Loading...
HomeMy WebLinkAboutRoadway & Sidewalk Opening & Map for Solera & Astra 82924 REV001DATEREVISION#0SCALE: 1" = 40'4011th Street GateEAST11th & SunsetGate EASTRetailShell WESTGate10th StreetGateAll Construction Deliveries andGarbage Load Out Access untilProject is completed for WEST &EAST Towers through the 10thStreet Gate.EAST TowerWEST Tower2950 11th Street2955 11th StreetConstruction Legend & Construction Access Map1234567813141919 8191919191919191919Roadway Open to General PublicNo Restrictions 11.1.24Sidewalk Open to General PublicNo Restrictions 11.1.24General PublicPedestrian Restrictions11.1.24Deliveries & Load Out Area8' Construction Access GatesConstruction Site EntranceOne Way SIgn 5 6 6 6 6 7 7 7 7 3 3 3 3 3 3 3 3 3 3 3 3 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 9Sidewalk Closed @ Building "B" to GeneralPublic 9 9 9 9 9 9102,995 sf 10BLOCK C Hydroseeding& Stabilization (Complete by 9.13.24) 11Periodic minimal need to have flaggerfor ongoing Construction Operations in front of Building Balong Jefferson (TCP to be submittedto COR on a case by case basis) 12 12 11 11 11 11SLOW Construction Signage at 10th StreetConstruction SignageConstruction Delineation to be used as needed 15 14 14 14 14 14 15 15 15NOTE: The following roadways to be fully opened for general Public access including sidewalks on or before 11.1.2024. Exterior work along Jefferson & 11th will be completed on or before 11.1.2024 so there is minimal interruption to through traffic along Jefferson and 11th and interaction with residents located within "Astra". There may be a limited need to use a flagger should there be a need to access the relocated fence line along Jefferson or 11th. This will be treated as a condition whereHeartland would submit a TCP to the COR for a dayimpact only. NO Street Closures are anticipated or planned since the majority of work needing hoisting is nowcomplete on WEST Tower. East Tower will still have a hoisting need, but this can be facilitated in front of EAST Tower@ the Retail Parking area. Block D will remain as employee parkingonly after 11.1.2024Construction Access Map including Roadway & Sidewalk Openings for the General Public (Full Opening expected on or before 11.1.2024) 16BLOCK D to remain for Construction Employee Parking ONLY. NO Fencing will remain past 11.1.2024 16 16 16 16 16REV 001 8.29.241