HomeMy WebLinkAboutT-410007As
4 u r °I Ifr
,,,,�
BITS I d �BB*W BEBW
x DUVALLAVENUE HE 1—
L44d1 T�
SEW
SRI
91
PLAN
GENERAL NOTES:
L CONSIOULITY OF
THE STRUCTION SHARED
nWHBMCTSE GRAPHBEPROMPT
u PTOTHTH XNTOx LITTLE ENGNEER FORPROPOSED UTILITY
AGREESL ALL VAULTS
FNRµAND LOCATIONS
CONDDUTXEAT BE INSTALLED AT
\`� _. --_ Z THE
CTICN SHOWN APES HCMAnc CONTRACTOR
LLL z ---- _ _ sH
' -�-- mRR FORT V UVIDAND
ELEVATORS WITH FILE ENGINEER FLUOR
THE
' 3. UNAnIXISANDTRIENNSRDEKOD0PDINATED
.IA)OCR
WITH PSEJPIOR TO CONSTRUCTION,
W ALLPC 0 B 4, CONTRACTOR IS RESPONSIBLE FOR CORWATOTRENCHING INSTALLATION AN D SACKFI LL OF SE
ITS
ATERIALS AS NOTED ON THESE
BNwN — BUNG ANDPPRODUCEUUHORGROU AS MNs.
S, TUDIES
ARE SHOWN FOR REFERENCE ON THE PLANSD
POWER UNDERGROUNDING NOTES:
`�\/\`\/'�,X1 O GVUDE HAM Li�KEEE SPEN"LXE'6ERPHBELOW
IL
Y TALL[ L n W U.
0GRADIES75JUALUX&PULLVAULTVATHAND GAS
INS
„_,� FOES. SEE DETALI SHEETU
PIS 0
OAZEnHOpUAMrvAS X0TFo0N PwX. Po
O INTO NEW VAULTSIEE M NOTED ONNPLAIN
OCON NEST CONDUITS INTO PUTTING PS VAU UP
®LOW
auoiF eievnur a DETAIL 3, SHEET PJ4.
FELT M AT INSTALLED BY PER PRIOR TO
CONSTILLICTION. LOCATION GET NOT SEA AT EXPECT
LOCATION SHI
Ow ALM ST EXISTIIPATEINNGA E VAULT CONTRACTOR TO
T-410007
CONDUIT SCHEDULE
WHAT
wxounmxe
PARTS
AAT�A
"FERRY
Is
lour
1
LEGEND:
ons vnuLT
IN
TV LF
2
D�Cw
PORNRVAULT
OCONSTRUCTION
NOTE
CONDUIT NOTE
o
a�OUNTED,pMLE
NODYY vertu DUVALL AVE NE o. PU2
ae +.R APPROVED
ON y
RECORD NATATION IREN
DRAWINGS POWER UNDERGROUNDING PUN ADS
NUMBER PEVWNDUATIrnJx kmW„A STA 916+50 TO STA 921+50 FT
FOR SHEET 2 OF N6 �-°E=