Loading...
HomeMy WebLinkAboutReport 01DEPARTMENT OF COM ML ... ,TY AND ECONOMIC DEVELOPMENT ---~renton ® PLANNING DIVISION CERTIFICATE OF EXEMPTION FROM SHORELINE SUBSTANTIAL DEVELOPMENT DATE: PROJECT NUMBER: PROJECT NAME: PROJECT MANAGER: OWNER: APPLICANT: PROJECT LOCATION: PROJECT DESCRIPTION: January 28, 2016 LUA16-000058, SME Cedar River 205 Project Levee Certification Jill Ding, Senior Planner 1055 S Grady Way Renton, WA 98057 Joseph Farah City of Renton Airport property on the left bank of the Cedar River and City of Renton Parks property on the right bank of the Cedar River. The applicant is requesting a Shoreline Exemption for the maintenance of existing levees along the Cedar River, which would be classified as maintenance of an existing essential public facility. The project site is located within the Shoreline High Intensity designation and is within Reach A of the Cedar River. The Cedar River levees are part of the Cedar River Section 205 Flood Damage Reduction Project (Cedar River 205 Project) constructed in cooperation with the United States Army Corps of Engineers (USACE). The levees are located on the lower 1.25 miles of the Cedar River and extend from Williams Avenue North to the mouth of the Cedar River at Lake Washington. The Cedar River 205 Project protects portions of downtown Renton, the B0ein1 737 plant, and the Renton Airport from the 100-year flood. Following the completion of the project, the City of Renton became of the local sponsor of the project and entered into an agreement with the USACE for maintenance and inspection of the flood protection facilities under PL84-99. On July 10, 2012 USACE sent a letter to the City indicating that the levee certification letter would expire on August 31, 2013 because they would no longer be certifying levees and would not be providing the National Flood Insurance Program levee system evaluation to FEMA. The Cedar River 205 Project levee system certification to FEMA levee standards allows for FEMA accreditation of the levee system as providing 100-year level of flood protection. Accreditation enables the properties protected by the levee system to remain mapped as protected areas instead of being mapped in the FEMA 100-year floodplain, ensuring that the protected properties would not need to conform to floodplain insurance and development regulations. Tetra Tech, Inc. was contracted by the City, to provide all necessary Page 1 of 3 City of Renton Department of Commun it; ;onomic Development Certificate of Exi.. . ,don from Shoreline Substantial Development LUA16-000058, 5ME Cedar River 205 Project Levee Certification SEC-TWN-R: LEGAL DESCRIPTION: (King County Assessor) SEC-TWN-R: LEGAL DESCRIPTION: (King County Assessor) engineering consultant services required to recertify the Cedar River 205 Project levees and floodwalls. Phase 1 work of this project mainly consists of preliminary data collection and analysis, as well as preliminary hydraulic and geotechnical assessments. It includes a top of levee survey and a site reconnaissance in order to assess and inspect the levees and floodwalls. Phase 2 work will include supplemental data collection (mainly consisting of geotechnical borings) and the technical analysis required for certifying the levees. A levee certification report is expected to be completed and submitted to FEMA as part of the Phase 2 contract. In order to facilitate the levee inspection efforts of the work in Phase 1, the City of Renton will perform limited clearing of vegetation along the left bank of the Cedar River from Logan Avenue North to the North Boeing Bridge. This clearing will allow the inspection team to assess the stability of the embankment, a component of the Levee Certification analysis. Areas of vegetation removal generally consist of 10-foot wide strips at 200-foot intervals, from the top of vegetation to the river water surface. Additionally, a 4-foot path behind the tloodwall would be cleared in order to provide accessibility for the