Loading...
HomeMy WebLinkAboutSolera - Earth Solutions Field Report - STORMTECH CHAMBER SYSTEMEarth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 5719.05 Page 1 of 2 Report ID 5719.05 E 09162022B Date Fri 9/16/2022 Weather 64°F Cloudy Arrival/Departure Time(s) 11:15AM; 12:00PM Travel Time (hr) 0.25 Project Name Solera – Building B Location 2950 NE 11th St, Renton ESNW Rep. & Phone Christopher Halter, (206)-602-9915 Client Info/Contact Heartland Construction, LLC | Craig Vierling, Benham Hansen General Contractor Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. As requested by client, ESNW rep was onsite to observe work on StormTech chamber for building B. StormTech Chamber for Build B: While onsite ESNW rep observed the contractor continuing to work on the StormTech chamber for building B. Contractor expressed to rep that they are laying filter fabric over the subgrade and then placing approximately 9-inches of 11 4 clean crushed rock above the filter fabric. Contractor expressed that they would continue to work on it through the day. See area outlined in red below as the portion being worked on. ESNW rep will return to observe earthwork activities, at the request of the client. Report ID 5719.05 E 09162022B Page 2 of 2 Earth Solutions NW, LLC Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 5719.05 Page 1 of 2 Report ID 5719.05 E 09192022B Date Mon 9/19/2022 Weather 73°F Clear Arrival/Departure Time(s) 11:15AM; 12:00PM Travel Time (hr) 0.50 Project Name Solera – Building B Location 2950 NE 11th St, Renton ESNW Rep. & Phone Christopher Halter, (206)-602-9915 Client Info/Contact Heartland Construction, LLC | Craig Vierling, Benham Hansen General Contractor Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. As requested by client, ESNW rep was onsite to observe work on StormTech chamber for building B. StormTech Chamber for Build B: While onsite ESNW rep observed the contractor continuing to work on the StormTech chamber for building B. Contractor was observed beginning to place StormTech chamber segments on top of woven geotextile fabric. Contractor expressed they would then begin to cover the chamber segments in 1.25 clean crushed rock. See picture below of StormTech chamber being worked on. See area outlined in red below as the portion being worked on. ESNW rep will return to observe earthwork activities, at the request of the client. Report ID 5719.05 E 09192022B Page 2 of 2 Earth Solutions NW, LLC Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 5719.05 Page 1 of 1 Report ID 5719.05 E 09232022B Date Fri 9/23/2022 Weather 66°F Cloudy Arrival/Departure Time(s) 10:15AM; 11:00AM Travel Time (hr) 0.50 Project Name Solera – Building B Location 2950 NE 11th St, Renton ESNW Rep. & Phone Christopher Halter, (206)-602-9915 Client Info/Contact Heartland Construction, LLC | Craig Vierling, Benham Hansen General Contractor Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. As requested by client, ESNW rep was onsite to observe work on StormTech chamber for building B. StormTech Chamber for Build B: While onsite ESNW rep observed the contractor continuing to work on the StormTech chamber for building B. Contractor was observed placing filter fabric on subgrade and then placing 9 inches of 11 4 inch clean crushed rock on top of the filter fabric. See picture below of progress on Stormtech chamber. ESNW rep will return to observe earthwork activities, at the request of the client. Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 5719.05 Page 1 of 1 Report ID 5719.05 E 10032022B Date Mon 10/3/2022 Weather 70°F Clear Arrival/Departure Time(s) 11:00AM; 12:00PM Travel Time (hr)0.50 Project Name Solera – Building B Location 2950 NE 11th St, Renton ESNW Rep. & Phone Christopher Halter, (206)-602-9915 Client Info/Contact Heartland Construction, LLC | Craig Vierling, Benham Hansen General Contractor Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. As requested by client, ESNW rep was onsite to observe work on StormTech chamber for building B. StormTech Chamber for Building B: While onsite ESNW rep observed the contractor continuing to work on the StormTech chamber for building B. Contractor was observed placing the end caps to the StormTech chambers and preparing to connect stormwater piping to the chamber system. See picture below of progress on Stormtech chamber. ESNW rep will return to observe earthwork activities, at the request of the client.