FILE TITLE SPEGIFII. PEPMIT SP- 3a1 79
TO FILL GLADE ; OS +- N• E. m ST.
THE AUSrIN CAMPANY �Fo� MALCnLM LYIE�
April 13, 1979
OFFICE OF THE LAND USE HEARING EXAMINER
CITY OF RENTON
REPORT AND RECOMMENDATION.
APPLICANT: Austin Company (for J. Malcolm Lyle) FILE NO. SP-321-79
LOCATION: On the north side of N.E. 44th Street east of FAI-405 and west
of Lincoln Avenue N.E. •
"P SUMMARY OF REQUEST: Applicant seeks approval of. a& special permit for fill and grade
of.approximately +25,000 cubic yards on a four-acre site along
N.E. 44th Street east of FAI-405 for possible future development
of a motel complex.
SUMMARY OF ACTION: Planning Department Recommendation: Approval with conditions.
Hearing Examiner Decision: Approval with conditions. .
PLANNING DEPARTMENT The Planning Department preliminary report was received by the
REPORT: Examiner on April 5, 1979.
PUBLIC HEARING: After reviewing the Planning Department report, examining
available information on file with the application, and field
checking the property and surrounding area, the Examiner
conducted a public hearing on the subject as follows:
•
The hearing was opened on April 10, 1979 at 9:00 a.m. in the Council Chambers of the
Renton Municipal Building.
•
Parties wishing to testify were affirmed by the Examiner. •
It was reported that the Hearing Examiner and the applicant had received and reviewed the
Planning Department report, and the report was entered into the record as Exhibit #1.
Steve Munson, Planning Department, reviewed Exhibit #1, and entered the following additional
exhibit into the record: • •
Exhibit #2: Site Development Plan
•
Mr. David Clemens, Associate Planner, corrected line three of Section L.4 of Exhibit #1
• to read ". . .bottom being one foot below" in lieu of ". . .bottom being one inch below" as
denoted in the report.
•
The Examiner asked the applicant if he concurred in Exhibit #1. Responding was:
Paul Kosteniuk
Austin Company
• 800 S.W. 16th Street
Renton, WA 98055
Mr. Kosteniuk indicated concurrence in the. recommendations contained within the report.
The Examiner then requested testimony in support or opposition to the' request. There was
no response. He then inquired if the proposed landfill operation conforms to requirements
contained within the Mining, Excavation and Grading Ordinance. Mr. Munson indicated that
conformance is indicated.
The Examiner requested further comments. Since there were none, the hearing on File No.
SP-321-79 was closed by the Examiner at 10:07 a.m.
FINDINGS, CONCLUSIONS & RECOMMENDATIONS: Having reviewed the record in this matter, the
• Examiner now makes and enters the• following:
FINDINGS:
•
1. The request is for approval of a special permit for landfill and grading of 25,000
cubic yards on four acres of B-1 zoned property in preparation for a potential motel
complex.
•
•
2. The Planning Department report accurately sets .forth the issues, applicable policies
• and provisions, findings of fact; and departmental recommendations in this matter, is
'uncontested, and is hereby attached as Exhibit #1 and incorporated in this report by
reference as set forth in full therein. ' '
•
SP-321-79 Page Two
3. Pursuant to the City of Renton's Environmental Ordinance and the State Environmental
Policy Act of 1971, as amended by R.C.W. 43.21.C. , a Declaration of Non-Significance
has been issued for the subject proposal by Gordon Y. Ericksen, responsible official.
•
4. Plans for the proposal have been reviewed by all city departments affected by the
impact of this development and no adverse comment was expressed.
5. There was no opposition to the proposal expressed.
6. All existing utilities are available and in close proximity.
7. The proposal is compatible with the requirements of Chapter 23 (Mining, Excavation
and Grading) of Title IV, Ordinance No. 1628, Code of General Ordinances.
8. According to the Environmental Checklist contained in the file of record, the landfill
operation will encompass approximately four months. Upon completion of grading of
the landfill, the area will be hydroseeded (Exhibit #2) .
9. The storm drainage ane erosion control methods to be used have been reviewed by the
Public Works Department and approved (Exhibit #1) .
•
10. The proposal must conform to Section 4-2312 (Work in Progress) .
11. Per Sectibn, 4-2303.2.0 the final plan for development on the landfill must be approved
by the Examiner pursuant to a public hearing.
CONCLUSIONS:
•
1. The landfill and grading operation conforms to the Comprehensive Plan and does not
appear to ". ...be an unreasonable detriment to the surrounding area." (Section
4-2303.2.B) .
2. The annual license from the Planning and Public Works Departments (Sections 4-2307.2.B. ,
4-2307.4. , 4-2310 and 4-2309) that is required is sufficient to guarantee compliance
with Chapter 23 and the Examiner's decision.
•
3. Access to the site should be reviewed by the Public Works Department to insure adequate
traffic safety on N.E. 44th Street. , 110th Avenue S.E. and N.E. 43rd Place. Of
particular concern is the curved configuration of N.E. 44th Street. Points of access
should be approved by these departments.
4. Since methods of dust and mud control were not proposed or specified, these mitigating
method's, must be approved by the Public Works Department prior to the beginning of the
operation.
5. Hydroseeding and other fill stabilization measures must be approved by the Planning
Department. Their consideration should include existing vegetation that might assist
in this stabilization.
DECISION:
•
Approval of Exhibit #2 subject to:
1. Approval of access point(s) by the Public Works Department.
2. Approval of dust and mud control measures by the Public Works Department.
• 3. Approval of hydroseeding and fill stabilization methods. by the Planning Department.
4. Compliance with these conditions prior to beginning the landfill operation.
5. Compliance with all other applicable provisions of Chapter 23 and other regulations
and ordinances of the City of Renton.
ORDERED THIS 13th day of April, 1979.
•
414.! 111111011° •
L. •ick Beeler
Land Use Hearing Examiner
TRANSMITTED THIS 13th day of April, 1979 by Affidavit of Mailing to the parties
of record:
• George Fawcett, 4008 Meadow Avenue N. , Renton, WA 98055
Paul Kosteniuk, Austin Company, 800 S.W. 16th 'St. , Renton, WA '
98055
SP-321-79 Page Three
TRANSMITTED THIS 13th day of 'April, 1979 to the following:
•
Mayor Charles J. Delaurenti
Councilman Richard M. Stredicke
Warren C. Gonnason, Public'Works Director
• Gordon Y. Ericksen, Planning Director
Ron Nelson, Building Division
Lawrence J. Warren, City Attorney
Pursuant to Title IV, Section 3015 of the City's Code, request for reconsideration, must
be filed in writing on or before April 23, 1979. Any aggrieved person feeling that the
decision of the Examiner is based on erroneous procedure, errors of law or fact, errOr
in judgment, or the discovery of new evidence which could not be reasonably available at
the prior hearing may make a written request for review by. the Examiner within fourteen
• (14) days from .the date of the Examiner's decision. This request shall set forth the
specific errors relied upon by such appellant, and the Examiner may, after review of the
record, take further action as he deems proper.
., An appeal to the City Council is governed by Title IV, Section 3016, which requires that
such appeal be filed with the City Clerk accompanying a filing fee of $25.00 and meeting
• other specified requirements. Copies of this ordinance are available for inspection in
the Finance Department, first floor of City Hall, or same may be purchased at cost in
said department.
OF R4,4
A
db
THE CITY OF .RENTON
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH. 98055
osilL
m CHARLES J. DELAURENTI, MAYOR • LAND USE HEARING EXAMINER
.3 `O L. RICK BEELER . 235-2593
094rED SEPZ°�P
April 30, 1979
Mr. Paul Kosteniuk
Austin Company
800 S.W. 16th Street
Renton, WA 98055
RE: File No. SP-321-79; Austin Company (for J. Malcolm Lyle) .
Dear Mr. Kosteniuk:
This is to notify you that the above referenced request, which was
approved subject to conditions as noted on the Examiner's report of -
April 13, 1979, has not been appealed within the time period
established by ordinance. Therefore, this application is considered
final and is being submitted to the City Clerk effective this date
for permanent filing.
Sincerely, _
L. Rick Beeler
Hearing Examiner •
cc: Planning Department
City Clerk
. Gm
AFFIDAVIT OF SERVICE BY MAILING
State of Washington)
County of King )
Marilyn J. Petersen , being first duly sworn, upon
oath disposes and states:
That on the 13th day of April 19 79 affiant
deposited in the mails of the United States a sealed envelope
containing a decision or recommendation with postage prepaid,
addressed to the parties of record in the below-entitled
application or petition.
Subscribed and sworn this /.3—day of
•
19 7q .
dJ � -J
Notary Public in and for- the- State
of Washington, residing at Renton'
Application, Petition or Case: Austin Company, SP-321-79
(The minutes contain a List 06 the panties necond)
_ RECEIVED
CITY OF RENTON
HEARING EXAMINER
PLANNING DEPARTMENT Fll l; I 01979
PRELIMINARY REPORT TO THE HEARING EXAMINEM PM
PUBLIC HEARING 71819,!Oo11,1211o2i3,415t6
APRIL 10 , 1979
APPLICANT : AUSTIN COMPANY ( FOR J . MALCOLM LYLE)
FILE NUMBER : SP-321-79 EXHIBIT NO.______------.
A. SUMMARY AND PURPOSE OF REQUEST : ITEM NO. , 60- 11
The applicant seeks approval of a special permit for fill and grade
of approximately ±25 ,000 cubic yards on a four-acre site along N . E .
