Major Franchise Permit: MFP24003847
IVR Number: 24003847
Permit Information
Permit Name: Comcast Cable Franchise Permit
JB0001784351Address/Location:07/26/2024Application Date:0823059154Parcel Number: 652 SUNSET BLVD NE
Permit Type:09/06/2024Issue Date:Franchise
Permit Work Class:09/08/2025Expiration Date:Major Utility
Job Number: JB0001784351Franchise Type:Cable
Description: Comcast THIS PROJECT PROPOSES TO RE STRAP TWO RUNS OF FIBER 841' North along Sunset Blvd NE,
starting at Utility Pole located at (47.490922, 122.190464) parallel from east FOC. We plan to continue North on
Sunset Blvd NE with Re strap 144CT & 72CT fiber approximately 841', parallel from the east FOC to location
(47.492501, 122.190603). We plan to continue North on Sunset Blvd NE crossing the street from the east FOC to the
west FOC to location (47.493078, 122.190962).
Contacts
Name Address PhoneTypeBilling
Leah Ihlenfeldt
Cablecom LLC
1316 Bonneville Avenue
Snohomish, WA 98290
B: (360) 670-4291ApplicantX
Andrew Parker
comcast
410 Valley Ave NW
Puyallup, WA 98371
B: (253) 864-4249Contact
Joshua Ashley
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (503) 939-7931Contact
CABLECOM LLC 20021 120th Ave NE, #101
BOTHELL, WA 98011
B: (360) 668-1300Contractor
Business License Number: 52252Construction Contractor: CABLEL*971DP
Joshua Ashley
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (503) 939-7931Emergency
Contact
SUNSET VIEW APARTMENTS LLC 16825 160TH CT SE
RENTON , WA 98052
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
Cablecom LLC
Leah Ihlenfeldt 360-670-4291
1316 Bonneville Ave Snohomish, WA 98290
jb0001784351
652 sunset blvd ne
8/1/2024 8/3/2024 5pm9am
ER Project proposes to restrap two runs of fiber 841' north along sunset blvd
MFP24003847
Monday Friday 8:00am 3:00pm
Scott Warlick CED 9/6/2024
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Jessamin Santos
7/26/2024
TRAFFIC CONTROL - KEY MAPC-11SCALE: N.T.STHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OF529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY70ISSUE FOR PERMIT04/30/2024JEFFSHEET TC01-02SHEET TC02-03SHEET TC03-04SHEET TC04-05SHEET TC05-06MFP24003847
D/WD/WD/WD/WD/WFOCFOCSIDEWALKROWROWFOCFOCROWROWD/WSUNSET BLVD NE 30 MPH652 SUNSET BLVD NE,RENTON, WA 98056BLAINE CT NE 25 MPHWORK VEHICLE#07 (POLE)TC1-2TC2-3GENERAL NOTES:1.ALL "W" SERIES SIGNS SHALL BE 48" FLUORESCENTORANGE, UNLESS OTHERWISE NOTED.2.NIGHT WORK REQUIRES ADDITIONAL ROADWAYLIGHTING AT FLAGGING STATIONS.3.PEDESTRIAN SPOTTERS SHALL CONDUCTPEDESTRIAN TRAFFIC CONTROL AND ARE TOMAINTAIN OPEN SIDEWALKS AND ADA RAMPS.4.NOTIFY TRANSIT AUTHORITY FIVE DAYS PRIOR TOSTARTING WORK.5.ALL LANES SHOULD BE A MINIMUM OF 10' IN WIDTH ASMEASURED TO THE NEAR FACE OF THECHANNELIZING DEVICES.1000 FT.600 FT.550 FT.350 FT.250 FT.200 FT.150 FT. 6 7 8131321 935 MPH25 MPH30 MPH45 MPH50 MPH55+ MPH40 MPH125 FT.180 FT.245 FT.320 FT.540 FT.600 FT.1000 FT.25 FT.30 FT.35 FT.40 FT.45 FT.50 FT.55 FT.NO. OFCONESPER TAPERSPEEDAPPROACH(L)*LENGTHTAPERSPACING OF CONESALONG TAPERTAPER (FEET)SIGN SPACING (S)ADVANCE OF TAPER& BETWEEN SIGNS(*) NOTE - BASED ON 12-FOOT WIDE LANES.COLUMN IS ALSO APPROPRIATEFOR LANE WIDTHS LESS THAN 12 FEET.TABLEANOTE:INSTALL TEMPORARY NO PARKINGSIGNS 48 HOURS PRIOR TO START OFWORK.ACCESS TO DRIVEWAYS WILL BE GIVEN ATALL TIME DURING CONSTRUCTIONALL LANES SHOULD BE A MINIMUM OF 10' INWIDTH AS MEASURED TO THE NEAR FACEOF THE CHANNELIZING DEVICES.CONSTRUCTION WILL BE DONE WITHROLLING TRAFFIC CONTROL.ROADWORKAHEADW20-1SHOULDERWORKW21-5SSL/310'MINTRAFFIC CONTROLTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY70ISSUE FOR PERMIT04/30/2024JEFFTC1-22SCALE: 1:40MATCHLINE-SEE SHEET TC2-3MFP24003847
D/WD/WD/WD/WD/WD/WD/WD/WSIDEWALKFOCROWROWFOCFOCFOCROWROWSIDEWALKROWROWFOCFOCROWROW FOCFOCROWROW
