HomeMy WebLinkAboutMFP24003983.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP24003983
IVR Number: 24003983
Permit Information
Permit Name: Comcast - 2829 NE 3rd St - JB-1824466
Address/Location:08/05/2024Application Date:1623059144Parcel Number: 2829 NE 3RD ST
Permit Type:09/06/2024Issue Date:Franchise
Permit Work Class:09/08/2025Expiration Date:Major Utility
Job Number: JB-1824466Franchise Type:Cable
Description: Comcast 96ct & 24ct fiber 1788' of overlash, 140' bore/trench, 848' pulling through existing conduit, placing new
riser and splicing in various locations.
Contacts
Name Address PhoneTypeBilling
Jacob Neu
ADP-Resources, LLC
163 SW Academy St.
Dallas, OR 97338
ApplicantX
Joshua Ashley
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (503) 939-7931Contact
Michael Cannon
Cannon Construction Inc
406 Porter Way
Milton, WA 98354-9638
B: (253) 922-2787
C: (253) 588-4034
Contractor
Business License Number: 20838Construction Contractor: CANNOCL791JK
GILROY FAMILY LLC 1614 118TH AVE SE
BELLEVUE , WA 98005
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
Monday Friday
MFP24003983
8:00am 3:00pm
Scott Warlick CED 9/6/2024
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
NOTES:1.ALL SPACING SHOWN IN FEET.2.CHANNELIZING DEVICES SPACING IS 20' O.C.3.RECOMMENDED EXTENDING CHANNELIZINGDEVICE TAPER ACROSS SHOULDER.4.KEEP DRIVEWAYS OPEN WHEN POSSIBLE5.THIS PLAN IS SUBJECT TO CHANGE TO MEETFIELD CONDITIONS.6.NON-FREEWAY SIGNS SPACING MAY BE MADETO FIT FIELD DIMENSIONS SHOWN.7.PLACE APPROPRIATE SIGNS ON ALL SIDESTREETS.8.RESTRICTED SIGHT DISTANCES REQUIRESADDITIONAL ADVANCE WARNING DEVICE ORSIGNS.9.SIGNS ARE 48"X48" IN SIZE. CONES ARE ATLEAST 28" TALL.10.NIGHT WORK REQUIRES ADDITIONAL ROADWAYLIGHTING AT FLAGGING STATIONS.11.WORK VEHICLE LOCATED IN SAME AREA ASWORK LOCATION.12.POSTED SPEED: EQUIVALENT TO THE EXISTING,POSTED OR STATUTORY SPEED.13.ADHERE TO BICYCLE ACCOMMODATION WHENBICYCLE LANE IS PRESENT14.A SPOTTER IS REQUIRED TO ASSISTPEDESTRIANS AROUND WORK SITE.PEDESTRIAN ACCESS MUST REMAIN CLEAR ATALL TIMES.15.COORDINATE WITH THE FOLLOWING CITYDEPARTMENTS AT LEAST 48 HOURS INADVANCE: POLICE, FIRE, EMERGENCY, PUBLICTRANSIT, PARKING.LEGENDCHANNELIZING DEVICESIGN LOCATIONTRAFFIC DIRECTIONWORK AREAROAD CLOSURE SIGN LOCATIONFLAGGER1EDMONDS AV