44th Street east of FAI-405 for possible future development of a
motel complex. ( Site development map attached. )
B . GENERAL INFORMATION :
1 . Owner of Record: FOSTER RADFORD
2 . Applicant : AUSTIN COMPANY ( FOR J . MALCOLM
LYLE)
3. Location : On the north side of N . E . 44th
( Vicinity Map Attached) Street east of FAI-405 and west
of Lincoln Ave. N . E .
4 . Legal Description : A detailed legal description is
available on file in the Renton
Planning Department.
5 . Size of Property : ±4 acres .
6 . Access : Via N . E'. 44th Street .
7 . Existing Zoning: B-1 , Business Use .
8 . Existing Zoning in the Area : B- 1 , Business District ; G-9600 ,
Residential Single Family.
County property to the east :
Tract 182 - Community
Business
Tract 186 - RM- 1800
Tract 187 - RM- 1800
9 . Comprehensive Land Use Plan : Commercial .
10 . Notification : The applicant was notified in
writing of the hearing date .
• Notice was properly, published
in the Record-Chronicle on
March 30 , 1979 , and posted in
three places on or near the site
as required by City ordinance
on March 29 , 1979 .
C. HISTORY/BACKGROUND:
The subject site was annexed into the City by Ordinance 1823 dated
April 21 , 1960 .
D. PHYSICAL BACKGROUND :
1 . Topography : The site rises from west to east. at a grade
varying from 4-5 . 5% . Some portions in the center of the site
are below street grade.
2 . Soils : Norma Sandy Loam ( No) . Permeability is moderately
rapid . The seasonal water table is at or near the surface.
Runoff is slow and the erosion hazard is slight . This soil
is used mostly for pasture . Drained areas are used for row
' PLANNING DEPARTMENT
PRELIMINARY REPORT TO HEARING EXAMINER
PUBLIC HEARING: AUSTIN COMPANY ( FOR J . MALCOLM LYLE )
APRIL 10 , 1979
PAGE TWO
crops . Kitsap silt loam, 8- 15% slopes ( KpC) . Runoff is
medium, and the erosion hazard is moderate to severe .
This soil is used for timber and pasture. Ragnar-Indianola
association , sloping ( RdC) . Permeability is moderately
rapid to rapid. Runoff is slow to medium, and the erosion
hazard is moderate to severe . These soils are used for
timber. ' Bellingham silt loam ( Bh) . Permeability is slow .
The seasonal water table is near the surface during the
rainey season . Runoff is slow, and the hazard of erosion
is slight . This soil is used mostly for pasture . A few
areas are used for row crops .
3. Vegetation : Medium growth deciduous trees are found in the
westerly one-third of the site with the remainder consisting
of low to medium-growth shrubs and some areas which have
been graded .
4. Wildlife : Existing vegetation may provide suitable habitat
for birds and small mammals .
5. Water : Standing water was observed in the central and west
central portion of the subject site .
6 . Land Use : The site itself and vicinity east of the freeway is '
presently undeveloped .
E . NEIGHBORHOOD CHARACTERISTICS :
The area east of FAI-405 is largely undeveloped with the existing
uses composed principally of single-family dwellings . To the
south is a printing shop and to the west of the freeway , the
land uses are a mixture of industrial , commercial , and some multi -
ple family uses .
F. PUBLIC SERVICES :
1 . Water and Sewer: Six and eight-inch water mains run east-west
on N. E. 44th Street along the southern boundary of the subject
site . A 12 -inch main extends north-south on Lincoln Ave . N . E .
on the easterly border, and an 18-inch sewer main is located
along the same street.
2 . Fire Protection : Provided by the Renton Fire Department as per
ordinance requirements .
3. Transit : Metro Transit Route #240 operates along Lake Washing-
ton Boulevard North within 200 feet to the north of the subject
site .
4 . Schools : Not applicable .
5. Recreation : Not 'applicable.
G. APPLICABLE SECTIONS OF THE ZONING CODE :
1 . Section 4-711 , B- 1 , Business District.
2 . Chapter 23, Mining , Excavation , and Grading.
H . APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN
OR OTHER CITY DOCUMENTS :
1 . Comprehensive Plan , Land Use Reports , 1965 , Objectives ,
pages 17-18.
I . IMPACT ON THE NATURAL OR HUMAN ENVIRONMENT :
T.— Natural Systems : Filling of the site will disturb soil and
vegetation , increase storm water runoff, and increase traffic
I _
PLANNING DEPARTMENT
PRELIMINARY REPORT TO HEARING EXAMINER
PUBLIC HEARING: AUSTIN COMPANY ( FOR J . MALCOLM LYLE)
APRIL 10, 1979
PAGE THREE
and noise levels in the area . However, through proper develop-
ment controls and procedures , these impacts can be mitigated .
2 . Population/Employment : The fill and grade permit will have no
direct impact on employment. However, future commercial use
of the filled property will have to be addressed upon specific
development .
3. Schools : Not applicable .
4 . Social : Not applicable .
5 . Traffic : Assuming 25 cubic yards per truckload , 25 ,000 yards
would require 1 ,000 truckloads , or 2 ,000 total truck trips .
J . ENVIRONMENTAL ASSESSMENT/THRESHOLD DETERMINATION :
Pursuant to the City of Renton ' s Environmental Ordinance and the
State Environmental Policy Act of 1971 , as amended , RCW 43-21C, a
declaration of non-significance has been issued for the subject
proposal . This negative declaration is further based on proper
development procedures per City ordinances and the provision of
suitable landscape areas to help reduce the resulting loss in
vegetation by site development.
K. AGENCIES/ DEPARTMENTS CONTACTED:
1 . City of Renton Building Division
2 . City of Renton Engineering Division
3. City of Renton Traffic Engineering Division
4 . City of Renton Utilities Division
5 . City of Renton Fire Department
6 . City of Renton Police Department
L . PLANNING DEPARTMENT ANALYSIS :
1 . The subject site is presently zoned B-1 , Business Use-, which
will permit future commercial development on the site . The
applicant ' s general proposal for a motel would be consistent
with the comprehensive planning and zoning for the area .
2 . No specific development plan for the subject property has been
submitted at this time . However, the applicant ' s proposed
future development will be subject to City of Renton require-
ments including the Hearing Examiner ' s site plan approval per
Section 4-2303 . 2C of the Mining , Excavation , and Grading
Ordinance.
3. The proposed ±25 ,000 cubic yards of fill will be placed on the
site to establish an elevation of 36 feet. The existing eleva-
tions range from a low point of ±28 feet in the south central
portion to a high point of ±50 feet near the southeast corner.
4. The Engineering Division of the Public Works Department notes
that the temporary sedimentation pond is required to have a
150 cubic feet per acre capacity with the bottom being 1" below
the flow line of the outfall . Straw bales should be placed
against the outfall pipes to reduce downstream siltation .
5 . The Fire Department advises that for any future development ,
the required access and hydrants or any other fire protection
facilities will have to be installed prior to and during con-
struction . These facilities will be required to meet fire
flow and uniform fire code requirements for occupancy type.
6 . The Police Department indicates that the contractor will have
to keep the adjacent roadways clear and clean of debris , dirt ,
and rocks .
PLANNING DEPARTMENT
PRELIMINARY REPORT TO HEARING EXAMINER
PUBLIC HEARING: AUSTIN COMPANY ( FOR J . MALCOLM LYLE)
APRIL 10 , 1979
PAGE FOUR
7 . Suitable utilities are available to the subject site.
Standard hook-up fees for water and sewer will apply. See
other comments .
8. Subject to compliance with all pertinent sections of Section
_4-2300 , and specifically the requirements of 4-2312 , this
permit should satisfactorily meet the objectives of the
Comprehensive Plan to encourage the "highest and best use
of property" while "protecting property values within the
community for the benefit of residents and property owners , "
Land Use Report , 1965 - Objectives .
9 . The Jones Avenue sewer crosses the site . The Engineering
Division advises that the easement for the sewer shall not
be used as a haul road . Further, caution must be taken
when tying the proposed fill into the existing fill over
the sewer line.
10 . Additional comments of other departments are attached for
consideration .
M. DEPARTMENTAL RECOMMENDATIONS :
Based upon the foregoing analysis , recommend approval subject to
the following conditions :
1 . At all times during the life of this permit , all public
roadways adjacent to and providing access to this site shall
be maintained in a clean and clear condition .
2 . Compliance with the temporary sedimentation and drainage
requirements of the Public Works Department.
3. Future development of the property shall be reviewed and
approved by. the Hearing Examiner pursuant to Section
4-2303-2C.
4. The applicant shall conform to Engineering Division require-
ments to protect the existing sewer line.
• \\---=- ' \
-, - �� \ t /I . I
' '.\\I' \\', J/I)//('\1 1 ' I
GO f / �, - _
1•1 ,U� r , • 162el ri
•
I I
tit
( v �i .S! ..i' .roe ! i!i i!O
f L 6
. , • . i .
.
. L ® A7 I
/ , �' 'j, •i' •I �.� y2 aL I!b '!1 1
h 1�f i` I\4e a
//' I _ 0 a
;
/ . .
/ /„, � 3 's5 o
LaSt'i, I
e !it !
w
/ . /t i / 1
j [ t/f / Ie I ,,,7
/A / mya r
"
d , L! i
r / �I/ tt Ir'I , '57 I e!2 fff
I
_,____It
. , T i: c "
1 , 0
, ec
.. .
