Prepared for:
iCap Lakeview, LLC
3535 Factoria Blvd
Suite 500
Bellevue, WA 98006
Prepared by:
CPH Consultants
Bryce Bessette and
Jamie Schroeder, PE
1 1431 Willows Road NE
Suite 120
. Redmond, WA 98052
February 25, 2016
• • • • • • • • • • • • • • :•
I • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
CPH
CONSULTANTS
11431 WILLOWS ROAD NE, SUITE 120
REDMOND, WA 98052
~(425) 285-2390 I S(425) 285-2389
www.cphconsultonts.com
SENZA LAKEVIEW
RENTON, WASHINGTON
PRELIMINARY TECHNICAL INFORMATION REPORT
February 25, 2016
Prepared For:
iCap Lakeview, LLC
3535 Fadoria Blvd SE, Suite 500
Bellevue, WA 98006
Prepared By,
CPH Consultants
Jamie B. Schroeder, PE
Bryce Bessette, EIT
CPH Projed No. 0139-15-001
r-:·('"
L' ...
( .
p~
Sile Planning
Civil Engineering
Project Management
Land Developmenl Consulting
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
CPH
CONSULTANTS
TECHNICAL INFORMATION REPORT
SENZA LAKEVIEW
CITY OF RENTON, WA
TABLE OF CONTENTS
SECTION I -PROJECT OVERVIEW -----------------------------------------------------------------------------------------------------------------3
FIGURE l -VICINITY MAP
FIGURE 2 -TIR WORKSHEET
SECTION 2 -CONDITIONS AND REQUIREMENTS SUMMARY _____________ -------------------------------------------------------------------9
SECTION 3 -0FFSITE ANALYSIS -----------------------------------------------------------------------------------------------------------------l l
SECTION 4-FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN ________________________________________ _l_;l
SECTION 5 -CONVEYANCE SYSTEM ANALYSIS AND DESIGN ---------------------------------------------------------------------------17
SECTION 6 -SPECIAL REPORTS AND STUDIES ------------------------------------------------------------------------------------------------1 8
SECTION 7 -OTHER PERMIT -----------------------------------------------------------------------------------------------------------------------1 9
SECTION 8 -CSWPPP ANALYSIS AND DESIGN ---------------------------------------------------------------------------------------------20
SECTION 9-BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT-------------------------------23
SECTION I 0-OPERATIONS AND MAINTENANCE MANUAL -----------------------------------------------------------------------------24
FIGURES------------------------------------------------------------------------------------------------------------------------------------------------------
FIGURE 3 -EXISTING SITE CONDITIONS
FIGURE 4 -DEVELOPED SITE CONDITIONS
FIGURE 5 -DRAINAGE BASINS
FIGURE 6 -UPSTREAM BASINS
FIGURE 7 -DOWNSTREAM MAP
APPENDICES -------------------------------------------------------------------------------------------------------------------------------------------------
APPENDIX A-NRCS SOILS REPORT
APPENDIX B -WWHM REPORTS
APPENDIX C -PROJECT SITE AND UPSTREAM LAND USE SUMMARIES
APPENDIX D -STORMFILTER PARAMETERS SUMMARY
APPENDIX E -CONVEYANCE BACKWATER ANALYSIS
APPENDIX F -0FFSITE ANALYSIS TABLE AND DOWNSTREAM PHOTOS
lite Planning
Civil Engineering
Project Management
Land Development Consulting
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Senza Lakeview Preliminary Technical Information Report
SECTION 1 -PROJECT OVERVIEW
This Technical Information Report (TIR) is provided to describe the stormwater conditions and proposed
drainage improvements for the Senza Lakeview project. The project proposes to subdivide and redevelop
four existing properties into seventeen individual single-family residential parcels within the City of Renton .
This report is provided to identify the applicable storm drainage standards and to summarize the analyses
and design provisions proposed for the project to comply with city surface water standards. The information
provided within this TIR represents the basis of design for the storm drainage systems and surface water
conditions for the project .
The project is located in the northern tip of the City of Renton. The vicinity map provided below as Figure 1
illustrates the general location of the property along Lake Washington BLVD N to the west, Park Ave N to the
east and North 40'" St to the north. The street address of the project site is 11 29 N 40'" Street (King County
tax parcel nos. 334270-0415, -0420, -0425, and -0427). More generally, the site is located in the SW v. of
the NW 'I• of Section 32 of Township 24 North, Range 5 East, in King County, Washington (see Vicinity Map
below) .
LAKE WASHINGTON
VICINITY MAP
CPH Proiect No. 01 39-15-001
CPIH CONSULTANTS
NOTTO SCALE
Figure 1-Location/Vicinity Map -Not to Scale
February 25, 2016
Page 3
Senza Lakeview Preliminary Technical Information Report
The project site is comprised of 4 parcels; approximately 3.83 acres. A total of 3 single-fomily homes are
currently on the project site. A number of trees of varying type, age, and health condition exist on the site.
Figure 3 in the Appendix displays the existing site conditions.
The proposed subdivision will create a total of seventeen (17) single-family residential lots. In addition, the
project will include frontage improvements on Lake Washington Blvd N, Park Ave N and N 40'" St to widen
and add concrete curb, gutter, and sidewalk. Total site impervious coverage for individual lots is limited to
55% by the current site zoning. The storm drainage analysis performed for this report considered this
maximum coverage. The proposed site plan is shown in Figure 4.
The developed site is required to provide Basic Water Quality treatment in addition to Level 1 (i.e., basic)
flow control per current City of Renton surface water standards. Water quality storm volumes are proposed to
be treated with a Contech StormFilter vault in the northwest corner of the site. The site qualifies for the Direct
Discharge Exemption as the flow path from the project site discharge point is less than a half mile to the 1 00-
year floodplain of Lake Washington. This exemption is discussed further in section 2, Flow Control.
All of the storm water runoff from the improved site will be collected, controlled, and released to the existing
18" concrete pipe located at the intersection of Lake Washington BLVD N and N 40"' St. A series of on-site
catch basin inlets and underground pipes will collect and convey surface water runoff westerly within
proposed road right-of-way for the majority of the developed site to the Contech StormFilter for water
quality treatment.
A portion of the runoff along Lake Washington BLVD N will be bypassed due to the existing topography and
grade of the roads. However, to offset this untreated area, the site will be treating a larger runoff area from
existing previously untreated pavement along N 401h St. This treatment trade meets the requirements set forth
by the City of Renton standards.
Storm drainage controls for this project are proposed in accordance with City of Renton surface water
standards, including recent adoption of the 2009 King County Surface Water Design Manual and the COR
Addendum to that manual (KCSWDM).
On-site Soil Conditions
The soils of the area are characterized generally by the Natural Resource Conservation Services (NCRS) as
Alderwood gravelly sandy loam (AgC) and Indianola loamy sand (lnC). A site-specific investigation of the
existing site geotechnical conditions was performed by Earth Solutions NW, LLC. A copy of the NRCS soils
report is provided in Appendix A of this report for reference.
CPH Project No. 0139-15-001
CPjH CONSULTANTS
February 25, 2016
Page 4
• • • • • • • • • • • • • • • • • • .i
• • • • • • • • • • • • • • • • • • • • • • • • •
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Senza Lakeview Preliminary Technical Information Report
Figure 2 -Technical Information Report (TIR) Worksheet, 2009 Surface Waler Design Manual
·,:i~'ilii~iYllii~,,~~;RFf c:r;tD.>iftlitfc ·
Project Owner: Barbara Rodgers, iCop
Lakeview, LLC
Phone: (425) 278-9030
Address:
Project Engineer:
Phone:
• Landuse Services
l 0900 NE 8'" St, l 0'" Floor
Bellevue, WA 98005
Jamie Schroeder
(425) 285-2390
Subdivision / Short Subd. / UPD
D Building Services
M/F I Commercial I SFR
D Clearing and Grading
D Right-of-Way Use
• Other: Shoreline Substantial Development
Date (include revision
dates):
Date of Final:
Large Site
2/25/2016
Project Name: Senza Lakeview
DOES Permit#: _________ _
Location: Township: 24 N
Range: _5=----:E _______ --1
Section: 32
Site Address: 1129 N 40'" St.
Renton, WA
0 DFW HPA O Shoreline
0 COE404
0 DOE Dam Safety
0 FEMA Floodplain
0 COE Wetlands
Management
D Structural
Rockery IV a ult/ __
D ESA Section 7
D Other _____________ _
Site Improvement Plan (Engr. Plans)
Type (circle one): Full / Modified /
Small Site
Date (include revision
dates):
Date of Final:
Complex
Description: (include conditions in TIR Section 2)
Preapplication / Experimental /
Date of Approval: ____________ _
CPH Project No. 0139-15-001
CPIH CONSULTANTS
February 25, 2016
Page 5
Senza Lakeview Preliminary Technical Information Report
Figure 2 -Technical Information Report (TIR) Worksheet, 2009 Surface Wafer Design Manual (cont'd.)
Monitoring Required: Yes Describe:
Start Date:
Completion Date:
Community Plan:
Special District Overlays:
Drainage Basin: May Creek -----'--~----------------------------~ Stormwater Requirements: Basic Flow _:c:='-'--'-':..:.:.._-----------------------1
D River/Stream
D Lake
D Wetlands
D Closed Depression
D Floodplain
D Other
Soil Type
Inc
D High Groundwater Table (within 5 feet)
D Other ______ _
D Additional Sheets Attached
CPH Project No. 0139-15-001
CPIH CONSULTANTS
Slopes
8% -15%
5%-15%
• Steep Slope
D Erosion Hazard
• Landslide Hazard
D Coal Mine Hazard
D Seismic Hazard
D Habitat Protection
Regulated
Moderate
Erosion Potential
Yes
Yes
D Sole Source Aquifer
D Seeps/Springs
February 25, 2016
Page 6
• • • • • • • • • • • • • • • • •1 •1 .i .I • • • • • • • • • • • • • • • • • • • • • • • •
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Senza Lakeview Preliminary Technical Information Report
Figure 2 -Technical Information Report (TIR) Worksheet, 2009 Surface Water Design Manual (cont'd.)
Part l1 DRAIN.1'.QE DESIGN LIMITATIONS ....
REFERENCE
D Core 2 -Offsitc Analysis
D Sensitive/Critical Areas
0 SEPA
D Other
D
D Additional Sheets Attached
Part 12 TIR SUMMARY SHEET
Threshold Discharge Area: Wetland
(name or description) ·
Core Requirements (all 8 apply)
Discharge at Natural Location
Offsite Analysis
Flow Control
(include a facility summary sheet)
Conveyance System
Erosion and Sediment Control
Maintenance and Operation
Financial Guarantees and Liability
Water Quality
(include facility summary sheet)
Special Requirements (as annlicable)
Area Specific Drainage
Requirements
Floodplain/Floodway Delineation
Flood Protection Facilities
Source Control
(comm./induslrial landusc)
Oil Control
Other Draina2e Structures
Describe:
CPH Project No. 0139-15-00 l
C p I H CONSULT ANTS
' ,', ' ' ·,:;
LIMITATION/ SITE CONSTRAINT
(provide One TIR Summaiy SheCt' ~er. Threshold DI~Cliai-ge)Ar'f!a} .·
,.· ·-., .; ·; ,·.,:. ·.'
. . · .
Number of Natural Discharge Locations: 1
Level: ! I 2 I 3 Dated:
Level: I I 2 I 3 or Exemption Number: Direct Discharge
Small Site BMP's: Full Dispersion
Spill containment located at:
ESC Site Supervisor: TBD
Contact Phone:
After Hours Phone:
Responsibility: Private I Public
If Private, Maintenance Lou. Reuuircd: Yes I No
Provided: Yes I No
Type: Basic I Sens. Lake I Enhanced Basic I Bog
or Exemption No.
Landscape Management Plan: Yes I No
Type: CDA I SDO I MDP I BP I LMP
Name:
Type: Major I Minor / Exemption / None
100-year Base Flood Elevation (or range):
Datum:
Description:
Describe landuse: Residential
Describe any structural controls:
High-use Site: Yes I No
Treatment BMP:
Maintenance Agreement: Yes I No
with whom?:
I Shared Fae / None
February 25, 2016
Page 7
Senza Lakeview Preliminary Technical Information Report
Figure 2 -Technical Information Report (nR) Worksheet, 2009 Surface Water Design Manual (cont'd.)
• Clearing Limits
• Cover Measures
• Perimeter Protection
• Tratlic Area Stabilization
• Sediment Retention
• Surface Water Control
• Dust Control
• Construction Sequence
D Detention
D Infiltration
D Regional Facility
D Shared Facility
0 Small Site BMP's
D Other
• Drainage Easement
D Access Easement
D Native Growth Protection Covenant
• Tract
D Other
• Stabilize Exposed Surfaces
• Remove and Restore Temporary ESC
Facilities
•
•
D
D
D
• D
D
D
D
Clean and Remove All Silt and Debris Ensure
Operation of Permanent Facilities
Flag Limits of SAO and open space
preservation areas
Other ____________ _
Biofiltration
Wetpool
Media Filtration
Oil Control
Spill Control
Small Site BMP's
Other
D Cast in Place Vault
• Retaining Wall
•Rockery> 4' High
D Structural on Steep Slope
D Other
·ii}i~ · ·::~· .-. Ji:f ~: ·,I· /'.i))ii} i
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were incorporated into this
worksheet and the attached technical Information Report. To the best of my knowledge the information provided here is accurate.