E
N
E
25 MPH
SE 1ST ST25 MPHW21-7
UTILITY
WORK
AHEAD100'100'W21-7UTILITYWORKAHEADW1-4L100'
100'W21-7UTILITYWORKAHEADACCESS EQUIPMENTALONG EDMONDS AVE SE10' MIN10' MIN65' 65'
50'
EDMONDS AVE SE
25 MPH
NTCP 1REVISED
DATE:
SHEET:FIELDED BY :OF
163 SW ACADEMY ST,
DALLAS, OR 97351
(503) 400-7440
DRAFTED BY :
SCALE:
11308 SW 68TH PKWY
TIGARD, OR 97223
800.266.2278
8
08/01/2024 --
--
--
--
THE STORE-HOUSE SELF STORAGE -
2829 NE 3RD ST
RENTON, WA 98056 CITY OF RENTON
NTS
JB-1824466
TRAFFIC CONTROL
PLAN
1T. MOORE
T. SCHMITZ MFP24003983
NOTES:1.ALL SPACING SHOWN IN FEET.2.CHANNELIZING DEVICES SPACING IS 20' O.C.3.RECOMMENDED EXTENDING CHANNELIZINGDEVICE TAPER ACROSS SHOULDER.4.KEEP DRIVEWAYS OPEN WHEN POSSIBLE5.THIS PLAN IS SUBJECT TO CHANGE TO MEETFIELD CONDITIONS.6.NON-FREEWAY SIGNS SPACING MAY BE MADETO FIT FIELD DIMENSIONS SHOWN.7.PLACE APPROPRIATE SIGNS ON ALL SIDESTREETS.8.RESTRICTED SIGHT DISTANCES REQUIRESADDITIONAL ADVANCE WARNING DEVICE ORSIGNS.9.SIGNS ARE 48"X48" IN SIZE. CONES ARE ATLEAST 28" TALL.10.NIGHT WORK REQUIRES ADDITIONAL ROADWAYLIGHTING AT FLAGGING STATIONS.11.WORK VEHICLE LOCATED IN SAME AREA ASWORK LOCATION.12.POSTED SPEED: EQUIVALENT TO THE EXISTING,POSTED OR STATUTORY SPEED.13.ADHERE TO BICYCLE ACCOMMODATION WHENBICYCLE LANE IS PRESENT14.A SPOTTER IS REQUIRED TO ASSISTPEDESTRIANS AROUND WORK SITE.PEDESTRIAN ACCESS MUST REMAIN CLEAR ATALL TIMES.15.COORDINATE WITH THE FOLLOWING CITYDEPARTMENTS AT LEAST 48 HOURS INADVANCE: POLICE, FIRE, EMERGENCY, PUBLICTRANSIT, PARKING.LEGENDCHANNELIZING DEVICESIGN LOCATIONTRAFFIC DIRECTIONWORK AREAROAD CLOSURE SIGN LOCATIONFLAGGER1EDMONDS AVE NE
25 MPH
NE 3RD ST35 MPHACCESS EQUIPMENTALONG NE 3RD STOVERLASH CABLE ACROSSNE 3RD STOVERLASH CABLE ALONGNE 3RD ST100'W21-7UTILITYWORKAHEAD100'100'100'W21-7UTILITYWORKAHEAD100'100'W20-7W3-4BEPREPAREDTO STOPW20-7W3-4BEPREPAREDTO STOP350'W21-7UTILITYWORKAHEAD350'350'W4-2RW9-3RRIGHTLANECLOSEDAHEAD350'W20-7350'
W21-7
UTILIT
Y
WORK
AHEAD350'350'
W4-2R
W9-3R
RIGHT
LANE
CLOSE
D
AHEAD350'
W20-7PEDESTRIANESCORTPEDESTRIANESCORTPEDESTRIANESCORTPEDESTRIANESCORTPEDESTRIANESCORT10' MIN10' MIN10' MIN10' MIN10' MIN245'245'50'-100'NTCP 2REVISED
DATE:
SHEET:FIELDED BY :OF
163 SW ACADEMY ST,
DALLAS, OR 97351
(503) 400-7440
DRAFTED BY :
SCALE:
11308 SW 68TH PKWY
