Loading...
HomeMy WebLinkAbout09-066 Misc La Fortuna® King County Department of Development and Environmental Services 900 Oakesdale Avenue Southwest Renton, WA 98055-1219 Inspector's Daily Report Project No.: _____________ Activity No.: ___________ _ Pr~ectNrune: ____________________________ _ Location: __________________ Developer/Contractor: _____________ _ Date Signed REPORT Note: Each entry must be dated and signed S\Forms\Current Forms\Ins-Dail.Fm -01-16-2001 Addendum to Technical Information Report for LA FORTUNA TOWNHOUSES King County Tax Parcel 0739000020 -Renton. Washington /tJ-/l-O"'1 DRS Project No. 06163.500 King County Project No. B03DC001 Owner/Applicant GMP Homes 11317 NE 1201 " Street Kirkland. WA 98034 Report Prepared By Nadeem A Khan lrumtl D. R STRONG Consulting Engineers, Inc 10604 N E 38th Place, Suite 101 Kirkland WA 98033 (425) 827-3063 :KING COUN1Y D.D.h.~. BUILDING SERVICES DMSION C01\1MERCIAL PROmCf APPROVAl Project No. Lo'Al'c.o't..1....=~"=" __ I'!:9i ect Name 1.A JYaT",e ,ec.""z... lAlSITE ENGINEERlNG/D~ APPROVAL , DArE Ole.O:(l#SIGNED"vL1l1 ?:zte:; P.t:. o TRAFF1C pLANNING APPROVAL DATE SIGNED 0- ::J lANDSCAPE/ZONING/pARKING DATE SIGNED ---- 1 "i-FeW. COl'mmONS' Report Issue Date Mruch 10, 2008 Walter Shostak Subject: FW: La Fortuna Vault Attachments: TEMPL 1 BYP doc; L 1 BYP bmp From: Walter Shostak Sent: Monday, November 26, 2007 2:23 PM To: 'mike,melns@kingcounty,gov' Cc: 'Lee Brannam' Subject: La Fortuna Vault Hi Mike: Page 1 of 1 The control structure riser has 0 25' of freeboard instead of 05' as per design. I've confirmed that the other dimensions are within acceptable design tolerances. In order to provide the required freeboard I've re-analyzed the vault performance with 440' of detention depth (see attached) I propose to remove 0.35' from the top of the overflow riser, and re-drill the top orifice to be I 3/8", leaving the bottom orifice at 1 3116", The top orifice height would remain at 3.20', The asbuilt vault would provide the required Level! flow control without further modification, since the vault already included some additional volume. The required detention volume with 4.40' of detention depth is 18,883 cu-ft and the asbuilt volume would be 19,400 cu-It If you have no comments or concerns. we will proceed with the modification and submit a revised asbuilt and volume certification for the vault. Thanks, D.R. STRONG Consulting Engineers Inc. CIVIL ENGINEERS PLANNERS SURVEYORS PleCl.se Note: Walter J. Shostak, P.E. Project Engineer 10604 N E. 38th Place Suite n01 Kirkland. WA 98033 Office: (425) 827-3063 Fax: (425) 827-2423 TI: (800) 962-1402 The information in this E-mail message, and any files transmitted with It, Is confidential and may be legally privileged It [5 intended only for the use of the \ndlvldual(s) named above Jf you are the intended recipient, be aware that your use of any confidential or perSonal Information may be re5trlcted by state and federal privacy laws H you, the reader of this message, are not the intended recipient, you are hereby notified that you should not further disseminate, distribute, or forward this E-mail message H you have received this E-mail in error, please notify the sender and delete the material from any computer Thank you 3110/2008 Retention/Detention Facility Type of Facility: Detention Vault Facility Length: 6,.,1 it Facility Width: 6,.51 ft A~<tl'c ~(,..~ Facility Area: 4292. ft sq. rle.t:>,;X:~<."",:> "1'5.).0' f dC . Effective Storage Depth: 4.40 ft ./ ~ Stage 0 Elevation: 38'.77 it ,./ Storage Volume: 18883. cu. Lt Riser Head: 4.40 ft / Riser Diameter: 12.00 inches ./ Number of orifices: 2 Full Head Pipe Orifice ff Height Diameter Discharge Diameter 1ft) lin) ICFS) (in) 1 0.00 1.17 0.079 2 3.20 1.38 0.0,7 4.0 ../' Top Notch Weir: None Outflow Rating Curve: None Stoge Elevation Storage Discharge Percolation 1ft) 1ft) (cu_ tt) lac-ft) Icfs) (cfs) 0.00 385.77 O. 0.000 0.000 0.00 0.01 38,.78 O. 0.001 0.004 0.00 0.02 385.79 86. 0.002 0.006 0.00 0.04 38,.81 172. 0.004 0.007 0.00 0.05 385.82 215. 0.00, 0.008 0.00 . 0.06 38,.83 2,8. 0.006 0.009 0 .. 00 0.07 38,.84 300. 0.007 0.010 0.00 0,09 38,.86 386. 0.009 0,011 0.00 0.10 385.87 429. 0.010 0.012 0.00 0.20 385.97 858. 0.020 0,017 0,00 0.30 386.07 1288, 0.030 0.020 0.00 0.40 386.17 1717 . 0.039 0.024 0.00 0.50 386.27 2146. 0.049 0.026 0.00 0.60 386.37 2,75. 0.059 0.029 0.00 0.70 386. 47 3004. 0.069 0.031 0.00 0.80 386.57 3433. 0.079 0.033 0.00 0.90 386.67 3863. 0.089 0,035 0.00 1. 00 386 .. 77 4292 . 0.099 0.037 0.00 1. 10 386.87 4721. 0.108 0.039 0.00 1. 20 386.97 ,150. 0.118 0.041 0.00 1. 30 387.07 5,79. 0.128 0.043 0.00 1. 40 387. 17 6008. 0 .. 138 0.044 0.00 1. 50 387.27 6438. 0.148 0.046 0.00 1. 60 387.37 6867. 0.1,8 0.047 0.00 1. 70 387. 4 7 1296. 0.167 0.049 0.00 1. 80 387.57 7725. 0.177 0.050 0.00 1. 90 387.67 81,4 .. 0.187 0,052 0.00 2.00 387.77 8583. 0.197 0.053 0.00 2.10 387.87 9013. 0.207 0.0,4 0.00 2.20 387.97 9442. 0.217 0.0,6 0.00 2.30 388.07 987L 0.227 0.0,7 0.00 2.40 388.17 10300. 0.236 0.058 0.00 2.50 388.27 10729. 0.246 0.059 0.00 2.60 388.37 11158. 0.256 0.060 0.00 2.70 388.47 11588. 0.266 0.062 0.00 2.80 388.57 12017. 0.276 0.063 0.00 2.90 388.67 12446. 0.286 0.064 0.00 3.00 388.77 12875. 0.296 0.065 0.00 3.10 388.87 13304. 0.305 0.066 0.00 3.20 388.97 13733. 0.315 0.067 0.00 3.21 388.98 13776. 0.316 0.067 0.00 3.23 389.00 13862. 0.318 0.069 0.00 3.24 389.01 13905. 0.319 0.071 0.00 3.26 389.03 1399l. 0.321 0.074 0.00 3.27 389.04 14034. 0.322 0.078 0.00 3.29 389.06 14120. 0.324 0.082 0.00 3.30 389.07 14163. 0.325 0.084 0.00 3.31 389.08 14205. 