Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutReport 1� E'nstaga
certltiod Fee
Retum Receipt Fee
� (EndarsemeM HequlreC)
M Rest irted 4elivory Fee
(Fndaesement Required)
Postmark
Here
0
Totai
w Postage & Fees
�.n
LY,
r�
f I�V,o- 7 0 viz�1�°rr rr.
3ostal Servicer.
TInFn MAIL. RECEIF
Er
Postage $
r�
Certified Foe
M Postmarks
Return Receipt Fee Here
(Endorsement Required)
a Restricted Delivery Fee
(Endorsement Required)
ED
Ft
LnTotal Postage & Fees
>I
Sent To �I
pr. 55..
-A---N--o-.;----- ------ - --
Straet,
or PO Bax No.
`}
�fT at�sC
PIS Form :rr August 2006 See Reverse for Instmclions
(UOMeStIC Mar! U
For delivery inform+
© Postage S
r-1
Certified Foe
M Postmark
C3 Return Receipt Fee Hem
© (Endorsement Required)
E:3 Restricted Delivery Fee
(Endorsement Required)
O
rn
LnTotal Postage & Fees $
r-3
Sent To
ra 6
......................... �-_____�________-__.__.__.__.-____---....._....._....---.-___
Street, Apt. No.; ♦ yh,
C3 or PO Box No. 3.- ♦„ h �a? +i vi hl
N 1.... �-.hr! _ .._..
C4,, State, IIP+4
PS Farm :rr August 2006 See Reverse for Instructions
t --
Q'
>O
r—1
:wbm C ir. No trtsurence COverW Prrn+i_t f �
Postmark
ED 'return Receipt Fee Here
E3(F7rlorsom(!nl Reyo'�. red)
Rcslrictcd Dcl':vn�j Fee
(Endorsement Required)
l�
Tota', Postaga & Fees
a
ra Sent To
--- -- -------------- `�'� ..= !"1� r .a -----------------------------------
L:3 Stree., Apf. No.;
or PD Box Na. -----un{at--- -N{----------------.._._----
City, State, 71P+J '
PS Form :rr August 2006 See Reverse for Instruclio
(Domestic Mail only; Nc
Far delivery irNormatlon vis
Postage $
rl
Ceri ied Fee
M Postmark
1--3 Return Receipt Fee Here
0 (Endorsement Required) ;l
© Restricted Deiivery Fee
(Endorsement Required)
O
� Total Postage & Fees
r -i
Sent To a
r-�-•-•-•-----------------4�5!,L----y---a
Sheet, Apt. No.;
or PO Box Na. vQ N E
t' ---- ----- ... s.._ ..._.
City, Sfafe, 21P+4
�.t,,,4�-, �••! A �&051.
PS Form :rr August 2006
(Oomestrc Men unry; mo insurance [:overage t-rc
For delivery information visit our website at www-usps.i
it
Postage $
.-0
r -i
Certified Fee
rn Postmark
L3 Return Receipt Fee Here
I3 (Endorsement Required)
C:3 Restricted Delivery Fee
(Endorsement Required)
C3
h
trI Total Postage & Fees
r'4
Sent To rr� f
�..tuy.-.1� L! �. ----------
or PO Box No.
r`- - wsn>M�.a ............ .......................
Cry, Siete, IIP+4
Evh
wLt, M Q$ @ -
800PS Form 3. August 2006 See Reverse for Instrucliort.-O
stal.
Services
FCE
FIED
MA1LTt
RECEIPT
Ma
[.�nfq; Noln�uretKae
cbvsmgee
P.ruvicietij
vitt
at wtwlr uspa.aotrt®
Mfortm
mn our
website
� E'nstaga
certltiod Fee
Retum Receipt Fee
� (EndarsemeM HequlreC)
M Rest irted 4elivory Fee
(Fndaesement Required)
Postmark
Here
0
Totai
w Postage & Fees
�.n
LY,
r�
f I�V,o- 7 0 viz�1�°rr rr.
3ostal Servicer.
TInFn MAIL. RECEIF
Er
Postage $
r�
Certified Foe
M Postmarks
Return Receipt Fee Here
(Endorsement Required)
a Restricted Delivery Fee
(Endorsement Required)
ED
Ft
LnTotal Postage & Fees
>I
Sent To �I
pr. 55..
-A---N--o-.;----- ------ - --
Straet,
or PO Bax No.
`}
�fT at�sC
PIS Form :rr August 2006 See Reverse for Instmclions
(UOMeStIC Mar! U
For delivery inform+
© Postage S
r-1
Certified Foe
M Postmark
C3 Return Receipt Fee Hem
© (Endorsement Required)
E:3 Restricted Delivery Fee
(Endorsement Required)
O
rn
LnTotal Postage & Fees $
r-3
Sent To
ra 6
......................... �-_____�________-__.__.__.__.-____---....._....._....---.-___
Street, Apt. No.; ♦ yh,
C3 or PO Box No. 3.- ♦„ h �a? +i vi hl
N 1.... �-.hr! _ .._..
C4,, State, IIP+4
PS Farm :rr August 2006 See Reverse for Instructions
t --
Q'
>O
r—1
:wbm C ir. No trtsurence COverW Prrn+i_t f �
Postmark
ED 'return Receipt Fee Here
E3(F7rlorsom(!nl Reyo'�. red)
Rcslrictcd Dcl':vn�j Fee
(Endorsement Required)
l�
Tota', Postaga & Fees
a
ra Sent To
--- -- -------------- `�'� ..= !"1� r .a -----------------------------------
L:3 Stree., Apf. No.;
or PD Box Na. -----un{at--- -N{----------------.._._----
City, State, 71P+J '
PS Form :rr August 2006 See Reverse for Instruclio
(Domestic Mail only; Nc
Far delivery irNormatlon vis
Postage $
rl
Ceri ied Fee
M Postmark
1--3 Return Receipt Fee Here
0 (Endorsement Required) ;l
© Restricted Deiivery Fee
(Endorsement Required)
O
� Total Postage & Fees
r -i
Sent To a
r-�-•-•-•-----------------4�5!,L----y---a
Sheet, Apt. No.;
or PO Box Na. vQ N E
t' ---- ----- ... s.._ ..._.
City, Sfafe, 21P+4
�.t,,,4�-, �••! A �&051.
PS Form :rr August 2006
(Oomestrc Men unry; mo insurance [:overage t-rc
For delivery information visit our website at www-usps.i
it
Postage $
.-0
r -i
Certified Fee
rn Postmark
L3 Return Receipt Fee Here
I3 (Endorsement Required)
C:3 Restricted Delivery Fee
(Endorsement Required)
C3
h
trI Total Postage & Fees
r'4
Sent To rr� f
�..tuy.-.1� L! �. ----------
or PO Box No.
r`- - wsn>M�.a ............ .......................
Cry, Siete, IIP+4
Evh
wLt, M Q$ @ -
800PS Form 3. August 2006 See Reverse for Instrucliort.-O
U.S. Postal ServiceTU
CERTIFIED MAIL,,,
RECEIPT
ru Momesuchfall Only, No Insurance coverage Provided)
Fri
C7 OiJK
ED
C€ 7vey
age
r�
ee
rn
p Relse Posunad[
© (Endarsod) Here
3 Restricee(Fndorseed)
C]
Ct
Lrl Toter Postago &Fees
e -i
--------------------
Senr To
r�
r�
A ----••...................
Street, A t.
nr PO Box No.
f" ---- ---- -----
----------------�''__L..._.v_.-•t ,._.._
Crty, State, 2lRr4 1 t
Postal
CERTIFIED MAIL,,,
RECEIPT
f1t(DomesticOnly,Mail
Insurance Coverage Provided)
nj
IT' ,
O
•� Postage $
r�
Cerllffed Fee
M
C3 Rotum Receipt Fee Postmark
C3 (Endarsement Required) }sere
F-3 Restricted Delivery Fee
O (Endorsement Required)
Lo Total Postage $ Fees '
,-R
Se, To
Stre6f, Apf. NO,; _•.�_1LA____�;::_'SC �!....................
or PO Sox No
Crty Sfafp, ZlP+4
heti}„. 1,1A X8056 ........
Postal
CERTIFIED MAILT,, RECEIPT
Li) (Domestic
tu•j No • - r
LO
c`”
O
D Postage $
r�
Certified Foe
1TI
Q Return ReceiptFee Postmark
Q {Endorsement Required) Hero
C3 Restricted Delivery
M Fee
(EndorsemenlRequirod)
f"-
t17 Total Postage & Fees
r•i
Sent To
Street„dpt Np.;
© or PO Box No.
City Sfafa, Z1P+4---------------
----•--••..................
R-t� �••,: 1.11} Q ti�S �
:rr rr.
+
r-9
1
IT -
0
--Q Postage 5
,-i
Certified Fee
fit
Q Return Fteceiot Fee Postmark
C7 (Endorsement Repuirod)
p Here
Restrigtetl Delivery Fee
13 (Endarsement Required)
fti
U 1 Total Postage & Fees
r -R
Sent To
Apt N4., -----------•---`---'-i.�?::� __..._
Q or FO Box No. .••._.._
.._.. ..
emy stats,-zra+a ”-...__..._ --- l-=�P�.a,._�}�4_.N-t
p......-
--
. [Domestic Niall Only, No
.� For deiivery Information nisi
EF-
Postal
CERTIFIED MAIL,,,
RECEIPT
Postage
(Domestic Mail Only, No insurance
Coverage,=
r -i
C1
_
MCertified
©
Gl
Pos 4
Here
C3
Iy
PaF
a
L
Restricted Delivery Foe
'y
y
Cartlf-ietj
(Endorsement Required)
Return Receiostmark
Ln
Q
(Endorsement ReqHere
C]
Restricted Delive(EndorsementReqC3r.r7
Sent To
-Z
/
_ ^ri..I._._y_._'`.1.`: V'.J___
�r
StreeY,
Total Postage &
or PO Box No. f
°1
'9
---------- --- --- ------.. _.._� .......
City, Stafe, ZIP+4'-------------------------------
P -thew, Wf4 R$51.
PS Form :rr August 2006 See Reverse
Sent To
r--3
ra
r r tt nr
--•-------------------------- � 3Uil�iu T,S ASI_._..
C3
Street,
or PO Sox Np. 7
-•---- 0• N
-----S-•---------• 1.---'
----•---••-----._..� -•-----..
..................................................
Gily, Sfafe, 2rP+4
RekZ� WA
4g�SC
. [Domestic Niall Only, No
.� For deiivery Information nisi
EF-
,.
E:7
-c
Postage
$
r -i
Fee
MCertified
©
Retum Receipt Fee
Pos 4
Here
C3
(Endorsement Required)
a
L
Restricted Delivery Foe
'y
y
(Endorsement Required)
Ln
Total Postage & Fees
r -q
Sent To
-Z
/
_ ^ri..I._._y_._'`.1.`: V'.J___
�r
StreeY,
or PO Box No. f
°1
f'
---------- --- --- ------.. _.._� .......
City, Stafe, ZIP+4'-------------------------------
P -thew, Wf4 R$51.
PS Form :rr August 2006 See Reverse
for Instructions
Certified Fee
M
Postmark
ED tieir:m Heceipi Fee Here
O (Endorsement Required)
EJ
Restricted Delivery Fee
0 (Endorsement Required)
Ln Total Postage $ Fees
r-�
Seat To ll A
-----------------------r-�7"___��___JC.,ori`7__i_RYS.�iGr-----__-___-„---
Street, Apt. Na.;
or PO Box No.
-------------------------------------'¢ -� . rLvt N,_-•--•--------------------
City, State, ZlP+4
�th4t uA k9br L
PS Form :rr August 2006 See Reverse for Instructions
"■ (uomestic Mail Only; No Insurance Coverage Pre
For delivery information visit our website at www.usps.r
Q'
Postage $
r -R
Certified Fee
M Postmark
C3 Return Receipt Fee
(Endorsement Required) 9 Herd
C3 Restricted Delivery Fee 415
(Endorsement Required)
O
� Total Postage & Fees s
r -i
Sant To
Street Apt. No.;
1117�Q orP08oxNo. .__ 35-_.N....d!iL_5�'
Cry, state, z�P+4
PS Form
:rr August 2006 See Reverse for Instructions
(Domestic Mail C
For delivery inform
Er
=1
`p Postage $
r-=5
Certified Fee
rr] A stark
Return Receipt Fee Here,.
C3 {Endorsement Required)
p Restricted Delivery Fee
(Endorsement Required)
C3
LnTota! Postago & Fees
rR
Sent TO
r-1 d
r-�-----�l��y�!2:_.l_.�e,....:...SPthLir
© Sfreet,,got. No.;
or PO Box No. b t. �r "__}
f� -
-
--------------
-------- ---._IdY.'— ---------------------------
Grty State, 7fP+4 P th I + d h ry �} 4 � y
PS Form rr rr. See Reverse for Instructions4
. Domestic
AW Only;
No lnsur&nm Covina e.?rov j
U.S.
Postal
'For",
11
CERTIFIED
0Wmatlo"
vleit our Wabeft,fift"MMLISPLOWiia
MAIL, RECEIPT
(Dw nnft
&Wt
Only;
No trfeurarme
Coverage Provided)
rf=ar dell”
lrritormation
visit our website
at www.usps
Certified Fee
M
Postmark
ED tieir:m Heceipi Fee Here
O (Endorsement Required)
EJ
Restricted Delivery Fee
0 (Endorsement Required)
Ln Total Postage $ Fees
r-�
Seat To ll A
-----------------------r-�7"___��___JC.,ori`7__i_RYS.�iGr-----__-___-„---
Street, Apt. Na.;
or PO Box No.
-------------------------------------'¢ -� . rLvt N,_-•--•--------------------
City, State, ZlP+4
�th4t uA k9br L
PS Form :rr August 2006 See Reverse for Instructions
"■ (uomestic Mail Only; No Insurance Coverage Pre
For delivery information visit our website at www.usps.r
Q'
Postage $
r -R
Certified Fee
M Postmark
C3 Return Receipt Fee
(Endorsement Required) 9 Herd
C3 Restricted Delivery Fee 415
(Endorsement Required)
O
� Total Postage & Fees s
r -i
Sant To
Street Apt. No.;
1117�Q orP08oxNo. .__ 35-_.N....d!iL_5�'
Cry, state, z�P+4
PS Form
:rr August 2006 See Reverse for Instructions
(Domestic Mail C
For delivery inform
Er
=1
`p Postage $
r-=5
Certified Fee
rr] A stark
Return Receipt Fee Here,.
C3 {Endorsement Required)
p Restricted Delivery Fee
(Endorsement Required)
C3
LnTota! Postago & Fees
rR
Sent TO
r-1 d
r-�-----�l��y�!2:_.l_.�e,....:...SPthLir
© Sfreet,,got. No.;
or PO Box No. b t. �r "__}
f� -
-
--------------
-------- ---._IdY.'— ---------------------------
Grty State, 7fP+4 P th I + d h ry �} 4 � y
PS Form rr rr. See Reverse for Instructions4
,B Postage E $
r--1
CeRffied Fee
M Postmark
© Return Receipt Fee
C:3(Endorsement Required) Here
C3 Restricted Delivery Fee -'
(Endorsement Required)
u-) Total Postage & Fees [. ;
rf,
5freet, Apt. No,; .......................................
or PO Box No,
N-----------�... ...9--- 1}..-.._-•-----------------------
cry, State, ztP+4 ---
tthfr'Wh 1Rt56
:tr August 2006 See Reverse for Instructions
luomesuc matt uniy; ivo insurE
Fvr delivery information visK our w
Postage $
r -i
Certified Fee
0 Fistum Receipt Fee gtmark
(Endorsement Required)
Restricted Delivery Fee
(Endorsoment Required)
C]
i1
u7 Total Postage & Fees
r -F!
Sent To
r -R
street, Rpf. No.;
or PO Box No. ty
--•-----------------------
-
Crty, S-tate, Z--fP+4--------
ZEE jl.,+ WR
PS Form :rr August 2006 See Reverse for Instructions
td(Domestic Mail Only; No Insuran
For delivery information visit our wet
rrer�
Certified Fee
Trl Postmark
M Return Receipt Fee Hera
M {Endorsement Required)
M
Restrided Delivery Fee
(Endorsement Required)
T1-
ul Total Postage & Fees $
rq
Sent To r
- roSS 1 do t� Y
C3 Streaf, Apt. No.;
or PC Box No. � ----------------
--------------------
Stare, ZIPr4
PS Form :rr2006 See Reverse for Instructrarrs
U.S.
Postal
Servicertm
CERTIFIED
MAIL, RECEIPT
(Dw nnft
&Wt
Only;
No trfeurarme
Coverage Provided)
rf=ar dell”
lrritormation
visit our website
at www.usps
ea
,B Postage E $
r--1
CeRffied Fee
M Postmark
© Return Receipt Fee
C:3(Endorsement Required) Here
C3 Restricted Delivery Fee -'
(Endorsement Required)
u-) Total Postage & Fees [. ;
rf,
5freet, Apt. No,; .......................................
or PO Box No,
N-----------�... ...9--- 1}..-.._-•-----------------------
cry, State, ztP+4 ---
tthfr'Wh 1Rt56
:tr August 2006 See Reverse for Instructions
luomesuc matt uniy; ivo insurE
Fvr delivery information visK our w
Postage $
r -i
Certified Fee
0 Fistum Receipt Fee gtmark
(Endorsement Required)
Restricted Delivery Fee
(Endorsoment Required)
C]
i1
u7 Total Postage & Fees
r -F!
Sent To
r -R
street, Rpf. No.;
or PO Box No. ty
--•-----------------------
-
Crty, S-tate, Z--fP+4--------
ZEE jl.,+ WR
PS Form :rr August 2006 See Reverse for Instructions
td(Domestic Mail Only; No Insuran
For delivery information visit our wet
rrer�
Certified Fee
Trl Postmark
M Return Receipt Fee Hera
M {Endorsement Required)
M
Restrided Delivery Fee
(Endorsement Required)
T1-
ul Total Postage & Fees $
rq
Sent To r
- roSS 1 do t� Y
C3 Streaf, Apt. No.;
or PC Box No. � ----------------
--------------------
Stare, ZIPr4
PS Form :rr2006 See Reverse for Instructrarrs
Postal Servii
TIMM MZ
.■ {pOlf:B$tic
mi unfy; No Insurance. uaverfil rivirn va
Postal
Servicil
For ct fivyr
ipfortrradonvyt 1t our webalts at wwrw.usp&il
V
r1 Cortitied Fee
1- --_-.-.__p.-_ —_
� Postage
Centied Fee
M Postmark
Return Receipt Fee Here
(Fndcmement Required))
C7 Restricted Delivery Fee 1
(Endorsement Required)
EJ
lti Totai Postage & Fees
U-)
r -q
Sent TG
-------------------------------------------- I r� Street, Apt. No.; #�
M or PO Sox No. }}
City, State, ZIP+4 j l r� � x� f! y �] `' S
w
PS Form :11 August 2006
Ir
M Postage $
' 1 Certlfied Fee
CTM postmark
� Return Receipt Foe }ire
(Endorsement Required)
C1 Restricted DeAvery Fee
(Endorsement Requ red)
L'I
Total Postage & Fees
rm`l
Sant TO _
a-------------------------------------
r 9 Street, AAL No.;
L7 or PO Box No.
�e NF..........................
17, --------------- Al o SL
Crty Stats. 2fF+4 �
U.S. Postal Servicl
CERTIFIMAI�Tmrll EIPT(Domestic 7�D
only; No Iuverage Provided)
For dell rmation visit our website at www.usps-came
r
Certlfied Fee
M Postmark
C3 Return Receipt Fee Here
M (Endorscmont Required)
O
Restricted Dell Fee
© (Endorsemcnt Required)
[`
Ln Total Postage &Fees
Fyf"
E = ----
C3'-=-x------------------------------------------------
O ptNoOXNO.{1 0; -----------------------------------
ate, ZfP+4�hy q ^ �W A u 9 tS ry �,
�l -
U.S.
Postal
Servicil
V
r1 Cortitied Fee
MAILT. RECEIPT
frl
Return Receipt Fan
t��q tmark
'W
fil tla Mail
only; Na Insurance
Coverage Provided)
CERTIFIED
fl
MAILTM RECEIPT
ED Restricted Qolivery Fee
(Endorsement Required)
�uery injonnation
visit our wabsfle
at wwrw.usps.come
Coverage
Provided)
(Domestic
Mail
only;
No Insurance
website
at www.usps-com,;,
For deill
information
visit our
Ir
M Postage $
' 1 Certlfied Fee
CTM postmark
� Return Receipt Foe }ire
(Endorsement Required)
C1 Restricted DeAvery Fee
(Endorsement Requ red)
L'I
Total Postage & Fees
rm`l
Sant TO _
a-------------------------------------
r 9 Street, AAL No.;
L7 or PO Box No.
�e NF..........................
17, --------------- Al o SL
Crty Stats. 2fF+4 �
U.S. Postal Servicl
CERTIFIMAI�Tmrll EIPT(Domestic 7�D
only; No Iuverage Provided)
For dell rmation visit our website at www.usps-came
r
Certlfied Fee
M Postmark
C3 Return Receipt Fee Here
M (Endorscmont Required)
O
Restricted Dell Fee
© (Endorsemcnt Required)
[`
Ln Total Postage &Fees
Fyf"
E = ----
C3'-=-x------------------------------------------------
O ptNoOXNO.{1 0; -----------------------------------
ate, ZfP+4�hy q ^ �W A u 9 tS ry �,
�l -
Er
ED Postage $
.A —..
a
Certirod Fee
M Postmark
Q Peturn Receipt Fee Here
lZZI {Endorsement Required)
Q Restricted Cauvery fee
(Endorsement Requirl:d)
0 —..
N Total Postage & Fees
IXI
Sent To
a ------- `�-a `-_Ss +t._ :._A��:: -----------------
Slrset, Apt. No.;
Or PO Box No.=--......._ -------------------------
City Sfate. Z1P+4 ti, A $ 05 `l
RCh un
IRS Form
:14 August 2006
Er
Postal
ServicerR,RTIFIED
V
r1 Cortitied Fee
MAILT. RECEIPT
frl
Return Receipt Fan
t��q tmark
'W
fil tla Mail
only; Na Insurance
Coverage Provided)
fl
ED Restricted Qolivery Fee
(Endorsement Required)
�uery injonnation
visit our wabsfle
at wwrw.usps.come
Er
ED Postage $
.A —..
a
Certirod Fee
M Postmark
Q Peturn Receipt Fee Here
lZZI {Endorsement Required)
Q Restricted Cauvery fee
(Endorsement Requirl:d)
0 —..
N Total Postage & Fees
IXI
Sent To
a ------- `�-a `-_Ss +t._ :._A��:: -----------------
Slrset, Apt. No.;
Or PO Box No.=--......._ -------------------------
City Sfate. Z1P+4 ti, A $ 05 `l
RCh un
IRS Form
:14 August 2006
Er
E3 Postage
..o
r1 Cortitied Fee
frl
Return Receipt Fan
t��q tmark
'W
ED (Endorsement Required)
(Endorsement
fl
ED Restricted Qolivery Fee
(Endorsement Required)
ED
fL Total Postage & Fees
Ll1-_f
Sent 7a
`a F"x_.�4v�j------------------------
rq Street, APt. No.;
Q or POBOxNo......
k
r- City, State, ZfP+4
tniun PS Form �1 g8a5L
:rr 11• See Reverse for Instructions
(Domestic Mail C
For deliverytill
inform
a
-� Postage $
Certified Fee
M
-Postmark
© Return ROcatpt Fee Here
O (Endorsement Required)
C'77
Restricted Delivery Fee
Q (Endorsement Required)
i
1 Total POstago & Fees
r=1 Sant TO 7
r -i .-.----- _t3 :^.yJ'-:...... 1-------------------------------------------
O Street, Apt. NO.;
l Or PO BOx
City State, ZIP+4 �Lt f ll UA
PS Form :Ir August 2006 See Reverse for Instructions
amwwoest►c.:Mt 1l.
r Far [�eltv�r 1
a
EF- -
Postage
CeltiPEed Fee
M Postmark
p Return Receipt Fee
I] (Fndarsement llequir(A) I Here
O Restricted Dalivery Spee
C.1 fcnMfr ement Rr„quired)
N
u-] Tota' Postage & Feas
r^�
�Sent To
------__,•_-------'----=t'_1--------
'� Srreet,Apt.No.; / ._.------•------------------'
r --) or po Box No.
g...� ,,,mm__A�e N�--------
Glry, SYate, Z1P+-0 � - .......••_ _ .................
I' -t d- W R alta SL
PS Fomr :,r August 2DO6 See Reverse for Instructions
..
vt11I II-ItU MAIL,, RECEIPT
(DOMWIC Mail Only, No Insurance Coverage Provided)
For delivery inlormelion visit our website nt unuor rr-
-11
w
Postage $
,-R
M Certified Fee
M Return Receipt Fee Postmark
M(Endorsement Required) Hera
Restricted Delivery Fee
O (Endarsement Required)
iti
u-3Total Postage & Fees
r.zf Sent To
r� q
1
Ostreet, Apt. No.: C-�•I---------------------------------
rpOO- or PO sox No. --.4�__Awl.•-C'k--------------------
Cify, Stare, ZlP+4------•-•--
4n00' I.r R )3b 5l
PS Form :1, August 2006
.o
CERTIFIED
I= '• OnlY, No Insurance Coverage Provided)
r-3
n�
.11 Postage $
r1
Certified Fee
M FOetmerk
C3 Retum Receipt Fee
� (Endorsement Required)
Restricted delivery Fee
(Endorsement Required)
Q
Total Postage & Fees $
r-3
Sent To
I-
i.' ny7... ::L]�.__u t5.... 4h..... .............
b;freel; Rpt. No.;
or PO Box No. ^
--- -- .._.. �-...o!. w a pr.... . N�..................
ary scare, rfP+a
Rtl�b” w N ego6
PS Form :rr2006 See Reverse for Instructions i
u
,,,� Postage
CertifieY Feu
E 1 POS -mark
EM
Return Reneipt Fee
(E"c'semnnt Required) Here
Restricted Delive y Fee
(Endorsement Required}
Ln Total Postage & Fees
r -q
rq Sent T4
Street,Apt. No.; -
or PO Box 17
No.
Ctty, Sfare, zrP+4 upp t ------ ..---------•-----------•-
Q[+��rh
:rl 11.
(Domesdc Mail Only; No insurance Coverage Provided)
w For delivery information visit our website at www.usps.com®
w
w
Certified Foe
M
C3 Return
Return Receipt Fee Here
M (Endorsement Required)
O
Restricted Delivery Fee
r3 (Endorsement Required)
r`
U1 Total Postage & Fees
r-3
r=I Serif To
--------------
Sfreat,�pt No ..
or PO Box No. 9 (r Z
----------------------------------- =-~-----------
---------------------------------
City, Slater Zip+4
PS Form �ttifi-, w R �$s 5U
:1, August M06
M (Domestic Mail G
13-
IT-
-a
rIT'
-o Postage $
r-3
Certified Fee
M
M Postmark
Return Receipt Fee Here
M (Endorsement Roquired)
ED
Restricted Delivery Fee
M (Endorsement Required)
C�
Lf) Total Postage & Fees
1�
Sent To
---------- "--'A�--- _--------------
Cj Street, Apt. No.: ------------------
f- or PO Box No. ; q 1{ +Z N
------------------------`� i'
city, stare,rrP+aee 44 rt pp -------------------------------
A.i.hZJn W '16�rj1
PS Form :,1 August 2006 See Reverse for Instrucli.ra
-■ (aomesrfc flsau Unir, r o insurance coverage mitate ae
For delivery infounation visit our webstte at www.usps con4
r -i
C=ertified Fee > j
M Postmark
Q Return fieceipt Fee Ram
Q (Ertdorwrnout Required)
Q Resirieted Deiivery Fee t
Ca (Endorsement Required)
[ti
U -)Total Postage & Fees s
r-=1
SERI To
ri
Street, Apt. No.;
Q or PO Box No. _4
rte- Ct..,fy, 4►�ra_��.. Av .- N -------- -------------
Stara, 2'1F+4
PS Form
:rr August 2006 See Reverse for Instructions
Er
Q Postage
..R
r I Certified Fee
M Postmark
© Return Receipt Fee Hem
© (Endorsement Required)
M Restricted Delivery Fee
(Endorsement Required)
Q
Total Postage & Fees $
r-1
Sent To rr
r� - ------- -------------` .Ilhm �,.. �"_ f ................... _.._--------- .......
� S`treef, Apt Na; J
Q or PO Box No. SLOB �vt rl
rti----------------------- `}�.� .� ----- -L-- s-----._-.---------------
C,ry, scare, zrP+a
Rt.,E�� W g6n5�
PS Form
:r. August 2006 See Reverse for Instructions
futamesrc Mail c
For delivery Inform
IT'
M
_n Postage $
r�
Certified Fee
rrt Postmark
Q Return Receipt Fee H
Q (Endorsement Required)
Q we
Restricted Delivery Fee
(Endorsement Required)
Q
It
LnTotal Postage & Fees
Sent To
q.........................._._._.............................
Street, Apt. No.; e n ss==
© or PO Hox No. - -- Yater `---!tom -1=_r---------•-----------------
Cily, State, zrP+a DD
f4 $Did.
PS Form :rr August 2006 See Reverse for Instructions
(E)onf abd Udl Only; No Insurance Coverage Provided]
For detivtiry kdormation visit our webslts at tkww.usps.colne
M Postmark
Q Return Re.reipl Fee Here
© (Endcrsement Required)
M Restricted Delivery Fee
(Endorsement Required)
Q
In
Total Postage & Fees
r -a
Sent 10
------------------------ot,Apt No.
Street, Apf. No.;
Q or FO Box No. `
r'
c, --------- - -••------- .........................
ry, scare,-zrF+a
PS Form
:rr August 2006 See Reverse for Ins1ructions
CERTIFIEDU.S. Postal Service,.
MAIL,, RECEIPT
M (Domesticail Only; No Insurance Coverage Provided)
Q ,
17-
Q
—0 Postage $
r-1
Certified Fee
M
M Return Raceipt Fee Postmark
Q (Endorsement Required) Here
Q Restricted Delivery Fee
(Endorsement Required)
Q
ft
u7 Total Postage & Fees
r�
enc To
Sireef,Apf.7yo; .._..___�,..t[�Atl..!�.��' �.._......---
or PO Box No.
crfy, Stare, zrP+ a ....
�t+1�•N to qeU&(
:rr rr, -
U.S.
Postal
Servicer.
CERTIFIED
MAILW
RECEIPT
' (Domestic
Mail
Only,
No Insurance
Coverage
Provided)
For delivery
information
visit our
�
-■■fin
website
at www.usps.comx
Er
C3
—a Postage
r -q
Certitled Fee
fel
Q Retum Receipt Fee Postmark
Q (Endorsement Required) Here
1--3 Restricted Delivery Fee
ED (Endorsement Required)
l7�-
Ln Tatar Postage &t=ees
r�
San, To
Street, Apt. hJo.; •••-----._
!�
Q ,x
efi, stare, rrP+R ------ -------------------------
or PO BOX No,---•-
A
:rr rt.
■ -
RECEIPT
CERTIFIED
D s,+
cF-
tD
-B Postage
,R
( ert#ied fee Postmark
mHere
Return Receipt Fee
(Endorsement Requned?
C-3 Restricted D©livery Fee
ED (Endorsement Required)
t j Tota4 Postage & Fees
LTo---------_...;. �( t� / vi•_ E--••--------
'J1�Yrte...._--..._-
r`--
P+4 "
Postal
RECEIPTCERTIFIED MAIL.
Ln D.
Q
IS"
Postage 5
r
Certified Fee
!'Ft Postmark
E-3 ReturnReCelpt Fee Here
C3 (Endorsement Required)
C3 Restricted Delivery Fee
(Endorsement Required)
Total Postage & Fees
trf
ra
sent To
................1s.. ......._ '
;
Street. Rpt. No.
©
or PO Box No. $ j � bl .'1.. � � � r5--- ------------
eiry Staffs; ziP+4 �i
t�t�.�r1 W R i1g45�
U.S. Postal Service'r-
■ , w ■
womestic man onty, No Insurance Coverage Provided)
Postage
a
Certified Fee
Postmark
Retum Receipt Fee Here
(Endorsement Required)
Restrictod Delivery Fee
(Endorsement Regwred)
CJ
Ln Total Postage & Fees
r�
L TO
•---------------------------
� 5 i r 4i1=E------------------------------
4 } 5�
(Domestic Mai! C
r■
For deiivery intortn+
w
C3
—p Postage $
r=1
Certified Fee
M Postmark
O Return Receipt Fee Here
M (Endorsement Required)
M Restricted Delivery Fee
(Endorsement Required)
LnTotal Postage & Fees
>a
Ser:t To
�ey1I i IrM S p 1r�
� SYreef, ......
p_f No.;
or PO Box No.
---ty,------------- --------------------------
csrars,ZrR+4 C`Q-w}tn Wh �ggSl
PS Form :,, August 2006 See Reverse for Instructions
postal
CERTIFIEP MAIL-
■
.
/e _ mail only, No If.muffin
ce-Goverege Provided)
co
C]
-
- _.._j
lC3
A--
Pcatage
----
Certified Fee
Postmark
Postage
Return Receipt Fen
(Endorsement Required) ,
Here
r-3
Certhled Fee
©
Restricted Delivery Fee
M
(Endorsement Required)
ti
Postmark
©
r�
U-1
Total Postage & Fees
Here
0
(Endorsement Required)
a•-----'-A��'--__.F,.t__.ti15-41�-----------------.-----------
SentTO p l 1
--
M
--
Streer, Apt. o.;
or PP Box No. o
5 1 1�_�r-_e
v 4 t ..................
City Suis,"ZiA+4 "
(Endorsement Required)
(Domestic Mai! C
r■
For deiivery intortn+
w
C3
—p Postage $
r=1
Certified Fee
M Postmark
O Return Receipt Fee Here
M (Endorsement Required)
M Restricted Delivery Fee
(Endorsement Required)
LnTotal Postage & Fees
>a
Ser:t To
�ey1I i IrM S p 1r�
� SYreef, ......
p_f No.;
or PO Box No.
---ty,------------- --------------------------
csrars,ZrR+4 C`Q-w}tn Wh �ggSl
PS Form :,, August 2006 See Reverse for Instructions
Postal
CERTIFIED r
RECEIPT
pamestk Mail Only, No Insurance
Coverage Provided)
co
C]
-
Postage
$
r-3
Certhled Fee
M
Postmark
©
Return Receipt Fee
Here
0
(Endorsement Required)
Q
Restricted Delivery Fee
(Endorsement Required)
O
r-
tn
Total Postage &F88"
V-3
r�
Sent Ta ,
Street, Apt. No.;
�
or PO BOX No. $ 55 i1. n ro l.-
five AIz ..
— ..........................
__...
tZ���•. VN
PS Form :,, August 2006
�MiL
See Reverse for Instructions
(Domestic Mai! C
r■
For deiivery intortn+
w
C3
—p Postage $
r=1
Certified Fee
M Postmark
O Return Receipt Fee Here
M (Endorsement Required)
M Restricted Delivery Fee
(Endorsement Required)
LnTotal Postage & Fees
>a
Ser:t To
�ey1I i IrM S p 1r�
� SYreef, ......
p_f No.;
or PO Box No.
---ty,------------- --------------------------
csrars,ZrR+4 C`Q-w}tn Wh �ggSl
PS Form :,, August 2006 See Reverse for Instructions
(LjWneSW Mar+ urrry; rw rrrsarerrcm
r
For dell" information visit our 10bal!
,
M Postmark
Q Return Receipt Fee Here
r-1 (Endorsement Required)
M Restricted Delivery Fee
(Endorsement Required)
C7
C`- Total Postage & Fees
r -R
Sent To
ab " L� 4s.. ................. ----------------------
Strest,
or PO box No.
Crry, State, Z1P+4
PS Form
R<,�ic,., Wl1 AgCS�
rr August 2006 See Reverse for Instructilo
gig (uornesa mart c
31 For delivery inform+
© Postage
..D
r -R
Certified Fee
M
Postmark
M Return Receipt Fea
1--3(EndorsementRequired)
M
0
Return Receipt Fee
(Endorsement Required)
Hera
Restricted Delivery Fee
Postmark
Here
ED
©
(Endorsement Required)
co
Restricted Delivery Fee
l�
u7 Total Postage & Fees
{Endorsement Required)
(Endorsement Required)
ra
fes -
Sent Tor
Lf')
r -q
-q
-Q�+�+t 1�
--------------------------- ----
8 ! ``
4 SSC, ��__ -J.xu k_rl..----------------
--�
r'�
Srreet, Apt. No.;
Soar TO
Total Postage & Fees
c n
or PO Box No. ) I N(
W"'
--
5 ------------
----•-.......................�A......................................
Crty, Siafe, ZfP+d
------------------------------
0, PL]SoxNo.---- ---- ----- -
rr,,1�! 0 !1
-[X&-_¢t�--r-�t-----------------------
City, Stare, ZIP+4
PS Form :r, ,r.
See_Reverse for Instructions
(Domestic Mall G
For dellvery informi
rn
M
0
Return Receipt Fee
(Endorsement Required)
Return Receipt Fee
Postmark
Here
ED
©
(Endorsement Required)
Restricted Delivery Fee
Restricted Delivery Fee
C:j
{Endorsement Required)
(Endorsement Required)
fes -
Lf')
r -q
Total Postage & Fees
Soar TO
Total Postage & Fees
a
Street, Apt
--
5 ------------
r--1
------------------------------
0, PL]SoxNo.---- ---- ----- -
rr,,1�! 0 !1
-[X&-_¢t�--r-�t-----------------------
City, Stare, ZIP+4
---------"
Sent To
PIS Form :ri August 2006
U A '�B OSL
See Reverse for Instructions
(DorneWlc 141811 Only; Nc
For dekvgry Information vis
Postage
I1
Certified Fee 1
IM PDSltnark
M Roum Receipt Fee
M {Endorsement Required) Here
I-0 Restricted Delivery Fee
Q (Endorsement Required}
tLn Total Postage & Fees
r -i
Sent To
IZZI Street, Apt. Na.;
or PC Box No. ti�__ i►_a�_4S___.[7_� S ....._ _ __
Cit}; State,ZfP+4 rr�� ` ry aM••��•-�•- �•
ILi�1 i ,-N W ,1 �L
PS Form :rt August 2006 See Reverse for Instructions
(Domestic Mail Only; No insurance Cc
For delivery nnation visit our website al
Er
O
,--p Postage
r�
Certified Fee
M Postmark
M Retum Receipt Fee
M (Endorsement Required) Hero
C3 Restricted Delivery Fee
(Endorsement Required)
Ln j Total Postage & Faes
r-3
Sent To
r3 p�i 4
r� -••---------------------x�-
CO srreer, Apr. Na.;
FZ or PC Sax NO. �(,� _l"1:,�4 .............------'-'•-•'""
...........
Cit}; State, 71P+4
Z2'41>%'IwR 48051
PS Form :r, August 2006 See Reverse for Instructions.
■ (Domestic Mail Only; NC
For delivery information vis
Postage 5
Certified Fee
M
Postmark
©
Return Receipt Fee
Here
©
(Endorsement Required)
fl
Restricted Delivery Fee
(Endorsement Required)
�
Total Postage & Fees
$
r--1
Sent To
r -R
r`-
Srreof, Apt. No.;
or PC Box No. r
?55g..4iM;._�i:t rs�
--------------------
Gny, State, ZIP+4
PS Form :rr August 2006 See
Reverse for instructions
tT
V
—R
P.3siaga
$
Postmark
RReceipt Fee
M
Certified Fee
Here
EZI
Holum =.
Postrrark
Q
(Endars[=mrnt RegUlr2d) tl}
e
Here
CO
tin
Rastnc-ad Delivery Fee
r7
(Endorsement Required}
r
Sent To
r --i
r-1
1,n
Total Postage & Fees
A--p--t.
St�eei. No,;
PO Box No,
b -------------••--•-••-----•----
-,-_-----
g j t 0A,,, � Av,, N (
City; Sraia, z1P+4--------------
-----------------------•.,-
re,
Sent To I (
-- 7rt. A±1!�__
11
%!tn&Ams----------------
Street,Ap"t No----- _ell
tL
nr�OBoxNo. 31� fUE RV, (
C�ty. Stats, ZfP+4 _p--- --------------------
R.{� y p
i V%VsN WA1 jL
:1, August 2006
-------
-. (Domestic Mail Only; Nc
For delivery Information vie
Postage 9
ri
Certltled Fee
t3 ReturnReceipt Fee Postmark
© tEndorsement Required) Here
© Restricted Delivery Fee
(Endorsement Required)
O
LLfl Total Postage & Rees s
rq
Sent To
t,,,
..........................t1:tAn---_C._l0_L4'_r^_Mrd.i..._.._.._...............-----•---
Slreet,Apt. No.;
or PO Sox No. 3 froi Yi.. N ........._
Crty, Slate, zlP+¢ q
PS Form :0, August 2006 . See Reverse for lnslructiorf7�
■ (oomesrrc marl unry; no rrrsuri
r For delivery information visit our w
tr
.J]
Postage
r^�
Certified Fee
M Postmark
M Return Recoipt Fee Here
t:3 (Endorsement Required)
O Restricted Delivery Fee
(Endorsement Required)
1-171Total Postage & Fees
re,
Sent To
.............. �+�--_ �stan._ ��------------------ -------
S°freet, Apt. No,;
or PO Box No.
Iti S
Cra_.....--ta•-te, -z---lP+--- ----- a ...... .............
VA
y, 4
PS Form
:,, August 2006 See Reverse for Instructions
U.S. Postal, Service,,
CERTIFIED MAIL,. RECEIPT
(Dom"ft Mair only; No insurance Coverage Provided]
Far dalivery lnfornwMan Visit our wabslte at www.usps cor ft
w
M
El Return Hece;pt Fee Postmark
M (Frldor ementRequiredj Here
Reslricled Delivery Fee
(Endarsement Required)
Lr'I Total Postage & Fees
r-:4
ESt4
w 1
.;. _______�00__....._+4
PS Form
:r, August 2006 See Reverse for Instructions
(Lamesrlc Marr Only; No Insurance Coverage Pre
BE 1
For delivery information visit our website at www.uspe.r
Cr
—0 Postage $
Certified Feb
M P061matk
M Return Receipt Fee
© (Endorsement Required) Here
Restricted Delivery Fee
(Endorsement Required)
LnTotal Postage & Fees
rl
Sent Ta
rl 1 4--------------- L p
r -i ---�_? - h��-T��............................
Street„opt No-;
17� or PO Box No. -511---
----------------• ----._.._..._.........----------'--
Crry, stare, zrP+a
PS Form
:,, August 2006 S!ae Reverse for Instructions
IU.S. Postal Service,,,
CERTIFIED MAIL,. RECEIPT
F. (Domestic Mail Only; No Insurance Coverage Provided)
1 For delivery information visit our website at www.uaps.eomjp
�R
1
Postage, $
r -R
Certified Fee
17171
Postmark
RReceipt Fee
M
(Endorsement
sement Required)
Here
ED
Restdctod Delivery Fee
M
(Endorsement Required)
tin
Tota[ Postage &Fees
r1
Sent To
r --i
r-1
----------•-----------
Nor
A--p--t.
St�eei. No,;
PO Box No,
b -------------••--•-••-----•----
-,-_-----
g j t 0A,,, � Av,, N (
City; Sraia, z1P+4--------------
-----------------------•.,-
3800L August 2006
Rth�.,, WR A�o;i
See Reverse for Instructions
(LAonterst% �alr c
fir
—
_U post„g, `c
C,-rt1flPu Foe
M
0Pcstmzrk
Q Return Receipt Fee Here
(Endorsement Required)
Rostrictcd Delivery Fee
(Endorsement Required)
lti
Ln Total Postage & Fees
r -
Sent To
`.n,.__:i_.��,i__k,,°�-----------------
© Street, Apt No.; J
or PO Box No.
--------------------------------•---•-•------------------
Crty, Staty. XrP+4
Kv,, o, WA At$951L
PS Form :rl AUgUSI 2006 See Reverse lor Instructlom
M.
a -
O
-11 Postage $
r -R
Certified Fee
M
p Return Receipt Fee Postmark
M (Endorsement Required) Rem
C3 Restrtcted Delivery Fee
[71(Endorsement Required)
tLrt Total Postage & Fees
r-4
Sent To
C-4 iG w.a %1, En}ii4tt
---•-- -•--- �
.; x.__4_...1.. --• -.............
© Sfraet Apt. Noo [
or PO Box No, 0 5 7 b i w A w[ �+r
---------------^- ...------..............---
cry, state, r�P+4 -
PJ-) W 1 `�gb5t
PS Form :11 August 2006
■ (Domestic Mail Only, No Insurance Coverage Prc
For delivery Irtformalion visit our webstte at www.usps.l
[]' �.
,a Postage s
Certified Fee
M Postmark
ED Return Receipt Fee Here
(Endorsement Required)
1--3 Restricted Delivery Fee
M (Endorsement Required)
rN-
U-1 Total Postage & Fees
r•i
Sent To ry
r-4; ,k"&q 1. Ap v:r
r -i ------------------------�r--------------------y_...:...._...........
M treat, Apf. No.
or PO Box No.
17�-Cr-- .._.. .... 4_ n i7 :�— .. ............
ay, State, 7rP+4
�, -' W go 5i
PS Form :11 August 2006
rel
ta-t
c�
� Postage
rq
Certified Fee
rrl Postmark
Flotium Receipt FeeHere
�
(Endorsement RaGuirLd) red)
Rnslr;r_Ned Do !Ivory Fen
(Endorsernent Required)
C2
LnTotal Postage & Fees
1�
Sent To
� Suver, Rpt. No.;
or PO Sox No.vt�,
r% -------------------------------------------- - — ^--------------•-•---
City, State, IIP+4
Cta~1��h w 607
PS Form
:1, Augusl 2006
(Domestic Mail Only; No Insurance Coverage Provided)
For delivery Informatlon visit our website at www.usps.00mo
M
GEHTIFIED
MAILTM
RECEIPT
(Domestic
Mail Only;
No Insurance
Coverage
Provided)
Restricted Delivery Fee
For delivery
information
visit our
website at
www.usps,cotn.f,•
fL
Irl
a -
O
-11 Postage $
r -R
Certified Fee
M
p Return Receipt Fee Postmark
M (Endorsement Required) Rem
C3 Restrtcted Delivery Fee
[71(Endorsement Required)
tLrt Total Postage & Fees
r-4
Sent To
C-4 iG w.a %1, En}ii4tt
---•-- -•--- �
.; x.__4_...1.. --• -.............
© Sfraet Apt. Noo [
or PO Box No, 0 5 7 b i w A w[ �+r
---------------^- ...------..............---
cry, state, r�P+4 -
PJ-) W 1 `�gb5t
PS Form :11 August 2006
■ (Domestic Mail Only, No Insurance Coverage Prc
For delivery Irtformalion visit our webstte at www.usps.l
[]' �.
,a Postage s
Certified Fee
M Postmark
ED Return Receipt Fee Here
(Endorsement Required)
1--3 Restricted Delivery Fee
M (Endorsement Required)
rN-
U-1 Total Postage & Fees
r•i
Sent To ry
r-4; ,k"&q 1. Ap v:r
r -i ------------------------�r--------------------y_...:...._...........
M treat, Apf. No.
or PO Box No.
17�-Cr-- .._.. .... 4_ n i7 :�— .. ............
ay, State, 7rP+4
�, -' W go 5i
PS Form :11 August 2006
rel
ta-t
c�
� Postage
rq
Certified Fee
rrl Postmark
Flotium Receipt FeeHere
�
(Endorsement RaGuirLd) red)
Rnslr;r_Ned Do !Ivory Fen
(Endorsernent Required)
C2
LnTotal Postage & Fees
1�
Sent To
� Suver, Rpt. No.;
or PO Sox No.vt�,
r% -------------------------------------------- - — ^--------------•-•---
City, State, IIP+4
Cta~1��h w 607
PS Form
:1, Augusl 2006
(Domestic Mail Only; No Insurance Coverage Provided)
For delivery Informatlon visit our website at www.usps.00mo
M
M
C3
Return Receipt Fee
Poltmark
Here
(Endorsement Required)
Restricted Delivery Fee
(Endorsement Required)
fL
Irl
Total Postage & Fees
r -i
ent To
------------
�1�t�°�-----------------
[]
rN-
--------k�v
Street, Apt. No.;
or PO Box No.?�
-_-------
Q�
�:.__.
city, state, 7rP+4-- -- i
}.�
PS Form :11 August 2006
_ _._., ---
- -•-----••- ----------
WN ago
Postal
CERTIFIED RECEIPT
fTi
s . Only,
.
LnProvided)
[ti
Postage 5
r•R
Certified Fee
frl Postmark
C3 Return Receipt Pea
Q (Endorsement Required) Here
E:l Res;zncted Delivery Fee
d (Endorsement Required)
f-
yr7 Total Postage &Fees
r^1
Sent To
'qi3 k: ti4M
� SEreef, Apt. No.;
or PO Box No.
city, StateS
r' -------.. —I .----
Ert, Z1P+4 '---•---..•••---•----
PS Form :rr August 2006 See Reverse for Instructions
(DOltrestic 1l fN Only, No
+ For delivery Iftrmation via
Er
0
.l3Postage�T���
Certified Fee i
M �— Postmark
R©lum Receipt Pee Here
� (Endorsement Required)
Restricted Delivery Fon
(Endorsement Required)
O
� Total Postage & Fees
r -q
Sent To
Sweet, Apt. No.;
© or PO Box No, VS}
--..- --- _.__r
Cih; Stara. Z7P+A------------
PS Form
:I4 August 2006 See Reverse for Instructions
(Domestic Mail Only, IVo Insuran
For delivery information visit our we;
F.
Gertitied Fee
Fit
L3 Return
Return Receipt Fee Here
M (Endorsement Required)
O
Restricted Delivery Fee
© (Endorsement Required)
rt
W Total Postage & Fees
tq
Sent To
E3------- --- 1-
Srrvat, Apt. No.; 6
or PO Box No. 601ANJ
Grry, State, ,Z7P+4 Q� 0 �
R eh�u W h
PS Form :11 August 2006
H Postage $
ra
Certilied Fee
rn
Return Receipt Fee Postmark
C3 (Endorsement Required) Here
O
Restricted Delivery Fee
p (Endorsement Required)
r`-
ur) Total Postage & Fees
r -q
Sent ApBOXr To
Q S
r3 _frmet; No"; --------•-----
city, Stare. ZIP+a -------------------- ....
WN qb j`
PS Form :11 August 2006
tic NMI OW No Insurance CaVverege Provides
r r dsYtsatp Wwmatlon visit out website at wwmusps.Goms
Cenifed Fee I
rrl Postmark
Q Relum Receipt Fee
E::l (Endorsement Required) Here
EZI Restneted Delivery Fee
g m
{Endorseent Required)
f
L<l Total Postage & Fees
r�
Sent To
Sweet, Apf. Na.;
Q Or PO Box No.
•t {r Nt
Glry, State, ZlP+4 y ---_ -------------------------------
PS Form 3800
--._^..................-------
:11 August 2006
U.S.
Postal
Servicer.
CERTIFIED
MAIL,
RECEIPT
CERTIFIED
1
(Domestic
MAIL,,,
RECEIPT
No Insurance
Coverage
r
(Domestic
Mail
Only,
No Insurance
Coverage
Provided)
For delivery
website at
www.usps.coni
rf
information
visit our
website at
www.uspa.Com®
H Postage $
ra
Certilied Fee
rn
Return Receipt Fee Postmark
C3 (Endorsement Required) Here
O
Restricted Delivery Fee
p (Endorsement Required)
r`-
ur) Total Postage & Fees
r -q
Sent ApBOXr To
Q S
r3 _frmet; No"; --------•-----
city, Stare. ZIP+a -------------------- ....
WN qb j`
PS Form :11 August 2006
tic NMI OW No Insurance CaVverege Provides
r r dsYtsatp Wwmatlon visit out website at wwmusps.Goms
Cenifed Fee I
rrl Postmark
Q Relum Receipt Fee
E::l (Endorsement Required) Here
EZI Restneted Delivery Fee
g m
{Endorseent Required)
f
L<l Total Postage & Fees
r�
Sent To
Sweet, Apf. Na.;
Q Or PO Box No.
•t {r Nt
Glry, State, ZlP+4 y ---_ -------------------------------
PS Form 3800
--._^..................-------
:11 August 2006
IS'
-D Postage
r
Certified Fee
Rl
$
© Reium Receipt Fee Postmark
M (Endorsement Required) Here
En Restricted Delivery Fee
(Endorsement Required)
C7
Ln Total Postage & Fees
1-q
Sant o
'a /1tW E
....................
1-q Street. Apt Na.:--�------------------------•-
C:3 or PO Box No. B i Z 1 �. r r J,}
............. s►z .._A_e _....---------..._
City; State, 7fP+4 -------•-••------
:11 11.
1 (Domestic Mail G
+ For delivery inform.
Q'
..D
postage
r -q
Certified Fee
frl Postmark
© Return Receipt Fee Here
© (Endorsement Required)
M Restricted delivery Fee
(Endorsement Required)
E3
I'-
L17 Total Postage & Fees
r -q
Sent To
C _,
r1 - --- ---- ' t - .y.............i.
Street, Apt Na.;CJ
Or PP Box No.3-----------------
Grty, State, ZfP+4 ----^---•--•--•--•
R-e•.�er,l � R yKbsl
PS Form
:11 August 2006
U.S.
Postal
Servicer.
CERTIFIED
MAIL,
RECEIPT
1
(Domestic
Mail
Only;
No Insurance
Coverage
Provided)
For delivery
information
visit our
website at
www.usps.coni
rf
,
IS'
-D Postage
r
Certified Fee
Rl
$
© Reium Receipt Fee Postmark
M (Endorsement Required) Here
En Restricted Delivery Fee
(Endorsement Required)
C7
Ln Total Postage & Fees
1-q
Sant o
'a /1tW E
....................
1-q Street. Apt Na.:--�------------------------•-
C:3 or PO Box No. B i Z 1 �. r r J,}
............. s►z .._A_e _....---------..._
City; State, 7fP+4 -------•-••------
:11 11.
1 (Domestic Mail G
+ For delivery inform.
Q'
..D
postage
r -q
Certified Fee
frl Postmark
© Return Receipt Fee Here
© (Endorsement Required)
M Restricted delivery Fee
(Endorsement Required)
E3
I'-
L17 Total Postage & Fees
r -q
Sent To
C _,
r1 - --- ---- ' t - .y.............i.
Street, Apt Na.;CJ
Or PP Box No.3-----------------
Grty, State, ZfP+4 ----^---•--•--•--•
R-e•.�er,l � R yKbsl
PS Form
:11 August 2006
F+ "(vornesUc Merl Only; lilc
�raa
• Fd9Edel" Information vi®
i
..D Pastage j �+
r -i
Certitied Fee {
M — - Postmark
M Rolum Receipt Fee Hare
{EndD"rinert Required)
C3 Restricted Delivary ree
(Endarsement Roquired)
C.7
Lrl Total Postage & Fees
r�
Sent To
r-9
r -q --------"..._...-.__."•-"-Art- _Th____ --- se-
......... ........................
Street Apt- No.;
or PO Box Na
Crfy, state, Z1P+4
113
PS Form :,, August 2011316 See Reverse for Instructions
Lr'lFor delivery information visit our weldsite at wwwmaps.comlo
IT _.
Postage
Certified Fee
ED Return Receipt Fee
© (Endorsement Required)
0 Restricted Delivery Fee
(Endorsement Required)
;ravrrmow
marr;vnfy, era rnWil-ar se Leuvarage r iriuci
F
For
.delivery information visit our webette at www.u".camo j
i
--------------------------
F
i
F
Ft- Pip.;
------ --------------
r�
Or PO
or PO Box Nn.
----------$1(..intnwlt...K.Yt
....
N.�............................
Crry, State, zlP+4
•------------------------------------N�
----------------------
PS Form :,0 August
© Rn""Recqui
eipt "no
P rh
O Here
(Endorsement Rered)
Restricted Delivery Fee
(Fndorsernr i Required)
M
li Total Postage & Fees
LnF$r-q
(Domestic Mail Only, Ne
F For [ielivery information vi4
cr
C3
Postage
r�
CertMed Fee
Postmark tri Postmark
Pletum Fee
Hero (Endorsement ReReceiptquired)Here
Restricted Delivery Fee
(Endorsement Required)
O
r- Total Postage & Fees
Ln
a
�Seri
JJ
---------------------
-- - i C-- '--- f------- Y----------------------------------------
r� Street, Apf. Na.;
Ci or PO Bax No. a a {fir s1" S -------------------------------
PS
-------------- - - -
h o -.._.......- .
c,ry srate, zrP+4
:rr August 2006 See Reverse for InStructi
(DORMsrJO Mall L
Mdor delivery Inform
M
[r
Postage $
Certified Fee
Q Postmark Return Receipt Fee H
re
(Endorsement Required)
Restricted Delivery Fee
(Endorsement Required)
M
Ii
U'11Total Postage & Fees
a
Seri tt ( b,
a "�n-l_ C-A�i_6_-1uA ----------------------------
Street, Apr. No.; 11
or PO Box No. ......................
CRy, Sfafe, ZfP+4
io gkaSli.
PS Form :,r August 2006 See Reverse for instructions
O
U -t Total Postage & Fees $
r•i
Sent To -
rl
Srraef, Apt. No.;------------------
C:3 or PO Box No. li
117, Crty, snare, zrP+a--------------------------------
PS
- -------------•---------•---
1�h A$o>ti
:.r August 2006 See Reverse for Instructions
if (Domestic Mail 0
tr
t] -
co
f�
- C Postage
M Certified Fee
p
Ratum Postmark
Receipt Fee Oars
O (Endorsement Required)
L3
Restricted Delivery Fee
© (Endarsement Required)
i
Ln Total Postage & Fees
r--1 I ==
Soni To
'-----•-F..._._.`
-A
II
--------------------------
[�
Ft- Pip.;
------ --------------
r�
Or PO
or PO Box Nn.
----------$1(..intnwlt...K.Yt
....
N.�............................
Crry, State, zlP+4
•------------------------------------N�
----------------------
PS Form :,0 August
PS Form :,r August
2006
See Reverse lor Instructions
(Domestic Mail Only, Ne
F For [ielivery information vi4
cr
C3
Postage
r�
CertMed Fee
Postmark tri Postmark
Pletum Fee
Hero (Endorsement ReReceiptquired)Here
Restricted Delivery Fee
(Endorsement Required)
O
r- Total Postage & Fees
Ln
a
�Seri
JJ
---------------------
-- - i C-- '--- f------- Y----------------------------------------
r� Street, Apf. Na.;
Ci or PO Bax No. a a {fir s1" S -------------------------------
PS
-------------- - - -
h o -.._.......- .
c,ry srate, zrP+4
:rr August 2006 See Reverse for InStructi
(DORMsrJO Mall L
Mdor delivery Inform
M
[r
Postage $
Certified Fee
Q Postmark Return Receipt Fee H
re
(Endorsement Required)
Restricted Delivery Fee
(Endorsement Required)
M
Ii
U'11Total Postage & Fees
a
Seri tt ( b,
a "�n-l_ C-A�i_6_-1uA ----------------------------
Street, Apr. No.; 11
or PO Box No. ......................
CRy, Sfafe, ZfP+4
io gkaSli.
PS Form :,r August 2006 See Reverse for instructions
O
U -t Total Postage & Fees $
r•i
Sent To -
rl
Srraef, Apt. No.;------------------
C:3 or PO Box No. li
117, Crty, snare, zrP+a--------------------------------
PS
- -------------•---------•---
1�h A$o>ti
:.r August 2006 See Reverse for Instructions
if (Domestic Mail 0
tr
t] -
co
f�
- C Postage
M Certified Fee
p
Ratum Postmark
Receipt Fee Oars
O (Endorsement Required)
L3
Restricted Delivery Fee
© (Endarsement Required)
i
Ln Total Postage & Fees
r--1 I ==
-gent To
4
l• A?w -
[�
Stre9f,:Opt.No.,"-----3�hq----
------ --------------
(ti.
or PO Box No---------
Crfy, State, IfP+4
•------------------------------------N�
----------------------
PS Form :,0 August
2006
See Reverse for Instructions
Postal
CERTIFIED
MAIL. RECEIPT
�
iu +
IF
__.--.......-
CD
...0 Yr1FPage o-0
veriilic:t. Fee
ITE "ostrnark
© Retum Receipt Fee Here
© (Endorsement Required)
ID Restricted Delivery i
M ;EndursementRequired)
r -r) fatal Postage &Fees
rR _
Sent To
----
© 5rreot, Apt. No-.; t,
or PO Box No. Q {�-} 4r•�l ttrl i1! t
--- --------------------------------
City, Stale, ZIP+4 U N a $ 4 ��
PS Form ir, August 2006 See Reverse for Instructions
(Domestk Mail C
. retar�
For delhrery inform;
CO
C3
_n Postage I $
r-=1
e (Domestic Mail C
�� For delivery inform
Cc
-p Postage $
r�
frl Certified Fee
P
C ostttlgrk
0 Return Receipt Fee HBte
(Endorsement Required)
E3
Restricted Delivery Fee
O (Endorsement Required)
17-
ri'i Total Postage & Fees $
r-9 Sent To
___-------- _-----
______tti�
M Street, Apt. No.;
r� or PO Box No
crly scare, irP+a
PS Form 31 August 2006 See Reverse for Instructions :1
M KI,� ii:+pn 4,',w i![�IrJI }Qs'(+lfiF
� PUstage I �
nq
Certified Fee I
ITl — - Postmark
ED Return Receipt Fee Here
© (Endorsement Fiequiredi
Rostricted Delivery Fee
(Endorsement Required)
L7
Ln Total Postage & Fees $
tr7
r�
Sent To y
S!rea1, Api. No.;
or PO Box No. �U hrlwQ:r� �t �Ic
1 w----------------- ----.-_------------------_..__...-_-.-
Crty, State, TIP+4
RL k- "% -- A � w tiii
PS Form :r, August 2006 See Reverse for instructions
(Domestic Mail Only; No lnsuren
Fpr delivery iMormstion visit our wst
Certified Fee
M Postmark
C3 Return Receipt Fee Here
� (Endorsement Required)
Restricted Delivery Fee
C:3 (Endorsement Required)
f` -
Li Total Postage & Fees $
r�
Sent To
p �trreaf, Apt Na.;
rti or PO Box No.
-------------
Cay, State, ZiP+4 pp f r d y
[SCM �U7 W f5 l5� r��
PS Form
:rr August 2006 See Reverse for Instrucliarj
(Domestic Mair G
ri
For delivery inlormi
Postage $
ri
M
Certified Fee
Ej
Return Receipt Fee Postmark
© (Endorsement Required) Here
ID
Restricted Delivery Fee
© (Endorsement Required)
171-
iTotal Postage & Fees $
r-91 Sent To t r
p Street, Apt. No.;
[� orPOBox
---
City, State, ZIP+4
-----------------
PS Form 3800. August
Rehr+�. W A x$051,
r,. See Reverse for Instruci
Certified Fee
M
C7
Postmark
Return Receipt Fee
Here
O
(Endorsement Required)
iM
Restricted Delivery Fee
C3
(Endorsement Required)
t7 -
i
Total Postage &i
$
r -q
r q
Sent To ll
rl
4WrinCL
•S1li:'�--------------- ----------------
or PO Sox No. pf, p'lrtt
n C �j
.......... _-------------------
__________________________________________________��r_
Cl!y; State. ZIP+4
�tai4� LJA
PS Form :rr August 2006
�Sb56
See Reverse lot Instructiorm
e (Domestic Mail C
�� For delivery inform
Cc
-p Postage $
r�
frl Certified Fee
P
C ostttlgrk
0 Return Receipt Fee HBte
(Endorsement Required)
E3
Restricted Delivery Fee
O (Endorsement Required)
17-
ri'i Total Postage & Fees $
r-9 Sent To
___-------- _-----
______tti�
M Street, Apt. No.;
r� or PO Box No
crly scare, irP+a
PS Form 31 August 2006 See Reverse for Instructions :1
M KI,� ii:+pn 4,',w i![�IrJI }Qs'(+lfiF
� PUstage I �
nq
Certified Fee I
ITl — - Postmark
ED Return Receipt Fee Here
© (Endorsement Fiequiredi
Rostricted Delivery Fee
(Endorsement Required)
L7
Ln Total Postage & Fees $
tr7
r�
Sent To y
S!rea1, Api. No.;
or PO Box No. �U hrlwQ:r� �t �Ic
1 w----------------- ----.-_------------------_..__...-_-.-
Crty, State, TIP+4
RL k- "% -- A � w tiii
PS Form :r, August 2006 See Reverse for instructions
(Domestic Mail Only; No lnsuren
Fpr delivery iMormstion visit our wst
Certified Fee
M Postmark
C3 Return Receipt Fee Here
� (Endorsement Required)
Restricted Delivery Fee
C:3 (Endorsement Required)
f` -
Li Total Postage & Fees $
r�
Sent To
p �trreaf, Apt Na.;
rti or PO Box No.
-------------
Cay, State, ZiP+4 pp f r d y
[SCM �U7 W f5 l5� r��
PS Form
:rr August 2006 See Reverse for Instrucliarj
(Domestic Mair G
ri
For delivery inlormi
Postage $
ri
M
Certified Fee
Ej
Return Receipt Fee Postmark
© (Endorsement Required) Here
ID
Restricted Delivery Fee
© (Endorsement Required)
171-
iTotal Postage & Fees $
r-91 Sent To t r
p Street, Apt. No.;
[� orPOBox
---
City, State, ZIP+4
-----------------
PS Form 3800. August
Rehr+�. W A x$051,
r,. See Reverse for Instruci
" (ptrme oft, No lnsurar
dailwety.inform mixt visitbur we
w
^;:rified Fea
rn � Postmark
n0urry Receipl Fee E Here
(Fndamorrimit Required)
Q
Restricted Delivery Fee
© (Endorsement Hequired)
Ln Total Postage & Fees
r -R
Sent To '�"'
r -i S_ IL MI � k= `� V �!5--------------
----A------ -----
© Sireor. Apf. No.; ) `1 {
or PO Box No.------- .? i --- f- '--- '\-- -`---------------------------------
City, Slate, ZIP+4
PS Form :rr August 2006 See Reverse for Instructions
(Domestic Mail Only; No Insurance Coverage Provide
I
For delivery information visit our website at www.usps.come
© Postage
..D
ri
Certified Fee
rr-I Postrnark
Q Return Receipt Fee
n (Endorsement Required) Here
Q Restricted Delivery Fee
(Endorsement Required)
17
r`-
LnTotal
r�
Postage & Fees s
Sanf rp
Frl
Retum Recelpt Fee
(Endorsement Required)
_145--------------------------
�
--------•--••- -----•--._
Street Apf. No.;
Retum Receipt Fee
Or PO Box No.
Postmark
p
--------------------------�-
Dry, State, I1P+d
PS:t0 August
--- ........................................
2006 See Reverse for Instructioto
Lthi I IFItu MAILr, RECEIPT
(Domestic Mail Only; No insurance Coverage Provided)
r For deliveryinformation visit our website at www,usps.come
`0 Postage S
r -R --
M Certified Fee
QReturn Receipt Fee P 1 ere rk
O (Endorsement Required)
Restricted Delivory Fee
p (Endorsement Required)
N
G'O Total Postage & Foes
r-4
r-9 ent Torq
p r
-------------------------
tt or PO Box �No.-
-----•------------------------
Giry, Sfafe, ZfA+4 -
PS Form
:rr August 21DO6
Ds.#al Service,•m
'IFIF�7 M�li _.. RFf`CfC
Mall Only; No Insurfmce Coverage ProvkWj
, OeAf r infar�ilon vlaR our +ifebsite M www.usps copte
r,
Q
.� Pcslaye
(Domestic Mail C
For delivery inform;
Er
Q
Postage $
r-�
Certified Fee
M Postmark
O Return Receipt Fee
O (Endorsement Required) Here
Q Restricted Delivery Fee
(Endorsement Required)
d
NTotal Postage & Fees $
r-9
Sent To
Q Street, Apt. No.; 6
or PC Box No. 0 -7) b
y
Sfafs, ztP+4 .....'1.}+Ltsat.N�-- ................
City
PS form
a-e,v}Tn IrJ py rib �L
:rr August 2006
WE (Domestic Mail Only; No insurance Coverage Provic
For delivery informetiort visit our website at www.usps.con
Er 1
Q
—p Postage $
r -R
Certified Fee
M
Ce tified coF
Postmark
Frl
Retum Recelpt Fee
(Endorsement Required)
Here
©
Retum Receipt Fee
Postmark
p
(EndorsementRequiredl.Here
Q
Reslrated Delivery Fee
Q
(Endorsement Required)
C`
u't
Total Postage $, Fees
ri
5
r�
C%
Streef, Apt, fhb.;
or PO Bear No,
t M
ra
�nf To
-----------
• — = t '
0
Stre©L Apf.
or PD Box No. i�� t I
------ ---- -
----------------
---------•-
N C t4 S�
-- ....
City, Slate, 21P+4 -------------------------------------
:rr August 2006
See Reverse for Instructiorff.
(Domestic Mail C
For delivery inform;
Er
Q
Postage $
r-�
Certified Fee
M Postmark
O Return Receipt Fee
O (Endorsement Required) Here
Q Restricted Delivery Fee
(Endorsement Required)
d
NTotal Postage & Fees $
r-9
Sent To
Q Street, Apt. No.; 6
or PC Box No. 0 -7) b
y
Sfafs, ztP+4 .....'1.}+Ltsat.N�-- ................
City
PS form
a-e,v}Tn IrJ py rib �L
:rr August 2006
WE (Domestic Mail Only; No insurance Coverage Provic
For delivery informetiort visit our website at www.usps.con
Er 1
Q
—p Postage $
r -R
Certified Fee
M
Postmark
C3
C:3
Retum Recelpt Fee
(Endorsement Required)
Here
Q
Restricted Delivery Fee
Q
(Endorsement Required)
ft
t -FJ
Total Postage 8 Fees
r-9
Sent To
ri
5
C%
Streef, Apt, fhb.;
or PO Bear No,
t M
----------------------
City, State, ZIP+4
PS Form :rr 006
See Reverse for Instructions
=■ (ilOmBt
-■ For delis
R-
-0 Postage $
r_3
Certified Fee
M Postmark
M Return Receipt Fee Here
D (Endorsement Required)
17 Rosti eted Delivery Fee
(Endorsement Required)
[w
U-11 Tote] Postage & Fees $
a
Senr To
or PO sax NO.
it---- -------------------- .... ...
c bs state, zrP+4 {n om WA `i
PS Form :,r August 2006 See Reverse for Instructions
(Domestic Maif only; No frtsurance Cc
Far deNvery information visit our website a+
Postage $
r -R
Certified Fee
rrl Postmark
Cl Return Receipt Fee Here
Q (Endorsement Required)
C3 Restricted Delivery Fee
(Endofsement Required) . .
M
Ln Total Postage S Fees
t17
r_1
SERI TO
Srreaf, Apt. No.; c�
© or PO sox No. 3 y q 'v � tl' M ,
f� '; ----------------------- Crry, State, ZIP+4
PS Form
:rr August 2006
� {ROTC MFII DIY: NC
E-1 VigdWery Inform mon vis
a
ra F
Certified Fee i
M Postma k
I= Return Receipt Fee
0 (F..ndorsement Required) ! Here
Rostricted Delivery Fee
(Endorsement Requiredj
t_q Total Postage & Fees
r -R
Sent To
_
_____ S�_�rtur_ _a#�5.9 ,�.!!!R.TM..............
Sttoet,.opt No.; c
or PO Sox No. ❑ (, 'k fi 4 ar'
[t______Sra_.r__,_ZfP+_____________________J__.._..__.__._____.__._____. __________________. __..__.
City, e4
W /t Apyb
PS Form :rr August 2006 See Reverse for Instructions
Postal ServiceW
:ITIFIFn MAILT. RECEIF
(00nmStic Mall Vnly; JVO rrrsurance [.Nusrat
-■ For delivery information visit our website at www
M Postmark
Return Receipt Fee Here
(Endorsement Required)
Restricted Delivery Fee
(Endorsement Required)
I:3
rl-
Li
�.r" 1
r -a
.. , r ,
.. _
m
[ti
�
0
_
3 i°i__. N £.-
--
Crty she e. ZIP+a
PS Form:,r August
........ ....
bfq k -
2006 See Reverse for Instructions
MAIL,. RECEIPT
..D
Postage
5
only,
No Insuraince
Coverage Provided)
(Domestic
GarlRled Fee
delivery
frl
Postmark
—
E3 Return Receipt Fee
Hese
C3
(Endorsement Requirud)
C:1 Restricted Delivery Fee
w
(Endorsement Required)
110
f
fir]
Total Postage & Fees
r -a
Sent To
[r,1sEY`'�a--------------
Stre�!. Apt. No.;
I]
or PO Box No.�t �] t'i M L
J--------------------------------------•-
17�
- ---'-----------•
criy, State, ZfP+4
Ltih},
PS Form :,, August 2006
See Reverse for Instructions
=■ (ilOmBt
-■ For delis
R-
-0 Postage $
r_3
Certified Fee
M Postmark
M Return Receipt Fee Here
D (Endorsement Required)
17 Rosti eted Delivery Fee
(Endorsement Required)
[w
U-11 Tote] Postage & Fees $
a
Senr To
or PO sax NO.
it---- -------------------- .... ...
c bs state, zrP+4 {n om WA `i
PS Form :,r August 2006 See Reverse for Instructions
(Domestic Maif only; No frtsurance Cc
Far deNvery information visit our website a+
Postage $
r -R
Certified Fee
rrl Postmark
Cl Return Receipt Fee Here
Q (Endorsement Required)
C3 Restricted Delivery Fee
(Endofsement Required) . .
M
Ln Total Postage S Fees
t17
r_1
SERI TO
Srreaf, Apt. No.; c�
© or PO sox No. 3 y q 'v � tl' M ,
f� '; ----------------------- Crry, State, ZIP+4
PS Form
:rr August 2006
� {ROTC MFII DIY: NC
E-1 VigdWery Inform mon vis
a
ra F
Certified Fee i
M Postma k
I= Return Receipt Fee
0 (F..ndorsement Required) ! Here
Rostricted Delivery Fee
(Endorsement Requiredj
t_q Total Postage & Fees
r -R
Sent To
_
_____ S�_�rtur_ _a#�5.9 ,�.!!!R.TM..............
Sttoet,.opt No.; c
or PO Sox No. ❑ (, 'k fi 4 ar'
[t______Sra_.r__,_ZfP+_____________________J__.._..__.__._____.__._____. __________________. __..__.
City, e4
W /t Apyb
PS Form :rr August 2006 See Reverse for Instructions
Postal ServiceW
:ITIFIFn MAILT. RECEIF
(00nmStic Mall Vnly; JVO rrrsurance [.Nusrat
-■ For delivery information visit our website at www
M Postmark
Return Receipt Fee Here
(Endorsement Required)
Restricted Delivery Fee
(Endorsement Required)
I:3
rl-
Li
�.r" 1
r -a
Total Postage & Fees $
Postal
ent Ta
vo.;
Street, Rpt, Na.;
�
or PO sox No.
_
3 i°i__. N £.-
--
Crty she e. ZIP+a
PS Form:,r August
........ ....
bfq k -
2006 See Reverse for Instructions
_ B Postage
r-=1
Certified Fee
MPostmark
a Return Receipt Fee Here
0 (Endorsemeni Required)
Restricted Delivery Fee
(Endorsement Required)
fL
t•rl Total Postage & Fees
rq
Sent TorA
T
M street, Apt, No.;
or PO Sax No. ----------
City, Srare, ZJF+4
:r, ,r.
U.S.
Postal
ServiceTM
CERTIFIED
MAIL,. RECEIPT
'
Mail
only,
No Insuraince
Coverage Provided)
(Domestic
delivery
intormation
visit our website
at www-uspa.coma
For
w
_ B Postage
r-=1
Certified Fee
MPostmark
a Return Receipt Fee Here
0 (Endorsemeni Required)
Restricted Delivery Fee
(Endorsement Required)
fL
t•rl Total Postage & Fees
rq
Sent TorA
T
M street, Apt, No.;
or PO Sax No. ----------
City, Srare, ZJF+4
:r, ,r.
Mi
Dc�
Ca Postage
r'3
Certified Fee
M Postmark
© Return Receipt Fee Here
(Fndorsement Required)
© Restricted Delivery Fee
(Erdorsemeni Required)
C�
Lri, Total Postage & Fees $
r:1
Sent TO
r -q A
------------•----..._.._ •--- ----------------
Street, pt. NO.;
© or PO Box No. �� h N E
-----------------•---•- t � 11_.Jz!._...-------------....
Crry, State, Zili
�'tw�an wfA `�30Sf.
PS Form
:1, August 2006
Postal
CERTIFIED + RECEIPT
[� , ! mail only; No insurance Coverage Provided)
r -i
Cr
r.Y] -
L7
D Postage $
Certified Fee
M Postmark
Return Receipt Fee Here
d (Endorsement Required)
Restricted Delivery Fee
(Erdorsement Required)
C�
u7 Total Postage & Fees $
V-1
Seat To
'ale---------------------------------------------
© Street Apt, No.;
or PO Box NO..._..-
Gity,
PS Form
:,r August 2006 See Reverse for Instructions
Er -
17 -91
Q-
-0
Postage 5
1-R
Certified Foe
M Postmark
E=I Return Receipt Fee Here
C7 (Endorsement Required)
17 Restricted Delivery Fee
(Endorsement Required)
O
17-
i
ra
CERTIFIED
MAIL. REGL
F I
-■
•(Domesft
mil ol:ly,-No
hwurance
CoverVe provided)
3�i f'UC, 10kh si�.
t`
-------------------------------
C.dy, State, ZfP+4
PS Form :,r August
----------------------------------..--•---------------
2GO6 CSee fleverse for Instructions
Pos iic
For doWli
lnfommi
visR our *ehelte
at www-trlSMOOft
M (Endorsement Required)
Restricted Delivery Fee
Ca Postage
r'3
Certified Fee
M Postmark
© Return Receipt Fee Here
(Fndorsement Required)
© Restricted Delivery Fee
(Erdorsemeni Required)
C�
Lri, Total Postage & Fees $
r:1
Sent TO
r -q A
------------•----..._.._ •--- ----------------
Street, pt. NO.;
© or PO Box No. �� h N E
-----------------•---•- t � 11_.Jz!._...-------------....
Crry, State, Zili
�'tw�an wfA `�30Sf.
PS Form
:1, August 2006
Postal
CERTIFIED + RECEIPT
[� , ! mail only; No insurance Coverage Provided)
r -i
Cr
r.Y] -
L7
D Postage $
Certified Fee
M Postmark
Return Receipt Fee Here
d (Endorsement Required)
Restricted Delivery Fee
(Erdorsement Required)
C�
u7 Total Postage & Fees $
V-1
Seat To
'ale---------------------------------------------
© Street Apt, No.;
or PO Box NO..._..-
Gity,
PS Form
:,r August 2006 See Reverse for Instructions
Er -
17 -91
Q-
-0
Postage 5
1-R
Certified Foe
M Postmark
E=I Return Receipt Fee Here
C7 (Endorsement Required)
17 Restricted Delivery Fee
(Endorsement Required)
O
17-
i
ra
Total Postage & Fees Is
Sent To
1:3 Postage
.n
$
�freet, Rpt. No.;
---..�---------------------------------------
17
Certified Fee
or PO Box No.
3�i f'UC, 10kh si�.
t`
-------------------------------
C.dy, State, ZfP+4
PS Form :,r August
----------------------------------..--•---------------
2GO6 CSee fleverse for Instructions
= Mail c
�' ..For�INfary'IMorm
A os'.age
rq
Codified -ee
ft'i
1:3 Return Receipt FPF.,
O (Endorsemert AequireC)
C3
Restricted Delvery Fee
E3 (Endxsemun'. Requiredl
Iti
Ln Total Postage & Fees
r=i
Sent To
� f Apt. Np.;
or PC Bax No. 2S ; AA .
tc
--'--
---------------------------- - Zr---i?y- --- ---------------------------------
(I State,?1P�4
V -ii ,,, U A qv .
PS Form :,, August 2006 See Reverse for Instructions
(Domestic Marl G
IIIIFor delivery inform
Ci-
Postage $
Certified Fee
ftl Postmark
p Return Receipt Fee Here
Q (Endorsement Required)
Restricted Delivery Fee
Q
(Endorsement Requited)
liTotal Postage & Fees $
ri
Sent To
r -a Ne,Etir ` SCr 1t
� Street Rpt. Na-;
or PO Bax No. VA t M, y - j C# N e
T`-----------------------------------------------
-
......_...- ........._..
City, Stals. Z1P+4
p,c,j,., V rt 4gi
PS Form :,0 August 2006 See Reverse for Instructions
M (Domestic Mail Only, Nc
• F� delivery Information vis
1:3 Postage
.n
$
17
Certified Fee
.
M
Pos iic
M Retum Receipt Fee
Here
M (Endorsement Required)
Restricted Delivery Fee
(Endorsement Required)
f�
Lr?Total Postage & Fees
$
1--1
Sant TO
{ y
Street, Apf. No.;
C7
or PO Sox NO. �7 tC5 N(- it", S)I•
(ti
--------------------------------------•--••---------------------------------------------
Crty, State, ZIP+4
?'-t.,i,,,'w N 118b51
PS Form :1, August 2006 See Reverse
for Instructions
11:0 C211X411
ru
r^•a
p
Er
M
� Postage
Cert'rtied Feu
fT't----•-�^-- -� I Postmark
M Return Receipt Fee Here
a (Endorsement Required)
© Restricted Delivery Fae
(Endorsement Requirec)
[4
U-) Total Postage & Foes
r-9
Sent To qs
_________ ..._._ ___Nk___�_�...9_�. ______-_----
Street, Apf. Nc_.;
p or PO Box No-
`^ 1°
iia«a -�Y......................
city sr�ia;-
PS Form
:ri August 2006
(Domestic. Mai! Only; No Insurance Coverage Prc
For delivery infarmstion visit our website at www.usps.:
t�
Postage $
ra
Certified Fee
M Postmark
p Retum Receipt Fee Here
C7 (Endorsement Required)
M Restricted Delivery Fee
Q (Endorsement Required)
U-)
Total Postage & Fees s
r-�
Sent To
a
------------
C]
Stroet Apt Na.; -----------
or PC Box NO. �� (t .y 51,
h- ------------------------ -----•__..._.._.._.._............._...._
City, Slate, IfP+4
-- -•------------------
PS Form
flew}4,� W A g40S4
:rr August 2006 See Reverse for Instruction=
(Domestic Maii Only; ivo insurance Ex
■
■ For delivery Information visit our website al
s
Q'
G7 Postage $
e -i
Certified Fee
M Postmark
p Return Receipt Fee Here
p (Endorsement Required)
C:3 Restricted Delivery Fee
(Endorsement Required)
O
ft Total Postage & Fees
t.r,
r�
Sent To
If
.......-
Street, Apt. Na;
C3 or PO box No.
Cly $fatg, 71P+4
PS Forr"
:0r August 2006 See Ii se for Instructions
.o
RECEIPTCERTIFIER MAILTm
MWMW* HBO Only, No Im
r^9
p
F-
M
M R6h,rn Receipt Fee Pgstma S
ED (Eroorse'nent Required) Here
© Restricted DaLvery Fae
(Endorsement Required)
Ln n Tetal Postage & Fees
r-9 ��-�..v--
Sent To
rq
wrr n
StresL Apt. No.; --•-- -=-• • ---A ^t7 L,•h __�]•-•7 =-Ly;? -----.....--
d -- PO Box N-- 33 10`t
e» .�'�.4..__...'.._.5�..
an; state, rrP+a 1 --------------------- ---------------
hip1 �F} r'iS�i4
.ri il.
(Daawstfc Mair G
For delivery infortn,
Q
E'3 Postage $
r� rj
Certified Fee d
�
p Return Receipt Fee P159narkHem
p (Endorsement Required)
C7 Restricted Defrvery Fee
(Endorsement Required)
p
N Ln Total Postage & Fees
a
Sent To — —
ra Ytrr G1, \.
........---• --•-- 1 1 ..................••.......................
O Street, Apt. No.; �-•---
orPOBoxNo. :..............
Crty, State, IIP+4
PS Form
:rt Augusl 2006 See Reverse lot I"s1ruclions
d
Postage $
rl
M
Certified Fee
M
p
Return Receipt Frei
(Endorsement Required)
U.S.
Postal
Service,,,
CERTIFIED
Restricted Delivery Fee
MAILT,,
RECEIPT
p
(Endorsement Required)
2
(Donwdc
Mail
only;
No Insurance
Coverage provided)
Total Postage & Fees
Sent To
For delivery
information
L
visit our website
at www_usna_rnme
d
Postage $
rl
M
Certified Fee
M
p
Return Receipt Frei
(Endorsement Required)
Postmark
Here
E:3
Restricted Delivery Fee
p
(Endorsement Required)
r`-
�
Total Postage & Fees
Sent To
r-1
1"1 X11; s>�AptNo
L
Ip
Si
----------
[�
or PO Hox fJa. S S Fi
-------•--•-- �r�t•--
�i�t
Ciry. State, Z1P+d
---
--------------------------------
� 1„iA
PS :rr August 2006
115056
M
C3
_n Postage i
r_1
Certified Fee
Fostm rk
C3 Retum Receipt Fee
M ("cncorsement Required] Here
E3 Restricted Delivery Fee
(Endorsement Required)
t7
Iti
Lit Total Postage & Fees ,$
t-1
Sent to
r�
Streef,Apt. No.;
of PO Box NO.
------------------------------------------------ a� ....................................
City, Sfate, IIP+4
_PS Form :0r August 2006 See Reverse for Instructior=
f�
rR =
D
IT-
T_
0
Certified Fee
M 1 Postmark
Return Receipt Fee
0 (Endorsement Required) Here
Restricted Delimry Fee
(Endorsement Required)
Total Postage & Foos $
a
Sunt To - --
a 4
,—1 ----------__7l--�_------
or PO Box No.
I *--.-' — ---------------------------------------
--------
tarry. State, IlP+4
, � ,Wit 6A, 56
PS Form :0, August 2006 See Reverse for Instruclions
U.S. Postal Servicer. U.S. Postal ;
CERTIFIED MAIL. RECEIPT CERTIFIEI
(Domestic Mai! Only; Na Insurance Coverage Provided) ()omestic Mai! C
For delivery information visit our website at www.usps.cori For delivery inform
r. �
..D
Postage $
r -i
Certified Fee
Postrpark
C—)Rerr Receipt Fed „
(Endorssement Required)IM
19e
M Restricted Delivery Fee
(Fndorsement Required)
Ln l Total Postage & Fees $
r�
Sent Ta .}
rqv, Lh
ri -S`treat,Rpt.Np.;------------ ---.... -----�- -------.--
or Po par No. t \
r� '•----------------------------_
Crry, 57ate,71P+4 ""--""
PS Form
:rr August 2006 See Reverse for Instructlons
■ (Lmmesve Mall G
For delivery inform,
1
Postage S
r -a
Cerlified Fee
M
Postmark Return Receipt Fee Her
© (Endorsement Required)
0 Restricted Delivery Fee
(Endorsement Required)
O
f�
Ll Total Postage & Fees $
r -q
Sent To
r -R ---------------
_.... --- • - -------•----------
Strout, Apt. No.;
or PO Bax No.t
N -
------------------------------------------------------------
tai y. State, IIP+4
&tom}rte, 4th ' 9015,
PS form 3800. August 2006 See Reverse for Instructions—
t7'
._D
Postage $
r�
Certified Fee
M Postmark
p Retum Receipt Fee Mere
© (Endorsement Required)
© Restricted Delivery Fee
(Endorsement Required)
C�
frl
Lit Total Postage & Fees $
r -A
Sent To
°"� �` .�------------------------• - -
Streef, Apt.No.,
or PO Box No. fU ty y
...................................................
CIty, Statd, Z7?+4 h
RA on o -,9051
PS Form :rr August 2006
._L' Postage $
ri
Cert lied Fee
M
M Retum Receipt Fed Postmark
(Endorsement Required} Here
Restricted Delivery Fee
(Endorsement Required)
li
U.S.
Postal
Serviii
Sent Ta
-R
------•••-uhs-r2,•--�=---
`ri.S.A�?�----------------
T
Fwi
treef.AAt-Ivo.
or PO Box No. b
CERTIFIED
airy, state, SlP+4
MAIL,,, RECEIPT
t -t -J.", \,I
PS :rr August 2006
-■
(Domestic
Mai!
Only;
No Insurance
Coverage
Provided)
>•
For delivery
information
visit our website
at wwwmsps.comu
r.
._L' Postage $
ri
Cert lied Fee
M
M Retum Receipt Fed Postmark
(Endorsement Required} Here
Restricted Delivery Fee
(Endorsement Required)
li
Total Postage & Fees
Sent Ta
-R
------•••-uhs-r2,•--�=---
`ri.S.A�?�----------------
T
Fwi
treef.AAt-Ivo.
or PO Box No. b
airy, state, SlP+4
--------------------------•--•-
t -t -J.", \,I
PS :rr August 2006
C
See Reverse for Inst ions
is (uomesrfc mau e
rlllltrl
-■ fror deiiveayr infbI'M
Er--�
MRestage --I
r -q W
.ert:fied Foci
frl Postmark
© Relurn Recelpt Fee
M (Fndorsement Required) IrwB
Restricted Delivery Rae
(Endorsement Required)
tj
f�
u7 Total Postage & Fees $
r -q
Sent To
a -.;----- is 9)] Lug
-----------{ ------------------
Street. Apt NO ............................'------
n or POscxNo,
'a....:....._
Crty, State, ZIP+4 --------------------
PS Form
1,1A T4s(.
11 August 2006 See Reverse for Instructions
(Domestic Mall only; Nc
For delNery Informatlon vis
Er .. 11 .
Cl
-11Postage
r1
Cartiilod Fed
M Postmark
A Return Recelpt Fee Here
E:3(Endorsomont Required)
p Restricted Delivery Fee
(Endorsement Required)
»
�
Total Postage & Fees Is
1�
errt TO
Street, Apr.
or PO Box No. p
r'.......N-•....................
City, Sfaie, 21P+4
Rr.,4rh u� �KbS�
PS Form :rl August 2DOG See Reverse for instructions
ru
rL
ru
0
11-
.0
r-9
M
O
17:3
M
PostageI $
Certilled Fes Ir
Return Receipt Fee,
(Endorsement Required)
Restricted Delivery Fee
(Endorsement Required)
O
r`
LnTOW Pastege & Foes r$
r=I
U.S. Postal Service,.
CERTIFIED MAIL,. RECEIPT
Molimstic Mail Only; No Insurance Coverage Provided)
-. For delivery Information Welt our webalite at www.uaps.00rne
..
M - Poslmark
Rstum Rece pt Fee
(Endorsement Required) Here
Restrrcted Delivery Fee
(Endarsomcrit Required)
C3
Lrl
Total Postage & Fees
$
r -•l
Sent To
---a
--------
Street, Apt. No.:
,� ..z 1� tra - ---------------------------
r`
or PO Bnx NO. tt
- -----.b.. nam{U� A :?.. N E_..._.._..._
Crty, Stare. ZIP+4
----------------
�,�•�, UN �4oSL
PS Form :Yi August
2006
Postal Service,,,
3TIFIFD Mau _.. RFr_mr
{Domestic Mail Only; No Insurance Coverage Provided)
For delivery information visit our website at www.us 1-Iffie
1.
l�
Postage $
r -i
Certified fee
Return Receipt Pee
Postmark
M (Endorsement Required) Here
CD
© Restricted Delivery Fee
O (Endorsement RegWred)
Ln Totei Postage & Fees
rl
Sent To
..._� ::!4.!-_ 95 .............
5`frasr. Apt. lJo.; ------ !--••--•............ .. � -
or PO Boxft, w wUY`
Crfy, Srsto, 2fff --
:11 Ir.See Reverse for Instructions
n
Postmark
Here
Sent To
r -q C i htf
_;_________________ ___�9__
_
ri Street, Apf. No.���-
0 or PO Box No.3 >) y Z Y"'
- L--------------•---------------------------------
Orty Sfafa, Z--1 -P-+- t
�Lw.�lh LJ f4 �$t,51
PS Form
8003. August 2006 See Reverse for Instructions
z�
o m
o m
v rn
m
2
LO
s N
J � �
�ooa
_`L
Z
s � �
u
cc
Y
imp
O
CD
O
�*
W
w
�
L'
o
�a
z�
o m
o m
v rn
m
2
LO
s N
J � �
�ooa
_`L
Z
s � �
u
cc
Y
imp
f.s
�n
r.
It I
f r^ G,;-,
Eli .i
--
IA1
..Y
U
�-
Z. U
Y
to
7I
11�{
r c t4y
....
ei
n�
x -i
{i7
lit
iA
_
t-4
u
z
fly
0 Harbour
Hames TM
PROJECT NAME:
APPLICANT:
PROJECT LOCATION:
DATE OF PUBLIC MEETING/TIME:
Dear Resident,
NOTICE OF PUBLIC MEETING
THE PINES SUBDIVISION:
PRELIMINARY PLAT APPICATION
The Pines
Harbour Homes, LLC
850 & 870 Monroe Ave NE, Renton, WA 98056
Monday, June 6t4 from 5:00 to 6:15pm
Harbour Homes, LLC ("Harbour Homes") is preparing to submit a Preliminary Plat application to
build The Pines, a 14 lot subdivision at 850 and 870 Monroe Ave, Renton, WA 98056. These would be
spacious lots, all 5,000 square feet or higher, and would include a tree retention tract and a park at the
front of the plat along Monroe Ave NE.
