Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutMiscspringline design LLC
Civil Engineering I Site Development I Transportallon
3131 Western Avenue. Suite 501
Seattle, Washmgton 98121
ph 206 957.8311 fax 206.957.8313
TECHNICAL INFORMATION REPORT
Project:
Prepared For:
Prepared By:
Reviewed By:
Date:
Limelite Short Plat
11419 SE 162 nd Street
Renton, WA 98055
Limelite Development
14508 NE 20th St. #200
Seattle, WA 98007
Chris Puma
Peter Apostol, PE
July 7, 2014
AUG 1 2 ZU
TABLE OF CONTENTS
Section No. Subject Page No.
SECTION I PROJECT OVERVIEW .................................................................... 2
SECTION II CONDITIONS AND REQUIREMENTS SUMMARY ................... II
SECTION III OFFSITE ANALYSIS ...................................................................... 13
SECTION IV FLOW CONTROL AND WATER QUALITY
FACILITY ANALYSIS AND DESIGN .......................................... 27
SECTION V CONVEYANCE SYSTEM ANALYSIS AND DESIGN ................ 30
SECTION VI SPECIAL REPORTS AND STUDIES ............................................. 30
SECTION VII OTHER PERMITS ........................................................................... 30
SECTION Vlll EROSION AND SEDIMENT CONTROL.. ..................................... 30
SECTION IX BOND QUANTITIES AND
DECLARATION OF COVENANTS ............................................... 31
SECTION X OPERATIONS AND MAINTENANCE MANUAL ....................... 31
LIST OF FIGURES
FIGURE I VICINITY MAP ................................................................................ .4
FIGURE 2
FIGURE 3
FIGURE 4
FIGURE 5
FIGURE 6
FIGURE 7
FIGURE 8
TIR WORKSHEET ............................................................................ 5
EXISTING SITE SOILS ..................................................................... 8
EXISTING CONDITIONS ................................................................. 9
DEVELOPED CONDITIONS .......................................................... 10
DOWNSTREAM FLOWPA TH ....................................................... 25
DOWNSTREAM LIMIT OF THE OFFSITE ANALYSIS ............ .28
FLOW CONTROL BMP'S ............................................................. .29
LIST OF APPENDICIES
APPENDIX A CIVIL PLANS
APPENDIX B KCRTS DETENTION TANK CALCULATIONS
APPENDIX C 114th AVE SE CONVEYANCE CALCULATIONS
APPENDIX D BOND QUANTITY CALCULATION
APPENDIX E DECLARATION OF COVENANTS
APPENDIX F OPERATION AND MAINTENANCE MANUAL
APPENDIX G GEOTECHNICAL REPORT
Limelitt:: Short Plat
11419SE 162nd SLreet
Page 1 Project No. 14011
Springline Design LLC
SECTION I -PROJECT OVERVIEW
General Description:
This project is located at 11419 SE 162nd Street on the southeast comer of I 14th Ave SE
and SE 162nd Street. See Figure I Vicinity Map. The existing 0.687 acre site will be
short platted into a 5-lot subdivision. The proposed lots are intended for the development
of detached single family homes. The existing residence and detached garage are
proposed to be removed prior to the recording of the short plat. Access to proposed Lots
1 and 2 would be gain from private driveways extended from SE 162 nd Street. Proposed
Lots 3 and 4 will take access from 114th Ave SE via private driveways. Proposed Lot 5
would take access via an access easement extended across proposed Lot 4.
Site improvements will include grading, flow control BMP's, stormwater facilities, utility
connections and landscaping. Frontage improvements will be constructed along 114th
Ave SE and SE 162 nd Street and include new sidewalks, curb and gutter and planter
areas. A storm drain extension is required in I 14th Ave SE to extend to our site. A
sanitary sewer main extension is required in SE 162 nd St.
The proposed project has been designed to meet the requirements of the 2010 City of
Renton Amendment to the 2009 King County Surface Water Design Manual (KCSWD).
A summary of the project data is provided in the TIR worksheet (see Figure 2).
Site Soils
The NRCS map (see Figure 3) of the site shows the presence Alderwood soils located
within the project area. See Appendix G for the Geotechnical Report.
Predeveloped Conditions:
An existing single story residence with a detached garage is located at the center of the
property. Gravel driveway access is provided from both SE 162 nd Street and I 14th Ave.
The remainder to the site consists oflawn with trees located along both streets. On-site
grades are less than 1%. Stormwater runoff drains overland to an existing ditch in the
right-of-way which runs along 162 nd Street and I 14th Ave SE. The existing roadways are
both crowned along the centerline and flow into the aforementioned ditch. Roadway
slopes range from I % to 6%.
The limits of work are located within one Threshold Discharge Area which is defined by
the City of Renton Amendment to the KCSWD as; "an onsite area draining to a single
natural discharge location, or multiple natural discharge locations that combine within
one-quarter -mile downstream ". Threshold Discharge Area # I (TDA # 1) includes the
on-site project area and the frontage improvements within the right-of-way.
The existing land cover for the site and frontage improvements is shown in Figure 4
which follows this section. The downstream flow path is described in the offsite analysis
in Section III.
Limelite Short Plat
114t9 SE 162nd Street
Page 2 Project No. 14011
Springline Design LLC
Developed Conditions:
The existing site will be short platted into a 5-10t subdivision with each lot containing a
single-family home. Proposed improvements for each lot will include new driveways,
concrete walkways, drainage improvements, landscaping and site grading. Frontage
improvements of the adjacent right-of-way will include construction of new curb and
gutter, sidewalk, planting strip, driveway and drainage improvements. The anticipated
lot coverage for the developed condition is included as Figure 5 which follows this
section.
The existing site topography will not be dramatically altered in the proposed condition.
Stormwater will be discharged from the site within the same TDA.
Limelite Short Plat
11419 SE 162 00 Street
Page 3 Project No. 14011
Springline Design IJ,C
IVcLercofl Hardware .':l
..,. SOLnc Ford
~ ~..-iiif. ;-0-" -4'1--
1-.
(16/;
1
",
Younker Nis,san t':I "
Clarion ....
" .. ,\-,.
SW 41~tS!
GedarRi".:;jarlt. ..
(ill) /:
, Uelrgse Gnll
Project Site
11419SE 162 Nl'St
f-1enry Mosf"!:
• Aquatic Cf"rlf'r
@)
St>adowrawk
CondOIT'If'II .. ms
Sf petrQv,tskyRd
·-.)1
FIGURE I -VICINITY MAP
LimeliLe Short Plat
11419 SE 162nd Street
Page 4 Project No. 14011
Springline Design LLC
FIGURE 2
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER
Project Owner: Limelite Development
Address: 14508 NE 201h , WA 98056
Phone: 425-226-1850
Project Engineer: Peter Apostol, PE
Company: Springline Design, LLC
Address/Phone: 206 957 8311
Part 3 TYPE OF PERMIT
APPLICATION
Subdivison
0 Short Subdivision
0 Grading
D Commercial
D Other
Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Name: 11419 SE 162" Street
Location' 11419 SE 162" Street, Renton, WA
98055
Township
Range
Section
Part 4 OTHER REVIEWS AND PERMITS
D DFW HPA D Shoreline Management
D COE404 U Rockery
U DOE Dam Safety D Structural Vaults
n FEMA Floodplain D Other
[ COE Wetlands
Part 5 SITE COMMUNITY AND DRAINAGE BASIN
Community
Renton
Drainage Basin
Part 6 SITE CHARACTERISTICS
D River
D Stream
D Critical Stream Reach
n Depressions/Swales
U Lake
D Steep Slopes
Limelite Short Plat
11419SE 162nd Street
[
[
D
D
0
D
Page 5
Floodplain
Wetlands
Seeps/Springs
High Groundwater Table
Groundwater Recharge
Other
Project No. 14011
Springlinc Design LLC
Part 7 SOILS
Soil Type
Arents, Alderwood
Material
Slopes
6% to 15%
D Additional Sheets Attached
Part 8 DEVELOPMENT LIMITATIONS
D
D
D
D
D
D
REFERENCE
D Additional Sheets Attached
Part 9 ESC REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
• Sedimentation Facilities
• Stabilized Construction Entrance
• Perimeter Runoff Control
• Clearing and Grading Restrictions
• Cover Practices
• Construction Sequence
D Other
Limelite Short Plat
11419 SE 162 nd Street
Erosion Potential Erosive Velocities
Moderate
LIMITATION/SITE CONSTRAINT
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
• Stabilize Exposed Surface
• Remove and Restore Temporary ESC Facilities
• Clean and Remove All Silt and Debris
• Ensure Operation of Permanent Facilities
C Flag Limits of SAO and open space
preservation areas
[' Other
Page 6 Project No. 14011
Springiine Design LLC
Part 10 SURFACE WATER SYSTEM
] Grass lined • Tank [ Infiltration Method of Analysis
Channel D r-~~ Vault Depression • Pipe System n D Compe Mitigati Energy Dissipater Flow Dispersal on of Eliminated Site D Open Channel U Wetland ] Waiver Storage
U Dry Pond D Stream iJ Regional N/A
J Wet Pond Detention
Brief Description of System Operation: Piped conveyance to on-site detention tank.
Facility Related Site limitations
Reference Facility Limitation
Part 11 STRUCTURAL ANALYSIS Part 12 EASEMENTSfTRACTS
D Cast in Place Vault [ Drainage Easement
] Retaining Wall [ Access Easement
] Rockery> 4' High D Native Growth Protection Easement
D Structural on Steep Slope D Tract
iJ Other D Other
Part 13 SIGNATURE OF PROFESSIONAL ENGINEER
I or a civil engineer under my supervision my supervision have visited the site. Actual site
conditions as observed were incorporated into this worksheet and the attachments. To the best of
my knowledge the information provided here is accurate.
Limelite Short Plat
11419 SE 162 nd Street
~ ~
Sinned/Date
Page 7
07/07/2014
Project No. 14011
Springline Design LLC
FIGURE 3 -EXISTING SITE SOIL CONDITIONS
I ,imclite Short Plat
11419 SE 162"J Street
Page 8 Project No. 140 II
Springline Design LLC
WOO":)1I 9U !l 6updS"MMM
t~£:B L96 90l xeJ ~l:~86 "1M 'al:peas
~ ~t8 LS6 90l 4d ~OS 9~!ns 'anu9"" UJalSaM ~£:~£ ,0;:: -.~ 3-''<108
:Jll u51sap aU!l5u!Jds
SNOIlJaNOO ONI.lSIX3 -V 31::1nOI::::t
0
N
'0
N u z:
0 ':-0
w Z -' «: W u
(f) "
'::i 0
-' u
"-«: w "" :r: ~ 0 a.. ~ u
0 S2 w a:: 0:: 0:: u '-" III
0 W
N ...J
,-' ~ ~ " I ,-~ I
, 7 r--;----7---;---7--~-""7-~7-7-
0
0
0
~
(/)
S2 a::
'-" -en
W a: g
a:
W > ----r-~------4 0
7 7 7 7 "a
:10
: 7 7 7 7 7 7 7 7 7 . It...,--.;.,---,---,';"'.....,-....,.....'"n
7
7 'Iz
7 I. 7
• 7 7
7 I~ . ...J
7 '.
71 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
7 '/" 'z 7 '. I-7 7 'I en
7 7 Ix IW
7 7 ,.
7 7 1
7 7
7 7
7 7 '.
" 7 7
:/
7 7 71
7 7
I
7 7 I
7 , ;/. 7 7:1
• 7 7 •
7 7 71
7 7 I
7 7 71
7 7 I
I
7 7 1 7 7 I
7. 7 1 '7 7 7 I
7 ' 7 1 7 17 7
<7 7 J
"l
7 ' 7 7 1
7· 7 J
,I
!-.-~:
-' ,.... ,.... ...-;5 00 m 00 to N m :=' 6 6 6
(/) m 00 ,....
(/) N 00 ~ L(') 0 to
'-" 6 6 6
0 Ll) I L(')
0 N N
0 0 0
~ 6 6
"" <5 -u I 0
0:: 0 0
III 6 6
-' m to L(') W ~ CD CD I")
0 0 -
'-" 6 6 6
U z:
0 0 0 u <5 I 0
~ 6 6
w u
'::i I") I") «: I ...-...-:r: --a.. 6 6 S2
"-I") ,..,
0 L(') I L(')
0 0 0 a:: 6 6
w (/) -' C: >-;5 (/) z:
I w :=' z: :::;;
0 w > 0 a:: a..
~
w
'-" ;5 z:
0
0::
"-
,
/
ROW IMPROVEMENTS~
ASPHALT ROADWAY: 1,232 SF V ---=. SE 162ND ST LOT z AREA, 5,031 LOT 1 'REA: 5,039
CJ g ~~~
c i ~~1
r"'i'"'\ e ~~.!:
VII-)(0-CONCRETE SIDEWALKS: 2,303 SF ~r·~" ALLOWABLE IMPERVIOUS: 3,776 ALLOWABLE IMPERVIOUS: 3,779
ALLOWABLE BUILDING FOOTPRINT: 1 ,761 ALLOWABLE BUILDING FOOTPRINT: 1.7631 '-:------~.,-,--:---,-------,------~~-~ TOTAL IMPERVIOUS AREA: TOTAL IMPERVIOUS AREA:
(j) t: "5.2 "!
NOTES ij i g ~
LOT 3 AREA: 5~40
ALLOWABLE IMPERVIO S: 4,455
ALLOWABLE BUILDING FO PRINT: 2,079
m
~
~
LOT 4 AREA %834
ALLOWABLE IMPERVI US: 6,625
ALLOWABLE BUILDING FO TPRINT: 3,092
,
DRIVEWAY:
320 SF
DRIVEWAY:
320 SF
1 LOT 3 1
BUILDING FOOTPRINT:
1,800 SF
1 LOT 41
DRIVEWAY: 1,584 SF
DEVELOPED IMPERVIOUS TOTALS
n
MISC IMPERVIOUS:
200 SF
~
n
MISC IMPERVIOUS:
200 SF
U
2,283 SF 2,283 SF
BUILDING FOOTPRINT:
1,763 SF
I I
Mise IMPERVIOUS:
200 SF
1 LOT 21
I
I
I
I
I
I
BUILDING FOOTPRINT:
1,773 SF
DRIVEWAY:
320 SF
DRIVEWAY:
320 SF
BUILDING FOOTPRINT:
1,763 SF
I I
MISC IMPERVIOUS:
200 SF
1 LOT 11
II
MISC IMPERVIOUS:
200 SF
U Ir--LO-T ---'5/
LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 ON-SITE TOTAL (SF) FRONTAGE IMPROVEMENTS
TOTAL IMPERVIOUS (sF) I 2,283 2,283 2,320 3,904 2,293 13,083 3,535
TOTAL PERVIOUS (SF) I 2,756 2,751 3,620 4,930 2,772 16,829 3,791
\
~ $
1. SEE FIGURE 8 FOR Q) I'i ~
FLOW CONTROL C ~ ~
BMP'S. OJ ~ j
C ·~ E
LOT 5 AREA: 5,065
ALLOWABLE IMPERVIOUS:
3,799
. . ·C·~ ~ Q~ ;;
U) (~ '"
(1)
Z
0
I-
0
Z
0
0
0 w a..
0
..J
W > W
ALLOWABLE BUILDING FOOTPRINT
1 ,773 0
TOTAL IMPERVIOUS AREA:
2,293 SF I{) 0
('II
W II
0:::-:> w (j~
-0 lL (IJ
SECTION II -CONDITIONS AND REOUIREMENTS SUMMARY
The proposed project is subject to a Full Drainage Review and is therefore subject to all
eight core requirements and all six special requirements. These requirements are listed
below along with a discussion oftheir applicability to this project.
Core Requirements:
Req. #1 Discharge at Natural Location:
Existing discharge locations will be maintained.
Req. #2 Offiite Analysis:
See Section III below.
Req. #3 Flow Control:
The project triggers flow control requirements as the amount of new plus replaced
impervious surface will be greater than 2,000 SF. Based off the City of Renton
Flow Control Application Map, this project is required to meet the flow control
duration standard for forested conditions. In addition, at least one flow control
BMP's is required.
Req. #4 Conveyance System:
The new conveyance system will be designed to meet this requirement.
Req. #5 Erosion and Sediment Control:
Construction ESC systems have been designed to meet this requirement.
Req. #6 Maintenance and Operations:
A Declaration of Covenant is required for this project and is attached in Appendix
E for review by City of Renton staff before recording. The proposed facilities
will be owned and maintained by the land owners.
Req. #7 Financial Guarantees:
A financial guarantee will be necessary lor this project. Bonding will be required
for the construction of improvements and will be obtained prior to construction.
Req. #8 Water Quality:
Lime-lite Short Plat
11419 SE 162n(1 Street
Page II Project No. [4011
Springlinc Design LLC
This project will construct 4,416 SF of new plus replaced POlS surface and will
not trigger the 5,000 SF threshold.
Special Requirements:
Req. #1 Area Specific Requirements:
No area specific requirements are applicable to this project.
Req. #2: FloodplainlFloodway Delineation
This project is not adjacent to any floodplains or floodways. Therefore no
delineation is necessary.
Req. #3 Flood Protection Facilities:
This project is not adjacent to any applicable areas and will not affect any
applicable facility.
Req. #4 Source Controls:
This project will provide appropriate source controls.
Req. #5 Oil Control:
No oil control requirements are applicable to this project
Req. #6 Aquifer Protection Area
Limelite Short Plat
11419 SE 162nd Street
Page 12 Project No. 14011
Springline Design LLC
SECTION III -OFFSITE AI\ALYSIS
Task I -Study Area Definition and Maps
Maps of the project s it e and surro u nd in g area were obta in ed from th e King County G IS
website . Topographi ca l s it e info rmation is from the topographical su rvey for the project.
Storm drainage system maps were co mpil ed fro m City of Rento n G IS maps and as-built
plans. Aerial im ages were obtai ned fro m GoogleMaps .
Task 2 -Resource Re view
T he City of Renton Pub li c Works Department was contacted regarding the reso urc es
listed in sect ion 2 .3.1.1 of the 20 10 C ity of Renton Addendum to KCSWDM. The
follow in g is a summar y or th e resou rce review:
• Ad o p ted Basin Plans
o Ki ng Co unt y Basin Nam e: East Lake Washington (per Kin g Co unt y
iM ap)
• Basi n Reco nn a issa n ce Summary Reports
o None comp leted to ou r knowledge.
• Floodp lain/F loodway (FEMA) Maps
o The site is not w ithin a floodplain o r floodway per FEMA mapping.
• Other Offsite Ana lys is Reports
o Oth er Offsite A na lysis Report s were n ot availab le.
• Env ironme n ta ll y Sen s it ive Areas Map
o There are no Environmentally Se ns iti ve a reas m apped within the v ic init y
of the s it e.
• USDA So il s Survey
o The USDA Web Soi l Survey shows th e project so il s as being Alderwood
gravelly sa nd y loam. A geotech report w ill be completed before the
co nstruct io n permit is app li e d for.
• Wetlands Inventory Maps
o T he re are no Wetlands mapped w ithin the v ic inity of the s it e.
I .im elit~ Short Plat
11419 SF 162"J Sired
Pag..: 13 Projec1 No. 140 11
Springlinc De sign L I.C
Task 3 -Field Inspection
A Level I downstream analysis was perlormed o n the m orning of May 22,20 14.
