Report
Talbot Substation Storrnwater Support
Puget Sound Energy
Renton, Washington
November 16, 2016
,('
1-)~
DEC O 6 2016
This page intentionally left blank.
Certificate of Engineer
The technical material and data contained in this report for the Puget Sound Energy Talbot
Substation Stormwater Support Project were prepared under the supervision and direction of
the undersigned, whose seal, as a professional engineer licensed to practice as such, is affixed
below.
Beth Peterson, P.E.
Project Manager
HDR Engineering, Inc.
/
This page intentionally left blank.
Technical Information Report 1-)"'
Talbot Substation Stormwater Support ~
Contents
Project Overview ............................................................................................................................... .
1.1 Existing Conditions ................. 1
1.2 Proposed Conditions ................... . .............. 2
2 Conditions and Requirements Summary ............................................................................................ 2
3 Off site Analysis .................................................................................................................................... 4
4 Flow Control and Water Quality Facility Analysis and Design ............................................................ 8
5 Conveyance System Analysis and Design ........................................................................................ 13
6 Special Reports and Studies ........................................................................................................ 13
7 Other Permits .................................................................................................................................... 13
8 CSWPPP Analysis and Design ......................................................................................................... 14
9 Bond Quantities, Facility Summaries, and Declaration of Covenant ................................................ 17
10 Operations and Maintenance Manual ..................................... . ... 17
11 References ......................................................................... . . ......... 17
Tables
Table 1: Existing Condition Acreage and Peak Flow Values ........................................................................ 8
Table 2: Proposed Condition Acreage and Peak Flow Values ..................................................................... 9
Table 3: Existing and Proposed Land Use Summary ................................................................................. 10
Table 4: Pre-developed and Proposed Controlled Flow Comparison... . ............................... 12
Table 5: Additional Project Permit Requirements ....................................................................................... 14
Figures
Figure 1: TIR Worksheet
Figure 2: Site Location
Figure 3: Drainage Basins, Subbasins, and Site Characteristics
Figure 4: Soils
Figure 5: Flow Chart for Determining Type of Drainage Review Required
Figure 6: Offsite Analysis
Figure 7: Existing Hydrology
Figure 8: Proposed Hydrology
Figure 9: Flow Chart for Determining Individual Lot BMP Requirements of the SWDM
Figure 10: Pond Sketch
November 16, 2016 I i
Technical lnforrnation Report
Talbot Substation Stormwater Support
Appendix A: Firmette
Appendix B: Drainage System Table
Appendix C: Site Photos
Appendices
Appendix D: Reference 11-A Flow Control Areas
Appendix E: Stormwater Model Output
Appendix F: Construction Stormwater Pollution Prevention Plan
Appendix G: Facility Summaries and Declaration of Covenant
Appendix H: Operations and Maintenance Manual
ii I November 16, 2016
Technical Information Report L 1
)"'\
Talbot Substation Stormwater Support r-; ~
1 Project Overview
1 .1
1.1.1
1.1.2
Puget Sound Energy (PSE) is proposing a series of improvements at their Talbot
Substation located in Renton, Washington. A copy of the TIR Worksheet (Figure 1) is
located below. Figure 2 below shows the site location and adjacent critical areas.
Proposed improvements will occur on the eastern side of the substation (referred to as
the project area), and will include the installation of foundations, security perimeter fence,
landscape screening, paving of a small portion of the access road, installation of a new
stormwater drainage and flow control system, road maintenance, and on-site oil spill
control best management practices (BMPs). The extent of disturbance will be
approximately 5.89 acres. Approximately 4.17 acres will consist of gravel road and
surface improvements. Another 1.22 acres will be for the installation of new foundations
and Spill Prevention, Control, and Countermeasures (SPCC) structures. The remaining
0.5 acres will be for installation of a stormwater detention pond. The existing site
contains electrical structures, and yard rock covers the ground surface. The existing and
proposed conditions as well as the site constraints are described below.
Existing Conditions
Topography
The Talbot substation covers approximately 7.75 acres between Beacon Way South,
South Puget Drive, and Grant Ave South in Renton, Washington, as shown in Figure 2.
The site is located near the top of a ridge and is primarily accessed from South Puget
Drive, which ties into a gravel driveway leading to the site. The topography inside the
substation slopes slightly away from the center to promote drainage away from electrical
equipment. The existing grade outside the substation fence generally slopes away from
the substation except on the eastern and northwestern sides where there is elevated
terrain.
Drainage
In general stormwater runoff flows outwards from the middle of the substation. Existing
drainage pipes on the northeast and southeast sides of the substation are tied to catch
basins within the fence line whose rims are slightly raised above the yard rock,
preventing them from capturing flow. The perimeter path on the northeastern side of the
substation is higher than the existing grade within the fence line, preventing flow from
draining off the site along this edge. An elevated field along the eastern edge of the site
prevents drainage away from the substation on this side. Runoff along the northeastern,
eastern, and southeastern sides of the substation therefore tends to pond within the
substation and infiltrate. Along the southern edge of the substation, runoff is able to flow
south across the southern perimeter path and into a depression located between the
substation and access road. This route presents the path of least resistance for
stormwater. The depression is drained by a culvert beneath the access road to a second
depression which drains eastwards, towards Grant Avenue South. Existing drainage
patterns are shown in Figure 3. Existing soil types can be found on Figure 4.
November 16, 2016 I 1
2009 Surface Water Design Manual
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
KING COUNTY, WASHINGTON
SURFACE WATER DESIGN MANUAL
REFERENCE 8-A
TECHNICAL INFORMATION
REPORT (TIR) WORKSHEET
119/2009
KING COUNTY, WAS!IINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER
Project Owner Puget Sound Energy
Phone 425-456-2127
Address _.,,3"'-5"'-5----'1---'-1-"'0t"-h'---'A---'-v'--'e"---'---'N--=E"----
Bellevue, WA 98004
Project Engineer Chris Russell
Company Puget Sound Energy
Phone Puget Sound Energy
Part 3 TYPE OF PERMIT APPLICATION
D Landuse Services
Subdivison / Short Subd. / UPD
D Building Services
M/F / Commerical / SFR
D Clearing and Grading
D Right-of-Way Use
D Other
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report
Type of Drainage Review @Di Targeted
(circle) Large Site
Date (include revision
dates):
Date of Final:
Part 6 ADJUSTMENT APPROVALS
I
Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Name Talbot Stormwater Support
DDES Permit# ----------
Location Township 23 N
Range 5 E
Section --"'20=------
Site Address 1601 Seagull Drive, Renton, WA 98055
Part 4 OTHER REVIEWS AND PERMITS
D DFWHPA
0 COE404
D DOE Dam Safety
D FEMA Floodplain
D COE Wetlands
D Other __ _
D Shoreline
Management
D Structural
RockeryNaultl __
D ESA Section 7
Site Improvement Plan (Engr. Plans)
Type (circle one): <@))1 Modified I
Small Site
Date (include revision
dates):
Date of Final:
Type (circle one): Standard I Complex I Preapplication I Experimental/ Blanket
Description: (include conditions in TIR Section 2)
Date of Annroval:
2009 Surface Water Design Manual 1/912009
1
KING COUNTY, WASHINGTON, SLRl'ACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No Describe:
Start Date:
Completion Date:
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan:~-------------
Special District Overlays:--------------------------
Drainage Basin: _D_uw_a_m_is_h_R_iv_er __________ _
Stormwater Requirements: Core Requirements# 1 through #8 of the City of Renton Amendment to the 2009 King County
Surface Water Desi n Manual
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
D River/Stream _________ _
D Lake
D Wetlands __________ _
D Closed Depression --------
D Floodplain-----------
D Other ___________ _
Part 10 SOILS
Soil Type Slopes
AmC -Arents, Alderwood material 6 to 15%
AgC -Alderwood gravelly sandy loam 8 to 15%
AgD -Alderwood gravelly sandy loam 15to30%
D High Groundwater Table (within 5 feet)
D Other
D Additional Sheets Attached
2009 Surface Water Design Manual
2
lif Steep Slope ________ _
!if Erosion Hazard _______ _
Gl Landslide Hazard _______ _
~ Coal Mine Hazard _______ _
Gr Seismic Hazard --------
D Habitat Protection--------
D ---------------
Erosion Potential
Low (Kfactorof0.10}
Low (K factor of 0.10)
Low {K factor of 0.10)
D Sole Source Aquifer
D Seeps/Springs
1/9/2009
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE LIMITATION/ SITE CONSTRAINT
D Core 2 -Olfsite Analysis
D Sensitive/Critical Areas
D SEPA
D Other
D
D Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summarv Sheet oar Threshold Discharae Area)
Threshold Discharge Area:
(name or description)
Core Requirements (all 8 apply)
Dischar;ie at Natural Location Number of Natural Discharae Locations: 1
Olfsite Analysis Level: (.j_) 2 I 3 dated: Janua!:J:: 18th 1 2016
Flow Control Level: (.j_J 2 / 3 or Exemption Number
(incl. facilitv summarv sheet) Small Site BMPs
Conveyance System Spill containment located at: Around transformers on site
Erosion and Sediment Control ESC Site Supervisor:
Contact Phone:
After Hours Phone:
Maintenance and Operation Responsibility: V-'rivato'> / Public
If Private, Maintenance Loa Reauired: Yes / No
Financial Guarantees and Provided: Yes / No
Liabilitv
Water Quality Type: Basic / Sens. Lake / Enhanced Basicm / Bog
(include facility summary sheet) or Exemption No. Surface area exemption number 1.
Landscape Manaaement Plan: Yes / No
Special Reciuirements (as annlicablel
Area Specific Drainage Type: CDA / SDO I MOP/ BP/ LMP / Shared Fae.• None '>
Requirements Name:
Floodplain/Floodway Delineation Type: Major / Minor / Exemption /~
100-year Base Flood Elevation (or range):
Datum:
Flood Protection Facilities Describe: None present
Source Control Describe landuse: NIA
(comm./industrial landuse) Describe any structural controls: NIA
2009 Surface Water Design Manual 1/9/2009
3
KING COUNTY, W ASIIINGTON, SURFACE WAT LR DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Oil Control High-use Site: Yes" No )
Treatment BMP:
Maintenance Agreement: Yes~
with whom?
Other Drainaae Structures
Describe: Oil spill prevention, containment, and control structures will be placed around electrical facilities which employ oil.
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION AFTER CONSTRUCTION
ri:f Clearing Limits 0 Stabilize Exposed Surfaces
[if" Cover Measures 0 Remove and Restore Temporary ESC Facilities
ri:f Perimeter Protection [if" Clean and Remove All Silt and Debris, Ensure
[if" Traffic Area Stabilization Operation of Permanent Facilities
ri:f Sediment Retention 0 Flag Limits of SAO and open space
ri:f Surface Water Collection
preservation areas
0 Other 0 Dewatering Control
0 Dust Control
[if" Flow Control
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summarv and Sketch)
Flow Control Tyoe/Descriotion Water Quality Tvne/Descriotion
~ Detention Detention pond 0 Biofiltration
0 Infiltration 0 Wetpool
0 Regional Facility 0 Media Filtration
0 Shared Facility 0 Oil Control
0 Flow Control 0 Spill Control
BMPs 0 Flow Control BMPs 0 Other 0 Other
2009 Surface Water Design Manual
4
1/9/2009
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS
D Drainage Easement 0 Cast in Place Vault
D Covenant D Retaining Wall
D Native Growth Protection Covenant D Rockery> 4' High
D Tract D Structural on Steep Slope
D other D Other
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
incorporated into this worksheet and the attached Technical Information Report. To the best of my
knowledge the information provided here is accurate.
Sinned/Date
2009 Surface Water Design Manual 1/9/2009
5
This page intentionally left blank.
1
LEGEND r·--· •
1
1 Project A re a .....
Roads
,.;'\,--Stre ams
[ZJ
Coalmine
Hazard
Area
Wetlands
Landslide Haza rd
Steep Slo pes
DATA SOURCE: City of Renlon.
King Courty (2016)
Feet 500
~ )~ SITE LOCATION
FIGURE 2
PA™ O:'lf'JtOJECT1\WASHINOTONIP'VOn_ SOUNO_EMEROY _0070121TA.L &OT_STORMWATE"-SUf'PORT_2CttHU,!AP _OOCS'OftAFnTIR F IOUFID'#IOUl':li_2 _S1TI_I..OCATION.MXO -USIEft: T.IHOl"l"M.1 · DATE 11M"2011 STORMWATER TIR
I L:] P roje ct A rea
Contours -
I 10ft l nterva l
E xis tin g
~ -Flow Path
I~ ~ri~0
::~
Exi st ing
=-=> Drainage
Inf ras tructu re
Pro p osed
---Dra ina ge
Infrastruc ture
c'--. Proposed
I (__./ Detenti on Po nd
~ Pon ded Wat er I • Observ e d During
I Fie ld V is it
DATA SOUR C E: C ity cJ Renton, I King County (2016)
,~ l~ 'i 0 Feet 250
DRAINAGE BASINS, SUBBASINS, AND SITE CHARACTERISTICS
FIGURE 3
PATH; 0 I.PAOJEC TI\WASHIHOTON\f"OOfl_SOUNO_ENEROY_0070lllTALIOT_STORMWATER_SUPPORT_M ttM\MA P _OOCIIDRA,CTIT IR ,:IQUR&iS\HQU~_3_0 RAlNAQli MXO UH:A. TAHOF'FMA • OATli 11 /lt/2011 STORMWATE R TIR
LEGEND
1--..
'---' Proj ect Area
C] Soil Group
Roads
D ATA SOURCE : USDA web So<! Survey,
King County
&
0 Feet 190
1-)~
Pit. nt: C:IPROJECTS \WASHING TONIPVG!T _SOUNC_ENERGY _c.o1on,TALBOT_STOftMWA T'ER_SUPPORT_2HHS\MA.P _OOCS'ORAl'nffl ,iou lU!SV'IGUftl!:_ ._SOrt.S.MJlO . US!!\ TA.HO,,M.A .. DA.TE: t1/1 l f2()1C
SOILS
FIGUR E 4
STORMWATER TIR
Technical Information Report
Talbot Substation Stormwater Support
1.2 Proposed Conditions
Proposed conditions will include a re-graded gravel surface within the substation
(approximately 3.43 acres), additional SPCC structures and equipment foundations
(approximately 1.22 acres), re-grading of gravel and asphalt roads (approximately 0.74
acres), and the addition of a pond for flow control (approximately 0.5 acres). The
proposed conditions will increase impervious area at the site by approximately 15%. This
percentage is primarily due to the addition of the SPCC structures and equipment
foundations, as well as asphalt entries to the gravel access driveways. Yard rock
surfaces will only be replaced or re-graded, they will not be added.
The gravel surface inside the fence line of the substation will be re-graded to smooth any
slight depressions in the gravel, promote flow to catch basins, and subsequently limit
ponding around electrical equipment and structures. The proposed improvements will not
significantly modify the grade of the existing substation or access roads.
The impervious SPCC structures and equipment foundations will be added within the
substation fence. The asphalt surface will be added at the intersection of the gravel
access way and South Puget Drive.
Drainage improvements include a new stormwater conveyance network inside the
substation which will route flows to a 75,000 cubic foot stormwater detention pond
located along the southeastern edge of the substation. This pond will discharge to a
depression on the southern side of the existing access road, where flow will resume the
existing drainage path towards Grant Avenue South. Proposed drainage facilities can be
found on Figure 3.
Landscape screening will be installed along the southwest side of the substation property
border and the perimeter of the pond. Landscaping will replace non-native plant cover
such as blackberry shrubs and non-native grasses.
2 Conditions and Requirements Summary
The project is subject to the City of Renton Amendments to the 2009 King County
Surface Water Design Manual (KCSWDM), as well as the City of Renton Municipal
Code. According to Section 1.1.1 of the City of Renton Amendments to the KCSWDM
(COR SWDM), projects resulting in 2,000 square feet or more of new impervious
surface, replaced impervious surface, or new plus impervious surface, or 7,000 square
feet or more of land disturbing activity require a Drainage Review. Additionally, per
Section 1. 1.2 of the COR SWDM projects which result in greater than 2,000 square feet
of new impervious surface and greater than 35,000 square feet of pervious surface are
required to perform a Full Drainage Review. Figure 5 contains the Flow Chart for
Determining Type of Drainage Review Required and shows that the project requires a
Full Drainage Review. Projects undergoing a Full Drainage Review must meet the Core
Requirements and Special Requirements contained in the COR SWDM. These
requirements are broken down and discussed in greater detail below.
2 I November 16, 2016
Technical Information Report L "\~
Talbot Substation Stormwater Support r J'~
2.1 Core Requirement #1 : Discharge at the Natural
Location
Proposed projects must discharge runoff at the natural location and comply with the
discharge requirements of Core Requirement #1. The proposed stormwater detention
pond which collects runoff from the conveyance system within the substation discharges
to the natural discharge location, as shown on Figure 3. Per the discharge requirements
of Core Requirement# 1, if the proposed 100-year flow event peak discharge is greater
than 0.5 CFS a conveyance system must be provided to convey concentrated runoff to
an acceptable discharge point (COR SWDM, 2009). The 100-year peak flow event for
the proposed project is larger than 0.5 CFS, and will be routed through the proposed
conveyance system and stormwater detention pond to the natural discharge location.
The proposed stormwater detention pond will control stormwater flows generated by the
substation and discharge at a rate that meets the flow control regulatory requirements.
2.2 Core Requirement #2: Offsite Analysis
Core Requirement #2 is discussed in detail in Section 3 of this report.
2.3 Core Requirement #3: Flow Control
Core Requirement #3 is discussed in detail in Section 4 of this report.
2.4 Core Requirement #4: Conveyance System
Core Requirement #4 is discussed in detail in Section 5 of this report.
2.5 Core Requirement #5: Erosion and Sediment Control
Core Requirement #5 is discussed in detail in Section 8 of this report.
2.6 Core Requirement #6: Maintenance and Operations
Core Requirement #6 is discussed in detail in Section 1 O of this report.
2.7 Core Requirement #7: Financial Guarantees and
Liability
Core Requirement# 7 is discussed in detail in Section 9 of this report.
2.8 Core Requirement #8: Water Quality
The project site qualifies for the Surface Area Exemption detailed in Section 1.2.8 of the
COR SWDM (City of Renton, 2009).
• Less than 5,000 square feet of new PGIS that is not fully dispersed will be added
and
November 16, 2016 I 3
Technical Information Report
Talbot Substation Stormwater Support
• less than 5,000 square feet of new plus replaced PGIS that is not fully dispersed
will be created as part of a redevelopment project and
• less than 35,000 square feet of new PGPS that is not fully dispersed will be
added.
Because this project adds less than 5,000 square feet of PGIS and less than 35,000
square feet of new PGPS, water quality facilities are not required at the project site.
2.9 Special Requirement #1 : Adopted Area Specific
Regulations
2.10
2.11
2.12
2.13
This requirement is not applicable as there are no adopted area specific regulations
within the project area.
Special Requirement #2: Flood Hazard Area
Delineation
This requirement is not applicable as the project area is not within or adjacent to a
mapped FEMA flood hazard area. The FIRMETIE (a web-based software program
designed to display mapped FEMA floodplains) for the project area can be found in
Appendix A.
Special Requirement #3: Flood Protection Facilities
This requirement is not applicable as the proposed project does not rely on an existing
flood protection facility or plan to modify or construct a new flood protection facility.
Special Requirement #4: Source Controls
This requirement is not applicable as the proposed project does not require a commercial
building or commercial site development permit.
Special Requirement #5: Oil Control
This requirement is not applicable as the proposed project does not have high use
characteristics. It should be noted that Spill Prevention, Containment, and Control
(SPCC) facilities will be installed around some electrical components which employ oil.
· 3 Offsite Analysis
A Level 1 Analysis was performed to identify any potential drainage, conveyance, or
environmental issues downstream of the site that could be affected by the project and
require an additional level of analysis. The Level 1 Analysis consists of a resource review
and a field inspection where offsite issues are identified. The resource review provides
information regarding large-scale existing issues in the project area prior to a site visit.
During the field inspection, evidence of on-site and off-site drainage issues or other
4 ] November 16, 2016
Technical Information Report 1-)"'
Talbot Substation Stormwater Support ~
environmental problems are investigated and reported. The scale of the resource review
and the field inspection are defined by the downstream study area.
3.1 Task 1: Study Area
The study area and extent of the downstream analysis can be found on Figure 6. The
USGS StreamStats application in tandem with existing topographic and stormwater
conveyance data were used to define the downstream drainage path leaving the project
site. As mentioned in Section 1.1.2 above, stormwater runoff exits the project site via the
southern side of the substation, passing beneath the access road and eventually flowing
west towards Grant Avenue South.
The study area for Task 2 is required to ex1end 1 mile downstream of the project
discharge location per Section 1.2.2.1 of the COR SWDM. The study area is required to
extend upstream if backwater or upstream effects are anticipated, however the
substations location near the top of a ridge precludes any of these effects. The study
area for Tasks 3 through 5 must extend to a point where the proposed project area
extends less than 15% of the total tributary drainage area, but not less than one-quarter
mile downstream of the project area. StreamStats was used to delineate and calculate
the area of the watershed, and then determine at what distance the project area
composed less than 15% of the tributary drainage area. This distance was less than the
minimum distance, one quarter mile and therefore one quarter mile was used for the
extent the study area used in Tasks 3 through 5.
3.2 Task 2: Resource Review
The resource review was conducted according to Section 2.3.1.1 of the COR SWDM.
Information required to be reviewed includes FEMA Maps, presence of sensitive areas,
presence of wetlands, presence of nearby 303d listed waters, soil survey information,
adopted basin plans, and offsite analysis reports for other projects. The information
obtained during the review is detailed below.
Adopted basin plans were not available for the project area as of September 2016.
FEMA floodplain information was referenced from the online FEMA Flood Map Service
Center. The project site is not located within a flood hazard area. The FIRMETTE which
includes the project area is located in Appendix A.
King County iMap data indicates that the project area is located inside a Coal Mine
Hazard Area and adjacent to an Erosion Hazard Area. City of Renton GIS data was also
analyzed, and shows that environmentally sensitive or critical areas located near the
project area include erosion hazard areas and landslide areas (Figure 2). The closest
high-risk erosion hazard area is approximately 1,400 ft west/southwest of the site.
Moderate hazard landslide areas are present on the south, southwest, and west sides of
the project site. The closest high hazard landslide area is approximately 2,000 feet west
of the site. The project area will not discharge directly to any erosion or landslide hazard
areas.
King County iMap data indicates drainage complaints approximately three quarters of a
mile west of the project area, adjacent to 1-405. The registered complaints were for
November 16, 2016 I 5
Technical Information Report
Talbot Substation Stormwater Support
garbage dumping. The stormwater discharge from the proposed project area should not
have an effect.
Sensitive surface waters reviewed included wetlands and impaired waters. City of
Renton Wetland Inventory maps for the area do not show wetlands within one mile
downstream of the site. Additionally, following a review of the Department of Ecology's
303d list of impaired waters, no impaired waters were found within one mile downstream
of the site.
Seven borings were performed as part of a geotechnical study at the project area. Five of
the borings were performed inside of the substation, and these discovered several feet of
fill soils overlaying seven to twenty-three feet of glacial till. In the area of the proposed
stormwater detention pond, two borings were performed which discovered several feet of
loose sand and organic topsoil overlaying glacial till. Advance outwash deposits were
found below the till soils in all boring samples. No groundwater was encountered at the
project site (GeoEngineers, 2016).
King County iMap does not identify any stormwater quality problems within the study
area.
No Basin Plans or Basin Reconnaissance Summary Reports were found for surface
waters downstream of the project site, and no nearby offsite analysis reports were
obtained as of September 2016 from the City of Renton Development Services Division.
Existing and potential problems identified above have been tabulated in the Drainage
System Table, located in Appendix B.
3.3 Task 3 through 5: Field Inspection & Results
The field inspection was conducted on January 18th, 2016 at the project area and the
study area within V. mile downstream of the site. The inspection focused on areas
identified in the resource review and in previous site visits, such as steep slopes and
erosion hazard areas. The purpose of the inspection was to note any erosion or
sedimentation, evidence of recurrent flooding, conveyance system issues, or other
drainage issues present, as well as observe existing site conditions and verify the
tributary drainage basin of the project site. Site photos taken during the visit are found in
Appendix C. It is important to note that the field inspection took place following 0.92
inches of rainfall in the two days prior to the visit, so wet weather conditions were
observed.
Land use immediately adjacent to the site is primarily undeveloped. Areas to the east
and west of the substation consist of tall grasses with interspersed shrubs, and the area
south of the site consists of moderate to dense trees and shrubs. Grasses surround the
north side of the site, with moderate to dense tree and shrub cover north of the grassy
areas. The closest developed area downstream of the site is a residential development
approximately 400 feet south of the site. A park lies between the residential development
and the substation, and consists of lawn grass and some taller grasses around the
border. South of the park is more undeveloped grassy and forested area, with a
maintained mountain bike trail in the forested area. A small stream or channel was
observed crossing the trail via a culvert. The stream appeared to end in the grass area to
6 I November 16, 2016
Technical Information Report L 1111\9\
Talbot Substation Stormwater Support r J'~
the southwest where it converted to overland flow or infiltrated. No erosion or scour
problems were identified in this area.
To the east of the project area, the grade gradually slopes upward towards a ridge
between the substation and Beacon Way South (gravel road). South of the project area
and to the west of the gravel access road the topography is relatively flat. A slight
depression is present east of the access road which extends beyond the SE corner of
the substation. The west side of the substation is bounded by an approximately 10-ft
wide flat area and small ridge. West of the ridge, the grade becomes much steeper.
Runoff from the substation is constrained from reaching the steep slope by the ridge
feature. The ridge ends just before the southwest corner of the site, where a steep
access path leads southwest towards a transmission line tower. To the north of the
substation is relatively flat ground with areas of ponding. One depression is present near
the NE corner of the site. Two small ponded areas are present along the north edge of
the site. No outlets were observed from the ponded areas.
Topography downstream of the site consists of gradual slopes across a park and
moderate slopes to the west and southwest through forested and grassy areas. A gravel
access road intersects an undeveloped area between the park and the substation and
leads to a low area south of the road near the tower at the southwest corner of the
substation. The low area was identified as an additional area that would likely capture
runoff from the substation. The access road continues over a small ridge. Runoff that
escaped the low area would enter a forested section crisscrossed with mountain bike
paths. Many small depressions were observed along the mountain bike paths. Further
downstream is a grassy area west of the park. Moderate slopes continue across the
grassy area to Grant Avenue South, approximately V. mile downstream of the site.
Despite the steep slopes and paths on the west and south sides of the site, no rills or
signs of erosion or sedimentation were present during the field inspection of on-site and
off-site areas. Additionally, no evidence of recurrent flooding was present in the area.
Ponded areas were small, no overtopping of those areas was apparent, and water levels
were fairly low within the depressions despite the recent precipitation. These
observations suggest that the on-site and off-site areas do not suffer from erosion or
flooding drainage problems which could warrant additional flow control for the project.
Conveyance observed off-site in the downstream drainage path during the inspection
included two culverts. The outlet of a 4" PVC culvert was observed in a depression on
the south side of the site between the access road and substation. No water was flowing
in the culvert during the time of the inspection. The second culvert (4" PVC) was
observed with flow present underneath a section of the mountain bike trail southwest of
the site (Figure 6). About 200 feet downstream of the culvert, the flow converted into
overland flow through a grassy area. No flooding or erosion issues were observed
around the culvert.
Based on the observations made during the field inspection, no downstream drainage
problems -such as conveyance, flooding, or erosion issues -could be identified for the
project area or downstream drainage path within V. mile of the project area. Field
observations also verified the drainage basin delineation discussed in Section 1. The
lack of downstream drainage problems confirms that a Level 1 Analysis is sufficient for
the study area.
November 16, 2016 I 7
SECTION I. I DRAINAGE REVIEW
FIGURE 1.1.2.A FLOW CHART FOR DETERMINING TYPE OF DRAINAGE REVIEW REQUIRED
Is the project a single family residential project that results in :2:2,000 sf of SMALL PROJECT DRAINAGE
new and/or replaced impervious surface or ;;,,-7,000 sf of land disturbing REVIEW
activity, AND meets the following criteria? Sec;lion 1.1.2.1
• The project results in :-;;S,000 sf of new impervious surface, and .,;35,000 Nollo: The pro/eCt may also be sf of new pervious surface sul)Jact to Targeted Drainage
RevitlW 8$ /1et&nrlined below.
Yes
Nol l
Does the new or redevelopment Does the project have the characteristics of one or more of the following
project result in ~2.000 sf of new categories of projects (see more detailed threshold language on p. 1-13)?
and/or replaced impervious surface or 1. Projects containing or adjacent to a flood, erosion, or steep slope
~35,000 sf of new pervious surface? hazard area or documented drainage problem; projects within a
landslide hazard area or landslide hazard drainage area; or
No projects that propose ~7,000 sf (1 ac if project is in Small Project -Drainage Review} of land disturbing activity.
2. Projects proposing to construct or modify a drainage pipe/ditch that
is 12" or larger or receives runoff from a 12" or larger drainage
pipe/ditch.
Yes No/ Yes i
Reassess whether :. ·••··. ··if'<;~·
drainage review is r~1tfl*•Jlt& ·,e;.
required per Section
•.: .. _· . '"-,,:; _,, : f,( . ~_:.,,; _;-.·.
1.1.1 (p. 1-8).
. .; ·.·
I ·I
Does the project result in ;;;:50 acres of new impervious ~=~~ surface within a subbasin or multiple subbasins that are No
hydraulically connected? ;:;,.· ; . · .. ·''{:. ',.
Yes
1.jn~
I• ,,
···: · ___ . . ·,\·;; : . -. • ,; :: ' /Ci:' ..
City of Renton 2009 Surface Water Design Manual Amendment
1-10
This page intentionally left blank.