Harbour Homes is a local, private company and has been building single family homes in the
Seattle area for over thirty years. You can read more about our company at https://ha rbourhomes.com.
Harbour Homes is excited for this opportunity to build in the neighborhood and is looking for
feedback from the community members. To that effect we are hosting a Community Meeting on
Monday, June 6th from 5:00 to 6:15pm at the Renton Highlands Library, 2801 NE 10th St, Renton, WA
98056. We cordially invite you to join us for a presentation and discussion of our proposed design and
project. We welcome your questions and input. Snacks and refreshments will be provided.
The intent of this meeting is to facilitate an informal discussion between Harbour Homes and
the neighbors regarding this project. While required by the City of Renton, this meeting is not conducted
by the City of Renton and is in addition to any future public hearing or public comment opportunities
available under City of Renton development review processes.
We look forward to meeting you and in the meantime, should you have any questions, please
feel free to contact myself at (206) 315-8130 or cburrus@harbourhomes.corn. Thank you for your
consideration and I do hope you will be able to join us on Monday, lune 61n.
Thank you,
Chris Burrus
Assistant Project Engineer
OA�2� 1-1�
igloo v i q- a Not
Rip"!
I MI
MIT
1M "0 "i 11
<1
3N 3A V Vf.0VA 70
3 z
El
Ln
SMA
py! Him
I -COO I i
its! 1.
- - - - - - - - - -
Mp
gyp
a
all 1
his
Lyn,
'Eli
- ;
BOW! is
_M Z
igloo v i q- a Not
Rip"!
I MI
MIT
1M "0 "i 11
11 IAV Mmow
Wxvz
too
xxxx-xxx S3NId THI
3N 3A V Vf.0VA 70
3 z
El
Ln
I -COO I i
� 7 F-
I'
- - - - - - - - - -
all 1
Lyn,
11 IAV Mmow
Wxvz
too
xxxx-xxx S3NId THI
The Pines Community Meeting
Renton Highlands Library- 5:00-6:15pm
Name Address Pone Email
■
r
i
;s
■
`jtf fL.:f Y., Y.i+\ l.til t , � .•�1fti.,l' L-�t �l�.�E IIiLJ �l L` l"1 L]'L\Lk
y1 l{ i
SFYi ll�, u.. �.l ✓, l`�1�1 JLC' ".:N yI� � � jy.�..., f, ,1.�- �y"\CQ
11'•v�LS�la,t {'��0'. 1, �i�� ���'f•.11 �5.� �. 1�'4t�,-� 'l , i, �i;. �'�—6•t,fC
T�ILrL Cekkr
Sig
�
C'sC�a ��- ��S>P� �•t..C'..,� �•-+t�� A„��1,� 1���' �„o. ij 14itt-��,�'ii
�i ll
'�.�pe�y� �nxff ,�rrta4�. r Not 5•.•t ,, l���- t �,,i4��� p'e�v, f .� t�
—1�,,�„�t
�tir X55 i�J,
■
r
HARBOUR HOMES LLC Pay: CITY OF RENTON Acct# :
DATE
INVOICE NO
DESCRIPTION
INVOICEAMOUNT
DEDUCTION
BALANCE
4-15-16
REQ041516
STINDE SEPA REVIF
1030.00
.00
1030.00
4-15-16
REQ041516A
STINDE PRELIM PLT
4789.50
.00
4789.50
CHECK
4-25-16
CHECK
56449
TOTAL-
581.9.50
.00
5819.50
DATE
NUMBER
PLEASE DETACH AND RETAIN FOR YOUR RECORDS
iu.r. rsln�w.lr..�„�e. �wum.ay siv` s tii. �s w
N✓L'— —
THE PINES xxx—xxxx
8
WNWp u
...... -------
__Ki_ AYE NE
� MONftOE
__
r
I I
I
F-7
8 +
a �
�= ceQseov
4 FQ yyysc slBW
I
a
P10
m
w
m
I�
L
�y
ae$eFF�FF�v�
��ewie
e
JI�
I
I
I
I
Iflr
C
n
�
i I
I � I
,e.r
--
—
�I I
ssro utV I
I
.�1�
{
IX YMPIA AVE NE
I
I
a
P10
m
m
I�
�y
ae$eFF�FF�v�
��ewie
e
JI�
I
I
I
I
Iflr
C
n
Fn
Ln
n
r.n..( •. �ao�s�o��swr�a n..nv.'�re�.M1Fw�u-�mscai e.[ er.'% 'e ,s[xw
"HCJ.0 tMli
THE PINES XXX—Xxxx
Y� re
co
n3�¢eP�n
�[p xu?F?�gg fir. �r33- h
Li � gi:Ck€ 8i 6>ci qs' =i't. vx
8 a
----- ---� —------- m_1--- ------ --- -- ------------------
n _ I
� a
La
ED
.16
F
I—
ggqR RRq�
4eee
Ira)
j
R^qR
s
Ml�MA' 3
X
zo - § $ � q
ak v
MAX
i Z� J 6 FF $ c)
o =Ov>v
S orQivM1n R F 6A83��e 4�� d8
O—R
§
; W2
)�
22 ;
tOM ,
Z�.
.2
z
\ .| o
»
; [f
I'p
w.°
!
. I
2E PINE
I
# R»
Px—C' —E
THE PINES F XXX—xXXx
+r W.. ,nrslnl•cw�',s�++v�'r�•lA'1M snrem. .y eM/hns .��sa w
PS'JW- w E
THE PINESxxl x—xxxx
titi R. xrel crferdns}4e.:grt/bl�}/nr m-wrrco;veq t/F/nri �.0-n' Rx
-,Cil ---
THE PINES xx
1
I 1I
I11 I I i
I
J ,
I
Z
+I
I
I IS
f
I
r � j
IfE I i I
Z
zo
=OCy�
$ 640n M N
Y
a o���
mm
\ l
ji V"
lov
THE PINES
4
I
PR
�»
�
a�
§/
�
m�.•t
\
h\■
�� PINES
LANDSCAPE PLAN
^.! U»■
22
«°
x
c
Q
4�
�n
z
�z
c�
m
D
m zmmemmzg
'44 1'Y4�Na�yA WOs
^•��LNLH NoopHp HHNH �
a m m N m a® v N m
C S C Zr
.F v
SUN
kLl
A$
M.
■
I
anaa�n��
oppi� 'na
1 � S
s $;
b V m
�v
an�n�ma�
b
� mm
wN<hH aH H
r4r � 4 r 4 0. r4
Sm �ti �G
9,
wwwwmw
a9 0 0sa
w
o`a aa`a `oo
aaaaaaa
ti
�,
Sfi7
THE PINES
LANDSCAPE PLAN
�*
t ��Y. R
"M, t
s
_ ���
RENSEONS
K.
_�K
n� eumeiol�eePJIJ We•rwSMrV+I�i+�e+e.e.r.�so +rbanir �. mrea
n2
5��
OC YMPIA A E NE
PIERCE AVE NE
H1WEC SME
THE RNEsxxl x_xxxx
n
CD
CD
0 0
n
Co
cD �
CD
w
CLCD
r-L�
� o
ce��
CD �
� cD
Cr
CD
I
0
-1
r�(-, p ri�w (')� USR
'ni`~�
s CCDO
R' in
ar
Qv�a°`q
0 2' =CD CCD n
00
°
°
�7
°
00�
Ln
() �' CD CDG 0
CD OC:l >4
R '
CD cD
CD
a SID d O`p @
�C
G
c� I'D
n
�
QO
a
o
n
CD
CDo
CD
im
�
'D
CD
CD
=t
oo¢ � CL
CD (D
CD '•�
CCD O CD
CL
FL '5r' s p Baa 5'� °
V)'c-n-o o n tnC]�D4-�
n F C w O n O f9 N n o f 7 [�v C. o o ro^ < c° n ro R O 7� -moi' 7L �. p C
G = D. R _a _� Z� ca F° 'o,(an-0 Ir" y11g -
gm 3
'3 `° Xy7�
6m 7' a Q—c° -c� W DRi acro ab r R] G.�vwpa n O O+y ��c o 7O {ypt7
.n.. �' 3 tiCD a '} '"' '�
�� 5 n�m� � o� � o�' '� � � � "�! „ y �v io ��
n_ v g w n On .T� c �: o G n mow-�� ��CX�pO
wn k7R Np XUCo Qp ¢% a C6 n v c3 vim- o' n
-wi a+ (: rn
yrs u�� O
0 0.� a�qt Iro
;
Z.en
`FC <c wa Qo .rFn cc `yl1 t�v i ? �.F r�° v_• `e a T R 'F `�zmr r
0 0 m� o= a �3 a� G C '_ —n
�° rn p- '3Fr n a� a a 3?^� a tCo �.d� rC o my" �p�M IF roman cT
Denis Law Mayor
City Clerk - Jason A. Seth, CMC
October 14, 2016
Jamie Waltier
Harbour Homes, LLC.
1441 N 30 St, #200
Seattle, WA 98103
Subject: Hearing Examiner's Final Decision
RE: The Pines Preliminary Plat (LUA-16-000413)
Dear Mr. Waltier
The City of Renton's Hearing Examiner has issued a Final Decision dated October 12, 2016.
This document is immediately available:
• Electronically online at the City of Renton City Clerk Division website at
www.rentonwa,gov/cityclerk. Click the "Hearing Examiner Decisions" link on the
right side of the screen located under the section titled, "Helpful Links." The
Hearing Examiner Decisions are filed by year and then alphabetical order by
project name.
• To be viewed at the City Clerk's office on the 711 floor or Renton City Hall, 1055
South Grady Way, between 8 am and 4 pm. Ask for the project file by the above
project number; and
• For purchase at a copying charge of $0.15 per page. The estimated cost for the
Hearing Examiner Documents is $2.40, plus a handling and postage cost (this cost
is subject to change if documents are added).
APPEAL DEADLINE: RMC 4-8-080 provides that the final decision of the Hearing Examiner
is subject to appeal to the Renton City Council. RMC 4-8-110(E)(14) requires appeals of
the Hearing Examiner's decision to be filed within fourteen (14) calendar days from the
date of the hearing examiner's decision. Appeals must be filed in writing together with
1055 South Grady Way, Renton, WA 98057 • (425) 430-6510 / Fax (425) 430-6516 • rentonwa.gov
the required fee to the City Council, City of Renton, 1055 South Grady Way, Renton, WA
98057. Additional information regarding the appeal process may be obtained from the
City Clerk's Office, Renton City Hall - 7th Floor, (425) 430-6510.
RECONSIDERATION: A request for reconsideration to the Hearing Examiner may also be
filed within this 14 day appeal period as identified in RMC 4-8-110(E)(13) and RMC 4-8-
100(G)(9). Reconsiderations must be filed in writing to the Hearing Examiner, City of
Renton, 1055 South Grady Way, Renton, WA 98057. Additional information regarding the
reconsideration process may be obtained from the City Clerk's Office, Renton City Hall -
7th Floor, (425) 430-6510. A new fourteen (14) day appeal period shall commence upon
the issuance of a reconsideration decision.
I can be reached at (425) 430-6510 orjseth@rentonwa.gov. Thank you.
Sincerely,
/6
on A. Seth, CMC
lerk
cc: Hearing Examiner
Matthew Herrera, Senior Planner
Jennifer Henning, Planning Director
Vanessa Dolbee, Current Planning Manager
Brianne Bannwarth, Development Engineering Manager
Craig Burnell, Building Official
Sabrina Mirante, Secretary, Planning Division
Julia Medzegian, City Council Liaison
Parties of Record (4)
1
2
3
4
5
6
7
8
9
la
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
BEFORE THE HEARING EXAMINER FOR THE CITY OF RENTON
}
RE: The Pines Preliminary Plat }
} FINAL DECISION
Preliminary Plat }
LUA 16-000413, ECF, PP, MOD
1/U::
The applicant requests preliminary plat approval for a 14 -lot residential subdivision along with three
street modifications, located at 850 and 870 Monroe Ave, Renton. The preliminary plat and street
modifications are approved with conditions.
TESTIMONY
Matthew Herrera, Renton Senior Planner, summarized the application.
Maher Joudi, applicant's engineer, testified in response to examiner questions that a plat to the south
with similar width to the project site was able to accommodate a cul-de-sac because at the time it was
approved, applicable King County regulations authorized cul-de-sacs of a significantly smaller radius
than that required under current regulations. As to a condition that restricts grading into driplines from
off-site trees, Mr. Joudi didn't believe that his client could be required to protect off-site trees unless it
is determined that the project would harm them.
Mr. Herrera noted that the dripline grading requirement is from the City's tree retention standards that
driplines be protected and that the standard doesn't distinguish between on and off-site trees.
PRELIMINARY PLAT - 1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
•
EXHIBITS
•
Exhibits 1-26 listed on page 2 of the September 26, 2016 Staff Report were admitted into evidence at
the public hearing. Additional exhibits admitted during the hearing include:
Ex. 27 City of Renton PowerPoint
Ex. 28 — City of Renton Core Maps (located on City's webpage)
FINDINGS OF FACT
Procedural:
1. Applicant. Harbour Homes, LLC.
2, Hearin. The Examiner held a hearing on the subject application on September 27, 2016 in the
City of Renton Council Chambers.
3. Project Description. The applicant requests preliminary plat approval for a 14 -lot residential
subdivision along with three street modifications for a 2.45 -acre project site located at 850 and 870
Monroe Ave, Renton. The subdivision will also include four tracts. Proposed lots range in size from
5,001 square feet to 5,201 square feet that result in an overall net density of 7.65 dwelling units per
acre. The proposed lots will be accessed from a new public residential access street off Monroe Ave
NE. Two existing single-family homes and their associated improvements will be removed to
accommodate the proposed subdivision.
The applicant requests three street modifications as follows:
• Modification Request l: RMC 4-6-060.F.2: Reduction in pavement width on Monroe
Avenue NE (minor arterial) from 54 -feet to approximately 44 -feet and a reduction in
sidewalk width from 8 -feet to 5 -feet.
• Modification Request 2: RMC 4-6-060.H.2: Allow hammerhead turnaround, in lieu
of a cul-de-sac, on a dead end street that is greater than 300 feet in length (Road A).
• Modification Request 3: RMC 4-6-060.11: Allow the use of a shared driveway in a
subdivision with ten (10) or more lots.
PRELIMINARY PLAT - 2
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
•
4. Adequacy of Infrastructure/Public Services. The project will be served by adequate and
appropriate infrastructure and public services as follows:
A. Water and Sewer Service. Water and sewer service will be provided by the City of Renton.
B. Police and Fire Protection. Police and Fire Prevention staff indicate that sufficient
resources exist to furnish services to the proposed development; subject to the condition
that the applicant provides code required improvements and fees. Fire impact fees are
applicable at the rate of $495.10 per single family unit.
C. Drainage. Drainage will be adequately addressed. According to the Preliminary Technical
Information Report (Ex. 10), the project is required to provide Level 2 Flow Control and
Basic Water Quality Treatment. The development is subject to Full Drainage Review in
accordance with the 2009 King County Surface Water Design Manual (KCSWDM) and
the City of Renton Amendments to the KCSWDM. All core and special requirements have
been discussed in the TIR.
Stormwater improvements proposed to accommodate the new development will consist of
a detention vault to provide flow control for the new and replaced impervious surfaces with
a wet vault component that will provide the required Basic Water Quality. The vault shall
be designed in accordance with the KCSWDM and the City of Renton Amendments to the
manual. Separate structural plans will be required to be submitted for review and approval
under a separate building permit for the detention and water quality vault. Special
inspection from the building department is required.
D. Parks/Open Space. The proposal provides for adequate and appropriate provision for parks
and open space. The adequacy of parks and open space is set by city code. No park
mitigation or open space is required by the Renton Municipal Code beyond park mitigation
fees.
E. Streets. The proposal provides for adequate and appropriate streets. Preliminary
conformance to street standards and adequacy of alignment has been reviewed and
approved by public works. Frontage improvements along Monroe Ave NW, a minor
arterial, will be provided, including curb, gutter, planting strip and sidewalks with a 5.7
foot right of way dedication. Pavement width allows for parking on one side with the
exception of any area needed for the Fire Department turnaround needs. Internal road
access is proposed via the dedication of Road A, which connects to Monroe Ave NE and
contains a hammerhead turn around as opposed to a cul-de-sac as approved by the
modifications approved by this decision.
PRELIMINARY PLAT - 3
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
The applicant has submitted a Vehicle Trip Memorandum (Exhibit 17) that indicates the
proposed 14 -lot subdivision would generate 114 new trips per weekday, with 9 of those
trips generated during the AM peak hour (2 in, 7 out) and 12 during the PM peak hour (8
in, 4 out). The project has passed the City of Renton Traffic Concurrency Test (Exhibit
25). No sight distance limitations have been identified at the intersection of proposed Road
A and Monroe Ave NE
Public works staff have determined that it is not anticipated that the proposed project would
adversely impact the City of Renton's street system subject to the payment of code -required
impact fees and the construction of code -required frontage improvements.
F. Tree Retention. As conditioned, the proposal complies with the City's tree retention
standards. The City's adopted Tree Retention and Land Clearing Regulations require the
retention of 30 percent of trees in a residential development. The applicant submitted a
Tree Retention Worksheet (Exhibit 23), Arborist report (Exhibit 12) and Tree Cutting and
Land Clearing Plan (Exhibit 11) with the project application. Each of these documents
identifies 57 trees on the subject property. Of these 57 trees, 15 are located within the
proposed new residential street right-of-way or within the right-of-way frontage
improvements that will be provided along Monroe Ave NE. The arborist report has also
identified 17 trees that are non-viable or otherwise dead, diseased, or dying. This results in
25 significant trees subject to the 30 percent retention standard. The applicant's Tree
Cutting and Land Clearing Plan proposes to retain a total of 9 significant trees or 36 percent
of the subject property's significant trees. A Tree Retention Tract (Tract A) is proposed
along the Monroe Ave NE frontage that will contain eight (8) trees and proposed lot 5 will
retain one (1) tree along its northern boundary.
The Tree Cutting and Land Clearing Plan and Conceptual Road and Grading Plan (Exhibit
4) shows grading work within the drip line of offsite trees abutting the subject property,
which may not comply with protection measures during construction set forth in RMC 4-
4-130H9a. The applicant questioned the validity of this requirement during the hearing,
taking the position that they had no responsibility to protect the roots of off-site trees. A
recent appeals court decision has ruled that a property owner is entitled to remove tree roots
that have encroached onto his property and in so doing has no duty to the tree owner to
prevent damage to the off-site tree. See Mustoe v. Ma, 193 Wn. App. 161 (2016). Although
the applicant may have no common law obligation to protect the dripline of off-site trees,
this doesn't address the issue of whether City regulations can validly require them to be
protected anyway. The purpose of the City's tree retention standards include preserving
aesthetic character, providing for open space, protecting wildlife habitat, minimizing
PRELiM1NARY PLAT - 4
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
surface water and groundwater runoff and diversion and enhancing property values. See
RMC 4-4-130. These purposes are ultimately directed at mitigating problems caused by
development. So long as the drip line protection standards are applied proportionally to all
developers, there should not be a legal problem' in enforcing them. See, e.g., Burton v.
Clark County, 91 Wn. App. 505, 522-23 (1998)(there must be nexus and rough
proportionality between problems caused by development and the exactions imposed to
mitigate them). To provide for rough proportionality, however, the driplines that are
required to be protected should be the driplines of trees required to be retained by the City's
tree retention standards. Otherwise, a developer could be caught having to protect a
disproportionate number of trees simply because an adjoining property owner has decided
to retain significantly more trees than required by city regulations. In this regard, the
requirement of RMC 4-4-1301-19a that the driplines of "retained" trees shall be construed
as trees required to be protected by the City's tree retention ordinance and the associated
condition recommended by staff will be revised accordingly.
G. Landscaping.. As determined by staff in the staff report, as conditioned the proposal
satisfies the City's landscaping requirements. The applicant proposes an 8 -foot wide
planting strip along project street frontage and 56 new trees throughout the project site
including various maple, flowering pear and cherry, and western red cedar. Deciduous trees
are to be planted with 1.5 -inch caliper and the western red cedar will have a minimum
height of 6 -feet at time of planting. The applicant is proposing a 1,020 square foot
landscape tract at the dead end of the new residential street. The tract will include trees,
shrubs, groundcover, and mulch. All proposed vegetation within the tract is identified as
drought tolerant in the landscaping plan plant schedule. Additional trees, shrubs, and
groundcover are proposed to augment the Tree Retention Tract A and eastern perimeter
planting within Stormwater Tract D. All proposed vegetation within these tracts has also
been identified as drought tolerant. No vegetation other than lawn is shown for the
remainder of Tract D. Therefore, as a condition of approval, a final landscaping plan shall
be submitted that provides a landscaping strip 15 -feet in width surrounding the drainage
tract as required by RMC 4-4-074H6. Additionally, during the required neighborhood
meeting (Exhibit 24) there was concern regarding children playing within the tract abutting
'Although the Examiner has to make every effort to construe City development standards in a manner that is consistent
with superseding constitutional and statutory requirements, the Examiner has no authority to otherwise rule on the
validity of a City development standard. Vegetation retention standards have been overturned by the courts on the
basis that the retention standards are reasonably necessary as a direct result of the proposed development. See Citizens
Alliance far Property Rights v. Sims, 145 W n. App. 649 (2008), review denied, 165 Wn_2d 1030 (2009). The Examiner
makes no conclusions or findings as to the validity of the City's tree retention standards under Citizens Alliance, since
this addresses the validity of the tree regulation standards as a whole as opposed to facilitating the interpretation of
any potentially ambiguous terms.
PRELIMINARY PLAT - 5
2
3
4
5
6
7
8
9
10
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Monroe Ave NE without a barrier. Therefore, a condition of approval requires a berm at
least three (3) feet in height along the Monroe Ave NE frontage to provide a physical barrier
in addition to the landscaping noted above.
H. Parkin. Sufficient area exists, on each lot, to accommodate off-street vehicular parking.
This is typically achieved by providing a two (2) car garage for each single-family home.
Compliance with individual driveway requirements would be reviewed at the time of
building permit review.
Schools. It is anticipated that the Renton School District can accommodate any additional
students generated by this proposal at the following schools: Highlands Elementary,
Dimmitt Middle School and Renton High School. Any new students from the proposed
development would be bussed to middle and high schools. The stops are located at Monroe
Ave NE and NE6th PI. and Olympia Ave NE and NE 10th Lane, respectively. Students
are within walking distance of Highlands Elementary. The proposed project includes the
installation of frontage improvements along the Monroe Ave NE frontage, including
sidewalks. Students would walk south on the west side of Monroe Ave NE to NE 7th St.
and proceed west to Harrington Ave NE and then proceed north to Highlands Elementary.
There are existing sidewalks on at least one side of each walking route with the exception
of the Renton High School bus stop stretch along Olympia Ave NE between NE I Oth St.
and NE 10th Ln. which is classified as a residential access street containing an approximate
18 -foot shoulder with typical residential lawns. Therefore, there are safe walking routes to
Highlands Elementary and the school bus stops.
A School Impact Fee, based on new single-family lots, will be required in order to mitigate
the proposal's potential impacts to the Renton School District. The fee is payable to the
City as specified by the Renton Municipal Code. Currently the fee is assessed at $5,643.00
per single family residence.
5. Adverse Impacts. There are no adverse impacts associated with the proposal. As discussed in
Finding of Fact No. 4, the proposal provides for adequate infrastructure and is served by adequate
public services. Beyond the adequacy of infrastructure, there are no other significant adverse impacts
discernable or reasonably suggested from the record. The site is mapped with a moderate landslide
hazard area in the central and western portion of the subject property. Existing site topography is
relatively flat with 10-fect of relief over approximately 500 -feet and geotechnical analysis prepared
by the applicant (Exhibit 8) indicated no potential hazard on or near the subject property. Beyond the
landslide hazard refuted by the applicant, there are no other critical areas on the site. There are no
compatibility issues associated with the development as all surrounding development is residential at
a similar density.
PRELIMINARY PLAT - 6
I
2 Conclusions of Law
3
1. Authority. RMC 4-9-080(G) classifies preliminary plat permit review as a Type III decision
4 and a street modification as a Type I decision. RMC 4-8-080(C)(2) requires consolidated permits to
S each be processed under "the highest -number procedure", which in this case is Type III. A Type IIl
6 process authorizes the hearing examiner to hold a hearing and issue a final decision.
2. Zoning/Comprehensive /�prehensive Plan Designations. The subject property is zoned Residential -8
7
dwelling units per net acre (R-8). The comprehensive plan map land use designation is Residential
8 Medium Density.
9 3. Review Criteria/Street Modification. Chapter 4-7 RMC governs the criteria for subdivision
10 review. Applicable standards are quoted below in italics and applied through corresponding
conclusions of law. Finding of Fact No. 20 of the staff report is adopted in full as the findings and
I 1 conclusions for approval of the street modification requests identified in Finding of Fact No. 3 of this
12 decision.
13 Preliminary Plat
14 RMC 4-7-080(B): A subdivision shall be consistent with the following principles of acceptability:
15 1. Legal Lots: Create legal building .sites which comply with all provisions of the City Zoning Code.
16 2. Access: Establish access to a public road for each segregated parcel.
17 3. Physical Characteristics: Have suitable physical characteristics. A proposed plat may be denied
18 because of flood, inundation, or wetland conditions. Construction of protective improvements may be
required as a condition of approval, and such improvements shall be noted on the final plat.
I9
4. Drainage: Make adequate provision for drainage ways, streets, alleys, other public ways, water
20 supplies and sanitary wastes.
21 4. As conditioned, this criterion is satisfied. The proposed lots comply with the zoning code as
22 set out in Finding of Fact No. 18 of the staff report. Each of the lots will have access to Monroe
Avenue NE via Road A, which will be dedicated as a public street. As determined in Finding of Fact
23 No. 5, there are no critical areas on the project site, including frequently flooded areas or wetlands.
As determined in Finding of Fact No. 4, the proposal will be served by adequate infrastructure and
24 public services.
25 RMC 4-7-080(I)(1): ... The Hearing Examiner shall assure conformance with the general purposes
26 1 of the Comprehensive Plan and adopted standards...
PRELIMINARY PLAT - 7
0 0
1 5. The proposed preliminary play is consistent with the Renton Comprehensive Plan as outlined
2 in Finding of Fact No. 17 of the staff report.
3 RMC 4-7-120(A): No plan for the replatting, .subdivision, or dedication of any areas shall be
approved by the Hearing Examiner unless the streets shown therein are connected by surfaced road
4 or street (according to City specifications) to an existing street or highway.
5 6. All lots will access Monroe Avenue via Road A, which will be dedicated to the public.
6 RMC 4-7-120(B): The location of all streets shall conform to any adopted plans for streets in the
7 City.
8 7. Public works has reviewed the proposal and found conformance to all City street standards,
including street plans. Therefore, in the absence of any evidence to the contrary, the preponderance
of evidence establishes that the proposal conforms to adopted plans for streets in the City.
10
RMC 4-7-120(C): If a subdivision is located in the area of an officially designed [sic] trail,
11 provisions shall be made_for reservation of'the right-of-way or for easements to the City for trail
12 purposes.
13 8. Public works has reviewed the proposal and found conformance to all City street standards,
including trail plans. Therefore, in the absence of any evidence to the contrary, the preponderance of
14 evidence establishes that the proposal accommodates plans for trails in the City.
15 RMC 4-7-130(C): A plat, short plat, subdivision or dedication shall be prepared in conformance
16 with the following pro visions:
17 1_ Land Unsuitable for Subdivision: Land which is found to be unsuitable for subdivision includes
land with features likely to be harmful to the safety and general health of the future residents (such as
18 lands adversely a fcted hYoodin ,steep slopes, or rockformations). Land which the Department
19 or the Hearing Examiner considers inappropriate for subdivision shall not be subdivided unless
20 adequate safeguards are provided against these adverse conditions.
a. Flooding/Inundation: If any portion of the land within the boundary of a preliminary plat is
21 subject to flooding or inundation, that portion of 'the subdivision must have the approval of the State
22 according to chapter 86.16 RCW before the Department and the Hearing Examiner shall consider
such subdivision.
23
24 b. Steep Slopes: A plat, short plat, subdivision or dedication which would result in the creation of a
lot or lots that primarily have slopes forty percent (40%) or greater as measured per RMC 4-3-
25 050Jl a, without adequate area at lesser slopes upon which development may occur, shall not be
26 approved.
PRELIMINARY PLAT - 8
l ..
2 3. band Clearing and Tree Retention: Shall comply with RMC 4-4-130, Tree Retention and Land
3 Clearing Regulations.
4 4. Streams:
5 a. Preservation: Every reasonable effort shall be made to preserve existing streams, bodies of water,
and wetland areas.
6
7 b. Method: If a stream passes through any of 'the subject property, a plan shall be presented which
indicates how the stream will be preserved. The methodologies used should include an overflow
S area, and an attempt to minimize the disturbance of'the natural channel and stream bed,
9 c. Culverting: The piping or tunneling of water shall be discouraged and allowed only when going
10 under streets.
I I d. Clean Water: Every effort shall be made to keep all streams and bodies of water clear of debris
and pollutants.
12
9. As discussed in Conclusions of Law No. 4 and Finding of Fact No. 5, and as conditioned, the
13 land is suitable for development. The property is not designated as a floodplain and no adverse impacts
14 to critical areas are anticipated since no critical areas (including streams, wetlands and steep slopes)
are on site. The proposal conforms to the City's tree retention standards as determined in Finding of
15 Fact No. 4,
16 RMC 4-7-140: Approval ofall subdivisions located in either single family residential or multi family
17 residential zones as defined in the Zoning Code shall he contingent upon the subdivider's dedication
18
of land or providing fees in lieu of dedication to the City, all as necessary to mitigate the adverse
effects of development upon the existing park and recreation service levels_ The requirements and
19 procedures for this mitigation shall be per the City of Renton Parks Mitigation Resolution.
20 10. The developer will be required to pay park impact fees at the time of building permit
21 issuance as required by City code.
22 RMC 4-7-150(A): The proposed street system shall extend and create connections between existing
streets unless otherwise approved by the Public Works Department. Prior to approving a street system
23 that does not extend or connect, the Reviewing Official shall find that such exception shall meet the
24 requirements of subsection E3 of this Section. The roadway classifications shall be as defined and
designated by the Department.
25
11. The internal road, Road A, connects to Monroe Avenue NE. No other road connections are
26 possible due to the existence of intervening lots.
PRELIMINARY PLAT - 9
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
•
RMC 4-7-150(B): All proposed street names shall be approved by the City.
12. As conditioned.
RMC 4-7-150(C): Streets intersecting with existing or proposed public highways, major or
secondary arterials shall he held to a minimum.
13. The proposed street connection, to a minor arterial, is the only street connection possible for
the development.
RMC 4-7-150(D): The alignment of all streets shall be reviewed and approved by the Public Works
Department. The street standards set by RMC 4-6-060 shall apply unless otherwise approved. Street
alignment offsets of less than one hundred twenty-five feet (125 ) are not desirable, but may be
approved by the Department upon a showing of need but only after provision of all necessary safety
measures.
14. As determined in Finding of Fact 4, the Public Works Department has reviewed and approved
the street alignment. Street alignment is clearly more than 125 feet as required.
RMC 4-7-150(E):
1. Grid: A grid street pattern shall be used to connect existing and new development and shall be the
predominant street pattern in any subdivision permitted by this Section.
2. Linkages: Linkages, including streets, sidewalks, pedestrian or bike paths, .shall be provided
within and between neighborhoods when they can create a continuous and interconnected network
of roads and pathways. Implementation of this requirement shall comply with Comprehensive Plan
Transportation Element Objective T -A and Policies T-9 through T-16 and Community Design
Element, Objective CD -Mand Policies CD -50 and CD -60.
3. Exceptions:
a. The grid pattern may be adjusted to a "flexible grid" by reducing the number o_f linkages or the
alignment between roads, where the followingfactors are present on .site:
i. Infeasible due to topographical/environmental constraints,- and/or
ii. Substantial improvements are existing.
4. Connections: Prior to adoption of a complete grid street plan, reasonable connections that link
existing portions of the grid system shall be made. At a minimum, stub streets shall be required
within subdivisions to allow future connectivity.
PRELIMINARY PLAT - 10
0
1 S. Alley Access: Alley access is the preferred street pattern except for properties in the Residential
Low Density land use designation. The Residential Low Density land use designation includes the
2 RC, R-1, and R-4 zones. Prior to approval cif a plat without alley access, the Reviewing Official shall
3 evaluate an alley layout and determine that the use of alley (s) is not feasible_..
4 6. Alternative Configurations: Offset or loop roads are the preferred alternative configurations.
5 7. Cul -de -Sac Streets: Cul-de-sac streets may only be permitted by the Reviewing Official where due
to demonstrable physical constraints no future connection to a larger street pattern is physically
6
possible.
<<
7
15. The project provides as much connectivity as is feasible given that it is completely surrounded
8 by development on three sides. Alley access is not possible given the narrow width of the project site.
9 Similarly, the hammerhead (which serves the same function as a cul-de-sac) is necessary due to the
narrow width of the project site.
10
RMC 4-7-150(F): All adjacent rights-of=way and new rights-of-way dedicated as part of the plat,
11 including streets, roads, and alleys, shall be graded to their full width and the pavement and sidewalks
12 shall he constructed as specified in the street standards or deferred by the PlanningBuilding/Public
Works Administrator or his/her designee.
13
16. As proposed and as will be required during engineering review.
14
RMC 4-7-150(G): Streets that may he extended in the event of future adjacent platting shall be
15 required to be dedicated to the plat boundary line. Extensions of greater depth than an average lot
16 shall he improved with temporary turnarounds. Dedication of a full -width boundary street shall be
17 required in certain instances to facilitate,future development.
18 17. There are no further street extensions possible for the proposed subdivision.
19 RMC 4-7-170(A): Insofar as practical, side lot lines shall he at right angles to street lines or radial
to curved street lines.
20
18. As depicted in Ex. 2, the side lines are in conformance with the requirement quoted above.
21
RMC 4-7-170(B): Each lot must have access to a public street or road. Access maybe by private
22 access easement street per the requirements of the street standards.
23 14. As previously determined, each lot has access to a public street or road.
24
RMC 4-7-170(C): The size, shape, and orientation of lots shall meet the minimum area and width
25 requirements of the applicable zoning classification and shall be appropriate for the type of
26 development and use contemplated. Further subdivision of lots within a plat approved through the
PRELMNARY PLAT - 11
0 0
1 provisions of this Chapter must be consistent with the then -current applicable maximum density
2 requirement as measured within the plat as a whole.
3 20. As previously determined, the proposed lots comply with the zoning standards of the R-8 zone,
which includes area, width and density.
4
RMC 4-7-170(D): Width between side lot lines at their foremost points (i.e., the points where the side
5 lot lines intersect with the street right-of-way line) shall not be less than eighty percent (80%) of the
6 required lot width except in the cases of (1) pipestem lots, which shall have a minimum width of twenty
feet (20) and (2) lots on a street curve or the turning circle of ctrl -de -sac (radial lots), which shall be
7 a minimum of thirty-five feet (35).
8 21. As shown in Ex. 2, the requirement is satisfied.
9 RMC 4-7-170(E): All lot corners at intersections of dedicated public rights-of-way, except alleys,
10 shall have minimum radius of fifteen feet (15).
11 22. As proposed.
12 RMC 4-7-190(A): Due regard shall be shown to all natural features such as large trees,
13 watercourses, and similar community assets. Such natural features should be preserved, thereby
adding attractiveness and value to the property.
14
23. There are no critical areas on-site and significant trees are retained to the extent required by
15 the City `s tree retention ordinance as determined in Finding of Fact No. 4 so the criterion is deemed
16 met.
17 RMC 4-7-200(A): Unless septic tanks are specifically approved by the Public Works Department
and the King County Health Department, sanitary sewers shall be provided by the developer at no
18 cost to the City and designed in accordance with City standards. Side sewer lines shall be installed
19 eight feet (8) into each lot if sanitary sewer mains are available, or provided with the subdivision
20 development.
24. As conditioned.
21
22 RMC 4-7-200(B): An adequate drainage system shall be provided for the proper drainage of all
surface water. Cross drains shall be provided to accommodate all natural water flow and .shall be of
23 sufficient length to permit full -width roadway and required slopes. The drainage system shall be
24 designed per the requirements of RMC 4-6-030, Drainage (Surface Water) Standards. The drainage
system shall include detention capacity for the new street areas. Residential plats shall also include
25 detention capacityfor future development of the lots. Water quality. features shall also be designed to
26 provide capacity for the new street paving for the plat.
PRELIMINARY PLAT - 12
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
U
•
25. As determined in Finding of Fact No. 4, the proposal provides for adequate drainage that conforms
to all applicable drainage standards.
RMC 4-7-200(C): The water distribution system including the locations of fire hydrants shall be
designed and installed in accordance with City standards as defined by the Department and Fire
Department requirements_
26. This requirement will be imposed during engineering review or final plat approval.
RMC 4-7-200(D): All utilities designed to serve the subdivision shall be placed underground. Any
utilities installed in the parking strip shall be placed in such a manner and depth to permit the planting
of trees. Those utilities to be located beneath paved surfaces shall be installed, including all service
connections, as approved by the Department. Such installation shall be completed and approved prior
to the application of any surface material. Easements may be required for the maintenance and
operation of utilities as specified by the Department.
27. As conditioned.
RMC 4-7-200(E): Any cable TV conduits shall be undergrounded at the same time as other basic
utilities are installed to serve each lot. Conduit for .service connections shall be laid to each lot line
by subdivider as to obviate the necessity for disturbing the street area, including sidewalks, or alley
improvements when such service connections are extended to serve any building. The cost of
trenching, conduit, pedestals and/or vaults and laterals as well as easements therefore required to
bring service to the development shall be borne by the developer and/or land owner. The subdivider
shall be responsible only for conduit to serve his development. Conduit ends shall be elbowed to final
ground elevation and capped. The cable TV company shall provide maps and specifications to the
subdivider and shall inspect the conduit and certify to the City that it is properly installed.
28. As conditioned.
RMC 4-7-210:
A. MONUMENTS,
Concrete permanent control monuments shall be established at each and every controlling corner of
the subdivision. Interior monuments shall be located as determined by the Department. All surveys
shall be per the City of Renton surveying standards.
B. SURVEY -
All other lot corners .shall be marked per the City surveying standards_
C. STREET SIGNS.
PRELIMINARY PLAT - 13
4
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
L'
The .subdivider shall install all street name signs necessary in the subdivision.
29. This requirement will be imposed during engineering review for final plat approval.
DECISION
The proposed preliminary plat, site plan is approved and street modifications are approved, subject to
the following conditions:
The applicant shall provide a final detailed landscaping plan compliant with RMC 4-8-
120D at the time of Utility Construction Permit review that provides 15 -feet of landscaping
surrounding stormwater Tract D. The vault may encroach into the landscaping screen,
provided the landscaping can still be planted on top of the vault. The final landscaping plan
shall be approved prior to Utility Construction Permit issuance. All tract landscaping shall
be installed and inspected prior to plat recording.
2. The applicant shall provide a final landscaping plan for review and approval by the Current
Planning Project Manager at the time of Utility Construction Permit review that provides
a berm within the 15 -foot landscaping screen in stormwater Tract D along the Monroe Ave
NE frontage. The final landscaping plan shall be approved prior to Utility Construction
Permit issuance. The berm shall be installed and inspected prior to plat recording.
3. The applicant shall be required to create a homeowner's association for the shared
maintenance and responsibility of the shared tracts and all other shared improvements of
this development. A draft of the document(s) shall be submitted to Current Planning
Project Manager for the review and approval by the City Attorney and Property Services
section prior to the recording of the final plat. The HOA documents shall be recorded
concurrently with the final plat.
4. The applicant shall provide a Road and Grading Plan for review and approval by the
Current Planning Project Manager at the time of Utility Construction Permit review that
provides tree protection measures identified in RMC 4-4-130H9 for offsite trees with drip
lines that are within the subject property; Provided that the "retained" trees referenced in
4-4-130H9 are construed as trees required to be retained (either by the applicant or
previously by adjoining property owners) by the City's tree retention standards.
5. The applicant shall provide a final landscaping plan for review and approval by the Current
Planning Project Manager at the time of Utility Construction Permit review that provides
details of split -rail fencing around Tree Retention Tract A and signage identifying the tract
as tree protection. Split -rail fencing and signage shall be installed and inspected prior to
final plat recording.
6. The applicant shall revise the Preliminary Plat for review and approval by the Current
Planning Project Manager at the time of Utility Construction Permit review that provides
a front yard setback variation for at least one (1) lot for every four (4) abutting street
fronting lots and the varied setbacks shall be provided as a note on the face of the plat.
PREL[MiNARY PLAT - 14
2
4
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
7. The applicant shall provide a plat layout color palette for the new single family homes for
review and approval by the Current Planning Project Manager prior to plat recording.
8. The applicant shall provide a revised paving plan for review and approval by the Current
Planning Project Manager, at the time of Utility Construction Permit review identifying
the modified Monroe Ave NE street section, as approved through Modification Request 1,
9. All future homes within the subdivision shall have a fire sprinkler system approved by the
Renton Fire Authority.
10. The applicant shall provide a note on the face of the plat restricting access for lots 5 and 6
to the shared driveway. The front of the future homes on lots 5 and 6 shall be oriented to
the new residential street (Road A) with garages located on the side or rear of the homes.
11. The applicant shall submit revised plans for review and approval by the Current Planning
Project Manager at the time of Utility Construction Permit review removing the four (4)
pedestrian ramps facing east along Monroe Ave NE.
12. All proposed street names shall be approved by the City.
13. Side sewer lines shall be installed eight feet (8') into each lot if sanitary sewer mains are
available, or provided with the subdivision development.
14. All utilities designed to serve the subdivision shall be placed underground. Any utilities
installed in the parking strip shall be placed in such a manner and depth to permit the planting
of trees. Those utilities to be located beneath paved surfaces shall be installed, including all
service connections, as approved by the Department of Public Works. Such installation shall
be completed and approved prior to the application of any surface material. Easements may be
required for the maintenance and operation of utilities as specified by the Department of Public
Works.
15. Any cable TV conduits shall be undergrounded at the same time as other basic utilities are
installed to serve each lot. Conduit for service connections shall be laid to each lot line by
Applicant as to obviate the necessity for disturbing the street area, including sidewalks, or alley
improvements when such service connections are extended to serve any building. The cost of
trenching, conduit, pedestals and/or vaults and laterals as well as easements therefore required
to bring service to the development shall be borne by the developer and/or land owner. The
applicant shall be responsible only for conduit to serve his development. Conduit ends shall be
elbowed to final ground elevation and capped. The cable TV company shall provide maps and
specifications to the applicant and shall inspect the conduit and certify to the City that it is
properly installed.
PRELIMINARY PLAT - 15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
•
DA'Z'ED this 12" day of October, 2016.
•
Phi A.Olbrmhls
City of Renton Hearing Examiner
APPEAL RIGHTS AND VALUATION NOTICES
RMC 4-8-080(G) provides that the final decision of the hearing examiner is subject to appeal to the
Renton City Council. RMC 4-8-110(E)(14) requires appeals of the hearing examiner's decision to
be filed within fourteen (14) calendar days from the date of the hearing examiner's decision. A
request for reconsideration to the hearing examiner may also be filed within this 14 day appeal period
as identified in RMC 4-8-100(G)(9). A new fourteen (14) day appeal period shall commence upon
the issuance of the reconsideration. Additional information regarding the appeal process may be
obtained from the City Clerk's Office, Renton City Hall 7th floor, (425) 430-6510.
Affected property owners may request a change in valuation for property tax purposes
notwithstanding any program of revaluation.
PRELIMINARY PLAT - 16
•
October 14, 2416
CERTIFICATE OF MAILING
STATE OF WASHINGTON ]
COUNTY OF KING ]
JASON A. SETH, City Clerk for the City of Renton, being first duly sworn on oath, deposes and
says that he is a citizen of the United States and a resident of the State of Washington, over the
age of 21 and not a party to nor interested in this matter.
That on the 14t' day of October, 2016, at the hour of 4:30 p.m. your affiant duly mailed and
placed in the United States Post Office at Renton, King County, Washington, by first class mail
the HEX's Final Decision for The Pines Preliminary Plat (LUA-16-000413) to the attached parties
of record.
Jason J. Seth, CMC, City Clerk
SUBSCRIBED AND SWORN TO BEFORE me this 14' day of October, 2016.
CynthiA, R.oya
Notary Pub is in and for the State of Was6ir$pn r
Residing in Renton %, �`';" �>, "'w
My Commission expires: 8/27/2018 ��i�
Beverly Stinde Beverly Stinde
19807 SE 300th St 19807 SE 300th St
Kent, WA 98042 Kent, WA 98042
Jamie Waltier Maher Joudi
Harbour Homes, LLC D.R. Strong Consulting Engineers
1441 N 34th St, 200 620 7th Ave
Seattle, WA 98103 Kirkland, WA 98033
Beverly Stinde
19807 SE 300th St
Kent, WA 98042
•
CITY OF RENTON
DEPARTM ENT OF COMMUNITY AND
ECONOMIC DEVELOPMENT
HEARING EXAMINER DECISION, EXHIBITS
Project Name:
Project Number:
The Pines Preliminary Plat
LUA16-000413,ECF,PP,MOD
Date of Hearing
Staff Contact
Project Contact/Applicant
Project Location
September 27, 2016
Matthew Herrera, Senior Planner
Jaime waltier, Harbour Homes
850 Monroe Ave NE
The following exhibits were admitted during the hearing:
Exhibits 1-26: Hearing Examiner Staff Report and Exhibits
Exhibit 27: Staff PowerPoint Presentation
Exhibit 28: City of Renton COR Maps (located on City's webpage):
http://rp.rentonwa.gov/SilverlightPublic/Viewer.html?Viewer=COR-Maps
r+
cr
r+
cr
C
N
�
w
f-+ CL
CD
tD Ln
00 CL)
N r+
0
orq Z)
CL
O
0
3
�o
Ln
ED
CDfD
z
m
tD
r+
=r
V)
r+
a
C)7
(D
r+
:E
(D
rD
=3
z
m
00
to
fD
0)
to
r-+
LA
C:L
(D
0
h
r-
0
n
CD
CL
0
rt
(D
7�0
mm
a
3
Q
ul
C
LA fD
n CL
Ca
fD
C '
Ift
0
N
Ln
■
� i
0 0
3 W
Ln w
0�
0 _.
�" =3
c •
0
LA
NT
m
Ln
n
r+ o
CL ul
fD
=3 -a
r+
r)
0
h L-
r+
z
0
ro
CU
V)
rD
rD
CL
cn
rD
3
cr
m
N
0
M
CL
r�
r�
CL
0
ra
3
cr
r�
F"
M
•
N
N
0
CL
rD
aj
73
rQ
M.
a
CL
rD
aq
0
a
rD
rn
OMI3
o'
0
z
0
Un
arq'
ro
0
r�
n
0
3
3
ra
Ln
r�
ro
cr
3
Cl.
r�
r�
OE
arQ
Ln
N
0
vn
w
0
D
arq
Ln
WftN
0
F"
a�
•
OE
c-
ro
ar�q`J
0
z
ra.
a'Q
0-
0
zr
0
0
CL
K
ro
rD
CL
rD
N
0
cn
0
0
�-
<
ro
ra
3
r+
0
0
3
Ln
0
(D
0
0
Ln
<
cu
0
o
0
3
T
3
<
CL
DJ
(D
CL
r-+
3
fD
C:
Ln
fD
fD
rD
0
m
rD
(D
<
<
or
-f -
N
0
73
00
0
O'Q
rD
Ln
I
M
4F d
tx
CL
CL)
1�
r+
anv TEP. TV -i—1
3�F
H� �
'
✓y Aa
LL
_
i t
9.
ys S
kill
l
A.��r
I
t
F
F�
•.tip „�' '.:::::::::::
E
#
id�9eE
Ln 3
3 CD ' CD O �` ::o_ v' CL � rD o
mff3
�, :3o 0 �;
:;::o:
cu O 4q O O n-0 W
n 3 3 O v -�
3CL
aq • CSD N p �.;
rOD Q �• � p q fD O• rDLn 0 IAEA Ln:
aq U-1CD fD =
(D CL �, €
�g + Ln
0
•
cr
n
(D
�
tai•
(D
4
p
n
p
v
(D
(D
W--
r+
3
e -+r
-r
--h
0
p
p
aj
0
3
pg
�
o
.c
p
r+
r+
V
3
DCL
ao
rn
E
fD
n
.
0
w
cr
C w
W
tai•
(D
4
�
(D
r+
�C
e -+r
-r
--h
p
p
�
0
cu
pg
�
o
.c
p
r+
°
3
ao
rn
(D
.
•
Ln LA Ln
(D C x rDD
C CD � =3rD
t.+
73 r+ LA�. � o
O 0
--
fD fD �
x cl]
O � D °o
fa o r —
"� prq CD L.
w 3 e-+
CL rD
rD
W 70
`C O
o � _Q O n
fD Ln
L o
ifD �
ra 3
-� 3 s o
(D co o
O.
3 =
O o
O 0 •
r O
0
O rD
--% -0
O
O
rD
n �
X -n
C
m
a
C • --F�
cn CL
0 C
r+
rD m
p °+
p
L
EESE�r.
(E:Ef�Itw.�
Ef.<
i.. u.
�D
Q
CL
aq
m
O
fDO
AQrt-+
�"'
m
=$e-+�
Ln
r -F
3
o
Q
-1r0
Ln
3
Q
Q
o.
rD
Q
:3�,
'�
nQ
�.
-cr,
cm
=r,
ria
rn
CD�
1
�
f7
,C
O�
�
Q
n
Elf
14-
r*
L.
CD
Q
�D
Q
CL
aq
m
R ont'.
17n
m,
lb CITY OF RENTOA
DEPARTMENT OF COMMUNITY &ECONOMIC
DEVELOPMENT
MEMORANDUM
Date: September 26, 2016
To: City Clerk's Office
From: Sabrina Mirante
Subiect: Land Use File Closeout
Please complete the following information to facilitate project closeout and indexing by the City
Clerk's Office.
Project Name: The Pines Preliminary Plat
' LUA (file) Number: LUA16-000413, ECF, PP, MOD
Cross -References:
AKA's:
Project Manager. Matt Herrera
Acceptance Date: August 1, 2016
Applicant: Jamie Waltier, Harbour Homes
Owner: Beverly Stinde
Contact: Maher .loudi
PID Number: 0923059116, 0923059117
ERC Determination: DNS Date: August 29, 2016
3:
Appeal Period Ends: September 9 2016
Administrative Decision: Date:
Appeal Period Ends:
Public Hearing Date: September 27, 2016
Date Appealed to HEX:
By Whom:
HEX Decision: Date:
Appeal Period Ends:
Date Appealed to Council:
By Whom:
-
Council Decision:
Date_
Mylar Recording Number:
Project Description: The applicant is requesting Preliminary Plat approval and Environmental
Threshold Determination (SEPA) for a proposed 14 -lot subdivision. The project site is 108,029
square feet (2.48 acres) and located at 850 and $70 Monroe Avenue NE. The project site is located
in the Residential -8 (R-8) zoning designation. The proposed single-family residential lots range in
size from 5,001 square feet to 6,696 square feet with an overall proposed density of 7.18 dwellings
Per acre. Two existing single-family dwellings will be removed. Additional proposed improvements
include a tree retention tract and storm drainage tract along the Monroe Ave NE frontage. The
proposed lots will be served by a new public residential access street off of Monroe Avenue NE. A
Lhammerhead turnaround is proposed in lieu of the code required cul-de-sac and will require
approval of a modification of the City's street standards. Proposed lots will be served by sanitary
L0
and water mains that will extend from Monroe Avenue NE along the new street. Construction
of the proposed subdivision infrastructure improvements will result in approximately 1,226 cubic
ards of cut and 2,207 cubic yards of fill. l
Location:850 & 870 Mo
Ave NE
ERC Determination Types: DNS - Determination of Non -Significance; DNS -M - Determination of
Non -Significance -Mitigated; DS - Determination of Significance.
fr�
0
..ClT1r' OF, R1ENTON
DEPARTMENT QF�Co►MMUNIT.Y & ECONOMIC .DEVELOPMENT='VCANNIN.GDIV .l1SION"
AFFIDAVIT OF SERVICE BY MAILING
On the 20th day of September, 2016, 1 deposited in the mails of the United States, a sealed envelope
containing HEX Report and Exhibits documents. This information was sent to:
Phil Olbrechts Hearing Examiner
Beverly Stinde Owner
(Signature of Sender):
fl 17
STATE OF WASHINGTON ) "°UR�
% Q0 c
COUNTY OF KING�Y,
I certify that I know or have satisfactory evidence that Sabrina Mirante cif �>VA��>`'
signed this instrument and acknowledged it to be his/her/their free and voluntary act for the UAA'§*I purposes
mentioned in the instrument.
Dated: `r -127 ` mf In
Notary Public 014nd for the State of Washington
Notary (Print): 6&rjr-s- a_ Lie- r
My appointment expires: 4-1 q- 2-0 I$
rQq cfftmef'- Pl
The Pines Preliminary Plat
.__
E ro ebe
LUA16-000413, ECF, PP, MOD
template - affidavit of service by mailing
Beverly Stinde Beverly Stinde Beverly Stinde
19807 SE 300th St 19807 SE 300th St 19807 SE 300th St
Kent, WA 98042 Kent, WA 98042 Kent, WA 98042
Jamie Waltier Maher Joudi
Harbour Homes, LLC D.R. Strong Consulting Engineers
1441 N 34th St, 200 620 7th Ave
Seattle, WA 98103 Kirkland, WA 98033
Agencies
The Pines Preliminary Plat
See Attached
Jamie Waltier
Applicant
Maher.loudi
Contact
Beverly Stinde
Owner
ORA
(Signature of Sender):
y��5514iy `' r,4,3�f!
STATE OF WASHINGTON )-r'°IA
Sy * r
fR's
S
COUNTY OF KING A,n"C,
I certify that I know or have satisfactory evidence that Sabrina Mirante
signed this instrument and acknowledged it to be his/her/their free and voluntary act%MNAe5 and purposes
mentioned in the instrument.
Dated:
Notary Public and for the State of Washington
Notary (Print): t as t f 7 -
My appointment expires: far 19-tol 4
�e
The Pines Preliminary Plat
pJFF..' rnA^
LUA16 000413, ECF, PP, MOD
template - affidavit of service by mailing
0 0
AGENCY (DOE) LETTER MAILING
(ERC DETERMINATIONS)
Dept. of Ecology **
Dept. of Ecology **
Muckleshoot Indian Tribe Fisheries Dept. **
Environmental Review Section
Attn: Misty Blair
Attn: Karen Walter or SEPA Reviewer
PO Box 47703
PO Box 47703
39015 — 172"4 Avenue SE
Olympia, WA 98504-7703
Olympia, WA 98504-7703
Auburn, WA 98092
WSDOT Northwest Region *
Duwamish Tribal Office *
Muckleshoot Cultural Resources Program **
Attn: Ramin Pazooki
4717 W Marginal Way SW
Attn: Laura Murphy
King Area Dev, Serv., MS -240
Seattle, WA 98106-1514
39015 172nd Avenue SE
PO Box 330310
Auburn, WA 98092-9763
Seattle, WA 98133-9710
US Army Corp. of Engineers *
KC Wastewater Treatment Division *
Muckleshoot Cultural Resources Program **
Seattle District Office
Environmental Planning Supervisor
Attn: Erin Slaten
Attn: SEPA Reviewer
Ms. Shirley Marroquin
39015 172nd Avenue SE
PO Sox C-3755
201 S. Jackson ST, MS KSC-NR-050
Auburn, WA 98092-9763
Seattle, WA 98124
Seattle, WA 98104-3855
Boyd Powers ***
WDFW - Larry Fisher*
Office of Archaeology & Historic Preservation*
Depart. of Natural Resources
1775 12th Ave. NW Suite 201
Attn- Gretchen Kaehler
PO Box 47015
Issaquah, WA 98027
PO Box 48343
Olympia, WA 98504-7015
Olympia, WA 98504-8343
KC Dev. & Environmental Serv.
City of Newcastle
City of Kent
Attn: SEPA Section
Attn: Tim McHarg
Attn: Acting Community Dev. Director
35030 SE Douglas St. #210
Director of Community Development
220 Fourth Avenue South
Snoqualmie, WA 98065
12835 Newcastle Way, Ste 200
Kent, WA 98032-5895
Newcastle, WA 98056
Metro Transit
Puget Sound Energy
City of Tukwila
Senior Environmental Planner
Wendy Weiker, Community Svcs. Mgr.
Jack Pace, Responsible Official
Gary Kriedt
355 1101h Ave NE
6200 Southcenter Blvd.
201 South Jackson Street KSC-TR-0431
Mailstop EST 11W
Tukwila, WA 98188
Seattle, WA 98104-3856
Bellevue, WA 98004
Seattle Public Utilities
Puget Sound Energy
Jalaine Madura,
Doug Corbin, Municipal Liaison Mgr.
Attn: SEPA Responsible Official
6905 South 228th St
700 Fifth Avenue, Suite 4900
Kent, WA 98032
PO Box 34018
Seattle, WA 98124-4018
*Note: If the Notice of Application states that it is an "Optional DNS", the marked agencies and cities
will need to be sent a copy of the Environmental Checklist, Site Plan PMT, and the Notice of
Application.
**Department of Ecology is emailed a copy of the Environmental Checklist, Site Plan PMT, & Notice to
the following email address: sepaunit@ecy,wa,sov
** Karen Walter, Laura Murphy and Erin Slaten with the Muckleshoot Indian Tribe Fisheries Dept. are
emailed a copy of the Environmental Checklist, Site Plan PMT, & Notice to the following email
addresses: KWalter@muckleshoot.nsn.us Laura.murphyC@muckleshobt,nsn.us L
eri n.slaten @ muckles hoot. nsn. us
***Department of Natural Resources is emailed a copy of the Environmental Checklist, Site Plan PMT,
& Notice the following email address: se acenter dnr.wa. ov
template - affidavit of service by mailing
Beverly Stinde Beverly Stinde Beverly Stinde
19807 SE 300th St 19807 SE 300th St 19807 SE 300th St
Kent, WA 98042 Kent, WA 98042 Kent, WA 98042
Jamie Walder
Harbour Homes, LLC
1441 N 34th St, 200
Seattle, WA 98103
Maher Joudi
D.R. Strong Consulting Engineers
620 7th Ave
Kirkland, WA 98033
DEPARTMENT OF COMIVIIOITY CITY °F
AND ECONOMIC DEVELOPMENT
nto6i 0'
A. REPORT TO THE HEARING EXAMINER
HEARING DATE: September 27, 2016
Project Name: The Pines Preliminary Plat
Owner. Beverly Stinde, 850 Monroe Ave NE, Renton, WA 98056
Applicant/Contact: Jamie Waltier, Harbour Homes, LLC., 400 N. 34`h St., Ste. 300, Seattle, WA 98117
File Number: LUA16-000413,ECF,PP,MOD
Project Manager: Matthew Herrera, Senior Planner
Project Summary: Proposed subdivision of two (2) existing single-family lots into 14 single-family
residential lots and three (3) tracts. The project site is located within a Residential -8 (R-8)
zoning designation. Proposed lots range in size from 5,001 square feet to 5,201 square
feet that result in an overall net density of 7.65 dwelling units per acre. The proposed
lots will be accessed from a new public residential access street off Monroe Ave NE. Two
existing single-family homes and their associated improvements will be removed to
accommodate the proposed subdivision.
Project Location: 850 & 870 Monroe Ave NE, Renton, WA 98056
Site Area: 2.45 acres
Staff Staff recommends that the Hearing Examiner approve The Pines Preliminary Plat
Recommendation: subject to conditions recommended on page 19 of this report.
Project Location Map
HEXReportPinesPP
City of Renton Deportment of Comm& Economic Development ring Examiner Recommendation
THE PINES PRELIMINARY PLAT LUA 16-000413, ECF, PP, MOD
Report of September 20, 2016 Page 2 of 20
B. EXHIBITS:
Exhibits 1-18: Environmental Review Committee Report and Exhibits
Exhibit 19
Hearing Examiner Staff Recommendation (dated September 20, 2016)
Exhibit 20
Renton School District Capacity
Exhibit 21
Environmental Determination of Nonsignificance
Exhibit 22
Tree Retention Worksheet
Exhibit 23
Renton Fire Authority Hammerhead Approval/Sprinkler Requirement
Exhibit 24
Neighborhood Meeting Notes and Mailing
Exhibit 25
Concurrency Test
Exhibit 26
Affidavit of Posting and Mailing
C. GENERAL INFORMATION:
1.
owner(s) of Record:
Beverly Stinde, 850 Monroe Ave NE, Renton, WA 98056
2.
Zoning Classification:
Residential -8 (R-8)
3.
Comprehensive Plan
Land Use Designation: Residential Medium Density
4.
Existing Site Use:
Single-family Residential
S.
Critical Areas:
None
6.
Neighborhood Characteristics:
Residential Medium Density (RMD) Comprehensive Plan Land Use Designation;
a. North:
Residential -8 DU/AC (R-8) zone
Residential Medium Density (RMD) Comprehensive Plan Land Use Designation;
b. East:
Residential -8 DU/AC (R-8) zone
Residential Medium Density (RMD) Comprehensive Plan Land Use Designation;
c. South:
Residential -8 DU/AC (R-8) zone
Residential Medium Density (RMD) Comprehensive Plan Land Use Designation;
d. West:
Residential -8 DU/AC (R-8) zone
6.
Site Area:
107,157 sq.ft. (2.45 acres)
U. HISTORICAL/BACKGROUND:
Action
Land Use File No. Ordinance No. Date
Comprehensive Plan
N/A 5758 06/22/2015
Zoning
N/A 5758 06/22/2015
Smith Annexation
N/A 1475 03/25/1954
E. PUBLIC SERVICES.
1. Existing Utilities
a. Water: Water service is provided by the City of Renton. There is an existing 10 -inch water main in
Monroe Ave NE.
HEXReportPinesPP
City of Renton Department of Comm Economic Development
THE PINES PRELIMINARY PLAT
Report of September 20, 2016
ing Examiner Recommendation
LUA16-000413, ECF,PP, MOD
Page 3 of 20
b. Sewer: Sewer service is provided by the City of Renton. There is an existing 12 -inch gravity sewer
main in Monroe Ave NE.
c. Surface/Storm Water: The existing properties do not contain stormwater facilities. There is an
existing 24 -inch stormwater main in Monroe Ave NE.
2. Streets: The proposed development abuts Monroe Ave NE along the west property line. Monroe Ave
NE is classified as a Minor Arterial Road. Existing right-of-way (ROW) width is approximately 60 -feet.
3. Fire Protection: Renton Fire Authority (RFA)
F. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE:
1. Chapter 2 Land Use Districts
a. Section 4-2-020: Purpose and Intent of Zoning Districts
b. Section 4-2-070: Zoning Use Table— Uses Allowed in Zoning Designations
c. Section 4-2-11OA: Residential Development Standards for Residential Zoning Designations
d. Section 4-2-115: Residential Design and Open Space Standards
2. Chapter 4 City -Wide Property Development Standards
3. Chapter 6 Streets and Utility Standards
4. Chapter 7 Subdivision Regulations
a. Section 4-7-080: Detailed Procedures for Subdivision
b. Section 4-7-120: Compatibility with Existing Land Use and Plan — General Requirements and
Minimum Standards
c. Section 4-7-150: Streets — General Requirements and Minimum Standards
d. Section 4-7-160: Residential Blocks — General Requirements and Minimum Standards
e. Section 4-7-170: Residential Lots — General Requirements and Minimum Standards
S. Chapter 11 Definitions
G. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN.
1. Land Use Element
H. FINDINGS OF FACT (FOF):
1. The applicant is requesting a Preliminary Plat for the construction of 14 new single family lots and four
(4) tracts that will provide tree retention/protection, shared driveway access, landscaping, and
stormwater flow control/treatment.
2. The 2.45 -acre project site is located at 850 and 870 Monroe Ave NE and identified by the King County
Assessor's Office as 092305-9116 and -9117.
3. The project site contains two (2) single family residences with several outbuildings and landscaping.
4. The Planning Division of the City of Renton accepted the above master application for review on June 7,
2016 and determined the application complete on June 15, 2016. The project was placed on hold on
June 15, 2016 and taken off hold on August 1, 2016. The project complies with the 120 -day review
period.
S. The proposed development would result in a net density of 7.65 dwelling units per acre.
6. Access to the site would be provided via a new public residential street (Road A) off Monroe Ave NE.
HEXReportPinesPP
City of Renton Department of Comm
THE PINES PRELIMINARY PLA
Report of September 20, 2016
Economic Development
�ing Examiner Recommendation
L UA 16-000413, ECF, PP,MOD
Page 4 of 20
7. The property is located within the Residential Medium Density (RMD) Comprehensive Plan land use
designation.
8. The site is located within the Residential -8 (R-8) zoning classification.
9. There are approximately 57 trees located on site of which the applicant is proposing to retain a total of
9 trees.
10. The site is mapped with a moderate landslide hazard area in the central and western portion of the
subject property. Existing site topography is relatively flat with 10 -feet of relief over approximately 500 -
feet and geotechnical analysis prepared by the applicant (Exhibit 8) indicated no potential hazard on or
near the subject property.
11. Approximately 1,226 cubic yards of material would be cut on site and approximately 2,207 cubic yards
of fill is proposed to be brought into the site.
12. The applicant is proposing to begin construction in July 2017 and end in February 2018.
13. Staff received no public or agency comment letters.
14. The Renton School District has indicated that the district has the capacity to provide services to the
proposed development (Exhibit 20).
15. Pursuant to the City of Renton's Environmental Ordinance and SEPA (RCW 43.21C, 1971 as amended),
on August 29, 2016 the Environmental Review Committee issued a Determination of Non -Significance
(DNS) for The Pines Preliminary Plat (Exhibit 21). A 14 -day appeal period commenced on September 2,
2016 and ended on September 16, 2016. No appeals of the threshold determination were filed.
16. Representatives from various city departments have reviewed the application materials to identify and
address issues raised by the proposed development. These comments are contained in the official file,
and the essence of the comments has been incorporated into the appropriate sections of this report
and the Departmental Recommendation at the end of this report.
17. Comprehensive Plan Compliance: The site is designated Residential Medium Density (MD) on the City's
Comprehensive Plan Map. The purpose of the MD designation is to allow a variety of single-family and
multi -family development types, with continuity created through the application of design guidelines,
the organization of roadways, sidewalks, public spaces, and the placement of community gathering
places and civic amenities. The proposal is compliant with the following development standards if all
conditions of approval are met:
Compliance
Comprehensive Plan Analysis
Policy L-3: Encourage infill development of single-family units as a means to meet
growth targets and provide new housing.
Goal L -H: Plan for high-quality residential growth that supports transit by providing
urban densities, promotes efficient land utilization, promotes good health and physical
activity, builds social connections, and creates stable neighborhoods by incorporating
both built amenities and natural features.
Goal L -I: Utilize multiple strategies to accommodate residential growth, including:
• Development of new single-family neighborhoods on large tracts of land outside
the City Center,
• Infill development on vacant and underutilized land in established neighborhoods
and multi -family areas.
Goal L -BB: Maintain a high quality of life as Renton grows by ensuring that new
HEXReportPinesPP
City of Renton Department of Coma
THE PINES PRELIMINARY PLAT
Report of September 20, 2016
Economic Development
g Examiner Recommendation
L UA 16-000413, ECF, PP,MOD
Page 5 of 20
18. Zoning Development Standard Compliance: The site is classified Residential -8 (R-8) on the City's Zoning
Map. Development in the R-8 Zone is intended to create opportunities for new single family residential
neighborhoods and to facilitate high-quality infill development that promotes reinvestment in existing
single family neighborhoods. It is intended to accommodate uses that are compatible with and support
a high-quality residential environment and add to a sense of community. The proposal is compliant
with the following development standards if all conditions of approval are met:
Compliance
development is designed to be functional and attractive.
✓
Goal L -FF: Strengthen the visual identity of Renton and its Community Planning Areas
and neighborhoods through quality design and development.
✓
Policy L-49: Address privacy and quality of life for existing residents by considering
scale and context in infill project design.
V11
PolicyL-51: Respond to specific site conditions such as topography, natural features,
and solar access to encourage energy savings and recognize the unique features of the
site through the design of subdivisions and new buildings.
✓
Policy L-56: Preserve natural landforms, vegetation, distinctive stands of trees, natural
slopes, and scenic areas that contribute to the City's identity, preserve property values,
and visually define the community and neighborhoods.
18. Zoning Development Standard Compliance: The site is classified Residential -8 (R-8) on the City's Zoning
Map. Development in the R-8 Zone is intended to create opportunities for new single family residential
neighborhoods and to facilitate high-quality infill development that promotes reinvestment in existing
single family neighborhoods. It is intended to accommodate uses that are compatible with and support
a high-quality residential environment and add to a sense of community. The proposal is compliant
with the following development standards if all conditions of approval are met:
Compliance
R-8 Zone Develop Standards and Analysis
Density: The allowed density range in the R-8 zone is a minimum of 4.0 to a
maximum of 8.0 dwelling units per net acre. Net density is calculated after
the deduction of sensitive areas, areas intended for public right-of-way, and
private access easements.
✓
Staff Comment: The onsite deductions for public streets and access easements are
27,023 square feet. This deduction results in a 1.83 net acre site. Net density for the
14 -lot proposal is 7.65 dwelling units per acre (14 lots / 1.83 acres = 7.65 du/ac),
which falls within the permitted density range for the R-8 zone.
Lot Dimensions: The minimum lot size permitted in the R-8 zone is 5,000 sq. ft. A
minimum lot width of 50 feet is required (60 feet for corner lots) and a minimum lot
depth of 80 feet is required.
The following table identifies the proposed approximate dimensions for Lots 1-14
Proposed Lot
Lot Size (sq. ft.)
Lot Width (feet)
Lot Depth (feet)
Lot 1
5,001
61.14
81.79
Lot 2
5,001
61.14
81.79
Lot 3
5,001
61.14
81.79
Lot 4
5,001
61.14
81.79
Lot 5
5,201
56.24
81.79
Lot 6
5,201
56.24
81.79
Lot 7
5,000
62.28
81.82
Lot 8
5,002
60.00
81.82
HEXReportPinesPP
City of Renton Department of Comn
THE PINES PRELiMINARYPLAT
Report of September 20, 2016
Economic Development
Examiner Recommendation
Page 6 of 20
Lot 9
5,001
61.14
81.79
Lot 10
5,001
61.14
81.79
Lot 11
5,001
61.14
81.79
Lot 12
5,001
61.14
81.79
Lot 13
5,001
61.14
81.79
Lot 14
5,001
61.14
81.79
Staff Comment: All proposed lots within the proposed preliminary plat are interior
lots. As provided in the lot dimensions table above, oil lots meet the requirements for
minimum lot sire, width, and depth.
Setbacks: The required setbacks in the R-8 zone are as follows: front yard is 20 feet,
side yard is 5 feet, side yard along the street 15 feet, and the rear yard is 20 feet.
Compliant if Staff Comment: The minimum required setbacks ore shown for all lots with the
conditions of exception of the front yards of lots 5 and 6, which contain 15 foot front yard
approval are setbacks. The applicant is proposing to vary front yard setbacks to comply with
met Residential Design and Open Space Standards RMC 4-2-115E1. See FOF 19 for staff
recommended condition of opproval. Averaging front yard setbacks is permitted via
RMC 4-2-110D31.
Compliance
not yet
demonstrated
Building Standards: The R-8 zone has a maximum building coverage of 50% and a
maximum impervious surface coverage of 651. In the R-8 zone, a maximum building
height of 2 stories with a wall plate height of 24 feet is permitted. Roofs with a pitch
equal to or greater than 4:12 may project an additional six (6) vertical feet from the
maximum wall plate height. If the height of wall plates on a building are less than the
states maximum the roof may project higher to account for the difference, yet the
combined height of both features shall not exceed the combined maximums.
Common rooftop features, such as chimneys, may project an additional four (4)
vertical feet from the roof surface_ Non-exempt vertical projections (e.g., roofs
pitched less than 4:12, decks, railings, etc.) may extend up to six (6) vertical feet
above the maximum wail plate height if the projection is stepped back one -and -a -
half (1.5) horizontal feet from each minimum building setback line for each one (1)
vertical foot above the maximum wall plate height.
Wall plates supporting a primary roof surface that has only one (1) sloping plane
(e.g., shed roof) may exceed the stated maximum if the average of wall plate heights
is equal or less than the maximum wall plate height allowed,
Stoff Comment: Building height, building coverage, and impervious surface coverage
for the new single family residences would be verified at the time of building permit
review.
Landscaping: The City's landscape regulations (RMC 4-4-070) require a 10 -foot
landscape strip along all public street frontages. Additional minimum planting strip
rconditions
widths between the curb and sidewalk are established according to the street
development standards of RMC 4-6-060. Street trees and, at a minimum,
groundcover, are to be located in this area when present. Spacing standards shall be
as stipulated by the Department of Community and Economic Development,
provided there shall be a minimum of one street tree planted per address. Any
additional undeveloped right-of-way areas shall be landscaped unless otherwise
determined by the Administrator. Where there is insufficient right-of-way space or
HEXReportPinesPP
City of menton Department of Coma
THE PINES PRELIMINARY PLAT
Report of September 20, 2016
Economic Development
�ing Examiner Recommendation
L UA 16-000413, ECF, PP,M00
Page 7 of 20
no public frontage, street trees are required in the front yard subject to approval of
the Administrator. A minimum of two trees are to be located in the front yard prior
to final inspection for the new Single Family Residence.
Staff Comment, The applicant's proposed landscape plan (Exhibit 16) includes an 8 -
foot wide planting strip, a 5 -foot wide sidewalk and a 0.5 foot wide curb. A final
detailed landscape plan must be submitted and approved prior to issuance of the
street and utility construction permits.
The landscape plan proposes 56 new trees including various maple, flowering pear
and cherry, and western red cedar. Deciduous trees are to be planted with 1.5 -inch
caliper and the western red cedar will have a minimum height of 6 -feet at time of
planting.
The applicant is proposing a 1,020 square foot landscape tract at the dead end of the
new residential street. The tract will include trees, shrubs, groundcover, and mulch.
All proposed vegetation within the tract is identified as drought tolerant in the
landscaping plan plant schedule.
Additional trees, shrubs, and groundcover are proposed to augment the Tree
Retention Tract A and eastern perimeter planting within Stormwater Tract D. All
proposed vegetation within these tracts has also been identified as drought tolerant.
No vegetation other than lawn is shown for the remainder of Tract D. Therefore, as a
condition of approval, a final landscaping plan shall be submitted that provides a
landscaping strip 15 feet in width surrounding the drainage tract as required by RMC
4-4-070H6. Additionally, during the required neighborhood meeting (Exhibit 24) there
was concern regarding children playing within the tract abutting Monroe Ave NE
without a barrier. Therefore, stoff recommends as a condition of approval, a final
landscaping plan shall be submitted that provides a berm at least three (3) feet in
height along the Monroe Ave NE frontage to provide a physical barrier in addition to
the landscaping noted above.
The ownership and maintenance of the landscaping within the tracts will be shared
equally with all property owners within the subdivision. Therefore, as ❑ condition of
approval, the applicant shall create a Home Owners Association ("HOA") that
provides maintenance and ownership responsibility for the landscaping within Tracts
A, C, & D. A draft HOA document has been submitted as part of the application. A
final HOA document shall be submitted to, and approved by, the City of Renton
Current Planning Project Manager and the City Attorney prior to Final Plat recording.
Such documents shall be recorded concurrently with the Final Plot.
Tree Retention: The City's adopted Tree Retention and Land Clearing Regulations
require the retention of 30 percent of trees in a residential development.
Significant trees shall be retained in the following priority order:
Priority One: Landmark trees; significant trees that form a continuous canopy;
Compliant if significant trees on slopes greater than twenty percent (20%); Significant trees
condition of adjacent to critical areas and their associated buffers; and Significant trees over sixty
approval is met feet (60') in height or greater than eighteen inches ( 18") caliper.
Priority Two: Healthy tree groupings whose associated undergrowth can be
preserved; other significant native evergreen or deciduous trees; and Other
significant non- native trees.
Prioritv Three: Alders and cottonwoods shall be retained when all other trees have
HEXReportPinesPP
City of Renton Department of Commur Economic Development
THE PINES PRELIMINARY PLA' OF
Report of September 20, 2016
ing Examin e r Reco m m endo tio n
L UA16-000413, ECF, PP,MDA
Page 8 of 20
been evaluated for retention and are not able to be retained, unless the alders and/
or cottonwoods are used as part of an approved enhancement project within a
critical area or its buffer.
A minimum tree density shall be maintained on each residentially zoned lot. For
detached single family development, the minimum tree density is two (2) significant
trees for every five thousand (5,000) square feet. The tree density may consist of
existing trees, replacement trees, trees required pursuant to RMC 4-4-07OF1, Street
Frontage Landscaping Required, or a combination.
Staff Comment: The applicant submitted a Tree Retention Worksheet (Exhibit 23),
Arborist report (Exhibit 12) and Tree Cutting and Land Clearing Plan (Exhibit 11) with
the project application. Each of these documents identifies 57 trees on the subject
property. Of these 57 trees, 15 are located within the proposed new residential street
right-of-way or within the right-of-way frontage improvements that will be provided
along Monroe Ave NE. The arborist report has also identified 17 trees that are non-
viable or otherwise dead, diseased, or dying. This results in 25 significant trees
subject to the 30 percent retention standard.
The applicant's Tree Cutting and Land Clearing Plan proposes to retain a total of 9
significant trees or 36 percent of the subject property's significant trees. A Tree
Retention Tract (Tract A) is proposed along the Monroe Ave NE frontage that will
contain eight (8) trees and proposed lot 5 will retain one (1) tree along its northern
boundary.
The Tree Cutting and Land Clearing Plan and Conceptual Road and Grading Plan
(Exhibit 4) shows grading work within the drip line of offsite trees abutting the
subject property, which does not comply with protection measures during
construction set forth in RMC 4-4-13OH9a. Therefore, as a condition of approval, the
applicant shall revise the Conceptual Road and Grading Plan to include the tree
protection measures for offsite trees pursuant to RMC4-4-13OH9.
The Landscape Plan (Exhibit 16) identifies two new trees for each proposed lot to
comply with minimum tree density standards.
The Landscape Plan does not identify the required measures for protection of the
trees within the Tree Protection Tract as identified in RMC 4-4-13OH2. Therefore, as a
condition of approval, the applicant shall provide a final landscaping plan that
provides details of split -roil fencing around the tract and signage identifying the tract
as tree protection.
The applicant is required to provide language in the HOA documents for shared
ownership of Tract A with shared responsibility for maintaining and protecting the
trees within the tract.
The applicant shall provide a note on the face of the final plat and record a covenant
concurrently with the final plat with all lots within the subdivision the following_
"MAINTENANCE RESPONSIBILITY: All owners of lots created by or benefiting from this
City action are responsible for maintenance and protection of the tree protection
tract. Maintenance includes ensuring that no alterations occur within the tract and
that all vegetation remains undisturbed unless the express written authorization of
the City has been received."
V11 Parking: Parking regulations require that a minimum of two parking spaces be
provided for each detached dwelling.
HEXReportPinesPP
City of Renton Department of Comm
THE PINES PRELIMINARY PLAT 4
Report of September 20, 2016
Economic Development
ing Examiner Recommendation
I LUA16-000413,ECF,PP,MOD
Page 9 of 20
Driveway cuts are required to be a minimum of 5 feet from property lines and new
driveways may be a maximum of 16 feet in width at the property line. Maximum
driveway slopes shall not exceed fifteen percent (15%); provided, that driveways
exceeding eight percent (8%) shall provide slotted drains at the lower end with
positive drainage discharge to restrict runoff from entering the garage/residence or
crossing any public sidewalk.
Staff Comment: Sufficient area exists on each lot to accommodate off-street parking
for a minimum of two (2) vehicles. This is typically achieved by providing o two (2) car
garage for each single family home. Compliance with individual driveway
requirements would be reviewed at the time of building permit review.
19. Design Standards: Residential Design and Open Space Standards (RMC 4-2-115) are applicable in the R-
S zone. The Standards implement policies established in the Land Use Element of the Comprehensive
Plan. Compliance with Site Design Standards must be demonstrated prior to approval of the
subdivision. Compliance with Residential Design Standards would be verified prior to issuance of the
building permit for the new single family homes. The proposal is consistent with the following design
standards, unless noted otherwise:
HEXReportPinesPP
Lot Configuration: One of the following is required:
1. Lot width variation of 10 feet (10') minimum of one per four (4) abutting
street -fronting lots, or
2. Minimum of four (4) lot sizes (minimum of four hundred (400) gross
square feet size difference), or
3. A front yard setback variation of at least five feet (5') minimum for at
Compliant if
least every four (4) abutting street fronting lots.
condition of
approval is
Staff Comment: The applicant has proposed to implement option #3. Lots 5 and 6
met
contain front yard setbacks of 15 feet. Lots 7 and 8 contain front yard setback of 25 -
feet. The option requires the variation to occur for at least one (1) lot for every hour
(4) abutting street fronting lots. Lots 1-4 and 10-14 do not contain any variation and
therefore do not meet the every four (4) abutting requirement. Therefore, as o
condition of approval, the applicant shall revise the Preliminary Plat (Exhibit 2) to
provide a front yard setback variation for at least one (1) lot for every four (4)
abutting street fronting lots and the setbacks shall be provided on the face of the
plot.
Garages: One of the following is required; the garage is:
1. Recessed from the front of the house and/or front porch at least eight
feet (8'), or
2. 21ocated so that the roof extends at least five feet (5') (not including
eaves) beyond the front of the garage for at least the width of the garage
Compliance
plus the porch/stoop area, or
not yet
demonstrated
I Alley accessed, or
4. Located so that the entry does not face a public and/or private street or
an access easement, or
5. Sized so that it represents no greater than fifty percent (50%) of the
width of the front facade at ground level, or
6. Detached.
HEXReportPinesPP
City of Renton Department of Camm Economic Development
THE PINES PRELIMINARY PLAT
Report of September 20, 2016
g Examiner Recommendation
LUA1
, ECF, PP,MOD
Page 10 of 20
HEXReportPinesPP
The portion of the garage wider than twenty six -feet (26') across the front shall be
set back at least two feet (2').
Staff Comment: Compliance for this standard would be verified at the time of
building permit review.
Primary Entry: One of the following is required:
1. Stoop: minimum size four feet by six feet (4'x 6') and minimum height
twelve inches (12") above grade, or
Compliance
2. Porch: minimum size five feet (5') deep and minimum height twelve
not yet
inches (12") above grade.
demonstrated
Exception: in cases where accessibility (ADA) is a priority, an accessible route may be
taken from a front driveway.
Staff Comment: Compliance for this standard would be verified at the time of building
permit review.
Facade Modulation: One of the following is required:
1. An offset of at least one story that is at least ten feet (14') wide and two
Compliance
feet (2') in depth on facades visible from the street, or
not yet
2. At least two feet (2') offset of second story from first story on one street
demonstrated
facing facade.
Staff Comment: Compliance for this standard would be verified at the time of building
permit review.
Compliance
Windows and Doors: Windows and doors shall constitute twenty-five percent (25%)
not yet
of all facades facing street frontage or public spaces.
demonstrated
Staff Comment: Compliance far this standard would be verified at the time of building
permit review.
N/A
Scale, Bulk, and Character: N/A
Roofs: One of the following is required for all development:
1. Hip or gabled with at least a six to twelve (6:12) pitch for the prominent
form of the roof (dormers, etc., may have lesser pitch), or
Compliance
not yet
2. Shed roof.
demonstrated
Additionally, for subdivisions greater than nine (9) lots: A variety of roof forms
appropriate to the style of the home shall be used.
Staff Comment: Compliance for this standard would be verified at the time of building
permit review.
Eaves: Both of the following are required:
1. Eaves projecting from the roof of the entire building at least twelve
Compliance
inches (12") with horizontal fascia or fascia gutter at least five inches (5")
not yet
deep on the face of all eaves, and
demonstrated
2. Rakes on gable ends must extend a minimum of two inches (2") from the
surface of exterior siding materials.
Staff Comment: Compliance for this standard would be verified at the time of building
permit review.
Compliance
Architectural Detailing: If one siding material is used on any side of the dwelling that
not yet
is two stories or greater in height, a horizontal band that measures at least eight
HEXReportPinesPP
City of Renton Department of Comr
THE PINES PRELIMINARY PLAT
Report of September 20, 2016
Economic Development
� Examiner Recommendation
LUA16-000413, ECF, PP,M00
Page 11 of 20
demonstrated
inches (8") is required between the first and second story.
Additionally, one of the following is required:
rCompillance
1. Three and one half inch (3 1/2") minimum trim surrounds all windows
and details all doors, or
2. A combination of shutters and three and one half inches (3 1/2")
minimum trim details all windows, and three and one half inches (3 1/2")
minimum trim details all doors.
Staff Comment: Compliance for this standard would be verified at the time of building
permit review.
Materials and Color: For subdivisions and short plats, abutting homes shall be of
differing color. Color palettes for all new dwellings, coded to the home elevations,
shall be submitted for approval.
Additionally, one of the following is required:
1. A minimum of two (2) colors is used on the home (body with different
color trim is acceptable), or
Compliant if
2 A minimum of two (2) differing siding materials (horizontal siding and
condition of
shingles, siding and masonry or masonry -like material, etc.) is used on
approval is
the home. One alternative siding material must comprise a minimum of
met
thirty percent (30%) of the street facing facade. If masonry siding is used,
it shall wrap the corners no less than twenty four inches (24").
Staff Comment: For staff to determine if abutting homes within the subdivision are
different colors prior to individual building permit applications for each lot, staff
recommends as a condition of approval that a plot layout color palette for each new
single family home be submitted to the Current Planning Project Manager for review
and approval prior to plat recording.
20. Modification Analysis: The applicant is requesting the following modifications from RMC 4-6-060:
• Modification Request 1: RMC 4-6-060.F.2: Reduction in pavement width on Monroe Avenue NE
(minor arterial) from 54 -feet to approximately 44 -feet and a reduction in sidewalk width from
8 -feet to 5 -feet.
• Modification Request 2: RMC 4-6-060.13.2: Allow hammerhead turnaround, in lieu of a cul-de-
sac, on a dead end street that is greater than 300 feet in length (Road A).
• Modification Request 3: RMC 4-6-06011: Allow the use of a shared driveway in a subdivision
with ten (10) or more lots.
The proposal is compliant with the following modification criteria, pursuant to RMC 4-9-250, if all
conditions of approval are met. Therefore, staff is recommending approval of the three (3) requested
modifications, subject to conditions as noted below:
HEXReportPinesPP
Modification Criteria and Analysis
a. Substantially implements the policy direction of the policies and objectives of the
rCompillance
Comprehensive Plan Land Use Element and the Community Design Element and the
proposed modification is the minimum adjustment necessary to implement these
policies and objectives.
StaffComment:
Modification Request 1 Monroe Ave NE: The Land Use Element has applicable policies
HEXReportPinesPP
City of Renton Department of C
THE PINES PRELIMINARY PLA T
Economic Development
in Examiner Recommendation
L UA16-000413, ECF, PP,MQD
Report of September 20, 2016 Page 12 of 20
listed under a separate section labeled Promoting a Safe, Healthy, and Attractive
Community. These policies address walkable neighborhoods, safety and shared uses.
The intent of the policies is to promote new development with walkable places that
support grid and flexible grid street and pathway patterns, and are visually attractive,
safe, and healthy environments. The requested street modification is consistent with
these policy guidelines.
Modification Request 2 Road A: The Land Use Element provides policies to support
compact urban development maximize land use efficiency, and encourage infill
development of single-family units. The requested hammerhead road modification
provides more developable area for the subject property as the required cul-de-sac
turnaround is more than 50 -percent of the subject property's total width. The
modification would allow the proposal to achieve a density near eight (8) dwelling units
per net acre, which is consistent with the Renton Land Use Plan's Residential Medium
Density and Residential -8 Zone. The requested hammerhead turnaround modification is
consistent with these policy guidelines.
Modification Request 3 Shared Driveway: The Land Use Element contains goals and
policies for functional and attractive development, promotion of active transportation,
and creating a variety of single-family development types. The shared driveway
modification would provide two (2) of the subdivision's ability to incorporate side access
to the lots. This option allows for homes along the street to emphasize porches,
windows, and other architectural features instead of garages. Additionally, the shared
driveway would result in the reduction of curb cuts along the new residential street,
which reduces pedestrian vehicle conflicts. The requested street modification is
consistent with these policy guidelines.
b. Will meet the objectives and safety, function, appearance, environmental
protection and maintainability intended by the Code requirements, based upon
sound engineering judgment.
Staff Comment,
Modification Request 1 Monroe Ave NE: Monroe Avenue NE is a minor arterial street
with an existing right of way width of 60 feet. RMC 4-6-060.F.2 requires that the
Monroe Avenue NE have 27 feet of pavement from the centerline (two 11 foot travel
lanes and a 5 -foot bike lane), 0.5 foot curb/gutter, 8 -foot planter strip, 8 -foot wide
sidewalk, and a 2 -foot clear width from back of sidewalk to the right of way.
Compliant if The City's Public Works Transportation Division and Community and Economic
Conditions Development Engineering Division reviewed Monroe Avenue NE along with the
of Approval surrounding area and recommend that the existing curb line remain in place to maintain
are Met the appearance and functionality of this dedicated bike route. A modified Minor
Arterial street (as recommended for approval) will require 22 feet of pavement from the
centerline (half of a 12 foot turn lane, 11 foot travel lane, and a 5 -foot bike lane), 0.5 -
foot curb/gutter, 8 -foot planter strip, and a 5 -foot wide sidewalk. The existing curb and
gutter is approximately 22 feet from the existing right of way which will require a right-
of-way dedication of 5.7 feet. Therefore, as a condition of approval, a revised paving
plan identifying this street section shall be submitted to and approved by the Plan
Reviewer prior to construction permit approval.
Modification Request 2 Road A: Road A is a residential street that is approximately 490 -
feet long (or 375 feet from to the center of the turnaround), as measured from the
existing curb line of Monroe Avenue NE to the east terminus of Road A. RMC 4-6-
HEXReportPinesPP
City of Renton Department of Comm Economic Development
THE PINES PRELIMINARYPLA T
Report of September 20, 2016
Oring Examiner Recommendation
LUA1 6-000413,ECF,PP,MOU
Page 13 of 20
050.H.2 requires that roadways greater than 300 feet are required to provide a cul-de-
sac. A cul-de-sac turnaround with a required right of way diameter of 110 feet would
be more than fifty percent of the total property width (property width is 216 feet)
significantly reducing the viability of the property. The City's Community and Economic
Development Engineering Division and the Renton Fire Authority (Exhibit 23) have
reviewed the project and recommend approval of the modification to allow a
hammerhead turnaround be utilized for Road A. Staff recommends, as a condition of
approval, concurrence of the Renton Fire Authority condition of allowing a hammerhead
turnaround with the requirement that all future homes be required to have an approved
residential fire sprinkler system thereby providing the needed fire protection while
maintaining project viability and density.
Modification Request 3 Shared Driveway: The shared driveway for lots 5 and 6 is
proposed as on alternative to the preferred alley access street pattern within the R-8
zone. RMC 4-6-060.1.1 notes that shared driveways may only be used within plats of
four or less lots. The location and orientation of the proposed shared driveway off of
the north end of the hammerhead turnaround can function similar to an alley as it is
able to provide side access to the lots. The shared driveway provides a pedestrian safety
benefit as lots 5 and 6 will not have curb cuts for their individual driveways along the
residential street. Fewer driveways along the sidewalk results in fewer opportunities for
pedestrian vehicle conflicts. The width of the subject property limits the use of on alley
configuration and therefore staff recommends approval of the shored driveway
concurrent with the hammerhead turnaround with a condition of approval that the
front of the future homes on lots 5 and 6 be oriented to the new residential street with
garages located an the side or rear of the homes and access to lots 5 and 6 is limited to
the shared driveway.
If all conditions of approval are met staff for the three (3) proposed modifications, staff
concurs the proposed modifications would meet the objectives of function and
maintainability intended by the code requirements.
c. Will not be injurious to other property(ies) in the vicinity.
Staff Comment:
Modification Request 1 Monroe Ave NE: Should the requested modification be
approved, it would not be injurious to other properties within the vicinity of the subject
site. Monroe Avenue iVE would maintain the existing curb and gutter and provide
✓ increased pedestrian safety by adding a sidewolk along the property frontage.
Modification Request 2 Road A: The hammerhead turnaround will not be injurious to
other properties in the vicinity as it is internal to the proposed property.
Modification Request 3 Shared Driveway: The shored driveway modification is an
internal aspect of the proposed subdivision affecting two (2) lots and therefore will not
be injurious to other properties in the vicinity.
d. Conforms to the intent and purpose of the Code.