inspection. Clearing the inspection path behind the floodwall is not only a routine maintenance activity of an essential City of Renton Public works facility, but is also a necessary component of agreement with the USACE that would facilitate future inspections by USACE staff. Recent periodic and annual inspections have flagged the density of the vegetation on the riverside of the floodwalls as "unacceptable". A such, vegetation maintenance would ensure that the Cedar River 205 Project would remain compliant with the terms of its operation and maintenance manual and PL84-99 requirements. The Phase 2 work plan -to be prepared at the conclusion of Phase 1 -will include approximately 8 to 10 geotechnical borings that would be needed to have a complete profile of existing soils along the Cedar River Levee alignment. The borings would take place along the landward side of the flood wall and levee on the left bank and near the trail (the top of the levee in many locations along the right bank). All areas disturbed by drilling will be restored to existing conditions. Restoration following drilling, surveying, and any other land disturbing activity will be coordinated with City of Renton Parks and Airport staff designated as design team members on the project. SE07-23-5 PORTION CW #2 LOCATED ON W BANK OF CEDAR RIVER IN E 1/2 OF SECTION 07-23-05 & MORE PARTICULARY DESCRIBED AS TRACTS 1 THRU 6 AS SHOWN ON CITY OF RENTON ENGINEER MAP B 92-50 DATED MAY 23, 1957 TGW BLOCK A & B OF LAKE WASHINGTON SHORE LANDS 3RD SUPL SE07-23-5 POR SECS 7 & 18-23-5 & POR TOBI NS DC INCL POR PLAITED & VAC STS LY WLY OF COMM WW# 2 N OF N LN DIXIE AVE & ELY OF STATE HWAY # 5 & ELY & SLY OF FOLG LN BEG ON ELY MGN SD HWAY AT PT 5 FT S OF N LN OF Page 2 of 3 City of Renton Department of Community ;anomic Development Cedar River 205 Project Levee Certification Certificate of Ext. ,,don from Shoreline Substantial Development LUA16-000058, SME LOT 8 BLK 18 BRYN MAWR TH E 89.23 FT TH N 05-16-51 E 438.90 FT TH N 40-09-47 E 188.55 FT TH N 60 FT TH N 29-00-40 W 197.07 FT TH S 88-27-28 E 90.83 FT TH N 01-32-32 W 40 FT TH S 88-27-28 E 234.53 FT TH S 35-00-00 E 142.41 FT THE 403.70 FT LESS LOTS 19 TO 22 INCL BLK 4 RENTON REAL ESTATE COS 1ST ADD LESS PORTION FOR LANE HANGAR CONDOMINIUM WATER BODY: Cedar River An exemption from a Shoreline Management Substantial Development Permit is hereby Approved on the proposed project in accordance with RMC 4.9.190C 'Exemption from Permit System' and for the following reasons: Normal maintenance or repair of existing structures or developments, including damage by accident, fire or elements. "Normal maintenance" includes those usual acts to prevent a decline, lapse, or cessation from a lawfully established condition. "Normal repair" means to restore a development to a state comparable to its original condition, including but not limited to its size, shape, configuration, location and external appearance, within a reasonable period after decay or partial destruction, except where repair causes substantial adverse effects to shoreline resource or environment. Replacement of a structure or development may be authorized as repair where such replacement is the common method of repair for the type of structure or development and the replacement structure or development is comparable to the original structure or development including but not limited to its size, shape, configuration, location and external appearance and the replacement does not cause substantial adverse effects to shoreline resources or environment. The proposed development is: Consistent with the policies of the Shoreline Management Act. Not Applicable to the guidelines of the Department of Ecology where no Master Program has been finally approved or adopted by the Department. Consistent with the City of Renton Shoreline Master Program. SIGNATURE & DATE OF DECISION: Jennifer Henning, Planning Director Date The administrative land use decision will become final if not appealed in writing together