CATVCATVCATVCATVCATVINTERSTATE 405 ON-RAMPSUNSET BLVD NE 30 MPH2105 NE 6TH CT,RENTON, WA 98056NE 6TH CT 25 MPHBLAINE CT NE 25 MPHTC2-3TC3-4GENERAL NOTES:1.ALL "W" SERIES SIGNS SHALL BE 48" FLUORESCENTORANGE, UNLESS OTHERWISE NOTED.2.NIGHT WORK REQUIRES ADDITIONAL ROADWAYLIGHTING AT FLAGGING STATIONS.3.PEDESTRIAN SPOTTERS SHALL CONDUCTPEDESTRIAN TRAFFIC CONTROL AND ARE TOMAINTAIN OPEN SIDEWALKS AND ADA RAMPS.4.NOTIFY TRANSIT AUTHORITY FIVE DAYS PRIOR TOSTARTING WORK.5.ALL LANES SHOULD BE A MINIMUM OF 10' IN WIDTHAS MEASURED TO THE NEAR FACE OF THECHANNELIZING DEVICES.1000 FT.600 FT.550 FT.350 FT.250 FT.200 FT.150 FT. 6 7 8131321 935 MPH25 MPH30 MPH45 MPH50 MPH55+ MPH40 MPH125 FT.180 FT.245 FT.320 FT.540 FT.600 FT.1000 FT.25 FT.30 FT.35 FT.40 FT.45 FT.50 FT.55 FT.NO. OFCONESPER TAPERSPEEDAPPROACH(L)*LENGTHTAPERSPACING OF CONESALONG TAPERTAPER (FEET)SIGN SPACING (S)ADVANCE OF TAPER& BETWEEN SIGNS(*) NOTE - BASED ON 12-FOOT WIDE LANES.COLUMN IS ALSO APPROPRIATEFOR LANE WIDTHS LESS THAN 12 FEET.TABLEANOTE:INSTALL TEMPORARY NO PARKINGSIGNS 48 HOURS PRIOR TO START OFWORK.ACCESS TO DRIVEWAYS WILL BE GIVEN ATALL TIME DURING CONSTRUCTIONALL LANES SHOULD BE A MINIMUM OF 10' INWIDTH AS MEASURED TO THE NEAR FACEOF THE CHANNELIZING DEVICES.CONSTRUCTION WILL BE DONE WITHROLLING TRAFFIC CONTROL.SSL/3PEDESTRIANS WILL BE ESCORTEDBY FLAGGERS THRU THECONSTRUCTION ZONEPEDESTRIANS WILL BE ESCORTEDBY FLAGGERS THRU THECONSTRUCTION ZONEWORK VEHICLE#06 (POLE)ROADWORKAHEADW20-1SHOULDERWORKW21-5ROADWORKAHEADW20-1ROADWORKAHEADW20-1SSS10'MINROADWORKAHEADW20-1S10'MIN
TRAFFIC CONTROLTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY70ISSUE FOR PERMIT04/30/2024JEFFTC2-33SCALE: 1:40MATCHLINE-SEE SHEET TC1-2MATCHLINE-SEE SHEET TC3-4MFP24003847
D/WD/WD/WD/WD/WD/WD/WD/WFOCROWROWSIDEWALKFOCROWROWFOCFOC
SIDEWALK
FOC
SIDEWALK
ROW
ROW
FOCFOCROWROW
CATVCATVCATVCATVCATVINTERSTATE 405 ON-RAMP
SUNSET BLVD NE 30 MPHGRANDEY WAY NE 25 MPH BRONSON WAY NE 25 MPH579 BRONSON WAY NE,RENTON, WA 98056TC3-4GENERAL NOTES:1.ALL "W" SERIES SIGNS SHALL BE 48" FLUORESCENT ORANGE, UNLESS OTHERWISENOTED.2.NIGHT WORK REQUIRES ADDITIONAL ROADWAY LIGHTING AT FLAGGING STATIONS.3.PEDESTRIAN SPOTTERS SHALL CONDUCT PEDESTRIAN TRAFFIC CONTROL AND ARE TOMAINTAIN OPEN SIDEWALKS AND ADA RAMPS.4.NOTIFY TRANSIT AUTHORITY FIVE DAYS PRIOR TO STARTING WORK.5.ALL LANES SHOULD BE A MINIMUM OF 10' IN WIDTH AS MEASURED TO THE NEAR FACEOF THE CHANNELIZING DEVICES.1000 FT.600 FT.550 FT.350 FT.250 FT.200 FT.150 FT. 6 7 8131321 935 MPH25 MPH30 MPH45 MPH50 MPH55+ MPH40 MPH125 FT.180 FT.245 FT.320 FT.540 FT.600 FT.1000 FT.25 FT.30 FT.35 FT.40 FT.45 FT.50 FT.55 FT.NO. OFCONESPER TAPERSPEEDAPPROACH(L)*LENGTHTAPERSPACING OF CONESALONG TAPERTAPER (FEET)SIGN SPACING (S)ADVANCE OF TAPER& BETWEEN SIGNS(*) NOTE - BASED ON 12-FOOT WIDE LANES.COLUMN IS ALSO APPROPRIATEFOR LANE WIDTHS LESS THAN 12 FEET.TABLEANOTE:INSTALL TEMPORARY NO PARKINGSIGNS 48 HOURS PRIOR TO START OFWORK.ACCESS TO DRIVEWAYS WILL BE GIVEN ATALL TIME DURING CONSTRUCTIONALL LANES SHOULD BE A MINIMUM OF 10' INWIDTH AS MEASURED TO THE NEAR FACEOF THE CHANNELIZING DEVICES.CONSTRUCTION WILL BE DONE WITHROLLING TRAFFIC CONTROL.S S S
L/2SROADWORKAHEADW20-1ONE LANEROADAHEADW20-4W20-7BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1ROADWORKAHEADW20-1RIGHTLANECLOSEDAHEADW20-5RW4-2RPEDESTRIANS WILL BE ESCORTEDBY FLAGGERS THRU THECONSTRUCTION ZONEPEDESTRIANS WILL BE ESCORTEDBY FLAGGERS THRU THECONSTRUCTION ZONEWORK VEHICLE#04 (POLE)WORK VEHICLE#05 (POLE)SSSS10'MIN10'MIN
W20-713'28'60'14'18'TRAFFIC CONTROLTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY70ISSUE FOR PERMIT04/30/2024JEFFTC3-44SCALE: 1:40MATCHLINE-SEE SHEET TC2-3MATCHLINE-SEE SHEET TC4-5MFP24003847
D/WFOCSIDEWALK FOCROWROWD/WD/WD/WD/WFOCFOCROW
ROWS
IDEWA
LKSIDEWALK
FOCROW
FOC
ROWFOCSIDEWALKROWCA
T
VSUNSET BLVD NE 30 MPHINTERSTATE 405 ON-RAMP
G
R
A
N
D
E
Y
W
A
Y
N
E
2
5
M
P
