PROVIDE 8' WIDE ACCESSILE AISLE
OR 11' WIDE VAN STALL. PROVIDE
60" h ACCESSIBLE SIGN
PROVIDE ENGINEERED MODULAR HOLD DOWNS.
as builds and cctv video indicate a sewer stub in the general area of the parcel but there
is not a utility billing account or side sewer on record. applicant shall verify, in the
presence of a public works inspector, that the existing building is connected to the city
sewer.
if the building is not connected to the sewer than the existing on-site septic system shall
be decommissioned in accordance with King County Department of Health and City of
Renton standard 4-6-040.I.6. a new sewer stub shall be installed in accordance with COR
std. plan 406.1 with a building sewer installed in accordance with COR std. plan 406.2. a
permit will be required for installation of new sewer stub and side sewer.
utility review comments pertain to the office building only. separate
permits are required for the lumber warehouse and the site paving.
install a DCVA per
COR std. plan 340.8.
DCVA shall be
installed on private
property as close as
possible to the
existing meter.
a separate plumbing
permit is required,
contact the building
department for
assistance in
acquiring permit.
Per LUA22-000316, a
Critical Areas
Exemption for the
removal of pavement
and restoration of
the wetland buffer
shall be submitted by
December 26, 2022.
EF1
EF1
PLUMBING AND ELECTRICAL
UNDER SEPARATE PERMIT
AND PER FIELD INSPECTORS
REVIEWED
BUILDING DIVISION
By: Rick Lee
Date: 09/09/2022
THIS SET OF REVIEWED PLANS INCLUDE BOTH THE SUBMITTED
DESIGN AND ADDITIONAL CODE REQUIREMENTS MARKED IN RED.
PLANS MUST BE MADE AVAILALE ON THE JOB AT ALL TIMES
DURING CONSTRUCTION. THIS BUILDING / PROJECT IS NOT TO BE
OCCUPIED UNTIL AFTER FINAL INSPECTION BY THE RENTON
BUILDING DIVISION