HomeMy WebLinkAboutMiscDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
SUBMITTAL REQUIREMENTS
FINAL PLAT
City of Renton Planning Division
1055 South Grady Way-Renton, WA 98057
Phone: 425-430-7200 Fax: 425-430-7231
PURPOSE: To ensure the proposed land division is in accordance with City of Renton's adopted
standards and consistent with the approved Preliminary Plat. In addition, final review is used to verify
compliance with any required conditions.
COMPLETE APPLICATION REQUIRED: In order to accept your application, each of the numbered items
must be submitted at the same time. If you have received a prior written waiver of a submittal item(s),
please provide the waiver form in lieu of any submittal item not provided. All plans and attachments
must be folded to a size not exceeding 8Yz by 11 inches.
PLAT NAME: Please ensure that the final plat name is consistent with the name used for the preliminary plat
application.
APPLICATION SCREENING: Applicants are encouraged to bring in one copy of the application
package for informal review by staff, prior to making the requested number of copies, colored
drawings, or photo reductions. Please allow approximately 45 minutes for application screening.
APPLICATION SUBMITTAL HOURS: Applications should be submitted to Planning Division staff at the
6th floor counter of Renton City Hall, 1055 South Grady Way, between 8:00 A.M. and 4:00 P.M. Monday
through Friday. Please call your assigned project manager to schedule an appointment or call (425) 430-
7200 extension 4 to reach the Planning Division. Due to the screening time required, applications
delivered by messenger cannot be accepted.
All Plans and Attachments must be folded 8 Yz"by 11"
APPLICATION MATERIALS:
1.[TI Public Works Approval: Please provide confirmation that required improvements have either
been substantially installed or deferred.
2. 0 Waiver Form: If you received a waiver form, please provide 5 copies of this form.
To be provided at required pre-screen by the rcyiewer.
3. if Confirmation of Compliance with all Conditions of Plat Approval: Please provide 5 copies of a
statement detailing how all conditions of plat approval have been addressed. ·4 top.jo-\ 48"'-E\2-Q.
pnV~lc~IData?Q~teslse"HeIP HandoutslPlanninglfp.doc -1-12/13
4. [6" Plat Certificate or Title Report: Please provide 3 copies of a current Plat Certificate or Title
Report obtained from a title company documenting ownership and listing all encumbrances of
the involved parcel(s). The Title Report should include all parcels being developed, but no
pa<rcecls1t1n!,t.ar.e..!ln£ot~part of the development. If the Plat Certificate or Title Report references
recorded documents ' .. easements, dedications, covenants) 5 copies ofthe referenced
recorded document(s) must also be provided. All easements referenced in the Plat Certificate
must be located, identified by type and recording number, and dimensioned on the Site Plan.
5. ~ Land Use Permit Master Application Form: Please provide the original plus 5 copies of the
COMPLETED City of Renton Planning Division's Master Application form. Application must have
notarized signatures of ALL current property owners listed on the Title Report. If the property
owner is a corporation, the authorized representative must attach proof of signing authority on
behalf of the corporation. The legal description of the property must be attached to the
application form.
6. IH'" Environmental Checklist: You may be requested to provide 5 copies of an updated
Environmental Checklist if more than two years have elapsed since the Preliminary Plat
Approval. If a particular question on the checklist does not apply, fill in the space with "Not
Applicable."
7. ~ Post Office Approval: Please provide 2 copies ofthe Post Office confirmation that they
approved your mailbox location(s). Contact Bill Sansaver of the Post Office at (425) 255-6389 or
1-800-275-8777.
9.
amount.
10. ~eighbOrhOod Detail Map: Please provide 5 copies of a map drawn at a scale of 1" = 100' or 1"
= 200' (or other scale approved by the Planning Division) to be used to identify the site location
on public notices and to review compatibility with surrounding land uses. The map shall identify
the subject site with a much darker perimeter line than surrounding properties and include at
least two cross streets in all directions showing the location of the subject site relative to
property boundaries of surrounding parcels. The map shall also show: the property's lot lines,
lot lines of surrounding properties, boundaries of the City of Renton (if applicable), north arrow
(oriented to the top of the plan sheet), graphic scale used for the map, and City of Renton (not
King County) street names for all streets shown. Please ensure all information fits on a single
map sheet.
11.~
Kroll Map Company (206-448-6277) produces maps that may serve this purpose or you may use
the King County Assessor's maps as a base for the Neighborhood Detail Map. Additional
information (i.e. current city street names) will need to be added by the applicant.
Density Worksheet: Please submit 5 copies of a completed density worksheet for all residential
projects.
H ;ICED\Data\Forms-T em plates\Self-Help Handouts\Planning\fp .doc -2-12/13
· )
a.(/d·
{{fll..
12. D Overall Plat Plan: 1ft he scale ofthe project requires multiple plan sheets, please enclose
5 copies of the entire plat plan on a single sheet (include with final plat plan below).
13.~ Plat Plan: Please provide 5 copies of a fully-dimensioned plan prepared by a State of
Washington registered professional land surveyor in accordance with RCW 18.43.020, drawn at
a scale of 1" = 40' on an 18" x 24" plan sheet (or other size or scale approved by the Planning
Division) and including the information required by the City of Renton Subdivision Regulations:
Name of the proposed plat and space for the future City file number
Names and addresses of the engineer, licensed land surveyor, and all property
owners
Legal description of the property to be subdivided
Date, graphic scale, and north arrow oriented to the top of the paper/plan sheet
Vicinity map (a reduced version of the neighborhood detail map defined previously)
Overall plat layout with sheet key on a single page ifthe scale of the plat requires
multiple plan sheets
Drawing of the subject property with all existing and proposed property lines
dimensioned
Location of the subject site with respect to the nearest street intersections
(including driveways and/or intersections opposite the subject property), alleys and
other rights of way
Names, locations, types, widths and other dimensions of existing and proposed
streets, alleys, easements, parks, open spaces and reservations. City code requires
that private access easements be created via easement rather than creation of a
separate tract
Location and dimensions of all easements referenced in the plat certificate with the
recording number and type of easement (e.g. access, sewer, etc.) indicated
Location, distances in feet from existing and new lot lines, and dimensions of any
existing structures, existing on-site trees, existing or proposed fencing or retaining
walls, free-standing signs, and easements
Location of critical areas and any required buffer on or adjacent to the site
identified by type (e.g. floodplain, Category 1 Wetland, Class 3 Stream)
Proposed square footage of each lot. If there are any pipestem lots with access
easements or any lots with portions of the lot narrower than 80% of the minimum
required lot width, then both the total square footage and the 'net' square footage
shall be provided (per RMC 4-7-170Fl)
Certifications:
Certification by a licensed land surveyor that a survey has been made and that
monuments and stakes will be set
Certification by the responsible health agencies that the methods of sewage
disposal and water service are acceptable
Certification by the King County Finance Department that taxes have been paid in
accordance with section 1, chapter No. 188, Laws of 1927 (RCW 58.08.030 and
58.08.040) and that a deposit has been made with the King County Finance
Department in sufficient amount to pay the taxes for the following year
Certification by the City Administrative Services Administrator that there are no
delinquent special assessments and that all special assessments certified to the
Administrative Services Administrator for collection on any property herein
H:\CED\Oata\Forms-Templates\Setf-Help Handouts\Planning\fp.doc -3-12113
contained dedicated for streets, alleys or other public uses are paid in full
Certification of approval to be signed by the City Public Works Administrator
Certification of approval to be signed by the Mayor and attested by the City Clerk
~~ndscape Plan, Detailed: Please provide 3 copies of a Landscaping Plan (Detailed) meeting the
~J /' requirements of RMC 4-8-120D,
.. ilj~;; 0 Irrigation Sprinkler Plan: Please provide 3 copies of an Irrigation Plan meeting the requirements r of4-8-120D
1\\ C;../l6,f]
f'\M7,O
18, n;a/
",frO
20,E]
Deferred
21.rv/
Wetland Mitigation Plan: (Only for projects with wetlands), Please provide 3 copies of a Final
Mitigation Plan meeting the requirements of RMC 4-8-120D,
Stream and Lake Mitigation Plan: (Only for projects with streams/lakes), Please provide
3 copies of a plan meeting the requirements of RMC 4-8-120D,
Calculations: Please provide 3 copies of complete field calculations and computations noted for
the plat and details (if any) of all distances, angles, and calculations together with information
on the error of closure, The error of closure on any traverse shall not exceed l' in 10,000',
Certificate of Incorporation: Please provide 3 copies of a State of Washington, Secretary of
State Certificate of Incorporation for the plat's Homeowner's Association,
Monument Cards: When a monument(s) is installed as part of the project, please provide
2 copies of a form obtained from the City Technical Services Division and filled out by a
surveyor providing information regarding a single monument, including the Section, Township
and Range, method of location, type of mark found or set, manner of re-establishment of the
single monument (if applicable), description, and a drawing showing the location of a single
monument and indicating a reference point to that monument.
Plan Reductions: Please provide one 8)1," x 11" legible reduction of each full size plan sheet
(unless waived by your City of Renton Project Manager), The sheets that are always needed in
reduced form are: landscape plans, conceptual utility plans, site plan or plat plan, neighborhood
detail map, topography map, tree cutting/land clearing plan, critical areas plans, grading plan,
and building elevations, These reductions are used to prepare public notice posters and to
provide the public with information about the project. The quality of these reductions must be
good enough so that a photocopy of the reduced plan sheet is also legible, The reduced plans
are typically sent in PDF format to the print shop and then are printed on opaque white mylar-
type paper (aka rhino cover) to ensure legibility, If your reduced plans are not legible once
photocopied, you will need to increase the font size or try a different paper type, Illegible
reductions cannot be accepted, Please also be sure the reduced Neighborhood Detail Map is
legible and will display enough cross streets to easily identify the project location when cropped
to fit in a 4" by 6" public notice space, Once the reductions have been made, please also make
one 8)1," x 11" regular photocopy of each photographic reduction sheet, Some ofthe local
Renton print shops that should be able to provide you with reductions of your plans are Alliance
Printing (425) 793-5474, Apperson Print Resources (425) 251-1850, and PIP Printing (425) 226-
9656, Nearby print shops are Digital Reprographics (425) 882-2600 in Bellevue, Litho Design
(206) 574-3000 and Reprographics NW/Ford Graphics (206) 624-2040,
H:\CED\DataIForms-TemplateslSelf-Help Handouts\Planning\fp.doc -4-12113
All Plans and Attachments must be folded to 8Y2" by 11"
REVIEW PROCESS: Once the Final Plat application is submitted to the Planning Division, the materials
will be routed to those City departments having an interest in the application. Reviewers have
approximately two weeks to return their comments to the Planning Division. All comments and any
requests for revisions will be sent to the applicant. Once all comments have been addressed, the
applicant re-submits the revised plans and/or documents for review. The time frame for Final Plat
processing is largely dependent upon application completeness and prompt turnaround time of
revisions.
As part of the review process, the Planning and Public Works Plan Review Divisions will ensure
improvements have been installed and approved and that all conditions of the preliminary plat approval
have been met. Once the applicant has demonstrated these items have been addressed through either a
confirmation of improvement installation approval or letter of deferral, the City will schedule the Final
Plat for review by the Hearing Examiner. The Examiner will issue a decision within 14 business days
(RMC 4-8-11012c). Examiner's action to approve, modify, or reject the Final Plat shall be final and unless
the action is appealed to the City Council within 14 days of the Hearing Examiner's written report.
DEFERRAL OF IMPROVEMENTS: The Final Plat may not be recorded until all improvements have been
completed and approved by the Planning Division or a letter of deferral has been obtained. The
applicant may request a letter of deferral from the Board of Public Works and post security for any
improvements that have not been completed.
If a developer wishes to defer certain on-site improvements for more than 90 days after obtaining Final
Plat approval, then a written application shall be made to the Board of Public Works. Should the Board
of Public Works so rule, then full and complete engineering drawings shall be submitted as a condition
to the granting of any deferral. Upon approval by the Board of Public Works for such deferment, the
applicant shall thereupon furnish security to the City in the amount equal to 150% of the estimated cost
of the installation and required improvements.
Time Limits: Such security shall list the exact work that shall be performed by the applicant and
shall specify that all the deferred improvements shall be completed within the time specified by
the Board of Public Works, and if no time is specified, then no later than one year.
EXPIRATION OF FINAL PLAT: A final plat, which has not been recorded within six months after approval
by the City Council shall expire and be null and void. The plat may be resubmitted as a preliminary plat.
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\fp.doc ·5· 12/13
Parcel Map Check Report
Client:
Client
Client Company
Address I
Date: 7/30/20147:26:11 AM
Parcel Name: Site I -LOT I
Description:
Prepared by:
Preparer
Your Company Name
123 Main Street
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 169,046,6646' East: 1 ,302,254,8291'
Segment# I: Line
Course: N30° 52' 02"W Length: 18,50'
North: 169,062,5442' East: 1 ,302,245,3377'
Segment# 2: Line
Course: N 1 043' 45"W Length: 89.85'
North: 169,152.3533' East: 1,302,242,6265'
Segment# 3: Line
Course: N88° 16' 15"E Length: 50,00'
North: 169,153,8620' East: 1 ,302,292.6037'
Segment# 4: Line
Course: S 1 0 43' 45 "E Length: 91.69'
North: 169,062,2138' East: 1,302,295,3705'
Segment# 5: Curve
Length: 43,64' Radius: 126,50'
Delta: 19 045'53" Tangent: 22,04'
Chord: 43.42' Course: S69° 00' 54"W
Course In: S 11 006' 09"E Course Out: N30° 52' 02"W
RP North: 168,938,0813' East: 1,302,319.7299'
End North: 169,046,6637' East: 1,302,254.8291'
Perimeter: 293.68' Area: 4,879.75Sq.Ft.
j
~ .,
w'
,r -
Error Closure: 0.0009
Error North: -0.00088
Precision I: 326,311.11
Parcel Name: Site I -LOT 2
Description:
Course: S6° 02' 13"W
East: -0.00009
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 169, 153.8620' East: 1,302,292.6039'
Segment# I : Line
Course: N88° 16' 15 "E
North: 169,155.3708'
Segment# 2: Line
Course: Sio 43' 45"E
North: 169,065.4117'
Segment# 3: Line
Course: S88° 16' 15"W
North: 169,064.5246'
Segment# 4: Curve
Length: 20.69'
Delta: 9°22'25"
Chord: 20.67'
Course In: S I ° 43' 45"E
RP North: 168,938.0822'
End North: 169,062.2147'
Segment# 5: Line
Course: N 10 43' 45"W
North: 169,153.8629'
Perimeter: 281. 78'
Error Closure: 0.0028
Error North: 0.00090
Length: 50.00'
East: 1,302,342.5811'
Length: 90.00'
East: 1,302,345.2969'
Length: 29.40'
East: 1,302,315.9103'
Radius: 126.50'
Tangent: 10.37'
Course: S83° 35' 03"W
Course Out: Nil ° 06' 09"W
East: 1,302,319.7274'
East: 1,302,295.3680'
Length: 91.69'
East: 1 ,302,292.6012'
Area: 4,511.57Sq.Ft.
Course: N71° 23' 42"W
East: -0.00268
Precision I: 100,639.29
Parcel Name: Site I -LOT 3
Description:
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 169,155.3707' East: I ,302,342.5811'
Segment# I: Line
Course: N88° 16' 15"E
North: 169,156.8794'
Segment# 2: Line
Course: Sl o 43' 45"E
North: 169,066.9204'
Segment# 3: Line
Course: S88° 16' 15"W
North: 169,065.4116'
Segment# 4: Line
Course: N I 043' 45"W
North: 169,155.3707'
Perimeter: 280.00'
Error Closure: 0.0000
Error North: 0.00000
Precision I: 280,000,000.00
Parcel Name: Site I -LOT 4
Description:
Process segment order counterclockwise: False
Enable mapcheck across chord: False
Length: 50.00'
East: 1,302,392.5584'
Length: 90.00'
East: 1,302,395.2741'
Length: 50.00'
East: 1,302,345.2969'
Length: 90.00'
East: 1,302,342.5811'
Area: 4,500.00Sq.Ft.
Course: NO° 00' OO"E
East: 0.00000
North: 169,068.4289' East: 1,302,445.2512'
Segment# I: Line
Course: S88° 16' 15"W
North: 169,066.9202'
Segment# 2: Line
Course: Nlo 43' 45"W
North: 169,156.8792'
Segment# 3: Line
Course: N88° 16' 15"E
North: 169,158.3879'
Segment# 4: Line
Course: Sio 43' 45"E
North: 169,068.4289'
Perimeter: 280.00'
Error Closure: 0.0000
Error North: 0.00000
Precision 1: 280,000,000.00
Parcel Name: Site I -LOT 5
Description:
Process segment order counterclockwise: False
Enable mapcheck across chord: False
Length: 50.00'
East: 1 ,302,395 .2739'
Length: 90.00'
East: 1,302,392.5582'
Length: 50.00'
East: 1,302,442.5354'
Length: 90.00'
East: 1,302,445.2512'
Area: 4,500.00Sq.Ft.
Course: NO° 00' OO"E
East: 0.00000
North: 169,159.8966' East: I ,302,492.5128'
Segment# I: Line
Course: S I ° 43' 45"E
North: 169,069.9376'
Segment# 2: Line
Course: S88° 16' 15"W
North: 169,068.4288'
Segment# 3: Line
Course: Nl° 43' 45"W
North: 169,158.3878'
Length: 90.00'
East: 1 ,302,495.2286'
Length: 50.00'
East: 1,302,445.2514'
Length: 90.00'
East: 1,302,442.5356'
Segment# 4: Line
Course: N88° 16' 15"E
North: 169,159.8966'
Perimeter: 280.00'
Error Closure: 0.0000
Error North: 0.00000
Precision 1: 280,000,000.00
Parcel Name: Site 1 -LOT 6
Description:
Length: 50.00'
East: 1,302,492.5128'
Area: 4,500.00Sq.Ft.
Course: NO° 00' OO"E
East: 0.00000
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 169,068.8254' East: 1 ,302,545.2847'
Segment# 1: Curve
Length: 41.41'
Delta: 7° 15'58"
Chord: 41.38'
Course In: S5° 32' ]3"W
RP North: 168,743.8488'
End North: 169,070.2002'
Segment# 2: Line
Course: S88° 16' 15"W
North: 169,069.9373'
Segment# 3: Line
Course: Nl ° 43' 45"W
North: 169,159.8963'
Segment# 4: Line
Course: N88° 16' J5"E
North: 169,161.4051'
Segment# 5: Line
Radius: 326.50'
Tangent: 20.73'
Course: N88° 05' 46"W
Course Out: N 1 ° 43' 45 "W
East: I ,302,5 I 3.7816'
East: 1,302,503.9294'
Length: 8.71'
East: 1,302,495.2234'
Length: 90.00'
East: J ,302,492.5076'
Length: 50.00'
East: 1 ,302,542.4848'
Course: S JO 43' 45"E
North: 169,068.8273'
Perimeter: 282.73'
Error Closure: 0.0054
Error North: 0.00183
Precision 1: 52,359.26
Parcel Name: Site 1 -LOT 7
Description:
Length: 92.62'
East: 1 ,302,545.2797'
Area: 4,536.03Sq.Ft.
Course: N70° 14' 26"W
East: -0.00509
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 169,060.7166' East: 1 ,302,595.5523'
Segment# 1: Line
Course: N79° 24' 22"W
North: 169,064.7833'
Segment# 2: Curve
Length: 28.82'
Delta: 5°03'24"
Chord: 28.81'
Course In: S 10° 35' 38"W
RP North: [68,743.8485'
End North: 169,068.8251'
Segment# 3: Line
Course: N [0 43' 45"W
North: 169,161.4029'
Segment# 4: Line
Course: N88° [6' [5"E
North: 169,162.9117'
Segment# 5: Line
Course: Slo 43' 45"E
North: 169,060.7182'
Length: 22.12'
East: 1,302,573.8093'
Radius: 326.50'
Tangent: 14.42'
Course: N81° 56' 05"W
Course Out: N5° 32' 13"E
East: 1,302,513.7835'
East: 1 ,302,545.2866'
Length: 92.62'
East: 1,302,542.4918'
Length: 50.00'
East: 1 ,302,592.4691'
Length: 1 02.24'
East: 1,302,595.5542'
Perimeter: 295.80'
Error Closure: 0.0025
Error North: 0.00164
Precision I: 118,320.00
Parcel Name: Site I -LOT 8
Description:
Area: 4,851.48Sq.Ft.
Course: N48° 36' 19"E
East: 0.00186
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 169,162.9139' East: I ,302,592.4673'
Segment# I: Line
Course: N88° 16' 15"E
North: 169,163.7965'
Segment# 2: Line
Course: S29° 19' 46"E
North: 169,045.3514'
Segment# 3: Line
Course: S88° 16' 15 "W
North: 169,045.3170'
Segment# 4: Curve
Length: 15.81'
Delta: 12°19'22"
Chord: 15.78'
Course In: N1 ° 43' 45"W
RP North: 169,118.7835'
End North: 169,046.5363'
Segment# 5: Line
Course: N79° 24' 22"W
North: 169,060.7201'
Segment# 6: Line
Length: 29.25'
East: 1,302,621.7040'
Length: 135.86'
East: 1,302,688.2524'
Length: 1.14'
East: 1,302,687.1129'
Radius: 73.50'
Tangent: 7.93'
Course: N85° 34' 03"W
Course Out: S 10° 35' 38"W
East: 1 ,302,684.8950'
East: 1,302,671.3823'
Length: 77 .15'
East: 1,302,595.5473'
Course: N I 043' 4S"W
North: 169, 162.913S'
Perimeter: 361.46'
Error Closure: O.OOSI
Error North: -0.00038
Precision I: 70,872.SS
Parcel Name: Site I -LOT 9
Description:
Length: 102.24'
East: 1,302,592.4622'
Area: 6,554.50Sq.Ft.
Course: S8S o 40' IS "W
East: -0.00S08
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 168,992.3371'
Segment# I: Line
Course: N88° 16' IS"E
North: 168,993.2073'
Segment# 2: Line
Course: S29° 19' 46"E
North: 168,908.0307'
Segment# 3: Line
Course: S88° 16' IS"W
North: 168,90S.3364'
Segment# 4: Line
Course: N I ° 43' 45"W
North: 168,992.786S'
Segment# S: Curve
Length: IS.22'
Delta: 6°53'42"
Chord: 15.21'
Ea~
LeI
Ea~
1,3
Let
Em
1,3
Let
Ea~
1,3
Ler
Ea~
1,3
Ral
Tal
COl
Course In: N5° 09' 58"E
RP North: 169,118.7727'
End North: 168,992.3303'
Perimeter: 318.55'
Error Closure: 0.0070
Error North: -0.00677
Precision I: 45,505.71
Parcel Name: Site I -LOT 10
Description:
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 168,855.4956' East: I ,302,682.0939'
Segment# I: Line
Course: N6° 47' 48"W
North: 168,905.3428'
Segment# 2: Line
Course: N88° 16' 15"E
North: 168,908.0371'
Segment# 3: Line
Course: S29° 19' 46"E
North: 168,858.8492'
Segment# 4: Line
Course: S88° 16' 15"W
North: 168,855.4997'
Perimeter: 306.91'
Length: 50.20'
East: 1,302,676.1530'
Length: 89.29'
East: 1,302,765.4023'
Length: 56.42'
East: 1,302,793.0385'
Length: I II .00'
East: 1,302,682.0891'
Area: 5,007.35Sq.Ft.
53"
COl
45"
Em
1,3
Eaf
1,3
An
COl
20"
Eaf
Error Closure: 0.0064
Error North: 0.00416
Precision I: 47,954.69
Parcel Name: Site I -LOT II
Description:
Course: N49° 23' 41 "W
East: -0.00485
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 168,806.1863' East: 1,302,705.7324'
Segment# I: Line
Course: N25° 36' 46"W
North: 168,855.4933'
Segment# 2: Line
Course: N88° 16' 15"E
North: 168,858.8427'
Segment# 3: Line
Course: S29° 19' 46"E
North: 168,809.6548'
Segment# 4: Line
Course: S88° 16' 15"W
North: 168,806.1846'
Perimeter: 337.10'
Error Closure: 0.0018
Error North: -0.00172
Precision I: 187,277.78
Parcel Name: Site I -LOT 12
Description:
Length: 54.68'
East: 1 ,302,682.0949'
Length: 111.00'
East: 1,302,793.0444'
Length: 56.42'
East: 1,302,820.6806'
Length: 115.00'
East: 1,302,705.7330'
Area: 5,650.00Sq.Ft.
Course: S 19° 40' 52"E
East: 0.00062
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 168,902.9704' East: I ,302,597.6892'
Segment# 1: Line
Course: Nl° 43' 45"W
North: 169,006.9831'
Segment# 2: Line
Course: S79° 24' 22"E
North: 168,997.5738'
Segment# 3: Line
Course: S 1 043' 45"E
North: 168,904.4762'
Segment# 4: Line
Course: S88° 16' 15"W
North: 168,902.9674'
Perimeter: 298.38'
Error Closure: 0.0031
Error North: -0.00299
Precision 1: 96,251.61
Parcel Name: Site 1 -LOT 13
Description:
Length: 104.06'
East: 1 ,302,594.5491'
Length: 51.18'
East: 1 ,302,644.8568'
Length: 93.14'
East: 1 ,302,647.6673'
Length: 50.00'
East: 1 ,302,597.6900'
Area: 4,930.04Sq.Ft.
Course: S 16 0 36' 18"E
East: 0.00089
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 169,012.6872' East: 1 ,302,564.0624'
Segment# I: Line
Course: S79° 24' 22"E
North: 169,006.9843'
Segment# 2: Line
Course: SI° 43' 45"E
North: 168,902.9716'
Segment# 3: Line
Length: 31.02'
East: 1,302,594.5537'
Length: 1 04.06'
East: 1,302,597.6937'
Course: S88° 16' IS"W
North: 168,901.4629'
Segment# 4: Line
Course: Nl o 43' 45"W
North: 169,0IS.6409'
Segment# 5: Curve
Length: 20.02'
Delta: 40 II '40"
Chord: 20.02'
Course In: S6° 23' 58"W
RP North: 168,743.84S0'
End North: 169,012.6832'
Perimeter: 319.33'
Error Closure: 0.0064
Error North: -0.00394
Precision I: 49,895.31
Parcel Name: Site I -LOT 14
Description:
Length: 50.00'
East: 1,302,547.716S'
Length: 114.23'
East: 1,302,544.2696'
Radius: 273.S0'
Tangent: 10.02'
Course: S81° 30' 12"E
Course Out: NIO° 35' 38"E
East: I ,302,SI3.7855'
East: 1,302,564.0675'
Area: 5,471.23Sq.Ft.
Course: SS2° 02' 42"E
East: 0.00505
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 168,851.4846' East: 1 ,302,549.2206'
Segment# I: Line
Course: N I 043' 45"W
North: 168,901.4618'
Segment# 2: Line
Course: N88° 16' 15"E
North: 168,902.9705'
Segment# 3: Line
Course: N88° 16' 15"E
North: 168,904.4793'
Length: 50.00'
East: 1,302,547.7118'
Length: 50.00'
East: 1,302,597.6890'
Length: 50.00'
East: 1,302,647.6663'
Segment# 4: Line
Course: S 1 ° 43' 45"E
North: 168,854,5021'
Segment# 5: Line
Course: S88° 16' 15"W
North: 168,851.4846'
Perimeter: 300.00'
Error Closure: 0.0000
Error North: 0.00000
Precision 1: 300,000,000.00
Parcel Name: Site 1 -LOT 15
Description:
Length: 50.00'
East: 1 ,302,649.1750'
Length: 1 00.00'
East: 1 ,302,549.2206'
Area: 5,000.00Sq.Ft.
Course: Soo 00' OO"E
East: 0.00000
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 169,017.3131' East: 1 ,302,518.2029'
Segment# 1: Curve
Length: 26.13'
Delta: 5°28'23"
Chord: 26.12'
Course In: Soo 55' 35"W
RP North: 168,743.8489'
End North: 169,015.6447'
Segment# 2: Line
Course: S 1 ° 43' 45"E
North: 168,901.4667'
Segment# 3: Line
Course: SI° 43' 45"E
North: 168,851.4895'
Segment# 4: Line
Radius: 273.50'
Tangent: 13.07'
Course: S86° 20' 13 "E
Course Out: N6° 23' 58"E
East: 1 ,302,513.7810'
East: 1,302,544.2651'
Length: 114.23'
East: 1,302,547.7120'
Length: 50.00'
East: 1 ,302,549.2208'
Course: N88° 16' 15"E
North: 168,854.5070'
Segment# 5: Line
Course: SI° 43' 45"E
North: 168,804.5298'
Segment# 6: Line
Course: S88° 16' 15 "W
North: 168,800.7277'
Segment# 7: Line
Course: N1° 43' 45"W
North: 168,927.6499'
Segment# 8: Line
Course: N 10 43' 45 "W
North: 169,017.3190'
Perimeter: 683.05'
Error Closure: 0.0059
Error North: 0.00590
Precision 1: 115,771.19
Parcel Name: Site 1 -LOT 16
Description:
Length: 1 00.00'
East: 1 ,302,649.1752'
Length: 50.00'
East: 1 ,302,650.6840'
Length: 126.00'
East: 1 ,302,524.7414'
Length: 126.98'
East: 1 ,302,520.9097'
Length: 89.71'
East: 1,302,518.2027'
Area: 1O,607.44Sq.Ft.
Course: N 1 0 42' 15 "W
East: -0.00018
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 168,799.8988' East: 1 ,302,497.4428'
Segment# 1: Line
Course: N57° 14' 27"W
North: 168,814.7955'
Segment# 2: Line
Course: Nl 043' 45"W
North: 168,926.1448'
Length: 27.53'
East: 1,302,474.2914'
Length: 111.40'
East: 1 ,302,470.9299'
Segment# 3: Line
Course:N88° 16' 15"E
North: 168,927.6535'
Segment# 4: Line
Course: SIO 43' 45"E
North: 168,800.7314'
Segment# 5: Line
Course: S88° 16' 15 "W
North: 168,799.9073'
Perimeter: 343.22'
Error Closure: 0.0087
Error North: 0.00850
Precision 1: 39,450.57
Parcel Name: Site 1 -LOT 17
Description:
Length: 50.00'
East: 1 ,302,520.9071'
Length: 126.98'
East: 1,302,524.7387'
Length: 27.31'
East: 1,302,497.4412'
Area: 6,172.30Sq.Ft.
Course: N 1 0° 49' 49"W
East: -0.00163
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 168,926.1390' East: 1 ,302,470.9324'
Segment# I: Line
Course: Nl ° 43' 45"W
North: 169,016.0980'
Segment# 2: Line
Course: N88° 16' 15 "E
North: 169,017.2245'
Segment# 3: Curve
Length: 12.68'
Delta: 2°39'20"
Chord: 12.67'
Course In: Sio 43' 45"E
Length: 90.00'
East: 1,302,468.2166'
Length: 37.33'
East: 1 ,302,505.5296'
Radius: 273.50'
Tangent: 6.34'
Course: N89° 35' 55"E
Course Out: NO° 55' 35"E
RP North: 168,743,8490'
End North: 169,017.3133'
Segment# 4: Line
Course: SI° 43' 45"E
North: 168,927,6441'
Segment# 5: Line
Course: S88° 16' 15 "W
North: 168,926.1354'
Perimeter: 279.71'
Error Closure: 0.0041
Error North: -0.00365
Precision I: 68,224.39
Parcel Name: Site I -LOT 18
Description:
East: 1,302.513,7825'
East: 1,302,518,2044'
Length: 89.71'
East: 1,302,520,9114'
Length: 50,00'
East: 1,302,470.9342'
Area: 4,498.76Sq.Ft.
Course: S26° 15' 10"E
East: 0,00180
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 168,926.1390' East: 1,302,4 70.9324'
Segment# I: Line
Course: S88° 16' 15"W Length: 50,00'
North: 168,924.6303' East: 1,302,420,9551'
Segment# 2: Line
Course: N I 043' 45"W
North: 169,014,5893'
Segment# 3: Line
Course: N88° 16' 15"E
North: 169,016.0980'
Segment# 4: Line
Course: S I 043' 45"E
North: 168,926.1390'
Length: 90.00'
East: 1,302,418,2394'
Length: 50,00'
East: 1,302,468.2166'
Length: 90,00'
East: 1,302,470,9324'
Perimeter: 280.00'
Error Closure: 0.0000
Error North: 0.00000
Precision I: 280,000,000.00
Parcel Name: Site I -LOT 19
Description:
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 169,013.0807'
Segment# I: Line
Course: N88° 16' 15"E
North: 169,014.5895'
Segment# 2: Line
Course: SID 43' 4S"E
North: 168,924.630S'
Segment# 3: Line
Course: S88° 16' IS"W
North: 168,923.1217'
Segment# 4: Line
Course: N I D 43' 4S"W
North: 169,013.0807'
Perimeter: 280.00'
Error Closure: 0.0000
Error North: 0.00000
Precision I: 280,000,000.00
Area: 4,500.00Sq.Ft.
Course: NOD 00' OO"E
East: 0.00000
East: I ,302,368.2623'
Length: 50.00'
East:
1,302,418.2396'
Length: 90.00'
East:
1,302,420.9553'
Length: 50.00'
East:
1,302,370.9781 '
Length: 90.00'
East:
1,302,368.2623'
Area: 4,SOO.00Sq.Ft.
Course: NOD 00'
OO"E
East: 0.00000
Parcel Name: Site I -LOT 20
Description:
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 168,893.5731' East: 1 ,302,351.8608'
Segment# 1: Line
Course: N1° 43' 45"W
North: 169,012.4790'
Segment# 2: Line
Course: N88° 16' 15"E
North: 169,013.0825'
Segment# 3: Line
Course: S 1 ° 43' 45"E
North: 168,923.1235'
Segment# 4: Line
Course: N88° 16' 15 "E
North: 168,924.6322'
Segment# 5: Line
Course: N88° 16' IS"E
North: 168,926.1410'
Segment# 6: Line
Course: S 1 ° 43' 45 "E
North: 168,814.7917'
Segment# 7: Line
Course: NS7° 14' 27"W
North: 168,893.57\8'
Perimeter: 585.94'
Error Closure: 0.00 I 9
Error North: -0.00139
Length: 118.96'
East: 1,302,348.2711'
Length: 20.00'
East: 1,302,368.2620'
Length: 90.00'
East: 1,302,370.9778'
Length: 50.00'
East: 1 ,302,420.9550'
Length: 50.00'
East: 1 ,302,470.9323'
Length: 111 .40'
East: 1,302,474.2938'
Length: 145.59'
East: 1,302,351.8595'
Area: 10,221.23Sq.Ft.
Course: S42° 39' 30"W
East: -0.00128
Precision I: 308,394,74
Parcel Name: Site I -LOT 21
Description:
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 168,893.5731' East:I,302,351.8608'
Segment# I: Line
Course: N57° 14' 27"W
North: 168,936.5101'
Segment# 2: Line
Course: N I ° 43' 45"W
North: 169,001.8404'
Segment# 3: Curve
Length: 36.06'
Delta: 28°06'24"
Chord: 35.70'
Course In: S29° 50' 09"E
RP North: 168,938.0825'
End North: 169,011.5490'
Segment# 4: Line
Course: N88° 16' 15 "E
North: 169,012.4775'
Segment# 5: Line
Course: S I ° 43' 45"E
North: 168,893.5717'
Perimeter: 330.49'
Error Closure: 0.0068
Error North: -0.00148
Precision 1: 48,602.94
Length: 79.35'
East: 1,302,285.1312'
Length: 65.36'
East: 1,302,283.1590'
Radius: 73.50'
Tangent: 18.40'
Course: N74° 13' 03"E
Course Out: N I ° 43' 45"W
East: 1,302,319.7264'
East: 1,302,317.5086'
Length: 30.77'
East: 1,302,348.2645'
Length: 118.96'
East: 1 ,302,351.8542'
Area: 6,213.16Sq.Ft.