H 529 GRANDEY WAY NE,RENTON, WA 98056TC4-5GENERAL NOTES:1.ALL "W" SERIES SIGNS SHALL BE 48" FLUORESCENT ORANGE, UNLESS OTHERWISENOTED.2.NIGHT WORK REQUIRES ADDITIONAL ROADWAY LIGHTING AT FLAGGING STATIONS.3.PEDESTRIAN SPOTTERS SHALL CONDUCT PEDESTRIAN TRAFFIC CONTROL AND ARE TOMAINTAIN OPEN SIDEWALKS AND ADA RAMPS.4.NOTIFY TRANSIT AUTHORITY FIVE DAYS PRIOR TO STARTING WORK.5.ALL LANES SHOULD BE A MINIMUM OF 10' IN WIDTH AS MEASURED TO THE NEAR FACEOF THE CHANNELIZING DEVICES.1000 FT.600 FT.550 FT.350 FT.250 FT.200 FT.150 FT. 6 7 8131321 935 MPH25 MPH30 MPH45 MPH50 MPH55+ MPH40 MPH125 FT.180 FT.245 FT.320 FT.540 FT.600 FT.1000 FT.25 FT.30 FT.35 FT.40 FT.45 FT.50 FT.55 FT.NO. OFCONESPER TAPERSPEEDAPPROACH(L)*LENGTHTAPERSPACING OF CONESALONG TAPERTAPER (FEET)SIGN SPACING (S)ADVANCE OF TAPER& BETWEEN SIGNS(*) NOTE - BASED ON 12-FOOT WIDE LANES.COLUMN IS ALSO APPROPRIATEFOR LANE WIDTHS LESS THAN 12 FEET.TABLEANOTE:INSTALL TEMPORARY NO PARKINGSIGNS 48 HOURS PRIOR TO START OFWORK.ACCESS TO DRIVEWAYS WILL BE GIVEN ATALL TIME DURING CONSTRUCTIONALL LANES SHOULD BE A MINIMUM OF 10' INWIDTH AS MEASURED TO THE NEAR FACEOF THE CHANNELIZING DEVICES.CONSTRUCTION WILL BE DONE WITHROLLING TRAFFIC CONTROL.PEDESTRIANS WILL BE ESCORTEDBY FLAGGERS THRU THECONSTRUCTION ZONEPEDESTRIANS WILL BE ESCORTEDBY FLAGGERS THRU THECONSTRUCTION ZONEWORK VEHICLE#01 (POLE)WORK VEHICLE#02 (POLE)WORK VEHICLE#03 (POLE)81'17'30'14'14'6'TRAFFIC CONTROLTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY70ISSUE FOR PERMIT04/30/2024JEFFTC4-55SCALE: 1:40MATCHLINE-SEE SHEET TC3-4MATCHLINE-SEE SHEET TC5-6
MFP24003847
FOCSIDEWALKROWFOCSIDEWALKROWFOCSIDEWALKROW
F
OC
SI
D
EW
A
L
K
R
OW
FO
C
FOC
FOC
ROW
FOC
RO
W
FOCROWTC5-6GENERAL NOTES:1.ALL "W" SERIES SIGNS SHALL BE 48" FLUORESCENT ORANGE, UNLESS OTHERWISENOTED.2.NIGHT WORK REQUIRES ADDITIONAL ROADWAY LIGHTING AT FLAGGING STATIONS.3.PEDESTRIAN SPOTTERS SHALL CONDUCT PEDESTRIAN TRAFFIC CONTROL AND ARE TOMAINTAIN OPEN SIDEWALKS AND ADA RAMPS.4.NOTIFY TRANSIT AUTHORITY FIVE DAYS PRIOR TO STARTING WORK.5.ALL LANES SHOULD BE A MINIMUM OF 10' IN WIDTH AS MEASURED TO THE NEAR FACEOF THE CHANNELIZING DEVICES.1000 FT.600 FT.550 FT.350 FT.250 FT.200 FT.150 FT. 6 7 8131321 935 MPH25 MPH30 MPH45 MPH50 MPH55+ MPH40 MPH125 FT.180 FT.245 FT.320 FT.540 FT.600 FT.1000 FT.25 FT.30 FT.35 FT.40 FT.45 FT.50 FT.55 FT.NO. OFCONESPER TAPERSPEEDAPPROACH(L)*LENGTHTAPERSPACING OF CONESALONG TAPERTAPER (FEET)SIGN SPACING (S)ADVANCE OF TAPER& BETWEEN SIGNS(*) NOTE - BASED ON 12-FOOT WIDE LANES.COLUMN IS ALSO APPROPRIATEFOR LANE WIDTHS LESS THAN 12 FEET.TABLEASUNSET BLVD
NE
30
MPH
I
N
T
E
R
S
T
A
T
E
4
0
5
O
F
F
-
R
AM
PNOTE:INSTALL TEMPORARY NO PARKINGSIGNS 48 HOURS PRIOR TO START OFWORK.ACCESS TO DRIVEWAYS WILL BE GIVEN ATALL TIME DURING CONSTRUCTIONALL LANES SHOULD BE A MINIMUM OF 10' INWIDTH AS MEASURED TO THE NEAR FACEOF THE CHANNELIZING DEVICES.CONSTRUCTION WILL BE DONE WITHROLLING TRAFFIC CONTROL.SSSSL/2ROADWORKAHEADW20-1ONE LANEROADAHEADW20-4W20-7BEPREPAREDTOSTOPW3-410'MIN28'14'14'28'14'14'PEDESTRIANS WILL BE ESCORTEDBY FLAGGERS THRU THECONSTRUCTION ZONEPEDESTRIANS WILL BE ESCORTEDBY FLAGGERS THRU THECONSTRUCTION ZONETRAFFIC CONTROLTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY70ISSUE FOR PERMIT04/30/2024JEFFTC5-66SCALE: 1:40MATCHLINE-SEE SHEET TC4-5MFP24003847
NOTES:1. Flaggers will be used to control traffic at non-signalized intersections. Flaggers Will use 2 way radios when a 24' (min) roadway cannot be maintained.2. No Parking/Tow Away signs will be posted 48 hours in advance to clear work zone.3. All construction zone signs/directional signs will conform to WSDOT specs. Signs will be spaced as noted on the plans.4. Use flag trees on all C-18/C-23 signs.Type A, Type I , or Type II .to select for Details onYFlaggerType I , Type II , or Type III .Refer to Section 6F.68 of MUTCDBarricade (For Excavation Only)High Level Warning Device (Flagtree)( Not a pavement marking )Flashing Arrow Sign (Where Required)Direction of TravelSignTraffic Cone or DelineatorLEGENDROADWORKAHEADW20-1SHOULDERWORKW21-5SHARETHEROADW11-1W16-1PR3-2RIGHTLANECLOSEDAHEADW20-5RW4-2RRURAL ROADS & URBAN ARTERIALS35 / 40 MPH350' +/- 45 / 55 MPHRURAL ROADS500' +/-25 / 30 MPH200' +/- (2)URBAN STREETS25 MPH OR LESS100' +/- (2) 60 / 65 MPHRURAL HIGHWAYSFREEWAYS & EXPRESSWAYS55 / 70 MPH800' +/-RURAL ROADS & URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTS1500' +/-(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT-GRADE INTERSECTIONS AND DRIVEWAYS.