TECHNICAL INFORMATION REPORT
Aberdeen Ave Subdivision
1824 Aberdeen Ave NE
Renton, WA 98056
02/16/2017
CG Project No. 16037 .20
Table of Contents
TIR Section I -Project Overview
TIR Section II -Conditions and Requirements Summary
TIR Section Ill -Off Site Analysis
TIR Section IV -Flow Control and Water Quality Facility Analysis and Design
TIR Section V-Conveyance System Analysis and Design
TIR Section VI -Special Reports and Studies
TIR Section VII -Other Permits
TIR Section VIII -CSWPPP Analysis and Design
TIR Section IX -Bond Quantities, Facility Summaries, and Declaration of Covenant
TIR Section X -Operation and Maintenance Manual
CT
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.ssoo I 1. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
TIR Section I Summary
Narrative
TIR Section I -Project Overview
List of Figures: 1. TIR Worksheet
2. Site Location
3. Aerial Photograph Map
February 16, 2017
Section I, Page 1
4. Site Drainage, Drainage Basins, Sub-basins, and Site Characteristics
5. Soils
The project proposes to subdivide a single 16,161 sf parcel in the R-8 zone into 2 individual single-family
lots. The site currently contains one single-family home with a detached garage and a detached
accessory building. The existing structures will be demolished in order to add an access and utility tract,
and a house on the back lot. The project will add more than 2,000 sf of impervious surfaces and will
therefore address Full Drainage requirements from the 2017 Renton Surface Water Design Manual
(RSWDM). Lots 1 and 2 will be developed in the future. Stormwater requirements are addressed as part
of this project for the driveway tract and for the future lots.
Address: 1824 Aberdeen Ave NE, Renton, WA 98056
Tax Parcel Number: 334390-1606
The existing lot will be divided as follows:
Proposed Short Plat Coverage
Lot 1: 5,677 sf (0.130 ac)
Lot 2: 7,903 sf (0.181 ac)
Tract: 2,581 sf {0.059 acl
Total: 16,128 sf (0.370 ac)
Flow Control per Core Requirement #3 must be evaluated for this site because over 5,000 sf of new plus
replaced impervious surface will be created. The project falls within the City's Flow Control Duration
Standard (Forested Conditions). However, the project is exempt from the facility requirement because
there is no more than a 0.15-cfs difference (when modeled using 15-minute time steps) in the 100-year
peak flow. Please see Section IV for the Western Washington Hydrology Model report and assumptions.
Flow Control Best Management Practices (BMPs) must be addressed per Core Requirement #9 to
mitigate stormwater runoff impacts because the site adds and/or replaces more than 2,000 square feet
of impervious surface. Flow Control BMPs were evaluated for the access/utility tract per Section
1.2.9.3.2 "Small Road Improvement and Urban Road Improvement BMP Requirements) and for the
individual lots per Section 1.2.9.2.1 "Small Lot BMP Requirements." A single infiltration trench is
proposed to meet the requirements for the access/utility tract and for both lots. Please see Section IV
for the infiltration trench sizing and assumptions.
CT?
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 42S.778.8soo I t. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
Figure 1-1: Technical Information Report {TIR) Worksheet
See attached pages.
cm
ENGINEERING
February 16, 2017
Section I, Page 2
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I f. 425.778.5536
www.cgengineering.com
KIN(i COlJKTY, WASH!KGTON, SURFACE WATER DESIGN MAKUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER
Project Owner Prime Metropolis Properties, Inc.
Phone 925.377.8882
Address 950 Taraval St.
San Francisco, CA 94116
Project Engineer Jared Underbrink
Company CG Engineering
Phone 425.778.8500
Part 3 TYPE OF PERMIT APPLICATION
D Landuse (e.g.,Subdivision / Short Subd. I UPD)
D Building (e.g.,M/F /Commercial/ SFR)
D Clearing and Grading
D Right-of-Way Use
fiJ Other Land Use Permit Master Application
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report
0 Full
Type of Drainage Review D Targeted
(check one): D Simplified
D Large Project
Date (include revision D Directed
dates): 02/16/17
Date of Final:
Part 6 SWDM ADJUSTMENT APPROVALS
Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Name Aberdeen Subdivision
DPER Permit# ----------
Location Township _2~3 ____ _
Range 5
Section __ 5 _____ _
Site Address 1824 Aberdeen Ave NE
Renton, WA 98056
Part 4 OTHER REVIEWS AND PERMITS
D DFW HPA D Shoreline
D COE404 Management
D Structural D DOE Dam Safety RockeryNaulU __ D FEMA Floodplain D ESA Section 7 D COE Wetlands
D Other
Site Improvement Plan (Engr. Plans)
0 Plan Type (check Full
one): D Modified
D Simplified
Date (include revision
dates):
Date of Final:
Type (circle one): Standard / Experimental / Blanket
Description: (include conditions in TIR Section 2)
Approved Adjustment No. Date of Approval:
2016 Surface \Vater Design Manual
I
4/24/2016
I
I
' '
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes;@ Describe:
Start Date:
Completion Date: Re: KCSWDM Adjustment No_
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan:-----------------------------
Special District Overlays: __________________________ _
Drainage Basin: East Lake Washington (per King County iMap)
Stormwater Requirements: The site falls within the City of Renton's Flow Control Duration Standard
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
D River/Stream ----------
D Lake
D Wetlands __________ _
D Closed Depression ________ _
D Floodplain ------------
D other -------------
Part 10 SOILS
Soil Type Slopes
Indianola Loamy Sand 5-15%
D High Groundwater Table (within 5 feet)
D Other
D Additional Sheets Attached
2016 Surface Water Design Manual
2
D Steep Slope -----------
D Erosion Hazard ----------
D Landslide Hazard ----------
D Coal Mine Hazard----------
0 Seismic Hazard _________ _
D Habitat Protection ----------
[) Zone 2 Aquifer Protection Area
Erosion Potential
D Sole Source Aquifer
D Seeps/Springs
4/24/2016
I
Kl"G COUNTY, WASHINGTON, SURfACE WATER DESIGN \1ANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE LIMITATION/ SITE CONSTRAINT
D Core 2 -Olfsite Analysis
D Sensitive/Critical Areas
D SEPA
D LID Infeasibility
D Other
D
D Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area)
Threshold Discharge Area: Total Site
(name or description)
Core Requirements (all 8 apply):
Discharge at Natural Location Number of Natural Discharge Locations: 1
Olfsite Analysis Level: Ci) 2 I 3 dated O 1 /20/16
Flow Control (include facility Level: 1 Q) 3 or Exemption Number 2
summary sheet) Flow Control BMPs Infiltration Trench
Conveyance System Spill containment located at:
Erosion and Sediment Control / CSWPP/CESCL/ESC Site Supervisor:
Construction Stormwater
Pollution Prevention Contact Phone:
After Hours Phone:
Maintenance and Operation Responsibility (circle one): ~/ Public
If Private, Maintenance Log Required: Yes@
Financial Guarantees and Provided: Yes@
Liability
Water Quality (include facility Type (circle one)~ Sens, Lake / Enhanced Basic / Bog
summary sheet) or Exemption No. Surface Area Exemption
Landscape Management Plan: Yes@
Special Requirements (as applicable):
Area Specific Drainage Type: CDA I SDO I MDP I BP I LMP / Shared Fae,/~
Requirements Name:
Floodplain/Floodway Delineation Type (circle one): Major / Minor I Exemption I <t§v
100-year Base Flood Elevation (or range):
Datum:
Flood Protection Facilities Describe:
2016 Surface Water Design Manual
3
4/24/2016
KING COUNTY, WASIIINGTO", SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area)
Source Control Describe land use:
(commercial I industrial land use) Describe any structural controls:
Oil Control High-use Site: Yes 1(tlg)
Treatment BMP:
Maintenance Agreement: Yes i@
with whom? -
Other Drainage Structures
Describe:
--
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION AFTER CONSTRUCTION
[I Clearing Limits 0 Stabilize exposed surfaces
CEJ Cover Measures @ Remove and restore Temporary ESC Facilities
CiJ Perimeter Protection Iii Clean and remove all silt and debris, ensure
[I Traffic Area Stabilization operation of Permanent Facilities, restore
[I Sediment Retention
operation of Flow Control BMP Facilities as
necessary
Iii Surface Water Collection Iii Flag limits of SAO and open space preservation
D Dewatering Control -N/A areas
[I Dust Control D Other
[) Flow Control
[I Protection of Flow Control BMP Facilities
(existing and proposed)
~ Maintain BMPs / Manage Project
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Flow Control Type/Description Water Quality Type/Description
D Detention D Vegetated Flowpath
D Infiltration D Wetpool
D Regional Facility [I Filtration Stormfilter (Basic WQ)
D Shared Facility D Oil Control
0 Flow Control BMPs Infiltration Trench D Spill Control
D Other D Flow Control BMPs
D Other
2016 Surface Water Design Manual
4
4/24/2016
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS
D Drainage Easement D Cast in Place Vault
!:El Covenant D Retaining Wall
D Native Growth Protection Covenant D Rockery > 4' High
0 Tract 0 Structural on Steep Slope
D Other 0 Other
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
incorporated into this worksheet a he attached Technical Information Report. To the best of my
knowled the informatio rovi ere is accurate.
'Z 2(
Signed/Date
2016 Surface Water Design Manual 4/24120[6
5
Aberdeen Ave Subdivision 16037.20
Technical Information Report
.·.'._
Y,,:7_...
·,· :L ·~-
'J .1•'. •. "'.';•
, i :, ~ : r ;
,, .-,,
-·~
'z· 1·
Gene Coulon
Memorial
Beach Park
a
r-i[" .·-.,I ~/[
,.
T
'" ,. ::t"•
May Creek
Park
'1a242mNn
Avenue Northeast
@
The Landing " ., Fry's Electronics ~-
' ' ,-.,i ·-:-•-·--,·
Figure 1-2: Site Location
CT
ENGINEERING
~-
@
t,F :'=:'.I, ~--
February 16, 2017
Section I, Page 3
,_':-,.;1,
=
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I t. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Tec hn ica l Information Report
• ENGINEERING
Fi gure 1-3 : Aerial Photograph
February 16, 20 17
Section I, Page 4
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I t. 425.778.5536
www.cgengi neering.com
Aberdee n Ave Su bd ivision 16037 .20
Techn ica l Information Report
ake
1nQton
• ENGINEERING
D rainage basin : East La k e
Washington -Renton
Feb ru ary 16, 20 17
Sec tion I, Page 5
\', ate, ,I ed
rame:
Cedar Ri ver / Lake
Wa shington
211h &t •
\'JRIA
rumber:
8
WRIA name : Cedar-Sammamish
r.E 16th St
NE 1 2th $1 ~
"' ,:
t'
~
\ ~
I ,1,~ lDrhl
S1 g 0
~
ljr 9rt, st !
%
/Jf 7th st "'
Highland s
P.ark
Re nton
Figure 1-4: Drainage Basin Map
;
INE 4t h St
3
~
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 4 25.778 .8500 I t. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subd ivis ion 16037.20
Techn ical Information Report
Figure 1-5 : Soil s
February 16, 2017
Sect ion I, Page 6
Underlying soi ls were determ i ned usin g th e Natural Resources Conservation Serv i ce soi l survey tool. Th e
site conta in s I ndianola loamy sand, 5 to 15%, corresponding t o hydro logic so i l group "A." A geotechnica l
report w ith a r ecommended infiltration rate is a lso prov id ed in Sect ion VI.
See attached p ages.
+
ENGINEERING
250 4th Avenue South, Su ite 200
Edmonds, WA 98020
ph. 425.778.8500 I t. 425.778.5536
www.cgengineering.com
• . . • • • • . . "' ....... • • •
... ' ...... • I ..... .. I ..... .1• I ..... .... . .. • I I
I ---... , --
I -
,, ,
-·~:},"~~1 ·!' ,:::·:~{!?·:::,: 9
.. .-.. t , J" ... $ • ,.. J .-'' i\ -·1. ~· ....... '.·4·~-:.·!~).~.
-~a
--------SRI' • • --.. ~ --
-)>
]--_ '1
D" l .
__ .,.
ff>
:i1' f
..,
Q.
ff>
ff>
'
:I
)>
'>-
L
~ w... .. _,·
-.
• -z -ff> --;--
.[k' .. -., . j
: -------------· ---·-· -
M
-I .
. • • ~·
. . I I • I
,t• I ,.,., .t• I .... ,I' I ····:· .... •II •II ...
~
r. • . ... ... r. •. : -I I I I
~ I I ... :.••• ., II ... • ..... ... C\:Z•
I .... ... .. I Cl::• .. -• .. • • .
• • . • . . ...... • . . . . •
Soil Map-King County Area, Washington
(Aberdeen Ave Subdivision)
MAP LEGEND
Area of Interest (AOI)
D
Soils
D -•
Area of Interest (AOI)
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
UJ Blowout
181 Borrow Pit
)IX Clay Spot
0 Closed Depression
X Gravel Pit
Gravelly Spot
0 Landfill
A. Lava Flow .,., Marsh or swamp
'l!.' Mine or Quarry
@ Miscellaneous Water
0 Perennial Water
V Rock Outcrop
+ Saline Spot
Sandy Spot
.... Severely Eroded Spot
* Sinkhole
j:, Slide or Slip
Id Sadie Spot
USDA Natural Resources
illiii Conservation Service
13 Spoil Area
0 Stony Spot
ro Very Stony Spot
'{? Wet Spot
6 Other .. Special Line Features
Water Features
Streams and Canals
Transportation
+++ Rails -,,...,,..,..
Interstate Highways
US Routes
Major Roads
Local Roads
Background
• Aerial Photography
Web Soil Survey
National Cooperative Soil Survey
MAP INFORMATION
The soil surveys that comprise your AOI were mapped at 1 :24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil line
placement. The maps do not show the small areas of contrasting
soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection. should be used if more accurate
calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of
the version date(s) listed below.
Soil Survey Area:
Survey Area Data:
King County Area, Washington
Version 11, Sep 14, 2015
Soil map units are labeled (as space allows) for map scales 1 :50,000
or larger.
Date(s) aerial images were photographed: Aug 31, 2013---0ct 6.
2013
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor shifting
of map unit boundaries may be evident.
11/7/2016
Page 2 of 3
Soil Map-King County Area, Washington
Map Unit Legend
Map Unit Symbol
lnC
Totals for Area of Interest
Natural Resources
Conservation Service
King County Area, Washington (WA633)
Map Unit Name I Acres in AOI
Indianola loamy sand. 5 to 15
I
percent slopes
--------
Web Soil Survey
National Cooperative Soil Survey
0.8
--~-
0.8
Aberdeen Ave Subdivision
Percent of AOI
100.0%
100.0%
11,7/2016
Page 3 of 3
Aberdeen Ave Subdivision 16037.20
Technical Information Report
February 16, 2017
Section II, Page 1
TIR Section II -Conditions and Requirements Summary
TIR Section II Summary
Core Requirements
The proposed project will comply with the 2017 Renton Surface Water Design Manual (RSWDM). The
project is being submitted for a Full Drainage Review because it proposes to add and/or replace over
2,000 square feet of impervious area. The project must comply with all 9 Core Requirements and all 6
Special Requirements. Therefore, the following conditions are required as specified by the RSWDM.
Core Requirements
Core Requirement #1: Discharge at the Natural Location: Discharge will remain at the natural location
and will flow from east to west. There is a public stormwater system in Aberdeen Ave NE that the site
will connect into.
Core Requirement #2: Offsite Analysis: Compliance with this requirement is indicated in Section Ill.
Core Requirement #3: Flow Control: The site is within a Conservation Flow Control Area. However, the
site is exempt from the flow facility requirement per Exception #2 of Section 1.2.3.1.B of the 2016
KCSWDM.
Core Requirement #4: Conveyance System: New pipe systems shall be designed with sufficient capacity
to convey and contain (at minimum) the 25-year peak flow, assuming developed conditions for onsite
tributary areas and existing conditions for any offsite tributary areas.
Core Requirement #5: Erosion & Sediment Control: A Construction Stormwater Pollution Prevention
Plan (CSWPPP) and narrative has been prepared. See Section VIII.
Core Requirement #6: Maintenance & Operations: Maintenance requirements are addressed in Section
X for the flow control BMP.
Core Requirement #7: Financial Guarantees & Liabilities: The project may be required to execute to the
City a construction bond prior to a permit and a maintenance bond prior to acceptance.
Core Requirement #8: Water Quality: Less than 5,000 square feet of new plus replaced pollution
generating impervious surface and less than% acres of new pollution generating pervious surface are
proposed. However, basic water quality treatment is required prior to infiltration for new plus replaced
PGIS areas per Special Requirement #6: Aquifer Protection Area.
Core Requirement #9: Flow Control BMPs: This is discussed in Section IV. An infiltration trench is
proposed to meet the flow control BMP requirement of this project. It was sized to fully infiltrate runoff
from the assumed roof areas of Lots 1 and 2, and from the proposed road surface of the access/utility
tract.
CT
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I I. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
Special Requirements
Special Requirement #1: Other Adopted Requirements: Not applicable.
Special Requirement #2: Flood Hazard Area Delineation: Not applicable.
Special Requirement #3: Flood Protection Facilities: Not applicable.
February 16, 2017
Section II, Page 2
Special Requirement #4: Source Control: Permanent and temporary source Controls are discussed in
Section 8 of this report.
Special Requirement #5: Oil Control: Not applicable.
Special Requirement #6: Aquifer Protection Area: The site is in Zone 2 of the Aquifer Protection Area.
The project proposes an infiltration trench to meet Core Requirement #9 and will therefore require
water quality treatment prior to infiltration as specified in Core Requirement #8 and Special
Requirement #5 OR demonstrate that the soil beneath the facility has properties that reduce the risk of
groundwater contamination from typical stormwater runoff. This is addressed in Section IV.
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I t. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
TIR Section Ill Summary
Narrative
TIR Section Ill -Off Site Analysis
February 16, 2017
Section Ill, Page 3
The site currently contains one single-family home with a detached garage and a detached accessory
building. The existing structures will be demolished in order to add an access and utility tract, and a
house on the back lot. The slope across the lot is downstream from east to west at an average of 4%.
Adjacent lots contain single family residences.
Task 1: Study Area Definition and Maps
The study area is defined as the project site and the area one mile downstream (minimum flow path
distance) from the proposed discharge location for the purposes of Task 2, and is defined as the
project site and a minimum of one-quarter mile downstream from the proposed discharge location
for the purposes of Tasks 3, 4, and 5.
The drainage basin map can be found in Figure 4 of Section 1. The site is within the East Lake
Washington drainage basin.
Task 2: Resource Review
Drainage and water quality problems and complaints were investigated using the King County iMap
website. None were found within the range of the required downstream analysis. The site does not
appear to contain nor is adjacent to any environmentally sensitive areas.
Task 3: Field Inspection
A site visit was done the morning of 01/20/2016. There did not appear to be any existing drainage
issues. There is an 18" public storm main on the western frontage of Aberdeen Ave NE.
cm
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I f. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subd iv ision 16037.20
Technical I nfor mation Report
Figure 111-1 View of Aberdeen Ave NE looking south .
Figure 111-2 View of site (on left) looking east.
• ENGINEERING
February 16, 2017
Sec tion Ill, Page 4
250 4th Avenue Sou t h, Suite 200
Edmonds, WA 98020
ph . 425.778 .8500 I t. 425.778.5536
www.cgengineeri ng .com
Abe rd een Ave Subd ivision 16037.20
Te chnical Inform at ion Repo rt
February 16, 2017
Sect ion I ll, Pa ge 5 ------
Figure 111 -3 View of Aberdeen Ave NE looking north.
Figure 111-4 View from ba ck of si te looking west.
4
ENGINEERING
250 4th Av en ue South, Su i te 200
Edmonds, WA 98020
ph. 425.778.8500 I t. 425.778.5536
www.cgengi neeri ng.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
Task 4: Drainage System Description and Problem Descriptions
February 16, 2017
Section Ill, Page 6
No drainage problems are expected. The existing conveyances adjacent to the site include an
18" public storm main on the western frontage of Aberdeen Ave NE. Site runoff is expected to
flow in the existing condition from east to west and connect into this system.
Task 5: Mitigation of Existing or Potential Problems
No existing drainage problems were discovered.
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I 1. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
February 16, 2017
Section V, Page 1
TIR Section V -Conveyance System Analysis and Design
TIR Section V Summary:
Narrative
Per Core Requirement #4, new pipe systems shall be designed with sufficient capacity to convey and
contain the 25-year peak flow. Conveyance capacity shall be demonstrated using the methods in
Chapter 4 of the KCSWDM.
Verification of capacity and performance must be provided for each element of the conveyance system.
The analysis must show design velocities and flows for all drainage facilities within the development, as
well as those offsite that are affected by the development.
The conveyance system will consist of 6" PVC pipes for roof and driveway runoff and a 6" ductile iron
pipe as the overflow from the infiltration trench. The 25-year peak flow for the total runoff from the
assumed impervious areas runoff prior to infiltration was calculated per WWHM and found to be 0.145
cfs. The conveyance capacity of a 6" ductile iron pipe with a minimum 1% slope is 0.56 cfs. Therefore, a
6" ductile iron pipe is sufficient for the design event.
See the conveyance capacity calculation on the following page.
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I f. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
Rational Method -De.-eloped Conditions
for: Aberdeen Ate Subdhision
Manning's Equation: Q = (1.49 )R'i' S 1/2 n
n= 0.014
Connrrance Canadtv
4-inclt 6-inclt S-inclt 10-inclt
Slope [It/It)
0.005 0.13 037 0.81 1.44
0.010 0.18 o.52 1.14 2.04
0.015 0.22 0.64 1.40 2.50
0.020 0.25 0.74 1.61 2.88
0.025 0.28 0.82 I.SO 3.23
0.030 0.31 0.90 1.97 3.53
0.035 0.33 0.98 2.13 3.82
0.040 035 1.04 228 4.08
0.045 038 1.11 2.42 433
0.050 0.40 1.17 2-55 4.56
0.055 0.42 1.22 2.67 4.78
0.860 0.43 1.28 2.79 5.00
0.065 0.45 133 2.91 5.20
0.070 0.47 us 3.02 5.40
0.075 0.48 1.43 3.12 5.59
0.880 0.50 1.48 3.22 5.77
0.085 0.52 l_j2 331 5.95
0.090 0.53 1.56 3.42 6.12
0.095 0.55 1.61 3.51 6.29
0.100 0.56 1.65 3.61 6.45
~ ~ Convevance Caoarnv
--<>-
ENGINEERING
250 4th A,,._ South
Suite 200
Edmoodo, WA 98020 Aberdeen Ave Subdivision
ENGINEERING
12-inch
234
332
4.06
4.69
5.14
5.74
620
6.63
7.03
7.41
7.7S
s .. 12
8.45
8.77
9.08
9.38
9.67
9.95
10.22
10.48
.,.
"""
Seu ... ,.,
VD
N.T.S.
'16037
.20
February 16, 2017
Section V, Page 2
,,,., 2,112017 ,,,.,
.........
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I 1. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
February 16, 2017
Section IV, Page 1
TIR Section IV -Flow Control and Water Quality Facility
Analysis and Design
TIR Section IV Summary:
Narrative
PART A: Existing Site Hydrology
PART B: Developed Site Hydrology
PART C: Performance Standards
PART D: Flow Contra! System
PART E: Water Quality System
WWHM2012 Report
PART A: EXISTING SITE HYDROLOGY
The 2012 Western Washington Hydrology Model (WWHM) was used to model flow control. Per the City
of Renton's Flow Control Application Map (Reference 11-A in the RSWDM), the site is within the Flow
Control Duration Standard (Forested Condition).
The predeveloped land coverage is as follows:
Pervious Areas
Forest, Flat, A/B:
Total:
PART B: DEVELOPED SITE HYDROLOGY
16,128 sf (0.370 ac)
16,128 sf (0.370 ac)
In the proposed condition, the existing lot will be subdivided into 2 lots and existing structures will be
demolished. Impervious areas were assumed for the proposed lots according to Section 3.2 of the
RSWDM since Lot 1 and Lot 2 will be developed in the future. Per Section 3.2, the assumed impervious
coverage "shall not be less than 4,000 sf per lot or the maximum impervious coverage permitted by
code Table 3.2.2.C, whichever is less." The maximum impervious coverage allowed per code for the
zoning (R-8) is 65%, or 3,689 sf and 5,135 sf for Lot 1 and Lot 2, respectively. The assumed impervious
coverage shall be 65% and the maximum building coverage shall be 50% for the purposes of this
hydrology model.
The assumed developed lot coverage is as follows:
Lot 1 Developed Lot Coverage
Landscaping, Flat, A/B:
Roof, Flat:
Driveway/Walkways. Flat:
Total:
C5
ENGINEERING
1,988 sf (0.045 ac)
2,838 sf (0.065 ac)
851 sf (0.020 ac)
5,677 sf (0.130 ac)
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8soo I t. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
Lot 2 Developed Lot Coverage
Landscaping, Flat, A/B:
Roof, Flat:
Driveway/Walkways, Flat. A/B:
Total:
Tract Developed Lot Coverage
Driveway, Flat. A/B:
Total:
2,768 sf (0.063 ac)
3,951 sf (0.091 ac)
1,184 sf (0.027 ac)
7,903 sf (0.181 ac)
2,581 sf (0.059 ac)
2,581 sf (0.059 ac)
February 16, 2017
Section IV, Page 2
The proposed Flow Control BMP is an Infiltration Trench per Section 5.2 of the 2016 KCSWDM. An
infiltration design rate of 7.35 in/hr was determined for the site (see Section VI for the geotechnical
report). The trench was sized to be 80'x5'x2' deep and will be sited in the access/utility tract. Surface
water will be directed from the roofs of Lots 1 and 2, and from the access/utility tract.