Course: S77° 23' 16"W
East: -0.00660
Parcel Name: Site I -RIGHT OF WA Y
Description:
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 168,799.8988' East: 1,302,497.4428'
Segment# I: Line
Course: S88° 16' 15"W
North: 168,799.4724'
Segment# 2: Line
Course: N57° 14' 27"W
North: 169,051.11S2'
Segment# 3: Curve
Length: 141.00'
Delta: 18°0 1'10"
Chord: 140.42'
Course In: N32° 4S' 33"E
RP North: 169,428.1478'
End North: 169,144.6541'
Segment# 4: Line
Course: N88° 16' IS"E
North: 169,144.9601'
Segment# 5: Curve
Length: 132.32'
Delta: 17° 13'00"
Chord: 131.82'
Course In: N49° 58' 33"E
RP North: 169,428.1474'
End North: 169,057.8424'
Segment# 6: Line
Course: S57° 14' 27"E
North: 169,003.1633'
Length: 14.13'
East: 1 ,302,483.3192'
Length: 465.05'
East: 1 ,302,092.2343'
Radius: 448.34'
Tangent: 71.09'
Course: N48° 13' 52"W
Course Out: S50° 46' 43"W
East: 1 ,302,334.8351'
East: 1,301,987.5023'
Length: 1 0.14'
East: 1,301,997.6377'
Radius: 440.34'
Tangent: 66.66'
Course: S48° 37' S7"E
Course Out: S32° 4S' 33"W
East: 1 ,302,334.8383'
East: 1 ,302,096.5664'
Length: 101.0S'
East: 1,302,181.5446'
Segment# 7: Curve
Length: 38.45'
Delta: 88°07'31 "
Chord: 34.77'
Course In: N32° 45' 33"E
RPNorth: 169,024.1871'
End North: 169,009.9789'
Segment# 8: Curve
Length: 54.09'
Delta: 24029'56"
Chord: 53.68'
Course In: S55° 21' 58"E
RP North: 168,938.0851'
End North: 169,046.6674'
Segment# 9: Curve
Length: 43.64'
Delta: 19°45'53"
Chord: 43.42'
Course In: S30° 52' 02"E
RP North: 168,938.0851'
End North: 169,062.2175'
Segment# 10: Curve
Length: 20.69'
Delta: 9°22'25"
Chord: 20.67'
Course In: S II 0 06' 09"E
RP North: 168,938.0851'
End North: 169,064.5275'
Segment# 11: Line
Course: N88° 16' 15 "E
North: 169,065.4146'
Segment# 12: Line
Radius: 25.00'
Tangent: 24.20'
Course: N78° 41' 47"E
Course Out: S55° 21' 58"E
East: 1 ,302, 195.0723'
East: 1,302,215.6423'
Radius: 126.50'
Tangent: 27.46'
Course: N46° 53' OO"E
Course Out: N30° 52' 02"W
East: 1,302,319.7266'
East: 1,302,254.8257'
Radius: 126.50'
Tangent: 22.04'
Course: N69° 00' 54"E
Course Out: NIl 0 06' 09"W
East: 1,302,319.7266'
East: 1,302,295.3671'
Radius: 126.50'
Tangent: 10.37'
Course: N83° 35' 03"E
Course Out: N I 043' 45"W
East: 1,302,319.7266'
East: 1,302,315.9094'
Length: 29.40'
East: 1,302.345.2960'
Course: N88° 16' 15"E
North: 169,066.9234'
Segment# 13: Line
Course: N88° 16' 15"E
North: 169,068.4321'
Segment# 14: Line
Course: N88° 16' 15 "E
North: 169,069.9409'
Segment# 15: Line
Course: N88° 16' 15 "E
North: 169,070.2037'
Segment# 16: Curve
Length: 41.41 '
Delta: 7° 15'58"
Chord: 41.3 8'
Course In: S 1 ° 43' 45"E
RP North: 168,743.8524'
End North: 169,068.8290'
Segment# 17: Curve
Length: 28.82'
Delta: 5°03'24"
Chord: 28.81'
Course In: S5° 32' 13"W
RP North: 168,743.8524'
End North: 169,064.7872'
Segment# 18: Line
Course: S79° 24' 22"E
North: 169,060.7205'
Segment# 19: Line
Course: S79° 24' 22"E
North: 169,046.5367'
Length: 50.00'
East: 1,302,395.2733'
Length: 50.00'
East: 1 ,302,445.2505'
Length: 50.00'
East: 1 ,302,495.2277'
Length: 8.71'
East: 1 ,302,503.9338'
Radius: 326.50'
Tangent: 20.73'
Course: S88° 05' 46"E
Course Out: N 5° 32' 13 "E
East: 1 ,302,513.7859'
East: 1 ,302,545.2891'
Radius: 326.50'
Tangent: 14.42'
Course: S81 ° 56' 05 "E
Course Out: N10° 35' 38"E
East: 1 ,302,513.7859'
East: 1 ,302,573.8118'
Length: 22.12'
East: 1 ,302,595.5548'
Length: 77.15'
East: 1 ,302,671.3898'
Scgment# 20: Curve
Length: 15.81'
Delta: 12° 19'22"
Chord: 15.78'
Course In: N I 0° 35' 38"E
RP North: 169,118.7839'
End North: 169,045.3174'
Segment# 21 : Line
Course: N88° 16' 15"E
North: 169,045.3518'
Segment# 22: Line
Course: S29° 19' 46"E
North: 168,993.2084'
Segment# 23: Line
Course: S88° 16' 15 "W
North: 168,992.3381'
Segment# 24: Curve
Length: 15.22'
Delta: 6°53'42"
Chord: 15.21'
Course In: N I ° 43' 45"W
RPNorth: 169,118.7805'
End North: 168,992.7944'
Segment# 25: Curve
Length: 11.98'
Delta: 5°25'40"
Chord: 11.98'
Course In: N5° 09' 58"E
RP North: 169,118.7805'
End North: 168,994.4367'
Segment# 26: Line
Radius: 73.50'
Tangent: 7.93'
Course: S85° 34' 03"E
Course Out: SID 43' 45"E
East: 1,302,684.9025'
East: 1,302,687.1203'
Length: 1.14'
East: 1,302,688.2598'
Length: 59.81'
East: 1,302,717.5566'
Length: 28.84'
East: 1,302,688.7297'
Radius: 126.50'
Tangent: 7.62'
Course: N88° 16' 53 "W
Course Out: S5° 09' 58"W
East: 1,302,684.9126'
East: 1,302,673.5221'
Radius: 126.50'
Tangent: 6.00'
Course: N82° 07' 12"W
Course Out: S 10° 35' 38"W
East: 1,302,684.9126'
East: 1,302,661.6560'
Course: N79° 24' 22"W
North: 168,997.5768'
Segment# 27: Line
Course: N79° 24' 22"W
North: 169,006.9861'
Segment# 28: Line
Course: N79° 24' 22"W
North: 169,012.6890'
Segment# 29: Curve
Length: 20.02'
Delta: 4° II '40"
Chord: 20.02'
Course In: S 10° 35' 38"W
RP North: 168,743.8508'
End North: 169,015.6466'
Segment# 30: Curve
Length: 26.13'
Delta: 5°28'23"
Chord: 26.12'
Course In: S6° 23' 58"W
RP North: 168,743.8508'
End North: 169,017.3151'
Segment# 31: Curve
Length: 12.68'
Delta: 2°39'20"
Chord: 12.67'
Course In: SO° 55' 35"W
RP North: 168,743.8508'
End North: 169,017.2263'
Segment# 32: Line
Course: S88° 16' 15"W
North: 169,016.0998'
Length: 17.08'
East: 1,302,644.8671'
Length: 51.18'
East: 1,302,594.5595'
Length: 31.02'
East: 1,302,564.0682'
Radius: 273.50'
Tangent: 10.02'
Course: N81° 30' 12"W
Course Out: N6° 23' 58"E
East: 1 ,302,513.7862'
East: 1 ,302,544.2703'
Radius: 273.50'
Tangent: 13.07'
Course: N86° 20' 13"W
Course Out: NO° 55' 35"E
East: 1 ,302,513.7862'
East: 1 ,302,518.2081'
Radius: 273.50'
Tangent: 6.34'
Course: S89° 35' 55"W
Course Out: Nl° 43' 45"W
East: 1,302,513.7862'
East: 1 ,302,505.5333'
Length: 37.33'
East: 1 ,302,468.2203'
Segment# 33: Line
Course: S88° 16' 15 "W
North: 169,014.5911'
Segment# 34: Line
Course: S88° 16' 15 "W
North: 169,013.0823'
Segment# 35: Line
Course: S88° 16' 15"W
North: 169,012.4788'
Segment# 36: Line
Course: S88° 16' 15"W
North: 169,011.5503'
Segment# 37: Curve
Length: 36.06'
Delta: 28°06'24"
Chord: 35.70'
Course In: S 1 ° 43' 45"E
RP North: 168,938.0838'
End North: 169,001.8417'
Segment# 38: Curve
Length: 27.63'
Delta: 21°32'24"
Chord: 27.47'
Course In: S29° 50' 09"E
RP North: 168,938.0838'
End North: 168,983.9635'
Segment# 39: Curve
Length: 41.83'
Delta: 95°51 '55"
Chord: 37.12'
Course In: S51 ° 22' 32"E
Length: 50.00'
East: 1 ,302,418.2431'
Length: 50.00'
East: 1 ,302,368.2659'
Length: 20.00'
East: 1,302,348.2750'
Length: 30.77'
East: 1,302,317.5190'
Radius: 73.50'
Tangent: 18.40'
Course: S74° 13' 03"W
Course Out: N29° 50' 09"W
East: 1,302.319.7368'
East: 1 ,302,283.1694'
Radius: 73.50'
Tangent: 13.98'
Course: S49° 23' 40"W
Course Out: N51 ° 22' 32"W
East: 1,302,319.7368'
East: 1,302,262.3147'
Radius: 25.00'
Tangent: 27.70'
Course: S9° 18' 30"E
Course Out: S32° 45' 33"W
RP North: 168,968.3581'
End North: 168,947.3343'
Segment# 40: Line
Course: S57° 14' 27"E
North: 168,936.5067'
Segment# 41 : Line
Course: S57° 14' 27"E
North: 168,893.5697'
Segment# 42: Line
Course: S5T 14' 27"E
North: 168,814.7897'
Segment# 43: Line
Course: S57° 14' 27"E
North: 168,799.8930'
Perimeter: 2,235.14'
Error Closure: 0.0191
Error North: -0.00583
Precision I: 117,025.65
Parcel Name: Site 1 -TRACT A
Description:
East: 1,302,281.8460'
East: 1,302,268.3183'
Length: 20.0 I'
East: 1 ,302,285.1457'
Length: 79.35'
East: 1 ,302,35 1.8753'
Length: 145.59'
East: 1,302,474.3096'
Length: 27.53'
East: 1 ,302,497.461 0'
Area: 31,915.23Sq.Ft.
Course: sn° 13' 42"E
East: 0.01820
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 169,144.9580' East: 1 ,301 ,997.6393'
Segment# I: Line
Course:N88° 16' 15"E
North: 169,152.3539'
Segment# 2: Line
Course: S I ° 43' 45"E
North: 169,062.5448'
Length: 245.10'
East: 1,302,242.6277'
Length: 89.85'
East: 1,302,245.3389'
Segment# 3: Line
Course: S30° 52' 02"E
North: 169,046.6652'
Segment# 4: Curve
Length: 54.09'
Delta: 24°29'56"
Chord: 53.68'
Course In: S30° 52' 02"E
RP North: 168,938.0829'
End North: 169,009.9767'
Segment# 5: Curve
Length: 38.45'
Delta: 88°07'31 "
Chord: 34.77'
Course In: N55° 21' 58"W
RP North: 169,024.1849'
End North: 169,003.1611'
Segment# 6: Line
Course: N57° 14' 27"W
North: 169,057.8402'
Segment# 7: Curve
Length: 132.32'
Delta: 17°13'00"
Chord: 131.82'
Course In: N32° 45' 33"E
RP North: 169,428.1452'
End North: 169,144.9578'
Perimeter: 679.36'
Error Closure: 0.0030
Error North : -0.00018
Precision I: 226,453.33
Length: 18.50'
East: 1,302,254.8303'
Radius: 126.50'
Tangent: 27.46'
Course: S46° 53' OO"W
Course Out: N55° 21' 58"W
East: 1,302,319.7312'
East: 1,302,215.6469'
Radius: 25.00'
Tangent: 24.20'
Course: S78° 41' 47"W
Course Out: S32° 45' 33 "W
East: 1,302,195.0769'
East: 1,302,181.5492'
Length: 101.05'
East: 1,302,096.5710'
Radius: 440.34'
Tangent: 66.66'
Course: N48° 37' 57"W
Course Out: S49° 58' 33"W
East: 1,302,334.8429'
East: 1,301,997.6423'
Area: 23,772.91 Sq.Ft.
Course: S86° 32' 40"E
East: 0.00304
Parcel Name: Site I -TRACT B
Description:
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 168,936.5077' East: I ,302,285.1349'
Segment# I: Line
Course: N57° 14' 27"W
North: 168,947.3353'
Segment# 2: Curve
Length: 41.83'
Delta: 95 051 '55"
Chord: 37.12'
Course In: N32° 45' 33 "E
RP North: 168,968.3591'
End North: 168,983.9644'
Segment# 3: Curve
Length: 27.63'
Delta: 21 032'24"
Chord: 27.47'
Course In: S51 022' 32"E
RP North: 168,938.0848'
End North: 169,001.8427'
Segment# 4: Line
Course: S I 043' 45"E
North: 168,936.5124'
Perimeter: 154.83'
Error Closure: 0.0063
Error North: 0.00474
Precision I: 24,576.19
Length: 20.0 I'
East: 1,302,268.3075'
Radius: 25.00'
Tangent: 27.70'
Course: N9° 18' 30"W
Course Out: N51 022' 32"W
East: 1,302,281.8352'
East: 1,302,262.3038'
Radius: 73.50'
Tangent: 13.98'
Course: N49° 23' 40"E
Course Out: N29° 50' 09"W
East: 1,302,319.7260'
East: 1,302,283.1586'
Length: 65.36'
East: 1,302,285.1308'
Area: 1,21 0.25Sq.Ft.
Course: N41° 02' 59"W
East: -0.00413
Parcel Name: Site I -TRACT C
Description:
Process segment order counterclockwise: False
Enable mapcheck across chord: False
North: 168,806, 1863' East: I ,302,705,7324'
Segment# I: Line
Course: S88° 16' 15 "W
North: 168,804,5246'
Segment# 2: Line
Course: N1° 43' 45"W
North: 168,854,5018'
Segment# 3: Line
Course: N1 ° 43' 45"W
North: 168,904.4791'
Segment# 4: Line
Course: N1° 43' 45"W
North: 168,997.5767'
Segment# 5: Line
Course: S79° 24' 22"E
North: 168,994.4366'
Segment# 6: Curve
Length: 11.98'
Delta: 5°25'40"
Chord: 11,98'
Course In: N 1 0° 35' 38"E
RP North: 169,118.7804'
End North: 168,992.7942'
Segment# 7: Line
Course: S 1 ° 43' 45"E
North: 168,905.3441'
Segment# 8: Line
Length: 55.07'
East: 1 ,302,650,6875'
Length: 50,00'
East: 1 ,302,649.1787'
Length: 50,00'
East: 1 ,302,647.6699'
Length: 93,14'
East: 1,302,644,8594'
Length: 17.08'
East: 1 ,302,661,6483'
Radius: 126.50'
Tangent: 6,00'
Course: S82° 07' 12"E
Course Out: S5° 09' 58"W
East: 1,302,684.9049'
East: 1,302,673.5144'
Length: 87.49'
East: 1 ,302,676, 1544'
Course: S6° 47' 48"E
North: 168,855.4969'
Segment# 9: Line
Course: S25° 36' 46"E
North: 168,806.1899'
Perimeter: 469.65'
Error Closure: 0.0036
Error North: 0.00357
Precision 1: 130,455.56
Length: 50.20'
East: 1 ,302,682.0954'
Length: 54.68'
East: 1,302,705.7328'
Area: 6,304.09Sq.ft.
Course: N7° 14' 50"E
East: 0.00045
PLAT NAME RESERVATION CERTIFICATE
TO; ALISON CONNER
846 ~ 1 08TH AVE. NE. #200
BELLEVUE. WA 98004
PLAT RESERVATION EFFECTIVE DATE: Augus15.2014
The plat name. LAROSA has been reserved for future use by GReENLEAF ~ I AROSA LLG.
I certify thai I have checked the records of previously issued and reserved pial ndmes The requested name has not
been previously used In King County nor is it currently reserved by any party
This leservatlon will expire August S, 2015. one year from today. It may be renewed one year at a lime. If Ihe plat has
not been recorded or the reservation renewed by the above date it will be deleted.
(' i • J., .. -...t...
Deputy Auditor
LAROSA
Technicallnformati on Report
. Februal} 11. 2014
ReVIsed: April 15. 2014
Prepared for
846-108th A Conner Homes venue NE Bell . Suite 200
evue. WA 98004
www.esmcivill.com
February 11, 2014
Re~sed:ApriI15,2014
Approved By:
City of Renton
TECHNICAL INFORMAll0N REPORT
FOR
LAROSA
Prepared for:
Conner Homes
846-1 oath Avenue NE, Suite 200
Bellevue, WA 9a004
Prepared by:
ESM Consulting Engineers
33400 ath Avenue S, Suite 205
FederalWa~WA 9a003
Job No. 1670-004-013
Date
TABLE OF CONTENTS
1. PROJECT OVERVIEW ................................................................................................................................................................................. 1-1
2. CONDInONS AND REQUIREMENTS SUMMARy.................................................................................................... :2-1
3. OFF-SITE ANALySiS .................................................................................................................................................................................... :3-1
4. FLOW CONTROL & WATER QUALITY FACIUTY ANALYSIS AND DESiGN ............................. 4-1
5. CONVEYANCE SYSTEM ANALYSIS AND DESIGN .............................................................................................. 5-1
6. SPECIAL REPORTS AND STUDIES ........................................................................................................................................... 6-1
7. OTHER PERMITS .............................................................................................................................................................................................. ~7-1
8. CSWPPP ANALYSIS AND DESIGN ............................................................................................................................................. 13-1
9. BOND QUANTITIES, FACIUTY SUMMARIES, AND DECLARATION OF COVENANT... !H
10. OPERATIONS AND MAINTENANCE MANUAL............................................................................................................ '10-1
UST OF FIGURES
1.1 Vicinity Map
1.2 Existing Site Conditions
1.3 Proposed Site Conditions
1.4 Soils Map
3.1 KCGIS Parcel Reports/Environmental Hazards
3.2 Offsite Analysis Downstream Rowpath
4.1 Pond Predeveloped/Developed Tributary Areas
Appendix A:
Appendix B:
AppendixC:
Appendix D:
Appendix E:
Appendix F:
APPENDIX
KCRTS Pond Sizing Output
Geotech Reports prepared by Earth Solutions NW
Conveyance Analysis
Operations and Maintenance Manual
Bond Quantity WorksheeVDeclaration of CovenanVFacility Summary
StormRlter Manhole and StormGate Calculations and Worksheets.
1. PROJECT OVERVIEW
The proposed laRosa Project is a 21-lot plat located between S 27 th Street and S 29th
Street in the City of Renton. WA The project is 4.15 acres in size and incorporates four
parcels numbered 008700-0070, 00B700-0075, 00B700-00BO, and 00B700-00B1, all of
which are zoned R-B. See Rgure 1.1 for the Vicinity Map.
The existing site consists of two single-family dwellings with gravel driveways and a few
small structures. All structures on site will be demolished. The existing Site is relatively
fiat (mean slope of about 7%, 10% max slopes on site) and slopes down generally from
the southeast comer of the property towards the northwest. The pervious portions of the
parcels are generally lawn except the northwest comer of the site, which is forested. See
Rgure 1.2 for the Existing Site Conditions.
The proposed 4.15 acre project site consists of 21 residential lots and one storm
drainage tract. All 21 residential lots will have new single-family dwelling units. The
project is zoned R-B and the lots will be 4,500 SF minimum. For access, the project will
construct a road through the project, extending S 2Bth Street (on the east side of the
project) to a new intersection at Benson Road S. See Rgure 1.3 for the Proposed Site
Conditions.
The stormwater detention will be provided with a detention pond in the storm facility tract
located in the northwest comer of the site. Water quality will be provided with a
Storm Filter Manhole, following the detention pond. The detention pond/StormRlter will
discharge to the northwest to an existing large roadside ditch in Benson Road S in the
project frontage. See Section 3 for the Level 1 Downstream Analysis.
According to the Geotech Report by Earth Solutions NW, the soils on site are
predominantly native weathered and unweathered glacial till deposits. See Rgure 1.4 for
the Soils Map.
Based on the City of Renton's Row Control Application Map, the project site is in the Row
Control Duration Standard (Forested Conditions) area. The site requires basic water
quality treatment. The project will be subject to Full Drainage Review per the City of
Renton 2009 Surface Water Design Manual Amendments and the 2009 King County
Surface Water Design Manual (2009 KCSWDM). The City of Renton 2009 Surface Water
Design Manual Amendment and the 2009 KCSWDM will collectively be referred to as the
"2009 Surface Water Design Manual".
1-1
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER
Project Owner Conner Homes
Phone ________________________ __
Address 846-108th Ave NE, Suite 200
Bellevue, WA 98004
Project Engineer Brianne Gastfield, PE
Company ESM Consulting Engineers
Phone 253 -83 8 -6113
Part 3 TYPE OF PERMIT APPLICATION
• Landuse Services
~ / Short Subd, / UPD
D Building Services
M/F / Commerical / SFR
D Clearing and Grading
D Right-of-Way Use
D Other
PartS PLAN AND REPORT INFORMATION
Technical Information Report
Type of Drainage Review <@)/ Targeted
(circle): Large Site
Date (include revision
dates):
Date of Final: N/A
Part 6 ADJUSTMENT APPROVALS
/
Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Name .=L"'a"'R.:c0'-'s=-a"---____________ _
DDES Permit # __________________ _
Location Township _2 __ 3_N ______ _
Range ~5=E __________ _
Section _2=--9 __________ _
Site Address 2724 Benson Road S
Renton, WA 98055
Part 4 OTHER REVIEWS AND PERMITS
D DFWHPA
D COE404
D DOE Dam Safety
D FEMA Floodplain
D COE Wetlands
D Other
D Shoreline
Management
• Structural
~aultJ __
D ESA Section 7
Site Improvement Plan (Engr. Plans)
Type (circle one): @/ Modified
Small Site
/
Date (include revision
dates):
Date of Final: N/A
Type (circle one): Standard / Complex / Preapplication / Experimental/ Blanket
Description: (include conditions in TIR Section 2)
N/A
Date of Approval:
2009 Surface Water Design Manual
2
1/912009
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes/(§) Describe:
Start Date:
Completion Date:
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan , --'S'70"-'o"-'s"----c=r"'e"'e'-'k~ ______ _
Special District Overlays: _______________________ _
Drainage Basin: Black River
Stormwater RequirementsFlow Control Duration Standard (Forested) (Basic We;;
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
DRiver/Stream ________ _ o Steep Slope ________ _
o Lake o Erosion Hazard _______ _ o Wetlands __________ _ o Landslide Hazard ______ _ o Closed Depression _______ _ o Coal Mine Hazard ______ _
o Floodplain ----------o Seismic Hazard _______ _ o Other __________ _ o Habitat Protection ______ _
0 ________ _
Part 10 SOILS
Soil Type Slopes Erosion Potential
Alderwood 6% to 15%
o High Groundwater Table (within 5 feet) o Sole Source Aquifer o Other o Seeps/Springs
o Additional Sheets Attached
2009 Surface Water Design Manual
3
1/9/2009
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE LIMITATION / SITE CONSTRAINT
• Core 2 -Offsite Anal~sis
o Sensitive/Critical Areas
o SEPA
o Other
0
o Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area)
Threshold Discharge Area:
(name or description)
Existing Roadside Ditch
Core Requirements (all 8 apply)
DischarQe at Natural Location Number of Natural DischarQe Locations: 1
Offsite Analysis Level: (2)/2/3 dated: Sel2tember 19, 2013
Flow Control Level: 1 lq;l 3 or Exemption Number
(incL facility summary sheet) Small Site BMPs
Conveyance System Spill containment located at:
Erosion and Sediment Control ESC Site Supervisor: John Peterson
Contact Phone: 425-646-9280
After Hours Phone:
Maintenance and Operation Responsibility: Private ~
If Private, Maintenance Loo Required: Yes /No
Financial Guarantees and Provided: Yes /@
Liability
Water Quality Type: _~/ Sens. Lake / Enhanced Basicm / Bog
(include facility summary sheet) or Exemption No.
Landscape Manaqement Plan: Yes / No
Special Requirements (as applicable)
Area Specific Drainage Type: CDA / SDO / MDP / BP / LMP / Shared Fac. I None
Requirements Name:
Floodplain/Floodway Delineation Type: Major I Minor I Exemption / ~
100-year Base Flood Elevation (or range):
Datum:
Flood Protection Facilities Describe: N/A
Source Control Describe landuse: N/A
(commJindustriallanduse) Describe any structural controls:
2009 Surface Water Design Manual 119/2009
4
KING COUNTY. WASHINGTON. SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Oil Control High-use Site: Yes Q-!V
Treatment BMP:
Maintenance Agreement: Yes <!'§:)
with whom?
Other Drainage Structures
Describe:StormFilter Manhole willb e used for Water Quality
following detention. A Stormgate flow splitting structure
will be used to route hiqh flows around the StormFilter.
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION AFTER CONSTRUCTION
• Clearing Limits • Stabilize Exposed Surfaces
• Cover Measures • Remove and Restore Temporary ESC Facilities
• Perimeter Protection • Clean and Remove All Silt and Debris, Ensure
• Traffic Area Stabilization Operation of Permanent Facilities
• Sediment Retention • Flag Limits of SAO and open space
• Surface Water Collection
preservation areas o Other o Dewatering Control
• Dust Control
• Flow Control
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Flow Control Type/Description Water Quality Type/Description
• Detention
Basic/,Pond o Biofiltration
o Infiltration o Wetpool
o Regional Facility • Media Filtration ~asic/StormFilter
o Shared Facility o Oil Control
o Flow Control o Spill Control
BMPs o Flow Control BMPs D Other o Other
2009 Surface Water Design Manual
5
11912009
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 15 EASEMENTSrrRACTS Part 16 STRUCTURAL ANALYSIS
III Drainage Easement o Cast in Place Vault
II Covenant D Retaining Wall
D Native Growth Protection Covenant • Rookery> 4' High
• Tract D Structural on Steep Slope
D Other D Other
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site, Actual site conditions as observed were
incorporat into this worksheet and the attached Technicallnfonmation Report, To the best of my
knowledg e information provided e is a~lfI'ate
2009 Surface Water Design Manual 119/2009
6
5 27TH Sf
Rgure 1.1
Vicinity Map
1-2
n
Figure 1.2
ExIsting Site Conditions
1·3
Cll
<!) o
([
Cll
..J
l
-'I--,----
A PORTION OF THE NW 1/4 OF SECTION 29, TWP. 23 N .. RGE. 5 E, KING COUNTY, WA
P.L}'j
1C)7Z)::'IC1C~"::::
S 27TH STREET
\1\\
\
~'L'(I.17·IC c.=::
I
I i
L_
_ 1"_,,, ------
I, e~r'c',~,r.1llc -'1.,1' 1 _____ -+_::: ---'-";";';'"
:'l,i-, :.JJGe c,~ r l._ ~ .• ,!~ •. c,.,,~.,.,.,;,e.,
.' . ", ';::>:0" ", !,,,,~,
, :::c" . ~~S •. ·:i . . .... "~~,.~:,,.!. --,
·"w, """~~~'~~~~~~:~
PARCELC
C<.liC-OCtX80
~~~·1<2Q':.....:. 5-fl_·.~_:+:-'-~_~-~ ·t ....
, ,
-~ I ~
I
i
Is 28TH ST
EXCEPTIONS FROM TITLE REPORT
~. ~,,,"'~ ~.~.
"'-, ........
~.'.,'.'~
,,.,,.,,._.//," '·:',·:;-:;,,'3 "
_D\E\\AY • -'.~ <.~~ '. ' .. ~"''t' I
SURVEY INSTRUMENTATION
~,~'~25\~,:'~g ~~::g~g~? /;1: cg;:;i~;~I~l~~ W lH lH'S r.LAT J-'_
w"' TOTAL STATIO" MAlljTf\J'IED TJ
P[C\.'PE) 9' "'AC-3,,~_1 \'-'-IIiD
BASIS OF BEARINGS
VERTICAL DATUM
PARCELB
OOC"OCC~-,
-',---
.=~\=:.~ _.
I
(~.i_
·1
!
~-\'
.. ,.-: ..
,. ~ \'~'"
J i<
~
->'~
<P , , ,,~~R~;:,\ ~~
' .... _-..,-----~5S·1f'/O'· E .: --~ ,
53-'0
"E'io~OOL~·6B~S/~·'~~;~~)~lLL~_. ~_G0_6_-~"_006 ..
~:n~'g~,~r'~~E~u;S F~FLD\\:~V\E,7_E1~~IO:0.' JP.<"[Y MEET I'C o~ [·CE'DIIG ~~'~[) ~~4t\:?'i:~~~ED T~ ell' OF ~oNT01' Y(RT,(Al COI,TPJ" 1A(l"Jf.iINI
"C."!;:r~,.t";.:,~',,, !R PEII ~'JI,
TY ''''''''''itG
B' ~ """'iWM Plclnnln::J,'B,",II~In9 -, .,tl,c
P(V'SIGI,I
n
SCALE: 1" _ 50'
5~
CONTOUR INTERVAL_I'
LEGEf',I[) __
~-
@
(IIECKfD Fe,"
1)
&
" CJ
'"
LaRosa
EXISTING CONDITIONS
"'04/15/201
"'EX-01
FIgure 1.3
Proposed Site Conditions
\-5
n
.;~
11
I
/ §~
i~
\
\
'" -"" ~~
~
A PORTION OF THE NW 1/4 OF SECTION 29, TWP. 23 N., RGE. 5 E, KING COUNTY, WA
S 27TH STREET
(RESDENllAlACCES5)
" :'~~~
~
L
-NORTH
ALLEY
1_-
\
LEGEND
n
SCALE: 1" _ 40'
CONTOUR INTERVAL _ l'
EIISTI~JG S~ORM DRAII,rAGE
["ISTIIIG SA~IITAPY SEWEF
["STIIIG I'IA:EP MAIN
--SI)------.,... PR()P(l~f[: 1)"'" ~I.:JPM I)PAIIIA:;,
--s _____ PPC.lP(lSfl: ;,!"t SMJIIAP, <';fMP
___ PPOPO<:;fl: Il~t \\IATfP f..'AItI
• FIRE I-<YDRAtH * STRE~T LIGHT
PPOPOSEC LOT vilE
GUILD"j;::' S[TGAo~" LIIJ[
flLI ______________________________________________________________________________ ~
m
~
~
(/) w z ~ «:5 ~ (f) ~
a: 0 ~ w II:::>
Z « ~
Z ...J 0 o «
It) ~
FIG 1.3
1 c.1
z
" ~
~ o
5
Figure 1.4
Soils Map
)·7
47" 272Z N
4'" 2713"N
Custom So il Resource Report
So il Map
560140 560180 56<l22O 560260 060300 560340
N
A
Map$cale: 1: 1,810 ifpmted OIl A landscape (11" x 8.5") sheet.
~----~2~5 ====~~~----------~'~OO~==========~'~
O~~~~~'~OO~----~200~====~~~
Mapprojecfun : Wd:J r-"e1::ator Cornel'"OXlrdnates: \oVGSS4 Edgetx:s: VTM Zone lON WGS84
8
560300 _20 5ro\6O 560500
s
~
~
~
I
~
~
~
~ ~ 47"Zl l l"N
Custom Soil Resource Report
Map Unit Legend
King County Are., Washington (WA633)
Map Unit Symbol I Map Unit Name Acres in AOI Percent of AOI
Age I Alderwood gravelly sandy loam, 6.8
6 to 15 percent slopes
[Totals fO~~--,,:~~~ter~~t --=~=----------6.8
Map Unit Descriptions
The map units delineated on the detailed soil maps in a soil survey represent the soils
or miscellaneous areas in the survey area. The map unit descriptions, along with the
maps, can be used to determine the composition and properties of a unit.
A map unit delineation on a soil map represents an area dominated by one or more
major kinds of soil or miscellaneous areas. A map unit is identified and named
according to the taxonomic classification of the dominant soils. Within a taxonomic
class there are precisely defined limits forthe properties of the soils. On the landscape,
however, the soils are natural phenomena, and they have the characteristic variability
of all natural phenomena. Thus, the range of some observed properties may extend
beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic
class rarely, if ever, can be mapped without including areas of other taxonomic
classes. Consequently. every map unit is made up of the soils or miscellaneous areas
for which it is named and some minor components that belong to taxonomic classes
other than those of the major soils.
Most minor soils have properties similar to those of the dominant soil or soils in the
map unit, and thus they do not affect use and management. These are called
noncontrasting, or similar, components. They mayor may not be mentioned in a
particular map unit description. Other minor components, however, have properties
and behavioral characteristics divergent enough to affect use or to require different
management. These are called contrasting, or dissimilar, components. They generally
are in small areas and could not be mapped separately because of the scale used.
Some small areas of strongly contrasting soils or miscellaneous areas are identified
by a special symbol on the maps. If included in the database for a given area, the
contrasting minor components are identified in the map unit descriptions along with
some characteristics of each. A few areas of minor components may not have been
observed, and consequently they are not mentioned in the descriptions, especially
where the pattern was so complex that itwas impractical to make enough observations
to identify all the soils and miscellaneous areas on the landscape.
The presence of minor components in a map unit in no way diminishes the usefulness
or accuracy of the data. The objective of mapping is not to delineate pure taxonomic
classes but rather to separate the landscape into landforms or landform segments that
have similar use and management requirements. The delineation of such segments
on the map provides sufficient information for the development of resource plans. If
intensive use of small areas is planned, however, onsite investigation is needed to
define and locate the soils and miscellaneous areas.
10
I
I
100.0% I
100.0% I
2. CONDITIONS AND REQUIREMENTS SUMMARY
Review of the 8 Core Requirements and 6 Special Requirements
This section describes how the project will meet the 2009 Surface Water Design Manual's
Core and Special Requirements.
Core Requirement No.1 Discharge at the Natural Location
In the existing conditions, the site drains to the west, towards a roadside ditch and culvert
system on the east side of Benson Road S. The ditch and culvert system ultimately
discharges to the northwest comer of the project site, and continues along Benson Road
S. The proposed detention/water quality pond will discharge to the northwest comer of
the site, which is the natural discharge location for the project site.
Core Requirement No.2 Off-site Analysis
A Level 1 Downstream Analysis was performed by ESM on September 19, 2013. See
Section 3 for the offsite analysis.
Core Requirement NO.3 Flow Control
Based on the City of Renton's Flow Control Application Map, the project site is in the Flow
Control Duration Standard (Forested Conditions) area See Section 4 for Flow Control
Analysis and Calculations.
Core Requirement No.4 Conveyance System
The stormwater drainage conveyance system will be sized to convey the 25 year design
storm event and to contain the 100 year design storm event A detailed Conveyance
System Analysis and Design is provided in Section 5 and Appendix C.
Core Requirement No.5 Erosion and Sediment Control
The proposed project will include clearing and grading for the 21 single-family units,
associated roadways, and pond area The two existing units and their associated
driveways and accessory structures will be demolished. Erosion and sediment controls
will be provided to prevent, to the maximum extent pOSSible, the transport of sediment
from the project site to downstream drainage facilities, water resources, and adjacent
properties. The Temporary Erosion and Sedimentation Control (TESC) Plans will be
shown on the final construction plans and additional information is provided in Section 8
of this report
Core Requirement No.6 Maintenance and Operations
The Operations and Maintenance Manual is provided in Appendix D.
Core Requirement No. 7 FinanCial Guarantees and Uabillty
All drainage facilities constructed or modified for projects will comply with the financial
guarantee requirements as provided in the City of Renton Bond Quantities Worksheet
The Bond Quantities Worksheet, Declaration of Covenant, and Facility Summaries are
provided in Section 9 and Appendix E.
Core Requirement No.8 Water Quality
The site does not meet the requirements for enhanced treatment in the 2009 Surface
Water Design manual, therefore Basic Water Quality treatment will be provided.
Treatment for the pollution generating surfaces will be provided by a StormRlter manhole
following the detention pond. See Section 4 for more information.
2-1
Special Requirement No.1 Other Adopted Area-Specific Requirements
There are no master drainage plans, basin plans, salmon conservation plans, stormwater
compliance plans, flood hazard reduction plan updates, or shared facility drainage plans
for this project. Special Requirement No.1 does not apply.
Special Requirement No.2 Aood Hazard Area Delineation
There is no 1 DO-year flood plain associated with a large body of water (i.e. lake or stream)
on the site or adjacent to the site. Special Requirement No.2 does not apply.
Special Requirement NO.3 Aood Protection Facilities
The project lies outside any pre-defined flood plain. Special Requirement NO.3 does not
apply.
Special Requirement No.4 Source Control
The project is a residential subdivision and is not subject to this requirement. Special
Requirement No.4 does not apply.
Special Requirement No.5 011 Control
The project does not have a "high-use site characteristic" and is not a redevelopment of a
high-use site. Special Requirement NO.5 does not apply.
Special Requirement NO.6 Aquifer Protection Area
According to the "Groundwater Protection Areas in the City of Renton" map, the project
site is not in an Aquifer Protection Area. Special Requirement NO.6 does not apply.
2-2
3. OFF-SITE ANALYSIS
Task 1: Study Area Definition and Maps
Figure 1.2 shows the existing site conditions. Figure 3.2 shows the extent of offsite
analysis and the downstream flow path from the Site.
Task 2: Resource Review
Flow Control Map
According to the City of Renton Row Control Application Map, the site is in a Flow
Control Duration Standard (Forested Conditions) area
Soil Survey Map
According to the Geotech Report prepared by Earth Solutions NW on September
10, 2013, the geologic map of the area indicates the site is underlain by glacial till
(QYI) deposits throughout the site. The native soils observed at the test pit
locations are generally consistent with glacial till.
King County iMap
According to the King County GIS Viewer (iMap), the project is NOT in any of the
following areas:
o Streams & 100 year floodplains
o Erosion Hazard Areas
o Seismic Hazard Areas
o Landslide Hazard Areas
o Wetlands
According to Figure 4-3-050Q3a(i) in the Renton Municipal Code, a portion of the
north parcel is located in a moderate Coal Mine Hazard Area However, Earth
Solutions NW, LLC has evaluated the site and determined that there is no
evidence of a coal mine hazard area on site. Please see Earth Solutions' report in
Appendix B.