1 • • •1 ProjectArea
I,, • • I c::J Task 2 Study A rea
c::J Task 3 , 4 , and 5 St udy Area ~
Pa rcel ~
Boun d a ry
Contours -
10 ft I nterval
Approx imate Ii ~~ D rai nage P at h
~ Wetla nd
Hazard Area """ ~ f D Steep Slope
Is,,
~ D E rosion
...Q
t.\11 ~ l_J La ndsl ide
A
1-)~ Note :
Task 2 St udy A rea Inclu des t he D ownste ram Flow P ath 1 M ile D ownst ream of t he P roject A rea
Tasks 3 through 5 P roj ect A rea I ncludes th e Do w nstream Fl ow P ath 1 /4 M ile Downst ream of t he P roj ect A rea
PllliTH: Q:\PA.OJICTStWASHINGTON#UOl!T_SOUNO_!N! .. O'l'_OOT02l\TALBOT_STOftMWAT!:l'\_SU"'°l'tT_2HHI\MAP _OOCS"°"Al'TITlfl FIQIUl'l:lSU'IGUR!_I _OFFS IT(_ANALTSIS.MXD · USER: TAHOFJIMA • DAT£: 1111'1201$
OFFSITE ANALYSIS
FIGU R E 6
STORMWATER TIR
Technical Information Report
Talbot Substation Stormwater Support
4 Flow Control and Water Quality Facility
Analysis and Design
4.1 Existing Site Hydrology
The existing condition hydrologic analysis assumed that stormwater runoff within the
project area was confined to one subbasin which drains to the depression located on the
southwestern corner of the project area. Drainage characteristics of the site are
discussed in greater detail in Section 1.1.2 of this report. Subbasin area and drainage
characteristics can be seen on Figure 7. Existing land cover is primarily yard rock with
electrical equipment foundations throughout the site. Existing hydrology was calculated
based on a pre-developed forested condition as the project area is located within a
designated Flow Control Area per Reference 11-A of the COR SWDM (Appendix D).
Existing condition peak flow values were calculated using the KCRTS modeling software.
Existing acreage input to the KCRTS model and model results can be found in Table 1,
below.
Table 1: Existing Condition Acreage and Peak Flow Values
Pre-Developed Forested
5.89 Acres Condition Area
Peak Flow Event Discharge (CFS)
2-Year 0.16
5-Year 0.28
10-Year 0.29
25-Year 0.37
SO-Year 0.44
100-Year 0.48
4.2 Proposed Site Hydrology
Changes to the existing land cover include removal of existing electrical equipment and
the addition of new concrete equipment foundations, placement of new yard rock within
the facility, and addition of a new stormwater detention pond (Figure 8).
The yard rock is considered a partially impervious surface while all other improvements
are considered impervious surfaces. Per Table 3.2.2.E in the 2009 KCSWDM, yard rock
(gravel) surfaces must be multiplied by an effective impervious fraction of 0.50 to
determine the impervious percentage of yard rock (gravel) surfaces. The remaining
fraction is considered pervious.
8 I November i6, 2016
This page intentionally left blank.
t
LEGEND
1 Project Area
__ 1 Subbasin Bou nda ry
c::':!.(
~-};;)
Contours -
5 ft I nterval
Ponded Water Observed
Duri ng Fie ld Visit
Drainage
Infrastructure
Approximate
II llli"~ Dra i nage Path
0
Drainage Path
Roads
&
Feet 200
1-)~
PATH: O:'IPROJECTS'.WA$MINQTON\PUQU_sooNO_EHEROY _0070UITAl 8 01_STORMWATEl'\_IUPPO"T-2HtH\M,I.P _OOCS'.Oll:A,T'IT~ flOUftl!S\SIT!_HYOll:OLOGYMXO • USER . TA HOFFMA • OAff: 1111 11201,
EXISTING SITE H YDRO LOGY
FIGURE 7
STORMWATER TI R
Technical Information Report L "\"\
Talbot Substation Stormwater Support r .,,
Proposed condition peak flow values were calculated using the KCRTS modeling
software. Proposed acreage input to the KCRTS model and model results can be found
in Table 2 below.
Table 2: Proposed Condition Acreage and Peak Flow Values
Proposed Condition
5.89 Acres Area
Peak Flow Event Discharge (CFS)
2-Year 1.11
5-Year 1.20
10-Year 1.34
25-Year 1.44
SO-Year 1.98
100-Year 2.25
4.3 Performance Standards
The project area is located within a designated Flow Control Area per Reference 11-A of
the COR SWDM (Appendix D) and is subject to the Flow Control Duration Standard for
forested conditions.
No drainage problems have been identified within the limits of the offsite analysis
(discussed in detail in Section 3), so proposed conditions must match the flow durations
for pre-developed, forested rates over the range of flows from 50% of the 2-year up to
the full 50-year per Table 1.2.3.A of the COR SWDM (COR SWDM, 2009). Flow control
facilities are required, as the project contains greater than 2,000 square feet of new plus
replaced impervious surface. In Flow Control Duration Standard areas, these facilities
must mitigate for target surfaces including:
• New impervious surface that is not fully dispersed,
• New pervious surface that is not fully dispersed,
• Replaced impervious surface that is not fully dispersed on a parcel
redevelopment project in which the total of new plus replaced impervious surface
is 5,000 square feet or more.
November 16, 2016 I 9
This page intentionally left blank.
f-~~,.,... .... ~
LEGEND
Project A rea
~ 1 ___ 1 Subbasin Boundary
I Contours -~ 5 ft Interval f Drainage ! Infrastructu re
Approximate
llii"~ Dra i nage Path
Dra i nage Path
Roads
c-z._ Proposed
(___,/ Detention Pond
A
Feet 200
1-)~ PROPOSED S IT E HY DRO LO GY ~ F IGURE 8
NTH: Q '.PROJt:CT$tWA.SHNGTON\PUGET_SOUNO_l:NE.RCY_0010U\TA.LIOT_STOIUIIWAT!R_SUP9'0RT_MUU\MAP_OOC::S'MA,T\T" f'IOUMS\SITl!_HYDl'IOLOOVtUO · USU{: TAHO FFMA • OATII!: 1111tl?011 STORMWATER TIR
Technical Information Report
Talbot Substation Stormwater Support
Flow control facilities and design are discussed in detail in Section 4.4. The NPGIS and
pervious areas in Table 3 reflect the division of area covered by yard rock.
Table 3: Existing and Proposed Land Use Summary
Impervious
Pervious Total
NPGIS PGIS
Existing 3.33 0.00 2.56 5.89
New 0.50 0.00 0.00 0.50
Replaced 3.33 0.00 2.06 5.39
Percent 65%
Impervious
Flow control BMPs must be provided to either supplement the flow mitigation provided by
flow control facilities or provide flow mitigation where flow control facilities are not
required (SWDM, 2009). These BMPs must be selected as directed in Section 5.2 of the
SWDM. The proposed project area must meet the large lot high impervious BMP
requirements listed in Section 5.2.1.2 of the SWDM as the project area is larger than
22,000 square feet and the impervious surface coverage is greater than 45% of the
project area. Figure 5.2.1.A Flow Chart for Determining Individual Lot BMP
Requirements of the SWDM is shown in Figure 9 below.
1 O I November 16, 2016
SECTIOK 5.2 FLOW CO"ITROL BMP REQUIREMENTS
FIGURE 5.2.1.A FLOW CHART FOR DETERMING INDIVIDUAL LOT BMP REQUIREMEI\TS
Is the project on a site/lot I Yes Is it feasible and
smaller than 22,000 square feet? I applicable to
implement full Yes No further BMPs
Apply one or more of the following to impervious area dispersion for the required. Note:
;;:.10% of site/lot for site/lot sizes <11,000 sf and .a 20% of roof area as per Any proposed
site/lot for site/lot sizes betw"een 11,000 and 22,000 sf (For Section C.2.1? connection of roof
projects located in critical aquifer recharge areas these
No i downspouts to
impervious area amounts double): local drainage
1. Limited Infiltration (Section C.2.3)
Is it feasible
system must be
2. Basic Dispersion (Section C.2.4) via perforated
3. Rain Garden (Section C.2.5) and applicable pipe connection
4. Permeable Pavement (Section C.2.6) No to implement
Yes per Section
5. Rainwater Harvesting (Section C.2.7) full infiltration C.2.11. No 6. Vegetated Roof (Section C.2.8) of the roof
7. Reduced Impervious Service Credit (Section C.2.9) runoff as per
8. Native Growth Retention Credit (Section C.2.10) Section C.2.2?
I
s me pr0Jec1 on a s,u,,nOt ...... ,uuu square 1eet
Yes Is it feasible and or larger with impervious surface
coverane of 45% or less? applicable to implement
full dispersion on all Yes
target impervious No further BMPs
surface as per required. Note:
One or more of the following BMPs must be implemented Section C.2.1? Any proposed
connection of roof
No for that portion of target impervious surface not addressed
No+ downspouts to local
with full dispersion or with full infiltration of roof runoff: drainage system 1. Full lnflltratlon (Section C.2.2 or Section 5.4) Is it feasible and applicable to must be via 2. Limited Infiltration (Section C.2.3) No implement full lnflltratlon of perforated pipe 3. Basic Dispersion (Section C.2.4) the roof runoff as per connection per 4. Rain Garden (Section C.2.5) Section C.2.2 or Section 5.4? Section C.2.11. 5. Permeable Pavement {Section C.2.6)
Yes res T 6. Rainwater Harvesting (Section C.2.7) _J 7. Vegetated Roof (Section C.2.8) +------Is there any remaining target
8. Reduced Impervious Service Credit (Section C.2.9) impervious surface not
9. Natlve Growth Retention Credit tSection C.2.10\ addressed with full dispersion or
I
with full infiltration of roof runoff?
The project must be a site/lot 22,000 square feet
Is it feasible and or larger with impervious surface
applicable to implement coverage of more than 45%? full dispersion on all
target impervious
No surface as per
Projects with impervious area greater than 45% and equal to or Section C.2.1?
less than 65% one or more of the following must be applied to an
Yes i impervious area greater than or equal to 20% of the site or 40% of
the target impervious surlace whichever is less OR for projects
greater than 65% impervious one or more of the following must be No further BMPs
applied to an impervious area greater than or equal to 10% of site required. Note:
or 20% of target impervious surface, whichever is less: Any proposed
1. Full Infiltration (Section 5.4) connection of roof 2. Limited Infiltration (Section C.2.3) downspouts to 3. Basic Dispersion (Section C.2.4) local drainage
4. Rain Garden (Section C.2.5) system must be
5. Permeable Pavement (Section C.2.6) via perforated
6. Rainwater Harvesting (Section C.2.7) pipe connection
7. Vegetated Roof (Section C.2.8) per Section 8. Reduced Impervious Service Credit (Section C.2.9) C.2.11. 9. Native Growth Retention Credit {Section C.2.1 O)
1/9/2009 2009 Surface Water Design Manual
5-12
Technical Information Report L """'
Talbot Substation Stormwater Support r ..,/~
The following list discusses each flow control BMP and its feasibility at the project area.
• Full Infiltration
o The project area lies over fill materials which are not suited for infiltration
BMPs.
• Limited Infiltration
o The project area lies over fill materials which are not suited for infiltration
BMPs.
• Basic Dispersion
a Existing topography on the northern and eastern edges of the project
area forms high ground and prevents stormwater runoff from exiting the
site. These higher areas would also restrict the vegetated flow path of a
basic dispersion BMP to several feet, below the acceptable value. The
eastern side of the project area is within the substation and bordered by
yard rock not suitable for dispersion BMPs as there is no vegetated flow
path and discharging stormwater within a substation is not
recommended.
• Rain Garden
a There is no space available within the project area for a rain garden. The
projects natural discharge location is located on the southern edge of the
project area, and the proposed stormwater detention pond which has
been designed to mitigate for all target surfaces within the project area
lies in that location. Existing topography surrounding the northern and
eastern edges of the site prevents placement of a rain garden in these
locations, and a rain garden could not be placed on the western edge of
the project area within the substation fence.
• Permeable Pavement
o No major paving activities are being proposed at the project area.
• Rainwater Harvesting
o The control house is the only structure with a roof that lies inside the
project area. Storage of rainwater associated with a rainwater harvesting
facility within the fence line of the substation is not feasible. There is also
no use for harvested rainwater at the project site, no plants require
irrigation and there are no facilities which may use harvested water.
• Vegetated Roof
o Vegetated rooftops within substation facilities are not feasible as the
required maintenance would involve getting on top of or near the top of
the roof surface in close proximity to high voltage power facilities.
November 16, 2016 I 11
Technical Information Report
Talbot Substation Stormwater Support
• Reduced Impervious Surface Credit
o Impervious surfaces have been restricted to the maximum extent
feasible. Permeable yard rock is being used where vehicle access is not
required within the substation fence. Impervious surfaces within the
project area include the proposed stormwater detention pond, electrical
and SPCC facilities, and the access road required for vehicles.
• Native Growth Retention Credit
o There are no native growth areas located within the project area.
The proposed flow control facility will mitigate for all target surfaces at the project area.
Proposed conveyance systems must be designed to convey the 25-year peak flow event
with a minimum 6 inches of freeboard to the structure grate. Developed conditions must
be assumed for onsite tributary areas, while existing conditions shall be assumed for
offsite tributary areas. For events greater than the 25-year peak flow, structures may
overlap. However, the 100-year peak flow event may not create or exacerbate any
existing severe flooding or erosion problem per Core Requirement #2 of the COR
SWDM. All overflows for peak flow events up to and including the 100-year event must
discharge to their natural discharge location at the project area.
Stormwater water quality treatment facilities are not required at the project area as the
total area of pollution-generating surfaces is below the water quality requirement
thresholds. SPCC structures will be installed around electrical components requiring oil
in order to prevent stormwater contamination in the event an oil spill. These are the only
water quality facilities which will be present at the project site.
4.4 Flow Control System
An illustrative sketch of the proposed stormwater detention facility can be found below
(Figure 10). KCRTS output containing "Compare Flow Duration" files and other model
results can be found in Appendix E. While there are landslide hazard areas adjacent to
the project, the project is not located within those areas and therefore is not required to
use a safety factor when designing the stormwater detention facility (SWDM, 2009).
Table 4 below compares the pre-developed condition discharge to the proposed
condition site discharge from the flow control facility.
Table 4: Pre-developed and Proposed Controlled Flow Comparison
Peak Flow
Discharge (CFS)
Event Existing Proposed from Flow
Control Facility
2-Year 0.16 0.09
5-Year 0.28 0.26
10-Year 0.29 0.28
25-Year 0.37 0.36
SO-Year 0.44 0.82
100-Year 0.48 1.04
12 I November 16, 2016
' i ---------------,.,,-
,/
/
/ //
' !
I ~
C
z
~
1-
. C>Q-' ~ !
'
,,
SJc; 0 ·..C. z . C 00 0 + C
i j=!
m --I J
~ 1
9
~
s,., j
• ..J '
"'!'? t -..-I
I
fa
It< ,j " w
I
.J)
\
..j
I -,-.,
-r.
I
i
9J
-..j
"1'.°". -,-
::r-r
s -· (:,..
-""
1
"'
.s~
IL>
<J\
b
f
S:!-
""' -~
~ ...... ,.., ., s
r
1R
Q_
}
"' ''; +
"' ~
J (\
'
i~;·: I· ,
Ii [ .c.+
I -. a,l,£1
I
. II.I J;Yl;I
t = tfl'h
t "P..,
.... vs
I> .., ' mo
-(1) -I (/J
ci:i'
:,
This page intentionally left blank.
Technical lnfonnation Report I-)"\
Talbot Substation Stormwater Support ~
4.5 Water Quality System
As mentioned above, stormwater water quality facilities are not required. SPCC facilities
will be placed where necessary.
5 Conveyance System Analysis and Design
During field observations, two four-inch outlet pipes and catch basins were observed at
the project area within the substation fence line at the northern and southern edges of
the substation. No further analysis was performed on the existing conveyance system.
The proposed stormwater conveyance system was designed to meet the conveyance
requirements discussed in Section 4.3 of this report and was analyzed using the Rational
Method and XP-SWMM. The Rational Method was used to assess the capacity of the
pipes within the conveyance system as required by the 2009 SWDM. XP-SWMM was
then used to demonstrate that the pipe system structures contain the hydraulic grade line
for the 25-year rainfall event as required by the 2009 SWDM.
The Rational Method conservatively calculates runoff flows based on basin area, rainfall
intensity, and a runoff coefficient specific to land cover. Runoff flows into each catch
basin were calculated for the 25-year event, and a water balance was performed to
estimate the flows which would need to be conveyed in each pipe. When the flows were
compared to the proposed conveyance system design pipe capacities, all proposed
pipes were sized appropriately to convey the 25-year event flows.
In XP-SWMM, conveyance system pipes were designed and modeled as 8-inch or 12
inch high density polyethylene (HOPE) pipe or perforated PVC pipe. Catch basins in the
conveyance system were either Type 1 or type 1 L. The conveyance system was
designed to route runoff from the substation, SPCC curb areas, and control house roof
toward the south side of the substation, where a pipe outfalls to the proposed detention
pond. Slopes of all proposed pipes in the conveyance system were modeled as 0.5%.
Compliance with the requirements discussed in Section 4.3 was assessed by routing 25-
and 100-year rainfall events through the XP-SWMM model. During the 25-year event, all
structures appeared to maintain over 6 inches of freeboard in the model. Additionally, the
hydraulic grade line was contained within the conveyance pipes. The conveyance
system did not flood during the 100-year event. Model output can be found in Appendix
E.
6 Special Reports and Studies
No special reports or studies have been prepared for this project.
7 Other Permits
Table 5 below lists additional permits required for the project area and their effects on the
stormwater design.
November 16, 2016 I 13
Technical Information Report
Talbot Substation Stormwater Support
Table 5: Additional Project Permit Requirements
Permit Agency Effects on Stormwater Design
TBD TBD TBD
TBD TBD TBD
8 CSWPPP Analysis and Design
A CSWPPP has been developed for the project and is located in Appendix F.
8.1 ESC Plan Analysis and Design
The following ESC best management measures will be employed at the project area, as
shown on the TESC plans and discussed in the CSWPPP:
8.1.1 Clearing Limits
8.1.2
8.1.3
To protect adjacent properties and reduce the volume of soil exposed to construction,
construction limits will be clearly marked where necessary before construction begins.
The construction of the proposed stormwater detention pond and paving of a small
portion of the existing access road will be the only ground disturbing activity occurring
outside of the substation fence. Natural vegetation and topsoil at the project area shall be
retained to the maximum extent feasible. High visibility fence and silt fence BMPs will be
used around the perimeter of the project area so that disturbance is kept to a minimum
outside the work area.
Cover Measures
As the project is located west of the Cascade Mountain Crest, no soils shall remain
exposed and unworked for more than seven days during the dry season (May 1 to
September 30) and two days during the wet season (October 1 to April 30). Between
these times, exposed soils stored aboveground shall be protected with straw, wood fiber
mulch, compost, plastic sheeting, or equivalent. Regardless of time, all soils shall be
stabilized at the end of the shift before a holiday or weekend, and if needed, based on
weather forecasts. Any areas expected to remain unworked for greater than 30 days
must be seeded or sodded (King County, 1998). During the wet season, soil stockpiles
with slopes greater than or equal to 3H:1 V, or with over ten feet of vertical relief must be
covered if they will remain unworked for over 12 hours. During the wet season sufficient
cover materials to stabilize all disturbed areas must be stockpiled on site, and the Wet
Season Provisions of Section D.5.S of the King County Erosion and Sediment Control
Standards must be followed (King County, 1998). Permanent stabilization will be
achieved by placement of yard rock within the substation, and seeding at the proposed
stormwater detention pond.·
Perimeter Protection
Vegetation and slope characteristics vary within the project area. The eastern edge of
the project area is elevated and there is no risk contaminated stormwater will exit the
project site in that area. The proposed stormwater detention pond and its outlet structure
will be installed along the southern edge of the project area. Silt fence will be installed in
this area to ensure no contaminated stormwater exits the project area. Silt fencing will
14 ] November 16, 2016
8.1.4
8.1.5
8.1.6
8.1.7
8.1.8
8.1.9
Technical Information Report 1-)""
Talbot Substation Stormwater Support ~
extend along the existing access road to its intersection with Puget Drive Southeast to
prevent sediment generated from the proposed paving activities from exiting the project
site. Concrete will be poured on site for proposed electrical equipment foundations within
the substation. All concrete at the project area will be handled such that no cementitious
material will enter stormwater runoff. Handling procedures are detailed on the TESC
plans.
Traffic Area Stabilization
The project area will be accessed from the existing access road located on the southern
edge of the substation. This access road is a stabilized surface and does not require
additional stabilization. Proposed stormwater detention pond construction and access
road paving will occur from the existing access road.
Sediment Retention
The proposed stormwater detention pond will be retrofitted as a temporary sediment
storage facility for the duration of the project. All open grate catch basins and inlets
located at the project area will be protected with storm drain inlet protection in order to
prevent sediment contamination from entering the conveyance system. The sediment
pond must have adequate surface area as defined in Section D.4.5.2 of the King County
Erosion and Sediment Control Standards (King County, 1998).
Required Pond Surface Area at top of Riser -SA= 2 x 0 2/0.00096
Proposed 2-year Peak Flow -0 2 = 0.092
Required SA= 192 Square Feet
Provided Surface Area: -16,000 Square Feet
Surface Water Collection
Outlet protection will be installed at the outlet of the proposed stormwater detention pond
before stormwater is routed through the facility.
Dewatering Control
Dewatering is not anticipated at the project site, as groundwater was not encountered
during field activities performed by GeoEngineers (GeoEngineers, 2016).
Dust Control
Wind transport of soils is not anticipated at the project site. Exposed soils will be
stabilized and will not remain exposed for long periods.
Flow Control
The project area triggers Core Requirement #3: Flow Control. The proposed stormwater
detention pond will be retrofitted to serve as a sediment pond during construction. During
this period, the hydraulic control structure and pond will continue to function as flow
control facility's and restrict flow rates exiting the site to acceptable limits.
November 16, 2016 I 15
Technical Information Report
Talbot Substation Stormwater Support
8.2 CSWPPP Plan Design
The following ESC best management measures will be employed at the project area, as
shown on the TESC plans and discussed in the CSWPPP:
• High Visibility Plastic Fence
o High visibility plastic fence will be used around the perimeter of the
substation and access road to clearly mark the proposed limits of
construction. This will prevent unnecessary disturbance of existing
vegetation and soils.
• Silt Fence
o Silt fence will be placed along the southern border of the existing access
road to prevent sediment contaminated stormwater generated from the
construction of the proposed stormwater detention pond and paving of
the existing access road from exiting the project site. Silt fence will also
serve to delineate the construction limits on the southern boundary of the
project area
• Temporary Sediment Pond
o The proposed stormwater detention pond will be retrofitted as a
temporary sediment pond. It will serve to retain sediment generated
within the substation fence by placement of the proposed foundations,
yard rock, and electrical components. The sediment pond will prevent
sediment from exiting the project area. Sediment retention facilities are
required whenever the project area exceeds three acres. Flow control is
also required for the project, and the proposed stormwater detention
pond will continue to regulate outflows through its control structure while
it is being used as a temporary sediment retention facility.
• Catch Basin Insert
o Catch basin inserts will be placed on all catch basins within the
substation fence line. They will be used to prevent sediment generated
by work within the substation fence line from entering the proposed
stormwater conveyance system and being transported downstream.
• Outlet Protection
o Outlet protection will be used at the outlet of the proposed stormwater
detention pond. It will prevent scouring and erosion due to stormwater
discharges exiting the pond. This is a permanent BMP which will be
retained in place after construction is complete.
Updates to the SWPPP may be requested by King County at any time during project
construction if the County determines that pollutants generated on the construction site
have the potential to contaminate surface, storm, or ground water.
16 I November 16, 2016
Technical Information Report L Ill\~
Talbot Substation Stormwater Support r .I~
9 Bond Quantities, Facility Summaries, and
Declaration of Covenant
9.1 Bond Quantities Worksheet
The Bond Quantities Worksheet is located in Appendix G.
9.2 Flow Control and Water Quality Facility Summary
Sheet and Sketch
The Flow Control and Water Quality Facility Summary Sheet and Sketch is located in
Appendix G.
9.3 Declaration of Covenant for Privately Maintained Flow
Control and WQ Facilities
Declaration of Covenant is not required for proposed privately maintained flow control
facilities.
9.4 Declaration of Covenant for Privately Maintained Flow
Control BMPs
There are no flow control BMPs present at the project area.
10 Operations and Maintenance Manual
A copy of the Operations and Maintenance Manual, along with the Maintenance
Requirements for Flow Control, Conveyance, and WO Facilities is located in Appendix H.
11 References
City of Renton. (201 OJ. City of Renton Amendments to the King County Surface Water Design
Manual. Renton: City of Renton.
King County. (2009). Surface Water Design Manual. Seattle: King County .
November16,2016 I 17
This page intentionally left blank.
Appendix A
FEMA Firmette
This page intentionally left blank.
•
~-·-··-----------
!
' t'
~-'---1----+~"-+~~!--=·---j-~~"t-="---1-="--~-·~· l
~~--'--"'~I----~
~.~ 1
I I
' ' ·r~ q
htH r :;
Ill ;;
,.,,..~,,,.,..,,,.,,,,,"
"'"'""""",,,.,, • ....,,I
•mo """' l!W'>G>':
-~----.,-----___ -~-=-=---~---=-~ ----~-=----=--~-~-
M~ 11~ !5 !,!~~ 6:!! ,ji; I;, ,~ 8~o a ,a :r-;s ;:1: ,~ ~zo la !~ ~~; i:
! l z
~H ~
"t iii n' :~ I" I~ !
m ii
I
llJ
I
H
•
0 ,, ~
•0 r -~
0 z
~, .... ...,,,.,,, --· --·-·----------
I
;
,~,:
•
\ ' i
\1,-------_Ji
•
L. 'I 1 k'I ~ s ! ,;,I ~ X -
' 0
I 11 ,1 -,
'
Appendix B
Drainage System Table
2009 Surface Water Design Manual
KII\G COUNTY, WASHINGTON, SURFACE WATER DESIGN MAI\CAL
KING COUNTY, WASHINGTON
SURFACE WATER DESIGN MANUAL
REFERENCE 8-B
OFFSITE ANALYSIS
DRAINAGE SYSTEM TABLE
1/9/2009
Basin: Duwamish River
Symbol Drainage
Component Type,
Name, and Size
see map Type: sheet flow, swale,
stream, channel, pipe,
pond; Size: diameter,
surface area
Pink Fill
Blue Fill
Yellow Fill
OFF-SITE ANALYSIS DRAINAGE SYSTEM TABLE
SURFACE WATER DESIGN MANUAL, CORE REQUIREMENT #2
Subbasin Name: Project Area Subbasin Number: 1
Drainage Slope Distance Existing Potential Observations of field
Component from site Problems Problems inspector, resource
Descriotion discharae reviewer, or resident
drainage basin, vegetation, % 14 ml= 1,320 ft. constrictions, under capacity, ponding, tributary area, likelihood of problem,
cover, depth, type of sensitive overlapping, flooding, habitat or organism overflow pathways, potential impacts
area, volume destruction, scouring, bank sloughing,
sedimentation, incision, other erosion
Landslide Hazard Adjacent None documented Increased None observed
erosion and
Erosion Hazard Adjacent None documented bank failure risk None observed
Steep Slope Adjacent None documented None observed
11912009
Appendix C
Site Photographs
This page intentionally left blank.
Site Photos
January 18th, 2016
• Ponded water along eastern
edge of site.
• Ponded water along
northwestern edge of site.
1 • Elevated field located off of the
eastern edge of the substation,
looking south.
--~ -l • Elevated area along northern
edge of substation, looking west.
--·--
• Culvert outletting from south
end of substation into
• Local depression along southern
edge of substation (site of
proposed stormwater detention
pond).
• Local depression located along
substation discharge path off the
southwest corner of the
substation.
• Typical mountain bike path
through downstream drainage
area.
• 4" Culvert passing beneath
mountain bike path.
• Looking south towards Grant
Avenue South.
i
• Looking north towards
substation, along drainage path.
~ .,. .. /
This page intentionally left blank.
Appendix D
Reference 11-A Flow Control
Areas
Reference 11-A
SE 72nd St
Lake
Washington
'\
91-405FWY
(f)
Q)
> <{
.c
~
CX)
.c
a5
r SE 60th St
,
Pan t her
Lake
Newcastle Way
~ (
J~ ,v
.p~
Flow Control Standards
CJ Pe ak Rate Flow Contro l Standard (Existing Site Conditions)
~ Flow Contro l Du ration Standa rd (Ex isting Site Conditions )
Flow Control Du ration Standard (Forested Cond itions)
1111 Flood Problem Flow
CJ Unincorporated King County Flow Control Standa rds --··-... L,._.! Renton City Lim its -·-·, L._.J Potential Annexation Area
\ ~
\ w '1'19/)I, -----.J'
( ~ 0r; Issa quah ~)
<{
Lake
Youngs
\
\
\
Flow Control Application Map
Date: 01/09/2014
l
W~E ~ s
0 2 --===:..-====------• Miles
1
Appendix E
Stormwater Model Output
This page intentionally left blank.
KCRTS
Pre-developed and Developed Duration Comparison
Predeveloped and Developed Duration Comparison
Duration Comparison Analysis
Base File: psetalbotpredev 020816.tsf
New File: pserdout 020816.tsf
Fraction of Time Check of Tolerance
Cutoff Base New % Change Prob Base New % Change
(CFS)
0.081 0.0095 0.0067 -29.5 0.0095 0.081 0.078 -4.6
0.104 0.0063 0.0056 -10.4 0.0063 0.104 0.087 -16.0
0.126 0.0050 0.0053 5.9 0.0050 0.126 0.132 4.4
0.148 0.0037 0.0038 3.1 0.0037 0.148 0.151 1.9
0.171 0.0029 0.0025 -11.9 0.0029 0.171 0.165 -3.4
0.193 0.0022 0.0018 -19.9 0.0022 0.193 0.178 -7.8
0.215 0.0015 0.0011 -23.9 0.0015 0.215 0.202 -6.0
0.237 0.0010 0.0007 -31.7 0.0010 0.237 0.221 -7.0
0.26 0.0006 0.0005 -15.8 0.0006 0.260 0.250 -3.8
0.282 0.0003 0.0004 4.8 0.0003 0.282 0.285 1.2
0.304 0.0002 0.0003 14.3 0.0002 0.304 0.316 3.9
0.326 0.0002 0.0002 20.0 0.0002 0.326 0.337 3.2
0.349 0.0001 0.0001 -28.6 0.0001 0.349 0.348 -0.2
0.371 0.0000 0.0000 -100.0 0.0000 0.371 0.363 -2.3
Maximum positive excursion = 0.008 cfs (6.7%) occurring at 0.120 els on the Base Data
(psetalbotpredev_020816.tsf) and at 0.128 els on the New Data (pserdout_020816.tsl).