Staff Comment:
✓ Modification Request 1 Monroe Ave NE: The intent and purpose of the code is met as
the modified street section would provide newly constructed street frontage
improvements while providing continuity to the surrounding transportation system.
Modification Request 2 Road A: The intent and purpose of the code is met as the
HEXReportPinesPP
City of Renton Department of Comm Economic [Development
THE PINES PRELIMINARY PLAT
Report of September 20, 2016
�ing Examiner Recommendation
L UA 16-000413, ECF, PP, MOD
Page 14 of 20
21. Compliance with Subdivision Regulations: RMC 4-7 Provides review criteria for the subdivisions. The
proposal is consistent with the following subdivision regulations if all conditions of approval are
complied with:
Compliance
hammerhead turnaround (as conditioned) would provide adequate emergency access
and allow for the appropriate level of residential density to be achieved.
Modification Request 3 Shared Driveway: The intent and purpose of the code is met as
the shared driveway would provide two (2) of the proposed lots the ability to utilize side
vehicle access and mimic an alley load. Alley access is the preferred street pattern for
the R-8 zone.
e. Can be shown to be justified and required for the use and situation intended; and
Staff comment:
Modification Request 1 Monroe Ave NE: The modification is justified and required as
,/
maintaining the existing curb line provides functionality and appearance of the
dedicated bike route.
r
Modification Request 2 Road A: The modification is justified and required for the use as
the hammerhead turnaround (as conditioned) provides the developable area needed to
achieve density standards.
Modification Request 3 Shared Driveway: The modification is justified and required for
use as it provides the ability to utilize side vehicle loading for two (2) lots within a
subdivision that is not conducive to alley street pattern due to size.
f. Will not create adverse impacts to other property(ies) in the vicinity.
Staff Comment:
Modification Request 1 Monroe Ave NE: Should the requested modification be
approved, it would not create adverse impacts to other properties within the vicinity.
Monroe Avenue NE would maintain the existing curb and gutter and provide increased
pedestrian safety by adding a sidewalk along the property frontage.
Modification Re nest 2 Road A: The hammerhead turnaround will not create adverse
impacts to other properties in the vicinity as it is internal to the proposed subject
property.
Modification Request 3 Shared Driveway: The shored driveway modification is an
internal aspect of the proposed subdivision affecting two (2) lots and therefore will not
create adverse impacts to other properties in the vicinity.
21. Compliance with Subdivision Regulations: RMC 4-7 Provides review criteria for the subdivisions. The
proposal is consistent with the following subdivision regulations if all conditions of approval are
complied with:
Compliance
Subdivision Regulations and Analysis
Access: Each lot must have access to a public street or road_ Access may be by a shared
driveway per the requirements of the street standards.
The maximum width of single loaded garage driveways shall not exceed nine feet (9')
,/
and double loaded garage driveways shall not exceed sixteen feet (16').
Staff Comment: With the exception of lots 5 and 6, all lots would have access to a public
street. Lots 5 and 6 would gain access to the public street via a shared driveway per
Modification Request 3 referenced in FDF 20. Alley access is the preferred street pattern
for all new residential development outside the Residential Low Density land use
HEXReportPinesPP
City of Renton Department of Comm Economic Development
THE PINES PRELIMINARY PLAT
Report of September 20, 2016
ring Examiner Recommendation
+ LUA16-000413,ECF,PP,MOD
Page 15 of 20
designation. The width of the proposed subdivision is not conducive to alley access far
all lots. The proposed shored driveway extending from the hammerhead turnaround
mimics alley access for lots 5 and 6. Compliance with individual driveway requirements
would be reviewed at the time of building permit review.
Blocks: Blocks shall be deep enough to allow two tiers of lots.
StaffComment: The width of the subject property limits the ability to meet this
,i requirement in its entirety. The proposed lots north of the new Road A and existing
abutting northern properties will result in a two tier lot block. Proposed lots south of the
new Road A will not have sufficient width for another two black tier without the
redevelopment of abutting properties.
Lots: The size, shape, orientation, and arrangement of the proposed lots comply with
the requirements of the Subdivision Regulations and the Development Standards of the
R-8 zone and allow for reasonable infill of developable land. All of the proposed lots
meet the requirements for minimum lot size, depth, and width. Width between side lot
lines at their foremost points (i.e., the points where the side lot lines intersect with the
street right-of-way line) shall not be less than eighty percent (80%) of the required lot
Compliant if
condition of width except in the cases of (1) pipestem lots, which shall have a minimum width of
approval is twenty feet (20') and (2) lots on a street curve or the turning circle of cul-de-sac (radial
met lots), which shall be a minimum of thirty five feet (35').
Staff Comment: Lots are rectangular in shape and comply with size and dimensional
requirements. With the condition of approval that lots 5 and 6 provide side or rear
loading (see Modification 3 FDF 20), all lots within the proposed subdivision will be
oriented to the new residential street. Proposed lot 7 contains 44 feet of frontage width
and proposed lot 8 contains 40 feet of frontage. Both frontages are at least SO percent
of their required 50 foot lot width.
Streets: The proposed street system shall extend and create connections between
existing streets per the Street Standards outlined in RMC 4-6-060 Street Standards.
Stoff Comment: Primary access to the site would be provided via a new public
residential access street from Monroe Ave NE. Frontage improvements along Monroe
Ave NW, a minor arterial, would be provided in a modified condition as referenced in
FOF 20 Modification Request 1, which includes a pavement width of 22 feet, 8 foot
planting strips, 5 foot sidewalks, and 0.5 foot curb. This modified street section would
require 5.7 feet of right-of-way dedication. The Generalized Utilities Plan (Exhibit 6)
identities four (4) pedestrian ramps along Monroe Ave NE facing west into the vehicle
travel lane with no marked pedestrian crossing. Therefore, os a condition of approval,
the applicant shall revise the all plan sheets to remove these pedestrian ramps.
Road A is a proposed residential public street with 26 feet of pavement width and
gutter, 0.5 foot curb, 8 -foot planter, and 5 -foot sidewalk on both sides within a 53 foot
right of way. Pavement width allows for parking on one side with the exception of any
area needed for the Fire Department turnaround needs.
The applicant has proposed modifications to the residential street that would allow a
hammerhead turnaround as an alternative to the code required cut -de -sac for dead end
streets 300 to 50D feet in length. Staff supports this modification as provided in FOF 20
Street Modification Request 2 with the Fire Department's condition that fire sprinklers
be provided in all homes within the proposed subdivision.
The third modification to allow a shared driveway to extend from the hammerhead
turnaround is also supported by staff as provided in FOF 20 Street Modification Request
HEXReportPinesPP
City of Renton Department of Comm Economic Development
THE PINES PRELIMINARY PLAT
Report of September 20, 2016
f Examiner Recommendation
LUA16-000413, ECF, PP, MOO
Page 16 of 20
22. Availability and Impact on Public Services:
3. This modification allows two of the lots to be side or rear loaded, which is the
FCompfliance
preferred vehicular access option for R-8 zoned properties and reduces the amount of
curb -cuts along proposed Road A.
The applicant has submitted a Vehicle Trip Memorandum (Exhibit 17) that indicates the
proposed 14 -lot subdivision would generate 114 new trips per weekday, with 9 of those
trips generated during the AM peak hour (2 in, 7 out) and 12 during the PM peak hour
(8 in, 4 out). The project has passed the City of Renton Troffic Concurrency Test (Exhibit
25). No sight distance limitations have been identified at the intersection of proposed
Road A and Monroe Ave NE
it is not anticipated that the proposed project would adversely impact the City of
Renton's street system subject to the payment of code -required impact fees and the
,i
construction of code -required frontage improvements. The fee, as determined by the
Renton Municipal Code at the time of building permit issuance shall be payable to the
City.
Street lighting is required per RMC 4-6-0601. All street lighting would be required to
meet current city standards. Lighting plans were not submitted with the land use
application and would be reviewed during the construction utility permit. A lighting plan
shall be submitted to, and approved by, the Current Planning Project Manager and the
Plan Reviewer prior to construction permit approval.
Relationship to Existing Uses: The proposed project is compatible with existing
surrounding uses.
Staff Comment: The subject property is bordered by singfe family homes around all
sides of the property. The properties surrounding the subject site are residential medium
density and are designated R-8 on the City's zoning map. The proposal is similar to
existing development patterns in the area and is consistent with the Comprehensive
Plan and Zoning Code, which encourage residential infill development.
22. Availability and Impact on Public Services:
HEKReportPinesPP
Availability and Impact on Public Services Analysis
FCompfliance
Police and Fire: Police and Fire Prevention staff indicates that sufficient resources exist
to furnish services to the proposed development; subject to the condition that the
applicant provides Code required improvements and fees. Fire impact fees are
applicable at the rate of $495.10 per single family unit. This fee is paid at time of
building permit issuance.
Schools: It is anticipated that the Renton School District can accommodate any
additional students generated by this proposal at the following schools: Highlands
Elementary, Dimmitt Middle School and Renton High School. Any new students from
the proposed development would be bussed to middle and high schools. The stops are
located at Monroe Ave NE and NE6th Pl. and Olympia Ave NE and NE 101h Lane,
,i
respectively. Students are within walking distance of Highlands Elementary. The
proposed project includes the installation of frontage improvements along the Monroe
Ave NE frontage, including sidewalks. Students would walk south on the west side of
Monroe Ave NE to NE 7th St. and proceed west to Harrington Ave NE and then proceed
north to Highlands Elementary. There are existing sidewalks on at least one side of each
walking route with the exception of the Renton High School bus stop stretch along
Olympia Ave NE between NE 10th St. and NE 10th Ln. which is classified as a residential
HEKReportPinesPP
City of Renton Department of Comn
THE PINES PRELIMINARY PLAT I
Report of September 20, 2016
HEXReportPlnesPP
Economic Development
Examiner Recommendation
L UA16-000413, ECF, PP, MOD
Page 17 of 20
access street containing an approximate 18 -foot shoulder with typical residential lawns.
Therefore, there are safe walking routes to Highlands Elementary and the school bus
stops.
A School Impact Fee, based on new single-family lots, will be required in order to
mitigate the proposal's potential impacts to the Renton School District. The fee is
payable to the City as specified by the Renton Municipal Code. Currently the fee is
assessed at $5,643.00 per single family residence.
Parks: A Park Impact Fee would be required for the future houses. The current Park
Impact Fee is $1,887.94. The fee in effect at the time of building permit application is
applicable to this project and is payable at the time of building permit issuance.
Storm Water: An adequate drainage system shall be provided for the proper drainage
of all surface water.
Staff Comment: The existing properties do not contain storm water facilities. There is an
existing 24 -inch stormwater main located in Monroe Ave NE. Based on the city's flow
control mop, the subject property is within the Peak Rate Flow Control Standard area
matching Existing Site Conditions and is within the East Lake Washington Drainage
Basin.
The applicant submitted a Preliminary Technical Information Report (TIR) (Exhibit 10)
and Drainage Control Plan (Exhibit 9). The TIR indicates the project is required to
provide Level 2 Flow Control and Basic Water Quality Treatment. The development is
subject to Full Drainage Review in accordance with the 2009 King County Surface Water
Design Manual (KCSWDM) and the City of Renton Amendments to the KCSWDM. All
core and special requirements have been discussed in the TIR.
Stormwater improvements proposed to accommodate the new development will consist
of a detention vault to provide flow control for the new and replaced impervious
surfaces with a wetvault component that will provide the required Basic Water Quality.
The vault shall be designed in accordance with the KCSWDM and the City of Renton
Amendments to the manuol. Separate structural plans will be required to be submitted
for review and approval under a separate building permit for the detention and water
quality vault. Special inspection from the building department is required.
The TIR downstream analysis provided information along two different downstream
paths. The analysis did not indicate any existing or potential drainage problems on
either path.
The geotechnical study indicated the site's Vashon glacial till soil is not an ideal geologic
feature to accommodate infiltration. Infiltration capacity is considered extremely
minimal. The geotechnical study also provided vault design recommendations, which
should be supported on competent native soil or crushed rock placed atop competent
native soil.
The sizing and design of the proposed flow control facilities would be reviewed for
compliance with the adopted 2009 King County Surface Water Design Manual and City
of Renton amendments with the utility permit.
Water: The subject property is within the City of Renton's water service area in the
Highlands 565 hydraulic zone. There is an existing 10 -inch water main in Monroe Ave NE
that can deliver 3,800 gpm. The static water pressure is approximately 75 psi at the
390 foot ground elevation.
The proposed water main improvements as shown in the Generalized Utility Plan
(Exhibit 6) and Road Profile and Details (Exhibit 5) provide a conceptual plan for the
City of Renton Department of Co nity & Economic Development
THE PINES PRELIMINARY PLAT
Report of September 20, 2016
Hearing Examiner Recommendation
I LUA16-000413,ECF,PP,M0D
Page 18 of 20
1. CONCLUSIONS:
1. The subject site is located in the Residential Medium Density (MD) Comprehensive Plan designation and
complies with the goals and policies established with this designation provided all conditions of
approval are met, see FOP 17.
2. The subject site is located in the Residential — 8 (R-8) zoning designation and complies with the zoning
and development standards established with this designation provided the applicant complies with City
Code and conditions of approval, see FOP 18.
3. The proposed plat complies with the Residential Design and Open Space Standards provided the
applicant complies with City Code and conditions of approval, see FOP 19.
4. The proposed plat complies with Modification Criteria, specifically Modification Request 1 Monroe Ave
NE, provided the applicant complies with City Code and conditions of approval, see FOP 20.
5. The proposed plat complies with Modification Criteria, specifically Modification Request 2 Road A,
provided the applicant complies with City Code and conditions of approval, see FOP 20.
6. The proposed plat complies with Modification Criteria, specifically Modification Request 3 Shared
Driveway, provided the applicant complies with City Code and conditions of approval, see FOP 20.
7. The proposed plat complies with the subdivision regulations as established by City Code and state law
provided all advisory notes and conditions are complied with, see FOP 21.
HEXReportPinesPP
water main extension. The proposed subdivision will be required to install a minimum 8 -
inch water main extension into the development connecting to the existing 10 -inch
water main in Monroe Ave NE.
Each proposed lot shall have a separate meter. The project proposes a 1 inch water
service line and meter to each lot, for a total of fourteen (14) new domestic water
service lines and meters. The total water SDC fee is $38,940.00 for (14) 1 inch meters
including a credit of (2) % inch meters. This is payable at construction permit issuance.
Water service installation charges for each proposed 1 inch water service is $2,850.00
per meter. The total water service installation fee is $39,900.00 for (14)1 inch meters.
This is payable at construction permit issuance. Drop in meter fee is $460.00 per meter.
The total water drop in meter fee is $6,440.00 for (14) 1 inch meters. This is payable at
issuance of the building permit.
Sanitary Sewer: The subject property is within the City of Renton's sewer service area.
There is a 12 -inch sewer main located in Monroe Ave NE and an 8-ich sewer main
located along the east property line of 850 Monroe Ave NE.
The proposed sewer main improvements as shown on the Generalized Utility Plan
(Exhibit 6) and Road Profile and Details (Exhibit 5) provide a conceptual plan for the
sewer main extension. The proposed subdivision will be required to install a minimum 8 -
inch sewer main extension into the development connecting to the existing 12 -inch
sewer main located in Monroe Ave NE. If not already existing, an easement will be
required far the sewer main along the east property lines.
All existing side sewers will be required to be cut and capped during demolition of the
properties. New side sewers shall be installed to serve each individual property. A
redevelopment credit of the wastewatersystem development charges in the amount of
$2,242.00 will be applied to each of the (2) existing meters to 850 and 870 Monroe Ave
NE if they are abandoned and capped at the main line.
1. CONCLUSIONS:
1. The subject site is located in the Residential Medium Density (MD) Comprehensive Plan designation and
complies with the goals and policies established with this designation provided all conditions of
approval are met, see FOP 17.
2. The subject site is located in the Residential — 8 (R-8) zoning designation and complies with the zoning
and development standards established with this designation provided the applicant complies with City
Code and conditions of approval, see FOP 18.
3. The proposed plat complies with the Residential Design and Open Space Standards provided the
applicant complies with City Code and conditions of approval, see FOP 19.
4. The proposed plat complies with Modification Criteria, specifically Modification Request 1 Monroe Ave
NE, provided the applicant complies with City Code and conditions of approval, see FOP 20.
5. The proposed plat complies with Modification Criteria, specifically Modification Request 2 Road A,
provided the applicant complies with City Code and conditions of approval, see FOP 20.
6. The proposed plat complies with Modification Criteria, specifically Modification Request 3 Shared
Driveway, provided the applicant complies with City Code and conditions of approval, see FOP 20.
7. The proposed plat complies with the subdivision regulations as established by City Code and state law
provided all advisory notes and conditions are complied with, see FOP 21.
HEXReportPinesPP
City of Renton Department of Coraty & Economic Development
THE PINES PRELIMINARY PLAT
Report of September 20, 2016
Hearing Examiner Recommendotion
` LUA16-000413,ECF,PP,M00
Page 19 of 20
8. The proposed plat complies with the street standards as established by City Code, provided the project
complies with all advisory notes and conditions of approval contained herein, see FOF 21
9. There are safe walking routes to school and the school bus stop, see FOF 22.
10. There are adequate public services and facilities to accommodate the proposed plat, see FOF 22.
J. RECOMMENDATION:
Staff recommends approval of The Pines Preliminary Plat and three (3) modifications for Monroe Ave NE,
Road A, and shared driveway, File No. LUA16-000413, as depicted in Exhibit 2, subject to the following
conditions:
The applicant shall provide a final detailed landscaping plan compliant with RMC 4-8-120D at the time
of Utility Construction Permit review that provides 15 -feet of landscaping surrounding stormwater
Tract D. The vault may encroach into the landscaping screen, provided the landscaping can still be
planted on top of the vault. The final landscaping plan shall be approved prior to Utility Construction
Permit issuance. All tract landscaping shall be installed and inspected prior to plat recording.
2. The applicant shall provide a final landscaping plan for review and approval by the Current Planning
Project Manager at the time of Utility Construction Permit review that provides a berm within the 15 -
foot landscaping screen in stormwater Tract D along the Monroe Ave NE frontage. The final landscaping
plan shall be approved prior to Utility Construction Permit issuance. The berm shall be installed and
inspected prior to plat recording.
3. The applicant shall be required to create a homeowner's association for the shared maintenance and
responsibility of the shared tracts and all other shared improvements of this development. A draft of
the document(s) shall be submitted to Current Planning Project Manager for the review and approval
by the City Attorney and Property Services section prior to the recording of the final plat. The HOA
documents shall be recorded concurrently with the final plat.
4. The applicant shall provide a Road and Grading Plan for review and approval by the Current Planning
Project Manager at the time of Utility Construction Permit review that provides tree protection
measures identified in RMC 4-4-1301-19 for offsite trees with drip lines that are within the subject
property.
5. The applicant shall provide a final landscaping plan for review and approval by the Current Planning
Project Manager at the time of Utility Construction Permit review that provides details of split -rail
fencing around Tree Retention Tract A and signage identifying the tract as tree protection. Split -rail
fencing and signage shall be installed and inspected prior to final plat recording.
6. The applicant shall revise the Preliminary Plat for review and approval by the Current Planning Project
Manager at the time of Utility Construction Permit review that provides a front yard setback variation
for at least one (1) lot for every four (4) abutting street fronting lots and the varied setbacks shall be
provided as a note on the face of the plat.
7. The applicant shall provide a plat layout color palette for the new single family homes for review and
approval by the Current Planning Project Manager prior to plat recording.
8. The applicant shall provide a revised paving plan for review and approval by the Current Planning
Project Manager, at the time of Utility Construction Permit review identifying the modified Monroe Ave
NE street section, as approved through Modification Request 1.
9. All future homes within the subdivision shall have a fire sprinkler system approved by the Renton Fire
Authority.
HEXReportPinesPP
City of Renton Department of Co
THE PINES PRELIMINARY PLAT I
Report of September 20, 2016
ity & Economic Development
Hearing Examiner Recommendotion
` LUA16-000413,ECF,PP,MOD
Page 20 of 20
10. The applicant shall provide a note on the face of the plat restricting access for lots 5 and 6 to the shared
driveway. The front of the future homes on lots 5 and 6 shall be oriented to the new residential street
(Road A) with garages located on the side or rear of the homes.
11. The applicant shall submit revised plans for review and approval by the Current Planning Project
Manager at the time of Utility Construction Permit review removing the four (4) pedestrian ramps
facing east along Monroe Ave NE.
HEXRe portPin esPP
The following exhibits were entered into the record:
Report to Hearing Examiner
0
EXHIBITS
Project Name: The Pines Preliminary Plat
Project Number: LUA16-000413,ECF,PP,MOD
Date of Hearing
Staff Contact
Project Contact/Applicant Project Location
September 27, 2016
Matthew Herrera, Senior Planner
Jaime Waltier, Harbour Homes 850 Monroe Ave NE
The following exhibits were entered into the record:
Exhibits 1-18:
Environmental Review Committee Report and Exhibits
Exhibit 19:
Hearing Examiner Staff Recommendation (dated September 20, 2016)
Exhibit 20:
Renton School District Capacity
Exhibit 21:
Environmental Determination of Nonsignificance
Exhibit 22:
Tree Retention Worksheet
Exhibit 23:
Renton Fire Authority Hammerhead Approval/Sprinkler Requirement
Exhibit 24:
Neighborhood Meeting Notes and Mailing
Exhibit 25:
Concurrency Test
Exhibit 26
Affidavit of Posting and Mailing
RentCITY OF
on
0
ft
DEPARTMENT OF COMMUAND ECONOMIC DEVELOPMENT Ren `on O
ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC MEETING DATE:
August 29, 2016
Project Name:
The Pines Preliminary Plat
Project Number:
LUA16-000413,ECF,PP,MOD
Project Manager:
Matthew Herrera, Senior Planner
Owner.
Beverly Stinde, 850 Monroe Ave NE, Renton, WA 98056
Applicant/Contact:
Jamie Waltier, Harbour Homes, LLC., 400 N. 34th St., Ste. 300, Seattle, WA
98117
Project Location:
850 & 870 Monroe Ave NE, Renton, WA 98056
Project Summary:
Proposed subdivision of two (2) existing single-family lots into 14 single-family
residential lots and three (3) tracts. The project site is located within a
Residential -8 (R-8) zoning designation. Proposed lots range in size from 5,001
square feet to 5,201 square feet that result in an overall net density of 7.53
dwelling units per acre. The proposed lots will be accessed from a new public
residential access street off Monroe Ave NE.
Site Area:
107,969 sq. ft.
STAFF
RECOMMENDATION:
Staff Recommends that the Environmental Review Committee issue a
Determination of Non -Significance.
Project Location Map
ERC REPORT EXhli?It
1
we..e w1+�ie�o�isw.���,w.,.+nlwr.lwlw-xwere:a�.es sit/m�
it i
3 G= :RCYCC=
Q qq �18RRRRR
No
rraarccr r L
n E PINES XXX—XXXX
--1 L—
� ? � q.�q •-moi
� a
I
1
E
n
m
n
o O,7
Na
: ,
oax
,
.I
as
I I
�o
;R
9 Rn
.1e1 a
=��Zf•1
S
�
—Z 30
is ��
1
n
j
: ,
oax
,
.I
as
I I
�o
----7
it
.1e1 a
4
mss.
t
L-er�y-J
Jr
I
, ,
I
L—mgr—J
- 3
�{I I —1
!f
w ----1
I
-I
1
r----1
f
W
p
g
um
Lm J
_ OL YAPM
AYFNF
r
9
a
THE PINES
xxx—xxxx
N
mm
c mo
zo z
1
mmm
y p -M
z =g5� m
25yv
P A-
g
o Z�mgs�
I mm
A
z
r.w. s 1.T ]rJl ..re•'r/werwlx-rix:re:.Vl.av siY/
It s
toPfl Pt,I HIrMt
THE PINES XXX-XXXX
I
I
I
I
I
A
I
I
I
I
1
I
II
R
�6
USI!
�a
ak
� a
jq�
a
a xa n
z�
00
R
M03
=o p
AND
=��Zm
zz ��
G]Zl�i�
8 Zmm�w
D o��
rnm
.193 f
Yv:}
THE PI P1NLS XXX—XXXX
c
11
a a
P#@4
'D
�
�
§
SEmRs _gxgg
_..... x.rmnc. ca�ler.aM-+c.lrrr-ylwlvsmrex�.fia eAlmr
1`ROJ ELf NPHt
THE PINES XXX—XXXX
MPS-n�g�?' M erf
g
--------- --- ----
--------------
30tlNOp
i I Al
j ED
r g N 1
Al pPi I f I n
-75
rr-7
IoI $ I1zI I
I I
1 I Nil! 1µly
1 9 R f l
.3mR
R
S
q
T � �s/� yypy�ff
M;oZm S I a A g�i•+`a�a8•eoe
a 3-2
Z2 ME
R g 8 °
R
$ §
� °u'em
7 r aq e
Earth
Solutions
NW «e
Geotechnical Engineering
Geology
Environmental Scientists
Construction Monitoring
Exhibit E
Renton 0
Entire Document
Available Upon
Request
ti.
GEOTECHNICAL ENGINEERING STUDY
STINDE 13 LOT RESIDENTIAL PLAT
850 & 870
MONROE AVENUE NORTHEAST
RENTON, WASHINGTON
ES -4427 '
05 -
$ellee,
25) 449.471y 1-
'150
s �+
Mm �a
Or
mzm a
4 zp
_;nZM g Z
nc j
S Oa VN
v -y�
T- m
I
OM s
Z cr
Z -
Z t°
E
a 1] R
PRWER —1
THE PINES XXX—XXXX
MONROE'AVENE
T
I I
J/A'IJ I I
I I
I r I
I !
I
I
I I
f
I I
r
�
I I
I N ,
I I
I I
I I
y
21 i I
I J
I
I
J
I y I
_J
1
I
t -i I
I I I
I
fII
I I
I I
� f
f I
I
1
I
I
I
! j
I j
4
0
9
TECHNICAL INFORMATION REPORT
for
THE PINES
PRELIMINARY PLAT
850 & 870 Monroe Avenue NE, Renton, Washington
DRS Project No. 16007
Renton File No. LUA16-000413
OwneNApplicant
Harbour Homes, LLC
400 North 34`h Street, Suite 300
Seattle, Washington 98103
Report Prepared by
D. R. STRONG Consulting Engineers, Inc.
6207 th Avenue
Kirkland, WA 98033
(425) 827-3063
Report Issue Date
July 19, 2016
9)2418 D. R_ STRONG Consulting Engineers Inc.
Technical Information Report
I
Exhibit 10
enton 0
Entire Document
Available Upon
Request
The Pines
Renton, Washington
9 PP.WL --
THE PINES XXX-XXXX
�� /iTONh'6cAVC'NE
MA
i
a ik
F m�
Z�
-1
mom
202
�g+5
gorzix
6
T�oz
^^
Gf llo �
8 Zm�r�N
1
} Y
IpC -I
D g Rml cam]
10
A
7
�e
$
R�� �
I �p I
I • I s
RhP
9 PP.WL --
THE PINES XXX-XXXX
�� /iTONh'6cAVC'NE
MA
R�� �
I �p I
I • I s
RhP
co
9
July 17, 2016
Jamie Waltier
Chris Burrus
Harbour Homes
1441 N. 34th Street, Suite 200
Seattle, WA 98103
Site: 850 & 870 Monroe Ave NE
Renton, Ave
TPN: 0923059117 & 0923059116
Square feet: 107,157
Dear Jamie:
8 P Creatwe Landscape Solutions 1
& 870 Monroe Ave NF, Renton
Thank you for requesting my services. On April 26th, 2016, I visited the site located above in Renton,
WA to perform a Visual Risk Assessment (VRA) for all significant trees onsite as well as, those offsite
trees with driplines that might extend over the site. The information gathered is included in this report
and is a necessary part to be included with the proposal to short plat.
In summary:
Tree Calculations
Total number of trees
57
Trees
Total number of exempt trees RDW + Non-viable
32.
Trees
Total number of viable trees
25
Trees
Total number of trees removed for construction
16
Trees
Total number of retained trees
9
Trees
Required 30% retention 25 X 30%=
7.5
Trees
I have included a detailed report of my findings. If you have any questions please call me. I can be
reached on my cell phone: 425.890.3808 or by email: sprince20ZRaol.com.
Warm regards,
t5t' T
Susan Prince
Creative Landscape Solutions
ISA Certified Arborist: PN #1418A
TRACE Certified Arborist: #418
17518 NE 119"h Way
Redmond, WA 98052
* Per city of Renton Municipal Code, a significant tree is one whose Diameter at Breast Height (DBH) is 6" or greater
Entire Document Exhibit
Available Upon 1
Request
t -Align Environmenta?
April 21, 2016
Mr. Jamie Waltier
Harbour Homes, LLC
400 N 34th Street, Suite 300
Seattle, WA 98103
Re: Wetland Evaluation — Monroe Avenue Assemblage, Renton, WA
Dear Jamie:
This correspondence follows your request that I conduct a preliminary wetland reconnaissance on
the parcels of land (Parcel Nos. 0923059116 and 0923059117), located at 850 Monroe Ave NE in
Renton, Washington The property under investigation includes two residential parcels. (See
Attached Location and Site Maps).
Data Collection
Prior to visiting the site, online information was obtained using the King County iMap system, the
US Fish and Wildlife Service online National Wetlands Inventory (NWI), and the Natural Resource
Conservation Service (MRCS) online soil mapping utility.
As shown in the Attached iMap photos, no mapped streams or wetlands are shown on the site.
Similarly, these maps show no streams or wetlands within 500 feet of the site, indicating that no
buffers from off-site critical areas would affect this parcel. The attached NWI map also depicts no
streams or wetlands on, or near the site.
Also attached is the NRCS soil report for the site. As described in the soil report, the parcels appear
to be underlain by Arents, Alderwood material, 6 to 15 percent slopes. This moderately well drained
soil is commonly found on till plains such as the Renton Highlands in which the site lies. This soil
exhibits a water table depth of 16 - 30 inches below the soil surface. This map unit is not typically
known to include hydric inclusions, which indicates that wetlands are not typically present within the
map unit.
Fieldwork
Fieldwork was conducted on March 2, 2016 using the three -parameter approach identified in the
Washington State Wetlands Identification and Delineation Manual (Washington Manual) (WDOE 1997) and
the Regional Supplement to the Corps of Engineers Wetland Delineation Manual.- Western Mountains, Valleys and
Coast Region (Regional Supplement) (USACE 2010), which are consistent with the Array Corps of
Engineers Wetlands Delineation Manual (ALOE Manual) (Environmental Laboratory 1987) and other
pertinent federal and local guidance (33 CFR 328.3 [a] [1-5]).
During a review of the parcel boundary, I walked the perimeter of the property and found no visible
indication of drainage onto, or leaving the site. I observed that the site contains one small, very
slight, depressional area within a driveway that is approximately 30 feet wide and 30 feet long. The
depression does not drain off of the site and it appears to exist due to compaction from vehicle
Bill Granger 14056 180th Ave SF. Renton, WA 90859 (206) 790-6132 Bii!@re-alignenv.com �Xhlblt
0 0
Letter of Understanding of Geologic Risk
I/we understand there are inherent risks whenever soil, geologic or hydrogeologic conditions are
involved with a construction project. Soil and geologic materials, including groundwater are variable in
nature. Geologic conditions vary vertically, laterally, and seasonally. The site soil is proven to be suitable
to support foundations, landscaping, pavement, and other associated infrastructure in the area_
However, the site soil also required careful planning and consideration with respect to design and
construction.
)/we understand, accept the risk and solely responsible of developing this property.
Signedr`Jt�
Nam'' / Date:
E14
0 9
Stinde
Construction Mitigation Description
The following narrative is provided to describe the proposed construction mitigation
measures that Harbour Homes, LLC "Harbour Homes" and the to be named general contractor
"Contractor" for Stinde will implement throughout the duration of the site development and
infrastructure period as well as during building construction.
Proposed Construction Dates Site Work): July 2017 -February 2018
Harbour Homes anticipates on beginning clearing and site development work in the mid-
summer of 2017 depending on the timing of approvals. Harbour Homes anticipates roughly a
180 day schedule to finalize all grading, storm, sewer, water and first lift of asphalt on the site.
The goal will be to have the site completely stabilized by November 1", 2017 before the fall.
Proposed Construction Dates(Building Constructioni:
Harbour Homes plans on beginning construction of a model home in April of 2018 and
anticipates starting two homes per month thereafter with an average construction timeline of
seven months to complete.
Hours & Days of Operation
Normal site hours of operation will be in compliance with the allowable working hours in the
City of Renton which are as follows:
For new single-family residences and non-residential construction, the permitted work hours are
7:O0am-8:O0pm Monday through Friday, 9:O0am-8:O0pm Saturday, and no work shall be
permitted on Sunday.
Proposed HaulinalTransportation Routes
The Stinde site is located on Monroe Avenue NE just south of 91h Street. The Contractor
anticipates utilizing one haul route to and from SR -900 (See attached Exhibit "A" for location).
Heading north on Monroe Ave NE, head west on NE 10th St to SR -900 then heading east or west
depending on the type of material import/export.
Measures to Minimize impacts
Harbour Homes and the Contractor will make every effort to minimize the impacts from this
project on the surrounding neighbors, the environment and traffic circulation for the
Entire Document Exhibit
Available Upon 15
Request
C
O ..
IM
m°
4 cr
m rn
k
kol m
O5
v z
C3f/g
-
ZmImmo
Z _..
Y
K
PINES
.v �L '
REVISIONS
a�o «E,
o
�e
LANDSCAPE PLAN
a
ITA ED
ti
a-
0
MMM
UUMU
UUMM
alMIM
RI -9-1 Rill 1
ogaoo4RRR
P
m
x
N �v
g
I
THE PINES
LANDSCAPE PLAN
1rm
L LEY. A�R
:R
RMSi0N5
xo ws omrox e
�rt °E6
-
G T A. C
Gibson Traffic frc Consultants, Inc.
Transportation-
MEMORANDUM � WES
To: Chris Burrus, Harbour Homes, LLC ' r
From: Brad Lincoln, PE
Project: Stinde DevelopmentI
GTC # 16-073
42307
Subject: Traffic Analysis
Date: July 19, 2016
This memorandum summarizes the trip generation calculations for the Stinde Development. The
development is located on the east side of Monroe Avenue NE, south of NE 10" Street. The
development is proposed to replace two existing single-family residential units with 14 single-family
residential units, a net increase of 12 single-family residential units. A site vicinity map in included
in Figure 1.
Figure 1: Site Vicinity
Entire Document 2802 Wetmore Avenue • Suite 220 - Everett WA, 98201
Available Upon Tel: 425-339-8266 • Fax: 425-258-2922 • E-mail: info@gibsontraffic.com Exhibit
Request 7
ADVISORY NOTES TO APPLJANT _
'I6-0004'13Jk0000-Renton
E�fY 10, IF
LUA
O'k
Aoplication Date: June 07, 2016 Site Address: 870 Monroe Ave NE
Name: The Pines Preliminary Plat Renton, WA 98056-3859
PLAN - Plannina Review - Land Use Version 1
I Communitv Services Review Comments Contract: Leslie Betlach 1425-430-6619 j LBetlach@rentonwa.gov I
Recommendations: 2. 5 feet bicycle lanes along Monroe as per adopted Trails and Bicycle master Plan (Project sheet Page #126) are
to be included. Revise street cross section.
Recommendations: Parks Impact fee per Ordinance 5670 applies.
Engineering Review Comments Contact: Ann Fowler 1425-430-73821 afovvler@rentonwa.gov
Recommendations: I have reviewed the application for the The Pines Preliminary Plat at 850 & 870 Monroe Ave NE (APN(`s) 092305 9116
& 9117) and have the following comments:
EXISTING CONDITIONS
Water Water service is provided by the City of Renton. The project is within the City of Renton's water service area in the Highlands 565
hydraulic zone. There is an existing 10 inch City water main in Monroe Ave NE which can deliver 3,800 gpm. The static water pressure is
approximately 75 psi at ground elevation of 390 ft.
Sewer Wastewater service is provided by the City of Renton. There is a 12 inch wastewater main located in Monroe Ave NE and an 8 inch
wastewater main located along the east properly line of 850 Monroe Ave NE.
Storm The existing properties do not contain stormwater facilities. There is an existing 24 inch stormwater main located in Monroe Ave
NE. Based on the City's flow control map, the site falls within the Peak Rate Flow Control Standard area matching Existing Site Conditions
and is within the East Lake Washington Drainage Basin.
Transportation The proposed development fronts Monroe Ave NE along the west property lines. Monroe Ave NE is classified as a Minor
Arterial Road. Existing right of way (ROW) width is approximately 60 feet.
CODE REQUIREMENTS
WATER
1. The proposed water main improvements as shown on the composite utilities civil plan submitted with the Land Use Application within
the site provides a conceptual plan for the water main extension_ The development will be required to install a minimum 8 inch water main
extension into the development, connecting to the existing 10 inch water main located in Monroe Ave NE.
Staff Comments:
i. If the dwellings exceed 3,600 square feet, a minimum 10 inch water main extension, or fire sprinklers, will be required.
2. Installation of fire hydrants within 300 feet of each lot is required by Renton Fire Prevention Department. The number and location of
new hydrants will be dependent upon the finished square footage of the homes.
3. Each lot shall have a separate meter. The project proposes a 1 inch water service line and meter to each lot, for a total of fourteen (14)
new domestic water service lines and meters.
4. The development is subject to applicable water system development charges and meter installation fees based on the size of the
water meters.
a. Water system development charges for each proposed 1 inch domestic water service is $3,245.00 per meter or $45,430.00 for (14) 1
inch meters.
b. A redevelopment credit of the water system development charges in the amount of $3,245.00 will be applied to each of the two (2)
existing'/ inch meters servicing the property(ies) if they are abandoned and capped at the main line or for a total reduction of $6,490.00
for (2) % inch meters.
c. The total water SDC fee is $38,940.00 for (14) 1 inch meters including a credit of (2) % inch meters. This is payable at construction
permit issuance.
5. Water service installation charges for each proposed 1 inch water service is $2,850.00 per meter. The total water service installation
fee is $39,900.00 for (14)1 inch meters. This is payable at construction permit issuance.
6. Drop in meter fee is $460.00 per meter. The total water drop in meter fee is $6,440.00 for (14) 1 inch meters. This is payable at
issuance of the building permit.
7, Additional water system development charges and water meter charges will apply if a landscape irrigation meter is required and is
based on the size of the meter.
SEWER
1. The proposed water main improvements as shown on the composite utilities civil plan submitted with the Land Use Application within
the site provides a conceptual plan for the sewer main extension. The development will be required to install a minimum 8 inch sewer
main extension into the development, connecting to the existing 12 inch sewer main located in Monroe Ave NE.
2. If it does not existing, an easement will be required for the sewer main existing along the east property lines.
3. All existing side sewers will be required to be cut and capped during demolition of the properties. New side sewers shall be installed
to serve each individual property_
Entire DO(U.Hent E7Chli]It
Ran: August 24, 2016i .,':`,dgbl,-`gyp-on 18 Page 1 of 4
E!rjuf t
Matthew Herrera
From: Randy Matheson <randy_matheson@rentonschools.us>
Sent: Friday, August 19, 2016 10:56 AM
To: Sabrina Mirante
Cc: Matthew Herrera
Subject: RE: City of Renton Notice of Application & School Information Request - The Pines
Preliminary Plat
Answers in red below.
Randy Matheson, Executive Director, Community Relations Renton School District 1 3005W 7th Street, Renton WA 98057 1425.204.2345
rarndy.matheson rentonschools.us I www.rentonschools.us I
enton
From: Sabrina Mirante [mailto:SMirante@Rentonwa.gov]
Sent: Thursday, August 18, 2016 12:31 PM
To: Randy Matheson <randy.matheson@rentonschools.us>
Cc: Matthew Herrera <MHerrera@Rentonwa_gov>
Subject: City of Renton Notice of Application & School Information Request - The Pines Preliminary Plat
SCHOOL INFORMATION REQUEST
Subject: The Pines Preliminary Plat
LUA16-000413, ECF, MOD, PP
The City of Renton's Department of Community and Economic Development (CED) has received an application for a
preliminary planned urban development located at 870 Monroe Ave NE.
In order to process this application, CED needs to know which Renton schools would be attended by children living in
residences at the location indicated above. Please fill in the appropriate schools on the list below and return this letter
to my attention, City of Renton, CED, Planning Division, 1055 South Grady Way, Renton, Washington 98057 or fax to
(425) 430-7300, by August 24, 2016.
Elementary School: Highlands Elementary School (No school bus provided; within walking distance)
Middle School: Dimmitt Middle School (School bus transportation provided)
High School: Renton High School (School bus transportation provided)
Will the schools you have indicated be able to handle the impact of the additional students estimated to come from the
proposed development? Yes YES No_.
Any Comments:
Thank you for providing this important information. If you have any questions regarding this project, please contact me
at (425) 430-6593.
E.nt3re� C�ac;trn��r�t
Avaadable Upon 2Q
3eque-�t
�f7Y 0
DEPARTMENT OF COMMUNITY Ren on 9
AND ECONOMIC DEVELOPMENT
ENVIRONMENTAL (SEPA) DETERMINATION OF NON -SIGNIFICANCE -(DNS)
PROJECT NUMBER: LUA16-000413,ECF,PP,MOD
APPLICANT: Jamie Waltier, harbour Homes, LLC., 400 N. 34th St., Ste. 300, Seattle,
WA 98117
PROJECT NAME: The Pines Preliminary Plat
PROJECT DESCRIPTION: Proposed subdivision of two (2) existing single-family lots into 14 single-
family residential lots and three (3) tracts. The project site is located within a Residential -8 (R-8) zoning
designation. Proposed lots range in size from 5,001 square feet to 5,201 square feet that result in an overall net
density of 753 dwelling units per acre. The proposed lots will be accessed from a new public residential access
street off Monroe Ave NE.
PROJECT LOCATION: 850 & 870 Monroe Ave NE, Renton, WA 98056
LEAD AGENCY: City of Renton
Environmental Review Committee
Department of Community & Economic Development
The City of Renton Environmental Review Committee has determined that it does not have a probable significant
adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW
43.210.030 (2)(c). This Determination of Non -Significance is issued under WAC 197-11-340. Because other agencies of
jurisdiction may be involved, the lead agency will not act on this proposal for fourteen (14) days.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on September 16, 2016
Appeals must be filed in writing together with the required fee with: Hearing Examiner, City of Renton, 1055 South
Grady Way, Renton, WA 98057. Appeals to the Examiner are governed by RMC 4-8-110 and more information may be
obtained from the Renton City Clerk's Office, (425) 430-6510.
PUBLICATION DATE:
DATE OF DECISION:
SIGNATURES:
SEPTEMBER 2, 2016
AUGUST 29, 2016
Gregg Tim e m ,Administrator
Public W Department Date
T
K iy eymer, A min strator
Community Services Department Date
_ glz_lllc�
ar Peterson, Administrator
Fire & Emergency Services Date
C.E. "Chip" Vincent, Administrator
Department of Community & Date
Economic Development
Exhibit
21
DEPARTMENT OF COMMUNO {- `
AND ECONOMIC DEVELOPMENT e in on {
TREE RETENTION WORKSHEET
Planning Division
1055 South Grady Way -Renton, WA 98057
Phone: 425-430-7200 1 www.rentonwa. ov
1. Total number of trees over 6" diameter', or alder or cottonwood
trees at least 8" in diameter on project site 57 trees
2. Deductions: Certain trees are excluded from the retention calculation:
Trees that are dangerous 17 trees
Trees in proposed public streets 15 trees
Trees in proposed private access easements/tracts trees
Trees in critical areas3 and buffers trees
Total number of excluded trees: 32 trees
3. Subtract line 2 from line 1: 25 trees
4. Next, to determine the number of trees that must be retained4, multiply line 3 by:
1 Measured at 4.5' above grade.
2 A tree certified, in a written report, as dead, terminally diseased, damaged, or otherwise dangerous to persons or property by a licensed
landscape architect, or certified arborist, and approved by the City.
a Critical areas, such as wetlands, streams, floodplains and protected slopes, are defined in RMC 4-3-050.
° Count only those trees to be retained outside of critical areas and buffers.
5 The City may require modification of the tree retention plan to ensure retention of the maximum number of trees per RMC 4-4-130H7a.
6 When the required number of protected trees cannot be retained, replacement trees, with at least a two-inch (2") caliper or an evergreen at least
sixfeet (6') tail, shall be planted. See RMC4-4-130.H,1.e.(ii) for prohibited types of replacement trees.
1
R:\2016\0\1600713\Documents\Reports\Preliminary\TreeRetentionworksheet.doc Exhibit Rev -08/2015
22
0.3 in zones RC, R-1, R-4, R-6 or R-8
0.2 in all other residential zones
0.1 in all commercial and industrial zones 7.5
trees
5.
List the number of 6" in diameter, or alder or cottonwood trees
over 8" in diameter that you are proposing5 to retain4: 9
trees
6.
Subtract line 5 from line 4 for trees to be replaced:
(if line 6 is zero or less, stop here. No replacement trees are required) 0
trees
7.
Multiply fine 6 by 12" for number of required replacement inches:
inches
8.
Proposed size of trees to meet additional planting requirement:
(Minimum 2" caliper trees required)
inches per tree
9.
Divide line 7 by line 8 for number of replacement trees':
(If remainder is .5 or greater, round up to the next whole number)
trees
1 Measured at 4.5' above grade.
2 A tree certified, in a written report, as dead, terminally diseased, damaged, or otherwise dangerous to persons or property by a licensed
landscape architect, or certified arborist, and approved by the City.
a Critical areas, such as wetlands, streams, floodplains and protected slopes, are defined in RMC 4-3-050.
° Count only those trees to be retained outside of critical areas and buffers.
5 The City may require modification of the tree retention plan to ensure retention of the maximum number of trees per RMC 4-4-130H7a.
6 When the required number of protected trees cannot be retained, replacement trees, with at least a two-inch (2") caliper or an evergreen at least
sixfeet (6') tail, shall be planted. See RMC4-4-130.H,1.e.(ii) for prohibited types of replacement trees.
1
R:\2016\0\1600713\Documents\Reports\Preliminary\TreeRetentionworksheet.doc Exhibit Rev -08/2015
22
From: Chris Burrus <CBurrus@harbourhomes.com>
Sent: Thursday, June 09, 2016 8:49 AM
To: Matthew Herrera
Subject: FW: Stinde Preliminary Plat Hammerhead Variance Request PRE16-000049
Attachments: turnaround.pdf
From: Corey W Thomas imailto:CThomas@Rentonwa_gov]
Sent: Wednesday, April 06, 2016 4:18 PM
To: 'Maher loud!'
Cc: Jamie Waltier; Chris Burrus; Clark Close
Subject: RE: Stinde Preliminary Plat Hammerhead Variance Request PRE16-000049
Maher,
The fire chief has approved your variance request with the condition that all future homes in the entire
plat shall require an approved residential fire sprinkler system. The placement and configuration of the
hammerhead turnaround shall be a mutually agreed upon location to be determined by the planning
and fire department. The hammerhead shall meet all fire department specifications, see attached
above. Contact Clark Close for exact placement of the hammerhead.
Corey Thomas
Fire Plans Reviewer/Inspector III
City of Renton Fire & Emergency Services Department
COMMUNITY RISK REDUCTION
Phone: 425-430-7024 Fax: 425-430-7022
Email: cthomas(a7rentonwa.gov
1055 South Grady Way
Renton, WA 98057-3232
Professionalism • Integrity • Leadership • Accountability • Respect
From: Maher Joudi ma!Ito:maher.ioudi drstron .com]
Sent: Tuesday, March 22, 2016 18:33
To: Corey W Thomas
Cc: Jamie Waltier; Chris Burrus (CBurrus harbourhomes.com)
Subject: Stinde Preliminary Plat Hammerhead Variance Request PRE16-000049
Hi Corey,
We are moving forward on this project and per your comments at the pre app, I am emailing a letter
requesting allowance of a hammerhead on a dead end road longer than 300'.
Please see attached.
0 Exhibit
Entire Document 23
Available Upon
Request
Harbour
Home TM
PROJECT NAME:
APPLICANT:
PROJECT LOCATION:
DATE OF PUBLIC MEETING/TIME:
Dear Resident,
9
NOTICE OF PUBLIC MEETING
EVERGREEN PLACE SUBDIVISION:
PRELIMINARY PLAT APPICATION
Evergreen Place
Harbour Homes, LLC
850 & 870 Monroe Ave NE, Renton, WA 98056
Monday, June 6th from 5:00 to 6:15pm
Harbour Homes, LLC ("Harbour Homes") is preparing to submit a Preliminary Plat application to
build Evergreen Place, a 14 lot subdivision at 850 and 870 Monroe Ave, Renton, WA 98056. These would
be spacious lots, all 5,000 square feet or higher, and would include a tree retention tract and a park at
the front of the plat along Monroe Ave NE.
Harbour Homes is a local, private company and has been building single family homes in the
Seattle area for over thirty years. You can read more about our company at https://harbourhomes.com.
Harbour Homes is excited for this opportunity to build in the neighborhood and is looking for
feedback from the community members. To that effect we are hosting a Community Meeting on
Monday, lune 6th from 5:00 to 6:15pm at the Renton Highlands Library, 2801 NE 101h St, Renton, WA
98056. We cordially invite you to join us for a presentation and discussion of our proposed design and
project. We welcome your questions and input. Snacks and refreshments will be provided.
The intent of this meeting is to facilitate an informal discussion between Harbour Homes and
the neighbors regarding this project. While required by the City of Renton, this meeting is not conducted
by the City of Renton and is in addition to any future public hearing or public comment opportunities
available under City of Renton development review processes.
We look forward to meeting you and in the meantime, should you have any questions, please
feel free to contact myself at (206) 315-8130 or cburrus@harbourhomes.com. Thank you for your
consideration and I do hope you will be able to join us on Monday, June 6th.
Thank you,
Chris Burrus
Assistant Project Engineer
Exhibit
Entire Document 24
Available Upon
Request
0
0
DEPARTMENT OF COMMUNITY 1100111
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: September 20, 2016
TO: Matt Herrera, Senior Planner
FROM: Brianne Bannwarth, Development Engineering Manager
SUBJECT: Traffic Concurrency Test — The Pines;
File No. LUA16-000413
Proposed subdivision of two (2) existing single-family lots into 14 single-family residential lots
and three (3) tracts. The project site is located within a Residential -8 (R-8) zoning designation.
Proposed lots range in size from 5,001 square feet to 5,201 square feet that result in an overall
net density of 7.65 dwelling units per acre. The proposed lots will be accessed from a new
public residential access street off Monroe Ave NE. Two existing single-family homes and their
associated improvements will be removed to accommodate the proposed subdivision.
The proposed development would generate approximately 114 net new average weekday daily
trips. During the weekday AM peak hour, the project would generate approximately 12 net new
trips (3 inbound and 9 outbound). During the weekday PM peak hour, the project would
generate approximately 12 net new trips (8 inbound and 4 outbound). The proposed project
passes the City of Renton Traffic Concurrency Test per RMC 4-6-070.D as follows:
Traffic Concurrency Test Criteria
Pass
lmplementation of citywide Transportation Plan
Yes
Within allowed growth levels
Yes
Project subject to transportation mitigation or impact fees
Yes
Site specific street improvements to be completed by project
Yes
Traffic Concurrency Test Passes
enton
Exhibit
Entire Document
Available Upon
Request
Ah
Alk
SW _MW
CITY OF RENTON
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT - PLANNING DIVISION
AFFIDAVIT OF SERVICE BY MAILING
On the 1st day of August, 2016, 1 deposited in the mails of the United States, a sealed envelope containing
Notice of Application and Acceptance documents. This information was sent to:
Name
Representing
Agencies
See Attached
Beverly Stinde
Owner
Jamie Walties, Harbour Homes
Applicant
Maher Joudi, DR Strong Consulting
Contact
300' Surrounding Property Owners
See Attached
(Signature of Sender):
STATE OF WASHINGTON
COUNTY OF KING
t
1 certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct,
1 know or have satisfactory evidence that Sabrina Mirante
signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses and purposes
mentioned in the instrument. ��_'\ rrr��t► � s
SLY Pp ' Fr
Dated: 8 V
Nota ublic in and for the State of W _ ng'?on ,a
Notary (Print}: ..� f �% rau%a
My appointment expires: Alt,s .2 q ::) b Q
Project Name: The Pines Preliminary Plat
Project Number:. LUA16-000413, ECF, PP, MOD
template - affidavit of service by mailing
,/f Q�iiylri4rexxr�`��'�
Entire Document Exhibit
Available. Upon
Request
September 2, 2016
0 0
Denis Law Mayor
Community & Economic Development C. E_ "Chip" Vincent, Administrator
Washington State
Department of Ecology
Environmental Review Section
PO Box 47703
Olympia, WA 98504-7703
Subject: ENVIRONMENTAL (SEPA) THRESHOLD DETERMINATION
Transmitted herewith is a copy of the Environmental Determination for the following
project reviewed by the Environmental Review Committee (ERC) on August 29, 2016:
SEPA DETERMINATION: Determination of Non -Significance (DNS)
PROJECT NAME: The Pines Preliminary Plat
PROJECT NUMBER: LUA16-000413, ECF, PP,MOD
Appeals of the environmental determination must be filed in writing on or before 5:00
p.m. on September 16, 2016, together with the required fee with: Hearing Examiner,
City of Renton, 1055 South Grady Way, Renton, WA 98057. Appeals to the Examiner are
governed by RMC 4-8-110 and information regarding the appeal process may be
obtained from the City Clerk's Office, (425) 430-6510.
Please refer to the enclosed Notice of Environmental Determination for complete
details. If you have questions, please call me at (425) 430-6593.
For the Environmental Review Committee,
Matthew Herrera
Senior Planner
Enclosure
cc: King County wastewater Treatment Division Ramin Pazooki, WSDOT, NW Region
Boyd Powers, Department of Natural Resources Larry Fisher, WDFW
Karen Walter, Fisheries, Muckleshoot Indian Tribe Duwamish Tribal Office
Melissa Calvert, Muckleshoot Cultural Resources Program Us Army Corp. of Engineers
Gretchen Kaehler, Office of Archaeology & Historic Preservation
1055 South Grady Way, Renton, WA 98057 • rentonwa.gov
0
c Tv or
DEPARTMENT OF COMMUNITYtt1�'1
e
AND ECONOMIC DEVELOPMENT �1 V11
ENVIRONMENTAL (SEPA) DETERMINATION OF NON -SIGNIFICANCE -(DNS)
PROJECT NUMBER: LUA16-000413,ECF,PP,MOD
APPLICANT: Jamie Waltier, Harbour Homes, LLC., 400 N. 34`h St., Ste. 300, Seattle,
WA 98117
PROJECT NAME: The Pines Preliminary Plat
PROJECT DESCRIPTION: Proposed subdivision of two (2) existing single-family lots into 14 single-
family residential lots and three (3) tracts. The project site is located within a Residential -8 (R-8) zoning
designation. Proposed lots range in size from 5,001 square feet to 5,201 square feet that result in an overall net
density of 7.53 dwelling units per acre. The proposed lots will be accessed from a new public residential access
street off Monroe Ave NE.
PROJECT LOCATION: 850 & 870 Monroe Ave NE, Renton, WA 98056
LEAD AGENCY: City of Renton
Environmental Review Committee
Department of Community & Economic Development
The City of Renton Environmental Review Committee has determined that it does not have a probable significant
adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW
43.21C.030 (2)(c). This Determination of Non -Significance is issued under WAC 197-11-340. Because other agencies of
jurisdiction may be involved, the lead agency will not act on this proposal for fourteen (14) days.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on September 9, 2016.
Appeals must be filed in writing together with the required fee with: Hearing Examiner, City of Renton, 1055 South
Grady Way, Renton, WA 98057. Appeals to the Examiner are governed by RMC 4-8-11.0 and more information may be
obtained from the Renton City Clerk's Office, (425) 430-6510.
PUBLICATION DATE:
DATE OF DECISION:
SIGNATURES:
SEPTEMBER 2, 2016
AUGUST 29, 2016
�AeOa Z1WeVk,4— do.
Gregg Zim e m , Administrator
Public W Department Date
K4f ly eymer, A Rlnistrator
Community Services Department Date
Mark'Peterson, Administrator
Fire & Emergency Services Date
C.E. "Chip" Vincent, Administrator
Department of Community & Date
Economic Development
DEPARTMENT OF COMMUPTY
CITY 10 1;
AND ECONOMIC DEVELOPMENT Renton 0
ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC MEETING DATE.
August 29, 2016
Project Name:
The Pines Preliminary Plat
Project Number:
LUA16-000413,ECF,PP,MOD
Project Manager:
Matthew Herrera, Senior Planner
Owner.
Beverly Stinde, 850 Monroe Ave NE, Renton, WA 98056
Applicant/Contact:
Jamie Waltier, Harbour Homes, LLC., 400 N. 34th St., Ste. 300, Seattle, WA
98117
Project Location:
850 & 870 Monroe Ave NE, Renton, WA 98056
Project Summary:
Proposed subdivision of two (2) existing single-family lots into 14 single-family
residential lots and three (3) tracts. The project site is located within a
Residential -8 (R-8) zoning designation. Proposed lots range in size from 5,001
square feet to 5,201 square feet that result in an overall net density of 7.S3
dwelling units per acre. The proposed lots will be accessed from a new public
residential access street off Monroe Ave NE.
Site Area:
107,969 sq. ft.
STAFF
RECOMMENDATION:
Staff Recommends that the Environmental Review Committee issue a
Determination of Non -Significance.
Project Location Map
FRC REPORT
City of Renton Department of Communityconomit Development *Environmental Review Committee Report
THE PINES PRELIMINARY PLAT L UA16-
0 413,ECF,PP,M0D
Report of August 29, 2016 Page 2 of 6
PART ONE: PROJECT DESCRIPTION / BACKGROUND
The applicant is requesting environmental review and preliminary plat approval to subdivide two (2)
existing single-family lots into 14 -single family lots, one (1) storm facility tract, one (1) open space/tree
protection tract, and one (1) landscape tract (Exhibit 2). The site is located at 850 and 870 Monroe Ave NE
and identified by the King County Assessor's Office as parcels 092305-9116 and 092305-9117, respectively
(Exhibit 3). The site currently contains two single-family dwelling units and several outbuildings that are
proposed to be removed.
The subject property consists of two Residential -8 (R-8) zoned parcels totaling 2.45 acres. The subject
property abuts Monroe Ave NE along the western boundaries. The proposed lots range in in size from
5,001 square feet to 5,201 square feet that result in an overall net density of 7.53 dwelling units per acre.
Surrounding properties (abutting and across Monroe Ave NE) are also zoned R-8 and developed with
single-family residential dwellings.
Access to the proposed subdivision would be provided by a new residential access street within 53 -feet of
right-of-way off Monroe Ave NE that will contain a hammerhead and then dead-end (Exhibits 4 & 5). New
frontage improvements along Monroe Ave NE adjacent to the site will be constructed by the applicant
consisting of radius, curb, gutter, planter strip, and sidewalk. The applicant will construct a new water and
sewer main to serve the proposed lots within the new residential street right-of-way and connect to the
existing mains in Monroe Ave NE (Exhibits 5 & 6). Construction of infrastructure improvements and
building pad preparation will require approximately 1,226 cubic yards of cut and 2,207 cubic yards of fill
resulting in a net volume of 981 cubic yards of fill.
The site is generally flat with an elevation of 402 -feet along the eastern boundary and 392 -feet along the
western boundary (Exhibit 7). The City's Critical Areas map identifies a landslide hazard area in the central
and western portions of the property. According to the Geotechnical Study prepared by Earth Solutions,
NW (Exhibit 8), the potential for landslides is very low as the site lacks steep slopes and conditions are not
conducive to landslides.
The developed site is required to provide Level 2 flow control and Basic Water Quality treatment. The
applicant proposes to construct a detention/wetvault within a 5,217 square foot stormwater tract in the
southwestern portion of the project site adjacent to Monroe Ave NE. to comply with stormwater
requirements (Exhibits 9 & 10).
The property contains 57 significant trees comprised of a mixture of native species, pioneer species, and
ornamentals (Exhibits 11 & 12). The applicant proposes to retain a stand of trees within a 3,740 square
foot tree protection tract on the northwestern portion of the project site adjacent to Monroe Ave NE. A
1,020 square foot open space/landscape is proposed at the dead-end of the new residential access street.
A wetland evaluation prepared by Re -Align Environmental (Exhibit 13) concluded that no wetlands or
streams were on the subject property and no portion of the subject property is within a buffer of off-site
wetlands or streams. The City s Critical Area map does not identify any wetlands or streams on or near the
subject property.
FRC REPORT 16-000413
City of Renton Department of Communi onomic Development nvironmentai Review Committee Report
THE PINES PRELIMINARY PLAT LUA16-
WW13,ECF,PP,M0D
Report of August 29, 2016 Page 3 of 6
PART TWO: ENVIRONMENTAL REVIEW
In compliance with RCW 43.210.240, the following environmental (SEPA) review addresses only those
project impacts that are not adequately addressed under existing development standards and
environmental regulations.
A. Environmental Threshold Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible
Officials:
Issue a DNS with a 14 -day Appeal Period.
B. Mitigation Measures
None recommended
C. Exhibits
Exhibit 1 ERC Report
Exhibit 2 The Pines Preliminary Plat
Exhibit 3 Neighborhood Detail Map
Exhibit 4 Conceptual Road & Grading Plan
Exhibit 5 Road Profile & Details
Exhibit 6 Generalized Utility Plan
Exhibit 7 Topography Survey
Exhibit 8 Geotechnical Engineering Study prepared by by Earth Solutions NW, LLC (dated
April 27, 2016)
Exhibit 9 Drainage Control Plan
Exhibit 10 Technical Information Report prepared by D.R. Strong Consulting Engineers, Inc.
(dated July 19, 2016)
Exhibit 11 Tree Cutting & Land Gearing Plan
Exhibit 12 Arborist Report prepared by Creative Landscape Solutions (dated July 17, 2016)
Exhibit 13 Wetland Evaluation prepared by Re -Align Environmental (dated April 21, 2016)
Exhibit 14 Letter of Understanding of Geologic Risk
Exhibit 15 Construction Mitigation Description
Exhibit 16 Landscape Plan w/ Planting Schedule
Exhibit 17 Vehicle Trip Generation Memorandum prepared by Gibson Traffic Consultants,
Inc. (dated July 19, 2016)
Exhibit 18 Advisory Notes to Applicant
D. Environmental Impacts
The Proposal was circulated and reviewed by various City Departments and Divisions to determine
whether the applicant has adequately identified and addressed environmental impacts anticipated to
occur in conjunction with the proposed development. Staff reviewers have identified that the proposal
is likely to have the following probable impacts:
1. Earth
FRC REPORT 16-000413
City of Renton Department of Communifficonomic Development l kvironmentol Review Committee Report
THE PINES PRELIMINARY PLAT LUA16-
OW413,ECF,PP,MOD
Report of August 29, 2016 Page 4 of 6
Impacts: A geotechnical engineering study was prepared by Earth Solutions NW, LLC (dated April
27, 2016) and submitted with the land use application. The applicant anticipates approximately
1,226 cubic yards of cut and 2,207 cubic yards of fill will be needed to construct the subdivision
infrastructure and prepare building pads. Grade cuts between 10 to 15 feet will be necessary to
construct the stormwater vault.
The study identified the project site as relatively flat, which was further verified on the submitted
topographic survey. Topographic relief over the slope descending from east to west is 10 -feet.
Seven (7) test pits were excavated via backhoe on the subject property on March 18, 2016. Topsoil
was encountered in the upper 4-24 inches of existing grades. One test pit location in the south-
central portion of the site contained fill material classified as loose to medium dense, silty sand
with gravel. Native soils underlying topsoil and fill were identified as Vashon glacial till and Vashon
recessional outwash deposits consistent with the geologic mapping of the subject property. The
study found no evidence of a landslide hazard as the site lacks steep slopes or conditions that
would trigger a landslide. The applicant has submitted a Letter of Understanding Geologic Risk
(Exhibit 14) with the land use application.
The geotechnical study concludes that the site is compatible with the proposed development. The
proposed structures may be constructed on conventional, continuous, and spread footing
foundations bearing upon competent native soil, recompacted native soil, or new structural fill.
Construction of the proposed stormwater vault was also found to be feasible. The report included
recommendations regarding site preparation and grading, excavation, foundation support, slab -on -
grade floors, stormwater detention, vault design, drainage, utilities, and pavement. The applicant
has submitted a Construction Mitigation Plan that identifies permitted work hours, proposed
construction dates, and preliminary hauling route (Exhibit 15). It is anticipated that the City's
currently adopted erosion control, construction, and drainage regulations would adequately
mitigate for any impacts that could result from the proposed development; therefore no further
mitigation is recommended.
Mitigation Measures: No further mitigation recommended
Nexus: Not Applicable.
2. Water
a. Storm Water
Impacts: A Preliminary Drainage Report was prepared by Q.R. Strong Consulting Engineers, Inc.
(dated July 19, 2016) and submitted with the project application. The site is within the Peak Rate
Flow Control Standard Area. The project is required to provide Level 2 Flow Control and Basic
Water Quality Treatment. The development is subject to Full Drainage Review in accordance with
the 2009 King County Surface Water Design Manual (KCSWDM) and the City of Renton
Amendments to the KCSWDM. All core and special requirements have been discussed in the
provided drainage report.
Existing stormwater on the site sheet flows east to west toward Monroe Ave NE. Sheet flow is
captured by the curb and gutter located on the east side of Monroe Ave NE. The drainage is then
conveyed to a 24 -inch diameter pipe and flows south through the existing stormwater system. No
downstream flooding or erosion issues were identified in the drainage report.
ERC REPORT 16-000413
City of Renton Deportment of Communit conomk Development Environmental Review Committee Report
THEMES PRELIMINARY PLAT LUA16-
OM13,ECF PP,MOD
Report of August 29, 2016 Page 5 of 6
Stormwater improvements proposed to accommodate the new development will consist of a
detention vault to provide flow control for the new and replaced impervious surfaces with a
wetvault component that will provide the required Basic Water Quality. The vault shall be designed
in accordance with the KCSWDM and the City of Renton Amendments to the manual. Separate
structural plans will be required to be submitted for review and approval under a separate building
permit for the detention and water quality vault. Special inspection from the building department
is required.
The geotechnical study indicated the site's Vashon glacial till soil is not an ideal geologic feature to
accommodate infiltration. Infiltration capacity is considered extremely minimal. The geotechnical
study also provided vault design recommendations, which should be supported on competent
native soil or crushed rock placed atop competent native soil.
The sizing and design of the proposed flow control facilities would be reviewed for compliance with
the adopted 2009 King County Surface Water Design Manual and City of Renton amendments;
therefore no further mitigation is recommended.
Mitigation Measures: No further mitigation recommended
Nexus: Not Applicable
3. Vegetation
Impacts: An Arborist Report was prepared by Creative Landscape Solutions (dated July 17, 2016)
and submitted with the land use application. The proposal's infrastructure improvements and
building pad preparation will result in the removal of 48 of the subject property's 57 trees. The
applicant proposes to retain a stand of trees within a tree protection tract adjacent to the Monroe
Ave NE frontage and retain one (1) tree on proposed Lot 5 of the subdivision.
The Arborist Report and land clearing plan identifies 15 trees that are located within the proposed
residential access street and frontage improvement area along Monroe Ave NE. The report
identifies 17 trees that are referred to as "non-viable" or dangerous. Therefore, the site contains 25
significant trees after deducting the trees located with ROWs and those determined to be
dangerous.
The applicant proposes to remove 16 of the 25 significant trees on the subject property. These
trees are located in the future footprints of the single-family residences. With the exception of the
retained tree on proposed Lot 5, the remaining trees will be retained within a tree protection tract,
The proposed plan retains 36 percent of the subject property's significant trees.
The proposed tree retention exceeds the 30 percent retention requirement and nearly all of the
retained trees will be placed within a tree protection tract. The proposed new lots will each be
required to provide two (2) new trees (with the exception of Lot 5, which will retain one (1) tree)
and street trees are required in planter strips along the new residential access street and Monroe
Ave NE frontage (Exhibit 16). Additionally, trees and vegetation are proposed within the
stormwater tract and landscape tract. The applicant will be required to implement tree protection
measures for the retained trees prior to commencing land clearing activities. The City's currently
adopted tree retention and land clearing regulations would adequately mitigate for any impacts
that could result from the proposed development; therefore no further mitigation is
recommended.
Mitigation Measures: No further mitigation, recommended.
FRC REPORT 16-000413
City of Renton Deportment of Communitoconomic Development *Environmental Review Committee Report
THE PINES PRELIMINARY PLAT LUA16-
000413,ECF,PP,MOD
Report of August 29, 2016 Page 6 of 6
Nexus: Not Applicable.
4. Transportation
Impacts: A Vehicle Trip Memorandum (Exhibit 17) was prepared by Gibson Traffic Consultants
(dated July 19, 2016) and submitted with the land use application. The memorandum is based on
data obtained from the Institute of Transportation Engineers (ITE) Trip Generation Manual. The
proposed subdivision is expected to generate 114 new average daily trips with nine (9) new AM
peak hour trips and 12 new PM peak hour trips. No reduction in Level of Service for surrounding
intersections is expected.
Access to the proposed subdivision would be provided via a new full residential access street from
Monroe Ave NE. The applicant has requested two (2) modifications from the City's street standards
that include providing a hammerhead turnaround in -lieu of a cul-de-sac for a dead-end street
greater than 300 -feet and providing a shared driveway for two (2) of the proposed lots within a
preliminary plat.
The applicant has submitted a modification for required improvements along the subject property's
existing frontage of Monroe Ave NE, which is classified as a Minor Arterial Road. The applicant has
requested to maintain the existing curb line along Monroe Ave NE and provide an eight (8) foot
planter strip and five (8) foot sidewalk with a dedication of 6.5 -feet of right-of-way.
A concurrency recommendation will be provided in the staff report to Hearing Examiner based
upon the test of the citywide Transportation Plan. The development will be required to meet the
City of Renton concurrency requirements.
It is not anticipated that the proposed project would adversely impact the City's street system. The
proposal is subject to code required transportation impact fees and the construction of street
improvements; therefore no further mitigation is recommended.
Mitigation Measures: No further mitigation recommended.
Nexus: No Applicable
E. Comments of Reviewing Departments
The proposal has been circulated to City Department and Division Reviewers. Where applicable, their
comments have been incorporated into the text of this report and/or "Advisory Notes to Applicant."
✓ Copies of all Review Comments are contained in the Official File and may be attached to this
report.
The Environmental Determination decision will become final if the decision is not appealed within the
14 -day appeal period (RCW 43.21.C.075(3); WAC 197-11-680).
Environmental Determination Appeal Process: Appeals of the environmental determination must be
filed in writing together with the required fee to: Hearing Examiner, City of Renton, 1055 South Grady
Way, Renton, WA 98057, on or before 5:00 p.m. on September 16, 2016. RMC 4-8-110 governs appeals to
the Hearing Examiner and additional information regarding the appeal process may be obtained from the
City Clerk's Office, Renton City Hall — Th Floor, (425) 430-6510.
FRC REPORT 16-OW413
..v..._ o-ln•c1vl�sm���N��n!Pa �. ,a.�lni-r. ue,srwrep e��
vec�ccl nw�nr
THE PINES XXX-xXXX
U -,
drq
C � �
f�I
f �
F �O
mm gD20
h3;z� 8
z �Z
m
0
wm
Rml
Rgg�jj
II
1 xr
sl�n'3: �qtFR�
A `F 43
I
y
�6 ■
MOAN
1991!'1 9,11i
�YaIIlFF
I
I
�
I
I
U -,
drq
C � �
f�I
f �
F �O
mm gD20
h3;z� 8
z �Z
m
0
wm
Rml
Rgg�jj
II
1 xr
sl�n'3: �qtFR�
A `F 43
I
y
MOAN
1991!'1 9,11i
I
I
�
I
I
�
I
y
4
m" —'
THE PINES XXX—xxxx
.71 W
o
mw
N Z O z
?mmm
m
i'r$=
P
ZzO z .'vZ
Opa �jm
rl Om �r �N
Z
A p
Nm
0
om
mm
Z m
x
s ' o {i
e g" WD W
I
"OA090EA VA Ar+
I!
I
I!
PPw[ci wwC
THE PINES XXX—xxxx
T I r
.z
ao rnNg
Y10
/ —
4
f
a
i�5 y�Q;rn
1
a T
a
�
trn
�N
/
a}
5 —�
x
T cnm-
z
R
7
� —
!a• Y
a
t
II
T
I
j I
f
J
1 f
All
0
■R
a
R f6.
g
0
0o
�
PPw[ci wwC
THE PINES XXX—xxxx
T I r
.z
ao rnNg
Y10
4
f
i�5 y�Q;rn
1
a T
x
o 11Z
trn
�N
a}
5 —�
x
T cnm-
z
�
7
7
t
II
PPw[ci wwC
THE PINES XXX—xxxx
T I r
f
�
i
f
f
� I
t
I
I
f
I
t
II
T
I
j I
f
J
1 f
All
■R
a
R f6.
g
�
�
l
f w� axc�rr sr� a ro,x
330.H
392.iU
J97
391.45
.793 6
397.fi
J4T.Od -
9
•P-1-1�
THE PINES XXX—XXXX
easy
R
J
d
ggg
3
A
nw.c,z?.•sN'��Rwtr;n..a�,�om�.}n�cx-.nrnan�.sy 4a�ru
i
FRW Ei;Nnu'_
THE PINES
NE
�z
Mo
m
2
�
AN
ntiZM
g
�M —
oc,=-<z
S Dr�N�En
I
f
I
� f
f
�
N
I
I
i I
D oOW
I mm
m
x
7
—
Z
�
Z
F
FRW Ei;Nnu'_
THE PINES
NE
xxx—xxxx
I
f
I
� f
f
�
I
1 ff
f
I
I
i I
xxx—xxxx
THE PINES xxx—XXXX
E wY`gYY e_ Pick a4F M-1 gom l s;aij�
-------- ---- -- - ---------------------------�-__--------
_ — — — — II Y � m � — — —'— — ~- � 3N '354 30NN6/1 is : a A
I.
I I I
oo � —
p H I I
9 rn I I L I I I
f "�qp ED
to
I �
I d I
o
# u I I 1
list
h 7Ap"
4111. 31
°
00
z zr_ ac
icon Cr ,�
y io 4 V ��
8 =m�'"
Dm y
m�
O
I wm
7
7
SH
.a .q
3 v
Earth
LSolutions
MIIIIIIIIIIII
NWLLC
Geotechnical Engineering
Geology
Environmental Scientists
Construction Monitoring
Exhibit 8
-Renton 0
�—
Entire Document
Available Upon
Request
,w�
GEOTECHNICAL ENGINEERING STUDY
STINDE 13 LOT RESIDENTIAL PLAT
850 & 870
MONROE AVENUE NORTHEAST
RENTON, WASHINGTON
ES -4427
04
)5
(425) 449,-,4 .
-� ;ns% cam. -•F, .`
�.. --Rew on
Entire Document
Available Upon
Request
9 0
PREPARED FOR
Harbour Homes, LLC
April 27, 2016
-/�4y�
Brett J. Priebe, E.I.T.
Staff Engineer
........ .... . .............
'r . W _.
Stephen H. Aril
Staff,Geologist
A
y
Kyle'R.40W, P.E.
Principal
GEOTECHNICAL ENGINEERING STUDY
STINDE 13 LOT RESIDENTIAL PLAT
850 & 870 MONROE AVENUE NORTHEAST
RENTON, WASHINGTON
ES -4427
Earth Solutions NW, LLC
1805 —136th Place Northeast, Suite 201
Bellevue, Washington 98005
Phone: 425-449-4704 Fax: 425-449-4711
Toll Free: 866-336-8710
r.ewe. x., ms s k,% ren:,, ,n,...:.p,-',,,' --,—,e —7*
3
(Da
I�
rnaecr rove
THE PINES XXX-XXXX
e4lONROEAVENE,
I
I
I
II
I
I
I
7
f
I'C 1
I
, I
I I
j
IIjI
I
I
I
I
I
� !
I
,
I
q
I
I
I I
f
I
I I I I
I I I
I
I I ! i
I I I
RRA
�
444
xa�
171
0
TECHNICAL INFORMATION REPORT
for
THE PINES
PRELIMINARY PLAT
850 & 870 Monroe Avenue NE, Renton, Washington
DRS Project No. 16007
Renton File No. LUA16-000413
Owner/Applicant
Harbour Homes, LLC
400 North 34"' Street, Suite 300
Seattle, Washington 98103
Report Prepared by
D. R. STRONG Consulting Engineers, Inc.
620 Ph Avenue
Kirkland, WA 98033
(425) 827-3063
Report Issue Date
July 19, 2016
©2016 D. R. STRONG Consulting Engineers Inc.
Technical Information Report
T
Exhibit 10
enton
Entire Document
Available Upon
Request
The Pines
Renton, Washington
0
PRW— NAME
THE RNES xx
Pic_
P-
-
QI
_ 14
s
�n
fTl �
Z�
Op
Z �l
momMo
[C]]
Z02
N
osr��
m
o
CAZ
�rnzz
zz
G?.4 �m
$ gm�1w
r
1
a >
D $m�
z
0
7
e�A
0
PRW— NAME
THE RNES xx
Pic_
P-
-
0
July 17, 2016
Jamie Waltier
Chris Burrus
Harbour Homes
1441 N. 34th Street, Suite 200
Seattle, WA 98103
Site: 850 & 870 Monroe Ave NE
Renton, Ave
TPN: 0923059117 & 0923059116
Square feet: 107,157
Dear Jamie:
0 C- _- ..arc scaPI- 5c.iutions 1
85-0 &. 870 i ]o arc Avc NE. Rentom
Thank you for requesting my services. On April 26th, 2016, I visited the site located above in Renton,
WA to perform a Visual Risk Assessment (VRA) for all significant trees onsite as well as, those offsite
trees with driplines that might extend over the site. The information gathered is included in this report
and is a necessary part to be included with the proposal to short plat.
In summary:
Tree Calculations
Total number of trees
57
Trees
Total number of exempt trees ROW + Non-viable
32
Trees
Total number of viable trees
25
Trees
Total number of trees removed for construction
16
Trees
Total number of retained trees
9
Trees
Required 30% retention 25 X 30%=
1 7.5
1 Trees
I have included a detailed report of my findings. If you have any questions please call me. I can be
reached on my cell phone: 425.890.3808 or by email: sprince202(cbaol.com.
Warm regards,
Susan Prince
Creative Landscape Solutions
ISA Certified Arborist: PN #1418A
TRACE Certified Arborist: #418
17518 NE 119th Way
Redmond, WA 98052
* Per city of Renton Municipal Code, a significant tree is one whose Diameter at Breast Height (DBH) is 6" or greater
Entire Document
Available Upon
Request
Exhibit 12
0 0
Re -Align Environmental
April 21, 2016
Mr. Jamie Waltier
Harbour Homes, LLC
400 N 34th Street, Suite 300
Seattle, WA 98103
Re: Wetland Evaluation — Monroe Avenue Assemblage, Renton, WA
Dear Jamie:
This correspondence follows your request that I conduct a preliminary wetland reconnaissance on
the parcels of land (parcel Nos. 0923059116 and 0923059117), located at 850 Monroe Ave NE in
Renton, Washington The property under investigation includes two residential parcels. (See
Attached Location and Site Maps).
Data Collection
Prior to visiting the site, online information was obtained using the King County iMap system, the
US Fish and Wildlife Service online National Wetlands Inventory (NWI), and the Natural Resource
Conservation Service (MRCS) online soil mapping utility.
As shown in the Attached iMap photos, no mapped streams or wetlands are shown on the site.
Similarly, these maps show no streams or wetlands within 500 feet of the site, indicating that no
buffers from off-site critical areas would affect this parcel. The attached NWI map also depicts no
streams or wetlands on, or near the site.
Also attached is the NRCS soil report for the site. As described in the soil report, the parcels appear
to be underlain by Arents, Alderwood material, 6 to 15 percent slopes. This moderately well drained
soil is commonly found on till plains such as the Renton Highlands in which the site lies. This soil
exhibits a water table depth of 16 - 30 inches below the soil surface. This map unit is not typically
known to include hydric inclusions, which indicates that wetlands are not typically present within the
map unit.
Fieldwork
Fieldwork was conducted on March 2, 2016 using the three -parameter approach identified in the
Washington State Wletlandr Identocation and Delineation Manual (Washington Manual) (WDQE 1997) and
the Regional Supplement to the Corps of F_ngineers Wletlrand Delineation Manual. Western Mountains, Valleyr and
Coast region (Regional Supplement) (USACE 2010), which are consistent with the Army Corps of
Engineers Wetlands Delineation Manual (ACRE Manual) (Environmental Laboratory 1987) and other
pertinent federal and local guidance (33 CFR 328.3 [a] [1-5]).
During a review of the parcel boundary, I walked the perimeter of the property and found no visible
indication of drainage onto, or leaving the site. I observed that the site contains one small, very
slight, depressional area within a driveway that is approximately 30 feet wide and 30 feet long. The
depression does not drain off of the site and it appears to exist due to cam action from vehicle
— -� elton 0
Sill Granger 14056180th Ave SE Renton, WA 90 Entire Document ll@n
env.com
Available Upon 13
1 Request
0 0
Letter of Understanding of Geologic Risk
I/we understand there are inherent risks whenever soil, geologic or hydrogeologic conditions are
involved with a construction project. Soil and geologic materials, including groundwater are variable in
nature- Geologic conditions vary vertically, laterally, and seasonally. The site soil is proven to be suitable
to support foundations, landscaping, pavement, and other associated infrastructure in the area.
However, the site soil also required careful planning and consideration with respect to design and
construction.
I/we understand, accept the risk and solely responsible of developing this property,
IM
Na
ne&
M I: ' / Date: V�lli
Exhibit 14
0 0
Stinde
Construction Mitigation Description
The following narrative is provided to describe the proposed construction mitigation
measures that Harbour Homes, LLC "Harbour Homes" and the to be named general contractor
"Contractor" for Stinde will implement throughout the duration of the site development and
infrastructure period as well as during building construction.
Proposed Construction Dates (Site Work): July 2017 -February 2018
Harbour Homes anticipates on beginning clearing and site development work in the mid-
summer of 2017 depending on the timing of approvals. Harbour Homes anticipates roughly a
180 day schedule to finalize all grading, storm, sewer, water and first lift of asphalt on the site.
The goal will be to have the site completely stabilized by November 15t, 2017 before the fall.
Proposed Construction Dates (Building Construction):
Harbour Homes plans on beginning construction of a model home in April of 2018 and
anticipates starting two homes per month thereafter with an average construction timeline of
seven months to complete.
Hours & Days of Operation
Normal site hours of operation will be in compliance with the allowable working hours in the
City of Renton which are as follows:
For new single-family residences and non-residential construction, the permitted work hours are
7.00am-8:00pm Monday through Friday, 9:00am-8:00pm Saturday, and no work shall be
permitted on Sunday.
Proposed Haulina%Transportation Routes
The Stinde site is located on Monroe Avenue NE just south of 91h Street. The Contractor
anticipates utilizing one haul route to and from SR -900 (See attached Exhibit "A" for location).
Heading north on Monroe Ave NE, head west on NE 10th St to SR -900 then heading east or west
depending on the type of material import/export. -- e C
Entire Document
Measures to Minimize Impacts Available Upon
Request
Harbour Homes and the Contractor will make every effort to minimize the impacts from this
project on the surrounding neighbors, the environment and traffic circulation for the
Exhibit 151
Q
v?
1
a�ya
zm
a�
c�mm -
`�$ Y y N.,v,bc.ocN
i iz
... f timm0
q
ry �-
r
�g�
,1
m
$
THE PINES
LANDSCAPE PLAN
- --'
L �. .:
REVISIpNS___
o:
0
Co
po
LJ
N $M
4
2
4
0
line @MInst@a@ntiate a
$�a
o kikk MUMMI
Jillam ElIZ1111111 I
n'������� �
wwmw
oaoo
APP A
nnnn
WUM4
UM Mk
��i�ia€fig
mmm�m��wm
a0000aooq
r
rn
N3 N
r
=
s
THE PINES
LANDSCAPE PLAN
Lam. R ;r_:
,�
A A U
REVISEONS
•, u nn
o,..,a
�D � � =;t WES
dna
kz€
�4i--
3
y
0}
}
1
£�RE
G5 3
WUM4
UM Mk
��i�ia€fig
mmm�m��wm
a0000aooq
r
rn
N3 N
r
=
s
THE PINES
LANDSCAPE PLAN
Lam. R ;r_:
,�
A A U
REVISEONS
•, u nn
o,..,a
�D � � =;t WES
GTC
Gibson.Trafc Consultants, Inc.
MEMORANDUM
To: Chris Burrus, Harbour Homes, LLC
From: Brad Lincoln, PE Y
Project: Stinde Development
GTC #16-073 42307
Subject: Traffic Analysis
Date: July 19, 2016
This memorandum summarizes the trip generation calculations for the Stinde Development. The
development is located on the east side of Monroe Avenue NE, south of NE 10`h Street. The
development is proposed to replace two existing single-family residential units with 14 single-family
residential units, a net increase of 12 single-family residential units. A site vicinity map in included
in Figure 1.
2802 Wetmore Avenue - Suite 220 - Everett WA, 98201
Tel: 425-339-8266 - Fax: 425-258-2922 - E-mail: info@gibsontraffic.com lExhibit
1 7
ADVISORY NOTES TO APPWANT
LUA16-000413
Application Date: June 07, 2016
Name: The Pines Preliminary Plat
PLAN - Plannina Review - Land Use
+ Rento y
Site Address: 870 Monroe Ave NE
Renton, WA 98056-3859
Version 1 1
Community Services Review Comments Contact: Leslie Betlach 425-430-66191 LBetlach@rentonwa.gov
Recommendations: 2. 5 feet bicycle lanes along Monroe as per adopted Trails and Bicycle master Plan (Project sheet Page #126) are
to be included. Revise street cross section.
Recommendations: Parks Impact fee per Ordinance 5670 applies.
Review Comments Contact: Ann Fowler 1425-430-7382
Recommendations: I have reviewed the application for the The Pines Preliminary Plat at 850 & 870 Monroe Ave NE (APN(`s) 092305 9118
& 9117) and have the following comments:
EXISTING CONDITIONS
Water Water service is provided by the City of Renton. The project is within the City of Renton's water service area in the Highlands 565
hydraulic zone. There is an existing 10 inch City water main in Monroe Ave NE which can deliver 3,800 gpm, The static water pressure is
approximately 75 psi at ground elevation of 390 ft.
Sewer Wastewater service is provided by the City of Renton. There is a 12 inch wastewater main located in Monroe Ave NE and an 8 inch
wastewater main located along the east property line of 850 Monroe Ave NE.
Storm The existing properties do not contain stormwater facilities. There is an existing 24 inch stormwater main located in Monroe Ave
NE. Based on the City's flow control map, the site falls within the Peak Rate Flow Control Standard area matching Existing Site Conditions
and is within the East Lake Washington Drainage Basin.
Transportation The proposed development fronts Monroe Ave NE along the west property lines. Monroe Ave NE is classified as a Minor
Arterial Road. Existing right of way (ROW) width is approximately 60 feet.
CODE REQUIREMENTS
WATER
1. The proposed water main improvements as shown on the composite utilities civil plan submitted with the Land Use Application within
the site provides a conceptual plan for the water main extension. The development will be required to install a minimum 8 inch water main
extension into the development, connecting to the existing 10 inch water main located in Monroe Ave NE.
Staff Comments:
i. If the dwellings exceed 3,600 square feet, a minimum 10 inch water main extension, or fire sprinklers, will be required.
2. Installation of fire hydrants within 300 feet of each lot is required by Renton Fire Prevention Department. The number and location of
new hydrants will be dependent upon the finished square footage of the homes.
3. Each lot shall have a separate meter. The project proposes a 1 inch water service line and meter to each lot, for a total of fourteen (14)
new domestic water service lines and meters.
4. The development is subject to applicable water system development charges and meter installation fees based on the size of the
water meters.
a. Water system development charges for each proposed 1 inch domestic water service is $3,245.00 per meter or $45,430.00 for (14) 1
inch meters.
b. A redevelopment credit of the water system development charges in the amount of $3,245.00 will be applied to each of the two (2)
existing'/ inch meters servicing the property(ies) if they are abandoned and capped at the main line or for a total reduction of $6,490.00
for (2) % inch meters.
c. The total water SDC fee is $38,940.00 for (14) 1 inch meters including a credit of (2) % inch meters. This is payable at construction
permit issuance.
5. Water service installation charges for each proposed 1 inch water service is $2,850.00 per meter. The total water service installation
fee is $39,900.00 for (14) 1 inch meters. This is payable at construction permit issuance.
6. Drop in meter fee is $460.00 per meter. The total water drop in meter fee is $6,440.00 for (14) 1 inch meters. This is payable at
issuance of the building permit.
7. Additional water system development charges and water meter charges will apply if a landscape irrigation meter is required and is
based on the size of the meter.
SEWER
1. The proposed water main improvements as shown on the composite utilities civil plan submitted with the Land Use Application within
the site provides a conceptual plan for the sewer main extension. The development will be required to install a minimum 8 inch sewer
main extension into the development, connecting to the existing 12 inch sewer main located in Monroe Ave NE.
2. If it does not existing, an easement will be required for the sewer main existing along the east property lines.
3. All existing side sewers will be required to be cut and capped during demolition of the properties_ New side sewers shall be installed
to serve each individual property_
Ran: August 24, 2016 1 1 R I Page 1 of 4
ADVISORY NOTES TO APOCANT
LUA16-000413
CITY CF
Renton On"'
% !- _ J 1
rLNIV - r1lul1111119 I'[CVICW - LdIIU Utica VGialUll 1 1
ineerina Review Comments Contact: Ann Fowler 1425-430-7382
4. The development is proposing connection of fourteen (14) single family residences.
5. The development is subject to applicable wastewater system development charges based on the size of the new domestic water to
sere the project.
a. SDC fee for a 1 inch meter is $2,242.00 per meter. The total fee is $31,388.00 for (14) 1 inch meters.
b. A redevelopment credit of the wastewater system development charges in the amount of $2,242.00 will be applied to each of the (2)
existing meters to 850 and 870 Monroe Ave NE if they are abandoned and capped at the main line.
c. The total water SDC fee is $26,904.00. This is payable at construction permit issuance.
SURFACE WATER
1. A surface water development fee of $1,485.00 per new single family residence will apply. The project proposes the addition of 12 new
residences (14 new single family homes, 2 existing homes to be removed). The estimated total fee is $17,820.00. This is subject to final
design and payable prior to issuance of the utility construction permit.
2. A drainage report, dated July 19, 2016, was submitted by D. R. Strong Consulting Engineers, Inc. with the site plan application. The
development is subject to Full Drainage Review in accordance with the 2009 King County Surface Water Design Manual (KCSWDM) and
the City of Renton Amendments to the KCSWDM. All core and special requirements have been discussed in the provided drainage report.
3. Runoff from the existing site includes two single family residences and several outbuildings where no stormwater infrastructure
currently exists on site. Runoff from the site sheet flows west and west into a catch basin at the northwest corner of the property at 850
Monroe Ave NE. It then is conveyed through the 24 inch diameter pipe conveyance system in Monroe Ave NE, which flows south toward NE
7th Street
4. A geotechnical report, dated April 27, 2016, completed by Earth Solutions NW, LLC for the site has been provided_ The report
discusses the soil and groundwater characteristics of the site and provides recommendations for project design and construction.
Geotechnical recommendations presented in this report discount the use of full infiltration due to the underlying dense glacial till soil.
5. Stormwater Improvements to the development will consist of a public stormwater detention and water quality vault to mitigate the
added impervious areas of the development. The vault shall be designed in accordance with the KCSWDM and the City of Renton
Amendments to the manual that is current at the time of utility construction permit application. Separate structural plans will be required to
be submitted for review and approval under a separate building permit for the detention and/or water quality vault. Special inspection from
the building department is required.
6. The development is required to provide basic water quality treatment prior to discharge. Project water quality treatment will consist of
conveyance to a combined water quality/detention vault.
Staff Comments:
L The conveyance and water quality systems shall be designed in accordance with the KCSWDM and the City of Renton Amendments
to the manual that is current at the time of utility construction permit application.
ii. A maintenance access road is required to the stormwater facilities in the proposed storm tract and shall be in accordance with the
design requirements outlined in the KCSWDM.
7. No downstream flooding or erosion issues were identified in the drainage report.
TRANSPORTATION
1 _ To meet the City's complete street standards for minor arterial streets, minimum right of way width is 91 feet. Dedication of 15.5 feet of
right of way would be required_ However, the City's transportation group has determined and will support an alternate standard to match
the established standard street section for Monroe Ave NE. The City established standard street section for Monroe Ave NE, which shall be
installed by the developer as part of the proposed short plat, will allow a pavement width of 22 feet, 8 foot planting strips, 5 foot sidewalks,
and 0.5 foot curb. This recommendation results in 5.7 feet of ROW dedication. Applicant has submitted an application to the City
requesting a modification of the street frontage improvements to match this alternate street standard.