City of Renton 2009 Surface Water Manual Amendments
There are "sensitive" slopes onsite in the northwest comer of the property,
however this area will be re-graded to be below 25%. According to the Reference
11 in the City of Renton 2009 Surface Water Design Manual Amendments, the
project is NOT in any of the following areas:
o Aquifer Protection Areas
o Groundwater Protection Areas
Road Drainage Problems
None noted
• Wetlands Inventorv
There are no recorded wetlands on or near the site.
Migrating River Study
None noted
3-1
City of Renton Coal Mine Hazard
11 ~==~~========================~==============~
o
1 13 -4------===6:::J;----==134 F,"
WGS _ 1984_ Web_Mercator _Auxiliary_Sphere
City of R:etrto n o
Finance & IT Division
C ity and County Boundary
Othel
LJ CilyofRen ton
Ad dresses
Parce ls
Coalmine
HIGH o MOD ERATE
UNCLASS IFIED
?' Prim.::.rv
Information Technology -GIS
RenlonMapSupport@Rentonwa.gov
4/15/2014 THIS MAP IS NOT TO BE USED FOR NAVIGATI ON
II
City of Renton Regulated Slopes
o -67 134 Feel
WGS _ 1984_ Web_Mercator _ Auxilia ry_Sphere
City of RenTon 0
Finance & IT Division
City and County Bou ndary
Other r:J Otyof Renton
Addresses
Parcels
Slope City of Rento n
>15%&<:25%
>25% & <=40% (Sensitive)
• >40% & <=90% (Protected)
• >90% (Protected)
Information TechnO logy -GIS
RentonMapSupport@Rentonwa.gov
4/15/2014
Thlsmap 1sausergenerated stattC output Irom an Internet mappin gSlteand
Isfol leferenceorlly Dma laye rstll,ll appea' on lhlS map may or may not be
aCCUIate cwrent. or olhel"\~ise re;lab'B
THIS MAP IS NOT TO BE USED FOR N AVIGATION
I
I
I
I
I
I
City of Renton Sensitve Areas
Sensitive Areas: Aquifer. ErOSio n, Flood. landslide. II Seismic. REgulated Shoreline, Streams, Wetla nds
II o
-67 134 Feel
WGS _ 1984_ Web_Mercator _Aux il iary_Sphere
City of R:etrro n o
Finance & IT Division
City a nd Cou nty Bou ndary
OU)e r
[: J City 01 Renton
Addresses
Parcels
Aqu ifer Pro tection Zo nes
[::J Zone t
Zone 1 Modified
o Zone 2
W pllfiplrl r:~n l llrp 7r.n p
Information Tec h nology · GIS
RentonMapSuppon@Rentonwa.gov
4/15/2014
o Eros io n
~ Floodway
Special Fl ood Hazard Areas (100
year flood )
Landsli de
• VERY HIGH
• HIGH
MODERATE
UNCLASSIFED
Fau lts
ThiS rrapisa user gener31ec SlalicoutplJtfrQtr an Intc-netmappmg site and
IS for reference only Data layers thatappearon ths map rnay 01 r'18y not be
accurate,currenlorOlhe"I>,serel,able
THI S M AP IS NOT TO B E USED FOR NA V IGATION
FIgure 3.1
KeGIS Parcel Report/Environmental Hazards
3-2
III King County
King County Districts and Development Conditions for parcel 0087000080
Parcel number 0087000080 Drainage Basin
Address 16424 BENSON RD S -Jurisdiction Renton -Zipcode 98055 PLSS
Kroll Map page 601 Latitude
Thomas Guide page 6'6 Longitude
Sl Electoral-Oistricts----------
Congressional district
Legislative district
School district
RNT 11-1012
District5,~~ ....
(206) 296-100' @
• -
Fire district
Water district
Sewer district
Water & Sewer district
does not apply
does not apply
does not apply
SODS Creek Water & Sewer District
Parks & Recreation district does not apply
Hospital district
Seattle school board district does not apply (nol in Seatue) Rurallrbrary district
Public Hospital District No.1
Rural King County Library System
No District Court electoral district Southeast Tribal Lands?
Coal mine hazards?
Erosion hazards?
Landslide hazards?
SeismiC hazards?
Forest Production district?
Agricultural Production district?
1 OO·year flood plain?
Wetlands at this parcel?
This reportw8s gen.e~,a~te~d iO"~9iI2ii7~'2.D'iii3ii3."i2:02 PM
Contact us a\~ ©2010 King County
~ King County
King County Districts and Development Conditions for parcel 0087000081
Parcel number
Address
Jurisdiction
Zipcode
Kroll Map page
Thomas Guide page -
Congressional district
Legislative district
School district
0087000081 Dramage Basm Black River
Not Available -Renton
98055
60'
656
-PLSS NW-29-23-5
Latitude 47.45552
Longitude -122.19947
RNT 11-1012
District5l!1!!!!~1III!!1II!!I
(206) 296·' DO' fii:j
Fire district
Water district
Sewer district
Water & Sewerdislrict
does not apply
does not apply
does not apply
S005 Creek Water & Sewer District • -Parks & Recreation district does not apply
Hospital distnct
SeaUie school board district does not apply (not in Seattle) Rural library district
Public Hospital District No.1
Rural King County Library System
No District Court electoral district Southeast Tribal Lands?
Eo King County planning and· •••• ld-"~rl~tions== ........ ---:---_-_-= .... ~-__ --._-__:_=.:: .... ---.
Coal mine hazards?
Erosion hazards?
Landslide hazards?
Seismic hazards?
NA, check with jurisdiction
None
does not apply
Urban
does not apply
Soos Creek
None mapped
None mapped
None mapped
None mapped
!5555~:: •••• does not apply 333
does not apply
No Forest Production district?
Agricultural Production district?
1 aO-year flood plain?
Wetlands allhis parcel?
No
No
None mapped
None mapped
None mapped
This report was gen.e~'a~te~d~on~9~f2~7f~2i10'iii31ii3ii.'i3:23 PM
Contact us at,~
© 201 a King CounlY
I:i King County
King County Districts and Development Conditions for parcel 0087000075
Parcel number 0087000075 Drainage Basin
Address 2724 BENSON RO S -Jurisdiction Renton
Zipcode 98055
Kroll Map page 601
Thomas Guide page 656
El Electoral Districts -
Congressional district
Legislative district
School district
-PLSS
Latitude
Longitude
RNT11·1012
District5.!IJI!!~".
1206) 296·1005 ~
• -
Black River
NW-29-23-5
47.45516
-122.20074
Fire district
Water district
Sewer district
Water & Sewer district
does not apply
does not apply
does not apply
Soos Creek Water & Sewer District
Parks & Recreation district does not apply
Hospital district
Seattle school board distnct does not apply (not in Seattle) Rural library distnct
Public Hospital District No.1
Rural King County library System
No District Court electoral district Southeast Tribal Lands?
.§fk.~i~nJl.'-~~ou~lI1!i'-~l(jd ••••• desTg;'~a~tio~,,~s-_-=--=~~~~~---=-=_~ ___ _
Coal mine hazards?
Erosion hazards?
Landslide hazards?
Seismic hazards?
Forest Production district?
Agricultural Production district?
1 DO-year flood plain?
Wetlands at this parcel?
does not apply
333
does not apply
No
No
No
None mapped
None mapped
None mapped
This report was gen.e~ra~te~d ion~9.12.7/~20.'i3i3'i45i:35 PM
Contactusat,!I
©2010 King County
I;Q King County
King County Districts and Development Conditions for parcel 0087000070
Parcel number 0087000070 Drainage Basin Black River
Address Not Available -lJ Jurisdiction Renton -Zipcode 98055 PLSS NW·29·23 -5 (
Kroll Map page 601 Latitude 47.45485
Thomas Guide page 656 Longitude -122.20002
"
8 Electoral Districts -RNT 11·1012
District 5, !I!!!!I!II"I!!II
(2061296-1005 fiiJ
Fire district
Water district
Sewer district
does not apply
does not apply
does not apply
Congressional district
Legislative district
School district • -Water & Sewer district SODS Creek Water & Sewer District
Parks & Recreation district does not apply
Hospital district
Seattle school board district does not apply (not in 5eatlle) Rural library district
Public Hosj:lltal District No.1
Rural King County library System
No Distnct Court electoral district Southeast
Coal mine hazards?
Erosion hazards?
Landslide hazards?
Seismic hazards?
Tribal Lands?
Forest Production district?
Agricultural Production district?
100-year flood plain?
Wetlands at this parcel?
This report was geniiie,~at~e~d O."~9ii/2~7/~20.'ii3ii3'.'5j:49 PM
Contact us at~
© 20 1 0 King County
Downstream Drainage Complaints
There are no downstream drainage complaints within the last 10 years. The only
drainage complaint in the downstream path is number is 2001-0026 and is on parcel
#2923059105. It is a request for drainage information, and was closed on 2001-01-26.
Rec Complaint Proble Type Reed Close Address PIN Comments ~ No m Date Date
1 2001-0026 DDM C 111112001 112612001 16415 292305910 REQUEST FOR INFORMATION OF EX -I
BENSON 5 DRAINGE ACROSS PVT PROP.
i RD SYSTEM APPEARS TO BE CITY OF
RENTON.
This does not pertain to flooding or any drainage system problem; therefore the project
site would not impact any downstream drainage complaints.
3-7
Task 3: Field Inspection (Level 1 Inspection)
A Level 1 Downstream Analysis was completed by ESM Consulting Engineers on
September 19, 2013. The project sits at the top of the Rolling Hills Subbasin. The project
site is at a high point, and very little flow is anticipated to flow on site. A portion of the
road to the east (S 28'h St.) will flow onto the project site on the road. This area will be
conveyed through the proposed detention/water quality pond.
There is a portion of the uphill frontage road that naturally drains through the project's
existing frontage. This area will be collected and detained and treated in the proposed
detention/water quality pond.
Task 4: Drainage Description and Problem Descriptions
According to iMap, the entire project site is in the Black River (King County WRIA #9)
basin. Black River is located to the northwest of the project site, and is tributary to the
Duwamish Waterway.
In general, the site flows from the southeast to the northwest. The low point of the site is
in the northwest comer of the property, and discharges to an existing roadside ditch to
the north along the east side of Benson Road S. From here the flow continues north for
about 140 feet until it enters a Type 2 catch basin via a culvert in the roadside ditch. The
catch basin flows to the north through a series of catch basins with solid lids located in
the planter strip parallel to Benson Road S. It appears to enter a Type 2 catch basin
located at the end of a swale, at the southeast comer of the intersection of S 26'h Street
and Benson Road S. From here the flow enters a stormwater system located in the
flowline of Benson Road S (there is sidewalk and curb and gutter on both sides of
Benson Road S from here to the north).
The catch basins in Benson Road S appear to be Type 2 structures, and also relatively
deep. The exact direction of flow was difficult to determine, but it appears the flow
continues in the piped system north on Benson Road S. This is a fully built out road with
a pipe and catch basin system in the flowline.
The proposed project will discharge to the downstream system at a lower rate than
currently existing. It will match the historical predeveloped flows, which are till forested
conditions. The current site is mainly lawn, two residences, and gravel driveways,
therefore it is currently discharging much more than historical predeveloped flows.
Task 5: Mitigation of Existing or Potential Problems
All runoff from the site will be collected in a piped storm system and directed to the
proposed combined detention/water quality pond. From there, runoff will be discharged
at the Row Control Duration Standard (Forested Conditions) into the existing storm
drainage system in Benson Road S.
3-8
Figure 3.2
Offsite Analysis Downstream Aowpath
3-9
•
•••• :~~~~'lC· .
:'.:::C~':~;I::_·_~ •• ~~ .... ,, __ ~~,f)~~~'. y~ .. ",., .... ~.1I'l~~
.,.... 1_ r
~----'O:=--
.~',:~:~ft"
~'I··~·-\1ii I ',:
_~ .. '1\ i
_,>1 '
.~
II II
__ J~
,I
:1 I
Photo 1. View to the east towards the alley and offsite properties. The east side of the site is
approximately level with the neighboring property.
I
Photo 2. View to the southeast towards the alley and comer of the project The east side of the
site is approximately level with the neighboring property and flows to the west.
Photo 3. View offsite to the east of the intersection of the proposed alley and SE 1651h SI. SE
165th SI. will be extended and brought through the project to Benson Road S.
Photo 4. View to the west side of the property, from the east The project site slopes generally
from east to west
Photo 5. View a long the frontage looking towards the north on Benson Road S. The storrnwater
runoff from Benson Road S and from the property is co nveyed by a well defined , grass lined ditch .
Photo 6. The runoff continues north on Benson Road S along the property frontage and reaches
a culvert running undemeath an existing gravel driveway.
Photo 7. View of the culvert under the southemmost project driveway and continuation of the
roadside ditch.
Photo 8. The roadside ditch meets with a 12"0 CPP culvert
Photo 9. Continuation of the roadside ditch north along the frontage before entering a 12"0 RCP
culvert under the northern existing gravel driveway.
Photo 10. The 12"0 Rep culvert running under the projecfs north existing gravel driveway.
Photo 11 . Continuation offsite to the north of the roadside ditch in Benson Road S.
Photo 12. Further continuation to the north of the roadside ditch in Benson Road S.
Photo 13. Further continuation to the north of the roadside ditch in Benson Road S.
Photo 14. The roadside ditch enters into a 12"0 CPP culvert with a debris cage installed.
Photo 15. The 12"0 CPP culvert enters this catch basin . It is a type 2 catch basin with a debris
cage installed on top .
Photo 16. View inside the type 2 catch basin, facing north. Row from the roads id e ditch/culvert
enters from the south. There is another inlet pipe from the east, S 277'" St
Photo 17. Flow from the type 2 catch bas in enters a catch basin with a so lid lid , located in the
landscaped area behind the sidewalk
Photo 18. Row continues to another catch basin with a solid lid. From here, the flow enters a
type 2 catch basin with a debris cage installed on top.
Photo 19. View looking east into the type 2 structure with the debris cage. Row from the solid lid
structure enters from the south (left side of the picture). There is an additional inlet on the north
side of the structure (right side of the picture) that captures part of the Benson Road S runoff. This
structure discharges to the west (top of the picture) across the street
Photo 20 . Row crosses the street into a CB located in the flow line of Benson Road S. This CB is
a type 2 CB and is deep. It was difficult to see all the way down to see in which direction flow
headed. Water could be heard running in the structure , and it appeared to be heading to the
north along Benson Road S.
Photo 21 . Row continues north on Benson Road S to the north into this CB. Water could be
heard running through the structure , similar to the upstream type 2 CB .
Photo 22. Row continues north on Benson Road S to the north into this CB. Water could be
heard running through the structure, similar to the upstream CB.
Photo 23. Row continues north on Benson Road S to the north into this CB . Water could be
heard running through the structure, similar to the upstream CB. The endpoint of the arrow is the
point that is about Y, mile downstream from the project site.
4. FLOW CONTROL & WATER QUALITY FACIUTY ANALYSIS AND DESIGN
4.1 Existing Site Hydrology
The existing site consists of two single-family dwellings with associated gravel driveways,
along with a few small detached structures. All structures on site will be demolished. The
existing site is relatively flat (mean slope of about 7%, less than 10% max slopes on site)
and slopes down generally from the southeast comer of the property towards the
northwest. The pervious portions of the parcels are generally lawn except the northwest
corner of the site is forested.
According to the geotechnical report prepared by Earth Solutions NW, the soils on site are
glacial till. See Rgure 1.4 for the Soils Map. This report shows that the site is generally
underlain with Till soils, which are incapable of infiltration. Therefore Till soils are used in
the KCRTS model, with the entire predeveloped area being modeled as Till Forest
Approximately 2.32 acres of upstream area drains onto the site from the south (along
Benson Road S) and the east (the area on the east side of the alley). To the east is a
roadway cul-de-sac with nine lots and to the south is one lot. From inspection of available
aerial data, these lots were modeled as 40% impervious. The right-of-way is modeled as
75% impervious.
The predeveloped basin for the laRosa project includes frontage along Benson Road S
and the alley on the east side of the project
TABLE 4.1
re-eve ope utary ea POI dTrib Ar
SUBBASIN TOTAL AREA nu.FOREST
(Ac) (Ac)
laRosa + Frontage + Alley 4.78 4.78
TOTAL 4.78 4.78
See Rgure 4.1 for a visual representation of the predeveloped tributary area
4.2 Developed Site Hydrology
The project will create 21 single family lots with associated roadway, sidewalk, driveways,
roof areas, landscaped yards, and a detention pond and StonnFilter Manhole. There will be
one drainage area within the project
According to the zoning code, the maximum impervious area allowed by the City of Renton
Zoning Code 4-2-11 OA for R-8 zoned lots is 75%. However, per City of Renton 1.2.3.3, the
site will utilize Row Control BMP C2.9 Reduced Impervious Surface Credit, and reduce on-
site allowable impervious area by 10%. Therefore, building rooftops and impervious areas
(driveway, porch, patios) are modeled as 65% impervious. Right of Way areas a modeled
as 70% impervious.
The detention pond and StonnRlter Manhole are located in the northwest comer of the site.
The detained/treated runoff will discharge to the existing roadside ditch along the east side
of Benson Road S, which is the site's natural discharge location.
The frontage improvement area, along with a portion of the proposed roadway, and a
portion of the alley on the northeast side of the site will be unable to be captured by the
pond and will be treated as bypass area, based on elevation. However, a portion of the
4-1
upstream frontage along Benson and the alley southeast of the property will drain onto the
project. These areas will be treated and detained, which will offset the area on the frontage
that is not able to be collected by the proposed system. These bypass areas total 0.26
acres in size. Essentially, the portion of the upstream frontage and upstream alley being
detained will be added to the developed basin, while the portion not treated will be
removed. In addition to the above, a portion of S 28'h Street will be routed through the
combined detention/water quality pond. This flow will be treated but will flow through the
storm drainage pond and will not be detained, it will be sized as the same flow in the pre
and post developed scenarios_
TABLE 4.2
Develoll ed Pond Detained Area
SUBBASIN TOTAL IMPERV. TILL
AREA AREA(Ac) GRASS
(Ac) (Ac)
laRosa 4.78 2.94 1.84
Offsite Area 2.32 1.04 1.28
TOTAL 7.10 3.98 3.12
The total bypassed area is 0.26 acres of ROW area. According to KCRTS (sized as 70%
impervious), the 100 year flow rate is 0.097 cfs, which is less than 0.1 cfs; therefore
compensatory mitigation is not required. However, upstream area equal to the bypass area
(0.26 acres) will be treated and detained, so it will not be modeled as bypass area.
The upstream area 100 year flowrate is 0.718 cfs. The onsite, developed, 100 year flow rate
is 1.69 cfs. Therefore, the 1 00 year offsite flowrate is less than 50% of the 100 year
developed flowrate, and is acceptable per the 2009 Manual Section 1.2.3.2.F.
See Figure 4.2 for a visual representation of the Developed Tributary Area.
4.3 Perfonnance Standards
Performance Standards for flow control design use the KCRTS Methodology with hourly
time steps as described in Section 4.4 below. Runoff files for the existing, proposed, and
bypass conditions were created using the historic KCRTS time series data sets for the
SeaTac Rainfall Region with a Correction Factor of 1.0.
The site requires basic water quality treatment. Water quality will be satisfied with a
Storm Filter Manhole, which will follow the detention pond.
4-2
4.4 Flow Control System
The pond was sized per the requirements in the 2009 Surface Water Design Manual. Per
the City of Renton's Flow Control Application Map, the project site is in the Flow Control
Duration Standard (Forested Conditions) area This standard requires the site to match the
durations of high flows at their predevelopment levels for all flows from one-half of the 2
year peak flow up to the 50 year peak flow,
The offsite flows being routed through the pond are not subject to flow control, therefore the
offsite flows will be added to the predeveloped and developed flows.
Predevcombined = predev (onsite) + offsite flows
Devcombined = dev (onsite) + offsite flows
The target flows are calculated as follows:
50% 2 year: 50% of the 2 year from predev (onsite) + offsite 2 year
50 year: predev 50 year + offsite 50 year
The pond's inflow will be modeled using the devcombined time series and the pond's
outflow will be the rdout time series, This rdout time series will match the Row Control
Duration Standard (Forested Conditions),
KCRTS v6.0 was used to design the proposed pond, Procedures and design criteria
specified in the 2009 Surface Water Design Manual were followed for the hydrologic and
hydraulic modeling. The KCRTS pond sizing output is included in Appendix A
There will be no net downstream effect after development An equivalent upstream area
will be detained and treated to negate the bypass area Upstream offsite areas, which were
previously undetained and untreated, will be treated and released in the site's natural
discharge point
The KCRTS output models the required detention volume as 36,936 cubic feet of storage,
with 6.0 feet of detention. The proposed pond provides 38,906 cubic feet of storage, which
results in a construction factor of 5.3%.
4-3
Figure 4.1
Pond PredevelopedlDeveloped Tributary Areas
4-4
J ~!
Ii
\
LEGEND
t'iISW,G
CITCH
rLLd PREDEVfIOPED B .... SIN AREA 4.78 AC
~ UPSTREAM orrS1T[ BASIN AREA 2 . .3? AC
A PORTION OF THE NW 1/4 OF SECTION 29, TWP. 23 N., RGE. 5 E, KING COUNTY, WA
"" " ~
" ~ I~ J I ~ ~~,
SCALE: 1" -40'
~-o "
CONTOUR INTERVAL _,'
n
I
I
L
l~-
~I~ . "' ~I-' li ~! ~~ 1~
:~
m
i • · ·
~
~
~
'" ...
CIl >-'" w ~
~ <CE
0 (f)~
I 0 0 a: w crt z «d z ...J~ 0 w
0 '" 0-
0
Z
~
~
~
i5
---.!
~_Ol~ -
Dill". ~A"E
FIG 4.1
1 oc 3
)
t
I
~i .' H
\
BYP;-/SS
B;'.3IN
'" /~~
LEGEND
~D[VELOPECBASI~JAf"tA
~UP5TREAMOFFSITE8ASI"AP[A
[]I] BYPASS BASlr, APEA
~ UPSTREAM BYPASS BASil, ARFA
TRACT A
STORM DRAINAGE
FACILILTY
DETWTION REQUIRED.
DETENTION PROVIDED
NOTE:
36.936cr
38.906CF
4.75 AC
2 . .:52AC
0.26AC
OFFSIT[ AREA
ONSIT[ APEA
TREATED. flU: NOT DETAINED
TREATED At~D DETAINED
I
/
I
( /
I \,
A PORTION OF THE NW 1/4 OF SECTION 29. TWP. 23 N., RGE. 5 E. KING COUNTY. WA
~
SCALE: 1" _ 40'
~:--:-----:o
CONTOUR INTERVAL. l'
UPSTF(E;",ivl
BYP~.sS
8;".311'1
n
ilL I _________________________________________________________________________________________________________________________________________________________________________________ ~
(f) w
:2 o
I
a:
W
Z
Z o o
z
~
i
L5
~
>-'" «g
(/)il1 0: a:~ «:3 ..J~
'" '" Z o
D..
z ~
~ o
5
FIG 4.1
2 cc 3,.""
~
l
i
~ ~
li
~ :;-
LEGEND
~O[VHOPEDBIISINf,f;>EA
~ uOSTR[A~ orFSITE 6ASI~J M"fA 2.32 AC
[[]il BYPASS 6AS'", AREA 0 .26 Ae
~ UPSTRfAM BYPASS BASIN AR E.I.
TRACT A
STORM DRAIN AGE
FACILI LTY
DET EWICN REGU ,RED : 36.'?J6Ci'
DE TfN 1IDr.J PROVIDED 38,906Ct
NOTE:
orFSITE ARE,\, TREATED. OUT NO~ DETAlI,ED
ONSIH AREA TREATED AI<D DETAINE[)
A PORTION OF THE NW 1 /4 OF SECTION 29 , TWP. 23 N., RGE. 5 E, KING COUNTY, WA
n
SCALE: 1 H _ 40'
4r:--::--:---:O
CONTOU R INTERVAl _ 2'
~I LI ________________________________________________________________________________________ ~
I
l----
I-
:! j ~ j( * ~~ (1 _ ~
?'1'
h " ~! i~ n
m
rJ)
LJ.J
~
0
I
a:
LJ.J z z
0
0
.... 1l o~
"'HIT
t
:?~
" E ~,.
~ if
H u
5 ~
~
--' "" Ii'
c:x:~ (/)0<
O~ a:"" c:x:~
-.J3 w
[;j
0
!
is
5
FIG 4.1
3 or 3 S><EO<,
4.5 Water Quality Facility
The project site requires basic water quality treatment. This treatment will be provided by a
Storm Filter Manhole following detention. Additionally, there will be a Stormgate ftow
splitting structure before the Storm Filter to route flows that are above the water quality ftow
rate around the StormRlter Manhole. See Appendix F for the Storm Riter and Stormgate
calculations and worksheets.
4-6
5. CONVEYANCE SYSTEM ANALYSIS AND DESIGN
A conveyance analysis was performed for the mainline storm drainage systems and the
rooftop conveyance systems. The StormSHEO results provided in Appendix C
demonstrate that the pipe networks function per the requirements of the 2009 Stormwater
Manual for peak storm conveyance. The proposed conveyance system's parameters are
as follows:
Backwater was analyzed using StormSHEO 3G proprietary software, using the rational
methodology to analyze each sub-basin area. The project is not located near a location
with an IOF curve table created, therefore the IDF values for Seattle are used.
The outlet system was sized using a fixed flow of the 100 year, 15 min developed storm,
to model the maximum flow rate possible through the pond outlet structures.
Developed Land Uses used:
Lawn (c=o.25)
Pavement and roofs (c=0.90)
Rainfall Data Used:
25 year: 3.40 in
100 year: 3.90 in
The time of concentration is set at the 2009 Stormwater Manual minimum, 6.3 minutes, to
add conservatism to the system design.
The system was designed to convey the 25 year storm with no capacity or backwater
issues. Additionally, the system was tested with the 100 year storm to determine that no
Hooding or backwater would occur, even with overcapacity in pipes.
Naming Convention used in StormSHED:
Drainage basins are referred to as "Basins"
Catch basins are referred to as "Nodes"
Pipes are referred to as "Reaches"
The StormSHED output is located in Appendix C and includes the following:
Conveyance Analysis Table
Contributing Drainage Areas Table
25 year conveyance analysis
1 00 year conveyance analysis
5-1
6. SPECIAL REPORTS AND STUDIES
Following are the reports and studies referenced for the proposed development:
• Geotechnical Engineering Report, by Earth Solutions NW, LLC, dated September
10, 2013. (Appendix B)
• Geotechnical Engineering Report [Coal Mine Hazard Areal, by Earth Solutions NW,
LLC, dated September 24, 2013. (Appendix B)
6·1
7. OTHER PERMITS
The National Pollutant Discharge Elimination System (NPDES) permit has been submitted
to the Washington DOE and is pending approval ..
This project also requires the following permits:
Building Permits
Clearing & Grading Permits
7-\
8. CSWppp ANALYSIS AND DESIGN
The permanent laRosa pond will be used as a temporary sediment pond during
construction. For this calculation, the tributary area is assumed to be fully built out. The
total contributing area to the proposed sediment pond is the same as the combined
developed area, 7.08 acres.
1.) Obtain the discharge rate for the 2-year/24 hour (15-minute) developed storm.
Total Area ~ 7.08 acres
Impervious Area ~ 4.04 acre
Pervious Area ~ 3.04 acres
Forest Area ~ 0.00 acres
O2-15 min -2.14 efs (calculated using KCRTS)
2.) Determine the Surface Area (SA) required at the top of the pond with l' of
freeboard.
SA ~ QlO.15 min (2080) ~ 2.14 * 2080 ~ 4,451 sf
Minimum pond surface area is 4,451 sf. (6,250 provided)
3.) Sizing the Dewatering Mechanism:
a.) Principal Spillway (Riser Pipe)
The diameter shall be the minimum necessary to pass the pre-developed
10-year, 24-hour design storm. Use Rgure 5.3.4.H (KCSWDM) to determine
this diameter (h = one foot).
O,D-l5mln. 0.663 efs
Per Rgure 5.3.4.H, the minimum riser diameter is 10 inches to convey this
How rate. However, a 12" riser pipe will be used.
b.) Emergency Overftow Spillway
The emergency overflow spillway shall convey the 100 year, 15-minute
developed design storm. Minimum spillway width IW) is 6.00 feet
1) Determine minimum spillway width:
W = QIOo-I5mio 2.4H (Equation 5-3 from KCSWDM)
(3.21)(H 3/2 )
0100.15min-7.92 cfs (Calculated using KCRTS)
H-0.50ft
8·)
4.)
w = 7.92 32 2.4(0.5) = 5.78/1
(3.21)(0.5 I )
Use 6.0 feet for spillway width
c.) Dewatering Orifice
1.) Size the dewatering orifice (1" minimum diameter) per the following
equation from the KCSWDM:
A = A,(2h)oS
, (0.6)(3600)(T)(g05)
Where: Ao -orifice area (square feet)
As -pond surface area (square feet)
H -head of water above the orifice (riser height in It)
T -dewatering Time IT -24 hours)
g -acceleration of gravity
A = (4.451)(2(8.5))°5
" (0.6)(3600)(24)(32.2°5)
A" = 0.062s(
2.) Convert Orifice Area (Ao) to Diameter (D) in inches
D=24~(0.~62) =3.37in
Use 3-3/8" diameter for the dewatering orifice.
Per the KCSWDM, the perforated pipe shall be a minimum of 2
inches larger than the orifice sizes.
Use 6" diameter for the perforated pipe.
Sediment Pond Summary:
Basin Area-
Developed Inflow 1 Oyr/24hr (15 min) =
Pre-developed 1 Oyr/24hr -
Surface area required =
Emergency spillway width -
7.08 acre
7.92 cis
0.663 cis
4,451 sf
6.0ft
Refer to Appendix A for flow rate analysis
8-2
9. BOND QUANTITIES AND DECLARATION OF COVENANT
The Bond Quantities, Declaration of Covenant, and Facility Summary sheets are provided
in Appendix E.
9-1
10. OPERATIONS AND MAINTENANCE MANUAL
The Operations and Maintenance Manual is provided in Appendix D.
10·1
APPENDIX A
KCRTS Pond Sizing Output
laRosa Pond KeATS Output
Pre-Developed Land Use Condition
4."18 0.00 0.000000 T111 Forest
o.oc
0.00
0.00
0.00
0.00
0.00
0.00
predev.tsf
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000000 Till Pas~ure
0.000000 Till Grass
0.000000 Outwash Forest
0.000000 Outwash Pasture
0.000000 Outwash Grass
0.000000 Wetland
0.000000 lmpervlous
$T 1.000000
Flv .... , ?requency Analysis
Time Series Flle:predev.tsf
ProJect Locatlon:Sea-Tac
---Annual
Flow Rate
(CFS)
0.142
0.276
0.303
0.096
0.074
0.107
0.189
0.160
0.125
0.133
0.109
O.2C3
0.110
0.066
0.088
0.109
0.077
0.084
0.187
0.111
0.108
0.092
0.074
0.226
0.] 00
0.108
0.163
0.100
0.012
0.087
0.052
0.140
0.077
0.140
0.136
0.091
0.044
0.234
0.188
0.071
0.045
Peak ?low Rates---
Rank Time of Peak
IE 2/16/49 22:00
3/03/50 16:00
2I09/5 c 18:00
32 1/30/52 9:00
42 1/18/53 19:00
28 1/06/54 5:00
9 2/07/55 21:00
13 12/20/55 17:00
21 12/09/56 15:00
20 1/16158 20:00
24 1/24/59 2:00
11/20/59 21:00
23 2/24161 15:00
44 ]/03/62 2:00
36 11/25/62 15:00
25 1/01164 19:00
40 11/30/64 12:00
38 1/06166 3:00
11 1/19167 14: 00
22 2/03/68 23:00
26 12/03/68 19:00
34 1/13170 23:00
41 12/06/70 8:00
7 2/28172 3:00
30 1/13/73 5:00
27 1/15/74 2:00
12 12/26/74 23:00
29 12/03/75 17:00
50 3/24177 20:00
37 12/10/77 17: 00
46 2/12/79 8:00
18 12/15/79 8:00
39 12/26/80 4:00
17 10/06/81 15: 00
19 1105183 8:00
35 1/24/84 11:00
48 2/11/85 6:00
1/18186 21:00
10 11/24/86 4:00
43 1/14188 12:00
47 4/05/89 16:00
LogPearson III Coefflc~e~ts
Mean~ -0.938 StdDev~ 8.233
Skew~ -0.148
-----Flow Frequency Analysis-------
- -Peaks Rank Return Prob
(eFS) Period
0.322 89.50 0.989
0.303 32.13 0.969
0.288 19.58 0.9~9
0.282
0.276
0.234
C.22E
0.203
0.189
G.188
0.187
C.163
0.160
0.157
0.146
0.142
0.140
0.140
0.136
0.133
0.125
0.111
0.110
0.109
0.109
0.108
0.108
0.107
0.100
0.100
0.098
0.096
0.094
0.092
0.091
0.088
0.087
0.084
0.077
0.077
0.074
10
11
12
13
14
15
16
17
i8
19
20
21
22
23
24
25
26
27
28
29
30
3]
32
33
34
35
36
37
38
39
40
41
14.08
10.99
9.01
7.64
6.63
5.86
5.24
4.75
,;, 34
3.99
3.70
3.44
3.22
3.03
2.85
2.70
2.56
2.44
2.32
2.22
2.13
2.04
1.96
1. 89
1. 82
1. 75
1. 70
1. 64
1. 59
1. 54
1. 4 9
1. 45
1. 41
1. 37
1. 33
1. 30
1. 27
1. 24
0.929
0.909
0.889
0.869
0.849
0.829
0.809
0.789
0.769
0.749
0.729
0.709
0.690
0.670
0.650
0.630
0.610
0.590
0.570
0.550
0.530
0.510
0.490
0.470
0.450
0.430
0.410
0.390
0.370
0.350
0.330
0.310
0.291
0.271
0.251
0.231
0.211
0.191
C.322
C.282
0.09~ 33
C.098 31
0.027 49
0.146 15
0.288 3
0.157 14
0.055 45
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
1/09/9CJ ::)0
4/0~/91 2:00
1/27/92 17:80
3/7.3/93 0::10
3/03/94 3:00
2119/95 20:00
2/09/96 1:00
1/02197 9: 00
1107/98 10:00
0.074
0.011
0.066
0.055
0.002
0.0(5
0.0f,4
0.027
0.012
0.380
0.333
0.288
0.228
0.2;5
0.182
0.1: 7
0.077
42 1. 21
43 1.1B
44 1.15
45 1. 12
40 1.10
n 1. 08
48 1. 05
49 1. 03
50 1. 01
100.00
50.00
25.00
10.00
8.00
5.00
2.00
1. 30
Developed Land Use Condition
dev. tsf
0.00
0.00
] .84
0.00
0.00
0.00
0.00
2.94
ST 1.000000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000000 Till Forest
0.000000 Till Pasture
0.000000 Till Grass
0.000000 Outwash Fores~
0.000000 Outwash Pasture
0.000000 Outwash Grass
0.000000 Wetland
0.000000 Impervious
O.
c.