PART C: PERFORMANCE STANDARDS
1. Area-Specific Flow Control Facility standard:
The site is within the City of Renton's Flow Control Duration Standard (Forested Conditions).
2. Flow Control BMPs:
Flow Control BMP Implementation requirements were determined from Section 1.2.9.3.1 "Small
Subdivision and Urban Subdivision Projects BMP Requirements." BMPs for plat infrastructure
improvements (driveway tract) were evaluated per Section 1.2.9.3.2 "Small Road Improvement
and Urban Road Improvement Project BMP Requirements." BMPs for the future development of
the two individual lots were evaluated per Section 1.2.9.2.1 "Small Lot BMP Requirements."
3. Conveyance System Capacity Standards:
New pipe systems shall be designed with sufficient capacity to convey and contain (at minimum)
the 25-year peak flow, assuming developed conditions for onsite tributary areas and existing
conditions for any offsite tributary areas.
4. Water Quality Standard:
Storm water from pollution-generating impervious areas will be treated to meet Basic Water
Quality prior to infiltration because the site is located in a Zone 2 Aquifer Protection Area.
PART D: FLOW CONTROL SYSTEM
An infiltration trench is proposed to meet the flow control BMP requirement of this project. The trench
will be 80' x 5' x 2' deep and will be sited within the access/utility tract. The design infiltration rate used
was 7.35 in/hr per the geotechnical report found in Section VI. It was sized to fully infiltrate runoff from
the assumed roof areas of Lots 1 and 2, and from the proposed road surface of the access/utility tract.
BMPs must be implemented for 10% of the site/lot for sites/lots up to 11,000 sf per Section 1.2.9.2.1
"Small Lot BMP Requirements." The assumed roof area is 50% of each lot (see Part B), and should
therefore meet this requirement. Runoff from all of the impervious surfaces of the access/utility tract
cm
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I 1. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
February 16, 2017
Section IV, Page 3
will be infiltrated per the requirement that all target surfaces must be mitigated to the maximum extent
feasible from the list in Section 1.2.9.3.2 "Small Road Improvement and Urban Road Improvement
Projects BMP Requirements."
The project is exempt from the facility requirement of Core Requirement #3: Flow Control per Exception
#2 of Section 1.2.3.1.B of the 2016 KCSWDM because the 100-year peak flow is no more than 0.15 cfs
(when modeled using 15-minute time steps). Please see the WWHM summary. The model includes the
infiltration trench.
PART E: WATER QUALITY SYSTEM
A water quality system meeting Basic Water Quality was sized to treat runoff from pollution generating
impervious surfaces prior to infiltration because the site is in a Zone 2 Aquifer Protection Area.
A Stormfilter by Contech was sized based on the following information:
Total drainage area: 0.215 ac (not including roofs)
Impervious Drainage Area: 0.106 ac
Application (Residential? Commercial? Roadway?): Residential
WQ Flow (15 minute offline): 0.0094 cfs
WQ Flow (15 minute online): 0.017 cfs
Bypass Flow: 0.114 cfs (100-year peak flow rate)
Rim: 298.0
Outlet #1: 294.0 (to trench) 6"
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I t. 425.778.5536
www.cgengineering.com
WWHM2012
PROJECT REPORT
General Model Information
Project Name: Aberdeen Ave 02.02.17
Site Name: Aberdeen Ave Short Plat
Site Address: 1824 Aberdeen Ave NE
City: Renton
Report Date: 2/13/2017
Gage: Seatac
Data Start: 1948/10/01
Data End: 2009/09/30
Timestep: 15 Minute
Precip Scale: 1.00
Version: 2014/01/22
POC Thresholds
Low Flow Threshold for POC 1:
High Flow Threshold for POC1:
Aberdeen Ave 02.02.17
50 Percent of the 2 Year
50 Year
2/13/2017 3:50:26 PM Page 2
Landuse Basin Data
Predeveloped Land Use
Site
Bypass: No
Groundwater: No
Pervious Land Use Acres
AB, Forest, Flat 0.37
Pervious Total 0.37
Impervious Land Use Acres
Impervious Total 0
Basin Total 0.37
Element Flows To:
Surface lnterflow
Aberdeen Ave 02.02.17
Groundwater
2/13/2017 3:50:26 PM Page 3
Mitigated Land Use
Impervious Areas
Bypass: No
GroundWater: No
Pervious Land Use Acres
Pervious Total 0
Impervious Land Use Acres
ROOF TOPS FLAT 0.156
DRIVEWAYS FLAT 0.106
Impervious Total 0.262
Basin Total 0.262
Element Flows To:
Surface lnterflow Groundwater
Gravel Trench Bed 1 Gravel Trench Bed 1
Aberdeen Ave 02.02 17 2/13/2017 3:50:26 PM Page4
Lawn
Bypass: Yes
GroundWater: No
Pervious Land Use Acres
A B, Lawn, Flat 0.108
Pervious Total 0.108
Impervious Land Use Acres
Impervious Total 0
Basin Total 0.108
Element Flows To:
Surface lnterflow Groundwater
Aberdeen Ave 02 02.17 2/13/2017 3:50:26 PM Page 5
Routing Elements
Predeveloped Routing
Aberdeen Ave 02.02.17 2/13/2017 3:50:26 PM Page 6
Mitigated Routing
Gravel Trench Bed 1
Bottom Length:
Bottom Width:
Trench bottom slope 1:
Trench Left side slope O:
Trench right side slope 2:
Material thickness of first layer:
Pour Space of material for first layer:
Material thickness of second layer:
Pour Space of material for second layer:
Material thickness of third layer:
Pour Space of material for third layer:
Infiltration On
Infiltration rate:
Infiltration safety factor:
Total Volume Infiltrated (ac-ft):
Total Volume Through Riser (ac-ft):
Total Volume Through Facility (ac-ft):
Percent Infiltrated:
Discharge Structure
Riser Height: 1.8 ft.
Riser Diameter: 0 in.
Element Flows To:
Outlet 1 Outlet 2
Gravel Trench Bed Hydraulic Table
Stage(ft)
0 0000
0.0222
0.0444
0.0667
0.0889
0.1111
0. 1333
0.1556
0.1778
0.2000
0.2222
0.2444
0.2667
0.2889
0.3111
0.3333
0.3556
0.3778
0.4000
0.4222
0.4444
0.4667
0.4889
0.5111
0.5333
0.5556
Area(ac)
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
Volume(ac-ft)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0000
0.000
0.000
0.000
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
80.00 ft.
5.00 ft.
0.0001 To 1
0 To 1
0 To 1
2
0.3
0
0
0
0
7.35
1
27.748
0
27.748
100
Discharge(cfs) lnfilt(cfs)
0.000 0.000
0 000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0 000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0 000 0.068
0.000 0.068
0.000 0.068
0 000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0 000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
Aberdeen Ave 02.02.17 2/13/2017 3:50:26 PM Page 7
0.5778 0.009 0.001 0.000 0.068
0.6000 0.009 0.001 0.000 0.068
0.6222 0.009 0.001 0.000 0.068
0.6444 0.009 0.001 0.000 0.068
0.6667 0.009 0.001 0.000 0.068
0.6889 0.009 0.001 0 000 0.068
0.7111 0.009 0.002 0.000 0.068
0.7333 0.009 0.002 0.000 0.068
0.7556 0.009 0.002 0.000 0.068
0.7778 0.009 0.002 0.000 0.068
0.8000 0.009 0.002 0.000 0.068
0.8222 0.009 0.002 0.000 0.068
0.8444 0.009 0.002 0.000 0.068
0.8667 0.009 0.002 0.000 0.068
0.8889 0.009 0.002 0 000 0.068
0.9111 0.009 0.002 0.000 0.068
0.9333 0.009 0.002 0.000 0.068
0.9556 0.009 0.002 0.000 0.068
0.9778 0.009 0.002 0.000 0.068
1.0000 0.009 0.002 0 000 0.068
1.0222 0.009 0.002 0.000 0.068
1.0444 0.009 0.002 0.000 0.068
1.0667 0.009 0.002 0.000 0.068
1.0889 0.009 0.003 0000 0.068
1.1111 0.009 0.003 0.000 0.068
1.1333 0.009 0.003 0.000 0.068
1.1556 0.009 0.003 0.000 0.068
1.1778 0.009 0.003 0000 0.068
1.2000 0.009 0.003 0.000 0.068
1.2222 0.009 0.003 0.000 0.068
1.2444 0.009 0.003 0.000 0.068
1.2667 0.009 0.003 0000 0.068
1.2889 0.009 0.003 0.000 0.068
1.3111 0.009 0.003 0.000 0.068
1.3333 0.009 0.003 0.000 0.068
1.3556 0.009 0.003 0000 0.068
1.3778 0.009 0.003 0.000 0.068
1.4000 0.009 0.003 0.000 0.068
1.4222 0.009 0.003 0.000 0.068
1.4444 0.009 0.004 0.000 0.068
1.4667 0.009 0.004 0.000 0.068
1.4889 0.009 0.004 0.000 0.068
1.5111 0.009 0.004 0.000 0.068
1.5333 0.009 0.004 0.000 0.068
1.5556 0.009 0.004 0.000 0.068
1.5778 0.009 0.004 0.000 0.068
1.6000 0.009 0.004 0.000 0.068
1.6222 0.009 0.004 0.000 0.068
1.6444 0.009 0.004 0.000 0.068
1.6667 0.009 0.004 0 000 0.068
1.6889 0.009 0.004 0.000 0.068
1.7111 0.009 0.004 0.000 0.068
1.7333 0.009 0.004 0.000 0.068
1.7556 0.009 0.004 0.000 0.068
1.7778 0.009 0.004 0.000 0.068
1.8000 0.009 0.005 0.000 0.068
1.8222 0.009 0.005 0.000 0.068
1.8444 0.009 0.005 0.000 0.068
Aberdeen Ave 02.02.17 2/13/2017 3:50:26 PM Page 8
..
1.8667 0.009 0.005 0.000 0.068
1.8889 0.009 0.005 0.000 0.068
1.9111 0.009 0.005 0.000 0.068
1.9333 0.009 0.005 0.000 0.068
1.9556 0.009 0.005 0.000 0.068
1.9778 0.009 0.005 0.000 0.068
2.0000 0.009 0.005 0.000 0.068
Aberdeen Ave 02.02.17 2/13/2017 3:50:26 PM Page 9
-
Analysis Results
POC 1
0.00
• , 000
£
~ 0.00
0
J
I
. . . IL ooo ~
o.oo,[{-5 l[{-4 11.l:·3 1CE·2 lCE·l
'" '"
'"' ... -
,,,.,,,.-
+ + +++:;-++++ + •
·~· .. --.
rn ,oo 00+---------------1,.,
P•rO<lilont Tlm-E><o--~lng
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area: 0.37
Total Impervious Area: 0
Mitigated Landuse Totals for POC #1
Total Pervious Area: 0.108
Total Impervious Area: 0.262
Flow Frequency Method: Log Pearson Type Ill 178
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.000303
5 year 0.000395
10 year 0.000459
25 year 0.000544
50 year 0.00061
100 year 0.000679
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.000678
5 year 0.002079
1 O year 0.003734
25 year 0.006974
50 year 0.01044
100 year 0.015007
< 0.15 cfs increase in the 100-yr storm.
==> Flow control facility not required.
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.000 0.001
1950 0.001 0.010
1951 0.001 0.003
1952 0.000 0.000
1953 0.000 0.000
1954 0.000 0.002
1955 0.000 0.001
1956 0.000 0.004
1957 0.000 0.000
1958 0.000 0.000
Aberdeen Ave 02.02.17 2/1312017 3:50:26 PM Page 10
1959 0.000 0.001
1960 0.000 0.003
1961 0000 0.002
1962 0.000 0.000
1963 0.000 0.001
1964 0.000 0.003
1965 0.000 0.001
1966 0.000 0000
1967 0.000 0.008
1968 0.000 0.002
1969 0.000 0.001
1970 0 000 0.000
1971 0.000 0.000
1972 0.002 0.007
1973 0.000 0.000
1974 0000 0.001
1975 0.000 0.001
1976 0.000 0.002
1977 0.000 0.000
1978 0.000 0.000
1979 0000 0 000
1980 0.000 0.000
1981 0.000 0.000
1982 0.000 0.002
1983 0.000 0.001
1984 0.000 0.000
1985 0.000 0.000
1986 0.000 0.001
1987 0000 0.002
1988 0.000 0.000
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.0015 0.0095
2 0.0006 0.0079
3 0.0006 0.0069
4 0.0003 0.0043
5 0.0003 0.0032
6 0.0003 0.0027
7 0.0003 0.0025
8 0.0003 0.0021
9 0.0003 0.0021
10 0.0003 0.0020
11 0.0003 0.0019
12 0.0003 0.0017
13 0.0003 0.0015
14 0.0003 0.0014
15 0.0003 0.0013
16 0.0003 0.0010
17 0.0003 0.0008
18 0.0003 0.0008
19 0.0003 0.0008
20 0.0003 0.0006
21 0.0003 0.0006
22 0.0003 0.0005
23 0.0003 0.0005
24 0.0003 0.0004
Aberdeen Ave 02.02.17 211312017 3:50:47 PM Page 11
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
0.0003
0.0003
0.0003
0.0003
0.0003
0.0003
0.0003
0.0003
0.0003
0.0003
0.0003
0.0003
0.0003
0.0003
0.0002
0.0002
Aberdeen Ave 02.02.17
0.0004
0.0004
0.0004
0.0004
0.0004
0.0003
0.0003
0.0002
0.0002
0.0001
0.0001
0.0001
0.0001
0.0001
0.0001
0.0001
2/13/2017 3:50:47 PM Page 12
Model Default Modifications
Total of O changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
Aberdeen Ave 02.02.17 2/13/2017 3:51 :02 PM Page 17
Appendix
Predeve/oped Schematic
.--"A.,I site
•. 37ac
Aberdeen Ave 02 .02 .17 2/13/201 7 3:51 :02 P M Page 18
-
Mitigated Schematic
""~11a. lmpeni •· ~:I Lawn
-reas .lil.f·1 1ac
pl ~ ~
1 __:;ravel
1~1 rrrench Bed 1 --.
'
Aberd ee n Ave 02 .02. 17 2/13/2017 3 :51 02 PM Page 19
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright© by: Clear Creek Solutions, Inc. 2005-2013; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1 (866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
Aberdeen Ave 02.02.17 2/13/2017 3:51:03 PM Page 40
Aberdeen Ave Subdivision 16037.20
Technical Information Report
February 16, 2017
Section VI, Page 1
TIR Section VI -Special Reports and Studies
TIR Section VI Summary:
Narrative
Please refer to the following reports submitted with the application:
1. Geotechnical Engineering Evaluation by Nelson Geotechnical Associates, Inc., dated October 17,
2016.
2. Supplemental Memorandum to the Geotechnical Engineering Evaluation by Nelson
Geotechnical Associates, Inc., dated February 10, 2017.
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8soo I t. 425.778.5536
www.cgengineering.com
...,-------------
MainOflice
17311 -135 111 Ave :-IE, A-500
Wooclinville, WA 98072
(425) 486-1669 · FAX (425) 481-2510
October 17, 2016
Mr. Curran Kwan
Prime Metropolis Properties, Inc.
950 Taraval Street
San Francisco, California 94116
NELSON GEOTECHNICAL
ASSOCIATES, INC.
GEOTECHNICAL ENGINEERS 8c GEOLOGISTS
f:nginccring-Gcolog,y Branch
5526 lndw;try Lune, /12
East Wenatchee, WA 98302
(509) 665-7696 · F,\X (509) 665-7692
Geotechnical Engineering Eva! uation
Aberdeen Avenue Short Plat and Infiltration
1824 Aberdeen Avenue
Renton, Washington
NGA Job No. 971516
Dear Mr. Kwan:
We are pleased to submit the attached repo1t titled "Geotechnical Engineering Evaluation -Aberdeen
Avenue Short Plat and Infiltration -1824 Aberdeen Avenue -Renton, Washington." This report
summarizes our observations of the existing surface and subsurface conditions within the site, and
provides general recommendations for the proposed site development. Our services were completed in
general accordance with the proposal signed by you on September 20, 2016.
The site is generally situated on level to gently sloping ground that descends from the east to the west.
The site is currently occupied by an existing single-family residence and attached carport within the
western portion of the prope11y, a detached garage, and a detached shop building in the south-central and
eastern portions of the property, respectively. We understand that the proposed development includes
removing the existing site structures and subdividing the property to create new western and eastern
parcels. We also understand that a single-family residence and associated pavement and underground
utilities will be constructed within each new parcel. Specific grading and stormwater plans were not
available at the time this letter was prepared. However, we understand that stormwater is likely to be
directed into on-site infiltration systems, if feasible. The City of Renton uses the 2009 King County
Surface Water Design Manual to dete1mine the design infiltration rate. On-site infiltration testing is
required to determine the suitability of stormwater infiltration. For our use in preparing this report, we
have been provided with a preliminary plat map titled "Aberdeen Ave. Subdivision," dated March 24,
2016 and prepared by CG Engineering, Inc., showing the existing and proposed site conditions along with
proposed infiltration test locations.
We monitored the excavation of four test pits and two infiltration test pits at the site on October 4, 2016.
Our explorations indicated that the site is generally underlain by competent native glacial soils, with
localized undocumented fill soils encountered up to 4.0 feet in depth. We have concluded that the site is
generally compatible with the planned development. We have recommended that any undocumented fill
soils be over-excavated and that the new structures be founded on the underlying medium dense or better
Geotechnical Engineering Evaluation
Aberdeen Avenue Short Plat and Infiltration
Renton, Washington
NGA File No. 971516
October 17, 2016
Summary -Page 2
native soils or structural fill extending to these soils for bearing capacity and settlement considerations.
These soils should generally be encountered approximately one to four feet below the existing ground
surface, based on our explorations. However, deeper areas of loose soil and/or undocumented fill could
also exist within unexplored areas of the site.
We also performed on-site infiltration testing based on the 2009 King County Smface Water Design
Manual. Based on our field testing, the native granular glacial soils encountered at depth within our
explorations within the propetty are suitable for on-site stormwater infiltration. In the attached report, we
have provided recommendations for infiltration system design and installation. We have also included
recommendations for general site grading, foundation and slab support, and drainage.
It has been a pleasure to provide service to you on this project. Please contact us if you have any
questions regarding this report or require futther information.
Sincerely,
NELSON GEO TECHNICAL ASSOC/A TES, INC.
Khaled M. Shawish, PE
Principal
TABLE OF CONTENTS
INTRODUCTION .......................................................................................................................... I
SCOPE ............................................................................................................................................ I
SITE CONDITIONS ...................................................................................................................... 2
Surface Conditions.................. . ....... 2
Subsurface Conditions .............................................................................................................. 2
Hydrologic Conditions .............................................................................................................. 3
SENSITIVE AREA EVALUATION ............................................................................................ 3
Seismic Hazard................... . ................... 3
Erosion Hazard ......................................................................................................................... 4
CONCLUSIONS AND RECOMMENDATIONS ....................................................................... 4
General ................................ . . ... 4
Erosion Control ........................................................................................................................ 5
Site Preparation and Grading .................................................................................................... 5
Temporary and Permanent Slopes ............................................................................................ 6
Foundations .............................................................................................................................. 7
Retaining Walls ........................................................................................................................ 8
Structural Fill ............................................................................................................................ 9
Slab-on-Grade ......................................................................................................................... I 0
Pavements ............................................................................................................................... 10
Utilities ................................................................................................................................... 11
Site Drainage .......................................................................................................................... 11
CONSTRUCTION MONITORING .......................................................................................... 13
USE OF THIS REPORT ............................................................................................................. 13
LIST OF FIGURES
Figure 1 -Vicinity Map
Figure 2 -Site Plan
Figure 3 -Soil Classification Chart
Figures 4 and 5 -Test Pit Logs
NELSON GEOTECHNICAL ASSOCIATES, INC.
INTRODUCTION
Geotechnical Engineering Evaluation
Aberdeen A venue Short Plat and Infiltration
1824 Aberdeen A venue
Renton, Washington
This report presents the results of our geotechnical engineering investigation and evaluation of the
planned Aberdeen Avenue Residential Development project in Renton, Washington. The project site is
located at 1824 Aberdeen Avenue in Renton, Washington, as shown on the Vicinity Map in figure 1.
The purpose of this study is to explore and characterize the site's smface and subsurface conditions and to
provide geotechnical recommendations for the planned site development. For our use in preparing this
report, we have been provided with a preliminary plat map titled "Aberdeen Ave. Subdivision," dated
March 24, 2016 and prepared by CG Engineering, Inc.
The site is relatively level to gently sloping from the east to the west and is currently occupied by a
single-family residence structure and attached carpo1t, as well as, two detached shop buildings in the
south-central and eastern portions of the site. The proposed development plan consists of demolishing the
existing structures and subdividing the current property into two, western and eastern parcels. We
understand that stormwater is likely to be directed into on-site infiltration systems, if feasible. The
existing site layout and the approximate locations of our explorations are shown on the Site Plan in Figure
2.
SCOPE
The purpose of this study is to explore and characterize the site surface and subsurface conditions, and
provide general recommendations for site development. Based on our understanding of the planned
development and site conditions, the services to be provided by NGA are to:
1. Review available soil and geologic maps of the area.
2. Explore the subsurface soil and groundwater conditions within the site with trackhoe
excavated test pits. Trackhoe was subcontracted by NGA.
3. Provide recommendations for emthwork, foundation support, and slabs-on-grade.
4. Provide recommendations for temporary and permanent slopes.
5. Provide recommendations for pavement subgrade.
6. Provide recommendations for site drainage and erosion control.
7. Perform on-site infiltration testing as required.
NELSON GEOTECHNICAL ASSOCIATES, INC.
Geotechnical Engineering Evaluation
Aberdeen Avenue Short Plat and Infiltration
Renton, Washington
8. Perform grain-size sieve analysis on soil samples, if necessary.
NGA File No. 971516
October 17, 2016
Page 2
9. Provide estimates of the infiltration capacity of the soils based on the 2009 King County
Surface Water Design Manual.
I 0. Provide recommendations for infiltration system installation.
11. Document the results of our findings, conclusions, and recommendations in a written
geotechnical report.
SITE CONDITIONS
Surface Conditions
The site consists of a rectangular-shaped parcel covering approximately 0.37-acres. The site is bounded
to the north, south, and east by existing residential properties and to the west by Aberdeen Avenue. An
existing single-family residential structure and attached carport are located in the western portion of the
property. There are two detached garage buildings within the south-central and eastern po11ions of the
site. The site topography is relatively level to gently sloping from the east to the west. Vegetation within
the site generally consists of grass, underbrush, and scattered trees. We did not observe surface water on
the site during our visit on October 5, 2016.
Subsurface Conditions
Geology: The geologic units for this site are shown on Geologic map of surficial deposits in the Seattle
30' by 60' quadrangle, Washington by Yount, J.C., Minard, J.P., and Dembroff, G.R., (USGS, 1993). The
site is mapped as glacial recessional outwash (Qvr). The recessional outwash deposits are described as a
poorly to moderately so11ed, stratified mixture of sands and gravels with minor amounts of silt. Our
explorations within the prope11y generally encountered fine to medium sand with silt consistent with the
description of recessional outwash deposits at depth.
Explorations: The subsurface conditions within the site were explored on October 4, 2016 by excavating
four test pits and two infiltration test pits to depths ranging from 3.0 to l 0.0 feet below the existing
ground surface using a mini-trackhoe. The approximate locations of our explorations are shown on the
Schematic Site Plan in Figure 2. A geologist from NGA was present during the explorations, examined
the soils and geologic conditions encountered, obtained samples of the different soil types, and
maintained logs of the test pits.
NELSON GEOTECHNICAL ASSOC/A TES, INC.
Geotechnical Engineering Evaluation
Aberdeen Avenue Short Plat and Infiltration
Renton, Washington
NGA File No. 971516
October 17, 2016
Page 3
The soils were visually classified in general accordance with the Unified Soil Classification System,
presented in Figure 3. The logs of our test pits are attached to this report and are presented as Figures 4
and 5. We present a brief summary of the subsurface conditions in the following paragraphs. For a
detailed description of the subsurface conditions, the logs of the test pits should be reviewed.
Within Test Pit 2 through 3 and Infiltration Pit 1 through 2 we encountered 0.5 to 1.5 of grass and
surficial topsoil. Underlying the topsoil we generally encountered medium dense or better, light brown to
gray brown, fine to medium sand with gravel, and minor amounts of silt, which we interpreted as native
recessional outwash deposits. These explorations terminated within the native recessional outwash
deposits at depths in the range of 8.0 to 9.5 feet below the existing ground surface.
Within Test Pit 1 and Test Pit 4 we encountered 0.6 to 1.5 feet of grass and surficial topsoil underlain by
2.2 to 3.4 feet of loose to medium dense, fine to medium sand with silt, intermixed with concrete rubble
that we interpreted as undocumented fill soils. Underlying the fill in Test Pit 1, we encountered medium
dense to dense, light-brown to gray-brown, fine to medium sand with silt and trace gravel that we
interpreted as native recessional outwash deposits. Test Pit 4 was terminated at a concrete drain pipe
within undocumented fill soils at 3.0 feet below the existing ground surface, while Test Pit 1 was
terminated in native recessional outwash soils at approximately 10.0 feet below the existing ground
surface.