Weather condition s during the down stream a nalysis consisted of overcast skies and th e
temperature was 60-65 degrees F. No rainfall occurred in the week prior to th e analysis.
On-site landuse and topography was confirnled and the downstream conveya nce system
from th e project s ite was id entified. Additiona l information was provided by S teve Lee
w ho is the stormwater e ngineer a t the C ity of Re nton. He was able to confirm and he lp
clarify questions about the downstream conveyance described below.
Field Notes
(Refer to th e down stream conveyance system (F igure 6) for ditch and structure loca tion s. The Y.
ora mile down stream point at which th e projec L area is less than 15% orthe tributary area was is
shown in Figure 7. Th e downstream an a lys is ends along SE I 64'h Streel.)
CD<Il
Stonnwater from the project s ite fl ows n orth and west to an existing ditch within the
right-or-way ditch along SE 162nd St and I 14 th Ave SE. This diteh beg ins from a high
point to the east of the proj ect site in front of 11427 SE 162 nd Street. The ditch is s loped
to the west towards the project property wher e it intersects the existin g driveway to the
west of the property line. S torm water overflows the ditch a nd s heet fl ows across the
driveway w he re the ditch continues to flow towards SE 162 nd Street. T he ditch a long
the north property lin e has a bottom width of ap proxim a tely 2.5 -3.0 ft w ith 3: I s id e
s lopes. The grass ditch appears to be in good condition. Different sections of the ditch
bottom ha ve heavy vegetation and le aves.
Li mclitc Shon Pl at
]1419 SI-: 16200 Street
Page 14 Proje ct Nt). 140 II
SI)ringJilH.: Desi gn LtC
Q) The di tch head s south a lo ng 5E 162 nd 5t when it reac hes the 1141h Avc 5E
in tersection. The ditch geometry remai ns th e same. Th e ditch bottom is covered with
Icaves in cer ta in areas.
(])The diteh continu es so uth a long 11 41h Ave 5E until it reach es a 12" concrete c ul ve rt
that crosses beneath the west d ri veway orthe proj ec t s it e . Th e cu lve rt is ha lfway 1~i11 of
sm a ll rocks and debri s .
Limc lit c Sh m1 Pla t
11411) Sf·: 162,,<1 Street
Pa ge \5 P l\~iec l No. 140 11
Sp rill g!i nc De sign I.L C
@Q)The ditch flows to th e south property lin e where it enters another 12 " concrete
culvert th at crosses beneath th e dri veway of the adj acent pro perly. Thi s section of the
ditch conta in s trash and debris. The ditch bottom is 1.5 '-2' with exposed so il s and s id e
slopes of approximately 4 : I. T he cu lvert has a concrete hea dwall and is partial ly full of
debri s.
® The ne xt section of the ditch is com pl ete ly fill ed w ith large rocks . T he culvert end s
can not be observed with in thi s section of th e d it ch.
Limclilt: Shorl Pial
11419 SE 16 r d Stn:et
Page 16 Proj ect No. 140 11
Spri nglinc Des ign L1 .C
(J) The down stream e nd of th e culvert can be o bse rved fi-om the next ditch sectio n. The
12" concrete c ul ve rt is in good condition a nd re ma in s free fro m obstru c ti o n s .
® The g rass ditch in this section is approxi m ately 4-5 feet w id e w ith a 1.5'-2.0' ditch
bottom and I : I s id e s lo pes. T he ditch is fr ee o f debris and vegetation is maintained.
l.il11eiite Short Plat
l l -l l !) SI : I 61 ,LJ Street
Page 17 Project No. 1401 1
Spri ngli nc Dl.:sign LLC
(2) The upstream end of th e 12 " concrete cul ve rt is parti a ll y filled wi th de bri s and
weeds. The do wnstrea m end of the culvert has a cracked concrete hea dwall.
Limelite Short Pla t
11419 SE 162"dStrect
Page lR ProjecL No . [4011
Springline Design LLC
® The ditch is at thi s locatio n is full of o ve rgrown weeds . The ditch va ri es in bottom
w idth between 2.0'-3.0'. T he ditc h depth is approx im ate ly 2.5 ' w ith 1'1 s id e s lopes.
(jJ) T he up stream end of the 12" concrete c ul ve rt is no t vis ible due to overgrown
vegetati o n. The do w nstream end has a rock hea dwa ll. The culvert is obstructed by
overg ro \v n vegetat io n.
@ T he ditch flows so uth to S E I 64 1h SI w here it enters a 12" CMP pipe. T he ditch in
thi s sect io n is app rox im ate ly 6.67 feet w id e with a 3 foot bottom and I: I s id e s lo pes . T he
diteh bottom is eroded in one location w ith ba re soils be in g vis ibl e.
Lim elile Short Pia l
114 19 S E 162,0 Sln:el
Page 19 Projec t No. 140 1 1
Sp ri ngli nc De sign Ll .C
@ The 12" C MP pip e is o bstru cted w ith vegetat io n.
@ The C MP pipe is connected to the catch bas in in the northe as t comer of the I 14 th
Ave SE and SE I 64th St intersection. T he catch ba s in is con structed w ith bricks and has
an exposed soi ls bottom.
[.imcli tc Sho o Pl at
1141 9S E l llrd St rl."Ct
Pag e 20 Proj t."C 1 No. 140 I I
Spring lin c Desig n LLC
@@Thedownstream conveyance syste m crosses 1141h Ave SE in a 12" CM P p ip e
where it connects to a catch basin to west of th e intersec ti on. T hi s stru cture was locked
a nd could not be accessed.
Limclitc Short Pla t
114 19 Sf:: 162n<1 St n;.;t
Page 21 Project No. 14011
Spri nglin..:: I ksig.n U .C
@@ The pipe system conti nu es to the west where it connects to a catch basin in the
shou ld er. This struct ure was also lo cked and cou ld not be accessed .
@@ T he pipe system is connected to another catch basin near the end of the sidewa lk
along SE I 64 th Street. Access to this structure was prohibited due to the catch basin
being locked.
L imelile Short Pia L
[1 4 19 SE 162 nd Stn:el
Page 22 Projec t No. 140 I 1
Springlinc De sign 1.I .e
® The catch bas in flow s in to a d iteh v ia a 15" concrete pipe. The p ipe en d is pa rtially
full w ith deb ri s.
@ The ditch runs west a lon gsi d e SE I 64 1h SI. It is diffi cu lt to assess the limits o f th e
ditch due to the overgrown vegetation.
l .i rtldil~ Short Pial
1141I)SI': 162"J S1rcl.!!
Page 23 Proj l.!t l No. 140 11
Sp rin glinc Ik sign 1.1.("
The extent of the down stream ana lysis ends approximately 140 feet to th e wes t of the
ex istin g cu lvert.
Task 4 -Drainage System Description and Problem Description
There are no drainage problems w ithin the downstream system recorded on fil e with th e
C ity of Renton.
Task 5 -Mitigation of Ex isting or Potential Problems
The conveyance system along SE 162 nd Avc andl141h Ave SE will be replaced with a
tightline system . The brick calch basin at th e northeast comer of th e 144 1h Ave S E and
and SE I 641h Street wil l be rep laced. The conveyance system crossing 114 1h Ave SE and
head in g to the west along S E 164 Street was recently constructed. Potential problem s are
not anti cipated.
l .imcli tc Short Plat
11 4 19SE I 62 nd Street
Pa ge 24 Projl:r..:t N\). 140 II
Springlinc Design LLC
1/4 OF A MI LE DOWNSTREAM \
POINT AT WHICH PROJECT AREA ~
15% OF TRIBUTARY AREA
12" CONC CULVERT (3
12" CONC CULVERT (5
DITCH COMPLETELY FILLED WITH ROC KS (6 ~
W
ICI)
I-W
C'» ~«
12 " CONC CULVERT C7
~
100 0 100 e ---'
SCA LE: 1" = 1 00'
SE 164th ST
14) CATCH BASI N WITH GRATE
u g .....J .~ -" t c ~
CJ)~
'U) E
Q) ~ -o i
CD g
C ~
Ol .§
C ~
.~~
CJ) ~
I
I-«
0..
~
0
.J
ti
~ « w a:
~ z
~
0
0
<0
w a: ::>
~~~ ~~~
~~l
f. .. i
8 ...
I
;...
~ (J
-0 tic/)
N
0
0
~
(/)
("") » r
!:'
rr O
N
0
0.
N
8
springline design lie
FIGURE 7 -DOWNSTREAM LIMIT OF THE OFFSITE C;~I Eng;needng I S;teDe,elopmenl I r,ansport";on
ANALYSIS ~~!~I:'~~~8~~~nue,Suite 50' fahK~:~;i~~g
SCALE 1" -200' www.s pringlinellc.com
SECTION IV -FLOW CONTROL AND WATER QUALITY FACILITY
ANALYSIS AND DESIGl'\
Flow Control
This project is a large lot low impervious BMP site. The required amount of flow control
BMP's for this project is 6,646 SF which is 40% of the targeted impervious surfaces.
This project will implement 5,238 SF of permeable pavement and utilize a restricted
footprint of 1,571 SF. The restricted footprint was calculated by taking the proposed
building footprints and subtracting this square footage from the maximum allowable
building footprint allowed by the City of Renton. Refer to Figure 8 for flow control BMP
areas.
This project will provide flow control for new plus replace impervious surfaces using a
detention pipe in addition to the flow control BMP's discussed. This 5 foot diameter, 300
foot long detention pipe with a flow control structure was designed using KCRTS. The
tank size will be remodeled and updated during the construction permit submittal to
reflect the latest building footprint revisions. Refer to Figure 9 for the contributing areas
to the tank and to Appendix IV for the KCRTS modeling report.
Water Quality
This project will not be required to implement water quality treatment facilities as it will
not add over 5,000 SF of pollution generating impervious surfaces for right-of-way or
private improvements.
lime1ite Short Plat
11419SE 1620d Street
Page 27 Project No. 140 II
Springline Design LLC
t
IIJ
.!!! ,«
i
ALLOWABLE FOOTPRINT: 2,079 SF I O'
PROPOSED FOOTPRINT: 1,800 SF
RESTRICTED FOOTPRINT: 279 SF
BUILDING FOOTPRINT:
1,800SY"
\
I
ALLOWABLE FOOTPRINT: 1,761 SF ,II AllOWABLE FOOTPRINT, 1.763 sr 1
PROPOSED FOOTPRINT: 1.761 SF PROPOSED FOOTPRINT: 1 ,763 SF I
RESTRICTED FOOTPRINT: 0 SF RESTRICTED FOOTPRINT: 0 SF I ,,' I I ' -r/' I,
,: /CJ CJ I
[j
0' I
ALLOWABLE FOOTPRINT: 3,092 SF,. " _'.. . • . .
PROPOSED FOOTPRINT: 1 ,800 SF ,: •.. -'. y ,
RESTRLClill rOOTP"NT 1 ,292 sri ,,' _; -, J, I '
t, ";;.~~~l' '
,II'
'..., ~. ~
-'-~
ALLOWABLE FOOTPRINT: 1, 773 SF'~ . "0 , . . '. PROPOSED FOOTPRINT: 1 773 SF " b7J77l;/7777777777777777V7~d RESTRICTED FOOTPRINT: 0 SF •..
1
FLOW CONTROL BMP'S
FRONTAGE
LEGEND
PERMEABLE PAVEMENT ~
...
I:
TOTAL
LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 IMPROVEMENTS
PERMEABLE PAVEMENT 320 320 320 1,904 320 2,054 5,238
RESTRICTED FOOTPRINT 0 0 279 1,292 0 0 1,571
ITOTAL FLOW CONTROL BMP'S 6,809
1 REQUIRED FLOW CONTROL BMP'S 6,646
-I FLOW CONTROL BMP REQ MET? YES
~ (~ .g
-1 g
C 5r
-ME ~~~ mOl.!::
QJ2 ~~r
~~~ ~ (f) -
Q) !
"O:§
ill ~
C ~
CJ')~ c '$
._ .S
"-g-o..",
(f) ~
(J)
0...
~
(Xl
..J
0
0:
I-
Z
0
()
~
..J
11.
IX)
W
0:
b
'" I . ...
:JW O~ 11.~
0
0 z
-I
:::j '" ]] , ~ ,
eo ;D [JJ < ;D CS " C Vl C
(/) (/) -I a a
'" '-' Z '-' CN
" " (;) n " » ]] m »
-I
0
0 m
-I m
Z
-I
0
Z
-I »
Z
?\
,---------------------7 / , n4TH AVE SE
<-~-' ---------('
" ' ' \ "'-~ -"--c~ -'---'~"~-~.:-=~\ , ,
/
,,--"-::-, "j,\" --~----I~--I--------~-
I
Ie
I
r
I
I
I
-'.
I
'''''-
c=J
',,-
~.'''.','.', ',,', '"
<'0 ", .........
D~'
-l]-I~
h
"
c=J' I
I ,
I
I
I
I
I
,,' , _ . I e-'-------------------------------------------'. ---_
I
,
springline design ue
Civil Engineering I Site Development I Transportation
FIGURE 9
ffi
Oi
I\)
~
~
DETENTION TANK CONTRIBUTING AREA 3131 Western Avenue, Suite 501 ph 2069578311
Seattle, WA 98121 fax 206 957 8313 '#\NW.springlinellc.com
SCALE 1" -20'
SECTION V CONVEYANCE SYSTEM DESIGN A~D ANALYSIS
The conveyance system along 114th Ave SE within the right-of-way is designed to
convey the peak flow for the tributary area. The 12" pipes are designed to have a 0.50%
slope with a full flow capacity of 2.729 CFS. The 25-and I DO-year storm events have
peak flows of 1.763 CFS and 2.190 CFS. Refer to Appendix C for the tributary areas and
HydroCAD modeling using the SBUH/SCS methodology and uniform flow analysis.
SECTION VI -SPECIAL REPORTS AND STUDIES
A geotechnical analysis of the site was performed and is included in Appendix G.
SECTION VII OTHER PERMITS
No other permits are required.
SECTION VIII -EROSION AND SEDIMENT CONTROL
ESC Measures are being addressed as follows:
• Clearing Limits: Clearing limits are being delineated by perimeter silt fencing and
chain link fencing.
• Cover Measures: Temporary cover shall be installed if an area is to remain
unworked for more than seven days during the dry season (May 1 to September
30) or for more than two consecutive working days during the wet season
(October 1 to April 30). Any area to remain unworked for more than 30 days shall
be seeded or sodded, unless the City of Renton determines that winter weather
makes vegetation establishment infeasible.
• Perimeter Protection: Perimeter protection will be implemented by silt fencing
around the site perimeter where drainage paths require.
• Traffic Area Stabilization: A stabilized construction entrance will be built for
construction traffic.
• Sediment Retention: Catch basin protection has been provided and is shown on
the projects TESC plans.
• Surface Water Control: Surface water will be collected and conveyed via swales
with check dams as necessary.
• Dust Control: Dust control, if required, will be provided through the limited use
of water trucks.
Limelite Short Plat
11419 SE 162 nd Street
Page 30 ProjectNo.140tl
Springlinc Design LLC
SECTION IX -BOND QUANTITIES AND DEC LARA TION OF COVENANTS
A bond quantity worksheet for the proposed improvements is provided in Appendix D.
Declaration of Covenants which are required for the proposed project will be provide at
the construction pennit phase (see Appendix E).
SECTION X -OPERATIONS AND MAINTENANCE MANUAL
An operation and maintenance manual which outlines required regular maintenance
necessary for the proposed stonnwater facilities is provided in Appendix F. The
maintenance of the stonnwater facilities will be perfonned by the owners of the lots per
maintenance agreement.
Limelite Short Plat
l1419 SE 162nd Street
Page 31 Project No. 14011
Springline Design LLC
Appendix A
Civil Plans
LIMELITE SHORT PLAT
F.C'A) 3~r{.E ~rn '!IJ~j,,'IP~L
~s ~~,'[',CD J' IIIC CI' 0'
r,LII~,C MJST J: I(LCl J:TW[:N flI_ 'Y
ca
~E T~: ~PPLl:~NTS;COWRI,CTO~S rt~SPONSIBIL TY TJ OBU N ftLL
DMuM CITY ()O F.E~TCN. ,983 ~~\iD
J'I. TIES ')-A.L BE ~D,USTEC TO ;,N~L CP,IC[
+f~:"r ~iJY ~:::~~ RIA 11i:~ OR 11f'.'fI(),)·!f~1
:JF ~:NTI)~ PLA', RE'IIEW~R
TII[ I,PPRO,[) PU,,',S 'MII~I
'/,11 lIf:;LH-'IIHIIH~ APPh'U'IAI
,", C:~~;';~?~'?~'::'J:'.C;J." ~J':.~:.:: :;~I~~;,~~L~Cy ~~~ ~1J~~~~R~,~~~\Pi;I?~~:r~f~~
STLCTurC5 $III,L. fior DC P[~MITTcO 'hiT liN 10 ITO or "II[
FRO'" THE TOP (IF ~~n Ch\~'IE_ aA~H
GIDN
LIN: OF
CALL 48 HOURS
BEFORE YOU DIG!