(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.10550605660105125150205270165225295180245320540115-----7206607808402530354050551260116570LANEWIDTH(feet)5005506004954504525303540455055606570SHOULDERWIDTH(feet)10'8'4040406060909090USE A 3 DEVICES TAPER FOR SHOULDERS LESS THEN 8'160200220170190240150190130170120150253035404550551236060801001501802703206570---LANEWIDTH(feet)MINIMUM TAPER LENGTH = L/2 (FEET)LANECLOSEDAHEADCENTERW9-3W1-4(L)R4-7BRIGHTKEEPKEEPRIGHTR4-7ALOCALACCESSONLYR5-133TRAFFIC CONTROL LEGENDTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY70ISSUE FOR PERMIT04/30/2024JEFFTCL1-77SCALE: N.T.S.MFP24003847
COVER-TITLETHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OF529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY80ISSUE FOR PERMIT04/30/2024JEFFScope of work to Target Address 652 Sunset Blvd NE North along Sunset Blvd NE, starting at Utility Pole located at (47.490922, -122.190464) parallel from east FOC. We plan to continue North on Sunset Blvd NE with Re‐strap 144CT & 72CT fiber approximately 841', parallel from the east FOC to location (47.492501,-122.190603). We plan to continue North on Sunset Blvd NE crossing the street from the east FOC to the west FOC to location (47.493078,-122.190962). · This ER project proposes to Re‐strap two runs of fiber 841' BUILDIn The City ROW·Bore footage:~0000'·Bore Pits:X·Potholes (2X2):X·New B36 Vaults:X·Existing Vault(s):X·New Pedestals:X·Existing Pedestals:X·Proof & Pull Existing Conduit:~000'~841'· Re‐strap footage: VICINITY MAPSHEET INDEXSheet #1C1-1 Cover-Title2G1-2 General Notes3CD1-4-CD4-7 Construction Plans4 D1-8 Construction DetailsSCALE: NONEContactC1-1PROJECT ID: JB00017843511CD1-4CD2-5CD3-6CD4-7Jessamin SantosComcastJessamin_Santos@cable.comcast.com206-401-2188MFP24003847This permit is for Major construction work in the ROW and will be billed at an additional$158/HR for inspections. After hours and weekend work will be billed at $175/HR
GENERAL NOTESTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY80ISSUE FOR PERMIT04/30/2024JEFFROADWAY CENTER LINEEXISTING COMCAST ROUTEEXISTING FENCELINEPROPOSED BORE ROUTEEXISTING WATER LINEEXISTING STORM DRAINEXISTING SANITARY SEWEREXISTING JOINT TRENCHEXISTING RECYCLED WATER LINEEXISTING TV SYSTEMEXISTING GAS SYSTEMEXISTING ELECTRICAL SYSTEMEXISTING TELEPHONE SYSTEMPROPERTY LINELINETYPESBORE PITWATER MANHOLEUNIDENTIFIED MANHOLEGAS METERWATER METERELECTRIC MANHOLESEWER CLEAN OUTSANITARY SEWER MANHOLESTORM DRAIN MANHOLECATCH BASINGAS/WATER VALVETREE/BUSHESGWEXISTING POLEEXISTING COMCAST PEDESTALNEW RISER ATTACHED TO POLEEXISTING IRRIGATION VAULTEXISTING COMCAST VAULTEXISTING UTILITY VAULT/PEDESTALSSCOECOWSDMONUMENTFIRE HYDRANTTRAFFIC SIGNAL COMBINATIONSTREET LIGHTTRANSFORMERNEW COMCAST LOW PROFILE NEW COMCAST PEDESTALNEW COMCAST VAULTPOWER SUPPLY W/ METERNEW COMCAST POWER SUPPLYSYMBOLSEXISTING WATEREXISTING TELEPHONEDRIVEWAYMAXIMUMD/WMAXW T RIGHT OF WAYEXISTING SANITARY SEWEREXISTING STORM DRAINPUBLIC UTILITY EASEMENTPROPERTY LINEMINIMUMFACE OF CURBEXISTINGCENTER LINECOMCASTL MINFOC (E) COMCAST CABBREVIATIONSPUEROWSS SDPL JTSSSDW+++TVTEGTVCATVNEW AERIAL STRAND/CABLE ROUTEOFFSETO/SBACK OF WALKBOWREMOVAL/REPAIRR/RNEW(N) G1-22EDGE OF PAVEMENTEOPANCHOR SUPPORTPROOF & PULL ROUTE (NEW CABLE IN (E) CONDUITS)PROPOSED TRENCH ROUTERWOPGENERAL NOTES1.ALL GENERAL NOTES SHALL APPLY TO ALL DRAWINGS, PLANS AND DETAILS.2.CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT (USA), AT LEAST 48 HOURS(AND NOT MORE THAN 14 DAYS) PRIOR TO THE START OF CONSTRUCTION BY CALLING (800)227-2600.3.CONTRACTOR SHALL POTHOLE/HAND DIG AND VERIFY ALL UNDERGROUND UTILITIES PRIORTO THE START OF CONSTRUCTION. ALL UTILITY LOCATIONS ON PLANS ARE APPROXIMATE,CONTRACTOR MUST VERIFY.4.CONTRACTOR SHALL VERIFY ALL FOOTAGES ON SITE, PRIOR TO THE START OFCONSTRUCTION. ALL DIMENSIONS SHOWN ON PLANS ARE APPROXIMATE.5.CONTRACTOR SHALL KEEP A COPY OF APPROVED PLAN(S) AND PERMIT(S) AT THE JOB SITEAT ALL TIMES