0.326 0.086 0 .. 00 3.33 389.10 14 29l. 0.328 0.087 0.00 3.43 389.20 14720. 0.338 0.094 0.00 3.53 389.30 15150. 0.348 0.100 0.00 3.63 389 .. 40 15579. 0.358 0.105 0.00 3.73 389.50 16008. 0.367 0.110 0.00 3.83 389.60 16437. 0.377 0.114 0.00 3.93 389.70 16866. 0.387 0.118 0.00 4.03 389.80 17295. 0.397 0.122 0.00 4.13 389.90 17725. 0.407 0.126 0.00 4. 23 390.00 18154. 0.417 0.129 0.00 4. 33 390.10 18583. 0.427 0.133 0.00 4.40 390.17 18883. 0.434 0.135 0.00 4. 50 390.27 19313 . 0.443 0.446 0.00 4.60 390.37 19742. 0.453 1. 010 0.00 4.70 390.47 20171. 0.463 1. 74 0 0.00 4. 80 390.57 20600. 0.473 2.540 0.00 4.90 390.67 21029. 0.483 2.820 0.00 5.00 390.77 21458. 0.493 3.080 0.00 5.10 390.87 21888. 0.502 3.320 0.00 5.20 390.97 22317. 0.512 3.540 0.00 5.30 391. 07 22746. 0.522 3.750 0.00 5.40 391. 17 23175. 0.532 3.950 0.00 5.50 391.27 23604. 0.542 4.130 0.00 5.60 391.37 24033. 0.552 4.310 0.00 5.70 391.47 244 63. 0.562 4.480 0.00 5.80 391.57 24892 . 0.571 4.650 0.00 5.90 391.67 25321. 0.581 4.810 0.00 6.00 391.77 25750. 0.591 4.960 0.00 6.10 391. 87 26179. 0.601 5.110 0.00 6.20 391. 97 26608. 0.611 5.260 0.00 6.30 392.07 27038. 0.621 5.400 0.00 6.40 392.17 27467. O. 631 5.540 0.00 Hyd Inflow Outflow Peak Storage Stage Elev leu-Ft) IAc-Ft ) 1 0.89 0.76 4.55 390.32 19548. 0.449 2 0.45 0.31 4.46 390.23 1913l. 0.439 3 0.45 0.13 4.38 390.15 18789. 0.431 4 0.47 0.12 3.96 389.73 17003. 0.390 5 0.53 0.11 3.76 389.53 16128. 6 0.28 0.06 2.90 388.67 12465. 7 0.41 0.05 1. 75 387.52 7501. 8 0.37 0.05 2.06 387.83 8827. Hyd RID Facility Tributary Reservoir poe Outflow Outflow Inflow Inflow 1 0.76 0.09 1..-1' ....... ** 2 0.31 0.04 'I>*-Jt***** 3 0.13 0.04 ******** 4 0.12 0.05 ******** 5 0.11 0.05 *** .... *** 6 0.06 0.03 **--***** 7 0.05 0.04 ***** ...... 8 0.05 0.04 ******** ---------------------~------------ Route Time Series through Facility Inflow Time Series File:rdin.tsf Outflow Time Series File:rdout poe Time Series File:dsout InflowlOutflow Analysis Peak Inflow Discharge: 0.892 Peak Outflow Discharge: 0.156 Peak Reservoir Stage: 4.55 Peak Reservoir Elev: 390.32 CFS CFS Ft Ft Target ******* ** ... ** ..... 0.16 ******* ******* 0.09 ******* **'it ... oJ.** at 6:00 at 9:00 Peak Reservoir Storage: 19548. Cu-Ft 0.449 Ac-Ft Add Time Series:bypassHtsf Calc 0.B3 0.34 0.16 0.14 0.13 0.09 0.09 0.07 on Jan on Jan 0.370 0.286 0.172 0.203 9 in Year 8 9 in Year 8 Peak Summed Discharge: 0.827 CFS at 9:00 on Jan 9 in Year 8 Point of Compliance rile:dsout.tsf flow Frequency Analysis Time Series File:rdout.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- Flow Rate Rank Time of Peak (CFS) 0.314 2 2109/01 16:00 0.054 7 12/28/01 17:00 0.111 5 2/28103 7:00 0.OQ9 8 6/26/04 6:00 0.06Q 6 1/05/05 15:00 0.119 4 1/18/06 22:00 0.134 3 11/24/06 7:00 0.756 1 1/09/08 9:00 Computed Peaks Flow Frequency Analysis Time Series File:dsout.tsf Project Location~Sea-Tac ---Annual Peak Flow Rates--- ~low Rate Rank Time of Peak (CFS) -----Flow Frequency Analysis------- --Peaks --Rank Return Prob (CFS) (ft) Period 0.156 4.55 1 100.00 0.990 0.314 4.46 2 25.00 0.960 0.134 4.38 3 10.00 0.900 0.119 3.96 Q 5.00 0.800 0.111 3.76 5 3.00 0.667 0.064 2.90 6 2.00 0.500 0.054 2.06 1 1.30 0.231 0.049 1.15 8 1.10 0.091 0.609 4.53 50.00 0.980 -----Flow F~equency Analysis------- --Peaks Rank RetUrn" I?rob (CFS) Period / 0.337 2 2/09/01 16:00 0.827 1 100.00 0.990 0.072 8 1/05/02 16:00 0.337 2 25.00 0.960 0.127 5 2128/03 5:00 0.159 3 10.00 0.900 0.085 7 8/26/04 2;00 0.141 4 5.00 0.800 0.087 6 1/05/05 8;00 0.127 5 3.00 0.667 0,141 4 1/18/06 21;00 0,087 6 2,00 0.500 0.159 3 11/24/06 4; 00 0.085 7 1.30 0.231 0,827 1 1/09/08 9:00 0.072 8 1.10 0,091 Computed Peaks 0.663 50.00 0.980 (j) u. u ~ '" Ol n; .s:: U en a 2 Retum Penod 5 50 100 10 20 'IOOI,r-~~~~~~~~~~~~~~~~~~~~~~~~J-----~~~~~~J-~~~~~~~~J-----~~~--~ ,<> rdout.pi<s In Sea-Tae • dsout.pks " PREDEV.pl<s • BYPtlSS. pl{s '" R "~l 0 • 00 • 0 Q 0 0 • • • 0 Q It 0 • 0 " • • • s 0 • • <> n • 99 C) '10 017 I ---r-----::r--~--;;--;~---;;~~~;;____;~_;____;;__; 1 2 10 98 20 30 40 50 5 60 70 80 gO 95 Cumulative Probability ~ King County Department of Development and Environmental Services 900 Oakesdale Avenue Southwest Renton, WA 98057-5212 206-296-6600 TTY 206-296-7217 www.metrokc,gov Design Plan Change NOT TO BE USED FOR EARLY START To Be Completed by Land Use Inspection Section This plan change is for LandscapeiRecreation/Street Tree: 0 ~ within the City of: ~....J A lieant: Address: 'Plan Change No. Plan Change Activity No. /...0 S' Pt Or:;...d..-- Upon completion of the review of the revisions, the reviewer shall notifY the design engineer: J> ?"Z. 1--}. \ Address: E:.... 0 Project Name: l..A-~""A ]'eo:v.u ~roject No. BQ3>Oc::-<29 I IX 000 /.2. '11 I Site Address: rZk3-z. ';"?E ~~ Inspect Activity No. -L..o5"$1 t 1+ On :t I \ 5' / I!) '0 , the folio . c ange to he approved plan was: (recommended by DDES) ~_S) r e . t) ~VI U9 ~ j)j)~> &o.....J ~SJ~ S Reason for Change/Code Citation: ~~ =ro ~!E!f3'o/c ~ ful~A.J MA:Nv""",-" PI "--2< 3.k A This Plan Change involves: o Roadway Plan & Profile [}(brain age o Traffic o Materials Lab Land Use Projects Only Project is: 0 recorded 0 not recorded o Platting o Planner 0 Site Development Services (Grading) o Other The proposed change requires revised engineering drawings that must be submitted to the Department of Development and Environmental Services for approval: I Please call (206) 296-7137 when ready to submit. Design changes must be made by a professional civil engineer registered in the State of Washington. Payment of fees and deposits are due as of the date of this plan