Maximum negative excursion= 0.019 els (-19.0%) occurring at 0.099 els on the Base Data
(psetalbotpredev_020816.tsf) and at 0.080 els on the New Data (pserdout_020816.tsf).
KCRTS
Pond Design Results
KCRTS Retention/Detention Facility Summary
Relention/Dete~tion Facil~ty
Type of Facility: Detention Pond
Side Slope: 2.00 H: lV
Pond Bottom Length: 241.81 ft
Pond Bottom Width: 27.00 ft
Pond Bottom Area: 6529. sq. ft
Top Area at 1 ft. FE: 16155. sq. ft
0 .371 acres
Effective Storage Depth: 7.00 ft
Stage O Elevation: 425.50 ft
Storage Volume: 73876. cu. ft
1. 696 ac-ft
Riser Head: 7.00 ft
Riser Diameter: 12.00 inches
Number of orifices: 3
Full Head Pipe
Orifice # Height Diameter Discharge Diameter
(ft) (in) (CFS) (in)
1 0.00 1.15 0.095
2 4.85 2 .13 0.180 6.0
3 6.10 2.00 0.103 4. 0
Top Notch Weir: None
Outflow Rating Curve: None
Stage Elevation Storage Discharge Percolation Surf
Area
(ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs) (sq.
ft)
0.00 425.50 0. 0.000 0.000 0.00
6529.
0.01 425.51 65. 0.001 0.004 0.00
6540.
0.02 425.52 131. 0.003 0. 0 06 0.00
6551.
0.04 425.54 262. 0.006 0.007 0.00
6572.
0.05 425.55 328. 0.008 0.008 0.00
6583.
0.06 425.56 394. 0.009 0.009 0.00
6594.
0.07 425.57 460. 0. 011 0.010 0.00
6604.
0.08 425.58 526. 0.012 C.010 0.00
6615.
0.10 425.60 658. 0.015 0. 011 0.00
6637.
0.23 425.73 1530. 0.035 0.017 0.00
6 777.
0.37 425.87 2490. 0.057 0.022 0.00
6929.
0.:) ~ 426.01 3470. 0.080 0.026 0.00
7082.
0.64 426.14 4400. 0.101 0.029 0.00
722,.
0.78 426.28 542?. 0 .124 0.032 0.00
7377.
0.92 426.42 6466. 0.148 0.034 0.00
7532.
1. 06 426.56 7531. 0 .173 0. 037 0.00
76 8 7.
1.19 426.69 8540. 0 .196 0.039 0.00
7831.
1. 33 426.83 964 7. 0.221 0.041 0.00
7987.
1. 4 7 426.97 10776. 0.247 0 .043 0.00
8144.
1. 61 427.11 11928. 0.274 0.045 0.00
8302.
1. 74 427.24 13016. 0.299 0.047 0.00
8448.
1. 88 427.38 14210. 0.326 0.049 0.00
8607.
2.02 427.52 15426. 0.354 0.051 0.00
8766.
2.15 427.65 16576. 0.381 0.053 0.00
8915.
2.29 427.79 17835. 0.409 0.054 0.00
9075.
2.43 427.93 19117. 0.439 0.056 0.00
9236.
2.57 428.07 20 421. C.469 0.057 0.00
9398.
2.70 428.20 21653. 0. 49 7 0.059 0.00
9549.
2.84 428.34 23001. 0.528 0.060 0.00
9712.
2.98 428.48 24372. 0.560 0.062 0.00
9875.
3.12 428.62 25766. 0. 592 0.063 0.00
10040.
3.25 428.75 27081. 0.622 0.065 0.00
10193.
3.39 '28.89 28520. 0.655 0.066 0.00
10358.
3.53 429.03 29981. 0.688 0.067 0.00
10524.
3.66 429.16 31359. 0.720 0.069 0.00
10679.
3.80 429.30 32866. 0.755 0.070 0.00
10846.
3.94 429.44 34396. 0.790 0 .071 0.00
11014.
4.08 429.58 35950. 0.825 0 .072 0.00
11182.
4 .21 429.71 37414. 0.859 0.074 0.00
11339.
4.35 429.85 39013. 0. 896 0.075 0.00
11509.
4.49 429.99 40637. 0.933 0.076 0.00
11679.
4.63 430 .13 42284. 0. 971 0.077 0.00
11850.
4.76 430.26 43835. 1.006 0. 078 0.00
12010.
4.85 430.35 44920. l. 031 0.079 0.00
12120.
4.87 430.37 45163. 1. 037 0.080 0.00
12145.
4.89 430.39 45406. 1.042 0.084 0.00
12170.
4.92 430.42 45772. 1.051 0.090 0.00
12207.
4.94 430.44 46016. 1.056 0.098 0.00
12231.
4. 96 430.46 46261. 1.062 0.108 0.00
12256.
4.98 430.48 46507. 1. 06 8 0.120 0.00
12281.
5.00 430.50 46752. 1.073 0.128 0.00
12305.
5.03 430.53 4 7122. 1. 0 82 0.132 0.00
12342.
5. 05 430.55 47369. 1.087 0.135 0.00
12367.
5.19 430.69 49113. 1.127 0.153 0.00
12541.
5.32 430.82 50754. 1.165 0.167 0.00
12702.
5.46 430. 96 52544. 1. 206 0.180 0.00
12877.
5.60 431.10 54359. 1. 248 0.191 0.00
13052.
5.74 431. 24 56199. 1. 290 0.201 0.00
13228.
5.87 431.37 57929. 1. 330 0. 211 0.00
13392.
6.01 431.51 59816. 1. 373 0.220 0.00
13569.
6.10 431.60 61043. 1.401 0.226 0.00
13683.
6.12 431. 62 6131 7. 1.408 0.228 0.00
13709.
6.14 431. 6 4 61591. 1. 414 0.231 0.00
13734.
6.16 431.66 61866. 1. 420 0.237 0.00
13760.
6.18 431.68 62141. 1.427 0.244 0.00
13785.
6.20 431.70 62417. 1.433 0.252 0.00
13811.
6.23 431.73 62832. 1.442 0.262 0.00
13849.
6.25 431.75 63109. 1.449 0. 272 0.00
13874.
6.27 431. 77 63387. 1.455 0.280 o.oc
13900.
6.40 431. 90 65205. 1.497 0.303 0.00
14066.
6.54 432.04 67187. 1. 542 0.323 0.00
14246.
6.68 432.18 69194. 1. 588 0.341 0.00
14426.
6.82 432.32 71226. 1. 635 0.357 0.00
14606.
6.95 432.45 73136. 1. 6 79 0. 372 0.00
14 775.
7.00 432.50 73876. 1. 696 0.377 0.00
14840.
7.10 432.60 75367. 1. 730 0. 696 0.00
14970.
7.20 432.70 76870. 1.765 1. 270 0.00
15100.
7.30 432.80 78387. 1. 800 2.010 0.00
15231.
7.40 432.90 79916. 1. 835 2.810 0.00
15362.
7.50 433.00 81459. 1.870 3.100 0.00
15493.
7.60 433.10 83015. 1. 906 3.360 0.00
15625.
7.70 433.20 84584. 1.942 3.610 0.00
15757.
7.80 433.30 86167. 1. 978 3.830 0.00
15889.
7.90 433.40 87762. 2.015 4.050 0.00
16022.
8.00 433.50 89371. 2.052 4.250 0.00
16155.
8.10 433.60 90993. 2.089 4.440 0.00
16288.
8.20 433.70 92629. 2.126 4.630 0.00
16422.
8.30 433.80 94278. 2.164 4.800 0.00
16556.
8.40 433.90 95940. 2.202 4.970 0.00
16690.
8.50 434.00 97616. 2.241 5.140 0.00
16825.
8.60 434 .10 99305. 2.280 5.300 0.00
16960.
8.70 434.20 101008. 2.319 5.450 0.00
17095.
8.80 43C 30 102724. 2.358 5.600 8.0C
17230.
8.90 434.40 10445s. 2.398 5.750 0.00
17366.
Hyd Inflow Outflow Peak Sto::age
Target Cale Stage Elev (Cu-Ft)
1 2.25 0.47 1. 05 7.16 432.66 76281.
2 1.11 ******* 0.36 6.80 432.30 71008.
3 1.12 ******* 0.26 6.23 431.73 62802.
4 1.18 ******* 0 .17 5.37 430.87 51439.
5 l. 34 ******* 0.28 6 .27 431.77 63431.
6 0.70 ******* 0.09 4. 92 430.42 45833.
7 0. 91 ******* 0.08 4.57 430.07 41528.
8 0.99 ******* 0.07 3.37 428.87 28288.
----------------------------------
Route Time Series through Facility
Inflow Time Series File:psetalbotdev_020816.tsf
Outfiow Time Series File:PSErdout 020816
Inflow/Outflow Analysis
Peak Inflow Discharge: 2.25 CFS at 6:00 on
Peak Outflow Discharge: 1. 04 CFS at 10:00 on
Peak Reservoir Stage: 7.16 Ft
Peak Reservoir Elev: 432.66 Ft
Peak Reservoir Storage: 76281. Cu-Ft
1.751 Ac-Ft
(Ac-Ft)
l. 751
:.630
1.442
1.181
1.456
1.052
0.953
0.649
Jan 9 in
Jan 9 in
Year 8
Year 8
KCRTS
Pre-developed and Developed Stormwater Pond Flow
Output
Predeveloped Peak Flows and Flow Frequency Analysis from KCRTS
Flow Frequency Analysis
Time Series File: psetalbotpredev 020816.tsf
Project Location:Sea-Tac
I ' I
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak --Peaks--Rank Return Prob
(CFS) (CFS) Period
0.372 2 2/9/200118:00 0.475 1 100 0.99
0.101 7 1/6/2002 3:00 0.372 2 25 0.96
0.276 4 2/28/2003 3:00 0.285 3 10 0.9
0.010 8 3/24/2004 20:00 0.276 4 5 0.8
0.164 6 1/5/2005 8:00 0.241 5 3 0.667
0.285 3 1/18/2006 21:00 0.164 6 2 0.5
0.241 5 11/24/2006 4:00 0.101 7 1.3 0.231
0.475 1 1/9/2008 9:00 0.010 8 1.1 0.091
Computed
Peaks 0.441 50 0.98
Developed Peak Flows and Flow Frequency Analysis before Stormwater
Detention Pond from KCRTS
Flow Frequency Analysis
Time Series File: psetalbotdev 020816.tsf
Project Location:Sea-Tac
I I I
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak --Peaks--Rank Return Prob
(CFS) (CFS) Period
1.11 6 2/9/2001 2:00 2.25 1 100 0.99
0.912 8 1/5/2002 16:00 1.44 2 25 0.96
1.34 3 2/27 /03 7:00 1.34 3 10 0.9
0.992 7 8/26/2004 2:00 1.20 4 5 0.8
1.20 4 10/28/2004 16:00 1.18 5 3 0.667
1.18 5 1/18/2006 16:00 1.11 6 2 0.5
1.44 2 10/26/2006 0:00 0.992 7 1.3 0.231
2.25 1 1/9/2008 6:00 0.912 8 1.1 0.091
Computed
Peaks 1.98 50 0.98
Proposed Peak Flows and Flow Frequency Analysis from Stormwater
Detention Pond from KCRTS
Flow Frequency Analysis
Time Series File:pserdout 020816.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--------Flow Frequency Analysis-------
Flow Rate Rank Time of Peak --Peaks--Rank Return Prob
(CFS) (CFS) (ft) Period
0.363 2 2/9/2001 21:00 1.04 7.16 1 100 0.99
0.077 7 1/7/2002 4:00 0.363 6.87 2 25 0.96
0.281 3 3/6/2003 22:00 0.281 6.27 3 10 0.9
0.066 8 8/26/2004 7:00 0.261 6.23 4 5 0.8
0.092 6 1/8/2005 5:00 0.172 5.37 5 3 0.667
0.172 5 1/19/2006 0:00 0.092 4.92 6 2 0.5
0.261 4 11/24/2006 8:00 0.077 4.57 7 1.3 0.231
1.04 1 1/9/2008 10:00 0.066 3.37 8 1.1 0.091
Computed
Peaks 0.818 7.12 50 0.98
This page intentionally left blank.
KCRTS
Pre-developed and Developed Flow Durations and Curve
Predeveloped Flow Durations from KCRTS
Flow Duration
Time Series File: psetalbotpredev 020816.tsf
Exceed a nee
Cutoff Count Frequency CDF Probability
CFS % % %
0.082 60744 99.061 99.061 0.939 9.39E-03
0.092 112 0.183 99.243 0.757 7.57E-03
0.103 72 0.117 99.361 0.639 6.39E-03
0.113 41 0.067 99.428 0.572 5.72E-03
0.123 40 0.065 99.493 0.507 5.07E-03
0.134 35 0.057 99.550 0.450 4.SOE-03
0.144 37 0.060 99.610 0.390 3.90E-03
0.154 27 0.044 99.654 0.346 3.46E-03
0.164 23 0.038 99.692 0.308 3.08E-03
0.175 22 0.036 99.728 0.272 2.72E-03
0.185 18 0.029 99.757 0.243 2.43E-03
0.195 17 0.028 99.785 0.215 2.lSE-03
0.206 23 0.038 99.822 0.178 1.78E-03
0.216 19 0.031 99.853 0.147 1.47E-03
0.226 12 0.020 99.873 0.127 1.27E-03
0.236 15 0.024 99.897 0.103 1.03E-03
0.247 13 0.021 99.918 0.082 8.15E-04
0.257 9 0.015 99.933 0.067 6.69E-04
0.267 9 0.015 99.948 0.052 5.22E-04
0.278 9 0.015 99.962 0.038 3.75E-04
0.288 5 0.008 99.971 0.029 2.94E-04
0.298 2 0.003 99.974 0.026 2.61E-04
0.309 3 0.005 99.979 0.021 2.12E-04
0.319 2 0.003 99.982 0.018 1.79E-04
0.329 1 0.002 99.984 0.016 1.63E-04
0.340 1 0.002 99.985 0.015 1.47E-04
0.350 4 0.007 99.992 0.008 8.15E-05
0.360 3 0.005 99.997 0.003 3.26E-05
0.370 1 0.002 99.998 0.002 1.63E-05
0.381 1 0.002 100.000 0.000 O.OOE+OO
0.391 0 0.000 100.000 0.000 O.OOE+OO
0.401 0 0.000 100.000 0.000 O.OOE+OO
0.412 0 0.000 100.000 0.000 O.OOE+OO
0.422 0 0.000 100.000 0.000 O.OOE+OO
0.432 0 0.000 100.000 0.000 O.OOE+OO
0.443 0 0.000 100.000 0.000 0.00E+OO
0.432 0 0.000 100.000 0.000 0.00E+OO
0.443 0 0.000 100.000 0.000 O.OOE+OO
Developed Flow Durations from Stormwater Detention Pond from KCRTS
Flow Duration
Time Series File: psetalbotpredev 020816.tsf
Exceed a nee
Cutoff Count Frequency CDF Probability
CFS % % %
0.005 30750 50.147 50.147 49.853 4.99E-01
0.015 6754 11.014 61.161 38.839 3.88E-01
0.026 5291 8.629 69.790 30.210 3.02E-01
0.036 5511 8.987 78.777 21.223 2.12E-01
0.046 4878 7.955 86.732 13.268 1.33E-01
0.056 3407 5.556 92.288 7.712 7.71E-02
0.066 2133 3.478 95.766 4.234 4.23E-02
0.077 1820 2.968 98.735 1.265 1.27E-02
0.087 390 0.636 99.371 0.629 6.29E-03
0.097 33 0.054 99.424 0.576 5.76E-03
0.107 11 0.018 99.442 0.558 5.58E-03
0.117 10 0.016 99.459 0.541 5.41E-03
0.128 10 0.016 99.475 0.525 5.25E-03
0.138 43 0.070 99.545 0.455 4.55E-03
0.148 43 0.070 99.615 0.385 3.85E-03
0.158 41 0.067 99.682 0.318 3.18E-03
0.168 31 0.051 99.733 0.267 2.67E-03
0.178 29 0.047 99.780 0.220 2.20E-03
0.189 20 0.033 99.812 0.188 1.88E-03
0.199 15 0.024 99.837 0.163 l.63E-03
0.209 21 0.034 99.871 0.129 l.29E-03
0.219 16 0.026 99.897 0.103 1.03E-03
0.229 15 0.024 99.922 0.078 7.83E-04
0.24 6 0.010 99.932 0.068 6.85E-04
0.25 4 0.007 99.938 0.062 6.20E-04
0.26 6 0.010 99.948 0.052 5.22E-04
0.27 4 0.007 99.954 0.046 4.57E-04
0.28 4 0.007 99.961 0.039 3.91E-04
0.291 6 0.010 99.971 0.029 2.94E-04
0.301 1 0.002 99.972 0.028 2.77E-04
0.311 2 0.003 99.976 0.024 2.45E-04
0.321 2 0.003 99.979 0.021 2.12E-04
0.331 3 0.005 99.984 0.016 l.63E-04
0.342 2 0.003 99.987 0.013 1.30E-04
0.352 3 0.005 99.992 0.008 8.15E-05
0.362 4 0.007 99.998 0.002 l.63E-05
This page intentionally left blank.
;;j'
~
~
"' ~
" .c u
5
0.4
0.35
0.3
0.25
I
0.2
I
0.15
0.1
0.05
0
l.OOE-05 l.OOE-04
Flow Duration Analysis from KCRTS
~ --Developed
Conditions
' --Predeveloped
Conditions
l.OOE-03 l.OOE-02 l.OOE-01 l.OOE+OO
Probability Exceedence
This page intentionally left blank.
Rational Method Documentation
Rational Method
Rational Method Pipe Capacity Analysis
25-yr Flows (ds) 25-yr Capacity Analysis 100-yr Flows (cfs)
Runoff from from Total Cumulative Pipe Full Flow Compliant Runoff from Runoff from Total Cumulative
Subbasin 1mpervious Impervious Pervious Runoff Flow in Downstream Capacity from with Capacity Impervious Pervious Area Runoff Flow in
Name Area (ft2
) Area (ac) Area(%) Area (cfs) Area (cfs) (cfs) System (cfs) Pipe Name XPSWMM(ds) Requirement? Area (cfs) (cfs) (cfs) System ( cfs)
CB10 1783.8 0.041 0.65 0.020 0.010 0.030 0.030 Link4 0.940 Yes 0.021 0.012 0.034 0.034
CB11 2272.8 0.052 0.65 0.025 0.013 0.038 0.068 Link5 0.940 Yes 0.029 oms 0.044 0.078
CB12 2504.3 0.057 0.65 0.028 0.014 0.042 0.110 Link6 0.940 Yes 0.032 0.016 0.048 0.126
CB13 2.124.6 0.053 0.65 0.026 0.013 0.039 0.149 Link7 0.940 Yes 0.030 0.015 0.045 0.170
Ci:H4 2243.2 0.051 0.65 0.025 0.013 0.038 0.186 Link8 0.940 Yes 0.029 0.015 0.043 0.213
CB15 2279.5 0.052 0.65 0.025 0.013 0.038 0.284 Link9 0.940 Yes 0.029 0.015 0.044 0.326
CB16 2101.l 0.048 0.65 0.023 0.012 0.035 0.319 LinklO 0.940 Yes 0.027 0.014 0.040 0.366
CtH7 2260.6 0.052 0.65 0.025 0.013 0.038 0.357 Link11 0.950 Yes 0.029 0.015 0.043 0.409
CB18 2388.4 0.055 0.65 0.026 0.013 0.040 0.397 Link12 0.940 Yes 0.030 0.015 0.046 0.455
C:B19 2%9.6 0.054 0.65 0.026 0.013 0.040 0.437 Link.13 0.910 Yes 0.030 0.015 0.045 0.501
CB20 2541.3 0.058 0.65 0.028 0.014 0.042 0.479 Link14 2.730 Yes 0.032 0.016 0.049 0.549
CB21 1809.5 0.042 0.65 0.020 0.010 0.030 0.509 Link15 2.710 Yes 0.021 0.012 0.035 0.584
C:B22 4239.4 0.097 0.65 0.047 0.024 0.071 0.071 Link19 0.940 Yes 0.054 0.027 0.081 0.081
CB23 7207 0.165 0.65 0.080 0.041 0.120 0.191 Link20 0.940 Yes 0.092 0.047 0.138 0.220
CB24 514.1.6 0.118 0.65 0.057 0.029 0.086 0.277 Link21 1.100 Yes 0.065 0.033 0.099 0.318
CU25 3582.3 0.082 0.65 0.040 0.020 0.060 0.337 Link22 0.950 Yes 0.046 0.023 0.069 0.387
CB26 5034.8 0.116 0.65 O.OS6 0.028 0.084 0.084 Link16 0.940 Yes 0.064 0.033 0.097 0.097
CB27 7103.4 0.163 0.65 0.079 0.040 0.119 0.203 Link17 0.940 Yes 0.090 0.046 0.136 0.233
Cl:328 4914.9 0.113 0.65 0.054 0.028 0.082 0.285 Link18 2.730 Yes 0.062 0.032 0.094 0.327
CB29 2539.3 0.058 0.65 0.028 0.014 0.042 2.571 Link54 2.730 Yes 0.032 0.016 0.049 2.950
CB30 4221.2 0.097 0.65 0.047 0.024 0.071 0.071 Link23 0.940 Yes 0.054 0.027 0.081 0.081
CB31 7300.1 0.168 0.65 0.081 0.041 0.122 0.193 Link.24 0.940 Yes 0.093 0.047 0.140 0.221
CB32 5210.8 0.120 0.65 0.058 0.029 0.087 0.280 Link25 0.940 Yes 0.066 0.034 0.100 0.3?1
CB33 3677.3 0.084 0.65 0.041 0.021 0.061 0.341 Link26 0.940 Yes 0.047 0.024 0.071 0.391
CB34 5122.1 0.118 0.65 0.057 0.029 0.086 0.086 Link.27 0.940 Yes 0.065 0.033 0.098 0.098
CB35 7241.6 0.166 0.65 0.080 0.041 0.121 0.207 Link28 0.940 Yes 0.092 0.047 0.139 0.237
Cl:336 5030.2 0.115 0.65 0.056 0.028 0.084 0.291 Link.29 2.730 Yes 0.064 0.033 0.096 0.334
CB37 2586.9 0.059 0.65 0.029 O.D15 0.043 1.735 Link30 2.730 Yes 0.033 0.Q17 0.050 1.990
CB38 5877.5 0.135 0.65 0.065 0.033 0.098 0.098 Link31 0.940 Yes O.D75 0.038 0.113 0.113
CB39 4688.8 0.108 0.65 0.052 0.026 0.078 0.232 Link32 0.940 Yes 0.060 0.030 0.090 0.266
CB40 3307.2 0.076 0.65 0.037 0.019 0.055 0.055 Link44 0.940 Yes 0.042 0.021 0.063 0.063
CB41 5186.1 0.119 0.65 0.057 0.029 0.087 0.319 Link33 0.940 Yes 0.066 0.034 0.099 0.365
CB42 3599.2 0.083 0.65 0.040 0.020 0.060 0.060 Link43 0.940 Yes 0.046 0.023 0.069 0.069
CB43 4345.9 0.100 0.65 0.048 0.024 0.073 0.864 Link34 2.110 Yes 0.055 0.028 0.083 0.992
CB44 3895 0.089 0.65 0.043 0.022 0.065 0.971 Link35 2.750 Yes 0.050 0.025 0.075 1.114
CB45 3795 0.087 0.65 0.042 0.021 0.063 1.210 Link37 2.730 Yes 0.048 0.025 0.073 1.388
CB46 2829 0.065 0.65 0.031 0.016 0.047 0.075 Link.41 0.940 Yes 0.036 0.018 0.054 0.086
CB47 1648.9 0.038 1 0.028 0.000 0.028 0.028 Link45 0.950 Yes 0.032 0.000 0.032 0.032
CB48 4692.4 0.108 0.65 0.052 0.026 0.078 1.336 Link38 2.730 Yes 0.060 0.030 0.090 1.533
CB49 2852.1 0.065 0.65 0.032 0.016 0.048 0.048 Link40 0.940 Yes 0.036 0.018 0.055 0.055
CB50 3854.1 0.088 0.65 0.043 0.022 0.064 1.401 Link39 2.730 Yes 0.049 0.025 0.074 1.607
CB51 2488.9 0.057 0.65 0.028 0.014 0.042 0.042 Link53 0.470 Yes 0.032 0.016 0.048 0.048
CB52 1505.1 0.035 0.65 0.017 0.008 0.025 0.025 Link48 0.470 Yes 0.019 0.010 0.029 0.029
CB53 1460.6 0.034 0.65 0.016 0.008 0.024 0.050 Link49 0.470 Yes 0.019 0.009 0.028 0.057
CS54 2481.8 0.057 0.65 O.D28 0.014 0.041 0.041 Link.52 0.470 Yes 0.032 0.016 0.048 0.048
CBSS 1492.6 0.034 0.65 0.017 0.008 0.025 0.050 Link51 0.470 Yes 0.019 0.010 0.029 0.057
CB56 1489.5 0.034 0.65 0.017 0.008 0.025 0.025 LinkSO 0.520 Yes O.D19 0.010 0.029 0.029
CB57 3437.5 0.079 0.65 O.D38 0.019 0.057 1.071 Unk36 2.730 Yes 0.044 0.022 0.066 1.229
C:B58 2562.5 0.059 0.65 0.028 0.014 0.043 0.043 Link42 0.940 Yes 0.033 0.Q17 0.049 0.049
GI-1 2475.2 0.057 0.65 0.027 0.014 0.041 0.133 Link47 1.030 Yes 0.031 0.016 0.047 0.152
GI-2 2440.2 0.056 0.65 0.027 0.014 0.041 0.132 Link46 1.030 Yes 0.031 0.016 0.047 0.151
Rational Method Coefficient
0.85 for gravel pavement
0.9 for pavement
Rainfall Intensity (ft/s)
0.00002 for 25-yr
0.00002 for 100-yr
This page intentionally left blank.