/ r ii
; tp.t.,..tr. ,,iii, . IL./1) . H off/'/ / \ ' .1 4. . II'
z :i :
zJ11
1Z !
l\\ R / \ \I i�t 4 5 L b 5
\ id
i . X i 7 —J e i
Z-
/ /'.off `\'N, -_ I 1i 2 .Y\--ei_--`.,•T __ 111
/ / / 6A ,. iN' _ o! li - 4` —.� 2\ I .
ti t - 3
N ---_
J / ' i t ez 9. .-.-. . _••L za- I I z B q I o L • a ` •�' "� � `i
*' / l 80"
yp� Nq 9 ;` /:• - t.
z,,7 y E I 95 x--_ I .. w» x,r"u:M�',9T _ -1-- —
_. �.� _� �
.'I! it 5 r1,1.i-•r'.,1. rt.I -i..L1..),�I -• 1 1 \........__•__-. ....�7 ,._... .. _F._. ...,. _. „I.,� .... ._.,�
. f
THE AUSTIN COMPANY ( FOR J . MALCOLM 'LYLE) • i
'
I
a SP-321-79
1 1
i S
APPLICANT THE AUSTIN COMPANY (FOR J. MALCOI M TOTAL AREA ±4 acres R
s' LYLE) t
1,• PRINCIPAL ACCESS Via N . E . 44th Street
i
EXISTING ZONING B-_] , BusinPSc lice
EXISTING USE Undeveloped
I PROPOSED USE Motel Complex 1
COMPREHENSIVE LAND USE PLAN Commercial 1
1
1 COMMENTS -
i
1
t :• -�` '
•' r,
__,
•
. �+ ExID7C4
-. /NV 3137 s//Kf75
` . -r. fxY37.?e'c MP
•
?"d,< �� - wr 7 4 a Icy+ '+` 'eeer ® 41 �-
' , �` . r :•, >I l—ram _ — : i` rs. ,' ' --
y �^ - r� � � //i - �.�. .�.„� '� - � ��- is
•
'.• Nif . 1 _
,, ,, . .,.. ,
. ,,5,. .„ Art .N
•
.-V (Irlici. N.- '''. N'''
, J :;yr
_ „,-.,,,..,:.
.-- n_ A ,
•-...- "" s. ,so I o\\‘' Z ( \ • — -- 2 1 ; . --••••,N\\ ',-,..: v-- ,
•
. .11,07 ,--,4,,-.,.,, , ._!..-6,,,.,, . x .. ... . . .„. ..... 1 , ....) '-`..'f'" 4
•
•
.1-4_ -44-111
-4., fit. - - ,•
a,.r, l•�e. ! .
•11: ...
Artt
I '�- "j1r'/•'" x•r•- e;'c,I"^v+t +,3, :e-•c •, {,.''Yr; "s'4 - "R ` ,� s - i _
' a .ur a 5. - # �'
•
a,Y T _T. -,+.rn r.^..,iJ'.Rs -•'--„ �.. .R-r"�' vt� L �; �:1• • -'� _�. _ , ...j +' ..�Y ,---, V•1.Jse
4113RD PL•
.vow R ,s...57. C'� {I eM UCI( 1
tir 3C 9 E[EV 365Z
Exi37 24-cwP;
'Hy 338
ROUTING SCHEDULE FOR APPLICATION
TO : ® Finance Department
8 Fire Department
Library Department
OPark Department
® Police Department
Public Works Department
® Building Div .
® Engineering Div . (Please verify legal description )
0 Traffic Engineering Div .
;I Utilities Engineering Div .
FROM: Planning Department , (signed by responsible official or
his 7ee) p__J DATE : 9 / )9
PLE SE REVIEW THIS APPLICATION FOR :
APPLICANT : ddee* 694 l' .
LOCATION : , r , 1,16' _,t: r,
APPLICATION(S) : iV A4/0/ 6hek : ,/P:— ,/, ,,
IN ORDER TO BE INCLUDED IN THE REPORT TO THE HEARING EX N
RETURN ANY COMMENTS TO THE PLANNING. DEPARTMENT BY :
REVIEW BY OTHER CITY DEPARTMENTS :
Department : / . //-I=/=i G= lv(-)/lV 4: Eic' / Aic,
flop Approved U Not Approved
Comments or conditions : ,
16/ ‘,/ 3/07
Signature of Director or Authorize Representative Date
ROUTING SCHEDULE FOR APPLICATION
TO: 0 Finance Department ,
8 Fire Department
Library Department
0 Park Department
0Police Department
"
Public Works Department
® ,,@61lding Div.
Engineering Div. (Please verify legal description )
Traffic Engineering Div.
C Utilities Engineering Div.
FROM: Planning Department , (signed by responsible official or
his d signee)
04/1) e &tf# DATE : OA?
PLE SE REVIEW THIS A�P3LICATION FOR :
APPLICANT : . 9' /J' "*/
eki-i,LOCATION : � ,
APPLICATION(S) : AY �' c� : �"' /a' 01
d
IN ORDER TO BE INCLUDED IN THE REPORT TO THE HEARING EX N
RETURN ANY COMMENTS TO THE PLANNING DEPARTMENT BY :
REVIEW BY OTHER CITY DEPARTMENTS :
Department :
co Approved L N t Approve"
Comments or conditions :
I
4 i9kg ? r // tive Date
Signature of Di rector\or � Authorized Representa�
ROUTING SCHEDULE FOR APPLICATION
TO: ® Finance Department
Fire Department
Library Department
0 Park Department
® Police Department
0 Public 1s Department
Building Div.
0 `Engineering Div . (Please verify legal description )
8 Traffic Engineering Div .
Utilities Engineering Div. '
FROM: Planning Department , (signed by responsible official or
his 7ee) p e &tf DATE : 009
PLE SE REVIEW THIS APPLICATION FOR :
APPLICANT : 4,. 4/&'* tv/I‘
e ..z,- Af,
APPLICATION(S) : 1422 (Wade : 61p- i/--1,
IN ORDER TO BE INCLUDED IN THE REPORT TO THE HEARING EX
RETURN ANY COMMENTS TO THE PLANNING DEPARTMENT BY : -
REVIEW BY OTHER CITY DEPARTMENTS :
Department: Z-- -
W Approved LJ Not Approved ,
o ni pie nts or conditions :
•
•
(7 , /
../-- ,-;-';,--- C---- L_ de _ :::70__________ "-.7.- 7(-
Signature of Director or Authdrize,d Representative Date
ROUTING SCHEDULE FOR APPLICATION
TO : ®,Finance Department
Fire Department
Library Department
k� ® Park Department
` Police Department
® Public Works Department
J Building Div .
OEngineering Div . (Please verify legal description)
O Traffic Engineering Div .
4) Utilities Engineering Div .
FROM: Planning Department , (signed by responsible official or
his 7nee ) e‘&ttii, DATE : ,440 /9
PLE SE REVIEW THIS APPLICATION FOR :
APPLICANT : // h.Q/: 4lee*
LOCATION : ' . e � �
APPLICATIONS) : 47 Qire iveClC® . ✓/ v/e1- ?? •
IN ORDER TO BE INCLUDED IN THE REPORT TO THE HEARING EX N
RETURN ANY COMMENTS TO THE PLANNING DEPARTMENT BY :-
•
REVIEW BY OTHER CITY DEPARTMENTS :
-- - Department : 7'i/-'
Q"Approved DIEN Not Approved P P Mr1s /t'/��"'
Comments or conditions : , /m y
ACc�-Ss /t,vi f/i?G !{yi,2/'/M.'S d/` ,4 c y 0Ti<7-c
f&G J-"--" LCc P1/c f nA-7D �/ie/(/G. j3,'•r/2-47r/✓G' C 1t.-S��vr� �ci� Afi4
Gr�vrr �yt �i.QG C�n /- P4(//37-7-ram 73 /i ecc u//f-,vc:>•. ji�G�
Signature of Director or Authori ed epresentative Date
REVIEW BY OTHER CITY DEPARTMENTS :
Department : t,tritA ' Vcv (
cm Approved C=1 Not Approved •
Comments or conditions :
rj-0;:;G-( O tr►c 'r'IN(o "�R� WSJ 2L&N1,2C0"'+l•' i•S, ---- 026-Si:+keu.`�
!co
I¢ / Ste: 1=1- Fu;il
rJ,L.
3/2L 7>
Signature of Director or Auth ri z d Representative Da -e
.
ROUTING FOR REVIEW OF ENVIRONMENTAL CHECKLIST FORMS
TO: ® Finance Department
III Fire Department
Library Department
Park Department
Police Department
C' Public Works Department
8/Building Div .
Engineering Div .
® Traffic Engineering Div .
0 Utilities Engineering Div .
FROM: Planning Department , (signed by responsible official or his
designee)0*e g u. , tigf/ 4s91
; Application No . : AP' x/.- ,9
SUBJECT : Review of ECF- ¢��� 0
Action Name : 47'WI Gd;447
6-
4f .. -✓.
Please revi
ew the attached. Review requested by (date) : 1, W 09
Note : Responses to be written in ink .
REVIEW BY OTHER CITY DEPARTMENTS :
Department : C/v( ,..e —.\
l ! SIGNIFICANT NON SIC IFICANT
Comments :
A,.—.----_—.4 3/ /7Y.
�
Signature of Director or Authorized Represente Date
•
ROUTING SCHEDULE FOR APPLICATION
TO : ® Finance Department
Fire Department
Library Department
® ark Department
Police Department
® Public Works Department
(D)Building Div.