C.
c. ~ 1-1
C.C91
0.071
0.C51
0.03]
0.011
0.990
0.980
0.960
0.900
0.875
0.800
0.500
0.231
Flow Frequency Analysis
Time Serles File:dev.tsf
Proj ect Location: Sea-Tac
LogPearson III Coefficients
Mea~= -D.DE3 StdDev= 0.110
Skew= 0.432
---Annual
Flow Rate
(CFS)
0.888
1. 48
0.909
0.707
0.678
0.826
0.852
0.832
0.989
0.868
0.646
0.837
0.741
0.731
0.740
0.828
0.742
0.748
1.14
1. 23
0.682
0.754
0.720
1. 12
Peak Flow Rates---
Rank Time of Peak
21 2/16/49 21:00
3/03/50 16:00
20 2/09/51 2:00
40 10/15/51 13:00
45 3/24/53 15:00
27 12/19/53 19:00
23 11/25/54 2:00
25 11/18/55 15:00
15 12/09/56 14:00
22 12/25/57 16:00
47 11/18/58 13:00
24 11/20/59 5:00
36 2/14161 21:00
38 11/22/61 2: 00
37 12/15/62 2:00
26 12/31/63 23:00
35 12/21/64 4:00
34 1/05166 16:00
11/13/66 19:00
8124/68 16:00
43 12/03/68 16:00
33 1/13170 22:00
39 12/06/70 8:00
8 2/27172 7:00
-----Flow Frequency Ana1ysis-------
- -Peaks Rank Return Prob
(CFS) Period
1.57 89.50 0.989
1. 48
1. 44
1. 42
1. 23
1. 23
1.14
1.12
1. 09
1. 05
1. 02
1. 02
1. 02
1. 00
0.989
0.969
0.963
0.953
0.940
0.909
0.888
0.868
0.852
0.837
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
32.13
19.58
14.08
10.99
9.01
7.64
6.63
5.86
5.24
4.75
4.34
3.99
3.70
3.44
3.22
3.03
2.85
2.70
2.56
2.44
2.32
2.22
2.13
0.969
0.949
0.929
0.909
0.889
0.869
0.849
0.829
0.809
0.789
0.769
0.749
0.729
0.709
0.690
0.670
0.650
0.630
0.610
0.590
0.570
0.550
0.530
0.664
0.802
1. OS
0.681
0.791
] .09
46 1/13/73 2:00
28 11/28/73 9:00
18 12/26/71 )3:00
44 12/02/75 20:00
30 8/26/772:00
0.953
0.969
1. 02
1. 42
1. 00
9/17/78 2:00
18 9/J8/79 15:00
0.80C
0.685
0.963
1. 23
0.543
0.703
1. 57
1.44
0.779
0.507
0.589
0.776
1. 02
16
11
4
14
29
42
17
49
41
31
50
48
32
12
0.940 19
1.02 13
Computed Peaks
Computed Peaks
Computeci Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
12/14/79
11/21/80
lO/oElS1
10/28/82
1103184
6/06/85
1/18186
10126186
11/11/87
8/21/89
1/09/90
11/24/90
1127/92
11/01/92
11130/93
11/30194
2/08/96
21:UO
11: 00
0: 00
16:00
1: 00
22:00
IE: 00
0:00
0: CO
17:00
6:00
8: CO
15:00
16:00
22:00
4:00
10:00
1/02/97 6:00
10/04/97 15:00
0.832
0.828
0.826
0.802
0.800
0.791
0.779
0.776
0.754
0.748
0.742
0.741
0.740
0.731
0.720
0.707
0.703
0.685
0.682
0.681
0.678
0.664
0.646
0.589
0.543
0.507
1. 69
1. 54
1. 39
1.21
1. 17
1. 06
0.850
0.711
2']
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
2.04
1.96
1. 89
1. 82
1. 75
1.70
1. 64
1. 59
1. 54
1. 4 9
1. 45
1. 41
1. 37
1. 33
1. 30
1. 27
1. 24
1.21
1. 18
1. 15
1.12
1. 10
1. 08
1. 05
1. 03
1. 01
100.00
50.00
25.00
10.00
S.OO
5.00
2.00
1.30
0.~10
0.490
0.470
0.450
0.430
0.410
0.390
C. T/O
0.350
0.330
0.310
0.291
0.271
0.251
O.23~
0.211
C. ,91
O. ~ 71
0.151
C.13:
O. 'll
O.Cg:
0.07 :l
C.C51
C.C31
0.011
C.990
0.980
0.960
0.900
0.875
0.800
0.500
0.23l
Bypass Land use Condition (for flow rate purposes)
0.00
0.00
0.08
0.00
0.00
0.00
0.00
0.18
bypass. tsf
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000000 Till Forest
0.000000 T111 Pasture
0.000000 T111 Grass
0.000000 Outwash Forest
o.oooaoo Outwash Pasture
0.000000 Outwash Grass
0.000000 Wetland
o.oaoooo Impervious
ST 1.000000
Flow Frequency Analysis
Time Series File:bypass.tsf
Project Location: Sea~Tac
-~~Annual
Flow Rate
(CFSI
0.052
0.084
0.052
0.043
0.040
0.048
0.050
0.049
Peak Flow Rates~-
Rank Time of Peak
21 2/16/49 21:00
3/03/50 16:00
20 2/09/51 2:00
40 10/15/51 13:00
44 3/24153 15:00
27 12/19/53 19:00
23 11/25/54 2:00
24 11/18/55 15:00
LogPearson III Coefficients
Mean= -1.293 StdOev= 0.106
Skew~ 0.463
-----Flow Frequency Ana1ysis--~~~-~
- -Pea ks Rank Return Prob
(C[S) Period
0.090 89.50 0.989
0.084 32.13 0.969
0.083 19.58 0.949
0.083 14.08 0.929
0.073 10.99 0.909
0.073
0.067
0.066
9.01
7.64
6.63
0.889
0.869
0.849
u. aSB
O.C5~
C.038
G.C49
0.044
0.G43
0.044
0.049
0.044
0.044
0.067
0.073
0.048
0.044
0.042
0.084
0.039
0.047
0.061
0.040
0.048
0.066
0.0.\8
0.056
0.060
0.083
0.060
0.047
0.041
0.056
0.0 7 3
0.033
0.043
0.090
0.083
0.046
0.031
0.036
0.046
0.058
0.054
0.060
15
22
47
25
36
38
37
26
34
35
43
33
41
9
46
29
10
45
28
16
17
11
12
30
42
18
49
39
l
4
32
50
48
31
14
19
13
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
J7/09/56 14:00
12/2.5/57 16: 00
11118158 13: 00
11/20/59
2/14/81
11122161
12/15/82
1? 13]/63
12/21/64
1/05/66
11/13/66
8/24/68
12/03/68
1/13/70
12/05/70
2/27 /72
1/13/73
~1/28/73
12/26/74
12/02/75
8/26/77
9/17/78
9/08/79
12/14/79
11/21/80
10/06/81
10128/82
1103/84
6/06/85
1/18/86
10/26/86
11/11/87
8/21/89
1/09/90
11124/90
1/27/92
11/01/92
11/30/93
11/30/94
2/08/96
1102197
10/04/97
5: CO
: 00
2:00
2:00
23:00
4:00
16:00
19:00
16: 00
16:00
22:00
9: 00
7:00
2:00
9: 00
23:00
20:00
2: 00
2: 00
15: 00
21:00
11: 00
0: 00
16:00
1: 00
22:00
16:00
0: 00
0:00
17: 00
6:00
8: 00
15:00
16:00
22:00
4: 00
10:00
6: 00
15: 00
0.064
0.061
0.060
0.060
0.060
0.008
0.058
0.058
0.056
0.056
0.054
0.052
0.052
0.051
0.050
0.049
0.049
0.049
0.048
0.048
0.047
0.047
0.046
0.046
0.044
0.044
o. C44
0.044
0.044
0.043
0.C43
0.043
0.042
0.041
0.040
0.040
0.040
0.039
0.038
0.036
0.033
0.031
0.097
0.089
0.081
0.070
0.068
0.062
0.050
0.042
1J
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Offslte Land Use Condition
0.00
0.00
1. 28
0.00
0.00
0.00
0.00
1. 04
offsite.tsf
ST 1. 000000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000000 Till Forest
0.000000 Till Pasture
0.000000 Till Grass
0.000000 Outwash Forest
0.000000 Outwash Pasture
0.000000 Outwash Grass
0.000000 Wetland
0.000000 Impervious
5.86
S.24
4.75
4.34
3.99
3.70
3.44
3.22
3.03
2.8~
2.70
2.56
2.44
2.32
2.22
2.13
2.04
1. 96
1. 89
1. 82
1. 75
1. 70
1. E4
1. 59
1. 54
1. 49
1. 45
1. 41
1. 37
1. 33
1. 30
1. 27
1. 24
1.21
1. 18
1. 15
1. 12
1.10
1. 08
1.05
1. 03
1. 01
100.00
50.00
25.00
10.00
8.00
5.00
2.00
1. 30
C.829
0.809
0.789
C. 769
0.749
0.729
0.709
0.690
0.670
0.650
0.630
0.610
0.590
0.570
0.550
0.530
0.515
0.490
0.47:]
0.450
0.430
0.410
0.390
0.370
0.350
0.330
0.310
0.291
0.271
0.251
0.231
0.211
0.191
0.171
0.151
0.131
0.111
0.091
0.071
0.051
0.031
0.011
0.990
0.980
0.9EO
0.900
0.875
0.800
0.500
0.231
Flcc'.
Time Series
Project Locat:.on: Sea-'::'ac
---Annua.l Peak Flow Rales---
Flow Rate Rank Tl:r.e of Peak
(e,s)
0.3E1
0.659
0.383
0.266
0.266
0.332
0.335
0.334
0.405
0.346
0.253
0.339
0.299
0.284
0.301
0.329
0.292
0.298
0.455
0.481
0.274
0.301
0.292
0.478
0.262
0,329
0.442
0.275
0.296
0.417
0.347
0.397
0.403
0.570
0.386
0.322
0.260
0.404
0.466
0.202
0.249
0.681
0.612
0.311
0.188
0.218
0.302
0.436
0.389
0.412
20 2/16/49 21: 00
3/03/50 16:00
19 2109/51 2:00
42 10/15/51 13:00
43 3/24153 15:00
26 12/19/53 19:00
24 11/25154 2: 00
25 12/20/55 17:00
13 12/09/56 14: 00
22 12/25/57 16:00
46 11/18/58 13:00
2311/20/595:00
34 2/14161 21: 00
39 11122/61 2:00
33 12/15162 2: 00
28 12/31/63 23:00
38
35
8
41
32
37
6
44
27
9
40
36
11
21
16
15
18
29
45
14
7
49
47
1
3
30
50
48
31
10
17
12
12/21/64
1/05/66
11/13/66
8/24/68
12/03/68
1/13/70
12/06/"10
2/27/72
1/13/73
11/28/73
12/26/74
12/02/75
8/26/77
9/22/78
9/08/79
12/14/79
11/21/80
10/06/81
10/28/82
1/03184
6/06/85
1/18186
10/26/86
1/14/88
8121/89
1/09/90
11/24/90
1/27 192
12/10/92
11 /30 I 9 3
11/30194
2/08/96
1/02197
10104/97
4: 00
16: 00
19:00
16:00
16:00
22:00
8:00
7:00
2:00
9: 00
23:00
20:00
2:00
19:00
15:00
21:00
11: 00
0:00
16:00
1:00
22:00
16:00
0:00
0:00
17:00
6: 00
8:00
15:00
6: 00
22:00
4:00
10:00
6:00
15:00
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
LogPearson III Coefficients
Mean= -0.463 StdDev= 0.]22
Ske,,,,l~ .J. :398
-----F~ow Frequency A~a~ysls-------
- -Peaks R:::.nk Return Prob
(eFS) Period
0.681 89.50 0.989
0.659
0.612
0.570
0.481
0.478
0.466
0.455
0.442
0.436
0.417
0.412
0.405
0.404
0.403
0.397
0.389
0.386
0.383
0.361
0.347
0.346
0.339
0.335
0.334
0.332
0.329
0.329
0.322
0.311
0.302
0.301
0.301
0.299
0.298
0.296
0.292
0.292
0.284
0.275
0.274
0.266
0.266
0.262
0.260
0.253
0.249
0.218
0.202
0.188
0.718
0.650
0.584
0.499
0.482
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
32.13
19.58
14.08
10.99
9.01
7.64
6.63
5.86
5.24
4.75
4.34
3.99
3.70
3.44
3.22
3.03
2.85
2.70
2.56
2.44
2.32
2.22
2.13
2.04
".96
1. 89
1. 82
1. 75
1. 70
1. 64
1. 59
1. 54
1. 49
1. 45
1. 41
1. 37
1.33
1. 30
1. 27
1. 24
1. 21
1. 18
1. 15
1. 12
1. 10
1. 08
1. 05
1. 03
1. 01
100.00
50.00
25.00
10.00
8.00
0.969
0.949
0.929
0.909
0.889
0.869
0.849
0.829
0.809
0.789
0.769
0.749
0.729
0.709
0.690
0.670
0.650
0.630
0.610
0.590
0.570
0.550
0.530
0.510
0.490
0.470
0.450
0.430
0.410
0.390
0.370
0.350
0.330
0.310
0.291
0.271
0.251
0.231
0.211
0.191
0.171
0.151
0.131
0.111
0.091
0.071
0.051
0.031
0.011
0.990
0.980
0.960
0.900
0.875
Computee Ped:l{::;
Computed Peaks
Computed Peaks
0.133
0.3J8
0.277
.s.L10
2.00
1. 30
0.800
c.soc
0.23_
As stated in Section 4, the predeveloped and developed flows have been combined
with the offslte flow (which is flow-through, no detention requirements).
Predevcomblned Flow Frequency Analysis
predev.tsf + offsite.tsf = predevcombined.tsf
Flow Frequency Analysis
Time Series File:predeveombined.tsf
Pro] ect Loeatlon: Sea-Tae
LogPearson III Coefficients
Mean= -0.370 StdOev= 0.145
Skew= 0.510
---P.nnual Peak Flo",' Rates--------Flow F!:eq"Ueney Analysis-------
Flm·[ Ra'Ce Rank TiP.l.e of Peak
(CFS)
0.491 16 2/16/49 21:00
0.936 3/03/50 16:00
0.59E 2/09/51 14:00
0.349 38 1/30/52 8:00
0.309 43 3/24/53 15:00
0.410 24 12/19/53 19:00
0.489 17 2/07/55 17:00
0.495 15 12/20/55 17:00
0.524 13 12/09/56 14:00
0.396 26 12/25/57 16:00
0.317 42 1/26159 20:00
0.507 14 11/20/59 21:00
0.377 32 2/14161 21:00
0.285 45 11/22/61 2:00
0.378 28 12/15/62 2:00
0.415 21 12/31/63 23:00
0.341 40 12121164 4:00
0.378 29 1/05/66 16:00
0.550 JO 1/19/67 14:00
0.482 18 8/24/68 16:00
0.370 35 12/03/68 16:00
0.378 30 1/13170 23:00
0.367 36 12/06/70 8:00
0.674 6 2/27172 7:00
0.341 41 1/13/73 2:00
0.378 31 11/28/73 9:00
0.604 8 12/26/74 23:00
0.374 33 12/02/75 20:00
0.297 44 8/26177 2:00
0.419 20 9/22/78 19:00
0.348 39 9/08/79 15:00
0.478 19 12/14/79 21:00
0.412 23 11/21/80 11:00
0.708 4 10/06/81 15:00
0.387 27 10/28/82 16:00
0.396 25 1/03184 1:00
0.262 47 6/06/85 22:00
0.618 7 1/18/86 16:00
0.550 11 11/24/86 3:00
0.261 48 1/14188 12:00
0.249 49 8/21/89 17:00
0.965 1/09/90 6:00
0.854 11/24/90 8:00
0.372 34 1/27192 16:00
- -Peaks Rank Return Prob
(CFS) Perlod
0.965 89.50 0.989
0.936
0.854
0.708
0.704
0.674
0.618
0.604
0.596
0.550
0.550
0.536
0.524
0.507
0.495
0.491
0.489
0.482
0.478
0.419
0.415
0.412
0.02
0.00
0.396
0.396
0.387
0.378
0.378
0.378
0.378
0.377
0.374
0.372
0.370
0.367
0.361
0.349
0.348
0.341
0.34 J
0.317
0.309
0.297
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
32.13
19.58
14.08
10.99
9.01
7.64
6.63
5.8 E
5.24
4.75
4.34
3.99
3.70
3.44
3.22
3.03
2.85
2.70
2.56
2.44
2.32
2.22
2.13
2.04
1. 96
1. 89
1. 82
1. 75
1. 70
1. 64
1. 59
1. 54
1. 49
1. 45
1. 41
1. 37
1. 33
1. 30
1.27
1. 24
1. 21
1.18
1.15
0.969
0.949
0.929
0.909
0.889
0.869
0.849
0.829
0.809
0.789
0.769
0.749
0.729
0.709
0.690
0.670
0.650
0.630
0.610
0.590
0.570
0.550
0.530
0.510
0.490
0.470
0.450
0.430
0.410
0.390
0.370
0.350
0.330
0.310
0.291
0.271
0.251
0.231
0.211
0.191
0.171
0.151
0.131
0.269 4E 3/22/93 22:00
0.219 50 11/30/93 22:00
0.361 3"/ 2118/95 70:80
0.704 2/08/96 1J: JO
0.536 12 1/02/97 6:00
0.412 ?) ]0/04/97 15:00·
Compt:.ted Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Devcomblned Row Frequency Analysis
dev.lsl + of/site.tsl = devcombined.tsl
Flow Frequency Analysis
Time Serles FL.e:devcombined.tsf
Pro] ect locatlon: Sea-Tae
0.28.5
0.269
0.262
J.261
0.249
0.219
1. 05
0.926
o. B09
0.664
0.636
0.559
0.414
0.329
1;5
46 1. 10
i, 7 .08
48 1.05
49 1.03
50 1.01
100.00
50.00
25.00
10.00
8.00
5.00
2.00
I. 30
LogPearson =11 Coefficients
0.111
0.091
0.071
0.051
0.031
0.011
0.990
0.980
0.960
0.900
0.875
0.800
0.500
0.231
Mean= 0.083 StdfJev= 0.113
Skew= O.40~
---Annual Peak Flow Rate~--
Flow Rate Rank Time of Peak
ICfS)
-----Flow Frequency Analysis-------
1. 25
2.14
1. 29
0.972
J.944
1.16
1.19
1.16
1. 39
1. 22
0.899
1.18
1. 04
1. 01
1. 04
1.16
] .03
1. 04
1. 59
1.72
0.956
1. 06
1. 01
1. 60
0.925
1.13
1. 50
0.956
1. 09
1. 4 9
1. 30
1. 37
1. 42
1. 99
1. 39
1.12
0.945
21 2/16/49 21:00
3/03/50 16:00
20 2/09/51 2:00
40 10115/51 13:00
45 3/24/53 15:00
25 12/19/53 19:00
23 11/25/54 2:00
26 11/18/55 15:00
14 12/09/56 14:00
22 12125/57 16,00
47 11118/58 13:00
24 11/20/59 5:00
35 2/14161 21,00
38 11/22/61 2:00
36 12/15/62 2:00
27 12/31/63 23:00
37 12/21/64 4:00
34 1/05166 16:00
8 11/13/66 19:00
8/24/68 16:00
41 12103/68 16:00
33 1/13/70 22:00
39 12/06/70 8:00
7 2/27172 7:00
46 1/13/73 2:00
28 11/28/73 9:00
9 12/26/74 23:00
42 12/02/75 20:00
31 8/26/77 2:00
10 9/17/78 2:00
19 9/08/79 15:00
16 12/14/79 21:00
13 11/21/80 11:00
10/06/81 0:00
15 10/28/82 16:00
29 1/03/84 1:00
44 6/06/85 22,00
- -Peaks Rank Return Prob
(CFS) Perlod
2,25
2.14
2.05
I. 99
I. 72
1. 69
I. 60
1. 59
I. 50
1. 49
I. 45
I. 43
1. 42
I. 39
1. 39
1. 37
I. 37
1. 33
1. 30
1. 29
I. 25
1. 22
1.19
I. 18
1.16
1.J6
1.16
1.13
1.12
1. 09
I. 09
1. 08
1. 06
1. 04
I. 04
1. 04
1. 03
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
89.50
32.13
19.58
14.08
10.99
9.0:
7.64
6.63
5.86
5.24
4.75
4.34
3.99
3.70
3.44
3.22
3.03
2.85
2.70
2.56
2.44
2.32
2.22
2.13
2.04
1. 96
J. 89
1. 82
1. 75
J. 70
1. 64
J. 59
1. 54
1. 49
J. 45
J. 41
J. 37
0.989
0.969
0.949
0.929
0.909
0.889
0.869
0.849
0.829
0.809
0.789
0.769
0.749
0.729
0.709
0.690
0.670
0.650
0.630
0.610
0.590
0.570
0.550
0.530
0.510
0.490
0.470
0.450
0.430
0.410
0.390
0.370
0.350
0.330
0.310
0.291
0.271
l. 37 17 1/18/86 :6:0C
1.69 6 1:-)/26/86 O:OC
0.735 LJ9 11/11/87 0:00
8/21189 :7:00
1/09/90 6:00
11/24/90 8: 00
0.952 43
2.25
2.05
1.09 30 J!27/g2 15:00
11/01/92 16:00
11130/93 22:00
11130/94 4:00
0.690 50
0.807 48
1. 08 32
1. 45 11 2/08/96 10: 00
1/02197 6:00
10/04/97 15: 00
1. 33 18
1.43 12
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
Devcombined 15 min Flow Rates
Flovl Frequency Analysis
Time Series File:dev15comblned.tsf
Proj ect Locat jon: Sea-Tae
---An~ual Peak Flow Rates---
Flow Rate
(eFS)
3.19
4.30
1. 86
2.18
1. 58
1. 81
1. 53
2.29
2.20
2.03
2.59
2.61
2.20
1. 83
1. 79
1. 40
2.07
1. 39
2.40
4.88
2.14
1. 28
1. 55
3.29
1. 84
2.23
2.38
1. 64
1. 50
2.67
3.66
Rank Time of Peak
2116/49 17:45
3/03/50 15:00
35 8/27/51 18:00
28 10/17/51 7:15
43 9/30/53 3:00
38 12/19/53 17:30
46 7/30/55 21:15
20 10/04/55 10:00
25 12/09/56 12:45
32 1/16/58 10:00
14 10118/58 19:45
J3 10/10/59 22:00
26 2/14/61 20:15
37 8/04/62 13: 15
39 12/01/62 20:15
48 6/05/64 15:00
30 4/20/65 19:30
49 1/05/66 15:00
17 11/13/66 17:45
3 8/24/68 15:00
29 10/20/68 12:00
50 1/13/70 20:45
45 12/06/70 7:00
7 12/08/71 17: 15
36 4/18/73 9:30
22 11/28/73 8:00
18 8/17/75 23:00
42 10/29/75 7:00
47 8/23/77 14:30
11 9/17/78 1:00
6 9/08/79 13:45
1.01
l.Ol
0.972
0.956
0.9S6
0.952
0.945
0.944
0.925
0.899
0.807
0.735
0.690
2.39
2. :8
1. 98
J .71
1. 65
1. 50
1. 19
0.988
38 "[ .33
39 1. 30
40 1.27
41 J .24
<12 l. 21
43 1.18
44 1.15
45 J .17
46 1.10
47 1. 08
48 1.05
49 1.03
50 1. 01
100.00
50.00
25.00
~O.OO
8.0C
5.00
2.00
1. 30
0.251
0.231
0.211
0.191
0.171
0.151
0.131
O. J J 1
0.091
0.071
0.051
0.031
0.011
0.990
0.980
G.960
0.900
0.87 -5
0.800
0.500
0.231
LogPearson III Coefflclents
Mean= 0.361 StdDev= 0.164
Skew= 1.384
-----Flow Frequency Analysis-------
- -Peaks Rank Return Prob
(CFS) Perlod
9.11 89.50 0.989
5.48
.88
4.44
4.30
3.66
3.29
3.22
3. J 9
2.71
2.67
2.62
2.61
2.59
2.47
2.41
2.40
2.38
2.35
2.29
2.29
2.23
2.23
2.20
2.20
2.20
2.19
2.18
2.14
2.07
2.06
10
11
12
13
14
15
16
J 7
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32.13
19.58
14.08
10.99
9.01
7.64
6.63
5.86
5.24
4.75
4.34
3.99
3.70
3.44
3.22
3.03
2.85
2.70
2.56
2.44
2.32
2.22
2.13
2.04
1. 96
1. 89
1. 82
1. 75
1. 70
1. 64
C.969
0.949
0.929
0.909
0.889
0.869
0.849
0.829
0.809
0.789
0.769
0.749
0.729
0.709
0.690
0.670
0.650
0.630
0.610
0.590
0.570
0.550
0.530
0.510
0.490
0.470
0.450
0.430
0.410
0.390
2.62 12 12/14/79 20:00 2.03 32 ] .59 0.370
2.47 15 9/21/8: 8: 00 2.03 33 1. !J4 0.350
5.48 10/03/8~ 22:15 1. 94 3,; 1. 4 9 0.330
2.23 23 10/28/82 :6:00 1. 86 35 1. 45 O.31C
1 .70 40 1/02/84 23:30 1. 84 3C 1. 41 0.291
1 .58 H 6/06/85 21 : 15 1. 83 37 1. TI 0.271
2.35 19 1C/27/8~ 10:45 1. 81 38 1. 33 0.251
2.71 10 lC/25/86 22: 45 1. 79 39 1. 30 0.231
2.19 27 5/:3/88 17: 30 1. 70 40 1.27 0.211
2.03 33 8/21/89 16:00 1. 69 41 1. 24 0.191
3.22 1109/90 5:30 1. 64 42 1. 21 0.171
2.20 24 4/03/91 20: 15 1. 58 43 1.18 0.151
1. 69 41 1127/92 15:00 1. 58 44 1.15 0.131
2.06 31 6/09/93 12: 15 1. 55 45 1.12 0.111
1. 94 34 11/17/93 16: 45 1. 53 46 1.10 0.091
2.29 21 6/05/95 17: 00 1. 50 47 1.08 0.071
2.41 16 7/19/96 19:30 1. 40 48 1. 00 0.051
9.11 12/29/96 11: 45 1. 39 49 1. 03 0.031
4.44 10/04/97 14: 15 1. 28 50 1. 01 0.011
Computed Peaks 7.90 100.00 0.990
Computed Peaks 6.38 50.00 0.980
Computed Peaks 5.14 25.00 0.960
Computed Peaks 3.81 10.00 0.900
Computed Peaks 3.59 8.00 0.870
Computed Peaks 3.00 5.CO 0.800
Computed Peaks 2.11 2.00 0.500
Computed Peaks 1. 72 1. 30 0.231
Flows used for Target Duration Curve Calculation
50% of 2 year predev.tsf + 2 year offsite.tsf
0.059 + 0.338 = 0.397 cis <--first interval
50 year flow: 50 year predev.tsf + 50 year offsite.tsf
0.333 + 0.650 = 0.983 cis
Interval Size: (50 year -first intervaO/35
(0.983 -0.397)/35
0.0167
laRosa Pond Facility
Retent-icr:/Dele::1tic::1 Facility
Type 0:: Facili "ty: Detcntlon Pond
SlCie Slope: 3.00 H: 1V
Pond Bottom Length: 108.00 ft
Pond Bottom Width: 30. 00 ft
Pond Bottem Area: 3240. sq. ft
Top Area at 1 ft. FB: 10800. sq. ft
0.248 acres
Effec'(ive Storage Depth: 6.00 ft
Stage 0 Elevatlon: 0.00 ft
Storage Volume: 36936. cu. ft
0.848 ac-ft
Riser l-iead: 6.0C ft
Riser Dlamcter: :8.00 inches
Number of orifices:
Ful) Head Pipe
Orifice Height
1ft)
0.00
5.20
Diameter
(in)
2.50
1. 75
Discharge Diameter
leFS) lin)
0.415
0.074 4.0
Top Notch Weir: Rectangular
Length: '7.00 in
Welr Helght: 5.75 ft
Outflow Rating CLi.rve: None
Stage Elevatlon Storage Discharge Percolation
I £t) 1ft) (cu. ft) (ac-tt) (cis) (efs)
0.00 0.00 O. 0.000 0.000 0.00
0.03 0.03 98. 0.002 0.027 0.00
0.05 0.05 163. 0.004 0.039 0.00
0.08 0.08 262. 0.006 0.047 0.00
0.10 0.10 328. 0.008 0.055 0.00
0.13 0.13 428. 0.010 0.061 0.00
o .lE 0.16 529. 0.012 0.067 0.00
0.18 0.18 597. 0.014 0.072 0.00
0.21 0.21 699. 0.016 0.077 0.00
0.33 0.33 1115. 0.026 0.097 0.00
0.44 0.44 1507. 0.035 0.113 0.00
0.56 0.56 1946. 0.045 0.127 0.00
0.68 0.68 2398. 0.055 0.140 0.00
0.80 0.80 2863. 0.066 0.151 0.00
0.91 0.91 3300. 0.076 0.162 0.00
1. 03 1. 03 3790. 0.087 0.172 0.00
1. 15 1. 15 4292. 0.099 0.182 0.00
1.27 1. 27 4807. 0.110 0.191 0.00
1. 38 1. 38 5291. 0.121 0.199 0.00
1. 50 1. 50 5832. 0.134 0.208 0.00
1. 62 1. 62 6386. 0.147 0.216 0.00
1. 74 1. 74 6954. o .lEO 0.223 0.00
1. 86 1. 86 7536. 0.173 0.231 0.00
1. 97 1. 97 80B1. 0.186 0.238 0.00
2.09 2.09 8690. 0.199 0.245 0.00
2.21 2.21 9312. 0.214 0.252 0.00
2.33 2.33 9949. 0.228 0.259 0.00
2.44 2.44 10545. 0.242 0.265 0.00
2.56 2.56 11209. 0.257 0.271 0.00
2.68 2.68 11888. 0.273 0.277 0.00
2.80 2.80 12581. 0.289 0.283 0.00
Surf Area
Isq. ft)
3240.
32E5.
3281.
3306.
3323.
3348.
3373.
3390.
3415.
3517.
3611.
3715.
3820.
3925.
4023.
4131.
4240.
4350.
4451.
4563.
4676.
4790.
4905.
5011.
5128.
5246.
5365.
5475.
5596.
5718.
5841.
2.9]
3.03
3.15
3.27
3.38
3.00
3.62
3.74
3.86
3.97
4.09
4 . 2~
4.33
4.44
4.56
4.68
4.80
4.91
5.03
5.15
5.20
5.22
5.24
5.25
~.27
5.29
5.31
5.33
5.35
5.36
5.48
5.60
5.72
5.75
5.78
5.81
5.84
5.88
5.91
5.94
5.97
6.00
6.10
6.20
6.30
6.40
6.50
6.60
6.70
6.80
6.90
7.00
7.10
7.20
7.30
7.40
7.50
7.60
7.70
7.80
7.90
8.00
2.91
3.03
3.15
3.27
3.38
3.50
3. (;2
3.74
3.86
3.97
4.09
4.21
4.33
4.44
4.56
4.68
4. 80
4.9]
5.03
5.15
5.20
5.22
5.24
5.25
5.27
5.29
5.31
5.33
5.35
5.36
5.48
5.60
5.72
".") 5
5.78
5.81
5.84
5.88
5.91
5.94
5.97
6.00
6.10
6.20
6.30
6.40
6.50
6.60
6.70
6.80
6.90
7.00
7.10
7.20
7.30
7.40
7.50
7.60
7.70
7.80
7.90
B.OO
13230.
13957..
14689.
15441.
16144.
16926.
17723.
18536.
19365.
20139.
20998.
21874.
22765.
23597.
24521.
25461.
26418.
27310.
28299.
29305.
29730.
29900.
30072.
30157.
30329.
30501.
30674 .
30848.
3] 021.
31108.
32163.
33234.
34324.
34599.
34875.
35153.
35431.
35805.
36086.
36368.
36651.
36936.
37893.
38862.
39844.
40839.
41847.
42868.
43902.
44949.
46009.
47082.
48169.
49269.
50382.
51509.
52650.
53804.
54972.
56154.
57350.
58560.
0.304 0.289
0.320 0.295
0.337 0.30:
0.354 0.306
0.371 0.312
0.389 0.317
0.407 0.323
0.426 0.328
0.445 0.333
0.462 0.338
0.482 0.343
0.502 0.348
0.523 0.353
0.542 0.357
0.563 0.362
0.585 C.367
0.606 0.371
0.627 0.376
0.650 0.380
0.673 0.385
0.683 0.387
0.686 0.388
0.690 0.390
0.692 0.394
0.696 0.399
0.700 0.406
0.704 0.413
0.708 0.421
0.712 0.424
0.714 0.426
0.738 0.441
0.763 0.454
0.788 0.465
0.794 0.468
0.801 0.481
0.807 0.503
0.8]3 0.530
0.822 0.560
0.828 0.594
0.835 0.630
0.841 0.668
0.848 0.709
0.870 1.180
0.892 2.030
0.915 3.130
0.938 4.430
0.961 5.910
0.984 7.340
1.008 7.880
1.032 8.380
1.056 8.850
1.081 9.290
1.106 9.710
1.131 10.lIO
1.157 10.500
1.]82 10.870
1.209 11.230
1.235 11.580
1. 262 11. 920
1.289 12.240
1.317 12.560
1.344 12.870
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5954.
6079.
62':5.
6333.
6450.
6579.
67:]9.
6840.
6972 .
7095.
7229.
7364.
7500.
7626.
7764.
7904.
8044.
8173.
8316.
8459.
8519.
8543.
8567.
8579.
8603.
8628.
8652.
8676.
8700.
8712.
8859.
9006.
9154.
9191.
9229.
9266.
9303.
9353.
9391.
9429.
9466.
9504.
9630.
9757.
9885.
10014.
10143.
10273.
10404.
10535.
10667.
10800.
10934.
lI068.
lI203.
11339.
11475.
11612.
lI750.
lISB9.
12028.
12168.
Hyd Inflow O~tflow Peak
Target Calc Stage ~lev
1.99 1.J2 6.J7 6.07
2.05 J.~7 0.81 6.J2 6.02
1.29 0.80 6.02 6.02
1.18 0.57 5.89 5.89
1.28 0.53 5.84 5.84
1.37 0.38 4.90 4.90
1.49 0.31 3.38 3.38
0.69 0.29 2.88 2.88
Route Tlme Serles through Facility
Inflow Time Series Flle:devcombined.tsf
Outflow Time Series File: rdout
Storage
(Cu-fit) (F.c-!:,'t)
37567. 0.862
37151.
3713C.
35913.
35472.
27227.
16125.
13038.
0.853
0.852
0.824
0.814
0.625
0.370
0.299
Inflow/OJtflow Analysis
Peak Inflow Dlscharge:
Peak Outtlo;.,' Olscharge:
2.26 CFS at 6:00 on Jan
1.02 CFS at 16:00
6.07 Ft
Oct.
El :'990
1981
Peak Reservoir Stage:
Peak Reservoir Elev: 6.07 Ft
Peak ReserVOlr Storage: 37567. Cu-Ft
0.862 Ac-Ft
Flow Frequency Analysis
Tlme Series File:rdout.tsf
Project Location:5ea-Tac
---Annual Peak Flow Rates---
Flow Rate
(CFS)
0.316
0.337
0.805
0.281
0.290
0.288
0.371
0.333
0.336
0.322
0.299
0.573
0.316
0.256
0.306
0.299
0.325
0.265
0.355
0.280
0.315
0.300
0.313
0.381
0.287
0.269
0.362
0.300
0.249
0.312
0.263
0.376
Rank Time of Peak
23 2/17/49 0:00
14 3/04/50 3:00
4 2/09/51 19:00
42 1/30/52 10:00
37 9130/53 10:00
38 1/0E/54 7:00
11 2/07/55 23,00
17 11/02/55 23:00
15 12/09/56 17:00
21 1/16/5821:00
31 10/19/58 8:00
6 11/20/59 22:00
22 11/20/60 16:00
47 1/02/62 23:00
27 11/25/62 15:00
32 1/01/64 20:00
20 11124/64 9:00
45 1/05/66 18:00
13 1/19/67 17: 00
43 2/04/68 0:00
24 12/03/68 21,00
29 1/14/70 1,00
25 12/06/70 12:00
2/28/72 7:00
39 12/26/72 6: 00
44 1/15(74 4: 00
12 12/27 /74 3: 00
30 12/02/75 23:00
48 8124/77 0:00
26 9/23/78 11:00
46 11/19/78 8:00
10 12/15/79 10:00
LogPearson III Coefficients
Mean= -0.462 StdDev= 0.149
Skew= 1.784
-----Flow Frequency Analysis-------
--Peaks --Rank Return Frob
(CFS) (ft) Period
1.02 6.07 89.50 0.989
0.848 6.03 32.13 0.%9
0.815 6.02 19.58 0.949
0.805
0.680
0.573
0.533
0.467
0.381
0.376
0.371
0.362
0.355
0.337
0.336
0.334
0.333
0.331
0.329
0.325
0.322
0.316
0.316
0.315
0.313
0.312
0.306
0.304
0.300
0.300
0.299
0.299
6. 02
5.98
5.89
5.84
5.74
5.06
4.90
4.80
4.56
4.38
3.95
3.93
3.88
3.86
3.81
3.75
3.68
3.61
3.48
3.47
3.46
3.41
3.38
3.27
3.22
3.13
3.12
3.11
3.11
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
14.08
10.99
9.01
7.64
6.63
5.86
5.24
4.75
4.34
3.99
3.70
3.44
3.22
3.03
2.85
2.70
2.56
2.44
2.32
2.22
2.13
2.04
1. 96
1. 89
1. 82
1. 75
1. 70
1. 64
1. 59
0.929
0.909
0.889
0.869
0.849
0.829
0.809
0.789
0.769
0.749
0.729
0.709
0.690
0.670
0.650
0.630
0.610
0.590
0.570
0.550
0.530
0.510
0.490
0.470
0.450
0.430
0.410
0.390
0.370
0.292 36
1,02 1
0.331 18
0.283 40
0.304 28
0.467 8
0.533
0.282 41
0.230 49
0.680
0.815
0.292 35
0.296 33
0.215 50
0.329 19
0.848
0.334 1E
0.293 34
Computed Peaks
Computed Peaks
Computed Peaks
Computed Pec:..ks
Computed Peaks
Computed Peaks
Computed Peaks
Computed Peaks
11121180 13:CO
10/06/81 16: 00
1/05/83 1C: CO
1/24/84 12: 00
6/07/85 7:00
1/18/8622:00
11/24/86 7:00
1/14/88 14: 00
] 1/05/88 18: 00
1109/90 11: 00
11/24/90 15: 00
1/27/92 19:00
3/23/93 1:00
12101193 15: 00
12/27/94 6:00
2/09/96 2: 00
3/19/97 14: 00
10/30/97 9:00
0.296
0.293
0.292
0.292
0.290
0.288
0.287
0.283
0.282
0.281
0.280
0.269
0.265
C.263
0.256
0.249
0.230
0.215
1.15
0.918
0.733
0.543
0.513
0.431
0.314
0.267
3.06
3.00
2.97
2.96
2.94
2.89
2.85
2.80
2.78
2.75
2.75
2.53
2.43
2.4 J
2.28
2.16
1.84
1. 61
E. 09
6.04
6.01
5.86
5.82
5.40
3.42
2.48
33 1 .54
34 1. 49
35 1. 45
36 1. 0
37 1.