2. The development proposes installation of anew residential access road (Road A) with 26 feet of paved roadway width, 8 ft planter
strips and 5 ft sidewalks in accordance with RMC 4 6 060F.
3. Applicant has submitted an application to the City requesting a modification to provide a hammerhead turnaround has been proposed
in lieu of the required cul de sac.
Staff Comments:
I. The hammerhead turnaround shall be designed in accordance with City of Renton Fire Department standards.
ii. Emergency services access within 150 feet of all homes via a 20 foot paved roadway is required.
4. Applicant has submitted an application to the City requesting a modification to provide a shared driveways to serve as access to lots 5
and 6. Said access may be granted via the proposed shared driveway provided the shared driveway meets requirements for emergency
services access.
a. Emergency access is required within 150 feet of all points on the buildings.
b. Joint use driveways must be created upon the common property line of the properties served or through the granting of a permanent
access easement when said driveway does not exist upon a common property line.
Ran: August 24, 2016 Page 2 of 4
ADVISORY NOTES TO APPIWANT
LUA16-000413
cir. ,F --
- ento l
rL-Nw - rianning Meview - Manu use version I
Review Comments Contact: Ann Fowler 1425-430-7382
regulations. Driveways shall be designed in accordance with City standard plans 104.1
and 104.2.
6. Street lighting and street trees are required to meet current city standards_ Lighting pians were not submitted with the land use
application and will be reviewed during the construction utility permit review.
7. A traffic analysis dated July 19, 2016, was provided by Gibson Traffic Consultants, Inc_ The site generated traffic volumes were
calculated using data from the Institute of Transportation Engineers (ITE) Trip Generation Manual, 9th Edition, (2009). Based on the
calculations provided, the proposed development would average 114 new daily vehicle trips. Weekday peak hour AM trips would generate
9 new vehicle trips, with 7 vehicles leaving and 2 vehicles entering the site. Weekday peak hour PM trips would generate 12 new vehicle
trips, with 8 vehicles entering and 4 vehicles existing the site. The total peak hour trips is less than 20, therefore a traffic concurrency test is
not required. As detailed in the report the proposed project is not expected to lower the levels of service of the surrounding intersections
included in the traffic study. Increased traffic created by the development will be mitigated by payment of transportation impact fees.
8. Payment of the transportation impact fee is applicable on the construction of the development at the time of application for the building
permit. The current rate of transportation impact fee is $2,951.17 per dwelling unit for single family homes_ The project proposes the
addition of 12 new residences (14 new single family homes, 2 existing homes to be removed). The estimated total fee is $35,414.04.
Traffic impact fees will be owed at the time of building permit issuance. Fees are subject to change. The transportation impact fee that is
current at the time of building permit application will be levied.
9. Paving and trench restoration shall comply with the City's Trench Restoration and Overlay Requirements.
GENERAL COMMENTS
1. Adequate separation between utilities shall be provided in accordance with code requirements.
a. 7 ft minimum horizontal and 1 ft vertical separation between storm and other utilities is required with the exception of water lines
which require 10 ft horizontal and 1.5 ft vertical.
2. All construction utility permits for drainage and street improvements will require separate plan submittals. All utility plans shall confirm
to the Renton Drafting Standards. A licensed Civil Engineer shall prepare the civil plans.
3. A landscaping plan shall be included with the civil pian submittal. Each plan shall be on separate sheets.
4. All electrical, phone, and cable services and lines serving the proposed development must be underground. The construction of
these franchise utilities must be inspected and approved by a City of Renton inspector.
Planning Review Comments Contact: Matt Herrera 1425430-6593 1 mherrera@rentonwa.gov
Recommendations: Advisory Notes to Applicant:
1. RMC section 4 4 030_C2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise approved by the
Development Services Division.
2. Commercial, multi family, new single family and other nonresidential construction activities shall be restricted to the hours between
seven o'clock (7=00) a -m. and eight o'clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between
nine o'clock (9:00) a.m_ and eight o'clock (8:00) p.m. No work shall be permitted on Sundays_
3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an appropriate ground cover over any
portion of the site that is graded or cleared of vegetation and where no further construction work will occur within ninety (90) days.
Alternative measures such as mulch, sodding, or plastic covering as specified in the current King County Surface Water Management
Design Manual as adopted by the City of Renton may be proposed between the dates of November 1st and March 31st of each year. The
Development Services Division's approval of this work is required prior to final inspection and approval of the permit.
4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is being cleared.
6. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or fluids, operate any
equipment, install impervious surfaces, or compact the earth in any way within the area defined by the drip line of any tree to be retained.
7. The applicant shall erect and maintain six foot (6) high chain link temporary construction fencing around the drip lines of all retained
trees, or along the perimeter of a stand of retained trees. Placards shall be placed on fencing every fifty feet (50') indicating the words, "NO
TRESPASSING - Protected Trees" or on each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or
groups of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the applicant shall provide
supervision whenever equipment or trucks are moving near trees.
8. This permit is shall comply with the Bald and Golden Eagle Protection Act. The permitted is responsible for adhering to the U.S. Fish
and Wildlife Service National Bald Eagle Management Guidelines 2007 and for your U -S_ Fish and Wildlife Service permit.
Fire Review - Building Comments Contact: Corey Thomas 1425-430-70241 cthomas@rentonfa.org
Recommendations: Environmental Impact Comments:
Ran: August 24, 2016 Page 3 of 4
ADVISORY NOTES TO AP*CANT
LUA7 6-000413
PLAN - Planninq Review - Land Use
CITU GF
��RentonOw"
Version 1 1
I Fire Review - Building Comments Contact: Corey Thomas 1425-430-70241 cthomasArentonfa.ora I
1. The fire impact fees are currently applicable at the rate of $495,10 per single family unit. Credit will be granted for the removal of two
existing homes.
Code Related Comments:
I. The fire flow requirement for a single family home is 1,000 gpm minimum for dwellings up to 3,600 square feet (including garage and
basements). If the dwelling exceeds 3,600 square feet, a minimum of 1,500 gpm fire flow would be required. A minimum of one fire
hydrant is required within 300 feet of the proposed buildings and two hydrants if the fire flow goes up to 1,500 gpm. Existing hydrants can
be counted toward the requirements as long as they meet current code including 5 inch storz fittings. Add a Storz fitting to the existing
hydrant at the comer of NE 9th 5t and Monroe Ave NE.
2. Fire department apparatus access roadways are required to be a minimum of 20 feet wide fully paved, with 25 feet inside and 45 feet
outside turning radius. Fire access roadways shall be constructed to support a 30 ton vehicle with 75 psi point loading. Access is
required within 150 feet of all points on the buildings_ Full 90 foot cul de sac type turnaround is required for dead end roads that exceed
300 feet long.
3. Avariance was approved to allow a hammerhead type turnaround in lieu of the cul de sac type, with the condition that all future homes
within the plat are equipped with an approved fire sprinkler system. This condition shall be clearly stated on the face of the approved plat
Ran: August 24, 2016 Page 4 of 4
ADVISORY NOTES TO APFfCANT
LUA16-000413
Application Date: June 07, 2016
Name: The Pines Preliminary Plat
CIF, OF
.enton
Site Address: 870 Monroe Ave NE
Renton, WA 98056-3859
PLAN - Planning Review - Land Use Version 1 1 August 21, 2016
Engineering Review Comments Contact: Brianne Bannwarth 1425-430-7299 i bbannwarth a@rentonwa.gov
Recommendations: All future homes be required to have fire sprinklers providing the needed fire protection while maintaining project
viability and density. A revised paving plan shall be submitted to, and be approved by, the Plan Reviewer prior to construction permit
Ran: August 24, 2016 Page 1 of 1
0 0
Denis Law Mayor
Community & Economic Development C. E. "Chip" Vincent, Administrator
September 2, 2016
Jamie Waltier
Harbour Homes
400 N 3411 St., Ste. 300
Seattle, WA 98117
SUBJECT: ENVIRONMENTAL THRESHOLD (SEPA) DETERMINATION
The Pines Preliminary Plat, LUA16-000413, ECF, PP, MOD
Dear Mr. Waltier:
This letter is written on behalf of the Environmental Review Committee (ERC) to advise you that
they have completed their review of the subject project and have issued a threshold
Determination of Non -Significance. Please refere to the enclosed ERC Report and Decision for
more details.
Appeals of the environmental determination must be filed in writing on or before 5:00
p.m, on September 16, 2016, together with the required fee with: Hearing Examiner, City of
Renton, 1055 South Grady Way, Renton, WA 98057. Appeals to the Examiner are governed
by RMC 4-8-110 and more information regarding the appeal process may be obtained from
the Renton City Clerk's Office, (425) 430-6510.
Also, a public hearing has been scheduled by the Hearing Examiner in the Council Chambers
on the seventh floor of City Hall on September 27, 2016 at 11:00 am to consider the
Preliminary Plat and Modification. The applicant or representative(s) of the applicant is
required to be present at the public hearing. A copy of the staff recommendation will be
mailed to you prior to the hearing. If the Environmental Determination is appealed, the
appeal will be heard as part of this public hearing.
If you have any questions or desire clarification of the above, please call me at (425) 430-
6593.
1055 South Grady Way, Renton, WA 98057 • rentonwa.gov
0 0
Jamie Waltier
Page 2 of 2
September 2, 2016
For the Environmental Review Committee,
Matthew Herrera
Senior Planner
Enclosure
cc: Bevery Stinde / Owner
Maher Joudi/ Contact
H:ICEDIPIanning\Current PlanninglPRQJECTS116-000413.MattlERClDetennination.Letter.DNS_The Pines_16-
000413.doc
0
September 2, 2016
Jamie Waltier
Harbour Homes
400 N 34t11 St., Ste. 300
Seattle, WA 98117
e
Denis Law Mayor
;
Community & Economic Development C. E. "Chip" Vincent, Administrator
SUBJECT: ENVIRONMENTAL THRESHOLD (SEPA) DETERMINATION
The Pines Preliminary Plat, LUA16-000413, ECF, PP, MOD
Dear Mr. Waltier:
This letter is written on behalf of the Environmental Review Committee (ERC) to advise you that
they have completed their review of the subject project and have issued a threshold
Determination of Non -Significance. Please refere to the enclosed ERC Report and Decision for
more details.
Appeals of the environmental determination must be filed in writing on or before 5:00
p.m. on September 16, 2016, together with the required fee with: Hearing Examiner, City of
Renton, 1055 South Grady Way, Renton, WA 98057. Appeals to the Examiner are governed
by RMC 4-8-110 and more information regarding the appeal process may be obtained from
the Renton City Clerk's Office, (425) 430-6510.
Also, a public hearing has been scheduled by the Hearing Examiner in the Council Chambers
on the seventh floor of City Hall on September 27, 2016 at 11:00 am to consider the
Preliminary Plat and Modification. The applicant or representative(s) of the applicant is
required to be present at the public hearing. A copy of the staff recommendation will be
mailed to you prior to the hearing. If the Environmental Determination is appealed, the
appeal will be heard as part of this public hearing.
If you have any questions or desire clarification of the above, please tali me at (425) 430-
6593.
1055 South Grady Way, Renton, WA 98057 • rentonwa.gov
# 0
Jamie Waltier
Page 2 of 2
September 2, 2416
Forthe Environmental Review Committee,
. 14 �?
Matthew Herrera
Senior Planner
Enclosure
cc: BeveryStinde /Owner
Maher Joudi/ Contact
HACEMPlanning\Current Pianning\PROJECTS116-000413.Matt\ERC\Determi nation. Letter.DNS_The Pines_16-
000413_doc
> OF
en t
01".n
r
OF ENVIRONMENTAL DETERMINATION
ISSUANCE OF A DETERMINATION OF NONSIGNIFICANCE (DNS)
POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION
PROJECT NAME: The Pines Preliminary Plat
PROJECT NUMBER: LUA16-000413, ECF, PP, MOD
LOCATION: 850 & 870 Monroe Ave NE
DESCRIPTION: PROPOSED SUBDIVISION OF TWO (2) EXISTING SINGLE-FAMILY LOTS
INTO 14 SINGLE-FAMILY RESIDENTIAL LOTS AND THREE (3) TRACTS. THE PROJECT SITE IS LOCATED
WITHIN A RESIDENTIAL -8 (R-8) ZONING DESIGNATION. PROPOSED LOTS RANGE IN SIZE FROM 5,001
SQUARE FEET TO 5,201 SQUARE FEET THAT RESULT IN AN OVERALL NET DENSITY OF 7.53 DWELLING
UNITS PER ACRE. THE PROPOSED LOTS WILL BE ACCESSED FROM A NEW PUBLIC RESIDENTIAL ACCESS
STREET OFF MONROE AVE NE.
THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC) HAS DETERMINED THAT THE PROPOSED
ACTION DOES NOT HAVE A SIGNIFICANT ADVERSE IMPACT ON THE ENVIRONMENT.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on September
16, 2016, together with the required fee with: Hearing Examiner, City of Renton, 1055 South Grady Way,
Renton, WA 98057. Appeals to the Examiner are governed by City of RMC 4-8-110 and information
regarding the appeal process may be obtained from the Renton City Clerk's Office, (425) 430-6510.
A PUBLIC HEARING WILL BE HELD BY THE RENTON HEARING EXAMINER AT HIS REGULAR MEETING IN THE
COUNCIL CHAMBERS ON THE 7TH FLOOR OF CITY HALL, 1055 SOUTH GRADY WAY, RENTON, WASHINGTON,
ON SEPTEMBER 27, 2016 AT 11:00 AM TO CONSIDER THE PRELIMINARY PLAT. IF THE ENVIRONMENTAL
DETERMINATION IS APPEALED, THE APPEAL WILL BE HEARD AS PART OF THIS PUBLIC HEARING.
FOR FURTHER INFORMATION, PLEASE CONTACT THE CITY OF RENTON, DEPARTMENT OF
COMMUNITY & ECONOMIC DEVELOPMENT AT (425) 430-7200.
DO NOT REMOVE THIS NOTICE WITHOUT PROPER AUTHORIZATION
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION.
Brianne Bannwarth
Renton
Plan Number:
Site Address:
LUA16-000413
850 MONROE AVE NE
Plan Review Routing Slip
Name: The Pines Preliminary Plat
Description: The applicant is requesting Preliminary Plat approval and Environmental Threshold Determination (SEPA) for a
proposed 14 -lot subdivision. The project site is 108,024 square feet (2.48 acres) and located at 850 and 870 Monroe Avenue NE. The
project site is located in the Residential -8 (R-8) zoning designation. The proposed single-family residential lots range in size from 5,001
square feet to 6,696 square feet with an overall proposed density of 7.18 dwellings per acre. Two existing single-family dwellings will
be removed. Additional proposed improvements include a tree retention tract and storm drainage tract along the Monroe Ave NE
frontage. The proposed lots will be served by a new public residential access street off of Monroe Avenue NE. A hammerhead
turnaround is proposed in lieu of the code required cul-de-sac and will require approval of a modification of the City's street
standards. Proposed lots will be served by sanitary sewer and water mains that will extend from Monroe Avenue NE along the new
street. Construction of the proposed subdivision infrastructure improvements will result in approximately 1,226 cubic yards of cut and
2,207 cubic yards of fill.
Review Type: Engineering Review- Version 1
Date Assigned: 08/03/2016
Date Due: 08/17/2016
Project Manager: Matt Herrera
Submittal Notes: Qnaf rVfity' �� �''��`� k ►'" IL/ �f ✓�.1'
Street Modifications (x3)
Environmental Impact
Earth
Animals
Light/Glare
Historic/Cultural Preservation
Air
Environmental Health
Recreation
Airport Environmental
10,000 Feet
14,000 Feet
Water Energy/Natural Resources Utilities
Plants Housing Transportation
Land/Shoreline Use Aesthetics Public Service
Where to enter your comments: Manage My Reviews
Which types of comments should be entered:
Recommendation - Comments that impact the project including any of the Enivornmental Impacts above.
Correction - Corrections to the project that need to be made before the review can be completed and /or requesting submittal of
additional documentation and/or resubmittal of existing documentation.
What statuses should be used:
Reviewed - I have reviewed the project and have no comments.
Reviewed with Comments - I have reviewed the project and and I have comments entered in Recommendations.
Correction/Resubmit - I have reviewed the project and the applicant needs to submit and/or resubmit documentation and I have added
corrections in Corrections.
Signature of Director orAclthorized Representative
61,1C,
Date
Leslie Betlach CITY OF
,L1.enton 0
Pian Review Routing Slip
Plan Number: LUA16-000413 Name: The Pines Preliminary Plat
Site Address: 850 MONROE AVE NE
Description: The applicant is requesting Preliminary Plat approval and Environmental Threshold Determination (SEPA) for a
proposed 14 -lot subdivision. The project site is 108,029 square feet (2.48 acres) and located at 850 and 870 Monroe Avenue NE. The
project site is located in the Residential -8 (R-8) zoning designation. The proposed single-family residential lots range in size from 5,001
square feet to 6,696 square feet with an overall proposed density of 7.18 dwellings per acre. Two existing single-family dwellings will
be removed. Additional proposed improvements include a tree retention tract and storm drainage tract along the Monroe Ave NE
frontage. The proposed lots will be served by a new public residential access street off of Monroe Avenue NE. A hammerhead
turnaround is proposed in lieu of the code required cul-de-sac and will require approval of a modification of the City's street
standards. Proposed lots will be served by sanitary sewer and water mains that will extend from Monroe Avenue NE along the new
street. Construction of the proposed subdivision infrastructure improvements will result in approximately 1,226 cubic yards of cut and
2,207 cubic yards of fill.
Review Type:
Community Services Review- Version 1
Date Assigned:
08/01/2016
Date Due:
08/15/2016
Project Manager:
Matt Herrera
Environmental Impact
Plants Housing Transportation
Earth
Animals
Light/Glare
Historic/Cultural Preservation
Air
Environmental Health
Recreation
Airport Environmental
10,000 Feet
14,000 Feet
Water Energy/Natural Resources Utilities
Plants Housing Transportation
Land/Shoreline Use Aesthetics JPublic Service
Where to enter your comments: Manage My Reviews
Which types of comments should be entered:
Recommendation - Comments that impact the project including any of the Enivornmental Impacts above.
Correction - Corrections to the project that need to be made before the review can be completed and/or requesting submittal of
additional documentation and/or resubmittal of existing documentation .
What statuses should be used:
Reviewed - I have reviewed the project and have no comments.
Reviewed with Comments - I have reviewed the project and and I have comments entered in Recommendations.
Correction/Resubmit - I have reviewed the project and the applicant needs to submit and/or resubmit documentation and I have added
corrections in Corrections.
Signature of Director or Authorized Representative
Date
C Y OF RENT' N ........... ...F
DEPARTMEIV`I`O� COMIVI.fI'NiTY.$e.IEC,OI�.QEMIC DEVELC}PM�NT`- PUNNING-'DIVIS1,6
AFFIDAVIT < F SERVICE;BYWAILI,NG
On the 1st day of August, 2016, 1 deposited in the mails of the United States, a sealed envelope containing
Notice of Application and Acceptance documents. This information was sent to:
......:::::::.. .......................:'...., m ':_,._____., _'.'�':...'m_:.:.::::::: .....:::::_[_:_: E
I . I ...............
.....
.E E E E
:. ■�y)•'j .::E=.:E<:. ^[:.M.'Ew.m B ��EE E F E t
.::.............e.. �w»-.'tEi Et} � C �I''1�E�41#>1tIn�F E-
Agencies See Attached
Beverly Stinde Owner
Jamie Walties, Harbour Homes Applicant
Maher Joudi, DR Strong Consulting Contact
300' Surrounding Property Owners See Attached
(Signature of Sender):
STATE OF WASHINGTON )
) SS
COUNTY OF KING )
I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct,
I know or have satisfactory evidence that Sabrina Mirante
signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses and purposes
mentioned in the instrument.1►if
yLY PO ,
),, r
y���aN1N=
Dated:. b . a I t f„ �.f..I� . _ . a .�_►� �':
Notary (Print):
My appointment expires:
The Pines Preliminary Plat
LUA16-000413, ECF, PP, MOD
template - affidavit of service by mailing
NotarGPublic in and for the State
-2q ::)6C7
r wasiungron 7
7. z
�flo
rtlIIWA9\' '�S
0 0
AGENCY (DOE) LETTER MAILING
(ERC DETERMINATIONS)
Dept. of Ecology **
Dept. of Ecology **
Muckleshoot Indian Tribe Fisheries Dept. *"
Environmental Review Section
Attn: Misty Blair
Attn: Karen Walter or SEPA Reviewer
PO Box 47703
PO Box 47703
39015 —172nd Avenue SE
Olympia, WA 98504-7703
Olympia, WA 98504-7703
Auburn, WA 98092
WSDOT Northwest Region *
Duwamish Tribal Office *
Muckleshoot Cultural Resources Program **
Attn: Ramin Pazooki
4717 W Marginal Way SW
Attn: Laura Murphy
King Area Dev. Serv., MS -240
Seattle, WA 98106-1514
39015 172n4 Avenue SE
PO Box 330310
Auburn, WA 98092-9763
Seattle, WA 9813 3-97 10
US Army Corp. of Engineers *
KC Wa stewater Treatme nt Division *
Muckleshoot Cultural Resources Program **
Seattle District Office
Environmental Planning Supervisor
Attn: Erin 5laten
Attn: SEPA Reviewer
Ms. Shirley Marroquin
39015 172nd Avenue SE
PO Box C-3755
2015. Jackson ST, MS KSC-NR-050
Auburn, WA 98092-9763
Seattle, WA 98124
Seattle, WA 98104-3855
Boyd Powers ***
WDFW - Larry Fisher*
Office of Archaeology & Historic Preservation*
Depart. of Natural Resources
1775 12th Ave. NW Suite 201
Attn: Gretchen Kaehler
PO Box 47015
Issaquah, WA 98027
PO Box 48343
Olympia, WA 98504-7015
Olympia, WA 98504-8343
KC Dev. & Environmental Serv.
City of Newcastle
City of Kent
Attn: SEPA Section
Attn: Tim McHarg
Attn: Charlene Anderson, AICP, ECD
35030 SE Douglas St. #210
Director of Community Development
220 Fourth Avenue South
Snoqualmie, WA 98065
12835 Newcastle Way, Ste 200
Kent, WA 98032-5895
Newcastle, WA 98056
Metro Transit
Puget Sound Energy
City of Tukwila
Senior Environmental Planner
Wendy Weiker, Community Svcs. Mgr.
Jack Pace, Responsible Official
Gary Kriedt
355 110'" Ave NE
6200 Southcenter Blvd.
201 South Jackson Street KSC-TR-0431
Mailstop EST 11W
Tukwila, WA 98188
Seattle, WA 98104-3856
Bellevue, WA 98004
Seattle Public Utilities
Puget Sound Energy
Jalaine Madura,
Doug Corbin, Municipal Liaison Mgr.
Attn: SEPA Responsible Official
6905 South 2281h St
700 Fifth Avenue, Suite 4900
Kent, WA 98032
PO Box 34018
Seattle, WA 98124-4018
*Note: If the Notice of Application states that it is an "Optional DNS", the marked agencies and cities
will need to be sent a copy of the Environmental Checklist, Site Plan PMT, and the Notice of
Application.
**Department of Ecology is emailed a copy of the Environmental Checklist, Site Plan PMT, & Notice to
the following email address: se aunit ec .wa. ov
** Karen Walter, Laura Murphy and Erin Slaten with the Muckleshoot Indian Tribe Fisheries Dept. are
emailed a copy of the Environmental Checklist, Site Plan PMT, & Notice to the following email
addresses: KWalter@muckleshoot.nsn.us / Laura.murphy@muckleshoot.nsn.us z
e ri n.slaten @ muckles hoot. nsn. us
***Department of Natural Resources is emailed a copy of the Environmental Checklist, Site Plan PMT,
& Notice the following email address: sepacenter@dnr.wa.eov
template - affidavit of service by mailing
Beverly Stinde Beverly Stinde Jamie Waltier
19807 SE 300th St 19807 SE 300th St Harbour Homes, LLC
Kent, WA 98042 Kent, WA 98042 1441 N 34th St, 200
Seattle, WA 98103
Maher Joudi
D.R. Strong Consulting Engineers
620 7th Ave
Kirkland, WA 98033
0 0
423000170 7809000030 424500080
HE XINYING HENDERSON CHARLENE R IP CHING SANG+HANG LIN WONG
5312 NE 2ND CT 852 LYNNWOOD AVE NE 819 NEWPORT CT NE
RENTON, WA 98059 RENTON, WA 98056 RENTON, WA 98056
923059166 423000130 424500070
KING MICHAEL DAVID KINNEY PAUL W KREICK JOY A & CONRAD R
816 MONROE AVE NE 850 OLYMPIA AVE NE 5511 NE 2ND ST
RENTON, WA 98056 RENTON, WA 98056 RENTON, WA 98059
425000255 7809200040 7809000020
LAMP CHRISTIAN K+JOANNA V M LAVALETTE MAYA R LEONEN EDWIN
3513 NE 9TH ST PO BOX 994 914 LYNNWOOD AVE NE
RENTON, WA 98056 RENTON, WA 98057 RENTON, WA 98056
424500050 7809200015 424000105
LOZADA JUAN C MACOMBER STEPHEN MAXWELL JOAN C
815 OLYMPIA AV NE 909 MONROE AVE NE 871 OLYMPIA AVE NE
RENTON, WA 98056 RENTON, WA 98055 RENTON, WA 98056
923059208 7809000040 7809200050
MENGES KEITH MONDEJA-RODRIGUEZ ROLANDO+A MOV KONICA
2124 NE 16TH ST 842 LYNNWOOD AVE NE 851 MONROE AVE NE
RENTON, WA 98056 RENTON, WA 98056 RENTON, WA 98056
423000115 424500020 424000135
NAKAMURA VAN I+ALICE M NG AUSTIN NGO HUNG V++MAI T HUYNH
862 OLYMPIA AVE NE 6622 S 124TH ST 3313 NE 9TH ST
RENTON, WA 98056 SEATTLE, WA 98178 RENTON, WA 98056
7809000050 424500015 423000110
NGO TAI NIX E G PAYE TRACYE JO
367 EDMONDS AVE SE 3413 N E STH ST 866 OLYMPIA AVE NE
RENTON, WA 98056 RENTON, WA 98055 RENTON, WA 98056
424000055 7809200030 425000250
PEREZ JUVENAL+ALEJANDRO PHUNG HUY QUOC+NGUYEN BICH PISKOV KRASIMIR M+SVELTIA
910 MONROE AV NE 867 MONROE AVE NE 13410 SE 171ST PL
RENTON, WA 98056 RENTON, WA 98056 RENTON, WA 98058
424000080 423000190 424000130
POE LEAH QUINTUS PAUL L+LESLIE RADII ADAM F
3324 NE 9TH ST 863 OLMPIA AVE NE 3319 NE 9TH ST
RENTON, WA 98056 RENTON, WA 98056 RENTON, WA 98056
423000160 424000060 7809200035
RAE KATHLEEN L REICHOW FAMILY LLC ROUNTREE REKEDA L+THOMAS
851 PIERCE AVE NE 26409 148TH AVE 5E 863 MONROE AVE NE
RENTON, WA 98056 KENT, WA 98042 RENTON, WA 98056
0 0
424000070 423000155 424000140
ROY ELMER J SABINE LAWRENCE R SECRETARY OF HOUSING & URBA
3312 NE 9TH ST 811 PIERCE AVE NE 34 CIVIC CENTER PL #7015
RENTON, WA 98056 RENTON, WA 98056 SANTA ANA, CA 92701
424500096 423000175 424500055
SHERRARD RONALD D SIT KAREN SMITH WALTER+MILLICENTJ
3318 NE 8TH ST 3422 241ST AVE SE 811 OLYMPIA AVE
RENTON, WA 98056 ISSAQUAH, WA 98029 RENTON, WA 98056
424000090 424500075 923059116
SPENCER WILLIAM B+LOAN T SPOON MARILYN R STINDE BEVERLY
3406 NE 9TH ST 820 NEWPORT CT NE 19807 SE 300TH ST
RENTON, WA 98056 RENTON, WA 98056 KENT, WA 98042
923059117 423000185 7809000035
STINDE BEVERLY SYKES JUNE TRAN ANH HONG
19807 SE 300TH ST 867 OLYMPIA AVE NE 848 LYNNWOOD AVE NE
KENT, WA 98042 RENTON, WA 98056 RENTON, WA 98056
424000120 923059134 423000195
TRAN LIEN+NGO DUC TRAN OANH+CUONG ON TRUONG PHUOC+NGUYEN LOAN
513 QUEEN AVE NE 822 MONROE AVE NE 859 OLYMPIA AV NE
RENTON, WA 98056 RENTON, WA 98056 RENTON, WA 98056
923059138 7809200045 424000131
VANDERLAAN BRUCE+HUSTON KIM VLAHOVICH COLLEEN A WELCH ARABEL G
820 MONROE AVE NE 855 MONROE AVE NE 119 140TH ST SE
RENTON, WA 98056 RENTON, WA 98056 EVERETT, WA 98208
424000100 923059168 7809000045
WEST -JOHNSON MIRIAM MARIE WOO VICTOR Y WU CLARA CHUN+HON KEUNG WU
903 OLYMPIA AVE NE 808 MONROE AV NE 838 LYNNWOOD AVE NE
RENTON, WA 98056 RENTON, WA 98056 RENTON, WA 98056
7809200025 7809200055 424000095
WU 01 XIAN+XIU LAN CAO ZINOVYEV ROMAN ZOLLER KIMBERLY
10621 RENTON AVE 5 823 MONROE AVE NE 3412 NE 9TH ST
SEATTLE, WA 98178 RENTON, WA 98056 RENTON, WA 98056
424000150
ZUGSCHWERDT LINDA L
880 MONROE AV NE
RENTON, WA 98056
425000245
BENNETT ANDREA K
3501 NE 9TH ST
RENTON, WA 98056
425000195
BLAYLOCK_FRANCES M
3500 NE 9TH ST
RENTON, WA 98055
423000165
CAMPBELL WILLIAM R+LAVONNE
855 PIERCE AVE NE
RENTON, WA 98056
424000115
DAM THEM+HOI LE
3407 NE 9TH ST
RENTON, WA 98056
423000200
ENDICOTT GORDON L+KLARA M
855 OLYMPIA AVE NE
RENTON, WA 98056
424000065
FIVEASH JOHN C
3306 NE 9TH ST
RENTON, WA 98056
423000140 424500090
BERKEBILE PETER R+MILDRED L BITNEY-WILSON JONELL&FARREL
804 OLYMPIA AVE NE 4063 WILLIAMS AVE N
RENTON, WA 98056 RENTON, WA 98056
424000110
BLINSTRUB ERIC J
3413 NE 9TH ST
RENTON, WA 98056
424500060
CLUPHF JASON N
3424 NE 8TH ST
RENTON, WA 98056
424500010
DAYTONB LLC
554 ROSARIO AVE SE
RENTON, WA 98059
7809000025
EWERSTAMMY
908 LYNNWOOD AVE
RENTON, WA 98056
7809200065
FUENTES EUFEMIA SORTO+KARLA
809 MONROE AV NE
RENTON, WA 98056
424500095
BROMILEY STANLEY R
3322 NE 8TH ST
RENTON, WA 98056
423000120
CROSS FAMILY TRUST C/O THOM
1842 W 15TH LN
APACHE JUNCTION, AZ 85220
423000145
DELATORRE JUAN
3510 NE 8TH ST
RENTON, WA 98056
424500065
FERNANDEZ NESTOR Y
804 NEWPORT CT NE
RENTON, WA 98056
7809200020
GONZALEZ LUIS ANTONIO GUAPI
15220 NE 16TH PL #40
BELLEVUE, WA 98007
423000180 424000145 424500025
GREGG WILLIAM D H & A LLC HA KIM CHI THI+LE THUY HA
867 PIERCE AVENUE NORTHEAST 4707 NE 2ND ST 253 NILE AVE NE
RENTON, WA 98056 RENTON, WA 98059 RENTON, WA 98059
0
7809200060
2014-3 IN BORROWER LP
1717 MAIN STREET STE 2000
DALLAS, TX 75201
424000085
ANGOVE RANDY+PATRICIA A
3400 NE 9TH ST
RENTON, WA 98056
424000075
ADAMS MARY J
3318 NE 9TH ST
RENTON, WA 98055
424500085
AQUINO JONATHAN O
813 NEWPORT CR NE
RENTON, WA 98056
0
424500045
AGUIRRE CANDIDO T
851 OLYMPIA AVE NE
RENTON, WA 98056
423000125
AVELAR ERNESTO M+KARIN S
854 OLYMPIA AV NE
RENTON, WA 98056
7809000055 423000135 424000125
BAADE EUGENE W+JOYCE M BAUSCH MICHAEL W+KELLI A BEANIES LAZARO
824 LYNNWOOD AVE NE 810 OLYMPIA AVE NE 3325 NE 9TH ST
RENTON, WA 98056 RENTON, WA 98056 RENTON, WA 98056
NOTICE OF APPLICATION AND PROPOSED DETERMINATION OF
NON -SIGNIFICANCE fDNS)
AMnI.r AP1`1Q"nh.shq.nfliedand.matedwN dl.0,Ma mtof Commurrtly&EWmank Onr.bpmenl
law-PlgnnlnR DleNlpn of the Cltyil RITh. fedoednrbdeey dexdbes dse .PPIlabas .nd In. necpp.ry
Puhlk ApPrme1.
VATEOFNOTIMOFAPPUUTION, August 1, 2016
LANOUSENUMEER; E UAI9-000d13, Ecr, Pp, MOO
PROJECT NAME: The Plrn. Pmlhnlnarr P lat
PROIELTOESERIMON: The .PRlmm is raqulfHr7 Pndlm1M,,i PW a
ThnsheW Dnermh nqn ISEPNford Prpposed Lia -la Ws IVUJ,M Thrpmlettsll. I. 109,IR9 s�nuarchetf2.98 axra aM
lora rad of 630 ar1tl BTO Minn. Avenue
prop`F- Tha PmOC"Ite b both in Nr AefltlelM'al4i (A�11) iwynr dClgn.Von. The
metl dnpe.Pandly mPldentlW Loh ranee In sh. Aran 5, Wl squsm feetm 6.6%equare feel with in annll prepwed
density if 7.15 dwNll�ga pr arrf, Two edNlrrd shtld"r. * dwelpnRs wll M remoaed, gddfhorpl pripm.tl
ImPr enld W", a hme re[enllpn Iran and re difrtT lraq aby the %—Are E'fr Ate:; The prvpor J
his MPI be -rd by • n.w public nfltlfntlal aaefs fVeet iN df Z1— Ay , NE A hammiinnm tsanevend h
proparMVn I'reu of the Wdemq IrW.tles.candwIM ngalr!appranl ofa mpolRmdpn pf M e CAlydatreer SLilldarth.
ropmed lob wiN ha fen.tl br sanihIli-
-..t
s.wr and w.ter maln.ytn MII utend frgm M[nne Avenue NE abnR tlse naw
rat fdargnrllpn el the ,,aid, d suddlNdpn brrafWchre Imprvnmenrs will nsuh In apprmhnat.IV 3,226 [u Mc
yards of nr arN 2,167 c4hk yardr of RLI,
PROJECT LOCATION: ISO & 1170 M._ A. HE
OPTIONAL OETEAMMAIION OF NON3M7i1FICAlICE (,NSI: As th. Lead AReny, the Chyef Renton has deteminetl Mat
signidont en.innmmeal Impxb an vnllkety Lo rewb from the pnpmad prplecb nh.nfpn, aP permhLed UM.r tlse
RCN 43.210110, the pay of Remen is uslgR Me OPtlonel DNS prvuse to Sin rwdW [hate ON$ h Ilhely au ba bsu.d.
CommantPeiods Por the pmkrt and the pr,M W ONS an Imggrattd heti a single mmm.nr perlotl..'" wN .. rm
CGmmerd paned filhnelngtheIsau of baa ThmshgldD till ymtb, qr Ifun,3ti_ad IIJP_i,ismry brtlaeonly
iPPgmunlry to mmmerd pn xh. erwirpnmenmllmpaaS of the PriPnral. A 14day appeal wilod will blrpw the ifwanre
efthe ONS
PERMU APPLICATION DATE lune 7,2016
NOT1R OF I:OMP11?rE APPUCATrONI AUguW 1,1016
APPUCAMJPRoX= CDNTACT FEASONI lamb Miller, Nirb— Nmre ii =N Sae SE, She 300/Semis, WA
96103/20g -3U5$ Iv 1w 111envwbiurmnae,,—
PlrmNsyRerleW RerYtfnpetl: Fnrlrpenenraf ISFrAI AeWpw, PnOMrgry Ptak Modilluaan
ONerp.nrdbwhkh mry be regbke+. &slldlryPmmlCCinffrvadon P.lmN
Regnrnd Sledla 4rb.drt Re"M Oningry
Report, 6eoerdinwf erpr; TraNk Impao
Lira Non when.PRkdde nay Sbbmmy Wetlantl Assessmrq
he reWew.d; OeperemfM d eonneii. {Ecgnnmk
OMrlen, 51a11a ROor Dn'diI,H nett lEEDJ-Reming
Rermou Gry N.R, 11055 Swdh
4W57Brady W", Aq ,WA
ifyqu wiuld likeIe be madea ParxYW record linaWpfurtherhbrmatknmthis;ai .dpmjem,Cumplehrhi Iiw
and return m_Cily of Rennin. CE0-PNnning Dlrislpn. 10555q,GndyWey, Ilmlon, Wq 99037.
Nam!/Fik No.: Thr W nn PrNiminary plat I LVAl6-0DOg13, E[F, Pp, MOD
NAME
MAdUNG q : Cityr3or.1➢p:�—
TELERHONE Na;NQ:
PVBU[REAIfING; P�bll�h Fnryjslernew le h tl letlf r5_eylgmher 2] 20166 I lh
Ren He Nn n
�gwi_HF�23.m�'Cln gerr9q Cevnnl Gamhe;f a[ 11:[q em Cn [he Ah
rv« if Rempn ❑Ir nau rgalea at 1Dss sewn ,rear wee.
COWMNCr QYEWEW:
lenlnE/[and Wei the fuhjen sit.hd.sli-iii COMMMO en the Ory gfR.nlin Cpmpmhprsiae
land Use Map end"an the L'm/S ZenlnR MeP,
Envlmnmennei 0—mentathat
zzni.
Ptdp... d PrelacC FRNrmmemd ISPRAI CIPed1ISE
0 ... IvPmenr Rf9u1mgm .,/
Used FirN HdI MItI 6m: The landimwillhis fvbjnt to the C'r3 SERA irdininre, RMCa-JIDA;4i;4-F
D.iG; A -7;a9 and ilherippl:rahh oatlu and sg,j, dns of ippmpda
Camnwn0. the .I — iPPII e"- must be nba Hod in Wrldnr ti M.tt H.—re Serdii plainer, co - r.nrdag
ume..' 1ms SQIItFP Grade 1, Rmtm, we 98m,br 3:W PM en AUSwt ls,1036. ed. malar if A.1mglNWY
srhedded bIJ pubk hepjat W SePWmbe, iT,
at LIM am, EqurlCR Chamber, sinw th rwr, RI Chy Half,
3055 S,vth Grady Way, Rennin. PM an inherpfted Pn aRlId Nig the head,& please mnhe nq pgnd,l OWNIM W
wee that the he.n" hm nqt been reagl.duled at H261 p30-6576. Fdleuintthe luuanG of the SEPA Del.rmfm lhn,
You maY sdll .ppear m[he hearin[aPq present Va— mmmenb mgardln. Use P.an.I befnn the HW,g Eaaminer. r
you hne queslulnf abputthie pmpdsW,irwlfn Ip b. made. platy if r.mNPM Mem .ddlddnal lnfprm.dgn hymal{
p e.se mnM[1 Ne P'ofM man+Rr. Amnne wM whmAs written mmmfnb wRlaubmedoly benne a Partyal rand
and will M mtlR W M arty deddon in this pnlecc
CONTACT PERSON; Matt Herrera, Senior Planner; Tel: (425) 43"593;
Ecol: mherrera@rentenwo.gov
PLEASE INCLUDE THE PROJECT NUMBER W HEN CALLING FOR PROPER FILE 1D1NTIFICAn0N
CERTIFICATION
A Mr
i, 1{ hereby certify that �_ copies of the above document
were posted in conspicuous places or nearby the described property on
Date:-�kW a..., 1 k tot Lo Signed:
�IjSTATE OF WASHINGTON )
SS
COUNTY OF KING
I certify that I know or have satisfactory evidence that fno-"t-tp Herr -rrh
signed this instrument and acknowledged it to be his/her/their free and voluntary act for the
uses and purposes mentioned in the instrument.
�yioti,,,IJc�,p4� Notary P
�,�ar'4 til Ii
TA+� ' Notary (Print)
" r
MY appointment expires
�4qutiHw��` �X4� � -
�`FieA N'.``�`�
is in and for the State of Washington
41i
0
August 1, 2016
Jamie Waltier
Harbour Homes
400 N. 3411 St., Ste. 300
Seattle, WA 98103
e
Denis Law Mayor I .R
Community & Economic Development C. E. "Chip" Vincent, Administrator
SUBJECT: "Off Hold" Notice
The Pines Preliminary Plat/ LUA16-000413, ECF, PP, MOD
Dear Mr. Waltier:
Thank you for submitting the additional materials requested in the June 15, 2016 letter from
the City. Your project has been taken off hold and the City will continue review of The Pines
Preliminary Plat project.
The Preliminary Plat has been rescheduled for Environmental Review Committee consideration
on August 29, 2016 and is tentatively scheduled to go before the Hearing Examiner on
September 27 at 11:00 a.m. If you have any questions, please contact me at (425) 430-6593.
Sincerely,
r�
kil
• w �
Matthew Herrera, AICP
Senior Planner
cc: Yoshio Piediscalzi, D.R. Strong Consulting Engineers, 620 71h Ave., Kirkland, WA 98033 / Applicant
Ann Fowler, Civil Engineer II
Corey Thomas, Renton Fire Plan Review
HACEDTlanning\Current PlanninglPROJECTS116-000413.MattlOffhold Letter. doex
1055 South Grady Way, Renton, WA 98057 • rentonwa.gov
CITY O
NOTICE OF APPLICATION AND PROPOSED DETERMINATION OF
NON -SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic Development
(CED) — Planning Division of the City of Renton. The following briefly describes the application and the necessary
Public Approvals.
DATE OF NOTICE OF APPLICATION
LAND USE NUMBER:
PROJECT NAME -
August 1, 2016
LUA16-000413, ECF, PP, MOD
The Pines Preliminary Plat
PROJECT DESCRIPTION: The applicant is requesting Preliminary Plat approval and Environmental
Threshold Determination (SEPA) for a proposed 14 -lot subdivision. The project site is 108,029 square feet (2.48 acres) and
located at 850 and 870 Monroe Avenue NE. The project site is located in the Residential -8 (R-8) zoning designation. The
proposed single-family residential lots range in size from 5,001 square feet to 5,596 square feet with an overall proposed
density of 7.18 dwellings per acre. Two existing single-family dwellings will be removed. Additional proposed
improvements include a tree retention tract and storm drainage tract along the Monroe Ave NE frontage. The proposed
lots will be served by a new public residential access street off of Monroe Avenue NE. A hammerhead turnaround is
proposed in lieu of the code required cul-de-sac and will require approval of a modification of the City's street standards.
Proposed lots will be served by sanitary sewer and water mains that will extend from Monroe Avenue NE along the new
street. Construction of the proposed subdivision infrastructure improvements will result in approximately 1,226 cubic
yards of cut and 2,207 cubic yards of fill.
PROJECT LOCATION: 850 & 870 Monroe Ave NE
OPTIONAL DETERMINATION OF NON -SIGNIFICANCE (DNS),. As the Lead Agency, the City of Renton has determined that
significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the
RCW 43.210.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued.
Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no
comment period following the issuance of the Threshold Determination of Non -Significance (DNS). This may be the only
opportunity to comment on the environmental impacts of the proposal. A 14 -day appeal period will follow the issuance
of the DNS.
PERMIT APPLICATION DATE: June 7, 2016
NOTICE OF COMPLETE APPLICATION: August 1, 2016
APPLICANT/PROJECT CONTACT PERSON: Jamie Waltier, Harbour Homes/ 400 N 341 St., Ste 300/Seattle, WA
98103/ 206-315-8130/jwaltier@)harbourhome5.com
Permits/Review Requested: Environmental (SEPA) Review, Preliminary Plat, Modification
Other Permits which may he required: Building Permit, Construction Permit
Requested Studies: Arborist Report, Drainage Report, Geotechnical Report, Traffic Impact
Statement, Wetland Assessment
Location where application may
be reviewed: Department of Community & Economic Development (CED) — Planning
Division, Sixth Floor Renton City Hall, 1055 South Grady Way, Renton, WA
98057
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED — Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: The Pines Preliminary Plat/ LUA16-000413, ECF, PP, MOD
NAME:
MAILING ADDRESS: City/State/Zip:
TELEPHONE NO.:
PUBLIC HEARING: 0 Public hearing is tentatively scheduled for3Efptember 27, 2016 before the
Renton Hearing Examiner in Renton Council Chambers at 11:00 am on the 7th
floor of Renton City Hall located at 1055 South Grady Way.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated COMP-RMD on the City of Renton Comprehensive
Land Use Map and R-8 on the City's Zoning Map.
Environmental Documents that
Evaluate the Proposed Project: Environmental (SEPA) Checklist
Development Regulations
Used For Project Mitigation: The project will be subject to the City's SEPA ordinance, RMC 4-2-110A; 4.4; 4-6-
060; 4-7; 4-9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Matt Herrera, Senior Planner, CED — Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on August 15, 2016. This matter Is also tentatively
scheduled for a public hearing on September 27, 2016, at 11:00 am, Council Chambers, Seventh Floor, Renton City Hall,
1055 South Grady Way, Renton. If you are interested in attending the hearing, please contact the Planning Division to
ensure that the hearing has not been rescheduled at (425) 430-6578. Following the issuance of the SEPA Determination,
you may stili appear at the hearing and present your comments regarding the proposal before the Hearing Examiner. If
you have questions about this proposal, or wish to be made a party of record and receive additional information by mail,
please contact the project manager. Anyone who submits written comments will automatically become a party of record
and will be notified of any decision on this project.
CONTACT PERSON: Matt Herrera, Senior Planner; Tel: (425) 430-6593;
Eml: mherrera@rentonwa-goy
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION
JML
Denis Law 0 —
City of,
Mayor � ,i h. Y _ �.�, ��
Community & Economic Development Department
June 15, 2016 C.E."Chip"Vin cent, Administrator
Jamie Waltier
Harbour Homes
400 N. 34th St., Ste. 300
Seattle, WA 98103
Subject: Notice of Complete Application and "On Hold" Notice
The Pines Preliminary Plat / LUA16-000413, ECF, PP, MOD
Dear Mr. Waltier:
The Planning Division of the City of Renton has determined that the subject application
is complete according to submittal requirements and, therefore, is accepted for review.
However, during our review, staff has determined that additional information is
necessary in order to proceed further.
The following information will need to be submitted before September 13, 2016 so that
we may begin processing and continue the review of the above subject application:
• The plat layout does not reflect comments provided following the preapplication
meeting, specifically, the hammerhead dead end. The hammerhead dead end
acts as a private driveway (see Renton Municipal Code (RMC) 4-6-060J1b) and
does not provide street frontage for four (4) of the 14 proposed lots. This layout
also results in proposed lots 6 and 9 to not meet lot width requirements (see
RMC 4-7-170D). Further, Residential -8 zones allow narrower lot dimensions that
reflect the zone's alley access preference and reduction of street side curb cuts
(see RMC 4-7-150E5). No attempt at rear lot access is provided for any of the
proposed lots. The modification for a hammerhead turnaround will not be
recommended for approval without changes to the layout that reflect the above.
o Please provide 12 updated copies of the following: Narrative; Density
Worksheet; and Plan Sheets. Please provide five (5) copies of the
updated TIR and modification request. Please provide one copy of the
updated color plots.
• The Gibson Traffic Consultants traffic analysis is for 13 single family residences.
Please provide five (5) copies of the updated traffic analysis that reflects the 14
single-family residential units proposed in the plat.
Renton City Hall . 1055 South Grady Way • Renton, Washington 98057 . rentonwa.gov
• Please update landscape plan to include at least two (2) significant trees for each
newly created lot as required by RMC 4-44300d.
• Please provide authorization from the property owner for Jamie Waltier's
signature on the master application.
• Please provide the above referenced resubmittal documents in digital form via
disc or zip drive.
• The street modification currently contains two (2) requests. One (1) for the
Monroe Ave. NE frontage improvements and one (1) for the hammerhead
turnaround. Each modification is a separate fee and only one (1) modification
payment was made at intake. Please provide the modification fee(s) when
resubmitting documents. Modifications are $150.00 per modification plus a 3
percent technology fee.
At this time, your project has been placed "on hold" pending receipt of the requested
information. Please contact me at (425) 430-6593 if you have any questions.
Sincerel
Matthew Herrera, AICP
Senior Planner
cc: Yoshio Plediscalzi, D.R. Strong Consulting Engineers, 520 Th Ave., Kirkland, WA 98033 / Applicant
Ann Fowler, Civil Engineer 11
Corey Thomas, Renton Fire Plan Review
H:\CED\Planning\Current Planning\PROJECTS\16-000413.Matt\Acceptance-Onhold Letter.docx
F
Beverly Stinde Beverly Stinde Jamie Waltier
19807 SE 300th St 19807 SE 300th St Harbour Hames, LLC
(Cent, WA 98042 Kent, WA 98042 1441 N 34th St, 200
Seattle, WA 98103
Maher Joudi
D.R. Strong Consulting Engineers
620 7th Ave
Kirkland, WA 98033
40 _., _-��_
DEPARTMENT OF COM NITY CITY OF
AND ECONOMIC DEVELOPMENTRenton = }
Planning Division
LAND USE PERMIT MASTER APPLICATION
PROPERTY OWNER(S)
NAME:
Beverly Stinde
ADDRESS:
850 Monroe Ave NE
CITY: ZIP:
Renton 98056
TELEPHONE NUMBER:
(206) 315-8130
APPLICANT of other than owner)
NAME:
Harbour Homes, LLC
COMPANY (if applicable):
Same
ADDRESS:
400 N. 34" St., STE 300
CITY: ZIP:
Seattle 98103
TELEPHONE NUMBER,
206 315-8130
CONTACT PERSON
NAME:
Jamie Waltier
COMPANY (if applicable):
Harbour Homes, LLC
ADDRESS:
400 N. 34`x' St., STE 300
CITY: ZIP:
Seattle 98103
TELEPHONE NUMBER AND EMAIL ADDRESS:
(206) 315-8130
jwaltier@harbourhomes,com
PROJECT INFORMATION
PROJECT OR DEVELOPMENT NAME:
The Pines Preliminary Plat
PROJECT/ADDRESS(S)/LOCATION AND ZIP CODE:
850 Monroe Ave NE
Renton, WA 98056
KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S):
0923059116
0923059117
EXISTING LAND USE(S): Single Family
PROPOSED LAND USE(S): Single Family
EXISTING COMPREHENSIVE PLAN MAP DESIGNATION:
Residential Medium Density
PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION
(if applicable) Residential Medium Density
EXISTING ZONING: R-8
PROPOSED ZONING (if applicable): R-8
SITE AREA (in square feet): 107,969
SQUARE FOOTAGE OF PUBLIC ROADWAYS TO BE
DEDICATED: 23,140
SQUARE FOOTAGE OF PRIVATE ACCESS EASEMENTS:
0
PROPOSED RESIDENTIAL DENSITY IN UNITS PER NET
ACRE (if applicable) R-8
NUMBER OF PROPOSED LOTS (if applicable)
14
NUMBER OF NEW DWELLING UNITS (if applicable):
14
):\Land Acquisition\Projects\5tinde\Prelirninary Plat\Land Use Application_doc Rev: 08/2015
IROJECT INFORMATION co inr`
NUMBER OF EXISTING DWELLING UNITS (if applicable): PROJECT VALUE:
2 $3,360,000
SQUARE FOOTAGE OF PROPOSED RESIDENTIAL
BUILDINGS (if applicable): Up to 2600 sq. ft. each
SQUARE FOOTAGE OF EXISTING RESIDENTIAL
BUILDINGS TO REMAIN (if applicable): 0
SQUARE FOOTAGE OF PROPOSED NON-RESIDENTIAL
BUILDINGS (if applicable): 0
SQUARE FOOTAGE OF EXISTING NON-RESIDENTIAL
BUILDINGS TO REMAIN (if applicable): 0
NET FLOOR AREA ON NON-RESIDENTIAL BUILDINGS (if
applicable): 0
NUMBER OF EMPLOYEES TO BE EMPLOYED BY THE NEW
PROJECT (if applicable): 0
IS THE SITE LOCATED IN ANY TYPE OF
ENVIRONMENTALLY CRITICAL AREA, PLEASE INCLUDE
SQUARE FOOTAGE (if applicable):
❑ AQUIFIER PROTECTION AREA ONE
❑ AQUIFIER PROTECTION AREA TWO
❑
FLOOD HAZARD AREA
sq. ft.
❑
GEOLOGIC HAZARD
sq. ft.
❑
HABITAT CONSERVATION
sq. ft.
❑ SHORELINE STREAMS & LAKES sq. ft.
❑ WETLANDS sq. ft.
LEGAL DESCRIPTION OF PROPERTY I
(Attach legal description on separate sheet with the followinla information included)
SITUATE IN THE NE QUARTER OF SECTION 09, TOWNSHIP 23N, RANGE 05E, IN THE CITY OF
RENTON, KING COUNTY, WASHINGTON
AFFIDAVIT OF OWNERSHIP
I, (Print Name/s) Jamie Waltier, declare under penalty of perjury under the laws of the State of Washington that I am (please check one)
❑ the current owner of the property involved in this application or ® the authorized representative to act for a corporation (please
attach proof of authorization) and t a the foregoing statements and answers herein contained and the information herewith are in all
resp_e t true and correct to,the I t4f my knowledge and belief.
Sign` r(yof Owner[F*;_preseniatio Date Signature of Owner/Representative Date
ST*TE OF WASHINGTON )
) SS
COUNTY OF KING )
I certify that I know or have satisfactory evidence that 3 a.m � e W, I t , z r 'signed this instrument and
acknowledge it to be his/her/their free and voluntary act for the uses and purpose mentioned in the instrument.
I/L'�/7o
Dated
�
#p`ill B�g RR ',
* slow
PUBLIC
28A=N�► :'s'c� a'`�' phi
.O
Notary Public in and for the State of Washington
Chr;i S"'
Notary (Print):
My appointment expires: I- Z8 - ? c � R
2
J:\Land Acquisition\Projects\SYi" a'dM 1 liminary Plat\Land Use Application.doc Rev: 08/2015
til _r,
DEPARTMENT OF COMONITY C
AND ECONOMIC DEVELOPMENT C ,•
WAIVER OF SUBMITTAL REQUIREMENTS
FOR LAND USE APPLICATIONS
Planning Division
1055 South Grady Way -Renton, WA 98057
Phone: 425-430-7200 Fax: 425-430-7231
LAND USE PERMIT SUBMITTAL REQUIREMENTS:
WAIVED
BY:
MODIFIED
BY:
COMMENTS:
Arborist Report 4
Architectural Elevations 3AND 4
Biological Assessment 4
Calculations 1
Colored Maps for Display 4
Construction Mitigation Description 2AND 4
Deed of Right -of -Way Dedication 1
Density Worksheet 4
Drainage Control Plan 2
Drainage Report 2
Elevations, Architectural 3 AND 4
Environmental Checklist 4
Existing Covenants (Recorded Copy)1AND4
Existing Easements (Recorded Copy) 1AND4
Flood Hazard Data,
Floor PlanS 3AND 4
Geotechnical ReportzAND3
Grading Elevations & Plan, Conceptual 2
Grading Elevations & Plan, Detailed
Habitat Data Report 4
Improvement Deferral z
Irrigation Plano
PROJECT NAME: S77N9E /0/Z&-Z4M/Tfft tD&AT—.
DATE: ZA44rho
H:\CED\Data\Forms-Templates\Self-Help Han douts\Planning\WaiversubmittaI reqs. docx Rev: 02/2015
LAND USE PERMIT SUBMITTAL REQUIREMENTS:
WAIVED
BY:
MODIFIED
BY:
COMMENTS:
King County Assessor's Map Indicating Site4
Landscape Plan, Conceptua14
Landscape Plan, Detailed 4
Legal Description4
Letter of Understanding of Geological Risk 4
Map of Existing Site Conditions,
Master Application Form
Monument Cards (one per monument) 1
Neighborhood Detail Map 4
Overall Plat Plan 4
Parking, Lot Coverage & Landscaping Analysis 4
Plan Reductions (PMTs) 4
Post Office Approval 2
Plat Name Reservation 4
Plat Plan 4
Preapplication Meeting Summary 4
Public Works Approval Lettere
Rehabilitation Plan 4
Screening Detail 4
Shoreline Tracking Worksheet 4
Site Plan 2AND4
Stream or Lake Study, Standard 4
Stream or Lake Study, Supplemental
Stream or Lake Mitigation Plan 4
Street Profiles 2
Title Report or Plat Certificate 1AND4
Topography Map 3
Traffic Study 2
Tree Cutting/Land Clearing Plan 4
Urban Design Regulations Analysis,,
Utilities Plan, Generalized 2
Wetlands Mitigation Plan, Final 4
Wetlands Mitigation Plan, Preliminary 4
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Waiversubmittalregs.docx Rev: 02/2015
AWL
Ah
LAND USE PERMIT SUBMITTAL REQUIREMENTS:
WAIVED
BY:
MQDIFIE
BY: 7
COMMENTS:
Wetlands Report/Delineation 4
Wireless:
Applicant Agreement Statement 2AND 3
Inventory of Existing Sites 2AND 3
Lease Agreement, Draft 2AND 3
Map of Existing Site Conditions 2AND 3
Map of View Area 2AN0 3
Photosimulations 2 AND 3
This Requirement may be waived by:
1. Property Services
2 Development Engineering Plan Review
3 Building
4 Planning
H:\CED\data\Forms-Templates\Self-Help Handouts\Planning\waiversubmittalregs.docx Rev. -02/2015
11
PRE -APPLICATION MEETING COMMENTS FOR
STINDE PRELIMINARY PLAT
PRE16-000049
CITY OF RENTON
Department of Community & Economic Development
Planning Division
February 11, 2016
Contact information:
Planner: Clark H. Close, 425-430-7286
Public Works Plan Reviewer: Ann Fowler, 425-430-7352
Fire Prevention Reviewer: Corey Thomas, 425-430-7024
Building Department Reviewer: Craig Burnell, 425-430-7290
/ (�7rl_�
Please retain this packet throughout the course of your project as a reference. Consider
giving copies of it to any engineers, architects, and contractors who work on the
project. You will need to submit a copy of this packet when you apply for land use
and/or environmental permits.
Pre-screening: When you have the project application ready for submittal, call and
schedule an appointment with the project manager to have it pre-screened before
making all of the required copies.
The pre -application meeting is informal and non-binding. The comments provided on
the proposal are based on the codes and policies in effect at the time of review. The
applicant is cautioned that the development regulations are regularly amended and the
proposal will be formally reviewed under the regulations in effect at the time of project
submittal. The information contained in this summary is subject to modification and/or
concurrence by official decision -makers (e.g., Hearing Examiner, Planning Director,
Development Services Director, Department of Community & Economic Development
Administrator, Public Works Administrator and City Council).
FIRE & EMERGENCY SERVICES ciTY 01: 0DEPARTMENT
M E M O RA N D U M
DATE: February 11, 2016
TO: Clark Close, Senior Planner
FROM: Corey Thomas, Plans Review Inspector
SUBJECT: Stinde Preliminary Plat — 850/870 Monroe Ave NE
PRE16-000049
1. The fire flow requirement for a single family home is 1,000 gpm minimum for
dwellings up to 3,600 square feet (including garage and basements). If the
dwelling exceeds 3,600 square feet, a minimum of 1,500 gpm fire flow would be
required. A minimum of one fire hydrant is required within 300 -feet of the
proposed buildings and two hydrants if the fire flow goes up to 1,500 gpm.
Existing hydrants can be counted toward the requirements as long as they meet
current code including 5 -inch storz fittings. Add a storz fitting to the existing
hydrant at the corner of NE 9th St and Monroe Ave NE.
The fire impact fees are currently applicable at the rate of $495.10 per single
family unit. Credit will be granted for the removal of two existing homes.
3. Fire department apparatus access roadways are required to be a minimum of 20 -
feet wide fully paved, with 25 -feet inside and 45 -feet outside turning radius. Fire
access roadways shall be constructed to support a 30 -ton vehicle with 75 -psi
point loading. Access is required within 150 -feet of all points on the buildings.
Full 90 -foot cul-de-sac type turnaround is required for dead end roads that
exceed 300 -feet long.
0
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
E
y,. aaii"j a
M E M O R A N D U M
DATE: February 11, 2016
TO: Clark Close, Senior Planner
FROM: Ann Fowler, Plan Review
SUBJECT: Stinde Preliminary Plat
850 & 870 Monroe Ave NE
PRE16-000049
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-
binding and may be subject to modification and/or concurrence by official City decision -makers. Review
comments may also need to be revised based on site planning and other design changes required by
City staff or made by the applicant.
1 have completed a preliminary review for the above -referenced proposal located at parcels 0923059116
& 9117, The following comments are based on the pre -application submittal made to the City of Renton
by the applicant.
WATER
1. The project is within the City of Renton's water service area in the Highlands 565 -hydraulic zone.
There is an existing 10 -inch City water main in Monroe Ave NE which can deliver 3,800 gpm. The
static water pressure is approximately 72 psi at ground elevation of 390 -ft -
2. The development will be required to extend a minimum 8 -inch water main into the new
development, connecting to the 10 -inch main in Monroe Ave NE. If the dwellings exceed 3,600
sq ft. a 10 -in line or fire sprinklers will be required.
3. A fire hydrant will be required at the entrance to the development in addition to the proposed
hydrant at the end of the development.
4. The site is located outside of an Aquifer Protection Area.
S. The development is subject to a water system development charge (SDC) fee. The SDC fee for
water is based on the size of the new domestic water to serve the project. The current water fee
for a single 1 -inch meter install is $3,245.00 per meter. Each lot shall have a separate meter.
SEWER
1. Sewer service is provided by City of Renton.
2. There is a 12 -inch wastewater main located in Monroe Ave NE,
3. There is an 8 -inch wastewater main located along the east property line of 850 Monroe Ave NE.
Stinde Preliminary Plat—Pre-AO-000049
Page 2 of 3
02/ 11/201b
4. The developer will need to show how they propose to serve the new development with sanitary
sewer service to each of the lots with connection to the system in Monroe Ave NE.
5. The development is subject to a wastewater system development charge (SDC) fee. SDC fee for
sewer is based on the size of the new domestic water to serve the project. The current sewer
fee for a 1 -inch meter install is $2,242.00 per meter. Each lot shall have a separate meter.
SURFACE WATER
1. There is a 24 -inch stormwater main in Monroe Ave NE.
1 2. A drainage report complying with the City adopted 2009 King County Surface Water Manual and
1 1. City. Amendments will be -required. Based on the City's, flow control map,'Ihe site falls within thje
Peak Rate Flow Control Standard area 7ri�tchj'ng-Emstina Site Conditions and is within the East f)
Lake Washington Drainage Basin. Refer to)Figbne 1.1.2.A — Flow chart to determine the .type of
drainage review required in the City of Renton 2009 Surface Water Design Manual Amendment.
3. Appropriate individual lot flow control BMPs will be required to help mitigate the new runoff
created by this development_ The final drainage plan and drainage report must be submitted
with the utility construction permit application.
4. A Construction Stormwater Permit from Department of Ecology is required if clearing and
grading of the site exceeds one acre.
5. A geotechnical report for the site is required. Information on the water table and soil
permeability, with recommendations of appropriate flow control BMP options with typical
designs for the site from the geotechnical engineer, shall be submitted'with the application.
6. Surface water system development fee is $1,485.00 for each new lot. This is payable prior to
issuance of the construction permit.
TRANSPORTATION
1. The proposed development fronts Monroe Ave NE. Monroe Ave NE is classified as a Minor
Arterial Road. Existing right-of-way (ROW) width is approximately 60 feet. To meet the City's
complete street standards for minor arterial streets, minimum RDW is 91 feet. Dedication of
15.5 feet of RDW fronting the site will be required. Per City code 4-6-060, half street
improvements shall include a pavement width of 54 feet (27 feet from centerline), a 0.5 -foot
curb, an 8 -foot planting strip, an 8 -foot sidewalk, street trees and storm drainage
improvements. However, transportation has determined that there is no plan to widen the
Monroe Ave NE corridor and will accept a lesser standard. Recommendation will allow the
development to maintain the existing curb. Existing roadway width between the ROW centerline
and existing edge of roadway is approximately 20 -feet. Half street improvements shall include
20 -feet of paved roadway from centerline, 0.5 -foot curb and gutter, 8 -foot planter strip and 8 -
foot sidewalk. To complete this street section, dedication of 6.5 -feet will be required. The
applicant may submit an application to the City requesting a modification as outlined in City
code 4-9-25005d.
2. Frontage improvements along the new road and cul-de-sac shall comply with the City's
complete street standards, including and 8 -foot planter strip, 5 -foot sidewalk and 0.5 -foot curb.
3. Current City of Renton standards require a cul-de-sac turnaround for dead-end streets greater
than 300 feet and less than 500 feet. The cul-de-sac turnaround shall have a design approved by
the Administrator and Fire and Emergency Services. The applicant may submit an application to
Strode Preliminary Plat—Pre-App 16
Page 3 of 3
02/11/2016
the City requesting a modification for the use of a hammerhead turnaround in lieu of the
required cul-de-sac as outlined in City code 4-9-25005d.
4. Refer to City code 4-4-080 regarding driveway regulations.
a. A minimum separation of 5 feet is required between driveway and the property line.
b. The maximum width of single loaded garage driveway shall not exceed nine feet (9') and
double -loaded garage driveway shall not exceed sixteen feet (16').
5. Street lighting is required from a development that includes more than 4 residential units.
6. Payment of the transportation impact fee is applicable on the construction of the single family
houses at the time of application for the building permit. The current rate of transportation
impact fee is $2,951.17 per single family house. The transportation impact fee that is current at
the time of building permit application will be levied, payable at building permit issue_
GENERAL COMMENTS
1. All construction or service utility permits for drainage and street improvements will require
separate plan submittals. All utility plans shall conform to the Renton Drafting Standards. Plans
shall be prepared by a licensed Civil Engineer.
2. When utility plans are complete, please submit four (4) copies of the drawings, two (2) copies of
the drainage report, the permit application, an itemized cost of construction estimate, and
application fee at the counter on the sixth floor.
3. All sewer stubs, water services and storm connections are required to be provided to each lot
prior to recording of the preliminary plat.
4. Fees quoted in this document reflect the fees applicable in the year 2016 only and will be
assessed based on the fee that is current at the time of the permit application.
5. All utilities serving the site are required to be undergrounded.
1Y o1 -
DEPARTMENT OF COMMUNITY � , 'R
AND ECONOMIC DEVELOPMENT enton
M E M O R A N D U M
DATE: February 11, 2016
TO: Pre -Application File No. 16-000049
FROM: Clark H. Close, Senior Planner
SUBJECT: Stinde Preliminary Plat — 850/870 Monroe Ave NE
General: We have completed a preliminary review of the pre -application for the above -
referenced development proposal. The following comments on development and permitting
issues are based on the pre -application submittals made to the City of Renton by the applicant
and the codes in effect on the date of review. The applicant is cautioned that information
contained in this summary may be subject to modification and/or concurrence by official
decision -makers (e.g., Hearing Examiner, Community & Economic Development Administrator,
Public Works Administrator, Planning Director, Development Services Director, and City
Council). Review comments may also need to be revised based on site planning and other design
changes required by City staff or made by the applicant. The applicant is encouraged to review
all applicable sections of the Renton Municipal Code. The Development Regulations are
available for purchase for $50.00 plus tax from the Finance Division on the first floor of City Hall
or online at www,rentonwa.gov.
Project Proposal: The subject properties are located in the President Park Designated
Neighborhood within the City of Renton near the intersection of Monroe Ave NE and NE 9th at
850 and 870 Monroe Ave NE (APN's 0923059116 and 0923059117). The applicant is proposing a
preliminary plat of 2.47 acres (107,157 sq. ft.) into 13 single family residential lots. In addition to
the lots, a tree retention and detention vault tracts would serve the subdivision. Cut and fill
volumes are expected to balance. The site has a Comprehensive Plan Land Use of Designation of
Residential Medium density and a zoning designation of Residential -8 (R-8) dwelling units per
net acre (du/ac). All existing improvements are proposed to be demolished or removed during
plat construction.
Current Use: The parcels are currently developed with two single family residences and several
associated detached accessory structures and landscaping. The eastern portion appears
undeveloped.
Zoning/Density Requirements: The subject property is located within the R-8 zoning
classification. The density range allowed in the R-8 zone is a minimum of 4.0 to a maximum of
8.0 dwelling units per 1 net acre. The Residential Medium Density Land Use designation is
intended to implement the R-8 zone. Development in the R-8 zone is intended to create
opportunities for new single family residential neighborhoods and to facilitate high-quality infill
development that promotes reinvestment in existing single family neighborhoods. It is intended
to accommodate uses that are compatible with and support a high-quality residential
H_\CED\Planning\Current Plann1ng\PREAPP5\16.000049
Stinde Preliminary Plat, PR749
Page 2 of 5
February 11, 2016
environment and add to a sense of community. Detached single family residential dwelling units
are permitted uses within the R-8 zoning designation.
Density: The area of public and private streets and critical areas would be deducted from the
gross site area to determine the "net" site area prior to calculating density. In order to calculate
the proposed density of the project, any area of public road, private easement, and/or critical
area dedication must be known. Using an estimated net square footage of 1.97 acres, the 13 -lot
proposal arrives at a net density of approximately 6.6 du/ac (13 lots / 1.97 net acres = 6.6
du/ac). A Density Worksheet would be required at the time of formal short plot application.
The applicant would be required to demonstrate compliance with the net density
requirements of the .zone at the time of formal application. Based on the gross density of 6.6
dulac, the subject site would meet the minimum density requirements of the zone.
Development Standards: The project would be subject to RMC 4-2-110A, "Development
Standards for Single Family Zoning Designations" effective at the time of complete application
(noted as "R-8 standards" herein).
Minimum Lot Size, Width and Depth —The minimum lot size permitted in the R-8 zone, is 5,000
square feet for parcels being subdivided. Minimum lot width is 50 feet for interior lots and 60
feet for corner lots; minimum lot depth is 80 feet. The proposal complies with the minimum lot
size of 5,000 square feet per lot and the minimum lot width and depth standards. It is the
applicant's responsibility to demonstrate compliance with the minimum lot size, width and
depth criteria of the zone at the time of formai application.
Building; Standards — The R-8 standards allow a maximum building coverage of 50% of the lot
f area. The maximum impervious coverage in the R-8 zone is 65%. The maximum wall plate height
of is restricted to 24 feet, and the buildings shall be not more than two stories. Roofs with a pitch
i equal to or greater than 4:12 may project an additional six (6) vertical feet from the maximum
�\ wall plate height; common rooftop features, such as chimneys, may project an additional four
(4) vertical feet from the roof surface. Non-exempt vertical projections (e.g,, decks, railings, etc.)
shall not extend above the maximum wall plate height unless the projection is stepped back
one -and -a -half (1.5) horizontal feet from each facade for each one (1) vertical foot above the
maximum wall plate height. Detached accessory structures must remain below a height of 15
feet. The gross floor area must be less than that of the primary structure. Accessory structures
are also included in building lot coverage calculations. Verification of the building coverage and
building height would be verified at the time of building permit review.
Setbacks — Setbacks are the minimum required distance between the building footprint and the
property line. The required setbacks for the R-8 zone are: Front yard: 20 feet for the primary
structure; Rear yard: 20 feet; Side yards: 5 feet; and Side yards along streets: 15 feet.
Lot Configuration —One of the following is required:
1. Lot width variation of 10 feet (10') minimum of one per four (4) abutting street -fronting
lots, or
(7)Minimum of four (4) lot sizes (minimum of 400 gross square feet size difference), or
3.. A front yard setback variation of at least five feet (5') minimum for at least every four (4)
abutting street fronting lots.
It is the applicant"s responsibility to demonstrate compliance with lot configuration. Based on
the submitted site plan, the preliminary plat would comply with Option 2 above.
H:\CED\Planning\Current Plannin8`PREAPPs\16-000049
Stinde Preliminary P1*16-C00049 9
Page 3 of 5
February 11, 2016
Access/Parking: Access to the lots is proposed to be gained through a 53 -foot wide residential
access street, from Monroe Ave ISE, through the center of the site terminating with a
hammerhead approximately 410 feet from Monroe Ave NF. An approved turnaround is
required for dead end streets 350 feet or longer and a cul-de-sac is required for a dead end
street from .300 feet to 500 feet. A modification request would need to be granted for any
deviations from the dead end street code standards (HMC 4-6-060H.2).
Each lot is required to accommodate off,street parking for a minimum of two vehicles.
©riveways:.The maximum driveway slopes cannot exceed 15%. If the grade exceeds 15%, a
variance is required. The maximum width of single loaded garage driveways shall not exceed 9
feet and double loaded garage driveways shall not exceed 16 feet.
Landscaping: With the exception of critical areas, all pervious area shall have landscape
treatment, Landscaping may include hardscape such as decorative paving, rock outcroppings,
fountains, plant containers, etc. Ten feet (10') of on-site landscaping is required along all public
street frontages, with the exception of areas for required walkways and driveways and those
zones with building setbacks less than ten feet (10'). In those cases, ten feet (10') of landscaping
shall be required where buildings are not located. Where there is insufficient right-of-way space
or no public frontage, street trees are required in the front yard subject to approval of the
Administrator. A minimum of two (2) trees are to be located in the front yard prior to final
inspection. A conceptual landscape plan shall be provided with the formalland use application
as prepared by a registered Landscape Architect, a certified nurseryman or other certified
professional.
Storm drainage facilities are required to comply with the minimum 15 -foot perimeter
landscaping strip on the outside of the fence unless otherwise determined through the site plan
review or subdivision review process. Please refer to landscape regulations RMC 4-4-070 for
further general and specific landscape requirements.
Fences/Walls: if the applicant intends to install any fences or retaining walls as part of this
project, the location must be designated on the landscape plan or grading plan. A fence and/or
wall detail should also be included on the plan. A fence taller than 6 feet shall require a building
permit or an explicit exemption from the Building Official. A retaining wall that is 4 feet or taller,
as measured by the vertical distance from the bottom of the footing to the finish grade at the
top of the wall requires a building permit. A fence shall not be constructed on top of a retaining
wall unless the total combined height of the retaining wall and the fence does not exceed the
allowed height of a standalone fence. For more information about fences and retaining walls
refer to RMC 4-4-040.
Significant Tree Retention: The applicant is proposing a tree retention tract at the northwest
corner of the proposed subdivision, A Tree Retention/ Land Clearing (Tree Inventory) Plan along
with a tree retention worksheet shall be provided with the formal land use application. The tree
retention plan must show preservation of at least 30 percent (30%) of significant trees, and
indicate how proposed building footprints would be sited to accommodate preservation of
significant trees that would be retained. The Administrator may authorize the planting of
replacement trees on the site if it can be demonstrated to the Administrator's satisfaction that
an insufficient number of trees can be retained.
In addition to retaining 30% of existing significant trees, each new lot would be required to
provide a minimum tree density of 2 trees per 5,000 square feet of lot area onsite. Protected
H:\CEU`Planning\Current Planning\PREAPP5\16-000049
Strode Preliminary Plat, PR .D 49
Page 4 of
February 11, 2016
trees that do not contribute to a lot's required minimum tree density shall be held in
perpetuity within a tree protection tract.
Significant trees shall be retained in the following priority order:
Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees
on slopes greater than twenty percent (20%); Significant trees adjacent to critical areas and their
associated buffers; and Significant trees over sixty feet (60') in height or greater than eighteen
inches (18") caliper.
Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; Other
significant native evergreen or deciduous trees; and Other significant non- native trees.
Priority Three: Alders and cottonwoods shall be retained when all other trees have been
evaluated for retention and are not able to be retained, unless the alders and/ or cottonwoods
are used as part of an approved enhancement project within a critical area or its buffer.
The Administrator may require independent review of any land use application that involves
tree removal and land clearing at the City's discretion.
If staff determines that the trees cannot be retained, replacement trees, with at least a 2 -inch
caliper or an evergreen at least 6 feet tall, shall be planted at a rate of 12 caliper inches of new
trees to replace each protected tree removed. A formal tree retention plan prepared by an
arborist or landscape architect would be reviewed at the time of the Preliminary Plat
application.
Critical Areas: Based on City of Renton Critical Areas Maps, a moderate landslide hazard may
exist on the site. Moderate landslide hazards are Geological Hazards; therefore, a geotechnical
study may be required. The geotechnical study shall demonstrate that the proposal will not
increase the threat of the geological hazard to adjacent properties beyond the pre -development
conditions, the proposal will not adversely impact other critical areas, and the development can
be safely accommodated on the site. In addition, the study shall assess soil conditions and detail
construction measures to assure building stability.
It is the applicant's responsibility to ascertain whether any additional critical areas or
environmental concerns are present on the site during site development or building
construction.
Environmental Review: Environmental (SEPA) Review is required for projects with ten or more
dwelling units or when the proposal contains critical areas. Note: The fee for Environmental
(SEPA) Review is $1,030.00 ($1,000.00 plus 3 %'Technology Surcharge Fee).
Permit Requirements: Preliminary Plat requests would be processed concurrently with the
Environmental (SEPA) Review within an estimated time frame of 10 to 12 weeks, from the time
that the application is accepted as complete. The fee for a preliminary plat application is
$4,635.00 ($4,500.00 plus 3% Technology Surcharge Fee) and each modification request is
$154.50 ($150.00 each plus a 3% Technology Surcharge Fee). Detailed information regarding the
land use application submittal is available on the City's website.
The applicant will be required to install a public information sign on the property. Detailed
information regarding the land use application submittal requirements is provided in the
attached handouts. Once Preliminary Plat approval is obtained, the applicant must complete the
required improvements and dedications, as well as satisfy any conditions of the preliminary
H:\CEa\Plannrng\Current Planning�PREAPP.S\16-000049
5tinde Preliminary PIOE16-000049 is
Page 5 of 5
February 11, 2416
approval before submitting for Final Plat review. Once final approval is received, the plat may be
recorded. The newly created lots may only be sold after the plat has been recorded.
In addition to the required land use permits, separate construction and building permits would
be required.
Fees: In addition to the applicable building and construction fees, impact fees would be
required. Such fees would apply to all projects and would be calculated at the time of building
permit application and payable prior to building permit issuance. The 2015 application fees are
as follows:
A Transportation Impact Fee based on $2,951.17 per each new single family residence;
• A Parks Impact Fee based on $1,887.94 per each new single family residence;
4 A Fire Impact fee of $495.10 per each new single family residence; and
® Renton School District Impact Fee is $5,541.00 per each new single family residence.
A handout listing Renton's development-related fees is available on the City of Renton website
for your review.
Note: When the formal application materials are complete, the applicant is strongly
encouraged to have one copy of the application materials pre-screened at the 6th floor front
counter prior to submitting the complete application package. Please call dark H. Close,
Senior Planner at 425-430-7289 for an appointment.
Expiration: Upon approval, preliminary plats are valid for five years. Permit applications, such as
Planned Urban Development applications that are approved as a companion to a preliminary
plat application shall remain valid for the duration of the preliminary and final plat. It is the
responsibility of the subdivider to monitor the expiration date.
H;`CF0\P1anning`Current P1anring\PRFAPPSj16-000049
r- y
Ca3
i
Cfl Y(
Q
o
'=
=
c �
❑
y A m
O
o a A rn
�
` a V., 75 u
in
c a v
U
v r
W
a
�. 7
j 2 O O
C
a c c
m eo m m
c s m y
:� c oq _m
m U O E SP
m
v
ani
v a a �, E a
m o m
a� p m m m a� .°1
E G 6 E m —
o f a U o 9
L
'n
.' N N Of a3
55 ab d = U U
a a ML a u
U 7 U a U c c 0 2 ¢ m as
x a >>
ua
9
m
U
a a c3i
c� ? a' uEi
E
^��
1 ❑�❑ ❑
J
z u'7
��'
M �,
s'� sir . ar'a e•• � a 's 4
co = t•` x � :..
99
M
r.-
in
CL
L
r i -��
�M: �
ii`. ivY III �
YY
�y - r• :
'h i
,4:.
�4•
� '
�
M
J �:FF R
• Ski 1. ��.
pry 5.'.
i
N
x
r
M,„
e�
C7
lu.
Y �r
ryry �
YIN
pyz
filxo`
X51, i �lS
k k
R
kyr ���gdd�LL r,
6- a
'�!
'
t .. v r •w. a i; _..:, i .. 'f : - � .�,t �
6�..FdAi.e14tau,
r- y
Ca3
i
Cfl Y(
Q
U 4� NOL`�NrHSYp1 }wAN3+i Ykl '3�1LY35 � p
I� �� �gig3e� � SQ}1 NOSN3H ILL2 � 15 HlS�3N il'4i � � 7' 5
• 4 ��3 ND151�lQan53RN3hY90tlNOw �z�s�wvxzrnoaatrx �"`" "°�"'" �` � � �a`
y L
1L R
f I
(4012
�a I Z e j
I f
I I a
i
- 53.7T
53.77'
5J77
54.57
r
y�geg
9A,62
! 4 I
I I
� ung
j
o" I a
I f
I h I
I
I I
I I
I
�pY
sr
----J
! kd
I
—
L�---J
r_srls
slli
I I
I J
L J
I f
I I a
I
g I 1
— _ Vsrgj
9A,62
! 4 I
I I
o" I a
!
I h I
!
I
sr
----J
! kd
I
—
L�---J
r_srls
0 1 I
i I
n3o b
I 1
ti
o I h I
srls _ _I
^o e
!
I tlw I
---- -+-- ---
o Ni o
--- --- ..--- ------------
r --
3N 3A 308NOW
U �� NOA'JM1i5YM 'NQI YN. 3TL[Y35 �i y
�'�f i Spy NIOSM3H 3ZL 15 H1!£3N lWi r
q
io
1,NOlSYAeOSnq.9nN3AV30HNOff 077S3NOH2WOSNVH I
53.77• 1 53. 7Y 1 53.
r--- F----7
----
� �-----�
1 I I I i
i I I I I
4
I I
vi
opI
I I
a,
I I ,sirs
,st•rs'
� I
�
I I O,
I$ I �
C-•
Air -
YL
I I \
I
a
I I I
I I
I _.srlg_
u
i u'
5
10
�a
e
n I
Sple
1B��
I
�--,•Sp
I I I
I o
1
v nor ) "Mugm 0, ' 3N 3AV 30&1VOW
a,
v nor ) "Mugm 0, ' 3N 3AV 30&1VOW
C
July 19, 2016 DRS Project No. 16007
CITY OF RENTON
PROJECT NARRATIVE
PRELIMINARY PLAT OF THE PINES
The project is a proposed single-family residential development of 2.48 acres, known
as Tax Parcels Numbers 092305-9116 & -9117 into 14 single-family residential lots.
The property is located at 850 & 870 Monroe Ave NE in the City of Renton,
Washington. All existing improvements on Site will be demolished or removed during
plat construction.
Project Contact Information:
Developer: Harbour Homes, LLC
400 North 34th Street, Suite 300
Seattle, WA 98903
(206) 315-8130
Engineer/Surveyor:
Land Use Permits Required:
-Preliminary Plat Approval
-Final Plat Approval
-Environmental Review
D. R. STRONG Consulting Engineers Inc.
620 7t4 Avenue
Kirkland, WA 98033
(425) 827-3063
Yoshio L. Piediscalzi, P.E.
-Grading Permit
-Building Permit
Zoning and Density:
The property and adjacent properties are zoned R-8.
Current use of Site and existing improvements:
The current Site contains two single family residences with associated driveways,
detached garage, two sheds and a barn. The south eastern portion of the Site
appears to be undisturbed in a forested condition with light underbrush. All existing
improvements will be removed. All existing vegetation and trees shall be removed
with the exception of 9 significant trees.
ti 3
Nage 2 of 3
Special Site features:
None
Soil Type and Drainage Conditions:
Per the King County Soil Survey, onsite soil consists of AmC, Arents, Alderwood
material, 6-15%. Site runoff sheet flows west over the western property line to the
vertical curb and gutter located on the east side of Monroe Avenue NE. Runoff
continues north along the flowline before entering a type 1 CB, entering the existing
conveyance system in Monroe Ave NE. Runoff is then conveyed south via 24" pipe.
Proposed Use of Property:
The Project is the subdivision of two existing parcels zoned R8 (2.48 ac. total) into
14 single-family residential lots, per the City of Renton's subdivision process. This
will result in a net density of 7.53 dwelling units per acre. Lot square footages
range from 5,000 to 5,201 s.f., with no lot sizes below the minimum 5,000 s.f.
threshold set by the City.
Access, Traffic, and Circulation:
The Project proposes 53' right-of-way through the center of the Site, terminating
with a hammerhead turnaround. This road will also contain an 8' planter strip and 5'
sidewalk on both sides. Frontage improvements will be installed within the existing
right of way on Monroe Avenue NE. A modification has been included with this
submittal for the frontage improvements on Monroe Ave. NE.
RMC allows for hammerhead turnarounds on roads between 150 and 300 feet in
length. The proposed roadway is just under 500 feet in length and will therefore
require a modification from the City of Renton. Also, rear lot access is required in
the R8 zone. Lots 5 and 6 will have side/rear access via a shared driveway. A
shared driveway is now allowed for subdivisions of ten or more lots; therefore, a
modification has been included with this submittal for the shared driveway.
Proposed Site and Offsite Improvements:
Half street improvements along Monroe Ave NE will consist of a 5.7' R.Q.W.
dedication providing for a 5' sidewalk and 8' planter strip. The Site will develop a
new Street, Road A, with hammerhead turnaround. Road A will consist of a 53'
R.O.W. dedication, providing 26' of pavement, curb and gutter, 8' planter strip and
5' sidewalks. The hammerhead turnaround will consist of 20' of pavement, curb and
gutter.
Sanitary sewer and water mains will extend along Road A and tap into the existing
mains located in Monroe Ave NE. Stormwater runoff from the Site and upstream
tributary area will be conveyed to a new combined detention/wet-vault in Tract D.
The Project will meet the drainage requirements of the 2009 King County Surface
Water Design Manual and City Amendments per the City of Renton Municipal Code
(Manual), as adopted by the City. A restricted footprint BMP will be utilized to
provide the cumulative 10% BMP requirement per lot. A portion of the Site, Tract A,
shall remain undisturbed providing tree retention.
0 9
Page ; of
The project will locate a job shack on the Site as prescribed by the contractor during
construction.
Model homes will be built, however, the lots on which these homes will be built has
not been determined at this time.
Cut Materials:
Cut and fill volumes are expected to balance.
Approximately 1,226 c.y. of cut and 2,207 c.y. of fill is computed for the Project. The
net volume is approximately 981 c.y. of fill.
Tree Inventory:
Tree retention shall comply with a minimum of at least thirty (30%) of significant
tress retained according to priority established in RMC 4-4-930. If 30% tree
retention cannot be met, additional trees will be planted to meet the City's tree
retention requirements per Renton Municipal Code section 4-4-130 Tree Retention
and Land Clearing Regulations.
9 of the existing 57 significant trees will be retained onsite. 15 trees are within
proposed right of way and 17 trees are dead, diseased or dying. This equates to
36% retained; see tree retention spreadsheet.
Estimated Construction Cost & Proposed Market Value:
The approximate construction cost is typical of a subdivision of this size and nature
totaling approximately $600,000.00. The estimated fair market value of the
proposed project is approximately $3,360,000.00.
The Pines
Construction Mitigation Description
The following narrative is provided to describe the proposed construction mitigation
measures that Harbour Homes, LLC "Harbour Homes" and the to be named general contractor
"Contractor" for The Pines will implement throughout the duration of the site development and
infrastructure period as well as during building construction.
Proposed Construction DatesSite Work : JuI 2017-Februar 2018
Harbour Homes anticipates on beginning clearing and site development work in the mid-
summer of 2017 depending on the timing of approvals. Harbour Homes anticipates roughly a
180 day schedule to finalize all grading, storm, sewer, water and first lift of asphalt on the site.
The goal will be to have the site completely stabilized by November 1" 2017 before the fall.
Proposed Construction Dates (Building Construction):
Harbour Homes plans on beginning construction of a model home in April of 2018 and
anticipates starting two homes per month thereafter with an average construction timeline of
seven months to complete.
Hours & Days of Operation
Normal site hours of operation will be in compliance with the allowable working hours in the
City of Renton which are as follows:
For new single-family residences and non-residential construction, the permitted work hours are
7:00am-8:00pm Monday through Friday, 9:00am-8:00pm Saturday, and no work sholl be
permitted on Sunday.
Proposed HaulinalTransportation Routes
The Pines site is located on Monroe Avenue NE just south of 9th Street. The Contractor
anticipates utilizing one haul route to and from SR -900 (See attached Exhibit "A" for location).
Heading north on Monroe Ave NE, head west on NE 101h St to SR -900 then heading east or west
depending on the type of material import/export.
Measures to Minimize Impacts
Harbour Homes and the Contractor will make every effort to minimize the impacts from this
project on the surrounding neighbors, the environment and traffic circulation for the
immediate area. The Contractor and Harbour Homes' contact information will be clearly posted
at the site and the job trailer to ensure communication and immediate responses to any
questions or inquiries from the community.
Dust/Mud/Erosion Impacts- The Contractor will implement and maintain the TESC measures
approved for The Pines project at all times. Measures such has water trucks, street sweepers
and maintaining perimeter erosion fencing help to mitigate impacts. In addition, regular
inspections by the City of Renton and the project's certified erosion control and sediment lead
(Earth Solutions Northwest), as well as regular meetings between Harbour Homes and the
Contractor to ensure compliance.
Traffic/Transportation Impacts- Harbour Homes and the Contractor will secure all necessary
Right -of -Way use permits including providing traffic control measures to minimize the impact of
the frontage improvements associated with the project. Haul routes and hours will be adhered
o and Harbour Homes is attempting to minimize the amount of import/export needed on the
project through careful design of the finishing grade within the site. Utilizing the on-site
material and repurposing wood chips and top soil from the clearing activities minimize the need
for ongoing truck and trailer loads.
Noise- The Contractor will comply with the allowable working hours in the City of Renton (see
above) to minimize the impact to neighbors during the site construction and building
construction.
Exhibit "A"
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
R'ntonQ
DENSITY WORKSHEET
Planning Division
1055 South Grady Way -Renton, WA 98057
Phone: 425-430-7200 1 www.rentonwa.gov
1. Gross area of property 107,969 square feet
2. Deductions: Certain areas are excluded from density calculations.
These include:
Public Streets* 27,023 square feet
Private access easements*
Critical Areas"
Total excluded area:
square feet
square feet
27,023 square feet
3. Subtract line 2 (total excluded area) from line 1 for
net area 80,946 square feet
4. Divide line 3 by 43,560 for net acreage
S. Number of dwelling units or lots planned
6. Divide line S by line 4 for net density
*Alleys (public or private) do not have to be excluded.
1.86 acres
14 units/lots
7.53 = dwelling units/acre
**Critical Areas are defined as "Areas determined by the City to be not suitable for
development and which are subject to the City's Critical Areas Regulations including very high
landslide areas, protected slopes, wetlands, or floodways." Critical Areas buffers are not
deducted/excluded.
1
R_\2016\0\16007\3\Documents\ReportsNPreliminary\Density Worksheet.doc Rev, 08/2015
•
DEPARTMENT OF COMMUNITY ciTv aF
AND ECONOMIC DEVELOPMENT Renton
TREE RETENTION WORKSHEET
Planning Division
1055 South Grady Way -Renton, WA 98057
Phone: 425-430-7200 1 www.rentonwa.Rov
1.
Total number of trees over 6" diameter', or alder or cottonwood
trees at least 8" in diameter on project site 57
trees
2.
Deductions: Certain trees are excluded from the retention calculation:
Trees that are dangerous2 17
trees
Trees in proposed public streets 15
trees
Trees in proposed private access easements/tracts
trees
Trees in critical area s3 and buffers
trees
Total number of excluded trees: 32
trees
3.
Subtract line 2 from line 1: 25
trees
4.
Next, to determine the number of trees that must be retained", multiply line 3 by:
0.3 in zones RC, R-1, R-4, R-6 or R-8
0.2 in all other residential zones
0.1 in all commercial and industrial zones 7.5
trees
5.
List the number of 6" in diameter, or alder or cottonwood trees
over 8" in diameter that you are proposings to retain: 9
trees
6.
Subtract line 5 from line 4 for trees to be replaced:
(if line 6 is zero or less, stop here. No replacement trees are required) 0
trees
7.
Multiply line 6 by 12" for number of required replacement inches:
inches
8.
Proposed size of trees to meet additional planting requirement:
(Minimum 2" caliper trees required)
inches per tree
9.