XPSWMM Model Documentation
XPSWMM
XPSWMM Model Schematic
CB10 CB11 CB12 CB13 CB14 CB15 CB16 CB17 CB18 CB19 CB20 CB21
Lin~ Linlf15
CB22 CB23 CB24 f.;B25 CB26 CB27 CB28 tCB29 Pond OF
-~
CB30 CB31 CB32 CB33 CB34 CB35 CB36
unto
CB37
CB38 CB39 CB.41 CB48
unlo CB49
~ CB46, 1_"
CB58
CB51 CB54
CB56
CB53
XPSWMM
Catch Basin (Node) & Pipe (Link) Input Data
link Input Data Summary
Downstream
Upstream Downstream Upstream Invert Invert Diameter Length Conduit
link Name Node Name Node Name Elevation (ft) Elevation (ft) (ft) (ft) Slope (%) Roughness
Link4 (810 (811 436.51 436.26 0.67 so 0.5 0.012
Links C811 CB12 436.26 435.96 0.67 60 0.5 0.012
Link6 CB12 CB13 435.96 435.66 0.67 60 0.5 0.012
Link7 CB13 CB14 435.66 435.41 0.67 50 0.5 0.012
Link8 C814 CB1S 435.24 434.92 0.67 64 0.5 0.012
Link9 CB15 CB16 434.S 434.27 0.67 46 0.5 0.012
Link10 CB16 CB17 434.27 434.02 0.67 so o.s 0.012
Link11 (817 CB18 434.02 433.73 0.67 57 0.5 0.012
Link12 CB18 CB19 433.73 433.48 0.67 50 0.5 0.012
Link13 CB19 C820 433.48 433.21 0.67 58 0.5 0.012
Link14 C820 C821 432.88 432.58 1 60 0.5 0.012
Link15 C821 C829 432.58 432.26 1 65 0.5 0.012
link54 C829 Pond 430.69 430.5 1 38 0.5 0.012
link18 C828 C829 435.13 434.83 1 60 0.5 0.012
Link17 C827 (828 435.77 435.23 0.67 108 0.5 0.012
Link16 C826 (827 436.42 435.87 0.67 110 0.5 0.012
Link22 CB25 CB15 434.94 434.6 0.67 67 0.5 0.012
Link21 C824 CB25 435.34 434.97 0.67 54 0.5 0.012
Unk20 (823 CB24 435.96 435.41 0.67 110 0.5 0.012
Link19 (822 CB23 436.51 435.96 0.67 110 0.5 0.012
Link30 CB37 (829 430.98 430.69 1 58 0.5 0.012
Link28 C835 (836 435.88 435.34 0.67 108 0.5 0.012
Link29 CB36 (837 435.01 434.71 1 60 0.5 0.012
Link27 CB34 CB35 436.42 435.88 0.67 108 0.5 0.012
Link39 CBSO CB37 431.36 430.98 1 76 0.5 0.012
Link38 CB48 CB50 431.66 431.36 1 60 0.5 0.012
Link37 CB45 CB48 432.53 431.99 1 108 0.5 0.012
Link36 CB57 CB45 434.11 433.81 1 60 0.5 0.012
Link35 CB44 CB57 434.44 434.11 1 65 0.5 0.012
Link34 CB43 CB44 434.54 434.45 1 17 0.5 0.012
Link33 CB41 CB43 435.49 435.12 0.67 74 0.5 0.012
Link32 CB39 C841 436.21 435.66 0.67 110 0.5 0.012
Link31 CB38 C839 436.51 436.21 0.67 60 0.5 0.012
Link26 C833 CB43 434.92 434.54 0.67 76 0.5 0.012
Link25 CB32 CB33 435.24 434.92 0.67 64 0,5 0.012
Link24 CB31 (832 435.96 435.41 0.67 110 0.5 0.012
Link23 C830 CB31 436.51 435.96 0.67 110 0.5 0.012
Link44 CB40 C839 436.45 436.25 0.67 40 0.5 0.012
Link43 CB42 (841 436.25 436.05 0.67 40 0.5 0.012
Link42 CBS8 (857 436 435.8 0.67 40 0.5 0.012
link40 CB49 (848 436 435.8 0.67 40 0.5 0.012
Link41 CB46 (845 432.75 432.6 0.67 30 0.5 0.012
Link45 CB47 (846 432.98 432.75 0.67 45 0.5 0.012
Link46 Gl-2 (843 435.21 434.79 0.67 83 0.5 0.011
Link47 Gl-1 (844 435.21 434.79 0.67 83 0.5 0.011
Link51 C855 Gl-1 435.93 435.71 0.5 43 0.5 0.011
LinkSO (856 CBSS 436.45 435.93 0.5 83 0.5 0.011
Link52 (854 Gl-1 436.25 435.84 0.5 83 0.5 0.011
Link49 C853 Gl-2 435.93 435.71 0.5 43 0.5 0.011
Link48 (852 CB53 436.45 436.03 0.5 83 0.5 0.011
Link53 C851 Gl-2 436.25 435.84 o.s 83 0.5 0.011
(link 55) riserweir Pond OF NA NA NA NA NA NA
(Link 55) bottom orifice Pond OF NA NA 0.10 NA NA NA
(Link 55) side#1 Pond OF NA NA 0.18 NA NA NA
{Link 55) side#2 Pond OF NA NA 0.17 NA NA NA
Node Hydraulic Input Data
Invert
Node Ground Elevation Elevation
Name Spill Crest (ft) (ft)
CB10 437.92 436.51
CB11 437.92 436.26
CB12 437.92 435.96
CB13 437.92 435.66
CB14 437.92 435.24
CB15 437.92 434.5
CB16 437.92 434.27
CB17 437.92 434.02
CB18 437.92 433.73
CB19 437.92 433.48
CB20 437.92 432.88
CB21 437.92 432.58
CB29 437.92 430.69
CB28 437.75 435.13
CB27 437.75 435.77
CB26 437.75 436.42
CB25 437.75 434.94
CB24 437.75 435.24
CB23 437.75 435.96
CB22 437.75 436.51
CB37 437.92 430.98
CB35 437.75 435.88
CB36 437.75 435.01
CB34 437.75 436.42
CB50 437.92 431.36
CB48 437.75 431.66
CB45 437.75 432.53
CB57 437.75 434.11
CB44 437.75 434.44
CB43 437.75 434.54
CB41 437.75 435.49
CB39 437.75 436.21
CB38 437.75 436.51
CB33 437.75 434.92
CB32 437.75 435.24
CB31 437.75 435.96
CB30 437.75 436.51
CB40 437.54 436.45
CB42 437.5 436.25
CB58 437.5 436
CB49 437.75 436
CB46 437.75 432.75
CB47 437.75 432.98
Gl-2 439.65 435.21
Gl-1 439.65 435.21
CB55 438.25 435.93
CB56 438.25 436.45
CB54 438.25 436.25
CB53 438.25 435.93
CB52 438.25 436.45
CB51 438.25 436.25
Pond 437.5 425.5
OF 437.5 425
Node Runoff Input Data
Node Area Slope Impervious
Name (ac) (ft/ft) Percentage(%) Width (ft)
(810 0.041 0.003 65 43
CBll 0.052 0.003 65 55
CB12 0.057 0.003 65 60
CB13 0.053 0.003 65 55
(814 0.051 0.003 65 57
(815 0.052 0.003 65 54
CB16 0.048 0.003 65 49
CB17 0.052 0.003 65 52
CB18 0.055 0.003 65 55
(819 0.054 0.003 65 54
C820 0.058 0.003 65 58
C821 0.042 0.003 65 44
CB29 0.058 0.003 65 63
CB28 0.113 0.003 65 79
C827 0.163 0.003 65 113
CB26 0.116 0.003 65 80
CB25 0.082 0.003 65 63
C824 0.118 0.003 65 82
CB23 0.165 0.003 65 114
C822 0.097 0.003 65 67
CB37 0.059 0.003 67 64
C835 0.166 0.003 65 114
CB36 0.115 0.003 65 79
C834 0.118 0.003 65 80
CBSO 0.088 0.003 65 95
C848 0.108 0.003 65 79
CB45 0.087 0.003 65 69
C857 0.079 0.003 65 62.5
C844 0.089 0.003 65 95
(843 0.1 0.003 65 95
CB41 0.119 0.003 65 92
CB39 0.108 0.003 65 84
CB38 0.135 0.003 65 46
CB33 0.084 0.003 65 64
(832 0.12 0.003 65 82
CB31 0.168 0.003 65 114
CB30 0.097 0.003 65 67
CB40 0.076 0.003 65 84
CB42 0.083 0.003 65 93
C858 0.059 0.003 65 62.5
CB49 0.065 0.003 65 80
(846 0.065 0.003 65 69
CB47 O.Q38 0.003 65 41
Gl-2 0.056 0.003 65 50
Gl-1 0.057 0.003 65 50
C855 0.034 0.003 65 50
CB56 0.034 0.003 65 50
(854 0.057 0.003 65 50
CB53 O.Q35 0.003 65 49
(852 0.035 0.003 65 40
CBS! 0.057 0.003 65 so
Pond NA NA NA NA
OF NA NA NA NA
XPSWMM
Catch Basin (Node) & Pipe (Link) Output Summary
Node Output Data Summary for 25-year Event
Duration of
Ma)( Water Max Water Depth Surcharge Duration of
Node Name Elevation (ft} (ft] Freeboard (ft) (min] Flooding (min)
CBlO 436.590 0.080 1.33 0.0 0.0
CBll 436.379 0.119 1.54 0.0 0.0
CB12 436.110 0.150 1.81 0.0 0.0
CB13 435.837 0.177 2.08 0.0 0.0
CB14 435.438 0.198 2.48 0.0 0.0
CB15 434.864 0.364 3.06 0.0 0.0
CB16 434.648 0.378 3.27 0.0 0.0
CB17 434.411 0.391 3.51 0.0 0.0
CB18 434.141 0.411 3.78 0.0 0.0
CB19 433.911 0.431 4.01 0.0 0.0
CB20 433.230 0.350 4.69 0.0 0.0
CB21 432.938 0.358 4.98 0.0 0.0
CB29 431.476 0.786 6.44 0.0 0.0
CB28 435.343 0.213 2.41 0.0 0.0
CB27 435.978 0.208 1.77 0.0 0.0
CB26 436.554 0.134 1.20 0.0 0.0
CB25 435.210 0.270 2.54 0.0 0.0
CB24 435.563 0.323 2.19 0.0 0.0
CB23 436.162 0.202 1.59 0.0 0.0
CB22 436.631 0.121 1.12 0.0 0.0
CB37 431.639 0.659 6.28 0.0 0.0
CB35 436.090 0.210 1.66 0.0 0.0
CB36 435.225 0.215 2.53 0.0 0.0
CB34 436.554 0.134 1.20 0.0 0.0
CB50 431.908 0.548 6.01 0.0 0.0
CB48 432.178 0.518 5.57 0.0 0.0
CB45 433.015 0.485 4.73 0.0 0.0
CB57 434.566 0.456 3.18 0.0 0.0
CB44 434.875 0.435 2.87 0.0 0.0
CB43 434.982 0.442 2.77 0.0 0.0
CB41 435.780 0.290 1.97 0.0 0.0
CB39 436.433 0.223 1.32 0.0 0.0
CB38 436.652 0.142 1.10 0.0 0.0
CB33 435.203 0.283 2.55 0.0 0.0
CB32 435.485 0.245 2.26 0.0 0.0
CB31 436.163 0.203 1.59 0.0 0.0
CB30 436.631 0.121 1.12 0.0 0.0
CB40 436.558 0.108 0.98 0.0 0.0
CB42 436.364 0.114 1.14 0.0 0.0
CB58 436.097 0.097 1.40 0.0 0.0
CB49 436.102 0.102 1.65 0.0 0.0
CB46 433.017 0.267 4.73 0.0 0.0
CB47 433.057 0.077 4.69 0.0 0.0
Gl-2 435.369 0.159 4.28 0.0 0.0
Gl-1 435.368 0.158 4.28 0.0 0.0
CB55 436.037 0.107 2.21 0.0 0.0
CB56 436.522 0.072 1.73 0.0 0.0
CB54 436.349 0.099 1.90 0.0 0.0
CB53 436.038 0.108 2.21 0.0 0.0
CB52 436.528 O.D78 1.72 0.0 0.0
CB51 436.349 0.099 1.90 0.0 0.0
OF 425.536 1.151 11.96 0.0 0.0
Node Output Data Summary for 100-year Event
Max Water Max Water Freeboard Duration of Duration of
Node Name Elevation (ft) Depth (ft) (ft) Surcharge (min) Flooding (min)
(810 436.596 0.086 1.32 0.0 0.0
C811 436.389 0.129 1.53 0.0 0.0
(812 436.123 0.163 1.80 0.0 0.0
(813 435.852 0.192 2.07 0.0 0.0
CB14 435.455 0.215 2.46 0.0 0.0
CB15 434.904 0.404 3.02 0.0 0.0
(816 434.691 0.421 3.23 0.0 0.0
CB17 434.457 0.437 3.46 0.0 0.0
[818 434.190 0.460 3.73 0.0 0.0
(819 433.960 0.480 3.96 0.0 0.0
(820 433.262 0.382 4.66 0.0 0.0
(821 432.971 0.391 4.95 0.0 0.0
(829 431.570 0.880 6.35 0.0 0.0
(828 435.361 0.231 2.39 0.0 0.0
(827 435.996 0.226 1.75 0.0 0.0
(826 436.565 0.145 1.18 0.0 0.0
(825 435.234 0.294 2.52 0.0 0.0
CB24 435.583 0.343 2.17 0.0 0.0
(823 436.179 0.219 1.57 0.0 0.0
(822 436.641 0.131 1.11 0.0 0.0
CB37 431.737 0.757 6.18 0.0 0.0
CB35 436.109 0.229 1.64 0.0 0.0
(836 435.243 0.233 2.51 0.0 0.0
(834 436.565 0.145 1.19 0.0 0.0
C850 431.982 0.622 5.94 0.0 0.0
(848 432.237 0.577 5.51 0.0 0.0
(845 433.065 0.535 4.69 0.0 0.0
CBS7 434.610 0.500 3.14 0.0 0.0
CB44 434.918 0.478 2.83 0.0 0.0
(843 435.023 0.483 2.73 0.0 0.0
CB41 435.808 0.318 1.94 0.0 0.0
CB39 436.453 0.243 1.30 0.0 0.0
CB38 436.664 0.154 1.09 0.0 0.0
CB33 435.234 0.314 2.52 0.0 0.0
(832 435.509 0.269 2.24 0.0 0.0
CB31 436.180 0.220 1.57 0.0 0.0
CB30 436.641 0.131 1.11 0.0 0.0
CB40 436.567 0.117 0.97 0.0 0.0
CB42 436.373 0.123 1.13 0.0 0.0
CB58 436.105 0.105 1.40 0.0 0.0
CB49 436.110 0.110 1.64 0.0 0.0
CB46 433.066 0.316 4.68 0.0 0.0
CB47 433.081 0.101 4.67 0.0 0.0
Gl-2 435.382 0.172 4.27 0.0 0.0
Gl-1 435.382 0.172 4.27 0.0 0.0
C855 436.045 0.115 2.20 0.0 0.0
C856 436.528 0.078 1.72 0.0 0.0
CB54 436.357 0.107 1.89 0.0 0.0
CB53 436.047 0.117 2.20 0.0 0.0
CB52 436.534 0.084 1.72 0.0 0.0
CB51 436.357 0.107 1.89 0.0 0.0
Pond 429.500 5.105 8.00 0.0 0.0
OF 425.536 1.151 11.96 101.135 0.0
Link Output Data Summary for 25-year Event
Max Max
Upstream Downstream Design Full Max Depth Max d/D Max Flow Tailwater Headwater
link Name Node Name Node Name Flow (cfs) (ft) (depth/diameter) (els) (ft) (ft)
link4 (810 (811 0.94 0.119 0.177 0.028 436.379 436.590
Links CB11 (812 0.94 0.150 0.225 0.064 436.110 436.379
Link6 CB12 CB13 0.94 0.177 0.264 0.104 435.837 436.110
link7 (813 (814 0.94 0.177 0.264 0.140 435.581 435.837
Link8 (814 (815 0.94 0.198 0.296 0.176 435.112 435.438
Link9 C815 C816 0.94 0.378 0.564 0.531 434.648 434.864
LinklO (816 (817 0.94 0.391 0.584 0.564 434.411 434.648
Link11 (817 (818 0.95 0.411 0.613 0.600 434.141 434.411
Link12 C818 C819 0.94 0.431 0.644 0.637 433.911 434.141
Link13 (819 C820 0.91 0.431 0.644 0.675 433.596 433.911
Link14 (820 (821 2.73 0.358 0.358 0.715 432.938 433.230
Link15 (821 (829 2.71 0.358 0.358 0.743 432.618 432.938
Link54 C829 Pond 2.73 0.786 0.786 2.842 431.223 431.476
Link18 (828 C829 2.73 0.213 0.213 0.271 435.042 435.343
Link17 C827 C828 0.94 0.208 0.311 0.193 435.431 435.978
link16 C826 C827 0.94 0.134 0.201 0.080 435.998 436.554
link22 C825 C815 0.95 0.270 0.403 0.319 434.864 435.210
link21 C824 C825 1.10 0.240 0.358 0.263 435.210 435.563
Link20 CB23 CB24 0.94 0.202 0.301 0.181 435.605 436.162
Linkl9 CB22 CB23 0.94 0.202 0.301 0.067 436.162 436.631
Link30 CB37 C829 2.73 0.786 0.786 1.788 431.476 431.639
Link28 CB35 C836 0.94 0.210 0.314 0.196 435.543 436.090
Link29 CB36 CB37 2.73 0.215 0.215 0.276 434.924 435.225
Link27 C834 C835 0.94 0.210 0.314 0.082 436.090 436.554
Link39 C850 CB37 2.73 0.659 0.659 1.472 431.639 431.908
Link38 C848 C850 2.73 0.548 0.548 1.411 431.908 432.178
Link37 C845 CB48 2.73 0.485 0.485 1.292 432.470 433.015
Link36 C857 C845 2.73 0.456 0.456 1.161 434.264 434.566
Link35 CB44 (857 2.75 0.456 0.456 1.066 434.566 434.875
Link34 CB43 (844 2.11 0.442 0.442 0.879 434.875 434.982
Link33 CB41 (843 0.94 0.291 0.434 0.359 435.398 435.780
Link32 CB39 CB41 0.94 0.223 0.333 0.220 435.875 436.433
Link31 CB38 CB39 0.94 0.223 0.333 0.093 436.433 436.652
Link26 CB33 CB43 0.94 0.442 0.659 0.324 434.981 435.203
Link25 CB32 CB33 0.94 0.283 0.422 0.266 435.203 435.485
Link24 CB31 CB32 0.94 0.203 0.303 0.183 435.606 436.163
Link23 C830 CB31 0.94 0.203 0.303 0.067 436.163 436.631
Link44 C840 CB39 0.94 0.183 0.273 0.053 436.433 436.558
Link43 CB42 CB41 0.94 0.114 0.170 0.057 436.158 436.364
Link42 CB58 (857 0.94 0.097 0.145 0.041 435.890 436.097
Link40 CB49 (848 0.94 0.102 0.152 0.045 435.895 436.102
Link41 C846 CB45 0.94 0.415 0.620 0.071 433.015 433.017
Link45 CB47 CB46 0.95 0.267 0.398 0.026 433.017 433.057
Link46 Gl-2 (843 1.03 0.192 0.286 0.127 434.981 435.369
Link47 Gl-1 C844 1.03 0.158 0.236 0.126 434.948 435.368
Link51 C855 Gl-1 0.47 0.107 0.213 0.047 435.816 436.037
LinkSO C856 C855 0.52 0.107 0.213 0.024 436.037 436.522
link52 C854 Gl-1 0.47 0.099 0.198 0.039 435.937 436.349
Link49 (853 Gl-2 0.47 0.108 0.216 0.048 435.817 436.038
Link48 C852 C853 0.47 0.078 0.156 0.024 436.105 436.528
Link53 C851 Gl-2 0.47 0.099 0.198 0.039 435.937 436.349
Link56 Pond OF 0.00 -9.00E+99 0.000 0.000 0.000 0.000
Link56 Pond OF 8.95 5.103 4.434 16.008 425.536 429.135
link56 Pond OF 41.69 0.253 0.119 0.068 429.322 429.478
Link56 Pond OF 35.63 -9.00E+99 0.000 0.000 0.000 0.000
Link Output Data Summary for 100-year Event
Maxd/D Max Max
Upstream Downstream Design Full Max (depth/ Max Flow Tailwater Headwater
Link Name Node Name Node Name Flow (cfs) Depth (ft) diameter) (els) (ft) (ft)
Link4 CB10 CB11 0.94 0.129 0.192 0.033 436.389 436.596
Links CB11 CB12 0.94 0.163 0.243 0.076 436.123 436.389
Link6 CB12 CB13 0.94 0.192 0.286 0.122 435.852 436.123
Link7 CB13 CB14 0.94 0.192 0.286 0.165 435.596 435.852
Link8 CB14 CB15 0.94 0.215 0.321 0.206 435.128 435.455
Link9 CB15 CB16 0.94 0.421 0.628 0.623 434.691 434.904
LinklO CB16 CB17 0.94 0.437 0.652 0.662 434.457 434.691
Linkll CB17 CB18 0.95 0.460 0.687 0.704 434.190 434.457
Link12 CB18 CB19 0.94 0.480 0.717 0.749 433.960 434.190
Link13 CB19 CB20 0.91 0.480 0.717 0.792 433.630 433.960
Link14 CB20 CB21 2.73 0.391 0.391 0.840 432.971 433.262
Link15 CB21 CB29 2.71 0.391 0.391 0.873 432.650 432.971
Link54 CB29 Pond 2.73 0.880 0.880 3.339 431.281 431.570
Link18 CB28 CB29 2.73 0.231 0.231 0.318 435.060 435.361
Link17 CB27 CB28 0.94 0.226 0.338 0.226 435.449 435.996
Link16 CB26 CB27 0.94 0.145 0.217 0.094 436.009 436.565
Link22 CB25 CB15 0.95 0.304 0.454 0.375 434.904 435.234
Link21 CB24 CB25 1.10 0.264 0.394 0.309 435.234 435.583
Link20 CB23 CB24 0.94 0.219 0.327 0.213 435.622 436.179
Link19 CB22 CB23 0.94 0.219 0.327 0.079 436.179 436.641
Link30 CB37 CB29 2.73 0.880 0.880 2.101 431.570 431.737
Link28 CB35 CB36 0.94 0.229 0.341 0.231 435.561 436.109
Link29 CB36 CB37 2.73 0.233 0.233 0.324 434.942 435.243
Link27 CB34 CB35 0.94 0.229 0.341 0.096 436.109 436.565
Link39 CB50 CB37 2.73 0.757 0.757 1.729 431.737 431.982
Link38 CB48 CB50 2.73 0.622 0.622 1.658 431.982 432.237
Link37 CB45 CB48 2.73 0.535 0.535 1.518 432.512 433.065
Link36 CB57 CB45 2.73 0.500 0.500 1.364 434.304 434.610
Link35 CB44 CB57 2.75 0.500 0.500 1.252 434.610 434.918
Link34 CB43 CB44 2.11 0.483 0.483 1.033 434.918 435.023
Link33 CB41 CB43 0.94 0.318 0.475 0.422 435.422 435.808
Link32 CB39 CB41 0.94 0.243 0.362 0.258 435.894 436.453
Link31 CB38 CB39 0.94 0.243 0.362 0.109 436.453 436.664
Link26 CB33 CB43 0.94 0.483 0.722 0.381 435.023 435.234
Link25 CB32 CB33 0.94 0.314 0.469 0.313 435.234 435.509
Link24 CB31 CB32 0.94 0.220 0.329 0.215 435.623 436.180
Link23 CB30 CB31 0.94 0.220 0.329 0.079 436.180 436.641
Link44 CB40 CB39 0.94 0.203 0.303 0.062 436.453 436.567
Link43 CB42 CB41 0.94 0.123 0.184 0.067 436.167 436.373
Link42 CB58 CB57 0.94 0.105 0.156 0.048 435.898 436.105
Link40 CB49 CB48 0.94 0.110 0.164 0.053 435.903 436.110
Link41 CB46 CB45 0.94 0.465 0.694 0,084 433.060 433.062
Link45 CB47 CB46 0.95 0.316 0.472 0.031 433.066 433.081
Link46 Gl-2 CB43 1.03 0.233 0.348 0.149 435.023 435.382
Link47 Gl-1 (844 1.03 0.172 0.256 0.148 434.961 435.382
Link51 CB55 Gl-1 0.47 0.115 0.231 0.055 435.825 436,045
Link50 CB56 CB55 0.52 0.115 0.231 0.028 436.045 436.528
Link52 CB54 Gl-1 0.47 0.107 0.214 0.046 435.945 436.357
Link49 CB53 Gl-2 0.47 0.117 0.234 0.057 435.827 436.047
Link48 CB52 CB53 0.47 0.084 0.168 0.028 436,112 436.534
Link53 CBS! Gl-2 0.47 0.107 0.214 0.046 435.945 436.357
Link55 Pond OF 0.00 -9.00E+99 0 0 0 0
Link55 Pond OF 8.95 5.103 4.434 16.008 425.536 429.135
Link55 Pond OF 41.69 0.253 0.119 0.068 429.322 429.478
LinkSS Pond OF 35.63 -9.00E+99 a a 0 0
This page intentionally left blank.
Appendix F
CSWPPP
Stormwater Pollution Prevention Plan
owner
Puget Sound Energy
355 110th Avenue NE
Bellevue, WA 98009
For
Talbot Hill Substation
Prepared for
City of Renton
1055 South Grady Way
Renton, WA 98057
Project Site Location
Puget Drive SE in Renton, WA.
Erosion and Sediment Control Lead:
Phone:
SWPPP Prepared By
HOR Engineering
500 108th Avenue NE Suite 1200
Bellevue, WA 98008-5549
SWPPP Preparation Date
10/4/2016
Approximate Project Construction Start Date
April-May 2017
Operator
TBD
1-)~
Contact Information
Title Nilmels) Pfione Nurnber . ,.''
Certified Erosion and Sediment Control Lead TBD TBD
Emergency Owner Contact TBD TBD
Emergency Oil Spill Response TBD TBD
Owner / Operator Contact TBD TBD
Table of Contents
Stormwater Pollution Prevention plan ............... 1
Appendix A: Site Plan ..................................... 5
Recommended Construction Sequence
1. Pre-construction meeting.
2. Post notice of construction activity sign with name and phone number of CESCL.
3. Flag or fence clearing limits.
4. Install catch basin protection where required.
5. Install perimeter protection (silt fence).
6. Construct surface water controls simultaneously with clearing and grading for project development.
7. Maintain erosion control measures in accordance with City of Renton Standards and Manufacturers
recommendations.
8. Relocate surface water controls and erosion control measures or install new measurers so that as
site conditions change the erosion and sediment control is always in accordance with the City of
Renton Erosion and Sediment Control Standards.
9. Cover all areas that will be unworked for more than seven days during the dry season or two days
during the wet season with straw, wood fiber mulch, compost, plastic sheeting, or equivalent.
10. Stabilize all areas that reach final grade within seven days.
11. Seed or sod any areas to remain unworked for more than 30 days.
12. Upon completion of the project, all disturbed areas must be stabilized and best management
practices removed if appropriate.
Design Standards
The Washington State Department of Ecology (DOE) 2012 Stormwater Management Manual for
Western Washington (SWMMWW)
King County 1998 Erosion and Sediment Control Standards
City of Renton Amendment to the 2009 King County Surface Water Design Manual
500 1081h Ave NE. Suite 1200, Bellevue, WA 98004-5549
(425) 450-6200
hdrlnc.com
Introduction
This Stormwater Pollution Prevention Plan (SW PPP) has been prepared as part of the National Pollutant
Discharge Elimination System (NP DES) stormwater permit requirements for the proposed work associated
with the Talbot Hill Substation project.
This SWPPP will be revised as necessary to reflect the Contractor's means and methods and all revisions
will be in compliance with the best management practices (BMPs) presented in this SWPPP.
The purpose of this SWPPP is to describe the proposed construction activities and all temporary and
permanent erosion and sediment control (TESC) measures, pollution prevention measures,
inspection/monitoring activities, and recordkeeping that will be implemented during the proposed utility
work. The objectives of the SW PPP are to:
1. Implement BMPs to prevent erosion and sedimentation, and to identify, reduce, eliminate or
prevent stormwater contamination and water pollution from construction activity.
2. Prevent violations of surface water quality, ground water quality, or sediment management
standards.
3. Prevent adverse water quality impacts during the construction phase, including impacts on
beneficial uses of the receiving water by controlling peak flow rates and volumes of stormwater
runoff at the Permittee's outfalls and downstream of the outfalls.
Site Description
Existing Conditions
The Talbot Substation covers approximately 7.75 acres between Beacon Way South, South Puget Drive,
and Grant Ave South in Renton. The site is located near the top of a ridge and is primarily accessed from
South Puget Drive, which ties into a gravel driveway leading to the site. The topography inside the
substation slopes slightly away from the center to promote drainage away from electrical equipment. The
existing grade outside the substation fence generally slopes away from the substation except on the
eastern and northwestern sides where there is elevated terrain.
In general stormwater runoff flows outwards from the middle of the substation. Areas of localized ponding
occur on the eastern and northwestern sides of the site where stormwater is constrained by elevated
terrain outside the substation fence. Existing drainage pipes on the northeast and southeast sides of the
substation are tied to catch basins within the fence line whose rims are slightly raised above the yard rock,
preventing them from capturing and conveying flow outside of the substation. The perimeter path on the
northeastern side of the substation is slightly higher than the existing grade within the fence line, preventing
flow from draining off the site along this edge. An elevated field along the eastern edge of the site prevents
drainage away from the substation on this side. Along the southern edge of the substation, runoff is able to
flow south across the southern perimeter path and into a depression located between the substation and
access road. This route presents the least constrained flow path for stormwater to exit the project area. The
depression is then drained by a culvert beneath the access road to a second depression which drains
eastwards, paralleling a gravel access road towards Grant Avenue South.
Seven borings were performed as part of a geotechnical study at the project area. Five of these borings
were performed inside the substation, and these discovered several feet of fill soils overlying seven to
twenty three feet of glacial till. In the area of the proposed stormwater detention pond two borings were
2
1-)~
performed which discovered several feet of loose sand and organic topsoil overlying glacial till. Advance
outwash deposits were found below the till soils in all boring samples. No groundwater was encountered at
the project site (GeoEngineers, 2016).
Proposed Construction Activities
The scope of this SWPPP for the Talbot Hill Substation is limited to:
• the installation of all new substation components within the fence line of the existing substation,
• the installation of the new substation perimeter fence,
• the paving of the existing access road,
• and the installation of the proposed stormwater detention pond, its control structure, and inlet and
outlet located at the southeast corner of the substation,
All work except for the pond construction and roadway repaving is being completed within the proposed
substation fenceline. Below is a site detail summary, giving the approximate area of the utility improvement
corridor and impervious areas affected by the utility work.
Total Site Area (ac): 5.89
Approximate Percent Impervious Before Construction (%): 56
Approximate Percent Impervious After Construction (%): 65
Disturbed Area During Construction (ac): 4.65
Approximate Excavation Volume (CY): 12,400
ESC Measures
Clearing Limits
To protect adjacent properties and reduce the volume of soil exposed to construction, construction limits
will be clearly marked where necessary before construction begins. The construction of the proposed
stormwater detention pond and paving of the existing access road will be the only ground disturbing activity
occurring outside of the substation fence. Natural vegetation and topsoil at the project area shall be
retained to the maximum extent feasible. High visibility fence and silt fence BMPs will be used around the
perimeter of the project area to ensure disturbance is kept to a minimum outside the work area.
Installation Schedules: High visibility fence and silt fence will be installed before site disturbing activities
begin.
Inspection and Maintenance plan: Inspect the fence once every calendar week, and within 24 hours of any
stormwater or non-stormwater discharge from the project site. Repair any damage to the high visibility
fence immediately.
Cover Measures
As the project is located west of the Cascade Mountain Crest, no soils shall remain exposed and unworked
for more than seven days during the dry season (May 1 to September 30) and two days during the wet
season (October 1 to April 30). Between these times, exposed soils stored aboveground shall be protected
with straw, wood fiber mulch, compost, plastic sheeting, or equivalent. Regardless of time, all soils shall be
500 108th Ave NE, Suite 1200, Bellevue. WA 98004-5549
(425) 450-6200
hdrinc.com
stabilized at the end of the shift before a holiday or weekend, and if needed, based on weather forecasts.
Any areas expected to remain unworked for greater than 30 days must be seeded or sodded (King County,
1998). During the wet season, soil stockpiles with slopes greater than or equal to 3H:1 V, or with over ten
feet of vertical relief must be covered if they will remain unworked for over 12 hours. During the wet season
sufficient cover materials to stabilize all disturbed areas must be stockpiled on site, and the Wet Season
Provisions of Section D.5.s of the King County Erosion and Sediment Control Standards must be followed
(King County, 1998). Permanent stabilization will be achieved by placement of yard rock within the
substation, and seeding at the proposed stormwater detention pond.
Installation Schedules: BMPs will be installed as necessary on a temporary basis during construction.
Inspection and Maintenance plan: Inspect once every calendar week, and within 24 hours of any
stormwater or non-stormwater discharge from the project site. Repair or replace damaged BMPs
immediately.