38 1. 33
39 1. 30
40 1.27
41 1.24
42 1.21
43 1. 18
44 1. 15
45 1.12
4 E 1.] 0
47 1. 08
48 1.05
49 1. 03
50 1. 01
100.00
50.00
25.00
10.00
8.00
5.00
2.00
] .30
Flow Dura~ion from T1me Series Flle:rdout.tsf
Cutoff Count Frequency CDF Exceedence Probabill:y
CFS
0.014 344713
0.043
0.071
0.100
0.128
0.157
0.185
0.214
0.242
0.271
0.299
0.328
0.356
0.385
0.413
0.441
0.470
0.498
0.527
0.555
0.584
0.612
0.641
0.669
0.698
0.726
0.755
0.783
0.812
0.840
0.868
0.897
0.925
31026
17321
134 EB
9871
7500
5127
3442
2255
1278
907
524
246
179
28
23
47
9
78.702
7.084
3.955
3.075
2.254
1.712
1. J 71
0.786
0.515
0.292
0.207
0.120
0.056
0.041
0.006
0.005
o. all
0.002
0.001
0.001
0.002
0.000
0.000
0.000
0.002
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
78.702
85.785
89.740
92.815
95.068
96.781
97.951
98.737
99.252
99.5,4
99.751
99.870
99.926
99.967
99.974
99.979
99.990
99.992
99.993
99.994
99.996
99.996
99.996
99.997
99.998
99.999
99.999
99.999
99.999
100.000
100.000
100.000
100.000
21.298
14.215
10.260
7.] 85
4.932
3.219
2.049
1.263
0.748
0.456
0.249
0.130
0.074
0.033
0.026
0.021
0.010
0.008
0.007
0.006
0.004
0.004
0.004
0.003
0.002
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0.213E+00
0.142E+OO
O.103E+OO
0.719E-01
0.493E-01
0.322E-01
0.205E-01
0.126E-01
0.748E-02
0.456E-02
0.249E-02
0.130E-02
0.735E-03
0.326E-03
0.263E-03
0.210E-03
0.103E-03
0.822E-04
0.731E-04
0.594E-04
0.434E-04
0.388E-04
0.365E-04
0.320E-04
0.160E-04
o . 137E-04
0.114E-04
0.114E-04
0.685E-05
0.457E-05
0.228E-05
0.228E-05
0.228E-05
0.350
0.330
0.310
0.291
0.271
0.251
0.231
0.211
0.191
0.171
0.151
0.131
0.111
0.091
0.071
0,051
0.031
0.011
0.990
0.980
0.960
0.900
0.875
0.800
0.500
0.231
0.954
0.982
1. 01
0.000
o.oeo
o.oeo
8'_-o-boo~-~ ______ _
lCO.OOO
lCO.OOO
1CO.000
e.ooe
C.OGC
o.ooe
~.--------------------------
~
~ \1
~
'i ~
~
~
~ -:-" ". ,
Duration Comparison Anaylsis
Base File: predevcombined. tsf
New File: rdout. tsf
Cutoff Units: Discharge in CFS
O. 8S-0S
O. 8E-05
O. 8E-Oo
-----Fractlon of Time--------------Check of Tolerance-------
Cutoff Base New 'oChange Probability Base
0.396 0.36E-03 0.29E-03 -19.2 [ 0.36E-03 0.396
0.440 0.22E-03 0.21E-03 -6.1 [ 0.22E-03 0.440
0.484 0.14E-03 0.94£-04 -33.9 [ 0.14E-03 (1.484
0.528 0.84E-04 0.73E-04 -13.5 [ 0.84E-04 0.528
0.571 0.64E-04 0.53E-04 -17.9 [ 0.64E-04 0.571
0.615 0.39E-04 0.39E-04 0.0 [ 0.39E-04 0.615
0.659 0.25E-04 0.34E-04 36.4 [ 0.2SE-04 0.659
0.703 0.21E-04 0.16E-04 -22.2 [ 0.21E-04 0.703
0.746 0.14E-04 o .14E-04 0.0 [ 0.14E-04 0.746
0.790 0.14E-04 0.l1E-04 -16.7 [ 0.14E-04 0.790
0.834 o .14E-04 0.46E-05 -66.7 [ 0.14E-04 0.834
0.878 0.68E-05 0.23E-05 -66.7 [ 0.68E-05 0.878
0.921 0.46E-05 0.23E-05 -50.0 [ 0.46E-05 0.921
0.965 0.23E-05 0.23E-05 0.0 [ 0.23E-05 0.965
Maximum positive excursion = 0.083 cfs ( 8.9%)
occurring at 0.936 cfs on the Base Data: predevcombined. tsf
and at 1.02 cfs on the New Data: rdout. tsf
Maximum negative excursion = 0.096 cfs (-11.3%)
at 0.846 cfs on the Base Data:predevcombined.tsf
.750 cfs on the New Data:rdout.tsf
New 'bChange
0.381 -3.9
0.433 -1. 6
0.459 -5.2
0.493 -6.6
0.534 -6.5
0.626 1.8
0.679 3.1
0.693 -1.4
0.750 0.5
0.750 -5.0
0.750 -10.0
0.813 -7.3
0.847 -8.0
1. 02 5.7
.",,"c' 'I
APPENDIXB
Geotechnical Reports
Earth Solutions NW, LLC
• Geotechnical Engineering
(i-cology
l:.nvironmcntal Scientists
Construction Monitoring
GEOTECHNICAL ENGINEERING ST
PROPOSED ROSA PLAT
2724 BENSON ROAD SOUTH
RENTON, WASHINGTON
ES-2972
PREPARED FOR
CONNER HOMES GROUP, LLC
clo WESTPAC DEVELOPMENT
September 10, 2013
Kyle R. Campbell, P.E.
Principal
GEOTECHNICAL ENGINEERING STUDY
PROPOSED ROSA PLAT
2724 BENSON ROAD SOUTH
RENTON, WASHINGTON
ES-2972
Earth Solutions NW, LLC
1805 -1361h PI. Northeast, Suite 201
Bellevue, Washington 98005
Ph: 425-449-4704 Fax: 425-449-4711
Toll Free: 866-336-8710
Important Information About Your
Geotechnical Engineering Report
Geotechnical Services Are Perllrmad lor
Spaic Purposes, Persons, and Prajects
Geotechnical engineers strucltire their services to meet the specific needs of
their clients. A geotechnical engineering study conducted for a civil engi-
neer may not fulfill the needs of a construction contractor or even another
civil engineer. Because each geotechnical engineering study is unique, each
geotechnical engineering report is unique, prepared solelyfor the client No
one except you should rely on your geotechnical engineering report without
first conferring with the geotechnical engineer who prepared it. And no one
-not even you -should apply ttle report for any purpose or project
except the one originally contemplated.
iliad tba Full Report
Serious problems have occurred because those relying on a geotechnical
engineering report did not read it all. Do not rely on an executive summary.
Do not read selected elements only.
A GeotacII*:III EltlIII~ 18 Balad on
A Unique Bat ......... Factors
Geotechnical engineers consider a number of unique, project-specific fac-
tors when establishing the scope of a study. Typical factors include: the
clienfs goals, objectives, and risk management preferences; the general
nature of the structure involved, Its size, and configuration; the location of
the structure on the site; and other planned or existing site improvements,
such as access roads, parking lots, and underground utilities. Unless the
geotechnical engineer who conducted the study specifically indicates oth-
erwise, do not rely on a geotechnical engineering report that was:
• not prepared for you,
• not prepared for your project,
• not prepared for the specific site explored, or
• completed before important project changes were made.
Typical changes that can erode the reliability of an existing geotechnical
engineering report include those that affect
• the function of the proposed structure, as when it's changed from a
parking garage to an office building, or from a light industrial plant
to a refrtgerated warehouse,
• elevation, configuration, location, orientation, or weight of the
proposed structure,
• composition of the design team, or
• project ownership.
/ls a general rule, always inform your geotechnical engineer of project
changes--even minor ones--end request an assessment of thetr impld.
Geotechnical engineers cannot accept responsibility or liability for problems
that occur because their repotts do not consider developments of Which
they lvere not irrfarmed.
hbSlll"lace Conditions can CIIange
A geotechnical engineering report is based on conditions that existed at
the time ttle study was pertormed. Do nat rely on a geotechnical engineer-
ing repol1whose adequacy may have been affected by: the passage of
time; by man-made events, such as construction on or adjacent to the site;
or by natural events, such as floods, earthquakes, or groundwater fluctua-
tions. Always contact the geotechnical engineer before applying the report
to determine ij it is still reliable. A minor amount of additional testing or
analysis could prevent major problems.
Molt GrIotac:IDcaI FiIII_ Ar8 ProIUsIonaI --Site exploration identifies subsurtace conditions only at those points where
subsurtace tests are conducted or samples are taken. Geotechnical engi-
neers review field and laboratory data and then apply their professional
judgment to render an opinion about subsurface condITions throughout the
site. Actual subsurtace conditions may differ~ometimes significantly-
from those indicated in your report. Retaining the geotechnical engineer
who developed your report to provide construction observation is the
most effective method of managing the rtsks associated with unanticipated
conditions.
A IlellaPt's RacDnmendatIon8 Are Not RnaI
Do not overrely on the construction recommendations included in your
report. Those recommendations are not final, because geotechnical engi-
neers develop thenn principally from judgment and opinion. Geotechnical
engineers can finalize their recommendations only by observing actual
subsurface conditions revealed during construction. TIle geotechnical
engineer who developed your report cannot assume responsibility or
liability for the report's recommendations if that engineer does not perform
construction observation.
A Geotechnical EngiIaerIng Report Is Mject to
Mislnterpratallon
Other design team members' misinterpretation of geotechnical engineering
reports has resulted in costly problems. Lower that risk by having your geo-
technical engineer confer with appropriate members of the design team after
submitting the report Also retain your geotechnical engineer to review perti-
nent elements of the design team's plans and specifications. Contractors can
also miSinterpret a geotechnical engineering report. Reduce that risk by
having your geotechnical engineer participate in prebid and preconstructibn
conferences, and by providing construction observation.
Do Not Redraw the Engineer's Logs
Geotechnical engineers prepare final boring and testing logs based upon
their interpretation of field logs and laboratory data. To prevent errors or
omissions. the logs included in a geotechnical engineering report should
neverbe redrawn for inclusion in architectural or other design drawings.
Only photographic or electronic reproduction is acceptable, bilt rocognize
that separating togs from the report can elevate risk.
GIve Conll'actlrs a C_ete Report and
GuIdance
Some owners and design professionals mistakenly believe they can make
contractors liable for unantiCipated subsurface conditions by limiting what
they provide for bid preparation. To help prevent costly problems, give con-
tractors the complete geotechnical engineering report, butpreface it with a
clearly written leUer of transmittal. In that letter. advise contractors that the
report was not prepared for purposes of bid development and fhat the
report's accuracy is limited; encourage them to confer with the geotechnical
engineer who prepared the report (a modest fee may be required) and/or to
conduct additional study to obtain the specific types of information they
need or prefer. A prebid conference can also be valuable. Be sure contrac-
tors have sufficient time to perform additional study. Only then might you
be in a position to give contractors the best information available to you,
while requiring them to at least share some of the financial responsibilities
stemming from unanticipated conditions.
Read RIISIIOIIIdItY Pravlslons Closely
Some clients, design professionals, and contractors do not recognize thai
geotechnical engineering is far less exact than other engineering disci-
plines. This lack of understanding has created unrealistic expectations that
have led 10 disappoinlments, claims, and disputes. To help reduce the risk
of such outcomes, geotechnical engineers commonly include a variety of
explanatory provisions in their reports. Sometimes labeled 'limitations'
many of these provisions indicate where geotechnical engineers' responSi-
bilities begin and end, to help others recognize their own responsibilities
and risks. Read these provisions closely. Ask Questions. Your geotechnical
engineer should respond fully and frankly.
Geoenvironllllntal Coacerns Are Not Covered
The equipment, techniques, and personnel used to pertorm a geoenviron-
mental study differ significantly from those used to pertorm a geotechnical
study. For that reason, a geotechnical engineering report does not usually
relate any geoenvironmental findings, conclusions, or recommendations;
e.g., about the likelihood of encountering underground storage tanks or
regulated contaminants. Unanticipated environmerrtal problems have led
to numerous project failures. If you have not yet obtained your own geoen-
vironmental information. ask your geotechnical consuHanl for risk man-
agement guidance. Do not rely on an environmental report prepared (or
someone else.
Obtain ProfassloRal Assistance To Ileal with Mold
Diverse strategies can be applied during building design, construction.
operation, and maintenance to prevent significant amounts of mold from
growing on indoor surtacas. To be effective. ali such strategies Should be
devised for the express purpose of mold prevention, integrated into a com-
prehensive plan, and executed with diligent oversight by a professional
mold prevention consultant. Because just a small amount of water or
moisture can lead to the development of severe mold infestations, a num-
ber of mold prevention strategies focus on keeping building surtaces dry.
While groundwater, water infiltration. and similar issues may have been
addressed as part of the geotechnical engineering study whose findings
are conveyed irrlhis report, the geotechnical engineer in charge of this
project is not a mold prevention consultant none of the rervicer per-
formed In connecllon with the gllOtllehnlul engin"r" sludy
WI/Ill designed or eondueted for the purpose of mold preven·
Yon. Prop,r Implementlltlon of the m:omment/ations CDnveyeil
in this IlIport will not of IIstJU be sufflclenl to pllIvent mold from
growing In or on th' strucfllre Involved.
Rely, III YIII' A8fE-MB1IIIer GIDbIcIInI:III
. EngIneer , ... AdIIIIIIIII AnIIIInI:e
Membership in ASFF!fhe Best People on Earth exposes geotechnical
engineers to a wide array of risk management techniques that can be of
genuine benefit for everyone involved with a construction project. Confer
with you ASFE-mernber geotechnical engineer for more information.
ASFE
IU ......... 1 II Urlll
8811 COlesville Road/SUite G106. Silver Spring, MD 20910
Telephone: 301/565-2733 Facsimile: 301/589-2017
e-mail: info@asfe.org www.asfe.org
CopyrtglJl 2D04 by ASfE, Inc. Dup/Il:dtIon. reproduction. or copying ol1lJls doou"""t. In whole or In fJ8rt, by ,ny ... ,ns wllatsoeVll" is stricl1y pro_, exJ:8f1/ wiIIr ASFE's
spt<ilic wrimln pormissirm. fX£ftpUng, quo!illg. or IlIheIWisB extI>cIIrJg worrIing /rom /his doc1Jmsn' Is permll18cl only wUh the..",.., written perm;s.ion of ASFE. IItId only IrK
purposes of schollrly research or tJook 1f1View. Only members of ASFf f1IIY use this documBrIt as II comp/Bment to or as an elemtmt of a lJ«)tBchnlcaJ eng/flBfrilfg report Any other
firm, IndMdual, or other entity that so uses this C10Cument without bflno an ASFE rneml1Br coukIlJ8 committing nfl(lllgent or intentional (fnJUdul8nt) misrepressntatJcm.
lIGERlI6045.0M
September 10, 2013
ES-2972
Conner Homes Group, LLC
c/o WestPac Development
7449 West Mercer Way
Mercer Island, Washington
Attention: Mr. Peter O'Kane
Dear Mr. O'Kane:
• Earth Solutions NW LLC
• Ceotechnicdl Engineering
• Construction Monitoring
• Environn1entdl Sciences
Earth Solutions NW, LLC (ESNW) is pleased to present this report titled "Geotechnical
Engineering Study, Proposed Rosa Plat, 2724 Benson Road South, Renton, Washington".
Based on the results of the geotechnical investigation, the proposed residential development is
feasible from a geotechnical standpoint. The soil underlying the site consists predominantly of
native weathered and unweathered glacial till deposits. The proposed residential structures
can be supported on conventional foundations bearing on competent native soils generally
encountered at depths of one to two feet below eXisting grade or structural fill placed as part of
the site grading activities. Recommendations for foundation design, earthwork, and other
pertinent geotechnical recommendations are provided in this report. A site plan was not
available at the time of this report.
If you have any questions regarding the content of this geotechnical engineering study, please
contact us.
Sincerely,
EARTH SOLUTIONS NW, LLC
:Y1A.~0
Watson, E.I.~
ineer
1805 -136th Place N.E., Suite 201 • Bellevue, WA 98005 • (425) 449-4704 • FAX (425) 449-4711
TABLE OF CONTENTS
ES·2972
INTRODUCTION ........................................................................ 1
General.................................................................... ...... 1
Project Description.................................. ......................... 1
Surface............ ................................................................ 1
Subsurface................... ......... ........................................... 2
Geologic Setting....................................................... 2
Groundwater...................................... ..................... ........... 2
DISCUSSION AND RECOMMENDATIONS....................................... 2
General.. ........................................................................... 2
Site Preparation and Earthwork.......................... ............ ...... 3
Temporary Erosion Control....................................... 3
In-situ Soils... ... ... ............ ... ...................................... 3
Structural Fill Placement...... .................. ................... 3
Subgrade Preparation.......... ..................... ................ 4
Foundations.................. ...... ........................ .......... ........... 4
Slab·on-Grade Floors...... ... ... ............... .............................. 5
Seismic Considerations.......... ...... ......... ................................ 5
Excavations and Slopes.................................................... 6
Utilitv Trench Backfill...... ................................................... 6
Drainage ........................................................................... 6
Retaining Wall .................................................................. 7
Pavement Sections... ......... ...... ... ......... ...... ...... ............ ... ... 7
LIMITATIONS ...... '" .......................... , ............ ... ......... ... ......... ...... 8
Additional Services............... ......... ................. .... ............... 8
Earth Solutions torW. LLC
GRAPHICS
Plate 1
Plate 2
Plate 3
APPENDICES
Appendix A
Appendix B
TABLE OF CONTENTS
Cont'd
ES-2972
Vicinity Map
Test Pit Location Plan
Typical Footing Drain Detail
Subsurface Exploration
Test Pit Logs
Laboratory Test Results
Grain Size Distribution
Earth Solutions NW, LLC
GEOTECHNICAL ENGINEERING STUDY
PROPOSED ROSA PLAT
2724 BENSON ROAD SOUTH
RENTON, WASHINGTON
ES-2972
INTRODUCTION
This geotechnical engineering study was prepared for the proposed residential development to
be constructed off of Benson Road South Renton, Washington. The approximate location of
the subject property is illustrated on the Vicinity Map (Plate 1). The purpose of this study was to
develop geotechnical recommendations for the proposed project. The scope of services for
completing this geotechnical engineering study included the following:
• Subsurface exploration consisting of observing, logging and sampling four test pits
excavated within accessible areas of the development envelope;
• Engineering analysis; and,
• Preparation of this report.
Project Description
The subject site is located southeast of the intersection Benson Road South and South 2ih
Street in Renton, Washington. The subject site consists of four adjoining tax parcels totaling
approximately 4.2 acres. Existing structures onsite include two houses. A cursory review of an
available geologic map indicates the site is underlain by Vashon subglacial till (Qvt).
We understand the existing structures will be removed and the site will be redeveloped into
residential lots, access roads, and associated utility improvements
The existing vegetation consists of tree cover concentrated near the northwest corner of the site
and a large grass field for the remainder of the site. Site topography descends northwest at a
moderate slope, with approximately forty feet of elevation change across the site. The
topography surrounding the two existing single-family structures suggest fills of up to four feet
were placed during construction of the buildings.
Earth Solutions NW, LLC
Conner Homes Group, LLC
clo WestPac Development
September 10, 2013
Subsurface
ES-2972
Page 2
An ESNW representative observed, logged and sampled four test pits excavated at the site for
purposes of assessing soil and groundwater conditions. The approximate locations of the test
pits are illustrated on the Test Pit Location Plan (Plate 2). Please refer to the test pit logs
provided in Appendix A for a more detailed description of the subsurface conditions.
Topsoil was encountered to depths of approximately six inches. Fill was encountered at test pit
location TP-4 to a depth of about one foot below existing grade. Chunks of old concrete
foundation were also observed in fill areas at TP-4. Fill consisted primarily of medium dense
silty sand with varying amounts of gravel (Unified Soil Classification SM).
Native soils underlying the topsoil and fill were comprised primarily of dense to very dense silty
sand with gravel (SM) associated with weathered and unweathered glacial deposits. Soil
relative density generally increased with depth. In general, dense conditions were encountered
at depths up to three and one-half feet below existing grades.
Geologic Setting
The geologic map of the area identifies glacial till (Qvt) deposits throughout the site and
surrounding area. Based on the results of the subsurface investigation, the soils observed at
the test sites are generally consistent with the glacial till.
Groundwater
No seepage was observed at test pit locations (August 2013). However, groundwater seepage
should be expected in site excavations, given the observed soil conditions. Groundwater
seepage rates and elevations fluctuate depending on many factors, including precipitation
duration and intensity, the time of year, and soil conditions.
DISCUSSION AND RECOMMENDATIONS
Based on the results of our study, the residential development on the subject site is feasible
from a geotechnical standpoint. The proposed residential structures can be supported on
competent native soil generally encountered at depth of one to two feet below existing grades
or on structural fill placed as part of the site grading activities. Where fill areas are proposed,
compaction of the existing fill soils to structural fill specifications described later in this study will
be necessary.
This study has been prepared for the exclusive use of Conner Homes Group, LLC, and their
representatives. No warranty, expressed or implied, is made. This study has been prepared in
a manner consistent with the level of care and skill ordinarily exercised by other members of the
profession currently practicing under similar conditions in this area.
Earth Solutions NW. LLC
Conner Homes Group, LLC
clo West Pac Development
September 10, 2013
Site Preparation and Earthwork
ES-2972
Page 3
Site preparation activities will likely include removing the existing structure and associated
improvements from the development envelope, establishing clearing limits and installing
temporary erosion control measures.
The primary geotechnical considerations during the proposed site preparation and earthwork
activities will involve the overall cut and fill activities, structural fill placement and compaction,
underground utility installations, and final building and pavement area subgrade preparation.
We anticipate the mass grading will utilize a balanced approach, with cut soils used as
structural fill elsewhere on-site.
I Temporary Erosion Control
Temporary erosion control measures should include, at a minimum, silt fencing placed along
the downslope perimeter of the construction envelope, and a construction entrance consisting
of quarry spalls to minimize off-site soil tracking and to provide a firm surface. Surface water
must not be allowed to flow over, or collect above, temporary or permanent slopes. Interceptor
drains or swales should be considered for controlling surface water flow patterns. ESNW should
observe the erosion control measures, and provide supplement recommendations for
minimizing erosion during construction.
In-situ Soils
From a geotechnical standpoint, the silty sand deposits encountered at the test pit locations are
generally suitable for use as structural fill provided the soil moisture content at the time of
grading allows compaction to the levels specified below. The moisture sensitivity of the silty
sand deposits antiCipated to be exposed during grading activities can generally be
characterized as moderate to high. Due to the moisture sensitive nature of the silty sand soil,
successful use of the soil will largely be dictated by the moisture content at the time of
placement and compaction.
If the on-site soils cannot be successfully compacted, the use of an imported soil may be
necessary. Imported soil intended for use as structural fill should consist of a well graded
granular soil with a maximum aggregate grain size of six inches, and a moisture content that is
at or near the optimum level. During wet weather conditions, imported soil intended for use as
structural fill should consist of a well graded granular soil with a fines content of 5 percent or
less defined as the percent passing the #200 sieve, based on the minus three-quarter inch
fraction.
Structural Fill Placement
In general, areas to receive structural fill should be sufficiently stripped of organic matter and
other deleterious material. Overstripping of the site and proposed fill surfaces should be
avoided. ESNW should observe cleared and stripped areas of the site prior to structural fill
placement.
Earth Solutions NW. LLC
Conner Homes Group, LLC
c/o WestPac Development
September 10, 2013
ES-2972
Page 4
Structural fill is defined as compacted soil placed in foundation, slab-on-grade, and onsite
roadway areas. Fills placed to construct permanent slopes and throughout rockery, retaining
wall, and utility trench backfill areas are also considered structural fill. Soils placed in structural
areas should be placed in maximum 12 inch lifts and compacted to a relative compaction of 90
percent, based on the maximum dry density as determined by the Modified Proctor Method
(ASTM 0-1557-02). In pavement areas, the upper 12 inches of the structural fill should be
compacted to a relative compaction of at least 95 percent. City, county, or other jurisdiction
compaction requirements may supercede the above recommendations in right-of-way areas.
Subgrade Preparation
Following site stripping and removal of the existing structural improvements, cuts and fills will
be completed to establish the proposed subgrade levels throughout the site. Existing fill placed
during the construction of the existing structures may need to be compacted to the
requirements of structural fill, depending on field conditions. ESNW should observe the
subgrade during the initial site preparation activities to confirm soil conditions and to provide
supplemental recommendations for subgrade preparation, if necessary. The process of
removing the existing building structure may produce voids where the old foundations are
removed, and where basement or crawl space areas may have been present. Thorough
restoration of voids from old foundation and basement areas must be completed as part of the
overall subgrade and building pad preparation activities. The following guidelines for preparing
the building subgrade areas should be incorporated into the final design:
• Where voids and related demolition disturbances extend below the planned subgrade
level, restoration of these areas should be completed. Structural fill should be used to
restore voids or unstable areas resulting from the existing building removal.
• Re-compact or overexcavate and replace areas of existing fill (if present) exposed at the
building subgrade elevation. ESNW should confirm subgrade conditions and the
required level of re-compaction or overexcavation and replacement during the site
preparation activities. Overexcavations should extend to competent (medium dense)
native soils and replaced with structural fill.
• ESNW should confirm overall suitability of the prepared subgrade areas following the site
work activities.
Foundations
The proposed residential structures can be supported on conventional spread and continuous
footings bearing on competent native soil or structural fill. We antiCipate competent native soil
suitable for support of foundations will generally be encountered at depths of one to two feet
below existing grades. Building pad fill areas should be compacted to the specifications of
structural fill previously described in this report. Where loose or unsuitable soil conditions are
encountered at foundation subgrade elevations, compaction of the soils to the specifications of
structural fill, or overexcavation and replacement with structural fill may be necessary.
Earth Solutions NW. llC
Conner Homes Group, LLC
c/o WestPac Development
September 10, 2013
For design the following parameters can be used for the foundation design:
• Allowable soil bearing capacity
• Passive earth pressure
• Coefficient of friction
2,500 psf
350 pcf
OAO
ES-2972
Page 5
The passive earth pressure value provided above assumes the foundations are backfilled with
structural fill, A factor-of-safety of 1,5 has been applied to these passive resistance and friction
values,
For short term wind and seismic loading, a one-third increase in the allowable soil bearing
capacity can be assumed,
With structural loading as expected, total settlement in the range of one inch is anticipated, with
differential settlement of approximately one-half of an inch, The majority of the settlements
should occur during construction, as dead loads are applied,
Slab-an-Grade Floors
Slab-on-grade floors for residential structures should be supported on competent native soil or
structural fill, Unstable or yielding areas of the subgrade should be recompacted or
overexcavated and replaced with suitable structural fill prior to construction of the slab. A
capillary break consisting of a minimum of four inches of free draining crushed rock or gravel
should be placed below the slab, The free draining material should have a fines content of 5
percent or less (percent passing the #200 sieve, based on the minus three-quarter inch
fraction), In areas where slab moisture is undesirable, installation of a vapor barrier below the
slab should be considered. If a vapor barrier is used it should consist of a material specifically
designed for that use and be installed in accordance with the manufacturer's specifications.
Seismic Considerations
The 2009 International Building Code speCifies several soil profiles that are used as a basis for
seismic design of structures, If the project will be permitted using the 2009 IBC, based on the
soil conditions observed at the test sites, Site Class D, from table 1613.5,2, should be used for
design.
The 2012 IBC recognizes ASCE for seismic site class definitions. If the project will be permitted
under the 2012 IBC, in accordance with Table 20.3-1 of ASCE, Minimum Design Loads for
Buildings and Other Structures, Site Class D, should be used for design.
In our opinion, liquefaction susceptibility at this site is low, The relative density of the site soils
and the absence of a uniform, shallow groundwater table is the primary basis for this
designation.
Earth Solutions tolIN, LLC
Conner Homes Group, LLC
c/o WestPac Development
September 10, 2013
Excavations and Slopes
ES-2972
Page 6
The Federal and state Occupation Safety and Health Administration (OSHAIWISHA) classifies
soils in terms of minimum safe slope inclinations. Based on the soil conditions encountered
during our fieldwork, fill, weathered native soil and where groundwater is exposed would be
classified by OSHAIWISHA as Type C. Temporary slopes over four feet in height in Type C
soils should be sloped no steeper than 1,5H:1V (Horizontal:Vertical), Dense glacial till soils
would be classified by OSHAIWISHA as Type A. Temporary slopes over four feet in height in
Type A soils should be sloped no steeper than 0,75H:1V (Horizontal:Vertical), Temporary
slopes steeper than the OSHAIWISHA guidelines detailed above may be acceptable depending
on the actual conditions exposed during grading activities,
ESNW should observe temporary and permanent slopes to confirm that the inclination is
appropriate for the soil type exposed, and to provide additional grading recommendations, as
necessary. If temporary slopes cannot be constructed in accordance with OSHAIWISHA
guidelines, temporary shoring may be necessary.
Permanent slopes should maintain a gradient of 2H:1V, or flatter, and should be planted with an
appropriate species of vegetation to enhance stability and to minimize erosion.
Utility Support and Trench Backfill
In our opinion, the soils observed at the test pit locations are generally suitable for support of
utilities. Excessively loose, organic, or otherwise unsuitable soils encountered in the trench
excavations should not be used for supporting utilities. In general, the on-site soils observed at
the test pit locations should be suitable for use as structural backfill in the utility trench
excavations, provided the soil is at or near the optimum moisture content at the time of
placement and compaction, Moisture conditioning of the soils may be necessary at some
locations prior to use as structural fill. Utility trench backfill should be placed and compacted to
the specifications of structural fill provided in this report, or to the applicable specifications of the
County or other applicable jurisdiction or agency.
Drainage
Groundwater seepage was not encountered at the time of our fieldwork (August 2013).
However, the presence of perched groundwater seepage should be anticipated during site
excavations, particularly in the late fall, winter, spring and early summer months. Temporary
measures to control groundwater seepage and surface water runoff during construction will
likely involve interceptor trenches and sumps, as necessary, In our opinion, the proposed
reSidential structures should incorporate footing drains around the outside perimeter of the
foundations. A typical footing drain detail is provided on Plate 3 of this report. Surface grades
adjacent to structures should slope away from the structures at a gradient of at least 2 percent.
Earth Solutions I'IW, LLC
Conner Homes Group, LLC
clo WestPac Development
September 10, 2013
Retaining Walls
ES-2972
Page 7
Retaining walls should be designed to resist earth pressures and applicable surcharge loads.
The following parameters can be used for preliminary retaining wall design:
• Active earth pressure (yielding condition) 35 pet (equivalent fluid)
• At-rest earth pressure (restrained condition) 55 pcf
• Traffic surcharge (passenger vehicles) 70 psf (rectangular distribution)
• Passive pressure 250 pcf (equivalent fluid)
• Coefficient of friction 0.40
• Seismic surcharge 6H* (yielding condition)
14H* (restrained condition)
'Where H equals the retained height
Additional surcharge loading from foundations, sloped backfill, or other loading should be
included in the retaining wall design. Drainage should be provided behind retaining walls such
that hydrostatic pressures do not develop. If drainage is not provided, hydrostatic pressures
should be included in the wall deSign. ESNW should review any retaining wall designs to verify
that appropriate earth pressure values have been incorporated into design and to provide
additional recommendations.
Retaining walls should be backfilled with free draining material that extends along the height of
the wall, and a distance of at least 18 inches behind the wall. The upper one foot of the wall
backfill can consist of a less permeable (surface seal) soil, if desired. A rigid, perforated drain
pipe should be placed along the base of the wall, and connected to an approved discharge
location.
Pavement Sections
The performance of site pavements is largely related to the condition of the underlying
subgrade. To ensure adequate pavement performance, the subgrade should be in a firm and
unyielding condition when subjected to proofrolling with a loaded dump truck. Structural fill in
pavement areas should be compacted to the specifications previously detailed in this report. It
is possible that soft, wet, or otherwise unsuitable subgrade areas may still exist after base
grading activities. Areas containing unsuitable or yielding subgrade conditions will require
remedial measures such as overexcavation and thicker crushed rock or structural fill sections
prior to pavement.
For lightly loaded pavement areas subjected primarily to passenger vehicles, the following
preliminary pavement sections can be considered:
Earth Solutions ~. LLC
Conner Homes Group, LLC
c/o West Pac Development
September 10, 2013
ES-2972
Page 8
• Two inches of hot mix asphalt (HMA) placed over four inches of crushed rock base
(CRB), or;
• Two inches of HMA placed over three inches of asphalt treated base (ATB).
For relatively high volume, heavily loaded pavements subjected to occasional truck traffic, the
following preliminary pavement sections can be considered:
• Three inches of HMA placed over six inches of CRB, or;
• Three inches of HMA placed over four inches of ATB.
The HMA, ATB and CRB materials should conform to WSDOT specifications. All soil base
material should be compacted to at least 95 percent of the maximum dry density. Final
pavement design recommendations can be provided once final traffic loading has been
determined. City of Renton road standards may supersede the recommendations provided in
this report.
LIMITATIONS
The recommendations and conclusions provided in this geotechnical engineering study are
professional opinions consistent with the level of care and skill that is typical of other members
in the profession currently practicing under similar conditions in this area. A warranty is not
expressed or implied. Variations in the soil and groundwater conditions observed at the test
sites may exist, and may not become evident until construction. ESNW should reevaluate the
conclusions in this geotechnical engineering study if variations are encountered.
Additional Services
ESNW should have an opportunity to review the final deSign with respect to the geotechnical
recommendations provided in this report. ESNW should also be retained to provide testing and
consultation services during construction.
Earth Solutions NW, LLC
Reference:
King County, Washington
Map 656
By The Thomas Guide
Rand McNally
32nd Edition
tions NWLLe
Construction Monitoring
~ I SCiences
Vicinity Map ~'~ .
Rosa Property
Renton, Washington
NOTE This plate may contain areas of color ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black & white reproductions of this plate.
Drwn. GLS
Checked SCW
Proj. No. 2972
Plate
~ - -s:,~,~,~ -1--,---;---
" -iTP-1
LEGEND
TP-1-i-Approximate Location of
I ESNW Test Pit, Proj. No.
ES-2972, Aug. 2013
---1 I I Subject Site
1 __ -
4 Proposed Lot Number
NOTE: The graphics shown on this plale are not intended for design
purposes or precise scale measurements, but only to illustrate the
approximate test locations relative 10 the approximate locations of
existing and I or proposed site features. The information illustrated
is largely based on dala provided by the client at Ihe time of our
study. ESNW cannol be responsible for subsequent design changes
or inlerpretation of the data by others.
NOTE: This plate may contain areas of color. ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black & white reproductions of this plale.
•
'4
15
16
S. 28TII S I.
I !1 \
-----\ .JL 12 \
'I TP-3 \
--------.!--'------..I.
NORTH
~j
Not -To -Scale
Solutions NWLU
nkal Englneenng ConstrUCtion MOil LO Il~
and Environmental SCiences
Test Pit Location Plan
Rosa Property
Renton, Washington
Drwn. GLS Date 08/29/2013 Proj. No. 2972
Checked SCW Date Aug. 2013 Plate 2
Slope ---..
2" (Min.)
Perforated Rigid Drain Pipe
(Surround with 1" Rock)
NOTES:
• Do NOT tie roof downspouts
to Footing Drain.
• Surface Seal to consist of
12" of less permeable, suitable
soil. Slope away from building.
LEGEND:
1<':-:-: <I Surface Seal; native soil or
:::::::::: other low permeability material.
1" Drain Rock
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAWING
• h Solutions NWlU
meal Englneenng ConstrUCtlorl MOil Will'S
t and EnVironmental SClcncc~
I Drwn. GLS
FOOTING DRAIN DETAIL
Rosa Property
Renton, Washington
Date 09/10/2013 Proj. No. 2972
Checked SCW Date Sept. 2013 Plate 3
Appendix A
Subsurface Exploration
ES-2972
The subsurface conditions at the site were explored by excavating four test pits at the
approximate locations illustrated on Plate 2 of this report. The test pit logs are provided in this
Appendix. The subsurface exploration was completed in August 28, 2013. The final logs
represent the interpretations of the field logs and the results of laboratory analyses. The
stratification lines on the logs represent the approximate boundaries between soil types. In
actuality, the transitions may be more gradual.
Earth Solutions NW. LLC
Earth Solutions NWLLC
SOIL CLASSIFICATION CHART
MAJOR DIVISIONS TYPICAL
DESCRIPTIONS
CLEAN
GRAVEL GRAVELS
AND
GRAVELLY
SOILS (LITTlE OR NO ANES)
COARSE
GRAINED GRAVELS WITH
SOILS MORE TlWI50% FINES OF COARSE
FRACTION
RETAINED ON NO.
4 SIEVE (APPRECIABLE
AMOUNT OF FINES)
CLEAN SANDS
MORE THAN 50% SAND
OF MATERIAL IS AND
LARGER THAN SANDY
NO. 200 SIEVE SOILS SIZE (LITTlE OR NO FINES)
SANDS WITH
MORE THAN 50% FINES OF COARSE
FRACTION
PASSING ON NO.