AND PRESENT IT TO AN AUTHORIZED AGENT OF THE CITY OF RENTONAND/OR LAW ENFORCEMENT UPON REQUEST.6.CONTRACTOR SHALL ENSURE THAT ANY EXISTING FACILITIES DAMAGED OR REMOVED SHALLBE REPLACED IN KIND OR BETTER, INCLUDING BUT NOT LIMITED TO REPLACING EXISTINGSTRIPING AND REMOVING UNNECESSARY "USA" MARKINGS.7.CONTRACTOR SHALL WORK ONLY DURING APPROVED HOURS, UNLESS OTHERWISEAPPROVED IN WRITING BY THE "CITY ENGINEER."8.CONTRACTOR SHALL PERFORM ALL WORK AND TRAFFIC CONTROL IN ACCORDANCE WITHTHE CITY OF RENTON AND STATE OF WASHINGTON STANDARD PLANS AND SPECIFICATIONS,AND CURRENT WASHINGTON DEPARTMENT OF TRANSPORTATION "MANUAL OF UNIFORMTRAFFIC CONTROL DEVICES" AND "WASHINGTON MODIFICATION (468-95 WAC)" FOR USE INPERFORMANCE OF WORK UPON HIGHWAYS. FLASHING ARROW SIGNS SHALL BE REQUIREDFOR ALL LANE CLOSURES.9.CONTRACTOR SHALL ENSURE ALL WORK PERFORMED IS IN ACCORDANCE WITHREGULATIONS AND STANDARDS SET BY ANY AND ALL REGULATORY AGENCIES HAVINGJURISDICTION AT THIS WORK SITE, INCLUDING BUT NOT LIMITED TO THE STATE OFWASHINGTON UTILITIES AND TRANSPORTATION COMMISSION, THE STATE OF WASHINGTONDEPARTMENT OF LABOR AND INDUSTRIES, DIVISION OF OCCUPATIONAL SAFETY ANDHEALTH (DOSH), THE COUNTY OF KING, ALL WORK SHALL BE ACCESSIBLE AND SUBJECT TOINSPECTION BY CITY ENGINEER AND/OR AN AUTHORIZED AGENT OF COMCAST.10.CONTRACTOR SHALL "RED-LINE" ALL LAYOUTS, PLANS AND DETAILS, ON THE DAY OFCONSTRUCTION AND SUBMIT A COMPLETE SET OF "AS-BUILT" PLANS TO COMCAST UPONCOMPLETION OF THE PROJECT, AND TO CITY.11.CONTRACTOR SHALL NOTIFY RESIDENTS AFFECTED BY THE WORK IN LANDSCAPED AREA INADVANCE OF CONSTRUCTION.12.CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR 48 HOURS IN ADVANCE OFWORK COMMENCING.13.LANE CLOSURES ARE PROHIBITED BEFORE 8:30 AM AND AFTER 4:00 PM (3:00 PM OFFRIDAYS AND ON DAYS PRECEDING DESIGNATED LEGAL HOLIDAYS). NO LANE CLOSURES AREPERMITTED ON WEEKENDS AND HOLIDAYS.MFP24003847
D/WD/WD/WD/WD/WFOCFOCSIDEWALKROWROWFOCFOCROWROWD/WSUNSET BLVD NE652 SUNSET BLVD NE,RENTON, WA 98056BLAINE CT NE(E) UTILITY POLESCALE: 1:40CONSTRUCTION PLANSTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY80ISSUE FOR PERMIT04/30/2024JEFFCD1-44MFP24003847
D/WD/WD/WD/WD/WD/WD/WD/WSIDEWALKFOCROWROWFOCFOCFOCFOCROWROWFOCFOCROWROW
CATVCATVCATVCATVCATVINTERSTATE 405 ON-RAMPSUNSET BLVD NE2105 NE 6TH CT,RENTON, WA 98056NE 6TH CTBLAINE CT NE151' ROUTE(E) UTILITY POLE230' ROUTESCALE: 1:40CONSTRUCTION PLANSTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY80ISSUE FOR PERMIT04/30/2024JEFFCD2-55MFP24003847
D/WD/WD/WD/WD/WD/WD/WD/WFOCROWROWSIDEWALKFOCROWROWFOCFOC
SIDEWALK
FOC
SIDEWALK
ROW
ROW
FOCFOCROWROW
CATVCATVCATVCATVCATVINTERSTATE 405 ON-RAMP
SUNSET BLVD NEGRANDEY WAY NE BRONSON WAY NE579 BRONSON WAY NE,RENTON, WA 98056202' ROUTE(E) UTILITY POLE127' ROUTE(E) UTILITY POLESCALE: 1:40CONSTRUCTION PLANSTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY80ISSUE FOR PERMIT04/30/2024JEFFCD3-66MFP24003847
D/WFOCSIDEWALK FOCROWROWD/WD/WD/WD/WFOCFOCROW
ROWSIDEWA
LKSIDEWALK
FOCROW
CAT
VSUNSET BLVD NEINTERSTATE 405 ON-RAMP
G
R
A
N
D
E
Y
W
A
Y
N
E 529 GRANDEY WAY NE,RENTON, WA 98056(E) UTILITY POLE63' ROUTE(E) UTILITY POLE68' ROUTE(E) UTILITY POLESCALE: 1:40CONSTRUCTION PLANSTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY80ISSUE FOR PERMIT04/30/2024JEFFCD4-77MFP24003847
SCALE: 1:40CONSTRUCTION DETAILSTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY80ISSUE FOR PERMIT04/30/2024JEFFD1-88MFP24003847
CableCom LLC
1429 Avenue D, #339
Snohomish, WA 98290
8/20/2024
652 SUNSET BLVD NE
RENTON WA, 98057
RE: Aerial Variance Request for (JB00017184351)
To whom it may concern:
CableCom LLC has been contracted to design and engineer this project on behalf of Comcast Cable
Communications Management. Comcast is applying for a variance request to upgrade its existing
facilities.
Comcast proposed to –THIS ER PROJECT PROPOSES to res-strap two runs of fiber 841’ North along
Sunset Blvd NE, starting at Utility Pole located at (47.490922, -122.190464) parallel from east FOC. We