1-800-424-5555
springllne design
C,.,I Englneenng I S~e Oevelopment I Tran.poftaboo
;:!~:~:~~~~ue Su'te~t f:2:O~;78~;;1
REN TOr\j, WASHINGTON
CONSTRUCTION SEOUENCE
i-'rlOiif ~LM+R (l' f'I ~IIPlR'il<;~H I:<l U.N',OLlllA"EO 'oI'IH -I-E
(1,'rERCErro~ }IKES rl~:: ';LO~:
E~CSO'I C8URO. I/EASIJ~:::: I~
I~N.U",CTU~oR~ RE::M~'E~Ci\TON3
~n-/,rf'[l1011 J ~r TIL
\I[ASLR[~ SO
I', t,CCO"]ANC[ '11111 T·':: E~':SON AIW ~ECI\IE~l
i~AT ',','ILL BE UI\\ORKEC ,OR .~O~:: T .... A~ S:',Er, )~YS O,P I~G r'IL
'II\JOJ -13::R MLLCf1, ::M~D3T. ~ A::,TI(· jH:E-:I~C C~ FC!UI',~I-NI
12 S'~8IL([ A"~ , .. pC/,s T·IM R(I,C I
SMuLT'\·'[QI,SLV
SOOS CREEK SANITARY SEWER NOTES
BE PE,F'Y~M:D ~ '11TH Hi: SHCIFCAl'(!~jS '.1-r,F IloIRI( I, AlSO "H·Ru·11
DSTPIT
",'. '.' •••• .S:WCR ~~INS. ric ~P'RCHINE
fXI~TI~:, LlIII·lf~ ';~~II ~f LorAfEJ
MAil· ~I IHf ,e~'''~H'P''''"'''''~\
,E,ISION CF ReAD'MY CR I" Hf ~HC~';IRt.Cfl
IJ.l C8"1'.o '-CR 11,~PELm:, :,J:;H hflO~S·'U(II(I~~ ~""II ~f
F~I) EEFORE ft:CE~rANCE BY II·E [,ISTPC
9 THEHCCCm,C8NC'.",,, ~JTFY T~E CISTPe ,'-Te SCf·E]UL: ~ 'RE-CCNSTRLC'OI. ME::11~C ~I 1+
f" I, ~Rf -\ LfISIRIJC 1m, f ~_' F.EPRESE~JT~nI,E AT LEAST 42
B:FOIiE
Af MAlll O~IY W, H '~~I .~ ~PP~(lVfo, :l· 1+ ITWrt
~N) RE-CH~NNELD AS ~ECUIIiED T~[ ',:w
PRELIMINARY NOT FOR CONSTRUCTION
TG!C~
TG!C~
\ 1:1 .. I rl ,
'L liLJ~J~j
PA~ECT~tP I! I 'I L ~ II I<~ ·
'---_ -d64~ J l ,-liC ll~=
VICINITY MAP
SURVEY INFORMATION
e
\ ~~"IS 0° E?EARI'lGS rE~
I ,() r 4 !"~l~ ·f
~ ['I5HJG LEGA" '?~M '.1(' ': 4'-, ~fk
'I~Ll~l[ 12 0-
CONTACTS
OWfJER
UMELIT
PRELIMINARY PLAT SUBMITTAL
CI TY OC
CO\/~Q /\\~C
~~'1)3~o\ll
:LoCTR:A_
SOOS CREEK WATER GENERAL NOTES
doREINM--m ,'5 'aSTRICT
,y THE COM'!ERCI~_ I\NC/IlR ell'IS ml PLMIS A~PROI,'D 81" THE
3 PRIOR TO CONS·~JCm.G \\,4TE~ ~rrRorRIA-E ~TR[ET~ BE C_EARD GRADEC
DE',ELC'PP /C~\~ ;''''.CT0~ ~N) A_L
5~ALL CD'FOR~' fO THE 3rECI~IC,\TlO~,S Cf -~E OISTp-le ALL COS"S F~F f1srECTlhG SJO-PE:J'jSTRUCTICN SHALL
If-F [l,I>', LH~ IN ACCITIO~'Co Tf-l ~r~~l'~~J CH~RLfo, AM) J~AlL BE P~ID EEcLiRE I.CCE~TAN:~ ay -IE OI~TFICr
3Y -~E DE','CC""'IW','",'''Q<
63'J-990:) Ie SCHECLLE,' PRE,,","limD'/D"
·&fll~l:. Irf lif" (H~/C()N ',I-A I N(I
30:fCRE ST~~TI',G
-I-l:fvIlDJ"~/U)~IRA::I(1k :i~PII (WAIN Al I)~l; I:: Mf· r wfRM' RFUUI~f'll~r;
~C~DJLEC ~T "EAST ~g I"OIJ~S If, AD'!~'ICE
I BEFORE A~V CONSTPKTlO',
,','ORKS DES C~l E~GI',E::R
2 ALL .I~'ITS 0-ClEARlf,G A~D ~PEAS O·
03SER','[C CLRI~C ~ONSPJ:;O',
ALL ~O:QJ RED SO:['I·~U.TrIO~/E~CSIO'" COfI-F.OL F~CIUTIES MUST 30: TO _~rj) C"EARI~~ ~N)rF.
CON3T,,'X"10'J 'C [',SJf<[ T'I',T SWflGH UlDeN II/,fC" DOCS ~.OT ,'Ll ~ROSIC~. ;,',C S[Olr..CNT ,1,eIUT[S
:'k
~ FO~ 'RLlSICf./SD ME'JHTIC~. COTROL O'ILl" IT tOES
()fPIPES,RESfPICTnpc
All fk()':I()',/~f H.HWIIC~ LDNI~() 6 II'ICH\ ~ l,rKE b P<:()Ukfll WITH ~ MI~I\WM
::".C;'·,I.:,";,; '," /~~ f~:i"~'RCifl~!~'\I~E il L1' 4 "(\ ~ II·n QIJAP~Y
CALL 48 HOURS
BEFORE YOU DIGI
1-800-424-5555
springlne design
C,VIl Englne-en"'ll Sore Devekopr1"l(!nt I T'.nsporta~on
;::~I:e~:~~;~ue Sullee.Jl f~;:g:~7a~~~1
UTILITY SERVICE NOTES
/,N) N',[RT [l[V,qJN~ WITH PLJM81~,G
3 C(S,GN 81Jl~ ~rRI'WL[fl conp~CTOP I[,?rl SZ[ ~r rlRC ~GCF, LINE ~Z[ ~y,[ SIZ[~ f'PIi)~ -~, (on~pr-I')~
PPOT,CKf, :3PRi'iVLEP. DESGN M.D PREF~RE n ... [
212-S0-04J(g)
r'I[STP"[CFMSH,NGTO',WPC212-oC'-CQ:2)
SE 162ND ST TYPICAL ROADWAY SECTION
4 rn'~E48L, PA'JE'IENT SI)::W~L<
A~O
114TH AVE SE TYPICAL ROADWAY SECTION
PRELIMINARY NOT FOR CONSTRUCTION
TCjCP
TGjCP
IC4TE I APf"'R
PRELIMINARY PLAT SUBMITTAL
LlMELITE SHORT PLAT
11419 SE 162ND ST
I\O~ES DET)·IL'
07/03/14
C2
, W
CIJ
W
:;(
~
--------------------~~~~~~=~ , ' '''''' , ,'rr,-l'~~'NDSTn~ /&/ . , -:--' .. \--7\ "~' I~'~ /iI'J' ...... ,.1_ .. -. ~. '~.' .~ .... ~,---:-:-;.-... / .. ' .. ' ','",.' =1 ... ~ ... :+=~ .. , :I~_. ~--.J "r~ .¥~. '-" .. ~~.-.--~ .. ~~.=-.. --'-=' -c-/~.;/ .-;-~-··-·-·~-l· .~~~-.~~-=-' .. -f ~-<-T_1-1-7T-··.:··7.~:+------~:~ I ~ 111'i:'<~Y? I -----". '. ,." 1 r-;":1 C":e: j I
• I .• 'I ' '·1-~. I I' i
f-'I, Ii, -· c. !,>' 1 11----'-': ._:, ::--,---.,:. -<---I _------,
111\ i·': I I III' III , ~ .. ~ 1,,_, -,-. 1 LOT 31 I
II rll"" .'.'. : '1'/ . .-t..:<:)T2l I I " i . ". " "." ' V I
III / 'i.l(.:J I ~I «I -~------------~ I
1/ I···\'I I I I / '/'1. 1 ~ :~I\i I I' -"1
rIL.,-LtJ' \~ .. -. . [LOT4 ~ . :
II i'···7·:r· I I I
I '.' 1.' "'., ;., _
1:/ -I~·~.I·J\.~.>{:.· 1------I --I
l!/ I+i., . . . _I
II .. ~.~ .. ::. ~+t ~ ';"~"~. ':,' 7'··>·.~ .. ,·.:.· ~ r~~ .. "',' ::-.. :~ .. ~.~~: •. ~ ... '~~~:~; :.>
III I: '1
1
.,1' ..~ .. ' <i)·.f ., .. ,.>.:;,,,.,.. ... ' .. o •••••• .' "'.' •• "" '.' ' •• " 1~~Jt. ~:-... :~:-.. :~.L·>~~ __ I:··_····_I i I I
III ;!':'~: .. . .... _.'. ----------------------t J
11 lif!j ___ --------_______________ ,
' .~ . . L~ -------- --__________ --n'J33-____________ _
[LOr-1]
LOT5'
CITY OF RENTON
I APPROVED BY: _
I :::::::::: ----
LEGEND
~ ~
~
NOTES
----
~
rRSfT<T"f,N) Ni[} OF
2
:I ~::M2vi: OI~P1G
M~~~I/EMt~l"
~E:: JfF TE f"F.ChT~GE -OR c,rrlll
RI~I·r-OF-'''M
2.
PRELIMINARY NOT FOR CONSTRUCTION PRELIMINARY PLAT SUBMITTAL
sprin~Jllne deSign
CIV"Englneenng I Sote Developmeml Transportallon
3131 Western Avenue, SUite 501 Qh20095783tl
~atlleWA98121 la>2009571).313
TC/CP
LlMELITE SHORT PLAT
11419SE162NDST
I CITY OF RENTON
-.~-.-r------------~--------------___ ~T-----
-, ! ! -__ : CO' I ' __
APPROVED BY: ______ _
";;;1';:;:';"'-/---~-~-=-----c-~ -,.~-~-.::-:=--:~/ -~-=~: ~~ -,~_~/ I_;L~~ /~I / I I '~/"'''l[' ..., , ~,! // -------------'---~/-------r-,-1---+ --T ----f -~ ,_1-if '/ / I I
#,.....Y ./ ~t I - _ l_---=-_
, I
1"
1
~-: r -j
1,1: ... I :/1 I ',-"'"C[ , I
~-;-.J ~, __ I!:OT~
Ii: \ I' i LOT 2: I
1/1 ': ~// rT I..-y -} ~-~ I
I
I/i! ! i I I-,f----------------,I'T IT
I :' ' ) ,: ! ---1-./ \ I :: I ~: I ~:
I , I \, .' ro' w, l -:~\ +--j ~:;:
k--W LI,' 1 LOT 41 : :
1/
1 'I ' ,I t-r--"1' _ -:,~rc,l' "CE'
/ ' ' , I '. ',/ ,'"
/ ~ I I I It\. J ,i lr g"' ~G 1/ I 'I I , _______ ,__ ____ __ ____ __ _
/,: /"---~:, W-, I ~-~, I' 8" SO ~-_________ ~ ~---J" ,"'-~ f
' I I I' -~~-'. ,; Je--'
,---. -I I + '-':J"""--'" "" , I , _
II -IT! --y-= ---'--'--'-,,-
I I, I' £,------------'-~ ------_ ----_ ___ 0.,
,'/ : I 'e, ,---;;------_', --_____ _
i/I : I I c:----= ____ - -__ .== _-_-_-__ -__ -~=_-__
LOTlj
.L:.0IS]
1
i
--r
, ,
--------~
,\
APPROVED BY: ___ _
I A~~ROV~D BY: -----
~
l:l n
-~--~
"
LEGEND
l1li
• -
•
."
e L ,
TABLE OF DRAINAGE AREAS ,-
w. TTI-: ----=---~ __ ---=-~-------_ ---=-• ---f-I I I II~-__ I_~ ~ __ • ~ L -; --------_ --. --__ • _ I , ~, i)!it~·:'· ___ L_<!i-___ ,_ -~ __ :_~ ~~~ --~~~(w: = ~ ______ --_ -'-: __ -___ <-___ -___ -_" __ --___ ~_~~_-'lC_' c_~= f ___ --_~ _~ ___ <1-___ ~_ - ------ ----__________________ , _ ... ~ J.. . . .. ,
PRELIMINARY NOT FOR CONSTRUCTION
spr-irlgline dEsign, I ,'",10"
lG/CP
ClvIIEnglne<!nngISlteOev810pm8tl111ransportatK}n
TG/CP
~::~I:'~;~8~;~nu .. Su,te 501 I~; 2::9~~78~~~ 1 ~ ~ LlMELITE SHORT PLAT
11419 SE 162ND ST
DRAINAGE AND UTILITY PLAN
87/83/14
C5
s;Jrlnglin8 ci8sigrl
C,v,l Eng,neenng I Site Development I Transportallon
31J1Westernllvenue.SUlle501 ph 2069576J11
Seattle WA98121 tax~06951831J
" I ~I
" I ~I
~,I '
1 .... /
" I :'1
m I ~I ~ I ~I
~
~I ~ CI
L,I
~ 1 --I
I
I ----
/'
i
~:
--I
=1
I iJ
1/ ," ~,
01
"I
Sll
"Z;l
"~''''
LEGEND
2
;e-
IYf'f ? ~~.
PRELIMINARY NOT FOR CONSTRUCTION
TG/~P
CITY OF RENTON
APPROVED BY: _____ _
APPROVED BY: ____ _
I_APPROVED BY:
~ '""--_/
o
'"
1-:·0'
"~ I s·, -"l '
'v ~ c",;;'en 0, SE 162ND ST , : : 'J oce. ~ ::,
11["> IN C I I \
sec " ~;':, \ ---,':'{i -\.~ ~~ ~4~~ ~";;"~~,--~ ~,~ '.";CC~f;=:;=::'1-_~ ::.~'" ;;;T±~"~ ~~ ~; -j""--
\ IE '"A .. cur 1.-I I 174 LF 12 SD@17j'; I '
)1 l/P.I ~Il r-----1;r--------___ 1..____ I \, ~ ) ),)3 I')} ~T I 'oft ~ EU TI~FI\ II / --------=~~-~_____rr_~ -==--=--=----=-~~-----~~~~~ __ = ~:p--:_= ~~-:h:-~ I T~--=:''''/ J~O 4ND CJ-n
'((II -1/ :;;;-:---. ;. ii' / I ------I ----I ---=--........ 14
'6 '?l~r ~ / . · / . " " ~ ",. ~ 1 \ ' ,I I ' ~r-
LEGEND
'C 27 rir --,/ /0 ~o I . -.,,7 "\ I ........ _ b ~ 11M IFIREHiJR~m \////>~\ '..1 i~;( '-----------.--.--,.-.---.--.--/' j • l---h----r-----+ _____ . 1 ____ _ I'" '''-~ f/ Y "" , "'. ":, ',. . i '/IT,'. " .' ~~I' . ,'I" .71.-; .. ; I, .. I~.'T"", " h
2-, /' ~,Lr'-s-..f / ---------'-~~-----'-t-~J:':L~-----~,-~-'-~ __ .:J....:____'__t--.-~"~~~-L.,-~ __ I ~_
I I I ~! , 1 ' , , \
( . ;~(f--------------'---f----l---L-, _J_.-'-.-+-I-l-',-,-7-+---J-' ___ j
k' I:, I I 1 ,I 1 ":: '] I. J ',',j I 1 /'
III >* ,-I I" '. '" f""" 1 -~ ',--;; "" 99 J gg" ---J I , ,I I .",' /. 'I I 1 I I' I " I . l! iii :~-: --j i I L f II, I'd I 1 ,
1 I: 1 I
495
490
I
485 ~I ~II:
,~'t~.: :==
480
C,CI .
::~
~,'I -
~I
~
TO~ 'J
475
470
465
10+50 11+00
SE 162ND ST PROFILE
I I PfiO~I):
,-CF CIJ~3
-'----~
11+50
~I ~
12+00
I g
CALL 48 HOURS
BEFORE YOU DIG!
1-800-424-5555
495
490
485
480
475
470
465
12+50
Iii
•
•
~
~ ~
CJ
~I
1--CITY OF RENTON
APPROVED BY
I APPROVED BY' --
~PAOVED BY _____ _
PRELIMINARY NOT FOR CONSTRUCTION PRELIMINARY PLAT SUBMITTAL
sonWlllne dc;SIQIl
C'Vil Eng.,eenng I Slte Dcvclopmeml Transportatloo TG/CP
~~!~I~;;:r~8~;~nue, SUite 501 I~: 2:9~;7~;~!
DATE
"
490
485
480
475
470
465
460
"I cr I I I 1'1'1' HI I / ~ / 'til 1'1 I " I '1'1@I'lrt •• : I I I ~ • I T I' " -( T I ,J'\'/' .', ,1 LJ I : L,~"I I ,~: :':1 \ I I',,: "/.;'1 \ I"~ :'1,: '~11 I /1 ~.I ,1'" " , " \ J '/ \ "~ ,J
, II ''>',' " I I I' , .. " " T n. 3 W" -I I' ',/.', ",I " I ,I" .. 1 T 1,.-. I
I I' '-. "I .., '. \ ATI H 8A~IJ TYPE 1/.'. 'l'~ '-'. I '" I
: '.'1' ";: \: I I ' " ",I • ,-::-'" ,,"; _L --I-~ T'-:--';---"-'-'j--.-I--t---:"'r --• ...-I r -2 '" :,\.:,:~-~;; 7~,~ ~ ,L, ""'.~ :,~a;" .~,f'--r -I ~= ~ ~=--(~;<~-J-~~~' ~' .. ', 1=-=----0--'-er "~CI' "\~~~) .. ' > ~::-:------,-.1.., -,-h :Is_ --c;r:----~--<:" ---.::::.w":I±-,..,~ _.' ~io~)!:'-'';"' ___ ..:) ___ f:-lrn I[ ," ;\~ '." ~. r--~---'-T---'4-----.---,-. ~~'; . -..., __ ~_~'~""_______._'.~, ~;-_.~ ~"'_)8 IE I)
, '.' ,', .. ,' I I , " -' ' ~I ' ,~ I I , I , I I I ? --"-,-"2.''t,
" ". ro \ '='b \ \ I -.. I' " ~---'------=-i: -------==----=-_-1 ------=------------l-~ ____ ~ _ \! \ I _ -', --=-~ -L---7t-r--= =-=--==-=-,=t= t= ~ -+--=-~T=~ / --------j-i-I-----~~-1---LI -------L _______ L_ ~
/ ~H -loT' I ~TA LI-51 LI _I ,I \
/ i 21' I -7~_~S~) __ --_::_t ____ IE 18 _21;1_ -!-------t ,/ \
' 1'",1 114TI-1AVESE • ---1-i --
I ~ ~rA )l-t-lq', II
I I
\~~W __
490
"'e ~ 485
N
.,..:..
iJ;'w
480
:l
470
I
460
20+50 21+00 21+50 22+00 22+20
114TH AVE SE PROFILE
RO~}N~) S[CTIOns
lET~I_
COO)) ~1rL ~LL ~'F ,7~mo', :~ E'j~LPE F,UL TY
RF()LI~·')
PRELIMINARY NOT FOR CONSTRUCTION
spnrgline cies'gn
TG/CP C .... ,I Eogl"""ong I Slie [)eveloprnenl I Tran'porlallon
TCjCP
~~~I~:r;S~~nue. SUlle 501 !: 2;:9~~7S~~~ I
CALL 48 HOURS
BEFORE YOU DIG!
1-800-424-5555
~TY CF
R[I'FO\
<:
',1
'---iiI"""""ii-~
LEGEND
III
•
WMER/FRE
•
c=J ' , ,
C=I
~
CITY' OF RENTON
APPROVED BY'
L APPROVED BY' DATE' _
Appendix B
KCRTS Detention Tank Calculations
Project locat~on
Computing Series
Regional Scale Factor
Production of Runoff Time Series
Sea-Tae
PREDEV ts!
1 00
Data Type Reduced
Creating Hourly Time Series File
Loading Time Series File C ,KC_SWDM,KC_DATA,STTF60R rn!
Till Forest o 32 acres Scaling Yr. 8
Loading Time Series File C ,KC_SWDM,KC_DATA,STTG60R rnf
Till Grass o 40 acres Adding Yr: 8
Total Area 0.72 acres
Peak Discharge 0 107 CFS at 6 00 on Jan 9 in Year 8
Storing Time Series File PREDEV.tsf
Flow Frequency Analysis
Time Series File.predev tsf
Project location Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak
(CFS)
o 054
0.023
0.059
o 008
.028
051
045
108
Computed Peaks
3
7
2
8
6
4
5
1
15·00
16 00
7·00
19.00
8.00
1/18/06 16 00
11/24/06 4·00
2/09/01
1/05/02
2/27/03
3/24/04
1/05/05
1/09/08 6.00
Production
Project location Sea-Tac
Computing Series DEV.ts!
Regional Scale Factor 1.00
Data Type Reduced
Creating Hourly Time Series File
-Peaks
(CFS)
0 108
0.059
o 054
o 051
0.045
0.028
o 023
o 008
o 091
of Runoff Time
Rank Return Prob
Period
100.00 0 990
25.00 0 960
10.00 o. 900
5 00 0 800
3.00 o. 667
2 00 0 500
1 30 0 231
1 10 0 091
50.00 0 .980
Series
loading Time Series
o 40 acres
File·C ,KC_SWDM,KC_DATA,STTG60R rn!
