 63 Classification #40 54 #60 43 #100 34 #200 27 (no specification provided) Sample Number: 090840 GeoResources, LLC Fife, WA Client: Varma-Kushal Project: Union Ave. ITE Tested By: Timothy Bergstrom Checked By: Brad Big erstaff Remarks Date: Material Description Brown Silty Sand with Trace Gravel Natural Moisture = 18.75% Atterberg_Lirnits PL= LL= P1= Coefficients Dgff 8.4038 D85= 5.3837 DBD= 0.6669 D50= 0.3516 Dom= 0.0475 D15- Dtp= Cu= Cc= Classification USCS= AASHTC= Client: Varma-Kushal Project: Union Ave. ITE Tested By: Timothy Bergstrom Checked By: Brad Big erstaff Remarks Date: Varma.UnionAueNE.IR R May 23, 2014 Page 4 We trust this is sufficient for your current needs. Should you have any questions, or require additional information, please contact us at your earliest convenience. Respectfully submitted, GeoResources, LLC Brad Biggerstaff, LHG Principal BPB:Up6 DoGID: Varrna.UNOnAVe.lfl Atladwnents: Figure 1; Site Vicinity Map Figure 2_ Faaploration Map Figure 3: NRCS Soils Map Figure 4: Geology Map Figure S: Unified Soil Classilicatian System Figure 6: Test Pit Logs Grain Size Analyses (2) i v 25Pt PL Y NMot ST NE23rF1.Sr'y N[WrItST a r z 1 ,\ L__i■:6wcartIe r �•H v 7TTr� ¢T_. Il&E-WTH Tn A _ .. _ _ x I N'E 23Trl R - - Mareek Park - Co PL NE2TDI -YC ... -_ .. I NWOr ST NE 25TH PL i Z 7 =7SM CT ulr,,E9&YHx qfl�- w{4i NiE 25TH 5T d SE 99TN $T NE25TffAL #{ sr N24TNST , Nr-wmi ST j" { Z� ty�23riR5Y rtj C I 3 ssi' m $ N_2sTHCTNE ., N9241"I ST G NE237RPI t, V'� : �1 NE23ADP1, ' y NE23AA5T RQ f�nn HE224D 25TH CT NE.2'.TJ15T� 1 ' fi w Z P_ NE22NDST c �` a NE2cruisT ....SE1dbTH-sT Nrnsrsr � S •.� I' U Z_ y i NE19Tlf p ;. % kEnrHPt ��,� NE18T4isT NE 17TN 57.E E 1rrJr ST y _. Renton'- tj y S NC114TI PL NE Mtp, u, �. v 19TZ .sj 'un ...-._t#b12TH S'T 2 NE1iT4Pi riE11T1/5T z o A Ne or n x C: NE tOT11 I PL - NE 407!157 O` � r L NE IOTJI IN N61OTH ST 4' 2 ".G' m NE 101H ST -m {qt cP.Na 9TI Pt 2C m _ NE STH ST Y-� } .� 1 J I N_c 9T14 ST m �- P7EJJiH AL n � m n- > }fiwdl115 Park -Renton rl M IJ yrh{ ST lrr.7r .. _..., 9 2 1aE r, r, HEOTtIST 9. Y- i2O091(in Cvunt 0 18 9ft14S7TlIGT Approximate Site Location (map created from Pierce County Public GIS website) t� 1W ir Not to Scale GeoResources, LLC Site Vicinity Map 5007 Pacific Highway East, Suite 16 20Q1 Union Avenue NE Fife, Washington 98424 Phone: 253-896-1011 Renton, Washington Fax: 253-896-2633 Job ID- VarMaK.NUnionAve.F May 2014 Figures Approximate Site Location (map created from Google EarthTM ) Site Exploration Plan 2001 Union Avenue NE Renton, Washington Job !D: VarmaK.NUnionAve.F iSl Y s!" 20$1 StL .} IA X91 $t A S'.0 t Iv_�� �r • — - � 1• T � - !aC: h'^ � �,•E .e� Y ¢ �.., yg, II88i - J . � -•#y •,�.-� is F � -ti = t � � } .r F7tlk�f , 1 .t. Approximate Site Location (Geology Map created on the Department of Natural Resources, Division of Geology and Earth Resources — Washington's Geologic Survey, Washington Interactive Geologic Map website, https:/Ifortress.wa_gov/dnr/Qeology/?Theme=wigm) GeoResources, LLC 5007 Pacific Highway E, Ste 16 Fife, Washington 98424 Phone: 253-896-1611 Fax: 253-896-2633 Qgt — Vashon Glacial Till Qva — Vashon Glacial Advance Outwash Geologic Map 2001 Union Avenue NE Renton, Washington Job ID: VarmaK.WntonAve.F I May 2014 Not to Sale Figure 4 SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP SYMBOL GROUP NAME GRAVEL CLEAN GW WELL -GRADED GRAVEL, FINE TO COARSE GRAVEL GRAVEL COARSE GP POORLY -GRADED GRAVEL GRAINED More than 50% SOILS Of Coarse Fraction GRAVEL GM SILTY GRAVEL Retained on WITH FINES No. 4 Sieve GC CLAYEY GRAVEL SAND CLEAN SAND SW WELL -GRADED SAND, FINE TO COARSE SAND More than 5M Retained on No. 200 Sieve SP POORLY -GRADED SAND More than 503 Of Coarse Fraction SAND SM SILTY SAND Passes WITH FINES No. 4 Sieve SC CLAYEY SAND SILT AND CLAY INORGANIC ML SILT CL CLAY FINE GRAINED SOILS Liquid Limit Less than 50 ORGANIC OL ORGANIC SILT, ORGANIC CLAY SILT AND CLAY INORGANIC MH SILT OF HIGH PLASTICITY, ELASTIC SILT More than 50% Passes CH CLAY OF HIGH PLASTICITY, FAT CLAY No. 200 Sieve Liquid Limit 50 or more ORGANIC OH ORGANIC CLAY, ORGANIC SILT HIGHLY ORGANIC SOILS PT PEAT NOTES: Field classification is based on visual examination of soil in general accordance with ASTM D2488-90. Soil classification using laboratory tests is based on ASTM D2487-90. Description of soil density or consistency are based on interpretation of blow count data, visual appearance of soils, and or test data. SOIL MOISTURE MODIFIERS: Dry- Absence of moisture, dry to the touch Moist- Damp, but no visible water Wet- Visible free water or saturated, usually soil is obtained from below water table GeoResources, LLC SOIL CLASSIFICATION SYSTEM 5007 Pacific Hwy. E, Ste 20 Fife, Washington 98424-2648 Ph. 253-896-1011 Fx. 253-896-2633 FIGURE Test Pit TP -1 Location: South central portion of site Depth (feet) Soil Type Soil Description 0 - 0.3 Sod/TS 0.3 - 4.5 SP Org Brn SAND wl si, occ. gravel (loose to med. dense, moist) 4.5 5.0 SM Gry brown silty SAND w/ gravel, occ. cobbles (v. dense, moist) (Glacial Till?) Terminated at 5 feet below ground surface. No caving observed. No groundwater seepage or mottling observed. Test Pit TP -2 Location: Southwest portion of site Depth {feet) Soil