HomeMy WebLinkAboutC23006099 ConditionsDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit C23006099
Engineering
1 Structural calculations for the foundation design shall be submit to the development engineering project manager
prior to installation.
2 No ground disturbing activity shall occur, with exception of installing erosion control measures such as silt fence,
until a pre-construction meeting is held. Until the pre-construction meeting is held, applicant may perform above
grade work only such as, but not limited to, jobsite mobilization, installation of erosion control measures, and
jobsite mobilization.
3 Applicant shall submit the proposed street light pole and luminaire to the development engineering project
manager for review and approval prior to installation.
Page 1 of 1