(Ti Engineering Div . (Please verify legal description)
Traffic Engineering Div .
Utilities Engineering Div .
FROM: Planning Department , (signed by responsible official or
his d signee )
DATE : /
PLE SE REVIEW THIS APPLICATION FOR :
APPLICANT : h' (4/ 44de 41947 Z'- rf.
LOCATION : I '
APPLICATION(S) : 4 at 6 O :
IN ORDER TO BE INCLUDED IN THE REPORT TO THE HEARING EX N
RETURN ANY COMMENTS TO THE PLANNING DEPARTMENT. BY :
REVIEW BY OTHER CITY DEPARTMENTS :
Department : POLICE DEPARTMENT
CM Approved =1 Not Approved •
Comments or conditions :
Reviewing the Proposed Fill and Grading Project at NE 44th and 1-405
we see no problem to the police department, except that the Contractor
will have to keep the adjacent roadways clear and clean of debris,
dirt, rocks, etc.
This will be brought to the attention of the contractor at the pre-
construction conference.
•
Signature of Director or Authorized Representative Date
ROUTING FOR REVIEW OF ENVIRONMENTAL CHECKLIST FORMS
TO: O Finance Department
III Fire Department
Library Department
Park Department
Police Department
0 Public tks Department
CD,. Building Div .
Engineering Div .
® Traffic Engineering Div .
0 Utilities Engineering Div .
FROM: Planning Department , ( signed by responsible official or his
designee) ? 64*I /1 0
0,402 „,t
SUBJECT : Review of ECF- 4'/1- 7 ; Application No . : -IP- , - — 2�
,
Action Name :__.1FLorla ('
I : 41 if Z.".,l'i •
- Please review the attached. Review requested by (date ) : -' �
Note : Responses to be written in ink.
REVIEW BY OTHER CITY DEPARTMENTS :
.Department : ( -g c-qm ,
1 ! SIGNIFICANT ,-NON SIGNIFICANT
Comments :
7 _
- /7--7 7,
Signature f Director or Authorized Representative
Date
ROUTING FOR REVIEW OF ENVIRONMENTAL CHECKLIST FORMS
TO: ® Finance Department
Fire Department
Library Department
Park Department
Police Department
® Public Works Department
8 Building Div .
Engineering Div.
Traffic Engineering Div.
O Utilities Engineering Div .
FROM: Planning Department, ( signed by responsible official or his
designee)
OW ,,e 61011gt/ viloi
Review of ECF- 61014f ; Application No . : '2' /— 9
SUBJECT : / $iiAction Name : 4V4a0/
AA 410 4,Za—f(1
Please re
view the attached . Review requested by (date) : I
�
Note : Responses to be written in ink .
REVIEW BY OTHER CITY DEPARTMENTS :
Department : lr,?,-f/< E M' I in ee ILJ
1 ! SIGNIFICANT ('t NON SIGNIFICANT
Comments :
I( -/ - ' .54(1/?c-
Signature of Director or Authorized Representative
Date
ROUTING FOR REVIEW OF ENVIRONMENTAL CHECKLIST FORMS
TO: ® Finance Department
Fire Department
40 Library Department
40 .4-1k Department
ID- Police Department
® Public Works Department
8 Building Div .
Engineering Div .
® Traffic Engineering Div .
0 Utilities Engineering Div .
FROM: Planning Department , (signed by responsible official or his
designee)
Owat le et ' . gt/ ,, ,,lifelf
SUBJECT : Review of ECF- epe- 7, ; Application No . : ' "gif— 79
Action Name : t, a'/O' 6 e :.
_IA -fig ,Z6•''ll,/ ,
Please review the attached. Review requested by (date) : f,f
gk #
Note : Responses to be written in ink .
REVIEW BY OTHER CITY DEPARTMENTS :
Department :
1 1SIGNIFICANT I INON SIGNIFICANT
Comments :
•
Signature of Director or Authorized Representative Date
/-
ROUTING FOR REVIEW OF ENVIRONMENTAL CHECKLIST FORMS
TO: ® Fj,nance Department
40- Fire Department
40 Library Department
01 Park Department
40 Police Department
®( Public Works Department
Building Div .
Engineering D,iv .
® r'affic Engineering Div .
_. Ad Utilities Engineering Div .
FROM: Planning Department , (signed by responsible official or his
designee )
atipe i4;,? ezmitia ,/,,e9i
SUBJECT : Review of ECF- 4017E ; Application No . : „rip.. 1....' 4
Action Name : Aid/40a/ -eire
ee-
1 N //i . Z''''OPP R
Please review the attached . Review requested by (date ) :, ;r' i'
11,
Note : Responses to be written in ,ink .
REVIEW BY OTHER CITY DEPARTMENTS :
Department : �/&=--
I SIGNIFICANT I I NON SIGNIFICANT/14(5'j /c'/C 7 /% l�v4..)_
Comments : eii�6 ..te S ,r. /,s1 ,/u �7 Cai✓S7iC:7sG'z%
/C S (S -c.. /_'� J>c , ! )ZGEt.-2 /0alld2 iv /4„,,, 4,r2/4./' 0C11/642/44
rciit i.c i/fce G i7c't i • rl' G/.v//"--Q(Crl /-.j CS/JU �G Qu./tEMc;.try r l2.
0cG,>(, t/vcy c• /
,
'-(1 : ,i,"--- ---- - '-‘-'-. _ I . g A /77
Signature of-
irector or Authori Representative Date
REVIEW BY OTHER CITY DEPARTMENTS :
Department :
1 ' SIGNIFICANT ' i NON SIGNIFICANT
Comments :
r
Signature of Director or Authorized Representative Date
• PROPOSED/FINAL DECLARATION OF SIGNIFICANCE/I..,..-SIGNIFICANCE
Application No . SP-321-79 ® PROPOSED Declaration
Environmental Checklist No . ECF-439-79 X FINAL Declaration
Description of proposal The applicant seeks approval of a special permit
for fill and grade of approximately ±25,000 cubic yards on a 4-acre site
for future development of a motel complex.
Proponent _ AUSTIN COMPANY ( FOR J . MALCOLM LYLE)
On the north side of N.E. 44th St. east of FAI-405 and
Location of Proposal west of Lincoln Avenue N.E.
Lead Agency CITY OF RENTON PLANNING DEPARTMENT
This proposal has been determined to 0 have ® not have a
significant adverse impact upon the environment . An EIS 0 is
is not required under RCW 43 . 21C . 030 (2 ) (c ) . This decision was
maie after review by the lead agency of a completed environmental
checklist and other information on file with the lead agency .
non
Reasons for declaration of environmental /significance :
This declaration is based on proper development procedures per City
ordinances and the provision of suitable landscape areas to help
reduce the resulting loss in vegetation by site development.
Measures , if any , that could be taken to prevent or mitigate the
environmental impacts to such an extent that the lead agency would
withdraw its declaration of significance and issue a (proposed/final )
declaration of non-significance :
Responsible Offi ial Gnrdnn Y _ Ericksen
/
Ti tl e Plansd ect Date April 3 . 1979
111/1119! .+tk
Signature 4e' [ #r Ar # I� �Q C.S 4ii Ky
City of Renton
f r,' Planning Department
r` 5-76
CITY OF RENTON `,o OF R�
APPLICATION FOR SPECIAL PERMIT v PET4Fo
O
Ig 1979 ,
v
FOR OFFICE USE ONLY 73 ,,~, ''••..,
File No . SP- 3 d/-77 Date Rec' d. �G'
' PAR
Application Fee $ /693. ' e)U Receipt No .
Environmental Review Fee $
APPLICANT TO COMPLETE ITEMS 1 THROUGH 6 :
1 . Name THE AUSTIN COMPANY/ Mppl incialglm Lyle Phone 206-226-8800
Address 800 S.W. 16th Street, Renton, Washington 98055
2 . Property location 1700 Block of N.E. 44th Street.
3. Legal description (attach additional sheet if necessary)
FAI 405 and N.E. 44th Street. The south three acres of Tracts 183
and 184 of C. D. Hillman' s Lake Washington Garden of Eden addition.
Except portions thereof condemned by the State of Washington for
highways by construction order #613780, January 3 , 1964 .
4 . Number of acres or square feet 4 acres Present Zoning B-1
5. What do you propose to develop on this property? Fill and grade
property for future development of hotel complex.
6 . The following information shall be submitted with this application :
A. Site and access plan (include setbacks , Scale
existing structures , easements , and other
factors limiting development) 1" = 10 ' or 20 '
B. Parking, landscaping and screening plan 1" = 10 '
C. Vicinity map (include land use and zoning
on adjacent parcels) 1" = 200 ' to 800 '
D. Building height and area (existing and proposed)
E. A special permit required by the Renton Mining , Excavation and
Grading Ordinance shall submit the information listed in
Section 4-2307 .5 in addition to the above.
7 . LAND USE HEARING EXAMINER'S ACTION:
Date Approved
Date Denied
Date Appealed
Appeal Action
Remarks
Planning Dept.
Cac* Pfri0 /1/ ‘
AFFIDAVIT � 14
(741,
1979
•
tiG D
I , Foster Radford , being duly sword, e that I
am the owner of the property involved in this application and that the
foregoing statements and answers herein contained and the information
herewith submitted are in all respects true and correct to the best of
my knowledge and belief.