Hydrologic Conditions
Groundwater seepage was not encountered in our explorations. If groundwater seepage occurs on this
site, we would interpret the water to be perched water. Perched water occurs when surface water
infiltrates through less dense, more permeable soils and accumulates on top of a relatively low
permeability material. Perched water does not represent a regional groundwater "table" within the upper
soil horizons. Perched water tends to vary spatially and is dependent upon the amount of rainfall. We
would expect the amount of perched groundwater to decrease during drier times of the year and increase
during wetter periods.
SENSITIVE AREA EVALUATION
Seismic Hazard
We reviewed the 2015 International Building Code (!BC) for seismic site classification for this project.
Since medium dense or better glacial soils were generally encountered underlying the site at depth, the
site conditions best fit the !BC description for Site Class D.
NELSON GEOTECHNICAL ASSOC/A TES, INC.
Geotechnical Engineering Evaluation
Aberdeen Avenue Short Plat and Infiltration
Renton, Washington
NGA File No. 971516
October 17, 2016
Page 4
Hazards associated with seismic activity include liquefaction potential and amplification of ground
motion. Liquefaction is caused by a rise in pore pressures in a loose, fine sand deposit beneath the
groundwater table. It is our opinion that the competent native glacial soils interpreted to underlie the site
have a low potential for liquefaction or amplification of ground motion.
Erosion Hazard
The criteria used for determination of the erosion hazard for affected areas include soil type, slope
gradient, vegetation cover, and groundwater conditions. The erosion sensitivity is related to vegetative
cover and the specific surface soil types, which are related to the underlying geologic soil units. The Soil
Survey of King County Area. Washington, by the Soil Conservation Service (SCS) lists the soils within
the project area as Indianola Loamy Sand, 5 to 15 percent slopes. The erosion hazard for these soils is
listed as slight. It is our opinion that the site would have a slight erosion hazard for areas where the soils
are exposed. It is also our opinion that the erosion hazard for site soils should be low in areas where
vegetation is not disturbed.
CONCLUSIONS AND RECOMMENDATIONS
General
It is our opinion from a geotechnical standpoint that the site is generally compatible with the planned
development. Our explorations indicated that the site is generally underlain by competent native glacial
soils at depth. However, our explorations within the central and eastern portion of the property
encountered approximately 3.0 to 4.0 feet of unsuitable undocumented fill soils. The native glacial soils
encountered at depth should provide adequate support for foundation, slab, and pavement loads. We
recommend that the planned structures be designed utilizing shallow foundations. Footings should extend
through any loose soil or undocumented fill soils and be founded on the underlying medium dense or
better native soil, or structural fill extending to these soils. The native medium dense or better soils
should typically be encountered approximately one to four feet below the existing surface, based on our
explorations. We should note that localized areas of deeper unsuitable soils and/or undocumented fill
could be encountered at this site. This condition would require additional excavations in foundation, slab,
and pavement areas to remove the unsuitable soils.
It is our opinion that the native granular glacial soils encountered within the prope11y are suitable for on-
site infiltration systems. The subsurface soils encountered at depth are generally fine to medium sands
with varying amounts of silt. We also did not observe groundwater in our explorations to the depths
explored. We recommend on-site infiltration systems be founded in native recessional outwash deposits.
NELSON GEOTECHN/CAL ASSOCIATES, INC.
Geotechnical Engineering Evaluation
Aberdeen Avenue Short Plat and Infiltration
Renton, Washington
NGA File No. 971516
October 17, 2016
Page 5
The storm water management system should be designed in accordance with 2009 King County Surface
Water Design Manual. This is frn1her discussed in the Stormwatcr Infiltration subsection of this
report.
The surficial soils encountered on this site are considered moisture-sensitive and may disturb easily when
wet. We recommend that construction take place during the drier summer months, if possible. If
construction is to take place during wet weather, the soils may disturb and additional expenses and delays
may be expected due to the wet conditions. Additional expenses could include the need for placing a
blanket of rock spalls to protect exposed subgrades and construction traffic areas. Some of the native on-
site soils may be suitable for use as structural fill depending on the moisture content of the soil during
construction. This will depend on the moisture content of the soils at the time of construction. NGA
should be retained to determine if the on-site soils can be used as structural fill material during
construction.
Erosion Control
The erosion hazard for the on-site soils is interpreted to be slight for exposed soils, but actual erosion
potential will be dependent on how the site is graded and how water is allowed to concentrate. Best
Management Practices (BMPs) should be used to control erosion. Areas disturbed during construction
should be protected from erosion. Erosion control measures may include dive1ting surface water away
from the stripped or disturbed areas. Silt fences and/or straw bales should be erected to prevent muddy
water from leaving the site. Disturbed areas should be planted as soon as practical and the vegetation
should be maintained until it is established. The erosion potential of areas not stripped of vegetation
should be low.
Site Preparation and Grading
After erosion control measures are implemented, site preparation should consist of stripping the topsoil,
loose soils and/or undocumented fill from foundation, slab, pavement areas, and other structural areas, to
expose medium dense or better native soils. The stripped soil should be removed from the site or
stockpiled for later use as a landscaping fill. Based on our observations, we anticipate stripping depths of
approximately one to four feet across the site. It should be noted that additional stripping may be required
if areas of undocumented fill and/or loose soil are encountered in unexplored areas of the site. Specific
plans for protecting existing structures, driveway, and utilities should be devised during the planning
phase of the project and should be made clear to contractors during the bidding phase.
NELSON GEOTECHNICAL ASSOCIATES, INC.
Geotechnical Engineering Evaluation
Aberdeen Avenue Short Plat and Infiltration
Renton, Washington
NGA File No. 971516
October 17, 2016
Page 6
After site stripping, if the exposed subgrade is loose, it should be compacted to a non-yielding condition
and then proof-rolled with a heavy rubber-tired piece of equipment. Areas observed to pump or weave
during the proof-roll test should be reworked to structural fill specifications or over-excavated and
replaced with properly compacted structural fill or rock spalls. If loose soils are encountered in the
pavement areas, the loose soils should be removed and replaced with rock spalls or granular structural fill.
If significant surface water flow is encountered during construction, this flow should be diverted around
areas to be developed, and the exposed subgrades should be maintained in a semi-dry condition.
If wet conditions are encountered, alternative site stripping and grading techniques might be necessary.
These could include using large excavators equipped with wide tracks and a smooth bucket to complete
site grading and covering exposed subgrade with a layer of crushed rock for protection. If wet conditions
are encountered or construction is attempted in wet weather, the subgrade should not be compacted as this
could cause further subgrade disturbance. In wet conditions it may be necessary to cover the exposed
subgrade with a layer of crushed rock as soon as it is exposed to protect the moisture sensitive soils from
disturbance by machine or foot traffic during construction. The prepared subgrade should be protected
from construction traffic and surface water should be divetted around areas of prepared subgrade.
The site soils are considered to be moisture-sensitive and may disturb when wet. We recommend that
construction take place during the drier summer months if possible. However, if construction takes place
during the wet season, additional expenses and delays should be expected due to the wet conditions.
Additional expenses could include the need for placing a blanket of rock spalls on exposed subgrades,
construction traffic areas, and paved areas prior to placing structural fill. Wet weather grading will also
require additional erosion control and site drainage measures. Some of the on-site soils may be suitable
for use as structural fill, depending on the moisture content of the soil at the time of construction. NGA
should be retained to evaluate the suitability of all on-site and imported structural fill material during
construction.
Temporary and Permanent Slopes
Temporary cut slope stability is a function of many factors, including the type and consistency of soils,
depth of the cut, surcharge loads adjacent to the excavation, length of time a cut remains open, and the
presence of surface or groundwater. It is exceedingly difficult under these variable conditions to estimate
a stable, temporary, cut slope angle. Therefore, it should be the responsibility of the contractor to
maintain safe slope configurations at all times as indicated in OSHA guidelines for cut slopes.
NELSON GEOTECHNICAL ASSOC/A TES, INC.
Gcotcchnlcal Engineering Evaluation
Aberdeen Avenue Shoti Plat and Infiltration
Renton, Washington
NGA File No. 971516
October 17, 2016
Page 7
The following information is provided solely for the benefit of the owner and other design consultants and
should not be construed to imply that Nelson Geotechnical Associates, Inc. assumes responsibility for job
site safety. Job site safety is the sole responsibility of the project contractor.
For planning purposes, we recommend that temporary cuts in the upper undocumented fill soils be no
steeper than 2 Horizontal to 1 Vertical (2H: IV). Temporary cuts in the competent native glacial soils at
depth should be no steeper than l.5H:1V. If significant groundwater seepage or surface water flow were
encountered, we would expect that flatter inclinations would be necessary. We recommend that cut
slopes be protected from erosion. The slope protection measures may include covering cut slopes with
plastic sheeting and diverting surface runoff away from the top of cut slopes. We do not recommend
vertical slopes for cuts deeper than four feet, if worker access is necessary. We recommend that cut slope
heights and inclinations conform to appropriate OSHA/WISHA regulations. Temporary shoring may be
needed where these recommended inclinations cannot be met due to existing structures or property
boundaries.
Permanent cut and fill slopes should be no steeper than 2H: l V. However, flatter inclinations may be
required in areas where loose soils are encountered. Permanent slopes should be vegetated and the
vegetative cover maintained until established.
Foundations
Conventional shallow spread foundations should be placed on medium dense or better native soils, or be
supported on structural fill or rock spalls extending to those soils. Medium dense soils should be
encountered approximately one to four feet below ground surface based on our explorations. Where
undocumented fill or less dense soils are encountered at footing bearing elevation, the subgrade should be
over-excavated to expose suitable bearing soil. The over-excavation may be filled with structural fill, or
the footing may be extended down to the competent native soils. If footings are supported on structural
fill, the fill zone should extend outside the edges of the footing a distance equal to one half of the depth of
the over-excavation below the bottom of the footing.
Footings should extend at least 18 inches below the lowest adjacent finished ground surface for frost
protection and bearing capacity considerations. Foundations should be designed in accordance with the
20 I 5 !BC. Footing widths should be based on the anticipated loads and allowable soil bearing pressure.
Water should not be allowed to accumulate in footing trenches. All loose or disturbed soil should be
removed from the foundation excavation p1ior to placing concrete.
NELSON GEOTECHNICAL ASSOC/A TES, INC.
. ,
Geotechnical Engineering Evaluation
Aberdeen A venue Short Plat and Infiltration
Renton, Washington
NGA File No. 971516
October 17, 2016
Page 8
For foundations constructed as outlined above, we recommend an allowable design bearing pressure of
not more than 2,000 pounds per square foot (psf) be used for the design of footings founded on the
medium dense or better native soils or structural fill extending to the competent native material. The
foundation bearing soil should be evaluated by a representative of NGA. We should be consulted if
higher bearing pressures are needed. Current !BC guidelines should be used when considering increased
allowable bearing pressure for short-term transitoty wind or seismic loads. Potential foundation
settlement using the recommended allowable bearing pressure is estimated to be less than !-inch total and
Yi-inch differential between adjacent footings or across a distance of about 20 feet, based on our
experience with similar projects.
Lateral loads may be resisted by friction on the base of the footing and passive resistance against the
subsurface portions of the foundation. A coefficient of friction of 0.35 may be used to calculate the base
friction and should be applied to the vertical dead load only. Passive resistance may be calculated as a
triangular equivalent fluid pressure distribution. An equivalent fluid density of 200 pounds per cubic foot
(pct) should be used for passive resistance design for a level ground surface adjacent to the footing. This
level surface should extend a distance equal to at least three times the footing depth. These recommended
values incorporate safety factors of 1.5 and 2.0 applied to the estimated ultimate values for frictional and
passive resistance, respectively. To achieve this value of passive resistance, the foundations should be
poured "neat" against the native medium dense soils or compacted fill should be used as backfill against
the front of the footing. We recommend that the upper one foot of soil be neglected when calculating the
passive resistance.
Retaining Walls
Specific grading plans for this project were not available at the time this report was prepared, but
retaining walls may be incorporated into project plans. In general, the lateral pressure acting on
subsurface retaining walls is dependent on the nature and density of the soil behind the wall, the amount
of lateral wall movement which can occur as backfill is placed, wall drainage conditions, and the
inclination of the backfill. For walls that are free to yield at the top at least one thousandth of the height
of the wall (active condition), soil pressures will be less than if movement is limited by such factors as
wall stiffness or bracing (at-rest condition). We recommend that walls supporting horizontal backfill and
not subjected to hydrostatic forces, be designed using a triangular earth pressure distribution equivalent to
that exerted by a fluid with a density of 35 pcf for yielding (active condition) walls, and 55 pcf for non-
yielding (at-rest condition) walls.
NELSON GEOTECHNICAL ASSOCIATES, INC .
Geotecbnical Engineering Evaluation
Aberdeen Avenue Short Plat and Infiltration
Renton, Washington
NGA File No. 971516
October 17, 2016
Page 9
-----------------
These recommended lateral earth pressures are for a drained granular backfill and are based on the
assumption of a horizontal ground surface behind the wall for a distance of at least the subsurface height
of the wall, and do not account for surcharge loads. Additional lateral ea1ih pressures should be
considered for surcharge loads acting adjacent to subsurface walls and within a distance equal to the
subsurface height of the wall. This would include the effects of surcharges such as traffic loads, floor slab
loads, slopes, or other surface loads. We could consult with the structural engineer regarding additional
loads on retaining walls during final design, if needed.
The lateral pressures on walls may be resisted by friction between the foundation and subgrade soil, and
by passive resistance acting on the below-grade portion of the foundation. Recommendations for
frictional and passive resistance to lateral loads are presented in the Foundations subsection of this
report.
All wall backfill should be well compacted as outlined in the Structural Fill subsection of this report.
Care should be taken to prevent the buildup of excess lateral soil pressures due to over-compaction of the
wall backfill. This can be accomplished by placing wall backfill in 8-inch loose lifts and compacting the
backfill with small, hand-operated compactors within a distance behind the wall equal to at least one-half
the height of the wall. The thickness of the loose lifts should be reduced to accommodate the lower
compactive energy of the hand-operated equipment. The recommended level of compaction should still
be maintained.
Permanent drainage systems should be installed for retaining walls. Recommendations for these systems
are found in the Subsurface Drainage subsection of this report. We recommend that we be retained to
evaluate the proposed wall drain backfill material and observe installation of the drainage systems.
Structural Fill
General: Fill placed beneath foundations, pavement, or other settlement-sensitive structures should be
placed as structural fill. Structural fill, by definition, is placed in accordance with prescribed methods and
standards, and is monitored by an experienced geotechnical professional or soils technician. Field
monitoring procedures would include the performance of a representative number of in-place density tests
to document the attainment of the desired degree of relative compaction. The area to receive the fill
should be suitably prepared as described in the Site Preparation and Grading subsection prior to
beginning fill placement.
NELSON GEOTECHNICAL ASSOC/A TES, INC.
Geotechnical Engineering Evaluation
Aberdeen Avenue Sho1t Plat and Infiltration
Renton, Washington
NGA File No. 971516
October 17, 2016
Page 10
-----------------------·-----~-------------------
Materials: Structural fill should consist of a good quality, granular soil, free of organics and other
deleterious material, and be well graded to a maximum size of about three inches. All-weather fill should
contain no more than five-percent fines (soil finer than U.S. No. 200 sieve, based on that fraction passing
the U.S. 3/4-inch sieve). Some of the more granular on-site soils may be suitable for use as structural fill
depending on the moisture content of the soil during construction. We should be retained to evaluate all
proposed structural fill material prior to placement.
Fill Placement: Following subgrade preparation, placement of structural fill may proceed. All filling
should be accomplished in uniform lifts up to eight inches thick. Each lift should be spread evenly and be
thoroughly compacted prior to placement of subsequent lifts. All structural fill underlying building areas
and pavement subgrade should be compacted to a minimum of 95 percent of its maximum dry density.
Maximum dry density, in this repo1i, refers to that density as determined by the ASTM D-1557
Compaction Test procedure. The moisture content of the soils to be compacted should be within about
two percent of optimum so that a readily compactable condition exists. It may be necessary to over-
excavate and remove wet soils in cases where drying to a compactable condition is not feasible. All
compaction should be accomplished by equipment of a type and size sufficient to attain the desired degree
of compaction.
Slab-on-Grade
Slabs-on-grade should be supported on subgrade soils prepared as described in the Site Preparation and
Grading subsection of this report. We recommend that all floor slabs be underlain by at least six inches
of free-draining gravel with less than three percent by weight of the material passing Sieve #200 for use
as a capillary break. We recommend that the capillary break be hydraulically connected to the footing
drain system to allow free drainage from under the slab. A suitable vapor barrier, such as heavy plastic
sheeting (6-mil minimum), should be placed over the capillary break material. An additional 2-inch-thick
moist sand layer may be used to cover the vapor baiTier. This sand layer may be used to protect the vapor
barrier membrane and to aid in curing the concrete.
Pavements
Pavement subgrade preparation and structural filling where required, should be completed as
recommended in the Site Preparation and Grading and Structural Fill subsections of this report. The
pavement subgrade should be proof-rolled with a heavy, rubber-tired piece of equipment, to identify soft
or yielding areas that require repair. The pavement section should be underlain by a minimum of six
NELSON GEOTECHNICAL ASSOCIATES, INC.
Geotechnical Engineering Evaluation
Aberdeen Avenue Short Plat and Infiltration
Renton, Washington
NGA File No. 971516
October 17, 2016
Page 11
---------------·------------------------------------------------------~------------
inches of clean granular pit run or crushed rock. We should be retained to observe the proof-rolling and
recommend repairs prior to placement of the asphalt or hard surfaces.
Utilities
We recommend that underground utilities be bedded with a minimum 12 inches of pea gravel prior to
backfilling the trench with on-site or imported material. Trenches within settlement sensitive areas
should be compacted to 95% of the modified proctor as described in the Structural Fill subsection of this
report. Trenches located in non-structural areas should be compacted to a minimum 90% of the
maximum dry density.
Site Drainage
Infiltration: It is our opinion that the subsurface soils within the site are suitable for typical stormwater
infiltration. We recommend that any infiltration systems within this property be designed utilizing the
recommended long-term design infiltration rate provided below.
We conducted two on-site infiltration tests within the central and eastern portion of the property based on
the 2009 King County Surface Water Design Manual to determine a long-term design infiltration rate for
the on-site infiltration systems. The test locations are shown as Inf-] and Inf-2 on the Site Plan in Figure
2. Infiltration Pits l and 2 were performed at respective depths of approximately 2.0 feet below the
existing ground surface.
We installed a six-inch diameter ve11ical tube into the native soil at the test locations within Infiltration Pit
l and 2. Approximately two inches of pea gravel was placed over the native soil. We made repeated
measurements of the time for the infiltration of six inches of water into the native sand soil. The average
infiltration rate from each data set was used for the measured infiltration rate. The measured infiltration
rates obtained in the field were 116.03 inches per hour for Infiltration Pit 1 and 6 I .31 inches per hour for
Infiltration Pit 2. We have not applied a factor of safety to the in-place infiltration test results.
We referenced Equation 5-11 within Chapter 5.4. l of the 2009 King County Surface Water Design
Manual that applies adequate correction factors to the field measured infiltration rate to generate a long-
term design infiltration rate. Correction factors of 0.30, 0.50, and 0.80 were utilized in this equation for
Ftesting, Fgeometry, Fplugging, respectively. Using these conection factors along with the lower of the
two field measured infiltration rates, we calculated a long-term design infiltration rate of 7.35 inches per
hour. We recommend that the on-site infiltration systems exposing the competent granular glacial
outwash soils be designed utilizing the 7.35 inch per hour rate. We should be retained during
NELSON GEOTECHNICAL ASSOC/A TES, INC.
Geotechnical Engineering Evaluation
Aberdeen Avenue Short Plat and Infiltration
Renton, Washington
NGA File No. 971516
October 17, 2016
Page 12
construction to evaluate the soils exposed in the infiltration systems to verify that the soils are appropriate
for infiltration.
We recommend that the infiltration trenches extend through any organic soil or fill to expose undisturbed
native granular outwash soils. We should be retained to verify the existence of such material at the time
of construction. The storm water management systems should be designed in accordance with the King
County Stormwater Design Manual. We recommend that any proposed infiltration systems be located as
to not negatively impact any proposed or existing nearby structures and also meet all required setbacks
from existing property lines, structures, and sensitive areas in accordance with the City of Renton code.
The stormwater manual recommends a three-foot separation between the base of an infiltration system
and any underlying bedrock, impermeable horizon, or groundwater. We did not encounter any
groundwater in our explorations to the depths explored.
Surface Drainage: The finished ground surface should be graded such that stormwater is directed to an
appropriate stormwater collection system. Water should not be allowed to stand in any areas where
footings, slabs, or pavements are to be constructed. Final site grades should allow for drainage away from
the residences. We suggest that the finished ground be sloped at a minimum gradient of three percent, for
a distance of at least 10 feet away from the residences. Surface water should be collected by permanent
catch basins and drain lines, and be discharged into an appropriate discharge system. The overflow water
should be dispersed to discharge into an appropriate location.
Subsurface Drainage: If groundwater is encountered during construction, we recommend that the
contractor slope the bottom of the excavation and collect the water into ditches and small sump pits where
the water can be pumped out and routed into a permanent storm drain.
We recommend the use of footing drains around the structures. Footing drains should be installed at least
one foot below planned finished floor elevation. The drains should consist of a minimum 4-inch-
diameter, rigid, slotted or perforated, PVC pipe surrounded by free-draining material wrapped in a filter
fabric. We recommend that the free-draining material consist of an 18-inch-wide zone of clean (less than
three-percent fines), granular material placed along the back of walls. Pea gravel is an acceptable drain
material. The free-draining material should extend up the wall to one foot below the finished surface.
The top foot of backfill should consist of impermeable soil placed over plastic sheeting or building paper
to minimize surface water or fines migration into the footing drain. Footing drains should discharge into
NELSON GEOTECHNICAL ASSOC/A TES, INC.
Geotechnical Engineering Evaluation
Aberdeen Avenue Short Plat and Infiltration
Renton, Washington
NGA File No. 971516
October 17, 2016
Page 13
tightlines leading to an appropriate collection and discharge point with convenient cleanouts to prolong
the useful life of the drains. Roof drains should not be connected to wall or footing drains.
CONSTRUCTION MONITORING
We should be retained to provide construction monitoring services during the earthwork phase of the
project to evaluate subgrade conditions, temporary cut conditions, fill compaction, and drainage system
installation.
USE OF THIS REPORT
NGA has prepared this report for Cu1rnn Kwan with Prime Metropolis Properties, Inc. and his agents, for
use in the planning and design of the development on this site only. The scope of our work does not
include services related to construction safety precautions and our recommendations are not intended to
direct the contractors' methods, techniques, sequences, or procedures, except as specifically described in
our report for consideration in design. There are possible variations in subsurface conditions between the
explorations and also with time. Our report, conclusions, and interpretations should not be construed as a
warranty of subsurface conditions. A contingency for unanticipated conditions should be included in the
budget and schedule.
We recommend that NGA be retained to provide monitoring and consultation services during
construction to confirm that the conditions encountered are consistent with those indicated by the
explorations, to provide recommendations for design changes should the conditions revealed during the
work differ from those anticipated, and to evaluate whether or not earthwork and foundation installation
activities comply with contract plans and specifications. We should be contacted a minimum of one week
prior to construction activities and could attend pre-construction meetings if requested.
Within the limitations of scope, schedule, and budget, our services have been performed in accordance
with generally accepted geotechnical engineering practices in effect in this area at the time this report was
prepared. No other warranty, expressed or implied, is made. Our observations, findings, and opinions are
a means to identify and reduce the inherent risks to the owner.
0-0-0
NELSON GEOTECHNICAL ASSOCIATES, INC.
Geotechnical Engineering Evaluation
Aberdeen Avenue Short Plat and lnfiltration
Renton, Washington
NGA File No. 971516
October 17, 2016
Page 14
It has been a pleasure to provide service to you on this project. If you have any questions or require
fut1her information, please call.
Sincerely,
NELSON GEOTECHNICAL ASSOC/A TES, INC,
Alex B. Rinaldi, GIT
Staff Geologist
LEE S. BELLAH
Lee S. Bellah, LG
Project Geologist
Khaled M. Sha wish
Principal
LSB:KMS:dy
Five Figures Attached
NELSON GEOTECHNICAL ASSOC/A TES, INC.
' ~
VICINITY MAP N
Not to Scale
(I
z ,':,
'" z
,,1
,', /•1111 51 l·lf 2.',1:1"1Sl
I NF/;;11) Pi'
® ···H'. ::=::irrJ Sr
{:
Isl: ·,·.:.,<J :,.
IT-~-,
Project J C,
~ Site
'[ '.l(Jh; ':_;i
Mi· :./Uh ~-,1
,,.
~ ~~ ~ 0 -< ~rLLLLJ ,"'. 0 .,
0 t 5' " 0
'!2 ;; ,.~
7-0 ~ ,.,.
:;.:
.t; ,-
Pinnocle Ori l.ake e ~,]
Washing1on ·~, ~
I 0 ® ? ,, j "' ~"'
I r, M z
~
r.:r. '.Gtc1 ::;; r·IC lff;'..>·.
s > '2) g
"' fl 0 f,. 0 McKr~ight Middle School i ~; 0
0
,.:;:_,, ~ ,
0 • is ' 2
~-~-Jr 14th St rr; t ::..