Till Grass Scaling Yr. 8
Loading Time Series File:C ,KC_SWDM,KC_DATA,STEI60R rn!
Impervious o 32 acres Adding Yr· 8
Total Area 0.72 acres
Peak Discharge. 0.236 CFS at 6·00 on Jan 9 in Year 8
Storing Time Series File:DEV.tsf
Flow Frequency Analysis
--------------------------------------------------------
Time Series File.dev.tsf
Project Location"Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak -Peaks Rank Return Prob
(CFS) (CFS) Period
0.113 2/09/01 2 00 0.236 100.00 .990
0.086 1/05/02 16 .00 o 137 25 00 .960
o 137 2/27/03 7 ·00 0 127 10.00 .900
0.087 8/26/04 2 .00 0.119 5.00 .800
0.107 10/28/04 16 :00 0 113 3.00 .667
0.119 1/18/06 16 .00 0.107 2 00 500
0 127 10/26/06 0 00 0 087 1 30 .231
0 236 1/09/08 6 00 0.086 1.10 .091
:omputed Peaks 0.203 50 00 .980 =
Computing Durations:
Flow Duration from Time Series File:predev tsf
Cutoff Count Frequency CDF Exceedence_Probability
CFS % % %
0.014 60831 99.203 99 203 0.797 0 797E-02
o 016 101 0.165 99 367 0.633 0 633E-02
0.018 68 0.111 99.478 0.522 0 .522E-02
o 021 50 0 082 99.560 0.440 0 .440E-02
o 023 58 0.095 99 654 0.346 0 346E-02
o 025 44 0.072 99 726 0.274 a .274E-02
0.027 38 0.062 99.788 0 212 0 212E-02
029 22 0 .036 99 824 0 .176 0 176E-02
.032 25 0 .041 99 .865 0 135 0 135E-02
034 17 0 028 99 892 0 108 0 .108E-02
036 14 o. 023 99 915 o. 085 0 848E-03
038 10 0 016 99 932 0 068 0 685E-03
.040 10 0 016 99 948 0 052 0 .522E-03
0 043 9 0 .015 99 962 0 .038 0 375E-03
0 .045 8 0 .013 99 .976 0 .024 0 .245E-03
0 .047 5 0 .008 99 .984 0 .016 0 .163E-03
0 049 4 0 .007 99 990 0 .010 0 978E-04
0 .051 1 0 .002 99 992 0 .008 0 815E-04
0 .054 2 0 .003 99 .995 0 .005 0 .489E-04
0 056 0 .002 99 997 0 .003 0 326E-04
0 058 0 .002 99 998 0 .002 0 163E-04
0 .060 0 .002 100 .000 0 .000 O. OOOE+OO
0 .062 0 .000 100 .000 0 .000 0 OOOE+OO
Top of Riser
r Notched
Effective Storage Depth before Overflow (Ft) 15_000 1
Elevation at 0 Stage (Ft) 10.000 1
Riser Head (Ft) [il1li __ ..... ...1
Riser Diameter (In) 112.000 1
Number of Orifices 12 1
r. Flat
fOINT of Compliance Setup
Edit Test tlYDROGRAPH Parameters
Define BISER Orifices and Notch
SAVE to detentiontank.rdf
o stage is the outlet invert or bottom of live storage
& Riser Definition
-Orifice Definitions ----------
Orifice 2: Diameter (In) 11.100
Height (Ft) I :::3=:.7=00=====~
Orifice 1: Diameter (In).110~.~50~0~~~~~
Entries Complete
Maximum Discharge is 0.62 pi/4 D·2 (2g"headrO.5
--~-?
or-------------~-----------
rfOh(d)'hryE.c~nca
Duration Comparison Anaylsis
Base FIe: predev.tsf
New FIe. rdout.tsf
Cutoff Un ts' Discharge in CFS
-----Fraction of Time-----
Cutoff
0.014
o 017
o 021
0.024
0.028
0.031
0.034
0.038
0.041
0.045
0.048
0.052
0.055
0.058
Base
0.80E-02
0.56E-02
O.44E-02
0.30E-02
0.21E-02
o 15E-02
0.98E-03
o 70E-03
0.47E-03
o 26E-03
0.15E-03
0.82E-04
0.33E-04
o 16E-04
New %Change
0.26E-02 -67.7
0.20E-02 -64.6
o 17E-02 -62.2
o 14E-02 -54.3
o . llE-02 -45.3
0.78E-03 -46.1
o 51E-03 -48 3
0.29E-03 -58 1
0.21E-03 -55.2
o 15E-03 -43.8
0.98E-04 -33 3
0.49E-04 -40 0
O.OOE+OO -100.0
O.OOE+OO -100 0
---------Check of Tolerance-------
Probability Base New %Change
0.80E-02 0.014 0.012 -13.4
0.56E-02 0.017 0.013 -26.4
0.44E-02 0.021 0.013 -37.4
0.30E-02 0 024 0.013 -46 1
0.21E-02 0 028 0.016 -40.3
0.15E-02 0.031 0.023 -25.5
o 98E-03 0.034 0.029 -16.1
0.70E-03 0.038 0.032 -14.8
0.47E-03 0.041 0.035 -15.0
0.26E-03 0.045 0.038 -14.1
0.15E-03 0.048 0.046 -4.4
0.82E-04 0.052 0.049 -4.8
0.33E-04 0.055 0.052 -5.8
o 16E-04 0.058 0.052 -11.2
Maximum positive excursion = a 000 cfs 0.7%)
occurring at 0.048 cfs on the Base Data:predev tsf
and at a 049 cfs on the New Data.rdout.tsf
Maximum negative excursion = 0.012 cfs (-48.3%)
occurring at 0 025 cfs on the Base Data:predev.tsf
and at 0.013 cfs on the New Data rdout.tsf
Appendix C
114th AVE SE CONVEYANCE CALCULATIONS
114TH AVE SE
n r 4,. +
~ --i ..
° ..
:;;! ,
--u
tl' 0...,
tl' 0",
Co .~$
<D tl'0
<D tl'C
(/)
(/)(/) ., '1,.
'" ~
114TH AVE SE PIPE SYSTEM TRIBUTARY AREA
SCALE 1" -100'
ClI m
c;)
I\)
Z o
~
~
~
~3:: _ -u .... ..., .... '" .... <
(/)0
.,C (/) ,.
'" r;'
(/)
N rr g
(/)
" ,. ,
f"
-Io"r o
N
0
0_
U N 0
0
springline design uc
Civil Engi neering I Site Development I Transportation
3131 Western Avenue, Suite 501 ph 2069578311
Seanle .WA98121 fax206957B313
www.springlineUc.com
Peak Flow Rate
12" Pipe @ 0.50%
e I Drainage Diagram for 14011 pipe conveyance
Prepared by {enter your company name here} 611712014
HydroCAD® 7.10 sin 003807 © 2005 HydroCAD Software Solutions LLC
14011 pipe conveyance
Prepared by {enter your company name here}
HydroCAO® 7.10 sin 003807 © 2005 HydroCAO Software Solutions LLC
Type fA 24-hr 25-yr Rainfall=3.40"
Page 2
6/17/2014
Time span=0.00-100.00 hrs, dt=0.05 hrs, 2001 points
Runoff by SBUH method
Reach routing by Stor-Ind+ Trans method Pond routing by Stor-Ind method
5ubcatchment 175: Peak Flow Rate Runoff Area=155,899 sf Runoff Oepth=2.01"
Tc=6.3 min CN=86 Runoff=1.763 cfs 0.599 af
Reach 18R: 12" Pipe @0.50% Peak Oepth=0.58' Max Vel=3.6887 Ips Inllow=1.763 cIs 0.599 af
0=12.0" n=0.012 L=30.0' S=0.0050·/' Capacity=2.729 cIs Oulflow=1.761 cfs 0.599 af
Total Runoff Area = 3.579 ac Runoff Volume = 0.599 af Average Runoff Depth = 2.01"
14011 pipe conveyance Type fA 24-hr 25-yr Rainfall=3.40"
Page 3
6/17/2014
Prepared by {enter your company name here}
HydroCAD® 7.10 sin 003807 © 2005 HydroCAD Software Solutions LLC
Subcatchment 175: Peak Flow Rate
Runoff 1.763 cfs@ 7.98 hrs, Volume= 0.599 aI, Depth= 2.01"
Runoff by SBUH method, Time Span= 0.00-100.00 hrs, dt= 0.05 hrs
Type IA 24-hr 25-yr Rainfall=3.40"
Area (sl) CN Description
55,444
100,455
155,899
98 Paved parking & rools
79 50-75% Grass cover, Fair, HSG C
86 Weighted Average
Tc Length Slope Velocity
(ftlsec)
Capacity Description
(cfs) (min) (feet) (ftllt)
6.3 Direct Entry.
Subcatchment 175: Peak Flow Rate
Hydrograph
Type IA 24-hr 25-yr
Rainfall=3.40"
Runoff Area=155,899 sf
Runoff Volume=O.599 af
Runoff Depth=2.01"
Tc=6.3 min
CN=86
o~, ~;;::=:=:~~~~~~~,~, ~W, o 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
Time (hours)
14011 pipe conveyance
Prepared by {enter your company name here}
HydroCAD® 7.10 sin 003807 © 2005 HydroCAD Software Solutions LLC
Type IA 24-hr 25-yr Rainfall"'3.40"
Page 4
6/17/2014
Reach 18R: 12" Pipe @0.50%
[52) Hint: Inlet conditions not evaluated
Inflow Area '"
Inflow
Outflow
3.579 ac. Inflow Depth'" 2.01" for 25-yr event
1.763 cfs @ 7.98 hrs, Volume= 0.599 af
1.761 cfs @ 7.98 hrs, Volume= 0.599 af, Atten= 0%, Lag= 0.1 min
Routing by Stor-lnd+Trans method, Time Span= 0.00-100.00 hrs, dt= 0.05 hrs
Max. Velocity= 3.6887 fps, Min. Travel Time= 0.1 min
Avg. Velocity'" 2.2164 fps, Avg. Travel Time= 0.2 min
Peak Depth= 0.58' @ 7.98 hrs
Capacity at bank full= 2.729 cfs
Inlet Invert= 30.00'. Outlet Invert= 29.85'
12.0" Diameter Pipe, n'" 0.012
Length= 30.0' Slope'" 0.0050 '/'
Reach 18R: 12" Pipe @ 0.50%
Inflow Area=3.579 ac
Peak Oepth=0.58 '
Max Vel=3.6887 fps
0=12.0"
n=0.012
L=30.0'
8=0.0050 I,.
Capacity=2.729 cfs
14011 pipe conveyance Type fA 24-hr 100-yr Rainfafl=3.90"
Prepared by {enter your company name here}
HydroCAD® 7.10 sin 003807 © 2005 HydroCAD Soltware Solutions LLC
Time span=0.00-100.00 hrs, dt=0.05 hrs, 2001 points
Runoff by SBUH method
Reach routing by Stor-Ind+ Trans method -Pond routing by Stor-Ind method
Page 5
6117/2014
5ubcatchment 175: Peak Flow Rate Runoff Area=155,899 sl Runoff Depth=2.46"
Tc=6.3 min CN=86 Runoff=2.190 cIs 0.732 al
Reach 18R: 12" Pipe @0.50% Peak Depth=0.68' Max Vel=3.8574 Ips Inllow=2.190 cIs 0.732 al
D=12.0" n=0.012 L=30.0' S=0.0050 'f' Capacity=2.729 cfs Outftow=2.188 cIs 0.732 al
Total Runoff Area = 3.579 ac Runoff Volume = 0.732 af Average Runoff Depth = 2.46"
14011 pipe conveyance Type fA 24-hr 100-yr Rainfall=3.90"
Prepared by {enter your company name here}
HydroCAD® 7.10 sin 003807 © 2005 HydroCAD Software Solutions LLC
5ubcatchment 175: Peak Flow Rate
Runoff 2.190 cfs @ 7.98 hrs, Volume= 0.732 af, Depth= 2.46"
Runoff by SBUH method, Time Span= 0.00-100.00 hrs, dt= 0.05 hrs
Type IA 24-hr 100-yr Rainfall=3.90"
Area (sf)
55,444
100,455
155,899
Tc Length
(min) (feet)
6.3
CN Description
98 Paved parking & roofs
79 50-75% Grass cover, Fair, HSG C
86 Weighted Average
Slope
(ft/tt)
Velocity
(ft/sec)
Capacity Description
(cfs)
Direct Entry,
5ubcatchment 175: Peak Flow Rate
Hydrograph
Type IA 24-hr 100-yr
Rainfall=3.90"
Runoff Area=155,899 sf
Runoff Volume=O.732 af
Runoff Oepth=2.46"
Tc=6.3 min
CN=86
10 15 20 25 30 35 40 45 50 55 60 65 70 75 BO 85 90 95 100
Time (hours)
Page 6
6/17/2014
14011 pipe conveyance Type fA 24-hr 100-yr Rainfall=3.90"
Prepared by {enter your company name here}
HydroCAD® 7.10 sin 003807 © 2005 HydroCAD Software Solutions LLC
Reach 18R: 12" Pipe@0.50%
[52] Hint: Inlet conditions not evaluated
3.579 ac, Inflow Depth = 2.46" for 100-yr event
2.190 cfs @ 7.98 hrs, Volume= 0.732 af
Page 7
6/17/2014
Inflow Area =
Inflow
Outflow 2.188 cfs @ 7.98 hrs, Volume= 0.732 af, Allen= 0%, Lag= 0.0 min
Routing by Stor-Ind+ Trans method, Time Span= 0.00-100.00 hrs, dt= 0.05 hrs
Max. Velocity= 3.8574 fps, Min. Travel Time= 0.1 min
Avg. Velocity = 2.3289 fps, Avg. Travel Time= 0.2 min
Peak Depth= 0.68' @ 7.98 hrs
Capacity at bank full= 2.729 cfs
Inlet Invert= 30.00', Outlet Invert= 29.85'
12.0" Diameter Pipe, n= 0.012
Length= 30.0' Slope= 0.0050 '/'
Reach 18R: 12" Pipe @0.50%
Hydrograph
Time (hours)
Inflow Area=3.579 ac
Peak Oepth=0.68'
Max Vel=3.8574 fps
0=12.0"
n=0.012
L=30.0 '
5=0.0050 'I'
Capacity=2.729 cfs
Appendix D
Bond Quantity Calculation
Site Improvement Bond Quantity Worksheet Web date: 1112112005
® King County
Department of Development & Environmental Services
900 Oakesdale Avenue Southwest
Renton, Washington 98055-1219
206-296-6600 TTY 206-296-7217
Project Name: Limelite Short Plat
Location: 11419 SE 162ND ST
Clearing greater than or equal to 5,000 board feet of timber?
______ yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1019
BONOQUANTITY.xlsx
For alternate formats, call 206-296-6600.
Date: 6/30/2014
Project No.:
Activity No.:
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
Unit prices updated: 02/12102
Version: 04/22102
Report Date 717/2014
Site Improvement Bond Quantity Worksheet Web date: 11/21/2005
Referencetl
EROSION/SEDIMENT CONTROL Number
Backfill & compaction-embankment ESC-1
Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3
Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3)
Ditching ESC-4
Excavation-bulk ESC-5
Fence, silt ESC-6 SWDM 5.4.3.1
Fence, Temporary (NGPE) ESC-7
Hydroseeding ESC-S SWDM 5.4.2.4
Jute Mesh ESC-9 SWDM 5.4.2.2
Mulch, by hand, straw, 3" deep ESC-10 SWDM 5.4.2.1
Mulch, by machine, straw, 2" deep ESC-11 SWDM 5.4.2.1
Piping, temporary, CPP, 6" ESC-12
Piping, temporary, CPP, 8" ESC-13
Piping, temporary, CPP, 12" ESC-14
Plastic covering, 6mm thick, sandbagged ESC-15 SWDM 5.4.2.3
Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1 (2)
Rock Construction Entrance, 50'x15'x1' ESC-17 SWDM 5.4.4.1
Rock Construction Entrance, 1 00'x15'x1' ESC-18 SWDM 5.4.4.1
Sediment pond riser assembly ESC-19 SWDM 5.4.5.2
Sediment trap,S' high berm ESC-20 SWDM 5.4.5.1
Sed. trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1
Seeding, by hand ESC-22 SWDM 5.4.2.4
Sodding, 1" deep, level ground ESC-23 SWDM 5.4.2.5
Sodding, 1" deep, sloped ground ESC-24 SWDM 5.4.2.5
TESC Supervisor ESC-25
Water truck, dust control ESC-26 SWDM 5.4.7
WRiTE-IN-ITEMS **** (see Daae 9)
Catch Basin Protection
Page 2 019
BONDQUANTITY.xlsx
Unit
Price Unit Quantity
$ 5.62 CY
$ 67.51 Each
$ 85.45 CY
$ 8.08 CY
$ 1.50 CY
$ 1.38 LF 499
$ 1.38 LF
$ 0.59 SY 3323
$ 1.45 SY
$ 2.01 SY 3323
$ 0.53 SY
$ 10.70 LF
$ 16.10 LF
$ 20.70 LF
$ 2.30 SY 5000
$ 39.08 CY
$ 1,464.34 Each 1
$ 2,928.68 Each
$ 1,949.38 Each
$ 17.91 LF
$ 68.54 LF
$ 0.51 SY
$ 6.03 SY
$ 7.45 SY
$ 74.75 HR
$ 97.75 HR 10
$ 50.00 Each
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
tlof
Applications Cost
1 689
1 1961
1 6679
1 11500
1 1464
1 978
$ 23,270.26
$ 6,981.08
$ 30,251.34
A
Unit prices updated: 02/12/02
Version: 04/22/02
Report Date: 717/2014
Site Improvement Bond Quantity Worksheet Web date 1112112005
Unit Price
GENERAL ITEMS No.
Backfill & Compaction-embankment GI-1 $ 5.62
Backfill & Compaction-trench GI-2 $ 8.53
Clear/Remove Brush, by hand GI-3 $ 0.36
Clearing/GrubbingfTree Removal GI-4 $ 8,876.16
Excavation -bulk GI-5 $ 1.50
Excavation -Trench GI-6 $ 4.06
Fencing, cedar, 6' high GI-7 $ 18.55
Fencing, chain link, vinyl coated, 6' high GI-8 $ 13.44
Fencing, chain link, gate, vinyl coated, 20' GI-9 $ 1,271.81
Fencing, split rail, 3' high GI-10 $ 12.12
Fill & compact -common barrow GI-11 $ 22.57
Fill & compact -Qravel base GI-12 $ 25.48
Fill & compact -screened topsoil GI-13 $ 37.85
Gabion, 12" deep, stone filled mesh GI-14 $ 54.31
Gabion, 18" deep, stone filled mesh GI-15 $ 74.85
Gabion, 36" deep, stone filled mesh GI-16 $ 132.48
Grading, fine, by hand GI-17 $ 2.02
Grading, fine, with grader GI-18 $ 0.95
Monuments, 3' long GI-19 $ 135.13
Sensitive Areas Sign GI-20 $ 2.88
Sodding, 1" deep, sloped ground GI-21 $ 7.46
Surveying, line & grade GI-22 $ 788.26
Surveying, lot location/lines GI-23 $ 1,556.64
Traffic control crew ( 2 flaggers ) GI-24 $ 85.18
Trail, 4" chipped wood GI-25 $ 7.59
Trail, 4" crushed cinder GI-26 $ 8.33
Trail, 4" top course GI-27 $ 8.19
Wall, retaining, concrete GI-28 $ 44.16
Wall, rockery GI-29 $ 9.49
Page 3 af9 SUBTOTAL
*KCC 27A authorizes only one bond reduction.
