HomeMy WebLinkAboutMiscSTORMWATER TECHNICAL INFORMATION
Renton Aerospace Training Center
Renton, Washington
27,2015
I •
MAGNUSSON
KLEMENCIC
ASSOCIATES
STORMWATER TECHNICAL INFORMATION
Renton Aerospace Training Center
Renton, Washington
July 27, 2015
I •
MAGNUSSON
KLEMENCIC
ASSOCIATES
1301 Fifth Averwe, Svite 3200
Seoule, W[]shi~gton 98101 -2699
r 2062921200 F' 2062921201
MAGNUSSON
KLEMENCIC
SECTION I· PROIECT OVERVIEW
Introduction
Existing Conditions
Proposed Condition
Soils
SECTION II' CONDITIONS AND REQIJIREMENIS SUMMAR.'r' ___ _
Site Conditions/Thresholds
SECTLON III: OFF-SITE ANALYSIS _______________ _
SECTION IV: FLOW CONTROL AND WATER QUALITY FACILITY
ANALYSIS AND DESIGN _
Flow Control
Water Quality Treatment
S££.IlOO V CONVEYANCE SYSTEM ANAlYSIS AND DESIGN
SECTION VI' SPECIAl REPORTS AND STUDIES --------------
SECTION VII OTHER PERMITS
SECTION VIII: CONSTRUCTION STORMWATER POLLUTION
PREVENTION PI AN ANAlYSIS AND DESIGN
Part A -TESC Plan Analysis and Design
Port B -Conceptual SWPPS Plan
SECTION IX: BOND QUANTITIES WORKSHEET, FACILITY SUMMARIES,
AND DE..ClARAIlDH..D'LF--,C-,O,-,-,-V-,--E l'iNnA-'-'NuT ________________ _
SECTION X' OPERATIONS AND MAlNIENANCE MANUAL
REFERENCES
3
5
5
6
7
7
7
9
9
1 0
Stormwater Technical Information
.r?~ik;,1~¥;~·;~,~4.~l.~WJf1'1~Ji!'{~t~±Y<~i,J.,i,nft~~·;·:~'~;~~,)~/&F.;.4~~~,·~~~",t"r'#~~~~~ffI~;~
Renton Aerospace Training Center, Renton, Washington
Table of Contents
•
MAGNUSSON
KLEMENCIC
SECT I O~,--_£R.nJEC,--,-T--,O...LYV-"E-"RJV-,-1 ,,-E W=--_______________ _
INTRODUCTION
This report documents the stormwater and drainage design approach and proposal for the Renton
Aerospace Training Center (RATC) project located in the City of Renton (City), Washington. In
accordance with City permit review requirements, this report documents the project using the City
Amendments to the King County Surface Water DeSign Manual (KCSWDM) requirements for a
Stormwater Technical Information Report (TIR). Figure 1-1 consists of the standard King County TIR
worksheet, which has been completed for the project.
The RATC is located at 300 Rainier Avenue North, at the southwest corner of the Renton Municipal
Airport where NW 3,d Place intersects Rainier Avenue North (Figure 1-2). The project is long and
narrow, bordered at the west by Rainier Avenue North, at the east by West Perimeter Road (a private
road owned by the Renton Municipal Airport), and at the north and south by undeveloped lands.
The proposed RATC project is a 23,000-square-foot (~12,760-square-foot footprint), three-story facility
that will provide training and job simulations for a workforce entering the region's aerospace
manufacturing industry.
The project includes the following tasks:
• Removal of the existing building.
• Construction of a new building, which includes a lobby, administrative area, shop space, design
and fabrication space, classrooms, and a building services core.
• Shoring along the north, south, and west sides of the new building lower floor.
• Partial removal of the existing asphalt parking lot.
• Construction of a new ADA accessible paved entry route.
EXISTING CONDITIONS
The site is located east of Rainier Avenue North, which functions as an interceptor swale for upstream
flows. As a result, there are no off-site flows directed to the site. The westerly portion of the site is
relatively flat and includes an existing building, paved walks and parking lot, and landscaped area
surrounding the building. The easterly portion of the site includes a steep slope that is approximately 30
feet high and connects the elevated westerly portion of the site to West Perimeter Road. The steep slope
was not a natural condition but was constructed by placing filion the westerly portion of the site during
construction of the previous (current) site development. The existing site includes approximately 0.6
acres of impervious area. See Figure 1-3a for existing site basin conditions.
Stormwater runoff from the westerly portion of the site predominantly drains to the south, where it enters
a catch basin that drains to a large public storm drain in West Perimeter Road. Stormwater runoff from
the building is conveyed via a tightlined storm drain to a catch basin in West Perimeter Road that
Stormwater Technical Information
Renton Aerospace Training Center, Renton, Washington
•
MAGNUSSON
KLEMENCIC
,-. ~ ; .
connects to the private storm drain system at the adjacent Renton Municipal Airport, which also
connects to the public storm drain in West Perimeter Road. The public storm drain pipe outfalls in Lake
Washington, appraximately one mile downstream from the site.
There are no natural drainage systems or discharge points within the project area.
PROPOSED CONDITION
The project proposes to keep most of the existing parking lot and to construct a new three-story
building, built into the slope, along with minor asphalt removal and limited site regrading around the
ADA accessible entryway.
Drainage patterns will remain similar to the existing conditions. The revised parking lot will continue to
drain toward the existing catch basin located to the south. Similarly, the proposed building will also
connect to the existing private drainage system in Perimeter Road. In both cases, the existing storm
drain lines will remain in place, and the proposed drainage conveyances will drain to the public storm
drain in West Perimeter Road. See Figure 1-3b for proposed site basin conditions.
No new outfalls will be created for this project; all runoff will be collected and discharged via one of the
two systems described above.
As a result of this project, approximately 3,630 square feet of new and/or replaced pollution-generating
impervious surface (PGIS) will be constructed (Figure 1-3c). The distribution of existing and proposed
impervious and pervious surfaces is (will be) as follows:
Table 1-1: Surface Type Distribution within the Renton Aerospace Training (enter Project limits
Ground Surface Type Existing Sile (acres) Proposed Site (acres)
Impervious Surface (Building/Hardscape) 0.173 0.446
Pervious Surface (Landscaping/Till Pasture) 0.444 0.170
Talal 0.616* 0.616
* Based on square footage, combined area number rounds to 0.616 acres.
SOILS
According to the City Soil Survey Map (Figure 1-4a), the soils at the site appear to be predominantly
Urban Land (Ur). The existing soil conditions were described in the Geotechnical report by Soil &
Environmental Engineers, Inc:
In genera/, the subsoils include loose fill over compelent native soils. Based an the visual classification
and the blow count data, we believe that the fill was placed randomly and withoul compadion. The
native Salis below the fill include alluvial soils over glacially deposited malerials.
Stormwater Technical Information
Renton Aerospace Training Center, Renton, Washington
MAGNUSSON
KLEMENCIC
Considering the blackberry and grasses ground cover of the existing pervious landscaped areas and the
glacial till below the fill layer, the pervious areas have been modeled as "till pasture" for both existing
and proposed conditions.
LIST OF FIGURES
Figure 1-1 : TIR Worksheet
Figure 1-2: Site Location Map
Figure 1-30:
Figure 1-3b:
Existing Site Basin Map
Proposed Site Basin Map
Figure 1-3c: New Plus Replaced Pollution Generating Impervious Surface Map
Figure 1-40: Soil Survey Map
Figure 1-4b: Soil Boring Locations Map
SECTION II· CONDITIONS AND REQUIREMENTS SUMMARY
SITE CONDITIONS[THRESHOLDS
This project is considered a redevelopment project. As identified in Section I, the total project area
encompasses 0.616 acres. The total project area includes bath on-site and off-site (for utility
connections/relocations) areas. Also as identified in Section I, the total new and replaced PGIS is
-3,630 square feet, which is less than the 5,000 square feet threshold. Table 1-1 summarizes the Core
and Special Requirements used in developing the site stormwater management design.
Table 11-1: Summary of Surfale Water Design Criteria Applied to the Renton Aerospale Train Center Project
Requirement/Design Element
Core Requirement (CR) # 1 :
Discharge at the Natural
Location
CR #2: Offsite Analysis
Comment
The project will re-use existing discharge point(s), connecting to
existing downstream conveyance systems. No natural discharge
areas are available for this site. Although a steep slope is
located on the site, stormwater runoff will be directed away from
the slope, prevenf,ng a s"gnificant adverse impact to the slope.
Although the site is at the edge of the "Ten Year Capture Zone"
on the City Groundwater Map (Figure 11-1 a), the existing site has
impervious surface and a steep slope that predominantly
intercepts surface flows and directs the flows to the public storm
drain system.
An off-site Level 1 Analysis is provided in the TIR.
Stormwater Technical Information
Renton Aerospace Training Center, Renton, Washington
•
Requirement/Design Element
CR #3: Flow Control
CR #4: Conveyance
System
CR #5: Temporary Erosion
and Sediment Contral
CR #6: Maintenance and
Operations
CR #7: Financial
Guarantees and liability
CR #8: Water Quality
Special Requirements
MAGNUSSON
KLEMENCIC
~', .~< r,1' •
(omment
The Peak Rate Flow Control Standard is required for this project
(Figure 11-1 b). New flow control facilities are not required far the
project because the development will not generate an increase
of more than 0.10 cis of 1 OO-year peak flow when compared
with existing conditions. Therefore, Exception 1 applies to the
project.
Although the City standard is to convey the 25-year stormwater
runoff while maintaining 6 inches of freeboard in structures, new
storm drain pipes have been designed with capacity to convey
the 1 OO-year stormwater runoff while flowing less than full.
There are no new catch basins except for a tie-in point for the
foundation drainage system. Roof downspouts are tightlined to
the connection point at an existing catch basin.
The project complies with City minimum requirements.
Construction-phase source and spill controls will be addressed in
the Contractor's Stormwater Pollution Prevention Plan (SWPPP)
that is required to be completed prior to the beginning of
construction, as a condition of the Washington State Department
of Ecology Stormwater Management Manual for Western
Washington, Volume II, Construction Stormwater Pollution
Prevention, Publication No. 12-10-030, dated August 2012, and
the Construction Stormwater General Permit (effective Date
January 1,2011).
Guidance and checklists for maintenance of conveyance
components are provided in the TIR.
The Project Owner will provide the necessary bonds and liability
insurance.
The project includes less than 5,000 square feet of new pi us
replaced pollution generating impervious surface (PGIS) and less
than 35,000 square feet 01 new pollution generating pervious
surface (PGPS). Therefore, Surface Area Exemption 1 applies to
this project.
Special Requirement #2, "Flood Hazard Area Delineation," is the
only special requirement that applies to the project. The only
reason this special requirement applies to the project is because
the site is adjacent to a flood hazard area based on a City map
(Figure 11-1 c). However, it is questionable if this special
requirement should apply to the project; based on FEMA maps,
the site is more than 1,400 feet from the floodplain and/or
floodway.
Stormwater Technical Information
Renton Aerospace Training Center, Renton, Washington
LIST OF FIGURES
Figure 11-1 a: Groundwater Map
Figure 11-1 b: Flow Control Application Map
Figure 11-1 c: Flood Hazard Map
SECTION III· OFF-SITE ANALYSIS
MAGNUSSON
KLEMfNCIC
This report includes a Levell Analysis for off·site systems. Basin flows upstream of the site are
intercepted by Rainier Avenue and are directed to a 36·inch-diameter public storm drain in West
Perimeter Road that outfalls in Lake Washington with a submerged outlet approximately one mile
downstream of the site.