CPH Project No. 0139-15-001
CPIH CONSULTANTS
Signed Date
February 25, 2016
Poge 8
• • • • • • • • • • • • • • • •1 •1 • • • • • • • • • • • • • • • • • • • • • • • • • • •
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Senza Lakeview Preliminary Technical Information Report
SECTION 2 -CONDITIONS AND REQUIREMENTS SUMMARY
Compliance with Project Drainage Requirements
The storm drainage and temporary erosion control standards for the project are established by the City of
Renton Addendum to the 2009 King County Surface Water Design Manual (KCSWDM). The project requires
Full Drainage Review as it exceeds the impervious threshold for Small Site Review (Type I or Type II) and
proposes more than 2,000 square feet of new impervious surface coverage. The KCSWDM specifies eight
core and five special requirements that are to be met for this project. Compliance and/or applicability of
each of these design standards are summarized below:
SWDM Core Requirements
l. Discharge at Natural Location: The project site currently slopes and drains northwesterly to a ditch
then to a catch basin at the intersection of Lake Washington BLVD N and N 40•h St at the northwestern
corner of the site. Roof drains, yard drains and catch basins will convey runoff to the existing
stormwater conveyance system mentioned above. On-site storm water will maintain this existing
drainage pattern and ultimate downstream discharge in accordance with current flow control
standards .
2. Ollsite Analysis: Summarized in Section 3 -Off-site Analysis .
3. Flow Control: The project requires Level 1 (i.e., Basic) flow control according to the KCSWDM Flow
Control Map. The location of the site is in close proximity to Lake Washington with the discharge point
less than a half mile from the l 00-yr floodplain of Lake Washington. Therefore it qualifies for the
Direct Discharge Exemption per the requirements set forth in the KCSWDM section 1.2.3. l and the
City of Renton adopted version of the KCSWDM. A detailed description of the of the exemption and
calculations of runoff flow rates are provided in Section 4 -Flow Control and Water Quality Facility
Analysis and Design .
4. Conveyance System: The project proposes to collect on-site runoff and convey it to the proposed on-
site stormfilter vault at the northwest corner of the site. These improvements are shown in Figures 4
and 5 and are described further in Section 5 -Conveyance System Analysis and Design .
5. Erosion and Sediment Control: Temporary controls are as described in Section 8 -CSWPPP
Analysis and Design .
6. Maintenance and Operations: The on-site storm drainage facilities are proposed to be publicly
maintained. Refer to Appendix A of the King County Surface Water Design Manual for the
Maintenance Requirements .
7. Financial Guarantees and Liability: A Bond Quantity Worksheet will be prepared for this project
prior to the final engineering package. Approval and all financial guarantees will be provided by
the developer .
8. Water Quality: Basic Water Quality treatment is required for the proposed project. This treatment
level is to be achieved by means of a Stormfilter vault as shown on Figures 4 and 5 and as described
in Section 4 -Flow Control and Water Quality Facility Analysis and Design .
CPH Project No. 0 J 39-J5-001
CPIH CONSULTANTS
February 25, 2016
Page 9
'i
I
I
I
Senza Lakeview Preliminary Technical Information Report
KCSWDM Speciol Requirements
l. Other Adopted Area-Specific Requirements: No area-specific requirements apply to this project
site.
2. Flood Hazard Area Delineation: The limits of this project are not located within or in proximity to a
l 00-year floodplain.
3. Flood Protection Facilities: Not applicable.
4. Source Control: No additional source control is proposed.
5. Oil Control: The project is not considered a high~use area and no special oil control provisions are
required.
CPH Project No. 0139-15-001
CPIH CONSULTANTS
February 25, 2016
Poge 10
• • • • • • • • • • • • • • • • • :1
• • • • • • • • • • • • • • • • • • • • • • • • •
• • • , .
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Senza Lakeview Preliminary Technical Information Report
SECTION 3 -OFF-SITE ANALYSIS
Task I: Study Area Definition and Maps
The proposed proiect site is located at 397 Park Ave N in Renton, WA. The site is currently developed with
three single-family homes, a gravel driveway and various outbuildings. The existing ground cover consists
mostly of grass with various trees of varying age and health. The existing site topography consists of slopes
ranging from 0°/o to 15°/o. The existing site conditions are shown in Figure 3 .
The project site currently slopes and drains north and west to a ditch and catch basin at the intersection of
Lake Washington BLVD N and N 40'" St at the northwest corner of the site. The ditch gradually slopes north
along Lake Washington BLVD N. No water was observed in the ditch during the site visit and was lined with
grass. Once the runoff enters the existing conveyance system it flows northwesterly for approximately 540'
through a series of concrete pipes of varying sizes until it discharges into Lake Washington. The conveyance
system was observed to be in good working order and no indications of overtopping, excessive sediment
transport, or flooding was observed during our site visit .
Task 2: Resource Review
King County iMAP and the City of Renton (COR) Maps and GIS Data were reviewed to identify any potential
sensitive areas in the proximity of the project site .
• Wetlands: iMap does not identify any wetlands on the project site .
• Streams and l 00-year Floodplain: The project site is not located in the l 00-year floodplain.
• Erosion Hazard Areas: COR Maps identifies no erosion hazard areas on the project site •
• Seismic Hazard Areas: COR Maps identifies no seismic hazard areas on the project site .
• Coal Mine Hazard Areas: COR Maps identifies no coal mine hazard areas on the project site •
• Critical Aquifer Recharge Area: The project site is not located within a critical aquifer recharge area
per iMAP records
• Basin Condition: iMap indicates the majority of the site as a high basin condition. The southwest corner
of the project site is indicated as a low basin condition .
• Areas Susceptible to Groundwater Contamination: iMap does not show the project site as being
susceptible to groundwater contamination .
Tosk 3: Field Inspection
A field inspection was performed on Monday, January 25, 2016 on a sunny day with a temperature of
approximately 52 degrees. The site is currently developed with three single-family homes with landscaped
yards, a gravel driveway and various outbuildings. The majority of the site slopes west to a grass lined ditch
along the western boundary of the site along Lake Washington BLVD N. A small area along the northern
boundary of the site slopes northwesterly along N 4Q•h St to a catch basin at the intersection of N 4Q•h St and
Lake Washington BLVD N .
Onsite Drainage Basin
The existing topography of the site has slopes ranging from 0% to l 5% over most of its area. The project site
is comprised of a single drainage basin with surface runoff traveling primarily as sheet and shallow
concentrated flows over pervious areas. The drainage basin is comprised mostly of grass along with three
CPH Proiect No. 0139-15-001
CPIH CONSULTANTS
February 25, 2016
Page 11
Senza Lakeview Preliminary Technical Information Report
single-family homes, various outbuildings, landscaped areas and a gravel driveway. Based on visual
inspection during the site visit and survey contour data there are no low points where runoff can collect on site .
Task 4: Drainage System Description
Downstream Basin
Excess runoff from the drainage basin is conveyed north and west across the adjacent properties via sheet
flow until it reaches an existing ditch along Lake Washington BLVD N and o catch basin near the northwest
corner of the site. Flow from the ditch enters the catch basin at the intersection through a 62' long 18" concrete
pipe. The catch basin also receives overland flow from runoff along the north boundary of the site and N 40'"
St. The stormwater then flows north and west for approximately 1 25' through a series of 18" concrete pipes
with slopes ranging from 3.8% to 25% to a 49' long 24" DI pipe which conveys the flows west under an
existing BNSF railroad. Just west of the railroad the stormwoter discharges to a ditch for approximately 25'
before entering a 24" concrete pipe. From here the stormwater flows west and south through a series of 24"
and 30" concrete pipes with slopes ranging from 0.26% to 6.2% for approximately 340' before ultimately
discharging into Lake Washington approximately 540' downstream from the project site discharge point. A
downstream maps is shown in Figure 7.
Upstream Basin
Based on the site visit and information obtained from the previous Barbee Mill project it was determined the
project site drainage basin is at the downstream end of a larger basin. The upstream basin was analyzed to
determine the affect runoff could potentially hove on the project site. The total impervious area and overall
basin area were determined in order to calculate total runoff upstream of the proiect site. Based on the site
visit and survey contour data, surface runoff from the upstream basin does not flow onto the project site. The
upstream analysis is discussed further in Section 4 -Flow Control and Water Quality Facility Analysis and
Design. Total and impervious area information for the upstream basin can be obtained from Figure 6.
CPH Project No. 0139-15-001
CPIH CONSULTANTS
February 25, 2016
Page 12
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
-------------------------------------• • • • • • • • • ,.
le • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Senza Lakeview Preliminary Technical Information Report
SECTION 4 -FLOW CONTROL AND WATER QUALITY FACILITY
ANALYSIS AND DESIGN
The hydrologic analysis of the runoff conditions for this project is based on drainage characteristics such as
basin area, soil type, and land use (i.e., pervious vs. impervious) for the proiect site as well as areas upstream
of the project site. The upstream basin areas and locations were based off the drainage report generated for
the Barbee Mill Townhomes project. The Western Washington Hydraulic Model (WWHM) software was used
to evaluate the storm water runoff conditions for the project site ond upstream basins to verify that the
existing conveyance system could safely and efficiently convey flows downstream of the site. The following is
a summary of the results of the analysis and the proposed drainage facility improvements for this project .
Existing Site Hydrology
The existing site conditions are shown in Figure 3 of the Appendix. Existing site conditions within the area were
modeled based on the basin configurations summarized in Table 4.1 below. The Western Washington
Hydraulic Model (WWHM) software was used to model the existing site hydrology and calculate runoff peak
rates. The results of the existing site runoff analysis are provided in Appendix B .
Table 4. 1 -Land Use Cover, Existing Site Conditions
Basin ID Total Area (AC) Land Cover (AC)
Impervious Till Forest Till Grass
Site Basin 4.07 0.42 0.00 3.65
Additionally, historic site (i.e., fully forested) conditions would be considered in the analysis of the pre-
developed conditions for all on-site targeted developed surfaces in accordance with KCSWDM standards for
Basic Flow Control. However our project meets the exemption for flow control. The existing land use conditions
summarized in Table 4.2 are summarized for reference .
Table 4.2 -land Use Cover, Pre-Developed Site Conditions
Basin ID Total Area (AC)
Land Cover (AC)
Impervious Till Forest Till Grass
Site Basin 4.11 0 4.11 0
Bypass Basin 0.04 0 0.04 0
Additional Intake 0.07 0 0.07 0
Basin
Total 4.22 0 4.22 0
The basin site area totals 4.22 acres but includes a small 0.04 acre segment, delineated as Bypass Basin in
Figure 5 that will be bypassed due to the grades of the site. However, on additional 0.07 acres, delineated
as Additional Intake Basin in Figure 5 that is located off-site will be passed through the on-site facility and
treated for water quality. Any areas widening or improved were modeled as forest for existing conditions .
Input and output parameters for this model are provided in Appendix B of this report .
CPH Project No. 0139-15-001
CPIH CONSULTANTS
February 25, 2016
Page 13
Senza Lakeview Preliminary Technical Information Report
Developed Site Hydrology
The site is planned to be improved with roadway, storm drainage, and utility infrastructure in support of
seventeen (17) new single-family residences. Frontage improvements on Lake Washington BLVD N, N 40'' St
and Park Ave N will be completed in accordance with city road standards as conditions with the preliminary
plat approval.
The developed site drainage is contained within one basin. The developed conditions of the site were
modeled using the WWHM modeling software. All roods, building roof drains, on-site paved surfaces and
most landscape areas on the site are collected and directed to the on-site water quality stormfilter. Due to the
existing topography and roadway grades, a small portion of runoff from Lake Washington BLVD will be
bypassed. However, as discussed in the Existing Conditions section and later in the Water Quality section, a
treatment trade is used to negate this bypass area.
Fully developed conditions were modeled using measured and land cover standards established by the
current Zoning Code, which states that all lot areas are assumed to be 55% impervious and 45% gross.
The impervious and pervious areas for all other areas were calculated directly by measuring the new roods
and sidewalks as impervious and grass areas as pervious.
In order to utilize the Direct Discharge Exemption per the requirements set forth in the KCSWDM section
1 .2.3. 1 the basins upstream and downstream of the project site were analyzed to determine flow rotes for
the developed project. The upstream basin areas and locations were based off the drainage report
generated for the Barbee Mill T ownhomes project which is located a few hundred feet northwest of the
project site. From the Barbee Mill report it was determined that 24 acres upstream of the project site
delineated as Basin A and 0.47 acres just downstream of the project site delineated as Basin B utilize the
some conveyance system the subject project will discharge. Existing developed conditions were modeled using
measured and land cover standards established by using Tobie 3.2.2.D of the 2009 KCSWDM. The upstream
basin, Basin A was divided into 4 sub-basins to more accurately determine the dwelling unit densities. These
densities were determined by dividing the number of dwelling units by the basin area. A portion of Basin B is
within a BNSF R.O.W and o portion is with the Loke Washington BLVD N right-of-woy as no dwelling units are
present. The sub-basin information is summarized in table 4.3 below:
Table 4.3 -Land Use Cover, Existing Upstream Developed Conditions
Basin ID
Project Basin
Basin A,
Basin A,
Basin Al
Basin A•
BNSF Bosin
CPH Proiect No. 0139-15-001
CPIH CONSULTANTS
Total Area
(AC)
4.42
4.89
9.99
10.70
3.31
0.78
DU/GA
6.00
3.24
4.10
3.08
4.53
0.00
%
Impervious
55
36
43
35
46
40
February 25, 2016
Poge 14
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Senza Lakeview Preliminary Technical Information Report
The results of the developed site runoff analysis for the project site and upstream basins are summarized in
Tobie 4.4 and more detailed results ore provided in Appendix C.