plan to continue North on Sunset Blvd NE with Re-strap 144CT & 72CT fiber approximately 841', parallel
from the east FOC to location (47.492501,-122.190603). We plan to continue North on Sunset Blvd NE
crossing the street from the east FOC to the west FOC to location (47.493078,-122.190962).
·
1 Installation of undergrounding facilities will increase the total cost of construction by roughly 7-10
times the amount of an aerial over-lash on the existing Comcast strand.
1. Risk of potential damage to underground facilities will be increased.
2. 3 Over lash will not cause a substantial adverse impact on other persons or entities in the
immediate area. Over lashing the cable will be accomplished in a few days, and the residents
will not notice any impact. Comcast will clean up the over-lashed spans as necessary and
identify and remove any existing dead cables along this route.
3. The variance is necessary to prevent any undue hardship due to the increased construction
costs if forced to install the proposed extension underground.
4. The granting of the variance will not be materially detrimental to the public welfare. Comcast
does agree to participate in future underground improvements for its proportionate share of
the undergrounding costs, waiving the obligation into the future when all other utilities are
undergrounded to prevent an undue hardship against Comcast currently.
Upon the granting of the variance, Comcast will coordinate construction and traffic control as per your
requirements. Comcast and their contractors want to cooperate at the highest level and agree to adhere
to all provisions and requirements set forth by the City of Renton to ensure the safe installation and
maintenance of the proposed facilities.
If you have any further questions regarding this project, please contact Jessamin Santos at (206) 401-
2188.
Thank you for your consideration in this matter.
Leah Ihlenfeldt
Permit Supervisor
CableCom LLC
(425) 691-9266
snohomish.permitting@cablecomllc.net
September 6, 2024
Leah Ihlenfeldt
CableCom LLC
19910 North Creek Pkwy, Suite 100
Bothell, WA 98011
Via Email: snohomish.permitting@cablecomllc.net
SUBJECT: Request for Undergrounding Exemption (JB#1784351, MFP24003847, 652 Sunset Blvd NE)
Dear Mrs. Ihlenfeldt:
The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal Code (RMC)
4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed
underground, pursuant to the standards of the section of RMC.
Comcast proposes to have Cannon Construction Inc overlash new fiber for a total of approximately 841 lineal feet
to existing Puget Sound Energy (PSE) poles along Sunset Blvd NE within the City. See the enclosed Site Plan showing
the proposed overlashing limits.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5720 grants
Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below, through and
across the streets, avenues and alleys of City of Renton within the right-of-way of Renton. Section 3.4 of the
franchise ordinance states that if all of the distribution lines all the wireline service providers, such as
telecommunications service providers, as defined in RCW 35.99.010, a utility service provider or a Cable Operator
(collectively “Service Providers”) in any portion of the Franchise Area are underground, Grantee shall place its
Cable System’s distribution cables underground within that area; provided that such underground locations are
actually capable of accommodating Grantee’s cable and other equipment without technical degradation of the
Cable Systems’ signal quality.
The proposal would utilize existing poles with other attached franchisee communication facilities and overlash to
the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need to be provided for,
any existing obsolete cable will need to be removed; staff recommends these as conditions of approval.
Therefore, the City is granting an exemption with conditions, per the Comcast franchise agreement which allows
new overhead facilities to be placed overhead provided there are other similar providers overhead as well.