TIGARD, OR 97223
800.266.2278
8
08/01/2024 --
--
--
--
THE STORE-HOUSE SELF STORAGE -
2829 NE 3RD ST
RENTON, WA 98056 CITY OF RENTON
NTS
JB-1824466
TRAFFIC CONTROL
PLAN
2T. MOORE
T. SCHMITZ uniformed police officer willbe required to help controlthe intersection
NOTES:1.ALL SPACING SHOWN IN FEET.2.CHANNELIZING DEVICES SPACING IS 20' O.C.3.RECOMMENDED EXTENDING CHANNELIZINGDEVICE TAPER ACROSS SHOULDER.4.KEEP DRIVEWAYS OPEN WHEN POSSIBLE5.THIS PLAN IS SUBJECT TO CHANGE TO MEETFIELD CONDITIONS.6.NON-FREEWAY SIGNS SPACING MAY BE MADETO FIT FIELD DIMENSIONS SHOWN.7.PLACE APPROPRIATE SIGNS ON ALL SIDESTREETS.8.RESTRICTED SIGHT DISTANCES REQUIRESADDITIONAL ADVANCE WARNING DEVICE ORSIGNS.9.SIGNS ARE 48"X48" IN SIZE. CONES ARE ATLEAST 28" TALL.10.NIGHT WORK REQUIRES ADDITIONAL ROADWAYLIGHTING AT FLAGGING STATIONS.11.WORK VEHICLE LOCATED IN SAME AREA ASWORK LOCATION.12.POSTED SPEED: EQUIVALENT TO THE EXISTING,POSTED OR STATUTORY SPEED.13.ADHERE TO BICYCLE ACCOMMODATION WHENBICYCLE LANE IS PRESENT14.A SPOTTER IS REQUIRED TO ASSISTPEDESTRIANS AROUND WORK SITE.PEDESTRIAN ACCESS MUST REMAIN CLEAR ATALL TIMES.15.COORDINATE WITH THE FOLLOWING CITYDEPARTMENTS AT LEAST 48 HOURS INADVANCE: POLICE, FIRE, EMERGENCY, PUBLICTRANSIT, PARKING.LEGENDCHANNELIZING DEVICESIGN LOCATIONTRAFFIC DIRECTIONWORK AREAROAD CLOSURE SIGN LOCATIONFLAGGER1EDMONDS AVE NE25 MPH
NE 3RD ST35 MPHOVERLASH CABLE ALONGNE 3RD ST100'W21-7UTILITYWORKAHEADW21-7UTILITYWORKAHEAD100'350'W21-7UTILITYWORKAHEAD350'
W21-7
UTILITY
WORK
AHEAD350'350'
W4-2R
W9-3R
RIGHT
LANE
CLOSED
AHEADPEDESTRIANESCORT10' MINPEDESTRIANESCORT245'50'NTCP 3REVISED
DATE:
SHEET:FIELDED BY :OF
163 SW ACADEMY ST,
DALLAS, OR 97351
(503) 400-7440
DRAFTED BY :
SCALE:
11308 SW 68TH PKWY
TIGARD, OR 97223
800.266.2278
8
08/01/2024 --
--
--
--
THE STORE-HOUSE SELF STORAGE -
2829 NE 3RD ST
RENTON, WA 98056 CITY OF RENTON
NTS
JB-1824466
TRAFFIC CONTROL
PLAN
3T. MOORE
T. SCHMITZ
NOTES:1.ALL SPACING SHOWN IN FEET.2.CHANNELIZING DEVICES SPACING IS 20' O.C.3.RECOMMENDED EXTENDING CHANNELIZINGDEVICE TAPER ACROSS SHOULDER.4.KEEP DRIVEWAYS OPEN WHEN POSSIBLE5.THIS PLAN IS SUBJECT TO CHANGE TO MEETFIELD CONDITIONS.6.NON-FREEWAY SIGNS SPACING MAY BE MADETO FIT FIELD DIMENSIONS SHOWN.7.PLACE APPROPRIATE SIGNS ON ALL SIDESTREETS.8.RESTRICTED