~ ~
" I ' ~ •
ii'° '".•111·:r (ff i(lil !3\ «
,;
' l ,-" C . .
l ~ • ~
Renton, WA < m
~
~
I i
I ~
~
~
0
~
<
I ~
Project Number ~ELSON GEOTECHNICAL No. Date Revision By CK z
m
971516 Aberdeen Avenue Short Plat NGA ASSOCIATES, INC, 0
Infiltration 1 10/5116 Original DPN ABR %
GEOTECHN[CAL ENGINEERS & GEOLOGISTS ~
I 1 Vicinity Map E
Figure 173\T-!351/1 Ay0.l'IE . .O,.~ Sno!>a,,..,., C<><Jnri,(4251JJ\l-113,19 ~ W<Jo><llnv!k. W>. 9ll072 Won,lchet1'1::hobn{509)&15-16'l6 . (~25) ~&$.1669 1Fo~~8H510 """"'"''°"""°'&h.ccm §
,,
co·
C ,
(1)
"'
"D ,
.2.
(!) (1)
...., C) ~-a, z
~ C
0) 3
?;:
(D a.
(D
(D
rr
(D
_::,
(/) ::, ~ ;:::.: ~ <
(D ::::::--(D
"TI [l) ::, -~c
[l) 0 (D
::, ::, (/)
~!" ias .. ~ ~-'~ ~:: f;ji
'" !H H 'a' ;,Q H-3 ~~:! -~· ~ig ~~~ •• , .
" " 0
" m n
" z
ii > r
"' z
0
z m m • •
" " m
0 r
0
0 • " •
::,-
0
;:i.
J1
!!l.
I z
"' :,,r
"' en "'0 oz
!2 Gl
)> "' ---1 0
"'---1
Ul "' • 0
-J: z z
!" -0
)>
r
-z
~ -" I Cl ~ ;-
-
ilf -iii" o· ,
a I "' ~ "'
INF-1
I -•-I
TP-1
I -•-I
l
w z f a,
~ Q C a,
a,
m <(
lTP-4
I T
-
LEGEND
Property line
Number and approximate
location of test pit
Number and approximate
location of test pit
I
r
Site Plan
Proposed residence
I
/-W""'-•11;•-· r-.,;,,r,,_n,
Proposed residence
__..:..---,::i..,. INF-1 •-
I TP-1
'.~,-,-,---'---+-+"·,,___ __ +-......;s=.._J
I __L--~ .. ..:.~·-· -~-
""
I I -•-
Lot 1 I
I I \ INF-2 = TP-3
I ---Lot 2
I { tj) j F =ir-Ll w...::1 .. -, 1
'
Existing residence to
be removed
'--11;J>>f,c'11 .. N'N<I
Existing garage to
be removed
Existing residence to
be removed
0 40 80
Scale: 1 inch = 40 feet
• I C) ~ "I Reference: Site plan based on a plan dated March 24 2016 titled "Averdeen Ave. SL,Jbdivision." prepared by CG En
N:\2016 NGA Project Folders\9715-16 Aberdeen Avenue, Renton lnfiltrat!on\Drafling\SP .dwg
N
UNIFIED SOIL CLASSIFICATION SYSTEM
GROUP
MAJOR DIVISIONS SYMBOL GROUP NAME
CLEAN GW WELL-GRADED, FINE TO COARSE GRAVEL
COARSE-GRAVEL
GRAVEL GP POORLY-GRADED GRAVEL
GRAINED MORE THAN 50 % GRAVEL OF COARSE FRACTION GM SIL TY GRAVEL
RETAINED ON
SOILS NO. 4 SIEVE WITH FINES
GC CLAYEY GRAVEL
SAND CLEAN SW WELL-GRADED SAND, FINE TO COARSE SAND
SAND
SP POORLY GRADED SAND
MORE THAN 50 %
RETAINED ON MORE THAN 50 %
NO. 200 SIEVE
OF COARSE FRACTION SAND SM SILTY SAND PASSES NO. 4 SIEVE
WITH FINES SC CLAYEY SAND
FINE-SILT AND CLAY ML SILT
INORGANIC
GRAINED LIQUID LIMIT CL CLAY
LESS THAN 50 %
SOILS ORGANIC OL ORGANIC SILT, ORGANIC CLAY
SILT AND CLAY MH SILT OF HIGH PLASTICITY, ELASTIC SILT
MORE THAN 50 % INORGANIC
PASSES LIQUID LIMIT CH CLAY OF HIGH PLASTICITY, FLAT CLAY
NO. 200 SIEVE 50 % OR MORE
ORGANIC OH ORGANIC CLAY, ORGANIC SILT f u
~
HIGHLY ORGANIC SOILS PT PEAT
~
~
NOTES: ~
1) Field classification is based on visual SOIL MOISTURE MODIFIERS: i s
examination of soil in general C
~
accordance with ASTM D 2488-93. Dry-Absence of moisture, dusty, dry to ~
the touch " 2) Soil classification using laboratory tests ' Moist -Damp, but no visible water. ! is based on ASTM D 2488-93. • •
Wet -Visible free water or saturated, ~
3) Descriptions of soil density or •
usually soil is obtained from ~ consistency are based on ~
interpretation of blowcount data, below water table ~ ;:: visual appearance of soils, and/or I test data. ~
0
Project Number " ~ELSON GEOTECHNICAL No. Date Revision By CK 6
Aberdeen Avenue Short Plat •
971516 NGA ASSOCIATES, INC. e
Infiltration 1 1015116 Orlglnal DPN ABR ~
GEOTECHNICAL ENGINEERS Be GEOLOGISTS ~ z
Figure 3 Soil Classification Chart 17J11-1J.5,j,J,l'<'J ~"'·"-'500 Snghaml,~ Coont'j (~l~)JJ?-161;9 w
Woo<fuwii... WJ, 1grm W•n•ld'!oe/Ch<llon 1509) 6!1~71196 s
(':!5)l6'l-161i91F••~at-151a www.11ej>0"'"0<11oc11.com ~ z
DEPTH (FEET]
TEST PIT ONE
0.0 -0.2
0.2 -0.6
0.6 -4.0
4.0 -10.0
TEST PIT TWO
0.0 -0.2
0.2 -0.5
0.5 -6.0
6.0 -9.0
TEST PIT THREE
0.0 -0.2
0.2 -0.9
0.9 -8.0
8.0 -9.5
ABR:LSB
USC
LOG OF EXPLORATION
SOIL DESCRIPTION
GRASS AND ROOTS
DARK BROWN, SILTY FINE TO MEDIUM SAND WITH GRAVEL AND ROOTS
(LOOSE TO MEDIUM DENSE, MOIST) (TOPSOIL)
LIGHT BROWN, FINE TO MEDIUM SAND WITH SILT, CONCRETE RUBBLE, TRACE ROOTS, AND
GRAVEL (LOOSE TO MEDIUM DENSE, MOIST] (FILL)
LIGHT BROWN TO GRAY BROWN, FINE TO MEDIUM SAND WITH SILT AND TRACE GRAVEL
SP-SM (MEDIUM DENSE TO DENSE, MOIST)
SAMPLES WERE COLLECTED AT 3.0, 6.0, 9.0, 10.0 FEET
GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED
SLIGHT TEST PIT CAVING WAS ENCOUNTERED
TEST PIT WAS COMPLETED AT 10.0 FEET ON 1014116
GRASS AND ROOTS
DARK BROWN, SIL TY FINE TO MEDIUM SAND WITH GRAVEL AND ROOTS/ORGANICS
(LOOSE TO MEDIUM DENSE, MOIST] (TOPSOIL)
SP-SM LIGHT BROWN, FINE TO MEDIUM SAND WITH SILT, TRACE GRAVEL AND ROOTS
(MEDIUM DENSE TO DENSE, MOIST)
SP-SM BROWN-GRAY, FINE TO COARSE SAND WITH SILT, GRAVEL, AND TRACE ROOTS
(MEDIUM DENSE TO DENSE, MOIST)
SAMPLES WERE COLLECTED AT 2.0, 6.0, AND 9.0 FEET
GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED
SLIGHT TO MODERATE TEST PIT CAVING WAS ENCOUNTERED FROM 6.0 TO 9.0 FEET
TEST PIT WAS COMPLETED AT 9.0 FEET ON 1014116
GRASS AND ROOTS
DARK BROWN, SILTY FINE TO MEDIUM SAND WITH GRAVEL, IRON-OXIDE STAINING, AND ROOTS
(LOOSE TO MEDIUM DENSE, MOIST] (TOPSOIL)
SP-SM LIGHT BROWN, FINE TO MEDIUM SAND WITH SILT, TRACE IRON-OXIDE WEATHERING, ROOTS
AND GRAVEL (MEDIUM DENSE TO DENSE, MOIST]
SP-SM GRAY-BROWN, FINE TO COARSE SAND WITH SILT, TRACE IRON-OXIDE WEATHERING, ROOTS
AND GRAVEL (MEDIUM DENSE TO DENSE, MOIST]
SAMPLES WERE COLLECTED AT 2.5, 6.5, AND 9.0 FEET
GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED
SLIGHT TEST PIT CAVING WAS ENCOUNTERED FROM 0.2 TO 9.5 FEET
TEST PIT COMPLETED AT 9.5 FEET ON 1014116
NELSON GEOTECHNICAL ASSOCIATES, INC.
FILE NO 971516
FIGURE4
DEPTH (FEET)
TEST PIT FOUR
a.a -0.2
0.2 -0.8
0.8 -2.5
2.5 -3.0
INFILTRATION PIT
ONE
USC
LOG OF EXPLORATION
SOIL DESCRIPTION
GRASS AND ROOTS
DARK BROWN, SILTY FINE TO MEDIUM SAND WITH GRAVEL, IRON-OXIDE STAINING, AND ROOTS
(LOOSE TO MEDIUM DENSE, MOISD (TOPSOIL)
LIGHT BROWN, FINE TO MEDIUM SAND WITH SILT, TRACE ROOTS AND GRAVEL
(LOOSE TO MEDIUM DENSE, MOISD (FILL)
DRAIN ROCK AND CONRETE DRAIN PIPE
NO SAMPLES WERE COLLECTED
GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED
INFILTRATION PIT CAVING WAS NOT ENCOUNTERED
INFIILTRATION PIT COMPLETED AT 3.0 FEET ON 1014116
0.0 -0.2 GRASS AND ROOTS
0.2-1.0 DARK BROWN, SILTY FINE TO MEDIUM SAND WITH GRAVEL, IRON-OXIDE STAINING, AND ROOTS
(LOOSE TO MEDIUM DENSE, MOIST) (TOPSOIL)
1.0-8.0
INFILTRATION PIT
lWO
SP-SM LIGHT BROWN, FINE TO MEDIUM SAND WITH SILT, IRON-OXIDE WEATHERING AND TRACE
GRAVEL (MEDIUM DENSE TO DENSE, MOIST)
SAMPLES WERE COLLECTED AT 3.5 AND 8.0
GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED
SLIGHT INFILTRATION PIT CAVING WAS ENCOUNTERED FROM 1.0 TO 8.0 FEET
INFIILTRATION PIT COMPLETED AT 8.0 FEET ON 1014116
0.0 -0.2 GRASS AND ROOTS
0.2 -1.5 DARK BROWN, SIL TY FINE TO MEDIUM SAND WITH GRAVEL, IRON-OXIDE STAINING, AND ROOTS
(LOOSE TO MEDIUM DENSE, MOISD (TOPSOIL)
1.5-7.0
7.0 -9.0
ABR:LSB
SP-SM LIGHT BROWN, FINE TO MEDIUM SAND WITH SILT, GRAVEL, IRON-OXIDE WEATHERING, AND
TRACE ROOTS (MEDIUM DENSE TO DENSE, MOIST)
SP-SM GRAY-BROWN, FINE TO COARSE SAND WITH SILT AND TRACE GRAVEL
(MEDIUM DENSE TO DENSE, MOISD
SAMPLES WERE COLLECTED AT 5.0, 7.0, AND 9.0
GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED
SLIGHT INFILTRATION PIT CAVING WAS ENCOUNTERED FROM 1,5 TO 9.0 FEET
INFIil TRATION PIT COMPLETED AT 9.0 FEET ON 1014/16
NELSON GEO TECHNICAL ASSOC/A TES, INC.
FILE NO 971516
FIGURE 5
DATE:
TO:
CC:
FROM:
RE:
NELSON GE:OTECHNICAL
ASSOCIATES, INC.
GEOTECHNICAL ENGINEERS & GEOLOGISTS
Main Office
173!1-!35 1hi\veNE,A-500
Woodinville, WA 98072
(425) 486-1669 · FAX (425) 481-2510
Engineering-Geology Branch
5526 Industry Lane, #2
East Wenatchee, WA 98802
(509) 665-1696 · FAX (509) 665-7692
MEMORANDUM
February I 0, 2017
Mr. Curran Kwan
Mr. Greg Guillen -CG Engineering
Khaled M. Shawish, PE
Lee S. Bellah, LG
Aberdeen A venue Short Plat
Supplemental Memorandum
1824 Aberdeen Avenue
Renton, Washington
NGA File No. 971516
INTRODUCTION
This memo presents our responses to review comments raised by the City of Renton regarding the
proposed residence project located at 1824 Aberdeen Avenue in Renton, Washington.
We have previously prepared a geotechnical engineering evaluation for the project site titled "Aberdeen
Avenue Short Plat and Infiltration," dated October 17, 2016. We understand that concerns have been
raised by the City of Renton Depaiiment of Community and Economic Development regarding
geotechnical aspects of the on-site infiltration testing. Their comments were presented in a comment letter
titled "Utility and Transportation Comments for Aberdeen Avenue Short Plat," dated January 31, 2017,
prepared by Mr. Ian Fitz-James. For our use in preparing this memo, we were provided with Plan Sheets
Cl.I through C3.l titled "Aberdeen Avenue Subdivision," dated December 16, 2016, prepared by CG
Engineering. In the following sections, we summarize the geotechnical concern raised by the City of
Renton, followed by our responses to each concern.
Aberdeen Avenue Short Plat Supplemental Memorandum
I 8 24 Aberdeen A venue
Renton, Washington
CITY OF RENTON REVIEW CONCERNS AND OUR RESPONSES
Review Comment Surface Water 3.a.:
NGA File No. 971516
Febrnary 10, 2017
Page 2
Section 5.2.1 of the RSWDM requires that infiltration tests be pe,formed al the elevation of botlom of the
proposed infiltration facility (Elev. 293 as shown on plans). Provide verification of the depth of the
infiltration tests. The geotechnical report states that the infiltration tests were pe,formed al approximately
two feel below existing grade which is several feet above botlom of proposed facility
Response:
Based on our review of the prnvided plans, we understand that storm water generated within the site will
be directed to a 5-foot wide by 80-foot long by 2.0 foot thick gravel-filled infiltration trench located
within the driveway area along the southern po1iion of the site. The base of the infiltration trench is
prnposed to be at an apprnximate elevation of 293 feet. At the time our infiltration testing was performed
within the site, the exact location, and overall size and depth of the proposed infiltration system was
unknown. As a part of our previous evaluation of the prope,ty, we performed several additional deeper
test pit explorations throughout the prope1iy that extended up to 10.0 feet below the existing grnund
surface. All of our test pits performed within the site encountered and were terminated within native
glacial recessional outwash soils consisting of fine to medium sand with gravel and silt. Test Pit l and
Infiltration Pit I located immediately north of the proposed infiltration area were located at a grnund
surface elevation of 298 feet. Test Pit I extended down to 10.0 feet below the existing ground surface
(approximate elevation of 288 feet) and encountered native glacial recessional outwash soils to the depth
explored. Our on-site infiltration test performed within Infiltration Pit I was conducted in the native
recessional outwash soils at a depth of 2.0 feet below the existing ground surface (apprnximate elevation
of 296 feet). After the infiltration testing was concluded in lnfiltration Pit I, this pit was further
excavated an additional six feet (approximate elevation of 290 feet) and encountered the same granular
native recessional outwash soils to the depth explored. Based on this, it is our opinion that the proposed
infiltration trench located at an elevation of 293 feet should encounter native glacial recessional outwash
soils similar to the soils that we conducted our on-site infiltration testing into, and these soils appear to
extend at least five feet below the prnposed infiltration facility. It is also om opinion, that the
recommended long-term design infiltration rate of 7.35 inches per hour should be valid at the planned
infiltration trench depth. We recommend that we be retained during construction to verify the soils
exposed in the entire infiltration area are similar to the soils encountered during our explorations.
NELSON GEO TECHNICAL ASSOC/A TES, INC.
Aberdeen Avenue Short Plat Supplemental Memorandum
1824 Aberdeen Avenue
Renton, Washington
CLOSURE
NGA File No. 971516
February 10, 2017
Page 3
We trust this memorandum should satisfy your needs at this time. Please contact us if you have any
questions or require additional services.
0-0-0
NELSON GEO TECHNICAL ASSOC/A TES, INC.
Aberdeen Ave Subdivision 16037.20
Technical Information Report
TIR Section VII
Narrative
TIR Section VII -Other Permits
February 16, 2017
Section VII, Page 1
Other permits are not anticipated that would contain more restrictive drainage plan requirements.
C5
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I t. 425.778.5536
www .cge ngi nee ring.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
February 16, 2017
Section VIII, Page 1
TIR Section VIII -CSWPPP Analysis and Design
TIR Section VIII Summary
Narrative
This section of the TIR is to provide a summary of erosion controls and source controls for the site.
The project proposes to subdivide a single 16,161 sf parcel in the R-8 zone into 2 individual single-family
lots. The site currently contains one single-family home with a detached garage and a detached
accessory building. The existing structures will be demolished in order to add an access and utility tract,
and a house on the back lot. The project will add more than 2,000 sf of impervious surfaces and so must
meet the Full Drainage requirements from the 2016 King County Surface Water Design Manual as
amended by the City of Renton. The project will construct the necessary stormwater improvements for
the access/utility tract and lots, but development of Lots 1 and 2 will occur at a later date.
ESC and SWPPS measures were chosen per Section D.2 the 2016 King County Surface Water Design
Manual. Less than 1 acre of land will be disturbed and therefore the Department of Ecology SWPPP and
Construction Stormwater General Permit is not required.
ESC Measures
The following ESC measures are suggested for each category below;
1. Clearing Limits:
To protect adjacent properties, existing trees, and to reduce the area of soil exposed to
construction, the limits of construction will be clearly marked before land-disturbing activities begin.
The BMPs relevant to marking the clearing limits that will be applied for this project include:
• High Visibility Plastic or Metal Fence
2. Cover Measures
Exposed and unworked soils shall be stabilized with the application of effective BMPs to prevent
erosion throughout the life of the project. Temporary cover shall be installed if an area is to remain
unworked for more than seven days during the dry season (May 1 to September 30) or for more
than two consecutive working days during the wet season (October 1 to April 30). The suggested
BMPs for soil stabilization that shall be used on this project include:
• Temporary & Permanent Seeding
• Mulching
• Nets & Bia n kets
• Plastic Covering
3. Perimeter Protection
All stormwater runoff from disturbed areas shall pass through an appropriate sediment removal
BMP before leaving the construction site or prior to being discharged. Silt fences will be installed on
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I 1. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
February 16, 2017
Section VIII, Page 2
the downstream sides of the site. The specific BMPs to be used for controlling sediment on this
project include:
• Silt Fence
4. Traffic Area Stabilization
A stabilized construction entrance will be established to the west side of the site using the existing
gravel driveway.
• Stabilized Construction Entrance
5. Sediment Retention
The site is small enough that perimeter protection is expected to be adequate for sediment
retention onsite.
6. Surface Water Collection
The site is small enough that perimeter protection is expected to be adequate for sediment
retention onsite.
7. Dewatering Control
Dewatering is not anticipated.
8. Dust Control
Dust control will be used to minimize wind transport of soil. Water and/or other dust control
measures may be used upon approval by the County.
• Dust Control
9. Flow Control
Increases in the 2-year and 10-year runoff event is expected to be small due to the size of the site.
Flow control measures are not proposed.
10. Protect Existing and Proposed Flow Control BMPs
Stormwater facilities and on-site BMPs areas are identified on the Temporary Erosion Control Plan.
These areas shall be protected from sedimentation and soil compaction that would adversely affect
infiltration.
11. Maintain BMPs
BMPs will be maintained and repaired as necessary throughout construction. The CSWPP supervisor
shall review the site for ESC and SWPPS at least weekly and within 24 hours of significant storms. All
temporary erosion and sediment control BMPs will be removed within 30 days after achieving final
site stabilization.
12. Manage the Project
Projects shall assign a qualified CSWPPP supervisor to be the primary contact for ESC and SWPPP
issues and reporting.
CT?
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I 1. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
SWPPS Measures
The following SWPPS measures are expected for the site.
1. Concrete Handling
February 16, 2017
Section VIII, Page 3
Management practices per Section D.2.2.1 "Concrete Handling" shall be utilized any time concrete is
used to minimize and eliminate concrete, concrete process water, and concrete slurry runoff.
2. Concrete Washout Area
Prevent or reduce the discharge of pollutants to stormwater from concrete waste by conducting
washout off-site, or performing on-site washout in a designated area to prevent pollutants from
entering surface waters or ground water.
3. Sawcutting and Surfacing Pollution Prevention
Utilize these management practices anytime sawcutting or surfacing operations take place.
Sawcutting and surfacing operations include, but are not limited to, sawing, coring, grinding,
roughening, hydrodemolition, bridge and road surfacing.
4. Material Delivery, Storage and Containment
These procedures are suitable for use at all construction sites with delivery and storage of the
following materials: Petroleum products such as fuel, oil and grease; Soil stabilizers and binders
(e.g. Polyacrylamide); Fertilizers, pesticides and herbicides; Detergents; Asphalt and concrete
compounds; Hazardous chemicals such as acids, lime, adhesives, paints, solvents and curing
compounds; Any other material that may be detrimental if released to the environment.
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I t. 425.778.5536
www .cge ngi nee ring.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
February 16, 2017
Section IX, Page 1
TIR Section IX -Bond Quantities, Facility Summaries, and
Declaration of Covenant
TIR Section IX Summary:
Narrative
A Declaration of Covenant is provided for the proposed flow control BMP.
There are no flow control facilities.
CT
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I 1. 425.778.5536
www.cgengineering.com
RECORDING REQUESTED BY AND
WHEN RECORDED MAIL TO:
CITY CLERK'S OFFICE
CITY OF RENTON
1055 SOUTH GRADY WAY
RENTON WA 98057
DECLARATION OF COVENANT
FOR MAINTENANCE AND INSPECTION OF FLOW CONTROL BMPS
Grantor: _____________ _
Grantee: City of Renton
L ID . . THAT PORTION OF TRACT 244 INC D HILLMAN'S LAKE ega escnpt10n: __________________________ _
WASHINGTON GARDEN OF EDEN ADDITION TO SEATTLE DIVISION NO 4,
ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 11 OF PLATS,
. . SEE BELOW Add1t1onal Legal(s) on: ________________________ _
Assessor's Tax Parcel ID#: 334390 -1606
------------------------
IN CONSIDERATION of the approved City ofRenton(check one of the following) D residential
building permit, D commercial building permit, D clearing and grading permit, D subdivision permit, or
~ short subdivision permit for Application File No. LUA/SWP ________ relating to the
real property ("Property") described above, the Grantor(s), the owner(s) in fee of that Property, hereby
covenants( covenant) with City or Renton, a political subdivision of the state of Washington, that
he/she(they) will observe, consent lo, and abide by the conditions and obligations set forth and described
in Paragraphs 1 through 8 below with regard to the Property. Grantor(s) hereby grants(grant),
covenants( covenant). and agrees(agree) as follows:
1. Grantor(s) or his/her(their) successors in interest and assigns ("Owners") shall retain, uphold,
and protect the storm water management devices, features, pathways, limits, and restrictions, known as
flow control best management practices ("BMPs"), shown on the approved Flow Control BMP Site Plan
for the Property attached hereto and incorporated herein as Exhibit A.
2. The Owners shall at their own cost, operate, maintain, and keep in good repair, the Property's
BMPs as described in the approved Design and Maintenance Details for each BMP attached hereto and
incorporated herein as Exhibit B.
3. City or Renton shall provide at least 30 days written notice to the Owners that entry on the
Property is planned for the inspection of the BMPs. After the 30 days. the Owners shall allow the City of
Renton to enter for the sole purpose of inspecting the BMPs. In lieu of inspection by the City, the
Owners may elect to engage a licensed civil engineer registered in the state of Washington who has
expertise in drainage to inspect the BMPs and provide a written report describing their condition. If the
engineer option is chosen, the Owners shall provide written notice to the City of Renton within fifteen
days of receiving the City's notice of inspection. Within 30 days of giving this notice, the Owners, or the
engineer on behalf of the Owners, shall provide the engineer's report to the City of Renton. If the report
is not provided in a timely manner as specified above, the City of Renton may inspect the BMPs without
further notice.
4. If the City determines from its inspection, or from an engineer's report provided in accordance
with Paragraph 3, that maintenance, repair, restoration, and/or mitigation work is required for the BMPs,
The City shall notify the Owners of the specific maintenance, repair, restoration, and/or mitigation work
(Work) required under RMC 4-6-030. The City shall also set a reasonable deadline for completing the
Work or providing an engineer's report that verifies completion of the Work. After the deadline has
passed, the Owners shall allow the City access lo re-inspect the BMPs unless an engineer's report has
been provided verifying completion of the Work. If the work is not completed properly within the time
frame set by the City, the City may initiate an enforcement action. Failure to properly maintain the BMPs
is a violation of RMC 4-6-030 and may subject the Owners to enforcement under the RMC 1-3, including
fines and penalties.