Table 4.4 -Runoff Volumes
Basin 100-yr Flowrate (cfs)
Project Basin 2.72
Basin A 16.86
BNSF Basin 0.42
A summary of the land use areas used to model Basins A and B is shown in Figure 6 .
Flow Control
The project site qualifies for the Direct Discharge Exemption per the requirements set forth in the KCSWDM
section l .2.3. l. Backwater analysis was performed using AutoDesk Storm and Sanitary Analysis (SSA) to
determine the effects on the existing stormwater system as a result from the added impervious areas from the
project site. It was determine that the existing stormwoter system con safely and effectively convey the
increased runoff for the 1 00-yr storm event generated by the additional imperious areas from the project site
without overtopping. As a result, no flow control facilities are proposed for this proiect and the runoff with
discharge directly to Lake Washington .
Water Quality Design
The KCSWDM requires that all proposed projects assess the requirement to provide water quality facilities to
treat runoff of pollution-generating impervious surfaces. Storm drainage runoff from pollution generating
impervious surfaces (PGIS) will require Basic Water Quality treatment prior to discharge to the downstream,
off-site system. This treatment level is proposed to be achieved by a Stormfilter vault located at the northwest
corner of the proiect site .
Basic treatment facilities are required with the developed project site. Due to the existing topography and
roadway grades, a small portion of runoff from Lake Washington BLVD will be bypassed. However, to offset
this untreated area, the site will be treating a larger runoff area from existing previously untreated pavement
along N 40'" St. Section l .2.8.2( in the COR Addendum to the KCSWDM discusses treatment trades and
water quality treatment. This addendum states that runoff from the target surface may be released
untreated if an existing non-target surface of similar size and pollutant characteristics is treated on the site .
The bypass area, shown as Basin B in Figure 5 of the Appendix, is 0.04 acres. The previously untreated are
along N 401h St is shown as Basin C in Figure 5 of the Appendix, amounts to 0.07 acres .
The developed land use conditions displayed in Table 4.5 were used as the developed site conditions for the
WWHM model and shown in Figure 5 of the Appendix. A summary of the impervious and pervious area
calculations for the site is also provided in Appendix C.
CPH Project No. 0139-15-001
CPIH CONSULTANTS
February 25, 2016
Page 15
Senza Lakeview Preliminary Technical Information Report
Table 4.5 -Land Use Cover, Developed Conditions
Basin ID Land Cover (AC) Total Area (AC)
Impervious Till Forest Till Grass
Site Basin 4.11 2.17 0 1.94
Bypass Basin 0.04 0.04 0 0
Additional Intake 0.07
Basin
0.07 0 0
Total 4.22 2.28 0 1.94
A summary of the stormfilter vault parameters are provided in Appendix D of this report.
CPH Proiect No. 0 J 39-15-001
CPIH CONSULTANTS
February 25, 2016
Page 16
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • i el
• • • • • • • • • •
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Senza Lakeview Preliminary Technical Information Report
SECTION 5 -CONVEYANCE SYSTEM ANALYSIS AND DESIGN
Conveyance analysis far the project was performed in accordance with Chapter 4 of the KCSWDM which
requires that new and existing pipe systems be designed with sufficient capacity to convey and contain at
minimum the 25 year peak flow. The existing offsite conveyance system was analyzed to contain runoff rates
generated by a l 00 year storm event. The analysis begins at an existing catch basin at the corner of Lake
Washington BLVD N and N 40th St. This catch basin is where flows from the project site and flows from the
upstream basins combine into the existing conveyance system. The analysis terminates at the end of the
existing ditch west of the BNSF railroad prior to entering the conveyance system constructed for the Barbee
Mill project. Analysis beyond this point can be obtained from the as-built Barbee Mill Technical Information
Report. The design flow rate far conveyance/backwater analysis is based on peak flow rates calculated using
AutoDesk Storm and Sanitary Analysis which utilizes the Rational Method. Developed conditions far improved
tributary areas and existing conditions for any off~site tributary areas were used for input parameters. Refer
to Appendix E of this report for the backwater analysis •
Surface water collection and conveyance for the project is proposed by means of grading, grated inlets, and
below grade pipes. The collection system is composed of roof drains, catch basins, and piping that discharges
all water into a stormfilter vault. Stormwater from the vault will discharge to an existing manhole at the
southeast corner of the Lake Washington BL VD N and N 4Qth St intersection .
The storm drainage conveyance systems ore illustrated in Figures 4, and 5. Appendix E contains the
supporting conveyance backwater analysis .
CPH Project No. 0139-15-001
CPIH CONSULTANTS
February 25, 2016
Page 17
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Senza Lakeview Preliminary Technical Information Report
SECTION 6 -SPECIAL REPORTS AND STUDIES
Geotechnical Report prepared by Earth Solutions, Inc., September 17, 201 5
CPH Proiect No. 0139-15-001
CPIH CONSULTANTS
Februory 25, 2016
Page 18
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Senza Lakeview Preliminary Technical Information Report
SECTION 7 -OTHER PERMITS
Construction and Grading Permits will be obtained from the City of Renton for roadway, storm drainage, and
sanitary sewer improvements proposed for the infrastructure serving the subdivision .
The project will also require a NPDES General Construction Stormwater Permit from the Washington State
Department of Ecology to discharge stormwoter during construction .
Preliminary Plat Approval will be obtained from the City of Renton to establish the layout of the land division
and to ensure the proposed plat is in accordance with COR adopted standards .
Individual building permits will be required for the on-site walls and the individual home structures .
CPH Proiect No. 0139-15-001
CPIH CONSULTANTS
February 25, 2016
Page 19
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Senza Lakeview Preliminary Technical Information Report
SECTION 8 -CSWPPP ANALYSIS AND DESIGN
Site specific details and provisions for the temporary erosion and sediment control (ESC) facilities are
provided with the improvement plans that accompany this TIR. The proposed facilities have been selected
and sized in accordance with the recommendations provided in the KCSWDM standards. In addition to the
site-specific ESC measures, the following general Best Management Practices (BMPs) for sediment control shall
also be implemented in accordance with the provisions of the KCSWDM,
1. Clearing Limits
Construction clearing limits fence or silt fence will be installed by the contractor along the entire
project corridor to prevent disturbance of project areas not designated for construction. These
fences will be installed prior to clearing and grading activities where appropriate .
2. Cover Measures
Temporary and permanent cover measures will be provided by the contractor to protect
disturbed areas. Disturbed areas will be seeded and mulched to provide permanent cover
measure and to reduce erosion within seven days, if those areas not scheduled for immediate
work .
3. Perimeter Protection
The contractor will install silt fences as indicated on the drawings prior to any up slope clearing,
grading and trenching activities in order to reduce the transport of sediment offsite .
4. Traffic Area Stabilization
Stabilized pads of quarry spoils will be installed by the contractor at all egress points from the
project site as required to reduce the amount of sediment transported onto paved roads or other
offsite areas by motor vehicles. It is not anticipated that a construction entrance will be required
given the existing roadway •
5. Sediment Retention
Sediment retention will be provided by silt fencing and catch basin inlet protection at the
locations and dimensions shown on the project drawings .
6. Surface Wafer Control
Surface water control will include ditches, temporary culverts, check dams, and/or other inlet and
outlet protection at the locations and dimensions shown on the drawings .
7. Dust Control
Water and/or street sweeping equipment will be used by the contractor to control dust emissions
during construction operations .
8. Wet Season Requirements
If soils are exposed during the period of October l to March 31, the contractor will mulch and
seed or otherwise cover as much disturbed area as possible by the first week of October, in
order to provide protective ground cover for the wet season. The contractor will also conform to
the following wet season special provisions:
CPH Project No. 0139-15-001
CP[H CONSULTANTS
February 25, 2016
Page 20
Senza Lakeview Preliminary Technical Information Report
A. Apply cover measures to disturbed areas that are to remain unworked for more than two
doys.
B. Protect stockpiles that ore to remain unworked for more than 1 2 hours. No area is to be
left uncovered/denuded longer than 12 hours during the winter months.
C. Provide onsite stockpiles of cover materials sufficient to cover all disturbed areas.
D. Seed all areas that are to be unworked during the wet season by the end of the first
week of October.
E. Apply mulch to all seeded areas for protection.
F. Provide onsite storage of 50 linear feet of silt fence (and the necessary stakes) for every
acre of disturbed area. Straw bales are to be stockpiled onsite for use in an emergency.
G. Provide construction rood and parking lot stabilization areas for all sites.
H. Provide additional sediment retention as required by the City of Renton Engineer.
I. Provide additional surface water controls as required by the City of Renton Engineer.
J. Implement construction phasing and more conservative BMPs for construction activity near
surface waters (to be evaluated).
K. Review and maintain TESC measures on a weekly basis and within 24-hours after any
runoff-producing event.
9. Sensitive Areas Restrictions
No sensitive areas ore located on-site.
l 0. Maintenance Requirements
All ESC measures will be maintained and reviewed on a regular basis following the standard
maintenance requirements identified in the project drawings. An ESC supervisor will be
designated by the contractor and the name, address and phone number of the ESC supervisor will
be given to the City prior to the start of construction. A sign will be posted at the primary
entrance to the project site identifying the ESC supervisor and his/her phone number.
The ESC supervisor will inspect the site at least once a month during the dry season, weekly during
the wet season, and within 24 hours of each runoff-producing storm. A standard ESC maintenance
report will be used as a written record of all maintenance.
The contractor will be responsible for phasing of erosion and sediment controls during construction
so that they ore coordinated with construction activities. The contractor will also be responsible for
maintenance of temporary controls during construction, including removal of accumulated
sediment, and for the removal of the controls and remaining accumulated sediment at the
completion of construction.
11. Final Stabilization
Prior to obtaining final construction approval, the site shall be stabilized, the structural ESC
measures removed and drainage facilities cleaned. To obtain final construction approval, the
following conditions must be met:
• All disturbed areas of the site should be vegetated or otherwise permanently stabilized
in accordance with project BMPs. At a minimum, disturbed areas should be seeded and
mulched to provide a high likelihood that sufficient cover will develop shortly after final
approval. The plans include erosion control notes and specifications for hydro-seeding
and mulching disturbed areas.
• Structural measures such as silt fences, pipe slope drains, storm drain inlet protection and
sediment traps and ponds shall be removed once the proposed improvements are
CPH Project No. 0139-15-001
CPIH CONSULTANTS
February 25, 2016
Page 21
• • • • • • • • • • • • • • • • • •1 • • • • • • • • • • • • • • • • • • • • • • • • • •
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Senza Lakeview Preliminary Technical Information Report
complete and vegetated areas are stabilized. All permanent surface water facilities shall
be cleaned completely and restored to working order prior to removal of ESC facilities .
CPH Project No. 0139-15-001
CPIH CONSULTANTS
February 25, 2016
Page 22
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Senza Lakeview Preliminary Technical Information Report
SECTION 9 -BOND QUANTITIES, FACILITY SUMMARIES, AND
DECLARATION OF COVENANT
All required bonds, facility summaries, and covenants will be provided prior to final approval.
CPH Proiect No. 0139-15-001
CPIH CONSULTANTS
February 25, 2016
Page 23
• • • ,.
I •
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Senza Lakeview Preliminary Technical Information Report
SECTION 10 -OPERATIONS AND MAINTENANCE MANUAL
The on-site storm drainage conveyance facilities for this project will be publicly maintained by the City of
Renton. The combined detention/water quality facility will be privately maintained and designed in
accordance with KCSWDM. A site specific operations and maintenance manual for the private facilities will be
completed prior to final recording .
CPH Project No. 01 39-15-001
CPIH CONSULTANTS
February 25, 20 l 6
Page 24
,--------------------------
1 e
le
I•
I• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
CPH
CONSULTANTS
FIGURES
Site Planning
Civil Engineering
Project Management
Land Development Consulting
~------------------·-----------
"\ol:> All NOISl/13!> 31\fO "ON
NOWNIHSVM 'A!Nno:> 8Nl\ol N01N31:1 ~O Ail:> ~ ~lihi "" _,. ~ ~1 SN0/1/0NOJ DN/1SIX3 ~~ M • w -· ~ 0:: ~
39\/Nl\/i:IG ON\/ '!JNIG\/i:/9 ,WMG\/Oi:I :::, . ~ ~-~HI oE I :::, ~I w~ (!) o.." UzH§, "'~ ~u:::: 8 M31J\3}tv1 v'ZN3S s () 0 oU" I I • -" a u 1, u
S9f 88 llll ~l!IINl~ll3lld 9T/9l/l
g ~ • • • s f !2 ! -@g ~;; ~· u "
I, ~ ol ~
0
. " ~~:i
••••••••••••••••••••••••••••••••••••••••••••
Sil( 88
"\D A8
~~",,,
·~,,.
~IU~\INIV'!ll3~d 9J;/9lll l
NOIS1/\3l::I 31V<l 'ON
~~
'·~~
*,~'
'~, ·~
N018NIHS\IM 'AfNnOJ 8NIJ.i N01N31:1 ~O Afl:'.J
SN0/1/0NOJ 31/S 03d013A30
39\INl\lt/Q ON\/ '9NIO\lt/9 ,,\ \IMO'v'Otl
M31A3).l'v'l 'v'ZN3S
i •
<.)
~
~
i':
5
0 w
a_
; ~ a
I~
0
••••••••••••••••••••••••••••••••••••••••••••
/ ;-
;'
;··
;·
.• /'
/
BYPASS BASIN ----
/ /~
~
""" ·"'"
.l' •.