SIGHT DISTANCES REQUIRESADDITIONAL ADVANCE WARNING DEVICE ORSIGNS.9.SIGNS ARE 48"X48" IN SIZE. CONES ARE ATLEAST 28" TALL.10.NIGHT WORK REQUIRES ADDITIONAL ROADWAYLIGHTING AT FLAGGING STATIONS.11.WORK VEHICLE LOCATED IN SAME AREA ASWORK LOCATION.12.POSTED SPEED: EQUIVALENT TO THE EXISTING,POSTED OR STATUTORY SPEED.13.ADHERE TO BICYCLE ACCOMMODATION WHENBICYCLE LANE IS PRESENT14.A SPOTTER IS REQUIRED TO ASSISTPEDESTRIANS AROUND WORK SITE.PEDESTRIAN ACCESS MUST REMAIN CLEAR ATALL TIMES.15.COORDINATE WITH THE FOLLOWING CITYDEPARTMENTS AT LEAST 48 HOURS INADVANCE: POLICE, FIRE, EMERGENCY, PUBLICTRANSIT, PARKING.LEGENDCHANNELIZING DEVICESIGN LOCATIONTRAFFIC DIRECTIONWORK AREAROAD CLOSURE SIGN LOCATIONFLAGGER1NE 3RD ST35 MPHOVERLASH CABLE ALONGNE 3RD ST350'W21-7UTILITYWORKAHEAD350
'
W21
-
7
UTIL
I
T
Y
WOR
K
AHE
A
D350'350'
W4-2R
W9-3R
RIGHT
LANE
CLOS
E
D
AHEA
DPEDESTRIANESCORT10' MINPEDESTRIANESCORT245'50'NTCP 4REVISED
DATE:
SHEET:FIELDED BY :OF
163 SW ACADEMY ST,
DALLAS, OR 97351
(503) 400-7440
DRAFTED BY :
SCALE:
11308 SW 68TH PKWY
TIGARD, OR 97223
800.266.2278
8
08/01/2024 --
--
--
--
THE STORE-HOUSE SELF STORAGE -
2829 NE 3RD ST
RENTON, WA 98056 CITY OF RENTON
NTS
JB-1824466
TRAFFIC CONTROL
PLAN
4T. MOORE
T. SCHMITZ
NOTES:1.ALL SPACING SHOWN IN FEET.2.CHANNELIZING DEVICES SPACING IS 20' O.C.3.RECOMMENDED EXTENDING CHANNELIZINGDEVICE TAPER ACROSS SHOULDER.4.KEEP DRIVEWAYS OPEN WHEN POSSIBLE5.THIS PLAN IS SUBJECT TO CHANGE TO MEETFIELD CONDITIONS.6.NON-FREEWAY SIGNS SPACING MAY BE MADETO FIT FIELD DIMENSIONS SHOWN.7.PLACE APPROPRIATE SIGNS ON ALL SIDESTREETS.8.RESTRICTED SIGHT DISTANCES REQUIRESADDITIONAL ADVANCE WARNING DEVICE ORSIGNS.9.SIGNS ARE 48"X48" IN SIZE. CONES ARE ATLEAST 28" TALL.10.NIGHT WORK REQUIRES ADDITIONAL ROADWAYLIGHTING AT FLAGGING STATIONS.11.WORK VEHICLE LOCATED IN SAME AREA ASWORK LOCATION.12.POSTED SPEED: EQUIVALENT TO THE EXISTING,POSTED OR STATUTORY SPEED.13.ADHERE TO BICYCLE ACCOMMODATION WHENBICYCLE LANE IS PRESENT14.A SPOTTER IS REQUIRED TO ASSISTPEDESTRIANS AROUND WORK SITE.PEDESTRIAN ACCESS MUST REMAIN CLEAR ATALL TIMES.15.COORDINATE WITH THE FOLLOWING CITYDEPARTMENTS AT LEAST 48 HOURS INADVANCE: POLICE, FIRE, EMERGENCY, PUBLICTRANSIT, PARKING.LEGENDCHANNELIZING DEVICESIGN LOCATIONTRAFFIC DIRECTIONWORK AREAROAD CLOSURE SIGN LOCATIONFLAGGER1NE 3RD ST35 MPHNE 4TH ST25 MPHJEFFERSON AVE NE25 MPHNE 4TH ST35 MPHOVERLASH CABLE ALONGNE 3RD ST350'