Type Soil Description ^ 0 - 0.5 Sod/Dark brown sdy TS 0.5 - 4.0 SP Brown SAND wl minor silt, occ gravel (loose to medium dense, moist) 4.0 - 4.5 SM Gry brown silty SAND w/ gravel, cobbles (v. dense, moist) Terminated at 4.5 feet below ground surface. Moderate sidewall caving observed to full depth explored. No groundwater seepage or mottling observed. Test Pit TP -3 Location: Southwest c of site Depth (feet) Soil Type Soil Description 0 - 0.3 Sod/TS 0.3 - 1.0 SM Dk Brn si SAND w/ organics (loose, damp) 0.3 - 3.5 SP Org Brn SAND wl si, occ. gravel (loose to med. dense, moist) 3.5 4.0 Gry brown silty SAND w/ gravel, occ. cobbles (v. dense, moist) (Glacial Till?) Terminated at 4 feet below ground surface. No caving observed. No groundwater seepage or mottling observed. GeoResources, LLC 5007 Pacific Highway Past, Suite 16 Fife, Washington 98424 Phone. 253-896-1011 Fax: 253-896-2633 Test Pit Lags Proposed Single Family Residence 6610 South Tyler Tacoma, Washington Test Pit TP-4 Location: NW portion of site Depth feet Soil Type Soil Description 0 - 0.3 SodfiS 0.3 - 3.5 SP Org Brn SAND wf si, occ. gravel (loose to med. dense, moist) 3.5 - 4.0 SM Gry brown silty SAND w/ gravel, occ. cobbles (v. dense, moist) (Glacial Till?) Terminated at 4 feet below ground surface. No caving observed. No groundwater seepage or mottling observed. Test Pit TP-5 Location: Southwest portion of site Depth feet Soil Type Soil Description 0 - 0.5 Sod/Dark brown sdy TS 0.5 - 4.5 SP Brown SAND w/ minor silt, occ gravel (loose to medium dense, moist) 4.5 - 5.0 SM Gry brown silty SAND w/ gravel, cobbles (v. dense, moist) Terminated at 4.5 feet below ground surface. Moderate sidewall caving observed to full depth explored. No groundwater seepage or mottling observed. By:BPB May 16, 2014 GeoResources, LLC Test Pit Logs 5007 Pacific Highway East, Suite 16 Proposed Single Family Residence Fife, Washington 98424 6610 South Tyler Phone: 253-896-1011 Tacoma, Washington Fax: 253-896-2633 JOB# Varma.UnionAve.fR May 2014 Figure6b SPECTRA Laboratories 2221 Ross Way Tacoma, WA 99421 • (253) 2724-850 4 .-- Fax (253) 572-9838 • www-spectra-iab.com - -- 65/2012014 Analyte Result Units Method Organic Matter 4.4 wt. % Dry ASTM D-2974-13 Cation Exchange Capacity 15.7 Na, mEq/ 100g SW846 9081 SPECTRA LABORATORIES Steve Hibbs, Labora ory Manager Page 1 of 1 a6hnkw Project: Varma, Kushal-Union Ave NE Geo Resources, LLC Client ID- 090839 TP -1 5007 Pacific Hwy. E Sample Matrix: Soil Suite 16 Date Sampled: 05/15/2014 Fife, WA 98424 Date Received: 05/15/2014 Spectra Project: 2014050454 Spectra Number: 1 Analyte Result Units Method Organic Matter 4.4 wt. % Dry ASTM D-2974-13 Cation Exchange Capacity 15.7 Na, mEq/ 100g SW846 9081 SPECTRA LABORATORIES Steve Hibbs, Labora ory Manager Page 1 of 1 a6hnkw ■ o WuLLIEE !o W Im ci VJ 1-- 't :3 z, I-- (A.31O3dS) SOfl05 a fl 5 cc 0 l3VIOd HSt O�r,W] h ll£]113>ffll Z $ a XO31Xoi/X.L S1tO61OV06 Hd x Q O @ V U) v vi (1. md8) SIVA VW dial mm C m 9 VHO1� SlV13IN 4-101 _ g (M*AdS) Sl013iA lVLOl 8 VUOU SIV13IN lV1pl ra w O Ca v U3 U 80d 9092808 �• n r m T 15a C a %S (D dNd/HVd OLM E B tlOA1W3S SSS 01x9 d `mom w Q Slbl3A?Ofi UOIHO 09EM VOA 4i;9/09Ucu �� L Z t LLI Z T O 0 (Jad} W3H X931 w 0 (H" W3H 1.08 t*9 t N 2 Q XO-Hd1MN Q C CL 0 J-HdIMN co w o O 3 Hd 114�N/X�19 z U o _ X318 U) 1 .~�. ti ct OIOH-HdMN a � JL [C y1 Q Q 1 m Q rb UUMVINCY) 30 d38WfkNir `i` a � con E�'� ❑ Lu vi N ° �d n @ m 0 o • �--{ .--r ODLLJ 11.1 ❑ 7 4 I— i 00 T m m a` `oal 0.. C3 O z N w c cc cc ac cc LLI Lfi IL ` xxU can �w v Z t'i a8i ?, p ?t U n is cC U ,l C`... Z Q m q v 1X c � cb U] yr d L LI D a W 7 _4 �y CTE co } m I LU v F Z~ W O ILC3 2 O cr `� v c _— _— o CL CL r N M v in co ti co m o ca OLD REPUBLIC Attached Commitment Issued for the sole use of: CENTURY 21 - SEATTLE NORTH HOMES 11330 Roosevelt Way NE Seattle, WA 98125 Attention: NIT N1RAN3AN 19020 33rd Avenue W., Suite 360 Lynnwood, WA 98036 (425) 776-1970 SECOND REPORT Our Order Number 520712 0943 Customer Reference RAM when Replying Please Contact Stephanie Dvorak Marlene Graber Pam Selle Tonya Harris P (425) 776-4305 Direct line: (425) 776-5890 Fax: (425) 776-3350 See Attached Commitment to Insure F F JUL 14 ?014 y ALTA Commitment * COMMITMENT FOR TITLE INSURANCE ** * Issued by Old Republic National Title Insurance Company OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY, a Minnesota corporation ("Company'}, for a valuable consideration, commits to issue its policy or policies of title insurance, as identified in Schedule A, in favor of the Proposed Insured named in Schedule A, as owner or mortgagee of the estate or interest in the land described or referred to in Schedule A, upon payment of the premiums and charges and compliance with the Requirements; all subject to the provisions of Schedules A and B and to the Conditions of this Commitment. This Commitment shall be effective only when the identity of the Proposed Insured and the amount of the policy or policies committed for have been inserted in Schedule A by the Company. All liability and obligation under this Commitment shall cease and terminate six (6) months after the Effective Date or when the policy or policies committed for shall issue, whichever first occurs, provided