HomeMy WebLinkAboutMiscTECHNICAL INFORMATION REPORT (FULL DRAINAGE REVIEW) Shuttle Express Parking Lot Parcel #: 3340406430 Addres.~: 800 SW 16'h Street, Renton, WA August 2,20/3 Owner: Peer Frank, LLC A tin: Devin Sherrell 800 SW f(ih Street Renton, WA 98057 Phone: (425) 98/-7069 OICIG ; [ For Submittal to City of Renton DAVIDO CONSULTING GROUP, INC. CIVIL· STRUCTURAL· LAND USE 15029 Bothell Way NE, Ste 600 Lake Forest Park, WA 98155 Phone: 206,523,0024 Fax: 206,523.1012 PO Box 1132 Freeland, W A 98249 Phone: 360.331.4131 Fax: 360.331.7394 Technical Information Report Shuttle Express Parking Lot-800 SW 16 th Street August 2, 2013 CERTIFICATE OF ENGINEER The technical material and data contained within this report has been prepared by or under the direction of the following registered professional engineer(s), licensed in accordance with the laws of the State of Washington to practice in the State of Washington. DavidQ Consulting Group, Inc. TIR_Shutt1e Express.doc Page i Technical Information Report Shuttle Express Parking Lot-800 SW 16th Street August 2, 20 l3 QUICK REFERENCE PROJECT INFORMA nON General Project Information r---------------------- I Project Description I Parcel # Site Address Parcel Size Project Size OwnerlDeveloper Consulting Engineer Drainage Study Area Drainage Requirements Tributary Drainage Area & Land Cover Summary Soils Drainage Improv~ments . ESC Measures Davido Consulting Group, Inc. T1R_Shuttle Express.doc Construction of an approximately 15,000 SF porous asphalt parking lot for Shuttle Express in Renton, W A. 3340406430 8()0. SW 16m St, Renton, W A .- 141,425 SF (3.25 Acres) :f3)82SF 0.01 Acres) -------------- Peer Frank, LLC Attn: Devin Sherrell 800 SW 16th Street Renton, W A 98057 Phone: (425) 981-7069 Quin Clements, P.E. -Davido Consulting Group, Inc. P.O. Box 1132 Freeland, W A 98249 Phone: (3601331-~ 131 --------------------------------- The study area is the site itself as no surface flow is leaving the site or entering the site from adjacent properties. Full Drainage Review Requirements per the 2009 King County Surface Water Design Manual (KCSWDM) and City of Renton Amendments to the KCSWDM (combination of which is hereafter referred to as The Manual). Predeveloped Conditions: ' Redeveloped Conditions: Impervious = 8,880 SF Impervious = 25,439 SF PGIS = 6,585 SF PGIS = 21,427 SF Pervious Surface = 34,902 SF Pervious Surface = 18,343 SF Total = 43,782 SF Total = 43,782 SF ._------ Geotechnical analysis and report completed by Nelson . geotechnical Associate.s, Inc. Low Impact Development (LID) Best Management Practices (BMPs) are proposed comprised of porous asphalt. ESC measures per Full Drainage Requirements Page ii Technical Information Report Shuttle Express Parking Lot-800 SW 16 th Street August 2, 2013 TABLE OF CONTENTS I. Project Overview ......................................................................................................... .5 1.1 General Description of Proposal ................................................................................... 5 1.2 Existing Site Conditions ............................................................................................... 6 1.3 Developed Site Conditions ............................................................................................ 6 1.4 Site Area and Size ofimprovements ............................................................................. 6 1.5 Disposition of Storm water before Project.. .................................................................... 7 1.6 Disposition of Stormwater after Project ........................................................................ 7 1.7 Soils ............................................................................................................................. 7 2. Conditions and Requirements Summary ....................................................................... 9 2.1 Core Requirement #1: Discharge at Natural Location ................................................... 9 2.2 Core Requirement #2: Off site Analysis ......................................................................... 9 2.3 Core Requirement #3: Flow Control ............................................................................. 9 2.4 Core Requirement #4: Conveyance System ................................................................... 9 2.5 Core Requirement #5: Erosion and Sediment Control ................................................... 9 2.6 Core Requirement #6: Maintenance and Operations .................................................... 1 0 2.7 Core Requirement #7: Financial Guarantees and Liability ........................................... IO 2.8 Core Requirement #8: Water Quality .......................................................................... 10 2.9 Special Requirement #1: Other Adopted Area-Specific Requirements ........................ 10 2.10 Special Requirement #2: Flood Hazard Area Delineation ............................................ 10 2.11 Special Requirement #3: Flood Protection Facilities ................................................... 10 2.12 Special Requirement #4: Source ControL ................................................................... 10 2. \3 Special Requirement #5: Oil Control .......................................................................... 10 2.14 Special Requirement #6: Aquifer Protection Area ....................................................... 10 3. Offsite Analysis .......................................................................................................... 11 4. Flow Control and Water Quality Facility Analysis and Design .................................... 11 4.1 Existing Site Hydrology .............................................................................................. 11 4.2 Developed Site Hydrology .......................................................................................... 11 4.3 Performance Standards ............................................................................................... 11 4.4 Flow Control System .................................................................................................. 12 4.4.1 KCRTS Modeling .................................................................................................. 12 4.5 Water Quality System ................................................................................................. 12 4.5.1 Soil Treatment Liner .............................................................................................. 12 5. Conveyance System Analysis and Design ................................................................... \3 5.1 Existing Conveyance .................................................................................................. 13 5.2 Proposed Conveyance ................................................................................................. 13 6. Special Reports and Studies ........................................................................................ 13 7. Other Permits .............................................................................................................. 14 8. CSWPPP Analysis and Design ................................................................................... 14 8.1 ESC Plan Analysis and Design ................................................................................... 14 8.2 Stormwater Pollution Prevention and Spill Plan Design .............................................. 15 9. Bond Quantities, Facility Summaries, and Declaration of Covenants .......................... 16 10. Operations and Maintenance Manual .......................................................................... 16 Davido Consulting Group, Inc. TIR_Shuttle Express.doc Page iii Technical Information Report Shuttle Express Parking Lot-800 SW 16'h Street APPENDICES APPENDIX A Figure I -Technical Information Report (TIR) Worksheet APPENDIX B Geotechnical Report APPENDIX C Site Improvement Plans APPENDIX D Temporary Erosion and Sediment Control Plan APPENDIX E Operation and Maintenance APPENDIX F Bond Quantity Worksheet APPENDIX G Stormwater Facility Summary Sheet APPENDIX H KCRTS Modeling Results APPENDIX I Conveyance Calculations LIST OF TABLES August 2, 2013 TABLE I TABLE 2 TABLE 3 Site Area and Size ofimprovements ..................................................................... 6 Facilities Summary ............................................................................................. 12 Proposed ESC Measures and Construction Sequencing ....................................... 15 LIST OF FIGURES FIGURE I TIR Worksheet.. .............................................................. APPENDIX A FIGURE 2 Site Location ....................................................................................................... .5 FIGURE 3 Drainage Basins, Subbasins, and Site Characteristics ............................................ 8 Davido Consulting Group, Inc T1R_Shuttle Express.doc Page iv Technical Information Report Shuttle Express Parking Lot-800 SW 16'h Street August 2, 2013 1. PROJECT OVERVIEW The project involves the construction of an approximately 15,000 SF porous asphalt parking lot to the south ofthe existing Shuttle Express building at 800 SW 16 th Street in Renton, Washington (see FIGURE 2). The project site is slightly over an acre in area and is a small portion of a larger parcel. The project will adhere to the 2009 King County Surface Water Design Manual (KCSWDM) as well as the 2010 City of Renton Amendments to the KCSWDM, the combination of which is hereafter known as "The Manual". Given The Manual, the project is subject to Full Drainage Review, as specified in Section 1.1 of The Manual. This report follows the Technical Information Report (TIR) requirements for Full Drainage Review per The Manual. The TIR worksheet is attached as FIGURE I in APPENDIX A. FIGURE 2 Site Location 1.1 General Description of Proposal The project involves the construction of an approximately 15,000 SF porous asphalt parking lot with inmress from an existing driveway otT of SW 16'h Street and egress connecting directly to SW 16' Street. The project will also include site drainage, grading, and landscaping. Frontage improvements to SW 16 th Street, which includes an 8-foot landscape strip and 6-foot wide sidewalk, are included in this project as well. Davido Consulting Group, Inc. TlR_Shuttle Express.doc Page 5 Technical Information Report Shnttle Express Parking Lot-800 SW 16 th Street August 2, 2013 1.2 Existing Site Conditions The existing site is accessed via an asphalt driveway from SW 16 th Street. The existing site conditions include a driveway and parking area to the east of the Shuttle Express building, lawn, and trees. The majority of the area that will be disturbed will be the lawn area to the south of the Shuttle Express building. However, a small portion ofthe existing asphalt parking area will be replaced with porous asphalt. TABLE I summarizes the existing site land cover. The drainage basin is the project limits itself as no offsite flow enters the site's drainage system. 1.3 Developed Site Conditions The developed site conditions, shown in the project plans submitted under separate cover, will include a new 15,000 SF porous asphalt parking lot to the south ofthe existing Shuttle Express building. The new parking lot will be used for a combination of bus and employee parking. Stormwater runoff from the developed site will infiltrate through the porous asphalt, which will include a 6-inch thick storage layer of rock for stormwater storage. Overflow fur the permeable pavement facility will be a catch basin conveyance system designed to capture and convey all stormwaterto the City's system in SW 16th Street. TABLE I summarizes the developed site conditions and land cover and the developed site drainage basin is shown in FIGURE 3. 