W21-7
UTILITY
WORK
AHEAD350'
3
5
0
'
W4-2
R
W9-3R
RIGHT
LANE
CLOS
E
D
AHEA
DPEDESTRIANESCORT10' MINPEDESTRIANESCORT2
4
5
'50'PEDESTRIANESCORTBORE CABLE ALONGNE 3RD STBORE CABLE ACROSSNE 3RD STW21-7UTILITYWORKAHEAD100'
W21-7
UTILITY
WORK
AHEAD100'W21-7UTILITYWORKAHEAD100'3
5
0
'
W20-
7245'350'W21-7UTILITYWORKAHEAD350'350'W4-2RW9-3RRIGHTLANECLOSEDAHEAD350'W20-710' MINCLOSURE AFFECTS DRIVEWAY:2828 NE 3RD ST 98056PROPERTY OWNER PERMISSION ISREQUIRED TO BLOCK DRIVEWAY.NOTIFY AFFECTED BUSINESSOF WORK TIMES/DATESNTCP 5REVISED
DATE:
SHEET:FIELDED BY :OF
163 SW ACADEMY ST,
DALLAS, OR 97351
(503) 400-7440
DRAFTED BY :
SCALE:
11308 SW 68TH PKWY
TIGARD, OR 97223
800.266.2278
8
08/01/2024 --
--
--
--
THE STORE-HOUSE SELF STORAGE -
2829 NE 3RD ST
RENTON, WA 98056 CITY OF RENTON
NTS
JB-1824466
TRAFFIC CONTROL
PLAN
5T. MOORE
T. SCHMITZ Additional traffic controlwill be needed for thepotholing of utilities.
NOTES:1.ALL SPACING SHOWN IN FEET.2.CHANNELIZING DEVICES SPACING IS 20' O.C.3.RECOMMENDED EXTENDING CHANNELIZINGDEVICE TAPER ACROSS SHOULDER.4.KEEP DRIVEWAYS OPEN WHEN POSSIBLE5.THIS PLAN IS SUBJECT TO CHANGE TO MEETFIELD CONDITIONS.6.NON-FREEWAY SIGNS SPACING MAY BE MADETO FIT FIELD DIMENSIONS SHOWN.7.PLACE APPROPRIATE SIGNS ON ALL SIDESTREETS.8.RESTRICTED SIGHT DISTANCES REQUIRESADDITIONAL ADVANCE WARNING DEVICE ORSIGNS.9.SIGNS ARE 48"X48" IN SIZE. CONES ARE ATLEAST 28" TALL.10.NIGHT WORK REQUIRES ADDITIONAL ROADWAYLIGHTING AT FLAGGING STATIONS.11.WORK VEHICLE LOCATED IN SAME AREA ASWORK LOCATION.12.POSTED SPEED: EQUIVALENT TO THE EXISTING,POSTED OR STATUTORY SPEED.13.ADHERE TO BICYCLE ACCOMMODATION WHENBICYCLE LANE IS PRESENT14.A SPOTTER IS REQUIRED TO ASSISTPEDESTRIANS AROUND WORK SITE.PEDESTRIAN ACCESS MUST REMAIN CLEAR ATALL TIMES.15.COORDINATE WITH THE FOLLOWING CITYDEPARTMENTS AT LEAST 48 HOURS INADVANCE: POLICE, FIRE, EMERGENCY, PUBLICTRANSIT, PARKING.LEGENDCHANNELIZING DEVICESIGN LOCATIONTRAFFIC DIRECTIONWORK AREAROAD CLOSURE SIGN LOCATIONFLAGGER1NE 7TH ST25 MPHPEDESTRIANESCORTSPLICING REQUIREDALONG NE 7TH STKIRKLAND AVE NE
25 MPHW21-7UTILITYWORKAHEAD100'W21-7UTILITYWORKAHEAD100'W21-7UTILITYWORKAHEAD100'
W21-7
UTILITY