There are two points of connedion for site drainage and bath ultimately conned to that same public
storm drain within 1/4 mile dawnstream af the site. Runoff from the upper tier (westerly side) of the site
drains to the south end of the existing parking lot and is collected in a catch basin that connects to the
public storm system in Rainier Avenue. Runoff from the building and easterly portion of the site is
conveyed to a catch basin in West Perimeter Road that is part of a private system owned by the Renton
Municipal Airport. That private system drains to a large detention facility and then connects to the
public storm drain in West Perimeter Road at the detention facility, approximately 880 feet (0.167 miles)
downstream of the site.
It appears the 36-inch public storm drain conveys drainage from an upstream basin that includes
approximately 160 acres prior to the site connection points (basin area upstream of the West Perimeter
Road connection at the site).
LIST OF FIGURES
Figure 111-1 a:
Figure 111-1 b:
Figure 111-1 c:
Off-Site Analysis Map
Downstream System Map
West Perimeter Road Basin Map
SECTION IV: FLOW CONTROL AND WATER QUALITY FACILITY
ANALYSIS AND DESIGN
FLOW CONTROL
The site is located in a Peak Rate Flow Control Standard Area. As a result, there are no flow duration or
flood protection requirements for the site. According to Exception 1 under Paragraph 1 .2.A, "Peak Rate
Flow Control Standard Areas," af the City Amendments to the KCSWDM, the facility requirement is
waived for the project if the proposed (to be developed or redeveloped) area(s) generate no more than
a 0.100 cfs increase from the existing site conditions for the 1 OO·year peak flow.
The existing and propased sites were modeled using the King County Runoff Time Series (KCRTS) model
(Figures IV-l a and IV-l b). Pervious surfaces were modeled as Till Pasture as noted previously. Based
on some minor reductions in the existing parking lot area, the net increase in 1 OO-year peak flow is
Stormwater Technical Information
Renton Aerospace Training Center, Renton, Washington
•
MAGNUSSON
KLEMENCIC
0.096 which is just under the threshold, As a result, flow control facilities are not required for the
project_
WATER QUALITYTREATMENT
There will be approximately 3,630 square feet of new plus replaced PGIS as a result of this project
(Figure 1-3c), Based on the Surface Area Exemption (Exemption 1) of Core Requirement #8, water
quality treatment facilities will not be required for the project.
LIST OF FIGURES
Figure IV-la:
Figure IV-1 b:
KCRTS Basin Information
KCRTS Peak Flows
SECTION V· CONvEYANCE SYSTEM ANALYSIS AND DESIGN
The proposed storm drain systems for the project predominantly replicate the existing storm drainage
systems, The roof drain downspouts will be tied into an existing catch basin in West Perimeter Road
while surface runoff from the ground will predominantly sheet flow to existing catch basins in the parking
lot and West Perimeter Road (Figure V-l),
Roof downspouts will be located at two low spots on the roof. The tightlined storm drain pipe that
connects to the northeast (NE) downspout is located along the easterly wall of the building, The
tightlined storm drain pipe that connects to the southwest (SW) downspout is located along the southerly
wall of the building, The SW pipe, which will be routed over the existing steep slope, will be constructed
of heat-fused high density polyethylene (HDPE) pipe and will be anchored t%n the slope (Figures V-l
and V-2),
The main deviation from the existing storm drain system is where a soldier pile retaining wall will be
constructed at the base of the steep slope, Stormwater runoff from a small area (0_062 acres) of slope
above the wall will be captured in an area drain and conveyed to a splash pad adjacent to West
Perimeter Road. From there, it will surface flow to the existing catch basin in West Perimeter Road
matching the existing conditions,
Rational flow and conveyance colculations were performed for the three new storm drain segments,
Roof NE Pipe, Roof SW Pipe, and Area Drain Pipe (Figure V-3), Although the City standard is to convey
the 25-year stormwater runoff while maintaining 6 inches of freeboard in structures, these new starm
drain pipes have been designed with capacity to convey the 1 OO-year stormwater runoff while flowing
less than full.
Because there are no new storm drainage conveyance catch basins and/or manholes, a backwater
calculation was not needed nor performed for these systems, The only storm drain conveyance
structure, the area drain, outlets to an uncontained condition, so there are no tail water impacts, The
conveyance calculations (Figure V-3) identify the pipes have adequate capacity and that flow velocities
exceed 3 feet per second.
Stormwater Technical Information
Renton Aerospace Training Center, Renton, Washington
•
LIST Of fiGURES
Figure Vol : Conveyance Map
Figure V-2: Ground-Anchored Pipe Sections and Details
Figure V-3: Rational Peak Flow Rate and Conveyance Calculations
SECTION VI' SPECIAL REPORTS AND STUDIES
MAGNlJSSON
KLEMENCIC
To our knowledge, there are no special reports or studies that have been prepared for the site.
SECTION VII· OTHER PERMITS
There are no right-of-way improvements for this project except a patch and repair crossing Rainier
Avenue North where a gas line lateral will be installed north of the building. A Department of Ecology
NPDES Notice of Intent is not required for this project because the project includes less than one acre of
ground disturbance. It is anticipated the following permits/approvals will also apply to this project:
• City of Renton Site Plan Review
• City of Renton Demolition Permit
• City of Renton Building Permit
SECTION VIII: CONSTRUCTION STORMWATER POLLUTION
PREVENTION PLAN ANALYSIS AND DESIGN
The Construction Stormwater Pollution Prevention Plan (CSWPPP) Analysis and Design includes two
parts. Part A includes a TESC Plan Analysis and DeSign and Part B includes a Conceptual Stormwater
Pollution Prevention and Spill (SWPPS) Plan. "Conceptual" is noted because the SWPPS plan is
significantly dependent on contractor means and methods and schedule. As a contractor has not yet
been selected for the project, a final and thorough Stormwater Pollution and Prevention Plan (SWPPP)
cannot be prepared.
A TESC plan has been prepared for the project in accordance with the City Amendments to the
KCSWDM and is included in this report (Figures VIII-l a through VIII-1 e). Part of the TESC requirements
for this project require the contractor to:
1) Identify/designate a TESC Supervisor for the project in accordance with the approved Ecology
Construction Stormwater General Permit and City Amendments to the KCSWDM. The
supervisor shall be a Certified Professional in Erosion and Sediment Control or a Certified
Erosion and Sediment Control Lead.
2) Prepare a formal SWPPP for the project based on their means and methods and schedule.
Stormwater Technical Information
Renton Aerospace Training Center, Renton, Washington
•
PART A -TES( PLAN ANALYSIS AND DESIGN
The TESC plan meets minimum TESC requirements as discussed below.
TES( Requirement 1: (Iearing Limits
limits of work are shown on the plans.
TES( Requirement 2: (over Measures
MAGNUSSON
KLEMENCIC
The Contractor is required to cover exposed soils. Specific criteria are provided in the TESC Plan Nates.
TES( Requirement 3: Perimeter Protection
Sedimentation barriers (straw wattles) have been shown on the plans will be installed at downstream
edges of exposed soils inside the project limits to retain sediment before runoff reaches offsite areas.
TES( Requirement 4: Traffic Area Stabilization
The stabilized construction entrance shown on the plans along West Perimeter Road is aligned at the
likely construction entrance for most of the disturbed areas and where significant excavation will occur.
TES( Requirement 5: Sediment Retention
A Baker Tank is shown on the drawings at the low end of the site. The facility is designed in accordance
with the City Amendments to the KCSWDM (Figure VIII-2). The TESC Plan Notes indicate that State of
Washington (State) water quality standards are applicable to construction site runoff.
TES( Requirement 6: Surface Water Control
Interceptor swales have been shown on the plans to convey runoff to collection areas where the runoff
will be directed to the Baker Tank. Rock check dams may be provided to maintain the stability of these
facilities where slopes require stabilization.
TESC Requirement 7: Dewatering (antral
Wet season construction will be addressed in the project specifications.
TESC Requirement 8: Dust Control
Air quality is addressed in the TESC Plan Notes.
TESC Requirement 9: Flow Control
Flow control is not required for the praject; however, some flow control may be provided within the
Baker Tank during construction.
Starmwater Technical Information
Renton Aerospace Training Center, Renton, Washington
•
PART B -CONCEPTUAL SWPPS PLAN
MAGNUSSON
KLEMENCIC
Part B, the Conceptual SWPPS Plan, includes potential pollution-generating activities and potential
pollution prevention BMPs to mitigate the activities (Figure VIII-3). Spill control and material handling
provisions will be addressed in the formal project SWPPP by the Contractor once the means, methods,
and schedule for construction have been determined.
LIST OF FIGURES
Figure VIII-1 a:
Figure VIII-l b:
Figure VIII-l c:
Figure VIII-l d:
Figure VIII-l e:
Figure VIII-2:
Figure VIII-3:
Civil Cover Sheet
Civil Notes Sheet (Including TESC Notes)
City of Renton Notes Sheet (Including ESC Notes)
TESC Plan Sheet
TESC Sections and Details
Baker Tank Sizing Calculations
Conceptual SWPPS Plan
SECTION IX: BOND QUANTITIES WORKSHEET, FACILITY SUMMARIES,
AND DECLARATION OF COVENANT
There are no flow control or water quality treatment facilities required for this project. As a result, there
are no facility summaries or declaration of covenants required for the project. A bond quantities
worksheet has been prepared for the project and is included in this report_
LIST OF FIGURES
Figure IX-l: Bond Quantities Worksheet
SECTION x-OPERATIONS AND MAINTENANCE MANUAL
OPERATIONS AND MAINTENANCE
There are no flow control or water quality treatment facilities required for this project. As a result,
operations and maintenance are restricted to private conveyance systems which include storm drain
pipes and drainage structures_ There are no actions required on the part of the Owner aside from
maintaining these facilities, which will require periodic inspection and cleaning to function properly_
LIST OF FIGURES
Figure X-l a:
Figure X-1 b:
Catch Basins and Manholes Maintenance Checklist
Conveyance Pipes and Ditches Maintenance Checklist
Stormwater Technical Information
Renton Aerospace Training Center, Renton, Washington
•
REF ERE N£ESu
City of Renton Amendments to the King County Surface Water Design Manual, 2010.
King County Surface Water Design Manual, 2009.
MAGNUSSON
KUMENCIC
Washington State Department of Ecology, Stormwater Management Manual for Western Washington,
2012.
Washington State Department of Ecology Construction Stormwater Pollution Prevention, Publication No.
12-10-030, dated August 2012, and the Construction Stormwater General Permit (effective Date
January 1,2011).
Stormwater Technical Information
Renton Aerospace Training Center, Renton, Washington
•
FIGURES
I •
MAGNUSSON
KLEMENCIC
ASSOCIATES
KING COUNTY, WASIllNGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER
Project Owner Renton Airport (contact: Jonathan Wilson)
Phone ____________ _
Address 616 W Perimeter Road, Unit A
Renton. WA 98057
Project Engineer Steven D Haluschak
Company Magnusson Klemencic Associates
Phone 206.292.1200
Part 3 TYPE OF PERMIT APPLICATION
o Landuse Services
Subdivison ! Short Subd. ! UPD
~ Building Services
M!F ! Commencal ! SFR o Clearing and Grading o Right-ol-Way Use o Other
PartS PLAN AND REPORT INFORMATION
Technical Information Report
Type of Drainage Review CM>! Targeted
(circle): Large Site
Date (include revision 7/27/15
dates):
Date of Final:
Part6 ADJUSTMENT APPROVALS
!
Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Name Renton Aerospace Training Center
DOES Permit # _________ _
Location Township
Range
Section ______ _
Site Address 300 Rainier Ave North, Renton. WA
Part 4 OTHER REVIEWS AND PERMITS
o DFWHPA o COE404 o DOE Dam Safety o FEMA Floodplain o CaE Wetlands
o Other
o Shoreline
Management o Structural
RockeryNaultl __ o ESA Section 7
Site Improvement Plan (Engr. Plans)
Type (circle one): @II)! Modified !