that the failure to issue the policy or policies is not the fault of the Company. The Company will provide a sample of the policy form upon request. Issued through the office of: OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY Old Republic Title, Ltd. A corporation 13DZU 33rd'Avenue W., Suite 36U 371-1111 Lynnwood, �54f1� (612) 371-1111 Lynnwood, WA 98036 BY Att�f -woo $BCfgf� Authorized Officer or Agent Page 1. of 9 Pages ORTIC 1613 (2006) OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY Order Num 5207120943 * * ALTA Commitment SCHEDULE A 1, Effective Date: June 12, 2014, at 8:00 AM SECOND REPORT 2. Policy or Policies to be issued: Customer Reference: RAM Homeowner's Policy of Title Insurance - 2010 Amount: $700,000.00 Premium: $1,765.00 Tax: $167.68 Rate: Homeowners Proposed insured: Purchaser for value from the vested owner herein ALTA Loan Policy - 2006 Amount: Amount to come. Rate: Simultaneous Note: Extended Coverage Proposed Insured: To be determined The printed Exceptions and Exclusions from the coverage and Limitations on Covered Risks of said Policy or Policies are set forth in Exhibit A attached. Copies of the Policy forms should be read. They are available from the office which issued this Commitment. 3. The estate or interest in the land described or referred to in this Commitment is Fee Simple 4. Title to the estate or interest in the land is at the Effective Date vested in: KAJAL A. RAM and KUSHAL S. VARMA, wife and husband 5. The land referred to in this Commitment is described as follows: Page 2 of 9 Pages ORTIC 1614 OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY Order Nunn 5207120943 See Legal Description Exhibit. This Commitment is nat valid without SCHEDULE A and SCHEDULE B. Page 3 of 9 Pages OPTIC 1614 OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY Order Number: 5207120943 SCHEDULE B Customer Reference: RAM I. REQUIREMENTS: 1. Pay us the premiums, fees and charges for the policy. 2. Documents satisfactory to us creating the interest in the land and/or the mortgage to be insured must be signed, delivered, and recorded. 3. You must tell us in writing the name of anyone not referred to in this Commitment who will get an interest in the land or who will make a loan on the land. we may then make additional requirements or exceptions. 4. Release(s) or Reconveyance(s) of appropriate items. S. If any document in the completion of this transaction is to be executed by an attomey-in- fact, the completed Power of Attorney form should be submitted for review prior to closing. 6. The Homeowner's Policy applies only if each insured named in Schedule A is a Natural Person (as Natural Person is defined in said policy). If each insured to be named in Schedule A is not such a Natural Person, contact the Title Department immediately. Page 4 of 9 Pages ORTIC 1616 OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY Order Number: 5207120943 SCHEDULE B continued Customer Reference: RAM II. Schedule B of the policy or policies to be issued will contain exceptions to the following matters unless the same are disposed of to the satisfaction of the Company: Defects, liens, encumbrances, adverse claims or other matters, if any, created, first appearing in the public records or attaching subsequent to the Effective Date hereof but prior to the date the proposed Insured acquires for value of record the estate or interest or mortgage thereon covered by this Commitment. Encroachments, or questions of location, boundary and/or area which an accurate survey may disclose. 2. Easements or claims of easements not disclosed by the public records. 3. Rights or claims of parties in possession not disclosed by the public records. 4. Any lien or right to lien for services, material, labor, and/or contributions to an employee benefit fund or State Workers' Compensation that is not disclosed by the public records. 5. Exceptions and reservations in United States patents, Indian tribal codes or regulations, Indian treaty or aboriginal rights, including easements and equitable servitudes. Water rights, claims or title to water. Any service, installation or general connection charges for sewer, water, electricity, telephone, gas and/or garbage removal. 7. General taxes not now payable; special assessments and/or special levies, if any, that are not disclosed by the public records. 8. Terms and provisions as contained in an instrument, Entitled Short Plat No. 677115 Recorded December 13, 1977 in Oficial Records under Recording Number 7712130605 Page 5 of 9 Pages OPTIC 1618 OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY Order Number: 5207120943 9. Lien of Real Estate Excise Sale Tax upon any sale of said premises, as established by the Washington State Department of Revenue. NOTE: As of the date of this commitment, the current Excise Tax Rate is: .0178. Confirm the current rate by contacting the following prior to closing: Name of Agency King County Records and Election Division, Excise Tax Department at Telephone Number (206) 296-1843 10. DELINQUENT GENERAL TAXES, PLUS INTEREST AND PENALTY AFTER DELINQUENCY; 1sT HALF DELINQUENT ON MAY 1; 2ND HALF DELINQUENT ON NOVEMBER 1: For year 2014 Amount Billed $4,154.33 Amount