Comcast is required to obtain all necessary private utility easements for work on private property.
DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C) as
requested by the applicant is approved with conditions subject to the conditions below as the request complies
with the Comcast Franchise Agreement.
Comcast Job JB#1784351
Page 2 of 2
September 6, 2024
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of construction. New
aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction
is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take place until
the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the
future, at the Applicant’s cost, when any one of the following events occurs: (1) any other utilities are
undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the
Project Reach, in which case the Applicant shall participate in the joint use trench installation for the
purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that
will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or
approved otherwise by the City of Renton Community and Economic Development Administrator or
designee, from the first event triggering the requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the
date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk,
along with the required appeal fee, by 5:00 pm, September 20, 2024. Appeals must be submitted electronically
to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday.
The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal
is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance
Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding
the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Director
cc: Justin Johnson, Construction Engineering Manager
Nathan Janders, Development Engineering Manager
Scott Warlick, Engineering Specialist III
Holly Powers, Engineering Specialist III
Franchise Permits
Enclosures: Site Plan
COVER-TITLETHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OF529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY80ISSUE FOR PERMIT04/30/2024JEFFScope of work to Target Address 652 Sunset Blvd NE North along Sunset Blvd NE, starting at Utility Pole located at (47.490922, -122.190464) parallel from east FOC. We plan to continue North on Sunset Blvd NE with Re‐strap 144CT & 72CT fiber approximately 841', parallel from the east FOC to location (47.492501,-122.190603). We plan to continue North on Sunset Blvd NE crossing the street from the east FOC to the west FOC to location (47.493078,-122.190962). · This ER project proposes to Re‐strap two runs of fiber 841' BUILDIn The City ROW·Bore footage:~0000'·Bore Pits:X·Potholes (2X2):X·New B36 Vaults:X·Existing Vault(s):X·New Pedestals:X·Existing Pedestals:X·Proof & Pull Existing Conduit:~000'~841'· Re‐strap footage: VICINITY MAPSHEET INDEXSheet #1C1-1 Cover-Title2G1-2 General Notes3CD1-4-CD4-7 Construction Plans4 D1-8 Construction DetailsSCALE: NONEContactC1-1PROJECT ID: JB00017843511CD1-4CD2-5CD3-6CD4-7Jessamin SantosComcastJessamin_Santos@cable.comcast.com206-401-2188MFP24003847
GENERAL NOTESTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY80ISSUE FOR PERMIT04/30/2024JEFFROADWAY CENTER LINEEXISTING COMCAST ROUTEEXISTING FENCELINEPROPOSED BORE ROUTEEXISTING WATER LINEEXISTING STORM DRAINEXISTING SANITARY SEWEREXISTING JOINT TRENCHEXISTING RECYCLED WATER LINEEXISTING TV SYSTEMEXISTING GAS SYSTEMEXISTING ELECTRICAL SYSTEMEXISTING TELEPHONE SYSTEMPROPERTY LINELINETYPESBORE PITWATER MANHOLEUNIDENTIFIED MANHOLEGAS METERWATER METERELECTRIC MANHOLESEWER CLEAN OUTSANITARY SEWER MANHOLESTORM DRAIN MANHOLECATCH BASINGAS/WATER VALVETREE/BUSHESGWEXISTING POLEEXISTING COMCAST PEDESTALNEW RISER ATTACHED TO POLEEXISTING IRRIGATION VAULTEXISTING COMCAST VAULTEXISTING UTILITY VAULT/PEDESTALSSCOECOWSDMONUMENTFIRE HYDRANTTRAFFIC SIGNAL COMBINATIONSTREET LIGHTTRANSFORMERNEW COMCAST LOW PROFILE NEW COMCAST PEDESTALNEW COMCAST VAULTPOWER SUPPLY W/ METERNEW COMCAST POWER SUPPLYSYMBOLSEXISTING WATEREXISTING TELEPHONEDRIVEWAYMAXIMUMD/WMAXW T RIGHT OF WAYEXISTING SANITARY SEWEREXISTING STORM DRAINPUBLIC UTILITY EASEMENTPROPERTY LINEMINIMUMFACE OF CURBEXISTINGCENTER LINECOMCASTL MINFOC (E) COMCAST CABBREVIATIONSPUEROWSS SDPL JTSSSDW+++TVTEGTVCATVNEW AERIAL STRAND/CABLE ROUTEOFFSETO/SBACK OF WALKBOWREMOVAL/REPAIRR/RNEW(N) G1-22EDGE OF PAVEMENTEOPANCHOR SUPPORTPROOF & PULL ROUTE (NEW CABLE IN (E) CONDUITS)PROPOSED TRENCH ROUTERWOPGENERAL NOTES1.ALL GENERAL NOTES SHALL APPLY TO ALL DRAWINGS, PLANS AND DETAILS.2.CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT (USA), AT LEAST 48 HOURS(AND