Small Site
Date (include revision
dates):
Date of Final:
Type (circle one): Standard ! Complex ! Preapplication ! Experimental! Blanket
Description: (include conditions in TIR Section 2)
Not Applicable
Date of Approval:
Figure 1-1: TIR Worksheet
2009 Surface Waler Design Manual 1/9/2009
1
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part7 MONITORING REQUIREMENTS
Monitoring Required: @/No
Describe: TESC Water Quality
Start Date: TBD
Completion Date: TBD
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan: -,-No_t_A:,,:.PP_lica_ble _________ _
Special District Overlays: _______________________ _
Drainage Basin: -:-_-,-___________ _
Stormwater Requirements:
Part 9 ONSITE AND ADJACENT SENSITM: AREAS
DRiver/Stream _________ _ ~ Steep Slope Easterly Side of Site
o Lake o Erosion Hazard _______ _ o Wetlands __________ _ o Landslide Hazard _______ _ o Closed Depression _______ _ o Coal Mine Hazard ______ _ o Floodplain __________ _ o Seismic Hazard _______ _ o Other __________ _ o Habitat Protection _______ _
0 ________ _
Part 10 SOILS
Soil Type Slopes Erosion Potential
UR 0-3% Low
15-75% low. Area Not Disturbed UR Ex~~t @ ~hQring
o High Groundwater Table (within 5 feet) o Sale Source Aquifer o Other o Seeps/Springs
o Additional Sheets Attached
2009 Surface Water Design Manual
2
[19/2009
KI:"-IG COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE LIMITATION 1 SITE CONSTRAINT
o CQre2 Offsite Anallr:sis
(8) :;Jensi\iv!!/Qriti!;al Ar!;las Drain Away From Steep Slope
o SEPA
o Other
0
o Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area)
Threshold Discharge Area:
(name or descriptio.,)
Core Requirements (all 8 apply)
Discha/1le at Natural Location Number of Natural Discha/1le Locations: None Available
Offsite Analysis Level: (91 2 1 3 dated: 7127115
Flow Control Level: 1 I 2 1 3 or Exemption Number Exception 1
(incL facility summary sheet) Small Site BMPs
Conveyance System Spill containment located at: Not A!2!2licable
Erosion and Sediment Control ESC Site Supervisor:
Contact Phone: TBD by Contractor
After Hours Phone:
Maintenance and Operation Responsibility: ~ivat.yl Public
If Private. Maintenance LOll Required: ifes:;t No
Financial Guarantees and Provided: ~/No
Liability
Water Quality Type: Basic 1 Sens. Lake 1 Enhanced Basicm 1 Bog
(include facility summary sheet) or Exemption No. j
Landscape Management Plan: Yes 1(No)
Special Requirements (as applicable)
Area Specific Drainage Type: CDA 1 SDO I MDP 1 BP I LMP 1 Shared Fac . .(None
Requirements Name:
Floodplain/Floodway Delineation Type: Major 1 Minor I Exemption I~
100-year Base Flood Elevation (or range):
Datum:
Flood Protection Facilities Describe: Not Applicable
Source Control Describe land use:
(comm.lindustriallanduse) Describe any structural controls: Not Applicable
2009 Surface Water Design Manual 119/2009
3
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Oil Control High-use Site: Yes /~
Treatment BMP:
Maintenance Agreement: Yes /®
with whom?
Other Drainage Structures
Describe:
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION AFTER CONSTRUCTION
liSl Clearing Limits liSl Stabilize Exposed Surfaces
~ Cover Measures GSI Remove and Restore Temporary ESC Facilities
~ Perimeter Protection ~ Clean and Remove All Silt and Debris, Ensure
GSI Traffic Area Stabilization Operation of Permanent Facilities
GSI Sediment Retention o Flag Limits of SAO and open space
~ Surface Water Collection
preservation areas o Other ~ Dewatering Control
lEI Dust Control
~ Flow Control
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facilitv Summary and Sketch)
Flow Control Type/Description Water Quality Type/Description
o Detention o Biofiltration
o Infiltration o Wetpool
o Regional Facility o Media Filtration
o Shared Facility o Oil Control
o Flow Control o Spill Control
BMPs o Flow Control BMPs o Other o Other
2009 Surface Water Design Manual 1/9/2009
4
KING COUNTY, WASHICIJ(;TON, SURfACE W A n,f{ DESIGN MANU A L
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 15 EASEMENTSfTRACTS Part 16 STRUCTURAL ANALYSIS
o Drainage Easement o Cast in Place Vault o Covenant 1]1 Retaining Wall o Native Growth Protection Covenant o Rockery> 4' High o Tract o Structural on Steep Slope o Other o Other
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
incorporated into this worksheet and the attached Technical Information Report. To the best of my
knowledge the information provided here is accurate. ~
7/27115
~ned/D8/e
2009 Surface Water Design Manual 1/9/2009
5
•
AGNUSSON
KLEMENCIC
N <,r-( I AH<,
Figure 1-2: Site Location Map S HEET NO .
t ,
..,
•
AG NU SS ON
KLEMEN C IC
ASSOUAlt::.
•• WI •
,
Soil Ty p e PITS _ 51<
_.ll<JB ~D Pc _SIn
Grouna-...aUIt P rCMc1Kln Nwl 8ounc1ilry _ AgC _ bS 1,41 _ pi( SO
Aq""'PlOledoon~NZunel _AgO _E~C _Ng .Pu _Tu
1 ~'·_'._I c::JAql.lferProl lldioo1~NZ~1Mod''1'''_AI<'' _E...o _Nk _P'f .U.
o 1 2 __ c:::::::J __ c:::=-_______ Mi les
_"'''D <we _No _ROC_W
_""".'"' _'" _ROE _'No _N"o _InC .OS _Re _"'" _.0 _0.<:_"" -'"" _ .. , -""'-'"
1--___ F_i_9_u_r_e_I_-4_a_: _S_o_i I_S_u_rv_e_y_M_a_p ___ --j S HEET NO .
0 +-ro (l) >-(l) co 0 -z z
5 f-
LJ.J LJ.J ....... -7 ~ ~ LJ.J
I .-:"'~-~ 0 Vl
0
<;I-
-0
<;I-
"
~
0 r" I I 0
I I N
(l)
I I c
0 '-'
I I '" <;l-
I I
I I
I) v
---, C __ -J
OeL
Z >--
=> f-e a::: -(!:)~ Legend Area u..Z
0<1:
SF CD ACRE cna::: D Pervious f-=> Surface (P) P 19 ,323 0.444 _ f-
:Ecn
:Jo IP 7 ,515 0 .173 D Impervious
Total 26,837 0.616 Surface (IP)
-
r--1 rL---e--;
I I \ I
\ \ ~ ~
\ L---\
I I
I I
\ ~ ~ I
•
\
I
.
u--~I ~
l.....r-\."------"'-""-"-..JJ'""-~ ......
I I
I )
\ '( '-'--1-,--\ .)C ~~----i ~~
\ ( "
-e~m Offsite Flows Bypass Site -" ,
I I
I I
I \
I I
I I
I )
I r----~
I I ~J
I=igure 1-3a: Existing Site Basin Map
lJJ 0 <D (0
ct I"-'<t ....
() ~ '<t "!
<:( 0 0 0
0 '" ro ...... ~
a> ;:: >-0 a> i:! en ~ Z Z
CO 0 CJ) r-..
Q) l.i... 0 C') ..,
L-V) '<t '<t ClO « 0> (0 I"-~ N
! I-w w ~ !;;: w
I 0 0 V) --0
<T
-0
a. !!: S
0
<T
"
I-~
~ 0
(L ",0..
::J-"'~ O~
"0 ::J (]) .-(])
C o 0 ~ 0 .-ro (]) ro
Q) ~'t: c..'t:
Ol (]) ::J E ::J
Q)
o..(/) -(/)
.....J D D
0
N
a>
co
0 u
V'> <T
Q.
Da.. m
Z>-:!: ::::> I-
0 a: -c::: <!)~ .-
lL..Z en 0«
CD m (f)a: III 1-::::>
-I-:::;: (f) CI> --....J D -.-en
"C
• CI> en
0
Q.
(]) 0 -Ui ...
rJ) a.
rJ)
ctl •• c.. .c >-III M
rJ) I
i:: -0 CI> LL ...
(]) ::::I -£ C)
0 .-
E LL
ctl
(])
~ -'" c..
:J
2
;;:
~
"-
'" D-
C'-
6 r
"'" ~
= • ~
" ~
'" "'" u
<i
~
'" w = g ." .5
~
~
g' = ~ g.
if> .;;; = c::
'" <;
~ w
'" w = o c ." .5
~
~ o = o
." u
" u
~ > u
c
U
~
~ w
'" -c:
I r
"'" D-
~
-
'-_---\" "'7' ---" '\ '),,%:'1'''7 ""m
'I
'--__ -f\.-_ - - --,",--..
u
LIMITS OF GROUND
DISTURBANCE, TYP
n
II
I I u
Legend
New
PGIS (N)
Replaced
PGIS (R) Total I 3 ,633 I 0.083
'\ ] L------
40 20 0 40
scale 1" = 40'
80
feet
E I
~ I I DATE : 7 /27 /15 I
~ .. Figure 1-3c: New Plus Replaced Pollution Generating Impervious Surface (PGIS) Map ~~~\tN~:
;:;IM AGNUSSON ;g KLEMENCIC
N
~ ASSOCI ATES
N ;:::: II Structural + Civil fngin_n II
•
I N"~'-' .I ~USSON
KLEMENC IC
,l.SSOC It.HS
, ,
Wellfield Capture Zones
Five Year Capture Zone
D Te n Yea r Capture Zone
Cedar Valley Sole Source
Aquifer Project Review Area
Streamflow Source Area
Aquifer Protection Area Zones
[ill Zone 1
CJ Zone 1 Mod ifted
c=J Zone 2
Network Structure
• Production We ll
• Springbrook Springs
Cedar Valley Sole Source Aqu ife r C.:'] Renton City lim its
[~~J Potenllal Annexation Area
f
•
o 2 __ r:::= __ r:::= ________ .Miles
1-___ F_i9_u_r_e_II_-1_a_: _G_r_o_u_n_d_w_a_te_r_M_a_p __ ----1SHEET NO .
•
\
-5€ 7-2nd S t
to.
W"mngr.".
'" Z
'< NtlthSt t ~
'" j c
~ ~ w
• •
o 2 _1I::::::::::JI_c::=-_____ M il es
Flow Cont rol Standards
C=:J Peak Rate Flow Control S tandard (EX1SlJng Site Cond lOons )
~ Flow Control Duration Standard (Existing Site Conditions )
'" .. Flow Control Duration Standard (Forested Conditions )
('l .. Flood Problem Flow
\ c:J UnincorporCited King Coun ty Flow Control Standards 1 _ .. -
~ L __ .! Renton City Limits if --.. , \."-L._._._.l.p.ot.~.M .. 'An .. n.e, ••• ,on .. A.,.e· .................... "1
•
AGNUSSON
KLEMENC IC
f-F_i_9_u_r_e_I_I-_1_b_: _F_lo_w_C_o_n_t_r_o_I_A_p_p_l_ic_a_t_io_n_M_a_p--j SHEET NO .
ASSOCIA'{S
j •
" ,
"
(,like WlIsIJinglull
.~ .-" J , \.
i j •. j .......
: I '._ ..
! "
.. i ,,,: ..... \
i I
'-. ,; "".-~'....!:"'"
• I
."/ '\ ,
,~-:--,
. .. !
\ i i·,,·
"j I •.
\
,
.~ ... i
'':'"... t.
,
"
, ~r ,
J , I,
I , • \ • .. I : ..... ~ ... ..,~I • ! " r •
" I \. ,
,
. ' "')1 ~
." or.
, ., 'I • ! '
,
-" i
ZO,"'""
"";'-';,,\ ..... ~
.\ .. --"",,,,
",
,
, I ,
.,
• f .......