Paid $0.00 Parcel No. : 042305-9077-03 Levy Code 2100 Assessed Valuation: Land: $263,000.00 Improvements: $28,000.00 11. Deed of Trust to secure an indebtedness of the amount stated below and any other amounts payable under the terms thereof, Amount $387,099.00 Trustor/Borrower Kajal A. Ram, and Kushal S. Varma, wife and husband Trustee ReconTrust Company, NA Beneficiary/Lender : Bank of America, N.A. Dated April 3, 2012 Recorded April 9, 2012 in Official Records under Recording Number 20120409000550 Loan No. 00024229055204012 12. Title is to vest in persons not yet revealed, and when so vested will be subject to matters disclosed by a search of the records against their names. ------ Informational Notes --------_- ------ A. NOTE: According to the public records, there have been no deeds conveying the property described in this report recorded within a period of 36 months prior to the date hereof except as follows: NONE Page 6 of 9 Pages oRTIC 1618 OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY Order Number: 5207120943 NOTE: The last recorded transfer or agreement to transfer the land described herein is as follows: Recorded April 4, 2008 in Official Records under Recording Number 20080404001416 B, Pursuant to WAC Code 284-29-260, there will be a cancellation charge (minimum of $50 plus tax) in the event the proposed transaction does not close. C. NOTE: This report covers land which was identified by street address and/or tax parcel number(s) — assessor's parcel number(s) when the order was opened. D. Potential charges, for the icing County Sewage Treatment Capacity Charge, as authorized under RCW 35.58 and Icing County Code 28.84.050. Said charges could apply for any property that connected to the King County Sewer Service Area on or after February 1, 1990. For further information please contact the King County Wastewater Treatment Division at. (206)-684-1280. E. The applicable rate(s) for the policy(s) being offered by this report or commitment appears to be section(s) 35, 29 and 19. Short Term Rate (" STR'j applies (but may be precluded or limited by application of the above shown section(s) of our Schedule of Fees and Charges.) Page 7 or 9 Pages oRTIC 1618 OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY Order Number: 5207120943 G. NOTE: To help you avoid delays at closing, we would like to make you aware of our final recording run times, in which the recording documents leave our office. Documents must be delivered to our office at least 15 minutes prior to our last recording run for review and preparation. REGULAR RECORDINGS: King County: 2:00 p.m. Pieme County: 2:30 p.m. Snohomish County: 1:15 p.m. Monday through Thursday, 12:15 p.m. on Friday KING and SNOHOMISH COUNTY recordings are processed out of our Lynnwood Office at: 19020 33rd Ave. W., Suite 360, Lynnwood, WA 98036 PIERCE COUNTY recordings are processed out of our University Place Office at: 6721 Regents Blvd., Suite A, University Place, WA 98466 &RECORDINGS: King County: Non -Excise Only, 3:25 p.m. Pierce County: Non -Excise Only, 3:45 p.m. Snohomish County: Both Exdse and Non -Excise 3:30 p.m. Monday through Thursday 3:00 p.m. Friday NOTE: There is an additional $5.00 per document charge for E -Recordings. If you do not want your docs E -Recorded, you must tell us on your closing order and schedule the docs to be delivered to us aocording to the REGULAR RECORDING delivery times. For E -Recording Excise Transactions (available in Snohomish County only at this time), checks must be inducted in your recording package and made payable to: Old Republic Title, Ltd. NOTE: A $1.00 mailing fee will be charged per document recorded by Old Republic Title, Ltd. IMPORTANT!!! Please make sure NOTHING appears in the one inch margin of your documents or the three inch margin at the trop of page one. This includes signatures, initials and notary seals. If the margins are not dear, the county will not record the document! H. Matters dependent upon inspection of the premises have been deared for ALTA Mortgagee's Policy. The ALTA Mortgagee's Policy, when issued, will contain the ALTA 9 (CLTA 100), ALTA 22 (CLTA 116), ALTA 8.1 endorsements. NOTE: The CLTA 116 may describe the improvements as a Single Family Residence known as 2001 Union Avenue Northeast, Renton, WA 98059. Page 8 of 9 Pages ORTIC 1618 OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY Order Number: 5207120943 Note: The Premium for the Homeowner's Policy is itemized as follows: Description Amount Residential Sale Rate $1,544.00 Homeowners Policy Surcharge $221.00 Sales Tax $167.68 Total Premium, including Tax : $1,932.68 cm/INKS Page 9 of 9 Pages ORTIc 1618 OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY CONDITIONS 1. The term mortgage, when used herein, shall include deed of trust, trust deed, or other security instrument. 