change, late penalties (KCC 27.02.030) are applicable. Each submittal shall include three (3) sets of revised plans highlighted in green with a revision block and a symbol by each revision. The revision block must be dated and initialed by the professional engineer making the revision. A copy of this form will be mailed directly to the design engineer indicated above and shall be included with each submittal. The review will be completed as soon as possible. Approval/denial will be directed to the persons indicated on the top of this form. S:Currenl Fonn. Design Pm Change,doc 09·12·06 ~ King County Department of Development and Environmental Services 900 Oakesdale Avenue Southwest Renton, WA 98057-5212 206-296-6600 TTY 206-296-7217 www.metrokc.gov June 11,2008 Karl Best P.O. Box 1790 Snohomish, WA 98291 RE: King County Project Number. __ -=L~0.!..J7P!...:C,,-I~0,-,,5,--____ _ Project Narne ________ -'L"'aF....,o"'rtuna="'-'T...,o""wnh="'o,.,m"'e"'s'--__ Dear Mr. Best: Thank you for the May I, 2008 application for Plan Change No. I for the LaFortuna Townhomes commercial site development permit issued under DDES Activity No. B03DCOOI. The purpose of this letter is to notify you that the Site Engineering and Planning (SE&P) Section, Building Services Division, has reviewed the engineering submittal prepared by D.R. Strong Consulting Engineers, Inc. and dated Nov. 14,2007. The following list summarizes site engineering issues that must be addressed in your next submittal. I) Please include a detail illustrating the proposed 6-inch perforated interceptor drain with respect to the standard rockery detail on sheet C8, which shows a 12-inch perforated drain behind the wall. 2) Please secure and record a temporary construction easement agreement with the adjacent property owner reflecting the proposed offsite work along the north central property line as indicated by the following note on plan sheet C6: "Drain Offsite Low Area to Temp. Interceptor Drain". Once recorded, please inform DDES of the recording number. In addition to any submittal requirements noted in the comments, please submit three (3) copies of corrected plan sheets to the Permit Center, 900 Oakesdale Ave SW, Renton, WA 98057-5212. All review comments must be addressed before the engineering plans can be approved. Due to the nature of the comments, further review is necessary. Karl Best June II, 2008 Page 2 Thank you again for your pennit application. If you have questions regarding these comments, please contact me at 206-296-7207 or david.ratte@kingcounty.gov. Sincerely, David M. Ratte, P.E. Engineer III, Site Engineering and Planning (SE&P) Section, Building Services Division cc: WaIter J. Shostak, P .E., D.R. Strong Consulting Engineers, Inc Mike Meins, Engineer II, Land Use Inspections Section, Land Use Services Division soc ~ Kin51County Department of Development and Environmental Services 900 Oakesdale Ave SW Renton, Washington 98057-5212 May I, 2008 Summary of Charges and Payments Applicant: Char es Description GMP HOMES RENTON, LLC ATTN: GREG PENDERGAST 11317 NE 120TH ST KIRKLAND, WA 98034 Deposit Based on Est Hrs Site Inspect Counter Fcc HOURLY FEE: Site Inspection SUB TOTAL CHARGES: Payments Activity Number: Project Num ber: Development Number: Perm it Type: Status: Page 1 of 1 L08PC022 XOOOl279 CHANGE PENDING Amount $1,372.00 $205.()() $28.00 $1,605.00 Description Check # Checklogid Payee Date Entered Amount .:;C",he""c",k~~~~8;,;;5.;.13,--~~~~~~_--"G~M"",P~H~O..;M~E,;.S~IN~C;.,.,.,. __ ~4 ... 1;.30~/2~0,""0,,,8~~~ ___ (c;,$=1,605.00) SUB TOTAL PA YM~:NTS: (SI,605.00) BALANCE: The fees shown above represent current charges as of this date and are an estimate based on the information provided to DOES at the time of application. $(),()() For services that are rendered on an hourly basis, the cost of those services will be based on the actual hours worked. Hourly fees are charged at the rate in effect at the time of service, and will be billed monthly, along with any other outs tan ding fees. Fees that have been posted prior to permit issuance will be collected at that time. Fees subsequently posted will be billed 10 Ihe applicant. All fees must be paid in full before DOES issues Final Approval, T.C.O. or C.O. tQ King County Department of Development and Environmental Services 900 Oakesdale Avenue Southwest Renton, WA 98057-5212 206-296-6600 TTY 205-295-7217 www.metrokc.gov Design Plan Change NOT TO BE USED FOR EARL Y START To Be Completed by Land Use Inspection Section This plan change is for LandscapeiRecreation/Street Tree: 0 ~ within the City of: ~....J klL GVCUr\NJ'Yl :k '1 A licant: Address: Plan Change No. __ ..:fft-..:......::'--________ _ Plan Change Activity No. 1-0 S' PC Or:;..,'J.- Upon completion of the review of the revisions, the reviewer shall notify the design engineer: j: ~,!-1,..}\ Address: o Project Name: I-A-fO.<z.:rvl>-.lA 1Ow.u~rojectNo. fu3JX..oo) h<Qx.>/,2 71 I Site Address: rZk3z. 1£ ~~InspectActiVitYNO. ~5$1 114- On 11 \5/ o't;, ,the follo . c ange to he approved plan was: (recommended by DOES) V-~_S) r e . t)\'--fAVIUP 'N j>J)~) -Jo ASJ[J~$ Reason for Change/Code Citation: ?,,:;.~ =ro !?Uer;" &:W~ ~~"-' IVAr-Jv/>rO.-6 G... 5. 