NOT MORE THAN 14 DAYS) PRIOR TO THE START OF CONSTRUCTION BY CALLING (800)227-2600.3.CONTRACTOR SHALL POTHOLE/HAND DIG AND VERIFY ALL UNDERGROUND UTILITIES PRIORTO THE START OF CONSTRUCTION. ALL UTILITY LOCATIONS ON PLANS ARE APPROXIMATE,CONTRACTOR MUST VERIFY.4.CONTRACTOR SHALL VERIFY ALL FOOTAGES ON SITE, PRIOR TO THE START OFCONSTRUCTION. ALL DIMENSIONS SHOWN ON PLANS ARE APPROXIMATE.5.CONTRACTOR SHALL KEEP A COPY OF APPROVED PLAN(S) AND PERMIT(S) AT THE JOB SITEAT ALL TIMES AND PRESENT IT TO AN AUTHORIZED AGENT OF THE CITY OF RENTONAND/OR LAW ENFORCEMENT UPON REQUEST.6.CONTRACTOR SHALL ENSURE THAT ANY EXISTING FACILITIES DAMAGED OR REMOVED SHALLBE REPLACED IN KIND OR BETTER, INCLUDING BUT NOT LIMITED TO REPLACING EXISTINGSTRIPING AND REMOVING UNNECESSARY "USA" MARKINGS.7.CONTRACTOR SHALL WORK ONLY DURING APPROVED HOURS, UNLESS OTHERWISEAPPROVED IN WRITING BY THE "CITY ENGINEER."8.CONTRACTOR SHALL PERFORM ALL WORK AND TRAFFIC CONTROL IN ACCORDANCE WITHTHE CITY OF RENTON AND STATE OF WASHINGTON STANDARD PLANS AND SPECIFICATIONS,AND CURRENT WASHINGTON DEPARTMENT OF TRANSPORTATION "MANUAL OF UNIFORMTRAFFIC CONTROL DEVICES" AND "WASHINGTON MODIFICATION (468-95 WAC)" FOR USE INPERFORMANCE OF WORK UPON HIGHWAYS. FLASHING ARROW SIGNS SHALL BE REQUIREDFOR ALL LANE CLOSURES.9.CONTRACTOR SHALL ENSURE ALL WORK PERFORMED IS IN ACCORDANCE WITHREGULATIONS AND STANDARDS SET BY ANY AND ALL REGULATORY AGENCIES HAVINGJURISDICTION AT THIS WORK SITE, INCLUDING BUT NOT LIMITED TO THE STATE OFWASHINGTON UTILITIES AND TRANSPORTATION COMMISSION, THE STATE OF WASHINGTONDEPARTMENT OF LABOR AND INDUSTRIES, DIVISION OF OCCUPATIONAL SAFETY ANDHEALTH (DOSH), THE COUNTY OF KING, ALL WORK SHALL BE ACCESSIBLE AND SUBJECT TOINSPECTION BY CITY ENGINEER AND/OR AN AUTHORIZED AGENT OF COMCAST.10.CONTRACTOR SHALL "RED-LINE" ALL LAYOUTS, PLANS AND DETAILS, ON THE DAY OFCONSTRUCTION AND SUBMIT A COMPLETE SET OF "AS-BUILT" PLANS TO COMCAST UPONCOMPLETION OF THE PROJECT, AND TO CITY.11.CONTRACTOR SHALL NOTIFY RESIDENTS AFFECTED BY THE WORK IN LANDSCAPED AREA INADVANCE OF CONSTRUCTION.12.CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR 48 HOURS IN ADVANCE OFWORK COMMENCING.13.LANE CLOSURES ARE PROHIBITED BEFORE 8:30 AM AND AFTER 4:00 PM (3:00 PM OFFRIDAYS AND ON DAYS PRECEDING DESIGNATED LEGAL HOLIDAYS). NO LANE CLOSURES AREPERMITTED ON WEEKENDS AND HOLIDAYS.MFP24003847
D/WD/WD/WD/WD/WFOCFOCSIDEWALKROWROWFOCFOCROWROWD/WSUNSET BLVD NE652 SUNSET BLVD NE,RENTON, WA 98056BLAINE CT NE(E) UTILITY POLESCALE: 1:40CONSTRUCTION PLANSTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY80ISSUE FOR PERMIT04/30/2024JEFFCD1-44MFP24003847
D/WD/WD/WD/WD/WD/WD/WD/WSIDEWALKFOCROWROWFOCFOCFOCFOCROWROWFOCFOCROWROW
CATVCATVCATVCATVCATVINTERSTATE 405 ON-RAMPSUNSET BLVD NE2105 NE 6TH CT,RENTON, WA 98056NE 6TH CTBLAINE CT NE151' ROUTE(E) UTILITY POLE230' ROUTESCALE: 1:40CONSTRUCTION PLANSTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY80ISSUE FOR PERMIT04/30/2024JEFFCD2-55MFP24003847
D/WD/WD/WD/WD/WD/WD/WD/WFOCROWROWSIDEWALKFOCROWROWFOCFOC
SIDEWALK
FOC
SIDEWALK
ROW
ROW
FOCFOCROWROW
CATVCATVCATVCATVCATVINTERSTATE 405 ON-RAMP
SUNSET BLVD NEGRANDEY WAY NE BRONSON WAY NE579 BRONSON WAY NE,RENTON, WA 98056202' ROUTE(E) UTILITY POLE127' ROUTE(E) UTILITY POLESCALE: 1:40CONSTRUCTION PLANSTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY80ISSUE FOR PERMIT04/30/2024JEFFCD3-66MFP24003847
D/WFOCSIDEWALK FOCROWROWD/WD/WD/WD/WFOCFOCROW
ROWSIDEWA
LKSIDEWALK
FOCROW
CAT
VSUNSET BLVD NEINTERSTATE 405 ON-RAMP
G
R
A
N
D
E
Y
W
A
Y
N
E 529 GRANDEY WAY NE,RENTON, WA 98056(E) UTILITY POLE63' ROUTE(E) UTILITY POLE68' ROUTE(E) UTILITY POLESCALE: 1:40CONSTRUCTION PLANSTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY80ISSUE FOR PERMIT04/30/2024JEFFCD4-77MFP24003847
SCALE: 1:40CONSTRUCTION DETAILSTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.529 GRANDEY WAY NE, RENTON, WA 98056JB0001784351PLANT REPAIRSKING COUNTY80ISSUE FOR PERMIT04/30/2024JEFFD1-88MFP24003847
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP24003847
Engineering
1 A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
2 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the
Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the
Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or
(3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and
Economic Development Administrator or designee, from the first event triggering the requirement to underground
the aerial lines.
3 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
4 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15'-6".