2. If the proposed Insured has or acquired actual knowledge of any defect, lien, encumbrance, adverse claim or other matter affecting the estate or interest or mortgage thereon covered by this Commitment other than those shown in Schedule B hereof, and shall fail to disclose such knowledge to the Company in writing, the Company shall be relieved from liability for any loss or damage resulting from any act of reliance hereon to the extent the Company is prejudiced by failure tQ so disclose such knowledge. If the proposed Insured shall disclose such knowledge to the Company, or if the Company otherwise acquires actual knowledge of any such defect, lien, encumbrance, adverse claim or other matter, the Company at its option may amend Schedule B of this Commitment accordingly, but such amendment shall not relieve the Company from liability previously incurred pursuant to paragraph 3 of these Conditions and Stipulations. 3. Liability of the Company under this Commitment shall be only to the named proposed Insured and such parties inducted under the definition of Insured in the fiarm of policy or policies committed for and only for actual loss incurred in reliance hereon in undertaking in good faith (a) to comply with the requirements hereof, or (b) to eliminate exceptions shown in Schedule B, or (c) to acquire or create the estate or interest or mortgage thereon covered by this Commitment. In no event shall such liability exceed the amount stated in Schedule A for the policy or policies committed for and such liability is subject to the insuring provisions and Conditions and Stipulations and the Exclusions from Coverage of the form of policy or policies committed for in favor of the proposed Insured which are hereby incorporated by reference and are made a part of this Commitment except as expressly modified herein. 4. This Commitment is a contract to issue one or more title insurance policies and is not an abstract of title or a report of the condition of title. Any action or actions or rights of action that the proposed Insured may have or may bring against the Company arising out of the status of the title to the estate or interest or the status of the mortgage thereon covered by this Commitment must be based on and are subject to the provisions of this Commitment. 5. The policy to be issued contains an arbitration clause. All arbitrable matters when the Amount of Insurance is $2,000,000 or less shall be arbitrated at the option of either the Company or the Insured as the exclusive remedy of the parties. You may review a copy of the arbitration rules at http://www.alta.org. If a policy other than the 2006 ALTA Owner's Policy of Title Insurance, 2006 ALTA Loan Policy of Title Insurance or 2006 ALTA Short Form Residential Loan Policy is ultimately issued, the arbitration provisions of the issued policy shall control. ORDER NO.: 5207120943 LEGAL DESCRIPTION EXHIBIT The land referred to is situated in the County of King, City of Renton, State of Washington, and is described as follows: Tract 2, County of King Short Subdivision No. 677115, recorded under King County Recording No. 7712130605, records of King County, Washington. SITUATE in the County of King, State of Washington Property Address: 2001 Union Avenue Northeast, Renton, WA 98059 ABBREVIATED LEGAL Tract 2, County of King Short Subdivision No. 677115, Recording No. 7712130605. Tax Account No. 042305-9077-03 Page Iof1 Exhibit A CLTA HOMEOWNER'S POLICY OF TITLE INSURANCE (02/03/10) ALTA HOMEOWNER'S POLICY OF TITLE INSURANCE EXCLUSIONS In addition to the Exceptions in Schedule 8, You are not insured against loss, casts, attomeys' fees, and expenses resulting from: Governmental police power, and the existence or violation of those portions of any law or government regulation concerning: a. building; b. zoning; C. land use; d. improvements on the land; e. land division; and f. environmental protection. This Exclusion does not limit the coverage described in Covered Risk 8.a., 14, 15, 16, 18, 19, 20, 23 or 27. 2. The failure of Your existing structures, or any part of them, to be constructed in accordance with applicable building Codes. This Exclusion does not limit the coverage described in Covered Risk 14 or 15. 3. The right to take tihe Land by condemning k This Exclusion does not limit the coverage described in Covered Risk 17. 4. Risks: a, that are created, allowed, or agreed to by You, whether or not they are recorded in the Public Records; b. that are Known to You at the Policy Date, but not to Us, unless they are recorded In the Public Records at the Policy Date; C. that result in no loss to You; or d, that first occur after the Policy Date - this does not limit the coverage described in Covered Risk 7, 8.e., 25, 26, 27 or 28. 5. Failure to pay value for Your Title. 6. Lade of a right: a. to any land outside the area specifically described and referred to in paragraph 3 of Schedule A; and b. in streets, alleys, or waterways that touch the Land. This Exclusion does not limit the coverage described in Covered Risk 11 or 21. 