WORK
AHEAD100'35'50'10' MINNTCP 6REVISED
DATE:
SHEET:FIELDED BY :OF
163 SW ACADEMY ST,
DALLAS, OR 97351
(503) 400-7440
DRAFTED BY :
SCALE:
11308 SW 68TH PKWY
TIGARD, OR 97223
800.266.2278
8
08/01/2024 --
--
--
--
THE STORE-HOUSE SELF STORAGE -
2829 NE 3RD ST
RENTON, WA 98056 CITY OF RENTON
NTS
JB-1824466
TRAFFIC CONTROL
PLAN
6T. MOORE
T. SCHMITZ
BICYCLE ACCOMMODATIONREVISED
DATE:
SHEET:FIELDED BY :OF
163 SW ACADEMY ST,
DALLAS, OR 97351
(503) 400-7440
DRAFTED BY :
SCALE:
11308 SW 68TH PKWY
TIGARD, OR 97223
800.266.2278
8
08/01/2024 --
--
--
--
THE STORE-HOUSE SELF STORAGE -
2829 NE 3RD ST
RENTON, WA 98056 CITY OF RENTON
NTS
JB-1824466
TRAFFIC CONTROL
PLAN
7T. MOORE
T. SCHMITZ
PEDESTRIAN ACCOMMODATIONREVISED
DATE:
SHEET:FIELDED BY :OF
163 SW ACADEMY ST,
DALLAS, OR 97351
(503) 400-7440
DRAFTED BY :
SCALE:
11308 SW 68TH PKWY
TIGARD, OR 97223
800.266.2278
8
08/01/2024 --
--
--
--
THE STORE-HOUSE SELF STORAGE -
2829 NE 3RD ST
RENTON, WA 98056 CITY OF RENTON
NTS
JB-1824466
TRAFFIC CONTROL
PLAN
8T. MOORE
T. SCHMITZ
APPROACH PLAN
LABOR:
AERIAL:
OVERLASH = 1788’
RISER = 50’
TOTAL POLES = 8
TOTAL AERIAL FOOTAGES = 1838’
UNDERGROUND:
BORE/TRENCH = 140’
ROD&ROPE = 848’
TOTAL UG FOOTAGES = 988’
PERMITS TO BE SUBMITTED:
POLE ATTACHMENT
CITY
TRAFFIC CONTROL PLAN
Legend
FIELD DATE 7/23/2024
Reference DG
JB-1824466
The Store-House Self Storage
2829 NE 3rd St Renton WA 98056
Place (N) SP0490.WAKV and
Tie-In (N) 96 ct fiber into (E)
SP.WAKV.0204
POLE 1: #318014/166567
(E) 25’ riser
POLE 2: #318023-166567
POLE 3: #318176-166583
POLE 4:
#318039-166606
(E) Ped
TCP 1
TCP 2
TCP 3
MFP24003983This permit is for Major construction work in the ROW and will be billed at an additional
$158/HR for inspections. After hours and weekend work will be billed at $175/HR
APPROACH PLAN
Legend
Reference DG
JB-1824466
The Store-House Self Storage
2829 NE 3rd St Renton WA 98056
POLE 7: 3..069-166708
Place (N) SP0491.WAKV 5’ E of
pole and Tie-In (N) 24 ct fiber
POLE 8: #318069-166708
PLACE (N) RISER ON (N)
BRACKETS W QUAD
POLE 5:
#318049-…….
POLE 6: #318061-166679
TCP 4
TCP 5
MFP24003983
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
APPROACH PLAN
Legend
Reference DG
JB-1824466
The Store-House Self Storage
2829 NE 3rd St Renton WA 98056
Splicing required at
SP WAKV.0120.