Subscribed and sworn before me
this 7th day of March , 19 79 ,
Notary Public in and for the State of
Washington, residing at Seattle
J6s 9
(Name of Notary P lic) (Signature of 0/ner)
84.14 8th Avenue SW, Seattle, WA. /p�o?,3 /41,i4.J 3T
(Address) (Address)
•
•
4e//eu e_ bJ L
(City) (State)
,4$00
(Telephone)
(FOR OFFICE USE ONLY)
CERTIFICATION
This is to certify that the foregoing application has been inspected by me
and has been found to be thorough and complete in every particular and to
conform to the rules and regulations of the Renton Planning Department
governing the filing of such application .
Date. Received , 19 By:
Renton Planning Dept .
2-73
.61 OP
CITY OF RENTON, WASNINGTON G Rl // \2
ENVIRONMENTAL CHECKLIST FORM 17 4 ?? JJ�� p
dg
4949
O�,pARTMcf‘
FOR OFFICE USE ONLY 4
Application No. 3' ?/'??
Environmental Checklist No. / 379
PROPOSED, date: FINAL , date:
Declaration of Significance 0 Declaration of Significance
Declaration of Non-Significance Declaration of Non-Significance
COMMENTS:
•
Introduction The State Environmental Policy Act of 1971, Chapter 43.21C, RCW, requires
all state and local governmental agencies to consider environmental values both for their
own actions and when licensing private proposals. The Act also requires that an EIS be
prepared for all major actions significantly affecting the quality of the environment.
The purpose of this checklist is to help the agencies involved determine whether or not a
proposal is such a major action.
Please answer the following questions as completely as you can with the information
presently available to you. Where explanations of your answers are required, or where
you believe an explanation would be helpful to government decision makers, include your •
explanation in the space provided, or use additional pages if necessary. You should
include references to any reports or studies of which you are aware and which are rele-
vant to the answers you provide. Complete answers to these questions now will help all
agencies involved with your proposal to undertake the required environmental review with-
out unnecessary delay.
'The following questions apply to your total proposal , not just to the license for which
you are currently applying or the proposal for which approval is sought. Your answers
should include the impacts which will be caused by your proposal when it is completed,
even though completion may not occur until sometime in the future. This will allow all
of the agencies which will be involved to complete their environmental review now, with-
out duplicating paperwork in the future.
NOTE : This is a standard form being used by all state and local, agencies in the State
of Washington for various types of proposals. Many of the questions may not apply to
your proposal . If a question does not apply, just answer it "no" and continue on to the
next question.
ENVIRONMENTAL CHECKLIST FORM
I. BACKGROUND
1. Name of Proponent TNT /4i)S1-!!J CO/NP/?N y APPLy1,J Fo/�
2. Address and phone number of Proponent:
A'1 . T. /v/m L COL.M L YLE-
ag
®D S. . /et, s%2EET
R N 7ro SHI/,i2 To, ./ 4 8 o cS
2oG -- 226 - eA60
3. Date Checklist submitted Al/I12/ L'H 1 1 G179
4. Agency requiring Checklist CITY Of' /'J roil , >2L/ANN/n!6 D&'7.
5. Name of proposal , if applicable:
AAJ O 62A 10/N G PERM i r
6. Nature and brief description of the proposal (including but not limited to its
size, general design elements, and other factors that will give an accurate
understanding of its scope and nature) :
rrILL A/J D GiZM®L 4 A-CRE S /rE
-2-
7. Location of proposal (describe the physical setting of the proposal , as well
as the extent of the land area affected by any environmental impacts, including
any other information needed to give an accurate understanding of the environ-
mental setting of the proposal ) :
8. Estimated' date for completion of the proposal :
4 noNi- s ArrE:e /SSL14/►/CL oC O /
9. List of all permits, licenses or government approvals required for the proposal
(federal , state and local--including rezones) :
SPE CiAL Pi lq/'91 r ti'o%{ /)LL u I Q iifJ® G'2 i9hd 6
10. Do you have any plans for future additions , expansion, or further activity
related to or connected with this proposal? If yes , explain:
YES Di /i L oPMly r Lo A1.0176 Ca/1,'L X
11. Do you know of any plans by others which may affect the property covered by
your proposal? If yes, explain:
12. Attach any other application form that has been completed regarding the pro-
posal ; if none. has been completed, but is expected to be filed at some future
date, describe the nature of such application form:
J3 01LD i/d G Pz i2/il/r
II. ENVIRONMENTAL IMPACTS
(Explanations of all "yes" and "maybe" answers are required)
(1) Earth. Will the proposal result in:
(a) Unstable earth conditions or in changes in geologic
substructures?
Y€- MAYBE N
(b) Disruptions, displacements , compaction or over-
covering of the soil?
YES MAYBE NO
(c) Change in topography or ground surface relief
features? X
Y S MAYBE Alm
(d) The destruction, covering or modification of any
unique geologic or physical features?
•
YES MAYBE W
(e) Any increase in wind or water erosion of soils,
either on or off the site? )(
YY Ems- RATETE NO.
(f,) Changes in deposition or erosion of beach sands, or
changes in siltation, deposition or erosion which
may modify the channel of a river or stream or the
bed of the ocean or any bay, inlet or lake?
YES MAYBE AU—
Explanation:
(b) (e) L oMPlacri ,%J 1A)O ov1.11t CaI./ERhJ O/ Tfdl
SOIL %/uJ el-?,4IJ!dE J.J 7`D A.vMy bJE T�
/dDJ /'ILL .
3 r�Ff
(2) Air. Will the proposal result in:
•
(a) Air emissions or deterioration of ambient air '� `•• 119f
quality?
,'y61
�x
YES `%'
(b) The creation of objectionable odors?
• ;i A
(c) Alteration of air movement, moisture or temperatures,
or any' change in climate, either locally or
regionally? X
YEK- Alit' Y B E N O—
Explanation:
(3) Water. Will the proposal result in:
(a) Changes in currents, or the course of direction of
water movements, in either marine or fresh waters? 7C
YES MAYBE NO
(b) Changes in absorption rates ,. drainage patterns, or
the rate and amount of surface water runoff? X
Yt-S MAYBE 0—
(c) Alterations to the course or flow of flood waters?
YES MAYBE NO
(d) Change in the amount of surface water in any water
body? YET— MAYBE 0
(e) Discharge into surface waters , or in any alteration
surface water quality, including but not limited to
temperature, dissolved oxygen or turbidity?
YES MAYBE 0—
(f) Alteration of the direction or rate of flow of
ground waters?
YET— MAYBE NO
(g) Change in the quantity of ground waters, either
through, direct additions or withdrawals , or through
interception of an aquifer by cuts or excavations? X
YES MAYBE NO
(h) Deterioration in ground water quality, either through
direct injection, or through the seepage of leachate,
phosphates, detergents , waterborne virus or bacteria,
or other substances into the ground waters?
YES-- MAYBE h0
(i ) Reduction in the amount of water otherwise available
for public water supplies?
YES MAYBE IN
Explanation:
(4) Flora. Will ,the proposal result in:
(a) Change in the diversity of species, or numbers of any
species of flora (including trees, shrubs, grass , crops ,
microflora and aquatic plants)?' x
YES MAYBE NUi
(b) Reduction of the numbers of any unique, rare or
endangered species of flora? X
Yam' MAYBE Th
(c) Introduction of new species of flora into an area, or
in a barrier to .the normal replenishment of existing .x
species?,
91 MAYBE A07—
(d) Reduction in acreage of any agricultural crop? r- RAM
Explanation:
(a-) bVE12CovE2u L-X/SfJA G S/1Rt)6S AN® 6a lei SCLS
VI r 1/LL
-4- - ,.y
(5) Fauna. Will the proposal result in:
(a) Changes in the diversity of species, or numbers of
any species of fauna (birds, land animals including
• reptiles, fish and shellfish, benthic organisms ,
insects or microfauna)?
YE RATMEN,0
(b) Reduction of the numbers of any unique, rare or
endangered species of fauna?
YES C NO
(c) Introduction of new species of fauna into an area,
or result in a barrier to the migration or movement
of fauna?
Y—ES— WirEir NO
(d) Deterioration to existing fish or wildlife habitat? X
YET MAYBE Nr
Explanation: (d) 7/a&iC er//# Y 2 E So.t1ts W®LDL, e'/i 4j
RRAA/rs cLL.D lit/ CE ETC. TIl!?r vJez.z_ .63E
T SPLfCZD IS y CiLLIA1,6 AJf . Dii•JG
(6) Noise. Will the proposal increase existing noise levels?
YES MAYBE NO
Explanation:
(7) Light _and Glare. Will the proposal produce new light or
glare?
YES MAYBE _
Explanation: '
(8) Land Use. Will the proposal result in the alteration of the
present or planned land use of an area?
Yrs ROTE N
Explanation:
(9) Natural Resources. Will the proposal result in:
(a) Increase in the rate of use of any natural resources?
Yt MAYBE NO
(b) Depletion of any nonrenewable natural resource?
YES MAYBE N
Explanation:
(10) Risk of Upset. Does the proposal involve a risk of an
explosion or the release of hazardous substances (including,
but not limited to, oil , pesticides, chemicals or radiation)
in the event of an accident or upset conditions?
yr MMAYBE N
Explanation:
(11) Population. Will the proposal alter the location, distri-
bution, density, or growth rate of the human population
of an area? Y_ �E W
Explanation:
44^ �^0 01;
-5- b 44pQ �y
r 1c)
(12) Housing. Will the proposal affect existing housing, or
create a demand for additional housing? YEN Y,BE `iV,O�
.0
Explanation:
(13) Transportation/Circulation. Will the proposal result in:
(a) Generation of additional vehicular movement? X
YES N YBE NO
(b) Effects on existing parking facilities, or demand
for new parking?