'~! #'~ .~
~//;"0
, d
i;' i
2
a
I
3342700410 3342700412
EXIS11NG 5/1£ CONDITIONS
l»ID co~ (AC}
BASIN ID TOTAL AREA /IIPERYIOUS nil FOREST (AC)
SITE BASIN 4.07 0.42 0.00
------SD --SO
3"342700·1!4 3342700478
SW 1/4, NW 1/4, SEC.32, TWP.24N., RGE. 5E., W.M.
-322t.059036
' -~=-:L.'_
I
ADDITIONAL INTAKE
BASIN
3~3
--·----;.;~.g I N88·49·21~N 45'.,,47' --
'~~~· -1.AZ! ~~
j224()59045
IF -~-1--
,
( t" . ~-=i-.. -r-,..11, -----------...... _____ r .. --
SITE BASIN ( :: . :i;
\ ,,/ .
,--"-----. / / ,1 ., •· \ ',._ // / ' ., .
-----=-,-/
I n• y
I fr-;; . .,.,;-'°'" ,/ /t3iStl ! / 1'\; I' I I If" _ £1 '-, c:::: ~ I I 11 iJJ:jf-~*'-
1 ~.~
J342700405
PRE-DE',UOFW SITE CONOOIONS Da"ELOP£l> 511£ CONMJONS
LANO CO~ (AC) T LAND CO'vER (AC)
ru GRASS BASIN !O j TOTAL ARfA
(AC) IIIPER'.10US 111.L F0R£ST 1li1. GRASS BASIN ID TOTtc)EA [ 111PfRY10US T 111.1 FOREST I nu GRASS
J.65 SITE BASIN 4.11 0.00 4.!! 0.00 SITE BASIN 4.11 I 2.17 I 0.00 I 1.94
BYPASS BASIN 0.04 0.00 0.04 0.00 BYPASS BASIN 0.04 ! 0.04 I 0.00 r 0.00
AD0/1/0NAf INTAKE BASIN 0.07 0.00 0.07 0.00 ,'.[)0/TIONAf INTAKE BASlN 0.07 I 0.07 I 0.00 I 0.00
10TAL 4.22 0.00 4.22 0.00 TOTAf 4.22 ! 2.2B l 0.00 I 1.94
®
15 I~
~lgj
'I~ ~ i
G'.i a " .
ill
g
~
LU
> LU
::s:::
::5
<(
N z
LU
Cf)
CUENT
LU
CD
~
ri q
q
2:
<,:
~
q <11
~ ~
CD c1i
:,... "' ~ ~ q ;;,
<,: 0:
0 a
0:
ICAP EQUITY, LLC
3535 FACTORIA BLVD SE
SUITE #500
BELLEVUE.WA 98006
PHONE: (425) 278-9030
z
~
~
0
5
CPIH
CONSULTANTS
SitePl&'ln:ng • Civil [ngioeering
LlidL'.eCor&tul,g. Pro,octManagerr,ent
114311'--·~-·21)
-'11•98051
-:~12&2390ifl>::;<2S,l'M-2389
n•.<D'<ons,lt8'to.eo,o
0 30 601.,,~-------~
--PROJECT NO
PL.AN IN FEET 0139,15-001
~ CALL Bl!FORI! I DRAWING
YOU DOG I FIGURE 5
1-800-424-55SS
S~EET_l_o,_l_
c...,,,,.,,o:io,o=em.su,.,.,..u.c,.~~-
SW 1/4, NW 1/4, SEC.32, TWP.24N., RGE. SE., W.M.
I~
I / I -----=;i -~-, 0;: -----iTr= '· , I -
1 BNSE.BASIN: 47AC // I ""'",tr.,.~" I I
" ro,~"":,:.,.,""" / "'"""''"'~" 1: ro;:~VIOUSAREA:4.30, C .J !----. IMPE:!':s:o.4?AC-/ TOTALAR:'Jii~:2.43AC ~ ~~tGRASS:s.69 .,. V I
I
I ~-__JI
= -. '" '
,, / / TILL GRASS, 1..9 Ir/ -I. , I
1-----~/ __,,y--w -------fj I .~
--~ I I f
$ I i I ~.i7 BAS/NifA-4B9AC I
t"l TOT~LA s·iREA·1.76AC I w / ~ // IMPERVIOU 'I . '----
! =·"'"'" ! I\ ---.-~ ---B
/ ---:t;-c I , N38THSTRm_ --I
z ____ /__ / -//_ I
I
I · -"""~-,, "" I
I
TOTAL , ·AREA:3.75AC "--I IMPE~~'f.,U:. i, oc .,. I I TIii
L 11 \ I ~I / / / [_ I 1,------i'
I ! m= 1 1 I
'" I
N36THSTREET .,----~---i r-F _ _ _ I
I BASl/'J.flR~-331 1~ __ . Ai
1
1 1 TOTAL,. · . ·l1.:>.,I.AC ~
IMPERVIOUS AREA.' I I ---1,--· 1..79 AC Lt TILL GRASS.
-----1
'-,~
N 36TH STREET
®
~n~
~l&i
" 'I' 0 ,
ii, :,::
~ a " .
"I~ ~ ~
Cl~
0 z
LU
('J
~
~ q
q
3:: ~ LJ.J .
-('J > ?; LJ.J q U)
'-/ <,: ~
~ a:: U)
<( ('J al
_J >-:;
<( ~ ~ z N a ;:n ~
Z <:(o...~ 0 ::) :: LJ.J a:: 0 en §
CLIENT
ICAP EQUITY, LLC
3535 FACTOR!A BLVD SE
SUITE lt500
BELLEVUE.WA 98006
PHONE: (425) 278-9030
CPIH
CONSULTANTS
511ePlann,f111 • Civil Eii1neering
la~UseCOrwllin&• Projed.~
l1"31VI-IIO.!E.S..120 _, .. \li!llS2
Ptv,e-,<2S1m2m1,1..1:,.•2Siml389
~••·""'°''"l"'"·'•m
w----:= PF!OJECT NO
o 100 200
1
I
PLAN IN FEET oi39-15-001
~ CA~~~::RI! I DRAWIFIGURE 6
~ 1-800-424-5555 1----------
SHEET_l_o,_l_
"""""'"''°10,0r;:,,<""""-u.c. ........ -
•--------------------~---------------------------, • • • • • • • • • • • • • • • • • • • • •
0
WGS_1984_Web_Mercator_Auxiliary_Sphere
64
C ity of Renton Print map Template
128 Feet RentonMapSupport@Rentonwa.gov
03/03/2016
This map is a user generated static output from an Internet mapping site and
is for reference only . Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
T HIS MAP IS NOT TO BE USED FOR NAVIGATION
Legend
City and County Boundary
'I L-Other
-·, l..; City of Renton
Addresses
r Parcels -Network Structures
a Inlet
0 Manhole
• Utility V ault
• Unknown Structure • Control Structure • Pump Station
, . Discharge Point • Water Quality
Detention Facilities
"' Pond • Ta nk
• Vault
i Weijand -Pipe -Culvert -Open Drains
-Virtual Drainline • Facility Outline
Private Network Structures
Inlet
0 Manhole
C Utility V ault
II Unknown Structur e
• Private Control Structure ,. Private Discharge Point
e Private Water Quality
Private Detention Facilities
'd Pond
0 Tank
• Vault . , Wetland ..:£L -Private Pipe -Private Culvert -Private Open Drains • Private Facil ity Outline -
Notes
None
0
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
CPH
CONSULTANTS
APPENDIX A
NRCS SOILS REPORT
Site Planning
Civil Engineering
Project Monogement
Land Development Consulting
;o,:•• I ....
--
: ... ~ ~
N 40th St
.. ~ -.......~. ~ , ...
-
0(:-
,.u
~
~
:...
.,...<:-
~
~
$
c:,
-
~~
.,. *fl, ~ v --z <i
Cl> >
<I:
-! -~ -Q. --~ ~
--
-.. • I
.
I
~ .
~
•• I •• I .... I .... ... . ... . .... ..... .. I
:.:.
:.1:. .. 'I ... II
C'I:':• .. '. , .. I
. . . . -. . I . . ... . . .. . -.
Soil Map-King County Area , Wash1ngton
MAP LEGEND
Area of Interest (AOI) Isl Spoil Area
D Area of Interest (AOI) 0 Stony Spot
Soils 0) Very Stony Spot D Soil Map Unit Polygons
~ Wet Spot
,,.,; Soil Map Unit lines
Other 6 • Soil Map Unit Potnts
Special Line Features •• Special Point Features
Water Features w Blowout
Streams and Canals -ml Borrow Pit
Transportation • Clay Spot
H+ Rails
0 Closed Depression _,_ Interstate Highways
~ Gravel Pit _,_ US Routes ... Gravelly Spot ,:::;:,:; Major Roads
0 Landfill Local Roads
A. Lava Flow Background ... Marsh or swamp • Aenal Photography
~ Mine or Quarry
0 Miscellaneous Water
0 Perennial Water
'V Rock Outcrop
+ Saline Spot ... Sandy Spot .. -Severely Eroded Spot
0 Sinkhole
~ ShdeorShp
/JI SodicSpot
MAP INFORMATION
The soil surveys that comprise your AOI were mapped at 1 :24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil line
placement. The maps do not show the small areas of contrasting
soils that could have been shown at a more detailed scale .
Please rely on the bar scale on each map sheet for map
measurements .
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: http://websoilsurvey .nrcs.usda.gov
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection , should be used if more accurate
calculations of distance or area are required .
This product is generated from the USDA-NRCS certified data as of
the version date(s) listed below .
Soil Survey Area :
Survey Area Data :
King County Area , Washington
Version 11 , Sep 14, 2015
Soil map units are labeled (as space allows) for map scales 1 :50,000
or larger.
Date(s) aerial images were photographed : Aug 31 , 2013--0ct 6,
2013
The orthophoto or other base map on which the soil lines were
compi led and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor shifting
of map unit boundaries may be evident.
~ Natural Resources Web Soil Survey 1/22/2016
Conservation Service National Cooperative Soil Survey Page 2 of 3 ••••••••••••••••••••••••••••••••••••••••••••
• • • • 1: • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Soil Map-King County Area, Washington
Map Unit Legend
AgC j Alderwood gravelly sandy loam, I 1.41 33.4%.
8 to 15 percent slopes .
lnC ---ndianola loamy sand, 5 to 15 I 2.71 66.6%
percent slopes
iT~t;,; ti ,;,;;~,-1~t~;;; -----------. -]______ --4~1--100.oo/~]
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/22/2016
Page 3 of 3
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
CPH
CONSULTANTS
APPENDIX 8
WWHM REPORT
Site Planning
Civil Engineering
Project Management
land Developmenl Consuhing
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
General Model Information
Project Name: Existing Site
Site Name: Kennydale
Site Address:
City: Renton
Report Date: 2/24/2016
Gage: Seatac
Data Start: 1948/10/01
Data End: 2009/09/30
Timestep: 15 Minute
Precip Scale: 1.00
Version: 2015/01/08
POC Thresholds
Low Flow Threshold for POC1:
High Flow Threshold for POC1:
Existing Site
50 Percent of the 2 Year
50 Year
2/24/2016 10:39:57 AM Page2
•
Landuse Basin Data • • Predeveloped Land Use • Existing Conditions • Bypass: No •
Groundwater: No • • Pervious Land Use Acres • C, Lawn, Mod 1.46
C, Lawn, Steep 2.19 •
Pervious Total 3.65 • • Impervious Land Use Acres • PARKING MOD 0.42 • Impervious Total 0.42 • Basin Total 4.07 • • Element Flows To: • Surface lnterflow Groundwater • • • • • . , .,
•I • • • • • • • • • • • • • • • • risting Site 2/24/201610:39:57 AM Page 3 • •
• • • Mitigated Land Use
• Developed Conditions • Bypass: No • GroundWater: No • • Pervious Land Use Acres
C, Lawn, Mod 1.83 • • Pervious Total 1.83
• Impervious Land Use Acres • PARKING MOD 2.24
• Impervious Total 2.24 • • Basin Total 4.07
• Element Flows To: • Surface lnterflow Groundwater • • • • • • • • • • • • • • • • • • • • • • • • • • Existing Site 2/24/2016 10:39:57 AM Page4
•
Routing Elements
Predeveloped Routing
risting Site 2/24/201610:39:57 AM Page 5
• • • • • • • • • • • • • • •• I • •I • • • • • • • • • • • • • • • • • • • • • • • • • • •
Analysis Results
POC 1
. ' " . ~-···::: ....