BONDQUANTITY.xlsx
Existing Future Public
Right-of-Way Road Improvemenls
& Drainage Facilities
UnH Quant. Cost Quant. Cost
CY
CY
SY
Acre
CY
CY
LF
LF
Each
LF
CY
CY
CY
SY
SY
SY
SY
SY
Each
Each
SY
Day
Acre
HR
SY
SY
SY
SF
SF
Privata Quantily Completed
Improvements (Bond Reduction)·
Quant.
0.687
554
Quant.
Cost Complele Cost
6,097.92
12,503.78
18,601.70
Unit prices updated: 02/12/02
Version: 4122102
Report Date: 7/712014
Site Improvement Bond Quantity Worksheet
Unft Price
ROAD IMPROVEMENT HI!.
AC GrindinQ, 4' wide machine < 1000sv RI-1 $ 23.00
AC Grinding, 4' wide machine 1000~2000sy RI-2 $ 5.75
AC Grinding, 4' wide machine> 2000sy RI-3 $ 1.36
AC Removal/Disposal/Repair RI-4 $ 41.14
Barricade, type I RI-5 $ 30.03
Barricade, type III Permanent RI-6 $ 45.05
Curb & Gutter, rolled RI-7 $ 13.27
Curb & Gutter, vertical RI-6 $ 9.69
Curb and Gutter, demolition and disposal RI-9 $ 13.58
Curb, extruded asphalt RI-10 $ 2.44
Curb. extruded concrete RI-11 $ 2.56
Sawcut, asphalt, 3" depth RI-12 $ 1.85
Sawcut, concrete, per 1" depth RI-13 $ 1.69
Sealant, asphalt RI-14 $ 0.99
Shoulder, AC, see AC road unit price) RI-15 $
Shoulder, gravel, 4" thick RI-16 $ 7.53
Sidewalk, 4" thick RI-17 $ 30.52
Sidewalk, 4" thick, demolition and disposal RI-18 $ 27.73
Sidewalk, 5" thick RI-19 $ 34.94
Sidewalk, 5" thick, demolition and disposal RI-20 $ 34.65
Sign, handicap RI-21 $ 65.28
Striping, per stall RI-22 $ 5.82
Striping, thermoplastic, (for crosswalk) RI-23 $ 2.38
Striping, 4" reflectorized line RI-24 $ 0.25
Page 4 of 9 SUBTOTAL
*KCC 27A authorizes only one bond reduction.
BONDQUANTITY.xlsx
ExIs1Ing Futu .. PubU~ Private
Right-of_ ~lmp_!III" Impnwamente
& Dralnaas F~II""
Unft Quant. Cost Quant. Cost Quant. Cost
SY
SY
SY
SY
LF
LF
LF
LF 372 3.604.68
LF
LF
LF
LF 475 878.75
LF
LF
SY
SY
SY
SY
SY
SY
Each
Each
SF
LF
4.483.43
Web date" 11/21/2005
Bond Reduction'"
Quant.
ComDlete Cost
Unit prices updated: 02112102
Version: 4122102
Report Date: 71712014
Site Improvement Bond Quantity Worksheet
Unit Price
RQAQ SURFACING (4" Rock; 2.5 base & 1.5" top course)
For KCRS '93, (additionaI2.S" base) add: RS-l $ 3.60
AC Overlay, 1.5" AC RS-2 $ 7.39
AC Overlay, 2" AC RS -3 $ 8.75
AC Road, 2", 4" rock, First 2500 SY RS -4 $ 17.24
AC Road, 2", 4" rock, Qty. over 2S00SY RS -5 $ 13.36
AC Road, 3", 4" rock, First 2500 SY RS-6 $ 19.69
AC Road, 3", 4" rock, Qty. over 2500 SY RS-7 $ 15.81
AC Road, 5", First 2500 SY RS-8 $ 14.57
AC Road, 5", Qty. Over 2500 SY RS-9 $ 13.94
AC Road, 6", First 2500 SY RS-l $ 1676
AC Road. 6". Qty. Over 2500 SY RS-ll $ 16.12
Asphalt Treated Base, 4" thick RS -12 $ 9.21
Gravel Road, 4" rock, First 2500 SY RS -13 $ 11.41
Gravel Road, 4" rOCk, Qty. over 2500 SY RS-14 $ 7.53
pee Road, 5", no base, over 2500 SY RS -15 $ 21.51
pee Road, 6", no base, over 2500 SY RS -16 $ 21.87
Thickened Edge RS -17 $ 6.89
Page 5 of9 SUBTOTAL
"'Kee 27A authorizes only one bond reduction.
BONDQUANTITY.xlsx
Existing Future Public Prlvats
Right-of-way Road Improvements Improvements
& Drainage Facilities
Un~ Quant. Cost Quant. Cost Quant. Cost
For '93 KCRS ( 6.5" Rock; 5" base & 1.5" lop course)
SY
SY
SY
SY
SY
SY 239 4,705.91
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
LF
4,705.91
Web date 11/21/2005
Bond Reduction-
Quant.
Complete Cost
Unit prices updated: 02112102
Version: 4122102
Report Date: 71712014
Site Improvement Bond Quantity Worksheet Web date. 11/21/2005
Unn Price Unn
DRAINAGE (CPP = Corrugaled Plastic Pipe. N12 or Equivalent)
Access Road, RID I D·1 $ 16.74 SY
Bollards -fixed I D-2 $ 240.74 Each
Sollards -removable D-3 $ 452.34 I Each
* (CBs include frame and lid)
CB Type I D-4 $ 1.257.64
CB Type IL D-5 $ 1,433.59
CB Tyoe II, 48" diameter D-6 $ 2,033.57
for additional depth over 4' D-7 $ 436.52
CB Type II, 54" diameter D-8 $ 2.192.54
for additional depth over 4' D-9 $ 486.53
CB Type II, 60" diameter D-10 $ 2.351.52
for additional depth over 4' D-11 $ 536.54
CB Type II. 72" diameter D-12 $ 3.212.64
for additional depth over 4' D -13 $ 692.21
Through-curb Inlet Framework (Add) D-14 $ 366.09
Cleanout, PVC, 4" D -15 $ 130.55
Cleanout, PVC, 6" D -16 $ 174.90
Cleanout, PVC, 8" D -17 $ 224.19
Culvert, PVC, 4T1 D -18 $ 8.64
Culvert, PVC, 6" D -19 $ 12.60
Culvert, PVC, 8" D -20 $ 13.33
Culvert, PVC, 12" D-21 $ 21.77
Culvert, CMP, 8" D-22 $ 17.25
Culvert, CMP, 12" D-23 $ 26.45
Culvert, CMP, 15" D-24 $ 32.73
Culvert, CMP, 18" D-25 $ 37.74
Culvert, CMP, 24" D-26 $ 53.33
Culvert, CMP, 30" D-27 $ 71.45
Culvert, CMP, 36" D-28 $ 112.11
Culvert, CMP, 48" D -29 $ 140.83
Culvert, CMP, 60" D-30 $ 235.45
Culvert, CMP, 72" D-31 $ 302.58
Page 6 of 9 SUBTOTAL
"KCC 27A authorizes only one bond reduction.
BONDQUANTITY.xlsx
Each
Each
Each
FT
Each
FT
Each
FT
Each
FT
Each
Each
Each
Each
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
Quant
ExIsting Future Public Private Bond Reduction"
Rlght.." ..... y Road Improvamante Improvemente
& Drainage FacilltiH Quant
Cost Quant. Cost Quanl. Cost CO'!!J1!e1e Cost
For Culvert prices. Average of 4' cover Wil8 assumed. Assume perforated PVC is same price 88 solid pipe.
6 7.545.84 5
7 14.234.99 1
1
1
1
5
21.780.83
6,288.20
2.033.57
436.52
2.192.54
486.53
874.50
12,311.86
Unit prices updated: 02/12/02
Version: 4122102
Report Date: 71712014
Site Improvement Bond Quantity Worksheet Web date: 11/21/2005
existing Future Public Private Bond Reduction*
Right-of-way Road Improvements Improvements
DRAINAGE CONTINUED & Drainage Facilities Quant.
No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete Cost
Culvert, Concrete, 8" D -32 $ 21.02 LF
Culvert, Concrete, 12" D -33 $ 30.05 LF
Culvert, Concrete, 15" D -34 $ 37.34 LF
Culvert, Concrete, 18" D -35 $ 44.51 LF
Culvert, Concrete, 24" D -36 $ 61.07 LF
Culvert, Concrete, 30" D -37 $ 104.18 LF
Culvert, Concrete, 36" D -38 $ 137.63 LF
Culvert, Concrete, 42" D -39 $ 158.42 LF
Culvert, Concrete, 48" D -40 $ 175.94 LF
Culvert, CPP, 6" D-41 $ 10.70 LF
Culvert, CPP, 8" D -42 $ 16.10 LF
Culvert, CPP, 12" D -43 $ 20.70 LF
Culvert, CPP, 15" D -44 $ 23.00 LF
Culvert, CPP, 18" D -45 $ 27.60 LF
Culvert, CPP, 24" D -46 $ 36.80 LF
Culvert, CPP, 30" D -47 $ 48.30 LF
Culvert, CPP, 36" D -48 $ 55.20 LF
Ditching D -49 $ 8.08 CY
Flow Dispersal Trench (1,436 base+) D -50 $ 25.99 LF
French Drain (3' depth) D-51 $ 22.60 LF
Geotextile, laid in trench, polypropylene D -52 $ 2.40 SY
Infiltration pond testing D -53 $ 74.75 HR
Mid-tank Access Riser, 48" dia, 6' deep D -54 $ 1.605.40 Each
Pond Overflow Spillway D -55 $ 14.01 SY
Restrictor/Oil Separator, 12" D -56 $ 1.045.19 Each
Restnctor/Oil Separator, 15" D -57 $ 1,095.56 Each
Restrictor/Oil Separator, 18" D -58 $ 1.146.16 Each
Riprap, placed D -59 $ 39.08 CY
Tank End Reducer (36" diameter) D -60 $ 1.000.50 Each
Trash Rack, 12" D-61 $ 211.97 Each
Trash Rack, 15" D -62 $ 237.27 Each
Trash Rack, 18" D -63 $ 268.89 Each
Trash Rack, 21" D -64 $ 306.84 Each -----
Page 7 of 9 SUBTOTAL
Unit prices updated: 02112102
*KCC 27 A authorizes only one bond reduction Version: 4/22/02
BONDQUANTITY.xlsx Report Date: 71712014
Site Improvement Bond Quantity Worksheet Web date: 11121f2005
I Unit Price Unft
PARKING LOT SURFACING
No.
2" AC, 2" top course rock & 4" borrow PL-l $ 15.84 SY
2" AC, 1.5" top course & 2.5" base course PL-2 $ 17.24 SY
4" select borrow PL-3 $ 4.55 SY
1.5" top course rock & 2.5" base course PL-4 $ 11.41 SY
WRITE·IN·ITEMS
(Such as detentionlwater quality vaults.) No.
Stormdrain HOPE - 8 inch WI-l $ 40.00 LF
Stormdrain HDPE -12 inch WI-3 $ 50.00 LF
Stormdrain HOPE -60 inch detention pipe WI-4 $ 200.00 LF
Sanitary Sewer pipe -6 inch WI-5 $ 40.00 LF
Water Pipe 1" including exc and backfill WI-6 $ 40.00 LF
Water Meter WI-7 $ 2,000.00 Each
Porous ACP WI-8 $ 50.00 SY
ADA Curb Ramp WI-9 $ 800.00 Each
Concrete driveway WI-l0 $ 35.00 SY
WI-11
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):
30% CONTINGENCY & MOBILIZATION:
Page 8 of9
*KCC 27 A authorizes only one bond reduction.
BONDQUANTITY.xlsx
GRANDTOTAL:
COLUMN:
Existing Future Public
Rlght...,f-way Road Improvemenlll
& Drainage Facilitiea
Quant. Price Quant Coat
792 39.600.00
247 12.350.00
1 800.00
79 2,765.00
55.515.00
86,485,17
25.945.55
112,430,]2
B C
PrIvate Bond Reduction'
Improvemenlll
Quant.
278
14
300
261
303
5
373
Quant.
Cost Complete Cost
11.120.00
700.00
60.000.00
10,440.00
12.120.00
10,000.00
18,650,00
123.030,00
153.943.56
46,183.07
200,126.63
D E
Unit prices updated: 02/12/02
Version: 4122102
Report Date: 7/712014
Site Improvement Bond Quantity Worksheet Web date. 1112112005
Original bond computations prepared by:
Name: Peter Apostol Date: 9/20/2011
PE Registration Number: 35163 Tel. #: 206-957-8311
Firm Name: Springline Design
Address: 3131 Western Avenue Suite 501 Seattle, WA 98121 Project No:
ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS
Stabilization/Erosion Sediment Control (ESC) (A)
Existing Right-at-Way Improvements (B)
Future Public Road Improvements & Drainage Facilities (C)
Private Improvements (D)
Calculated Quantity Completed
Total Right-at Way and/or Site Restoration Bond'r-(A+B)
(First $7,500 of bond" shall be cash.)
Performance Bond' Amount (A+B+C+D) = TOTAL (T)
Reduced Performance Bond' Total '**
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND' REDUCTION:
2
2
2
$
2
$
PERFORMANCE BOND'
AMOUNT
30,251.3
112,430.7
200,126.6
30,251.3
342,808.7
MInimum bond* amount IS $1000.
BOND' AMOUNT
REQUIRED AT RECORDING OR
TEMPORARY OCCUPANCY'"
(E)
T x 0.30 $ 102,842.6 OR
(T-E) $ 342,808.7
Use larger of r )(30% or (I-E)
Date:
~ NOTE: The word "bond" as used in this document means any financial guarantee acceptable to King County.
** NOTE: KeC 27A authorizes right of way and site restoration bonds to be combined when both are required.
PUBLIC ROAD & DRAINAGE
MAINTENANCEIDEFECT BOND'
(B+C) x
0.25 = $ 28,107.7
The restoration requirement shall include the total cost for all lESe as a minimum, not a maximum. In addition, corrective work, both on-and off-site needs to be included
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoratIon
needs to be reflected In this amount. The 30% contingency and mobilization costs are computed in this quantity .
.. ,,* NOTE: Per KGG 27A, total bond amounts remaining after reduction shall not be less than 30% of the anginal amount (T) or as revised by major design changes
SURETY BOND RIDER NOTE: If a bond rider is used, minimum additional performance bond shall be J $ 312,557.4 J(C+D)-E
REQUIRED BOND' AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY DDES
Page 9 ot9
Check out the DOES Web site at www.metrokc.qovlddes
BONDQUANTITY.xlsx
Unit prices updated: 02/12102
Version: 4/22102
Report Date: 7/7/2014
Appendix E
Declaration of Covenants
RECORDING REQUESTED BY AND
WHEN RECORDED MAIL TO:
CITY CLERK'S OFFICE
CITY OF RENTON
1055 SOUTH GRADY WAY
RENTON, W A 98057
DECLARATION OF COVENANT
FOR MAINTENANCE AND INSPECTION OF FLOW CONTROL BMPS
Grantor: _____________ _
Grantee: City of Renton
Legal Description: To be completed at the construction permit phase.
Additional Legal(s) on: __________________________ _
Assessor's Tax Parcel 10#: _________________________ _
IN CONSIDERATION of the approved City of Renton(check one ofthe following) 0 residential
building permit, 0 commercial building pennit, 0 clearing and grading permit, 0 subdivision pennit, or
o short subdivision pennit for Application File No. LUA/SWP ________ relating to the
real property ("Property") described above, the Grantor(s), the owner(s) in fee of that Property, hereby
covenants(covenant) with City or Renton, a political subdivision of the state of Washington, that
he/she(they) will observe, consent to, and abide by the conditions and obligations set forth and described
in Paragraphs I through 8 below with regard to the Property, Grantor(s) hereby grants(grant),
covenants(covenant), and agrees(agree) as follows:
I. Grantor(s) or hislher(their) successors in interest and assigns ("Owners") shall retain, uphold,
and protect the stormwater management devices, features, pathways, limits, and restrictions, known as
flow control best management practices ("BMPs"), shown on the approved Flow Control BMP Site Plan
for the Property attached hereto and incorporated herein as Exhibit A.
2. The Owners shall at their own cost, operate, maintain, and keep in good repair, the Property's
BMPs as described in the approved Design and Maintenance Details for each BMP attached hereto and
incorporated herein as Exhibit B.
3. City or Renton shall provide at least 30 days written notice to the Owners that entry on the
Property is planned for the inspection ofthe BMPs. After the 30 days, the Owners shall allow the City of
Renton to enter for the sole purpose of inspecting the BMPs. In lieu of inspection by the City, the
Owners may elect to engage a licensed civil engineer registered in the state of Washington who has
expertise in drainage to inspect the BMPs and provide a written report describing their condition. If the
engineer option is chosen, the Owners shall provide written notice to the City of Renton within fifteen
days of receiving the Ciry's notice of inspection. Within 30 days of giving this notice, the Owners, or the
engineer on behalf of the Owners, shall provide the engineer's report to the City of Renton. If the report
is not provided in a timely manner as specified above, the City of Renton may inspect the BMPs without
further notice.
4. If the City determines from its inspection, or from an engineer's report provided in accordance
with Paragraph 3, that maintenance, repair, restoration, andlor mitigation work is required for the BMPs,
The City shall notifY the Owners of the specific maintenance, repair, restoration, andlor mitigation work
(Work) required under RMC 4-6-030. The City shall also set a reasonable deadline for completing the
Work or providing an engineer's report that verifies completion of the Work. After the deadline has
passed, the O"TIers shall allow the City access to re-inspect the BMPs unless an engineer's report has
been provided verifying completion of the Work. If the work is not completed properly within the time
frame set by the City, the City may initiate an enforcement action. Failure to properly maintain the BMPs
is a violation ofRMC 4-6-030 and may subject the Owners to enforcement under the RMC 1-3, including
fines and penalties.
5. Apart from performing routine landscape maintenance, the Owners are hereby required to
obtain writlen approval from the City or Renton before performing any alterations or modifications to the
BMPs.
6. Any notice or approval required to be given by one party to the other under the provisions of
this Declaration of Covenant shall be effective upon personal delivery to the other party, or after three (3)
days from the date that the notice or approval is mailed with delivery confirmation to the current address
on record with each Party. The parties shall notify each other of any change to their addresses.
7. This Declaration of Covenant is intended to promote the efficient and effective management of
surface water drainage on the Property, and it shall inure to the benefit of all the citizens of the City of
Renton and its successors and assigns. This Declaration of Covenant shall run with the land and be
binding upon Grantor(s), and Grantor's(s') successors in interest and assigns.
8. This Declaration of Covenant may be terminated by execution of a written agreement by the
Owners and the City of Renton that is recorded by King County in its real property records.
IN WITNESS WHEREOF, this Declaration of Covenant for the Maintenance and Inspection of
Flow Control BMPs is executed this ~~ day of ________ ~" 20~~
GRANTOR, owner of the Property
GRANTOR, owner of the Property
STATE OF WASHINGTON )
COUNTY OF KING )ss.