5. Apart from perfonning routine landscape maintenance, the Owners are hereby required to
obtain written approval from the City or Renton before performing any alterations or modifications to the
BMPs.
6. Any notice or approval required to be given by one party to the other under the provisions of
this Declaration of Covenant shall be effective upon personal delivery to the other party, or after three (3)
days from the date that the notice or approval is mailed with delivery confirmation to the current address
on record with each Party. The parties shall notify each other of any change to their addresses.
7. This Declaration of Covenant is intended to promote the efficient and effective management of
surface water drainage on the Property, and it shall inure to the benefit of all the citizens of the City of
Renton and its successors and assigns. This Declaration of Covenant shall run with the land and be
binding upon Grantor(s), and Grantor's(s') successors in interest and assigns.
8. This Declaration of Covenant may be terminated by execution of a written agreement by the
Owners and the City of Renton that is recorded by King County in its real property records.
IN WITNESS WHEREOF, this Declaration of Covenant for the Maintenance and Inspection of
Flow Control BMPs is executed this ___ day of ___ _ ,20
GRANTOR, owner of the Property
GRANTOR, owner of the Property
STATE OF WASHINGTON )
COUNTY or KING )ss_
On this day personally appeared before me:
___________________ ,tome known to be the individual(s) described in
and who executed the within and foregoing instrument and acknowledged that they signed the same as
their free and voluntary act and deed, for the uses and purposes therein stated.
Given under my hand and official seal this __ day of _________ , 20
Printed name
Notary Public in and for the State of Washington,
residing at
My appointment expires _________ _
FULL LEGAL DESCRIPTION:
THAT PORTION OF TRACT 244 INC D HILLMAN'S LAKE WASHINGTON GARDEN OF EDEN ADDITION TO
SEA TILE DIVISION NO 4, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 11 OF PLATS,
PAGE 82, IN KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS
BEGINNING AT A POINT ON THE WEST BOUNDARY LINE OF SAID TRACT, 301 FEET SOUTH OF THE
NORTHWEST CORNER OF SAID TRACT;
THENCE SOUTH 64 FEET;
THENCE EAST 252.3 FEET, MORE OR LESS, TO THE EAST BOUNDARY LINE OF SAID TRACT;
THENCE NORTH, ALONG SAID EAST BOUNDARY LINE, 64 FEET; THENCE WEST 252.3 FEET, MORE OR
LESS, TO POINT OF BEGINNING;
(BEING THE NORTH 365 FEET OF SAID TRACT 244, EXCEPT THE NORTH 301 FEET THEREOF).
:.0 :c >< w
····_:.:L:-
l-·· ''JN ]AV NJJQ~JBV·
-~ ! · .Bn1m M.l'.t,or,oos~ ·•.
-....,t._ -
•• "4-·-·-y•·-·--·-•-••
' .::::, :Ji
T"'~ -
: i::-.:---,--
.c
" C
i
C
0
]
<.= ·" ai > ~ en
"-" OJ
Cl
i---N
: ><
in
><
a
00
' ----
~--------""'~
MAINTENANCE INSTRUCTIONS FOR FULL INFILTRATION
Your property contains an on-site BMP (besl management practice) called "full infiltration," which
was installed to mitigate the storm water quantity and quality impacts of some or all of the impervious
surfaces on your property.
Full infiltration is a method of soaking runoff from impervious area (such as paved areas and roofs)
into the ground. If properly installed and maintained per Appendix A of the City ofRenton's Surface
Water Design Manual, full infiltration can manage runoff so that a majority of precipitation events are
absorbed. Infiltration devices, such as gravel filled trenches, drywells, and ground surface depressions,
facilitate this process by putting runoff in direct contact with the soil and holding the runoff long
enough to soak most of it into the ground. To be successful, the soil condition around the infiltration
device musl be reliably able to soak water into the ground for a reasonable number of years.
Infiltration Devices
The infiltration devices used on your property include the following as indicated on the site
plan (CHECK THE BOX(ES) THAT APPLY):
llllgravel filled trenches. Ddrywells, Dground surface depressions.
MAINTENANCE RESTRICTIONS
The size, placement, and composition of these devices as depicted by the site plan and design details
must be maintained and may not be changed without written approval from the City of Renton or
through a future development permit from the City of Renton.
INSPECTION FREQUENCY AND MAINTENANCE GUIDELINES
• Infiltration devices must be inspected annually and after major storm events to identify and
repair any physical defects.
• Maintenance and operation of the system should focus on ensuring the system's viability by
preventing sediment-laden flows from entering the device. Excessive sedimentation will result
in a plugged or non-functioning facility.
• If the infiltration device has a catch basin, sediment accumulation must be removed on a yearly
basis or more frequently if necessary.
• Prolonged ponding around or atop a device may indicate a plugged facility. If the device
becomes plugged, it must be replaced.
• Keeping the areas that drain to infiltration devices well swept and clean will enhance the
longevity of these devices.
• For roofs, frequent cleaning of gutters will reduce sediment loads to these devices.
TYPICAL FULL INFILTRATION APPLICATIONS
INFILTRATION TRENCH
PLAN VIEW
NTS
TRENCH SETBACK FROM
BUILDING AS REQUIRED, ROOF DRAIN
SECTION VIEW
NTS
15' MIN
~~RFLOW--i
FINE MESH
SCREEN
,
SPLASH BLOCK
, 1 ~l r-_J_
11,"-t--_ I 1'MINL 1JL.J--_cJ 1' ilN. \
-· SETBACK --
FROM
BUILDING
S"MIN
CB SUMP w/SOLID LID
COMPACTED BACKFILL
FILTERFABR!C
4" RIGID OR 6'" FLEXIBLE
PERFORATED ?IPE
1j··. 3"· WASHED ROCK
MIN 1' ABOVE SEASONAL I
24
, _ I
HIGH GROUNDWATER r----~
ROOF DC'IV'ISPOVT
:JVERFLOW
sn.J>SH BLOCK
~ F\OW J
5-Ml~ SETBACK.
F~OM BUILDING -j
I FINE MESH SCH~~N
I
' CATCH SA$'N
iYARD DRAIN)
TABLE, SEE SECTION C2 22 !-
M!\Ri<(;ENTEROFHOLE.
IMTH1"CAPPEOPIIC
OR OTHER MEAN~
FLUSH WITH SU'lFAC~
\
TOPSOIL
MIN 4"01A.
PVC PIPE
SlllES OF HOL~
clNED'MTH
I'll.TE~ FABRIC
' i
_,
~(i~(>'
l·-· -· -~· ~ 48.INCH DIAMETER VARIES
""'
0
'.HOlE FILLED \NITII
1,t--3"WASHED 't
DRAIN ROCK
4 __ .s_• "_"_AS RHlUlREO, SEE SECllON C _[_
MIN. 1' AOOVE SEAsONAL
HIG~ GROUSOWAl EH fA0.E,
SEE SECTION C 2 l l
, -
SECTION
NT$ T
SECTION A
NTS
GRASS
M[N.1'AB0VE I
SEASONAL HIGH I 2' MIN
GROUNDWATER ----e
TABLE, SEE
SECTION C.2.2.2
FROM ROOF \
FILTER STRIP
SEE SECTIONS
634&635
X~SECTION
NTS
NOTE_:
SEE C.2 2.3 FOR
TRENCH LENGTHS,
TRENCH SPACING AND
SITE LIMITATIONS
BOND QUANTITY WORKSHEET INSTRUCTIONS --------Kenton e
Planning Division / 1055 South Grady Way-6th Floor/ Renton, WA 98057 (425) 430-7200
Community & Economic
Development
This worksheet is intended to be a "working" copy of the bond quantity worksheet, which will be used throughout all phases of the project, from initial
submittal to project close-out approval.
Submit this workbook, in its entirety, as fallows:
• (1) electronic copy (.x!sx format) and (1) hard copy of the entire workbook for civil construction permit submittal. Hard copies are to be included as part
of the Technical Information Report (Tl R).
• (1) electronic copy (.xlsx format) and (1) hard copy of the entire workbook for final close-out submittal.
The following forms are to be completed by the engineer/developer/applicant as applicable to the project:
Section I: Project Information
• This section includes all pertinent information for the project
• This section must be completed in its entirety
• Information from this section auto-populates to all other relevant areas of the workbook
Section II: Bond Quantities Worksheets
• Section II contains a separate spreadsheet TAB for each of the following specialties:
• Section II.a EROSION CONTROL (Stabilization/Erosion Sediment Control (ESC))
• Section 11.b TRANSPORTATION (Street and Site Improvements)
• Section 11.c DRAINAGE (Drainage and Stormwater Facilities):
• Section 11.d WATER -ONLY APPUCABLE IF WATER SERVICE IS PROVIDED BY CITY OF RENTON
• Section 11.e SANITARY SEWER -ONLY APPLICABLE IF SEWER SERVICE IS PROVIDED BY CITY OF RENTON
• Complete the 'Quantity' columns for each of the appropriate section(s). Include existing Right-of-Way (ROW), Future Public Improvements and Private
Improvements.
• Note: Private improvements, with the exception of stormwater facilities, are not included in the bond amount calculation, but must be entered on the
form. Stormwater facilities (public and private) are required to be included in the bond amount.
• The 'Quantity Remaining' column is only to be used when a project is under construction. The City allows one (1) bond reduction during the life of the
project with the exception of the maintenance period reduction.
• Excel will auto-calculate and auto-populate the relevant fields and subtotals throughout the document. Only the 'Quantity' columns should need
completing.
• Additional items not included in the lists can be added under the "write-in" sections. Provide a complete description, cost estimate and unit of measure
for each write-in item.
• All unit prices indude labor, equipment, materials, overhead and profit.
The Bond Worksheet form will auto-calculate and auto-populate from the information provided in Section I and Section II.
Page 1 of 14
Section Ill. Bond Worksheet
• This section calculates the required Permit Bond for construction permit issuance as well as the required Maintenance Bond for project close-out
submittals to release the permit bond on a project.
Unit Prices Updated: 06/14/2016
Version: 02/09/2017
SITE IMPROVEMENT BOND QUANTITY WORKSHEET ·R tCITY OF ~
PROJECTINFORMATION en on~
Planning Division / 1055 South Grady Way-6 1
h Floor/ Renton, WA 98057 (425) 430-7200
Community & Economic
Development
Date Prepared· [2/16/2017
Prepared by:
Name: Greg Guillen
PE Registration No: PE Registration No.
Firm Name: CG Engineering
Firm Address: 250 4th Aves, Suite 200
Phone No. 425.778.8500
Email Address: grego@cgengineering.com
Project Location and Description
Project Name: Aberdeen Avenue Short Plat
CED Plan# (LUA): LUA 16-000967
CED Permit# (U): ########
Site Address: 1824 Aberdeen Ave NE
Street Intersection: Aberdeen Ave NE and NE 20th St
Parcel #(s): 3343901606
Abbreviated Legal HILLMAN$ LK WN GARDEN OF EDEN It 4 S 54 FT OF N 365 FT
Description:
Clearing and Grading
Clearing and grading greater than or equal to 5,000 board feet of timber?
Yes/No: IND I
If Yes, Provide Forest Practice Permit#: IN/A
1 Select the current project status/phase from the following options:
For Approval -Preliminary Data Enclosed, pending approval from the City;
For Construction -Estimated Data Enclosed, Plans have been approved for contruction by the City;
Project Closeout -Final Costs and Quantities Enclosed for Project Close-out Submittal
Page 2 of 14
Project Phase 1 [FOR APPROVAL
Engineer Stamp Required
(all cost estimates must have original wet stamp and signature)
Project Owner Information
Project Owner: Prime Metropolis Properties, Inc.
Phone: 415. 731.0303
Address: 950 Taraval St.
San Francisco, CA 94116
Addt'I Project Owner: Additional Project Owner
Phone: Phone
Address: Address
City, State, Zip
Utility Providers
Water Service Provided by: I CITY OF RENTON
Sewer Service Provided by: I CITY OF RENTON
Unit Prices Updated: 06/14/2016
Version: 02/09/2017
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR EROSION & SEDIMENT CONTROL
CED Permit#:########
Unit
Description No. Reference# Price
Backfill & compaction-embankment ESC-1 $ 6.50
Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 80.00
Catch Basin Protection ESC-3 35.50
Crushed surfacing 11/4" minus ESC-4 WSDDT 9-03.9/3) 95.00
Ditching ESC-5 9.00
Excavation-bulk ESC-6 2.00
Fence, silt ESC-7 SWDM 5.4.3.1 1.50
Fence, Temporary (NGPE) ESC-8 1.50
Geotextile Fabric ESC-9 2.50
Hay Bale Silt Trap ESC-10 0.50
Hydroseeding ESC-11 SWDM 5.4.2.4 0.80
Interceptor Swale/ Dike ESC-12 1.00
Jute Mesh ESC-13 SWDM 5.4.2.2 3.50
level Spreader ESC-14 1.75
Mulch, by hand, straw, 3" deep ESC-15 SWDM 5.4.2.1 2.50
Mulch, by machine, straw, 2" deep ESC-16 SWDM 5.4.2.1 2.00
Piping, temporary, CPP, 6" ESC-17 12.00
Piping, temporary, CPP, 8" ESC-18 14.00
Piping, temporary, CPP, 12" ESC-19 18.00
Plastic covering, 6mm thick, sandbagged ESC-20 SWDM 5.4.2.3 4.00
Rip Rap, machine placed; slopes ESC-21 WSDOT9-13.1/2) 45.00
Rock Construction Entrance, SO'xlS'xl' ESC-22 SWDM 5.4.4.1 1,800.00
Rock Construction Entrance, 100'x1S'x1' ESC-23 SWDM 5.4.4.1 3,200.00
Sediment pond riser assembly ESC-24 SWDM 5.4.5.2 2,200.00
Sediment trap, S' high berm ESC-25 SWDM 5.4.5.1 19.00
Sed. trap, S' high, riprapped spillway berm section ESC-26 5WDM 5.4.5.1 70.00
Seeding, by hand ESC-27 SWDM 5.4.2.4 1.00
Sodding, 1" deep, level ground ESC-28 SWDM 5.4.2.5 8.00
Sodding, 1" deep, sloped ground ESC-29 SWDM 5.4.2.5 10.00
TESC Supervisor ESC-30 > 110.00
Water truck, dust control ESC-31 SWDM 5.4.7 5 140.00
Unit
WRITE-IN-ITEMS Reference# Price
Unit
C'(
Each
Each
CY
CY
CY
LF
LF
SY
Each
SY
LF
SY
LF
SY
SY
LF
LF
LF
SY
CY
Each
Each
Each
LF
LF
SY
SY
SY
HR
HR
Unit
EROSION/SEDIMENT SUBTOTAL:
SALES TAX@ 9.5%
EROSION/SEDIMENT TOTAL:
Page 3 of 14
(A)
Quantity Cost
130 845.00
6 213.00
5 10.00
390 585.00
30 45.00
600 2AOO.OO
600 4,800.00
Quantity Cost
8,898.00
845.31
9,743.31
(A)
Unit Prices Updated: 06/14/2016
Version: 02/09/2017
CED Permit#:########
Description
GENERAL ITEMS
Backfill & Compaction-embankment
Backfill & Compaction-trench
Clear/Remove Brush, by hand (SY)
Bollards -fixed
Bollards -removable
Clearing/Grubbing/Tree Removal
Excavation -bulk
Excavation -Trench
Fencing, cedar, 6' high
Fencing, chain link, 4'
Fencing, chain link, vinyl coated, 6' high
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Existing Future Public
Right-of-Way Improvements
IB) (C)
I No. I Unit Price Unit Quant. I Cost Quant. I Cost
Gl-1 $ 6.00 CY
Gl-2 $ 9.00 CY
Gl-3 $ 1.00 SY
Gl-4 $ 240.74 Each
GI-S $ 452.34 Each
Gl-6 $ 10,000.00 Acre
Gl-7 $ 2.00 CY
Gl-8 $ 5.00 CY
Gl-9 $ 20.00 LF
Gl-10 $ 38.31 LF
Gl-11 $ 20.00 LF
Fencing, chain link, gate, vinyl coated, 20' Gl-12 $ 1,400.00 Each
Fill & compact -common barrow Gl-13 $ 25.00 CY
Fill & compact -gravel base Gl-14 $ 27.00 CY
Fill & compact -screened topsoil Gl-15 $ 39.00 CY
Gabion, 12" deep, stone filled mesh Gl-16 $ 65.00 SY
Gabion, 18" deep, stone filled mesh Gl-17 $ 90.00 SY
Gabion, 36" deep, stone filled mesh Gl-18 $ 150.00 SY
Grading, fine, by hand Gl-19 $ 2.50 SY
Grading, fine, with grader Gl-20 $ 2.00 SY
Monuments, 3' long Gl-21 $ 250.00 Each
Sensitive Areas Sign Gl-22 $ 7.00 Each
Sodding, 1" deep, sloped ground Gl-23 $ 8.00 SY
Surveying, line & grade Gl-24 $ 850.00 Day
Surveying, lot location/lines Gl-25 $ 1,800.00 Acre
Topsoil Type A (imported) Gl-26 $ 28.50 CY
Traffic control crew ( 2 flaggers ) Gl-27 $ 120.00 HR
Trail, 4" chipped wood Gl-28 $ 8.00 SY
Trail, 4" crushed cinder Gl-29 $ 9.00 SY
Trail, 4" top course Gi-30 $ 12.00 SY
Conduit, 2" Gl-31 $ 5.00 LF
Wall, retaining, concrete Gl-32 $ 55.00 SF
Wall, rockery Gl-33 $ 15.00 SF
-. -I
)Bl (C]
Page 4 of 14
Private
Improvements
[DI
Quant. Cost
I
)DI
Quantity Remaining
{Bond Reduction)
[El
Quant. I Cost
I
(El
Unit Prices Updated: 06/14/2016
Version: 02/09/2017
I
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
CED Permit#:########
Existing Future Public
Right-of-Way Improvements
(8) ICJ
Description I No. Unit Price Unit Quant. I Cost Quant. I Cost
ROAD IMPROVEMENT/PAVEMENT/SURFACING
AC Grinding, 4' wide machine< lOOOsy Rl-1 $ 30.00 SY
AC Grinding, 4' wide machine 1000-2000sy Rl-2 $ 16.00 SY
AC Grinding, 4' wide machine > 2000sy Rl-3 $ 10.00 SY
AC Removal/Disposal Rl-4 $ 35.00 SY
Barricade, Type Ill ( Permanent) Rl-5 $ 56.00 LF
Guard Rail Rl-6 $ 30.00 LF
Curb & Gutter, rolled Rl-7 $ 17.00 LF
Curb & Gutter, vertical Rl-8 $ 12.50 LF
Curb and Gutter, demolition and disposal Rl-9 $ 18.00 LF
Curb, extruded asphalt Rl-10 $ 5.50 LF
Curb, extruded concrete Rl-11 $ 7.00 LF
Sawcut, asphalt, 3" depth Rl-12 $ 1.85 LF
Sawcut, concrete, per 1" depth Rl-13 $ 3.00 LF
Sealant, asphalt Rl-14 $ 2.00 LF
Shoulder, gravel, 4" thick Rl-15 $ 15.00 SY
Sidewalk, 4" thick Rl-16 $ 38.00 SY
Sidewalk, 4" thick, demolition and disposal Rl-17 $ 32.00 SY
Sidewalk, 5" thick Rl-18 $ 41.00 SY
Sidewalk, 5" thick, demolition and disposal Rl-19 $ 40.00 SY
Sign, Handicap Rl-20 $ 85.00 Each
Striping, per stall Rl-21 $ 7.00 Each
Striping, thermoplastic, { for crosswalk) Rl-22 $ 3.00 SF
Striping, 4" reflectorized line Rl-23 $ a.so LF
Additional 2.5" Crushed Surfacing Rl-24 $ 3.60 SY
HMA 1/2" Overlay LS" Rl-25 $ 14.00 SY
HMA 1/2" Overlay 2" Rl-26 $ 18.00 SY
HMA Road, 2", 4" rock, First 2500 SY Rl-27 $ 28.00 SY
HMA Road, 2", 4" rock, Qty. over 2500SY Rl-28 $ 21.00 SY
HMA Road, 4", 6" rock, First 2500 SY Rl-29 $ 45.00 SY
HMA Road, 4", 6" rock, Qty. over 2500 SY Rl-30 $ 37.00 SY
HMA Road, 4", 4.5" ATB Rl-31 $ 38.00 SY
Gravel Road, 4" rock, First 2500 SY Rl-32 $ 15.00 SY
Gravel Road, 4" rock, Qty. over 2500 SY Rl-33 $ 10.00 SY
Thickened Edge Rl-34 $ 8.60 LF
-· .. -
(B) (C)
Page 5 of 14
Private
Improvements
/D)
Quant. Cost
I
(D)
Quantity Remaining
(Bond Reduction)
IE)
Quant. Cost
(E)
Unit Prices Updated: 06/14/2016
Version: 02/09/2017
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
CED Permit#;########
Description No. I Unit Price I Unit
PARKING LOT SURFACING No.
2" AC, 2" top course rock & 4" borrow PL-1 $ 21.00 SY
2" AC, 1.5" top course & 2.5" base course PL-2 $ 28.00 SY
4" select borrow PL-3 $ S.00 SY
1.5" top course rock & 2.5" base course PL-4 $ 14.00 SY
LANDSCAPING & VEGETATION No.
Street Trees LA-1
Median Landscaping LA-2
Right-of-Way Landscaping LA-3
Wetland landscaping lA-4
-· ·----·· . ···---· -···--. ·----·-·-··
TRAFFIC & LIGHTING No.