with the required fee to: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057 on or before 5:00 pm, on February 11, 2016. Additional information regarding the appeal process may be obtained from the Rentor City Clerk's office, Renton City Hall -7th Floor, (425) 430-6510. Attachments: Vicinity/Neighborhood Detail Map, Site Plan cc: City of Renton Joseph Farah -Applicant Page 3 of 3 N one 0 1,023 0 512 1,023 Feet S_ 1984_ Web_Mercator_Auxiliary _ Sphere City of Renton e Finance & IT Division Vicinity Map Legend City and County Boundary l Other [,] City of Renton lnfonnatlon Technology • GIS RentonMapSupport@Rentonwa.gov 1/28/2016 Th,s map ,s a user generate<! s111tic output from an Internet mapping s,te and ts for reference on1y Dela layers that appear on tt'ls map may or may not be accurate cu rrent or otherwise rehable THIS MAP IS NO T TO BE USED FOR NAVIGATION Type Ill Levee -Clear vegetation In 10 ft wide 1trlp1 at 200 ft Intervals • clear from top of levee to edge of water -Clear crown of levee for entire length .. ··•···· ·•·•·· ... -Clear vegetation In 10 ft wide 1trlp1 at 3 equally spaced Intervals • clear from top of levee to edge of water -Brush path for walking along rlverward aide of floodwall Note: Fl oodwall an d levee a l ignments are ap prox imate. ···•· •······ ······· '•,,, ·····• .................... Proposed ~k Stabilization Repair Area s from Cedar River Gravel Removal Plan Set Re alrlD Re alrT e SR l Ban k St ab i lizati o n Re p air GRl Gab ion Re m ova l MAl Mai ntenance Re air 851 Ne w Ban k Stabili zation SR2 Ban k St ab i l ization Re p a i r SR3 Bank St ab i l izati on Re air MA2 Mainte n ance Rep air MA3 Ma i nte nance Re p ai r M a inte n an ce Re p air -~---------------' -----\------------------- --- [ 11:] TETRA TECH --------~__:==:i 500 F~t ~ 0 250 ~ -Curb Wall Earth Levee Lower Cedar River Flood Control Project Desi n Ali nment -Earth Berm -Floodwall lklng Ide of -Clear vegetation In 10 ft wide strips at 200 ft Interval• -clear from top of levH to edge of water -Brush path for walking along rlverward side of floodwall ······· ··•·· ···•·• •·•·•· .. . . .. .... .•.. ,· .. ... .. .... -----------,•· -Clear vegetation In 10 ft wide strips at 200 ft Intervals -clear from top of levee to edge of water "'······ ·········· ······••·· ........ ... , -Clear vegetation In 10 ft wide strips at 3 equally spaced Intervals -clear from top of levee to edge of water -Brush path for walking along rlverward side of ftoodwall Note: Floodwall and levee alignments are approximate. ·' .. .. .. .. .. ••• ProposedYank Stabilization Repair Areas from Cedar River Gravel Removal Plan Set Repair ID Re air T e SRl Bank Stabilization Rep air GRl Gabion Removal MAl Maintenance Re air BSl New Bank Stabilization SR2 Bank Stabilization Repair SR3 Bank Stabilization Repair MA2 MA3 l~I TETRA TECH o·------2~L..----==:=Js~~t ~ -curb Wall Earth Levee Lower Cedar River Flood Control Project Desi n Ali nment -Earth Berm -Floodwall -Clear vegetation In 10 ft wide strips at 200 ft Intervals • clear from top of levee to edge of water -Brush path for walklng along rlverward side of floodwall Note : Flood wall and levee a lignments are app rox imate. Proposed Bank Stablllzatlon Repair Areas from Cedar River Gravel Removal Plan Set Re alr1D SRl Ban k St ab i l iza t i on Re p air GR l Gabio n Re mova l MAl Mai n t e n an ce Re air BSl New Bank Sta b i li za t ion SR2 Ban k St abilizati o n Repair SR 3 Bank Stabilizati o n Re pair MA2 M aintenance Re p air MA3 Ma i ntenan ce Re p air MA4 M ainte n an ce Re pair [ °11: j TETRA TECH --------~__..:==500~1 Ll 0 250 ~ -Curb Wall Earth Levee Lowe r Ce da r River Flood Con t rol Project Desi n Ali nment -Earth Berm -Floodwall DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT PLANNING DIVISION CERTIFICATE OF EXEMPTION FROM SHORELINE SUBSTANTIAL DE'tE-l~~~=------. CONCURRENCE DATE: PROJECT NUMBER: PROJECT NAME: PROJECT MANAGER: OWNER: APPLICANT: PROJECT LOCATION: PROJECT DESCRIPTION: January 28, 2016 LUAlG-000058, SME Cedar River 205 Project Levee Certification Jill Ding, Senior Planner 1055 S Grady Way Renton, WA 98057 Joseph Farah DATE /,I$.