On this day personally appeared before me:
--:--:-----:-.,-----:--:-:c----:-:---:--~--' to me known to be the individual(s) described in
and who executed the within and foregoing instrument and acknowledged that they signed the same as
their free and voluntary act and deed, for the uses and purposes therein stated.
Given under my hand and official seal this ~~ day of ________ ~" 20~~.
Printed name
Notary Public in and for the State of Washington,
residing at
My appointment expires _________ _
Appendix F
Operation and Maintenance Manual
APPENDIX A MAI'lTENANCE REQUIREMENTS FOR fLOW CONTROL. CONYb. YANCE. AND WQ F ACIUTlES
NO.3 -DETENTION TANKS AND VAULTS
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash and debns Any trash and debns which exceed 1 cubic foot Trash and debris cleared from site
per 1,000 square feet (this IS about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a
height. height no greater than 6 inches.
Tank or Vault Trash and debris Any trash and debris accumulated in vault or tank No trash or debris in vault.
Storage Area (includes floatables and non-floatables).
Sediment Accumulated sediment depth exceeds 10% of the All sediment removed from storage
accumulation diameter of the storage area for Y2 length of area.
storage vault or any point depth exceeds 15% of
diameter. Example: 72-inch storage tank would
require cleaning when sediment reaches depth of
7 inches for more than Y2length of tank
Tank Structure Plugged air vent Any blockage of the vent. Tank or vault freely vents.
Tank bent out of Any part of tank/pipe is bent out of shape more Tank repaired or replaced to design.
shape than 10% of its design shape.
Gaps between A gap wider than Y2-inch at the joint of any tank No water or soil entering tank
sections, damaged sections or any evidence of soil particles entering through joints or walls.
joints or cracks or the tank at a joint or through a wall.
tears in wall
Vault Structure Damage to wall, Cracks wider than Yz-inch, any evidence of soil Vault is sealed and structurally
frame. bottom, and/or entering the structure through cracks or qualified sound.
top slab inspection personnel determines that the vault is
not structurally sound.
InleUOutiet Pipes Sediment Sediment filling 20% or more of the pipe Inlet/outlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes
pipes (includes f10atables and non-f1oatables).
Damaged Cracks wider than Y2-inch at the jOint of the No cracks more than 1f4-inch Wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe
at the joints of the inleUoutlet pipes.
2009 Surface Water Design Manual Appendix A 119/2009
A-5
APPENDIX A MAINTENAI\CE REQuIREMENTS FLOW CONTROl., COI\VEYANCE, AND WQ FACILITIES
NO.3 -DETENTION TANKS AND VAULTS
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Access Manhole Cover/lid not in place Cover/lid is missing or only partially in place Manhole access covered.
Any open manhole requires immediate
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
not working maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and
remove cover/lid after applying 80 Ibs of lift. reinstalled by one maintenance
person.
Ladder rungs unsafe Missing rungs, misalignment, rust, or cracks. Ladder meets design standards.
Allows maintenance person safe
access.
Large access Damaged or difficult Large access doors or plates cannot be Replace or repair access door so it
doors/plate to open opened/removed using normal equipment. can opened as designed.
Gaps, doesn't cover Large access doors not flat and/or access Doors close flat and covers access
completely opening not completely covered. opening completely.
Lifting Rings missing, Lifting rings not capable of lifting weight of door Lifting rings sufficient to lift or
rusted or plate. remove door or plate.
1/912009 2009 Surface Water Design Manual-Appendix A
A-6
APPEl\D[X A MA[NTENA'iCE REQU[REMENTS FOR FI.OW CONTROL, CO'iVEYA'iCE, AND WQ FAClLlT[ES
NO, 4 -CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Structure Trash and debris Trash or debris of more than Yz cubic foot which No Trash or debris blocking or
is located immediately in front of the structure potentially blocking entrance to
opening or is blockIng capacity of the structure by structure.
more than 10%.
Trash or debris in the structure that exceeds 1/3 No trash or debris in the structure.
the depth from the bottom of basin to invert the
lowest pipe into or out of the basin.
Deposits of garbage exceeding 1 cubic foot in No condition present which would
volume. attract or support the breeding of
insects or rodents.
Sediment Sediment exceeds 60% of the depth from the Sump of structure contains no
bottom of the structure to the Invert of the lowest sediment.
pipe into or out of the structure or the bottom of
the FROP-T section or is within 6 inches of the
invert of the lowest pipe into or out of the
structure or the bottom of the FROP-T section.
Damage to frame Corner of frame extends more than % inch past Frame is even with curb.
and/or top slab curb face into the street (If applicable).
Top slab has holes larger than 2 square inches or Top slab is free of holes and cracks
cracks wider than Y4 inch.
Frame not sitting flush on top slab, i.e., Frame IS sitting flush on top slab.
separation of more than % inch of the frame from
the top slab.
Cracks in walls or Cracks wider than Y.z inch and longer than 3 feet, Structure is sealed and structurally
bottom any evidence of soil particles entering structure sound.
through cracks, or maintenance person judges
that structure is unsound.
Cracks wider than Y2 inch and longer than 1 foot No cracks more than '/4 inch wide at
at the joint of any inlet/outlet pipe or any evidence the joint of inlet/outlet pipe
of soil particles entering structure through cracks.
SettlemenU Structure has settled more than 1 inch or has Basin replaced or repaired to design
misalignment rotated more than 2 inches out of alignment. standards.
Damaged pipe joints Cracks wider than Yz-inch at the Joint of the No cracks more than X-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of inleUoutlet pipes.
the structure at the joint of the inlet/oullet pipes
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Ladder rungs missing Ladder is unsafe due to missing rungs, Ladder meets design standards and
or unsafe misalignment, rust, cracks, or sharp edges. allows maintenance person safe
access
FROP-T Section Damage T section is not securely attached to structure T section securely attached to wall
wall and outlet pipe structure should support at and outlet pipe.
least 1,000 Ibs of up or down pressure.
Structure is not in upright position (allow up to Structure in correct position.
10% from plumb).
Connections to outlet pipe are not watertight or Connections to outlet pipe are water
show signs of deteriorated grout. tight; structure repaired or replaced
and works as designed.
Any holes-other than designed holes-in the Structure has no holes other than
structure. designed holes.
Cleanout Gate Damaged or missing Cleanout gate is missing. Replace cleanout gate.
2009 Surface Water Design Manual -Appendix A [/9/2009
A-7
APPEN[)JX A MAINTENANCE REQUIREMEN rs FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO.4 -CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance Oefect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Cleanout gate is not watertight. Gate is watertight and works as
designed.
Gate cannot be moved up and down by one Gate moves up and down easily and
maintenance person. is watertight.
Chain/rod leading to gate is missing or damaged. Chain is in place and works as
designed.
Orifice Plate Damaged or missing Control device is not working properly due to Plate is in place and works as
missing, out of place, or bent orifice plate. designed.
Obstructions Any trash, debris, sediment, or vegetation Plate is free of all obstructions and
blocking the plate. works as designed.
Overflow Pipe Obstructions Any trash or debris blocking (or having the Pipe is free of all obstructions and
potential of blocking) the overflow pipe. works as designed.
Deformed or damaged Lip of overflow pipe is bent or deformed. Overflow pipe does not allow
lip overflow at an elevation lower than
design
InleUOutlet Pipe Sediment Sediment filling 20% or more of the pipe. InleUoutlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged Cracks wider than %-inch at the joint of the No cracks more than Y.-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
Metal Grates Unsafe grate opening Grate with opening wider than 7/8 inch. Grate opening meets design
(If Applicable) standards.
Trash and debris Trash and debris that is blocking more than 20% Grate free of trash and debris.
of grate surface. footnote to guidelines for disposal
Damaged or missing Grate missing or broken member(s) of the grate. Grate is in place and meets design
standards.
Manhole Cover/Lid Coverllid not in place Cover/lid is missing or only partially in place. Cover/lid protects opening to
Any open structure requires urgent structure.
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
Not Working maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and
Remove coverllid after applying 80 Ibs. of lift. reinstalled by one maintenance
person.
\/9/2009 2009 Surface Water Design Manual -Appendix A
A-8
APPE,"DlX A MAI"ITEJ\ANCE REQUIRE'"IE"ITS FOR PLOW CO'HROL. CONVEYANCE. AI\U WQ FI\ULlllcS
NO.5 -CATCH BASINS AND MANHOLES
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Structure Sediment Sediment exceeds 60% of the depth from the Sump of catch basin contains no
bottom of the catch basin to the invert of the sediment.
lowest pipe mto or out of the catch basin or is
within 6 inches of the invert of the lowest pipe
inlo or out of the catch basin.
Trash and debris Trash or debris of more than ~ cubic foot which No Trash or debris blocking or
is located immediately in front of the catch basin potentiaJly blocking entrance to
opening or is blocking capacity of the catch basin catch basin.
by more than 10%.
Trash or debris in the catch basin that exceeds No trash or debris In the catch basin.
1/3 the depth from the bottom of basin to invert the
lowest pipe into or out of the basin.
Dead animals or vegetation that could generate No dead animals or vegetation
odors that could cause complaints or dangerous present within catch basin.
gases (e.g., methane).
Deposits of garbage exceeding 1 cubic foot in No condition present which would
volume. attract or support the breeding of
insects or rodents.
Damage to frame Comer of frame extends more than % inch past Frame is even with curb.
and/or top slab curb face into the street (If applicable).
Top slab has holes larger than 2 square inches or Top slab is free of holes and cracks.
cracks wider than X. inch
Frame not sitting flush on top slab, i.e., Frame is sitting flush on top slab.
separation of more than % inch of the frame from
the top slab.
Cracks in walls or Cracks wider than lS: inch and longer than 3 feet, Catch basin is sealed and
bottom any evidence of soil particles entering catch structurally sound.
basin through cracks, or maintenance person
judges that catch basin is unsound.
Cracks wider than lS: Inch and longer than 1 foot No cracks more than 1/4 inch wide at
at the joint of any inlet/outlet pipe or any evidence the joint of inlet/outlet pipe.
of soil particles entering catch basin through
cracks.
Settlement/ Catch basin has settled more than 1 inch or has Basin replaced or repaired to design
misalignment rotated more than 2 inches out of alignment. standards.
Damaged pipe joints Cracks wider than "Ih-inch at the joint of the No cracks more than 'X-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of inlet/outlet pipes.
the catch basin at the joint of the inlet/outlet
pipes
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a suliace oil film.
Inlet/Outlet Pipe Sediment Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes.
pipes (includes f10atables and non-f1oatables).
Damaged Cracks wider than lS:-inch at the joint of the No cracks more than %-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
2009 Surface Water Design Manual-Appendix A 119/2009
1\-9
APPDIDIX A MAIl\TENANCE REQUIREME)lTS FLOW CO)lTROL. CONVEYAl\CE, AND WQ FACILITIES
NO.5 -CATCH BASINS AND MANHOLES
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Metal Grates Unsafe grate opening Grate with opening wider than 7/e inch. Grate opening meets design
(Catch Basins) standards.
Trash and debris Trash and debris that is blocking more than 20% Grate free of trash and debris.
of grate surface. footnote to guidelines for disposal
Damaged or missing Grate missing or broken member(s) afthe grate. Grate is in place and meets design
Any open structure requires urgent standards.
maintenance.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place. Coverllid protects opening to
Any open structure requires urgent structure.
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
Not Working maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and
Remove coverllid after applying 80 Ibs. of lift. reinstalled by one maintenance
person.
119/2009 2009 Surface Water Design Manual-Appendix A
A-\O
APPDIDIX A MAINTENANCE REQlIIREV!EI\TS FOR FLOW CO"lTROL, CONVEYANCE, AI\D WQ FACII.ITIES
NO, 6 -CONVEYANCE PIPES AND DITCHES
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Pipes Sediment & debris Accumulated sediment or debris that exceeds Water flows freely through pipes
accumulation 20% of the diameter of the pipe.
Vegetation/roots Vegetation/roots that reduce free movement of Water flows freely through pipes
water through pipes
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Damage to protective Protective coating is damaged; rust or corrosion Pipe repaired or replaced.
coating or corrosion is weakening the structural integrity of any part of
pipe.
Damaged Any dent that decreases the cross section area of Pipe repaired or replaced.
pipe by more than 20% or is determined to have
weakened structural Integrity of the pipe.
Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 Trash and debris cleared from
square feet of ditch and slopes ditches.
Sediment Accumulated sediment that exceeds 20% of the Ditch cleaned/flushed of all sediment
accumulation design depth and debris so that it matches design.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxIous
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as 011, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Vegetation Vegetation that reduces free movement of water Water flows freely through ditches.
through ditches.
Erosion damage to Any erosion observed on a ditch slope. Slopes are not eroding.
slopes
Rock lining out of One layer or less of rock exists above native soil Replace rocks to design standards.
place or missing (If area 5 square feet or more, any exposed native
Applicable) soil
2009 Surface Water Design Manual-Appendix A 1/9/2009
A-II
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEY ANCE, AND WQ FACILITIES
NO. 11 -GROUNDS (LANDSCAPING)
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash or litter Any trash and debris which exceed 1 cubic foot Trash and debris cleared from site.
per 1,000 square feet (this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a
height. height no greater than 6 inches
Trees and Shrubs Hazard Any tree or limb of a tree identified as having a No hazard trees in facility.
potential to fall and cause property damage or
threaten human life. A hazard tree identified by
a qualified arborist must be removed as soon
as possible.
Damaged Limbs or parts of trees or shrubs that are split or Trees and shrubs with less than 5%
broken which affect more than 25% of the total of total foliage with split or broken
foliage of the tree or shrub. limbs.
Trees or shrubs that have been blown down or No blown down vegetation or
knocked over. knocked over vegetation. Trees or
shrubs free of injury.
Trees or shrubs which are not adequately Tree or shrub in place and
supported or are leaning over, causing exposure adequately supported; dead or
of the roots. diseased trees removed.
119/2009 2009 Surface Water Design Manual-Appendix A
A-16
APPcKlJlX A MAINTE'IA'ICE REQUREMEKTS FOR FLOW COKTROL, CONVEYANCE. A'ID WQ FACILITIES
NO. 24 -CATCH BASIN INSERT
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Media Insert Visible Oil Visible orl sheen passing through media Media inset replaced
Insert does not fit Flow gets into catch basIn without going through All flow goes through media
catch basin properly media.
Filter media plugged Filter media plugged. Flow through filter media is normal.
Oil absorbent media Media oil saturated. Oil absorbent media replaced.
saturated
Water saturated Catch basin insert is saturated with water, which Insert replaced.
no longer has the capacity to absorb.
Service life exceeded Regular interval replacement due to typical Media replaced at manufacturer's
average life of media insert product, typically one recommended interval.
month.
Seasonal When storms occur and during the wet season. Remove, clean and replace or install
maintenance new insert after major storms,
monthly during the wet season or at
manufacturer's recommended
interval.
2009 Surface Water Design Manual-Appendix A 1/9/2009
A-35
Appendix G
Geotechnical Report
June 24, 2014
Project No. 14-052
Mr. Todd Karam
Limelite Development
14508 NE 20th Street, Suite 200
Bellevue, W A 98007
Subject: Geotechnical Engineering Report
Proposed Short Plat and Development
16204 _114th Avenue SE, Renton, Washington
Dear Mr. Karam,
PanGE@
As requested, PanG EO, Inc. completed a geotechnical enginecring study to assist you and
your project team with the proposed short plat and development at the above-referenced
property. This study was performed in accordance with our mutually agreed scope of work
as outlined in our proposal dated March 4, 2014, and was subsequently approved by you on
the same day. Our service scope included reviewing readily available geologic data,
conducting a site reconnaissance, excavating five test pits, and developing the conclusions
and recommendations presented in this report.
SITE AND PROJECT DESCRIPTION
The subject property is an approximately 29,900 square foot lot located at 16204 -114th
Avenue SE in the City of Renton, Washington (see Figure I, Vicinity Map). The subject lot
is roughly rectangular in shape, and is bordered to the north by SE 162 nd Street, to the west
by 114th Avenue SE, and to the east and south by existing single-family residences (see
Figure 2, Site and Exploration Plan). An existing single-family residence occupies the
central portion of the site (see Plates I and 2 on Page 2 and Figure 2). A detached garage is
located in the southeastern comer of the lot. The site is covered with short grass with
several mature trees at the time of our field exploration. The existing site grade is generally
level.
; ; J"Ii't\...' \'.\...I ,~. I a .1. \,11 " I',
.... '-\11' \\ \')01112
Geotechnical Engineering Report
Proposed Short Plat and Development: 16204 -1141h Avenue SE, Renton, W A
June 24, 2014
Plate 1. Partial view of the site showing the house
and garage, looking east from 1141h Avenue NE.
Plate 2. Partial site view showing the house,
looking northwest from SE 162"d Street.
We understand that you plan to remove the existing house and garage, and to subdivide the
property into five single-family residential lots. Details regarding the short plat and future
building design information are currently not available. We envisage that the proposed
single-family residences will be wood frame, two-to three-story structures with attached
garages. New private roads or driveways will also be constructed to provide access to the
proposed residences. Additionally, new utilities will also be needed for the proposed
development. We anticipate that site grading for the proposed construction will likely
include cuts and till on the order of 4 feet for the foundation construction, and may be as
deep as 7 to 8 feet for the utility construction.
The conclusions and recommendations outlined in this report are based on our
understanding of the proposed development at this time, which is in tum based on the
project information provided. [f the above project description is substantially different from
your proposed improvements or if the project scope changes, PanGEO should be consulted
to review the recommendations contained in this report and make modifications, if needed.
SUBSURFACE EXPLORATION
Five test pits (TP-I through TP-5) were excavated at the site on March 19,2014, to explore
the general subsurface conditions at the site. The approximate test pit locations were taped
from existing site features and are indicated on Figure 2. The test pits were excavated to
depths of about 7 to 8 feet below the existing ground surface using an excavator owned and
14-052 16204 -114th Ave SE Rpt 2 PanG EO, [nco
Gcotcchnical Engineering Report
Proposed Short Plat and Development: 16204 -114'h Avenue SE, Renton, WA
June 24, 2014
operated by Northwest Excavating, Inc., out of Mill Creek, Washington. A geologist from
PanGEO was present during the field exploration to observe the test pit excavations, obtain
representative samples, and to describe and document the soils encountered in the
explorations. The soils encountered during our subsurface exploration were described and
field c1assilied in general accordance with the symbols and terms outlined in Figure A-I in
Appendix A of this report. Summary test pit logs are included as Figures A-2 through A-6.
The relative in-situ density of cohesionless soils, or the relative consistency of fine-grained
soils was estimated from the cxcavating action of the back-hoe, and the stability of the test
pit sidewalls. Where soil contacts were gradual or undulating, the average depth of the
contact was recorded in the logs. After each test pit was logged, the excavation was
backfilled with the excavated soils and the surface was tamped and re-graded smooth.
SUBSURFACE CONDITIONS
SITE GEOLOGY
According to the geology maps of the area (The Geologic Map of King County,
Washington: scale 1: 100,000, Booth, D. 8., Troost, K. A., and Wisher, A. P., 2007), the
project area is underlain by Vashon Glacial Till (Qvt). Glacial Till deposit (Qvt) is described
by Troost, et aI, as a very dense, heterogeneous mixture of silt, sand, and gravel laid down at
the base of an advancing glacial ice sheet.
