Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutAddendum - 1Docusign Envelope ID: 57225619-8DE0-4F4F-935D-E111A8E6BB7D
AMENDMENT NO. 1 TO AGREEMENT FOR TALBOT HILL
RESERVOIR PARK SITE IMPROVEMENTS
THIS AMENDMENT, dated for reference purposes only as _____ _, 2024, is by and
between the City of Renton (the "City"), a Washington municipal corporation, and Hough Beck &
Baird, Inc. ("Consultant"), a Washington Profit Corporation. The City and the Consultant are
referred to collectively in this Amendment as the "Parties." Once fully executed by the Parties,
this Amendment is effective as of the last date signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-24-069, dated
March 22, 2024, to provide necessary services for the Talbot Hill Reservoir Park Site
Improvements (referred to herein as the "Agreement");
Whereas, the Parties wish to amend the Agreement to change the scope of work, change the
time for performance, and change the compensation in order to provide additional professional
services for the Philip Arnold Park site improvements.
NOW THEREFORE, It is mutually agreed upon that CAG-24-069 is amended as follows:
1.Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit
A-1, which is attached and incorporated herein.
2.Time of Performance: Section 3, Time of Performance, is amended pursuant to the
schedule set forth in Exhibit A-1. All Work shall be performed by no later than June 30,
2025.
3.Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased by$ 48,756.00 from$ 78,730.50 to
$ 127,486.50. plus any applicable state and local sales taxes. The additional
compensation shall be paid based upon Work actually performed according to the rate(s)
or amounts specified in Exhibit A-1, which is attached and incorporated herein.
4. All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
CAG-24-069, Adden #1-24
August 29
Approved by Cheryl Beyer via email 8/21/2024
Docusign Envelope ID: 57225619-8DE0-4F4F-935D-E111A8E6BB7D
Project: Talbot Hill Reservoir Park Improvements Owner: City of Renton Prime Firm: Hough Beck & Baird Inc. (HBB) Date: 08/19/24
2 SITE DESIGN SET
Summary
3 BID & CONSTRUCTION ADMIN SUPPORT I Reimbursable Expenses
lsuBTOTALS
l�OTAL CONTRACT COST
Exhibit A-1 AMENDMENT #1 EXHIBIT: Fee Spreadsheet, 1 of 3
HBB PND
$16,900.00 $13,702.00 $9,635.00 $7,481.00
1$ 100.00 1 $200.00 1
1$ 2s.s3s.oo I $22.121.001
II 1 4S,756 .00 II
Docusign Envelope ID: 57225619-8DE0-4F4F-935D-E111A8E6BB7D
Project:
Owner:
Firm:
Date:
Talbot Hill Reservoir Park Improvements
City of Renton
Hough Beck & Baird Inc. (HBB)
08/19/24
Scope of Work
2 SITE DESIGN SET
2.1 Monthly Reporting & Invoicing
2.6 Site Desi n Set Spec Notes, Details, + 9 Sheets 2.7 Cost Estimates Bid Tabs 2.8 Meetin s 6 + Site Visit
3 BID & CONSTRUCTION ADMIN SUPPORT
3.1 Addendum (1)
3.2 Field Reviews & Reports (+4) 3.3 Submittals ( +6) 3.4 RFls (8) 3.5 ChanQe Order (1) 3.6 Record DrawinQs (1) 3.7 Bid Support
!Total Hours
!Total Cost
Reimbursable Expenses
Mileage, parking, reproduction, printing, and other project related costs.
Principal PM / LA
Exhibit A-1 AMENDMENT#1 EXHIBIT:
Fee Spreadsheet, 2 of 3
Design Comp./Tech
$ 235.00 $ 210.00 $ 175.00 $ 150.00
40 0
20 8 12
I 41 II 0
16 15
10
11 81 11 o 11 $19,035.00 $0.00
0
II 0
11 o $0.00
46
4
II 0 IOI $91635.00
11 50 10 $7,500.00 11 s2s,s3s.oo
Reimbursable Expenses $
11
TOTAL COST OF SERVICES! $26,635.00 I
Docusign Envelope ID: 57225619-8DE0-4F4F-935D-E111A8E6BB7D
Project:
Owner:
Firm:
Date:
Talbot Hill Reservoir Park Improvements
City of Renton
PND Engineers
08/19/24
Scope of Work
2 SITE DESIGN SET
2.1 Monthly Reporting & Invoicing
2.2 Project Contract, Schedule, & Meeting Notes (HBB)
2.3 Schematic Set Coordination (HBB)
2.4 Quality Control Reviews (2)
2.5 Kick-off MeetinQ & Site Visit
2.6 Site Design Set (Spec Notes + 2 Sheets)
2.7 Cost Estimates (Bid Tabs)
2.8 Meelinas (6 + Site Visit)
3 BID & CONSTRUCTION ADMIN SUPPORT
3.1 Addendum (1)
3.2 Field Reviews & Reports (+4)
3.3 Submittals ( + 7)
3.4 RFls(12)
3.5 Change Order (1)
3.6 Record Drawinas (1)
3.7 Bid Support
Senior Engineer
VIIPIC
$ 265.00
I 6 II
6
I 3 II
1
1
1
Senior Engineer Senior Engineer
VI PM/CIVIL IV PM/CIVIL
$ 246.00 $ 206.00
5 II 18 II
4 10
1 2
6
3 II 18 II
4
2 6
1 8
Exhibit A-1 AMENDMENT #1 EXHIBIT:
Fee Spreadsheet, 3 of 3
Senior Engineer Senior Engineer CAD Admin TASK IV Structural I Designer VI Technician IV SUBTOTAL
$ 206.00 $ 168.00 $ 150.00 $ 121.00
17 II 4 II 20 II 0 II $13,702.00 11
12 20
2
3 4
13 II 0 II 2 II 0 II $7,481.00 11
7
6 2
0
$0.00
Reimbursable Expenses
TOTAL COST OF SERVICES! $