1.4 Site Area and Size of Improvements The pre-developed and developed site area and size ofimprovements are shown in FIGURE 3 and summarized in TABLE 1. TABLE 1 Site Area and Size ofImprovements Project Site Areas Existing Developed SF Acres SF Acres Impervious Areas: Concrete Walkway 1,900 0.04 1,900 0.04 Asphalt 6,585 0.15 6,559 0.15 Gravel 395 0.01 Porous Asphalt 14,868 0.34 Concrete Sidewalk 2,112 0.05 Total Impervious Surface 8,880 0.20 25,439 0.58 Total New/Replaced Impervious Surface: 14,868 0.34 Total Pollution Generating Impervious Surface: 6,585 0.15 21,427 0.49 Total New/Replaced Pollution Generating Impervious Surface: 14,868 0.34 Pervious Areas: Landscaping 34,902 0.80 18,343 0.42 Total Pervious Surface 34,902 0.80 18,343 0.42 Total Project Site Area 43,782 1.01 43,782 1.01 The land cover areas in TABLE I were determined by area measurements in AutoCAD from a topographic survey performed on May 15, 2013. As shown by TABLE 1, the developed site is Davida Consulting Group. Inc TIR_Shuttle Express_doc Page 6 Technical Information Report Shuttle Express Parking Lot-800 SW 16'h Street August 2, 2013 adding 14,868 SF of new impervious surface. The porous asphalt parking lot will make up the entirety of the impervious surface, therefore adding 14,868 SF of PGlS as well. These areas represent the site coverage in the basin draining to the proposed permeable pavement facility. 1.5 Disposition of Stormwater before Project As shown by TABLE I, the majority of the existing site coverage is grass. Any stormwater runoff that does not infiltrate sheet flows southerly across the site into a catch basin near the south property line. The catch basin connects to the City's storm system on the north side ofSW 16th Street. 1.6 Disposition of Stormwater after Project The developed site stormwater will infiltrate through the porous asphalt where there will be a 6" rock pocket underneath for storage. The permeable pavement facility is sized to handle all the stormwater from a 100-year storm. Only during extreme events (greater than any event in the available data in KCRTS), a rain on snow event for example, or if the permeable pavement gets clogged and is unable to allow stormwater to infiltrate, will stormwater leave the site through an overflow system. The overflow system will be comprised of new Type 1 catch basins with 8-12" storm drain pipes connected to the City'S system at an existing Type 1 catch basin in the north side ofSW 16'h Street (see APPENDIX C for the site improvement plans). 1.7 Soils A geotechnical investigation was completed by Nelson Geotechnical Associates, Inc. (NGA). The results ofthis investigation are summarized in a report dated June 21,2013; a copy ofthe report is attached in APPENDIX B. The NGA report includes investigation findings and recommendations for the stormwater infiltration system. NGA dug four test pits on June 3, 2013 to depths between 8.5 and 12.0 feet. In all four test pits topsoil and grass was underlain by approximately 3.8 to 4.8 feet of medium dense to dense, brown gray fine sand with silt, trace gravel and varying amounts of organics which is thought to be undocumented fill. Below the fill layer is a loose/soft, iron-oxide stained, native alluvium soils layer. All four test pits were terminated within the alluvium soils layer. NGA also conducted two on-site infiltration tests in the parking lot area. The measured infiltration rates from the two tests were 6.92 and 13.84 inches per hour. However, based on their observations and the varying nature of the underlying soils throughout the site, NGA recommended using a 0.5 inch per hour infiltration rate for stormwater modeling. The Manual requires a minimum of three feet of permeable soil below the bottom of an infiltration facility, and at least three feet of separation from the bottom ofthe infiltration facility to the maximum wet-season water table. The NGA geotechnical report states that because the subsurface soils have a high silt content and indications of shallow groundwater, the site subsurface soils are poorly suited for traditional stormwater infiltration trenches. However, NGA does recommend the use of pervious pavement surfacing to allow runoff from the parking lot to infiltrate into the granular fill layer found within the site. The full NGA report is attached in APPENDIX B. Davido Comulting Group. Inc. TlR_Shuttle Express.doc Page 7 Technical Information Report Shuttle Express Parking Lot-800 SW 16 th Street FIGURE 3 Davjdo Consulting Group, Inc TIR_Shuttle Express.doc Drainage Basins, Subbasins, and Site Characteristics (insert AutoCAD drawing Figure 3) Page 8 August 2, 2013 Technical Information Report Shuttle Express Parking Lot-800 SW 16'h Street August 2, 2013 2. CONDITIONS AND REQUIREMENTS SUMMARY The project conditions and requirements were stipulated in the KCSWDM and by the City of Renton Amendments to the KCSWDM. The project conditions and requirements are summarized as follows: ~ The project is subject to Full Drainage Review requirements specified in Section 1.1.2 of the Manual (>2,000 SF impervious surfaces). ~ The project is subject to Levell flow control (or Peak Rate Flow Control Standard). ~ The project is subject to basic water quality requirements (>5,000 SF new or replaced POI S will be created). The following sections address The Manual's core and special requirements. 2.1 Core Requirement #1: Discharge at Natural Location The proposed drainage system has been sized to infiltrate the 100-year storm onsite. Therefore, the proposed drainage system will emulate the natural pre-developed conditions of the site as much as possible and the overflow entering the downstream drainage system will maintain the natural drainage course from the site, thus satisfYing Core Requirement #1 of The Manual (see Sections 1.5 and 1.6). 2.2 Core Requirement #2: OtTsite Analysis Stormwater will be infiltrated onsite through a permeable pavement facility and the project will not change the rate, volume, duration, or location of discharges to and from the site. Therefore, the project is not required to submit an offsite analysis report based on exemption #3 on Page 1- 21 of the Renton Amendments to the KCSWDM. 2.3 Core Requirement #3: Flow Control The proposed onsite infiltration facility infiltrates and detains 100% ofthe stormwater runoff (based on full periods ofrecord/data in KCRTS), therefore satisfYing the requirements for flow control. See Section 4 for the infiltration facility design. 2.4 Core Requirement #4: Conveyance System The new conveyance system consists of Type 1 catch basins and 8-inch and 12-inch storm drain pipe. The conveyance system will be utilized as an overflow system for the permeable pavement facility and will connect to an existing catch basin in SW 16 th Street (see Section 5). 2.5 Core Requirement #5: Erosion and Sediment Control Erosion and sediment control (ESC) measures have been designed for the project in accordance with Section 1.2.5 of The Manual to prevent the transport of sediment from the site to adjacent properties and downstream drainage facilities during construction. Temporary measures include a stabilized construction entrance, silt fencing, tree protection fencing, and inlet protection at impacted catch basins. Permanent measures to reduce the potential for erosion includes the proposed permeable pavement facility and the reseeding of disturbed areas (see ESC plan in APPENDIX D and Section 8.1). Davido Consulting Group, Inc. TIR _Shuttle Express.doc Page 9 Technical Information Report Shuttle Express Parking Lot-800 SW 16 th Street August 2, 2013 2.6 Core Requirement #6: Maintenance and Operations The proposed drainage facilities will follow the operation and maintenance guidelines as stipulated in Appendix A of The Manual. An operation and maintenance manual consistent with Appendix A of The Manual has been provided in APPENDIX E of this report. 2.7 Core Requirement #7: Financial Guarantees and Liability A bond quantities worksheet has been completed and attached as APPENDIX F (see Section 9). The owner must submit a construction bond to the City of Renton for not less than 100 percent of the amount calculated in the bond quantity worksheet. The owner must also file a maintenance bond with the City of Renton before any drainage improvements will be accepted. 2.8 Core Requirement #8: Water Quality Since the project site is classified as an industrial site and will add more than 5,000 square feet of pollution generating impervious surface, enhanced basic water quality is required. However, since the entire site runoff will be infiltrated according to the standards in Section 5.4 of The Manual, the enhanced basic water quality requirement is reduced to basic water quality treatment per Exception #2 on Page 1-64 of The Manual. Permeable pavement with an underlying treatment layer will be used to provide basic water quality to the site's runo ff (see Section 4.5). 2.9 Special Requirement #1: Other Adopted Area-Specific Requirements The project is exempt from Special Requirement # I because there are no area specific requirements applicable to the project site. 2.10 Special Requirement #2: Flood Hazard Area Delineation The parcel in which the project site is located contains a Special Flood Zone which is classified as a 100-year flood plain. However, no development will occur within the flood plain for this project. Therefore, the project is exempt from Special Requirement #2. 2.11 Special Requirement #3: Flood Protection Facilities The project is exempt from Special Requirement #3 because it will not rely on an existing flood protection facility (such as a levee or revetment) for protection against hazards posed by erosion or inundation and will not modifY or construct a new flood protection facility. 2.12 Special Requirement #4: Source Control The project is exempt from Special Requirement #4 because the project does not require a commercial building or commercial site development. 2.13 Special Requirement #5: Oil Control The project is exempt from Special Requirement #5 because it does not trigger oil control requirements since the project site is under the high-use site thresholds. 2.14 Special Requirement #6: Aquifer Protection Area The project is exempt from Special Requirement #6 because it is not located in Zone I or Zone 2 of the Aquifer Protection Areas identified in Reference II-B of The Manual. Davido Consulting Group. Inc. TIR_Shuttle Express,doc Page \0 Technical Information Report Shuttle Express Parking Lot-800 SW 16th Street August 2, 2013 3. OFFSITE ANALYSIS Stormwater from the proposed development will be infiltrated onsite through permeable pavement (porous asphalt) and the project will not change the rate, volume, duration, or location of discharges to and from the site, Therefore, the project is not required to submit an offsite analysis report based on exemption #3 on Page 1-21 of the Renton Amendments to the KCSWDM. 4. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN The following sections summarize the stormwater flow control and water quality facility analysis and design. 4.1 Existing Site Hydrology The existing site is mostly grass with some landscaping and generally slopes southerly away from the existing building. The underlying soils are undocumented fill and alluvium with an estimated infiltration rate of 0.5 inches per hour (see section 1.7 and APPENDIX B for more information on the site soils). Any surface water that does not infiltrate sheet flows towards SW 16 th Street and adjacent properties and enters existing storm systems. See Section 1.2 and TABLE I for more information on the existing site. 4.2 Developed Site Hydrology The developed site will consist of approximately 15,000 square feet (0.34 acres) of new plus replaced impervious surface. The new and replaced impervious surface will be permeable pavement, with the majority ofthe permeable pavement replacing existing grass. The permeable pavement will have an underlying rock pocket large enough to detain and infiltrate the 100-year storm. See FIGURE 3 for the developed drainage basin map and APPENDIX B for onsite soils information. See Sections 4.4 for more information on the permeable pavement facility design. 