SOIL
In summary, our test pits generally encountered three distinctive soil units: (1) topsoil/fill,
(2) till-like deposits, and (3) sandstone. A summary description of these soil units are
summarized below:
Unit 1: Fill -Our test pits encountered about 1 to 5 feet of gray to brown, moist, loose
to medium dense silty sand and sandy silt with trace to some gravel and occasional
organics. We interpret this surface unit as fill due to its disturbed appearance and
presence of organics.
Unit 2: Till-Like Deposits -Below the topsoil/fill, the test pits encountered medium
dense to dense, moist to wet, gravelly silty sand. This unit appeared to be till-like
deposits and is weathered at the upper portion with iron oxide stains. This unit
extended to the maximum depths of the test pits TP-2 through TP-5 at about 7 to 8 feet
14-052 16204 -114th Ave SE Rpt 3 PanGEO, Inc.
Geotechnical Engineering Report
Proposed Short Plat and Development: 16204 -114th Avenue SE, Renton, W A
June 24,2014
below the surface. This unit extended to about 7 feet in TP-I. Coal interbeds were
encountered at about 7 feet in test pit TP-2 and 4 to 8 feet in TP-4. Coal interbeds were
not encountered in other test pits.
Unit 3: Sandstone -Underlying the till-like deposits in TP-I, very dense, gray
sandstone was encountered from 7 to 8 feet, the maximum depth excavated. This unit
is not encountered in other test pit locations within the excavation depths.
GROUNDWATER
Moderate to heavy groundwater seepage was encountered in all test pits at depths of about I
to 5 feet below the surface at the time of our subsurface exploration. The groundwater
seepage is perched above the dense till. It should be noted that groundwater elevations and
seepage rates are likely to vary depending on the season, local subsurface conditions, and
other factors. Groundwater levels are normally highest during the winter and early spring.
GEOLOGIC HAZARDS ASSESSMENT
As part of our study, we evaluated potential geologic hazards at the subject site as defined in
Renton Municipal Code (RMC) Section 4-3-050 (Critical Areas Regulations). The City of
Renton identifies five different types of Geologic Hazards: Steep Slopes; Landslide Hazards;
Erosion Hazards; Seismic Hazards; and Coal Mine Hazards. Based on review of the City of
Renton's sensitive areas maps, the site is not mapped within steep slope, erosion, landslide,
and coal mine hazard areas. Potentially liquefiable soils were not encountered at our
exploration locations; and therefore, the site does not meet the criteria for seismic hazard.
Since the site is flat and there are no steep slopes in the site vicinity, and the site does not
contain potentially liquefiable soil, only the erosion and coal mine hazards are further
discussed in the following sections:
EROSION HAZARDS
The site is not mapped as a high erosion hazard area by the City of Renton. Based on the
test pits excavated at the site, it is our opinion the site soils exhibit low erosion potential. In
our opinion, any potential erosion hazards at the site can be effectively mitigated with the
best management practice during construction and with properly designed and implemented
landscaping and permanent erosion control measures. During construction, the temporary
erosion hazard can also be effectively managed with an appropriate erosion and sediment
14-05216204 -114th Ave SE Rpt 4 PanG EO, Inc.
Geotechnical Engineering Report
Proposed Short Plat and Development: 16204 - I 14th i\ vcnue SE, Renton, W A
June 24, 2014
control plan, including but not limited to installing silt fence at the construction perimeter,
placing rocks or hay bales at the disturbed and traffic areas, covering stockpile soil or cut
slopes with plastic sheets, constructing a temporary drainage pond to control surface runoff
and sediment trap, placing rocks at the construction entrance, etc.
Pennanent erosion control measures should be applied to the disturbed areas as soon as
feasible. These measures may include but not limited to planting and hydro seeding. The
use of pennanent erosion control mat may also be considered in conjunction with
planting/hydroseeding to protect the soils from erosion.
COAL MINE HAZARDS
City of Renton contains abandoned coal mines in several areas that can have potentially
adverse impacts on site development. As part of our study, we reviewed infonnation
contained in the Washington State Coal Mine Map Collection: A Catalog, Index, and Users
Guide, Open File Report 94-7, prepared by the Washington Division of Geology and Earth
Resources (DNR 1994), the Washington State Coal Mine Map Collection
(11 ltr:/ I \V ww .dn r. wa. go v IR esearch Sci ence/T or i cs/( ;eo logy Pu hI i cati OilS L i hrary IPagcs/ coal Ina ps.
~) and the City of Renton Coal Mine Map (Renton 2012) for infonnation pertaining to
historic coal mining operations in the vicinity of the site.
According to City of Renton's Sensitive Area map, the suhject site is not mapped as a Coal
Mine hazard area. However, an area with Moderate Coal Mine Hazards Designation was
mapped about 2 blocks northwest of the site. Based on our review, two mines operated
within the section containing the subject site (Township 23 North, Range 5 East, Section
29). These mines are identified as the Sunbeam Mine and the Renton Mine. However, these
mines appear to be located at least two blocks to the north and northwest of the subject site,
and do not extend below the subject property.
During our field exploration and site reconnaissance, we did not observe any surface or
subsurface indications of coal mining activity, such as mine tailing piles, abandoned mine
openings, or abandoned mining equipment, all of which are typically found near coal mine
operations. Based on the results of our review, in our opinion, the subject site is not directly
underlain by coal mine workings and would have a Low Coal Mine Hazard designation.
14-052 16204 -114th Ave SE Rpt 5 PanGEO, Inc.
Geotechnical Engineering Report
Proposed Short Plat and Development: 16204 - 1 14th Avenue SE, Renton, W A
June 24, 2014
GEOTECHNICAL RECOMENDA nONS
GENERAL
Based on the results of our study, in our opinion, the proposed short plat and development at
the subject site is feasible from a geotechnical engineering standpoint, provided the
geotechnical engineering recommendations contained in this report are followed. The
principal geotechnical engineering considerations for the proposed residential project
include the following:
• Requirements for site preparation.
• Building foundation subgrade support requirement and design parameters; and
• Excavations, excavation support, and dewatering considerations for the building and
utility construction;
Detailed discussion of these items and our geotechnical engineering design
recommendations are presented in the following sections ofthis report.
EARTHWORK RECOMMENDA nONS
Site Preparation
Site preparation includes striping and clearing of surface vegetation, and excavating to the
design subgrade. Site preparation should begin with the removal of surface vegetation
within the proposed improvement areas (i.e. building pads, roadway, and driveway), and
excavating to the design subgrade. Based on our site exploration, we anticipate stripping
depths will be about 12 inches at the site. Organic rich silt/clay soil and other deleterious
materials, if encountered during stripping, should also be removed as part of stripping
operation. All stripped surface materials should be properly disposed off-site or be "wasted"
on site in non-structural landscaping areas.
Following site stripping/clearing and excavation, the exposed soil should be proof-rolled
with a minimum 10-ton steel roller or a fully loaded dump truck. Soft/loose and pumping
subgrade detected during proof-rolling operation should be over-excavated and backfilled
with structural fill. The proof-rolling operation should be observed by a representative of
PanGEO.
14-05216204 -114th Ave SE Rpt 6 PanG EO, Inc.
Geotechnical Engineering Report
Proposed Short Plat and Development: 16204 -114'11 Avenue SE, Renton, W A
June 24,2014
Material Reuse
Based on the test pits excavated at the site, it is our opinion that the on-site silty sand should
not be re-used as a source of structural fill and backfill. However, they can be used as
general till in the non-structural areas. If use of the existing soils is planned, any excavated
soil should be stockpiled and protected with plastic sheeting to prevent wetting and
softening from rainfall.
Structural Fill and Compaction
In the context of this report, structural till is defined as compacted till placed under building
foundations, roadways, slabs, pavements, or other load-bearing areas. Structural fill should
consist of imported, well-graded granular material, such as WSDOT Crushing Surface Base
Course or approved equivalent. Well-graded recycled concrete aggregates may also be
considered as a source of structural till. Use ot' recycled concrete as structural fill should be
approved by the geotechnical engineer.
Structural fill soils should be moisture conditioned to within about 3 percent of optimum
moisture content, placed in loose, horizontal lifts less than 8 inches in thickness, and
compacted to at least 95 percent maximum density, determined using ASTM D 1557
(Modified Proctor). The procedure to achieve proper density of a compacted fill depends on
the size and type of compacting equipment, the number of passes, thickness of the layer
being compacted, and certain soil properties. In areas where the size of the excavation
restricts the use of heavy equipment, smaller equipment can be used, but the soil must be
placed in thin enough layers to achieve the required relative compaction.
Temporary Excavations and Temporary/Permanent Slopes
We anticipate that excavations for the building construction will be about 3 feet. However,
excavations up to about 7 and 8 feet may be needed for the utility construction. In general,
we anticipate excavations to encounter loose to medium dense fill and dense glacial till.
All temporary excavations should be performed in accordance with Part N of WAC
(Washington Administrative Code) 296-155. The contractor is responsible for maintaining
safe excavation slopes and/or shoring. Excavations more than 4 feet deep should be
properly shored or sloped. For planning purposes, it is our opinion that temporary
excavations may be sloped as steep as lH: 1 V in the fill and Y2H: 1 V or flatter in the till.
14-05216204 -114lh Ave SE Rpl 7 PanGEO, Inc.
Geotechnical Engineering Report
Proposed Short Plat and Development: 16204 -I 14th Avenue SE, Renton, WA
June 24, 2014
The temporary excavations and cut slopes should be re-evaluated in the field during
construction based on actual observed soil conditions, and may need to be flattered in the
wet reasons. The cut slopes should be covered with plastic sheets in the raining season. We
also recommend that heavy construction equipment, building materials, excavated soil, and
vehicular traffic should not be allowed within a distance equal to 113 the slope height from
the top of any excavation.
Permanent cut and fill slopes should be graded no steeper than 2H: 1 V. Erosion control
measures such as erosion-control mats and/or vegetation's should be applied to the
permanent slopes as soon as feasible.
Construction Dewatering
Because perched groundwater seepage was encountered at I to 5 feet below the existing
grade in the test pits during our field exploration, the contractor should be prepared to
provide construction dewatering systems in the wet season. Based on our understanding of
the project and site conditions, we anticipate that a conventional dewatering system
consisting of sumps and pumps will be adequate to dewater the temporary excavation.
SEISMIC DESIGN PARAMETERS
The Table 1 below provides seismic design parameters for the site that are in conformance
with the 2012 edition of the International Building Code (IBC), which specifies a design
earthquake having a 2% probability of occurrence in 50 years (return interval of 2,475
years). The spectral response accelerations were obtained from the USGS Earthquake
Hazards Program's Seismic Design Maps and Tools website for the project latitude and
longitude.
Table 1 -Summary Seismic Design Parameters per 2012 IBe
Spectral Spectral Design Spectral
Acceleration at Acceleration Site Coefficients Response
Site Class 0.2 sec. (g) at 1.0 sec. (g) Parameters
Ss St F, Fv Sos Sot
D 1.402 0.523 1.0 1.50 0.935 0.523
14-052 16204 -114th Ave SE Rpt 8 PanGEO, Inc.
Geotechnical Engineering Report
Proposed Short Pial and Development: 16204 -I 14th Avenue SE, Renton, WA
June 24,2014
BUILDING FOUNDA nONS
Foundation Type and Allowable Bearing Pressure
Based on the subsurface conditions encountered at the site and our understanding of the
project development, it is our opinion that the proposed single-family buildings may be
supported on conventional spread and continuous footings bearing on the native till and/or
on newly placed structural fill on native till. Any topsoil/fill below the footings should be
over-excavated and backfilled with compacted structural fill. We anticipate that over-
excavation on the order of I to 2 feet may be needed in some areas to reach bearing soil.
We recommend that an allowable soil bearing pressure of 2,500 pounds per square feet (pst)
be used for sizing the footings. The recommended allowable bearing pressure is for dead
plus live loads. For allowable stress design, the recommended bearing pressure may be
increased by one-third for transient loading, such as wind or seismic forces. Continuous and
individual spread footings should have minimum widths of 18 and 24 inches, respectively.
Footing Embedment
Exterior footings should be placed at a minimum depth of 18 inches below final exterior
grade. Interior spread foundations should be placed at a minimum depth of 12 inches below
the top of slab.
Foundation Performance
Footings designed and constructed in accordance with the above recommendations should
experience total settlement of less than one inch and differential settlement of less than Y2
inch. Most of the anticipated settlement should occur during construction as dead loads are
applied.
Lateral Resistance
Lateral loads on the structures may be resisted by passive earth pressure developed against
the embedded faces of the foundation system and by frictional resistance between the
bottom of the foundation and the supporting subgrade soils. For footings bearing on the
dense native soil or compacted sand/structural fill, a 'bctional coefficient of 0.35 may be
used to evaluate sliding resistance developed between the concrete and the compacted
sub grade soil. Passive soil resistance may be calculated using an equivalent fluid weight of
14-052 16204 -114th Ave SE Rpt 9 PanGEO, Inc.
Geotechnical Engineering Report
Proposed Short Plat and Development: 16204 - I 14th Avenue SE, Renton, W A
June 24, 2014
300 pcf, assuming properly compacted structural fill will be placed against the footings.
The above values include a factor of safety of 1.5. Unless covered by pavements or slabs,
the passive resistance in the upper 12 inches of soil should be neglected.
Perimeter Footing Drains
Footing drains should be installed around the perimeter of the buildings, at or just below the
invert of the footings. Under no circumstances should roof downspout drain lines be con-
nected to the footing drain systems. Roof downspouts must be separately tightlined to
appropriate discharge locations. Cleanouts should be installed at strategic locations to allow
for periodic maintenance of the footing drain and downspout tightline systems.
Footing Excavation and Subgrade Preparation
All footing excavations should be trimmed neat and footing subgrades should be carefully
prepared. Any loose or softened soil should be removed from the footing excavations. The
footing subgrade may need to be recompacted to a dense, unyielding condition using a
jumping jack or other heavy compaction equipment, prior to form setting and rebar
placement. The adequacy of footing subgrade should be verified by a representative of
PanG EO, prior to placing forms or rebar. If the on-site native sandy soil is still loose and
yielding after re-compaction, they should be over-excavated to expose the bearing soil. The
over-excavation should be backfilled with compacted structural fill or lean-mix concrete.
The over-excavation width should extend at least one-half the over-excavation depth beyond
the edge of footing.
CONCRETE SLAB ON GRADE FLOORS
Concrete slab-on-grade floors may be used for the project and should be supported on on-
site silty sand compacted to a firm and unyielding condition or on newly placed structural
fill. Any loose/soft soil at the slab subgrade level should be over-excavated to expose
firm/dense soil and backfilled with compacted structural fill.
Slab-on-grade floors should be underlain by a capillary break consisting of at least of 4
inches of Y..-inch, clean crushed rock (less than 3 percent fines) compacted to a firm and
unyielding condition. The capillary break should be placed on subgrade that has been
compacted to a dense and unyielding condition. A 10-mil polyethylene vapor barrier should
14-05216204-114thAveSERpt 10 PanG EO, Inc.
Geotechnical Engineering Report
Proposed Short Plat and Development: 16204 - 1 14th Avenue SE, Renton, WA
June 24, 2014
also be placed directly below the slab. We also recommend that control joints bc
incorporated into the floor slab to control cracking.
Underslab Drains -Based on our test pits at thc site, perched groundwater seepage may be
present near the proposed finished floor elevations. As such, we recommend installing an
under-slab drainage system below the slab-on-grade floor. The under-slab drainage system
should consist of 4-inch diameter perforated drainpipes placed in narrow (one foot or less),
approximately 18-inch deep trenches (measured from the bottom of slab) spaced no more
than about 20 feet apart. The under-slab drain trenches should be backfilled with clean,
free-draining 3/8 inch minus pea gravel. Water collected in these drainpipes should be
discharged to an appropriate outlet.
CONCRETE RETAINING AND BASEMENT WALLS
Retaining and basement walls, if needed, should be properly designed to resist the lateral
earth pressures exerted by the soils behind the wall. Proper drainage provisions should also
be provided behind the walls to intercept and remove groundwater that may be present
behind the wall. Our geotechnical recommendations for the design and construction of the
retaininglbasement walls are presented below.
Lateral Earth Pressures
Concrete cantilever walls should be designed for an equivalent fluid pressure of 35 pcI' for
level backfills behind the walls assuming the walls are free to rotate. If walls are to be
restrained at the top from free movement, such as basement walls, equivalent fluid pressures
of 45 pcf should be used for level backfills behind the walls. Walls with a maximum 2H: I V
backslope should be designed for an active and at rest earth pressure of 45 and 55 pcf,
respectively.
Permanent walls should be designed for an additional uniform lateral pressure of 7H psf for
seismic loading, where H corresponds to the buried depth of the wall. The recommended
lateral pressures assume that the backfill behind the wall consists of a free draining and
properly compacted fill with adequate drainage provisions.
14-05216204 - I 14th Ave SE Rpt II PanG EO, Inc.
Geotechnical Engineering Report
Proposed Short Plat and Development: 16204 - I 14th Avenue SE, Renton, WA
June 24, 2014
Surcharge
Surcharge loads, where present, should also be included in the design of retaining walls. We
recommend that a lateral load coefficient of 0.3 be used to compute the lateral pressure on
the wall face resulting from surcharge loads located within a horizontal distance of one-half
wall height.
Lateral Resistance
Lateral forces from seismic loading and unbalanced lateral earth pressures may be resisted
by a combination of passive earth pressures acting against the embedded portions of the
foundations and by friction acting on the base of the foundations. Passive resistance values
may be determined using an equivalent fluid weight of 300 pef. This value includes a factor
of safety of 1.5, assuming the footing is poured against dense native sand, re-compacted on-
site sandy soil or properly compacted structural fill adjacent to the sides of footing. A
friction coefficient of 0.35 may be used to determine the frictional resistance at the base of
the footings. The coefficient includes a factor safety of 1.5.
Wall Drainage
Provisions for wall drainage should consist of a 4-inch diameter perforated drainpipe behind
and at the base of the wall footings, embedded in 12 to 18 inches of clean crushed rock and
pea gravel wrapped with a layer of filter fabric. A minimum 18-inch wide zone of free
draining granular soils (i.e. pea gravel or washed rock) is recommended to be placed
adjacent to the wall for the full height of the wall. Alternatively, a composite drainage
material, such as Miradrain 6000, may be used in lieu of the clean crushed rock or pea
gravel. The drainpipe at the base of the wall should be graded to direct water to a suitable
outlet.
The exterior of all basement walls should be protected with a damp proofing compound.
We also recommend the designers consider utilizing a waterproofing material, such as
prefabricated clay mats, on the exterior of all below grade walls to reduce the potential for
moisture intrusion into the below-grade portion of the building.
Wall Backfill
In our opinion, the relatively clean on-site sandy soil may be re-used as wall backfill.
Imported wall backfill, if needed, should consist of granular material, such as WSDOT
14-052 16204 -114th Ave SE Rpt 12 PanGEO, Inc.
Geotechnical Engineering Report
Proposed Short Plat and Development: 16204 -I 14th Avenue SE, Renton, W A
June 24, 2014
Gravel Borrow or approved equivalent. In areas where the space is limited between the wall
and the face of excavation, pea gravel or clean crushed rock may be used as backfill without
compaction.