"
, ,
I. I , , ,
I
Revised FEMA Preliminary DFIRM Nov. 2010
a 1,600 3 .200 Fee t
, I I I I II I ,
C.J F'Io''''''Crty L .....
[~:J ""'onuI"""""-''''oollo<-...,. DF_,
-~Aoo.o o.-•• _(ft)
Regulatory --, N o n~·9 ul~ory -,
,.,.,. ........ '-""" ............. ,. .... '00 .... ''''''''
~-,~)
'-' ... " .. ""' .... """", ....... "_,~ __ .. ""' __ ... ·'00_' ....... _·..,'00,.6 _
~ ....... "" ..... ~-I
Th i$ map ,§ b.1$e d upon the best technica l informat ion and recent
flood 5tud 'f>~ th.:lt ha~e bf'en .:Ipproved b y FEM A or haw been
~vbmi tled to FE M A for app ro .. al. The nood halard a real are
different t han t tlose shown on the rurrent FE M A effectl~ Fl ood
I nsur~n<e Ra t e Maps (F IR M! for Rent on.:l/ld t hiS map shoul d not
be used l or deter milling flood in ~u rance requiremenh
7/27 115
•
MAGNU SS ON
KLEMENCI C
f--__ F_i_9_u_r_e_I_I-_1_C_: _F_I_o_o_d_H_a_z_a_rd_M_a_p __ ----I S HEET NO,
AS SOC IAT ES
AGNUSSON
KLEMEN CIC
ASSOC AleS
~ __ F_ig_u_r_e_II_I-_1_ a: _O_ff_s_i_te_A_n_a_IY_s_i_s_M_a_p_------lSHEET NO .
Task 1 Study Area
•
AGNUSSON
KLEMEN C IC
A~SOC A-rs
t---_F_i9_u_r_e_III_-_1_b_: _D_o_w_n_s_t_r_e_a_m_S_y_s_te_m_M_a_p----ISHEET NO .
(Part 1)
1M Alol"U SSON
K LEMENC I C
ASSOCIATES
Figure 111-1 b: Downstream System Map NO .
(Part 2)
•
NUS SON
KLEMEN C I C
,\SSOCI!I,li:-S
I-_F_i9_u_re_II_I-_1_b_:_D_o_w_n_s_t_re_a_m_S_y_s_te_m_M_a_p-----;SHEET NO .
(Part 3)
•
NU SSO N
KLEME NC IC
ASSOCIATES
Figure 111-1 b: Downstream System Map NO .
(Part 4)
•
AGNUSSON
KLEMENCIC
ASS OC !ln~
CO'NNECTS TO PRIMARY
...""., SYSTEM ALONG
PERIMETER ROAD
-HtlU FT (0.167 MI)
DOWNSTREAM OF
CONNECTION POINT
I-_F_i9_u_re_II_I-_1_b_:_D_o_w_n_s_t_re_a_m_S_y_s_te_m_M_a_p----ISHEET NO .
(Part 5)
\ ,1 \ . . .
•
NU SSO N
KLEMEN C IC
ASSOCIA1ES
Figure 111-1 c: W Perimeter Road Basin Map SHEET NO
(Upstream of Connections)
Hourly
Time Step
Hourly
Time Step
•
MAGNUSSON
KLEMENC IC
ASS<.K:AH::.
)
)
Renton Aero space Train i ng Center
97751.50
KCRTS Basin I nformation
: lfi KeRTS
K1ng County Runoff T1Me Series Program
VerSlon 6 .00
All files viII be read/wr i tten in the Working Directory
Working Directory C 'kc_5wdn'outpu t
KCRTS Comlland
CR EATE a new Tille Series
Production of Runoff T1Me Serles
Projec t Locatlon Sea-Tae
CO llpuling Series 20150720 RATe EXls tl ng Basin lsf
Reg ional Scale Factor 1 00
Data Type Reduced
Creat lng Hourly TiMe Series Fi le
loadl n g Time S e ries
T 1l 1 Pasture 0 .44 acres
F ile C :'\.KC_ SWD M'KC_
Seal ing
DATA 'ST TP 60R
Yr 8
loadlng Tille Series F i l e C :'KC_ SWDM'KC_DATA 'ST EI60R
ImperViOUS 0 .1 7 acres Adding Yr . 8 --------------
Total Ar ea 0 .62 acr es
Peak Dlscharge " 0 135 CFS at 6 :00 on Jan 9 In Year 8
rnf 8
rnf 8
St orlng Tlme Series File 20150720 RATC EXlstlng Basln tsf 8
Project Locatlon
Compu tlng Series
Reg lona l Scale Factor
Time Ser ies Computed
KCRT S Comman d
CREA TE a nev Tlme Serles
Production of Runoff Tlme Ser l es
Sea-Tac
20 1S0 72 0
1. 0 0
RAT C Proposed Basln .tsf
Data Type Reduced
Creating Hour l y Time Series F ile
Load i ng T1Me Serles File C 'KC_SV DM 'KC_DATA 'STTP60R rn f
Tl11 Pasture 0 .17 acres Scallng Yr . 8
Loading T1 Me Series File C 'KC_SVD M'KC_DATA 'STE I 60R rnf
I JlperV l ous o 4 5 a c res Addlng Yr 8
Total Area 0 62 acr es
Peak Discharge 0 23 1 CFS at 6 :00 on Jan 9 in Year 8
Storing Time Series Fl le :201 50720 RATC Proposed Bas i n .ts f
Time Serles Co mputed . ( III
8
8
8
IUA II::: 7/27/15
I-_F_i9_U_re_IV_-1_a_:_K_C_R_T_S_B_a_S_i n_1 n_fo_r_m_a_ti_o_n--l ~~~~N N~
.
.
Renton Aerospace Train i ng Center
97751.50
KCRTS Peak Flow s
~ .Help I Files· KCRTS ...... I l =l §], ~ I
~
Flow Frequency Analysis
--------------------------------------------------------
Time Ser ies F ile .20150720 ra te existing basin .tsf
Project Location Sea-Tac
---Annual Peak Flow Rates--------F low Frequency Analysis-------
F low Rate Rank Time of Peak --Peaks --Rank Return Frob
(C FS) (C FS ) Period ( 0 .066 5 2/09 /01 2 ,00 10.135 1 100 .00 0 .990 1 Exist
0 .049 7 1 /05/02 16 00 0 077 2 25 .00 0 .960
0 077 2 2 /27 /0 3 7 ,00 ° 072 3 1 0 . 00 ° .900
O. 045 8 8 /2 6 /04 2 ,00 0 .068 4 5 00 0 .800
0 .05 4 6 10 /28 /04 16 00 0 .066 5 3 00 O. 667
° 072 3 1 /18 /0 6 16 ,00 0 .0 54 6 2 .00 0 500
0 .068 4 11 /24 /06 3 00 0 .049 7 1 30 0 231
O . 135 1 1 /09 /08 6 00 0 .045 8 1 .10 ° 091
Computed Peaks 0 .116 50 00 0 980
Flow Frequency An alysis
--------------------------------------------------------
Time Series File :20150720 ratc proposed basin t~f
Project Location :5ea-Tac
---Annual Peak Flow Rates--------Flow Frequ e ncy Analysis-------
Flow Rate Rank Time of Peak --Peaks --Rank Return Pro b
(CFS ) (C FS) Period
0 117 6 2 /09 /01 2 ,00 10 231 1 1 00.00 ° .990 1 ( Proposed
0 .100 8 1/05 /02 16 ·00 0 .162 2 25 .00 0 .960
0 140 3 12/08/02 18 · 00 0 .14 0 3 10 .0 0 ° .900
0 .112 7 8 /26 /04 2 .00 0 13 3 4 5 .0 0 0 .800
0 133 4 10/28/0 4 16 ·00 0 126 5 3 .0 0 0 .667
0 .126 5 1/18 /06 16 .00 0 117 6 2 00 0 .500 ~ 0 16 2 2 10 /2 6 /06 0 0 0 ° 112 7 1 .3 0 0 .2 31
0 .231 1 1/09 /08 6 ,00 O. 100 8 1 .10 0 .091
Computed Peaks 0 .208 50 00 0 .980 ~
• ~ III 1 , ...
Delta" 0.096 CFS
! Uf\ It : 7/27 /15
Figure IV-1 b: KCRTS Peak Flows BY ·
SHEET NO.
MAGNUSSON
KLEME NC IC
ASSOCIATtS
Figure V-3: Rational Peak Flow Rate and Conveyance Calculations
Renton Aerospace Training Center
97511.50
Rational Flow Calculations
0= CIA, where I = PRi R and
PR (in) =
iR = aR x Te A(-b R), where
aR =
bR =
Pipe
Roof NE
RoofSW
Area Drain
c
0.9
0.9
0.2
25 Years
3.4
2.66
0.65
Area (ac)
0.158
0.149
0.062
100 Years
3.9
2.61
0.63
Tc (min) i25 025 (cfs)
6.3 0.804100 0.39
6.3 0.804100 0.37
6.3 0.804100 0.03
1:\RentonAeroCntrCiv\Calculations\Drainage\Conveyance\20150722 RATe Rational.xlsx \ 20150722 RATe Rational Cales
i100 0100 (cfs)
0.818570 0.46
0.818570 0.43
0.818570 0.04
Worksheet for Roof NE Pipe 100-Yr Normal Depth
Project Description
Friction Method
Solve For
Input Data
Roughness Coefficient
Channel Slope
Diameter
Discharge
Resu/lS
Normal Depth
Flow Area
Welted Perimeter
Hydraulic Radius
Top Width
Critical Depth
Percent Full
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Maximum Discharge
Discharge Full
Slope Full
Flow Type
GVF Input Data
Downstream Depth
Length
Number Of Steps
GVF Output Data
Upstream Depth
Profile Description
Profile Headloss
Average End Depth Over Rise
Normal Depth Over Rise
Downstream Velocity
Manning Formula
Normal Depth
SuperCritical
0.010
0.00750 ftllt
0.50 ft
0.46 ft'ls <
0.32 ft
0.13 ft'
0.92 It
0.14 It
0.48 It
0.35 It
63.3 %
0.00586 ftllt
3.51 ftls
0.19 It
0.51 It
1.19
0.68 ft3 /s
0.63 ft 3 /s
0.00398 ftllt
0.00 It
0.00 It
o
0.00 It
0.00 It
0.00 %
63.33 %
Infinity ftls
<
<
Q100
-2/3 Full
>3 ftls
Bentley Systems, Inc. Haestad Methods SolElkld,,-Master val (SELECTseries 1) [08.11.01.03]
1122120155:09:44 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2
Worksheet for Roof NE Pipe 100-Yr Normal Depth
GVF output Data
Upstream Velocity Infinity ftls
Normal Depth 0.32 It
Critical Depth 0.35 It
Channel Slope 0.00750 ftIft
Critical Slope 0.00586 ftlft
Bentley Systems, Inc. Haestad Methods Sola.ad .... MasterVSi (SELECTseries 1) (08.11.01.03]
1122120155:09:44 PM 27 Siemons Company Drive Suite 200 W Watertown. CT 06795 USA +1-203-755-1666 Page 2 of 2
Worksheet for Roof SW Pipe 100-Yr Normal Depth
Project Description
Friction Method
Solve For
Input Date
Roughness Coefficient
Channel Slope
Diameter
Discharge
Results
Normal Depth
Flow Area
Wetted Perimeter
Hydraulic Radius
Top Width
Critical Depth
Percent Full
Critical Slope
Velocity
Velocity Head
Specific Energy
Fraude Number
Maximum Discharge
Discharge Full
Slope Full
Flow Type
GVF Input Data
Downstream Depth
Length
N umber Of Steps
GVF Output Date
Upstream Depth
Profile Description
Profile Headloss
Average End Depth Over Rise
Normal Depth Over Rise
Downstream Velocity
Manning Formula
Normal Depth
SuperCritical
0.010
001000 ftlft
0.50 ft
0.43 ft'/s ..;(:---Q100
0.28 ft ~---1/2 Full (
0.11 ft'
0.84 It
0.13 It
0.50 It
0.33 It
55.2 %
0.00562 ftlft
3.87 """,,-->3 ftls ftls (
0.23 ft
0.51 It
1.44
0.78 ft'/s
0.73 ft3/S
0.00348 ftllt
0.00 It
0.00 It
o
0.00 It
0.00 It
0.00 %
55.22 %
Infinity ftls
Bentley Systems, Inc. Haestad Methods SolBMIIlltQll'lllrlMaster V81 (SELECTseries 1) [08.11.01.03]
7122120155:09:03 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2
Worksheet for Roof SW Pipe 100-Yr Normal Depth
GVF Output Data
Upstream Velocity Infinity fils
Normal Depth 0.28 It
Critical Depth 0.33 It
Channel Slope 0.01000 ftIft
Critical Slope 0.00562 ftIft
Bentley Systems, Inc. Haestad Methods SoI""H~aster VBi (SELECTseries 1) [08.11.01.03)
7122120155:09:03 PM Z'1 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203·755-1666 Page 2 of 2
Worksheet for Area Drain Pipe 100·Yr Normal Depth
Project Description
Friction Method
Solve For
Input Data
Roughness Coefficient
Channel Slope
Diameter
Discharge
Results
Normal Depth
Flow Area
Wetted Perimeter
Hydraulic Radius
Top Width
Critical Depth
Percent Full
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Maximum Discharge
Discharge Full
Slope Full
Flow Type
GVF Input Data
Downstream Depth
Length
Number Of Steps
GVF Output Data
Upstream Depth