Divide line T by line 8 for number of replacement trees6:
(If remainder is .5 or greater, round up to the next whole number)
trees
1 Measured at 4.5' above grade.
2 A tree certified, Ina written report, as dead, terminally diseased, damaged, or otherwise dangerous to persons or property by a licensed
landscape architect, or certified arborist, and approved by the City.
3 Critical areas, such as wetlands, streams, floodplains and protected slopes, are defined in RMC 4-3-050.
° Count only those trees to be retained outside of critical areas and buffers.
5 The City may require modification of the tree retention plan to ensure retention of the maximum number of trees per RMC 4-4-1301-17a.
6 When the required number of protected trees cannot be retained, replacement trees, with at least a two-inch (2") caliper or an evergreen at least
six feet (6') tall, shall be planted. See RMC 4.4-130.H.1.e.(ii) for prohibited types of replacement trees.
1
R:X2016\0\16007\3\Documeots\ReportsXPreli mi nary\TreeRetenti on Worksheet. doc Rei: 06/2015
0
July 19, 2016
Matthew Herrera
City of Renton
1055 S Grady Way
Renton, Washington 98057
Re: The Pines Preliminary Plat, PRE16-000049
Dear Mr. Herrera:
Project No. 16007
This letter is provided to formally request modifications from RMC 4-6-060(F)(2), RMC 4-6-
060(H)(2), and RMC 4-6-060(J)(1). Specifically, the modification from RMC 4-6-060(F)(2) is
the request to allow for the reduction in pavement width and sidewalk width for Monroe Avenue
NE (minor arterial). Specifically, the modification from RMC 4-6-060(H)(2) is the request to
allow use of a hammerhead turnaround, in lieu of a cul-de-sac, on a dead end street that is
greater than 300 feet in length. Finally, the modification from RMC 4-6-060(J)(1) is the request
to allow the use of a shared driveway in a subdivision with more than ten lots.
RMC 4-6-060(E)(2) Background
Monroe Avenue NE is currently developed with approximately 44 -feet of pavement and curb
and gutter on both sides.
Modification Reguested
RMC 4-6-060, Street Standards, F. Public Street Right -Of -Way Design Standards: A minor
arterial requires 91 -feet of right-of-way, 54 -feet of pavement width, 8 -feet of planter strip, and
sidewalk on both sides. The applicant is proposing to hold the existing curb line
(approximately 44 -feet of pavement width) and provide an 8 -foot planter strip and a 5 -foot
sidewalk.
Per the City of Renton Modification Submittal Requirements, in order to approve a modification
request, the following six conditions must exist:
1. Substantially implements the policy direction of the policies and objectives of the
Comprehensive Plan Land Use Element and the Community Design Element and the
proposed modification is the minimum adjustment necessary to implement these policies and
objectives.
2. Will meet the objectives and safety, function, appearance, environmental protection and
maintainability intended by the Code requirements, based upon sound engineering judgment.
3. Will not be injurious to other property(ies) in the vicinity.
4. Conforms to the intent and purpose of the Code.
620 7th Ave
Kirkland, WA 98033-5565
Phoney (425) 827-3063
Fax: (425) 827-2423
Toll Free: (800) 962-1402
wwwArstrong.corr
Engineers Surveyors j Planners
0
Matthew Herrera
July 19, 2016
Page 2 of 6
0
5. Can be shown to be justified and required for the use and situation intended.
6. Will not create adverse impacts to other property(ies) in the vicinity.
Justification
1. The City's goal is to maintain the existing curb and gutter location and maintain the
bicycle corridor along Monroe Avenue NE. Maintaining the existing curb will provide
approximately 22 -feet from the existing centerline to the curb line. The intent of the 8 -foot
sidewalk is to allow for the bicycle lane to be transferred to the sidewalk area to create a multi-
use path. As stated above, Monroe Avenue NE is a dedicated bicycle corridor, therefore, an
additional bicycle lane or multi -use path is not necessary. Please see attached email from
Clark Close.
2. The modification will meet the objectives and safety, function, appearance,
environmental protection and maintainability by the Code.
3. Approval of the modification request would allow for development of this plat to maintain
the existing curb line and would avoid the removal of neighboring properties curbldriveways.
4. As discussed above, the modification conforms to the intent and purpose of the Code.
5. The City has determined, per the pre -application notes, that there is no intent to widen
the Monroe Avenue NE corridor. Thus, it is not practical to widen such a minor portion of the
corridor.
6. Approval of the modification request would allow for development of this plat to maintain
the existing curb line and would avoid the removal of neighboring properties curbldriveways.
Cl
Matthew Herrera
July 19, 2016
Page 3 of 6
RMC 4-6-060(H)(2) Background
0
The Project is proposing a dead end street less than 540 feet in length from Monroe Avenue
N E, east.
Modification Requested
RMC 4-6-060, Street Standards, H. Dead End Streets: For dead end streets from 300' to 500'
in length, a cul-de-sac is required. The applicant is proposing use of a hammerhead turn
around on a road that is 375 feet from the proposed curb line in Monroe Ave NE to the
centerline of the proposed hammerhead..
Per the City of Renton Modification Submittal Requirements, in order to approve a modification
request, the following six conditions must exist:
1. Substantially implements the policy direction of the policies and objectives of the
Comprehensive Plan Land Use Element and the Community Design Element and the
proposed modification is the minimum adjustment necessary to implement these policies and
objectives.
2. Will meet the objectives and safety, function, appearance, environmental protection and
maintainability intended by the Code requirements, based upon sound engineering judgment.
3. Will not be injurious to other property(ies) in the vicinity.
4. Conforms to the intent and purpose of the Code.
5. Can be shown to be justified and required for the use and situation intended.
6. Will not create adverse impacts to other property(ies) in the vicinity.
Justification
1. Providing a cul-de-sac turnaround with a right of way diameter of 110 feet is more than
50% of the total property width (property width is 216 feet) and greatly encumbers usable
space. The application of a cul-de-sac would better serve properties with greater dimensions
that allow for lot access around the circumference of the cul-de-sac and allow it be utilized to
its full potential. Approval of the modification request is the minimum modification to
accomplish the desired purpose.
2. The project proposes to terminate the proposed roadway with a hammerhead which is
an acceptable emergency vehicle turnaround. Additionally, the future homes in the entire plat
shall be required to be fire sprinklered.
3. Approval of the modification request would allow for development of this plat which
would be in line with the neighboring developments in size, magnitude and density. Granting
of this variance would not constitute special privilege inconsistent with projects in the vicinity
given that the cul-de-sac turnarounds in the immediate vicinity of the project are between 80
and 90 feet in diameter. The requirement for 110 feet in diameter encumbers the property
more significantly than any developments in the vicinity.
4. As discussed above, the modification conforms to the intent and purpose of the Code
9
Matthew Herrera
July 19, 2016
Page 4 of 6
C�
5. As discussed above, the required diameter size of the cul-de-sac is more than 50% of
the total property width. Therefore, it greatly encumbers the usable space. The hammerhead
still provides the necessary turnaround for fire.
6. Approval of the modification would not create adverse impacts to the adjacent
properties.
In addition, please see the attached letter and correspondence with Corey Thomas.
Matthew Herrera
July 19, 2016
Page 5 of 6
RMC 4-6-060(J)(1) Background
The Project is proposing a shared driveway to allow for rear access on two of the proposed
lots_
Modification Requested
RMC 4-6-060, Street Standards, J. Shared Driveway Standards: Shared driveways may be
allowed for access to four (4) or fewer residential lots, provided the subject lois are not created
by a subdivision of ten (10) or more lots. The applicant is proposing a shared driveway for two
of the proposed lots in order to allow for those lots to have rear access.
Per the City of Renton Modification Submittal Requirements, in order to approve a modification
request, the following six conditions must exist:
1. Substantially implements the policy direction of the policies and objectives of the
Comprehensive Plan Land Use Element and the Community Design Element and the
proposed modification is the minimum adjustment necessary to implement these policies and
objectives.
2. Will meet the objectives and safety, function, appearance, environmental protection and
maintainability intended by the Code requirements, based upon sound engineering judgment.
3. Will not be injurious to other property(ies) in the vicinity.
4. Conforms to the intent and purpose of the Code.
5. Can be shown to be justified and required for the use and situation intended.
6. Will not create adverse impacts to other property(ies) in the vicinity.
Justification
1. The City's goal is for subdivisions within the RS zone to have alley load/rear access lots.
However, an alley is not feasible on this Project due to the width of the property. A shared
driveway will be utilized by two of the proposed lots in order to provide rear access. This will
be provided to meet the objectives/policies of the zoning.
2. The modification will meet the objectives and safety, function, appearance,
environmental protection and maintainability by the Code.
3. Approval of the modification request would not affect the surrounding properties.
4. As discussed above, the modification conforms to the intent and purpose of the Code.
5. The two proposed lots that will utilize the shared driveway have at least 50 linear feet of
public right-of-way. The shared driveway will be less than 200 feet in length. In addition, the
shared driveway is strictly provided for rear lot access on the lots. As discussed above, there
is no other way to provide rear access while still maintaining the number of lots. Thus, a
shared driveway has been chosen to provide the rear access.
6. Approval of the modification would not create adverse impacts to the adjacent
properties.
9
Matthew Herrera
July 19, 2016
Page 6 of 6
Thank you for your time and consideration in this matter. Should you have any questions or
request any clarifications, please do not hesitate to contact me.
Sincerely yours,
D. R. STRONG Consulting Engineers Inc.
Yoshio L. Piediscalzi, P.E.
Project Engineer
YLPllcs
R W16101160071CorrespondencelLetters%out1L16007_160606_Matthew Herrera.docx
Sharedlnformation
From: Clark Close <CClose@Rentonwa.gov>
Sent: Thursday, February 11, 2016 1;40 PM
To: Maher Joudi
Subject: PRE16-000049 Stinde Preliminary Plat Preapp
Attachments: 16-000049 (R-8 Stinde Pre Plat) Meeting Summary.pdf
Maher,
Here is some follow-up information from your plan reviewer regarding moving the curb rather than maintaining the curb
at its current location.
Given the corridor is a dedicated bicycle corridor, transportation is not willing to allow relocation of the curb. However,
they would support a modification to reduce the sidewalk from 8 -ft to 5 -ft, which would only require 3.5 feet of
dedication in lieu of 6.5 feet.
Thanks,
Clark H. Close
City of Renton — Current Planning
Senior Planner
Tel: 425-430-7289
0
March 22, 2016
Project No. 16007
Corey Thomas
City of Renton
1055 S Grady Way
Renton, Washington 98057
Re: Stinde Preliminary Plat, PRE16-000049
Dear Mr. Thomas:
This letter is provided to formally request modification from RMC 4-6-060(H)(2). Specifically,
the request to allow use of a hammerhead turnaround, in lieu of a cul-de-sac, on a dead end
street that is greater than 300 feet in length.
Background
The Project is proposing a dead end street less than 500 feet in length from Monroe Avenue
South, east.
Variance Requested
RMC 4-6-060, Street Standards, H. Dead End Streets: For dead end streets from 300' to 500'
in length, a cul-de-sac is required. The applicant is proposing use of a hammerhead turn
around on a road that is 385 feet from the proposed curb line in Monroe Ave NE to the
centerline of the proposed hammerhead.
Per the City of Renton Variance Submittal Requirements, in order to approve a variance
request, the following four conditions must exist:
1. The applicant suffers undue hardship and the variance is necessary because of special
circumstances applicable to the subject property, including size, shape, topography, and
location or surroundings of the subject property; and the strict application of the Building and
Zoning code is found to deprive subject property owner of rights and privileges enjoyed by
other property owners in the vicinity and under identical classification.
2. The granting of the variance will not be materially detrimental to the public welfare or
injurious to the property or improvements in the vicinity and zone in which subject property is
situated.
3. Approval shall not constitute a grant of special privilege inconsistent with the limitation
upon uses of other properties in the vicinity and zone in which the subject property is situated.
4. The approval, as determined the Reviewing Official, is the minimum variance that will
accomplish the desired purpose.
624 7th Ave
Kirkland, WA 98033-5565
Phone: (425) 827-3063
Fax, (425) 827-2423
TDI€ Free (800) 962-1402
www.drslrorig.com
Engineers Surveyors i
I Planners
Corey Thomas
March 22, 2016
Page 2 of 2
Justification
1. Providing a cul-de-sac turnaround with a right of way diameter of 110 feet is more than
50% of the total property width (property width is 216 feet) and greatly encumbers usable
space. The application of a cul-de-sac would better serve properties with greater dimensions
that allow for lot access around the circumference of the cul-de-sac and allow it be utilized to
its full potential.
2. The project proposes to terminate the proposed roadway with a hammerhead which is
an acceptable emergency vehicle turnaround. Additionally, the hammerhead will meet the
required dimensional standards and be adequately signed, -No Parking).!
3. Approval of the variance request would allow for development of this plat which would
be in line with the neighboring developments in size, magnitude and density. Granting of this
variance would not constitute special privilege inconsistent with projects in the vicinity given
that the cul-de-sac turnarounds in the immediate vicinity of the project are between 80 and 90
feet in diameter. The requirement for 110 feet in diameter encumbers the property more
significantly than any developments in the vicinity.
4. Approval of the variance request is the minimum variance to accomplish the desired
purpose.
Thank you for your time and consideration in this matter. Should you have any questions or
request any clarifications, please do not hesitate to contact me.
Sincerely yours,
D. R. STRONG Consulting Engineers Inc.
MqKek A..to di, P.E.
P nci , r. Vice President
Director of Engineering
R:%2016%01160071Correspondence%Letters%out1L16007_160322_CoryThomas.doex
9
SharedInformation
From: Corey W Thomas <CThomas@Rentonwa_gov>
Sent: Wednesday, April 06, 2016 4:18 PM
To: Maher Joudi
Cc: Jamie Waltier, Chris Burrus (CBurrus@harbourhomes.com); Clark Close
Subject: RE: Stinde Preliminary Plat Hammerhead Variance Request PRE16-000049
Attachments: turnaround.pdf
Maher,
The fire chief has approved your variance request with the condition that all future homes in the entire plat shall require
an approved residential fire sprinkler system. The placement and configuration of the hammerhead turnaround shall be
a mutually agreed upon location to be determined by the planning and fire department. The hammerhead shall meet all
fire department specifications, see attached above. Contact Clark Close for exact placement of the hammerhead.
Corey Thomas
Fire Plans Reviewer/ Inspector III
City of Renton Fire & Emergency Services Department
COMMUNITY RISK REDUCTION
Phone: 425-430-7024 Fax: 425-430-7022
Email: cthomas aDrentonwa.aov
1055 South Grady Way
Renton, WA 98057-3232
Professionalism • Integrity- Leadership • Accountability • Respect
From: Maher Joudi[mai Ito: maher,joudi@drstrong.com]
Sent: Tuesday, March 22, 2016 18:33
To: Corey W Thomas
Cc: Jamie Waltier; Chris Burrus (CBurrus@harbourhomes.com)
Subject: Stinde Preliminary Plat Hammerhead Variance Request PRE16-000049
Hi Corey,
We are moving forward on this project and per your comments at the pre app, I am emailing a letter requesting
allowance of a hammerhead on a dead end road longer than 300'.
Please see attached.
Thanks Corey.
D.R. STRONG
Consulting
Engineers Inc.
CIVIL ENGINEERS PLANNERS
Maher A. Joudi, P.E.
Principal, Sr. Vice President
Director of Engineering
620 7th Avenue
Kirkland, WA 98033
Office: (425) 827-3063
0 0
GTC- Gibson Traffic Consultants, Inc.
.,
MEMO ANDUM
This memorandum summarizes the trip generation calculations for the Stinde Development. The
development is located on the east side of Monroe Avenue NE, south of NE l0th Street. The
development is proposed to replace two existing single-family residential units with 14 single-family
residential units, a net increase of 12 single-family residential units. A site vicinity map in included
in Figure 1.
Figure 1: Site Vicinity
2802 Wetmore Avenue • Suite 220 • Everett WA, 98201
TO: 425-339-8266 • Fax: 425-258-2922 • E-mail: info@gibsontraffic.com
i p,MES
,
�
�pf WAS&��� �0
To:
Chris Burrus, Harbour Homes, LLC
From:
Brad Lincoln, PE
Project:
Stinde Development
? J
GTC #16-073
4zso-1
Subject:
Traffic Analysis
Date:
July 14, 2016
This memorandum summarizes the trip generation calculations for the Stinde Development. The
development is located on the east side of Monroe Avenue NE, south of NE l0th Street. The
development is proposed to replace two existing single-family residential units with 14 single-family
residential units, a net increase of 12 single-family residential units. A site vicinity map in included
in Figure 1.
Figure 1: Site Vicinity
2802 Wetmore Avenue • Suite 220 • Everett WA, 98201
TO: 425-339-8266 • Fax: 425-258-2922 • E-mail: info@gibsontraffic.com
Stinde Development Trip Generation Memo
Trip Generation Calculations
The trip generation calculations for the Stinde Development arc based on data contained in the
Institute of Transportation Engineers' (ITE) Trip Generation Manual, 91' Edition Volume 2: Data
(2012). The average trip generation rates for ITE Land Use Code 210, Single -Family Detached
Housing, have been used for the trip generation calculations for the proposed 14 -unit development.
Table 1 summarizes the trip generation calculations.
Table 1: Trip Generation Calculations
12 New
Single -Family
Average Daily Trips
AM Peak -Hour Trips
PM Peak -Hour Trips
Units
Inbound
Outbound
Total
Inbound
Outbound
Total
Inbound
Outbound
Total
Generation Rate
9.52 trips per unit
0.75 trips per unit
1.00 trips per unit
Splits
50%
501/16
100%
1 25%
75%
100%
1 63%
37%
100%
Trips
57
57
114
1 2
7
9
1 8
4
12
The Stinde Development is expected to generate 114 new average daily trips with 9 new AM peak -
hour trips and 12 new PM peak -hour trips. The ITE data for Land Use Code 210 is included in the
attachments.
Trip Distribution and Impacts
It is anticipated that trips generated by the Stinde Development will split 60% traveling to and from
the north and 40% traveling to and from the south along Monroe Avenue. The development will
impact off-site City of Renton intersections with less than 10 peak -hour. Additional analysis of
impacts to surrounding intersections should therefore not be required based on City of Renton
threshold requirements.
Gibson Traffic Consultants, Inc. July 2016
info@gibsontraffic.com 2 GTC #16-088
11
ITE Trip Generation Data
Agle-Family Detached using
(210)
Average Vehicle Trip Ends vs: Dwelling Units
On a: Weekday
Number of Studies: 355
Avg, Number of Dwelling Units: 198
Directional Distribution: 50% entering, 50% exiting
Trip Generation per Dwelling Unit
Average Rate Range of Rates Standard Deviation
9.52 4.31 - 21.85 3.70
Data Plot and Equation
30,000
20,000
10,000
0
0 1000
X = Number of Dwelling Units
X Actual Data Points Fitted Curve
Fitted Curve Equation: Ln(T) = 0.92 Ln(X) + 2.72
296 Trip Generedon, 9th Edition • institute of Transportation Engineers
2000 3000
------ Average Rate
R2 = 0.95
A -]
X
yf i r
. - - . - - - - . -
X
/
f
X
;
X
,
----
-- ----
-- -- -•-
- ;-----------
......
X
X
X
;
X
0 1000
X = Number of Dwelling Units
X Actual Data Points Fitted Curve
Fitted Curve Equation: Ln(T) = 0.92 Ln(X) + 2.72
296 Trip Generedon, 9th Edition • institute of Transportation Engineers
2000 3000
------ Average Rate
R2 = 0.95
A -]
f Single -Family Detached Housing
(210)
Average Vehicle Trip Ends vs. Dwelling Units
On a. Weekday,
Peak Hour of Adjacent Street Traffic,
One Hour Between 7 and 9 a.m.
r
Number of Studies: 292
Avg. Number of Dwelling Units: 194
Directional Distribution: 25% entering, 75% exiting
Trip Generation per Dwelling Unit
Average Rate Range of Rates Standard Deviation
0.75 0.33 - 2.27 0.90
Data Plot and Equation
3,000
2,000
1,000
0
0 1000 2000 3000
X = Number of Dwelling Units
X Actual Data Paints Fitted Curve ------ Average Rate
Fitted Curve Equation: T = 0.70(X) + 9.74 R2 = 0.89
A-2
Trip Generation, 9th Edition 4 Institute of Transportation Engineers 297
Agle-Family Detached 06using
(21 D}
Average Vehicle Trip Ends vs: Dwelling Units
On a: Weekday,
Peak Hour of Adjacent Street Traffic,
One Hour Between 4 and 6 p.m.
Number of Studies: 321
Avg. Number of Dwelling Units: 207
Directional Distribution: 63% entering, 37% exiting
-rip Generation per Dwelling Unit
Average Rate Range of Rates Standard Deviation
1.00 0.42 - 2.98 1.05
usita Piot ana
3,000
2,000
1,000
0 1000zaoo3000
X = Number of Dwelling Units
X Actual Data Points Fitted Curve ------ Average Rate
Fitted Curve Equation: Ln(T) = 0.90 Ln(X) + 0.51 R2 = 0.91
298 Trip Generation, 9th Edhion o Institute of Transportation Engineers
A-3
0 9
( rs rllrve lcqnrj"(�'-)e 1
550 S,. 870 V—)rr)e rive:: bJE Renityn
July 17, 2016
Jamie Waltier
Chris Burrus
Harbour Homes
1441 N. 34th Street, Suite 200
Seattle, WA 98103
Site: 850 & 870 Monroe Ave NE
Renton, Ave
TPN: 0923059117 & 0923059116
Square feet: 107,157
Dear Jamie:
Thank you for requesting my services. On April 26th, 2016, I visited the site located above in Renton,
WA to perform a Visual Risk Assessment (VRA) for all significant trees onsite as well as, those offsite
trees with driplines that might extend over the site. The information gathered is included in this report
and is a necessary part to be included with the proposal to short plat.
In summary:
Tree Calculations
Total number of trees
57
Trees
Total number of exempt trees ROW + Non-viable
32
Trees
Total number of viable trees
25
Trees
Total number of trees removed for construction
16
Trees
Total number of retained trees
9
Trees
Required 30% retention 25 X 30%=
7.5
Trees
I have included a detailed report of my findings. If you have any questions please call me. I can be
reached on my cell phone: 425.890.3808 or by email: sprince202@aol.com.
Warm regards,
Susan Prince
Creative Landscape Solutions
ISA Certified Arborist: PN #1418A
TRACE Certified Arborist: #418
17518 NE 119th Way
Redmond, WA 98052
* Per city of Renton Municipal Code, a significant tree is one whose Diameter at Breast Height (DBH) is 6" or greater
Ll
EA
atIVe 2
850 �, S 7 ', ,Ioin, o e AV,, NF, i:entc
Personal qualifications, scope of work and methodology
My examination was limited to a visual one, and did not involve any root excavation, trunk or limb coring,
or any soil testing. To evaluate the trees and prepare the report, I drew on my formal college education
in botany, preparation and training used to obtain my ISA certification in addition to my certification as a
Tree Risk Assessor. I have been an ISA Certified Arborist for over fifteen years and have been
TRACE/TRAQ certified for four years.
I followed protocol delineated by the International Society of Arboriculture (ISA) for Visual Risk
Assessment (VRA). By doing so, I am examining each tree independently as well as collectively as groups
or stands of trees provide stability and can lower risk of independent tree failure. This scientific process
examines tree health (e.g. size, vigor, insect and disease process) as well as site conditions (soil moisture
and composition, amount of impervious surfaces surrounding the tree etc.)
Introduction:
Identifying and managing the risks associated with trees is still largely a subjective process. Since the
exact nature of tree failures remains largely unknown, our ability as scientists and arborists to predict
which trees will fail and in what fashion remains limited. As currently practiced, the science of hazard
tree evaluation involves examining a tree for structural defects, including genetic problems, those caused
by the local environmental that the tree grows in and those attributed to man (pruning etc.),
The assessment process involves evaluating three components: 1) a tree with the potential to fail, 2) an
environment that may contribute to that failure, and 3) a person or object that would be injured or
damaged (the target), By definition a defective tree cannot be considered hazardous without the
presence of a target.
All trees have a finite life -span though it is not pre-programmed internally in the same manner as annual
plantings. As trees age they are less able to compartmentalize structural damage following injury from
insects, disease or pruning. Trees in urban settings have a shorter life span than trees grown in an
undisturbed habitat.
Different species of trees grow differently. Evergreen trees have a "reputation" of growing slowly and
defensively. These trees allocate a high proportion of their resources to defending themselves from
pathogens, parasites and wounds. As a rule, trees with this type of growth tend to be long lived. Though
like all other living things, they have a fairly predictable life span. Examples of this type of tree include
the northwest Pseudotsuga menziesd - Douglas fir, and Thuja plicata - Western red cedar.
Deciduous trees are trees that annually shed leaves or needles. These trees have a tendency to grow
quickly and try to "outgrow" problems associated with insects, disease and wounds. They allocate a
relatively small portion of their internal resources to defense and rely instead upon an ability to grow
more quickly than the pathogens which infect them. However, as these trees age, their growth rate
declines and the normal problems associated with decay begins to catch up and compromise the tree's
structural integrity. Examples of this type of tree include Salix, Populus and Alnus.
Knowledge of the growth and failure patterns of individual tree species is critical to effective hazard
analysis. Species vary widely in their rates of failure. The hazard tree evaluation rating system used by
most arborists was developed by the Colorado Urban Forest Council and recognizes this variation in
species failure and includes a species component as part of the overall hazard evaluation.
Site Observations:
The site is located South of NE 14th Street immediately off Monroe Ave NE
Method's used to determine tree location and tree health:
Trees were identified previously by numbered aluminum tags attached to the western side of the tree. All
of the trees on site were examined using the Matheny and Clark' criteria for determining the potential
hazard of trees in an urban environment as well as the Tree Risk Assessment in Urban Areas and The
Urban/Rural Interface by Julian Dunsterz. Tree diameters were measured at DSH (diameter standard
height — 4.5' above ground) using a logger's tape. Tree dripiines were measured using a PRO Laser
RangefinderTm-
9
C reg 7itivc• I ;° nrisrape Solt ;t: 3, s 3
850 & h7G I,',.;nm . Avc `VES,
Spreadsheet Legend:
1. Tree tag #: Numbered aluminum tags attached to the trees in the field*'
2. Species: The Latin and common name five a tree
3. Species: Species ID: Spreadsheet contains common names of trees which correspond to scientific
names as follows:
• Apple: Malus sp.
• American sycamore: Plantanus
occidentalis
• Austrian pine: Pinus nigra
• Bigleaf maple: Acer macrophyllum
• Birch: Betula nigra
• Bitter Cherry: Prunus emarginata
• Blue atlas cedar: Cedrus atlantica
'Glauca'
• Cedar: Thuja plicata
• Cherry: Prunus sp.
• Dawn redwood: Chamaecyparis
nootkatensis
• Deodora cedar: Cedrus deodare
• Colorado blue spruce: Picea pungens
• Cottonwood: Populus trichocarpa
• Dogwood: Comus nuttallii
• Douglas fir: Pseudotsuga menriesii
• English laurel: Prunus laurocerasus
• Filbert: Corylus avellana var.
• Grand fir: Abies grandis
• Hemlock: Tsuga hetmphylla
• Holly: Ilex aquifolium
• Japanese maple: Acer palmatum
• Leylandii cypress: Cupressocyparis
leylandii
• Lodgepole pine: Pinus contorta
• Mountain ash: Sorbus americana
• Nobel fir: Abies procera
• Pear: Pyrus sp.
• Plum: Prunus
• Red Alder: Alnus rubra
• Red maple: Acer rubrum
• Walnut: Juglans sp.
• Western red cedar: Thuja plicata
• Weeping Alaska cedar: Metasequoia
glyptostrobides
• White fir: Abies concolor
• White pine: Pinus strobes
4. DBH: Diameter of the tree measured at 42" above grade
5. Adjusted Diameter of the tree: Calculated equivalent for multi -stemmed tree
6. Dripline Radius: Measurement in feet of the tree canopy from tree trunk to outermost branch tip
7. Health: A measurement of overall tree vigor and vitality rated as excellent, good, and fair or poor
based on an assessment of crown density, leaf color and size, active callusing, shoot growth
rate, extent of crown dieback, cambium layer health, and tree age
• Excellent: Tree is an ideal specimen for the species with no obvious flaws
• Good: Tree has minimal structural or situational defects
• OK: Tree has minimal structural defects AND minimal environmental concerns
• Fair: Tree has structural or health issues that predispose it to failure if further stressed
• Poor: Tree has significant structural and/or health issues. It is exempt from total tree count.
S. Defects/Concerns: A measure of the tree's structural stability and failure potential and rated as
good, fair or poor based on assessment of specific structural features, eg., decay, conks, co-
dominant trunks, included bark, abnormal lean, one-sided canopy, history of failure, prior
construction impact, pruning history, etc..
9. Proposed action:
• Retain
• Remove due to viability
• Remove due to planned development (tree is otherwise healthy)
10. Limits of disturbance: The area surrounding the tree that defines the area that surrounds the
trunk that cannot be encroached upon during construction. This may be a multiple of the trunk
diameter (1 -1.5 times the trunk diameter converted to feet.) or it may be related to the width
of the canopy. It is always determined by tree species and environment and is up to the
discretion of the ISA Certified Arborist to determine
11. Value. The value the municipality assigns a tree with the specific DBH, species or location of the
assessed tree
[J
Specific Tree Observations:
9
Creotive Lands- pe Soli -Lion; 4
850 & 870 Monroe lode NE, Renton
1
2 I
3
4
5
6
7
8
9
10
CRZtTPZILOD
Proposed Action
Radius In feet
4P
_
Tag
Species ID
Dpi
inches
1
DBH
Drip -
line
Radius:4
Health
Defects/Comments
=
a
A
E
$
a
#
Incises
feet
v
F
N
W
E
5
ow
z
a:
Co -dominant leaders with
9 5
included bark x4 @ 3',
1
913
Cherry
S b
13.5
7
OK
typical of species, column of
1
7
7
7
7
decay, cavity @ root crown
to 3' on north
Typical of species, column of
decay 4' to 10' on west, dead
2
914
Madrona
12
12
19
OK
wood, leaf blight, typical of
1
19
19
19
19
species, non self -corrected
lean to west
Typical of species, dead
3
915
Douglas fir
17
17
10
Goad
wood, dead twigs, moss and
1
10
10
10
10
lichen, crack @ Yon east
Elongated branches, previous
top loss, red ring rot,
abnormal bark, shedding
4
916
Douglas fir
38.5
36.5
25
OK
bark, carpenter ants, dead
1
25
25
25
25
wood, exposed roots, huge
wound @b 6' to 14' on west,
epicormic branch formation
Dead spur @ root crown,
Bigleaf
typical of species, column of
5
917
maple
9
9
10
Poor
decay @ 2' to 10' on east,
1
10
10
10
10
column of decay @ 15' to 18'
on east
Creative Landscape Solutions
850 & 870 Monroe Ave NE, Rertarl.
1
2
3
4
5
6
7
8
9
, 10
Proposed Action
CR2jrPZ/LPD
Radius In feet
Tree
Adj
Drip-
u
#
T#
Species ID
nch I
Radius
Health
DefecWComments
r_
p
n
Inches
feet
g
EF
X
N
IN
E
S
"
o
z
Previous top loss, suppressed
6
918
Douglas fir
13
13
8
Fair
canopy, no taper, slight self-
1
8
8
8
8
corrected lean to south
Exposed roots, typical of
species, serpentine trunk,
7
919
Cottonwood
21
21
15
Fair
dead wood, broken branches,
1
15
15
15
15
moss and lichen, cavity
root crown to 2' on south,
girdled root
Co -dominant leaders with
8
920
Douglas fir
14,9
16.5
13
Fair
included bark x2 @ 1',
1
13
13
13
13
asymmetric canopy to east &
west, OK in grave
Suppressed canopy, co-
dominant leaders with
9
921
Douglas fir
11
11
12
Fair
included bark x2 0 30', dead
1
12
12
12
12
wood, broken branches, thin
canopy, OK in grove
10
922
Bigieaf
10
10
1D
OK
Exposed roots, typical of
1
10
10
10
SO
maple
species
11
923
Douglas fir
17
17
15
Good
Typical of species
1
15
15
15
15
Co -dominant leaders with
included bark x3 @ 2', 1
i6
dead, cavity on south @ root
12
924
TI alplef
6
15
15
OK
crown to 7', dead woad,
1
15
15
15
15
broken branches, low live
crown ratio, hanger, typical
of species, OK In grove
13
925
Filbert
10
10
15
Fair
Failing to north, typical of
1
15
15
15
iS
species
r
Creative landscape Solutions
850 & 870 Monroe Ave NE, Renton
1
2
3
4
5
6
7
B
9
10
Proposed Action
CRZfrPZ/LOD
Radius In feet
Tree
Dches
1
Dip-
ne
m
#
Tag
Species ID
Id
DBH
Rai us
Health
Defecl*Comments
f
Inches
feet
y
v
F
N
w
E
S
cc
c
Z
w
Broken branches, dead
twigs, some sap, moss and
14
926
Douglas fir
is
15
t0
OK
lichen, low live crown ratio -
1
10
10
10
10
20%, OK in grove, free
flowing sap, crack @ 6'
Bigleaf
Suppressed canopy, low live
15
927
maple
8
8
12
OK
crown ratio - 15%, typical of
1
12
12
12
12
species
Bigleaf
Suppressed canopy, low live
16
928
maple
9
9
12
OK
crown ratio - 15%, typical of
1
12
12
12
12
species
Ivy to 15', elongated
branches, asymmetric
17
929
Douglas fir
15
15
15
Fair
canopy to south, dead twigs,
1
15
15
15
15
previous top loss, OK in
grove
Typical of species, 1 leader
failing to north, co -dominant
leaders with included bark x2
18
930
Cottonwood
40
40
22
Fair
@ 6', carpenter ants, decay
1
22
22
22
22
@ root crown to 6' on west
with carpenter ants,
woodpecker activity, fallen
onto Douglas fir #929
Co -dominant leaders with
Bigleaf
included bark x5 @ 6',
19
931
maple
37
37
20
OK
exposed roots, dead wood,
1
20
20
20
20
dead scaffold, typical of
species
0
0
Creative Lardscape Solutiors 7
850 & 870 Monroe Ave NE, Renton
1
2
3
4
5
6
7
8
9
10
Proposed Action
CRZ/TPZ/LOD
Radius in feet
Tree
Tag
Tag
Species ID
DBH
1
D8H
rip
Drip-
line
Health
Defects/Comments
inches
Rad
#
Inches
feet
'
N
W
E
S
z
Exposed roots to south,
20
934
f Cottonwood
22
22
22
OK
decay on east @ root crown,
1
22
22
22
22
typical of species
21
935
I Cottonwood
10
10
14
OK
Typical of species
1
14
14
14
14
Typical of species, trunk
growing to tree @ 1', co -
22
936
Cottonwood
30
30
15
OK
dominant leaders with
1
15
15
15
15
included bark x2 @ 15', dead
spur @ 15'
Spur @ 3' on east, column of
decay @ root crown to 9' on
23
937
Cottonwood
40
40
20
Fair
east, carpenter ants,
1
20
20
20
20
woodpecker activity, typical
of species, previous top loss
Self -corrected lean,
24
943
Cottonwood
18
18
8
Good
serpentine trunk, asymmetric
1
8
8
8
B
canopy to north, typical of
species
25
944
Cottonwood
20
20
10
Good
Typical of species
1
10
10
10
16
Bulge @ 4' on south, free
flowing sap, vertical crack on
26
945
Douglas fir
36
36
12
Fair
west, decay, carpenter ants,
1
12
12
12
12
abnormal bark, popping
baric, hanger
0
0
Cfeative Landscape Solutions
850 & 870 Monroe Ave NE, Renton
1
2
3
4
5
6
7
8
9
10
Proposed Action
CR7-/TPVLOD
Radius In feet
#
Tree
TagSpedes
ID
DBH
1
DBH
Drip-
line
Health
Defects/Comments
a
'8
Inches
Radius
c
A
a
Inches
feet
y
a
y
E
N
W
E
5
eC�u
x
Free flowing sap, vertical
crack on south @ 6', dead
27
946
Douglas fir
19
19
12
Fair
wood, broken branches,
1
12
12
12
12
through and through crack,
previous top loss, branch
dieback
Poor pruning with decay,
28
947
Douglas fir
11
it
11
OK
suppressed canopy, freeflowing
1
11
11
11
11
sap, previous top
loss, dead wood, OK I grove
Broken branches, dead
twigs, low live crown ratio -
15%, asymmetric canopy to
29
948
Douglas fir
14
14
6
OK
west, previous top loss, dead
1
6
6
6
6
wood, healed wound @ 1' to
3' on south, carpenter ants
bark only, OK In grove
Abnormal bark, shedding
bark, asymmetric canopy to
west, previous top loss, dead
30
949
Douglas fir
37
37
11
Fair/OK
wood, dead twigs, broken
1
11
11
11
11
branches, column of decay
on west @ root crown to 9',
OK in grove
Abnormal bark, shedding
31
950
Douglas fir
9
9
6
Fair
bark, popping bark, previous
1
6
6
6
6
top loss, asymmetric canopy
to south, bulge @ 3'
•
Creative Ld:idscape Soljtions
850 & 870 Morroe Ave NE, Perror
I
2
3
4
5
6
7
$
9
i 10
CRZ/TPZ/LOD
Proposed Action
Radius In feet
Tree
D
Adj.
Dnp
ine
u
I
41
Tag
Species ID
Inches
DD5H
Radius
Health
Defects/Comments
Inches
feet
'
F
H
W
E
5
z
�
Previous top loss, low live
!
crown ratio - 10%, dead
32
951
Douglas fir
9
9
I 4
Fair
woad, broken branches,
1
4
4
4
4
stress blisters, healed wound
@ Ton north, OK in grove
Co -dominant leaders with
included bark x2 @ root
crown, previous top loss, low
33
952
Douglas fir
19,
22.5
8
Fair
live crown ratio - 15%,
1
8
8
8
8
12
asymmetric canopy to west &
east, free flowing sap,
carpenter ants bark only, OK
in grove
Free Flowing sap, typical of
species, poor pruning with
34
953
Douglas fir
34
34
16
Fair/OK
decay, asymmetric canopy to
1
16
16
16
16
east, crack on west @ 9', ivy
to 6', carpenter ants
Co -dominant leaders with
included bark x2 reduced to
1 @ 3', large column of
35
954
Douglas fir
24
24
13
Fair
decay to west, carpenter
1
13
13
13
13
ants, woodpecker activity,
asymmetric canopy to south,
some stress coning, OK in
grove
11
Cl
Creative Landscape Solutions 10
850 & 870 Monroe Ave NF, Renton
1
2
j 3
4
5
6
7
8
9
10
Proposed Action
CRZn?7/LOD
Radius in feet
Tree
DBH
1
Drip -
line
# #
Tag
Species TO
Inches
DBH
Radius
Health
Defects/Comments
m
a
#
Inches
feet
a
y
E
N
W
E
5
z
Ca -dominant leaders with
included bark x2 @ 9',
36
955
Douglas fir
36
36
9
OK
woodpecker activity,
1
9
9
9
9
carpenter ants, abnormal
bark, shedding bark, typical
Of species, OK in grove
Dead wood, broken
37
956
Douglas fir
27
27
11
Fair
branches, thin canopy,
1
11
ii
11
11
declining, previous top loss,
dead twigs
Typical of species, broken
38
958
Douglas fir
33
33
8
OK
branches, dead wood, crack
1
6
8
8
8
@ 9' on east, free flowing
sap
Non self -corrected lean to
north, vertical cracks, low
39
959
Douglas fir
14
14
7
Fair
live crown ratio - 20%,
1
7
7
7
7
suppressed canopy, dead
wood, healed wound @ Yon
south
Typical of species, epicormic
40
960
Douglas fir
29
29
12
OK
branch formation 9 18',
1
12
12
12
12
carpenter ants, abnormal
bark, shedding bark
41
961
Douglas Fr
28
2$
10
OK
Limbed for power lines on
1
iD
14
10
10
west typical of species
9
Creative La"dscape 11
850 & 870 Monroe Ave NE, Renton
1
2
3
4
5
6
7
8
9
10
Proposed Action
CRZ/TPZ/LOD
Radius In feet
#
T g '
Spedes ID
DBH
Inches
DBF1
gyp-
Iln
Radus
I
Health
Defects/Comments
v
a
E
#
Inches
feet
y
a
E
N
W
E
S
Z
Broken branches, dead
twigs, abnormal bark,
42
962
Douglas fir
23
23
9
OK
shedding bark, Carpenter
1
9
9
9
9
ants, typical of species,
previous top loss, Ok in
grove
Typical of species, co -
43
963
Holly
7, 5
I 8.5
6
OK
dominant leaders with
1
6
6
6
6
included bark x2 @ root
crown
44
965
Cherry
8
8
12
OK
Typical of species
1
12
12
12
12
Typical of species, previous
45
966
Douglas fir
33
33
12
OK
top loss, dead wood, dead
1
12
12
12
12
twigs
Typical of species, dead
wood, broken branches,
46
967
Douglas fir
25
25
10
Fair
abnormal bark, popping
1
10
10
10
10
bark, carpenter ants,
woodpecker activity,
horizontal crack @ 6' on east
Shedding bark, carpenter
ants, exposed roots,
abnormal bark, broken
47
968
Douglas fir
34
34
13
Fair
branches, sap, blisters,
1
13
13
13
13
wound @ 15' on north,
woodpecker activity,
elongated branches
Cc -dominant leaders with
48
969
Beech
9,9
12.5
9
Fair
included bark x2 @ root
1
9
9
9
9
crown, topped multi times @
2', weak laterals, 2 pictures
s
•
Creative Landscape Sol,,tions 12
650 & 876 Munroe Ave NE. Rentor
1
z
3
4
5
6
7
e
9
is
CRZ/TPZ/LOD
Proposed Action
Radius In feet
AtTag
Species 19
DBFE
1
D5H
Drip-
line
Health
pefects/Gomments
Inches
Radius
e
R
g79
#
Inches
feet
y
v
E N
W
E
5
L
'6
z
Decay throughout,
49
970
Apple
16
16 11
12
Poor
sapsucker, ants, poor
1
12
12 'I
12
12
pruning with decay
i
I
1 picture, co -dominant
Italian
28,
I
leaders with included bark x5
50
975
plum?
32
42.5
11
Fair
C 6', dead wood, typical of
1
11
11
11
11
species, vertical crack on
east, twisted trunk
51
976
Cottonwood
21
21
11
OK
$elf -corrected lean to west,
1
11
11
11
11
typical of species
One side failed, co -dominant
leaders with included bark x3
52
977
Cottonwood
21
21
14
Poor
C root crown reduced to 2,
1
14
14
14
14
large lateral branch V 12'
with decay
Omamental
Co -dominant leaders with
53
978
plum
7,4
8
12
OK
included bark x2 0 2',
1
12
12
12
12
typical of species
Multi failures, co -dominant
54
979
Beech
35
35
14
Poor
leaders with included bark x6
1
14
14
14
14
@ 6'
Co -dominant leaders with
55
980
Cottonwood
15
15
8
Poor
included bark x2 reduced to
1
8
8
8
8
1, failing on north
56
981
Sigleaf
9
9
9
Ok
Typical of species
1
9
9
9
9
maple
57
983
Maple
13
13
15
OK
Tey to 25', "heavy", OK if ivy
1
15
15
15
15
removed
57 9 17 15 16
E
Offsite Potentially Impacted trees:
1J
Creative Landscape Solutions 13
850 & 870 Monroe Ave NE, Rentor
1
2
3
4
1 5
6
7
6
9
10
Proposed
CRZfrPZ/LOD
Action
Radius feet
#
Tree
Tag
Species
ID
DBH
inches
DSI
Drip -line
Radius feet
Health
Defects/Comments
n
a
7
#
inches
N
W
E
5
x
Co -dominant leaders
with included bark x6 @
root crown reduced to
11,
2, scaffolds dead,
1
901
Dogwood
7' 6,
20.5
24
OK
shedding bark,
1
I
24
24
24
24
9, 7,
abnormal bark, decay,
9
carpenter ants, topped
for power lines, moss
and lichen, typical of
species
Western
2
902
red
10
10
14
Good
Typical of species
1
14
14
14
14
cedar
Douglas
Previous top loss, tip
3
903
fir
13
13
14
OK
dieback, typical of
1
14
14
14
14
species
Western
Co -dominant leaders
4
904
red
9,9
12.5
14
OK
with included bark x2
1
14
14
14
14
cedar
root crown, typical of
species
5
905
Holly
8
8
6
OK
Poor pruning with
1
6
6
6
6
decay, ical of species
Co -dominant leaders
6
906
maple
i0' 7
14.5
18
OK
with included bark x3 @
1
18
18
18
18
3', typical of species
Douglas
Vertical crack on east @
7
907
fir
17
17
14
OK
22', moss and lichen,
1
14
14
14
14
dead wood, dead twigs
0
9
Creative Landscape Snlutinns 14
850 & 370 Monroe Ave NE. Renton
1
2
3
4
5
6
7
1 8
4
10
Proposed
CRZf PZ/LOD
Action
Radius feet
#
Tree
Tag
SpeGes
DBHAdj'
DBH
Drip -line
Health
Defects/Comments
#
ID
Inches
inches
Radius feet
y
n
o
m
}
E
N
w
E
5
7
G
C
Z
Topped, decay in one
Western
leader, carpenter ants,
8
908
red
13
13
A
OK
woodpecker activity, co-
1
10
10
10
10
cedar
dominant leaders with
included bark x3 @ 18'
Western
Previous top loss,
9
909
red
12
12
9
Good
typical of species
1
9
9
9
9
cedar
Co -dominant leaders
with included bark x2 @
Douglas
20' reduced to 1, low
10
910
fir
16
16
12
Fair
live crown ratio, free
1
12
12
12
12
flowing sap, dead wood,
dead twigs, horizontal
crack @ 6'
Broken branches, dead
twigs, suppressed
11
911
Douglas
13
13
8
Fair
canopy, low live crown
1
6
8
8
8
fir
ratio - 20%, dead wood,
previous top loss,
wound @ Von north
Typical of species, dead
wood, co -dominant
Douglas
leaders with included
12
912
flr
17
17
10
OK
bark x2 reduced to 1 @
1
10
10
10
10
18', hanger, wound
healed @ root crown on
north
Western
Typical of species,
13
932
red
58
58
13
Good
woodpecker activity,
1
13
13
13
13
cedar
carpenter ants
0
0
CreaLive Lardscape Sclutior, 1s
850 & 870 Monroe Ave NE, Renton
1
2
3
4
5
6
7
8
9
10
Proposed
cRzrmz/LGD
Action
Radius feet
#
Tree
Tag
Species
ID
DBH
Inches
Adj.
D8H
Drip -line
Radius feet
Health
Defects/Comments
a
T
a
#
inches
A
y
$
E
N
W
E
5
Asymmetric canopy to
14
933
Spruce
11
11
1' over
OK
south, dead wood, dead
1
1
1
1
1
fence
twigs, lean to south,
non -self -corrected lean
Douglas
Typical of species,
15
938
fir
38
38
16
Good
wound @ 6'to Won
1
16
16
16
16
south
Failing to west, typical
16
939
Filbert
13
13
12
Fair
of species, OK in grove,
1
12
12
12
12
fence line @ 2' on east
Cavity on west, co -
17
940
Beech
8' 9,
15.5
12
Poor
dominant leaders with
1
12
12
12
12
to
included bark x3 @ root
crown
18
941
1 Slack
locust
28
28
18
Good
Typical of species
1
18
18
18
18
Poor pruning with
Douglas
decay, previous top
19
942
fir
10
10
7
OK
loss, dead wood, broken
1
7
7
7
7
branches, typical of
species
20
957
Madrona
18
18
6
Excellent
Typical of species
1
6
6
6
6
(Within Existing ROW)
Douglas
Crack @ 9' on south,
21
964
fir
30
30
12
OK
free flowing sap, typical
1
12
12
12
12
of species
22
971
Norway
14
14
14
OK
Asymmetric canopy to
1
14
14
14
14
maple
west typical of species
Il
Creative Landscape Solutions 16
650 & 870 Monroe Ave NE, Renton
1
2
3
4
5
6
7
8
9
10
Proposed
CP2/TP2/LOD
Action
Radius feet
#
Tree
Tag
Species
DOH
Adj,
DSH
Drip -line
Health
DefecWCommentsa
m .
u
#
1D
Inches
inches
Radius feet
9
'o
?
E
N
W
E
5
a
2
Co -dominant leaders
23
472
Japanese
14,
20
7
Fair
with included bark x2
i 1
7
7
7
7
maple
14
5', multi toppings @ 7'
to 12'
Norway
Poor pruning with
24
973
maple
20
20
1s
OK
decay, cavity on east @
i
i5
i5
1s
is
12', typical of species
Self -corrected lean to
25
974
Norway
24
24
16OK
east, poor pruning with
I
16
16
16
16
maple
decay, dead wood,
broken branches
Co -dominant leaders
26
982
Bigleaf
12,
18.5
12
OK
with included bark x2 @
1
12
12
12
12
maple
14
4', ivy to 25', dead
wood, broken branches
Western
Co -dominant leaders
27
984
red
28
28
12
OK
with Included bark x2 @
1
12
12
12
12
cedar
6', typical of species
Western
18
Co -dominant leaders
28
985
red
12
21.5
12
OK
with included bark x2 @
1
12
12
12
12
cedar
2', typical of species
western
Co -dominant leaders
29
986
red
22
22
12
OK
with included bark x2 @
1
12
12
12
12
cedar
T, pical of species
Western
Co -dominant leaders
30
[987
red
i�'
20
12
OK
with Included bark x3 @
1
12
12
12
12
cedar
I 1
1
6', typical of species
C:reaI,IVe La I(j ; rip- ol,!tiors 17
37,0 &_ s, 0 vor:r,,.. r.v4 r'�I Fenton
Site map (See also architect or civil plans):
Discussion/Calculations/Conclusion:
This two parcel site has two homes that appear to be circa 1940's and several sheds and out-
buildings. A grove of older Douglas fir trees is growing on the northwest portion of the lots. The
healthiest of these trees will be retained as a grove and is identified as "TRACT A" on the tree
preservation plan. The southwestern part of the grove will be removed to allow for site access by a
public street.
Based on the relative youth of the pioneer species of trees (Red alders and Cottonwood's) that now
inhabit the eastern side of the sites, it appears that this area was cleared of trees except for a small
orchard of fruit trees; these trees are proposed to be removed for eventual building sites.
Tree Calculations
Total number of trees
57
Trees
Total number of exempt trees ROW + Non-viable
32
Trees
Total number of viable trees
25
Trees
Total number of trees removed for construction
16
Trees
Total number of retained trees
9
Trees
Re uired 30% retention 25 X 30%=
7.5
1 Trees
Currently, there on a total of 57 onsite trees. There are seventeen (17) non-viable trees and fifteen
(15) exempt trees.
Of the twenty five (25) viable trees remaining in the tree count, sixteen (16) are proposed to be
removed for overall site improvements. Nine (9) trees are proposed for retention, located in two
areas. The first is a grove located on the northwest portion of the sites and referred to as "TRACT A,"
and contains eight trees. Also located in this tract, though not healthy enough to be counted as
retained is tree #959, a Douglas fir failing to the north. It is recommended that the tree be retained in
the grove, though cut to habitat height.
Tree number 978 will be retained on the east side of the property with a connecting canopy to offsite
trees.
0
Cre:itivc: S�;Litiora 18
850 �, X 7 0 °,]or!oc Ave NE. Ler-tor:
Renton municipal code requires a tree density for properties zoned as R-8 of 2 trees/5000 square feet.
If the site doesn't contain that number of trees, they are required to be mitigated.
The two lots are a total of 107,969 square feet; 107,969/5000 = 22 X 2 (the number of required
retained trees) = 44.
The site is required to contain a minimum total number of forty-four (44) trees. Proposed
improvements retain nine (9) trees, therefore 44 —9= 35. Thirty-five (35) trees with a minimum
caliper of two (2") trees need to be replanted; or the equivalent number of caliper inches can be
replanted 32 trees X 2" = 64 equivalent inches.
The species and location of the replacement trees are shown on the Landscape Plans.
0
C`eaiiv- Solt ons 19
'n0 K 877 1 iC: lri.rC Avu JE, Denlor�
Tree Protection Fencing: Tree Protection fencing should be erected prior to any site grading
First, protect roots that lie in the path of construction. Approximately 90 to 95 percent of a tree's root
system is in the top three feet of soil, and more than half is in the top one foot. Construction activities
should be avoided in this area. Protect as much of the area beyond the tree's dripline as possible.
Some healthy trees survive after losing half of their roots. However, other species are extremely
sensitive to root damage even outside the dripline.
Do not disturb the Critical Root Zone (CRZ). The CRZ is defined by its "critical root radius." It is more
accurate than the dripline for determining the CRZ of trees growing in forests or that have narrow
growth habits. To calculate critical root radius, measure the tree's diameter (DBH) in inches, 4.5 feet
above the ground. For each inch, allow for 1 to 1.5 feet of critical root radius. If a tree's DBH is ten
inches, its critical root radius is 10 to 15 feet.
In addition to the CRZ, it is important to determine the Limits of Disturbance (LOD) for preserved
trees. Generally this is approximates the CRZ however in previously excavated areas around the
dripline the LOD may be smaller, or in the case of a tree situated on a slope the LOD may be larger.
The determination of LOD is also subject to the particular tree species. Some tree species do better
than others after root disturbance.
Tree protection is advised throughout the duration of any construction activities whenever the critical
root zone or leaf canopy many be encroached upon by such activities.
The Critical Root Zone (CRZ) or LOD should be protected with fencing adequate to hinder access to
people vehicles and equipment. Fencing detail is provided. It should consist of continuous 4 ft. high
temporary chain-link fencing with posts sec at 14' on center or polyethylene laminar safety fencing or
similar. The fencing must Contain fencing signage detailing that the tree protection area cannot be
trespassed on.
Soil compaction is one of the most common killers of urban trees. Stockpiled materials, heavy
machinery and excessive foot traffic damage soil structure and reduce soil pore space. The effected
tree roots suffocate. When construction takes place close to the protected CRZ, cover the site with 4
inches of bark to reduce soil compaction
Tree Protection fencing must be erected prior to soil excavation, boring, grading or fill operations. It
is erected at the LOD. If it is necessary to run utilities within the LOD, the utilities should be combined
into one cut, as practical. Trenching is not allowed in the LOD. In these areas boring or tunneling
techniques should be used. In the event that roots greater than 1" diameter near the LOD are
damaged or tom, it is necessary to hand trim them to a clean cut. Any roots that are exposed during
construction should be covered with soil as soon as possible.
During drought conditions, trees must be adequately watered. Site should be visited regularly by a
qualified ISA Certified Arborist to ensure the health of the trees. Tree protection fencing is the last
item to be removed from the site after construction is completed.
After construction has been completed, evaluate the remaining trees. Look for signs and symptoms of
damage or stress. It may take several years for severe problems to appear.
In the event that fencing around portions of the CRZ of a tree to be retained are not practical to erect
due to construction or obstacles, tree protection fencing should be placed three feet laterally from the
obstruction (ex. three feet back of a curb, building, or other existing or planned permanent
infrastructure.
Tree trunk protection is required where CRZ fencing is not practical. Tree trunks should be wrapped in
pine 2X4`s and accessible critical structural root zones covered with wooden pallets.
Ci(-cA'1vc LDnc;sr,,jpc SoIL11ons 20
85, & 870 N:onroc Av(2 NE, RcrAui
Glossary:
ANSI A300: American National Standards Institute (ANSI) standards for tree care
Chlorotic: discoloration caused by lack of chlorophyll in the foliage
Conifer: A tree that bears cones and has evergreen needles or scales
Crown: the above ground portion of the tree comprised of branches and their foliage
Crown raise pruning: a pruning technique where the lower branches are removed, thus
raising the overall height of the crown from the ground
DBH or DSH: diameter at breast or standard height; the diameter of the trunk measured 54
inches (4.5 feet) above grade
Deciduous: tree or other plant that loses its leaves annually and remains leafless generally
during the cold season
Epicormic: arising from latent or adventitious buds
Evergreen: tree or plant that keeps its needles or leaves year round; this means for more
than one growing season
Increment: the amount of new wood fiber added to a tree in a given period, normally one
year.
ISA: International Society of Arboriculture
Landscape function: the environmental, aesthetic, or architectural functions that a plant can
have
Lateral: secondary or subordinate branch
Limits of disturbance: The boundary of minimum protection around a tree, the area that
cannot be encroached upon without possible permanent damage to the tree. It is a
distance determined by a qualified professional and is based on the age of the tree,
its health, the tree species tolerance to disruption and the type of disturbance. It
also considers soil and environmental condition and previous impacts. It is unique to
each tree in its location.
Limited visual assessment: a visual assessment from a specified perspective such as foot,
vehicle, or aerial (airborne) patrol of an individual tree or a population of trees near
specified targets to identify specified conditions or obvious defects (ISA 2013)
Live crown ratio: the percentage of living tissue in the canopy versus the tree's height. It is
a good indicator of overall tree health and the trees growing conditions. Trees with
less than a 30% Crown ratio often lack the necessary quantity of photosynthetic
material necessary to sustain the roots; consequently, the tree may exhibit low vigor
and poor health.
Monitoring: keeping a close watch; performing regular checks or inspections
Owner/manager: the person or entity responsible for tree management or the controlling
authority that regulates tree management
0 0
( reati.e Landccorr' `.�r,l!itin 7` 21
Pathogen: causal agent of disease
Phototropic growth: growth toward light source or stimulant
ROW: Right-of-way; generally referring to a tree that is located offsite on a city easement
Reaction wood: Specialized secondary xylem which develops in response to a lean or similar
mechanical stress, it serves to help restore the stem to a vertical position
Self -corrected lean: a tree whose trunk is at an angle to the grade but whose trunk and
canopy changes to become upright/vertical
Significant tree: a tree measuring a specific diameter determined by the municipality the
tree grows in. Some municipalities deem that only healthy trees can be significant,
other municipalities consider both healthy and unhealthy trees of a determined
diameter to be significant
Snag: a tree left partially standing for the primary purpose of providing habitat for wildlife
Soil structure: the size of particles and their arrangement; considers the soil, water, and air
space
Sounding: process of striking a tree with a mallet or other appropriate tool and listening for
tones that indicate dead bark, a thin layer of wood outside a cavity, or cracks in
wood
Structural defects: flaws, decay, or other faults in the trunk, branches, or root collar of a
tree, which may lead to failure; may be genetic, or environmental
Tree credit: A number assigned to a tree by a municipality that may be equal to the
diameter of the tree or a numerical count of the tree, or related to diameter by a
factor conveyed in a table of the municipal code
Trunk area: the cross-sectional area of the trunk based upon measurement at 54 inches
(4.5 ft.) above grade
Visual Tree Assessment (VTA): method of evaluating structural defects and stability in trees
by noting the pattern of growth. Developed by Claus Mattheck (Harris, et al 1999)
detailed visual inspection of a tree and surrounding site that may include the use of
simple tools. It requires that a tree risk assessor walk completely around the tree
trunk looking at the site, aboveground roots, trunk, and branches (ISA 2013)
0
References
0
Crrativc L�:ndscr,pe SNUZion� 22
�s`.;., t� iIr} I�'r�r..r��� F,t,r=• f':F, Renton
Dirr, Michael A. Manual of Woody Landscape Plants, Their Identification, Ornamental
Characteristics, Culture, Propagation, and Uses. Champaign: Stipes Publishing
Company, 1990.
Dunster & Associates Environmental Consultants Ltd. Assessing Trees in Urban Areas and
the Urban -Rural Interface. US Release 1.0. Silverton: Pacific Northwest Chapter ISA,
2006.
Dunster, J. A. 2003. Preliminary $pecies Profiles for Tree Failure Assessment. Bowen Island:
Dunster & Associates Environmental Consultants Ltd.
Dunster, Julian A., E. Thomas Smiley, Nelda Matheny and Sharon Lilly. Tree Risk
Assessment Manual. Champaign, Illinois: International Society of Arboriculture
2013.
Harris, Richard W, James Clark, and Nelda Matheny. Arboriculture. Integrated Management
of Landscape Trees, Shrubs, and Vines. 4th ed. Upper Saddle River: Prentice Hall,
2004.
Lilly, Sharon. Arborists' Certification Study Guide. Champaign, IL: The International Society
of Arboriculture, 2001.
Matheny, Nelda and Clark, James R. A Photographic Guide to the Evaluation of
Hazard Trees in Urban Areas. Second Edition. Champaign, IL: The International
Society of Arboriculture, 1994.
Matheny, Nelda and Clark, James R. Trees and Development: A Technical Guide to
Preservation of Trees During Land Development. Champaign, IL: The
International Society of Arboriculture, 1998.
Mattheck, Claus and Breloer, Helge. The Body Language of Trees: A Handbook for Failure
Analysis. London: HMSO, 1994
Schwarze, Francis W.M.R. Diagnosis and Prognosis of the Development of Wood Decay in
Urban Trees, Australia: ENSPEC Pty Ltd. 2008
Sinclair, Wayne A., Lyon, Howard H., and Johnson, Warren T. Diseases of Trees and Shrubs.
Ithaca, New York: Cornell University Press, 1987.
Smiley, E. Thomas, Nelda Matheny, and Sharon Lilly, Tree Risk Assessment Best
Management Practices, ANSI A300 Part 9: Tree, Shrub, and Other Woody Plant
Management—Standard Practices (Tree Risk Assessment: Tree Structure
Assessment), The International Society of Arboriculture Press. Champaign. IL. 2011.
Thies, Walter G. and Sturrock, Rona N. Laminated root rot in Western North American.
United States Department of Agriculture. Pacific Northwest. Resource Bulletin PNW-
GTR-349. April 1995.
0
a
Assumptions and Limiting Conditions
Cr� itivt. I ;�ndscgl;-e �;;)lutwns 23
,t) z�87") Niorru _ f,.. Nd , k��n n
1. Any legal description provided to the consultant/appraiser is assumed to be correct. Any titles
and ownerships to any property are assumed to be good and marketable. No responsibility is
assumed for matters legal in character. Any and all property is appraised or evaluated as thou
free and clear, under responsible ownership and competent management.
2. It is assumed that any property is not in violation of any applicable codes, ordinances, statutes
or other governmental regulations.
3. Care has been taken to obtain all information from reliable sources. All data has been verified
insofar as possible; however, the consultant/appraiser can neither guarantee nor be
responsible for the accuracy of information provided by others.
4. The consultant/appraiser shall not be required to give testimony or to attend court by reason
of the report unless subsequent contractual arrangements are made including payment of an
additional fee for such services as described in the fee schedule and contract of engagement.
5. Loss or alteration of any part of this report invalidates the entire report.
6. Possession of this report or a copy thereof does not imply right of publication or use for any
purpose by any other than the person to whom it is addressed, without the prior expressed
written or verbal consent of the consultant/appraiser.
7. Neither all nor any part of the contents of the report, nor copy thereof, shall be conveyed by
anyone, including the client to the public through advertising, public relations, news, sales or
other media, without the prior expressed written or verbal consent of the consultant/appraiser
- particularly as to value conclusions, identity of the consultantlappraiser, or any reference to
any professional society or instate or to any initialed designation conferred upon the
consultant/appraiser as stated in her qualification.
8. The report and any values expressed herein represent the opinion of the consultant/appraiser,
and the consultant's/appraiser's fee is in no way contingent upon the reporting of a specified
value, a stipulated result, the occurrence of subsequent event, nor upon any finding to be
reported.
9. Sketches, diagrams, graphs and photographs in this report, being intended as visual aid, are
not necessarily to scale and should not be construed as engineering or architectural reports or
survey.
10. Unless expressed otherwise: 1) information contained in this report covers only those items
that were examined and reflects the condition of those items at the time of inspection; and 2:
the inspection is limited to visual examination of accessible items without dissection,
excavation, probing or coring. There is not warranty or guarantee, expressed or implied, that
problems or deficiencies of the plants or property in question may not arise in the future.
0 0
Re -Align Environmental
,April 21, 2016
Mr. Jamie Waltier
Harbour Homes, LLC
400 N 34th Street, Suite 300
Seattle, WA 98103
Re: Wetland Evaluation — Monroe Avenue Assemblage, Renton, WA
Dear Jamie:
This correspondence follows your request that I conduct a preliminary wetland reconnaissance on
the parcels of land (Parcel Nos. 0923059116 and 0923059117), located at 850 Monroe Ave NE in
Renton, Washington The property under investigation includes two residential parcels. (See
Attached Location and Site Maps).
Data Callection
Prior to visiting the site, online information was obtained using the Ding County iMap system, the
US Fish and Wildlife Service online National Wetlands Inventory (NWI), and the Natural Resource
Conservation Service (NRCS) online soil mapping utility.
As shown in the Attached illlap photos, no mapped streams or wetlands are shown on the site.
Similarly, these maps show no streams or wetlands within 500 feet of the site, indicating that no
buffers from off-site critical areas would affect this parcel. The attached NWI map also depicts no
streams or wetlands on, or near the site.
Also attached is the NRCS soil report for the site. As described in the soil report, the parcels appear
to be underlain by Arents, Aldetwood material, 6 to 15 percent slopes. This moderately well drained
soil is commonly found on till plains such as the Renton Highlands in which the site lies. This soil
exhibits a crater table depth of 16 -- 30 inches below the soil surface. This map unit is not typically
known to include hydric inclusions, w=hich indicates that wetlands are not typically present within the
map unit.
Fieldwork
Fieldwork was conducted on March 2, 2016 using the three -parameter approach identified in the
IVashhigton State 1Vetlands Identification and Delineation Manual (Washington Manual) (WDOE 1997) and
the Regional Sapplerreent to the Corps of 'I'nSineers Vetland Delineation Manual: IFestern Mountains, I'alleys and
Coast Region (Regional Supplement) (USA CF, 2010), which arc consistent with the _Army Corps of
Engineers IVetlands Delineation Manual (ACOP. Manual) (Ftivironmental Laboratory 1987) and other
pertinent federal and local guidance (33 CFR 3283 [a][1-5]).
During a review of the parcel boundary, I walked the perimeter of the property and found no visible
indication of drainage onto, or leaving the site. I observed that the site contains one small, very
slight, depressional area within a driveway that is approximately 30 feet wide and 30 feet long. The
depression does not drain off of the site and it appears to exist due to compaction from vehicle
Bill Granger 14056180th Ave SF. Renton, WA 90859 (206) 790-6132 Bill@re-olignenucom
0
traffic over die driveway. One soil pit was excavated in the depression, showing a silty gravelly
loam material with a Munsell color of 10YR 4/3 in the upper 0 — 8 inches and 10YR 4/4 in the
lover 8 — 16 inches. No groundwater was encountered in the soil pit and the soil does not exhibit
any indicators of wetland hydrology.
Vegetation across the site has been heavily disturbed by residential activity. The eastern — 1 /3 of the
site is heavily infested with Himalayan blackberry, as shown on the attached photos. In addition the
southeast portion of the site appears to have been the site of a building or carport, as evidenced by
an old concrete pad and numerous salvaged automobile parts.
Based upon this preliminary assessment, this site does not appear to contain any streams or
wetlands_ The site also does not appear to be included writhin any Critical Area Buffer.
Sincerely,
Re -Align Environmental
-2�>W -.0'
Bill Granger - Owner
Attachments
Bill Granger 14056180rhAve 5E Renton, WA 90859
2
(206) 790.6132 Bill@re-olignenv.com
•yam_ 4 "
rt yy
r%
lY
L � �
iA
om
JL
• *mac - -� � :.' ,a - ;,,� _'" �.
A
4.; 11• -
_ - r
'3
9
i €
,
i
m
IAt �i�:• 3 Meir - rte''
lop
d: F F
116 4
do
-�
IAC
70.
141. 7
- - ., a..+� n � 'Fid �' _ __ ., � 't '�► � -
,
R j
i
•s
. xF_
� m
N to �
G? N
Ln T6
ti E 0
Q w 1L a f1
CC i6
as �
YY Ql � � d7 C] QD AF
a`
w�W ,�cu
a�
a 11 II11
0
1 42
0
A�
cu
USDA United States
Department of
Agriculture
N RCS
Natural
Resources
Conservation
Service
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
Custom Soil Resource
Report for
King County
Area,
Washington
Renton Monroe Ave. Assemblage
April 21, 2016
Preface
Soil surveys contain information that affects land use planning in survey areas. They
highlight soil limitations that affect various land uses and provide information about
the properties of the soils in the survey areas. Soil surveys are designed for many
different users, including farmers, ranchers, foresters, agronomists, urban planners,
community officials, engineers, developers, builders, and home buyers. Also,
conservationists, teachers, students, and specialists in recreation, waste disposal,
and pollution control can use the surveys to help them understand, protect, orenhance
the environment.
Various land use regulations of Federal, State, and local governments may impose
special restrictions on land use or land treatment. Soil surveys identify soil properties
that are used in making various land use or land treatment decisions. The information
is intended to help the land users identify and reduce the effects of soil limitations on
various land uses. The landowner or user is responsible for identifying and complying
with existing laws and regulations.
Although soil survey information can be used for general farm, local, and wider area
planning, onsite investigation is needed to supplement this information in some cases.
Examples include soil quality assessments (htfp://www.nres.usda.gov/wps/portal/
nres/main/soils/health!) and certain conservation and engineering applications. For
more detailed information, contact your local USDA Service Center (http://
offices.sc.egov.usda.gov/locator/app?agency=nres) or your NRCS State Soil
Scientist (http://www.nres.usda.gov/ups/portal/nres/detail/soils/contactus/?
cid=nres142p2_053951).
Great differences in soil properties can occur within short distances. Some soils are
seasonally wet or subject to flooding. Some are too unstable to be used as a
foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic
tank absorption fields. A high water table makes a soil poorly suited to basements or
underground installations.
The National Cooperative Soil Survey is a joint effort of the United States Department
of Agriculture and other Federal agencies, State agencies including the Agricultural
Experiment Stations, and local agencies. The Natural Resources Conservation
Service (NRCS) has leadership for the Federal part of the National Cooperative Soil
Survey.
Information about soils is updated periodically. Updated information is available
through the NRCS Web Soil Survey, the site for official soil survey information.
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs
and activities on the basis of race, color, national origin, age, disability, and where
applicable, sex, marital status, familial status, parental status, religion, sexual
orientation, genetic information, political beliefs, reprisal, or because all or a part of an
individual's income is derived from any public assistance program. (Not all prohibited
bases apply to all programs.) Persons with disabilities who require alternative means
0 9
for communication of program information (Braille, large print, audiotape, etc.) should
contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a
complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400
Independence Avenue, S.W., Washington, D.C_ 20250-9410 or call (800) 795-3272
(voice) or (202) 720-8382 (TDD). USDA is an equal opportunity provider and
employer.
3
0
Contents
Preface................................................................. . ..................................................2
SoilMap..................................................................................................................5
SoilMap. ............................................................................................................... 6
Legend..................................................................................................................7
MapUnit Legend..................................................................................................8
MapUnit Descriptions..........................................................................................8
King County Area, Washington.......................................................................10
AmC—Arents, Alderwood material, 6 to 15 percent slopes ........................ 10
References........................................................... ........................... ......................11
4
0
Sail Map
LJ
The soil map section includes the soil map for the defined area of interest, a list of soil
map units on the map and extent of each reap unit, and cartographic symbols
displayed on the map. Also presented are various metadata about data used to
produce the map, and a description of each soil map unit.
5
ff,lW,f4FAIP441
0
Q
43
f.)
:3 Q
O f0
N
w
� O
O U)
0
E
O
U
M.JX AT oZZT
2
0080925 06L09ZS 0 MOWS OZZ0 N 09109N DSLd9ZS 04L09Z5 0CL09Z5 0aUJE 01[0925 WL092S
0
a-
a)
x
N
u
a
U)
(D
`0n
VJ
E
O
0 0
r-
C5
tm
v
`o as m
o
w
o
o
a
N
N N
y
` N U
m
c6
0
'C7
dl L
$
" N
Q7 O
U_
m
Gi
"10
r
C O
[Gy.
0
0 l6
R
16U
'O
0
V
y O C
N
U m O y
N
G7 a co E
'�
'C
U
N
�_ N
U
CL
OS O p}
7
G
3 m�
N
C
O
If1
d
—
O 0
Z
m
Eai
C U 0-
CL m�
�
O �LL7
@cM
m� Na
a0
U
cm
c4
E
�
c
�a O
a>�va
nen
F,
v+
E rn ja 2
�
N
�a
o w� a
Z
m N
A_- E 'n
o m
Q
3
a �E o
urE
a
c
Uyw
am o y a•
Or
¢
v
L
3�
p
m
m n W m
E
o
Om
n n L
t/J
ami n
o
m
@
c 4f
U�
c
m oE
¢
Q
OOA
N
m U m
m
13 -
Sm
LN
OO
�
CL C
E
E
43
O 0
0-
CD
a
�
0�
2 0
Vca
.En
a
2O
m
-0 a[G)u
E
aa
j�
OUO
a
N
L0
a
IT
u
E
� ay
m
a
m-
U'¢ c c
41
Y�
a
�
y m c
O O
ry
O [9 S
E
L
Z
a
O IL .U .@„
m N
Q1
m
N
.N
O 67 0
y
g
•G
a b
y.
.. d
L C
�y d�
m
a»
m
as m
E
o:5 a
-0
3�
G
._-• 0
�o
0
ul
W
cA
a>�, coi
?E
v) s
— m
E mac
N O
and
m
om
N�
N 3
O Uf
c
.gym•
i`c c°3 N
m m
S a o
a -W N V
407 7
N
E
_
m y
W n 07
t0
�
m
c .0 m 'p
Lu E Q 4r
N 4)
a E
O m b
( U
m 0 4) � m
n n o Q v
L 0)
F-
O
U) Cl)
O
U) `o
m p
❑ c�
L p
F-
o
n
N
N
m
a
ti
Aco
c
L)
N
r
n
m
N
d
=O
O J
y
d}
O O CLL
aC
A
o
y
N 'l.1
d L Q
m
N C
N
rm Cn
'(G 0 al
vs
in
7
A cn
; cn o
a
s
� r
0
3
Z
LL a
Ar
M
0
m
W
J
IL
Qo
Qm
c
0
as
o
a
o c o
N
a
a
n
Q
m
> >
a a u
(q m m m
a
:
o o d
�-
a o
—
3 m
O c
p R
W
m
C n
a o
n n
W
i
m 6
a
O in
Q
R
2 LL
3
� O
b
T N 7
LL
S v m 0
W U
C Y
G -0
d y
m O
d
Q
'Q 'Q .O 5
Ul U] UJ 'p
_2 �5
CO m
m O N
U U CJ
N m N m
0 J J
c '"
y O
CL Of
s m
LO U)
d c
N U)
O
U) UJ
r.
Sd
c
m
W
Q
y
r-
0 Custom Soil Resource Report*
Map Unit Legend
King County Area, Washington (WA633)
Map Unit Symbol
Map Unit Name
Acres in AOI
Percent of AOt
AmC
Arents, Alderwood material, 6 to
15 percent slopes
2.6
100.0%
Totals for Area of Interest
2.6
100.0%
Map Unit Descriptions
The map units delineated on the detailed soil maps in a soil survey represent the soils
or miscellaneous areas in the survey area. The map unit descriptions, along with the
maps, can be used to determine the composition and properties of a unit.
A map unit delineation on a soil map represents an area dominated by one or more
major kinds of soil or miscellaneous areas. A map unit is identified and named
according to the taxonomic classification of the dominant soils. Within a taxonomic
class there are precisely defined limits forthe properties of the soils. On the landscape,
however, the soils are natural phenomena, and they have the characteristic variability
of all natural phenomena. Thus, the range of some observed properties may extend
beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic
class rarely, if ever, can be mapped without including areas of other taxonomic
classes. Consequently, every map unit is made up of the soils or miscellaneous areas
for which it is named and some minor components that belong to taxonomic classes
other than those of the major soils.
Most minor soils have properties similar to those of the dominant soil or soils in the
map unit, and thus they do not affect use and management. These are called
noncontrasting, or similar, components. They may or may not be mentioned in a
particular map unit description. Other minor components, however, have properties
and behavioral characteristics divergent enough to affect use or to require different
management. These are called contrasting, or dissimilar, components. They generally
are in small areas and could not be mapped separately because of the scale used.
Some small areas of strongly contrasting soils or miscellaneous areas are identified
by a special symbol on the maps. If included in the database for a given area, the
contrasting minor components are identified in the map unit descriptions along with
some characteristics of each. A few areas of minor components may not have been
observed, and consequently they are not mentioned in the descriptions, especially
where the pattern was so complex that itwas impractical to make enough observations
to identify all the soils and miscellaneous areas on the landscape.
The presence of minor components in a map unit in no way diminishes the usefulness
or accuracy of the data. The objective of mapping is not to delineate pure taxonomic
classes but rather to separate the landscape into landforms or landform segments that
have similar use and management requirements. The delineation of such segments
on the map provides sufficient information for the development of resource plans. If
intensive use of small areas is planned, however, onsite investigation is needed to
define and locate the soils and miscellaneous areas.
I:l
Custom Soil Resource Report*
An identifying symbol precedes the map unit name in the map unit descriptions. Each
description includes general facts about the unit and gives important soil properties
and qualities.
Soils that have profiles that are almost alike make up a soil series. Except for
differences in texture of the surface layer, all the soils of a series have major horizons
that are similar in composition, thickness, and arrangement.
Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity,
degree of erosion, and other characteristics that affect their use. On the basis of such
differences, a soil series is divided into soil phases. Most of the areas shown on the
detailed soil maps are phases of soil series. The name of a soil phase commonly
indicates a feature that affects use or management. For example, Alpha silt loam, 0
to Z percent slopes, is a phase of the Alpha series.
Some map units are made up of two or more major soils or miscellaneous areas.
These map units are complexes, associations, or undifferentiated groups.
A complex consists of two or more soils or miscellaneous areas in such an intricate
pattern or in such small areas that they cannot be shown separately on the maps. The
pattern and proportion of the soils or miscellaneous areas are somewhat similar in all
areas. Alpha -Beta complex, 0 to 6 percent slopes, is an example.
An association is made up of two or more geographically associated soils or
miscellaneous areas that are shown as one unit on the maps. Because of present or
anticipated uses of the map units in the survey area, it was not considered practical
or necessary to map the soils or miscellaneous areas separately. The pattern and
relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha -
Beta association, 0 to 2 percent slopes, is an example.
An undifferentiated group is made up of two or more soils or miscellaneous areas that
could be mapped individually but are mapped as one unit because similar
interpretations can be made for use and management. The pattern and proportion of
the soils or miscellaneous areas in a mapped area are not uniform. An area can be
made up of only one of the major soils or miscellaneous areas, or it can be made up
of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example.
Some surveys include miscellaneous areas. Such areas have little or no soil material
and support little or no vegetation_ Rock outcrop is an example.
0 Custom Soil Resource Report*
King County Area, Washington
AmC---Arents, Alderwood material, S to 15 percent slopes
Map Unit Setting
National map unit symbol. 1 hmsq
Mean annual precipitation: 35 to 60 inches
Mean annual air temperature: 50 degrees F
Frost -free period: 150 to 200 days
Farmland classification: Not prime farmland
Map Unit Composition
Arents, alderwood material, and similar soils: 100 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Arents, Alderwood Material
Setting
Landform: Till plains
Parent material: Basal till
Typical profile
HI - 0 to 26 inches: gravelly sandy loam
H2 - 26 to 60 inches: very gravelly sandy loam
Properties and qualities
Slope: 6 to 15 percent
Depth to restrictive feature: 20 to 40 inches to densic material
Natural drainage class: Moderately well drained
Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately
low (0.00 to 0.06 in/hr)
Depth to water table: About 16 to 36 inches
Frequency of flooding: None
Frequency of ponding: None
Available water storage in profile: Very low (about 2.3 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 4s
Hydrologic Soil Group: BID
10
0 0
References
American Association of State Highway and Transportation Officials (AASHTO). 2004.
Standard specifications for transportation materials and methods of sampling and
testing. 24th edition.
American Society for Testing and Materials (ASTM)_ 2005. Standard classification of
soils for engineering purposes. ASTM Standard D2487-00.
Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of
wetlands and deep -water habitats of the United States. U.S. Fish and Wildlife Service
FWSIOBS-79131.
Federal Register. July 13, 1994. Changes in hydric soils of the United States.
Federal Register. September 18, 2002. Hydric soils of the United States.
Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils
in the United States.
National Research Council. 1995. Wetlands: Characteristics and boundaries.
Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S_
Department of Agriculture Handbook 18. http://www.nres.usda.govtwps/portal/nres/
detail/national/soils/?cid=nresl42p2_054262
Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making
and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service,
U.S_ Department of Agriculture Handbook 436. http:ltwww.nres.usda.gov/wps/portal/
nres/detail/national/soils/?cid=nresl42p2_053577
Soil Survey Staff. 2010. Keys to soil taxonomy. 11 th edition. U.S. Department of
Agriculture, Natural Resources Conservation Service. http://www.nres.usda.gov/wps/
portallnres/detail/nationallsoils/?cid=nresl42p2_053580
Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and
Delaware Department of Natural Resources and Environmental Control, Wetlands
Section_
United States Army Corps of Engineers, Environmental Laboratory_ 1987. Corps of
Engineers wetlands delineation manual. Waterways Experiment Station Technical
Report Y-87-1,
United States Department of Agriculture, Natural Resources Conservation Service.
National forestry manual. http://www.nres.usda.govtwps/portal/nres/detail/soils/
home/?cid=nresl 42p2_053374
United States Department of Agriculture, Natural Resources Conservation Service.
National range and pasture handbook. http://www.nres.usda.gov/wps/portal/nres/
detaillnational/landuselrangepasturel?cid=stelprdb1043084
11
0 Custom Soil Resource Report*
United States Department of Agriculture, Natural Resources Conservation Service.
National soil survey handbook, title 430 -VI. http://www.nres.usda.gov/wps/portal/
nres/deta il/soils/scientists/?cid=nres142p2_054242
United States Department of Agriculture, Natural Resources Conservation Service.
2006. Land resource regions and major land resource areas of the United States, the
Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296.
http:Uwww.nres.usda.gov/wps/portal/nres/detail/national/soils/?
cid=nres 142 p2_053624
United States Department of Agriculture, Soil Conservation Service. 1961. Land
capability classification. U.S. Department of Agriculture Handbook 210. http://
www.nres.usda.gov/Internet/FSE_DOCUMENTS/nresl42p2_052290_pdf
12
. GEOTECHNICAL ENGINEERING STUC
STINDE 13 LOT RESIDENTIAL PLAT
850 & 870
MONROE AVENUE NORTHEAST
RENTON, WASHINGTON
i
ES -4427
-,
"l .
IS (l5 =
k44
Earth
Geotechnical Engineering
Geology
Environmental Scientists
Construction Monitoring
. GEOTECHNICAL ENGINEERING STUC
STINDE 13 LOT RESIDENTIAL PLAT
850 & 870
MONROE AVENUE NORTHEAST
RENTON, WASHINGTON
i
ES -4427
-,
"l .
IS (l5 =
k44
PREPARED FOR
Harbour Homes, LLC
April 27, 2016
Brett J. Priebe, E.I.T.
Staff Engineer
Stephen H. Aril
Staff fieolgg1st
ly-11o'.
GEOTECHNICAL ENGINEERING STUDY
STINDE 13 LOT RESIDENTIAL PLAT
850 & 870 MONROE AVENUE NORTHEAST
RENTON, WASHINGTON
ES -4427
Earth Solutions NW, LLC
1805 —136th Place Northeast, Suite 201
Bellevue, Washington 98005
Phone: 425-449-4704 Fax: 426-449-4711
Toll Free: 866-336-8710
9 0
Geotechnical Engineering Report ,,
Geotechnical Services Are Performed for
Specific Purposes, Persons, and Projects
Geotechnical engineers structure their services to meet the specific needs of
their clients. A geotechnical engineering study conducted for a civil engi-
neer may not fulfill the needs of a construction contractor or even another
civil engineer Because each geotechnical engineering study is unique, each
geotechnical engineering report is unique, prepared solely for the client No
one except you should rely on your geotechnical engineering report without
first conferring with the geotechnical engineer who prepared it. And no one
— not even you —should apply the report for any purpose or project
except the one originally contemplated.
Read the Fofl Report
Serious problems have occurred because those relying on a geotechnical
engineering report did not read it all. Do not rely on an executive summary.
Do not read selected elements only.
A Geotechnical Engineering Report Is Based on
A Unique Set of Project -Specific Factors
Geotechnical engineers consider a number of unique, project -specific fac-
tors when establishing the scope of a study. Typical factors include: the
client's goals, objectives, and risk management preferences; the general
nature of the structure invoived, its size, and configuration; the location of
the structure on the site; and other planned or existing site improvements,
such as access roads, parking lots, and underground utilities. Unless the
geotechnical engineer who conducted the study specifically indicates oth-
erwise, do not rely on a geotechnical engineering report that was:
• not prepared for you,
• not prepared for your project,
• not prepared for the specific site explored, or
• completed before important project changes were made.
Typical changes that can erode the reliability of an existing geotechnical
engineering report include those that affect:
• the function of the proposed structure, as when it's changed from a
parking garage to an office building, or from a light industrial plant
to a refrigerated warehouse,
• elevation, configuration, location, orientation, or weight of the
proposed structure,
• composition of the design team, or
• project ownership.
As a general rule, always inform your geotechnical engineer of project
changes—even minor ones --and request an assessment of their impact.
Geotechnical engineers cannot accept responsibility or liability for problems
that occur because their reports do not consider developments of which
they were not informed
Subsurface Conditions Can Change
A geotechnical engineering report is based on conditions that existed at
the time the study was performed. Do not rely on a geotechnical engineer-
ing report whose adequacy may have been affected by: the passage of
time; by man-made events, such as construction on or adjacent to the site;
or by natural events, such as floods, earthquakes, or groundwater fluclua-
tions. Always contact the geotechnical engineer before applying the report
to determine if it is still reliable. A minor amount of additional testing or
analysis could prevent major probiems.
Most Geotechnical Findings Are Professional
Opinions
Site exploration identifies subsurface conditions only at those points where
subsurface tests are conducted or samples are taken. Geotechnical engi-
neers review field and laboratory data and then apply their processional
judgment to render an opinion about subsurface conditions throughout the
site. Actual subsurface conditions may differ—sometimes significantly ---
from those indicated in your report. Retaining the geotechnical engineer
who developed your report to provide construction observation is the
most effective method of managing the risks associated with unanticipated
conditions.
A Report's Recommendations Are Nat Final
Do not overrely an the construction recommendations included in your
report. Those recommendations are not final, because geotechnical engi-
neers develop them principally from judgment and opinion. Geotechnical
engineers can finalize their recommendations only by observing actual
subsurface conditions revealed during construction. The geotechnical
engineer who developed your report cannot assume responsibility or
liability for the report's recommendations if that engineer does not perform
construction observation.
A Geotechnical Engineering Report Is Subject to
Misinterpretation
Other design team members' misinterpretation of geotechnical engineering
reports has resulted in costly problems. Lower that risk by having your geo-
technical engineer confer with appropriate members of the design team after
submitting the report. Also retain your geotechnical engineer to review perti-
nent elements of the design team's plans and specifications. Contractors can
also misinterpret a geotechnical engineering report. Reduce that risk by
having your geotechnical engineer participate in prebid and preconstruction
conferences, and by providing construction observation.
Be Not Redraw the Engtineer's Logs
Geotechnical engineers prepare final boring and testing logs based upon
their interpretation of field logs and laboratory data. To prevent errors or
omissions, the logs included in a geotechnical engineering report should
never be redrawn for inclusion in architectural or other design drawings_
Only photographic or electronic reproduction is acceptable, but recognize
that separating logs from the report can elevate risk.
Give Contractors a Complete Report and
Guidance
Some owners and design professionals mistakenly believe they can make
contractors liable for unanticipated subsurface conditions by limiting what
they provide for bid preparation. To help prevent costly problems, give con-
tractors the complete geotechnical engineering report, butpreface it with a
clearly written letter of transmittal. In that letter, advise contractors that the
report was not prepared for purposes of bid development and that the
report's accuracy is limited; encourage them to confer with the geotechnical
engineer who prepared the report (a modest fee may be required) and/or to
conduct additional study to obtain the specific types of information they
need or prefer. A prebid conference can also be valuable. Be sure contrac-
tors have sufficient time to perform additional study. Only then might you
be in a position to give contractors the best information available to you,
while requiring them to at least share some of the financial responsibilities
stemming from unanticipated conditions.
Read Responsibility Provisions Closely
Some clients, design professionals, and contractors do not recognize that
geotechnical engineering is far less exact than other engineering disci-
plines. This lack of understanding has created unrealistic expectations that
have led to disappointments, claims, and disputes. To help reduce the risk
of such outcomes, geotechnical engineers commonly include a variety of
explanatory provisions in their reports. Sometimes labeled "limitations"
many of these provisions indicate where geotechnical engineers' responsi-
bilities begin and end, to help others recognize their own responsibilities
and risks. Read these provisions closely. Ask questions. Your geotechnical
engineer should respond fully and frankly.
Geoenviponmental Concerns Are Not Covered
The equipment, techniques, and personnel used to perform a geoenviron-
mental study differ significantly from those used to perform a geotechnical
study. For that reason, a geotechnical engineering report does not usually
relate any geoenvironmental findings, conclusions, or recommendations;
e.g., about the likelihood of encountering underground storage tanks or
regulated contaminants. Unanticipated environmental problems have led
to numerous project failures. If you have not yet obtained your awn geoen-
vironmental information, ask your geotechnical consultant far risk man-
agement guidance. Do not rely on an environmental report prepared for
someone else.
Obtain Professional Assistance To Deal with Mold
Diverse strategies can be applied during building design, construction,
operation, and maintenance to prevent significant amounts of mold from
growing on indoor surfaces. To be effective, all such strategies should be
devised for the express purpose of mold prevention, integrated into a com-
prehensive plan, and executed with diligent oversight by a professional
mold prevention consultant. Because just a small amount of water or
moisture can lead to the development of severe mold infestations, a num-
ber of mold prevention strategies focus on keeping building surfaces dry.
While groundwater, water infiltration, and similar issues may have been
addressed as part of the geotechnical engineering study whose findings
are conveyed in -this report, the geotechnica[ engineer in charge of this
project is not a mold prevention consultant; none of the services per-
formed in connection with the geotechnical engineer's study
were designed or conducted for the purpose of mold preven-
tion. Proper implementation of the recommendations conveyed
in this report will not of itself be sufficient to prevent mold from
growing in or on the structure involved.
Relyy. on Your ASFE-Member Geotechncial
EnSineer for Additional Assistance
Membership in ASFEfThe Best People on Earth exposes geotechnical
engineers to a wide array of risk management techniques that can be of
genuine benefit for everyone involved with a construction project. Confer
with you ASFE-member geotechnical engineer for more information.
ASFE
Ths last Paoli[@ as Earth
8811 Colesville Road/Suite G106, Silver Sgring, MD 20910
Telephone: 3011565-2733 Facsimile: 3011589-2017
e-mail: info@asfe,org www.askorg
Copyright 2004 by ASFE, 0c Duplication, reproduction, or copying of this document, in whole or in part by any means whatsoever, is strictly prohibited, except with ASFE's
specific written permission. Excerpting, quoting, or otherwise extracting wording from this document is permitted only with the express written permission of ASFE, and only for
purposes of scholarly research or book review. Only members of ASFE may use this document as a complement to or as an element of a geotechnical engineering report. Any other
firm, individual, or other entity that so uses this document without being an ASFE member could be committing negfigent or intentional (fraudulent) misrepresentation.
I1GER06G4EGV
CEJ
April 27, 2016
ES -4427
Harbour Homes, LLC
400 North 34" Street, Suite 300
Seattle, Washington 98103
Attention; Mr. Chris Burrus
Dear Mr. Burrus:
Earth
it Solutions
N W «C
_ r
Earth Solutions NW Lac
• Geotechnical Engineering
• Construction Monitoring
• Environmental Sciences
Earth Solutions NW, LLC (ESNW) is pleased to present this report titled "Geotechnical
Engineering Study, Stinde 13 Lot Residential Plat, 850 & 870 Monroe Avenue Northeast,
Renton, Washington". Based on the results of our investigation, the proposed residential
development is feasible from a geotechnical standpoint. our study indicates the site is
underlain primarily by Vashon glacial till with areas of Vashon recessional outwash deposits.
During our subsurface exploration completed on March 18, 2016, light to moderate perched
groundwater seepage was observed in four of the seven test pit locations at various depths
from one and one-half to five feet below existing grades. In our opinion, perched groundwater
seepage should be anticipated during construction.
In our opinion, the proposed residential structures may be constructed on conventional
continuous and spread footing foundations bearing upon competent native soil, recompacted
native soil, or new structural fill. In general, competent native soil suitable for support of
foundations will likely be encountered within the upper one to three and one-half feet of existing
grades. Where loose or unsuitable soil conditions are exposed at foundation subgrade
elevations, compaction of soils to the specifications of structural fill, or overexcavation and
replacement with a suitable structural fill material, will be necessary.
Construction of the proposed vault within the southwestern portion of the site is feasible from a
geotechnical standpoint. We anticipate competent, dense to very dense, undisturbed Vashon
till will be encountered within excavations at depth for the vault foundation subgrade elevation.