4.3 Performance Standards • The project site lies within the Peak Rate Flow Control Standard area determined from the City of Renton Flow Control Applications Map and must comply with the requirements stipulated in Section 1.2.3.1 of The Manual. • The project is exempt from all flow control BMP requirements because all runoff will be infiltrated onsite through the permeable pavement facility. • All conveyance pipes in the overflow system must be designed in accordance with Section 1.2.4 of The Manual and shall be sized with sufficient capacity to convey and contain, at minimum, the 25-year peak flow. • The project site is an industrial site and is subject to the Enhanced Basic Water Quality Menu as stipulated by The Manual. However, since all runoff from the proposed site will infiltrate through the permeable pavement facility, the Enhanced Basic Water Quality requirement is reduced to Basic Water Quality per Exception #2 of Page 1-64 of The Manual. Davida Consulting Group. Inc. TIR _Shuttle Express.doc Page II Technical Information Report Shuttle Express Parking Lot-800 SW 16'h Street August 2, 2013 4.4 Flow Control System As discussed in Section 2, the site is required to provide flow control satisfying the Peak Rate Flow Control Standard as stipulated in Section 1.2.3.1 of The Manual. The method of flow control will be full infiltration through the use of permeable pavement that includes a 6" rock pocket for stormwater storage. The rock storage layer has been sized in KCRTS and in accordance with The Manual. The tributary area to the infiltration facility is the permeable pavement parking lot itself. The developed areas used in the modeling for sizing of the facility are seen in APPENDIX H and explained in Section 4.4.1. A summary of the site's facilities is shown in TABLE 2. TABLE 2 Facilities Summary Facilities Summary Permeable Pavement Parking Lot (5) Type 1 Catch Basins (5) Spill Control Elbows 4.4.1 KCRTS Modeling The facility was sized in the KCRTS continuous event modeling program. Since all stormwater is being mitigated onsite through infiltration, matching the Peak Rate Flow Control Standard was not required. Developed conditions were based on impervious surfuce coverage. See the modeling results in APPENDIX H for additional design criteria. The infiltration rate used, 0.5 inches per hour, was stipulated by the geotechnical engineer, Khaled Shawish, in his memo dated June 21, 2013 (see APPENDIX B for the full geotechnical memorandum). The facility was sized by iteratively increasing the depth of rock pocket until the area required for storage was less than the area of the rock pocket. For structural stability of the permeable pavement section a minimum of6-inches of base course over the entire parking lot area is required. Since the rock pocket cannot be less than 6-inches thick, this was the beginning rock pocket depth used in the modeling. Modeling results show that a 6-inch rock pocket is sufficient to fully detain and infiltrate all stormwater and adds a factor of safety of2 to the required depth. See APPENDIX H for detailed KCRTS modeling results. The Drainage Plan submitted under separate cover shows the layout of the permeable pavement facility. 4.5 Water Quality System Water quality for the site is provided by a combination offacilities within the drainage system: a permeable pavement parking lot with a soil treatment liner beneath it and a spill control elbow located in each ofthe five catch basins in the case of an overflow. Since the permeable pavement facility is a fully infiltrating facility with a soil treatment liner, additional water quality is not required. 4.5.1 Soil Treatment Liner Per Section 6.2.4 of The Manual, water quality facilities in which water is in direct contact with the soil must be lined with either a low permeability liner or a treatment liner when the soil does not have properties which reduce the risk of groundwater contamination from storm water runoff that may infiltrate in the facility. Treatment liners must meet the requirements specified in The Davidu ConS/llling Group, Inc TIR_Shuttle F.xpress,doc Page 12 Technical Information Report Shuttle Express Parking Lot-800 SW 16 th Street August 2, 2013 Manual and be placed directly beneath the base rock of the infiltrating facility. A sand layer was chosen as the treatment liner from the options listed in Section 6.2.4.2 of The Manual and must be 12 inches in depth. Section 6.2.4 of The Manual explains that treatment liners amend the soil with materials that treat stormwater before it reaches more freely draining soils, thus satisfying basic water quality requirements. 5. CONVEYANCE SYSTEM ANALYSIS AND DESIGN The existing and proposed conveyance systems are discussed in the following sections. 5.1 Existing Conveyance The only existing conveyance structure on the project site is a Type I catch basin located in a grass area near the south property line. The catch basin captures sheet flow from the grass area in which it is located and conveys it southerly to a Type 2 catch basin in the north side ofSW 16th Street via an 8-inch PVC pipe. The Type 1 catch basin and 8-inch PVC pipe will be removed as a part 0 f th is project. 5.2 Proposed Conveyance The proposed conveyance system is comprised of new Type 1 catch basins and 8" and 12" PVC pipe connecting them to the City's storm system within SW 16 th Street. The conveyance system is a backup system only as the site has been designed to fully infiltrate all stormwater from the proposed development. The point of discharge to the City's stormwater system is located just off the southeast portion of the proposed parking lot. The overflow system will discharge stormwater via a 12" PVC pipe to an existing catch basin in S W 16 th Street. The 12" line has ample capacity to convey the modeled runofffrom the site. The 8" pipe between the new Type I catch basins have been sized to handle anticipated site runoff as well assuming full site runoff for a 100-year storm event with no attenuation from the porous asphalt (see APPENDIX I for conveyance calculations). The overflow for the site is the conveyance system described in the above paragraph. Normally, the stormwater will infiltrate through the permeable pavement facility, which has been sized to handle anticipated stormwater amounts. The overflow system will only be used when the porous asphalt is not allowing storrnwater to infiltrate through it due to clogging of the pores by ice, sediment, or any other obstruction. 6. SPECIAL REPORTS AND STUDIES A geotechnical report was completed by Nelson Geotechnical Associates, Inc. (NGA) on June 21, 2013. NGA dug four test pits on June 3, 2013 to depths between 8.5 and 12.0 feet. All four test pits encountered undocumented fill to depths of3.8 to 4.8 feet. Test Pit locations are shown on the Schematic Site Plan in APPENDIX B. See TABLE 1 for existing ground cover. See the Geotechnical memorandum in APPENDIX B for the full geotechnical report. Davida ConSUlting Group, Inc. TIR_Shuttle Express.doc Page 13 Technical Information Report Shuttle Express Parking Lot-800 SW 16 th Street August 2, 2013 7. OTHER PERMITS Other permits required for this project include: • Administrative Site Plan Review • Washington State Environmental Policy Act (SEPA) Review 8. CSWPPP ANALYSIS AND DESIGN This section summarizes the construction stormwater pollution prevention plan (CSWPPP) analysis and design. The two components ofthe CSWPPP are the erosion and sediment control (ESC) and the stormwater pollution prevention and spill (SWPPS) plans. Both the ESC Plan and SWPPS serve as guides as the contractor is required to design a working CS WPPP for the site. The analysis and design of these plans are discussed in the following sections. 8.1 ESC Plan Analysis and Design The ESC design follows the guidelines provided in Appendix D of The Manual and is intended to satisfy Core Requirement #5 Erosion and Sediment Control. A stabilized entrance will be maintained throughout construction ofthe site improvements. Silt fence will be installed downslope of the improvements. Chain link fencing will be used to protect all trees that are to be preserved onsite. Street cleaning on SW 16th Street will occur daily or as needed to remove any sediment tracked from the site. Site surface drainage will be maintained to prevent any ponding and inlet protection will be provided at all existing and proposed catch basins that may receive runoff during construction. All disturbed areas that will not be paved will be stabilized by planting and mulching immediately after construction. The proposed ESC measures are shown on the Temporary Erosion and Sediment Control Plan in APPENDIX D. An ESC supervisor will be designated for the project and must be a Certified Professional in Erosion and Sediment Control or a Certified Erosion and Sediment Control Lead, as recognized by King County. The ESC supervisor will be responsible for the performance, maintenance, and review of all ESC measures, as well as the compliance with all permit conditions relating to ESC as described in The Manual. Davido Consl/lting Group, Inc. TIR_Shuttle Express.doc Page 14 Technical Information Report Shuttle Express Parking Lot-800 SW 16th Street August 2, 2013 TABLE 3 Proposed ESC Measures and Construction Sequencing (all ESC Measnres Shall Comply with the KCSWDM Appendix D) ESC Measure Comment I IdentifY Project Limits Mark by tencing or other means to contain the grubbing and grading activities. This includes installing temporary chain link fencing around trees that are to remain. 2 Install temporary silt fence Install fence down-slope of the improvements. 3 Construct stabilized Use existing gravel driveway for construction construction entrance entrance or construct new temporary entrance if necessary (i.e., sediment tracked onto road). 4 Install inlet protection as Ensure that sediment cannot enter the existing or required, based on proposed drainage. construction sequencing 5 Maintain ESC measures Relocate or install new measures if necessary to meet King County ESC standards (KCSWDM Appendix D). 6 Street Cleaning Provide for periodic street cleaning to remove and sediment that may have been tracked out. Sediment should be removed by shoveling or sweeping and carefully removed to a suitable disposal area where it will not be re-eroded. 7 Inspect downstream VerifY that all drainage system components free drainage system, clean if of sediment. If sediment present then repair or necessary during implement additional ESC measures. construction. 8 Surfacing and Sod/Seed Construct pavement, sidewalks, etc. as soon as Exposed Areas possible. Cleared areas will be sod/seeded as soon as possible after grading completed. 9 Remove ESC measures After hard surfaces are constructed and cleared after site stabil ized and areas are stabilized, remove ESC measures and clean system. clean any sediment/debris in drainage system. 8.2 Stormwater Pollution Prevention and Spill Plan Design The SWPPS plan is intended to prevent pollutants from coming into contact with stormwater runoff, surface waters, or groundwater, during construction. Vehicles, construction equipment, materials, chemical storage, and sediment from clearing and grading all have the potential to pollute stormwater during construction. The following BMPs are required during the construction of this project: • Maintain good housekeeping. • Designate vehicle, equipment, and chemical storage areas. Davida Consulting Group, Inc. TIR_Shuttle Express.doc Page 15 Technical Information Report Shuttle Express Parking Lot-800 SW 16th Street August 2, 2013 • Inspect vehicle, equipment, and petroleum product storage and dispensing areas regularly to detect any leaks or spills. • Store and contain liquid materials in such a manner that if the tank leaks, the contents will not discharge into the storm drainage system, surface waters, or groundwater. • Provide maintenance and cleaning of the storm drainage system regularly by removing sediment and debris. • All spills will be cleaned up immediately and disposed correctly. Do not hose down spill areas to a storm drainage system. • All toxic materials will be stored under cover when not in use or during a rain event. • Use storm drain covers or other similarly effective runoff control measures to prevent sediment and other pollutants from entering catch basins. All ESC and SWPPS BMPs will be inspected routinely by the ESC supervisor. All ESC measures will be removed, the site stabilized, and the drainage system cleaned once construction is completed. 9. BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANTS The bond quantities, facility summaries, and declaration of covenants/agreements are addressed in the following sections. • Bond Quantities -The bond quantities for the project are calculated in King County's Bond Quantity Worksheet attached in APPENDIX F. • Facility Summaries -The stormwater facilities are summarized in the Stormwater Facility Summary Sheet attached in APPENDIX G. • Declaration of Covenants I Agreements - A declaration of covenant for privately maintained flow control and WQ facilities will be provided under separate cover at a later time. 10. OPERATIONS AND MAINTENANCE MANUAL All stormwater facilities should be maintained in accordance with Appendix A ofthe KCSWDM, which is attached in APPENDIX E. Maintenance ofthe porous asphalt is crucial in maintaining an infiltrating surface course. Davido Consulting Group. Inc TIR_Shuttle Express_doc Page 16 Technical Information Report Shuttle Express Parking Lot-800 SW \6'h Street August 2, 2013 APPENDIX A TlR_Shuttle Express.doc Figure 1 -Technical Information Report (TIR) Worksheet KI:-:G COCNTY, W ASHINGTOl';, SURF ACE WATER DESIGN :vIANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET I Part 1 PROJECT OWNER AND i PROJECT ENGINEER ! Project Owner Devin Sherrell . Phone 425-981-7069 Address 800 SW 16th Street Renton, WA 98057 Project Engineer Erik Davida, P,E. Company Davida Consulting Group,Inc. Phone 206-523-0024 Part 3 TYPE OF PERMIT APPLICATION I 0 Landuse Services Subdivison I Short Subd. I UPD I 0 Building Services M/F I Commerical I SFR [J Clearing and Grading ~ Right-ol-Way Use o Other PartS PLAN AND REPORT INFORMATION Technical Information Report Type 01 Drainage Review W Targeted (circle): Large Site Date (include revision 7/01/2013 dates): Date of Final: TBD Part 6 ADJUSTMENT APPROVALS I Part 2 PROJECT LOCATION AND DESCRIPTION Project Name Shuttle Express Parking Lot ODES Permit # _________ _ Location Township -=2.::3.:cN ___ _ Range __ 4_E ____ _ Section __ 2::..::.4 ___ _ Site Address 800 SW 16th Street Renton, WA 98057 Part 4 OTHER REVIEWS AND PERMITS o DFWHPA o COE404 o DOE Dam Safety o FEMA Floodplain o COE Wetlands o Other o Shoreline Management o Stnuctural RockeryNaultl __ o ESA Section 7 Site Improvement Plan (Engr. Plans) Type (circle one): @ Modified I Small Site Date (include revision 7/01/2013 dates): Date 01 Final: TBD Type (circle one): Standard I Complex I Preapplication I Experimental I Blanket Description: (include conditions in TIR Section 2) N/A Date 01 Approval: 2009 Surface Water Design Manual 1/9/2009 I KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 7 MONITORING REQUIREMENTS I Monitoring Required: ves@ Describe: Start Date: Completion Date: Part 8 SITE COMMUNITY AND DRAINAGE s.+.sIN Community Plan: _____________ _ Special District Overlays: _______________________ _ Drainage8asin: Lower Green River Subwatershed Stormwater Requirements: Level 1 Flow Control and Basic Water Quality Part 9 ONSITE AND ADJACENT SENSITIVE ~EAS DRiver/Stream _________ _ o Steep Slope ________ _ o lake o Erosion Hazard _______ _ o Wetlands __________ _ o landslide Hazard _______ _ o Closed Depression _______ _ o Coal Mine Hazard _______ _ o Floodplain __________ _ o Seismic Hazard _______ _ o Other __________ _ o Habitat Protection ______ _ 0 ________ _ Part 10 SOILS 1 Soil Type Slopes Erosion Potential Undocumented Fill 0-10% Low o High Groundwater Table (within 5 feet) o Sole Source Aqu ifer o Other o Seeps/Springs o Additional Sheets Attached 2009 Surface Water Design Manual 2 119/2009 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 11 DRAINAGE DESIGN LIMITATIONS REFERENCE o Core 2 -Offsite Analysis o Sensitive/Critical Areas IZI SEPA o Other LIMITATION / SITE CONSTRAINT 1 0 ----------- I 0 Additional Sheets Attached Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Areal Threshold Discharge Area: (name or description) Project Site Core Requirements (all 8 apply) Discharge at Natural Location Number of Natural Discharqe Locations: 1 Offsite Analysis Level: 1 / 2 I 3 dated: Exempt by full-infiltration Flow Control Level: it~ 2 I 3 or Exemption Number (incL facility summary sheet) Small Site MPs Conveyance System Spill containment located at: NA Erosion and Sediment Control ESC Site Supervisor: TB D Contact Phone: After Hours Phone: Maintenance and Operation Responsibility: ~ I Public If Private, Maintenance Loq Required: (i;S)1 No Financial Guarantees and Provided: ( Yes) No Liability Water Quality Type: <-Basic;)/ Sens, Lake I Enhanced Basicm I Bog (include facility summary sheet) or Exemptionl\Jo. Landscape ManaQement Plan: t<fe'S) I No Special Requirements (as applicable) Area Specific Drainage Type: CDA I SDO I MDP I BP I LMP I Shared Fac. ~ Requirements Name: Floodplain/Floodway Delineation Type: Major I Minor I Exemption /@~V 100-year Base Flood Elevation (or range): Datum: Flood Protection Facilities Describe: Source Control Describe landuse: (comm.lindustriallanduse) Describe any structural controls: 2009 Surface Water Design Manual 11912009 3 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Oil Control High-use Site: Yes /~ Treatment BMP: Maintenance Agreement: Yes /9 with whom? Other Drainage Structures Describe: Part 13 EROSION AND SEDIMENT CONTRO REQUIREMENTS MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION AFTER CONSTRUCTION ~ Clearing Limits IZI Stabilize Exposed Surfaces IZI Cover Measures IZI Remove and Restore Temporary ESC Facilities IZI Perimeter Protection ~ Clean and Remove All Silt and Debris, Ensure ~ Traffic Area Stabilization Operation of Permanent Facilities ~ Sediment Retention IZI Flag Limits of SAO and open space ~ Surface Water Collection preservation areas o Other ~ Dewatering Control IZI Dust Control W Flow Control Part 14 STORMWA TER FACILITY DESCRIPTI )NS (Note: Include FaciHty Summary and Sketch) Flow Control Type/Description Water Quality Type/Description o Detention W Biofiltration 1 ' thick sand treatment liner W Infiltration Permeable o Wetpool below infiltration Pavement facility o Regional Facility o Media Filtration o Shared Facility o Oil Control o Flow Control o Spill Control BMPs ~ Flow Control BMPs o Other o Other 2009 Surface Water Design Manual 1/9/2009 4 · .. KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET ! Part 15 EASEMENTSITRACTS Part 16 STRUCTURAL ANALYSIS o Drainage Easement o Cast in Place Vault o Covenant o Retaining Wall o Native Growth Protection Covenant o Rockery > 4' High o Tract o Structural on Steep Slope o Other o Other Part 17 SIGNATURE OF PROFESSIONAL ENGINEER I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were incorporated into this worksheet and the attached Technical Information Report To the best of my knowledge the information provided here is accurate. SianediDate 2009 Surface Water Design Manual 1/9/2009 5 • Technical Information Report Shuttle Express Parking Lot-800 SW 16 1h Street Davida Consulting Group, Inc. TIR_Shuttle Express.doc APPENDIXB Geotechnical Report August 2, 2013 • Main Office 17311 -135 1h Aye NE, A-500 Woodinville, WA 98072 (425) 486-1669 . FAX (425) 481-2510 June 21, 2013 Peer Frank, LLC c/o Devin Sherrell 800 SW 16'h Street Renton, Washington 98057 NELSON GEOTECHNICAL ASSOCIATES, INC. GEOTECHNICAL ENGINEERS 8: GEOLOGISTS Engineering-Geology Branch 5526 Industry Lane, #2 East Wenatchee, WA 98802 (509) 665-76% . fAX (509) 665-769' Geotechnical Engineering Evaluation Shuttle Express Parking Lot aud Inmtration 800 SW 16'h Street Renton, Washington NGA File No. 875613 Dear Mr. Sherrell: This letter documents our explorations and provides our opinions and recommendations for the proposed parking lot construction and stormwater infiltration at the existing Shuttle Express office building located at 800 SW 16th Street in Renton, Washington, as shown on the vicinity map in Figure 1. INTRODUCTION The planned improvements will consist of constructing an approximately 16,000 square foot parking lot within the southern portion of the property along SW 16th Street, along with associated underground utilities, and a stormwater management system on the property. The site is currently occupied by a multi- level office building within the central portion of the property with associated parking areas on the north, east and west sides of the building. The existing and proposed site layouts are shown on the Schematic Site Plan in Figure 2. For our use in preparing this letter, you have provided us with an aerial image of the property showing the proposed location of the parking lot area. Stormwater Infiltration Letter Shuttle Express Parking Lot and Infiltration Renton, Washington SCOPE June 21, 2013 NGA File No. 875613 Page 2 The purpose of this study is to explore and characterize the subsurface conditions in specific areas of the site and to provide opinions and recommendations for the proposed parking lot and the potential for stormwater infiltration. Specifically, our scope of services includes the following: I. Review existing soils and geologic maps of the area. 2. Explore the site subsurface soil and groundwater conditions with backhoe-excavated test pits. Backhoe to be subcontracted by NGA. 3. Perform on-site infiltration testing. 4. Perform laboratory analysis on representative soil samples, as needed. 5. Provide recommendations for stormwater infiltration per 2009 King County Surface Water Design Manual and City of Renton Ammendments. 6. Provide recommendations for pavement sub grade preparation and pavement sections. 7. Provide recommendations for site drainage and erosion control. 8. Provide recommendations for infiltration system installation. 9. Document the results of our explorations, fIndings, conclusions, and recommendations in a written geotechnical engineering report. SITE CONDITIONS Surface Conditions The site is a relatively level, rectangular shaped lot covering approximately 3.25 acres. The site is bounded to the north by Interstate 405, to the east and west by commercial properties and to the south by SW 16th Street. An existing multi-level office building is located within the central portion of the site with asphalt parking and driveway areas along the north, east and west sides of the building. The proposed parking lot expansion is to be located within a grass lawn area to the south of the office building along SW 16th Street. We did not observe surface water on the site during our visit on June 3, 2013. Subsurface Conditions Geology: The site is mapped on the Geologic Map of the Renton Quadrangle, King County. Washington, by D.R. Mullineaux (1965). The site is mapped as Alluvium (Qaw). The alluvium deposits are described as sand silt and clay deposits. Our explorations generally encountered undocumented fill soils underlain by silty sand to silt deposits generally consistent with the description of alluvium at depth. NELSON GEOTECHNICAL ASSOCIATES, INC. • Storrnwatcr Infiltration Letter Shuttle Express Parking Lot and Infiltration Renton, Washington June 21, 2013 NGA File No, 875613 Page 3 Explorations: The subsurface conditions within the site were explored on June 3, 2013 by excavating four test pits with a backhoe, The approximate locations of our explorations are shown on the Schematic Site Plan in Figure 2. A geologist from Nelson Geotechnical Associates, Inc. (NGA) was present during the explorations; collected samples of the soils encountered, and maintained logs of the explorations, The soils were visually classified in general accordance with the Unified Soil Classification System, presented as Figure 3, The logs of the explorations are presented as Figure 4, Each of the test pits exposed a surficial layer of topsoil and grass to a depth of 0.2 feet below the existing ground surface. Underlying the topsoil and grass in al\ of our test pits we encountered approximately 3,8 to 4.8 feet of medium dense to dense, brown gray fine sand with silt, trace gravel and varying amounts of organics which we interpreted as undocumented fill. Below the fill in all of our test pits, we encountered looselsoft, iron-oxide stained, brown gray to gray silty sand and sandy silt with varying amounts of gravel and organics underlain by soft to very soft, blue gray to gray sand, silt with abundant orgaincs that we interpreted as native alluvium soils mapped for the area. All of our test pits were terminated within the native alluvium soils at depths in the range of8.5 to 12.0 feet below the existing ground surface. Hydrologic Conditions Groundwater seepage was observed at approximately 11.0 and 7.5 feet below the ground surface in Test Pit I and 3, respectively, In