3. kA This Plan Change involves: o Roadway Plan & Profile !2(Drainage Land Use Projects Only Project is: 0 recorded 0 not recorded o Traffic 0 Materials Lab o Platting 0 Planner 0 Site Development Services (Grading) o Other The proposed change requires revised engineering drawings that must be submitted to the Department of Development and Environmental Services for approval: I Please call (206) 296-7137 when ready to submit. Design changes must be made by a professional civil engineer registered in the State of Washington. Payment of fees and deposits are due as of the date of this plan change, late penalties (KCC 27.02.030) are applicable. Each submittal shall include three (3) sets of revised plans highlighted in green with a revision block and a symbol by each revision. The revision block must be dated and initialed by the professional engineer making the revision. A copy of this form will be mailed directly to the design engineer indicated above and shall be included with each submittal. The review will be completed as soon as possible. Approval/denial will be directed to the persons indicated on the top of this form. S:Currenl Form. Design P!J1 Change.doc 09-12-06 ~ King County Department of Development and Environmental Services 900 Oakesdale Avenue Southwest Renton, WA 98057-5212 206-296-6600 TTY 206-296-7217 www,metrokc,gov Design Plan Change NOT TO BE USED FOR EARL Y START To Be Completed by Land Use Inspection Section This plan change is for Landscape/Recreation/Street Tree: D ~ within the City of: ~....J A lieant: Address: Plan Change No. Plan Change Activity No. /-0 ~ Pt O~;}." Upon completion of the review of the revisions, the reviewer shall notify the design engineer: J\:?1, 'l--}I Address: Project Name: l.-A-~""A ,-o.v-.J~roject No. fup -IX.-.:;;;o l/X~ /1. '11 Site Address: ,~ 1?!f Pesn:aav'l~ Inspect Activity No. .£.-o5"$t 1\ + On ttl \ 5/ 0'0 , the follo . c ange to he approved plan was: (recommended by DOES) V-~_S) r . t) ~"IU9 ~ j>,l)M -ra ~SJf,~~ Reason for Change/Code Citation: ~~ =ro 2U£f9"lT'F W~ ~I~"""; ~v __ flf-... <[.3.kA This Plan Change involves: D Roadway Plan & Profile [}(brainage Land Use Projects Only Project is: D recorded D not recorded D Materials Lab D Traffic D Platting D Planner D Site Development Services (Grading) D Other The proposed change requires revised engineering drawings that must be snbmitted to the Department of Development and Environmental Services for approval: I Please call (206) 296-7137 when ready to snbmit. Design changes must be made by a professional civil engineer registered in the State of Washington. Payment of fees and deposits are due as ofthe date of this plan change, late penalties (KCC 27.02.030) are applicable. Each submittal shall include three (3) sets of revised plans highlighted in green with a revision block and a symbol by each revision. The revision block must be dated and initialed by the professional engineer making the revision. A copy of this form will be mailed directly to the design engineer indicated above and shall be included with each submittaL The review will be completed as soon as possible. Approval/denial will be directed to the persons indicated on the top of this form. S:Current Fonn. Design P<Il Change.doc 09-12-06 tQ King County Department of Development and Environmental Services 900 Oakesdale Avenue Southwest Renton, WA 98057-5212 206-296-6600 TTY 206-296-7217 www.metrokc.goY Design Plan Change NOT TO BE USED FOR EARLY START To Be Completed by Land Use Inspection Section This plan change is for LandscapeiRecreation/Street Tree: D within the City of: ~....J A licant: Address: Plan Change No. !A Plan Change Activity No. ~O 3' Pc. 0 t;)...'J.., Upon completion of the review of the revisions, the reviewer shall notify the design engineer: JI: ~'Z. 1.-)1 At; Address: Project Name: £...A. fO.e..r-v/'oJA tewt-.l ~roject No. fu3. '\X.. OQ I h<~ /.2, '71 I Site Address: I~ f'P ~~InspectActiVitYNO. .£...oS"$t 11+ On 1/ \ s: / 0'0 , the folio . c ange to he approved plan was: (recommended by DDES) Cr~.S) r e . t) ~"IU9 ~ j)j)!V> -)0 ~SJ~ $ Reason for Change/Code Citation: ~~ =ro '2(1e'f3', &:W~ ~.:;........; MA:NvA:<= fiG,., 1.3.4'A This Plan Change involves: Land Use Projects Only D Roadway Plan & Profile [}(Drainage Project is: 0 recorded 0 not recorded D Traffic D Materials Lab D Platting D Planner D Site Development Services (Grading) D Other The proposed change reqUires revised engineering drawings that must be submitted to the Department of Development and Environmental Services for approval: I Please call (206) 296-7137 when ready to submit. Design changes must be made by a professional civil engineer registered in the State of Washington. Payment of fees and deposits are due as of the date of this plan change, late penalties (KCC 27.02.030) are applicable. Each submittal shall include three (3) sets of revised plans highlighted in green with a revision block and a symbol by each revision. The revision block must be dated and initialed by the professional engineer making the revision. A copy of this form will be mailed directly to the design engineer indicated above and shall be included with each submittal. The review will be completed as soon as possible. Approvalldenial will be directed to the persons indicated on the top of this form. Inspector Name and Phone o. (please print) ~, Zq,&<>. Developer Representative date ,",tials/d. S:Current Form. Design Pm Change. doc 09-12-06 soc l~~ Department of Development ~ and Environmental Services King County 900 Oakesdale Ave SW Renton, Washington 98057-5212 April 16, 2008 Page 1 of 1 THIs IS NOT A FINAL FEE DETERMINATlON Summary of Charges and Payments , Applicant: Char Tes Description GMP HOMES RENTON, LLC ATTN: GREG PENDERGAST 11317 NE 120TH ST KIRKLAND, WA 98034 Deposit Based on Est Hrs Site Inspect Counter Fee SUB TOTAL CHARGES: Payments Description Check # Checklogid SUB TOTAL PAYMENTS: BALANCE: Payee , Activity Number: , Project