Located 30’ from East pole
Splicing required at
SP WAKV.0107.
Located 35’ from East pole
TCP 6
MFP24003983
ADP Resources, LLC
163 SW Academy St
Dallas, OR 97338
8/5/2024
City of Renton
1055 South Grady Way
Renton, WA 98057
RE: Aerial Variance Request for JB-1824466
To whom it may concern:
ADP Resources, LLC has been contracted to permit this project on behalf of Comcast Cable
Communications Management. Comcast is applying for a variance request in order to upgrade
existing facilities.
Comcast proposes to PLACE NEW SP0490.WAKV AND TIE-IN NEW 96CT FIBER INTO
SP.WAKV.0204, 140’ OF BORE/TRENCH AND 848’ PULLING THROUGH EXISGING CONDUIT. 1788’
OF OVERLASH (1) 24CT FIBER ON EXISTING STRAND, PLACE NEW SP0491.WAKV 5’ EAST OF POLE
7: 3..069-166708 AND TIE IN NEW 24CT FIBER, PLACE NEW RISER ON NEW BRACKETS W QUAD AT
POLE 8: 318069-166708, 140’ OF BORE AND PERFORM SPLICING IN VARIOUS LOCATIONS ON NE
7TH ST , RENTON, WA 98057
Comcast is requesfing that the City of Renton approve this variance request based on the fact
that the requirements for undergrounding this proposed overlash on exisfing plant will cause
undue hardship:
1. Installafion of undergrounding facilifies will increase the total cost of construcfion
roughly 15-25 fimes the amount of an aerial over-lash on the exisfing Comcast strand.
2. Risk of potenfial damage to underground facilifies will be increased.
3. Over-lash will not cause substanfial adverse impact to other persons or enfifies in the
immediate area. Over-lashing the cable will be accomplished in a few days, and the
residents will not nofice any impact. Comcast will clean up the over-lashed spans as
necessary and idenfify and remove any exisfing dead cables along this route.
4. The variance is necessary to prevent any undue hardship due to the increased
construcfion costs if forced to install the proposed extension underground.
5. The granfing of the variance will not be materially detrimental to the public welfare.
Comcast does agree to parficipate in future underground improvements for its
proporfionate share of the undergrounding costs, waiving the obligafion into the future
when all other ufilifies are undergrounded to prevent an undue hardship against
Comcast currently.
Upon the granfing of the variance, Comcast will coordinate construcfion and traffic control as
per your requirements. Comcast and their contractors want to cooperate at the highest level
and agree to adhere to all provisions and requirements set forth by the City of Renton to insure
safe installafion and maintenance of the proposed facilifies.
If you have any further questions regarding this project, please contact Josh Ashley, 503-939-7931,
Joshua_ashley@comcast.com
Thank you for your consideration in this matter.
Jacob Neu
Permit Department Manager
ADP Resources, LLC
503-673-8256 | row_permits@adp-resources.com
September 6, 2024
Jacob Neu
ADP Resources, LLC
163 SW academy St
Dallas, OR 97338
Via Email: row_permits@adp-resources.com
SUBJECT: Request for Undergrounding Exemption (JB#1824466, MFP24003983, 2829 NE 3rd St)
Dear Mr. Neu:
The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal Code (RMC)
4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed
underground, pursuant to the standards of the section of RMC.
Comcast proposes to have Cannon Construction Inc overlash new fiber for a total of approximately 1,788 lineal
feet to existing Puget Sound Energy (PSE) poles along NE 3rd St within the City. See the enclosed Site Plan showing
the proposed overlashing limits.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5720 grants
Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below, through and
across the streets, avenues and alleys of City of Renton within the right-of-way of Renton. Section 3.4 of the
franchise ordinance states that if all of the distribution lines all the wireline service providers, such as
telecommunications service providers, as defined in RCW 35.99.010, a utility service provider or a Cable Operator
(collectively “Service Providers”) in any portion of the Franchise Area are underground, Grantee shall place its
Cable System’s distribution cables underground within that area; provided that such underground locations are
actually capable of accommodating Grantee’s cable and other equipment without technical degradation of the
Cable Systems’ signal quality.