"'
i
! " • • '~?+~H--~~--11
+H-,..+ ..... . . ...
l--'-------------'"
UIJ 5 10 ZIJll'.l~!Qm 110 ••• 901
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area: 3.65
Total Impervious Area: 0.42
Mitigated Landuse Totals for POC #1
1Total Pervious Area: 1.83
~otal Impervious Area: 2.24
Flow Frequency Method: Log Pearson Type 111178
I
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.572704
5 year 0.890069
10 year 1.126302
25 year 1 .453092
50year 1.716556
100 year 1.996886
I
F,low Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 1 .132872
5 year 1.48818
1:0 year 1. 7 42142
2.5 year 2.085095
5.0 year 2.357094
100 year 2.643666
Jnnual Peaks
Ahnual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 1.034 1.597
1950 1.001 1.401
1951 0.560 0.934
1952 0.300 0.708
1953 0.258 0.804
1954 0.455 0.920
1955 0.434 1.064
1956 0.567 0.920
1957 0.656 1.144
1958 0.389 0.891
E 1. S xrng ,te 2/24/201610:39:57 AM Page 7
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •• I • • •
1• 1• 1• 1959 0.346 0.898
1960 0.624 1.054 !• 1961 0.451 0.958 • 1962 0.251 0.761
1963 0.544 1.013 • 1964 0.503 0.884 • 1965 0.700 1.176
1966 0.353 0.793 • 1967 1.010 1.477 • 1968 0.766 1.739
1969 0.655 1.075 • 1970 0.532 1.049 • 1971 0.624 1.281
1972 0.929 1.356 • 1973 0.262 0.722 • 1974 0.652 1.240
1975 0.707 1.160 • 1976 0.505 0.977 • 1977 0.462 0.946
1978 0.562 1.241 • 1979 0.409 1.514 • 1980 1.301 1.970
1981 0.501 1.080 • 1982 1.041 1.641 • 1983 0.647 1.212
• 1984 0.347 0.815
1985 0.484 1.044 • 1986 0.568 0.960
• 1987 0.530 1.354
1988 0.238 0.859 • 1989 0.259 1.345
• 1990 1.871 2.333
1991 1.331 1.890 • 1992 0.445 0.863
• 1993 0.253 0.945
1994 0.196 0.811 • 1995 0.397 0.968
• 1996 0.985 1.386
1997 0.605 1.082 • 1998 0.546 1.068 • 1999 1.458 2.455
2000 0.588 1.086 • 2001 0.358 1.194
• 2002 0.874 1.419
2003 0.882 1.457 • 2004 1.273 2.330 • 2005 0.527 0.907
2006 0.531 0.880 • 2007 1.738 2.227 • 2008 1.263 1.760
2009 0.747 1.421 • Ranked Annual Peaks • Ranked Annual Peaks for Predeveloped and Mitigated. POC#1 • Rank Predeveloped Mitigated • 1 1.8710 2.4553
2 1.7383 2.3325 • 3 1.4577 2.3298 • • Existing Site 2/24/201610:40:51 AM Pages
•
• • 4 1.3309 2.2265 • 5 1.3010 1.9701
6 1.2733 1.8899 • 7 1.2626 1.7595 • 8 1.0412 1.7387
9 1.0338 1.6406 • 10 1.0098 1.5968 • 11 1.0011 1.5138
12 0.9848 1.4773 • 13 0.9288 1.4572 • 14 0.8824 1.4210
15 0.8739 1.4194 • 16 0.7658 1.4013 • 17 0.7471 1.3858
18 0.7075 1.3561 • 19 0.6998 1.3538 • 20 0.6556 1.3449
21 0.6545 1.2811 • 22 0.6525 1.2412 • 23 0.6474 1.2402
24 0.6240 1.2121 • 25 0.6236 1.1943 • 26 0.6047 1.1765
27 0.5881 1.1602 • 28 0.5681 1.1435 • 29 0.5675 1.0864
30 0.5618 1.0825 • 31 0.5605 1.0801 • 32 0.5459 1.0751
33 0.5436 1.0676 • 34 0.5323 1.0637 • 35 0.5307 1.0542
36 0.5302 1.0486 .,
'37 0.5265 1.0442 • 138 0.5052 1.0134
39 0.5031 0.9765 • !4o 0.5014 0.9680 • 41 0.4841 0.9602 • 42 0.4618 0.9576
43 0.4549 0.9457 • 44 0.4512 0.9448 I • 15 0.4452 0.9345
16 0.4345 0.9200 • 47 0.4088 0.9200 • 48 0.3972 0.9070
49 0.3892 0.8978 • 50 0.3585 0.8910 • 51 0.3532 0.8839
52 0.3473 0.8800 • 53 0.3457 0.8628 • 54 0.3003 0.8595
55 0.2619 0.8149 • 5.6 0.2588 0.8110 • 57 0.2582 0.8040
58 0.2533 0.7934 • 59 0.2511 0.7613 • 60 0.2384 0.7216
6h 0.1956 0.7076 •
ELiing Site • 2/24/201610:40:51 AM Page 9 • I •
• • Duration Flows • • Flow(cfs) Predev Mit Percentage Pass/Fail • 0.2864 1212 9439 778 Fail • 0.3008 1048 8408 802 Fail
0.3152 878 7383 840 Fail • 0.3297 742 6652 896 Fail • 0.3441 634 5843 921 Fail
0.3586 551 5215 946 Fail • 0.3730 480 4673 973 Fail • 0.3875 430 4194 975 Fail
0.4019 382 3764 985 Fail • 0.4164 329 3356 1020 Fail • 0.4308 302 3035 1004 Fail
0.4453 271 2699 995 Fail • 0.4597 248 2460 991 Fail • 0.4742 231 2224 962 Fail
0.4886 213 2016 946 Fail • 0.5030 195 1830 938 Fail • 0.5175 178 1663 934 Fail
0.5319 161 1528 949 Fail • 0.5464 145 1402 966 Fail • 0.5608 137 1289 940 Fail
0.5753 122 1190 975 Fail • 0.5897 114 1095 960 Fail • 0.6042 107 1013 946 Fail
0.6186 102 943 924 Fail • 0.6331 93 862 926 Fail .I 0.6475 92 795 864 Fail
0.6620 84 727 865 Fail • 0.6764 79 678 858 Fail • ,0.6909 74 606 818 Fail
Ki~g~ 69 574 831 Fail • 67 536 800 Fail • 0.7342 65 504 775 Fail
b.7486 63 472 749 Fail • b.7631 58 442 762 Fail • iJ.7775 54 418 774 Fail
0.7920 52 399 767 Fail • 0.8064 51 375 735 Fail • 0.8209 47 355 755 Fail • 0.8353 47 330 702 Fail
0.8498 43 312 725 Fail • d.8642 43 289 672 Fail
d.8787 40 270 675 Fail • ci.8931 37 251 678 Fail • d.9076 37 236 637 Fail • o'.9220 36 220 611 Fail
Ol9364 34 210 617 Fail • 0[9509 32 192 600 Fail • 0!9653 28 185 660 Fail
0!9798 27 170 629 Fail • 0!9942 24 168 700 Fail • 1.'0087 22 162 736 Fail
1.'0231 21 151 719 Fail • 1.0376 20 148 740 Fail • 1.0520 17 141 829 Fail
I • Exi\sting:ite 2/24/201610:40:51 AM Page 11 • •
----------------------------------------• • • 1.0665 17 134 788 Fail
• 1.0809 17 128 752 Fail
1.0954 17 120 705 Fail • 1.1098 16 116 725 Fail • 1.1242 16 111 693 Fail
1.1387 16 111 693 Fail • 1.1531 16 106 662 Fail
• 1.1676 15 101 673 Fail
1.1820 15 98 653 Fail • 1.1965 14 93 664 Fail • 1.2109 14 88 628 Fail
1.2254 13 84 646 Fail • 1.2398 12 80 666 Fail • 1.2543 12 74 616 Fail
1.2687 10 69 690 Fail • 1.2832 9 64 711 Fail • 1.2976 8 63 787 Fail
1.3121 7 61 871 Fail • 1.3265 7 58 828 Fail • 1.3409 6 54 900 Fail
1.3554 6 52 866 Fail • 1.3698 6 48 800 Fail • 1.3843 6 46 766 Fail
1.3987 6 44 733 Fail • 1.4132 5 40 800 Fail • 1.4276 5 38 760 Fail
1.4421 4 38 950 Fail • 1.4565 4 35 875 Fail • 1.4710 3 31 1033 Fail
1.4854 3 29 966 Fail • 1.4999 2 29 1450 Fail • 1.5143 2 25 1250 Fail
1.5288 2 23 1150 Fail • 1.5432 2 23 1150 Fail • 1.5576 2 23 1150 Fail
1.5721 2 23 1150 Fail • 1.5865 2 23 1150 Fail • 1.6010 2 22 1100 Fail
1.6154 2 21 1050 Fail • 1.6299 2 20 1000 Fail • 1.6443 2 19 950 Fail
1.6588 2 19 950 Fail • 1.6732 2 18 900 Fail • 1.6877 2 17 850 Fail
1.7021 2 17 850 Fail • 1.7166 2 17 850 Fail • The development has an increase in flow durations • from 1 /2 Predeveloped 2 year flow to the 2 year flow • or more than a 10% increase from the 2 year to the 50 • year flow .
The development has an increase in flow durations for • more than 50% of the flows for the range of the
• duration analysis .
• • • • Existing Site 2/24/2016 10:40:51 AM Page 12
•
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume: 0 acre-feet
On-line facility target flow: O cfs.
Adjusted for 15 min: 0 cfs.
Off-line facility target flow: 0 cfs.
Adjusted for 15 min: 0 cfs.
Existing Site 2/24/201610:40:51 AM Page 13
• • • • • • • • • • • • • • • • • • • • • • •• e: • • • • • • • • • • • • • • • • • • • •
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
LID Report
LID Technique
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
'
Used for Total Volume
Treatment? Needs
Treatment
(ac-11)
"
Volume Infiltration CUmulatiVe Percent Water Quality Percent Comment
Through Volume Volume Volume Water Quality
Facility (aC-11) Infiltration Infiltrated Treated
(ac-11) Credit
Model Default Modifications
Total of O changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
Existing Site 2/24/2016 10:41 :04 AM Page 15
• • • • • •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
• • • • • • • • • • • • • • • • • • •
• • • • • • • • • • • • • • • • • • • • • • •
Appendix
Predeveloped Schematic
Existing Site
-xistin ~
1 ondit ans
A n7--
2/24/201610:41 :04 AM Page 16
Mitigated Schematic
I
I
I
' '
I
I -"· Develc ped I ondit ans 1
A n7--. . --
I
ixisting Site 2/24/2016 10:41 :04 AM Page 17
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
• •
• • • • • • •
• • • ,.
• • • ,. i. • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright© by : Clear Creek Solutions, Inc. 2005-2016; All
Rights Reserved .
Clear Creek Solutions, Inc .
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1 (866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
Existing Site 2/24/201610:41:05 AM Page 22
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
• • General Model Information • • Project Name: default[6] • Site Name: Kennydale
• Site Address:
• City: Renton • Report Date: 2/10/2016
• Gage: Seatac • Data Start: 1948/10/01
• Data End: 2009/09/30 • Timestep: 15 Minute • Precip Scale: 1.00
• Version: 2015/01/08 • • POC Thresholds • • • Low Flow Threshold for POC1: 50 Percent of the 2 Year
• High Flow Threshold for POC1: 50 Year
• • • • • • • • • • • • • • • • • • • • • • • defaultl6] 2/10/20161 :00:19 PM Page2
•
•
Landuse Basin Data • • Predeveloped Land Use • Predeveloped • Bypass: No • Groundwater: No • • Pervious Land Use Acres • C, Forest, Mod 1.69
C, Forest, Steep 2.53 •
Pervious Total 4.22 •
Impervious Land Use Acres • • Impervious Total 0 •
Basin Total 4.22 • •
Element Flows To: • 'Surface lnterflow Groundwater • • • • ei • • • • • • • • • • • • • • • • • • • • defaultl6] 2/10/20161:00:19 PM Page3 • I •
• • • Mitigated Land Use
• Developed • Bypass: No • GroundWater: No • • Pervious Land Use Acres
C, Lawn, Mod 1.94 • • Pervious Total 1.94
• Impervious Land Use Acres • PARKING MOD 2.28
• Impervious Total 2.28 • Basin Total 4.22 • • Element Flows To: • Surface lnterflow Groundwater • • • • • • • • • • • • • • • • • • • • • • • • • • default[6] 2/10/20161:00:19 PM Page 4
•
Routing Elements
Predeveloped Routing
default[6J
I
2/10/20161:00:19 PM Page 5
• • • • • • • • • • • • • • • • • • • • • • • • • • • • •
• i •1 •1 • • • • • • • • • • • •
Analysis Results
POC 1
. . . .
+-~-. -;--. c-c. ·=···''"";,~-·"·-··_· ~~--"
l-------------------1,.