Number: , Development Number: Permit Type: Status: Date Entered L08PC022 XOOOl279 CHANGE PENDING Amount $1,400,00 $205,00 $1,605.00 Amount $0.00 $1,605.00 The fees shown above represent current charges as of this date and are an estimate based on the Infonnation ,provided to DOES at the time of application. iFor services that are rendered on an hourly basis, the cost of those services will be based on the actual hours ;worked. Hourly fees are charged at the rate in effect at the time of service, and will be billed monthly, along with iany other outstanding fees. ;Fees that have been posted prior to permit issuance will be collected at that time. Fees subsequently posted will be :billed to the applicant. All fees must be paid in full before DOES issues Final Approval, T.C.O. or C.O. til King County Department of Development and Environmental Services 900 Oakesdale Avenue Southwest Renton, WA 98057-5212 Inspector's Daily Report 206-296-6600 TTY 206-296-7217 www.metrokc.gov Project No.: _____ _ _ __ Activity No.: ___________ _ Project Name: _________________________ ~ Location: _____ Deve!oper/Contractor: _____________ _ Date Signed REPORT Note: Each entry must be dated and signed S\fonns\Current Fonns\Ins-Dail Fm -09-] ·1-('0 Web date: 06129/2007 til King County Department of Development and Environmental Services 900 Oakesdale Avenue Southwest Renton, Washington 98057-5212 206-296-6600 TTY 206-296-7217 DROP-OFF COVER SHEET FOR LUSD ONL Y For alternate formats, call 206-296-6600. Drop-Off Cover Sheet for Land Use Services Division ••••••••••••••••• IMPORTANT ••••••••••••••••• DATE RECEIVED BY LUSD PROJECT NUMBER AND NAME IS NECESSARY FOR ALL DROP-OFFS Project No 1!o.0f;=PC-00 ( Project Name (J.... FvVkh. 53 FROM LeL. t)V6,Y\ V\ 0..""", ~+o.J); -k. + .i GtM =:> Company Name I Contact Person Telephone No _"",,:2ob=-,,-,,-·---L.,Z_c/-,---,7,,---. ~~1oL..lo<.J/_5"",-- TO ADDITIONAL INFORMATION REQUESTED BY KING COUNTY STAFF (please print) Short Plat I Plats Please specify item(s) dropped-off: Lot Line Adjustment Permit Please specify item(s) dropped-off: Right of Way Permit Please specify item(s) dropped-off: Clearing I Grading Permit -Additional information requested. Please specify item(s) dropped-off: Other: Pl~ :>' c' 1iI ., ..., II'> .~ => =-C>;' :~ ]", , co ;po :x ;::; .. Cl N ,.', , ." .... p ~" PLEASE NOTE: All drop-off item(s) will be logged into the computer under the project number, therefore, it is important that the top portion of this form is completed properly before you drop-off anything. Assistance in finding a project number can be provided by speaking to a Zoning/Land Use Technician. Your cooperation is important. Thank you. Check out the DOES Web site at www.kingcounty.govlpermits Drop-OffCoverSheet-LUSDOnlyFORM"doc Ig-cvs~ropoltpdf 06/29/2007 Page 1 011 TO: Habitat for Humanity of East King County PO Box 817 Redmond, W A. 98073 425-869-6007 -fax 425-883-8809 King County DDES 900 Oakesdale Ave SW Renton, Wa. 98057 Attn: Mike Meins WE ARE SENDING YOU COPIES DATE DAITACHED DSHOP DRAWINGS IxxlpRINTS DSAMPLES NUMBER DESCRIPTION: LETTER OF TRANSMITTAL DATE: 818108 IJOB# La Fortuna ,TIN Mike Meins "" Replacement TESC Sheet 3 of 9 Telephone: Fax: DUNDER SEPARATE COVER VIA DSPECIFICATIONS DcOpy OF LEITER DOTHER: DCHANGE ORDER _____ THE FOLLOWING ITEMS: 3 8/8/08 Sheet 3 of 9 TESC Plan THESE ARE TRANSMmED as checked below: REMARKS: IxxlFORAPPROVAL DFOR YOUR USE §AS REQUESTED DFOR REVIEW AND COMMENT DAPPROVED AS SUBMITTED DFOR BIDS DUE D DAPPROVED AS NOTED DRETURNED FOR CORRECTIONS DRESUBMIT DSUBMIT DRETURN COPIES FOR APPROVAL COPIES FOR DISTRffiUTION CORRECTED PRINTS D PRINTS RETURNED AFTER LOAN TO US Here you go Mike. This should satisfy the first part of the Plan Change. Any luck with the Access Road issue vs. the required recreation space. COPY TO: DR Strong; GMP Homes SIGNED: Lee Brannam 206-949-8813 W King County Department of Development and Environmental Services 900 Oakesdale Avenue Southwest Renton, WA 98057-5212 206-296-6600 TTY 206-296-7217 www.metrokc.gov Design Plan Change NOT TO BE USED FOR EARLY START To Be Completed by Land Use Inspection Section This plan change is for LandscapelRecreation/Street Tree: 0 o within the City of: ------------------Plan Change No. __ 1.../ ______ -=--=-:::--_ Plan Change Activity No. ~l."-'O"--'-1-'f_&=--I'-O_D __ SubmlttallntOnnatlOn: !WWr Upon completion of the review of the revisions, the reviewer shall notifY the design engineer: ~pIicant: Ene:ineer & License No.: D ' i<. J~ Address: p.o 8l}~ /+10 Address: (0604 Ne 3 9 \"I--R /a C£. C;tM~ U17 qgC).'7! . #-(0 I / I~'I'/c.{~ tJl/ ~ 9 0 S 3- Project Name: t.tJ.~ ~ Project No. 603Dc cro-t Site Address' 1,;:(& 3~ Fe:: ~e4wv,'p&~Inspect Activity No. /..-0:5..s I/14 On Oz / I .;2 /0 ')-, the following plan change to the approved plan was: (recommendC!d by DDES) (required by DDES) (requS%e d by applicant) ---" (j) If>., acce-n r~ II h-I!or-d or /(!N..ad ~ r~/n'4 /5 This Plan Change involves: o Roadway Plan & Profile ~inage Land Use Projects Oilly Project is: .• c;r;ecord~40 .not,.ecQmed , ," o Traffic o Materials Lab o Platting o Planner 0 Site Development Services (Grading) o Other The proposed change requires revised engineering drawings that must be submitted to the Department of Development and Environmental Services for approval: I Please call (206) 296-7137 when ready to submit_ Design changes must be made by a professional civil engineer registered in the State of Washington. Payment of fees and deposits are due as of the date of this plan change, late penalties (KCC 27.02.030) are applicable. Each submittal shall include three (3) sets of revised plans highlighted in green with a revision block and a symbol by each revision. The revision block must be dated and initialed by the professional engineer making the revision. A copy of this form will be mailed directly to the design engineer indicated above and shall be included with each submittaL • The review will be completed as soon as possible. Approval/denial will be directed to the persons indicated on the top of this form. ,...