Signs TR-1
Street Light System { # of Poles) TR-2
Traffic Signal TR-3
Traffic Signal Modification TR-4
WRITE-IN-ITEMS
§ §
SUBTOTAL WRITE-IN ITEMS:
STREET AND SITE IMPROVEMENTS SUBTOTAL:
Page 6 of 14
SALES TAX@ 9.5%
STREET AND SITE IMPROVEMENTS TOTAL:
Existing Future Public
Right-of-Way Improvements
(8( (CJ
Quant. I Cost Quant. I Cost
I I
(Bl (Cl
I I I
(Bl (Cl
I I
(Bl (Cl
(Bl (Cl
Private
Improvements
ID)
Quant. Cost
I
(DJ
(DI
(DI
(DI
Quantity Remaining
(Bond Reduction)
IE)
Quant. Cost
(EJ
(EJ
[EJ
[El
Unit Prices Updated: 06/14/2016
Version: 02/09/2017
, '
I
I
CED Permit #:########
Description
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Existing Future Public
Right-of-Way Improvements
[Bl [Cl
I No. Unit Price Unit Quant. I Cost Quant. I Cost
Private
Improvements
ID)
Quant. I Cost
DRAINAGE fCPE -Corrull'ated Polvethvlene Pk•e N12 or EC:1uivalentl For Culvert orlces Avera11e of 4' cover was assumed. Assume nerforated PVC is same nrice as solid nine.I
Access Road, R/D D-1 $ 26.DO SY
+--(CBs include frame and lid}
Beehive D-2 $ 90.00 Each
Through-curb Inlet Framework D-3 $ 4DO.DO Each
CB Type 1 D-4 $ 1,500.00 Each 2 3,000.00
CB Type IL D-5 $ 1,750.00 Each
CB Type !I, 48" diameter D-6 $ 2,300.00 Each 1 2,300.00
for additional depth over 4' D-7 $ 480.00 FT 3 1,440.00
CB Type 11, 54" diameter D-8 $ 2,500.00 Each
for additional depth over 4' D-9 $ 495.00 FT
CB Type JI, 60" diameter D-10 $ 2,800.00 Each
for additional depth over 4' D-11 $ 600.00 FT
CB Type JI, 72" diameter D-12 $ 6,000.00 Each
for additional depth over 4' D-13 $ 850.00 FT
CB Type 11, 96" diameter D-14 $ 14,000.00 Each
for additional depth over 4' D-15 $ 925.00 FT
Trash Rack, 12" D-16 $ 350.00 Each
Trash Rack, 15" D-17 $ 410.00 Each
Trash Rack, 18" D-18 $ 480.00 Each
Trash Rack, 21" D-19 $ 550.00 Each
Cleanout, PVC, 4" D-20 $ 150.00 Each
Cleanout, PVC, 6" D-21 $ 170.00 Each 1 170.00
Cleanout, PVC, 8" D-22 $ 200.00 Each
Culvert, PVC, 4" (Not allowed in ROW} 0-23 $ 10.00 LF
Culvert, PVC, 6" (Not allowed in ROW} D-24 $ 13.00 LF 135 1,755.00
Culvert, PVC, 8" (Not allowed in ROW) D-25 $ 15.00 LF
Culvert, PVC, 12" (Not allowed in ROW) D-26 $ 23.00 LF
Culvert, PVC, 15" (Not allowed in ROW) D-27 $ 35.00 LF
Culvert, PVC, 18" (Not allowed in ROW} D-28 $ 41.00 LF
Culvert, PVC, 24" (Not allowed in ROW) D-29 $ 56.00 LF
Culvert, PVC, 30" (Not allowed in ROW) D-30 $ 78.00 LF
Culvert, PVC, 36" (Not allowed in ROW) D-31 $ 130.00 LF
Culvert, CMP, 8" D-32 $ 19.00 LF
Culvert, CM P, 12" D-33 $ 29.00 LF
I 3,740.oo I I I 4,92s.oo I
{Bl (Cl {DI
Pa~e 7 of 14
u.uant1ty Kemainmg
(Bond Reduction)
{El
Quant, I Cost
{E{
Unit Prices Updated: 06/14/2016
Version: 02/09/2017
CED Permit#:########
Description
DRAINAGE (Continued\
Culvert, CMP, 15"
Culvert, CMP, 18"
Culvert, CMP, 24"
Culvert, CMP, 30"
Culvert, CMP, 36"
Culvert, CMP, 48"
Culvert, CMP, 60"
Culvert, CMP, 72"
Culvert, Concrete, 8"
Culvert, Concrete, 12"
Culvert, Concrete, 15 11
Culvert, Concrete, 18"
Culvert, Concrete, 24"
Culvert, Concrete, 30"
Culvert, Concrete, 36"
Culvert, Concrete, 42"
Culvert, Concrete, 48"
Culvert, CPE, 6" (Not allowed in ROW)
Culvert, CPE, 8" (Not allowed in ROW)
Culvert, (PE, 12" (Not allowed in ROW)
Culvert, CPE, 15" (Not allowed in ROW)
Culvert, CPE, 18" (Not allowed in ROW)
Culvert, CPE, 24" (Not allowed in ROW)
Culvert, CPE, 30" (Not allowed in ROW)
Culvert, CPE, 36" (Not allowed in ROW)
Culvert, LCPE, 6"
Culvert, LCPE, 8"
Culvert, LCPE, 12"
Culvert, LCPE, 15"
Culvert, LCPE, 18"
Culvert, LCPE, 24"
Culvert, LCPE, 30"
Culvert, LCPE, 36"
Culvert, LCPE, 48"
Culvert, LCPE, 54"
Page 8 of 14
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Existing Future Public
Right-of-Way Improvements
(BJ ICI
No. I Unit Price I Unit Quant. Cost Quant. Cost
D-34 $ 35.00 LF
D-35 $ 41.00 LF
D-36 $ 56.00 LF
D-37 $ 78.00 Lf
D-38 , 130.00 Lf
D-39 $ 190.00 LF
D-40 $ 270.00 LF
D-41 $ 350.00 LF
D-42 $ 42.00 Lf
D-43 $ 48.00 Lf
D-44 $ 78.00 Lf
D-45 $ 48.00 LF
0-46 $ 78.00 LF
D-47 $ 125.00 Lf
D-48 $ 150.00 LF
D-49 $ 175.00 Lf
D-50 $ 205.00 LF
D-51 $ 14.00 LF
D-52 $ 16.00 LF
D-53 $ 24.00 LF
D-54 $ 35.00 LF
D-55 $ 41.00 Lf
D-56 $ 56.00 LF
D-57 $ 78.00 LF
D-58 $ 130.00 LF
D-59 $ 60.00 LF
D-60 $ 72.00 Lf
D-61 $ 84.00 Lf
D-62 $ 96.00 LF
D-63 $ 108.00 LF
D-64 $ 120.00 Lf
D-65 $ 132.00 LF
D-66 $ 144.00 LF
D-67 $ 156.00 LF
D-68 $ 168.00 LF
(BJ !CJ
Private
Improvements
(DI
Quant. I Cost
(D)
u.uant1ty l\ema1n1ng
(Bond Reduction)
IE)
Quant. I Cost
(E)
Unit Prices Updated: 06/14/2016
Version: 02/09/2017
CED Permit#:########
Description
DRAINAGE {Continued)
Culvert, LCPE, 60"
Culvert, LCPE, 72"
Culvert, HDPE, 6"
Culvert, HDPE, 8"
Culvert, HDPE, 12"
Culvert, HDPE, 15"
Culvert, HDPE, 18"
Culvert, HDPE, 24"
Culvert, HDPE, 30"
Culvert, HDPE, 36"
Culvert, HDPE, 48"
Culvert, HDPE, 54"
Culvert, HOPE, 60"
Culvert, HDPE, 72"
Pipe, Polypropylene, 6"
Pipe, Polypropylene, 8"
Pipe, Polypropylene, 12"
Pipe, Polypropylene, 15"
Pipe, Polypropylene, 18"
Pipe, Polypropylene, 24"
Pipe, Polypropylene, 30"
Pipe, Polypropylene, 36"
Pipe, Polypropylene, 48"
Pipe, Polypropylene, 54"
Pipe, Polypropylene, 60"
Pipe, Polypropvlene, 72"
Culvert, DI, 6"
Culvert, Dl, 8"
Culvert, D!, 12"
Culvert, DJ, 15"
Culvert, Dl, 18"
Culvert, DI, 24"
Culvert, DI, 30"
Culvert, Dl, 36"
Culvert, DJ, 48"
Culvert, DI, 54"
Culvert, DI, 60"
Culvert, DI, 72"
Page 9 of 14
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Existing Future Puui1c
Right-of-Way Improvements
[Bl [C)
I No. Unit Price Unit Quant. I Cost Quant. I Cost
D-69 $ 180.00 LF
D-70 $ 192.00 LF
D-71 $ 42.00 LF
D-72 $ 42.00 LF
D-73 $ 74.00 LF
D-74 $ 106.00 LF
D-75 $ 138.00 LF
D-76 $ 221.00 LF
D-77 $ 276.00 LF
D-78 $ 331.00 LF
D-79 $ 386.00 LF
D-80 $ 441.00 LF
D-81 $ 496.00 LF
D-82 $ 551.00 LF
D-83 $ 84.00 LF
D-84 $ 89.00 LF
D-85 $ 95.00 LF
D-86 $ 100.00 LF
D-87 $ 106.00 LF
D-88 $ 111.00 LF
D-89 $ 119.00 LF
D-90 $ 154.00 LF
D-91 $ 226.00 LF
D-92 $ 332.00 LF
D-93 $ 439.00 LF
D-94 $ 545.00 LF
D-95 $ 61.00 LF 52 3,172.00
D-96 $ 84.00 LF
D-97 $ 106.00 LF
D-98 $ 129.00 LF
D-99 $ 152.00 LF
D-100 $ 175.00 LF
D-101 $ 198.00 LF
D-102 $ 220.00 LF
D-103 $ 243.00 LF
D-104 $ 266.00 LF
D-105 $ 289.00 LF
D-106 $ 311.00 LF
I 3,1n.oo I
(B) [Cl
Private
Improvements
[DI
Quant. I Cost
IOI
u.uant1ty Kema1nmg
{Bond Reduction)
IE)
Quant. Cost
I I
[E)
Unit Prices Updated: 06/14/2016
Version: 02/09/2017
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
CED Permit#:########
Existing Future Puui1c
Right-of-Way Improvements
IB) IC)
Description I No. I Unit Price I Unit Quant. I Cost Quant. I Cost
Saecialtv Drainaee Items
Ditching SD-1 $ 9.50 CY
Flow Dispersal Trench (1,436 base+) SD-3 s 28.00 LF
French Drain (3' depth) SD-4 s 26.00 LF
Geotextile, laid in trench, polypropylene SD-5 $ 3.00 SY
Mid-tank Access Riser, 48" dia, 6' deep SD-6 $ 2,000.00 Each
Pond Overflow Spillway SD-7 $ 16.00 SY
Restrictor/Oil Separator, 12" 50-8 $ 1,150.00 Each
Restrictor/Oil Separator, 15" SD-9 $ 1,350.00 Each
Restrictor/Oil Separator, 18" SD-10 $ 1,700.00 Each
Riprap, placed SD-11 $ 42.00 CY
Tank End Reducer (36" diameter} SD-12 $ 1,200.00 Each
Infiltration pond testing SD-13 $ 125.00 HR
Permeable Pavement SD-14
Permeable Concrete Sidewalk SD-15
Culvert, Box ft X ft SD-16
SUBTOTAL SPECIALTY DRAINAGE ITEMS: I I I
fBI /Cl
STORMWATER FACILITIES llnclude Flow Control and Water oualit, Facilitv Summarv Sheet and Sketch I
Detention Pond SF-1 Each
Detention Tank Sf-2 Each
Detention Vault SF-3 Each
Infiltration Pond Sf-4 Each
Infiltration Tank Sf-5 Each
Infiltration Vault SF-6 Each
Infiltration Trenches SF-7 Each
Basic Biofiltration Swale SF-8 Each
Wet Biofiltration Swale SF-9 Each
Wetpond Sf-10 Each
Wetvault SF-11 Each
Sand Filter SF-12 Each
Sand Filter Vault Sf-13 Each
Linear Sand Filter Sf-14 Each
Stormfilter SF-15 $ 5,500.00 Each
Rain Garden Sf-16 Each
I I I
(B) ICI
PaRe 10 of 14
Private
Improvements
ID)
Quant. I Cost
I I I
ID\
1 5,500.00
I I s,soo.oo I
(DJ
uuant1ty Kemain1ng
fBond Reduction)
IE)
Quant. I Cost
I
'"
I I
IE)
Unit Prices Updated: 06/14/2016
Version: 02/09/2017
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
CED Permit#:########
Existing Future Puo1ic
Right-of-Way Improvements
(B) (Cl
Description No. I Unit Price I Unit Quant. Cost Quant. Cost
WRITE-IN-ITEMS
Wl-1
Wl-2
Wl-3
Wl-4
Wl-5
Wl-6
Wl-7
Wl-8
Wl-9
Wl-10
Wl-11
Wl-12
Wl-13
Wl-14
Wl-15
I I I
DRAINAGE AND STORMWATER FACILITIES SUBTOTAL: I 3,740.00 1
SALES TAX @ 9.5% I 3ss.3o I
DRAINAGE AND STORMWATER FACILITIES TOTAL: I 4,09s.30 1
(B) (Cl
Pai;:e 11 of 14
Private
Improvements
ID\
Quant. Cost
I
I 10,42s.oo 1
I 990.38 I
I 11,41s.3s 1
ID)
L.1.Uant1ty r-;emammg
(Bond Reduction}
IE)
Quant. Cost
I
(E)
Unit Prices Updated: 06/14/2016
Version: 02/09/2017
,
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR WATER
CED Permit#:########
Description No.
Connection to Existing Watermain W-1
Ductile Iron Watermain, CL 52, 4 Inch Diameter W-2
Ductile Iron Watermain, Cl 52, 6 Inch Diameter W-3
Ductile Iron Watermain, CL 52, 8 Inch Diameter W-4
Ductile Iron Watermain, CL 52, 10 Inch Diameter W-5
Ductile Iron Watermain, CL 52, 12 Inch Diameter W-6
Gate Valve, 4 inch Diameter W-7
Gate Valve, 6 inch Diameter W-8
Gate Valve, 8 Inch Diameter W-9
Gate Valve, 10 Inch Diameter W-10
Gate Valve, 12 Inch Diameter W-11
Fire Hydrant Assembly W-12
Permanent Blow-Off Assembly W-13
Air-Vac Assembly, 2-lnch Diameter W-14
Air-Vac Assembly, 1-lnch Diameter W-15
Compound Meter Assembly 3-inch Diameter W-16
Compound Meter Assembly 4-inch Diameter W-17
Compound Meter Assembly 6-inch Diameter W-18
Pressure Reducing Valve Station 8-inch to 10-inch W-19
Page 12 of 14
Unit Price Unit
$ 2,000.00 Each
$ SO.DO LF
$ 56.00 LF
$ 60.00 LF
$ 70.00 LF
$ 80.00 LF
$ 500.00 Each
$ 700.00 Each
$ 800.00 Each
$ 1,000.00 Each
$ 1,200.00 Each
$ 4,000.00 Each
$ 1,800.00 Each
$ 2,000.00 Each
$ 1,500.00 Each
$ 8,000.00 Each
$ 9,000.00 Each
$ 10,000.00 Each
$ 20,000.00 Each
····----··----··
SALES TAX@ 9.5%
WATER TOTAL:
Ex1st1ng Future Puo11c
Right-of-Way Improvements
(B) (CJ
Quant. Cost Quant. Cost
1 2,000.00
I 2,000.001
190.00 J
2,190.00 I
(B) (CJ
Private
Improvements
(0)
Quant. Cost
I
(O)
Quantity Remaining
(Bond Reduction)
IE)
Quant. Cost
I I
(E)
Unit Prices Updated: 06/14/2016
Version: 02/09/2017
I
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR SANITARY SEWER
CED Permit#:########
Description
Clean Outs
Grease Interceptor, 500 gallon
Grease Interceptor, 1000 gallon
Grease Interceptor, 1500 gallon
Side Sewer Pipe, PVC. 4 Inch Diameter
Side Sewer Pipe, PVC. 6 Inch Diameter
Sewer Pipe, PVC, 8 inch Diameter
Sewer Pipe, PVC, 12 Inch Diameter
Sewer Pipe, DI, 8 inch Diameter
Sewer Pipe, DI, 12 Inch Diameter
Manhole, 48 Inch Diameter
Manhole, 54 Inch Diameter
Manhole, 60 Inch Diameter
Manhole, 72 Inch Diameter
Manhole, 96 Inch Diameter
Pipe, C-900, 12 Inch Diameter
Outside Drop
Inside Drop
Sewer Pipe, PVC, Inch Diameter
lift Station (Entire System1
Page 13 of 14
No. Unit Price Unit
SS-1 $ 1,000.00 Each
55-2 $ 8,000.00 Each
55-3 $ 10,000.00 Each
55-4 $ 15,000.00 Each
55-5 $ 80.00 LF
55-6 $ 95.00 LF
55-7 $ 105.00 LF
55-8 $ 120.00 LF
55-9 $ 115.00 LF
55-10 $ 130.00 LF
SS-11 $ 6,000.00 Each
55-13 $ 6,500.00 Each
55-15 $ 7,500.00 Each
SS-17 $ 8,500.00 Each
55-19 $ 14,000.00 Each
55-21 $ 180.00 LF
55-24 $ 1,500.00 LS
55-25 $ 1,000.00 LS
55-26
55-27 LS
C ... tdlT ... DV CLIAILD Cl IDTf"\T"I,
SALES TAX@ 9.5%
SANITARY SEWER TOTAL:
Ex1st1ng
Right-of-Way
(B(
Quant.
40
I
Cost
3,800.00
3,soo.oo I
361.00 J
4,161.00 J
(Bl
Future Puo11c
Improvements
(C)
Quant. Cost
IC)
-
Private u.uanc1 y "ema1n1ng
Improvements (Bond Reduction)
ID)
Quant.
2
130
I
(E)
Cost Quant. Cost
2,000.00
12,350.00
14,3so.oo 1 I
1,363.2s J
1s,113.2s J
(DI {El
Unit Prices Updated: 06/14/2016
Version: 02/09/2017
..,_....-CITY OF e SITE IMPROVEMENT BOND QUANTITY WORKSHEET Renton ~
BOND CALCULATIONS
Planning Division / 1055 South Grady Way-6:n Floor/ Renton, WA 98057 (425) 430-7200
Date: 2/16/2017
Prepared by:
Name: Greg Guillen Project Name:
PE Registration No: PE Registration No. CED Plan# (LUA):
Firm Name: CG Engineering CED Permit# (U):
Firm Address: 250 4th Ave S, Suite 200 Site Address:
Phone No. 425.778.8500 Parcel tt(s):
Email Address: grego@cgengineering.com Project Phase:
CONSTRUCTION BOND AMOUNT•;••
{prior to permit issuance)
Site Restoration/Erosion Sediment Control Subtotal (al 1$ 9,743.31 I
Existing Right-of-Way Improvements Subtotal (bl 1$ 6,1s1.oo I
Future Public Improvements Subtotal
Stormwater & Drainage Facilities (Public & Private) Subtotal (di 1$ 15,510.681
Bond Reduction: f)(isting Right-of-Way Improvements (Quantity (e) Is -I
Remaining) 2
Bond Reduction: Stormwater & Drainage Facilities (Quantity If! I$ -I
Remaining) 2
Site Restoration
p
(a) X 100% 1$ 9,743.31 I
Civil Construction Permit
R
((bx 1SD%) + Id x 100%1) 1$ 25,037.181
Maintenance Bond
Bond Reduction 2 s I$ I -
(e) x 150% +{!}"JOO%
Construction Permit Bond Amount 3 T 1$ 34,780.491
(P+R-5)
Mimmum [)orrd Amourit is $10,000.00
'Estimate Only -May involve multiple and variable componi>nt~. which will be established on an individual basi; by Development En~ineering
Community & Economic
Development
Project Information
Aberdeen Avenue Short Plat
LUA 16-000967
##ffff#ff##
1824 Aberdeen Ave NE
3343901606
FOR APPROVAL
MAINTENANCE BOND'/ ..
{after final acceptance of construction)
(b) 1$ 6,351.00 I
(cl I$ -I
(di 1$ 15,510.681
EST 1 1$ 4,372.341
l(b) + (c) + (d)l X 20%
'The City of Renton allows one request onlv for bond redudion prior to the ma1menancr> period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% will
cover all remaining items to be constructed
3 Required l>ond Amounts are subject to review and mo'11ficat1on by D!'V!'lopment ~ng1neenng.
• Note: The word BOND as used in this noci1ment means any financial guarantee accepto1ble to the City of Renton.
_. Note: All pr[rf>s include labor, equipment, materials, overhe..id and profit
Unit Prices Updated: 06/14/2016
1/n-,;~~· rnlnchn, 7
Aberdeen Ave Subdivision 16037.20
Technical Information Report
February 16, 2017
Section X, Page 1
TIR Section X -Operation and Maintenance Manual
TIR Section X Summary:
Narrative
Maintenance instructions for the proposed flow control BMP is included in the Declaration of Covenant
found in Section IX with a proposed Flow Control BMP site plan. Please note that the site plan is
generated during the design phase and may not reflect all changes made in permitting and construction.
CG Engineering may be contacted for an updated copy of this map once the as-built drawings are
completed for the site.
The project contractor will be responsible for passing along the information in this maintenance manual
to the owner. Upon request by the City, it shall be made available for their inspection.
Facilities shall be inspected for defects. The frequency of this should occur annually. Most maintenance
tasks are generally reactionary to a defect being found, rather than a matter of constant upkeep. It is
generally expected that few to none of these defects will be present upon the yearly inspection of each
facility. Unless otherwise noted on the facility sheets the maintenance tasks should be performed on an
"as needed" basis: (a) when the described defect is visible to whomever performs the yearly inspection,
or (b) should any defect become apparent between inspections.
c:::::
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I t. 425.778.5536
www.cgengineering.com
4 • + civil & structural
ENGINEERING
250 4th Ave s Ste 200
Edmonds, WA 98020
Phone: {425) 778-8500
Fax: (425) 778-5536
engineering & planning
TECHNICAL INFORMATION REPORT
Aberdeen Ave Subdivision
1824 Aberdeen Ave NE
Renton, WA 98056
12/15/2016
CG Project No. 16037.20
Table of Contents
Tl R Section I -Project Overview
TIR Section II -Conditions and Requirements Summary
TIR Section Ill -Off Site Analysis
TIR Section IV -Flow Control and Water Quality Facility Analysis and Design
TIR Section V -Conveyance System Analysis and Design
TIR Section VI -Special Reports and Studies
TIR Section VII -Other Permits
TIR Section VIII -CSWPPP Analysis and Design
TIR Section IX -Bond Quantities, Facility Summaries, and Declaration of Covenant
TIR Section X-Operation and Maintenance Manual
CT?
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425. 778.8soo I t. 425. 778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
TIR Section I Summary
Narrative
TIR Section I -Project Overview
List of Figures: 1. TIR Worksheet
2. Site Location
3. Aerial Photograph Map
December 15, 2016
Section I, Page 1
4. Site Drainage, Drainage Basins, Sub-basins, and Site Characteristics
5. Soils
The project proposes to subdivide a single 16,161 sf parcel in the R-8 zone into 2 individual single-family
lots. The site currently contains one single-family home with a detached garage and a detached
accessory building. The existing structures will be demolished in order to add an access and utility tract,
and a house on the back lot. The project will add more than 2,000 sf of impervious surfaces and will
therefore address Full Drainage requirements from the 2016 King County Surface Water Design Manual.
Lots 1 and 2 will be developed in the future. Stormwater requirements are addressed as part of this
project for the driveway tract and for the future lots.
Address; 1824 Aberdeen Ave NE, Renton, WA 98056
Tax Parcel Number: 334390-1606
The existing lot will be divided as follows:
Proposed Short Plat Coverage
Lot 1: 5,677 sf (0.130 ac)
Lot 2: 7,903 sf (0.181 ac)
Tract: 2,581 sf 10.059 ac)
Total: 16,128 sf (0.370 ac)
Flow Control per Core Requirement #3 must be evaluated for this site because over 5,000 sf of new plus
replaced impervious surface will be created. The project falls within the City's Flow Control Duration
Standard (Forested Conditions). However, the project is exempt from the facility requirement because
there is no more than a 0.1-cfs difference (when modeled using 1 hour time steps) in the 100-year peak
flow. Please see Section IV for the Western Washington Hydrology Model report and assumptions.
Flow Control Best Management Practices (BMPs) must be addressed per Core Requirement #9 to
mitigate stormwater runoff impacts because the site adds and/or replaces more than 2,000 square feet
of impervious surface. Flow Control BMPs were evaluated for the access/utility tract per Section
1.2.9.3.2 "Small Road Improvement and Urban Road Improvement BMP Requirements) and for the
individual lots per Section 1.2.9.2.1 "Small Lot BMP Requirements." A single infiltration trench is
proposed to meet the requirements for the access/utility tract and for both lots. Please see Section IV
for the infiltration trench sizing and assumptions.
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425. 778.8500 I t. 425. 778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20 December 15, 2016
Technical Information Report Section I, Page 2 ·-'----------------------------'-----''--
Figure 1-1: Technical Information Report (TIR) Worksheet
See attached pages.
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I f. 425.778.5536
www.cgengineering.com
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER
Project Owner Prime Metropolis Properties, Inc.
Phone 925.377.8882
Address 950 Taraval St.
San Francisco, CA 94116
Project Engineer Jared Underbrink
Company CG Engineering
Phone 425.778.8500
Part 3 TYPE OF PERMIT APPLICATION
D Landuse (e.g.,Subdivision / Short Subd. / UPD)
0 Building (e.g.,M/F /Commercial/ SFR)
0 Clearing and Grading
0 Right-of-Way Use
~ Other Land Use Permit Master Application
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report
~ Full
Type of Drainage Review D Targeted
(check one): D Simplified
D Large Project
Date (include revision D Directed
dates):
Date of Final:
Part 6 SWDM ADJUSTMENT APPROVALS
Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Name Aberdeen Subdivision
DPER Permit# ----------
Location Township ----=2,,_3 ___ _
Range -----'5'--------
Section __ 5 ____ _
Site Address 1824 Aberdeen Ave NE
Renton, WA 98056
Part4 OTHER REVIEWS AND PERMITS
D DFWHPA D Shoreline
D COE404 Management
D DOE Dam Safety D Structural
RockeryNault/ __ D FEMA Floodplain D ESA Section 7 D COE Wetlands
D Other
Site Improvement Plan (Engr. Plans)
Plan Type (check
[I Full
one): D Modified
D Simplified
Date (include revision
dates):
Date of Final:
Type (circle one): Standard / Experimental I Blanket
Description: (include conditions in TIR Section 2)
Approved Adjustment No. Date of Approval:
2016 Surface Water Design Manual
1
4/2412016
KING COCNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
. Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE LIMITATION/ SITE CONSTRAINT
D Core 2 -Offsite Analysis
D Sensitive/Critical Areas
D SEPA
D LID Infeasibility
D other
D
D Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area)
Threshold Discharge Area: Total Site
(name or description)
Core Requirements (all 8 apply):
Discharge at Natural Location Number of Natural Discharge Locations: 1
Offsite Analysis Level: CD 2 , 3 dated: 01/20/16
Flow Control (include facility Level: 1 (D 3 or Exemption Number 2
summary sheet) Flow Control BMPs Infiltration Trench
Conveyance System Spill containment located at:
Erosion and Sediment Control/ CSWPP/CESCUESC Site Supervisor:
Construction Stormwater
Pollution Prevention
Contact Phone:
After Hours Phone:
Maintenance and Operation Responsibility (circle one): ~/ Public
If Private, Maintenance Log Required: Yes@
Financial Guarantees and Provided: Yes@
Liability
Water Quality (include facility Type (circle one)~ Sens. Lake / Enhanced Basic / Bog
summary sheet) or Exemption No. SURFACE EX. "a"
Landscape Management Plan: Yes@
Special Requirements (as applicable):
Area Specific Drainage Type: CDA I SDO I MOP/ BP/ LMP / Shared Fae. /~
Requirements Name:
Floodplain/Floodway Delineation Type (circle one): Major I Minor I Exemption /~
1 DO-year Base Flood Elevation (or range):
Datum:
Flood Protection Facilities Describe:
2016 Surface Water Design Manual
3
4/24/2016
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN 'V!ANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 15 EASEMENTSffRACTS Part 16 STRUCTURAL ANALYSIS
0 Drainage Easement D Cast in Place Vault
l:EJ Covenant 0 Retaining Wall
0 Native Growth Protection Covenant 0 Rockery> 4' High
0 Tract 0 Structural on Steep Slope
0 Other 0 Other
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
incorporated into this worksheet and«the attached Technical Information Report. To the best of my
knowledge information videol;r e is accurate.
. J /2 /5 h
Signed/Date
4/24/2016 2016 Surface Water Design Manual
5
Aberdeen Ave Subdivision 16037.20
Tec hnica l Information Report
!J %;'1S1
'l :-i 'ilh <;1
N:.W.t,•;.