Perimeter Protection
Vegetation and slope characteristics vary within the project area. The eastern edge of the project area is
elevated and there is no risk contaminated stormwater will exit the project site in that area. The proposed
stormwater detention pond and its outlet structure will be installed along the southern edge of the project
area. Silt fence will be installed in this area to ensure no contaminated stormwater exits the project area.
Silt fencing will extend along the existing access road to its intersection with Puget Drive Southeast to
prevent sediment generated from the proposed paving activities from exiting the project site.
Concrete will be poured on site for proposed electrical equipment foundations within the substation. All
concrete at the project area will be handled such that no cementitious material will enter stormwater runoff.
Handling procedures are detailed on the TESC plans.
Installation Schedules: Silt fence will be installed prior to ground disturbing activities. Concrete pouring and
handling procedures will be adhered to at all times.
Inspection and Maintenance plan: Inspect once every calendar week, and within 24 hours of any
stormwater or non-stormwater discharge from the project site. Repair or replace damaged BMPs
immediately.
Traffic Area Stabilization
The project area will be accessed from the existing access road located on the southern edge of the
substation. This access road is a stabilized surface and does not require additional stabilization. Proposed
stormwater detention pond construction and access road paving will occur from the existing access road.
Sediment Retention
The proposed stormwater detention pond will be retrofitted as a temporary sediment storage facility for the
duration of the project. All open grate catch basins and inlets located at the project area will be protected
with storm drain inlet protection in order to prevent sediment contamination from entering the conveyance
system.
3
1-)~
Installation Schedules: The proposed stormwater detention pond will be retrofitted as a sediment storage
facility once pond construction is complete. The sediment pond must have adequate surface area as
defined in Section D.4.5.2 of the King County Erosion and Sediment Control Standards (King County,
1998).
Required Pond Surface Area at top of Riser -SA = 2 x Q,/0.00096
Proposed 2-year Peak Flow -0 2 = 0.079 Cubic Feet per Second
Required SA = 165 Square Feet
Provided SA= -19,000 Square Feet
Install storm drain inlet protection as soon as catch basin and inlet facilities are constructed. Conveyance
pipes will be connected after inlet protection has been fitted to structures.
Inspection and Maintenance plan: Inspect all BMPs once every calendar week, and within 24 hours of any
stormwater or non-stormwater discharge from the project site. Sediment shall be removed from the pond
when it reaches a depth of one foot. Any damage to embankments or slopes shall be repaired immediately
upon observation. Any sediment accumulated on or around storm drain inlet protection filter fabric shall be
removed and disposed of offsite. Accumulated sediment will not be washed with water. Sediment will be
removed from within the catch basin once it has filled 1/3 of the available space within the inlet protection
insert (King County, 1998).
Surface Water Collection
Outlet protection will be installed at the outlet of the proposed stormwater detention pond before
stormwater is routed through the facility.
Installation Schedules: Will be installed once the proposed stormwater detention pond is completed, prior
to discharge through the facility and retrofit as a temporary sediment pond.
Inspection and Maintenance plan: Inspect once every calendar week, and within 24 hours of any
stormwater or non-stormwater discharge from the project site. If there is scour observed at the outlet, the
eroded area shall be protected with more conservative measures.
Dewatering Control
Dewatering is not anticipated at the project site, as groundwater was not encountered during field activities
performed by GeoEngineers (GeoEngineers, 2016).
Dust Control
Wind transport of soils is not anticipated at the project site. Exposed soils will be stabilized and will not
remain exposed for long periods.
Flow Control
The project area triggers Core Requirement #3: Flow Control. The proposed stormwater detention pond will
be retrofitted to serve as a sediment pond during construction. During this period, the hydraulic control
structure and pond will continue to function as flow control facility's and restrict flow rates exiting the site to
acceptable limits.
500 108th Ave NE, Suite 1200, Bellevue, WA 98004-5549
(425) 450-6200
hdrinc.com
Maintain BMPs
All temporary and permanent erosion and sediment control BMPs will be maintained and repaired as
needed to assure continued performance of their intended function. Maintenance and repair will be
conducted as noted above. Visual monitoring of the BMPs will be conducted at least once every calendar
week and within 24 hours of any stormwater or non-stormwater discharge from the project site. If the
project site becomes inactive and is temporarily stabilized, the inspection frequency will be reduced to once
every month (Washington State Department of Ecology, 2012).
All temporary erosion and sediment control BMPs will be removed within 30 days after the final site
stabilization is achieved or after the temporary BMPs are no longer needed. Trapped sediment will be
removed and disposed of in an approved offsite location. Disturbed soil resulting from removal of BMPs or
vegetation will be permanently stabilized.
Manage the Project
Sediment and erosion will be controlled locally around excavations and all TESC measures will be
maintained in a functional condition at all times. The SWPPP shall be modified whenever there is a change
in the design, construction, operation, or maintenance at the construction site that has, or could have, a
significant effect on the discharge of pollutants to waters of the state. The SWPPP shall be modified if,
during inspections or investigations, it is determined that the SWPPP is ineffective in eliminating or
significantly minimizing pollutants in stormwater discharges from the site. The SWPPP shall be modified as
necessary to include additional or modified BMPs designed to correct problems identified. Revisions to the
SWPPP shall be completed within seven days following the inspection. The SWPPP will be updated,
maintained, and implemented in accordance with Special Conditions S3, S4, and S9 of the CSWGP. Site
inspections will be conducted in accordance with Special Condition S4 of the CSWGP.
Construction Schedule
Construction at the site will be phased and the majority of the project work will begin between April and
May of 2017. A small amount of additional site work will occur during the same period in 2018. The TESC
practices prescribed in this document will be employed during both periods.
Recordkeeping and Reporting
A copy of the SWPPP shall be retained on site at all times. Records will be retained during the life of the
project and for a minimum of three years following project completion. Several other documents must also
be retained at the site and easily accessible. They are as follows:
• General Permit
• Notice of Authorization Letter
Copies of the SWPPP shall be provided to Ecology within 14 days of receiving a written request, and
furnished to the public provided the request is in writing and per permit condition S5.G of the Construction
Stormwater General Permit (Washington State Department of Ecology, 2010).
Following the failure to meet any of the terms and conditions of the permit and causing a threat to humans
or the environment:
4
1-)~
• Ecology must be notified immediately of the failure
• Action must be taken to deal with the issue immediately
• A report must be submitted to Ecology within five days of the failure to meet terms or conditions
• An application form covered by the General Permit must be turned in to Ecology and any applicable
local jurisdiction
The SWPPP will be modified if it is ineffective in preventing stormwater borne pollutants from leaving the
project site, or if there have been any changes which could have a significant impact on real or potential
discharge of pollutants to state-owned water bodies. The SWPPP must be modified within seven days after
determining that additional or modified BMPs are needed to correct problems. Accompanying these
changes, an updated BMP implementation schedule will be created.
Inspection and Monitoring
All BMPs will be inspected, maintained, and repaired as needed to assure continued performance of their
intended function. Site inspections must occur at least once a week, and within 24 hours of any discharge
from the project site. Stormwater will be inspected for suspended sediment, turbidity, discoloration, and oily
sheen. If there is a visible change in discharge during the day it is recommended that a second sample is
taken. The procedure for discharge sampling is as follows:
• Take one sample from just upstream of the discharge point to establish baseline turbidity levels and
temperature.
• Take a second sample of the project water at the discharge point.
• Take a third sample several feet downstream of the discharge point.
The effectiveness of all installed BMPs will determine if additional BMPs are necessary to better the quality
of stormwater discharge.
References
United States Department of Agriculture. (2013, December 6). Web Soil Survey. Retrieved August 5, 2014,
from Natural Resources Conservation Service:
http://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx
Environmental Protection Agency. (2008). Watershed Assessment Tracking and Environmental Results.
Retrieved January 22, 2015, from United States Environmental Protection Agency:
http://ofmpub.epa.gov/tmdl_waters1 0/attains_watershed.control?p_huc= 17110019&p_cycle=&p_re
po rt_ type= T
King County. (2009). Surface Water Design Manual. Seattle: King County .
Washington State Department of Ecology. (2010). Construction Stormwater General Permit. Lacey:
Wasington State Department of Ecology.
Washington State Department of Ecology. (2012). Stormwater Management Manual for Western
Washington. Lacey: Washington State Department of Ecology.
500 108th Ave NE, Suite 1200, Bellevue, WA 98004-5549
I 425) 450-6200
hdrinc.com
5
Appendix A
TESC Plans
500 108th Ave NE, Suite 1200, Bellevue, WA 98004-5549
(425) 450-6200
1-)~
hdrinc.com
This page intentionally left blank
6
500 108th Ave NE, Suite 1200, Bellevue, WA 98004-5549
(425) 450-6200
1-)~
hdrinc.com
. .
~
.
w . <
0 .
RECOMMENDED CONSTRUCTION SEQUENCE RECOMMENDED CONSTRUCTION SEQUENCE (CONTINUED)
'.
,.
4.
s.
6.
7.
PRE-CONSTRUCTION r.tEET!NG.
POST NOIJCf:. OF CO'iSTHUCT[DN ACTJVITY SIGN w1rH NAME AND PHOM£
NUMBER OF r.F SCI •
,.
,.
RELOCATE SURFACE WATER CONTROLS ANO EROSION CONTR:L MEASURES OR INSTAI I NFW
r.tEASLIRES SO ThAT AS s:TE CONDITIONS CIIANG[ TH[ UlOSfON /,ND SEO[MENT CONTRO_ JS
ALWAYS IN ACCOROANU WITH Th£ Cl~Y OF RENTO~ HIOSION ANO SEDIMENT CONTROL SlANlJAHDS, --=,-Z-=
MATCH LINE -SEET SHEET 2 covrn Al L AREAS THAT Wll L. 6[ UN'IIORKEO FOR MOR[ THAN SEVFN DAYS OUR ING THE ORY
SEASON Oil TWO DAYS DURING lHE WET SEASON WlTH STRAW, WOOD F!BER MULC~. COMPOST,
PLASTIC SHEETING OR EOUl\lAI FNT,
FLAG OR FENCE CLEARING LIM!TS,
INSTALL CATCH BASIN PROTECTION (F REQUIRED.
,o. STABtL12E ALL AREAS THAT REACH FINAL GRADE wn11:N SEVEN DAYS.
/
/
/
\
. j~;~·~~=;~-::~c-.\o n~l, 1\\
·/J;...1 1XB~~~-...-~r.-~ · 11
-/ -·t. /ii, f' 1 I f.@;;:::.~'2.2,: C'-.":z_~ . ( ' , ·11· 1'1" (j!(~"'-~~"0! ~ I
'' < / . _. < 'l 1:i1~Jlf'l1 ~~~ ~ . ) ,£/ Q tiMnNG~ \ b~~~c~Ig~r~l6J"ILITY j~U'.· 11i~;1l11II \\=';~~~~~-
' n , _l_ , _ _ ~~~s~~JJ~N/ENg~. It· II. 1\,. '\' }~~~~~
----··------·-·· -------·-_ _ _ • DETAIL 3 1· w ," · oi?~'""
~~=s==-,=--=~ ---I I
l~STA~L PERIMETER PROTECTION IS1LT FENCE, El'WSI-! BARRIER, ETC.),
CONSTRUCT S~'RFACE WATER CONTROLS I !NTERCFPTOR DIKE'S, PIPE SLnPF
DRAINS, ETC.) SJMULTANEOUSLY WITH CLEARING AND GRAO)t\G FOR
PROJECT DEVELOPMENT.
11. SEED OR SOD ANY AREAS TO REMAIN UNWCRKEO FOR MC1PE THA'J 30 DAYS.
12-UP:N CO~PLE-:-!QN OF Tl-lE PROJECL ALL DISTURl!E.ll AREAS MUST llE STABILIZED ANO BEST
MA,\AGEMC:NI PRACTJCC.S REMOVED IF APPROPRIATE.
hMJNTAIN EROSION CONTROL MEIi.SURES IN ACCORDANCE W[TII CITY OR RENTON
ST ANDAROS A ~D MA~UF ACTURER' S REC0!,11,!ENOA TI DNS.
// /'
____ :.:::.T '
\ .
:]~TI•···;;:-·· -~:.-·::·::···,~f+''_'•,ifjf." '.' ''"!"±{):'<··.:·;-··~······:~ frl*+'· '><-'·• ·,:,··'"'N:,,' +_.,,., .• ,,, ..
L LJ L, L·, L', LJ L, I_, L, I L, '-' L, L::1 LJ L, L·, I..:, L, L·,
ll Ii ., .
CJ ~; '.: 1:,; c: c; c,1 '.: :·: c;J c~ c; c,; ,-:, c-: c; c: LJ '..: ~.; c·:
' V
·1
I ~u
I
i:'.:.:_-1 ;1 ._ I,
I
/
/
\ i
I
I
I
I
/'SlL T.
/ FENCE
r ---,
'
1-1
' ' _J
,-:
'
1-1
' ' -J
,-1
' ' .. J
;-,
_J ' ' ' _J
1-1
' ' -.,
1-,
' ' _J
,-1
' ' -J
,-,
' ' -J
' ' ' • "
'--1 I I __ J L L-J
~--:-------·1----------_.,. --, = =: --------i-: ==----a&---; = =.-. ---II,
,---, I : --, :· II ,--·: :---,
1-1
.J
. , Iii : : ,-. 1r
~:~-==" ===~lL:=-===G==~~~-===.===_=i -~-~~,_~= .. _=~ = = __ = = =_" =_ ~ = 41 _J,l
.,
' ' ~-I
L;
L,
·,
' ' ~ _I
r,, '_,
L,;
c:
,·
' L
I',
c,;
I-~
' LC
L1
C'
' ~ _I
c,~
~,;
.,
' ' ~ _I
L'
r~
·,
' ' ~ _I
L·;
c-:
. -,
' ' ~-I
·,
' ' '. _I
'·'
c:
L·~
''
' ' '
~-I
_., c;
' ' ' • ' ' " ' " ' " ' '
,-1
' ' --'
,-,
' ' .J
1·-1
' ' .J
: '
' ' -J
,-1
' ' ,J
I -I
' '
__ ,
'-,
' ' .J
1-1
' ' -J
-=======m===41------£>---------•••·--------&--••---I C I
NSERT ~ .·, ,, 'IJ
BAS IN CH w NTO " h4C
me".oo;, ,m,., I ""•. ~'.¥ do~~E~E~ts-=Dt··."'l{.,:
!Nllc·" ~ UCSe -'~'"'·"· ·····c._f:; I ---,, ' _ ...,. -L I" -----1li .. ... i
i"' Ii ·1 ' ' ' ~ _I ~-
L •
........ , , •••a ..... c ... _ a a•••• --• aa a···• •. ·· --· •• · • • -----•c Ce CCC CC CCC C ----• "" --• --• ·· ·· -•-• --·'" • •• • -------:: :: • ' : : r:r==n
11 II I I I I 11n1
II 11 I II II USE HIGH-VISIBILITY-___,-............. .
FENCE OUTSIDE OF I~ :: ·. II II I I II 11
11 II I : : .all.
1; ,i I a 8 tif a • •1 a \. ..
• • ' II ~/ ' ~····F I j~"/i<<·
SUBSTATION FENCE, ( /~ = SEE SHEET 3, DETAIL 3 '-..-
li.:~ r\
1' ,,
1-:---<,, I
\ ,;.
'1·--1
'
~~~~r
"'
/
I
I
I,
I
I
,'\
I
:
\
\
SILT FENCE/
CONSTRUCTION LIM!TS.
SFF SHFFT 3,
DETAIL 4
KEY DIVIDER INTO
SLOPE TO PREVENT
FLOW AROLND SIDES
""";--SILT FENCE OH
1 EQUIVALENT DIVIDER.
I
\ SHOULD BE PLACED SUCH
1THAT POND VOLUME IS
jEFFECT IVEL Y SPLIT 50/50
I ,,
' I
I I
'TEMPORARY SEDIMENT
PONO RISER. SEE
SHEET 3, DETAIL 2
I , ,
l~'\-·' ,.-' \
' .. ·\-\
RIP RAP SHALL BE
. -6 TO 8 11 ANGULAR
),ROCK, 18 11 DEEP
/ AND SHALL BE
10 1 L x lO'W
CENTERED ON TRASH
RACK .
' I
I
I
J
I
\
TOPO LEGEND
~ATCH LIN~'.~~~~~ !:~~ ;-, •----------------0 ~-----------------.a J D~U_CJ
I ,--~ '.' . ',: ,---' I D : • ' . "I : I LEGEND: I I 1, 1 I j 11 I II : I I; I I. I I " { \ ---·--------
9-J:t
-0-pp = -;
a
"• " +
~
1~~~
Q
0
" ~
D
D
""
t.<~LN~ C>', L•~c
(x,Sf.N~ O.-E"Ot1C"1l PUW!'R liNE
FXISTt<G UNOCRcRCU~D TFcr~st..sr
""' NG UN.OE~~,w~o PCW!'S
E(ISfK~ ,1s:,p UHC
!CXIST~G CYCL.Ct,E; fl:H~C UN£
d1Sl NC >poolHTY L."l
?[}'l,(R POcf: ~/ LL.Ml~;,;,:
POWSR POL[
EX15lSG 51G'
rns~NG ~u,-•N:HCS
EX1s1,~ SWECT ur;..-
rns,,c CATGH &"5 ...
[L[C"RICl.t. ao,
BENC~va>K
E:<lS""G T[((PHOH> MANHOl.i
U•'i'1~G SlOR~ CRMJ MASHrlr,F:
~,OS'ISC flRr li"~R•Nf
i:X-S~HC D[C OWCUS TR[E(~'A J
RE8AR/c,a Mt,R~(D ·,,oo.£ ,,,,,._,·
Exo'\n~c SJ~,A~,' M(lNJ,..,,HT
F<STIN:; cc-scs~n:
f:'<S~'1:; GRA,D_
;;'~I :.LLYM![.l<
===='-' I '• d ' I,, ' II I I. I ' I' I --
1"'·"1 SPOT EL"'""' I ' , __ , " : ' ----' iVE I ======-~--1
-4-44-PROPOSED CONTOURS I a-----=--~=~~---~..a •=---=~----~==----=a :
---444 --· EXISTING CDNT:JURS L____ _ __________ ___Ji"";:I . --I
--it.--PR;JPERTY LINE 7
~
-----1
1 ____ ~
Cl
@
c=:J ..
Ill
CONSTRUCTION
STATION FENCE LIMITS CONCRETE HANDLING
SLOPE AND FLOW DIRECTION
FOUND A 11 ONS I REF O~L Y l
TYPE I CATCH BASIN lSEE DRA[~AGE PLAN)
·ypE II CATCH BASIN ISEE DRAINAGE PLANI
DITCH LINE
D~!VEWAY
CATCH BASIN INSERT
CLEARING DR CO~STRLJCTlON L IM!TS/HIGH VISI31L[TY FENCE
SILT FENCE
A lPRP.P
CONCRETE JR,JCK CHUTES. PUMPS, ANO JNTERNALS SHALL BE WASHED OUl
ONLY INTO A1' ECO-PAN.
2. UNUSEC· CONCRETE RFIAAlNING IN THE TRUCK AND PUMP SHALL EIE RETURNE_C.
TO THE ORIGINATING BATCH PLANT FOR HECYCLING.
J. HAND TOOLS INCLUDING. Bu: NOT LIMITED TO, SCREE:.us. SHUVELS. HAKES.
FLOATS, ANO TROWELS SHALL BE WASHt.l) OFF ONLY INTO Al.. ECO-PAN.
~. CO~TAlNlJ CONCRETE Sr!ALL BE DISPOSED OF IN A MANN[R THAT DOES
NOT VI DLA TE GROUND'NA Tl'R OR SURF ACE WATER DUAL! TY ST ANOARDS. DR
THE CONDITIONS OF THE NPDES PERMIT IF APPLICABLE.
s. CO~TAINE~S SHALL BE CHECKED FOR flDLES IN THE LINER JAILY DURING
CCNCRETE POURS AND REPAIRED Tf!E SAl,,ff DAY.
SO 0 30 60 ''° ~~ -I
GRAPH[C SCALE
1" ~ 30"
REFERENCE DRAWINGS
D-18730 SITE LAYOUT ANC GENERAL NOTES
D-18734 GRA/"llNG AND FFNC:JNG ~LAI..
D-16736 DRAINAGE PLAN
D-18737 FOUI..DATIDN PLAN
D-18738 STR!.2CTJRAL PLAN
'@CALL BEFORE
: " YOU DIG
· Cal I: TOLL FREE
, 1-800-424-5555
AEVIS!OH DESCRIFIIO~: IW!J NU'-!BER:111022315 TEMPORARY EROSION/SEDIMENT
CONTROL PLAN-230KV SWITCHYARD
TALBOT HILL SUBSTATION
PERMIT SUBMITTAL
DA TE ( 1,1/_Q/Y ) •~
""""
ICAO I .._:. Ne.-!~ =±(I 1111 [{.,
ENGINEER C. /?vss;e...l/ll -_'0_?°1J'j
REVIEWED SCALE:]"= 30'-0"
APPROVED J l,ji:IJ_f /I I /7 I/ft!_ ICADD NO: $$DGN1$
SUBSTATION
ENGINEERING
DEPARTMENT
CLASS: SITE
ORAW[NG NO AEV NO
D-18732 0
_SHEET: ~ rF~,
ICOD£: TAL
8
0
"
iii
~
0
--c';j
I
~ /
~ k Ifi I~
.-(•-.
"
m~x, ,,, .
w w
m
\ ·:,:;
.SILT,FE~CE __ : .... --<
W(ST ·,oF fjER£, ,'
SEE SHEE:1 3 ,, -
OE'.TA['L 4· ..
I
I
/
(
RECOMMENDED CONSTRUCTION SEQUENCE
srE SHE~-,
~
N ----7
\
~------
! -I --
~
I ' L USE HIGH VISIBIL !TY FENCE
OUTSIDE OF SUBSTATION !ENCE.
SEE SHEET 3, DETAIL 3
~~=;~~=:~~~f~~;2~~-?.a-
-""='·~·-
CONCRETE HANDLING
SEE SHEET 1
" " " ·/·/·/. . . / /./ ..
///
'/'/'/
'/'/'/ / ·x~/
"''-->::::'--. . /' ·x· ."--. -"',l,L' · .. // "-.,<
·-.J.-~· / ··. ·:---._,; -....... ' -->~ <~:~~,
~\:\\\ ,'
\~\ \·•'\
. .'.\\ \
\\~· I_.../--·-... -~~r
'.J' ! I I I ·
J/'
'/'·
/ /. ·/ Ir
( l
-Q~C: ~"GEfJ['
\>--0 v,,
/
/
= --,
" °" " +
"'
~C~h
fJ,
0
©
0
LJ
[~
"'
E•~TIN:; G>S US[
EXSl1N~ O,S:~>tEAO PO\\,;S CISE
Fx•SilNG US)ffl('.a(>,)NU 1Cc<.l'SOS[
£,:srn,~ IJN'.'E~C.SC<.,ND >Q'McP.
lXISll~~ ~'Al[R UN£
£>:IST·NG CYCLCS~ n.,.c, UN£
E<ISIINC PRCH:"r, UNO
PO""' PCL.E W/ LC~ NA.Rf
C<'S"11'C SlC_.,
rus~~G G,UY •N:,ICR
EXIS~r<G s-ar,-ll01T
E;,S-INU (AfC>< ~AON
w:cT~:CA, M,
CjfNC>WA~S
OISTM<~ IEcC~HONE ,.,r<SOCS
rn,,,,.c s·oiar. tRAJN Ymems
f.<IS-l'IG FIS[ HrGRSIJl
rnsr,><; owo,,cus rnrr,r.s.:
RCO~R/:AP YAR<EC ·ss.JC.J( ,,,.~-
'"~TIN(, suorACc ~·:),,,U~[NT
'"STING ~csu~(W " CASE
C<C"~ CCHN':T[
$?OJ ,,r,nos
r ----__, "----
;cO
):ti::=:01,-,-, 7l!J!l;}Jtrw,. · -=+-/ . ----' i~-·~~
_,__..;-~;;_...,..·--
LEGEND:
1438.251 Sf'OT ELEVATION
-444 · -KK5l
CONTOURS
OITCK LINE
GRAVEL ACCESS RCAO
ASPKAL T
CLEARING LIMITS/HJGII VISIB[L!TY FF:NCE
SILT FENCE
REFERENCE DRAWINGS
D-!BDO SITE LHDUT AND GENERAL NOTES
C-18734 GRADING AND FENCING PLAN
C-18736 DRAINAGE PLAN
D-18737
0-1 B738
FOicNDA Tl ON PL AN
STRUCTURAL PLAN
6
/-----~ Di St-
..--.----_.,,----',?'::,Gf-·@· CALL BEFORE
"-YOU DIG
!fl Cal I: TOLL FREE
. 1-800-424-5555
]C 0 "'-"" ..,/
''° I
30 eo
! -=---i
GRAPHIC SCALE
1' ~ 30'
~=-=--=---r====,,----,----------,-.,-----:-:-c:----::--+' REVISION DESCRIPTION: WD NU .. BER: 1 \ 1022315 TEMPORARY EROS I ON/SEO I MENT
'""IT scsrnm CONTROL PLAN-ACCESS ROAD
TALBOT HILL SUBSTATION
DATE (M/0/Yl +~ SUBSTATION DR~'il!NG ND rE~NO c,o
---
, ' ENGINEERING D-18732 ENERGY DEPARTMENT ENG [NEER c.x.,.,~/1 ;, II~ I/;_ SHEET: ' ~ ' REV[EWED ' ' SCALE:1" = 30' CLASS: SJ TE ~ APPROVED J, f.lE•IR_v /I _!__ /.:;" I /(;, CAOD MO: $$0GN~$ '
" w
" .:
w
<
~
STANDl<RD STRENGT~
rlL TER FABRIC GRATE
1wnfn~ ......... £.,, MAl_NTEf_iANCE_ STt,,_NDARDS P<ll'TIHYL.(NE CAP Pl«JVIIJI': .o.:JEOUKE
Sil'.APPING =1 11 Ill= =II II~ =1·
111=-=I I Ill= =1,1
~,, .. , .. 1 !Ii=
1=11
0111= .1-=!1
'rill/\
lll= ,Jin~
FILTER FABRIC PROTECTION
NOTE.: DNL Y TO BE USU WHERE
PONDING OF WI\TER ABOVE THE
CATCH OAS!N WILL NOT CAUSE
TRAFF !C PROE!LEt..15 AND w·~ERE
OVf.RFLOW WlLL NOT RESULT IN
ERClS tnN OF SLOPES.
-CATCH BASIN L GRATE
CTTJJ)TUTQTII I IIDUO(JO.-----T~fl I~ ---~11=11
r IL TER r.lfD!A
FOR O[WAr~HJNG
POR::JUS
BOTTOM
CATCH BASIN INSERT
NOTE: THIS OETA!L JS ONLY
SCHEMATIC. ANY INSEflT IS
ALLOWCO THAT tlAS A MJN.
0.5 C.F. OF STORAGE, THE
MEAl>iS TO DEWATER THE STORED
SEDIMENT, AN OVERFLOW, AND
CAN BE EASILY MA]NTA!NED,
1
'=111=. 1::::11
=11i=
'=II =111= ,Jffig
ANY ACCUMULATED SEDIMENT ON OR AROUND THE F L TFR
FABRIC SHALL BE REMOVED IMMEO[hTELY. SEDlM NT
S!IALL I\QT BE RD.IOV[D WITH WATER, ANO All SE lf'1ENT
MUST BE DISPOSED OF AS FILL m,-Sll!:. DR HAUL D OFF-SITF.
2. ANY SEDIMENT IN THE" CATCH 3ASIN INSERT SHALL BE
REMOVED WHE~ THE SEDIMENT HAS FILLED ONE THIRD DF
THE AVAILl,BLE STORAGE. TH!:. FILTER M!:.D IA FOR THE INSERT
SHALL BE CLEANEC OR R.:'.PLACF.0 AT LEAST MONTHLY.
3. RE::;ULAR MAHHENANCE IS CRITICAL FOR [llJld f.ORMS oc-CATCH
BASIN PROTECTIO!';. UNLIKE MANY FORMS OF PROTFt.TltlN THAT
FAIL GRADUALLY, CATCH BAS1N PROTE.Cf!ON WILL FAIL
SUDDENLY ANO COMPLETELY (F NOT MAlNTAINrn PROPERLY.
FILTER FABRIC SKfRT
SfCl;RHl WITH GRATC:\
COLLECTED
SEDIMENT
CATCH BASIN
GRATE
R[TRIEVA_ sm,1r
OVERFLOW
AL TERNA TE
CATCH BASIN INSERT
CATCH BASIN
SEDIMENT CONTROL
FOR 1/,,STALLATION. SEE TECHNIQUES FOR
TEWORARY EROS:ON AND SEDCMENT CONTROL,
PSE STANDARD 0150.3200
NTS
GXD DETAIL
'2
DESIGN AND INSTAL.LAT!ON SPECIFICATIONS
1, THE" GEOTEXTILE USED I.IUST MEET THE STANDARDS L:STEO BELOW.
A COPY 0'" THE I.IANUFACTURER'S .'"ABRIC SPECIFICATIONS
MUST B[ Al,"AICABLE ON SITE.
AO<, ( ASTM 0· 4751) 30-100 SIEVE SIZE (C· 60-0.15 rrrnl FOR SLIT Fl~M
50-100 SIEVE SIZE IC 30-.J.15 rrrnl FOR CTHER FABRICS
0.02 SEC\ MIN.
PERFOW..TD POLTE!lfnENE
ORAl"'-GE n.Ell>IG. OIA>.lf:JO!
iotlN. 2· LA'lGER li-W4
OC'IIATEfllNG Ollf"ICE.
TIJEIN(J SH/IU OOUPLY
WrTh ASThl ,~~7 J,ll[l
M.SHTO M294.
WATER PERI.IITTIV!TY IASTM 0-4491 l
GRAB TENS!LE STRENGTl-l (ASTM 0-46321 180 LBS MIN. fOR DHiA STRENGTH FABR!C
100 LBS "1JN. fOR STAf.OARO STRENGIH ~A!:l~IC
JOINTS IN FILTER FABRIC SHALL BE SPLICEC
AT POSTS. USE STAPLES, WIRE RINGS, OR
EQUIVALENT TO ATTACH FABRIC TO POSTS.