YES MAYBE NO
(c) Impact upon existing transportation systems? X
YE3 TAW MT
(d) Alterations to present patterns of circulation or �[
movement of people and/or goods? /`
YES WRY t—
(e) Alterations to waterborne, rail or air traffic? ?�
TES"- MAYBE NO
(f) Increase in traffic hazards to motor vehicles,
bicyclists or pedestrians?
YES MAYBE N
Explanation:
(14) Public Services. Will the proposal have an effect upon, or
result in a need for new or altered governmental services
in any of the following areas :
(a) Fire protection?
YES MAYBE N
(b) Police protection?
YES MAYBE
(c) Schools?
YES MAYBE Ik
(d) Parks or other recreational facilities?
YES MAYBE NO
(e) Maintenance of public facilities, including roads?
YES MAYBE NO
(f) Other governmental services?
YES MMAYBE N
Explanation:
(15) Energy. Will the proposal result in:
(a) Use of substantial amounts of. fuel or energy? X
YES MAYBE KO—
(b) Demand upon existing sources of energy, or require
the development of new sources of energy?
YES MAYBE
Explanation:,
(16) Utilities. Will the proposal result in a need for new
systems, or alterations to the following utilities:
(a) Power or natural gas? x
YET- NI F�
(b) Communications systems?
YET- MAYBE I-
(c) Water? X
YES MAYBE N0
-6-
(d) Sewer or septic tanks?
• YES MAYBE NO
(e) Storm water drainage?
YFS RUBY A-
M Solid waste and disposal? �C
YES MAYBE NO
Explanation:
(17) Human Health. Will the proposal result in the creation of
any health hazard or potential health hazard (excluding
mental health)? YU - MAYBE NO
Explanation:
(18) Aesthetics. Will the proposal result in the obstruction of
any scenic vista or view open to the public, or will the
proposal result in the. creation of an aesthetically offensive
site open to public view? K
YES MAYBE N-
Explanation:
(19) Recreation. Will the proposal result in an impact upon the
quality or quantity of existing recreational opportunities? if
YET- MAYBE N-
Explanation:
(20) Archeological/Historical . Will the proposal result in an
alteration of a significant archeological or historical
site, structure, object or building?
YET- MAYBE 0-
Explanation:
III. SIGNATURE
1,, the undersigned, state that to the best of my knowledge the above information
is true and complete. It is understood that the lead agency may withdraw any decla-
ration of non-significance that it might issue in reliance upon this checklist should'
there be any willful misrepresentation or willful lack of full disclosure on my part.
THE AUSTIN, COMPA,/�
Proponent: {? t� . e L /2', z
,e,
(signed)
W. /e0STErnrn Foil J/11/4L0LM L. YLE
(name printed)
City of Renton
Planning Department
5-76
r I S
GENERAL LOCATION: AND, OR ADDRESS:
PROPERTYLOCATED EAST OF FA -405, WEST OF LINCOLN AVENUE N. E. ,
IN THE 17U0 BLOCK OF N. E. 44TH STREET
LEGAL DESCRIPTION:
A DETAILED LEGAL DESCRIPTION IS AVAILABLE ON FILE IN THE
RENTON PLANNING DEPARTMENT.
I S POSTED TO NOTIFY PROPERTY OWNERS OF
A , 00
TO BE HELD
IN CITY COUNCIL CHAMBERS, MUNICIPAL t='UILDING
ON , APR I L 10, 1979 : EGINNING AT 9:00 km.
CONCERNING ITEM g
', EZONE
L.' SPECIAL PERMIT 0 FI O,AS M21-I9IUHE US®IN,CO.
TILE NO.
• SITE APPR • VAL
• WAVER
• SHORELINE MANAGEMENT
PER1T
FOR FURTHER INFORMATION CALL 235 2550
THIS NOTICE NOT TO BE RE V i WITHOUT PROPER AUTHORIZATION
OF I
A.
THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON.WASH.08056
NIL
n CHARLES J. DELAURENTI D MAYOR ® PLANNING DEPARTMENT
• 16 0 235- 2550
'ED 8EPTow
March 28 , 1979
The Austin Company
800 S .W. 16th Street
Renton , Washington 98055
RE: NOTICE OF APPLICATION ACCEPTANCE
AND PUBLIC HEARING DATE FOR APPLICATION FOR SPECIAL
PERMIT TO FILL AND GRADE IN B-1 ZONE; File SP-321-79;
property located east of FAI-405, west of Lincoln Ave. NE,
in the 1700 block of N.E. 44th Street.
Dear Sirs :
The Renton Planning Department formally accepted the above
mentioned application on March 14, 1979 . A public
hearing before the City of Renton Hearing Examiner has been
set for April 10, 1979 at 9:00 a.m. .
Representatives of the applicant are asked to be present .
All interested persons are invited to attend the hearing .
If you have any further questions , please call the Renton
Planning Department , 235-2550.
Very truly yours ,
Gordon Y . Ericksen
Planning ector 2
11
B y : C uitGti'
David R. Clemens
Associate Planner
cc: Foster Radford
10423 Main St.
Bellevue, WA 98004
rlak
NOTICE OF PUBLIC HEARING
RENTON LAND USE HEARING EXAMINER
RENTON, WASHINGTON
A. PUBLIC HEARING WILL BE HELD BY THE RENTON LANDUSE HEARING EXAMINER.
AT HIS REGULAR MEETING IN THE COUNCIL CHAMBERS, CITY HALL, RENTON ,
WASHINGTON, ON APRIL 10 , 19 79 , AT 9:00 A.M. TO CONSIDER
THE FOLLOWING PETITIONS:
1. BEL TERRA DEVELOPMENT- CORP. (BRENTWOOD PARK ADDITION) ,
APPLICATIONS FOR EXCEPTIONS TO SUBDIVISION ORDINANCE
REGARDING PIPESTEM LOTS, CUL-DE-SAC LENGTH AND DELETION
OF TURNAROUND, AND OFF-SITE IMPROVEMENTS, Files
E-317-79, E-318-79, and E-319-79; property located in
the vicinity of N.E. 11th and Pierce Ave. N.E. •
2. THE AUSTIN COMPANY, APPLICATION FOR SPECIAL PERMIT TO
FILL AND GRADE IN B-1 ZONE, File SP-321-79; property
located east of FAI-405, west of Lincoln Ave, N.E. ,
in the 1700 block of N.E. 44th Street.
3. C.H.G. INTERNATIONAL, INC. (EARLINGTON' WOODS) , APPLICATION
FOR PRELIMINARY MASTER PLAN PLANNED UNIT DEVELOPMENT
APPROVAL, File„MP-PUD-78; APPLICATION FOR EXCEPTION TO
ZONING ORDINANCE RE. PARKING, File E-244-78; AND
APPLICATION FOR EXCEPTION TO ZONING ORDINANCE RE. DENSITY,
File E-243-78; property located at Hardie Ave. S.W. between
Sunset Blvd. W. and Burlington Northern Railroad Right-of-Way.
Applications noted above on file in the Renton Planning .
Department.
•
•
ALL INTERESTEO .PERSONS TO SAID PETITIONS ARE INVITED TO BE PRESENT AT
THE PUBLIC HEARING ON April 10. 1979 AT 9:00 A. M. TO
EXPRESS THEIR OPINIONS.
GORDON Y. ERICKSEN
PUBLISHED March 30, 1979 RENTON PLANNING DIRECTOR
CERTIFICATION
, THAT
mcnN
OF THE ABOVEVDOCUMENT WERE P STED BYHBY MEEIIN THREEFY CONSPICUOUSEPLACESS
ON THE PROPERTY DESCRIE��' ' ,ABVE AS PRESCRIBED BY LAW.
ATTE-ST: Subscribed :and, warn`
to before me, a Notary publ ,i c•, '
on the 28th day of '.
19 jg �'1' ,`` . � .t SIGNED 7„, .....a.67711.-4-....10...tnn
Al6 - 41\-
PLANNING DEPARTMENT
PRELIMINARY REPORT TO HEARING EXAMINER
PUBLIC HEARING: AUSTIN COMPANY ( FOR J . MALCOLM LYLE)
APRIL 10, 1979
PAGE THREE
and noise levels in the area . However, through proper- develop-
ment controls and procedures , these impacts can be mitigated .
2 . Population/Employment: The fill and grade permit will have no
direct impact on employment. However, future commercial use
of the filled property will have to be addressed upon specific
development .
3. Schools : Not applicable. .
4 . Social : Not applicable.
5 . Traffic : Assuming 25 cubic yards per truckload , 25 ,000 yards
would require 1 ,000 truckloads , or 2 ,000 total truck trips .
J . ENVIRONMENTAL ASSESSMENT/THRESHOLD DETERMINATION :
Pursuant to the City of Renton ' s Environmental Ordinance and the
State Environmental Policy Act of 1971 , as amended , RCW 43-21C, a
declaration of non-significance has been issued for the subject
proposal . This negative declaration is further based on proper
development procedures per City ordinances and the provision of
suitable landscape areas to help reduce the resulting loss in
vegetation by site development.