4 SIEVE (APPRECIABLE
AMOUNT OF AHES)
SILTS UOUIDUMIT FINE AND
GRAINED CLAYS LESS THAN 50
SOILS
MORE THAN 50%
OF MATERIAL IS
SMAUERTHAN
NO. 200 SIEVE
SIZE SILTS
AND LlQUlDUMIT
CLAYS GREATER THAN 50
HIGHLY ORGANIC SOILS
GP
SP
OH
PT
WEll-GRADED GRAVELS, GRAVEL-
SAND MIXTURES, UTILE OR NO
FINES
POORLY-GRADED GRAVELS,
GRAVEL -SAND MIXTURES, UTILE
OR NO FINES
SIL TV GRAVELS. GRAVEL -SAND -
SILT MIXTURES
CLAYEY GRAVELS. GRAVEL -SAND.
CLAY MIXTURES
WELL-GRADED SANDS, GRAVELLY
SANDS, LITTlE OR NO ANES
POORLY-GRADED SANDS.
GRAVEllY SAND. LITTlE OR NO
FINES
SIL TV SANDS. SAND -SILT
MIXTURES
CLAYEY SANDS, SAND -CLAY
MIXTURES
INORGANIC SILTS. MICACEOUS OR
DIATOMACEOUS FINE SAND OR
SILTVS04LS
INORGANIC CLAYS OF HIGH
PLAsnclTY
ORGANIC CLAYS OF MEDIUM TO
HIGH PLASTICITY. ORGANIC SILTS
PEAT. HUMUS, SWAMP SOILS WITH
HIGH ORGANIC CONTENTS
DUAL SYMBOLS are used to indicate borderline soil claSSifications.
The diSCUSSion in the text of this report is necessary for a proper understanding of the nature
of the material presented in the attached logs.
• Earth Solutions NW TEST PIT NUMBER TP-1
1805 136th Place N.E., Suite 201 PAGE 1 OF 1
Bellevue, Washington 98005
Telephone: 425-284-3300
CLIENT Conner Homes Grou~ PROJECT NAME Rosa Pro~e!1ll
PROJECT NUMBER 2972 PROJECT LOCATION Renton Washington
DATE STARTED 8128/13 ____ COMPLETED 8/28113 GROUND ELEVATION 4351\ TEST PIT SIZE
--~-.--
EXCAVATION CONTRACTOR NW Excavating GROUND WATER LEVELS:
EXCAVATION METHOD AT TIME OF EXCAVATION ~
---------~---~-----.---~-~ ---------.
LOGGED BY ~---CHECKED BY sew AT END OF EXCAVATION ----
NOTES De~th of TQI1soil & Sod 6": forest duff AFTER EXCAVATION -
w
0.. 0 :I: ~ffi .; ~8 fuE will TESTS <..i MATERIAL DESCRIPTION --l:;; .; ~--l " 0.." ;;;j :;;z c.? c,;
0
TPSL" 0.' TOPSOil. scattered roots .4~~
Tan sitty SAND with gravel, medium dense, damp
MC=6.30%
SM -partially cemenled
f--3 .• 432.0
Gray silty SAND wilh gravel, dense. moist
MC=9.40%
-becomes very dense
r--L
SM -scattered cobble.
MC=8.80%
8.' 426.5
Test p~ terminated at 8.5 feet below existing grade. No groundwater encOuntered during
excavation.
Bottom of test pit at 8.5 feet.
• Earth Solutions NW TEST PIT NUMBER TP-2
1805 136th Place N.E., Suite 201 PAGE 1 OF 1
Bellevue, Washington 98005
Telephone: 425-284-3300
CLIENT Conner Homes GroJ!P ___ PROJECT NAME Rosa Prope~ ---._-
PROJECT NUMBE~_.2_9.?2 PROJECT LOCATION. Remon Wa~ton
DATE STARTED 8/28113 COMPLETED 8/28113 GROUND ELEVATION ~-TEST PIT SIZE ------"-
EXCAVATION CONTRACTOR NW Excavating GROUND WATER LEVELS:
EXCAVATION METHOD ----------,--AT TIME OF EXCAVATION -----_. ._--
LOGGED BY SCW CHECKED BY SCW AT END OF EXCAVATION ---
NOTES ~lhofTopsoU&Sod6"~. .-AFTER EXCAVATION --
w n. t)
~g ~ffi <Ii ~8 w m TESTS <.i MATERIAL DESCRIPTION ..... :; (I) ~ ..... n." 0 !Z " C)
0
TPSL '-' 0.' TOPSOIL, scattered roots 452.5
Brown silty SAND with gravel, medium dense, damp
SM -becomes dense
MC=7.20%
r---3 .• -----450.0
Gray silly SAND with gravel, dense, moist
-scattered cobbles
-...L..
SM
Me= 10.40% •. 0 445.0
Test pit terrnina1ed at 8.0 feet below existing grade. No groundwater encountered during
excavation.
Bottom of test pit at 8.0 feet.
0
~
~
I
~
I
~
~
I w
•
Earth Solutions NW
180S 136th Place NE, Suite 201
Bellevue, Washington 9800S
Telephone: 42S-284-3300
CUENT Conner Homes Group
PROJECT NUMBER 2972
TEST PIT NUMBER TP-3
PAGE 1 OF 1
PROJECT NAME Rosa ~. ____________ _
PROJECT LOCATION Renton, Washington
DATE STARTED 8128113 _ _ COMPLETED -,8",12.,8 ... 11",3,-__ GROUND ELEVATION ...:4",Scc1 ... ft __ _ TEST PIT SIZE _____ _
EXCAVATIONCONTRACTOR-,N~W~~~a~v~a~ti~ngL-_______ _ GROUND WATER LEVELS:
EXCAVAnON METHOD . ______ . __ AT TIME OF EXCAVAnON . -____ . ___ . __ ... __
LOGGED BY -'S"'C!!W"--___ _ CHECKED BY -'S"'C"'W"-__ _ AT END OF EXCAVATION -='-__________ _
NOTES Depth of Topsoil & Sod 6": thick grass AFTER EXCAVATION
W
Do-0 :r ~ffi <Ii
t:i1? will U IC)
TESTS "'-0 w-~:::; <Ii ~-' 0 t~ ::i C)
MATERIAL DESCRIPTION
0
TPSL '--' '0.5 TOPSOIL, roots 450.5
8M
MC: 12.10% ---
SM
MC:9.20%
Brown silty SANO with gravel, medium dense, damp
3.0 -becomes moist
Gray silty SA~NC"D-wit-,.c-h-gra-ve--C-I,-'de-ns-e,-m-ot-'.s-'t---------------"'''''''''''I.0
-partially cemented
-scattered oobble.
-becomes very dense
7.5 443.5
Test p~ terminated at 7.5 feet below existing grade. No groundwater enoountered during
excavation.
Bottom of test pit at 7.5 feet.
IL-__ L-__ ~ ____________ ~ __ L-__ L-_______________________________________________________ ~
• Earth Solutions NW TEST PIT NUMBER TP-4
1805 136th Place N.E.. Su~e 201 PAGE 1 OF 1
Bellevue, Washington 98005
Telephone: 425-284-3300
CLIENT Conner Homes GTOU~ PROJECT NAME Rosa Proll!!!!Y
PROJECT NUMBER 2972 Pl!0_~ECT LOCATION Renton. Washington .-= .-
DATE STARTED 8/28/13 ___ COMPLETED 8128113 GROUND ELEVATION 450 ft TEST PIT SIZE -----
EXCAVATION CONTRACTOR NW EXC!lyatlng .. _. GROUND WATER LEVELS:
EXCAVATION METHOD AT TIME OF EXCAVATION ---------~--.. _--"._-_ .. ._----_ .. _-
LOGGED BY scw CHECKED BY SCW AT END OF EXCAVATION -
NOTES De~th of Toosoll & Sod 6": grass AFTER EXCAVATION
w
J: ~ffi oj ()
:I:(!) !i;g w m TESTS (j 0.0 MATERIAL DESCRIPTION ->::< oj ~-> 0 0.:::. ::i ~z (!)
(J)
0
SM
(Conaete obstruction -moyeO axcavallon 3' west)
Brown silty SAND. medium dense. moist (Fill). concrete chunks
1.0 ..... 0
Brown silty SAND with gravel. medium dense. moist
MC~8.80% SM
1-3 .• 447.0
Graysilty SAND with gravel. dense, moist
Me = 11.80% -partially cemented
r--L SM -scattered cobbles
-becomes very dense
MC = 10.50% 7.5 442.5
Test pllterminated at 7.5 feet below existing grade. No groundwater encountered during
excavation.
Bottom of te.t pH at 7.5 feet.
AppendixB
Laboratory Test Results
ES-2972
Earth Solutions /NIl, LLC
• Ea~h Solutions NW GRAIN SIZE DISTRIBUTION
, . t • 1805 -136th Place N.E., Suite 201
SeHevue, WA 98005
Telephone: 42S-284-3300
CLIENT Conner Homes Grou~ LlC PROJ!;CT NAM!; Rosa
PROJ!;CT NUMB!;R ES-2972 PROJECT LOCA nON Renton
u.s. SIEVE OPENING iN INCHES I U.S. SIEVE NUMBERS I HYDROMETER
6 4 , 2 15 1 1123IB 3 4 6 8101416 20 ao 40 50 60 100140200
100 K "-tl I I I I I I
95 ~ I"-
90
85 ~
80 ~ :r.
75
70 ~
I-65 l~ I
~ 60 I~ f\ ~
~ 55 ~ 0: UJ 50 1\ \ z
ii:
!z 45 '\ UJ
!;! 40
UJ
II.
35
30
25
20
15
10
5
0
100 10 1 0.1 0.01 0.001
GRAIN SIZE IN MILLIMETERS
I COBBLES I GRAVEL I SAND I SILT OR CLAY coarse fine I coarse I medium I flne 1
Specimen Identification Classification LL PL PI Cc Cu
0 TP-1 2,Oft. USDA: Brown Sandy Loam. uses: SM,
I2l TP-3 3.Oft, USDA: Brown Loam. uses: SM.
Ie, TP4 7.Sft. USDA: Brown Gravelly Sandy Loam. uses: SM.
Specimen Identification D100 060 030 D10 %Silt %Clay
.0 TP-1 2.Oft. 19 0.194 44.0
I2l TP-3 3.0ft_ 19 0,212 44.9
Ie, TP4 7.SfiL 37.5 0,278 36.9
EMAIL ONLY
Distribution
ES-2972
Conner Homes Group, LLC
clo WestPac Development
7449 West Mercer Way
Mercer Island, Washington 98040
Attention: Mr. Peter O'Kane
Earth SolUtions torW, LLC
September 24, 2013
ES-2972.02
Conner Homes Group
846 - 1 08th Ave Northeast, Suite 205
Bellevue, Washington 98005
Attention: Mr. Kyle Kittelman
Subject: Preliminary Coal Mine Hazard Evaluation
Proposed Residential Development
2724 Benson Road South
Renton, Washington
Reference: Earth Solutions NW, LLC
Geotechnical Engineering Study
ES-2972, dated September 10, 2013
Dear Mr. Kittelman:
Earth Solutions NW LLC
• Geotechnicdl Engineering
• Construction Monitoring
• I::nvironmental Sciences
In accordance with your request, Earth Solutions NW, LLD (ESNW) has prepared this letter
providing a summary of our preliminary coalmine hazard evaluation for the subject property.
Records Review
The subject property is located along the east side of Benson Road South in Renton,
Washington. This general area has been identified as a potential coal mine hazard area due to
historic mining records. We reviewed maps K32a through K32e of the King County Coal Mine
Maps inventory. Based on review, it appears that the Benson Mine was located north of the
subject site about 400 feel. The majority of the mining activity appears to have been located
north of South Puget Drive and to the east of Benson Road South.
Summary and Opinion
Based on our review of readily available coal mine maps for the area, in our opinion, the subject
site is not located within a coal mine hazard area. Consistent with section 4-3-050 J1e of the
Renton Municipal Code, the site should be classified as a Low Coal Mine Hazard area.
LIMITATIONS
The recommendations and conclusions provided in this letter are professional opInions
consistent with the level of care and skill that is typical of other members in the profession
currently practicing under similar conditions in this area. A warranty is not expressed or
implied. Variations in the soil and groundwater conditions observed at the test site locations
may exist, and may not become evident until construction. ESNW should reevaluate the
conclusions in this preliminary geotechnical summary if variations are encountered.
1805 -136th Place N.E., Suile 201 • Bellevue, WA 98005 • (425) 449-4704 • FAX (425) 449-4711
Conner Homes Group
September 24,2013
ES-2792.02
Page 2
We trust this geotechnical summary meets your current needs. If you have any questions, or if
additional information is required, please call.
Sincerely,
EARTH SOLUTIONS NW, LLC
C.' ...,-c:?V ~~~r' Kyle R. Campbell, P.E.
Principal
Earth Solutions NW, LLC
APPENDIXC
Conveyance Analysis
StormShed 3G
N-D03
N-023
a
N-on N 15
19
N-02 :q,'I
N-020
N-010
On Site Conveyance System
Layout Report: Rosa
I Event IPrecip (in)
12 yr 24 hr I 2.00
110 year I 2.90
125 year I 3.40
IIOOyear I 3.90
Reach Records
Record ld: P-004
ISection Shape:
~--~~-~--,----:-----
Circular
IUniform Flow Method: I Manning's ICoefficient: I 0.012
IRouting Method: ! Travel Time Shift IContributing Hyd I !
IDnNode I N-003 iUpNode I N-004
IMaterial I unspeci fi ed ~ I 24 in Diam
lEnt Losses I Groove End w/Headwall
ILength I 93.00 ft ISlope I 0.69%
[Up Invert I 416.64ft IDn Invert I 416.00 ft
I Conduit Constraints
I Min Vel I Max Vel I Min Slope I Max Slope I Min Cover
I 2.00 fils I 15.00 ft/s I 0.50% I 2.00% I 3.00 ft
IDrop across MH I 0.00 ft IEx/Infll Rate I 0.00 inlhr
Record ld: P-005
ISection Shape: Circular
IUniform Flow Method: I Manning's ICoefficient: I 0.012
IRouting Method: I Travel Time Shift IContributing Hyd I
IDnNode I N-004 IUpNode I N-005
IMaterial I unspecified ISize I 18 in Diam
lEnt Losses I Groove End w/Headwall
ILength I 24.00 ft ISlope I 17.96%
Iup Invert I 421.45 ft IOn Invert I 417.14ft
I Conduit Constraints
I Min Vel I Max Vel I Min Slope I Ma~ Si~pe---I Min Cover
I 2.00 ft/s I 15.00 ft/s I 0.50% I 2.00% I 3.00 ft
IOrop across MH I 0.00 ft IEx/lnfil Rate I 0.00 inlhr
Record Id: P-006
ISection Shape: Circular
IUniform Flow Method:
, ICoeffi~i~t:-I I Manning's 0.012
IRouting Method: I Travel Time Shift IContributing Hyd I
IOnNode I N-004 IUpNode I N-006
IMaterial I unspecified ISize I 18 in Diam
lEnt Losses I Groove End w/Headwall
ILength I 54.00 ft ISlope I 8.44%
Iup Invert I 426.01 ft IOn Invert I 421.45 ft
I Conduit Constraints
I Min Vel I Max Vel I Min Slope T--Max Slope I Min Cover
I 2.00 fils I 15.00 ft/s I 0.50% I 2.00% I 3.00 ft
IOrop across MH I 0.00 ft IEX/lnfil Rate I 0.00 inlhr
Record Id: P-007
ISection Shape: Circular
IUniform Flow Metbod: I Manning's ICoefficient: I 0.012
IRouting Method: I Travel Time Shift IContributing Hyd I
IOnNode I N-006 IUpNode I N-007
IMaterial I unspecified ISize I 18 in Diam
lEnt Losses I Groove End wlHeadwall
ILength I 37.00 ft ISlope I 5.81%
Iup Invert I 428.16ft IOn Invert I 426.01 ft
I Conduit Constraints I
I Min Vel I Max Vel I Min Slope I Max Slope I Min Cover I
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
IDrop across MH 0.00 ft IEx/lnfil Ratc I 0.00 in/hr
Record Id: P-008
[Section Shape: Circular
IUniform Flow Method: Manning's ICoefficient: I 0.012
IRouting Method: Travel Time Shift IContributing Hyd I
IDnNode N-007 IUpNode [ N-008
[Material Closed Conduits, Concrete Pipe ISize [12 in Diam·
[Ent Losses Groove End w/Headwall
[Length 33.00 ft ISlope I 5.27%
[Up Invert 430.40 ft IDn Invert -[42S-:-66ft
--_ ... _._-------
I Conduit Constraints
I Min Vel I Max Vel I Min Slope iM------Max Slope r Min Cover
nJiOft;~I----~---
I I I 15.00 ft/s 0.50% 2.00% 3.00 ft
----
IDrop across MH [ 0.00 ft IEx/lnfil Rate I 0.00 inlhr ._----_ .. -
Record Id: P-009
[Section Shape: Circular
[Uniform Flow Method: Manning's [Coefficient: [ 0.012
IRouting Method: Travel Time Shift IContributing Hyd I
IDnNode N-008 IUpNode I N-009
[Material Closed Conduits, Concrete Pipe ISize 112 inDiam
[Ent Losses Groove End wlHeadwall
ILength 107.00 ft ISlope [ 5.16%
Iup Invert 435.92 ft IDn Invert [ 430.40 ft
I Conduit Constraints
[ Min Vel [ Max Vel I Min Slope I Max Slope I Min Cover
I 2.00 ft/s [ 15.00 ft/s I 0.50% [ 2.00% I 3.00 ft
IDrop across MH I 0.00 ft [Ex/lnfil Rate I 0.00 inlhr
Record Id: P-OIO
ISection Shape: Circular
IUniform Flow Method: I Manning's ICoefficient: I 0.012
IRouting Method: I Travel Time Shift IContributing Hyd I
IDnNode I N-009 IUpNode IN~OlO--
IMaterial I Closed Conduits, Concrete Pipe ISize 112 in Diam
lEnt Losses I Groove End w/Headwall
ILength I 131.00ft ISlope I 3.94%
Iup Invert I
--_.--
IDn Invert I 441.08 ft 435.92 ft
--§ Conduit Constraints
I Min Vel--I
---'
I I I Max Vel Min Slope Max Slope Min Cover
I 2.00 ft/s I 15.00 ft/s I 0.50% I 2.00% I 3.00 ft
IDrop across MH I 0.00 ft !Ex/Infil Rate I 0.00 inlhr
----, -~-----
Record Id: P-Oll
ISection Sha_pe: . Circular ,
rU~if~rm Flow Method: I ICoefficient: 1 0-.012 -,.-~
Manning's
IRouting Method: I Travel Time Shift IContributing Hyd I
IDnNode I N-007 IUpNode I N-Oll
IMaterial I unspecified ISize I 18 in Diam
lEnt Losses I Groove End w/Headwall
ILength I 56.00 ft ISlope I 3.23%
Iup Invert I 429.97 ft IDn Invert I 428.16 ft
I Conduit Constraints
I Min Vel I Max Vel I Min Slope I Max Slope I Min Cover
I 2.00 fils I 15.00 fils I 0.50% I 2.00% I 3.00 ft
IDrop across MH I 0.00 ft IEx/Infil Rate I 0.00 inlhr
Record Id: P-012
ISection Shape: Circular
IUniform Flow Method: Manning's ICoefficient: 0.012
IRouting Method: Travel Time Shift IContributing Hyd I---~-
IDnNode N-Oll IUpNode I N-012
IMaterial Closed Conduits, Concrete Pipe ISize 112 in Diam
lEnt Losses Groove End w/Headwall
ILength 51.00 ft ISlope I 9.24%
Iup Invert 435.18 ft IDn Invert I 430.47 ft
I Conduit Constraints
I I Min Vel I Max Vel I Min Slope I Max Slope I Min Cover
I 2.00 ft/s I 15.00 ft/s I 0.50% I 2.00% I 3.00 ft I
IDrop across MH I 0.00 ft IEx/lnfil Rate I 0.00 inlhr
Record Id: P-013
ISection Shape: ···-·----·-~--~I Circular
IUniform Flow Method: I Manning's ICoefficient: I 0.012
IRouting Method: I Travel Time Shift IContributing Hyd I
IDnNode I
fUPNode"----1----
N-012 UpNode N-013
lMaterial I Closed Conduits, Concrete Pipe ISize 112 in Diam
lEnt Losses I Groove End wlHeadwall
ILength I 25.00 ft ISlope I 0.52%
lup Invert I 435.31 ft IDn Invert I 435.18ft
I Conduit Constraints
I Min Vel I Max Vel I Min Slope I Max Slope I Min Cover
I 2.00 fils I 15.00 fils I 0.50% I 2.00% I 3.00 ft
IDrop across MH I 0.00 ft IEx/lnfil Rate I 0.00 inlhr
Record Id: P-014
ISection Shape: Circular
IUniform Flow Method: I Manning's ICoefficient: I 0.012
IRouting Method: I Travel Time Shift IContributing Hyd I
IDnNode I N-012 IUpNode I N-014
IMaterial I unspecified ISize I 12 in Diam
lEnt Losses I
. -
Groove End w/Headwall
ILength I 201.00 ft ISlope I 5.01%
Iup Invert I 445.25 ft IOn Invert I 435.18 ft
-
I Conduit Constraints
I Min Vel I Max Vel I Min Slope I Max Slope I Min Cover
I 2.00 ft/s ITs·OOft/s I 0.50% I 2.00% I 3.00 ft
IOrop across MH -r 0.00 ft IEx/lnfil Rate I 0.00 inlhr
~--""
Record Id: P-015
ISection Shape: 1----Circular
IUniform Flow Method: .1 Manning_'s ICoefficient: 0.012
IRouting Method: I Travel Time Shift IContributing Hyd r
IOnNode I
..
IUpNode I N-014 N-015
IMaterial I Closed Conduits, Concrete Pipe ISize 112 in Diam
lEnt Losses I Groove End w/Headwall
ILength I
--~-
ISlope I 23.00 ft 0.52%
Iup Invert
-~---.-"
I IOn Invert ,-445.25 ft 445.37 ft
I Conduit Constraints
I Min Vel I Max Vel I Min Slope I Max Slope I Min Cover
I 2.00 ft/s I 15.00 ft/s I 0.50% I 2.00% I 3.00 ft
IOrop across MH I 0.00 ft IExlInfil Rate I 0.00 inlhr
Record Id: P-016
ISection Shape: Circular
IUniform Flow Method: I Manning's ICoefficient: I 0.012
IRouting Method: I Travel Time Shift IContributing Hyd I
IOnNode I N-014 IUpNode I N-016
IMaterial I unspecified ISize I 12 in Diam
lEnt Losses I Groove End w/Headwall
ILength I 34.00 ft ISlope I 3.00%
Iup Invert I 446.27 ft IOn Invert I 445.25 ft
Conduit Constraints ---I
M~~5~~pe r---~M--::;,--~o::-:~c:c~.,.:op~e--:u---~I.~o~.-o~fto~el~nrih--r-
~o:oO ft-~ ---rEx/lnfil Rate
I Min Vel I Max Vel ,------,------I 2.00 fils I 15.00 ft/s
IDrop across MH
Record Id: P-017
ISection Shape: Circular
iUniform Flow Method: I Manning's 0.012
iR~~fu;.gMeth~d;--------. -I Travel Time Shift IContributing Hyd
IDnNode I N-OI6 IUpNode N-017
IMaterial I unspecified ISize I 12 in Diam
lEnt Losses 1---Groove End w/Headwall
ILength I 106.00 ft ISlope ---1-1.50%
Iup Invert I 447.86 ft IDn Invert I 446.27 ft
I Conduit Constraints I
I Min Vel I Max Vel I Min Slope I Max Slope I Min Cover I
I 2.00 ft/s r---15.00W-s -I 0.50% I 2.00% I 3.00 ft I ---
IDrop across MH I 0.00 ft IEx/lnfil Rate I 0.00 inlhr
Record Id: P-018
ISection Shape: Circular
IUniform Flow Method: I Manning's ICoefficient: I 0.012
IRouting Method: I Travel Time Shift IContributing Hyd I
IDnNode I N-014 IUpNode I N-OIS
IMaterial I Closed Conduits, Concrete Pipe ISize I 12 in Diam
lEnt Losses I Groove End w/Headwall
ILength I 205.00 ft ISlope I 1.41%
Iup Invert I 448.14 ft IDn Invert I 445.25 ft
I Conduit Constraints
I Min Vel I Max Vel I Min Slope I Max Slope I Min Cover
I 2.00 ft/s I 15.00 ft/s I 0.50% I 2.00% I 3.00 ft
IDrop across MH 0.00 ft IExlInfil Rate I 0.00 inlhr I
----~--,
Record Id: P-019
ISection Shape: I Circular I
luniform Flow Method: I Manning's Icoefficient: 0.012
IRouting Method: I-Travel Time Shift IContributing H;;d-
IDnNode I N-018 IUpNode N-019
IMaterial I Closed Conduits, Concrete Pipe ISize I 12 in Diam
lEnt Losses I -------
Groove End w/Headwall
ILength --I 33.00 ft [Slope I 3.39%
Iup Invert I 449.26 ft IDn Invert I 448.14 ft
I
-
Conduit Constraints
j I Min Vel I Max Vel I Min Slope I Max Slope I Min Cover
I 2.00 ft/s T 15.00 fils I 0.50% I 2.00% ._--r---3.00 ft
IDrop across MH I 0.00 ft IEx/lnfil Rate I 0.00 in/hr
Record Id: P-020
ISection Shape: Circular
IUniform Flow Method: I Manning's ICoefficient: I 0.012
IRouting Method: I Travel Time Shift IContributing Hyd I
IDnNode I N-009 IUpNode I N-020
IMaterial I unspecified ISize I 6 in Diam
lEnt Losses I Groove End w/Headwall
ILength I 20.00 ft ISlope I 9.10%
Iup Invert I 438.24 ft IDn Invert I 436.42 ft
I Conduit Constraints
I Min Vel I Max Vel I Min Slope I Max Slope I Min Cover
I 2.00 ft/s I 15.00 ft/s I 0.50% I 2.00% I 3.00 ft
IDrop across MH I 0.00 ft IEx/lnfil Rate I 0.00 inlhr
Record Id: P-021
ISection Shape: Circular
IUniform Flow Method: Manning's ICoefficient: I 0.012
IRouting Method: Travel Time Shift IContributing Hyd I
IDnNode N-OII-~--IUpNode I N-021
IMaterial unspecified ISize ~Diam-
lEnt Losses Groove End w/Headwall
ILength 22.00 ft ISlope I 11.64%
Iup Invert 433.53 ft IDn Invert I 430.97 ft
I Conduit Constraints
I Min Vel I Max Vel I Min Slope IMaxSlope I Min Cover
I 2.00 ft/s I 15.00 ft/s I 0.50% I 2.00% I 3.00 ft
IDrop across MH I 0.00 ft IEx/lnfil Rate I 0.00 inlhr
Record Id: P-022
ISection Shape: Circular
IUniform Flow Method: I Manning's rc;;efficient: I 0.012
IRouting Method: I Travel Time Shift IContributing Hyd I
IDnNode I N-OII IUpNode I N-022
IMaterial I unspecified ISize I 6 in Diam
lEnt Losses I Groove End w/Headwall
ILength I 43.00 ft ISlope I 5.60%
Iup Invert I 433.38 ft IDn Invert I 430.97 ft
I Conduit Constraints
I Min Vel I Max Vel I Min Slope I Max Slope I Min Cover
I 2.00 ft/s I 15.00 fils I 0.50% I 2.00% I 3.00 ft
IDrop across MH I 0.00 ft IEx/lnfil Rate I 0.00 inlhr
Record Id: P-023
ISection Shape: Circular
IUniform Flow Method: Manning's ICoefficient: 0.012
IRouting Method: Travel Time Shift IContributing Hyd
IDnNode I N-015 IUpNode I N-023
IMaterial I unspecified ISize I 6 in Diam
lEnt Losses I Groove End w/Headwall
ILength I 17.00 ft ISlope 1 2 .18 %--
Iup Invert I 446.24 ft IDn Invert I 445.87 ft
I Conduit Constraints
----
I Min Vel I Max Vel I Min Slope I Max Slope I Min Cover
I 2.00 ft/s I 15.00 fils I 0.50% I 2.00% I 3.00 ft
IDrop across MH I 0.00 ft IEx/lnfil Rate I 0.00 in/hr
Record Id: P-024
ISection Shape: Circular
IUniform Flow Method: I Manning's ICoefficient: I 0.012
IRouting Method: I Travel Time Shift IContributing Hyd I
IDnNode I N-019 IUpNode I N-024
IMaterial
-~,---._.
I ISize I unspecified 8 in Diam
lEnt Losses I
------
Groove End w/Headwall
ILength I 13.00 ft ISlope I 1.62%
Iup Invert I 449.97 ft IDn Invert I 449.76 ft
I Conduit Constraints
I Min Vel I Max Vel I Min Slope I Max Slope I Min Cover
I 2.00 ft/s I 15.00 fils I 0.50% I 2.00% I
IDrop across MH I 0.00 ft IEX/lnfil Rate
Node Records
Record Id: N-003
IDescrip: IIncrement 10.10 ft I
rIS-ta-rt-E-I.--rI4-1-6-.5-0-ft---------------~IM~a-x=EI~.----il~42~1~.5~0~ft-----
~IV=ol=·d=R=at=io~;I=lO=O=.O=o================Ir_----___ ;I __________ r ICondition IProposed IStructure Type ICB-TYPE 2-48
lEnt Ke IGroove End w/Headwall (ke=0.20) IChannelization INo Special Shape
3.00 ft
I 0.00 inlhr
[Catch [0.00 ft [Bottom Area [12.5664 sf
[MH/CB Type Node
Record Id: N-004
[Oescrip: [Increment [0.10 ft I
[Start EI. [417.64 ft -[Max El. r---[42C-:8-.1-c4-:ft---
[Void Ratio [100.00 [[ r
[Condition [Proposed [Structure Type [CB-TYPE 2-48
[Ent Ke [Groove End w/Headwall (ke~0.20) ~~~;;;;;: [No Special Shape
[Catch [ilOofi [Bottom Area [12.5664 sf
[MH/CB Type Node
Record Id: N-005
[Oescrip: [ [Increment [0.10 ft I
ICSt-art-=E~I.-r[4-:2~1.~95~ft--------rIM~ax~E=I-.--r[4~2~8.-:4~5~ft----
,[V_O_id_R_m_io_r[_10_0_.0_0 _________ [ r[ _____ r
ICondition [Proposed ~t~Type [CB-TYPE 2-48
[Ent Ke ~ End w/Headwall (ke~0.20) [Channelization [No Special Shape
[Catch [0.00 ft [Bottom Area [12.5664 sf
[MH/CB Type Node
Record Id: N-006
[Oescrip: [Increment [0.10 ft I
[Start El. [426.51 ft [Max EI. [431.51 ft
[Void Ratio [100.00 [[ r
[Condition [Proposed C::-[S-tru-c-tu-r-e -T-yp-e-'[C-=-B=-_-=T=Y=P-=EC-:2'-_4-c-8:--
[Ent Ke [Groove End w/Headwall (ke=0.20) [Channelization [No Special Shape
[Catch [0.00 ft [Bottom Area [12.5664 sf
[MH/CB Type Node
Record Id: N-007
IDcscrip: IIncrement 10.1 ° it
IStart EI. 142s.66 it IMax El. 1433.66 ft
IVoid Ratio :-110_o_.°_° ________ 1 I
ICondition IProposed ~~~Type rIC-B-.T-Y-P-E-2-.-4-S-
~-IGr~-;;·veEnd w/Headwall (ke=0.20) IChannelization INo Special Shape
ICatch 10.00 ft IBottom Area 112.5664 sf
IMH/CB Type Node
Record Id: N-008
rDe;~·-r IIncrement 10.10 ft I
~
IStart EI. 1430.40 ft IMax EI. 1435.40 ft
!Void Ratio 1100.00 I I r
ICondition IProposed IStructure Type ICB. TYPE 2·48
lEnt Ke IGroove End w/Headwall (ke=0.20) IChannelization INo Special Shape
I Catch 10.00 ft IBottom Area 112.5664 sf
IMH/CB Type Node
Record Id: N-009
IDescrip: I Increment 10.10 it I :----:---:----~-:--
IStart EI. 1435.92 ft IMax El. 1440.92 ft
:-IV_01_·d_R_m_io_~II_O_O._OO _________ :I ____ .~I _____ r
ICondition IProposed IStructure Type ICB.TYPE I
lEnt Ke IGroove End wlHeadwall (ke=0.20) IChannelization INo Special Shape
ICatch 10.00 it IBottom Area 13.97 sf
IMH/CB Type Node
Record Id: N-OtO
IDescrip: IIncrement 10.1 ° ft I :----:---~--~~-
IStart El. 1441.os ft IMax El. 1446.08 it :----------------------r---------r----------r
IVoid Ratio :-11_00_.0_0 ________ :-1 ____ :-1 ____ _
ICondition IProposed IStructure Type ICB. TYPE I
lEnt Ke IGroove End w/Hcadwall (ke=0.20) IChannelization ~~~
ICatch 10.00 ft IBottom Area 13.97 sf
IMH/CB Type Node
Record Id: N-Oll
IDescrip: I IIncrement 10.1 0 ft I
IStart El. rI43:-cO-Ac-:-7--=-ft--------rIM-::-a-xcE-:-1. --rI43"-:5-:-A:-::7--=-ft---
IVoid Ratio Ir:--Io::-::o-::.O-::-O--------r-I ----I I
ICondition IProposed IStructure Type Ic-C-B--T-Y-P-E-2---48-
lEnt Ke IGroove End wlHeadwall (ke=0.20) IChannelization INo Special Sh~p;;-
ICatch 10.00 ft IBottom Area 112.5664 sf
IMHlCB Type Node
Record Id: N-012
IDescrip: I IIncrement 10.10 ft I
ICSt-m-=El-:-.-rI4--=-3--=-5.-::-18::-::ft~-------rlM~ax~E=I-.--rI4::-::4--=-0.--=-1-:-8cft----
IVoid Ratio 1100.00 1---------1 I
ICondition IProposed IStructure Type ICB-TYPE 2-48
lEnt Ke IGroove End w/Headwall (ke=0.20) ~~;;-iization INo Special Shape
ICatch 10.00 ft IBottom Area 112.5664 sf
IMH/CB Type Node
Record Id: N-013
IDescrip: I IIncrement 10.10 ft
IStart El. 1435.31 ft IMax El. 1440.18 ft
IVoid Ratio 1100.00 I I
ICondition IProposed IC::cS-tru-c-tu-re~T=-yp-e·i-:IC=BC-:-_T=Y=-P=E::--:-1 --
lEnt Ke IGroove End w/Headwall (ke=0.20) IChannelization INo Special Shape
ICatch 10.00 ft IBottom Area 13.97 sf
IMHlCB Type Node
Record Id: N-014
IDescrip: I IIncrement 10.10 ft I
IStart El. 1445.25 ft IMax EI. rc-145-:C:0-'.0C-::6--=ft---
IVoid Ratio 1100.00 I I r
ICondition IProposed [Structure Type ICB-TYPE 2-48
lEnt Ke IGroove End w/Headwall (ke=0.20) IChannelization INo Special Shape
ICatch 10.00 ft IBottom Area 112.5664 sf
IMH/CB Type Node
Record Id: N-OIS
IDescrip: IIncrement 10.10 ft II
IStart El. 1445.37 ft IMax EI. 1rc-45-:C:0-'.0C-::6--=ft---
IVoid Ratio 1100.00 __ n_____ I I r
ICondition IProposed IStructure Type [CS-TYPE I
lEnt Ke IGroove End w/Headwall (ke=0.20) IChannelization INo Special Shape
ICatch 10.00 ft IBottom Area 13.97 sf
IMH/CB Type Node
Record Id: N-016
IDescrip: IIncrement 10.10 ft I
IStart EI. 1446.27 ft IMax El. 1r-4S-I-.2-7-ft---
IVoid Ratio 1100.00 I I r
ICondition IProposed IStructure Type ICB-TYPE I
lEnt Ke IGroove End w/Headwall (ke=0.20) IChannelization INo Special Shape
ICatch 10.00 ft IBottom Area 13.97 sf
IMH/CB Type Node
Record Id: N-017
IDescrip: IIncrement 10.10 ft
IStart El. 1447.86 ft IMaxEI. 1452.86 ft
ICondition IProposed IStructure Type ICB-TYPE I
lEnt Ke IGroove End w/Headwall (ke=0.20) IChannelization INo Special Shape
rc;rtch--Io.oo ft IBottom Area 13.97 sf
IMH/CB Type Node
Record ld: N-018
IDesctip: Ilncrement 10.10 ft I
IStart El. 1448.14 ft IMax El. rI4S-:C-S-c.0-7-=-ft---
IVoid Ratio flOD.OO-I I --r
ICondition IProposed IStructure Type ICB-TYPE I
lEnt Ke IGroove End w/Headwall (ke=0.20) IChannelization INo Special Shape
ICatch 10.00 ft IBottom Area 13.97 sf
rMHICB Type Node ------
Record ld: N-019
IDescrip: Ilncrement 10.1 0 ft I
~IS-ta-rt~E~1.--rI4-c4~9~.2~6~ft---------'I~M~ax-E=I~.---rI4~S~4-:-.2~6~ft--
rIV_ol_d_R_ru_io_rll_O_O._OO _________ rl __ ·==~_-_rI _____ r
ICondition IProposed IStructure Type ICB-TYPE I
lEnt Ke IGroove End w/Headwall (ke=0.20) IChannelization INo Special Shape
ICatch 10.00 ft IBottom Area 13.97 sf
IMH/CB Type Node
Record Id: N-020
IDescrip: I IIncrement 10.1 0 ft I
IStart El. 1438.24 ft IMax El. 1443.24 ft
IVoid Ratio 1100.00 Ir::----=,---rl =-==-__ r
ICondition IProposed IStructure Type ICB-TYPE I
lEnt Ke IGroove End w/Headwall (ke=0.20) IChannelization INo Special Shape
ICatch 10.00 ft IBottom Area 13.97 sf
IMH/CB Type Node
Record Id: N-OZl
IOescrip: IIncrement 10.10 ft I
~
IStart El. 1433.53 ft IMax El.[438.53 ft
[V;;;dRat~1100.00 I I I
!Condition IProposed IStructure Type ICB-TYPE I
lEnt Ke IGroove End w/Headwall (ke=0.20) IChannelization INo Special Shape
ICatch 10.00 ft IBottom Area 13.97 sf
IMH/CB Type Node
Record ld: N-022
IOescrip: I Iincrement 10.10 ft I
~
IStart El. 1433.38 ft IMax El. 1437.38 ft
IVoidRatiolIOO.OO I I I
ICondition IProposed IStructure Type ICB-TYPE I
lEnt Ke IGroove End w/Headwall·(ke=0.20) IChannelization INo Special Shape
ICatch 10.00 ft IBottom Area 13.97 sf
IMH/CB Type Node
Record ld: N-OZ3
IOescrip: I IIncrement 10.10 ft I ~~--~-:--
IStart El. 1446.24 ft IMax El. 1450.74 ft
~IV_O_id_R_a_tio_;I_l0_0_.0_0 ________________ ~1 ________ ;1 __________ 1
ICondition IProposed IStructure Type ICB-TYPE I
lEnt Ke IGroove End w/Headwall (ke=0.20) IChannelization INo Special Shape
ICatch 10.00 ft IBottom Area 13.97 sf
IMH/CB Type Node
Record ld: N-024
IDcscrip: Ilncrement 10.1 ° ft I
IStart El. rI44-:-:9:-c.9c::7--=ft--------f::-IM-::-a-x-=E-:-I.--rI4-::-:S3:-.4-:-=7c-::ft---
:IV=oi=d=R=m=io::ll=O=O.O=o===============-_,I _____ I r ICondition IProposed IStructure Type ICB-TYPE1-
Ifut-K~--IG~~~~~-E;d;"7H~~dwall (ke=0.20) IChannelization INo Special Shape
ICatch 10.00 ft IBottom Area 13.97 sf
IMH/CB Type Node
Contributing Drainage Areas
Record Id: 8-005
F ~ SeattleRecord Id: 8-006
Design Method Rational I IDF Table:
I
I R";oo,1 I IOFT.b1" SeattleRecord Id: 8-007 I
I
Design Method
I R,';oo,1 I IOFT.b1" SeattleRecord Id: 8-008
Design Method
I R,"'" lID. T.b1"
SeattleRecord Id: 8-009
Design Method
Design Method FI~D-;;::-Se.tt!.R=nI Id, B-1lIO Rational IDF Table:
I R,,;mm1 I IDF T.b1" SeattleRecord Id: 8-011
Design Method
I Rotimml I IOF T.b1" SeattleRecord Id: 8-012
Design Method
I ""';,." IIDFT.b1" SeattleRecord Id: 8-013
Design Method
~~ SeattleRecord Id: B-014
Design Method I Rational I IDF Table:
F ~ SeattleRecord Id~B-oi5
Design Method Rational I IDF Table:
~~ SeattleRecord Id: B-016
Design Method I Rational I IDF Table:
-~-----------.----~ -----
i
I_Om! IIDFT'b"' I
Design Method
roa.d.it"'.'d Id, B-017
r Rm'om! IIDFT'bI"
SeattleRecord Id: B-018 -I Design Method
~.-.---. --.~----------------
I Rooo .• I
SeattleRecord Id: B-019 I
I Design Method IDFTable:
I
Design Method l:o~";T:=-So.tt1.Roo",lld, ...,,. Rational IDF Table:
------
I R,Hom! I IOFT,bl" SeattleRecord Id: B-021
Design Method
I R"'OMI IIDF T.bl" SeattleRecord Id: B-022
Design Method
I """""'" I IDF T,bl" SeattleRecord Id: B-023
Design Method
I Rooo.. lID. l',bl" SeattleRecord Id: B-024
Design Method
ROUTEHYD [J THRU [Rosa) USING [100 yr) AND [Seattle) NOTZERO RELATIVE RATIONAL
Rational Method analysis
Reach 10 Area (ac) TC(min) i (in/hr) Flow (ds)
Full Q
Full ratio nDepth Size nVel (ft/s) Nel (ft/s) CArea (ds) (ft)
P-024 0.37 6.3 3.209 0.8809 1.6703 0.5274 0.3441 8 in Diam 4.8474 4.7859 8-024
12in
P-019 0.51 6.3447 3.1966 1.1971 7.1297 0.1679 0.2768 Diam 6.7592 9.0778 8-019
12 in
P-018 1.38 6.4261 3.1745 2.746 4.5952 0.5976 0.5571 Diam 6.1067 5.8507 8-018
P-023 0.36 6.3 3.209 0.852 0.8999 0.9467 0.3877 6 in Diam 5.2156 4.5832 8-023
12 in
P-015 1.51 6.3543 3.194 2.9289 2.7908 1.0495 0.8732 Diam 4.0256 3.5533 8-015
12 in
P-017 0.51 6.3 3.209 1.0766 4.7399 0.2271 0.3239 Diam 4.8867 6.035 8-017
12 in
P-016 0.87 6.6615 3.1129 1.7899 6.7032 0.267 0.3528 Diam 7.2278 8.5348 8-016
12in
P-014 3.89 6.9856 3.0333 7.2678 8.6624 0.839 0.7016 Diam 12.3463 11.0294 8-014 .