Profile Description
Profile Headloss
Average End Depth Over Rise
Normal Depth Over Rise
Downstream Velocity
Manning Formula
Normal Depth
SuperCritical
0.010
0.01600 ftlft
0.33 ft
0.04 ft'/s ",,(~---Q'00
0.08 ft
0.02 ft,
0.34 ft
0.05 ft
0.28 ft
0.11 ft
24.4 %
0.00482 ftlft
2.47 ftls
0.10 ft
0.18 ft
1.83
0.33 ft'/s
0.30 ftl/s
0.00028 ftlft
0.00 ft
0.00 ft
o
0.00 ft
0.00 ft
0.00 %
24.41 %
Infinity ftls
~---1/4 Full <
( -<e:---Full Pipe >3 ftls
BenUey Systems, Inc. Haestad Methods Sol-.aHd)aNlwMaster V8i (SELECTseries 1) [08.11.01.03]
7/22120155:08:38 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2
Worksheet for Area Drain Pipe 100-Yr Normal Depth
GVF Output Data
Upstream Velocity Infinity ftls
Normal Depth 0.06 ft
Critical Depth 0.11 ft
Channel Slope 0.01600 ftJft
Critical Slope 0.00482 ftJft
Bentley Systems, Inc. Haestad Methods SoI..,It~aster val (SEI..ECTseries 1) [08.11.01.03]
7J2212015 5:08:38 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2
MAGNUSSON KLEMENCIC ASSOCIATES
Renton Aerospace Training Center
97751.50
Baker Tonk Sizing Calculotion
Notes:
1) The design of the Baker Tank is based on City of Renton Amendments (2010) to the King County Surface Water Design
Manual (2009)
2) The design inflow is based on the 1 O-Year storm as calculated with a 15-Minute time step using KCRTS for the tributary
drainage area (total proiect disturbed area was used for this calculation)
3) See attachment for KCRTS Flow/Sizing Calculation
Tributary Area
Total Area =
% Impervious
% Pervious
26,840 ft2
0%
100%
0.6162 oc
0.0000 ac
0.6162 ac
.... ___ O.;;,;;1O:..._..;0;;, . .,;13;,;5:.........;;,cf,;,s __ .....II*see note 3 above
Tank Surface Area:
Required:
SA ~ 20 1OJY"d
SA Pond Surface Area
QlO ·See note 3 above
Vs~d Settling Velocity (use Medium silt settling velocity of 0.00096 ft/sec)
0.00096 ft/sec
SA ~ 281 ft2
Provided:
SA ~ 281 ft'
Settling
Sediment
Totol
Required Tank Volume =
Proposed L 1 =
Proposed L2 ~
Proposed W =
Proposed H ~
UWE
2ft
3 ft < =Sed storage
5 ft
1,406 cf
23 ft
Volumes:
Settling
Sediment
Totol
8
9.67
ft (use if a second tonk in poncllel is needed)
It
It (LxWxH) ~
563 cf
844 cf < =5ed storage
1,406 cf
1,779 cf ~ 13,309 gallons
Figure VIII-2: Baker Tank Sizing Calculation
1:IRentonAeroCntrCivlCalculationslOrainage ReportlFigslSupporting Inlo120150723 KCRTS Baker Tank Sizing. xis
15 Minute
Time Step
)
Renton Aerospace Training Center
97751.50
KCRTS Baker Tank Sizing
~ _ 0 x
Klng Count9 Runoff T1Me Series Frograa
Version b.OO
11 files will be read/written in tbe Vorking Directory
orklng Dlrectory:C_'-kc_swdM"-ol,ltput
KeRTS COIIIJland
CREATE a new T1Me Serles
Produotion of Runoff TiRe Series
Sea-Tae Project location
Ca.puting Series
ional Scale Factor
Data Type
is-Minute Tille
20150722 RATe Baker Tank tsi
1. 00
Reduced
Series File
loading TiRe Series File:C 'KC_SVD~KC_DATA'STTG1SR rof
Grass o 62 acres ScalUlg Yr B
Total Area 0 ~2 acres
DJ.=harge: 0.311 CFS at 6; 30 on Jan 9 in Year 8
Storlng Time Series Flle:20150722 RATC Baker Tank_tsf
Tine Series Computed
{(eRTS COJ\JI.and
Enter the Analysis TOOLS Module
AnalYS1S Tools Co ... and
Coapute PEARS and Flow Frequencies
Loading Stage/Discbarge curve 20150722 rate baker tank lsf
Flow Frequency analysis
TlRe Series File 20150722 ratc baker tank.tsf
Project Location,Sea-Tac
Freqwsncles & Peaks saved to Flle:Z0150722 RATe Baker Tank Slzing.pks
~ • .w CJ X
TT" • -
~ --
Flow Frequency Analysls
Ti~e Serles File:20150722 rate baker tank.tsf
•
CONCEPTUAL STORMWATER POLLUTION PREVENTION
AND SPILL PLAN
Renton Aerospace Training Center
Renton, Washington
July 27,2015
I •
MAGNUSSON
KLEMENCIC
ASSOCIATES
130 I Fifth Aven\!e, Suite 3200
Seotlle, Washington 981 0 1-2699
T 206 292 1200 F: 206 292 1201
SECTION 1· PRO lEO DESCRIPTION
SEcnOYLLBOSION CONTROl SPECIAliST
SECTION 3 EXISTING SITE CONDITION~_
SECIIQN 4 ADIACENT AREAS
SECTION 5 CRITICAl AREAS
SECTION 6 50115
SECTION 7· POTENTIAl EROSION AND POLLUlION-GENERATING
ACTIVITI ES
SECTION 8· CONSTRIJCTIObi BMPS
Port A -TESC Pion Anolysis ond Design
Port B -Conceptuol SWPPS Pion
MAGNUSSON ~
KLEMENCIC ~
A'-',(:o( 1"'.1)' •
2
2
2
3
S£CllON 9· POTENTIAl CONSTRIJCTION PHASING AND SCHEDlJLE 6
Conceptual Stormwater Pollution Prevention and Spill Plan Table of Contents
c """'':~'''''''''''''''.:-'''''~:'!II,,...rWI·li-·''''''''''!y··i<''':''"~f""'''' I I I "'WC1O .... ''',''''''_ ••••• l1li } li,cl'~~.,."i,~·tt"iW"J"~\ r¥~ ,4&q~.,!J."i:'.R",1f,',~.,.,~-'II! • _! I~U~~.r..-m;,:~~~!-"
Renton Aerospace Training Center, Renton, Washington
MAGNUSSON
KLEMENCIC
SEC T ION 1· PRO J E C T DES C R J P--,T-,-J '"'OuN"----______________ _
The Renton Aerospace Training Center (RATC) project in the City of Renton (City), Washington, is
located at 300 Rainier Avenue North, at the southwest corner of the Renton Municipal Airport where
NW 3rd Place intersects Rainier Avenue North. The project is long and narrow, bordered at the west by
Rainier Avenue North, at the east by West Perimeter Road (a private road awned by the Renton
Municipal Airport), and at the north and south by undeveloped lands.
The proposed RATC project is a 23,000-square-foot (-12,760-square-foot footprint), three-story facility
that will provide training and job simulations for a workforce entering the region's aerospace
manufacturing industry.
The project includes the following tasks:
• Removal of the existing building.
• Construction of a new building, which includes a lobby, administrative area, shop space, design
and fabrication space, classrooms, and a building services core.
• Shoring along the north, south, and west sides of the new building lower floor.
• Partial removal of the existing asphalt parking lot
• Construction of a new ADA accessible paved entry route.
SECTJON 2· EROSJON CONTROl SPECJALIST
An Erosion and Sediment Control (ESC) supervisor has not been designated for the site at this time
because the contractor, who will be required to designate the individual for this role, has not yet been
selected for the project.
SECTJON 3· EXISTING SJTE CONDJTlONS
The site is lacated east of Rainier Avenue North, which functions as an interceptor swale for upstream
flows. As a result, there are no off-site flows directed to the site. The westerly portion of the site is
relatively flat and includes an existing building, paved walks and parking lot, and landscaped area
surrounding the building. The easterly portion of the site includes a steep slope that is approximately 30
feet high and connects the elevated westerly portion of the site to West Perimeter Road. The steep slope
was not a natural condition but was constructed by placing filion the westerly portion of the site during
construction of the previous (current) site development. The existing site includes approximately 0.6
acres of impervious area_
SECTJON 4-AD JACENT AREAS
The easterly boundary of the site at West Perimeter Raad is an extension of the Renton Municipal
Airport. As a result, the area east of the site is relatively flat. The areas north and south of the site are
extensions of the site topography that crosses the site in the east-west direction. The area west of the
site increases in elevation from Rainier Avenue North toward the west. Because stormwater runaff from
Conceptual Stormwater Pollution Prevention and Spill Plan
Renton Aerospace Training Center, Renton, Washington
•
MAGNUSSON
KLEMENCIC
"" "'., .
the west is intercepted before it reaches the site and the areas north and south drain parallel with the
site, the only significant interaction of stormwater (and construction stormwater) runoff between the site
and adiacent areas is at the storm drain connections along West Perimeter Road.
SECTION 5· CRITICAl AREAS
As previously noted, the easterly portion of the site includes a steep slope that is approximately 30 feet
high and connects the elevated westerly portion of the site to West Perimeter Road. To protect the
existing slape, storm water (and construction stormwater) will be directed away from the slope.
SECTION 6· SOli S
According to the City Soil Survey Map, the sails at the site appear to be predominantly Urban Land (Ur).
The existing soil conditions were described in the Geotechnical report by Soil & Environmental
Engineers, Inc:
In genera/, the subsoils include loose fill over competent native soils. Based on the visual
classification and the blow count data, we believe that the fill was placed randomly and without
compaction. The native soils below the fill include alluvial soils over glacially deposited
maferia/s.
SECTION 7: POTENTIAL EROSION AND POLLUTION-GENERATING
ACTIVITIES
Erosion problems during construction of the RATC proiect are unlikely if the BMP guidelines shawn an
the plans and outlined in this report are fallowed. Off-site flaws that could cause erosion within the
praiect limits are intercepted and do nat enter the site. Most of the disturbed area will either be within
the building excavation area adiacent to soldier piles and/or under the stabilized construction access for
the site. Most of the potential erosion should be limited to areas where un concentrated sheet flaws of
construction stormwater runoff occur.