--.--- (U,z;~ Ih;.,/~ c21b fi"5J InspecrName antlPhone No. (please pr t) date Developer Representattve date te S:Current Form. DeSign Pan Change. doc 09-12-06 f!) v f3;:dA F--f A-C.-Ll:S'7:;;, TV ~ Of=- \J4vL-\ ' Cw-:::A0 OV\ Ar fJw ~6rt- ~~JwL Office Links Type: fC"omment Entlies mal ked byo :.. ale currsntbo In effect T cxt: Approved plan; with conditions ond retumed two signed sheets (C5) to M.Meins. Entered By: ~1';;;;;;;;;;;;;;;;;;;;;;;;;:::~~~;~~~~~ User Id: ~1'======'1----' Effective:1 711012008 Entered: LI ~-'-'-'-----' Thru: I 12/31/2020 TooIBarOr~ ~I~ Thursday, Jul 17, 2008 04:03 PM • Addendum to Technical Information Report for LA FORTUNA TOWNHOUSES King County Tax Parcel 0739000020 -Renton, Washington I EXF'lRES I" -/1-O"l DRS Project No. 06163.500 King County Project No. B03DC001 Owner/Applicant GMP Homes 11317 NE 1201h Street Kirkland, WA 98034 Report Prepared By Nadeem A. Khan Wl.11 D. R. STRONG Consulting Engineers, Inc. 10604 N.E. 38th Place, Suite 101 Kirkland WA 98033 (425) 827-3063 Report Issue Date March 10, 2008 Walter Shostak Subject: FW: La Fortuna Vault Attachments: TEMPL 1 BYP.doc; L 1BYP.bmp From: Walter Shostak Sent: Monday, November 26,20072:23 PM To: 'mike.meins@kingcounty.gov' Cc: 'Lee Brannam' Subject: La Fortuna Vault Hi Mike: Page 1 of 1 The control structure riser has 0.25' of freeboard instead of 0.5' as per design. I've confirmed that the other dimensions are within acceptable design tolerances. In order to provide the required freebcard I've re-analyzed the vault performance with 4.40' of detention depth (see attached). I propose to remove 0.35' from the top of the overflow riser, and re-drill the top orifice to be 1 3/8", leaving the bottom orifice at 1 3/16". The top orifice height would remain at 3.20'. The asbuilt vault would provide the required Level 1 flow control without further modification, since the vault already included some additional volume. The required detention volume with 4.40' of detention depth is 18,883 cu-ft and the asbuilt volume would be 19,400 cu-ft. If you have no comments or concerns, we will proceed with the modification and submit a revised asbuilt and volume certification for the vault. Thanks, D.R. STRONG Consulting Engineers Inc. CIVIL ENGINEERS PLANNERS SURVEYORS Please Note: Walter 1. Shostak, P.E. Project Engineer 10604 N.E. 38th Place Suite #101 Kirkland, WA 98033 Office: (425) 827-3063 Fax: (425) 827-2423 Tf: (800) 962-1402 The information in this E~mail message, and any files transmitted with it, is confidential and may be legally privileged, It is intended only for the use of the individual(s) named above. If you are the intended recipient, be aware that your use of any confidential or personal information may be restricted by state and federal privacy laws. If you, the reader of this message, are not the intended recipient, you are hereby notified that you should not further disseminate, distribute, or forward this E-mail message. If you have received this E-mail in error, please notify the sender and delete the material from any computer. Thank you. 3/10/2008 Retention/Detention Facility Type of Facility: Detention Vault Facility Length: 65.51 ft Facility Width: 65.51 ft Facility Area: 4292 . sq. ft Effective Storage Depth: 4.40 ft Stage 0 Elevation: 385.77 ft Storage Volume: 18883. cu. ft Riser Head: 4.40 ft Riser Diameter: 12.00 inches Number of orifices: 2 Full Head Pipe Orifice # Height Diameter Discharge Diameter (ft) (in) (CFS) (in) 1 0.00 1.17 0.079 2 3.20 1. 38 0.057 4.0 Top Notch Weir: None Outflow Rating Curve: None Stage Elevation Storage Discharge Percolation (ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs) 0.00 385.77 o. 0.000 0.000 0.00 0.01 385.78 43. 0.001 0.004 0.00 0.02 385.79 86. 0.002 0.006 0.00 0.04 385.81 172. 0.004 0.007 0.00 0.05 385.82 215. 0.005 0.008 0.00 0.06 385.83 258. 0.006 0.009 0.00 0.07 385.84 300. 0.007 0.010 0.00 0.09 385.86 386. 0.009 0.011 0.00 0.10 385.87 429. 0.010 0.012 0.00 0.20 385.97 858. 0.020 0.017 0.00 0.30 386.07 1288. 0.030 0.020 0.00 0.40 386.17 1717. 0.039 0.024 0.00 0.50 386.27 2146. 0.049 0.026 0.00 0.60 386.37 2575. 0.059 0.029 0.00 0.70 386.47 3004. 0.069 0.031 0.00 0.80 386.57 3433. 0.079 0.033 0.00 0.90 386.67 3863. 0.089 0.035 0.00 1. 00 386.77 4292. 0.099 0.037 0.00 1.10 386.87 4721. 0.108 0.039 0.00 1. 20 386.97 5150. 0.118 0.041 0.00 1. 30 387.07 5579. 0.128 0.043 0.00 1. 40 387.17 6008. 0.138 0.044 0.00 1. 50 387.27 6438. 0.148 0.046 0.00 1. 60 387.37 6867. 0.158 0.047 0.00 1. 70 387.47 7296. 0.167 0.049 0.00 1. 80 387.57 7725. 0.177 0.050 0.00 1. 90 387.67 8154. 0.187 0.052 0.00 2.00 387.77 8583. 0.197 0.053 0.00 2.10 387.87 9013. 0.207 0.054 0.00 2.20 387.97 9442. 0.217 0.056 0.00 2.30 388.07 9871. 0.227 0.057 0.00 2.40 2.50 2.60 2.70 2.80 2.90 3.00 3.10 3.20 3.21 3.23 3.24 3.26 3.27 3.29 3.30 3.31 3.33 3.43 3.53 3.63 3.73 3.83 3.93 4.03 4.13 4.23 4.33 4.40 4.50 4.60 4.70 4.80 4.90 5.00 5.10 5.20 5.30 5.40 5.50 5.60 5.70 5.80 5.90 6.00 6.10 6.20 6.30 6.40 Hyd Inflow 1 0.89 2 0.45 3 0.45 4 0.47 388.17 388.27 388.37 388.47 388.57 388.67 388.77 388.87 388.97 388.98 389.00 389.01 389.03 389.04 389.06 389.07 389.08 389.10 389.20 389.30 389.40 389.50 389.60 389.70 389.80 389.90 390.00 390.10 390.17 390.27 390.37 390.47 390.57 390.67 390.77 390.87 390.97 391. 