addition, zones of iron oxide staining and saturated soil conditions were encountered within all of the test pits between approximately 4.0 to 12.0 feet. In our opinion, the groundwater seepage, iron oxide staining and saturated soil conditions are indicative of the high groundwater table associated with the nearby river. SEISMIC HAZARD The site is shown on the Liquefaction Susceptibility of the Renton Quadrangle, Washington by Stephen P. Palmer, Henry W. Schasse, Dave K. Norman, et. al. (WSDNR, 1994) to have a high liquefaction potential. Liquefaction is the temporary loss of the shear strength of a loose soil deposit (usually submerged clean fine to medium sand) due to a rise in pore water pressures during a seismic event. When subjected to prolonged cyclic dynamic loads, the pore pressures within a saturated sand deposit increase, approaching the total overburden pressure. At that time, a "quick" condition develops causing the soil to temporarily lose its load carrying ability. Depending on the depth to the liquefiable soils and actual loads, surface settlements can result from liquefaction. NELSON GEOTECHNICAL ASSOCIA TES, INC, Stonnwater Infiltration Letter Shuttle Express Parking Lot and Infiltration Renton, Washington June 21, 2013 NGA File No. 875613 Page 4 The majority of the site soils at depth within our explorations consisted of low permeability silts and silty sand. We did not encounter saturated clean sand layers within our explorations. However, clean sand layers under groundwater table may exist at depth underlying the site. Based on the soils encountered within our explorations, we expect the liquefaction potential for the upper site soils to be low. However, there may be some potential of liquefaction of soil layers at depth below the site, but in our opinion we would anticipate the impact to the site would be minimal. ON-SITE INFILTRATION TESTING We conducted two on-site infiltration tests in the proposed parking lot area. The infiltration tests were performed within the upper granular fill and underlying native silty sand soils within the parking lot area. For the infiltration tests, we installed a six-inch diameter vertical tube into the native silty sand soils in Test Pit 2 at a depth of 5.0 feet below the adjacent ground surface and in the upper granular fill soils in Test Pit 4 at a depth of approximately 4.0 feet below the adjacent ground surface. Approximately two inches of pea gravel was placed over the soil in the bottom of the tuhe to limit disturbance of the soil when water was added to the apparatus. We filled the tube with water and allowed the water to pre-soak the underlying soils before the actual infiltration testing. After the presoak, we conducted timed infiltration tests. The infiltration test results are shown below in Table 1. We have not applied a factor of safety to the in-place infiltration test results shown in the table. Table 1. Field Results -In-Place Infiltration Test Results Location Approximate depth Duration of Test Head Loss Measured InfIltration [ft.1 Imin.1 lin.) Rate lin/hrl TP-2 5.0 52 6.0 6.92 TP-4 4.0 26 6.0 13.84 CONCLUSIONS AND RECOMMENDATIONS As stated in the 2009 King County Surface Water Design Manual, a minimum requirement of three feet of permeable soil below the bottom of the infiltration facility, and at least three feet of separation from the bottom of the infiltration facility and the maximum wet-season water table needs to exist. In our opinion, based on the soil and groundwater conditions encountered in our test pits, the site conditions do not meet these minimum requirements for infiltration. NELSON GEOTECHNICAL ASSOCIA TES, INC. , · . Storm water Infiltration Letter Shuttle Express Parking Lot and Infiltration Renton, Washington June 21, 2013 NGA File No. 875613 Page 5 It is our opinion that the site subsurface soils are poorly suited for traditional stormwater infiltration trenches. The subsurface soils generally have a hlgh silt content and indications of shallow groundwater within these soils were observed in all of our explorations. It is also our opinion that the use of pervious pavement surfacing to allow runoff from the parking lot to infiltrate into the granular fill layer found withln the site is feasible. Specific recommendations for pervious pavement design have been provided in the Pervious Pavement Design subsection of this letter. Pervious pavement requires on-going maintenance in order to prolong the life span of the pavement. Specific recommendations for maximizing the life span of the proposed pervious pavement are included in the Pavement Maintenance subsection of this letter. We should emphasize that on-going maintenance of the pavement is essential for the long-term success of this approach. All recommendations for pavement subgrade preparation and maintenance as presented in this letter should be followed for the parking lot. We are providing a preliminary pavement design; however, this design should be verified by the civil engineer, based on actual anticipated loads and expected performance and life span of the pavement, and should also be checked against the recommendations of the pavement supplier. Pervious Pavement Design We recommend that the pervious pavement section for the parking lot be a minimum of 6 inches thick and underlain by a minimum of 12 inches of clean crushed rock. This pavement section is preliminary and assumes only light traffic would be imposed on the pavement. Permanent design should be the subject to specific analysis prepared by the civil or traffic engineer and approval by the supplier. Based on the low permeability soils encountered throughout the site at depth, we recommend that the pervious pavement section be underlain by a minimum of 12 inches of314-inch clean crushed gravel with a minimum void ratio of 15 to 20 percent. The gravel should contain no more than 3 percent fines by weight in order to readily infiltrate into the underlying soils. The gravel layer should help facilitate infiltration, but will also aid in providing storage for infiltrating water. This layer should only be lightly compacted. The subgrade below the crushed rock should be stripped of grass and topsoil material to expose the granular fill soils prior to placing the crushed rock. These soils should generally be encountered approximately one foot below the existing ground surface. The subgrade below the gravel layer should be scarified to a depth of six inches and graded leveL The exposed subgrade should not be heavily compacted or contaminated with silt, as these conditions may reduce the infiltration capability of NELSON GEOTECHNICAL ASSOCIA TES, INC. Storm water Infiltration Letter Shuttle Express Parking Lot and Infiltration Renton, Washington June 21,2013 NGAFile No. 875613 Page 6 this material. Also, construction traffic on the exposed subgrade should be avoided. We should be retained to observe subgrade preparation prior to placing the crushed rock layer. Based on our observations and on-site infiltration testing along with the varying nature of the underlying soils throughout the site, we recommend that a design infiltration rate of 0.5 inches per hour be used for the granular fill material encountered near the ground surface. Additional recommendations and infonnation regarding pervious pavements are discussed on Pages 97 through III in the Low Impact Design Technical Gnidance Manual for Pnget Sound, (Pnget Sound Action Team & Washington State University, May 2005). The existing underlying fill and crushed rock surface should be proof-rolled with a heavy, rubber-tired piece of equipment, to identify soft or yielding areas that require repair, however, the clean gravel layer should only be lightly compacted. We should be retained to observe the proof-rolling, as well as the placement of the gravel layer, prior to placement of pervious pavement. After installation, pervious pavements should be thoroughly swept and pressure-washed periodically to minimize siltation potential as discussed in the following section. Pavement Maintenance Typical methods for maintaining paved parking areas should be applied to pervious pavement. These methods include power sweeping, blowing, vacuuming, and high-pressure washing. Keeping debris from accumulating on top of and within the pervious pavement is important to maintaining the design infiltration capacity of the system. Should the pavement become partially clogged with debris, penneability could possibly be re-established with the use of vacuuming or pressure washing. Stonnwater from sources outside the pavement should never be directed onto the pervious pavement or subgrade. Fines and organic material from off-site sources could potentially promote clogging of the pavement section. Following the recommendations provided in this letter should help reduce the migration of silt and debris into the pavement section. USE OF THIS LETTER This letter was prepared for Peer Frank, LLC and their agents, for their use in planning and budgeting the above-referenced project only. Our services included an evaluation of the infiltration capability of the site soils at specific locations, and should not be considered as an in-depth geotechnical study. This letter may be used for bidding and estimating purposes, but our letter, conclusions, and interpretations should NELSON GEOTECHNICAL ASSOCIATES, INC. • • ,,-.' Stomlwater Infiltration Letter Shuttle Express Parking Lot and lnfiltration Renton, Washington not be construed as a warranty of the subsurface conditions. June 21, 2013 NGA File No. 875613 Page 7 The suhsurface conditions between explorations may vary. A contingency for changed conditions should be incorporated into the project plans. Within the limitations of scope, schedule, and budget, our services have been performed in accordance with generally accepted geotechnical engineering practices in effect in this area at the time this letter was prepared. No other warranty, expressed or implied. is made. Our observations, findings, and opinions are a means to identify and reduce the inherent risks to the owner. 0-0-0 NELSON GEOTECHNICAL ASSOCIA TES, INC. Stormwater Infiltration Letter Shuttle Express Parking Lot and Infiltration Renton, Washington June 21. 2013 NGA File No. 875613 Page 8 We appreciate the opportunity to provide service to you on this project. If you have any questions or require further information, please call. Sincerely, NELSON GEOTECHNICAL ASSOCIATES, INC. LEE S. BELLAH Lee S. Bellah, LG Project Geologist Khaled M. Shawish, PE Principal LSB:KMS:kmn Four Figures Attached Three Copies Submitted NELSON GEOTECHNICAL ASSOCIA TES, INC. ., , , . VICINITY MAP RJpoIIlJIJfI fo~st Oakesdale A ~ "':I" "'''es~ '\\; Tukwila EJ Amuak la sTallone 'thbound) 'a~..; II' I-'p -lo~ : _k\'llh, WA Project Nu m ber :1 5W rth 51 875613 Shuttle Express Parking Lot 1--=':"':"::"':"::'--1 Vicinity Map Not to Scale SW 7Th 51 " - ~ ~ SW l&lh St ~ SWZ\slSI SW 23rd $1 SW 23rlj 51 Renton, WA ~ NELSON GEOTECHNICAL. ", NG~ ASSOCIATES, INC. GI!OTECM NICAL ENGINEERS &: GEOLOGISTS I~ p S Gladl 'o'l'~ II API}!e>hl' Nl'tCj:-It,o.lrc ~ S I!:th SI S l~lh No. Date Revision N " CX> <5' "-l c (]I <n '" ~ N "" 00 ::r ooi§: " -::rCD CD m 3 x nJ'O =t{iJ " '" 00'" :::+"'0 CD nJ "O~ iil 5' ::leo r- 0 ~ M Ui ";Jt il" •• § ~ ~ I Z '" '" z »1"" a III III Z .,0 N OZ N ~Gl • r ~ )0 '" I I .. ~ ~ l G') UI [1'1 III ~ :. n i~ ~ z:r _~ a C'l Z §ati: -• -F w n d.... > w I"" ]] l'l e " j s _.- ~ TP-1 ~ "' '" + ~ ~ r .- · I · I · I · I • I · L._. LEGEND Property line Number and approximate location of test pit Schematic Site Plan A "_._~, ••• r-_ • .• "''''' ...... '''''''1 ... ~, •• :uc: 1 inch;: 100 Feet ,_ .. _. SW 16th Street .