Consistent with the general permit requirements, potential pollutants ather than sediment will be
handled and disposed of in a manner that does not cause contamination of storm water. Non-sediment
pollutants that may be present during construction activities include:
• Petroleum products including fuel, lubricants, hydraulic fluids, and farm ails
• Polymer used for sail stabilization
• Water treatment chemicals (coagulant, acid, sodium bicarbonate)
• Concrete
• Paints
• Fertilizers
These materials, and other materials used during construction with the potential to impact stormwater,
will be stored, managed, used, and disposed of in a manner that minimizes the potential for releases to
the environment and stormwater,
Conceptual Stormwater Pollution Prevention and Spill Plan
Renton Aerospace Training Center, Renton, Washington
SECTION 8· CONSTRIICTION BMPS
CLEARING LIMITS
MAGNUSSON
KLFMENCIC
Clearing limits are shown on the attached drawings and will be flagged prior to construction.
CONSTRUCTION ACCESS
A temporary construction access will be created by West Perimeter Road adjacent to the majority of the
excavation on site. A wheel wash area with sand bag runoff containment system will also be installed
on the existing parking lot.
FLOW RATES
Flow contral is not required for the project; however, some flow contra I may be provided within the
Baker Tank during construction.
SEDIMENT CONTROLS
A Baker Tank is shown on the drawings at the low end of the site. The facility is designed in accordance
with the City Amendments to the King County Surface Waster Design Manual. The TESC Plan Notes
indicate that State of Washington (State) water quality standards are applicable to construction site
runoff.
SOIL STABILIZATION
The construction drawings and specifications identify guidelines that shall be adhered to regarding soil
stabilization.
SLOPE PROTECTION
To protect the steep slope on site, the contractor shall divert construction storm water away from the top
of slope.
DRAIN INLET PROTECTION
Adjacent downstream or down-slope catch basin inlets will be protected per the City of Renton standard
inlet protection detail and per the following guidelines:
• Storm drain inlets operable during construction shall be protected so that surface water runoff does
not enter the conveyance system without first being filtered or treated to remove sediment.
• Approach roads shall be kept clean.
• Inlets should be inspected weekly at a minimum and daily during storm events. Inlet protection
devises should be cleaned or removed and replaced before six inches of sediment can accumulate.
Conceptual Stormwoter Pollution Prevention and Spill Plan
Renton Aerospace Training Center, Renton, Washington
•
MAGNUSSON
KLEMENCIC t«...-< .\'c· •
POllUTANT (ONTROl
Sediment-laden run-off will be treated in the Baker Tank prior to leaving the site. Other pollutant
control guidelines include:
• Pollutants, including waste materials and demolition debris, that occur on site during construction
shall be handled and disposed of in a manner that does not cause contamination of surface water.
• Maintenance and repair of heavy equipment and vehicles involving oil changes, hydraulic system
drain down, solvent and de-greasing cleaning operations, fuel tank drain down and removal, and
other activities which may result in discharge or spillage of pollutants to the ground or into surface
water runoff must be conducted using spill prevention measures, such as drip pons. Contaminated
surfaces sholl be cleaned immediately following any discharge or incident. Emergency repairs may
be performed on-site using temporary plastic placed beneath and, if raining, over the vehicle.
• Wheel wash or tire bath wastewater and runoff from areas with fertilizer shall be discharged to a
separated on-site treatment system.
• Soil stabilization polymers, water treatment chemicals, and paints shall be discharged to a
separated on-site collection system.
• Concrete washout basins shall be used to prevent cement-laden runoff and/or wastewater from
leaving the site.
• BMPs shall be used to prevent or treat contamination of surface water runoff by pH modifying
sources. These sources include bulk cement, cement kiln dust, fly ash, new concrete washing and
curing waters, waste streams generated from concrete grinding and sawing, exposed aggregate
processes, and concrete pumping and mixer washout waters.
SPill RESPONSE
The primary objective in responding to a spill is to quickly contain the material(s) and prevent ar
minimize their migration into storm water runoff and conveyance systems. If the release has impacted
on-site stormwater, the released materials on site shall be contained, preventing their release into
receiving waters.
If a spill of pollutants threatens stormwater at the site, the spill response procedures outlined below must
be implemented in a timely manner to prevent the release of pollutants.
• The ESC supervisor will be notified immediately when a spill, or the threat of a spill, is observed.
The ESC supervisor will assess the situation and determine the apprapriate response.
• If spills represent an imminent threat of escaping ESC facilities and entering the receiving waters,
facility personnel will respond immediately to contain the release and notify the superintendent after
the situation has been stabilized.
Conceptual Stormwater Pollution Prevention and Spill Plan
Renton Aerospace Training Center, Renton, Washington
MAGNUSSON
KLEMENCIC
• Spill kits containing materials and equipment for spill response and cleanup will be maintained at
the site. Each spill kit may contain:
Oil absorbent pads (one bale)
Oil absorbent boams (40 feet)
55 gallon drums (2)
9 mil plastic bags (10)
Personal protective equipment including gloves and goggles
• The ESC supervisor, or his designee, will be responsible for completing the spill reporting form and
for reporting the spill to the appropriate state or local agency.
• Facility personnel with primary responsibility for spill response and cleanup will receive training from
the ESC supervisor. This training will include identifying the location of spill kits and other spill
response equipment and the use of spill response materials.
• Spill response equipment will be inspected and maintained as necessary to replace any materials
used in spill response activities.
DEWATERING
Dewatering will be performed on an as needed basis. Stormwater shall be diverted through the Baker
Tank prior to discharge.
BMP MAINTENANCE
Maintenance of erosion control and pollution prevention BMPs will be on a continuing basis throughout
the construction process. The applicant understands that the use of additional BMPs may be required
based on soil conditions, precipitation, and construction activities.
• Temporary and permanent erosion and sediment control BMPs shall be maintained and repaired as
needed to assure continued performance of their intended function. Maintenance and repair shall
be conducted in accordance with the BMPs.
• Sediment control BMPs shall be inspected weekly or alter a runoff-producing storm event during the
dry season and daily during the wet season. The inspection frequency for stabilized, inactive sites
shall be determined by the City based on the level of soil stability and potential for adverse
environmental impacts.
• Temporary erosion and sediment control BMPs shall be removed within 30 days alter final site
stabilization is achieved or alter the temporary BMPs are no longer needed. Trapped sediment shall
be removed or stabilized on site. Disturbed soil resulting from removal of BMPs or vegetation shall
be permanently stabilized.
PROJECT MANAGEMENT
A copy of the approved plans and this report will be on site at all times during construction. Seasonal
work limitations as determined by the City shall be adhered to.
Conceptual Stormwoter Pollution Prevention and Spill Plan
Renton Aerospace Training Center, Renton, Washington
•
MAGNUSSON
KLEMENCIC , .
• Inspection and Monitoring: BMPs shall be inspected, maintained, and repaired as needed to
assure continued performance of their intended function.
• Reporting: Report spillage or discharge of pollutants within 24 hours.
• Maintenance: Maintenance and repair of heavy equipment and vehicles involving oil changes,
hydraulic system drain down, solvent and degreasing cleaning operations, fuel tank drain down and
removal, and other activities which may result in discharge or spillage of pollutants to the graund or
into surface water runoff must be conducted using spill prevention measures, such as drip pans.
Contaminated surfaces shall be cleaned immediately following any discharge or incident.
Emergency repairs may be performed on-site using temporary plastic placed beneath and, if
raining, over the vehicle.
SECTION 9· POTENTIAl CONSTRIJCTION PHASING AND SCHEDLJI E
A potential construction sequence is:
• Attend pre-construction conference with City of Renton and utility representatives prior to starting
any work.
• Flag all clearing and demolition limits.
• Install catch basin protecflon and sedimentation barriers in locations as shown on the TESC plans.
• Install temporary construction entrance and wheel wash area.
• Clear and grub all areas as shown on the site demolition plans.
• Remove and dispose of asphalt concrete pavement, cement concrete sidewalk and curbing in areas
shawn an demolition plan. Do not remove any asphalt concrete pavement or cement concrete
pavement until an erasion control plan has been approved.
• Remove and dispose existing building and foundation as shown in demolition plan.
• Install shoring and excavate for new building.
• Install storm drainage and sanitary sewer systems.
• Install inlet pratection as catch basins are installed.
• Install water system and dry utilities services as shown on plans. Coordinate work with City of Renton
and utility representatives.
• Fine grade and install crushed surfaCing top course.
• Install cement concrete pavement, curbing, walks, and cement concrete walls as shown on plans.
• Landscape, hydraseed, and install amenities per landscape plans.
Conceptual Stormwater Pollution Prevention and Spill Plan
Renton Aerospace Training Center, Renton, Washington
• Erosion control facilities sholl remain in place until the site soils have been stabilized.
• Remove all sediment from drainage structures and pipes.
MAGNUSSON
KLEM[NCIC
• Contractor to remove catch basin protection and other TESC facilities only as directed by the owner
at substantial completion of the project.
• Contractor shall repair and/or restore landscape and/or site features after removal of the TESC
facilities.
Conceptual Stormwater Pollution Prevention and Spill Plan
Renton Aerospace Training Center, Renton, Washington
•
Site Improvement Bond Quantity Worksheet S15 Web date: 021221201,
tQ King County
Department of Permitting &. Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266
206-296-6600 TTY Relay 711
Project Name: Renton AerosP<ice Training Project
Location: 300 Rainier Avenue North, Renton, WA
Clearing greater than or equal to 5.000 board feet of timber?
yes
If yes.
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
x no
For alternate formats, call 206-296-6600.
Date: 7/27/15
Project No.:
Activity No.:
Note: All prices include labor, equipment, materials. overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
Figure IX-1: Bond Quantities Worksheet
Bond Quantities Worksheet.xlsx
Unit prices updated: 02/12102
Version: 11/2612008
Report Date: 7124/2015
Site Improvement Bond Quantity Worksheet S15 Web date: 02/22/201,
Reference ,
EROSION/SEDIMENT CONTROL Number
Backfill & compaction-embankment ESC-l
Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3
Crushed surfacing 1 114" minus ESC-3 WSDOT 9-03.9(3)
Ditching ESC-4
Excavation-bulk ESC-S
Fence, silt ESC-6 SWDM 5.4.3.1
Fence, Temporary (NGPE) ESC-7
Hydroseeding ESC-8 SWDM 5.4.2.4
Jute Mesh ESC-9 SWDM 5.4.2.2
Mulch, by hand, straw, 3" deep ESC-l0 SWDM 5.4.2.1
Mulch, by machine, straw, 2" deep ESC-11 SWDM 5.4.2.1
Piping, temporary, CPP, 6" ESC-12
Piping, temporary, CPP, 8" ESC-13
Piping, temporary, CPP, 12" ESC-14
Plastic covering, 6mm thick, sandbagged ESC-1S SWDM 5.4.2.3
Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2)
Rock Construction Entrance, 50'x15'xl' ESC-17 SWDM 5.4.4.1
Rock Construction Entrance, 100'x15'xl' ESC-iS SWDM 5.4.4.1
Sediment pond riser assembly ESC-19 SWDM 5.4.5.2
Sediment trap, 5' high berm ESC-20 SWDM 5.4.5.1
Sed. trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1
Seeding, by hand ESC-22 SWDM 5.4.2.4
Sodding, 1" deep, level ground ESC-23 SWDM 5.4.2.5
Sodding, 1" deep, sloped ground ESC-24 SWDM 5.4.2.5
TESC Supervisor ESC-2S
Water truck, dust control ESC-26 SWDM 5.4.7
WRITE-IN-ITEMS -(see oaae 9)
CB Insert
Baker Tank
Sedimentation Barrier --
Page 2 019
Bond Quantities Worksheet.xlsx
Unit
Price Unit Quantity
$ 5.62 CY 95
$ 67.51 Each
$ 85.45 CY
$ 8.08 CY
$ 1.50 CY
$ 1.38 LF
$ 1.38 LF
$ 0.59 SY
$ 1.45 SY
$ 2.01 SY
$ 0.53 SY
$ 10.70 LF
$ 16.10 LF
$ 20.70 LF
$ 2.30 SY 3
$ 39.08 CY
$ 1,464.34 Each
$ 2,928.68 Each 1
$ 1,949.38 Each
$ 17.91 LF
$ 68.54 LF
$ 0.51 SY
$ 6.03 SY
$ 7.45 SY
$ 74.75 HR 104
$ 97.75 HR
$ 300.00 Each 7
$ 50.00 1
$ 300.00 1
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
"of
Applications Cost
1 534
1 7
1 2929
1 7774
1 2100
210 10500
1 300
--
$ 24,143.48
$ 7,243.04
$ 31,386.52
A
Unit prices updated: 02/12102
Version: 11/2612008
Report Date; 712412015
•
,"-' .'.
