Loading...
HomeMy WebLinkAboutR-4100620 CD T qqd- 1 O r) W IFFIFIF 1. CONTRACTOR PS PRIOR TO CONREDUCTTRUCK EiallP PER SHIFT ESTATE TEMPORARY TRAFFIC ANNE. 3 I DECIDED. TRAFFIC SAFETY CO NES AT NIGHT. 4ASEAN EXISTING PAVEMENT 5 EXCAVATE ROADWAY IN WORK YORE6 INSTALL . TRIMAGE AMC ADDDU p EU PAS. IDRIM ADDO . PEACE CRUSHED SURFACING TOP WORSEi 9. INSTAD.CONCBETF SmEWALK ANN CONCRER CURB END (HOSPITALS. ]B. HMA ROAD AMID SKY LIN ES. 1. REMOVE TEMPORARY TRAFFIC SIGNS AND TRAFFIC CAEEES CON ES, 1, INSTALL TOM PORGARRY TRAFFIC SIGNS 2INFREAUT TRAFFIC SAFETY CONES AT NIGER 3, SAARCUT ABOUT MG EXPIRES ME 4 EXCAVAIT ROADWAY IN WORK WIN F, REMOVE EXISTUNG DRARELAW AND STRUCTURES 6, INSTALL GRIFFIN AN RUMINATIONS AN A UNDEPHROU AN GERALD ADD WAVES, 7, TRIM AND AS PLACE CIRCULAR) SURNMONG TOP SEXUAL 9, INSTALL CONCRETE SIDEARALK AND CONCRETE CURB ANDISUFFICTRALL 10, HMA ROAD AND BIKE ONES, 1. INSTATHEAWFURRY TRAFFIC SIGNS. ALL 3, INSTATE TRAFFIC GINC SAFETY COMARGARMES AT NIGHT 0. EXCAVATE ROADWAY IN WORK DOES, C INSTALL D TEXT WATERMAN AND HYDRAINI ABANDON NOR REMOVE EXISTING WATERMAIN AND HYDREANI T INSTALL DRAINAGE AND STRUCTURES ABANDON OR EEu4HTING FOUNDATIONSXIS71NG DRAINAGE END STRUCTURESE INSTALL UNDATIONS AND UNDERGROUND 9 DORI FORMWORK FOR PROPOSED WALUT 10INSTALL UNDERGROUND CIANDURT AND FORMER TOMMY VALUES 12, MACAND CLOSINGS SURFACING TOPWORSE, i.'uineauo NCRETEi DEWAEX, WANTS, AND OFFERED 14. HIM ROAD AMID INKE FARES 15, REMOVE RMPoPAPY TRAFFIC SIGNS AND TRAFFIC SAFEYCONO REVISED TO CONFORM WITH CONSTRUCTION RECORDS ENT IDEMVOwar TnPFNC NGNs. i INSTALL TRAFFIC SAFETY CONES AT NIGHT_ ISTING SPEANAGENT 4 EXCAVATE ROADWAY N WORK EDGE. 5. TOLD ANCOMPETE GDE 6 4 9CE CRUD SUDFACI 4CATOV COURSE. IT RREMVC TEMPORARY M ORAARYf R'A SAC SIGNS AND TRAFFIC NOTE TO CONTRACTOR: CONSTRUCTION SEQUENCING DESCRIBED APPLIES TO THE WORZONES OUTLINED IN THIS TEMPORARY TRAFFIC CONTROL SET AND IS NOT REQUIRED TO BE FOLLOWED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE FINAL WORKZONES, TEMPORARY TRAFFIC CONTROL, AND CONSTRUCTION SEQUENCING PRIOR TO ANY CONSTRUCTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE WORKZONES, TEMPORARY TRAFFIC CONTROL, AND CONSTRUCTION SEQUENCING WITH THE CITY PRIOR TO ANY CONSTRUCTION. R-410062 FEAR ACN, 9 CITY OF RENT ON ouvau AVE NE o To =�. RECORD xW,Dwxw,,.N„�Dx Iwx I'"'""" Y' �— DRAWINGS TEM ROSARY TRAFFIC CONTROL CO N$TRV CTION $EQVENCING NTNY a� xumxex xrviwxwwlrrox N w onrt ��.,.... rFe w��NTrzNs� oert $HEETI OFB °T