Wall backfill should be moisture conditioned to within about 3 percent of optimum moisture
content, placed in loose, horizontal lifts less than 8 inches in thickness, and systematically
compacted to a dense and relatively unyielding condition and to at least 95 percent of the
maximum dry density, as determined using test method ASTM D 1557. Within 5 feet of the
wall, the backfill should be compacted with hand-operated equipment to at least 90 percent
of the maximum dry density.
WET WEATHER EARTHWORK
In our opinion, the proposed site construction may be accomplished during wet weather
(such as in winter) without adversely affecting the site stability. However, earthwork
construction performed during the drier summer months likely will be more economical.
Winter construction will require the implementation of best management erosion and
sedimentation control practices to reduce the chance of otT-site sediment transport. Some of
the site soils contain a high percentage of fines and are moisture sensitive. Any footing
subgrade soils that become softened either by disturbance or rainfall should be removed and
replaced with structural fill, Controlled Density Fill (CDF), or lean-mix concrete. General
recommendations relative to earthwork performed in wet conditions are presented below:
• Site stripping, excavation and subgrade preparation should be followed promptly by
the placement and compaction of clean structural fill or CDF;
• The size and type of construction equipment used may have to be limited to prevent
soil disturbance;
• The ground surface within the construction area should be graded to promote run-off
of surface water and to prevent the ponding of water;
Geotextile silt fences should be strategically located to control erosion and the
movement of soil;
• Structural fill should consist of less than 5% fines; and
• Excavation slopes should be covered with plastic sheets.
14-052 16204 -114th Ave SE Rpt 13 PanG EO, Inc.
Geotechnical Engineering Report
Proposed Short Plat and Development: 16204 -I 14th Avenue SE, Renton, WA
June 24, 2014
SURFACE DRAINAGE AND EROSION CONSIDERATIONS
Surface runoff can be controlled during construction by careful grading practices.
Typically, this includes the construction of shallow, upgrade perimeter ditches or low
earthen berms in conjunction with silt fences to collect runoff and prevent water from
entering excavations or to prevent runoff from the construction area from leaving the
immediate work site. Temporary erosion control may require the use of hay bales on the
downhill side of the project to prevent water from leaving the site and potential storm water
detention to trap sand and silt before the water is discharged to a suitable outlet.
Permanent control of surface water should be incorporated in the final grading design.
Adequate surface gradients and drainage systems should be incorporated into the design
such that surface runoff is directed away from structures. Potential problems associated
with erosion may also be reduced by establishing vegetation within disturbed areas
immediately following grading operations. Water form roof drains should be properly
collected and discharged.
ADDITIONAL SERVICES
To confirm that our recommendations are properly incorporated into the design and
construction of the proposed project, PanGEO should be retained to conduct a review of the
final project plans and specifications, and to monitor the construction of geotechnical
elements. The City of Renton, as part of the permitting process, will also require
geotechnical construction inspection services. PanGEO can provide you a cost estimate for
construction monitoring services at a later date.
We anticipate that the following additional services will be required:
• Review final project plans and specifications
• Monitor excavations and site stability
• Verify adequacy offoundation bearing
• Verify subsurface drainage installation (i.e. footing drains)
• Verify structural fill compaction
• Review of erosion control measures during construction
• Other consultation as may be required during construction
14-05216204 -114th Ave SE Rpt 14 PanGEO, Inc.
Geotechnical Engineering Report
Proposed Short Plat and Development: 16204 -114'h Avenue SE, Renton, W A
June 24, 2014
Modifications to our recommendations presented in this report may be necessary, based on
the actual conditions encountered during construction.
CLOSURE
We have prepared this report for use by Limelite Development and the project design team.
Recommendations contained in this report are based on a site reconnaissance, a subsurface
exploration program, a review of pertinent subsurface information, and our understanding of
the project. The study was performed using a mutually agreed-upon scope of work.
Variations in soil conditions may exist at locations away from the explorations. The nature
and extent of the soil variations may not be evident until construction occurs. If any soil
conditions are encountered at the site that are different from those described in this report,
we should be immediately notified to review the applicability of our recommendations.
Additionally, we should also be notified to review the applicability of our recommendations
ifthere are any changes in the project scope.
The scope of our work does not include services related to construction safety precautions.
Our recommendations are not intended to direct the contractors' methods, techniques,
sequences or procedures, except as specifically described in our report for consideration in
design. Additionally, the scope of our work specifically excludes the assessment of site
environmental characteristics, particularly those involving hazardous substances. We are
not mold consultants nor are our recommendations to be interpreted as being preventative of
mold development. A mold specialist should be consulted for all mold-related issues.
This report has been prepared for planning and design purposes for specific application to
the proposed project in accordance with the generally accepted standards of local practice at
the time this report was written. No warranty, express or implied, is made.
This report may be used only by the client and for the purposes stated, within a reasonable
time from its issuance. Land use, site conditions (both off and on-site), or other factors
including advances in our understanding of applied science, may change over time and
could materially affect our findings. Therefore, this report should not be relied upon after 24
months from its issuance. PanGEa should be notified if the project is delayed by more than
24 months from the date of this report so that we may review the applicability of our
conclusions considering the time lapse.
14-052 16204 -114th Ave SE Rpt 15 PanGEa, Inc.
Geotechnical Engineering Report
Proposed Short Plat and Development: 16204 -114th Avenue SE, Renton, WA
June 24, 2014
It is the client's responsibility to see that all parties to this project, including the designer,
contractor, subcontractors, etc., are made aware of this report in its entirety. The use of
information contained in this report for bidding purposes should be done at the contractor's
option and risk. Any party other than the client who wishes to use this report shall notify
PanGEO of such intended use and for permission to copy this report. Based on the intended
use of the report, PanGEO may require that additional work be performed and that an
updated report be reissued. Noncompliance with any of these requirements will release
PanGEO from any liability resulting from the use this report.
Please call if there are any questions on this report.
Sincerely,
Michael H. Xue, P.E. Siew L. Tan, P.E.
Senior Geotechnical Engineer Principal Geotechnical Engineer
Enclosures:
Figure I
Figure 2
Appendix A:
Figure A-I
Vicinity Map
Site and Exploration Plan
Summary Test Pit Logs
Figures A-2 thru A-6
Terms and Symbols for Boring and Test Pit Logs
Logs of Test Pits TP-I through TP-5
14-05216204 -114th Ave SE Rpt 16 PanGEO, Inc.
Geotechnical Engineering Report
Proposed Short Plat and Development: 16204 -114'h Avenue SE, Renton, W A
June 24, 2014
REFERENCES
Booth, D. B., Troost, K. A., and Wisher, A. P., 2007, The Geologic Map of King County,
Washington: scale 1: 100,000.
City of Renton, 2012; Sensitive Area Map: City of Renton.
International Code Council, 2012, International Building Code (lBC).
Schasse, Henry W.; Kaler, M. Lorraine; Eberle, Nancy A.; Christie, Rebecca A., 1994; The
Washington State coal mine map collection--A catalog, index, and user's guide:
Washington Division of Geology and Earth Resources Open File Report 94-7, 109 p.
WSDOT, 2014, Standard Specifications for Road, Bridges, and Municipal Construction.
14-05216204 -114th Ave SE Rpt 17 PanG EO, Inc.
"'3rd Sl
:m
~I
<$I'
. s c~'
" \\.~ -
Not to Scale
-
J ,
i5
" !If '\\"-;'\ a. .. ,.
;§
~
,--
)
• ' ?
SE>" n \~
Project Location
SE I 68th 51
.. "SE Petr()V1!sky AO
'" 3' ,..
:i S~ 184th 51
SE 13E;tto 51 'i\
"" ~.
3
1>
Nf ElII1 51 NE 6th 51 ;j
~
. N£4t" 51 -
NE 2nd 5!
Note: Basemap obtained and modified from Google Maps.
VICINITY MAP Proposed Short Plat
and Development
16204 -114th Ave SE
Renton, WA Project No
14.052
u: • '" ~
~
'-----./
;.:;
~'.'
Legend:
~
~
~
~'
i-
~ PanGEO Test Pit
TP-1
. >---A.~ ----~~--~--~S~E~1~6;2N~D;~~~ET~--~--~~~-~~~--~------------~-------~ __ -_("2r
.z:: ..
S88'29·39"E 730.79'
.-----{<iJ2}---
Property Line
--0
-,.P::3 . ' " -..J ~ ';
~
~ Drawing based on Site Survey by GeoDimentions, dated Jan 20, 2014.
Approx, Scale
1"=30'
PanGE@
,.COIIPO."T.D
Proposed Short Plat
and Development
16204 -114th Ave SE
Renton, Washington
SITE AND EXPLORATION PLAN
Pro:,ect No FI;Ju~ NIl
14-052
APPENDIX A
SUMMARY TEST PIT LOGS
RELATIVE DENSITY / CONSISTENCY
SAND/GRAVEL SILT / CLAY
De nsity SP T App rox . Relat ive Co nsiste ncy SP T Approx . Undrained Shear
N·values Densily (%) N-va lues Slre nglh (psn
Very Loose <4 <15 Very So ft <2 <25 0
Loose 4 to 10 15 ·35 Soft 2104 250 ·500
Med . Dense 1010 30 35·65 Med. Stiff 4 t08 500 ·1000
Dense 30 1050 65 ·85 Sl iff Bta 15
•
1000·2000
Very Dense ,50 85 ·100 Very St iff
•
15 1030 2000·4000
• •
Hard ,30 >4000
UNIFIED SOIL CLASSIFICATION SYSTEM
MAJOR DIVISIONS GROUP DESCRIPTIONS
Grave l
50% or more of the coarse
fraction re ta ined an the #4
sicve. Usc dua l sym bol s (eg
GP-GM) for 5% \0 12% fines.
Sa nd
50% or more of the coarse
fract ion passi ng the 14 sieve
Usc dua l symbo ls (eg. SP-SM)
for 5%to 12%fincs
: GRAVE L «5% fine s)
GRAVEL (>12% fines)
SAND «5% fines)
SAND (>12% fines)
·a;. GW. We ll 'graded GR AVE L ~ .~~.l.:~~~~~~~~~~~:~~:?:~~~:~~ ...
GM : Silly GRAVEL
GC. Clayey GRAVEL
SW . We ll ·graded SAND .......................
SP: Poorly -graded SAND .........................
SM : Si lly SAND
SC: Clayey SAND , .................................. 1*1 ......................................... .
ML : SILT
liqUid Limit < 50
Silt and Clay
50%or more pass ing '200 sieve
Liquid Limit > 50
CL • Lea n CLAY
OL : Organic SILT or CLAY ...........................
MH: Elastic SI LT
CH : Fal CLAY
Hig hly Organ ic So ils
OH: Organic SILT or CLA Y
...... ~~, PT : PEAT
Notes: ~odT~~~et~~rf~~ou~~fo~~o~~i c~;~Tfi~a~tfo~scsrs\i~~S(eSsC~?~/~~~:In~~~~~:~ol~~;r~:b~d t~es~~s hUas~~~~:xste m
conduc\ed (~s noted in the 'Other Tests' colu mn), unit descr iptions may include a classification. Please refe r to the
diSCUSSions In the repo rt text for a more comp le te descript ion of the subs uriace conditions
bt h~~:y~ggr~CrriX;g~l~s~de~h~~fi~l~r~~~~~~li~~~~n~i~~t~~~~~sd t~~~1 ~;Xsrif~een~~ ~~ ~huea~~~~tii~~~rSmate ri a l s
DESCRIPTIONS OF SOIL STRUCTURES
La ye red: Units of material distingu ished by color and /o r Fiss ured: Breaks along defined planes
co mposit ion from ma terial uni ts above and be low Slicken sided: Frac ture planes that are po li shed or glossy
Laminat ed: Layers of soil typically 0.05 to 1 mm thick , ma x. 1 cm Blocky: Angula r soil lumps that res ist breakdown
Lens: Layer of so il that pinches ou l latera ll y Disrupted : Soil that is broken and mixed
Inter layered: Alternating layers of differing so il ma ter ial Scattered: Less than one per foot
Pocket Erratic, discontinuous de posit of limited exten t Num erous: More than one per foot
Homoge neous : Soil wi th uniform co lor and com positi on th rougho ut BCN , Angle betwee n b~di ng plane and a pla ne
normal to core aXIs
COMPONENT DEFINITIONS
COMPONENT SIZE I SIEVE RANGE COMPONENT SIZE / SIEVE RANGE
Boulder :
Cobb les:
Gra ve l
> 12 inches
3 to 12 inches
Coa rse Gravel : 3 to 3/4 inches
Fine Grave l: 3/4 inches to #4 sieve
PanGE~
INCORPORA
Phone: 206 .262.0370
Sa nd
Coarse Sa nd: #410 #10 sieve (4.5 to 2.0 mm)
Medium Sa nd: #1010 #40 sieve (20 to 0.4 2 mm)
Silt
Clay
Fin e Sa nd: #40 to #200 sieve (0.42 to 0.074 mm )
0.074 to 0.002 mm
<0 .002 mm
Terms and Symbols for
Boring and Test Pit Logs
TEST SYMBOLS
for In Situ an d Laboratory Tests
listed in "Other Tests " col umn .
ATT Atte rberg limit Test
Camp Co mpa ction Tesls
Co n Co nsolidation
DD Dry Dens ity
DS Direct Shea r
%F FinesCon lent
GS Grain Size
Perm Pe rmeab ili ty
pp Pocke t Penetrometer
R-va lue
SG Specific Gravity
TV Torva ne
TXC Triax ial Compress ion
UCC Unconfined Compressio n
SYMBOLS
Sa mpl ell n Situ te st types and int erva ls
f\7l 2-in ch 00 Sp li t Spoon , SP T
~ (140-lb . hammer , 30 ' drop )
~ 3.25-i nch 00 Spil t Spoon
~ (300-l b hammer , 30" drop )
Il Non -standard penetratio n
[J test (see bo ring log for deta il s) I Thin wall (She lby) lu be
~ Grab
[] Rock core
m Vane Shea r
MONITORING WELL
'Sl Gro undwa ter Leve l at
time of drilli ng (ATD )
~ Static Groun dwate r Lev el
~~:~
MOISTURE CONTENT
Dry Dusty , dry to the touch
Moi st Damp but no visible wate r
Wet Visible free water
Figure A-1
Test Pit No. I
Approx im ate ground surface elevation (feet): 480
Surface Cond iti ons: Sod
Location: NW ure 2)
Depth (ft) Material Description
0 -2 8 to 12 inches of sod over loose to medium dense, moist, brown si lty
SAND (SM); trace grave l and occasiona l organics (Topsoil/Fi ll)
-Moderate to heavy groundwater seepage at 2 feet (perched
roundwater)
2 -7 Medium dense to dense, moist to wet, tan-gray, grave ll y si lty SAND
(SM); to of unit is weathered, iron oxide stained (Ti ll-Like De osits)
7 -8 Very dense, moist, gray, cemented SAND; (Sandstone)
Plate I below shows TP-I at
approximately 8-feet in depth
TP-2 was terminated approximately 8 feet below ground surface .
Perched groundwater was observed at 2 feet at the time of the excavation.
14-052 16204 -114th A YC S E Rpt A-2 PanG EO, Inc.
--------------------
Test Pit No.2
Approximate ground s urface e levation (feet): 4 8 1
Surface Condition s : Sod
Location: NE corner of the s ite (see Fi ure 2)
Depth (ft) Material Description
0 -5 6 to 8 inches o f sod over loose to m e dium den se , moi st, dark brown ,
s ilty SA N D/sandy SILT (SM/ML); grave l and occasiona l o rgan ic s
(Topsoil/Fi ll)
-Moderate to heavy groundwater see page a t II', to 5 feet (perched
round water)
5 -8 Medium dense to dense, moist to wet, tan-gray, gravell y si lt y SAND
(SM); top of unit is weathered, iron oxide stained (Till-Like Deposits)
-At 7 feet. inter-beds of coal and till-like so il
Plate 2 below shows TP-2 at approximate ly 8-feet in depth.
Moderate caving was observed from
arou nd I 1', to 5 fe e t.
TP-2 was terminated approx im ate ly 8 feet below ground s urface.
Pe rched g roundwate r was observed from 11'2 to 5 feet at th e tim e of th e excavation.
14 -052 16 2 04· 114111 Ave SE Rpl A-3 PanGE(), Inc.
Test Pit No.3
Approx im ate ground surface elevation (feet): 481
Surface Conditions: Sod
Location: South onion of the site (see Fi ure 2)
Depth (ft) Material Description
0 -3 8 inches of sod over loose, moist, gray-brown si lty SAND (SM);
occasiona l grave l and organ ics (Topsoil/F ill )
-Groundwater see age at I to 3 feet ( erc hed ,roundwater)
3 -7 Dense, moist, tan-gray, grave ll y si lt y SAND (SM); top of unit is
weathered, iron oxide sta in ed (Till-Like De osits)
Plate 3 below shows TP-3 at
approx im ate ly 7-feet in depth.
Moderate caving was observed
from around I Yz to 3 feet.
TP-3 was terminated
approximate ly 7 feet below
ground surface.
Perched groundwater was
observed from I to 3 feet at the
time of the excavation.
14-05 2 16204 - I 14th Ave SE Rpt A-4 PanG EO, Inc.
Test Pit No.4
Approximate g round surfac e e levation (feet): 481 y,
S urface Co ndition s: Sod
Location: NE of th e hou se (see Fioure 2)
Depth (ft) Mate rial De scription
0 -1 8 inch es of sod over loo se to me dium d en se, m oist, dark brown , s ilty
SAND/sandy SILT (SM/ML); g ra ve l and occasiona l organ ics
(To so il/Fill)
1 -8 Medium den se to den se, moi st to wet, tan-gray, g ra ve ll y si lt y SAND
(SM); top of unit is weathered, iron oxide stai ned, w ith wet sand seams
(Till-Like Deposits)
-Groundwater seepage at I to 3 leet (perched groundwater)
-From 4 to 8 leet, inte r-b e ds of coal and till-like so il
Plate 4 below sho ws TP-4 at approx im ately 8-feet in d e pth .
Plate 5 bel ow sho ws coa l ex cavated at around 6-feet in d e pth.
TP-4 was terminated approximate ly
8 leet be lo w gro und surfac e .
Pe rch e d g roundwater was observed
from I to 3 leet at the ti me 0 I' the
excavat ion_
14-052 16204 -I 14th i\ ve SE R pt A -5 PanG EO , Inc.
Test Pit No.5
Approximate g round surface e levation (feet): 480
Surface Condition s: Sod
Lo cation: SW ortion of the s ite (see F i ure 2)
Depth (ft) Material Description
0 -1 12 inches of loose, moi st, gray-brown silty SAND (SM); occasional
gravel and organics (To psoi l)
-Moderate to heavy gro undwater seepage at I to 3 feet (perched
gro und water)
-To the so uth of the tes t pit , an area drain was o bserved at a depth of
around 3 feet
I -7'12 Medium dense to den se, moi st, tan-gray, grave lly s ilty SAND (SM);
to of unit is weathered, iron oxide stai ned (Till-Like De osits)
Plate 6 below shows TP-3 at approximately 7-feet in d epth.
Moderate caving was observed from
around I to 3 feet on south s id e of
excavatio n.
TP-5 was tenninated approximately
7 V, feet be low ground s urface .
Perched groundwater was observed
from I to 3 feet at the time oCthe
excavation.
Date of Test Pit excavations: March 19 ,2014
Test Pits Logged by: NE R
14-052 16 204 -I 14th Ave SE RPl A-6 PanG EO, Inc.