Loading...
HomeMy WebLinkAboutT-410007As 4 u r °I Ifr ,,,,� BITS I d �BB*W BEBW x DUVALLAVENUE HE 1— L44d1 T� SEW SRI 91 PLAN GENERAL NOTES: L CONSIOULITY OF THE STRUCTION SHARED nWHBMCTSE GRAPHBEPROMPT u PTOTHTH XNTOx LITTLE ENGNEER FORPROPOSED UTILITY AGREESL ALL VAULTS FNRµAND LOCATIONS CONDDUTXEAT BE INSTALLED AT \`� _. --_ Z THE CTICN SHOWN APES HCMAnc CONTRACTOR LLL z ---- _ _ sH ' -�-- mRR FORT V UVIDAND ELEVATORS WITH FILE ENGINEER FLUOR THE ' 3. UNAnIXISANDTRIENNSRDEKOD0PDINATED .IA)OCR WITH PSEJPIOR TO CONSTRUCTION, W ALLPC 0 B 4, CONTRACTOR IS RESPONSIBLE FOR CORWATOTRENCHING INSTALLATION AN D SACKFI LL OF SE ITS ATERIALS AS NOTED ON THESE BNwN — BUNG ANDPPRODUCEUUHORGROU AS MNs. S, TUDIES ARE SHOWN FOR REFERENCE ON THE PLANSD POWER UNDERGROUNDING NOTES: `�\/\`\/'�,X1 O GVUDE HAM Li�KEEE SPEN"LXE'6ERPHBELOW IL Y TALL[ L n W U. 0GRADIES75JUALUX&PULLVAULTVATHAND GAS INS „_,� FOES. SEE DETALI SHEETU PIS 0 OAZEnHOpUAMrvAS X0TFo0N PwX. Po O INTO NEW VAULTSIEE M NOTED ONNPLAIN OCON NEST CONDUITS INTO PUTTING PS VAU UP ®LOW auoiF eievnur a DETAIL 3, SHEET PJ4. FELT M AT INSTALLED BY PER PRIOR TO CONSTILLICTION. LOCATION GET NOT SEA AT EXPECT LOCATION SHI Ow ALM ST EXISTIIPATEINNGA E VAULT CONTRACTOR TO T-410007 CONDUIT SCHEDULE WHAT wxounmxe PARTS AAT�A "FERRY Is lour 1 LEGEND: ons vnuLT IN TV LF 2 D�Cw PORNRVAULT OCONSTRUCTION NOTE CONDUIT NOTE o a�OUNTED,pMLE NODYY vertu DUVALL AVE NE o. PU2 ae +.R APPROVED ON y RECORD NATATION IREN DRAWINGS POWER UNDERGROUNDING PUN ADS NUMBER PEVWNDUATIrnJx kmW„A STA 916+50 TO STA 921+50 FT FOR SHEET 2 OF N6 �-°E=