OSI I i 10 20JO $11 10IO 1111. •1111ou1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area: 4.22
Total Impervious Area: 0
Mitigated Landuse Totals for POC #1
Total Pervious Area: 1.94
Total Impervious Area: 2.28
Flow Frequency Method: Log Pearson Type 111 178
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.164174
5 year 0.263054
10 year 0.325651
25 year 0.399379
50 year 0.450063
100 year 0.497158
Flow Frequency Return Periods for Mitigated. POC #1
1
Return Period Flow(cfs)
:2 year 1.159607
5 year 1.52534
11 O year 1 . 787025
25 year 2.1407 ~o year 2.42141
100 year 2.717331
I f.nnual Peaks
~nnual Peaks for Predeveloped and Mitigated. POC #1
'(ear Predeveloped Mitigated
1\949 0.185 1.640
11950 0.207 1.442
1951 0.331 0.959
1952 0.117 0.723
1953 0.091 0.819
1954 0.129 0.942
1955 0.230 1.087
1956 0.178 0.944
1957 0.160 1.173
1958 0.158 0.910
I
default[6] 2/10/20161:00:19 PM
I Page 7
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
• • • 1959 0.132 0.914
1960 0.239 1.081 • 1961 0.129 0.980 • 1962 0.089 0.777
1963 0.118 1.038 • 1964 0.154 0.906 • 1965 0.111 1.207
1966 0.103 0.811 • 1967 0.244 1.519 • 1968 0.137 1.779
1969 0.140 1.103 • 1970 0.121 1.073 • 1971 0.128 1.312
1972 0.260 1.391 • 1973 0.125 0.735 • 1974 0.126 1.271
• 1975 0.194 1.191
1976 0.134 1.000 • 1977 0.021 0.968
• 1978 0.124 1.264
1979 0.066 1.543 • 1980 0.306 2.024
• 1981 0.099 1.105
1982 0.233 1.682 • 1983 0.171 1.237 • 1984 0.114 0.833
1985 0.064 1.067 • 1986 0.285 0.985
• 1987 0.250 1.381
1988 0.105 0.875 • 1989 0.063 1.369 • 1990 0.556 2.406
1991 0.313 1.944 • 1992 0.133 0.884 • 1993 0.127 0.962
1994 0.043 0.826 • 1995 0.163 0.990 • 1996 0.376 1.423
1997 0.320 1.111 • 1998 0.094 1.093 • 1999 0.304 2.519
2000 0.132 1.113 • 2001 0.027 1.218 • 2002 0.148 1.455
2003 0.206 1.495 • 2004 0.275 2.388 • 2005 0.184 0.930
2006 0.190 0.903 • 2007 0.420 2.284 • 2008 0.542 1.811
2009 0.251 1.447 • • Ranked Annual Peaks
• Ranked Annual Peaks for Predeveloped and Mitigated . POC#1
Rank Predeveloped Mitigated • 1 0.5557 2.5189
• 2 0.5421 2.4062
3 0.4204 2.3882 • • default[6] 2/10/2016 1 :00:40 PM Page 8
•
• • 4 0.3762 2.2836 • 5 0.3311 2.0243
6 0.3198 1.9445 • 7 0.3127 1.8109 • 8 0.3061 1.7786
9 0.3038 1.6816 • 10 0.2852 1.6396 • i 1 0.2754 1.5427
12 0.2604 1.5186 • 13 0.2507 1.4949 • 14 0.2504 1.4552
is 0.2439 1.4468 • 16 0.2393 1.4424 • 17 0.2334 1.4229
is 0.2305 1.3911 • 19 0.2070 1.3810 • 20 0.2056 1.3689
21 0.1938 1.3116 • 22 0.1901 1.2714 • 23 0.1850 1.2642
24 0.1839 1.2372 • 25 0.1779 1.2176 • 26 0.1715 1.2072
27 0.1631 1.1907 • 28 0.1601 1.1729 •i 29 0.1583 1.1130
30 0.1535 1.1107 • 31 0.1481 1.1049 • 32 0.1399 1.1029 • 33 0.1365 1.0934
34 0.1339 1.0874 • 35 0.1333 1.0815 • 36 0.1319 1.0734
37 0.1317 1.0674 • 38 0.1294 1.0382 • 39 0.1292 1.0003
40 0.1277 0.9897 • 41 0.1266 0.9847 • 42 0.1262 0.9802
43 0.1249 0.9680 • 44 0.1235 0.9624 • 45 0.1212 0.9591
46 0.1180 0.9442 • 47 0.1170 0.9417 • 48 0.1140 0.9303
49 0.1108 0.9139 • ~o 0.1047 0.9103 • 51 0.1034 0.9065
52 0.0987 0.9033 • 53 0.0943 0.8836 • 54 0.0905 0.8749
~5 0.0892 0.8330 • 5,6 0.0662 0.8255 • 57 0.0641 0.8194
~8 0.0628 0.8113 • 59 0.0430 0.7768 • 5'0 0.0265 0.7345
6i1
0.0212 0.7228 • • default[6] 2/10/20161:00:40 PM Page 9 • I •
• • Duration Flows • The Facility PASSED •
Flow(cfs) Predev Mit Percentage Pass/Fail • • 0.0821 0 0 0 Pass
0.0858 0 0 0 Pass • 0.0895 0 0 0 Pass • 0.0932 0 0 0 Pass
0.0970 0 0 0 Pass • 0.1007 0 0 0 Pass • 0.1044 0 0 0 Pass
0.1081 0 0 0 Pass • 0.1118 0 0 0 Pass • 0.1155 0 0 0 Pass
0.1193 0 0 0 Pass • 0.1230 0 0 0 Pass • 0.1267 0 0 0 Pass
0.1304 0 0 0 Pass • 0.1341 0 0 0 Pass • 0.1378 0 0 0 Pass
0.1416 0 0 0 Pass • 0.1453 0 0 0 Pass • 0.1490 0 0 0 Pass
0.1527 0 0 0 Pass • 0.1564 0 0 0 Pass • 0.1601 0 0 0 Pass
0.1639 0 0 0 Pass • 0.1676 0 0 0 Pass ., 0.1713 0 0 0 Pass
0.1750 0 0 0 Pass •i 0.1787 0 0 0 Pass el 0.1824 0 0 0 Pass
0.1862 0 0 0 Pass • 0.1899 0 0 0 Pass • 0.1936 0 0 0 Pass
0.1973 0 0 0 Pass • 0.2010 0 0 0 Pass • 10.2047 0 0 0 Pass
0.2085 0 0 0 Pass • 10.2122 0 0 0 Pass • p.2159 0 0 0 Pass
0.2196 0 0 0 Pass • :~:~~~~ 0 0 0 Pass • 0 0 0 Pass • p.2308 0 0 0 Pass
0.2345 0 0 0 Pass • 0.2382 0 0 0 Pass
0.2419 0 0 0 Pass • 0.2456 0 0 0 Pass • 0.2493 0 0 0 Pass
b.2531 0 0 0 Pass • b.2568 0 0 0 Pass • b.2605 0 0 0 Pass • 0.2642 0 0 0 Pass
0.2679 0 0 0 Pass • 0.2717 0 0 0 Pass
0.2754 0 0 0 Pass • I • default[6) 2/10/2016 1 :00:40 PM Page 11 • I •
• • • 0.2791 0 0 0 Pass • 0.2828 0 0 0 Pass
0.2865 0 0 0 Pass • 0.2902 0 0 0 Pass • 0.2940 0 0 0 Pass
0.2977 0 0 0 Pass • 0.3014 0 0 0 Pass • 0.3051 0 0 0 Pass
0.3088 0 0 0 Pass • 0.3125 0 0 0 Pass • 0.3163 0 0 0 Pass
0.3200 0 0 0 Pass • 0.3237 0 0 0 Pass • 0.3274 0 0 0 Pass
0.3311 0 0 0 Pass • 0.3348 0 0 0 Pass • 0.3386 0 0 0 Pass
0.3423 0 0 0 Pass • 0.3460 0 0 0 Pass • 0.3497 0 0 0 Pass
0.3534 0 0 0 Pass • 0.3571 0 0 0 Pass • 0.3609 0 0 0 Pass
0.3646 0 0 0 Pass • 0.3683 0 0 0 Pass • 0.3720 0 0 0 Pass
0.3757 0 0 0 Pass • 0.3794 0 0 0 Pass • 0.3832 0 0 0 Pass
0.3869 0 0 0 Pass • 0.3906 0 0 0 Pass • 0.3943 0 0 0 Pass
0.3980 0 0 0 Pass • 0.4017 0 0 0 Pass • 0.4055 0 0 0 Pass
0.4092 0 0 0 Pass • 0.4129 0 0 0 Pass • 0.4166 0 0 0 Pass
0.4203 0 0 0 Pass • 0.4240 0 0 0 Pass • 0.4278 0 0 0 Pass
0.4315 0 0 0 Pass • 0.4352 0 0 0 Pass • 0.4389 0 0 0 Pass
0.4426 0 0 0 Pass • 0.4463 0 0 0 Pass • 0.4501 0 0 0 Pass • • • • • • • • • default[6[ 2/10/2016 1 :00:40 PM Page 12
• ------
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume: 0.3385 acre-feet
On-line facility target flow: 0.4043 els.
Adjusted for 15 min: 0.4043 els.
Off-line facility target flow: 0.2236 els.
Adjusted for 15 min: 0.2236 els.
default[6)
I
2/10/2016 1 :00:40 PM Page 13
• • • • • • • • • • • • • • • • • • • • • • • • . , .I
• • • • • • • • • • • • • • • • • •
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
LID Report
UO Technique
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Used for
Treatment?
Total Volume Volume
Needs Through
Treatment Facility
(3C·ft) (ac-fl.)
Infiltration Cumulative Percent Water Quality Percent Comment
Volume Volume Volume Waterauality
(ac..ff) Infiltration Infiltrated Treated
Credit
.,
Model Default Modifications
Total of O changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
default[6) 2/10/20161 :00:51 PM
I
Page 15
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • . , •1 .i • • • • • • • • • • • •
• • • Appendix
• Predeveloped Schematic
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • default[6]
•
-rede, •elopec
i 1 ..,,., __
T•
2/10/2016 1 :00:51 PM Page 16
Mitigated Schematic
I Develc ped
I 1 . 22ac
I
default(6]
I -
2/10/2016 1 :00:51 PM Page 17
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Predeveloped UGI File
RUN
GLOBAL
WWHM4
START
model simulation
1948 10 01
OUTPUT LEVEL RUN INTERP
RESUME 0 RUN 1
END GLOBAL
FILES
END 2009 09 30
3 0
UNIT SYSTEM 1
<File> <Un#>
<-ID->
<-----------File Name------------------------------>***
WDM
MESSU
END FILES
26
25
27
28
30
OPN SEQUENCE
INGRP
PERLND
PERLND
COPY
DISPLY
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFOl
default [6] . wdm
Predefault[6] .MES
Predefault [6] .L61
Predefault[6] .L62
P0Cdefault[6]1.dat
11
12
501
1
INDELT 00,15
***
# #<----------Title----------->***TRAN PIVL DIGl FILl PYR DIG2 FIL2 YRND
1 Predeveloped MAX 1 2 30 9
END DISPLY-INFOl
END DISPLY
COPY
TIMESERIES
# -# NPT
1
501
1
1
END TIMESERIES
END COPY
GENER
OPCODE
NMN
1
1
# # OPCD ***
END OPCODE
PARM
***
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
<PLS ><-------Name------->NBLKS Unit-systems
User t-series
in out
Printer
Engl Metr
***
***
***
# -#
11
12
END
C, Forest, Mod
C, Forest, Steep
GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active
# -# ATMP SNOW PWAT SED
11 0 0 1 0
12 0 0 1 0
END ACTIVITY
PRINT-INFO
1
1
1 1 1
1 1 1
27 0
27 0
Sections *****************************
PST PWG PQAL MSTL PEST NITR PHOS TRAC
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
<PLS
# -
>*****************Print-flags*****************************
# ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC
default[6] 2110/2016 1 :00:52 PM
***
PIVL PYR
*********
Page 18
11 0 0 4 0 0 0 0 0 0 0 0 0
12 0 0 4 0 0 0 0 0 0 0 0 0
END PRINT-INFO
PWAT-PARMl
<PLS > PWATER variable monthly parameter value flags ***
# -# CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
11 0 0 0 0 0 0 0 0 0 0 0
12 0 0 0 0 0 0 0 0 0 0 0
END PWAT-PARMl
PWAT-PARM2
<PLS > PWATER input info: Part 2 ***
# -# ***FOREST LZSN INFILT LSUR SLSUR KVARY
11 0 4.5 0.08 400 0.1 0.5
12 0 4.5 0.08 400 0.15 0.5
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER input info: Part 3 ***
# -# ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP
11 0 0 2 2 0 0
12 0 0 2 2 0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4
# -# CEPSC UZSN NSUR INTFW IRC LZETP
11 0.2 0.5 0.35 6 0.5 0.7
12 0.2 0.3 0.35 6 0.3 0.7
END PWAT-PARM4
PWAT-STATEl
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# -# *** CEPS
11 0
12 0
END PWAT-STATEl
END PERLND
I
IMPLND
GEN-INFO
SURS
0
0
<PLS ><-------Name------->
# -#
END GEN-INFO
*** Section !WATER***
ACTIVITY
uzs
0
0
Unit-systems
User t-series
in out
IFWS
0
0
Printer
Engl Metr
LZS
2.5
2.5
***
***
***
AGWS
1
1
<PLS >*************Active
# -# ATMP SNOW IWAT SLD
END ACTIVITY
Sections
IWG IQAL
*****************************
***
PRINT-INFO
<ILS >********Print-flags ******** PIVL PYR
# -# ATMP SNOW IWAT SLD IWG IQAL •••••••••
END PRINT-INFO
IWAT-PARMl
<PLS > IWATER variable monthly parameter value flags
# -# CSNO RTOP VRS VNN RTLI ***
END IWAT-PARMl
IWAT-PARM2
<PLS > IWATER
# -# ••• LSUR
END IWAT-PARM2
I •IWAT-PARM3
I
input info: Part 2 ***
SLSUR NSUR RETSC
default[6)
I
2/10/20161:00:52 PM
•••
1 9
1 9
AGWRC
0.996
0. 996
AGWETP
0
0
***
***
GWVS
0
0
Page 19
• • • • • • • • • • • • • • • • • • .,
• • • • • • • • • • • • • • • • • • • • • • • • •
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
<PLS > !WATER input info: Part 3 ***
# -# ***PETMAX PETMIN
END IWAT-PARM3
IWAT-STATEl
<PLS >***Initial conditions at start of simulation
# -# *** RETS SURS
END IWAT-STATEl
END IMPLND
SCHEMATIC
<-Source->
<Name> #
Predeveloped***
PERLND 11
PERLND 11
PERLND 12
PERLND 12
******Routing******
END SCHEMATIC
<--Area-->
<-factor->
1. 69
1. 69
2.53
2.53
<-Target->
<Name> #
COPY 501
COPY 501
COPY 501
COPY 501
MBLK ***
Tbl# ***
12
13
12
13
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran
<Name># #<-factor->strg
OUTPUT MEAN 1 1 48.4
<-Target
<Name>
DISPLY
vols> <-Grp> <-Member->
<Name> # # # <Name>##
COPY 501 1 INPUT TIMSER 1
<-Volume-> <-Grp>
<Name> #
<-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member->
<Name># #<-factor->strg <Name> # # <Name>##
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems
# -#<------------------><---> User T-series
in out
END GEN-INFO
*** Section RCHRES***
ACTIVITY
Printer
Engl Metr LKFG
<PLS >*************Active Sections*****************************
# -# HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
END ACTIVITY
PRINT-INFO
<PLS >*****************Print-flags******************* PIVL PYR
***
***
***
***
***
***
***
# -# HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL
END PRINT-INFO
PYR *********
HYDR-PARMl
RCHRES Flags for each HYDR Section
# -# vc Al A2 A3 ODFVFG for each
FG FG FG FG possible exit
* * * * * * * * *
END HYDR-PARMl
HYDR-PARM2
# -# FTABNO LEN DELTH
***
***
ODGTFG for each
possible exit
* * * * *
STCOR KS
***
FUNCT for each
possible exit
***
DB50
<------><--------><--------><--------><--------><--------><-------->
END HYDR-PARM2
***
***
HYDR-INIT
RCHRES Initial conditions for each HYDR section
# -# *** VOL Initial value of COLIND
*** ac-ft for each possible exit
***
Initial value of OUTDGT
for each possible exit
<------><--------> <---><---><---><---><---> *** <---><---><---><---><--->
END HYDR-INIT
END RCHRES
default[6] 2/10/20161:00:52 PM Page 20
SPEC-ACTIONS
END SPEC-ACTIONS
FTABLES
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran
<Name> # <Name>
WDM 2 PREC
WDM 2 PREC
WDM 1 EVAP
WDM 1 EVAP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp>
<Name> #
COPY 501 OUTPUT
END EXT TARGETS
MASS-LINK
# tern strg<-factor->strg
ENGL 1
ENGL 1
ENGL 0.76
ENGL 0.76
<-Member-><--Mult-->Tran
<Name># #<-factor->strg
MEAN 1 1 48. 4
<Volume>
<Name>
MASS-LINK
<-Grp> <-Member-><--Mult-->
<Name># #<-factor->
12
PERLND PWATER
END MASS-LINK
MASS-LINK
PERLND PWATER
END MASS-LINK
END MASS-LINK
END RUN
SURO
12
13
IFWO
13
0.083333
0.083333
<-Target vols> <-Grp> <-Member-> ***
<Name> # # <Name> # # ***
PERLND 1 999 EXTNL PREC
IMPLND 1 999 EXTNL PREC
PERLND 1 999 EXTNL PETINP
IMPLND 1 999 EXTNL PETINP
<-Volume-> <Member>
<Name> # <Name>
Tsys
tern
ENGL
Tgap
strg
Amd ***
strg***
REPL WDM 501 FLOW
<Target>
<Name>
COPY
COPY
<-Grp> <-Member->***
<Name>##***
INPUT MEAN
INPUT MEAN
default[6]
\
2/10/2016 1 :00:52 PM Page 21
• • • • • • • • • • • • • • • • • • • • • . , • .1 • • • • • • • • • • • • • • • • • • • •
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Mitigated UGI File
RUN
GLOBAL
WWHM4
START
model simulation
1948 10 01
OUTPUT LEVEL RUN INTERP
RESUME 0 RUN 1
END GLOBAL
FILES
END 2009 09 30
3 0
UNIT SYSTEM 1
<File> <Un#> <-----------File Name------------------------------>***
<-ID->
WDM
MESSU
END FILES
26
25
27
28
30
OPN SEQUENCE
INGRP
PERLND
IMPLND
COPY
DISPLY
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFOl
default[6] .wdm
Mitdefault[6] .MES
Mitdefault[6] .L61
Mitdefault[6] .L62
POCdefault[6]1.dat
17
12
501
1
INDELT 00,15
***
# -#<----------Title----------->***TRAN PIVL DIGl FILl PYR DIG2 FIL2 YRND
1 Developed MAX 1 2 30 9
END DISPLY-INFOl
END DISPLY
COPY
TIMESERIES
# -# NPT
1 1
501 1
END TIMESERIES
END COPY
GENER
OPCODE
NMN
1
1
# # OPCD ***
END OPCODE
PARM
***
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
<PLS ><-------Name------->NBLKS Unit-systems
User t-series
in out
Printer
Engl Metr
***
***
***
# -#
17 C, Lawn, Mod 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC
17 0 0 1 a a a a 0 a a 0 a
END ACTIVITY
PRINT-INFO
<PLS >*****************Print-flags*****************************
# -# ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC
17 o a 4 a a a a a a a a a
END PRINT-INFO
default[6] 2/10/2016 1 :00:52 PM
***
PIVL PYR
*********
1 9
Page 22
PWAT-PARMl
<PLS > PWATER variable monthly
# -# CSNO RTOP UZFG VCS VUZ
parameter
VNN VIFW
0 0
value
VIRC
0
flags ***
VLE INFC HWT ***
17 0 0 0 0 0
END PWAT-PARMl
PWAT-PARM2
<PLS > PWATER
# -# ***FOREST
17 0
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER
# -# ***PETMAX
17 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER
# -# CEPSC
17
END PWAT-PARM4
PWAT-STATEl
0.1
<PLS >***Initial
ran from
# -# *** CEPS
17 0
END PWAT-STATEl
input info: Part 2
LZSN INFILT
4.5 0.03
input info: Part 3
PETMIN INFEXP
0 2
input info: Part 4
UZSN NSUR
0.25 0.25
conditions at start
1990 to end of 1992
SURS UZS
0 0
0 0 0
LSUR
400
INFILD
2
INTFW
6
***
***
SLSUR
0.1
DEEPFR
0
IRC
0.5
of simulation
(pat 1-11-95)
IFWS
RUN 21
LZS
2.5 0
KVARY
0.5
BASETP
0
LZETP
0.25
***
AGWS
1
END PERLND
I
IMPLND
I GE~~~~F~<-------Name------->
# #
12 PARKING/MOD
END GEN-INFO
*** Section !WATER***
ACTIVITY
Unit-systems Printer
User t-series Engl Metr
in out
1 1 1 27 0
***
***
***
<PLS
# -
12
>*************Active
# ATMP SNOW IWAT SLD
Sections
IWG IQAL
*****************************
***
0 0 1 0
END ACTIVITY
PRINT-INFO
<ILS
# -
12
END
>********Print-flags
# ATMP SNOW IWAT SLD
0 0 4 0
PRINT-INFO
IWAT-PARMl
0 0
******** PIVL PYR
IWG IQAL *********
0 0 1 9
<PLS > IWATER variable monthly parameter value flags
# -# CSNO RTOP VRS VNN RTLI ***
12 0 0 0 0 0
END IWAT-PARMl
IWAT-PARM2
<PLS >
# -# ***
12
END IWAT-PARM2
IWAT-PARM3
IWATER
LSUR
400
<PLS > IWATER
# -# ***PETMAX
12 0
input info:
SLSUR
0.05
input info:
PETMIN
0
Part 2
NSUR
0.1
Part 3
RETSC
0.08
***
***
default[6] 2/10/20161:00:52 PM
I
***
***
***
AGWRC
0. 996
AGWETP
0
GWVS
0
Page 23
• • • • • • • • • • • • • • • • • • • e1 • • • • • • • • • • • • • • • • • • • • • • • •
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
--------------------
END IWAT-PARM3
IWAT-STATEl
<PLS > ***
# -# ***
12
Initial
RETS
conditions
SURS
at start of simulation
END IWAT-STATEl
END IMPLND
SCHEMATIC
<-Source->
<Name> #
Developed***
PERLND 17
PERLND 17
IMPLND 12
******Routing******
END SCHEMATIC
NETWORK
0 0
<--Area-->
<-factor->
1. 94
1. 94
2.28
<-Volume-> <-Grp> <-Member-><--Mult-->Tran
<Name> # <Name># #<-factor->strg
COPY 501 OUTPUT MEAN 1 1 48.4
<-Target-> MBLK ***
<Name> # Tbl# ***
COPY 501
COPY 501
COPY 501
<-Target
<Name>
DISPLY
vols>
# #
1
12
13
15
<-Grp> <-Member->
<Name>##
INPUT TIMSER 1
<-Volume-> <-Grp>
<Name> #
<-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member->
<Name># #<-factor->strg <Name> # # <Name>##
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits
# -#<------------------><--->
END GEN-INFO
*** Section RCHRES***
ACTIVITY
Unit Systems
User T-series
in out
Printer
Engl Metr LKFG
<PLS >*************Active Sections*****************************
# -# HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
END ACTIVITY
PRINT-INFO
<PLS >*****************Print-flags******************* PIVL PYR
***
***
***
***
***
***
***
# -# HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
END PRINT-INFO
HYDR-PARMl
RCHRES Flags for each HYDR Section
# -# VC Al A2 A3 ODFVFG for each
FG FG FG FG possible exit
**** *****
END HYDR-PARMl
HYDR-PARM2
# -# FTABNO LEN DELTH
***
***
ODGTFG for each
possible exit
* * * * *
STCOR KS
***
FUNCT for each
possible exit
***
DESO
<------><--------><--------><--------><--------><--------><-------->
***
***
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section
# -# *** VOL Initial value of COLIND
*** ac-ft for each possible exit
***
Initial value of OUTDGT
for each possible exit
<------><--------> <---><---><---><---><---> *** <---><---><---><---><--->
END HYDR-INIT
END RCHRES
SPEC-ACTIONS
default[6] 2/10/2016 1 :00:52 PM Page 24
END SPEC-ACTIONS
FTABLES
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran
<Name> # <Name>
WDM 2 PREC
WDM 2 PREC
WDM 1 EVAP
WDM 1 EVAP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp>
<Name> #
COPY 1 OUTPUT
COPY 501 OUTPUT
END EXT TARGETS
# tern strg<-factor->strg
ENGL 1
ENGL 1
ENGL 0.76
ENGL 0.76
<-Member-><--Mult-->Tran
<Name> # #<-factor->strg
MEAN 1 1 48.4
MEAN 1 1 48.4
MASS-LINK
<Volume>
<Name>
MASS-LINK
<-Grp> <-Member-><--Mult-->
<Name># #<-factor->
12
PERLND PWATER
END MASS-LINK
MASS-LINK
PERLND PWATER
END MASS-LINK
MASS-LINK
IMPLND IWATER
END MASS-LINK
END MASS-LINK
END RUN
SURO
12
13
IFWO
13
15
SURO
15
0.083333
0.083333
0.083333
<-Target vols> <-Grp> <-Member-> ***
<Name> #
PERLND 1
IMPLND 1
PERLND 1
IMPLND 1
<-Volume->
<Name> #
WOM 701
WDM 801
<Target>
<Name>
COPY
COPY
COPY
# <Name> # # ***
999 EXTNL PREC
999 EXTNL PREC
999 EXTNL PETINP
999 EXTNL PETINP
<Member> Tsys Tgap Amd ***
<Name> tern strg strg***
FLOW ENGL REPL
FLOW ENGL REPL
<-Grp> <-Member->***
<Name>##***
INPUT MEAN
INPUT MEAN
INPUT MEAN
default[6] 2/10/20161:00:52 PM Page 25
I
• • • • • • • • • • • • • • • .,
ei
•i • • • • • • • • • • • • • • • • • • • • • • • • • •
Mitigated HSPF Message File
default[6]
I
2/10/2016 1 :00:52 PM Page 27
• • • • • • • • • • • • • • • • • • . : .: ., •1 • • • • • • • • • • • • • • • • • • • • • •
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright© by: Clear Creek Solutions, Inc. 2005-2016; All
Rights Reserved .
Clear Creek Solutions, Inc .
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1 (866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
default[6J 2/10/2016 1 :00:52 PM Page 28
• • • 1• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
CPH
CONSULTANTS
APPENDIX C
PROJECT SITE AND UPSTREAM LAND USE SUMMARIES
Site Planning
Civil Engineering
ProjOlt Management
Land Development Consulting
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Senza Lakeview
Lot
Lot 1
Lot 2
Lot 3
Lot4
Lot 5
Lot 6
Lot 7
CPH Proiect No. 0139-15-001
CPI H CONSULTANTS
Lot
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot 8
Lot 9
Lot 10
Lot 11
Lot 12
Lot 13
Lot 14
Lot 15
Lot 16
Lot 17
ROW
51
52
Total
Total Area
,,· (SF) .
.·
8263
7496
9531
7260
7839
8225
6767
Project Site
.
Total Area Assumed%
* (SF) Impervious
8263 55%
7496 55%
9531 55%
7260 55%
7839 55%
8225 55%
6767 55%
7002 55%
7000 55%
7235 55%
7000 55%
7000 55%
7456 55%
7046 55%
7046 55%
7512 55%
7313 55%
45410 -
3176 -
7995 -
181540
. . ..
Modeled · Moaeled
Impervious\ Grass Area ,.' , __
Area (SF) · (SF)
.
4,545 3,718
4,123 3,373
5,242 4,289
3,993 3,267
4,311 3,528
4,524 3,701
3,722 3,045
Technical Information Report
Imp.
Coverage
4544.65
4122.8
5242.05
3993
4311.45
4523.75
3721.85
3851.1
3850
3979.25
3850
3850
4100.8
3875.3
3875.3
4131.6
4022.15
29810
0
0
99655.05
. Modeled
Impervious
Area (AC)
.' -.