07 391.17 391. 27 391. 37 391.47 391. 57 391.67 391. 77 391.87 391.97 392.07 392.17 Outflow 0.76 0.31 0.13 0.12 10300. 10729. 11158. 11588. 12017. 12446. 12875. 13304. 13733. 13776. 13862. 13905. 13991. 14034. 14120. 14163. 14205. 14291. 14720. 15150. 15579. 16008. 16437. 16866. 17295. 17725. 18154. 18583. 18883. 19313 . 19742. 20171. 20600. 21029. 21458. 21888. 22317. 227 46. 23175. 23604. 24033. 24463. 24892 . 25321. 25750. 26179. 26608. 27038. 27 4 67. 0.236 0.058 0.246 0.059 0.256 0.060 0.266 0.062 0.276 0.063 0.286 0.064 0.296 0.065 0.305 0.066 0.315 0.067 0.316 0.067 0.318 0.069 0.319 0.071 0.321 0.074 0.322 0.078 0.324 0.082 0.325 0.084 0.326 0.086 0.328 0.087 0.338 0.094 0.348 0.100 0.358 0.105 0.367 0.110 0.377 0.114 0.387 0.118 0.397 0.122 0.407 0.126 0.417 0.129 0.427 0.133 0.434 0.135 0.443 0.446 0.453 1.010 0.463 1.740 0.473 2.540 0.483 2.820 0.493 3.080 0.502 3.320 0.512 3.540 0.522 3.750 0.532 3.950 0.542 4.130 0.552 4.310 0.562 4.480 0.571 4.650 0.581 4.810 0.591 4.960 0.601 5.110 0.611 5.260 0.621 5.400 0.631 5.540 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Peak Stage Elev 4.55 390.32 4.46 390.23 4.38 390.15 3.96 389.73 Storage (eu-Ft) (Ac-Ft) 19548. 0.449 19131. 0.439 18789. 0.431 17003. 0.390 5 0.53 0.11 3.76 389.53 ~6128. 6 0.28 0.06 2.90 388.67 :2465. 7 0.41 0.05 1. 75 387.52 7501. 8 0.37 0.05 2.06 387.83 8827 . Hyd R/D Facility Tributary Reservoir POC Outflow Outflow Inflow Inflow 1 0.76 0.09 ***..,,**** 2 0.31 0.04 ..,,**..,,**** 3 0.13 0.04 ******** 4 0.12 0.05 ******** 5 0.11 0.05 ******** 6 0.06 0.03 ******** 7 0.05 0.04 ******** 8 0.05 0.04 ******** ---------------------------------- Route Time Series through Facility Inflow Time Series File:rdin.tsf Outflow Time Series File:rdout poe Time Series File:dsout Inflow/Outflow Analysis Peak Inflow Discharge: 0.892 Peak Outflow Discharge: 0.756 Peak Reservoir Stage: 4.55 Peak Reservoir Elev: 390.32 CFS CFS Ft Ft Target .."*****..,, ******.." 0.16 ***.."**..,, ******* 0.09 ******* ******* at 6:00 at 9:00 Peak Reservoir Storage: 19548. Cu-Ft 0.449 Ac-Ft Add Time Series:bypass.tsf Calc 0.83 0.34 0.16 0.14 0.13 0.09 0.09 0.07 on Jan on Jan 0.370 0.286 0.172 0.203 9 in Year 8 9 in Year 8 Peak Summed Discharge: 0.827 CFS at 9:00 on Jan 9 in Year 8 Point of Compliance File:dsout.tsf Flow Frequency Analysis Time Series File:rdout.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--------Flow Frequency Analysis------- Flow Rate Rank Time of Peak (CFS) 0.314 2 2/09/01 16: 00 0.054 7 12/28/01 17:00 0.111 5 2/28103 7:00 0.049 8 8126104 6:00 0.064 6 1/05/05 15:00 0.119 4 1/18/06 22:00 0.134 3 11/24/06 7:00 0.756 1 1/09/08 9:00 computed Peaks Flow Frequency Analysis Time Series File:dsout.tsf Project Location:Sea-Tac ---Annual Flow Rate (CFS) Peak Flow Rates--- Rank Time of Peak --Peaks - -Rank Return Prob (CFS) (ft) Period 0.756 4.55 1 100.00 0.990 0.314 4.46 2 25.00 0.960 0.134 4.38 3 10.00 0.900 0.119 3.96 4 5.00 0.800 0.111 3.76 5 3.00 0.667 0.064 2.90 6 2.00 0.500 0.054 2.06 7 1. 30 0.231 0.049 1. 75 8 1.10 0.091 0.609 4.53 50.00 0.980 -----Flow Frequency Analysis------- --Peaks Rank Return Prob (CFS) Period 0.337 2 2/09/01 16:00 0.827 1 100.00 0.990 0.072 8 1/05/02 16:00 0.337 2 25.00 0.960 0.127 5 2/28/03 5:00 0.159 3 10.00 0.900 0.085 7 8/26/04 2:00 0.141 4 5.00 0.800 0.087 6 1105/05 8:00 0.127 5 3.00 0.667 0.141 4 1/18/06 21:00 0.087 6 2.00 0.500 0.159 3 11/24/06 4:00 0.085 7 1. 30 0.231 0.827 1 1109/08 9:00 0.072 8 1.10 0.091 Computed Peaks 0.663 50.00 0.980 ""' (I) u. t) '-' 1001-lr<>---~-o-u-tP-k-5-i-n-S-e-a-_T-a-c----------------------------------~~----------------~~--------~~------~--------~----­2 Return Period 5 10 20 50 100 + (> on + dsoutpks <> PREOEVpks • BYPASSpks R Q + t " (> " ~ <> <> <> • f 10~1 " • 00 • + (, <> • + <> • <> • • • (> 10-·~!~--~-------.------'-------~-----.----r----.----.----.-----.-------'------.-------.----. 2 5 10 20 30 40 50 60 70 80 90 95 98 99 Cumulative Probability W King County Department of Development and Environmental Services 900 Oakesdale Avenue Southwest Renton, WA 98057-5212 206-296-6600 TTY 206-296-7217 www.metrokc.gov Design Plan Change NOT TO BE USED FOR EARL Y START To Be Completed by Land Use Inspection Section This plan change is for LandscapelRecreation/Street Tree: D D within the City of: _________ _ Plan Change No. I Plan Change Activity No. SubmIllal IntormatlOn: Upon completion of the review of the revisions, the reviewer /W W/ shall notify the design engineer: Applicant: Engineer & License No.: D . if... f ~ Address: (7.0 8"f)~ /+qo Address: /0 GoLf Ale 3 9 ~ IYacc. <;lM>t~ IJfr '1 gc)'7 ( IF /0 I / Ie::., 'dc!~ i..J1I '(90s.J, Project Name: L tJ ~ ~ Project No. 60:$ D L cr&t Site Address' /;)(o;i!..l Fe' jle/hfn,,/?& ~InspectActivitYNo. Los ::,I/I?j On q / I ;l /0 7-, the following plan change to the approved plan was: (recommendlci by riDES) (required by DDES) (requssted by applicant) D !i'1 acct?4-0 I~ I! h-Uwtf oY ,Ie....ad F 1"O/Ylc.4 /5 Reason for Change/Code Citation: (j) 1<:;'11 leeS' w () H ~. 3 i-l Y :;. 