GRAB TENS lLE ELDNGAT ION { ASTI.I 0-4632 l
ULTRAVIOLET Ri':SISTANCE lASTI.I D-435S)
30'1. MAX.
70'!.. MIN.
2-STANDARD STRENGTH FABRIC RE~U!RES WIRE SACKING TO INCREASE THE STRENGTH OF THE F[NC[.
WIRE BACKING OR CLOSER POST SPACING MAY BE REOUIRC:O FDR EXTRA STRENGTH FABRIC
IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE.
3. WHERE Tl-<E FE!>ICE IS INSTAil ED, THE SIOPE SHALL 3E NO STEEPER T~AN 2Ho1\/.
mn=
CORRUGAHO I.ICTAI.. fllSE:R I
-=-:~~
ta" l,IN
L __ ~.f~~-_r--
l_ I CONCRETE BASE
I---1): RISER alA. Ml~. ----j
J.~· MIN.
C~'WAlclllr.lG ORIFlCE, 5':KEOLJL.:
~" STEEL sn.rn Mfj
DW.IDm J.S Pm c:ALCUL>:10NS
ALTrnt-lATMl.Y. MCTAL STAJ<.:s
A,~D WIRE MAY BE US£[] TO
PREVENT FLOTATION
SEDIMENT POND
RISER DETAIL EB
:S'i'il~~ ~""'' ~t """
----1.------.-. =".,_ • .,. " Ml~ ~~~E~T~~~Hg~ ~ -' _-:-:-:-:-=-1--=--'J =m oa c=, -"'" ~I~, I ~~ _-:-:-:-:-:-:-:-_::-. NOT B[ L5Ell. -~-=~\
CONCRCTE 11,!,51'
(SU: RISER OETAJL)
111:iCl<M\.E TO STABII.JilD
co~~EfMJCC. OUTLG OR
LE'IFJ. SPRO.DER
SEDIMENT POND~
SECTION ~
2"x2" BY 14 GA w:RE OR
ECUIVALENT. IF s-:-AN)A~O
STRENGTH FABRIC USED.
F. ILTER
FABRIC
z ,
'n-~m*1]
-7 Li )" u\---------,.:"::',:, ~",',:~",__/ I
P:JST 5PACiNG llAY BE WITH NATlVE SOIL OR
MAINTENANCE STANDARDS
1. ANv DAMAGE SHA~L BE REPAIRED lt.iMEO!ATEL Y
2. lF CONCENTRATED FLOWS ARE ~VIDENT UPHILL OF THE FE~CE, T~EY MUST BE INTERCEPTED ANO
CONVEYED TO A SEOEMENT TRAP DR PONC.
3. 1T JS IMPORTANT TO CHECK TrlE UPHILL SJOE OF T~!:. FENCE FDR SIG,~S OF THE FC.NCE CLOGGING
AND ACTING AS A BARRIER TO rLOW ANO ltl[N CAUSING CHANNELIZATION OF FLOWS PARALLEL TO
THE FENCE. IF THIS OCCURS, REPLACE THE FENCE ANO/OR REMOVE T~.E TRAPPED SE:OIMENT.
4. SEDII.IENT l,lJST BE REMOVED WHEN IT iS b" HIGH.
5. IF THE FILTER FABRIC ~AS DETERIORATED DUE TO THE UL TRAV!OLET BREAKOOWf.:. IT SH/\LL BE
REPLACED.
1Nr.r1[ASFO TO 8 IF WIRE ~,," 1 5' WASHED GRAVEL
BACK !NG !S US~D
NOTE: FILTER FABRIC FENCES
SHALL BC l~STALLEO ALONG
C'.INTOUR WHEN('l(A POS<,JBLE
2"x~ ·~ooc POSTS-STEEL FENCE
POSTS. REBAR. OR Eou:VALrnT
SILT FENCE DESIGN AND INSTALLATION SPECIFICATIONS
AND MAINTENANCE STANDARDS
DETAIL GXD '2
! -, --';;~"
HIGH DENSITY POLYETHYLENE OR
POLYPROPYLENE MESH, ANO SHALL
BE UV RESISTANT, ORANGE COLOR
ELEVATION
FC:NCE ON SLOPE =
'4 ELEVATION
POST SH/I.LL HAVE SUFFICIENT STRENGTH ANO DURABILITY
TO SUPPORT THE FENCE THROUGH THE LIFE OF THE PROJECT.
2x2 WOOD POS"7"
STAPLE TOP TIE
SELF-LOCKING TIE NYLON
6/6 IM!N. GRADE).
50# I.IJN. 7ENS TLE STRENGTH,
UV STABILIZED.
STEEL T-BAH POST
SELF-LOCK I NG TIE
FENCING
I.IA TEA JAL ', FENCING -
MATERIAL
/
NYLON 6/6 ( l.l!N. GRADE I,
SO# I.IJN. TENSl!..E STRENGTH,
/
( ' ~ ii
\ ~~~\Ii ' '
' \
\
I
I
I
I
/
I
I
I
I
\
\
'
-];-' ;:., )-' -"
~-----,,i"-__ /'-
( ~ \
/ [
' ' '-"!.:..'..I_........-
/
1 '-0" M[N.
<DEEPER FOR
0
'
\ I ' / ' /
2' -0"
!DESIRABLE)
UNSTABLE SOIL I~----
2x2 WOOD OR
......_ UV STABILIZED
' \
I
/
//
\
I
I
I
ENV I RONr.tENTALL Y
SENSITIVE AREA
BOUNDARY
STEEL T-BAR POST
HIGH
TYPICAL SECTION A
VISIBILITY FENCE DETAIL ED]) '2
'@, CALL BEFORE
~ YOU DIG
Co 11 : TOLL FREE
, 1-B00-424-5555
"
s
~,="~"~'°"~"~"~'"~'"~"'~"'~~~"=""="'="~"~"~22~'~"-~T=E=M=P=o=R=A=R=Y~E~R~O~S~I~o=N=/s=E=D=IM=E=N=T~c=o=N=T=R=O~L-,--,
J. NelsoY\
C.,C:c15z I
""""
NOTES AND DETAILS
TALBOT HILL SUBSTATION
DATE !M/0/Y)
10 I IOI /Ye_
Jg lg!, 1/6 • SC~LE I NONE
PUGET
SOUND
ENERGY
jj____!_,__'i_l/tp l:•oo NO: 110GN0
SUBSTATION
ENGINEERING
DEPARWENT
CL~Ss: SITE
Of/AWING NU Rl¥ NU
0
This page intentionally left blank.
Appendix G
Facilities Summary and
Declaration of Covenant
2009 Surface Water Design Manual
KING COUNTY, WASIIII\GTON, SURFACE WATER DESIGN MA'JUAL
KING COUNTY, WASHINGTON
SURFACE WATER DESIGN MANUAL
REFERENCE 8-D
FLOW CONTROL AND WATER
QUALITY FACILITY SUMMARY SHEET
AND SKETCH
1/9/2009
KTI\G COUNTY, WASHINGTON, SURFACE WATER DESIGN MAI\CAL
STORMW ATER FACILITY SUMMARY SHEET DOES Permit
Number 1 -~-------
(provide one Stormwater Facility Summary Sheet per Natural Discharge Location)
Overview:
Project Name
_T_a_lb_o_t_S_u_b_s_ta_t_io_n_S_to_r_m_w_a_t_e_r _S_u~p~p_o_rt _________ Date September 28, 2016
Downstream Drainage Basins
Major Basin NameD __ u_w_a_m~is_h---,----R_i_v~e_r _~~~---,------
Immediate Basin Name Project Area Subbasin
Flow Control:
Flow Control Facility Name/Number Stormwater Detention Pond ---------------
Facility
Location Southeastern corner of Talbot Substation ----------------------------------
If none,
Flow control provided in regional/shared facility (give
location) ____ ---,----__________ _
No flow control required Exemption number
General Facility Information:
Type/Number of detention facilities: Type/Number of infiltration facilities:
__ 1_ponds ponds
vaults tanks ---
tanks trenches ------
Control Structure Location
Control structure located on southern side of detention pond.
Type of Control Structure 12 inch diameter riser structure Number of Orifices/Restrictions
3
Size of Orifice/Restriction: No. I 1. 15 inches
No. 2 2. 13 inches ~~~==~--
No. 3 _2_.0_0_i_nc_h_e_s __
No. 4 ______ _
Flow Control Performance Standard Match forested condition for flows from 50%
of the 2 year up to 100% of the 50-year
2009 Surface Water Design Manual
1
11912009
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
Live Storage Volume 73,876 Cubic Feet Depth 7.0 Ft (effect. storage)Volume Factor of Safety
Number of Acres Served 5.89 acres
Number of Lots 1 ----------
Dam Safety Regulations (Washington State Department of Ecology)
Reservoir Volume above natural grade 73,876 above excavated grade. 27,124 above natural grade.
Depth of Reservoir above natural grade 7.5 above excavated grade. 2.5 above natural grade.
Facility Summary Sheet Sketch
All detention, infiltration and water quality facilities must include a detailed sketch.
(11 "xl 7" reduced size plan sheets may be used)
2009 Surface Water Design Manual
2
1/9/2009
LEGEND
L.-' ""'! Project Area ·-
•
Conto urs -
10 ft Interval
Prop o sed C ontrol
Structure
~ P ro po sed
Flow Path
5
E22l]
Prop osed
Dra i nage
Infrastructure
Proposed
Detention Pond
Pro po sed Access
Roa d
DATA SOURCE: City ex Renton,
King Courl.y (20 16)
0 Feet 150
FLOW CONTROL FACILITY SKETCH
APPENDIX G
PJITH: O ·IPROJEC TS\WASHINOTON\PUQ[T_SOOND_fiNliAQY_00101'l\TAl 801_1f0RMWA TER_IUPPOAT_?tHHWAP' _OOCSo0ft.U:T\TtR FtOURU\APPEMOIX O FACILTY SKl!TCH.MXO • USER: TA HOF FMA • DATCi: 11111/2011 STORMWA TER TIR
2009 Surface Water Design Manual Amendment
CITY OF RENTON
AMENDMENTS TO THE KING COUNTY
SURFACE WATER DESIGN MANUAL
REFERENCE 8-H
BOND QUANTITIES WORKSHEET
City of Renton
Site Improvement Bond Quantity Worksheet
Original bond computations prepared by:
Name: Date: --------------PE Registration Number: Te I.#; -----------Firm Name:
Address: Project No: _____________ _
ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND•,h
AMOUNT
PUBLIC ROAD & DRAINAGE
MAINTENANCE/DEFECT BOND*,0
Stabilization/Erosion Sediment Control (ESC) (A) $
Existing Right-of-Way Improvements (B) $
Future Public Road Improvements & Drainage Facilities (C) $
Private Improvements (D) $
Construction Bond* Amount (A+B+C+D) TOTAL (T) $
Minimum bond• amount is $1000.
(B+C) x
Maintenance/Defect Bond* Total 0.20 = _:$:___ _____ _
NAME OF PERSON PREPARING BOND" REDUCTION:
* NOTE: The word "bond" as used in this document means any financial guarantee acceptable to the City of Renton.
-NOTE: All prices include labor, equipment, materials, overhead and profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
REQUIRED BOND~ AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY RDSD
Page 1 of 1
REF 8-H BOND QUANTITY WORKSHEET.xis
Date·
LJnij prices updated: 2112102
Version: 4/22/02
Report Date: 1119/2010
Site Improvement Bond Quantity Worksheet
$
Backfill & Compaction-trench GI-2 $ 8.53 CY 0.00
Clear/Remove Brush, by hand GI -3 $ 0.36 SY 0.00 0.00
Clearing/Grubbing!Tree Removal Gl-4 $8,876 16 Acre 0.00 0.00
Excavation -bulk GI -5 $ 1.50 CY 0.00 0.00
Excavation -Trench Gl-6 $ 406 CY 0.00 0.00
Fencing, cedar, 6' high Gl-7 $ 18.55 LF 0.00 0.00
Fencing, chain link, vinyl coated, 6' high GI-B $ 13.44 LF 0.00 0.00
Fencing, chain link. gate, vinyl coated, 2 GI -9 $ 1.271.81 Each 0.00 0.00
Fencing, split rail, 3' high GI -1< $ 12.12 LF 0.00 0.00
Fill & compact -common barrow GI -11 $ 22.57 CY 0.00 0.00
Fill & compact -gravel base GI -1 $ 25.48 CY 0.00 0.00
Fill & compact -screened topsoil GI -1 $ 37.85 CY 0.00 0.00
Gabion, 12" deep, stone filled mesh GI -1 $ 54.31 SY 0.00 000
Gabion, 18" deep, stone filled mesh GI -1 $ 74.85 SY 0.00 0.00
Gabion, 36" deep, stone filled mesh GI -1 $ 132.48 SY 0.00 0.00
Grading, fine, by hand GI -1 $ 2.02 SY 0.00 0.00
Grading, fine, with grader GI -1 $ 0.95 SY 0.00 0.00
Monuments, 3' long GI -1 $ 135.13 Each 0.00 0.00
Sensitive Areas Sign GI -2 $ 2.88 Each 0.00 0.00
Sodding, 1" deep, sloped ground GI -21 $ 7.46 SY 0.00 0.00
Surveying, line & grade GI -2 $ 788.26 Day 0.00 0.00
Surveying, lot loc.ation/lines GI -2 $1,556.64 Acre 0.00 0.00
Traffic control crew ( 2 flaggers ) GI -2 $ 85.18 HR 000 0.00
Trail, 4" chipped wood GI -2 $ 7.59 SY 0.00 0.00
Trail, 4" crushed cinder Gl-2 $ 8.33 SY 0.00 0.00
Trail, 4" top course GI -2 $ 8.19 SY 0.00 0.00
Wall, retaining. concrete Gl-2 $ 44.16 SF 0.00 0.00
Wall, rockery IGl-2S $ 9.49 SF 0.00 o.oc
Page 2 of 7 SUBTOTAL 0.00 0.00 ---
REF 8-H BOND QUANTITY WORKSHEET.xis
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
000
0.00
0.00
0.00
0.00
0.00
Unit prices updated: 2/12/02
Version: 4/22102
Report Date: 111912010
Site Improvement Bond Quantity Worksheet
AC Grinding, 4' wide machine< 1000sy RI -1 $ 23.00 SY 0.00
AC Grinding, 4' wide machine 1000-2000 RI· 2 $ 5.75 SY 0.00 0.00
AC Grinding, 4' wide machine > 2000sy RI· 3 $ 1.38 SY 0.00 0.00
AC Removal/Disposal/Repair RI -4 $ 41.14 SY 0.00 0.00
Barricade, type I RI· 5 $ 3003 LF 0.00 0.00
Barricade, type 111 ( Permanent ) RI -6 $ 45.05 LF 0.00 0.00
Curb & Gutter, rolled RI -7 $ 13.27 LF 0.00 0.00
Curb & Gutter, vertical RI· 8 $ 9.69 LF 0.00 0.00
Curb and Gutter, demolition and disposal RI -9 $ 13.58 LF 0.00 0.00
Curb, extruded asphalt RI· 10 $ 2.44 LF 0.00 0.00
Curb, extruded concrete RI · 11 $ 2.56 LF 0.00 0.00
Sawcut, asphalt, 3" depth RI -1 $ 1.85 LF 0.00 ODO
Sawcut. concrete, per 1" depth RI· 13 $ 1.69 LF ODD 0.00
Sealant, asphalt RI· 14 $ 0.99 LF 0.00 0.00
Shoulder, AC, { see AC road unit price ) RI -15 $ . SY 0.00 0.00
Shoulder, gravel, 4" thick RI -1 $ 7.53 SY 0.00 0.00
Sidewalk, 4" thick RI· 1 $ 30.52 SY 0.00 0.00
Sidewalk, 4" thick, demolition and dispos RI· 1 $ 27.73 SY 0.00 0.00
Sidewalk, 5" thick RI· 19 $ 34.94 SY 0.00 0.00
Sidewalk, 5" thick, demolition and dispos RI-2 $ 34.65 SY 0.00 0.00
Sign, handicap RI· 21 $ 85.28 Each 0.00 0.00
Striping, per stall RI· 22 $ 5.82 Each 0.00 0.00
Striping, thermoplastic, ( for crosswalk ) RI· 23 $ 2.38 SF 0.00 0.00
~tnping, 4" renectorized 11ne 1,1 -L4 • 0.25 LF 0.00 O.<><
Page 3 of 7 SUBTOTAL 0.00 0.00
REF 8-H BOND QUANTITY WORKSHEET.xis
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
000
0.00
0.00
0.00
0.00
0.00
Unit prices updated: 2/12/02
Version: 4122/02
Report Date: 1/19/2010
Site Improvement Bond Quantity Worksheet
$ 3.60 SY 0()0 0.00
AC Overlay, 1.5" AC RS-2 $ 7.39 SY 0.00 0.00
AC Overlay, 2'' AC RS-3 $ 8.75 SY 0.00 0.00
AC Road, 2", 4" rock, First 2500 SY RS-4 $ 17.24 SY 0.00 0.00
AC Road, 2", 4" rock, Qty. over 2500SY RS-5 $ 13.36 SY 0.00 0.00
AC Road, 3", 4" rock, First 2500 SY RS-6 $ 19.69 SY 0.00 0.00
AC Road, 3", 4" rock, Qty. over 2500 SY RS-7 $ 15.81 SY 0.00 0.00
AC Road, 5", First 2500 SY RS -8 $ 14.57 SY 0.00 0.00
AC Road, 5", Qty. Over 2500 SY RS -9 $ 13.94 SY 0.00 0.00
AC Road, 6", First 2500 SY ,s-1 $ 16.76 SY 0.00 0.00
AC Road, 6", Qty. Over 2500 SY as -1 $ 16.12 SY 0.00 0.00
Asphalt Treated Base. 4" thick SS-1 $ 9.21 SY 0.00 0.00
Gravel Road, 4" rock, First 2500 SY S -1 $ 11.41 SY 0.00 0.00
Gravel Road, 4" rack, Qty. over 2500 SY S -1 $ 7.53 SY 0.00 0.00
PCC Road, 5", no base, over 2500 SY S -1 $ 21.51 SY 0.00 0.00
PCC Road, 6'', no base, over 2500 SY as-1 $ 21.87 SY 0.00 0.00
1 r 11cKened n 1ge
Page4 of7 SUBTOTAL 0.00 0.00
REF 8-H BOND QUANTITY WORKSHEET.xis
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
000
0.00
0.00
000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Unit prices updated: 2/12/02
Version: 4/22/02
Report Date: 1/19/2010
Site Improvement Bond Quantity Worksheet
Bollards -removable I 0-3 I $ 452.34 I Each I I 0.001 I 0.001 I
* (CBs include frame and lid)
CB Type I 0-4 $1,25764 Each 0.00 0.00
CB Type IL 0-5 $1,433.59 Each 0.00 0.00
CB Type ll, 48" diameter 0-6 $2,033 57 Each 0.00 0.00
for additional depth over 4' 0-7 $ 43652 FT 0.00 0.00
CB Type II, 54" diameter 0 -8 $2,192.54 Each 0.00 0.00
for additional depth over 4' 0 -9 $ 486.53 FT 0.00 0.00
CB Type H, 60" diameter D -10 $2,351.52 Each 0.00 0.00
for additional depth over 4' 0 -11 $ 53654 FT 0.00 0.00
CB Type II, 72" diameter 0 -12 $3,212.54 Each 0.00 0.00
for additional depth over 4' 0 -13 $ 692.21 FT 0.00 0.00
Through-curb Inlet Framework {Add) 0 -14 $ 366.09 Each 0.00 0.00
Cleanout, PVC, 4" D -15 $ 130.55 Each 0.00 0.00
Cleanout, PVC, 6" 0-16 $ 174.90 Each 0.00 0.00
Cleanout, PVC, 8" 0-17 $ 224.19 Each 0.00 0.00
Culvert, PVC, 4" D-18 $ 8.64 LF 0.00 0.00
Culvert, PVC, 6" 0 -19 $ 12.60 LF 0.00 0.00
Culvert, PVC, 8" 0-20 $ 13.33 LF 0.00 0.00
Culvert, PVC, 12" 0-21 $ 21.77 LF 0.00 0.00
Culvert, CMP, 8" 0-22 $ 17.25 LF 0.00 0.00
Culvert, CMP, 12" D-23 $ 26.45 LF 0.00 0.00
Culvert, CMP, 15" 0-24 $ 32.73 LF 0.00 0.00
Culvert, CMP, 18" 0-25 $ 37.74 LF 0.00 0.00
Culvert, CMP, 24" D-26 $ 53.33 LF 0.00 0.00
Culvert, CMP, 30" D-27 $ 71.45 LF 0.00 0.00
Culvert, CMP, 36" D-28 $ 112.11 LF 0.00 0.00
Culvert, CMP, 48" 0-29 $ 140.83 LF 0.00 0.00
Culvert, CMP, 50" D-30 $ 235.45 LF 0.00 0.00
rt, v1v1r· , 1 £ LJ -" :ti .:>V£.5ts Le U.u, U.
Page 5 of 7 SUBTOTAL 0.00 0.00
REF 8-H BOND QUANTITY WORKSHEET.xis
0001 I 0.00
-.. .... 0.00 -0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ODO
0.00
0.00
ODO
0.00
0.00 ---------
Unit prices updated: 2/12/02
Version: 4/22/02
Report Date: 1/19/2010
Site Improvement Bond Quantity Worksheet
$ 30.05 LF 0 0
0-34 $ 37.34 LF 0 0
Culvert, Concrete, 18" 0-35 $ 44.51 LF 0 0
Culvert, Concrete, 24" 0-36 $ 61.07 LF 0 0
Culvert, Concrete, 30" 0-37 $ 104.18 LF 0 0
Culvert, Concrete, 36" 0-38 $ 137.63 LF 0 0
Culvert. Concrete, 42" 0-39 $ 158.42 LF 0 0
Culvert, Concrete, 48" D-40 $ 175.94 LF 0 0
Culvert, CPP, 6" 0-41 $ 10.70 LF 0 0
Culvert, CPP, 8" 0-42 $ 16.10 LF 0 0
Culvert, CPP, 12" D-43 $ 20.70 LF 0 0
Culvert, CPP, 15" 0-44 $ 23.00 LF 0 0
Culvert, CPP, 18" D-45 $ 27.60 LF 0 0
Culvert, CPP, 24" D-46 $ 36.80 LF 0 0
Culvert, CPP, 30" 0-47 $ 48.30 LF 0 0
Culvert, CPP, 36" 0-48 $ 55.20 LF 0 0
Ditching 0-49 $ 8.08 CY 0 0
Flow Dispersal Trench (1,436 base+) 0-50 $ 25.99 LF
French Drain (3' depth) 0-51 $ 22.60 LF 0 0
Geotextile, laid in trench, polypropylene 0-52 $ 2.40 SY 0 0
Infiltration pond testing 0-53 $ 74.75 HR 0 0
Mid-tank Access Riser, 48" dia, 6' deep D -54 $1,605.40 Each 0 0
Pond Overflow Spillway 0 -55 $ 14.01 SY 0 0
Restrictor/Oil Separator, 12" 0-56 $1,045.19 Each 0 0
Restrictor/Oil Separator, 15" 0-57 $1,095.56 Each 0 0
Restrictor/Oil Separator, 18" 0-58 $1,146.16 Each 0 0
Riprap, placed D-59 $ 3908 CY 0 0
Tank End Reducer (36" diameter) 0-60 $1,000.50 Each 0 0
(Trash Rack, 12" D-61 $ 211.97 Each 0 0
0-62 $ 237.27 Each 0 0
$ 268.89 Each 0 0
I rasn K8CK, Ll I u -041 :l) .>U<.i.ti4 cau ' (
Page 6 of7 SUBTOTAL 0 0
REF 8-H BOND QUANTITY WORKSHEET.xis
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
'
0
lJ
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
l
0
Unit prices updated: 2/12/02
Version: 4/22/02
Report Date: 111912010
Site Improvement Bond Quantity Worksheet
No.
2" AC, 2'' top course rock & 4" borrow PL-1-$ 15.84 SY 0 0
2" AC, 1.5" top course & 2.5" base cour PL-2 $ 17.24 SY 0 0
4" select borrow PL-3 $ 4.55 SY 0 0
1.5" top course rock & 2.5" base course PL-4 $ 11.41 SY 0 0
l(Such as detention/water quality vaults.) No.
W1 -1 Each 0 0.00
W1. 2 SY 0 0.00
W1. 3 CY 0 0.00
Wl-4 LF 0 0.00
W1. 5 FT 0 0.00
W1. 6 0 0.00
W1. 7 0 0.00
W1. 8 0 0.00
W1. 9 0 0.00
WI -10 \ o.uo
SUBTOTAL 0.00 0.00
SUBTOTAL (SUM ALL PAGES): 0.00 0.00
30% CONTINGENCY & MOBILIZATION: 0.00 0.00
GRANDTOTAL: 0.00 0 00
COLUMN: B C
Page 7 of 7
REF 8-H BONO QUANTITY WORKSHEET.xis
0
0
0
0
0.00
0.00
0.00
0.00
000
0.00
0.00
0.00
0.00
U.v
0.00
0.00
0.00
0.00
D
0
0
0
0
.. -;,._,,:-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
E
Unit prices updated: 2/12/02
Version: 4/22/02
Report Date: 1/19/2010
This page intentionally left blank.
Appendix H
Operations and Maintenance
Manual
The following manual includes a brief description of each facility and component requiring
periodic maintenance at the project area. It also details the recommended frequency of
maintenance activities and refers to the Maintenance Requirements for Flow Control,
Conveyance, and WQ Facilities.
Facility Description Recommended Frequency of
Maintenance
Detention The proposed stormwater Perform maintenance tasks listed in
Pond detention pond is located along No. 1 -Detention Ponds of the
the southeastern corner of the Maintenance Requirements for Flow
substation. It is used to control Control, Conveyance, and WQ
flow rates exiting the proposed Facilities after significant storm events.
facility and prevent
downstream erosion.
Control Control structures are placed Perform maintenance tasks listed in
Structure within or adjacent to No. 4 -Control Structure I Flow
stormwater detention ponds Restrictor of the Maintenance
and are the facilities which Requirements for Flow Control,
restrict runoff from exiting the Conveyance, and WQ Facilities after
stormwater detention oond. sianificant storm events.
Conveyance Conveyance pipes are placed Perform maintenance tasks listed in
Pipes within the substation and are No. 6 -Conveyance Pipes and Ditches
used to convey water to the of the Maintenance Requirements for
proposed stormwater detention Flow Control, Conveyance, and WQ
nond. Facilities after sianificant storm events.
Debris A debris barrier is placed within Perform maintenance tasks listed in
Barriers the stormwater detention pond No. 7 -Debris Barries of the
at the inlet to the control Maintenance Requirements for Flow
structure. This prevents trash Control, Conveyance, and WQ
and other foreign objects from Facilities after significant storm events.
entering the structure and
damaaina or blockina it.
Fencing Fencing is placed around the Perform maintenance tasks listed in
perimeter of the stormwater No. 9 -Fencing of the Maintenance
detention pond and substation Requirements for Flow Control,
to prevent unauthorized Conveyance, and WQ Facilities during
individuals from entering the all site visits.
facilities.
Access An access road along the Perform maintenance tasks listed in
Roads southern side of the substation No. 12 -Access Roads of the
is used to gain vehicle access Maintenance Requirements for Flow
to the site. Control, Conveyance, and WQ
Facilities after sianificant storm events.
KING COUNTY, WASHINGTON, SURFACE WATER lJESICi'i MANUAL
KING COUNTY, WASHINGTON
SURFACE WATER DESIGN MANUAL
APPENDIX A
MAINTENANCE REQUIREMENTS FOR
FLOW CONTROL, CONVEYANCE AND
WQ FACILITIES
1/9/2009
KING COUNTY, WASHINGTON. SURFACE WATER DESIGN MAI\CAL
APPENDIX A
MAINTENANCE REQUIREMENTS FOR FLOW
CONTROL, CONVEYANCE, AND WQ FACILITIES
Relevant facilities and components have been outlined in red.
This appendix contains the maintenance requirements for the following typical stormwater control
facilities and components:
I No. 1 -Detention Ponds (p. A-2) I
No. 2 -Infiltration Facilities (p. A-3)
No. 3 -Detention Tanks and Vaults (p. A-5)
I No. 4 -Control Structure!Flow Restrictor (p. A-7)!
No. 5 -Catch Basins and Manholes (p. A-9)
No. 6-Conveyance Pipes and Ditches (p. A-11)
No. 7 -Debris Barriers (e.g., Trash Racks) (p. A-12)
No. 8 -Energy Dissipaters (p. A-13)
!No. 9-Fencing (p. A-14)!
No. IO -Gates/Bollards/ Access Barriers (p. A-15)
No. 11 -Grounds (Landscaping) (p. A-16)
!No. 12-Access Roads (p. A-17)!
No. 13 -Basic Biofiltration Swale (grass) (p. A-18)
No. 14-Wet Biofiltration Swale (p. A-19)
No. 15 -Filter Strip (p. A-20)
No. 16-Wetpond (p. A-21)
No. 17 -Wetvault (p. A-23)
No. 18 -Stormwater Wetland (p. A-24)
No. 19 -Sand Filter Pond (p. A-26)
No. 20 -Sand Filter Vault (p. A-28)
No. 21 -Stormfilter (Cartridge Type) (p. A-30)
No. 22 -Baffle Oil/Water Separator (p. A-32)
No. 23 -Coalescing Plate Oil/Water Separator (p. A-33)
No. 24 -Catch Basin Insert (p. A-35)
2009 Surface Water Design Manual-Appendix A
A-1
11912009
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ fACILITIES
-
NO. 1 -DETENTION PONDS
Maintenance Defect or Problem Conditions When Maintenance Is Needed Results Expected When
Component Maintenance Is Performed
Site Trash and debris Any trash and debris which exceed 1 cubic foot Trash and debris cleared from site.
per 1,000 square feet (this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a
height. height no greater than 6 inches.