$ /1\e NAME , l, I\ City of Renton Airport property on the left bank of the Cedar River and City of Renton Parks property on the right bank of the Cedar River. The applicant is requesting a Shoreline Exemption for the maintenance of existing levees along the Cedar River, which would be classified as maintenance of an existing essential public facility. The project site is located within the Shoreline High Intensity designation and is within Reach A of the Cedar River. The Cedar River levees are part of the Cedar River Section 205 Flood Damage Reduction Project (Cedar River 205 Project) constructed in cooperation with the United States Army Corps of Engineers (USACE). The levees are located on the lower 1.25 miles of the Cedar River and extend from Williams Avenue North to the mouth of the Cedar River at Lake Washington. The Cedar River 205 Project protects portions of downtown Renton, the B0ein1 737 plant, and the Renton Airport from the 100-year flood. Following the completion of the project, the City of Renton became of the local sponsor of the project and entered into an agreement with the USACE for maintenance and inspection of the flood protection facilities under PL84-99. On July 10, 2012 USACE sent a letter to the City indicating that the levee certification letter would expire on August 31, 2013 because they would no longer be certifying levees and would not be providing the National Flood Insurance Program levee system evaluation to FEMA. The Cedar River 205 Project levee system certification to FEMA levee standards allows for FEMA accreditation of the levee system as providing 100-year level of flood protection. Accreditation enables the properties protected by the levee system to remain mapped as protected areas instead of being mapped in the FEMA 100-year floodplain, ensuring that the protected properties would not need to conform to floodplain insurance and development regulations. Tetra Tech, Inc. was contracted by the City, to provide all necessary Page 1 of 3 -DEPARTMENT OF COMMul-v AND ECONOMIC DEVELOPMENT ----------Rentoii. ® Planning Division LAND USE PERMIT MASTER APPLICATION PROPERTY OWNER(S) PROJECT INFORMATION PROJECT OR DEVELOPMENT NAME: NAME: Citv of Renton Cedar River 205 Project Levee Certification PROJECT/ADDRESS(S)/LOCATION AND ZIP CODE: ADDRESS: 1055 South Gradv Wav City of Renton Airport property along the left bank of the Cedar River and City of Renton Parks propoety on CITY: ZIP: the right bank of the Cedar River. Zip Code 98057. Renton, WA 98057 TELEPHONE NUMBER: 425-430-6400 KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S): 072305-9007 APPLICANT (if other than owner) NAME: City of Renton Surface Water Utility EXISTING LAND USE(S): Employment Area Attn: Joseph Farah COMPANY (if applicable): PROPOSED LAND USE(S): No Change EXISTING COMPREHENSIVE PLAN MAP DESIGNATION: ADDRESS: 1055 South Gradv Wav Employment Area PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION CITY: ZIP: (if applicable) NA Renton, WA 98057 TELEPHONE NUMBER: EXISTING ZONING: Medium Industrial, Heavy Industrial 425-430-7205 CONTACT PERSON PROPOSED ZONING (if applicable): NA NAME: SITE AREA (in square feet): 60,000 Same as Aoolicant SQUARE FOOTAGE OF PUBLIC ROADWAYS TO BE COMPANY (if applicable): DEDICATED: 0 SQUARE FOOTAGE OF PRIVATE ACCESS EASEMENTS: ADDRESS: 0 PROPOSED RESIDENTIAL DENSITY IN UNITS PER NET CITY: ZIP: ACRE (if applicable) NA TELEPHONE NUMBER AND EMAIL ADDRESS: NUMBER OF PROPOSED LOTS (if applicable) NA NUMBER OF NEW DWELLING UNITS (if applicable): NA 1 H:\File Sys\SWP -Surface Water Projects\SWP-27 -Surface Water Projects (CIP)\27-3708 Cedar River Levee Recertification\5000 Shoreline Exemption Permit\Master Application.doc Rev: 08/2015 PROJECT INFORMATION (continued) ~--'-------''------------~ NUMBER OF EXISTING DWELLING UNITS (if applicable): PROJECT VALUE: NA $151,435 (both vegetation clearing and geotechncial borinasl SQUARE FOOTAGE OF PROPOSED RESIDENTIAL BUILDINGS (if applicable): NA IS THE SITE LOCATED IN ANY TYPE OF ENVIRONMENTALLY CRITICAL AREA, PLEASE INCLUDE SQUARE FOOTAGE (if applicable): SQUARE FOOTAGE OF EXISTING RESIDENTIAL BUILDINGS TO REMAIN (if applicable): NA SQUARE FOOTAGE OF PROPOSED NON-RESIDENTIAL BUILDINGS (if applicable): NA SQUARE FOOTAGE OF EXISTING NON-RESIDENTIAL BUILDINGS TO REMAIN (if applicable): NA NET FLOOR AREA ON NON-RESIDENTIAL BUILDINGS (if applicable): NA NUMBER OF EMPLOYEES TO BE EMPLOYED BY THE NEW PROJECT (if applicable): NA 0 AQUIFIER PROTECTION AREA ONE 0 AQUIFIER PROTECTION AREA TWO 181 FLOOD HAZARD AREA D GEOLOGIC HAZARD D HABITAT CONSERVATION 181 SHORELINE STREAMS & LAKES D WETLANDS LEGAL DESCRIPTION OF PROPERTY 60.000 sq. ft. __ sq.ft. __ sq.ft. 60,000 sq. ft. __ sq.ft. (Attach legal description on separate sheet with the followim1 Information included} SITUATE IN THE NE QUARTER OF SECTION 07, TOWNSHIP 23N, RANGE 5E, IN THE CITY OF RENTON, KING COUNTY, WASHINGTON AFFIDAVIT OF OWNERSHIP I, (Print Name/s) Joseph Farah, declare under penalty of perjury under the laws of the State of Washington that I am (please check one) D the current owner of the property involved in this application or 181 the authorized representative to act for a corporation (please attach proof of authorization) and that the foregoing statements and answers herein contained and the information herewith are in all respects true and correct to the best of my knowledge and belief. Signature of Owner/Representative Date Signature of Owner/Representative Date STATE OF WASHINGTON ) ) ss COUNTY OF KING ) I certify that I know or have satisfactory evidence that signed this instrument and acknowledge it to be his/her/their free and voluntary act for the uses and purpose mentioned in the instrument. Dated Notary Public in and for the State of Washington Notary (Print): My appointment expires: 2 H:\File Sys\SWP -Surface Water Projects\SWP-27 -Surface Water Projects (CIP)\27-3708 Cedar River Levee Recertification\5000 Shoreline Exemption Permit\Master Application.doc Rev: 08/2015 Project Narrative The Cedar River levees are part of the Cedar River Section 205 Flood Damage Reduction Project (Cedar River 205 Project) constructed in cooperation with the United States Army Corps of Engineers (USACE). The levees are located on the lower 1.25 miles of the Cedar River and extend from Williams Avenue North to the mouth of the Cedar River at Lake Washington. The Cedar River 205 Project protects portions of downtown Renton, the Boeing 737 plant, and the Renton Airport from the 100-year flood. Following the completion of the project, the City of Renton became of the local sponsor of the project and entered into an agreement with the USACE for maintenance and inspection of the flood protection facilities under PL84-99. On July 10, 2012 U5ACE sent a letter to the City indicating that the levee certification letter would expire on August 31, 2013 because they would no longer be certifying levees and would not be providing the National Flood Insurance Program levee system evaluation to FEMA. The Cedar River 205 Project levee system certification to FEMA levee standards allows for FEMA accreditation of the levee system as providing 100-year level of flood protection. Accreditation enables the properties protected by the levee system to remain mapped as protected areas instead of being mapped in the FEMA 100-year floodplain, ensuring that the protected properties would not need to conform to floodplain insurance and development regulations. Tetra Tech, Inc. was contracted by the City in December 2015, to provide all necessary engineering consultant services required to recertify the Cedar River 205 Project levees and floodwalls. Phase 1 work of this project mainly consists of preliminary data collection and analysis, as well as preliminary hydraulic and geotechnical assessments. It includes a top of levee survey and