'>I .B r n f'I
N.:'h)Sl
Gene Coulon
Memorial
Beach Park
The Land ing Ii!)
,, 'f'•
+
ENGINEERING
,• ~;
r ;;·
n
0
5
r-J[ ;.,71:1 St ~-CT
I~
a.
';tl
St-::,
SE 881 11 St
z n
May Creek
Parl<
..
~
111 1824 Aberdun
Avenue Northeast
-< ~< °c. I\,[ p ·/'r·
;
1,.
:!.
7-
cil Fry 's Ele ct ron ics
,1 --
7.'
3
0 :.,
:>.
" t :o
z
Figure 1-2 : Site Location
December 15, 2016
Section I, Page 3
'• -:.:
"' 'f.:. s _ !l ~th 51
t~E f!t li Sl
Sa-
c: :•
;, ,·
"' z ,....
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph . 42S .778.8soo I t. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Info rm at ion Report
• ENGINEERING
Figure 1-3: Aerial Photograph
December 15, 2016
Section I, Page 4
25 0 4th Aven ue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I t . 425.778.5536
www.cgengineering .com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
;z
-!t <
N l~th St3.:
z ~
_gl·l _33.rd S t .
4 N 32nd St
,;;: u 3 1St s.t E N 30tli Sf
aj l~_?Pt h St
~
"t_ROJECT SITE ~ .
Wat ershed
n ame:
O'
\ I
' ' 21
C>
'I,
ENGINEERING
\ N.t 2 cth .SI
<[
NE l &h St
WR IA
numb;;r:
WRLA r ami::
ME J~th St ~
'f 7rh Sr
4-1: 6L~ I'/
Highl a nd s
Park
,Renton
Figure 1-4 : Drainage Basin Map
December 15, 2016
Section I, Page 5
Moy ere
Open Spa
Cedar River/ Lake
Washington
-t th St
8
Cedar-Sammamish
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph . 425.778.8500 I t. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subd ivision 16037.20
Technical I nfo r mat ion Report
Figure 1-5: Soils
December 15, 2016
Section I, Page 6
Unde r lying soi ls were determ i ned us i ng t he Natu r al Resources Conservation Service soil survey tool. The
site contains Indiano la loamy sa nd , S to 15%, corr es ponding to hydro logic so il group "A." A geotechnical
repo r t w ith a recommended infiltration rate is also provided in Section VI.
See attached pages.
4
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I f. 425 .778.5536
www.cgengineeri ng.com
. .. . . .
' . . . ... .. . .
... . . . . .... .t• I -..... • .t• I
..... .1• I ..... -..... . ... •It
.' ... .. ,-
. . --
' ~ .-. . ,,_._ ... · .. ·' , ... ··~· I ~~ ~--: . ..j .. ~ .:.._. .
. ~ W!
o u.a d( -. • -~ .. O T •lill ..
: )> ]~--i
a • _,, • • -., ~ I --
g-( I
~ '
, '
t ;. '· -I
: ; U... lnC •
~
•
. . ·__ ------~---~--------·-----__ )? . • • .
--~ ......
' I
,. ~-r
j, .... •• • ~ I . .. . ··-.....
. ,. . . .... . ,. . --. .... . . ... . ...
• 0 r. • •• I ,l',t ,t• I '·" ,. . ..... . -. . .. , n • • ... ... . ...
! • • ...
,. 1 • • • ••• I :;. r.. • . .. ••• • ,. :... • • •• •· t-.: I t ' . I :•
. . . I • . . .. . ... . ..... " . •fa f
Soil MaJ}--King County Area, Washington
(Aberdeen Ave Subdivision)
MAP LEGEND
Area of Interest (AOI)
Soils
LJ
-.,,
•
Area af Interest (AO!)
Soil Map Unit Polygons
Soil Map Unit lines
Soil Map Unit Points
Special Point Features
12' Blowout
181 Borrow Pit
)( Clay Spot
' '·/ Closed Depression
X Gravel Pit
Gravelly Spot
0 Landfill
A. Lava Flow
..i. Marsh or swamp
11: Minear Quarry
@ Miscellaneous Water
Q Perennial Water
"' Rock Outcrop
+ Saline Spot
Sandy Spot
@ Severely Eroded Spot
0 Sinkhole
i>· Slide or Slip
fJ Sadie Spot
USDA Natural Resources
:iilia Conservation Service
a Spoil Area
;) Stony Spot
(h Very Stony Spot
17 Wel Spot
Ll Other .. Special Line Features
Water Features
Streams and Canals
Transportation
t-+-t Rails
...... Interstate Highways
US Routes
Major Roads
Local Roads
Background
• Aerial Photography
Web Soil Survey
National Cooperative Soil Survey
MAP INFORMATION
The soil surveys that comprise your AOI were mapped at 1 :24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil line
placement. The maps do not show the small areas of contrasting
soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more accurate
calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of
the version date(s) listed below.
Soil Survey Area:
Survey Area Data:
King County Area, Washington
Version 11, Sep 14, 2015
Soil map units are labeled (as space allows) for map scales 1 :50,000
or larger.
Date(s) aerial images were photographed: Aug 31, 2013--0ct 6,
2013
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor shifting
of map unit boundaries may be evident.
11/7/2016
Page 2 of3
Soil Map-King County Area, Washington
Map Unit Legend
Map Unit Symbol
lnC
Totals for Area of Interest
USDA Natural Resources
-Conservation Service
King County Area, Washington (WA633)
Map Unit Name Acres in AOI
Indianola loamy sand, 5 to 15
percent slopes
--
Web Sail Survey
National Cooperative Soil Survey
--
0.8
0.8
Aberdeen Ave Subdivision
Percent of AOI
' 100.0% j
i
100.0%
11 /712016
Page 3 of3
Aberdeen Ave Subdivision 16037.20
Technical Information Report
December 15, 2016
Section II, Page 1
TIR Section II -Conditions and Requirements Summary
TIR Section II Summary
Core Requirements
The proposed project will comply with the 2016 King County Surface Water Design Manual as amended
by the City of Renton (2016 KCSWDM). The project is being submitted for a Full Drainage Review
because it proposes to add and/or replace over 2,000 square feet of impervious area. The project must
comply with all 9 Core Requirements and all 5 Special Requirements. Therefore, the following conditions
are required as specified by the 2016 KCSWDM.
Core Requirements
Core Requirement #1: Discharge at the Natural Location: Discharge will remain at the natural location
and will flow from east to west. There is a public stormwater system in Aberdeen Ave NE that the site
will connect into.
Core Requirement #2: Offsite Analysis: Compliance with this requirement is indicated in Section Ill.
Core Requirement #3: Flow Control: The site is within a Conservation Flow Control Area. However, the
site is exempt from the flow facility requirement per Exception #2 of Section 1.2.3.1.B of the 2016
KCSWDM.
Core Requirement #4: Conveyance System: New pipe systems shall be designed with sufficient capacity
to convey and contain (at minimum) the 25-year peak flow, assuming developed conditions for onsite
tributary areas and existing conditions for any offsite tributary areas.
Core Requirement #5: Erosion & Sediment Control: A Construction Stormwater Pollution Prevention
Plan (CSWPPP) and narrative has been prepared. See Section VIII.
Core Requirement #6: Maintenance & Operations: Maintenance requirements are addressed in Section
X for the flow control BMP.
Core Requirement #7: Financial Guarantees & Liabilities: The project may be required to execute to the
City a construction bond prior to a permit and a maintenance bond prior to acceptance.
Core Requirement #8: Water Quality: Not applicable (Surface Area Exemption "a" in Volume 1, Section
1.2.8). Less than 5,000 square feet of new plus replaced pollution generating impervious surface and
less than% acres of new pollution generating pervious surface are proposed.
Core Requirement #9: Flow Control BMPs: This is discussed in Section IV. An infiltration trench is
proposed to meet the flow control BMP requirement of this project. It was sized to fully infiltrate runoff
from the assumed roof areas of Lots 1 and 2, and from the proposed road surface of the access/utility
tract.
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I t. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
Special Requirements
Special Requirement #1: Other Adopted Requirements: Not applicable.
Special Requirement #2: Flood Hazard Area Delineation: Not applicable.
Special Requirement #3: Flood Protection Facilities: Not applicable.
December 15, 2016
Section II, Page 2
Special Requirement #4: Source Control: Permanent and temporary source Controls are discussed in
Section 8 of this report.
Special Requirement #5: Oil Control: Not applicable.
Special Requirement #6: Aquifer Protection Area: The project is in Zone 2 of the Aquifer Protection Area.
However, the project is not subject to additional requirements because neither open stormwater
facilities nor open conveyance systems are proposed.
cm
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I r. 425.778.5536
www .cge ngi nee ring.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
TIR Section Ill Summary
Narrative
TIR Section Ill -Off Site Analysis
December 15, 2016
Section Ill, Page 3
The site currently contains one single-family home with a detached garage and a detached accessory
building. The existing structures will be demolished in order to add an access and utility tract, and a
house on the back lot. The slope across the lot is downstream from east to west at an average of 4%.
Adjacent lots contain single family residences.
Task 1: Study Area Definition and Maps
The study area is defined as the project site and the area one mile downstream (minimum flow path
distance) from the proposed discharge location for the purposes ofTask 2, and is defined as the
project site and a minimum of one-quarter mile downstream from the proposed discharge location
for the purposes of Tasks 3, 4, and 5.
The drainage basin map can be found in Figure 4 of Section 1. The site is within the East Lake
Washington drainage basin.
Task 2: Resource Review
Drainage and water quality problems and complaints were investigated using the King County iMap
website. None were found within the range of the required downstream analysis. The site does not
appear to contain nor is adjacent to any environmentally sensitive areas.
Task 3: Field Inspection
A site visit was done the morning of 01/20/2016. There did not appear to be any existing drainage
issues. As discovered in the resource review and site photographs, the area downstream from the
site is heavily vegetated and steep.
CT?
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I 1. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Techn ica l Info rmat ion Report
Figure 111-1 View of Aberdeen Ave NE looking south .
Figure 111 -2 View of si te (on left) looking eas t .
ENGINEERING
Decem b er 15, 2016
Section Il l, Pa ge 4
250 4th Avenue South, Suite 200
Ed monds, WA 98020
ph . 425.778.8 500 I t. 425.778.553 6
www.cgengineering.com
Abe rd een Ave Subdivision 16037.20
Technical Info rmation Report
Figure 111-3 View of Aberdee n Ave NE looking north .
Figure 111 -4 View from back of site looking west.
+
ENGINEERING
December 15, 2016
Section Ill, Pag e 5
250 4th Avenue South, Suite 200
Edmonds, WA 9 80 20
ph. 425.778 .8500 I f. 425.778.S536
www.cgengineering .com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
Task 4: Drainage System Description and Problem Descriptions
December 15, 2016
Section Ill, Page 6
No drainage problems are expected. The existing conveyances adjacent to the site include an
18" public storm main on the western frontage of Aberdeen Ave NE. Site runoff is expected to
flow in the existing condition from east to west and connect into this system.
Task 5: Mitigation of Existing or Potential Problems
No existing drainage problems were discovered.
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425. 778.8500 I 1. 425. 778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
December 15, 2016
Section IV, Page 1
TIR Section IV -Flow Control and Water Quality Facility
Analysis and Design
TIR Section IV Summary:
Narrative
PART A: Existing Site Hydrology
PART 8: Developed Site Hydrolagy
PART C: Performance Standards
PART D: Flow Control System
PART E: Water Quality System
WWHM2012 Report
PART A: EXISTING SITE HYDROLOGY
The 2012 Western Washington Hydrology Model (WWHM) was used to model flow control. Per the City
of Renton's Flow Control Application Map (Reference 11-A in the King County Manual), the site is within
the Flow Control Duration Standard (Forested Condition).
The predeveloped land coverage is as follows:
Pervious Areas
Forest. Flat, A/B:
Total:
PART B: DEVELOPED SITE HYDROLOGY
16,128 sf {0.370 ac)
16,128 sf (0.370 ac)
In the proposed condition, the existing lot will be subdivided into 2 lots and existing structures will be
demolished. Impervious areas were assumed for the proposed lots according to Section 3.2 of the 2016
KCSWDM since Lot 1 and Lot 2 will be developed in the future. Per Section 3.2, the assumed impervious
coverage "shall not be less than 4,000 sf per lot or the maximum impervious coverage permitted by
code (K.C.C. 21A.12.030), whichever is less." The maximum impervious coverage allowed per code for
the zoning (R-8) is 75%, or 4,257 sf and 5,927 sf for Lot 1 and Lot 2, respectively. The assumed
impervious coverage shall be 75% and the maximum building coverage shall be 50% for the purposes of
this hydrology model.
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425. 778.8soo I 1. 42s. 778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037 .20
Technical Information Report
The assumed developed lot coverage is as follows:
Assumed Lot 1 Developed Lot Coverage
Pervious Areas
Landscaping. Flat. A/B: 1.420 sf (0.032 ac)
Total: 1,420 sf (0.032 ac)
Impervious Areas
Roof, Flat:
Driveway/Walkways, Flat:
Total:
Assumed Lot 2 Developed Lot Coverage
Pervious Areas
Landscaping. Flat. A/B:
Total:
Impervious Areas
Roof, Flat:
Driveway/Walkways, Flat. A/B:
Total:
2,838 sf (0.065 ac)
1,976 sf {0.033 ac)
4,257 sf (0.130 ac)
1.976 sf (0.045 ac)
1,976 sf (0.045 ac)
3,951 sf (0.091 ac)
1.976 sf (0.045 ac)
5,927 sf (0.136 ac)
Assumed Tract Developed Lot Coverage
Impervious Areas
Driveway. Flat, A/B: 2,581 sf (0.059 ac)
Total: 2,581 sf (0.059 ac)
December 15, 2016
Section IV, Page 2
The proposed Flow Control BMP is an Infiltration Trench per Section 5.2 of the 2016 KCSWDM. An
infiltration design rate of 7.35 in/hr was determined for the site (see Section VI for the geotechnical
report). The trench was sized to be 80'x5'x2' deep and will be sited in the access/utility tract. Surface
water will be directed from the roofs of Lots 1 and 2, and from the access/utility tract.
PART C: PERFORMANCE STANDARDS
1. Area-Specific Flow Control Facility standard:
The site is within the City of Renton's Flow Control Duration Standard (Forested Conditions).
2. Flow Control BM Ps:
Flow Control BMP Implementation requirements were determined from Section 1.2.9.3.1 "Small
Subdivision and Urban Subdivision Projects BMP Requirements." BMPs for plat infrastructure
improvements (driveway tract) were evaluated per Section 1.2.9.3.2 "Small Road Improvement
and Urban Road Improvement Project BMP Requirements." BMPs for the future development of
the two individual lots were evaluated per Section 1.2.9.2.1 "Small Lot BMP Requirements."
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I t. 425.778.SS36
www .cge ngi neeri ng.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
3. Conveyance System Capacity Standards:
December 15, 2016
Section IV, Page 3
New pipe systems shall be designed with sufficient capacity to convey and contain (at minimum)
the 25-year peak flow, assuming developed conditions for onsite tributary areas and existing
conditions for any offsite tributary areas.
4. Area-Specific Water Quality Treatment Menu:
Lot 1, Lot 2, and the access/utility tract are evaluated individually for this requirement. Each lot
meets the Surface Area Exemption of Core Requirement #8 and therefore the Area-Specific
Water Quality Treatment is not required.
PART D: FLOW CONTROL SYSTEM
An infiltration trench is proposed to meet the flow control BMP requirement of this project. The trench
will be 80' x 5' x 2' deep and will be sited within the access/utility tract. The design infiltration rate used
was 7.35 in/hr per the geotechnical report found in Section VI. It was sized to fully infiltrate runoff from
the assumed roof areas of Lots 1 and 2, and from the proposed road surface of the access/utility tract.
BMPs must be implemented for 10% of the site/lot for sites/lots up to 11,000 sf per Section 1.2.9.2.1
"Small Lot BMP Requirements." The assumed roof area is 50% of each lot (see Part B), and should
therefore meet this requirement. Runoff from all of the impervious surfaces of the access/utility tract
will be infiltrated per the requirement that all target surfaces must be mitigated to the maximum extent
feasible from the list in Section 1.2.9.3.2 "Small Road Improvement and Urban Road Improvement
Projects BMP Requirements."
The project is exempt from the facility requirement of Core Requirement #3: Flow Control per Exception
#2 of Section 1.2.3.1.B of the 2016 KCSWDM because the 100-year peak flow is no more than 0.1 cfs
(when modeled using 1 hour time steps). Please see the WWHM summary. The model includes the
infiltration trench.
PART E: WATER QUALITY SYSTEM
The project does not propose a water quality system per Part C.
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I 1. 425.778.5536
www.cgengineering.com
WWHM2012
PROJECT REPORT
General Model Information
Project Name: Aberdeen Ave 12.15.16
Site Name: Aberdeen Ave Subdivision
Site Address: 1824 Aberdeen Ave NE
City: Renton
Report Date: 12/15/2016
Gage: Seatac
Data Start: 1948/10/01
Data End: 2009/09/30
Timestep: 15 Minute
Precip Scale: 1.00
Version: 2014/01/22
POC Thresholds
Low Flow Threshold for POC1:
High Flow Threshold for POC1:
Aberdeen Ave 12.15.16
50 Percent of the 2 Year
50 Year
12/15/2016 3:47:39 PM Page 2
Landuse Basin Data
Predeve/oped Land Use
Basin 1
Bypass: No
GroundWater: No
Pervious Land Use Acres
A B, Forest, Flat 0.37
Pervious Total 0.37
Impervious Land Use Acres
Impervious Total 0
Basin Total 0.37
Element Flows To:
Surface lnterflow
Aberdeen Ave 12.15.16
Groundwater
1211512016 3:47:39 PM Page 3
Mitigated Land Use
Driveway Tract
Bypass: No
GroundWater: No
Pervious Land Use Acres
Pervious Total 0
Impervious Land Use Acres
DRIVEWAYS FLAT 0.059
Impervious Total 0.059
Basin Total 0.059
Element Flows To:
Surface lnterflow Groundwater
Gravel Trench Bed 1 Gravel Trench Bed 1
Aberdeen Ave 12.15.16 12/15/2016 3:47:39 PM Page 4
Lot 1 Roof
Bypass: No
GroundWater: No
Pervious Land Use Acres
Pervious Total 0
Impervious Land Use Acres
ROOF TOPS FLAT 0.065
Impervious Total 0.065
Basin Total 0.065
Element Flows To:
Surface lnterflow Groundwater
Gravel Trench Bed 1 Gravel Trench Bed 1
Aberdeen Ave 12.15.16 12/15/2016 3:47:39 PM Page 5
Lot 2 Roof
Bypass: No
GroundWater: No
Pervious Land Use Acres
Pervious Total 0
Impervious Land Use Acres
ROOF TOPS FLAT 0.091
Impervious Total 0.091
Basin Total 0.091
Element Flows To:
Surface lnterflow Groundwater
Gravel Trench Bed 1 Gravel Trench Bed 1
Aberdeen Ave 12.15.16 12/15/2016 3:47:39 PM Page 6
Lot 1 and Lot 2 Runoff
Bypass: Yes
GroundWater: No
Pervious Land Use Acres
AB, Lawn, Flat 0.093
Pervious Total 0.093
Impervious Land Use Acres
DRIVEWAYS FLAT 0.062
Impervious Total 0.062
Basin Total 0.155
Element Flows To:
Surface lnterflow Groundwater
Aberdeen Ave 12.15.16 12/15/2016 3:47:39 PM Page 7
Mitigated Routing
Gravel Trench Bed 1
Bottom Length:
Bottom Width:
Trench bottom slope 1:
Trench Left side slope 0:
Trench right side slope 2:
Material thickness of first layer:
Pour Space of material for first layer:
Material thickness of second layer:
Pour Space of material for second layer:
Material thickness of third layer:
Pour Space of material for third layer:
Infiltration On
Infiltration rate:
Infiltration safety factor:
Total Volume Infiltrated (ac-ft):
Total Volume Through Riser (ac-ft):
Total Volume Through Facility (ac-ft):
Percent Infiltrated:
Discharge Structure
Riser Height: 1.8 ft.
Riser Diameter: 18 in.
Element Flows To:
Outlet 1 Outlet 2
Gravel Trench Bed Hydraulic Table
Stage(ft)
0.0000
0.0222
0.0444
0.0667
0.0889
0.1111
0.1333
0.1556
0.1778
0.2000
0.2222
0.2444
0.2667
0.2889
0.3111
0.3333
0.3556
0.3778
0.4000
0.4222
0.4444
0.4667
0.4889
0.5111
0.5333
0.5556
Area(ac)
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
Volume(ac-ft)
0.000
0.000
0000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
80.00 ft.
5.00 ft.
0.001 To 1
0 To 1
0 To 1
2
0.3
0
0
0
0
7.35
1
33.254
0
33.254
100
Discharge(cfs) lnfilt(cfs)
0.000 0.000
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
0.000 0.068
Aberdeen Ave 12.15.16 12/15/2016 3:47:39 PM Page 9
0.5778 0.009 0.001 0.000 0.068
0.6000 0.009 0.001 0.000 0.068
0.6222 0.009 0.001 0.000 0.068
0.6444 0.009 0.001 0.000 0.068
0.6667 0.009 0.001 0.000 0.068
0.6889 0.009 0.001 0.000 0.068
0. 7111 0.009 0.002 0.000 0.068
0.7333 0.009 0.002 0.000 0.068
0.7556 0.009 0.002 0.000 0.068
0.7778 0.009 0.002 0.000 0.068
0.8000 0.009 0.002 0.000 0.068
0.8222 0.009 0.002 0.000 0.068
0.8444 0.009 0.002 0.000 0.068
0.8667 0.009 0.002 0.000 0.068
0.8889 0.009 0.002 0.000 0.068
0.9111 0.009 0.002 0.000 0.068
0.9333 0.009 0.002 0.000 0.068
0.9556 0.009 0.002 0.000 0.068
0.9778 0.009 0.002 0.000 0.068
1.0000 0.009 0.002 0.000 0.068
1.0222 0.009 0.002 0.000 0.068
1.0444 0.009 0.002 0.000 0.068
1.0667 0.009 0.002 0.000 0.068
1.0889 0.009 0.003 0.000 0.068
1.1111 0.009 0.003 0.000 0.068
1.1333 0.009 0.003 0.000 0.068
1.1556 0.009 0.003 0.000 0.068
1.1778 0.009 0.003 0.000 0.068
1.2000 0.009 0.003 0.000 0.068
1.2222 0.009 0.003 0.000 0.068
1.2444 0.009 0.003 0.000 0.068
1.2667 0.009 0.003 0.000 0.068
1.2889 0.009 0.003 0.000 0.068
1.3111 0.009 0.003 0.000 0.068
1.3333 0.009 0.003 0.000 0.068
1.3556 0.009 0.003 0.000 0.068
1.3778 0.009 0.003 0.000 0.068
1.4000 0.009 0.003 0.000 0.068
1.4222 0.009 0.003 0.000 0.068
1.4444 0.009 0.004 0.000 0.068
1.4667 0.009 0.004 0.000 0.068
1.4889 0.009 0.004 0.000 0.068
1.5111 0.009 0.004 0.000 0.068
1.5333 0.009 0.004 0.000 0.068
1.5556 0.009 0.004 0.000 0.068
1.5778 0.009 0.004 0.000 0.068
1.6000 0.009 0.004 0.000 0.068
1.6222 0.009 0.004 0.000 0.068
1.6444 0.009 0.004 0.000 0.068
1.6667 0.009 0.004 0.000 0.068
1.6889 0.009 0.004 0.000 0.068
1. 7111 0.009 0.004 0.000 0.068
1.7333 0.009 0.004 0.000 0.068
1.7556 0.009 0.004 0.000 0.068
1.7778 0.009 0.004 0.000 0.068
1.8000 0.009 0.005 0.000 0.068
1.8222 0.009 0.005 0.000 0.068
1.8444 0.009 0.005 0.000 0.068
Aberdeen Ave 12.15.16 12/15/2016 3:47:39 PM Page 10
1.8667 0.009 0.005 0.000 0.068
1.8889 0.009 0.005 0.000 0.068
1.9111 0.009 0.005 0.000 0.068
1.9333 0.009 0.005 0.000 0.068
1.9556 0.009 0.005 0.000 0.068
1.9778 0.009 0.005 0.000 0.068
2.0000 0.009 0.005 0.000 0.068
Aberdeen Ave 12.15.16 12/15/2016 3:47:39 PM Page 11
Analysis Results
POC 1
,oo
I 000 f-----1--------------
~ 000
IL ooo
0.0010E-5
000
;; £ 0.00
~ 000
J
IL ,oo
1CE-4 10E·3 lOE-2 lOE-1
r ... .-c.,.nt Tim ... Ex.c: ... ..,din9
rn
w
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area: 0.37
Total Impervious Area: O
Mitigated Landuse Totals for POC #1
Total Pervious Area: 0.093
Total Impervious Area: 0.277
Flow Frequency Method: Log Pearson Type Ill 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.000314
5 year 0.000475
10 year 0.000606
25 year 0.000803
50 year 0.000975
100 year 0.00117
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.024159
5 year 0.031687
10 year 0.037171
25 year 0.044689
50 year 0.050732
100 year 0.057169
Annual Peaks
Aberdeen Ave 12.15.16 12/15/2016 3:47:39 PM Page 12
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.000 0.031
1950 0.001 0.034
1951 0.001 0.022
1952 0.000 0.017
1953 0.000 0.018
1954 0.000 0.020
1955 0.000 0.022
1956 0.000 0.021
1957 0.000 0.024
1958 0.000 0.020
1959 0.000 0.020
1960 0.000 0.020
1961 0.000 0.021
1962 0.000 0.018
1963 0.000 0.021
1964 0.000 0.020
1965 0.000 0.026
1966 0.000 0.017
1967 0.000 0.032
1968 0.000 0.033
1969 0.000 0.023
1970 0.000 0.022
1971 0.000 0.026
1972 0.002 0.033
1973 0.000 0.016
1974 0.000 0.024
1975 0.000 0.028
1976 0.000 0.019
1977 0.000 0.020
1978 0.000 0.025
1979 0.000 0.034
1980 0.000 0.030
1981 0.000 0.025
1982 0.000 0.035
1983 0.000 0.028
1984 0.000 0.018
1985 0.000 0.025
1986 0.000 0.021
1987 0.000 0.033
1988 0.000 0.020
1989 0.000 0.025
1990 0.000 0.061
1991 0.000 0.039
1992 0.000 0.018
1993 0.000 0.015
1994 0.000 0.017
1995 0.000 0.022
1996 0.002 0.029
1997 0.000 0.025
1998 0.000 0.023
1999 0.000 0.047
2000 0.000 0.023
2001 0.000 0.026
2002 0.000 0.030
2003 0.000 0.024
2004 0.000 0.044
Aberdeen Ave 12.15.16 12/15/2016 3:48:44 PM Page 13
2005
2006
2007
2008
2009
0.000
0.000
0.003
0.000
0.000
Ranked Annual Peaks
0.020
0.020
0.060
0.038
0.031
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.0031 0.0609
2 0.0021 0.0596
3 0.0015 0.0470
4 0.0006 0.0439
5 0.0006 0.0386
6 0.0005 0.0377
7 0.0005 0.0348
8 0.0003 0.0337
9 0.0003 0.0336
10 0.0003 0.0330
11 0.0003 0.0330
12 0.0003 0.0328
13 0.0003 0.0324
14 0.0003 0.0310
15 0.0003 0.0306
16 0.0003 0.0302
17 0.0003 0.0300
18 0.0003 0.0287
19 0.0003 0.0284
20 0.0003 0.0276
21 0.0003 0.0263
22 0.0003 0.0258
23 0.0003 0.0257
24 0.0003 0.0250
25 0.0003 0.0249
26 0.0003 0.0247
27 0.0003 0.0246
28 0.0003 0.0246
29 0.0003 0.0244
30 0.0003 0.0240
31 0.0003 0.0238
32 0.0003 0.0235
33 0.0003 0.0229
34 0.0003 0.0228
35 0.0003 0.0220
36 0.0003 0.0219
37 0.0003 0.0219
38 0.0003 0.0218
39 0.0003 0.0215
40 0.0003 0.0214
41 0.0003 0.0208
42 0.0003 0.0206
43 0.0003 0.0203
44 0.0003 0.0201
45 0.0003 0.0201
46 0.0003 0.0201
47 0.0003 0.0200
48 0.0003 0.0198
49 0.0003 0.0198
Aberdeen Ave 12.15.16 12/15/2016 3:48:44 PM Page 14
50
51
52
53
54
55
56
57
58
59
60
61
0.0003
0.0003
0.0003
0.0003
0.0003
0.0003
0.0003
0.0003
0.0003
0.0002
0.0002
0.0002
Aberdeen Ave 12.15.16
0.0197
0.0196
0.0188
0.0184
0.0181
0.0180
0.0177
0.0171
0.0168
0.0167
0.0164
0.0153
12/15/2016 3:48:44 PM Page 15
Model Default Modifications
Total of O changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
Aberdeen Ave 12.15.16 12/15/2016 3:49:03 PM Page 20
Appendix
Predeveloped Schematic
asm 1
1 .37ac
Aberdeen Ave 12.15.16 12/15/2016 3:49:03 PM Page 21
Mitigated Schematic
ravel
rench Bed 1
Aberdeen Ave 12.15.16 12/15/2016 3:49:03 PM Page 22
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright© by: Clear Creek Solutions, Inc. 2005-2013; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1 (866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
Aberdeen Ave 12.15.16 1211512016 3:49:03 PM Page 40
Aberdeen Ave Subdivision 16037.20
Technical Information Report
December 15, 2016
Section V, Page 1
TIR Section V-Conveyance System Analysis and Design
TIR Section V Summary:
Narrative
Per Core Requirement #4, new pipe systems shall be designed with sufficient capacity to convey and
contain the 25-year peak flow. Conveyance capacity shall be demonstrated using the methods in
Chapter 4 of the KCSWDM.