-1 Approximate location of proposed new parking lot N , , , UNIFIED SOIL CLASSIFICATION SYSTEM GROUP MAJOR DIVISIONS SYMBOL GROUP NAME CLEAN GW WELL-GRADED. FINE TO COARSE GRAVEL COARSE-GRAVEL GRAVEL GP POORLY-GRADED GRAVEL GRAINED MORE THAN 50 %, GRAVEL OF COARSE FRACTION GM SILTY GRAVEL RETAINED ON SOILS NO.4 SIEVE WITH FINES GC CLAYEY GRAVEL SAND CLEAN SW WELL-GRADED SAND. FINE TO COARSE SAND SAND SP POORLY GRADED SAND MORE THAN 50 % RETAINED ON MORE THAN 50 % NO. 200 SIEVE OF COARSE FRACTION SAND SM SILTY SAND PASSES NO.4 SIEVE WITH FINES SC CLAYEY SAND FINE -SILT AND CLAY ML SILT INORGANIC GRAINED LIQUID LIMIT CL CLAY LESS THAN 50 % SOILS ORGANIC OL ORGANIC SILT. ORGANIC CLAY SILT AND CLAY MH SILT OF HIGH PLASTICITY. ELASTIC SILT MORE THAN 50 % INORGANIC PASSES LIQUID LIMIT CH CLAY OF HIGH PLASTICITY. FLAT CLAY NO. 200 SIEVE 50 % OR MORE ORGANIC OH ORGANIC CLAY. ORGANIC SILT H IGHL Y ORGANIC SOILS PT PEAT NOTES: 1) Field classification is based on visual SOIL MOISTURE MODIFIERS: examination of soil in general ~ accordance with ASTM 0 2488·93. Dry -Absence of moisture, dusty, dry to the touch 2} Soil dasslfication using laboratory tests :3 Moist -Damp, but no visible water. ~ is based on ASTM D 2488-93. ~ 3} Descriptions of soil density or Wet -Visible free water or saturated. ~ usually soil is obtained from consistency are based on below water table ! Interpretation of blowoounl data, visual appearance of soils, andJor test data. ~ Project Number ~ELSON GEOTECHNICAL No. Date Revision By CK ::l 875613 Shuttle Express Parking Lot NGA ASSOCIATES, INC. , 6120115 Origlna! LSB KMS ~ ~ Soil Classification Chart GEOTECHNICAL ENGINII!:E:RS 8: GE.OLOGISTS 0 ~ • Figure 3 ITJll_135<h~ .. IE. ~·soo ~Cou.ty142!1IJl7_t_ ~ ............... ,WA98071 W"-':;~,",,(5OQ1 ffl4-l7511 ,42li148c.-t_,~ .... 4II"2liI~ _~_com DEPTH (FEET) TEST PIT ONE 0.0 -0.2 0.2 -4.0 4.0-7.0 7.0 -12.0 TEST PIT TWO 0.0-0.2 0.2-5.0 5.0 -7.0 7.0-8.5 TEST PIT THREE 0.0 -0.2 0.2-5.0 5.0 -7.5 7.5-11.5 TEST PIT FOUR 0.0 -0.2 0.2 -5.0 5.0-11.5 LSB:KMS usc SM ML SM ML LOG OF EXPLORATION SOIL DESCRIPTION TOPSOILJGRASS BROWN-GRAY. FINE TO SAND WITH SILT AND TRACE GRAVEL (MEDIUM DENSE TO DENSE, MOIST) (FILL) GRAY IRON-OXIDE STAINED. SILTY FINE TO MEDIUM SAND WITH TRACE GRAVEL AND ORGANICS (LOOSE. MOIST TO WET) GRAY SANDY SILT WITH ABUNDANT ORGANICS (LOGS)(SOFT TO STIFF, WET TO SATURATED) SAMPLES WERE COLLECTED AT 3.0. 4.5. 7.0. AND 11.0 FEET LIGHT GROUNDWATER SEEPAGE WAS ENCOUNTERED AT 11.0 FEET SLIGHT TEST PIT CAVING WAS ENCOUNTERED BETWEEN 6.0 AND 11.0 FEET TEST PIT WAS COMPLETED AT 12.0 FEET ON 613/13 TOPSOILJGRASS BROWN-GRAY. FINE TO SAND WITH SILT AND TRACE GRAVEL (MEDIUM DENSE TO DENSE. MOIST) (FILL) BROWN-GRAY IRON-OXIDE STAINED. SILTY FINE TO MEDIUM SAND WITH TRACE GRAVEL AND ORGANICS (LOOSE, WET TO SATURATED) BROWN GRAY SANDY SILT WITH ORGANICS (SOFT. WET TO SATURATED) SAMPLES WERE COLLECTED AT 3.0. 6.5. AND 7.0 FEET GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED TEST PIT CAVING WAS NOT ENCOUNTERED TEST PIT WAS COMPLETED AT 8.5 FEET ON 613113 TOPSOlllGRASS BROWN-GRAY. FINE TO SAND WITH SILT AND TRACE GRAVEL (MEDIUM DENSE TO DENSE. MOIST) (FILL) SMlML BLUE GRAY IRON-OXIDE STAINED. INTERBEDDED SILTY FINE TO MEDIUM SAND AND SANDY SILT WITH TRACE ORGANICS (LOOSE/SOFT. WET TO SATURATED) ML BLUE GRAY SANDY SILT WITH ORGANICS (SOFT TO STIFF. SATURATED) SAMPLE WAS COLLECTED AT 3.0 FEET ML LIGHT GROUNDWATER SEEPAGE WAS ENCOUNTERED AT 7.5 FEET SLIGHT TEST PIT CAVING WAS ENCOUNTERED BETWEEN 7.5 AND 11.0 FEET TEST PIT WAS COMPLETED AT 11.5 FEET ON 6/3/13 TOPSOILJGRASS BROWN-GRAY. FINE TO SAND WITH SILT AND TRACE GRAVEL (MEDIUM DENSE TO DENSE. MOIST) (FILL) BLUE GRAY SILT WITH FINE SAND AND ORGANICS (SOFT TO STIFF. WET TO SATURATED) SAMPLES WERE COLLECTED AT 2.5.5.5.7.5.10.0 AND 11.5 FEET GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED TEST PIT CAVING WAS NOT ENCOUNTERED TEST PIT WAS COMPLETED AT 11.5 FEET ON 613/13 NELSON GEOTECHNICAL ASSOCIA TES, INC. FILE NO 875613 FIGURE 4 , , , , Technical Information Report Shuttle Express Parking Lot-800 SW 16th Street Davido Consulting Group, Inc. TIR_Shuttle Express.doc APPENDIXC Site Improvement Plans August 2, 2013 • )~,,, , .. '"[) .,~" """') """(] -._---;;-;:::---- ~ ! ! I , , , ! ! g i ! -iti~; , , ! -I " ! ! ii,il! I i ,I.!!! ~ ~ ~ ~ ~ E ;DD • N'f1d 311S '1M 'NOIN3~ '1$ H.J.9~ MS ooe [01 :)NI>lcNd f.IOIN]1j -SS3~dX] ]lllnH.~." '1M 'NOIN]~ 1S H19L MS 009 :)11 ')IN\i~.:I ~]]d I I I , l "'. ~ 'I 1 :! o u Technical Information Report Shuttle Express Parking Lot-800 SW 16th Street August 2, 2013 APPENDIXD Davido Consulting Group, Inc. TlR_Shuttlc Express,doc Temporary Erosion and Sediment Control Plan i , ! I j I j • --------;:;n::-;;::"---- NY1d :)S31 '1M 'N01,"J]~ 'is Hl9l MS 009 101 ~NI>t;.j"d N01N])j -SS]l:IdX] 3lLn"ff-':r<> •• '1M 'N01N]CI 1S H.19l MS 0013 :)11 '>tNVl:I;j ~]]d N o u Technical Information Report Shuttle Express Parking Lot-800 SW 16'h Street Davida Consulting Group, Inc TIR _Shuttle Express.doc APPENDIXE Operation and Maintenance August 2, 2013 '/ O&M Manual August 2, 2013 Shuttle Express Parking Lot Operation and Maintenance Manual Person or Organization Responsible for Maintenance of the On-Site Storm System: Peer Frank, LLC Devin Sherrell 800 SW 16 th Street Renton, W A 98057 The Location Where the Operation and Maintenance Manual is to be Kept: Shuttle Express Business Office 800 S W 16 th Street Renton, W A 98057 *Note: The manual and maintenance activity log must be made available to the City of Renton for inspection purposes. Description of On-Site Storm System The on-site storm system for the Shuttle Express Parking Lot project consists of a porous asphalt parking lot with underlying rock pocket and engineered soils layer, Type 1 catch basins with spill control elbows, and 8-12" storm pipe connecting the proposed catch basins to the city's storm system in SW 16th Street. Stormwater runoff from the site will infiltrate through the porous asphalt where there will be a 6"rock pocket underneath for storage (although a portion of the parking lot will contain a 12" thick rock pocket for structural stability). The permeable pavement facility is sized to handle all the stormwater from a 1 DO-year storm with a factor of safety greater than 2. Only during extreme events (greater than any event in the available data in KCRTS), a rain on snow event, or ifthe permeable pavement gets clogged and is unable to allow stormwater to infiltrate, will stormwater be leaving the site through an overflow system comprised of four catch basins and a conveyance system that connects to an existing catch basin in the city's system in SW 16 th Street. Eight-inch storm drain pipe will connect all of the proposed onsite catch basins and a 12" storm drain will serve the connection to the city's system in SW 16 th Street. All onsite catch basins will have a downturned 90 degree elbow for oil/water separation/spill control located inside them. The permeable pavement facility, catch basins, and spill control elbows serve as source control of pollution on the project site. In order to control pollutants, proper maintenance and cleaning of debris, sediments, and oil from stormwater collection and conveyance systems is required per the operation and maintenance recommendations found in the 2009 King County Surface Water Design Manual (KCSWDM) and the City of Renton Shuttle Express Parking Lot Dca, Inc. O&M Manual August 2, 2013 Amendments to the KCS WDM. See the attached sheets for operation and maintenance requirements pertaining to the project. Contact Information for Stormwater Facility Installers: Contractor (Installer of On-Site Storrnwater Facilities) Bruno DeSimone Superior Asphalt Maintenance, Inc. P.O. Box 66956 Burien, W A 98166 Phone -206.246.3237 Bruno@SuperiorAsphaltNW.com Civil Engineer (Designer of On-Site Stormwater Facilities) Erik Davido P.E., LEED A.P. Davido Consulting Group, Inc 15029 Bothell Way NE Lake Forest Park, WA 98155 Phone -206.523.0024 erik@dcgengr.com Attachments • Operation and Maintenance Recommendations for Infiltration Facilities from the 2009 KCSWDM • Operation and Maintenance Recommendations for Catch Basins and Manholes from the 2009 KCSWDM • Operation and Maintenance Recommendations for Conveyance Pipes from the 2009 KCSWDM • Operation and Maintenance Recommendations for Grounds (Landscaping) from the 2009 KCSWDM Shuttle Express Parking Lot DCG, Inc. •• APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL. CO:-'VEYA:-'CE. AND WQ FACILITIES NO.2-INFILTRATION FACILITIES --.---- Maintenance Defect or Problem Conditions When Maintenance Is Needed Results Expected When Component Maintenance Is Performed Site Trash and debris Any trash and debris which exceed 1 cubic foot Trash and debris cleared from site. per 1,000 square feet (this is about equal to the amount of trash it would take to fill up one standard size office garbage can). In general, there should be no visual evidence of dumping. Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation constitute a hazard to County personnel or the removed according to applicable public. regulations. No danger of noxious vegetation where County personnel or the public might normally be. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of pollution as oil. gasoline, concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Grasslgroundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a height. height no greater than 6 inches. Infiltration Pond, Top Rodent holes Any evidence of rodent holes iffacility is acting Rodents removed or destroyed and or Side Slopes of as a dam or berm, or any evidence of water dam or berm repaired. Dam, Berm or piping through dam or berm via rodent holes. Embankment Tree growth Tree growth threatens integrity of dams, berms or Trees do not hinder facility slopes, does not allow maintenance access, or performance or maintenance interferes with maintenance activity. If trees are activities. not a threat to dam, berm, or embankment integrity or not interfering with access or maintenance, they do not need to be removed. Erosion Eroded damage over 2 inches deep where cause Slopes stabilized using appropriate of damage is still present or where there is erosion control measures. If erosion potential for continued erosion. Any erosion is occurring on compacted slope, a observed on a compacted slope. licensed civil engineer should be consulted to resolve source of erosion. Settlement Any part of a dam, berm or embankment that has Top or side slope restored to design settled 4 inches lower than the design elevation. dimensions. If settlement is significant. a licensed civil engineer should be consulted to determine the cause of the settlement. Infiltration Pond, Sediment If two inches or more sediment is present or a Facility infiltrates as designed. Tank, Vault, Trench, accumulation percolation test indicates facility is working at or or Small Basin less than 90% of design. Storage Area Infiltration Tank Plugged air vent Any blockage of the vent. Tank or vault freely vents. Structure Tank bent out of Any part of tank/pipe is bent out of shape more Tank repaired or replaced 10 design. shape than 10% of its design shape. Gaps between A gap wider than Yz .. inch at the joint of any tank No water or soil entering tank sections, damaged sections or any evidence of soil particles entering through joints or walls. joints or cracks or the tank at a joint or through a wall. tears in wall Infiltration Vault Damage to wall, Cracks wider than }'2 .. inch, any evidence of soil Vault is sealed and structurally Structure frame, bottom, andlor entering the structure through cracks or qualified sound. top slab inspection personnel determines that the vault is not structurally sound. 2009 Surface Water Design Manual -Appendix A 1/9/2009 A-3 " APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES NO.2-INFILTRATION FACILITIES Maintenance Defect or Problem Conditions When Maintenance Is Needed Results Expected When Component Maintenance Is Performed InlsUOutlet Pipes Sediment Sediment filling 20% or more of the pipe. InleUoutlet pipes clear of sediment. accumulation Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes. pipes (indudes floatables and non-f1oatables). Damaged Cracks wider than Vrinch at the joint of the No cracks more than '/4-inch wide at inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe. at the joints afthe inlet/outlet pipes. Access Manhole Coverllid not in place Coverllid is missing or only partially in place. Manhole access covered. Any open manhole requires immediate maintenance. Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools. not working maintenance person with proper tools. Bolts cannot be seated. Self-locking coverllid does not work. Coverllid difficult to One maintenance person cannot remove Coverllid can be removed and remove coverllid after applying 80 Ibs of lift. reinstalled by one maintenance person. Ladder rungs unsafe Missing rungs, misalignment, rust, or cracks. Ladder meets design standards. Allows maintenance person safe access. Large access Damaged or difficult Large access doors or plates cannot be Replace or repair access door so it doors/plate to open opened/removed using normal equipment. can opened as designed. Gaps, doesn't cover Large access doors not flat and/or access Doors close flat and covers access completely opening not completely covered. opening completely. Ufting Rings missing, Lifting rings not capable of lifting weight of door Lifting rings sufficient to lift or rusted or plate. remove door or plate. Infiltration Pond, Plugged Filter bag more than 1/2 full. Replace filter bag or redesign Tank, Vault, Trench, system. or Small Basin Filter Bags Infiltration Pond, Sediment 6" or more of sediment has accumulated. Pre-settling occurs as designed Tank, Vault, Trench, accumulation or Small Basin Pre- settling Ponds and Vaults Infiltration Pond, Plugged High water level on upstream side of filter Rock filter replaced evaluate need Rock Filter remains for extended period of time or little or no for filter and remove if not water flows through filter during heavy rain necessary. storms. Infiltration Pond Rock missing Only one layer of rock exists above native soil in Spillway restored to design Emergency Overilow area five square feet or larger. or any exposure of standards. Spillway native soil at the top of out flow path of spillway. Rip-rap on inside slopes need not be replaced. Tree growth Tree growth impedes flow or threatens stability of Trees removed. spillway. 1/9/2009 2009 Surface Water Design Manual -Appendix A A-4 APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES NO.5 -CATCH BASINS AND MANHOLES Maintenance Defect or Problem Condition Wnen Maintenance is Needed Results Expected When Component Maintenance is Performed Structure Sediment Sediment exceeds 60% of the depth from the Sump of catch basin contains no bottom of the catch basin to the invert of the sediment. lowest pipe into or out of the catch basin or is within 6 inches of the invert of the lowest pipe into or out of the catch basin. Trash and debris Trash or debris of more than "h: cubic foot which No Trash or debris blocking or is located immediately in front of the catch basin potentially blocking entrance to opening or is blocking capacity of the catch basin catch basin. by more than 10%. Trash or debris in the catch basin that exceeds No trash or debris in the catch basin. 1/3 the depth from the bottom of basin to invert the lowest pipe into or out of the basin. Dead an imals or vegetation that could generate No dead animals or vegetation odors that could cause complaints or dangerous present within catch basin. gases (e.g., methane). Deposits of garbage exceeding 1 cubic foot in No condition present which would volume. attract or support the breeding of insects or rodents. Damage to frame Comer of frame extends more Ihan % inch past Fra me is even with curb. and/or top slab curb face into the street (If applicable). Top slab has holes larger than 2 square inches or Top slab is free of holes and cracks. cracks wider than Y.. inch. Frame not sitting flush on top slab, i.e., Frame is sitting flush on top slab. separation of more than % inch of the frame from the top slab, Cracks in walls or Cracks wider than 1h inch and longer than 3 feel, Catch basin is sealed and bottom any evidence of soil particles entering catch structurally sound. basin through cracks, or maintenance person judges that catch basin is unsound. Cracks wider than ~ inch and longer than 1 foot No cracks more than 1/4 inch wide at at the joint of any inlet/outlet pipe or any evidence the joint of inletioutlet pipe. of soil particles entering catch basin through cracks. Settlement/ Catch basin has settled more than 1 inch or has Basin replaced or repaired to design misalignment rotated more than 2 inches out of alignment. standards. Damaged pipe joints Cracks wider than 'h-inch at the joint of the No cracks more than Y..-inch wide at inlet/outlet pipes or any evidence of soil entering the joint of inletioutlet pipes. the catch basin at the joint of the inlet/outlet pipes. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of pollution as oil. gasoline, concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Inlet/Outlet Pipe Sediment Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment. accumulation Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes. pipes (includes floatables and non-floatables). Damaged Cracks wider than Y:z-inch at the joint of the No cracks more than Y..-inch wide at inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe. at the joints of the inlet/outlet pipes. 2009 Surface Water Design Manual -Appendix A 1/9/2009 A-9 APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES NO.5 -CATCH BASINS AND MANHOLES Maintenance Defect or Problem Condition When Maintenance Is Needed Results Expected When Component Maintenance is Performed Metal Grates Unsafe grate opening Grate with opening wider than 7/g inch. Grate opening meets design (Catch Basins) standards. Trash and debris Trash and debris that is blocking more than 20% Grate free of trash and debris. of grate surface. footnote to guidelines for disposal Damaged or missing Grate missing or broken member(s) of the grate. Grate is in place and meets design Any open structure requires urgent standards. maintenance. Manhole Cover/Lid Cover/Jid not in place Cover/lid is missing or only partially in place. Coverllid protects opening to Any open structure requires urgent structure. maintenance. Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools. Not Working maintenance person with proper tools. Bolts cannot be seated. Self-locking coverllid does not work. Coverllid difficult to One maintenance person cannot remove Coverllid can be removed and Remove cover/lid after applying 80 Ibs. of lift. reinstalled by one maintenance person. 1/9/2009 2009 Surface Water Design Manual -Appendix A A-IO · , APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES NO.6 -CONVEYANCE PIPES AND DITCHES ---- Maintenance Defect or P ... oblem Conditions When Maintenance is Needed Results Expected When Component Maintenance is Performed Pipes Sediment & debris Accumulated sediment or debris that exceeds Water flows freely through pipes. accumulation 2Q% of the diameter of the pipe. Vegetation/roots Vegetation/roots that reduce free movement of Water flows freely through pipes. water through pipes. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of pollution as oil, gasoline, concrete slurries or paint according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Damage to protective Protective coating is damaged; rust or corrosion Pipe repaired or replaced. coating or corrosion is weakening the structural integrity of any part of pipe. Damaged Any dent that decreases the cross section area of Pipe repaired or replaced. pipe by more than 20% or is determined to have weakened structural integrity of the pipe. Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 Trash and debris cleared from square feet of ditch and slopes. ditches. Sediment Accumulated sediment that exceeds 20(1/(1 of the Ditch cleaned/flushed of all sediment accumulation design depth. and debris so that it matches design. Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation constitute a hazard to County personnel or the removed according to applicable public. regulations. No danger of noxious vegetation where County personnel or the public might normally be. Contaminants and ATly evidence of contaminants or pollution such Materials removed and disposed of pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Vegetation Vegetation that reduces free movement of water Water flows freely through ditches. through ditches. Erosion damage to Any erosion observed on a ditch slope. Slopes are not eroding. slopes Rock lining out of One layer or less of rock exists above native soil Replace rocks to design standards. place or missing (If area 5 square feet or more, any exposed native Applicable) soil. 2009 Surface Water Design Manual -Appendix A 119/2009 A-II APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES NO.11-GROUNDS (LANDSCAPING) Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When Component Maintenance is Perfonned Site Trash or titter Any trash and debris which exceed 1 cubic foot Trash and debris cleared from site. per 1,000 square feet (this is about equal to the amount of trash it would take to fill up one standard size office garbage can). In general, there should be no visual evidence of dumping. Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation constitute a hazard to County personnel or the removed according to applicable public. regulations. No danger of noxious vegetation where County personnel or the public might normally be. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of pollution as oil, gasoline, concrete slunies or paint according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Grasslgroundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a height. height no greater than 6 inches. Trees and Shrubs Hazard Any tree or limb of a tree identified as having a No hazard trees in facility. potential to fall and cause property damage or threaten human life. A hazard tree identified by a qualified arborist must be removed as soon as possible. Damaged Limbs or parts of trees or shrubs that are split Of Trees and shrubs with less than 5% broken which affect more than 25% of the total of total foliage with split or broken foliage of the tree or shrub. limbs. Trees or shrubs that have been blown down or No blown down vegetation or knocked over. knocked over vegetation. Trees or shrubs free of injury. Trees or shrubs which are not adequately Tree or shrub in place and supported or are leaning over, causing exposure adequately supported; dead or of the roots. diseased trees removed. 1/912009 2009 Surface Water Design Manual Appendix A A-16 Technical Information Report Shuttle Express Parking Lot-800 SW 16 th Street Davida Consulting Group, Inc. TJR ~Shuttlc Express,doc APPENDIXF Bond Quantity Worksheet August 2, 2013 Site Improvement Bond Quantity Worksheet Web dale: 11/28/2007 ti King County Department of Development lit Environmental Services 900 Oakesdale Avenue Southwest Renton, Washington 98057-5212 206-296-6600 TTY 206-296-7217 Project Name: Sh uttle Exp ress Location: 800 SW 16th Street, Renton, WA Clearing greater than or equal to 5,000 board feet of timber? ______ yes If yes, Forest Practice Permit Number: (RCW 76.09) Page 1 of 9 Bond Quantity Worksheetxlsx X no For alternate formats, call 206-296-6600. Date: 8/2/2013 Project No.: Activity No.: Note: All prices include labor, equipment, materials, overhead and profit. Prices are from RS Means data adjusted for the Seattle area or from local sources if not included in the RS Means database. Unit prices updated: 02112102 Version 04122102 Report Date: 811/2013 Page 2 019 Bond Quantity Worksheetxlsx Site Improvement Bond Quantity Worksheet ESC SUBTOTAL: 30% CONTINGENCY & MOBILIZATION: ESC TOTAL: COLUMN: Web date: 1112812007 $ 4,230.82 $ 1,269.25 $ 5,500.07 A Unit prices updated: 02/12/02 Version: 04122102 Report Date: 8/112013 \. Page30f9 *KCC 27A authorizes only one bond reduction. Bond Quantity Worksheet.xlsx Site Improvement Bond Quantity Worksheet SUBTOTAL 3,747.20 Web date: 11/28/2007 13,825.48 Unit prices updated: 02112102 Version: 4/22/02 Report Date: 81112013 ~ Page 4 019 "'Kec 27 A authorizes only one bond reduction. Bond Quantity Worksheet.xlsx Site Improvement Bond Quantity Worksheet SUBTOTAL 244.58 Web date: 11 f28/2007 12,571.32 Unit prices updated: 02/12/02 Version: 4122102 Report Date: 8/112013 <" Site Improvement Bond Quantity Worksheet Web date: 11/2812007 Page 5 of 9 SUBTOTAL Unit prices updated: 02112102 *KCC 27A authorizes only one bond reduction. Version: 4/22/02 Bond Quantity Worksheet.xlsx Report Date: 8/1/2013 Page 6 of 9 ·KCC 27A authorizes only one bond reduction. Bond Quantity Worksheet.xlsx Site Improvement Bond Quantity Worksheet SUBTOTAL 522.48 Web date: 11/2812007 10,327.19 Unit prices updated: 02/12/02 Version: 4122102 Report Date: 8/112013 ~ Page 7 of 9 "Kec 27A authorizes only one bond reduction. Bond Quantity Worksheet.x1sx Site Improvement Bond Quantity Worksheet SUBTOTAL Web date: 11/2812007 