GENERAL ITEMS No.
Backfill & Compaction-embankment GI· t
Backfill & Compaction-trench GI· 2
Clear/Remove Brush, by hand GI· 3
Clearing/GrubbingfTree Removal GI· 4
Excavation -bulk GI· 5
Excavation -Trench GI·6
Fencing, cedar, 6' high GI· 7
Fencing, chain link, vinyl coaled, 6' higl GI·8
Fencing, chain link, gate, vinyl coated, GI· 9
Fencing, split rail. 3' high GI·1C
Fill & compact -common barrow GI·11
Fill & comDact -aravel base GI·12
Fill & compact· screened topsoil GI·l
Gabion, 12" deep, stone filled mesh GI·14
Gabion, 18" deep, stone filled mesh GI·l
Gabion, 36" deep. stone filled mesh GI·1!
Grading, fine, by hand GI·l
Grading, fine, with grader GI·l
Monuments, 3' long GI·l
Sensitive Areas SiQn GI· 2(
Sodding, 1" deep, sloped ground GI· 21
Surveying, line & grade GI·22
Surveying, 101 location/lines GI·2
Traffic control crew ( 2 flaggers ) GI·2
Trail, 4" chiDDed wood GI·2
Trail, 4" crushed cinder GI· 26
Trail, 4" top course GI·27
Wall, retaininQ, concrete GI·28
Wall, rockery GI·29
Page 3 of 9
*KCC 27 A authorizes only one bond reduction.
Bond Quantities Worksheet.xlsx
Site I mprovement Bond Quantity Worksheet Web date: 12/02/2008
Existing
Rlght-of·Way
Unn Price Unit Quant. Cost
$ 5.62 CY 3 16.66
$ 8.53 CY 46 392.38
$ 0.36 SY
$ 8,876.16 Acre 0.06 532.57
$ 1.50 CY 82 123.00
$ 4.06 CY 16 64.96
$ 18.55 LF
$ 13.44 LF
$ 1,271.81 Each
$ 12.12 LF
$ 22.57 CY
$ 25.48 CY 14 356.72
$ 37.85 CY 64 2,422.40
$ 54.31 SY
$ 74.85 SY
$ 132.48 SY
$ 2.02 SY 97 195.94
$ 0.95 SY 199 189.05
$ 135.13 Each
$ 2.88 Each
$ 7.46 SY
$ 788.26 Day 3 2,364.78
$ 1,556.64 Acre
$ 85.18 HR
$ 7.59 SY
$ 8.33 SY
$ 8.19 SY
$ 44.16 SF
$ 9.49 SF
SUBTOTAL 6,658.66
Future Public
Right of Way
& Drainage Facilities
Quant. Cosl
Private Quantity Completed
Improvements (Bond Reduction)'
Quanl.
1962
40
0.5
6450
30
40
3
250
67
100
2029
210
Quanl.
Cost CompletE Cost
11,026.44
341.20
4,438.08
9,675.00
121.80
537.60
3,815.43
6,370.00
2,535.95
202.00
1,927.55
9,273.60
50,264.65
Unit prices updatec: 02112102
Version: 11/26/08
Report Date: 712412015 •
I
ROAD IMPROVEMENT No.
AC Grinding, 4' wide machine < 1000s~ RI· 1
AC Gr'mding, 4' wide machine 1000-200 RI-2
AC Grinding, 4' wide machine> 2000sy RI-3
AC Removal/Disposal/Repair RI· 4
Barricade, type I RI-5
Barricade, tyEe III ( Permanent) RI· 6
Curb & Gutter, rolled RI-7
Curb & Gutter, vertical RI-8
Curb and Gutter, demolition and dispos IRI-9
Curb, extruded asphalt RI-10
Curb, extruded concrete RI • 11
Sawcut, asphan, 3" depth RI-12
Sawcut, concrete, per 1" depth RI· 13
Sealant, asphalt RI-14
Shoulder, AC, j see AC road unit price RI· 15
Shoulder, gravel, 4" thick RI-16
Sidewalk, 4" thick RI· 17
Sidewalk, 4" thick, demolition and dispo~RI-18
Sidewalk, 5" thick RI-19
Sidewalk, 5" thick, demolition and dispo RI· 20
Sign, handicap RI-21
Striping, per stall RI-22
StripinQ, thermoplastic, (for crosswalk) RI-23
Striping, 4" reflectorized line RI-24
Page 4 of 9
*KGG 27A authorizes only one bond reduction.
Bond Quantities Worksheet.xlsx
Site Improvement Bond Quantity Worksheet Web date: 12/02/2008
Existing
Right-of-way
Unit Price Unit Quant. I Cost
$ 28.00 SY
$ 15.00 SY
$ 7.00 SY
$ 67.50 SY 284 19,170.00
$ 30.03 LF
$ 45.05 LF
$ 17.00 LF
$ 12.50 LF
$ 18.00 LF 8 144.00
$ 5.50 LF
$ 7.00 LF 8 56.00
$ 1.85 LF 234 432.90
$ 1.69 LF 64 108.16
$ 1.25 LF
$ . SY
$ 15.00 SY
$ 35.00 SY 18 630.00
$ 29.50 SY 12 364.00
$ 38.50 SY
$ 37.50 SY
$ 85.28 Each
$ 5.82 Each
$ 2.38 SF
$ 0.25 LF
SUBTOTAL 20,895.06
Future Public
Right of Way
& Drainago Facilitle.
Quant. I Cost
Private Bond Reduction*'
Improvements
Quant. I
42
298
165
272
221
38
232
9
155
Quant.
Cost Complet Cost
2,835.00
5,364.00
1,155.00
503.20
7,735.00
1,121.00
8,932.00
52.38
38.75
27,736.33
Unit prices updated: 02112/02
Version: 11/26/08
Report Date: 712412015
•
Site Improvement Bond Quantity Worksheet Web date: 12/02/2008
Unit Price Unit
ROAD SURFACING (4" Rock = 2.5 base & 1.5" top course)
For KCRS '93, (additional 2.5" basel ad RS -1
AC Overlav, 1.5" AC RS-2
AC Overlay, 2" AC RS-3
AC Road, 2", 4" rock, First 2500 SY RS-4
AC Road. 2", 4" rock, Qty. over 2500SY RS-5
AC Road, 3", 4" rock, First 2500 SY RS-6
AC Road, 3", 4" rock, Qty. over 2500 S RS-7
AC Road, 5", First 2500 SY RS-8
AC Road, 5", Qty. Over 2500 SY RS-9
AC Road, 6", First 2500 SY RS -1
AC Road, 6", Qtv. Over 2500 SY ~S -1
Asphalt Treated Base, 4" thick RS -1
Gravel Road, 4" rock, First 2500 SY RS -1
Gravel Road, 4" rock, Qty. over 2500 S RS -1
PCC Road, 5", no base, over 2500 SY RS - 1
pee Road, 6", no base, over 2500 SY RS - 1
Thickened Edoe . RS - 1
Page 5 of9
*KCC 27A authorizes only one bond reduction.
Bond Quantities Worksheet.xlsx
$ 3.60 SY
$ 11.25 SY
$ 15.00 SY
$ 21.00 SY
$ 19.00 SY
$ 23.30 SY
$ 21.00 SY
$ 27.60 SY
$ 25.00 SY
$ 33.10 SY
$ 30.00 SY
$ 20.00 SY
$ 15.00 SY
$ 8.50 SY
$ 27.00 SY
$ 25.50 SY
$ 8.60 LF
SUBTOTAL
Existing Future Public
Right-of-way Right of Way
& Drainage FaclllUos
Quant. I Cost Quant. I Cost
For '93 KCRS ( 6.5" Rock-5" base & 1.5" top course)
57 1,328.10
1,328.10
Private Bond Reduction·
Improvements
Quant. I
113
Cost
Quant~J
Complet Cost
2,632.90
-
2,632.90
Unit prices updated: 02112102
Version: 11126108
Report Date: 7/2412015 •
Site Improvement Bond Quantity Worksheet Web dale: 12/0212008
I Unit Price Unit
DRAINAGE (CPP -Corrugated Plastic Pipe, N12 or Equivalent)
Access Road, RID 0-1
Sellards -fixed 0-2
Sollards -removable 0-3
• (CBs include frame and lid)
CB Type I 0-4
CB Type IL 0-5
CB TYoe II, 48" diameter 0-6
for additional depth over 4' 0-7
CB Type II, 54" diameter 0-8
for additional depth over 4' 0-9
CB Tvpe II, 60" diameter 0-10
for additional depth over 4' 0-11
CB Type II, 72" diameter 0-12
for additional depth over 4' 0-13
Throuah-curb Inlet Framework (Add) 0-14
Cleanout, PVC, 4" 0-15
Cleanout, PVC, 6" 0-16
Cleanout, PVC, 8" 0-17
Culvert, PVC, 4" 0-18
Culvert, PVC, 6" 0-19
Culvert, PVC, 8" 0-20
Culvert, PVC, 12" 0-21
Culvert, CMP, 8" 0-22
Culvert, CMP, 12" 0-23
Culvert, CMP, 15" 0-24
Culvert, CMP, 18" 0-25
Culvert, CMP, 24" 0-26
Culvert, CMP, 30" 0-27
Culvert, CMP, 36" 0-28
Culvert, CMP, 48" 0-29
Culvert, CMP, 60" 0-30
Culvert, CMP, 72" 0-31
Page 6 of 9
*KCC 27A authorizes only one bond reduction.
Bond Quantities Worksheet.xlsx
$ 21.00 SY
$ 240.74 Each
$ 452.34 Each
$ 1,257.64 Each
$ 1,433.59 Each
$ 2,033.57 Each
$ 436.52 FT
$ 2,192.54 Each
$ 486.53 FT
$ 2,351.52 Each
$ 536.54 FT
$ 3,212.64 Each
$ 692.21 FT
$ 366.09 Each
$ 130.55 Each
$ 174.90 Each
$ 224.19 Each
$ 8.64 LF
$ 12.60 LF
$ 13.33 LF
$ 21.77 LF
$ 17.25 LF
$ 26.45 LF
$ 32.73 LF
$ 37.74 LF
$ 53.33 LF
$ 71.45 LF
$ 112.11 LF
$ 140.83 LF
$ 235.45 LF
$ 302.58 LF
SUBTOTAL
Quant.
Existing Future Public Private Bond Reduction'"
Right-of .... y Right of Way Improvements
& Drainage Facilities Quant.
Cost QuantI Cost Quant. I Cost Co'!!E!et Cost
For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as soliC!p!p.e.
9
1
8
6
_. ~
2,166.66
1,257.64
1,044.40
1,049.40
--
5,518.10
Unit prices updated: 02/12/02
Version: 11/26/08
Report Date: 712412015
•
DRAINAGE CONTINUED
No.