With respect to infiltration, it is our opinion native soils will not accommodate large-scale or full
infiltration facility design.
Recommendations for foundation design, site preparation, drainage, and other pertinent
development aspects are provided in this study. We appreciate the opportunity to be of service
to you on this project. If you have questions regarding the content of this geotechnical
engineering study, please call.
Sincerely,
EARTH SOLUTIONS NW, LLC
Brett J. Priebe, E.I.T.
Staff Engineer
1805 - 136th Place N.E,, Suite 201 0 Bellevue, WA 98005 1 (425) 449-4704 • FAX (425) 449-4711
0 0
Table of Contents
ES -4427
PAGE
INTRODUCTION.................................................................................
General.....................................................................................
Project Description................................................................
SITE CONDITIONS ...... ............................................................ I........... 2
Surface..................................................................................... 2
Subsurface.................................,............................................. 2
Topsoil and Fill............................................................. 2
NativeSoil..................................................................... 3
Geologic Setting........................................................... 3
Groundwater............................................................................ 3
CriticalAreas.......................................................................... 4
DISCUSSION AND RECOMMENDATIONS.................................I......
4
General....................................................................................
4
Site Preparation and Earthwork .............................................
4
Temporary Erosion Control .........................................
4
Stripping........................................................................
5
In-situ and Imported Soils ............................................
5
Subgrade Preparation .................................................
5
StructuralFill................................................................
6
Foundations.............................................................................
6
Utility Support and Trench Backfill ........................................
7
SeismicDesign ........................................................................
7
Slab -on -Grade Floors.............................................................
7
Retaining. Walls ........................................................................
8
Dra. inauee...................................................................................
9
Infiltration Feasibility....................................................
9
Preliminary Detention Vault Design ............................
9
Excavations and Slopes............. ............................................
10
Preliminary Pavement Sections .............................................
11
LIMITATIONS............................................................I........................ 12
Additional Services................................................................. 12
Earth Solutions NW, LLC
Table of Contents
Cont'd
ES -4427
GRAPHICS
Plate 1 Vicinity Map
Plate 2 Test Pit Location Plan
Plate 3 Retaining Wall Drainage Detail
Plate 4 Footing Drain Detail
APPENDICES
Appendix A Subsurface Exploration
Test Pit Logs
Appendix B Laboratory Test Results
Earth Solutions NW, LLC
0
GEOTECHNICAL ENGINEERING STUDY
STINDE 13 LOT RESIDENTIAL PLAT
850 & 870 MONROE AVENUE NORTHEAST
RENTON, WASHINGTON
ES -4427
INTRODUCTION
General
This geotechnical engineering study (study) was prepared for the proposed residential plat to
be constructed at 850 & 870 Monroe Avenue Northeast in Renton, Washington. The purpose
of this study was to provide geotechnical recommendations for the currently proposed
development plans. Our scope of services for completing this study included the following:
• Observation of test pits for purposes of characterizing site soils;
• Laboratory analysis of representative soil samples collected at the test pit locations;
• Conducting engineering analyses, and
• Preparation of this report.
The following documents and maps were reviewed as part of our study preparation:
Online Web Soil Survey (WSS) resource, maintained by the Natural Resources
Conservation Service under the United States Department of Agriculture;
• Liquefaction Susceptibility for King County (Map 11-5), incorporating data from the
Washington State Department of Natural Resources, dated May 2010, and;
• Geologic Map of King County, by Derek B. Booth, Kathy G. Troost, and Aaron P. Wisher,
March 2007.
• Sensitive Areas maps for the City of Renton.
Proiect Description
We understand the site will be redeveloped with a residential plat comprised of 13 single-family
lots, utility upgrades, and related infrastructure improvements. A stormwater detention tract will
be located in the southwest corner of the site. Two single-family residences and several
outbuildings currently occupy the subject site and will be removed in preparation for the
proposed redevelopment.
Earth Solutions NW, LLC
Harbour Homes, LLC
April 27, 2016
ES -4427
Page 2
At the time of this report production, specific grading and building load plans were not available
for review; however, based on our experience with similar developments, the proposed
residential structures will likely be on the order of two to three stories in height and constructed
using relatively lightly loaded wood framing supported on conventional foundations. Perimeter
footing loads will likely be on the order of 1 to 2 kips per lineal foot (klf). Slab -on -grade loading
is anticipated to be approximately 150 pounds per square foot (psf).
If the above design assumptions are incorrect or change, ESNW should be contacted to review
the recommendations in this report. ESNW should review final designs to confirm that our
geotechnical recommendations have been incorporated into the plans.
SITE CONDITIONS
Surface
The subject site is located approximately 115 feet south of the intersection between Monroe
Avenue Northeast and Northeast 91h Street, on the east side of Monroe Avenue Northeast, in
Renton, Washington. The subject site is comprised of two adjoining tax parcels (King County
Parcel Nos. 092305-9116 and -9117) totaling approximately 2.46 acres.
The site is bordered to the north, east, and south by single-family residential homes and
associated open space and to the west by Monroe Avenue Northeast. Two single-family
residences and several outbuildings currently occupy the subject site and will be removed in
accordance with project redevelopment plans. A tree retention area is located in the northwest
corner of the site. The site topography is relatively flat. Existing vegetation consists primarily of
grass with moderately dense tree cover and overgrown blackberry bushes to the east of the
existing residences.
Subsurface
An ESNW representative observed, logged, and sampled seven test pits, excavated at
accessible locations within the property boundaries, on March 18, 2016 using a client -provided
mini trackhoe and operator. The test pits were completed for purposes of assessment and
classification of site soils as well as characterization of groundwater conditions within areas
proposed for new development. The approximate locations of the test pits are depicted on
Plate 2 (Test Pit Location Plan). Please refer to the test pit logs provided in Appendix A for a
more detailed description of subsurface conditions. Selected soil samples collected at the test
pit locations were classified in accordance with both Unified Soil Classification System (USCS)
and United States Department of Agriculture (USDA) methods.
Topsoil and Fill
Topsoil was encountered generally within the upper 4 to 24 inches of existing grades at the test
pit locations. The topsoil was characterized by dark brown color, the presence of fine organic
material, and small root intrusions. Based on our field observations, we estimate topsoil will be
encountered with an average thickness of 12 inches across the site.
Earth Solutions NW, LLC
Harbour Homes, LLC ES -4427
April 27, 2016 Page 3
Fill was encountered at one test pit location (TP -3) to a depth of approximately two feet below
existing surface elevation. The fill was classified primarily as loose to medium dense, silty sand
with gravel (USCS: SM). Fill is likely present to some degree around existing structures and
road alignments. Fill soil may be used as structural fill material, but must be evaluated by
ESNW prior to use.
Native Soil
Underlying topsoil and fill, native soils were encountered primarily as medium dense to very
dense, silty sand with gravel (USCS: SM), with areas of poorly graded sand and well graded
sand with silt (USCS: SP -SM and SW -SM, respectively). Please refer to the attached test pit
logs for a more detailed description of subsurface conditions. The native soils encountered are
consistent with the typical composition of Vashon glacial till and Vashon recessional outwash
deposits. The upper, loose to medium dense deposits are characterized as "weathered", and
the deeper, dense deposits are characterized as "unweathered". The in-situ cementation within
the unweathered Vashon glacial till is characterized primarily as moderate. Native soils were
observed primarily in a moist condition, and extended to the maximum exploration depth of
eight and one-half feet below existing grades.
Geologic Setting
The referenced geologic map resource identifies Vashon till (Qvt) across the site with Vashon
recessional outwash (Qvr) mapped to the west of the subject site. As reported on the geologic
map resource, Vashon till typically consists of a nonsorted mixture of variable amounts of clay,
silt, sand, pebbles, cobbles, and boulders, and is commonly referred to as "hardpan". The
glacial till was deposited directly from the ice as it advanced over bedrock and older Quaternary
sediment. Vashon recessional outwash consists of well -drained, stratified outwash sand and
gravel, with some silt and clay. In addition, the referenced WSS resource identifies arents of
Alderwood material (Map Unit: AmC) across the site and surrounding areas. Alderwood series
soils were formed in terraces and glacial till plains. Arents refers to soils that lack distinct,
diagnostic horizons, primarily due to mixing or moving by humans. Based on our field
observations, native soils on the subject site are consistent primarily with the Vashon till and
Vashon recessional outwash geologic setting outlined in this section.
Groundwater
During our subsurface exploration completed on March 18, 2016, light to moderate groundwater
seepage was encountered in four of the seven tests at approximately one and one-half to five
feet below existing grades. Our interpretation of the observed groundwater seepage is that of a
perched condition atop the relatively impermeable Vashon glacial till. Groundwater seepage is
common within Vashon glacial till, and is typically observed at the contact with the dense to
very dense, unweathered deposits. Seepage rates and elevations fluctuate depending on
many factors, including precipitation duration and intensity, the time of year, and soil conditions.
In general, groundwater seepage flow rates are higher during the wetter, winter months.
Therefore, groundwater seepage should be expected in site excavations, particularly in the
winter and spring months.
Earth Solutions NW, LLC
Harbour Homes, LLC
April 27, 2016
Critical Areas
ES -4427
Page 4
After review of the referenced sensitive areas maps published by the City of Renton, a portion
of the subject site is mapped as a moderate landslide hazard area. Based on our review of the
site topography, the lack of steep slopes, and the conditions observed while on site, in our
opinion the potential for a landslide should be characterized as very low.
DISCUSSION AND RECOMMENDATIONS
General
Based on the results of our investigation, construction of the proposed residential development
is feasible from a geotechnical standpoint. The primary geotechnical considerations associated
with the proposed development include foundation support, slab -on -grade subgrade support,
the suitability of using on-site soils as structural fill, and construction of the vault (where
applicable).
In our opinion, the proposed residential structures may be constructed on conventional
continuous and spread footing foundations bearing upon competent native soil, recompacted
native soil, or new structural fill. In general, competent native soil suitable for support of
foundations will likely be encountered within the upper one to three and one-half feet of existing
grades. Where loose or unsuitable soil conditions are exposed at foundation subgrade
elevations, compaction of soils to the specifications of structural fill, or overexcavation and
replacement with a suitable structural fill material, will be necessary.
This study has been prepared for the exclusive use of Harbour Homes, LLC and their
representatives. No warranty, expressed or implied, is made. This study has been prepared in
a manner consistent with the level of care and skill ordinarily exercised by other members of the
profession currently practicing under similar conditions in this area.
Site Preparation and Earthwork
Initial site preparation activities will consist of installing temporary erosion control measures,
establishing grading limits, performing clearing and site stripping (as necessary), and removing
existing structural elements. Subsequent earthwork activities will involve mass site grading and
related infrastructure improvements.
Temporary Erosion Control
Temporary construction entrances and drive lanes, consisting of at least 12 inches of quarry
spalls, should be considered in order to minimize off-site soil tracking and to provide a stable
access entrance surface. Geotextile fabric may also be considered underlying the quarry spalls
for greater stability of the temporary construction entrance. Erosion control measures should
consist of silt fencing placed around down -gradient margins of the site. Soil stockpiles should
be covered or otherwise protected to reduce soil erosion. Temporary approaches for controlling
surface water runoff should be established prior to beginning earthwork activities. Additional
Best Management Practices (BMPs), as specified by the project civil engineer and indicated on
the plans, should be incorporated into construction activities.
Earth Solutions NW, LLC
Harbour Homes, LLC 49
April 27, 2416
Stripping
ES -4427
Page 5
Topsoil was encountered generally within the upper 4 to 24 inches of existing grades at the test
pit locations. We estimate topsoil will be encountered with an average thickness of 12 inches:
however, ESNW should be retained to observe site stripping activities at the time of
construction so as to thoroughly assess the degree of required stripping. Over -stripping should
be avoided as it is unnecessary and may result in increased project development costs.
Topsoil and organic -rich soil is neither suitable for foundation support nor for use as structural
fill. Topsoil and organic -rich soil may be used in non-structural areas if desired.
In-situ and Imported Soils
The moisture sensitivity of the on-site soils is characterized as moderate to high. Successful
use of native soils as structural fill will largely be dictated by in-situ moisture contents at the time
of placement and compaction.
In general, soil that is at (or slightly above) the optimum moisture content at the time of
placement and compaction may be used as structural fill. Conversely, soil that is found to be
dry at the time of installation will likely require moisture conditioning (typically achieved through
the application of water) prior to soil compaction. Soil encountered during site excavations that
is excessively over the optimum moisture content will likewise require moisture conditioning
(typically achieved through soil aeration) prior to placement and compaction. It should be
emphasized native material should never be placed and compacted dry of the optimum
moisture content, especially in site utility trench applications. If the on-site soils cannot be
successfully compacted, the use of an imported soil may be necessary.
Imported soil intended for use as structural fill should consist of a well -graded granular soil with
a moisture content that is at or slightly above the optimum level. During wet weather
conditions, imported soil intended for use as structural fill should consist of a well -graded
granular soil with a fines content of 5 percent or less (where the fines content is defined as the
percent passing the Number 200 sieve, based on the minus three -quarter -inch fraction).
Subgrade Preparation
Following site stripping and removal of existing structures, cuts and fills will be completed to
establish proposed subgrade elevations across the site. ESNW should observe the subgrades
during initial site preparation activities to confirm soil conditions are as anticipated and to
provide supplementary recommendations for subgrade preparation, as necessary. The process
of removing existing structures may produce voids where old foundations and/or crawl space
areas may have been present. Complete restoration of voids as a result of demolition activities
must be executed as part of overall subgrade and building pad preparation activities. The
following guidelines for preparing building subgrade areas should be incorporated into the final
design:
Earth Solutions NW, LLC
Harbour Homes, LLC
April 27, 2016
ES -4427
Page 6
Where voids and related demolition disturbances extend below planned subgrade
elevations, restoration of these areas should be completed. Structural fill should be used
to restore voids or unstable areas resulting from the removal of existing structural
elements.
• Compact in place, or overexcavate and replace, areas of existing fill, if present, exposed
at building subgrade elevations. Overexcavations should extend into competent native
soils and structural fill should be utilized to restore subgrade elevations as necessary.
• ESNW should confirm subgrade conditions, as well as the required level of recompaction
and/or overexcavation and replacement, during site preparation activities. ESNW should
also evaluate the overall suitability of prepared subgrade areas following site preparation
activities.
Structural Fill
Structural fill is defined as compacted soil placed in foundation, slab -on -grade, and roadway
areas. Fill placed to construct permanent slopes and throughout retaining wall and utility trench
backfill areas is also considered structural fill. Soils placed in structural areas should be placed
in loose lifts of 12 inches or less and compacted to a relative compaction of 90 percent, based
on the laboratory maximum dry density as determined by the Modified Proctor Method (ASTM
D1557). Soil placed in the upper 12 inches of slab -on -grade, utility trench, and pavement areas
should be compacted to a relative compaction of at least 95 percent. Additionally, more
stringent compaction specifications may be required for utility trench backfill zones depending
on the responsible utility district or jurisdiction.
Foundations
In our opinion, the proposed residential structures may be constructed on conventional
continuous and spread footing foundations bearing upon competent native soil, recompacted
native soil, or new structural fill. In general, competent native soil suitable for support of
foundations will likely be encountered within the upper one to three and one-half feet of existing
grades. Where loose or unsuitable soil conditions are exposed at foundation subgrade
elevations, compaction of soils to the specifications of structural fill, or overexcavation and
replacement with a suitable structural fill material, will be necessary.
Provided the foundations will be supported as described above, the following parameters may
be used for design.
Allowable soil bearing capacity 2,500 psf
Passive earth pressure 300 pcf (equivalent fluid)
• Coefficient of friction 0.40
Earth Solutions NW, LLC
Harbour Homes, LLC ES -4427
April 27, 2016 Page 7
A one-third increase in the allowable soil bearing capacity may be assumed for short-term wind
and seismic loading conditions. The above passive pressure and friction values include a
factor -of -safety of at least 1.5. With structural loading as expected, total settlement in the range
of one inch and differential settlement of about one-half inch is anticipated. The majority of the
settlements should occur during construction as dead loads are applied.
Utility Support and Trench Backfill
In our opinion, on-site soils will generally be suitable for support of utilities. Remedial measures
may be necessary in some areas in order to provide support for utilities, such as
overexcavation and replacement with structural fill, or placement of geotextile fabric.
Groundwater seepage may be encountered within utility excavations and caving of trench walls
may occur where groundwater is encountered. Depending on the time of year and conditions
encountered, dewatering, as well as temporary trench shoring, may be necessary during utility
excavation and installation.
In general, on-site soils will likely be suitable for use as structural backfill throughout utility
trench excavations, provided the soil is at (or slightly above) the optimum moisture content at
the time of placement and compaction. Moisture conditioning of the soils may be necessary at
some locations prior to use as structural fill. Each section of the utility lines must be adequately
supported in the bedding material. Utility trench backfill should be placed and compacted to the
specifications of structural fill as previously detailed in this report, or to the applicable
specifications of the City of Renton or other responsible jurisdiction or agency.
Seismic Design
The 2012 International Building Code recognizes the American Society of Civil Engineers
(ASCE) for seismic site class definitions. In accordance with Table 20.3-1 of the ASCE
Minimum Design Loads for Buildings and Other Structures manual, Site Class D should be
used for design.
The referenced liquefaction susceptibility map indicates the native soils on site maintain very
low liquefaction susceptibility. Liquefaction is a phenomenon where saturated or loose soils
suddenly lose internal strength and behave as a fluid. This behavior is in response to
increased pore water pressures resulting from an earthquake or other intense ground shaking.
In our opinion, site susceptibility to liquefaction is low. The relative density of the native soils
and the absence of a uniformly established, shallow groundwater table were the primary bases
for this interpretation.
Slab -on -Grade Floors
Slab -on -grade floors for the proposed residential structures should be supported on a well -
compacted, firm and unyielding subgrade. Where feasible, native soils exposed at the slab -on -
grade subgrade level can likely be compacted in situ to the specifications of structural fill.
Unstable or yielding areas of the subgrade should be recompacted, or overexcavated and
replaced with suitable structural fill, prior to construction of the slab.
Earth Solutions NW, LLC
Harbour Homes, LLC
April 27, 2016
ES -4427
Page 8
A capillary break consisting of a minimum of four inches of free -draining crushed rock or gravel
should be placed below the slab. The free -draining material should have a fines content of 5
percent or less (where the fines content is defined as the percent passing the Number 200
sieve, based on the minus three -quarter -inch fraction). In areas where slab moisture is
undesirable, installation of a vapor barrier below the slab should be considered. If a vapor
barrier is to be utilized, it should be a material specifically designed for use as a vapor barrier
and should be installed in accordance with the specifications of the manufacturer.
Retalnina Walls
Retaining walls must be designed to resist earth pressures and applicable surcharge loads.
The following parameters may be used for design:
Active earth pressure (yielding condition)
e At -rest earth pressure (restrained condition)
Traffic surcharge (passenger vehicles)
• Passive earth pressure
Coefficient of friction
Seismic surcharge
• Where applicable
35 pcf (equivalent fluid)
50 pcf
70 psf (rectangular distribution)*
300 pcf (equivalent fluid)
0.40
6H*
The above design parameters are based on a level backfill condition and level grade at the wall
toe. Revised design values will be necessary if sloping grades are to be used above or below
retaining walls. Additional surcharge loading from adjacent foundations, sloped backfill, or
other relevant loads should be included in the retaining wall design.
Retaining walls should be backfilled with free -draining material that extends along the height of
the wall and a distance of at least 18 inches behind the wall. The upper 12 inches of the wall
backfill may consist of a fess permeable soil, if desired. A perforated drain pipe should be
placed along the base of the wall and connected to an approved discharge location. A typical
retaining wall drainage detail is provided on Plate 3. if drainage is not provided, hydrostatic
pressures should be included in the wall design.
Earth Solutions NW, LLC
Harbour Homes, LLC
April 27, 2016
Drainage
' ES -4427
Page 9
Based on our field observations, discrete zones of perched groundwater seepage should be
anticipated within site excavations, especially within those excavations for utilities. Perched
groundwater seepage should also be expected within shallower site excavations depending on
the time of year grading operations take place. Temporary measures to control surface water
runoff and groundwater seepage during construction would likely involve interceptor trenches
and sumps. ESNW should be consulted during preliminary grading to identify areas of seepage
and provide recommendations to reduce the potential for instability related to seepage effects.
Permanent interceptor drains may be necessary in some areas.
Finish grades must be designed to direct surface drain water away from structures and slopes.
Water must not be allowed to pond adjacent to structures or slopes. In our opinion, foundation
drains should be installed along building perimeter footings. A typical foundation drain detail is
provided on Plate 4.
Infiltration Feasibility
As indicated in the Subsurface section of this report, native soils encountered during our
fieldwork were characterized primarily as Vashon till. Subsequent to USDA textural analyses,
the Vashon glacial till was further classified as gravelly loamy sand. From a geotechnical
standpoint, the Vashon glacial till should not be considered an ideal geologic feature to
accommodate infiltration, especially when encountered in a dense, compact state. In general,
the infiltration capacity of the Vashon glacial till should be considered extremely minimal.
ESNW can provide further evaluation of, and recommendations for, stormwater flow control
BMPs upon request.
Preliminary Detention Vault Design
We anticipate stormwater will be managed likely by a below -grade detention vault which is
proposed for construction within the southwestern portion of the site. Specific grading plans for
the vault were not available for review at the time of report preparation; however, we anticipate
grade cuts on the order of 10 to 15 feet will be necessary to achieve the vault foundation
subgrade elevation. Based on our field observations, grade cuts for the vault are likely to
expose very dense, undisturbed Vashon glacial till.
The vault foundation should be supported on competent native soil or crushed rock placed atop
competent native soil. The final vault design must incorporate adequate buffer space from
property boundaries such that temporary excavations to construct the vault structure may be
successfully completed. Perimeter drains should be installed around the vault and conveyed to
an approved discharge point. Perched groundwater seepage should be anticipated within
excavations for the vault.
Earth Solutions Nw, LLC
Harbour Homes, LLC
April 27, 2016
The following preliminary design parameters may be used for the vault:
« Allowable soil bearing capacity (dense Vashon till)
Active earth pressure (unrestrained)
+ Active earth pressure (unrestrained, hydrostatic)
At -rest earth pressure (restrained)
At -rest earth pressure (restrained, hydrostatic)
• Coefficient of friction
• Passive earth pressure
5,000 psf
35 pcf
80 pcf
50 pcf
95 pcf
0.40
300 pcf
ES -4427
Page 10
Retaining walls should be backfilled with free -draining material or suitable sheet drainage that
extends along the height of the walls. The upper one foot of the wall backfill may consist of a
less permeable soil, if desired. A perforated drain pipe should be placed along the base of the
wall and connected to an approved discharge location. If the elevation of the vault bottom is
such that gravity flow to an outlet is not possible, the portion of the vault below the drain should
be designed to include hydrostatic pressure.
ESNW should observe grading operations for the vault and subgrade conditions prior to
concrete forming and pouring. If the soil conditions encountered during construction differ from
those anticipated, supplementary recommendations may be provided. ESNW should be
contacted to review final vault designs to confirm appropriate geotechnical parameters have
been incorporated, as necessary.
Excavations and Slopes
The Federal Occupation Safety and Health Administration (OSHA) and the Washington
Industrial Safety and Health Act (WISHA) provide soil classification in terms of temporary slope
inclinations. Soils that exhibit higher strength parameters are allowed steeper temporary slope
inclinations than are soils that exhibit lower strength parameters.
Based on the soil conditions encountered at the test pit locations, weathered Vashon till, areas
of fill, and any area where groundwater seepage are exposed are classified as Type C by
OSHA and WISHA. Temporary slopes over four feet in height in Type C soils must be sloped
no steeper than one -and -one half horizontal to one vertical (1.51HAV). Very dense, cemented,
undisturbed Vashon till encountered without the presence of groundwater may be classified as
Type A by OSHA and WISHA. Temporary slopes over four feet in height in Type A soils must
be sloped no steeper than 0.75H:1V. Type A soils that are fissured, subjected to vibrations
from heavy traffic, or have been otherwise previously disturbed must be classified as Type B by
OSHA and WISHA. Temporary slopes over four feet in height in Type B soils must be sloped
no steeper than 1 HAV.
Earth Sdutions NW, LLC
Harbour Homes, LLC
April 27, 2016
40 ES -4427
Page 11
Where encountered, the presence of perched groundwater may cause caving of temporary
slopes due to hydrostatic pressure. ESNW should observe site excavations to confirm soil
types and allowable slope inclinations. If the recommended temporary slope inclinations cannot
be achieved, temporary shoring may be necessary to support excavations.
Permanent slopes should be planted with vegetation to enhance stability and to minimize
erosion and should maintain a gradient of 2H:1 V or flatter. An ESNW representative should
observe temporary and permanent slopes to confirm the slope inclinations are suitable for the
exposed soil conditions. Supplementary recommendations with respect to excavations and
slopes may be provided as conditions warrant.
Preliminary Pavement Sections
The performance of site pavements is largely related to the condition of the underlying
subgrade. To ensure adequate pavement performance, the subgrade should be in a firm and
unyielding condition when subjected to proofrolling with a loaded dump truck. Structural fill in
pavement areas should be compacted to the specifications previously detailed in this report. It
is possible that soft, wet, or otherwise unsuitable subgrade areas may still exist after base
grading activities. Areas containing unsuitable or yielding subgrade conditions will require
remedial measures, such as overexcavation and replacement with crushed rock or structural fill,
prior to pavement.
We anticipate new pavement sections will be subjected primarily to passenger vehicle traffic.
For lightly loaded pavement areas subjected primarily to passenger vehicles, the following
preliminary pavement sections may be considered:
• A minimum of two inches of hot mix asphalt (HMA) placed over four inches of crushed
rock base (CRB), or;
• A minimum of two inches of HMA placed over three inches of asphalt treated base
(ATB).
Final pavement design parameters, including recommendations for heavy traffic areas or main
access roads, may be provided once final traffic loading has been determined. The HMA, ATB
and CRIB materials should conform to WSDQT specifications. All soil base material should be
compacted to a relative compaction of 95 percent, based on the laboratory maximum dry
density as determined by ASTM D1557. Pavement subgrade areas must be firm and
unyielding prior to placement of CRB or ATB. Road standards utilized by the City of Renton
may supersede the recommendations provided in this report.
Earth Solutions NW, LLC
Harbour Homes, LLC i ES -4427
April 27, 2016 Page 12
LIMITATIONS
The recommendations and conclusions provided in this study are professional opinions
consistent with the level of care and skill that is typical of other members in the profession
currently practicing under similar conditions in this area. A warranty is not expressed or
implied. Variations in the soil and groundwater conditions observed at the test pit locations may
exist and may not become evident until construction. ESNW should reevaluate the conclusions
in this study if variations are encountered.
Additional Services
ESNW should have an opportunity to review final project plans with respect to the geotechnical
recommendations provided in this report. ESNW should also be retained to provide testing and
consultation services during construction.
Earth Solutions NW, LLC
• [rstpr ds
-- - �'ti�'-tw � 3'y� � � • LNUfA
ai�nl myiFi:rn€>�'-�, ';� G r �
�.�,�, � ,, :.� i ��,4• :_ ' �. ,,....��7Ey -.�"� �,_T
5r 'tCv` ' LAhY �� � •{t SC IESi v1."v -'ti � 'r `�•��' �:
9f S:.tlA�x -,
P � 3-iYk ii� K
ACi S
3M.l•WH:� !
S MCv€DRFMM
M our,
�FlF� C'o 41,„t p� t�q y'6•
1. iQ„iff�x.�J Ft F$ ' • ^.!� ►[419.-C'R_t.I ..
.� a T ; s i�rH
'fin"its''r_ ��
Ayr
a --
80iF' !i-.715' ,rr' il�kAtiGS hy" rF�9
,.
� ,� ,. T.r � _ . _ M,.nrr:rrc�cxsi[r Vis. ••�
_ fKi �r
5?--R
�+ fr -
�Rr.Y y_r� LJ _ - ]T-•_€ ►+LL4 -
Ffx
rY
x.
i
!! tkl-� eS C ti16tF5 ' wf
Pit ND 'W
��1� a.-.; AFL IV FI}I CT �s9 � � �..,,� !i �' {Tw, � Y+]ar ►r �.. � tsi77�d
QE'eN Y -moi.. } 4�0 k er s a`�h3 rT
t -SzSr�[ r '� F�1Pf�'"" --- �I x� •r� � µ.�r,'� G ! i
M
$r� a
�It
# w.lx,k• °' ''r x ray"°" ■ !y h xav r -
INA Pep
Au ANT
14 )ittl IXik 9
c f a w �a+rrw H,
i
We K -
'7T yEf` is -�T+ •� r �.:
yy �' M 3 [' rIII9
11VY3
alu fi►�` i r ztrr a PA""
sir f� �1q R!dr�i =
�r�i� t �� 'SYt`s u.'rinl
A;ti� r x R "i� 7 _1[1Fat iR
�
''xi• .2''( 4 � ' 13 i a
1110
�t f � . ....... �.. rry � -.
t
W.
{� I .`}�+ Irt _'.c.. f+�71{�fr'3-� r c :r yI IIFilq i I, t .r
3 11 Kill
[[� .�c�!�.. a .,. 1 �... y
rl
.k.lCH sr �. � of gi .�
I L MJ .I F g #R F yi4 %Oby I .Y
e x f 8. q[1 sw ki �. r : s.r I ,qll l�. ❑ r 7 �1"Ir
a gin - I_.. :x K PIL �'..
��.,F, iJL�.. #._ Vit• j; ai
r s
I
id 444hL+tf 1a- l .. - i ? I]il• :7
'i....S.r
Reference: NORTH >r
� d� t
King County, Washington 9
Map 626 -z
By The Thomas Guide
Rand McNally
32nd Edition Vicinity Map
Stinde 13 Lot Residential Plat
Renton, Washington
NOTE: This plate may contain areas of color. ESNW cannot be Drwn. MRS Date 04/11/2016 Praj. No. 4427
responsible for any subsequent misinterpretation of the information
resulting from black & white reproductions of this plate. Checked BJP Date April 2016 Plate 1
LEGEND
TP -1 I Approximate Location of
— ■ — ESNW Test Pit, Proj. No.
ES -4427, Mar. 2016
I Subject Site
I I
Proposed Lot
Number
NOTE: The graphics shown on this plate are not intended for design
purposes or precise scale measurements, but only to illustrate the
approximate test locations relative to the approximate locations of
existing and ! or proposed site features, The information illustrated
is largely based on data provided by the client at the time of our
study. ESNW cannot be responsible for subsequent design changes
or interpretation of the data by others.
NOTE: This plate may contain areas of color. ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black & white reproductions of this plate.
NOT - TO - SCALE
A
Test Pit Location Plan
Stinde 13 Lot Residential Plat
Renton, Washington
Drwn. MRS
I
NT. W' 11 1
4427
Checked BJP
I
I
I I I I
I i I I
! f I
I I I ,
i I
I ! I I
I I I II
II A
5 I
TP -5
1
TP -2...
TP-6�
r
— f
■
i
12
I I TP -1,'
'' TP -3
w_ _
li
�■—
1
I
7
I Storm Drainage
— .
.L _ ........... ... - _.. .
_.................... _._
�
I
LEGEND
TP -1 I Approximate Location of
— ■ — ESNW Test Pit, Proj. No.
ES -4427, Mar. 2016
I Subject Site
I I
Proposed Lot
Number
NOTE: The graphics shown on this plate are not intended for design
purposes or precise scale measurements, but only to illustrate the
approximate test locations relative to the approximate locations of
existing and ! or proposed site features, The information illustrated
is largely based on data provided by the client at the time of our
study. ESNW cannot be responsible for subsequent design changes
or interpretation of the data by others.
NOTE: This plate may contain areas of color. ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black & white reproductions of this plate.
NOT - TO - SCALE
A
Test Pit Location Plan
Stinde 13 Lot Residential Plat
Renton, Washington
Drwn. MRS
Date 04/11/2016
Proj. No.
4427
Checked BJP
Date April 2016
Plate
2
18" Min.
p o 0 0 0 0 0 00 0
oa ° O c o
°pap d o� 0 o° o0 00().0.
p 0 O O oa 000 °d oDo/�yyop o
O /� ° ° 0
q0 V o
O O O OG 0 0 0
00 D °
o n ° o Q o
N o c p o oao O
0° o ° °o 0 00 0o 0 0
00 00 0 p O ,.,0 0
0 0 0° do° �bj a 0
00 ap o °o O Oo o
o 0 o (} o
O o OO ° O 4 0 0
0 0 0 �q
O O 0° 0 00
V
o0 4a 0 o
p
°o O o0 0 0
° °0000 00 00 0 0 8 °
°
o
°0 % 0 O
0 o p o p o 0 0 0
o D
0°op oo °
00 0 0 0 00 (} 0 0 °
pOp o0 0° poo 69e
p B o o Do°°
O O o 0 p
1 ir,
NOTES:
• Free Draining Backfill should consist
of soil having less than 5 percent fines.
Percent passing #4 should be 25 to
75 percent.
• Sheet Drain may be feasible in lieu
of Free Draining Backfill, per ESNW
recommendations.
• Drain Pipe should consist of perforated,
rigid PVC Pipe surrounded with 1"
Drain Rock.
LEGEND:
Structural
Fill
Perforated Drain Pipe
(Surround In Drain Rock)
SCHEMATIC ONLY - NOT TO SCALE
NOT A CONSTRUCTION DRAWING
aoo p Free Draining Structural Backfills
ti•ti•ti•ti
'.{:ti:ti:ti 1 inch Drain Rock RETAINING WALL DRAINAGE DETAIL
.r.r.r.r.
Stinde 13 Lot Residential Plat
Renton, Washington
Drwn.
MRS
Date 04/11/2016
Proj. No.
4427
Checked
BJP
Date April 2016
Plate
3
Perforated Rigid Drain Pipe
(Surround with 1" Rock)
NOTES:
• Do NOT tie roof downspouts
to Footing Drain.
• Surface Seal to consist of
12" of less permeable, suitable
soil. Slope away from building.
LEGEND:
Surface Seal; native sail or
other low permeability material.
4•S.1•S•
1° Drain Rock
SCHEMATIC ONLY - NOT TO SCALE
NOT A CONSTRUCTION DRAWING
FOOTING DRAIN DETAIL
Stinde 13 Lot Residential Plat
Renton, Washington
Drwn. MRS
Date 04/11/2016
Proj. No.
4427
Checked BJP
Date April 2016
Plate
4
E
Appendix A
Subsurface Exploration
Test Pit Logs
ES -4427
Subsurface conditions at the subject site were explored on March 18, 2016 by excavating a
total of seven test pits using a client -provided mini trackhoe and operator. The approximate
locations of the subsurface exploration test pits are illustrated on Plate 2 of this study. The
subsurface test pit logs are provided in this Appendix. The test pits were advanced to a
maximum depth of eight and one-half feet below existing grades.
The final logs represent the interpretations of the field logs and the results of laboratory
analyses. The stratification lines on the logs represent the approximate boundaries between
soil types. In actuality, the transitions may be more gradual.
Earth Solutions NW, LLC
0 Earth Solutions P#NLLC
SOIL CLASSIFICATION CHART
MAJOR DIVISIONS
SYMBOLS
TYPICAL
DESCRIPTIONS
GRAPH
LE"T"TER
GRAVEL
AND
CLEAN'.
GRAVELS
•
a
Gw
WELL -GRADED GRAVELS, GRAVEL -
SAND MIXTURES, LITTLE OR NO
FINES
;a°
0 Oo D
GP
POORLY -GRADED GRAVELS,
GRAVEL - SAND MIXTURES, LITTLE
OR NO FINES
GRAVELLY
SOILS
(LITTLE OR NO FINES)
COARSE
GRAINED
SOILS
MORE THAN 50%
OF COARSE
GRAVELS WITH
FINES
°
°� �°
a ° o
GM
SILTY GRAVELS, GRAVEL -SAND -
SILT MIXTURES
FRACTION
RETAINED ON NO.
4 SIEVE
(APPRECIABLEGC
AMOUNT OF FINES)
CLAYEY GRAVELS, GRAVEL - SAND -
CLAY MIXTURES
SAND
AND
CLEAN SANDS
Cv`
WELL -GRADED SANDS GRAVELLY
SANDS, LITTLE OR NO FINES
MORE THAN 50%
OF MATERIAL IS
SP
SANDS,
GRAVELLY SAND, LITTLE OR NO
FINES
LARGERTHAN
NO. 200 SIEVE
SIZE
SANDY
SOILSPOORLY-GRADED
(LITTLE OR NO FINES)
MORE THAN 50°6
OF COARSE
SANDS WITH
FINES
SM
SILT SANDS, SAND - SILT
FRACTION
+7L•
sc
CLAYEY SANDS, SAND - CLAY
MIXTURES
PASSING ON NO.
4 SIEVE
(APPRECIABLE
AMOUNT OF FINES)
INORGANIC SILTS AND VERY FINE
ML
SANDS, ROCK FLOUR, SILTY OR
CLAYEY FINE SANDS OR CLAYEY
SILTS WITH SLIGHT PLASTICITY
FINE
GRAINED
SOILS
SILTS
AND LIQUID LIMIT
CLAYS LESS THAN 50
CL
INORGANIC CLAYS OF LOW TO
MEDIUM PLASTICITY, GRAVELLY
CLAYS, LEAN CLLACLAYS, SILTY
OL
ORGANIC SILTS AND ORGANIC
SILTY CLAYS OF LOW PLASTICITY
MORE THAN 50%
OF MATERIAL IS
MH
INORGANIC SILTS, MICACEOUS OR
DIATOMACEOUS FINE SAND OR
SMALLER THAN
SILTY SOILS
NO. 200 $1 EVE
SIZE
SILTS
LIQUID LIMIT
AND
LAYS GREATER THAN 50
CH
INORGANIC CLAYS OF HIGH
PLASTICITY
OH
ORGANIC CLAYS OF MEDIUM TO
HIGH PLASTICITY, ORGANIC SILTS
HIGHLY ORGANIC SOILS-
_tLl ... 1 11
"-'
y y
PT
PEAT, HUMUS, SWAMP SOILS WITH
HIGH ORGANIC CONTENTS
DUAL SYMBOLS are used to indicate borderline soil classifications.
The discussion in the text of this report is necessary for a proper understanding of the nature
of the material presented in the attached logs.
Earth Solutiomfivv 40 TEST PIT NUMBER TP -1
1805 - 136thW N.E., Suite 201
MWBellevue, Washington 98005 PAGE 1 OF 1
Telephone: 425-449-4704
Fax: 425-449-4711
CLIENT Harbour Homes, LLC _ _ PROJECT NAME Stinde 13 Lot Residential Plat
PROJECT NUMBER 4427 PROJECT LOCATION Renton, Washington
DATE STARTED 3/16116 COMPLETED 3118116 GROUND ELEVATION TEST PIT SIZE
EXCAVATION CONTRACTOR Client Provided GROUND WATER LEVELS:
EXCAVATION METHOD AT 11ME OF EXCAVATION --
LOGGED BY BJP CHECKED BY BJP AT END OF EXCAVATION —
NOTES Depth of Topsoil 8 Sod 18"- 20": grass AFTER EXCAVATION —
w
IL
r1=
LU
o
-I �
TESTS
°- O
MATERIAL DESCRIPTION
wW--
a�
use
¢z
a
Dark brown TOPSOIL, loose, moist
TPSL'
,+
9.5
Brown silty SAND with gravel, loose to medium dense, moist (Weathered Till)
SM
MC = 16.00%
3.5
Gray brown well graded SAND with sift and gravel, medium dense to dense, moist
SW-
•;
5
SM
,-
MC = 12.60°x5
-becomes gray, very dense, moist (unweathered till)
Fines =11.50%
6.0 [USDA Classification: gravelly loamy Coarse SAND]
moderately cemented
Test pit terminated at 6.0 feet below existing grade_ No groundwater encountered during
excavation_
Bottom of test pit at 6.0 feet_
Earth Solution W TEST PIT NUMBER TP-2
1805 -136th N.E., Suite 201
PAGE 1 OF 1
Bellevue, Was ton 98005
Telephone: 425-449-4704
Fax: 425-449-4711
CLIENT Harbour Homes, LLC PROJECT NAME Stinde 13 lot Residential Plat
PROJECT NUMBER 4427 PROJECT LOCATION Renton, Washington
DATE STARTED 3/18116 COMPLETED 3118116 GROUND ELEVATION TEST PIT SIZE
EXCAVATION CONTRACTOR Client Provided GROUND WATER LEVELS:
EXCAVATION METHOD AT TIME OF EXCAVATION
LOGGED BY BJP CHECKED BY BJP AT END OF EXCAVATION —
NOTES Depth of Topsoil & Sod 4°- 6": long grass AFTER EXCAVATION —
w
ca
s
-
w
a j
TESTS
MATERIAL DESCRIPTION
M
0
Brown silty.SAND with gravel, loose to medium dense, moist (Weathered Till)
-becomes medium dense
SM
.
-becomes gray brown, dense, moist
MC=13.60°/6
s.s -becomes gray, very dense, moist (unweathered fitly
MC = 9.70%
-moderately cemented
Test pit terminated at 3.5 feet below existing grade. No groundwater encountered during
excavation.
Bottom of test pit at 3.5 feet.
I
1
1
I
I
1
1
1
i
i
i
i
Earth Solutio
1805 - 136th N.E,, Suite 201
Bellevue, Washington 98005
Telephone: 425-449-4704
Fax: 425-449-4711
4P TEST PIT NUMBER TP -3
PAGE 1 OF 1
CLIENT Harbour Hames, LLC ,. PROJECT NAME Stinde 13 Lot Residential Plat _
PROJECT NUMBER 4427 PROJECT LOCATION Renton, Washington
DATE STARTED 3118116 COMPLETED 3118/16 GROUND ELEVATION TEST PIT SIZE
EXCAVATION CONTRACTOR Client Provided GROUND WATER LEVELS:
EXCAVATION METHODAT TIME OF EXCAVATION
LOGGED BY BJP CHECKED BY _ BJP AT END OF EXCAVATION ---
NOTES Depth of Topsoil & Sod 6": grass AFTER EXCAVATION =
uJ
_
+K
�LU
LU
ESTS
MATERIAL DESCRIPTION
wV
a�
a O
Ck
z
c7
D
Brown silty SAND with gravel, loose to medium dense, moist (Fill)
SM
MC = 20.30%
2,0
Light brown silty SAND with gravel, loose to medium dense, moist (Native Weathered Till)
MC = 21.50%
-light groundwater seepage, piping
SM
-becomes gray brown, dense
5
MC = 16.10%
-becomes gray, very dense, moist (unweathered till)
8 5 -moderately cemented _
Test pit terminated at 6.5 feet below existing grade. Groundwater seepage encountered at 3.5
feet during excavation_
Bottom of test pit at 6.5 feet_
i
1
i
1
7
i
i1
S
a
Earth Solutio
1805 - 136th N.E., Suite 201
Bellevue, Washington 98005
Telephone: 425-449-4704
Fax: 425-4494711
CLIENT Harbour Homes, LLC
PROJECT NUMBER 4427
DATE STARTED 3118116 COMPLETED 3118116
EXCAVATION CONTRACTOR Client Provided
EXCAVATION METHOD
LOGGED BY BJP CHECKED BY BJP
NOTES Depth of Ta soil & Sod 16"- 18": grass
40 TEST PIT NUMBER TP -4
PAGE 1 OF 1
PROJECT NAME Stinde 13 Lot Residential Plat
PROJECT LOCATION Renton Washington
GROUND ELEVATION
GROUND WATER LEVELS -
AT TIME OF EXCAVATION
AT END OF EXCAVATION ---
AFTER EXCAVATION —
TEST PIT SIZE
uu
IL
WW
TO
. ,
U
TESTS
U
a. O
MATERIAL DESCRIPTION
O
g Z
r3
Q
rn
0
Dark grown TOPSOIL
TP5
L'
y5 r yt
1.5
Brown silty SAND with gravel, loose to medium dense, moist
SM
MC = 18.20°%
3.4
Brown gray well graded SAND with silt and gravel, medium dense, moist
-moderate groundwater seepage 3'- 5' (piping)
6
MC =18.40%
SW -
SM
.'
Fines = 8.94%
[USDA Classification: gravelly SAND]
-becomes gray, medium dense to dense, moist
MC = 16.80%
7.0
Test pit terminated at 7.4 feet below existing grade. Groundwater seepage encountered at 3'
to 5' feet during excavation.
Bottom of test pit at 7.0 feet.
}
'f
J
i
rJ
f
J
3
L
C
0
u
u
Earth Soluti w TEST PIT NUMBER TP -5
1805 - 136thWe N.E., Suite 201
PAGE 1 OF 1
Bellevue, Was ington 98005
Telephone: 425-449-4704
Fax: 425-449-4711
CLIENT Harbour Homes LLC PROJECT NAME Stinde 13 Lot Residential Plat
PROJECT NUMBER 4427 PROJECT LOCATION Renton, Washington
DATE STARTED 3118116 COMPLETED 3119116 GROUND ELEVATION TEST PIT SIZE
EXCAVATION CONTRACTOR Client Provided GROUND WATER LEVELS:
EXCAVATION METHOD AT TIME OF EXCAVATION —
LOGGED BY BJP CHECKED BY BJP AT END OF EXCAVATION --
NOTES Depth of Topsoil & Sod 6": sticker bushes dense AFTER EXCAVATION —
W
wv
pG
W
�
TESTS
U
1:
O
MATERIAL DESCRIPTION
az
rn
0
Brown silty SAND with gravel, loose to medium dense, moist (Weathered Till)
SM
s -oxide staining
Cray brown poorly graded SAND with silt and gravel, medium dense, moist
moderate groundwater seepage 1.5'- 2'
=
MC 14.10°%
SP_
SM
-becomes gray, very dense (unweathered till)
-moderately cemented
MC = 15.20%
4.5
Test pit terminated at 4.5 feet below existing grade. Groundwater seepage encountered at
1.5'- 2' feet during excavation.
Bottom of test pit at 4.5 feet.
Earth Solutiojmw IS TEST PIT NUMBER TP -6
1805 - 136t N.E., Suite 201 PAGE 1 OF 1
Bellevue, Was ington 98005
Telephone: 425-449-4704
Fax: 425-449-4711
CLIENT Harbour Hames LLC PROJECT NAME Stinde 13 Lot Residential Plat _
PROJECT NUMBER 4427 PROJECT LOCATION Renton, Washington
DATE STARTED 3118/16 COMPLETED 3/18116 GROUND ELEVATION
EXCAVATION CONTRACTOR Client Provided GROUND WATER LEVELS:
EXCAVATION METHOD AT TIME OF EXCAVATION =
LOGGED BY BJP CHECKED BY BJP AT END OF EXCAVATION
NOTES nth of Topsoil & Sod 20"- 24": sticker bushes dense other debris AFTER EXCAVATION —
TEST PIT SIZE
w
(_
�
Uj
m
TESTS
U
o p
MATERIAL DESCRIPTION
Lu
q
U)
D
Dark brown TOPSOIL, loose, moist
"
-metal debris
PSL
�.
20 _
Brown si@y SAND with gravel, loose to medium dense, moist (Weathered Till)
MC = 19.801A
Fines =12.40%
[USDA Classification: gravelly loamy SAND]
SM
moderate groundwater seepage at 3', becomes gray brown, medium dense
5
s.s -becomes gray, dense to very dense (urTweathered till)
MC =11.50%
\ moderately cemented
Test pit terminated at 5.5 feet below existing grade. Groundwater seepage encountered at 3.0
feet during excavation.
Bottom of test pit at 5.5 feet.
I
4
I
i
f
I
i
1
i
J
1
7
Earth Solutio TEST PIT NUMBER TP -7
1805 - 136th N.E., Suite 201 PAGE 1 OF 7
r Bellevue, Washington 98005
Telephone: 425-449-4704
Fax: 425494711
CLIENT Harbour Hames LLC PROJECT NAME Stinde 13 Lot Residential Plat —
PROJECT NUMBER 4427 PROJECT LOCATION Rentonl ashington
DATE STARTED 3118116 COMPLETED 3118116 GROUND ELEVATION TEST PIT 512E
EXCAVATION CONTRACTOR Client Provided GROUND WATER LEVELS:
EXCAVATION METHOD ATTIME OF EXCAVATION —
LOGGED BY BJP CHECKED BY BJP AT END OF EXCAVATION —
NOTES Depth of Topsoil & Sod 10"- 12": grass AFTER EXCAVATION –
w
o.
0
W
TESTS
`n
z
O
MATERIAL DESCRIPTION
Uj
_ja
to0_
2 z
C7
0
Brown silty SAND with gravel, loose, moist (Weathered Till)
SM
MC = 12.00%
1,8
MC = 13.30%
Brown poorly graded SAND with silt and gravel, loose to medium dense, moist
Fines = 11.80%
[USDA Classification_ very gravelly loamy SAND]
-becomes brown gray, medium dense
-becomes gray, dense to very dense, moist (unweathered Till)
5
-moderately cemented
=
MG 9.10%
SM
-cobbles
MC = 9.40%
es
Test pit terminated at 8.5 feet below existing grade. No groundwater encountered during
excavation.
Bottom of test pit at 8.5 feet.
i
i
1
a
7
i
i
f
7
1
i
0 0
Appendix B
Laboratory Test Results
ES -4427
Earth Solutions NW, LLC
Earth Solutiow GRAIN SIZE DISTRIBUTION
1805 - 136th N.i<., Suite 201
Bellevue, WA 98005
Telephone: 425-284-3300
CLIENT Harbour Homes LLC PROJECT NAME Stinde 13 Lot Residential Plat
PROJECT NUMBER ES -1427 PROJECT LOCATION Renton
NEW
O1111l1IH
im,
INNEII-11111
INN
In
in
Ell
01111111
UNION
III
liiiinmiiiiii
so
Hill
ME
I1111111I1II
I
IN
lllismillillowillill
immi-luillomill
1111
liiiismiiii
ONE""
In
lllismillillimmi
I!!%
�n
I
�Y�
■I�
0
■IIII�
Hillis
iiiiiinmiiiiiilm
INEIIHIIINE
INS
�
I
I
film��'
BoH11101
0 a
Report Distribution
ES -4427
EMAIL ONLY Harbour Homes, LLC
1441 North 341h Street, Suite 200
Seattle, Washington 98903
Attention: Mr. Chris Burrus
Earth Solutions NW, LLC
0 0
July 19, 2016
Project No. 16007
Matthew Herrera
City of Renton
1055 S Grady Way
Renton, Washington 98057
Re: The Pines Preliminary Plat, PRE16-000049
Dear Mr. Herrera:
This letter is provided to formally request modifications from RMC 4-6-060(F)(2), RMC 4-6-
060(H)(2), and RMC 4-6-060(J)(1). Specifically, the modification from RMC 4-6-060(F)(2) is
the request to allow for the reduction in pavement width and sidewalk width for Monroe Avenue
NE (minor arterial). Specifically, the modification from RMC 4-6-060(H)(2) is the request to
allow use of a hammerhead turnaround, in lieu of a cul-de-sac, on a dead end street that is
greater than 300 feet in length. Finally, the modification from RMC 4-6-060(J)(1) is the request
to allow the use of a shared driveway in a subdivision with more than ten lots.
RMC 4-6-060(F)(2) Background
Monroe Avenue NE is currently developed with approximately 44 -feet of pavement and curb
and gutter on both sides.
Modification Requested
RMC 4-6-060, Street Standards, F. Public Street Right -Of -Way Design Standards: A minor
arterial requires 91 -feet of right-of-way, 54 -feet of pavement width, 8 -feet of planter strip, and
sidewalk on both sides. The applicant is proposing to hold the existing curb line
(approximately 44 -feet of pavement width) and provide an 8 -foot planter strip and a 5 -foot
sidewalk.
Per the City of Renton Modification Submittal Requirements, in order to approve a modification
request, the following six conditions must exist:
1. Substantially implements the policy direction of the policies and objectives of the
Comprehensive Plan Land Use Element and the Community Design Element and the
proposed modification is the minimum adjustment necessary to implement these policies and
objectives.
2. Will meet the objectives and safety, function, appearance, environmental protection and
maintainability intended by the Code requirements, based upon sound engineering judgment.
3. Will not be injurious to other property(ies) in the vicinity.
4. Conforms to the intent and purpose of the Code.
620 71h Ave
Kirkland, WA 96033-5565
Phone: (425) 827-3063
Fax, (425) 827-2423
Toll Free: (800) 962-1402
www drslrong.corn
Engineers Surveyors Planners
0
Matthew Herrera
July 19, 2016
Page 2 of 6
0
5. Can be shown to be justified and required for the use and situation intended.
6. Will not create adverse impacts to other property(ies) in the vicinity.
Justification
1. The City's goal is to maintain the existing curb and gutter location and maintain the
bicycle corridor along Monroe Avenue NE. Maintaining the existing curb will provide
approximately 22 -feet from the existing centerline to the curb line. The intent of the 8 -foot
sidewalk is to allow for the bicycle lane to be transferred to the sidewalk area to create a multi-
use path. As stated above, Monroe Avenue NE is a dedicated bicycle corridor, therefore, an
additional bicycle lane or multi -use path is not necessary. Please see attached email from
Clark Close.
2. The modification will meet the objectives and safety, function, appearance,
environmental protection and maintainability by the Code.
3. Approval of the modification request would allow for development of this plat to maintain
the existing curb line and would avoid the removal of neighboring properties curbldriveways.
4. As discussed above, the modification conforms to the intent and purpose of the Code.
5, The City has determined, per the pre -application notes, that there is no intent to widen
the Monroe Avenue NE corridor. Thus, it is not practical to widen such a minor portion of the
corridor.
6. Approval of the modification request would allow for development of this plat to maintain
the existing curb line and would avoid the removal of neighboring properties curb/driveways.
0
Matthew Herrera
July 19, 2016
Page 3 of 6
RMC 4-6-060(H)(2) Background
The Project is proposing a dead end street less than 500 feet in length from Monroe Avenue
NE, east.
Modification Requested
RMC 4-6-060, Street Standards, H. Dead End Streets: For dead end streets from 300' to 500'
in length, a cul-de-sac is required. The applicant is proposing use of a hammerhead turn
around on a road that is 375 feet from the proposed curb line in Monroe Ave NE to the
centerline of the proposed hammerhead..
Per the City of Renton Modification Submittal Requirements, in order to approve a modification
request, the following six conditions must exist:
1. Substantially implements the policy direction of the policies and objectives of the
Comprehensive Plan Land Use Element and the Community Design Element and the
proposed modification is the minimum adjustment necessary to implement these policies and
objectives.
2. Will meet the objectives and safety, function, appearance, environmental protection and
maintainability intended by the Code requirements, based upon sound engineering judgment.
3. Will not be injurious to other property(ies) in the vicinity.
4. Conforms to the intent and purpose of the Code.
5. Can be shown to be justified and required for the use and situation intended.
6. Will not create adverse impacts to other property(ies) in the vicinity.
Justification
1. Providing a cul-de-sac turnaround with a right of way diameter of 110 feet is more than
50% of the total property width (property width is 216 feet) and greatly encumbers usable
space. The application of a cul-de-sac would better serve properties with greater dimensions
that allow for lot access around the circumference of the cul-de-sac and allow it be utilized to
its full potential. Approval of the modification request is the minimum modification to
accomplish the desired purpose.
2. The project proposes to terminate the proposed roadway with a hammerhead which is
an acceptable emergency vehicle turnaround. Additionally, the future homes in the entire plat
shall be required to be fire sprinklered_
3. Approval of the modification request would allow for development of this plat which
would be in line with the neighboring developments in size, magnitude and density. Granting
of this variance would not constitute special privilege inconsistent with projects in the vicinity
given that the cul-de-sac turnarounds in the immediate vicinity of the project are between 80
and 90 feet in diameter. The requirement for 110 feet in diameter encumbers the property
more significantly than any developments in the vicinity.
4. As discussed above, the modification conforms to the intent and purpose of the Code.
0
Matthew Herrera
July 19, 2016
Page 4 of 6
0
5. As discussed above, the required diameter size of the cul-de-sac is more than 50% of
the total property width. Therefore, it greatly encumbers the usable space. The hammerhead
still provides the necessary turnaround for fire.
6. Approval of the modification would not create adverse impacts to the adjacent
properties.
In addition, please see the attached letter and correspondence with Corey Thomas.
.0 0
Matthew Herrera
July 19, 2016
Page 5 of 6
RMC 4-6-0600)(1) Background
The Project is proposing a shared driveway to allow for rear access on two of the proposed
lots.
Modification Requested
RMC 4-6-060, Street Standards, J. Shared Driveway Standards: Shared driveways may be
allowed for access to four (4) or fewer residential lots, provided the subject lots are not created
by a subdivision of ten (10) or more lots. The applicant is proposing a shared driveway for two
of the proposed lots in order to allow for those lots to have rear access.
Per the City of Renton Modification Submittal Requirements, in order to approve a modification
request, the following six conditions must exist:
1. Substantially implements the policy direction of the policies and objectives of the
Comprehensive Plan Land Use Element and the Community Design Element and the
proposed modification is the minimum adjustment necessary to implement these policies and
objectives.
2. Will meet the objectives and safety, function, appearance, environmental protection and
maintainability intended by the Code requirements, based upon sound engineering judgment.
3. Will not be injurious to other property(ies) in the vicinity.
4. Conforms to the intent and purpose of the Code.
5. Can be shown to be justified and required for the use and situation intended.
6. Will not create adverse impacts to other property(ies) in the vicinity.
Justification
1. The City's goal is for subdivisions within the R8 zone to have alley loadirear access lots.
However, an alley is not feasible on this Project due to the width of the property. A shared
driveway will be utilized by two of the proposed lots in order to provide rear access. This will
be provided to meet the objectives/policies of the zoning.
2. The modification will meet the objectives and safety, function, appearance,
environmental protection and maintainability by the Code.
3. Approval of the modification request would not affect the surrounding properties.
4. As discussed above, the modification conforms to the intent and purpose of the Code.
5. The two proposed lots that will utilize the shared driveway have at least 50 linear feet of
public right-of-way. The shared driveway will be less than 200 feet in length. In addition, the
shared driveway is strictly provided for rear lot access on the lots. As discussed above, there
is no other way to provide rear access while still maintaining the number of lots. Thus, a
shared driveway has been chosen to provide the rear access.
6. Approval of the modification would not create adverse impacts to the adjacent
properties.
0 0
Matthew Herrera
July 19, 2016
Page 6 of 6
Thank you for your time and consideration in this matter. Should you have any questions or
request any clarifications, please do not hesitate to contact me.
Sincerely yours,
D. R. STRONG Consulting Engineers Inc.
Yoshio L. Piediscalzi, P.E.
Project Engineer
YLP/Ics
R:120161U1160071CorrespondencelLetterslout1L16007_16O6D6_Matlhew Herrera.dou
P
Sharedtnformation
From: Clark Close <CClose@Rentonwa.gov>
Sent: Thursday, February 11, 2016 1.40 PM
To: Maher Joudi
Subject: PRE16-000049 Stinde Preliminary Plat Preapp
Attachments: 16-000049 (R-8 5tinde Pre Plat) Meeting Summary_pdf
Maher,
Here is some follow-up information from your plan reviewer regarding moving the curb rather than maintaining the curb
at its current location.
Given the corridor is a dedicated bicycle corridor, transportation is not willing to allow relocation of the curb. However,
they would support a modification to reduce the sidewalk from 8 -ft to 5 -ft, which would only require 3.S feet of
dedication in lieu of 6.S feet.
Thanks,
Clark H. Close
City of Renton — Current Planning
Senior Planner
Tel: 425-430-7289
0 0
March 22, 2016
Project No. 16007
Corey Thomas
City of Renton
1065 S Grady Way
Renton, Washington 98057
Re: Stinde Preliminary Plat, PRE16-000049
Dear Mr. Thomas:
This letter is provided to formally request modification from RMC 4-6-060(H)(2). Specifically,
the request to allow use of a hammerhead turnaround, in lieu of a cul-de-sac, on a dead end
street that is greater than 300 feet in length.
Background
The Project is proposing a dead end street less than 500 feet in length from Monroe Avenue
South, east.
Variance Requested
RMC 4-6-060, Street Standards, H. Dead End Streets: For dead end streets from 300' to 500'
in length, a cul-de-sac is required. The applicant is proposing use of a hammerhead turn
around on a road that is 385 feet from the proposed curb line in Monroe Ave NE to the
centerline of the proposed hammerhead.
Per the City of Renton Variance Submittal Requirements, in order to approve a variance
request, the following four conditions must exist:
1. The applicant suffers undue hardship and the variance is necessary because of special
circumstances applicable to the subject property, including size, shape, topography, and
location or surroundings of the subject property; and the strict application of the Building and
Zoning code is found to deprive subject property owner of rights and privileges enjoyed by
other property owners in the vicinity and under identical classification.
2. The granting of the variance will not be materially detrimental to the public welfare or
injurious to the property or improvements in the vicinity and zone in which subject property is
situated.
3. Approval shall not constitute a grant of special privilege inconsistent with the limitation
upon uses of other properties in the vicinity and zone in which the subject property is situated.
4. The approval, as determined the Reviewing Official, is the minimum variance that will
accomplish the desired purpose.
620 7th Ave
Kirkland, WA 98033-5565
Phone: (425) 827-3063
Fax (425) 827-2423
Toll Free (800) 962-1402
www _d rstrong.ccrn
Engineers f SurveyorsI Planners
Corey Thomas
March 22, 2046
Page 2 of 2
Justification
1. Providing a cul-de-sac turnaround with a right of way diameter of 110 feet is more than
50% of the total property width (property width is 210 feet) and greatly encumbers usable
space. The application of a cul-de-sac would better serve properties with greater dimensions
that allow for lot access around the circumference of the cul-de-sac and allow it be utilized to
its full potential.
2. The project proposes to terminate the proposed roadway with a hammerhead which is
an acceptable emergency vehicle turnaround. Additionally, the hammerhead will meet the
required dimensional standards and be adequately signed, rNo Parking' -.i
3. Approval of the variance request would allow for development of this plat which would
be in line with the neighboring developments in size, magnitude and density. Granting of this
variance would not constitute special privilege inconsistent with projects in the vicinity given
that the cul-de-sac turnarounds in the immediate vicinity of the project are between 80 and 90
feet in diameter. The requirement for 110 feet in diameter encumbers the property more
significantly than any developments in the vicinity.
4. Approval of the variance request is the minimum variance to accomplish the desired
purpose.
Thank you for your time and consideration in this matter. Should you have any questions or
request any clarifications, please do not hesitate to contact me.
Sincerely yours,
D. R. STRQNG Consulting Engineers Inc.
Pknd A. 5, P.E.
P nci r.r. Vice President
Director of Engineering
MAJllcs
RM1601 60071CorrespondencelLetterslout1L16007_160322_Coryihomas.dou
110
SharedInformation
From: Corey W Thomas <CThomas@Rentonwa.gov>
Sent: Wednesday, April 06, 2016 4:18 PM
To: Maher Joudi
Cc: Jamie Waltier; Chris Burrus �CBurrus@harbourhomes.com); Clark Close
Subject: RE: Stinde Preliminary Plat Hammerhead Variance Request PRE16-000049
Attachments: turnaround_pdf
Maher,
The fire chief has approved your variance request with the condition that all future homes in the entire plat shall require
an approved residential fire sprinkler system. The placement and configuration of the hammerhead turnaround shall be
a mutually agreed upon location to be determined by the planning and fire department. The hammerhead shall meet all
fire department specifications, see attached above. Contact Clark Close for exact placement of the hammerhead.
#�wro
Corey Thomas
Fire Plans Reviewer/Inspector III Olt
City of Renton Fire & Emergency Services Department
COMMUNITY RISK REDUCTION
Phone: 425-430-7024 Fax: 425-430-7022
Email: cthomas(5rentonwa.gov
1055 South Grady Way
Renton, WA 98057-3232
Professionalism • Integrity • Leadership • Accountability • Respect
From: Maher Joudi[ mai Ito: maher.joudi@d rstrong.com]
Sent: Tuesday, March 22, 2016 18:33
To: Corey W Thomas
Cc: Jamie Walter; Chris Burrus (CBurrus@harbourhomes.com)
Subject: Stinde Preliminary Plat Hammerhead Variance Request PRE16-000049
Hi Corey,
We are moving forward on this project and per your comments at the pre app, I am emailing a letter requesting
allowance of a hammerhead on a dead end road longer than 300'.
Please see attached.
Thanks Corey.
D.R. STRONG
Consulting
Engineers Inc.
CIVIL ENGINEERS PLANNERS
Maher A. Joudi, P.E.
Principal, Sr. Vice President
Director of Engineering
620 7th Avenue
Kirkland, WA 98033
Office: (425) 827-3063
0
0
TECHNICAL INFORMATION REPORT
for
THE PINES
PRELIMINARY PLAT
850 & 870 Monroe Avenue NE, Renton, Washington
DRS Project No. 16007
Renton File No. LUA16-000413
Owner/Applicant
Harbour Homes, LLC
400 North 34th Street, Suite 300
Seattle, Washington 98103
Report Prepared by
.DD JJ
D. R. STRONG Consulting Engineers, Inc.
620 7"' Avenue
Kirkland, WA 98033
(425) 827-3063
Report Issue Date
July 19, 2016
42016 D. R. STRONG consulting Engineers Inc. The Pines
Technical Information Report Renton, Washington
TECHNICAL INFORMATION REPORT
THE PINES PRELIMINARY PLAT
TABLE OF CONTENTS
SECTIONI ...................................................................................................................... 1
ProjectOverview ....................................................... ...... .......................................... J
Predeveloped Site Conditions ..................................................................................... 1
Developed Site Conditions .......................................................................................... 1
SECTION11 ............................................................ ...................................................... 11
Conditions and Requirements Summary ................................................................... 11
Conditionsof Approval ............................................................................................... 13
SECTIONIII .................................................................................................................. 14
Off -Site Analysis ................................................................. — .................................... 14
Task 1: Define and Map Study Area ............ ...................... .................................. 15
Task 2: Resource Review ...................................................................................... 16
Task 3: Field Inspection ...................................................................... .................. 25
Task 4: Drainage System Description and Problem Descriptions .......................... 26
Task 5: Mitigation of Existing or Potential Problems .............................................. 29
SECTIONIV .................................................................................................................. 35
Flow Control Analysis and Water Quality Design ...................................................... 35
ExistingSite Hydrology .......................................................................................... 35
Developed Site Hydrology ...................................................................................... 37
Performance Standards ............................................................................................. 40
FlowControl System ................................................... .............................................. 41
Water Quality Treatment System ............................................................................... 47
SECTIONV ................................................................................................................... 49
Conveyance System Analysis and Design ................................................................ 49
SECTIONVI .................................................................................................................. 50
Special Reports and Studies ..................................................................................... 5C
SECTIONVII................................................................................................................. 51
Other Permits, Variances and Adjustments ............................................................... 51
SECTIONVill ................................................................................................................ 52
CSW PPP Analysis and Design (Part A) .................................................................... 52
SWPPP Plan Design (Part B) .................................................................................... 52
SECTIONIX .................................................................................................................. 54
Bond Quantifies, Facility Summaries, and Declaration of Covenant .......................... 54
Stormwater Facility Summary Sheet .......................................................................... 55
02016 D. R. STRONG Consulting Engineers Inc. The Pines
Technical Information Report Renton, Washington
i 0
SECTIONX................................................................................................................... 57
Operations and Maintenance Manual ........................ .... 57
APPENDICES............................................................................................................... 58
Appendix .,A„ Legal Description................................................................................. 59
List of Figures
Figure1 TIR Worksheet.................................................................................................. 2
Figure2 Vicinity Map....................................................................................................... 7
Figure 3 Drainage Basins, Subbasins, and Site Characteristics ..................................... 8
Figure4 Soils..................................................................................................................
9
Figure 5 City of Renton Topography Map.....................................................................17
Figure 6 City of Renton Coal Mine Hazard Areas Map ..................................................
18
Figure 7 City of Renton Flood Hazards Map.................................................................19
Figure 8 City of Renton Streams and Wetlands Map ....................................................
20
Figure 9 City of Renton Landslide Hazards Map...........................................................
21
Figure 10 City of Renton Seismic Hazard Areas Map ...................................................
22
Figure 11 FEMA Map................................................................23
Figure 12 King County iMap Drainage Complaints Map ................................................
24
Figure 13 Offsite Analysis Downstream Map................................................................
30
Figure 14 Offsite Analysis Downstream Table..............................................................
31
Figure 15 Predeveloped Area Map................................................................................
36
Figure 16 Developed Area Map....................................................................................
39
Figure 17 Detention & Water Quality Facility Details .....................................................
48
©2016 D. R. STRONG Consulting Engineers Inc. The Pines
Technical Information Report Renton, Washington
0
SECTION I
PROJECT OVERVIEW
0
The Project is the proposed subdivision of two parcels into 14 single-family residential
lots, per the City of Renton's (City) subdivision process. The Project is located at 850 &
870 Monroe Avenue NE, Renton, Washington (Site) also known as Tax Parcel Numbers
092305-9116, & -9117. The Project will meet the drainage requirements of the 2009
King County Surface Water Design Manual (Manual), as adopted by the City.
PREDEVELOPED SITE CONDITIONS
The total existing Site area is approximately 107,969 s.f. (2.48 acres). The Site is
currently developed with two single family homes, gravel driveways, one detached
garage, two sheds, a barn, and landscaping. The south-eastern portion of the Site
appears to be undisturbed and in a forested condition with light underbrush.
A high point exists at the eastern property line of the Site creating a shallow grade west
maintaining one Threshold Discharge Areas (TDA). Runoff generated by the TDA
gradually sheet flows east to west towards Monroe Avenue NE. The Natiral Discarge
Area (NDA) of the Site is runoff sheet flow over the west property line. Sheet flow is
captured by the curb and gutter located on the east side of Monroe Ave NE where
runoff then enters one of two, type 1 catch basins creating two downstream paths.
Runoff collected by the two catch basins is conveyed to a 24" diameter pipe where the
two downstream paths converge and flow south through the existing stormwater
system.
DEVELOPED SITE CONDITIONS
The applicant is seeking approval to subdivide 2.48 acres into 14 single—family
residential lots (Project), with lot sizes ranging from approximately 5,000 s.f. to 5,201 s.f.
All existing improvements located on the Site will be demolished or removed during plat
construction.
The project is required to provide level 2 flow control and basic water quality treatment.
The Site falls within the Peak Rate Flow Control Stadard area matching existing Site
conditions. The proposed impervious surface areas are as follows: frontage
improvements consisting of a 5' sidwalk along Monroe Ave NE, Road A, the 14 new
single-family residences and their driveways, Tract B, and Tract D, the detention facility,
will generate approximately 64,927 s.f. of impervious area (1.49 acres). This
impervious area includes the bypass area, but excludes 2,914 s.f. of upstream tributary
area. The remainder of the developed Site will be modeled as till grass 41,487 s.f. (0.95
acre).
A small portion of ROW frontage on Monroe Ave NE, along the north half of the Site will
be bypass. Bypass runoff will continue along its current flow path and converge with the
Site runoff after detention, flowing south within the Monroe Ave NE conveyance system.
(See Section IV).
@2016 D_ R. STRONG consulting Engineers Inc. Page 1 The Pines
Technical Information Report Renton, Washington
0 0
FIGURE 1
TIR WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER
Project Owner:
Harbour Homes, LLC
Phone:
(206) 315-8130
Address:
400 North 341h St, Suite 300
FEMA Floodplain
Seattle, WA 98103
Project Engineer:
Yoshio L. Piediscalzi, P.E.
Company:
D. R. STRONG Consulting
dates):
Engineers Inc.
Phone:
425 827-3063
Part 3 TYPE OF PERMIT APPLICATION
® Landuse Services
Subdivision 1 Short Subdivision ! UPD
❑ Building Services: M!F I Commercial I SFR
® Clearing and Grading
❑ Right -of -Way
❑ Other:
Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Name: The Pines
City Permit#: U 2016-OXXXX
Location:
Township: 23 North
Range: 05 East
Section: 09
Site Address: 850 & 870
Monroe Avenue NE
Renton, WA
Part4 OTHER REVIEWS AND PERMITS
❑
DFW HPA
❑
COE 404
❑
DOE Dam Safety
❑
FEMA Floodplain
❑
COE Wetlands
❑
Other:
❑
Shoreline Mngmt
®
Structural
Type of Drainage Review Full 1 Targeted I
Rockery/Vault
❑
ESA Section 7
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report
Site Improvement Plan (Engr. Plans)
Type of Drainage Review Full 1 Targeted I
Type (circle one): Full I Modified 1
(circle): Large Site
Small Site
Date (include revision July 19th, 2016
Date (include revision
dates):
dates):
Date of Final:
Date of Final:
Part 6 ADJUSTMENT APPROVALS
Type (circle one): Standard ! Complex ! Preapplication ! Experimental 1 Blanket
Description: (include conditions in TIR Section 2)
Date of Approval:
@2016 D_ R. STRONG Consulting Engineers Inc. Page 2 The Pines
Technical Information Report Renton, Washington
0 0
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No
Start Date:
Completion Date
TBD
Describe: Monitor_ dischargelocation
during construction.
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan: Highlands
Special District Overlays: N/A
Drainage Basin: East Lake Washin_ tctoon - Renton_
Stormwater Requirements: Level 2 Flow Control and Basic WQ treatment
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
❑ River! Stream
❑
Steep Slope
❑ Lake
❑
Erosion Hazard
❑ Wetlands
❑
Landslide Hazard
❑ Closed Depression
❑
Coal Mine Hazard
❑ Floodplain
❑
Seismic Hazard
❑ Other
❑
Habitat Protection
Part 10 SOILS
Soil Type Slopes Erosion Potential
AmC 6-15% Moderate to Severe
❑ High Groundwater Table
❑ other
❑ Additional Sheets Attached
❑ Sole Source Aquifer
❑ Seeps/Springs
t�)2016 D. R. STRONG Consulting Engineers Inc. Page 3 The Pines
Technical Information Report Renton, Washington
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE
® Core Requirement #2 — Offsite Analysis
® SEPA „
LIMITATION / SITE CONSTRAINT
of one TDA
El
Core Requirements (all 8 apply)
El
Number of Natural Discharge Locations: I
Additional Sheet Attached
Level: 1 / 213 dated: 03121/16
Part 12 TIR SUMMARY SHEET
Threshold Discharge Area: Site comprised
of one TDA
(name or description)
Core Requirements (all 8 apply)
Discharge of Natural Location y2s
Number of Natural Discharge Locations: I
Offsite Analysis
Level: 1 / 213 dated: 03121/16
Flow Control
Level: 1/213 or Exemption Number
(incl. facility summary sheet
Small Site BMPS NIA
Conveyance System
Spill containment located at: TBD
Erosion and Sediment Control
ESC Site Supervisor: T/B/D
Contact Phone: TIB1D
After Hours Phone: T/BID
Maintenance and Operation
Responsibility: Private / Public
If Private, Maintenance Log Required: Yes ! No
Financial Guarantees and
Provided: Yes/ No
Liability
Water Quality
Type: Basic / Sens Lake / Enhanced Basic ! Bog
(include facility summary sheet)
or exemption No.
Landscape Management Plan: Yes / No
Special Requirements (as applicable)
Area Specific Drainage
Type: CDA 1 SDO 1 MDP 1 BP / LMP / Shared 1 None
Requirements
Name:
Floodplain/Floodway Delineation
Type: Major / Minor / Exemption / None
100 -year Base Flood Elevation (or range):
Datum:
Flood Protection Facilities
Describe: N/A
Source Control
Describe Landuse:
(comm. / industrial landuse)
Describe any structural controls:
Oil Control
High -use Site: Yes 1 No
Treatment BMP:
Maintenance Agreement: Yes / No
with whom?
©2016 D. R. STRONG Consulting Engineers Inc. Page 4 The Pines
Technical Information Report Renton, Washington
011
0
Other Drainage Structures
Describe: Runoff will be collected and conveyed to the wet -vault detention facility
located in Tract D.
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
Type/Description
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
T e/Descrlition
AFTER CONSTRUCTION
® Clearing Limits
® Stabilize Exposed Surfaces
® Remove and Restore Temporary ESC
® Cover Measures
Facilities
® Perimeter Protection
® Clean and Remove All Silt and
® Traffic Area Stabilization
Debris, Ensure Operations of
Permanent Facilities
® Sediment Retention
® Flag Limits of SAO and open space
® Surface Water Collection
Preservation areas
❑ Other
❑ Dewatering Control
® Dust control
® Flow Control
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note; Include Facility Summary and Sketch
Flow Control
Type/Description
Water Quality
T e/Descrlition
® Detention
❑ Infiltration
❑ Regional
Facility
❑ Shared Facility
❑ Flow Control
BMPs
❑ Other
Vault
❑ Biofiltration
® Wetpool
❑ Media Filtration
❑ Oil Control
❑ Spill Control
❑ Flow Control
BMPs
❑ Other
Wet -vault
02016 D. R. STRONG Consulting Engineers Inc. Page 5 The Pines
Technical Information Report menton, Washington
Part 15 EASEMENTS/TRACTS
❑ Drainage Easement
❑ Covenant
❑ Native Growth Protection Covenant
® Tract
❑ Other:
Part 16 STRUCTURAL ANALYSIS
® Cast in Place Vault
❑ Retaining Wall
❑ Rockery > 4' High
❑ Structural on Steep Slope
❑ Other:
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as
observed were Incorporated Into this worksheet and the attached Technical Information
Report. To the best of my knowledge the information provided here is accurate.
V./e 6�'q ?-Iq-l�
ned/Date
02016 D. R. STRONG consulting Engineers Inc. Page 6 The Pines
Technical Information Report Renton, Washington
FIGURE 2
VICINITY MAP
King County Wap I
The information included on this map has been compiled by King County staff from a variety of sources and is subject to change
without notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness,
or rights to the use of such information. King County shall not be liable for any general, special, indirect, incidental. or consequential
damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on
this map. Any sale of this map or information on this map is prohibited except by written permission of King County.
CJ2016 D. R. STRONG Consulting Engineers Inc. Page 7 The Pines
Technical Information Report Renton, Washington
.t�... lilt
1 j'.��I -�1� ►!'ll4f �.
Ii'l tnT
ff
l�L*er-:-4�r
LSI.
- 1 . '�� �
tet" '
` • Iyf' � t. j �.. ___L' I -'-� � I..:.- I I hl it 4S
*`= I -,
��e
flt;tilt� •_[�. I i I. on 'I `; ':J.�_
i
,j" r;u
i j- ',
,' -•.1. Yr ~.� > i_i•`1
i' .' NF. "iL�rt1 11
-f
1 t
At
A. f '4.+ I' - -S ...... �'-- 1 E)! i
t
r�
fry_ Ct - to un .e . L_
'-
a13� %?�St . no.' M x S.L Cnr: -E.n'C T�Q7A'a S wrrA sheaf �t1ec � � �"V
ax x�1:r'4YYt�l a'1`MM 4.OYY�'s Aao�u-'.aMvw "l orJ►�i+0: n[OF
b sea G, Ghon, Sli=.�:, avib Gl 'aoa6Y, 6fYY bl:i NK^. MOYa,b
a orWas �_nrt x' mac'. F+ka' cT.'C.eA.e s: Srs Ta_[� a »+ QSCEWM
44+Vv GGRI Vv ��a�.�. P'YYvf�so-r�s c®oob a,
ale' p -.e crY R.9
DAM 321201C
The information included on this map has been compiled by King County staff from a variety of sources and is subject to change
without notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness,
or rights to the use of such information. King County shall not be liable for any general, special, indirect, incidental. or consequential
damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on
this map. Any sale of this map or information on this map is prohibited except by written permission of King County.
CJ2016 D. R. STRONG Consulting Engineers Inc. Page 7 The Pines
Technical Information Report Renton, Washington
FIGURE 3
DRAINAGE BASINS, SUBBASINS, AND SITE CHARACTERISTICS
©2416 D. R. STRONG Consulting Engineers Inc. Page 8 The Pines
Technical Information Report Renton, Washington
3
x
Or r, �cl
-
.nisA9alwrurrr�r
VALALTAYLET
q
fura,Ruorsuaaue.�x
sarMWIEMPRWERTYOW —
Aysa®r2aaAC)
DNA -
O NA
+xxr
OPNQRTH
oeene sc.uc
0 b W
r7:I,.p16�U11tiU0J1!IUchlnpstF"ofal/.ipwerlFfW3A 51N rtep (�,'Ki,�C161-,R]-$3Pll cwweii �Fl lwF. a.e Fwa.F <_�w rvr, rxeusn
M .r CS -Sl
M
MRM d1
0
FIGURE 4
SOILS
� Y
00809'5 MWS MOWS Of M MM MOWS CHOWS WDWS Wim Mow's 00109S
02016 D. R. STRONG Consulting Engineers Inc. Page 9 The Pines
Technical Information Report Renton, Washington
0
King County Area, Washington
11
AmC—Arents, Alderwood material, 6 to 75 percent slopes
Map Unit Setting
• National map unit symbol: 9hmsq
• Mean annual precipitation: 35 to 60 inches
• Mean annual air temperature: 50 degrees F
Frost -free period: 950 to 200 days
• Farmland classification: Not prime farmland
Map Unit Composition
• Arents, alderwood material, and similar sails: 100 percent
• Estimates are based on observations, descriptions, and transects of the map unit.
Description of Arents, Alderwood Material
Setting
• Landform: Till plains
• Parent material: Basal till
Typical profile
• H1 - 0 to 26 inches: gravelly sandy loam
• H2 - 26 to 60 inches: very gravelly sandy loam
Properties and qualities
• Slope: 6 to 15 percent
• Depth to restrictive feature: 20 to 40 inches to densic material
• Natural drainage class: Moderately well drained
• Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately low (0.00 to 0.06 inlhr)
• Depth to water table: About 16 to 36 inches
• Frequency of flooding: None
• Frequency of ponding: None
• Available water storage in profile: Very low (about 2.3 inches)
Interpretive groups
• Land capability classification (irrigated): None specified
• Land capability classification (nonirrigated): 4s
• Hydrologic Soil Group: BID
See Appendix B for Geotechnical Engineering Study
02016 D. R. STRONG Consulting Engineers Inc. Page 10 The Pines
Technical Information Report Renton, Washington
SECTION II
CONDITIONS AND REQUIREMENTS SUMMARY
The Project must comply with the following Core and Special Requirements:
• C.R. #1 — Discharge at the Natural Location: Existing drainage discharges the
Site at one location, maintaining one TDA. The topography indicates that all
stormwater runoff leaves the Site as sheet flow across the west property line.
Runoff is collected by the curb and gutter on the east side of Monroe Avenue NE.
• C.R. #2 — Offsite Analysis: Analysis is included in Section III. The Analysis
describes the Site's runoff patterns in detail.
C.R. #3 — Flow Control: The Project is required to adhere to Level 2 Flow Control
Standards. One detention/wetvault will provide flow control as required for the new
and replaced impervious and pervious surfaces. The Site is required to "match
developed discharge durations to existing conditions durations for the range of
predeveloped discharge rates from 50% of the two-year peak flow up to the full 50 -
year peak flow. Also match developed peak discharge rates to predeveloped peak
discharge rates for the 2 and the 10 year return periods," (City of Renton 2009
Surface Water Design Manual Amendment, Sec. 1.2.3.1). A detention vault will
accommodate this requirement.
• C.R. #4 — Conveyance System: New pipe systems are required to be designed
with sufficient capacity to convey and contain (at minimum) the 25 -year peak flow,
assuming developed conditions for onsite tributary areas and existing conditions for
any offsite tributary areas. Pipe system structures may overtop for runoff events that
exceed the 25 -year design capacity, provided the overflow from a 100 -year runoff
event does not create or aggravate a "severe flooding problem" or "severe erosion
problem" as defined in C.R. #2. Any overflow occurring onsite for runoff events up to
and including the 100 -year event must discharge at the natural location for the
project site. In residential subdivisions, such overflow must be contained within an
onsite drainage easement, tract, covenant or public right-of-way. This analysis will
be performed at time of construction plan preparation.
• C.R. #5 — Erosion and Sediment Control: The Project will provide the seven
minimum ESC measures. A temporary erosion and sedimentation control plan will
be prepared at the time construction plan preparation.
• C.R. #6 — Maintenance and Operations: Maintenance of the proposed storm
drainage facilities will be the responsibility of the City. An Operation and
Maintenance Manual will be included in Section X at the time of construction plan
preparation.
C.R. #T — Financial Guarantees: Prior to commencing construction, the Applicant
must post a drainage facilities restoration and site stabilization financial guarantee.
For any constructed or modified drainage facilities to be maintained and operated by
the City, the Applicant must: 1) Post a drainage defect and maintenance financial
guarantee for a period of two years, and 2) Maintain the drainage facilities during the
(02016 D. R. STRONG Consulting Engineers Inc. Page 11 The Pines
Technical Information Report Renton, Washington
two-year period following posting of the drainage defect and maintenance financial
guarantee.
• C.R. #8 — Water Quality: The Project is required to provide basic water quality
treatment. A wetvault will accommodate this requirement.
• S.R. #1 — Other Adopted Area-Specific Requirements: Not applicable for this
Project.
• S.R. #2 — Floodplain/Floodway Delineation: Not applicable for this Project.
• S.R. #3 — Flood Protection Facilities: Not applicable for this Project.
• S.R. #4 — Source Control: Not applicable for this Project.
• S.R. #5 — Oil Control: Not applicable for this Project.
• S.R. #6 — Aquifer Protection Area: Site not located within zones 1 and 2, therefore
not applicable for this Project.
02016 D. R. STRONG Consulting Engineers Inc. Page 12 The Pines
Technical Information Report Renton, Washington
0
CONDITIONS OF APPROVAL
The Pines U 2018-OXXXX
kj :39]
(D2016 D. R. STRONG Consulting Engineers Inc. Page 13 The Pines
Technical Information Report Renton, Washington
SECTION III
OFF-SITE ANALYSIS
An offsite Level One Downstream Analysis was prepared by D.R. STRONG Consulting
Engineers Inc. and is included in this section.
02016 D. R. STRONG Consulting Engineers Inc. Page 14 The Pines
Technical Information Report Renton, Washington
011 0
LEVEL ONE DOWNSTREAM ANALYSIS
DISCLAIMER:
This report was prepared at the request of HARBOUR HOMES, Ilc for the 2.8 acre
parcel known as a portion of the SOUTHWEST Quarter of Section 09, Township 23
North, Range 5 East, W.M., in King County, Tax Parcel Numbers 092305-9916, & -9117
(Site). D. R. STRONG Consulting Engineers Inc. (DRS) has prepared this report for the
exclusive use of DRS, the owner, and their agents, for specific application to the
development project as described herein. Use or reliance on this report, or any of its
contents for any revisions of this project, or any other project, or by others not described
above, is forbidden without the expressed permission by DRS.
TASK 1: DEFINE AND MAP STUDY AREA
This Offsite Analysis was prepared in accordance with Core Requirement #2, Section
1.2.2 of the 2009 King County Surface Water Design Manual and City Amendments as
adopted by the City of Renton (Manual). The Site is located at 850 & 870 Monroe
Avenue NE, Renton, Washington. The Project is the subdivision of three parcels into 14
single-family lots.
See Figures 1, 2, 3, and 5 for maps of the study area.
02016 D. R. STRONG Consulting Engineers Inc. Page 15 The Pines
Level One Downstream Analysis Renton, Washington
0 0
TASK 2: RESOURCE REVIEW
• Adopted Basin Plans: The City of Renton and King County Department of
Development and Environmental Services (DDES) and Department of Natural
Resources and Parks (DNRP) do not have a specific plan for the East Lake
Washington Drainage Basin.
• Finalized Drainage Studies: No available applicable drainage studies at this time.
• Basin Reconnaissance Summary Reports: None available.
• Comprehensive Plans: Renton's Comprehensive Plan, adopted on June 22, 2015,
effective July 1, 2015.
• Floodplain/Floodway (FEMA) Map: No floodplains exist on site, See Figure 10.
• Other Offsite Analysis Reports: Albert Balch's President Park No. 7 & No. 8 and
Skyland Heights No. 2.
• Sensitive Areas Map Folios: See Figures 6-9.
• DNRP Drainage Complaints and Studies: Per King County Water and Land
Resources Division, there were no complaints within the downstream paths, within
approximately one mile from the Site within the last 10 years. See figure 11.
• USDA King County Soils Survey: See Figure 4
• Wetlands Inventory: Vol. 2 East (1990) — No wetlands identified along the
downstream paths in the KC Wetlands Inventory. The City of Renton Mapping
Applications indicates there are also no wetlands along the downstream path. See
Figure 8.
• Migrating River Studies: The Site is not located near the channel migration zones of
Cedar River, Tolt River, Raging River, Snoqualmie River, or Green River.
• King County Designated Water Quality Problems: Per the Washington State Water
Quality Assessment 303(d)1305(b) Integrated Report current as of 2012, there are
no water quality problems within 1 mile downstream of the Site.
02016 D. R. STRONG Consulting Engineers Inc. Page 16 The Pines
Level One Downstream Analysis Renton, Washington
FIGURE 5
CITY OF RENTON TOPOGRAPHY MAP
11otes
r apsgra>trr
5a 0 129 2F$ Fer
rG,_tg=s_We6_µefC-V r Atiz'lar} 9pr.rre
City OLReff foh.il
Finance & I'I' Division
Legend
Cry iced county s«,ndary
G* C Na tv
Parctk
10p' Pnm.�ry
10V 1W*Trr0d13te
20' Pnrna+y
20' 1nterrnedlaoe
t Prirrary
R' Inf.mrimt.
WpfibW Towww* yy • Gt6 -x a v r. y-t-a:r::•rc � +:- a r.. _. _
._ _..
1ZYr:+a, -» a: a. ,w cr Y,: -'!r-1 Is. 1.
go.
S n i a THIS VAC 1.". NOT TO 6E U-�EO FOR NAWGATH
0)2016 D. R. STRONG Consulting Engineers Inc. Page 17 The Pines
Level One Downstream Analysis Renton, Washington
FIGURE 6
CITY OF RENTON COAL MINE HAZARD AREAS MAP
Notes Lege n0
Coa M ne Ka:7rN wap Cry and Canty Boundary
Cee.
w r.*rftr
MGM
i.
e►oCEPa�'E
Oa3 0 !�12 1_023��
4G9_ 1 riSi_V1ec_Yeralor_A�aA:ary_6MNt
Cit)' u[ Olf'1
Finance & ET Diviskin
k*Wmadon Twwbobm • = —a:. _ ;.:r -tart= ac : x'r.• �,� Y .�•e•.r —acs^t -'r s-+'
Re�1�riliapit{�On$1{N dOP1Y1QOY '';�^".3 Y O T : ^.].- ",T,
321,':016 TM9'5 uAD L� NOT TO 5E USED FOR 4W ; *N
02016 D. R. STRONG Consulting Engineers Inc. Page 18 The Pines
Level One Downstream Analysis Renton, Washington
FIGURE 7
CITY OF RENTON FLOOD HAZARDS MAP
Site
Nous Legend
F*ao r "rx ua,^ cry 3na C—Ity @otntda7
ore.
"' a"W x
?aroe+s
Fkoeway
Smoal Mood Hazard Areas 1100
year flood)
12 0 256 S • 2 Bret 00w Flood Areas iZone X - 5W
year flood I
vG'_t4l.+ viceo_wercasx_a.wJ;ary_�yrere
FinamC&.II DIN- un
%*XT d0M TKNbftg - GLS = -a; : a F- 7re•Y!^.:�: ,�.:.: ^-•- r ',r,• -•-r ^',accr; :^.e a•.:
��,�� � : •r r+�r.+:r �.:; �.v�,a�- ra: aa:-� v � : -x ra xis R.Y r.
a:=tat cr--.c �• x� _-i.x _
3'21:20 id TMI1� UAP r,, NOT TO B'. JGE0 FOR NAVlGAMON
72016 D. R. STRONG Consulting Engineers Inc, Page 19 The Pines
Level One Downstream Analysis Renton, Washington
0
0
FIGURE 8
CITY OF RENTON STREAMS AND WETLANDS MAP
Notes
-ems and %*U- as va;
EA
12 0 254 512 °M
JG�_fk7.t_V1eG_Mlres� Autl;;arp_��r
City
Reirro—h
I-inancc S- I I Dwlm4m
Site
Legend
Cry and Garrty sou-dary
c-
Cri a• Rem
Parcets
Svevns iCLUSdirdJ
'yu E
�IR r
wedantls
W W WOM T$dVK M - CIS --r r-r-xr: Vs : �r_� *: — r .•err ^�cr,- • •. a1
3r2177D1 a THiy WP sr NOT TO BE vGED FOR xAv1GAT*N
C,2016 D. R. STRONG Consulting Engineers Inc. Page 20 The Pines
Level One Downstream Analysis Renton, Washington
0
0
FIGURE 9
CITY OF RENTON LANDSLIDE HAZARDS MAP
Site
N01e5
Legend
La,061*e -IIZJfW vap
Cry arra County Boundary
eve.