Top or Side Slopes Rodent holes Any evidence of rodent holes if facility is acting Rodents removed or destroyed and
of Dam, Berm or as a dam or berm, or any evidence of water dam or berm repaired.
Embankment piping through dam or berm via rodent holes.
Tree growth Tree growth threatens integrity of slopes, does Trees do not hinder facility
not allow maintenance access, or interferes with performance or maintenance
maintenance activity. If trees are not a threat or activities.
not interfering with access or maintenance, they
do not need to be removed.
Erosion Eroded damage over 2 inches deep where cause Slopes stabilized using appropriate
of damage is still present or where there is erosion control measures. If erosion
potential for continued erosion. Any erosion is occurring on compacted slope, a
observed on a compacted slope. licensed civil engineer should be
consulted to resolve source of
erosion.
Settlement Any part of a dam, berm or embankment that has Top or side slope restored to design
settled 4 inches lower than the design elevation. dimensions. If settlement is
significant, a licensed civil engineer
should be consulted to determine
the cause of the settlement.
Storage Area Sediment Accumulated sediment that exceeds 10% of the Sediment cleaned out to designed
accumulation designed pond depth. pond shape and depth; pond
reseeded if necessary to control
erosion.
Liner damaged Liner is visible or pond does not hold water as Liner repaired or replaced.
(If Applicable) designed.
Inlet/Outlet Pipe. Sediment Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged Cracks wider than %-inch at the joint of the No cracks more than X-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
Emergency Tree growth Tree growth impedes flow or threatens stability of Trees removed.
Overflow/Spillway spillway.
Rock missing Only one layer of rock exists above native soil in Spillway restored to design
area five square feet or larger or any exposure of standards.
native soil on the spillway.
1/9/2009 2009 Surface Water Design Manual -Appendix A
A-2
APPENDIX A MAl!sTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIP.S
----
NO. 2-INFILTRATION FACILITIES
Maintenance Defect or Problem Conditions When Maintenance Is Needed Results Expected When
Component Maintenance Is Performed
Site Trash and debris Any trash and debris which exceed 1 cubic foot Trash and debris cleared from site.
per 1,000 square feet (this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other lhan a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a
height. height no greater than 6 inches.
Infiltration Pond, Top Rodent holes Any evidence of rodent holes if facility is acting Rodents removed or destroyed and
or Side Slopes of as a dam or berm, or any evidence of water dam or berm repaired.
Dam, Berm or piping through dam or berm via rodent holes.
Embankment
Tree growth Tree growth threatens integrity of dams, berms or Trees do not hinder facility
slopes, does not allow maintenance access, or performance or maintenance
interferes with maintenance activity. If trees are activities.
not a threat to dam, berm, or embankment
integrity or not interfering with access or
maintenance, they do not need to be removed.
Erosion Eroded damage over 2 inches deep where cause Slopes stabilized using appropriate
of damage is still present or where there is erosion control measures. If erosion
potential for continued erosion. Any erosion is occurring on compacted slope, a
observed on a compacted slope. licensed civil engineer should be
consulted to resolve source of
erosion.
Settlement Any part of a dam, berm or embankment that has Top or side slope restored to design
settled 4 inches lower than the design elevation. dimensions. If settlement is
significant, a licensed civil engineer
should be consulted to determine
the cause of the settlement.
Infiltration Pond, Sediment If two inches or more sediment is present or a Facility infiltrates as designed.
Tank, Vault, Trench, accumulation percolation test indicates facility is working at or
or Small Basin less than 90% of design.
Storage Area
Infiltration Tank Plugged air vent Any blockage of the vent. Tank or vault freely vents.
Structure
Tank bent out of Any part of tank/pipe is bent out of shape more Tank repaired or replaced to design.
shape than 10% of its design shape.
Gaps between A gap wider than 1h-inch at the joint of any tank No water or soil entering tank
sections, damaged sections or any evidence of soil particles entering through joints or walls.
joints or cracks or the tank at a joint or through a wall.
tears in wall
Infiltration Vault Damage to wall, Cracks wider than X-inch, any evidence of soil Vault is sealed and structurally
Structure frame, botlom, and/or entering the structure through cracks or qualified sound.
top slab inspection personnel determines that the vault is
not structurally sound.
2009 Surface Water Design Manual-Appendix A 1/9/2009
A-3
Al'l'ENlJlX A MAll\TENANCE REQlllREMEI\TS Fl.OW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 2 -INFILTRATION FACILITIES
Maintenance Defect or Problem Conditions When Maintenance Is Needed Results Expected When
Component Maintenance Is Performed
Inlet/Outlet Pipes Sediment Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged Cracks wider than %-inch at the joint of the No cracks more than X-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
al the joints of the inlet/outlet pipes.
Access Manhole Cover/lid not in place Cover/lid is missing or only partially in place. Manhole access covered.
Any open manhole requires immediate
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
not working maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and
remove cover/lid after applying 80 lbs of lift. reinstalled by one maintenance
person.
Ladder rungs unsafe Missing rungs, misalignment, rust, or cracks. Ladder meets design standards.
Allows maintenance person safe
access.
Large access Damaged or difficult Large access doors or plates cannot be Replace or repair access door so it
doors/plate to open opened/removed using normal equipment. can opened as designed.
Gaps, doesn't cover Large access doors not flat and/or access Doors close flat and covers access
completely opening not completely covered. opening completely.
Lifting Rings missing, Lifting rings not capable of lifting weight of door Lifting rings sufficient to lift or
rusted or plate. remove door or plate.
Infiltration Pond, Plugged Filter bag more than 1/2 full. Replace filter bag or redesign
Tank, Vault, Trench, system.
or Small Basin Filter
Bags
Infiltration Pond, Sediment 6" or more of sediment has accumulated. Pre-settling occurs as designed
Tank, Vault, Trench, accumulation
or Small Basin Pre-
settling Ponds and
Vaults
Infiltration Pond, Plugged High water level on upstream side of filter Rock filter replaced evaluate need
Rock Filter remains for extended period of time or little or no for fitter and remove if not
water flows through filter during heavy rain necessary.
storms.
Infiltration Pond Rock missing Only one layer of rock exists above native soil in Spillway restored to design
Emergency Overflow area five square feet or larger, or any exposure of standards.
Spillway native soil at the top of out flow path of spillway.
Rip-rap on inside slopes need not be replaced.
Tree growth Tree growth impedes flow or threatens stability of Trees removed.
spillway.
119/2009 2009 Surface Water Design Manual -Appendix A
A-4
Al'l'ENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, Al\D WQ FACILITIES
·--·-
NO. 3-DETENTION TANKS AND VAULTS
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash and debris Any trash and debris which exceed 1 cubic foot Trash and debris cleared from site.
per 1,000 square feet (this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline. concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a
height. height no greater lhan 6 inches.
Tank or Vault Trash and debris Any trash and debris accumulated in vault or tank No trash or debris in vaull.
Storage Area (includes floatables and non-floatables).
Sediment Accumulated sediment depth exceeds 10% of the All sediment removed from storage
accumulation diameter of the storage area for% length of area.
storage vault or any point depth exceeds 15% of
diameter. Example: 72-inch storage tank would
require cleaning when sediment reaches depth of
7 inches for more than % length of tank.
Tank Structure Plugged air vent Any blockage of the vent. Tank or vault freely vents.
Tank bent out of Any part of tank/pipe is bent out of shape more Tank repaired or replaced to design.
shape than 10% of its design shape.
Gaps between A gap wider than %-inch at the joint of any tank No water or soil entering tank
sections, damaged sections or any evidence of soil particles entering through joints or walls.
joints or cracks or the tank at a joint or through a wall.
tears in wall
Vault Structure Damage to wall, Cracks wider than %-inch, any evidence of soil Vault is sealed and structurally
frame, boltom, and/or entering the structure through cracks or qualified sound.
top slab inspection personnel detennines that the vault is
not structurally sound.
Inlet/Outlet Pipes Sediment Sediment filling 20% or more of the pipe. lnlel/outlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlel/outlet No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged Cracks wider than %-inch at the joint of the No cracks more than Xi-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inletloutlet pipe.
at the joints of the inlet/outlet pipes.
2009 Surface Water Design Manual -Appendix A 1/9/2009
A-5
APPENDIX A MAINTENANCE RE()UIREMENTS rl .OW CONTROL, CONVEYANCE, AND W() FACILITIES
NO. 3-DETENTION TANKS AND VAULTS
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Access Manhole Cover/lid not in place Cover/lid is missing or only partially in place. Manhole access covered.
Any open manhole requires immediate
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
not working maintenance person with proper tools. Bolts
cannot be sealed. Self-locking cover/lid does not
work.
Cover/lid difficull to One maintenance person cannot remove Cover/lid can be removed and
remove cover/lid after applying 80 lbs of lift. reinstalled by one maintenance
person.
Ladder rungs unsafe Missing rungs, misalignment rust, or cracks. Ladder meets design standards.
Allows maintenance person safe
access.
Large access Damaged or difficult Large access doors or plates cannot be Replace or repair access door so it
doors/plate to open opened/removed using normal equipment. can opened as designed.
Gaps, doesn't cover Large access doors not flat and/or access Doors close flat and covers access
completely opening not completely covered. opening completely.
Lifting Rings missing, Lifting rings not capable of lifting weight of door Lifting rings sufficient to lift or
rusted or plate. remove door or plate.
1/9/2009 2009 Surface Water Design Manual -Appendix A
J\-6
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL. CONVEYANCE. AND WQ FACILITIES
NO. 4-CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Structure Trash and debris Trash or debris of more than ~ cubic foot which No Trash or debris blocking or
is located immediately in front of the structure potentially blocking entrance to
opening or is blocking capacity of the structure by structure.
more than 10%.
Trash or debris in the structure that exceeds 1h No trash or debris in the structure.
the depth from the bottom of basin to invert the
lowest pipe into or out of the basin.
Deposits of garbage exceeding 1 cubic foot in No condition present which would
volume. attract or support the breeding of
insects or rodents.
Sediment Sediment exceeds 60% of the depth from the Sump of structure contains no
bottom of the structure to the invert of the lowest sediment.
pipe into or out of the structure or the bottom of
the FROP~ T section or is within 6 inches of the
invert of the lowest pipe into or out of the
structure or the bottom of the FROP-T section.
Damage to frame Corner of frame extends more than% inch past Frame is even with curb.
and/or top slab curb face into the street (If applicable).
Top slab has holes larger than 2 square inches or Top slab is free of holes and cracks.
cracks wider than X. inch.
Frame not sitting flush on top slab, i.e., Frame is sitting flush on top slab.
separation of more than Y. inch of the frame from
the top slab.
Cracks in walls or Cracks wider than % inch and longer than 3 feet, Structure is sealed and structurally
bottom any evidence of soil particles entering structure sound.
through cracks, or maintenance person judges
that structure is unsound.
Cracks wider than % inch and longer than 1 foot No cracks more than 1/4 inch wide at
at lhe joint of any inleUoutlet pipe or any evidence the joint of inleUoutlet pipe.
of soil particles entering structure through cracks.
Settlemenu Structure has settled more than 1 inch or has Basin replaced or repaired to design
misalignment rotated more than 2 inches out of alignment. standards.
Damaged pipe joints Cracks wider than %-inch at the joint of the No cracks more than X-inch wide al
inleUoutlet pipes or any evidence of soil entering the joint of inleUoutlet pipes.
the structure at the joint of the inleUoutlet pipes.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Ladder rungs missing Ladder is unsafe due to missing rungs, Ladder meets design standards and
or unsafe misalignment, rust, cracks, or sharp edges. allows maintenance person safe
access.
FROP-T Section Damage T section is not securely attached to structure T section securely attached to wall
wall and outlet pipe structure should support at and outlet pipe.
least 1,000 lbs of up or down pressure.
Structure is not in upright position (allow up to Structure in correct position.
10% from plumb).
Connections to outlet pipe are not watertight or Connections to outlet pipe are water
show signs of deteriorated grout. tight; structure repaired or replaced
and works as designed.
Any hote~ther than designed holes-in the Structure has no holes other than
structure. designed holes.
Cleanout Gate Damaged or missing Cleanout gate is missing. Replace cleanout gate.
2009 Surface Water Design Manual -Appendix A l/9/2009
A-7
APPEJ\f)JX A MAINTEl\ANCt REQUIREMENTS ELOW CONTROL, CONVEYANCE, AND WQ EACILITIES
.. ,
NO. 4 -CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Pelformed
Cleanout gate is not watertight. Gate is watertight and works as
designed.
Gate cannot be moved up and down by one Gate moves up and down easily and
maintenance person. is watertight.
Chain/rod leading to gate is missing or damaged. Chain is in place and works as
designed.
Orifice Plate Damaged or missing Control device is not working properly due to Plate is in place and works as
missing, out of place. or bent orifice plate. designed.
Obstructions Any trash, debris, sediment, or vegetation Plate is free of all obstructions and
blocking the plate. works as designed.
Overflow Pipe Obstructions Any trash or debris blocking (or having the Pipe is free of all obstructions and
potential of blocking) the overflow pipe. works as designed.
Deformed or damaged Up of overflow pipe is bent or deformed. Overflow pipe does not allow
lip overflow at an elevation lower than
design
lnleUOutlet Pipe Sediment Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged Cracks wider than Y:,-inch at the joint of the No cracks more than %-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
Metal Grates Unsafe grate opening Grate with opening wider than 7/8 inch. Grate opening meets design
(If Applicable) standards.
Trash and debris Trash and debris that is blocking more than 20% Grate free of trash and debris.
of grate surface. footnote to guidelines for disposal
Damaged or missing Grate missing or broken member(s) of the grate. Grate is in place and meets design
standards.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place. Cover/lid protects opening to
Any open structure requires urgent structure.
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
Not Working maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and
Remove cover/lid after applying 80 lbs. of lift. reinstalled by one maintenance
person.
1/9/2009 2009 Surface Water Design Manual-Appendix A
A-8
APPEl\DIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
-
NO. 5 -CATCH BASINS AND MANHOLES
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Structure Sediment Sediment exceeds 60% of the depth from the Sump of catch basin contains no
bottom of the catch basin to the invert of the sediment.
lowest pipe into or out of the catch basin or is
within 6 inches of lhe invert of the lowest pipe
into or out of the catch basin.
Trash and debris Trash or debris of more than Y2 cubic foot which No Trash or debris blocking or
is located immediately in front of the catch basin potentially blocking entrance to
opening or is blocking capacity of the catch basin catch basin.
by more than 10%.
Trash or debris in the catch basin that exceeds No trash or debris in the catch basin.
1
/3 the depth from the bottom of basin to invert the
lowest pipe into or out of the basin.
Dead animals or vegetation that could generate No dead animals or vegetation
odors that could cause complaints or dangerous present within catch basin.
gases (e.g., methane).
Deposits of garbage exceeding 1 cubic foot in No condition present which would
volume. attract or support the breeding of
insects or rodents.
Damage to frame Corner of frame extends more than % inch past Frame is even with curb.
and/or top slab curb face into the street (If applicable).
Top slab has holes larger than 2 square inches or Top slab is free of holes and cracks.
cracks wider than X inch.
Frame not sitting flush on top slab, i.e., Frame is sitting flush on top slab.
separation of more than% inch of lhe frame from
the top slab.
Cracks in walls or Cracks wider than X inch and longer than 3 feet. Catch basin is sealed and
bottom any evidence of soil particles entering catch structurally sound.
basin through cracks, or maintenance person
judges that catch basin is unsound.
Cracks wider than Yz inch and longer than 1 foot No cracks more than 1/,. inch wide at
at the joint of any inleVoutlet pipe or any evidence the joint of inleUoutret pipe.
of soil particles entering catch basin through
cracks.
Settlement/ Catch basin has settled more than 1 inch or has Basin replaced or repaired to design
misalignment rotated more than 2 inches out of alignment. standards.
Damaged pipe joints Cracks wider than X-inch at the join! of the No cracks more than Y..-inch wide at
inleUoutlet pipes or any evidence of soil entering the joint of inlet/outlet pipes.
the catch basin at the joint of the inleUoutlet
pipes.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
I nleUOutlet Pipe Sediment Sediment filling 20% or more of the pipe. lnletloutlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inleVoutlet No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged Cracks wider than X-inch at the joint of the No cracks more than X-inch wide at
inlet/outlet pipes or any evidence of soil entering lhe joint of the inlet/outlet pipe.
al the joints of the inleUoutlet pipes.
2009 Surface Water Design Manual-Appendix A 1/9/2009
A-9
APPENDIX A MAINTENAI\CE REQUIREMENTS FLOW CONTROL, CONVEYANCE, ANlJ WQ FACILITIES
'
NO. 5 -CATCH BASINS AND MANHOLES
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Metal Grates Unsafe grate opening Grate with opening wider than 7
/8 inch. Grate opening meets design
(Catch Basins) standards.
Trash and debris Trash and debris that is blocking more than 20% Grate free of trash and debris.
of grate surface. footnote to guidelines for disposal
Damaged or missing Grate missing or broken member(s) of the grate. Grate is in place and meets design
Any open structure requires urgent standards.
maintenance.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place. Cover/lid protects opening to
Any open structure requires urgent structure.
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
Not Working maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and
Remove cover/lid after applying 80 lbs. of lift. reinstalled by one maintenance
person.
1/9/2009 2009 Surface Water Design Manual -Appendix A
A-10
APPENDIX;\ Mi\INTEN/\'ICE RFQIIIREMENTS FOR fl.OW CONTROL, CONVEYANCE. AKO WQ fi\CILITIES
NO. 6-CONVEYANCE PIPES AND DITCHES
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Pipes Sediment & debris Accumulated sediment or debris that exceeds Water flows freely through pipes.
accumulation 20% of the diameter of the pipe.
Vegetation/roots Vegetation/roots that reduce free movement of Water flows freely through pipes.
water through pipes.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Damage to protective Protective coating is damaged; rust or corrosion Pipe repaired or replaced.
coating or corrosion is weakening the structural integrity of any part of
pipe.
Damaged Any dent that decreases the cross section area of Pipe repaired or replaced.
pipe by more than 20% or is determined to have
weakened structural integrity of the pipe.
Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 Trash and debris cleared from
square feet of ditch and slopes. ditches.
Sediment Accumulated sediment that exceeds 20% of the Ditch cleaned/flushed of all sediment
accumulation design depth. and debris so that it matches design.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Vegetation Vegetation that reduces free movement of water Water flows freely through ditches.
through ditches.
Erosion damage to Any erosion observed on a ditch slope. Slopes are not eroding.
slopes
Rock lining out of One layer or less of rock exists above native soil Replace rocks to design standards.
place or missing (If area 5 square feet or more, any exposed native
Applicable) soil.
2009 Surface Water Design Manual -Appendix A [/9/2009
A-11
Al'l'ENDIX A MAINTENANCE REQlllREMENTS fLOW CONTROL, CONVEYANCE, A1'D WQ FACILITIES
NO. 7 -DEBRIS BARRIERS (E.G., TRASH RACKS)
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed.
Site Trash and debris Trash or debris plugging more than 20% of the Barrier clear to receive capacity flow.
area of the barrier.
Sediment Sediment accumulation of greater than 20% of Barrier clear to receive capacity flow.
accumulation the area of the barrier
Structure Cracked broken or Structure which bars attached to is damaged -Structure barrier attached to is
loose pipe is loose or cracked or concrete structure is sound.
cracked, broken of loose.
Bars Bar spacing Bar spacing exceeds 6 inches. Bars have at most 6 inche spacing.
Damaged or missing Bars are bent out of shape more than 3 inches. Bars in place \Mth no bends more
bars than% inch.
Bars are missing or entire barrier missing. Bars in place according to design.
Bars are loose and rust is causing 50% Repair or replace barrier to design
deterioration to any part of barrier. standards.
1/9/2009 2009 Surface Water Design Manual-Appendix A
A-12
APPENDIX A MAINTENA'JCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIF.S
---------···· ··--------·
NO. 8-ENERGY DISSIPATERS
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed.
Site Trash and debris Trash and/or debris accumulation. Dissipater clear of trash and/or
debris.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BM Ps implemented if
appropriate. No contaminants
present other than a surface oil film.
Rock Pad Missing or moved Only one layer of rock exists above native soil in Rock pad prevents erosion.
Rock area five square feet or larger or any exposure of
native soil.
Dispersion Trench Pipe plugged with Accumulated sediment that exceeds 20% of the Pipe cleaned/flushed so that it
sediment design depth. matches design.
Not discharging water Visual evidence of water discharging at Water discharges from feature by
properly concentrated points along trench (normal sheet flow.
condition is a "sheet flow'' of water along trench).
Perforations plugged. Over 1/4 of perforations in pipe are plugged with Perforations freely discharge flow.
debris or sediment.
Water flows out top of Water flows out of distributor catch basin during No flow discharges from distributor
"distributor" catch any storm less than the design storm. catch basin.
basin.
Receiving area over-Water in receiving area is causing or has No danger of landslides.
saturated potential of causing landslide problems.
Gabions Damaged mesh Mesh of gabion broken, twisted or deformed so Mesh is intact, no rock missing.
structure is weakened or rock may fall out.
Corrosion Gabion mesh shows corrosion through more than All gabion mesh capable of
1/.ii of its gage. containing rock and retaining
designed form.
Collapsed or Gabion basket shape deformed due to any All gabion baskets intact, structure
deformed baskets cause. stands as designed.
Missing rock Any rock missing that could cause gabion to No rock missing.
loose structural integrity.
Manhole/Chamber Worn or damaged Structure dissipating flow deteriorates to % or Structure is in no danger of failing.
post, baffles or side of original size or any concentrated worn spol
chamber exceeding one square foot which would make
structure unsound.
Damage to wall, Cracks wider than %-inch or any evidence of soil Manhole/chamber is sealed and
frame, bottom, and/or entering the structure through cracks, or structurally sound.
lop slab maintenance inspection personnel determines
that the structure is not structurally sound.
Damaged pipe joinls Cracks wider than %-inch at the joint of the No soil or water enters and no water inlet/outlet pipes or any evidence of soil entering discharges at the joint of inlet/outlet the structure at the joint of the inlet/outlet pipes. pipes.
2009 Surface Water Design Manual -Appendix A 1/9/2009
A-13
APPENDIX A MAINTENANCE REQUIREMENIS FLOW CONTROL, CONVEYANCE, ANO WQ EACII.ITIES
NO. 9 -FENCING
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Erosion or holes Erosion or holes more than 4 inches high and 12-No access under the fence.
under fence 18 inches wide permitting access through an
opening under a fence.
Wood Posts, Boards Missing or damaged Missing or broken boards, post out of plumb by No gaps on fence due to missing or
and Cross Members parts more than 6 inches or cross members broken broken boards, post plumb to within
1 X inches, cross members sound.
Weakened by rotting Any part showing structural deterioration due to All parts of fence are structurally
or insects rotting or insect damage sound.
Damaged or failed Concrete or metal attachments deteriorated or Post foundation capable of
post foundation unable to support posts. supporting posts even in strong
wind.
Metal Posts. Rails Damaged parts Post out of plumb more than 6 inches. Post plumb to within 1 % inches.
and Fabric
Top rails bent more than 6 inches. Top rail free of bends greater than
1 inch.
Any part of fence (including post, top rails, and Fence is aligned and meets design
fabric) more than 1 foot out of design alignment. standards.
Missing or loose tension wire. Tension wire in place and holding
fabric.
Deteriorated paint or Part or parts that have a rusting or scaling Structurally adequate posts or parts
protective coating condition that has affected structural adequacy. with a uniform protective coating.
Openings in fabric Openings in fabric are such that an 8-inch Fabric mesh openings within 50% of
diameter ball could fit through. grid size.
1/9/2009 2009 Surface Water Design Manual~ Appendix A
A-14
APPENDIX A MAIJ\TENANCE REQUIREMENTS HJR FLOW CONTROL, CONVEYANCE, AND WQ PACILITIES
-
NO. 10 -GA TES/BOLLARDS/ACCESS BARRIERS
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Chain Link Fencing Damaged or missing Missing gate. Gates in place.
Gate members
Broken or missing hinges such that gate cannot Hinges intact and lubed. Gate is
be easily opened and closed by a maintenance working freely.
person.
Gate is out of plumb more than 6 inches and Gate is aligned and vertical.
more than 1 foot out of design alignment.
Missing stretcher bar, stretcher bands, and ties. Stretcher bar, bands, and ties in
place.
Locking mechanism Locking device missing, no-functioning or does Locking mechanism prevents
does not lock gate not link to all parts. opening of gate.
Openings in fabric Openings in fabric are such that an 8-inch Fabric mesh openings within 50% of
diameter ball could fit through. grid size.
Bar Gate Damaged or missing Cross bar does not slNing open or closed, is Cross bar swings fully open and
cross bar missing or is bent to where it does not prevent closed and prevents vehicle access.
vehicle access.
Locking mechanism Locking device missing, no-functioning or does Locking mechanism prevents
does not lock gate not link to all parts. opening of gate.
Support post Support post does not hold cross bar up. Cross bar held up preventing vehicle
damaged access into facility.
Bollards Damaged or missing Bollard broken, missing, does not fit into support No access for motorized vehicles to
hole or hinge broken or missing. get into facility.
Does not lock Locking assembly or Jock missing or cannot be No access for motorized vehicles to
attached to rock bollard in place. get into factlity.
Boulders Dislodged Boulders not located to prevent motorized vehicle No access for motorized vehicles to
access. get into facility.
Circumvented Motorized vehicles going around or between No access for motorized vehicles to
boulders. get into facility.
2009 Surface Water Design Manual -Appendix A 1/9/2009
A-15
Al'l'ENlJIX A MAINTENANCE REQu!REMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO, 11 -GROUNDS (LANDSCAPING)
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Perlormed
Site Trash or litter Any trash and debris which exceed 1 cubic foot Trash and debris cleared from site.
per 1,000 square feet (this is about equal to the
amount of trash it would take to fill up one
standard size office garbage can). In general,
there should be no visual evidence of dumping.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a
height. height no greater than 6 inches.
Trees and Shrubs Hazard Any tree or limb of a tree identified as having a No hazard trees in facility.
potential to fall and cause property damage or
threaten human life. A hazard tree identified by
a qualified arborist must be removed as soon
as possible.
Damaged Limbs or parts of trees or shrubs that are split or Trees and shrubs with less than 5%
broken which affect more than 25% of the total of total foliage with split or broken
foliage of the tree or shrub. limbs.
Trees or shrubs that have been blown down or No blown down vegetation or
knocked over. knocked over vegetation. Trees or
shrubs free of injury.
Trees or shrubs which are not adequately Tree or shrub in place and
supported or are leaning over, causing exposure adequately supported; dead or
of the roots. diseased trees removed.
1/9/2009 2009 Surface Water Design Manual -Appendix A
A-I6
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL CONVEYANCE, AND WQ FACILITIES
' , ____
NO. 12 -ACCESS ROADS
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 Roadway drivable by maintenance
square feet (i.e., trash and debris would fill up vehicles.
one standards size garbage can).
Debris which could damage vehicle tires or Roadway drivable by maintenance
prohibit use of road. vehicles.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Blocked roadway Any obstruction which reduces clearance above Roadway overhead clear to 14 feet
road surface to less than 14 feet. high,
Any obstruction restricting the access to a 10-to At Jeasl 12-foot of width on access
12 foot width for a distance of more than 12 feet road.
or any point restricting access to less than a 10
foot width.
Road Surface Erosion, settlement, Any surface defect which hinders or prevents Road drivable by maintenance
potholes, soft spots, maintenance access. vehicles.
ruts
Vegetation on road Trees or other vegetation prevent access to Maintenance vehicles can access
surface facility by maintenance vehicles. facility.
Shoulders and Erosion Erosion within 1 foot of lhe roadway more than 8 Shoulder free of erosion and
Ditches inches wide and 6 inches deep. matching the surrounding road.
Weeds and brush Weeds and brush exceed 18 inches in height or Weeds and brush cut to 2 inches in
hinder maintenance access. height or cleared in such a way as to
allow maintenance access.
Modular Grid Contaminants and Any evidence of conlaminants or pollution such Materials removed and disposed of
Pavement pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Damaged or missing Access surface compacted because of broken on Access road surface restored so
missing modular block. road infiltrates.
2009 Surface Water Design Manual -Appendix A 1/9/2009
A,17
J\l'l'ENDIX A MAINTENANCE REQlllREMFI\TS PLOW CONTROL. CONVEYANCE. AND WQ FACILITIES
-
NO. 13 -BASIC BIOFIL TRA TION SWALE (GRASS)
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Perlormed
Site Trash and debris Any trash and/or debris accumulated on the No trash or debris on the bioswale
bioswale site. site.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Swale Section Sediment Sediment depth exceeds 2 inches in 10% of the No sediment deposits in grass
accumulation swale treatment area. treatment area of the bioswale.
Sediment inhibits grass growth over 10% of Grass growth not inhibited by
swale length. sediment.
Sediment inhibits even spreading of flow. Flow spreads evenly through swale
Erosion/scouring Eroded or scoured swale bottom due to No eroded or scoured areas in
channelization or high flows. bioswale. Cause of erosion or scour
addressed.
Poor vegetation Grass is sparse or bare or eroded patches occur Swale has no bare spots and grass
coverage in more than 10% of the swale bottom. is thick and healthy.
Grass too tall Grass excessively tall (greater than 1 O inches), Grass is between 3 and 4 inches tan,
grass is thin or nuisance weeds and other thick and healthy. No clippings left
vegetation has taken over. in swale. No nuisance vegetation
present.
Excessive shade Grass growth is poor because sunlight does not Health grass growth or swale
reach swale. converted to a wet bioswale.
Constant baseflow Continuous flow through the swale, even when it Baseflow removed from swale by a
has been dry for weeks or an eroded, muddy low-flow pea-gravel drain or
channel has formed in the swale bottom. bypassed around the swale.
Standing water Water pools in the swale between storms or does Swale freely drains and there is no
not drain freely. standing water in swale between
storms.
Channelization Flow concentrates and erodes channel through No flow channels in swale.
swale.