Culvert, Concrete, 8" D -32
Culvert, Concrete, 12" 0-33
Culvert, Concrete, 15" D -34
Culvert, Concrete, 18" 0-35
Culvert, Concrete, 24" 0-36
Culvert, Concrete, 30" 0-37
Culvert, Concrete, 36" 0-38
Culvert, Concrete, 42" 0-39
Culvert, Concrete, 48" 0-40
Culvert, CPP, 6" 0-41
Culvert, CPP, 8" 0-42
Culvert, CPP, 1Z' 0-43
Culvert, CPP, 15" 0-44
Culvert, CPP, 18" 0-45
Culvert, CPP, 24" 0-46
Culvert, CPP, 30" 0-47
Culvert, CPP, 36" 0-48
Ditching 0-49
Flow OisDersal Trench (1,436 base+L 0-50
French Drain (3' depth) 0-51
Geotextile, laid in trench, polypropylene 0-52
I nfiltration pond testing 0-53
Mid-tank Access Riser, 48" dia, 6' deel) 0-54
Pond Overflow Spillway 0-55
RestrictorlOil Separator, 12" 0-56
Restrictor/Oil Separator, 15" D -57
Restrictor/Oil Separator, 18" D -58
RiDraD, olaced D -59
Tank End Reducer (36" diameter) D-60
Trash Rack, 12" D -61
Trash Rack, 15" D-62
Trash Rack, 18" D-63
Trash Rack, 21" D-64
Page 7 019
""KeG 27 A authorizes only one bond reduction.
Bond Quantities Worksheet.xlsx
Site Improvement Bond Quantity Worksheet
Existing Future Public Private
Right-of-way Right of Way Improvements
& Drainage Facilities
Unit Price Unit Quant. Cost Quant Cost Quant Cost
$ 21.02 LF
$ 30.05 LF
$ 37.34 LF
$ 44.51 LF
$ 61.07 LF
$ 104.18 LF
$ 137.63 LF
$ 158.42 LF
$ 175.94 LF
$ 10.70 LF
$ 16.10 LF
$ 20.70 LF
$ 23.00 LF
$ 27.60 LF
$ 36.80 LF
$ 48.30 LF
$ 55.20 LF
$ 8.08 CY
$ 25.99 LF
$ 22.60 LF
$ 2.40 SY
$ 74.75 HR
$ 1,605.40 Each
$ 14.01 SY
$ 1,045.19 Each
$ 1,095.56 Each
$ 1,146.16 Each
$ 39.08 CY
$ 1,000.50 Each
$ 211.97 Each
$ 237.27 Each
$ 268.89 Each
$ 306.84 Each
SUBTOTAL
IJVeb date: 1210212008
Bond Reduction·
I ,
Quant.
ComDlot. Cost
Unit prices updated: 02112102
Version: 11126108
Report Date: 712412015 •
Site Improvement Bond Quantity Worksheet Web date: 12/02/2008
I Unit Price Unit
PARKING LOT SURFACING
No.
2" AC, 2" top course rock & 4" borrow PL -1 $ 21.00 SY
2" AC, 1.5" top course & 2.5" base cou PL-2 $ 28.00 SY
4" select borrow PL-3 $ 4.55 SY
1.5" too course rock & 2.5" base course PL-4 $ 11.41 SY
UTILITY POLES & STREET LIGHTING
Utilitv Pole(s) Relocation UP-1 I Lump Sum
Street Light Poles w/Luminaires J. UP-2 Each
WRITE-IN-ITEMS
I(Such as detention/water quality vaults. No.
Area Drain WI-1 $ 500.00 Each
WI-2 SY
WI-3 CY
WI-4 LF
WI-5 FT
Bollards (Flexible) WI-6 $ 300.00 Each
WI-7
WI-8
WI-9
WI-1D
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):
30% CONTINGENCY & MOBILIZATION:
Page 8 of 9
"'Kec 27A authorizes only one bond reduction.
Bond Quantities Worksheet.xlsx
GRANDTOTAL:
COLUMN:
I
Existing Future Public Private Bond Reduction·
Right-of-way Right of Way Improvements
& Drainage Facilities Quant.
Quant. I Price Quant. I Cost Quant.~ Cost Co~et Cost
Utility pole relocation costs must be accompanied !;£ranchise Utility's Cost Statement
I I I I
J.
1
5
28,881.82
8,664.55
37,546.37
B C
I
I
I
500.00
1,500.00
2.000.00
88,151.98
26,445.59
114,597.57
0 E
Unit prices updated: 02112102
Version: 11126108
Report Date: 712412015
•
Site Improvement Bond Quantity Worksheet Web date: 12/0212008
Original bond computations prepared by:
Name: Steven D Haluschak Date: 27 -Jul
PE Registration Number: 29564 Tel. #: 206.292.1200
Firm Name: Magnusson Klemencic Associates
Address: 1301 5th Ave Seattle, WA 98101 Project No:
ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS
Stabilization/Erosion Sediment Control (ESC)
Existing Right-of-Way Improvements
Future Public Right of Way & Drainage Facilities
Private Improvements
Calculated Quantity Completed
Total Right-of Way and/or Site Restoration Bond'r'
(First $7,500 of bond' shall be cash.
Performance Bond' Amount (A+B+C+D) = TOTAL
Reduced Performance Bond' Total '"
Maintenance/Defect Bond' Total
NAME OF PERSON PREPARING BOND' REDUCTION:
(A)
(B)
(C)
(D)
(A+B)
(T)
PERFORMANCE BOND'
AMOUNT BOND' AMOUNT
REQUIRED AT RECORDING OR
$ 31,386.5 TEMPORARY OCCUPANCY'"
-..1 37,546.4
$
$ 114,597.6
(E) $
$ 68,932.9
$ 183,530.5 IT x 0.30 $ 55,059.1
MInimum bOnd; amount IS $2000
(T-E) $ 183,530.5
Use larger of TX30% or (T -E
* NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County.
** NOTE: KeG 27 A authorizes right of way and site restoration bonds to be combined when both are required.
PUBLIC ROAD & DRAINAGE
MAINTENANCE/DEFECT BOND'
OR
(B+C) x
0.25 = $ 9,386.6
Date:
The restoration requirement shall include the total cost for all lESe as a minimum, not a maximum. In addition, corrective work, both on-and off-site needs to be included.
Quantities shan reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity .
... NOTE: Per Kee 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
I I
REQUIRED BOND' AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY DDES
Page 9 of9
Check out the DDES Web site at www.kingcountv.govlpermits
Unit prices updated 02112/02
Version: 11/26/08
Report Date: 7/24/2015 Bond Quantities Worksheet.xlsx •
• APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO.5 -CATCH BASINS AND MANHOLES
Maintenance Defect or Problem Condition When Maintenance Is Needed Results Expected When
Component Maintenance is Performed
Structure Sediment Sediment exceeds 60% of the depth from the Sump of catch basin contains no
bottom of the catch basin to the invert of the sediment.
lowest pipe into or out of the catch basin or is
within 6 inches of the invert of the lowest pipe
into or out of the catch basin.
Trash and debris Trash or debris of more than % cubic foot which No Trash or debris blocking or
Is located immediately in front of the catch basin potentially blocking entrance to
opening or is blocking capacity of the catch basin catch basin.
by more than 10%.
Trash or debris in the catch basin that exceeds No trash or debris in the catch basin.
1/3 the depth from the bottom of basin to invert the
lowest pipe into or out of the basin.
Dead animals or vegetation that could generate No dead animals or vegetation
odors that could cause complaints or dangerous present within catch basin.
gases (e.g" methane).
Deposits of garbage exceeding 1 cubic foot in No conditian present which would
volume. attract or support tlle breeding af
insects ar rodents.
Damage ta frame Corner of frame extends more than % inch past Frame is even with curb.
and/or top slab curb face into the street (If applicable).
Top slab has holes larger than 2 square inches or Top slab is free of holes and cracks.
cracks wider than 1,4 inch.
Frame not sitting flush on top slab, i.e., Frame is sitting flush on top slab.
separation of more than % inch of the frame from
the top slab.
Cracks in walls or Cracks wider than 112 inch and longer than 3 feet, Catch basin is sealed and
bottom any evidence of sail particles entering catch structurally sound.
basin through cracks, or maintenance person
judges that catch basin is unsound.
Cracks wider than % inch and longer than 1 foot No cracks more than 1/~ inch wide at
at the joint of any inlet/outlet pipe or any evidence the joint of inlet/outlet pipe.
of soil particles entering catch basin through
cracks.
Settlementl Catch basin has settled more than 1 inch or has Basin replaced or repaired to d~sign
misalignment rotated more than 2 inches out of alignment. standards.
Damaged pipe joints Cracks wider than %-inch at the joint of the No cracks more than %-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of inletloutlet pipes.
the catch basin at the joint of the inlet/outlet
pipes.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Inlet/QuUet Pipe Sediment Sediment filling 20% or more of the pipe. Inlet/outtet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged Cracks wider than !4-inch at the joint of the No cracks more than 1.4-inch wide at
inlet/outlet pipes or any evidence of soil entering Ihe Joint of Ihe Inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
Figure X-1a: Catch Basins and Manholes Maintenance Checklist
2009 Surface Water Design Manual-Appendix A 119/2009
A-9
•
NO.5 -CATCH BASINS AND MANHOLES
Maintenance Defect or Problem Condition When Maintenance Is Needed Results Expected When
Component Maintenance Is Perfonned
Metal Grates Unsafe grate opening Grate with opening wider than 1/a inch. Grate opening meets design
(Catch Basins) standards.
Trash and debris Trash and debris that is blocking more than 20% Grate free of trash and debris.
of grate surface. footnote to guidelines for disposal
Damaged or missing Grate missing or broken member(s) of the grate. Grate is in place and meets design
Any open structure requires urgent standards.
maintenance.
Manhole Cover/lid Cover/lid not in place Covernld Is missing or only partially In place. Covernld protects opening to
Any open structure requires urgent structure.
maintenance.
locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
Not Working maintenance person with proper tools. Bolts
cannot be seated. Self-locking oover/lid does not
work.
Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and
Remove oover/lid after applying 80 Ibs. of lift. reinstalled by one maintenance
person.
119/2009 2009 Surface Water Design Manual-Appendix A
A-IO
• APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO.6 -CONVEYANCE PIPES AND DITCHES
Maintenance Defect or Problem Conditions When Maintenance Is Needed Results Expected When
Component Maintenance is Performed
Pipes Sediment & debris Accumulated sediment or debris that exceeds Water flows freely through pipes.
accumulation 20% of the diameter of the pipe.
Vegetation/roots Vegetation/roots that reduce free movement of Water flows freely through pipes.
water through pipes.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a 5ulface oil film.
Damage to protective Protective coating is damaged; rust or corrosion Pipe repaired or replaced.
coating or corrosion is weakening the structural integrity of any part of
pipe.
Damaged Any dent that decreases the cross section area of Pipe repaired or replaced.
pipe by more than 20% or is detennined to have
weakened structural integrity of the pipe.
Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 Trash and debris cleared from
square feet of ditch and slopes. ditches.
Sediment Accumulated sediment that exceeds 20% of the Ditch deaned/flushed of all sediment
accumulation design depth. and debris so that it matches design.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might nonnally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Vegetation Vegetation that reduces free movement of water Water flows freely through ditches.
through dhches.
Erosion damage to Any erosion observed on a ditch slope. Slopes are not eroding.
slopes
Rock lining out of One layer or less of rock exists above native soil Replace rocks to design standards.
place or missing (If area 5 square feet or more, any exposed native
Applicable) soil.
Figure X-1 b: Conveyance Pipes and Ditches Maintenance Checklist
2009 Surface Water Design Manual-Appendix A 119/2009
A·Il