0.104
0.095
0.120
0.092
0.099
0.104
0.085
Modeled
Grass Area
(AC)
0.085
0.077
0.098
0.075
0.081
0.085
0.070
February 25, 2016
Page 1
Senza Lakeview
Lot8 7002
Lot9 7000
Lot 10 7235
Lot 11 7000
Lot 12 7000
Lot 13 7456
Lot 14 7046
Lot 15 7046
Lot 16 7512
Lot 17 7313
ROW 45410
51 3176
52 7995
Total 183,572
Basin
Project Basin
CPH Project No. 01 39-15-001
CPI H CONSULTANTS
Basin A1
Basin A2
Basin A3
Basin A•
Basin B
Total
3,851 3,151
3,850 3,150
3,979 3,256
3,850 3,150
3,850 3,150
4,101 3,355
3,875 3,171
3,875 3,171
4,132 3,380
4,022 3,291
29,810 16,069
0 3,176
0 7,995
99,186 84,386
Upstream Basin
Total Area Assumed%
(SF) Impervious
192687 55%
213210 36%
435164 43%
466092 35%
144184 46%
20473 40%
1279123
Technical Information Report
0.088
0.088
0.091
0.088
0.088
0.094
0.089
0.089
0.095
0.092
0.674
0.000
0.000
2.28
Imp.
Coverage
105978
76756
187121
163132
66325
8189
607500.01
0.072
0.072
0.075
0.072
0.072
0.077
0.073
0.073
0.078
0.076
0.369
0.073
0.184
1.94
February 25, 2016
Page 2
• • • • • • •• I
•; • • • • •1 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Senza Lakeview
Lot
Project Basin
Basin A1
Basin A2
Basin A3
Basin A4
Basin B
Total
CPH Project No. 0139-15-001
CPI H CONSULTANTS
.·
•·· · · ... ·.· ·•· Modeled Total/Ve.a•. · · ·
(SF) . · •. Impervious :Area (sF)
.·.; ./; -,,
192687 105,978
213210 76,756
435164 187,121
466092 163,132
144184 66,325
20473 8,189
1,451,337 599,311
Technical Information Report
. tl(lpdeled : Modeled ·· Modeled
G(assAfea Impervious .Grass Area ..
i (SF) I• Area• (AC) (AC) · .. -•. .·
86,709 2.43 1.99
136,454 1.76
248,043 4.30
302,960 3.75
77,859 1.52
12,284 0.19
852,026 13.76
3.13
5.69
6.95
1.79
0.28
19.56
February 25, 2016
Page 3
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
CPH
CONSULTANTS
APPENDIX D
STORMFILTER PARAMETERS SUMMARY
Site Planning
Civil Engineering
Project Management
land Development Consulting
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
C()NTECH .
ENGINEERED SOLUTIONS Size and Cost Estimate
Prepared by Stephanie Jacobsen on February 22, 2016
Kennydale -Stormwater Treatment System
Renton, WA
Information provided:
• Total contributing area = 4.22ac
• Impervious area= 2.28ac
• Water quality flow, Owq = 0.22 cfs
• Peak hydraulic flow rate, O,eak = 2. 72 cfs
• Presiding agency= City of Renton, WA
Assumptions:
• Media = ZPG cartridges
• Cartridge flow rate = 11.25 gpm
• Drop required from inlet to outlet= 3.05' minimum
Size and cost estimates:
The StormFilter is a flow-based system, and is therefore sized by calculating the peak water quality flow rate
associated with the design storm. The water quality flow rate was calculated by the consulting engineer using
WWHM and was provided to Contech Engineered Solutions LLC for the purposes of developing this estimate .
The StormFilter for this site was sized based on a water quality flow rate of 0.22cfs. To accommodate this flow rate,
Contech Engineered Solutions recommends using an 8X11 Peak Diversion StormFilter vault with 9 cartridges
(see attached detail). The estimated cost of this system is $45.000, complete and delivered to the job site. This
estimate assumes that the vault is 8 feet deep. The final system cost will depend on the actual depth of the units and
whether extras like doors rather than castings are specified. The contractor is responsible for setting the BX11
StormFilter and all external plumbing .
Typically the precast StormFilters have internal bypass capacities of 1.8 cfs. Since the peak discharge off the site is
expected to exceed this rate, we recommend using a peak diversion StormFilter vault. This is why the 15-minute
offline flow was used .
©2012 Contech Engineered Solutions LLC
www.conteches.com
11835 NE Glenn Widing Dr., Portland OR 97220
Toll-free: 800.548.4667 Fax: 800.561.1271
Page 1 of 1
TS-P027
C(~NTECH"
ENGINEERED SOLUTIONS
CONTECH Stormwater Solutions Inc. Engineer:
Date
Site Information
Project Name
Project State
Project Location
Drainage Area, Ad
Impervious Area, Ai
Pervious Area, Ap
% Impervious
Runoff Coefficient, Re
Water quality flow
Peak storm flow
Filter System
Filtration brand
Cartridge height
Specific Flow Rate
Flow rate per cartridge
SUMMARY
lNumber of Cartridges
©2006 CONTECH Stormwater Solutions
contechstormwater.com
Determining Number of
Cartridges for Flow Based
Systems
SKJ
2/22/2016
Kennydale
Washington
Renton
4.22 ac
2.28 ac
1.94
54%
0.54
0.22 cfs
2.72 cfs
StormFilter
27 in
1.00 gpm/W
11.3 gpm
1 of 1
• • • • • • • • • • • • • • • •• .I
• • • • • • • • • • • • • • • • • • • • • • • • • • •
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
CPH
CONSULTANTS
APPENDIX E
CONVEYANCE CALCULATIONS
Site Planning
Civil Engineering
Project Management
land Development Consulting
Element From (Inlet) To (Outlet) Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap Lengthening Peak Time of Ma, Travel Design Max Flow/ Ma, Total Ma, Reported
ID Node Node Invert Invert Invert Invert Drop Slope Shape Diameter Width Roughness Losses Losses Losses Flow Gate Factor Flow Peak Flow Time Flow Design Flow Flow Depth/ Time Flow Condition
Elevation Offset Elevation Dff•" or Height Flow Velocity Capacity Ratio Total Depth Surcharged Depth
Occurrence Ratio
(ft) (ft) (ft) (ft) (ft) (ft) (%) (inches) (inches) (d,J (cfs) s hh:mm) (ft/sec) (min) (cfs) (min) (ft)
Pipe -11 CB-12 CB-11 7.22 43.92 0.00 43.78 0.00 0.14 2.0000 CIRCULAR 12.000 12.00 0.0120 0.5000 0.5000 0.0000 0.00 NO 100 1.63 0 00:01 3.19 0,04 5.46 0.30 1.00 1438.00 1.00 SURCHARGED
Pipe -10 CB-11 CB-4 49.28 43.78 0.00 41.95 0.03 1.83 3.7100 CIRCULAR 18.000 18.00 0.0120 0.5000 0.5000 0.0000 0.00 NO 100 2.74 0 00:00 2.15 0.38 21.93 0.12 1.00 1438.00 1.50 SURCHARGED
Pipe -4 CB-5 CB-4 34.45 45.54 0.00 43.34 1.42 2.20 6.3900 CIRCULAR 18.000 18.00 0.0120 0.5000 0.5000 0.0000 0.00 NO 100 19.44 0 00:00 12.81 0.04 28.76 0.68 1.00 1438.00 1.50 SURCHARGED
Pipe-3 CB-4 CB-3 31.88 41.92 0.00 40.60 0.00 1.32 4.1400 CIRCULAR 18.000 18.00 0.0120 0.5000 0.5000 0.0000 0.00 NO 100 19.46 0 00:02 13.82 0.04 23.16 084 0.74 0.00 1.11 Calculated
Pipe-2 CB-3 CB-2 40.73 40.60 0.00 29.90 0.00 10.70 26.2700 CIRCULAR 18.000 18.00 0.0120 0.5000 0.5000 0.0000 0.00 NO 100 19.52 0 00:02 18.04 0.04 58.33 0.33 0.63 0.00 0.94 Calculated
Pipe-1 CB-2 CB-1 49.00 29.90 0.00 27.50 0.00 2.40 4.9000 CIRCULAR 24.000 24.00 0.0120 0.5000 0.5000 0.0000 0.00 NO 100 19.51 0 00:02 10.27 0.08 54.24 0.36 0.58 0.00 1.16 Calculated
Element From {Inlet) To (Outlet) Length Inlet Inlet Outlet Outlet Total Average Channel Channel Channel Left Channel Right Entrance Exit/Bend Additional Initial Flap Lengthening Peak Time of Ma, Travel Design Ma11Flow/ Ma. Total Ma. Reported
ID Node Node Invert Invert Invert Invert Drop Slope Type Height Width Overbank Manning's Overbank "'~· Losses Losses Flow Gate Factor Flow Peak Flow Time Flow Design Flow Flow Depth/ Time Flow Condition
Elevation Offset Elevation Offset Manning's Roughness Manning's Flow Velocity Capacity Ratio Total Depth Surcharged Depth
Roughness Roughness Occurrence Ratio
(ft) (ft) (ft) (ft) (ft) (ft) (%) (ft) (ft) (d,J (ds) s hh:mm) (ft/sec) (min) (d,J (min) (ft)
OpenChannel CB-1 Outfall 25.00 27.50 0.00 26.09 0.00 1.41 5.6400 Trapezoidal 1.500 4.50 0.0000 0.0320 0.0000 0.5000 0.5000 0.0000 0.00 NO 1.00 19.51 0 00:02 6.91 0.06 42.18 0.46 0.73 0.00 1.09 Calculated
••••••••••••••••••••••••••••••••••••••••••••
62
60
48
46
e«
~ i ·2
40
38
36
34
32
30
211
26
24
ll
Profle Pio!
Moon Sheet Stam s-
--·-·:···--:----··-. ' .
... ; ..... ~. ;"1" '······>••·· • ~p fiMO ' ... : ...... , ···r, •. ~p~; .... • ·• •
• '· •······· • . ,_ ·····+· • • ""'' ···--. •, • . -<--·· .. ,, l ' . ' .... ; ..... _ ";., . . ., ..... ,. .,.,. """'" . . .• , .. ,.
· t + t·r::::1~1 11 ~H + =..'1:L)t.;. , ...... , ..... ' , ~ :., .... , ..... c····T : ' ·'···-; : ... 1 .... ;.
0+95 1.00 1.0S h10 1+15 1+20 1+25 1+30 1+35 1+40 1+45 1+50 1+55 1+60 1+65 1+70 1+75 1+80 1+85 1-90 1+95 2<00 2'°5 2+10 2+15 2+20 2+25 2+30 2+35 2+40 2+45 2+50 2+55 2+60 2+65 2+70 2+75 2+80 2+85
S1a6an(ft)
44
;43 i' 42
'i 41
}40 w
39
38
~
36
35
~
33
32
31
30
29
28
71
216
25
24
:l
hOO 1•10 1+20 1+30 1+.IO I~ 1.el 1+70 1+80 1+90
P!cffo Plot
Main Street s ..... s-
. ] .. . . . ... -·-.. ·······+ -~::-----~wn ~_ir1~-----. , ........ .,.. .,;.._" ........ , .......• 'a .. .,....,,,,u •• , ........... "'-»~•-., ... ··• ' -~m•· . • "-····
· -en . ·---·-· -~ ··::::::.~ _ "; .:::._-2&.81111 ·-··-
2+00 2+10 2+20 2+30 2+-40 2.-Sl
Stallon (ft)
2+80 2+70 2+80 2+90 ,-00
••••••••••••••••••••••••••••••••••••••••••••
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
CPH
CONSULTANTS
APPENDIX f
0FF1STE ANALYIS TABLE AND DOWNSTEAM PHOTOS
Site Planning
Civil Engineering
Project Management
Land Development Consulting
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Senza Lakeview
PHOTO #1 -LOOKING EAST AT OUTFALL OF
CONVEYANCE PIPE UNDER RAILROAD
CPH Proiecf No. 0139-15-001
CPIH CONSULTANTS
Preliminary Technical Information Report
PHOTO #2 -LOOKING WEST AT INLET TO
EXISTING CONVEYANCE SYSTEM BUILT DURING
BARBEE MILL PROJECT
Morch 4, 2016
••••••••••••••••••••••••••••••••••••••••••••
Basin; Mav Creek
Drainage
Component Type,
Name, and Size
Type: sheet flow, swale,
stream, channel, pipe,
pond; Size: diameter,
surface area
Sheet Flow
Roadside Ditch
Type 2 CB's & 18"-
24" concrete pipe
Ditch flow
Type 2 CB's & 24"-
3 O" concrete pipe
OFF-SITE ANALYSIS DRAINAGE SYSTEM TABLE
SURFACE WATER DESIGN MANUAL, CORE REQUIREMENT #2
Suhbasin Name: Suhbasin N11mher: -
Drainage Slope Distance Existing Potential Observations of field
Component from site Problems Problems inspector, resource
Description discharge reviewer, or resident
drainage basin, vegetation, % ~ml= 1,320ft. constrictions, under capacity, ponding, tributa_ry area, likelihood of problem,
cover,-depth, type of sensitive overtopping, flooding, habitat or organism overflow pathways, potential i_mpacts
area, Volume destruction, scouring, bank Slollghing,
sedimentation, incision, other erosion
Shallow, concentrated
Unable to follow flow path as
sheet flow is carried flows ( red arrows in 0-15 O' -670' None throughout multiple Figure 7) downstream private properties
Grass lined ditch 0-0.5 0-390' None No problems observed
Structures with 18" -24" 0-175' None No problems observed -
pipes
Shallow, well 5.6 175' -200' None See photos # I , #2 maintained ditch
Structures with 24"-30" 0.26-6.2 200' -540' None See Figure 7 pipes
2/26/16