7. The transfer of the Title to You is invalid as a preferential transfer or as a fraudulent transfer or conveyance under federal bankruptcy, state insolvency, or similar creditors' rights laws. LIMITATIONS ON COVERED RISKS Your insurance for the fallowing Covered Risks is limited on the Owners Coverage Statement as follows: For Covered Risk 16, 18, 19, and 21 Your Deductible Amount and Our Maximum Dollar Limit of Liability shown In Schedule A. The deductible amounts and maximum dollar limits shown on Schedule A are as follows: YQgf Deducible Amount Covered Risk 16: 1.00% of Policy Amount or $5,000.00 (whichever is less) Covered Risk 18: 1.00% of Policy Amount or $5,000.00 (whichever Is less) Covered Risk 19: 1.00% of Policy Amount or $5,000.00 (whidmever is less) Covered Risk 21: 1.00% of Policy Amount or $5,000.00 (whichever is less) Page 1 of 2 Our Maxdmum Dollar Wmit of Liability $25,DD0.00 $25,000.00 $25,000.00 $25,000,00 Exhibit A AMERICAN LAND TIRE ASSOCIATION LOAN POLICY OF TITLE INSURANCE - 2006 EXCLUSIONS FROM COVERAGE The following matters are expressly excluded from the coverage of this policy, and the Company will not pay loss or damage, costs, attomeys' fees, or expenses that arise by reason of: 1. (a) Any law, ordinance, permit, or governmental regulation (including those relating to building and zoning) restricting, regulating, prohibiting, or relating to (i) the occupancy, use, or enjoyment of the Land; (ii) the character, dimensions, or location of any improvement erected on the land; (iii) the subdivision of land; or (iv) environmental protection; or the effect of any violation of these laws, ordinances, or governmental regulations. This Exclusion 1(a) does not modify or limit the coverage provided under Covered Risk 5. (b) Any governmental police power. This Exclusion 1(b) does not modify or limit the coverage provided under Covered Risk 6. 2. Rights of eminent domain. This Exclusion does not modify or limit the coverage provided under Covered Risk 7 or 8. Defects, liens, encumbrances, adverse claims, or other matters (a) created, suffered, assumed, or agreed to by the Insured Claimant; (b) not Known to the Company, not recorded in the Public Records at Date of Policy, but Known to the Insured Claimant and not disclosed in writing to the Company by the Insured Claimant prior to the date the Insured Claimant became an Insured under this policy; (c) resulting in no loss or damage to the Insured Claimant, (d) attaching or created subsequent to Date of Policy (however, this does not modify or limit the coverage provided under Covered Risk 11, 13, or 14); or (e) resulting in loss or damage that world not have been sustained if the Insured Claimant had paid value for the Insured Mortgage. 4. Unenforceability of the lien of the Insured Mortgage because of the inability or failure of an Insured to comply with applicable doing -business laws of the state where the Land is situated. 5. Invalidity or unenforceability in whole or in part of the lien of the Insured Morbgage that arises out of the transacUcin evidenced by the Insured Mortgage and is based upon usury or any consumer credit protection or truth -in -lending law. 6. Any claim, by reason of the operation of federal bankruptcy, state insolvency, or similar creditors' rights laws, that the transaction creating the lien of the Insured Mortgage, is (a) a fraudulent conveyance or fraudulent transfer, or (b) a preferential transfer for any reason not stated in Covered Risk 13(b) of this policy. 7. Any lien on the Title for real estate taxes or assessments imposed by governmental authority and created or attaching between Date of Policy and the date of recording of the Insured Mortgage in the Public Records. This Exclusion does not modify or limit the coverage provided under Covered Risk 11(b). EXCEPTIONS FROM COVERAGE — SCHEDULE B, PART 1, SECTION ONE This policy does not insure against loss or damage (and the Company will not pay costs, attorneys' fees or expenses) that arise by reason of: 1. (a) Taxes or assessments that are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the Public Records; (b) proceedings by a public agency that may result in taxes or assessments, or notices of suchin whether or not shown by the records of such agency or by the Public Records.Ptd, 2. Any facts, rights, interests, or claims that are not shown by the Public Records but that could be ascertained by an it specbm of the Land or that may be asserted by persons in possession of the Land. 3. Easements, liens or encumbrances, or claims thereof, not shown by the Public Records. 4. Any encroachment, encumbrance, violation, variation, or adverse circumstance affecting the Title that would be disclosed by an accurate and complete land survey of the Land and not shown by the Public Records. 5. (a) Unpatented mining claims; (b) reservations or exceptions in patents or in Acts authorizing the issuance thereof; (c) water rights, claims or title to water, whether or not the matters excepted under (a), (b), or (c) are drown by the Public Records. 