Flow Spreader Concentrated flow Flow from spreader not uniformly distributed Flows are spread evenly over entire
across entire swale width. swale width.
Inlet/Outlet Pipe Sediment Sediment filling 20% or more of the pipe. fnleUoutlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inleUoutlet No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged Cracks 'Wider than 12-inch at the joint of the No cracks more than Xi-inch wide at
inleUoutlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
l/912009 2009 Surface Water Design Manual -Appendix A
A-18
APPENDIX A Mi\INTENAJ\CE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
N0.14-WET BIOFILTRATION SWALE
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance Is Performed
Site Trash and debris Any trash and/or debris accumulated at the site. No trash or debris at the site.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline. concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Swale Section Sediment Sediment depth exceeds 2 inches in 10% of the No sediment deposits in treatment
accumulation swale treatment area. area.
Erosion/scouring Eroded or scoured swale bottom due to No eroded or scoured areas in
channelization or high flows. bioswale. Cause of erosion or scour
addressed.
Water depth Water not retained to a depth of about 4 inches Water depth of 4 inches through out
during the wet season. swale for most of wet season.
Vegetation ineffective Vegetation sparse, does not provide adequate Wetland vegetation fully covers
filtration or crowded out by very dense clumps of bottom of swale and no cattails or
cattail or nuisance vegetation. nuisance vegetation present.
Insufficient water Wetland vegetation dies due to lack of water. Wetland vegetation remains healthy
(may require converting to grass
lined bioswale
Flow Spreader Concentrated flow Flow from spreader not uniformly distributed Flows are spread evenly over entire
across entire swale width. swale width.
Inlet/Outlet Pipe Sediment Sediment filling 20% or more of the pipe. lnleUoutlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inleUoutlel No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged Cracks wider than ~-inch at the joint of the No cracks more than X-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
2009 Surface Water Design Manual -Appendix A 1/9/2009
A-19
APPENDIX A MAl'HENANCE REQUIREMENTS ELOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 15 -FILTER STRIP
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance Is Performed
Site Trash and debris Any trash and debris accumulated on the filter Filter strip site free of any trash or
strip site. debris
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil. gasoline, concrete slurries or paint. according 10 applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass Strip Sediment Sediment accumulation on grass exceeds 2 No sediment deposits in treatment
accumulation inches depth. area.
Erosion/scouring Eroded or scoured swale bottom due to No eroded or scoured areas in
channelization or high flows. bioswale. Cause of erosion or scour
addressed.
Grass too tall Grass excessively tall (greater than 1 O inches), Grass is between 3 and 4 inches tall,
grass is thin or nuisance weeds and other thick and healthy. No clippings left
vegetation has taken over. in swale. No nuisance vegetation
present.
Vegetation ineffective Grass has died out, become excessively tall Grass is healthy, less than 9 inches
(greater than 10 inches) or nuisance vegetation is high and no nuisance vegetation
taking over. present.
Flow Spreader Concentrated flow Flow from spreader not uniformly distributed Flows are spread evenly over entire
across entire swale width. swale width.
lnleUOutlet Pipe Sediment Sediment filling 20% or more of the pipe. lnleUoutlet pipes clear of sediment. accumulation
Trash and debris Trash and debris accumulated in inleVoutlet No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged Cracks wider than Y2-inch at the joint of the No cracks more than X-inch wide at
inleUoutlet pipes or any evidence of soil entering the joint of the inleUoutlet pipe.
at the joints of the inleUoutlet pipes.
1/9/2009 2009 Surface Water Design Manual -Appendix A
A-20
APPENDIX A MAINTENANCE RE()lJIREMENTS FOR FLOW CONTROL, CONVEY Al\CE, AND WQ FACILITIES
N0.16-WETPOND
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance Is Performed
Site Trash and debris Any trash and debris accumulated on the Wetpond site free of any trash or
wetpond site. debris.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a
height. height no greater than 6 inches.
Side Slopes of Dam, Rodent holes Any evidence of rodent holes if facility is acting Rodents removed or destroyed and
Berm, internal berm as a dam or berm, or any evidence of water dam or berm repaired.
or Embankment piping through dam or berm via rodent holes.
Tree growth Tree growth threatens integrity of dams. berms or Trees do not hinder facility
slopes, does not allow maintenance access, or performance or maintenance
interferes with maintenance activity. If trees are activities.
not a threat to dam, berm or embankment
integrity, are not interfering with access or
maintenance or leaves do not cause a plugging
problem they do not need to be removed.
Erosion Eroded damage over 2 inches deep where cause Slopes stabilized using appropriate
of damage is still present or where there is erosion conlrol measures. If erosion
potential for continued erosion. Any erosion is occurring on compacted slope, a
observed on a compacted slope. licensed civil engineer should be
consulted to resolve source of
erosion.
Top or Side Slopes Settlement Any part of a dam, berm or embankment that has Top or side slope restored to design
of Dam, Berm, settled 4 inches lower than the design elevation. dimensions. If settlement is
internal berm or significant, a licensed civil engineer
Embankment should be consulted to determine
the cause of the settlement.
Irregular surface on Top of berm not uniform and level. Top of berm graded to design
internal berm elevalion.
Pond Areas Sediment Accumulated sediment that exceeds 10% of the Sediment cleaned out to designed
accumulation (except designed pond depth. pond shape and depth.
first wetpool cell)
Sediment Sediment accumulations in pond bottom that Sediment storage contains no
accumulation (first exceeds the depth of sediment storage (1 foot) sediment.
wetpool cell) plus 6 inches.
Liner damaged (If Liner is visible or pond does not hold water as Liner repaired or replaced.
Applicable) designed.
Water level (first First cell empty, doesn't hold water. Water retained in first cell for most of
wetpool cell) the year.
Algae mats (first Algae mats develop over more than 10% of the Algae mats removed (usually in the
wetpool cell) water surface should be removed. late summer before Fall rains,
especially in Sensitive Lake
Protection Areas.)
Gravity Drain Inoperable valve Valve will not open and close. Valve opens and closes normally.
Valve won't seal Valve does not seal completely. Valve completely seals closed.
Emergency Overflow Tree growth Tree growth impedes flow or threatens stability of Trees removed.
Spillway spillway.
2009 Surface Water Design Manual -Appendix A 1/912009
A-21
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CO~TROL. CONVEYANCE, AND WQ FACILITIES
-~·~~------
N0.16-WETPOND
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance Is Pertormed
Rock missing Only one layer of rock exists above native soi! in Spillway restored to design
area five square feet or larger, or any exposure of standards.
native soil at the top of out flow path of spillway.
Rip-rap on inside slopes need not be replaced.
Inlet/Outlet Pipe Sediment Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inleUoutlet No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged Cracks wider than !-'2-inch at the joint of the No cracks more than %-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
1/9/2009 2009 Surface Water Design Manual -Appendix A
A-22
APPENDIX A MAINTf.NAl\CE REQUTREMENTS fOR fl.OW COJ\TROI, CONVEY ANCf., AND WQ f ACII.ITIES
N0.17-WETVAULT
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash and debris Trash and debris accumulated on facility site. Trash and debris removed from
facility site.
Treatment Area Trash and debris Any trash and debris accumulated in vault No trash or debris in vault.
(includes floatables and non-floatables).
Sediment Sediment accumulation in vault bottom exceeds No sediment in vault.
accumulation the depth of the sediment zone plus 6 inches.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Vault Structure Damage to wall. Cracks wider than Y.i-inch, any evidence of soil Vault is sealed and structurally
frame, bottom, and/or entering the structure through cracks, vault does sound.
top slab not retain water or qualified inspection personnel
determines that the vault is not structurally
sound.
Baffles damaged Baffles corroding, cracking, warping and/or Repair or replace baffles or walls to
showing signs of failure or baffle cannot be specifications.
removed.
Ventilation Ventilation area blocked or plugged. No reduction of ventilation area
exists.
lnleUOutlet Pipe Sediment Sediment filling 20% or more of the pipe. lnleVoutlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inleVoutlet No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged Cracks wider than %:-inch at the joint of the No cracks more than X-inch wide at
inleVoutlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inleUoutlet pipes.
Gravity Drain Inoperable valve Valve will not open and close. Valve opens and closes normally.
Valve won't seal Valve does not seal completely. Valve completely seals closed.
Access Manhole Access cover/lid Access cover/lid cannot be easily opened by one Access cover/lid can be opened by
damaged or difficult to person. Corrosion/deformation of cover/lid. one person.
open
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
not working maintenance person with proper toots. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and
remove cover/lid after applying BO lbs of lift. reinstalled by one maintenance
person.
Access doors/plate Large access doors not flat and/or access Doors close flat and covers access
has gaps, doesn't opening not completely covered. opening completely.
cover completely
Lifting Rings missing, Lifting rings not capable of lifting weight of door Lifting rings sufficient to lift or
rusted or plate. remove door or plate.
Ladder rungs unsafe Missing rungs, misalignment, rust, or cracks. Ladder meets design standards.
Allows maintenance person safe
access.
2009 Surface Water Design Manual -Appendix A 1/9/2009
A-23
APPE'lDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, ANIJ WQ FACILITIES
NO, 18 -STORMWATER WETLAND
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance Is Performed
Site Trash and debris Trash and debris accumulated on facility site. Trash and debris removed from
facility site.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a
height. height no greater than 6 inches.
Side Slopes of Dam, Rodent holes Any evidence of rodent holes if facility is acting Rodents removed or destroyed and
Berm, internal berm as a dam or berm, or any evidence of water dam or berm repaired.
or Embankment piping through dam or berm via rodent holes.
Tree growth Tree growth threatens integrity of dams, berms or Trees do not hinder facility
slopes, does not allow maintenance access, or performance or maintenance
interferes with maintenance activity. If trees are activities.
not a threat to dam, berm, or embankment
integrity or not interfering with access or
maintenance, they do not need to be removed.
Erosion Eroded damage over 2 inches deep where cause Slopes stabilized using appropriate
of damage is still present or where there is erosion control measures. If erosion
potential for continued erosion. My erosion is occurring on compacted slope, a
observed on a compacted slope. licensed civil engineer should be
consulted to resolve source of
erosion.
Top or Side Slopes Settlement Any part of a dam, berm or embankment that has Top or side slope restored 10 design
of Dam, Berm, settled 4 inches lower than the design elevalion. dimensions. lf settlement is
internal berm or significant. a licensed civil engineer
Embankment should be consulted to determine
the cause of the settlement.
Irregular surface on Top of berm not uniform and level. Top of berm graded flat to design
internal berm elevation.
Pond Areas Sediment Sediment accumulations in pond bottom that Sediment storage contains no
accumulation (first exceeds the depth of sediment storage (1 foot) sediment.
cell/forebay) plus 6 inches.
Sediment Accumulated sediment thal exceeds 10% of the Sediment cleaned out to designed
accumulation (wetland designed pond depth. pond shape and depth.
cell)
Liner damaged (If Liner is visible or pond does not hold water as Liner repaired or replaced.
Applicable) designed.
Water level (first Cell does not hold 3 feet of water year round. 3 feet of water retained year round.
cell/forebay)
Water level (wetland Cell does not retain water for at least 1 O months Water retained at least 1 O months of
cell) of the year or wetland plants are not surviving. the year or wetland plants are
surviving.
Algae mats (first Algae mats develop over more than 10% of the Algae mats removed (usually ln the
cell/forebay) water surface should be removed. late summer before Fall rains,
especially in Sensitive Lake
Protection Areas.)
Vegetation Vegetation dead, dying, or overgrown (cattails) or Plants in wetland cell surviving and
not meeting original planting specifications. not interfering with wetland function.
1/9/2009 2009 Surface Water Design Manual-Appendix A
A-24
APPENDIX A MAl~TENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEY AI\CL AND WQ FACILITIES
NO. 18 -STORMWATER WETLAND
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance Is Performed
Gravity Drain Inoperable valve Valve will not open and close. Va!ve opens and closes normally.
Valve won't seal Valve does not seal completely. Valve completely seals closed.
Emergency Overflow Tree growth Tree growth impedes flow or threatens stability of Trees removed.
Spillway spillway.
Rock missing Only one layer of rock exists above native soil in Spillway restored to design
area five square feet or larger, or any exposure of standards.
native soil at the top of out flow path of spillway.
Rip~rap on inside slopes need not be replaced.
Inlet/Outlet Pipe Sediment Sediment filling 20% or more of the pipe. lnlet/oullet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged Cracks wider than Yi-inch at the joint of the No cracks more than X-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
2009 Surface Water Design Manual -Appendix A 1/9/2009
A-25
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, A'ID WQ FACILITIES
--------------
NO, 19 -SAND FILTER POND
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance Is Performed
Site Trash and debris Trash and debris accumulated on facility site. Trash and debris removed from
facility site.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard to County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a
(not in the treatment height. height no greater than 6 inches.
area)
Pre-Treatment (if Sediment Sediment accumulations in pond bottom that Sediment storage contains no
applicable) accumulation exceeds the depth of sediment storage (1 foot) sediment.
plus 6 inches.
Liner damaged (If Liner is visible or pond does not hold water as Liner repaired or replaced.
Applicable) designed.
Water level Cell empty, doesn't hold water. Water retained in first cell for most of
the year.
Algae mats Algae mats develop over more than 10% of the Algae mats removed (usually in the
water surface should be removed. late summer before Fall rains,
especially in Sensitive Lake
Protection Areas.)
Pond Area Sediment Sediment or crust depth exceeds %-inch over 10 No sediment or crust deposit on
accumulation % of surface area of sand filter. sand filter that would impede
permeability of the filter section.
Grass (if applicable) Grass becomes excessively tall (greater than 6 Mow vegetation and/or remove
inches) or when nuisance weeds and other nuisance vegetation.
vegetation start to take over or thatch build up
occurs.
Side Slopes of Pond Rodent holes Any evidence of rodent holes if facility is acting Rodents removed or destroyed and
as a dam or berm, or any evidence of water dam or berm repaired.
piping through dam or berm via rodent holes.
Tree growth Tree growth threatens integrity of dams. berms or Trees do not hinder facility
slopes, does not allow maintenance access, or performance or maintenance
interferes with maintenance activity. If trees are activities.
not a threat to dam, berm, or embankment
integrity or not interfering with access or
maintenance, they do not need to be removed.
Erosion Eroded damage over 2 inches deep where cause Slopes stabilized using appropriate
of damage is still present or where there is erosion control measures. ff erosion
potential for continued erosion. Any erosion is occurring on compacted slope, a
observed on a compacted slope. licensed civil engineer should be
consulted to resolve source of
erosion.
1/912009 2009 Surface Water Design Manual-Appendix A
A-26
APPENDIX A 'vlAINTENA'JCE REQl/JREMENTS FOR FLOW CO'JTROL, CONVEY i\NCE, AND WQ Fi\CILII IES
NO. 19 -SAND FILTER POND
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintena nee Is Performed
Sand Filter Media Plugging Drawdown of water through the sand filter media, Sand filter media surface is aerated
takes longer than 24 hours. and/or flow through and drawdown rate is normal.
lhe overilow pipes occurs frequently. A sieve
analysis of >4% -100 or >2% -200 requires
replacing sand filter media.
Prolonged flows Sand is saturated for prolonged periods of time Excess flows bypassed or confined
(several weeks) and does not dry out between to small portion of filter media
storms due to continuous base flow or prolonged surface.
flows from detention facilities.
Short circuiting Flows become concentrated over one section of Flow and percolation of water
the sand filter rather than dispersed or drawdown through the sand filter is uniform and
rate of pool exceeds 12 inches per hour. dispersed across the entire filter
area and drawdown rate is normal.
Media thickness Sand thickness is less than 6 inches. Rebuild sand thickness to a
minimum of 6 inches and preferably
to 18 inches.
Underdrains and Sediment/debris Underdrains or clean-outs partially plugged or Underdrains and clean-outs free of
Clean-Outs filled with sediment and/or debris. Junction sediment and debris and are
box/cleanout wyes not watertight. watertight.
lnleUOutlet Pipe Sediment Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes.
pipes (includes floatabtes and non-floatabtes).
Damaged Cracks wider than Yz-inch at the joint of the No cracks more than X-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
Rock Pad Missing or out of Only one layer of rock exists above native soil in Rock pad restored to design
place area five square feet or larger, or any exposure of standards.
native soil.
Flow spreader Concentrated flow Flow from spreader not uniformly distributed Flows spread evenly over sand filter.
across sand filter.
2009 Surface Water Design Manual -Appendix A 1/9/2009
A-27
APPPNllIX A MATNTPNANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, ANlJ WQ FACILITIES
NO. 20 -SAND FILTER VAULT
Maintenance Defect or Problem Condition When Maintenance is Needed Resu Its Expected When
Component Maintenance is Performed
Site Trash and debris Trash and debris accumulated on facility site. Trash and debris removed from
facility site.
Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation
constitute a hazard 10 County personnel or the removed according to applicable
public. regulations. No danger of noxious
vegetation where County personnel
or the public might normally be.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a
height. height no greater than 6 inches.
Pre-Treatment Sediment Sediment accumulation exceeds the depth of the Sediment storage contains no
Chamber accumulation sediment zone plus 6 inches. sediment.
Sand Filter Media Sediment Sediment depth exceeds %-inch on sand filter Sand filter freely drains at normal
accumulation media. rate.
Trash and debris Trash and debris accumulated in vault (floatables No trash or debris in vault.
and non-floalables).
Plugging Orawdown of water through the sand filter media, Sand filter media drawdown rate is
takes longer than 24 hours, and/or flow through normal.
the overflow pipes occurs frequently. A sieve
analysis of >4% -100 or >2% -200 requires
replacing sand filter media.
Short circuiting Seepage or flow occurs along the vault walls and Sand filter media section re-laid and
corners. Sand eroding near inflow area. compacted along perimeter of vault
Cleanout wyes are not watertight. to form a semi-seal. Erosion
protection added to dissipate force
of incoming flow and curtail erosion.
Vault Structure Damaged to walls, Cracks wider than %-inch, any evidence of soil Vault replaced or repaired to provide
frame, bottom and/or entering the structure through cracks or qualified complete sealing of the structure.
top slab. inspection personnel determines that the vault is
not structurally sound.
Ventilation Ventilation area blocked or plugged. No reduction of ventilation area
exists.
Underdrains and Sediment/debris Underdrains or clean-outs partially plugged, filled Underdrains and clean-outs free of
Cleanouts with sediment and/or debris or not watertight. sediment and debris and sealed.
Inlet/Outlet Pipe Sediment Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged Cracks wider than %-inch at the joint of the No cracks more than X-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
1/9/2009 2009 Surface Water Design Manual-Appendix A
A-28
APPENDTX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL. COI\VEYAI\CE. AND WQ FACILITIES
.. ··---
NO. 20 -SAND FILTER VAULT
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Pertormed
Access Manhole Cover/lid not in place Cover/lid is missing or only partially in place. Manhole access covered.
Any open manhole requires immediate
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
not working maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and remove cover/lid after applying 80 lbs of lift. reinstalled by one maintenance
person.
Ladder rungs unsafe Missing rungs, misalignment, rust, or cracks. Ladder meets design standards.
Allows maintenance person safe
access.
Large access Damaged or difficult Large access doors or plates cannot be Replace or repair access door so it
doors/plate to open opened/removed using normal equipment. can opened as designed.
Gaps, doesn't cover Large access doors not flat and/or access Doors close flat and covers access
completely opening not completely covered. opening completely.
Lifting Rings missing. Lifting rings not capable of lifting weight of door Lifting rings sufficient to lift or
rusted or plate. remove door or plate.
2009 Surface Water Design Manual -Appendix A 1/9/2009
A-29
Al'l'ENl)IX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, ANIJ WQ FACILITIFS
NO. 21 -STORM FILTER (CARTRIDGE TYPE)
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Site Trash and debris Any trash or debris which impairs the function of Trash and debris removed from
the facility. facility.
Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of
pollution as oils, gasoline, concrete slurries or paint. according to applicable regulations.
Source control BMPs implemented if
appropriate. No contaminants
present other than a surface oil film.
Life cycle System has not been inspected for three years. Facility is re-inspected and any
needed maintenance performed.
Vault Treatment Sediment on vault Greater than 2 inches of sediment. Vault is free of sediment.
Area floor
Sediment on top of Greater than % inch of sediment. Vault is free of sediment.
cartridges
Multiple scum lines Thick or multiple scum lines above top of Cause of plugging corrected,
above top of cartridges. Probably due to plugged canisters or canisters replaced if necessary.
cartridges underdrain manifold.
Vault Structure Damage to wall, Cracks wider than X-inch and any evidence of Vault replaced or repaired to design
Frame, Bottom, and/or soil particles entering the structure through the specifications.
Top Slab cracks, or qualified inspection personnel
determines the vault is not structurally sound.
Baffles damaged Baffles corroding, cracking warping, and/or Repair or replace baffles to
showing signs of failure as determined by specification.
maintenance/inspection person.
Filter Media Standing water in 9 inches or greater of static water in the vault for No standing water in vault 24 hours
vault more than 24 hours following a rain event and/or after a rain event.
overflow occurs frequently. Probably due to
plugged filter media, underdrain or outlet pipe.
Short circuiting Flows do not properly enter filter cartridges. Flows go through filter media.
Underdrains and Sediment/debris Underdrains or clean-outs partially plugged or Underdrains and clean-outs free of
Clean-Outs filled with sediment and/or debris. sediment and debris.
fnleUOutlet Pipe Sediment Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes.
pipes (includes ftoatables and non-floatables).
Damaged Cracks wider than X-inch at the joint of the No cracks more than X-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
al the joints of the inlet/outlet pipes.
Access Manhole Cover/lid not in place Cover/lid is missing or only partially in place. Manhole access covered.
Any open manhole requires immediate
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
not working maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and
remove cover/lid after applying 80 lbs of lift. reinstalled by one maintenance
person.
Ladder rungs unsafe Missing rungs, misalignmenl, rust, or cracks. Ladder meets design standards.
Allows maintenance person safe
access.
Large access Damaged or difficult Large access doors or plates cannot be Replace or repair access door so it
doors/plate to open opened/removed using normal equipment. can opened as designed.
1/9/2009 2009 Surface Water Design Manual-Appendix A
A-30
APPENDIX A MAINTEI\ANCE RFQl/lRE.MENTS EOR El.OW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 21 -STORM FILTER (CARTRIDGE TYPE)
Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Gaps, doesn't cover Large access doors not flat and/or access Doors close flat and cover access
completely opening not completely covered. opening completely.
Lifting Rings missing, Lifting rings no! capable of lifting weight of door Lifting rings sufficient to lift or
rusted or plate. remove door or plate.
2009 Surface Water Design Manual -Appendix A 1/9/2009
A-3\
APPENDIX A MAll\TENi\NCE REQUIREMENTS FLOW CONTROL, CONVEYA'JCE, AND WQ FACILITIES
~~--
NO. 22-BAFFLE OIUWATER SEPARATOR
Maintenance Defect Condition When Maintenance is Needed Results Expected When
Component Maintenance is Petformed
Site Trash and debris Any trash or debris which impairs the function of Trash and debris removed from
the facility. facility.
Contaminants and Floating oil in excess of 1 inch in first chamber, No contaminants present other than
pollution any oil in other chambers or other contaminants a surface oil film.
of any type in any chamber.
Vault Treatment Sediment Sediment accumulates exceeds 6 inches in the No sediment in the vault.
Area accumulation vault.
Discharge water not Inspection of discharge water shows obvious Effluent discharge is clear.
clear signs of poor water quality-effluent discharge
from vault shows thick visible sheen.
Trash or debris Any trash and debris accumulation in vault Vault is clear of trash and debris.
accumulation (floatables and non-floatables).
Oil accumulation Oil accumulations that exceed 1 inch, at the No visible oil depth on water.
surface of the water in the oil/water separator
chamber.
Vault Structure Damage to Wall, Cracks wider than %-inch or evidence of soil Vault replaced or repaired to design
Frame, Bottom, and/or particles entering the structure through the specifications.
Top Slab cracks, or maintenance/inspection personnel
determines that the vault is not structurally
sound.
Baffles damaged Baffles corroding, cracking, warping and/or Repair or replace baffles to
showing signs of failure as determined by specifications.
maintenance inspection personnel.
Gravity Drain Inoperable valve Valve will not open and close. Valve opens and closes normally.
Valve won't seal Valve does not seal completely. Valve completely seals closed.
lnleUOutlet Pipe Sediment Sediment filling 20% or more of the pipe. lnlet/outlel pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes.
pipes (includes floatables and non-floatabfes).
Damaged Cracks wider than %-inch at the joint of the No cracks more than X-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at lhe joints of the inlet/outlet pipes.
Access Manhole Cover/lid not in place Cover/lid is missing or only partially in place. Manhole access covered.
Any open manhole requires Immediate
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
not working maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does
not work.
Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and
remove cover/lid after applying 80 lbs of lift. reinstalled by one maintenance
person.
Ladder rungs unsafe Missing rungs, misalignment, rust, or cracks. Ladder meets design standards.
Allows maintenance person safe
access.
Large access Damaged or difficult Large access doors or plates cannot be Replace or repair access door so it
doors/plate to open opened/removed using normal equipment. can opened as designed.
Gaps, doesn't cover Large access doors not flat and/or access Doors close flat and cover access
completely opening not completely covered. opening completely.
Lifting Rings missing, Lifting rings not capable of lifting weight of door Lifting rings sufficient to lift or
rusted or cover/lid. remove cover/lid.
1/9/2009 2009 Surface Water Design Manual -Appendix A
A-32
APPENDIX A '.v!ATNTENA"ICE RFQUIRFMFNTS FOR FI.OW CO'JTROI., CONVEYANCE, AO:D WQ FACILITIF.S
----
NO. 23 -COALESCING PLATE OIL/WATER SEPARATOR
Maintenance Defect Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed -----
Site Trash and debris Any trash or debris which impairs lhe function of Trash and debris removed from
the facility. facility.
Contaminants and Floating oil in excess of 1 inch in first chamber. No contaminants present other than
pollution any oil in other chambers or other contaminants a surface oil film.
of any type in any chamber.
Vault Treatment Sediment Sediment accumulation of 6 inches or greater in No sediment in the forebay.
Area accumulation in the the forebay.
forebay
Discharge water not Inspection of discharge waler shows obvious Repair function of plates so effluent
clear signs of poor water quality -effluent discharge is clear.
from vault shows thick visible sheen.
Trash or debris Trash and debris accumulation in vault Trash and debris removed from
accumulation (floatables and non-floatables). vault.
Oil accumulation Oil accumulation that exceeds 1 inch al lhe water No visible oil depth on water and
surface in the in the coalescing plate chamber. coalescing plates clear of oil.
Coalescing Plates Damaged Plate media broken, deformed, cracked and/or Replace that portion of media pack
showing signs of failure. or entire plate pack depending on
severity of failure.
Sediment Any sediment accumulation which interferes with No sediment accumulation
accumulation the operation of the coalescing plates. interfering with the coalescing
plates.
Vault Structure Damage to Wall, Cracks wider than %-inch and any evidence of Vault replaced or repaired to design
Frame, Bottom, and/or soil particles entering the structure through the specifications.
Top Slab cracks, or maintenance inspection personnel
determines that the vault is not structurally
sound.
Baffles damaged Baffles corroding, cracking, warping and/or Repair or replace baffles to
showing signs of failure as determined by specifications.
mainlenance/i nspection person.
Ventilation Pipes Plugged Any obstruction to lhe ventilation pipes. Ventilation pipes are clear.
Shutoff Valve Damaged or Shutoff valve cannot be opened or closed. Shutoff valve operates normally.
inoperable
Inlet/Outlet Pipe Sediment Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
accumulation
Trash and debris Trash and debris accumulated in inlet/outlet No trash or debris in pipes.
pipes (includes floatables and non-floatables).
Damaged Cracks wider than 1h-inch at the joint of the No cracks more than "Xi-inch wide at
inlet/outlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe.
at the joints of the inlet/outlet pipes.
Access Manhole Cover/lid not in place Cover/lid is missing or only partially in place. Manhole access covered.
Any open manhole requires immediate
maintenance.
Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools.
not working maintenance person with proper lools. Bolts
cannot be seated. Self-locking cover/lid does not
work.
Cover/lid difficult to One maintenance person cannot remove Cover/lid can be removed and
remove cover/lid after applying 80 lbs of lift. reinstalled by one maintenance
person.
Ladder rungs unsafe Missing rungs, misalignment, rust, or cracks. Ladder meets design standards.
Allows maintenance person safe
access.
2009 Surface Water Design Manual -Appendix A 1/9/2009
A-33
APPENDIX A MAINTENANCE REQUIREMEKTS FLOW CONTROL, CONVEYANCE, AKD WQ f ACILITIES
NO. 23 -COALESCING PLATE OIUWATER SEPARATOR
Maintenance Defect Condition When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Large access Damaged or difficult Large access doors or plates cannot be Replace or repair access door so it
doors/plate to open opened/removed using normal equipment. can opened as designed.
Gaps, doesn't cover Large access doors not flat and/or access Doors close flat and cover access
completely opening not completely covered. opening completely.
Lifting Rings missing, Lifting rings not capable of lifting weight of door Lifting rings sufficient to lift or
rusted or plate. remove door or plate.
1/9/2009 2009 Surface Water Design Manual-Appendix A
A-34
APPENDIX A YIAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 24-CATCH BASIN INSERT
Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When
Component Maintenance is Performed
Media Insert Visible Oll Visible oil sheen passing through media Media inset replaced.
Insert does not fit Flow gets into catch basin without going through All flow goes through media.
catch basin properly media.
Filter media plugged Filter media plugged. Flow through filter media is normal.
Oil absorbent media Media oil saturated. Oil absorbent media replaced.
saturated
Water saturated Catch basin insert is saturated with water, which Insert replaced.
no longer has the capacity to absorb.
Service life exceeded Regular interval replacement due to typical Media replaced at manufacturer's
average life of media insert product, typically one recommended interval.
month.
Seasonal 1/Vhen storms occur and during the wet season. Remove, clean and replace or Install
maintenance new insert after major storms.
monthly during the wet season or at
manufacturer's recommended
interval.
2009 Surface Water Design Manual -Appendix A 1/9/2009
A-35