K. AGENCIES/ DEPARTMENTS CONTACTED:
1 . City of Renton Building Division
2 . City of Renton Engineering Division
3 . City of Renton Traffic Engineering Division .
4 . City of Renton Utilities Division
5. City of Renton Fire Department
6 . City of Renton Police Department
L . PLANNING DEPARTMENT ANALYSIS :
1 . The subject site is presently zoned B-1 , Business Use; which
will permit future commercial development on the site . The
applicant ' s general proposal- for a motel would be consistent
with the comprehensive planning and zoning for' the area .
2 . No specific development plan for the subject property has been
submitted at this time . However, the applicant ' s proposed
future development will be subject to City of Renton require-
ments including the Hearing Examiner ' s site plan approval per
Section 4-2303 . 2C of the Mining , Excavation , and Grading
Ordinance.
3. The proposed ±25 ,000 cubic yards of fill will be placed on the
site to establish an elevation of 36 feet. The existing eleva-
tions range from a low point of ±28 feet in the south central
portion to a high point of ±50 feet near the southeast corner.
4. The Engineering Division of the Public Works Department notes
that the temporary sedimentation pond is required to have a
150 cubic feet per acre capacity with the bottom being 1" below
the flow line of the outfall . Straw bales should be placed
against the outfall pipes to reduce downstream siltation .
5 . The Fire Department advises that for any future development ,
the required access and hydrants or any other fire protection
facilities will have to be installed prior to and during con-
struction . These facilities will be required to meet fire
flow and uniform fire code requirements for occupancy type.
6 . The Police Department indicates that the contractor will have
to keep the adjacent roadways clear and clean of debris , dirt ,
and rocks .
L. 30
,. _ ,
. CXISTCD 0
• Ex/37.PJ'C 110 /NV3957 r//4ZOS
f ) _211t1/4
' ...'.4* ‘,,,.::, --- WVNYNI
•
, ii N.
. :-::::11,f,..:,, !-_,.::,,,,,,:,,,,,,:f-:,1.-;' :.,..;:0;1V..' ;,..-- _kii-c,-._ - $ ‘- - -. .-N, ,,t,....,,,,:". _ \ ..,,,,
. ,i,‘ \,\.\-, ,-. .....,
-...„...
.., - -... -,, LitiST
( (_‘ - - --- i 1 . . ..\ :
-"' /.:"!.:= : ,-- ••. r, " . . ' ' '.. - , t%it' ,,.;",'" - 7- -.---'. ----,.- ------:'/ ,,,., c- ,
4:11 •,..' ., .
hiliii .. - - I ..
. . 1.--.:, , ..;:11,-,::i,,.. ,, Op: \-. N.
- / . .:. , , ,,
.�``` I . , . . . . - .0, .
_
•
r:etCOir ,4 h�IA s73c yv {I DrTwc.r ,' ���®��O
-,.
M0N/case -ti.3C,ei
Cx/3T 24 CMO. fLfV 3L3T _ _
/NV 33a -
M I
I\ - \\, \
��=I \I, , J[���J ��•��• sT
o
j IUI (y �� 14z 4i '7L '
- Y"1
6,049/
/ ./ • 1 . I : :' i`l1
/" /'c
i / \'t®� . ••n . J
, 3� e/ ...(.. //' szf, iii
1 III
///// � q 1. { te2 .f.7 4 xb lx5 M
. 1 . :// / / t' '
i (/ Fll—1 /1 7
.. 1' ..L �'e 5 rGv
�� 7 �. _,. . -r x
/ 1 _
/ t}j ( W
/./ I I ! i 4 12 ! 4
I
IIII I - 1, 'i_ - I.
VA , '/:°'M,,.. i: 1 ti 5 ryr 4 1 5 '
It Idi
\ :.. ► 7 = T B 4
/' //, - , \
/ q 1 I ° 9 ----"---- — --
� � .____ I ,_ 1} c\ �� ' r
;.,/,.: -----7, , :00: _-_,. .7 1 1 _ : _,______.: it„.,,,set IA,__ _ ___ . I.,
4 ill ,.p- P' } .Oz a II I + 1 7 ... — 5 \ C ��®��i
as ! • T —J
J 4 ex .i.: •.; e. i'°° WM
__ l_ .0 II 2 9 Q ` i 8 1 4
i / / SO
A, A. E
• z � Ir1 I >93 I___ 94. vv o r 1 t .. 1 as,.sr 1 r 1-- -_ -7
•,1. )! /r ' r.I,h1 1.1.1.11,1.1 ZI1,.1.L1.I.I.I.U. we{+.iN \ A �__.�. ....-...._.. .w.._... ... _.. .,..._...__•_•__•_ __..
r
I THE AUSTIN COMPANY ( FOR J . MALCOLM LYLE) •
i
s SP-321-79
I
1
L.—=.=---------------t=--- .......,
APPLICANT THE AUSTIN COMPANY (FOR J. MAI COI M TOTAL AREA ±4 acres
LYLE)
PRINCIPAL ACCESS Via N . E . 44th Street
EXISTING ZONING 1 uSinaec flea --
EXISTING USE Undeveloped
PROPOSED USE Motel Complex
COMPREHENSIVE LAND USE PLAN Commercial
COMMENTS
r
r
ROUTING SCHEDULE FOR APPLICATION
TO: ® Finance Department
8 Fire Department
Library Department
OPark Department
® Police Department
® Public Works Department
' ,Q Building Div .
t` 0 Epgineering Div. (Please verify legal description )
Traffic Engineering Div .
g"
Utilities Engineering Div .
FROM: Planning Department , (signed by responsible official or
his d signee)
/ a/1) E Nl/
riti DATE : 4Ø9
PLd / IIY
SE REVIEW THIS APPLICATION FOR:
APPLICANT.: 4 if/* if:09 -
LOCATION : /Vig' e ,in
APPLICATION(S) : AY 44 � �& : 1''r—' '®10� 2,
�
IN ORDER TO BE .INCLUDED IN THE REPORT TO THE HEARING EX
RETURN ANY COMMENTS TO THE PLANNING DEPARTMENT BY :
REVIEW BY OTHER CITY DEPARTMENTS :
Department : /Z1-i=/=iC E /Ur;1/V E/ ' / n/6
(1 Approved LJ Not Approved
Comments or conditions :
(i'':i:ZZ''7 , 3A/77
Signature of Directo
r or Authorizeld Representative Date
, r
ROUTING SCHEDULE FOR APPLICATION
,
TO: Q Finance Department
8 Fire Department
Library Department
® Park Department
® olice Department
0 Public Works Department
® 26 lding Div.
0 Engineering Div . (Please verify legal description)
® Traffic Engineering Div.
0 Utilities Engineering Div.
FROM: Planning Department , (signed by responsible. official o.r..,
his d signee)
,. ok/I� �C.� eibtigt4 DATE : iO/
PLE SE REVIEW THIS APPLICATI
ON FOR :
APPLICANT :` i �// / 6/4
LOCATION : ,eL. z:-_,,,i0,
P P L I C AT I O N S : ¢4i �' ( c/d : ��'~ 1,g/- 21
IN ORDER TO BE INCLUDED IN THE REPORT TO THE HEARING EX
RETURN ANY COMMENTS TO THE PLANNING DEPARTMENT BY : ,,,.
REVIEW BY OTHER CITY DEPARTMENTS : ' .,..
Department :
Approved ED Net Approv _. .
Comments or conditions :
•
,k -Od / atiwe Date
Si gnature yof Director or ' A�thori zed Represen_�
r ROUTING SCHEDULE FOR APPLICATION
TO: O Finance Department
8 Fire Department
Library Department
OPark Department
0 Police Department
Public ks Department J
Building Div.
0 Engineering Div. (Please verify legal description )
8 Traffic Engineering Div .
Utilities Engineering Div.
FROM: Planning Department , (signed by responsible official or
his d si U604gneO k P d & f / DATE :. /i/ 9
Y� -
q ti ..1
PLE SEREVIEW, THIS APPLICATION FOR :
APPLICANT: 4/ *
LOCATION : . - J.( e 15-4'094,
APPLICATION(SH): JO A7,41/7/ 6/let? : 1�" "e "
IN ORDER TO BE INCLUDED IN THE REPORT TO THE HEARING EX
RETURN ANY COMMENTS TO THE PLANNING DEPARTMENT BY : r
REVIEW BY OTHER CITY DEPARTMENTS :
Department : CliLim C_
Ea Approved Not Approved
omm nts or conditions :
•
A F/
,- (, ,& f/:,,---- /1 —77
Signature of Director or Auth rized Representative Date
ROUTING SCHEDULE FOR APPLICATION
TO : O ,Finance Department
Fire Department
a Library Department
d o Park Department
OPolice Department
� Public Works Department
} ® Building Div .
08 Engineering Div . (Please verify legal description)
O Traffic Engineering Div .
Util ities Engineering Div .