a site reconnaissance in order to assess and inspect the levees and floodwalls. Phase 2 work will include supplemental data collection (mainly consisting of geotechnical borings) and the technical analysis required for certifying the levees. A levee certification report is expected to be completed and submitted to FEMA as part of the Phase 2 contract. In order to facilitate the levee inspection efforts of the work in Phase 1, the City of Renton will perform limited clearing of vegetation along the left bank of the Cedar River from Logan Avenue North to the North Boeing Bridge, in accordance with the contract with Tetra Tech. This clearing will allow the inspection team from Tetra Tech to assess the stability of the embankment, a component of the Levee Certification analysis. Areas of vegetation removal generally consist of 10-foot wide strips at 200-foot intervals, from the top of vegetation to the river water surface. Additionally, a 4-foot path behind the floodwall would be cleared in order to provide accessibility for the Tetra Tech inspection. Clearing the inspection path behind the floodwall is not only a routine maintenance activity of an essential City of Renton Public works facility, but is also a necessary component of agreement with the USACE that would facilitate future inspections by USACE staff. Recent periodic and annual inspections have flagged the density of the vegetation on the riverside of the floodwalls as "unacceptable". A such, vegetation maintenance would ensure that the Cedar River 205 Project would remain compliant with the terms of its operation and maintenance manual and PL84-99 requirements. The Phase 2 work plan -to be prepared at the conclusion of Phase 1 -will include approximately 8 to 10 geotechnical borings that would be needed to have a complete profile of existing soils along the Cedar River Levee alignment. Areas where borings would mostly likely be needed are shown in Figure 1. The borings would take place along the landward side of the floodwall and levee on the left bank and near the trail (the top of the levee in many locations along the right bank). All areas disturbed by drilling will be restored to existing conditions . Restoration following drilling, surveying, and any other land disturbing activity will be coordinated with City of Renton Parks and Airport staff designated as design team members on the project. Figure 1 -Likely locations for Geotechnlcal Borings In Phase 2 Therefore, a shoreline exemption permit is requested for this project under the category of "normal maintenance and repair of existing structure or development". The following is additional information about the proposed work: • Anticipated Dates of work: Vegetation clearing will take place for approximately 3 weeks in February and March 2016. Geotechnical borings will take place in the timeframe of June to September 2016. • There are no other permits required • There are no hazardous areas, steep slopes or wetlands on the project site • The project area is a medium and heavy industrial employment area and the proposed work will not alter the use of the area • Soil type in the area varies. Below the top surface (grass, concrete or asphalt), the soil consists of a mix of sand and silt • The total estimated cost of the vegetation clearing work is $51,435. The total estimated cost for future geotechnical explorations is approximately $100,000 • There will be no excavation or filling activities except as required by City staff for restoration along the trail • No trees will be removed or impacted • The nature of the existing shoreline is rip rap along the airport clear zone (downstream portion of left bank) and a vegetation mix of blackberries and knotweeds elsewhere • The closest area of work to the Ordinary High Water Mark is nil because the vegetation clearing along the left bank will extend to the river water surface in the strips cleared for levee embankment analysis. " ·- DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT --------Renton® WAIVER OF SUBMITTAL REQUIREMENTS FOR LAND USE APPLICATIONS Planning Division 1055 South Grady Way-Renton, WA 98057 Phone: 425-430-7200 I www.rentonwa.gov LAND USE PERMIT SUBMITIAL REQUIREMENTS: WAIVED MODIFIED BY: BY: Arborist Report 4 Biologica I Assessment , Calculations 1 , Colored Maps for Display 4 Construction Mitigation Description ZAND.