Verification of capacity and performance must be provided for each element of the conveyance system.
The analysis must show design velocities and flows for all drainage facilities within the development, as
well as those offsite that are affected by the development.
The conveyance system will consist of 6" PVC pipes for roof and driveway runoff. The 25-year peak flow
for the total runoff from the assumed impervious areas runoff was calculated per WWHM and found to
be 0.107 cfs. The conveyance capacity of a 6" PVC pipe with a minimum 1% slope is 0.56 cfs. Therefore,
a 6" PVC pipe is sufficient for the design event.
See the conveyance capacity calculation on the following page.
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I f. 42S.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
Ratimw Methacl -De<eloped Conditions
far: Aberdeen A,e Subdirision
Mannings Equation: lA~ ·1• 1/" Q=(-)R• S • n
n= Ul3
Con,evance r.,.nadl ·
4-inch 6-inch 3-inch 10-lnch
Slope (hilt)
O.INIS 0.13 0.40 0.87 1.55
0.010 0.19 11.56 1.23 2.20
0.015 0.23 0.69 1.50 2.69
o..ozo 0.27 0.79 1.74 3.11
0.025 030 0.89 1.94 3.47
O.ll30 033 0.97 2.13 3.81
0.035 036 1.05 230 4.11
0.040 03S 1.12 2.46 439
0.045 0.40 1.19 2.60 4.66
0.050 0.43 126 2.75 4.91
0.055 0.45 132 2.88 5.15
0.060 0.47 13S 3.01 53&
0.065 0.49 1.43 3.13 5.60
0.070 050 1.49 3.25 5.81
0.075 052 1.54 336 6.02
0.080 054 159 3.47 6.21
0.085 056 1.64 358 6.40
0.090 057 1.68 3.68 659
0.095 059 1.73 3.78 6.77
0.100 0.60 1.78 3.88 6.95
C: E::io Convevance Caoadtv -ENGINeeRING
250 4th Ave. South
Suile 200
Edmonds, WA 98020 Aberdeen Ave Subdivision
c::;
ENGINEERING
12-inch
252
3.57
437
5.05
5.65
6.18
6.68
7.14
757
7.98
S37
8.75
9.10
9.45
9.78
10.10
10.41
10.71
11.01
11.29
By
"""'
""'
~!lo.
VD """
"""
N.T.S. .,_,.._
·16037
.20
December 15, 2016
Section V, Page 2
1211212016
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 J f. 42S.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
December 15, 2016
Section VI, Page 1
TIR Section VI -Special Reports and Studies
TIR Section VI Summary:
Narrative
Please refer to the following reports submitted with the application:
1. Geotechnical Engineering Evaluation by Nelson Geotechnical Associates, Inc., dated October 17,
2016.
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I 1. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20 December 15, 2016
Technical Information Report Section VII, Page 1 ----------''--------------------------~·
TIR Section VII
Narrative
TIR Section VII -Other Permits
Other permits are not anticipated that would contain more restrictive drainage plan requirements.
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I f. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
December 15, 2016
Section VIII, Page 1
TIR Section VIII -CSWPPP Analysis and Design
TIR Section VIII Summary
Narrative
This section of the TIR is to provide a summary of erosion controls and source controls for the site.
The project proposes to subdivide a single 16,161 sf parcel in the R-8 zone into 2 individual single-family
lots. The site currently contains one single-family home with a detached garage and a detached
accessory building. The existing structures will be demolished in order to add an access and utility tract,
and a house on the back lot. The project will add more than 2,000 sf of impervious surfaces and so must
meet the Full Drainage requirements from the 2016 King County Surface Water Design Manual as
amended by the City of Renton. The project will construct the necessary stormwater improvements for
the access/utility tract and lots, but development of Lots 1 and 2 will occur at a later date.
ESC and SWPPS measures were chosen per Section D.2 the 2016 King County Surface Water Design
Manual. Less than 1 acre of land will be disturbed and therefore the Department of Ecology SWPPP and
Construction Stormwater General Permit is not required.
ESC Measures
The following ESC measures are suggested for each category below:
1. Clearing Limits:
To protect adjacent properties, existing trees, and to reduce the area of soil exposed to
construction, the limits of construction will be clearly marked before land-disturbing activities begin.
The BMPs relevant to marking the clearing limits that will be applied for this project include:
• High Visibility Plastic or Metal Fence
2. Cover Measures
Exposed and unworked soils shall be stabilized with the application of effective BMPs to prevent
erosion throughout the life of the project. Temporary cover shall be installed if an area is to remain
unworked for more than seven days during the dry season (May 1 to September 30) or for more
than two consecutive working days during the wet season (October 1 to April 30). The suggested
BMPs for soil stabilization that shall be used on this project include:
• Temporary & Permanent Seeding
• Mulching
• Nets & Blankets
• Plastic Covering
3. Perimeter Protection
All stormwater runoff from disturbed areas shall pass through an appropriate sediment removal
BMP before leaving the construction site or prior to being discharged. Silt fences will be installed on
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I 1. 425.778.5536
www.cgenglneering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
December 15, 2016
Section VIII, Page 2
the downstream sides of the site. The specific BMPs to be used for controlling sediment on this
project include:
• Silt Fence
4. Traffic Area Stabilization
A stabilized construction entrance will be established to the west side ofthe site using the existing
gravel driveway.
• Stabilized Construction Entrance
5. Sediment Retention
The site is small enough that perimeter protection is expected to be adequate for sediment
retention onsite.
6. Surface Water Collection
The site is small enough that perimeter protection is expected to be adequate for sediment
retention onsite.
7. Dewatering Control
Dewatering is not anticipated.
8. Dust Control
Dust control will be used to minimize wind transport of soil. Water and/or other dust control
measures may be used upon approval by the County.
• Dust Control
9. Flow Control
Increases in the 2-year and 10-year runoff event is expected to be small due to the size of the site.
Flow control measures are not proposed.
10. Protect Existing and Proposed Flow Control BMPs
Stormwater facilities and on-site BMPs areas are identified on the Temporary Erosion Control Plan.
These areas shall be protected from sedimentation and soil compaction that would adversely affect
infiltration.
11. Maintain BMPs
BMPs will be maintained and repaired as necessary throughout construction. The CSWPP supervisor
shall review the site for ESC and SWPPS at least weekly and within 24 hours of significant storms. All
temporary erosion and sediment control BMPs will be removed within 30 days after achieving final
site stabilization.
12. Manage the Project
Projects shall assign a qualified CSWPPP supervisor to be the primary contact for ESC and SWPPP
issues and reporting.
E5
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I t. 425.778.5536
www .cge ngi nee ring.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
SWPPS Measures
The following SWPPS measures are expected for the site.
1. Concrete Handling
December 15, 2016
Section VIII, Page 3
Management practices per Section D.2.2.1 "Concrete Handling" shall be utilized any time concrete is
used to minimize and eliminate concrete, concrete process water, and concrete slurry runoff.
2. Concrete Washout Area
Prevent or reduce the discharge of pollutants to stormwater from concrete waste by conducting
washout off-site, or performing on-site washout in a designated area to prevent pollutants from
entering surface waters or ground water.
3. Sawcutting and Surfacing Pollution Prevention
Utilize these management practices anytime sawcutting or surfacing operations take place.
Sawcutting and surfacing operations include, but are not limited to, sawing, coring, grinding,
roughening, hydrodemolition, bridge and road surfacing.
4. Material Delivery, Storage and Containment
These procedures are suitable for use at all construction sites with delivery and storage of the
following materials: Petroleum products such as fuel, oil and grease; Soil stabilizers and binders
(e.g. Polyacrylamide); Fertilizers, pesticides and herbicides; Detergents; Asphalt and concrete
compounds; Hazardous chemicals such as acids, lime, adhesives, paints, solvents and curing
compounds; Any other material that may be detrimental if released to the environment.
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I t. 425.778.5536
www.cgengineering.com
Aberdeen Ave Subdivision 16037.20
Technical Information Report
December 15, 2016
Section IX, Page 1
TIR Section IX -Bond Quantities, Facility Summaries, and
Declaration of Covenant
TIR Section IX Summary:
Narrative
A Declaration of Covenant is provided for the proposed flow control BMP.
There are no flow control facilities.
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.ssoo I f. 425.778.5536
www.cgengineering.com
RECORDING REQUESTED BY AND
WIIEN RECORDED MAIL TO:
CITY CLERK'S OFFICE
CITY OF RENTON
1055 SOUTH GRADY WAY
RENTON WA 98057
DECLARATION OF COVENANT
FOR MAINTENANCE AND INSPECTION OF FLOW CONTROL BMPS
Grantor: ____________ _
Grantee: City of Renton
L ID . 1. THAT PORTION OF TRACT 244 INC D HILLMAN'S LAKE ega escnp ton: _________________________ ~
WASHINGTON GARDEN OF EDEN ADDITION TO SEATTLE DIVISION NO 4,
ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 11 OF PLATS,
. . LAST PAGE Add1t10nal Legal(s) on: _______________________ _
334390-1606 Assessor's Tax Parcel ID#: ______________________ _
IN CONSIDERATION of the approved City of Renton(check one of the following) D residential
building permit, D commercial building permit, D clearing and grading permit, D subdivision pennit, or
~ short subdivision permit for Application File No. LUA/SWP ________ relating to the
real property ("Property") described above, the Grantor(s), the owner(s) in fee of that Property, hereby
covenants(covenant) with City or Renton, a political subdivision of the state of Washington, that
he/she(they) will observe, consent to, and abide by the conditions and obligations set forth and described
in Paragraphs I through 8 below with regard to the Property. Grantor(s) hereby grants(grant),
covenants(covenant), and agrees(agree) as follows:
1. Grantor(s) or his/her(their) successors in interest and assigns ("Owners") shall retain, uphold,
and protect the stormwater management devices, features, pathways, limits, and restrictions, known as
flow control best management practices ("BMPs"), shown on the approved Flow Control BMP Site Plan
for the Property attached hereto and incorporated herein as Exhibit A.
2. The Owners shall at their own cost, operate, maintain, and keep in good repair, the Property's
BMPs as described in the approved Design and Maintenance Details for each BMP attached hereto and
incorporated herein as Exhibit B.
3. City or Renton shall provide at least 30 days written notice to the Owners that entry on the
Property is planned for the inspection of the BMPs. After the 30 days, the Owners shall allow the City of
Renton to enter for the sole purpose of inspecting the BMPs. In lieu of inspection by the City, the
Owners may elect to engage a licensed civil engineer registered in the state of Washington who has
expertise in drainage to inspect the BMPs and provide a written report describing their condition, If the
engineer option is chosen, the Owners shall provide written notice to the City of Renton within fifteen
days of receiving the City's notice of inspection. Within 30 days of giving this notice, the Owners, or the
engineer on behalf of the Owners, shall provide the engineer's report to the City of Renton. lf the report
is not provided in a timely manner as specified above, the City of Renton may inspect the BMPs without
further notice,
4. If the City determines from its inspection, or from an engineer's report provided in accordance
with Paragraph 3, that maintenance, repair, restoration, and/or mitigation work is required for the BMPs,
The City shall notify the Owners of the specific maintenance, repair, restoration, and/or mitigation work
(Work) required under RMC 4-6-030. The City shall also set a reasonable deadline for completing the
Work or providing an engineer's report that verifies completion of the Work. After the deadline has
passed, the Owners shall allow the City access to re-inspect the 13MPs unless an engineer's report has
been provided verifying completion of the Work. Jfthe work is not completed properly within the time
frame set by the City, the City may initiate an enforcement action. failure to properly maintain the BMPs
is a violation of RMC 4-6-030 and may subject the Owners to enforcement under the RMC 1-3, including
fines and penalties.
5. Apart from performing routine landscape maintenance, the Owners are hereby required to
obtain written approval from the City or Renton before performing any alterations or modifications to the
BMPs.
6. Any notice or approval required to be given by one pmty to the other under the provisions of
this Declaration of Covenant shall be effective upon personal delivery to the other party, or after three (3)
days from the date that the notice or approval is mailed with delivery confirmation to the current address
on record with each Party. The parties shall notify each other of any change to their addresses.
7. This Declaration of Covenant is intended to promote the efficient and effective management of
surface water drainage on the Property, and it shall inure to the benefit of all the citizens of the City of
Renton and its successors and assigns. This Declaration of Covenant shall run with the land and be
binding upon Grantor(s), and Grantor's(s') successors in interest and assigns.
8. This Declaration of Covenant may be terminated by execution of a written agreement by the
Owners and the City of Renton that is recorded by King County in its real property records.
IN WITNESS WHEREOF, this Declaration of Covenant for the Maintenance and Inspection of
rlow Control BMPs is executed this __ day of _________ , 20
GRANTOR, owner of the Property
GRANTOR, owner of the Property
ST A TE OF WASHINGTON )
COUNTY OF KING )ss.
On this day personally appeared before me:
____________________ ,tome known to be the individual(s) described in
and who executed the within and foregoing instrument and acknowledged that they signed the same as
their free and voluntary act and deed, for the uses and purposes therein stated.
Given under my hand and official seal this __ day of _________ , 20 __
Printed name
Notary Public in and for the State of Washington,
residing at
My appointment expires __________ _
•
FULL LEGAL DESCRIPTION:
THAT PORTION OF TRACT 244 INC D HILLMAN'S LAKE WASHINGTON GARDEN OF EDEN ADDITION TO
SEATILE DIVISION NO 4, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 11 OF PLATS,
PAGE 82, IN KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS
BEGINNING AT A POINT ON THE WEST BOUNDARY LINE OF SAID TRACT, 301 FEET SOUTH OF THE
NORTHWEST CORN ER OF SAID TRACT;
TH ENCE SOUTH 64 FEET;
THENCE EAST 252.3 FEET, MORE OR LESS, TO THE EAST BOUNDARY LINE OF SAID TRACT;
THENCE NORTH, ALONG SAID EAST BOUNDARY LINE, 64 FEET; THENCE WEST 252.3 FEET, MORE OR
LESS, TO POINT OF BEGINNING;
(BEING THE NORTH 365 FEET OF SAID TRACT 244, EXCEPT THE NORTH 301 FEET THEREOF).
I
.;. l ,
'·\./
! ;
I cl ,z'-
i~
:ij'z aw -w
~,& •jw
8 "' " «
',-1·
I
' lg
,:::;
•
Exhibit A: Flow Control BMP Site Plan
1,/·
~---, !-:.-:-::_-_.,...._-:-~~--._._-:; ~;:: ':------------~~=~,-=-~ ;~=---.,: °'.:·~ ~--c _::; ~ _---=-_:: ~ -_:: =--=-~ ---C 1
: I I , ; lii I I \ '. I I I I I = :I I I i I r-
1 I I :: I I ""--' I ,,12,
.·: ' . I 'I I I I 'i' ·J;j I I i'· I i I 1!
; :i, I I ~ ', :i I [: I I 1~ . iii I j_',_.J __________________ ; 1 f : }
/ ~I ~-~1 ' I
'i
·-.. -.-·;;;:z;q,_L_~~ ~;-;l":~;~'c"~"~ --{~ ~=--c-=-~::--=-~-(_j
80' x 5' x 2 Deep gravel infiltration trench
MAINTENANCE INSTRUCTIONS FOR FULL INFILTRATION
Your property contains an on-site BMP (best management practice) called "full infiltration," which
was installed to mitigate the storm water quantity and quality impacts of some or all of the impervious
surfaces on your property.
Full infiltration is a method of soaking runoff from impervious area (such as paved areas and roofs)
into the ground. If properly installed and maintained per Appendix A of the City ofRenton's Surface
Water Design Manual, full infiltration can manage runoff so that a majority of precipitation events are
absorbed. Infiltration devices, such as gravel filled trenches, drywells, and ground surface depressions,
facilitate this process by putting runoff in direct contact with the soil and holding the runoff long
enough to soak most of it into the ground. To be successful, the soil condition around the infiltration
device must be reliably able to soak water into the ground for a reasonable number of years.
Infiltration Devices
The infiltration devices used on your property include the following as indicated on the site
plan (CHECK Tl IE BOX(ES) THAT APPLY):
l&lgravel filled trenches, Ddrywells, Dground surface depressions.
MAINTENANCE RESTRICTIONS
The size, placement, and composition of these devices as depicted by the site plan and design details
must be maintained and may not be changed without written approval from the City of Renton or
through a future development permit from the City of Renton.
INSPECTION FREQUENCY AND MAINTENANCE GUIDELINES
• Jnfiltration devices must be inspected annually and after major storm events to identify and
repair any physical defects.
• Maintenance and operation of the system should focus on ensuring the system's viability by
preventing sediment-laden flows from entering the device. Excessive sedimentation will result
in a plugged or non-functioning facility.
• If the infiltration device has a catch basin, sediment accumulation must be removed on a yearly
basis or more frequently if necessary.
• Prolonged ponding around or atop a device may indicate a plugged facility. If the device
becomes plugged, it must be replaced.
• Keeping the areas that drain to infiltration devices well swept and clean will enhance the
longevity of these devices.
• For roofs, frequent cleaning of gutters will reduce sediment loads to these devices.
~1'~.
tlCUSE I,, ,
ROOFD0\o\'f.5"0LIT
OVERFLOW
SPL'.S•I BLOCK
TYPICAL FULL INFILTRATION APPLICATIONS
.r:~&.~~~EOR6" ,-\CB SUMPw/SOLID LID _ f
/ PERFORATED 11 I "" ~-,~ , =====., ;r=-,
<::::::::::--Y
INFILTRATION TRENCH
~LAN VIEW
NTS
ROOF DRAIN
TRENCH SETBACK FROM
BUILDING AS REQUIRED
15' MIN
ROOF DRAIN
SECTION VIEW
NTS
TABLE. SEE SECTION C.22 2
"ARK CF~TER CF HOLE
V~TH l"CAl'FEQP,/C
OR OTHER MEANS
FLUSH WITH.SUHCACC
_l
I , MIN
FINE MESH
SCREEN
OVERFLOW
SPLASH BLOCK
11
]
r, _j_l II'~-I 1'MIN
~1'ilN. j
-I SETBACK
-----j FROM
llUILOING
5'MIN
CB SUMP w/SOLID LIO
COMPACTED BACKFILL
FILTER FABRIC
4· RIGID OR 6" FLEXIE!LE
PERFORATED PIPE
tl"-i" WASHED ROCK
SECTION A
NT--g--
'.(~))">;;>;:'%:~~');
314"T01-1/2"~
WASHED DRAIN ':':/_'9
ROCK ':'.--~
--~
FROM ROOF
GRASS
1S'" MIN
_ __t 15' MIN. AS
\,
t
ee= i\
~ ... i~ ~~~: --' ~ ~;it
HNE, ME&H SC SEEN
CATC~ BASIN S1DE5 OF HCLE
CYARDnRA"l m~~~£fA~~~6
IS MIN _AS REOUlnE~ SE~SECTION C;: Z 3
, , I
.j,_ ~' "C, ~
' -' " 4a INCi! OIAl,IE:HR VARIE:S
'HOLEFlLLfr.....,-H 1
1," 3 WASHED
DRAIN ROCK
MIN. 1' AflOVLSVISONAL
HIGH GROUNtlWATER T/Ull.E
SE£SECTIONC112
~:i~~~~~~GH i
GROUNDWATER
TABLE, SEE
SECTION C 2.2 2_l__
~1----;:;~l-~-~DJ
X_"_S_Ei9JION
NTS
;
·-_J_
MIN 1" ABOVE I '
SEASONAL HIGH I 2· MIN i
;:~L~~~~:TER ~---i
SECTION C.2.2.2 X-SECTION
NTS
NOTE:
SEEC223FOR
TRENCH LENGTHS,
TRENCH SPACING AND
SITE LIMITATIONS
-Aberdeen Ave Subdivision 16037.20
Technical Information Report
December 15, 2016
Section X, Page 1
TIR Section X -Operation and Maintenance Manual
TIR Section X Summary:
Narrative
Maintenance instructions for the proposed flow control BMP is included in the Declaration of Covenant
found in Section IX with a proposed Flow Control BMP site plan. Please note that the site plan is
generated during the design phase and may not reflect all changes made in permitting and construction.
CG Engineering may be contacted for an updated copy of this map once the as-built drawings are
completed for the site.
The project contractor will be responsible for passing along the information in this maintenance manual
to the owner. Upon request by the City, it shall be made available for their inspection.
Facilities shall be inspected for defects. The frequency of this should occur annually. Most maintenance
tasks are generally reactionary to a defect being found, rather than a matter of constant upkeep. It is
generally expected that few to none of these defects will be present upon the yearly inspection of each
facility. Unless otherwise noted on the facility sheets the maintenance tasks should be performed on an
"as needed" basis: (a) when the described defect is visible to whomever performs the yearly inspection,
or (b) should any defect become apparent between inspections.
C5
ENGINEERING
250 4th Avenue S0uth1 Suite 200
Edmonds, WA 98020
ph. 425.778.8500 I 1. 425.778.5536
www.cgengineering.com