3 5 I C IJ ~ W"~~ fi(( Clt#d ~I /, b., This Plan Change involves: D Roadway Plan & Profile ~ainage I1A f;.JJ Land Use Projects Only / Project is: ~ecorded 0 not recorded D Traffic D Materials Lab D Platting D Planner D Site Development Services (Grading) D Other The proposed change requires revised engineering drawings that must be submitted to the Department of Development and Environmental Services for approval: I Please call (206) 296-7137 when ready to submit. Design changes must be made by a professional civil engineer registered in the State of Washington. Payment offees and deposits are due as of the date of this plan change, late penalties (KCC 27.02.030) are applicable. Each submittal shall include three (3) sets of revised plans highlighted in green with a revision block and a symbol by each revision. The revision block must be dated and initialed by the professional engineer making the revision. A copy of this form will be mailed directly to the design engineer indicated above and shall be included with each submittal. , The review will be completed as soon as possible. Approval/denial will be directed to the persons indicated on the top of this form . ..-- (u"z, ate q i-</o T date Developer Representative date S:Current Form. Design Pan Change. doc 09-12-06 soc ® King County Department of Development and Environmental Services 900 Oakesdale Ave SW Renton, Washi%>1on 98055-1219 September 21, 2007 Page 1 of 1 Summary of Charges and Payments r~~~ .... ~. . ~.~ ... -~ .... -~ .. -.--~ .. ~~.-.-.~ .. --~ .. ~--.-_ .. _._. -, .... -""--.---~ .~.~ ............. ~~~ .. ~-.~ ... __ ..... -.~. Applicant: LA FORTUNA LLC CIO KARL BEST P. O. BOX 1790 SNOHOMISH, WA 98291 425-397-0739 Char es Description Deposit Based on Est Hrs Site Inspect Counter Fee SUB TOTAL CHARGES: Payments Description Check # SUB TOTAL PA YMENTS: BALANCE: Checklogid Payee .• Number: ~J' Number: Development Number: Permit Type: Status: Date Entered L07PCI05 XOOOl279 CHANGE PENDING Amount $1,400.00 $205.28 $1,605.28 Amount $0.00 $1,605.28 iThe fees shown above represent current charges as of this date and are an estimate based on the information iprovided to DOES at the time of application. , IFor selVices that are rendered on an hourly baSiS, the cost of those services will be based on the actual hours worked. Hourly fees are charged at the rate in effect at the time of service. and will be billed monthly, along with lany other outstanding fees. iFees that have been posted prior to permit issuance will be collected at that time. Fees subsequently posted will be ;billed to the applicant. All fees must be paid in full before DOES issues Final Approval, T.C.O. or C.O . ..... _ ........... . Denis Law " __ ~M:aYor~ ___ fIIII'~rtt ~, City of frJJIDJ1 April 23, 2013 Department of Community and Economic Development C.E. "Chi p"Vi ncent, Ad min istrator Lee Brannam Habitat for Humanity 16315 NE 87th ST Ste. B-5 PO Box 817 Redmond, WA 98073-0817 Subject: Request for Second Annual Monitoring Report La Fortuna Wetland Mitigation City of Renton File No.lWA09-066' Dear Mr. Brannam: This letter is to inform you that as of the date of this letter, I have not received the second annual maintenance and monitoring report for the La Fortuna mitigation project that was due to the City on January 1, 2013. Please send two copies of the report to my attention, by May 14, 2013 or this matter will be referred to our Code Compliance Inspector. If you have any questions please feel free to contact me at (425) 430-7219. Sincerely, 2~~ Current Planning Division cc: City of Renton File LUA09-066 Ryan Kahlo -The Watershed Company Renton City Hall • 1055 South Grady Way • Renton, Washington 98057 • rentonwa.gov W King County Department of Development and Envi.ronmental Services 900 Oakesdale Avenue Southwest Renton, WA 98057-5212 206-296-6600 TrY 206-296-7217 www.metrokc.gov June 11, 2008 Karl Best P.O. Box 1790 Snohomish, WA 98291 RE: King County Project Number __ ---'L"'o<J7"'P~C"_'I"'0"'5 ______ _ Project Name ____ ~----L""aF""-'o"'rt"'un""'a!...T!.:o"-wnh""""'o"'m""'es"---- Dear Mr. Best: Thank you for the May 1, 2008 application for Plan Change No.1 for the LaFortuna Townhomes commercial site development permit issued under DDES Activity No. B03DCOO 1. The purpose of this letter is to notifY you that the Site Engineering and Planning (SE&P) Section, Building Services Division, has reviewed the engineering submittal prepared by D.R. Strong Consulting Engineers, Inc. and dated Nov. 14,2007. The following list sununarizes site engineering issues that must be addressed in your next submittal. I) Please include a detail illustrating the proposed 6-inch perforated interceptor drain with respect to the standard rockery detail on sheet C8, which shows a l2-inch perforated drain behind the wall. 2) Please secure and record a temporary construction easement agreement with the adjacent property owner reflecting the proposed offsite work along the north central property line as indicated by the following note on plan sheet C6: "Drain Offsite Low Area to Temp. Interceptor Drain". Once recorded, please inform DDES of the recording number. In addition to any submittal requirements noted in the comments, please submit three (3) copies of corrected plan sheets to the Permit Center, 900 Oakesdale Ave SW, Renton, WA 98057-5212. All review comments must be addressed before the engineering plans can be approved. Due to the nature of the comments, further review is necessary. Karl Best June I I, 2008 Page 2 Thank you again for your permit application. If you have questions regarding these comments, please contact me at 206-296-7207 or david.ratte@kingcounty.gov. Sincerely, David M. Ratte, P.E. Engineer III, Site Engineering and Planning (SE&P) Section, Building Services Division cc: Walter 1. Shostak, P.E., D.R. Strong Consulting Engineers, Inc Mike Meins, Engineer II, Land Use Inspections Section, Land Use Services Division