• Deed of Right-of-Way Dedication 1 Density.Worksheet, Drainage Control Plan, ' ' Drainage Report 2 ' ' '. Elevations, Architectural 3AND, Environmental Checklist 4 Existing Covenants (Recorded Copy) 1 AND, Existing Easements (Recorded Copy) lAND·, Flood Hazard Data 4 JD Fl_oor Plans 3AND4 Geotechnical Report, AND, Grading Elevations & Plan, Conceptual 2 Grading Elevations & Plan, Detailed, Habitat Data Report, JD Improvement Deferral , Irrigation Plan, PROJECT NAME: COMMENTS: -------------------- DATE: -------------------- 1 H:\File Sys\SWP -Surface Water Projects\SWP-27 -Surface Water Projects (CIP)\27-3708 Cedar River Levee Recertification\5000 Shoreline Exemption Permit\Waiver.docx Rev: 08/2015 ... '• LAND USE PERMIT SUBMITTAL REQUIREMENTS: WAIVED MODIFIED COMMENTS: BV: BV: King County Assessor's Map Indicating Site 4 Landscape Plan, Conceptual, Landscape Plan, Detailed 4 Legal Description 4 Letter of Understanding of Geological Risk 4 Map of Existing Site Conditions, Master Application Form 4 Monument Cards (one per monument) 1 Neighborhood Detail Map 4 Overall Plat Plan 4 Parking, Lot Coverage & Landscaping Analysis 4 Plan Reductions {PMTs) 4 Post Office Approval 2 Plat Name Reservation 4 Plat Plan 4 Preapplication Meeting Summary 4 Public Works Approval Letter, Rehabilitation Plan 4 Screening Detail 4 Shoreline Tracking Worksheet 4 Site Plan ,,.04 Stream or Lake Study, Standard, JD Stream or Lake Study, Supplemental 4 Stream or Lake Mitigation Plan 4 Street Profiles 2 Title Report or Plat Certificate 1••0• Topography Map, Traffic Study 2 Tree Cutting/Land Clearing Plan 4 Urban Design Regulations Analysis 4 Utilities Plan, Generalized 2 Wetlands Mitigation Plan, Final 4 Wetlands Mitigation Plan, Preliminary 4 2 H:\File Sys\SWP -Surface Water Projects\SWP-27 -Surface Water Projects (CIP)\27-3708 Cedar River Levee Recertification\5000 Shoreline Exemption Permit\Waiver.docx Rev: 08/2015 LAND USE PERMIT SUBMITIAL REQUIREMENTS: Wetlands Report/Delineation 4 Wireless: Applicant Agreement Statement 2 AND, Inventory of Existing Sites 2 AND, Lease Agreement, Draft 2 AND, Map of Existing Site Conditions 2 AND 3 Map of View Area 2AND3 Photosimulations, AND, This Requirement may be waived by: 1. Property Services 2 Development Engineering Plan Review 3 Building 4 Planning WAIVED MODIFIED COMMENTS: BY: BY: JD - 3 H:\File Sys\SWP -Surface Water Projects\SWP-27 -Surface Water Projects {CIP)\27-3708 Cedar River Levee Recertification\SOOO Shoreline Exemption Permit\Waiver.docx Rev: 08/2015 SHORELINE TRACKING WORKSHEET City of Renton Planning Division 1055 South Grady Way, Renton, WA 98057 Phone: 425-430-7200 Fax: 425-430-7231 The City of Renton is required by the Washington State Department of Ecology to track and evaluate the effectiveness of the Shoreline Master Program at achieving no net loss of shoreline ecological functions with respect to shoreline projects. The City will use shoreline development tracking information to prepare a Shoreline Master Program report every eight years to comply with the Shoreline Management Act requirements. SHORELINE STABILIZATION 1. Is there currently a bulkhead on your site? [gJ Yes D No; If yes, fill out table below. If no, see "Site Conditions", Section 2 below. What Type of Materials Is Your Bulkhead Made of? Linear Feet of Hard Materials: There is riprap (hard) on the levee embankment 1700 LF north of the floodwall along the airport clear zone in the downstream-most portion of the Cedar River left Linear Feet of Soft bank. Materials: NA Examples of Types of Bulkheads: Hord (e.g. rocks, wood; Soft (e.g. sand, plants); Combination-soft materials at