FROM: Planning Department , (signed by responsible official or
his d signee ) L 001,W4 DATE : ?//0/A1
�T
PLE SE REVIEW THIS APPLICATION FOR :
APPLICANT : e/&' vt:
/
LOCATION : e
2--400
APPLICATION( S) : AZ4� ' 6A7OO • � ,t/f°"° ;7,
IN ORDER TO BE. INCLUDED IN THE REPORT TO THE HEARING EX N
RETURN ANY COMMENTS TO THE PLANNING DEPARTMENT BY :
REVIEW BY OTHER CITY DEPARTMENTS :
Department : Tj,!_�Y
[="Approved c1 Not Approved frrus =i uia5",cx4,
Comments or conditions : f02 /,vy
4-0:c<;"5 S /t vi 7 t-/i'G //Wi-'/N-i S d/` /ht'y 0'77/e C r'i/e : c j2o/ii /.%)- /e- L
rSG I -'S,//Zec5X P/'i o/� ? /1? Q ,C7!/,r?/.✓G' 13/.e/cam//✓G' Zyc
L.2! Gl /AZ-Y,/L-t UGC a/4/7'iVc-=>'
Signature of Director or Authori e`dRepresentative Date
REVIEW BY OTHER CITY DEPARTMENTS :
Department: �j 'i� �� DLCP T
Approved I1 Not Approved
Comments or conditions :
Sq.6jc-c O tr)�}"[f (.a f 1/l� f'(W� ?2t().0,/0--tiUY i s p7c-;ervil_y
Au)1ALr►h:G- APnIW.< I CU O Owl
..31G 7i
Signature of Director or Auth rized Representative Da .e
ROUTING FOR REVIEW OF ENVIRONMENTAL CHECKLIST FORMS
TO: 0 Finance Department
III Fire Department
Library Department
Park Department
,Police Department
4 Public Works Department
40 uilding Div .
40 Engineering Div.
Q Traffic Engineering Div .
® Utilities Engineering Div .
FROM: Planning Department , (signed by responsible official or his
designee )
0/frips € Ui ' 9/10#
.� �f ; A r" she/-- 79
SUBJECT : ' Review of ECF- ��� Application No . : r ,-
Action Name : "a'#O" e®/ade.
ig 1.''' g ,,,t'-108
Please review the attached . Review requested by (date) : A7 W
Note : Responses to be written in ink .
REVIEW BY OTHER CITY DEPARTMENTS :
Department :
1 ! SIGNIFICANT ----z4i),X1---.---17-10'N.L.711FICANT
Comments :
�---2 / /?7
Signature of Director or Authorized Representatif Date
ROUTING SCHEDULE FOR APPLICATION
TO : ® Finance Department
8 Fire Department
Library Department
® ark Department
Police Department
0 Public Works Department
0 Building Div.
OEngineering Div. (Please verify legal description )
Traffic Engineering Div .
Utilities Engineering Div .
FROM: Planning Department , (signed by responsible official or
, his d signee )
t.
�" et,t DATE : /O9::; ..
PLE SE REVIEW THIS APPLICATION FOR :
APPLICANT : � ��. 4,, f��F, * „,,,,,,
Aze,
LOCATION :
`1,1 e' .4,
APPLICATIONS) : 4/ �.�'�� Mich : 07- 4eif..- .71 .
IN ORDER TO BE INCLUDED IN THE REPORT TO THE HEARING EX N
RETURN ANY COMMENTS TO THE PLANNING DEPARTMENT BY :
REVIEW BY OTHER CITY DEPARTMENTS :
Department : POLICE DEPARTMENT
(IJ Approved tZ Not Approved
Comments or conditions :
Reviewing the Proposed Fill and Grading Project at NE 44th and 1-405
we see no problem to the police department, except that the Contractor
will have to keep the adjacent roadways clear and clean of debris,
dirt, rocks, etc.
This will be brought to the attention of the contractor at the pre-
construction conference.
Signature of Director or Authorized Representative Date
ROUTING' FOR REVIEW OF ENVIRONMENTAL CHECKLIST FORMS
TO: ® Finance Department
Fire Department
Library Department
Park Department
0 Police Department
® Public W6Cks Department
Q Building Div .
AO Engineering Div.
® Traffic Engineering Div .
Utilities Engineering Div.
FROM: Planning Department, (signed by responsible official or his
designee )
map 6/01" , ,,, I
SUBJECT : Review of ECF- 4094 ; Application No . : ' ;:v ,e,/- 9
Action Name : /! a'#O' e' '&
4' ..,t'-*/,
-9,6
Please revie
w w the attached . Review requested by (date ) : W
Note : Responses to be written in ink . ,
REVIEW BY OTHER CITY DEPARTMENTS :
Department : ( -j (--'M ,
( ! SIGNIFICANT )NON SIGNIFICANT
Comments :
•
•� %'-,-, e - Date
Signature of Director or Authorized Representative
ROUTING FOR REVIEW OF ENVIRONMENTAL CHECKLIST FORMS
TO: O Finance Department
111 Fire Department
Library Department
Park Department
Police Department
® Public Works Department
8 Building Div .
Engineering Div .
Qi Traffic Engineering Div .
® Utilities Engineering Div .
FROM: Planning Department , (signed by responsible official or his
designee ) 9/if/IN
Review0,4pe g 61, ,,. ,v
of ECF- 4,1-191 ; Application No . : 0' "2/,-- 7
,91
SUBJECT : Action Name : / 7'evosi /'O e ' 1
ifkA ./.% a et-
Please revie
w the attached . Review requested by (date) : 0
Note : Responses to be written in ink . .
REVIEW BY OTHER CITY DEPARTMENTS :
Department : li�c� ieI . L [l�' l v-, e(- �L-1/
I ! SIGNIFICANT - aNON SIGNIFICANT
Comments :
•
•
(-L'rZ) 7 . ----• 2 ". ''- -1-•‘__ ' j4C/2
Date
Signature of Director or Authorized Representative
r 3-
ROUTING FOR REVIEW OF ENVIRONMENTAL CHECKLIST FORMS
TO: ® Finance Department
4, Fire Department
Library Department
Department
43 Police Department
0 Public Works Department
8 Building Div.
Engineering Div.
® Traffic Engineering Div .
® Utilities Engineering Div .
FROM: Planning Department, (signed by responsible official or his
designee)
altpt/ € 641, , v/0/9/
SUBJECT : Review of ECF- ove- 1 ; Application No . : a;)- ,e/— 1
Action Name : Welf,vel iihni .
/
i :, ,
.. ,,, , , ,
Please review the attached. Review requested by (date) : "
Note : Responses to be written in ink .
REVIEW BY OTHER CITY DEPARTMENTS :
Department :
l ~ SIGNIFICANT I INON SIGNIFICANT
Comments :
r
Signature of Director or Authorized Representative
Date
ROUTING FOR REVIEW OF ENVIRONMENTAL CHECKLIST FORMS
TO: ® Fi.nance Department
77, e'- Fire Department
di Library Department
40 Park Department
ID Police Department
Public Works Department
Building Div.
Engineering Div .
i ® raffic Engineering Div .
C' (5 Utilities Engineering Div .
FROM: Planning Departments (signed by responsible official or his
designee) o
041/$
, -,,a/ v//e9i
SUBJECT : Review of ECF- .f‘�940 ; Application No . : 02X// 9
Action Name : V/a'#57" argeie-
i, ".944 , s tip
, i
, Please review the attached . Review requested by (date) :
Note : Responses to be written in ink .
REVIEW BY OTHER CITY DEPARTMENTS :
De)artment : y//cfi—
I '! SIGNIFICANT I l NON SIGNIFICANT, -7 A1c"t57" /; %Zc'
Comments : ie
c u i z- �`�2 S fiv. !7 free :,.r/0e Cax4 Ti c 7i�,L:,
/266-wi?E/-� /2CC�`5S /��,0 /-/ //Yi7/?J7 '7 S oc i°I%v% ei,if' i!2 Oee ;iC
/'/1 e/2_,/ z, S (SY NC- /_' PvS'--7-i,744 .-2 I°,ef d z. v /4''/.9 1,4-/2/,<. - 13c1/G /4 '
('),US��-Cidiv. /"lus /7 / er v/Gd/c-'rl j— �1d/06 ,e_G flu,/rEMC, r.- , d/L
0 ccv./ -mac ye`
g / `� 7 r
Signature of irector or Authori d Kepresentative . Date
REVIEW BY OTHER CITY DEPARTMENTS : _-
Department :
1 ' SIGNIFICANT ' i NON SIGNIFICANT
Comments :
Signature of Director or Authorized Representative Date
PROPOSED/FINAL DECLARATION OF SIGNIFICANCE/NoN-SIGNIFICANCE
Application No . SP-321-79 ® PROPOSED Declaration
Environmental Checklist No . ECF-439-79 0 FINAL Declaration
Description of proposal The applicant seeks approval of a special permit
for fill and grade of approximately ±25 ,000 cubic .yards on a 4-acre site
for future development of a motel complex.
Proponent AUSTIN COMPANY ( FOR J . MALCOLM LYLE)
On the north side of N.E. 44th St. east of FAI-405 and
Location of Proposal west of Lincoln Avenue N.E.
Lead Agency CITY OF RENTON PLANNING DEPARTMENT
This proposal has been determined to 0 have ® not have a
significant adverse impact upon the environment . An EIS 0 is
In is not required under RCW 43 . 21C . 030 (2 ) (c ) . This decision was
ma-de after review by the lead agency of a completed environmental
checklist and other information on file with the lead agency .
non
Reasons for declaration of environmental /significance :
This declaration is based on proper development procedures per City
ordinances and the provision of suitable landscape areas to help
reduce the resulting loss in vegetation by site development. •
Measures , if any , that could be taken to prevent or mitigate the
environmental impacts to such an extent that the lead agency would
withdraw its declaration of significance and issue a (proposed/final )
declaration of non- significance :
Responsible Offi ial Gnrdn❑ Y _ Ericksen.
Title P1a tsns ects, f T' Date April 3, 1979
Signature �rir ./ �. ,,w_.