12 in
P-013 0.13 6.3 3.209 0.292 2.7908 0.1046 0.2179 Diam 2.3114 3.5533 8-013
12in
P-012 4.15 7.2569 2.971 7.6592 11.7611 0.6512 0.5879 Diam 15.951 14.9747 8-012
P-022 0.52 6.3 3.209 1.2306 1.4423 0.8532 0.3557 6 in Diam 8.2382 7.3458 8-022
P-021 0.51 6.3 3.209 1.2018 2.0795 0.5779 0.2728 6 in Diam 10.9709 10.5906 8-021
18in
P-011 5.21 7.3102 2.9592 9.9324 20.5135 0.4842 0.7362 Diam 11.5114 11.6083 8-011
12in
P-OlO 0.68 6.3 3.209 0.921 7.6808 0.1199 0.2342 Diam 6.5776 9.7796 8-010
P-020 0.19 6.3 3.209 0.4444 1.8386 0.2417 0.1672 6 in Diam 7.7249 9.3641 8-020
12in
P-009 0.98 6.6319 3.1204 1.5758 8.7902 0.1793 0.2865 Diam 8.4777 11.1921 8-009
12in
P-008 1.08 6.8423 3.0678 1.7655 8.8867 0.1987 0.3023 Diam 8.815 11.3148 B-008
18 in
P-007 6.33 7.3913 2.9414 11.6524 27.5053 0.4236 0.6817 Diam 14.914 15.5648 B-007
18in
P-006 6.41 7.4326 2.9325 11.7901 33.1576 0.3556 0.6176 Diam 17.1849 18.7633 B-006
18in
P-005 0.11 6.3 3.209 0.2343 48.3538 0.0048 0.0752 Diam 7.0615 27.3627 B-005
24in
P-004 6.52 7.485 2.9213 11.9583 20.3857 0.5866 1.1013 Diam 6.7447 6.489
HGl Analysis
From
To Node HG EI (ft) App (ft) lunct Loss Adjusted
Node Bend (ft) (ft) HG EI (ft) Max EI (ft)
426.3
No approach losses at node N-006 because inverts and/or crowns are offset.
N-004 N-003 426.7901 0.6912 0.6581 0.0115 426.7686 428.14
N-006 N-004 428.5084 ------0.0699 ------428.5784 431.51
N-007 N-006 430.6006 ------0.683 0.0675 431.3511 433.66
No approach losses at node N-012 because inverts and/or crowns are offset.
N-Oll N-007 432.364 1.4767 0.6114 0.3398 431.8385 435.47
N-012 N-Oll 438.7616 ------0.115 0.0443 438.9209 440.18
N-014 N-012 448.5255 ------0.3272 0.1551 449.0078 450.06
N-018 N-014 450.2673 0.0361 0.0144 ------450.2457 455.07
No approach losses at node N-024 because inverts and/or crowns are offset.
N-019 N-018 I 450.3205 0.3649 0.3143 ------450.2699 454.26
N-024 N-019 450.6559 ------------------450.6559 453.47
No approach losses at node N-023 because inverts and/or crowns are offset.
N-015 N-014 449.3991 0.2924 0.0061 ------449.1128 450.06
N-023 N-015 449.7951 ------------------449.7951 450.74
N-016 N-014 449.1773 0.0292 0.002 ------449.1501 451.27
N-017 N-016 449.2672 ------------------449.2672 452.86
N-013 N-012 438.9249 ------------------438.9249 440.18 ,
N-022 N-011 434.9167 ------ ------------434.9167 437.38
N-021 N-011 435.0346 ------------------435.0346 438.53
N-008 N-007 431.514 0.0625 0.0119 ------431.4634 435.4
N-009 N-008 436.6714 ------0.0053 0.2185 436.8951 440.92
N-010 N-009 441.624 ------ ------------441.624 446.08
N-020 N-009 438.7489 ------------------438.7489 443.24
N-005 N-004 426.769 ------------------426.769 428.45
Conduit Notes
Reach
HWDepth HW/D Q(cfs} TW Depth Dc (ft) Dn (ft) Comment (ft) ratio (ft)
P-004 10.7901 5.3951 11.96 10.3 1.2426 1.1013 Outlet Control
P-006 2.4984 1.6656 11.79 5.3186 1.3058 0.6176 SuperCrit flow, Inlet end controls
P-007 2.4406 1.6271 11.65 2.5684 1.2998 0.6817 SuperCrit flow, Inlet end controls
P-Oll 4.204 2.8027 9.93 3.1911 1.2154 0.7362 Outlet Control
P-012 3.5816 3.5816 7.66 1.3685 0.9818 0.5879 SuperCrit flow, Inlet end controls
P-014 3.2755 3.2755 7.27 3.7409 0.9781 0.7016 SuperCrit flow, Inlet end controls
P-018 5.0174 5.0174 2.75 3.7578 0.7106 0.5571 Outlet Control
P-019 2.1805 2.1805 1.2 2.1057 0.4613 0.2768 Outlet Control
P-024 0.6859 1.029 0.88 0.5099 0.445 0.3441 SuperCrit flow, Inlet end controls
P-015 4.1487 4.1487 2.93 3.7578 0.7342 0.8732 Outlet Control
P-023 3.9257 7.8515 0.85 3.2428 0.4535 0.3877 Outlet Control
P-016 3.9273 3.9273 1.79 3.7578 0.5697 0.3528 Outlet Control
P-017 2.9972 2.9972 1.08 2.8801 0.4364 0.3239 Outlet Control
P-013 3.7449 3.7449 0.29 3.7409 0.2225 0.2179 Outlet Control
P-022 1.5367 3.0733 1.23 0.8685 0.487 0.3557 SuperCrit flow, Inlet end controls
P-021 1.5046 3.0092 1.2 0.8685 0.4859 0.2728 SuperCrit flow, Inlet end controls
P-008 2.854 2.854 1.77 2.6911 0.5656 0.3023 Outlet Control
P-009 0.7514 0.7514 1.58 1.0634 0.5329 0.2865 SuperCrit flow, Inlet end controls
P-OlO 0.544 0.544 0.92 0.9751 0.4025 0.2342 SuperCrit flow, Inlet end controls
P-020 0.5089 1.0179 0.44 0.4751 0.3398 0.1672 SuperCrit flow, Inlet end controls
P-005 9.629 6.4193 0.23 9.6286 0.178 0.0752 Outlet Control
/
i
~l
1351ft
%
0346ft
4387.t89ft
~.",
% 1624ft
4502457 ft
'99ft
45065
72ft
I N-OVTLET •
Pond Outlet
N-0028
P-l1028
Layout Report: Outlet
I Event IPrecip (in)
12 yr 24 hr I 2.00
110 year I 2.90
125 year I 3.40
1I00year I 3.90
Reach Records
Record Id: P-OOt
ISection Shape: Circular-~----I
IUniform Flow Method: I Manning's ICoefficient: I 0.012
IRouting Method: I Travel Time Shift IContributing Hyd I
IDnNode I
-~-~
IUpNode I N-OUTLET N-OOI
IMaterial I Closed Conduits, Concrete Pipe ISize 118 in Diam
lEnt Losses I Groove End w/Headwall
ILength I 43.00 ft ISlope I 2.00%
Iup Invert 1-413.72 ft IDn Invert I 412.86ft
I Conduit Constraints
I Min Vel I Max Vel I Miu Slope I Max Slope I Min Cover
I 2.00 fils I 15.00 ft/s I 0.50% I 2.00% I 3.00 ft
IDrop across MH I 0.00 ft IExlInfil Rate I 0.00 inlhr
Record Id: P-002A
ISection Shape: Circular
IUniform Flow Method: I Manning's ICoefficient: I 0.012
IRouting Method: I Travel Time Shift IContributing Hyd I
IDnNode I N-OOI IUpNode I N-002A
IMaterial I Closed Conduits, Concrete Pipe ISize 118 in Diam
lEnt Losses I Groove End w/Headwall
ILength I 31.00 ft ISlope I 5.97%
Iup Invert I 415.57 ft IDn Invert lillT2fi
I Conduit Constraints
I MinVel I-~M;x-Vel I Min Slope I Max Slope I Min Cover
I 2.00 ft/s I 15.00 ft/s I 0.50% I 2.00% I 3.00 ft
IDrop across MH I 0.00 ft IEx/lnm Rate I 0.00 inlhr
Record Id: P-002B
ISection Shape: Circular
~form Flow Method-;---r---Manning's ICoefficient: I 0.012
IRouting Method: I Travel Time Shift IContributing Hyd I
IDnNode I N-STORMGA TE IUpNode I N-002B
IMaterial I Closed Conduits, Concrete Pipe ISize 118 in Diam
lEnt Losses I
--
Groove End w/Headwall
ILength I 42.00 ft ISlope 1 0.50%
Iup Invert I 420.41 ft IDn Invert I 420.20 ft
[I
---
j
Conduit Constraints
II
Min Vel ~Ve1 I Min Slope I Max Slope I Min Cover
I 2.00 ft/s I 15.00 ft/s I 0.50% 1 2.00 % I 3.00 ft J
IDrop across MH I 0.00 ft IEx/lnm Rate I 0.00 inlhr
Record Id: P-STORMGATE
ISection Shape: Circular
IUniform Flow Method: I Manning's ICoefficient: I 0.012
IRouting Method: I Travel Time Shift IContributing Hyd I
IDnNode I N-002A IUpNode IN-STORMGA TE
IMaterial IClosed Conduits, Concrete Pipe ISize I 18 inDiam
lEnt Losses I Groove End w/Headwall
ILength I 11.00 ft ISlope I 42.09%
Iup Invert I 420.20 ft IDn Invert I 415.57 ft
II
Conduit Constraints
I Min Vel I Max Vel I Min Slope I Max Slope I Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 13.00 ft
IDrop across MH 0.00 ft IEx/lnfil Rate I 0.00 in/hr
Node Records
Record Id: N-OOI
IOescrip: Iincrement 10.10 ft I
~ IStart El. 1413.72 ft IMa~-fl·~-1417.28 ft
[Void Ratio 1100.00 I f
ICondition IExisting IStructure Type ICB-TYPE 2-48
lEnt Ke IGroove End w/Headwall (ke=0.20) IChannelization INo Special Shape
lC~tZh _ .. -10.00 ft IBottom Area 112.5664 sf
IMH/CB Type Node ....
Record Id: N-002A
IOescrip: I IIncrement 10.10 ft I
[&artEi. 1415.57 ft IMax El. 1420.57 ft I
IVoidRatiol100.00 --:-f _ .. -_-_" _-_-.:~I----_f
ICondition IExisting IStructure Type ICB.TYPE 2-48
lEnt Ke IGroove End w/Headwall (ke=0.20) IChannelization INo Special Shape
ICatch 10.00 ft IBottom Area 112.5664 sf
IMHlCB Type Node
Record Jd: N-002B
IOescrip: :-.-~~~~~~~~~_:-IIn_c_re_m_e_nt~_~I_O._IO~ft~~_1
IStart El. 1420.41 ft IMax El. 1427.20 ft
IVoid Ratio 1100.00 I I r
ICondition IExisting IStructure Type ICB-TYPE 2-48
lEnt Ke IGroove End w/Headwall (ke=0.20) IChannelization INo Special Shape
ICatch 10.00 ft IBottom Area 112.5664 sf
IMH/CB Type Node
Record Id: N-OUTLET
IDescrip:--II~~~~ent--10.1 0 ft
IStart El. 1412.86 ft IMax El. 1C'C4c--14'--.6:-:6--=ft---
IVoid Ratio 1100.00 I Ic--___ _
ICondition Ir-E-xi-st-in-g---IStructure Type IDummy
lEnt Ke IGroove End w/Headwall (ke~0.20) IChannelization Ir-N-o-S-p-ec-ia-]-S-ha-p-e
ICatch 10.00 ft IBottom Area 10.00 sf
IMH/CB Type Node
Record Id: N-STORMGATE
I~t::.: 1420.20 ft I:::e~]~nt 1~~15~0~ ft----I
IVoid Ratio I 100.00 I ---r
~n IExisting IStructure Type ICB-TYPE 2-48
lEnt Ke IGroove End w/Headwall (ke~0.20) r~i~-;;ti~-;'; rNo Special Shape
ICatch 10.00 ft IBottom Area 112.5664 sf
IMH/CB Type Node
Licensed to: Engenious Systems, Inc.
Appended on: Tuesday, April 15, 2014 9:18:24 AM
ROUTEHYD [J THRU [Outlet] USING [100 year] AND [J NOTZERO RELATIVE Fixed Flow
Gravity Analysis using fixed flowrates
Reach ID Flow (ds)
Full Q
Full ratio
nDepth
Size nVel (ftls) fVel (ftls) CFlow (ds) (ft)
18in
P-002B 7.9 8.0683 0.9791 1.2028 Diam 5.2013 4.5657 7.9
18 in
P-STORMGATE 7.9 74.0274 0.1067 0.3298 Diam 27.4272 41.8909 0
18 in
P-002A 7.9 27.8742 0.2834 0.5465 Diam 13.5728 15.7735 0
18 in
P-001 7.9 16.1366 0.4896 0.7409 Diam 9.081 9.1315 0 I
HGL Analysis
From Node To Node HG EI (ft) App (ft) Bend (ft) Junct Loss Adjusted
(ft) HG EI {ft} Max EI {ft}l
414.36
N-001 N-OUTLET 415.4488 ------0.0309 ------415.4798 417.28
N-002A N-001 417.3048 ------0.0495 ------417.3543 420.57
N-STORMGATE N-002A 421.989 ------0.0113 ------422.0002 425
N-002B N-STORMGATE 422.5739 ------------------422.5739 427.2
Conduit Notes
Reach HW Depth (ftl HW/D Q(cfsl
TWDepth
Dc (ftl On (ftl Comment
ratio (ftl
P-OOl 1.7288 1.1525 7.9 1.5 1.0897 0.7409 SuperCrit flow, Inlet end controls
P-002A 1.7348 1.1565 7.9 1.7598 1.0897 0.5465 SuperCrit flow, Inlet end controls
P-STORMGATE 1.789 1.1926 7.9 1.7843 1.0897 0.3298 SuperCrit flow, Inlet end controls
P-002B 2.3739 1.5826 7.9 1.8002 1.0897 1.2028 Outlet Control
41436 ft •
APPENDIXD
Operations and Maintenance Manual
KING COUJ\TY, WASHINGTOJ\, SURFACE WATER DESIG~ MAJ\UAL
APPENDIX A
MAINTENANCE REQUIREMENTS FOR FLOW
CONTROL, CONVEYANCE, AND WQ FACILITIES
NO.1 -DETENTION PONDS
Maintenance Defect or Problem Conditions When Maintenance Is Needed Results Expected When
Component Maintenance Is Performed
General Trash & Debris Any trash and debris which exceed 1 cubic foot Trash and debris cleared from site.
per 1 ,000 square feet (this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Poisonous Vegetation Any poisonous or nuisance vegetation which may No danger of poisonous vegetation
or Noxious Weeds constitute a hazard to County personnel or the where County personnel or the
public. public might normally be.
Coordination with Seattle-King
County Health Department
Contaminants and Oil, gasoline, or other contaminants of one gaUon No contaminants present other than
Pollution or more, or any amount found that could: a surface film. (Coordination with
1) cause damage to plant, animal, or marine life: Seattle/King County Health
2) constitute a fire hazard; or 3) be flushed Department)
downstream during rain storms.
Unmowed If facility is located in private residential area, When mowing is needed.
Grass/Ground Cover mowing is needed when grass exceeds 18 grass/ground cover should be
inches in height. In other areas, the general mowed to 2 inches in height.
policy is to make the pond site match adjacent Mowing of selected higher use areas
ground cover and terrain as long as there is no rather than the entire slope may be
interference with the function of the facility. acceptable for some situations.
Rodent Holes Any evidence of rodent holes if facility is acting Rodents destroyed and dam or berm
as a dam or berm. or any evidence of water repaired. (Coordination with
piping through dam or berm via rodent holes or Seattle/King County Health
other causes. Department)
Insects When insects such as wasps and hornets Insects destroyed or removed from
interfere with maintenance activities. Mosquito site. Mosquito control: Swallow
complaints accompanied by presence of high nesting boxes or approved larvicide
mosquito larvae concentrations (aquatic phase). applied.
Tree Growth Tree growth threatens integrity of berms acting Trees do not hinder maintenance
as dams. does not allow maintenance access, or activities. Harvested trees should
interferes with maintenance activity (i.e., slope be recycled into mulch or other
mowing, silt removal, vactoring, or equipment beneficial uses (e.g., alders for
movements). If trees are a threat to berm firewood).
integrity or not interfering with access, leave
trees alone.
2005 Surface Water Design Manual-Appendix A 1/24/2005
A-I
APPE~DIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONV!OYA~CE, AND WQ fACILITIES
NO.1 -DETENTION PONDS
Maintenance Defect or Problem Conditions When Maintenance Is Needed Results Expected When
Component Maintenance Is Performed
Side Slopes of Pond Erosion Eroded damage over 2 inches deep where cause Slopes should be stabilized by using
of damage is stiU present or where there is appropriate erosion control
potential for continued erosion. measure(s); e.g., rock
Any erosion observed on a compacted berm
reinforcement, planting of grass,
embankment.
compaction.
If erosion is occurring on compacted
berms a licensed civil engineer
should be consulted to resolve
source of erosion.
Storage Area Sediment Accumulated sediment that exceeds 10% of the Sediment cleaned out to designed
designed pond depth. pond shape and depth; pond
reseeded if necessary to control
erosion.
Uner Damage Liner is visible and has more than three 1f,.-inch Liner repaired or replaced.
(If Applicable) holes in it.
Pond Berms (Dikes) Settlement Any part of benn that has settled 4 inches lower Dike should be built back to the
than the design elevation. Settling can be an design elevation.
indication of more severe problems with the berm
or outlet works. A licensed civil engineer should
be consulted to determine the source of the
settlement.
Emergency Tree Growth Tree growth on emergency spillways create Trees should be removed. If root
OverilowJSpillway blockage problems and may cause failure of the system is small (base less than 4
and Berms over 4 berm due to uncontrolled overtopping. inches) the root system may be left
feet in height.
Tree growth on berms over 4 feet in height may
in place. Otherwise the roots should
be removed and the berm restored.
lead to piping through the berm which could lead A licensed civil engineer should be
to failure of the berm. consulted for proper berm/spillway
restoration.
Emergency Rock Missing Only one layer of rock exists above native soil in Replace rocks to design standards.
Overflow/Spillway area five square feet or larger, or any exposure
of native soil at the top of out flow path of
spillway. Rip-rap on inside slopes need not be
replaced.
1/24/2005 2005 Surface Water Design Manual-Appendix A
A-2
AI'PlcNlJlX A MAII\TLNAI\C1' REQUIREMENTS FOR FLOW CONTROl.. CONVEYA~Cl'. AND WQ FACILITIES
NO.4 -CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Perfonned
General Trash and Debris Distance between debris build-up and bottom of All trash and debris removed.
(Includes Sediment) orifice plate is less than 1.5 feet.
Structural Damage Structure is not securely attached to manhole Structure securely attached to wall
wall and outlet pipe structure should support at and outlet pipe
least 1,000 Ibs of up or down pressure.
Structure is not in upright position (allow up to Structure in correct position.
10% from plumb).
Connections to outlet pipe are not watertight and Connections to outlet pipe are water
show signs of rust. tight; structure repaired or replaced
and works as designed.
Any holes--other than deSigned holes-in the Structure has no holes other than
structure. designed holes.
Cleanout Gate Damaged or Missing Cleanout gate is not watertight or is missing. Gate is watertight and works as
designed.
Gate cannot be moved up and down by one Gate moves up and down easily and
maintenance person. is watertight.
Chain/rod leading to gate is missing or damaged. Chain is in place and works as
designed.
Gate is rusted over 50% of its surface area. Gate is repaired or replaced to meet
design standards.
Orifice Plate Damaged or Missing Control device is not working properly due to Plate is in place and works as
missing, out of place, or bent orifice plate. designed.
Obstructions Any trash, debris, sediment, or vegetation Plate is free of all obstructions and
blocking the plate. works as designed.
Overflow Pipe Obstructions Any trash or debris blocking (or having the Pipe is free of ali obstructions and
potential of blocking) the overflow pipe. works as designed.
Manhole See "Detention Tanks See "Detention Tanks and Vaults" Table No 3 See "Detention Tanks and Vaults"
and Vaults" Table No.3
2005 Surface Water Design Manual-Appendix A 1/24/2005
A-5
AI'I'I-"~[)IX A MAINTI-"NANn" REQIIIRFMENTS FI.OW CONTROL CONVEYANCE. AND WQ FACILITIES
NO.5 -CATCH BASINS
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is perlormed
General Trash & Debris Trash or debris of more than % cubic foot which No Trash or debris located
(Includes SedIment) is located immediately in front of the catch basin immedIately in front of catch basin
opening or is blocking capacity of the basin by openmg.
more than 10%.
Trash or debris (in the basin) that exceeds 1h the No trash or debris in the catch
depth from the bottom of basin to invert the basin.
lowest pipe into or out of the basin.
Trash or debris in any inlet or outlet pipe blocking Inlet and outlet pipes free of trash or
more tha n 11s of its height. debris.
Dead animals or vegetation that could generate No dead animals or vegetation
odors that could cause complaints or dangerous present within the catch basin.
gases (e.g., methane).
Deposits of garbage exceeding 1 cubic foot in No condition present which would
volume. attract or support the breeding of
insects or rodents.
Structure Damage to Corner of frame extends more than ~ inch past Frame is even with curb.
Frame andlor Top curb face into the street (If applicable).
Slab
Top slab has holes larger than 2 square inches Top slab is free of holes and cracks.
or cracks wider than y. inch (intent is to make
sure all material is running into basin).
Frame not sitting flush on top slab, i.e., Frame is sitting flush on top slab.
separation of more than ~ inch of the frame from
the top slab.
Cracks in BaSin Cracks wider than Y2 inch and longer than 3 feet, Basin replaced or repaired to design
Walls/Bottom any evidence of soil particles entering catch standards.
basin through cracks, or maintenance person
judges that structure is unsound.
Cracks wider than % inch and longer than 1 foot No cracks more than 1/4 inch wide at
at the joint of any inlet/outlet pipe or any the joint of inlet/outlet pipe.
evidence of soil particles entering catch basin
through cracks.
Settlement/ Basin has settled more than 1 inch or has rotated Basin replaced or repaired to design
Misalignment more than 2 inches out of alignment. standards.
Fire Hazard Presence of chemicals such as natural gas, oit No flammable chemicals present.
and gasoline.
Vegetation Vegetation growing across and blocking more No vegetation blocking opening to
than 10% of the basin opening. basin.
Vegetation growing in inlet/outlet pipe joints that No vegetation or root growth
is more than 6 inches tall and less than 6 inches present.
apart.
Pollution Nonflammable chemicals of more than 1'2 cubic No pollution present other than
fool per three feet of basin length. surface film.
Catch Basin Cover Cover Not in Place Cover is missing or only partially in place. Any Catch basin cover is closed
open catch basin requires maintenance.
Locking Mechanism Mechanism cannot be opened by on Mechanism opens with proper tools.
Not Working maintenance person with proper tools. Bolts into
frame have less than Y.z inch of thread.
Cover Difficult to One maintenance person cannot remove lid after Cover can be removed by one
Remove applying 80 Ibs. of lift; intent is keep cover from maintenance person.
sealing off access to maintenance.
Ladder Ladder Rungs Unsafe Ladder is unsafe due to missing rungs, Ladder meets design standards and
misalignment, rust, cracks, or sharp edges. allows maintenance person safe
access.
1/24/2005 2005 Surface \\/atcr Design Manual -Appendix A
A-6
APPENDIX A \1AINTENANCE R~,QLJ[REMENTS FOR FLOW COI\TROL CONVEYANCL AND WQ FACILlT[ES
NO.5 -CATCH BASINS
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is performed
Metal Grates Unsafe Grate Grate with opening wider than 71s inch. Grate opening meets design
([f App[icab[e) Opening standards
Trash and Debris Trash and debris that is blocking more than 20% Grate free of trash and debris.
of grate surface.
Damaged or Missing Grate missing or broken member(s) of the grate. Grate is in place and meets design
standards.
NO.6 -DEBRIS BARRIERS (E.G., TRASH RACKS)
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed.
General Trash and Debris Trash or debris that is plugging more than 20% Barrier clear to receive capacity
of the openings in the barrier. flow
Metal Damaged/Missing Bars are bent out of shape more than 3 inches. Bars in place with no bends more
Bars. than % inch
Bars are missing or entire barrier missing. Bars in place according to design.
Bars are loose and rust is causing 50% Repair or replace barrier to design
deterioration to any part of barrier. standards.
NO.7 -ENERGY DISSIPATERS
Mai ntenance Oefect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Periormed.
External:
Rock Pad Missing or Moved Only one layer of rock exists above native soil in Replace rocks to design standards.
Rock area five square feet or larger, or any exposure
of native soil.
Dispersion Trench Pipe Plugged with Accumulated sediment that exceeds 20% of the Pipe cleaned/flushed 50 that it
Sediment design depth. matches design.
Not Discharging Visual evidence of water discharging at Trench must be redesigned or
Water Properly concentrated points along trench (normal rebuilt to standards.
condition is a "sheet flow" of water along trench)
Intent is to prevent erosion damage.
Perforations Plugged. Over % of perforations in pipe are plugged with Clean or replace perforated pipe.
debris and sediment.
Water Flows Out Top Maintenance person observes water flowing out Facility must be rebuilt or
of "Distributor" Catch during any storm less than the design storm or redesigned to standards.
Basin. its causing or appears likely to cause damage.
Receiving Area Over-Water in receiving area is causing or has No danger of landslides.
Saturated potential of causing landslide problems.
Internal:
Manhole/Chamber Worn or Damaged Structure dissipating flow deteriorates to % or Replace structure to design
Post. Baffles, Side of original size or any concentrated worn spot standards.
Chamber exceeding one square foot which would make
structure unsound.
2005 Surface Water Design Manual-Appendix A 1124/2005
A-7
APPENDIX A MAIl\TFNANCE REQUIREMENTS FOR FLOW CO~TR()L COl\VEYANn:. ANil WQ F;\CILITIES
NO. 10 -CONVEYANCE PIPES AND DITCHES
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Pipes Sediment & Debris Accumulated sediment that exceeds 20% of the Pipe cleaned of all sediment and
diameter of the pipe. debns.
Vegetation Vegetation that reduces free movement afwater All vegetation removed so water
through pipes. flows freely through pipes.
Damaged Protective coating is damaged; rust is causing Pipe repaired or replaced.
more than 50% deterioration to any part of pipe.
Any dent that decreases the cross section area Pipe repaired or replaced.
of pipe by more than 20%.
Open Ditches Trash & Debris Trash and debris exceeds 1 cubic foot per 1,000 Trash and debris cleared from
square feet of ditch and slopes. ditches.
Sediment Accumulated sediment that exceeds 20% of the Ditch cleanedlflushed of all
design depth. sediment and debris so that it
matches design.
Vegetation Vegetation that reduces free movement of water Water flows freely through ditches.
through ditches
Erosion Damage to See "Detention Ponds" Table No.1 See "Detention Ponds" Table No.1
Slopes
Rock Lining Out of Maintenance person can see native soil beneath Replace rocks to design standards.
Place or Missing (If the rock lining.
Applicable).
NO. 11 -GROUNDS (LANDSCAPING)
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
General Weeds Weeds growing in more than 20% of the Weeds present in less than 5% of
(Nonpoisonous, not landscaped area (trees and shrubs only). the landscaped area.
noxious)
Safety Hazard Any presence of poison ivy or other poisonous No poisonous vegetation present in
vegetation. landscaped area.
Trash or Litter Paper, cans, bottles, totaling more than 1 cubic Area clear of litter.
foot within a landscaped area (trees and shrubs
only) of 1,000 square feet.
Trees and Shrubs Damaged Limbs or parts of trees or shrubs that are split or Trees and shrubs with less than 5%
broken which affect more than 25% of the total of total foliage with split or broken
foliage of the tree or shrub. limbs.
Trees or shrubs that have been blown down or Tree or shrub in place free of injury
knocked over.
Trees or shrubs which are not adequately Tree or shrub in place and
supported or are leaning over, causing exposure adequately supported; remove any
of the roots. dead or diseased trees.
2005 Surface \'-later Design Manual-Appendix A 112412005
A-9
APPENDIX A MAINTENANCE RI'()LlRI'MFN IS Fl.UW CONTROL. CONYF.YA,"CE. A,"IJ WQ FACILII II:S
NO. 12-ACCESS ROADS
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
General Trash and Debris Trash and debris exceeds 1 cubic foot per 1,000 Roadway free of debris which could
square feet (i.e., trash and debris would fill up damage tires.
one standards size garbage can).
Blocked Roadway Debns which could damage vehicle tires (glass Roadway free of debris which could
armetal). damage tires.
Any obstruction which reduces clearance above Roadway overhead clear to 14 feet
road surface to less than 14 feet. high.
Any obstruction restricting the access to a 10-to Obstruction removed to allow at
12-foot width for a distance of more than 12 feet least a 12-foot access.
or any point restricting access to less than a 10-
foot width.
Road Surface Settlement, Potholes, When any surface defect exceeds 6 inches in Road surface uniformly smooth with
Mush Spots, Ruts depth and 6 square feet in area. In general, any no evidence of settlement, potholes.
surface defect which hinders or prevents mush spots, or ruts.
maintenance access.
Vegetation in Road Weeds growing in the road surface that are more Road surface free of weeds taller
Surface than 6 inches tall and less than 6 inches tall and than 2 inches.
less than 6 inches apart within a 4DO-square foot
area
Modular Grid Build-up of sediment mildly contaminated with Removal of sediment and disposal
Pavement petroleum hydrocarbons. in keeping with Health Department
recommendations for mildly
contaminated soils or catch basin
sediments.
Shoulders and Erosion Damage Erosion within 1 foot of the roadway more than 8 Shoulder free of erosion and
Ditches inches wide and 6 inches deep. matching the surrounding road.
Weeds and Brush Weeds and brush exceed 18 inches in height or Weeds and brush cut to 2 inches in
hinder maintenance access. height or cleared in such a way as to
allow maintenance access.
112412005 2005 Surface Volater Design Manual-Appendix A
A-IO
APPENDIX A MAINTENANCE REQUIREMENTS FLOW COI':TROL. CONVI·:VANCE. AND WQ FACILITIES
NO. 24 -CATCH BASIN INSERT
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Catch Basin Inspection Inspection of media insert is required. Effluent water from media insert is
free of oils and has no visible sheen
Sediment When sediment forms a cap over the insert No sediment cap on the insert
Accumulation media of the insert and/or unit. media and its unit
Trash and Debris Trash and debris accumulates on insert unit Trash and debris removed from
Accumulation creating a blockage/restriction. insert unit. Runoff freely flows into
catch basin.
Media Insert Water Saturated Catch basin insert is saturated with water, which Remove and replace media insert
no longer has the capacity to absorb.
Oil Saturated Media oil saturated due to petroleum spill that Remove and replace media insert.
drains into catch basin.
Service Life Exceeded Regular interval replacement due to typical Remove and replace media at
average life of media insert product. regular intervals, depending on
insert product.
1/24/2005 2005 Surface Water Design Manual-Appendix A
A-20
APPENDIXE
Bond Quantity Worksheet
Declaration of Covenant
Facility Summary Sheet
Site Improvement Bond Quantity Worksheet 515 Web date: 02/22/2013
~ King County
Department of Permitting &. Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266
206-296-6600 TIY Relay 711
Project Name: Rosa Meadows
Location: 2724 Benson Road S, Renton, WA 98055
Clearing greater than or equal to 5,000 board feet of timber?