the water with hard materials furtherer inland, or o combination of hard and soft materials at the water. SITE CONDITIONS 2. List the size (in square feet) and type of all structures (1'1 floor only) on your property (e.g. 2,000 sq. ft. house, 125 sq. ft. greenhouse). The proposed work will take place on areas containing no buildings or structures. A few geotechnical borings may take place on asphalt surfaces within the airport. Otherwise all surveying, vegetation clearing and geotechnical boring will take place on grassy areas or the river bank. Note that the Cedar River 200-ft shoreline buffer where the project work will take place includes aircraft hangars, the Renton Stadium and a Boeing building. It is assumed that defining the areas of these buildings within the whole shoreline buffer is not a requirement for the project work proposed. -1 - H:\File Sys\SWP -Surface Water Projects\SWP-27 -Surface Water Projects (CIP)\27-3708 Cedar River Levee Recertification\5000 Shoreline Exemption Permit\Shoreline Tracking Worksheet.docx 09/13 3. List distance (in feet) from the water to the closest point of each structure. List each building separately (e.g. shed, dock, carport). Not Applicable. 4. List the size (in square feet) and type of all impervious surfaces (e.g. driveway, parking area, walkway, patio). A few geotechnical borings may take place on asphalt surfaces within the airport. Otherwise all surveying, vegetation clearing and geotechnical boring will take place on grassy areas or the river bank. Note the Cedar River 200-ft shoreline buffer where the project work will take place includes a trail and several parking lots on the right bank and roads, parking lots and airport runways/taxiways on the left bank. It is assumed that defining the areas of these impervious surfaces within the whole shoreline buffer is not a requirement for the project work proposed. 5. List distance (in feet) from the water to the closest point of each impervious surface (hard surface. Not Applicable. 6. Describe the existing vegetation within 100 ft. of the waterline. Estimate the amount (in square feet) of native vegetation. Grass and ornamental plantings (e.g. plants requiring care ar grown Jar decorative purposes) should nat be counted. There is approximately 40,000 ft 2 of Himalayan and Cut Leaf Blackberry _and Japanese Knotweed on the Cedar River Left Bank on the project area. 7. Describe the proposed vegetation within 100 ft. of the waterline. Estimate the amount (in square feet) of native vegetation. Grass and ornamental plantings (e.g. plants requiring care or grown for decorative purposes) should nat be counted. There is no proposed vegetation. 8. Will the project require any added fill? If so, how many cubic yards will be added: -2 - H:\Flle Sys\SWP -Surface Water Projects\SWP-27 -Surface Water Projects (CIP)\27-3708 Cedar River Levee Recertification\5000 Shoreline Exemption Permlt\Shoreline Tracking Worksheet.docx 09/13 I ·, \ The project will not require any added fill. IN WATER AND OVER WATER STRUCTURES 9. Are there any in or over water structures on your site (e.g. docks, floats, bridges, mooring piles, boatlifts)? 181 Yes D No; If yes, fill out the table below. Describe the in and over water structures on your site Type Surface Area Light Penetrating Materials (e.g. dock, float, bridge, (in square feet, if (the percentage of the mooring pile, boat lift, etc.) applicable) surface area that is made of material that allows light to reach the water) The project area includes NA NA Existing bridges over the Cedar structures River (North Boeing Bridge, to remain South Boeing Bridge, and Logan Ave N Bridge). Those bridges will not be affected by the proposed work and will remain intact. Existing NA NA NA structures that will be removed Proposed NA NA NA structures -3 -09/13 H:\File Sys\SWP -Surface Water Projects\SWP-27 -Surface Water Projects (CIP)\27-3708 Cedar River Levee Recertification\5000 Shoreline Exemption Permit\Shoreline Tracking Worksheet.docx