The proposal would utilize existing poles with other attached franchisee communication facilities and overlash to
the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need to be provided for,
any existing obsolete cable will need to be removed; staff recommends these as conditions of approval.
Therefore, the City is granting an exemption with conditions, per the Comcast franchise agreement which allows
new overhead facilities to be placed overhead provided there are other similar providers overhead as well.
Comcast is required to obtain all necessary private utility easements for work on private property.
DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C) as
requested by the applicant is approved with conditions subject to the conditions below as the request complies
with the Comcast Franchise Agreement.
Comcast Job JB#1824466
Page 2 of 2
September 6, 2024
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of construction. New
aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction
is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take place until
the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the
future, at the Applicant’s cost, when any one of the following events occurs: (1) any other utilities are
undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the
Project Reach, in which case the Applicant shall participate in the joint use trench installation for the
purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that
will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or
approved otherwise by the City of Renton Community and Economic Development Administrator or
designee, from the first event triggering the requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the
date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk,
along with the required appeal fee, by 5:00 pm, September 20, 2024. Appeals must be submitted electronically
to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday.
The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal
is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance
Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding
the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Director
cc: Justin Johnson, Construction Engineering Manager
Nathan Janders, Development Engineering Manager
Scott Warlick, Engineering Specialist III
Holly Powers, Engineering Specialist III
Franchise Permits
Enclosures: Site Plan
APPROACH PLAN
LABOR:
AERIAL:
OVERLASH = 1788’
RISER = 50’
TOTAL POLES = 8
TOTAL AERIAL FOOTAGES = 1838’
UNDERGROUND:
BORE/TRENCH = 140’
ROD&ROPE = 848’
TOTAL UG FOOTAGES = 988’
PERMITS TO BE SUBMITTED:
POLE ATTACHMENT
CITY
TRAFFIC CONTROL PLAN
Legend
FIELD DATE 7/23/2024
Reference DG
JB-1824466
The Store-House Self Storage
2829 NE 3rd St Renton WA 98056
Place (N) SP0490.WAKV and
Tie-In (N) 96 ct fiber into (E)
SP.WAKV.0204
POLE 1: #318014/166567
(E) 25’ riser
POLE 2: #318023-166567
POLE 3: #318176-166583
POLE 4:
#318039-166606
(E) Ped
TCP 1
TCP 2
TCP 3
MFP24003983This permit is for Major construction work in the ROW and will be billed at an additional
$158/HR for inspections. After hours and weekend work will be billed at $175/HR
APPROACH PLAN
Legend
Reference DG
JB-1824466
The Store-House Self Storage
2829 NE 3rd St Renton WA 98056
POLE 7: 3..069-166708
Place (N) SP0491.WAKV 5’ E of
pole and Tie-In (N) 24 ct fiber
POLE 8: #318069-166708
PLACE (N) RISER ON (N)
BRACKETS W QUAD
POLE 5:
#318049-…….
POLE 6: #318061-166679
TCP 4
TCP 5
MFP24003983
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
APPROACH PLAN
Legend
Reference DG
JB-1824466
The Store-House Self Storage
2829 NE 3rd St Renton WA 98056
Splicing required at
SP WAKV.0120.
Located 30’ from East pole
Splicing required at
SP WAKV.0107.
Located 35’ from East pole
TCP 6
MFP24003983
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP24003983
Engineering
1 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
2 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15'-6".
3 A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
4 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the
Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the
Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or
(3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and
Economic Development Administrator or designee, from the first event triggering the requirement to underground
the aerial lines.
Page 1 of 1