6. Any lien or right to a lien for services, labor or material not shown by the public records. Page 2 of 2 Old Republic Title, Ltd. Privacy Policy Notice PURPOSE OF THIS NOTICE Title V of the Gramm -Leach -Bliley Act (GLBA) generally prohibits any financial institution, directly or through its affiliates, from sharing nonpublic personal information about you with a nonaffiliated third party unless the institution provides you with a notice of its privacy policies and practices, such as the type of information that it collects about you and the categories of persons or entities to whom it may be disclosed. In compliance with the GLBA, we are providing you with this document, which notifies you of the privacy policies and practices of Old Republic Title, Ltd. We may collect nonpublic personal information about you from the following sources: Information we receive from you such as on applications or other forms. Information about your transactions we secure from our flies, or from [our affiliates or] others. Information we receive from a consumer reporting agency. Information that we receive from others involved in your transaction, such as the real estate agent or lender. Unless it is specifically stated otherwise in an amended Privacy Policy Notice, no additional nonpublic personal information will be collected about you. We may disclose any of the above information that we collect about our customers or former customers to our affiliates or to nonaffiliated third parties as permitted by law. We also may disclose this information about our customers or former customers to the following types of nonaffiliated companies that perform marketing services on our behalf or with whom we have joint marketing agreements: Financial service providers such as companies engaged in banking, consumer finance, securities and insurance. Non-financial companies such as envelope staffers and other fulfillment service providers. WE DO NOT DISCLOSE ANY NONPUBLIC PERSONAL INFORMATION ABOUT YOU WITH ANYONE FOR ANY PURPOSE THAT IS NOT SPECIFICALLY PERMITTED BY LAW. We restrict access to nonpublic personal information about you to those employees who need do know that information in order to provide products or services to you. We maintain physical, electronic, and procedural safeguards that comply with federal regulations to guard your nonpublic personal information. ORT 287-0 5/07/01 N.1 3- i �-2 79 S6 N 47 '6.i 70-3? 14J.-4 TQ.76 u.ilY -i r °_.s AL 4426 - 47 y 38.:, �49 :in 51 W 52 1 3F A[6l SF 940_ ar 040l JF RAVI SF 6431 SF BcAI ]F' a 0215 QZ417 0243 3250 UW? 8760 r.h. 56 7]. 7 :a.[ 70. :6_t 76.]4s` ._: so + .. ... ,, .-.... o.ta pc E 21St St NE 21ST ST ' -M.LUA 6LOT 3 -LO1 LOT 6 LOT 7� 303Qr nO- 9394 195 ' .`- >: 9257 so ".14 189 210E6 SP 406 41- v 9Q37 .2250 9J4a n 1 r+a 0.74 AC o NE 20th St t E ¢ m L73r o.+LOT 1 9TR 2 [ o1C 3 Q�805f CL eq :17 1. 12 MY E"!iu a__45C1 SN 9x77 iii 4 :�. y'M r s LOT 2 _ ,cs 03.41 Z los-31 am" 777!6 s ls.to 67.00 ns. .' > ss I1 .2 •" / sr 9109 rli ,° a 11, ia7B `a Ql om 0060 R.Nr. 1[9 Z { �. 11i97? ilia 4 RSN.SP 140-78 TP0815EG12 z R, 1320 ; Z f„, �. 5164 SF i OC40 LOT LOTt >.-.. s F _ ,. L. +..� 9333 y r rJ� !' ��•3 3 SF Z.4 1754 SF 3o99i63 2; i 1130- it L } Y 63 01-0 k �xF q i t 41 aw 1 X40Y �2 bi2! 5� :74+0 SF �'1 €14 Z [� Z r VJ 11#4 Cf! a, 0420 9297 2IE } . 4 _j+•� Q N 69-01-C7 A [L �Z 4;.p0 _ _ REN. P 411A u&.5WPL O Z Qz ~'_ oi3o R- a ++kms° ► LCrj N z 115 vU 9' 0D1G L� 2 r 1 t ' 4568 4 Lai i r- . � ' A1 . .yt.;p 0759 E:.f r tOfA ..a -rt 0 9349 „_t34 '•e.83`a st' ;• yW :�•'EiSQ 4a2o� z <AA r• M E 19th 5 t N.E. S 9 TH ST. NE 19TH_ ST R N J This map has been copied from the Q8. �+ ���,U�I. £ }* , , ■ o ,, " public records and is provided solely for the ting the premises. No liabilities are assumed for purpose of assisting in l7or inaccuracies contained in or for varlatlons, if any, in dimensions, area or ■ location of the premisesthe location of improvements ascertained by survey. actual Return Address: City Clerk's Office City of Renton 1055 South Grady Way Renton, WA 98055 Title: DEED OF DEDICATION ProTax Parcel Number: 042305-9077 tmjeet Number. LUA-xx-xxx, SHPL Street Intersection or Project Name: 2001 Union Ave NE Reference Number(s) of Docrm mts assipLd or released: Additional reference numbers are onpage Grantor(s): Grantee(s)- 1 KushaI Varma and "al Rain 1. City of Renton, a Municipal Corporation LEGAL DESCRIPTION: (Abbreviated or full legal description MUST go here. Additional legal on page 2) TRACT 2, COUNTY OF KING SHORT SUBDIVISION NO 677115, RECORDED UNDER KING COUNTY RECORDING NUMBER 7712130605, RECORDS OF KING COUNTY, WASINGTON SITUATE IN THE COUNTY OF KING, STATE OF WASHINGTON. The Grantor, as named above, for and inconsideration of mutual benefits com e�y s quit clam,ts. &-dicatts and dona? c 'I Gmtee(s) as named Shove, the following described rezi esTale situaltd ;n uht ctaL mai of milli . Statle1b:;7 dedication is required as a condition for development of property. IN WITNESS WHEREOF, said Grantor has caused this instrument to be executed this day of 2Q GRANTOR(S) Mayor GRANTOR(S) Cary Cleric n1D1111'DUAL FORM OF STATE OF WASHINGTON } SS ACKNOWL EOGMFNT COUNTY OF KING } I certify that I know or have satisfactory evidence that Notary Seal must be within box 'signed this instrument and Acknowledged it to be hisiherltheir free and voluntary act foo- ti.ez aiid purposes mentioned in the instm meat. Notary Public in and for the State of Washington Notary (Print) My appointment expires _ _ Dated: JLC. 1 4 )i,,. EDIT A Legal Description THAT PORTION OF LAND OF TRACT 2, OF COUNTY OF KING SUBDIVISION NO. 677115, RECORDED UNDER KING COUNTY RECORDING NO 77123 30605, RECORDS OF KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS. BEGINNING AT THE NORTHEAST CORNER OF SAID TR. -ACT 2 BEING THE. TRUE POINT OF RE'.CINNMTG: TMT CE NORTI 18 9' I9 25�,T A 'DISTA N CE 0F 3.