5225.95 Unit prices updated: 021t2102 Version: 4122102 Report Date: 81t 120t 3 • Site Improvement Bond Quantity Worksheet SUBTOTAL SUBTOTAL (SUM ALL PAGES): 30% CONTINGENCY & MOBILIZATION: Page8of9 "Kec 27A authorizes only one bond reduction. Bond Quantity Worksheet.xlsx GRANDTOT AL: COLUMN: 4,514.26 1,354.28 5,868.54 B C Web date: 11/2812007 83,635.00 125,584.94 37,675.48 163,260.42 0 E Unit prices updated: 02112102 Version: 4122102 Report Date: 811/2013 • Site Improvement Bond Quantity Worksheet Web date: 11/28/2007 Original bond computations prepared by: Name: Tim Gabelein, PE Date: 8/2/2013 PE Registration Number: 47652 Tet. #: 206-523-0024 Firm Name: Davida Consulting Group, Inc. Address: 15029 Bothell Way NE Suite 600, Lake Forest Park, WA 98155 Project No: ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS Stabilization/Erosion Sediment Control (ESC) (A) $ Existing Right-of-Way Improvements ~ (B) Future Public Road Improvements & Drainage Facilitie (C) Private Improvements (D) $ $ $ Calculated Quantity Completed (First $7,500 of bond*" shall be cash.) PERFORMANCE BOND" AMOUNT 5,500.1 5,868.5 163,260.4 BOND'AMOUNT REQUIRED AT RECORDING OR TEMPORARY OCCUPANCY""" (E) $ Total Right-of Way andlor Site Restoration Bond"I"" I (A+B) $ 11,368.6 Performance Bond" Amount (A+B+C+D) = TOTAL (T) $ 174,629.0 Minimum bond' amount IS $1000. T xO.30 $ 52,388.7 OR Reduced Performance Bond" Total "'" Maintenance/Defect Bond' Total NAME OF PERSON PREPARING BOND' REDUCTION: * NOTE: The word "bond~ as used in this document means any financial guarantee acceptable to King County. *-NOTE: KeC 27 A authorizes right of way and site restoration bonds to be combined when both are required. (T-E) $ 174,629.0 Use larger of T)(30% or (T -E) Date: PUBLIC ROAD & DRAINAGE MAINTENANCE/DEFECT BOND" (B+C) x 0.25= $ 1,467.1 The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, correcti'lle work, both on-and off-site needs to be included. Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity. **" NOTE: Per KeC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes. SURETY BOND RIDER NOTE: If a bond rider is used, minimum additional performance bond shall be I $ 163,260.4 I(C+D)-E REQUIRED BON~" AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY DOES Page 9 of 9 Check out the DOES Web site at www.kinqcountv.qovlpermits Bond Quantity Worksheet.xlsx Unit prices updated: 02/12102 Version: 4/22/02 Report Date: 9/5/2013 • " Technical Information Report Shuttle Express Parking Lot-800 SW 16 th Street August 2, 2013 APPENDIXG Davida Consulting Group, Inc. TlR_Shuttle Express.doc Storm water Facility Summary Sheet " .. KING COUt.;TY, WASHINGTON, SURFACE WATER DESIG'l MANUAL STORMW A TER FACILITY SUMMARY SHEET DOES Permit Number __ ::-___ -::----:-:- (provide one Stormwater Facility Summary Sheet per Natural Discharge Location) Overview: Project Name ----'S"'h"'u"-t=t"'l-.:oe'---'E=-:x-"p:cr=e-"s-"s'---'P"'a"'r=-:,:k"'i"'nc;:g'---'L"'o"-t"'---_________ Date 8/01/2013 Downstream Drainage Basins Major Basin Name Green/Duwamish River Watershed Immediate Basin Name Lower Green River Subwatershed Flow Control: Flow Control Facility NamelNumber ___ F=-u=l-=l'---.:I:..:n",f=-l=-' =-l-=t-=r-=a"'t=-:i=-o=-n"'---__ _ Facility Location 800 SW 16th Street, Renton, WA Ifnone, Flow control provided in regional/shared facility (give location) __ --,---_--,------:-________ ----,_ No flow control required X Exemption number Full Infiltration General Facility Information: TypelNumber of detention facilities: TypelNumber of infiltration facilities: ___ ponds ponds vaults tanks --- ___ tanks trenches 1 Permeable Pavement Facility Control Structure Location Type of Control Structure ______________ Number of Orifices/Restrictions Size of OrificelRestriction: No, 1 No,2 ______ _ No, 3 ______ _ No, 4 ______ _ Flow Control Performance Standard ______________ _ 2009 Surface Water Design Manual t 119/2009 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL Live Storage Volume ________ Depth _______ Volume Factor of Safety Number of Acres Served _________ _ Number of Lots ________ _ Dam Safety Regulations (Washington State Department of Ecology) Reservoir Volume above natural grade N / A Depth of Reservoir above natural grade N / A Facility Summary Sheet Sketch All detention, infiltration and water quality facilities must include a detailed sketch. (II "x17" reduced size plan sheets may be used) 2009 Surface Water Design Manual 2 ... " 119/2009 • • KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL Water Quality: Type/Number of water quality facilitieslBMPs: ___ biofiltration swale large) (regular/wetl or continuous inflow) large) ___ combined detentionlwetpond (wetpond portion basic or large) ___ combined detentionlwetvault ___ filter strip ___ flow dispersion ___ sand filter (basic or large) ___ sand filter, linear (basic or ___ sand filter vault (basic or sand bed depth ___ (inches) ___ stormwater wetland ___ storm filter ___ wetpond (basic or large) ___ wetvault _1 __ Is facility Lined? above ___ farm management plan ___ landscape management plan _1 __ oil/water separator If so, what marker is used A permeable pavement parking (baffle or coalescing plate) Liner? Sand Liner area lined with a 12" sand layer as specified in the KCSWDM Section 6.2.4.2. catch basin inserts: --- Manufacturer ________________________________________ __ ___ pre-settling pond ___ pre-settling structure: Manufacturer ------------------- ___ high flow bypass structure (e.g., flow-splitter catch basin) source controls --- Design Information Water Quality design flow ________________________ _ Water Quality treated volume (sandfilter) ________________ _ Water Quality storage volume (wetpool) ________________ _ Facility Summary Sheet Sketch 2009 Surface Water Design Manual 3 1/9/2009 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL All detention, infiltration and water quality facilities must include a detailed sketch. (II "x17" reduced size plan sheets may be used) 2009 Surface Water Design Manual 4 · .... 1/9/2009 • Technical Information Report Shuttle Express Parking Lot-800 SW 16'h Street Davido Consulting Group, Inc TIR_Shuttle Express.doc APPENDIX H KCRTS Modeling Results August 2, 2013 KCRTS Modeling -Permeable Pavement Facility Pl'odl.lc( lon of RUllof f TlI . .: Serle::. ProJec;t Loe,atlon Sea-Tae CClJILputlrog Serles bsnAdE"vhr t!;or ':,c~le FQc;(or 1 00 Jata T;n:e Reduced Hour 1 'l T 11fte SO,er les F lIe loading Tllle Sene'S Flle r: "!(C_ST,,lDM"-Kr: DAT':"'·STEI60R rllf o 34 ~' .. T= SCc<hllg Yr 8 ---------- Tot,~l Are,~ :.4 ,~cres Dl:;chal-ge I) 1&1 r:FS at. ~ 01) or. .Jan 9 In Year [; St-Ol'ltlg lUt8 Ser18S Fda DsnAdE",hr tid ll:l,e Se~le!: ConLputed r.CRTc;, COllLlflan,j E:lte~ t1.", AnalYSIs TUL1LS Modul", An~lY~lS T~cls Command _ ... -------------------- Coltpute PEAKS and Flou Frequencles Lo.=odlng Stage·'l'lscli'l.r'3'e Clll:'18 bsnadevhl' tst Flou Frequency AnalySls TUle Serles Flle b::;na.de'Jhr tsf Location Sea-Tae ---I!.nnua~ ~ lO" n:.'HS,,--- F low kate Romk TlIus Cit Peak (CF5) [I 083 2/09'01 00 (I 073 1,1)5,02 10:', 00 101 12,-OB,·02 IB 00 085 8,-26_ 04 00 101 10/28/04 16 00 088 1·-18 '·06 10 (10 124 10,,26,06 o 00 161 1/09 '08 b 00 Peaks -----r lO'" r reqtler,c',r ;mal',r"'ls------- -l-'eak5 kauk keturn Prot (CFS) Pe:nc.d Ct It:.1 1(10 OCt 990 U 124 25 00 %0 o 101 10 00 900 o 101 500 800 o 088 00 667 085 00 500 oe 3 30 231 073 10 091 '" 50 00 no 8 KCRTS ~ Tools _ .,i.;i,;;}~;f:~i,~~_ Compute fEAKS ~nd Flow Frequencies Plot Flow FREQUENCIES Compllte Flow D.URATION l:Ind Exceedence Plot Probl:lbillty EXCEEDENCE CliNeS .c.OMPARE Flow Durl:ltions Extract II !:!YDROGRAPH Plot II Hydro.@RAPH Compllte :Y:OLUME Discharge , BETUAN to Previous Menu ll[--.. _-Compute 11 Row Frequency Curve ~------ , , l!l · .. KCRTS ~ODELING -?ERMEABLE PAVEMEN~ ?ACILITY Retentio~/De~ention Facility Type of Facility: Facility Length: Gravel Infiltration 3556.06 ft Trench Facili ty Width: 2.00 ft Facility Area: Effective Storage Depth: Stage 0 Elevation: Storage Volume: Vertical Permeability: Permeable Surfaces: 7112. 0.50 100.00 1067. 120.00 Bottom sq. ft ft ft cu. ft min/in Riser Head: 0.50 ft Riser Diameter: 12.00 inches Top Notch Weir: None Outflow Rating Curve: None Stage Elevation Storage Discharge (ft) (ft) (cu. ft) (ac-ft) (efs) 0.00 100.00 O. 0.000 0.000 0.03 100.03 64. 0.001 0.000 0.05 100.05 107. 0.002 0.000 0.08 100.08 171. 0.004 0.000 0.10 100.10 213. 0.005 0.000 0.13 100.13 277. 0.006 0.000 0.15 100.15 320. 0.007 0.000 0.18 100.18 384. 0.009 0.000 0.20 100.20 427 . 0.010 0.000 0.23 100.23 491. 0.011 0.000 0.25 100.25 533. 0.012 0.000 0.28 100.28 597. 0.014 0.000 0.30 100.30 640. 0.0;'5 0.000 0.33 100.33 704. 0.016 0.000 0.35 100.35 747. 0.017 0.000 0.38 100.38 811. 0.019 0.000 0.40 100.40 854. 0.020 0.000 0.43 100.43 918. 0.021 0.000 0.45 100.45 960. O. 022 0.000 0.48 100.48 1024. 0.024 0.000 0.50 100.50 1067. 0.024 0.000 0.60 100.60 1067. 0.024 0.308 0.70 100.70 1067. 0.024 0.871 0.80 100.80 1067. 0.024 1.600 0.90 100.90 1067. 0.024 2.390 1. 00 101.00 1067. 0.024 2.670 1.10 101.10 1067. 0.024 2.930 1. 20 101.20 1067. 0.024 3.160 1. 30 101. 30 1067. 0.024 3.380 1. 4 0 101.40 1067. 0.024 3.590 1. 50 101.50 1067. 0.024 3.780 1. 60 101. 60 1067. 0.024 3.970 Percolation (cfs) 0.00 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 .. . 1. 70 101.70 1067. 0.024 4.140 0.08 1. 80 101.80 1067. 0.024 4.310 0.08 1. 90 101.90 1067. 0.024 4.470 0.08 2.00 102.00 1067. 0.024 4.630 0.08 2.10 102.10 1067. 0.024 4.780 0.08 2.20 102.20 1067. 0.024 4.930 0.08 2.30 102.30 1067. 0.024 5.070 0.08 2.40 102.40 1067. 0.024 5.210 0.08 2.50 102.50 1067. 0.024 5.350 0.08 Hyd Inflow Outflow Peak Storage Target Calc Stage Elev (Cu-Ft) (Ac-Ft) 1 0.16 0.00 0.00 0.50 100.50 1067. 0.024 2 0.12 ******* 0.00 0.09 100.09 198. 0.005 3 0.10 ******* 0.00 0.07 100.07 149. 0.003 4 0.10 ******* 0.00 0.05 100.05 113 . 0.003 5 0.09 ******* 0.00 0.03 100.03 72. 0.002 6 0.08 ******* 0.00 0.03 100.03 62. 0.001 7 0.08 ******* 0.00 0.03 100.03 54. 0.001 8 0.07 ******* 0.00 0.02 100.02 45. 0.001 .. " .... Technical Information Report Shuttle Express Parking Lot-800 SW 16th Street Davida Consulting Group. {nc. T1R_Shuttle Express.doc APPENDIX I Conveyance Calculations August 2, 2013 · ... RATIONAL METHOD for Conveyance Facility Sizing (Based on 1998 King County Surface Water Design Manual Section 3.2.1) Project: Description: Design Storm: Shuttle Express Parking Lot Rational method for SD pIpe sizing 100 yr Q-CIA Where Q = peak flow (etS) C = estimated composite runoff coefficient I = peak rainfall intensity (inchesJhour) A = drainage subbasin area (acres) Composite Runoff Coefficient Cc = (C1~A1+C2*A2. __ )lAI Where: Cc = composite runoff coefficient C# = runoff coefficient for Area # A# = area of land cover (acres) At = total area (acres) C. , Cc = QnsitefNew OnsitelNew 0.90 Oescription Impervious Surface Pervious Surface (total C#"A#)1(total area) Time of Concentration Seg.' 1 Description of Flow Path Segment Paved Area (sheet flow) and shallow gutter flow Totals: Unity Peak Intensity Factor if = ar'"Tc"-br where: Tc = time of concentration (minutes) ar and br = coefficients from Table 3.2.1.8 Ares (sf) 7,500 0 Totals: Length (tt) '40 '40 Te= ar= br= 6.30 2.61 0.63 minutes (from table above or 6.3 minimum or 100 max) (from Table 3.2.1.8) ir = 0.82 Peak Rainfall Intensity If= Pr"ir (from Table 3.2.1.8) where· Ir = peak rainfall intensity (inchesfhour) Pr = tolal24-hour preCipitation for design return period (inchesl24 hours) ir = unit peak rainfall intensity factor precipitation (inches) Pr= ir= 3.9 0.82 unit peak intensity factor (from above) Ir = Peak Runoff Rate Q = C~Ir"A 3.19 incheslhour c= Ir= A= 0.90 3.19 0.17 Ce (unilleSS) from above Ir (inchesfhour) from above total area (acres) from above Q= 0.495 cis Pipe Capacity Calculations (Manning's Equation) Full Flow (diD = 0.90) Description 8" for half site ID (inches) 8 Area (sf) 0.34906585 Storm Drain Pipe Sizin9-Rational Method_Bl.xls Calculations Wetted Per. Iftl 2.094395102 Hyd. Radius (ttl 0.16666667 Manning's n 0.011 DCG,/rlc. "'e. (acres) 0.17 0_00 0.17 k' 20 Slope llIIft) 0.0042 Upper Elev 16.75 Velocity (Ws) 2.66 lower Elev 15.5 C 0.90 0.25 Slope (Illftl 0.005 Pipe Capacity (cis) 0.928 A'C 0.15 0.00 0.15 Travel Time (minutes) 2.77 2.8 Req'd Flow (cis) 0.495 8/1f2013 Capacity OK Page1of1