L GG �' Rirrcr
Parcels
LsndsisGde
■ lifer
E) "elm -e
4:a WeD Merc-�Aw:iaq_Sp-rwt
:F+:L/1CtAED
City of 111!1
finance & IT Division
■wwrosom T*Mno pQy -GIS x : e _•.r �r-ra�r. .•r. _r_-: r .r-�r -.�:r ::r s
.. ..4•T'..' ! . �d� .3f�'= fid'. A::Rd' Y -, : ' S: "]„w,. ]i ';:.:..
xrxxAlavSLippa�.QRenida'a.ga
112,M If T.H[S MAP M HOT TO el! UZED FOR 144VIGATIOM
2016 D. R. STRONG Consulting Engineers Inc. Page 21 The Pines
Level One Downstream Analysis Renton, Washington
FIGURE 14
CITY OF RENTON SEISMIC HAZARD AREAS MAP
Nous
, e&mc Ksays Arem Wap
[A]
12 4 25E 512 peer
*55_131J Vie4�Mer,:abr A�n1;:ny_Spt*m
City On
Financ[ & 11 Dir6iun
Site
Legend
Cn dnd Covrty Bou-dary
Ce
' cerr�r-eer
ParoeNs
Faufts
r seism Hazard Areas
Wknoo m Ted"w"-GIs = s_ : �•r G^^ry ��e:.v_,.---::-.�-e -aces; s:e me
4erAxNf�D'-><QpORQRI�'3'Y'r7.97v-_"• �"",-' v s :,r� er^� -r. area � r, : -�. -�: n tea, -x :<
3,21:2018 T?4� MAP * NOT TO BE LF.'ED FOR KAWGAT*N
X2016 D. R. STRONG Consulting Engineers Inc, Page 22 The Pines
Level One Downstream Analysis Renton, Washington
FIGURE 11
FEMA MAP
.*W PANG OW
ltANK us 1169111M mom
�FIRRMyyry�/,�,�i�y��1r� ee,, y��
8.{111 INSI INU ME W
KING COMM,
WASHMGMN AND
I[NCOP"RATED AREAS
IAM M W M5
44E — -N. roll -W 's —1 iw nN
Qt1filk-
n"M "OKM MNL 1L"
rY. fPd•
rl�•ry, Pp RM {Yw Ili •
Wp
53DUM F
MAF KIM
11111IT Is, T"
02096 D. R. STRONG Consulting Engineers Inc. Page 23 The Pines
Level One Downstream Analysis Renton, Washington
LEGEND
Lura IMttlR NNiarrwLn
®ncvi
R Ia..gM[ ROI9
ii1� • � W +.w �rrt
a• ! +r alp. w .
rLr Nr •hw. r ��
RamLr+r � ti xis .r
Rrm rw
OuLMi
r ►mow w
Y.n M IR•Y iY
OWPO Wb
IRS i
SIM
M1 • r �Y
02096 D. R. STRONG Consulting Engineers Inc. Page 23 The Pines
Level One Downstream Analysis Renton, Washington
9 0
FIGURE 12
KING COUNTY IMAP DRAINAGE COMPLAINTS MAP
Property Layers
Parcels
$tormwater Services
Drainage complaints
42016 D. R. STRONG Consulting Engineers Inc. Page 24 The Pines
Level One Downstream Analysis Renton, Washington
King County Nap
.NE::1Lb
-
Nt 1411 y
-, .. g -
16 -
i
E 1 i � 11 l .+ n i 1-� �, :.
_ - 1
__ __.�._
•..
Wim__ � -
NL "Lb t
NE nh M
t
NF MT1
.map xa.r��,.*-aat ar«r+r✓�i'..ci+•... •wa�%m..
osmtr..«'a`..c•x�ev .cx.�,a�.aeK a_«..
..z r�•rsaa~rr�i.. r.r«.
-.aa -x r..:.q ai. .-
N
I_.
kgK1.gCvsfty
e'.-or'«r.�..a..a�.��<•x«�r�«�,,.�.ex,���ra<e ar;«,t«a �.ao�
•�.v; b-r.yr-i«r:Y rtrr[-m'�ar�[o'r Ch. r.Y.k C'xq�rp�c-"4-b4
Jy
�,J�(�TPFJt
Pars 92:. 2�1[ Para.a Pamorara
Property Layers
Parcels
$tormwater Services
Drainage complaints
42016 D. R. STRONG Consulting Engineers Inc. Page 24 The Pines
Level One Downstream Analysis Renton, Washington
0 0
UPSTREAM TRIBUTARYAREA
Upon evaluation of the upstream area through examining COR topographic map (see
Figure 5) and by conducting field reconnaissance on March 21s' 2016, the upstream
tributary area for the Site is considered negligible. Runoff from the north and east is
captured by the developed single-family lots and conveyed to the existing conveyance
systems located in NE 91h St and Olympia Ave NE, respectively. Runoff from the south
is also collected by the developed single-family lots and conveyed to Monroe Ave NE
and south away from the Site.
GENERAL ONSITE AND OFFSITE DRAINAGE DESCRIPTIONS
The Site is contained within one Threshold Discharge Area (TDA). Runoff from the Site
sheet flows over the west property line to the vertical curb and gutter located on the east
side of Monroe Avenue NE. Runoff then flows north via curb and gutter before being
collected by one of two catch basins. Runoff from each catch basin is conveyed to the
24" diameter pipe and catch basin conveyance system within Monroe Avenue NE,
which flows south towards NE 7th St. The conveyance system then turns west at NE 7th
St. and continues to flow that direction for over a quarter -mile downstream of the Site.
©2016 D. R. STRONG consulting Engineers Inc. Page 25 The Pines
Level One Downstream Analysis Renton, Washington
9 •
TASK 4: DRAINAGE SYSTEM DESCRIPTION AND PROBLEM
DESCRIPTIONS
DRAINAGE SYSTEM DESCRIPTION
The downstream analysis is further illustrated and detailed in the Downstream Map
Figure 12 and Downstream Table Figure 13. The drainage area is located within the
East Lake Washington - Renton Drainage Basin. The drainage area was evaluated by
reviewing available resources described in task 2, and by conducting a field
reconnaissance on March 2151, 2016 under rainy conditions.
DOWNSTREAM PATH 1
"A1" is the Natural Discharge Area (NDA) for path 1 from the TDA of the Site. It is
located along the western property line (±0).
From Point "Al" to Point "B1", runoff continues to flow west as sheet flow over
approximately 7.5 feet of till grass and a 6 -inch concrete curb. No concentrated flow
was observed (±0'-8').
Point "Bl", runoff is collected by the concrete gutter located along the
east side of
Monroe Avenue NE (±8').
From Point "B1" to Point "Cl", runoff flows north as channel flow via vertical curb and
gutter. Light flow was observed (±8'-140').
Point "Cl", runoff enters a Type 1 CB, Facility ID No. 136224 (±140').
From Point "Cl" to Point "D1", runoff flows northwest as pipe flow via 8"
PVC. Trickle
flow was observed (±140'-154').
Point "D1", runoff enters a Type 2 CB, Facility ID No. 136225 (±154').
From Point "D1" to Point "E1", runoff flows west as pipe flow via 12"
CPEPILCPE.
Moderate flow observed (±154'-182').
Point "E1", runoff enters a Type 2 CB, Facility ID No. 135946 (±182').
From Point "E1" to Point "71", runoff flows south as pipe flow via 24"
CPEPILCPE.
Moderate flow was observed (±182'-403').
Point "F1", runoff enters a Type 2 CB, Facility ID No 135945 (±403').
From Point "F1" to Point "G1", runoff flows south as pipe flow via 24"
CPEPILCPE.
Moderate flow was observed (±403'-553').
Point "G1", runoff enters a Type 2 CB, Facility ID No 135942 (±553').
From Point "G1" to Point "H1", runoff flows south as pipe flow via 24"
CPEPILCPE.
Moderate flow was observed (±553'-695').
Point "H1", runoff enters a Type 2 CB, Facility ID No 136001 (±695').
From Point "H1" to Point "11", runoff flows south as pipe flow via 24"
CPEPILCPE.
Moderate flow was observed (±695'-824').
Point "ll", runoff enters a Type 2 CB, Facility ID No 135998 (±824').
02016 D. R. STRONG Consulting Engineers Inc. Page 26 The Pines
Level One Downstream Analysis Renton, Washington
9 0
From Point "11" to Point "J1", runoff flows south as pipe flow via 24" CPEP/LOPE.
Moderate flow was observed (±824'-958').
Point "J1", runoff enters a Type 2 CB, Facility ID No 135996 (±958').
From Point "J1" to Point "K1", runoff flows south as pipe flow via 24" CPEPILCPE.
Moderate flow was observed (±958'-1,093').
Point "K1", runoff enters a Type 2 CB, Facility ID No 135994. COR Maps incorrectly
identifies the structure as a type 1 (±1,093').
From Point "K1" to Point °L1", runoff flows southwest as pipe flow via 24" CPEPILCPE.
Moderate flow was observed (±1,093'-1,124').
Point "L1", runoff enters a Type 2 CB, Facility ID No 135993 (±1,124').
From Point "L1" to Point "M1", runoff flows westerly as pipe flow via 24"
CPEP.
Moderate flow was observed (±1,124'-1,238').
Point "M1", runoff enters a Type 2 CB, Facility ID No 134697 (±1,238').
From Point "M1" to Point "N1", runoff flows westerly as pipe flow via 24"
CPEP.
Moderate flow was observed (±1,238'-1,300').
Point "N1", runoff enters a Type 2 CB, Facility ID No 134696 (±1,300').
From Point "N1" to Point "01", runoff flows westerly as pipe flow via 24"
CPEP.
Moderate flow was observed (±1,300'-1,444').
Point "01 ", runoff enters a Type 2 CB, Facility ID No 134695 (±1,444').
From Point "01" to Point "P1", runoff flows southwesterly as pipe flow via 24"
CPEP.
Moderate flow was observed (±1,444'-1,562').
Point "P1", runoff enters a Type 2 CB, Facility ID No 134693 (±1,562').
From Point "P1" to Point "Q1", runoff flows southwesterly as pipe flow via 24"
CPEP.
Moderate flow was observed (±1,562'-1,625').
Point "Q1", runoff enters a Type 2 CB, Facility ID No 127707 located in the sidewalk
(±1,625').
From Point "W" to Point "R1", runoff flows southwest as pipe flow via 24"
CPEP.
Moderate flow was observed (±1,625'-1,678').
Point "R1", runoff enters a Type 2 CB, Facility ID No 134691 (±1,678').
From Point "R1" to Point °S1", runoff flows westerly as pipe flow via 24"
CPEP.
Moderate flow was observed (±1,678'-1,806').
Point "Sl", runoff enters a Type 2 CB, Facility ID No 134688. This concluded the
quarter -mile downstream reconnaissance (±1,806').
DOWNSTREAM PATH 2
"A2" is the Natural Discharge Area (NDA) for path 2 from the TDA of the Site. It is
located along the west property line of parcel 092305-9116 (±0').
©2016 D. R. STRONG Consulting Engineers Inc. Page 27 The Pines
Level One Downstream Analysis Renton, Washington
From Point "A2" to Point "1132", runoff continues to flow west as sheet flow over
approximately 7.5 feet of till grass and a 6 -inch concrete curb. No concentrated flow
was observed (±0'-8').
Point "1132", runoff is collected by the concrete gutter located along the east side of
Monroe Avenue NE (±8').
Point "1132" to Point °C2", runoff flows north as channel flow via vertical curb and gutter.
Light flow was observed (±8'-108').
Point "C2", runoff enters a Type 1 CB, Facility ID No. 135944 (±108').
From Point "C2" to Point "F1", runoff flows west as pipe flow via 8" PVC. Light flow was
observed (±108'-134').
Point "F1 ", runoff enters a Type 2 CB, Facility ID No. 135945 where runoff from
downstream path 2 converges with runoff downstream path 1 (±134').
©2016 D. R. STRONG Consulting Engineers Inc. Page 28 The Pines
Level One Downstream Analysis Renton, Washington
0
TASK 5: MITIGATION OF EXISTING OR POTENTIAL PROBLEMS
A review of the King County Water and Land Resources Division — Drainage Services
Section Documented Drainage Complaints within one mile of the downstream flow
paths revealed no complaints within the last ten years.
The project should not create any problems as specified in Section 1.2.2.1 of the
Manual and therefore is not required to provide Drainage Problem impact Mitigation
subject to the requirements of Section 1.2.2.2.
A wetvault will provide flow control and basic water quality requirements for the entire
Site. During construction, standard sediment and erosion control methods will be
utilized. This will include the use of a stabilized construction entrance, perimeter_ silt
fencing, and other necessary measures to minimize soil erosion during construction.
02016 D. R. STRONG Consulting Engineers Inc. Page 29 The Pines
Level one Downstream Analysis Renton, Washington
FIGURE 13
OFFSITE ANALYSIS DOWNSTREAM MAP
(b2016 D. R. STRONG Consulting Engineers Inc_ Page 30 The Pines
Leel One Downstream Analysis Renton, Washington
VE
fl 70 140 210 �__
1 INCH = 140 FT.
.Yaf�4�rnd4lpe.dwa 5/]9�"1iJ16 7.42-27 P mr�ew-- — — �v�v._ usaw,_ _
9 0
FIGURE 14
OFFSITE ANALYSIS DOWNSTREAM TABLE
DOWNSTREAM PATH 1
Symbol
Drainage
Component Type,
Name and Size
Drainage Component
Description
Slope
Dlstanoe
From site
Discharge
Existing
Problems
Potential
Problems
Observations of field inspector
resource reviewer, or resident
See map
Type: sheat flow, swale.
Stream, channel, pipe,
Pond; Size: diameter
Surface area
drainage basin, vegetation, cover,
depth, type of sensitive area, volume
%
1/4 mile =
1,320 feet
Constrictions, under capacity, ponding,
overtopping, flooding, habitat or
organism destruction, scouring, bank
sloughing, sedimentation. incision, other
erosion
Tri6u1 dY ansa, fikeihood of problem,
overflow pathways, potential Impacts.
Al
Natural discharge area
RunoFf exits at the NDA along the western
property line of the Site.
.*.0'
None Observed
None Anticipated
No concentrated flaw observed
Al -81
West sheet flow
Sheet flow over till grass and 6" curb
None Observed
None AMidpated
No concentrated flow observed
B1
6" Vertical curb and
gutter
East side of Monroe Avenue NE
f8'
None Observed
Nate Anticipated
Light flow, observed
131-G1
North channel flow
6" concrete vertical curb and gutter
None Observed
Noir Anticipated
Light flow observed
C1
Type 1 CS
Renton Facility No. 136224
3140'
None Observed
None Anticipated
Light flaw observed
C1-01
Northwest pipe flow
8-O PVC
None Observed
None Anticipated
Lightflow observed
D1
Type 2 CB
Renton Facility No. 136225
3154'
None Observed
Norio Anticipated
Light flow observed
D1 -E1
West pipe now
12" 0 CPEPILCPE
None Observed
None Arttiaipated
Moderate flow observed
El
Type 2 CB
Renton Facility No. 135976
1187
None Observed
None Anticipated
Moderate flaw observed
E1 -F1
South pipe flow
24"0 CPEPILCPE
None Observed
None Anticipated
Moderate flow observed
F1
Type 2 CB
ReMon Facility No, 135945
3403'
None Observed
None Anticipated
Moderate flow observed
F1-131
South pipe flow
24'0 CPEPILCPE
None Observed
None Anticipated
Moderate flow observed
02015 D. R. STRONG Consulting Engineers Inc. Page 31 The Pines
Level One Downstrearn Analysis Renton, Washington
11
0
G1
Type 2 CB
Renton Facility No. 135942
1553'
None Observed
None Antiripated
Moderate flow observed
G1-1-11
South pipe flow
24'0 CPEPlLCPE
None Observed
None Anticipated
Moderate flow observed
H1
Type 2 CB
Renton Facility No. 136001
*695,
None Observed
None Anticipated
Moderate flow observed
1-11-11
South pipe flow
24'0 CPEPlLCPE
None Observed
None Anticipated
Moderate flow observed
11
Type 2 CB
Renton Fatuity No. 135996
±624'
None Observed
None Anticipated
Moderate flow observed
11 -ii
South pipe now
24'0 CPEPlLCPE
None Observed
None Anticipated
Moderate flow observed
11
Type 2 CB
Renton Facility No. 135996
±9581
None Observed
None Anticipated
Moderate flow observed
J1 -K1
South pipe now
24'0 CPEPlLCPE
None Observed
None Anticipated
Moderate flow observed
Ki
Type 2 CB
Renton Facility No. 135994
11,093'
None Observed
None Anticipaled
Modarate flow observed
K1-1-1
Southwest pipe flow
24'0 CPEPILCPE
None Observed
Nate Anticipated
Moderate flow observed
L1
Type 2 CB
Renton Facility No 135993
t1, 124'
None Observed
None Anticipated
Moderate flow observed
L 1 -Mi
Westerly pipe now
24'0 CPEP
None Observed
None Anticipated
Moderate flow observed
Mi
Type 2 CB
Renton Facility No. 134697
11,236'
None Observed
None Anticdpated
Moderate flow observed
M1 -N1
Weatedy pipe now
24'0 CPEP
None Observed
None Anticipated
Moderate now observed
N1
Type 2 CB
Renton Facility No. 134696
±1,300'
None Observed
None Anticipated
Moderate now observed
N1-01
We_ body pipe How
24"0 CPEP
None Observed
None Anticipated
Moderate flow observed
01
Type 2 CB
Renton FacilityNo. 134695
±1,444'
None Observed
None Anticipated
Moderate flow observed
O1 -P1
Southwesterly pipe flaw
24'0 CPEP
None Observed
None AnticipatedModerate
flow observed
22016 D. R. STRONG Consulting Engineers Inc. Page 32 The Pines
Level One Downstream Analysis Renton, Washington
LJ
0
P1
Type 2 CB
Renton Facility No. 134693
Slope
t1,562
None Observed
None Anticipated
Moderate flow observed
P1-01
Southwesterly pipe flow
24.0 CPEP
From site
None Observed
None Anticipated
Moderate flow observed
01
Type 2 CB
Renton Facility No. 134692 located in the
sidewalk
:1.626
None Observed
None Anticipated
Moderale flow observed
01-R1
Southwesterly pipe flow
24' 0 CPEP
None Observed
None Anticipated
Moderate flow observed
Rt
Type 2 CB
Renton Facility No. 134691
174 ad -1,320
31,678'
None Observed
None Anticipated
Moderate flow observed
R1 -S1
Westerly pipe Raw
24" O CPEP
organism destnrctton, scouring, bank
None Observed
None Anticipated
Moderate flow observed
L
Type 2 CB
Renin Facility No. 134686_ This was the
end d the field reoonnaissanoe at over V.
rtrle downstream from the Site.
±1,806'
None Observed
None Anticipated
Moderate flow observed
DOWNSTREAM PATH 2
Symbol
Drainage
Drainage Component
Slope
Distance
Existing
Potential
Observations of field inspector
Component Type,
Description
From site
Problems
Problems
resouree reviewer, or resident
Name and Size
Dische e
Type sheet flow. swore,
Conshiotions, under capacity, ponding,
Tributary area, likelihood of pmUern,
See trap
Shawn, channel, pipe,
drainage basin, vegetation, carer,
%
174 ad -1,320
overt kipping, ftWing, habitat or
overRow pall1tways, pctentiat knpaels.
Pond: Slag: diameter
depth. type of sensitive area. wdurne
ft
organism destnrctton, scouring, bank
Surtaoe area
sloughing, sedimentation, incision, corer
erosion
Al
Natural discharge area
Runoff exits at NIDA along the western
±0'
None Observed
None Anticipated
No concentrated flow observed
fined rcei992305-116.
Al -81
West sheet flow
Sheet Row over till grass and 6" curb
None Observed
None Anticipated
No concentrated flow observed
B1
6' VeMcal curb and
East side of Monroe Avenue NE
±61
None Observed
None Anticipated
Light flaw observed
gutter
B1 -C1
Nath channel flow
6' concrata vertical curb and gutter
None Observed
None Anticipated
Light Row observed
C1
Type i CB
Renton Facility No. 135944
±108'
None Observed
None Anticipated
Light flaw observed
V2016 D, R- STRONG Consulting Engineers Inc. Page 33 The Pines
Level One Downstream Analysis Renton, Washington
C1 -F1
West pipe now
8"0 PVC
None Observed
None Anticipated
Light flow observed
F1
Type 2 CB
Renton Facility No, 135945, Downstream
path 2 combine, with downstream path.
+134'
None Observed
None Anticipated
No concentrated flaw observed
(02016 D. R. STRONG Consulting Engineers Inc. Page 34 The Pines
Leval One Downstream Analysis Renton, Washington
9 s
SECTION IV
FLOW CONTROL ANALYSIS AND WATER QUALITY DESIGN
EXISTING SITE HYDROLOGY
KCRTS was used to model runoff from the Site. The Site falls within the Peak Rate
Flow Control Stadard area matching existing Site conditions. The Site was modeled
with existing forested, pasture and impervious surfaces (see figure 15). Results of the
KCRTS analysis are included in this section.
Modeling Input for the TDA
0 Land Uw Summary
outwash Pasture; 0.00 acres.
Outwash Grass 0.00 acres;
Wetland' 0.00 acres
Impervious' 0.09 arres
Total
2.51 acres!
Scale Factor: 1.00 Hourly Reduced
Time Series: JPREDFV )�
Compute Time Series I
Modify User Input
File for computed Time Series [.TSFI
Pre -Developed KCRTS Modeling Input
Modeling Results
Flow Frequency Analysis
Time Series File:predev.tsf
Project Location:Sea-Tac
---Annual
Area
Till Forest
0.46 acres'
Till Pasture
1.97 acres
Till Grassi
0.00 acres
Outwash Forest
0.00 acres:
outwash Pasture; 0.00 acres.
Outwash Grass 0.00 acres;
Wetland' 0.00 acres
Impervious' 0.09 arres
Total
2.51 acres!
Scale Factor: 1.00 Hourly Reduced
Time Series: JPREDFV )�
Compute Time Series I
Modify User Input
File for computed Time Series [.TSFI
Pre -Developed KCRTS Modeling Input
Modeling Results
Flow Frequency Analysis
Time Series File:predev.tsf
Project Location:Sea-Tac
---Annual
Peak
Flow Rates---
-----Flow
Frequency
Analysis -------
Flow Rate
Rank
Time of
Peak
- - Peaks
- - Rank
Return
Prob
(CFS)
(CFS)
Period
0.181
2
2/09/01
18:00
0.310
1
100.00
0.990
0.077
7
1/05/02
16:00
0.181
2
25.00
0.960
0.170
3
2/28/03
3:00
0.170
3
10.00
0.900
0.030
8
8/26/04
2:00
0.160
4
5.00
0.800
0.097
6
1/05/05
8:00
0.153
5
3.00
0.667
0.160
4
1/18/06
16:00
0.097
6
2.00
0.500
0.153
5
11/24/06
4:00
0.077
7
1.30
0.231
0.310
1
1/09/08
6:00
0.030
8
1.10
0.091
Computed Peaks
0.267
50.00
0.980
82016 D. R. STRONG Consulting Engineers inc, Page 35 The Pines
Technical Information Report Renton, Washinglon
9
FIGURE '15
PREDEVELOPED AREA MAP
©2016 D. R. STRONG Consulting Engineers Inc. Page 36 The Pines
Technical Information Report Renton, Washington
0
0
2 n,fL. gyp£ :n'
FAe£ REA I 1
AREA BREAKDOWN
TOTAL PP?VXC7 AREA 113.047 ST (2595 ACRES)
TOTAL S'T£ AREA: IP?,9f8 SF. (2479 ACRES)
NAY TARGET ROW IWEgVIXl;& 291- S.F. {O 067 ACRES)
KCR 1S INPUT
NLK'-EFFfCi!'T£iWilM IWS AREA (1.E., TOW w ER0005 AREA LESS EIA)
15 ASSUUEf Tp 4AVE 7NE SAVE H No—WCIC Re5RAY5E A5 Tl1E
iAHME0 ,,Y ..PrPKuOS AREA_ Fry! EXAUPI,E, FCi EXISTINC
RMDENRAL AREAS KiH POCYTA'S OR —W ' TO SPLASP FAVY iA^5
GP LAn'OSCAPINO, THE
NLN-£FFfCPA POR R'1N OF R4£ ROOF AREAS
6Mw p91 TR£A TE? A5 PASPURE FOR PREDE.11PPWN7 COoanp s AN'0
CRA 55 FCrR FtlS r-D£YE'L6PM£wT CONOrRONS.
S' E.
FORE57G0' iP, 463 SF (11.156 ALR£5)
PAST FF 85']3 SF (i. 909 Al,EAS'WO PASTURE AREA 725)'9 S.F. (1.666 AE F S)
NAY-EFF<CRV£!M✓£NOWS' SURFACES 1.3,194 SF (0 JL13 ACRES)
WPERNOUS- 3,6F7 SF (0.065 ACRES)
EFFEC'y£ imPEFN0U5 SURFACE 778 S.F. (00TH 4CR£5)
UF57REAU TPI uwr AREA „a+4 SF (11067 ACRES)
LEGEND
- - - - - - - 11 1111ARY
PROrC16WNOARr
�'..'.
-5111 PASNRf AREA
7 111 SF (1,666 ACkfS)
®J
f"SuNr jwPr NNIS s Fac
I'.w
, 977 SrSF (G. S7! ACFEE)
nL
0.�4a4�LL}4
N(N-£f1fCRlE
iJ.]91 SF (0303 ACRES)
,
EFFEC;7
?78 SF (0.018 ACRES)
' x
E,Y1571n'c raREST
14.86.! S.F. (R+5E ACF.£5J
_.-•.�
NPV TARG[T ROW MPERNpJS
-P.- 5F, rC 067 ACRS"
TREE WTENTIOn' INA[,' A
3.719 5 F_ (O 0195 ACRES)
VyWNX�ys�lN�RBEC AREA
O'7'7E0 F UW DRARlAGF CALCS
NORTH
16007+SSOro.�A 5l
P'oislF; res SPREpE4: dr ./19/7P16 7. 14,55 PM
AO's' IS
DEVELOPED SITE HYDROLOGY
Soil Type
The soil types are unchanged from predeveloped conditions.
Land covers
KCRTS was used to model the developed peak runoff from the Site. The portions of the
Site within the developable area tributary to the proposed detention facility were
modeled as "Till Grass", and Impervious as appropriate. Results of the KCRTS analysis
are included in this section.
Modeling Input for DEV Site of the TDA
0 Land Use Summary
Area
Till Forest 0.00 8CMW.
Till Pasture' 0.00 acres:!
Till Grass0.94 acres;
Outwash Forest 0.00 aaese
Outwash Pasture] 0.00 acres!
3
OuMash Grass! 0.00 acres]
Wetland' 0.00 acres!
23
Impervious. 1.55 acres:
Total
2.49 acres!
Scale Factor, 1.00 Houry Reduced
Time Series: DELI >)
Compute Time Series
Modfly User Input I
File for computed Time Series J.TSFJ
Developed KCRTS Modeling Input
Modeling Results
Flow Frequency Analysis
Time Series File:dev.tsf
Project Location:Sea-Tac
---Annual
Peak
Flow Rates---
-----Flow
Frequency
Analysis -------
Flow Rate
Rank
Time of
Peak
- - Peaks
- - Rank
Return
Prob
(CFS)
(CFS)
Period
0.459
6
2/09/01
2:00
0.930
1
100.00
0.990
0,373
8
1/05/02
16:00
0.586
2
25.00
0.960
0.552
3
2/27/03
7:00
0.552
3
10.00
0.900
0.403
7
8/26/04
2:00
0.487
4
5.00
0.800
0.485
5
10/28/04
16:00
0.485
5
3.00
0.667
0.487
4
1/18/06
16:00
0.459
6
2.00
0.500
0.586
2
10/26/06
0:00
0.403
7
1.30
0.231
0.930
1
1/09/08
6:00
0,373
8
1.10
0.091
Computed Peaks
0.815
50.00
0.980
P2016 D. R. STRONG Consulting Engineers
Inc.
Page 37
The Pines
Technical Information Report
Renton, Washington
i 10
Modeling Input for the Bypass of the TDA
0 Land use Sumnnar} —
Area ?I
Till Forest 0.130 acres
Till Paslure 0.00 acres
Till Grass 0.01 acres
Outwash Forest 0.00 aces
Outwash Pasture 0.00 ages
Outwash Grass 0.00 acres
Welland 0.00 aces
Impervious 0.01 acres
Total
0.02 acres
Scale Factor : 1.00 Hourly Reduced
Time Series: JBYPASS »
Compute Time Series
Modify User Input l
File for computed Time Series I.TSF]
Developed KCRTS Modeling Input
Modeling Results
Flow Frequency Analysis
Time Series File:bypass.tsf
Project Location:Sea-Tac
_---Annual
Peak
Flow Rates ---
Flow Rate
Rank
Time of
Peak
(CFS)
(CFS)
Period
0.004
4
2/09/01
2:00
0.003
7
1/05/02
16:00
0.005
2
2/27/03
7:00
0.003
8
8/26/04
2:00
0.004
5
10/28/04
16:00
0.004
6
1/18/06
16:00
0.004
3
10/26/06
0:00
0.008
1
1/09/08
6:00
Computed Peaks
0.007
-----Flow
Frequency
Analysis-------
- - Peaks
- - Rank
Return
Prob
(CFS)
Period
0.008
1
100.00
0.990
0.005
2
25.00
0.960
0.004
3
10.00
0.900
0.004
4
5.00
0.600
0.004
5
3.00
0.667
0.004
6
2.00
0.500
0.003
7
1.30
0.231
0.003
8
1.10
0.091
0.007
50.00
0.980
02016 D. R. STRONG Consulting Engineers Inc. Page 38 The Pines
Technical Information Report Renton, Washington
0
FIGURE 16
DEVELOPED AREA MAP
02016 D. R. STRONG Consulting Engineers Inc. Page 39 The Pines
Technical Information Report Renton, Washington
0
B1P/, i$ AREA /770,' ['�Y.LEC7E01: 951 SF /d 022 AC)
IU-TRNp)5 501 S F, (0.017 AC )
R 1-1
KCRTSUT
AREA BREAKDOWN
ffL IN,
IM TRNOUS-
6/,340 S.F. (1546 A;,
mrAL PROJECT AREA:
7;3,G47 SF (2 5.q5 ACRES,
WPCPNWS ROA AREA
107A, 91C AREA_
107,969 SF. (7.479 ACRES)
CPi AR A;
70.474 SF, (1.616 ACJ
,V,W rAR^..ti R,O. N. 1MPERNJUS
,.PERw1xs.
3E'. 700 5r (0.689 ACJ
41.037 SF, (0 942 ACJ
71f. GRASS'
Jf,?oA SF (0.7:6 A!'.1
TL1 ;BASS PCW AREA
R— ARIA
28, 2.715E (0.648 ALJ
WPEPNOUS
22,557 5,F. 16.578 AC)
BYPASS,
7MP[R NWS:
TIiL CRASS
5.57+ SF 10, IJP ACJ
450 5F (0 010 AO)
1.RFF RFiFN1ICW. 7RAC7 A-
3.719 5F (0.095 AC)
JNO1571/RyEd AREA
00, r FROM ORA'NAGC CALLS
sTaeM 17RAfVAGE. ]PACT d:
5,277 5F. iO 120 Art
®
rMPER1AO✓S
r 509 5 F (0.000 ACJ
mL GFAss
,.608 S)l. (0.060 AC)
NLiY IRACFI k U W IMPJ.RVIOLIS-
:, 9!A SF. (0.067 AC)
[[--^^
I'.. ,mss
Illi ..�D�-p'''.
7RA C' 6 IMPEF.✓d,,5:
_160 S.r (001.1 ACJ
Q6
t_If ,5�ICCLliI�tut:'5.
1.020 S.F. ?0.02J aC)
B1P/, i$ AREA /770,' ['�Y.LEC7E01: 951 SF /d 022 AC)
IU-TRNp)5 501 S F, (0.017 AC )
R 1-1
KCRTSUT
ffL IN,
IM TRNOUS-
6/,340 S.F. (1546 A;,
iWEXPOUS �U! AREA
WPCPNWS ROA AREA
&PERV1{!ill_ Ir" ORA7NAGE, 7NACr G
lNPCRPOL!S SHAREG ORAYWAI, 7R'ACT E
,V,W rAR^..ti R,O. N. 1MPERNJUS
FIRvws
41.037 SF, (0 942 ACJ
rL4 CRASS LO'AREA
TL1 ;BASS PCW AREA
RLL CRASS S1LRN OFAWAGE, RAG7 P
7111 Wo.55 I ANOSCAPM16. 7RACiC
BYPASS,
7MP[R NWS:
507 SF (0..712 AL')
PERNAvS-
450 5F (0 010 AO)
h10R'TH � �W
6 fir
t11A.lt wr1 11 �
0 0
PERFORMANCE STANDARDS
The Site is required to adhere to Level 2 Flow Control Standards of the existing site
conditions (reference 11-A of COR 2009 Surface Water Design Manual Amendment). A
wet -vault will provide flow control and basic water quality treatment. The Project is
required to "match developed discharge durations to predeveloped durations for the
range of predeveloped discharge rates from 50% of the 2 -year peak flow up to the full
50 -year peak flow. Also match developed peak discharge rates to predeveloped peak
discharge rates for the 2- and 10 -year return periods. Assume existing site conditions
as the predeveloped condition" (2009 Surface Water Design Manual Amendment, Sec.
1.2.3.1).
D2016 D. R. STRONG Consulting Engineers Inc. Page 40 The Pines
Technical Information Report Renton, Washington
011 0
FLOW CONTROL SYSTEM
The Project will utilize an detention facility designed to control site runoff. The King
County Runoff Time Series (KCRTS) software was used to size the facility. The
detention pond design information is included in this section.
Retention/Detention Faeili7:V
Type of Facility
Facility Length:
Facility Width:
Facility Area:
Effective Storage Depth:
Stage 0 Elevation:
Storage Volume:
Riser Head:
Riser Diameter:
Number of orifices:
Detention Vault
56.06 ft
56.06 ft
3143. sq. ft
7.50 ft
383.00 ft
23570. cu. ft
7.50 ft
18.00 inches
3
The Pines
Renton, Washington
Full Head Pipe
Orifice
# Height
Diameter
Discharge
Diameter
(ft)
(in)
(CFS)
(in)
1
0.00
0.93
0.064
2
4.30
1.24
0.075
4.0
3
6.00
1.10
0.040
4.0
Top Notch Weir:
None
Outflow
Rating Curve:
None
Stage
Elevation
Storage
Discharge
Percolation
(ft)
(ft) (cu. ft) (ac -ft)
(cf5)
(cfs)
0.00
383.00
O.
0.000
0.000
0.00
0.01
383.01
31.
0.001
0.002
0.00
0.02
383.02
63.
0.001
0.003
0.00
0.03
383.03
94.
0.002
0.009
0.00
0.04
383.04
126.
0.003
0.005
0.00
0.05
383.05
157.
0.004
0.005
0.00
0.06
383.06
189.
0.004
0.006
0.00
0.07
383.07
220.
0.005
0.006
0.00
0.08
383.08
251.
0.006
0.006
0.00
0.22
383.22
691.
0.016
0.011
0.00
0.37
383.37
1163.
0.027
0.014
0.00
0.52
383.52
1634.
0.038
0.017
0.00
0.67
383.67
2106.
0.048
0.019
0.00
0.81
383.81
2546.
4.058
0.021
0.00
0.96
383.96
3017.
0.069
0.023
0.00
1.11
384.11
3488,
0.080
0.025
0.00
1.25
384.25
3928.
0.090
4.026
0.00
1.40
389.40
4400.
0.101
0.028
0.00
1.55
384.55
4871.
0.112
0.029
0.00
1.69
384.69
5311.
0.122
0.030
0.00
1.64
384.84
5783.
0.133
0.032
0.00
1.99
384.99
6254.
0.144
0.033
0.00
2.14
385.14
6725.
0.154
0.034
0.00
2.28
385.28
7165.
0.169
0.035
0.00
2.43
365.43
7637.
0.175
0.036
0.00
2.58
385.58
8108,
0.186
0.038
0.00
2.72
385.72
8548.
0.196
0.039
0.00
2.8`7
385.87
9020.
0.207
0.040
0.00
3.02
386.02
9491,
0.218
0.041
0.00
3.17
386.17
9962.
0.229
0.042
0.00
3.31
386.31
10402.
0.239
0.043
0.00
02016 D. R. STRONG Consulting Engineers Inc.
Page
41
Technical Information Report
The Pines
Renton, Washington
46
46
lu8?4.
25u
0.�4�
7
6
61
1 345.
260
0. 99
.00
1 785.
0.2,
0.95
OD
3.90
386.90
12257.
0.2B_
0.046
G.00
4.05
387.5
12728,
0.292
0.G4?
0.H
4.19
38:1..9
13168_
0.302
0.048
u.00
4.30
387.30
13514.
0.31:
0.048
O.H
4.31
387.31
13545.
0.311
0.049
0.00
4.33
387.33
13608.
0.312
0.050
0.00
4.34
387.34
13639.
0.313
0.051
0.00
4.35
387.35
13671.
0.314
0.054
0.00
4.36
387.;x6
13702.
0.315
0.057
0.00
4.38
387.38
13765.
0.316
0.060
0.00
4.39
387.39
13797.
0.317
0.061
0.Oa
4.40
387.40
13828,
0.317
0.062
0.00
4.42
387.42
13891.
0.319
0.063
0.00
4.56
387.56
14331.
0.329
0.071
0.00
4.71
387."11
14892.
0.340
0.077
0.00
4.86
387.86
15274.
0.351
0.083
0.00
5.00
388.00
15714.
0.361
0.087
0.00
5.15
388.15
16185.
0.3`72
0.092
0.00
5.30
388.30
16656.
0.382
0.095
0.00
5.45
388.45
1.7128.
0.393
0.099
0.00
5.59
388.59
17568.
0.403
0.103
0.00
5.74
388.74
18039.
0.414
0.106
0.00
5.89
388.89
18511.
0.425
0.109
0.00
6.00
389.00
18856.
0.433
0.112
0.00
6.01
389.01
18888.
0.434
0.112
0.00
6.02
389.02
18919.
0.434
0.113
0.00
6.03
389.03
18951.
0.435
0.115
0.00
15.05
389.05
19013.
0.436
0.116
0.00
6.06
389.06
19095.
0.437
0.119
0.00
15.97
389.07
19076.
0.438
0.122
0.00
6.08
389.08
19108.
0.439
9.123
0.00
6.09
389.09
19139.
0.439
0.123
0.00
6.24
389.24
19611.
0.450
0.132
0.00
6.39
389.39
20082.
0.461
0.140
0.00
6.53
389.53
20522.
0.471
0.146
0.00
6.68
389.68
20993.
0.982
0.152
0.00
6.83
389.83
21465.
0.493
0.157
0.00
6.97
389.97
21905.
0.503
0.162
0.00
7.12
390.12
22376.
0.514
0.167
0.00
7.27
390.27
22846.
0.525
0.172
0.00
7.42
390.92
23319.
0.535
0.176
0.00
7.50
390.50
23570.
0.541
0.179
0.00
7.60
390.60
23885.
0.548
0.644
0.00
7.70
390.70
24199.
0.556
1.490
0.00
7.80
390.80
24513.
0.563
2.590
0.00
7.90
390.90
24828.
0.570
3.890
0.90
8.00
391.00
25142.
0.577
5.360
0.00
8.10
391.10
25456.
0.564
6.799
0.00
8.20
391.20
25770.
0.592
7.320
o.a0
8.30
391.30
26085.
0.599
7.810
0.00
8.40
391.40
26399.
0.606
8.280
0.00
8.50
391.50
26713.
0.613
8.710
0.00
8.60
391.60
27027.
0.620
9.130
0.00
8.70
391.70
27342.
0.628
9.530
0.00
8.80
391.80
27656.
0.635
9.920
0.00
8.90
391.90
27970.
0.642
10.280
0.00
9.00
392.00
28285.
0.649
10.640
0.00
9.10
392.10
28599.
0.657
10.980
0.00
9.20
392.20
28913.
0.664
11.320
0.00
9.30
392.30
29227,
0.671
11.640
0.00
02016 D. R. STRONG
Consulting Engineers Inc.
Page 42
Technical Information Report
The Pines
Renton, Washington
0
'.}. v 392.40
}i "y'cl li:f 10:43 �'lltf1J4�'
1
0.93
0.78
2
C.46
„_19
3
0.46
0.15
4
0.49
0.11
5
0.55
C,.11
6
0.29
0.07
7
0.3`1
0.04
8
0.40
0.04
Hyd R/D Facility
Outflow
1 0.78
2 0.19
3 0.15
4 0.11
5 0.11
6 0.07
7 0.04
8 0.04
0
29'-42.
Inflow
().Cl
C)_00
Pe=k
0.18
atora0e
Stacie
E1ev
(Cu -Ft)
(Ac -Ft)
7.62
390.62
23936.
0.549
7.50
390.50
23578.
0•.541
6.71
389.71
21077.
0.484
5.92
388.92
18607.
0.427
5.83
388.83
18330_
0.421
4.55
387.55
14299.
0.328
3.67
386.67
11528.
0.265
2.87
385.67
9034,
0.207
Tributary Reservoir
Inflow
Inflow
().Cl
W WWkk WkW
0.79
0.18
0.00
***k****
0.00
*****+*+
0.00
Wkkkkkk+
0.00
WkkkWWkk
0.07
**W**YrW
0.00
*k*<****
----------------------------------
Route Time Series through Facility
Inflow Time Series File:dev.tsf
Outflow Time Series File:rdout
POC Time Series File:dsout
POC Outflow
Target
Calc
*Ww+k*+
0.79
0.18
0.19
*******
0.15
*******
0.11
***k+*k
0.11
IrWkkk**
0.07
**W**YrW
0.04
18:00
0.108
Inflow/Outflow Analysis
Peak Inflow Discharge: 0.930 CFS at
Peak Outflow Discharge: 0.779 CES at
Peak Reservoir Stage: 7.62 Ft
Peak Reservoir Elev: 390.62 Ft
Peak Reservoir Storage: 23936. Cu -Ft
0.549 Ac -Ft
Add Time Series:bypass.tsf
6:00 on Jan 9 in Year 8
9:00 on Jan 9 in Year 8
Peak Summed Discharge: 0.785 CES at 9:00 on Jan 9 in Year 8
Point of Compliance File:dsout.tsf
Flow Frequency Analysis
Time Series File:rdout.tsf
Project Location:Sea-Tac
---Annual Peak
Flow Rates ---
Flow Rate
Rank
Time of
Peak
(CFS)
0.190
2
2/09/01
20:00
0.044
7
12/28/01
18:00
0.108
5
3/06/03
22:00
0.040
8
8/26/04
7:00
0.070
6
1/05/05
16:00
0.110
4
1/18/06
23:00
0.153
3
11/24/06
7:00
0.779
1
1/09/08
9:00
Computed Peaks
Flow Frequency Analysis
Time Series
File:dsout.tsf
Project
Location:Sea-Tac
---Annual Peak Flow Rates ---
Flow Rate Rank Time of Peak
-----Flow Frequency Analysis-------
- - Peaks - - Rank Return Prob
(CFS) (ft) Period
0.779 7.62 1 100.00 0.990
0.190 7.50 2 25.00 0.960
0.153 6.71 3 10.00 0.900
0.110 5.92 4 5.00 0.800
0.108 5.83 5 3.00 0.667
0.070 4.55 6 2.00 0.500
0.044 3.67 7 1.30 0.231
0.040 2.87 8 1.10 0.091
0.583 7.59 50.00 0.980
-----Flow Frequency Analysis-------
- - Peaks - - Rank Return Prob
02016 D. R. STRONG Consulting Engineers Inc. Page 43 The Pines
Technical Information Report Renton, Washington
0 0
The Pines
Renton, Washington
Pcricd
0.191
2
21 9/07
20:00
0..65
7
100.00 C!.9S^5
_2/20/07
'7:00
0.191
20.960
O.7D9
5
3/06/03
22:00
0.379
3
l0.cc 0.900
0.0?0
8
&/26/04
4:00
0.110
4
5.00 0.819
071
6
7;"5/05
16:00
0.109
5
3.00 0.66+
0.110
4
1/18/0E
22:00
0.071
6
2.00 0.500
0.154
3
11/24/06
7:00
0.045
7
1.30 0.231
0.785
1
1/09/08
9:00
0.040
8
1.10 0.091
Computed
Peaks
0.587
50.00 0.990
Flow Duration
from Time
Series File:rdout.tsf
Cutoff
Count
Freauency CDP
Exceedence_Probability
CFS
-.
7b
9
0.003
36907
60.188
60.189
39.812
0.398E+00
0.008
5849
9.538
69.726
30.274
0.303E+00
0.013
4941
8.058
77.784
22.216
0.222E+00
D.019
97.47
6.763
84.547
15.453
0.155E+00
0.024
3386
5.522
90.068
9.932
0.993E-01
0.029
2465
4.020
94.088
5.912
0.591E-01
0.035
1399
2.281
96.370
3.630
0.363E-01
0.040
848
1.383
97.753
2,247
0.225E-01
0.045
723
1.179
98.932
1.068
0.107E-01
0.051
349
0.569
99.501
0.499
0.499E-02
0.056
16
0.026
99.527
0.473
0.473E-02
0.061
25
0.041
99.568
0,432
0,432E-02
0.067
34
0.055
99.623
0.377
0.377E-02
0.072
27
0.044
99.667
0.333
0.333E-02
0.077
19
0.031
99.698
0.302
0.302E-02
0.083
16
0.026
99.724
0.276
0.276E-02
0.088
18
0.029
99.754
0.246
0.246E-02
0.093
21
0.034
99.788
0.212
0,212E-02
0.099
23
0.038
99.826
0.174
0.174E-02
0.104
26
0.042
99.868
0.132
0.132E-02
0.109
30
0.049
99.917
0.083
0.832E--03
0.115
10
0.016
99.933
0.067
0,669E-03
0.120
1
0.002
99.935
0.065
0.652E-03
0.125
5
0.006
99.943
0.057
0.571E-03
0.131
4
0.007
99.949
0.051
0.506E-03
0.136
3
0.005
99.954
0.046
0.457E-03
0.141
3
0.005
99.959
0.041
0.408E-03
0.147
3
0.005
99.964
0.036
0.359E-03
0.152
5
0.008
99.972
0.028
0.277E-03
0.157
5
0.008
99.980
0.020
0.196E-03
0.163
2
0.003
99.984
0.016
0.163E-03
0.168
2
0.003
99.987
0.013
0.130E-03
0.173
3
0.005
99.992
0.008
0.815E-04
0.179
4
0.007
99.998
0.002
0.163E-04
0.184
0
0.000
99.998
0.002
0.163E-09
0.189
0
0.000
99.996
0.002
0.163E-04
Flow Duration from Time
Series File:dsout.tsf
Cutoff
Count
Frequency CDF
Exceedence_Probability
CFS
%
%
$
0.003
36925
60.217
60.217
39.783
0.398E+00
0.008
5859
9.555
69.772
30.228
0.302E+00
0.013
4974
8.112
77.883
22.117
0.221E+00
0.019
4001
6.525
84.408
15.592
0.156E+00
0.024
3417
5.572
89.980
10.020
0.100E+00
0.030
2495
4.069
94.049
5.951
0.595E-01
0.035
1411
2.341
96.350
3.650
0.365E-01
0.090
654
1.393
97.743
2.257
0.226E-01
0.046
717
1.169
98.912
1.088
0.109E-01
G{2016 D. R.
STRONG Consulting
Engineers
Inc.
Page 44
Technical Information Report
The Pines
Renton, Washington
0
0
0.0 5 O 99.9°3 5C 5ij7--:.2
0.05E 21 0.034 99.527 3 4%? 47.3,- 2
0.062 29 0.039 99.566 0.434 4.34:-;2
0.067 34 0.055 99.622 0.378 .378E-02
6.072 30 0.049 99.571 0 329 .,.329E -C2
0.078 15 0.Ci24 99.695 0.305 C.30oF--C2
0.083 19 0.031 99.726 0.274 CC' .274E-02
0.088 15 0.024 99.750 0.250 0.250E -C2
0.094 20 0.033 99.783 0.217 0.217E-02
0.099 25 0.041 99.824 0.176 0.176E-02
0.104 27 0.044 99.868 0.132 0.132E-02
0.110 28 0.046 99.914 O.H6 0.864E-03
0.115 12 0.020 99.933 0.067 0.669E-03
0.121 1 0.002 99.935 0.065 0.652E-03
0.126 4 0.007 99.941 0.059 0.587E-03
0.131 5 0.008 99.949 0.051 0.506E-03
0.137 2 0.003 99.953 0.047 0.473E-03
0.142 3 0.005 99.958 0.042 0.424E -C3
0.147 4 0.007 99.964 0.036 0.359E -C3
0.153 5 0.008 99.972 0.028 0.277E-03
0.158 5 0.008 99.980 0.020 0.196E-03
0.163 2 0.003 99.984 0.015 0.163E-03
0.169 1 0.002 99.985 4.015 0.147E-03
0.174 4 0.007 99.992 0.008 0.815E-04
0.179 3 0.005 99.997 0.003 0.326E-04
0.185 1 0.002 99.998 0.002 0.163E-04
0.190 0 0.000 99.998 0.002 0.163E-04
Duration Comparison Anaylsis
Base File: predev.tsf
New File: dsout.tsf
Cutoff Units: Discharge in CFS
-----Fraction of Time ----- ---------Check of Tolerance -------
Cutoff Base New °sChange Probability Base New %Change
0.048 0.77E-02 0.62E-02 -18.9 1 4.77E-02 0.048 0.048 -1.1
0.059 1 0.57E-02 0.46E-02 -18.7 1 0.57E-02 0.059 4.049 -16.6
0.059 1 0.45E-02 0.36E-02 -18.6 1 0.45E-02 0.069 4.060 -12.2
0.079 1 0.33E-02 0.30E-02 -9.0 1 C.33F-02 0.079 0.073 -7.2
0.089 1 0.25E-02 0.24E-02 -0.7 1 0.25E-02 0.089 0.089 -0.1
0.099 1 0.18E-02 0.18E-02 -1.8 1 0.18E-02 4.099 0.099 -0.4
0.109 I 0.13E-02 0.86E-03 -32.9 1 0.13E-02 0.109 0.105 -4.1
4.120 I 0.95E-03 0.65E-03 -31.0 1 0.95E-03 0.120 0.109 -8.9
0.130 1 0.65E-03 0.51E -D3 -22.5 0.65E-03 0.130 0.122 -6.1
0.140 1 0.46E-03 0.42E-03 -7.1 1 0.46E-03 0.140 0.139 -0.7
0.150 1 0.23E-03 0.31E-03 35.7 1 0.23E-03 0.150 0.155 3.0
0.160 1 0.16E-03 0.20E-03 20.0 1 0.16E-03 0.160 0.165 3.0
0.170 1 0.49E-04 0.11E-03 133.3 1 0.49E-04 0.170 0.178 4.5
0.181 1 0.16E-04 0.16E-04 0.0 1 0.16E-04 0.181 0.191 5.8
Maximum positive excursion = 0.010 cfs ( 6.7%)
occurring at 0.153 cfs on the Base Data:predev.tsf
and at 0.163 cfs on the New Data:dsout.tsf
Maximum negative excursion = 0.013 cfs (-19.9)
occurring at 0.063 cfs on the Base Data:predev.tsf
and at 0.050 cfs on the New Data:dsout.tsf
02016 D. R. STRONG Consulting Engineers Inc. Page 45 The Pines
Technical Information Report Renton, Washington
0 0
Flow Frequency
Return Pe rix
2 5 10 20 It 100
1 2 5 10 20 30 40 50 60 70 80 90 95 96 99
Ct1nW O-00 Plobablmy I
Duration Analysis
0
w
0
c
l in n1
LL
iU c
i m
ado n d ,r
dsou[ Dur
1 k3.CEi d,
00o N•q
b
00
L`
o ti
10 s 10,
1v - 10
PlobebWy FXCP6d@MQ
100
Q2016 Q. R- STRONG Consulting Engineers Inc. Page 46 The Pines
Technical Information Report Renton, Washington
WATER QUALITY TREATMENT SYSTEM
The Project is required to adhere to the City of Renton's Basic Water Quality treatment
criteria. A combined detention/water quality vault located within Tract D is proposed to
accommodate this requirement.
Preliminary sizing for a wetvault was calculated from the formula provided by Section
6.4.1.1 Methods of Analysis of the Manual. The minimum wetpool volume required is
8,327 cubic feet. The Project will provide 15,785 cubic feet of dead storage.
t2016 D. R. STRONG Consulting Engineers Inc. Page 47 The Pines
Technical Information Report Renton, Washington
0
11
FIGURE 17
DETENTION & WATER QUALITY FACILITY DETAILS
(To be completed at time of final engineering)
02016 D. R. STRONG Consulting Engineers Inc. Page 48 The Pines
Technical Information Report Renton, Washington
11
SECTION V
CONVEYANCE SYSTEM ANALYSIS AND DESIGN
Per Core Requirement #4 of the KCSW DM, the conveyance system must be analyzed
and designed for the existing tributary and developed onsite runoff. Pipe systems shall
be designed to convey the 100 -year design storm. The Rational Method will be used to
calculate the Q -Ratio for each pipe node.
A conveyance system consisting primarily of pipes and catch basins will be designed for
the Project. Onsite runoff will be collected by the multiple catch basins. Pipes are
typically eight -inch to twelve -inch diameter LCPE material.
A backwater analysis will be provided at time of final engineering.
©2016 D. R. STRONG Consulting Engineers Inc. Page 49 The Pines
Technical Information Report Renton, Washington
SECTION VI
SPECIAL REPORTS AND STUDIES
The following report and studies have been provided with this submittal.
Wetland Memo: Re -Align Environmental — April 215t, 2016
Geotechnical Engineering Study: Earth Solutions NW, LLC —April 27, 2016
Traffic Memorandum: Gibson Traffic Consultants, Inc. — May 9, 2016
Arborist Report: Creative Landscape Solutions — July 17, 2016
0=16 D. R. STRONG Consulting Engineers Inc. Page 50 The Pines
Technical Information Report Renton, Washington
0 0
SECTION VII
OTHER PERMITS, VARIANCES AND ADJUSTMENTS
• Hammerhead turnaround approval at the end of internal Road A, by Carey
Thomas, dated April 6, 2016.
D2016 D. R. STRONG Consulting Engineers Inc. Page 51 The Pines
Technical Information Report Renton, Washington
SECTION VIII
CSWPPP ANALYSIS AND DESIGN (PART A)
The Erosion and Sedimentation Control Design will meet the seven minimum King
County requirements:
1. Areas to remain undisturbed shall be delineated with a high visibility plastic fence
prior to any site clearing or grading.
2. Site disturbed areas shall be covered with mulch and seeded, as appropriate, for
temporary or permanent measures.
3. Perimeter protection shall consist of a silt fence down slope of any disturbed areas
or stockpiles.
4. A stabilized construction entrance will be located at the point of ingresslegress (i.e.
onsite access road).
5. The detention pond will act as a sediment pond for sediment retention. Perimeter
silt fences will provide sediment retention within the bypass areas.
6. Surface water from disturbed areas will sheet flow to the sediment pond for
treatment.
7. Dust control shall be provided by spraying exposed soils with water until wet. This is
required when exposed soils are dry to the point that wind transport is possible
which would impact roadways, drainage ways, surface waters, or neighboring
residences.
SWPPP PLAN DESIGN (PART B)
Construction activities that could contribute pollutants to surface and storm water
include the following, with applicable BMP's listed for each item:
1. Storage and use of chemicals: Utilize source control, and soil erosion and
sedimentation control practices, such as using only recommended amounts of
chemical materials applied in the proper manner; neutralizing concrete wash
water, and disposing of excess concrete material only in areas prepared for
concrete placement, or return to batch plant; disposing of wash-up waters from
water-based paints in sanitary sewer; disposing of wastes from oil-based paints,
solvents, thinners, and mineral spirits only through a licensed waste
management firm, or treatment, storage, and disposal (TSD) facility.
2. Material delivery and storage: Locate temporary storage areas away from
vehicular traffic, near the construction entrance, and away from storm drains.
Material Safety Data Sheets (MSDS) should be supplied for all materials stored,
and chemicals kept in their original labeled containers. Maintenance, fueling,
and repair of heavy equipment and vehicles shall be conducted using spill
prevention and control measures. Contaminated surfaces shall be cleaned
immediately following any spill incident. Provide cover, containment, and
protection from vandalism for all chemicals, liquid products, petroleum products,
and other potentially hazardous materials.
02016 D. R. STRONG Consulting Engineers Inc. Page 52 The Pines
Technical Information Report Renton, Washington
0 0
3. Building demolition: Protect stormwater drainage system from sediment -laden
runoff and loose particles. To the extent possible, use dikes, berms, or other
methods to protect overland discharge paths from runoff. Street gutter,
sidewalks, driveways, and other paved surfaces in the immediate area of
demolition must be swept daily to collect and properly dispose of loose debris
and garbage. Spray the minimum amount of water to help control windblown fine
particles such as concrete, dust, and paint chips. Avoid excessive spraying so
that runoff from the site does not occur, yet dust control is achieved. Oils must
never be used for dust control.
4. Sawcutting: Slurry and cuttings shall be vacuumed during the activity to prevent
migration offsite and must not remain on permanent concrete or asphalt paving
overnight. Collected slurry and cuttings shall be disposed of in a manner that
does not violate ground water or surface water quality standards.
The complete CSWPPP will be completed and submitted at time of final of engineering
02016 D. R. STRONG Consulting Engineers Inc. Page 53 The Pines
Technical information Report Renton, Washington
SECTION IX
BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT
1. Bond Quantity Worksheet —will be submitted at final engineering
2. The Stormwater Facility Summary Sheet is included in this section
U016 D. R. STRONG Consulting Engineers Inc. Page 54 The Pines
Technical Information Report Renton, Washington
STORMWATER FACILITY SUMMARY SHEET
Development The Pines Date July 19 2016
Location: 850 & 870 Monroe Ave NE, Renton, Washington 98056
ENGINEER
DEVELOPER
Name
Yoshio L Piediscalzi, P.E.
Name Jamie Waltier
Firm
D. R. STRONG Consulting
Engineers, Inc.
Firm Harbour Homes, LLC
Address
620 7 Avenue
Address 400 North 3e St, Suite 300
Kirkland, WA 98033
Seattle, WA 98103
Phone
(425) 8273063
Phone (206) 315-8130
Developed Site: 2.509 acres
Number of lots: 14
Number of detention facilities on site: Number of infiltration facilities on site:
1 vaults vaults
pond ponds
tanks tanks
Flow control provided in regional facility (give location)
No flow control required Exemption number
uownstream uraina a tsasins
Immediate Major Basin
Basin Renton East Lake Washington
Number & type of water quality facilities on site:
biofiltration swale (regular/wet/ or continuous inflow?)
sand filter (basic or large?) sand filter, linear (basic or
large?) CONTECH Stormfilter
1 combined detentionJWQ vault sand filter vault (basic or large?)
combined detentionlwetpond stormwater wetland
compost filter wetvault (basic or large?)
filter strip Wetvault
flow dispersion pre -settling pond
farm management plan flow -splitter catchbasin
landscape management plan
oil/water separator (baffle or coalescing plate?)
catch basin inserts:
Manufacturer
pre -settling structure:
Manufacturer
Cc2DI8 17. R. STRONG Consulting Engineers Inc. Page 55 The Pines
Technical Information Report Renton, Washington
0 0
DESIGN INFORMATION
INDIVIDUAL BASIN
Water Quality design flow
Water Quality treated volume
-Drainage basins
1
Onsite area includes frontage)
2.4424
Offsite area
0.0668
Type of Storage Facility
Detention
Vault
Live Storage Volume (required)
23,570
Predev Runoff Rate 2 -year
0.097
10- ear
0.170
1 00 - ear
0.310
-Developed Runoff Rate 2 -year
0.071
includes bypass) 10 -year
0.154
1 00 - ear
0.785
Type of Restrictor
Size of orifice/restriction
No. 1
0.93" 0
0.00'
No. 2
1.24" 0
4.30'
No. 3
1.10" 0
6.00'
©2016 Q. R. STRONG Consulting Engineers Inc. Page 56 The Pines
Technical Information Report Renton, Washington
•
SECTION X
OPERATIONS AND MAINTENANCE MANUAL
Excerpts from the 2009 KCSW DM will be provided at final engineering.
©2016 D. R. STRONG Consulting Engineers Inc. Page 57 The Pines
Technical Information Report Renton, Washington
0
APPENDICES
©2096 D. R. STRONG Consulting Engineers Inc. Page 58 The Pines
Technical Information Report Renton, Washington
APPENDIX "A" LEGAL DESCRIPTION
THE SOUTH 2 ACRES OF THE NORTH 4 ACRES OF THE SOUTHWEST QUARTER
OF THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER OF SECTION 9,
TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M., IN KING COUNTY, WASHINGTON;
EXCEPT THE EAST 130 FEET THEREOF; AND EXCEPT THE WEST 30 FEET FOR
MONROE AVENUE N.E.; ALSO
THE NORTH 2 ACRES OF THE SOUTHWEST QUARTER OF THE SOUTHWEST
QUARTER OF THE NORTHEAST QUARTER OF SECTION 9, TOWNSHIP 23
NORTH, RANGE 5 EAST, W.M., IN KING COUNTY, WASHINGTON; EXCEPT THE
WEST 30 FEET FOR COUNTY ROAD; EXCEPT THE EAST 130 FEET THEREOF;
AND EXCEPT THE NORTH 48 FEET.
072016 D, R. STRONG Consulting Engineers Inc_ Page 59 The Pines
Technical Information Report Renton, Washington
9 0
DRS Project No. 16007
CITY OF RENTON
ENVIRONMENTAL CHECKLIST
THE PINES
PURPOSE OF CHECKLIST:
Governmental agencies use this checklist to help determine whether the environmental
impacts of your proposal are significant. This information is also helpful to determine if
available avoidance, minimization or compensatory mitigation measures will address
the probable significant impacts or if an environmental impact statement will be
prepared to further analyze the proposal.
INSTRUCTIONS FOR APPLICANTS:
This environmental checklist asks you to describe some basic information about your
proposal. Please answer each question accurately and carefully, to the best of your
knowledge. You may need to consult with an agency specialist or private consultant for
some questions. You may use "not applicable" or "does not apply" only when you can
explain why it does not apply and not when the answer is unknown. You may also
attach or incorporate by reference additional studies reports. Complete and accurate
answers to these questions often avoid delays with the SEPA process as well as later in
the decision-making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them
over a period of time or on different parcels of land. Attach any additional information
that will help describe your proposal or its environmental effects. The agency to which
you submit this checklist may ask you to explain your answers or provide additional
information reasonably related to determining if there may be significant adverse
impact.
® 2416 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 1 of 24 Renton, Washington
A.
0
BACKGROUND
Name of proposed project, if applicable:
The Pines
2. Name of applicant:
Harbour Homes, LLC
0
3. Address and phone number of applicant and contact person:
Applicant:
Jamie Waltier
400 North 34th Street, Suite 300
Seattle, WA 98103
(206) 315-8130
Contact Person:
Yoshio L. Piediscalzi, P.E.
D. R. STRONG Consulting Engineers Inc.
620 7th Avenue
Kirkland, WA 98033
425 827-3063
4. Date checklist prepared:
July 19, 2015
5. Agency requesting checklist:
City of Renton
6. Proposed timing or schedule (including
phasing, if applicable):
Construction will start upon the receipt of
all required building and construction
permits. This is estimated to occur in the
Fall, 2017.
7. Do you have any pians for future additions,
expansion, or further activity related to or
connected with this Proposal? If yes, explain.
Construct 14 single-family residences.
0 2416 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 2 of 24 Renton, Washington
0 9
8. List any environmental information you know
about that has been prepared, or will be
prepared, directly related to this Proposal.
Arborist Report: Creative Landscape Solutions
Geotechnical Report: Earth Solutions NW
Wetland Evaluation: Re -Align Environmental
Level One Downstream Analysis: D. R. STRONG Consulting
Engineers Inc.
Traffic Memorandum: Gibson Traffic Consultants, Inc.
9. Do you know whether applications are pending
for governmental approvals of other proposals
directly affecting the property covered by your
Proposal? If yes, explain.
None to our knowledge.
10. List any government approvals or permits that
Will be needed for your Proposal, if known.
SEPA Determination City of Renton
Preliminary Subdivision Approval City of Renton
Grading Permit City of Renton
Final Subdivision Approval City of Renton
Building Permit City of Renton
Other Customary Construction Related Permits
City of Renton
Construction General Stormwater Permit
Department of Ecology
Forest Practice Permit Department of Natural
Resources
11. Give brief, complete description of your
Proposal, including the proposed uses and the
size of the project and site. There are several
questions later in this checklist that ask you to
describe certain aspects of your Proposal. You
do not need to repeat those answers on this
page. (Lead agencies may modify this form to
include additional specific information on
project description.).
Subdivide approximately 2.48 acres into 14
single-family residential lots, one internal
local access street with hammerhead
turnaround, and one drainage tract. Access
to the subdivision will be from Monroe
Avenue NE.
@ 2016 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA checklist Page 3 or 24 Renton, Washington
0 0
12. Location of the Proposal. Give sufficient
information for a person to understand the
precise location of your proposed project,
including a street address, if any, and section,
township, and range, if known. If a Proposal
would occur over a range of area, provide the
range or boundaries of the site(s). Provide a
legal description, site plan, vicinity map, and
topographic map, if reasonably available.
While you should submit any plans required by
the agency, you are not required to duplicate
maps or detailed plans submitted with any
permit applications related to this checklist.
The Project is located in the SW 1/4 of
Section 09, Township 23 North, Range 5
East. The Site is located at 850 & 870
Monroe Avenue NE, Renton, Washington.
4 2016 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 4 of 24 Renton, Washington
B. ENVIRONMENTAL ELEMENTS
EARTH
a. General -description of the site (circle
one . Flat,)oIling, steep slopes,
mown alnous other.
In general, the majority of the
property has slopes of less than 15%.
The Site slopes west towards Monroe
Avenue NE. A high point is located
at the eastern property line.
b. What is the steepest slope on the site
(approximate percent slope)?
There are two isolated areas where
the slope is approximately 15% over
a span of 15-20 ft. One is located
along the northern property line and
the other is located along the
southern property line.
C. What general types of soils are found on
the site (for example, clay, sand, gravel,
peat, muck)? If you Know the classifi-
cation of agricultural soils, specify them
and note any prime farmland.
The soils on the Site are mapped in
the Soil Survey of King County,
Washington, prepared by the U.S.
Department of Agriculture, Soil
Conservation Service and has
classified the Site as Arents,
Alderwood material, slopes 6-15%
(AmC). Additionally, see attached
Geotechnical Report dated April 27,
2016.
d. Are there surface indications or history
of unstable soils in the immediate
vicinity? If so, describe.
Per the City of Renton's Landslide
Hazard Areas Map, a portion of land
located towards the center of the Site
is considered to be a moderate
landslide hazard. Topography and
® 2016 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 5 of 24 Renton, Washington
the geotechnical report suggest the
potential for a landslide should be
characterized as very low.
e. Describe the purpose, type, and
approximate quantities and total
affected area of any filling or grading
proposed. Indicate source of fill.
The purpose of the site grading will
be to construct the utilities, local
access streets, finished grade pad
elevations and drainage tract.
Approximately 1,226 c.y. of cut and
2,207 c.y. of fill is computed for the
Project. The net volume is
approximately 981 c.y. off ill.
f. Could erosion occur as a result of
clearing, construction, or use? If so,
generally describe.
There could be a short-term increase
in the potential for on-site erosion
where soils are exposed during site
preparation and construction;
however, the Project will comply with
all applicable erosion control
measures, short term and long term.
g. About what percent of the site will be
covered with impervious surfaces after
project construction (for example,
asphalt or buildings)?
Approximately 60% of the Site will be
covered by impervious surfaces.
h. Proposed measures to reduce or control
erosion, or other impacts to the earth, if
any.
A temporary erosion control plan will
be implemented at the appropriate
time. Erosion control measures may
include the following: hay bales,
siltation fences, temporary siltation
ponds, controlled surface grading,
stabilized construction entrance, and
other measures, which may be used
2016 C. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 6 of 24 Renton, Washington
0
0
in accordance with requirements of
the City of Renton.
2. AIR
a. What types of emissions to the air would
result from the Proposal during con-
struction, operation and maintenance
when the project is completed? (i.e.,
dust, automobile odors, industrial wood
smoke.) If any, generally describe and
give approximate quantities if known.
Short-term emissions will be typical
of those associated with construction
and site development activities.
These may include dust and
emissions from construction
equipment. Long-term impacts will
result from increased vehicle traffic.
b. Are there any off-site sources of
emissions or odor that may affect your
Proposal? If so, generally describe.
Off-site sources of emissions or
odors are those that are typical of
residential neighborhoods. These
will include automobile emissions
from traffic on adjacent roadways
and fireplace emissions from nearby
homes.
C. Proposed measures to reduce or control
emissions or other impacts to air, if any.
The Washington Clean Air Act
requires the use of all known,
available, and reasonable means of
controlling air pollution, including
dust. Construction impacts will not
be significant and could be
controlled by measures such as
washing truck wheels before exiting
the site and maintaining gravel
construction entrances. In addition,
dirt -driving surfaces will be watered
during extended dry periods to
control dust.
@ 2016 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 7 of 24 Renton, Washington
3. WATER
a. Surface.
i. Is there any surface water body
on or in the immediate vicinity of
the site (including year-round and
seasonal streams, saltwater,
lakes, ponds, wetlands)? If yes,
describe type and provide
names. If appropriate, state what
stream or river it flows into.
None.
ii. Will the project require any work
over, in, or adjacent to (within
200 feet) the described waters?
No, there will not be work
within or adjacent to any
surface water body.
iii. Estimate the amount of fill and
dredge material that would be
placed in or removed from sur-
face water or wetlands and
indicate the area of the site that
would be affected. Indicate the
source of fill material.
None.
iv. Will the Proposal require surface
water withdrawals or diversions?
Give general description,
purpose, and approximate
quantities if known.
No, there will be no surface
water withdrawals or
diversions.
V. Does the Proposal lie within a
100 -year floodplain? If so, note
location on the site plan.
Not to our knowledge.
© 2016 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 8 of 24 Renton, Washington
0 0
vi. Does the Proposal involve any
discharges of waste materials to
surface waters? If so, describe
the type of waste and anticipated
volume of discharge.
No, a public sanitary sewer
system will be installed to
serve the residential units.
There will be no discharge of
waste materials to surface
waters.
b. Ground.
Will groundwater be withdrawn
from a well for drinking water or
other purposes? If so, give a
general description of the well,
proposed uses and approximate
quantities withdrawn from the
well? Will water be discharged to
groundwater? Give general
description, purpose, and
approximate quantities if known.
No groundwater will be
withdrawn. Public water mains
will be installed to serve the
development. No water will be
discharged to the groundwater.
Describe waste material that will
be discharged into the ground
from septic tanks or other
sources, if any (for example:
Domestic sewage; industrial,
containing the following chemi-
cals; agricultural; etc.). Describe
the general size of the system,
the number of such systems, the
number of houses to be served (if
applicable), or the number of an-
imals or humans the system(s)
are expected to serve.
No waste material will be
discharged into the ground.
0 2016 Q. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 9 of 24 Renton, Washington
0 0
The Site will be served by
public sanitary sewer system.
C. Water Runoff (including storm water).
Describe the source of runoff
(including storm water) and
method of collection and
disposal, if any (include quanti-
ties, if known). Where will this
water flow? Will this water flaw
into other waters? If so,
describe.
See D.R. Strong Consulting
Engineers, Inc. Level One
Downstream Analysis Report.
ii. Could waste materials enter
ground or surface waters? If so,
generally describe.
The proposed stormwater
system will be designed to
minimize or eliminate entry of
waste materials or pollutants
to ground water resources
and/or surface waters. Oils,
grease, and other pollutants
from the addition of paved
areas could potentially enter
the groundwater or
downstream surface water
runoff.
iii. Does the proposal alter or
otherwise affect drainage
patterns in the vicinity of the site?
If so, describe.
The proposal will not affect the
drainage patterns in the
vicinity of the site. The new
development will discharge
water into a detention wetvault
and discharge at the site's
natural location.
@ 2016 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 10 of 24 Renton, Washington
P
F- 1
LJ
d. Proposed measures to reduce or control
surface, ground, and runoff water
impacts, if any.
A City approved drainage system will
be designed and constructed to
mitigate any adverse impacts from
storm water runoff. Temporary and
permanent drainage facilities will be
used to control quality and quantity
of surface runoff during construction
and after development.
4. PLANTS
a. Check or circle types of vegetation
found on the site:
x deciduous tree: alder, maple, aspen,
vine maple, cottonwood
other: apple, cherry, beech, dogwood,
filbert, holly, Italian plum, ornamental
plum,
x evergreen tree: fir, cedar, spruce, pine,
other: black locust, madrona,
x shrubs
grass (orchard grass)
x pasture
crop or grain
wet soil plants: cattail, buttercup,
bulrush, other:
water plants: water lily, eelgrass, milfoil,
other:
other types of vegetation (Deer fern,
blackberry, holly, scotch broom)
b. What kind and amount of vegetation will
be removed or altered?
Nearly all vegetation will be removed
or altered during construction. Trees
within the tree retention tract shall be
saved.
C. List threatened or endangered species
known to be on or near the site.
None to our knowledge.
0 2016 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 11 of 24 Renton, Washington
d. Proposed landscaping, use of native
plants, or other measures to preserve or
enhance vegetation on the site, if any.
If necessary, replacement trees will
be planted to mitigate for significant
trees removed. Landscaping will be
installed in accordance with the
provisions of the City of Renton's
Zoning Code.
e. List all noxious weeds and invasive
species known to be on or near the site.
None to our knowledge.
5. ANIMALS
a. Circle any birds and animals, which
have been observed on or near the site
or are known to be on or near the site.
birds: hawk heron, eagle,
ongbir s other:
mammals: deer ear, elk, beaver,
small rodents accoon,
other:
fish: bass, salmon, trout,
herring, shellfish other:
b. List any threatened or endangered
species known to be on or near the site.
None to our knowledge.
C. Is the site part of a migration route? If
so, explain.
Western Washington is in the
migration path of a wide variety of
non -tropical songbirds, and
waterfowl, including many species of
geese.
d. Proposed measures to preserve or
enhance wildlife, if any.
None at this time.
072016 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 12 of 24 Renton, Washington
e. List any invasive animal species known
to be on or near the site.
None to our knowledge.
6. ENERGY AND NATURAL RESOURCES
a. What kinds of energy (electric, natural
gas, oil, wood stove, solar) will be used
to meet the completed project's energy
needs? Describe whether it will be used
for heating, manufacturing, etc.
Electricity and/or natural gas will
serve as the primary energy source
for residential heating and cooking
within the development. Any wood
stoves incorporated into the new
residential units will comply with all
local and State regulations.
b. Would your project affect the potential
use of solar energy by adjacent
properties? If so, generally describe.
No.
C. What kinds of energy conservation
features are included in the plans of this
Proposal? List other proposed
measures to reduce or control energy
impacts, if any.
The required measures of the
Washington State Energy Code and
the Uniform Building Code will be
incorporated in the construction of
the residential units. Energy
conservation fixtures and materials
are encouraged in all new
construction.
7. ENVIRONMENTAL HEALTH
a. Are there any environmental health
hazards, including exposure to toxic
chemicals, risk of fire and explosion,
spill, or hazardous waste that could
@ 2016 D, R. STRONG Consulting Engineers Inc. The Pines
sEPA Checklist Page 13 of 24 Renton, Washington
0
0
occur as a result of this Proposal? If so,
describe.
There are no known on-site
environmental health hazards known
to exist today and none will be
generated as a direct result of this
proposal.
Describe any known or possible
contamination at the site from
present or past uses.
None to our knowledge.
ii. Describe any existing hazardous
chemicals/conditions that might
affect project development and
design. This includes
underground hazardous liquid
and gas transmission pipelines
located within the project area
and in the vicinity.
No hazardous chemicals or
conditions exist to our
knowledge.
iii. Describe any toxic or hazardous
chemicals that might be stored,
used, or produced during the
project's development or
construction, or at any time
during the operation of the life of
the project.
No toxic or hazardous
chemicals will be stored on the
site.
iv. Describe special emergency
services that might be required.
No special emergency services
will be required.
V. Proposed measures to reduce or
control environmental health
hazards, if any.
Special measures are not
anticipated.
(�) 2016 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 14 of 24 Renton, Washington
b. Noise
i. What types of noise exist in the
area which may affect your
project (for example: traffic,
equipment, operation, other)?
The primary source of off-site
noise in the area originates
from vehicular traffic present
on adjacent streets.
What types and levels of noise
would be created by or as-
sociated with the project on a
short-term or a long-term basis
(for example: traffic, construction,
operation, other)? Indicate what
hours noise would come from the
site.
Short-term impacts will result
from the use of construction
equipment during site develop-
ment and residential
construction. Construction will
occur during the day -light
hours, and in compliance with
all noise ordinances.
Construction noise is
generated by heavy equipment,
hand tools and the
transporting of construction
materials and equipment.
Long-term impacts will be
those associated with the
increased use of the property
by homeowners.
iii. Proposed measures to reduce or
control noise impacts, if any.
Construction will be performed
during normal daylight hours.
Construction equipment will be
equipped with noise mufflers.
® 2016 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 15 of 24 Renton, Washington
0 0
8. LAND AND SHORELINE USE
a. What is the current use of the site and
adjacent properties? Will the proposed
affect current land uses of nearby or
adjacent properties? If so, describe.
The current use of the site is two
single-family residences on 2.48
acres. The current use of adjacent
properties is listed as follows:
North: Single Family Residential
South: Single Family Residential
East: Single Family Residential
West: Single Family Residential
b. Has the project site been used as
working farmlands or working forest
lands? If so, describe. How much
agricultural or forest land of long-term
commercial significance will be
converted to other uses as a result of
the proposal, if any? If resource lands
have not been designated, how many
acres in farmland or forest land tax
status will be converted to non-farm or
non -forest use?
Not to our knowledge.
Will the proposal affect or be
affected by surrounding working
farm or forest land normal
business operations, such as
oversize equipment access, the
application of pesticides, tilling,
and harvesting? If so, how;
Not to our knowledge.
C. Describe any structures on the site.
The Site is currently developed with
two single family residences,
associated driveways, one detached
garage, two sheds, and a barn.
©2018 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 16 of 24 Renton, Washington
LJ
d. Will any structures be demolished? If
so, what?
Yes, all existing structures will be
demolished.
e. What is the current zoning classification
of the site?
The current zoning classification is
Residential, R-8.
f. What is the current comprehensive plan
designation of the site?
Residential Medium Density (RMD).
g. If applicable, what is the current
shoreline master program designation of
the site?
NIA
h. Has any part of the site been classified
critical area by the city or the county? If
so, specify.
Not to our knowledge.
Approximately how many people would
reside or work in the completed project?
Approximately 32 individuals will
reside in the completed residential
development (14 units x 2.3 persons
per household = 32.2 individuals).
Approximately how many people would
the completed project displace?
Approximately five people will be
displaced as a result of demolishing
two (2) existing structures.
k. Proposed measures to avoid or reduce
displacement impacts, if any.
None at this time.
1. Proposed measures to ensure the
Proposal is compatible with existing and
projected land uses and plans, if any.
The proposed development is
compatible with the prescribed land
C 2016 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 17 of 24 Renton, Washington
0 0
use codes and designations for this
site. Per the City Zoning Code, the
development is consistent with the
density requirements and land use of
this property.
M. Proposed measures to ensure the
Proposal is compatible with nearby
agricultural and forest lands of long-term
commercial significance, if any.
None are proposed.
9. HOUSING
a. Approximately how many units would be
provided, if any? Indicate whether high,
middle, or low-income housing.
The completed project will provide 14
detached single-family residential
homes. Homes will be priced with a
market orientation to the middle to
high-income level homebuyer.
b. Approximately how many units, if any,
would be eliminated? Indicate whether
high, middle, or low-income housing.
Two middle-income residences will
be eliminated.
C. Proposed measures to reduce or control
housing impacts, if any.
None.
10. AESTHETICS
a. What is the tallest height of any
proposed structure(s), not including
antennas; what is the principal exterior
building material(s) proposed?
The maximum building height will
conform to City of Renton's
Standards.
@2016 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 18 of 24 Renton, Washington
Ll
0
b. What view in the immediate vicinity
would be altered or obstructed?
Views in the vicinity are not likely to
be enhanced, extended or obstructed
by development of this project.
C. Proposed measures to reduce or control
aesthetic impacts, if any?
The location of the buildings adheres
to or exceeds the minimum setback
requirements of the zoning district.
The landscaping will be installed at
the completion of building and
paving construction. A Homeowners
Association will maintain the
landscaping and common elements.
11. LIGHT AND GLARE
a. What type of light or glare will the
Proposal produce? What time of day
would it mainly occur?
Light and glare will be produced from
building lighting. Light will also be
produced from vehicles using the
site. The light and glare will occur
primarily in the evening and before
dawn.
b. Could light or glare from the finished
project be a safety hazard or interfere
with views?
Light and glare from the project will
not cause hazards or interfere with
views.
c_ What existing off-site sources of light or
glare may affect your Proposal?
The primary off-site source of light
and glare will be from vehicles
traveling along the area roadways.
Also, the adjacent residential uses
and streetlights may create light and
glare.
Q 2016 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 19 of 24 Renton, Washington
:7
E
d. Proposed measures to reduce or control
light and glare impacts, if any.
Street lighting will be installed in a
manner that directs the light
downward. The proposed perimeter
landscaping will create a partial
visual buffer between the proposed
units and the surrounding
neighborhood areas.
12. RECREATION
a. What designated and informal
recreational opportunities are in the
immediate vicinity?
Kiwanis Park (At the east end of NE
9th St.)
Honey Dew Athletic Fields (Just east
of Kiwanis Park)
Highlands Elementary School
(intersection of Harrington Ave NE
and NE 7th St.)
b. Would the proposed project displace
any existing recreational uses? If so,
describe.
No.
C. Proposed measures to reduce or control
impacts on recreation, including
recreation opportunities to be provided
by the project or applicant, if any.
None.
13. HISTORIC AND CULTURAL PRESERVATION
a. Are there any buildings, structures, or
sites, located on or near the site that are
over 45 years old listed in or eligible for
listing in national, state, or local
preservation registers located on or near
the site? If so, specifically describe.
According to the Washington
Information System for Architectural
and Archaeological Records Data
(WISAARD) the properties of 850 &
© 2016 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 20 of 24 Renton, Washington
0
0
870 Monroe Avenue NE are not
houses or historic property recorded
in the inventory at this time.
b. Are there any landmarks, features, or
other evidence of Indian or historic use
or occupation? This may include human
burials or old cemeteries. Are there any
material evidence, artifacts, or areas of
cultural importance on or near the site?
Please list any professional studies
conducted at the site to identify such
resources.
None known.
C. Describe the methods used to assess
the potential impacts to cultural and
historic resources on or near the project
site. Examples include consultation with
tribes and the department of archeology
and historic preservation, archaeological
surveys, historic maps, GIS data, etc.
The King County GIS data and
Washington Information System for
Architectural and Archaeological
Records Data (WISAARD) was used
to assess the potential impacts to
cultural and historic resources on
and near the project.
d. Proposed measures to avoid, minimize,
or compensate for loss, changes to, and
disturbance to resources. Please
include plans for the above and any
permits that map be required.
No measures are anticipated. If an
archeological site is found during the
course of construction, the State
Historic Preservation Officer will be
notified.
14. TRANSPORTATION
a. Identify public streets and highways
serving the site or the geographic area,
and describe proposed access to the
C 2018 D. R. STRONG Consulting Engineers Inc_ The Pines
SEPA Checklist Page 21 of 24 Renton, Washington
0 9
existing street system. Show on site
plans, if any.
Access to the proposed project will
be from Monroe Avenue NE.
L Is the site or affected geographic area
currently served by public transit? If so,
generally describe. If not, what is the
approximate distance to the nearest
transit stop?
The nearest public transit stop is
approximately 0.1 miles northwest of
the Site at the intersection of NE 10th
St & Monroe Avenue NE. For Seattle
transit, 0.4 miles northwest of the
Site at the intersection of NE Sunset
Blvd and NE 10th St.
C. How many additional parking spaces
would the completed project or non -
project proposal have? How many
would the project or proposal eliminate?
The completed project will have
garage and driveway parking spaces.
Each home will have a minimum of
two -parking spaces per lot.
The project will eliminate all parking
spaces associated with the
structures being removed.
d. Will the Proposal require any new
improvements to existing roads, streets,
pedestrian, bicycle or state
transportation facilities, not including
driveways? If so, generally describe
(indicate whether public or private).
The proposal will improve the
frontage of Monroe Avenue NE, add
one internal road, and hammerhead
turnaround. All are public rights of
way.
e. Will the project use (or occur in the
immediate vicinity of) water, rail, or air
transportation? If so, generally describe.
No.
02016 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 22 of 24 Renton, Washington
0 0
How many vehicular trips per day would
be generated by the completed project?
If known, indicate when peak volumes
would occur and what percentage of the
volume would be trucks (such as
commercial or nonpassenger vehicles).
What data or transportation models
were used to make these estimates?
The project proposes 14 single-family
homes. Assuming 9.52 vehicular
trips per net unit per day, a total of
133.28 additional vehicle trips will be
generated. Peak hours will generally
be 7 AM — 9 AM and 4 PM — 8 PM.
g. Will the proposal interfere with, affect or
be affected by the movement of
agricultural and forest products on roads
or streets in the area? If so, generally
describe.
Not to our knowledge.
h. Proposed measures to reduce or control
transportation impacts, if any.
None.
15. PUBLIC SERVICES
a. Would the project result in an increased
need for public services (for example:
fire protection, police protection, health
care, schools, other)? If so, generally
describe.
Yes, the proposal will result in an
increase for those services typical of
a residential development of this size
and nature. The need for public
services such as fire and police
protection will be typical for a
residential development of the size.
School age children generated by
this development will attend schools
in Renton #403 School District.
C 2016 D. R, STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 23 of 24 Renton, Washington
•
i
b. Proposed measures to reduce or control
direct impacts on public services, if any.
In addition to payment of annual
property taxes by homeowners, the
proponent will mitigate the direct
impacts of the proposal through the
City's traffic and school mitigation
programs, if required.
16. UTILITIES
a. Circle utilities currently available at the
site:
Fic
=other.
system,
b. Describe the utilities that are proposed
for the project, the utility providing the
service, and the general construction
activities on the site or in the immediate
vicinity which might be needed.
Electricity: Puget Sound Energy
Natural Gas: Puget Sound Energy
Water & Sewer: City of Renton
Telephone: Century Link
C. SIGNATURE
The above answers are true and complete to the best
of my knowledge. I understand the lead agency is re-
lying on them to make its decision.
Signature: ql�xy 4�7_
Name of sign e: 4/0shio L. Piediscalzi, P.E.
Position and Agency/Organization: Project Engineer, D.R. Strong Consulting Engineers,
Inc.
DATE SUBMITTED: I. 1q,16
02016 D. R. STRONG Consulting Engineers Inc. The Pines
SEPA Checklist Page 24 or 24 Renton, Washington
LQ
King County
Records and Electlons Division
Recorder's Office
Ikpanment of Fkmulive smites
Kbit Cb nly A4minislralx111 BUdding
3W I „urh A,c,uc, Room 430
Sca¢k, WA99'(M „337
(206) 477fi620
(206) 29"109 TDD
(206) 2"396 FAX
Plat and Condominium Name Reservation Request
'lease NOTE: There is a $50.00 fee for this transaction
Reservation Tyne:
o PLAT
a CONDOMINIUM
Name Reserved
Reserved by:
Contact:
Telephone:
Address:
City, State, Zip:
The Pines
Harbour Homes, LLC
Ja:r,ie Wal tier
(206) 31.5-8130
400 N. 39th 5t., STE 300
Seattle, WA 98103
Section: C9 Township: 23N Range:______ 05E _
Quarter. NE/9 Quarter: 5W/4
Tax Parcel Number -092305-9116,-9117
Comments:
This name reservation will ire one year from the date this request is filed with the
KINC COUNTY RECORDERS OFFICE,
If the condominium ur plat has ool been declared within this time, and reservation of Ibis name is still
desired, a new NAME RESERVATION REQUEST must be filed.
The fee for Plat and Condo Name Reservations is 5511.04 per KCO 2.12.120.D
FOR RECORDERS USE ONLY:
Approved: _
Date Filed: _
Date Reservation Expires:
Sent to Assessor's: (Records)
(Assessor)
HARB0UR HOW S,L,LC
400 N 34THST SPE 300
S44771& WA 48103
(206) 31-5-4130
US BANK
1470 5T H AVE
seA'rn.t; WA461A2
ay
DATE CHeCK NO. AMOUhrr
Aptil 25, 2M 66468 $""**"*'60.00
Pay, Mi�R4*tR`*M►F�r4Rk�ff"aksr*�rttrira�rFAkAkriFliiy dollars and Ao Cents
PAY IONG COUNTY TREASURY
TOHE 500 4TH AVE #600
SEATTLE, WA 98104-2387
0
0
7011
1570 ODD3 1609
J;7
0876
0
1J
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT -- `nton
AFFIDAVIT OF INSTALLATION OF
PUBLIC INFORMATION SIGN
Planning Division
1055 South Grady Way, Renton, WA 98057
Phone: 425-430-7200 1 www.rentonwa.gov
STATE OF WASHINGTON j
j SS
COUNTY OF KING }
501260M. $ 11M being first
duly sworn on oath, deposes and says:
1. On the _ ?q day of _ Af V --"-L , 2016�;p , I installed J public
information sign(s) and plastic flyer box on the property located at
S J-41 M =- j -1196G g.IJ for the following project:
$7 `r t r -A o Z-1
Project Name
lev ECA '" n e
caner Name
2. 1 have attached a copy of the neighborhood detail map marked with an "X" to
indicate the location of the installed sign.
3. This/these public information sign(s) was/were constructed and installed in locations
in conformance with the requirements of Chapter 7 Title 4 of Renton Municipal Code
and the City's "Public Information Signs Installation" handout package.
Installer Signature
SUBSCRIBED AND SWORN to before me this a44" day of _-_ Apr, k --,20 Ito -
�0%" :y ' V ,+�i rh1401 I
14 hn
NOTARY PUBLid in and for the StafeJof Washington,
!
r 0 Mresidin a{oCIOs
My commission expires on
AH►N
-�'
H:\CED\Data\Forms-Templates\5elf-Help Hano'outs\Planning\pubsign.00c Rev: 08/2015
•
CHICAGO TITLE
C ri.iP.Ar\S' fl} WASH[NGTON
C:,
Order No.: 0059582-06
Property. 850 & 870 Monroe Avenue NE
Renton, WA 98056
SELLER(S)
Beverly Stinde
BUYERIBOR
Harbour Homes, LLC
ESCROW
Chicago Title Company of Washington
10500 NE 8th St., Suite 600
Bellevue, WA 98004
Phone: (425)455-4995
Fax: (425)646-9154
BUILDER
Harbour Homes LLC
1441 North 34th Street, Suite 200
Seattle, WA 98103
Phone: (206)315-8130
Fax: (206)315-8131
BUILDER
Geomerco Management, LLC
1441 North 34th St Suite 200
Seattle, WA 98103
Phone:
Fax:
701 5th Avenue, Suite 2300
SeEttle, WA 98104
Phone: (206)626.5610lFax: (296)62$.9717
Escrow Officer. Sherrill McCullough
Phone: 425-646-9887
Fax. 425-646-9154
Email: Sherrill.MCCullough@CTT.COM
Main Contact: Jamie Watller
Phone: (206)315-8130
Emafl: jwaltierc@harbourhomes.com
Main Contact: John Baringer
Phone: (208)352-2020
Cell: (206)3966687
Emafl: jbaringerfgeonerco.com
Thank You for specifying Chicago Title Company of Washington
Your transaction is important to us.
Cunmknew D&Nx lion Leper
WA0000924,pac 1 u�deled: 03 26.14 P**W: 02-3.16 6 02:11 PM by KM
Page 14 WA-CT-FN5EA2154.624641-0059582-06
ALTA COhRfli irEN1- FOR TITLE INSURANCE
Issued By agent:
CHICAGO TITLE
COMPANY OF WASHINGTON
S
Commitment Number:
0059582-06
CHICAGO TITLE INSURANCE COMPANY, a Nebraska corporation ('Company"), for a valuable consideration, commits to
issue its policy or policies of litle Insurance, as identified in Schedule A, in favor of the Proposed Insured named in
Schedule A, as owner or mortgagee of the estate or interest in the land described or referred to in Schedule A, upon
payment of the premiums and charges and compliance with the Requirements, all subject to the provisions of Schedules A
and B and to the Conditions of this Commitment.
This Commitment shall be effective only when the identity of the Proposed Insured and the amount of the policy or policies
committed for have been inserted in Schedule A by the Company_
All liability and obligation under this Commitment shall Cease and terminate six (6) months after the Effective Date or when
the policy or policies committed for shall issue, whichever first occurs, provided that the failure to issue the policy or
policies is not the fault of the Company.
The Company will provide a sample of the policy form upon request.
This Commitment shall not be valid or binding until countersigned by a validating off3oer or authorized signatory,
IN WITNESS WHEREOF, CHICAGO TITLE INSURANCE COMPANY has caused its corporate name and seal to be
affixed by its duly authorized officers on the date shown in Schedule A.