>f-) FEET: TfIFIN C T- SOUTH 000 03'i31'° EAST ;i DISTANCE OF 1216.11 FEET; ME.NCE SOUTH 89 i 1'02' EAST A DISTANCE OF 8.50 FEET TO THE WESTERLY 1ekR63N OF UNJOiN AVE NF:; THEINC E NORTH 00-01 10 1 "+'ESi ALONG SAl3? W"T'STER.LV MARGIN A DiS i :ANCi_, OF i? 1.1 i FE.3 i i I I i 7 Paget 1 EXIEUBIT B Map Page E_ 1/4 CORNER SECTION 4-23-5, FOUND 3" DESK IN MONUMENT CASE. CITY OF REN TON #1325, i VISITED MAR 2014, EL=444.763' o NE CORNER OF o� TRACT 2 N S89819'25"E =I LOT 1 DED. 1,029 sq.ft. S8917'02"E 80.00' 8.50'J a 0 0 0 N [.n N TRACT B CD S89°1 /'02"E 8.50' S8919'25"E - 30.00' - CD a 6 Page3 AFFIDAVIT OF INSTALLATION OF PUBLIC INFORMATION SIGN STATE OF WASHINGTON COUNTY OF KING City of Renton Planning Division 1055 South Grady Way, Renton, WA 98057 Phone: 425-430-7200 Fax: 425-430-7231 1�v-yvket n _ keine first duly sworn on oath, deposes and says: L On the day of20� I installed public information sign(s) and plastic flyer box on the property located at for the following project: Project Name Owner Name 2. 1 have attached a copy of the neighborhood detail map marked with an '7t" to indicate the location of the installed sign. 3. This/these public information sign(s) was/were constructed and installed in locations in conformance with the requirements of Chapter 7 Title 4 of Renton Municipal Code and the City's "Public informatiorl,rSignS Install on" handout package. i, � ;w / Installer Signature SUBSCRIBED AND SWORN to before me this d�- Gl 20_,�,/ . MOUN#R H, i OUA �C NOTAFY PUBLIC in and for the State of Washington, 7 STAYS :. V, ',;;TON residing a -t MY pg-pg-� My commission expires on -3 _..__ H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\pubsign,dm .J U L. 1 4 2014 45/14 RECEIPT EGO0025798 BILLING CONTACT Kajal Ram 2016 LINCOLN PL NE RENTON, WA 98056 City of F Transaction Date: July 14, 2014 REFERENCE NUMBER FEE NAME TRANSACTION PAYMENT AMOUNT PAID TYPE METHOD LUA14-000916 PLAN - Short Plat Fee Technology Fee Fee Payment Check #2120 $1,400.00 Fee Payment Check #2120 $42.00 SUB TOTAL $1,442.00 TOTAL $1,442.00 c�� DL OL �+ RI j �b_yr " N z � �J 7 •96 m ° h l U) ^+� p n o m F, CI• aC�; �.<b. 3 65--BL-Z�:9 gb� A`. r ,n' �,' 6I,CF•0 49 td 1'1'�. 6 _ �n (O 5E-F�•4N~ '2.Fa` i rn jru F N 3 3'39 -A3 W uv r lrZ .'� n OOT i I jN E8"99 62 b�9£ �'.' 11/• 26'6,39 " u ,n Sy r., m Irl ujI W w cn N r; _' a v N �. r r n r r cn n O -i a Ld r Z91, r .S 0'6Z w rtl ,y (o 4ty •86 '�°n" 001 c 2• n 9 N y oA uw w 4' LLI a c 0•r4 OB '�°�� `v w umi rn w- ¢96"Sd �a� W ;' � `� �' � d � •� •. o, �' � �, r,l I I '7d tib Ob Sb S6 14. --`- S9 •� �,' r+ r" � 0S S� � � w t- m Ti'60T N j .(�'-, 6[� 60. ,69£•Sb a <z { I e 0 �Z Z9 • .. si � jC a°� i P r- 8 N ^ r �� u�i h � I � rs^d' w PA ` �2 ��• a �. 3 SSS w o �I rI m ;4 SC.. Fb�gz ZO 2 r o Sp Z9 RE -9 I-8 N BZ 0fi r 3 64 -4Z -Z N16 - to w rn N N SS ry r m 3 3 k, LS'OL i� D £0T OOT h I m ry m �'� e ���A{'II"'- ,y ^b w a• m 6b-bZ-ZEN m � O ^� a 'y�•7 �L, Oq ^i r `i I n P m 3 ry � � o � t=, r [f14i� N S2 j SZ $9 u) I O$ '7 r5:' cn 00 F9 m m N SZ N O,.i 1 zt:. wh "7w :^ Ig •\ Z o o m Nil 2'1 r r] N 'r 89 -- Q o. [ E �• ps 3 4 W c �._.. _ q ti a : & e� m 61 2 L.$' Z6 1 -40"O a _ o _ cE' PC LO OS'. OL 5S66 A�1 3 66 -5Z -Z N jr. N r �'l S A O/ ii O Lo' SC"- 4• <j•6 ...9L N and NOH O1 � I a �! �+ N r9 N N OZ� ¢- w•m �3A `� cC, -a9 Imo' o umi jQ:� `n0 yam• ' 62JJ ry 'nIm ! r'i ") ,� •vN r a w n r� a'. : x s r -i �i r) 2 In F Io �1 �< -,Lws9 hd i -E N_901 _-....... z' ; an' `° .. 0 88 90L4£ c5 -S5, N 06�F.,OL ri; 3 8S-BSY 4 N':., N v -.�.._ _---- . .7 ----------- I .- '-"U - '� T T ` 91' i9T �� r F 10� . o�i•� Ian � 0l r , 9 65 -SS -T N r �...—•51. 51.13 N I o ,� w o ' m �.. e n rn o' u� n p3 A o OE' ZE OE' ZE o h N, AA 8TT ES'6 4g a lF. ti 3 BS -85 46 F Fj <v r,n: Iry P- i�iq o 6fr $5-85-00 rGmo 9Z•L LL'Bbl. O f r O 62. �.E� 8 ...� ...�i •D9 yA is �ry z' z% d rn 4 OFT U h o N o :, is ,n i.N-i N ry4 E9 r rC N r o N r t ~ o "3'N IC I 13 65-55•,, N : to rn � M w �,N-I � � `' I Oh�3 �+_ I Pj ❑ Him I �$r 26 oe H 6 _ as- N�..60m.oN OB'EST M 56'LE-ZO s I' N 98 m S -1d D r �b III s ry�lll m� Q % 9, E9 4E•09 .i FZ EZ 3 OL 3 91.19 89[;,79 ti ry TT w h ~ W U 11 _1 1 S"} O ,� ✓} In O m b• Ql 01 65 Q1 o a m I +� ° I ^ w la O Q. I O' ti m m �j SN7b Z e ;"� I SOLG�EjES'STi.... 'ZG SC E9"6S OF N OOi ZS'E8 OZT 50'SST :4 9S -6S-00 N t "SZ: `.£0'69 09 OF 6L "L5 OG o '3•N 'EIAV NOINfI z:00067z9ozoaZ 03 N '3Atl NOINfI •T f'a's} a fis-ss-T N Lm-w-vmdSNLl �' • �, IrlEdId ouvisi �iaz)v3w log , a ooe 6s -ss -T N 3S NZEL j I 3N 3AV NOINn css 3nv ONZET? n OT I SSS ZT'D6 ,n j OFT W611 C£ LZT 09 T"T OS 08 0E flZ OB w Ob jc d N 'C I rn i w •� O U a � o 0) � 'i W ' g IB"6IT I _ Ss s9 m I oe I of a r Z Ozi tu f � 65-55-T�N� CZT 6S"6Tl �; �° al4 _ _ _ _ OOT fifi"Zlz I� v cv n cl �OL ATL L OD SS 6 o`s {r o I o r NL I N rn c U {• O5'6TT a d' 4 IO' LOT a u e 1 4 a j m o Q o c o n aal TB'TL s T9'EZ 0075 j m N I o se aN .lunoo o w A a a: v ; SY- � W 6 ' o r s w � rn BT'DQT �, ,�< r I � n 95 TO"LOT w 06 I m c In o + T a �� u � ��..-'�O w-IZ L•Ga � p� ' TO' LOT I a I u, Ft ilf c, " o TO'LOT m u� W Z co 0 0 0 6TI ? 99 C] IO'08 p•g 5L�'. i009 lo - n ---o -Eii' o w Lu Irh W TO'LOT o z r lD S ,im d• o + "'. °° --—..._... ZO_LOi •--_..._..• ZL"ODZ 6E1 p6 N n vHi; C9 COP o tea' O EL'$Tl 0 N h m I 6s•BTT V ry o � M