______ yes x no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1019
li-wk~-sbq.YI~
For alternate formats, call 206-296-6600.
Date: 2/12/2014
Project No.:
Activity No.:
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
Unit prices updated: 02/12/02
Version: 11/26/2008
R"port n"t .. : 2/1?l?n14
Site Improvement Bond Quantity Worksheet S15 Web date: 02/22/2013
Reference #
EROSION/SEDIMENT CONTROL Number
Backfill & compaction-embankment ESC-1
Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3
Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3)
Ditching ESC-4
Excavation-bulk ESC-5
Fence, silt ESC-6 SWDM 5.4.3.1
Fence, Temporary (NGPE) ESC-7
Hydroseeding ESC-8 SWDM5.4.2.4
Jute Mesh ESC-9 SWDM 5.4.2.2
Mulch, by hand, straw, 3" deep ESC-l0 SWDM 5.4.2.1
Mulch, by machine, straw, 2" deep ESC-II SWDM 5.4.2.1
Piping, temporary, CPP, 6" ESC-12
Piping, temporary, CPP, 8" ESC-13
Piping, temporary, CPP, 12" ESC-14
Plastic covering, 6mm thick, sandbagged ESC-15 SWDM 5.4.2.3
Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2)
Rock Construction Entrance, 50'x15'x1' ESC-17 SWDM 5.4.4.1
Rock Construction Entrance, 100'x15'x1' ESC-18 SWDM 5.4.4.1
Sediment pond riser assembly ESC-19 SWDM 5.4.5.2
Sediment trap, 5' high berm ESC-20 SWDM 5.4.5.1
Sed. trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1
Seedinq, by hand ESC-22 SWDM 5.4.2.4
Sodding, 1" deep, level ground ESC-23 SWDM 5.4.2.5
Sodding, 1" deep, sloped ground ESC-24 SWDM 5.4.2.5
TESC Supervisor ESC-25
Water truck, dust control ESC-26 SWDM 5.4.7
WRITE-IN-ITEMS •••• Isee Daae 9\
Page 2 019
li_\A/k-<::_sbq.vlc:.
Unit
Price Unit Quantity
$ 5.62 CY 6750
$ 67.51 Each 60
$ 85.45 CY 142
$ 8.08 CY 230
$ 1.50 CY 6500
$ 1.38 LF 1400
$ 1.38 LF
$ 0.59 SY 5500
$ 1.45 SY 400
$ 2.01 SY 400
$ 0.53 SY
$ 10.70 LF
$ 16.10 LF 100
$ 20.70 LF
$ 2.30 SY
$ 39.08 CY 25
$ 1,464.34 Each
$ 2,928.68 Each 1
$ 1,949.38 Each 1
$ 17.91 LF
$ 68.54 LF
$ 0.51 SY
$ 6.03 SY
$ 7.45 SY
$ 74.75 HR 120
$ 97.75 HR 120
Each
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
#Of
. Applicaliollll' Ca.t .
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
37935
4051
12134
1858
9750
1932
3245
580
804
1610
977
2929
1949
8970
11730
$ 100,453.96
$ 30,136.19
$ 130,590.15
A
I
Unit prices updated: 02/12102
Version: 11/26/2008
RopOr' n~to: 2/1 ?1?1l14
Site Improvement Bond Quantity Worksheet Web date: 12/0212008
Unit Price
GENERAL ITEMS No.
Backfill & Compactlon-embankment GI·l $ 5.62
Backfill & Compactlon-trench GI·2 $ 8.53
Clear/Remove Brush. by hand GI-3 $ 0,36
Clearing/Grubbing/Tree Removal GI-4 $ 8,876,16
Excavation -bulk GI-5 $ 1.50
Excavation -Trench GI-6 $ 4.06
Fencing, cedar, 6' high GI-7 $ 18.55
FencinQ, chain link, vin I coated, 6' high GI-8 $ 13.44
Fencing, chain link, gate, vinyl coated, 2 GI-9 $ 1,271.81
Fencing, split rail, 3' high GI-l0 $ 12.12
Fill & compact -common barrow GI-ll $ 22.57
Fill & compact -gravel base GI-12 $ 25.48
Fill & compact -screened topsoil GI-13 $ 37.85
Gabion, 12" deep, stone filled mesh GI-14 $ 54.31
Gabion, 18" deep, stone filled mesh GI-15 $ 74.85
Gabion, 36" deep, stone filled mesh GI-16 $ 132.48
Grading, fine, by hand GI-17 $ 2.02
Grading, fine, with grader GI-18 $ 0.95
Monuments, 3' lon~ GI-19 $ 135.13
Sensitive Areas Si n GI-20 $ 2.88
Sodding, 1"deep, sloped ground GI-21 $ 7.46
SurveYing, line & grade GI-22 $ 788.26
Surveying, lot locationllines GI-23 $ 1,556.64
Traffic control crew (2 flaggers) GI-24 $ 85.18
Trail, 4" chipped wood GI-25 $ 7.59
Trail, 4" crushed C"lnder GI-26 $ 8.33
Trail, 4" taD course GI·27 $ 8.19
Wall, retainj~ concrete GI-28 $ 44.16
Wall, rockery GI-29 $ 9.49
Page 3 of9 SUBTOTAL
"KCC 27A authorizes only one bond reduction.
li-wk.;:;-sbq.xle;,
Unit
CY
CY
SY
Acre
CY
CY
LF
LF
Each
LF
CY
CY
CY
SY
SY
SY
SY
SY
Each
Each
SY
Day
Acre
HR
SY
SY
SY
SF
SF
'.-'
Existing Future Public
Right-of-Way Right of Way
& Drainage Facilities
Quant. I Cost Quant. I Cost
500 2,810.00
0.35 3,106.66
500 750.00
6,666.66
Private Quantity Completed
Improvements (Bond Reduction)*
Quant.
6250
4.15
6000
450
1
250
21500
7
5
2.65
1200
Quant.
Cost Complete Cost
35,125.00
36,836.06
9,000.00
6,048.00
1,271.81
5,642.50
20,425,00
945.91
3,941.30
4,125.10
11,388,00
134,748.68
Unit prices updated: 02/12/02
Version: 11/26/08
Rep,..,rt n.:1te: 2/1 ?1?()14
Site Improvement Bond Quantity Worksheet Web date: 12/0212008
Unit Price
ROAD IMPROVEMENT No.
AC Grinding, 4' wide machine < 1000sy RI·1 $ 28.00
AC Grinding, 4' wide machine 1000-200 RI-2 $ 15.00
AC Gnndinq, 4' wide machine> 2000sv RI-3 $ 7.00
AC Removal/DisposalfRepair RI·4 $ 67.50
Barricade, type I RI·5 $ 30.03
Barricade, type III ( Permanent) RI-6 $ 45.05
Curb & Gutter, rolled RI-7 $ 17.00
Curb & Gutter, vertical RI-8 $ 12.50
Curb and Gutter, demolition and disposa RI-9 $ 18.00
Curb, extruded asphalt RI-10 $ 5.50
Curb. extruded concrete RI-11 $ 7.00
Sawcut, asphalt, 3" depth RI-12 $ 1.85
Sawcut, concrete, per 1" depth RI-13 $ 1.69
Sealant, asphalt RI-14 $ 1.25
Shoulder, AC. {see AC road unit price RI·15 $
Shoulder, gravel, 4" thick RI·16 $ 15.00
Sidewalk, 4" thick RI-17 $ 35.00
Sidewalk, 4" thick, demolition and dispos RI-18 $ 29.50
Sidewalk, 5" thick RI-19 $ 38.50
Sidewalk. 5" thick, demolition and dispos RI-20 $ 37.50
Sign, handica!'. RI· 21 $ 85,28
Striping, per stall RI·22 $ 5.82
Striping, thermoplastic, ( for crosswalk) RI-23 $ 2.38
Striping, 4" refleclonzed line RI-24 $ 0.25
Page 4 of 9 SUBTOTAL
~KCC 27 A authorizes only one bond reduction.
li_'Alko;;,_o;;,bq.xJo;;,
Unit
SY
SY
SY
SY
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
SY
SY
SY
SY
SY
SY
Each
Each
SF
~
Existing Future Public
Right-of-way Right of Way
& Drainage Facilities
Quant. Cost Quant. Cost
150 4.200.00
150 10,125.00
600 7,500.00
600 1,110.00
600 750.00
350 12,250.00
--L-________ -40 10.00
35.945.00
Privata Bond Reduction*
Improvements
Quant.
1100
600
800
550
Quant.
Cost Complete Cost
13,750.00
21,000.00
1,904.00
137.50
36,791.50
Unit prices updated: 02/12/02
Version: 11/26/08
Rep ...... rt n"'te: 2 /1 ')1')014
Site Improvement Bond Quantity Worksheet Web date: 12/0212008
Unit Price Unit
ROAD SURFACING (4" Rock = 2.5 base & 1.5" top course)
For KeRS '93, (additional 2.5" base) add RS-1 $ 3.60
AC Overlay, 1.5" AC RS - 2 $ 11.25
AC Overlay, 2" AC RS - 3 $ 15.00
AC Road, 2", 4" rock, First 2500 SY RS-4 $ 21.00
AC Road, 2", 4" rock, Oty. over 2500SY RS - 5 $ 19.00
AC Road, 3", 4" rock, First 2500 SY RS-6 $ 23.30
AC Road, 3", 4" rock, Oty. over 2500 SY RS -7 $ 21.00
AC Road. 5", First 2500 SY RS - 8 $ 27.60
AC Road, 5", Oty. Over 2500 SY RS - 9 $ 25.00
AC Road, 6", First 2500 SY S-I $ 33.10
AC Road, 6", Oty. Over 2500 SY S -11 $ 30.00
Asphalt Treated Base, 4" thick S-I $ 20.00
Gravel Road, 4" rock, First 2500 SY RS-I $ 15.00
Gravel Road, 4" rock, Qty. over 2500 SY RS-I $ 8.50
pee Road, 5", no base, over 2500 SY RS-I $ 27.00
pee Road, 6", no base, over 2500 SY RS-' $ 25.50
Thickened Edge S-I $ 8.60
Page 5 of9 SUBTOTAL
*KCC 27 A authorizes only one bond reduction.
li_wk"~_sbq.xlc;:
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
LF
Existing Future Public
Right-ot-way Right of Way
& Drainage Facilities
Quant. Cost Quant. Gost
For '93 KeRS (6.5" Rock= 5" base & 1.5" top course)
500 11.650.00
11 ,650.00
Private Bond Reduction'"
Improvements
Quant.
2500
Quant.
Cost Complete Cost
58.250.00
58,250.00
Unit prices updated: 02/12/02
Version: 11/26/08
Rep .... rt no::ate: 2 /1 ?/?n14
Site Improvement Bond Quantity Worksheet Web date. 12102f2008
Unit Price Unit
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent)
Access Road, RID D-ll $ 21.00
Bollards ~ fixed D -21 $ 240.74
Bollards -removable D -31 $ 452.34
* (CBs include frame and lid)
CB Type I D-4 $ 1,257.64
CB Type IL D-5 $ 1,433.59
CB Type II, 48" diameter D-6 $ 2,033.57
for additional depth over 4' D-7 $ 436.52
CB Type II, 54" diameter D-8 $ 2,192.54
for additional depth over 4' D-9 $ 486.53
CB Type II, 60" diameter D-10 $ 2,351.52
for additional depth over 4' D-11 $ 536.54
CB Type II, 72" diameter D-12 $ 3,212.64
for additional depth over 4' D -13 $ 692.21
Through-curb Inlet Framework. (Add) D -14 $ 366.09
Cleanout, PVC, 4" D -15 $ 130.55
Cleanout, PVC, 6" D -16 $ 174.90
Cleanout, PVC, 8" D -17 $ 224.19
Culvert, PVC. 4" D -18 $ 8.64
Culvert, PVC, 6" D -19 $ 12.60
Culvert, PVC, 8" D -20 $ 13.33
Culvert, PVC, 12" D-21 $ 21.77
Culvert, eMP, 8" D -22 $ 17.25
Culvert, eM?, 12" D -23 $ 26.45
Culvert, CMP, 15" D -24 $ 32.73
Culvert, eMP, 18" D -25 $ 37.74
Culvert, eMP, 24" D -26 $ 53.33
Culvert, CMP, 30" D -27 $ 71.45
Culvert, eMP, 36" D -28 $ 112.11
Culvert, CM?, 48" D -29 $ 140.83
Culvert, CMP, 60" D -30 $ 235.45
g~v_~~gMP, 72" D -31 $ 302.58
Page6of9 SUBTOTAL
*KCC 27A authorizes only one bond reduction.
li-wkc:;-sbq.xlc:;
SY I
Each 1
Each 1
Each
Each
Each
FT
Each
FT
Each
FT
Each
FT
Each
Each
Each
Each
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
Quant.
Existing Future Public Private Bond Reduction·
Right-of-way Right of Way Improvements
& Drainage Facilities Quant
Cost Quant. Cost Quant. Cost Complete Cost
For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.
I I
1 I
1 I
3 3,772.92
5 10,167.85
-
13.940.77
3501
1
41
6
4
1
20
3
7.350.00
1,809.36
7.545.84
8.134.28
2.351.52
3.498.00
672.57
31,361.57
Unit prices updated: 02/12/02
Version: 11126/08
Repnrt n~te: 2 /1 ')1')014
Site Improvement Bond Quantity Worksheet Web date" 12/02/2008
DRAINAGE CONTINUED
No. Unit Price
Culvert, Concrete, 8" 0-32 $ 21.02
Culvert, Concrete. 12" 0-33 $ 30.05
Culvert, Concrete, 15" 0-34 $ 37.34
Culvert, Concrete, 18" 0-35 $ 44.51
Culvert, Concrete, 24" 0-36 $ 61.07
Culvert, Concrete, 30" 0-37 $ 104.18
Culvert, Concrete, 36" 0-38 $ 137.63
Culvert, Concrete, 42" 0-39 $ 158.42
Culvert, Concrete, 48" 0-40 $ 175.94
Culvert, CPP, 6" 0-41 $ 10.70
Culvert, CPP, 8" 0-42 $ 16.10
Culvert, CPP, 12" 0-43 $ 20.70
Culvert, CPP, 15" 0-44 $ 23.00
Culvert, CPP, 18" 0-45 $ 27.60
Culvert, CPP, 24" 0-46 $ 36.80
Culvert, CPP, 30" 0-47 $ 48.30
Culvert CPP, 36" 0-48 $ 55.20
Ditching 0-49 $ 8.08
Flow Dispersal Trench (1,436 base+) 0-50 $ 25.99
French Drain (3' depth) 0-51 $ 22.60
Geotextile, laid in trench, polvpropylene 0-52 $ 2.40
Infiltration pond testinQ 0-53 $ 74.75
Mid-tank Access Riser, 48" dia, 6' deep 0-54 $ 1,605.40
Pond Overflow Spillway 0-55 $ 14.01
Restrictor/OIl Separator, 12" 0-56 $ 1,045.19
Restnctor/Oil Separator, 15" 0-57 $ 1,095.56
Restrictor/Oil Separator, 18" 0-58 $ 1,146.16
Riprap, placed 0-59 $ 39.08
Tank End Reducer (36" diameter) 0-60 $ 1,000.50
Trash Rack, 12" 0-61 $ 211.97
Trash Rack, 15" 0-62 $ 237.27
Trash Rack, 18" 0-63 $ 268.89
Trash Rack, 21" 0-64 $ 306.84
Page 7 of9 SUBTOTAL
*KCC 27 A authorizes only one bond reduction.
II-wks-sbq.xl~
Unit
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
CY
LF
LF
SY
HR
Each
SY
Each
Each
Each
CY
Each
Each
Each
Each
Each
Existing Future Public
Right-of-way Right otWay
& Drainage Facilities
Quant Cost Quant. Cost
280 5796
165 4554
10350
Private Bond Reduction*
Improvements
Quant.
Quant. Cost Complete Cost
700 14490
240 6624
93 3422.4
20 280.2
1 211,97
1 268.89
_L---. -
25297.46
Unit prices updated: 02/12/02
Version: 11/26/08
Report n:=ite: 2J1'J'014
Site Improvement Bond Quantity Worksheet Web date: 12/0212008
Unit Price Unit
PARKING LOT SURFACING
No.
2" AC, 2" top course rock & 4" borrow PL-t $ 21.00 SY
2" AC, 1.5" top course & 2.5" base caur PL - 2 $ 2S.00 SY
4" select borrow PL - 3 $ 4.55 SY
1.5" top course rock & 2.5" base course PL - 4 $ 11.41 SY
UTILITY POLES & STREET LIGHTING
Utilitv Pole(s) Relocation I UP-1 Lump Sum
Street Liqht Poles w/Luminaires UP-2 Each
WRITE-IN-ITEMS
(Such as detentionlwater quality vaUlts.) No.
WI-1 Each
WI-2 SY
WI-3 CY
WI-4 LF
WI-5 FT
WI-6
WI-7
WI-S
WI-9
WI-l0
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):
30% CONTtNGENCY & MOBILIZATION:
Page 8 of9
'"Kec 27 A authorizes only one bond reduction.
li-wkc:-c:bq.xl<::.
GRANDTOTAL:
COLUMN:
Existing Future Public Private Bond Reduction*
Right~of-way Right of Way Improvements
& Drain~ Facilities Quant.
Quant. Price Quant. Cost Quant. Cost Com lete Cost
Utility pole relocation costs must be accompanied by Franchise Utility's Cost Statement
1
15
78,552.43
23,565.73
102,118.15
B C
...l
-
286,449.21
85.934.76
372.383.97
D E
Unit prices updated: 02112/02
Version: 11/26/08
Repnrt (")~te: 2 /1 ')",n14
Site Improvement Bond Quantity Worksheet Web date: 12/02/2008
Original bond computations prepared by:
Name: Brianne Gastfield Date: 2/11/2014
PE Registration Number: Tel. #: 253-838.0 113
Firm Name: ESM Consulting Engineers, LLC
Address: 33400 8th Ave S, Suite 205, Federal Way, WA 98003 Project No:
ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REOUIREMENTS
Stabilization/Erosion Sediment Control (ESC)
Existing Right-ot-Way Improvements
Future Public Right 01 Way & Drainage Facilities
Private Improvements
Calculated Quantity Completed
(A)
(B)
(C)
(D)
PERFORMANCE BOND'
AMOUNT
--1 130,590.1
$
$ 102,118.2
$ 372,384.0
Total Right-olWay and/or Site Restoration Bond'r I (A+B) $ 130,590.1
(First $7,500 of bond'" shall be cash.)
Performance Bond' Amount (A+B+C+D) = TOTAL (T) 605,092.3
Minimum" bond* amount IS $2000.
Reduced Performance Bond* Total ***
Maintenance/Delect Bond' Total
NAME OF PERSON PREPARING BOND' REDUCTION:
BOND' AMOUNT
REQUIRED AT RECORDING OR
TEMPORARY OCCUPANCY'"
(E) $
TxO.30 $ 181,527.7 OR
(T-E) $ 605,092.3
Use larger of Tx30 % or (T-E)
Date:
* NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County.
** NOTE: KeC 27A authorizes right of way and site restoration bonds to be combined when both are required.
PUBLIC ROAD & DRAINAGE
MAINTENANCE/DEFECT BOND'
(B+C) x
0.25 = $ 25,529.5
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on-and off-site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
*** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
I I
REQUIRED BOND' AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY DDES
Page 9 019
Check out the DDES Web site at www.kingcountv.govlpermits
li-wks-sbq_xls
Unit prices updated: 02/12/02
Version: 11/26/08
RApor! n~tA: 2/1 ?I?014
RECORDING REQUESTED BY AND
WHEN RECORDED MAIL TO:
DECLARATION OF COVENANT
FOR INSPECTION AND MAINTENANCE OF STORMW ATER
FACILITIES AND BMPS
Grantor: _____________ _
Grantee: King County
Legal Description: ___________________________ _
Additional Legal(s) on: __________________________ _
Assessor's Tax Parcel ID#: ________________________ _
IN CONSIDERATION of the approved King County ___________ pennit
for application No. _________ relating to the real property ("Property") described
above, the Grantor(s), the owner(s) in fcc of that Property, hereby covenants(eovenant) with King
County, a political subdivision of thc statc of Washington and its municipal successors in interest and
assigns ("King County" and "the County", or "its municipal successor"), that he/she(they) will observe,
consent to, and abide by the conditions and obligations sct forth and described in Paragraphs J through J 0
Fom1 Revised 12112106
below with regard to the Property, and hereby grants(grant) an easement as described in Paragraphs 2 and
3. Grantor(s) hereby grants(grant), covenants(covenant), and agrees(agree) as follows:
1. The Grantor(s) or hislhcr(thcir) succcssors in intcrcst and assigns ("Owners") shall at their
own cost, operate, maintain, and keep in good repair, the Property's stonnwater facilities and best
management practices ("EMPs") identified in the plans and specifications submitted to King County for
the review and approval of pennit(s) #: _____________ . Stonnwater facilities
include pipes, swales, tanks, vaults, ponds, and other engineered structures designed to manage
stonnwater on the Property. Stonnwatcr EMPs include dispersion and infiltration devices, native
vegctated areas, penneable pavements, vegetated roofs, rainwater harvesting systems, reduced impervious
surface coverage, and other measures designed to reduce the amount of stonnwatcr runoff on the
Property.
2. King County shall have the right to ingress and egress over those portions of the Property
necessary to perform inspections of the stonnwater facilities and EMPs and conduct other activities
specificd in this Dcclaration of Covenant and in accordance with King County Code ("KCC") 9.04.120 or
rclevant municipal successor's codes as applicable. This right of ingress and egress, right to inspect, and
right to perfonn required maintenancc or rcpair as provided for in Section 3 below, shall not extend over
those portions of the Property shown in Exhibit "A,"
3. If King County detennines that maintenance or repair work is required to be done to any of the
stonnwater facilities or EMPs, the Director of the Water and Land Resources Division or its municipal
successor in interest ("WLR") shall give notice of the specific maintenance andlor repair work required
pursuant to KCC 9.04.120 or relevant municipal successor's codes as applicable. The Director shall also
set a reasonable time in which such work is to be completed by the Owners, Ifthe above required
maintenance or repair is not completed within the time set by the Director, the County may pcrfonn the
required maintenance or repair, and hereby is given access to the Property, subject to the exclusion in
Paragraph 2 above, for such purposes. Written notice will be sent to the Owners stating the County's
intention to perform such work. This work will not commence until at least seven (7) days after such
Form Revised 121]2/06 2
notice is mailed. If, within the sole discretion of the WLR Director, there exists an imminent or present
danger, the seven (7) day not icc period will be waived and maintenance andlor repair work will begin
immediately.
4. If at any time King County reasonably determines that a stormwatcr facility or BMP on the
Property creates any of the hazardous conditions listed in KCC 9.04.130 or relevant municipal successor's
codcs as applicable and herein incorporated by reference, the WLR Director or equivalent municipal
successors official may take measures specified therein.
5. The Owners shall assume all responsibility for the cost of any maintenance or repair work
completed by the County as described in Paragraph 3 or any measures taken by the County to address
hazardous conditions as described in Paragraph 4. Such responsibility shall include reimbursement to the
County within thirty (30) days of the receipt of the invoice for any such work performed. Overdue
payments will require payment of interest at the current legal rate as liquidated damages. Iflegal action
ensues, the prevailing party is entitled to costs or fees.
6. The Owners are hereby required to obtain written approval from the King County WLR
Director prior to filling, piping, cutting, or removing vegetation (except in routine landscape
maintenance) in open vegetated stormwater facilities (such as swales, channels, ditches, ponds, etc.), or
performing any alterations or modifications to the stormwater facilities and BMPs referenced in this
Declaration of Covenant.
7. Any notice or consent rcquired to be given or otherwise provided for by the provisions of this
Agreement shall be effective upon personal delivery, or three (3) days after mailing by Certified Mail,
return receipt requested.
S. With regard to the matters addressed herein, this agreement constitutes the entire agreement
between the parties, and supersedes all prior discussions, negotiations, and all agreements whatsoever
whether oral or written.
9. This Declaration of Covenant is intended to protect the value and desirability of the real
property described above, and shan inure to the benefit of all the citizens of King County and its
Form Revised 12/12/06 3
municipal successors and assigns. This Declaration of Covenant shall run with the land and be binding
upon Grantor(s), and Grantor's(s') successors in interest, and assigns.
10. This Declaration of Covenant may be terminated by execution of a written agreement by the
Owners and King County or the municipal successor that is recorded by King County in its real property
records.
Form Revised 12112/06 4
IN WITNESS WHEREOF, this Declaration of Covenant for the Inspection and Maintenance of
Storrnwater Facilities and BMPs is executed this __ day of _________ , 20
STATE OF WASHINGTON
COUNTY OF KING )ss,
On this day personally appeared before me:
GRANTOR, owner of the Property
GRANTOR, owner of the Property
_________ ---,-__ --:-_---,-____ ' to me known to be the individual(s) described in
and who executed the within and foregoing instrument and acknowledged that they signed the same as
their free and voluntary act and deed, for the uses and purposes therein stated.
Given under my hand and official seal this __ day of _________ , 20 __ ,
Fonn Revised 12/12/06
Printed name
Notary Public in and for the State of Washington,
residing at
My appointment expires _________ _
KINe; COUNTY, WASHINGTOJ\, SURFACE WATER DESIG~ MANUAL
STORMWATER FACILITY SUMMARY SHEET DOES Pennit
Number -----------
(provide one Stormwater Facility Summary Sheet per Natural Discharge Location)
Overview:
Project Name
____ L_a_R_o_s_a _____________________ Date 2014-04-15
Downstream Drainage Basins
Major Basin Name Duwamish -Green River
Immediate Basin Name _B_l_a_c_k_R_l_v_e_r _____ _
Flow Control:
LaRosa Pond Flow Control Facility NamelNumber _______________ _
Facility NW corner of the overall site
Location ___ __
Ifnone,
Flow control provided in regional/shared facility (give
location ) __ --:-_--:---=-_____ ----==--_---:-
No flow control required Exemption number
General Facility Information:
TypelNumber of detention facilities: TypelNumber of infiltration facilities:
__ 1_ ponds ___ ponds
vaults tanks
tanks trenches
Control Structure Location
West side of Pond
Type of Control Structure _______ 6_._0_0_f_t_. ____ Number of Orifices/Restrictions
3
Size of Orifice/Restriction: No.1 2.50
No,2 1.75 in.
No.3 7.00 in. (weir)
No,4
in.
Flow Control Perfonnance Standard Flow Control Duration Standard (Forested)
2009 Surface Water Design Manual 1/9/2009
KI;-JG COU;-JTY, WASHII'GTON, SURFACE WATER DESIGN MANUAL
Live Storage Volume _3_8_,_9_0_6_C_f_, __
5,3%
Depth
Number of Acres Served ----c-c7_,_1_0 __ a_c __
21 Number of Lots ________ _
6,00 ft,
Dam Safety Regulations (Washington State Department of Ecology)
Reservoir Volume above natural grade ______ _
Depth of Reservoir above natural grade ______ _
Facility Summary Sheet Sketch
_ Volume Factor of Safety
All detention, infiltration and water quality facilities must include a detailed sketch,
(II "x 17" reduced size plan sheets may be used)
2009 Surface Water Design Manual
2
1/9/2009
KING COUNTY, WASIIINGTON, SURfACE WATER ])ESIGN MANUAL
Water Quality:
Type/Number of water quality facilities/BMPs:
biofiltration swale
(regular/wet! or continuous inflow)
large)
___ combined detention/wetpond
large)
___ sand filter (basic or large)
___ sand filter, linear (basic or
___ sand filter vault (basic or
(wetpond portion basic or large)
combined detention/wetvault
___ filter strip
sand bed depth ___ (inches)
above
___ flow dispersion
___ farm management plan
___ landscape management plan
___ oil/water separator
(baffle or coalescing plate)
Liner? ________ _
x catch basin inserts:
Manufacturer Contech
___ pre-settling pond
___ pre-settling structure:
stormwater wetland
x storm filter
___ wetpond (basic or large)
wetvault
___ Is facility Lined?
If so, what marker is used
Manufacturer ___________________ _
__ x_ high flow bypass structure (e.g., flow-splitter catch basin)
source controls
Design Information
Water Quality design flow __ O_,_3_2_C_f_s ________ _
Water Quality treated volume (sandfilter) ________ _
Water Quality storage volume (wetpool) _______ _
Facility Summary Sheet Sketch
2009 Surface Water Design Manual
3
119/2009
KI"G COU"TY, WASHINGTON. SURFACE WATER DESIGN MANUAL
All detention, infiltration and water quality facilities must include a detailed sketch.
(11 "x 17" reduced size plan sheets may be used)
2009 Surface Water Design Manual
4
1/9/2009
!1l
If) o
II
!1l
...J
\
/
~6"" ~~El 'PEr
;~ S C
I" :-'HfET
(j;' ~~E L~'r'(/I"tt ~~E[T
,At~~_~._
Cd 2. Workhg 011)'11 Be!of" VO'J og
811
lIIibe!1U~L..o¢atlonCenier
lDM!ND.oR.WA)
A PORTION OF THE NW 1/4 OF SECTION 29, TWP, 23 N •• RGE. 5 E, KING COUNTY, WA
STOR'-4FllTER ~HOL£
~J-1 1091 21 " 11~~~3;';g~I~~gSHEET_ ~'I-O~ i r~:i~~~~~ H~'S
I F~I.CE Set i / r-EMEf:>:::[I.\,
, O"j SHEET I I ,(N[FFLO~, I"I.S. I / i \ / / [_~V=4/ j(l
I I 6' ~O·.O 2[11(-/ I i I I~~=-J. /--r-~-,-.-.I~~~==~d~--'~'.~:~'C '"" i= I
yV'1 . ----3-1' PONO OUTlIT: W(TRAsH RACK -. ~~. \ C I' /f' Y·.;:;.:.; :-~1:ll~62'!~~1;'? ---:~=:.~~ ~
;' I Iii -!-Cd 'epee:, -no 5 S"[[_' -----;-_ \ \ \ I r--I:
if: i ...--J----.~,-TRACT A ~,--_" '., \ t-
iL I(). r.:,:-:-:-:-:-:-~(.S~~~~ ,~~:":I~.'~?~) .. ;-........ t.' ~'1.,' -h' Il·\t \ '. '. . I J I· ei1l ~''-." : ---'-,4110. ~;/." . 1POND INLET. '.~ ~FASI-~AC.' J"'.. '-'1_ 1 (~L D9 -6
// ~~r'ig~~~I~?\HI~ s",' I
: / -,' I I 'fl/\:
• -:'-~rll Lf, 2~'(" '0-'/, /1 , /~ 1-~:~~:~:~J~ :-~4~"< ~ l
/ ....
"/ , /<,/
' .... >( ". ~ ~/ ',-'~ ~F'='~'3"·~
JA ' ':j , 71
~;~(~;CJG~~fHED
POND ACCESS ROAD ANTI-SEEPAGE COLLAR DETAIL
rlOTTCSCAL[
II \
I
I
~
I
I
2
L-~
21
"
n
SCALE: 1" _ 20'
2~~-410
440
430
425
420
415
410
l' LF. 18"~
:Ql :>~2 0",%
1+00 1+40
POND VOLUMES
RfQlJlf.'~ I)
435
430
425
420
415
410
3+00
1+80
Lf.
5-0
:=Jl~
SEE 51:[-")-0
Ev STIIIG GRC')~JD-
3+40 3+60 4+20
POND CROSS SECTION B-B
SCALE: :::{
2+20 2+60 3+00
SCALE: ~::~c' ~~:~.L
i.:.l-t~_~, __ ,_ CHE.CKED F,)P '::)I,M"lIAtrU
Ce112WortmgD&ytiBeloreVouDg
4+50
4+00
38.9DE 0-811
""""''lie
'""«""AJW
DA~E I AI'I'"
1--20' ",~1:~; ':"~";'';''/~ ,"
~'
\ CATUM'\
"
!R CITY
F'EII
f"IQ~r ~S/B~lId ,,,:Pvbr;, D"~I
l.Utiea1k\der~ndLocaIlortCenter
(CJIT,NO,OR,WA)
LaRosa
POND A PLAN, CROSS SECTIONS & DETAILS
415
410
440
405
430
425
420
415
410
APPENDIX F
Storm Filter Manhole and Stormgate
Calculations and Worksheets
C~'~NTECH'
ENGINEERED SOLUTIONS
CONTECH Stormwater Solutions Inc. Engineer:
Date
Site Information
Project Name
Project State
Project Location
Drainage Area, Ad
Impervious Area, Ai
Pervious Area, Ap
% Impervious
Runoff Coefficient, Rc
Upstream Detention System
Peak release rate from detention, Orelease peak
Treatment release rate from detention, Qreleasetreat
Detention pretreatment credit
(from removal efficiency calcs)
Mass loading calculations
Mean Annual Rainfall, P
Agency required % removal
Percent Runoff Capture
Mean Annual Runoff,V,
Event Mean Concentration of Pollutant, EMC
Annual Mass Load, M'o'al
Filter System
Filtration brand
Cartridge height
Specific Flow Rate
Number of cartridges· mass loading
Mass removed by pretreatment system, Mpre
Mass load to filters after pretreatment, Mpa551
Estimate the required filter efficiency, E"e,
Mass to be captured by filters, Mfilte ,
Allowable Cartridge Flow rate, O,art
Mass load per cartridge, M,art (Ibs)
Number of Cartridges required, Nmass
T reatm ent Ca pacity
Determine Critical Sizing Value
Number of Cartridges using Qrelease treat, Nflow
Method to Use:
SUMMARY
Treatment Flow Rate, cfs
Cartridge Flow Rate, gpm
Number of Cartridges
Determining Number of
Cartridges for Systems
Downstream of Detention
EJJ
4/10/2014
Rosa Meadows
Washington
Renton
7.10 ac
3.98 ac
3.12
56%
0.55
1.17 cfs
0.32 cfs
50%
38 in
80%
90%
488,763 ft3
70 mgtl
2134.58 Ibs
Storm Filter
27 in
1.00 gpmlft"
1067.29 Ibs
1067.291bs
0.60
640.37Ibs
11.25
54.00Ibs
12
0.30 cfs
13
HYDRAULIC
0.32
11.3
13
1 of 1
C(>NTECH"
ENGINEERED SOLUTIONS
StormGate Hydraulic
Calculations
Prepared by Eli Jefferson April 11, 2014 Pre parer Initials AS
Project Name:
Structure 10:
Site Flow Rates
Treatment Flow, Qtreat
Peak Flow, Qpeak
StormGate Size
System Type
Manhole Diameter
Weir Wall Length, Lwall
Weir Length, Lwe1r
Storm Gate Hydraulic Calculations
StormGate System Info:
Invert In Elevation, IE In
Invert In Pipe Diameter
Low Flow Invert Out Elev, OutLOw
Low Flow Pipe Diameter, DLQW
Low Flow Orifice Diameter, Do
Orifice Type
Area of Orifice, Ao
Invert Out Elevation, IE Out
Invert Out Pipe Diameter
Low Flow through Orifice
StormGate Weir Elev
Rosa Meadows
201
0.32 cfs Provided by the Engineer
7.90 cfs Provided by the Engineer
Manhole
4.00 It
4.00 It
3.00 It
=Manhole Diameter
Length of StormGate adjustable weir
420.20 It Provided by the Engineer
18 in Provided by the Engineer
420.20 It Provided by the Engineer
8 in Provided by the Engineer
r---;'57in'-'lselected by CONTECH Stormwater Solutions
plate Selected by CONTECH Stormwater Solutions
0.14 sf =Pi' Do'/4
420.20 It Provided by the Engineer
18 in Provided by the Engineer
0.32 cis =0.61·Ao·(2·g·(Weir Elev -(OutLow +Do/24)))'"
420.64 It
420.64 hidden, to round to nearest 100th
Check Weir Elev ::> Top of Orifice OK
StormGate During Peak Flow:
WSE downstream, WSEd-peak
Is SG Weir Elev < WSEd-peak :
Weir Coefficient, C
Qpeak
Headloss over Weir, H
Upstream WSE in SG at Qpeak
Flow through Orifice @ Peak
No.of Flowspreaders in StormFilter
Check Flow through Orifice
Additional Storm Gate Elevations:
Rim Elevation
Floor
Top of Weir Wall
Total depth
Top of Pipe Elevation
Check if Surcharged Conditions
OK
0.00 It
3.33
7.90 cfs
0.81 It
Assuming Free Discharge
Check for submerged weir conditions
=(C·Lw .. :H")+(C·(L..,,-L..,,)'(H-6/12)")
,--,4!!2:..:1.::.4:::S"It,,--,I-SG Weir Elev + H
0.68 cfs
1
OK
425.00 It
418.97 It
421.14 It
6.03 It
421.70 It
OK
=0.61·A'(2·g·(WSEpeak -(Out,=+Do/24)))"2
=Check that Flow through Orifice @ Peak
< 1.BOcfs * No. of Flowspreaders
Provided by the Engineer
=Lower of (StormGate Weir Elev -20") or IE Out
=StormGate Weir Elev + 6"
=Rim -Floor
=IE In + Pipe Diameter
If Pipe is surcharged, Engr to confirm design
12021-8 NE Airport Way
Portland, OR 97220 ©2006 CONTECH Stormwater Solutions
contechstormwater.com Phone: 800-548-4667 Fax: 503-258-3190 1 of 1