Chicago Tide Insurance Company
By.
�WNQA� 4-1
President
Countersigned By: ON Attest:
*we
Authorized Officer or Agent Secretary
Copyright American Land Tide Association. All rights reserved, u+EJC
urn tlnr
TheauaclarM•
use of This Form Is restricted to ALTA Ilrerwees and ALTA members N good standing as of the dale of use.
AA other uses are prohibfled. Regrir►tad under license hom the American Land InUe Association.
ALTA Gommftmnnl fRdopsed 06.17.2b(l8j Printed: 02.03.16 CY 42:11 FW
Per 1 WA-CT-FHSt:.02150.OM7&SMJ.1$4059W.06
CHICAGO TITLE COMPANY OF WASHINGTON -- COh'IMITfAENY' NQ. 0059582-0B
ISSUJNG OFFICE:
FOR SET', LEMENT iNIQUIRIES, CONTACT:
Title Officer; Cammerdi 1 Unit fi
Chicago Tige Company of Washington
Escrov� Officer, 5herrili Nir,Cullnugh ��
701 51h Avenue, Suite 2300
Chicago Title Company of Washington
Seattle, WA 96104
10500 FTE 6Lh St., suite 600
Main Phone: (206)628-5610 I
13011evue, 4A'A 3$004
PhonE: 425-646-9887 Fax: 425-646-9154;
Emall; CTIStaTitieUnit6@ctt.wm
Main Phone; (425)455.4995
Email: Sher6ll,MCCUIIOugh@CTT.com
SCHEDULE A
ORDER NO. 0059592-06
I. Effective Date: January 29, 2016 at 06:00 AM
2. Policy or (Policies) to be issued.-
ALTA
ssued:
ALTA Owner's Policy 2006
Proposed Insured: Harbour Homes, LLC , a Washington limited liabiility company
Policy Amount: $1,715,000.00
Premium: $ 4,362.00
Tax: $ 414.39
Rate: Extended
Discount(s): Combination
Total: $ 4,776.39
3. The estate or interest In the land described or referred to in this Commitment is:
Fee Simple
4. Tiffs to the estate or Interest in the land is at the Effective Date vested in:
Beverly D. Stinde, as her separate estate
S. The land referred to in this Commitment is described as follows:
SEE EXHIBIT "A' ATTACHED HERETO AND MADE A PART HEREOF
END OF SCHEDULE A
Copyright American Land TIHa Assoclatiam All rights nmmwvad. �m
,wrl�Ieui
luta TITLI
The Lisa of this Form is restricted to ALTA licensees and ALTA members In good standing as of the date of use. .I,><W
An other uses are prohibited. Reprinted under ikmnse from the American Land Title Association, IF
ALTA Camrnitmen7 (Adopted. 06.17.2006) Filmed: 02.02.15 G- 02:11 PN
POW 2 WA-CT-FNSE-021S4,8224ye SPS-1.1&oDD59%2.M
11
EXHIBIT "A"
Legal Description
11
The South 2 acres of the North 4 acres of the Southwest quarter of the Southwest quarter of the Northeast
quarter of Section 9, Township 23 worth, Range 5 East, W.M„ in King County, Washington;
Except the East 130 feet thereof; And
Except the West 30 feet for Monroe Avenue N.E.; Also
The North 2 acres of the Southwest quarter of the Southwest quarter of the Northeast quarter of Section
9, Township 23 North, Range 5 East, WM- in King County, Washington;
Except the West 30 feet for County Road;
Except the East 130 feet thereof; And
Except the North 48 feet.
Copyright American Land Title Association. All rights reserrgd. A •—
14 MC 7in?
The use Of this Form Is restricted to ALTA iicansms and ALTA members In good standing as of the deka of use. xuecum.
AD other uses are prohibited. Reprinted under license from the American Land Title Association,
ALTA Commitment (Adopted_ D6.17.2M) Pf{t�led; 02.03.16 C Dt11 PM
Pape 3 WA-CT-FNSE-0216o.M476-5P5.1•160pS W—M
nlf 'IY
SE C ,
0
0
CHICAGO TITLE COMPANY OF WASH114G1 ON -- COMMITMENT MO.0059582-0G
SCHEDULES
Schedule B of the policy or policies to be issued gill contain exceptions to the following matters unless the same are
disposed of to the satisfaction of the Company:
GENERAL EXCEPTIONS
A. Rights or claims of parties in possession, or claiming possession, not shown by the Public Records.
B. Any encroachment, encumbrance, violation, variation, or adverse circumstance affecting the Title that would be
disclosed by an accurate and complete land survey of the Land_
C. Easements, prescriptive rights, rights-of-way, liens or encumbrances, or claims thereof, not shown by the
Public Records.
D. Any lien, or right to a lien, for contributions to employee benefit funds, or for state workers' compensation, or
for services, labor, or material heretofore or hereafter fumished, all as imposed by law, and not shown by the
Public Records.
E. Taxes or special assessments which are not yet payable or which are not shown as existing liens by the Public
Records.
F. Any lien for service, installation, connecBon, maintenance, tap, capacity, or construction or similar charges for
sewer, water, electricity, natural gas or other ublides, or for garbage collection and disposal not shown by the
Public Records.
G. Unpatented mining claims, and all rights relating thereto.
H_ Reservations and exceptions in United States Patents or in Acts authorizing the issuance thereof,
I. Indian tribal codes or regulations, Indian treaty or aboriginal rights, including easements or equitable servitudes.
J. Water rights, claims or title to water.
K. Defects, liens, encumbrances, adverse claims or other matters, if any, created, first appearing in the Public
Records, or attaching subsequent to the effective date hereof but prior to the date the proposed Insured acquires
of record for value the estate or interest or mortgage thereon covered by this Commitment.
Copyright A"wrtcan Land Tltlt Aeaodetion. All rights re"m d. kwr� R
u nTM
The use of this Form is restricted to ALTA licensees and ALTA members in Goad standing ss of the dale of use. 11w One
All other uses are prohibited. Reprinted under Ikerlse from the American Land Title Association
, Iffit
ALTA Ccrnmitmenl (Adopted: 06 17-7m91 Printed; czo3,1E @ 1722:11 TJ f
Pepe 4 VVA-CT-FNSE-o215o,622476-SPS-1-16406Vju.M
0 0
CHICAGO I'll LE COMPANY OF WASHINGTON COMMJTMEaNT NO, 04595132-06
SCHEDULE 8
(continued)
SPECIAL EXCEPTIONS
Reservations and exceptions contained in the deed
Grantor: Northern Pacific Railroad Company
Recording No,: 4450143
Reserving and excepting from said lands so much or such portions thereof as are or may be mineral lands or
contain coal or iron, and also the use and the right and title to the use of such surface ground as may be
necessary for ground operations and the right of access to such reserved and excepted mineral lands, including
lands containing coal or iron, for the purpose of exploring, developing and working the land.
The Company makes no representations about the present ownership of these reserved and excepted interests.
Said instrument amends instrument recorded under recording no, 51717.
zzz Payment of the real estate excise tax, if required.
,�?4 The Land is situated within the boundaries of local taxing authority of City of Renton.
Present rate of real estate excise tax as of the date herein is 1.78 percent,
Any conveyance document must be accompanied by the official Washington State Excise Tax Affidavit. The
applicable excise tax must be paid and the affidavit approved at the Ume of the recording of the conveyance
documents, (NOTE: Real Estate Excise Tax Affidavits must be printed as legal size forms).
An additional $5.00 Electronic Technology Fee must be included in all excise tax payments.
if the transaction €s exempt, an additional $5.00 Affidavit Processing Fee is required.
General and special taxes and charges, payable February 15, delinquent If first half unpaid on May f, second half
deflnquent if unpaid on November 1 of the tax year (amounts do not include Interest and penalties):
% Year: 2015
Tax Account No.: 092305-9116
Levy Code: 2100
Assessed Value -Land: $323,400.00
Assessed Value -improvements: $108,000.00
General and Special Taxes:
Billed: $5,457.91
Paid: $5,457.91
Unpaid: $0.00
Affects: South 2 acres
Copyright American Land TMIe Associetton. All rights reserved. •H�c�
LLMP hili
The use of this Form is resticted to ALTA licens:aes end ALTA members in gow stondiry as of
A U other uses are prohVied. Reprinted under license from the American Land Title Association the date of use.
ALTA Go nmirmeni (Adopted: 06,17.2ppE) POW: 02-OZ.16 U 02;11 p44
paw 5 WA-CT-FWA-02150.6224765PS.1-I&WSM2-M
• 0
CHICAGO I'll LE C:Gi►&ANY OF WASH114GTONC1JI�;lti,1Tt►�Ef<rT NO. 0059582-06
SCFEDULS U
(continued)
i
!. General and specied tuxes and charges, payable February 15, delinquent it first half unpaid or, May 1, second half
delinquent if unpaid on November 1 of the tax year (amounts do not include interest and penalties);
> Year: 2015
Tax Account No.: 092305-9117
64, Levy Code: 2100
Assessed Value -Land: $245,0O0,DD
Assessed Value -Improvements: $33,000.00
General and Special Taxes:
Billed' $3,524.88
Paid; $3,524.88
Unpaid: $0.00
Affects: North 2 acres
i" , Property taxes, which are a lien not t due and
k�� levied for the fiscal � PaYabla,rnciuding any assessments collected with taxes to be
year 2016.
6. Please be advised that our search did not disclose any open mortgages of record. If you should have knowledge
of any outstanding obligation, please contact the Tittle Department immediately for further review prior to closing.
7, In the event that the Land is occupied or intended to be occupied by the owner and a spouse or registered
domestic partner as a homestead, ale conveyance or encumbrance of the Land must be executed and
acknowledged by both spouses or both registered domestic partners, pursuant to RCW 6.13 which now provides
for an automatic homestead on such Land.
r in the event title to said Land Is acquired by the party(les) named below, the policy(s), when issued, will show the
following additional €tem(s) in Schedule B, unless disposed of to the satisfaction of the Company.
Ptarty(les): Harbour Homes LLC
Item(s): at paragraph 9
J
copyright American Land Title Aasocietlon. All rights reserved. AMIRICAN
lAYO TIM
The Aub�
use of ehla Form Is restricted I4 ALTA licensees and ALTA members in good sl8ndira8 as of the dots of use.
All olhar usss are prohibited. Reprinted under Ik*nnse from the American Land Title Association.
ALTA Commrtmeni IAdopteC: 06 17.2f10('j Primed: DZ.O3.16 g02;i i pm
Page 0i WA-CT-FNSE-OT159.G2247B SM -1-1 600595$2-08
• 0
CIAICAGO UTILE COMPANY OF WASHINGTON CO1�iMiTMiEh1T htQ. 0059562-06
SCHEDULE B
(continued)
The Company will require the following documents for review prior to the issuance of any title insurance predicated
upon a conveyance or encumbrance from the entity named below_
Limited Liability Company: Harbour Homes LLC
a. A copy of its operating agreement, if any, and any and all amendments, supplements and/or
modifications thereto, certified by the appropriate manager or member.
b. if a domestic Limited Liability Company, a copy of its Articles of Organization and all amendment thereto
with the appropriate filing stamps.
c. If the Limited Liability Company is member -managed a full and complete current list of members
certified by the appropriate manager or member.
d. if the Limited Liability Company was formed in a foreign jurisdiction, evidence, satisfactory to the
Company that it was validly formed, is in good standing and authorized to do business in the state of
origin.
e. If less than elf members, or managers, as appropriate, will be executing Oe closing documents, furnish
evidence of the authority of those signing.
The Company reserves the right to add additional items or make further requirements after review of the
requested documentation.
10. To provide an extended coverage owner's policy, general exceptions A through A may be eliminated or limited
after an inspection of the Land and/or review of the survey, if required, is completed. General exceptions E
through J will remain In the owner's policy to be issued.
If the anticipated closing date is less than 4 weeks from the date of this commitment, please contact your title
officer immediately.
11. Your application for title insurance was placed by reference to only a street address or tax identification
number. Based on our records, we believe that the legal description in this report covers the parcels) of
Land that you requested, If the legal description is Incorrect, the seller/borrower must notify the Company
and/or the settlement company in order to prevent errors and to be certain that the correct parcel(s) of
Land will appear on any documents to be recorded in connection with this transaction and on the policy
of title insurance,
END OF EXCEPTIONS
NOTES
The following matters will not be listed as Special Exceptions In Schedule B of the pollcy. There will be no coverage for
loss arising by reason of the matters listed below because these matter; are either excepted or excluded from coverage or
are not matters covered under the insuring provisions of the policy.
Copyright American Land TFtle Assaclatlon. All lights reserved,
.wnic,.H
ieKo rini
The use or this Form Is restricted to ALTA licensees and ALTA rnernbets In
Ail other uses are prohibited. Reprinted under license from the American Land /ass ps�� the date of use,
ALT! Cornmi',mpnt (hdoplcd D6, 7.2ppF; - -� Rirgad: U2-03,16 0 02:i7 PA!
Page 7 WA4'-T.F►iSE.02160.=476-5pS-1-164pp �M
CHICAGO III LE C:OMiPANY OF WASHING1014 COh(AStTNEt11 NO, 0059562-€I6
SCHEDULE E
(continued)
Note A- Mote: In the event the owner's policy coverage is changed from extended to standard coverage a
charge of $200.00, plus $17.60 sates tax, will be added to cover the costs relating to the extended
coverage inspection.
Note B: NOTE: The premium for the Extended Coverage Owner's Policy is itemized as follows:
Standard Coverage: $3,231.00
Sales tax: $306.93
Extended coverage surcharge: $1,131.00
Sales tax on surcharge: $107.46
TOTAL PREMIUM, INCLUDING TAX: $4,776.39
Your Invoice to follow, will include
Inspection charge: $230.00
Sales tax: $21.85
TOTAL CHARGES, INCLUDING TAX: $5,026.24
Note C: Note. FOR INFORMATIONAL PURPOSES ONLY:
The following may be used as an abbreviated legal description on the documents to be recorded, per
Amended RCW 65.04.045. Said abbreviated legal descrlptlon is not a substitute for a complete legal
description within the body of the document.,
pin north 4 acres swq neq sn 9-23-05 Tax/Map ID(s):
Tax Account No.: 092305-9116 and 092305-9117
Mote D. Note: Any map furnished with this Commitment is for convenience In locating the land indicated herein
with reference to streets and odher land. No liability is assumed by reason of reliance thereon.
END OF NOTES
END OF SCHEDULE B
Copyright American Land Tape Aseociatlon. All rights reserved.
The use of this Form Is restricted to ALTA licensees and ALTA members in good stsnding as of the date of use,
AU other uses are prohibited. Reprinted under baensa from the American Land True Association,
41-7 Ai.4fi717iflmrni fArinntr ri' (IF; 77 7f}f7F\
Noted, 02.03
W A -CT -FRS E-02150.W4?6.$PS-1
=
rr
r.wexrcr
Lura rn tt
.�roruno�
X2:11 PM
i 0
geoAdvantage: King County of Washington State (App3) Page i of 1
http://geo-sentrydynamics.net/WA—King/default.aspx 212/2016
I
IS
l 14
http://geo-sentrydynamics.net/WA—King/default.aspx 212/2016
0
CHICAGO TITLE
COMPANY 01 1iASITYNG1 ON
Chicago Title Company of Washington
701 5th Avenue, Suite 2300
Seattle, WA 98104
SUPPLEMENT 7
Title Officer: Commercial ! Unit 6
Esc. Officer: Sherrill McCullough
Property: 850 8 870 Monroe Avenue NE
Renton, WA 98056
Sorrower(s): Harbour Homes, LLC
Seller(s): Beverly Stlnde
Order No.: 0059582-06
The above numbered report with an Effective Date of January 29, 2016 Including any supplements or
amendments thereto, is hereby modified and/or supplemented In order to reflect the following:
The following items/notes have been changed on your report:
ITEMS.
10. To provide an Extended Coverage Owner's Policy, General Exception A is hereby deleted. Please see Special
Exception 12 related to General Exceptions B and C. General Exceptions E through H will remain in the
owner's policy to be issued.
General Exception D. Our Inspection of said premises on 211212016 disclosed no apparent lien rights.
" Please notify your title officer, Mike Harris at 206-628-5623, if work is started or materials delivered prior to
closing. `"
The following Items/notes have been added to your report:
ITEMS:
12. Due to fences and lack of comer monuments, the following matters will show on the Extended Coverage
Owner's Policy to issue:
A. Any loss or damage resulting from the encroachment of perimeter fences, perimeter walls and plantings of
any nature onto or off from the subject property.
This paragraph may be amended or deleted upon the submission and review of an ALTA survey certified to
this company.
Supplemental Printed: 03.03.15 0 1209 PM by KR
SSCORPID5190,Am I Updated: 19.30,14 pica 1 WA -C7 •F NSE-02160LE2A 641-d05s587- M
SUPPLEMENTAL
(continued)
13. General and special taxes and charges, payable February 15, delinquent if first half unpaid on May 1, second
half delinquent if unpaid on November 1 of the lax year (amounts do not include interest and penalties):
Year:
2016
Tax Account No.:
092305-9116
Levy Code:
2100
Assessed Value -Land:
$344,000.00
Assessed Value -Improvements: $115,000.00
General and Special Taxes:
Billed:
$6,080.86
Paid:
$0.00
Unpaid:
$6,080.86
Affects: South 2 acres
14. General and special lazes and charges, payable February 15, delinquent if first half unpaid on May 1, second
half delinquent if unpaid on November 1 of the tax year (amounts do not include interest and penalties):
Year: 2016
Tax Account No.: 092305-9117
Levy Code: 2100
Assessed Value -land: $267,000.00
Assessed Value -Improvements: $35,000.00
General and Special Taxes:
Billed:
$3,925.90
Paid.
$0.00
Unpaid:
$3,925,90
Affects:
North 2 acres
The following Items/notes have bsen intentionally deleted from your report:
ITEMS: 3., 4., 5., 8. and 9.
For He inquiries, please contact the issuing offrce:
Chicago Title Company of Washington
701 5th Avenue, Suite 2300
Seattle, WA 98104
For settlement Inquiries, please contact the settlement office:
Chicago Title Company of Washington
10500 NE 8th St., Suite 600
Bellevue, WA 98004
Phone: (206)628-5610
Fax: (206)628-9717
Email: CTISEA7illeUnft6@cti.com
Phone: (425)4554995
Fax: (425)646-9154
Email: CTIBellevueEscrow@fnf.com
Supplamantal
SSCQRPD5190.doc I Updated; i0,30 14Primed: 03.03,16 @ 12:09 PM by KR
Pogo 2 WA-CT-FNSF-02150.624541•D M9582-06
SUPPLEMEhi AL
(coniinued)
Supplemental Date: March 3, 2016
Countersigned By:
Authorized Officer or Agent
0
Supplemenkal NMWd: 03.43.16 9, 12:49 PIA Gy KR
55CbRPD518D.doe 1 Updated: 10 3Q.1< Page, 3 WA -CI -FNSF•0215U,624r,4 1-005958 2-05
nn CHICAGO TITLE
CR)
Chicago Title Company of Washington
701 5th Avenue, Suite 2300
Seattle, WA 98104
•
SUPPLEMENT 2
Title Officer: Commercial / Unit 6
Esc. Officer: Sherrill McCullough
Property: 850 & 870 Monroe Avenue NE
Renton, WA 98056
Borrower(s): Harbour domes, LLC
Seller(s): Beverly Stinde
Order No.: 0059582-06
The above numbered report with an Effective Date of April 13, 2016 including any supplements or amendments
thereto, is hereby modified and/or supplemented in order to reflect the following:
The effective date is amended as follows:
The Effective Date of January 29, 2016 is hereby amended to be: April 13, 2016 at 08:00 AM
The following items/notes have been changed on your report:
ITEMS:
13. General and special taxes and charges, payable February 15, delinquent if first half unpaid on May 1, second
half delinquent if unpaid on November 1 of the tax year (amounts do not include interest and penalties):
Year: 2016
Tax Account No.: 092305-9116
Levy Code: 2100
Assessed Value -Land: $344,000.00
Assessed Value -Improvements: $115,000.00
General and Special Taxes.
Billed:
Paid:
Unpaid:
Affects:
$6,080.86
$3,040.42
$3.04D.42
South 2 acres
Supplemental Printed: 04.21.16 @ 64.11 PM by KR
SSCORPD5190.doc ! Updated: 10 30 14 Page 1 WA-CT-FNSF-02150 624641-6059582-66
SUPPLEMENTAL
(continued)
14. General and special taxes and charges, payable February 15, delinquent if first half unpaid on May 1, second
half delinquent if unpaid on November 1 of the tax year (amounts do not include interest and penalties):
Year:
2016
Tax Account No.:
092305-9117
Levy Code:
2100
Assessed Value -Land:
$261,000.00
Assessed Value -Improvements: $35,000.00
General and Special Taxes:
Billed:
$3,925.90
Paid:
$1,962.95
Unpaid:
$1,962.95
Affects: North 2 acres
For title inquiries, please contact the issuing office:
Chicago Title Company of Washington
701 5th Avenue, Suite 2300
Seattle, WA 98104
For settlement inquiries, please contact the settlement office:
Chicago Title Company of Washington
10500 NE 8th St., Suite 600
Bellevue, WA 98004
Supplemental Date: April 21, 2016
Countersigned By:
Authorized Officer or Agent
Phone: (206)628-5610
Fax: (206)628-9717
Email: CTISEATitleUnit6@ctt.com
Phone: (425)455-4995
Fax: (425)646-9154
Email: CTIBellevueEscrow@fnf.com
Supplemental Printed: 04.21.16 @ 04:11 PM by KR
SSCORPD5190 doc 1 Updated 1030.14 Page 2 WA-CT-FNSE-02150.624641-0059582-06
•
CHICAGO TITLE
("O1\IPANY ())' 117151IIN6 J ON
Harbour Homes, LLC
1441 North 34th Street, Suite 200
Seattle, WA 98103
n
SUPPLEMENT 3
Title Officer: Commercial /Unit 6
Esc. Officer: Sherrill McCullough
Property: 850 & 870 Monroe Avenue NE
Renton, WA 98056
Borrower(s): Harbour Homes, LLC
Seller(s): Beverly Stinde
Order No.: 0059582-06
The above numbered report with an Effective Date of May 4, 2016 including any supplements or amendments
thereto, is hereby modified and/or supplemented in order to reflect the following:
The effective date is amended as follows:
The Effective Date of January 29, 2016 is hereby amended to be: May 4, 2016 at 08:00 AM
The following items/notes have been changed on your report:
ITEMS:
13. General and special taxes and charges, payable February 15, delinquent if first half unpaid on May 1, second
half delinquent if unpaid on November 1 of the tax year (amounts do not include interest and penalties):
Year: 2016
Tax Account No.: 092305-9116
Levy Code: 2100
Assessed Value -Land: $344,000.00
Assessed Value -Improvements: $115,000.00
General and Special Taxes:
Billed.
Paid:
Unpaid:
Affects:
$6,080.86
$3,040.42
$3.040.42
South 2 acres
Supplemental Printed: 05.11.16 @ 04:27 PM by MH
SSC0RPD5190 tlac I Updated: 03.22.16 Page 1 WA-CT-FNSE-02150 624641-0053582-D6
SUPPLEMENTAL
(continued)
14. General and special taxes and charges, payable February 15, delinquent if first half unpaid on May 1, second
half delinquent if unpaid on November 1 of the tax year (amounts do not include interest and penalties):
Year: 2016
Tax Account No.: 092305-9117
Levy Code: 2100
Assessed Value -Land: $261,000.00
Assessed Value -Improvements. $35,000.00
General and Special Taxes:
Billed:
$3,925.90
Paid:
$1,962.95
Unpaid:
$1,962,95
Affects:
North 2 acres
For title inquiries, please contact the issuing office:
Chicago Title Company of Washington
701 5th Avenue, Suite 2300
Seattle, WA 98104
For settlement inquiries, please contact the settlement office:
Chicago Title Company of Washington
10500 NE 8th St., Suite 600
Bellevue, WA 98004
Supplemental Date: May 11, 2016
Countersigned By:
Authorizers Officer or Agent
Phone: (206)628-5610
Fax_ (206)628-9717
Email: CTISEATitleUnit6@ctt.com
Phone: (425)455-4995
Fax: (425)646-9154
Email: CTIBellevueEscrow@fnf.com
Supplemental Punted: 05.11.16 @ 04:27 PM by MH
SSCORPD5190 doc r Updated: 0322 16 Page 2 HVA-CT-FNSE-02150,624641-0059582-06
0
Atter Recording Return to:
Harbour Homes, LLC
Attn: John Baringer
400 North 34'x' Street, Suite 300
Seattle, WA 98103
0
DOCUMENT TITLE: DECLARATION OF COVENANTS, CONDITIONS AND
RESTRICTIONS FOR THE PLAT OF
GRANTOR: HARBOUR HOMES, LLC
GRANTEE: HOMEOWNERS ASSOCIATION AND THE PUBLIC
LEGAL DESCRIPTION:
PARCEL NUMBERS: 0923059116 and 0923059117
h
After Recording Return to:
Harbour Homes, LLC
Attn: John Baringer
400 North 34"' Street, Suite 300
Seattle. WA 98103
DECLARATION
OF
0
COVENANTS, CONDITIONS,
AND RESTRICTIONS
FOR
THE PLAT OF
2
0
9
DECLARATION OF COVENANTS, CONDITIONS,
AND RESTRICTIONS
FOR THE PLAT OF
THIS DECLARATION is made on the date set forth below by Harbour Homes, LLC,
Washington limited liability company ("Declarant').
RECITALS
A. Declarant is the owner of that certain real property located in the City of
Renton, County of Washington, and more particularly described in Article 2
of this Declaration.
B. Declarant desires to subject the real property described in Article 2 hereof to
the provisions of this Declaration to create a residential community of single-family housing
(as "single family" is defined below) and related uses as set forth in Section 6.2 hereof.
NOW, THEREFORE, Declarant hereby declares that the real property described in
Article 2 of this Declaration, including the improvements constructed or to be constructed
thereon, is hereby subjected to the provisions of this Declaration and shall be held, sold,
transferred, conveyed, used, occupied, and mortgaged or otherwise encumbered subject to the
covenants, conditions, restrictions, easements, assessments, and liens, hereinafter set forth,
which are for the purpose of protecting the value and desirability of, and which shall run with
the title to, the real property hereby or hereafter made subject hereto, and shall be binding on
all persons having any right, title, or interest in all or any portion of the real property now or
hereafter made subject hereto, their respective heirs, legal representatives, successors,
successors -in -title, and assigns and shall inure to the benefit of each and every owner of all or
any portion thereof.
ARTICLE I
DEFINITIONS
1.1 Words Defined. The following words, when used in this Declaration or in any
Supplementary Declaration (unless the context shall prohibit), shall have the following
meanings:
1.1.1 "Association" shall mean Homeowners
Association, a Washington nonprofit corporation, its successors and assigns.
1.1.2 "Board of Directors" or "Board of the Association shall be the
appointed or elected body, as applicable, having its normal meaning under Washington law.
3
1.1.3 "Bvla�vs shall refer to the Bvlm� s ol'the
Homeowners Association.
L I A "Common Areas" shall paean any and all real and personal property and
easements and other interests therein, together with the facilities and improvements located
thereon as designated on the final plat of the Community or as otherwise conveyed to the
Association for the common use and enjoyment of the Owners_
1.1.5 "Community" shall mean and refer to that certain real property and
interest therein described in Article 2, and such additions thereto as may be made by Declarant
by Supplementary Declaration.
1.1.6 "Community -Wide Standard" shall mean the standard of conduct,
maintenance, or other activity generally prevailing in the Community. Such standard may be
more specifically detennined by the Board of Directors_ Such determination, however, shall
generally be made with reference to the standards originally established by the Declarant.
1.1.7 "Declarant" shall mean and refer to Harbour Homes, LLC and its
successors -in -title and assigns, provided any such successor -in -title or assign shall acquire for
the purpose of development or sale all or any portion of the remaining undeveloped or unsold
portions of the real property described in Article 2, and provided further, in the instrument of
conveyance to any such successor -in -title or assign, such successor -in -title or assign is
designated as the "Declarant" hereunder by the grantor of such conveyance, which grantor
shall be the "Declarant" hereunder at the time of such conveyance; provided, further, upon
such designation of such successor Declarant, all rights of the former Declarant in and to such
status as "Declarant" hereunder shall cease, it being understood that as to all of the property
described in Article 2, which is now subjected to this Declaration, there shall be only one
"Declarant' hereunder at any one point in time.
1.1.8 "Development Period" shall mean that period of time beginning on the
date this Declaration is recorded in the records of King County and ending on the date
Declarant holds a special meeting of the Association, in accordance with the Bylaws, for the
purpose of transitioning the management of the Association from the Declarant to the Owners.
1.1.9 "Governing Documents" shall mean and refer to this Declaration, the
Articles of Incorporation (if any) and Bylaws of the Association, and rules and regulations (if
any) of the Community adopted by the Board, as any of the foregoing may be amended from
time to time.
1.1.10 "Lot" shall mean any plot of land within the Community, whether or
not improvements are constructed thereon, which constitutes or will constitute, after the
construction of improvements, a residential dwelling site as shown on a plat recorded in the
records of King County.
4
1.1.1 1 '"Mort -a4 -c" means anv mortgage, deed of trust. and any and all other
similar instruments used for the purpose of encumbering real property in the Community as
security for the payment or satisfaction of an obli�(Tation_
1.1.1? ..Mortgagee" shall mean the holder of a Mortgage.
1.1.1 3 "Occupant" shall mean any Person occupying all or any portion of a
residence or other property located within the Community for any period of time, regardless of
whether such Person is a tenant or the Owner of such property.
1.1.14 "Owner" shall mean and refer to the record owner_ whether one or more
Persons, of the fee simple title to any Lot located within the Community, excluding, however,
any Person holding such interest merely as security for the payment or satisfaction of an
obligation.
1.1.15 "Person" means any natural person, as well as a corporation, joint
venture, partnership (general or limited), association, trust, or other legal entity.
1.1.16 "Single Family"shall mean a single housekeeping unit, without regard
to the construction type or ownership of such unit, that includes not more than four (4) adults
who are legally unrelated.
1.1.17 "Supplementary Declaration" means an amendment or supplement to
this Declaration which subjects additional property to this Declaration or that imposes,
expressly or by reference, additional or modified restrictions and obligations on the land
described therein.
1.1.18 "Total Association Vote" means all of the votes attributable to
members of the Association (including votes of Declarant).
ARTICLE Z
PROPERTY SUBJECT TO THIS DECLARATION
The real property which is, by the recording of this Declaration, subject to the
covenants and restrictions hereafter set forth and which, by virtue of the recording of this
Declaration, shall be held, transferred, sold, conveyed, used, occupied, and mortgaged or
otherwise encumbered subject to this Declaration is the real property described as:
LOTS — THROUGH _, INCLUSIVE, OF , ACCORDING
TO THE PLAT THEREOF RECORDED IN VOLUME OF PLATS AT PAGES
AND _ RECORDS OF COUNTY, WASHINGTON RECORDED
UNDER RECORDING NUMBER
SITUATE IN THE COUNTY OF
5
STATE OF WASHINGTON
L
0
Private Tracts: List Tracts and part? responsible fnr ownership and maintenance
Common Areas: List Common areas acrd party re5lyonslhle for ownership and maintenance
ARTICLE 3
HOMEOWNERS ASSOCIATION
3.1 Description of Association. The Association may, at the election of the
Declarant or the Association, be incorporated as a non-profit corporation organized and
existing under the laws of the State of Washington. The Association shall be charged with the
duties and vested with the powers prescribed by law and set forth in the Governing
Documents; provided, however, that no such Governing Documents, other than the
Declaration, shall for any reason be amended or otherwise interpreted so as to be inconsistent
with this Declaration.
3.2 Board of Directors. Declarant shall have the right to appoint or remove any
member or members of the Board of Directors or any officer or officers of the Association
until termination of the Development Period. Each Owner, by acceptance of a deed to or
other conveyance of a Lot, vests in Declarant the authority to appoint and remove directors
and officers of the Association during the Development Period. The directors selected by the
Declarant need not be Owners. The number of directors shall be as set forth in the Bylaws.
Following termination of the Development Period, the Board of Directors shall be elected by
the Owners in accordance with the Bylaws.
3.3 Membership. Every Owner of a fee interest in any Lot that is subject to this
Declaration shall be deemed to have a membership in the Association and membership in the
Association shall consist exclusively of such owners. The foregoing is not intended to include
Persons who hold an interest merely as security for the performance of an obligation, and the
giving of a security interest shall not tenninate the Owner's membership. No Owner, whether
one or more Persons, shall have more than one (1) membership per Lot. Membership shall be
appurtenant to and may not be separated from ownership of any Lot. The rights and privileges
of membership, including the right to vote and to hold office, may be exercised by a member
or the member's spouse, but in no event shall more than one (1) vote be cast nor office held
for each Lot owned.
3.4 Voting. Members shall be entitled to one (1) vote for each Lot owned. When
more than one (1) Person holds an ownership interest in any Lot, the vote for such Lot shall be
exercised as those Owners themselves determine and advise the Secretary prior to any
meeting. In the absence of such advice, the Lot's vote shall be suspended in the event more
than one (1) Person seeks to exercise it.
3.5 Architectural Control Committee. No construction, alteration, addition,
refurbishing, or erection of any structure or any nature whatsoever shall be commenced or
0 9
placed upon any part of the Community, except that which is installed by the Declarant, or is
approved in accordance with this Section, or as is otherwise expressly permitted herein. Any
such construction. alteration.. addition, refurbishing, or erection shall not be made unless and
until plans and specifications showing the nature, kind, shape, size and height, architectural
design and detail, materials, workmanship, colors, location on site, improvement and site
grade elevations, and site landscaping, shall have been submitted in writing to and approved by
the Architectural Control Committee (the "ACC") established pursuant to this Section 3.5.
The Board may employ architects, engineers, or other Persons as it deems necessary to enable
the ACC to perform its review. Written design guidelines and procedures ("Design
Guidelines") may be established by the Board for the exercise of this review, which Design
Guidelines may provide for a review fee. Copies of the Design Guidelines shall be available
to all Owners upon request for a reasonable fee.
3.5.1 The ACC shall consist of not less than one (1) nor more than five (5)
members, who need not be Owners. So long as the Declarant owns any property for
development and/or sale in the Community, the Declarant shall have the right to appoint or
remove any or all members of the ACC. Upon the expiration or earlier surrender in writing of
such right, the Board shall appoint the members of the ACC, however the ACC shall include
two members of the Board.
3.5.2 Members of the ACC shall not be entitled to compensation for services
performed pursuant to this Section 3.5. The Association shall defend, indemnify, and hold
each members of the ACC harmless for any liability incurred while serving as a member of
the ACC.
3.5.3 The ACC shall be the sole arbiter of plans submitted to it and may
withhold approval for any reason, including aesthetic considerations, and it shall be entitled to
stop any construction in violation of approved plans or this Declaration.
3.5.4 PLANS AND SPECIFICATIONS ARE NOT APPROVED FOR
ENGINEERING OR STRUCTURAL DESIGN OR QUALITY OF MATERIALS, AND BY
APPROVING SUCH PLANS AND SPECIFICATIONS NEITHER THE ACC. THE
MEMBERS THEREOF, NOR THE ASSOCIATION ASSUMES LIABILITY OR
RESPONSIBILITY THEREFOR, NOR FOR ANY DEFECT IN ANY STRUCTURE
CONSTRUCTED FROM SUCH PLANS AND SPECIFICATIONS. NEITHER
DECLARANT, THE ASSOCIATION, THE ACC, THE BOARD, NOR THE OFFICERS,
DIRECTORS, MEMBERS, EMPLOYEES, AND AGENTS OF ANY OF THEM SHALL BE
LIABLE IN DAMAGES TO ANYONE SUBMITTING PLANS AND SPECIFICATIONS
TO ANY OF THEM FOR APPROVAL, OR TO ANY OWNER OF PROPERTY
AFFECTED BY THESE RESTRICTIONS BY REASON OF MISTAKE IN JUDGMENT,
NEGLIGENCE, OR NONFEASANCE ARISING OUT OF OR IN CONNECTION WITH
THE APPROVAL OR DISAPPROVAL OR FAILURE TO APPROVE OR DISAPPROVE
ANY SUCH PLANS OR SPECIFICATIONS. EVERY PERSON WHO SUBMITS PLANS
OR SPECIFICATIONS AND EVERY OWNER AGREES THAT SUCH PERSON OR
OWNER WILL NOT BRING ANY ACTION OR SUIT AGAINST DECLARANT, THE
ASSOCIATION, THE ACC, THE BOARD, OR THE OFFICERS, DIRECTORS,
7
0 0
MEMBERS, EMPLOYEES, AND AGENTS OF ANY OF THEM TO RECOVER ANY
DAMAGES AND HEREBY RELEASES, REMISES, QUITCLAIMS, AND COVENANTS
NOT TO SUE FOR ALL CLAIMS, DEMANDS, AND CAUSES OF ACTION ARISING
OUT OF OR IN CONNECTION WITH ANY JUDGMENT, NEGLIGENCE, OR
NONFEASANCE AND HEREBY WAIVES THE PROVISIONS OF ANY LAW WHICH
PROVIDES THAT A GENERAL RELEASE DOES NOT EXTEND THE CLAIMS,
DEMANDS, AND CAUSES OF ACTION NOT KNOWN AT THE TIME THE RELEASE
IS GIVEN.
3.6 Bylaws, Rules and Regulations. The Board on behalf of the Association shall
have the power to adopt, modify, and amend bylaws, rules and regulations governing the
Community, provided that such bylaws, rules and regulations shall not be inconsistent with
this Declaration and shall apply uniformly to all Owners, except as specifically provided
herein. The Board shall have the power to enforce the rules and regulations on behalf of the
Association and may prescribe penalties or fines for their violation. Any such bylaws, rules
and regulations shall become effective thirty (30) days after promulgation and shall be mailed
to all Owners prior to their effective date. A copy of the bylaws, rules and regulations then in
force shall be retained by the secretary of the Association. The Declarant on behalf of the
Board may adopt the initial bylaws, rules and regulations.
ARTICLE 4
ASSESSMENTS
4.1 Purpose of Assessment. The assessments provided for herein shall be used
for the general purposes of promoting the recreation, health, safety, welfare, common benefit,
and enjoyment of the Owners and occupants of Lots, including the maintenance of real and
personal property, all as may be more specifically authorized from time to time by the Board
of Directors.
4.2 Creation of the Lien and Personal Oblization for Assessments. Each
Owner of any Lot, by acceptance of a deed therefor, whether or not it shall be so expressed in
such deed, covenants and agrees to pay to the Association: (i) annual assessments or charges;
(ii) special assessments, such assessments to be established and collected as hereinafter
provided; and (iii) specific assessments established pursuant to the terms of this Declaration,
including, but not limited to, reasonable fines imposed in accordance with the terms of this
Declaration.
4.2.1 All such assessments, together with (i) late charges, (ii) interest set by
the Board, not to exceed the maximum rate permitted by law (but not to exceed eighteen
percent (18%) per annum), and (iii) costs, including, without limitation, reasonable attorneys'
fees actually incurred, shall be a charge on the land and shall be a continuing lien upon the Lot
against which each assessment is made.
4.2.2 Each such assessment, together with late charges, interest, costs,
including, without limitation, reasonable attorneys' fees actually incurred, shall also be the
8
0 i
personal obligation of the person who was the Owner of such Lot at the time the asscssrncnt
1'ell due. Each Owner shall be personally liable for the portion of each assessment coming due
while the Owner of a Lot, and each grantee of an Owner shall be jointly and severally liable
for such portion thereof as may be due and payable at the tintc of conveyance; provided,
however, the liability of a grantee for the unpaid assessments of its grantor shall not apply to
any first Mortgagee taking, title through foreclosure proceedings or deed in lieu of foreclosure.
4.2.3 The Association shall, within five (5) days after receiving a written
request therefor and for a reasonable charge, furnish a certificate signed by an officer of the
Association setting forth whether the assessments on a specified Lot have been paid. Such
certificate shall be binding upon the Association as of the date of issuance.
4.2.4 Annual assessments shall be levied equally on all Lots. Assessments
shall be paid in such manner and on such dates as may be fixed by the Board. Unless
otherwise provided by the Board, the assessment shall be paid in annual installments.
4.3 _Adoption of Budget. It shall be the duty of the Board to prepare and adopt a
budget covering the estimated costs of operating the Association during the coming year and
the assessments to be levied against each Lot, which may include an amount for capital
reserves in accordance with a capital budget separately prepared. The Board shall cause a
summary of the proposed operating and capital budgets and the proposed assessments against
each Lot for the following year to be mailed to each Owner. The Board shall set a date for a
special meeting of the Owners to consider ratification of the budget within thirty (30) days
after adoption by the Board and not less that fourteen (14) nor more than sixty (60) days after
the mailing of the proposed budgets and assessments. Unless at such meeting the budget is
rejected by at least seventy-five percent (75%) of the Total Association Vote, in person or by
proxy, the budget shall be ratified, whether or not a quorum is present. In the event the
proposed budget is rejected or the required notice is not given, the budget in effect for the then
current year shall continue in effect until the Owners ratify a subsequent budget.
4.4 Revised Budget. If the financial circumstances or needs of the Association
materially change during any year, the Board may prepare and adopt a revised budget and
assessments for the balance of the year. The Board shall cause a summary of the proposed
revised budget and assessments to be mailed to each Owner and shall set a date for a meeting
of the Owners to consider ratification of the revised budget and assessments in the same
manner as the regular annual budget as set forth in Section 4.3 above.
4.5 Special Assessments. in addition to the other assessments authorized herein,
the Association may levy special assessments for expenses such as, but not limited to, capital
improvements from time to time if approved at a meeting by two-thirds (213) of the Total
Association Vote. Special assessments shall be paid as determined by the Board, and the
Board may permit special assessments to be paid in installments extending beyond the fiscal
year in which the special assessment is imposed.
4.6 Lien for Assessments. All sums assessed against any Lot pursuant to this
Declaration, together with late charges, interest, costs, including, without limitation,
9
reasonable attorneys- fees actually incurred. as provided herein. shall be secured by a lien on
such Lot in favor of the Association. Such lien shall be superior to all other liens and
encumbrances on such Lot, except for (a) liens for ad valorem taxes, or (b) liens fin- all sums
unpaid on a first Mortgage or on any Mortgage to Declarant duly recorded in the records of
King County and all amounts advanced pursuant to such Mortgage and secured thereby in
accordance with the terms of such instrument. All other Persons acquiring liens or
encumbrances on any Lot after the recording of this Declaration shall be deemed to consent
that such liens or encumbrances shall be inferior to future liens for assessments, as provided
herein, whether or not prior consent is specifically set forth in the instruments creating such
liens or encumbrances.
4.7 Effect of Nonpayment of Assessments, Remedies of the Association. Any
assessment or installment thereof delinquent for a period of more than ten (10) days shall
incur a late charge in an amount as the Board may from time to time determine. The
Association shall cause a notice of delinquency to be given to any member who has not paid
within ten (10) days following the due date. If the assessment is not paid within thirty (30)
days, a lien, as herein provided, shall attach and, in addition, the lien shall include interest set
by the Board from time to time, on the principal amount due, late charges, costs of collection,
including, without limitation, reasonable attorneys' fees actually incurred, and any other
amounts provided or permitted by law.
4.7.1 In the event that the assessment remains unpaid after sixty (60) days,
the Association may, as the Board shall determine, institute suit to collect such amounts
and/or to foreclose its lien. Each Owner, by acceptance of a deed or as a party to any other
type of conveyance, vests in the Association or its agents the right and power to bring all
actions against such Owner personally, for the collection of such charges as a debt or to
foreclose the aforesaid lien in the same manner as other liens for the improvement of real
property.
4.7.2 The lien provided for in this Article shall be in favor of the Association
and shall be for the benefit of all other Owners. The Association, acting on behalf of the
Owners, shall have the power to bid on the Lot at any foreclosure sale or to acquire, hold,
lease, mortgage, or convey the same.
4.7.3 No Owner may waive or otherwise exempt himself from liability for
the assessments provided for herein, including, by way of illustration, but not limitation,
abandonment of the Lot.
4.7.4 All payments shall be applied first to costs, then to late charges, then to
interest and then to delinquent assessments.
4.8 Suspension for Nonpayment of Assessment. If an Owner shall be in arrears
in the payment of any assessment due, or shall otherwise be in default of the performance of
any terns of the Governing Documents of the Association for a period of thirty (30) days, said
Owner's voting rights shall, without the necessity ofany further action by the Association, be
10
0 9
suspended (except as against foreclosing secured parties) and shall remain suspended until all
payments, including interest thereon, are brought current and any other default is remedied.
No Owner is relieved of liability for assessments by non-use of the Common Areas or by
abandonment of a Lot.
4.9 Date of Commencement of Assessments. The assessments provided for
herein shall commence as to a Lot subject to this Declaration on the first day of the month
following conveyance of such Lot to a Person other than Declarant.
4.10 Specific Assessments. In addition to the general and special assessments
outlined above, the Board shall have the power to levy such specific assessments pursuant to
this Section 4.10 as, in its discretion, it shall deem appropriate. All other terms and conditions
of this Article 4 relating to general and special assessments shall apply to the levy and
collection of the specific assessments covered hereby and the Association shall have all
powers and remedies for collection and enforcement of such assessments as are applicable to
the general and special assessments set forth above. Fines levied pursuant to Section 11.1 of
this Declaration and the costs of maintenance performed by the Association for which the
Owner is responsible under Sections 5.3 and 5.4 of this Declaration shall be specific
assessments.
4.11 Common Areas Exempt. The Common Areas shall be exempt fi-om
assessments by the Association.
4.12 Capitalization of Association. Upon acquisition of record title to a Lot
by the first Owner thereof other than Declarant, a contribution shall be made by the first
Owner to the working capital of the Association in an amount equal to
Dollars (S ). This amount shall be in addition to, not in lieu of, the annual assessment
and shall not be considered advance payment of such assessment. This amount shall be
deposited into the purchase and sales escrow and disbursed therefrom to the Association for
use in covering operating expenses and other expenses incurred by the Association pursuant to
this Declaration and the Bylaws.
ARTICLE 5
MAINTENANCE• CONVEYANCE OF COMMON AREAS TO ASSOCIATION
5.1 Association's Responsibility. The Association shall maintain and keep in
good repair the Common Areas described in Article 2 herein and any Common Areas acquired
by the Association in the future. If the streetlights are installed and there is no procedure for
billing individual lot owners then the Association shall pay the bills for the streetlights. The
Association shall also maintain all other facilities serving the Community not dedicated to or
maintained by a public entity. The foregoing maintenance shall be performed consistent with
the Community -Wide Standard.
5.2 Property Not Owned by Association. The Association shall have the right,
but not the obligation, to maintain other property, whether or not owned by the Association
It
and whether within or N ithout the Community_ where the Board has determined that such
maintenance would benefit all Owners. lInseri sliecial maintenance requirement such as:
Tract R is a Private Access Tract owncd and marrnturnect by the Oi� per's of Lots 17, 18, 19 uric!
0, Tract C is a Private Access Tract oirne(l unit n wiwainnetl hi! the Owners of Lots 14, 15 uncl
16. In the event Tracts B and C erre not nutintained by such Lot Owners, the Association shall
have the right, but not the obligation, to maintain Tracts B and C at .such Lot Owners exj)ense
1mr'strcnrt to the procedure in Section 5.4 halo► J Without limitation of the foregoing, the
Association may enter into a joint maintenance agreement with adjoining property owners or
associations for the repair, maintenance and replacement of any shared facilities or other
property.
5.3 Damage Caused by Owner. In the event that the Association determines that
the need for maintenance, repair, or replacement, which is the responsibility of the
Association hereunder, is caused through the willful or negligent act of an Owner, or the
family, guests, lessees, or invitees of any Owner, the Association may perform such
maintenance, repair or replacement at such Owner's sole cost and expense, and all costs
thereof shall be added to and become a part of the assessment to which such Owner is subject
and shall become a lien against the Lot of such Owner.
5.4 Owner's Responsibility. Except as provided in Sections 5.1, 5.2 and 5.3
above, all maintenance of any Lot and all structures, parking areas, landscaping, and other
improvements thereon together with the landscaping and trees on any parking strip fronting
any such Lot, shall be the sole responsibility of the Owner thereof, who shall provide
maintenance consistent with the Community -Wide Standard and this Declaration. The
perimeter fencing, if any, shall be maintained and repaired, in uniform appearance, by the
abutting lot owners. In the event that the Board of Directors of the Association determines that
any Owner has failed or refused to discharge properly any of such Owner's obligations with
regard to the maintenance, repair, or replacement of items for which such Owner is
responsible hereunder, the Association shall, except in an emergency situation, give the
Owner written notice of the Association's intent to provide such necessary maintenance,
repair, or replacement at the Owner's sole cost and expense. The notice shall set forth with
reasonable particularity the maintenance, repairs, or replacement deemed necessary. The
Owner shall have ten (10) days after receipt of such notice within which to complete such
maintenance, repair, or replacement, or, in the event that such maintenance, repair, or
replacement is not capable of completion within a ten (10) day period, to commence such
work which shall be completed within a reasonable time. If any Owner does not comply with
the provisions hereof, the Association may provide any such maintenance, repair, or
replacement at such Owner's sole cost and expense, and all costs shall be added to and
become a part of the assessment to which such Owner is subject and shall become a lien
against the Lot.
5.5 Conveyance_ of Common Areas by Declarant to Association. During the
Development Period, the Declarant may transfer or convey the Common ^Areas to the
Association, including any personal property and any improved or unimproved real property,
leasehold, casement, or other property interest. Such conveyance shall be accepted by the
Association, and the property shall thereafter be Common Areas to be maintained by the
12
9
Association. The Common Areas are subject to an casement of common use and enjoyment
in favor of the Association and every ONvner. their heirs, successors and assigns in accordance
with the terms and conditions of the Governing Documents. Such rights to use the Common
Areas are appurtenant to and shall not be separated from ownership of any Lot and shall not
be assigned or conveyed by any Lot Owner in any way except upon the transfer of title to such
Lot, and then only to the transferee of such title and shall be deemed so conveyed whether or
not it shall be so expressed in the deed or other instrument conveying title. Certain rights of
use, ingress, egress, occupation, and management authority in the Common Areas set forth
elsewhere in this Declaration shall be reserved to Declarant for the duration of the
Development Period. Declarant shall not be required to make any improvements whatsoever
to property to be conveyed and accepted pursuant to this Section.
5.6 Further Restrictions on Common Areas. If any Common Area is currently
owned or is acquired in the future which is designated as a steep slope, as a wetland, as a
buffer, as a native growth protection area or as any other type of sensitive area, then use of
such Common Area shall be limited to activities approved by the municipality which
designated such Common Area as sensitive. Notwithstanding the provisions in this Article 5,
or in Section 10.1 below, or in any other provision of this Declaration, there shall be no right or
casement of ingress and egress, use and enjoyment in or to such Common Area. Access shall be
limited to maintenance activities approved by the municipality.
ARTICLE 6
USE RESTRICTIONS AND RULES
6.1. General/Rules and Regulations. This Article, beginning at Section 6.2, sets
out certain use restrictions which must be complied with by all Owners and Occupants. These
use restrictions may only be amended in the manner provided in Section 11.3 hereof regarding
amendment of this Declaration. In addition, the Board may, from time to time, without
consent of the Owners, promulgate, modify, or delete other use restrictions and rules and
regulations applicable to the Community. Such use restrictions and rules shall be distributed
to all Owners and Occupants prior to the date that they are to become effective and shall
thereafter be binding upon all Owners and Occupants until and unless overruled, canceled, or
modified in a regular or special meeting by a majority of the Total Association Vote and the
consent of Declarant during the Development Period.
6.2 Residential Use. Except as provided in this Section, all Lots shall be used for
single-family residential purposes exclusively with the exception that certain home
occupations may be permitted, subject to the guidelines and rules established by the Board, if
any, and subject to approval by the Board. Such home occupations may be limited to certain
business uses, shall not create any disturbance, noise, or unsightliness, shall not unduly
increase traffic flow or parking congestion, and shall not be in violation of any of the
provisions of the Governing Documents. Use of the Lots shall in all cases be in compliance
with all applicable laws, ordinances, rules and regulations.
13
0 9
6.3 Buildin14 and Landscaping Requirements and Restrictions. Except as
provided in Section 6.4 heloN.v, all residences constructed vothin the Community by any
Person shall be subject to design review, and approval by the ACC \which may cover the
minimum size, architectural style, height, scope of improvements, quality of design, materials,
workmanship, and siting standards. Without restricting or limiting the authority of the ACC
pursuant to Section 3.5 in approving or disapproving of any specific proposal, the following
restrictions shall apply to the Community in general:
6.3.1 Only one Single Family home shall be permitted on each Lot. Two
story or split level homes shall include no less than 1,300 gross square feet of living space,
exclusive of one-story open porches and garages. One story homes shall include no less than
1,000 gross square feet of living space, exclusive of one-story open porches and garages.
6.3.2 After Declarant has completed construction of all houses in the
Community, any remodeling or exterior addition to any residence or other structure erected or
placed on any Lot shall be completed as to external appearance, including finished painting,
within six (6) months after the date of commencement of construction. All front, side and rear
yard landscaping must be completed within six (6) months from the date of closing of the
purchase of the residence by the Owner from the Declarant. In the event that strict
enforcement of this provision would cause undue hardship due to weather conditions, this
provision may be extended for a reasonable length of time when approved by the ACC.
6.3.3 All homes within the Community shall contain a garage; carports shall
not be permitted. Unless otherwise approved by the ACC, all garages must be attached to, or
incorporated in and made a part of, the residence constructed upon a Lot. In granting waivers
to this requirement, the ACC will consider functional necessity and architectural desirability.
6.3.4 All driveways and parking areas shall be paved with material approved
by the ACC.
6.3.5 No fence, fencing -type barrier, or hedge of any kind in excess of six (6)
feet high or extending into the front yard of any residence shall be erected, allowed or
maintained upon any Lot, without the prior written consent of the ACC. All fences shall be
constructed of wood material unless approved by the ACC. Any such fence, barrier, row of
trees, or hedge shall be strictly in compliance with Design Guidelines, if any, established by
the ACC, which standards may provide for limited acceptable styles and/or specifications.
6.3.6 Each home constructed on a Lot shall be built of new materials except,
with approval of the ACC, decorative items such as used brick, weathered planking, and
similar items. All visible masonry shall be native stone, brick or stucco. Types and colors of
exterior paint and stain must be submitted to the committee for approval. Any change to the
exterior color of any improvement located on a Lot, including, without limitation, the
dwelling, must be approved by the ACC.
6.3.7 All roofs on dwellings and garages shall be of composite, tile or cedar
shake and shall have a minimum pitch of four/twelve.
14
0 0
6.3.8 No owner shall grade, fill or otherwise alter the slope or contour of any
Lot, construct or alter the drainage patterns initially installed and constructed by Declarant or
a Residential Developer, or as established by the grading and natural course of surface and
subsurface water run-off without first obtaining i) recommendations from a soils engineer or
civil engineer, as appropriate, duly licensed by the State of Washington, ii) any and all
necessary governmental approvals and pen -nits and iii) written approval of the ACC, if any.
No Owner shall perform any such work except in conformance with the recommendations,
plans and specifications of such engineer.
6.4 Existing Residence. Intentionally omitted.
6.5 Signs. No sign of any kind shall be erected by an Owner or Occupant within
the Community without the prior written consent of the ACC. Notwithstanding the foregoing,
the Board and the Declarant shall have the right to erect reasonable and appropriate signs
including, without limitation, signs related to Declarant's development and marketing of
residences within the Community. In addition, "For Sale" signs and security signs consistent
with the Community -Wide Standard and any signs required by legal proceedings may be
erected upon any Lot.
6.6 Vehicles. The term "vehicles" as used herein shall include, without limitation,
automobiles; vans, campers, trucks, buses, motor homes, mobile homes, boats, jet skis,
trailers, portable aircraft, motorcycles, snowmobiles, mini -bikes, scooters, go-carts, dune
buggies and any other towed or self propelled transportation type vehicle. The teen
'.passenger vehicles" as used herein shall include passenger automobiles, vans, small trucks,
motorcycles, and similar type vehicles used regularly and primarily as transportation for the
Occupants of the Lot. Vehicles used for commercial and recreational purposes are not
considered passenger vehicles. "Parking areas" shall refer to the number of garage parking
spaces and driveway areas in front of garages. However, driveway areas shall be considered
"parking areas"' for passenger vehicles only.
6.6.1 No vehicles other than passenger vehicles in regular use may be parked
on any Lot or portion of the Community, except in parking areas on Lots, or in a screened area
on a Lot, if such screened area is approved by the ACC. Any vehicle regularly parked in an
unapproved area or for longer than twenty-four (24) consecutive hours shall be considered a
nuisance and may be removed from the Community.
6.6.2 No passenger vehicles may be parked on any Lot or portion of the
Community except in "parking areas" as defined in this Section.
6.6.3 Any passenger vehicle which is inoperable or unlicensed and not
capable of use on the public highways and which is parked on any parking area for a period of
more than forty-eight (48) hours shall be treated the same as a non -passenger vehicle and shall
be considered a nuisance and may be removed from the Community.
15
6.6.4 The Board may adopt and maintain current rules and regulations
concerning the parking an(] storage of vehicles on any Lot or any portion of the Community.
Said rules are to protect the Community from the potentially adverse impacts of vehicles on
the Community environment and to accommodate the evolvino. nature and use of such
vehicles. Such rules and regulations may provide for exceptions and/or modifications to the
conditions of this Section as determined in the sole discretion of the Board. The Board shall
rule on any dispute as to the interpretation or application of this Section and all rules and
regulations established by the Board with respect to vehicles.
6.6.5 Off-street parking for at least three (3) passenger vehicles shall be
provided on each Lot. Covered enclosed parking shall be provided for one (1) or more
passenger vehicles, plus a driveway for at least two (2) additional passenger vehicles, unless
approved by the ACC.
6.7 Vehicles on Common Areas. No motorized vehicles shall be permitted on
pathways or unpaved Common Areas except vehicles being used for the limited purpose of
operating and maintaining utilities.
6.8 Leasinu. Lots may be leased for residential purposes. All leases shall have a
minimum term of at least three (3) months. All leases shall require, without limitation, that the
tenant acknowledge receipt of a copy of the Declaration, Bylaws, and rules and regulations of
the Association.
6.9 Occupants_ Bound. All provisions of the Declaration, Bylaws, and of any
rules and regulations, which govern the conduct of Owners and which provide for sanctions
against Owners shall also apply to all Occupants. Pines may be levied against Owners or
Occupants. If a fine is first levied against an Occupant and is not paid timely, the fine may
then be levied against the Owner.
6.10 Animals. No animals, livestock or poultry of any kind shall be raised, bred or
kept in the Community; provided, however, that conventional household pets may be kept on
a Lot subject to the following restrictions: Pets shall not be kept, bred or maintained for any
commercial purposes. Owners shall be responsible for the immediate clean up and removal of
all fecal matter deposited by pets on any property other than the Lot of the Owner of the pet.
Pets shall be confined in the Owner's Lot unless on a leash and accompanied by a responsible
person. No domestic pet may be kept if it is a source of annoyance or a nuisance. The Board
shall have the authority to determine whether a particular pet is a nuisance or a source of
annoyance, and such determination shall be final and conclusive. Pets shall be attended at all
times and shall be registered, licensed and inoculated from time to time as required by law.
6.11 Mining Prohibited. No portion of the Community shall be used for the
purpose of boring, mining, quarrying, or exploring for or removing oil or other hydrocarbons,
minerals, gravel, or earth.
6.12 Nuisance. Each Owner and Occupant shall prevent the development of any
unclean, unhealthy, unsightly, or unkempt condition on his or her Lot. No Lot shall be used,
16
0 0
in whole or in part, for the storage of any property or thing that will cause such Lot to appear
to be in an unclean or untidy condition; nor shall any substance, thing, or material be kept that
Will emit find or obnoxious odors or that will cause any noise or other condition that Will or
might disturb the peace, quiet. safety, comfort, or serenity of the occupants of surrounding
property. No illegal. illicit, noxious or offensive activity shall be carried on within the
Community, nor shall anything be done tending to cause embarrassment, discomfort,
annoyance, or nuisance to any Person using any property within the Community. Without
limiting the generality of the foregoing, no speaker, horn, whistle, siren, bell, amplifier or
other sound device, except such devices as may be used exclusively for security purposes,
shall be located, installed or maintained upon the exterior of any Lot unless required by law or
unless specifically approved by the ACC.
6.13 Unsightly or Unkempt Conditions. The pursuit of hobbies or other activities,
including specifically, without limiting the generality of the foregoing, the assembly of and
disassembly of motor vehicles and other mechanical devices, which might tend to cause
disorderly, unsightly, or unkempt conditions, shall not be undertaken outside of homes or
garages. Garage doors shall be kept closed at all times unless they are in use. In addition, the
storage of equipment, machinery, construction supplies or any similar material on a Lot
outside of the home and garage constructed thereon is strictly prohibited except as required
during the remodeling or refurbishing of improvements on such Lot and then for not more
than sixty (60) days.
6.14 Antennas. No outside radio antenna, television antenna, microwave or
satellite dish, aerial, or other such device (collectively "Antennas") with a diameter or
diagonal measurement in excess of one meter shall be erected, constructed or placed on any
Lot. Reasonable restrictions which comply with Federal, State and local laws and do not
significantly increase the cost of the Antenna system or significantly decrease its efficiency or
performance may be imposed by the ACC on Antennas with a diameter or diagonal
measurement of one meter or less.
6.15 No Obstruction of Easements. Catch basins and drainage areas are for the
purpose of natural flow of water only. No obstructions or debris shall be placed in these
areas. No Owner or Occupant may obstruct or re -channel the drainage flows after location
and installation of drainage swales, storm sewers or storm drains. Declarant hereby reserves
for the benefit of Declarant and the Association and their respective successors and assigns a
perpetual easement across all Common Areas and Lots for the purpose of maintaining or
altering drainage and water flow. No structure, planting, or other material shall be placed or
permitted to remain upon any easement which may damage or interfere with the installation
and maintenance of any utilities, unless approved by the Board prior to installation. At no
time shall any access easements be blocked.
6.16 Sight Distance at Intersections. All property located at street intersections
shall be landscaped so as to permit safe sight across the street corners. No fence, wall, hedge
17
or shrub planting shall be placed or permitted to remain where it would create a traffic or sight
problem as determined by the ACC in its sole discretion.
6.17 Garbage Cans Woodpiles, Etc. All garbage cans, woodpiles, air-
conditioning compressors, machinery, equipment and other similar items related to the
operation of the residence shall be located or screened so as to be concealed from view from
the street abutting the Lot on which such items are located. All rubbish, trash, and garbage
shall be regularly removed and shall not be allowed to accumulate. Trash, garbage, debris, or
other waste matter of any kind may not be burned within the Community.
6.18 Subdivision of Lot. No Lot shall be subdivided or its boundary lines changed
except with the prior written approval of the ACC. Declarant, however, hereby expressly
reserves the right to re -plat any Lot or Lots owned by Declarant. Any such division, boundary
line change, or re -platting shall not be in violation of the applicable subdivision and zoning
regulations.
6.14 Guns. The use of firearms in the Community is prohibited. The term
"firearms" includes without limitation BB guns, pellet guns, and firearms of all types.
6.20 Utilities. Except as may be permitted by the ACC, no overhead utility lines,
including lines for cable television, shall be permitted within the Community, except for
temporary lines as required during construction and except as such lines exist upon recording
of the plat of the Community or as required by utilities serving the Community.
6.21 Liphtin . No colored lights (except holiday displays and yellow insect type
lights) shall be permitted at any location within the Community. All exterior fixtures that are
attached to the home shall be of compatible design and materials of the home. Any post
mounted exterior fixtures shall be of compatible design and materials as the fixtures attached
to the home. No fixtures which illuminate and excessively glare onto any other Lot shall be
permitted, and all exterior lights shall be screened to minimize impacts of light and glare. No
unshielded spot/floodlight fixtures are permitted.
6.22 Artificial Vegetation, Exterior Sculpture, and Similar Items. No artificial
vegetation, exterior sculpture, fountains, and similar items shall be permitted in the front yard
of any Lot unless approved by the ACC.
6.23 Mailboxes. All mailboxes located on Lots shall be of a style approved by the
ACC. Mailboxes shall be attached only to stands provided and maintained by the Association
in designated locations.
6.24 Clotheslines. No exterior clotheslines of any type shall be permitted upon any
Lot unless entirely screened from view from other Lots.
6.25 Exterior Security Devices. No exterior security devices, including, without
limitation, window bars, shall be permitted on any residence or Lot. Signs placed on the Lot
or the exterior of the residence stating that such residence is protected by a security system are
permissible.
6.26 Construction and Sale Period. So tong as Declarant owns any property in the
Community for development and/or sale, the restrictions set forth in this Article 6 shall not be
applied or interpreted so as to prevent, hinder or interfere with development, construction and
sales activities of Declarant or any builder or developer approved by Declarant.
ARTICLE 7
INSURANCE AND CASUALTY LOSSES
7.1 Insurance Coverage. The Board of Directors or the duly authorized agent of
the Association shall have the authority to and shall obtain or cause to be obtained insurance
as follows:
7.1.1 The Board shall obtain insurance on all insurable buildings and, where
the Board deems there to be a reasonable risk, other substantial structures whether or not such
buildings or structures are located on the Common Areas and which the Association is
obligated to maintain. Insurance on buildings shall provide, at minimum, fire and extended
coverage, including vandalism and malicious mischief; and shall be in an amount sufficient to
cover the full replacement cost of any repair or reconstruction in the event of damage or
destruction from any such hazard. Insurance on other substantial structures shall cover those
risks deemed advisable by the Board and shall be in such amounts as are deemed advisable by
the Board. The Board may insure other types of improvements, including entry monuments,
landscaping, and the like, as it deerns advisable. With respect to such other improvements,
the Board shall determine the risks to be insured and the amounts of insurance to be carried.
7.1.2 The Board shall obtain a public liability policy applicable to the
Common Areas covering the Association and its members for all damage or injury caused by
the negligence of the Association or any of its members or agents, and, if reasonably available,
directors' and officers' liability insurance. The public liability policy shall have a combined
single limit of at least One Million Dollars ($1,000,000.00) unless otherwise determined by
the Board.
7.1.3 The Board is hereby authorized to contract with or otherwise arrange to
obtain the insurance coverage required hereunder through the Declarant and to reimburse
Declarant for the cost thereof, and Declarant shall be authorized, but not obligated, to
purchase such insurance coverage for the benefit of the Association and the Owners upon
Declarant and the Association agreeing upon the terms and conditions applicable to
reimbursement by the Association for costs incurred by Declarant in obtaining such coverage.
Notwithstanding anything contained in this Declaration to the contrary, the Board shall not be
required to comply with the provisions of this Article if the Board has contracted for or
otherwise arranged to obtain the required insurance coverage through the Declarant.
19
i 0
7.1.4 Premiums for all insurance shall be common expenses of the
Association. The policies may contain a reasonable deductible, and the amount thereof shall
not be subtracted from the lace amount of the policy in determining whether the insurance at
least equals the full replacement cost.
7.1.5 In the event insurance premiums in connection with the insurance
required by this Article 7 become prohibitively expensive, in the judgment of the Board, the
Board may with approval of seventy-five percent (75%) of the Total Association Vote reduce
the amount of the required insurance, self -insure itself,, or discontinue the insurance all
together.
7.2 Policy Requirements. All such insurance coverage obtained by the Board of
Directors shall be written in the name of the Association, as trustee for the respective
benefited parties. Such insurance shall be governed by the provisions hereinafter set forth:
7.2.1 All policies shall be written with a company authorized to do business
in Washington.
7.2.2 Exclusive authority to adjust losses under policies obtained by the
Association shall be vested in the Association's Board of Directors; provided, however, no
Mortgagee having an interest in such losses may be prohibited from participating in the
settlement negotiations, if any, related thereto.
7.2.3 In no event shall the insurance coverage obtained and maintained by the
Association's Board of Directors hereunder be brought into contribution with insurance
purchased by individual Owners, occupants, or their Mortgagees, and the insurance carried by
the Association shall be primary.
7.2.4 All casualty insurance policies shall have an inflation guard
endorsement and an agreed amount endorsement if these are reasonably available and all
insurance policies shall be reviewed annually by one or more qualified persons, at least one of
whom must be in the real estate industry and familiar with construction in the City of Renton.
7.3 Other Insurance. In addition to the other insurance required by this Article 7,
the Board shall obtain worker's compensation insurance, if and to the extent necessary to
satisfy the requirements of applicable laws. The Board may, in its discretion, obtain a fidelity
bond or bonds on directors, officers, employees, and other persons handling or responsible for
the Association's funds, if reasonably available. The Association shall obtain additional
insurance coverage, if and to the extent necessary to satisfy the requirements of the Federal
Home Loan Mortgage Corporation, the Federal National Mortgage Association, the U.S.
Department of Veterans Affairs, or the U.S. Department of Housing and Urban Development.
7.4 Individual Insurance. By virtue of taking title to a Lot subject to the terms of
this Declaration, each Owner acknowledges that the Association has no obligation to provide
any insurance for any portion of individual Lots, and each Owner covenants and agrees with
all other Owners and with the Association that each Owner shall at a minimum, carry fire and
20
0
extended coverage casualty insurance on the Lot and all structures constructed thereon in an
amount sufficient to cover the full replacement costs of any repair or reconstruction in the
event of damage or destruction from any such hazard.
7.5 Damage and Destruction — Insured by Association.
7.5.1 Immediately after damage or destruction by fire or other casualty to all
or any portion of any improvement covered by insurance written in the name of the
Association, the Board of Directors or its duly authorized agent shall proceed with the filing
and adjustment of all claims arising under such insurance and obtain reliable and detailed
estimates of the cost of repair or reconstruction of the damaged or destroyed property. Repair
or reconstruction, as used in this Section, means repairing or restoring the property to
substantially the same condition and location that existed prior to the fire or other casualty,
allowing for any changes or improvements necessitated by changes in applicable building
codes. The Board of Directors shall have the enforcement powers specified in this
Declaration necessary to enforce this provision.
7.5.2 Any damage or destruction to property covered by insurance written in
the name of the Association shall be repaired or reconstructed unless, within sixty (60) days
after the casualty, at least seventy-five percent (75%) of the Total Association Vote otherwise
agree. If for any reason either the amount of the insurance proceeds to be paid as a result of
such damage or destruction, or reliable and detailed estimates of the cost of repair or
reconstruction, or both, are not made available to the Association within such period, then the
period shall be extended until such information shall be made available; provided, however,
such extension shall not exceed sixty (60) days. No Mortgagee shall have the right to
participate in the determination of whether damage or destruction shall be repaired or
reconstructed.
7.5.3 If the damage or destruction for which the insurance proceeds are paid
is to be repaired or reconstructed and such proceeds are not sufficient to defray the cost
thereof, the Board of Directors shall, without the necessity of a vote of the Association's
members, levy a special assessment against all Owners in proportion to the number of Lots
owned by such Owners. Additional assessments may be made in like manner at any time
during or following the completion of any repair or reconstruction. If the funds available from
insurance exceed the costs of repair or reconstruction or if the improvements are not repaired
or reconstructed, such excess shall be deposited to the benefit of the Association.
7.5.4 In the event that it should be determined by the Association in the
manner described above that the damage or destruction shall not be repaired or reconstructed
and no alternative improvements are authorized, then and in that event the property shall be
restored to its natural state and maintained as an undeveloped portion of the Community by
the Association in a neat and attractive condition.
7.6 Damage and Destruction — Insured by Owners. The damage or destruction
by fire or other casualty to all or any portion of any improvement on a Lot shall be repaired by
the Owner thereof within seventy-five (75) days after such damage or destruction or, where
21
0 0
repairs cannot be completed within seventy-five (75) clays, they shall be commenced Avithin
such period and shall be completed within a reasonable time thereafter. Alternatively, the
Owner may elect to demolish all improvements on the Lot and remove all debris therefrom
within seventy-five (75) days after such damage or destruction. In the event of noncompliance
with this provision. the Board of Directors shall have all enforcement powers specified herein.
7.7 Insurance Deductible. The deductible for any casualty insurance policy
carried by the Association shall, in the event of damage or destruction, be allocated among the
Persons who are responsible hereunder, or be a common expense of the Association.
ARTICLE S
CONDEMNATION
In the event of a taking by eminent domain of any portion of the Common Areas on
which improvements have been constructed, then, unless within sixty (60) days after such
taking, at least seventy-five percent (75%) of the Total Association Vote shall otherwise
agree, the Association shall restore or replace such improvements so taken on the remaining
land included in the Common Areas to the extent lands are available therefor. The provisions
of Section 7.5, above, applicable to Common Areas improvements damage, shall govern
replacement or restoration and the actions to be taken in the event that the improvements are
not restored or replaced.
ARTICLE 9
MORTGAGEE PROVISIONS
The following provisions are for the benefit of holders of first Mortgages on Lots in
the Community. The provisions of this Article apply to both this Declaration and to the
Bylaws, notwithstanding any other provisions contained therein.
9.1 Notices of Action. An institutional holder, insurer, or guarantor of a first
Mortgage, who provides a written request to the Association (such request to state the name
and address of such holder, insurer, or guarantor and the Lot number, therefore becoming an
"eligible holder"), will be entitled to timely written report as to the current status of said Lot
with respect to the following:
9.1.1 Any condemnation loss or any casualty loss which affects a material
portion of the Community or which affects any Lot on which there is a first Mortgage held,
insured, or guaranteed by such eligible holder;
9.1.2 Any delinquency in the payment of assessments or charges owed by an
Owner of a Lot subject to the Mortgage of such eligible holder.
9.2 No Priority. No provision of this Declaration or the Bylaws gives or shall be
construed as giving any Owner or other party priority over any rights of the first Mortgagee of
22
0
any Lot in the case of distribution to such Owner of insurance proceeds or condemnation
awards for losses to or a taking of the Common Areas.
9.3 Notice to Association. Upon request, each Lot Owner shall be obligated to
furnish to the Association the name and address of the holder of any Mortgage encumbering
such Owncr's Lot.
9.4 VA/HUD Approval. As long as the Declarant has the right to appoint and
remove the directors of the Association and so long as the project is approved by the
U.S. Department of Housing and Urban Development ("HUD") for insuring or the
U.S. Department of Veterans Affairs (`VA") for guaranteeing any Mortgage in the
Community the following actions shall require the prior approval of the VA and/or HUD as
applicable: dedication of Common Areas to any public entity; mergers and consolidations;
dissolution of the Association, and material amendment of the Declaration, Bylaws or Articles
of Incorporation.
9.5 Applicability of Article 9. Nothing contained in this Article shall be
construed to reduce the percentage vote that must otherwise be obtained under the
Declaration, Bylaws, or Washington law for any of the acts set out in this Article.
9.6 Amendments by Board. Should the Federal National Mortgage Association,
the Federal Home Loan Mortgage Corporation, HUD or VA subsequently delete any of their
respective requirements which necessitate the provisions of this Article or make any such
requirements less stringent, the Board, without approval of the Owners, may cause an
amendment to this Article to be recorded to reflect such changes.
ARTICLE 10
EASEMENTS
10.1 Easements for Use and Enjoyment.
10.1.1 Every Owner of a Lot shall have a right and easement of ingress and
egress, use and enjoyment in and to the Common Areas which shall be appurtenant to and
shall pass with the title to each Lot, subject to the following provisions:
10.1.1.1 the right of the Association to charge reasonable fees for
the use of any portion of the Common Areas, to limit the number of guests of Lot
Owners and tenants who may use the Common Areas, and to provide for the exclusive
use and enjoyment of specific portions thereof at certain designated times by an
Owner, his family, tenants, guests, and invitees:
10.1.1.2 the right of the Association to suspend the voting rights
of an Owner and the right of an Owner to use certain Common Areas for any period
during which any assessment against such Owner's Lot remains unpaid;
23
10.1.1, ; the right of the Association to borrow money for the
purpose of improving the Common Areas, or any portion thereof, or for construction.
repairing or improving any facilities located or to be located thereon, and to give as
security for the payment of any such loan a Mortgage conveying all or any portion of
the Common Areas, provided, however, the lien and encumbrance of any such
Mortgage given by the Association shall be subject and subordinate to any rights,
interests, options, easements and privileges herein reserved or established for the
benefit of Declarant, or any Lot or Lot Owner, or the holder of any Mortgage,
irrespective of when executed, given by Declarant or any Lot Owner encumbering any
Lot or other property located within the Community; and
10.1.1.4 the right of the Association to dedicate or transfer all or
any portion of the Cornmon Areas subject to such conditions as may be agreed to by
the members of the Association. No such dedication or transfer shall be effective
unless an instrument agreeing to such dedication or transfer has been approved by the
affinnative vote of at least seventy-five percent (75%) of the Total Association Vote;
provided, however, that during the Development Period, Declarant may, on its sole
signature, dedicate or transfer portions of the Common Areas, so long as such transfer
or dedication does not materially and adversely affect the Association or any Lot
Owner.
10.1.2 Any Lot Owner may delegate such Owner's right of use and enjoyment
in and to the Common Areas and facilities located thereon to the members of such Owner's
family and to such Owner's tenants and guests and shall be deemed to have made a delegation
of all such rights to the Occupants of such Owner's Lot, if ]eased.
10.2 Easements for Utilities. There is hereby reserved to the Declarant, the
Association and any utility providers designated by either the Declarant or the Association
blanket easements upon, across, above and under all property within the Community for
access, ingress, egress, installation, repairing, replacing, and maintaining all utilities serving
the Community or any portion thereof, including, but not limited to, gas, water, sanitary
sewer, storm sewer, cable television, telephone and electricity. It shall be expressly
permissible for the Declarant, the Association, or the designee of either, as the case may be, to
install, repair, replace, and maintain or to authorize the installation, repairing, replacing, and
maintaining of such wires, conduits, cables and other equipment related to the providing of
any such utility or service. This easement shall be utilized so as to not unreasonably interfere
with improvements constructed upon any Lot and the building envelope for any unimproved
Lot. Should any party furnishing any such utility or service request a specific license or
easement by separate recordable document, the Board shall have the right to grant such
easement.
10.3 Easement for Maintenance. Declarant hereby expressly reserves a perpetual
easement for the benefit of the Association across such portions of the Community,
determined in the sole discretion of the Association, as are necessary to allow for the
maintenance required under Article 5. Such maintenance shall be performed with a minimum
of interference to the quiet enjoyment of Owner's property, reasonable steps shall be taken to
24
0 0
protect such property. and damage shall be repaired by the Person causing the damage at its
sole expense.
10.4 Easement for Entry Features. If Declarant installs an entry feature. there is
hereby reserved to the Declarant and the Association an easement for ingress. egress,
installation, construction, landscaping and maintenance of entry features and similar street-
scapes for the Community, as more fully described on the recorded subdivision plat for the
Community or any other recorded instrument, easement or conveyance. The easement and
right herein reserved shall include the right to cut, remove and plant trees, shrubbery, flowers
and other vegetation around such entry features and the right to grade the land under and
around such entry features.
10.5 Construction and Sale Period Easement. Notwithstanding any provisions
contained in this Declaration, the Bylaws, Articles of Incorporation, rules and regulations,
design guidelines, and any amendments thereto, so long as Declarant owns any property in the
Community for development and/or sale, Declarant reserves an easement across all
Community property for Declarant and any builder or developer approved by Declarant to
maintain and carry on, upon such portion of the Community as Declarant may reasonably
deem necessary, such facilities and activities as in the sole opinion of Declarant may be
required, convenient, or incidental to Declarant's and such builder's or developer's
development, construction, and sales activities related to property described above, including,
but without limitation: the right of access, ingress and egress for vehicular and pedestrian
traffic and construction activities over, under, on or in the Community, including, without
limitation, any Lot; the right to tie into any portion of the Community with driveways, parking
areas and walkways; the right to tie into and/or otherwise connect and use (without a tap -on or
any other fee for so doing), replace, relocate, maintain and repair any device which provides
utility or similar services including, without limitation, electrical, telephone, natural gas,
water, sewer and drainage lines and facilities constructed or installed in, on, under and/or over
the Community; the right to carry on sales and promotional activities in the Community; and
the right to construct and operate business offices, signs, construction trailers, model
residences, and sales offices. Declarant and any such builder or developer may use residences,
offices, or other buildings owned or leased by Declarant or such builder or developer as model
residences and sales offices. Rights exercised pursuant to such reserved easement shall be
exercised with a minimum of interference to the quiet enjoyment of affected property,
reasonable steps shall be taken to protect such property, and damage shall be repaired by the
Person causing the damage at its sole expense. During the Development Period, this Section
shall not be amended without the Declarant's express written consent.
10.6 Easement for Maintenance of Retaininp, Walls. There is hereby reserved to
all lot owners within the Community an easement for ingress and egress across the adjoining
lots for maintenance of any retaining wall and all structures therein.
25
0 0
ARTICLE 11
GENERAL PROVISIONS
11.1 Enforcement. Each Owner and Occupant shall comply strictly with the
Association's Bylaws. rules and regulations. the use restrictions. as they may be lawfully
amended or modified from time to time. and with the covenants, conditions, and restrictions
set forth in this Declaration and in the deed to such Owner's Lot, if any. After notice and an
opportunity to be heard by the Board of Directors or by a representative designated by the
Board, and in accordance with rules and regulations adopted by the Board, the Board may levy
reasonable fines for violations of the above (in addition to any late charges that may be
assessed in connection with the late payment of assessments or other Association charges) in
accordance with a previously established schedule adopted by the Board and furnished to the
Owners, which fines shall be collected as provided herein for the collection of assessments.
Failure to comply with this Declaration, the Bylaws or the rules and regulations shall be
grounds for an action to recover sums due for damages or injunctive relief, or both,
maintainable by the Board of Directors, on behalf of the Association, or, in a proper case, by
an aggrieved Owner. Failure by the Association or any Owner to enforce any of the foregoing
shall in no event be deemed a waiver of the right to do so thereafter.
11.2 Duration. This Declaration shall run with and bind the Community, and shall
inure to the benefit of and shall be enforceable by the Association or any Owner, their
respective legal representatives, heirs, successors, and assigns, perpetually to the extent
provided by law; provided, however, so long as and to the extent that Washington law limits
the period during which covenants restricting land to certain uses may run, any provisions of
this Declaration affected thereby shall run with and bind the land so long as permitted by such
law, after which time, any such provision shall be (a) automatically extended (to the extent
allowed by applicable law) for successive periods of ten (10) years, unless a written
instrument reflecting disapproval signed by the then Owners of at least seventy-five percent
(75%) of the Lots and the Declarant (so long as the Declarant owns any property for
development and/or sale in the Community) has been recorded within the year immediately
preceding the beginning of a ten (10) year renewal period agreeing to change such provisions,
in whole or in part, or to tenninate the same, in which case this Declaration shall be modified
or terminated to the extent specified therein; or (b) extended as otherwise provided by law.
Every purchaser or grantee of any interest (including, without limitation, a security interest) in
any real property subject to this Declaration, by acceptance of a deed or other conveyance
therefor, thereby agrees that such provisions of this Declaration may be extended and renewed
as provided in this Section.
11.3 Amendments.
11.3.1 This Declaration may be amended unilaterally at any time and from
time to time by Declarant (i) if such amendment is necessary to bring any provision hereof
into compliance with any applicable governmental statute, rule, or regulation or judicial
detennination which shall be in conflict therewith; (ii) if such amendment is necessary to
enable any title insurance company to issue title insurance coverage with respect to the Lots
subject to this Declaration; (iii) if such amendment is required by an institutional or
26
0 0
governmental lender or purchaser of mortgage loans. including. for example, the Federal
National Mortgage Association or Federal Home Loan Mortgage Corporation. to enable such
lender or purchaser to make or purchase Mortgage loans on the Lots sulliect to this
Declaration; or (iv) if such amendment is necessary to enable any governmental agency or
private insurance company to insure or guarantee Mortgage loans on the Lots subject to this
Declaration; provided, however, any such amendment shall not adversely affect the title to any
Owner's Lot unless any such Lot Owner shall consent thereto in writing. Further. so long as
Declarant owns any property for development and/or sale in the Community, Declarant may
unilaterally amend this Declaration for any other- purpose; provided, however, any such
amendment shall not materially adversely affect the substantive rights of any Lot Owners
hereunder, nor shall it adversely affect title to any Lot without the consent of the affected Lot
Owner.
11.3.2 This Declaration may also be amended upon the affirmative vote or
written consent, or any combination thereof, of the Owners of at least seventy-five percent
(75%) of the Total Association Vote and the consent of Declarant (so long as the Declarant
owns any property for development and/or sale in the Community). Amendments to this
Declaration shall becorne effective upon recordation, unless a later effective date is specified
therein.
11.4 Partition. The Common Areas shall remain undivided, and no Owner nor any
other Person shall bring any action for partition or division of the whole or any part thereof
without the written consent of all Owners of all portions of the property located within the
Community and without the written consent of all holders of all Mortgages encumbering any
portion of the property, including, but not necessarily limited to, the Lots located within the
Community.
11.5 Gender and Grammar. The singular, wherever used herein, shall be
construed to mean the plural, when applicable, and the use of the masculine pronoun shall
include the neuter and feminine.
11.6 Severability. Whenever possible, each provision of this Declaration shall be
interpreted in such manner as to be effective and valid, but if the application of any provision
of this Declaration to any person or to any property shall be prohibited or held invalid, such
prohibition or invalidity shall not affect any other provision or the application of any provision
which can be given effect without the invalid provision or application, and, to this end, the
provisions of this Declaration are declared to be severable.
11.7 Captions. The captions of each Article and Section hereof, as to the contents
of each Article and Section, are inserted only for convenience and are in no way to be
construed as defining, limiting, extending, or otherwise modifying or adding to the particular
Article or Section to which they refer.
11.8 Perpetuities. If any of the covenants, conditions, restrictions, or other
provisions of this Declaration shall be unlawful, void, or voidable for violation of the rule
against perpetuities, then such provisions shall continue only until twenty-one (2 1) years after
27
the death of the last survivor of the now-livin- descendants of the individuals signing this
Declaration.
11.9 Indemnification. To the fullest extent allowed by applicable Washington lay.
the Association shall indemnify every officer and director against any and all expenses,
including. without limitation, attorneys' fees, imposed upon or reasonably incurred by any
officer or director in connection with any action, suit, or other proceeding (including
settlement of any suit or proceeding, if approved by the then Board of Directors) to which
such officer or director may be a party by reason of being or having been an officer or director.
The officers and directors shall not be liable for any mistake of judgment, negligent or
otherwise, except for their own individual willful misfeasance, malfeasance, misconduct, or
bad faith. The officers and directors shall have no personal liability with respect to any
contract or other commitment made by them, in good faith, on behalf of the Association
(except to the extent that such officers or directors may also be members of the Association),
and the Association shall indemnify and forever hold each such officer and director free and
harmless against any and all liability to others on account of any such contract or commitment.
Any right to indemnification provided for herein shall not be exclusive of any other rights to
which any officer or director, or former officer or director, may be entitled. The Association
may, at the discretion of the Board, maintain adequate general liability and officers' and
directors' liability insurance to fund this obligation, if such coverage is reasonably available.
11.10 Books and Records. This Declaration, the Articles of Incorporation, the
Bylaws, copies of rules and regulations, Design Guidelines, use restrictions, membership
register, books of account, and minutes of meetings of the members of the Board and of
committees shall be made available pursuant to reasonable procedures established by the
Board for inspection and copying by any member of the Association or by the duly appointed
representative of any member and by holders, insurers, or guarantors of any first Mortgage at
any reasonable time and for a purpose reasonably related to such Person's interest as a
member or holder, insurer, or guarantor of a first Mortgage at the office of the Association or
at such other reasonable place as the Board shall prescribe.
11.11 Financial Review. At least annually, the Board of Directors shall prepare, or
cause to be prepared, a financial statement of the Association. Upon written request of any
institutional holder of a first Mortgage and upon payment of all necessary costs, such holder
shall be entitled to receive a copy of such financial statement within ninety (90) days of the
date of the request.
11.12 Notice of Sale, Lease or Acquisition. In the event an Owner sells or leases
such Owner's Lot, the Owner shall give to the Association, in writing, prior to the effective
date of such sale or lease, the name of the purchaser or lessee of the Lot and such other
information as the Board may reasonably require. Upon acquisition of a Lot each new Owner
shall give the Association, in writing, the name and mailing address of the Owner and such
other information as the Board may reasonably require.
11.13 Agreements. Subjeet to the prior approval of Declarant (so long as Declarant
owns any property for development and/or sale in the Community or has the right to
28
0 i
unilaterally annex additional property to the Community) all agreements and determinations,
including settlement agreements regarding litigation involving the Association, la vfutly
authorized by the Board of Directors shall be binding upon all Owners, their heirs, legal
representatives, successors, assigns, and others having an interest in the Community or the
privilege of possession and enjoyment of any part of the Community.
11.14 I_mplied_ Rights. The Association may exercise any right or privilege given to
it expressly by this Declaration, the Bylaws, the Articles of Incorporation, any use restriction
or rule or regulation, and every other right or privilege reasonably to be implied from the
existence of any right or privilege given to it therein or reasonably necessary to effectuate any
such right or privilege.
11-15 Variances. Notwithstanding anything to the contrary contained herein, the
Board of Directors or its designee shall be authorized to grant individual variances from any
of the provisions of this Declaration, the Bylaws and any Design Guideline rule, regulation or
use restriction established pursuant thereto if it detennines that waiver of application or
enforcement of the provision in a particular case would not be inconsistent with the overall
scheme of development for the Community.
11.16 Litigation. No judicial or administrative proceeding shall be commenced or
prosecuted by the Association unless approved by at least seventy-five percent (75%) of the
Total Association Vote. This Section shall not apply, however, to (i) actions brought by the
Association to enforce the provisions of this Declaration (including, without limitation, the
foreclosure of liens), (ii) the imposition and collection of assessments as provided in Article 4
hereof, (iii) proceedings involving challenges to ad valorem taxation, or (iv) counterclaims
brought by the Association in proceedings instituted against it. This Section shall not be
amended unless such amendment is made by the Declarant pursuant to Section 11.3, hereof,
or is approved by the percentage votes, and pursuant to the same procedures, necessary to
institute proceedings as provided above.
EXECUTED this day of , 20_.
DECLARANT: Harbour Homes, LLC
Justin Harman
Vice President
29
9 0
State of Washington )
)ss.
County of King )
I certify that I know or have satisfactory evidence that Justin Hannan is the person who appeared
before me, and said person acknowledged that lie signed this instrument, on oath stated that he
was authorized to execute the instrument and acknowledged it as the Vice President of Harbour
Homes, LLC to be the free and voluntary act of such party for the uses and purposes mentioned
in the instrument.
(Seal Or Stamp) Dated:
Notary Public in and for the State of Washington
Residing at:
Printed Name:
My Appointment Expires
30
a
ow
DEPARTMENT OF I&IMUNITYCITY 0
AND ECONOMIC DEVELOPMENT menton '
AFFIDAVIT OF MAILING FOR A
NEIGHBORHOOD MEETING
Planning Division
1055 South Grady Way, Renton, WA 98057
Phone: 425-430-7200 1 www.rentonwa.g
STATE OF WASHINGTON
SS
COUNTY OF KING
*ty R .ray _ ----- being first duly
sworn on oath, deposes and says:
1. On the �. day of 20 1 L_, I deposited in the mails of the
United States, a sealed envelope containing a neighborhood meeting notice, pursuant
to Renton Municipal Code section 4-8-090A Neighborhood Meetings to property owners
within three hundred feet (300') of the property for the following project:
Project Name
$eve{lam .�t;��'� l Hnrhe�r 1�0'�,��. �-�-�•
Owner Name
2. This notice was sent to the addresses in the attached list, which was created based on
the most recent property tax assessment rolls of King County Department of
Assessments.
Sender Signature
SUBSCRIBED AND SWORN to before me this i 1 day of "' , 20 f �"
NOTARY PUBLIC in and for the State of Washington,
residing at s 5
My commission expires on
Notary Public
State of Washington
ANDREA L. ERICKSON
My Appointrnent Expires Jan 21, 2017
I
I /
DEPARTMENT OF 10WILINITY CITY OF
AND ECONOMIC DEVELOPMENT
nto6n
AFFIDAVIT OF POSTING MEETING
LOCATION SIGN FOR A
NEIGHBORHOOD MEETING
Planning Division
1055 South Grady Way, Renton, WA 98057
Phone: 425-430-7200 1 www.rentonwa•go�
STATE OF WASHINGTON
SS
COUNTY OF KING )
T being first duly
sworn on oath, deposes and says:
1. On the e'� day of 20 i I installed I Meeting
location sign(s) on the main entrance of the building located at
•,t, ;;. for the following. project:
Project Name
Owner Name
2. 1 have attached a copy of the meeting location sign(s).
3. This/these meeting location sign(s) was/were constructed and installed in locations in
conformance with the requirements of Chapter 8 Title 4 of Renton Municipal Code.
Installer Signature
SUBSCRIBED AND SWORN to before me this -7Y� day of
rt► ......0...�R '''•..
slow el..
�1OTARr
PUBLIC
20 IL
NOTARY PUBLIC in and for the State of Washington,
residing at Q, J., m
My commission expires on